Democracy Spraffa

Supplementary Document Pack (Housing and Communities 24 08 22) Bookmarked

West Dunbartonshire Council · 24 August 2022
Back to Housing & Communities Committee — 24 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Supplementary
Agenda
Housing and Communities
Committee
Date: Wednesday, 24 August 2022
Time: 10:00 a.m.
Format: Hybrid Meeting
Contact:   Email: committee.admin@west-dunbarton.gov.uk
Dear Member
ITEMS TO FOLLOW
I refer to the agenda for the above meeting that was issued on 11 August 2022 and
now enclose copies of Items 12, 13, 14 and 15(b) which were not available for issue
at that time. 
Yours faithfully
PETER HESSETT
Chief Executive
Page 145

Page 2

Note referred to:-
12 UK SHARED PROSPERITY FUND 149 - 158 
Submit report by the Chief Officer, Housing and Employability highlighting the
launch of the UK Shared Prosperity Fund (UKSPF) and outlining a proposed
approach for West Dunbartonshire Council input into the Glasgow City
Region Investment Plan. 
13 HOUSING REVENUE ACCOUNT BUDGETARY CONTROL 159 - 178
REPORT TO 31 JULY 2022 (PERIOD 4) 
Submit report by the Chief Officer, Resources providing an update on the
financial performance to 31 July 2022 (Period 4) of the HRA revenue and capital
budgets for 2022/23.
14 FINANCIAL REPORT 2022/23 AS AT PERIOD 4 179 - 190
(31 JULY 2022)
Submit report by the Chief Officer, Resources providing an update on the
financial performance to 31 July 2022 (Period 4) of those services under the
auspices of Housing and Communities Committee.
15 SCRUTINY REPORTS
(B) SCOTTISH FIRE AND RESCUE – WEST DUNBARTONSHIRE 191 – 210
PERFORMANCE REPORTS - QUARTERS 4 AND 1
Submit reports by Local Senior Officer, Scottish Fire and Rescue Service
providing appropriate performance data measured against priorities in the West
Dunbartonshire Local Fire and Rescue Plan for Quarter 4 (1 January to 31 March
2022) and Quarter 1 (1 April to 30 June 2022)
Page 146

Page 3

Distribution:- 
Councillor Diane Docherty 
Councillor Ian Dickson 
Councillor Craig Edward (Chair)
Councillor Gurpreet Singh Johal 
Councillor David McBride
Councillor Jonathan McColl
Councillor Michelle McGinty
Councillor Jim McElhill
Councillor John Millar (Vice Chair)
Councillor Lawrence O’Neill
Councillor Martin Rooney
Councillor Sophie Traynor 
All other Councillors for information 
Chief Executive
Chief Officer - Housing and Employability
Chief Officer - Regulation and Regeneration
Chief Officer - Supply, Distribution and Property 
Date issued: 18 August 2022  
Page 147

Page 4

Page 148

Page 5

WEST DUNBARTONSHIRE COUNCIL
Report by Strategic Lead Housing and Employability  -
Housing and Communities Committee: August 2022
___________________________________________________________________
Subject: UK Shared Prosperity Fund
1. Purpose
1.1 To highlight the launch of the UK Shared Prosperity Fund (UKSPF) and to
outline a proposed approach for West Dunbartonshire Council input into the
Glasgow City Region Investment Plan.
2. Recommendations
2.1 It is recommended that the Committee:
a) Note the publication of the UKSPF prospectus including the associated
financial allocations
b) Note the general approach to the development of the Glasgow City
Region Investment Plan
c) Note the general approach for the proposed allocation of resources.
3. Background
3.1 The UK Shared Prosperity Fund (UKSPF) is the UK Government’s main
funding to replace European Union (EU) Structural Funds.
3.2 Although the concept of the UKSPF was first outlined in 2017, very little
substantive information was made available until some ‘pre-launch guidance’
was published in February 2022. This was followed up by the publication of a
full prospectus in April 2022 by the UK Government.
3.3 The prospectus for the fund outlines the overarching aims to build pride in
place and increase life chances. The three year fund has three core
investment priorities that will guide the development of activities and how the
funds should be allocated.
Core Investment Priorities
3.3 The core investment principles are:
• Communities and Place - to enable places to invest to restore their
community spaces and relationships and create the foundations for
economic development and build resilient and safe neighbourhoods
through targeted investment and crime prevention.
• Supporting Local Business – to enable places to fund interventions
that support local businesses to thrive, innovate and grow. This
includes visible improvements to local retail, hospitality and leisure
sector facilities and targeted support for small and medium sized
businesses to undertake new to firm innovation, adopt productivity
ITEM 12
Page 149

Page 6

enhancing energy efficient and low carbon technologies and
techniques.
• People and Skills – to reduce the barriers some people face to
employment and support them to move towards employment; reduce
levels of economic inactivity through investment in bespoke intensive
life and employment support tailored to local need; and provide skills
development through a wider range of routes.
3.5  There is no expectation placed on lead authorities to deliver activity against all
of the core investment principle areas.  However, there is a clear UK
Government expectation that a minimum of 13% of the budget is allocated to
a capital project.  Our proposal is closer to 30%. In addition to this, funding
has been ring-fenced and allocated to ‘Multiply’, the national programme to
increase levels of functional numeracy that aims to increase the levels of
numeracy in the adult population. 
3.6 Each of the core investment priorities and multiply has a set of interventions
with associated outputs and outcomes that have to be achieved and reported
on. Further information about the UK Shared Prosperity Fund is published in
the Prospectus which can be found at:
UK Shared Prosperity Fund: prospectus - GOV.UK (www.gov.uk) 
Process and Timetable
DATE ACTIVITY
13 April 2022 Fund Launch
April-May 2022 Engagement sessions with local authorities and other
local partners to support the investment plan process.
April-June/July
2022
Lead local authorities work with stakeholders to develop
local investment plans.
Summer 2022 Further guidance published including guidance on
monitoring benefits and evaluation, assurance, subsidy
control, branding and publicity.
1 August 2022 Deadline for submission of investment plans to the UK
Government.
August -October
2022
Indicative investment plan assessment period for UK
government.
October 2022
onwards
Anticipated date for first investment plans to be
approved.
October 2022
onwards
Anticipated first payment to be made to lead local
authorities.
31 March 2025 Three year funding period ends 
4. Main Issues 
4.1 The UK Government has designed a menu of interventions within each
principle investment area that local areas can choose to select from.
Alternatively, new options that suit the local area can be designed with the
condition that they are consistent with the SPF overarching aims. The funds
Page 150

Page 7

will be made available on the basis of a local investment plan that sets out
local priorities and proposals for action. 
Approach and Funding
4.2 Lead authorities (West Dunbartonshire Council) are strongly encouraged to
collaborate with their neighbouring authorities to develop regional investment
plans. West Dunbartonshire is working in partnership with Glasgow City
Region Partners. 
4.3 A Glasgow City Region Head of Shared Prosperity Fund has been appointed
and a working group of the UKSPF Officer leads in each local authority
established and now meets on a regular basis to take the Regional
Investment Plan forward.
4.4 The UK Government has established a notional allocation of funds to the City
Region. 
GLASGOW CITY REGION  
Year 2022/23 2023/24 2024/25 Total
Revenue £6,645,717 £12,979,919 £31,908,645 £51,534,281
Multiply £3,856,889 £4,450,258 £4,450,258 £12,757,405
Capital £771,378 £1,854,274 £6,956,940 £9,582,593
TOTAL £11,273,984 £19,284,451 £43,315,843 £73,874,279
WEST DUNBARTONSHIRE ALLOCATION
4.5 West Dunbartonshire share has been allocated by the UK Government in
proportion to the population and level of need. West Dunbartonshire has been
awarded a notional allocation up to £3,895,815. 
4.6 It is expected that each area will allocate a minimum of approximately 13% of
the core funding to capital investment over the three years of the programme.
In West Dunbartonshire this equates to approximately £505,345 of the
£3,895,815 allocation. The capital funds should be allocated as a proportion
of core funds allocated to each year.
4.7 The guidance published by the UK Government suggests programmed spend
over three years in West Dunbartonshire.
Year £ 2022/23 £ 2023/24 £ 2024/25  £ Total
Core 391,146 782,292 2,049,606 3,223,044
Multiply 203,396 234,688 234,688 672,771
Total 594,542 1,016,980 2,284,294 3,895,815
Minimum
Capital
spend (as
% of core)
40,679 97,787 366,879 505,345
Taking UKSPF Forward in West Dunbartonshire
4.8 In West Dunbartonshire we have aimed to develop interventions in all three
investment priority areas. We have established a sequential approach for
identifying the appropriate mix of priorities that are consistent with the outputs
Page 151

Page 8

and outcomes set out by the UKSPF guidelines. This approach prioritises and
builds on existing commitments. This includes:
• Reviewing existing activity where continuity beyond European
Structural fund end dates is an issue and identify what can be
supported through UKSPF. For example the current employability
service is delivered with European Structural Funds that end in June
2023;
• Review existing plan priorities and consulting with stakeholders and
partners to identify eligible activity from those plan priorities that could
be delivered within the budget constraints.
4.9 Existing plan priorities that we will draw on in West Dunbartonshire include:
• Community Planning Priorities;
• Council Economic/Regeneration/Wealth Building Plans;
• Local Plan 2;
• Business Development Strategy;
• Employability Partnership 3-year plan;
• Community Learning and Development 3-year Plan;
• Community Empowerment Plan.
4.10 We have established a team to develop our proposals for the SPF. The team
consists of lead officers from:
• Working4U with overall lead and responsibility for People and Skills
priority and Multiply;
• The Communities Team and Regeneration Services for Communities
and Place priority and capital projects;
• Business Services for the Supporting Local Business priority.
4.11 Consultation on the input to the Regional Investment Plan will primarily, but
not exclusively, be carried out through the existing partnership networks in
West Dunbartonshire Community Planning and associated Delivery
Improvement Groups. 
4.12 This will also include consultation with existing partnerships that are co-
ordinating business/regeneration, employability, communities and community
learning and development plans and activities. This includes groups such as:
• West Dunbartonshire Local Strategic Employability Partnership;
• West Dunbartonshire Local Adult Learning Partnership;
• West Dunbartonshire  Communities Team/ Community Empowerment
Networks;
• Working4Business Networks. 
4.13 Through our approach and taking into account existing commitments and UK
Shared Prosperity guidance on eligible activity we are proposing the following
investment allocations to the UKSPF priorities. 
Page 152

Page 9

Priority £Total % of core Activity (Outcome indicator number)
Community
and Place
944,222 30% • Shopfront and Small Business
Improvement Grants (S1);
• Pride in Place – Supporting
Community Gardens  4 sites
(S3);
• Improvement and upgrade of
CCTV Infrastructure (S4)
• Community Pantry Network (S9),
Community Consultation (S9),
Community based
communication (S9).
Business 500,000 16% Grant based initiatives for:
• Enhancing West
Dunbartonshire’s Tourism
Events & Attractions (S14);
• Business Recovery & Growth
(S15);
• Towards Net Zero (S15);
• Expert Help for Businesses
(S20);
• Early Stage Growth (S25);
People and
Skills 
1,728,824 54% • Employment support for
economically inactive people
(S31);
• Employability programmes &
advice - No One Left Behind
agenda (S35);
• Competitive grant fund for
specialist employability support
and local skills needs (S36);
• Case managed support for
young people (S39);
• Programme management and
admin.
Multiply 672,771 Ring
fenced by
UKSPF
Guidelines
• Courses designed to increase
confidence with numbers (S42);
• Courses aimed at encouraging
people to upskill to access
jobs/careers (S45);
• Additional relevant maths
modules in vocational courses
(S46);
• Innovative programmes
delivered with employers (S47);
Page 153

Page 10

Priority £Total % of core Activity (Outcome indicator number)
• Intensive& flexible courses
targeted at those without Level 5
maths (S48);
• Courses designed to help
people use numeracy to manage
money (S49);
• Provision developed in
partnership with community
organisations (S51).
Total 3,845,817   
5. People Implications 
5.1 The UK Shared Prosperity Fund (UKSPF) is the UK Government’s main
method replacing for EU Structural Funds. In West Dunbartonshire European
Social Funds are used to deliver three components; each with specific
activities and 35 employees. These are:
• European Strategic Intervention – managing the monitoring and
reporting of outcomes, approximately 7FTEs;
• ESF Pipeline – Employability service case management and
employability support provision, approximately 19 FTE’s;
• ESF (Poverty and Social Inclusion) – family opportunity hub support
focussing on supporting families likely to be affected by child poverty, 9
FTE’s and contracted specialist provision.
5.2 We have developed a range of UKSPF ‘People and Skills’ proposals that,
while consistent with UKSPF priorities, centre on maintaining the existing
teams and some of the targeted activity. Should these activities be endorsed
by UKSPF it will ensure continuity of some of our key employability service
provision and family opportunity hub services.
5.3 Within our proposals for ‘Multiply’ we have proposed a range of new activity
that will require additional staff (4*specialist Maths Tutors). The maths tutors
will ‘take maths to the community’ and, using a ‘social practice’ model, work
with individuals, community groups, employers and health and social
care/community justice partners. 
5.4 There are no significant people implications (staffing) within our Communities
and Place proposals or Business Support activities. 
6. Financial and Procurement Implications 
6.1 The UKSPF provides access to £3.8m of funds to be used over the period
from 2022 to March 2025. The funding will be made available after the
acceptance/approval of the ‘Regional Investment Plan’ which will be
submitted to the UK Government in draft form in August 2022. It is unlikely
Page 154

Page 11

that the approval process will be complete and funds made available before
November. Activity is therefore likely to begin in January at the very earliest. 
6.2 Funding proposals within Communities and Place includes the provision of
grants for the improvement of shop fronts that will require a grant process to
be applied.  Also included as part of the Communities and Place is the
upgrade of CCTV, this will require a procurement process to be implemented. 
6.3 The contract strategy for CCTV network upgrade will be produced by the
Corporate Procurement Unit in close consultation with the Communities
Team.  The contract strategy will develop existing feasibility studies to include:
contract scope, service forward plan, the market, procurement model, roles
and responsibilities, risks, issues and opportunities and ongoing contract
management.  
6.4 The CCTV Network will contribute to delivery of the Council strategic priorities
through empowered communities and Community Planning West
Dunbartonshire ‘Safe Communities’ priorities. Further opportunities to
maximise the positive social, economic and environmental impact for West
Dunbartonshire through the contract will also be explored, through the use of
Community Benefit Clauses.
6.5 The Local Business Support centres on the provision of grants to support
business development. Existing grant processes for distribution of business
development grants will be used to manage these developments. 
6.6 People and Skills proposals focus on continuity of existing European funded
projects. However, our proposal includes provision for the commissioning of
external specialist provision. This will include the provision of access to sector
skill development and vocational and non-vocational qualifications. We have
an existing competitive grant process that will be used for the purpose.
6.7 Multiply proposals are predicated on the use of existing and new specialist
staff. Where relevant, for example to develop specialist interventions to
support participants to secure the appropriate level 5 qualifications, we will
work with the members of the Adult Learning Partnership, particularly West
College Scotland, as a strategic partner. There will be limited requirement, if
any, for procurement or acquisition of services through grants. We will use
existing grant processes if additional services are required to meet service
demands. 
7. Risk Analysis 
7.1 Risk management is an ongoing process that is considered by the lead
officers developing the West Dunbartonshire proposals, as such we have
developed our proposals while managing a number of risks, including for
example:
• Risk: The development of a Regional Investment Plan and UK
Government assessment process takes longer than expected and
UKSPF grant is not available until after January 2022. Mitigation: We
have programmed spend over three years and have negotiated some
Page 155

Page 12

carry forward for 2022 spend. We will not begin any UKSPF activity
until we receive the UKSPF grant award, ESF employability services
will continue until June 2022, reducing the immediate need for UKSPF
grant to meet employability staff costs;
• Risk: We have assumed that the business related grants will generate
match income from businesses. However, economic circumstances
may reduce the attractiveness of grants that require match. Mitigation:
We will assess the circumstances when developing the grant process
and modify grant award levels to ensure full take-up.
• Risk: Multiply activity centres on the recruitment of specialist staff. All
local authorities will be utilising Multiply funds, many in a similar way.
Recruitment issues may delay the start of the project. – To mitigate this
we will develop appropriate recruitment documentation in advance of
the grant award. This way we will be able to respond quickly and recruit
effectively.
7.2 There are a number of risks being managed at a regional level, these centre
on the eligibility and definitions of some activity and target groups for the
investments.  Mitigation. A senior officer group has been established at a
regional level to discuss and clarify any emerging issues prior to the
submission of the Regional Investment Plan. 
8. Equalities Impact Assessment (EIA) 
8.1 Equalities legislation requires that new or significantly changing policies or
services and financial decisions should be subject to an assessment of their
impact on the wellbeing of certain groups of people.  In addition to the
equalities categories, the Council needs to have due regard to the reducing
inequalities of outcome that result from socio-economic disadvantage. 
8.2 We have conducted an equalities screening and found there is a positive
equalities impact and an Equalities Impact Assessment (EIA) has been
carried out.  The EIA, which is listed as a background paper, found there to be
a positive impact on the equalities groups. 
8.3 The UK Shared Prosperity Fund will support activity that aims to:
• Boost productivity, pay, jobs and living
• Spread opportunities and improve access to public services 
• Restore a sense of community safety, pride and belonging 
• Empower local leaders and communities.
8.4 The approach to the development of the UK Shared Prosperity fund
programme in West Dunbartonshire focuses on supporting those that would,
under normal circumstances, face obstacles or barriers preventing them from
full participation in socio/economic life. This includes specific focus on people
with limited qualifications and work experience, people with lived experience
of disadvantage, disabled people, those experiencing mental health issues,
people from BME backgrounds, parents, those aged 50+ and young people. 
Page 156

Page 13

8.5 In addition, we have given due regard to our socio-economic duty by
considering the effects of our decisions on inequality particularly where this
can address inequalities of outcome, such as poorer skills and attainment;
lower quality, less secure and lower paid work;  and reducing the chance of
being a victim of crime. 
8.6 We will address this duty by:
• Supporting people to obtain the skills that will help them to seek and
secure employment;
• Supporting people to obtain the skills that will help them to make
informed decisions about their community;
• providing access to skills development and maths skills; 
• work with local business and assist them to develop and provide
opportunities as well as encouraging fair work practices; 
• supporting safe communities by reducing crime through the
development of an effective CCTV network. 
9. Consultation 
9.1 Consultation on the input to the Regional Investment Plan has been carried
out through the existing partnership networks in West Dunbartonshire
Community Planning and associated Delivery Improvement Groups. 
9.2 This includes consultation with existing partnerships that are co-ordinating
business/regeneration, employability, communities and community learning
and development plans and activities. This includes groups such as:
• West Dunbartonshire Local Strategic Employability Partnership;
• West Dunbartonshire Local Adult Learning Partnership;
• West Dunbartonshire  Communities Team/ Community Empowerment
Networks;
• Working4Business Networks.
9.3 Consultation will be maintained as part of the delivery of West Dunbartonshire
UKSPF programme services. This will also form part of the development of
our monitoring and reporting framework  and design of service provision. 
10. Strategic Assessment 
10.1 The proposed approach to the use of UK Shared Prosperity Funds is
consistent with the aim to develop a strong local economy and improved
employment opportunities which features as one of the Council’s five main
strategic priorities for 2017 - 2022 are as follows:
10.2 Our proposal within the context of the ‘People and Skills’ and ‘Multiply’
priorities is consistent with this strategic aim as they will support people who
face barriers to opportunity to address those barriers obtain access to skills
development and learning support and secure employment. 
Page 157

Page 14

10.3 This is reinforced by our proposals to support local business creation and
growth through the provision of grants that will improve business frontages;
assist business to develop ‘Net Zero’ activity; and support efforts to develop
tourist attractions. 
10.4 Through our communities and place activity we will establish methods for
meaningful community engagement with active empowered and informed
citizens who feel safe and engaged. 
Name  Stephen Brooks
Designation Working4U Manager
Date:  07/07/2022 
Person to Contact: Stephen Brooks Working4U Manager, 079643950131,
Stephen.brooks@west-dunbarton.gov.uk 
Appendices: There are no appendices. 
Background Papers: Equalities Impact Assessment number 514. West
Dunbartonshire UK Shared Prosperity Fund 
Wards Affected: The proposals within the report affect all council Wards. 
Page 158

Page 15

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Housing and Communities Committee : 24th August 2022
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 31 July 2022 (Period 4)
1. Purpose
1.1 The purpose of the report is to provide members with an update on the
financial performance to 31 July 2022 (Period 4) of the HRA revenue and
capital budgets for 2022/23.
2. Recommendations
2.1 Members are asked to:
i) note the revenue analysis shows a projected annual favourable variance
of £0.008m; and
ii) note the net projected annual position in relation to the capital plan is
highlighting an in-year adverse variance of £0.319m ( 0.43%) as detailed
in Appendix 4.
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23 and a total budget of £47.018m.
Capital
3.2 At the meeting of Council on 9 March 2022, Members also agreed the
updated Capital Plan for 2022/23 which has been augmented by slippage
from 2021/22 to produce a total planned spend for 2021/22 of £65.567m.
4. Main Issues
Revenue
4.1  The budgetary position for HRA Revenue is provided in Appendix 1 with
information on projected variances valued at more than £0.050m being
provided as Appendix 2, and shows a projected favourable variance of
£0.008m.
ITEM 13
Page 159

Page 16

Capital 
4.2 The HRA capital summary position is shown in Appendix 3.  Information on
projects that are highlighted as being within the Amber category is provided in
Appendix 4 and Appendix 5 provides information on the projects at Green.  A
summary of anticipated resources is shown in Appendix 6. The analysis
shows that there is currently a projected in-year adverse variance of £0.319m.
4.3 From the analysis within the appendices it can be seen that there are no
projects reporting slippage at this stage.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year.  This can
affect all service areas.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Housing management and Legal services have been
requested on this report and both have advised there are neither any issues
nor concerns with the proposal.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Page 160

Page 17

Laurence Slavin
Chief Officer – Resources
Date: 15 August 2022
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner (HEED),
16 Church Street, Dumbarton, G82 1QL,     
telephone: 01389 737704, e-mail janice.rainey@west-
dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue) 
Appendix 3 - Budgetary Position (Capital)
Appendix 4 - Variance analysis Amber Projects (Capital)
Appendix 5 - Variance analysis Green Projects (Capital)
Appendix 6 - Resources (Capital)
Appendix 7 - Analysis of Affordable Housing Supply 
Programme (Capital)
Background Papers: None
Wards Affected: All
Page 161

Page 18

Page 162

Page 19

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2022/23
PERIOD END DATE
Subjective Summary
Total Budget
2022/23                         
£000
Spend to
Date
2022/23 
£000
Forecast
Spend
£000
Annual RAG
Status
Employee Costs 6,690 1,936 6,832 142 2% 
Property Costs 2,030 504 2,000 (30) -1% 
Transport Costs 112 42 133 21 0% 
Supplies, Services And Admin 395 72 382 (13) -3% 
Support Services 2,724 845 2,536 (188) -7% 
Other Expenditure 532 346 580 48 9% 
Repairs & Maintenance 12,942 820 12,432 (510) -4% 
Bad Debt Provision 1,060 302 923 (137) -13% 
Void Loss (Council Tax/Lost Rents) 857 630 1,549 692 81% 
Loan Charges 19,676 6,559 19,676 0 0% 
Total Expenditure 47,018 12,056 47,043 25 0% 
House Rents 45,215 12,756 45,215 0 0% 
Lockup Rents 210 57 207 3 1% 
Factoring/Insurance Charges 1,316 436 1,307 9 1% 
Other rents 115 27 116 (1) -1% 
Interest on Revenue Balance 55 3 10 45 82% 
Income from Reserves 0 0 60 (60) 0% 
Miscellaneous income 107 41 136 (29) -27% 
Total Income 47,018 13,320 47,051 (33) 0% 
Net Expenditure 0 (1,264) (8) (8) 
Forecast Variance 2022/23                          
£000               %
31 July 2022
Page 163

Page 20

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 July 2022
PERIOD 4
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
EMPLOYEE COSTS 6,690 6,832 142 2% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPORT SERVICES 2,724 2,536 (188) -7% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
The need for additional staffing is regularly reviewed and will be reduced when service
requirements allow.
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
£60K of this adverse variance relates to the increased pay awarded to caretakers  following 
job evaluation panel on 7 April.  This is offset by a transfer from HRA service improvement
reserve which is shown in the income section . The remaining variance is due to additional
temp posts being added to assist with backlogs/ staff absences. 
A favourable variance is expected with the assumption that the 2022/23 forecast outturn for
support services is expected  to be in line with the 2021/22 outturn adjusted for pay uplifts
etc. This charge is calculated each year end based on HRA's percentage usage of the total
cost of WDC support services. The 2022/23 HRA budget was set before this 2021/22
outturn was known so was based on 2020/21 charge which was higher.
Budget Details Variance Analysis
Subjective Analysis forecast Variance
A year end overspend is anticipated
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers central support recharges to the HRA
Variance Narrative
Subjective Description
A year end underspend is anticipated
Page 164

Page 21

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 July 2022
PERIOD 4
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
REPAIRS & MAINTENANCE 12,942 12,432 (510) -4% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
BAD DEBT PROVISION 1,060 923 (137) -13% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
The favourable variance within Repairs & Maintenance is due to a couple of factors.  The
first being other maintenance relating to Gas Maintenance, Lift Maintenance etc. is expected
to be lower than anticipated at time of budget setting when comparing to previous years
trends.  The second factor, similarly when looking at previous years trends we can expect
the recoveries from owners to be higher than anticipated at time of budget setting.  These
combined results in the projected favourable variance in 2022/23.
Variance Narrative
This budget covers all repair and maintenance expenditure to houses and lockups
A year end underspend is anticipated
A year end underspend is anticipated
Variance Narrative
The Bad Debt Provision expected to be required for 2022/23 is less than estimated at time
of budget setting, resulting in a favourable variance. This assumes that the provision
required in 22/23  will be similar to the 21/22 provision.
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Page 165

Page 22

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 July 2022
PERIOD 4
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
VOID LOSS 857 1,549 692 81% 
Main Issues
Mitigating Action
Anticipated Outcome
A void working group has been reviewing the issues and have been implementing actions
and working with Housing Maintenance managers to improve the situation and it is expected
that the void figures will start to decrease significantly over the next few month
Subjective Analysis forecast Variance
Service Description
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
A year end overspend is anticipated
Variance Narrative
The main reason for the projected adverse variance relates to the number of void properties
being higher than expected at time of budget setting. The budget was set on the assumption
that backlogs following COVID delays  in getting voids turned around would be resolved
early in year however the  numbers continue to be high .
Budget Details Variance Analysis
Page 166

Page 23

APPENDIX 3
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 4
Spend to
Date Spend to Date
£000 £000
Red
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Amber
2 7.7% 1,679 31.9% 2 7.7% 1,668 31.7%
Green
24 92.3% 3,577             68.1% 24 92.3% 3,587                68.3%
26 100% 5,256 100% 26 100% 5,256 100%
Budget Spend to
Date
Forecast
Spend Forecast Variance Budget Spend to Date Forecast
Spend
Forecast
Variance Slippage Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
0 0 0 0 0 0 0 0 0 0
115,267 1,679 115,767 500 41,645 1,668 42,145 500 0 500
100,816 3,577 100,636 (181) 23,922 3,587 23,742 (181) 0 (181)
216,084 5,256 216,403 319 65,567 5,256 65,887 319 0 319
216,084 5,256 216,403 (319) 65,567 5,256 65,887 (319)
0 0 0 0 0 0 0 0
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in
completion (although this is unquantifiable at present) or the project
has any issues that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the
forecast stages in the project life cycle and no issues are anticipated
at this time
TOTAL EXPENDITURE
The in-year adverse variance reflects the 20/21 Scottish Government grant in relation to future developments which cannot be drawndown prior to spend (£0.850m).  This is offset by £0.511m additional  Scottish Government Grant income which is generated off of the Buy Back Scheme and can be used to support the Affordable Housing Supply Programme.  Overall, there is a favourable project life variance of £0.702m which relates to an additional £1.308m grant income as successfully negotiated by Officers in relation to the increased grant per unit at Aitkenbar and Haldane and the additional grant generated from the buyback scheme within the current year and previous financial years.  However,  this is offset by an under recovery in grant of £0.606m which reflects changes to the actual number of units compared to budget at individual sites and the change in funding composition at St Andrews whereby the grant was originally budgeted higher based on a partnership with another registered social landlord.   However, disc
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the
forecast stages in the project life cycle and no issues are anticipated
at this time
31 July 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at RAG
Status
Red
Projects are forecast to be overspent and/or experience material
delay to completion
Amber
Projects are either at risk of being overspent and/or delay in
completion (although this is unquantifiable at present) or the project
has any issues that require to be reported at this time
Green
Page 167

Page 24

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF AMBER PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 8,384 660 8% 8,884 500 6%
Current Year Financials 2,000 660 33% 2,500 500 25%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 106,883 1,019 1% 106,883 0 0%
Current Year Financials 39,645 1,008 3% 39,645 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL OF AMBER
PROJECTS
Project Life Financials 115,267 1,679 1% 115,767 500 0%
Current Year Financials 41,645 1,668 4% 42,145 500 1%
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Void house strategy programme
Spend on Void Properties to bring them up to letting standard 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Void works to continue into 22/23 to bring void properties up to a lettable standard.  The high number of voids has led to a
higher than expected demand for this budget, resulting in a projected overspend in 22/23. 
Mitigating Action
None available at this time
Anticipated Outcome
Void properties to be brought up to lettable standard
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Progress will continue to be monitored as the year progresses.  The project has been moved into amber due to issues around
the Clydebank East site. Following additional and more detailed site investigations it now appears likely that there will be
significant additional costs to deliver the ground remediation strategy.  These additional costs place the development at risk due
to affordability issues.  It is expected full information to make an assessment will be available in early September and  an update
will be given to the Housing and Communities Committee when this has been achieved . Site specific updates as follows:-
Clydebank East - 88 units to be completed on the site.  Estimated Start Date October 2022 and estimated completion October
2024.  Full planning received and Officers are working through the planning conditions site with start date anticipated October
2022, subject to costs which will be received August 2022.
Queens Quay Site B - 29 units to completed on the site with site completion expected August 2022.  Rental income forecast
from end of September 2022.
Affordable Supply Programme
Affordable Housing Supply Programme
Bonhill Gap Site - 32 units to be completed on site.  Estimated start date April 2023 and estimated completion October 2024. 
The project is currently at design stage.
Mitigating Action
None required at this time
Anticipated Outcome
Project to complete and meet revised spend targets
Queens Quay Site C - 20 units to be completed on site.  Estimated start date March 2023 and estimated completion March
2024.
Pappert - 27 units to be completed on site.  Estimated completion early  2023.  Officers currently working on the design and
build contract.
Bank Street - 20 units to be completed on the site.  Estimated start date July 2023, estimated completion July 2024.  Project is
currently at feasibility stage.
Clydebank Health Centre - Units on site to be confirmed.  Acquisition to be agreed with NHS on agreement of purchase cost. 
Willox Park Phase1 - 17 units to be completed on site.  Estimated start date March 2023 and estimated completion March. 
17/18 units demolition complete, and site investigation under way.  Officers ready to submit to for full planning.
Mount Pleasant - 25 units to be completed on site.  Estimated start date March 2023 with estimated completion March 2024. 
Demolition of current site to go to the August 2022 tendering committee.
Page 168

Page 25

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,487 0 0% 2,487 0 0%
Current Year Financials 474 0 0% 474 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 2,266 0 0% 2,266 0 0%
Current Year Financials 431 0 0% 431 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials 1,557 0 0% 1,557 0 0%
Current Year Financials 664 0 0% 664 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
4
Project Life Financials 271 0 0% 271 0 0%
Current Year Financials 185 0 0% 185 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No issues. Development of QL system to carry on through 22/23.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
QL Development
This budget relates to the costs associated with the development of the Integrated Housing
Management System
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
A number of priority initiatives, supported by the Better Homes Project Board,  are being investigated and are envisaged to have
a positive impact on the current council housing stock and budget, with works expected to progress in 22/23.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
None required
Anticipated Outcome
Full budget spend
Capitalised minor works
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date 
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
Special needs adaptations
Page 169

Page 26

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 170 0 0% 170 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
6
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
7
Project Life Financials 192 0 0% 192 0 0%
Current Year Financials 192 0 0% 192 0 0%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Awaiting receipt of the airport scheme outline from Glasgow Airport before works can planned.  Project expected to make
progression in 22/23.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Airport Noise
Noise Insulation Project
Community Safety Projects
Community Safety Projects 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Gypsy Travellers Site
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date
Page 170

Page 27

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
8
Project Life Financials 19,841 0 0% 19,841 0 0%
Current Year Financials 4,455 0 0% 4,455 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
9
Project Life Financials 17,607 1,654 9% 17,607 0 0%
Current Year Financials 4,955 1,654 33% 4,955 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
10
Project Life Financials 10,963 109 1% 10,963 0 0%
Current Year Financials 2,500 109 4% 2,500 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
11
Project Life Financials 257 0 0% 257 0 0%
Current Year Financials 75 0 0% 75 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as
identified and recommended from the housing stock condition survey. 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Project is anticipated to meet revised targets.  Additional external support will be available from August to assist with window
installs.
Mitigating Action
None required at this time
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Doors/window component renewals
Doors/Windows Component Renewals
Roof Coverings
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Currently behind monthly targets, however tentatively anticipated to meet full spend and targets. Current tiled roof progress is
behind cumulative monthly targets but overall output is anticipated to increase with the new metal and flat roof framework
contract coming on board contributing to a wider range of roof types being completed.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Current progress is slightly behind cumulative monthly targets, work is
progressing and additional resources will be coming on board shortly with new framework contractor.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Targeted SHQS /EESSH compliance works
This budget is to focus on work required to maintain the SHQS compliance and energy
efficiency  with WDC housing stock.   
Planned End Date  Forecast End Date
Page 171

Page 28

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
12
Project Life Financials 273 35 13% 273 0 0%
Current Year Financials 91 35 39% 91 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
13
Project Life Financials 566 65 11% 566 0 0%
Current Year Financials 108 65 60% 108 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
14
Project Life Financials 5,092 295 6% 5,092 0 0%
Current Year Financials 969 295 30% 969 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
Anticipated to meet full spend and targets and possibly overspend. This budget has overspent in recent years as demand has
exceeded expectations. Current progress continues this trend however an industry wide shortage in microchips is likely to hinder
availability of boilers and in turn will impact on spend. Due to the nature of this project (ensuring heating and hot water
availability) there is no option for a conscious reduction of installs.
Mitigating Action
None available
Anticipated Outcome
Full budget spend, possible overspend.
Anticipated Outcome
Full budget spend
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition
survey and renewal of obsolete/damaged boilers. 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Mitigating Action
Officers continue to liaise with owners to encourage agreement for install.
Anticipated Outcome
Anticipated not to meet full spend despite best efforts.
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply with
the relevant standards / legislation / health and safety in relation to housing stock.
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and
recommended from the housing stock condition survey and appropriate council officer referrals. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
This programme always presents challenges with owner liaison and reaching agreements to install door entry where none exists,
this contributes directly to achieving SHQS compliance for this element and reducing abeyances. The budget reflects the demand
and number of installs required but it is acknowledged that full uptake is unlikely.
Page 172

Page 29

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
15
Project Life Financials 280 0 0% 280 0 0%
Current Year Financials 54 0 0% 54 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
16
Project Life Financials 5,293 73 1% 5,293 0 0%
Current Year Financials 1,036 73 7% 1,036 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
17
Project Life Financials 103 0 0% 103 0 0%
Current Year Financials 103 0 0% 103 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
Improvement works (Risk St)
Risk Street Over clad 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Modern facilities and services
New Kitchens, Bathrooms and Showers
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught
exclusion) 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Page 173

Page 30

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
18
Project Life Financials 581 0 0% 400 (181) -31%
Current Year Financials 181 0 0% 0 (181) -100%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
19
Project Life Financials 3,637 35 1% 3,637 0 0%
Current Year Financials 887 35 4% 887 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
20
Project Life Financials 5,092 295 6% 5,092 0 0%
Current Year Financials 969 295 30% 969 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
21
Project Life Financials 1,135 9 1% 1,135 0 0%
Current Year Financials 215 9 4% 215 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Asbestos management works
This budget is to fund work associated with the management of current asbestos legislation and
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Spend as required
Defective structures/component renewals
Defective structures 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, contingent budget for unplanned spend
Mitigating Action
none at this time
Contingencies
This is a contingent budget for unforeseen matters which may arise during the year.
Page 174

Page 31

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
22
Project Life Financials 2,378 0 0% 2,378 0 0%
Current Year Financials 800 0 0% 800 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
23
Project Life Financials 7,729 172 2% 7,729 0 0%
Current Year Financials 2,019 172 9% 2,019 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
None required.
Anticipated Outcome
Budget spend anticipated, should criteria be met.
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme, back
into council use.  These properties must assist the council with reducing housing need on the waiting list and where appropriate
assist with external capital works.  For these reasons, any purchase is subject to stringent criteria to ensure accountability and
value for money for existing tenants.  Spend in 22/23 will therefore be dependent on these factors.  So far this year , 2 homes
have been purchased, with 3 under offer and  the targeted is to deliver an additional 20 homes each year through the buyback
scheme
Main Issues / Reason for Variance
No Issues, anticipated to meet spend and revised targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Multi Story Flats  ( including Fire Risk Assessment Works)
High Rise Fire Safety Measures 
Planned End Date  Forecast End Date
Page 175

Page 32

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
24
Project Life Financials 13,031 835 6% 13,031 0 0%
Current Year Financials 2,504 835 33% 2,504 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL OF GREEN
PROJECTS
Project Life Financials 100,816 3,577 4% 100,636 (181) 0%
Current Year Financials 23,922 3,587 15% 23,742 (181) -1%
Main Issues / Reason for Variance
No Issues, budget for salaries and support
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Salaries/central support/offices
Allocation of costs from other WDC services who support the HRA capital programme 
Planned End Date  Forecast End Date
Page 176

Page 33

APPENDIX 6
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (48,826) 0 0% (48,826) 0 0%
Current Year Financials (30,006) 0 0% (30,006) 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL RESOURCES
Project Life Financials 48,826 0 0% 48,826 0 0%
Current Year Financials 30,006 0 0% 30,006 0 0%
Main Issues / Reason for Variance
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
NEW BUILD GRANT
Grant to facilitate the building of new build housing 
Planned End Date  Forecast End Date
No issues, income due to be received with no problems anticipated
Mitigating Action
None required
Anticipated Outcome
Income due to be received
Page 177

Page 34

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
HRA CAPITAL PROGRAMME
ANALYSIS OF AFFORDABLE HOUSING SUPPLY PROGRAMME
MONTH END DATE
PERIOD 4
Budget Spend to Date Forecast Spend
£000 £000 £000 £000 %
RAG
Status
St Andrews School 636                        34                           636                              -                         0% 
Haldane Primary School 148                        0                             148                              -                         0% 
Aitkenbar Primary School 652                        -                         652                              -                         0% 
Clydebank East 26,474                   -                         26,474                         -                         0% 
Creveul Court 58                           59                           58                                 -                         0% 
Queens Quay Site B 1,259                     858                        1,259                           -                         0% 
Queens Quay Site C 6,198                     1                             6,198                           -                         0% 
Pappert 7,332                     2                             7,332                           -                         0% 
Lilac Avenue 2,676                     -                         2,676                           -                         0% 
Bank Street 4,674                     -                         4,674                           -                         0% 
Clydebank Health Centre 6,930                     3                             6,930                           -                         0% 
Willox Park Phase1 3,817                     34                           3,817                           -                         0% 
Willox Park Phase2 6,300                     -                         6,300                           -                         0% 
Mount Pleasant 4,200                     11                           4,200                           -                         0% 
Silverton 2,100                     -                         2,100                           -                         0% 
Fees, Staffing Costs, contingency 4,005                     14                           4,005                           -                         0% 
Gap sites 12,600                   -                         12,600                         -                         0% 
Bonhill Gap Site -                         2                             -                               -                         0% 
Future New build sites 16,824                   -                         16,824                         -                         0% 
Total Expenditure 106,883 1,019 106,883 0 
31 July 2022
Site
Project Life Financials
Variance
Page 178

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources
Housing and Communities Committee: 24 August 2022
___________________________________________________________________
Subject:  Financial Report 2022/23 as at Period 4 (31 July 2022)
1. Purpose
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 31 July 2022 (Period 4) of those services under the
auspices of the Housing and Communities Committee.
2. Recommendations
2.1 Members are asked to:
i) note the contents of this report which shows the revenue budget forecast
to underspend against budget by £0.089m (2.17%) at the year-end.
ii) note the net projected annual position in relation to relevant capital
projects which is showing no projected variance; and
iii) note the progress on efficiencies incorporated into budgets for 2022/23.
3. Background
3.1      Revenue Budget
At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23.
A total net budget of £3.691m was approved for services under the remit for
Housing and Communities services at that time. Adjustments have been
made since that date and the revised budget now under the remit of Housing
and Communities is £4.075m as per below.
Description £m
Starting Position 3.691
Cost of Living budget allocation 0.302
Homeless Prevention 0.082
Revised budget 4.075
Capital
3.2 At the meeting of Council on 9 March 2022, Members also agreed the
updated 10 year General Services Capital Plan for 2022/2023 to 2031/32. 
The next three years from 2022/23 to 2024/25 have been approved in detail
ITEM 14
Page 179

Page 36

with the remaining 7 years being indicative at this stage. The total project life
budget approved for projects that have either commenced or are due to
commence in that period total for Housing and Communities services was
£1.212m.
4. Main Issues
Revenue Budget
4.2 Appendix 1 shows the probable outturn for the services at £3.986m. As the
revised annual budget is £4.075m there is a projected favourable variance
currently projected of £0.089m. A more detailed analysis by service is given in
Appendix 2. Comments are shown in Appendix 3 when there are projected net
annual variances greater than £0.050m and also where the net variance is
below £0.050m but there are offsetting variances of over £0.050m within the
service. Appendix 4 shows progress on the achievement of saving options
adopted as part of the 2022/23 budget.
Capital Budget
4.3 The overall programme summary report is shown in Appendix 5. The analysis
shows that for the in-year planned spend there is currently no projected
variance.
5. People Implications
5.1 There are no people implications.
6. Financial Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report.
6.2  Agreed management adjustments for 2022/23 are monitored with
current indications being that the saving of £0.021m will be achieved (see
Appendix 4).
7. Risk Analysis
7.1 The present variances should be viewed in the knowledge that there are a
number of variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets – particularly in light of COVID-19.
7.2 Assumptions around service demand and timing of nationally agreed changes
through the phasing out of lockdown change regularly and therefore there is a
significant risk that the projected year end budgetary position will change from
that reported.
Page 180

Page 37

8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Finance and Legal services have been requested on this
report and both have advised there are neither any issues nor concerns with
the proposal. As the report is for noting no further consultation is envisaged.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer, Resources
Date: 11 August 2022
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner, 16
Church Street, Dumbarton, G82 1QL, telephone: 01389
737707, e-mail janice.rainey@west-dunbarton.gov.uk
Appendices: Appendix 1 - Summary Budgetary Position (Revenue)
Appendix 2 - Detailed Budgetary Position (Revenue)
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Savings Options (Revenue)
Appendix 5 - Budgetary Position (Capital)
Appendix 6 - Variance Analysis Green (Capital)
Background Papers: None
Wards Affected: All
Page 181

Page 38

Page 182

Page 39

WEST DUNBARTONSHIRE COUNCIL Appendix 1
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 31 July 2022
Actual
Outturn
2021/22
Total Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
Annual
RAG
Status
£000 £000 £000 £000 £000 %
2,721 3,327 938 3,328 1 0% 
876 1,051 266 1,019 (32) -3% 
500 436 437 440 4 1% 
41 32 0 35 3 9% 
65 Private Sector Housing Grant 79 (58) 80 1 1% 
434 469 110 468 (1) 0% 
0 Housing Asset and Investment 81 11 31 (50) -62% 
(567) (1,401) (483) (1,414) (13) -1% 
4,071 4,075 1,222 3,986 (89) -2.17% 
Service / Subjective Summary Annual Variance 2022/23
Communities
Homeless Persons
Private Sector Housing
Anti Social Behaviour
Housing Maintenance Trading A/c
Total Net Expenditure
Working 4 U
Page 183

Page 40

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 July 2022
PERIOD 4
Actual Outturn
2021/22 Service Summary
Total
Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
RAG Status
£000 £000 £000 £000 £000 %
17,621 Employee 19,449 6,150 19,583 134 1% 
2,984 Property 2,089 609 2,081 (9) 0% 
1,324 Transport and Plant 1,192 394 1,183 (9) -1% 
11,049 Supplies, Services and Admin 4,430 2,205 4,675 244 6% 
3,796 Payments to Other Bodies 5,388 918 5,386 (2) 0% 
(3) Other 0 0 0 0 0% 
36,772 Gross Expenditure 32,548 10,277 32,908 358 1% 
(32,701) Income (28,474) (9,055) (28,922) (448) -2% 
4,071 Net Expenditure 4,075 1,222 3,986 (89) -2% 
£000 £000  £000  £000  £000 %
2,496 Employee 2,911 950 2,926 15 1% 
0 Property 2 0 0 (2) -100% 
4 Transport and Plant 23 3 10 (13) -56% 
102 Supplies, Services and Admin 194 79 194 0 0% 
1,494 Payments to Other Bodies               2,888 218 2,888 0 0% 
0 Other 0 0 0 0 0% 
4,096 Gross Expenditure 6,017         1,250         6,017         0 0% 
(1,375) Income (2,689) (311) (2,689) 0 0% 
2,721               Net Expenditure 3,327         938            3,328         0 0% 
£000 £000  £000  £000  £000 %
618 Employee 980 218 946 (34) -3% 
282 Property 115 17 115 0 0% 
4 Transport and Plant 4 1 4 (1) -23% 
7 Supplies, Services and Admin 4 7 10 6 154% 
173 Payments to Other Bodies 146 53 146 0 0% 
0 Other 0 0 0 0 0% 
1,084 Gross Expenditure 1,249         295            1,221 (28) -2% 
(208) Income (198) (29) (202) (4) -2% 
876                  Net Expenditure 1,051         266            1,019 (32) -3% 
Annual Variance
2022/23
All Services
Working 4 U
Communities
Page 184

Page 41

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 July 2022
PERIOD 4
Actual Outturn
2021/22 Service Summary
Total
Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
RAG Status Annual Variance
2022/23
£000 £000 £000 £000 £000 %
2,121 Employee 2,585 840 2,616 31 1% 
2,397 Property 1,649 564 1,643 (7) 0% 
24 Transport and Plant 31 12 34 4 13% 
236 Supplies, Services and Admin 97 44 96 (1) -1% 
789 Payments to Other Bodies 950 249 959 8 1% 
0 Other 0 0 0 0 0% 
5,567 Gross Expenditure 5,312 1,709 5,347 35 1% 
(5,067) Income (4,876) (1,272) (4,908) (31) -1% 
500                  Net Expenditure 436 437 440 4 1% 
£000 £000 £000 £000 £000 %
0 Employee 0 0 0 0 0% 
0 Property 0 0 0 0 0% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 0 0 0 0 0% 
41 Payments to Other Bodies 32 0 35 3 9% 
0 Other 0 0 0 0 0% 
41 Gross Expenditure 32 0 35 3 9% 
0 Income 0 0 0 0 0% 
41                    Net Expenditure 32 0 35 3 9% 
£000 £000 £000 £000 £000 %
39 Employee 39 13 40 1 3% 
223 Property 241 0 241 0 0% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 0 (0) 0 0 0% 
249 Payments to Other Bodies 246 78 245 (1) 0% 
0 Other 0 0 0 0 0% 
511 Gross Expenditure 525 91 526 1 0% 
(446) Income (446) (149) (446) 0 0% 
65                    Net Expenditure 79 (58) 80 1 1% 
Private Sector Housing
Private Sector Housing Grant
Homeless Persons
Page 185

Page 42

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2022/2023
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 July 2022
PERIOD 4
Actual Outturn
2021/22 Service Summary
Total
Budget
2022/23
YTD Spend
2022/23
Forecast
Spend
2022/23
RAG Status Annual Variance
2022/23
£000 £000 £000 £000 £000 %
280 Employee 351 108 360 9 3% 
0 Property 0 0 0 0 0% 
2 Transport and Plant 1 1 3 3 399% 
4 Supplies, Services and Admin 11 1 11 0 0% 
149 Payments to Other Bodies 162 0 150 (12) -7% 
0 Other 0 0 0 0 0% 
434 Gross Expenditure 525 110 524 (0) 0% 
0 Income (55) (0) (57) (1) -2% 
434                  Net Expenditure 469 110 468 (1) 0% 
………………………………………………………………………………………………………………………………………………………………………………………….
£000 £000 £000 £000 £000 %
336 Employee 488 119 369 (119) -24% 
0 Property 0 0 0 0 0% 
3 Transport and Plant 5 1 3 (2) -40% 
1 Supplies, Services and Admin 0 0 0 0 0% 
0 Payments to Other Bodies 0 0 0 0 0% 
0 Other 0 0 0 0 0% 
340 Gross Expenditure 493 120 372 (121) -25% 
(340) Income (412) (109) (341) 71 17% 
-                   Net Expenditure 81 11 31 (50) -62% 
£000 £000 £000 £000 £000 %
11,732 Employee 12,096 3,903 12,327 231 2% 
82 Property 82 28 82 0 0% 
1,287 Transport and Plant 1,128 376 1,128 0 0% 
10,699 Supplies, Services and Admin 4,125 2,074 4,364 239 6% 
901 Payments to Other Bodies 964 321 964 0 0% 
(3) Other 0 0 0 0 0% 
24,698 Gross Expenditure 18,395 6,702 18,865 470 3% 
(25,265) Income (19,796) (7,185) (20,279) (483) -2% 
(567) Net Expenditure (1,401) (483) (1,414) (13) 1% 
Housing Maintenance Trading A/c
Anti Social Behaviour
Housing  Asset and Investment
Page 186

Page 43

WEST DUNBARTONSHIRE COUNCIL Appendix 3
REVENUE BUDGETARY CONTROL 2022/2023
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Housing Asset and Investment 81 31 (50) -62% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Maintenance Trading A/c (1,401) (1,414) (13) 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service delivers maintenance and investment services to the council's housing stock.
Slight overecovery against surplus target
None Required
Forecast higher payroll costs and higher subcontractor expenditure is matched by forecast
higher income
Budget Details
Variance Analysis
Variance
31 July 2022
This service manages capital investment across council and private sector housing stock.
Employee costs are showing a favourable variance due to vacant posts within the service.
Employee cost underspend is partially offset by a reduction in the level of income being
recharged to the Housing Revenue Account.
None Required
Underspend forecast at year end
Page 187

Page 44

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2022/23 Appendix 4
Efficiency
reference
Efficiency Detail Budgeted
Amount £
Projection of
Total Saved £
Projection of
Total Not Saved
£
Comment
MA55 Review Rental Structure for
Ashton View Supported
Accommodation Project based
on current service provision
Housing &
Employability
21,000                -                      
-                  21,000                -                      
Page 188

Page 45

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD
Spend to
Date
Spend to
Date
£000 £000
Red
0 0% 0 0% 0 0% 0 0%
Amber
0 0% 0 0% 0 0% 0 0%
Green
3 100% 872 100% 3 100% 17 100%
3 100% 872 100% 3 100% 17 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Forecast
Variance Slippage Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
PL CY
0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
1,212 872 1,212 (0) 147 17 147 0 0 (0) 0% 0%
1,212 872 1,212 (0) 147 17 147 0 0 (0)
31 July 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
TOTAL EXPENDITURE
04
Projects are forecast to be overspent and/or significant delay to completion
Amber
Red
Projects are forecast to be overspent and/or experience material delay to completion
Amber
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
Page 189

Page 46

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 912 849 93% 912 0 0%
Current Year Financials 80 17 21% 80 0 0%
Project Description
Project Manager Elaine Troup
Chief Officer Peter Barry
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 100 23 23% 100 (0) 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Manager Graham Watters
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
3
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager John Kerr
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Development of system progressing, with full budget spend anticipated to be incurred in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Full spend is anticipated on this year's budget.
Integrated Housing Management System
Development of IHMS system.
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated
service delivery in response to community need. This is complimented by community capacity building,
empowering WD citizens to do more for their own communities (leading to less reliance on council).  Also
included is the implementation of participatory budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application process is planned for later in this financial year.
Main Issues / Reason for Variance
Project was initially stalled due to COVID-19 restrictions, however as these are easing Officers have now carried out a consultative exercise and
initiated a site inspection to develop the work programme for 2022/23.
Mitigating Action
Officers carried out some proactive consultative work to establish the tenant priorities this will allow the work programme to be developed
timeously.
Anticipated Outcome
It is expected the works programme  will be completed during 2022/23.
Anticipated Outcome
Development of IHMS system.
Dennystoun Forge Site Improvements
Dennystoun Forge Site Improvements
Planned End Date Forecast End Date
Page 190

Page 47

West Dunbartonshire Performance Report
Q4 - 1st January 2022 - 31st March 2022
Annick
ITEM 15b
Page 191

Page 48

West Dunbartonshire Performance Report
Table of Contents
Local Fire and Rescue Service Plan Priorities 3
WestDunbartonshire Activity Summary   4
Domestic Safety - Accidental Dwelling Fires 5
Domestic Safety - Accidental Dwelling Fire Casualties 6
Unintentional Injury and Harm                                                                                             7
Deliberate Fire Setting                                                                                                      8
Non-Domestic Fire Safety                                                                 9
Unwanted Fire Alarm Signals                                                      10
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                2Page 192

Page 49

4 0 0 11 0 8
4 0 0 3 0 30
6 0 4 12 1 12
2 0 0 14 0 4
3 0 0 27 1 15
5 0 1 5 4 14
24 0 5 72 6 83
-20% -100% 0% -6% 200% -25%
-17% -15% -30% 6% 5% -3%
18% 0% 12% 30% 18% 22%
Accidental
Dwelling
Fires
Accidental
Dwelling Fire
Casualties
Non-
Domestic   
Fire Safety
Unwanted
Fire Alarm
Signals
Unintentional
Injury and Harm
Deliberate
Fire Setting
Local Fire and Rescue Service Plan Priorities
Year on Year Change
3 Year Average Change
5 Year Average Change
Clydebank Central
Clydebank Waterfront
Dumbarton
Kilpatrick
Leven
Lomond
Total Incidents
The Local Fire and Rescue Service Plan has been developed to set out the priorities and objectives within West
Dunbartonshire and allows our local authority partners to scrutinise the performance outcomes of these priorities.             
We will continue to work closely with our partners in West Dunbartonshire to ensure we are all “Working Together for a
Safer Scotland” through targeting risks to our communities at a local level.
The plan has been developed to complement key partnership activity embedded across West Dunbartonshire`sCommunity
Plan and associated Delivery and Thematic plans. Through partnership working we will seek to deliver continuous
improvement in our performance and effective service delivery in our area of operations.
The Local Fire and Rescue Plan for West Dunbartonshireidentified six areas for demand reduction and is subject to regular
monitoring and reporting through the Police & Fire and Rescue Committee. A summary of the priorities and current activity
is detailed below with further detail and analysis contained within this performance report.
About the statistics within this report 
The activity totals and other statistics quoted within this report are published in the interests of transparency and
openness. They are provisional in nature and subject to change as a result of ongoing quality assurance and review.
Because all statistics quoted are provisional there may be a difference in the period totals quoted in our reports after
local publication which result from revisions or additions to the data in our systems. The Scottish Government publishes
official statistics each year which allow for comparisons to be made over longer periods of time.
Activity levels have reduced by more than 5%
Activity levels have reduced by up to 5%
Activity levels have increased overall
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                3Page 193

Page 50

West Dunbartonshire Activity Summary
2017/18 2018/19 2019/20 2020/21 2021/22
104 111 105 118 120
51 50 68 49 62
156 144 129 156 149
311 305 302 323 331Total Incidents
All Special Services
All False Alarms
All Fires
0
50
100
150
200
250
300
350
2017/18 2018/19 2019/20 2020/21 2021/22
Total Incidents All Fires All Special Services All False Alarms
35%
18%
47%
36%
19%
45%
All Fires All Special Services All False Alarms
Incidents by Classification
Annual Average
5 Year Average
25.08%
14.80%
10.27%
9.67%
7.55%
7.55%
7.25%
2.42%
2.42%
1.81%
1.51%
1.51%
1.21%
0.91%
0.91%
False Alarm (UFAS)
Outdoor Fire
False Alarm (Good Intent)
Refuse Fire
Dwelling Fire
False Alarm (Dwelling)
SS - Effecting entry/exit
SS - Assist other agencies
Special Service - Flooding
Other Building Fire
SS - RTC
Vehicle Fire
False Alarm (Malicious)
SS - Other rescue/release
False Alarm (Equipment)
Top 15 Incident Types by % of Total Incidents
West Dunbartonshire OperationalTrends
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
120
fires
primary &
secondary
special
services62
false
alarms
149
-4%
totalnumber of
incidents
331 2%
2%
fire & non-fire
casualties
6 -63%
economiccost of
ufas incidents
£163,510
Activityby Time of Day
27%
(2) (13) (-7)
(8) (-10)
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                4Page 194

Page 51

-20% -17% 18%
Year on
Year
3 Year
Average
5 Year
Average
Main Source of Ignition
Domestic Safety - Accidental Dwelling Fires Domesti
Detection Present
79.2% 94.7%
Detection Actuated
Calls Made via Linked Alarms
79.2%
18
2 2 2
Cooking appliance Electricity supply Smoking Related Other domestic
style appliance
35
41
31 30
24
2017/18 2018/19 2019/20 2020/21 2021/22
70.8% 8.3%
45.8% 75.0%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage Only Nofire Damage
Alcohol/Drug Impairment
0.0%
Distraction
20.8%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
16.7%
Clydebank
Waterfront
16.7% 25.0%
Dumbarton
Kilpatrick Leven Lomond
8.3% 12.5% 20.8%
Clydebank
Central
Performance Summary
AccidentalDwelling Fires to Date
Main Source of Ignition
Accidental Dwelling Fires by Time of Day
Severity of Accidental Dwelling Fires
Human Factors
Automatic Detection & Actuation
AccidentalDwelling Fires Activity by Ward (% share)
(4) (4) (6)
(2) (3) (5)
(17) (2)
(11) (18)
(5) (0)
(19) (18)
(19)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                5Page 195

Page 52

-100% -15% 0%
Year on
Year
3 Year
Average
5 Year
Average
Domestic Safety - Accidental Dwelling Fire Casualties
#DIV/0!
#DIV/0
#DIV/0
#DIV/0
#DIV/0
0 0 0 0 00 0 0 0 0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
#DIV/
Female
#DIV/0!
1
2
3
8
0
2017/18 2018/19 2019/20 2020/21 2021/22
Clydebank
Central
0.0%
Clydebank
Waterfront
0.0% 0.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 0.0% 0.0%
Unintentional Injury or
01 02 03
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
First Aid at Scene
Hospital -Serious Injuries
Hospital-Slight Injuries
Fatality
Performance Summary Fire Casualties by Time of Day
AccidentalDwelling Fire Casualties Year to Date
Nature of Injury
Extent of Harm
Age / Gender Profile
Accidental Dwelling Fire Casualties by Ward (% share)
(0) (0) (0)
(0) (0) (0)
(0) (0)
(0) (0)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                6Page 196

Page 53

0% -30% 12%
5 Year
Average
Year on
Year
3 Year
Average
Unintentional Injury or Harm
Other physical
injury
Not known
Chest /
Abdominal injury 40.0%
40.0%
20.0%
0.0%
0.0%
0.0%
0 0
1 1
00 0
2
1
0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
40%
Female
60%
Clydebank
Central
Clydebank
Waterfront
0.0% 80.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 0.0% 20.0%
0.0%
Road Traffic Collision Water Rescue
Assisting Other Agencies
40.0% 0.0%
60.0%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00
First Aid at Scene
Hospital -Serious Injuries
Hospital -Slight Injuries
20.0%
0.0% 0.0%
Fatality
80.0%
20
12
6 5 5
2017/18 2018/19 2019/20 2020/21 2021/22
Deliberate
Performance Summary
Non-Fire Casualties Year to Date
Non-Fire Casualties by Time of Day
Nature of Injury
Extent of Harm
Non-FireEmergency Activity
Age / Gender Profile
Non-FireCasualties by Ward (% share)
(0) (0) (4)
(0) (0) (1)
(0)(2)
(4) (0)
(1) (0)
(3)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                7Page 197

Page 54

-6% 6% 30%
Year on
Year
3 Year
Average
5 Year
Average
Deliberate Fire Setting
Clydebank
Central
Clydebank
Waterfront
4.2% 16.7%
Dumbarton
Kilpatrick Leven Lomond
19.4% 37.5% 6.9%
15.3%
45
60 55
77 72
2017/18 2018/19 2019/20 2020/21 2021/22
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
0.0%
42.2%
20.0%
18.2%
15.6%
5.6%
0.0%
57.8%
80.0%
81.8%
84.4%
94.4%
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
Primary Secondary
1
0
2
1
Other Buildings
Dwellings
Vehicles
Other Primary
28
40
Refuse
Other Secondary
311 305 302
323
331
26 48 45 65 68
0
200
400
600
280
300
320
340
2017/18 2018/19 2019/20 2020/21 2021/22
All Incidents Deliberate Secondary Fires
Non
Performance Summary
Deliberate Fires Year to Date
Deliberate Firesby Time of Day
Deliberate Firesby Classification
Primary Fire Ratio by Activity Type
Secondary Fire Ratio by Activity Type
Deliberate Fires Compared to Operational Activity
Deliberate Fires by Ward (% share)
(11) (3) (12)
(14) (27) (5)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                8Page 198

Page 55

200% 5% 18%
Year on
Year
3 Year
Average
5 Year
Average
Non Domestic Fire Safety
15
5
12
2
6
2017/18 2018/19 2019/20 2020/21 2021/22
Clydebank
Central
Clydebank
Waterfront
0.0% 16.7%
Dumbarton
Kilpatrick Leven Lomond
0.0% 16.7% 66.7%
0.0%
83%
17%
Accidental Deliberate Not Known
50.0% 50.0%
33.3% 66.7%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage No FireDamage
2
1
1
1
1
Education, Infant/primary
school
Retail, Other retail
Other Residential, Sheltered
Housing - not self contained
Non Residential, Private
Garden ShedPermanent Agricultural,
Intensive Farming Sheds
(chickens, pigs etc)
Unwanted
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00Performance Summary
Non-Domestic Fires Year to Date
Non-Domestic Firesby Time of Day
Non-Domestic Fires by Nature of Origin
Non-Domestic Fires by Ward (% share)
Severity of Non-DomesticFires
Non-Domestic Fires by Premises Type
(0) (0) (1)
(0) (1) (4)
(3) (3)
(2) (4)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                9Page 199

Page 56

-25% -3% 22%
5 Year
Average
Year on
Year
3 Year
Average
Unwanted Fire Alarm Signals
108
92
73
111
83
2017/18 2018/19 2019/20 2020/21 2021/22
Clydebank Clydebank
Waterfront
36.1% 14.5%
Dumbarton
Kilpatrick Leven Lomond
4.8% 18.1% 16.9%
9.6%
14
13
12
11
8
Retail
Education
Hospital/Medical
Care Home Residential
Warehouse/Storage
25%
UFAS Percentage Against all Incidents
UFAS Percentage Against all False Alarms
56%
Human Influenceand Alarm Activations
33.7%
0.0
1.0
2.0
Mon Tue Wed Thu Fri Sat Sun
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
Performance Summary
Unwanted Fire Alarm Signals Year to Date
Unwanted Fire AlarmSignals by Ward (% share)
Unwanted Fire Alarm Signals by Time of Day
Unwanted Fire Alarm Signals- Top 5 Premises
Unwanted Fire Alarm Signals Activity Ratios
Average UnwantedFire Alarm Signals per Day
(83)
(28)
(8) (30) (12)
(4) (15) (14)
(83)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                10Page 200

Page 57

West Dunbartonshire Performance Report
Q1 - 1st April 2022 - 30th June 2022
Annick
Page 201

Page 58

West Dunbartonshire Performance Report
Table of Contents
Local Fire and Rescue Service Plan Priorities 3
WestDunbartonshire Activity Summary   4
Domestic Safety - Accidental Dwelling Fires 5
Domestic Safety - Accidental Dwelling Fire Casualties 6
Unintentional Injury and Harm                                                                                             7
Deliberate Fire Setting                                                                                                      8
Non-Domestic Fire Safety                                                                 9
Unwanted Fire Alarm Signals                                                      10
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                2Page 202

Page 59

2 0 0 21 1 20
11 0 1 26 6 47
5 3 5 35 1 14
3 0 0 21 0 5
4 0 0 43 4 17
0 0 4 21 1 16
25 3 10 167 13 119
39% 50% 11% -26% 30% 16%
3% -20% -37% 5% 14% 8%
27% 33% 17% 27% 34% 34%
Year on Year Change
3 Year Average Change
5 Year Average Change
Clydebank Central
Clydebank Waterfront
Dumbarton
Kilpatrick
Leven
Lomond
Total Incidents
Local Fire and Rescue Service Plan Priorities
Accidental
Dwelling
Fires
Accidental
Dwelling Fire
Casualties
Non-
Domestic   
Fire Safety
Unwanted
Fire Alarm
Signals
Unintentional
Injury and Harm
Deliberate
Fire Setting
The Local Fire and Rescue Service Plan has been developed to set out the priorities and objectives within West
Dunbartonshire and allows our local authority partners to scrutinise the performance outcomes of these priorities.             
We will continue to work closely with our partners in West Dunbartonshire to ensure we are all “Working Together for a
Safer Scotland” through targeting risks to our communities at a local level.
The plan has been developed to complement key partnership activity embedded across West Dunbartonshire`sCommunity
Plan and associated Delivery and Thematic plans. Through partnership working we will seek to deliver continuous
improvement in our performance and effective service delivery in our area of operations.
The Local Fire and Rescue Plan for West Dunbartonshireidentified six areas for demand reduction and is subject to regular
monitoring and reporting through the Police & Fire and Rescue Committee. A summary of the priorities and current activity
is detailed below with further detail and analysis contained within this performance report.
About the statistics within this report 
The activity totals and other statistics quoted within this report are published in the interests of transparency and
openness. They are provisional in nature and subject to change as a result of ongoing quality assurance and review.
Because all statistics quoted are provisional there may be a difference in the period totals quoted in our reports after
local publication which result from revisions or additions to the data in our systems. The Scottish Government publishes
official statistics each year which allow for comparisons to be made over longer periods of time.
Activity levels have reduced by more than 5%
Activity levels have reduced by up to 5%
Activity levels have increased overall
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                3Page 203

Page 60

West Dunbartonshire Activity Summary
2018/19 2019/20 2020/21 2021/22 2022/23
142 175 210 274 215
40 61 60 63 60
172 170 128 187 193
354 406 398 524 468Total Incidents
All Special Services
All False Alarms
All Fires
0
100
200
300
400
500
600
2018/19 2019/20 2020/21 2021/22 2022/23
Total Incidents All Fires All Special Services All False Alarms
48%
13%
39% 46%
13%
41%
All Fires All Special Services All False Alarms
Incidents by Classification
Annual Average
5 Year Average
25.43%
21.37%
11.32%
10.04%
5.77%
4.49%
4.27%
2.78%
2.56%
2.14%
2.14%
1.50%
0.85%
0.85%
0.64%
False Alarm (UFAS)
Outdoor Fire
Refuse Fire
False Alarm (Good Intent)
Dwelling Fire
False Alarm (Dwelling)
SS - Effecting entry/exit
Other Building Fire
Vehicle Fire
SS - No action (not false alarm)
Other Primary Fire
Special Service - Flooding
False Alarm (Equipment)
SS - RTC
SS - Assist other agencies
Top 15 Incident Types by % of Total Incidents
West Dunbartonshire OperationalTrends
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
215
fires
primary &
secondary
special
services60
false
alarms
193
3%
totalnumber of
incidents
468 -11%
-22%
fire & non-fire
casualties
14 27% economiccost of
ufas incidents
£234,430
Activityby Time of Day
-5%
(-59) (-3) (6)
(-56) (3)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                4Page 204

Page 61

39% 3% 27%
Main Source of Ignition
Year on
Year
3 Year
Average
5 Year
Average
Domestic Safety - Accidental Dwelling Fires Domesti
Detection Present
96.0% 75.0%
Detection Actuated
Calls Made via Linked Alarms
88.0%
18
3 2 1 1
Cooking appliance Electricity supply Smoking Related Other domestic
style appliance
Matches and
candles
28
23
25
18
25
2018/19 2019/20 2020/21 2021/22 2022/23
60.0% 12.0%
52.0% 72.0%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage Only Nofire Damage
Alcohol/Drug Impairment
12.0%
Distraction
48.0%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
8.0%
Clydebank
Waterfront
44.0% 20.0%
Dumbarton
Kilpatrick Leven Lomond
12.0% 16.0% 0.0%
Clydebank
Central
Performance Summary
AccidentalDwelling Fires to Date
Main Source of Ignition
Accidental Dwelling Fires by Time of Day
Severity of Accidental Dwelling Fires
Human Factors
Automatic Detection & Actuation
AccidentalDwelling Fires Activity by Ward (% share)
(2) (11) (5)
(3) (4) (0)
(15) (3)
(13) (18)
(12) (3)
(24) (18)
(22)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                5Page 205

Page 62

50% -20% 33%
Year on
Year
3 Year
Average
5 Year
Average
Domestic Safety - Accidental Dwelling Fire Casualties
Overcome by
gas, smoke or
toxic fumes; 100.0%
0.0%
0.0%
0.0%
0.0%
0 0 0
1
00 0
2
0 0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
33%
Female
67%
1
3
1
2
3
2018/19 2019/20 2020/21 2021/22 2022/23
Clydebank
Central
0.0%
Clydebank
Waterfront
0.0% 100.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 0.0% 0.0%
Unintentional Injury or
01 02 03
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
First Aid at Scene
Hospital -Serious Injuries
Hospital-Slight Injuries
Fatality
Performance Summary Fire Casualties by Time of Day
AccidentalDwelling Fire Casualties Year to Date
Nature of Injury
Extent of Harm
Age / Gender Profile
Accidental Dwelling Fire Casualties by Ward (% share)
(0) (0) (3)
(0) (0) (0)
(2) (0)
(1) (0)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                6Page 206

Page 63

11% -37% 17%
Year on
Year
3 Year
Average
5 Year
Average
Unintentional Injury or Harm
Other
Head injury
Fracture
Back / Neck
Cuts/Lacerati
ons
Chest /
Abdominal injury 30.0%
20.0%
20.0%
10.0%
10.0%
10.0%
0
1
5
2
00 0
2
0 0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
80%
Female
20%
Clydebank
Central
Clydebank
Waterfront
10.0% 50.0%
Dumbarton
Kilpatrick Leven Lomond
0.0% 0.0% 40.0%
0.0%
Road Traffic Collision Water Rescue
Assisting Other Agencies
90.0% 0.0%
10.0%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00
First Aid at Scene
Hospital -Serious Injuries
Hospital -Slight Injuries
10.0%
30.0% 10.0%
Fatality
50.0%
13
27
10 9 10
2018/19 2019/20 2020/21 2021/22 2022/23
Deliberate
Performance Summary
Non-Fire Casualties Year to Date
Non-Fire Casualties by Time of Day
Nature of Injury
Extent of Harm
Non-FireEmergency Activity
Age / Gender Profile
Non-FireCasualties by Ward (% share)
(0) (1) (5)
(0) (0) (4)
(0)(9)
(3) (1)
(5) (1)
(1)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                7Page 207

Page 64

-26% 5% 27%
Year on
Year
3 Year
Average
5 Year
Average
Deliberate Fire Setting
Clydebank
Central
Clydebank
Waterfront
15.6% 21.0%
Dumbarton
Kilpatrick Leven Lomond
12.6% 25.7% 12.6%
12.6%
97
138
167
226
167
2018/19 2019/20 2020/21 2021/22 2022/23
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
0.0%
17.5%
12.3%
9.0%
6.6%
12.0%
0.0%
82.5%
87.7%
91.0%
93.4%
88.0%
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
Primary Secondary
2
5
5
8
Other Buildings
Dwellings
Vehicles
Other Primary
52
95
Refuse
Other Secondary
354 406 398
524 468
80 121 152 211 147
0
200
400
600
0
200
400
600
2018/19 2019/20 2020/21 2021/22 2022/23
All Incidents Deliberate Secondary Fires
Non
Performance Summary
Deliberate Fires Year to Date
Deliberate Firesby Time of Day
Deliberate Firesby Classification
Primary Fire Ratio by Activity Type
Secondary Fire Ratio by Activity Type
Deliberate Fires Compared to Operational Activity
Deliberate Fires by Ward (% share)
(21) (26) (35)
(21) (43) (21)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                8Page 208

Page 65

30% 14% 34%
Year on
Year
3 Year
Average
5 Year
Average
Non Domestic Fire Safety
10 9 9 10
13
2018/19 2019/20 2020/21 2021/22 2022/23
Clydebank
Central
Clydebank
Waterfront
46.2% 7.7%
Dumbarton
Kilpatrick Leven Lomond
0.0% 30.8% 7.7%
7.7%
54%38%
8%
Accidental Deliberate Not Known
53.8% 0.0%
30.8% 53.8%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage No FireDamage
2
2
2
2
2
1
1
1
Hospital/Medical
Non Residential, Private
Garden Shed
Other Residential, Sheltered
Housing - not self contained
Offices/Call Centres
Industrial/Warehouse
Religious, Church/Chapel
Residential Home,
Nursing/Care
Education, Infant/primary
school
Unwanted
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00Performance Summary
Non-Domestic Fires Year to Date
Non-Domestic Firesby Time of Day
Non-Domestic Fires by Nature of Origin
Non-Domestic Fires by Ward (% share)
Severity of Non-DomesticFires
Non-Domestic Fires by Premises Type
(1) (6) (1)
(0) (4) (1)
(7) (0)
(4) (7)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                9Page 209

Page 66

16% 8% 34%
Year on
Year
3 Year
Average
5 Year
Average
Unwanted Fire Alarm Signals
101 98
49
103
119
2018/19 2019/20 2020/21 2021/22 2022/23
Clydebank Clydebank
Waterfront
39.5% 11.8%
Dumbarton
Kilpatrick Leven Lomond
4.2% 14.3% 13.4%
16.8%
83
44
32
29
17
Residential Home,
Nursing/Care
Education, Infant/primary
school
Hospitals and medical care,
Hospital
Warehouses and bulk storage,
Warehouse
Education, Secondary school
25%
UFAS Percentage Against all Incidents
UFAS Percentage Against all False Alarms
62%
Human Influenceand Alarm Activations
32.8%
0.0
1.0
2.0
Mon Tue Wed Thu Fri Sat Sun
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
Performance Summary
Unwanted Fire Alarm Signals Year to Date
Unwanted Fire AlarmSignals by Ward (% share)
Unwanted Fire Alarm Signals by Time of Day
Unwanted Fire Alarm Signals- Top 5 Premises
Unwanted Fire Alarm Signals Activity Ratios
Average UnwantedFire Alarm Signals per Day
(119)
(39)
(20) (47) (14)
(5) (17) (16)
(119)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                10Page 210