Appendix 1
EDUCATION
OPTIONS APPRAISAL
SOUTHEND PRIMARY SCHOOL
Appendix 5

Page 2

1.0 INTRODUCTION 
1.1  As of April 2021 there were no pupils attending Southend Primary School. 
Pupils residing within the Southend catchment area were attending schools
within the Campbeltown area. The pre-school age children within the
catchment area were also attending nursery settings in Campbeltown. There
were no Primary 1 pupils registered to attend Southend Primary School in
session 2021-22. At the Community Services Committee on 10th June 2021,
Argyll and Bute Council approved the mothballing of Southend Primary School
on a temporary basis. It was agreed that the premises be retained for 2 years
on a care and maintenance basis. 
SOUTHEND PRIMARY SCHOOL 27052021 Pre-Agenda Briefing of the
Community Services Committee.pdf (argyll-bute.gov.uk) 
On 25th August 2022, Argyll and Bute Council approved the continued
mothballing of Southend Primary School and for the Education Service to
begin gathering necessary information and carry out the exercise of assessing
the options for the future of Southend Primary School, in accordance with the
preliminary requirements of the Schools (Consultation)(Scotland) Act 2010. 
SCHOOLS CONSULTATIONSCOTLAND ACT 2010 - SOUTHEND PRIMARY
SCHOOL.pdf (argyll-bute.gov.uk) 
The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young
People (Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a rural school
and details specific requirements which the education authority is required to
follow if they are formulating a proposal to close a rural school. This includes
the introduction of a preliminary consultation process. 
In addition, the Community Empowerment (Scotland) Act 2015 sets out a new
right for community organisations to request the transfer of local assets into
local community ownership/management. Public bodies, including councils,
must consider such requests and respond to them within a reasonable
timescale. 
Southend Primary School has had zero pupils enrolled since elected members
approved the mothballing. 
On 25th August 2022, Community Services Committee agreed that the
Education Service would undertake the preliminary requirements in relation to
considering a rural school closure and look at an options appraisal for Southend
Primary School. This review will enable the Education Service to identify and
consider the options put forward.

Page 3

The 2010 Act makes special arrangements in regard to rural schools that is in
effect a presumption against their closure. There is a requirement to have
special regard to the rural schools factors prior to formulating a proposal to
close a rural school. In particular, it is necessary to consider any reasonable
alternatives before considering closure. It is also necessary to consider the
impact on the wider community of a potential closure and the impact of any
different travel arrangements. These factors have been considered in this
Options Appraisal. 
2.0  REASONS FOR THE PROPOSAL 
2.1  An authority that is contemplating formulating a rural school closure proposal
must satisfy the preliminary requirements set out in Section 12A of the 2010
Act before starting to prepare its Proposal Paper. In particular, it must identify
the underlying reasons why the future of the School is being considered, which,
in this case, are as follows: 
1. Southend Primary School has been mothballed for almost two years. The
school roll fell to zero as parents were choosing to place their children in
schools outwith the Southend catchment area to Castlehill Primary School. 
The school roll was very low and is not predicted to rise in the near future.  
2. Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. In January 2023 there were 15.9 fte vacancies
for both Head Teachers and Teachers. 
3. Whilst the School is mothballed, the building is deteriorating with limited
budgets for maintenance. 
The Council is therefore considering the future of Southend Primary School.
The various options are explored within this paper. 
3.0  BACKGROUND 
Argyll and Bute is an area of outstanding natural beauty sitting within an ancient
landscape with a strong cultural identity. Today, the culture of Argyll and Bute
is reflected in its traditional industries of fishing, farming and crofting, sports
such as shinty and in its world class musicians and artists as well as its modern
commercial industries such as wind turbine production and fish farming. 
Argyll and Bute is geographically the second largest authority in Scotland.
Education is delivered in a range of settings including schools, partnerships and
youth services. 
3.1  Argyll and Bute Corporate Plan 
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of
Scotland with outstanding places, people and potential for a prosperous future

Page 4

for everyone. Our Council along with our Community Planning Partners, is
committed to ensuring that Argyll and Bute’s Economic Success is built on a
Growing Population. 
This strategic approach embraces the vision for our area, our communities and
our people as outlined in the Corporate Plan. Our key service priorities support
the delivery of our commitments in the plans, helping to focus on local outcomes
that will achieve meaningful improvements for the area, our local communities
and our citizens. 
Councils have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value. Our Community Services Asset
Management Plan provides a review of the property assets used to deliver
services. It incorporates the School Estate Management Plan which reflects the
local implementation of Building Better Schools: Investing in Scotland’s Future,
the national school estate strategy developed by the Scottish Government in
conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within Building
Better Schools are reflected throughout Education and Children’s Services
Asset Management Plan (SAMP) for schools and public buildings, both in the
management of the existing assets and in the design and construction of
developments. 
corporate_plan_2018_181119_v2.pdf (argyll-bute.gov.uk) 
3.2  Our Children Their Future 
Councils, as an Education Authority, have a statutory duty in terms of the
Education (Scotland) Act 1980 to make adequate and efficient provision of
school education across their entire area for the current school population and
future pattern of demand. This is reflected in Our Children, Their Future:
Education Vision and Strategy. 
argyll_bute_vision_strategy_final_web.pdf (argyll-bute.gov.uk) 
3.3  Southend and the Local Area - the Southend Primary School Setting 
Southend is a scenically beautiful area situated at the end of the Kintyre
peninsula, only 13 miles across the North Channel from Northern Ireland.
Southend is a small and picturesque village which is situated approximately 9
miles from Campbeltown. The final stage of the Kintyre Way spans from
Southend to Machrihanish. The area is home to the historic attractions of the
13th Century Dunaverty Rock and Castle, St. Ciaran’s Cave, St. Columba’s
Chapel as well as Iron Hill Fort on the hill of Cnoc Araich where access is gained
from behind Southend Primary School. There is also an 18 hole golf course.
The area is popular with cyclists, hill walkers and nature enthusiasts.

Page 5

3.4  The School within the Community 
Southend Primary School was previously very active within the community. It
was a focus for social and educational events. The pupils invited the community
to attend events on many occasions every year as well as community members
volunteering with drama productions and activities such as golfing lessons.
Whilst being mothballed, there were no requests for the building to be used for
such events. With Dunaverty Hall, a community managed charity that host
various community events, being the hub of the village. 
3.5  Population 
Argyll and Bute has an average population density of just 0.13 persons per
hectare. This coupled with the changing demographic profile of the area
presents one of our greatest challenges. The table below refers directly to the
Southend area showing the changing population from census 2001 to census
2011: 
Table 1: Population Information 
Southend Area Census 
2001 2011
Total Resident
Population
165 Total Resident
Population
165
% under 16 28.48 % under 16 15.7
% 16 – 64 (pensionable
age)
50 % 16 – 64 (pensionable
age)
63
%  pensionable age
and over
21 %  pensionable age and
over
20 
It is recognised that the census area and the catchment area of Southend
Primary School differ slightly. The census cannot display results for that
postcode area alone because it could impact people’s privacy. Instead, it
groups the postcode with nearby postcodes. 
3.6  Development and House Building 
A new Local Development Plan (LDP2) is now available, which sets out
planning and development proposals for the next 10 years from 2020, and a
vision for 20 years. The Argyll and Bute Local Development Plan provides the
local planning framework for the Council area, excluding the Loch Lomond and
Trossachs National Park area. The Plan is divided into the written statement
and proposals maps. The written statement provides the general policy context

Page 6

against which planning applications for new development proposals should be
assessed. This is supported by the proposals maps which show the range of
development opportunities and constraints within the area, for example: 
 the key development areas i.e. the allocations for housing, industry and
business, community facilities and infrastructure;
 the potential areas for future development (Potential Development Areas);
 areas requiring actions such as environmental improvement or regeneration
(Areas for Action); and
 environmental designations such as national Scenic Areas, Sites of Specific
Scientific Interest (SSSIs), Special Protection Areas and Local Nature
Conservation Sites. 
 Appendix 1 shows the LDP2 for Southend 
 Appendix 2 shows the LDP2 for Castlehill 
 Appendix 3 provides the key for Local Development Plans.
3.7  Southend Primary School 
Southend Primary School is situated outside of the village of Southend and was
built in 1886 with an extension added in 2005/06. The school is co-educational
and non-denominational with Early Learning and Childcare available. It has a
catchment area extending from Carskiey to Macharioch and Fiochaig to
A’Chruach. The school has one large open plan classroom, Library, Active Play
Area and Snug. The Hall was used by pre 5 Monday to Wednesday and was
also used for activities such as physical education and drama performances. 
The hall can also be used as a dining area as it is next to the kitchen. The
school has two playgrounds, one of which is enclosed. Within the playground
there is a pavilion, Wendy House, mud kitchen area, picnic tables and raised
beds for plants. The larger playground includes a wooden climbing frame and
a habitat area with pond. There are also coloured number and PE tarmac
markings. 
Appendix 4 shows the Southend Primary School Floor Plan. 
Southend Primary School is 8.7 miles from Castlehill Primary School. The area
is sparsely populated. Southend Primary School is situated on the side of the
B842 that leads from Campbeltown to Southend. 
The Scottish Government’s Rural School List 2021 classifies Southend Primary
School as ‘very remote rural’. This is defined as an area with a population of
less than 3,000 people, and with a drive time of over 60 minutes to a settlement
of 10,000 or more. Southend Primary is one of 8 primary schools associated
with Campbeltown Grammar School. 
Rural schools in Scotland - gov.scot (www.gov.scot) 
3.8  Castlehill Primary School

Page 7

Following the mothballing of Southend Primary School, children from the
Southend catchment area attended Castlehill Primary School. Castlehill
Primary School is a non-denominational and co-educational school situated in
the town of Campbeltown at Ralston Road. Castlehill Primary serves part of the
town of Campbeltown and much of the area to the south and east of the town. 
The original school building was constructed in 1876 and is still used today. The
school accommodation is split over two levels with a reception office, school
kitchen and dining hall. The school has a playground that wraps around the
school building. The school has close links with Campbeltown Nursery. 
Appendix 5 shows the Castlehill Primary School Floor Plan. 
The school has strong and active traditions in instrumental music, in sport and
physical activity. The school enjoys the support of an active Parent Council and
strong community partners. 
The Primary School building has facilities for pupils, visitors and special access
needs. With its central location within Campbeltown, Castlehill Primary School
is not on the Scottish Government’s Rural School List 2021. Campbeltown
Grammar School is the associated Secondary School for Southend, Dalintober,
Drumlemble, Castlehill, Carradale & Glenbarr pupils. Pupils at Rhunahaorine
and Gigha are given the choice between Tarbert Academy and Campbeltown
Grammar.   
The Map below shows the adjoining catchment areas of Southend and
Castlehill Primary Schools Catchment Areas:

Page 8

3.9  Pupil Numbers 
Pupil projections, and data for 2023-24 are based on the 2022 pupil census, a
return prepared annually for the Scottish Government. Past pupil numbers are
historic data from past pupil censuses. Pupil projections are based on 3/5 years
intake and updated post P1 registration.

Page 9

Table 2 shows the historic and current pupil numbers for both Southend and
Castlehill Primary schools: 
Table 2:  Southend PS Castlehill PS  
Roll Roll
Capacity 50 459
2005-06 46 289
2006-07 41 276
2007-08 38 257
2008-09 33 243
2009-2010 32 218
2010-2011 27 195
2011-2012 22 189
2012-2013 22 178
2013-2014 18 180
2014-2015 17 184
2015-2016 16 188
2016-2017 18 182
2017-2018 5 197
2018-19 6 210
2019-20 7 205
2020 -2021 0 203
2021 -2022 0 194
2022-2023 0 189 
Table 3 shows projected rolls for Castlehill Primary School and estimated
numbers of pupils in the Southend Primary School catchment area according
to figures held by Argyll and Bute Council: 
Table 3:  Southend PS Castlehill PS  
Roll Roll
Capacity 50 459
2023 -2024 8 189
2024 -2025 8 180
2025-2026 8 173
* A prediction based on information available at December 2022. Southend    
information based on prediction available at December 2019 
The Southend Primary School roll further dropped to 3 over the course of the
2019-20 school year (see Table 2, above) and was expected to reduce further
at the point of mothballing in April 2021. Pupils within the catchment area (as
set out in Table 3, above) did not reflect the number of pupils attending the

Page 10

school because parents chose to send their children to schools within the
Campbeltown area. 
4.0  COMMUNITY ENGAGEMENT 
4.1  Meetings 
A Community Engagement Meeting was held in Southend Primary School, on
17th November, 2022 from 09:00-18:00 hours. This was to seek the views of
the community on the future of Southend Primary School. This meeting was
attended by 43 people. There was also a meeting in Dalintober Primary School
to gather opinions from parents who will be impacted by any decision that is
made in relation to Southend Primary School. Dalintober Primary School have
3 members of staff re-deployed from Southend PS to Dalintober PS. Virtual
meetings took place with a young person from Campbeltown Grammar School
who was impacted by the mothballing of Southend Primary School and the
Head Teacher of Southend Primary School who currently teaches at Dalintober
Primary School. The Head Teacher at Dalintober Primary School took part in a
virtual meeting. Meetings were also offered to Castlehill and Drumlemble
Parent Councils. Three secondary aged young people and one primary aged
young person participated in the Community Engagement Meeting. The parent
and toddler group within Southend were contacted on two occasions to be given
the opportunity to feed into the preliminary engagement exercise. An email
contact was also given to individuals during the Community Engagement event
to encourage more feedback from this group. No response was received. 
4.2  Content of Meetings 
Attendees at the meetings were given an overview of the information that the
Council would be using in this Options Appraisal, this included pupil projections,
development information and local services and facilities. 
The questions were as follows: 
Over the last three years, what has been the effect of mothballing Southend
School on you, your family and community? 
In your view what are the pros/cons of the following options: 
 Continue with mothballing
 Re-open the school
 Close the school
 Re-open the school but widen the catchment area 
Attendees also noted questions regarding the future of the school, and points
of information that should be considered in the Options Appraisal. 
4.3  Feedback

Page 11

There was a range of viewpoints on the future of Southend School: 
 Community and Parents
The majority of the community felt that continuing to mothball the
school was not an option. It was felt that a decision should be made
as the building would only continue to deteriorate. A small number
felt this might be beneficial to allow pre 5 children in the area to get
to the stage where they were ready to attend school. The majority of
the community believed that the most viable option is to formally
close the school as decline in school roll at the school had been as a
result of parents choosing to send their children to schools within the
Campbeltown area. There was a small percentage of people in
support of opening the school but said that they would need to see
what this looked like before they were able to commit to sending their
child to school there. There are 18 children who attend a local baby
and toddler group. This was seen as a strong reason to keep the
school open by some members of the community. The group was
approached to provide feedback and members of the group were
encouraged to discuss and provide feedback via direct email. 
Neither opportunity provided further feedback. The community were
all in agreement that changing the catchment area would not be a
viable option given the geographical area. 
 Children/young people 
The young people who were now at Campbeltown Grammar had
voiced that they loved being at school at Southend Primary and had
had a positive experience. A younger pupil reported that their
transport to school at Castlehill had improved since Southend
Primary School had been mothballed, they enjoyed being at
Castlehill Primary school. Another pupil reported that they benefitted
from more friends and a wider range of opportunities having moved
from Southend to Castlehill Primary School. There are currently no
pupils at Southend Primary and pupils felt that they did not want to
give an opinion on what should happen to the school but did feel a
decision should be made about the building, mothballing was not a
viable option for them. A young person who had attended the school
would have liked to have seen it re-open but recognised that this
would cost money. A younger pupil did not want the re-opening of the
school if it would impact on their transport to Castlehill Primary as
they found service prior to mothballing stressful. 
 Staff 
Staff members were sad at the thought of the School being closed
but felt that they had dealt with the most difficult period when the
decision was made to mothball the school. Staff members felt that
the low pupil numbers was not providing a rich educational
experience for pupils.

Page 12

General Comments: 
“We would like to see parents choosing the school.” 
“My child attends school in town and this has been good for her socially. My
youngest is likely to follow her to the same school as opposed to attending
Southend Primary” 
“The school didn’t close due to lack of children, it closed due to parental
choice.” 
“We would only send our child to the school if numbers permitted.” 
“Individual communities will be lost if there is an amalgamation (new large
school campus). Communities are all diverse.” 
“There is a lot of potential through the Pre 5 group.” 
“In an ideal world it is great to see small schools but difficult to get staff.” 
“We think it won’t re-open if we are being realistic. Can it be staffed?” 
“Realistically, I can’t see it re-opening” 
“The longer it is left mothballed, the more it will deteriorate.” 
“I personally can’t see me moving my children if the school re-opened. I value
the standardisation, social aspect and social contact in a big school. Schools
in town have capacity to take increased numbers.” 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE
PROPOSAL AS CONSIDERED BY THE COMMUNITY ENGAGEMENT 
Southend Primary School has been mothballed for almost 2 years. The school
roll had dramatically declined after 2017. Although the census information
illustrates that in 2019-20 the school roll was 7 pupils (see Table 2, above), this
reduced to 3 (2 of which were siblings) over the course of the year. Discussion
took place with the Head Teacher and parent community at the time, who all
acknowledged the limitations that pupil numbers were placing on the
opportunity for social interaction. The decision was made by the relevant
parents that the pupils would have the opportunity for increased social
interaction at Castlehill Primary School. The decline in pupil numbers at
Southend Primary School was as a result of placing requests to Castlehill
Primary School, with a small number also choosing to attend Drumlemble

Page 13

Primary School and Dalintober Primary School. A small number of parents with
pre-school children are supportive of the school re-opening. Parents with
children at Castlehill Primary School wished current arrangements to continue
and reported that siblings would be attending Castlehill Primary School. There
is very limited support for the reopening of Southend Primary School. 
Whilst the building is mothballed it continues to deteriorate. The Community is
very proactive and have positive suggestions as to how the building could be
used. Along with several other rural councils, Argyll and Bute is facing
increasing challenges in recruiting staff. In January 2023 there were 15.9 fte
vacancies for both Head Teachers and Teachers. Recruitment in the South
Kintyre area is challenging due to the rural location. 
The Council is required to consider the future of Southend Primary School. The
following options are explored within this paper: 
a) Re-open Southend Primary School.
b) Continued Mothballing of Southend Primary with the pupils zoned to
Castlehill Primary School.
c) Re-open Southend Primary School and realign its catchment area.
d) Close Southend Primary School and realign its catchment area to Castlehill
Primary School. 
6.0      OPTION A: RE-OPEN SOUTHEND PRIMARY SCHOOL 
6.1  Community Feedback 
Of the 43 community members that attended the Options Appraisal
engagement event, only 3 families wished for the school to re-open. There was
concern expressed that they were being asked to give views on this without
knowing fully what the school would look like. Pupil numbers and staffing would
influence their final parental decision. It was also felt that the ELC needed to be
in place for this to be a successful school as if pre-school children are attending
an ELC in Campbeltown, they would progress to the same school in town as
their peers as opposed to breaking up friendship groups. The community were
divided in their opinions.   
6.2 Pupil Numbers 
If the school were to reopen in August 2023, the maximum pupil numbers from
the catchment would be one. This would be one new pupil. All parents involved
in the consultation stated that they would not move their child from another
school as they were settled and friendships were established. Pupils currently
within the catchment area of Southend Primary School either attend Castlehill
Primary School, Drumlemble or Dalintober Primary School. It has been stated
that without a viable number of pupils for the School parents would not be
considering placing their children to attend Southend Primary School if it were
to re-open.

Page 14

If the school were to re-open sustainability may not be viable due to the fact
that pupil numbers over the next four years are not predicted to rise and are
well below the capacity of the school building. It has also been stated that
parents would choose to place their children in a school within Campbeltown
as older siblings were already attending school there or because it is more
convenient for after school clubs. 
Parents felt that the ELC may be beneficial to the area and that this may grow
numbers for the school in the longer term. The ELC had previously been open
part time. Four Children attended the ELC on a Monday, Tuesday and
Wednesday. During the pandemic, parents had to choose between Southend
ELC and Campbeltown ELC as split placements were not permitted. This
resulted in no pupils attending the Southend ELC. As friendships are formed at
ELC, parents have chosen not to split friendships when children are
progressing onto school, therefore Castlehill Primary becomes a preferred
option. 
Table 4: Pupil Numbers
Southend
Primary
2023/2024 2024/2025 2025/2026
Approved
Capacity
50 50 50
Roll
Projection
8 8 8 
6.3 Financial Information 
The total amount including employee; premises; supplies and services and
catering consideration to re-open the school is £139,024. 
The annual cost of mothballing Southend Primary School is £5,936. 
The cost to bring the property to an acceptable standard to re-open the school
is £7,300.   
6.4  Assessment of Rural Factors 
The reasons why the future of Southend Primary School is being considered
are as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Southend Primary School to increase. Southend Primary School is
currently mothballed. The mothballing of the school was due to decline in pupil
numbers as a result of parental choice.  Some members of the community (who
did not have school age children) stated that the way to re-open the school was
to insist that parents within the catchment area send their children to the school. 
However parents have the legal right to express a preference for a particular
school that they want their children to attend, and the placing request system
is in place to consider this.

Page 15

6.4.1  Community Impact 
The reopening of the school would enable the premises to be used by
the community. It would also be a possibility that the school pupils would
invite the community to specific events. The presence of a school and
the facilities/activities that may be offered could make the area a more
attractive place to live. Reopening the school may therefore encourage
families with school age children to move to the community. This in turn
may make the community more sustainable. 
However the community have demonstrated that there is a limited desire
for the school to reopen. The majority who attended the community
engagement indicated the need for the school to become a facility for
the community or local tourism to use rather than an educational
establishment. 
As Southend has an established community hall, Southend Primary
School has not been used for community use since it has been
mothballed. Respondents noted the negative impact of the school
mothballing on the community as: 
 The visual impact on the community of the mothballed school.
 The continued deterioration of the building. 
If the school were to reopen as an educational establishment there would
be an economic impact with respect to the expenditure needed to bring
the building up to standard. There would also be costs relating to staffing,
and ongoing maintenance. The reopening of the school and the potential
relocation of families may have a positive effect on the wider economy
of the community. 
6.4.2  Travel Arrangements 
The travel distance (AA route finder) from Southend Primary to Castlehill
Primary is 8.7 miles via the B842. Travel time is approximately 14
minutes. The travel arrangements have been in place for almost two
years. Travel is an accepted aspect of living in the Southend community.
Southend Primary School is situated outside of Southend village with no
pavement running from the village to the school. If Southend Primary
school was to reopen there could be a positive impact on the health and
wellbeing and education of pupils who are able to walk or cycle to school
but the lack of safe routes to the school limits this. Staff would either
travel to the school by car, or if they live locally could walk or cycle. There
may be a positive environmental impact as the use of vehicles to
transport pupils may decrease. Conversely, there could be increased car
usage by staff which may mean these travel arrangements have a
negative environmental impact. The respective positive and negative
impact may therefore balance.

Page 16

6.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
With respect to outdoor learning, community spaces could be used either in the
school grounds or in the immediate neighbourhood if the school were to reopen. 
Outdoor learning is provided by all schools. 
With continued mothballing of the building, there would be issues with respect
to the current condition and suitability of the school buildings and facilities which
would negatively impact learning and teaching.   
6.6  Summary 
The 43 people who attended the consultation were divided in relation to the re-
opening of Southend Primary as a school. If the school reopened, pupil
numbers within the catchment area would be eight, as of the September 2022
census, and this is not predicted to rise over the next three years. The
catchment numbers are similar to that when the school roll dropped to an
unsustainable number in April 2021 when the school was mothballed. The
catchment numbers do not reflect the school roll numbers. 
There are financial implications if the school is to be reopened. The total amount
including employee; premises; supplies and services and catering
consideration to re-open the school is £139,024 with the cost to bring the
property to an acceptable standard to re-open the school is £7,300.   
If the School was to be reopened, the premises would be able to be used by
the community, in addition to its use as an educational facility. However, with
the village hall being in regular use, this impact would be limited. The reopening
of the School may encourage families with school age children to move to the
community, which may make the community more sustainable. 
The travel distance (sourced from AA Route Planner) from Southend Primary
to Castlehill Primary is 8.7 miles via the B842. Travel time is approximately 14
minutes. Adverse weather can be a factor, however this is the same for other
local schools and areas. The travel arrangements have been in place for almost
2 years. Should the school reopen, there may be a positive environmental
impact as the use of vehicles to transport pupils may decrease. Conversely,
there could be increased car usage by staff which may mean these travel
arrangements have a negative environmental impact. The positive and
negative impact may balance.

Page 17

There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
When considering the above alongside projected low pupil numbers, the
challenges in recruiting teaching staff and the expenditure needed to bring the
building up to standard and the limited local support for reopening Southend
Primary School this is not considered to be a reasonable option. 
7.0  OPTION B: CONTINUED MOTHBALLING OF SOUTHEND PRIMARY
SCHOOL WITH PUPILS ZONED TO CASTLEHILL PRIMARY SCHOOL 
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school
and the desirability of maintaining capacity to re-open a school there, but it is
unlikely that it should exceed 3 years in areas that are not very remote.”
Southend Primary School has been mothballed for 2 years. 
7.1  Community Feedback 
There are many ideas for the future of the building being discussed by the
community as base for outdoor activities, gym and tourism facility. Only one
person voiced that mothballing would not bother them as their child was not of
school age yet. Everyone else at the community meeting felt that mothballing
the school over a long period is wasteful due to deterioration of the property
and should not be prolonged: 
“As long as it’s maintained, we don’t care what happens to it.” 
“The longer it is left mothballed, the more it will deteriorate.” 
“Not viable.  Decision needs to be made.” 
“I don’t think there is any point to continuing to mothball the schools.” (Young
Person) 
“This wouldn’t bother me as my child isn’t quite ready to go to school.” 
7.2 Pupil Numbers 
Pupil numbers are not projected to increase over the next 4 years, as per Table
4 above.   
7.3  Financial Information 
The current annual cost (2022/23) to the Council of the mothballed Southend
Primary School is £5,936. This includes electricity, heating oil, and ground
maintenance, building maintenance and repair costs. It does not take into

Page 18

account the cost to bring the property to an acceptable standard to re-open the
school which is £7,300. There is no current annual transport cost of taking
pupils to alternative schools. 
7.4  Assessment of Rural Factors 
The reasons why the future of Southend Primary School is being considered
are as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Southend Primary School to increase. Southend Primary School is
currently mothballed. Only a small number of parents whose children are within
the catchment area attended the community engagement event. No parents
planned on moving their child to Southend PS should the school re-open. To
reopen the school would not in itself increase the pupil numbers. 
7.4.1  Community Impact 
If pupils are to continue their education in Castlehill Primary School there
would be no change to the current impact on the community. If the
mothballing of Southend was to continue the building would deteriorate
further and eventually become unavailable. There is concern with
regards to the deterioration of the property and the impact of this on the
neighbouring residential property that has a shared wall. This could have
a detrimental effect on the sustainability of the Southend community. As
the school is situated outside of the village of Southend, the building and
grounds are currently not being used. There were some signs of minor
vandalism of outside planters on the school property. The community
view the buildings and grounds as an opportunity to develop an outdoor
learning facility for residential use or a bunk house/youth hostel
accommodation. As the Kintyre Way is a popular tourist destination and
the area lends itself to the active tourism industry, the community felt that
this use may continue to benefit young people as well as attract tourism
into the local economy. This may make the area a more attractive place
to live. 
7.4.2  Travel Arrangements 
There is no change to the travel arrangements that are currently in place
nor to the environmental impact from these. The travel distance (AA
route finder) from Southend Primary to Castlehill Primary is 8.7 miles via
the B842. Travel time is approximately 14 minutes. The travel
arrangements have been in place for almost two years. Travel is an
accepted aspect of living in the Southend community. Continued
mothballing of Southend Primary School would have no effect on current
staff travel. The small number of children has minimal effect on staffing
within the receiving primary schools. 
7.5  Educational Benefits

Page 19

The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Southend Primary School is a remote rural school, Castlehill Primary School
has a central location and is therefore not classified as a rural school (Scottish
Government classification). Children from Southend area, attending Castlehill
Primary School are benefitting from learning with a number of peers at the same
age and stage as themselves as opposed to a single classroom/multi composite
classrooms. Pupils also benefit from increased friendship groups that a large
school can offer. Outdoor learning is currently provided at Castlehill Primary. 
The partnership between Campbeltown nursery and Castlehill Primary School
enhances the transition process for the children moving from Nursery into
Primary one, through liaison between the two settings. Transition to secondary
school is enhanced through joint planning and educational experiences. A
young person reported that the transition to secondary school was easier for
them as they knew more people when moving from Castlehill to Campbeltown
Grammar as opposed to if they had remained at Southend Primary School. 
7.6  Summary 
The majority of people who attended the community engagement event were
not in favour of continuing the two year mothballing of Southend Primary
School. There was a significant view at the community meetings that
mothballing the school over a long period was wasteful due to deterioration of
the property and potentially affected sustainability of the community. Pupil
numbers are not predicted to rise in terms of pre-school children living within
the catchment area. Mothballing had no positive impact on the reasons for the
proposal. 
The current annual cost (2022/23) to the Council of the mothballed Southend
Primary School is £5,936. This includes electricity, heating oil, and ground
maintenance, building maintenance and repair costs. It does not take into
account the cost to bring the property to an acceptable standard to re-open the
school which is £7,300. There is no current annual transport cost of taking
pupils to alternative schools. 
The travel distance (AA route finder) from Southend Primary to Castlehill
Primary is 8.7 miles via the B842. Travel time is approximately 14 minutes.
Adverse weather can be a factor, however this is the same for other local
schools and areas. The travel arrangements have been in place for more than
two years. Should the school continue to be mothballed these travel
arrangements would continue.

Page 20

There are no specific educational benefits from continuing the mothballing of
Southend Primary school. 
On the basis that pupil numbers are not expected to increase and the building’s
mothballing is not of benefit to the community or the Council, continued
mothballing of Southend Primary School is not viewed as a reasonable option. 
8.0  OPTION C: RE-OPEN SOUTHEND PRIMARY SCHOOL AND EXTEND ITS
CATCHMENT AREA 
8.1  Community Feedback 
The existing catchment area for Southend Primary School is very rural and very
sparsely populated. It already covers a broad area. 
When considering the option to realign the catchment area of Southend, the
map within Section 3.8, above, demonstrates that the boundary could only be
moved closer to Campbeltown. Everyone within the community engagement
event felt that this was an unrealistic proposal for Southend Primary School.
They did not believe a change of boundary would make any difference. The
community felt that by moving the boundary closer to town, you would be
increasing transport time for pupils who already attended school within the
Campbeltown area. Transport would go against the direction of travel for
parents who were working within the Campbeltown area and where many after
school clubs are based. Extension of any boundary into the Drumlemble
catchment area would require an additional bus service and would impact on
pupil numbers of another remote and rural school. 
Community views are: 
“Not viable” 
“Cost of fuel needs to be considered” 
8.2  Pupil Numbers 
The pupil numbers within this new catchment area would not increase the roll
significantly. As part of any possible forthcoming consultation, there would be
discussions with the parent body of Castlehill Primary School regarding the
future of Southend Primary School. During the preliminary engagement
exercise there were views represented from the Parent Councils of Drumlemble
and Dalintober Primary Schools. Both schools expressed their concern over the
staffing of schools within the area. There was no representation from the Parent
Council of Castlehill Primary School at the Options Appraisal Meeting or
following. They were approached to give their views. It was felt by attendees at
the meeting that moving the catchment area of Southend Primary School was
not an option due to the remote nature of the location, the road and accepted
direction of travel.

Page 21

8.3  Financial Information 
The total amount including employee; premises; supplies and services and
catering consideration to re-open the school is £139,024. 
The cost to bring the property to an acceptable standard to re-open the school
is £7,300.   
There would also be a financial cost associated with the recruitment of
additional staff and ongoing associated costs. 
8.4  Assessment of Rural Factors 
The reasons why the future of Southend Primary School is being reviewed are
as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Southend Primary School to increase. Southend Primary School is
currently mothballed and the pupils are rezoned to Castlehill Primary School. 
To reopen Southend Primary School and realign its catchment area could
increase the pupil numbers if families were to send their children to Southend
Primary School however the geography of the local area and existing wide
catchment area does not lend itself to this option. 
8.4.1  Community Impact 
The reopening of the school with a larger catchment area would enable
the premises to be used by the community. It would also be a possibility
that the school pupils would invite the community in to specific events.
The presence of a school and the facilities/activities that may be offered
could make the area a more attractive place to live. Reopening the
school may therefore encourage families with school age children to
move to the community. This in turn may make the community more
sustainable. However, the community has given no support for this
option. 
If the school were to reopen as an educational establishment there
would be an economic impact with respect to the expenditure needed
to bring the building up to standard. There would also be costs relating
to staffing, and ongoing maintenance. The reopening of the school and
the potential relocation of families may have a positive effect on the
wider economy of the community. 
8.4.2  Travel Arrangements 
The travel distance (AA route finder) from Southend Primary to Castlehill
Primary is 8.7 miles via the B842. Travel time is approximately 14
minutes. The travel arrangements have been in place for almost two

Page 22

years. Any change in boundary would require a new bus route with
expenditure associated with it. This is not a realistic proposal as it would
be likely to have minimal impact on pupil numbers at Southend Primary
School and parents reported that they choose to place children in
schools closer to Campbeltown due to after school childcare or clubs
and activities. Travel is an accepted aspect of living in the Southend
community.   
If Southend Primary school was to reopen there could be a positive
impact on the health and wellbeing and education of pupils who are able
to walk or cycle to school but the lack of safe routes to the school limits
this. Staff would either travel to the school by car, or if they live locally
could walk or cycle. The bus route for a small number of pupils would
have a negative impact on the environment especially as this may result
in increased car traffic at end of school day to get pupils to clubs on time.
Conversely, there could be increased car usage by staff which may
mean these travel arrangements have a negative environmental impact.
The proposal could create a negative environmental impact. 
8.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Southend Primary School is a remote rural school, Castlehill Primary School
has a central location and is therefore not classified as a rural school (Scottish
Government classification). Children from Southend area, attending Castlehill
Primary School are benefitting from learning with a number of peers at the same
age and stage as themselves as opposed to a single classroom/multi composite
classroom. Pupils also benefit from increased friendship groups that a large
school can offer. Outdoor learning is currently provided at Castlehill Primary. 
The outdoor facilities either in the school grounds or in the immediate
neighbourhood of Southend Primary School would offer the opportunity to
develop a curriculum that maximises the use of the local environment
supporting the individual needs of the learners. 
8.6  Summary 
There was no support, by those who attended the community engagement
event, in favour of re-opening Southend Primary as a school, and realigning its
catchment area due to the remote nature of the school’s location.

Page 23

There are financial implications if the school is to be reopened. The total amount
including employee; premises; supplies and services and catering
consideration to re-open the school is £139,024. The cost to bring the property
to an acceptable standard to re-open the school is £7,300. There would also be
a financial cost associated with the recruitment of additional staff and ongoing
associated costs. 
If the School was to be reopened, the premises would be able to be used by
the community, in addition to its use as an educational facility. The reopening
of the school may encourage families with school age children to move to the
community, which may make the community more sustainable. 
The travel distance (AA route finder) from Southend Primary to Castlehill
Primary is 8.7 miles via the B842. Travel time is approximately 14 minutes. The
travel arrangements have been in place for almost two years. Any change in
boundary would require a new bus route with expenditure associated with it.   
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Due to the geographic location of this very remote rural primary school it is
unlikely that the catchment area could be made more sustainable. While this
option could in theory contribute to sustainability of the community that may not
be the case as most pupils in the neighbouring catchment area travel in the
direction of Campbeltown, towards the larger centre of population, and not
towards Southend. It would require pupils who may have already settled in
Castlehill Primary School and Dalintober Primary School to move to Southend
Primary School. Many Southend families have stated they would not move their
children back to Southend as their children are currently settled in school. All
families would be entitled to submit a placing request to attend Castlehill
Primary School, Dalintober Primary School or Drumlemble Primary School. It is
unlikely that pupil numbers would increase significantly. 
When considering the above, alongside the challenges in recruiting teaching
staff, the considerable expenditure needed to bring the building up to standard
and the lack of local support for reopening Southend Primary School, this is not
considered to be a reasonable option. 
9.0  OPTION D: CLOSE SOUTHEND PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR CASTLEHILL PRIMARY SCHOOL TO INCLUDE
THE CURRENT SOUTHEND CATCHMENT AREA 
9.1  Community Feedback 
The majority of people who attended the Options Appraisal meeting were not
in favour of re-opening Southend Primary as a school. They commented that
the closure of the school was not down to pupil numbers but parental choice 
The small numbers of those in favour of the school re-opening wanted to know

Page 24

what this would like in terms of staffing and pupil numbers before they would
commit to sending their children there. Some members of the community with
no children wished the school to open but wanted parents to use the local
school as opposed to schools based in Campbeltown, it was explained that
parental choice would mean that this is something that could not be enforced.
Additionally, with respect to low numbers in future school roll projections, the
sustainability of the School did not support re-opening of the School. Projected
numbers are similar to the numbers when the school was mothballed.
Comments in relation to the closure of Southend Primary School and
attendance at Castlehill Primary School were positive: 
“We think it won’t re-open if we are being realistic. Can it be staffed?” 
“My child attends school in town and this has been good for her socially. My
youngest is likely to follow her to the same school as opposed to attend
Southend Primary” 
“I think it should close.” 
“No one is saying to me that we should keep it open.” 
“Security and cost of current situation is too much.” 
“Realistically, I can’t see it re-opening” 
“I personally can’t see me moving my children if the school re-opened. I value
the standardisation, social aspect and social contact in a big school. Schools in
town have capacity to take increased numbers.” 
“My two children attended Castlehill on placing request. We now have
transport.” 
“Disappointing but understand why it had to happen.” 
“A small school is not equitable to a large school as there is 1 teacher between
4/5 pupils as opposed to larger class sizes” 
“I lived there, I did not choose for my child to go to Southend. I have now moved
out the area. My child wanted to be in the mix of pupils.” 
“I would hate to see it close but I have chosen to put my child elsewhere.” 
“I feel we have a lot of small schools. Our school has benefitted from the
staffing. We are concerned about current staffing levels, re-opening the school
would place further pressures on this.” 
“Money saved but not re-opening school could be used to support other
schools” 
“Large schools benefit from the social contacts.”

Page 25

“Socially, I feel it is better for children to be in a larger social group” 
A number of parents commented on the wish for there to be an ELC or pre 5 facility. 
Members of the community commented that it was sad to see the building not being
used at all and that a re-purposing of the building would be better for the community. 
Suggestions included for residential trips, bunk house or youth hostel type facility that
would make use of the local environment for active tourism. 
9.2  Pupil Numbers 
Table 5: Schools Occupancy: 
Primary 2023/24 2024/25
Approved
Capacity
Castlehill
Primary
459 459
Projected
Roll
Castlehill
Primary
185 180
Southend
Projected
Roll
8 8
Total Roll
Projection
Castlehill
Primary
193 189 
Occupancy
42% 41% 
Pupils from Southend Primary catchment area would attend Castlehill Primary
School. As there is a declining school roll at Castlehill Primary School, the
predicted occupancy rate for Castlehill Primary School is 41%, easily
accommodating any additional numbers. 
9.3  Financial Information 
As there is an existing bus route for pupils to attend Campbeltown Grammar
School, there is no additional service required to transport pupils in Southend
to Castlehill Primary School. An existing West Coast bus means that there
would be no additional annual transport costs. If Southend Primary School were
to be closed it would generate savings of £5,936, the current annual cost of
mothballing (2022-23) to the Council. This includes electricity, heating oil, and
ground maintenance, building maintenance and repair costs. 
9.4  Assessment of Rural Factors

Page 26

The reasons why the future of Southend Primary School is being reviewed are
as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Southend Primary School to increase. Southend Primary School is
currently mothballed and were there pupils they would be rezoned to other
schools. To reopen the school would not increase the pupil numbers.   
9.4.1  Community Impact 
There was support in the community for the closure of the school. The
community were realistic that given the current financial climate, the
building may be sold off. Within Southend there is a village hall. The
majority of those who attended stated the school building should be used
to benefit young people in the area, support the local economy and not
fall into further disrepair, as that would adversely impact on the visual
impact of the village. While it is accepted that school closure may have
an adverse effect on community sustainability to a degree, it was felt that
the mothballing of the school and the building not being used at all was
a bigger negative impact to the community. Southend community felt that
they benefitted greatly from vibrant use of their local hall. A re-purposing
of the building could potentially have a very positive impact on the
sustainability of the community if this option were to progress. The
buildings forming the school premises are situated within walking
distance of the village. If the building was re-purposed for residential or
tourism use, this would have a positive impact on the sustainability of the
village. Formal closure of the school would mean that these plans could
potentially be progressed. 
9.4.2  Travel Arrangements 
The travel distance (AA route finder) from Southend Primary to
Castlehill Primary is 8.7 miles via the B842. Travel time is
approximately 14 minutes. The travel arrangements have been in place
for almost two years. Travel is an accepted aspect of living in the
Southend community. This option would have no effect on the current
travel arrangements of staff and pupils. The closure of Southend
Primary School, in terms of travel would have a neutral effect on the
environment. There is currently no annual transport cost for pupils to
travel to Castlehill Primary School and the use of the existing West
Coast Motors service bus would not incur additional costs in the
immediate future. 
9.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits as all schools implement Curriculum
for Excellence ensuring effective learning and teaching which is matched to the
needs of children.

Page 27

Southend Primary School is a remote rural school, Castlehill Primary School
has a central location and is therefore not classified as a rural school (Scottish
Government classification). Children from Southend area, attending Castlehill
Primary School are benefitting from learning with a number of peers at the same
age and stage as themselves as opposed to single classroom/multi composite
classrooms. Pupils also benefit from increased friendship groups that a large
school can offer. Outdoor learning is currently provided at Castlehill Primary.
The pupils would be transitioning to Campbeltown Grammar School with an
established friendship group. 
In Castlehill Primary School children benefit from being part of a social context
in which they can build relationships with different groups and individuals,
develop social skills, meet challenges and exercise responsibilities as members
of a social group. They are able to interact and socialise with groups of children
of their own gender, take part in team activities and move with their peers to
secondary school. One pupil reported that they had increased opportunities as
a result of being at a larger school. Another pupil reported that they were less
stressed now because of the transport arrangements in place. 
9.6  Summary 
From those who attended the community engagement event, there was support
for the closure of Southend Primary as a school, and realigning the catchment
area of Castlehill Primary School due to the remote nature of the school’s
location. They also commented on the potential for the school premises to be
used to attract people into the area for residential activities, travel and tourism. 
Current capacity for Castlehill Primary School is 42%. As there are existing
transport arrangements in place and transport is not currently in place for
Southend Primary School, there is no increased annual cost to transport pupils
to Castlehill Primary School and use of the existing West Coast Motors service
bus would not incur additional costs. 
The travel distance (AA route finder) from Southend Primary to Castlehill
Primary is 8.7 miles via the B842. Travel time is approximately 14 minutes. The
travel arrangements have been in place for almost two years and this option
would have no effect on the current travel arrangements of staff and pupils. 
Travel is an accepted aspect of living in the Southend community. The closure
of Southend Primary School would therefore have a neutral effect on the
environment. Castlehill Primary School currently accommodates pupils from
Southend Primary School and pupil numbers are not projected to increase
significantly. Castlehill Primary School has capacity to continue to
accommodate the projected pupil numbers. 
In Castlehill Primary School, children benefit from a positive learning
environment with learning and teaching which is better matched to the needs
of the young people who attend the school. In addition there are more
opportunities for personal and social development in this setting.

Page 28

This has been identified as a reasonable option for further consideration.       
10.0  OVERVIEW OF OPTIONS 
Option Option Description Outcome
A Re-open Southend Primary School with
the existing catchment area.
Not a reasonable option.
B Continued Mothballing of Southend
Primary School with the pupils zoned to
Castlehill Primary School. 
Not a reasonable option.
C Re-open Southend Primary School and
extend its catchment area.
Not a reasonable option
D Close Southend Primary School and
realign the catchment area of Castlehill
Primary School to include the current
catchment area for Southend Primary
School.
A reasonable option with
strong representation
that the school becomes
a facility the community
can develop. 
11.  DETAILED ANALYSIS OF REASONABLE OPTION: CLOSE SOUTHEND
PRIMARY SCHOOL AND REALIGN THE CATCHMENT AREA FOR
CASTLEHILL PRIMARY SCHOOL TO INCLUDE THE CURRENT
SOUTHEND CATCHMENT AREA 
11.1 Pupil Projections 
Primary 2023/24 2024/25
Castlehill
Primary
Approved
Capacity
459 459 
Castlehill
Primary
Projected
Roll 
185 180
Southend
Primary
Projected
Roll
8 8
Total Roll
Projection
193 189 
Occupancy 42% 41% 
11.2  Educational Benefits

Page 29

This statement focusses on Castlehill Primary School, which is the school most
Southend Pupils have been attending since May 2021. 
11.2.1  Learning and Teaching 
The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to
help every child and young person to develop knowledge, skills
and attributes for success in learning, life and work. 
In Castlehill Primary School, children are encouraged to be eager
and active participants who are engaged, resilient and highly
motivated during their learning. Children know that their views are
sought, valued and acted upon. The learning environment
encourages a high level of achievement, providing a wide range
of opportunities for children to achieve their full potential within
the four contexts of learning. 
In Castlehill Primary School children may be taught in single year
group classes or composite classes composed of children from
no more than two year groups. Children benefit from being part of
a social context in which they can build relationships with different
groups and individuals, develop social skills, meet challenges and
exercise responsibilities as members of a social group. They are
able to interact and socialise with groups of children through a
variety of learning activities as well as take part in team activities
and move with their peers to secondary school. 
There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National
Improvement Framework priorities include raising attainment for
all, and closing the gap between the most and least
disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in
exercising the freedom and responsibility associated with broader
guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and
community. At Castlehill Primary School, staff are challenged and
supported through a range of continuous professional
development and review opportunities gained by working and
learning with a range of colleagues. The school is part of a
leadership structure arrangement in which the Head Teacher is
responsible for three schools Castlehill Primary School,
Drumlemble Primary School and Carradale Primary School. 
There is a Depute Head Teacher and Principal Teacher
appointed to each of the three Primary Schools to support this

Page 30

leadership structure. This structure provides increased
opportunity for collegiate working. Castlehill Primary School is
part of the Kintyre Schools Cluster and MAKI cluster, which
means that staff can be supported to work together, moderation
and tracking of pupil progress is enabled and staff work across
stage appropriate groups. Colleagues within Castlehill Primary
School are able to support and challenge each other on a daily
basis. The whole staff are able to bring a range of talents and
skills to benefit outcomes for learners. 
Castlehill Primary School has been focussing on the development
of Nurture and Rights Respecting Schools approach, both taking
into consideration the incorporation of UNCRC into Scottish law.  
The focus on wellbeing and nurture is evident in activities such as
reflection afternoons for pupils and parents. The impact of these
approaches has been evidenced using SHANNARI webs. 
Castlehill Primary School encourages outdoor learning activities
and learning through play. Partnership working with local
employers and the Parent Council has helped to develop
resources and outdoor learning zones to support this approach.   
Castlehill Primary School is in a central location within
Campbeltown, unlike Southend Primary which is a very remote
rural school. However, as the Head Teacher is responsible for
Carradale Primary and Drumlemble Primary, both of which are
remote rural schools (Scottish Government classification), there
is a strong understanding of the rural communities that the school
serves.   
The school has strong links with Campbeltown Nursery, with
which it coordinates an active transition calendar, and with
Campbeltown Grammar School with which it liaises, alongside
all other South Kintyre schools, throughout the year to ensure a
smooth transition for P7 pupils into S1. 
11.2.2  Outcomes 
Through the GIRFEC practice model, meeting the needs of every
child continues to be a priority and teachers carefully plan and
assess to ensure each child has the opportunity to reach their
potential. Careful tracking and monitoring procedures are in place
to evidence pupil progress. This includes professional dialogue
with teachers, learning discussions with children, classroom
observations, assessment and looking at pupil work. Planning for
Progress meetings are being further strengthened. These
discussions between home and school improve parental
engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively
with other agencies and parents to ensure the needs of each child
are met.

Page 31

In Castlehill Primary, like other schools in the Kintyre area,
standards of attainment have been impacted by the pandemic. 
Whilst most children are achieving national expectations in
reading, writing, listening, talking and numeracy, writing has been
a specific area for development across the school but with a
particular focus on the current P5 and P7 cohorts. Maths
strategies include SEAL for P1-3 and Number Talks for P4-7.
Castlehill Primary continues to develop positive relationships
within the school through a focus on Nurture and Rights
Respecting Schools. A larger staff, parent body and partner group
by nature increases the breadth of talent and interest that may be
available to share within a school setting. This applies both in
terms of the wider curriculum and within aspects of the curriculum
that may be enhanced by staff individual expertise e.g. PE,
language, science, expressive arts teaching. 
11.2.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which
help them develop the knowledge and understanding, skills,
capabilities and attributes which they need for their mental,
emotional, social and physical wellbeing both now and in the
future. Castlehill Primary has been restoring its community links
as part of its Covid Recovery Plans, providing enhanced
opportunities for social interaction and skills development. 
11.2.4  Environment for Learning 
Castlehill Primary School is a suitably-equipped and well
supported school, situated in the town of Campbeltown. The
school building is large and the grounds wrap around the building,
providing ample space for play and outdoor learning. The building
has facilities for pupils and visitors with special access needs. 
11.3.1  Community Impact 
Whilst there was some variance of community views within
Southend, the majority of parents supported closure of the school.  
Suggestions for the building was for this to be retained for an ELC
or used for residential trips or sold to be converted into a bunk
house or youth hostel that would support the local tourist industry. 
There were suggestions that the play equipment could be moved
to benefit the children in the local area. Other suggestions also
included using the grounds for community gardens. Within
Southend there is a Village Hall which houses community events.
Almost all people who attended the Options Appraisal Meeting
strongly stated the school building should be re-purposed and not
allowed to fall in to further disrepair, as that would adversely
impact on the neighbouring property and the visual impact of the

Page 32

village. It is accepted that a school closure may have an adverse
effect on community sustainability, but a change of use could be
an asset to the community. The school premises are situated
within walking distance of the village. If the local plans for the
building progress, this would have a positive impact on the
sustainability of the village. Formal closure of the school would
mean that these plans could potentially be progressed. 
11.3.2  Travel Arrangements 
The travel distance (AA route finder) from Southend Primary to
Castlehill Primary is 8.7 miles via the B842. Travel time is
approximately 14 minutes. The travel arrangements have been in
place for almost two years. Travel is an accepted aspect of living
in the Southend community. Pupils will travel on the existing West
Coast Motors service bus and eventually all the pupils will travel
to Castlehill Primary School. The environmental impact of travel
will be minimal, as these arrangements are currently in place due
to the mothballing of Southend Primary School. The closure of
Southend Primary School, in terms of travel would have a neutral
effect on the environment. There is currently no annual transport
cost for pupils to travel to Castlehill Primary School as the route
was already in place and the use of the existing West Coast
Motors service bus would not incur additional costs in the
immediate future. 
11.4  Assessment of Rural Factors 
The reasons why the future of Southend Primary School is being reviewed are
stated at Section 2 of this report. There is currently no expectation for the pupil
numbers to increase at the School. Southend Primary School is mothballed with
no current pupils. Having considered all the alternatives above, the option to
close Southend Primary School and realign the catchment area for Castlehill
Primary School to include the former Southend Primary School catchment area
is considered the most reasonable means to address the reasons identified at
Section 2 of this report. 
11.5  Financial Impact 
The main elements included within a school budget are Teacher employment
costs (i.e. basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure
incurred by the school (i.e. educational equipment, materials, staff travel, etc.). 
Teacher staffing budgets are calculated on an annual basis and within the
Primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of the pupils in each school. When a school ceases to be operational

Page 33

the Teacher staffing budget is adjusted (at the appropriate time), per entitlement
information from Education HR, with the staffing budget resulting in a nil value. 
As a result of the authority’s policy for no Teacher redundancies it is presumed
that the staff are deployed elsewhere within the authority and therefore their
salary costs still exist with an increase to the receiving school’s budget. This is
also in line with the national priority of maintaining teacher numbers. This
methodology also applies to the school’s discretionary budget which again is
formula based.  The budget of the receiving school, in terms of any pupils being
transferred, will have increased. The figures outlined below take account of the
fact that the staffing and discretionary budgets have been adjusted to nil. 
The annual running costs during mothballing of Southend Primary School are
a total of £5,936. 
Annual savings generated through closing Southend Primary School would be
£5,936. 
The costs/savings outlined above assumes all revenue expenditure would
cease. This includes non-domestic rates, utility costs, insurances, etc. If the
school was to be formally closed, this would allow the council to take steps
towards selling the school premises to a third party or local community groups. 
11.6  Environmental Impact 
Pupils are currently travelling to Castlehill Primary School. However this option
would have a neutral environmental impact on the current position and would
have no impact on the current travel arrangements for staff and pupils. The
journey to Castlehill Primary is a relatively short journey. Travel is an accepted
aspect of rural life. 
12.0  CONCLUSION 
Four alternative options have been reviewed in considering the future of
Southend Primary School. For each option, information was collated and
consideration was given to: 
 Community feedback;
 Pupil numbers; 
 Financial Information;
 Assessment of rural factors, including community impact, economic impact
and travel arrangements, and
 Educational Benefits. 
An authority that is contemplating a rural school closure proposal must satisfy
the preliminary requirements set out in Section 12A of the 2010 Act before
formulating a proposal. 
After consideration of the preliminary requirements, as set out in the Act, and
the options, and having regard to the specific reasons identified at Section 2 of

Page 34

this report, closing Southend Primary School and realigning the catchment
area of Castlehill Primary School to include the current catchment area for
Southend Primary School is put forward as the most reasonable option in
order to address the underlying reasons for the possible proposal. 
Members are asked to: 
 Note the outcome of this consideration of the preliminary requirements; and 
 Agree that Officers now formulate a draft closure proposal that will come
back to a future meeting of the Committee for approval by Members which
would subsequently trigger the formal consultation process under the
Schools (Consultation) (Scotland) Act 2010. 