Appendix 1 - HOUSING EMERGENCY – LOCAL HOUSING STRATEGY ANNUAL UPDATE 2025

Argyll and Bute Council · 26 November 2025
Back to Argyll and Bute Council — 26 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … 
.
Annual Update 2025
LOCAL HOUSING
STRATEGY

Page 2

2 
Contents              Page 
Abbreviations……………………………………………………………….... 3
Introduction ………………………………………………………………….. 4
Reflection of the Last Year ………………………………………………...... 4
Housing Emergency…………………………………………………………... 6
LHS Outcome One: Housing Supply and Place-Making………….……… 8 
Housing System Context………………………………………………...….... 8
Demographic Changes…………………………………………………..….... 11
Housing Demand…………………………………………………………….... 12
Housing Transactions……...………………………………………………..... 13
Affordable Housing Supply ………………………………………………...... 14
Increasing Supply via Other Initiatives ……………………………………... 16
Making Best Use of Existing Stock / Empty Homes …………………….... 17            
LHS Outcome Two: Energy Efficency, Climate Change & Poverty….  19
Energy Efficiency, Climate Change and Poverty Indicators……………..... 19
Energy Efficiency and Fuel Poverty………………………………………….. 21
Housing Improvement................................................................................ 23
Poverty – Maximising Income..................................................................... 24 
LHS Outcome Three: Specialist Provision and Independent Living… 26 
Specialist Provision and Particular Needs – Contextual Indicators............. 26 
Health and Social Care.............................................................................. 27
Gypsy/Travellers........................................................................................ 29
Equalities Monitoring.................................................................................. 30         
LHS Outcome Four:  Housing Options, Information & Support……… 31
Homeless Context....................................................................................... 32
Housing Options, Information and Support................................................. 34
Housing Support......................................................................................... 37 
Local Housing Strategy Action Plan – Progress 2024/25……………... 38 
Appendix 1 – Housing Emergency Action Plan – Progress 2024/25........ 47

Page 3

3 
Abbreviations 
The list below is a reference to the abbreviations frequently used in this document.   
ACHA – Argyll Community Housing Association
CAB - Citizens Advice Bureau 
CHAT - Community Housing Assessment Tool
CHR – Common Housing Register (HOMEArgyll waiting list)
EES-ABS - Energy Efficiency Scotland: Area Based Scheme  
EESSH – Energy Efficiency Standard for Social Housing
EHN - Empty Homes Network 
EPC - Energy Performance Certificate 
HCS – Housing Contribution Statement 
HES - Home Energy Scotland 
HNDA – Housing Need & Demand Assessment
HSCP – Health & Social Care Partnership
H&L – Helensburgh and Lomond 
I,J & C – Islay, Jura and Colonsay
LA – Local Authority
LDP2 - Local Development Plan 2
LHLR - Local Housing Land Requirement 
LHS – Local Housing Strategy
LHEES – Local Heat and Energy Efficiency Strategy
LIFT – Low-cost Initiative for First Time Buyers
MATHLR - Minimum All-Tenure Housing Land Requirement 
NPF4 – National Planning Framework 4
NSSE – New Supply Shared Equity (Affordable housing model/initiative)
NRS – National Records of Scotland
OMSE – Open Market Shared Equity
PADP - Pension Age Disability Payment
PSHG – Private Sector Housing Grant
RSL – Registered Social Landlord (Housing Association)
SHIP – Strategic Housing Investment Plan
WHHA – West Highland Housing Association

Page 4

4 
1. Introduction 
Following publication of the Argyll & Bute Housing Need & Demand Assessment in
2021, the Council’s Local Housing Strategy (LHS) was launched in April 2022,
covering the planning period 2022/23 to 2026/27. 
The LHS sets out a detailed Action Plan, which provides the framework for reporting
annual progress on the delivery of our strategic objectives and the LHS Vision. 
“Everyone in Argyll & Bute has access to a suitable, high-quality home which
is affordable and located within a vibrant, sustainable and connected
community” 
Outcome 1: Housing Supply and Place-making     
Outcome 2: House Condition, Energy Efficiency and Poverty                               
Outcome 3: Specialist Provision and Independent Living  
Outcome 4: Housing Options, Information and Support 
The Action Plan at the end of document provides full details of progress around the
four LHS Outcomes for 2024/25 against the baseline and previous year's figures. 
The LHS Action Plan has been interlinked to the Housing Emergency Action Plan
available at Appendix 1.  The Housing Emergency Action Plan will be fully integrated
into the next Local Housing Strategy in 2027. 
2. Reflection of the past year 
Over the last year, we have again experienced continual changes to the local and
national housing markets, political environment, legislative framework, and our
economy that are impacting many of the services, residents, and businesses in
Argyll and Bute. 
There have been a number of notable housing documents published over the year
which affect the delivery of housing and services across the area. Whilst not an
exhaustive list, this is some of the key documents which are hyperlinked to access
further information. 
• Rural and Islands Action Plan Update – December 2024
This provides details of progress across key themes of, Enabling the delivery of
more high-quality affordable homes; Making Best Use of Existing Homes; Supporting
Community-Led Development; and Housing and Economy. 
• Children’s Rights and Homelessness in Scotland – January 2025
The Improvement Service briefing provides an overview of homelessness in
Scotland, examines its impact on children’s human rights, and offers guidance on
adopting a children’s rights-based approach to tackling homelessness.

Page 5

5 
• Housing Insecurity and Hidden Homelessness in Scotland, Research 2025
This research considers the nature of those experiencing hidden homelessness;
investigates people’s experiences relating to hidden homelessness; and makes
policy recommendations to help improve the understanding of all forms of
homelessness including ensuring that homelessness and support services are
accessible to all. 
• Scotlands Population Health Framework 2025-2035
This document sets out a new framework in creating and maintaining good
physical and mental health and wellbeing. It signifies a shift in culture, from
treating illness to prevention and a more whole system approach to improving
health. 
• Health & Social Care Service Renewal Framework 2025-2035
The new framework provides a high-level guide for change, to ensure the
sustainability, efficiency, quality, and accessibility of health and social care
services in Scotland; and builds on the Operational Improvement Plan and
Population Health Framework. 
• Land Supply for Housing in Rural Scotland, February 2025
This report aims to further develop the report by the Scottish Land Commission
(Reid et al, 2020) to help provide a 10-year pipeline of effective land for projects
to meet the housing need and demand in rural communities.   
• Independent Working Group on Antisocial Behaviour: review, 2025
This review, identified several overarching observations and recommendations
that provide a foundational perspective on the challenges and opportunities in
relation to designing a fair and effective response to antisocial behaviour. 
• Regional Transformational Opportunities in Highlands and Islands, 2025
This study aims to provide an evidence base of the current activity, strengths,
challenges, and opportunities considering the period 2025-2040. The study
includes estimated needs for affordable housing to meet workforce requirements. 
• Housing Investment Taskforce Report, March 2025
The report provides overview on the seven workstreams adopted by the
Taskforce. 
o Workstream 1 - Housing Bill – rent control measures 
o Workstream 2 - Housing investment and potential for adopting good practice 
o Workstream 3 - Long lease finance/income strip and other mechanisms to
deliver affordable homes
o Workstream 4 - Affordability and flexibility of finance and borrowing limitations
to fund affordable housing 
o Workstream 5 - Home ownership
o Workstream 6 - Delivery through new partnerships for housing development
o Workstream 7 - ‘Stalled’ sites and potential interventions

Page 6

6 
• The Housing (Scotland) Bill, March 2024  
A significant change in housing law, the Bill introduces changes in relation to
housing, and covers protections for tenants, preventing homelessness, rent
controls, evictions and other housing matters. The Bill is progressing through
various stages before full implementation and there have been a number of
consultations relating to the measures contained which have resulted in
amendments to original proposals.  These include giving powers to request
additional information from private sector landlords, and the level of the rent
cap of CP1 + 1% up to a maximum of 6% has also been agreed.  Progress on
the stages, will be closely monitored and highlighted to partners. 
• Argyll and Bute Council Corporate Improvement Plan 2025-2028, 2025
Housing, Economic Growth, and Population remains a priority for the Council
as outlined in the Plan. 
3. Housing Emergency 
In June 2023, Argyll and Bute Council was the first Local Authority in Scotland to
declare a Housing Emergency, due to the significant housing pressures that many of
our residents are experiencing.  Since then, the Scottish Government, Chartered
Institute of Housing, and thirteen Local Authorities have declared a Housing
Emergency.   
Argyll and Bute Response to Housing Emergency
Our priorities to address the housing emergency have been grouped into four key
themes: 
1. Enabling the delivery of more market homes in Argyll and Bute
2. Enabling the delivery of more affordable homes in Argyll and Bute
3. Enable the delivery of more homes for Argyll and Bute’s workforce
4. Make the best use of existing homes in Argyll and Bute 
Council Officers are working on several new work streams to address the housing
emergency and liaising closely with partners on the Housing Emergency Action
Programme to take forward the delivery of the identified priorities. An overview of
action and regular updates on various work streams are published on Housing
Emergency Webpage which can be accessed here - Housing emergency | Argyll and
Bute Council (argyll-bute.gov.uk)   
Depopulation Funding 
The Council’s successful bid to the Scottish Government Addressing Depopulation
Fund has provided the service with additional resource to deliver a number of key
outcomes to address the housing emergency. This includes, providing tailored
support for private sector landlords in an effort to preserve the sector; assisting local

Page 7

7 
employees and employers with tailored housing advice to address depopulation; and
increasing housing options to meet the varying needs of the population. 
In addition to the appointment of a Private Sector Housing Officer, a research project
is being undertaken which will provide an important insight into the housing
emergency in Argyll & Bute, including ways to address the declining population of
younger and working age households by investigating workforce housing solutions
and mapping housing journeys. 
We are working to implement the recommendations for the Council highlighted in the
recent report ‘The Challenges faced by rural landlords: The case of Argyll and Bute’,
such as the introduction of a landlord advice hub on the Council website; the
provision of regular landlord newsletters and seminars; and a review of enforcement
activities. These actions, in addition to the provision of tailored support and ongoing
monitoring of relevant data, are hoped to mitigate the depopulation risks posed by
the anticipated large-scale reduction of the private sector rental market. 
Work is also being undertaken to investigate further housing opportunities such as
Mid-Market Rental (MMR) properties and support for those homeowners seeking to
transition from existing short-term let properties into longer-term rentals. 
Scottish Government – National response to the Housing Emergency
The Scottish Government acknowledged Scotland’s Housing Emergency in June
2024. In response, they published a National Housing Emergency Action Plan for
Scotland; detailing steps for how the Scottish Government should tackle the
emergency.   
In April 2024, the Scottish Government established the Housing Investment
Taskforce bringing together key interests of investors and investees to identify
actions that will unlock both existing and new commitments to investment in housing
across all tenures. The remit of the Taskforce is to: build investor confidence and
attract further mobile capital investment into housing; unlock existing financial
commitments; encourage and promote new delivery partnerships; and identify ways
to shift the balance of investment in affordable housing to increase private funding,
including from relevant comparator markets and jurisdictions.  Further information on
the work of Taskforce is available here - Housing Investment Taskforce - gov.scot   
The Scottish Government published ‘Planning and the Housing Emergency –
Delivery Plan’ in November 2024, which sets out how the planning system has a key
role in facilitation more homes to address the housing emergency.

Page 8

8 
4. LHS OUTCOME ONE: HOUSING SUPPLY AND PLACE-MAKING 
LHS strategic aim one is: To facilitate access to sufficient, suitable and
affordable housing across all tenures, and the associated strategic objectives are
to: 
4.1 LHS OUTCOME ONE: HOUSING SYSTEM CONTEXT 
Argyll & Bute Council Tax Register recorded a total of 49,854 dwellings in April 2025,
a slight increase on the 2024 total of 49,348. This includes all tenures of housing,
which are registered as domestic dwellings. 
There are approx. 8,159 HOMEArgyll properties, in addition we have information on
Bield, Link, Cairn & Trust social housing stock (793) taking these into account
increases estimated total to 8,952 (18%) registered social housing properties across
Argyll and Bute. 
Around 4,454 (8.9%) of properties are privately rented. The number of private rented
properties has decreased further from 5,697 in 2023 and 4,531 in 2024. Whilst some
landlords may have left the sector, there are various reasons for reduction in
numbers including cleansing of data records, removal of properties rented to family;
backlog of applications which may include renewals; and changes of tenure. 
Through the Depopulation Fund, our Private Sector Settlement Officer is working
with landlords to try to mitigate further reduction in the private rented sector.

Page 9

9 
Table 4.0: All properties in Argyll and Bute on Council Tax register as of April 2025
Council
Tax
records
Bute
Coll
&
Tiree
Cowal H&L I,J&C Kintyre Lorn Mid
Argyll
Mull
&
Iona
Total
All
properties 4312 721 8855 12442 2355 4192 9139 5806 2032 49,854 
Second Homes and Empty Homes 
Approx. 5,964 nearly 12% of properties in April 2025, on the Council Tax register
could be classed as “ineffective” which means they are not being utilised as
someone’s main residence. These comprise of long-term empty properties; empty &
exempt* properties; second/holiday homes and job related or purpose-built holiday
homes. 
Table 4.1: Ineffective Stock in Argyll and Bute as of April 2025
* Exempt properties i.e. Deceased owner; Living/detained elsewhere; Empty under Statue; Under
renovation; Held for demolition etc. 
Approx. 5.2% of properties were registered as second homes.  The figures fluctuate
between Housing Market Areas and are as low as 1.1% in in Helensburgh & Lomond
but rise to 25.7% in Coll & Tiree. Within some settlement areas this percentage can
be a lot higher.  Argyll and Bute Council, in line with many other Local Authorities in
Scotland, doubled the Council Tax on Second Homes from 1st April 2024.  The
number of second homes within Argyll and Bute has reduced from 2,811 in April
2024, to 2,605 in April 2025, showing an overall deduction of 7.3%. 
There are various reasons properties are registered as empty such as natural
changes between selling and moving home, renovation works, change of use of
property, and in some instances, owners want to retain ownership and are not pro-
actively seeking to bring them back into use.  Over the last year we have seen a
significant increase in the number of registered empty properties which could be
affiliated to some of the reasons outlined above and linked to changes to Council
Tax qualifying criteria and on-going review of occupancy status.   As of April 2025,
Council Tax –
April 2025 Bute
Coll
&
Tiree
Cowal H&L I, J
&C Kintyre Lorn Mid
Argyll
Mull
&
Iona
Total
Long-term
empty 123 11 169 161 48 110 153 126 42 943
Empty –
subject to
200% levy
107 30 233 147 141 126 211 160 107 1,262
2nd/holiday
homes 397 185 501 142 262 176 376 385 181 2,605
50% discount 8 2 171 5 0 5 33 17 3 244
Exempt* &
Empty 132 26 182 183 34 127 115 80 31 910
Total 767 254 1256 638 485 544 888 768 364 5,964
% of
ineffective
stock
18% 35% 14% 5% 21% 13% 10% 13% 18% 12%

Page 10

10 
there were approx. 2,205 registered empty homes (excluding those exempt &
empty), compared to 1,451 in April 2024, an increase of 52% which is spread across
all Housing Market Areas.  The changes are being monitored, and our Empty Homes
Officer is engaged with a number of owners to assist them with options to bring
homes back into use. 
The following graph shows the number of registered second and empty homes in
April 2024 and 2025. 
Graph 4.2: Second and Empty in Argyll and Bute as of April 2024 and 2025 
Short Term Lets
There are 1,742 properties registered as self-catering lets (commercial) which are
not included in Council Tax Register figures above as these are registered as
businesses and subject to Rates. 
In addition, as of April 2025, there were 2,949 properties in Argyll and Bute which
have applied for a short-term let licence.  Due to the variation in the ways in which
short term let properties can be registered, some of these properties will be
accounted for in Council Tax and Self-Catering let figures. 
Table 4.3: Self-Catering and Short Term Let Register as of April 2025 
* Information on the different type of licences and the public register is available here    
Short term lets licence | Argyll and Bute Council
0
500
1000
1500
2000
2500
3000
Bute Coll &
Tiree
Cowal H&L I, J & C Kintyre Lorn Mid
Argyll
Mull &
Iona
Total
Council Tax - Second and Empty Homes 2024 and 2025
Total Empty Homes April 2024 Total Empty Homes April 2025
Total Second Homes - April 2024 Total Second Homes - April 2025
Self-Catered Lets
& Short Term
Lets- April 2025
Bute
Coll
&
Tiree
Cowal H&L I, J
&C Kintyre Lorn  Mid
Argyll
Mull
&
Iona
Total
Self-Catered Lets 84 66 246 140 167 107 460 201 271 1,742
Short Term Let
Licence
applications*
139 97 374 307 282 162 817 345 426 2,949

Page 11

11 
4.2  LHS OUTCOME ONE: DEMOGRAPHIC CHANGES 
As reported by the National Records of Scotland (NRS) Household and Dwellings in
Scotland 2024 report, there has been a bigger percentage increase in households than in
the population in each Council area over the last twenty years. For Argyll and Bute for
period 2004-2024 there has been a 7.5% increase in households, compared to a 3.43%
reduction in our population for period 2003-2023. 
Household projections – The National Records Scotland (NRS) estimated that between
2018 and 2028, the number of households in Argyll and Bute was projected to decrease by
2% from 41,630 to 40,803. Whilst a decrease was expected, there was a slight increase
from 2018-2022; with only a 0.1% reduction reported between 2022 and 2023.  This has
subsequently reversed with estimates of 0.5% increase between 2023-2024.  During the
period 2014 (40,852) to 2024 (42,831) household numbers have increased by 1,979 (4.8%). 
Table 4.4: NRS Argyll and Bute Household Estimates 2020 - 2024 
AREA 2020 2021 2022 2023  2024 Change
2023/24
Argyll and
Bute 41,839 42,384 42,664 42,610 42,831 +0.5%
Scotland   2,507,625 2,528,823 2,549,797 2,535,310 2,552,388 +0.7%      
Reference: NRS Households and Dwellings in Scotland, 2024  
Population Estimates - The NRS updated their mid-year population estimates in 2024 to
take into account improvements in the figures for international migration. 
Table 4.5: NRS Mid-Year Population Estimates Argyll and Bute 2019-2023   
Year Population Estimate – 
Argyll and Bute
Population Estimate – 
Scotland
2019 87,360  5,411,200
2020 87,160  5,408,900
2021 87,960  5,412,900
2022 87,930  5,447,000
2023 87,810 5,490,100 
Reference: NRS Population Estimates Time Series Data – January 2025 
Migration - NRS Migration Data from mid-2011 to mid-2021 has been revised following
2022 Census and updated long-term international migration data. The variances* from
previous reporting in the LHS have been added to Table. 
Table 4.6: NRS Migration Estimates 
INDICATORS  2019/20*  2020/21 * 2021/22  2022/23
TOTAL IN-MIGRATION  (3,430)  (5,280)  4,220 4,050 3,550 5,350
TOTAL OUT-MIGRATION  (3,530) (4,070)  3,770 3,590 3,440 4,160
TOTAL NET MIGRATION  (90) (1,220) 450  460 110 1,200
Source: NRS Migration Flows, March 2025

Page 12

12 
4.3 LHS OUTCOME ONE: HOUSING DEMAND 
HOMEArgyll Waiting List and Annual Lets 
There were 3,024 social housing applications across Argyll & Bute as of April 2025,
which is a decrease of 5.8% on the previous year’s total of 3,209. 
663 households were allocated permanent social rented tenancies via HOMEArgyll
(Argyll Community Housing Association, Dunbritton Housing Association, Fyne
Homes, and West Highland Housing Association) in 2024/25.  This is a decrease of
13.1% on the number of lets in the previous year (763) which is below the annual
target of 860 lets. 
Of the 663 relets in 2024/25, 37% were allocated through the homeless list, 21%
were transfers and 42% were allocated to those on the general list. 
Graph 4.7: HOMEArgyll Common Housing Register Graph 4.8: HOMEArgyll Lets 2023/24 &
And Lets  2024/25  
Source: HOMEArgyll Waiting List & Annual Lets 
Based on the HOMEArgyll waiting list and annual lets, this equates to 5 applicants
on the waiting list for each available let.   
Mid-Market Rent - 619 households on the HOMEArgyll waiting list have expressed
an interest in Mid-Market rental properties.   
Shared Equity – The ‘New Supply Shared Equity Scheme (NSSE)’ aims to help
households on low to moderate incomes to buy an affordable new build home. As of
April 2025, there were 501 households interested in the NSSE scheme. 
Open Market Shared Equity (OMSE) – This scheme helps people to buy a home
within a certain price threshold for sale on the open market including the Low-cost
Initiative for First Time Buyers (LIFT). 420 households on the social housing register
expressed an interest in the LIFT as of April 2025. 
3209 3024
763 663
0
1000
2000
3000
4000
2023/24 2024/25
HOMEArgyll Waiting List &
Turnover
Total Applicants on HOMEArgyll Waiting List
Total HOMEArgyll Lets
262
158
343
247
138
278
0
50
100
150
200
250
300
350
400
Homeless Transfer General
HOMEArgyll Lets
2023/24 2024/25

Page 13

13 
4.4 LHS OUTCOME ONE: HOUSING TRANSACTIONS 
The Registers of Scotland Annual Market reporting was updated in 2024 to use
median figures as the main statistical base, instead of average figures reported in
previous years. We have subsequently updated our tables to reflect median prices to
replace previously reported average house prices.   
Property market report 2024-25
As detailed in tables below, in 2024/25, the median sale price in Argyll and Bute has
increased by 2.78% compared to 2023/24, although remained below the Scottish
average. The volume of sales transactions during 2024/25 in Argyll and Bute
increased by 9% on previous year.  However, the number of new build sales has
reduced significantly from 78 in 2023/24 to only 18 in 2024/25.  Argyll and Bute has
higher percentage of cash sales 53% compared to the national average of 33%. 
Market Affordability - To meet the median house price of £180,000 in 2024/25, at
the standard affordable ratio of 3.5 x household income, this would require annual
income of approx. £51,428.  Based on this only 36% of local households would be
able to afford the median house price in Argyll & Bute (Income Source: CACI, 2025). 
Table 4.9: Median Residential Property Prices, 2020/21- 2024-25 
Median
House Prices 2020-21 2021-22 2022-23 2023-24 2024-25
% change -
2023/24 - 2024-25
Argyll & Bute
(All Sales) 156,950 160,000 180,000 175,128 180,000 2.78% increase
Scotland 
(All Sales) 167,000 171,000 185,000 185,000 190,000 2.70% increase
Source: Register of Scotland 
Table 4.10: Sales Activity and Value: All transactions and new build transactions, 2020/21 – 2024/25
Argyll & Bute 2020-21 2021-22 2022-23 2023-24 2024-25
Volume of All
Sales 1833 2044 1833 1649 1798
Value of All Sales
(nearest £million) £334m £397m £405m £361m £389m
Volume of New
Build Sales 97 68 86 78 18
Value of New
Build Sales £24m £17m £25m £23m £5m
Median Price New
Build Sales £242,995 £227,997 £296,286 £338,495 £284,000
Source: Register of Scotland 
Table 4.11: Volume of residential property sales by funding status 2024/25
Volume of residential property
sales transactions by funding
status
Cash
Sale
Sale with
Mortgage Total Cash Sales as
percentage of total
Argyll & Bute 945 853 1,798 53%
Scotland 32,971 67,004 99,975 33%
Source: Register of Scotland

Page 14

14 
4.5 LHS OUTCOME ONE: AFFORDABLE HOUSING SUPPLY 
The Strategic Housing Investment Plan Programme 2023/24
The Strategic Housing Investment Plan (SHIP) sets out the new build affordable
housing supply programme for Argyll and Bute.  During 2024/25, our Registered
Social Landlord (RSL) partners completed 44 new affordable housing units across
Argyll and Bute.  This included 38 units for social rent and 6 properties for New
Supply Shared Equity (NSSE). In addition, Trust and West Highland Housing
Association both acquired a property on the open market, whilst following transfer of
stock to Fyne Homes they completed the renovation works to eight affordable flats in
Rothesay raising the annual completion total to 54.   
Previous SHIP documents had programmed 73 completions for the year 2024/25 so
while this number is lower, it can be explained by delays encountered at various
stages of the house building process. Some delays in delivery of materials or ferry
provision, for example, have necessitated finding alternative solutions which has
delayed some developments. However, several live SHIP projects are currently
progressing onsite for completion in 2025.   
Local Development Plan and Housing Land Supply
Argyll and Bute Council’s Local Development Plan 2 (LDP2) was approved in
February 2024. Regarding housing, it seeks to help deliver new housing of the right
type in the right places to meet the needs and aspirations of the wide variety of
households across Argyll and Bute. Part of this involves ensuring there is an
adequate supply of land on which new housing can be developed. 
Scottish Planning Policy was superseded by National Planning Framework 4 (NPF4)
in February 2023. NPF4 requires that Local Development Plans set out a Local
Housing Land Requirement (LHLR) which is expected to exceed the 10-year
Minimum All-Tenure Housing Land Requirement (MATHLR). The MATHLR for Argyll
and Bute as set out within NPF4 is 2,150 units and this has been translated within
Local Development Plan 2 (LDP2) into a LHLR of 3,000 homes for a 10-year period
commencing from 2020. NPF4 sets out that the Housing Land Audit will monitor the
delivery of housing land. Scottish Government Guidance relating to Housing Land
Audits was published in January 2025 and will be used to help inform future audits. 
Trust HA
Acquisition,
Strachur
Dunbritton
HA
Social Rent,
Helensburgh
West
Highland
Shared Equity
& Social Rent,
Port Appin
West
Highland
Shared Equity
& Social Rent,
Islay
Fyne Homes
Social Rent,
Lochgilphead

Page 15

15 
Delivery of Housing Land Against MATHLR and LHLR to Date
NPF4 sets out the MATHLR for Argyll and Bute is 2,150 units. The LHLR for the 10
period from 2020 as set out in LDP2 is 3,000 units. The total number of completions
between 1/4/2020 and 31/3/2024 is 1129 units. 
Taking into account completions since 2020, the total remaining number of units
from the MATHLR is 1,021 and from the LHLR is 1,871. The 1,129 completions over
the past four years represents 53% of the MATHLR and 38% of the LHLR. 
Self-Build Register 
The Council launched self-build register in 2024 which gives households an
opportunity to register their interest in self-build. This helps us to understand more
about the demand for self-build plots across the area and to explore ways in which it
might be possible for those interested to be brought together. As of July 2025, there
are four households who have registered their interest.   
Community Housing Network
The Community Housing Network (CHN) is a forum where the Council can offer
support to community groups with an interest in improving local housing provision,
and where the groups can share experiences, advice and resources. Fifteen
community groups attend the meetings along with representatives of the Council, the
Scottish Government, HIE and a range of other organisations and stakeholders that
can offer advice and support. 
Two of the community groups are currently bringing modern, high standard new build
homes to completion. Colonsay Community Development Company have developed
nine units for low-cost ownership, affordable rent and worker housing. The
development has included the involvement of MOWI fish farms, who have invested
over £1M to secure allocation rights for two of the units as worker housing. While
Gigha Heritage Trust have recently completed five homes for affordable rent. 
In February 2025, the Council approved a decision to extend the scope of their
Strategic Housing Fund to allow support to be given to community groups for early
feasibility studies for identified housing projects. This helps communities overcome a
common obstacle in housing development by helping with some of the main early
costs in deciding whether a project is feasible or not. Five community groups have
had feasibility funding approved for projects aiming to deliver a total of 31 houses. 
Community Housing Assessment Tool (CHAT)
The Council Housing Service has developed the CHAT process to enable it to
support local communities who express a local housing need. Working with
community groups, the CHAT allows community groups to assess housing need
within small community areas, critically at a geographical level smaller that is
currently available through existing datasets. This allows very local levels of housing
need to be identified and to then feed into the wider HNDA and SHIP processes. In
the last 12 months, Council staff have supported CHAT processes for Dalavich
Improvement Group (which led to a community-led housing acquisition) and
Arrochar, Tarbet and Ardlui Community Council. Further CHAT’s are scheduled for
Kilchrenan Heritage Group and Lochgoilhead Community Council.

Page 16

16 
4.6 LHS OUTCOME ONE: INCREASING SUPPLY VIA OTHER   
INITIATIVES 
The Council continues to explore options to increase the supply of affordable
housing. 
Rural Growth Deal - £3m Housing Investment
Progress is being made to take forward innovative housing projects via Rural Growth
Deal. The Mull project ground works have commenced and will deliver housing for
workers, whilst our Islay project will deliver market value housing for sale with title
burdens to ensure these remain as principal homes. 
Worker Accommodation
The Council are continually exploring opportunities to increase supply of worker
accommodation to support businesses and the local economy.  Including proposals
to expand the HSCP Empty Homes Officer post to cover public and private
employers.   
Buy Back 
The ‘buy back’ of properties to increase the supply of affordable housing continues to
receive regular enquiries from sellers. This is a quick way to increase housing stock
and meet local needs when properties are suitable and there is no risk of existing
households becoming homeless.  In addition, the Council are exploring the
possibility of buying properties on the open market for resale with title burdens which
require primary occupancy. 
Community Housing Network / Projects
Our Community Housing Network continues to progress well and has been
highlighted as best practice example.  A number of community led projects are
progressing.  The Council approved feasibility funding support in February 2025 to
support delivery of community housing projects. 
Off the shelf purchases
Our Registered Social Landlords continually explore the possibility for off the shelf
purchase of new build properties from contractors across the area to increase the
supply of affordable housing.  This is restricted due to the lack of speculative new
build, and we are looking at ways to encourage more private developments. 
Renovation / conversion of existing buildings 
The Council and partners are exploring ways to make best use of existing stock to
increase the supply of housing by converting or renovating existing buildings.

Page 17

17 
4.7 LHS OUTCOME ONE: MAKING BEST USE EXISTING STOCK /     
EMPTY HOMES 
During the financial year 2024/25 the Empty Homes Officer has assisted 40 owners,
allowing 42 empty homes to be brought back into use.  None of the owners benefited
from grant funding. Advice and assistance was the main support provided, with six
owners supported to obtain a reduced VAT rate of 5% on eligible renovation works to
bring their properties back into use. 
Table 4.12 & 4.13: Empty Homes Brought Back into Use by Area and Time Empty 
Properties back in use per HMA  Properties back in use per length of
time empty
B & C 11  Less than a year 3
H & L 4  Between 1-2 years 3
OLI 22  Between 2-5 years 20
MAKI 5  Between 5-10 years 5
TOTAL 42  10 years and over 6   
N/K – e.g. new to CT register 5   
TOTAL 42 
Health and Social Care Partnership (HSCP) Empty Homes Project 
The HSCP Empty Homes project is now in its second year, and since inception, the
project has achieved a number of tangible strategic and operational outcomes.  The
project outcomes support the retention and recruitment of key workforce required to
sustain essential services, making the best use of existing stock, and will yield many
longer-term outcomes for the area, including: 
- Increased partnership working.
- Reducing the number of empty homes/buildings in the area.
- Attracting new households to Argyll and Bute.
- Identifying opportunities, such as buildings suitable for conversion and using
evidence bases to gain support from empty building owners. 
- Improving the outlook, amenity and potential of our communities by
transforming buildings to meet housing needs.
- Sustaining critical health services in areas where the HSCP are struggling to
recruit and staff have been unable to secure affordable accommodation. 
It also directly supports two of the four key elements of the high-level actions within
the Argyll and Bute Council Housing Emergency Action Plan: ‘Enable the delivery of
more homes for Argyll and Bute’s Workforce’ and ‘Make the best use of existing homes
in Argyll and Bute’.

Page 18

18 
Key outputs for the project have included establishing new protocols, networks,
identifying local housing needs including type, size and location of accommodation
staff require, data sharing agreements for partners, and on-going promotion of the
post. There have been many project results to date, a small sample includes: 
• The inception of working groups in areas of high demand. 
• New discretionary Empty Homes Enabler Grant, which is an incentive to
encourage owners, and can be used for associated repair works and other
reasonable costs to bring property back into use quickly to support staff. 
• Agreement and funding commitments secured for a number of major
renovation projects.
• The project has generated significant savings for the HSCP, for example,
estimated savings for six-month period of over £28k for securing affordable
accommodation for two agency staff previously staying in air b&b; and
• Principally securing a range of accommodation options for over ten
employees, from private rentals, social tenancies and repurposing of
buildings.   
The Project has overcome diverse challenges through
problem-solving, negotiation, and collaboration. As
Scotland’s first project of its kind, it earned Argyll and Bute
Council the Innovation Award at the Empty Homes
Network (EHN) national awards in May 2025. Isla Binnie,
HSCP Empty Homes Officer has also received multiple
commendations, including: 
➢ Outstanding Contribution – Shelter Empty Homes Conference
➢ Highly Commended Practitioner of the Year – EHN Conference
➢ Highly Commended Rising Star – EHN Conference 
These accolades highlight the project’s national impact and its vital role in
addressing the housing emergency while supporting essential workers relocating to
Argyll and Bute. 
Proposals are being developed for the next phase of the project which will be rolled
out to include support for public and private employers.   
Picture - EHN Innovation
Award

Page 19

19 
5. LHS OUTCOME TWO: ENERGY EFFICIENCY, CLIMATE CHANGE        
& POVERTY 
The LHS strategic aim two is: To regenerate communities by improving the
quality, condition and energy efficiency of housing and by tackling poverty,
including Fuel Poverty and Child Poverty, and ensuring that Housing
contributes to addressing the wider Climate Change agenda. The associated
strategic objectives are:- 
5.1  LHS OUTCOME TWO: HOUSING SYSTEM - ENERGY
EFFICIENCY & FUEL POVERTY INDICATORS 
Addressing the impacts of Child and Fuel Poverty are key areas of concern for
partners and identified as a priority for the LHS. Improving the quality, condition, and
energy efficiency of properties can have positive outcomes for the household in
terms of reducing poverty levels; the outlook of homes; energy costs; health and
well-being; and contribute to the climate emergency by reducing use of carbon. 
Child Poverty in Scotland remains relatively high despite policy interventions such
as the Scottish Child Payment.  The most recent Scottish Government Poverty and
Income Inequality in Scotland 2021-24 statistics estimate that 23% of children in
Scotland are in relative poverty.  This compares to 20% of working-age adults and
15% of pensioners estimated to be living in relative poverty. The End Child Poverty,  
Local Child Poverty Statistics 2025  estimates that 21.2% of children in Argyll and
Bute were living in poverty in 2023-24, which is down around 1% from the previous
year.

Page 20

20 
Through initiatives such as, income maximisation services, affordable housing
supply and energy efficiency programmes, partners are taking pro-active action to try
to reduce levels of poverty across all cohorts. 
Fuel Poverty can be driven by many different factors, which can include age and
types of buildings; income levels; health conditions; limited choice of fuel types; high
cost of heating properties and how energy is used in the home.  For households in
Argyll and Bute this can be include living in rural areas and being off the gas grid -
approx. 55% of properties in Argyll and Bute are off gas grid. There is not a single
measure that determines the energy efficiency of all dwellings and the level of fuel
poverty being experienced by households. Fuel Poverty Scotland Advisory Panel
reported that an estimated 34% of households in Scotland are currently living in fuel
poverty and 19.4% of households are living in extreme fuel poverty.  Compared to
30% of households in Argyll and Bute who are estimated to be in fuel poverty, with
25% of households estimated to be in extreme fuel poverty (Home Analytics, 2025),
which is above the Scottish average.   The figures for Argyll and Bute will fluctuate
dependent on the locality and could be much higher in rural/remote areas. 
The Scottish Government published a paper in April 2024, ‘The cost of remoteness:
reflecting higher living costs in remote rural Scotland when measuring fuel poverty’
that highlights individuals living in rural and island locations generally face higher
living costs than in urban areas, making it more expensive to meet the minimum
acceptable living standard.  The report sets out the impact of inflation, updated
costings, and considers research on remote rural Scotland minimum budgets. It is
highlighted that the increased minimum need costs for rural and island areas, should
be given consideration when calculating benchmarks for fuel poverty and have
produced new minimum budget uplifts from 2022. 
Energy Performance Certificate (EPC)      CHART 5.0 Estimated EPC in Argyll and Bute
An Energy Performance Certificate
(EPC) provides information about how
energy efficient a building is, and
provides information on measures,
which could improve the energy
efficiency of the building. EPCs rate
buildings on a scale from A to G, with
A being the most efficient. The Home
Analytics database, that is used to
report levels of ‘fuel poverty’ in Argyll
and Bute, is derived from several
trusted sources and therefore some of
the data is extrapolated to determine
overall approximate numbers. EPCs
are the primary data source. As not all residential buildings have an EPC, they have
developed a series of models to predict values for properties with missing data.
Figures reported are estimated and subject to change. The figures are in line with
the data reported by The Scottish Fuel Poverty Advisory Panel. 
7%
26%
32%
16%
13%
6%
EPC Band - Argyll and
Bute
A-B
C
D
E
F-G
Unknown
Source: Home Analytics 2025

Page 21

21 
Table 5.1: Argyll and Bute Estimated Fuel Poverty Levels 
A&B AVERAGE FUEL POVERTY PROBABILITY LEVELS
2025 Estimated % of Properties  
Fuel Poverty = Fuel bill > 10% income after housing costs  30% 
Extreme Fuel Poverty = Fuel bill > 20% income after housing
costs  25% 
Excess cold = Risk property exacerbating health inequalities  9% 
Source: Home Analytics 2025 
Ofgem review and set a level for how much energy suppliers can charge per unit of
energy including the standing charge, on a 3-monthly basis.  Their latest reporting
(Changes to energy price cap | Ofgem) indicates that the price for energy for a
typical household (using gas, electricity and on a Direct Debit payment plan) will
reduce by 7% (£1,720 per year) for the period between July and September 2025. 
However, it was noted that this is a 10% increase on the price cap set for the same
period last year (£1,568 per year).   This, therefore, suggests that energy prices
remain to be a prominent issue and many households will be under pressure to heat
their homes, particularly in winter months. 
5.2  LHS OUTCOME TWO: HOUSING SYSTEM - ENERGY
EFFICIENCY & FUEL POVERTY 
Energy Efficiency Scotland: Area Based Scheme (EES - ABS) 2024/25 (ABS12)
The Energy Efficiency Scotland – Area Based Scheme allows homeowners and
private rented tenants and landlords to access non means-tested grant funding to
install energy efficiency measures in their property.  These reduce energy
consumption and in turn energy bills and contributes towards a reduction in harmful
carbon emissions.  
Argyll and Bute Council was awarded funding of £2,179,827 for the year which has
helped 281 households by installing 342 measures. We have received an award of
£2,229,827 for 2025/26 (ABS 13), with the continued aim of offering energy
efficiency measures throughout Argyll and Bute with particular emphasis on reducing
high levels of fuel poverty associated with island and remote rural areas.  
Argyll Community Housing Association (ACHA) 2024/25
During the year 2024/25 Argyll and Bute Council and ACHA have been planning
further joint works in mixed tenure blocks throughout Argyll and Bute. 
Home Energy Scotland
Home Energy Scotland (HES) ensure that households can access holistic energy
efficiency advice, which is critical to address fuel and child poverty, and also to
encourage fabric improvements to make homes more energy efficient. Home Energy
Scotland are key partners for the Council in delivery of Area Based Scheme, energy
efficiency advice, and funding checks for local residents. During 2024/25 they dealt
with 1,786 referrals across all schemes and interacted with 2,992 households which
is a reduction compared to 3,955 in the same period last year.

Page 22

22 
ALIenergy
ALIenergy works across Argyll and Bute to promote sustainable energy use and
renewable energy generation, to address fuel poverty, and reduce carbon emissions. 
During 2024-25, a total of 873 households in Argyll and Bute were supported by
ALIenergy for Affordable Warmth advice, support and assistance.   
“Client gain from crisis funds we have applied to for help with energy bills, energy
debt and white goods this financial year is £74,013. This does not include estimated
savings from energy saving behaviour, changing to energy efficient appliances,
savings made from improved heat loss after insulation and heating upgrades, etc.
Estimated total client gain for the year including these is around £436,500 (around
£500 per household on average).” ALIenergy reporting 2025.   
Local Heat and Energy Efficiency Strategy (LHEES) 
The Council adopted the Argyll and Bute Local Heat and Energy Efficiency Strategy
(LHEES) and the Delivery Plan in November 2024.  The Argyll and Bute LHEES
vision is: 
“To decrease heat demand by improving the energy efficiency in Argyll and
Bute’s homes and buildings, and reduce carbon emissions by transitioning
to a decarbonised heat source. We are committed to seizing the
community wealth-building opportunities presented by decarbonisation
while ensuring a just transition that addresses fuel poverty.” 
The strategy has identified eight priorities to realise the vision: 
1. Improving grid capacity.
2. Improving skills and the supply chain.
3. Improving knowledge and awareness of decarbonisation pathways.
4. Decarbonising the heat source.
5. Creating energy efficient buildings. 
6. Tackling fuel poverty. 
7. Facilitating sustainable and energy resilient communities. 
8. Ensuring a ‘Just Transition’. 
While the Council has embraced a spatial approach for certain aspects of the
LHEES methodology, it has not confined itself to exclusively utilising a spatial
approach. Utilising a non-spatial approach is necessary because of the sparsely
populated nature of the Council area, which results in only a small number of eligible
households in certain data zones. By selecting properties and households that share
the same characteristics, regardless of their location within the local authority, will
enable the Council and its partners to develop more robust implementation
programmes and ensure value for money as there will be better economies of scale.
Argyll and Bute's LHEES will focus on domestic properties in off-gas grid areas,
which are suitable for either heat pump retrofit or can connect to a heat network or
district heating scheme. It will target properties in the private sector, especially those
within the Private Rented Sector (PRS), as the Heat and Buildings Bill proposes that
these properties will have to meet energy efficiency standards and have a
decarbonised heating system by 2028.

Page 23

23 
The strategy will also focus on owner-occupied homes. The LHEES will prioritise
properties with poor energy efficiency, particularly when this contributes to fuel
poverty. Notably, this initial LHEES will not address mixed-tenure and mixed-use
buildings or buildings in conservation areas. Neither will this iteration of the LHEES
focus on older buildings, which have been categorised as unsuitable for heat pumps
unless they are in a heat network area. 
5.3 LHS OUTCOME TWO: HOUSING SYSTEM CONTEXT –
HOUSING IMPROVEMENT 
The Council’s Housing Improvement Officers work closely with private sector home
owners and wider project teams to deliver housing improvement works via Scheme
of Assistance.  During 2024/25 Officers supported works to 50 properties in 8
tenements across Argyll and Bute contributing £325k of Private Sector Housing
Grant (PSHG) funding to works.  
Table 5.2: PSHG – Housing Repair and Improvement Grants 2021/22 TO 2024/25
Home Repair & Improvement Works Supported via Council 
PRIVATE SECTOR HOUSING
GRANT (PSHG)
2020/21 2021/22 2022/23 2023/24 2024/25
Tenements Repaired 7 6 8 8 8
Individual Units Retained 43 19 22 50 34
Feasibility Grants 5 6 3  5 3
Amenity Grants 2 5 6  6 8
PSHG Investment (* excludes
funding for private sector adaptations)
£89,515 £48,614 £400,671 £150,128 £325,000 
The Housing Service also works closely with colleagues in Economic Development
to support the delivery of the Conservation Area Regeneration Schemes (CARS) and
Town Heritage Initiative (THI) projects.  Funding of over £700k has been committed
from PSHG for projects in Lochgilphead, Dunoon, Rothesay and Helensburgh.   
Table 5.3: PSHG funding for CARS / THI Projects – 2022/23 – 2025/26                        
PSHG funding for CARS/THI projects 
Project PSHG Contribution Tenements No of Properties 
Lochgilphead £364,134 5 20
Dunoon £105,000 1 5
Rothesay £39,784 2 9
Helensburgh £192,500 9 23
Total committed £701,418 17 57

Page 24

24 
5.4 LHS OUTCOME TWO: POVERTY – MAXIMISING INCOME 
A&BC Welfare Rights Service
The Welfare Rights Team aims to ensure that the residents of Argyll and Bute are not
missing out on their entitlement to both UK and Scottish Government administered
benefits and other related help. We provide a free, confidential, and impartial benefits
advice, information, and appeal representation service.
Members of Welfare Rights team are funded by MacMillian Cancer Support so they can
provide an enhanced Welfare Rights Service for people affected by cancer.
The Welfare Rights Service has a key focus on maximising income and reducing poverty.
Support is targeted at some of the most vulnerable in our communities and makes a
significant contribution to tackling fuel poverty by maximising household income. 
In 2024/25 the service helped the residents of Argyll and Bute to claim £5.4 million in
additional benefits that may have otherwise remained unclaimed, thus assisting
independent living & preventing homelessness. This an increase of around £1 million
from 2023/24. 
Table 5.4: Welfare Rights Client Gains 2022/23 to 2024/25 
This figure is well above the internal annual target of £2.75 million. This figure also
contributes to the £10 million income maximisation a key target set out in The Council’s
Local Housing Strategy for 2022/27. It should be noted this “client gain” is not just a
figure. The support provided by Welfare Rights makes a significant impact on
individual’s lives. For example, it may mean being able to put heating on, keep a car
running, replace a broken appliance etc.  
In 2024-25, the team assisted with 468 enquiries about Attendance Allowance or
Pension Age Disability Payment, which are benefits for those over pension age, who
have personal care needs due to illness or disability. This high number of cases reflects
the aging population in the area. An award could increase income by £73.90 or
£110.40 per week with potential to increase other benefit income whilst promoting
independence and wellbeing.
Welfare Rights  2022-23 2023-24 2024-25
Cowal & Bute £651k £777k £705k
Helensburgh &
Lomond £1.445m £1.013m £1.442m
Kintyre & the
Islands £873k £1.072m £1.124m
Lorn and Isles £522k £648k £675k
Mid-Argyll  £833k £948k £1.499m
TOTAL
(rounded) £4.3m £4.5m £5.4m

Page 25

25 
Not all cases have a recorded financial gain, over 314 cases were closed after “general
advice provided” and 410 benefit checks were carried out.  Many of these client’s will
have been signposted to claim benefits themselves. Others may be advised of no
benefit entitlement following a benefit check and be referred/signposted to food banks,
energy advice/vouchers and other support mechanisms available. 
In 2024/2025 the transfer of clients from legacy benefits to Universal Credit and from
Personal Independence Payment to Adult Disability Payment continues and has led to
increased demand for Welfare Rights assistance. This demand is expected to continue
going forward as more clients are transferred over.
Welfare Rights Case study 
An elderly couple were referred to Welfare Rights by the
Housing Team as they were both having difficulty with personal
care. We assisted each of them with applications for Pension
Age Disability Payment (PADP). PADP was awarded resulting in
awards totalling £181.20 per week plus arrears of £2054.10.
This then entitled them to a double Severe Disability Premium meaning they were
able to claim Pension Credit (PC) for the first time. They were awarded PC of
£187.47 a week and arrears of £3749.44.  The couple are now better off by £368.60;
they will also receive full Council Tax Reduction; a free TV license and they will be
entitled to the Winter Fuel Payment. 
“Through the work of A&BC Welfare Rights Service and Citizens Advice
Bureau more than £7.495m of additional benefit income has been secured for
households across Argyll and Bute” 
Citizens Advice Bureau (CAB)
Over 2024/25 Argyll and Bute CAB supported households to get £2.051m in client
financial gain, this was derived from their welfare rights, debt advice and also the
collaborative council tax projects they were working on with the Council. 
Flexible Food & Fuel Fund
Funded by the Scottish Government, the project enables the Council’s Welfare
Benefit team to work with third sector partners including Bute Advice Centre,
ALIenergy and foodbanks, to support people who are struggling for money to cover
food and fuel costs. The Fund provides a one-off cash payment to families on low
incomes to help with food and fuel.  Claimants are offered a second cash payment if
they have engaged with support agencies in financial management. Over 95% of
people receiving the first grant payment engage, get the support they need and
receive a second payment.  With an average financial gain of £1,493 per household. 
Scottish Welfare Fund – Community Care and Crisis Grants 
The Scottish Welfare Fund is there to provide a safety net to vulnerable people on low
incomes through the provision of Community Care and Crisis Grants. These are
available for residents of Argyll and Bute on a low income, to help with daily living
expenses such as food and bills, fuel or heating costs, emergency travel expenses,

Page 26

26 
and for anyone fleeing domestic violence or facing exceptional pressures caused by
loss of income or employment. During 2024/25 – 748 Crisis grants were awarded with
total value of £88,171 and 386 Community Care Grants with total value of £460,964. 
Community Care Grants are provided to help a qualifying individual to establish or
maintain a settled home. They can also be used to support families facing exceptional
pressure. A qualifying individual is someone who, without assistance may be in prison,
hospital, a residential care establishment or other institution; or homeless or otherwise
living an unsettled life. 
Crisis Grants can be awarded in a crisis to meet expenses that have arisen as a
result of an emergency or disaster in order to avoid an immediate threat to health or
safety of an individual or family. 
6. LHS OUTCOME THREE: SPECIALIST PROVISION AND   
INDEPENDENT LIVING 
LHS strategic aim three is: To enable people to live well, with dignity and
independently for as long as possible. The associated strategic objectives are: 
6.1 LHS OUTCOME THREE: SPECIALIST PROVISION &
PARTICULAR NEEDS: CONTEXTUAL INDICATORS 
In 2024/25 the HOMEArgyll partnership of local housing associations rehoused 65 in
specialist accommodation amounting to just under 10% of the total HOMEArgyll lets
that year.  This is a decrease from the 101 specialist lets in 2023/24.

Page 27

27 
This included:
• 29 Lets – Amenity Housing
• 31 lets – Sheltered Housing
• 3 Lets – Wheelchair Accessible Housing
• 2 lets – Supported Accommodation 
In addition, the national specialist associations operating in Argyll & Bute, such as
Link, Cairn, Bield and Trust, accommodated around 58 households and individuals
for particular needs. 
The demand for specialist provision and accommodation for particular needs is
evidenced by households on the HOMEArgyll list who require distinct property types.
As of April 2025, around 25%* of those on the list required some form of specialist
housing including wheelchair suitable housing; housing with support; amenity/elderly
housing; and sheltered housing. 
Further analysis of the HOMEArgyll list highlights several key indicators for the
requirement of particular housing and support services to meet varying needs. 
• 37% state their medical condition is affected by current housing circumstances
• 35% of primary household members declared some form of disability  
• 13% require support or assistance living in their home 
• 7% have severe health issues 
• 6% need to move home to access specialist support services 
• 9% of primary applicants are aged 65-74  
• 6% primary applicants are aged 75 or over (with 13 applicants aged 90+)  
* Applicants can select multiple housing options including General Needs/ Mainstream housing,
therefore there may be a small element of double counting across the figures if applicants have selected
more than one housing option. 
6.2 LHS OUTCOME THREE - HEALTH & SOCIAL CARE 
The LHS vision and outcomes support the overarching objectives of both the HSCP
Strategic Plan and the Argyll and Bute Outcome Improvement Plan, as well as
helping to address the national housing, health and well-being outcomes for
Scotland. The housing sector has an important and direct contribution to make to
these national health and well-being outcomes as well as the local service priorities
identified in the HSCP Strategic Plan. 
Partnership working and investment will help to increase the provision of affordable
housing and aids and adaptations across all tenures; improve the condition and
energy efficiency performance of homes; and deliver support, advice and assistance
on a range of housing options, as well as tackling poverty, improving health and well-
being, and generating additional income / benefits for vulnerable households.

Page 28

28 
The HSCP co-produced 2024 Joint Strategic Needs Assessment (JSNA) is aligned
to the HNDA for Argyll & Bute and considers the current and future health needs of
our population and informs the Housing Contribution Statement.  An updated Argyll
& Bute Housing Contribution Statement (HCS) was approved in March 2025,
following a comprehensive revision for inclusion in the Health Social Care
Partnership’s (HSCP) Joint Strategic Plan for 2025/30. The HCS is now a five-year
document reflecting the timeframe for Joint Strategic Plan.     
The JSNA and HNDA identified priorities generally remain relevant to those in the
last HCS. The ethos and principles of the Housing Sector are clearly aligned with
that of the HSCP. With a strong focus on preventative policies; home and person-
centered services; a holistic approach to strategic planning; a fundamental
commitment to reducing and eradicating inequalities; and pursuing efficiency and
cost effectiveness.
The Chief Medical Officer for Scotland 2022/23 report
‘Realistic Medicine: Doing the right thing’ highlighted
that health and social care accounts for only 20% of
what determines health. Social and economic factors
account for 40%, the environment (including housing)
accounts for 10% and health behaviours 30%. 
Although the image has been simplified for illustration
purposes, the main message is that health and care
services alone are not the solution to reducing health
inequalities. In essence, everything we do can impact
on health inequalities and help to prevent ill health
and suitable housing has a key role.   
Scotland’s Population Health Framework published in
2025 is based on five key interconnected prevention
drivers of health and wellbeing - Prevention Focused
System; Social and Economic Factors; Places and
Communities; Enabling Healthy Living and Equitable
Access to Health and Care. The Framework sets out
initial actions across these drivers and identifies two
initial evidence-based priorities – embedding
prevention in our systems and improving healthy
weight. 
Equipment & Adaptations - Scheme of Assistance 
The provision of equipment and adaptations are an essential component of an
integrated health & social care service to support individuals to live in their own
homes as independently for as long as possible.  The type of adaptations that can be
undertaken to properties varies from minor to major and can include items such as
installation of safety rails; non-slip/tactile surfaces; alterations to doors, electrics, or
plumbing; external paths, steps, paving; door access; stair lifts/hoists; and accessible
showers/baths. This helps facilitate improved quality of life and can have positive
impacts on mental health and well-being, as well as being a cost-effective model of
housing intervention.

Page 29

29 
The Scottish Government published revised guidance for the provision of equipment
and adaptations in March 2022.  The key principles and aims of the new guidance,
which includes, among others: Early intervention with full exploration of rehousing
opportunities; Better planning for the delivery of barrier-free housing and an inclusive
design / living approach; and Equity in the system, applying a “tenure neutral””
approach (as far as practicable).   
Our Scheme of Assistance was reviewed during 2023/24 reflecting the new guidance
to facilitate improvements for those who require home adaptations to live as
independently as possible. The revised Scheme of Assistance was approved by
Council in April 2025.      
Private Adaptations
During 2024/25 the Council’s Scheme of Assistance supported 80 private owners to
undertake adaptations to their homes with support of £619k Private Sector Housing
Grant (PSHG).  Care & Repair can support private owners with the adaptation
process. 
RSL Adaptations
Our Registered Social Landlord partners undertook approx. 393 adaptations to 267
of their properties in 2024/25 with around £437k of Stage 3 grant funding from
Scottish Government to support independent living.   
6.3 LHS OUTCOME THREE: GYPSY/TRAVELLERS 
Whilst the Council have the strategic obligation to assess the Housing Needs and
Demands of Gypsy/Travellers; the two official Gypsy/Traveller sites in Argyll and
Bute at Duncholgan, Lochgilphead and Bayview, Ledaig that are owned and
managed by ACHA, who are the only Registered Social Landlord in Scotland
operating sites.    
• Dunchologan – There are 7 pitches on the site.  At the end of financial year
2024/25 all 7 pitches were occupied.  
• Bayview –There are 4 pitches on the site.  At the end of 2024/25 all 4 pitches
were occupied.    
Gypsy/ Traveller Site Improvement Works
There are significant improvement works required to both sites. ACHA engaged
Architects who have worked with the community to develop design proposals for
improving the accommodation, facilities, and layouts of both the sites. 
Due to changes in Affordable Housing Supply funding, the redevelopment of both
sites is included in the Strategic Housing Investment Plan (SHIP) programme for
2026/27. ACHA will continue to engage with the community and keep them updated
on the proposals and timescales for the improvement works required.

Page 30

30 
Gypsy/Traveller Working Group - The Gypsy/Traveller Working Group (GTWG),
established in 2022, has continued to bring together key partners to collectively
engage with the community and work with them to deliver community priorities and
improvements.  The core membership includes representation from the key strategic
partners involved in delivering accommodation, health, education, advocacy, and
community safety, as well as community representation, which is central to the
effectiveness of the group. 
MECOPP (Minority Ethnic Carers of People Project) - continue to support
Gypsy/Traveller community in Argyll and Bute and help facilitate on-going
engagement. This dedicated resource has helped to encourage and improve
partnership working and participation in the Working Group. 
6.4 LHS OUTCOME THREE - EQUALITIES MONITORING 
The Housing Service ensure that all households approaching the Council for housing
advice are treated fairly, with dignity and respect. We have implemented an
enhanced equalities monitoring & evaluation framework for our key functions. 
As well as a full Equalities and Socio-Economic Impact Assessment, the Council has
carried out impact assessments for the LHS in respect of Human Rights, Children’s
Rights and Wellbeing, Island and Rural Communities, as well as a Health Impact
Assessment. A copy of these is available on the council website:
localhousingstrategy@argyll-bute.gov.uk  
Our statistics are regularly analysed to identify any emerging trends, where these are
identified then service improvements will be brought in to ensure that households are
provided with the service that meets their needs and that equalities and human rights
legislation requirements are being met. 
There will be positive impacts on service users through this additional analysis as it
will help Housing Services better understand the needs of households. Equalities
data monitoring is reported annually to Housing Management Team, the Strategic
Housing Forum partnership, the Scottish Government, and Scottish Housing
Regulator.  
In relation to Homelessness Equalities Monitoring, the Housing Services produce a
quarterly report on the following information: - 
• The number of males presenting as homeless
• The number of females presenting as homeless
• The number of households with children presenting as homeless
• The ethnic origin of all households presenting as homeless
• The number of households presenting as homeless as a result of domestic
abuse

Page 31

31 
• The number of households who stated that they slept rough the night before
making a homeless application
• The number of households who stated that they slept rough within three months
of making a homeless application
• All households who identified that they had at least one support need when
they made a homeless application 
7. LHS OUTCOME FOUR: HOUSING OPTIONS, INFORMATION &      
SUPPORT 
The LHS strategic aim four is: To provide effective and timeous information,
advice and support to help persons in housing need to make informed choices
and decisions on the range of Housing Options available. The associated
strategic objectives are to:-

Page 32

32 
7.1  LHS OUTCOME FOUR: HOMELESSNESS CONTEXT 
Many households are threatened with or facing homelessness.  Shelter Scotland
estimate that every 16 minutes a household becomes homeless in Scotland.    
The Argyll and Bute Homeless Service staff provide vital support, information and
advice to households who have nowhere to live, are worried about losing their home,
or need advice on their housing options. Our priority is to try and help people stay in
their home, and where this is not practically possible staff will assist households to
find alternative accommodation including provision of temporary accommodation
when required. 
During 2024/25 the Housing Service received 459 homeless applications in Argyll
and Bute which is a 7% reduction from 492 applications in the previous financial
year. Homelessness can affect everyone and the type of households requiring
assistance during 2024/25 varied. Table 7.0 shows breakdown of household types.
Presentations from single households account for 60% of cases and 25% of
homeless presentations last year involved children. 
The main reasons for presenting as Homeless in 2024/25 remained consistent with
the previous year.  ‘Non-violent dispute in household/relationship breakdown’ (29%)
and being ‘asked to leave current accommodation’ (18%) remain the two most
prominent reasons for homelessness in Argyll and Bute. However there has been an
increase in households presenting due to ‘other actions taken by landlord resulting in
termination of the tenancy’ (11.6% increase) compared to 2023/24.  See Chart 7.3
for further reasons for homelessness in Argyll and Bute. 
As of 31st March 2025, there were 123 households in temporary accommodation,
including 29 households with children or pregnant women.  Of these 123 households
– 5 were in B&B accommodation and all 5 households were breaching the
Unsuitable Accommodation Order.   
The average time for homeless applicants to be rehoused has increased, on average
it takes nearly 35 weeks to be offered permanent accommodation.  These statistics
highlight the urgent need for more affordable housing across the area. 
TABLE 7.0: HOMELESS PRESENTATIONS BY HOUSEHOLD TYPE 2020/21 – 2024/25
Homeless Presentations by
Household Type 2020/21 2021/22 2022/23 2023/24 2024/25
Single Person 257 253 303 322 275
Single Parent 104 66 98 88 79
Couple 31 37 57 34 25
Couple with Children  16 32 45 35 37
Other 6 1 9 13 43
Other with Children 1 9 0 0 0
All 415 398 512 492 459

Page 33

33 
CHART 7.1: HOMELESS PRESENTATIONS BY AREA 2023/24 & 2024/25 
TABLE 7.2: AVERAGE TIME FOR HOMELESS CASES TO BE REHOUSED BY RSL
Homeless Case Durations 2021/22 2022/23 2023/24 2024/25
Average time to discharge duty
(weeks) 38 33 31 35 
CHART 7.3: REASONS FOR PRESENTING AS HOMELESS 2024/25 & 2023/24 
41
106 87
15
47 72
121
1 328
98 106
28 39
67 85
1 6
0
50
100
150
Homeless Applications
1st April - 31st March
2023/24 2024/25
11
140
18
10
31
88
24
60
8
25
13
3
1
29
32
9
132
6
7
25
83
21
67
3
22
18
1
4
27
34
0 20 40 60 80 100 120 140 160
1. Termination of tenancy/mortgage due to rent…
10. Dispute with household/relationship breakdown:…
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving accommodation/household
2. Other action by landlord resulting in the termination…
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/care/other institution
6. Emergency (fire,flood,storm,closing order from…
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Reasons for Homelessness
2024/25 2023/24

Page 34

34 
Table 7.4: Number of Homeless Cases waiting for permanent housing as of June 2025 
Area 1 bed 2 bed 3 bed 4 bed 5+ bed Total
Bute 1     1
Coll & Tiree 2     2
Cowal 26 6 4 3  39
H&L 44 16 10 2 1 73
I, J, C 9  1   10
Kintyre 5 1 3   9
Lorn 46 8 2 1  57
Mid Argyll 16 3 3 1 1 24
Mull & Iona 1 1 1   3
Total 150 35 24 7 2 218 
7.2 LHS OUTCOME FOUR: HOUSING OPTIONS, INFORMATION &
SUPPORT 
Homeless Prevention and Advice – Prevent 1
All local authorities have a statutory duty under the Housing (Scotland) Act 2001 to
provide advice and assistance on housing options to try and prevent and alleviate
homelessness. 
The Housing Service had 863 ‘Prevention and Advice’ cases in 2024/25 which is an
18% decrease from the previous year. The majority were in relation to households
seeking advice in respect of ‘General Housing Advice (278). Of the 863 cases, only
174 went on to make a homeless application which is the lowest since peak of 409
cases in 2017/18, this highlights the pro-active approach to homeless prevention and
the importance of households receiving appropriate advice and assistance at an
early stage. 
Rapid Rehousing Transition Plan (RRTP) / Housing First 
The initial Rapid Rehousing Transition Plan (RRTP) 2019 – 2024 was agreed by the
Council in 2018.  Funding from the Scottish Government has been allocated on an
annual basis.  The Council was allocated £100,000 for Rapid Rehousing in the year
2024/25. Funding has since been extended for 2025/26. 
There are 6 key work streams within the Rapid Rehousing Transition Plan: 
Rent Arrears Prevention Funding – assists households who are at risk of
homelessness due to rent arrears. Payments are made direct to the landlord to
prevent eviction action. Signposting to appropriate support services and Welfare
Rights Team is offered to enable the household to sustain their tenancy.  £35,665
has assisted 34 households to remain in their tenancies during the period
01/04/2024 to 31/03/2025.

Page 35

35 
Mental Health Addictions Practitioner – is engaging with Housing First cases and
some of the more complex cases across Argyll and Bute.  There have been 35
referrals to the practitioner in 2024-25, and signposting has also been provided for
several other individuals/households which is not included in the total. 
Decoration Project – many homeless households are on low incomes and often
cannot afford to decorate their properties or bring them up to standard.  This funding
enables individuals to improve their properties in the hope of them taking ownership
of the property, viewing it as their home and increasing the likelihood of them
sustaining tenancies.  £2,549 has been paid during 2024/25.   
Housing First – is delivered within the overall RRTP and aims to give the most
chaotic and vulnerable homeless households housing.  Appropriate support is
provided to ensure tenancy sustainment and achieve positive outcomes.  Since
Housing First commenced, there have been 14 Housing First cases.  Four are
currently archived with 2 of the tenants still in their tenancies.  The other two failed to
keep in touch with agencies. 
There are currently 10 active Housing First cases. Of these, 7 have live housing
association tenancies: 2 in Lorn, 2 in Lomond, 2 in Kintyre and 1 in Mid Argyll. In
addition, there are 3 cases in temporary accommodation, 2 cases have been
allocated tenancies and are just waiting to move in (1 in Oban and 1 in Dunoon) and
the other waiting on an offer of housing in Helensburgh.  Out of the 7 live housing
association tenancies, 1 tenant is currently in prison. 
£1,120 has been paid in 2024/25 to provide white goods and furnishings to Housing
First tenants.   
Flexible Emergency Fund – provides monies to contracted housing support
providers to assist households at the point of crisis.  £1,000 has been paid during the
period 01/04/2024 to 31/03/2025. 
Starter Packs – provides funding to local organisations that supply household
starter packs to people presenting as homeless. The packs contain various essential
items e.g. bedding, kettles, cutlery, crockery and toiletries.  £1,000 has been paid
during the period 01/04/2024 to 31/03/2025. 
Table 7.5: Rapid Rehousing Transition Plan Spend 2019-2025
Work Streams Spend No of Households Assisted
Rent Arrears Prevention £406,334 330
Mental Health Addictions
Practitioner
£114,306 35
Decoration Project £82,733 113
Housing First £30,839 14
Flexible Emergency Fund £23,500 
Starter Packs £6,000 
Total £663,712 492

Page 36

36 
Section 11 Notices
The Homelessness etc (Scotland) Act 2003 places an obligation on social and
private landlords, as well as creditors to inform the local authority where they plan to
evict a tenant by raising proceedings for possession of the property or serve certain
notices relating to the standard security.  The key purpose of Section 11 Notice is to
give Local Authorities advance notification of households who may be at risk of
homelessness so they can engage with the household to try and prevent them from
becoming homeless. The number of Section 11 Notices received by Housing Service
since 2020/21, has fluctuated and were impacted by the temporary ban on evictions
imposed by Scottish Government which ended in March 2023 (exceptions in place
for serious anti-social behaviour and domestic abuse).   
There has been significant increase in number Section 11 Notices being received
since 2023/24 which is being monitored, with homeless staff continuing to pro-
actively engage with households affected. 
Table 7.6: Section 11 Notices Received 2021/22 – 2024/25 
Source of Referral
Year Private
Landlord RSL Creditors - including Banks
and Building Societies Total
2021/22 4 16 26 46
2022/23 4 5 12 21
2023/24 12 87 52 151
2024/25 19 103 88 210 
Homelessness Prevention – Housing (Scotland) Bill 
The new Housing (Scotland) Bill, legislation was published in March 2024 and
focuses on several topics that affect homelessness.  The Bill includes a new ‘ask
and act’ duty for a range of public bodies requiring them to ask about a person's
housing situation and take specific actions to reduce the risk of homelessness, this
will include health and social care, Police, children’s services, social landlords, and
the criminal justice sector. The Bill sets out a framework for the new homelessness
prevention duty with further details to be introduced in secondary legislation or
regulations/guidance following further consultation and scrutiny by the Sottish
Parliament. This is now at Stage 3, MSPs can still propose further amendments
(changes) to the Bill. There will then be a debate on whether to pass the Bill, if the
Bill is not passed, it ‘falls’ and won’t become law. 
The Housing Service works closely with partners and will continue to engage as the
new Bill and associated policy develops to ensure that a co-ordinated approach to
implementation of duties between partners is achieved.

Page 37

37 
7.3 LHS OUTCOME FOUR: HOUSING SUPPORT 
Tenancy Support
The Council’s Housing Service is committed to preventing homelessness and
helping people to stay in their own homes. 
Housing support helps vulnerable people or those at risk of losing their homes, with
support tailored to meet the specific needs of the individual. The Housing Support
Service aims to: assist people to sustain their tenancies and prevent homelessness;
support homeless clients to prepare for the allocation of a permanent home; provide
quality services and work with internal and external partners to ensure Best Value;
and promote independent living. 
Due to the high demand for support, the ‘Prioritisation of Need Framework’ is used to
prioritise those who are homeless or threatened with homelessness for support. 
During 2024/25 there were 266 new referrals received and 221 were onward
referrals. The 45 cases who were not referred included cases where the person
referred did not wish an onward referral, chose to use drop-in service, were not
resident in Argyll & Bute, did not respond to telephone calls/email/letter, due to hours
being at capacity and being Priority 4 and/or other support services in place for
example Social Work. 
At the end of March 2025 there were 196 households in receipt of tenancy support,
42 (21%) households were statutory homeless. There were 214 departures from
support during 2024/25 - 151 (70.5%) were planned departures and 63 unplanned
departures (29.5%). 
Domestic Abuse / Women’s Aid 
Argyll and Bute Council are one of over 400 Organisations who have signed up to
the ‘Make a Stand pledge’ which was developed by the Chartered Institute of
Housing in partnership with Women’s Aid and the Domestic Abuse Housing Alliance.
The pledge was created to encourage housing organisations to make a commitment
to support people experiencing domestic abuse. 
The Council’s Housing staff work closely with Women’s Aid who are the lead
organisation in Scotland working towards the prevention of domestic abuse.
Women’s Aid play a vital role coordinating, influencing and campaigning for effective
responses to domestic abuse and supporting those subjected to domestic abuse. 
During 2024/25 Women’s Aid received 228 referrals for support in Argyll and Bute.
This is significant increase as there were only 30 referrals received last year.

Page 38

38 
8. LOCAL HOUSING STRATEGY PROGRESS 2024/25 & HOUSING EMERGENCY ACTION PLAN 
The annual progress in 2024/25 against each of the four outcomes has been collated in Action Plan table below.  Reference to the
links to Housing Emergency Plan at Appendix 1 has been added to each of the indicators. 
LHS OUTCOME ONE – HOUSING SUPPLY AND PLACEMAKING PROGRESS 2024/25
RELEVANT INDICATORS       BASELINE 2024/25 ANNUAL & ASSESSMENT / COMMENT ON         
HISTORIC   5 YEAR PROGRESS         
TREND    TARGET
1.1
Number of new house building completions (all tenure) 
Links to HE Action 1.1, 1.2, 1.5, 1.6, 2.1, 2.3
2020/21: 228
2021/22: 275
2022/23: 340
2023/24: 144
78
290 per
annum
(1,450)
New build figures + SHIP affordable
housing supply figures
1.2 Number of new private market homes completed
Links to HE Actions 1.1; 1.4; 1.6; 1.7
2020/21: 172
2021/22: 156
2022/23: 152
2023/24: 74
34
75 per
annum
(375)
New build sales figures 
1.3
Number of new affordable RSL homes completed.
Baseline/ Historic Trend data from Scottish Government Housing
Statistics & Planning estimates; “2021/22” figure sourced from
Council Planning records & SHIP monitoring data
Links to HE Action 2.1, 2.4, 2.6, 2.9
2020/21: 56
2021/22: 119
(146 ABC Housing
Stats) 
2022/23: 180
2023/24: 70
44
215 per
annum 
(1,075) 
63% of previous year figure and is
short of the ambitious 215 target. 
(Council / SHIP figures vary due to
differences in reporting systems)  
1.4
Total Investment in completed SHIP projects (value of
projects completed in year NOT actual spend in that year for
ongoing work) 
*2021/22 - (+c.£24m for  Dunbeg units)
Links to HE Action 2.4, 2.9
2020/21:
£6.767m
2021/22:
£4.522m 
2022/23:
£6.173m
2023/24:
£15.122m
£9.831m
Maximise
RPA, SHF, &
RSL funding
above
baseline
Nearly £10m to support projects in
Islay, Lorn, Helensburgh and
Lochgilphead.

Page 39

39 
1.5 
5 year effective housing land supply (unit capacity) /
Local Housing Land Requirement (LHLR) 
Links to HE Action Plan 1.2, 1.5, 1.8, 2.2, 2.4, 2.5,
3.5, 4.9
2021: 2,889 
2022: 2,684
2023: 2,591
2024: 3,010
2,892
4372 
(10 year
target)
LDP2 identifies a LHLR of 3000
units between 2020 and 2030, this
number being reduced by an agreed
percentage to account for years
already elapsed. Thus the figure
shown is the remained of the 10
year LHLR, supplemented by
approved and expected windfall
sites. Additional capacity also
available within National Park area
of Argyll & Bute. 
1.6  Number of alternative/intermediate tenure homes
completed via the SHIP (% of total completions)
Links to H Action Plan 2.4, 2.8, 2.9, 3.1, 3.3, 3.4
2020/21:4
(8%)
2021/22: 2
(1%)
2022/23: 24
(13%)
2023/24:16
(23%)
6
(14%)
(10-15% of
total 
completion
s)
Target met with 6 New Supply
Shared Equity (NSSE).
1.7
Number of households housed through Common
Housing Register (CHR) / RSL tenancies created 
Links to HE Action Plan 2.9, 4.4
2020/21: 631
2021/22: 733
2022/23: 811
(951)
2023/24: 763 
663 
860 per
annum 
(4,300)
Other RSL Lets would raise total to
738 last year, which is still below
target. (Trust-14, Link- 21, Bield 40)
1.8  Nos. of empty homes brought back into use (all cases
involving Empty Homes Officer)
Links to HE Action Plan 1.6, 2.4, 4.1 4.2, 4.10
2020/21: 29
2021/22: 38
2022/23: 41
2023/24: 31
(+2 HSCP)
42
(7+HSCP)
30 per
annum
(150)
In addition to the cases where the
Empty Homes officer has supported
owners to bring properties back into
use. The HSCP Empty Homes
Project Officer has also brought 7
empty homes into use for workers.

Page 40

40 
LHS OUTCOME TWO – ENERGY EFFICIENCY, CLIMATE CHANGE AND POVERTY PROGRESS 2024/25
RELEVANT INDICATORS       BASELINE 2024/25 ANNUAL & ASSESSMENT / COMMENT 
HISTORIC   5 YEAR ON PROGRESS         
TREND   TARGET
2.1 
Number of properties improved with energy efficiency
measures & total grant investment via the Energy
Efficiency Scotland: Area Based Scheme (operates on
July-June timeframe) 
2020/21: 237
& £1.496m
2021/22: 105
& £560,511
2022/23: 288
& £2.312m
2023/24: 361
& £2.492m 
281 &
£2,179m 
280 homes
pa
(1,400
homes
& at least
£4.875m)
2023/24 stats updated. 
2024/25 - ABS12 ended with a full
year spend and 100% customer
feedback when surveyed about their
experience with ABS.  Works to 281
properties with 342 measures
installed to value of £2,179,827. 
2.2 
Nos of households receiving advice & assistance on
house condition/ energy improvement and/or home
safety works via referrals 
*Home Energy Scotland (HES) data 
Links to HE Action 4.6
2020/21: 2,901 
2021/22: 2,120 
2022/23: 2,554 
2023/24: 2,245
1,786 
2,000
cases
completed
pa
(10,000
closed by
2027)
HES – 1,786 referrals to range of
schemes/partners; 2,992 household
interactions; 954 Warmer Homes
measures installed.
In addition, ALIenergy – 873 clients
registered in year.
2.3 Annual Household Income Generated by Council’s
Welfare Rights Service
2020/21:
£3.364m
2021/22:
£2.736m
2022/23:
£4.3m
2023/24:
£4.458m
£5.444m  £2.75m
(£13.75m)
Effective support services continued
to be delivered; resulting in
successful generation of
income/benefits for vulnerable
households, which was 98% more
than target of £2.75m. 
In addition, CAB secured £2.051m
for clients. This takes the annual
total to over £7.495m.

Page 41

41 
2.4
Progress on approving & implementing the Scheme of
Assistance (SoA),  incorporating strategy for homes
failing Below Tolerable Standard (BTS)  & policy on
Compulsory Purchase Orders (CPOs)
Previous SoA
approved 2016
Review started 
New SoA
approved
April 2025 
SoA to be
approved &
implemented 
New Scheme of Assistance
incorporating policy on CPO and
BTS approved.
2.5 % of RSL properties achieving Energy Efficiency
Standard for Social Housing (EESSH1) compliance
2020/21: 88%
2021/22:
87.6%
2022/23:
92.4%
2023/24:
87.8%
93.32% 
Compliance
by 2032 for
EESSH2
target.
Average for ACHA, DHA, FH,
WHHA, Trust & LINK Group. (no
data for Bield, Key, Cairn or
Blackwood) 
2.6 Nos of private properties improved with PSHG aid, or
assistance from ABC Housing Improvement Officers
2020/21:43 -
£89,515
2021/22: 19 -
£48,614
2022/23: 22 -
£400,671
2023/24: 50 -
£150,128 
53 grants
£325k 
(400
properties
& grant
spend of
£2m)
53 repair & improvement grants
totalling £325k

Page 42

42 
LHS OUTCOME THREE: SPECIALIST PROVISION AND INDEPENDENT LIVING PROGRESS 2024/25
RELEVANT INDICATORS       BASELINE 2024/25 ANNUAL & ASSESSMENT / COMMENT 
HISTORIC   5 YEAR ON PROGRESS         
TREND   TARGET
3.1 
Housing Contribution Statement (HCS) revised &
approved for inclusion in HSCP Strategic Plan; Housing
OT post established as permanent and Action Plan
reviewed and agreed. 
Links to HE Action 4.2
2020/21: OT
post piloted
2021/22: OT
post made
permanent
2022/23:
Revised HCS
2023/24: OT
Post & HCS
review
New HCS
approved  
HCS/OT
Action Plan
fully
delivered
by 2027
Housing OT established joint area
partnership groups with RSLs;
implemented review of waiting lists;
improved assessment procedures &
data collation/case monitoring; early
engagement in new build design and
allocations for SHIP projects.
3.2 
Number of RSL and Private Homes adapted with grant
assistance; and Total grant (all tenures) 
Links to HE Action 4.6
2020/21: 309
£1.15m
2021/22: 319
£1.146m
2022/23: 305
£925k
2023/24: 302
£1m+ 
347 
£1.06m 
c 350 pa 
(1,750 with
£5.5m
grant by
2027)
Scottish Government enabled 393
adaptations in 267 RSL properties
with £436,790* Stage 3 grant
funding. *Excludes funds not yet
drawn down. The Council’s PSHG
supported adaptations to 80
properties with £625k Grant. 
3.3 Nos of telecare unit installations & total clients in receipt
of Technology Enabled Care (TEC) service at year end.
2021/22:
1,774 installs
& 1,994 clients
as of March
2022
2022/23: 
2,056 clients
Installs: n/a
2155 active
clients &
841
Installs 
By 2027,
4,500
clients to
have 5,700
installs;
and over
2,000
active
clients.
During 2024/25 the TEC team
supported 2,155 active clients
(2,792 unique clients had telecare
service during the year) with
installation of 841 installs to assist
them to remain safely at home.
Previous years install figures may
have included removals, fault

Page 43

43 
2023/24: 2,074
clients & 2,248
installs
checks, and fitting of additional
equipment.
3.4  Nos & % of specialist subsidised new builds completed
via SHIP
Links to HE Action 4.6
2020/21: 1
2021/22: 22
2022/23: 36
2023/24: 19 
12 units
27.3% 
5% of SHIP
new builds
are
wheelchair
units & 5%
are other
specialist 
27% of annual SHIP total, including 2
wheelchair adapted units (5%) and
10 amenity/older person units (23%).  
3.5 Improvements to official Gypsy/Traveller sites &
satisfaction levels
2020/21: 
No survey 
2021/22: No
survey 
2022/23: 75%
2023/24: 43%
No survey 100%
satisfaction
ACHA did not undertake satisfaction
survey last year.  The GTWG
continues to engage with partners
and community to address current
site conditions and to take
improvements forward.
3.6
Enhanced Equalities monitoring & evaluation framework
established and annual reports produced 
2020/21:
HNDA
published
Data and
indicators
reviewed 
Annual
Report for
all Housing
functions
Range of LHS Impact Assessments
published online. Enhanced 
Equalities homelessness reporting
implemented 2022/23. 
LHS OUTCOME FOUR: HOUSING OPTIONS, INFORMATION & SUPPORT PROGRESS 2024/25
RELEVANT INDICATORS       BASELINE 2024/25 ANNUAL & ASSESSMENT / COMMENT 
HISTORIC   5 YEAR ON PROGRESS         
TREND   TARGET
4.1
Protocols for persons leaving an institutional setting
including hospital discharge, looked-after children,
armed forces, prison, or evictions 
Looked after
Children
Protocols in
place; Armed
Existing
protocols for
Looked After
Children,
Prison
Protocols
drafted &
consultation
carried out
by 2023.
Review / work on protocols for
hospital discharge

Page 44

44 
Services
Covenant.
discharge, &
Section 11 
Protocols
agreed & in
place by
2024
4.2
Housing sector enables an effective response to
meeting the needs of those experiencing domestic
abuse
2020/21: 128
CHR
applicants
35 Homeless 
2021/22: 100
CHR
applicants
25 Homeless 
2022/23: 104
CHR
28 Homeless
2023/24: 61
CHR 32
Homeless
57 - CHR 
34 -Homeless
cases 
Homeless
& CHR
applicants
due to
Domestic
Abuse
reduced
below
baseline.
The number of Common Housing
Register (CHR) applicants “being
abused by someone in household”
has reduced. However, Homeless
cases due to domestic abuse have
increased on previous year’s figure.
4.3 Rural Housing First Initiative in Argyll and Bute –
number of tenancies created
Protocols
agreed with
RSLs
2021/22 = 1
2022/23 = 6
2023/24 = 7 
One 
10
tenancies
pa (50 by
2027)
The initiative was developed in
2021/22. 
There was one new Housing First
case in 2024/25.   
4.4
Rough Sleeping presenting as Homeless
(based on HL1 statistics: as reported at Homeless case
interviews)
2020/21: 6%
slept rough night
before & 10%
within previous
3 months
2021/22: 4%
slept rough night
4% slept
rough night
before &
3.75% within
3 months 
Incidence
reduced
below
baseline/
Scottish
Average
Based on information provided by
households presenting as homeless,
4% of homeless cases slept rough
the night before presenting (18 out
of 459); while 31 slept rough within 3
months previously (6.75% of total

Page 45

45 
before & 7% 
within 3 months
2022/23: 5%
slept rough night
before & 7%
within 3 months
2023/24: 7%
slept rough
night before &
11% within 3
months
cases). This is positive reduction
from 2023/24. 
4.5
HL1 presentations from Prison securing positive
housing outcomes (supporting Community Justice
agenda)
2020/21 – 2 of
4 cases (50%)
2021/22 – 12
of 16 cases
(81%)
2022/23: 5 of
11 cases
(45%)
2023/24: 3 of 5
cases (60%)
4 out 6
(67%) 
Levels
sustained
at or above
baseline
i.e. >50%
6 cases closed - 1 moved to RSL
tenancy, 1 secured private
accommodation, and 2 made own
arrangements which is above the
baseline of 50%
4.6
% of Housing Support services departures (clients
leaving support) which are planned departures per
annum
2020/21: 70%
2021/22: 76%
2022/23: 65%
2023/24: 78%
70.5%  80% 
151 of 214 closed cases were
planned departures which is below
baseline.                        
4.7
Nos of households supported via Housing First with
support of dedicated Mental Health /Addictions Housing
Practitioner.
New Initiative
2021/22- Post
established –
25 
2022/23: 56 
2023/24: 55
35 referrals
50
assessments
to be
completed
35 referrals, which is below
baseline.  The practitioner also
signposted several other individuals
to further advice/support/services,
but this is not included in the total.

Page 46

46 
4.8 Temporary Accommodation provision with protocols to
address emergency needs
2021: 108
units 
2022: 121
units
2023: 122
units
2024: 123
units
125 units 
100%
applicants
in need
receive
suitable
offer of T.A.
Core provision of 125 units
(including serviced accommodation)
as of March 2025.
4.9
Level of Homeless presentations and average time to
rehouse homeless applicants in an RSL property. 
Links to HE Action 2.9
2020/21: 416
applicants; 39
weeks 
2021/22: 398
applicants; 34
weeks 
2022/23: 512
applicants; 33
weeks 
2023/24: 492
applicants, 31
weeks
459
applicants 
35 weeks 
Cases at or
below
baseline
(416). 26
weeks on
average to
rehouse in
RSL sector
Homeless applicants reduced
slightly on previous year 
Average time to rehouse homeless
cases was 34.6 weeks, which has,
increased and is over 8 weeks
longer than target of 26 weeks.
4.10 Develop a Housing Communication Plan and social
media strategy
Enhanced
Housing
Options
module
established
Complete
Plan to be
implemented
in 2023 
Communication Plan approved April
2024.

Page 47

47 
Appendix 1 – Housing Emergency Action Plan approved 2024
As detailed in the Housing Emergency Section, in collaboration with strategic partners, a Housing Emergency Action was developed
following pre-engagement activities and option appraisal sessions held as part of the Housing Summit. These actions have been
interlinked and will be incorporated into the next Local Housing Strategy. Progress on Year 1 – 2024/25 is reported in following table. 
Housing Emergency Priority 1: Enable the Delivery of More Market Homes in Argyll & Bute  
ACTION POINT   PROGRESS       PRIORITY  LEAD             DELIVERY               
YEAR PARTNERS PARTNERS                
1-5
1.1 Implement a more flexible
approach to infrastructure, roads
and design requirements on
development sites.
Links to LHS outcome 1.1, 1.2,
1.3
New Roads Guideline / Almost complete 
2024/25: Complete / will be monitored 
Yr 1 A&BC 
1.2 Increase capacity within Council
services key to housing
development including Planning,
Roads and Building Standards. 
Links to LHS outcome 1.1, 1.5
DM has increased capacity over recent months. 
New roads staff in place.  Building Standards Fees
increase over a 3 year period will improve
resources. Monitoring performance.  Scottish Govt.
Resourcing Planning System Review is currently
underway. Project officer to support Housing Group
& improved internal communications has been
agreed and recruited.
2024/25: Complete / Capacity will be monitored 
Yr 1 /
monitor
A&BC Scottish
Government

Page 48

48 
1.3 Dramatically increase the number
of college places for construction
skills development in Argyll &
Bute.
Need to establish baseline, existing numbers,
evidencing the need, scoping of options/
identification of target or direction.
2024/25: To be taken forward
1-3Yrs A&BC   UHI / Construction
Industry /
Developers /
Colleges / A&BC
Education
1.4 Create an empowered
Construction Forum bringing
together all planning consultees
to speed up decision making. 
Links to LHS Outcome 1.2
Current communication channels exists between all
statutory consultees & Key Agencies involved in
the planning process both at Planning application
stage, and during LDP production.  Increased
resources (see 1.2) will assist communication. 
Monitor improvement and evaluate in year 3.  
2024/25: To be taken forward.  
Yr 3. A&BC 
1.5 Develop funding and risk sharing
models to enable infrastructure
investment in housing sites. 
Links to LHS Outcome 1.1, 1.5
The Council is working with Scottish Futures Trust
(SFT) and HubNorth who are already looking at
this issue. 
2024/25: Opportunities continue to be explored by
The Highlands and Islands Regional Economic
Partnership (HI-REP) and Scottish National
Investment Bank (SNIB) with SFT involvement.
Small scale of opportunities in A&BC limiting factor
but continue to engage with progress. 
Ongoing A&BC Scottish Futures
Trust, HubNorth

Page 49

49 
1.6 Repurpose vacant
spaces/derelict buildings to
deliver homes for sale or rent
(see 4.2)
Links to LHS Outcome 1.1, 1.2,
1.8
An additional Empty Homes Officer appointed with
HSCP.
NDR & Development and Economic Growth Teams
developing repurposing with NDR.  
2024/25: 2 x Empty Homes Officer posts with
Housing and Empty Business Property Officer
appointed to work with commercial unit owners
Yr1 A&BC Private landowners
1.7 Use rural housing burdens and
RGD/Partnership Support for
Regeneration Funding (PSRF)
enabling developers to offer
principal homes at a fixed price
Links to LHS Outcome 1.2
Rural Growth Deal Pilot will explore this delivery
model.  Outline Business Case already submitted. 
A&BC acts as developer in the pilot which will then
be reviewed. A&BC seek to influence More Homes
for review of PSRF 
2024/25: RGD works progressing 
Yr3 ABC SG / UK
Government / SFT
1.8 Create supplementary planning
guidance to bring forward sites
for speculative building that are
not a housing allocation in the
current LDP, making it easier for
developers to take forward
Links to LHS Outcome 1.5
Feb 2024 LDP2 adoption allows consideration of
development on a wider geographical area than
previously. LDP3 work / OSDF / HSDF will seek to
identify new development land. 
2024/25: On-going 
Yr 1 (re
LDP2) &
Yr3
ABC

Page 50

50 
Housing Emergency Priority 2: Enable the Delivery of More Affordable Homes in Argyll & Bute
ACTION POINT    PROGRESS        PRIORITY    LEAD  DELIVERY               
YEAR PARTNERS PARTNERS                
1-5
2.1 Consider the use of standard
housing design types to speed up
procurement planning approvals
and building warrant approvals.
Links to LHS Outcome 1.1, 1.2,
1.3
Primary beneficiary RSLs.  RSLs should decide if
they want it and take the lead with ABC being the
supporting partner.  Raise at Strategic Housing
Forum. 
2024/25: RSLs procured an architect to undertake
the standard suites of 7 house types for modular
use, however with the insolvency of Connect
Modular earlier in 2025, the procurement was
cancelled. Notwithstanding, ABC continue to
explore potential for modular / standard house type
construction and are in discussion with RSLs and
Community Regeneration Funding Team to take
this forward.
Yr 2/3 ABC
Housing
Forum  /
RSLs
RSLs / A&BC

Page 51

51 
2.2 Create a ring fenced
infrastructure fund for Argyll &
Bute similar to the Highland
Council model
Links to LHS Outcome 1.5
Highland Council model was a loan as part of their
Rural Growth Deal.
Alternatives: HIF applications scheduled for several
projects. Issue of RPA flexibility raised with SG &
Housing Minister. / Council funding strategic
Masterplanning will facilitate planned future
investment in strategic infrastructure.  (see 1.5).
2024/25: Opportunities continue to be explored
including Community Regeneration Partnership
(CRP) Fund
Ongoing. A&BC Scottish
Government
2.3 Improve infrastructure planning
across agencies 
Link to LHS Outcome 1.1
Seek to influence improvements.  Liaison activity
already happens prior to LDP production and
National Infrastructure Plan but doesn’t result in
appropriate investment.  Priority action.
2024/25: On going.  Engagement with SSEN to
explore opportunities in line with their infrastructure
upgrades.  Development of Oban Strategic
Development Framework (OSDF) & Helensburgh
Strategic Development Framework (HSDF),
preparation of Evidence Reports for LPP3 including
all key agency engagement.
Ongoing COSLA /
A&BC
Scottish
Government

Page 52

52 
2.4 Freedom to use Scottish
Government housing funding
more flexibly and as an allocation
with local administrative control 
Links to LHS Outcome 1.3, 1.4.
1.5, 1.6, 1.8
Raised with More Homes division and Housing
Minister. Seek to influence change.
2024/25: Housing discussions with More Homes in
relation to AHSP funding with flexibility agreed for
acquisitions.   Discussion with SG Planning and
Housing Committee. Published Committee report
references this. COSLA Housing Group work
schedule in response to Scotland’s Housing
Challenges/ Opportunities includes addressing this
point.
Ongoing A&BC /
CPP 
Scottish
Government / RSLs
/ Community
Housing Trusts
2.5 Use Rural Housing Body status to
enable land assembly, master
planning and infrastructure
investment 
Links to LHS Outcome 1.5
The following are proposed as more deliverable
actions:
A&BC have achieved Rural Housing Body Status,
will implement to secure primary occupancy and
potentially affordability in a variety of ways,
guidance will be developed to support this.
Land assembly and Masterplanning will be
considered through OSDF / HSDF and LDP3.  (see
1.8) 
See 2.2 & 2.3 for infrastructure investment. 
2024/25: On going.  Housing Delivery Group
working on number actions in relation to A&BC
owned land and sites. 
1/5yrs ABC

Page 53

53 
2.6 Develop planning policies which
tackle the housing crisis e.g.
exception policies, Affordable
Housing Policy contributions,
rural burdens 
Links to LHS Outcome 1.3
Currently reviewing and developing new
approaches to planning policy including: primary
occupancy restriction, planning control for short
term lets, include key worker definition in affordable
housing, construction worker housing strategies,
seasonal worker accommodation. 
2024/25: On-going
1-3yrs A&BC 
2.7 Create funding mechanisms for
Community Housing Trusts to
finance feasibility studies,
professional fees and approval
process
Need to explore sustainable model for Community
Housing Trusts & clarity of roles. 
2024/25: February 2025 Council approved
Strategic Housing Funding to support Community
Development Trusts with feasibility funding. 
Ongoing CPP /
Scottish
Governm
ent
HiREP / HIE /
Community Housing
Trusts
2.8 Evidence the demand for
intermediate housing to enable
an RSL development pipeline and
deliver more MMR and low-cost
homes for sale 
Links to LHS Outcome 1.6
Have engaged with LAR to explore delivery of mid-
market rent.  Evidence exists within the HNDA. 
Will seek to review understanding of that evidence
at Housing Forum, with a view to improving
dissemination.  
2024/25: Housing implemented monitoring
procedures for mid-market rent demand,  RSL
engagement with quarterly updates via SHIP
Group and delivery cost exercise being undertaken  
A&BC /
Housing
Forum

Page 54

54 
2.9 ACHA to develop a minimum of
300 new build homes of mixed
tenure and a minimum of 50 buy
backs by 2029 
Links to LHS Outcome 1.3, 1.4,
1.6, 1.7, 2.9  
2024/25: Total of 313 homes are programmed by
ACHA in the current SHIP. Total of 14 buy backs in
2024/25. 
1-5Yrs ACHA 
Housing Emergency Priority 3:  Enable the Delivery of More Homes for Argyll & Bute’s Workforce
ACTION POINT              PROGRESS        PRIORITY  LEAD             DELIVERY               
YEAR PARTNERS PARTNERS                
1-5
3.1 Deliver seasonal and
temporary workforce
accommodation using short
term occupancy agreements 
Links to LHS Outcome 1.6
Working with MICHT to deliver worker
accommodation on Mull.  (HubNorth & SFT
involved).  HIE have expressed interest in
contributing to this work.  Temp construction
worker accommodation also needs to be
tackled.  SSEN and Cruachan Conditions
Example.  SG and HIREP looking at the issue.
2024/25: RGD Mull project progressing - site
enabling works including servicing and road
complete. Progressing detail of building
construction and funding. SSEN engagement
in relation to workforce housing. 
Yr 1 &
ongoing.
ABC for
Tobermory
proposal.  
CPP re
wider
issue.
MICHT / UK
Government &
Scottish
Government
through Rural
Growth Deal),
HiREP / HIE.
3.2 Develop a strategic approach
to evidencing the need for
Already a lot of evidence/ HNDA / Consultants
Reports / MICHT survey / CPP survey.  HSCP  
ABC Public sector
agencies.

Page 55

55 
workforce housing in the public
sector
Empty Homes officer.  CPP may be able to
instigate a more formal route for monitoring live
demand and consideration to a more
collaborative approach such as sharing
accommodation.
2024/25: HI-REP RTO research published.
Depopulation Research to look at working age
needs to retain them or attract back to the area  
CPP
3.3 Deliver emergency workforce
housing options including the
use of modular, temporary and
tiny homes  
Links to LHS Outcome 1.6
Rural Growth Deal worker housing project on
Mull. HIREP work on worker housing.
Housing Strategy conditions for major projects
such as SSEN Sub-stations and Cruachan. 
Will incorporate in Planning Policy.
2024/25: On going 
Yr 2-3 ABC  
CPP
SSEN / HiREP /
HIE / DRAX
3.4 Deliver a Mid-Market Rent
workforce housing programme 
Links to LHS Outcome 1.6
LINK 18 units at Dunbeg.
LAR exploring opportunities without Govt
Finance.
2024/25: Evidence of demand being raised
with RSLs on quarterly basis  
RSLs  
LAR

Page 56

56 
3.5 Identify public sector land and
buildings which could provide
workforce housing via
repurposing and change of
use.
Links to LHS Outcome 1.5
ABC property is mapped. 
2024/25: Housing Delivery Group work stream.
/ Public Trawl notice opportunities / Empty
Homes & Property Officers identifying
opportunities    
CPP 
3.6 Use the Partnership Support
for Regeneration Fund to
enable private sector
workforce housing models
Initial analysis suggested this would not prove
attractive to developers in rural ABC.  Will seek
to influence SG / More Homes Division to
review this Fund (see 1.7) 
2024/25: On going
Ongoing
.
ABC  
3.7 Assess the potential to
reintroduce the Rural Home
Ownership Grant model for
working households in
partnership with Community
Housing Trusts  
2024/25: Scottish Government funding
mechanism.    
Community
Housing
Trusts

Page 57

57 
Housing Emergency Priority 4: Make the Best Use of Existing Homes in Argyll & Bute
ACTION POINT               PROGRESS                   PRIORITY  LEAD             DELIVERY               
YEAR PARTNERS PARTNERS                
1-5
4.1 Further reform CPO processes
to tackle abandoned homes
more effectively 
Links to LHS Outcome 1.8
Empty Homes Officers have delivered empty
property back in to use via CPO before,
currently exploring on one property to see if
interest from developer / purchaser. Not clear
what reforms are needed if any.  Input to SG
consultation.
2024/25: Housing continue to explore options
for CPO and advertised for back-to-back
partner. 
Low ABC Scottish
Government 
4.2 Create a multi-agency team
enabling mixed tenure
refurbishment and
regeneration projects  (see
1.6) 
Links to LHS Outcome 3.1
Council NDR Team developing NDR relief
scheme for empty property back in to use.
Council ‘Conservation Area Regeneration
Schemes (CARS)’ schemes.  Private Sector
Housing Grant funding to support this.
Council APAG group for dangerous property.
Work in Helensburgh Clyde Street with ACHA.
2024/25: On going
Ongoing
.
ABC 
4.3 Develop a housing model that
offers apprenticeships with
Home Argyll can discuss if they would want to
implement a local lettings policy connected to
apprenticeship.
Yr2 HOME
Argyll
Construction
Industry

Page 58

58 
tenancies to keep young
people in Argyll & Bute
2024/25: Depopulation Research outcomes
may support change to allocation policy 
4.4 Create more choice and
flexibility within the Home
Argyll policy to address
identified housing pressures
Links to LHS Outcome 1.7
Home Argyll partners amended lettings policy
to allow prioritization of identified pressures. 
2024/25: HOMEArgyll Allocations Policy
reviewed 2024/25
Yr1 HOME
Argyll
Partnership 
4.5 Increase the number of Empty
Homes Officers with more
flexibility to assemble funding
Links to LHS Outcome 1.8
New Empty Homes officer employed in
partnership with HSCP.
2024/25: Council has approved funding to
support continuation of second Empty Homes
Officer with remit of worker accommodation.
Waiting on the outcome of SG/Shelter funding.  
Yr1 ABC/
HSCP 
4.6 Develop a better range of
housing options for older
people to encourage
movement in existing housing
stock
Links to LHS Outcomes 2.2,
3.2, 3.4
Incorporate into the LHS Action Programme
and develop from there. 
2024/25: On-going.  HNDA 2026 will help
inform local needs for ageing population. 
Yr 2-3 ABC  
CPP 
4.7 Introduce STL control areas in
pressured housing market
areas
Now short term let license applications have
been received.  We can explore process of
consulting on and establishing planning control
areas.  
Yrs1-2 ABC

Page 59

59 
2024/25: Monitoring on-going to identify key
pressure areas. 
4.8 Double the Council Tax on
Second Homes
This was implemented on the 1st of April 2024.
Have bid for additional officer resource to help
support transition from second homes to long
term rental.
2024/25: Council Tax change implemented. 
Private Sector Resettlement Officer post to
support owners transition to long term rental.  
ABC  
4.9 Map public sector land and
buildings which could provide
affordable housing via
repurposing and change of
use 
Links to LHS outcome 1.5
Duplicates 3.5
2024/25: Housing Delivery Group work stream.
/ Public Trawl notice opportunities / Empty
Homes & Property Officers identifying
opportunities    
CPP 
4.10 Extend the use of rural
housing burdens across
Housing Market Areas to
maintain primary occupancy
and/or affordability
Links to LHS Outcome 1.8
Rural Housing Authority Status Achieved. 
Models to utilize this being developed.  
2024/25: On going
Yrs 1-2 ABC