2024/25
ROADS &
NEIGHBOURHOOD
ITEM 7 - APPENDIX 2

Page 2

Contents
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 5
4. Resources .................................................................................................................................................................................................... 12
Appendix 1: Action Plan .......................................................................................................................................................................................... 13

Page 3

1. Introduction
Roads & Neighbourhood comprises a wide range of services covering Roads and Transportation and Environment and Neighbourhood,
including Greenspace and Waste Management, Capital Investment Team, Consultancy Services, Compliance Team and Fleet Management.
It is one of seven strategic areas responsible for delivering the Council’s Strategic Plan. Key actions to help achieve this are set out in this
Delivery Plan, together with actions to address any performance issues and service priorities identified in the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Infrastructure, Regeneration and Economic
Development Committee twice yearly, at mid-year and year-end.
2. Performance Review
The Roads & Neighbourhood management team completed a detailed review of 2023/24 performance, focusing on the following:
• 2023/24 Delivery Plan year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints; and
• Continuous Improvement
This review highlighted our key achievements in 2023/24 as well as the challenges to be addressed in 2024/25. These are summarised below.
Key Achievements in 2023/24 
Listed below are some of the major achievements. All services achieved many other key outcomes for the Council and its residents throughout
the year which are not recorded here but are as important.
Strategic Team
• Engaged with Glasgow City Council to develop an innovative Net Zero Cooperation Agreement to share skills, resources and infrastructure to
deliver the Climate Change Strategy and Action Plan.

Page 4

• Further implemented the collaborative approach between West Dunbartonshire Council and the wider City Region to increase resilience,
share best practice and identify opportunities in the delivery of the Electric Vehicle Strategy.
• Following the removal of the shared service agreement. A management team restructure has been implemented to support service delivery
and efficiencies.
• Engaged with in excess of 240 volunteers to carry out environmental improvement work.
• Created a community woodlands in Clydebank and Bonhill in conjunction with the local school and community Councils. This included
planting of approx. 2000 trees.
• Completed review of all asbestos management plans for the Education estate
• Gained Planning permission for Exxon City Deal with final business case approved by Council which will create a major industrial and
commercial development in West Dunbartonshire.
• Developed an active travel strategy and carried out consultation with stakeholders.
• Developed a Waste Strategy and Action Plan for the Council gaining Committee approval
• Submitted final application to the Scottish Government for the introduction of Decriminalised Parking Enforcement across West
Dunbartonshire.
• Following engagement and design works, formally notified the Gruggies Burn Flood Alleviation Project by the Scottish Government 31st
March 2024 deadline to support future funding requests for the delivery of the project
Key Challenges from 2023/24
Along with the achievements noted above, there were significant challenges in 2023/24.
Cross Service
• Demographic of Workforce. R&N has an aging demographic within the workforce and this is also the case nationally. We will continue to
carry out workforce analysis and development and will identify opportunities for apprentices and graduates. We are continuing to identify
skills gaps to provide upskilling appropriate training and succession planning to allow the Council to plan for the future.
• Staff. The national skills shortage of qualified and experienced officers in Roads and Neighbourhood Services resulting in reduced staff
complements across many services and increased demands on existing staff. Due to high demand outstripping the labour supply, labour
rates continue to increase together with challenges recruiting and retaining skilled staff. This means that we will have to optimise staff
retention and improve recruitment practices to ensure job roles are in line with demand.
• Climate Change. Due to more adverse weather condition and extreme weather events due to climate change Roads and Neighbourhood
require to make changes to operational ongoing service delivery and response to events. In particular flood risk management plans.
• Capital Projects. Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw material costs,
impacted on supply chains, and third parties and our ability to carry out works within budget and on time

Page 5

• Construction inflation remains a concern with labour and material costs significantly increasing over the last year.
• Resilience / Capacity Challenges. The ongoing rationalisation of resources and development of service efficiencies and savings has
resulted in many service changes. There are a range of challenges linked to a continuing and increased reduction to front line services, both
employee reductions and service delivery rationalisation. This has resulted in a number of initiatives taking longer than anticipated, increased
demand on staff, reduction in service satisfaction levels and increased complaints. This will require strict prioritisation going forward and
delivering services in a different way including service delivery redesign where required.
Roads & Transport
• Flood risk management including prioritisation and progress of initiatives continues to be a challenge. Further promotion of the opportunity for
residents to apply for property protection measures will be undertaken.
• Decriminalised Parking Enforcement (DPE) and pavement parking, strategy and implementation is very dependent on the introduction of
parking enforcement and government guidance.
Greenspace & Waste Management
• Ash Die Back, the scope and scale of the work required is very difficult to predict and may put an additional strain on resources.
• Increase in household waste and associated costs continues as there are more people working from home resulting in household residual
waste increases. The impact is additional Biodegradable Municipal Waste being sent to landfill, this is largely out with the influence of the
Council as we cannot directly control the proportion of biodegradable waste contained in householders’ landfill waste bins or deposited at the
household waste recycling centres. The Waste Strategy sets out a communications proposal to support and educate residents to improve
recycling performance and reduce residual waste.
• Due to suppliers leaving the market we expect there will be challenges in getting suppliers / contracts in place for waste treatment options.
3. Strategic Assessment
The Roads & Neighbourhood management team completed a strategic assessment to determine the major influences on service delivery and
priorities in 2024/25 and identified a range of key factors recognised as significant. These are summarised below.

Page 6

Financial Challenges 
The entire public sector is continuing to face significant financial challenges due to a range of factors including inflationary cost increases, pay
awards not being fully funded by the Scottish Government and insufficient overall funding to support the delivery of front line and back office
services. The Council are currently faced with an estimated cumulative funding gap in 2025/26 of £9.8m rising to £40.4m by 2028/29.  We will
continue to monitor the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected
Members throughout 2024/25.
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that within Roads &
Neighbourhood available funding will be reduced over time and we will need to reconfigure how we work, what we do, where we work, and
potentially reduce the number of people employed. In this context, we will aim to continue to provide a sustainable, quality service to internal
clients and the public.
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. 
In R&N income budgets are more susceptible to fluctuations given the uncertainties surrounding demand.
Roads & Neighbourhood Action Plan
Roads & Neighbourhood Services Collaborative Working and Partnerships
The Council has progressed the development of a Net Zero Cooperation Agreement with Glasgow City Council and this will facilitate the joint
development and delivery of a number of climate change workstreams through the sharing of skills, knowledge and infrastructure for example
transition to electric fleet, the waste strategy and sustainable travel initiatives.
In addition, the Council will continue to work in partnership with the City Region to identify sharing opportunities such as joint procurement
including EV charging strategy. In 2024/25 an initial committee report will be presented highlighting strategy and delivery models for Council
consideration.
Roads & Transport
Transport (Scotland) Act 2019 – Pavement Parking

Page 7

The Transport (Scotland) Act, promoted by the Scottish Government, received Royal Assent in November 2019. It will have a very significant
impact on local authorities in relation to a number of areas in particular pavement parking. The prohibition of pavement parking came into force
on 13th December 2023. Initial Government Guidance has now been published for the implementation and possible exemption to the prohibition
of Pavement Parking. In 2024/25 the service will liaise with Transport Scotland to identify the required funding to undertake a review of the
Network and develop a pavement parking strategy for West Dunbartonshire for submission to Council.
Parking Enforcement  
Parking enforcement within West Dunbartonshire Council currently is under the responsibility of Police Scotland. The Scottish Government have
however identified the key role local authorities play in improving traffic safety and reducing congestion across their area and as such LA have
the power under the Roads and Transport Act to request that these powers are transferred to them. The Roads and Transportation team have
been tasked with implementing decriminalised parking enforcement across the West Dunbartonshire area. The application to have the powers
transferred has been submitted to the Scottish Government through Transport Scotland for consideration and approval and consultation has
been undertaken with all stakeholders. Following approval confirmation on an implementation date will be given and works will progress in
2024/25.
Electric Charging Points 
This continues to be a priority initiative with a collaborative approach to the phased delivery of public and fleet charging infrastructure in
partnership with the City Region. In 2024/25 we will finalise the strategy to engage with external suppliers to support and increase our Electric
Vehicle Charging Point infrastructure for both on and off street parking.  This will be presented to Elected Members for consideration, this will
include the Implementation Strategy and Expansion Plan and detail of the proposed procurement model to implement a phased delivery of public
and fleet charging infrastructure.
Gruggies Burn  
As part of West Dunbartonshire Councils action for Cycle 1 of the Flood Risk Management Plan Gruggies Burn Flood Scheme scored high on
the priority list. Due to the over commitment of the Scottish Government flooding budget the progression of all projects were paused. Following
recommencement challenging deadlines have been placed on the Council to complete project milestones.  The Roads and Transportation Team
have notified the scheme to all stakeholders and undertaken consultation.  Any objections or representations received will be considered through
the detailed design with a view for works to commence in 2025 once funding is agreed. 
Surface Water Management Plan 
The Clyde and Loch Lomond Flood Risk Management Plan highlights action which need to be undertaken by local Councils to address flooding
in the area. These actions are split into 6 years cycles to make outcomes easier to achieve and spread costs. As part of Cycle 1 of the Plan a
Surface Water Management Plan (SWMP) for Dumbarton and Vale of Leven was developed with the Flood Risk Management Plan for
Clydebank included in Cycle 3 (2028 to 2034). As a result of continued flooding issues in the Clydebank area the service secured approval from

Page 8

SEPA to escalate the SWMP for Clydebank into Cycle 2. This was completed in 23/24. Following the improvement study for Dumbarton and
Vale of Leven to modal the surface water, pluvial and sewer flooding to ensure suggested actions identified in the SWMP for Dumbarton and the
Vale were appropriate and provide high level estimates and designs for the implementation of any actions. This has highlighted what actions can
be undertaken in the area to address flooding and support the development of the SWMP for Clydebank. In addition work will progress in
Dumbarton & Vale of Leven in 24/25. 
Roads Service Provision - Adjustments 
Following the 2024/25 savings options, some service changes were agreed which include reduction in resources and changes to service
provision. These include, a review of school crossing patrollers, reducing locations as required to only those sites not serviced by pedestrian
crossing facilities. Non statutory roads support within education will change removing dedicated officer support but continuing to provide advice
and guidance as necessary to assist school with the creation of their School Travel Plans. Reduction of operatives within the roads service to
minimal levels required to continue to provide Winter Gritting Operations but will impact on capacity to respond to reactive defect repairs.  
Road Defect Repairs 
Following the 2024/25 saving options changes to the method used for defect repairs was agreed. Currently, cold applied material is used for
defect repairs which has an expected service life of 1 year on A and B class roads and up to 3 years on C class and residential roads before a
repeat repair is required. Under this proposal, planned defect repairs will be undertaken using hot asphalt as part of a wider planned structural
patching programme, which have an expected life of over three years no matter the road classification or traffic volumes. Future development of
this approach may require the purchase of a hotbox as a capital investment and this will be reviewed over 2024/25. Additional training of team in
classification and identifying defects that are suitable for a planned repair will be required as well alterations to defect classifications.
Satisfaction with Roads Services
Roads satisfaction levels have been low over a period of time. The satisfaction levels are measured from citizen responses to the WDC
Telephone Survey. In 2024/25 the Roads and Transportation team will undertake additional in depth survey and analysis to identify mitigation
measures to address residents’ concerns. An action plan will be developed from this information with relevant performance targets included. This
will include a communication proposal and engagement programme to ensure communities are more informed on the investment plan
maintenance and prioritisation programme.
Greenspace & Waste Management
Food Growing Strategy and Allotments
The Greenspace service currently manages two allotment sites in Dumbarton. There is a 10 year waiting list for allocation of an allotment. The
Community Empowerment Act places an obligation on Local Authorities to provide sufficient allotments for its residents. There is an allocation of
£400k in the Council’s capital plan to develop new allotment sites. In addition, we have been successful in securing 100K from the Scottish

Page 9

government vacant and derelict land fund to enhance this programme. Sites have been identified with low contamination at Dillichip Loan and
Dumbarton Common Following increase in funding allocated within the Council Budget the scale of the project has been increased and draft
project plans have been developed.  In 2024/25 we will progress the completion of both sites. The site at Dillichip loan will be completed in
summer 2024 and will provide an addition 50 allotment plots. Work is programmed to commence on the site at Dumbarton Common in autumn
2024 with an estimated completion date of spring 2025, this site will also provide an addition 50 allotment plots. We have written to residents on
the allotment waiting list to offer them the opportunity of a plot at Dillichip loan on completion.     
Ash Die Back
Ash dieback is a serious disease of ash trees caused by a fungus. The disease causes leaf loss and crown dieback in affected trees and can
lead to the death of the tree. Of the 10 million ash trees in Scotland 90% may die due to this disease. Infected trees need to be identified and
removed to prevent or minimise the spread of the disease. Work is underway to remove diseased trees and a full audit of affected areas will be
carried out. In 2024/25 an action plan will be developed identifying the extent of the issue and any associated cost pressures.  
Bio Diversity 
The new Scottish Biodiversity Strategy is being developed with the aim of halting biodiversity decline by 2030 and having nature restoration
underway by 2045. Giving full consideration to the strategy WDC will develop a new local Biodiversity Action Plan identifying local actions that
will contribute to the overall aims of the national strategy. Following consideration of the national strategy in 2023/24, we will further progress the
development of a local Biodiversity Action Plan in 2024/25.
Play Parks and Recreation Facilities 
We have developed plans to upgrade 8 play parks throughout West Dunbartonshire, investing 465K to improve accessibility and inclusivity. The
play parks in; Craigielea Road, Clydebank, Stuart Avenue Old Kilpatrick, Rosshead, Alexandria, Pappert Bonhill, Firthview Terrace, Highmains,
Kyle Terrace and Westcliff, Dumbarton. The contracts have been awarded, with play parks expected to be delivered during the summer of 2024.
We will also Build 4 new Multi Use Games Areas (MUGA) at Bonhill, Goldenhill Park, Milton Park and Brevel Crescent to provide additional
sports facilities for young people throughout West Dunbartonshire. Tenders have been issued. In 2024/25 we will progress the build  
Increase Number of 4G Pitches
The savings options agreed to delivery 2024/25 budget have resulted in changes to sports pitches. The Grounds Service maintain grass pitches
utilised for sports activities throughout West Dunbartonshire. This proposal is to build three new 4G pitches to replace six underutilised grass
pitches located in Alexandria, Dumbarton and Clydebank.  There would be an initial Capital investment of £2m required. The saving would be
made up of a combination of increased income due to all weather availability of pitches and a reduction in maintenance costs of the existing
grass pitches. The other grassed pitches will no longer be maintained or lined, and community asset transfer or alternative uses will be explored,
including open space for general use. In 2024/25 we will undertake the design and procurement exercise to deliver the 3 4G pitches.

Page 10

Implementation of the waste Strategy 
In accordance with the Waste (Scotland) Regulations 2012 which was subsequently reviewed in 2019 landfilling of Biodegradable Municipal
Waste to landfill will be banned by 2025, this waste will need to require a form of treatment or processing at dedicated waste treatment facilities
at that time. The Council have two main initiatives which are being progressed; 
1. Continue to work collaboratively to develop a best value proposal for procuring the reception, transportation, treatment and compliant disposal
of biodegradable municipal waste; and
2. Complete the feasibility study following approval of the preferred location and commence detailed design of the construction of a resource,
recycling and reuse centre, RRRC, within the Council’s boundary in order to improve the Council’s ability to access wider waste treatment
markets and will liaise with Zero Waste Scotland on external funding opportunities to support this. Internal funding of £2M has been secured for
this programme. In 2024/25 we will complete the feasibility study and develop a detailed design for the preferred location of the RRRC and
prepare for tender process.
Fit for Future Action Plan – Waste Services
Following the Fit for Future service review undertaken in April 2021, an action plan is being taken forward which will address the key findings
over a five year period 2021-2026. These include improving and streamlining the customer journey, the website and on line forms. The services
include recycling, the DRS, missed bins, bulky and special uplifts. Matters raised in relation to staffing vacancies, turnover, hierarchy, and spans
of control, together with the availability of training and development to support employee wellbeing, are all being addressed in the plan. Route
review has now been completed and implemented.  In 2024/25 we will progress the implementation of the prioritisation of the collection of
recycling.  
Waste Services – Charging Structure
The savings options agreed to deliver the 2024/25 budget have resulted in changes to the charging structure for some waste services. Domestic
Garden Waste collection is currently uplifted free of charge. Residents who wish to have their garden waste uplifted will require to buy a permit.
The annual cost of the permit will incur a £60 annual fee. The waste service undertake commercial waste collection for businesses within the
West Dunbartonshire area, this service will incur a 14% increase in fees. In 2024/25 we will implement increased fee structures.
Capital Investment Team, Consultancy Services, Compliance Team and Fleet Management
Depot Refurbishment
Following a review of the complete depot estate and preparation of a feasibility report it is proposed to refurbish the current estate due to cost
restrictions. Evaluation of essential repairs and essential upgrade works to the offices within depots is complete. In 2024/25 a feasibility report of
garage services will be carried out as the top priority project. Once received a plan of work will be developed including detailed design work.
Following this, the Depots Project Board will be re-introduced and the programme will progress.

Page 11

Faifley Campus
The Council approved plans in September 2023 to create a new education and community campus on the site of the current St Joseph’s
Primary. This significant capital investment programme will bring together a number of education and community facilities. The planning
application has been approved and construction on site started in February 2024. In 2024/25 we will continue with Phase 1 construction
programme of the Faifley Schools Community Campus in line with current programme. A specific Learning Estate Project Boards meets to
discuss this project providing governance and monitoring.
Exxon – City Deal Project
The Glasgow City region deal is an agreement between the UK Government, the Scottish Government and eight Local Authorities across
Glasgow and the Clyde Valley to invest in communities across Scotland. A major industrial and commercial development at the former
ExxonMobil terminal in Bowling West Dunbartonshire is underway with detailed planning approval in January 2024. In 2024/25 we will continue
to progress with the development phase of the Exxon Project in line with the current programme which awaits Exxon remediation of land to be
transferred and conclusion of 3rd party land agreements. A specific Exxon Project Board meets to discuss this project providing governance and
monitoring.
Artizan Demolition 
The Council were awarded levelling up funds in 2021 for the redevelopment of the Artizan centre, to enhance Dumbarton town centre. The
demolition project started on site in February 2024. Contractors have been appointed and on site work has started. The next phase, including
demolition will progress in 2024/25. 
Transition to Electric Fleet
The service is developing a transition to electric fleet strategy in response to the National agenda for decarbonising transport. The strategy will
set out a programme of implementation of fleet procurement and disposal, charging infrastructure and consider financial implications for each
future financial year. The strategy will be completed in financial year 2024/25.
Reduce Fleet Hire Costs 
The savings options agreed at Council in December 2023 have resulted in agreement to reduce hire costs of current fleet to realise a saving of
£100K. The priority area for hire cost reduction have been identified. We will develop a procurement strategy and plan showing best value route
to market.  
Consultancy Services/Capital Investment Team Review
Following agreement at the Council Meeting in March 2024, the Consultancy Services and the Capital Investment Team will progress a review to
deliver saving. The team will prioritise supporting the delivery of HRA projects and the General Services Capital Programme.

Page 12

Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Roads & Neighbourhood priorities for 2024/25.
Appendix 1 sets out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions
• strategic and/or service risks
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership; while service risks relate to service delivery and represent the potential for impact on
individual services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service
users and clients in receipt of the services provided. In identifying the relevant risks for 2024/25 and actions to mitigate them, the aim is to
improve or maintain the current position (i.e. the current risk score) set out in the appendix.
Continuous Improvement
Continuous improvement is central to all that we do. The actions set out in this section as well as those at an operational level not included in
this Delivery Plan, demonstrate our commitment to continuous improvement and take account of the wider Best Value focus on vision and
leadership; governance and accountability; effective use of resources; partnerships and collaborative working; working with communities;
sustainability; and fairness and equality.
4. Resources
Finance
The Finance team are currently creating the detailed service budgets to accurately reflect all savings, management  adjustments and other
budget adjustments agreed by Council on 6 March 2024. Once this is complete the service plans will be updated with each Service’s Gross
Expenditure, Gross Income and Net Revenue Expenditure Budgets. 
Employees
Employee Numbers
The headcount and full time equivalent staff in each service area (as of 31st March 2024) are as follows:
Service Area Headcount FTE
Fleet & Waste 144 136.89

Page 13

Absence in 2023/24
The quarterly absence statistics for Roads & Neighbourhood are shown below together with the Council average for the same periods for
comparison. The figures have been higher than the Council average in 2023/24:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Roads &
Neighbourhood
3.25 4.11 4.94 5.20 15.17
COUNCIL WIDE TOTAL 3.41 3.02 4.64 4.81 12.91
Appendix 1: Action Plan
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Greenspace 142 134.63
Roads & Transportation 83 59.92
Capital Investment Team, Consultancy Services,
Compliance Team 
25 22.80
TOTAL 394 354.24

Page 14

Performance Indicator Target 24-25 Owner
Percentage of emergency road related defects repaired within 4 hours of being reported 95% Liam Greene
Percentage of non-serious road related defects repaired within 7 working days of being reported 85% Liam Greene
Percentage of routine road related defects repaired within 28 working days of being reported 85% Liam Greene
RL2: Percentage of all traffic light repairs completed within 48 hours 98% Liam Greene
RL3: Percentage of all street light repairs completed within 7 days 95% Liam Greene
Action Due Date Owner
Pavement parking, develop and implement the enforcement strategy in line with Scottish guidance next phase 31-Mar-2025 Liam Greene
Progress plan to introduce Parking Enforcement 31-Mar-2025 Liam Greene
Objective 2. Our residents health and wellbeing remains a priority
Action Due Date Owner
Upgrade 8 play parks and construct 4 new MUGA’s 31-Mar-2025 Ian Bain
Prepare a plan to increase the number of 4G pitches 31-Mar-2025 Ian Bain
Objective 3. Our residents are supported to increase life and learning skills

Page 15

Action Due Date Owner
Progress Faifley Campus in line with agreed programme 31-Mar-2025 Craig Jardine
2. Our Environment
Objective 4. Our local environment is protected, enhanced and valued
Performance Indicator Target 24-25 Owner
Percentage of residents satisfied with the street cleaning service 73% Ian Bain
Percentage of residents satisfied with the Waste service overall 82% Ian Bain
Percentage of residents satisfied with Parks & open spaces 85% Ian Bain
Percentage of missed bins collected within 3 working days of being reported 95% Ian Bain
Percentage of offensive graffiti removed within 24 hours of being reported 100% Ian Bain
Percentage of non-offensive graffiti removed within 5 working days of being reported 100% Ian Bain
Percentage of total household waste that is recycled 60% Ian Bain
Percentage of abandoned vehicles that require to be removed by the council that are removed within 14 days 100% Ian Bain
Tonnage of biodegradable municipal waste landfilled 13,300 Ian Bain

Page 16

Action Due Date Owner
Finalise the delivery of two new allotment sites 31-Mar-2025 Ian Bain
Develop a new local bio diversity action plan 31-Mar-2025 Ian Bain
Develop ash die back action plan 31-Mar-2025 Ian Bain
Objective 5. Our resources are used in an environmentally sustainable way
Action Due Date Owner
Develop detailed design and costings for the resource recycling and reuse centre (RRRC) 31-Mar-2025 Ian Bain
Progress development of a best value proposal for the management of biodegradable municipal waste 31-Mar-2025 Ian Bain
Develop the procurement model for the phased delivery of public and fleet charging infrastructure including
consideration of the Implementation Strategy and Expansion Plan. 31-Mar-2025 Liam Greene
Develop Strategy for transition to electric fleet 31-Mar-2025 Craig Jardine
Objective 6. Our neighbourhoods are sustainable and attractive

Page 17

Performance Indicator Target 24-25 Owner
Percentage of residents satisfied with roads maintenance 40% Liam Greene
Percentage of Class A roads that should be considered for maintenance treatment 24% Liam Greene
Percentage of Class B roads that should be considered for maintenance treatment 24.5% Liam Greene
Percentage of Class C roads that should be considered for maintenance treatment 30% Liam Greene
Percentage of unclassified roads that should be considered for maintenance treatment 37% Liam Greene
% of Special Needs Adaptation projects completed by consultancy services from receipt of referral to carrying
out survey, design and submission of building warrant within 60 day target for type 3 projects.
70% Craig Jardine
% of Consultancy Services project deliverables for Housing and General Services projects that were delivered
to programme.
80% Craig Jardine
Action Due Date Owner
Progress plan to change the method used for road defect repairs 31-Mar-2025 Liam Greene
Review any representations received following the notification of the scheme and finalise detailed design for
the construction of the Gruggies Burn Flood Management 31-Mar-2025 Liam Greene
Consider the initiatives recommended within the draft surface water management plans and present to
Council for consideration and budget allocation
31-Mar-2025 Liam Greene
Undertake flood management Improvement Study for Dumbarton and Vale. 31-Mar-2025 Liam Greene
Prepare a plan to uncover issues relating to roads satisfaction levels and agree an action plan to influence
them.  31-Mar-2025 Liam Greene

Page 18

Risk Description Current Assessment Target Assessment Owner
Impact of major adverse
weather incidents on
services
A significant period of adverse weather may result on
failure to deliver key operational functions of R&N
services
Ian Bain
Failure to maintain road
network during adverse
weather
A significant period of adverse weather may result in
failure to deliver key operational functions of R&T
services
Liam Greene
Failure to manage and
maintain the road
network effectively
Failure to manage and maintain the road network
effectively will have an adverse impact on user safety,
traffic movement, air quality, economic growth and
reduce access to facilities and amenities. The
Council’s reputation as a place to live and work with
access to employment, education, leisure and health
opportunities would be adversely affected.
Liam Greene
Challenges in delivering
effective services in
relation to Roads &
Neighbourhoods
The risk that the Council fails to deliver on the three
services within Roads & Neighbourhood: Roads &
Transportation, Fleet & Waste and Greenspace.
These areas provide services across a range of areas
including managing and maintain roads, footpaths and
associated infrastructure, managing flood risk,
grounds maintenance, street cleaning, burial and
cremation, outdoor facilities, waste and recycling and
vehicle fleet management. Failing to ensure these
services are not fully fit for purpose could result in
adverse consequences in relation to delivering
efficient and effective services. 
Gail Macfarlane

Page 19

3. Our Economy
Objective 7. Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Objective 4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and learning and development plans to
enable capabilities, improve resilience and promotion of a diverse workforce 31-Mar-2025 All Managers
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce.
31-Mar-2025 All Managers
Action Due Date Owner
Progress demolition of Artizan Centre within agreed timeframes – next phase 31-Mar-2025 Craig Jardine
Support the progress of Exxon City Deal Project 31-Mar-2025 Craig Jardine

Page 20

Action Due Date Owner
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies
31-Mar-2025 All Managers
Develop and implement learning and development opportunities to improve capabilities and resilience within
the workforce.
31-Mar-2025 All Managers
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Target 24-25 Owner
% of capital projects supported by capital investment team, delivered within agreed plan 80%  Craig Jardine
Action Due Date Owner
Work jointly in partnership with Glasgow City Council and the wider City Region to progress collaborative
working opportunities. 31-Mar-2025 Gail Macfarlane
Complete phase 3 of the Fit for Service review of waste services, implementing the prioritisation collection of
recycling 31-Mar-2025 Ian Bain
Progress new charging structure for garden waste and commercial 31-Mar-2025 Ian Bain
Implement revised service provision for school crossing patrols, roads activity within education and roads
services 31-Mar-2025 Liam Greene
Progress Depots Refurbishment Programme in line with agreed timeframe 31-Mar-2025 Craig Jardine

Page 21

Action Due Date Owner
Implement Consultancy Services/ Capital Investment team restructure 31-Mar-2025 Craig Jardine
Reduce fleet hire costs 31-Mar-2025 Craig Jardine
Risk Description Current Assessment Target Assessment Owner
Challenge to delivery of
burial and cremation
services
A number of factors may impact on ability to deliver
these services.  For example a pandemic would
create significant immediate demand on services.
Ian Bain
Inability to deliver priority
services as a result of
fuel shortages
A fuel shortage would significantly impacting on our
ability to provide priority service across West
Dunbartonshire.
Gail Macfarlane