Page 1

Agenda
Housing and Communities
Committee
Date:  Wednesday, 22 February 2023
___________________________________________________________________
Time:  10:00 
___________________________________________________________________
Format:  Hybrid meeting
___________________________________________________________________
Contact: Email: Nicola.moorcroft@west-dunbarton.gov.uk     
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Housing and Communities Committee as detailed
above.
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Ian Dickson 
Councillor Gurpreet Singh Johal (Chair)
Councillor David McBride
Councillor Jonathan McColl
Councillor Michelle McGinty
Councillor Jim McElhill
Councillor John Millar 
Councillor Lawrence O’Neill
Councillor Lauren Oxley 
Councillor Martin Rooney
Councillor Hazel Sorrell (Vice Chair)
Councillor Sophie Traynor
All other Councillors for information
Chief Executive
Chief Officer - Housing and Employability
Chief Officer - Regulation and Regeneration
Chief Officer - Supply, Distribution and Property
Date issued: 9 February 2023
Audio Streaming
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site.
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/
Page 2

Page 3

HOUSING AND COMMUNITIES COMMITTEE
WEDNESDAY, 22 FEBRUARY 2023
AGENDA
1 STATEMENT BY CHAIR – AUDIO STREAMING
The Chair will be heard in connection with the above.
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record.
5 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
6 MINUTES OF PREVIOUS MEETING  7 – 11
Submit for approval, as a correct record, the Minutes of the Meeting of the
Housing and Communities Committee held on 23 November 2022. 
7 POLICE LOCAL POLICING PLAN (LLP) RENEWAL 13 – 49
Submit report by the Divisional Commander, Police Scotland setting out the
West Dunbartonshire Local Policing Plan 2023 – 2026.
8/
Page 3

Page 4

8 SCRUTINY REPORTS
(A) POLICE SCRUTINY REPORT QUARTER 3 2022/23 51 – 52
Submit report by the Divisional Commander, Police Scotland providing
members with an update.  
(B) FIRE AND RESCUE SCRUTINY REPORT   53 – 62
Submit report by the Local Senior Officer, Scottish Fire and Rescue
Service providing appropriate performance data measured against
priorities in the West Dunbartonshire Local Fire and Rescue Plan. 
9 HOUSING AND EMPLOYABILITY DELIVERY PLAN 2022/23 63 – 84
INTERIM REPORT
Submit report by the Chief Officer, Housing and Employability, setting out the
interim progress of the Housing and Employability Delivery Plan 2022/23.
10 SUPPLY DISTRIBUTION AND PROPERTY DELIVERY 85 – 94
PLAN 2022/23 – HOUSING ASSET AND INVESTMENT
AND BUSINESS SERVICES
Submit report by the Chief Officer, Supply, Distribution and Property, setting
out the interim progress of the Housing Asset & Investment and Building
Services priorities within the Supply Distribution & Property Delivery Plan
2022/23.
11 MORE HOMES WEST DUNBARTONSHIRE – WEST 95 – 102
DUNBARTONSHIRE COUNCIL AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME 
Submit report by the Chief Officer, Housing and Employability providing
an update on the progress of West Dunbartonshire’s More Homes
Programme which oversees the delivery of the Council’s new home building
programme.
12 WILLOX PARK SHELTERED HOUSING COMPLEX 103 – 107
Submit report by the Chief Officer, Housing and Employability providing 
an update on the action the Council is taking to understand the damp and
mould problems experienced by the tenants at Willox Park.
Page 4

Page 5

13 HOUSING REVENUE ACCOUNT BUDGETARY CONTROL 109 – 129
REPORT TO 31 DECEMBER 2022 (PERIOD 9)
Submit report by the Chief Officer, Resources providing an update on the
financial performance to 31 December 2022 (Period 9) of the Housing
Revenue Account (HRA) revenue and capital budgets for 2022/23.
14 FINANCIAL REPORT 2022/23 AS AT PERIOD 9 131 – 141
(31 DECEMBER 2022)
Submit report by the Chief Officer, Resources providing an update on the
financial performance to 31 December 2022 (Period 9) of those services
under the auspices of the Housing and Communities Committee.
_____________________________________________________________
Page 5

Page 6

Page 6

Page 7

HOUSING AND COMMUNITIES COMMITTEE
At a Hybrid Meeting of the Housing and Communities Committee held in the Civic
Space, 16 Church Street, Dumbarton on Wednesday, 23 November 2022 at 
10.00 a.m.
Present: Councillors Ian Dickson, Diane Docherty, Gurpreet Singh Johal,
David McBride, Jonathan McColl, James McElhill, Michelle
McGinty, John Millar, Lawrence O’Neill, Martin Rooney, Hazel
Sorrell and Sophie Traynor.
Attending: Peter Hessett, Chief Executive; Peter Barry, Chief Officer –
Housing and Employability; Angela Wilson, Chief Officer –
Supply, Distribution and Property; John Kerr, Housing
Development and Homelessness Manager; Nicola Pettigrew,
Housing Operations Manager; Martin Feeney, Building Services
Manager; Alan Young, Housing Asset and Investment Manager;
Michelle Lynn, Asset Co-ordinator; Nigel Ettles, Section Head –
Litigation (Legal Officer) and Nicola Moorcroft and Lynn Straker,
Committee Officers.
Also Attending: Superintendent Derek Lang and Chief Inspector Ryan McMurdo,
Police Scotland; Group Commander Gregg McKearney, Argyll
and Bute, East and West Dunbartonshire, Scottish Fire and
Rescue Service.
Councillor Gurpreet Singh Johal in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor Johal, Chair, advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that, there were no declarations of interest in any of the items of
business on the agenda.
RECORDING OF VOTES
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record.
ITEM 6
Page 7

Page 8

OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public 
MINUTES OF PREVIOUS MEETING 
The Minutes of the Meeting of the Housing and Communities Committee held on 24
August 2022 were submitted and approved as a correct record. 
VARIATION IN ORDER OF BUSINESS 
Having heard the Chair, the Committee agreed to vary the order of business as
hereinafter minuted. 
SCRUTINY REPORTS 
(A)  POLICE SCRUTINY REPORT 
A report was submitted by the Divisional Commander, Police Scotland
providing Members with an update. 
After discussion and having heard Superintendent Lang and Chief Inspector
McMurdo, Police Scotland, the Committee agreed to note the update
provided. 
(B)  FIRE AND RESCUE SCRUTINY REPORT 
A report was submitted by Local Senior Officer, Scottish Fire and Rescue
Service providing appropriate performance data measured against priorities in
the West Dunbartonshire Local Fire and Rescue Plan. 
After discussion and having heard Group Commander McKearney, Argyll and
Bute, East and West Dunbartonshire, Scottish Fire and Rescue Service, the
Committee agreed to note the content of the Scottish Fire and Rescue
Service West Dunbartonshire Council Quarter 2 (1 July 2022 – 30 September
2022) Report. 
Page 8

Page 9

HOUSING AND EMPLOYABILITY DELIVERY PLAN 
A report was submitted by the Chief Officer – Housing and Employability providing
the Housing and Employability delivery Plan for 2022/23. 
After discussion and having heard the Chief Officer – Housing and Employability,                
in further explanation and in answer to Members’ questions, the Committee agreed
to note the contents of the Plan. 
SUPPLY DISTRIBUTION AND PROPERTY DELIVERY PLAN 2022/23 – HOUSING
ASSET AND INVESTMENT AND BUILDING SERVICES 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing the Housing, Asset and Investment and Building Services elements of the
Supply Distribution and Property (SD&P) Delivery Plan 2022/23. 
After discussion and having heard the Chief Officer – Supply, Distribution and
Property in further explanation and in answer to Members’ questions, the Committee
agreed to note the contents of the Plan. 
MORE HOMES WEST DUNBARTONSHIRE STRATEGIC INVESTMENT PLAN
2023/24 – 2027/28 UPDATE REPORT 
A report by the Chief Officer – Housing and Employability seeking approval for the
More Homes West Dunbartonshire Strategic Housing Investment Plan (SHIP) for
2023/24 – 2027/28 which was required to be submitted to the Scottish Government. 
After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) the draft Strategic Housing Investment Plan (SHIP) 2023/24 - 2027/28 which
formed Appendix 1 to the report, designed to assist in the delivery of an
ambitious programme of new affordable homes as supported by the new
West Dunbartonshire Local Housing Strategy 2022 -27; and 
(2) to invite the Chief Officer – Housing and Employability to successfully
implement the Strategic Housing Investment Plan (SHIP) in partnership with
relevant stakeholders. 
MORE HOMES WEST DUNBARTONSHIRE – WEST DUNBARTONSHIRE
COUNCIL AFFORDABLE HOUSING SUPPLY DELIVERY PROGRAMME 
A report was submitted by the Chief Officer – Housing and Employability providing
an update on progress with West Dunbartonshire’s More Homes Programme, which
oversees the delivery of the Council’s new home building programme. 
Page 9

Page 10

After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the content of the report and the progress made to date in the delivery
of the Council’s More Homes West Dunbartonshire approach, including the
practical completion and handover of the latest development project at
Queens’ Quay (Site B); 
(2) to approve the undertaking to conduct all necessary procurement exercises
for the new identified sites within the Future New Build – West Dunbartonshire
Affordable Housing Supply Programme identified in section 4.3 of the report,
to deliver new council homes; and 
(3) to approve the acquisition of the former Clydebank Health Centre site, at the
cost of £707,400 from NHS Greater Glasgow and Clyde, for the delivery of
new Council homes. 
FORMER TENANT RENT ARREARS WRITE-OFFS 2022-2023 QUARTER 2 
A report was submitted by the Chief Officer – Housing and Employability, seeking
approval for the write-off of rent arrears for Quarter 2 of 2022/23 for former tenants,
arising from various years and reasons as detailed in Table 1 of the report. 
After discussion and having heard the Chief Officer – Housing and Employability in
further explanation and in answer to Members’ questions, the Committee agreed to
approve the write-off of former tenant arrears accounts, totalling £167,878.17. 
SCOTTISH SOCIAL HOUSING CHARTER / REGULATION OF SOCIAL HOUSING
IN SCOTLAND – PROGRESS REPORT 
A report was submitted by the Chief Officer – Housing and Employability providing
the Scottish Social Housing Charter indicators and an update into how the Council is
meeting the requirements of the Scottish Housing Regulator’s Regulatory
Framework. 
After discussion and having heard the Housing Development and Homelessness
Manager in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the contents of the report recognising the continued impact the COVID
-19 pandemic had on 2021/22 performance; 
(2) to note that a Charter Improvement Plan had been developed based on a
comprehensive assessment of performance and had informed the production
and publication of an annual Charter Performance Report; 
Page 10

Page 11

(3) to endorse and retrospectively approve the Annual Assurance Statement
which had been signed by the Housing and Communities Committee
Convener, on behalf of the Housing and Communities Committee and
submitted to the Scottish Housing Regulator in line with our regulatory
requirement; and 
(4) to note that a full annual progress report on the Scottish Social Housing
Charter would be submitted to the September 2023 meeting of the Housing
and Communities Committee. 
HOUSING REVENUE ACCOUNT (HRA) BUDGETARY CONTROL REPORT TO 30
SEPTEMBER 2022 (PERIOD 6) 
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 30 September 2022 (Period 6) of the HRA revenue and
capital budgets for 2022/23. 
After discussion, the Committee agreed:- 
(1) to note the revenue analysis showed projected adverse variances of £1.363m
which will be offset by reducing the contribution from revenue to capital
(CFCR) therefore netting to a revenue break even position; and 
(2) to note the net projected annual position in relation to the capital plan
highlighted an in-year variance of £27.230m (41.5%) which is made up of
projects requiring reprofiling of £27.816m (42.4%) and overspend of £0.585m
(0.9%). 
FINANCIAL REPORT 2022/23 AS AT PERIOD 6 (30 SEPTEMBER 2022) 
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 30 September 2022 (Period 6) of those services under the
auspices of the Housing and Communities Committee. 
After discussion, the Committee agreed:- 
(1) to note the contents of the report which shows the revenue budget forecast to
overspend against budget by £0.131m (2.82%) at the year-end; 
(2) to note the net projected annual position, in relation to relevant capital
projects, was showing no projected variance; and 
(3) to note the progress on efficiencies incorporated into budgets for 2022/23. 
The meeting closed at 12.12 p.m.
Page 11

Page 12

Page 12

Page 13

ITEM 7
Page 13

Page 14

Page 14

Page 15

OFFICIAL
West Dunbartonshire - L Division - Local Policing
Plan 
ITEM 7
Page 15

Page 16

OFFICIAL 
Contents
West Dunbartonshire - L Division - Local Policing Plan .............................................. 1
Foreword ................................................................................................................ 3
Introduction ............................................................................................................. 5
National strategic alignment ................................................................................... 6
Police Scotland’s strategic objectives ..................................................................... 7
West Dunbartonshire Local policing delivery context.............................................. 8
Local priorities ...................................................................................................... 10
Local objectives and activity ................................................................................. 13
Threats to public safety and wellbeing are resolved by a proactive and
responsive police service .................................................................................. 13
The needs of local communities are addressed through effective service delivery
.......................................................................................................................... 18
The public, communities and partners are engaged, involved and have
confidence in policing ........................................................................................ 22
Our people are supported through a positive working environment, enabling
them to service the public ................................................................................. 25
Police Scotland is sustainable, adaptable and prepared for future challenges . 28
Governance and performance .............................................................................. 31
Equality, diversity and inclusion ............................................................................ 32
Engaging with us .................................................................................................. 33
Page 16

Page 17

OFFICIAL
Foreword
As the Local Police Commander I am pleased to introduce the Local Policing Plan
for West Dunbartonshire for 2023-26.  I was proud to be appointed Divisional
Commander of Argyll and West Dunbartonshire in December 2021 and I would like
to thank my predecessor, Chief Superintendent John Paterson, for his commitment
and dedication to policing this area before my arrival in post.
This plan outlines how police officers and staff, working closely with partner agencies
through the community planning process, will focus on local policing priorities over
the next three years; it reflects the views of the diverse range of urban, rural, remote
and island communities across the area as well as drawing on information from
Police Scotland’s Strategic Assessment.
Much has changed since the compilation of the last Local Policing Plan in 2020 and
Police Scotland and our partners acknowledge the challenges and opportunities
which lie ahead, particularly when we consider both the continued recovery from the
global COVID pandemic and the current cost of living, creating an ever changing,
uncertain and complex environment.
Local Policing is at the heart of our relationship with communities and all of the
officers and staff working across Argyll and West Dunbartonshire are committed to
keeping our communities safe by providing a responsive, resilient and focussed
service. This Local Policing Plan reflects the need to collaborate, refocus and
redirect resources from across a range of sectors to meet the needs of the public.  I
am committed to developing and enhancing the strong community spirit that exists
by building close alliances with our communities and partners across the public,
private and third sectors to improve outcomes and reduce inequalities as set out in
the Community Empowerment (Scotland) Act 2015.
We are all aware of the impact vulnerability, mental ill-health, alcohol and substance
misuse has on both individuals and wider society.  A broader understanding of the
impact that living through the COVID pandemic has had is also starting to emerge,
including the harms caused to individuals.  The cost of living is likely to further impact
communities, families, households and businesses.  It has been well documented
that the associated demands placed on policing continue to grow with less than 20%
of all calls received by the police service resulting in a crime being recorded. 
Page 17

Page 18

OFFICIAL
In developing our Local Policing Plans for 2023-26, we have consulted widely with
our stakeholders – the public, partner agencies and our staff.  The feedback we
received has informed this plan.  We will address priorities and tackle the things
which you have told us matter to you the most.  This plan builds on the strong
foundations already in place, with a continued emphasis on crimes of violence and
protecting the most vulnerable members of our communities, road safety, thefts
(including cyber and digital frauds), drug supply and misuse and disorder.  In
addition to tackling traditional and visible crime and criminality, we must find different
ways to prevent, disrupt and respond to the ever more inventive and complex use of
digital tools and new tactics, often originating from beyond our borders, to commit
fraud, extort money or cause harm.  
Increased use of social media across all age groups brings with it the requirement to
raise awareness, through education, of the potential harm that can be caused and to
ensure everyone remains safe online and has the confidence to report any matters
of concern.  In these challenging times, it is clear that the police service cannot meet
the needs of everyone on its own. We will improve our skill-set by continuing to
actively participate in existing and new partnerships, listen to and learn from the
experience of our people and communities and utilise our policing expertise to
improve resilience, prevent crime and other harm.  
Whilst the demands and complexity of the challenges faced by Police Scotland
continue to evolve our core values of integrity, fairness, respect and human rights
will continue to underpin all we do. As your Local Police Commander I have a
statutory responsibility under the Police and Fire Reform (Scotland) Act 2012 to work
closely with West Dunbartonshire and Argyll & Bute Local Authorities to ensure our
Local Policing Plans are linked to the Local Outcome Improvement Plans.  I am
determined that officers and staff across the Argyll & West Dunbartonshire Division
continue to provide a visible, effective and efficient policing service that is relevant to
the communities we serve; preventing and detecting crime whilst providing support
and protection to those who need us.  I am immensely proud of the work police
officers and staff do every hour of every day across the Division to keep people safe,
and it’s my privilege to serve as your Local Police Commander.
Chief Superintendent Lynn Ratcliff, Local Police Commander, Argyll & West
Dunbartonshire Division
Page 18

Page 19

OFFICIAL 
Introduction
Argyll & West Dunbartonshire Division has a large geographical footprint. At just
under 3000 square miles, it reaches from Clydebank in West Dunbartonshire as far
north as Oban, out to Mull, Coll and Tiree and south to Islay and Kintyre.
West Dunbartonshire includes the towns of Clydebank, Dumbarton and Alexandria
and has a population of more than 89,000 people. 
It covers an area of around 98 square miles with residential and business
communities that stretch along the banks of the Clyde to the shores of Loch Lomond.
The Chief Constable of Police Scotland has ultimate and overarching responsibility
for the policing of Scotland as per Section 17 of the Police and Fire Reform
(Scotland) Act 2012. 
Section 47 of the Police and Fire Reform (Scotland) Act 2012 places a statutory
responsibility on each Local Police Commander to produce a policing plan for their
local authority area. These plans are not solely a legislative responsibility, but also
demonstrate Police Scotland’s commitment to delivering local and national
outcomes. 
Our Local Policing Plan 2023-2026 is linked to the West Dunbartonshire Local
Outcome Improvement Plan. It currently provides the priorities for West
Dunbartonshire:
Flourishing Our local community is flourishing
Independent Our adults and older residents are supported to remain
independent
Nurtured Our children and young people are nurtured
Empowered Our residents are empowered
Safe Our communities are safe
The Local Policing Plan will adapt to our changing challenges and demands and as
such will be reviewed every 3 months to ensure it accurately reflects the needs of
our communities within West Dunbartonshire. 
Page 19

Page 20

OFFICIAL 
National strategic alignment
Our strategic outcomes provide a clear route from the Scottish Government’s
outcomes and priorities, including the Justice Strategy, through Police Scotland’s
strategies, plans and performance reporting, enabling us to demonstrate alignment
and clearly articulate our ambitions and progress as demonstrated below. In addition
to the Annual Police Plan, Police Scotland’s thirteen local policing divisions produce
Local Police Plans which reference distinct priorities, objectives, outcomes and
performance measures. They link to wider community planning arrangements, with
Local Outcome Improvement Plans taken into account in their development.
 Scottish Government National Outcomes/Strategic Priorities/Justice Vision
 SPA/Police Scotland Strategic Outcomes
 Long Term Policing Strategy: Policing for a Safe, Protected and Resilient
Scotland
 Enabler strategies including People, Fleet, Estates, Public Contact and
Engagement, Enabling Policing for the Future, Digital Data and ICT, Cyber,
Environmental, Procurement, Violence against Women and Girls, Equality
Diversity and Inclusion
These are underpinned by plans including the Strategic Workforce Plan, Annual
Police Plan, Local Police Plans, Local Outcome Improvement Plans, and 
Financial Plans.
Page 20

Page 21

OFFICIAL 
Police Scotland’s strategic objectives
Page 21

Page 22

OFFICIAL 
West Dunbartonshire Local policing delivery context
Argyll and West Dunbartonshire Division covers almost 3,000 square miles of land
and sea. The area encompasses two local authority areas - West Dunbartonshire
and Argyll and Bute. For West Dunbartonshire we have a dedicated Area
Commander who has responsibility for day-to-day policing.
Whilst West Dunbartonshire has a population of just over 89,000 people, there are a
lot of tourist attractions in the area including Dumbarton Castle and of course Loch
Lomond which attracts people from all over the UK particularly during the summer
months. 
The area has a vibrant and diverse population and boasts a significant number of
small-scale commercial enterprises supporting the local community. 
Uniformed policing in the division consists of response officers, based at Dumbarton
Police Station who are responsible for the day to day policing presence in our
communities and are the first point of contact for the majority of our frontline
response. To compliment response officers, West Dunbartonshire has a dedicated
Community Policing Team who are embedded in our communities and will address
local issues at a local level. 
The Community Engagement Team (CET) provide specialist support to the Division
in respect of crime prevention, safer communities and architectural liaison work. The
CET prioritises the Divert and Deter strands of the Serious Organised Crime
Strategy and oversees local imbedding of the UK’s Counter Terrorism Strategy
known as Contest. Further to this, the CET leads equality and diversity matters and
oversees hate crime investigations within the division.
Specialist departments within the division include the Criminal Investigation
Department (CID), and the Public Protection Unit (PPU), responsible for the
investigation of serious crime, sexual crime and domestic abuse.
Page 22

Page 23

OFFICIAL 
Our Local Policing Division is supported by a number of national functions including
Specialist Crime Division (SCD), Operational Support Division (OSD), Partnerships,
Prevention and Community Wellbeing Division (PPCW). 
We are also supported by our Contact, Command and Control Division who provide
frontline advice, support and assistance to the public and police.  Their highly skilled
staff and officers provide 24 hour support to resolve enquiries, prioritise and task
incidents and supply our frontline officers with operationally critical information. 
The introduction of the Contact Assessment Model (CAM) changed the way Police
Scotland handles calls from the public. With CAM, each call is assessed and
prioritised to ensure that where a police response is required, it will be despatched
timeously. Where the matter does not require a policing response and would be
more effectively resolved by another agency, the call will be referred accordingly.
This ensures that communities across West Dunbartonshire receive support from the
most appropriate agency and enables police resources to be deployed more
effectively to prevent crime and disorder in your area.
Page 23

Page 24

OFFICIAL 
Local priorities
Page 24

Page 25

OFFICIAL
We engaged with the public on this Local Policing Plan through our Your Police
Survey, which has been running now for a number of years. We also carried out
specific engagement from November 2022 through to February 2023, providing an
opportunity for you to tell us what matters to you most for policing in West
Dunbartonshire. 
This reflected past consultation results and underlines that we continue to focus our
efforts on areas of concert for the communities we serve. The priorities you identified
were:
 Tackling anti-social behaviour
 Tackling crimes related to drugs and alcohol
 Visibility, presence and being approachable
 Traffic related offences
 Improved community engagement
 Tackling violence and domestic abuse
These priorities are not considered in isolation, for example our response to violence
against women and girls includes elements of a number of the priorities identified. 
Whilst public consultation with the people of West Dunbartonshire determines local
priorities, national priorities are identified through our National Strategic Assessment,
and these also feature in our Annual Police Plan. National priorities include:
 Protecting vulnerable people
 Tackling crime in the digital age
 Working with communities
 Support for operational policing
Together with the local priorities you identified and our shared partnership objectives,
we will focus our efforts with equal commitment and determination to deliver positive
outcomes for the communities we serve. The resources which inform our priority
setting are: 
Page 25

Page 26

OFFICIAL 
 Locally we have engaged with our communities to provide results from the
Your Police Survey open to everyone in our community of West
Dunbartonshire.
 Nationally, we have sources such as the Police Scotland National Strategic
Assessment (2023/26) providing crime and incident data, Police Scotland
Annual Police Plan (2023/24)
 West Dunbartonshire Local Outcome Improvement Plan
 Community Impact Assessments
 Equality and Human Rights Impact Assessments
Taking the local priorities provided by you, alongside our own Strategic Assessment
and partnership objectives, the overall priorities for the West Dunbartonshire Local
Policing Plan are:
 Acquisitive Crime
 Public Protection
 Road Safety and Road Crime
 Serious Organised Crime
 Violence and anti-social behaviour
Only by working together can we achieve the shared vision of a West
Dunbartonshire which has a positive, equitable and inclusive future.
Page 26

Page 27

OFFICIAL
OFFICIAL
Local objectives and activity
Threats to public safety and wellbeing are resolved by a proactive
and responsive police service 
We find ourselves moving at an ever-increasing pace from the physical to the digital
world; a move that creates new and complex crime types. It also affects traditional
crime, much of which now has a digital element.
To protect our communities effectively, we will continue to explore innovative
technologies and partnerships.
We will continue to be a key contributor to local joint planning and delivery, helping
drive a shift to prevention and early intervention across services.
Objective: Keep people safe in the physical and digital world
Activity: Implement new measures to reduce threat, risk and harm to vulnerable
missing people.  
Key Milestones:
 Ensure Herbert Protocol continues to be implemented for those living with
dementia whether at home or in care establishments.
 Promote the use of the Purple Alert app within communities to enable
community awareness to find someone living with dementia if they go
missing.
 Hold focus groups with those living with dementia, younger people and those
in the business sector around the use of Dementia Safeguarding Tags.
 Develop a communications plan to launch the Dementia Safeguarding Tags
with those living with dementia, business sector and wider public.
 Launch the Dementia Safeguarding Tags within communities of West
Dunbartonshire.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
Page 27

Page 28

 How effective is the implementation of the Herbert Protocol in helping find
people living with dementia who go missing?
 How well have Argyll and West Dunbartonshire Police Division promoted the
Purple Alert app?
 How effective is the Dementia Safeguarding Tag in assisting people living with
dementia when they are out in the community?
Activity: Work with partners to reduce the impact of cyber related harm.
Key milestones: 
 Deliver cyber-related harm awareness events to those most at risk including
vulnerable adults and younger people, alongside partner agencies including
Trading Standards.
 Increase preventative work to highlight dangers of cyber-crime including use
of Youth Engagement Officers to deliver inputs to schools and Community
Engagement officers to deliver inputs to older adults.
 Work with partners in education to prevent cyber bullying.
 Work with partners in education to provide parents with tools to keep their
young people safe online.
Update expected: Y1-3 Quarterly 
Performance measures and insights:
 How many cyber-crime awareness events have been held with partner
agencies?
 How effective has the division been in reducing the impact of cyber-crime?
 How well are Argyll and West Dunbartonshire doing in providing information to
parents to help prevent cyber-bullying?
Objective: Design services jointly to tackle complex public safety and
wellbeing challenges
Activity: Develop partnership approaches to tackle drug related deaths, drug related
harm and improve community wellbeing
Key milestones: 
Page 28

Page 29

OFFICIAL 
 Focus intelligence led proactive operations to divert those involved in drugs
supply across the geography from travelling to supply drugs.
 Contribute to all drugs related death reviews as part of the Alcohol and Drugs
Partnership in West Dunbartonshire.
 Provide drug supply awareness (known as County Lines) inputs to front line
partners including social work, education staff, housing and environmental
services. Enhance our approach to those exploited by Serious Organised
Crime Groups in the drugs supply chain, safeguarding victims and maximising
investigative focus on bringing those involved in the coordination of such
activity to justice.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 Have intelligence-led proactive operations led to an increase in drug-related
detections?
 How well received are our inputs at Drugs Related Death Review meetings
chaired by the Alcohol and Drugs Partnership?
 How effective are Argyll and West Dunbartonshire Police Division in
encouraging the reporting of drug intelligence within communities?
Activity: Implement a refreshed approach to Children and Young People
underpinned by a Children’s Rights Approach to policing.
Key milestones: 
 Work with child protection partners to mitigate the risks posed to children and
young people including online sexual abuse and exploitation.
 Ensure we meet our corporate parenting responsibility by upholding the rights
and securing the wellbeing of Care-Experienced Young People.
 Create a refreshed Joint Investigative Interview (JIT) suite in Dumbarton
Police Station to improve our response to child protection for children who
have been abused or neglected.
 Provide a consistent point of contact for the school community, delivering and
participating in inputs and initiatives to provide focus on early and effective
intervention through education.
Page 29

Page 30

OFFICIAL 
 Introduce the Scottish Child Interview Model (SCIM) to ensure best practice of
local authority and police working closely together to provide the best possible
service to children at risk.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 What work has been carried out with partners to mitigate the risks of online
sexual abuse and exploitation, and how effective has this been?
 Has the JIIT suite in Dumbarton been completed and how effectively is this
being used?
 How many inputs have been provided within education establishments for
young people?
 Has the roll out of SCIM taken place and how successful has this been?
Objective: Support policing through proactive prevention
Activity: Support the implementation of Distress Brief Intervention throughout West
Dunbartonshire.
Key milestones: 
 Identify and train officers suitable for the launch of Distress Brief Intervention
taking an incremental approach to ensure adequate service provision with
Level 1 providers.
 Support officers in completion of both online and face to face training to
ensure they are appropriately trained as Level 2 officers.
 Monitor referrals to Support in Mind Scotland in accordance with training
provided for Level 2 referring officers.
 Promote Distress Brief Intervention as an additional tool to support those with
low level distress.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How many officers have completed the training for Distress Brief Intervention?
 Is training, awareness and guidance in place for officers and staff within the
required timescales?
Page 30

Page 31

OFFICIAL 
 How many referrals have been made that are suitable for engagement with
Support in Mind Scotland?
 How effective are Argyll and West Dunbartonshire Police Division in
supporting the implementation of Distress Brief Interventions?
Activity: Support the delivery of the National Water Safety Strategy to reduce
accidental drownings and water-related suicides. 
Key milestones: 
 Be a key stakeholder in a partnership approach to water safety in West
Dunbartonshire.
 Engage with education to provide a positive impact into the secondary school
curriculum
 Work with staff to improve water safety awareness and operational
effectiveness.
 Adopt a positive media strategy to promote water safety.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How well are Argyll and West Dunbartonshire Police Division contributing to
the Partnership Approach to Water Safety?
 Have the number of water related incidents seen a change since the start of
our educational activity?
 Is messaging around social media consistent across all partners to get the
right messages across?
Page 31

Page 32

OFFICIAL 
The needs of local communities are addressed through effective
service delivery
To create your Local Police Plan we have engaged and consulted with the public,
stakeholders, community representatives and partners including other service
providers to ensure we have a shared understanding of the local community and the
role of policing within it.
We will continue to improve the services we provide as society evolves, embedding
accessibility and inclusivity into all that we do.
We continue to be able to call upon additional operational support and specialist
services to assist with incidents and investigations, large planned and unplanned
events, and other situations where these resources are needed, ensuring our focus
remains on the needs of the local community. 
Objective: Understand our communities and deliver the right mix of services to
meet their needs
Activity:  Tackle residential and commercial housebreakings and other forms of
acquisitive crime through preventative measures 
Key milestones: 
 Deliver preventative messages and mediums to provide wide ranging
education to all sections of our community including those who may not yet
have reliable internet services.
 Provide inputs with elderly communities on fraud prevention and increase the
capability of “cared for at home” network to educate those who may be
housebound for the purpose of preventing frauds.
 Strengthen local partnerships making use of technologies, including ‘Call
Blockers’ to reduce the likelihood of fraud.
 Deliver a programme of events with the business communities and financial
institutions to raise awareness, encourage target hardening, target criminality
and protect those vulnerable to acquisitive crime.
Page 32

Page 33

OFFICIAL 
 Continue to work with West Dunbartonshire Council, sharing information
where possible and jointly promoting campaigns such as Shut out Scammers.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How are different platforms being used to push out education and prevention
messages?
 How effective are prevention messages to differing age groups within our
communities?
 How many funding applications have had success?
 How effective are the partnerships in Argyll and Bute in preventing frauds and
other acquisitive crimes?
 How many referrals have been made?
Objective: Support our communities through a blend of local and national
expertise
Activity: Develop a robust process to tackle anti-social behaviour including both
indoor and outdoor violence 
Key milestones: 
 Draft and implement a revised Information Sharing Protocol for ASB in
conjunction with West Dunbartonshire Council and Registered Social
Landlords.
 Focus priority actions with ASB partners to ensure victims are protected and
those responsible are engaged.
 Implement Summer Safety and Festive Safety Plans in relation to the night
time economy and licensed premises in conjunction with partners in West
Dunbartonshire Council and licensees.
 Increase the number of trained Keep Safe Places present throughout West
Dunbartonshire to assist in tackling hate crime and supporting vulnerable
people to live independently within our communities.
 Improve our information sharing on youth related issues with partner agencies
and the School Community, identifying and focussing on young people in
Page 33

Page 34

OFFICIAL 
particular who are displaying behavioural difficulties, who are offending or at
risk of offending in the school or in the wider community.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 Is our Information Sharing Protocol regarding ASB up to date and fit for
purpose?
 How effective are our multi-agency ASB meetings at protecting victims?
 How many monitored licensed premises do we have in West Dunbartonshire?
 How have the number of Keep Safe places changed in West Dunbartonshire?
 How effective is Argyll and West Dunbartonshire Police Division at tackling
violent crime?
Activity: Improve and encourage reporting of domestic abuse throughout all
communities and target perpetrators
Key milestones: 
 Ensure domestic abuse investigations are progressed in accordance with
Police Scotland’s forthcoming Violence against Women and Girls strategy.
 Provide inputs from specialist departments to frontline officers who routinely
attend domestic incidents.
 Support local and national domestic abuse campaign material through social
media, officers promoting at community councils and via the displaying of
posters.
 Support businesses in our local communities to receive Domestic Abuse
awareness training through Medics against Violence (MAV).
 Enhance local focus for domestic incidents through Multi Agency Tasking and
Coordinating (MATAC) by proactively targeting domestic abuse offenders at a
local level, supported by national specialised expertise and alignment with
Multi Agency Risk Assessment Conference (MARAC)
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How effective is Argyll and West Dunbartonshire Police Division at keeping
victims of domestic abuse safe, and encouraging them to report incidents?
Page 34

Page 35

OFFICIAL 
 How supported do our response officers feel when dealing with domestic
abuse incidents?
 How is our support for local and national campaigns received?
 How many businesses have we engaged with to encourage sign up to the
Medics against Violence inputs?
Objective: Support the changing nature of communities
Activity: Through intelligence led policing and proactive engagement with all road
users, reduce death and serious injury on West Dunbartonshire’s road network. 
Key milestones:  
 Deliver a calendar of campaign activity, in partnership with key stakeholders,
to improve driver attitudes/behaviour and reduce injury on the road network
throughout West Dunbartonshire.
 Work with GPs and social work departments to ensure those suitable for
DVLA assessments for retaining driving licences are supported by partner
agencies.
 Make our roads safer by positively influencing driver, cyclist, pedestrian and
horse rider behaviour through high visibility patrolling by specialist Roads
Policing Officers and use of Operation Close Pass and Lose the Blinkers.
 Carry out high visibility speed detection in local communities at locations of
most concern.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How effective are Argyll and West Dunbartonshire Police Division’s activities
in improving road safety in West Dunbartonshire?
 How well is the division doing in encouraging referrals to DVLA where
someone may not be suitable to continue driving?
 How well received have Operation Close Pass and Lose the Blinkers been in
promoting road safety?
 Have road deaths and serious injuries been reduced in West Dunbartonshire?
Page 35

Page 36

OFFICIAL 
The public, communities and partners are engaged, involved and
have confidence in policing 
Our values are at the heart of everything we do.  Our human rights based approach
to policing along with ethical and privacy considerations are of the utmost importance
to the service we provide. The communities we serve should feel confident that we
will always police in a way that is fully underpinned by our values of fairness,
integrity, respect and human rights.
The safety and wellbeing of the people we serve are enhanced by providing services
that work efficiently. We will listen and seek to understand the changing needs of
diverse communities, bringing both professionalism and empathy to our interactions
and making changes to our services when required. Engaging with people
strengthens relevance, responsiveness and accountability and builds trust. We will
improve and refocus our engagement activities where these are not reaching diverse
communities and are not representative of the society we serve. 
Objective: Embed the ethical and privacy considerations that are integral to
policing and protection into every aspect of the service 
Activity: Enable and support effective engagement and communication with the
public, including promotion of our Local Police Plan  
Key Milestones:
 Ensure Your Police Survey is accessible for all including those who do not
have access to electronic means.
 Utilise forms of communication including Neighbourhood Watch Scotland
Alerts, Rural Watch, local newspapers and community newsletters to ensure
effective engagement for those who do not engage directly with Police.
 Conduct focused engagement events with our local communities, paying
particular attention to seldom heard groups who might not engage digitally
with Police Scotland.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
Page 36

Page 37

OFFICIAL 
 How well are we engaging with the public in continual dialogue to ensure
effective and inclusive input to the Local Police Plan?
Objective: Protect the public and promote wellbeing across Scotland by
providing services that are relevant, accessible and effective
Activity: Promote and improve rural communities and environmental wellbeing so
that people can flourish and feel safe. 
Key milestones: 
 Lead on the Divisional Partnership against Rural Crime group ensuring all key
partners are involved and included.
 Support awareness of livestock worrying offences and coordinate local
campaigns focusing on consequential outcomes and publicise successful
prosecutions.
 Build local and national intelligence profiles of those involved in rural theft
through use of technologies.
 Increase use of Rural Watch to detect and intercept suspect vehicles.
 Raise awareness of up to date security methods and produces and share
proven prevention tactics and techniques to make fuel more difficult to steal
from rural locations.
 Support equestrians to have safe and responsible access to the countryside
and promote equine road safety.
 Improve prevention and detection of wildlife crimes.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How well supported do those in the rural communities feel by Argyll and West
Dunbartonshire Police Division?
 How effective has the livestock worrying campaigns been in preventing
livestock attacks?
 What have we done to build local intelligence profiles?
 How many members are signed up to Rural Watch and how well used is this
platform been in raising awareness of rural crime?
Page 37

Page 38

OFFICIAL 
 How well are we promoting up to date security methods through letters to
victims of rural crime and proactively on social media?
 How well have we supported the equine community to be safe on the roads?
 How has the prevention and detection of wildlife crime changed?
Objective: Work with local groups and public, third sector and private sector
organisations to support our communities
Activity: Engage with third sector groups and partners in West Dunbartonshire
Council to support refugees, including those displaced by the conflict in Ukraine.
Key milestones: 
 Participate in community planning to ensure that displaced people have a
distinct route to accommodation, support and care.
 Work with third sector groups to raise awareness of Police Scotland and the
support services we provide amongst refugees
 Expand the Keep Safe initiative to be inclusive for refugees to use and
access. .
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 Does qualitative feedback from third sector refugee groups indicate that
refugees feel supported by Argyll and West Dunbartonshire Police Division?
 How many community events have we attended supporting refugees?
 How well have we promoted the Keep Safe Initiative to be inclusive for
refuges?
Page 38

Page 39

OFFICIAL 
Our people are supported through a positive working environment,
enabling them to service the public 
The safety and wellbeing of our officers and staff are at the heart of Police Scotland’s
commitments. The challenges for policing are significant and the part policing plays
in daily life will become ever more important as society faces huge challenges.
Policing is also coming under increasing scrutiny and pressure in relation to our
actions.
We will create the environment for our staff to be able to work effectively and equip
them to make decisions, ensuring they are trusted and empowered to do so.
Objective: Prioritise wellbeing and keep our people safe, well equipped and
protected
Activity: Enhance our communication throughout Argyll and West Dunbartonshire
policing division to focus on our people, ensuring they have a strong identity.
Key milestones: 
 Engage with staff and officers across West Dunbartonshire to develop a
communication strategy that fits their needs.
 Produce a monthly divisional bulletin that is people focussed and celebrates
achievements of officers and staff through a person centred approach.
 Ensure enhanced local representation from Scottish Police Federation to
ensure we are listening to concerns raised by our people and that their views
are acted on.
 Continue to develop and monitor responses to the staff survey and ensure
that our responses are visible to our officers.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How has local communication evolved to suit the requirements of officers and
staff?
 How well is our bulletin being received by frontline officers and staff at
addressing the items they wanted to be included?
Page 39

Page 40

OFFICIAL 
 What local footprint do we have for local divisional federation representatives
at all ranks?
 What progress have we made since the latest staff survey in supporting the
needs of our people?
Objective: Support our people to be confident leaders, innovative, active
contributors and influencers
Activity: Establishment of Divisional Improvement Team to ensure local officers are
well connected and supported. 
Key milestones: 
 Increase our capability for Specially Trained Officers (Taser deployments) for
all communities throughout Argyll and Bute providing a safe geographical
coverage.
 Continue to promote wellbeing champions and access to support services
such as Police Treatment Centres, occupational health and Employee
Assistance Programme.
 Promote Your Safety Matters for all officers and staff in Argyll and West
Dunbartonshire Police Division.
 Establish staff led improvement group to ensure all officers and staff are
listened to and that change is driven from the grassroots of our service.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How many officers are Taser-trained, and what is our spread of Taser-trained
officers throughout West Dunbartonshire?
 How well are our officers being supported in accessing support services and
are these being well used?
 Are we promoting Your Safety Matters in a meaningful way?
 How has our staff-led improvement group led to change in West
Dunbartonshire?
Objective: Support our people to identify with and demonstrate Police
Scotland values and have a strong sense of belonging
Page 40

Page 41

OFFICIAL 
Activity: Develop and implement divisional people plans to support the
implementation of the People and Equality, Diversity and Inclusion strategies.
Key milestones: 
 Review and evaluate existing approach
 Support officers through lateral and vertical development by identifying those
suitable for both local and national training.
 Develop and support our probationary Constables and Sergeants through the
national structured continuous professional development programme.
 Make progress towards ensuring that our workforce is representative of the
communities it serves and undertake positive action recruitment with under-
represented communities.
 Enhance support to first line managers through creation of a supervisory
toolkits relevant to West Dunbartonshire.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How does Argyll and West Dunbartonshire Police Division proactively
promote and support equality, diversity and inclusion initiatives?
 Do our people feel like they are being developed in accordance with their
ambitions?
 How well are we at supporting positive action recruitment?
 Is the supervisory toolkit fit for purposes and being well used, how are we
ensuring feedback and regular updates?
Page 41

Page 42

OFFICIAL 
Police Scotland is sustainable, adaptable and prepared for future
challenges
Ongoing political, technological, economic and societal changes as well as
unforeseeable emergencies on a local and global scale require the police service to
adapt and respond to future challenges in order to maximise the benefits of future
opportunities. This includes working to reduce the impact of our activity, estates and
fleet on the environment. Police Scotland aims to make a significant contribution to
the Scottish Government’s 2040 carbon neutral target and 2045 zero greenhouse
gas emissions target.
Everyone has a role to play in improving financial sustainability, making efficient use
of resources and eliminating waste to deliver best value. Procurement of and
demand for goods and services will remain under scrutiny, ensuring resources are
used in the most efficient way possible to meet the greatest need.
Objective: Use innovative approaches to accelerate our capacity and capability
for effective service delivery
Activity: Seek out shared learning and training opportunities with partners
Key milestones:
 Awareness inputs to response and community front line officers on services
available for families affected by drugs in conjunction with the Alcohol and
Drugs Partnership.
 Encourage shared water safety attendance at training events alongside
Scottish Fire and Rescue Service and other Community Planning Partners.
 Promote dementia awareness training with West Dunbartonshire Community
Volunteer Services and the Health and Social Care Partnership.
 Partnership involvement in delivery of Distress Brief Intervention Training
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 Have frontline officers felt a benefit to the awareness sessions around families
affected by drugs?
Page 42

Page 43

OFFICIAL 
 Have Argyll and West Dunbartonshire Police Division supported water safety
training and learning sessions?
 How well prepared are frontline officers to provide a compassionate response
to people living with dementia?
 How many officers are trained to provide Distress Brief Intervention referrals?
Objective: Commit to making a positive impact through outstanding
environmental sustainability
Activity: Develop and implement innovative and sustainable methods to deliver a
modern policing service in West Dunbartonshire. 
Key milestones: 
 Identify training and funding for cycling equipment for our officers.
 Better utilise pedal cycles for officers in smaller villages to provide visibility
and approachability
 Continue to support the roll out of electric vehicles.
 Foster biological diversity and improve wellbeing of staff by establishing green
space for social, recreation and relaxation activities.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How many cycle trained officers do we have in West Dunbartonshire?
 How accessible are alternative transport methods for officers carrying out high
visibility patrols and community engagement?
 Are electric vehicles being utilised within West Dunbartonshire and what is the
footprint of vehicle availability across our hubs.
Objective: Support operational policing through the appropriate digital tools
and delivery of best value
Activity: Support the implementation of the digital data and ICT strategy including
Mobile Working, national Core Operating System and Digital Evidence Sharing
Capability 
Key milestones:
Page 43

Page 44

OFFICIAL 
 Support the training of officers in receiving Mobile Devices for notebook
purposes.
 Support the development of the national Core Operating System by ensuring
local officers are able to use the system effectively and this is quality
controlled.
Update expected:
 Y1-3 Quarterly
Performance measures and insights:
 How well are Argyll and West Dunbartonshire Policing Division doing to roll
out the use of mobile devices to operational officers?
 What local training and awareness is available to support officers in using the
COS systems.
Page 44

Page 45

OFFICIAL
Governance and performance
Policing by consent is the bedrock of our approach. Public trust and confidence can
only be maintained through the legitimacy engendered by effective governance,
transparency and accountability. 
Our Performance Framework links to our local and national plans enabling
monitoring and measurement of progress on our priorities for policing and strategic
outcomes.
Key to delivering excellence in service provision is working collaboratively to support
the Community Planning Partnership and the Community Empowerment (Scotland)
Act 2015. 
Our Local Police Plan reflects the priorities that local communities, businesses and
organisations have told us matter most to them. We will continue to work with our
communities and partners to listen to concerns and ensure we respond effectively to
emerging issues. 
An overview of divisional performance against our strategic outcomes and shared
objectives is provided by the Divisional Commander at the West Dunbartonshire
Housing and Communities Committee on a quarterly basis. The performance reports
are a matter of public record and are stored on the West Dunbartonshire Councils’
Website.
Local Area Commanders regularly liaise with and provide updates to the community
and elected representatives at various forums and, to complement this, Community
Policing Officers provide local policing ward updates to Community Councils and
residents’ groups.
Page 45

Page 46

OFFICIAL 
Equality, diversity and inclusion
Our work is underpinned by our commitment to equality and diversity, both in our
dealings with the public we serve and our own staff. We promote the core policing
values of human rights, integrity, fairness, and respect within our organisation and
the communities we police.
We recognise that effective consent-based policing must reflect the needs and
expectations of the individuals and local communities we serve. Our aim is to ensure
that our service is fair, consistent and transparent and that we focus on our key
objective of protecting the most vulnerable in our society. 
The Code of Ethics for policing in Scotland sets out the standards of behaviour
expected of all staff. It encapsulates Police Scotland’s core values and statutory
obligations under the Police and Fire Reform (Scotland) Act 2012. The Code sets out
both what the public can expect from us and what we should expect from each other.
The Scottish Police Authority (SPA) Equality Outcomes sets out their commitment to
not only comply with equality legislation, but to ensure that the implementation of
their equality actions positively contributes to a fairer society through advancing
equality and good relations in all that we do. 
We are committed to developing and promoting best practice in the refresh of our
Equality outcomes for 2022. These can be found along with our commitment and
duties to equality, diversity & inclusion at: 
https://www.scotland.police.uk/about-us/how-we-do-it/strategic-planning/policing-
together-equality-diversity-and-inclusion-strategy/ or via the QR code.
Page 46

Page 47

OFFICIAL
This plan has been subject to an Equalities and Human Rights Impact Assessment
(EqHRIA) in compliance with the Scottish Public Sector Equality Duty. Separate
EqHRIAs will be undertaken for the activities described in this plan as required.
Engaging with us
Argyll and West Dunbartonshire Police Division
Dumbarton Police Station
Stirling Road
Dumbarton
G82 3PT
We are here to help
Dial 999 for an emergency that requires urgent police attention.
For non-emergency contact call the 24- hour non-emergency contact centre on 101.
If you have information about a crime in your area and wish to provide it
anonymously, call Crimestoppers charity on 0800 555 111. 
If you have any concerns or issues you wish to discuss, you can contact your local
Community Policing Team by phoning 101.
For more detailed information about your local Community Policing Team and other
services that Police Scotland provides, please visit our website at
www.scotland.police.uk 
If you would like this information in an alternative format or language, please phone
us on 101 to discuss your needs. Service users who are deaf or have a hearing
impairment can contact Police Scotland via Next Generation Text (NGT) on 18001,
101 for non-emergency, or 18000 in an emergency.
Page 47

Page 48

OFFICIAL
Meaningful and effective engagement involves genuine dialogue, respect, integrity,
transparency and accountability. It provides an opportunity for people to shape our
services and influence decisions made. Insight from effective engagement helps
identify practical solutions and determine changes required to meet the needs of the
communities we serve. 
Police Scotland is committed to continuous improvement in all that we do. If you
have something to tell us about our service, please contact us at:
https://www.scotland.police.uk/contact-us/ 
Further information about our wider engagement can be found in our consultation
and engagement hub at: https://consult.scotland.police.uk/ 
Police Scotland has a number of active social media channels that provide a range
of information and insight into policing, both nationally and in your local area. A full
list of our social media accounts can be found on our website. Our local channels
can be found at:
Twitter: West Dunbartonshire Police
Facebook: Argyll and West Dunbartonshire Police Division
Please note that our social media channels are not monitored 24/7 and should not
be used for reporting crime. Please dial 999 in an emergency, and 101 in a non-
emergency situation.
Inclusive and accessible engagement.
We aim to embed accessibility and inclusivity into our services to make them work
for everyone. 
This Local Police Plan was subject to an Equality and Human Rights Impact
Assessment (EqHRIA). A summary of the EqHRIA has been published alongside
this document at [still in development].
Page 48

Page 49

OFFICIAL 
This Local Police Plan can be made available in various alternative formats. For
more information, please contact us via our online form:
https://www.scotland.police.uk/contact-us/.
Deaf, deafened, hard of hearing or speech-impaired callers can contact us via Text
Relay on 18001101.
Page 49

Page 50

Page 50

Page 51

OFFICIAL
OFFICIAL 
Figures recorded at the end of Qtr. 3 show a 5.9% increase
(+8) in Group 1 crimes of violence compared to the PYTD.
In addition, the current figure of 143 remains above the
previous 5 year average (120.4). While serious assaults
have reduced by 9.5% from 63 to 57, this has been offset
by a slight increase in robberies which have risen from 14
to 19 (+5). Crimes relating to Human Trafficking and
Abduction have also both increased by 5 crimes each.  Five
of the 6 abduction crimes occurred in private space with 3
being domestic-related.
Across Argyll & West Dunbartonshire 17 persons
linked to serious and organised crime have been
arrestedand £124,825seizedunder POCA.
Compared to the same period last year, the total number of
bogus crimes recorded within West Dunbartonshire has
decreased from 51 to 48 crimes. 79% (n=38) of all bogus
crimes recorded YTD related to social engineering frauds
involving scam phone calls/emails. 10 crimes related to bogus
workmen/callers.
At the end of Qtr. 3 acquisitive crimes show a 7.1% increase compared to the same
period last year (+74), although the current figure (1114) remains below the previous 5
year average (1187).  Housebreaking crimes have increased slightly by 3.7% (+4) due to
a rise in domestic HB’s from 68 to 76 (+8) and a rise in HB’s at commercial properties
from 22 to 25 (+3). The increase in Housebreaking may be as a result of a reduction in
those working from home. Fraud crimes have increased by 25.7% from 152 to 191 with
the current figure remaining considerably above the previous 5 year average (n=113.4).
The cost of living crisis may explain why online market frauds have seen the highest
increase from 24 to 37 crimes (+13) year on year, followed by frauds involving unpaid
taxi fares (+12) and identity frauds (+9). Common thefts and shopliftings have also
increased by 11.3% (n=34) and 11% (n=33) respectively. Much of the increase in common
thefts is due to a rise in thefts of fuel.
At the end of Qtr. 3, drugs supply charges had reduced by 18.9% from 74 to
60. Drug possession charges had also reduced by 7.9% from 504 to 464. Both
figures remain below the previous 5 year average.
At the end of Qtr. 3, figures show a 30.8% increase in the total number of road
traffic offences recorded within West Dunbartonshire from 1652 to 2160.  The
current figure also remains 23.8% above the previous 5 year average (1745).
Speeding offences have seen the highest increase from 240 to 524 crimes (+284),
while using a motor vehicle without a test certificate and seat belt offences have
also risen from 272 to 350 (+78) and 30 to 77 (+47) respectively. Insurance,
mobile phone and careless driving offences have seen a reduction year on year.
Set against figures recorded at the end of Qtr. 3 last
year, Group 2 sexual crimes have seen a 19.2%
reduction with 135 crimes recorded compared to
167 last year (-32). Rape crimes have reduced from
34 to 24 (-10), while sexual assaults have also
decreased by 34.8% from 66 to 43 year on year.
Approx. two thirds of all sexual assaults occurred
within a private space, half of which related to non-
recent reports and 13% domestic-related. Crimes
relating to indecent images/communications have
also reduced from 51 to 45 crimes with 62% being
committed by strangers to the victim. 
The overall detection rate for Group 2 sexual crime has seen a notable increase
from 49.7% to 69.6% compared to the PYTD and is currently above the previous
5 year average (50.3%). The detection rate for indecent/sexual assault has
increased significantly from 37.9% to 95.3% (+16 crimes), largely due to
improved forensic opportunities and returns.  The detection rate for rape crime
has also increased from 44.1% to 50%.
At the end of Qtr 3, 263 missing person reports had
been recorded which is an increase of 32.2% from 199 in
the PYTD period. The increase is due to a rise in the
number of MP reports relating to children, from 80 to
160 year on year.
Figures recorded at the end of Qtr. 3 show a reduction of 12.1% in domestic
abuse incidents from 1070 to 940 (-130) which is 8.2% below the previous 5 year
average. Domestic abuse crimes have also seen a reduction of 10% from 663 to
597 (-66) however, the current figure remains marginally above the previous 5
year average (n=588.4). 
In total 74 cyber-crimes had been recorded within West
Dunbartonshire at the end of Qtr. 3, which is a significant
reduction from 183 in the same period last year. Cyber-Enabled
frauds account for 59% of all crimes recorded (n=44) YTD, whilst
14 crimes related to threatening and abusive messages on
social media and 8 to indecent images or communication.
User Satisfaction results show that Ease of contact: 49% of service-users
agreed it was very easy. This is above the national average: 68.78% agreed
they were provided with the appropriate response which is above the national
average. Overall satisfaction 52.76% of service-users were very above the
national average.
At the end of Qtr. 3, 89 complaints against the police had been recorded within
West Dunbartonshire which is a marginal change from 91 last year. The
number of allegations against officers has also seen marginal change year on
year from 165 to 163.
Compared to the PYTD, the detection rate for Group 1 crime has reduced slightly from
68.9% to 60.8% (-6 crimes) and is below the previous 5 year average (74.3%).  The
detection rate for serious assaults has reduced from 71.4% last year to 66.7% (-7 crimes)
and for robbery from 78.6% to 68.4%, albeit 2 more crimes have been detected YTD.  The
detection rate for common assault remains higher than last year at 71.2% and is slightly
above the previous 5 year average (67.2%).  
Overall public reported ASB incidents continue to show a noticeable
downward trend, largely due to a decrease in public nuisance incidents.
Complaints relating to disorder have also reduced by 24.8% (-975).  ASB
related crimes have seen a decrease of 4.6% (-94) while the current figure is
also 8.1% below the previous 5 year average. Common assaults continue to
show a slight increase of 2.6%.  Assaults resulting from family disputes have
seen the highest increase YTD from 43 to 57 (+14), whilst assaults on police
and emergency workers have also risen from 118 to 131 (+13) year on year.
There was 1 fatal road traffic collision within
West Dunbartonshire during Qtr. 3.  
Overall road casualties have seen a marginal
change from 44 to 42 compared to the PYTD.
Fatalities remain unchanged from PYTD
(n=2), serious injuries have reduced
marginally from 17 to 13 and slight injuries
have increased from 25 to 27. 
The end of the Covid lockdown appears to have impacted on the number of
incidents recorded in West Dunbartonshire where an adult concern has been
raised has reduced by 14.6% from 1403 to 1198 compared to figures recorded at
the end of Qtr 3 last year.  Child concerns have also shown a reduction of 7.7%
from 2987 to 2757.
ITEM 8 A
Page 51

Page 52

OFFICIAL 
OFFICIAL 
Empowered Residents
Safe (Communities)
Nurtured (Children &
Young People
Flourishing Local Economy Independent (Older People)
Violent Crime and Antisocial Behaviour
Crimes were largely split equally between public and private space. In approximately 72% of crimes occurring within private space the offender was known to the victim, while 35% of all public space crimes were committed by persons
known to the victim. Our CID officers continue to focus on the most serious crimes ensuring that all investigative opportunities are considered and explored as part of their investigations. Through analytical review and speaking with local
communities we focused our festive safety campaign on our town centres and night time economy. With additional Night Zone West funding we were able to provide an increased policing presence during peak times.  We engaged with
local licensees and ensured a proactive presence across all licensed premises during peak times. We increased our visibility in town centres and other hot spot areas reducing disorder. We continue to work closely with West
Dunbartonshire Council ASB teams and other registered social landlords providing support and information to identify and target problematic tenants and locations. Our Youth Engagement officers have undertaken joint emergency
services days within all secondary schools which was primary focused on ASB/ Knife crime and safety in the lead up to Guy Fawkes Night.  During Q3, 8 persons were charged for multiple fire raisings and vandalisms to local schools,
relevant information was shared with partners and appropriate intervention programmes identified.  There was only one significant incident linked to Guy Fawkes Night which was proportionately managed, all other reported ASB was
down on previous years. 
Public Protection 
Local policing continues to promote the multiple award winning “That Guy” campaign, its
positive approach in changing and challenging unacceptable male behaviours, not the actions
of victims. It is clear that there is an increased confidence in reporting sexual crime to Police.
We continue to work together to raise awareness of reporting mechanisms, support
measures and to encourage survivors of abuse to come forward and engage with services.
Our officers work proactively to highlight reporting mechanisms and danger signs from those
who wish to cause them sexual harm.   
Our Youth Engagement team had a Joint action plan with Trading Standards regarding
premises selling Vape products to school children. 
Acquisitive Crime 
The cost of living crisis will undoubtedly impact on acquisitive crime but we will continue to
engage with partners seeking opportunities to signpost and support our community.
The majority of recorded crimes appear to be both spontaneous and opportunistic. Analytical
work is ongoing to support a renewed focus and governance around the issue to improve
detection rates which have increased during quarter 3. All housebreaking reports are subject
to rigorous review to identify all evidential opportunities. It is anticipated that when forensic
updates are received a number of other opportunities to apprehend offenders will be
available.
Our Preventions team proactively seek out vulnerable premises and offer crime prevention
advice. This team also contacts victims of acquisitive crime offering support. They have
installed numerous call blockers and work closely with partners to share good practice and
identify local trends.  
We maximise the use of our social media to promote targeted local community advice. 
Vulnerable Persons 
Our Partnership team have engaged with third sector organisations to
collate a list of local support services and voluntary organisations. We
have used this information to provide additional training to our officers
in order that we can signpost the most vulnerable in our communities.
We have robustly policed domestic Bail conditions ensuring they are
being adhered to and where necessary arresting and reporting repeat
offenders. We continue to engage with partners to ensure the safety of
victims of domestic violence. We have maximised the use of social media
to promote our campaign on violence against women, signposting
victims of Domestic Abuse. We have also introduced a new Domestic
Abuse Safeguarding Team to ensure the best services to victims. 
We are delivering in our role as corporate parents in line with the
Scottish Government’s ‘Promise’ working with our Care homes to ensure
Looked After and Accommodated young people are not stigmatised or
treated differently to those not in care. We have introduced a new
missing person’s protocol specifically to support care experienced young
persons. 
In November we had a rise in suspected drug related deaths. Recognising
this we engaged regularly with various internal and external partners to
ensure that an effective and proportionate response was adopted and
that our front line officers were equipped with the skills and knowledge
to support and signpost those struggling with addictions. 
Serious and Organised Crime
West Dunbartonshire benefits from a dedicated Proactive Crime Team
(PACT). These specialist officers are supported by dedicated intelligence
officers in tackling serious and organised crime in our communities.
West Dunbartonshire has benefitted from a focussed approach in
tackling Serious and Organised Crime (SAOC), where national specialist
resources and officers will assist local officers in the detection and arrest
of those involved in the top echelons of serious criminality
One such example in December 2022 was the seizure of a 20 tonne
hydraulic press along with 224g of unknown white powder, suspected to
be a ‘cutting’ agent during a planned search at a property. This direct
proactivity is having a real impact on serious and organised criminality
within our community. 
Numerous other targeted drugs searches have taken place across our
community resulting in significant seizures of drugs, property and money.
Our specialist officers are utilising all available legislation and investigative
opportunities to target SAOC.   
Road Safety and Road Crime 
Road safety remains a priority. Road Policing officers carry out both high
visibility and unmarked patrols concentrating on the five main
contributory factors that cause serious road traffic collision, these are
Careless Driving, Drink and Drug Driving, Not wearing a seatbelt, using a
mobile phone and speeding. Drug driving detections are up 10.5% and
Drink driving detections are up 8.7% YTD. 
Forward Planning 
 New Dementia Safeguarding
initiative
 Improved MATAC Domestic Abuse
process
 Not at Home process  and
Corporate Parenting
improvements 
 Operation Ballaton and Water
safety initiatives 
 New Town centre Community
Officers 
Page 52

Page 53

West Dunbartonshire Performance Report
Q3 - 1st October 2022 - 31st December 2022
Annick
ITEM 8B
Page 53

Page 54

West Dunbartonshire Performance Report
Table of Contents
Local Fire and Rescue Service Plan Priorities 3
WestDunbartonshire Activity Summary   4
Domestic Safety - Accidental Dwelling Fires 5
Domestic Safety - Accidental Dwelling Fire Casualties 6
Unintentional Injury and Harm         7
Deliberate Fire Setting       8
Non-Domestic Fire Safety       9
Unwanted Fire Alarm Signals      10
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire   2   Page 54

Page 55

2 1 1 6 1 27
4 0 1 12 1 25
5 0 3 2 1 25
1 0 0 6 0 7
4 0 1 10 2 24
2 0 1 7 0 25
18 1 7 43 5 133
-33% -50% -36% -39% 25% 8%
-3% -56% -11% -17% -18% 8%
-6% 8% 16% 12% 16% 30%
Year on Year Change
3 Year Average Change
5 Year Average Change
Clydebank Central
Clydebank Waterfront
Dumbarton
Kilpatrick
Leven
Lomond
Total Incidents
Local Fire and Rescue Service Plan Priorities
Accidental
Dwelling
Fires
Accidental
Dwelling Fire
Casualties
Non-
Domestic 
Fire Safety
Unwanted
Fire Alarm
Signals
Unintentional
Injury and Harm
Deliberate
Fire Setting
The Local Fire and Rescue Service Plan has been developed to set out the priorities and objectives within West
Dunbartonshire and allows our local authority partners to scrutinise the performance outcomes of these priorities.      
We will continue to work closely with our partners in West Dunbartonshire to ensure we are all “Working Together for a
Safer Scotland” through targeting risks to our communities at a local level.
The plan has been developed to complement key partnership activity embedded across West Dunbartonshire`sCommunity
Plan and associated Delivery and Thematic plans. Through partnership working we will seek to deliver continuous
improvement in our performance and effective service delivery in our area of operations.
The Local Fire and Rescue Plan for West Dunbartonshireidentified six areas for demand reduction and is subject to regular
monitoring and reporting through the Police & Fire and Rescue Committee. A summary of the priorities and current activity
is detailed below with further detail and analysis contained within this performance report.
About the statistics within this report 
The activity totals and other statistics quoted within this report are published in the interests of transparency and
openness. They are provisional in nature and subject to change as a result of ongoing quality assurance and review.
Because all statistics quoted are provisional there may be a difference in the period totals quoted in our reports after
local publication which result from revisions or additions to the data in our systems. The Scottish Government publishes
official statistics each year which allow for comparisons to be made over longer periods of time.
Activity levels have reduced by more than 5%
Activity levels have reduced by up to 5%
Activity levels have increased overall
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire      3Page 55

Page 56

West Dunbartonshire Activity Summary
2018/19 2019/20 2020/21 2021/22 2022/23
117 129 161 110 77
57 56 56 80 92
169 179 192 207 200
343 364 409 397 369Total Incidents
All Special Services
All False Alarms
All Fires
0
100
200
300
400
500
2018/19 2019/20 2020/21 2021/22 2022/23
Total Incidents All Fires All Special Services All False Alarms
34%
16%
49%
21%
25%
54%
All Fires All Special Services All False Alarms
Incidents by Classification
Annual Average
5 Year Average
36.04%
9.49%
7.59%
7.59%
7.32%
6.23%
5.15%
3.52%
2.71%
2.44%
1.90%
1.63%
1.36%
1.08%
0.81%
False Alarm (UFAS)
False Alarm (Dwelling)
Refuse Fire
False Alarm (Good Intent)
SS - Flooding
SS - Effecting entry/exit
Dwelling Fire
Outdoor Fire
Special Service - RTC
Vehicle Fire
SS - Assist other agencies
SS - No action (not false alarm)
Other Building Fire
SS - Rescue/evac from water
SS - Medical Incident
Top 15 Incident Types by % of Total Incidents
West Dunbartonshire OperationalTrends
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
77
fires
primary &
secondary
special
services92
false
alarms
200
-3%
totalnumber of
incidents
369 -7%
-30%
fire & non-fire
casualties
9 -40%
economiccost of
ufas incidents
£262,010
Activityby Time of Day
15%
(-33) (12) (-7)
(-28) (-6)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                4Page 56

Page 57

-33% -3% -6%
Main Source of Ignition
Year on
Year
3 Year
Average
5 Year
Average
Domestic Safety - Accidental Dwelling Fires Domesti
Detection Present
88.9% 93.8%
Detection Actuated
Calls Made via Linked Alarms
77.8%
13
2 1 1 1
Cooking appliance Smoking
Related/Matches
Electricity supply Heating
equipment
Other domestic
style appliance
34
20
24
27
18
2018/19 2019/20 2020/21 2021/22 2022/23
66.7% 16.7%
38.9% 72.2%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage Only Nofire Damage
Alcohol/Drug Impairment
16.7%
Distraction
38.9%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
11.1%
Clydebank
Waterfront
22.2% 27.8%
Dumbarton
Kilpatrick Leven Lomond
5.6% 22.2% 11.1%
Clydebank
Central
Performance Summary
AccidentalDwelling Fires to Date
Main Source of Ignition
Accidental Dwelling Fires by Time of Day
Severity of Accidental Dwelling Fires
Human Factors
Automatic Detection & Actuation
AccidentalDwelling Fires Activity by Ward (% share)
(2) (4) (5)
(1) (4) (2)
(12) (3)
(7) (13)
(7) (3)
(16) (15)
(14)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                5Page 57

Page 58

-50% -56% 8%
Year on
Year
3 Year
Average
5 Year
Average
Domestic Safety - Accidental Dwelling Fire Casualties
Burns- Slight 100.0%
0.0%
0.0%
0.0%
0.0%
0 0
1
0 00 0 0 0 0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
100%
Female
0%
4
6
2 2
1
2018/19 2019/20 2020/21 2021/22 2022/23
Clydebank
Central
100.0%
Clydebank
Waterfront
0.0% 0.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 0.0% 0.0%
Unintentional Injury or
01 02 03
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
First Aid at Scene
Hospital -Serious Injuries
Hospital-Slight Injuries
Fatality
Performance Summary Fire Casualties by Time of Day
AccidentalDwelling Fire Casualties Year to Date
Nature of Injury
Extent of Harm
Age / Gender Profile
Accidental Dwelling Fire Casualties by Ward (% share)
(1) (0) (0)
(0) (0) (0)
(1) (0)
(0) (0)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                6Page 58

Page 59

-36% -11% 16%
Year on
Year
3 Year
Average
5 Year
Average
Unintentional Injury or Harm
Chest pain /
Heart condition
/ Cardiac arrest
Bruising
Drowning
Unconscious,
Other
physical
Not known
14.3%
14.3%
14.3%
14.3%
14.3%
28.6%
0 0
3 3
00 0 0
1
0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
86%
Female
14%
Clydebank
Central
Clydebank
Waterfront
14.3% 42.9%
Dumbarton
Kilpatrick Leven Lomond
0.0% 14.3% 14.3%
14.3%
Road Traffic Collision Water Rescue
Assisting Other Agencies
28.6% 14.3%
57.1%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00
First Aid at Scene
Hospital -Serious Injuries
Hospital -Slight Injuries
57.1%
0.0% 14.3%
Fatality
28.6%
17
10
7
11
7
2018/19 2019/20 2020/21 2021/22 2022/23
Deliberate
Performance Summary
Non-Fire Casualties Year to Date
Non-Fire Casualties by Time of Day
Nature of Injury
Extent of Harm
Non-FireEmergency Activity
Age / Gender Profile
Non-FireCasualties by Ward (% share)
(1) (1) (3)
(0) (1) (1)
(1)(2)
(2) (1)
(4) (0)
(4)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                7Page 59

Page 60

-39% -17% 12%
Year on
Year
3 Year
Average
5 Year
Average
Deliberate Fire Setting
Clydebank
Central
Clydebank
Waterfront
27.9% 4.7%
Dumbarton
Kilpatrick Leven Lomond
14.0% 23.3% 16.3%
14.0%
71
91
117
70
43
2018/19 2019/20 2020/21 2021/22 2022/23
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
22.5%
11.0%
17.1%
11.4%
14.0%
77.5%
89.0%
82.9%
88.6%
86.0%
2018/19
2019/20
2020/21
2021/22
2022/23
Primary Secondary
1
0
2
3
Other Buildings
Dwellings
Vehicles
Other Primary
25
12
Refuse
Other Secondary
343
364
409 397
369
55 81 97 62 37
0
200
400
600
300
350
400
450
2018/19 2019/20 2020/21 2021/22 2022/23
All Incidents Deliberate Secondary Fires
Non
Performance Summary
Deliberate Fires Year to Date
Deliberate Firesby Time of Day
Deliberate Firesby Classification
Primary Fire Ratio by Activity Type
Secondary Fire Ratio by Activity Type
Deliberate Fires Compared to Operational Activity
Deliberate Fires by Ward (% share)
(6) (12) (2)
(6) (10) (7)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                8Page 60

Page 61

25% -18% 16%
Year on
Year
3 Year
Average
5 Year
Average
Non Domestic Fire Safety
9 9 9
4
5
2018/19 2019/20 2020/21 2021/22 2022/23
Clydebank
Central
Clydebank
Waterfront
20.0% 20.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 40.0% 0.0%
20.0%
100%
Accidental Deliberate Not Known
80.0% 0.0%
100.0% 0.0%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage No FireDamage
2
1
1
1
Residential Home,
Retirement/Elderly
Retail, Hairdresser
Hospitals and medical care,
Hospital
Offices and call centres,
Converted office
Unwanted
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00Performance Summary
Non-Domestic Fires Year to Date
Non-Domestic Firesby Time of Day
Non-Domestic Fires by Nature of Origin
Non-Domestic Fires by Ward (% share)
Severity of Non-DomesticFires
Non-Domestic Fires by Premises Type
(1) (1) (1)
(0) (2) (0)
(4) (0)
(5) (0)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                9Page 61

Page 62

8% 8% 30%
Year on
Year
3 Year
Average
5 Year
Average
Unwanted Fire Alarm Signals
97 106 113 123 133
2018/19 2019/20 2020/21 2021/22 2022/23
Clydebank Clydebank
Waterfront
18.8% 18.8%
Dumbarton
Kilpatrick Leven Lomond
5.3% 18.0% 18.8%
20.3%
29
29
17
16
10
Education
Residential
Industrial
Retail
Hospitals and medical care
36%
UFAS Percentage Against all Incidents
UFAS Percentage Against all False Alarms
67%
Human Influenceand Alarm Activations
38.3%
0.0
1.0
2.0
3.0
Mon Tue Wed Thu Fri Sat Sun
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
Performance Summary
Unwanted Fire Alarm Signals Year to Date
Unwanted Fire AlarmSignals by Ward (% share)
Unwanted Fire Alarm Signals by Time of Day
Unwanted Fire Alarm Signals- Top 5 Premises
Unwanted Fire Alarm Signals Activity Ratios
Average UnwantedFire Alarm Signals per Day
(119)
(51)
(27) (25) (25)
(7) (24) (25)
(119)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                10Page 62

Page 63

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Housing and Employability
Committee: Housing and Communities Committee 22 February 2023
Subject: Housing and Employability Delivery Plan 2022/23 Interim Progress
1 Purpose
1.1 This report sets out the interim progress of the Housing and Employability
Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 The Housing and Employability Delivery Plan 2022/23 was presented to
Corporate Services Committee on 23 November 2022 with a commitment to
report interim progress and year-end progress in February and May 2023
respectively.
4 Main Issues
4.1 The Delivery Plan for 2022/23 was supported by an action plan of activities to
be delivered over the year. Appendix 1 details the progress on delivery of this
action plan. At this interim point, seven of the 28 actions have been
completed, 19 are progressing as planned and are anticipated to be
completed by 31 March 2023.  
4.2   Of the remaining actions, two actions have not been completed as planned; 
Deliver high rise accommodation strategy, is slighty adrift of schedule,
however it is anticipated this will be completed by May 2023; and
Development and implementation of the revised ASB strategy has, this is
being developed as a multi-agency approach and has therefore become more
challenging to achieve in year as originally anticipated; work will therefore
continue in 2023/24 to progress this to a completed status.
ITEM 9
Page 63

Page 64

4.3 The delivery plan also includes a set of PIs which measure progress against
the 2022-27 Strategic Plan objectives as well as key service areas. These will
be reported at year-end.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Housing and Employability may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Peter Barry
Service Area: Housing and Employability
Date: 7th February 2023 
_____________________________________________________________
Person to Contact:  Nicola Docherty
nicola.docherty@west-dunbarton.gov.uk
Appendices: Appendix 1: Housing and Employability Delivery Plan
2022/23 - Interim Progress of Actions
Page 64

Page 65

Background Papers: Housing and Employability Delivery Plan 2022/23 –
Housing and Communities Committee, 23 November
2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 65

Page 66

Appendix 1 H&E  22-23 Delivery Plan Interim Progress Report
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Action Status Progress Due Date Note Owner
Build community resilience and
advance community
empowerment including the
development of a training
programme to support the
Community empowerment agenda
31-Mar-
2023
The actions from the approved Community Engagement Strategy
(2019) are being delivered with oversight from the Community
Empowerment Project Board. Year 1 priority projects that are all well
underway. Projects include corporate mainstreaming approach to
Participatory Budgeting; Communication Plan; Review of Community
Asset Transfer and a programme of awareness raising and training to
Support the Community Empowerment Agenda. The projects ensure
community based work to continue to raise awareness of the
empowerment agenda and of the opportunities open to communities.
It should be noted that additional projects have been added to the
delivery plan incorporating the UKSPF investment, including the
development of the CCTV network. The Board have considered and
agreed Year 2 priority projects ensuring a focus on the Cost of Living
Crisis. In doing so the Delivery Plan will be up-dated regularly
highlighting progression. It is anticipated this action will be completed
by year end.
Clare
English
Continue to improve and develop
the Councils CCTV processes and
infrastructure
31-Mar-
2023
The Communities Team are included within the proposals for the
United Kingdom Shared Prosperity Fund (UKSPF) programme that will
deliver a series of actions from 2022 to March 2025. The primary goal
Clare
English
ITEM 9
Page 66

Page 67

Action Status Progress Due Date Note Owner
of the UKSPF is to build pride in place and increase life chances across
the UK. With a key theme being Communities and Place the investment
will allow for Improving Community Safety by upgrading of the current
CCTV system for public space surveillance to provide support in the
protection of the public, the deterrence of and the detection of crime
and to provide support in the investigation of such crimes.
Improvements will seek to link enhanced public space, social housing
and Council establishment cameras to one network with access from
one control centre. This action will go beyond the due date of March
2023 in line with the UKSPF allocation to 2025.Procurement route will
include a procured CCTV survey leading to a transmission strategy in
order to inform a tender. The CCTV Delivery group has been re-
established and will be directed by the Community Empowerment
Project Board.
Explore alternative forms of
funding to encourage less reliance
on mainstream council funding
31-Mar-
2023
The Communities Team are a key part of the proposals for the United
Kingdom Shared Prosperity Fund (UKSPF) programme that will deliver a
series of actions from 2022 to March 2025. The primary goal of the
UKSPF is to build pride in place and increase life chances across the UK.
These focus on: communities and place; capital projects; people and
skills and multiply (functional numeracy).
Within the communities and place category the West Dunbartonshire
plan will focus on: Improving Community Safety by upgrading of the
current CCTV  system for public space surveillance; Pride in Place
Project will focus on building on pride in place centred round a
Community Garden supporting neighbourhood and partnerships
working to reduce anti-social behaviour (Housing/ Fire Scotland/
Communities/ Police Scotland/ Greenspace; Participatory Budgeting -
Awareness /training resource;  West Dunbartonshire Pantry Network -
Clare
English
Page 67

Page 68

Action Status Progress Due Date Note Owner
community pantries offer a dignified and sustainable approach to
addressing food insecurity and food poverty; Community Soup
Engagement to develop small community-based projects that will
improve the quality of life in local areas. Equating to additional funding
of £744,222 for 2023 - 2025 and a commercial viable CCTV network.
Deliver the objectives set out in
the Community Empowerment
Strategy and Action Plan through
identified priority projects
31-Mar-
2023
The actions from the approved Community Engagement Strategy
(2019) are being delivered with direction from the Community
Empowerment Project Board. The Board agreed Year 1 and Year 2
priority projects that are progressing well including the completion of
the Participatory Budgeting Mainstreaming Pilot. It should be noted
that with the allocation of UKSPF, additional projects have been
included within the delivery plan; Pride in Place; Food Pantry network;
PB awareness; Community Soup and development of a CCTV network
upgrade by March 2025.The projects ensure community based work to
continue to raise awareness of the empowerment agenda and of the
opportunities open to communities.
The board agreed that priority projects ensure a focus on the Cost of
Living Crisis. In doing so the Delivery Plan will be up-dated regularly
highlighting progression. It is anticipated this action will be completed
by year end.
Clare
English
Lead on the Council’s approach to
Participatory Budgeting
Mainstreaming across the
organisation
31-Mar-
2023
The PB Mainstreaming pilot and evaluation have been successfully
completed. The team continue to encourage and embed a culture of
participation across the authority, with a PB ilearn module developed
for WDC staff use; Community Budgeting Six roll out; and establishing
PB spend and service champions across all WD service areas. HSCP PB
Clare
English
Page 68

Page 69

Action Status Progress Due Date Note Owner
budget for 2023/24 has been identified. It is anticipated this action will
be completed by year end.
Develop an Employee Volunteering
Policy to support the ambitions of
the Community Empowerment
(Scotland) Act 2015
31-Mar-
2023
An Employee Volunteering framework approach has been adapted as
the pilot progresses. The framework will link with the TU learning
agreement and offer employee volunteering as a learning opportunity,
work is ongoing lead by the Communities and Organisational
Development teams. A Pilot scheme will be developed by year end with
a launch date to be agreed by the Community Empowerment Board. It
is anticipated this action will be completed by year end.
Identify and implement
improvements in partnership
working between the CCTV team
and key partners to promote
feelings of safety in the area
31-Mar-
2023
Partnership working is well established with Police Scotland to promote
feelings of safety across the area, with the CCTV team being highly
commended for outstanding partnership working at the Police Scotland
-Argyll and West Dunbartonshire, Partner of the Year Awards in
December 2022. Work will continue to incorporate CCTV information
on the Twenty Minute Neighbourhood mapping system to support safe
routes for residents. The reestablishment of the CCTV working group in
line with the UKSPF will support progression of the action as the new
CCTV network develops. It is anticipated this action will be completed
by year end.
Clare
English
Development and implementation
of revised Anti-Social Behaviour
strategy
31-Mar-
2023
The development of the ASB strategy has been delayed due to
requirement for SAFE DIG partnership outcome document to be
produced by same group of members, however information from
partner services is being collated to prepare document meantime and
commitment agreed via Safe DIG that partners will contribute to
development of strategy.  Expected timescale for ASB Strategy will be
impacted due to this and requirement to conduct consultation period
once document collated. This action will therefore not be completed by
year end and will be carried forward to the 2023/24 action plan.
Nicola
Pettigrew
Page 69

Page 70

Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to secure community and partner buy-in for
the emerging Community Empowerment Strategy
and Action Plan.
In order to deliver on the ambitions of the
Community Empowerment Strategy and associated
action plan, it is vital that a partnership approach is
promoted to ensure best use of resources, skills and
expertise.
30-Nov-
2022
The risk profile will remain the same despite
significant progress being made with a number
of priority projects.
Clare
English;
Elaine
Troup
Failure to deliver on the capacity building of the
Community Empowerment (Scotland) Act.
As communities continue to recover from the
impact of Covid-19 there is an ever greater need to
support and develop communities. Community
capacity building and community development work
continues within existing resources.
30-Nov-
2022
The risk levels remain the same despite
significant progress being made to support
communities across the authority through
increased levels of capacity building.
Clare
English;
Elaine
Troup
Failure to deliver sufficient community capacity
building / community development support to
groups impacted by COVID-19.
COVID-19 has had a huge impact on communities
across the authority. A focused approach is needed
to understand the impact on community groups and
to support them to re-start and re-build. Failure to
do this would impact on the individual and
community resilience of citizens.
30-Nov-
2022
The Communities Team continues to support a
range of community organisations to re-start or
develop on the back of the pandemic. The team
have a dedicated capacity building resource
available to support.
Clare
English;
Elaine
Troup
Page 70

Page 71

Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Engaging positively with Residents, Communities &
Partnerships.
The risk that the Council fails to adequately engage,
establish and maintain positive relationships with
local residents and communities in addition to
partnership bodies.
30-Nov-
2022
Whilst the Community Planning Partnership is
currently being managed under a shared service
agreement, it is well established with strong
partnership working arrangements in place
reducing likelihood of this risk being realised.
We continue to promote and ensure strong
communications and engagement through the
Engaging Communities Framework. As well as
gathering resident feedback, we ensure that key
information is communicated through a variety
of media channels including online, social media
and publications such as Housing News.
Clare
English;
Elaine
Troup
Objective 3. Our residents are supported to increase life and learning skills
Action Status Progress Due Date Note Owner
Digital inclusion – progress the
opportunities for provision of wi-fi
infrastructure into new build
properties and priority areas of
deprivation
31-Mar-
2023
This action is progressing well. Digital inclusion capabilities are
incorporated into our new build design standard and all new housing
will benefit from this infrastructure.  We have connected with two
telecommunications companies in terms of the provision of social
tariffs for broadband connectivity and plans are in place to install
infrastructure across our housing estate. It is anticipated this action
will be completed by year end.
John Kerr
Page 71

Page 72

2. Our Environment
Objective 6. Our neighbourhoods are sustainable and attractive
Action Status Progress Due Date Note Owner
Develop and implement Housing
regeneration approaches to
improve our communities
31-Mar-
2023
This action is progressing as planned. Priority areas referenced in the
new local housing strategy, and an area based approach has been
launched from this which will cover the 5 year period of the strategy.
Some key initiatives that are underway include Clydebank East,
Pappert, Alexandria and Bellsmyre, Dumbarton. It is anticipated this
action will be completed by year end.
John Kerr
Develop our Housing Asset
Management to ensure
sustainability and deliver new
Housing Capital Investment
Programme
31-Mar-
2023
This action is progressing as planned. New Asset Management
Strategy in development, a draft will be available within the target
date and following detailed consultation will be submitted to a
Housing and Communities Committee in 2023. It is anticipated this
action will be completed by year end.
John Kerr
Implement  new Local Housing
Strategy & council wide response
to 2040
31-Mar-
2023
This has been successfully completed.  High level steering group
tasked with ensuring delivery continues to meet and prioritise key
objectives.  Scottish Government has now fed back views on the
strategy in a positive manner. The Annual progress action plan update
will be provided to the HAC.
John Kerr
Implement year 4 of rapid
rehousing plan (Home at the
Heart)
31-Mar-
2023
This action is progressing as planned. While we continue to roll out
the plan in a positive manner in respect of the key actions, delivery on
some of the key performance measures are not being realised as a
result of slower than anticipated housing access system and notably
John Kerr
Page 72

Page 73

Action Status Progress Due Date Note Owner
around void turnaround times. It is anticipated this action will be
completed by year end.
Deliver New build Housing
programme 31-Mar-
2023
This action is progressing as planned. Positive progress continues to
be made, with the completion of the Queens Quay development in
22/23, and anticipated site starts at Clydebank East and Pappert. It is
anticipated this action will be completed by year end.
John Kerr
Deliver high rise accommodation
strategy 31-Mar-
2023
This action has made significant progress. We have consulted with
tenants and residents and will incorporate the outcome of the
consultation into the new strategy to promote high rise living across
West Dunbartonshire, the Strategy will be presented to HAC in May
and therefore will not be completed within year. The Strategy will still
remain a priority.
John Kerr
Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
The public space CCTV infrastructure covers the three main
townships of Alexandria, Dumbarton and Clydebank with a
mix of fixed space and redeployable cameras. Until
resources can be secured and improvements made the
Council does remain at risk from reputational damage,
should the system fail.
30-Nov-
2022
CCTV investment to upgrade the
current network is a key element of the
UK Shared Prosperity Funding applied
for through the Theme - Communities
and Place. A decision on the
Investment Plan focus is due in October
2022.
Clare
English;
Elaine
Troup
Failure to achieve the outcomes of the Scottish Social
Housing Charter.
The Scottish Social Housing Charter sets out the standards
and outcomes that tenants and customers should expect
30-Nov-
2022
Areas of non-compliance (SHQS) will be
highlighted within Annual Assurance
process.
John Kerr
Page 73

Page 74

Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
from social landlords, in terms of the quality and value for
money of the services they receive. Failure to continue to
meet these could place the Council at risk of the
intervention powers of the Scottish Housing Regulator
3. Our Economy
Objective 7. Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Action Status Progress Due Date Note Owner
Develop investment plan for
shared prosperity fund
31-Mar-
2023
This action is progressing as planned. The UK Shared Prosperity Fund
(UKSPF) is the UK Government’s main method replacing for EU
Structural Funds and has a potential value to West Dunbartonshire of
£3.8m. The fund has three core investment priorities that will be
funded on the basis of an Investment Plan.  West Dunbartonshire
worked in partnership with Glasgow City Region Partners to develop
and submit a Regional Investment Plan in September.  The final
decision on the funds allocated to West Dunbartonshire will depend on
the outcome of the UK Government assessment of the Regional
Investment Plan.  A committee report has been endorsed at the IRED
Committee and the Housing and Communities Committee; an
accompanying Equality Impact Assessment has also been prepared.
The next stage, following, award notice will be the preparation for
delivery. This will include the development of grant fund opportunities
Stephen
Brooks
Page 74

Page 75

Action Status Progress Due Date Note Owner
and processes for acquiring/procuring the services we require to meet
the SPF aims.
Objective 8. We will support our residents to access employment and training opportunities
Action Status Progress Due Date Note Owner
Ensure no one left behind by
supporting skills and learning
for work, life and learning
31-Mar-
2023
This action has been successfully completed. We have established a
three year CLD plan with associated actions and activities that are
designed to support skills for life, learning and work. This includes: the
delivery of community based vocational courses that are accredited by
SQA; supporting digital skills; and assisting the delivery of ESOL (English
for Speakers of Other languages). In addition we are developing a
proposal for Multiply activities (Adult numeracy) to include in our plans
for the use of UK Shared Prosperity Funds.
Stephen
Brooks
Promote inclusive growth
through access to training and
apprenticeship opportunities
31-Mar-
2023
This action is progressing as planned. There are 122 MA's supported
through the W4U SDS MA programme over this period. They are
actively being supported through their Apprenticeship by W4U who
commenced their MA in previous years - some MA's can take up to 4
years to complete - for example construction related apprenticeships.
The apprentices are combination of MA's within the Council and Private
Sector, as well as upskilling opportunities offered to existing council
employees in Childcare, Business Admin, Digital Analytics and Social
care sectors.
Stephen
Brooks
Page 75

Page 76

Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to prepare for changes associated with No One Left
Behind.
No One Left Behind represents a transformational change in
employability service provision, failing to prepare and reaching
a state of readiness will lead to lost opportunities for
investment in employability services.
30-Nov-
2022
We have complied with the
relevant guidance in relation to
the delivery of No One Left
Behind; a new approach to
employability service provision.
As such, the impact and
likelihood remain low.
Stephen
Brooks
Objective 9. We will work with partners to support economic development to deliver increased prosperity for our area
Action Status Progress Due Date Note Owner
Support and implement CLD,
Employability and Welfare
benefit three year plans to
promote  quality frameworks
and partnership working to
enhance work, learn, money
service provision
31-Mar-
2023
This action has been successfully completed. We have completed the
three year plans for CLD, Information and Advice Services and
Employability Services. Each plan has a set of actions that focus on
continuous improvement that we will monitor on an ongoing basis.
Allied to this are a set of service activities with associated performance
indicators. These reports will be used to gauge progress and provide
evidence for the various quality standard assessments.
Our three year employability plan has been endorsed by the Scottish
Government and will serve as a guide for the use of No One Left
Behind resources. This plan will also inform the development of our
proposals for UK Shared Prosperity Funds 'People and Skills' priority.
Meanwhile the CLD Plan will inform our approach to UK Shared
Prosperity 'Multiply' objectives.
Stephen
Brooks
Page 76

Page 77

Action Status Progress Due Date Note Owner
These plans were used to inform the local child poverty annual report
which was circulated to the key stakeholders (Council, Community
planning, NHS Greater Glasgow and Clyde) in September.
Maximise income from
employment
13-Mar-
2023
This action is progressing as planned. We are delivering support
through the use of European Social Funds, No One Left Behind and
Parental Employability Support. These funds are intended to improve
people's prospects by developing confidence, self-esteem, skills and
understanding of the labour market. As such progression towards the
labour market is a key indicator. Nevertheless we have supported
approximately 200 people to secure employment in the first half of
the current financial year (22/23). This is consistent with our overall
aim of supporting 390 people to secure employment over the course
of the year.
Stephen
Brooks
Maximise income from benefits 13-Mar-
2023
This action is progressing as planned. We continued to deliver services
through the period of health restrictions. We are now developing a
hybrid service, face to face/home visits and remote on-line support,
that draws on the experience and lessons learned during covid. We
have established a target of supporting people to secure £7.9m of
additional income and this takes into account our approach, our
resources and the likely level of demand.  Nevertheless, in the first half
of the current year we are on track to meet our annual target.
Stephen
Brooks
Ensure no one left behind by
addressing life challenges and
reducing costs
13-Mar-
2023
This action has been successfully completed. We are reviewing our
activity and associated targets in the light of our experience of service
delivery during and beyond COVID-19 restrictions. In addition, we are
also reviewing how we gather information to demonstrate how we
support people to reduce costs by managing debt. We have set an
interim target while we review the approach and in the first half of the
Stephen
Brooks
Page 77

Page 78

Action Status Progress Due Date Note Owner
current financial year we have supported our service users to manage
approximately £906,377 of debt.
In addition, we are developing approaches as part of the aim to
address the cost of living crisis. This includes supporting local food
banks to develop their services and address food insecurity. We are
also supporting activity to address fuel poverty through our Improving
the Cancer Journey project, family opportunity hub and information
and advice partnership.
Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to respond to child poverty legislation.
Failure to respond will have a significant impact on the
Council’s reputation, more importantly an opportunity to
raise issues and respond more effectively to child poverty
issues will be lost
30-Nov-2022
We have complied with the
guidance for the production of
local child poverty reports. We
have also reviewed the new
national plan and we are in a
good position to compile the
2022 plan as required. 
Stephen
Brooks
Universal Credit Full Service changes breadth and depth of
demand for services.
Migration of all claims to Universal Credit may lead to
increased service demand from people who would not have
used Working 4U service otherwise. Including those requiring
assistance to meet the digital by default requirement; those
seeking to maintain their claim through increased
30-Nov-2022
The risks associated with the
migration to Universal Credit
were mitigated as part of the
response to Covid-19. During
the pandemic, access was made
easier overcoming some of the
challenges associated with the
Stephen
Brooks
Page 78

Page 79

Risk & Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
employability service requirement; and the need to improve
IT skills.
The process has been intensified as a direct result of covid-19
and the associated relaxation of the rules has reduced the
risk of increased demand from this source. 
waiting period for U claimant
first payments.
Failure to secure alternative funds to replace European
funding.
Failure to identify alternative funds to replace European
Structural funds will increase uncertainty and loss of staff to
other services
30-Nov-2022 An investment plan has been
submitted to the UK
Government and is being
assessed. We will receive
notification of the review at the
end of October.
Stephen
Brooks
The cost of living crisis will lead to a substantial demand for
access to welfare/debt support services.
We will monitor the changing levels of demand and target
our resources to individuals and areas that are most in need.
We will seek to work with partners to ensure we receive
appropriate referrals who can benefit from our support.
30-Nov-2022 We are working to ensure we
focus our efforts on those most
affected by the cost of living
crisis. This includes managing
food insecurity and fuel debt
funds.
Stephen
Brooks
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Page 79

Page 80

Action Status Progress Due
Date Note Owner
Develop and implement
wellbeing, employee
engagement, equality and
training plans to enable
capabilities, improved resilience
and promotion of a diverse
workforce.
31-
Mar-
2023
Progress has been made across the H&E strategic team. Be the Best
conversations are in place. Staff are encouraged to engage with the
Trickle platform and discussions are underway for a wider rollout
across the full Housing Operations service with HR and seeking
Champions to help roll out within service area. W4U have carried out a
training needs assessment across the teams and are liaising with the
relevant training providers.
Be the Best conversations continue to be progressed with all staff and
reoccurrence dates set up to ensure ongoing process.  Focus incudes
wellbeing, support, and discussions around workload and is being
supported with training matrix completed by staff, any training
requirements needed will be arranged from this as needed. Housing
Operations employee survey completed November 2022, in addition
service.  Housing Operations staff newsletter issued Jan 2023, provides
overview of key areas of performance, developments and information
for staff within service, part of which seeks ideas/suggestions from
staff on developments to service.  Housing Operations improvement
plan shared with teams following from staff survey Nov 22 and staff
encouraged to input to items included for development
Communities Staff will be encouraged to continue their professional
development with all opportunities being logged in line with HMIe -
How Good is our CLD? Practice. Staff have completed EQIA training in
2022 and relevant teams are developing skills to support the inclusion
of UNCRC actions within their work plans. Forthcoming UKSPF
investment in the CCTV network will require training and development
for teams involved. The Housing Development and Homelessness
Team include training needs assessment as part of the be the Best
Peter Barry
Page 80

Page 81

Action Status Progress Due
Date Note Owner
conversations and these outputs have led to the development of the
proposed Housing Academy to further boost housing professionalism
within the service area.
Develop and implement
employee life cycle plans in line
with the People First Strategy to
attract and retain the workforce
31-
Mar-
2023
This action is progressing well. A Training matrix with staff for
completion and will be linked to scheduled Be the Best conversations
to identify required training and job shadowing needs for individual
staff, discussions with staff and Team Leaders.  W4U have reviewed
accreditation needs of teams to ensure continuing professional
development in in place. Training plans are developed for all Housing
development and homelessness team members, the identification of
professional qualifications for all staff is also supported.
Peter Barry
Implement service review
process including role design, use
of new technology and new ways
of working to add resilience,
address gaps, and establish
opportunities for efficiencies
31-
Mar-
2023
This action is progressing well. The Void working group continues to
meet 6 weekly and has implemented improved processes to aid void
management, including new KPIs, enhanced void phases and finalising
void performance dashboard to support staff operationally.
Digital opportunities are in progression for wider development of self-
serve portal for allocations in New Year with IHMS team.  Housing
Operations and IHMS Officer working group met January 2023 28 day
processes identified as first area for development and work is
underway to pilot before year end.  Once initial pilot undertaken wider
rollout of this area will across all Housing Officers/Assistant Housing
Officers and further areas of service will follow in conjunction with
staff/IHMS team to commence work on mobile app.
Communities’ team are adopting the Scottish Approach to Service
design in key areas of their work. This will simplify their work streams
Peter Barry
Page 81

Page 82

Action Status Progress Due
Date Note Owner
allow for collaboration with partners and establish opportunities for
efficiencies. Advice Pro Management Information system continues to
be developed in line with CLD/HMIE audit requirements. W4U have
begun review of services in line with successful funding awards.
Housing Development & Homelessness continue to assess the
strength of service delivery and review practices.  The further
development of our QL system is leading to improvements in other
service areas and we will follow that pathway to further improve
housing asset management and homelessness.  Elements of the
service are also governed by regulatory bodies and we regularly assess
compliance with a number of governance standards.
Develop and implement training
plans and development
opportunities to improve
capabilities and resilience within
the workforce.
31-
Mar-
2023
This action is progressing well, and is a key element of 1-2-1 and be
the best conversations, the introduction of our housing academy will
also deliver positive outcomes in terms of this action. Caretaking
working group has agreed online training for Caretaking staff which is
progressing within team.  The Communities’ team and W4U will be
involved in a review of the CLD competencies. Registration of CLD
standards council will be promoted. Working practice continues to be
developed to ensure compliance with CLD/HMIE audit requirements.
Peter Barry
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Status Progress Due Date Note Owner
Carry out review of housing
policies and processes across
31-Mar-
2023
This action has been successfully completed. The void working group
has been established and meets 6 weekly, range of processes have
Nicola
Pettigrew
Page 82

Page 83

Action Status Progress Due Date Note Owner
housing management areas
including void management and
re-let standards
been reviewed in line with Fit For Future recommendations.  Options
paper presented to HIB with recommendations for revised re-let
standards will be further discussed at WDTROA Range of short term
working groups established across Housing Operations service areas
and undertaken review of existing operational processes with staff.
Objective 12. Our residents are engaged and empowered
Action Status Progress Due Date Note Owner
Explore digital opportunities to
develop housing management
customer service and experience
(such as mobile app and Near Me
technology)
31-Mar-
2023
This action is progressing as planned. Housing Officers have
now returned to generic model, with some retained centrally
to focus on voids.  Digital opportunities are in progression for
wider development of self-serve portal for allocations in New
Year with IHMS team.  Housing Operations and IHMS Officer
working group met January 2023 28 day processes identified
as first area for development and work is underway to pilot
before year end.  Once initial pilot undertaken wider rollout
of this area will across all Housing Officers/Assistant Housing
Officers and further areas of service will follow in conjunction
with staff/IHMS team to commence work on mobile app. 
Nicola
Pettigrew
Action Status
Cancelled
Overdue
Page 83

Page 84

Not on track
In Progress and on track
Completed
Risk Status
Alert
High risk
Warning
OK
Unknown
Page 84

Page 85

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Supply, Distribution & Property 
Committee: Housing and Communities Committee 22 February 2023
Subject: Supply, Distribution & Property Delivery Plan 2022/23 - Housing Asset
& Investment and Building Services.
1 Purpose
1.1 This report sets out the interim progress of the Housing Asset & Investment
and Building Services priorities within the Supply Distribution & Property
Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 The Housing Asset & Investment and Building Services priorities contained
within Supply Distribution & Property (SD&P) Delivery Plan 2022/23 was
presented to Housing and Communities Committee on 23 November 2022
with a commitment to report interim progress and year-end progress in
February and May 2023 respectively.
4 Main Issues
4.1 At this interim point of the year, all of the eight actions are progressing as
planned and are on track for completion by 31 March 2023 Full details of
progress are set out in Appendix 1.
4.2 The delivery plan also includes a set of PIs which measure progress against
the 2022-27 Strategic Plan objectives as well as key service areas. These will
be reported at year-end.
5 People Implications
5.1 There are no direct people implications arising from this report.
ITEM 10
Page 85

Page 86

6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to SD&P including Housing Asset &
Investment and Building Services may have a direct impact on the delivery of
the Council’s Strategic Plan. It is essential that remedial action is taken to
ensure strategic delivery plans achieve the commitments detailed and
approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Angela Wilson
Service Area: Supply, Distribution & Property
Date:  23 January 2023
_____________________________________________________________
Person to Contact:  Karen Connelly
E-mail: Karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: SD&P Delivery Plan 2022/23 - Housing
Asset & Investment and Building Services Interim
Progress of Actions
Page 86

Page 87

Background Papers: SD&P Delivery Plan 2022/23 – Housing Asset &
Investment and Building Services; Housing and
Communities Committee 23 November 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 87

Page 88

Appendix 1; SD&P (Housing Asset & Investment and Building Services) Delivery
Plan 2022/23 - Interim Progress
2. Our Environment
Objective 6. Our neighbourhoods are sustainable and attractive
Action Status Progress Due Date Note Owner
Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality
Standard and reduce the number of properties
held in abeyance.
31-Mar-
2023
The main action related to all work streams contributing
to SHQS compliance and in general are progressing well.
However one of the key areas contributing to the drop in
compliance was in relation to Electric Installation
Condition Report (EICR) being valid in all properties.
There has been significant challenges with the EICR
completions in relation to access to properties. Building
Services are working with their specialist contractor in
attempts to improve this. This is currently projected to be
50 % compliant by end of Mar 23 increasing to 70 - 80%
by end of Aug 23.
Alan Young
Deliver the HRA Capital Investment programme
for 2022/23
31-Mar-
2023
Capital programme projects are progressing well, some
meeting or exceeding targets, others were behind mid-
year target position. Efforts to improve these are being
actioned. More detailed reports are provided regularly to
Better Homes and Housing Investment Board (HIB). It is
anticipated this action will be completed by year end.
Alan Young
Ensure the Council’s Housing stock progresses
towards the achievement of the energy
efficiency standard for social housing.
31-Mar-
2023
Energy Efficiency Standard for Social Housing (EESSH)
projects are progressing well, contributing to an increase
in homes meeting the energy efficiency standard. This is
Alan Young
ITEM 10
Page 88

Page 89

Action Status Progress Due Date Note Owner
reconciled at year end. It is anticipated this action will be
completed by year end.
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to deliver medical
adaptations in agreed
target timescales
This is monitored to ensure target
timescale of 79 days average for
housing medical adaptations is
adhered to ensure satisfaction with
the service and support those in
need of this service.
16-Dec-2022
Good in-year progress and cleared
many legacy applications, however
overall average days number will
still be high due to older jobs
completing.
No change to risk matrix.
Alan Young
Failure to maintain
Housing Stock
The risk that Council’s Housing
Stock are not fully fit for purpose
with consequent adverse impact
on our ability to deliver efficient
and effective housing for Council
tenants.
16-Dec-2022
Full programme of maintenance and
upgrade in place, with regular
monitoring and reporting.
No change to risk matrix.
Alan Young
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Status Progress Due Date Note Owner
Develop and implement wellbeing,
employee engagement, equality
and training plans to enable
capabilities, improved resilience
31-Mar-2023
Progressing as planned. Regular updates, 121/Be the Best meetings
take place with Housing Asset & Investment Team and Building
Services. Discussions on any training needs or aims are held with
staff and considered where appropriate training or budget is
Alan Young;
Martin Feeney
Page 89

Page 90

Action Status Progress Due Date Note Owner
and promotion of a diverse
workforce.
available. Scheduled or cyclical training is carried out via iLearn
portal. Building services are focusing on wellbeing in the service to
reduce absence levels and have implemented changes in recruitment
process to build resilience in teams. We will introduce a pilot of
condensed / flexible working in April 2023. It is anticipated this
action will be completed by year end.
Develop and implement employee
life cycle plans in line with the
People First Strategy to attract
and retain the workforce.
31-Mar-2023
Progressing as planned. Periodic review of workforce is undertaken in
consideration of current workload demands. The age profile of the
current staff may present workforce sustainability issues in the
coming years and workforce planning is vital. The current review of
Building Services will provide improved services and employee
satisfaction levels including review of role profiles. It is anticipated
this action will be completed by year end.
Alan Young;
Martin Feeney
Implement service review process
including role design, use of new
technology and new ways of
working to add resilience, address
gaps, and establish opportunities
for efficiencies
31-Mar-2023
Progressing as planned. We continue to review service delivery and
utilise where appropriate flexible working from home/remote/mobile
work styles for service resilience, utilising IT equipment solutions to
deliver their roles effectively and efficient. New technologies
including IHMS are being developed resulting in in-service
improvements. While roles within Building Services are
predominantly front line, flexible working arrangements are in place
across various teams. It is anticipated this action will be completed
by year end.
Alan Young;
Martin Feeney
Develop and implement training
plans and development
opportunities to improve
capabilities and resilience within
the workforce.
31-Mar-2023
Progressing as planned. Discussions on any training needs or aims
are held with staff and considered where appropriate. Scheduled or
cyclical training is carried out via iLearn portal. Statutory training is
being delivered as planned ensuring services meet all regulation and
regulatory obligations. Consultations are ongoing with TUs and
workforce in relation to workforce planning, multi-skilling, operating
hours etc. to improve efficiency, resilience and satisfaction levels. It
is anticipated this action will be completed by year end.
Alan Young;
Martin Feeney
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Page 90

Page 91

Action Status Progress Due Date Note Owner
Implement improvement plan for Building
services – Phase 2
31-Mar-
2023
Action is on track. Phase 1 of the restructure of Building
Services is complete and phase 2 is progressing. All craft
role profiles have been reviewed and await review by Job
Evaluation Panel. The stores/ workshop services review is
progressing. A survey has being carried out to gain team
members ideas on service areas for improvement and a
workgroup set up to consider feedback as part of the
phase 2 review. Progress is also being made on ensuring
services gaps are addressed. The new management team
are leading change to improve service and this will be
evidenced by improved performance and increased
customer satisfaction levels. It is anticipated this action
will be completed by year end.
Martin Feeney
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to implement
improvement plan to
ensure Building Services
are fit for purpose
The implementation of the
improvement plan will enhance the
effectiveness, efficiency and best
value of Building Services
20-Jan-2022
Good progress continues to be
made with actions in Building
Services Improvement Plan. Phase
1 of the review of Building Services
structure has been completed and
phase 2 is progressing.
Due to the continued progress the
risk assessment has reduced in both
likelihood and impact. Risk matrix
reduced from 3x3 to 2x2
Martin Feeney
Failure to implement
IHMS system across
building services
The effective implementation of
the IHMS system will delivery
efficiency, improve case tracking,
capture customer satisfaction and
improve service delivery.
20-Jan-2022
Good progress has been made on
Building Services IHMS
improvement action plan. Various
workgroups meetings continue to
review the use of the system
identifying and implementing
changes required. All team
members now have new mobile
devices, various amended and new
processes have been implemented,
Martin Feeney
Page 91

Page 92

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
improvements in stock management
processes are in place, new and
amended management information
reports have also developed and
introduced within Building Services
in 2022/2023 year to date. Work
continues on the wider cross
services IHMS improvement plan,
but are not reported within this risk
matrix.
The risk matrix has been changed to
capture improvement. 
Failure to meet citizen
expectation and service
standards
Risk of citizen dissatisfaction due
to us not doing what we say we
will when we say we will or not
completing required works first
time.
20-Jan-2022
Customer satisfaction is showing
gradual improvement year to date.
The service continues to reduce the
number of active repairs and the
percentage of these that are out
with their target times. Tenants /
customers are indicating in their
feedback increased satisfaction.
Improvement actions continue.
No change to risk matrix at this
time.
Martin Feeney
Failure to demonstrate
robust financial and
productivity systems
within building services
The development of new costing
model will mitigate against this
financial risk. Process change and
review will improve the system for
charging of works
20-Jan-2022
Regular finance meetings continue
where the financial processes,
system data management,
performance including effective
work planning and productivity are
monitored, scrutinised and where
necessary improvements actions
agreed. Open Book Recharge (OBR)
has been very successful in
ensuring regular and appropriate
levels of recharges are processed in
Martin Feeney
Page 92

Page 93

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
line with work completed and
income projections. OBR allow
improved visibility of service costs
which improves client / contractor
corroboration and scrutiny to
promote improved efficiency and
value for money services.
Due to the continued improvements
the risk assessment has reduced in
impact. Risk matrix reduced from
3x2 to 2x2.
Action Status
Cancelled
Overdue
Not on track
In Progress and on track
Completed
Risk Status
Alert
High risk
Warning
OK
Unknown
Page 93

Page 94

Page 94

Page 95

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 22 February 2023
__________________________________________________________________
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme 
1. Purpose
1.1 This purpose of this report is to provide the Housing and Communities
Committee an update on progress with West Dunbartonshire’s More Homes
Programme which oversees the delivery of the Council’s new home building
programme.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach
including the practical completion and handover of the latest development
project at Queens Quay (Site B);
(ii) Note the commencement of groundworks at the Clydebank East housing
development in January 2023; and
(iii) Note the delay in the acquisition of the former Clydebank Health Centre
site at the cost of £707,400 from NHS Greater Glasgow and Clyde for the
delivery of new Council homes
3. Background
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which was initially tasked and has successfully delivered over 1000 new
affordable homes in West Dunbartonshire by 2022 and includes the Council’s
own ambitious New House Building Programme.
3.2 The Council’s latest practical completion took place at the Queens Quay
development in September 2022 delivering 29 new Council homes in a key
regeneration area as part of a wider development which has delivered 146
new social rented homes.  These are first residential properties to be heated
from the Council’s Queens Quay District Heating Network.
ITEM 11
Page 95

Page 96

3.3 These 29 new homes, are in addition to the completion of the Council’s first
fully dementia designed development at Creveul Court, Alexandria and other
exemplar developments in Haldane, Aitkenbar, Bellmsyre, Dumbarton
Harbour and St Andrews, Clydebank.  The Council have now completed 12
new build developments since 2013 and are the largest developer of social
homes in West Dunbartonshire delivering 496 new homes to date as outlined
in Table 1 below:
Table 1:  Completed Council New Build
Project No. of
Units
Completion
Date
Granville Street (Phase 1), Clydebank 24 July 2013
Miller Road, Alexandria 15 October 2013
Granville Street (Phase 2), Clydebank 9 February 2014
Central Bellsmyre, Dumbarton 36 December 2014
Hillstreet Square, Dumbarton 37 August 2015
Second Avenue, Clydebank 40 April 2018
Creveul Court, Alexandria 22 April 2021
Aitkenbar Primary School 55 July2021
Haldane Primary School 58 August 2021
St Andrews, Clydebank 126 October 2021
Dumbarton Harbour, Dumbarton 45 December 2021
Queens Quay, Site B, Clydebank 29 August 2022
Totals 496
3.4 The Strategic Housing Investment Plan (SHIP) 2023-2027, outlining West
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach was approved by the Housing and
Communities Committee in November 2022. The SHIP outline plans to meet
the new Council Administration’s aim of delivering 2500 new affordable and
social rented homes over the next 10 years.
4. Main Issues
More Homes West Dunbartonshire - Delivery Programme
4.1 Building new affordable homes has an important role to play in revitalising
local economies and assisting with post-pandemic recovery plans.  It is also
clear that the need for affordable homes has and will increase in the current
economic environment. Our More Homes West Dunbartonshire approach is
an ambitious plan that aims to continue the positive momentum of the delivery
of much needed Council homes in West Dunbartonshire and will significantly
assist the Council’s aim to deliver 2500 new social and affordable homes by
2032.
4.2 As the biggest affordable housing developer in West Dunbartonshire, the
Council has identified a number of future development sites for new council
homes to address existing and new housing need. The design of these homes
will further develop, improve and exceed current best practice, providing
sustainable homes using innovative technology and delivering on our low
carbon ambitions including passivhaus and other net zero carbon
opportunities.
Page 96

Page 97

4.3 The Strategic Housing Investment Plan and HRA Capital Plan outlined the
plans the Council have for meeting their new build ambitions.  Some of the
initial plans were and continue to be impacted as a result of global issues
revised new build targets for the Council are outlined below:
Table 2: Council New Build Programme
*Current Planning figures
4.4 Updates for each site are noted below:
Clydebank East: 
Works commenced on this development on 23rd January 2023, as reported to
the Housing and Communities Committee in November 2022 the initial
programme will be the remedial works and external drainage, a construction
site start is programmed for May 2023.  The total programme for the works
will be 116 weeks.
The development at Clydebank East will see the completion of a major
housing led regeneration of a key priority area identified in the Local Housing
Strategy and will be the Council’s first fully zero carbon housing development
and marks a significant milestone in our transition to net zero approved at the
August 2022 meeting of the Housing and Communities Committee.
Site/Developer Number of
Units
Number of
Specialist
Provision
Est Site
Start
Est Completion
Date
Clydebank East,
Clydebank 88 9
January
2023
Spring 2025
Mount Pleasant 25 25 March
2023
Summer 2024
Pappert, Bonhill
Alexandria 27 3
October
2023
Autumn 2024
Dennystoun
Forge
20 20 April 2024  Autumn 2024
Willox Park 17 17 June 2023 Summer 2024
Bonhill Gap Sites* 35 4 July 2023 Winter 2024/25
Bank Street,
Alexandria
20 20 Autumn
2023
Winter 2024/25
Queens Quay
Site C
100 10 Autumn
2023
Spring 2025
Clydebank Health
Centre*
38 5 Autumn
2023
Spring 2025
Clydebank Gap
Sites*
50 10 Spring
2024
Summer 2025
Buyback Scheme
(50 per year)
250 25 2023/24 2027/28
670 units 148 units
Page 97

Page 98

Mount Pleasant, Old Kilpatrick
The demolition of the former care home at the site completed in December
2022 ahead of schedule.
We have had an initial consultation with the Old Kilpatrick Community Council
where we presented our concept of providing between 25 units of housing in a
similar style to Creveul Court, one and 2 bedroom flats and terraced 1 / 2
bedroom terraced cottages with private gardens.
An Employers Agent (NBM) have been appointed for this project, they were
previously the EA for the recently completed Queens Quay development.  The
construction procurement strategy is well advance and we intend to appoint a
design and build contractor in the next couple of weeks.
Pappert, Bonhill
The development of 27 new homes comprises 7 Passivhaus homes and 20
homes meeting the net zero ready standard. 
House Type Sustainability Standard Number of New
Homes
House 3bed/4 person Passivhaus 4
House 3bed/5 person Passivhaus 3
House 3bed/5 person Net Zero 6
House 4bed/6person Net Zero 4
House 4bed/7person Net Zero 1
Flat 2bed/3person w/c Net Zero 3
Flat 1 bed/2person Net Zero 6
We have commenced preplanning consultation in advance of submitting a
formal planning application, however we don’t anticipate planning approval
now until October 2023.  This development is also subject to a funding
application to the Scottish Government’s Vacant and Derelict Land Fund
which we expect to hear the outcome in February.
We have visited the site with housing officers who will assist in some pre
consultation with adjoining residents, schoolchildren and the Bonhill
Community Garden, the focus of the consultation will be the provision of
future play.
Dennystoun Forge Gypsy/Traveller Site
A submission was made to the Scottish Government for support funding from
their Gypsy/Traveller Accommodation Fund for significant improvements to
the Dennystoun Forge site, including new energy efficient chalet type
accommodation following a consultation exercise with site residents.
However, we were notified that this submission was unsuccessful at this point.
We have since engaged the Scottish Government following the outcome of
Page 98

Page 99

this and are providing more information in terms of our application, this will
allow our proposal to be reassessed and has the potential to achieve the
funding award.  This will be determined over the next few months 
Willox Park, Doveholm, Dumbarton
All demolition works are now complete with Practical Completion Certificate
issued to contractor. The site has been secured in anticipation of the
construction phase of the development.
A procurement strategy has been completed to appoint a number of
development consultants to progress the design to a full planning application
Bonhill Gap Site Strategy
A pre-planning application on the development of the 4 gap sites has been
made, and a procurement strategy is now in place.
Bank Street, Alexandria
The council is currently developing a proposal for 20 sheltered/amenity
housing units in partnership with the HSCP. This will include an options
appraisal in terms of the existing provision within the local area.
There are a number of infrastructure constraints within the site including a
main sewer which may affect the viability of the site. We are currently working
on pre-planning drawings for submission in early 2023 based on the
conclusion of the discussions with HSCP.
Queens Quay, Site C, Clydebank
The Council is currently developing a design to deliver a projected 20 units on
this site to complement the housing mix within sites A and B.  This
development will also be designed to meet low/zero carbon principles and
linked to the Queens Quay district heating network
.
Pre-planning response was received on the 25th February highlighting
concern of the WDC development proceeding in isolation. We have adopted
a, proactive response to this issue and have developed masterplan diagrams
incorporating the surrounding sites and have instructed the District Valuer to
value these adjacent site to Queens Quay C with a view to purchasing
additional land to deliver more affordable housing in the Queens Quay
regeneration site.  If this is achieved we would seek to develop a mixed tenure
approach to any expanded development site.
Clydebank Health Centre
The Council are continuously looking for opportunities to provide additional
new build council homes and this includes through the Scottish Government’s
trawl process which seeks to utilise public sector land sales for the delivery of
Page 99

Page 100

key national ambitions which includes the delivery of new homes. The former
Clydebank Health Centre in Kilbowie Road, Clydebank was identified through
this process and approval was granted to acquire the site from NHS Greater
Glasgow and Clyde at the November meeting of the Housing and
Communities Committee for £707,400.
However, NHS Greater Glasgow and Clyde have informed us that they no
longer wish for accountancy purposes for the transaction to complete in
financial year 2022/23, instead they will only conclude the sale of the land in
financial year 2023/24.  This is disappointing in terms of the Council’s planned
acquisition of the site in this financial year would have enabled an additional
£707,400 from the Scottish Government’s Affordable Housing Supply
Programme funding.  This money is in effect now lost to the wider West
Dunbartonshire economy and to the wider national Affordable Housing Supply
Programme.
As a result of the above, the Council and NHS Greater Glasgow and Clyde
have instructed the District Valuer to revalue the site to allow the acquisition to
conclude in the next financial year.  We will provide an update and seek
approval to acquire the land for development purposes at the next Housing
and Communities Committee.  We are not anticipating any significant
difference in the valuation, however for Scottish Government grant purposes a
valuation is only valid for a 6 month period (the site was previously valued in
December 2021.
Potential Additional Sites
The Council is internally assessing a potential development opportunity at an
area of land in its ownership at Queen Mary Avenue, Clydebank.  If it is
decided that this area should be transferred for a gross value of £140k to the
Housing Revenue Account for the purposes of developing social housing an
indicative massing exercise has established that a development of 16 new
homes could be delivered.
In addition, we are exploring an opportunity to develop a gap site in Council
ownership in Hardgate to provide 2 new homes.
Buyback Programme
The Council’s buyback programme which incorporates the Mortgage to Rent
Scheme has purchased 17* new homes to date in 2022/23.  It is the intention
to bring a full annual update report to the next meeting of the Housing and
Communities Committee in May 2023 in relation to the buyback scheme. 
4.5 The Housing Team are continuously looking for opportunities to provide
additional new build council homes and will bring any potential site to the
Housing and Communities Committee with as much information as possible
as part of the regular More Homes update paper.
5. People Implications
Page 100

Page 101

5.1 There are no people implications from this report.
6. Financial and Procurement Implications
Financial
6.1 In March 2022 Council approved the Housing Capital Programme 2022-2027
which saw significant resources committed to the delivery of new council
homes in West Dunbartonshire.  An expenditure budget of £83.393m for the
affordable housing supply programme is factored into the HRA Capital
Programme.  As it currently stands, it is anticipated that this programme will
complete on project life budget.
6.2 Influenced by Brexit, the current Covid-19 pandemic, Ukraine and other global
issues, the emergence of supply issues and subsequent cost increases has
begun to be felt across Scotland and the UK.  Whilst the impact of these is still
being examined, it is prudent to mention this as early as possible in order to
provide more detailed information at a future Committee when new tender
prices are known.
6.3 We are likely to see this impact on all our future development sites. Housing
Development Officers and Finance will continue to assess the impacts in the
context of affordability of developments.
Procurement
6.3 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted with 4.4 of this report will continue
to be prioritised.
6.4 Where the contract award is less than £50,000, authority is delegated to
the Chief Officer in consultation with the Procurement Manager to instruct the
award of contracts for the planned revenue and capital spend detailed in this
report to suppliers providing the most economically advantageous offer to the
Council.
7. Risk Analysis
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis.
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel.
Page 101

Page 102

8. Equalities Impact Assessment (EIA)
8.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
9. Consultation
9.1 As part of our previous rent consultation exercise, 92% of respondents
indicated their support for the Council’s ambitious plans to deliver the Housing
Revenue Account (HRA) new council house build programme. In addition,
there was positive support for the wider delivery of new build housing as part
of the recent Local Housing Strategy.  Regular updates on new build
development are provided to the West Dunbartonshire Tenants and Residents
Organisation at the bi-monthly liaison meetings.
10. Strategic Assessment
10.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire.
Having considered all the Council’s strategic priorities, this report and the
provision of new supply social housing for rent contributes greatly to all
strategic priorities. 
Peter Barry
Chief Officer, Housing and Employability
Date: 30 January 2023
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, telephone: 07793717981, email: john.kerr@west-
dunbarton.gov.uk
Appendices: None
Background Papers: West Dunbartonshire Council’s Local Housing Strategy
Local Housing Strategy, Health Inequalities Impact
Assessment
DVS Valuation Report Development Site: Clydebank
Health Centre
Wards Affected: All
Page 102

Page 103

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 22 February 2023
__________________________________________________________________
Subject: Willox Park Sheltered Housing Complex
1. Purpose
1.1 This purpose of this report is to provide the Housing and Communities
Committee an update on the action we are taking to understand the damp and
mould problems experienced by the tenants at Willox Park.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the content of the report and the progress made to date in carrying
out initial surveys and approve spend for future surveys and required
works at Willox Park sheltered housing complex.
(ii) Approve a temporary suspension of letting activity at the complex whilst
further surveys are completed.
(iii) Note the expected timescales for completion of surveys (Q1 2023) and
expected information and recommendations for the future of the homes
(Q2 2023, subject to findings of surveys); and
(iv) Note that a further update report will be provided to the next meeting of
the Housing and Communities Committee
3. Background
3.1 Willox Park comprises 36 terraced bungalows offering sheltered housing in
Dumbarton. It was built in the 1960s and is typical of the building and space
standards of that time.  Whilst the tenants like having their own front doors
and a little outside space the internal layout is not conducive to easy living for
those with limited mobility.
3.2 The existing homes have received replacement roof and external wall
insulation over the last twenty years alongside investment in kitchens,
bathrooms and windows.
3.3 However, tenants have complained of dampness and draughts.  Following
initial inspections, it was agreed that specialist advice was needed and we
instructed several in-depth specialist surveys at an empty property (no 3
ITEM 12
Page 103

Page 104

Willox Park) which meant we did not need to disrupt or decant any tenants to
carry out these intrusive and detailed surveys. 
4. Main Issues
Survey findings and next steps:
4.1 The survey of No 3 Willox Park found evidence of rising damp which, if
present in all of the properties, may have implications for the long-term
integrity of the buildings. The next steps are carrying out further damp surveys
at the complex. 
4.2 We are seeking a couple of tenants to volunteer their homes for an invasive
damp survey which will monitor moisture in the walls and floors over a number
of weeks.  One tenant has so far volunteered and we will be working closely
with this tenant and we are also liaising with the contractor to give the tenants
a briefing on the surveys they will be doing to keep everyone informed. 
4.3 In addition, we are working with another specialist contractor to organise non-
invasive damp surveys of every property at the complex.   These surveys will
take less than an hour and will provide a second professional opinion on the
extent and potential causes of the dampness across all the homes at Willox
Park. The outcome being all homes, where tenants are able to give us
access, will have received a damp survey and combined with the findings of
the more invasive surveys we will build up evidence of the cause, and extent,
of the dampness experienced by tenants.  This will provide us with important
information to plan for the long term future of these homes. 
4.4 Based on the survey of number 3 the consultants recommended a number of
fire safety improvements be made to the properties. These included ensuring
that the EICR certificates were up to date, correct fire alarms were installed in
the homes, additional plug sockets were provided (to discourage people
overloading sockets) and new fire doors.  The first three of these items have
been completed by the Council and new doors have been ordered and will be
installed shortly.
4.5 Following the initial survey the Council also completed a fire risk assessment
on the non-residential property within the complex, this identified some of the
same recommendations and additional ones we can take to enhance the fire
safety of these properties.  These have been flagged on the council H&S
reporting system and action has been taken for example we are exploring bin
storage solutions and carrying out PAT testing on the electrical appliances
used by the wardens. 
4.6 Both the survey and the FRA recommended that fire compartmentalisation
was enhanced in the loft and ceiling spaces and we are researching
appropriate solutions to boost the fire resistance between properties at loft
level.  We are working with a consultant to identify solutions and once agreed
the Council will prioritise any works identified. 
Page 104

Page 105

4.7 We are ensuring a people centred approach to fire safety at Willox Park and
all actions seek to enhance the fire safety measures already in place. 
4.8 The surveys highlighted outstanding repair and maintenance issues at
number 3 and many of these affected the rest of the complex such as blocked
gutters and broken window vents and as a result we have prioritised these
repairs to ensure that the homes continue to be well maintained. 
4.9 Whilst we carry out the surveys to ascertain the cause and extent of the
dampness we have placed a hold on replacement kitchens, bathrooms and
windows. However, all other repairs should be reported and will be completed
by the Council. As indicated above we intend to continue a more proactive
approach to identifying repairs within the complex. 
4.10 The redevelopment of the care home site continues and we are in the process
of procuring engineers and other consultants to enable the development to
progress to planning permission and correspondingly construction site start.  
Ultimately, we intend to develop 17 new amenity standard homes which will
be energy efficient, designed with dementia and wheelchairs/ mobility frames/
electric scooter usage in mind
4.11 In conclusion, over the next two months, we are aiming to build a
comprehensive picture of the condition of all of the homes so we can decide
on how best to proceed in terms of a wider housing masterplan for the area
which will look at investment in the current properties and the opportunities to
redevelop the site through demolition and new build. It would be the intention
to bring such a report following consultation with tenants to a future meeting of
the Housing and Communities Committee in Summer 2023. 
5. People Implications
5.1 There are no people implications from this report.
6. Financial and Procurement Implications
Financial
6.1 The surveys and additional consultancy advice required to build a detailed
picture of the homes have been budgeted for and likewise repairs and
maintenance works will come from the appropriate budgets. However, once
the survey findings and recommendations, including likely some indicative
costings, are received we will carry out an asset management options
analysis to ensure we are achieving value for money for these properties.
6.2 The suspension of lettings will result in lost rental income but should any
properties become vacant this will provide us with a number of benefits
namely it will allow us to carry out further surveys or decant existing tenants
into another property in the complex while work is completed to their home.
Procurement
Page 105

Page 106

6.3 We have procured our consultants to date through the appropriate competitive
bids process and will continue to do so to ensure that we get the correct
balance between quality and price to ensure value for money for WDC.
6.4 Where the contract award is less than £50,000, authority is delegated to
the Chief Officer in consultation with the Procurement Manager to instruct the
award of contracts for the planned revenue and capital spend detailed in this
report to suppliers providing the most economically advantageous offer to the
Council.
7. Risk Analysis
7.1 We maintain risk registers for each project which highlights the risk within and
out-with the project team’s control.  These are maintained and adjusted on an
on-going basis.
8. Equalities Impact Assessment (EIA)
8.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
9. Consultation
9.1 We have worked to keep tenants up-to-date with the survey findings and next
steps utilising newsletters, letters and the housing officer. The TRA at Willox
Park is actively involved in tracking the processes and have been heavily
involved in the consultation for the new build element of the complex.
10. Strategic Assessment
10.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire.
Having considered all the Council’s strategic priorities, this report and the
provision of new supply social housing for rent contributes greatly to all
strategic priorities. 
Peter Barry
Chief Officer, Housing and Employability
Date: 9 February 2023
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, telephone: 07793717981, email: john.kerr@west-
dunbarton.gov.uk
Page 106

Page 107

Appendices: None
Background Papers: None
Wards Affected: Ward 3
Page 107

Page 108

Page 108

Page 109

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources 
Housing and Communities Committee: 22 February 2023
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 31 December 2022 (Period 9)
1. Purpose
1.1 The purpose of the report is to provide members with an update on the
financial performance to 31 December 2022 (Period 9) of the HRA revenue
and capital budgets for 2022/23.
2. Recommendations
2.1 Members are asked to:
i) note the revenue analysis shows projected adverse variances of
£2.116m however this will be offset by reducing the contribution from
revenue to capital (CFCR) therefore netting to a revenue break even
position ; and
ii) note the net projected annual position in relation to the capital plan is
highlighting an in-year adverse variance of £27.772m (42.33%) which is
made up of re-profiling of £31.671m (48.27%) and overspend of
£3.899m (5.94%) as detailed in Appendix 4.
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23 and a total budget of £47.018m.
Capital
3.2 At the meeting of Council on 9 March 2022, Members also agreed the
updated Capital Plan for 2022/23 which has been augmented by re-profiling
and from 2021/22 and budget adjustment to produce a total planned spend for
2021/22 of £65.604m.
4. Main Issues
Revenue
4.1  The budgetary position for HRA Revenue is provided in Appendix 1 with
information on projected variances valued at more than £0.050m being
provided as Appendix 2.This shows a net break even position which is made
ITEM 13
Page 109

Page 110

up of projected adverse variances of £2.116m, offset by reducing the
contribution from revenue to capital (CFCR) by the same amount therefore
netting to a revenue break even position.
Due to the spend reprofiling shown below in Capital (4.3), the CFCR which is
budgeted in HRA revenue can be reduced without any concerns around the
ability to fund the Capital spend in 2022/23.
Capital 
4.2 The HRA capital summary position is shown in Appendix 3. Information on
projects that are highlighted as being within the Red category is provided in
Appendix 4 and Appendix 5 provides information on the projects at Green. A
summary of anticipated resources is shown in Appendix 6. The analysis
shows that there is currently a projected in-year adverse variance of
£27.772m. 
4.3 From the analysis within the appendices it can be seen that the projects with
forecast material slippage, are listed as follows:
Project Name Slippage (£m)
Doors/window component renewals 1.500
Roof Coverings 2.255
Affordable Housing Supply Programme 27.673
Reasons for slippage are explained in Appendix 4.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year.  This can
affect all service areas.
Page 110

Page 111

8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Housing management and Legal services have been
requested on this report and both have advised there are neither any issues
nor concerns with the proposal.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer – Resources
Date: 22 January 2023
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner (HEED),
16 Church Street, Dumbarton, G82 1QL,     
Telephone: 01389 737704, e-mail janice.rainey@west-
dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue) 
Appendix 3 - Budgetary Position (Capital)
Appendix 4 - Variance analysis Red Projects (Capital)
Appendix 5 - Variance analysis Green Projects (Capital)
Appendix 6 - Resources (Capital)
Appendix 7 - Analysis of Affordable Housing Supply 
Programme (Capital)
Background Papers: None
Wards Affected: All
Page 111

Page 112

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2022/23
PERIOD END DATE
Subjective Summary
Total Budget
2022/23 
£000
Spend to
Date
2022/23 
£000
Forecast
Spend
£000
Annual RAG
Status
Employee Costs 6,690 4,796 6,932 242 4% 
Property Costs 2,030 1,267 1,909 (121) -6% 
Transport Costs 112 85 139 27 0% 
Supplies, Services And Admin 395 173 330 (65) -16% 
Support Services 2,724 1,742 2,613 (111) -4% 
Other Expenditure 532 650 754 222 42% 
Repairs & Maintenance 12,942 9,763 13,783 841 6% 
Bad Debt Provision 1,060 731 975 (85) -8% 
Void Loss (Council Tax/Lost Rents) 857 1,644 2,150 1,293 151% 
Loan Charges 12,175 9,232 12,309 134 1% 
CFCR 7,501 4,039 5,385 (2,116) -28% 
Total Expenditure 47,018 34,122 47,279 261 1% 
House Rents 45,215 33,342 45,388 (173) 0% 
Lockup Rents 210 148 206 4 2% 
Factoring/Insurance Charges 1,316 977 1,302 14 1% 
Other rents 115 78 116 (1) -1% 
Interest on Revenue Balance 55 23 30 25 45% 
Transfer from Reserves 0 0 100 (100) 0% 
Miscellaneous income 107 45 137 (30) -28% 
Total Income 47,018 34,613 47,279 (261) -1% 
Net Expenditure 0 (492) 0 0 
Forecast Variance 2022/23
£000               %
31 December 2022
ITEM 13
Page 112

Page 113

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 December 2022
PERIOD 9
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
EMPLOYEE COSTS 6,690 6,932 242 4% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
PROPERTY COSTS 2,030 1,909 (121) -6% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPLIES, SERVICES AND ADMIN 395 330 (65) -16% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
This adverse variance is mainly due to the agreed pay award being higher than the 2%
budgeted . Also £60K of this adverse variance relates to the increased pay awarded to
caretakers  following  job evaluation panel on 7 April.  This £60K is offset by a transfer from
HRA service improvement reserve which is shown in the income section .
A year end overspend is anticipated
It is not possible to mitigate against an agreed pay award however managers will continue
to review any possible reductions in costs where possible to try and partially offset some of
this
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers electricity, gas, rates, rents, cleaning  and insurance costs.
Variance Narrative
A favourable variance is expected due to the revised probable calculations for utilities,
based on 21/22 actual outturn plus required inflation rates.
A year end underspend is anticipated
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers computer supplies & equipment, telephones, printing, postages and tenant participation costs.
Variance Narrative
A favourable variance is forecast due to the expectation that the ICT computer software
recharge for 22/23 will be similar to the 21/22 recharge, which was lower than 22/23 budget,
resulting in a projected favourable variance.  Tenant Participation costs are also expected
to be under budget based on the trend of the spend year to date.
A year end underspend is anticipated
ITEM 13
Page 113

Page 114

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 December 2022
PERIOD 9
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPORT SERVICES 2,724 2,613 (111) -4% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
REPAIRS & MAINTENANCE 12,942 13,783 841 6% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
BAD DEBT PROVISION 1,060 975 (85) -8% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Budget Details Variance Analysis
A favourable variance is expected with the assumption that the 2022/23 forecast outturn for
support services is expected  to be in line with the 2021/22 outturn adjusted for pay uplifts
etc. This charge is calculated each year end based on HRA's percentage usage of the total
cost of WDC support services. The 2022/23 HRA budget was set before this 2021/22
outturn was known so was based on 2020/21 charge which was higher.
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Budget Details Variance Analysis
Subjective Analysis forecast Variance
This budget covers central support recharges to the HRA
Subjective Analysis forecast Variance
The adverse  variance within Repairs & Maintenance is due to additional work being carried
out to catch up with both jobbing  repairs and void repairs. Additional capacity to do this has
been achieved through use of sub contractors as well as continuing with HMTA work so in
effect more than a typical year worth of work is expected to be completed in 2022/23,
therefore the cost will be higher than usual.
Variance Narrative
Variance Narrative
This budget covers all repair and maintenance expenditure to houses and lockups
Subjective Description
A year end underspend is anticipated
A year end overspend is anticipated
A year end underspend is anticipated
In order to get back  to pre - COVID levels of voids and repairs , it is considered necessary
to pursue this increased activity for 2022/23 albeit at a financial cost . It should be noted
that in previous years, costs were lower than budgeted due to lower activity in lockdown /
COVID restrictions .
Variance Narrative
The Bad Debt Provision expected to be required for 2022/23 is less than estimated at time
of budget setting, resulting in a favourable variance. This assumes that the provision
required in 2022/23  will be similar to the 2021/22 provision.
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Page 114

Page 115

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 December 2022
PERIOD 9
VOID LOSS 857 2,150 1,293 151% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
LOAN CHARGES 12,175 12,309 134 1% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
CFCR 7,501 5,385 (2,116) -28% 
Main Issues
Mitigating Action
Anticipated Outcome
Variance Narrative
The main reason for the projected adverse variance relates to the number of void properties
being higher than expected at time of budget setting. The budget was set on the
assumption that backlogs following COVID delays  in getting voids turned around would be
resolved early in year however the  numbers continue to be high .
A void working group has been reviewing the issues and have been implementing actions
and working with Housing Maintenance managers to improve the situation and it is
expected that the void figures will start to decrease significantly over the next few months.
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
A year end underspend is anticipated
Service Description
This budget covers the contribution from revenue to Capital
Variance Narrative
In order to offset the cost pressures on the revenue HRA in 2022/23 , it will be necessary to
reduce the contribution to Capital to allow the HRA account to break even. Due to a large
part of the planned Capital spend on new builds being reprofiled into 2023/24 this reduced
contribution will not create any issues for the remaining Capital programs being delivered in
2022/23.
None available
Budget Details Variance Analysis
A year end overspend is anticipated
Variance Narrative
The main reason for this varaince is the due to interest payments being higher than
anticipated at time of budget setting.
None available
A year end oversend is anticipated
Subjective Analysis forecast Variance
Service Description
Loan Charges is made up of repayments of principle sums, and the payments of interest and expenses
Page 115

Page 116

APPENDIX 3
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 9
Spend to
Date Spend to Date
£000 £000
Red
12 44.4% 12,763 63.5% 12 44.4% 12,763 63.5%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
15 55.6% 7,321 36.5% 15 55.6% 7,321 36.5%
27 100% 20,084 100% 27 100% 20,084 100%
Budget Spend to
Date
Forecast
Spend Forecast Variance Budget Spend to Date Forecast
Spend
Forecast
Variance Reprofiled Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
166,246 12,763 170,325 4,079 53,876 12,763 26,285 (27,592) (31,671) 4,079
0 0 0 0 0 0 0 0 0 0
49,874 7,321 49,694 (181) 11,727 7,321 11,547 (181) 0 (181)
216,120 20,084 220,019 3,899 65,604 20,084 37,831 (27,772) (31,671) 3,899
216,120 20,084 220,019 (3,899) 65,604 20,084 37,831 27,772
0 0 0 0 0 0 0 0
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 December 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at RAG
Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Project Status Analysis
Project Life Financials Current Year Financials
Red
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
ITEM 13
Page 116

Page 117

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,266 703 31% 2,635 369 16%
Current Year Financials 431 703 163% 800 369 86%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 271 5 2% 271 0 0%
Current Year Financials 185 5 3% 94 (91) -49%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials 192 0 0% 192 0 0%
Current Year Financials 192 0 0% 0 (192) -100%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-24
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
Main Issues / Reason for Variance
Budget overspend is anticipated due to costs and demand for budget being higher than anticipated at time of budget setting.
Mitigating Action
None available at this time.
Anticipated Outcome
Project to complete over budget.
Capitalised minor works
This is a budget to undertake specific minor ad hoc capital projects that arise on demand 
Planned End Date  Forecast End Date
QL Development
This budget relates to the costs associated with the development of the Integrated Housing
Management System
Anticipated Outcome
Element of budget required to be rephased to 23/24.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Development of QL system continues through 2022/23.  It was anticipated that two fixed term posts would be appointed to support
the ongoing development, however these posts have not yet been filled and this element of the budget will be required to be
reprofilled to 23/24.
Mitigating Action
None available at this time.
Main Issues / Reason for Variance
The GAA have still to publish their Noise Insulation Scheme which was scheduled for Autumn 2022, the scheme would detail
funding arrangements for those properties both commercial and residential that fall within the scope of the scheme.  The delay to
the publication has negated the opportunity to commence this project in 22/23.  Officers are pressing the GAA for an update in
terms of their timescales, however at this time it is anticipated that the project will be reprofilied to 23/24.
Mitigating Action
Officers liasing with GAA
Anticipated Outcome
Budget to be rephased to 23/24
Airport Noise
Noise Insulation Project 
Planned End Date  Forecast End Date
ITEM 13
Page 117

Page 118

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
4
Project Life Financials 17,607 1,636 9% 17,607 0 0%
Current Year Financials 4,955 1,636 33% 2,700 (2,255) -46%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
5
Project Life Financials 10,963 778 7% 10,963 0 0%
Current Year Financials 2,500 778 31% 1,000 (1,500) -60%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
6
Project Life Financials 566 141 25% 658 92 16%
Current Year Financials 108 141 131% 200 92 86%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Roof Coverings
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp
Anticipated Outcome
Full budget will not be spent and balance to carry into 23-24
Doors/window component renewals
Doors/Windows Component Renewals 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Currently behind monthly targets, unlikely to meet full spend and targets. Current tiled roof progress is behind cumulative monthly
targets but overall output is anticipated to increase with the new metal and flat roof framework contract coming on board
contributing to a wider range of roof types being completed.
Mitigating Action
Officer and contracts team working to maximise progress where possible to increase completions and spend.
Main Issues / Reason for Variance
Officers working to meet revised targets.  Additional external support has been programmed in from August onwards to assist with
window installs, feedback from officers have highlighted challenges with resource levels from back-up contractor.  This will be
monitored closely, however approximately £1.5m will need to reprofiled into 23/24.
Mitigating Action
Building Services actively redeploying internal resurces to assist with installs and working with external support to maximise
contribution.
Anticipated Outcome
Anticipated to meet reduced forecast spend
Main Issues / Reason for Variance
Projected to exceed budget, this is necessary work to meet demand and comply with legislation.
Mitigating Action
None available.
Anticipated Outcome
Budget to overspend.
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply with
the relevant standards / legislation / health and safety in relation to housing stock. 
Planned End Date  Forecast End Date
Page 118

Page 119

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
7
Project Life Financials 5,092 2,187 43% 6,723 1,631 32%
Current Year Financials 969 2,187 226% 2,600 1,631 168%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
8
Project Life Financials 5,293 1,216 23% 5,707 414 8%
Current Year Financials 1,036 1,216 117% 1,450 414 40%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
9
Project Life Financials 8,384 3,147 38% 9,884 1,500 18%
Current Year Financials 2,000 3,147 157% 3,500 1,500 75%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
10
Project Life Financials 3,637 423 12% 3,637 0 0%
Current Year Financials 887 423 48% 600 (287) -32%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
None available since essential spend.
Anticipated Outcome
Budget to overspend.
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition
survey and renewal of obsolete/damaged boilers. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
An overspend is anticipated on this budget, as experienced in recent years as demand has exceeded expectations. Current
progress continues this trend. Due to the nature of this project (ensuring heating and hot water availability) there is no option for a
conscious reduction of installs.
Modern facilities and services
New Kitchens, Bathrooms and Showers 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Budget overspend is anticipated due to costs and demand for budget being higher than anticipated at time of budget setting.
Mitigating Action
None available at this time.
Anticipated Outcome
Project to complete over budget.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Void works to continue into 22/23 to bring void properties up to a lettable standard.  The high number of voids has led to a higher
than expected demand for this budget, resulting in a projected overspend in 22/23. 
Mitigating Action
None available at this time
Void house strategy programme
Spend on Void Properties to bring them up to letting standard
Anticipated Outcome
Void properties to be brought up to lettable standard, budget to overspend.
Mitigating Action
Contracts team working to maximise progress and outturn where able to.
Anticipated Outcome
Full spend unlikely to met and balance to carry forward to 23-24
Defective structures/component renewals
Defective structures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Slightly behind schedule and anticipated to be under full spend target. Balance to be reprofiled to 23/24.
Page 119

Page 120

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
11
Project Life Financials 5,092 1,105 22% 5,491 399 8%
Current Year Financials 969 1,105 114% 1,368 399 41%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
12
Project Life Financials 106,883 1,422 1% 106,556 (326) 0%
Current Year Financials 39,645 1,422 4% 11,972 (27,673) -70%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Sites to be reprofiled £m
Aitkenbar Primary School (374)
Clydebank East (13,754)
Queens Quay Site B (629)
Queens Quay Site C (878)
Pappert (4,481)
Bank Street (575)
Willow Park Phase  1 (1,989)
Mount Pleasant (2,420)
Future New build sites (2,246)
TOTAL OF ALL PROJECTS (27,346)
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas
Anticipated Outcome
Full budget spend, with overspend anticipated.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
An overspend is anticipated in 22-23 due to level of demand and material costs being higher than expected at time of budget
setting.
Mitigating Action
None available at this time.
Main Issues / Reason for Variance
Progress will continue to be monitored as the year progresses.  The £27.673 variance is made up of £0.326m underspend and a
reprofiling of £27.346m into 2023/24 onwards . Summary of reprofiled sites together with site specific updates as follows:-
Clydebank East -Clydebank East - 88 units to be completed on the site. Project spend now requires to be reprofiled. Anticipated
site start of June 2022 has been delayed as a result of assessing remediation strategy options, while the exercise has proved to
be a lengthy process the options have identified an affordable method which is estimated to be around £9m less costly than the
original proposed method.  We are now in receipt of revised tender costs and a pre start meeting is scheduled for January prior to
works commencing later in January.  The remediation methods will take longer and will be the first phase of the development and
the construction of the new homes will likely commence in April 2023. £13.754m of the £18.754m current year budget will be
required to be reprofiled into 23/24.
Queens Quay Site B - 29 units now completed on the site. Project spend now requires to be reprofiled. Retention figure of
£0.629m budgeted to be paid out in 2022/23 will now be reprofiled to be paid in 2023/24 to allow time to finalise account.
Queens Quay Site C  – 20 units to be completed on site. Project spend now requires to be reprofiled. The budget provision is to
acquire additional land within Queens Quay to enhance the Site C proposals, the discussions with CRL/Rydens have been
protracted but we intend to make an offer shortly subject to the DV valuation being received. This will be reprofiled into 2022/23
(£1.878m).
Affordable Supply Programme
Affordable Housing Supply Programme 
Planned End Date  Forecast End Date
Aitkenbar - Fully complete. Project spend now requires to be reprofiled. Retention figure of £0.374m budgeted to be paid out in
2022/23 will now be reprofiled to be paid in 2023/24 to allow time to finalise account.
Page 120

Page 121

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
TOTAL OF ALL PROJECTS
Project Life Financials 166,246 12,763 8% 170,325 4,079 2%
Current Year Financials 53,876 12,763 24% 26,285 (27,592) -51%
Pappert - 27 units to be completed on site . Projects spend now requires to be reprofiled.  The anticipated site start of October
2022 will not be realised due to a number of factors that have caused the project to miss a number of milestones, notably a longer
than anticipated procurement process and the subsequent delay in developing a contract/tender preparation forced us to miss a
pricing window from the contractor, we anticipate a new cost price in November with a site start of March 23.  It is expected
£0.500m will be paid out in 2022/23 with the remaining £4.481m to be reprofiled into 2023/24
Future New Build gap sites  – Project spend now requires to be reprofiled. Ongoing work to acquire private and Council owned
sites to finalise wider strategy . Expected that there will be  spend of £0.500m this during 2022/23 so £2.246m will be reprofiled
into 2023/24.
Anticipated Outcome
Project will still complete and will meet revised spend profiles .
Bank Street - 20 units to be completed on the site. Project spend needs reprofiled due to wider strategic reasons and potential
reprovisioning of sheltered accommodation which will require consultative exercise . Revised estimated start date July 2023,
estimated completion January 2025.  Project is currently at feasibility stage.  Likely outturn for 22/23 for the Bank Street site is
expected to be circa. £0.420m with £0.575m therefore required to be reprofiled to 23/24.
Willox Park Phase1 - 17 units to be completed on site. Project spend now requires to be reprofiled  . Pre planning discussions
were more involved than anticipated and required some re designing which has resulted in delay to estimated start date from
January 2023 to June 2023 with estimated completion May 2024. Demolition complete, and site investigation under way.  Officers
ready to submit to for full planning.  Tender application expected to go out April 23.  At this stage spend in the current year is
expected to be £0.400m against budget of £2.390m resulting in reprofiling rquirement of £1.989m.
Mount Pleasant - 25 units to be completed on site. Project spend now requires to be reprofiled. Unanticipated longer time frame
for demolition (9 months) has delayed this project by 6 months, now estimating a March 2023 site start, although demolitions are
planned for next month. £0.100m expected costs in 22/23, resulting in reprofiling requirement of £2.420m to 23/24.
Bonhill Gap Site - 32 units to be completed on site.  Estimated start date July 2023 and estimated completion September 2024. 
The project is currently  at design stage with spend of £0.420m expected in 22/23.  No reprofilng required.
Mitigating Action
Staff will work closely with all stakeholders to try and ensure timely resolutions of issues as they arise.
Page 121

Page 122

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,487 396 16% 2,487 0 0%
Current Year Financials 474 396 84% 474 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 1,557 324 21% 1,557 0 0%
Current Year Financials 664 324 49% 664 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials 170 0 0% 170 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
4
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
Special needs adaptations
None available at this time
Anticipated Outcome
Full budget spend, possibility of overspend.
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Possibility of overspend due to price increases and demand levels rising.
Mitigating Action
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
A number of priority initiatives, supported by the Better Homes Project Board,  are being investigated and are envisaged to have a
positive impact on the current council housing stock and budget, with works expected to progress in 22/23.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Gypsy Travellers Site
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Community Safety Projects
Community Safety Projects 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
ITEM 13
Page 122

Page 123

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 36 0 0% 36 0 0%
Current Year Financials 36 0 0% 36 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
6
Project Life Financials 19,841 3,556 18% 19,841 0 0%
Current Year Financials 4,455 3,556 80% 4,455 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
7
Project Life Financials 257 32 13% 257 0 0%
Current Year Financials 75 32 43% 75 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Redployable CCTV Cameras
Purchase of 5 redeployable CCTV cameras for Housing use
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
5 redeployable cameras to be purchased as planned.  No issues anticipated.
Mitigating Action
None required
Targeted SHQS /EESSH compliance works
This budget is to focus on work required to maintain the SHQS compliance and energy
efficiency  with WDC housing stock. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Current progress is slightly behind cumulative monthly targets, work is
progressing and numbers improving.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Mitigating Action
None required
Anticipated Outcome
Full budget spend
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as
identified and recommended from the housing stock condition survey. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Page 123

Page 124

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
8
Project Life Financials 273 76 28% 273 0 0%
Current Year Financials 91 76 83% 91 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
9
Project Life Financials 280 0 0% 280 0 0%
Current Year Financials 54 0 0% 54 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
10
Project Life Financials 103 0 0% 103 0 0%
Current Year Financials 103 0 0% 103 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
11
Project Life Financials 581 0 0% 400 (181) -31%
Current Year Financials 181 0 0% 0 (181) -100%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and
recommended from the housing stock condition survey and appropriate council officer referrals.
Anticipated Outcome
Anticipated not to meet full spend despite best efforts.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
This programme always presents challenges with owner liaison and reaching agreements to install door entry where none exists,
this contributes directly to achieving SHQS compliance for this element and reducing abeyances. The budget reflects the demand
and number of installs required but it is acknowledged that full uptake is unlikely.
Mitigating Action
Officers continue to liaise with owners to encourage agreement for install.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught
exclusion)
Anticipated Outcome
Full budget spend
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Improvement works (Risk St)
Risk Street Over clad 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Contingencies
This is a contingent budget for unforeseen matters which may arise during the year. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, contingent budget for unplanned spend
Mitigating Action
none at this time
Anticipated Outcome
Spend as required
Page 124

Page 125

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
12
Project Life Financials 1,135 126 11% 1,135 0 0%
Current Year Financials 215 126 58% 215 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
13
Project Life Financials 2,378 0 0% 2,378 0 0%
Current Year Financials 800 0 0% 800 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
14
Project Life Financials 7,729 933 12% 7,729 0 0%
Current Year Financials 2,019 933 46% 2,019 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
15
Project Life Financials 13,031 1,878 14% 13,031 0 0%
Current Year Financials 2,504 1,878 75% 2,504 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Asbestos management works
This budget is to fund work associated with the management of current asbestos legislation and 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme
Multi Story Flats  ( including Fire Risk Assessment Works)
High Rise Fire Safety Measures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet spend and revised targets.
Anticipated Outcome
Budget spend anticipated, should criteria be met.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme, back
into council use.  These properties must assist the council with reducing housing need on the waiting list and where appropriate
assist with external capital works.  For these reasons, any purchase is subject to stringent criteria to ensure accountability and
value for money for existing tenants.  Spend in 22/23 will therefore be dependent on these factors.  So far this year, 15 homes
have been purchased, with the target to deliver an additional 20 homes each year through the buyback scheme.
Mitigating Action
None required.
Main Issues / Reason for Variance
No Issues, budget for salaries and support
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Salaries/central support/offices
Allocation of costs from other WDC services who support the HRA capital programme 
Planned End Date  Forecast End Date
Page 125

Page 126

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
TOTAL OF ALL PROJECTS
Project Life Financials 49,874 7,321 15% 49,694 (181) 0%
Current Year Financials 11,727 7,321 62% 11,547 (181) -2%
Page 126

Page 127

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (48,826) (4) 0% (48,826) 0 0%
Current Year Financials (30,006) 0 0% (10,480) 19,526 -65%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials (42,531) 0 0% (38,702) 3,829 -9%
Current Year Financials (9,215) 0 0% (5,386) 3,829 -42%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials (124,667) (19,723) 16% (124,667) 0 0%
Current Year Financials (26,286) (19,723) 75% (21,548) 4,738 -18%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Due to spend being later than anticiapted , receipt of grant will also be later than budgeted.
Mitigating Action
Income budget wil be reprofiled to match reprofiled spend
Anticipated Outcome
Income will be received in 2023/24
Main Issues / Reason for Variance
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
New Build Grant 
Grant to facilitate new build housing 
Planned End Date  Forecast End Date
CFCR
This is capital spend which is funded by revenue budgets
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Income from Revenue reduced to offset adverse varainces in HRA revenue
Mitigating Action
None required
Anticipated Outcome
Reduced CFCR
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved
for the purposes of funding capital expenditure
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery therefore due to reprofiling, the requirement in 2022/23 will be less.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch
up over the programme life.
ITEM 13
Page 127

Page 128

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 9
Budget Forecast Spend
£000 £000 % £000 £000 %
31 December 2022
Budget Details Project Life Financials
Spend to Date Variance
New Build Grant
4
Project Life Financials (96) (357) 372% (513) (417) 434%
Current Year Financials (96) (357) 372% (417) (321) 334%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL RESOURCES
Project Life Financials (216,120) (20,084) 9% (212,708) 3,412 -2%
Current Year Financials (65,604) (20,080) 31% (37,831) 27,772 -42%
Other Capital Income
Other Income to capital
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
£0.096m estimated income from Glasgow Airport Authority is now not expected to be received in 22/23 as works have not
progressed.  Works and therefore income now expected 23/24.  £0.416m Scottish Governmant Grant income estimated in
relation to buy backs.
Mitigating Action
None available
Anticipated Outcome
Income will be received when due
Page 128

Page 129

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
HRA CAPITAL PROGRAMME
ANALYSIS OF AFFORDABLE HOUSING SUPPLY PROGRAMME
MONTH END DATE
PERIOD 9
Budget Spend to Date Forecast Spend
£000 £000 £000 £000 %
RAG
Status
St Andrews School 636 129 290 346-   -54% 
Haldane Primary School 148 149 167 20 13% 
Aitkenbar Primary School 652 278 652 - 0% 
Clydebank East 26,474 58 26,474 - 0% 
Creveul Court 58 59 58 - 0% 
Queens Quay Site B 1,259 404 1,259 - 0% 
Queens Quay Site C 6,198 1 6,198 - 0% 
Pappert 7,332 3 7,332 - 0% 
Lilac Avenue 2,676 - 2,676 - 0% 
Bank Street 4,674 - 4,674 - 0% 
Clydebank Health Centre 6,930 6 6,930 - 0% 
Willox Park Phase1 3,817 59 3,817 - 0% 
Willox Park Phase2 6,300 - 6,300 - 0% 
Mount Pleasant 4,200 74 4,200 - 0% 
Silverton 2,100 - 2,100 - 0% 
Fees, Staffing Costs, contingency 4,005 28 4,005 - 0% 
Gap sites
Bonhill Gap Site 420 174 420 - 0% 
Future New build sites 16,824 - 16,824 - 0% 
Total Expenditure 94,703 1,422 94,376 (326) 
31 December 2022
Site
Project Life Financials
Variance
ITEM 13
Page 129

Page 130

Page 130

Page 131

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources
Housing and Communities Committee: 22 February 2023
___________________________________________________________________
Subject:  Financial Report 2022/23 as at Period 9 (31 December 2022)
1. Purpose
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 31 December 2022 (Period 9) of those services
under the auspices of the Housing and Communities Committee.
2. Recommendations
2.1 Members are asked to:
i) note the contents of this report which shows the revenue budget forecast
to overspend against budget by £0.079m (1.71%) at the year-end.
ii) note the net projected annual position in relation to relevant capital
projects which is showing no projected variance; and
iii) note the progress on efficiencies incorporated into budgets for 2022/23.
3. Background
3.1      Revenue Budget
At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23.
A total net budget of £3.691m was approved for services under the remit for
Housing and Communities services at that time. Adjustments have been
made since that date and the revised budget now under the remit of Housing
and Communities is £4.612m as per below.
Description £m
Starting Position 3.691
Cost of Living budget allocation 0.302
Homeless Prevention 0.082
Pay Award 0.679
Vacancy freeze -0.105
National Insurance reduction -0.024
Recurring Variance reduction -0.013
Revised budget 4.612
ITEM 14
Page 131

Page 132

Capital
3.2 At the meeting of Council on 9 March 2022, Members also agreed the
updated 10 year General Services Capital Plan for 2022/2023 to 2031/32. 
The next three years from 2022/23 to 2024/25 have been approved in detail
with the remaining 7 years being indicative at this stage. The total project life
budget approved for projects that have either commenced or are due to
commence in that period total for Housing and Communities services was
£1.212m.
4. Main Issues
Revenue Budget
4.2 Appendix 1 shows the probable outturn for the services at £4.691m. As the
revised annual budget is £4.612m there is a projected adverse variance
currently projected of £0.079m. A more detailed analysis by service is given in
Appendix 2. Comments are shown in Appendix 3 when there are projected net
annual variances greater than £0.050m and also where the net variance is
below £0.050m but there are offsetting variances of over £0.050m within the
service. Appendix 4 shows progress on the achievement of saving options
adopted as part of the 2022/23 budget.
Capital Budget
4.3 The overall programme summary report is shown in Appendix 5. The analysis
shows that for the in-year planned spend there is currently no projected
variance.
5. People Implications
5.1 There are no people implications.
6. Financial Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report.
6.2  Agreed management adjustments for 2022/23 are monitored with
current indications being that the saving of £0.021m will be achieved (see
Appendix 4).
7. Risk Analysis
7.1 The present variances should be viewed in the knowledge that there are a
number of variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets – particularly in light of COVID-19.
Page 132

Page 133

7.2 Assumptions around service demand and timing of nationally agreed changes
through the phasing out of lockdown change regularly and therefore there is a
significant risk that the projected year end budgetary position will change from
that reported.  
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Finance and Legal services have been requested on this
report and both have advised there are neither any issues nor concerns with
the proposal. As the report is for noting no further consultation is envisaged.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer, Resources
Date: 27 January 2023
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner, 16
Church Street, Dumbarton, G82 1QL, telephone: 01389
737707, e-mail janice.rainey@west-dunbarton.gov.uk
Appendices: Appendix 1 - Summary Budgetary Position (Revenue)
Appendix 2 - Detailed Budgetary Position (Revenue)
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Efficiencies/Savings Options
(Revenue)
Appendix 5 - Budgetary Position (Capital)
Appendix 6 - Variance Analysis Green (Capital)
Background Papers: None
Wards Affected: All
Page 133

Page 134

WEST DUNBARTONSHIRE COUNCIL Appendix 1
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 31 December 2022
Actual
Outturn
2021/22
Total Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
Annual
RAG
Status
Net Variance
Attributable to
Covid
Underlying
Variance
Excluding
Covid
£000 £000 £000 £000 £000 % £000 £000
2,721 3,432 2,635 3,323 (109) -3%  0 (109)
876 1,011 747 1,010 (1) 0%  0 (1)
500 473 820 694 221 47%  89 131
41 32 0 36 4 13%  0 4
65 Private Sector Housing Grant 79 (105) 81 2 3%  0 2
434 472 315 415 (57) -12%  0 (56)
0 Housing Asset and Investment 46 24 35 (11) -24%  0 (11)
(567) (933) (919) (903) 30 3%  0 30
4,071 4,612 3,517 4,691 79 1.71%  89 (10)
Service / Subjective Summary Annual Variance 2022/23
Communities
Homeless Persons
Private Sector Housing
Anti Social Behaviour
Housing Maintenance Trading A/c
Total Net Expenditure
Working 4 U
ITEM 14
Page 134

Page 135

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 December 2022
PERIOD 9
Actual Outturn
2021/22 Service Summary
Total
Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
RAG Status
Net Variance
Attributable to
Covid
£000 £000 £000 £000 £000 % £000
17,621 Employee 20,371 14,994 20,839 470 2%  0
2,984 Property 2,071 1,582 2,274 202 10%  0
1,324 Transport and Plant 1,188 896 1,196 8 1%  0
11,049 Supplies, Services and Admin 4,458 4,929 6,629 2,171 49%  0
3,796 Payments to Other Bodies 5,316 3,019 5,414 98 2%  89
(3) Other 250 0 250 0 0%  0
36,772 Gross Expenditure 33,655 25,419 36,602 2,949 9%  89
(32,701) Income (29,041) (21,902) (31,912) (2,870) -10%  0
4,071 Net Expenditure 4,612 3,517 4,691 79 2%  89
£000 £000  £000  £000  £000 % £000
2,496 Employee 3,393 2,260 3,264 (129) -4%  0
0 Property 2 0 0 (2) -100%  0
4 Transport and Plant 19 10 12 (7) -37%  0
102 Supplies, Services and Admin 222 143 236 14 6%  0
1,494 Payments to Other Bodies 2,817 1,212 2,805 (11) 0%  0
0 Other 250 0 250 0 0%  0
4,096 Gross Expenditure 6,702         3,626         6,567 (135) -2%  0
(1,375) Income (3,270) (991) (3,244) 26 1%  0
2,721 Net Expenditure 3,432         2,635         3,323 (110) -3%  0
£000 £000  £000  £000  £000 % £000
618 Employee 938 687 936 (2) 0%  0
282 Property 80 50 80 0 0%  0
4 Transport and Plant 4 4 6 2 45%  0
7 Supplies, Services and Admin 3 20 22 19 603%  0
173 Payments to Other Bodies 146 74 145 (1) -1%  0
0 Other 0 0 0 0 0%  0
1,084 Gross Expenditure 1,172         835 1,189 17 1%  0
(208) Income (160) (88) (179) (19) -12%  0
876 Net Expenditure 1,011         747 1,010 (1) 0%  0
£000 £000 £000 £000 £000 % £000
2,121 Employee 2,623 1,974 2,708 86 3%  0
2,397 Property 1,667 1,451 1,871 204 12%  0
24 Transport and Plant 31 27 36 5 16%  0
236 Supplies, Services and Admin 103 85 116 13 13%  0
789 Payments to Other Bodies 950 744 1,044 93 10%  89
0 Other 0 0 0 0 0%  0
5,567 Gross Expenditure 5,375 4,282 5,776 401 7%  89
(5,067) Income (4,901) (3,462) (5,082) (181) -4%  0
500 Net Expenditure 473 820 694 220 47%  89
£000 £000 £000 £000 £000 % £000
0 Employee 0 0 0 0 0%  0
0 Property 0 0 0 0 0%  0
0 Transport and Plant 0 0 0 0 0%  0
0 Supplies, Services and Admin 0 0 0 0 0%  0
41 Payments to Other Bodies 32 0 36 4 12%  0
0 Other 0 0 0 0 0%  0
41 Gross Expenditure 32 0 36 4 12%  0
0 Income 0 0 0 0 0% 
41 Net Expenditure 32 0 36 4 12%  0
Private Sector Housing
Annual Variance
2022/23
All Services
Working 4 U
Communities
Homeless Persons
ITEM 14
Page 135

Page 136

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 December 2022
PERIOD 9
Actual Outturn
2021/22 Service Summary
Total
Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
RAG Status
Net Variance
Attributable to
Covid
Annual Variance
2022/23
£000 £000 £000 £000 £000 % £000
39 Employee 40 31 42 2 5%  0
223 Property 241 19 241 0 0%  0
0 Transport and Plant 0 0 0 0 0%  0
0 Supplies, Services and Admin 0 (1) 0 0 0%  0
249 Payments to Other Bodies 245 181 245 0 0%  0
0 Other 0 0 0 0 0%  0
511 Gross Expenditure 525 230 527 2 0%  0
(446) Income (446) (335) (446) 0 0%  0
65 Net Expenditure 79 (105) 81 2 2%  0
£000 £000 £000 £000 £000 % £000
280 Employee 359 244 355 (4) -1%  0
0 Property 0 0 0 0 0%  0
2 Transport and Plant 1 6 9 9 1197%  0
4 Supplies, Services and Admin 5 2 5 0 0%  0
149 Payments to Other Bodies 162 64 148 (14) -9%  0
0 Other 0 0 0 0 0%  0
434 Gross Expenditure 527 316 517 (10) -2%  0
0 Income (55) (1) (103) (47) -86% 
434 Net Expenditure 472 315 415 (57) -12%  0
………………………………………………………………………………………………………………………………………………………………………………………….
£000 £000 £000 £000 £000 % £000
336 Employee 453 280 381 (72) -16%  0
0 Property 0 0 0 0 0%  0
3 Transport and Plant 5 3 4 (1) -20%  0
1 Supplies, Services and Admin 0 0 1 1 0%  0
0 Payments to Other Bodies 0 0 0 0 0%  0
0 Other 0 0 0 0 0%  0
340 Gross Expenditure 458 283 386 (72) -16%  0
(340) Income (412) (259) (351) 61 15%  0
- Net Expenditure 46 24 35 (11) -24%  0
£000 £000 £000 £000 £000 % £000
11,732 Employee 12,564 9,517 13,153 589 5%  0
82 Property 82 63 82 0 0%  0
1,287 Transport and Plant 1,128 846 1,128 0 0%  0
10,699 Supplies, Services and Admin 4,125 4,679 6,249 2,124 51%  0
901 Payments to Other Bodies 964 743 991 27 3%  0
(3) Other 0 0 0 0 0%  0
24,698 Gross Expenditure 18,863 15,848 21,603 2,740 15%  0
(25,265) Income (19,796) (16,767) (22,506) (2,710) -14%  0
(567) Net Expenditure (933) (919) (903) 30 -3%  0
Housing Maintenance Trading A/c
Private Sector Housing Grant
Anti Social Behaviour
Housing  Asset and Investment
Page 136

Page 137

WEST DUNBARTONSHIRE COUNCIL Appendix 3
REVENUE BUDGETARY CONTROL 2022/2023
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Working 4 U 3,432 3,323 (109) -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Homeless Persons 473 694 221 47% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Anti Social Behaviour 472 415 (57) -12% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome A year end underspend in Anti-Social Behaviour Service
This is the provision of the anti social behaviour service within the Council area
A favourable variance is anticipated due to the increased recharge of ASB posts to HRA
following workload analysis.
None required
Budget Details
Variance Analysis
Variance
This variance is due to employee costs being lower due to additional external funding being
used to fund some existing posts .
This service seeks to prevent homelessness occurring across the authority and improves
access to support services
Several issue are causing this overspend , the main issues are as follows :- Employee costs is
expected to overspend as a result of an employee not being included in budget, and also
overtime and agency costs incurred. The property costs overspend of £204K is mainly due to
higher than budgeted increase in gas and electricity cost ; similarly price of furniture and white
goods have significantly increased causing an adverse variance  and also increased rental
costs of having additional homeless accommodation to meet expected needs. There has also
been difficulties in having homeless units turned around and ready when required which has
resulted in a forecasted £88K spend on bed and breakfast.  £181K of the overspend is offset
by anticipated additional income based on current occupancy levels.
Most of this variance is due to inflationary pressures which are not possible to mitigate for
since the relevant budget lines are demand led. The rent charged to DWP for homeless
should reflect the cost of providing the service so it would be expected that these increases
would result in a review of rent to increase in line with cost pressures.  However due to the
Scottish Government rent freeze announced in 2022  this was not possible . The rent freeze
on Social Housing will be removed at end of March 2023 and therefore for 2023/24  a review
of rental rates to be met by DWP will be able to reviewed.
A year end overspend in anticipated
This is the provision of Working 4u service
None Required
A year end underspend is anticipated
31 December 2022
ITEM 14
Page 137

Page 138

Housing Asset and Investment 46 35 (11) -24% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Maintenance Trading A/c (933) (903) 30 -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service delivers maintenance and investment services to the council's housing stock.
Small under-recovery against surplus target
None available
Payroll costs forecast to exceed budget primarily due to higher overtime costs as resource is
committed to addressing the exceptionally high number of void properties needing repaired
and to addressing the COVID related repairs backlog. Supplies and service costs are forecast
to exceed budget due to higher subcontracting costs. The subcontracting resource is needed
to maintain service levels during this period of very high demand across responsive repair and
void repairs. The additional employee and contracting costs are offset by increased recharges
to the HRA revenue and capital budgets.
The adverse variance of £54K on the account primarily relates to the unfunded element of the
22/23 pay award.
This service manages capital investment across council and private sector housing stock.
Employee costs are showing a favourable variance due to vacant posts within the service. 
Employee cost underspend is offset by a reduction in the level of income being recharged to
the Housing Revenue Account.
None Required
Slight underspend at year end
Page 138

Page 139

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2022/23 Appendix 4
Efficiency
reference
Efficiency Detail Budgeted
Amount £
Projection of
Total Saved £
Projection of
Total Not Saved
£
Comment
MA2 Move CCTV monitoring in-
house
Housing &
Employability
20,000 20,000
- 20,000 20,000
ITEM 14
Page 139

Page 140

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD
Spend to
Date
Spend to
Date
£000 £000
Red
0 0% 0 0% 0 0% 0 0%
Amber
0 0% 0 0% 0 0% 0 0%
Green
3 100% 859 100% 3 100% 39 100%
3 100% 859 100% 3 100% 39 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Forecast
Variance Slippage Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
PL CY
0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
1,212 859 1,212 0 147 39 147 0 0 0 0% 0%
1,212 859 1,212 0 147 39 147 0 0 0
31 December 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
TOTAL EXPENDITURE
9
Projects are forecast to be overspent and/or significant delay to completion
Amber
Red
Projects are forecast to be overspent and/or experience material delay to completion
Amber
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
ITEM 14
Page 140

Page 141

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 9
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 912 832 91% 912 0 0%
Current Year Financials 80 35 44% 80 0 0%
Project Description
Project Manager Elaine Troup
Chief Officer Peter Barry
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 100 26 26% 100 (0) 0%
Current Year Financials 17 4 21% 17 0 0%
Project Description
Project Manager Graham Watters
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
3
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager John Kerr
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
31 December 2022
Budget Details
Project Life Financials
Spend to Date Variance
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Development of system progressing, with full budget spend anticipated to be incurred in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Full spend is anticipated on this year's budget.
Integrated Housing Management System
Development of IHMS system.
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated
service delivery in response to community need. This is complimented by community capacity building,
empowering WD citizens to do more for their own communities (leading to less reliance on council).  Also
included is the implementation of participatory budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application process is planned for later in this financial year.
Main Issues / Reason for Variance
The Council is currently trying to secure new funding to provide new accommodation within the Dennystoun Forge site. This may require some
redesign of the existing site and has resulted in proposed works to provide additional play and security measures being held until future design
proposals are confirmed.
Mitigating Action
Officers carried out some proactive consultative work to establish the tenant priorities this will allow the work programme to be developed
timeously.
Anticipated Outcome
It is expected the works programme  will be completed during 2022/2023.
Anticipated Outcome
Development of IHMS system.
Dennystoun Forge Site Improvements
Dennystoun Forge Site Improvements
Planned End Date Forecast End Date
ITEM 14
Page 141