Democracy Spraffa

Document Pack (Bookmarked) HAC Committee 22 11 23

West Dunbartonshire Council · 22 November 2023
Back to Housing & Communities Committee — 22 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda
Housing and Communities
Committee
Date:  Wednesday, 22 November 2023
___________________________________________________________________
Time:  10:00 
___________________________________________________________________
Format:  Hybrid Meeting
___________________________________________________________________
Contact: Email: nicola.moorcroft@west-dunbarton.gov.uk     
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Housing and Communities Committee as detailed
above.
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton, G82 1QL.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Ian Dickson 
Councillor Gurpreet Singh Johal (Chair)
Councillor David McBride
Councillor Jonathan McColl
Councillor Michelle McGinty
Councillor Jim McElhill
Councillor John Millar 
Councillor Lawrence O’Neill
Councillor Lauren Oxley 
Councillor Martin Rooney
Councillor Hazel Sorrell (Vice Chair)
Councillor Sophie Traynor
All other Councillors for information
Chief Executive
Chief Officer – Housing and Employability
Chief Officer – Regulation and Regeneration
Date issued: 9 November 2023
Audio Streaming
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site.
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/
Page 2

Page 3

HOUSING AND COMMUNITIES COMMITTEE
WEDNESDAY, 22 NOVEMBER 2023
AGENDA
1 STATEMENT BY CHAIR – AUDIO STREAMING
The Chair will be heard in connection with the above.
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record.
5 OPEN FORU.M
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
6 MINUTES OF PREVIOUS MEETINGS 7 - 13
Submit for approval, as correct records, the following Minutes of Meetings of
the Housing and Communities Committee: 
(a) Ordinary meeting – 23 August; and
(b) Special meeting – 25 October 2023.
7    SCRUTINY REPORTS
(A) POLICE SCRUTINY REPORT     15 - 25
Submit report by the Divisional Commander, Police Scotland providing
Members with an update for Quarter 2 (April – September 2023) on
local policing in West Dunbartonshire.
Page 3

Page 4

(B) FIRE AND RESCUE SCRUTINY REPORT            27 - 36
Submit report by the Local Senior Officer, Scottish Fire and Rescue
Service providing and update on Quarter 2 performance data measured
against priorities in the West Dunbartonshire Local Fire and Rescue
Plan.
8 HOUSING AND EMPLOYABILITY DELIVERY PLAN 2023/24 37 - 65
MID-YEAR REPORT
Submit report by the Chief Officer, Housing and Employability, providing the
Housing and Employability Delivery Plan for 2023/24 mid-year progress
report.
9 MORE HOMES WEST DUNBARTONSHIRE - WEST    67 - 77
DUNBARTONSHIRE COUNCIL AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME 
Submit report by the Chief Officer – Housing and Employability providing
an update on progress with West Dunbartonshire’s More Homes Programme,
which oversees the delivery of the Council’s new home building programme.
10 SCOTTISH SOCIAL HOUSING CHARTER/REGULATION 79 - 86
OF SOCIAL HOUSING IN SCOTLAND, UPDATE
REPORT
Submit report by the Chief Officer – Housing and Employability providing a
mid-year update in terms of how the Council is performing against the Scottish
Social Housing Charter indicators and an update into how the Council is
meeting the requirements of the Scottish Housing Regulator’s Regulatory
Framework.
11 LOCAL HOUSING STRATEGY 2022-27 ANNUAL  87 - 97
PROGRESS REPORT
Submit report by the Chief Officer – Housing and Employability providing 
a progress report on the West Dunbartonshire Local Housing Strategy 2022 –
2027.
12/
Page 4

Page 5

12 STRATEGIC HOUSING INVESTMENT PLAN     99 - 130
2024/25 - 2028/29
Submit report by the Chief Officer – Housing and Employability seeking
approval for the More Homes West Dunbartonshire Strategic Housing
Investment Plan (SHIP) for 2024/25 – 2028/29 which requires to be submitted
to the Scottish Government.
13 REVIEW OF WEST DUNBARTONSHIRE AFFORDALE 131 - 174
HOUSING DESIGN STANDARD
Submit report by the Chief Officer – Housing and Employability seeking
approval for a revision to the current West Dunbartonshire Design Standard
for Housing Supported by the Affordable Housing Supply Programme, which
has been in place since April 2019, to improve the quality of new affordable
homes being built in West Dunbartonshire.
14 HOME AT THE HEART 2019-24 - WEST DUNBARTONSHIRE’S   175 - 195
RAPID RE-HOUSING TRANSITION PLAN UPDATE AND NEW
APPROACHES TO HOMELESSNESS PROGRESS REPORT
Submit report by the Chief Officer – Housing and Employability providing an
update on “Home at the Heart” – West Dunbartonshire’s Rapid Re-housing
Transition Plan (RRTP) for the period 2019-24 and new approaches to
homelessness.
15 HOUSING REVENUE ACCOUNT BUDGET CONTROL 197 - 216
REPORT 2023/24 TO 31 AUGUST (PERIOD 5)
Submit report by the Chief Officer – Resources providing an update on the
financial performance to 31 August 2023 (Period 5) of the HRA revenue and
capital budgets for 2023/24.
16  GENERAL FUND HOUSING AND COMMUNITIES FINANCIAL      217 - 226
REPORT 2023/24 PERIOD 5 (31 AUGUST 2023)
Submit report by the Chief Officer – Resources providing an update on the
financial performance to 31 August 2023 (Period 5) of General Fund services
under the auspices of the Housing and Communities Committee.
Page 5

Page 6

Page 6

Page 7

HOUSING AND COMMUNITIES COMMITTEE
At a Hybrid Meeting of the Housing and Communities Committee held in the Civic
Space, 16 Church Street, Dumbarton on Wednesday, 23 August 2023 at 10.00 a.m.
Present: Councillors Ian Dickson, Gurpreet Singh Johal, David McBride,
Jonathan McColl, James McElhill, Michelle McGinty, Lawrence
O’Neill, Lauren Oxley, Martin Rooney, Hazel Sorrell and Sophie
Traynor.
Attending: Angela Wilson, Chief Officer – Supply, Distribution and Property;
John Kerr, Housing Development and Homelessness Manager;
Nicola Pettigrew, Housing Operations Manager; Alan Young,
Housing Asset and Investment Manager; Janice Rainey,
Business Unit Finance Partner; Nigel Ettles, Legal Officer;
Nicola Moorcroft and Ashley MacIntyre, Committee Officers.
Also Attending: Chief Superintendent Lynn Ratcliff and Chief Inspector Ryan
McMurdo, Police Scotland; Group Commander Greg
McKearney, Argyll and Bute, East and West Dunbartonshire,
Scottish Fire and Rescue Service.
Apology: An apology for absence was intimated on behalf of Councillor
John Millar.
Councillor Gurpreet Singh Johal in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor Singh Johal, Chair, advised that the meeting was being audio streamed
and broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
RECORDING OF VOTES
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record.
ITEM 6a
Page 7

Page 8

OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of the Meeting of the Housing and Communities Committee held on 3
May 2023 were submitted and approved as a correct record. 
SCRUTINY REPORTS 
(A) POLICE SCRUTINY REPORT 
A report was submitted by the Divisional Commander, Police Scotland
providing Members with an update for Quarter 1 on local policing in West
Dunbartonshire. 
After discussion and having heard the Chief Superintendent and Chief
Inspector in answer to Members’ questions, the Committee agreed to note the
update provided for Quarter 1. 
(B) FIRE AND RESCUE SCRUTINY REPORT 
A report was submitted by the Local Senior Officer, Scottish Fire and Rescue
Service providing and update on Quarter 1 performance data measured
against priorities in the West Dunbartonshire Local Fire and Rescue Plan. 
After discussion and having heard the Group Commander in answer to
Members’ questions, the Committee agreed to note the update provided for
Quarter 1. 
MORE HOMES WEST DUNBARTONSHIRE - WEST DUNBARTONSHIRE
COUNCIL AFFORDABLE HOUSING SUPPLY DELIVERY PROGRAMME 
A report was submitted by the Chief Officer – Housing and Employability providing
an update on progress with West Dunbartonshire’s More Homes Programme, which
oversees the delivery of the Council’s new home building programme. 
After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the contents of the report and the progress made to date, in the
delivery of the Council’s More Homes West Dunbartonshire approach; and 
Page 8

Page 9

(2) to note the revised Affordable Housing Supply Programme benchmark
assumptions outlined in paragraph 6.2 of the report. 
SCOTTISH SOCIAL HOUSING CHARTER/REGULATION OF SOCIAL HOUSING
IN SCOTLAND, ANNUAL UPDATE REPORT 
A report was submitted by the Chief Officer – Housing and Employability providing
an annual progress report on meeting the requirements of the Scottish Social
Housing Charter and the Scottish Housing Regulator’s Regulatory Framework for
Social Housing. 
After discussion and having heard the Housing Development and Homelessness
Manager, the Housing Operations Manager and the Housing Asset and Investment
Manager in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the contents of the report recognising the ongoing legacy impact the
pandemic had on 2022/23 performance and the key areas of focus for the
Housing Improvement Board (HIB) during 2023/24 outlined at paragraph 4.8
of the report; and 
(2) that a further progress report on the Scottish Social Housing Charter be
submitted to the November 2023 meeting of the Housing and Communities
Committee. The report would include detailed benchmarking performance
information against all local authorities in Scotland highlighting the impacts of
the pandemic on housing and homelessness services across Scotland. 
ENHANCED HOUSING CAPITAL INVESTMENT PROGRAMME BETTER HOMES
WEST DUNBARTONSHIRE 
A report was submitted by the Chief Officer – Housing and Employability providing
an update on the work of the Tenant/Officer Task and Finish Group, having agreed a
revised spending profile to deliver an additional £30m of investment in Council
homes over the next five year, following the decision taken by West Dunbartonshire
Council to a weekly rent increase of 5% in 2023/24. 
After discussion and having heard the Chief Officer – Supply, Distribution and
Property and the Housing Development and Homelessness Manager in further
explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the contents of the report and the progress made to date, in the
delivery of the Council’s ambitions around housing investment; 
(2) to note the work of the Tenant/Officer Short Life Task and Finish Group in
developing an Enhanced Housing Capital Investment Programme, in
particular the role of the tenant representatives: and 
Page 9

Page 10

(3)  to approve the Enhanced Housing Capital Investment Programme and
delegated authority to the Chief Officer – Housing and Employability to deliver
this Programme within the wider Housing Capital Investment Programme. 
‘INVOLVING YOU’ WEST DUNBARTONSHIRE COUNCIL’S TENANT
PARTICIPATION STRATEGY 2021-24 ANNUAL PROGRESS REPORT“ 
A report was submitted by the Chief Officer – Housing and Employability providing
an annual progress report on the implementation of “Involving You”, West
Dunbartonshire Council’s Tenant Participation Strategy covering the period 2021-24. 
After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed to note the progress and achievements made, in relation to the
implementation of the second year of the strategy’s action plan, including the key
role played by tenants and tenant representatives in improving housing services in
West Dunbartonshire. 
NOMINATIONS AGREEMENT WITH VETERANS HOUSING SCOTLAND 
A report was submitted by the Chief Officer – Housing and Employability seeking
agreement to enter into a new Nomination Agreement with Veterans Housing
Scotland and West Dunbartonshire Council to provide two Council properties
specifically for veterans, on an annual basis. 
After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed to the proposed nominations agreement with Veterans Housing Scotland in
Appendix 1 of the report. 
PROGRESS TO RE-LET EMPTY COUNCIL HOUSE PROPERTIES 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing an update on progress to improve the approach to re-let of empty council
house properties. 
After discussion and having heard the Chief Officer – Supply, Distribution and
Property in further explanation and in answer to Members’ questions, the Committee
agreed to note the contents of the report. 
HOUSING REVENUE ACCOUNT BUDGET CONTROL REPORT 2023/24 TO 30
JUNE (PERIOD 3) 
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 30 June 2023 (Period 3) of the HRA revenue and capital
budgets for 2023/24.
Page 10

Page 11

After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the revenue analysis showed projected adverse variances of £1.021m
which would be offset by a reduction to the contribution from revenue to
capital (CFCR) netting a revenue break even position; and 
(2) to note the net projected annual position in relation to the capital plan
highlights an in-year adverse variance of £1.550m (1.24%) as detailed in
Appendix 4 of the report. 
GENERAL FUND HOUSING AND COMMUNITIES FINANCIAL REPORT 2023/24
PERIOD 3 (30 JUNE 2023) 
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 30 June 2023 (Period 3) of General Fund for services under
the auspices of the Housing and Communities Committee. 
After discussion and having heard the Housing Development and Homelessness
Manager and the Business Unit Finance Partner, in further explanation and in
answer to Members’ questions, the Committee agreed:- 
(1) to note the contents of the report which showed the revenue budget forecast
to overspend against budget by £0.033m (1%) at the year-end; 
(2) to note the net projected annual position in relation to relevant capital projects
shows no projected variance; and 
(3) to note the progress on efficiencies incorporated into budgets for 2023/24. 
VALEDICTORY
ANGELA WILSON, CHIEF OFFICER – SUPPLY, DISTRIBUTION AND
PROPERTY 
Councillor Johal Singh advised that this was the last meeting of the Housing and
Communities Committee that Angela Wilson, Chief Officer – Supply, Distribution and
Property would be attending, as she would be leaving Council service in September.
On behalf of all Members of the Committee, he thanked Ms. Wilson for her
outstanding service, work and commitment to making West Dunbartonshire a better
place to live and wished her well for the future 
In response, Ms. Wilson thanked everyone for their kind words and noted thanks to
all current and past Members of the Housing and Communities Committee for their
leadership and support. 
The meeting closed at 12.44 p.m.
Page 11

Page 12

HOUSING AND COMMUNITIES COMMITTEE
At a Special Hybrid Meeting of the Housing and Communities Committee held in the
Civic Space, 16 Church Street, Dumbarton on Wednesday, 25 October 2023 at 
2.30 p.m.
Present: Councillors Ian Dickson, Gurpreet Singh Johal, Jonathan
McColl, Michelle McGinty, John Millar, Lawrence O’Neill, Lauren
Oxley, Martin Rooney, Hazel Sorrell and Sophie Traynor.
Attending: Peter Barry – Chief Officer, Housing and Employability; Alan
Douglas – Chief Officer, Regulatory and Regeneration; John
Kerr, Housing Development and Homelessness Manager;
Nicola Pettigrew, Housing Operations Manager; Alan Young,
Housing Asset and Investment Manager; Nigel Ettles, Legal
Officer; Nicola Moorcroft and Ashley MacIntyre, Committee
Officers.
Apologies: Apologies for absence were intimated on behalf of Councillors
David McBride and James McElhill.
Councillor Gurpreet Singh Johal in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor Singh Johal, Chair, advised that the meeting was being audio streamed
and broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in the item of business on the
agenda.
RECORDING OF VOTES
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record.
ITEM 6b
Page 12

Page 13

SCOTTISH SOCIAL HOUSING CHARTER – WEST DUNBARTONSHIRE
COUNCIL ANNUAL ASSURANCE STATEMENT 
A report was submitted by the Chief Officer – Housing and Employability, providing
benchmarking information relating to how the Council has performed against the
Scottish Social Housing Charter indicators and an update into how the Council is
meeting the requirements of the Scottish Housing Regulator’s Regulatory
Framework including approving the Council’s Annual Assurance Statement. 
After discussion and having heard the Chief Officer – Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed:- 
(1) to note the contents of the report recognising the ongoing legacy impacts the
pandemic continued to have on 2022/23 performance; 
(2) to approve the Council’s Annual Assurance Statement, which would be signed
by the Housing and Communities Committee Convener on behalf of the
Housing and Communities Committee and submitted to the Scottish Housing
Regulator as per regulatory requirements; 
(3) to note that a Charter Improvement Plan had been developed based on a
comprehensive assessment of performance which had informed the
production of the Council’s Annual Charter Performance Report; and 
(4) to note that a further progress report on the Scottish Social Housing Charter
would be submitted to the November 2023 meeting of the Housing and
Communities Committee. 
The meeting closed at 3.49 p.m.
Page 13

Page 14

Page 14

Page 15

OFFICIAL
OFFICIAL
West Dunbartonshire
Performance Summary Report
Reporting Period: Q2 – April to September 2023
Total Crime 405 Crimes
Incidents
Recorded
Overall Dishonesty Domestic Abuse
Incidents
+1.5% +25.8% +10.2%
0% -13.8% +88.9%*
Road Deaths and
Serious Injuries
+1%*
Sexual Crime
+1626*PYTD, -742*5YR
AVG
+9*PYTD, +109*5YR
AVG
+200*PYTD, +189*5YR
AVG
+65*PYTD, +21*5YR
AVG
No change*PYTD, +9*5YR
AVG
-15*PYTD, -11*5YR AVG +8*on PYTD +22*PYTD
Violent Crime
Missing People Counter Terrorism
+7*PYTD
+4%*
+8*PYTD, +6*5YR
AVG
Common Assault
+9.9%
Housebreaking
Disorder 
Complaints
The National Terrorism Threat level is
SUBSTANTIAL
This means that an attack is likely.
*PYTD = Previous Year to Date
*5YR = 5 year average
+8.3%
+12.5%
ITEM 7a
Page 15

Page 16

OFFICIAL
OFFICIAL  
SECTION PAGE NUMBER 
Introduction 2 
Executive Summary 3
Demand Analysis 4
Acquisitive Crime 5
Public Protection 6
Road Safety 7
Serious Organised Crime 8
Violence  9
Antisocial Behaviour 10
Public Confidence - Complaints & Allegations 11
Introduction 
I am pleased to present this performance summary report to the West Dunbartonshire Housing
Committee for its information and consideration. The Reporting Period for this report is cumulative for
Quarters 1 and 2 of 2023, with figures being shown from 1st April 2023 through to 30th September 2023. 
Please note that all data included in this report are management information and not official statistics.
All data are sourced from Police Scotland internal systems and are correct as of date of publication.
Unless stated otherwise numerical comparisons are against the previous year to date and the previous
five year average for the same data period specified. 
Crimes and offences are grouped under recognised categories for statistical purposes.  The Scottish
Government defines these categories, as follows: 
Group 1 - Non Sexual Crimes of Violence  Group 6 - Miscellaneous Offences 
Group 2 - Sexual Crimes  Group 7 - Offences relating to motor vehicles 
Group 3 - Crimes of Dishonesty  PYTD  - Previous Year to Date 
Group 4 - Fire Raising, Malicious Mischief  CYTD - Current Year to Date 
Group 5 - Other (pro activity) Crimes   
Page 16

Page 17

OFFICIAL
OFFICIAL 
PRIORITY
AREA EXECUTIVE SUMMARY 
Acquisitive
Crime 
At the end of Quarter 2, acquisitive crimes show an increase of 200 crimes
compared to the same period last year. This is largely due to notable increases
in shoplifting, vehicle crime and common theft.   
Financial Harm remains on the current work plan for Adult Support and
Protection within West Dunbartonshire. Our Locality Policing Teams regularly
liaise with banking staff to provide advice and respond to reported incidents of
fraud. As a result strong partnerships are in place with early alert mechanisms. 
Public
Protection 
Group 2 sexual crimes have seen a reduction of 13.8% with 94 crimes recorded
compared to 109 at the end of Quarter 2 last year. The number of recorded
crimes of Rape have decreased from 21 to 18, while the number of sexual
assaults recorded has remained unchanged, consistent year on year.   
We have continued focus on gender based violence and sexual offending
ensuring we are prioritising the safety of victims by maximising partnership
working opportunities.   
Road Safety
& Road Crime
The number of fatal road traffic collisions within West Dunbartonshire remains
unchanged from the same period last year with 1 fatality recorded during the
reporting period. 
Road traffic collisions involving serious injuries have increased from 8 to 16,
while collisions involving slight injuries have seen a reduction from 19 to 16. 
Serious
Organised
Crime 
At the end of Quarter 2, both drugs supply and possession charges have
increased from 39 to 50 and 310 to 339 respectively. 
Across Argyll & West Dunbartonshire 20 persons linked to serious and organised
crime (SAOC) have been arrested and £131,113 seized under the Proceeds of
Crime Act 2002 (POCA) 
Violence &
ASB
At the end of Quarter 2, Group 1 crimes of violence have remained consistent
compared to the previous year to date. Anti-social behaviour (ASB) related
crimes have seen a reduction from 1436 to 1335 (-7%) 
We continue to prioritise Violence and ASB and we are engaging with our
partners to ensure that we can respond effectively to emerging trends. 
1. Acquisitive Crime
2. Public Protection
3. Road Safety & Road Crime
4. Serious Organised Crime   
5. Violence & Anti-social behaviour 
WEST DUNBARTONSHIRE POLICING PRIORITIES 2023-2026
Page 17

Page 18

OFFICIAL
OFFICIAL 
CRIME PYTD CYTD INCIDENTS PYTD CYTD
Total Crimes &
Offences 4909 5314 Total number of 
incidents 12,957 14,583
DEMAND ANALYSIS - * PYTD - PREVIOUS YEAR TO DATE CYTD - CURRENT YEAR TO DATE
* *
*
*
The total volume of crimes and offences recorded within West Dunbartonshire has increased by
8.3% from the previous year and is currently 8% above the previous 5 year average. The overall
rise in crime levels is largely due to a substantial increase in acquisitive crimes (+25.8%) followed
by offences relating to motor vehicles.  Police proactive crimes such as weapon carrying and drug
offences have also increased. Both acquisitive and driving offences have also seen notable
increases on the 5 year average. 
Group 1 crimes of violence have remained consistent compared to the previous year. Group 2
sexual crimes and miscellaneous offences have seen an overall reduction of 13.8% and 7%
respectively and remain below the 5 year average.
Page 18

Page 19

OFFICIAL
OFFICIAL   
ACQUISITIVE CRIME
Shoplifting crimes have seen the highest increase (234 to 342) and remain above the
previous 5 year average. Year to date there have been 44 more shoplifting crimes that
have been detected. This is a national picture which may be increasing as a result of
the cost of living. 
At the end of Quarter 2, domestic housebreakings have increased slightly by 8 year to
date.  Housebreakings at commercial properties have seen a reduction and are down
by 12 crimes. 
There has been an increase in motor vehicle crimes with 101 recorded compared to 52
last year. Thefts from motor vehicles have the highest increase (24 to 71). Theft of motor
vehicles has also risen from 28 to 30. Much of the increase in these thefts are attributed
to one repeat offender who has subsequently been arrested and remanded in custody.
The detection rate for vehicle crimes has increased from 30.8% to 60.4%. 
Common thefts have seen an increase from 228 to 270, while fraud crimes have seen
a reduction from 129 to 111. Both figures remain above the 5 year average.
The impact of the cost of living is impacting on the increased volume of acquisitive crime within
our local communities. Our town centre based community officers continue to engage with
local retailers to provide support and a visible presence to deter criminality. This upward
trajectory is very much in line with a national rise in retail related acquisitive crime. We continue
to focus on those retailers most affected, providing prevention advice and guidance. We also
ensure our officers are fully aware of local support networks which allows us to signpost
vulnerable individuals for support. 
As we move forward our Festive Safety Campaign will include additional support for our
retailers as well as scam prevention sessions to local vulnerable groups 
A number of successful arrests have been made whose criminal activity account for a number
of acquisitive crime offences. These included an individual charged with 25 separate car crime
offences in Bonhill and Alexandria and an individual charged with 13 theft by shoplifting
offences from a retail premises in Balloch. The courts and police are bound by the Lord
Advocates guidelines in relation to the presumption of liberty for offenders.  This reduces the
likelihood of custodial sentences, however, we do pursue bail conditions and in some cases
have secured custodial remands form the court to reduce harm in the community. 
Page 19

Page 20

OFFICIAL
OFFICIAL   
We are upskilling our staff ensuring they are able to deliver a victim centred approach to gender
based violence. We are introducing domestic abuse champions to ensure officers are
confident, supported and properly equipped with skills and guidance when dealing with these
often serious and complex investigations. Bespoke perpetrator management plans have been
introduced to robustly police those offenders posing the greatest risk of harm in a domestic
setting. These plans complement our existing safeguarding processes for victims and children
at risk of domestic abuse.   
We continue to support potential victims of human trafficking by carrying out local and national
investigations. We work closely with partners to ensure victims receive emotional and practical
support within our communities. Every effort is made to capture and consider threat, risk and
harm bespoke to each individual and to establish if any criminality has occurred. 
At the end of Quarter 2, Group 2 crimes show an overall reduction of 13.8% compared to the same
period last year. Rape crimes have reduced from 21 to 18, while sexual assaults have remained
almost unchanged. 
The number of domestic abuse incidents reported to the police has risen by 10.2% however the total
number of domestic related crimes recorded has reduced by 2.5% YTD. 
Approximately 88% of rape crimes occurred in a private place with 82% committed by persons
known to the victim. Similarly, around 70% of sexual assaults occurred in a private place with 89%
committed by persons known to the victim. Just over half of all sexual assaults during this reporting
period are non-recent reports. The detection rate for rape crime has increased by 39.7% and is
currently 77.8%, while the detection rate for sexual assaults has reduced from 79.4% to 51.4% year
on year. 
Crimes relating to indecent images/communications have also seen a reduction with almost 33%
being committed by persons known to the victim.  
A total of 181 missing person reports have been recorded by the end of Quarter 2, which is a slight
increase from last year. Adult missing person reports have increased slightly from 67 to 76, while
reports relating to children have remained fairly consistent. 
PUBLIC PROTECTION
Page 20

Page 21

OFFICIAL
OFFICIAL 
Across the reporting period, there has been 1 road death in West Dunbartonshire.
Serious injuries have doubled from 8 to 16 while slight injuries have reduced slightly. 
Offences relating to motor vehicles have increased by 10.7% (an increase of 143 offences)
compared to the previous year. Much of the increase is due to notable rises in insurance offences
(+57), neglecting traffic directions (+25), using a motor vehicle without a test certificate (+24) and
careless driving (+19) which have all been proactively detected. 
Road Traffic Casualties 2022/23 2023/24 
Number of persons killed on our roads 1 1
Number of persons seriously injured 8 16
Number of persons slightly injured 19 16
Number of children seriously injured 0 0
Throughout Quarter 2, we have engaged in positive partnership working between Roads
Policing and the Driver & Vehicle Standards Agency. Our focus was on improving road safety
within our communities, with a particular focus on protecting vulnerable road users. 
A series of Safe Towing videos have been produced and shared via our social media following
a change in legislation around driving licence requirements. This helps people better
understand legal towing limits, hitching, unhitching and safety checks. 
A local Partnership Approach to Road Safety is being formed. This group will focus on locations
of concern and key contributing factors from road traffic collisions where someone has been
killed or seriously injured to enable us to prioritise education and enforcement towards key
locations and demographics. 
We have continued to maximise our visibility on the trunk roads with our focus on speed
detection and driver behaviour being the primary activities. We are also planning our festive
road safety campaigns to ensure that we are prepared for the increase in road users across
our communities during the festive period.   
ROAD SAFETY AND ROAD CRIME
Page 21

Page 22

OFFICIAL
OFFICIAL 
Across Argyll & West Dunbartonshire, 20 persons linked to serious and organised crime have been
arrested and £131,133 has been seized under POCA since 1st April 2023.  
At the end of Quarter 2, drug supply charges have increased from 39 to 50 crimes, which is slightly
below the previous 5 year average. Similarly, drug possession charges have increased from 310 to
339. Both figures are testament to the proactive work being carried out by officers. 
West Dunbartonshire benefits from a dedicated Pro-active Serious and Organised Crime Team
(SOCT). These specialist officers are supported by dedicated intelligence officers in tackling
serious and organised crime in our communities. 
The work of the SOCT and the continued upturn in detection rates of those involved in the supply
of controlled drugs in our communities, is underpinned by the valuable work undertaken by our
Local Policing Teams (LPT), providing the local connection to target drug dealing, developing
local intelligence and progress concerns identified by members of the community. 
The LPT is focussed on emerging risks, patterns and concerns, many of which are also raised
by elected members. Notable recoveries are often shared on our social media platforms to
ensure the community knows when we detect those responsible for the supply of controlled
drugs. 
In a recent and ongoing investigation in Clydebank, vast quantities of Heroin and Cocaine were
seized from a property the street value of which is estimated to be close to £1,000,000. 
The increase in drug supply charges in the second quarter reflect the significant work ongoing to
target those offenders who are involved in serious and organised crime in the sale and supply of
controlled drugs. We remain responsive to information and intelligence relating to drug supply
developing this into enforcement action by our SOCT. 
SERIOUS & ORGANISED CRIME
Page 22

Page 23

OFFICIAL
OFFICIAL   
VIOLENCE 
Violent crime continues to be closely monitored and reviewed with investigations being
resourced across Local Policing Teams and the Criminal Investigation Department. Each crime
is subject of daily review and scrutiny and thereafter allocated to the most appropriate
department to progress to assist in identification of repeat victims, offenders and locations.   Any
emerging issues and risks are shared and appropriate actions identified. 
An example of that is our robbery profile where we have prioritised the disruption of known
violent offenders to impact on this trend. We created a short-term team to focus on analytical
and intelligence led data targeting known violent offenders within our communities. Intelligence
led stop search and a focus on those with outstanding warrants has led to the arrest of 20
individuals in the last quarter. This focused approach has allowed us to provide a proportionate
response to a rising concern. 
Levels of violence in West Dunbartonshire have remained unchanged.  55% of all crimes took
place in a private place, and 53% of those in a public space were committed by persons known
to the victim. Whilst we continue to prioritise violence prevention strategies, sporadic violence
taking place behind doors or between individuals known to each other is challenging to prevent.   
Threats and extortion offences show the highest increase (+8). This is due to a rise in
“sextortion” offences with around 93% being committed online involving threats to post indecent
images shared between victims and suspects. Many of these offences are committed out with
the country reducing the investigative opportunities available. 
There has been an increase in attempted murders (from 0 to 5) and robberies (from 10 to 16)
compared to last year. Three of five attempted murders occurred within public space and two
in private places. It is important to note that all attempted murders were committed by persons
known to the victim (1 domestic related). The 5 attempted murders have been detected. 
Nine of the 16 robberies occurred in a public place (7 on a public street, 1 in a commercial store
and 1 on public transport). The other 7 crimes occurred in private places. Nine robberies were
committed by strangers and 7 were committed by persons known to the victim. The detection
rate for robbery has reduced from 80% to 50%. 
Page 23

Page 24

OFFICIAL
OFFICIAL 
Across the recording period the number of ASB related calls to Policing Scotland has increased
by 1%. Group 6 crimes, which include ASB related offences have seen a reduction of 7% from
1436 to 1335. Common assaults have increased slightly from 494 to 501. 
Approximately 53% of crimes occurred in public spaces and 47% in private spaces. In 56% of
public space crimes, offenders were known to victims.  The detection rate for common assaults
overall has reduced by 36 crimes (a reduction of 7%).     
ANTI-SOCIAL BEHAVIOUR 
We continue to deploy bespoke local policing plans in response to emerging concerns and
ASB complaints. We have built up great partnership working relationships with a host of
agencies who offer support to maximise our response. We have introduced a new parent alert
letter scheme where we are highlighting local concerns to the parents or guardians of those
young persons who are found to be in ASB hot spots.    
Chalmers Street, Clydebank is an example of our ongoing partnership approach to resolving
community concern. A multi-agency action plan was deployed. As a result of direct and indirect
police and partner tactics twelve individuals were identified as being responsible for the
disorder, and we are engaging with partners and the criminal justice process to ensure those
involved are aware of their behaviour and impact on the local community. 
Our Wilful Fire Raising Partnership which includes the SFRS, Education and the Anti-Social
Behaviour Team continues to engage with the local community, deliver educational inputs,
provide crime prevention advice and highlight the dangers and consequences of fire-raising.
Since the establishment of this group, there has been a 33% year on year reduction in wilful
fire raisings and the group has been recognised as best practice by the Scottish Community
Safety Network. 
Page 24

Page 25

OFFICIAL
OFFICIAL 
PUBLIC CONFIDENCE: COMPLAINTS & USER SATISFACTION
Overall satisfaction with Police Scotland
User Satisfaction results show that locally, public confidence levels remain high with overall
satisfaction levels at 70.5%, which is in line with the position in 2022/23. 
At the end of Quarter 2, 71 complaints against the police had been recorded within West
Dunbartonshire which is a marginal increase from 68 last year. The number of allegations
against officers has reduced year on year from 134 to 125. 
Total of 
322
responses
The Emergency Services day in Levengrove Park was a resounding success. Prior to
the event, we engaged with local primary schools with the pupils designing the poster to
promote the event. The winner was selected from St. Michaels Primary School in
Dumbarton. This helps us break down barriers with younger people in our communities.
On the day, the local community came out in vast numbers to support this. The event
provided many partnership organisations the opportunity to speak to the community and
explain how they can support them as well as passing on community safety advice.
From a local policing perspective it allowed us the opportunity to engage with our
communities in an informal way. 
Chief Inspector Ryan McMurdo retains
an overview of all local policing activity
in West Dunbartonshire as Local Area
Commander. 
We have also welcomed a further 14
new probationers to Argyll & West
Dunbartonshire Policing Division. 
We are delighted that one of our Special
Constables was recognised recently at
the Scottish Woman’s Development
forum as Special Constable of the Year.
Our volunteer officers continue to
support local policing, keeping local
communities safe.   
Page 25

Page 26

Page 26

Page 27

WestDunbartonshire PerformanceReport
Q2 - 1st July 2023 - 30th September 2023
Annick
ITEM 7b
Page 27

Page 28

West Dunbartonshire Performance Report
Table of Contents
Local Fire and Rescue Service Plan Priorities 3
WestDunbartonshire Activity Summary   4
Domestic Safety - Accidental Dwelling Fires 5
Domestic Safety - Accidental Dwelling Fire Casualties 6
Unintentional Injury and Harm          7
Deliberate Fire Setting        8
Non-Domestic Fire Safety        9
Unwanted Fire Alarm Signals        10
2Page 28

Page 29

8 0 1 11 2 11
8 0 1 13 1 16
2 0 1 9 0 5
3 0 2 3 1 3
7 1 0 12 1 6
1 0 0 8 2 12
29 1 5 56 7 53
12% -50% -44% -40% 17% -48%
8% -17% -19% -11% 11% -9%
1% 13% 11% 16% 28% 12%
Accidental
Dwelling
Fires
Accidental
Dwelling Fire
Casualties
Non-
Domestic 
Fire Safety
Unwanted
Fire Alarm
Signals
Unintentional
Injury and Harm
Deliberate
Fire Setting
Local Fire and Rescue Service Plan Priorities
Year on Year Change
3 Year Average Change
5 Year Average Change
Clydebank Central
Clydebank Waterfront
Dumbarton
Kilpatrick
Leven
Lomond
Total Incidents
The Local Fire and Rescue Service Plan has been developed to set out the priorities and objectives withinWest
Dunbartonshireand allows our local authority partners to scrutinise the performance outcomes of these priorities.       
We will continue to work closely with our partners in West Dunbartonshire to ensure we are all “Working Together for a
Safer Scotland” through targeting risks to our communities at a local level.
The plan has been developed to complement key partnership activity embedded across West Dunbartonshire`sCommunity
Plan and associated Delivery and Thematic plans. Through partnership working we will seek to deliver continuous
improvement in our performance and effective service delivery in our area of operations.
The Local Fire and Rescue Plan for West Dunbartonshireidentified six areas for demand reduction and is subject to regular
monitoring and reporting through the Police & Fire and Rescue Committee. A summary of the priorities and current activity
is detailed below with further detail and analysis contained within this performance report.
About the statistics within this report 
The activity totals and other statistics quoted within this report are published in the interests of transparency and
openness. They are provisional in nature and subject to change as a result of ongoing quality assurance and review.
Because all statistics quoted are provisional there may be a difference in the period totals quoted in our reports after
local publication which result from revisions or additions to the data in our systems. The Scottish Government publishes
official statistics each year which allow for comparisons to be made over longer periods of time.
* Regarding3 Year Average and 5 Year Average percentages. These values indicate the percentage change
between the current 3 or 5 year average and the previous 3 or 5 year average. The value does not reflect the difference
between the current quarter against the 3 or 5 year average.
Activity levels have reducedby more than 5%
Activity levels have reduced by up to 5%
Activity levels have increased overall
3Page 29

Page 30

West Dunbartonshire Activity Summary
2019/20 2020/21 2021/22 2022/23 2023/24
91 122 156 138 105
61 62 87 74 68
171 158 216 176 137
323 342 459 388 310Total Incidents
All Special Services
All False Alarms
All Fires
0
100
200
300
400
500
2019/20 2020/21 2021/22 2022/23 2023/24
Total Incidents All Fires All Special Services All False Alarms
34%
19%
48%
34%
22%
44%
All Fires All Special Services All False Alarms
Incidents by Classification
Annual Average
5 Year Average
17.10%
16.45%
10.32%
9.35%
9.03%
8.71%
5.16%
2.90%
2.58%
2.58%
2.26%
2.26%
2.26%
1.61%
1.61%
False Alarm (UFAS)
False Alarm (Dwelling)
False Alarm (Good Intent)
Dwelling Fire
Outdoor Fire
Refuse Fire
Special Service - Effecting entry/exit
Vehicle Fire
Special Service - No action (not…
Special Service - Assist other…
Other Building Fire
Special Service - Lift Release
Special Service - Flooding
Other Primary Fire
Special Service - Animal assistance…
Top 15 Incident Types by % of Total Incidents
West Dunbartonshire OperationalTrends
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
105
fires
primary &
secondary
special
services
68
false
alarms
137
-22%
totalnumber of
incidents
310 -20%
-24%
fire & non-fire
casualties
7 -46%
economiccost of
ufasincidents
£104,410
Activityby Time of Day
-8%
(-33) (-6)
(-39)
(-78) (-6)
4Page 30

Page 31

12% 8% 1%
Year on
Year
3 Year
Average *
5 Year
Average *
Main Source of Ignition
Domestic Safety - Accidental Dwelling Fires
Detection Present
82.8% 70.8%
Detection Actuated
Calls Made via Linked Alarms
79.3%
19
7
2 1
Cooking
appliance
Electricity supply Other domestic
style appliance
Smoking Related
29
23
31
26
29
2019/20 2020/21 2021/22 2022/23 2023/24
65.5% 0.0%
48.3% 93.1%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage Only Nofire Damage
Alcohol/Drug Impairment
13.8%
Distraction
20.7%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
27.6%
Clydebank
Waterfront
27.6% 6.9%
Dumbarton
Kilpatrick Leven Lomond
10.3% 24.1% 3.4%
Clydebank
Central
PerformanceSummary
AccidentalDwelling Fires to Date
Main Source of Ignition
AccidentalDwelling Fires by Time of Day
Severity of AccidentalDwelling Fires
Human Factors
Automatic Detection & Actuation
AccidentalDwelling Fires Activity by Ward (% share)
(8) (8) (2)
(3) (7) (1)
(19) (0)
(14) (27)
(6) (4)
(24) (17)
(23)
5Page 31

Page 32

-50% -17% 13%
Year on
Year
3 Year
Average
5 Year
Average
Domestic Safety - Accidental Dwelling Fire Casualties
Breathing
difficulties (Other
than 'Overcome 100.0%
0.0%
0.0%
0.0%
0.0%
0 0 0
1
00 0 0 0 0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
100%
Female
0%
2 2 2 2
1
2019/20 2020/21 2021/22 2022/23 2023/24
Clydebank
Central
0.0%
Clydebank
Waterfront
0.0% 0.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 100.0% 0.0%
01 02 03
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
First Aidat Scene
Hospital -Serious Injuries
Hospital-Slight Injuries
Fatality
Performance Summary Fire Casualties by Time of Day
AccidentalDwelling Fire Casualties Year to Date
Nature of Injury
Extent of Harm
Age / Gender Profile
AccidentalDwelling Fire Casualties by Ward (% share)
(0) (0) (0)
(0) (1) (0)
(1) (0)
(0) (0)
S   6Page 32

Page 33

-44% -19% 11%
5 Year
Average
Year on
Year
3 Year
Average
Unintentional Injury or Harm
Head injury
Bruising
Cuts/Lacerat
ions
Collapse
Other
20.0%
20.0%
20.0%
20.0%
20.0%
0.0%
1
0 0 0
11 1
0
1
0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
40%
Female
60%
Clydebank
Central
Clydebank
Waterfront
20.0% 20.0%
Dumbarton
Kilpatrick Leven Lomond
40.0% 0.0% 0.0%
20.0%
Road Traffic Collision Water Rescue
Assisting Other Agencies
20.0% 0.0%
80.0%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
First Aid at Scene
Hospital -Serious Injuries
Hospital -Slight Injuries
0.0%
40.0% 20.0%
Fatality
40.0%
15
11 11
9
5
2019/20 2020/21 2021/22 2022/23 2023/24
PerformanceSummary
Non-Fire Casualties Year to Date
Non-Fire Casualties by Time of Day
Nature of Injury
Extent of Harm
Non-FireEmergency Activity
Age / Gender Profile
Non-FireCasualties by Ward (% share)
(1) (1) (1)
(2) (0) (0)
()(1)
(2) (1)
(0) (2)
(4)
7Page 33

Page 34

-40% -11% 16%
Year on
Year
3 Year
Average
5 Year
Average
Deliberate Fire Setting
Clydebank
Central
Clydebank
Waterfront
23.2% 16.1%
Dumbarton
Kilpatrick Leven Lomond
5.4% 21.4% 14.3%
19.6%
48
87
111
94
56
2019/20 2020/21 2021/22 2022/23 2023/24
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
0.0%
20.8%
17.2%
17.1%
14.9%
16.1%
0.0%
79.2%
82.8%
82.9%
85.1%
83.9%
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
Primary Secondary
0
1
3
5
Other Buildings
Dwellings
Vehicles
Other Primary
22
25
Refuse
Other Secondary
323 342
459
388
310
38 72 92 80 47
0
200
400
600
0
200
400
600
2019/20 2020/21 2021/22 2022/23 2023/24
All Incidents Deliberate Secondary Fires
PerformanceSummary
Deliberate Fires Year to Date
Deliberate Fires by Time of Day
Deliberate Fires by Classification
Primary Fire Ratio by Activity Type
Secondary Fire Ratio by Activity Type
Deliberate Fires Compared to OperationalActivity
Deliberate Fires by Ward (% share)
(11) (13) (9)
(3) (12) (8)
8Page 34

Page 35

17% 11% 28%
Year on
Year
3 Year
Average
5 Year
Average
Non Domestic Fire Safety
7
5
7
6
7
2019/20 2020/21 2021/22 2022/23 2023/24
Clydebank
Central
Clydebank
Waterfront
14.3% 0.0%
Dumbarton
Kilpatrick Leven Lomond
14.3% 14.3% 28.6%
28.6%
86%
14% 0%
Accidental Deliberate Not Known
57.1% 28.6%
42.9% 71.4%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage No FireDamage
2
1
1
1
1
1
Other Residential,
Hotel/motel
Other Residential, Sheltered
Housing - not self contained
Retail, Shopping Centre
Public admin, security and
safety, Police station
Food and Drink, Takeaway,
fast food
Hospitals and medical care,
Other (including surgery)
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00Performance Summary
Non-Domestic Fires Year to Date
Non-Domestic Fires by Time of Day
Non-Domestic Fires by Nature of Origin
Non-Domestic Fires by Ward (% share)
Severity of Non-DomesticFires
Non-Domestic Fires by Premises Type
(2) (1) (0)
(1) (1) (2)
(4) (2)
(3) (5)
9Page 35

Page 36

-48% -9% 12%
5 Year
Average
Year on
Year
3 Year
Average
Unwanted Fire Alarm Signals
111
82
144
101
53
2019/20 2020/21 2021/22 2022/23 2023/24
Clydebank Clydebank
Waterfront
30.2% 9.4%
Dumbarton
Kilpatrick Leven Lomond
5.7% 11.3% 22.6%
20.8%
18
8
7
5
3
Residential Home,
Nursing/Care
Hospitals and medical care,
Hospital
Residential Home, Children's
Other Residential, Hotel/motel
Other Residential, Sheltered
Housing - not self contained
17%
UFAS Percentage Against all Incidents
UFAS Percentage Against all False Alarms
39%
Human Influence and Alarm Activations
28.3%
0.0
1.0
2.0
Mon Tue Wed Thu Fri Sat Sun
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
Performance Summary
Unwanted Fire Alarm Signals Year to Date
Unwanted Fire AlarmSignals by Ward (% share)
Unwanted Fire Alarm Signalsby Time of Day
Unwanted Fire Alarm Signals- Top 5 Premises
Unwanted Fire Alarm Signals Activity Ratios
Average UnwantedFire Alarm Signals per Day
(119)
(15)
(11) (16) (5)
(3) (6) (12)
(119)
10Page 36

Page 37

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Housing and Employability
Committee: Housing and Communities Committee 22 November 2023
Subject: Housing and Employability Delivery Plan 2023/24 mid–year Progress
1 Purpose
1.1 This report sets out the mid -year progress of the Housing and Employability
Delivery Plan 2023/24.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 The Housing and Employability Delivery Plan 2023/24 was presented to
Housing and Communities Committee on 3 May 2023 with a commitment to
report mid-year and year-end progress in November 2023 February and May
2024 respectively.
4 Main Issues
4.1 The Delivery Plan for 2023/24 was supported by an action plan of activities to
be delivered over the year. At this mid-year point, four of the 42 actions have
been completed, 38 are progressing as planned and are anticipated to be
completed by 31 March 2024.  Appendix 1 details the progress on delivery of
this action plan.
4.3 Also included in the plan are 31 performance indicators which measure
progress across key areas and link to the Strategic Plan 2017-2022.  25 of the
performance indicators are monitored on a quarterly basis. Performance is
summarised below, based on all data available at this time. Of the PIs that
missed target in the second quarter five of these have shown improvement
over the previous quarter, suggesting improvements are being made in year. 
Appendix 1 details the progress at this mid-year point.
ITEM 8
Page 37

Page 38

PI Status Q1 Q2 
Target met or exceeded 15 14 
Target significantly missed 4 3 
Target narrowly missed 6 8 
Total No. of available PIs  25 25 
5 People Implications 
5.1 There are no direct people implications arising from this report. 
6 Financial & Procurement Implications 
6.1  There are no direct financial or procurement implications arising from this
report. 
7 Risk Analysis 
7.1  Failure to deliver on the actions assigned to Housing and Employability may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved. 
8 Equalities Impact Assessment 
8.1  Screening and impact assessments will be carried out on specific activities as
required. 
9 Consultation 
9.1  The delivery plans were developed through consultation with officers from the
strategic service areas. 
10 Strategic Assessment 
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council. 
Chief Officer: Peter Barry
Service Area:  Housing and Employability  
Date: 30th October 2023 
_____________________________________________________________ 
Person to Contact:  Nicola Docherty    
nicola.docherty@west-dunbarton.gov.uk 
Page 38

Page 39

Appendices:  Appendix 1: Housing and Employability Delivery Plan
2023/24 – mid-year progress of Actions & PIs 
Background Papers: Housing and Employability Delivery Plan 2023/24 –
Housing and Communities Committee, 3 May 2023  
Strategic Planning & Performance Framework 2022/27   
Wards Affected: All
Page 39

Page 40

H&E  Delivery Plan Mid-year Progress 2023/24
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Performance
Indicator
Q1 2023/24 Q2 2023/24
Notes & History Latest Note Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Number of
incidents directed
to Police by
Public Space
CCTV team
398 100 362 100 Performance remains strong with target
exceeded in both quarters.
Nicola
Pettigrew
% of anti-social
behaviour cases
resolved
86% 85% 98.2% 97% Performance remains strong with target
exceeded in both quarters.
Scott
McLelland
% of Public
Space CCTV
cameras that are
operational 81% 90% 71.53
% 90%
Overall at mid-year point the target has
been missed. Performance in the 2nd
quarter is directly as a result of a major
network issue which took VWS time to
identify and source parts. Pending
survey of all CCTV to be commenced
which will look to assess and identify
improvements required to existing
Nicola
Pettigrew
ITEM 8 - APPENDIX 1
Page 40

Page 41

Performance
Indicator
Q1 2023/24 Q2 2023/24
Notes & History Latest Note Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
system which will help improve overall
operational capacity 
Action Status Progress Due Date Note Owner
Develop and implement the
revised Antisocial Behaviour
Strategy  
31-Mar-
2024
This action is progressing as planned. Work has begun on the
development of the ASB strategy. We have agreed to advance
the strategy with partners from the CPP Safe Dig. We have
started work on the Equality Impact Assessment and the ASB
community engagement survey is now live. The feedback from
both the surveys as well as the EIA will help to identify the key
priorities for the ASB strategy.
Nicola
Pettigrew
Develop CCTV transmission
strategy  
31-Mar-
2024
This action is progressing as planned. This project now reports
to the Community Empowerment Project Board. CCTV Delivery
Group meetings are on-going and include engagement with
colleagues in Procurement to ensure the appropriate methods of
securing the full survey. Further details on this process should
be available by the end of August. 
Nicola
Pettigrew
Upgrade CCTV infrastructure   31-Mar-
2024
This action is progressing as planned. This project now reports
to the Community Empowerment Project Board and Project
Team meetings. Work is currently focussed on securing the
survey work with a meeting on 16.08.23 with a potential
supplier. The scope of the project now includes Housing
cameras through discussion with the TRA and Housing
colleagues. 
Nicola
Pettigrew 
Page 41

Page 42

Objective 2. Our residents health and wellbeing remains a priority 
Performance
Indicator
Q1 2023/24 Q2 2023/24 Notes & History Latest Note
Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend 
% of Youth
Homelessness
levels in West
Dunbartonshire 
24.6% 25%    28.5% 25%  
Overall performance for the mid-year
position has narrowly missed target.
Youth homelessness remains a concern
in West Dunbartonshire, a refreshed
approach will be introduced in early 2024
which will see the development of an
assertive outreach and prevention
approach to combat youth homelessness
and ensuring successful independent
living.
John Kerr 
Action Status Progress Due Date Note Owner
Respond to the findings of the
Homelessness Prevention and
Temporary Accommodation
Task and finish Group
recommendations  
31-Mar-
2024
This action is progressing as planned.  We have developed a
local response to each of the 15 recommendations within the
Task and Finish group report and an action log
developed.  These actions will be delivered within short and
medium timescales and will be reported in regular intervals to
the Housing and Communities Committee as part of the RRTP
reporting.
John Kerr
Carry out a review of the
Council’s approach to
Homelessness prevention  
31-Mar-
2024
This action is progressing as planned. We are preparing the
service through some transformational change that will ensure
we meet the significant requirements of the Homelessness
Prevention duties, these will be reported to the Housing and
John Kerr
Page 42

Page 43

Action Status Progress Due Date Note Owner
Communities Committee in early 2024 once the new Housing
Bill is published.
Implement Year 5 of the Home
at the Heart – Rapid
Rehousing Transition Plan  
31-Mar-
2024
This action is progressing as planned, Good governance
arrangements in place. John Kerr
Review and provide greater
integration within Housing
Support  
31-Mar-
2024
This action is progressing as planned. A new redesigned
housing support service which will put people at the heart of its
activities will launch in early 2024.  This will allow a more
targeted approach to support households in temporary
accommodation and to settle into mainstream council tenancies.
John Kerr 
Objective 3. Our residents are supported to increase life and learning skills 
Action Status Progress Due Date Note Owner
Ensure no one left behind by
supporting skills and learning
for work, life and learning  
31-Mar-
2024
This action is progressing as planned. We have secured funds
for No One Left Behind, Parental Employability Support and UK
Shared prosperity. We have identified activity to develop skills
among people targeted for the use of these funds and
established a set of SMART targets. We have undertaken grant
distribution and engaged specialist employability support
providers to support our aims. We anticipate that this will begin
to show progress towards our targets in the latter part of the
year.
Stephen
Brooks
Review and implement revised
service provision for W4U and
Communities – youth learning  
31-Mar-
2024
This action is progressing as planned. We have identified
service priorities for the remaining members of staff and a plan
for the Youth Learning Team will emerge as a result of the
consultation for the restructure of the Communities Team.
Stephen
Brooks
Page 43

Page 44

2. Our Environment 
Objective 5. Our resources are used in an environmentally sustainable way 
Action Status Progress Due Date Note Owner
Deliver a Greener, Fairer
Housing Asset Management
Strategy and Investment Plan  
31-Mar-
2024
This action is progressing as planned. A new Housing Asset
Management Strategy is targeted to be delivered for approval in
2024.  Timelines have been amended as we await the
publication of the EESSH2 standard.
John Kerr
Develop new Housing Design
Standard incorporating
proposed changes to
specifications for new social
housing  
31-Mar-
2024
This action is progressing as planned. New refreshed Design
Standard to be presented to the Housing and Communities
Committee in November 2023
John Kerr
Deliver an approach to meet
Energy Efficiency Standard for
Social Housing (EESSH 2)  
31-Mar-
2024
This action is progressing as planned. We await the publication
of the new EESSH standard which has been delayed by the
Scottish Government but is now expected in late 2023.
John Kerr
Deliver a Greener, Fairer
revised HRA Capital Investment
Plan  
31-Mar-
2024
This action is progressing as planned. A new Housing Asset
Management Strategy is targeted to be delivered for approval in
2024.  Timelines have been amended as we await the
publication of the EESSH2 standard.
John Kerr 
Objective 6. Our neighbourhoods are sustainable and attractive 
Page 44

Page 45

Performance
Indicator
Q1 2023/24 Q2 2023/24 Notes & History Latest Note
Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend 
% of properties
returned from
repairs within
target 
21.3% 80%    38.7% 80%  
Target not met, however performance
has improved in the second quarter. This
is reflective of dealing with long term
voids which are now reducing
significantly, we anticipate improvement
over the remaining year.
Martin
Feeney
Average time
taken (in days)
to complete
medical
adaptations 
47 79    32 79   Target exceeded. Alan
Young
Tenancy
Sustainment
Levels within
Housing First 
100% 90%    100% 90%   Target exceeded. John Kerr
% of all
homeless cases
re-assessed
within 12
months (repeat
homelessness) 
5.6% 5%    4.8% 5%  
Target met in Q2 and narrowly missed in
Q1. Overall mid-year position is on track
to achieve year- end target. Analysis of all
repeat cases of homelessness is carried
out on an ongoing basis and key drivers
continue to be when an applicant has lost
contact with the service and then
represents or when there has been a
relationship breakdown and further
assistance is required.
John Kerr
Average time (in
days) to inspect  51.8 12    25 12   Target missed. Significant progress has
been made in the second quarter.  We
Martin
Feeney
Page 45

Page 46

Performance
Indicator
Q1 2023/24 Q2 2023/24 Notes & History Latest Note
Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend 
and repair
empty homes
expect improvements in the next few
months as teams focused on returning
older voids which required extensive work
which had not been identified as a priority
Percentage of
repairs
appointments
kept 
93.9% 91.5%    91.6% 91.5%   Target met.  Suzanne
Bannister
% of properties
that require a
gas safety
record which
had a gas check
and record
completed by
the anniversary
date 
100% 100%    100% 100%   Target met.  Martin
Feeney
Percentage of
reactive repairs
carried out
completed right
first time 
86.3% 90%    85% 90%  
Target narrowly missed. 6,618 non-
emergency repairs carried out in 2nd
quarter with 5,623 of those right first time,
target not achieved due to the completion
of a number of out of target repairs. As
per the Regulator definition a repair which
has not met the target cannot be included
as being right first time.  We expect to
see an improvement over the next few
Martin
Feeney
Page 46

Page 47

Performance
Indicator
Q1 2023/24 Q2 2023/24 Notes & History Latest Note
Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend 
months due to the reduced numbers of
out of target repairs.
% of tenants
satisfied with
the repairs and
maintenance
service 
99.75
% 86%    99.6% 86%  
Target exceeded. Satisfaction surveys
based on face to face interviews. 
Martin
Feeney
Average length
of time (in
hours) taken to
complete
emergency
repairs 
5.15 6    5.43 6  
Target exceeded.  Martin
Feeney
The number of
incidences of
youth
homelessness
in West
Dunbartonshire
is reduced 
79 70    92 70  
Target not met in both quarters. Youth
homelessness remains a concern in West
Dunbartonshire, a refreshed approach
will be introduced in early 2024 which will
see the development of an assertive
outreach and prevention approach to
combat youth homelessness and
ensuring successful independent living.
John Kerr
% of council
dwellings that
meet the
Scottish
Housing Quality
Standard 
40% 69%    42.5% 69%  
Target missed. Despite target not being
met, significant incremental progress has
been made over the last year to meet
target.
Alan
Young
Page 47

Page 48

Performance
Indicator
Q1 2023/24 Q2 2023/24 Notes & History Latest Note
Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend 
Average time
taken (in days)
to complete
non-emergency
repairs 
11.17 8.4    12.5 8.4  
Target missed. 6618 re-active repairs
complete in the second quarter with the
average number of days increased, this is
due to teams focusing on reducing the
number of complex out of target repairs,
we expect to see an improvement in the
next quarter.
Martin
Feeney 
Action Status Progress Due Date Note Owner
Deliver the HRA Capital
Improvement programme for
2023/24  
31-Mar-
2024
This action is progressing as planned. Core projects are
progressing with most on track or exceeding cumulative targets at
time of reporting including EWI, heating, environmental (paths),
showers / bathrooms / kitchens, uPVC window and door
installations. The service has an action plan in place to recover as
much as possible a number at risk programmes including EICRs.
Overall good progress is reported on HRA capital funded
improvement programmes managed and delivered by building
services.     
Martin
Feeney
Improve customer
satisfaction with Building
Services  
31-Mar-
2024
This action is progressing as planned. To date we developed and
conducted the 2023/24 customer satisfaction improvement plan.
Over the remaining year we will use customer feedback to identify
key areas for improvement.
Martin
Feeney
Improve maintenance &
repairs performance  
31-Mar-
2024
This action is progressing as planned. Good progress is being
made in the delivery of reactive repair performance. The service
has focused on clearing out of target repairs whilst servicing the
continuing repairs raised. The percentage of out of target repairs of
Martin
Feeney
Page 48

Page 49

Action Status Progress Due Date Note Owner
all active repairs remains higher than target, but the number of
repairs that are 6 months or older has been significantly reduced in
the first 6 months of 2023/2024.  Training has been delivered to
key staff and further training needs will be considered throughout
the remaining year.
Reduce the number of empty
properties under repair  
31-Mar-
2024
This action is progressing as planned. Very good progress is being
made with the number of void properties under repair reducing
month on month year to date. The service has significantly reduce
the number of void properties sub contracted with most now
completed by in-house teams. As the number of void properties
under repair reduces and older properties are returned ready for
the let; the average days to inspect and repair void properties is
also reducing and action is on track to be achieved by target date. 
Martin
Feeney
Improve progress on Electric
Installation Condition Reports  
31-Mar-
2024
This action is progressing as planned. To date we have carried out
a review of notification and appointment letters to ensure they are
clear and concise and relay the importance of EICRs. Over the
remaining year we aim to review the administration process for the
EICR and apply appropriate improvements to improve access
rates. 
Martin
Feeney
Implement revised process
and monitor performance to
address dampness and
mould in Tenant Homes  
31-Mar-
2024
This action is progressing as planned. To date we have developed
a monthly process for capturing, monitoring and reporting on damp
and mould reports. Over the remaining year we will agree an
installation programme of environmental sensors with Council
housing stock and monitor effectiveness of improvement.
Martin
Feeney
Ensure the Council’s Housing
stock maintains compliance
with the Scottish Housing
Quality Standard and reduce  
31-Mar-
2024
This action is progressing as planned. Monitoring on contributing
work streams show good progress in excess of targets on energy
efficiency projects, however progress in EICR is much less than
planned. Building Services are taking actions to change delivery
contractor in efforts to improve completions of EICR's it is
Alan
Young
Page 49

Page 50

Action Status Progress Due Date Note Owner
the number of properties held
in abeyance.
anticipated that the additional delivery contractor will be approved
by end of October.
Ensure the Council’s Housing
stock progresses towards the
achievement of the energy
efficiency standard for social
housing.  
31-Mar-
2024
This action is progressing as planned. Monitoring on contributing
work streams show progress in excess of targets on the majority
and going very well at this stage. Some other work streams are
under target and officers are working to improve this position.
Alan
Young
Develop Housing Capital
Investment Plan for 2023/28.  
31-Mar-
2024
This action has been successfully completed. A consultation was
undertaken with tenant groups and areas for additional capital
investment have been developed and agreed. A full report was
presented and approved at August HAC committee.  Additional
budget incorporated into main programme and additional target
numbers have been added to progress monitoring. 
Alan
Young
Deliver Year 2 local Housing
Strategy Objectives  
31-Mar-
2024
This action is progressing as planned. Progress will be reported to
the Housing and Communities Committee in November 2023 and
the action plan remains to be delivered in line with the agreed
targets.
John Kerr
Deliver the Council’s
Affordable Housing Supply
Programme  
31-Mar-
2024
This action is progressing as planned.  While a number of external
and internal factors have delayed the programme resulting in an
element of profiling we are onsite at Clydebank East and will
shortly have a site start at the Pappert development.
John Kerr
Review Council buyback
policy  
31-Mar-
2024
This action is progressing as planned. New buyback policy and
framework will be presented to the first Housing and Communities
Committee in 2024
John Kerr
Develop an approach to
delivering alternative housing
tenures  
31-Mar-
2024
This action is progressing as planned.  Good progress has been
made and we are in discussions with Scottish Futures Trust in
terms of developing a suitable delivery model in West
Dunbartonshire that will provide additional housing tenures. This
John Kerr
Page 50

Page 51

Action Status Progress Due Date Note Owner
will be reported to a future Housing and Communities Committee
meeting.
Increase tenant participation
in relations to housing ops
(response rates)  
31-Mar-
2024
This action is progressing as planned. We are exploring
opportunities to engage with key groups this includes working with
Tenant Participation Team/WDTRO to understand existing
methods and opportunities.   IHMS issue resolved for surveys and
will now be backdated to be sent from April.  Agreed that incentives
will be offered to encourage increased uptake of returns.
Nicola
Pettigrew
Implement digital
improvement for housing
operations ( mobile app)  
31-Mar-
2024
This action is progressing as planned. New tenant visit (NTV) pilot
working well, now being extended to further 10 Housing Officers. 
PTV next stage being developed.
Nicola
Pettigrew
Implement digital
improvement for housing
operations (self-serve portal)  
31-Mar-
2024
This action is progressing as planned. We are working SB with the
IHMS team and have identified key areas such as housing
application form, medical and termination and succession and
mutual exchange. We are also working with IHMS team to
complete mapping processes to help support further development
of self-portal.  
Nicola
Pettigrew 
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to meet
citizen
expectation and
service
standards
Risk of citizen
dissatisfaction due to us
not doing what we say
we will when we say we
will or not completing
required works first time.    
25-Oct-
2023
Mid-year figures show satisfaction performance
on target and improved from previous year.
Satisfaction is based on face to face interviews
and may present a bias. Work is ongoing with
IHMS to include automated satisfaction surveys
to reduce any potential bias.
Martin
Feeney
Page 51

Page 52

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to
secure funding
to invest in
WDC’s CCTV
infrastructure.
The public space CCTV
infrastructure covers the
three main townships of
Alexandria, Dumbarton
and Clydebank with a mix
of fixed space and
redeployable cameras.
Until resources can be
secured and
improvements made the
Council does remain at
risk from reputational
damage, should the
system fail.    
27-Sep-
2023
This project has secured UK Shared Prosperity
funding and a full survey of the CCTV
infrastructure is being procured to support the
project development. Project responsibility is
transferring to Housing Operation from the
Communities Team. The hand-over period will
ensure the project stays on-track and the
funding is appropriately invested. This risk
remains unchanged. 
Nicola
Pettigrew 
Failure to
deliver medical
adaptations in
agreed target
timescales
This is monitored to
ensure target timescale
of 79 days average for
housing medical
adaptations is adhered to
ensure satisfaction with
the service and support
those in need of this
service.    
02-Oct-
2023
Good overall progress in-year so far and
continuing to clear legacy jobs helping to
improve the overall position. Average days
performance continues to improve and in target
for Q1 (46days) & Q2 (32days) On track overall
for improvement and reducing risk.
Alan
Young
Failure to
achieve the
outcomes of the
Scottish Social
Housing Charter
The Scottish Social
Housing Charter sets out
the standards and
outcomes that tenants
and customers should
expect from social  
29-Oct-
2023
Assessment remains as previous, however
increased risk concerns have been identified
and included within the Councils Annual
Assurance Statement which was submitted to
the Housing Regulator in October
John Kerr
Page 52

Page 53

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
landlords, in terms of the
quality and value for
money of the services
they receive. Failure to
continue to meet these
could place the Council
at risk of the intervention
powers of the Scottish
Housing Regulator 
Failure to
maintain
Housing Stock
The risk that Council’s
Housing Stock are not
fully fit for purpose with
consequent adverse
impact on our ability to
deliver efficient and
effective housing for
Council tenants.  
23-Oct-
2023
No change to risk score, programme for
investment and upgrades to council housing
continues into 23-24 and a further five year
programme to 27-28. 
Alan
Young 
3. Our Economy 
Objective 7. Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish 
Page 53

Page 54

Action Status Progress Due
Date Note Owner
Engage with W4 business to
explore the potential for
access to green jobs for local
residents  
31-
Mar-
2024
This action is progressing as planned. To date we have established
a steering group for the management of the delivery of UKSPF
priorities and the development of a monitoring framework. We will
use this group to explore the potential for improving access to green
jobs.
Stephen
Brooks 
Objective 8. We will support our residents to access employment and training opportunities 
Performance
Indicator
Q1 2023/24 Q2 2023/24
Notes & History Latest Note Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Value (£) of
debt managed 
£323,
726
£320,
000   
£303,
455
£375,
000  
Overall at mid-year the target has been
missed. Performance in quarter 2 has
shown a significant decline. 
Stephen
Brooks
Number of local
people entering
employment
through
Working 4U 
134 134    64 64  
Target met. Employability Teams have
had high volumes of registrations for
support in Q2 - the focus in quarter 3
and 4 of this year will be on achieving
outcomes including employment. We
anticipate that we will support 407
people into work through the various
activities we are delivering. This
includes activities consistent with No
One Left Behind and Parental
employability support (families affected
by child poverty); and UK Shared
Prosperity (economically inactive and
Stephen
Brooks
Page 54

Page 55

Performance
Indicator
Q1 2023/24 Q2 2023/24
Notes & History Latest Note Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
vulnerable young people). These are
particularly difficult groups to engage
and help. Nevertheless we anticipate
that we will continue to achieve
outcomes that are consistent with
previous years.
Number of local
people entering
education or
training 
183 172    382 179   Target exceeded.  Stephen
Brooks
Number of local
people gaining
a full
qualification 
243 139    122 106   Target exceeded. Stephen
Brooks 
Action Status Progress Due
Date Note Owner
Support and implement CLD,
Employability and Welfare
benefit three year plans to
promote quality frameworks and
partnership working to enhance
work, learn, money service
provision  
31-Mar-
2024
This action has been successfully completed. We have reviewed
the Employability strategic partnership, established the food
insecurity partnership and the Adult learning partnership group
has met to discuss priorities in the light of changes at Working4U.
The youth alliance will be reviewed as part of the re-structure of
the Communities Team.
The main element of this activity has been achieved, but this will
be ongoing throughout the planning periods.
Stephen
Brooks
Page 55

Page 56

Action Status Progress Due
Date Note Owner
Maximise income from
employment – supporting
residents into employability  
31-Mar-
2024
This action is progressing as planned. The local child poverty plan
is based on addressing the drivers of poverty. These include
supporting people to maximise income from employment. We
have established our employability plan and will deliver activities
through the use of UK Shared Prosperity Funding and No One
Left Behind Funding. To date we have supported almost 200
people into employment during this financial year
Stephen
Brooks
Promote inclusive growth
through access to training and
apprenticeship opportunities  
31-Mar-
2024
This action is progressing as planned. We have established our
annual Modern Apprenticeship and Foundation Apprenticeship
courses and we have developed out learning centre accredited
courses to ensure that we have the capacity to deliver appropriate
training that will meet the demands of employers in the local
labour market. 
Our Modern Apprenticeship provides access to opportunities in
social care and childcare, business admin and construction and
we are currently supporting more than 120 Modern and
Foundation apprentices. This is complemented with support for
those who wish to progress in the labour market through training
and development. To do this we are working with social service
teams to support their workforce development requirements.
Stephen
Brooks
Page 56

Page 57

Action Status Progress Due
Date Note Owner
Review and implement revised
service provision  W4U – adult
learning  
31-Mar-
2024
This action is progressing as planned. We have reviewed service
provision and have a plan in place to deliver adult learning
services throughout West Dunbartonshire. Our focus will be
placed on  the delivery of:
• Adult Literacies: Rolling programmes of support based on
individual needs as well as an Additional Learning Support
Needs (ALSN) group run in partnership with Unity Empower.
• Community based Vocational Courses: SQA accredited
units, SCQF levels 4 - 6 in a range of subject areas including
Humanities, Childcare, IT, Practical skills such as Fashion and
Textiles, Horticulture and Cookery as well as British Sign
Language.
• Digital Learning: Rolling programmes of Digital Friends
which offers complete beginners one-to-one support.
• ESOL: Rolling programme of community classes.
• Family Learning: Rolling programme of short Family
Learning activities, for the most part in partnership with
Primary schools.
Stephen
Brooks   
Objective 9. We will work with partners to support economic development to deliver increased prosperity for our area 
Page 57

Page 58

Performance
Indicator
Q1 2023/24 Q2 2023/24
Notes & History Latest Note Owner Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Total Value (£) of
Income
Generated 
£2,27
3,671
£2,02
7,674   
£1,91
6,069
£1,05
7,442   Target exceeded.  Stephen
Brooks
Number of local
people receiving
support through
Working 4U 
2,258 1,694    2,280 1,351   Target exceeded. Stephen
Brooks 
Action Status Progress Due
Date Note Owner
Establish the monitoring and
reporting framework for UK
Shared prosperity.  
31-Mar-
2024
This action has been successfully completed. We have completed
the required documentation to draw down the first year of UK
Shared Prosperity Funding. This includes a clear description of the
activities with associated outputs and outcomes for all the activity.
We have established methods for gathering that information and this
will be used to inform future claims and reporting. 
The outcomes centre on the UKSPF priorities: 'community and
place'; 'business development'; 'people and skills' and 'Multiply'. The
Communities Team will take forward actions within 'communities
and place' priority. Along with addressing perceptions of community
safety, the Communities Team will be develop activity around
participatory budgeting, empowerment and representation. The
Youth Learning Team, that’s transferred to Communities will focus
on encouraging young people to participate in the processes and
activity. Working4U will take forward the 'People and Skills' priority
Stephen
Brooks
Page 58

Page 59

Action Status Progress Due
Date Note Owner
and 'Multiply'. This is a significant funding investment and will
require input from the employability teams (youth and adult), welfare
rights (addressing barriers that prevent people from considering
work as an option)  and the adult learning teams (providing access
to community-based learning to assist their pathway to work.
Produce Local Child Poverty
annual report  
31-Mar-
2024
This action has been successfully completed. The child poverty
repot was reviewed and approved at the meeting of the Population
Wellbeing Committee on the 17th October; the final draft is now
published on West Dunbartonshire Council's website. The report
highlights our approach to addressing the drivers of poverty:
maximising income from work; maximising income from benefits;
reducing costs and supporting families through trigger events that
could undermine their well-being. There are key roles in this for the
welfare/benefits advice team (maximising benefit); the employability
teams (youth and adult) (maximising employment opportunities) and
the community learning teams (supporting families to become more
resilient). 
Meanwhile, we have compiled applications for Scottish Government
funding for ‘cash first’ approaches, if successful will provide
additional resources to address food insecurity. We have also
submitted a proposal for child poverty accelerator funding. Through
this we will establish a Family Prosperity Group. This will consist of
key partners seeking ways to stimulate joint initiatives that will
address child poverty. Key partners will be those delivering frontline
services such as: employability, benefits, community learning and
development, education, criminal justice and health and social care.
Stephen
Brooks
Page 59

Page 60

Action Status Progress Due
Date Note Owner
Review and implement
revised service provision 
W4U – Welfare support  
31-Mar-
2024
This action is progressing as planned. To date the consultation has
been conducted and concluded. As a result of the consultation
Working4U staff complement has been reduced by 20 full-time
equivalents. This does not include the staff being transferred to the
Communities Team. We have established a plan based on the
service priorities emerging from reduced staffing in the Adult
Learning Team.
Stephen
Brooks 
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to
respond to child
poverty
legislation 
The Local Child
Poverty Plan sets out
what we will do to
respond to child
poverty, failure to
respond will have a
significant impact on
the Council’s
reputation, more
importantly an
opportunity to raise
issues and respond
more effectively to
child poverty issues
will be lost  
02-Oct-2023
The Local Child Poverty Annual report was
written and published in October 2022. Work is
progressing on the 22/23 annual report. 
Stephen
Brooks
Page 60

Page 61

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
The cost of
living crisis will
lead to a
substantial
demand for
access to
welfare/debt
support
services.
We will monitor the
changing levels of
demand and target our
resources to
individuals and areas
that are most in need.
We will seek to work
with partners to ensure
we receive appropriate
referrals who can
benefit from our
support. 
02-Oct-2023
We are working to ensure we focus our efforts on
those most affected by the cost of living crisis.
This includes managing food insecurity and fuel
debt funds
Stephen
Brooks 
4. Our Council 
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents 
Action Status Progress Due
Date Note Owner
Develop and implement
wellbeing, employee
engagement, equality and
learning and development
plans to enable capabilities,
improve resilience and
promotion of a diverse
workforce  
31-Mar-
2024
This action is progressing as planned. All services are ensuring Be
the Best conversations take place with staff on a regular basis. We
use this as an opportunity to review training and development
requirements and general well-being. We also use these meetings
to reinforce awareness of the well-being resources that are
available to staff. 
Peter
Barry
Page 61

Page 62

Action Status Progress Due
Date Note Owner
A working group, headed by Working4U, was established to review
the potential for securing accreditation for the Equally Safe at
Work. This is an employer accreditation programme that supports
gender equality in the workplace. We received notification of
success and will receive the award documentation in October. An
ilearn module about equally safe in the workplace has been
created: 'Together for Gender Equality' and all staff will be
encouraged to complete the module.
Develop and implement
employee life cycle plans in
line with the People First
Strategy to attract and retain
the workforce  
31-Mar-
2024
This action is progressing as planned.  This year we have identified
the need for SQA accredited training staff and, as a result, we have
embarked on a programme of training to support staff development
in this area. 
Eight members of staff have started their studies and have almost
completed their respective qualifications. This improves our
capability to undertake assessor and verification in the childcare,
business admin and construction sectors.  In building services we
continue to recruit apprentices which contributes towards our
succession planning. 
Peter
Barry
Implement service review
process including role design,
use of new technology and
new ways of working  to add
resilience, address gaps, and
establish opportunities for
efficiencies  
31-Mar-
2024
This action is progressing as planned. Work is ongoing with ICT
and the automation team to explore efficiencies in invoicing for
building services and to ensure that W4U frontline employees have
the appropriate tools in a arrange of community settings 
Our employees working in outreach settings are required to scan
and securely file and send sensitive personal information. In
addition, they communicate from outreach on Teams through
mobile devices. We have reviewed all staff use of mobiles to
ensure this remains effective and efficient.
Peter
Barry
Page 62

Page 63

Action Status Progress Due
Date Note Owner
Develop and implement
learning and development
plans and development
opportunities to improve
capabilities and resilience
within the workforce  
31-Mar-
2024
This action is progressing as planned. Services are ensuring that
employees and completing all WDC statutory learning and training
courses. In addition to this employees are supported and
encouraged to ensure they are aware and update of changes in
legislation that impacts their role and the service they provide. 
Peter
Barry 
Objective 11. Our Council is adaptable and focused on delivering best value for our residents 
Performance
Indicator Q1 2023/24 Q2 2023/24 Notes & History Latest Note
Owner 
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend 
Average length
of time to re-let
properties 
53.6 30    36.9 30   Target not met, however showing
improvement in the short and long term
trend with significant improvement made
in the second quarter. Performance was
impacted due to targeting longer term
voids, continued improvements showing
in monthly trend which is reflective of Q2
position
Nicola
Pettigrew
% of council
rent that was
lost due to
houses
remaining
empty 
1.33% 1%    1.08% 1%   Target narrowly missed at 1.08%,
however showing improvement in the
short and long terms trend with significant
improvement made in the second quarter.
Nicola
Pettigrew
Page 63

Page 64

Action Status Progress Due
Date Note Owner
Implement improvement plan
for Building services – year 3  
31-Mar-
2024
This action is progressing as planned. To date the SRRG approved
the implementation of phase 2 of the review of Building Services on
26/07/2023 subject to this being checked and compliant with SOM. 
Martin
Feeney 
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to
implement
IHMS system
across building
services
The effective
implementation of
the IHMS system
will delivery
efficiency, improve
case tracking,
capture customer
satisfaction and
improve service
delivery.  
25-Oct-
2023
Good progress has continued to be made in
2022/2023 on Building Services IHMS
improvement action plan. Work and development
will continue in 2023/2024.    Martin
Feeney 
Action Status 
Cancelled 
Overdue 
Not on track 
In Progress and on track
Page 64

Page 65

PI Status 
Target significantly missed 
Target narrowly missed 
Target met or exceeded 
Long Term Trends 
Improving 
No change 
Declining 
Short Term Trends 
Improving 
No change 
Declining 
Completed Risk Status 
Alert 
High risk 
Warning 
OK 
Unknown
Page 65

Page 66

Page 66

Page 67

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 22 November 2023
__________________________________________________________________
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme 
1. Purpose
1.1 This purpose of this report is to provide the Housing and Communities
Committee an update on progress with West Dunbartonshire’s More Homes
Programme which oversees the delivery of the Council’s new home building
programme.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach;
and
3. Background
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which has successfully delivered over 1000 new affordable homes in West
Dunbartonshire to date and includes the Council’s own ambitious New House
Building Programme.
3.2 The Council’s last practical completion took place at the Queens Quay
development in September 2022 delivering 29 new Council homes in a key
regeneration area as part of a wider development which has delivered 146
new social rented homes.  The homes were the first residential properties to
be heated from the Council’s Queens Quay District Heating Network. This
development has been recognised at recent national housing sector awards
winning the following:-
• Best Residential Regeneration Project – Herald Property Awards
• Inside Housing Best Residential Development (Scotland)
3.3 These 29 new homes, are in addition to the completion of the Council’s first
fully dementia designed development at Creveul Court, Alexandria and other
exemplar developments in Haldane, Aitkenbar, Bellmsyre, Dumbarton
Harbour and St Andrews, Clydebank.  The Council have now completed 12
ITEM 9
Page 67

Page 68

new build developments since 2013 and are the largest developer of social
homes in West Dunbartonshire delivering 496 new homes and 101
acquisitions through our buyback scheme to date as outlined in Table 1
below: 
Table 1:  Completed Council New Build and Acquisitions
Project No. of
Units
Completion
Date
Granville Street (Phase 1), Clydebank 24 July 2013
Miller Road, Alexandria 15 October 2013
Granville Street (Phase 2), Clydebank 9 February 2014
Central Bellsmyre, Dumbarton 36 December 2014
Hillstreet Square, Dumbarton 37 August 2015
Second Avenue, Clydebank 40 April 2018
Creveul Court, Alexandria 22 April 2021
Aitkenbar Primary School 55 July2021
Haldane Primary School 58 August 2021
St Andrews, Clydebank  126 October 2021
Dumbarton Harbour, Dumbarton 45 December 2021
Queens Quay, Site B, Clydebank 29 August 2022
Buyback Acquisitions  101 Ongoing
Totals 597   
3.4 The Strategic Housing Investment Plan (SHIP) 2023-2027, outlining West
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach was approved by the Housing and
Communities Committee in November 2022. The SHIP outline plans to meet
the Council Administration’s aim of delivering 2500 new affordable and social
rented homes over the next 10 years.  The Council has received positive
feedback from the Scottish Government in respect of our SHIP.  The
development of the new SHIP is now complete and will be submitted to the
Housing and Communities Committee in November 2023 for approval. 
4. Main Issues 
More Homes West Dunbartonshire - Delivery Programme 
4.1 Building new affordable homes has an important role to play in revitalising
local economies and assisting with post-pandemic and economic recovery
plans, negating the impacts of the current cost of living crisis and combatting
poverty including child poverty.  It is also clear that the need for affordable
homes has and will increase in the current ongoing economic environment.
Our More Homes West Dunbartonshire approach is an ambitious plan that
aims to continue the positive momentum of the delivery of much needed
Council homes in West Dunbartonshire and will significantly assist the
Council’s aim to deliver 2500 new social and affordable homes by 2032. 
4.2 As the biggest affordable housing developer in West Dunbartonshire, the
Council has identified a number of future development sites for new council
homes to address existing and new housing need. The design of these homes
will further develop, improve and exceed current best practice, providing
sustainable homes using innovative technology and delivering on our low
Page 68

Page 69

carbon ambitions including passivhaus and other net zero carbon
opportunities. 
4.3 The Strategic Housing Investment Plan and HRA Capital Plan outlined the
plans the Council have for meeting their new build ambitions.  Some of the
initial plans were and continue to be impacted as a result of global issues
revised new build targets for the Council are outlined below:   
Table 2: Council New Build Programme 
*Current Planning figures 
4.4 Updates for each site are noted below: 
Clydebank East: 
Works commenced on this development on 23 January 2023, as reported to
the Housing and Communities Committee in February 2023 the initial
Site/Developer Number of
Units
Number of
Specialist
Provision 
Est Site
Start
Est Completion
Date
Clydebank
East,
Clydebank
88  9 
On Site 
January
2023
Spring 2025
Pappert,
Bonhill
Alexandria
26  3
February
24
Winter 2024/25 
Willox Park 17 17 Spring 24 Winter 2024/25
Bonhill Gap
Sites* 34 4 Spring 24 Winter 2024/25
Mount
Pleasant
19 19 Spring 24 Spring 2025
Queens Quay
Site C
100 10 Spring 24 Spring 2025
Clydebank
Health Centre*
38 5 Spring 24 Spring 2025
Bank Street,
Alexandria
22 22 Summer
24
Spring 25
Dennystoun
Forge
20 20 Summer 
24 
Winter 2024/25
Clydebank
Gap Sites*
(Gilmour
Avenue)
50 10 Summer
24
Summer 2025
Silverton
Regeneration
tbc tbc tbc tbc
Buyback
Scheme (60
per year)
300 36 2023/24 2027/28
714 units 155 units  
Page 69

Page 70

programme is for the remedial works and external drainage and this being
progressed in close collaboration with the Council’s wider regulatory role, a
construction site start will commence in early August.  The total programme
for the works will be 116 weeks. 
This development will deliver 88 new homes and has been designed to meet
the housing need within the wider West Dunbartonshire area, the table below
shows the housing mix: 
House Type Sustainability Standard Number of New
Homes
Wheelchair Bungalow
3bed/4person
Net Zero 3
House 3bed/5person Net Zero 15
House 4 bed/7person Net Zero 12
House 4 bed/9 person Net Zero 8
Cottage Flat 1 bed/2 person Net Zero 4
Cottage Flat 2 bed/3 person Net Zero 4
Flat 1 bed/2person Net Zero 16
Flat 2 bed/4 person Net Zero 24
Wheelchair Flat 1 bed/2person Net Zero 2 
All houses are designed to the Housing for Various Needs Standard (HfVN).
There will be 9 fully Wheelchair (WCH) accessible properties.  The 4 and 5
bedroom homes will all have ground floor double bedrooms.   
The development at Clydebank East will see the completion of a major
housing led regeneration of a key priority area identified in the Local Housing
Strategy and will be the Council’s first fully zero carbon housing development
and marks a significant milestone in our transition to net zero approved at the
August 2022 meeting of the Housing and Communities Committee.  Publicity
is planned to mark the significant milestone on terms of a site start. 
We are still currently engaged with the Scottish Government in terms of
finalising the grant award, as reported previously we have sought above
benchmark grant and our submission is currently being assessed by the
Scottish Government’s technical team. Our request is proportionate based on
the high levels of remediation costs but in terms of context our ask is
comparable with the grant awards made to the 2 housing association who
partnered the Council in the delivery of the new housing at Queens Quay. 
Pappert, Bonhill 
Following the review of the design proposals for the Pappert development the
housing mix is as follows:- 
House Type Sustainability Standard Number of New
Homes
House 3bed/5 person Passivhaus 6
House 3bed/5 person Net Zero 6
Page 70

Page 71

House 4bed/6person Net Zero 4
House 4bed/7person Net Zero 1
Flat 2bed/3person w/c Net Zero 3
Flat 1 bed/2person Net Zero 6 
Planning permission for this development was granted at the Planning
Committee of 20th September 2023, enabling a site start in February 2024. 
Willox Park, Doveholm, Dumbarton 
The development of 17 new homes to be delivered at the former care home
site continues within the design phase towards a full planning application In
November. 
The net zero heat strategy will be delivered by ground source heat pump, as it
was felt that this solution to be preferable than an air source heat pump for
each home.  The development will also utilise PV panels and a MVHR
system. 
There has been positive dialogue in terms of the current plans with both the
Willox Park residents and also planning officers.  Ongoing engagement will be
maintained with the current Willox Park residents throughout the delivery
process. 
Bonhill Gap Site Strategy 
The pre-planning application process has commenced on the development of
the 3 separate gap sites which are contained within this wider development. 
We have now procured engineering consultants as we move closer to a full
planning application. 
We have altered some of the initial design plans to incorporate a number of
adaptable 6/7 bed homes within the development to meet identified housing
need. 
Bank Street, Alexandria 
The Council is currently developing a proposal for 22 sheltered/amenity
housing units in partnership with the HSCP. This will include an options
appraisal in terms of the existing provision within the local area. 
The delayed appointment of the design team and engineering consultants
have pushed back the anticipated timescales of a planning application being
submitted to April 2024. 
Mount Pleasant, Old Kilpatrick 
The demolition of the former care home at the site completed in December
2022 ahead of schedule. 
Page 71

Page 72

CCG have been appointed as the main contractor following the Tendering
Committee in September, having been directly appointed from the Scotland
Excel Framework.  We await planning permission which will allow the
intended site start of March 2024 to be achieved. 
Queens Quay, Site C, Clydebank 
The Council has been developing a design to deliver a projected 20 units on
this site to complement the housing mix within sites A and B.  This
development will also be designed to meet low/zero carbon principles and
linked to the Queens Quay district heating network
.
Pre-planning response was received on the 25 February highlighting concern
of the WDC development proceeding in isolation. We have adopted a
proactive response to this issue and have developed masterplan diagrams
incorporating the surrounding sites and have carried out valuations on the
adjacent site to Queens Quay C with a view to purchasing additional land to
deliver more affordable housing in the Queens Quay regeneration site.  If this
is achieved we would seek to develop a mixed tenure approach to any
expanded development site delivering 100 new affordable homes. We are
urgently seeking discussion with CRL (Clydeside Regeneration Limited) to
progress the possibility of acquiring this additional land and will be able to
draw down Scottish Government grant to enable this. 
Clydebank Health Centre 
Our appointed design team are doing some feasibility work based on a
housing mix of 20 units of sheltered housing and 20 units to be a mix of family
housing and cottage flats within the development site. 
This is in advance of the demolition of the buildings within the site which is
currently scheduled for March 2024. 
Dennystoun Forge Gypsy/Traveller Site 
A submission was made to the Scottish Government for support funding from
their Gypsy/Traveller Accommodation Fund for significant improvements to
the Dennystoun Forge site, including new energy efficient chalet type
accommodation following a consultation exercise with site residents. 
However, we were notified that this submission was unsuccessful at this point.
We have since engaged the Scottish Government following the outcome of
this and have provided additional information to the Scottish Government in
support of the application.   
In another positive development the Council’s Housing Development Team
has been providing support to the tenants within the Dennystoun Forge site to
establish a registered tenants association, the absence of a recognised
tenants group and ongoing site presence was seen as a relative weakness in
terms of the initial submission.  
Page 72

Page 73

We anticipate that following the new information provided to support our
application for funding Scottish Government officials will reassess the
application before the end of 2023. 
Queen Mary Avenue, Clydebank (Clydebank Gap Sites) 
The transfer of the site at Queen Mary Avenue, Clydebank with vacant
possession at the cost of £140,000 from the Council’s General Fund to the
Housing Revenue Account for the delivery of new Council homes was
approved at the February meeting of the Housing and Communities
Committee and has now been concluded.  We are preparing a demolition
programme to allow the site to be cleared as soon as is practically possible
following the recent departure of Council staff teams who were using the
premises.  The plans for demolition will run in parallel with a feasibility study in
terms of the future development.   
Gilmour Avenue, Hardgate (Clydebank Gap Sites) 
As part of the wider development of our Clydebank Gap Site strategy we
identified a HRA gap site in the Hardgate area at Gilmour Avenue.  The site
was previously the location of timber garages on concrete bases.  These have
long since been demolished and the site has been beset with fly tipping
issues for a number of years. The proposed development would see two three
bed semi-detached homes to be delivered utilising modular construction
methods.  A planning application has been submitted and we await approval. 
Silverton Regeneration 
Discussions are ongoing which will allow the Council to purchase the last
remaining privately owned property in the defective surplus blocks this will
allow us to demolish and consider opportunities to deliver new housing within
the Silverton area.  We will highlight proposals in future update reports to the
Housing and Communities Committee. 
Buyback Programme 
The Council’s buyback programme which incorporates the Mortgage to Rent
Scheme purchased 16 new homes in 2022/23.  In 2023/24 to date we have
already 22 new homes at an average purchase cost of £100,000. 
In 2023/24 and following approval of the Strategic Housing Investment Plan
by the Housing and Communities Committee in November 2022 and
subsequently the decision by West Dunbartonshire Council in March 2023 to
deliver an enhanced Housing Capital Investment Programme including
additional funding for buyback purchases we are now scaling up ambition
around our buyback programme.  In 2023/24 and in each of the subsequent
years up to and including 2027/28 we plan to deliver 60 new homes each year
meaning a minimum of 300 new Council homes to meet identified need.   
Page 73

Page 74

The additional funding that was approved by the West Dunbartonshire Council
meeting of 1 March 2023 will target larger family homes to meet this specific
need.  To meet these defined targets we will add additional resources within
the Housing team, and we will also refresh our Buyback Policy.  This update
policy will be submitted to the meeting of the Housing and Communities
Committee in February 2023. 
4.5 The Housing Development Team are continuously looking for opportunities to
provide additional new build council homes and will bring any potential site to
the Housing and Communities Committee with as much information as
possible as part of the regular More Homes update paper. 
5. People Implications 
5.1 An additional Senior Housing Development Officer role is required to deliver
the increase and scaling up of the Council’s buyback programme.  This will be
met within the existing resources.   
6. Financial and Procurement Implications 
Financial 
6.1 On 1 March 2023 Council approved the Housing Capital Programme 2023-
2028 which saw significant resources committed to the delivery of new council
homes in West Dunbartonshire.  An expenditure budget of £155m for the
affordable housing supply programme is factored into the HRA Capital
Programme this will be updated to reflect the income and expenditure
highlighted within this report.  As it currently stands, it is anticipated that this
programme will complete on project life budget. 
6.2 The uprated Affordable Housing Supply Programme grant benchmark
assumptions were put in place during 2023/24.  The new benchmark
assumptions are highlighted below:- 
RSL social rent  £91,182 
(3 person equivalent) 
Council social rent  £83,584 
(3 person equivalent) 
RSL mid-market rent  £62,542 
(3 person equivalent) 
Council mid-market rent  £57,281 
(3 person equivalent)
Page 74

Page 75

6.3 In addition the following benchmark grant levels are available for additional
quality measures as follows:-   
Delivering homes to Section 7,
Silver Level, of the 2019  Building
Regulations in respect of Energy for
Space Heating (that is, full Bronze 
Level plus Aspect 2 of Silver Level).
£2,338 per home
(3 person 
equivalent 
benchmark) 
Provision of balconies within flatted
developments to enable people to 
sit outside, where the provision of
private or communal outdoor space 
cannot otherwise be accommodated
£4,676 per home
(3 person 
equivalent 
benchmark)
ark)
Provision of space for home working 
or study – to note that this 
benchmark does not apply to
projects meeting current Housing for 
Varying Needs standards. 
In all other circumstances, grant 
applicants should demonstrate that
additional space is necessary to 
deliver this measure in order for this
benchmark to apply i.e. it is not 
possible to incorporate this within
the design of the homes under 
current space standards. 
£4,092 per home 
(3 person 
equivalent 
benchmark) 
Digitally-enabling – when a tenant
gets the keys to their home they 
should be able to arrange for an
internet connection to ‘go live’ 
without the internet service provider
having to provide additional 
cabling to the premises.
£351 per home
(3 person 
equivalent 
benchmark) 
Installation of ducting infrastructure
for electric vehicle charge point 
connectors. 
£585 per 
connector(3 person 
equivalent 
benchmark 
Installation of electric vehicle charge
points (excluding installation of 
ducting infrastructure)
£585 per 
connector(3 person 
equivalent 
benchmark 
Installation of automatic fire suppression
systems. 
£3,507 per home
(3 person 
equivalent 
benchmark)
Page 75

Page 76

Installation of heating systems which
produce zero direct emissions at 
the point of use. 
£4,676 per home
(3 person 
equivalent 
benchmark 
6.4 Notwithstanding the expected increase in benchmark assumptions Housing
and Finance Officers will continue to assess the ongoing affordability of future
developments within the context of the Housing Revenue Account Business
Plan. 
Procurement 
6.5 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted within 4.4 of this report will
continue to be prioritised. 
6.6 Where the contract award is less than £213,000, authority is delegated to
the Chief Officer in consultation with the Procurement Manager to instruct the
award of contracts for the planned revenue and capital spend detailed in this
report to suppliers providing the most economically advantageous offer to the
Council. 
6.7 All procurement activity carried out by the Council in excess of £2m is
subject to a contract strategy. The contract strategy for new housing
development within the HRA Capital Programme will be developed by the
Corporate Procurement Unit in consultation with Housing Development
Officers. The contract strategy will include, but is not limited to; contract
scope, service forward plan, the market, procurement model and routes –
including existing delivery vehicles, roles and responsibilities, risks, issues
and opportunities and on-going contract management. Opportunities to
maximise the positive social, economic and environmental impact for the
Council through the relevant procurement processes will be developed in line
with procurement policy. 
7. Risk Analysis 
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis. 
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel. 
8. Equalities Impact Assessment (EIA) 
Page 76

Page 77

8.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment. 
9. Consultation 
9.1 As part of our previous rent consultation exercise, 92% of respondents
indicated their support for the Council’s ambitious plans to deliver the Housing
Revenue Account (HRA) new council house build programme. In addition,
there was positive support for the wider delivery of new build housing as part
of the recent Local Housing Strategy.  Regular updates on new build
development are provided to the West Dunbartonshire Tenants and Residents
Organisation at the bi-monthly liaison meetings. 
10. Strategic Assessment 
10.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire. 
10.2 Having considered all the Council’s strategic priorities, this report and the
provision of new supply social housing for rent contributes greatly to all
strategic priorities. 
Peter Barry
Chief Officer, Housing and Employability
Date: 8 November 2023 
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk   
Appendices: None 
Background Papers: West Dunbartonshire Council’s Local Housing Strategy     
Local Housing Strategy, Health Inequalities Impact
Assessment 
Wards Affected: All 
Page 77

Page 78

Page 78

Page 79

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee:  22 November 2023
___________________________________________________________________
Subject:   Scottish Social Housing Charter/Regulation of Social Housing in
Scotland Progress Report
1. Purpose
1.1 The purpose of this report is to provide members with a mid-year update in terms
of how we are performing against the Scottish Social Housing Charter indicators
and to provide an update into how we are meeting the requirements of the
Scottish Housing Regulator’s Regulatory Framework.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the contents of this report recognising the mid-year progress in terms
of meeting the Outcomes of the Scottish Social Housing Charter;
(ii) Notes that following the approval of our Annual Assurance Statement by
the Committee on 25 October 2023 that this has now been submitted to
the Scottish Housing Regulator as per our regulatory requirement;
(iii) Notes that our annual Charter Performance Report has now been published
and a summary will be provided to all tenants with the winter edition of the
Housing News; and
(iv) Notes that a full annual progress report on the Scottish Social Housing
Charter will be submitted to the August 2024 meeting of the Housing and
Communities Committee this will include our Annual Assurance
Statement.
3. Background
3.1 The Scottish Government’s first Scottish Social Housing Charter (SSHC) came into
force in April 2012. This was reviewed during 2016 and again in 2021 and the
resulting revised SSHC was subsequently approved by the Scottish Parliament and
has effect from 1 November 2022.
3.2 The purpose of the SSHC is to help improve the quality and value of the
services that social landlords provide by:
• Stating clearly what tenants and other customers can expect from social
landlords and helping them to hold landlords to account;
• Focusing the efforts of social landlords on achieving outcomes that matter to
their customers; and
ITEM 10
Page 79

Page 80

• Providing the basis for the Scottish Housing Regulator (SHR) to assess
and report on how well landlords are performing.
3.3 A revised Regulatory Framework and reporting timetable for the SSHC came
into effect on 1st April 2019 is outlined below:
When Who What
Throughout year Housing Services
/Tenants
Assess performance against the Charter
Outcomes
May each year Housing Development Submission of Annual Return on the Charter
to Scottish Housing Regulator
August each year Scottish Housing
Regulator
Publishes a report about each social landlord
with key data from its ARC on their website
October each year
Convener of Housing
and Communities
Committee
Submission of Annual Assurance Statement
to the Scottish Housing Regulator
October each year Housing Development Publication of annual Charter Performance
Report for tenants and other customers
by April each year
Scottish Housing
Regulator 
Publish an Engagement Plan for each
landlord, based on performance against
Charter Indicators and outcomes
by April each year Scottish Housing
Regulator 
Publish a report on the analysis of the
sector’s performance in achieving the Charter
outcomes
3.4 On the 6 August 2014, Members of the Housing and Communities Committee
agreed that twice yearly reports be provided as follows:
• August Committee - Scottish Social Housing Charter Annual Update
Report; and
• November Committee - Scottish Social Housing Charter Annual
Benchmarking Report and Mid-Year Progress Report – (April-September).
3.5 As our AAS needs to be approved by the Committee and submitted to the SHR
by 31 October each year, a special meeting of the Committee was arranged on
25 October 2023 to ensure that we met this timescale. It was agreed that a
further progress report with a mid-year update would be provided to the
November 2023 Committee meeting.
4. Main Issues
4.1 The key areas of focus in relation to the SSHC highlighted in this report are as
follows:
• Mid-year progress in relation to how well we are achieving the Charter
Outcomes;
• An update on the submission of our AAS to the SHR; and
• An update on the publication of our annual Charter Performance Report
for tenants and other customers.
Page 80

Page 81

Mid-year progress achieving the Charter Outcomes
4.2 The SHR now uses 32 Charter Performance Indicators to monitor the
performance of all social landlords against the Charter outcomes and standards.
4.3 A comprehensive assessment of 2022/23 performance against the Charter has
been carried out which informed a Charter Improvement Plan which is being
implemented across all areas of the housing service with the objective of continuing
to improve services for our tenants and customers.
4.4 Based on this exercise and the content of our most recent Engagement Plan, the
HIB is monitoring on a monthly basis key work-streams aimed at driving
improvements in the following areas:
• Compliance with the Scottish Housing Quality Standard (SHQS);
• Services for people who are homeless, including breaches of the UAO;
• Tenant satisfaction;
• Void management; and
• Complaints response times.
4.5 Detailed benchmarking was provided to the HACC on 25 October 2023 and the
table below provides a more local analysis comparing West Dunbartonshire
Council’s performance against comparable neighbouring housing organisations (3
neighbouring local authorities Renfrewshire, East Dunbartonshire and Stirling and
River Clyde Homes operating in Inverclyde).
Indicator
West
Dunbartonshire
Council
East
Dunbartonshire
Council
Renfrewshire
Council
Stirling
Council
River Clyde
Homes
HOMES AND RENT
Total Number of Homes
10,422 3,725 12,216 6,035 6,140
Rent increase
5.0% 4.2% 5.5% 2.9% 5.0%
TENANT SATISFACTION
% of overall satisfaction with the service
61.3% 75.9% 82.4% 90.9% 91.3%
% of tenants who feel their landlord is good at keeping them informed about their services
75.8% 82.6% 91.1% 98.4% 96.2%
% of tenants satisfied with the opportunities given to participate in decision making
69.2% 78.9% 99.0% 97.5% 94.9%
QUALITY AND MAINTENANCE OF HOMES
% of homes meeting the SHQS
32.2% 53.5% 67.9% 87.0% 79.2%
Emergency Repairs - average number of hours
4.5 hours 4.0 hours 9.8 hours 7.4 hours 3.1 hours
Page 81

Page 82

Non-Emergency Repairs - average number of days
9.3 days 11.7 days 6.1 days 6.6 days 10.3 days
Repairs – Right First Time
85.7% 81.9% 90.0% 92.2% 86.7%
% of tenants who have had repairs carried out on the last 12 months who were satisfied with
repairs and maintenance service
87.3% 91.6% 73.3% 88.1% 92.2%
Indicator
West
Dunbartonshire
Council
East
Dunbartonshire
Council
Renfrewshire
Council
Stirling
Council
River Clyde
Homes
NEIGHBOURHOODS
% of anti-social behaviour cases resolved within locally agreed targets in the last year
97.1% 100% 98.0% 84.6% 95.9%
VALUE FOR MONEY
Rent collected as % of rent due
98.5% 99.0% 100.0% 99.9% 97.8%
% of Rent due not collected  through homes being empty
1.3% 1.0% 1.9% 1.5% 4.8%
Average length of time in days taken to re-let homes in the last year
33.6 days 59.5 days 60.6 days 76.9 days 209.9 days
4.6 Performance improvement targets for 2023/24 for all the Charter Indicators
have been agreed based on robust benchmarking information and previous
performance. These targets challenge the housing service to meet our
ambition to be one of Scotland’s top performing landlord organisations.
4.7 Of the 32 Charter Indicators, 10 are reported on a six monthly basis to the
Housing and Communities Committee, alongside 3 indicators relating to
homelessness (which are not currently part of the Charter return).
4.8 A summary of performance for the period April 2023 – September 2023 for these
indicators is outlined in the table below:
Status Key
Scottish Social Housing Charter
Mid-year Performance Report
(Apr 2023 – Sep 2023)Target Met or
exceeded
Target narrowly
missed (within
agreed range)
Target missed
Estate Management, Anti-Social Behaviour,
Neighbour Nuisance and Tenancy Disputes
Mid-year
Target
Mid-year
Value Status
% of anti-social behaviour cases resolved 91% 91.5%
Repairs, Maintenance and Improvements Mid-year
Target
Mid-year
Value Status
Average length of time taken to complete
emergency repairs 6 hours 5.35 hours
Average length of time taken to complete non-
emergency repairs 8.4 days 11.8 days
Page 82

Page 83

% of reactive repairs carried out completed right
first time 90% 85.6%
How many times in the reporting period did you not
complete a gas safety check within 12 months 0 0
% of tenants satisfied with the repairs and
maintenance service 86% 99.6%
Value for Money Mid-year
Target
Mid-year
Value Status
Average time to re-let properties 30 days 45 days
% of rent due lost through homes being empty
during the last year 1.0% 1.08%
Gross rent arrears as a % of total rent due 10.0% 9.84%
Tenancy Sustainability Mid-year
Target
Mid-year
Value Status
% of new tenants who maintained their tenancy for
at least 12 months 94% 94.6%
Homeless People Mid-year
Target
Mid-year
Value Status
% of all homeless cases who received a decision
within 28 day target 95% 99.2%
% of households requiring temporary
accommodation, to whom an offer was made 100% 100%
Breaches of the Unsuitable Accommodation Order 0 60
4.9 Of these 13 key indicators, 8 are meeting the targets set, with another 2
narrowly missing this target. Overall this translates to 77% of these key
indicators either meeting or almost achieving target.
4.10 Whilst not usually reported on a six monthly basis to Committee, given that
they are a key area of focus for the Housing Improvement Board, the table
below gives an update in terms of performance on complaints response times
and on compliance with the Scottish Housing Quality Standard:
Status Key
Scottish Social Housing Charter
Mid-year Performance Report
(Apr 2023 – Sep 2023)Target Met or
exceeded
Target narrowly
missed (within
agreed range)
Target missed
Communication Mid-year
Target
Mid-year
Value Status
Average time in working days to respond to a
Stage 1 complaint 5 days 6 days
Average time in working days to respond to a
Stage 2 complaint 20 days 11 days
Quality of housing Mid-year
Target
Mid-year
Value Status
% of properties compliant with Scottish Housing
Quality Standard 69% 42.5%
Page 83

Page 84

Annual Assurance Statement (AAS)
4.11 The AAS requires landlords to state they are meeting regulatory requirements
and that they are compliant with the legal requirements and statutory guidance
relevant to the sector. Any areas of material non-compliance should be
highlighted, alongside actions being taken to address these.
4.12 As reported to the special meeting of the HACC on 25 October 2023, we have
highlighted the following areas in this years’ AAS:
• Low level of compliance with SHQS;
• Low levels of tenant satisfaction; and
• Reported breaches of the UAO
4.13 Following the approval by the special meeting of the HACC of the content of
our AAS, it was signed by the Convener on behalf of the Committee and
submitted to the SHR as per the regulatory requirement.
4.14 As per the SHR guidance, our AAS will be published to ensure that it is
accessible to tenants and other customers.
Charter Performance Report
4.15 The SHR requires all social landlords to produce an Annual Charter
Performance Report for their tenants and other customers no later than 31
October each year.
4.16 The statutory regulatory framework states that that this report should include:
• An assessment of performance in delivering the Charter Outcomes;
• Relevant comparisons with previous years, other landlords and national
performance; and
• How and when the landlord intends to address areas for improvement.
4.17 In preparation for our first report in 2014, a working group of tenants and
officers was established and successfully:
• Agreed how tenants wished to be involved;
• Agreed which indicators will feature in the report; and
• Agreed the best style and format to ensure that the report is user friendly
and easy to understand.
4.18 Further engagement was carried out with tenant representatives during 2019
to review and update this report, in line with the revised Charter coming into
effect. This consultation influenced the style, content and format of our Annual
Charter Report and also the update of the Service Standards that are in place
across housing services and which are reported regularly to tenants and other
service users (via the Council website and by a performance insert provided
with Housing News).
Page 84

Page 85

4.19 This years’ report was published online within the required timescale. The
narrative in the report is based on the annual self-assessment exercise of our
performance and a summary of the report will be sent to every tenant with the
winter edition of the Housing News.
5. People Implications
5.1 There are no people implications as a result of the report. Delivery on the
requirements of the SSHC is managed from within existing staffing resources
within the Housing Development Team.
6. Financial and Procurement Implications
6.1 There are no direct financial or procurement implications in relation to this report.
The improvement plan informed by the Charter self-assessment exercise will be
delivered from within existing budgets.
7. Risk Analysis
7.1 There is a significant risk that failure to respond appropriately to the
requirements of the SSHC would attract an adverse reaction from the SHR and
may have wider consequences for the Council in the context of Best Value.
7.2 At the time of writing we expect out next Engagement Plan to be published in
March 2024.
8. Equalities Impact Assessment (EIA)
8.1 Equalities legislation requires that new or significantly changing policies or
services and financial decisions should be subject to an assessment of their
impact on the wellbeing of certain groups of people.  The recommendations
within this report do not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
9. Consultation
9.1 The Council has in place a well-established and proactive tenants and residents
organisational structure.  The WDTRO meet with the Council (chaired by the
Convener of the Housing and Communities Committee) on a bi-monthly basis to
discuss all issues relating to the Housing Service.
9.2 There remains a strong appetite among tenants and customers to continue to
participate actively to improve housing services in West Dunbartonshire. This
is reflected in the successful partnership approach adopted to develop the
Charter Performance Report and the on-going activities of the WDTRO, the
Joint Rent Group and the West Dunbartonshire Scrutiny Panel.
9.3 The Council is committed to ensure effective consultation continues and will
support arrangements to increase tenant scrutiny activities and assess our
performance in line with the statutory requirements under the SSHC and the
Page 85

Page 86

SHR’s regulatory framework.  Our approach was again commended via an
external validation exercise by the Tenant Participation Advisory Service
(TPAS) Scotland, which again awarded West Dunbartonshire Council a Gold
Accreditation for excellence in tenant participation in early 2023.
10. Strategic Assessment
10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all five strategic priorities and specifically to improve local
housing and environmentally sustainable infrastructure.
Peter Barry
Chief Officer, Housing and Employability
Date: 8 November 2023
___________________________________________________________________
Person to Contact:  John Kerr – Housing Development and Homelessness
Manager, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Appendices: None
Background Papers: Scottish Housing Regulator WDC Landlord Report 2022-23
West Dunbartonshire Council | Scottish Housing Regulator
WDC Annual Assurance Statement October 2023
Annual Charter Performance Report for Tenants and    
other Customers 2022/23, West Dunbartonshire Council,
October 2023
https://www.west-dunbarton.gov.uk/council/our-
performance/service-performance/housing-services-
performance-information/charter-performance-report/  
West Dunbartonshire Tenant Participation Strategy 2021-2024
“Involving You”
https://www.west-dunbarton.gov.uk/council/strategies-plans-
and-policies/housing/tenant-participation-strategy/ 
Scottish Social Housing Charter – West Dunbartonshire
Council Annual Assurance Statement,
Report by Chief Officer, Housing and Employability,
Housing and Communities Committee, 
25 October 2023
Wards Affected:   All 
Page 86

Page 87

West Dunbartonshire Council
Report by Chief Officer Housing and Employability 
Housing and Communities Committee:  22 November 2023
Subject:  West Dunbartonshire Local Housing Strategy 2022-27- Annual
Progress Report
1. Purpose
1.1  This report provides committee with a progress report on the More Homes
Better Homes West Dunbartonshire Local Housing Strategy 2022 – 2027.
2. Recommendations
2.1 It is recommended that the Committee:-
i) Acknowledges the progress made in meeting the aims and objectives of The
More Homes Better Homes West Dunbartonshire Local Housing Strategy
2022 - 2027 and notes the contents of the Local Housing Strategy Progress
Report – October 2023 (appendix 1).
3. Background
3.1  Under the Housing (Scotland) Act 2001 Local Authorities are required to carry
out a comprehensive assessment of housing needs and conditions and to
produce a Local Housing Strategy (LHS) to address the issues identified.
3.2 The West Dunbartonshire LHS was approved by Housing and Communities
Committee and submitted to the Scottish Government in November 2021.
This LHS covers the period 2022 – 2027.
4. Main Issues
4.1  This annual Progress Report provides an update on progress on the five
key themes contained in the Local Housing Strategy, namely:
• Housing Need and Demand;
• Promoting Good Quality Housing;
• Homelessness and Housing Options;
• Sustainable and Supportive Communities; and
• Supported, Specialist and Particular Housing Needs.
ITEM 11
Page 87

Page 88

4.2  The Scottish Government’s Housing to 2040 strategy provides the backdrop to
the much of the policy contained in the LHS.
4.3 The Scottish Government carried out a review of the LHS and provided
feedback highlighting areas of strengths as well as areas for improvement.
4.4 The performance management report has been drawn up to monitor
progress on the delivery of the key actions arising from the LHS and seeks to
address areas recommended for improvement.   The performance
management report is attached here as Appendix 1: LHS 2022-2027
Progress Report October 2023.   Progress on the key actions of the report
are described below.
5. Housing Need and Demand
5.1 The LHS is required to be guided by a Housing Needs and Demand Analysis
(HNDA).  West Dunbartonshire Council is part of the Glasgow City Region
Housing Market Partnership (HMP) responsible for the preparation of the
HNDA.   Scottish Government feedback was critical of our use of outdated
HNDA2 data.  The HMP has recently published its third Glasgow and the
Clyde Valley Housing Need and Demand Assessment (HNDA3) covering the
period to 2040. HNDA3 replaces HNDA2 which was published in 2015.   
As soon as HNDA3 is signed off by the Scottish Government, we will be in a
position to use its up-to-date information in any subsequent LHS updates.
5.2 A key aim of the LHS is to maximise the delivery of new affordable housing in
West Dunbartonshire, including by increasing the Council’s own new build
programme. The LHS sets an annual Housing Supply Target of 230 new
houses across all tenures, with a minimum 80 being for social rent.  However,
positively the 2022 Housing Land Audit recorded 383 housing completions of
which 340 were social rent. In terms of delivering new social housing West
Dunbartonshire was the sixth highest landlord in terms of delivery of new
social housing in 2021/22.   
5.3 It should be noted that these outcomes vary greatly year on year and
gathering trend information is a reliable means of gauging output and
ensuring flexibility to meet current demand and market conditions.   
5.4 The Strategic Housing Investment Plan has been updated and the
latest version is being submitted for approval to the November 2023
Housing and Communities Committee.
5.5 We are carrying out work to better understand the housing demands of
older people and what form provision should take and this will be
reported to a future Housing and Communities Committee.
5.6 We are considering on how best to signpost to Scottish Government
guidance for those interested in self-building their own home.
Page 88

Page 89

6. Promoting Quality Homes
6.1 We continue to provide energy advice to households using various
channels such as social media, drop in sessions at libraries and housing
news. The increasing cost of energy has seen increased demand for
advice.
6.2 A number of retrofit energy efficiency schemes are underway including
installing ASHP, trialing internal wall insulation and we will continue to
monitor and evaluate.
6.3 On their completion, our energy efficient new build projects will be
evaluated with a view to better understanding best practice.  The 2023
review of the WDC Design Standard proposes further improvements to
the energy efficiency of affordable homes provided through the SHIP.
6.4 We continue to carry out energy improvement projects both HRA and
Private Sector via the HRA capital programme and grant funding
opportunities respectively.
6.5 A review of the Design Standard has been carried and will go to the
November 2023 Housing and Communities Committee for approval.
7. Homelessness and Housing Options
7.1 The Council’s homeless prevention protocols have been reviewed and
updated. A review of the implementation of our Domestic Abuse Policy
will undertaken.
7.2 The Scottish Government intends to draft a New Housing Bill which will
include a new Homelessness Prevention Duty, this will have a
significant impact on service delivery for all local authorities including
West Dunbartonshire Council and a service redesign is currently being
developed to reflect these additional requirements.
7.3 All the actions for year 4 of the Rapid Rehousing Transition Plan-RRTP
2019 – 2024 (RRTP) have been delivered against the most demanding
and challenging circumstances.
7.4 RRTP funding continues to be prioritized for supported tenancies
including Housing First.
8. Places and Community
8.1 Planning has developed a tool that allows us to analyse neighbourhoods
and their access to amenities and which can help inform decision
making in respect of these areas.
8.2 The performance report records progress on the eleven regeneration
Page 89

Page 90

areas highlighted in the LHS.  A number of the areas have or will benefit
from new development meanwhile others will benefit from existing asset
strategies such as the enhanced multi storey strategy or focused capital
investment such as External Wall Insulation (EWI). 
8.3 During the period of the LHS we report that 33 homes have been
brought back into use through our Empty Homes Strategy. 
8.4 During the period of the LHS we report that 38 homes have been
brought back into use through our.buy back policy.
8.5 We have carried out a review of the consultation information relating to
the New Deal for Tenants Act.
9. Supported, Specialist and Particular Needs Housing
9.1 Some work has been done in conjunction with the HSCP to better
understand the housing needs of older people and how this should be
reflected in our future housing strategies.
9.2 We are in discussion with the HSCP to consider opportunities to use
new technologies to support people in their homes.  We recognise that
more work is required in this area.
9.3 A review of the Scottish Government’s new guidance on home
adaptations has been carried out.
9.4 We have not yet reviewed the modules on I-learn due to resource
limitations but we plan to take this forward during 2023/2024.
9.5 Due to time and resource limitations, we have not yet formalised a 6-
monthly liaison meeting between Housing and the HSCP.
9.6 We are now meeting regularly with residents of the Dennystoun Forge
gypsy/traveller community.  Significant progress has been made in
understanding their needs and we are advancing plans for large scale
improvement works.
9.7 We have enabled the Dennystoun Forge community to engage with
Planning over the preparation of the forthcoming Local Development
Plan including any possible need for transit sites.
10. People Implications
10.1  There are no direct implications associated with this report.
11. Financial Implications
11.1  There are no direct financial implications in relation to this report, although the
Page 90

Page 91

delivery of the LHS will require the bringing together of a number of resource
streams from the Council and partner organisations.   
12. Risk Analysis
12.1  Ongoing economic uncertainties remains a concern for the delivery of a
number of the LHS work streams.
13.3 Inflationary pressure and Brexit related labour issues continue to be
features of the economy, not least in the building sector.
13. Equalities Impact Assessment (EIA)
13.1  An Equalities, Health and Human Rights Impact Assessment was carried
out on the Local Housing Strategy and found no substantive negative
impacts.  The current assessment is available on the Council’s website.
14. Consultation
14.1 The West Dunbartonshire Local Housing Strategy 2022 – 2027 was the
subject of a widespread consultation exercise which is summarised in a
report on the Council’s website.
15. Strategic Assessment
15.1  The ongoing implementation of the West Dunbartonshire Local Housing
Strategy contributes greatly to all the Council’s strategic priorities.
Peter Barry, Chief Officer, Housing and Employability
Date: 8 November 2023
Person to Contact:  John Kerr – Housing Development and Homelessness
Manager, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Appendix:  Appendix  1 -    West Dunbartonshire  Local  Housing
Strategy 2022–2027 Annual Progress Report, October
2023.
Background Papers: West Dunbartonshire  Local  Housing Strategy 2022–2027
and EIA 
Wards Affected:  All
Page 91

Page 92

LHS 2022-27 - Year 1 (Actions)
Report Author: Emily Dorrian
Generated on: 25 October 2023
1. Housing Needs and Demand
Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/1.1 Report on social and private housing
delivery targets 31-Mar-2023
The 2022 Housing Land Audit recorded 383 housing
completions in the year 01/04/21>31/3/2022. There were
43 private completions and 383 social rented completions
recorded. Note: owing to different ways of recording, the
social rented figure differs from that recorded by Housing
Services, which showed 456 social rented completions in
the reporting year 2021/22.
Alan
Williamson
H&E/LHS/22-23/1.2
Review and update the strategic
housing investment programme
(SHIP) process annually
31-Mar-2023 Jamie Dockery
H&E/LHS/22-23/1.3
Collect demographic information on
these groups and estbalish demand
potential profile
31-Mar-2023
We have previously worked with a consultant to consider
demand for older people's accommodation and we are
running some viability exercises on alternative rental and
ownership models for these groups. 
Emily Dorrian
H&E/LHS/22-23/1.4 Review the Scottish Government
Guidance in relation to self build 31-Mar-2023
The 'Building your own home' guidance on mygov.scot
(https://www.mygov.scot/building-your-own-
home) has been reviewed. This could be signposted to or
our own version created if/when the Council wants to
promote self-build. The requirement, under the Planning
(Scotland) Act 2019 to prepare and maintain a register of
persons interested in acquiring land for self-build housing
has not yet been enacted.
Alan
Williamson
ITEM 11 - APPENDIX 1
Page 92

Page 93

2. Promoting Quality Homes
Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/2.1
Provide energy advice to households
utilising different channels of
communication
31-Mar-2023
H&E/LHS/22-23/2.2a Develop, track and share the results
of retrofit pilot projects 31-Mar-2023
We have a number of retrofit pilot projects underway. This
year we have installed IWI, underfloor insulation, ASHP,
solar and battery storage.
Emily Dorrian
H&E/LHS/22-23/2.2b
Develop, track and share the results
of new build energy efficient home
projects
31-Mar-2023
new build projects have been delayed getting onto site but
working to update the design standard to include more
energy efficiency measures and requirements.
Emily Dorrian
H&E/LHS/22-23/2.3
Number of households supported
through energy efficiency schemes &
opportunities
31-Mar-2023
Continuing to support households with energy advice,
energy improvement projects both HRA and Private sector
via HRA investment programme and grant funding
opportunities for private sector.
Alan Young
H&E/LHS/22-23/2.4 Review design standard and keep
update to date with best practice 31-Mar-2023 Design standard has been reviewed and will be put out for
consultation this autumn (2023) Jamie Dockery
3. Homelessness and Housing Options
Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/3.1a
Review and update homeless
prevention protocols (hospital,
prison, care leavers).  Review
implementation of Domestic Abuse
Policy.
31-Mar-2023 Complete
Stefan
Kristmanns;
Claire McKay
H&E/LHS/22-23/3.1b Await and respond to SG feedback on
Prevention Duty Consultation. 31-Mar-2023 Complete
Stefan
Kristmanns;
Claire McKay
H&E/LHS/22-23/3.2
Deliver actions and objectives for
year 4 as set out in the rapid
rehousing transition plan (2019-
2024)
31-Mar-2023 Complete Claire McKay
H&E/LHS/22-23/3.3 Utilise RRTP funding for housing first
and supported tenancies. 31-Mar-2023 Complete John Kerr;
Claire McKay
Page 93

Page 94

4. Places and Communities
Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/4.1
Develop a tool to allow us analyse
neighbourhoods and their access to
amenities
31-Mar-2023 Joshua Doyle
H&E/LHS/22-23/4.2a Haldane - Regeneration Area 31-Mar-2023
This area has benefited from capital asset investment in
energy efficiency measures including external wall
insulation.  Owners and landlords have been assisted with
SG area based funding where appropriate.
Emily Dorrian
H&E/LHS/22-23/4.2b Bonhill - Regeneration Areas 31-Mar-2023
This is an annual action.  This year in Bonhill we are
developing a whole house retrofit option and working
towards delivering new energy efficient homes in Pappert
and at a number of gap sites.  Housing strategy have also
been working on enhancing some green spaces as part of
the new developments.
Emily Dorrian
H&E/LHS/22-23/4.2c Brucehill - Regeneration Area 31-Mar-2023
This area has benefited from capital asset investment in
energy efficiency measures including external wall
insulation.  Owners and landlords have been assisted with
SG area based funding where appropriate.
Emily Dorrian
H&E/LHS/22-23/4.2d Westcliff - Regeneration Area 31-Mar-2023
This area has benefited from capital asset investment in
energy efficiency measures including external wall
insulation.  Owners and landlords have been assisted with
SG area based funding where appropriate.
Emily Dorrian
H&E/LHS/22-23/4.2e Castlehill - Regeneration Area 31-Mar-2023
This area has benefited from capital asset investment in
energy efficiency measures including external wall
insulation.  Owners and landlords have been assisted with
SG area based funding where appropriate.
Emily Dorrian
H&E/LHS/22-23/4.2f Bellsmyre - Regeneration Areas 31-Mar-2023 Caledonia HA continue to play an active role in Bellsmyre
developing new, energy efficient new homes. Emily Dorrian
H&E/LHS/22-23/4.2g Mountblow - Regeneration Areas 31-Mar-2023
The regeneration of the blocks at Brunswick, Montreal and
Quebec houses is progressing well with only a handful of
households left to be rehomed.  Further the multi storey
strategy will be enhancing Mountblow House alongside the
blocks at Littleholm.
Emily Dorrian
H&E/LHS/22-23/4.2h Dalmuir - Regeneration Areas 31-Mar-2023
We have consulted on a multi-storey strategy which
includes the 6 blocks in Dalmuir and will deliver a number
of enhancements to these homes. The team at the Queens
Quay district heating network are investigating connecting
these blocks to the district heating system alongside some
homes owned by Clydebank HA in the area.
Emily Dorrian
Page 94

Page 95

Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/5.1
Research and formulate a strategy
which reflect best practice housing
for older households
31-Mar-2023
Whilst we have done some of the work required for this
project we have not put in place a strategy.  HSCP
however have been doing a lot of strategic work and this
will inform our strategy and provide it with a good
foundation.
Emily Dorrian
H&E/LHS/22-23/5.2 Research potential opportunities to
utilise technology to support people. 31-Mar-2023
similarly to the 6 monthly meetings with HSCP this has
been constrained by resources but work has been
progressing informally.
Margaret-Jane
Cardno
H&E/LHS/22-23/5.3
Review the updated guidance for
adaptations when it is made
available from SG.
31-Mar-2023 Updated guidance on adaptations reviewed. Alan Young
Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/4.2i Drumry - Regeneration Areas 31-Mar-2023
Drumry structural works have completed another block,
move back in has been delayed by meter issues.  The
multi storey strategy also covers the blocks in North
Drumry and will be working on enhance these.
Emily Dorrian
H&E/LHS/22-23/4.2j Faifley - Regeneration Areas 31-Mar-2023
Knowes HA continue to work to bring forward their new
build development at Faifley bowling club and we hope
that the Faifley school campus relocation will create
opportunities for affordable housing development.
Emily Dorrian
H&E/LHS/22-23/4.2k Clydebank East - Regeneration Areas 31-Mar-2023
The new development at Clydebank East has started
construction and will provide high quality energy efficient
new homes alongside quality amenity spaces.
Emily Dorrian
H&E/LHS/22-23/4.3a
Report on number of homes brought
back into use through Empty homes
strategy
31-Mar-2023 Complete Karen Rae
H&E/LHS/22-23/4.3b
Report on number of homes brought
back into use through buy back
policy
31-Mar-2023 We bought back 20 homes last year and have an ambition
to increase this number year on year.
Dawn Conner;
Emily Dorrian
H&E/LHS/22-23/4.4b
Review consultation information
relating to the New Deal for Tenants
Act
31-Mar-2023 Complete Karen Rae
5. Particular and Supported Housing
Page 95

Page 96

Action Code Action Status Progress Due Date Note Owner
H&E/LHS/22-23/5.4
Review modules on I-learn for
housing staff or develop specific
materials as required
31-Mar-2023 Resourcing has limited the scope to work on this action,
will take forward into 2023/24. Emily Dorrian
H&E/LHS/22-23/5.5
Housing and HSCP will meet 6
monthly  to discuss specific housing
challenges and opportunities
31-Mar-2023
Housing and HSCP have had a number of meetings but we
have not yet formalised the meetings into this structure
due to time and resource contrainsts.
Emily Dorrian
H&E/LHS/22-23/5.6a
Carry out engagement with residents
at Dennystoun Forge to establish
their needs and aspirations for the
site
31-Mar-2023 Not all surveys completed but engagement continuing
with discussion over possible establishment of a TRO. Jamie Dockery
H&E/LHS/22-23/5.6b Review the need for transit sites for
travelling communities 31-Mar-2023
Engagement has commenced between the Dennystoun
Forge community and WDC Planning over consultation on
the next LDP.  The issue of possible transit sites is one
that has been raised in informal discussions.
Jamie Dockery
Page 96

Page 97

Action Status
Cancelled
Overdue
Not on track
In Progress and on track
Completed
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Risk Status
Alert
High risk
Warning
OK
Unknown
Long Term Trends
Improving
No change
Declining
Short Term Trends
Improving
No change
Declining
Page 97

Page 98

Page 98

Page 99

West Dunbartonshire Council
Report by Chief Officer Housing and Employability 
Housing and Communities Committee:  22 November 2023
Subject:  West Dunbartonshire Strategic Housing Investment Plan 2024/25 –
2028/29 – More Homes West Dunbartonshire
1. Purpose
1.1 This report seeks approval for the More Homes West Dunbartonshire Strategic
Housing Investment Plan (SHIP) for 2024/25 – 2028/29 which requires to be
submitted to the Scottish Government.
2. Recommendation
2.1  It is recommended that the Council:
i) Agree the draft SHIP 2024/25 - 2028/29 as appended to this report,
designed to continue the delivery of an ambitious programme of new
affordable homes in compliance with the West Dunbartonshire Local
Housing Strategy 2022 -2027 (Approved November 2021)
ii) Delegate authority to the Chief Officer, Housing and Employability to
implement the investment plan in partnership with relevant stakeholders.
3. Background
3.1 The Scottish Government requires local authorities to submit a Strategic Housing
Investment Plan (SHIP) each year.  The core purpose of the SHIP is to set out
the strategic investment priorities for affordable housing over a five year period to
achieve the outcomes contained in the Local Housing Strategy.
3.2  The SHIP focuses on the delivery of affordable housing by location, type and
tenure and indicates how the programme will be resourced, particularly through
the Scottish Government’s Affordable Housing Supply Programme(AHSP)
funding and its Council House Building Programme component.
3.3  This new Strategic Housing Investment Plan (SHIP) sets out the funding
priorities for new affordable housing in West Dunbartonshire for the next five
years, 2024/25 – 2028/29   It complements the West Dunbartonshire Local
Housing Strategy 2022 - 2027 approved by Council and submitted to the Scottish
Government in November 2021.
ITEM 12
Page 99

Page 100

3.4   This SHIP sets out proposals for a continuation of the high levels of new
affordable housing delivery achieved in West Dunbartonshire over recent years.
It recognises that inflation is impacting on the costs of new build and this brings
additional programming difficulties and risks.    
3.5 To assist in advance planning of housing investment, the Scottish Government
advises local authorities annually of their minimum Resource Planning
Assumptions (RPA).  Our annual Resource Planning Assumption stands at
£10.795m plus an expected £3.0m of additional funds. This is a significant level
of support from the Scottish Government, providing a platform for a healthy new
build programme during the course of the SHIP. While this is very much to be
welcomed and highlights an ongoing confidence in West Dunbartonshire to
deliver against our clear targets, the programme is overwhelmingly Council
driven, and the delivery of our own programme will be key in securing the
additional funding.
3.6 The project grant levels have been estimated based on current guidance with an
estimated £110K per unit being projected for both Council and Housing
Association schemes.  There remains a discrepancy between Council and HA  
grant levels but it is anticipated that a higher proportion of larger family homes in
the Council programme will attract a higher level of grant to compensate.  The
Scottish Government have introduced particular quality measures which attract
higher grant rates and this is to be welcomed. 
3.7    The Scottish Government grant funding required to deliver the priority projects
listed in the programme amounts to around £62m   Further discussion will take
place with the Scottish Government’s More Homes Division over resourcing this
SHIP programme within the context of the approach to housing supply. 
4. Main Issues
4.1   The purpose of the SHIP is to set out the strategic investment priorities for new
affordable housing over a 5-year period to achieve the outcomes contained in the
LHS.   This SHIP sets out the planned housing investment programme for 5
years, covering the period 2024/25 – 2028/29.
4.2  The funding for the projects will be from two principal sources:
• the allocation from the  Scottish Government’s Affordable Housing Supply
Programme
• the remainder of the required funding will require to be found from the
developing organisations’ own borrowing resources.
4.3  The SHIP contains tables which detail the projects included in the proposed
programme.  It should be stressed that inclusion in the SHIP does not guarantee
Page 100

Page 101

scheme approval, as each proposal will require to go through a further detailed
assessment before funding is committed.
4.4  All homes built through the SHIP will require to meet high quality requirements
including the Council’s Design Standard for Affordable Housing, which was
updated in February 2019 and is currently being reviewed with a view to
introducing an updated version from financial year 2024/2025.   
4.5 SHIP 2024/25 – 2028/29 Priority Projects
The priority projects for this period including those currently on site, are as   
shown in table 3 below.  All units are social rented unless otherwise stated and
unit numbers are draft in some cases.
Table 3: SHIP 2024/5- 2028/9: Priority Projects by Developer*
Site/Developer Number of
West Dunbartonshire Council
Clydebank East 88
Pappert 26
Willox Park 17
Mount Pleasant, Old Kilpatrick 19
Clydebank Health Centre 38
Bank St, Alexandria 22
Bonhill Gap Sites 34
Gilmour Avenue  2
Acquisition Programme 300
546 units
Dunbritton Housing Association
19 Brown St, Haldane 1
Golfhill Drive, Dalmonach 7
8 units
Caledonia Housing Association
Bellsmyre Regeneration Phase 1&2 110
Dalquhurn, Renton  Phase 4, 5,6 75(25 Shared
Equity)
Bellsmyre Regeneration Phase 3 28
213  units
Knowes Housing Association
Abbeylands Road, Faifley 27
27 units
TOTAL PRIORITY PROJECTS 794
Page 101

Page 102

4.6  In total the SHIP shows the development of around 500 new build affordable
homes over the 5-year plan period. This level of development continues the
ambitious growth in the new affordable house building programme in West
Dunbartonshire. The delivery of this ambitious plan will depend upon the support
of our developing RSL partners and generous funding from the Scottish
Government.
4.7  The SHIP will also provide support funding from the AHSP to assist the
successful buyback programme of ex- local authority and RSL housing stock, as
well as acquisitions from the private sector including of-the-shelf homes from
house builders. It is proposed that 300 units are acquired by the Council over the
five years of the plan.
4.8  The funding required to deliver this programme is estimated to be around £62M. 
While this figure is within the estimated Resource Planning Target of around
£69m for the period, we are experiencing a period of building industry rising costs
where budgets may be stretched.  
4.9 Due to uncertainties over details of some of the proposed projects in the SHIP  
and the availability of funding, the SHIP will require to demonstrate flexibility and
will be subject to continual monitoring and evaluation.  The SHIP lists a series of
future projects which we hope will feature in the programme as it progresses.  
Monitoring of progress will be carried out through the Council’s performance
management system and through key structures such as the Housing Providers
Forum, Housing Performance Improvement Board and programme review
meetings with the Scottish Government.  
4.11 The Council has carried out an analysis of potential projects against an objective
Prioritisation Scoring Matrix and scored them accordingly.  A number of factors
are taken into account including availability of land, type of housing being
proposed, compliance with LHS objectives, deliverability and value for money. 
5. People Implications
5.1 While there are no direct people implications, the increase in the programme has
raised resourcing issues in both Housing Development and in Consultancy
Services but measures have been taken to address these issues. 
6. Financial Implications
6.1 There is a danger that future resource allocation could suffer if the SHIP fails to
deliver on the programme contained in this SHIP.   In respect of the Council
House Build element, financial modelling demonstrates that the new council
house building programme is beneficial to the HRA.  However, care requires to
be taken to ensure that the prudential borrowing required is financially
Page 102

Page 103

sustainable especially given rising unit costs.   To mitigate the impact of rising
costs, the Council is continuing to lobby for increased grant levels from the
Scottish Government and where appropriate apply for above benchmark awards
on a project-by-project basis.  In particular we recognise the high cost of
delivering large family homes and those constructed to passivhaus standard.   
7. Risk Analysis
7.1 Inevitably, with such a varied programme of projects there are risks that the
ambitious outputs set out in the SHIP will not be met.  A number of the projects
are at an early stage with site investigations not having been carried out or
infrastructural constraints fully known.
7.2  There is a risk that AHSP funding will be reallocated to other Council areas if the
Council is unable to spend within any financial year.  Housing Development staff
will liaise regularly with SG More Homes colleagues to address any concerns of
this nature, to maximise spend within West Dunbartonshire.
7.3 Monitoring of progress will be carried out through key structures such as the
Strategic Housing Providers Forum, the Housing Improvement Board, the More
Homes Delivery Group and programme review meetings with the Scottish
Government.   A new SHIP will be submitted annually to the Scottish
Government each October and will be the subject of a report to the Housing and
Communities Committee.
8. Equalities Impact Assessment (EIA)
8.1 An integrated impact assessment has been carried out which predicted that the
strategy would have an overwhelmingly positive impact.
8.2  All new housing supported through the programme will be compliant with the
West Dunbartonshire Design Standard and will meet the Housing for Varying
Needs requirements.  The West Dunbartonshire Design Standard requires
developers in the programme to provide higher standards than those required by
statute and are of particular benefit to those with mobility issues.  The SHIP
supports the delivery of specialist housing provision and generally allows for a
10% element in each project.
9. Consultation
9.1  The SHIP was drawn up in consultation with potential RSL partners and the
Scottish Government More Homes Division.    Where an interest has been
shown, detailed discussions have taken place with the prospective developer on
how the project could be accommodated in the programme.
Page 103

Page 104

9.2 The West Dunbartonshire Tenants and Residents Organisation received a
presentation on the proposed SHIP in October 2023. 
9.3 The preparation of the SHIP has been a corporate task, involving all relevant
departments of the Council and has been carried out in collaboration with
colleagues in the Scottish Government More Homes Division.
10. Strategic Assessment
10.1   This Strategic Housing Investment Plan presents the priorities for affordable and
deliverable housing development for the next five years as set out in the LHS and
support all the Council’s key strategic priorities.
Peter Barry, Chief Officer, Housing and Employability
Date:    8 November 2023
Person to Contact: John Kerr, Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability, 16 Church Street, Dumbarton 
john.kerr@west-dunbarton.gov.uk
Appendix:     Appendix 1:  Strategic Housing Investment Plan 
2024/25 - 2028/29
Background Papers: West Dunbartonshire Council’s Local Housing Strategy 2022-
2027
EIA Assessment, October 2023
Wards Affected: All Wards
Page 104

Page 105

West Dunbartonshire Council 
Strategic Housing Investment Plan
2024/25 – 2028/29
Draft October 2023
ITEM 12 - APPENDIX 1
Page 105

Page 106

TABLE OF CONTENTS
Table of Contents ..................................................................................................................................................................................................................... 2
1. Introduction. ........................................................................................................................................................................................... 3
2. Purpose of the Strategic Housing Investment Plan ................................................................................................................................ 6
3. Key Objectives ......................................................................................................................................................................................... 7
4. Policy ContexT ......................................................................................................................................................................................... 8
5. Local Housing Strategy 2022- 2027 ........................................................................................................................................................ 9
6. Project Assessment Methodology ........................................................................................................................................................ 12
7. Funding ................................................................................................................................................................................................. 13
8. Progress on Previous SHIP 2023/24 – 2027/28 .................................................................................................................................... 15
9. SHIP 2024/25 – 2028/29: Priority Projects ........................................................................................................................................... 19
10. Consultation .......................................................................................................................................................................................... 21
11. Infrastructure Fund ............................................................................................................................................................................... 22
12. Council Tax on Empty and Second Homes ............................................................................................................................................ 23
13. Developer Contributions ....................................................................................................................................................................... 23
14. Constraints ............................................................................................................................................................................................ 23
15. Local Authority Assistance in the Delivery of the SHIP ......................................................................................................................... 23
16. Delivery ................................................................................................................................................................................................. 25
17. Energy Efficiency, Environmental Standards and Sustainability ........................................................................................................... 25
18. Equalities Issues .................................................................................................................................................................................... 25
19. Strategic Environmental Assessment (SEA) .......................................................................................................................................... 26
20. Monitoring ............................................................................................................................................................................................ 26
21. Feedback ............................................................................................................................................................................................... 26
Page 106

Page 107

1. INTRODUCTION.
1.1 The Strategic Housing Investment Plan (SHIP) 2024/25 – 2028/29 sets out the funding priorities for affordable housing in West
Dunbartonshire for the next five years as outlined in the West Dunbartonshire More Homes Better Homes Local Housing Strategy 2022-2027.
The SHIP is an operational document rather than a strategic one. 
1.2 The SHIP is an annual document whose focus is to set out strategic housing investment priorities through the targeting of the Scottish
Government’s Affordable Housing Supply Programme Funding (AHSP), including its Council House Building Programme (CHB) component.
1.3 The SHIP details how West Dunbartonshire Council will assist in supporting the Scottish Government’s commitment to deliver new
affordable homes in Scotland in support of the Housing to 2024’s vision for everyone to have a safe, good quality and affordable home that
meets their needs in the place they want to be.  The Housing to 2040 Strategy includes a target to provide 110,000 affordable homes by 2032
with at least 70% of these homes to be developed for social rent.     This SHIP aims to deliver around 793 new social rented homes in West
Dunbartonshire during the period of the SHIP.     Among the housing-related commitments in its Programme for Government issued in September
2023, the Scottish Government’s reaffirmed the importance of achieving these targets.
1.4   The SHIP has been prepared using the latest appropriate guidance, namely:
• Strategic Housing Investment Plan (SHIP) guidance note MHDGN 2023/02
• Affordable Housing Supply Programme (AHSP): process and procedures MHDGN 2023/01
• MHDGN 2019/02 Guidance for Setting Local Housing Strategy Targets to Support the Delivery of More Wheelchair Accessible
Housing – March 2019.   Cognisance has also been taken of the consultation currently ongoing on Enhancing the accessibility,
adaptability and usability of Scotland’s homes.
1.5 Housing Services has worked with all appropriate Council service areas and consulted with the West Dunbartonshire HSCP in the
preparation of this Plan. Consultation has taken place with the RSLs operating in West Dunbartonshire through the Housing Providers Forum
Page 107

Page 108

and regular programme/liaison arrangements.  The Scottish Government More Homes Division Glasgow and Clyde Area Team have contributed
to the preparation of the SHIP. Further information on the consultation process is contained at Section 10 below.  The draft SHIP was the subject
of discussion at the West Dunbartonshire Tenants and Residents Organisation (WDTRO), the tenants’ umbrella forum, before seeking Committee
approval.    
1.6   The Scottish Government issued new SHIP Guidance (MHDGN 2023/02) in June 2023.  The main changes to the guidance were as follows:-
• an uprated set of affordable housing investment benchmarks is reflected in this guidance note, alongside illustrative examples showing
how these work in practice – these benchmarks are 16.9% higher than the previous set (this percentage increase reflects the Scottish
Social Housing Tender Price Index for the year to December 2022)
• homes within new build and conversion projects receiving AHSP grant funding will require to contain zero direct emissions heating    
systems
• an additional 'quality measure’ benchmark for the installation of electric vehicle charge points has been introduced
• the quality standards that would require to be met when purchasing ‘second-hand’ residential dwellings with vacant possession have
been included
• RSL social rent benchmark assumptions are reintroduced for grant assessment purposes, and
• Information is provided on the Scottish Government’s Heat Network Fund.
It continues to emphasise links to the Child Poverty (Scotland) Act 2017 and Gypsy/Travellers accommodation, Wheelchair Accessible Housing
and support for Rapid Rehousing Transition Plans.  
1.7 To assist in advance planning of housing investment, the Scottish Government advises local authorities annually of their minimum
Resource Planning Assumptions (RPA). 2022/23’s Resource Planning Assumptions (RPA) outturned at £2.8m behind target, this was a
disappointing performance and signalled the first year since 2011/12 where outturn was less than the allocation.  More positively, the Scottish
Government have reviewed our 2023/24 development programme with ourselves and are proposing, subject to Ministerial approval, to increase
our RPA by circa £3m from the current £10.795m.  While this is very much to be welcomed and highlights an ongoing confidence in West
Dunbartonshire to deliver against our clear targets.  The programme is overwhelmingly Council driven, and the delivery of our own programme
Page 108

Page 109

will be key in ensuring the additional funding and continued confidence in the Council’s deliverability.  If repeated every year, this would give a
projected grant receipt for the period of the SHIP to 2028/29 of around £69m in total.   As noted above, a 16.9% grant benchmark increase is
now in play and, while welcome, will impact on the overall numbers able to be delivered by the RPA.    
1.8 The high ambitions contained in this SHIP can only be delivered with adequate financial support from the Scottish Government’s AHSP,
not least in respect of the Council’s own new build programme.  While some progress has been made to address the historic disparity between
Council and RSL grant rates, the playing field is not yet level, with RSL grants being more generous than those for Councils. Despite the grant
uplift and the prospect of benchmark flexibility, the huge increase in build costs will make it challenging to accommodate the proposed
programme in the HRA Capital budget.   
1.9 It is clear that the need for affordable homes has and will increase in the current ongoing economic environment. Our More Homes West
Dunbartonshire approach is an ambitious plan that aims to continue the positive momentum of the delivery of much needed Council homes in
West Dunbartonshire and will significantly assist the Council’s aim to deliver 2500 new social and affordable homes by 2032.
1.10    There are several areas emphasised in Housing to 2040 which influence the SHIP, in particular:
•  Housing to 2040: vision & route map 
•  Funding for new build homes 
•  Design of new homes 
•  Referencing the energy efficient Scotland route map 
•  Investing in renewable energy infrastructure 
•  Focus on creating 20 minute neighbourhoods 
•  Supporting people with housing costs & stopping homelessness 
•  Equalities and inclusion 
•  Affordability and accessibility 
•  Digital access.
1.13 As always, the funding shown for projects is an indication only of the spending plans and does not guarantee that these sums will be
made available.  Each proposal will require going through a further detailed assessment before funding is committed to ensure that the project
complies with requirements and to ensure that funding is available.   
1.14 Following submission of the SHIP, the Scottish Government will issue a Strategic Local Programme Agreement to West Dunbartonshire
Council (SLPA) confirming the AHSP funding.  
Page 109

Page 110

2. PURPOSE OF THE STRATEGIC HOUSING INVESTMENT PLAN
2.1 The principal purpose of the SHIP is to set out the strategic investment priorities for affordable housing over a 5-year period to achieve
the outcomes set out in the LHS.   This SHIP sets out the planned housing investment programme for 5 years, covering the period 2024/25 –
2028/29.
2.3 Key investment priorities on a site by site basis are set out
in the templates attached to this plan.  The templates give
information on the following:
• The priorities for new affordable housing projects
• Estimated start and completion dates
• Projected funding sources
• The number of units to be provided (by tenure and
type)
• Funding requirements of Committed Projects
2.2   The SHIP:
• Sets out investment priorities for affordable
housing
• Demonstrates how these will be delivered
• Identifies the resources required to deliver these
priorities
• Enables the involvement of key partners in the
delivery of affordable housing.
Page 110

Page 111

3. KEY OBJECTIVES
3.1 The overarching objective of the SHIP is to help deliver the Council’s key housing priorities as contained in its Local Housing Strategy 2022 -
2027, in particular by directing investment to the agreed regeneration areas and on increasing the supply of new affordable housing across West
Dunbartonshire. The LHS sets an annual Housing Supply Target of 230 new houses across all tenures, with 80 of these being for Social Rent.  
3.2 The Council notes the Scottish Government’s ongoing support for new affordable housing and the target contained in Housing to 2040 to
provide 110,000 affordable homes by 2032 with at least 70% of these homes to be developed for social rent.  Under its More Home West
Dunbartonshire initiative, the Council has made and will continue to make a significant contribution to this goal, subject to ongoing Scottish
Government support funding.
Page 111

Page 112

4. POLICY CONTEXT
4.1 The Scottish Government’s Housing to 2040 consultation
provides the backdrop to housing policy in the period of this SHIP and
beyond. The vision setting document for Housing to 2040 identifies
challenges relating to the ageing population, changing household
structures, climate change, homelessness, child poverty and wider welfare
reforms, which will all impact on housing.  
4.2 The LHS 2022-2027 and its annual updates provide the principal
West Dunbartonshire Council policy context to the SHIP.
4.3 All Scottish Local Authorities have in place a Rapid Rehousing
Transition Plan (RRTP) setting out their approach to minimising the time a
household remains homeless and ensuring they can access appropriate
housing as quickly as possible.  To help the delivery of the WDC RRTP, the
Council has agreed to allocate one property in each of its new CHB projects
for RRTP purposes. In response to the ongoing homelessness crisis, we are
engaging with our SHIP developing partners with a view to them taking a
similar approach.
Page 112

Page 113

5. LOCAL HOUSING STRATEGY 2022- 2027
5.1 The Local Housing Strategy 2022-2027 continues to place an
emphasis on regeneration, acknowledging the need to improve many
of our neighbourhoods and to provide housing that meets the
changing requirements of our communities.  In terms of the types of
housing which is required, we recognise that physical access to too
many of our houses is an issue.  We will therefore encourage the
provision of more accessible housing and ones that are suitable for
wheelchair users. Similarly, we know that there is a size imbalance
between the available housing and the demand, with particular
shortages of 1-bedroom properties and, especially larger family
houses.   Developers seeking to access AHSP funding must consult with
WDC Housing Development team on how best to contribute to
addressing these imbalances and on meeting the objectives of the LHS.
5.2   As well as supporting wider regeneration objectives, where the
opportunity arises, the SHIP will seek to assist in reviving our town
centres.   There is a growing recognition that housing can play an
important role in bringing life back to our high streets.  We will
consider acquiring vacant commercial units with a view to conversion
to housing.    
5.3   In addition to the regeneration agenda, the Council is keen to
encourage an increase in the housing supply more generally across
West Dunbartonshire to mitigate an ageing demographic and to
stimulate the local economy. Increasing the supply will also more
support to be given to the Ukrainian and Afghan Resettlement
Programmes. 
5.4    The Council, as Strategic Housing Authority, has the statutory
lead role in setting out the investment priorities for the delivery of
affordable housing.  Through the “More Homes West Dunbartonshire”
approach, we are working with our strategic development partners to
take forward opportunities to provide a broad range of high quality
affordable homes in safe and attractive neighbourhoods that meet the
needs of our residents.  We were somewhat disappointed that only a
small number of RSLs have brought forward projects for funding
through this SHIP. This may be indicative of a shortage of appropriate
sites.  We will continue to work with Planning and Estates colleagues,
and with the private sector, to identify a healthy supply of
development sites and continue to encourage proposals from RSLs for
future inclusion should resources allow.
5.5   There is a shared recognition that the Housing Sector – through
the  leadership of the Council – and the West Dunbartonshire Health
and Social Care Partnership (HSCP) must work together closely in
supporting the delivery of the health and social care integration
Page 113

Page 114

agenda.  We are conscious that our understanding of the nature and
extent of the need for specialist housing requires to be improved. We
are working with the HSCP to get a clearer picture of the level of need
and predicted demand for the next five years.  The Local Housing
Strategy notes that successful housing and social care support
depends on the location, model and range of housing available.  A
Housing Contribution Statement forms part of the HSCP Strategic Plan
outlining our joint objectives. Recent research indicates that four-
fifths of LA projects featured some degree of specialist provision,
compared to just over a half of RSL projects.  We encourage Housing
Associations to bring forward projects that support the provision of
much needed specialist housing.
5.6    Given the local demographic, the prevalent topography and
the nature of our housing stock, accessibility to housing for people
with a mobility issue is a big concern in West Dunbartonshire.   We
continue to encourage developers to prioritise developments that
meet the needs of people with mobility issues and our Housing Design
Standard sets out our requirements.
5.7   While all new housing supported by the AHSP is required to satisfy
Housing for Varying Needs (HfVN) criteria, the West Dunbartonshire
Design Standard ensures an even higher quality standard.  The Scottish
Government is consulting over proposed changes to the HfVN that has
been in place for 25 years. A number of the proposals already form
part of our Design Standard and we would welcome this updating,
although it is unlikely to become effective until 2025/2026.  
5.8     We also aim to continue to improve the supply of housing
suitable for wheelchair users.  In some circumstances the provision of
lifts may present a solution to accessibility issues.   The West
Dunbartonshire Design Standard: 2019 requires that all SHIP projects
provide a minimum 10% proportion of wheelchair accessible homes
(see 17.2 below).  This requirement may only be relaxed in exceptional
circumstances where, for example, the project is being developed for
different specialist housing purposes or where the topography is
particularly difficult.  Where no specific specialist housing provision is
stipulated in the project, it will generally be assumed that around 10%
on each site will be for this purpose, with the detail being agreed at a
later date in consultation with HSCP colleagues.  The Design Standard
is under review with a revised version scheduled to be in place for
projects commencing after 1st April 2024.  
5.9   Research has found that the rate of child poverty in Scotland is
lower than in the rest of the UK because of a higher prevalence of
social housing.  The SHIP supports the housing related actions
contained in the Local Child Poverty Action Report 'Improved Life
Chances for all Children, Young People and Families’.  In particular, the
SHIP supports     those actions in the report around the delivery of new
affordable housing through the More Homes better Homes West
Page 114

Page 115

Dunbartonshire approach (H&E/1819/HD&H/002), developing
community benefits including job opportunities (RES/1718/PR/001)
and reducing the cost of living through better energy efficiency
(H&E/1920/W4U/12).  Working 4U are represented on the More
Homes Delivery Group where they help shape the development of the
programme.   To address the historic shortage in homes four and more
bedrooms, we are encouraging developers to provide larger family
homes in their projects and have adjusted our scoring matrix
accordingly.  If this continues to be an area of demand concern, we
will consider introducing a target quota for larger homes. 
5.10    The Council is currently engaged with the residents of our
Gypsy/Travellers site over much needed improvements.  We are in
discussion with the Scottish Government over accessing their Gypsy
Traveller Accommodation Fund but if this fails, we will give
consideration to the option of accessing the AHSP fund.  Accordingly,
the Dennystoun Forge site is included in the SHIP as a possible future
project of 20 homes.
5.11    While there is limited evidence of significant demand for
intermediate/mid-market rent products (MMR) in West
Dunbartonshire, some housing providers retain an interest in looking
at such products and this SHIP contains a small number of shared
equity projects.  The Council too is considering providing some shared
equity tenure homes as part of our Council house new build
programme.
Page 115

Page 116

6. PROJECT ASSESSMENT METHODOLOGY
6.1 Projects considered for inclusion in the SHIP are subject to a matrix based scoring analysis to assess their relative merits.   Various
criteria are employed in assessing and prioritising the projects:
6.2  There are information gaps in respect of some mooted projects: these have been listed on the scoring pro-forma as “shadow” or
reserve projects and these will be subject to reassessment when the full information is available.  These projects may feature in future versions
of the SHIP. 
• The strategic priorities of the Council including contributing to Covid-19 recovery plans
• Contribution towards meeting the assessed housing need and demand and especially supply of
larger family homes
• Meeting regeneration /Planning objectives including support for 20 minute neighbourhood
principles
• Degree of Low carbon/energy efficiency
• SIMD Scoring
• Affordability
• Deliverability including site constraints
•
Page 116

Page 117

7. FUNDING
7.1    Funding for the projects in this programme comes from two
principal sources:
• the allocation from the Affordable Housing Supply
Programme as noted at 1.6 above and
• funding from the housing providers’ sources, primarily
private borrowing by RSLs and Prudential borrowing by the
Council.
7.2 As noted above, our annual Resource Planning Assumption
stands at £10.795m plus an expected £3.0m of additional funds. This
is a significant level of support from the Scottish Government,
providing a platform for a healthy new build programme during the
course of the SHIP. While this is very much to be welcomed and
highlights an ongoing confidence in West Dunbartonshire to deliver
against our clear targets, the programme is overwhelmingly Council
driven, and the delivery of our own programme will be key in
securing the additional funding. 
7.3 The RPA announcement was made prior to the discussions
around the National Acquisition Scheme that may release further
funds, or at least increase the grant subsidy available for larger
family homes in support of our buyback programme. The More
Homes Board will carry out ongoing monitoring of the programme’s
progress to ensure its delivery and to maximise approved RPA spend.
The Council will recruit a Senior Housing Development Officer to lead
on delivering our local scheme that would see a minimum of 300 new
social homes in West Dunbartonshire over the next 5 years and
would be the dedicated contact point within the local authority
which the national scheme demands.
7.4   New revised AHSP grant benchmark levels were published in
June 2023; these reflect a 16.9% uplift based on the Scottish Social
Housing Price Index.  While this cost uplift is very welcome, the rising
cost of new build places them on the edge of viability.
7.5     For the costing of this SHIP, unless otherwise known, it has
been assumed that both Council and RSLs projects will be seeking an
average grant figure of £110,000.  While the new RSL current
benchmark support figure is £102,054 per unit (3-person equivalent
plus additional quality measures) and the Council equivalent is
£94,456,  we expect a number of the proposed projects will be above
benchmark, and for the Council projects in particular, will contain a
higher than average number of larger sized units. 
7.6     A recent study has found that the average gross new build
affordable housing cost per unit was around £166,000, ranging
from £107,250 to £296,000. We anticipate that a large number of
projects will require to seek above benchmark grant funding from
the Scottish Government.  Our estimate of £110K per unit may be
Page 117

Page 118

an underestimate and this is an issue we plan to discuss with the
Scottish Government.   
7.7  Where a Council House Building project is proposed on a
Housing Revenue Account site, it is assumed that there will be no
acquisition costs to the project.
7.8  In collaboration with the Scottish Government More Homes
Division, and representative bodies such as ALACHO, the Council will
continue to consider alternative and innovative funding proposals
for the delivery of affordable housing.    In addition, we will seek to
explore with partner RSLs any opportunities to support the
programme with funding from their financial reserves or other
sources.
7.9  West Dunbartonshire Council is a partner organisation in the
Scotland Excel framework and while we anticipate that this will
continue to be a principal procurement delivery vehicle for new SHIP
projects.  In consultation with our Procurement colleagues, we are
engaging with other appropriate frameworks. 
Page 118

Page 119

8. PROGRESS ON PREVIOUS SHIP 2023/24 – 2027/28
8.1 The progress on the SHIP 2023/24 - 2027/28 priority projects is summarised in table 2 below:
Table 2: Progress on Previous SHIP 2023/24 – 2027/28
Projects Completed 2023/24
Project Units Status Developer
140 Dumbarton Road, Old
Kilpatrick 48
Site start Jan 2021 with
completion delayed until
September 2023
Link HA
Projects Currently On-Site/Due on Site   2024/25
Project Units Status Developer
Clydebank East 88 Site Start Jan 2023
Est Completion Spring 2025 WDC
Pappert, Alexandria 26 Est Site Start Jan 2024
Est Completion Winter 25 WDC
Willox Park 17 Est Site Start Winter 2023/24
Est Completion Winter 2024/25 WDC
Mount Pleasant, Old Kilpatrick 19 Est Site Start March 2024
Est Completion Spring 25 WDC
Page 119

Page 120

Bank St, Alexandria 22 Est Site Start Winter 2023/24
Est Completion Winter 2024/25 WDC
Clydebank Health Centre 38 Est Site start July 2024
Est Completion December 2025 WDC
Abbeylands Road, Faifley
(Bowling Club) 27 Est Site Start Spring 2024
Est Completion Summer 2025 Knowes HA
Bellsmyre Regeneration Phase 1 60 Est Site Start November 2023
Est Completion February 2025 Caledonia HA
Bellsmyre Regeneration Phase 2 50 Est Site Start February 2024
Est Completion February 2025 Caledonia HA
Dalquhurn Phase 4 25 Est Site Start November 2023
Est Completion November 2024 Caledonia HA
Golfhill Drive, Alexandria 7 Est Site Start Spring 2024
Est Completion Spring 2025 Dunbritton HA
Bonhill Gap Sites 34 Est Site Start Spring 2024
Est Completion Summer 2025 WDC
Bellsmyre Regeneration Phase 3 28 Est Site Start August 2024
Est Completion November 2025 Caledonia HA
Dalquhurn Phase  5 & 6 25SR/25SE Est site Start 2024
Est Completion September 2025 Caledonia HA
Gilmour Avenue 2 Est Site Start Spring 2024
Est Completion Autumn 2025 WDC
Brown Ave, Haldane 1 Est Site Start Spring  2024
Est Completion Summer 2024 Dunbritton HA
Buybacks 300 WDC
Page 120

Page 121

Future Sites Identified in SHIP
Project Comments
Artizan Centre,  Dumbarton Town
Centre
WDC hope to provide some housing as part of a wider town centre regeneration project, initially a
42 home Later Living development.   There is a possibility that other affordable housing
opportunities will become available in later phases.
Boquhanran Road, Dalmuir Clydebank HA is in early stage discussions to build up to 90 units here.
28 Bridge St, Alexandria WDC looking to convert/ or build anew the old hostel unit previously operated by Preparation for
life.
Cottage Hospital, Dumbarton Dunbritton Housing Association are currently looking at the possibility of developing 10 units of
social housing on the site. 
Dennystoun Forge WDC propose to develop 20 homes at the Gypsy Traveller site through the SHIP if alternative
Scottish Government funding is not available.
Dumbain Road, Haldane Wheatley group are looking at this site which sits within the LL&T National Park. 
MBQ Blocks, Mountblow The Council is in the process of the demolishing these three multis and plans to provide new
homes in their place. 
Mitchell Way The Council and some RSL developers have expressed an interest providing the housing element
of the Alexandria Town Centre regeneration.    
Ottowa Crescent, Dalmuir Dalmuir Park HA are in discussion with a developer over a 20 unit development on the site of a
former care home.
Queens Quay Site 3 WDC propose up to 100 units on this site but will depend on the success of a Derelict Land Fund
application and the acquisition of additional land.   Viability to be assessed early 2024.
Queen Mary Avenue, Drumry WDC looking to develop around 16 homes on the site of a former hall.
Page 121

Page 122

Skypoint, Faifley There is development interest should social housing form part of the school reprovisioning
project.
Smollett/ Dumbuie WDC wish to build replacement homes where defective ones were demolished.
Stanford St, Clydebank Clydebank HA is in discussions to build up to 88 units here.
Willox Park Ph 2 WDC looking at a second, complementary phase of the older people project.
Page 122

Page 123

9. SHIP 2024/25 – 2028/29: PRIORITY PROJECTS
9.1  Table 1 of the SHIP Templates at Annexe A, Affordable
Housing Supply Programme: Years 2024/25 -2028/29, details the
projects contained in this SHIP.   The priority projects for this period,
including those currently on site, are as shown in table 3 below.  All
units are social rented unless otherwise stated and unit numbers are
draft in many cases.
Table 3: SHIP 2024 - 2029: Priority Projects by Developer*
Site/Developer Number of Units
West Dunbartonshire Council
Clydebank East (ex MSF site) 88
Pappert 26
Bank St 22
Mount Pleasant 19
Willox Park 17
Clydebank Health Centre 38
Bonhill Gap Sites 34
Gilmour Avenue 2
Units  246
Knowes Housing Association
Abbeylands Road, Faifley
(ex bowling club) 27
Units  27
Dunbritton Housing Association
19 Brown St, Haldane 1
Golfhill Drive, Dalmonach 7
Units  8
Caledonia Housing Association
Bellsmyre Regeneration Phase 1&2 110
Dalquhurn, Renton  Phase 4, 5,6 75 (inc 25SE)
Bellsmyre Regeneration Phase 3 28
Units  213
TOTAL PRIORITY PROJECTS  494
Page 123

Page 124

* All homes are social rented unless otherwise stated and it
includes projects currently on site.  During the period of the SHIP, a
further 300 buyback/ROTS are planned to add to this total.
9.2 WDC operates a very popular “Buy Back” scheme whereby
the Council can re-purchase vacant Right to Buy and other houses
which are on the market, to help meet strategic housing objectives,
including regeneration projects.  The scheme has grown significantly
in recent years with support from the AHSP.  Due to high demand,
West Dunbartonshire Council committed to scaling up our own
Acquisition/Buyback scheme and has committed £20m from the HRA
over the next 5 years to acquiring new homes to meet need.  The
buyback scheme provides support to the Rapid Rehousing Transition
Plan and other strategic priorities.  Criteria apply to the buyback
programme to ensure that the properties being considered will help
address housing need.  For example, in response to the identified
high demand, we place an emphasis on acquiring larger family
homes in this and in any West Dunbartonshire ROTS schemes.  The
Scottish Government have indicated that they will be willing to
support larger family home acquisitions with above benchmark grant
awards where appropriate.   
Currently we are estimating that 300 units will be acquired by the
Council through this route as well a further 20 by RSLs via ROTS.  
9.3  Excluding the reserve projects, the SHIP shows the provision
of almost 800 affordable rented homes over the 5-year plan period.
The delivery of this ambitious plan will depend upon the ongoing
support of our developing RSL partners and, in particular,
appropriate funding from the Scottish Government.  
9.4  The grant funding required to deliver the priority programme
we estimate to be around £62.6m.  While this figure is within the
estimated Resource Planning Target of £69m for the period, we are
likely to be entering a period of rising costs and potentially one
where specifications are improved in response to climate change
and Covid-19 response issues.   A particular concern is the indication
that the cost of providing Passivhaus standard is increasing
significantly.   The estimate cost does not include future projects
which have not yet been appraised but many of which will are likely
to feature later in the plan period.  
9.5   While almost all projects contained in this SHIP are for social
rent, alternative tenure in the form of shared equity units are
proposed by Caledonia HA.  Further investigation of the market for
alternative tenures requires to has been carried out which suggest
there may be an interest in certain areas of West Dunbartonshire. 
9.6 Due to continuing uncertainties over details of some of the
proposed projects in the SHIP and the availability of funding, the
SHIP will require to show flexibility and be subject to continual
monitoring.  The annual cycle allows frequent monitoring which will
be carried out through the Council’s performance management
system and through key structures such as the More Homes Board,
Page 124

Page 125

the Strategic Housing Providers Forum, Housing Improvement Board
and programme review meetings with the Scottish Government.  
9.7    The Council has carried out an analysis of potential projects
against an objective Prioritisation Scoring Matrix and assessed them
accordingly.    A number of factors are taken into account including
availability of land, type of housing being proposed, compliance with
LHS objectives, deliverability and value for money.  The scoring
mechanism will be kept under review in light of the national
response to the Covid-19 crisis. This analysis has informed this SHIP
and is attached as Annex B.
9.8    The SHIP scoring matrix contains a longer list of projects
which have been brought forward for consideration. These are
considered to be reserve projects. If there is slippage, or if additional
funding becomes available, some of these projects may be
introduced into the programme.  We will remain open to
consideration of other projects which may be presented during the
course of this plan period, indeed these would be welcomed, though
bearing in mind that resources are likely to be more limited during
this period.
10. CONSULTATION
10.1  This SHIP has been prepared in consultation with all RSLs
operating in West Dunbartonshire who were approached with a
“call for sites” for consideration for inclusion in the programme.
10.2  The SHIP was the subject of discussion at the Strategic
Housing Providers Forum and subsequent individual discussions
took place with potential developing associations.
10.3  The Scottish Government’s More Homes Division, Glasgow
and Clyde Team were consulted throughout in the preparation of
this SHIP. 
10.4 A consultation with West Dunbartonshire Tenants and
Residents Organisation took place on 26th October 2023 before
presentation to Housing Committee on 22 November 2023.
Page 125

Page 126

11. INFRASTRUCTURE FUND
11.1  The Infrastructure Fund provides grants for local authorities
and RSLs as well as loans to the private sector to help in the delivery
sites for new affordable housing. 
11.2  The Council has so far been unsuccessful in accessing this
fund but will engage further with colleagues in the SG More Homes
Division to look at possibilities for grant assistance to ease some of
the infrastructural constraints likely to affect projects in the future
programme. 
Page 126

Page 127

12. COUNCIL TAX ON EMPTY AND SECOND
HOMES
12.1 In West Dunbartonshire funding raised from reducing empty
and second hand homes is used to support our Homes Again West
(Empty Homes) approach which has led to 164 homes in the local
authority area being brought back into use.  
13. DEVELOPER CONTRIBUTIONS
13.1  At present there is no Affordable Housing Policy in West
Dunbartonshire, and therefore no developer contributions
providing support to the programme in West Dunbartonshire.  The
introduction of NPF4 may signal a change in how housing site
allocations are made by tenure in West Dunbartonshire.  Further
discussions will take place with our Planning colleagues in the
preparation of hr next Local Development Plan.
14. CONSTRAINTS
14.1  Scottish Government guidance indicates that SHIPs should
have an emphasis on deliverability.   In preparing the SHIP, every
effort has been made to take account of any constraints that may
affect the delivery of the projects and this is taken account of in the
assessment scoring.   There is recognition that many of the larger
and easier sites, including a number of the ex-school sites,  have
been developed in previous years and the programme outlined in
this Plan may be more problematic to achieve.  The SHIP will
require to demonstrate flexibility in programming of its projects.
14.2   A number of the projects contained in this SHIP are at the
early stage of their development and the full issues/constraints are
not known at this stage.  For example, a number of the projects
contained within the SHIP are not at the stage of having the
necessary Planning or consents or Building Warrants.
15. LOCAL AUTHORITY ASSISTANCE IN THE
DELIVERY OF THE SHIP
15.1  The Council is committed to assist where possible in the
delivery of the SHIP projects within the context of the More Homes
West Dunbartonshire initiative as outlined in the Local Housing
Strategy.  
15.2  Within the Council, the officers’ More Homes Board
monitors the delivery of the new council home element of the
programme and will continue to seek to identify additional sites to
extend the Council’s new build programme, supported by
prudential borrowing, the AHSP and the Council’s rent pooling
strengths.  The Council’s element of the programme will in the main
be carried out in-house by our Housing Development, with the
Page 127

Page 128

assistance of Consultancy Services and other Council service areas,
demonstrating efficiency and best value in the process, however
other routes to delivery, such as off-the- shelf and design and build,
will continue to be employed if better delivery efficiency can be
demonstrated. 
15.3  Land has previously been made available by the Council at
below market value to facilitate the development of affordable
housing to meet identified needs.  However, there is a need to
balance this against the Housing Revenue Account’s (HRA) interests
and the very significant pressures facing Council budgets.   In
addition, the Council is mindful of the need to balance the provision
of private sector and affordable housing sites to meet our Housing
Supply Targets.  
15.4  Vacant sites in the Housing Revenue Account, or areas of
surplus stock, have generally been made available to support the
development of social rented housing where appropriate.   The
costs of acquiring all sites will be reviewed on a case by case basis
and the Council as a developing organisation and our partner
housing associations will be expected to review their ability to make
full use of existing assets and borrowing capacity.    
15.5  Housing will continue work closely with Planning colleagues
to ensure an adequate supply of development land to meet the
increased targets within the context of the Local Development Plan.
As noted above, in light of the introduction of NPF4 further
consideration will be given to how housing sites are allocated by
tenure through the Planning process.   
15.6  Throughout the lifetime of this new Strategic Housing
Investment Plan, the Council will continue to explore options
around innovative delivery mechanisms to expand the supply of
affordable housing. 
Page 128

Page 129

16. DELIVERY
16.1  In terms of the procurement arrangement noted above,
there may be an opportunity in the future to widen the scope to
include other partner developers in the programme.  In addition,
scoping will continue of other new frameworks as they become
available to ensure the delivery of the programme and of best value. 
17. ENERGY EFFICIENCY, ENVIRONMENTAL
STANDARDS AND SUSTAINABILITY
17.1  Local Authorities are among a wide range of public bodies
required to meet the duties place on them by the Climate Change
(Scotland) Act 2009.    In this context, developments arising from the
SHIP must take account of the change agenda.  New Build
developments must contribute to the Single Outcome Agreement
local outcome commitment to reduce fuel poverty.
17.2  In tandem with this new SHIP, the Council is introducing a
revised and updated version of its pioneering higher standard for all
Council and Housing Association homes being built in West
Dunbartonshire, the West Dunbartonshire Design Standard. 
The Standard applies to all new build projects being supported by
the Affordable Housing Supply Programme in the SHIP programme
and requires these homes to meet a higher standard than the
statutory minimum.  It is proposed that new homes constructed
under this scheme will achieve Net Zero or Passivhaus standard and
Energy Efficiency Rating of B.   As well as improving energy efficiency,
the policy encourages better accessibility, external design and
internal space standards. 
17.3 As well as using the more commonly employed air source
heating pumps (ASHP) we are investigating the use of ground source
heating systems (GSH) which, while currently more expensive to
install, may prove to be more efficient and easier to maintain in the
longer term.  Efficiencies may be achieved by grouping these heating
systems to serve a housing project and this is an area for possible
development. 
17.3     The Council continues to encourage the consideration of
district heating systems or other innovative measures that
contribute to meeting climate change objectives.  The innovative
district heating scheme at Queens Quay, Clydebank is available for
roll out to nearby housing projects. 
18. EQUALITIES ISSUES
18.1  West Dunbartonshire Council is committed to delivering
good quality services which are underpinned by a clear
understanding of Equality and Diversity and to promoting and
sustaining equality and inclusion, and equality and diversity
principles. 
Page 129

Page 130

18.2  An integrated impact assessment was carried out on which
predicted that the strategy would have an overwhelmingly positive
impact.  
19. STRATEGIC ENVIRONMENTAL
ASSESSMENT (SEA)
19.1    A Strategic Environmental Assessment (SEA) pre-screening
report has been carried out in respect of the parent Local Housing
Strategy.  The Council has determined that a SEA is not required in
this instance.   
20. MONITORING
20.1 Monitoring of progress will be carried out through the Council’s
performance management system and through key structures such
as the Strategic Housing Providers Forum, the Housing Improvement
Board, the More Homes Delivery Group and programme review
meetings with the Scottish Government.  A new SHIP will be
submitted annually to the Scottish Government each October
following approval by the Housing and Communities Committee.
21. FEEDBACK
For more information, or if you want this information in a different
format or language, please use the contact details below:
Housing Development Team
Housing Development and Homelessness
Housing and Employability
West Dunbartonshire Council
John Kerr    Housing Development and Homelessness Manager
Phone: (01389) 737889
Email: John .Kerr@west-dunbarton.gov.uk
Jamie Dockery    Senior Housing Development Officer
Email: Jamie.Dockery@west-dunbarton.gov.uk
Jackie McRory    Senior Housing Development Officer
Email: Jackie.McRory@west-dunbarton.gov.uk
Mikayla Deeley   Senior Housing Development Officer
Email: Mikayla.Deeley@west-dunbarton.gov.uk
Page 130

Page 131

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 22 November 2023 
__________________________________________________________________
Subject: Review of West Dunbartonshire Affordable Housing Design
Standard 
1. Purpose
1.1 The purpose of this report is to seek approval for a revision to the current
West Dunbartonshire Design Standard for Housing Supported by the
Affordable Housing Supply Programme which has been in place since April
2019, to further improve the quality of new affordable homes being built in
West Dunbartonshire.
.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the content of this report outlining the progress in developing the
revised Design Standard
(ii) Agree in principle the revised West Dunbartonshire Design Standard 2023
as appended to this report
(iii) Agree that the new Standard be applied to any new projects receiving
funding approval from the Affordable Housing Supply Programme from 1st
April 2024
(iv) Delegate authority to the More Homes Board to consider any proposed
variations to the Design Standard.
3. Background
3.1  In November 2015, West Dunbartonshire Council introduced an innovative
Design Standard for Housing Supported by the Affordable Housing Supply
Programme (AHSP).  It required new homes to meet higher standards than
are statutorily required, notably in respect of floor space, home accessibility
and energy efficiency.  The Standard applied both to Council and Housing
Association new build homes.
3.2 In February 2019 Housing and Communities Committee approved a revised
and updated standard which was duly introduced in April 2019.
3.3 The West Dunbartonshire Council More Homes Better Homes Local Housing
Strategy 2022 - 2027 committed to a regular review of the Design Standard
ITEM 13
Page 131

Page 132

with a view to keeping it up to date with housing best practice and
developments in materials and technology.   
4. Main Issues
4.1   The purpose of the Design Standard is to ensure that the social homes being
developed in West Dunbartonshire with the support of the Scottish
Government’s Affordable Housing Supply Programme (AHSP) funding is of
the highest quality and incorporates best practice design, enabling those who
live in them to enjoy a high quality home environment regardless of age,
ability or health.  The last review of the standard took place in 2019 and it was
considered timely to carry out a review.
4.2 The principal changes proposed by the new standard are as follows:
• A better match of housing mix with identified housing need.  In particular,
we need to address the shortfall in larger family homes of four and over
bedrooms and developers are encouraged to contribute on this issue.
• All new homes to be net-zero/zero-carbon or passivhaus standard.
Currently, the Standard stipulates silver-plus level.  We await guidance
from the Scottish Government on what energy efficiency standard will be
required of new homes supported by the AHSP and we may wish to
review this element when the details are known.
• We wish to look more closely at measures which can be taken to future
proof our new homes for example on how best to enable the provision of
bathroom/shower facilities to improve accessibility as the tenant’s needs
change.
• There is an increasing awareness of the health harms that can be caused
by dampness and condensation in homes. Environmental sensors have
relatively recently been developed which can track temperature, humidity
and Co2 in the home.  We propose to make these compulsory elements of
new build projects.
4.3   The full version of the proposed new Design Standard is contained in
Appendix 1 of this report.
4.4 When we first introduced our Design Standard, we carried out extensive
research and consultations that demonstrated wide support for the measure.
The new refreshed standard was the subject of a consultation exercise as
detailed below at Section 9.    
4.5   The proposed new standard follows the format of the current version by listing
items which are considered essential and others which are seen to be
desirable.  We are asking developers to consider the desirable items whilst
recognising that these may be of an aspirational nature at this stage. 
4.6   The Scottish Government is consulting on improving guidance and standards
on the accessibility of homes. Essentially this is a review of the Housing for
Varying Needs (HfVN) design guide, last published in 1998. While it is not
anticipated that the new HfVN will be introduced before 2025/26, it is
Page 132

Page 133

reassuring to see that the principles embodied in the review match those
driving our West Dunbartonshire Design Standard.  Indeed, a number of the
specific proposals are already contained in our Design Standard.  For
example, our more generous space standards and dementia friendly elements
now seem set to become mainstreamed.  
4.7   Notwithstanding our commitment to improve the quality of new affordable
housing by means of the Design Standard, there is a recognition that a
degree of discretion may have to be applied in certain areas where a project
is finding it difficult to meet the full criteria.  Decisions on such matters will be
the responsibility of the More Homes Board. 
5. People Implications
5.1 There are no people implications from this report.
6. Financial and Procurement Implications
6.1 It is considered that if the principles of an improved standard are incorporated
into the scheme design at an early stage, the costs need not be overly
onerous for developers. Accordingly, there is no proposal at this stage to
increase the new build budget as detailed in the current West Dunbartonshire
Council Housing Capital Investment Plan as a result of this review.
6.2   The higher energy efficiency required by the new standard would mean more
affordable heating costs for residents leading to improved tenancy
sustainment and satisfaction, and consequently provide more of a financial
asset to the Council’s Housing Revenue Account business plan going
forward.  
7. Risk Analysis
7.1 There is a risk some potential housing providers may be discouraged from
developing due to concerns over perceived higher costs associated with the
standard.   However, there is an argument that the higher quality housing
arising from the Standard represents a better longer-term asset for the
developing housing provider.  In addition, the case has been made that better
design need not be more expensive, especially if designed-in from an early
stage. There is no evidence to suggest that the introduction of the Standard in
2015 had an adverse effect on development interest or on the new build
programme generally.  Some measures in the standard may attract additional
Scottish Government grant.  The situation would be subject to ongoing
monitoring through the More Homes Board to ensure there was no negative
impact on the delivery of the AHSP. 
7.2   The Passivhaus /zero carbon requirement will mean that specialist suppliers
will be needed for these elements with a potential for supply chain issues to
arise.   The increasing use in the industry of new energy saving technology
mitigates against this being a significant difficulty.
Page 133

Page 134

8. Equalities Impact Assessment (EIA)
8.1 The proposal following a screening does not alter any existing policy or
pattern of service delivery and so is not considered to require an equalities
impact assessment.
9. Consultation
9.1 Consultation took place through the More Homes Board which involves all the
principal departments involved in the Council’s new build programme as well
as the WD Health and Social Care Partnership.  Consultation was also held at
our Strategic Housing Providers Forum which brings together the housing
associations operating in West Dunbartonshire and our colleagues in the
Scottish Government’s More Homes Division.
9.2  A consultative presentation on the proposed changes was made to the West
Dunbartonshire Tenants and Residents Organisation (WDTRO) who have
been supportive of the measure from the outset and supported the changes
being introduced within the new standard.
10. Strategic Assessment
10.1 An improved Design Standard which contributes to improving the quality of
the Housing stock in West Dunbartonshire and improves the well-being of our
tenants would contribute to all of the Council’s strategic priorities.
Peter Barry
Chief Officer, Housing and Employability
Date: 8 November 2023
Person to Contact: John Kerr, Housing Development and Homelessness
Manager, Housing Development and Homelessness,
Housing and Employability, 16 Church Street,
Dumbarton, G82 3PU, telephone: 01389 737366, email:
john.kerr@west-dunbarton.gov.uk
Appendices: Appendix 1: West Dunbartonshire Design Standard –
Final Consultative Draft November 2023
Background Papers: Report by Strategic Lead, Housing and Employability to
Housing and Communities Committee 07 November
2018 - Review of West Dunbartonshire Affordable
Housing Design Standard  
Wards Affected: All
Page 134

Page 135

Final Draft November 2023
Affordable Housing
Design Standard
V.3 2023
ITEM 13 - APPENDIX 1
Page 135

Page 136

2 
Contents 
1 Introduction
2 Building design
3 Layout and design features
4 Minimum space standards
5 Disabled access requirements
6 Future proofing
7 External areas
8 Dementia friendly design
9 Glossary
Page 136

Page 137

3 
Foreword from Councillor Gurpreet Singh 
Convener of Housing and Communities   (to be included).   
1. Introduction: 
Purpose:
The purpose of the design standard is to ensure that the social homes being developed in
West Dunbartonshire with the support of the Scottish Government’s Affordable Housing Supply
Programme (AHSP) funding is of the highest quality and incorporates best practice design,
enabling those who live in them to enjoy a high quality home environment regardless of age,
ability or health.
Background:  
West Dunbartonshire Council has an ongoing ambitious programme of building new affordable
social homes in partnership with housing association partners. 
In April 2016, WDC introduced a design standard for housing supported by the ASHP, requiring
new homes to meet higher standards in respect of floor space, accessibility and energy
efficiency.  The Standard applied to both Council and housing association new build homes.
The last review of the Standard was carried out in 2019 resulting in the current version that
applied to all new projects starting after April 2020. 
While we have an ambition to deliver as many as possible of these much-needed new homes,
we do not wish to lose sight of quality in doing so.  When we first introduced our Standard, we
carried out extensive research and consultations that demonstrated wide support for the
measure.  The Standard has helped to drive up the quality of the new social housing being
developed across West Dunbartonshire, improving tenants’ homes now and for future
generations.  
Developers should take note of all current WDC Planning Guidance on Residential
Development as contained in the LDP.  In addition, prospective developers should be aware
that National Planning Framework 4 is now in place and forms the most up to date part of our
development plan.  It will have precedence should there be any incompatibility between it and
other parts of the development plan.  This Design Standard complements the Planning
Guidance.   
Page 137

Page 138

4 
Review Timeline:   
 Summer 2023: Carry out a review of the Design Standard with consultation taking
place with the Scottish Government, WD HSCP, RSLs and the WDTRO. 
 Report proposed revised Design Standard to the November 2023 meeting of the
WDC Housing and Communities Committee. 
 Revised Standard to apply to all new schemes commencing after 1st April 2024.  
Page 138

Page 139

5
How it works & what has changed
How the Design Standard works:
The Standard includes details of essential elements alongside a list of desirable elements
that we are asking developers to consider.  While some of these may be aspirational, we
wish to encourage innovation and continuous improvement in housing design.
We recognise that whilst we are committed to building quality new affordable housing, a
degree of discretion may be required where a project is finding it difficult to meet the full
criteria due to particular characteristics of the scheme. Decisions on such matters will
be the responsibility of the More Homes Board.
Affordable Housing Supply Programme Funding Requirements:
New Affordable Housing Investment Benchmarks introduced in June 2021 resulted in
improved subsidy levels. The revised arrangements introduced a number of additional
benchmark elements, a number of which are already contained within the Council’s
Standard, that would unlock extra grant funding. A further update is due to be announced
this summer.   
These are:
• Silver Level Energy Efficiency Standard
• Provision of balconies in flats where outdoor space is limited
• Home working or study space (outwith that required of HfVN)
• Digitally enabling
• Ducting for electric vehicle charging points
• Installation of fire suppression systems
• Provision of zero emission heating systems.
See Scottish Government Guidance: https://www.gov.scot/publications/affordable-
housing-supply-programme-process-and-procedures-mhdgn-2022-02/
Design Standard 2020 v Proposed Design Standard 2023
Key areas of the current Standard identified for possible development include:
➢ A better match of housing mix with identified housing need.  In particular, we need to
address the shortfall in larger family homes of four and over bedrooms and
developers are encouraged to contribute on this issue.
Page 139

Page 140

6 
➢ All new homes to be net-zero/zero-carbon or passivhaus standard.  Currently, the
Standard stipulates silver-plus level.
➢ We wish to look more closely at measures which can be taken to future proof our
new homes for example on how best to enable the provision of bathroom/shower
facilities to improve accessibility as the tenant’s needs change.
➢ There is an increasing awareness of the health harms that can be caused by
dampness and condensation in homes. Environmental sensors have relatively
recently been developed which can track temperature, humidity and Co2 in the
home.  We propose to make these compulsory elements of new build projects. 
The draft Design Standard contains a series of tables listing the essential and desirable
elements proposed, grouped under the following headings:
• Building design: Buildings and Energy Efficiency
• Layout and design features
• Minimum space standards
• Disabled access requirements
• Future proofing
• External areas
• Dementia Friendly design. 
Page 140

Page 141

7 
2. Building design 
Having well designed buildings is a basic requirement of our Design Standard. In addition to
being well designed, homes should be sited to take advantage of, and mitigate, any weather
conditions, for example taking into consideration sunlight and prevailing winds.  We welcome
innovative designs and solutions that make best use of their topography and location. 
Page 141

Page 142

8 
Building Design:
Buildings & Energy Efficiency
Key to the tables:
E= essential (must be provided)
D= desirable (ideally should be provided) 
Element: E: D: Comment: 
Buildings designed to have a minimum
life of at least 60 years.  X   
All new homes must achieve an EPC
rating of at least B.  X     
All new homes must be net zero or
passivhaus  ie meet at least 
- Silver Active Level, Aspects 2-8
- Platinum Level, Aspect 1 
X
We expect a similar standard will be
required by the Scottish
Government’s forthcoming Scottish
“passivhaus” standard.
An environmental sensor must be
installed in all new homes to monitor
air quality. 
X    
Careful consideration should be given
to providing the best orientation for the
properties in terms of solar gain and
potential cooling advantages  
X
Main entrance doors should be
positioned to take cognisance of
prevailing winds  
X   
Page 142

Page 143

9 
We encourage considerations of
innovative carbon reduction measures,
for example Waste Water Heat
Recovery systems (WWHRS), in new
developments   
X  Such measures may be required to
meet energy efficiency but bring with
them additional maintenance
burdens.
Page 143

Page 144

10 
3. Layout and design features 
The layout and design of a home are important features within a building and
development design.
A well designed space should not only give people the space they need to live
comfortably, with enough storage space to accommodate their belongings but it should
also offer flexibility in order to allow them to change how they use the space to suit their
needs as they change.
This guidance applies to overall layout but with specific guidance for bedrooms,
bathrooms, kitchens and common spaces. It should be noted that many of these aspects
are essential, rather than desirable. 
Page 144

Page 145

Layout and design features:
11 
Property Layout 
Element: E: D: Comment: 
Dual aspect homes must be provided.    X  
Only in very exceptional
circumstances will non dual aspect
designs be acceptable, for example
it may be unavoidable in some care
projects serves by a corridor
access.   North facing single aspect
properties will never be acceptable
nor in homes with more than three
bedrooms. 
Level access must be provided to the
principal entrances.  X  
Where topography does not allow
this, level access must be
provided to another entrance,
acceptable only in exceptional
circumstances.  Forthcoming
revised 
To meet HfVN, a home office space
must be included in every property.   X  
For dwellings over 150 m² floor
area, two home office spaces must
be provided. 
All floor plans must show a furniture
layout to comply with those set out in
HfVN and should clearly indicate where
the home office space is located. 
X 
Where a property does not have a     
garden area, we encourage the provision
of a balcony.  
X
Additional grant funding is available
for provision of balconies in certain
instances. “Juliet” balconies are
unlikely to attract the additional
grant. 
Page 145

Page 146

Layout and design features:
12 
The layout of adjacent dwellings, as
well as lifts and circulation spaces, must
seek to limit the transmission of noise
to sound sensitive rooms 
X    
Internal ceiling heights must be a
minimum of 2.4m in all habitable rooms,
measured from finished floor level. 
X  
Page 146

Page 147

Layout and design features:
13 
Bedrooms 
Element: E: D: Comment:
Double bedrooms must be capable of
accommodating twin beds.  X   
The bed space should be located such
that the bedhead is not under the
window.  
X  
Built in wardrobes should be provided
to all bedrooms, wardrobes should
have sliding or slide hung finished flush
doors, a continuous shelf and hanging
rail. The internal depth of the wardrobe
should not be less than 600mm.   
X See separate section on storage
spaces for more detail. Only in
exceptional circumstances may these
be omitted. 
Future provision for direct access from
the main bedroom to a bathroom is
desirable.  
X  
Page 147

Page 148

Layout and design features:
14 
Bathrooms 
Element: E: D: Comment:
Internal bathrooms i.e. those without
windows, should be avoided wherever
possible 
X 
Baths should not be sited under
windows 
X 
The preference is for the bathroom door
to open outwards while ensuring this
does not cause an obstruction in the
hall. 
X 
Slip resistant floor finish (m R value =
11) and integrated coved skirting to be
provided to all wet rooms; bathrooms,
shower rooms and WCs. Coving in
kitchens is preferred but optional.
X  
A dwelling should have at least one
accessible WC and wash hand basin
and at least one accessible shower/
bath, located on the principle living level
of a dwelling. 
X 
Page 148

Page 149

Layout and design features:
15 
Kitchens 
Element: E: D: Comment:
Kitchen designs must include a dining
space suitable for the size of the
household. Only in exceptional
circumstances should this be omitted.
X  
Floor spaces within the kitchen
(minimum 625mm clear width) must be
allocated for a cooker, a full height
fridge/ freezer, and a washing machine.
A dishwasher space is also
encouraged. For dwellings for six
people of more, a dishwasher space is
required and space for a tumble drier
with vent is encouraged.
X   
Slip resistant floor finish (min R value =
111_ and integrated coved skirting to be
provided to all kitchens
X  
Consideration to be given to providing
floor finishes to open plan kitchen/
dining areas, especially where it is
designed for a wheelchair user. 
X 
In eight person and over homes, there
should be a separate utility room with
space for a sink and two appliances as
a minimum. 
X  Consideration should be given to
providing a utility room in five person
and over homes.
Page 149

Page 150

Layout and design features:
16 
Stairs, Hallways, Storage &
Circulation Space 
Element: E: D: Comment:
Tapered treads must be avoided in the
design of stairs
X  
Ceilings over stairs must be lower to
match the rake of the stairs for ease of
maintenance, while maintaining the
required minimum 2000mm head- room.
X  
Entrance doors to dwellings must have
a minimum clear opening of 870mm
X  
All external close entrance doors to
be power assisted.
X  
All corridors must have a minimum
width of at least 1200mm (+ an
increase at change of direction to allow
a 1.5m turning circle).
X  New HfVN guidance is proposing
the same. 
Internal door widths must be a minimum
850mm clear width.
X  New HfVN guidance is likely to
introduce 850mm.  We should
increase to 850mm too.
The maximum depth of a storage
cupboard should be 1m. At least one
cupboard should be free of hot water
cylinders, boilers, heat exchangers,
washing machines and the like and all
part of the cupboard should be a
minimum of 2000mm high. 
X 
Page 150

Page 151

4. Minimum Space Standards 
Having the space you need and a home layout that allows you to live an active and
comfortable life is our priority regardless of your age, ability or family structure. 
Whilst existing homes may represent a challenge new build properties can aspire to deliver
the best space standards and layouts and thus we have established minimum space
standards to govern new developments. 
These space standards include a guidance for the required standards for wheelchair
users. In order to address the needs of wheelchair users within our communities as it
stands at least 10% of properties in new developments must be entirely wheelchair
friendly. 
16
Page 151

Page 152

Minimum Space Standards: 
18 
General needs 
Minimum Net Floor Area
Number of
bedrooms/ people
One-storey
dwellings (m2)
Two-storey
dwellings (m2)
Three- storey
dwellings(m2)
1 bedroom
(1 person) 33.0  
1 bedroom
(2 person) 50.5  
3 person 61 68 
4 person 73.5 79 
5 person 82.5 89.5 98.5
6 person 90 97 102.5
7 person 111.5 114.5 118.5
8 person 120.5 123.5 127.5
9 person 129 132 136 
The above areas are based on the New Floor Areas, defined as:
• Living rooms, dining rooms, bedrooms, kitchens, bathrooms, shower rooms etc.
• General storage space including areas occupied by fitted cupboards
• Halls and staircases. 
It excludes:
• Common Corridors, landing stairwells and areas of a shared nature
• Areas where the headroom is less than 1.5m
• Common utility rooms. 
Page 152

Page 153

Minimum Space Standards: 
18 
Wheelchair Accessible 
Minimum Net Floor Area
Number of
bedrooms/ people
One-storey
dwellings (m2)
Two-storey
dwellings (m2)
Three- storey
dwellings(m2)
1 bedroom
(1 person) 43  
1 bedroom
(2 person) 58.5  
3 person 75 82 
4 person 87.5 93 
5 person 100.5 107.5 116.5
6 person 108 115 120.5
7 person 122.5 136.5 140.5
8 person 133 151 155
9 person 147.5 161.5 165.5 
The above areas are based on the New Floor Areas, defined as:
• Living rooms, dining rooms, bedrooms, kitchens, bathrooms, shower rooms etc.
• General storage space including areas occupied by fitted cupboards
• Halls and staircases. 
It excludes:
• Common Corridors, landing stairwells and areas of a shared nature
• Areas where the headroom is less than 1.5m
• Common utility rooms.
Page 153

Page 154

20 
Minimum bedroom sizes:
General Needs/Wheelchair
Accessible 
Element: E: D: Comment:
Single bedrooms: the minimum floor
area for a single bedroom, exclusive of
built wardrobes, is 8m2 and must be a
minimum of 2150mm wide.
Should have a wardrobe min 600mm by
800mm   
X  
General needs 
Double bedrooms: the minimum floor
area for a double/ twin bedroom,
exclusive of built in wardrobes is
12.5m2.
One double or twin bedroom must be at
least 2750mm wide and the others
2600mm wide.
Should have a wardrobe min 1200mm
by 600mm.   
X   
General needs 
The minimum floor area for a single
bedroom is 10 m2 for wheelchair
housing.
X  Disabled access
The minimum floor area for a
double/twin bedroom is 15.5 m2 for
wheelchair housing.
X  Disabled access
Page 154

Page 155

20 
5. Disabled access requirements 
Those who require the use of wheelchairs or have other challenges can potentially benefit
the most from purposefully designed space. 
It can allow them to comfortably enjoy their home, undertake activities with their friends
and families which would otherwise been challenging and hopefully be independent and
active within their communities. 
Therefore, whilst we have provided particular space standards for wheelchair accessible
homes, we have also in this section identified design features which should be
incorporated in general homes where appropriate, in order to accommodate and future
proof new developments for those with disabilities. 
It should be noted that the HfVN standard is currently under review by the Scottish
Government and that changes can be expected by the end of 2023/24. 
.
Page 155

Page 156

21 
Disabled access requirements:
Design considerations 
Element: E: D: Comment:
75% of G/F houses must be provided
with a walk in shower unless there are
especially difficult site constraints.
Where a bath is fitted in a G/F, a wet
floor must be provided.
X  Interesting that one Housing
developer already has a higher level
of provision. 
Consideration to be given to using
contrasting colours and finishes around
the doors to aid recognition for those
with site impairment. 
X Something similar is likely to be
introduced under the new HfVN. 
For the benefit of people with sight
impairment, floor surfaces must not be
heavily patterned or of a gloss finish as
this causes glare.
X  
Door numbers and external door bells
must be clearly visible against their
background to assist people with a
sight impairment.
X  
Letter boxes should have cages to
collect mail. 
X 
Where possible, all homes should have
a G/F bedroom or future proofing
option.   
X This is especially important for
homes with 4 beds and more. 
Page 156

Page 157

22 
6. Future proofing 
West Dunbartonshire Council is committed to the development of homes that are not
simply fit for purpose now but will continue to be high quality homes over the long term,
heated and powered from sustainable sources and incorporating technology for SMART
homes. 
Ensuring homes are future-proofed means investing in internet connectivity at the
development stage and including home working from space appropriate for 21st century
lifestyles. 
Page 157

Page 158

Future Proofing:
23 
Sustainability 
Element: E: D: Comment:
Measures that support the aim of
decarbonising the grid, including
provision of district heating systems
(DHS), are encouraged. 
X Our Queens Quay
DHS is being rolled
out in Clydebank and
we would welcome
similar elsewhere.
LED lighting is preferred for communal
areas. 
X 
Consideration should be given to the
inclusion of smart meters when second
generation models, not tied to particular
energy suppliers, when available. 
X 
Consideration should be given to
incorporating mobile phone app based
technology for managing home energy
and security. 
X 
Page 158

Page 159

Future Proofing:
24 
Internet ready 
Element: E: D: Comment:
The Design Standard requires the
provision of a home office space (see
above and HfVN).
X  
Provision of a communal satellite &
Freeview television system must be
specified for flatted properties in
developments. Consideration
should be made for additional points
in the bedroom.    A dual satellite
dish such as Freebird should be
considered, to allow wider access to
international channels.
X  
Provision must be allowed for ‘fibre to
the premise’ so that any ISP can be
utilised by the occupier
X  
Inclusion of a cheap high speed fibre
internet package through a particular
provider should be considered. 
X 
Page 159

Page 160

25 
7. External areas:   
Creating Places details the Scottish Government’s vision to protect and enhance the built
environment while their policy document Designing Streets promotes an approach to street
design that challenges the primacy of motorised vehicles in neighbourhoods. Both our Local
Development Plan (LDP) and Local Housing Strategy (LHS) put a strong emphasis on
supporting these place-making principles and the ideas around 20-minute neighbourhoods. 
Developers should take note of all current WDC Planning Guidance on Residential
Development as contained in the LDP.  This Design Standard complements the Planning
Guidance.  The LDP will be subject to future amendment in view of the recently introduced
National Planning Framework 4 (NPF4). NPF4 places an obligation on local authorities to
meet the housing needs of people living in Scotland in particular older people and those with
disabilities. 
Page 160

Page 161

External areas: 
29 
Sustainability 
Element: E: D: Comment:
Building Standards require the provision
of an accessible space to allow for the
safe, convenient and sustainable drying
of washing (3.11.6). Drying space must
be integrated into the design of external
spaces. Such provision may be shared,
provided the arrangement is practical.
X  One Housing Developer provides on
occasions washer driers instead of
outside space.
Source Control Drainage shall be
employed to minimise SuDS
requirements and to provide a natural
solution to rainwater runoff. This shall
include maximising permeable elements
in hard landscape areas subject to
discussion with WDC
Roads.
X  
External lighting units will be subject to
consultation with WDC Roads but must
not distribute light above the horizontal
plane.
X  
Provision for Electric vehicles should be
considered beyond the current technical
standards - Section 7.2 June 2023
(charging points and ducting for future
provision of the points). 
X    
Page 161

Page 162

External areas: 
29 
Roads & Car Parking 
Element: E: D: Comment:
Developers should engage at an early
stage with the Roads Authority to agree
upon an environmentally sustainable
solution which seeks to minimise car
parking spaces. 
X We would encourage developers to
minimise the provision of parking
space, whilst meeting the
requirements of WDC Roads Dept
and having considered the nature of
housing.
Normally, Social Housing car parking
should be provided at a level 1-step-
down from PS mainstream
developments: i.e. 1.5 spaces per
dwelling with 3 or fewer bedrooms and
2 spaces per dwelling with 4 or more
bedrooms. An acceptable design can
include areas of landscaping showing a
superimposed parking layout to the
levels agreed with the Roads Authority,
conforming to NRDG dimensions.
X  
Areas of car parking should be
designed to encourage other uses,
such as play. A Designing Streets
approach should be employed. 
X 
Page 162

Page 163

External areas: 
29 
Paths, Fencing & Cycles 
Element: E: D: Comment:
Public footpaths and paths to houses
must be a minimum 1200mm wide and
should have a 1:100 cross fall.
X  
Cycle parking should be provided for
flatted developments at the rate of 1
space per dwelling, in line with Cycling
By Design 2010. This should be located
at ground level and be in a secure,
covered environment (e.g. part of the
building or a lockable compound) 
X 
Timber boundary fencing of gardens
should not back directly onto public
spaces, including paths. Consideration
should be given to running a
hedge/planting strip behind the
boundary.   
X
Page 163

Page 164

External areas: 
29 
Gardens 
Element: E: D: Comment:
Planting where provided should include
edible fruit species. 
X 
Front garden areas should contain
hedges/taller shrubs to give a sense of
privacy. Appropriate tree planting is also
encouraged where space permits. 
X 
Where timber board fencing is used to
define rear/side boundaries, self-
clinging/ climbing plants or specimen
shrubs should be used to break up the
monotony. 
X 
A minimum useable garden space of
50m2 should be provided for each
house. For flats, a minimum of 10m2
should be allowed per unit. 
X It is recognised that a balance
requires to be struck between the
amenity provided by the garden
and the maintenance burden it
may place on the tenant or
housing developer.  
Any areas of grass should be of a size,
shape and accessibility which facilitate
ease of maintenance.   
X Every effort should be made to
avoid any “left-over space” which
would give maintenance
difficulties. 
Page 164

Page 165

30 
8. Dementia friendly design: 
Housing will play an increasingly important role in improving the conditions for people with
dementia.  WDC designates particular houses or projects as being “Dementia Friendly”.
These houses employ a full range of assistive design measures, with the WD HSCP
providing design advice.  There is value in considering incorporating some of these
elements as a matter course in mainstream housing as a future-proofing measure,
particularly in ground floor properties. 
The principles outlined in this section apply not only to those with dementia, but also to other
people who would benefit from assistive measures including those with physical disability
issues.
8
Page 165

Page 166

Dementia friendly design:
34
44
General features: 
Element: E: D: Comment:
Flooring should be of a consistent tone  X 
Noise pollution should be minimised
where possible 
X Even more important in Dementia
Friendly homes. 
Allow for easy installation of future
telecare items 
X Further advice is needed on any
items which should be installed as a
matter of course.
In appropriate locations, consideration
to be given to wall/ceiling
structures capable of future installation
of hoist and track systems 
X 
Care should be taken in selecting
windows handles. Difficult to open
handles or ones in contrasting colours
may be appropriate 
X 
Two electric double sockets must be
made available next to the
telephone socket to allow for future
telecare items
X  
Spy holes should be provided to
external doors (one at standing level,
the other for wheelchair users) 
X 
Consideration to be given to provision
of power switches which are in
contrasting colours to the wall 
X 
Page 166

Page 167

Dementia friendly design:
34
44
Lighting & External areas 
Good lighting is particularly important for people with Dementia. Where possible,
developers should seek to maximise lighting especially at key areas such as sinks,
worktops, bathrooms and external pathways.  Many of the design elements below apply
equally to mainstream housing. 
Element: E: D: Comment:
Consider night time lighting pathways to
bathrooms 
X 
Light switches should be in a
contrasting colour 
X 
For some client groups dimmer lights in
living room and bedrooms are beneficial 
X 
Element: E: D: Comment:
Non-slip paving must be employed X  
Pathways must be well lit X  
Extra care should be taken creating
short and clear access routes to bin
stores and drying areas 
X 
Consideration should be given to
providing raised planters in gardens 
X 
Planting of scented varieties is
encouraged, especially near paths and
doorways 
X 
Page 167

Page 168

Dementia friendly design:
34
44
Kitchens 
Element: E: D: Comment:
There should be a continuous worktop
between oven and sink 
X 
At least some cupboards should have
glazed doors(or shatterproof clear
material) 
X 
Cupboard door handles should be of
contrasting colours 
X 
Taps should be lever, not mixer, and
marked “H” and “C” in red and blue 
X 
Worktops should be of a solid colour,
not patterned, and should be of a
matte finish 
X 
Sinks should be of generous
dimensions 
X 
Install non-slip flooring X  
Page 168

Page 169

Dementia friendly design:
34
44
Bathrooms 
Element: E: D: Comment:
Taps should be lever, not mixer, and
marked “H” and “C” in red and blue 
X 
WC should have traditional handle flush
levers or raised buttons 
X 
Consideration to be given to painting
bathroom doors in strong
contrasting colour 
X 
Provide large wash hand basins X  
Install non-slip flooring X  
Glare from tiles/wet boards should be
minimised. Use a matte finish. 
X 
In wet rooms, which will have coved
skirting, a contrasting capping strip
should be included to make it clear
where the floor ends and the wall
begins. 
X 
Showers should have an automatic
timed switch off/maximum
temperature control 
X 
Page 169

Page 170

35 
9. Glossary 
Term Description
Affordable
Housing Supply
Programme
(AHSP) 
The principal Scottish Government grant funding for Council and
housing association new build.
Dementia Friendly
Design
Design features which can support those affected by the condition
to live longer independently.  
Duel Aspect A property with windows on two or more walls. 
Energy Efficiency
Standard for
Social
Housing 1 & 2
(EESSH)
Measures introduced by the Scottish Government to improve
energy efficiency and reduce fuel poverty. The standard sets out
milestones for social landlords to reach by set dates. 
Fuel Poverty
A household is deemed to be in fuel poverty if more than 10% of
its income is spent on fuel use. 
Housing for
Varying Needs
(HfVN)
Housing for Varying Needs: a design standard that requires new
dwellings to be designed to be barrier free internally to ensure that a
wide range of needs can be met. All homes funded through the
AHSP must at least meet this standard.  The standard is currently
under review.  
Page 170

Page 171

Glossary
37
73
Term Description 
Local
Development
Plan (LDP)
The Local Development Plan: the statutory land use planning
framework for West Dunbartonshire. The plan covers the whole of
West Dunbartonshire with the exception of the area within the
Loch Lomond and the Trossachs National Park. The current plan
is the Proposed Local Development Plan 2, agreed for adoption
by Planning Committee on the 19 August 2020. It covers the
period to 2030. 
Local Housing
Strategy (LHS)
The Local Housing Strategy: the statutory document setting out
the strategic housing priorities over a rolling 5-year period. The
current version is the More Homes Better Homes West
Dunbartonshire Local Housing Strategy 2022 – 2027.
National Roads
Development
Guide
(NRDG)
The National Roads Development Guide is Scotland’s principal
guidance on roads, produced by the Society for Chief Officers of
Transport in Scotland. 
Place and Design
Panel
A forum convened by West Dunbartonshire Planning that works
collaboratively with developers, architects and the likes to provide
advice and assistance in pre-application proposals to help ensure
projects contribute to a culture of design excellence.
Standard
Assessment
Procedure
(SAP) 
Standard Assessment Procedure: a government energy rating for
homes.
Page 171

Page 172

Glossary
37
73
Term Description
Strategic Housing
Investment Plan
(SHIP)
Strategic Housing Investment Plan: the annual document that sets
out the funding priorities for affordable housing in West
Dunbartonshire for the next five years and published every
November. 
Silver Standard
A sustainability level detailed in the Scottish Government’s
Building Standards Part
1: Technical Handbook – Domestic (Part 7.1 Statement of
Sustainability). Sometimes referred to as Greener standard. 
Silver Active
Level
The sustainability level above Silver, which requires the inclusion
of use of a low and zero carbon generating technology (LZCGT),
usually meaning the inclusion of wind turbines, photo voltaic cells,
combined heat and power units (fired by low emission sources) or
some such items.
Sustainable
Drainage System
(SuDS)
A Sustainable Drainage System manages the impact of new
developments on surface water drainage discharges. It may
involve elements such as water retention basins and
permeable surfaces. 
Telecare
The range of equipment and services available to assist a person
to remain safely in their own home. It includes things like
movement and fall detectors, panic buttons and automatic
medication management.
Page 172

Page 173

38 
Glossary 
Term Description
Waste Water Heat
Recovery Systems
(WWHRS)
Waste Water Heat Recovery Systems are energy saving devices
that recover heat/energy from waste water and use it for other
purposes.
West
Dunbartonshire
Health and
Social Care
Partnership
(HSCP)
The health and social care integration body with delegated
authority from the NHS Greater Glasgow Health and West
Dunbartonshire Council.
Wheelchair
Accessible
Standard
An accessibility standard requiring more than HfVN. These are
homes with significantly increased floor areas.
Elements might include, for example, particular features in
kitchens and bathrooms, hoist systems linking bedrooms to
bathrooms and storage space for 2 wheelchairs. As defined under
Housing for Varying Needs Part 1 - wheelchair standard.
Page 173

Page 174

39
If you have any questions or require clarification, please
contact: 
Jamie Dockery
Senior Housing Development Officer
Jamie.dockery@west-dunbarton.gov.uk
Page 174

Page 175

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 22 November 2023
___________________________________________________________________
Subject:     “Home at the Heart 2019-24” West Dunbartonshire’s Rapid Re-
housing Transition Plan update and new approaches to
homelessness progress report
1. Purpose
1.1 The purpose of this report is to provide members with an update on “Home at the
Heart” our Rapid Re-housing Transition Plan (RRTP) for the period 2019-24 and
new approaches to homelessness, including;
- Progress update for Year 4 and Year 5 plans,
- an update on Scottish Government funds to assist in the delivery of the RRTP
- Lettings requirements for Year 5 of the plan, 2023/24 seeking agreement.
- Changes to local connection
- Update on the Scottish Government Response to the recommendations of the
Temporary Accommodation Task and Finish Group
2. Recommendations
2.1  It is recommended that the Housing and Communities Committee:
(i) Note the progress and challenges made in the first four years of “Home at
the Heart”, which will informed a report to the Scottish Government at the
end of August 2023 and note the main objectives for Year 5 in 4.16 - 4.26;
(ii) Note that the Council’s housing allocation letting target for homeless
households is 69% for 2023/24 as set out in paragraph 4.20 of this report
and note the Chief Officer, Housing and Employability will keep this target
under close review based on current modelling projections;
(iii) Note the continued uncertainty around future funding and specifically the
risk to our Housing First approach;
(iv) Note and approve that the Scottish Government funding of £251,146 has
been awarded for 2023/24 for the specific delivery of the West
Dunbartonshire Rapid Rehousing Transition Plan;
(v) Approve the new Monitoring template of our Rapid Rehousing Transition
Plan including spend attached as Appendix 1 to this report;
(vi) Note impacts of legislative changes around Local Connection
ITEM 14
Page 175

Page 176

3. Background
3.1 Our current approach to tackling homelessness is outlined in our RRTP “Home at
the Heart” and reinforced within the new Local Housing Strategy approved by the
Housing and Communities Committee in November 2021. This approach builds on
the good progress made within West Dunbartonshire by previous strategies, most
recently our “More than a Roof” approach which covered the period 2017/2020,
whilst also acknowledging the challenges set by the renewed Scottish Government
national commitments to tackle homelessness, to end rough sleeping and to
transform temporary accommodation.
3.2 “Home at the Heart” was developed in response to a key recommendation from
the Homelessness and Rough Sleeping Action Group (HARSAG) that was
adopted by the Scottish Government, for Local Authorities to develop and submit
a RRTP for the period 2019-2024.
3.3 It was developed in partnership with key stakeholders, including HSCP and the
wider Housing Solutions Partnership, which includes local Registered Social
Landlords.  It was submitted to the Scottish Government on 31 December 2018
and retrospectively approved by the Housing and Communities Committee on 6
February 2019.
3.4 The feedback received from the Scottish Government in relation to our RRTP
has been positive and has highlighted a number of areas of good practice
including:
• The comprehensive temporary accommodation modelling undertaken as part
of our wider “More than a Roof” approach;
• The strategic approach to tackling homelessness;
• The introduction of the supported tenancy model;
• Prioritising Housing First as a housing solution;
• Our award winning Leaving Care Housing Protocol; and
• The fact that WDC has never breached the Unsuitable Accommodation
Order. (prior to 2022/23)
3.5 Regular reports have been provided to the Housing and Communities
Committee, initially detailing and seeking approval for our RRTP and
subsequently providing updates in terms of progress being made and approving
the use of Scottish Government funding in order to deliver our key objectives.
4. Main Issues
4.1 The aims of “Home at the Heart” in terms of tackling homelessness are
influenced by the Scottish Social Housing Charter and consistent with the
Scottish Government’s “Ending Homelessness Together” approach and are
structured around the following four strategic objectives:
• Deliver a whole systems approach to the prevention of homelessness;
Page 176

Page 177

• Enable service users with low or no support needs to access settled housing
quickly;
• Develop interim housing options which enable independent living and
tenancy sustainment; and
• Implement a Housing First model which enables the most excluded service
users to secure sustainable housing.
“Home at the Heart” Year 4 Progress
Objective 1: Deliver a whole systems approach to the prevention of
homelessness.
4.2 The Prevention Officer has continued to engage with households at risk of
homelessness. This has included managing the pilot prevention fund which has
made payments direct to households totalling £20,600 and has helped ensure
that 53 existing tenancies were sustained.
4.3 The overall number of approaches to our Housing Options service had
increased significantly in 2021/22 linked to the Tenant Hardship Fund but we
have continued to see high demand 2022/23.  We have prevented 72% of cases
from becoming homeless. 
2018/19 2019/20 2020/21 2021/22 2022/23
Prevent1 approaches 178 240 332 576 455
Prevent1 closures 177 221 249 378 654
% homelessness prevented 64% 57% 51% 52% 72%
% closed with presentation 24% 26% 27% 31% 18%
4.4 There has been an increase in Section 11 notices since changes to the cost of
living emergency powers on evictions, going from 20 in 2020/21 to 144 in
2022/23. Of those where contact was made and there was engagement with
the household, homelessness was prevented in 80% of cases up from 62.5%
last year.
Objective 2: Enable service users with low or no support needs to access
settled housing quickly.
4.5 One of the key objectives of our RRTP is to ensure that homeless households
are able to access settled accommodation as quickly as possible. Our key
target is reducing the length of time homeless households with no/low support
needs spend in temporary accommodation.
4.6 We have developed a RRTP model which takes into account the level of new
homeless decisions, the backlog of homeless households, projected future
demand, the number of lets made to homeless households and projected letting
activity. The RRTP model uses this data to determine the number of lets that will
be required for homeless households on an annual basis and determines a
projected lettings % target.
Page 177

Page 178

Calculation of homeless lets required and % of expected
letting activity required to meet need - split by LA & RSL 
Year 4
target  Year 4 actual
Lets required to meet demand 986 727
Split LA 641 465
Split RSL 345 262
% Allocation of lets required
LA 69% 60%
RSL 69% 49%*
* Percentage may alter as we were unable to get the all letting in Q4 for one RSL
4.7 The turnover of available properties was lower than projected and we still have
high numbers of voids due to issues affecting void times. 
4.8 As a result we now have 66 households who have been waiting to be housed
longer than a year, of which 28 are in temporary accommodation.  There are now
269 households in temporary accommodation including 100 children as at the nd
of October 2023.  This is a 16% increase in the corresponding date in 2022.
4.9 As a result, our average times for 2022/23 increased and failed to meet the
target of 15 weeks, we reported 17.5 weeks.
Objective 3: Develop interim housing options which enable independent
living and tenancy sustainment.
4.10 We continue to provide a range of interim housing options for those homeless
households with more complex support needs. This includes supported
tenancies in the community, as well as residential supported accommodation
where this need is identified.
4.11 Residential supported accommodation offers temporary accommodation and on-
site support to alleviate homelessness and enable homeless households to make
a planned transition to settled accommodation.  Due to recruitment delays we
were unable to take forward the recommendations of the review of supported
accommodation as planned.
Objective 4: Implement a Housing First model which enables the most
excluded service users to achieve housing sustainment.
4.12 A key objective in Year 4 of our RRTP was the upscaling of our Housing First
approach for those households with the most complex needs. The available
funding allowed to fund the 8 housing first workers but did not allow to expand
the service further.
4.13 By the end of 2022/23, we had created 15 new Housing First tenancies, a
further 4 clients are awaiting an offer of settled accommodation being made.
4.14 Due to several households “Stepping Down”, meaning a planned exit from the
Housing First Service has meant we have there has been additional capacity
created therefore an additional 4 tenancies can be created in Year 4.
Page 178

Page 179

4.15 Whilst our Housing First approach continues to have a high tenancy
sustainment rate at 91%.  Sadly four of these tenancies have ended due to the
death of tenants and for the first time two ended due to tenancy management
issues.  However, long term future funding for the initiative is still to be clarified.
Year 5 main objectives
Objective 1: Deliver a whole systems approach to the prevention of
homelessness.
4.16 To enable the prevention fund to be a tool to prevent homelessness allocated
£10,000 from this years’ RRTP Scottish Government funds to top up the carry-
over of £1,263 not spent last year.
4.17 The changes to the allocations policy with the creation of a youth priority has
now been fully rolled out and will begin to have a positive impact by reducing
homeless presentation for those who now benefit from the youth priority list. 
Objective 2: Enable service users with low or no support needs to access
settled housing quickly.
4.18 The time spent in temporary accommodation has been adjusted to account for
an increase last year and the supply of properties declining to 15 weeks.
4.19 Currently modelling suggests that due to an increased backlog, increased
demand and reduced available turnover that for 2023/24 for West
Dunbartonshire, 103% of all available social tenancies inclusive of conversions
and housing first will require to be allocated to homeless households to ensure
targeted reductions in temporary accommodation and faster access to settled
accommodation is achieved.
4.20 While this cannot be achieved, and recognising other housing need factors it
would not be practical to have 100% allocation of lets to homeless households.
Therefore we asked our partners to agree to a 69% lettings target to homeless
households. This objective was supported by the Housing Improvement Board
in terms of lets made by WDC and a similar commitment was sought from our
RSL partners via their annual RRTP Contribution Statements.
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL 
Year 5
Lets required for to meet demand 932
Split LA 621
Split RSL 311
Projected turnover  Year 5
Split LA 900
Split RSL 450
% Allocation of lets required  Year 5
LA 69% (include 5% youth
priority list applications)
Page 179

Page 180

RSL 69%
4.21 As 69% isn’t enough to fully meet demand and clear the increased backlog of
households in temporary accommodation, and will result in a shortfall of around
354 lets and 76 additional units required for temporary accommodation.  If we
require additional temporary accommodation units this means reduces lets
available for mainstream offers and would also require additional staff
resources to manage the additional units.
Objective 3: Develop interim housing options which enable independent
living and tenancy sustainment
4.22 It is expected that the keys findings of the review of Residential Supported
Accommodation will begin to be taken forward in Year 5, 2023/24 once staff
resources are in place.  
4.23 To deliver the optimum service model for residential supported accommodation,
it is anticipated that a three year plan will be required. This will include the
decommissioning of some existing services, the commissioning of new provision
in order to better meet identified need and a full financial impact assessment.  In
order to develop and lead on the development and implementation of this plan
we are seeking to recruit an additional resource to lead on the delivery of new
residential supported accommodation.
Objective 4: Implement a Housing First model which enables the most
excluded service users to achieve housing sustainment.
4.24 The available funding does not allow to expand the service further but ensure
we operate with 8 housing first support workers enabling support to continue to
be provided to the 47 active tenancies and the 2 waiting to be housed carried
over into Year 5. 
4.25 As we have 3 vacancies we are going to explore the option to procure additional
support from the Third sector as a one off exercise to be able to create an
additional 7 housing first tenancies during 2023/24
4.26 A full review of the housing first service will also be carried out during Year 5.
Rapid Rehousing Transition Plan funding update
4.27 In December 2022, the Scottish Government confirmed in its Programme for
Government that £8 million would be provided to local authorities to support
rapid rehousing plans and scale up the Housing First approach nationally for
2023/24.
4.28 The formula still being used to allocate local authorities share of this funding is
based on the number of homeless assessments made in a local authority area
over a three year period. There has been some criticism of this approach as it
does not take into account homelessness prevention work within the
assessment. It can therefore act as a disincentive to make the wider system
changes advocated within Ending Homelessness. 
Page 180

Page 181

4.29 The Scottish Government and COSLA had hoped to explore the possibility of
joining up the funding stream for preventing and responding to homelessness
with the rapid rehousing funding stream and to look at alternative distribution
formulas. However, this work has been delayed due to conflicting Covid-19
responsibilities.
4.30 The same formula has therefore been used for the funding allocation for
2023/24. This formula has resulted in an allocation for West Dunbartonshire
Council of £251, 146 to deliver Year 5 of our RRTP which was announced on
20 December.  In addition the Scottish Government also on the same date
confirmed the funding allocation of £649k to West Dunbartonshire Council for
the provision of homelessness prevention and response services.
RRTP Year 5 funding
Year 4 underspend £1,263
SG funding for Year 5 £251,146
Housing and Homelessness contribution £210,000
Year 4 total funding £462,409
4.31 Whilst the additional RRTP funding is welcome, a shortfall for Year 5 is still being
projected. A full review of Year 4 activities and refreshed our plan for Year 5 to
take account of available funding.
RRTP Year 5 costings
Housing First West Dunbartonshire £384,00
Pilot Prevention Fund £11,263
Conversion Programme £90,000
Year 5 total cost £485, 263
As there are 3 housing first support worker vacancies this will create a small
underspend in Housing First costs therefore balancing the available funds
to spend.
Changes to the Local Connection provisions
4.32 The pandemic had delayed the legislation to suspend local connection but
was enacted on 28th November 2022.
4.33 The policy intention of suspending local connection referrals between
Scottish local authorities is to remove barriers to support for people who are
homelessness or rough sleeping so they can resettle successfully, and
avoid repeat homelessness. If people are living in an area of their choosing,
they are more likely to integrate successfully into a local community and
access the services and support they require.
4.34 The Scottish Government have begun to monitor the impact of these
changes and respond to any local authorities that report undue pressure on
service provision.  Our initial impacts is we have started to see larger
families from other areas present which is adding pressure to our temporary
accommodation provision.  
Page 181

Page 182

4.35 The Scottish Government have acknowledge there has been anecdotal
impacts therefore local authorities have been asked to report impacts along
with breaches of the Unsuitable Accommodation Order.
Scottish Government response to the Temporary Accommodation Task and
Finish Group recommendations
4.36 On 19th July 2023 the Scottish Government responded to the 15
recommendations made by the Temporary Accommodation Task and Finish
group needed to address the increasing use of temporary accommodation.
4.37 The Scottish Government has stated they will;
• invest at least £60 million through the Affordable Housing Supply
programme in 2023-24 to support a national acquisition plan
• maintain momentum in delivering our Affordable Housing Supply
Programme
• work with social landlords to deliver a new programme of stock
management
• implement targeted partnership plans with the local authorities facing
greatest pressure
4.38 The West Dunbartonshire response and impact assessment is included as
Appendix 2 of this report.
5. People Implications
5.1 An additional post required to strengthen the team will be recruited in line with
the Council’s existing recruitment policy and will be funded from the Scottish
Government funding for the provision of homelessness prevention and response.
We expect the recruitment to be completed before the end of 2023.
6. Financial and Procurement Implications
6.1 The Cabinet Secretary for Social Justice, Housing and Local Government wrote
to West Dunbartonshire on 16 December 2022 advising of the Council’s Rapid
Rehousing Transition Plan funding allocation for 2023/24 of £251,146. This
funding will be included in the weekly payment of the 2023/24 General Revenue
Grant.
6.2 In addition the Scottish Government also on the same date confirmed the
funding allocation of £649k to West Dunbartonshire Council for the provision of
homelessness prevention and response, this funding will be paid as part of the
General Revenue Grant payment.
6.3 This is due to be the 5th and final year of the Rapid Rehousing Transition Plan
and dedicated funding.  However, conversations have begun about the future
but no confirmed decisions have been made but Committee will be updated at
a future meeting once we received confirmed plans beyond Year 5.
Page 182

Page 183

6.4 We are aware of some national discussions looking at reviewing funding to
deliver homelessness and housing option services, however there remains
some financial uncertainty in terms of how the Housing First approach can be
funded in the longer term.
6.5 The delivery of the wider Rapid Rehousing Transition Plan will be within existing
budgets noting the increases in such as a result of the Scottish Government
funding for 2023/24.
6.5 There are no procurement implications in terms of this report.
7. Risk Analysis
7.1 There are financial and regulatory risks associated with not being able to fully
deliver our Rapid Rehousing Transition Plan, including the Housing First
element of the approach.
7.2 The decision to award funding in Year 5 was based again on a formula which
focuses on homelessness assessments (and not the content of the RRTP’s),
arguably benefits larger local authorities who receive a higher proportion of
homeless assessments and could discourage local authorities from
implementing initiatives aimed at preventing homelessness.
7.3 There is no confirmation of funding for RRTP past Year 5 (2023/24) therefore
long term funding is required to be sourced to continue our Housing First
service.
8. Equalities Impact Assessment (EIA)
8.1 There are no negative equalities impacts due to this update to our RRTP however
preventing and responding to homelessness has a significant positive impact on
individuals and communities. There are some potential positive impacts for some
groups as noted in the EIA carried out when our RRTP was updated in July 2023
EIA 766.
9. Consultation
9.1 The first draft of our RRTP was developed in collaboration with key partners,
including the Health and Social Care Partnership, local Registered Social
Landlords and third sector organisations, via a series of well attended
stakeholder events held in November and December 2018.
9.2 Consultation and communication have continued since the submission of the
first iteration of the RRTP through the Housing Solutions Partnership. Further
engagement has also taken place with other local landlords via the Strategic
Housing Providers Forum, engagement has continued with the Health and
Social Care Partnership and also a dialogue with the WDTRO regarding the
implementation of the RRTP and Housing First has also taken place.
10. Strategic Assessment
10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities.
Page 183

Page 184

Peter Barry
Chief Officer, Housing and Employability
Date: 8 November 2023
___________________________________________________________________
Person to Contact:  John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability, telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk 
Appendices: 1. RRTP Monitoring Report 2023/24
2. Temporary Accommodation Task and Finish Group Impact
Assessment, October 2023
Background Papers: HARSAG2 recommendations tracker, West Dunbartonshire
Council Housing Development and Homelessness Team,
December 2021
West Dunbartonshire Council’s Revised Rapid Rehousing
Transition Plan including Action Plan and Equalities Impact
Assessment, Home at the Heart 
Housing and Communities Committee Report 24th August
2022 “Rapid Rehousing Transition Plan and new
approaches to homeless update”
Letter from Shona Robison, MSP, Cabinet Secretary for
Social Justice, Housing and Local Government on
Distribution of Funding for Rapid Rehousing Transition Plans
for 2023/24; 16 December 2022
Ending Homelessness Together – High Level Action Plan;
Scottish Government/COSLA
https://www.gov.scot/binaries/content/documents/govscot/p
ublications/publication/2018/11/ending-homelessness-
together-high-level-action-plan/documents/00543359-
pdf/00543359-pdf/govscot%3Adocument
Wards Affected:   All 
Page 184

Page 185

1
Scottish Government Ending Homelessness Together Fund
RAPID
REHOUSING
TRANSITION
PLAN
2022/23 Monitoring Report
ITEM 14 -APPENDIX 1
Page 185

Page 186

2 
Rapid Rehousing Transition Plans Monitoring Report 
In previous years, we have asked all local authorities to provide a written report
detailing how they have spent their allocation of funding including funding carried
over from previous financial years.  For this return we are refocusing on the
outcomes of rapid rehousing transition plan spend and have included four questions
which ask local authorities to provide qualitative information to capture an overview
of rapid rehousing transition plan (RRTP) progress and challenges between 2019-
2023. 
These questions are designed to identify where RRTP funding has improved
outcomes for people experiencing homelessness, to identify best practice and
highlight where more support is needed.  It is a free text return designed to allow
local authorities to capture successes and challenges.  We are also seeking
anonymised case studies of people who have directly benefitted from the
implementation of RRTPs in local authority areas.  This qualitative information will be
used in the consideration of future funding.   
Please complete this report and include it with the latest version of your RRTP for
2022-23 and updated EQIA by 25 August 2023 to:
RapidRehousingTransitionPlansMailbox@gov.scot. 
Page 186

Page 187

3 
Please provide an overview of progress/outcomes since the implementation of your RRTP
including anonymised case studies where helpful to demonstrate outcomes. 
Word guide: approximately 500 words per question. 
Can you describe how implementation of your RRTP has helped prevent
homelessness within your local authority area?
The ring fenced funds allowed for options to be explored and trialled at a quicker pace. 
Which isn’t always the easiest when budgets are limited within Local Authorities.  Being
able to explore options then allowed for monitoring to take place to assess the impact at
preventing homelessness which meant some options were mainstreamed and others we
used as lessons learnt. 
One of the early pilots trialled was made a permanent part of our structure after
assessing the impact was a dedicated prevention role.  We created a temporary
Enhanced Prevention Officer to work and concentrate on section 11 notices.  Previously
this was shared between all caseworkers via the duty service.  The dedicated role seen
greater engagement with our service which ultimately prevented homelessness occurring. 
This role itself also allowed for more options to be trialled to prevent homelessness.  We
were able to create a small prevention fund which then encouraged earlier approaches to
our service for assistance and therefore stopped court action.  Without dedicated funds
this may not have been possible due to continued budget cuts.  53 referrals have
received payment and approximately 50 are all continuing to sustain tenancies. 
CASE STUDY
Received a referral to the prevention fund from a RSL prior to them issuing a section 11
notice for one of their tenants.  Their tenants had a low level arrears balance due to a
change in employment however their arrears began to escalate.  The main earner went
off sick for 6 months only receiving SSP and the partner gave birth prematurely.  This
lead to their arrears increasing to around £2,000 at the time of the referral.  This
household didn’t have knowledge of benefits and entitlements as they were always in
employment.  Through engagement with our Prevention Officer they were assisted with a
DHP claim and helped to update a Universal Credit claim to include housing costs.  They
also received a payment of £400 from the prevention fund for an affordable repayment
plan to be reached for the remainder of the balance and no further action taken on the
tenancy. 
We are also in a pilot process with one of our RSL partners where they are sending
earlier section 11 notices, again to assist with engagement and being able to have more
options available to try to help prevent any evictions from taking place. We are due to
analyse the impacts this can have but early indications show positive impacts. 
Through our Youth Pilot with Action for Children and still having high youth homelessness
in the local authority area we looked at reviewing our allocations policy.  Following
consultation and Committee approval it was agreed to add a youth priority group to our
allocations policy.  The intention behind this is that it will reduce the need for young
people to enter the homeless service to be housed therefore reducing presentations. As
part of this we have a dedicated youth resettlement worker to assist and boost tenancy
sustainment. 
Page 187

Page 188

4 
CASE STUDY
21 Year old female presents for advice, not roofless but lives with mother who has
addiction issues (Aug 22).  Then finds out she is pregnant and can no longer live at her
mothers.  Discuss all housing options; rent deposit, private let and homeless presentation
so can make an informed decision.  Nov 22 Youth priority is rolled out so this option is
then discussed and application updated (18 wks. pregnant).  She is then made an offer
and housed in Feb 23, resettlement assisted with DHP and Community Care Grant. 
Our Housing First service has enabled a 91% tenancy sustainment rate for those who
have been in and out of our homeless service therefore reducing repeat homeless
presentations. 
Can you describe how implementation of your RRTP has helped speed up the
process of rehousing homeless households?
The development and subsequent implementation allowed for discussions with all
partners to begin and be agreed about increased allocations to households experiencing
homelessness.  These discussions were both internally with our colleagues in Housing
Operations and our Registered Social Landlords.  The focus and commitment from the
Scottish Government encourages a more open conversation.  Historically there has
always been a push back to allow more than 45/50% of lets to be allocated to those in
homelessness need. 
The agreed time targets set out in the plan ensured there was both a strategic and
operational focus. New review processes introduced as part of managing an open HL1. 
Cases were reviewed their areas of choice at 30 days, and again at 60 days where more
areas had to be added.  When external factors began to affect void times, new Void
meetings were set up with an action plan to mitigate external impacts affecting void times. 
It helped look at things in different ways to try and speed things up.  For instance looking
at older cases why not on offer and finding solutions such as focusing acquisition
programme to meet a family’s need. 
It ensure all areas offices operated to maximise the use of section 5 by sending to
multiple landlords who had suitable stock for the household and not one at a time.  This
removed waiting 6 weeks between each by the caseworker closely managing offers and
updating relevant landlords quickly. 
New discussions and new perspective on doing things meant our supported
accommodation carried out a review of their timescales of the work we carry out. For
example the review timescale used to be 12 weeks, we have now reduced this to every 6
weeks which has helped up speed up the process for people being put on the housing list
waiting for an offer of housing. 
It helped to break old ways of working.  For instance, young people going into supported
accommodation if they’ve never had a tenancy. It was a practice seen as practical help
but by changing default start positions to always be low need and only work up based on
information and assessment.  Doing this means if more people assessed as low/no
support needs our aim would then to be rapid rehouse. 
Conversions “flipping” were an option prior to RRTP.  What the implementation of our
RRTP helped was make this a more readily available option by having a larger budget to
offer it to more households.  This has helped reduce transitions, and help rehouse some
households quicker than if they had to wait for a ready to let property.
Page 188

Page 189

5 
CASE STUDY
Single female in her 50s presents in March 2023.  She is made an offer of housing which
is still under repair in June 23.  Following discussions with the caseworker she states she
likes where she is and is happy.  Caseworker speaks to colleagues to establish if it is an
option to convert this temporary unit, and it is confirmed it is.  Further discussions take
place with applicant, housing operations and homeless services to get this moved on as
quickly as possible.  The conversion takes place and the tenancy is converted over to a
SST on 10th July 2023. 
How has implementation of your RRTP affected the numbers of households in
temporary accommodation and the time spent there? 
Table below shows the numbers of households in temporary accommodation in West
Dunbartonshire at the end of each of the first 4 years of RRTP and the average times
spent in the temporary accommodation: 
2019/20 2020/21 2021/22 2022/23
No in temp 264 296 253 285
Avg time  15 wks 19 wks 16.5 wks 17.5 wks 
We were reporting an average of 23 weeks in temporary accommodation before the
implementation of rapid rehousing.  Our aim when the plan was initially written was to
reduce this to 13 weeks by the end of year 5. 
The renewed focus and new initiatives in place managed to make significant progress in
the first year around times in temporary accommodation.  In the second year we began
trying to put focus on older cases which impacted the average times.  There were also
some new builds beginning to be allocated, some of which had delays impacting times. 
Despite this we were still on track in terms of times.  However, the numbers in temporary
accommodation also increased significantly at the end of year as this was the beginning
of the pandemic and lockdown. 
During Year 3 once lockdown restrictions began to be lifted and allocations resumed we
were able to not only reduce numbers but times too. 
However, the external factors impact of Covid19 and then the cost of living crisis began
impacting both numbers and time and continue to do so.  The demand for our prevention
and homeless services began increasing in 2021/22 which in turn led to more requests
for temporary accommodation.   
2018/19 2019/20 2020/21 2021/22 2022/23
Prevent 1 Approaches  178 240 332 576* 455 
*this included 220 Covid19 Tenant Hardship Fund applications 
On top of this the supply of available homes began to reduce.  The cost of living crisis is a
likely reason for a reduction in tenancy terminations in WDC tenancies.  The table shows
the average pre Covid19, during and after: 
2018/19 2019/20 2020/21 2021/22 2022/23
No of terminations 752 654 475 586 477 
Page 189

Page 190

6 
It shows how levels remain very low.  Less people are moving into private rented and
homeownership.  This is likely linked to less people moving into home ownership due to
high mortgage rates. 
The number of new build completions are beginning to reduce, with no completions due
in 2023/24 which would assist to top up available lets. 
We have started to see a rise in larger families present in West Dunbartonshire Council
for homelessness assistance.  With very limited larger family home stock meaning
increased times spent in temporary accommodation and more children in homeless
services.  Although the demand for larger properties have been incorporated into new
builds development none will be ready until 2025.  We are also utilising our increased buy
back budget to focus on suitable larger family homes.  There are currently 11 x families
who require 4/5 bed size property and 6 also have medical needs. 
All of these factors have led to higher numbers in temporary accommodation and longer
times.  Demand has become so great for temporary accommodation that as a local
authority who prided itself on not requiring the use of bed and breakfast, we are now
having to use it to accommodate demand which has led to reporting breaches of
accommodation. 
Is your local authority on track for making the planned transition to rapid
rehousing? If not, what major factors are hindering progress?
During the first three years of the RRTP we were able to meet our reduced target times
and seen increased lets to households experiencing homelessness.  Unfortunately in
year 4 we were unable to meet our target and seen an increase in times.  Factors
highlighted in the above section demonstrate we do have an increased in demand, higher
numbers in temporary accommodation and an increase in times spent in temporary
accommodation.   
As a result, we have had to adjust the target for year 5 but look to improve on current
times. 
Below shows our demand into our homeless service prior to RRTP and to present which
shows the impact external factors are having: 
2018/2019 2019/2020 2020/2021 2021/2022 2022/2023
1038 1022 1053 1203 1202 
If things had remained as they were in the first two years in terms of demand and supply,
and there hadn’t been external factors impacting both then West Dunbartonshire Council
would be on track to a transition of rapid rehousing for those with no to low support
needs. 
We will continue to prevent homelessness as much as possible but current climate
means this becomes more difficult or reduces available housing options for some
households. It is hoped that prevention can assist to reduce demand, however the
decisions and consequences around the cost of living cannot all be mitigated by the
homeless services. 
There are other factors adding to the demand of available social lets. Competing
demands for those available and the reduction of available private lets. 
Page 190

Page 191

7 
The private rented sector, despite demand outstripping supply, is beginning to shrink. 
Many landlords are leaving the sector due to unintended consequences of legislation
brought in to assist with the cost of living crisis such as taxation and rent caps.   
We have also seen additional demands and pressures associated with a wide range of
humanitarian programmes, most recently including the Homes for Ukraine and Scotland
Super Sponsor Schemes.  The Homes for Ukraine was at a scale never seen in Scotland
which has exacerbated the demand for available affordable housing across Scotland,
which ultimately amplifies the demand for the shrinking social housing supply. 
Available supply of properties is a key element to enable rapid rehousing and current
factors are impacting this. 
Times properties are at void stage have been increasing which affects numbers available. 
Some of the issues that are affecting time is the lack of available contractors to carry out
work and issues recruiting internal staff due to high demands for tradespersons.  The
availability of materials or lack of has also led to delays.  Another significant issue is
delays with utilities meters. Some of the issues and months delays in resetting
meters/installing new meters, are all things which mean a new tenant cannot move in. 
This is a nationwide issue. 
CASE STUDY
Single male parent household presents in July 2021.  Made original offer in August 2021
but had to be withdrawn once new medical information provided meant no longer suitable
for the child.  It was then January 2022 before another offer was made due to the needs
of the household.  However, by end of April we are unable to provide a ready for let date
as ongoing meter issues despite the property being ready in January.  Therefore, a
decision was made to convert or “flip” current temporary accommodation to a permanent
tenancy due to multiple delays and limited stock to meet needs of the household. 
While external context continues to impact demand and supply it will continue to be a
challenge to achieve full rapid rehousing in the short term. 
Page 191

Page 192

8 
Details of funding recipient
Local authority West Dunbartonshire Council 
Reporting period 01/04/2022 to 31/03/2023
Reporting officer Claire Mckay 
Position Senior Housing Development Officer 
Date completed 24th August 2023 
Total RRTP funding
carried over from 2021-22 £36,392   
RRTP funding received for
2022-23 £238,000 
RRTP spend 2022-23 £485,159 
Total RRTP funding
carried over to 2023-24 £1,263 
Page 192

Page 193

9 
Housing First
Housing First
tenancies 
Provide a short brief overview of your
progress and any obstacles to
progression of Housing First in your
area. 
We achieved 15 housing first tenancies in Year 4
which is one above our target of 14.  This included
a homeless prevention case where a referral was
accepted to prevent a tenancy ending.
We also carried a further 4 into Year 5 of those who
have been assessed or waiting an offer.
This was not our original target in our plan for year
4, it was 37.  However, due the available funding
we were unable to expand the service any further
to staffing levels from 8 FTE therefore target was
reduced to 14.
As there has been no additional funding secured
we are unable to expand current staff levels which
impacts ability for further housing first tenancies. 
Only one RSL actively offers properties as housing
first tenancies.
Housing First partners 
Provide detail of all Housing First
partners who are supporting the
delivery of Housing First. 
We work with our colleagues in housing services
and some of our registered social landlords in the
area to provide the tenancies.
We work closely with our colleagues in finances
around community care grants to help furnish the
properties.
Bi-monthly we provide updates on our housing first
service to our Alcohol and Drug Partnership.
We have ongoing conversations with colleagues in
HSCP regarding funding.
Allocation spent on
Housing First 2022/23:
£
SG RRTP funding
Local authority
funding Other
238,000 153,109 
Impact of Housing
First:
Any evidence of the impact of
Housing First including
anonymised case studies where
appropriate 
At the end of year 4 we had created 64 tenancies in
total with 50 still active.  This was with 8 “step
downs” and 6 tenancies ending (4 deaths and 2
tenancy/neighbour issues). With only 6 tenancies
ended means we are achieving a 91% tenancy
sustainment rate.  This service has given the
opportunity for those who would previously not
taken or sustained a tenancy before.  This also
means there was no a housing solution for some
cases which have been opened for many years.
For some individuals it has led to addressing other
issues such as mental health or addictions which
wouldn’t have been possible otherwise.
CASE STUDY attached at end of template. 
Future spend planned
on this activity in
2023/24:  £ 
SG RRTP Funding Local Authority
funding Other
241,146 120,000 
Page 193

Page 194

10 
Future plans for
Housing First :
Provide detail of the future of
Housing First delivery in your local
area, including timescales and
progress towards Housing First
being the default option for people
with multiple and complex needs
experiencing homelessness.   
We will be reviewing our Housing First Service
including stakeholders and service user’s
consultation.
We will also be exploring the option of procuring
additional support from third sector to be able to
create more tenancies during Year 5.
We continue to have ongoing conversations with
HSCP partners about long term funding as
homeless services should not and cannot fully fund
the current service let alone expand it.
Understanding further demand but would want to
explore Housing First as a homeless prevention
tool rather than being a homeless solution which
would reduce numbers of new people entering the
homeless service.  To enable this as a default
option requires long-term funding from all partners. 
Housing First Case Study 
C is a single male in his fifties, with addictions spanning 20 years and several
homeless presentations. Was housed in 2016 under homeless priority.  However,
due to his addictions he had poor door management to the point he would allow
other alcohol and drug users in his property sometimes under duress.  Things
escalated to the point where C was assaulted in his own home where he had to stay
in hospital for a month.  On discharge C gave up his tenancy and returned to live
with family. 
Throughout his life he sought support for his dependency and receives support from
Community Addictions Team and been on a methadone programme but at times
also used illicit drugs too. 
In 2019 following the assault, C presented to homeless services again. At this point
Housing First was established therefore the case manager made a referral into the
service.  C was accepted into housing first with the following being identified as his
support needs; current homeless situation, long term addiction support; recovery and
relapse preventions; social isolation; exploitation; mental health and wellbeing;
positive door control. 
C secured a new tenancy late 2019 but the first 2 years remained chaotic in terms of
drugs use and still being exploited by peers.  However, after building trust with his
HF support worker access community-based support networks.  This allowed C to
begin to think about his own personal recovery.  C began to see positive changes. 
Unfortunately, C had another relapse but recognising this this time asked for more
help in form of respite.  Workers linked in and C was given respite for 3 months while
maintaining his tenancy.   
Fast forward to now, C now been abstinence for nearly 4 months of all drugs, he’s
involved with Scottish Drug Forum as a volunteer, is addressing all debts and now
has a positive door control.  He also recently fully decorated his property.
Page 194

Page 195

Temporary Accommodation Task & Finish Group
SG Response What it means for WDC
Mar-23 Jul-23
PRIORITY ONE
1
The Scottish Government must at a minimum adequately fund the
delivery of new social homes through the Affordable Housing Supply
Programme (AHSP) to meet a target of delivering 38,500 social homes
by 2026
We will invest at least £60 million through the Affordable Housing Supply
Programme in 2023-2024 to support a national acquisition plan.
WDC had an increase like all LAs to our
budget but this was in pipeline prior to the
response.
2
The Scottish Government should urgently introduce a large-scale
national acquisition policy and action plan to buy private sector
properties.
As above
3
Local authorities should assess and report to the Scottish Housing
Regulator (SHR) on whether their Rapid Rehousing Transition Plans
(RRTPs) and Housing Need and Demand Assessments are directly
informing and influencing their Strategic Housing Investment Plans
(SHIPs)
The Scottish Housing Regulator has commented that the recommended
reporting process is a substantial departure from its current functions and will
require further consideration. Nonetheless, the Regulator recognises that
temporary accommodation is the main issue that local authorities are grappling
with and is keen to support solutions.
If confirmed to go ahead this would require
reviewing both our RRTP and SHIP and self
evalutate, possible added to assuarnce
statements.
We have agreed with the Scottish Housing Regulator that it will take more of a
strategic overview when engaging with local authorities. To support this
process, the content of its structured conversations with local authorities will be
enhanced to obtain more intelligence about successful projects.
Depending on approach maybe required to
provide more information.
4
The Scottish Government should publish data annually on how long
households who are currently living in TA have been there
The team is also committed to meeting the needs of users as fully as possible
through standard outputs, which are reviewed regularly. In the most recent
annual publication, data tables were included to show the distribution of
households (with and without children) in temporary accommodation, by
length of time, for cases which had closed. This is available at both national
and local authority level.
As we report this quarterly in our returns this
shouldn’t have any additional impact other
than this being published nationally and
potentail more attention to this particular
area.  We gather the data monthly already
therefore if increased monitoring requested
no impact on WDC.The team will expand outputs to provide useful information for live
homelessness cases for the next annual homelessness publication. If more
granular detail is required, such as breakdowns of longer periods of time spent
in temporary accommodation, the team can provide bespoke analysis.
If taken forward this would require review of
our data gathering if further breakdown
needs to be provided.
5
The Scottish Government and local authorities should work
together to review how they could standardise and improve collection
and recording of data on people experiencing homelessness with
disabilities and/or support needs.
The Scottish Government homelessness statistics and analysis team has
started work on an extensive review of the homelessness data collections. A
number of topic groups have been arranged to discuss different data collection
areas and to determine a renewed set of content. The data review will also fully
explore the appropriateness and feasibility of collecting high quality information
on protected characteristics. The aim is for content to be agreed and finalised
by early 2025, to be followed by two years of implementation.
WDC take part in statistic user groups to
provide feedback and help shape reporting
going forward.  The intention is to make
changes/improvements therefore a review of
our data gathering will be reuired and
subsequent actions taken forward.
PRIORITY TWO
6
All local authorities should provide a Locality Profile outlining needs
and demands aligned to their RRTP and undertake refreshed
modelling on TA in their area.
Flipping - we will support social landlords to increase the frequency of this
practice. By the end of this year, we will have worked with COSLA, ALACHO
and the SFHA to develop national guidance to help maximise the impact of
effective stock management and to support good flipping practice.
Already operate flipping in WDC and have a
budget to allow for 30 per year.  Welcome
and further tools to help expand this option
where appropriate
7
The Scottish Government and COSLA should develop national
guidance on the tools available for local authorities to actively manage
housing stock in their area to ensure maximal use of stock.
Empty homes - We are working with COSLA to reduce empty home
ownership and have introduced financial disincentives, such as providing local
authorities with additional powers to charge council tax premiums on second
homes and higher premiums on long-term empty homes. Our consultation on
this approach recently closed, and we will announce next steps which will be
informed by responses to the consultation.
WDC already have a FTE empty homes
officer.  Awiting further steps and review our
processes as necessary but welcome any
further additional powers where no extra cost
to WDC or costs covered.
VOID management - Building on previous communication with the UK
Government, energy companies, Ofgem and Scottish Water, we will bring
utility companies round the table to identify ways to improve this situation.
Await any improvements in this area and
review processes as necessary
Allocations LA and RSLs - To help address regional disparity in allocations to
homeless households, we will develop a set of broad allocation parameters for
application at a national level, with specific detail to be agreed locally. These
tailored allocation policies will help meet the needs of the number of homeless
households locally and ensure any barriers to achieving this are understood
and addressed.
Need to await any further detail to assess
the impact.
Allocations - We will urge all local authorities to consider the case for
undertaking an appropriate level of increase for a specified period of time. 
Housing associations need to play an active part in supporting households
experiencing homelessness in their areas to access a settled home through a
short-term increase in allocations to homeless households.
WDC already liaise and ask our RSL to
match our allocations based on our RRTP
modelling, any further support increasing
may help where some have been slightly
more reluctant.
8
There should be a statutory requirement for each local authority area
to have a single common housing register and a single common
allocation policy to remove barriers for people in applying for social
housing and navigating the system.
As part of our engagement with social landlords, we will identify ways to
remove local barriers to establishing a common housing register appropriate to
each area. Given the different challenges across local authority areas, we
intend to pursue a non-statutory means of achieving this in the first instance.
WDC restarted conversations with our local
RSL's with a view to creating a CHR
PRIORITY THREE
9
he Scottish Government should publish a review of funding of
homelessness services, including any identified funding gaps and the
provision of continued funding for RRTPs and Prevention of
Homelessness. This should include a review of the funding model
for TA
It will be critical to agree with local government ways to ensure homelessness
funding is carefully targeted to increasing positive outcomes for households in
temporary accommodation. We will seek agreement on a shared approach to
funding arrangements for local authorities that will support the immediate aim
of reducing the use of temporary accommodation and support more effective
homelessness prevention and the transition to rapid rehousing by default.
Once new ways of working agreed will
requre will review of our own operation and
lead to any necessary changes.  WDC will
ensure any involvement in the review
process.
10
Following the review, action should be taken to make changes to the
funding of homelessness services to ensure they are funded
sufficiently.
Await any actions following the review.
11
COSLA and the Scottish Government should consider a focus on
how to address the recruitment and staffing crisis across the housing
sector.
We want to support local authorities’ efforts to avoid the risk of burnout and to
retain talented people in these crucial roles. To support local efforts to recruit
staff, we will work with the Chartered Institute of Housing to develop initiatives
that local authorities can use to help retain staff. We recognise short-term
funding awards affect staff retention and recruitment, both of which
subsequently impact on service delivery. We will explore the possibility of multi-
year funding within the current financial constraints.
WDC already exploring its own Housing
Academy but welcome any supports put in
place by Scottish Government surrounding
burnout.  WDC will also be able to have
more long term plans if multu year funding is
agreed.
12
Health and Social Care Integration Authorities should ensure that
Housing Contribution Statements detail what care and support
provisions are the responsibility of Health and Social Care
Partnerships and what are the responsibility of local authority housing
teams.
The recommendations made on health and social care also form part of our
longer-term approach. While we agree that Housing Contribution Statements
should be clear on where the responsibility for care and support provisions lie,
this is part of a much larger and longer-term piece of work to improve
community health and social care support in Scotland            By placing duties
on relevant public bodies, the responsibility to prevent homelessness becomes
a shared public responsibility and action to prevent homelessness starts much
earlier. We will work with public bodies in advance of the introduction of the
legislation to ensure they each play their part.
Awaiting further guidance when the bill is
laid in Parliament, although duty to other
public bodies has the potenial to impact
WDC homeless services with unseen
increase in demands to our housing options
service with potentially no further resources. 
Risk diluting in service we can offer.
A co-design approach with the public has been adopted to develop Scotland’s
National Care Service, which will include consideration of the way in which
social care and homelessness services work together. The process will provide
clarity on the roles and responsibilities of those involved in supporting people
at risk of or experiencing homelessness.
13
The Scottish Government should work with local authorities to
assess the current Community Care Grant process and make it faster
to overcome the delays it can cause in moving people out of TA.
Scottish welfare fund - The Scottish Government has developed an action plan
with local authorities and stakeholders, which sets out next steps on
improvements to processing timescales and assessment prioritisation.
Welcome any changes that help speed up
the process or supports priitisation which
can potenially help reduce move on time and
therefore ultimately numbers in temporary
accommodation
14
COSLA should undertake a benchmarking process on TA and there
should be greater transparency on charges of TA by individual local
authorities.
NO COMMENT OR MENTION IN RESPONSE
15
The Scottish Government should review the guidance to local
authorities on setting charges for TA by clearly defining the terms
"reasonable charge" and "affordable".
NO COMMENT OR MENTION IN RESPONSE
15 Reccommendations
ITEM 14 - APPENDIX 2
Page 195

Page 196

Page 196

Page 197

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Housing and Communities Committee: 22 November 2023
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 31 August 2023 (Period 05)
1. Purpose
1.1 The purpose of the report is to provide members with an update on the
financial performance to 31 August 2023 (Period 05) of the HRA revenue and
capital budgets for 2023/24.
2. Recommendations
2.1 Members are asked to :
i) note the revenue analysis shows projected adverse variances of
£2.309m; and
ii) note the net projected annual position in relation to the capital plan is
highlighting an in-year adverse variance of £63.776m (51.1%) which is
made up of re-profiling of £64.176m (51.4%) and overspend of £0.401m
(0.3%) as detailed in Appendix 4.
It should be noted that these are the financial projections as at Period 5 which
were reported to Council on 25 October 2023. Since they were produced the
Chief Officer for Housing and Employability, in conjunction with the Council’s
Chief Officer for Resources has progressed work to identify options to reduce
the projected revenue overspend. This work is still being progressed however
current indications are that there will be viable options to reduce the in year
overspend to the extent that no contribution from the General Fund will be
required.
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council on 01 March 2023, Members
agreed the revenue estimates for 2023/24 and a total budget of £49.643m.
Capital
3.2 At the meeting of Council on 01 March 2023, Members also agreed the
updated Capital Plan for 2023/24 which has been augmented by re-profiling
ITEM 15
Page 197

Page 198

and from 2022/23 and budget adjustment to produce a total planned spend for
2023/24 of £124.846m. 
4. Main Issues
Revenue 
4.1  The budgetary position for HRA Revenue is provided in Appendix 1 with
information on projected variances valued at more than £0.050m being
provided as Appendix 2.
4.2 The HRA revenue account has come under severe financial pressure in
2023/24. After applying all available HRA reserves, there remains a £2.309M
anticipated HRA revenue deficit in 2023/24. The Housing (Scotland) Act 1987
specifies that if an HRA deficit arises in any one year, the local authority must
make a contribution to make good the deficit from the General Fund. The HRA
would then be expected to repay that contribution from any future surpluses
generated. 
4.4 The main pressure areas are repairs and loan charges interest payments.
Repairs overspend has arisen due to several factors including inflationary
increases in materials and labour and large numbers of voids at start of
financial year. Void numbers have now significantly reduced therefore it is
expected costs will start to reduce in this area in the coming years. Also the
efficiency of the work carried will continue to be assessed with a view to
minimising the costs of repairs through improved productivity. The recent large
increases in interest rates has led to a substantial increase in interest
payments for loans outstanding.
Capital
4.5 The HRA capital summary position is shown in Appendix 3. Information on
projects that are highlighted as being within the Red category is provided in
Appendix 4 and Appendix 5 provides information on the projects at Green.  A
summary of anticipated resources is shown in Appendix 6. The analysis
shows that there is currently a projected in-year adverse variance of
£63.776m (51.1%), which is made up of re-profiling of £64.176m (51.4%) and
overspend of £0.401m (0.3%).
4.6 From the analysis within the appendices it can be seen that the main project
with forecast material re- profiling being required is:
Project Name Re-profiling
(£m)
Affordable Housing Supply Programme 62.682
Reasons/ factors for needing re – profiling in respect of each new build site for
slippage are explained in Appendix 4, project 8
Page 198

Page 199

5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year.  This can
affect all service areas.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Housing management and Legal services have been
requested on this report and both have advised there are neither any issues
nor concerns with the proposal.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer – Resources
Date: 26 October 2023
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner (HEED),
16 Church Street, Dumbarton, G82 1QL,
Page 3Page 199

Page 200

Telephone: 01389 737704, e-mail janice.rainey@west-
dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue) 
Appendix 3 - Budgetary Position (Capital)
Appendix 4 - Variance analysis Red (Capital)
Appendix 5 - Variance analysis Green Projects (Capital)
Appendix 6 - Resources (Capital)
Appendix 7 - Analysis of Affordable Housing Supply 
Programme (Capital)
Background Papers: None
Wards Affected: All
Page 200

Page 201

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2023/24
PERIOD END DATE
Subjective Summary
Total Budget
2023/24 
£000
Spend to
Date
2023/24 
£000
Forecast
Spend
£000
Annual RAG
Status
Employee Costs 7,669 2,698 7,961 292 4% 
Property Costs 2,377 713 2,084 (293) -12% 
Transport Costs 142 36 138 (4) 0% 
Supplies, Services And Admin 389 92 397 8 2% 
Support Services 2,720 1,084 2,603 (117) -4% 
Other Expenditure 534 330 485 (49) -9% 
Repairs & Maintenance 16,257 6,579 19,797 3,540 22% 
Bad Debt Provision 1,089 31 960 (129) -12% 
Void Loss (Council Tax/Lost Rents) 1,261 606 1,454 193 15% 
Loan Charges 15,476 7,911 18,829 3,353 22% 
CFCR 1,729 0 0 (1,729) -100% 
Total Expenditure 49,643 20,080 54,708 5,065 10% 
House Rents 47,729 15,483 47,671 58 0% 
Lockup Rents 217 65 202 15 7% 
Factoring/Insurance Charges 1,434 1,495 1,495 (61) -4% 
Other rents 117 35 120 (3) -3% 
Interest on Revenue Balance 30 0 146 (116) -387% 
Transfer from Reserves 0 0 2,634 (2,634) 0% 
Miscellaneous income 116 36 131 (15) -13% 
Total Income 49,643 17,114 52,399 (2,756) -6% 
Net Expenditure 0 2,966 2,309 2,309 
Forecast Variance 2023/24
£000               %
31/08/2023
ITEM 15 - APPENDIX 1
Page 201

Page 202

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31/08/2023
PERIOD 5
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
EMPLOYEE COSTS 7,669 7,961 292 4% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
PROPERTY COSTS 2,377 2,084 (293) -12% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPORT SERVICES 2,720 2,603 (117) -4% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
REPAIRS & MAINTENANCE 16,257 19,797 3,540 22% 
Main Issues
Mitigating Action
Anticipated Outcome
Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers electricity, gas, rates, rents, cleaning  and insurance costs.
Variance Narrative
A favourable variance is expected due to the assumption that office accommodation and
utility costs will be similar to last year which is lower than anticipated at time of budget
setting, resulting in a favourable variance.
A year end underspend is anticipated
Managers will continue to consider ways to keep staffing costs down including considering
each vacancy as it arises re need / urgency to fill.
High volume of jobs and  inflationary increases in materials and labour have resulted in the
budget being insufficient to meet current demand.  There was a large numbers of voids at
start of financial year.  Void numbers have now significantly reduced therefore it is expected
costs will start to reduce in this area.
Variance Narrative
Variance Narrative
This budget covers all repair and maintenance expenditure to houses and lockups
Subjective Description
A year end underspend is anticipated
A year end overspend is anticipated
There are uncontrollable costs, such as materials and inflation as well as the demand for
repairs which continues to increase.  However as we continue to progress with the building
services improvement plan, we expect costs to reduce particularly in relation to void houses.
Budget Details
A year end overspend is anticipated
This budget covers central support recharges to the HRA
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
This adverse variance is mainly due to additional posts being approved, after time of budget
setting to meet the demands of the service. In addition to this , the pay award for 2324 is
exected to be higher than the budgeted 4%.
A favourable variance is expected with the assumption that the 2023/24 forecast outturn for
support services is expected  to be in line with the 2022/23 outturn adjusted for pay uplifts
etc. This charge is calculated each year end based on HRA's percentage usage of the total
cost of WDC support services. The 2023/24 HRA budget was set before this 2022/23
outturn was known so was based on 2021/22 charge which was higher.
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Budget Details Variance Analysis
Subjective Analysis forecast Variance
ITEM 15 - APPENDIX 2
Page 202

Page 203

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31/08/2023
PERIOD 5
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
BAD DEBT PROVISION 1,089 960 (129) -12% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
VOID LOSS 1,261 1,454 193 15% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
LOAN CHARGES 15,476 18,829 3,353 22% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
CFCR 1,729 0 (1,729) -100% 
Main Issues
Mitigating Action
Anticipated Outcome
A year end overspend is anticipated
Subjective Analysis forecast Variance
Service Description
Loan Charges is made up of repayments of principle sums, and the payments of interest and expenses
A void working group has been reviewing the issues and have been implementing actions
and working with Housing Maintenance managers to improve the situation and it is expected
that the void figures will continue to decrease  over the next few months.
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
Variance Narrative
The main reason for this variance is the due to interest payments being higher than
anticipated at time of budget setting. The recent increase in bank interest rates has to led to
a significant increase in loan interest payments.
None available
A year end underspend is anticipated
Service Description
This budget covers the contribution from revenue to Capital
Variance Narrative
In order to offset the cost pressures on the revenue HRA in 2023/24 , it is anticpated that
there will be no contribution to captal spend in 2023/24.
None available
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Budget Details Variance Analysis
A year end overspend is anticipated
Subjective Analysis forecast Variance
A year end underspend is anticipated
Variance Narrative
The Bad Debt Provision expected to be required for 2023/24 is less than estimated at time
of budget setting, resulting in a favourable variance. This assumes that the provision
required in 2023/24  will be similar to the 2022/23 provision.
Variance Narrative
The main reason for the projected adverse variance relates to the number of void properties
being higher than expected at time of budget setting.  The budget was set on the
assumption that backlogs following COVID delays  in getting voids turned around would be
resolved  however the  numbers continued to be high at the beginning of this financial year.
They have now lowered considerably
Budget Details Variance Analysis
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Page 203

Page 204

WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 5
Spend to
Date Spend to Date
£000 £000
Red
8 26.7% 11,281 69.2% 8 26.7% 11,281 69.2%
Green
22 73.3% 5,027 30.8% 22 73.3% 5,027 30.8%
30 100% 16,308 100% 30 100% 16,308 100%
Budget Spend to
Date
Forecast
Spend Forecast Variance Budget Spend to Date Forecast
Spend
Forecast
Variance Reprofiled Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
252,401 11,281 256,056 3,655 99,783 11,281 38,588 (61,195) (65,128) 3,933
114,328 5,027 110,795 (3,532) 25,063 5,027 22,482 (2,581) 952 (3,532)
366,729 16,308 366,851 124 124,846 16,308 61,070 (63,776) (64,176) 401
366,729 16,308 366,851 (124) 124,846 16,308 61,070 63,776
0 0 0 0 0 0 0 0
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Green
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 August 2023
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at RAG
Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Green
ITEM 15 -
APPENDIX  3
Page 204

Page 205

WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,814 219 8% 3,074 260 9%
Current Year Financials 525 219 42% 785 260 50%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
2
Project Life Financials 10,000 0 0% 10,000 0 0%
Current Year Financials 2,000 0 0% 1,000 (1,000) -50%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
3
Project Life Financials 32,986 1,667 5% 32,986 0 0%
Current Year Financials 6,146 1,667 27% 4,725 (1,421) -23%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
4
Project Life Financials 242 0 0% 242 0 0%
Current Year Financials 45 0 0% 21 (24) -54%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
Capitalised minor works
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Budget is expected to overspend due to costs and demand for budget being higher than anticipated at time of budget setting.
Mitigating Action
Officers in discussion to identify possible mitigation.
Anticipated Outcome
Project to complete over budget.
Environmental Sensors Programme 
Environmental sensors programme, funded by enhanced housing investment programme 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Project introduced as part of the enhanced capital programme, with aim to install an environmental sensor in every Council owned property. 
Council hopes to provide a supply and fit contractor at the Tendering Committee in October 2023.  Officers anticipate the programme to
commence before the end of 2023 targetting priority addresses identified.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Targeted SHQS /EESSH compliance works
This budget is to focus on work required to maintain the SHQS compliance and energy efficiency  with
WDC housing stock.   
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works progressing well, however some rephasing may be required to 24/25.
Mitigating Action
None available at this time
Anticipated Outcome
Full budget spend over project life
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and recommended from
the housing stock condition survey and appropriate council officer referrals. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
This programme always presents challenges with owner liaison and reaching agreements to install door entry where none exists, this
contributes directly to achieving SHQS compliance for this element.  Any underspend in current year will be carried forward to future years.
Mitigating Action
Officers continue to liaise with owners to encourage agreement for install.
Anticipated Outcome
It is likely that this will not to meet full spend in the current year despite best efforts but officers will endeavour to gain owners agreement.
ITEM 15 -
APPENDIX 4
Page 205

Page 206

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 9,872 518 5% 10,399 527 5%
Current Year Financials 1,840 518 28% 2,367 527 29%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
6
Project Life Financials 13,900 1,505 11% 16,691 2,791 20%
Current Year Financials 3,000 1,505 50% 5,791 2,791 93%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
7
Project Life Financials 5,454 723 13% 5,454 0 0%
Current Year Financials 1,017 723 71% 1,295 278 27%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Demand has exceeded expectations.  Due to the nature of this project (ensuring heating and hot water availbility) there is no option for a
conscious reduction of installs.
Mitigating Action
Whilst demand is leading spend, officers will work to minimise any budget overspend.
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition survey and
renewal of obsolete/damaged boilers. 
Anticipated Outcome
Full budget spend, likely overspend.
Void house strategy programme
Spend on Void Properties to bring them up to letting standard 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Void works to continue into 23/24 to bring void properties up to a lettable standard.  Based on current projections using updated anticipated
numbers it looks likely that the budget will be insufficient , resulting in a projected overspend in 23/24. 
Mitigating Action
This is a significant priority and we continue to make positive progress against internal plan and targets to reduce the number of void
houses.  We expect this to continue to reduce.
Anticipated Outcome
The cost of bringing void properties up to lettable standard will result in a overspend.
Main Issues / Reason for Variance
Work progressing well and ahead of spend targets, at this pace likely to exceed budget to meet tenant demand. Officers currenty working to
manage workload and prioritise to minimise overspend.
Mitigating Action
Officers currenty working to manage workload and prioritise to minimise overspend.
Anticipated Outcome
Full budget spend, likley to overspend.
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas 
Planned End Date  Forecast End Date
Page 206

Page 207

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
8
Project Life Financials 177,132 6,650 4% 177,209 77 0%
Current Year Financials 85,209 6,650 8% 22,604 (62,605) -73%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Variance to
22/23 Budget
Site/ Spend £000  Overspend   Underspend  Reprofiling
Haldane Primary School 77 77
Clydebank East (19,566) (19,566)
Queens Quay Site C (7,425) (7,425)
Pappert (10,193) (10,193)
Bank Street (3,508) (3,508)
Clydebank Health Centre (3,858) (3,858)
Willox Park Phase1 (5,022) (5,022)
Mount Pleasant (7,717) (7,717)
Gap sites (5,393) (5,393)
TOTAL OF ALL PROJECTS (62,605) 77 0 (62,682)
Variance Category
Haldane - Site complete, retention paid in 2023/24
Forecast End Date
Main Issues / Reason for Variance
The £62.605m variance is made up of £0.077m overspend, and reprofiling of £62.682m into 2024/25 onwards . Summary of reprofiled sites
together with site specific updates as follows:-
Clydebank East - 88 units to be completed by March 2025.  Project delivery reprofiled due to extensive groundworks. Project on site and
programme adhering to amended delivery plan.
Queens Quay Site B - 29 units completed on site in 2022/23.  Project completed, retention figure included and associated costs in terms
with road construction.
Queens Quay Site C - 20 units to be completed on site, however no further progress due to land owner issue.  At the time it is assumed
approximately £2m will be spent on land purchase, with the remaining current year budget to be reprofiled to 2024/25.
Pappert - 26 units to be completed on site by April 2025.  Planning delay negated anticipated spend profile for 2023/24, however Planning
approval received 20 September 2023 and site start in early 2024 planned.
Bank Street - 22 units to be completed on site.  Spend reprofiled from 2023/24 to 2024/25 as design team procurement was delayed. 
Projected spend in 2023/24 will be design and statutory fees.
Affordable Supply Programme
Affordable Housing Supply Programme 
Planned End Date
Page 207

Page 208

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
TOTAL OF RED PROJECTS
Project Life Financials 252,401 11,281 4% 256,056 3,655 1%
Current Year Financials 99,783 11,281 11% 38,588 (61,195) -61%
Clydebank Health Centre - Demolitions planned for 2023/24, Design and Build development and contractors will be procured also  this year,
however physical site start will not be achieved until 2024/25.
Mount Pleasant -19 units to be completed on site by March 2025.  Demolition now complete and contractor award appointment made in
September.  £1m estimated to be spent this financial year with remaining current year budget to be reprofiled to 2024/25 for site start in
March 2024.
Bonhill Gap Site - Spend reprofiled from 2023/24 to 2024/25 as design team procurement was delayed.  Projected spend in 2023/24 will be
design and statutory fees.
Mitigating Action
Staff will work closely with all stakeholders to try and ensure timely resolutions of issues as they arise.
Anticipated Outcome
Project will still complete and will meet revised spend profiles .
Willox Park Phase1 - 17 units to be completed on site.   Spend reprofiled from 2023/24 to 2024/25 as design team procurement was
delayed.  Projected spend in 2023/24 will be design and statutory fees.
Page 208

Page 209

WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 3,216 223 7% 3,216 0 0%
Current Year Financials 600 223 37% 600 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
2
Project Life Financials 1,493 0 0% 1,493 0 0%
Current Year Financials 529 0 0% 529 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
3
Project Life Financials 750 0 0% 750 0 0%
Current Year Financials 250 0 0% 250 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-25
4
Project Life Financials 203 0 0% 203 0 0%
Current Year Financials 116 0 0% 116 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Mitigating Action
None required
Anticipated Outcome
Full budget spend
QL Development
This budget relates to the costs associated with the development of the Integrated Housing
Management System 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No issues. Development of QL system to carry on through 23/24.
Main Issues / Reason for Variance
Works to progress as part of enhanced capital programme for 23/24 and to be led by Council CCTV team.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Housing CCTV Installation Programme
CCTV Installation Programme, funded by enhanced housing investment programme 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
A number of priority initiatives, supported by the Better Homes Project Board,  are being investigated and are envisaged to have a
positive impact on the current council housing stock and budget, with works expected to progress in 23/24.
None required
Anticipated Outcome
Full budget spend
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
Special needs adaptations
ITEM 15 -
APPENDIX 5
Page 209

Page 210

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 209 0 0% 209 0 0%
Current Year Financials 71 0 0% 71 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
6
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
7
Project Life Financials 36 36 99% 36 (1) -1%
Current Year Financials 36 36 99% 36 (1) -1%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Redployable CCTV Cameras
Purchase of 5 redeployable CCTV cameras for Housing use 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works for this project complete in April 23/24.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
Community Safety Projects
Community Safety Projects 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, programme being progressed andanticipated to meet full spend and targets.
Mitigating Action
None required
Gypsy Travellers Site
Gypsy/ Traveller Site improvements
Page 210

Page 211

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
8
Project Life Financials 96 0 0% 96 0 0%
Current Year Financials 96 0 0% 96 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
9
Project Life Financials 19,286 287 1% 16,310 (2,976) -15%
Current Year Financials 5,679 287 5% 2,703 (2,976) -52%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
10
Project Life Financials 17,937 1,307 7% 17,937 0 0%
Current Year Financials 4,547 1,307 29% 4,965 418 9%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Project is progressing well in 23/24 and as a result may incur an overspend in the current year, with budget brought forward from
future years to offset.
Mitigating Action
None required at this time
Mitigating Action
None required
Anticipated Outcome
Scheduled works to complete under current year budget.
Doors/window component renewals
Doors/Windows Component Renewals
Roof Coverings
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works expected to meet revised timescales which will be less than current year budget and therefore project will report an in year
underspend.
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
West Dunbartonshire Council are no longer eligible for match funding from Glasgow Airport Association, following assessment of
properties within West Dunbartonshire.  West Dunbartonshire is not deemed to have any commercial or residential properties that
fall within the scope of the scheme to be eligible for match funding, and budget therefore has been reduced from £0.192m to
£0.096m.  The remaining budget will be used to develop a programme of works following engagement with an aircraft noise
consultant, who will work with Officers to make adaptations to previously identified properties.  Budget spend anticipated in 23/24.
Mitigating Action
None required
Airport Noise
Noise Insulation Project
Page 211

Page 212

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
11
Project Life Financials 6,400 0 0% 6,400 0 0%
Current Year Financials 0 0 #DIV/0! 0 0 #DIV/0!
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
12
Project Life Financials 242 61 25% 242 0 0%
Current Year Financials 45 61 135% 42 (3) -7%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
13
Project Life Financials 606 2 0% 606 0 0%
Current Year Financials 113 2 2% 105 (8) -7%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
14
Project Life Financials 303 0 0% 303 0 0%
Current Year Financials 57 0 0% 57 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught
exclusion)
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets, with possible underspend to be carried forward to future years.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply with
the relevant standards / legislation / health and safety in relation to housing stock. 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as
identified and recommended from the housing stock condition survey. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets, with possible underspend to be carried forward to future years.
Main Issues / Reason for Variance
Works expected to commence next financial year, therefore no Issues to report at this time.  Project anticipated to meet full spend
and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
District Heating 
District Heating Connection to the Dalmuir and Littleholm multi storey flats 
Planned End Date  Forecast End Date
Page 212

Page 213

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
15
Project Life Financials 17,775 1,124 6% 17,775 0 0%
Current Year Financials 3,235 1,124 35% 3,780 545 17%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
16
Project Life Financials 103 0 0% 103 0 0%
Current Year Financials 103 0 0% 103 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
17
Project Life Financials 500 0 0% 500 0 0%
Current Year Financials 100 0 0% 100 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
18
Project Life Financials 3,835 724 19% 3,279 (556) -15%
Current Year Financials 877 724 83% 321 (556) -63%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Mitigating Action
None required
Anticipated Outcome
Scheduled works to complete under current year budget.
Defective structures/component renewals
Defective structures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works expected to meet revised timescales which will be less than current year budget and therefore project will report an in year
underspend.
Main Issues / Reason for Variance
Contingent budget held for unplanned spend.
Mitigating Action
None required
Anticipated Outcome
Spend as required
Contingencies
This is a contingent budget for unforeseen matters which may arise during the year. 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Improvement works (Risk St)
Risk Street Over clad 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Main Issues / Reason for Variance
Pace of installations are ahead of targets as increased budget was anticipated. Officers will work to manage outturn to revised
budget and targets with likelihood of exceeding budget as demand and cost is higher than projected.
Mitigating Action
Officers will work to minimise any overspend whilst being mindful of tenant demand
Anticipated Outcome
Full budget spend, possibility of overspend.
Modern facilities and services
New Kitchens, Bathrooms and Showers 
Planned End Date  Forecast End Date
Page 213

Page 214

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
19
Project Life Financials 1,212 38 3% 1,212 0 0%
Current Year Financials 226 38 17% 226 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
20
Project Life Financials 5,050 0 0% 5,050 0 0%
Current Year Financials 1,300 0 0% 1,300 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
21
Project Life Financials 21,073 1,225 6% 21,073 0 0%
Current Year Financials 4,435 1,225 28% 4,435 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
22
Project Life Financials 13,984 0 0% 13,984 0 0%
Current Year Financials 2,629 0 0% 2,629 0 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
TOTAL OF RED PROJECTS
Project Life Financials 114,328 5,027 4% 110,795 (3,533) -3%
Current Year Financials 25,063 5,027 20% 22,482 (2,581) -10%
Main Issues / Reason for Variance
No Issues, budget for salaries and support
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Salaries/central support/offices
Allocation of costs from other WDC services who support the HRA capital programme 
Planned End Date  Forecast End Date
Anticipated Outcome
Budget spend anticipated, should criteria be met.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme, back
into council use.  These properties must assist the council with reducing housing need on the waiting list and where appropriate
assist with external capital works.  From 23/24, over 5 years, the buy back back scheme is benefiting from an additional £2m
investment each year, included in this revised budget, totaling £10m over 5 years, to futher reduce the waiting list.  The progress
will be monitored and reported as the financial year progresses.
Mitigating Action
None required.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme
Multi Story Flats  ( including Fire Risk Assessment Works)
High Rise Fire Safety Measures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet spend and revised targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Asbestos management works
This budget is to fund work associated with the management of current asbestos legislation and 
Planned End Date  Forecast End Date
Page 214

Page 215

WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (46,875) (585) 1% (46,875) 0 0%
Current Year Financials (28,055) (585) 2% (7,442) 20,613 -73%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
2
Project Life Financials (8,646) (432) 5% (6,917) 1,729 -20%
Current Year Financials (1,729) (432) 25% 0 1,729 -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
3
Project Life Financials (311,208) (10,567) 3% (269,773) 41,435 -13%
Current Year Financials (94,267) (10,567) 11% (53,627) 40,640 -43%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
TOTAL RESOURCES
Project Life Financials (366,729) (11,584) 3% (323,565) 43,163 -12%
Current Year Financials (124,051) (11,584) 9% (61,070) 62,981 -51%
Prudential borrowing incurred as required
None required
Anticipated Outcome
Income to Capital
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved
for the purposes of funding capital expenditure
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery.
Mitigating Action
None available at this time.
Anticipated Outcome
Mitigating Action
Income due to be received in line with spend incurred.
Mitigating Action
None required
Anticipated Outcome
Income due to be received
CFCR
This is capital spend which is funded by revenue budgets
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Contribution to Capital from Revenue in 23/24
Main Issues / Reason for Variance
31 August 2023
Budget Details Project Life Financials
Spend to Date Variance
New Build Grant
Grant to facilitate the building of new build housing 
Planned End Date  Forecast End Date
ITEM 15 -
APPENDIX 6
Page 215

Page 216

WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF AFFORDABLE HOUSING SUPPLY PROGRAMME
MONTH END DATE
PERIOD 5
Budget Spend to Date Forecast Spend
£000 £000 £000 £000 %
RAG
Status
Haldane Primary School - 77 77 77 #DIV/0! 
Clydebank East 37,992 5,903 37,992 - 0% 
Queens Quay Site B 660 0 660 - 0% 
Queens Quay Site C 25,175 - 25,175 - 0% 
Pappert 13,276 14 13,276 - 0% 
Bank Street 5,751 - 5,751 - 0% 
Clydebank Health Centre 11,016 591 11,016 - 0% 
Willox Park Phase1 6,185 37 6,185 - 0% 
Willox Park Phase2 7,500 - 7,500 - 0% 
Mount Pleasant 8,717 5 8,717 - 0% 
Silverton 2,590 4 2,590 - 0% 
Gap sites
Gap sites budget remaining 9,182 - 9,182 - 0% 
Bonhill Gap Site - all Bonhill Sites 245 0 245 - 0% 
Clydebank Gap Sites ( prev Lilac Avenue) - unallocated 13,622 - 13,622 - 0% 
Clydebank Gap Sites ( prev Lilac Avenue) - 7-9 Gilmour Avenue 50 11 50 - 0% 
Clydebank Gap Sites ( prev Lilac Avenue) - Queen Mary Avenue 50 7 50 - 0% 
Future New build sites 27,000 - 27,000 - 0% 
28 Bridge Street Alexandria 23 - 23 - 0% 
Fees, Staffing Costs, contingency 8,097 - 8,097 - 0% 
Total Expenditure 177,132 6,650 177,209 77 
31 August 2023
Site
Project Life Financials
Variance
ITEM 15 -
APPENDIX 7
Page 216

Page 217

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources
Housing and Communities Committee: 22 November 2023
___________________________________________________________________
Subject:  General Fund Housing and Communities Financial Report 2023/24
as at Period 5 (31 August 2023)
1. Purpose
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 31 August 2023 (Period 5) of General Fund services
under the auspices of the Housing and Communities Committee.
2. Recommendations
2.1 Members are asked to:
i) note the contents of this report which shows the revenue budget forecast
to overspend against budget by £0.070m(2.1%) at the year end.
ii) note the net projected annual position in relation to relevant capital
projects which is showing no projected variance; and
iii) note the progress on efficiencies incorporated into budgets for 2023/24.
3. Background
3.1      Revenue Budget
At the meeting of West Dunbartonshire Council on 01 March 2023, Members
agreed the revenue estimates for 2023/24.
A total net budget of £3.303m was approved for services under the remit for
Housing and Communities services at that time.
Capital
3.2 At the meeting of Council on 01 March 2023, Members also agreed the
updated 10 year General Services Capital Plan for 2023/2024 to 2032/33.
The next three years from 2023/24 to 2025/26 have been approved in detail
with the remaining 7 years being indicative at this stage. The total project life
budget approved for projects that have either commenced or are due to
commence in that period total for Housing and Communities services was
£0.006m.
ITEM 16
Page 217

Page 218

4. Main Issues 
Revenue Budget
4.2 Appendix 1 shows the probable outturn for the services at £3.373m. As the
annual budget is £3.303m there is a projected adverse variance currently
projected of £0.070m. A more detailed analysis by service is given in
Appendix 2. Comments are shown in Appendix 3 when there are projected net
annual variances greater than £0.050m and also where the net variance is
below £0.050m but there are offsetting variances of over £0.050m within the
service. Appendix 4 shows progress on the achievement of saving options
adopted as part of the 2023/24 budget. 
It should be noted that £0.191m of the Council’s smoothing fund has been
allocated to Communities to offset the reduced savings now expected due to
delay in savings around restructure implementation .The figures in this report
reflect this allocation and therefore there is no adverse variance required to be
shown in Communities since it is covered by this offsetting allocation. 
Capital Budget
4.3 The overall programme summary report is shown in Appendix 5. The analysis
shows that for the in-year planned spend there is currently no projected
variance. 
5. People Implications 
5.1 There are no people implications. 
6. Financial Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. 
6.2      Agreed efficiencies for 2023/24 are monitored with current indications being
that £1.895m of the savings budgeted of £2.086m will be achieved (see
Appendix 4). As noted in 4.2 above, the smoothing fund will be used to offset
this £0.191m shortfall. 
7. Risk Analysis 
7.1 The present variances should be viewed in the knowledge that there are a
number of variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets.  
7.2  Assumptions around service demand and timing of nationally agreed changes
through the phasing out of lockdown change regularly and therefore there is a
significant risk that the projected year end budgetary position will change from
that reported.   
Page 218

Page 219

8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 The views of both Finance and Legal services have been requested on this
report and both have advised there are neither any issues nor concerns with
the proposal. As the report is for noting no further consultation is envisaged. 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities. 
Laurence Slavin
Chief Officer, Resources                       
Date: 26 October 2023
___________________________________________________________________ 
Person to Contact:  Janice Rainey - Business Unit Finance Partner, 16
Church Street, Dumbarton, G82 1QL, telephone: 01389
737707, e-mail janice.rainey@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Summary Budgetary Position (Revenue)    
Appendix 2 - Detailed Budgetary Position (Revenue)    
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Efficiencies/Savings Options
(Revenue)    
Appendix 5 - Budgetary Position (Capital)    
Appendix 6 - Variance Analysis Green (Capital) 
Background Papers: None 
Wards Affected:  All 
Page 219

Page 220

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2023/24
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 31 August 2023
Actual
Outturn
2022/23
Total Budget
2023/24
YTD Spend
2023/24
Forecast
Spend
2023/24
Annual
RAG
Status
£000 £000 £000 £000 £000 %
3,126 2,238 1,134 2,205 (33) -1% 
1,007 917 570 917 0 0% 
826 482 904 681 199 41% 
44 18 8 18 0 0% 
64 Private Sector Housing Grant 81 0 83 2 2% 
322 392 117 365 (27) -7% 
0 Housing Asset and Investment 50 0 0 (50) -100% 
(454) (875) (625) (896) (21) -2% 
4,935 3,303 2,107 3,373 70 2.12% 
Service / Subjective Summary Annual Variance 2023/24
Communities
Homeless Persons
Private Sector Housing
Anti Social Behaviour
Housing Maintenance Trading A/c
Total Net Expenditure
Working 4 U/ UK shared Prosperity
ITEM 16 - APPENDIX 1
Page 220

Page 221

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2023/24
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 August 2023
PERIOD 5
Actual Outturn
2022/23 Service Summary
Total
Budget
2023/24
YTD Spend
2023/24
Forecast
Spend
2023/24
RAG Status
£000 £000 £000 £000 £000 %
22,781 Employee 21,741 8,105 21,704 (38) 0% 
2,469 Property 2,355 824 2,511 156 7% 
1,258 Transport and Plant 1,264 523 1,260 (5) 0% 
7,660 Supplies, Services and Admin 6,274 2,590 6,484 211 3% 
5,141 Payments to Other Bodies 5,312 1,585 5,350 38 1% 
209 Other 0 0 0 0 0% 
39,517 Gross Expenditure 36,947 13,627 37,309 363 1% 
(34,582) Income (33,644) (11,520) (33,936) (292) -1% 
4,935 Net Expenditure 3,303 2,107 3,373 72 2% 
£000 £000  £000  £000  £000 %
3,083 Employee 3,590 1,016 3,566 (24) -1% 
0 Property 0 0 0 0 0% 
14 Transport and Plant 13 4 13 0 1% 
191 Supplies, Services and Admin 53 50 56 3 6% 
2,566 Payments to Other Bodies 2,813 415 2,801 (12) 0%

250 Other 0 0 0 0 0% 
6,104 Gross Expenditure 6,469         1,485         6,437 (32) -1% 
(2,978) Income (4,231) (351) (4,231) 0 0% 
3,126 Net Expenditure 2,238         1,134         2,205 (32) -1% 
£000 £000  £000  £000  £000 %
963 Employee 927 449 927 0 0% 
70 Property 17 0 17 0 0% 
8 Transport and Plant 4 1 7 2 45% 
9 Supplies, Services and Admin 106 30 115 10 9% 
146 Payments to Other Bodies 246 141 243 (4) -2% 
0 Other 0 0 0 0 0% 
1,197 Gross Expenditure 1,300         621 1,309 9 1% 
(190) Income (384) (51) (392) (8) -2% 
1,007 Net Expenditure 917 570 917 0 0% 
£000 £000 £000 £000 £000 %
2,793 Employee 2,951 1,243 2,984 32 1% 
2,075 Property 1,924 744 2,079 156 8% 
37 Transport and Plant 31 11 25 (5) -16% 
121 Supplies, Services and Admin 71 43 99 28 39% 
1,100 Payments to Other Bodies 882 574 960 78 9% 
0 Other 0 0 0 0 0% 
6,126 Gross Expenditure 5,859 2,615 6,148 289 5% 
(5,300) Income (5,378) (1,711) (5,468) (90) -2% 
826 Net Expenditure 482 904 680 199 41% 
£000 £000 £000 £000 £000 %
0 Employee 0 0 0 0 0% 
0 Property 0 0 0 0 0% 
0 Transport and Plant 0 0 0 0 0% 
26 Supplies, Services and Admin 0 0 0 0 0% 
18 Payments to Other Bodies 18 8 18 0 0% 
0 Other 0 0 0 0 0% 
44 Gross Expenditure 18 8 18 0 0% 
0 Income 0 0 0 0 0% 
44 Net Expenditure 18 8 18 0 0% 
Private Sector Housing
Annual Variance
2023/24
All Services
Working 4 U/ UK shared Prosperity
Communities
Homeless Persons
ITEM 16 -
APPENDIX 2
Page 221

Page 222

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2023/24
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 August 2023
PERIOD 5
Actual Outturn
2022/23 Service Summary
Total
Budget
2023/24
YTD Spend
2023/24
Forecast
Spend
2023/24
RAG Status Annual Variance
2023/24
£000 £000 £000 £000 £000 %
42 Employee 42 17 43 2 5% 
223 Property 241 0 241 0 0% 
0 Transport and Plant 0 0 0 0 0% 
(0) Supplies, Services and Admin 0 0 0 0 0% 
246 Payments to Other Bodies 245 59 245 0 0% 
0 Other 0 0 0 0 0% 
510 Gross Expenditure 527 76 529 2 0% 
(446) Income (446) (76) (446) 0 0% 
64 Net Expenditure 81 0 83 2 2% 
£000 £000 £000 £000 £000 %
341 Employee 309 125 309 0 0% 
0 Property 69 36 69 0 0% 
9 Transport and Plant 0 0 0 0 0% 
3 Supplies, Services and Admin 0 0 0 0 0% 
141 Payments to Other Bodies 178 0 153 (24) -14% 
0 Other 0 0 0 0 0% 
494 Gross Expenditure 556 160 531 (25) -4% 
(173) Income (163) (43) (166) (3) -2% 
322 Net Expenditure 392 117 365 (27) -7% 
………………………………………………………………………………………………………………………………………………………………………………………….
£000 £000 £000 £000 £000 %
339 Employee 457 143 409 (48) -11% 
0 Property 0 0 0 0 0% 
3 Transport and Plant 5 1 3 (2) -40% 
0 Supplies, Services and Admin 0 0 0 0 0% 
0 Payments to Other Bodies 0 0 0 0 0% 
0 Other 0 0 0 0 0% 
342 Gross Expenditure 462 144 412 (50) -11% 
(342) Income (412) (144) (412) 0 0% 
- Net Expenditure 50 0 0 (50) -100% 
£000 £000 £000 £000 £000 %
15,221 Employee 13,465 5,113 13,465 0 0% 
100 Property 105 44 105 0 0% 
1,185 Transport and Plant 1,211 505 1,211 0 0% 
7,311 Supplies, Services and Admin 6,044 2,468 6,214 170 3% 
923 Payments to Other Bodies 930 388 930 0 0% 
(41) Other 0 0 0 0 0% 
24,699 Gross Expenditure 21,755 8,518 21,925 170 1% 
(25,153) Income (22,630) (9,143) (22,821) (191) -1% 
(454) Net Expenditure (875) (625) (896) (21) 2% 
Housing Maintenance Trading A/c
Private Sector Housing Grant
Anti Social Behaviour
Housing  Asset and Investment
Page 222

Page 223

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Homeless Persons 482 681 199 41% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Asset and Investment 50 0 (50) -100% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Budget Details
Variance Analysis
Variance
This service seeks to prevent homelessness occurring across the authority and improves
access to support services
The adverse variance is due to the inflationary effect on costs of white goods and furniture
together with requirement to retain bed and breakfast places due to demand / delay in having
WDC properties available,
It is expected that the need for bed and breakfast contingency will cease later in year as more
WDC properties become ready for occupancy. The forecast spend is based on the
expectation that use of  bed and breakfast will cease. If this does not happen then the
overspend will be greater.
A year end overspend is anticipated
31 August 2023
This service manages capital investment across council and private sector housing stock.
Employee costs are showing a favourable variance due to vacant posts within the service. 
Employee cost underspend is offset by a reduction in the level of income being recharged to
the Housing Revenue Account.
None Required
Slight underspend at year end
ITEM 16 -
APPENDIX 3
Page 223

Page 224

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2023/24
Efficiency Detail Reference
Budgeted
Amount £
Projection of
Total Saved £
Projection of
Total Not
Saved £
Comment
1 Reduce anti-social behaviour service HE01 127,000 127,000 0
2 Reduce the Modern Apprenticeship Pathway Scheme HE02 50,000 50,000 0
3 Increase amouint charged to DWP for Ashton View Rent HE03 10,000 10,000 0
4 Reduce Community budgeting grants HE05 6,000 6,000 0
5 Stop free driving lessons HE06 48,000 48,000 0
6 Reduce the Working 4U Service HE07 1,145,000 1,145,000 0
7 Reduce funding provided to West Dunbartonshire Citizen Advice Bureau HE08 87,000 87,000 0
8 WFU - Withdraw Flexible Options HE09 39,000 39,000 0
9 Reduce funding provided to Y-Sort-it HE10 39,000 39,000 0
10 Reduce the number of Tenant Liaison Officers from four to two HE11 99,000 99,000 0
11 Cost of Mitchell Way Office Accommodation moved to HRA HE12 42,000 42,000 0
12 Reduce the level of  funding available to Community Councils HE13 11,000 11,000 0
1,703,000 1,703,000 0
1
Reduce the Communities Team by 50% or Restructure Communities Team by
bringing W4U Youth Learning Team and wider Community Planning support into
the Communities Team
HE04 383,000 191500 191,500
Restructure in progress , awaiting job evaluations. Note that
the smoothing fund is being used to address in year shortfall.
The savings will be fully achieved in 2024/25.
383,000 191,500 191,500
TOTAL 2,086,000 1,894,500 191,500
STATUS: COMPLETE
STATUS: IN PROGRESS
ITEM 16 -
APPENDIX 4
Page 224

Page 225

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
PERIOD END DATE
PERIOD 5
Spend to Date Spend to
Date
£000 £000
Red
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
1 100.0% 906 100.0% 1 100.0% 0 100.0%
1 100% 906 100% 1 100% 0 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Actual
Variance Re-profiling Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
912 906 912 0 6 0 6 (0) (0) 0
912 906 912 0 6 0 6 (0) (0) 0
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 August 2023
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of Projects
at RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at RAG
Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
ITEM 16 - APPENDIX 5
Page 225

Page 226

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 912 906 99% 912 0 0%
Current Year Financials 6 0 5% 6 (0) 0%
Project Description
Project Manager Elaine Troup
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
31 August 2023
Budget Details
Project Life Financials
Spend to Date Variance
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated service delivery in
response to community need. This is complimented by community capacity building, empowering WD citizens to do more
for their own communities (leading to less reliance on council).  Also included is the implementation of participatory
budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The budget will continue to support and contribute to building capacity in communities.
Mitigating Action
Project complete
Anticipated Outcome
Project complete
ITEM 16 -
APPENDIX 6
Page 226