Democracy Spraffa

Item 14 - Appendix 1

West Dunbartonshire Council · 22 November 2023
Back to Housing & Communities Committee — 22 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1
Scottish Government Ending Homelessness Together Fund
RAPID
REHOUSING
TRANSITION
PLAN
2022/23 Monitoring Report
ITEM 14 -APPENDIX 1

Page 2

2 
Rapid Rehousing Transition Plans Monitoring Report 
In previous years, we have asked all local authorities to provide a written report
detailing how they have spent their allocation of funding including funding carried
over from previous financial years.  For this return we are refocusing on the
outcomes of rapid rehousing transition plan spend and have included four questions
which ask local authorities to provide qualitative information to capture an overview
of rapid rehousing transition plan (RRTP) progress and challenges between 2019-
2023. 
These questions are designed to identify where RRTP funding has improved
outcomes for people experiencing homelessness, to identify best practice and
highlight where more support is needed.  It is a free text return designed to allow
local authorities to capture successes and challenges.  We are also seeking
anonymised case studies of people who have directly benefitted from the
implementation of RRTPs in local authority areas.  This qualitative information will be
used in the consideration of future funding.   
Please complete this report and include it with the latest version of your RRTP for
2022-23 and updated EQIA by 25 August 2023 to:
RapidRehousingTransitionPlansMailbox@gov.scot.

Page 3

3 
Please provide an overview of progress/outcomes since the implementation of your RRTP
including anonymised case studies where helpful to demonstrate outcomes. 
Word guide: approximately 500 words per question. 
Can you describe how implementation of your RRTP has helped prevent
homelessness within your local authority area?
The ring fenced funds allowed for options to be explored and trialled at a quicker pace. 
Which isn’t always the easiest when budgets are limited within Local Authorities.  Being
able to explore options then allowed for monitoring to take place to assess the impact at
preventing homelessness which meant some options were mainstreamed and others we
used as lessons learnt. 
One of the early pilots trialled was made a permanent part of our structure after
assessing the impact was a dedicated prevention role.  We created a temporary
Enhanced Prevention Officer to work and concentrate on section 11 notices.  Previously
this was shared between all caseworkers via the duty service.  The dedicated role seen
greater engagement with our service which ultimately prevented homelessness occurring. 
This role itself also allowed for more options to be trialled to prevent homelessness.  We
were able to create a small prevention fund which then encouraged earlier approaches to
our service for assistance and therefore stopped court action.  Without dedicated funds
this may not have been possible due to continued budget cuts.  53 referrals have
received payment and approximately 50 are all continuing to sustain tenancies. 
CASE STUDY
Received a referral to the prevention fund from a RSL prior to them issuing a section 11
notice for one of their tenants.  Their tenants had a low level arrears balance due to a
change in employment however their arrears began to escalate.  The main earner went
off sick for 6 months only receiving SSP and the partner gave birth prematurely.  This
lead to their arrears increasing to around £2,000 at the time of the referral.  This
household didn’t have knowledge of benefits and entitlements as they were always in
employment.  Through engagement with our Prevention Officer they were assisted with a
DHP claim and helped to update a Universal Credit claim to include housing costs.  They
also received a payment of £400 from the prevention fund for an affordable repayment
plan to be reached for the remainder of the balance and no further action taken on the
tenancy. 
We are also in a pilot process with one of our RSL partners where they are sending
earlier section 11 notices, again to assist with engagement and being able to have more
options available to try to help prevent any evictions from taking place. We are due to
analyse the impacts this can have but early indications show positive impacts. 
Through our Youth Pilot with Action for Children and still having high youth homelessness
in the local authority area we looked at reviewing our allocations policy.  Following
consultation and Committee approval it was agreed to add a youth priority group to our
allocations policy.  The intention behind this is that it will reduce the need for young
people to enter the homeless service to be housed therefore reducing presentations. As
part of this we have a dedicated youth resettlement worker to assist and boost tenancy
sustainment.

Page 4

4 
CASE STUDY
21 Year old female presents for advice, not roofless but lives with mother who has
addiction issues (Aug 22).  Then finds out she is pregnant and can no longer live at her
mothers.  Discuss all housing options; rent deposit, private let and homeless presentation
so can make an informed decision.  Nov 22 Youth priority is rolled out so this option is
then discussed and application updated (18 wks. pregnant).  She is then made an offer
and housed in Feb 23, resettlement assisted with DHP and Community Care Grant. 
Our Housing First service has enabled a 91% tenancy sustainment rate for those who
have been in and out of our homeless service therefore reducing repeat homeless
presentations. 
Can you describe how implementation of your RRTP has helped speed up the
process of rehousing homeless households?
The development and subsequent implementation allowed for discussions with all
partners to begin and be agreed about increased allocations to households experiencing
homelessness.  These discussions were both internally with our colleagues in Housing
Operations and our Registered Social Landlords.  The focus and commitment from the
Scottish Government encourages a more open conversation.  Historically there has
always been a push back to allow more than 45/50% of lets to be allocated to those in
homelessness need. 
The agreed time targets set out in the plan ensured there was both a strategic and
operational focus. New review processes introduced as part of managing an open HL1. 
Cases were reviewed their areas of choice at 30 days, and again at 60 days where more
areas had to be added.  When external factors began to affect void times, new Void
meetings were set up with an action plan to mitigate external impacts affecting void times. 
It helped look at things in different ways to try and speed things up.  For instance looking
at older cases why not on offer and finding solutions such as focusing acquisition
programme to meet a family’s need. 
It ensure all areas offices operated to maximise the use of section 5 by sending to
multiple landlords who had suitable stock for the household and not one at a time.  This
removed waiting 6 weeks between each by the caseworker closely managing offers and
updating relevant landlords quickly. 
New discussions and new perspective on doing things meant our supported
accommodation carried out a review of their timescales of the work we carry out. For
example the review timescale used to be 12 weeks, we have now reduced this to every 6
weeks which has helped up speed up the process for people being put on the housing list
waiting for an offer of housing. 
It helped to break old ways of working.  For instance, young people going into supported
accommodation if they’ve never had a tenancy. It was a practice seen as practical help
but by changing default start positions to always be low need and only work up based on
information and assessment.  Doing this means if more people assessed as low/no
support needs our aim would then to be rapid rehouse. 
Conversions “flipping” were an option prior to RRTP.  What the implementation of our
RRTP helped was make this a more readily available option by having a larger budget to
offer it to more households.  This has helped reduce transitions, and help rehouse some
households quicker than if they had to wait for a ready to let property.

Page 5

5 
CASE STUDY
Single female in her 50s presents in March 2023.  She is made an offer of housing which
is still under repair in June 23.  Following discussions with the caseworker she states she
likes where she is and is happy.  Caseworker speaks to colleagues to establish if it is an
option to convert this temporary unit, and it is confirmed it is.  Further discussions take
place with applicant, housing operations and homeless services to get this moved on as
quickly as possible.  The conversion takes place and the tenancy is converted over to a
SST on 10th July 2023. 
How has implementation of your RRTP affected the numbers of households in
temporary accommodation and the time spent there? 
Table below shows the numbers of households in temporary accommodation in West
Dunbartonshire at the end of each of the first 4 years of RRTP and the average times
spent in the temporary accommodation: 
2019/20 2020/21 2021/22 2022/23
No in temp 264 296 253 285
Avg time  15 wks 19 wks 16.5 wks 17.5 wks 
We were reporting an average of 23 weeks in temporary accommodation before the
implementation of rapid rehousing.  Our aim when the plan was initially written was to
reduce this to 13 weeks by the end of year 5. 
The renewed focus and new initiatives in place managed to make significant progress in
the first year around times in temporary accommodation.  In the second year we began
trying to put focus on older cases which impacted the average times.  There were also
some new builds beginning to be allocated, some of which had delays impacting times. 
Despite this we were still on track in terms of times.  However, the numbers in temporary
accommodation also increased significantly at the end of year as this was the beginning
of the pandemic and lockdown. 
During Year 3 once lockdown restrictions began to be lifted and allocations resumed we
were able to not only reduce numbers but times too. 
However, the external factors impact of Covid19 and then the cost of living crisis began
impacting both numbers and time and continue to do so.  The demand for our prevention
and homeless services began increasing in 2021/22 which in turn led to more requests
for temporary accommodation.   
2018/19 2019/20 2020/21 2021/22 2022/23
Prevent 1 Approaches  178 240 332 576* 455 
*this included 220 Covid19 Tenant Hardship Fund applications 
On top of this the supply of available homes began to reduce.  The cost of living crisis is a
likely reason for a reduction in tenancy terminations in WDC tenancies.  The table shows
the average pre Covid19, during and after: 
2018/19 2019/20 2020/21 2021/22 2022/23
No of terminations 752 654 475 586 477

Page 6

6 
It shows how levels remain very low.  Less people are moving into private rented and
homeownership.  This is likely linked to less people moving into home ownership due to
high mortgage rates. 
The number of new build completions are beginning to reduce, with no completions due
in 2023/24 which would assist to top up available lets. 
We have started to see a rise in larger families present in West Dunbartonshire Council
for homelessness assistance.  With very limited larger family home stock meaning
increased times spent in temporary accommodation and more children in homeless
services.  Although the demand for larger properties have been incorporated into new
builds development none will be ready until 2025.  We are also utilising our increased buy
back budget to focus on suitable larger family homes.  There are currently 11 x families
who require 4/5 bed size property and 6 also have medical needs. 
All of these factors have led to higher numbers in temporary accommodation and longer
times.  Demand has become so great for temporary accommodation that as a local
authority who prided itself on not requiring the use of bed and breakfast, we are now
having to use it to accommodate demand which has led to reporting breaches of
accommodation. 
Is your local authority on track for making the planned transition to rapid
rehousing? If not, what major factors are hindering progress?
During the first three years of the RRTP we were able to meet our reduced target times
and seen increased lets to households experiencing homelessness.  Unfortunately in
year 4 we were unable to meet our target and seen an increase in times.  Factors
highlighted in the above section demonstrate we do have an increased in demand, higher
numbers in temporary accommodation and an increase in times spent in temporary
accommodation.   
As a result, we have had to adjust the target for year 5 but look to improve on current
times. 
Below shows our demand into our homeless service prior to RRTP and to present which
shows the impact external factors are having: 
2018/2019 2019/2020 2020/2021 2021/2022 2022/2023
1038 1022 1053 1203 1202 
If things had remained as they were in the first two years in terms of demand and supply,
and there hadn’t been external factors impacting both then West Dunbartonshire Council
would be on track to a transition of rapid rehousing for those with no to low support
needs. 
We will continue to prevent homelessness as much as possible but current climate
means this becomes more difficult or reduces available housing options for some
households. It is hoped that prevention can assist to reduce demand, however the
decisions and consequences around the cost of living cannot all be mitigated by the
homeless services. 
There are other factors adding to the demand of available social lets. Competing
demands for those available and the reduction of available private lets.

Page 7

7 
The private rented sector, despite demand outstripping supply, is beginning to shrink. 
Many landlords are leaving the sector due to unintended consequences of legislation
brought in to assist with the cost of living crisis such as taxation and rent caps.   
We have also seen additional demands and pressures associated with a wide range of
humanitarian programmes, most recently including the Homes for Ukraine and Scotland
Super Sponsor Schemes.  The Homes for Ukraine was at a scale never seen in Scotland
which has exacerbated the demand for available affordable housing across Scotland,
which ultimately amplifies the demand for the shrinking social housing supply. 
Available supply of properties is a key element to enable rapid rehousing and current
factors are impacting this. 
Times properties are at void stage have been increasing which affects numbers available. 
Some of the issues that are affecting time is the lack of available contractors to carry out
work and issues recruiting internal staff due to high demands for tradespersons.  The
availability of materials or lack of has also led to delays.  Another significant issue is
delays with utilities meters. Some of the issues and months delays in resetting
meters/installing new meters, are all things which mean a new tenant cannot move in. 
This is a nationwide issue. 
CASE STUDY
Single male parent household presents in July 2021.  Made original offer in August 2021
but had to be withdrawn once new medical information provided meant no longer suitable
for the child.  It was then January 2022 before another offer was made due to the needs
of the household.  However, by end of April we are unable to provide a ready for let date
as ongoing meter issues despite the property being ready in January.  Therefore, a
decision was made to convert or “flip” current temporary accommodation to a permanent
tenancy due to multiple delays and limited stock to meet needs of the household. 
While external context continues to impact demand and supply it will continue to be a
challenge to achieve full rapid rehousing in the short term.

Page 8

8 
Details of funding recipient
Local authority West Dunbartonshire Council 
Reporting period 01/04/2022 to 31/03/2023
Reporting officer Claire Mckay 
Position Senior Housing Development Officer 
Date completed 24th August 2023 
Total RRTP funding
carried over from 2021-22 £36,392   
RRTP funding received for
2022-23 £238,000 
RRTP spend 2022-23 £485,159 
Total RRTP funding
carried over to 2023-24 £1,263

Page 9

9 
Housing First
Housing First
tenancies 
Provide a short brief overview of your
progress and any obstacles to
progression of Housing First in your
area. 
We achieved 15 housing first tenancies in Year 4
which is one above our target of 14.  This included
a homeless prevention case where a referral was
accepted to prevent a tenancy ending.
We also carried a further 4 into Year 5 of those who
have been assessed or waiting an offer.
This was not our original target in our plan for year
4, it was 37.  However, due the available funding
we were unable to expand the service any further
to staffing levels from 8 FTE therefore target was
reduced to 14.
As there has been no additional funding secured
we are unable to expand current staff levels which
impacts ability for further housing first tenancies. 
Only one RSL actively offers properties as housing
first tenancies.
Housing First partners 
Provide detail of all Housing First
partners who are supporting the
delivery of Housing First. 
We work with our colleagues in housing services
and some of our registered social landlords in the
area to provide the tenancies.
We work closely with our colleagues in finances
around community care grants to help furnish the
properties.
Bi-monthly we provide updates on our housing first
service to our Alcohol and Drug Partnership.
We have ongoing conversations with colleagues in
HSCP regarding funding.
Allocation spent on
Housing First 2022/23:
£
SG RRTP funding
Local authority
funding Other
238,000 153,109 
Impact of Housing
First:
Any evidence of the impact of
Housing First including
anonymised case studies where
appropriate 
At the end of year 4 we had created 64 tenancies in
total with 50 still active.  This was with 8 “step
downs” and 6 tenancies ending (4 deaths and 2
tenancy/neighbour issues). With only 6 tenancies
ended means we are achieving a 91% tenancy
sustainment rate.  This service has given the
opportunity for those who would previously not
taken or sustained a tenancy before.  This also
means there was no a housing solution for some
cases which have been opened for many years.
For some individuals it has led to addressing other
issues such as mental health or addictions which
wouldn’t have been possible otherwise.
CASE STUDY attached at end of template. 
Future spend planned
on this activity in
2023/24:  £ 
SG RRTP Funding Local Authority
funding Other
241,146 120,000

Page 10

10 
Future plans for
Housing First :
Provide detail of the future of
Housing First delivery in your local
area, including timescales and
progress towards Housing First
being the default option for people
with multiple and complex needs
experiencing homelessness.   
We will be reviewing our Housing First Service
including stakeholders and service user’s
consultation.
We will also be exploring the option of procuring
additional support from third sector to be able to
create more tenancies during Year 5.
We continue to have ongoing conversations with
HSCP partners about long term funding as
homeless services should not and cannot fully fund
the current service let alone expand it.
Understanding further demand but would want to
explore Housing First as a homeless prevention
tool rather than being a homeless solution which
would reduce numbers of new people entering the
homeless service.  To enable this as a default
option requires long-term funding from all partners. 
Housing First Case Study 
C is a single male in his fifties, with addictions spanning 20 years and several
homeless presentations. Was housed in 2016 under homeless priority.  However,
due to his addictions he had poor door management to the point he would allow
other alcohol and drug users in his property sometimes under duress.  Things
escalated to the point where C was assaulted in his own home where he had to stay
in hospital for a month.  On discharge C gave up his tenancy and returned to live
with family. 
Throughout his life he sought support for his dependency and receives support from
Community Addictions Team and been on a methadone programme but at times
also used illicit drugs too. 
In 2019 following the assault, C presented to homeless services again. At this point
Housing First was established therefore the case manager made a referral into the
service.  C was accepted into housing first with the following being identified as his
support needs; current homeless situation, long term addiction support; recovery and
relapse preventions; social isolation; exploitation; mental health and wellbeing;
positive door control. 
C secured a new tenancy late 2019 but the first 2 years remained chaotic in terms of
drugs use and still being exploited by peers.  However, after building trust with his
HF support worker access community-based support networks.  This allowed C to
begin to think about his own personal recovery.  C began to see positive changes. 
Unfortunately, C had another relapse but recognising this this time asked for more
help in form of respite.  Workers linked in and C was given respite for 3 months while
maintaining his tenancy.   
Fast forward to now, C now been abstinence for nearly 4 months of all drugs, he’s
involved with Scottish Drug Forum as a volunteer, is addressing all debts and now
has a positive door control.  He also recently fully decorated his property.