Willox Park
OPTIONS APPRAISAL CONSULTATION DOCUMENT
ITEM 10 - APPENDIX 1

Page 2

Please tell us what you think:
Following recent surveys we have found a
number of problems with the homes at Willox
Park. We now need to decide on the future of
the complex.
This document sets out the options that we are
asking tenants to give us their thoughts on.
You will have 8 weeks to tell us your thoughts
and we will have drop in sessions in the
common room and will happily speak to you in
person or on the phone. 
We will then present the findings from this
consultation to elected members in the new
year in a paper and the elected members will
make the final decision.
8 weeks consultation:
closes 10th January
Dates of drop in sessions
(Willox Park Common Room):
Tuesday 28 November – 10am – 12pm
Wednesday 13 December  - 10am – 12pm
Friday 5 January  – 10am – 12pm
My contact details:
Emily Dorrian
Emily.Dorrian@west-dunbarton.gov.uk
07785656625

Page 3

Option A: maintain current status
The works will involve:
•Only works identified in existing asset plans will be done
when they reach the end of life e.g. kitchens, bathrooms,
and windows etc. 
•Repairs and maintenance to continue for occupied
homes.
•Empty homes will not be re-let because of ongoing
concerns about dampness.
Pros and cons:
•Wider complex will become less vibrant as homes slowly
become empty and contrast with new build homes
when they are built.
•Properties will continue to deteriorate due to dampness
and other defects
•The council will lose rental income but will need to
maintain and invest in less homes.
•Presented here because it is an option which offers the
least disturbance to existing tenants.

Page 4

Option B: Refurbishment
The works will involve:
•Strip back to brick internally & externally
•Apply damp proof solution to floors and walls
•Potential structural works to add second fire exit off bedroom/
improve layouts
•replace doors, windows, roofs, gutters, kitchens, bathrooms,
external wall insulation, new plastered ceilings and walls
internally, loft insulation, rewire, heating systems replaced with
heat pumps & radiators.
•Tenants would need to move out of their home and works
completed on a block by block basis.
•Works to each block will take around a year done so it will be a
multi year project.
•Existing common room would be refurbished.
Some pros and cons:
•These works are disruptive to tenants and expensive to
complete.
•Refurbishment works would not start until phase 1 new build
homes are completed.
•Only 10 to 20 year guarantee on damp proof solutions risks
problems returning.
•May find additional structural or other problems once work starts
•Homes will be much more energy efficient with new insulation.
•Homes will be different after works are completed.
•There is a risk that homes no longer meet modern building
standards for older households due to layout and we will not be
allowed to let them to this group.

Page 5

Option B: Refurbishment photos
Picture showing a room stripped back to brick internally.
Picture showing a house stripped back to brick externally,
new windows fitted and roofing works underway

Page 6

Option C: Redevelopment
The works will involve:
•Demolish the existing homes in phases
•Build new energy efficient homes, the properties will be larger
and meet modern accessibility standards for older households.
•A new common room would be built, phasing of this is to be
confirmed but a temporary solution will be found if needed.
•Tenants would move into the phase 1 new homes (care
homes site) to allow phased demolition and redevelopment.
•Exact design to be consulted on with tenants but based on
similar to phase 1 then could get a further 20-25 new homes on
the site.
Some pros and cons:
•Demolishing and redeveloping is disruptive to tenants.
•Demolition and redevelopment works would not start
until phase 1 new build homes are completed.
•Developing new homes is expensive.  However, we can
access Scottish Government grant funding towards new
homes to reduce costs for the council..
•A new common room will provide better meeting and
gathering space.
•New homes will have better layouts and will have more
energy efficient building fabric which should reduce running
costs.
•New homes would be expected to last 100+ years.

Page 7

Option C: Redevelopment photos
Artist impression of phase 1 development showing potential entrance to
new development
Artist impression showing courtyard area for
residents on phase 1 development.

Page 8

Option D: Hybrid
The works will involve:
•Demolishing some homes, keeping some of the existing homes
and building some new homes.
•This will require all the same steps which are listed in the both the
refurbishment options and in the redevelopment options.
•Common room may stay in existing location or may be able to
develop a new one.
Some pros and cons:
•Both refurbishing and demolishing/ redeveloping is disruptive to
tenants.
•Existing homes may wane in popularity in comparison to newer
ones with better layouts.
•Unknown at the moment which houses would be kept and
which would be demolished.

Page 9

Option form:
Please tell us your house number:
Please tell us which option you’d like to
choose:
You may tick or cross one option.
Option A: Maintain current status
Option B: Refurbishment
Option C: Redevelopment
Option D: Hybrid (bit of both 2&3)
Comment box:
Please use this to tell us any thoughts you have
about the future of Willox Park.

Page 10

Option form:
Please tell us your house number:
Please tell us which option you’d like to
choose:
You may tick or cross one option.
Option A: Maintain current status
Option B: Refurbishment
Option C: Redevelopment
Option D: Hybrid (bit of both 2&3)
Comment box:
Please use this to tell us any thoughts you have
about the future of Willox Park.