WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 24 August 2022
___________________________________________________________________
Subject:     “Home at the Heart 2019-24” West Dunbartonshire’s Rapid Re-
housing Transition Plan update and new approaches to
homelessness progress report
1. Purpose
1.1 The purpose of this report is to provide members with an update on “Home at the
Heart” our Rapid Re-housing Transition Plan (RRTP) for the period 2019-24 and
new approaches to homelessness.
2. Recommendations
2.1  It is recommended that the Housing and Communities Committee:
(i) Note the progress made in the first three years of “Home at the Heart”,
which has informed an update report submitted to the Scottish
Government at the end of June 2022 and note the main objectives for
Year 4 attached as Appendix 1;
(ii) Approve that our Year 3 underspend outlined at 4.11 is used to meet the
objectives of the West Dunbartonshire Rapid Rehousing Transition Plan,
together with the Year 4 funding allocated by the Scottish Government;
(iii) Approve our spend and activity template of our Rapid Rehousing
Transition Plan attached as Appendix 2 to this report;
(iv) Note the uncertainty around future funding and specifically the risk to our
Housing First approach;
(v) Note that an annual update and progress report will be provided to the
Housing and Communities Committee in May 2023.
3. Background
3.1 Our current approach to tackling homelessness is outlined in our RRTP “Home
at the Heart”. This approach builds on the good progress made within West
Dunbartonshire by previous strategies, most recently our “More than a Roof”
approach which covered the period 2017/2020.  It reinforces the challenges set
by the renewed commitment to tackle homelessness to end rough sleeping and
to transform temporary accommodation.
3.2 “Home at the Heart” was developed in response to a key recommendation
from the Homelessness and Rough Sleeping Action Group (HARSAG) that
was adopted by the Scottish Government, for Local Authorities to develop and
submit a RRTP for the period 2019-24.
ITEM 10

Page 2

3.3 It was developed in partnership with key stakeholders, including the West
Dunbartonshire Health and Social Care Partnership and the West
Dunbartonshire Housing Solutions Partnership, which includes local
Registered Social Landlords and was submitted to the Scottish Government on
31 December 2018 and approved by the Housing and Communities
Committee on 6 February 2019.
3.4 Regular reports have been provided to the Housing and Communities
Committee, initially detailing and seeking approval for our RRTP and
subsequently providing updates in terms of progress being made and
approving the use of Scottish Government funding in order to deliver our key
objectives.
4. Main Issues
4.1 The aims of “Home at the Heart” in terms of tackling homelessness are
influenced by the Scottish Social Housing Charter and consistent with the
Scottish Government’s “Ending Homelessness Together” approach and are
structured around the following 4 strategic objectives:
• Deliver a whole systems approach to the prevention of homelessness;
• Enable service users with low or no support needs to access settled
housing quickly;
• Develop interim housing options which enable independent living and
tenancy sustainment; and
• Implement a Housing First model which enables the most excluded service
users to achieve housing sustainment.
4.2 The feedback received from the Scottish Government in relation to our RRTP
has been positive and highlighted a number of areas of good practice
including:
• The comprehensive temporary accommodation modelling undertaken as
part of our wider “More than a Roof” approach;
• The strategic approach to tackling homelessness;
• The introduction of the supported tenancy model;
• Prioritising and scaling up of Housing First;
• Our award winning Leaving Care Housing Protocol; and
• The fact that we have never breached the unsuitable accommodation order.

Page 3

“Home at the Heart” Year 3 progress
4.3 Objective 1: Deliver a whole systems approach to the prevention of
homelessness:
• FTE staff member to provide an enhanced proactive homeless prevention
role now permanent part of the service;
• Pilot Prevention Fund received over a 100 referrals in 2021/22 with 22
receiving payments from the fund which has helped households at risk of
homelessness remain in their social or private tenancies;
• Tenant Hardship Fund was fully utilised;
➢ 239 grant awards have been made totalling £263,000;
➢ 133 awards were made to RSL tenants totalling £123,718, an
average of £930 per case;
➢ 102 awards were made to WDC tenants totalling £131,003, an
average of £1284 per case;
➢ 4 awards were made to tenants in private lets totalling £8760,
• Our prevention initiatives have led to a 68% increase in approaches being
dealt with by our Housing Options Service during 2021/22, with over half of
these resulting in homelessness being prevented;
• Review of our Housing Allocation policy, it was agreed to create an
additional reasonable preference group for young people at risk of
homelessness and that a certain proportion of available properties should
be allocated to this group.
4.4 Objective 2: Enable service users with low or no support needs to access
settled housing quickly:
• Reviewed and updated the lettings targets for homeless households with
all social landlords across West Dunbartonshire, however letting activity
remained lower than expected;
Calculation of homeless lets required and % of expected
letting activity required to meet need - split by LA & RSL 
Year 3
target  Year 3 actual
Lets required to meet demand 867 733
Split LA 567 515
Split RSL 300 218
% Allocation of lets required
LA 56% 57%
RSL 55% 46%
We continued to deliver a quick and efficient assessment process to help
meet our targets;

Page 4

• Despite the impacts of Covid-19 and subsequent lockdowns and
restrictions, 592 homeless households with no/low support needs were
rehoused and were supported to move into settled accommodation;
• The average length of time these households spent in temporary
accommodation was 17 weeks.
4.5 Objective 3: Develop interim housing options which enable independent living
and tenancy sustainment:
• Continue to monitor the following protocols; Prison Discharge, Leaving
Care, and Hospital Discharge
• Reviewed our “No Home for Domestic Abuse” approach, to ensure that
victims are supported to pursue their most appropriate housing option;
• Continue to offer a Conversion Programme to provide settled
accommodation for more homeless households, 45 in Year 3 which was 15
above our indicative target;
• Supported Accommodation Initial Review completed with a committee
agreeing to FTE to take forward the recommendations to provide the new
required provision.
4.6 Objective 4: Implement a Housing First model which enables the most
excluded service users to achieve housing sustainment:
• We have recruited and trained a dedicated Housing First Support Team,
ended Year 3 with 8 Housing First support workers;
• Fully assessed 51 Housing First referrals jointly with clients, with 23 being
suitable and agreeing to participating in the Housing First approach;
• Created 28 new Housing First tenancies, in addition to the 20 created in
Year 1 and 2;
• Our Housing First approach has a tenancy sustainment rate of 94%, with
the only tenancies ending sadly being due to the deaths of the tenants.
• We have also had 3 tenancies “stepped down” term used by the Scottish
Government to describe with all parties agree the housing first client no
longer requires support due to positive progress made.
4.7 With the protections that the Scottish Government had created for most
renters during lockdown to help prevent evictions from taking place ending in
September 2021.  The number of section 11 notices have started to see a
significant increase particularly since the start of 2022 and will continue to
rise. 
4.8 The impact of the pandemic continued to have an impact on letting activity
across West Dunbartonshire in Year 3 (see table in 4.4).  Within West
Dunbartonshire Council we are still seeing lower than normal voids being
returned ready for let.

Page 5

4.9 A key consequence is an increase in the overall number of homeless
households in temporary accommodation and an overall increase in the
average time spent in temporary accommodation.    
4.10 At the time of writing in early July 2022, we had 72 households who had spent
over a year in temporary accommodation an increase from 53 in August 2021.
Most of these have complex need and we are actively working with these
households providing high levels of support and are focused on securing long
term housing solutions so that every household has safe and secure
accommodation.
4.11 These have then contributed to a Year 3 underspend in our RRTP less an
over spend of conversions as outlined in the table below, however as
highlighted later in this report the underspend for Year 3 will be utilised to
deliver Year 4 RRTP ambitions:
RRTP Year 3 spend Year 3 plan Year 3 spend Year 3
underspend
Housing First West Dunbartonshire £480,657 £417,000 £63,657
Interim Supported Tenancies £31,200 £31,200 £0
Additional Resettlement Support Service £38,500 £38,500 £0
Enhanced Prevention Service £38,500 £38,500 £0
Pilot Prevention Fund £16,633 £8,350 £8,283
Shared Living Initiative £28,810 £28,810 £0
Review of Residential Supported
Accommodation
£18,000 £16,048 £1,952
Conversion Programme £75,000 £112,500 - £37,500
Year 3 totals £727,630 £690,908 £36,392
Review and update of “Home at the Heart”
4.12 All local authorities were asked to provide the Scottish Government with a
written report outlining how they had spent their allocation of Year 3 funding
and progress to date.  
4.13 West Dunbartonshire Council submitted this report in June 2022 and we have
taken this opportunity to fully review and update our existing RRTP to take
account of the progress made in the first three years, the homelessness context
within West Dunbartonshire, the impacts of the remains of the pandemic and
cost of living crisis and the following funding that is available for Year 4:
RRTP Year 4 funding
Year 3 underspend £36,392
SG funding for Year 4 £238,000
Housing and Homelessness contribution £200,000
Year 4 total funding £474,392
4.14 Our fully updated plan is attached as Appendix 1. We have now managed to
mainstream most of the initiatives and enhanced service provision
introduced as part of our Rapid Rehousing Transition Plan. This means that
the £238k funding received from the Scottish Government, along with any

Page 6

underspend from the previous year, can now be used to fund Housing First
in West Dunbartonshire.
Whilst this funding will allow us to scale up Housing First, it will not be to a
level that fully meets identified demand and the service will need to operate
with a targeted capacity.
RRTP Year 4 costings
Housing First West Dunbartonshire £391,109
Pilot Prevention Fund £8,283
Conversion Programme £75,000
Year 4 total cost £474,392
RRTP Year 4 main objectives
4.15 Objective 1: Deliver a whole systems approach to the prevention of
homelessness:
• The implementation of our revised allocations policy and close monitoring
of impact on youth homelessness;
• Recruitment of an additional resettlement officer to ensure that those
young people housed via this route get appropriate support to move into
and sustain their tenancy;
• We will continue to monitor the impact of the pilot prevention fund and
consider options to identify and provide longer term funding;
• Our Enhanced Prevention Service will become more community focussed
and interventions will include an increase in home visits.
4.16 Objective 2: Enable service users with low or no support needs to access
settled housing quickly:
• Reduce time in temporary accommodation for those with no or low
support needs down to 15 weeks by end of Year 4;
• We have updated our modelling and asked all social landlords to agree to
69% of all lets to households experiencing homelessness;
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL 
Year 4
Lets required for to meet demand 986
Split LA 641
Split RSL 345
Projected turnover  Year 4
Split LA 929
Split RSL 500
% Allocation of lets required  Year 4
LA 69%
RSL 69%

Page 7

• This was based on an expected 1150 demand for homelessness during
2022/23.
4.17 Objective 3: Develop interim housing options which enable independent living
and tenancy sustainment:
• Recruit the Senior Housing Development Officer to take forward the
recommendations of the full review of our provision of temporary and
supported accommodation as agreed by the Housing and Communities
Committee in February 2022;
• Senior Supported Accommodation worker post now mainstreamed to
continue to deploy the resources to additional support required with higher
numbers of temporary ongoing since the pandemic due to lower letting
activity;
• Implement our Year 4 Conversion Programme to provide settled
accommodation for more homeless households.
4.18 Objective 4: Implement a Housing First model which enables the most
excluded service users to achieve housing sustainment:
• We have continued with 8 FTE HF Support Workers and removed the
planned increase that would be needed for fully meet identified demand;
• Following feedback from the Housing First Pathfinder and other networking
opportunities we have reduced the HF tenancy set-up costs from £2500 to
£1500;
• Due to available funding we have replaced the annual Housing First
tenancy sustainment budget of £1000 per HF tenancy, with a Diversionary
Activities Budget of £18,000 to cover all HF clients.
4.19 Short-term financial uncertainty remains in terms of our RRTP as at present
Scottish Government funding only covers a 2 year period 2022/23 – 2023/24,
the remainder of the period of our RRTP. Our Year 4 funding allocation of
£238,000 is expected to be the same in Year 5 with no current funding
commitment beyond year 5.
4.20 Despite taking actions to mainstream some elements of our transition plan
within our wider service provision, future sustainable funding for Housing First
remains a key challenge.  With current funding from the Scottish Government
and Housing only sustaining the service until 2023/24 but not being able to
expand to meet demand.
4.21 Whilst we continue to explore long term funding options to continue our
Housing First support service, we are aware of some national discussions
through colleagues within COSLA looking at reviewing funding to deliver
homelessness and housing option services which would include future funding
to deliver the RRTP outcomes.

Page 8

4.22 Recent report from Drug Death Task Force to the Scottish Government notes
one of the Actions (no 26) for funding to continue and expand housing first
(https://drugdeathstaskforce.scot/news-information/publications/reports/final-
report/). 
4.23 Regular progress reports will be provided to the Council’s Housing and
Communities Committee, the Health and Social Care Partnership Board and
the Housing Solutions Partnership, chaired by the Convenor of the Housing
and Communities Committee.
New approaches to homelessness and impacts of Covid-19
HARSAG2
4.24 Due to the risks posed by the Covid-19 the Scottish Government assessed
that the national plan to end homelessness needed to be looked at again and
in June 2020 the Housing Minister asked the Housing and Rough Sleeping
Action Group (HARSAG) to reconvene and look at what more can be done to
tackle homelessness.
4.25 The Scottish Government agreed in principle to all the 105 recommendations
HARSAG made and subsequently published an updated Ending
Homelessness Together Action Plan on 8 October 2020.
4.26 The Scottish Government’s Homelessness Prevention and Strategy Group will
oversee the implementation of this plan. Whilst some of the key
recommendations are directed towards Scottish Government future policy,
some recommendations, such as those around benefits and support for
people regardless of their immigration status, are requests of the UK
Government. 
4.27 In addition, many of the recommendations will require to be delivered by each
individual local authority. Work has been on-going to develop and implement an
action plan in response to these recommendations and the current version of our
“HARSAG2 recommendations tracker” is available as a background paper to this
report.
4.28 We can update the following of the 105 actions;
Action Stage Number of Actions
Actions completed by WDC 73
Actions in progress by WDC 1
Actions not started by WDC 0
Actions requiring Scottish Government action with possible WDC
action
31
TOTAL 105
Local Connection
4.29 The policy intention of suspending local connection referrals between
Scottish local authorities is to remove barriers to support for people who
are homelessness or rough sleeping so they can resettle successfully, and
avoid repeat homelessness. If people are living in an area of their

Page 9

choosing, they are more likely to integrate successfully into a local
community and access the services and support they require.
4.30 The pandemic has delayed this legislation and was due to be laid during
this session of parliament however there are no further timings as the
impact of the Ukrainian Refugee resettlement programme also being
considered. The Scottish Government will monitor the impact of these
changes and respond to any local authorities that report undue pressure
on service provision.
Public Sector duty to prevent homelessness
4.31 Another proposal from HARSAG being taken forward by the Scottish
Government is to look at developing legislation focussed at introducing a
Public Sector duty to prevent homelessness.
4.32 The Scotland Prevention Review Group was convened and has worked with
public bodies, housing providers and other partners to develop proposals for a
new duty on public bodies and delivery partners aimed at the prevention of
homelessness.
4.33 This work was initially due to be completed in the Summer of 2020 though
was delayed by the Covid-19 pandemic. A report was published in February
2021 with a series of recommendations around actions that could be taken to
prevent homelessness and that these should start up to six months before
someone faces losing their home.
4.34 The Scottish Government has committed to consider these proposals and to
work with local authorities over the coming months to seek further input to carry
out further consultation with partners.  We await discussion on and the
introduction of guidance.
4.35 The Scottish Government carried had a consultation open until end of March
2022 for all services to respond on the proposals.  West Dunbartonshire Council
responded to the consultation and encouraged partners to do the same but we
are awaiting outcomes from the consultation.
5. People Implications
5.1 There are no additional people implications in this report.
6. Financial and Procurement Implications
6.1 The Cabinet Secretary for Social Justice, Housing and Local Government
wrote to West Dunbartonshire on 20 December 2021 advising of the Council’s
Rapid Rehousing Transition Plan funding allocation for 2022/23 and 2023/24
of £238k.
6.2 The delivery of the wider Rapid Rehousing Transition Plan will be from within
existing budgets noting the Scottish Government funding for 2022/23, the
contribution from Housing and utilising the underspend from Year 3.

Page 10

6.3 There is further financial uncertainty as at present Scottish Government funding
as funding covers the last 2 years of the RRTP. There is also an expectation
that Housing First becomes a permanent part of all Homeless services
however, there is no committed further funding past 2023/24 to cover part of the
costs and therefore to continue to provide the service and expand to meet
demand requires long term funding.
6.4 There are no procurement implications in terms of this report,
7. Risk Analysis
7.1 There are financial and regulatory risks associated with not being able to fully
deliver our Rapid Rehousing Transition Plan, including the Housing First
element of the approach.
7.2 The decision to award funding in Year 4 and 5 again was based again on a
formula which focuses on homelessness assessments (and not the content of
the RRTP’s), arguably benefits larger local authorities who receive a higher
proportion of homeless assessments and could discourage local authorities
from implementing initiatives aimed at preventing homelessness.
7.3 There is no confirmation of funding for RRTP past Year 5 therefore long term
funding is required to be sourced to continue with the transformation and
continuing our Housing First service.
8. Equalities Impact Assessment (EIA)
8.1 There are no negative equalities impacts due to this update to our RRTP
however preventing and responding to homelessness has a significant
positive impact on individuals and communities.  The aim of the policy is to
create positive impacts to all homeless households, but it is recognised that to
do this equality considerations must be taken into account to meet different
needs and circumstances. Section 2 of EIA 511, details potential positive
impacts for a number of groups and actions to support. No negative impacts
have been identified.
9. Consultation
9.1 The first draft of our RRTP was developed in collaboration with key partners,
including the Health and Social Care Partnership, local Registered Social
Landlords and third sector organisations, via a series of well attended
stakeholder events held in November and December 2018.
9.2 Consultation and communication have continued since the submission of the
first iteration of the RRTP through the Housing Solutions Partnership.  Further
engagement has also taken place with other local landlords via the Strategic
Housing Providers Forum, engagement has continued with the Health and
Social Care Partnership and also a dialogue with the WDTRO regarding the
implementation of the RRTP and Housing First has also taken place.
10. Strategic Assessment

Page 11

10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities.
Peter Barry
Chief Officer, Housing and Employability
Date: 9 August 2022
___________________________________________________________________
Person to Contact:  John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability:  telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk 
Appendices: 1: WDC RRTP Year 2 update; June 2022
2: RRTP monitoring report, activity and funding; June 2022
Background Papers: RRTP Equalities Impact Assessment
RRTP Delivery Action Plan – June 2022
Ending Homelessness Together updated action plan;
Scottish Government October 2020
https://www.gov.scot/publications/ending-homelessness-
together-updated-action-plan-october-2020/ 
West Dunbartonshire Council’s Revised Rapid Rehousing
Transition Plan including Action Plan and Equalities Impact
Assessment, Home at the Heart 
Housing and Communities Committee Report 7th
November 2018 “Rapid Rehousing Transition Paper
position paper” 
Housing and Communities Committee Report 6th February
2019 “Rapid Rehousing Transition Plan 2019/20 to
2023/24””
Housing and Communities Committee Report 14th August
2019 “Rapid Rehousing Transition Paper 219-24 update
report”
Housing and Communities Committee Report 5th February
2020 “Rapid Rehousing Transition Plan and new
approaches to homeless update”
Housing and Communities Committee Report 2nd
September 2020 “New approaches to homelessness
update report – “More than a Roof 2017-20” final report and
“Home at the Heart 2019-24” Year 1 update on our Rapid
Re-housing Transition Plan”

Page 12

Housing and Communities Committee Report 3rd February
2021 “Rapid Re-housing Transition Plan and new
approaches to homelessness update report”
HARSAG2 recommendations tracker, West Dunbartonshire
Council Housing Development and Homelessness Team,
June 2021
Housing and Communities Committee Report 2nd February
2022 “Rapid Re-housing Transition Plan and new
approaches to homelessness update report”
Letter from Kevin Stewart, MSP, Minister for Local
Government, Housing and Planning on Distribution of
Funding for Rapid Rehousing Transition Plans for 2021/2;
10 December 2020
Letter from Kevin Stewart, MSP, Minister for Local
Government, Housing and Planning on Additional Funding
for Rapid Rehousing Transition Plans for 2020/1; 18
December 2020 
Letter from Shona Robson, MSP, Cabinet Secretary for
Social Justice, Housing and Local Government on
Distribution of Funding for Rapid Rehousing Transition
Plans for 2022/3 and 2023/24; 20 December 2021
Wards Affected:   All