2022-23
DELIVERY PLAN 
Housing and Employability

Page 2

Contents
1. INTRODUCTION .............................................................................................................................................................................................................................. 2
2. PERFORMANCE REVIEW ................................................................................................................................................................................................................. 2
3. STRATEGIC ASSESSMENT ................................................................................................................................................................................................................ 5
4. RESOURCES ................................................................................................................................................................................................................................... 15
5. APPENDIX 1: ACTION PLAN ........................................................................................................................................................................................................... 17

Page 3

1.  Introduction 
Housing & Employability comprises a wide range of services covering Communities, Housing Development and Homelessness,
Housing Operations and Working 4U. The gross general fund for Housing and Employability budget is £11.994m with a net
budget of £4.931m. The Housing Revenue Account has an expenditure and income revenue budget of £47.018m together with a
Capital budget of £47.233m. It is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan. Key actions to
help achieve that are set out in this Delivery Plan, together with actions to address any performance issues and service priorities
identified in the planning process. 
The progress of this Plan will be monitored and managed by the management team and reported to Housing & Communities
Committee twice yearly, at mid-year and year-end. 
2. Performance Review 
The management team completed a detailed review of 2021/22 performance, focusing on the following: 
• 2021/22 Delivery Plan year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• Scottish Housing Regulator
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints;
• Continuous Improvement (Fit for Future reviews)
• Other benchmarking/feedback/ etc.

Page 4

This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are
summarised below. 
Key Achievements 2021/22 
• Establishment of Community Empowerment Project Board and Project Teams to ensure delivery against approved
Strategy. 
• CCTV- completed TUPE transfer of CCTV monitoring staff and brought full service in house for improved service delivery
through newly established CCTV Team. 
• Delivery of Community Transport, Community Budgeting and Participatory Budgeting mainstreaming pilot projects.
• We delivered 306 new council homes over 21/22, and established the Council as the largest social housing developer in
West Dunbartonshire meeting a wider range of needs, including the first dementia designed development in Scotland at
Creveul Court, Alexandria 
• We developed and delivered a new Local Housing Strategy which will set out the housing vision for West Dunbartonshire
in the next 5 year period
• New Key Housing Policies were developed and implemented including a new Tenant Participation Strategy, Domestic
Abuse policy and Homeless Prevention Fund as part of commitment towards rapid rehousing and homelessness.
• We scaled up our Housing First initiative to 48 tenancies and maintained exceptionally high levels of tenancy sustainment
• Our homelessness prevention service successfully ensured that 29 households were prevented from an episode of
homelessness. 
• We ensured, in the most challenging of circumstances, that there were no breaches of the Unsuitable Accommodation
Order (UAO) and have eradicated street homelessness within West Dunbartonshire through our 24/7 homelessness
service.
• Implemented digital improvements in Housing Operations for communicating with customers including use of text
messaging, online surveys and improvement in online forms for new applicants and medical assessments.
• Carried out a comprehensive review of the housing waiting list, undertook a Fit for Future process focusing on Voids and
Allocations, established a Void Working Group and established an Estate Caretaking Working Group
• Allocated over 900 houses this year despite pandemic restrictions 
• Neighbourhood team and caretaking service continued to operate during the pandemic and we relaunched ASB service
now providing 7 days a week service, working until 2am
• Restarted our joint community and service Estate Walkabout’s within our communities

Page 5

• Pilot introduced to provide duty phone number for Housing Operations enquiries within Dumbarton/Alexandria and
Clydebank
• Developed and implemented the CLD plan 2021-24 
• Developed employability partnership and lead agency approach for No one left behind
• Created statement of provision for period products
• Recognition for W4U services including the attainment of quality standard  accreditation for the delivery of information and
advice services in addition the CLD team received an award in partnership with West College Scotland
• Apprenticeship investment fund 2018-21 delivered successfully.  West Dunbartonshire Council Apprenticeship Investment
Fund of £1million secured for a further four years 
• Established process for managing the spend of Community Renewal Fund
• Delivered on the Connecting Scotland Programme; distributing 1578 digital devices (Chromebook and IPad) and provided
1392 households with Wi-Fi 
Challenges 
• Ensuring buy-in across all service areas for Participatory Budgeting mainstreaming which is essential to meet Scottish
Government targets.
• A key challenge remains in building community resilience and advancing on the community empowerment work during the
ongoing pandemic. 
• A key ambition remain for the team to advance the wider employee volunteering project bring benefits to the community
and personal development for the volunteers.
• Raising awareness and delivering training to the workforce to support the community empowerment agenda.
• Transitioning away from reliance on Council budgets to support community groups and projects. 
• The pandemic has continued to impact on the most vulnerable and over the last 2 years we have witnessed an
unprecedented rise in homeless presentations, we will continue to review and implement policies and practices to address
this.  
• Increase of Domestic Abuse cases resulting in homelessness presentations
• The wider impacts of the cost of living crisis in West Dunbartonshire including housing stability.
• The introduction of the Homelessness Prevention Duty across all public bodies
• The drive to decarbonisation and ensuring our housing stock is fit for the future 
• Increase in anti-social behaviour and the underpinning challenge to reduce tolerance of ASB within communities and

Page 6

influence improvements in behaviours within communities
• Increased pressure on temporary accommodation, due to the backlog of voids, staffing shortages and material challenges
due to impact of Covid 
• Volatility in the construction industry has continued to be challenging for the delivery of new build houses within budget and
on time
• Communication with Tenants in relation to phone enquiries provided a huge challenge across Housing Operations during
the pandemic. To address this, a duty line was implemented in Dumbarton and Alexandria and Clydebank area and
discussions underway to enhance further by introduction of queue/options phone provision
• Impact of Scottish Government Covid restrictions in relation to the delivery model for Housing Operations and remote
working challenges
• Developing W4U as a lead agency for Employability Partnership 
• Transition to a future prosperity fund, Community Renewal Fund, keeping staff beyond Dec 2022
• Apprenticeship Investment Fund beyond April 2022. 
3. Strategic Assessment 
The Housing & Employability team completed a strategic assessment and performance review to determine the major influences
on service delivery and strategic priorities going forward into 2022/23. As a result of this assessment the following factors were
recognized as having a significant influence on the work of service in 2022/23: 
Financial Challenges
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative
funding gap in 2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID will continue in 2022/23,
and whilst there is still some carried forward COVID funding from the Scottish Government available for use in 2022/23, it is
difficult to assess whether it will continue to be sufficient due to the ongoing unpredictability of the impact of the pandemic on
people’s lives and local businesses.  We will continue to monitor the overall financial position of the Council and updates on
estimated future budget gaps will be reported to Elected Members throughout 2022/23.

Page 7

These challenges mean further action is required to balance our budget and protect services for residents. This will mean that,
within Housing & Employability, available funding will be reduced and we will need to reconfigure how we work and what we do
to deliver further efficiencies.   
UK Shared Future Prosperity Fund (replacement to European Funding) 
Britain’s exit from the European Union created considerable uncertainty on the availability of this funding. Discussions are
underway at a national level for a replacement programme: ‘UK Shared Future Prosperity Fund’. Details of the scale and
priorities for these replacement funds have been provided and we have submitted an Investment Plan as part of a Glasgow City
Region approach. The Investment Plan is being assessed by the UK Government and we expect to hear further information in
October/November 2022. 
While it is remains unclear what funding will be available beyond December 2022 to replace European Structural Funds we will
mitigate associated risks to employability services by utilising alternative sources of funding such as ‘No One Left Behind’: and
‘Parental Employability Support Funds’ and the ‘Young Persons Guarantee’. Planning for the development and delivery of these
funds is underway to ensure that the benefits from them are maximised. 
Supporting Vulnerable People
People are vulnerable if they are unable to live at the standard that most others would expect. For instance households may
have housing and food, but remain poor if they can’t afford to put the heating on at home, families and children may have mobile
phones, mobile devices and computers, but remain poor if there isn’t sufficient connectivity to use the equipment for everyday
activity that others take for granted.
Understanding life transitions is important in this regard. These are typically the most significant milestones in people’s lives that
often become our greatest undertakings/challenges and will have a direct impact on the quality of our lives, these can include,
losing a job, having your tenancy ended unexpectedly or imprisonment or release. Our ability to cope with the impact of these
transitions can be significant and will have a bearing on our well-being and prosperity. 
Each of these transitions has an associated cost that, in combination with other factors such as life circumstances, can
exacerbate difficulties, particularly among families with limited resources such as those in our priority groups. It is not sufficient to
focus on particular groups without understanding circumstances, transitions and barriers that affect families and individuals on a
daily basis. Housing and Employability’s approach to addressing vulnerability, disadvantage and poverty in West Dunbartonshire

Page 8

is based on delivering services and support that can mitigate the negative impact of transitions; address the barriers households
and communities face and address, where possible, the structural drivers of poverty. 
Local Employability Developments / Fair work 
The Scottish Government and COSLA have signed the ‘No One Left behind’ partnership agreement with an associated Delivery
Plan that will create an opportunity for transformational change in employability services. This will promote a partnership
approach where West Dunbartonshire Council will act as lead partners with private and third sector service providers to identify
local needs and make informed decisions about how best to support employability. 
This process will see the transfer of six funding programmes, currently delivered by a range of organisations, into a single, all
age support service. This process will bring about a range of opportunities, but will require considerable planning to ensure the
smooth transition to the new operating environment.   
To date we have established a local employability partnership to ensure that we co-ordinate employability service provision in an
effective way. In addition to No One Left Behind, Parental Employability Support and Modern Apprenticeship programme (and
funds) funds additional funds have been made available as a direct result of COVID-19. This includes the ‘Young Persons
Guarantee’. We will integrate strategic management of the funds into the local employability partnership approach in order to
maximize the benefits for young people in West Dunbartonshire. We are currently developing a three year plan for delivery of
employability services. 
Employment: Green jobs 
Working 4U will continue to monitor labour market policy and direction to capitalise on emerging opportunities in zero
carbon/green energy sectors. This will be carried out in conjunction with Skills Development Scotland and West College
Scotland.  The aim will be to identify any emerging opportunities for zero carbon employment development, including for example
Retro fit housing including internal wall insulation; solar panels; and air source heat pumps. 
Legislative and Policy Drivers 
Child Poverty (Scotland) Act 2017

Page 9

The intention of the Child Poverty Bill is to ‘set targets relating to the eradication of child poverty’ as well as making provision for
plans and reporting relating to achievement of these targets. It requires the Scottish Government to meet four income based
child poverty targets by 2030 as well as set out and report on the actions they will take to meet those targets. In addition the Act
places a duty on local authorities and health boards to report annually on what they are doing to contribute to reducing child
poverty. 
The local child poverty action report must set out a range of commitments to address the key drivers of poverty: 
• Increasing income through employment; 
• Maximise income from the social security system; and
• Reducing household costs. 
Community Empowerment (Scotland) Act 2015
The Act sets out clear requirements for public bodies in promoting a greater level of local decision making and empowerment of
citizens. This includes, for example, Asset Transfers, Participation Requests and Community Planning. All services across WDC
must be engaged in the process of empowering communities and work is underway to ensure awareness of the empowerment
agenda is raised. During 2022/23 we will continue the programme of work set out within the WDC Community Empowerment
strategy. 
Community Learning and Development 
The Community Learning and Development (Scotland) Regulations 2013 place a statutory requirement on local authorities to
publish a plan every three years. The plan should outline how the local authority will co-ordinate and secure ‘adequate and
efficient’ Community Learning and Development (CLD) provision with other sector partners. 
The CLD plan 2021-24 specifies: 
• How the provision of community learning and development will be coordinated with other organisations and agencies that
provide community learning and development within West Dunbartonshire; 
• What action will be taken to deliver the community learning and development plan between September 2021 and September
2024; 
• What action other organisations and agencies intend to take to provide community learning and development in West
Dunbartonshire between September 2021 and August 2024; and 
• Any needs for community learning and development that will not be met within the period of the plan.

Page 10

This Plan (2021 -2024) despite the challenges associated with COVID-19 sets our sights on recovery and consolidating the
range of available CLD services. We aim to match or exceed the level of support provided over the previous three years. That is:
engage and support on average years, between 1,250 and 1,400 learners and assist 700 people to secure a qualification. 
Homelessness Prevention Duty 
Many of the proposals within the recent Homelessness prevention consultation would introduce important and positive changes
for people at risk of homelessness and we had outlined our broad views in our consultation response. Key issues for West
Dunbartonshire will be a need to have sufficient and adequate resources to fund the crucial services to address homelessness,
as well as local flexibility in line with local circumstances. In addition, local democratic oversight and accountability over services
involved. 
Presently, local authority homeless and housing services are stretched and financially challenged across Scotland. The current
situation is also becoming increasingly more challenging in a context of constrained resources, changes to the Unsuitable
Accommodation Order, the humanitarian efforts to accommodate refugees and deliver the more recent Ukrainian schemes, as
well as the risks surrounding the potential increase in homelessness presentations when the schemes come to an end. 
A further concern is the recent Court of Session decision in Glasgow on the local authority providing appropriate accommodation,
which could result in an increase in Judicial Reviews across the country with a further impact on resources. Consideration also
needs to be given to the timing of the implementation of changes to local connection which could potentially exacerbate current
pressures. As well as expected cost of living increases in the months ahead. 
Domestic Abuse drives a significant proportion of homelessness presentations from women. As women mainly lead an
overwhelming proportion of single parent families in Scotland this has an impact on children’s wellbeing and development. 
Improving housing options for young people are also vital, along with a need for an improvement in the availability and
effectiveness of support services for those likely to struggle to manage a tenancy. As well as for those individuals at risk of
homelessness when leaving custody. 
Local Housing Strategy & Housing to 2040
The Local Housing Strategy (LHS) sets out how West Dunbartonshire Council and its partners plan to address the housing and
housing related opportunities and challenges over the next five year period 2022/2023 – 2026/2027.

Page 11

We will implement the new strategy in 2022/23 and this new plan aims to build on the significant progress made on the issues
identified in the previous LHS 2017-2022 and to address newly arising housing matters particularly in response to the COVID-19
crisis. 
The Housing (Scotland) Act 2001 (‘the 2001 Act’) places a statutory requirement on local authorities to produce a LHS that sets
out its strategy, priorities and plans for the delivery of housing and related services. It should demonstrate the local authority’s
strategic approach to dealing with key housing related issues such as:- 
• Delivering high quality housing and housing related services across all tenures
• Setting out its contribution to the effective integration of health and social care
• Demonstrating how the LHS is supporting the Scottish Government National Outcomes and Targets, whilst reflecting the
needs and priorities of the local authority area. 
The development of the LHS is at an opportune moment with the publication of the Scottish Government Housing to 2040 Vision
and Principles Route Map publication in March.  At the time of writing we await the publishing of the full vision, however the draft
vision established a number of key principles including: 
• A well-functioning housing system: people can find, and afford, the right home for their needs. This will involve making the
best out of the housing stock we have, providing people with good investment options and ultimately ensuring the housing
system is fair;
• High-quality sustainable homes: all homes, regardless of the tenure or age of the home, should be well designed and high
quality.  They should be easily maintained, have clear running costs and be low-carbon.  Further, all homes should be
occupied;
• Sustainable Communities: Places should be vibrant, well connected and well designed. They should include a variety of
houses to enable people to move as their needs change and be designed to promote health and well-being including
quality green space; and
• Homes that meet people's needs: homes should support well-being and areas should offer a diverse range of homes to
allow people to move.  People should be able to easily access information about their housing rights alongside services to
support their independence.

Page 12

We will respond fully to Housing to 2040 within the wider development of the Local Housing Strategy, including the introduction
of a wider national rented home strategy. 
Rapid Rehousing/Housing First
Rapid Rehousing is about taking a housing led approach for people that have experienced homelessness, making sure they
reach a settled housing option as quickly as possible rather than staying in temporary accommodation for too long. 
Where homelessness cannot be prevented, Rapid Rehousing means: 
• A settled, mainstream housing outcome as quickly as possible; 
• Time spent in any form of temporary accommodation reduced to a minimum, with the fewer transitions the better; and
• When temporary accommodation is needed, the optimum type is mainstream, furnished and within a community. 
And for people with multiple needs beyond housing: 
• Housing First is the first response for people with complex needs and facing multiple disadvantages; and
• Highly specialist provision within small, shared, supported and trauma informed environments if mainstream housing,
including Housing First, is not possible or preferable. 
The need to continually improve the approach to homeless people with the most complex needs is recognised and Housing First
initiatives form part of the wider approach to tackling homelessness and repeat homelessness in Scotland.
Housing First West Dunbartonshire launched in April 2019 and the service is targeted at those with a history of issues such as
repeat homelessness, multiple and complex support needs and previous engagements with support services which have not led
to successful and / or sustainable outcomes. 
Statement of provision for period products 
The Period Products (Free Provision) (Scotland) Act 2021 received Royal Assent on 12th January 2021. The Act requires local
authorities to ensure period products (like pads and tampons) can easily be picked up free of charge for anyone who needs to
use them. Each responsible body must, as soon as reasonably practicable, prepare a written statement describing the plans for
provision. The statement must be prepared in consultation with relevant individuals, groups and organisations. 
During 2022/23 Working 4U will take the lead in developing the community-based provision and will promote the service through
the range of Community Planning Partnership and associated networks.

Page 13

New Housing Supply
West Dunbartonshire Council through the Strategic Housing Investment Plan delivered 1000 new homes for the West
Dunbartonshire Communities.  These properties all meet the recently introduced affordable housing design standard which
provides exemplar energy efficiency and space standards.  We will continue to push the boundaries in terms of our housing
building programme putting quality first and driving forward plans to tackle the current climate emergency. 
Better Homes/Sustainability 
Scotland has set a legally binding target of net-zero greenhouse gas emissions by 2045. Around 14% of emissions in Scotland
come from homes. Around 22% of homes in Scotland are social housing so as a strategic landlord we have a significant part to
play. All future council homes will be built to a net zero carbon standard. 
The Climate Change (Scotland) Act 2009 places duties on all public bodies to contribute to emission reduction targets
(Mitigation), deliver programmes to increase resilience against Climate Change (Adaptation), and to act in a ‘Sustainable’ way. 
Housing and Communities: In response we intend to further develop our housing asset management strategic approach and
commit to environmental sustainability which will allow us to build new homes and manage existing stock and assets in a way
that will make them fit for generations to come. Key to this will be developing a new Housing Capital Investment Programme that
combines our approach to decarbonisation and positively impacting on fuel poverty. 
In addition to the above through our Better Homes approach we are seeking to develop a new strategic vision for the future of
our high rise accommodation to enhance tenants’ living experiences and we intend to improve connectivity across our housing
stock, again to improve the lives of our tenants 
Community Choices 1% Framework agreement / Local Democracy
This joint agreement between COSLA and Scottish Government sets out a framework for at least 1% of local government
budgets to be decided by local residents through a participatory budgeting (PB) approach.   The framework has recently been
refreshed in light of COVID-19 and now includes the need for greater deliberative and participatory processes that contribute to
ensuring equality, inclusion and social renewal.

Page 14

Actively involving local people can make them less passive consumers of public services and more supportive of new models of
delivery. It promotes active participation and increased levels of local decision making. 
The key mechanism for meeting this target is the mainstreaming of Participatory Budgeting. This requires service areas across
the Council to consider and agree how a percentage of their annual budgets can be decided / directed by local people. A PB
Mainstreaming Steering Group has been established to monitor performance, promote a corporate PB approach and ensure
accurate reporting to the Scottish Government on an annual basis. 
Community Empowerment Strategy 
The West Dunbartonshire Community Empowerment Strategy and Action Plan is far reaching and sets out what is required to
promote empowered communities. The Strategy was developed by a partnership strategic group and with the Scottish
Community Development Centre (SCDC) leading on the consultation with local residents. 
A Project Board and Project Team have been established to monitor delivery against the actions set out in the Strategy.
Successful delivery will depend on a collaborative approach across the organisation, partnership and wider community to build
more resilient and empowered communities across West Dunbartonshire. This is a long term agenda that requires a real change
to service delivery to ensure it is responsive to local need, particularly as part of the COVID-19 recovery.   
Progress will be driven and monitored by a Project Board that will report to CPWD via the Empowered DIG. 
Housing: Improving the customer journey and support 
During 2021/22, initially as a response to the pandemic, we reviewed and adapted how we communicate with our customers.
This included improved alternative methods to access to housing operations and functions within it. During 2022/23 we will
further improve the customer journey to ensure the service is able to adapt to change and is reflective of new ways of
engagement and working.   
To address performance across a number of areas, the Housing operations team underwent a Fit for future review in 2021/22.
The areas that were mainly focused up on were void and allocations. During 2022/23 we will implement action arising from this
review to ensure we deliver the best service to our customers and improvement performance and efficiency. The establishment
of a void working group will be a key focus to drive these improvements forward.

Page 15

During this period we moved to a temporary model of specialist working for our Housing Officers across the service, in order to
focus and respond to the impact of Covid on our service.  We are now in the process of working towards return to generic ward
based community services and expect this updated model to be in place beginning October 2022. 
Locality Planning
The Community Empowerment (Scotland) Act 2015 requires local authorities to develop at least one Locality Plan to support
communities to identify their unique ambitions. Work is on-going to support a range of communities to develop their own
neighbourhood plans that will combine with Locality Plans to form Local Place Plans.  This work needs to be led by local
communities and supported by the Communities Team to ensure people are engaged and supportive of the outcomes. 
Continuous Improvement
In 2020, to support continuous improvement, the Council embarked on a programme of Fit for Future service reviews. Using a
range of tools that encapsulates service design, maturity assessments and employee engagement, information is gathered and
reviewed to identify improvements and to ensure our services are efficient and that we make best use of our resources. During
2022/23 we will continually assess the performance of the services within Housing and Employability, with a view to determining
if any services would benefit from a Fit for Future service review. 
Budget Sensitivity Analysis 
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher
risk/ higher value budgets which may have a significant impact on budgetary control and future budget projections. The analysis
has considered sensitivity around demand, costs and charges, and income levels. 
Within this service, one budget which has been identified as being more susceptible to fluctuations is: 
•    Homeless DWP income   - 2022/23 budget  £3.593m 
This income is dependent on occupancy levels in homeless units and assumptions around homeless tenants’ eligibility for
Housing Benefit / Universal credit. If the occupancy levels were to change by 5%, the income could range between £3.413m and
£3.772m. 
Action Plan & Risks
The challenges identified at section 2 and the key factors identified in Section 3 have informed Housing & Employability priorities
for 2022/23. Appendix 1 sets out the action plan to address them, including the relevant risks and the performance indicators and

Page 16

targets that will enable progress to be monitored and reported to stakeholders. It also incorporates the Strategic workforce
actions as well as the performance indicators that we use to measure and monitor the Housing & Employability Quality
Standards that help to define what users of our services can expect to receive, and remind both the organisation and our
employees of the challenges and obligations they face in delivering best value services. 
The Council has identified risks at both a strategic and service level. Strategic risks represent the potential for the Council to take
advantage of opportunities or fail to meet stated strategic objectives and those that require strategic leadership. Service risks
relate to service delivery and represent the potential for impact on individual services, or the experience of those who work within
the services, i.e. employees, partners, contractors and volunteers or service users and clients in receipt of the services provided. 
In planning for 2022/23, the Housing and Employability team considered the Council’s strategic risks and identified risks specific
to the service including risks relating to the pandemic. These are set out in the action plan at Appendix 1 alongside actions to
mitigate these, with the aim of improving or maintaining the current position (i.e. the current risk score). 
4. Resources 
Finance 
Housing & Employability has a net General Services revenue budget of £4.931m and a capital budget of £0.125m in 2022/23. A
breakdown by service area is set out below. We will make the best use of the resources available to deliver on key priority areas
and secure external/match funding where this is possible. 
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£m)
Private Sector Housing   0.032 0 0.032 0.035

Page 17

Homeless 4.969 4.615 0.354 
Communities 1.176 0.125 1.051 0.090
W4U 5.347 2.322 3.025 0
Anti-Social Behaviour 0.470 0.001 0.469 0
Total 11.994 7.063 4.931 0.125 
Housing and Employability also have responsibility for a considerable HRA, both revenue and capital. 
Gross Expenditure (Revenue) £m Capital  £m                                  
HRA budget 2022/23 47.018 47.233 
Employees 
Employee Numbers 
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows: 
Absence in 2021/22 
Service Area Headcount FTE
Communities Team  23 21.66
Housing Development & Homelessness 87 84.27
Housing Operations 119 116.42
Working 4U 114 97.54
TOTAL 343 319.88

Page 18

The quarterly absence statistics for Housing & Employability are shown below together with the Council average for the same
periods for comparison. The figures for Housing & Employability have been lower that the Council average throughout 2021/22: 
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Housing &
Employability 
2.57 3.14 3.80 3.66 12.39
COUNCIL WIDE TOTAL 3.27 3.58 4.50 5.03 14.55 
5. Appendix 1: Action Plan 
1. Our communities   
Our neighbourhoods are safe, resilient and inclusive
Performance Indicator Managed By
% of anti-social behaviour cases resolved Scott McLelland
% of Neighbourhood and Locality Plans supported by the Communities Team Clare English; Elaine
Troup
Number of incidents directed to Police by Public Space CCTV team Clare English
% of Public Space CCTV cameras operational  Clare English
Average number of days taken to provide Public Space CCTV evidence packages for law enforcement  Clare English
Action Due Date Managed By

Page 19

Build community resilience and advance community empowerment including the development of a training
programme to support the Community empowerment agenda
31-Mar-
2023 Clare English
Continue to improve and develop the Councils CCTV processes and infrastructure 31-Mar-
2023 Clare English
Identify and implement improvements in partnership working between the CCTV team and key partners to promote
feelings of safety in the area
31-Mar-
2023 Clare English
Explore alternative forms of funding to encourage less reliance on mainstream council funding 31-Mar-
2023 Clare English
Deliver the objectives set out in the Community Empowerment Strategy and Action Plan through identified priority
projects
31-Mar-
2023 Clare English
Lead on the Council’s approach to Participatory Budgeting Mainstreaming across the organisation 31-Mar-
2023 Clare English
Develop an Employee Volunteering Policy to support the ambitions of the Community Empowerment (Scotland) Act
2015
31-Mar-
2023 Clare English
Development and implementation of revised Anti-Social Behaviour strategy 31-Mar-
2023
Nicola
Pettigrew 
Strategic Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Engaging positively
with Residents,
Communities &
Partnerships
The risk that the Council fails to adequately
engage, establish and maintain positive
relationships with local residents and
communities in addition to partnership bodies.    
27-Apr-2022 Elaine Troup

Page 20

Service Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Failure to deliver
sufficient community
capacity building /
community
development support
to groups impacted by
COVID-19.
COVID-19 has had a huge impact on
communities across the authority. A focused
approach is needed to understand the impact on
community groups and to support them to re-
start and re-build. Failure to do this would
impact on the individual and community
resilience of citizens. 
04-Oct-2022 Elaine Troup
Failure to deliver on
the capacity building
of the Community
Empowerment
(Scotland) Act
As communities continue to recover from the
impact of Covid-19 there is an ever greater need
to support and develop communities.
Community capacity building and community
development work continues within existing
resources. 
04-Oct-2022 Elaine Troup
Failure to secure
community and
partner buy-in for the
approved Community
Empowerment
Strategy and Action
Plan.  
The risk level remains the same as work
continues on the Delivery Plan. The
establishment of a Project Board in 2021/22 has
reduced this risk level in relation to service area
buy-in.   
04-Oct-2022 Elaine Troup 
Our residents are supported to increase life and learning skills
Action Due Date Managed By

Page 21

Digital inclusion – progress the opportunities for provision of wi-fi infrastructure into new build properties and
priority areas of deprivation
31-Mar-
2023 John Kerr 
2. Our Environment 
Our neighbourhoods are sustainable and attractive
Performance Indicator Managed By
Number of new supply social housing for rent John Kerr
Tenancy Sustainment Levels within Housing First John Kerr
% satisfaction with quality of new build council housing John Kerr
% of all homeless cases re-assessed within 12 months (repeat homelessness) John Kerr
The number of incidences of youth homelessness in West Dunbartonshire is reduced John Kerr
Action Due Date Managed By
Develop and implement Housing regeneration approaches to improve our communities 31-Mar-
2023 John Kerr
Develop our Housing Asset Management to ensure sustainability and deliver new Housing Capital Investment
Programme
31-Mar-
2023 John Kerr
Implement  new Local Housing Strategy & council wide response to 2040 31-Mar-
2023 John Kerr
Implement year 4 of rapid rehousing plan (Home at the Heart) 31-Mar-
2023 John Kerr
Deliver New build Housing programme 31-Mar-
2023 John Kerr

Page 22

Deliver high rise accommodation strategy 31-Mar-
2023 John Kerr 
Service Risk Description Current
Assessment Target Assessment Date
Reviewed Owner
Failure to secure
funding to invest in
WDC’s CCTV
infrastructure.
The public space CCTV infrastructure covers
the three main townships of Alexandria,
Dumbarton and Clydebank with a mix of fixed
space and redeployable cameras. Until
resources can be secured and improvements
made the Council does remain at risk from
reputational damage, should the system fail. 
04-Oct-
2022 Elaine Troup
Failure to achieve the
outcomes of the
Scottish Social
Housing Charter
The Scottish Social Housing Charter sets out
the standards and outcomes that tenants and
customers should expect from social landlords,
in terms of the quality and value for money of
the services they receive. Failure to continue to
meet these could place the Council at risk of the
intervention powers of the Scottish Housing
Regulator    
07-Oct-
2021 John Kerr 
3. Our Economy 
Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Action Due Date Managed By

Page 23

Develop investment plan for shared prosperity fund 31-Mar-
2023 Stephen Brooks 
We will support our residents to access employment and training opportunities
Performance Indicator Managed By
Value (£) of debt managed Stephen Brooks
Number of local people entering employment through Working 4U Stephen Brooks
Number of local people entering education or training Stephen Brooks
Number of local people gaining a full qualification Stephen Brooks
% Unemployed People Assisted into work from Council operated / funded Employability Programmes Stephen Brooks
Action Due Date Managed By
Ensure no one left behind by supporting skills and learning for work, life and learning 31-Mar-
2023 Stephen Brooks
Promote inclusive growth through access to training and apprenticeship opportunities 31-Mar-
2023 Stephen Brooks 
Service Risk Description Current
Assessment Target Assessment Date
Reviewed Owner
Failure to prepare for
changes associated
with No One Left
Behind
No One Left Behind represents a
transformational change in employability service
provision, failing to prepare and reaching a state
of readiness will lead to lost opportunities for
investment in employability services.  
13-Apr-
2022 Stephen Brooks

Page 24

We will work with partners to support economic development to deliver increased prosperity for our area
Performance Indicator Managed By
Total Value (£) of Income Generated Stephen Brooks
Number of local people receiving support through Working 4U Stephen Brooks
Percentage of local people with increased or sustained income through reduced debt liability/debt management Stephen Brooks
Action Due Date Managed By
Support and implement CLD, Employability and Welfare benefit three year plans to promote  quality frameworks
and partnership working to enhance work, learn, money service provision
31-Mar-
2023 Stephen Brooks
Maximise income from employment 13-Mar-
2023 Stephen Brooks
Maximise income from benefits 13-Mar-
2023 Stephen Brooks
Ensure no one left behind by addressing life challenges and reducing costs 13-Mar-
2023 Stephen Brooks 
Service Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Failure to respond to
child poverty
legislation 
Failure to respond to child poverty legislation will
have a significant impact on the Council’s
reputation, more importantly an opportunity to  
13-Apr-2022 Stephen Brooks

Page 25

Service Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
raise issues and respond more effectively to
child poverty issues will be lost
Universal Credit Full
Service changes
breadth and depth of
demand for services
Migration of all claims to Universal Credit may
lead to increased service demand from people
who would not have used Working 4U service
otherwise. Including those requiring assistance
to meet the digital by default requirement; those
seeking to maintain their claim through
increased employability service requirement;
and the need to improve IT skills. 
The process has been intensified as a direct
result of covid-19 and the associated relaxation
of the rules has reduced the risk of increased
demand from this source.    
03-Feb-2022 Stephen Brooks
Failure to secure
alternative funds to
replace European
funding
Failure to identify alternative funds to replace
European Structural funds will increase
uncertainty and loss of staff to other services    
13-Apr-2022 Stephen Brooks
The cost of living
crisis will lead to a
substantial demand
for access to
welfare/debt support
services.
We will monitor the changing levels of demand
and target our resources to individuals and
areas that are most in need. We will seek to
work with partners to ensure we receive
appropriate referrals who can benefit from our
support.    
19-Sep-2022 Stephen Brooks

Page 26

4. Our Council 
Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Managed By
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce.
31-Mar-
2023 Peter Barry
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain the
workforce.
31-Mar-
2023 Peter Barry
Implement service review process including role design, use of new technology and new ways of working to add
resilience, address gaps, and establish opportunities for efficiencies
31-Mar-
2023 Peter Barry
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce.
31-Mar-
2023 Peter Barry 
Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Managed By
% of tenants satisfied with the overall service provided by their landlord John Kerr
Average length of time to re-let properties Suzanne Marshall
% of council rent that was lost due to houses remaining empty Suzanne Marshall
Action Due Date Managed By
Carry out review of housing policies and processes across housing management areas including void
management and re-let standards
31-Mar-
2023 Nicola Pettigrew 
Our residents are engaged and empowered

Page 27

Appendix 1 
Action Due Date Managed By
Explore digital opportunities such as Near me technology to develop housing management customer service and
experience
31-Mar-
2023 Nicola Pettigrew