Page 1

Agenda
Housing and Communities
Committee
Date:  Wednesday, 24 August 2022
___________________________________________________________________
Time:  10:00 
___________________________________________________________________
Format:  Hybrid meeting
___________________________________________________________________
Contact: Email: committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Housing and Communities Committee as detailed
above.
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Diane Docherty 
Councillor Ian Dickson 
Councillor Craig Edward (Chair)
Councillor Gurpreet Singh Johal 
Councillor David McBride
Councillor Jonathan McColl
Councillor Michelle McGinty
Councillor Jim McElhill
Councillor John Millar (Vice Chair)
Councillor Lawrence O’Neill
Councillor Martin Rooney
Councillor Sophie Traynor
All other Councillors for information
Chief Executive
Chief Officer - Housing and Employability
Chief Officer - Regulation and Regeneration
Chief Officer - Supply, Distribution and Property
Date issued: 11 August 2022
Audio Streaming
Please note: the sound from this meeting may be recorded for live and subsequent
audio streaming via the Council’s internet site.  At the start of the meeting, the Chair
will confirm if all or part of the meeting is being audio streamed.
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site.
If you have any queries regarding this and, in particular, if you believe that use and/or
storage of any particular information would cause, or be likely to cause, substantial
damage or distress to any individual, please contact the Chief Officer – Regulatory
and Regeneration on 01389 737800.
Page 2

Page 3

HOUSING AND COMMUNITIES COMMITTEE
WEDNESDAY, 24 AUGUST 2022
AGENDA
1 STATEMENT BY CHAIR – AUDIO STREAMING
The Chair will be heard in connection with the above.
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record.
5 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
6 HOUSING AND EMPLOYABILITY DELIVERY PLAN 2021/22 7 - 21 
YEAR END PROGRESS REPORT
Submit report by the Chief Officer, Housing and Employability presenting the
year-end progress report for the 2021/22 Delivery Plan as agreed by the
Committee on 5 May 2021. 
7 HOUSING ASSET & INVESTMENT DELIVERY PLAN 2021/22 23 - 33  
YEAR END PROGRESS 
Submit report by the Chief Officer, Supply, Distribution and Property providing
the year-end progress of the 2021/22 Delivery Plan. 
Page 3

Page 4

8 MORE HOMES WEST DUNBARTONSHIRE 35 - 46
- WEST DUNBARTONSHIRE COUNCIL AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME
Submit report by the Chief Officer, Housing and Employability providing an
update on progress with West Dunbartonshire’s More Homes Programme,
which oversees the delivery of the Council’s new home building programme.
9 SCOTTISH SOCIAL HOUSING CHARTER/REGULATION 47 - 59
OF SOCIAL HOUSING IN SCOTLAND ANNUAL UPDATE REPORT
Submit report by the Chief Officer, Housing and Employability providing West
Dunbartonshire Council’s annual progress report on meeting the requirements
of the Scottish Social Housing Charter. 
10 “HOME AT THE HEART 2019-24” WEST    61- 106
DUNBARTONSHIRE’S RAPID RE-HOUSING TRANSITION PLAN 
UPDATE AND NEW APPROACHES TO HOMELESSNESS PROGRESS
REPORT 
Submit report by the Chief Officer, Housing and Employability providing an
update on “Home at the Heart”, our Rapid Re-housing Transition Plan (RRTP)
for the period 2019-24 and new approaches to homelessness. 
11 “INVOLVING YOU”, WEST DUNBARTONSHIRE    107 - 142
COUNCIL’S TENANT PARTICIPATION STRATEGY 2021-24 – ANNUAL
PROGRESS REPORT
Submit report by the Chief Officer, Housing and Employability providing an
annual progress report on the implementation of “Involving You”, West
Dunbartonshire Council’s Tenant Participation Strategy which covers the
period 2021-24. 
12 UK SHARED PROSPERITY FUND    To Follow
Submit report by the Chief Officer, Housing and Employability highlighting the
launch of the UK Shared Prosperity Fund (UKSPF) and outlining a proposed
approach for West Dunbartonshire Council input into the Glasgow City Region
Investment Plan. 
13/
Page 4

Page 5

13 HOUSING REVENUE ACCOUNT BUDGETARY CONTROL
REPORT TO 31 JULY 2022 (PERIOD 4)   To Follow 
Submit report by the Chief Officer, Resources providing an update on the
financial performance to 31 July 2022 (Period 4) of the HRA revenue and
capital budgets for 2022/23
14 FINANCIAL REPORT 2022/23 AS AT PERIOD 4 (31 JULY 2022)
To Follow
Submit report by the Chief Officer, Resources providing an update on the
financial performance to 31 July 2022 (Period 4) of those services under the
auspices of Housing and Communities Committee.
15 SCRUTINY REPORTS
(A) POLICE SCRUTINY REPORT       143 – 144
Submit report by the Divisional Commander, Police Scotland providing
Members with an update.
(B) FIRE AND RESCUE SCRUTINY QUARTER 3    To Follow
REPORT     
Submit report by Local Senior Officer, Scottish Fire and Rescue Service
providing appropriate performance data measured against priorities in
the West Dunbartonshire Local Fire and Rescue Plan.___________________________________________________________________
Page 5

Page 6

Page 6

Page 7

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Peter Barry
Housing and Communities Committee: 24 August 2022
Subject: H&E Delivery Plan 2021/22 year end progress report
1 Purpose
1.1 The purpose of this report is to present to members the year-end progress
report for the 2021/22 Delivery Plan as agreed at Committee on 05 May 2021.
2 Recommendations
2.1 It is recommended that Committee:
• Notes progress made on the delivery of the 2021/22 plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework each Chief
Officer has developed an annual delivery plan for 2021/22. The plan sets out
actions to address key priority areas and issues identified through the service
planning process as well as actions to deliver the Council’s strategic
objectives. It also provides an overview of services and resources, including
employees and budgets, and considers relevant risks.
3.2 Progress is reported to Housing and Communities Services Committee twice
yearly, at mid-year and year-end.
4 Main Issues
4.1 The 2021/22 Delivery Plan was presented to Housing and Communities
Committee in May 2021 and mid-year progress reported on 03 November
2021. 
4.2 The Delivery Plan for 2021/22 was supported by an action plan of activities to
be delivered over the year. Appendix 1 details the progress on delivery of this
action plan. 
4.3 Of the 19 actions due by year-end, 16 have been completed as planned.
Incomplete actions relate to the following and all will be carried forward and
completed in 2022/23:
• Develop a revised ASB strategy - 25% complete;
• Develop a Housing Academy to provide training and development for housing
employees and tenant leaders - 60% complete; and
• Digital inclusion – carry out review of provision of wifi inclusion into new build
properties and priority areas of deprivation - 80% complete.
ITEM 6
Page 7

Page 8

4.4 Year-end values are available for all of the 16 performance indicators included
in the plan. Of those, five achieved their year-end targets, six were adrift of
target and five missed target. Three performance indicators showed
improvement in both the short and long term trend with a further six showing
improvement in the short term representing improvement upon the previous
year. Full details are set out in Appendix 1. 
Of the PIs that significantly missed target (red), all were significantly impacted
either by the pandemic or the cost of living crisis:
• % of residents aware of the community empowerment 2015 Act;
• The number of incidences of youth homelessness in West
Dunbartonshire is reduced;
• Average length of time to re-let properties;
• % of council rent that was lost due to houses remaining empty; and
• % of Households in Fuel Poverty.
4.5 11 of the 16 PIs either improved over the previous year or sustained the high
performance recorded in 2020/21. 
4.6 Each service area also developed a suite of quality standards, which set out
the level of service that users and stakeholders can expect to receive, and
remind both the organisation and employees of the challenges and obligations
they face in delivering best value services. Of the five PIs measuring quality
standards, two met or exceeded targets, two narrowly missed targets, and
one was superseded by further action around the service delivery. Where
data is available, performance against these standards is set out at Appendix
1.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this  
report. 
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Housing and Employability may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required. 
Page 8

Page 9

9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The Delivery Plans set out actions to support the successful delivery of the
strategic priorities of the Council.
Chief Officer: Peter Barry
Service Area: Housing & Employability
Date:  28 July 2022
________________________________________________________________
Person to Contact:  Nicola Docherty
nicola.docherty@west-dunbarton.gov.uk
Appendices: Appendix 1: H&E Delivery Plan 2021/22 - Year End
Progress
Background Papers: 2021/22 H&E Delivery Plan Report – Housing and
Communities Committee, 05 May 2021
2021/22 H&E Delivery Plan Mid-year Report – Housing
and Communities Committee, 03 November 2021
Wards Affected: All
Page 9

Page 10

H&E Delivery Plan 2021/22 Year end progress report
A strong local economy and improved job opportunities
Improve skills for life & learning
Performance Indicator
2020/21 2021/22
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
Employment rate 70.1% 70.6% 72.5%
The latest data released on 12th April 2022 shows the employment rate for 16-64
year olds in West Dunbartonshire increased from 70% for the period October 2020 to
September 2021 to 70.6% for the period from January to December 2021.  The
comparative rate for Scotland rose from 72.9% to 73.1% over the same period.
Stephen
Brooks
Proportion of people
earning less than the
living wage
17.5% 14.6% 17.4%
The provisional figure for the proportion of employees earning less than the living
wage, based on workplace by local authority is obtained from the Annual Survey of
Hours & Earnings (ASHE). This is an Office for National Statistics (ONS).
West Dunbartonshire has been provisionally set at 14.6%, and Scotland at 14.4% for
2021.  These figures are due to be revised in November 2022.
Stephen
Brooks
Action Status Progress Due
Date Comments Managed By
Ensure no one left behind by
addressing life challenges and
reducing costs
31-Mar-
2022
This action has been completed. We are reviewing our activity and associated targets in the
light of our experience of service delivery during and beyond COVID-19 restrictions. In
addition, we are also reviewing how we gather information to demonstrate how we support
people to reduce costs by managing debt. We have set an interim target while we review the
Stephen
Brooks
ITEM 6 APPENDIX 1
Page 10

Page 11

Action Status Progress Due
Date Comments Managed By
approach and in the first quarter of the current financial year we have supported our service
users to manage approximately £364,941 of debt.
In addition, we are developing approaches as part of the aim to address the cost of living
crisis. This includes supporting local food banks to develop their services and address food
insecurity. We are also supporting activity to address fuel poverty through our Improving the
Cancer Journey project, Family Opportunity hub and Information and Advice partnership.
Promote inclusive growth through
access to opportunity
31-Mar-
2022
This action has been completed. We have prepared the statistics and backbone of the report.
We are discussing the future development with the Chief Officer Housing and Employability
with a view to submitting a proposals for delivery in the next financial year
Stephen
Brooks
Increase employment and training opportunities
Performance Indicator
2020/21 2021/22
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
% of households that are
workless 19% 19% 21.8% The most recent publication relates to period January to December 2020, which was
released on 21 October 2021, shows the rate for West Dunbartonshire as 19%
Stephen
Brooks
% of local people with
increased or sustained
income through reduced
debt liability/debt
management
86.7% 90% 90%
Changes introduced by the Government during the Covid period put a moratorium on
debt recovery on some debts which reduced the number of people accessing support
for debt.  As these changes begin to reverse and the cost of living increases kick in,
we will expect to see an increase in the number of people presenting to the service in
2022/23 with debt issues.
Stephen
Brooks
Action Status Progress Due
Date Comments Managed By
Support quality frameworks and
partnership working to enhance
work, learn, money service provision
31-Mar-
2022
This action has been completed. We have presented our evidence for the CLD Standards Mark
and feedback has been positive. In addition our Modern Apprenticeship service has undergone
a quality review. This was a positive experience and our service for supporting apprenticeships
is officially very good.
Stephen
Brooks
Page 11

Page 12

Action Status Progress Due
Date Comments Managed By
Further progress has been made in preparation of the second phase of No One Left Behind (a
new approach to employability). In addition to developing the partnership and establishing
West Dunbartonshire Council as the lead agency, we have developed a three year plan that is
consistent with the Scottish Government guidance and this will guide our future developments
and priority actions.
In addition, we have established a grant approach for distributing funds to partners for service
delivery. This is consistent with expectations outlined in the COSLA/Local Authority agreement.
In a completely new departure for the W4u service, we have staged a competitive grant
process and awarded approximately £800,000 to third sector, private sector and further/higher
education partners. This means we have a comprehensive support network available for people
seeking to overcome barriers to opportunity.
The Local Child Poverty has been finalised. However this is an annual report and next steps are
to carry out a review of actions. This will take into account the emerging priorities and funding
opportunities that will be made available through the Scottish Government plan to address
child poverty.
We have prepared a Statement of provision for period products. This is a regulatory
requirement and has to include the views of service users in the development of the provision.
As such we conducted a community-based consultation to develop the service. The statement
has been prepared and published and contains all information about locations, products and
means for obtaining products.
Risk Current Risk Matrix Target Risk Matrix Latest Note Managed by
Failure to respond to child poverty
legislation will have a significant impact
on the Council’s reputation, more
importantly an opportunity to raise
issues and respond more effectively to
child poverty issues will be lost
We have complied with the guidance for the production of local child poverty
reports. We have also reviewed the new national plan and we are in a good
position to compile the 2022 plan as required. Stephen
Brooks
Universal Credit Full Service changes
breadth and depth of demand for
services.
Migration of all claims to Universal
Credit may lead to increased service
demand from people who would not
have used Working 4U service
otherwise.
We are working with the third sector through the Information and advice
partnership to obtain more information about the impact of changes in UC and to
develop appropriate responses.
We anticipate an increase in demand for welfare rights services as a result of the
reduction of UC payments (£20 a week) introduced at the start of the COVID-19
pandemic. We are working with local partners to establish an appropriate service
response.
Stephen
Brooks
Page 12

Page 13

Risk Current Risk Matrix Target Risk Matrix Latest Note Managed by
Failure to identify alternative funds to
replace European Structural funds will
increase uncertainty and loss of staff to
other services
Discussions about the future prosperity funds have commenced and it is
suggested that new funds to replace ESF will be in place by September 2022. We
have extended our ESF programme until June 2023. As such we have developed a
plan for transition that will allow for some slippage in the UK Government
timescales.
Stephen
Brooks
Efficient and effective frontline services that improve the everyday lives of residents
A continuously improving Council delivering best value
Action Status Progress Due
Date Comments Managed By
Develop a Housing Academy to
provide training and development for
housing employees and tenant
leaders
31-Dec-
2022
Action delayed - While the original date of delivery has been amended as a result of the
pandemic and the service and key officers responding to priority challenges.  Positive progress
has been made and we've engaged with a number of national organisations to assist in the
delivery of the Academy.  It is intended that a final scoping paper be submitted to the next
Housing Improvement Board with a view that the Housing Academy be launched by the end of
2022.  The action will be incorporated into the 20/23 Delivery Plan
John Kerr
Successfully implement the IHMS
into service delivery across all
building services teams
31-Mar-
2022
Action completed – Significant progress has been made in partnership with Building Services
using the IHMS (QL) as an enabler to drive forward improvements and efficiencies within
Building Services.  While the action is complete we will continue to progress work in this area
to ensure ongoing improvements particularly for our tenants.
John Kerr
Digital inclusion – carry out review of
provision of wifi inclusion into new
build properties and priority areas of
deprivation
31-Mar-
2022
Action partially completed – While we have included connectivity provision in our new build
programme going forward and all new builds will be wi-fi enabled, in terms of our existing
stock we have experienced some delays in developing a number of pilot initiatives due to legal
and contractual issues however we would anticipate that these will be in place by Q3 2022.
These will be in addition to the ongoing CityFibre developments which will serve all council
properties within the wider programme.
John Kerr;
Nicola
Pettigrew
Develop and implement revised ASB
strategy
31-Mar-
2022
We are currently undertaking a review of operational practices, recording and reporting
systems which links in to a wider review of our processes across all housing operational
Nicola
Pettigrew
Page 13

Page 14

Action Status Progress Due
Date Comments Managed By
services. A working group has been established and findings will be used to inform future
service improvements. Part of this process will include peer review with other LA’s in terms of
ASB strategies. An EIA has been commenced for the review of the ASB Strategy and it has
been tabled at the Safe DIG that the ASB Strategy will be progressed by all partners as part of
this group, with a revised target of 31 Mar 2023.   The service has developed an ASB Policy
document which is currently being finalised and will be tabled at the WDTRO in August 2022
for input/views and comments, before finalising and publication.
Sustainable & attractive local communities
Action Status Progress Due
Date Comments Managed By
Continued improvement of the
existing CCTV infrastructure and
development of an options appraisal
for future investment.
31-Mar-
2022
This action is progressing as planned. The team have secured a number of trial cameras that
are currently on-site and have be invaluable to date in assisting Police Scotland in a number of
enquiries. The next step will be the procurement of a limited number of cameras to be located
in key locations. Five new redeployable cameras are on order, funded through the HRA.  The
Council’s SPF bid to the UK Government includes a capital bid for CCTV to promote safety and
wellbeing.  The TUPE transfer of CCTV monitoring staff to the Communities Team has been
completed.
Elaine Troup
Develop and implement Housing
regeneration approaches to improve
our communities
31-Mar-
2022
Action completed - Most recent activity centres around the regeneration focus in the North
Mountblow area of Clydebank and the wider new build housing areas.  Our new LHS has
highlighted a number of regeneration housing areas which will be prioritised during the length
of the LHS, therefore housing led regeneration of our communities will be a long term intrinsic
part of what the service delivers.  These will be continued to be reported to the Housing and
Communities Committee through our More Homes Better Homes West Dunbartonshire
approach.
John Kerr
Develop our Housing Asset
Management to respond to Climate
Change
31-Mar-
2022
Action completed There are a number of housing specific actions which have been incorporated
into the Council’s Climate Change Strategy which was approve by Council in October.  These
actions are incorporated into the existing Better Homes Asset Management Strategy. We will
also deliver a new Housing Capital Investment Programme for 2022/23 with a focus on
sustainability.
John Kerr
Deliver new Local Housing Strategy 31-Mar-
2022
Action completed – The new West Dunbartonshire Local Housing Strategy was approved in
February 2022 and sets out the vision for housing in West Dunbartonshire over the next five
year period.  An implementation delivery group has been established to provide strong and
robust delivery governance of the strategy.
John Kerr
Page 14

Page 15

Risk Current Risk Matrix Target Risk Matrix Latest Note Managed by
Failure to secure funding to invest in
WDC’s CCTV infrastructure.
With the recent addition of a new CCTV Team Leader post, progress in this area is
anticipated to accelerate. This will include consideration of alternative funding sources to
secure much needed investment in the system.
Until resources can be secured and improvements made the Council does remain at risk
from reputational damage, should the system fail. The risk levels remain the same.
Elaine Troup
Meaningful engagement with active, empowered and informed citizens who feel safe and engaged
Fully consulted and involved citizens who are able to make full use of the Community Empowerment Act
Performance Indicator
2020/21 This is
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
% of residents aware of
the community
empowerment 2015 Act
34% 27% 34%
Residents reporting awareness of the Community Empowerment (Scotland) Act
2015 has declined from the previous year, despite this the Communities team have
continued to engage with residents on a range of topics including PB, Community
Volunteering as well as the Scheme of Establishment for Community Councils. The team
will continue to work in partnership with the community to identify key priority areas
and promote community decision making.
Elaine Troup
Action Status Progress Due
Date Comments Managed By
Develop a detailed Delivery Plan
through consultation with CPWD and
the local community to ensure the
aims of the CE Strategy are
deliverable.
31-Mar-
2022
Work is now well established and Year 1 priority projects continue to progress. Projects include
Participatory Budgeting mainstreaming, in line with the councils 1% mainstreaming ambition,
this pilot project has been completed and at evaluation stage; review of Community Asset
transfer; Development of a Communications plan in consultation with residents; Awareness
raising and training across the workforce, partners and communities. Scheme for the
Establishment of Community Councils: The third and final phase of consultation is now
complete. The final papers were presented and approved at a Special Council meeting on 25th
May 2022.  The team are now working on implementing the proposed improvements.  While
some projects will take longer than 12 months to complete, the project board will be asked to
reflect and decide on appropriate Year 2 projects.
Projects include: Developing partnership agreements on the shared use of space to promote
improved collaboration alongside reduced costs and examine opportunities to offer spaces for
Elaine Troup
Page 15

Page 16

Action Status Progress Due
Date Comments Managed By
community groups to meet at no or minimal cost; Develop and deliver a programme of
training across the community on the National Standards for Community Engagement;
Development of an Employee Volunteering Policy; Wider roll-out of the Community Soup Model
of PB to encourage community take up; and Develop material to support PB mainstreaming
and roll-out a programme of training across the workforce and WD communities. Approval of
these further projects will help to define the Community Empowerment delivery work
programme into 2022/23.
Complete the Review of the Scheme
for Establishment for Community
Councils
31-Mar-
2022
Following presentation of the draft Scheme to a Special Council meeting in May 2022, the new
Scheme is not approved and completed. Elaine Troup
Lead on the Council’s approach to
Participatory Budgeting
Mainstreaming
31-Mar-
2022
The pilot project worked on a total budget of £100,000, consisting of equal contributions from
WDC Greenspace and Health & Social Care Partnership mainstream budgets. Citizens were
empowered to make decisions about spending on projects focusing on improving green spaces,
walking and cycling routes and Health & Well Being. The pilot opened to the public vote in mid-
April, with 267 votes across Consul and Young Scot platforms, with the full budget being
allocated across two projects in Breval Park and Hardgate Knowes, work is now underway.
A draft PB mainstreaming policy and approach document was presented to PRMG in late
March. This promoted a corporate approach to ensure that all relevant service areas
contributed to the annual reporting to Scottish Government against the 1% target. The pilot is
now being evaluated and will be reported to the PB steering group, subsequent actions to
ensure a culture of participation across the local authority, will be taken to the Community
Empowerment Project Board in September 2022.
This work stream will continue into 2022/23.
Elaine Troup
Risk Current Risk Matrix Target Risk Matrix Latest Note Managed by
Failure to secure community and partner
buy-in for the emerging Community
Empowerment Strategy and Action Plan.
The risk profile will remain the same despite significant progress being made with a
number of priority projects. Elaine Troup
Page 16

Page 17

Risk Current Risk Matrix Target Risk Matrix Latest Note Managed by
Failure to deliver on the capacity building
of the Community Empowerment
(Scotland) Act
The risk levels remain the same despite significant progress being made to support
communities across the authority through increased levels of capacity building. Elaine Troup
Failure to sufficiently engage with groups
and citizens as part of the Review of the
Scheme of Establishment for Community
Councils
Following two very successful engagement phases this project is now in the third and
final phase. To date the level of active engagement has been significant and as a
result the risk level has been lowered.
Elaine Troup
Failure to deliver sufficient community
capacity building / community
development support to groups impacted
by COVID-19.
The Communities Team continues to support a range of community organisations to
re-start or develop on the back of the pandemic. The team is now structured in such a
way that we have a dedicated capacity building resource available to support.
As a result of these changes and the number of groups supported during 2021/22 the
risk levels has been reduced.
Elaine Troup
Open, accountable and accessible local government
Equity of access for all residents
Performance Indicator
2020/21 2021/22
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
Tenancy Sustainment
Levels within Housing
First
60% 93% 80%
Target met for overall sustainment rate for the year. We continue to scale up our
Housing First initiative as part of the delivery of our wider Rapid Rehousing
Transition Plan with tenancy sustainment rates remain high.
John Kerr
The number of incidences
of youth homelessness in
West Dunbartonshire is
reduced
310 309 264
Target not achieved.  We have seen an increase in youth homelessness levels over
the past 2 years, an element of this can be attributed to changing behaviours as we
come out of the pandemic.  In addition we have also seen an increase in
homelessness prevention cases.  We have analysed a number of the underlying
reasons and have developed additional preventative activities that have been
implemented over the last year.  Our ongoing research programme with Action for
John Kerr
Page 17

Page 18

Performance Indicator
2020/21 2021/22
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
Children will also identify and allow the service and partners to implement additional
housing solutions
Supported individuals, families and carers living independently and with dignity
Enhanced Life Chances
Action Status Progress Due
Date Comments Managed By
Scale up Housing First 31-Mar-
2022
Action completed and met our housing first targets, We continue to develop a more whole system
approach to homelessness through our Housing First initiative within the financial limitations John Kerr
Develop new Young
Persons housing options
service
31-Mar-
2022
Action completed – We have developed a number of new options to promote successful housing solutions
for our young people including our shared tenancy project which was piloted in Clydebank and has now
been rolled out across the local authority area.  Our research programme will also identify additional
recommendations to ensure we deliver to meet the housing need of West Dunbartonshire’s young
people.
John Kerr
Ensure no one left behind
by addressing life
challenges and reducing
costs
31-Mar-
2022
This action has been successfully completed. We have re-set the working relationships with external
partners to ensure that we continue to deliver services that address these issues. In addition we have
reviewed actions within the context of the local child poverty action plan and work is ongoing to develop
our approach.  We have reviewed the approach and paid out a further £100,000 of hardship funds. This
uses the funds that are available and we are in discussions about extending the support into the new
financial year (2022/23)
Stephen
Brooks
Maximise income from
benefits
31-Mar-
2022
This action has been successfully completed. We have established a set of stretch targets that aim to re-
set service levels at pre-covid levels and will review progress routinely. We carried out quarterly reviews,
including peer reviews, resulting in the development of a three year action plan. We will continue to
review the progress against the dashboard indicators to ensure continued success.
Stephen
Brooks
Maximise income from
employment
31-Mar-
2022
This action has been successfully completed. We have established a number of employability
programmes and have supported over 400 people into work. This is a higher number than anticipated at
this time and reflects the work we are doing through the employability team (ESF) and youth learning
(Young Persons Guarantee and Kickstart). In addition to this we established the required process for
encouraging proposals for submission to the Community Renewal Fund. Through this process we
submitted 14 projects to the UK Government for their consideration. These projects included
employability and training, business development and community based projects. We are awaiting
further information about these proposals from the UK Government. We established a local employability
Stephen
Brooks
Page 18

Page 19

Action Status Progress Due
Date Comments Managed By
partnership plan and through partnership consultation we have identified the priorities for the parental
employability support fund.
More affordable and suitable housing options
Performance Indicator
2020/21 2021/22
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
Number of new supply
social housing for rent 110 506 680
Over the last five years we had an ambitious target to deliver 1000 new homes, in total
at the end of year five we delivered a total 942 new supply of social housing for rent. In
year five we fell slightly short of the target in terms of delivering on the target within
the final year. Overall the project was successful, however affected by delays as a result
of the pandemic.
John Kerr
% of all homeless cases
re-assessed within 12
months (repeat
homelessness)
5.4% 5.23% 5%
Target not met – Although levels of repeat homelessness have declined in 2021/22 we
have not met our 5% target. Analysis of all repeat cases of homelessness is carried out
on an ongoing basis and key drivers are when an applicant has lost contact with the
service and then represents or when there has been a relationship breakdown and
further assistance is required. Repeat homelessness in West Dunbartonshire remains
below the Scottish average figure.
John Kerr
% of tenants satisfied
with the overall service
provided by their landlord
78.53% 78.53% 84%
Target not met - data is from the comprehensive Tenant Satisfaction Survey carried out
in 2019. Disappointingly overall satisfaction decreased and an improvement plan was
subsequently agreed and implemented. A key driver of overall dissatisfaction is relating
to the repairs service and improvements in this area should drive increased satisfaction
levels more broadly. We are required to report updated tenant satisfaction data at least
every 3 years and a further comprehensive satisfaction survey will be carried out in
Autumn 2022.
John Kerr
Average length of time to
re-let properties 56.14 45.77 25
Performance significantly deteriorated as a result of Covid. Significant progress has
been made from the previous year, nevertheless re-let times continue to be an area of
concern. A number of improvement measures have been put in place to improve
performance in the longer term, these include daily meetings within team,
improvements to our IHMS system, full comprehensive review of the waiting list,
enhanced monitoring reports and the establishment of the void working group. This
work will continue to be a priority over the coming year.  It is encouraging to note that
in quarter one of 21/22 there has already been considerable improvement, with the
average days to let reporting as 35 days.
Nicola
Pettigrew
% Unemployed People
Assisted into work from 16.23% 21% 14.5% W4U assisted 420 people into employment during 2021/22. This number surpassed our
original target of 294.  Using the most recent model based unemployment figure, this
Stephen
Brooks
Page 19

Page 20

Performance Indicator
2020/21 2021/22
Notes & History Latest Note Managed By
Value Status Value Target Short
Trend
Long
Trend
Council operated / funded
Employability
Programmes
equates to 21%.  Official data is expected to be published by Improvement Service
around November 2022.
% of council rent that was
lost due to houses
remaining empty
1.2% 1.29% 0.88%
Performance significantly deteriorated as a result of Covid. Target not met, the first half
of 2021/22 significant progress was made to improve performance in this area however
the quarter has seen performance slip again. Measures such as the void working group
and target resources are among some of the measures. This work will continue into the
coming year to improve performance in the long term.
Nicola
Pettigrew
% of Households in Fuel
Poverty 29% 29% 23%
The most recent data released February and covers the period 2017-2019.  An
estimated 29% of households were in fuel poverty in West Dunbartonshire.  This is
higher than the estimate for Scotland of 24%. 9% were considered to be in extreme
fuel poverty in West Dunbartonshire, less than the estimated 12% for Scotland.
Performance has been affected by exceptional cost of energy.
Stephen
Brooks
% of Children living
poverty (after housing
costs)
26.8% 26.8% 25%
The most recent available data relates to 2019/20 and indicates 26.8% of children aged
0-15 years in west Dunbartonshire are living in households with below 60% median
income after housing costs, compared to 24% in Scotland.
Stephen
Brooks
% of residents who feel
safe/very safe in their
local community
96% 93% 98%
Target narrowly missed, despite this, performance overall represents a consistently high
feeling of safety throughout the year. Nicola
Pettigrew
Action Status Progress Due Date Comments Managed By
Deliver New build Housing
programme 31-Mar-2022 This action has been completed successfully, in 2021/22 we have delivered 306 new
Council homes. John Kerr
Risk Current Risk
Matrix Target Risk Matrix Latest Note Managed by
Failure to achieve the outcomes of the
Scottish Social Housing Charter
Council has a robust self-assessment framework in place in terms of meeting the
requirements of the Scottish Social Housing Charter John Kerr
Page 20

Page 21

Quality Standards
2021/22
Latest Note Managed By
Status Value Target
% of application outcomes communicated
within 28 days 99.6% 100%
Continued excellent performance against this PI is being sustained with 99.6% of all
homeless applications being assessed within 28 day target time in despite a significant
increase in presentations (this equates to only 5 cases not being assessed within target
during 2021/22).
John Kerr
% of applications followed up for discussion
within 7 working days Data not available 100%
A comprehensive review of the housing waiting list was completed by end March 2022. As a
result contact was made with all housing applicants and a review of their application needs
was completed.
Nicola Pettigrew
% of ASB reports followed up within 1
working day. 100% 100% Target met. The ASB team followed up all reports made to the service including calls and E-
Mails received via the ASB Helpline or Inbox within 24hrs. Nicola Pettigrew
% of referral acknowledgements sent within 5
working days of notification 100% 100% All acknowledgments have been sent within 5 working days and an automated response
system has been implemented to ensure this is maintained going forward. Stephen Brooks
% satisfied with the quality of temporary or
emergency accommodation 86% 89%
Target not met – there has been a slight drop in satisfaction levels with temporary
accommodation in Q3 due in part to pressures on the service and limitations on what is
able to be offered in terms of location. Feedback from the satisfaction surveys is shared
and any areas for improvement acted on.
John Kerr
Action Status
Overdue; Neglected
Check Progress
Completed
PI Status
Alert
Warning
OK
Long Term Trends
Improving
No Change
Getting Worse
Short Term Trends
Improving
No Change
Getting Worse
Page 21

Page 22

Page 22

Page 23

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution & Property
Committee: Housing and Communities Committee: 24 August 2022
Subject: Housing Asset & Investment Delivery Plan 2021/22 Year End
progress 
1 Purpose
1.1 This report provides members with the year-end progress of the 2021/22
Delivery Plan. 
2 Recommendations
2.1 It is recommended that Committee:
• Notes progress made on the delivery of the 2021/22 plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Progress is reported to this Committee at year end for the first time. Progress
at mid year was reported to IRED Committee as part of the wider SD&P
delivery Plan.  
4. Main Issues
4.1 The 2021/22 SD&P Delivery Plan was presented to IRED Committee on 12
May 2021 and mid-year progress reported on 17 November 2021.
4.2 The Delivery Plan for 2021/22 was supported by an action plan of activities to
be delivered over the year. Appendix 1 details the progress on delivery of this
action plan.
4.3 All of the seven actions have been completed in year as planned.
4.4 Year end values are available for all seven PIs set out in the plan, one met or
exceeded targets (green) two narrowly missed target (amber) and four were
further adrift of targets (red). The latter relate to the following;
• % of council dwellings that meet the Scottish Housing Quality
Standard.
ITEM 7
Page 23

Page 24

• Percentage of council houses that are energy efficient.
• Average length of time taken to complete emergency repairs.
• Average time taken to complete non-emergency repairs.
4.5 One performance indicators showed improvement in both the short and long
term trend, two showed improvement in the short term trend. 
4.6 Each service area also developed a suite of quality standards, which set out
the level of service that users and stakeholders can expect to receive, and
remind both the organisation and employees of the challenges and obligations
they face in delivering best value services. Of the two PIs measuring quality
standards, both were further adrift of targets (red). Full details are set out in
Appendix 1.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Supply, Distribution and Property
may have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The Delivery Plans set out actions to support the successful delivery of the
strategic priorities of the Council.
Page 24

Page 25

Chief Officer: Angela Wilson
Service Area: Supply, Distribution and Property
Date:  17 August 2022
________________________________________________________________
Person to Contact:  Karen Connelly
karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: SD&P HA&I Delivery Plan 2021/22 - Year-
end Progress and Quality Standards.
Background Papers: 2021/22 SD&P Delivery Plan Report – IRED Committee,
12 May 2021
2021/22 SD&P Delivery Plan Mid-year Report – IRED
Committee, 17 November 2021
Wards Affected: All
Page 25

Page 26

Appendix 1: SD&P HA&I Delivery Plan 2021/22 Year-end Progress
2. Supported individuals, families and carers living independently and with dignity
More affordable and suitable housing options
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
% of council dwellings that meet the
Scottish Housing Quality Standard 79.18% 18.17% 86.15%
Target Not Met
An increase in SHQS failures due to the
Electrical Installation Condition Reports
(EICRs) programme not being completed as
planned by the end of March 2022. The
programme has been delayed due to COVID
impact on internal and external resource
availability to deliver the programme as
planned. We have since secured additional
resource to deliver the programme as early
as possible. To ensure the programme
continues to accelerate all our housing stock
to full compliance in terms of EICRs we are
undertaking proactive communications with
tenants to minimise any access issues.
Alan Young
Percentage of council houses that are
energy efficient 82.84% 83.7% 100%
Target Not Met
Work continues incrementally each year to
increase the number of homes meeting the
energy efficiency standard for social housing
EESSH. Compliance continues a positive
trend and 22-23 capital programme will
continue to improve those homes not meeting
the standard.
Alan Young
Page 26

Page 27

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Action Status Progress Due Date Note Owner
Ensure the Council’s Housing stock progresses towards
the achievement of the energy efficiency standard for
social housing.
31-Mar-2022
Whilst work has progressed well and monthly completions
increasing towards targets. Programme has been impacted by
effects of COVID on access, labour and materials availability.
Alan Young
Deliver the HRA Capital Investment programme for
2021/22 31-Mar-2022 Main work streams for 21/22 progressed well considering impact
and restrictions of COVID. Alan Young
Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality Standard
and reduce the number of properties held in abeyance.
31-Mar-2022
Main work streams progressed well, however, issues with
adequate resources in UPVC, Kitchens, Bathrooms and SNA
although this has been improving throughout the year. Building
Services are the main delivery team and have procured additional
contractor support to help delivery of programmes noted above.
It is recognised that compliance level is not where we want it to
be, in the main due to low level of EICR compliance (see SHQS PI
above) compliance level will increase as EICR’s are completed and
progress continues with EESSH work. Officers continue to engage
with owners to encourage participation in door entry projects to
incrementally reduce those properties in abeyance.
Alan Young
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Failure to meet citizen
expectation and service
standards
Risk of citizen dissatisfaction due to us
not doing what we say we will when
we say we will or not completing
required works first time.
31-Mar-2022
Customer service improvement plan
actions have been completed. Customer
satisfaction increased in 2021 / 2022 to
87.7% from 3162 surveys completed.
No change to risk matrix at year end
Martin Feeney
Failure to deliver medical
adaptations in agreed target
timescales
This is monitored to ensure target
timescale of 60 days average for
housing medical adaptations is
adhered to ensure satisfaction with the
service and support those in need of
this service.
31-Mar-2022
Good in-year progress and cleared many
legacy applications, however overall
average days number will still be high
due to older jobs completing.
No change to risk matrix.
Alan Young
Page 27

Page 28

5. Efficient and effective frontline services that improve the everyday lives of residents
A continuously improving Council delivering best value
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of repairs appointments
kept 94.87% 89.72% 93%
Marginally missed target. During 2021-22
28,730 appointments were made with
25,807 within their appointment slot.
Resource shortages due to Covid contributed
to appointment failures.
Martin Feeney
% of properties that require a gas
safety record which had a gas check
and record completed by the
anniversary date
97.7% 100% 100% Target achieved. Martin Feeney
Percentage of reactive repairs carried
out completed right first time 89.76% 86.49% 90%
Marginally missed target Right First Time
target due to ongoing issues from covid
restrictions, backlog of repairs and
resourcing issues.
Martin Feeney
Average length of time taken to
complete emergency repairs 6.14 5.81 4
Despite missing target an improvement has
been made compared to the previous year.
There were 5959 emergency repairs
completed in 2021-22.  Performance
impacted by resource issues including high
levels of absence particularly due to covid
and isolation requirements. We continually
work with services to ensure all emergency
repairs are correctly categorised and
resources directed correctly.
Martin Feeney
Page 28

Page 29

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Average time taken to complete non-
emergency repairs 6.76 10.16 7
As expected, target not met due to the
volume of non-essential repairs reported
which could not be complete whilst Covid
restrictions were in place between March
2020 and 26 April 2021. When restrictions
lifted we prioritised those backlog over new
non urgent repairs reported in 2021-22.  This
resulted in average days to complete repairs
increasing compared to previous years.
Martin Feeney
Action Status Progress Due Date Note Owner
Successfully implement the IHMS into service delivery
across all building services teams 31-Mar-2022
Building Services full IHMS support team in place with IHMS
Change Officer, Senior Job Scheduling Planner and all Job
Scheduling Planner posts now filled. This is providing the resource
and support to deliver improvements in the use of the QL system.
Improvement initiatives have been successfully implemented as
planned in 2021/22, a new action will be included in the 2022/23
delivery plan to monitor the improvements already in place and
those still required to be delivered in 2022/23.
Martin Feeney
Introduce project management approach to ensure
continued implementation of the building services
improvement plan (Phase 1)
31-Mar-2022
Phase 1 of the revised structure is being implemented and
satisfactory progress is being made. The overall action will run
into 2022/23 to allow for recruitment of all posts included in
phase 1 and a new action will be introduced to monitor progress
and deliver associated actions in the 2022/23 plan.
Martin Feeney
Review, develop and test new financial costing /
charging model for Building Services work 31-Mar-2022
The new recharge model has been introduced from April.
Development, performance and progress will continue to be
monitored and reviewed on a monthly basis. 
Martin Feeney
Develop the plan to address the outstanding council
house repairs (due to COVID-19), Inform tenants and
undertake repairs within agreed timescales.
31-Mar-2022
Action completed for outstanding repairs reported during in
lockdown periods. Additional system functionality “Locator plus”
application is now live. The level of repair orders closed due to no
access reduced in quarter 4 compared to quarter 3 and the right
first time repair performance also improved although target was
not achieved. Additional resource have been assigned to ensure
timescales are improved on enquiries and complaints and the
number of outstanding complaints did reduce significantly.
Martin Feeney
Page 29

Page 30

Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Failure to implement
improvement plan to ensure
Building Services are fit for
purpose
The implementation of the
improvement plan will enhance the
effectiveness, efficiency and best value
of Building Services
31-Mar-2022
Good progress made in 2021/2022 with
a number of key actions within the
improvement plan completed.
No change to risk matrix at year end.
Martin Feeney
Failure to implement IHMS
system across building
services
The effective implementation of the
IHMS system will delivery efficiency,
improve case tracking, capture
customer satisfaction and improve
service delivery.
31-Mar-2022
All vacancies have been filled including
IHMS and Change Officer, Senior
Planner and vacant Job Scheduling
Planner posts. A comprehensive
improvement action plan has been
developed with various workgroups set-
up to implement improvement required.
No change to risk matrix for year end.
Martin Feeney
Failure to demonstrate robust
financial and productivity
systems within building
services
The development of new costing model
will mitigate against this financial risk.
Process change and review will
improve the system for charging of
works
31-Mar-2022
Regular finance meetings including Chief
Officers from SD&P, H&E and Resources
(Chief Finance Officer) supporting the
service to achieve robust financial
management is in place. Regular
focused meetings in place to discuss and
monitor improvements in data, systems,
processes, workforce and productivity.
A new financial charging model aims to
provide increased visibility and
streamline processes.
Current risk matrix amended with
likelihood reducing from 3 to 2 and no
change to impact.
Martin Feeney
Action Status
Overdue
Completed
Page 30

Page 31

PI Status
Significantly Missed Target
Narrowly Missed Target
Met or Exceeded Target
Long Term Trends
Improving
No Change
Getting Worse
Short Term Trends
Improving
No Change
Getting Worse
Risk Status
Alert
High Risk
Warning
OK
Appendix 2: Quality Standards - Year-end Progress
SD&P HA&I Quality Standards
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Annual review and assessment of
ISO 9001:2015 successfully
completed ensuring continuing
suitability and conformance with no
major non-conformance issues
identified.
100% 0% 100%
We were unable to maintain the ISO
accreditation in 2021/2022 due to covid.  We
will reapply for the accreditation at
appropriate date to be confirmed.
Martin Feeney
Page 31

Page 32

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Average time taken to complete
medical adaptations
75.7
123.25
87.4
107.84 60
Target not met. 
Performance in 2021/22 continued to be
affected by the previous restrictions in
activity due to Covid-19 and the backlog that
this created.
Activity in terms of carrying out medical
adaptations has now resumed. The number
of medical adaptations completed increased
from 119 in 2020/21, to 313 in 2021/22,
with the number of households waiting for
adaptations to be completed reducing from
134 at the end of 2020/21, to 49 at the end
of 2021/22.
However, completing a large number of
legacy applications which had been on the
list for some time, affected the overall
average days taken to complete medical
adaptations which was 107.84 days. This
remains above our target but was an
improvement from 123.25 days in 2020/21.
Both internal and external resources are
being utilised to increase completions and
further improve performance during
2022/23.
Alan Young
PI Status Long Term Trends Short Term Trends
Page 32

Page 33

Significantly Missed Target
Narrowly Missed Target
Met or Exceeded Target
Improving
No Change
Getting Worse
Improving
No Change
Getting Worse
Page 33

Page 34

Page 34

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 24 August 2022
__________________________________________________________________
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme 
1. Purpose
1.1 This purpose of this report is to provide the Housing and Communities
Committee an update on progress with West Dunbartonshire’s More Homes
Programme which oversees the delivery of the Council’s new home building
programme.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach
including the forthcoming practical completion and handover of the latest
development project at Queens Quay (Site B) scheduled for early
September subject to meeting all planning conditions; and
(ii) Approves the commitment that all future new homes programmed within
our More Homes delivery programme building are consistent with our Net
zero ambitions outlined within 4.4 of this report;
(iii) Approves the undertaking to conduct procurement exercises for identified
sites within the Future New Build – West Dunbartonshire Affordable
Housing Supply Programme. Refer to Table 2: Identified Additional Future
Sites
(iv) Approves the undertaking to conduct procurement exercises for the
maintenance contracts required for Net Zero technologies including Solar
Panels and MVHR (Mechanical Ventilation with Heat Recovery) units as
referenced in 4.19 of this report, and approves the revenue spend
included in this report including approval to explore and secure multi-year
contracts, contracts utilising framework agreements (FA) or contracts
utilising dynamic purchasing systems (DPS) beyond the term of approved
budgets where efficiencies and savings can be achieved;
(v) Approve the transfer of the site at Old Bonhill referenced at 4.18 of this
report from the General Fund to the Housing Revenue Account for the
delivery of new Council homes for £160k subject to clear title.
ITEM 8
Page 35

Page 36

3. Background
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which was initially tasked and has successfully delivered over 1000 new
affordable homes in West Dunbartonshire by 2022 and includes the Council’s
own ambitious New House Building Programme.
3.2 The Council’s latest practical completion will take place at the Queens Quay
development in September this year delivering 29 new Council homes in a
key regeneration area as part of a wider development which has delivered
146 new social rented homes.  This, is in addition to the completion of the
Council’s first fully dementia designed development at Creveul Court,
Alexandria and other exemplar developments in Haldane, Aitkenbar,
Bellmsyre, Dumbarton Harbour and St Andrews, Clydebank.  The Council
have now completed 12 new build developments since 2013 and are the
largest developer of social homes in West Dunbartonshire delivering 496 new
homes to date as outlined in Table 1 below:
Table 1:  Completed Council New Build
Project No. of
Units
Completion
Date
Granville Street (Phase 1), Clydebank 24 July 2013
Miller Road, Alexandria 15 October 2013
Granville Street (Phase 2), Clydebank 9 February 2014
Central Bellsmyre, Dumbarton 36 December 2014
Hillstreet Square, Dumbarton 37 August 2015
Second Avenue, Clydebank 40 April 2018
Creveul Court, Alexandria 22 April 2021
Aitkenbar Primary School 55 July2021
Haldane Primary School 58 August 2021
St Andrews, Clydebank 126 October 2021
Dumbarton Harbour, Dumbarton 45 December 2021
Queens Quay, Site B, Clydebank* 29 August 2022
Totals 496
*Scheduled to complete on 19th August 2022
3.3 The Strategic Housing Investment Plan (SHIP) 2022-2026, outlining West
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach was approved by the Housing and
Communities Committee in November 2021. A new SHIP is being prepared
and will be presented to the November meeting of the Housing and
Communities Committee.
4. Main Issues
Net Zero Homes
4.1 Scotland has committed to net zero emissions by 2045, five years ahead of
the other UK nations. If this target is to be met it is essential that major
changes to carbon emissions take place with a 75% reduction by 2030. 
Page 36

Page 37

4.2 The first major milestone is the Scottish Government’s New Build Heat
Standard, where no gas boilers or oil heating systems will be permitted in new
build homes from 2024.
4.3 To help West Dunbartonshire Council’s wider sustainable transition to Net
Zero it is essential that we reconsider how best to heat our homes whilst
simultaneously minimising fuel poverty and creating employment opportunities
within the emerging technologies sector to maximise opportunities for our
communities.
4.4 In terms of our affordable housing delivery programme it is proposed that all
future new homes programmed within our More Homes delivery programme
building on our pathfinder development projects at Pappert and Clydebank
East are optimised for operational net zero, by incorporating renewable
technologies within our new build program, with immediate effect by:
• Incorporating Renewable Technology
• Adopting a Fabric First approach
• Investing in Carbon Sequestration
• Creation of a Green workforce
Incorporating Renewable Technology
4.5 Solar Panels should be considered when orientation and positioning allow.
Solar panels harness energy from the sun to power items within the home.
The solar panels will be “zero-export” to grid.  When incorporated within a
house or cottage flat the tenant will receive direct benefit from the energy
generated. Where solar panels are fitted to blocks of flats the tenants and
landlord will benefit from the supply.
4.6 Heat Pumps are a low carbon source of heating. Heat is absorbed from a
source (water, air or ground) and transferred to a fluid. The fluid is
compressed further to increase the temperature. The heat is transferred form
the fluid into water which circulates around the home to provide heating and
hot water.
Adopting a Fabric First approach
4.7 It is proposed that a strengthened continuation to our fabric first approach to
create highly insulated and airtight homes that will ultimately require less
energy to heat and result in lower utility bills for tenants. The thermal
performance of the building will be enhanced by applying the principles of:
• Passivhaus featuring a mechanical ventilation system with highly
efficient heat recovery; or
• Platinum Aspect Level 1 (Carbon Dioxide Emissions) under Section
7 (Sustainability) of the current building standards. The relevant
standard is noted below:
Page 37

Page 38

4.8 Carbon dioxide emissions under the guidance to Standard 6.1, carbon dioxide
emissions CO2 Dwelling Emission Rate (DER) is to be 100% lower than the
Target Emission Rate (TER) set by the 2010 Standards. To establish this, the
DER should not exceed zero. (This net zero carbon equivalent is a 100%
improvement on the 2007 Standards).
4.9 A typical sustainability label for properties meeting Platinum 1 Carbon Dioxide
Emissions is illustrated below:
Investing in Carbon Sequestration
4.10 We plan to optimise investment in projects to capture and store atmospheric
carbon dioxide, such as supporting the expansion of West Dunbartonshire
Council’s carbon sequestration tree planting program within all future housing
developments, resulting in communities that are rich in biodiversity.  The
Housing Development are already working closely with the Council’s
Biodiversity Officer in maximising opportunities within all planned
developments.
Page 38

Page 39

Creation of a Green Workforce
4.11 It is the aim of the Council to create a Green Workforce within West
Dunbartonshire. Working with Working4U we will engage with stakeholders,
including Skills Development Scotland, to identify upskilling and modern
apprenticeship opportunities within the emerging technology sector. 
4.12 By developing a workforce to address labour shortages within the renewable
sector, such as Solar Panel Maintenance Operatives, it is anticipated that
residents will benefit from increased employment prospects and the Council
will simultaneously make cost savings by delivering future maintenance
contracts in house.
4.13 It is West Dunbartonshire Council’s ambition to deliver new build homes
optimised for a decarbonised grid with a focus on health and wellbeing. A
reduction in energy will result in homes that are more efficient and affordable
to run, with the elimination of fuel poverty. An investment in the creation of a
Green Workforce will ensure that the journey to Net Zero will benefit the wider
community and contribute to West Dunbartonshire Council’s economic
sustainability. By enhancing the biodiversity of our greenspaces and reducing
carbon emissions, our communities will provide a life enhancing environment
for many years to come.
4.14  While the above signifies a strong commitment from West Dunbartonshire
Council to deliver net zero ambitions around our current house building
programme, we will also engage with our Strategic Housing Partners, it is our
ambition to encourage West Dunbartonshire’s Registered Social Landlords to
share our commitment that all new build homes within our future Affordable
Housing Supply Program will comply with Net Zero standards, ensuring that
our communities will provide a life enhancing environment for many years to
come.
More Homes West Dunbartonshire - Delivery Programme
4.15 Building new affordable homes has an important role to play in revitalising
local economies and assisting with post-pandemic recovery plans.  It is also
clear that the need for affordable homes has and will increase. Our More
Homes West Dunbartonshire approach is an ambitious plan that aims to
continue the positive momentum of the delivery of much needed Council
homes in West Dunbartonshire.
4.16 As the biggest affordable housing developer in West Dunbartonshire, the
Council has identified a number of future development sites for new council
homes to address existing and new housing need. The design of these homes
will further develop, improve and exceed current best practice, providing
sustainable homes using innovative technology and delivering on our low
carbon ambitions including passivhaus and other net zero carbon
opportunities.
Page 39

Page 40

4.17 The Strategic Housing Investment Plan and HRA Capital Plan outlined the
plans the Council have for meeting their new build ambitions.  Some of the
initial plans were and continue to be impacted as a result of global issues
revised new build targets for the Council are outlined below:
Table 2: Council New Build Programme
4.18 Updates for each site are noted below:
Queens Quay
We anticipate handover of 29 new Council homes on 9 September 2022, the
developer Wheatley Group are required to ensure full compliance with all
planning conditions to achieve the completion certification.  At the time of
writing there are two notable planning conditions that require to be achieved
around the provision of a car and bike club within the development.  We are
working with Wheatley to ensure that these are achieved and that the final
handovers take place as planned on the 9th September. 
Clydebank East: 
The demolition of 339 properties completed in October 2019.  Design of 88
new build council properties has been underway with CCG and architects
Anderson, Bell and Christie.  The project and was heard at the October 2021
Planning Committee. however, Planning was continued as committee were
concerned at the parking provision provided.
The Planning was approved in June 2022, with an extended parking scheme,
125%, and the inclusion of electric charging points and future proofing of all
parking spaces for the provision of EVs.
This delay has caused considerable financial increases estimated to be in
region of 25%, caused by global construction inflation and the Ukraine
invasion in February, which has resulted in additional pressures on the supply
chain.
Site/Developer Number of Units Est Completion Date
Queens Quay Site B 29 August 2022
Clydebank East,
Clydebank 88 August  2024
Pappert, Bonhill
Alexandria 27 September 2024
Willox Park 17 May 2024
Gap Site Strategy 29 September 2024
Mount Pleasant 25 March 2024
Bank Street 20 January 2025
Queens Quay Site C 20 March 2024
Buyback Scheme 100 Ongoing at 20 per year
Dennystoun Forge 20 March 2024
375 units
Page 40

Page 41

We are now working through the revised planning conditions.  Following
additional and more detailed site investigations we are now also looking at
very significant additional costs to deliver the ground remediation strategy. 
These additional costs place the development at risk due to affordability
issues.  We expect to be in receipt of full information to make an assessment
in early September and we will provide an update to the Housing and
Communities Committee when this has been achieved. This is intended to be
the Council’s first fully zero carbon housing development and marks a
significant milestone in our transition to net zero outlined in paragraphs 4.1-
4.14 of this report.
Pappert, Bonhill
The development of 27 new homes comprises 7 Passivhaus homes and 20
homes meeting the net zero ready standard. 
House Type Sustainability Standard Number of New
Homes
House 3bed/4 person Passivhaus 4
House 3bed/5 person Passivhaus 3
House 3bed/5 person Net Zero 6
House 4bed/6person Net Zero 4
House 4bed/7person Net Zero 1
Flat 2bed/3person w/c Net Zero 3
Flat 1 bed/2person Net Zero 6
Employer’s Requirements and tender documents have been issued to legal
for review. Due to the specialist nature of construction (Net Zero & Passive
House) tender period will be 6-8 weeks. 
Willox Park, Doveholm, Dumbarton
All demolition works are now complete with Practical Completion Certificate
issued to contractor. The site has been secured in anticipation of the
construction phase of the development.
Our specialist contractor commenced site investigation works on 20th June
with drilling completed on 24th June. Groundwater testing and chemical
testing are currently underway. So far no gross contamination has been
encountered and ground conditions are as expected. Final factual report due
in late August. 
The initial design proposals following community consultation will be
presented to the Council’s planning service in advance of any formal planning
submission and this is planned to take place before the end of August.
Page 41

Page 42

Gap Site Strategy
An exercise is currently underway to assess the viability of a number of gap
sites for future housing development within the ownership of HRA. A number
of sites within Bonhill have been identified and approval has been obtained
from the Scottish Government to batch these sites together to form one
project to allow WDC to secure grant funding.  To further support our
ambitions we are in discussions with our Corporate Assets colleagues
regarding the purchase of an area of land located within Old Bonhill.  The
particular site comprises of a rectangular shaped parcel of land that is
generally level and extends to extends to 2,437.46 square metres (0.60 acres)
or thereby.  Approval is sought within this report to transfer the site from
General Fund to the Housing Revenue Account at its gross valuation of
£160k.  A copy of the District Valuer valuation is available as a background
paper to this report.
A similar exercise is underway at Clydebank with the intention of combining
gap sites within Lilac Avenue and Melbourne Avenue. 
In response to families facing overcrowding, it is the intention to deliver a
proportion of larger homes within the gap site developments.
Mount Pleasant, Old Kilpatrick
A number of surveys have been instructed prior to the planned demolition of
the existing building.  While planning in terms of this development is at an
early stage we would seek to deliver a similar development to the recent
Creveul Court development this is supported by a housing needs assessment.
Bank Street, Alexandria
The council is currently developing a proposal for 20 sheltered housing units.
There are a number of infrastructure constraints within the site including a
main sewer which may affect the viability of the site. We are currently working
on pre-planning drawings for submission in August. Requirements from WDC
Roads will be included in these drawings. This project will be required to
present to the Planning and Design Panel due to the town centre location
To facilitate Smollet Fountain resurfacing works, WDC Roads Department are
using the site for their compound until November 2022.
Queens Quay, Site C, Clydebank
The Council is currently developing a design to deliver a projected 20 units on
this site to complement the housing mix within sites A and B.  This
development will also be designed to meet low/zero carbon principles and
linked to the Queens Quay district heating network
.
Pre-planning response was received on the 25th February highlighting
concern of the WDC development proceeding in isolation. We have adopted
a, proactive response to this issue and have developed Masterplan diagrams
Page 42

Page 43

incorporating the surrounding sites and early discussions have taken place to
explore acquiring adjacent land for development by ourselves to deliver more
affordable housing in the Queens Quay regeneration site.  We are also
examining the opportunities for a mixed tenure approach to any expanded
development site.
Buy Back Scheme:
In the financial year ending April 2022, we purchased 14 homes at a cost of
£980,000.
We have a budget of £2.4 million to purchase homes to the financial year
ending 2023 having secured additional grant funding.
To date we have purchased 2 homes, with 3 under offer and we have
targeted to deliver an additional 20 homes each year through our buyback
scheme.
As part of a pilot project, we are refurbishing a semi-detached house at 87
O’Hare, bringing it up to a higher standard than our ready to let standard and
improving energy efficiency of the property.  This will inform our future retrofit
strategy.
Dennystoun Forge Gypsy/Traveller Site
A submission has been made to the Scottish Government for support funding
from their Gypsy/Traveller Accommodation Fund for significant improvements
to the Dennystoun Forge site, including new energy efficient chalets and utility
blocks.  Our proposal has made it to the second round of the bidding process
and we are scheduled to make a presentation to the Scottish Government in
October 2022, following a consultation exercise with site residents.  
4.19 To continue to ensure our new homes meet the needs of our tenants we
require to put in place a maintenance and monitoring contract for solar panel
and MVHR systems.  It is intended that this will be an externally sourced for a
period of 12 months, with an option to extend by an additional year. It is the
Council’s intention to upskill their Building Services workforce during this
period with a view to carrying out the maintenance of West Dunbartonshire
Council’s green technology thereafter. Following committee approval Housing
Development will liaise with procurement partners to carry out a procurement
exercise to secure suitable contractors.
4.20 The Housing Development Team are continuously looking for opportunities to
provide additional new build council homes and will bring any potential site to
the Housing and Communities Committee with as much information as
possible as part of the regular More Homes update paper.
4.21 Our dementia friendly development at Creveul Court received the Association
Public Sector Excellence (APSE) Margo Blair Innovation Award, celebrating
outstanding local councils that use innovative ideas and solutions to tackle the
current challenges facing their frontline services. 
Page 43

Page 44

5. People Implications
5.1 There are no people implications from this report.
6. Financial and Procurement Implications
Financial
6.1 In March 2021 Council approved the Housing Capital Programme 2021-2026
which saw significant resources committed to the delivery of new council
homes in West Dunbartonshire.  An expenditure budget of £83.393m for the
affordable housing supply programme is factored into the HRA Capital
Programme.  The additionality in the costs highlighted for the Pappert
development can be met from this existing budget; however we would
anticipate additional grant funding would be made. As it currently stands, it is
anticipated that this programme will complete on project life budget.
6.2 Influenced by Brexit, the current Covid-19 pandemic and other issues, the
emergence of supply issues and subsequent cost increases has begun to be
felt within not only our existing and future sites, but sites across Scotland and
the UK.  Whilst the impact of these is still being examined, it is prudent to
mention this as early as possible in order to provide more detailed information
at a future Committee when new tender prices are known.
6.3 We are likely to see this impact on our future development sites including
Clydebank East. Housing Development Officers and Finance will continue to
assess the impacts in the context of affordability of developments.
Procurement
6.3 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted with 4.17 of this report will
continue to be prioritised.
6.4 Where the contract award is less than £50,000, authority is delegated to
the Chief Officer in consultation with the Procurement Manager to instruct the
award of contracts for the planned revenue and capital spend detailed in this
report to suppliers providing the most economically advantageous offer to the
Council.
6.5 Where the value of the contract is over £50,000, remittance for
approval will be submitted to the Tendering Committee.
Community Benefits
6.6 As part of each project, the contract has incorporated an element of
Community Benefits that can support a wide range of social, economic and
environmental benefits for communities including jobs, apprenticeships and
local charity and community initiatives. A summary of the community benefits
Page 44

Page 45

achieved through the first phase of the More Homes West Dunbartonshire
approach is outlined in the table below:-
Community Benefit Value Total
Work placement opportunities (16 plus years) – no.
individuals
30
Construction Curriculum support activities – no. individuals 16
Graduates - no. individuals 1
Apprenticeship starts  - no. individuals 17
Existing Apprenticeships - no. individuals 17
Apprenticeships completed - no. individuals 22
New jobs created on construction project - no. individuals 16
Community Engagement/Investment £83k
7. Risk Analysis
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis.
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel.
8. Equalities Impact Assessment (EIA)
8.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
9. Consultation
9.1 As part of our recent rent consultation exercise, 92% of respondents indicated
their support for the Council’s ambitious plans to deliver the Housing Revenue
Account (HRA) new council house build programme.  Regular updates on
new build development are provided to the West Dunbartonshire Tenants and
Residents Organisation at the bi-monthly liaison meetings. As detailed at 6.6
above, each project will have their own element of Community Benefits.  This
will provide opportunities for the community to become involved and
participate whether this is pupils at the local school or interested community
members.
10. Strategic Assessment
10.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
Page 45

Page 46

investment in housing and related services across West Dunbartonshire.
Having considered all the Council’s strategic priorities, this report and the
provision of new supply social housing for rent contributes greatly to all
strategic priorities. 
Peter Barry
Chief Officer, Housing and Employability
Date: 11 August 2022
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, telephone: 07793717981, email: john.kerr@west-
dunbarton.gov.uk
Appendices: None
Background Papers: West Dunbartonshire Council’s Local Housing Strategy
Local Housing Strategy, Health Inequalities Impact
Assessment
DVS Valuation Report Development Site:WDC Amenity
Land Main Street Bonhill West Dunbartonshire G83 9HS
Wards Affected: All
Page 46

Page 47

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 24 August 2022
___________________________________________________________________
Subject:   Scottish Social Housing Charter/Regulation of Social Housing in
Scotland Annual Update Report
1. Purpose
1.1 This purpose of this report is to provide the Housing and Communities
Committee with West Dunbartonshire Council’s annual progress report on
meeting the requirements of the Scottish Social Housing Charter.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the contents of this report recognising the ongoing impact the
Covid-19 pandemic has had on 2021/22 performance and the key areas
of focus for the Housing Improvement Board during 2022/23 outlined at
4.19 of this report; and
(ii) Agrees that a further progress report on the Scottish Social Housing
Charter be submitted to the November 2022 meeting of the Housing and
Communities Committee.  This report will include detailed benchmarking
performance information against all local authorities in Scotland
highlighting the impacts of the pandemic on housing and homelessness
services across Scotland.
3. Background
3.1 The Scottish Government’s first Social Housing Charter (SSHC) came into force in
April 2012 and this was reviewed during 2016.  A revised Charter was subsequently
approved by the Scottish Parliament and came into effect in April 2017.
3.2 The purpose of the SSHC is to help improve the quality and value of the
services that social landlords provide by:
• Stating clearly what tenants and other customers can expect from social
landlords and helping them to hold landlords to account;
• Focusing the efforts of social landlords on achieving outcomes that matter
to their customers; and
• Providing the basis for the Scottish Housing Regulator (SHR) to assess
and report on how well landlords are performing.
ITEM 9
Page 47

Page 48

3.3 A revised Regulatory Framework and reporting timetable for the SSHC came
into effect on 1st April 2019 is shown below:
When Who What
Throughout year
Housing
Development/Tenant
Representatives
Assess performance against the Charter
Outcomes
May each year Housing
Development
Submission of Annual Return on the Charter
(ARC) to Scottish Housing Regulator
August each year Scottish Housing
Regulator
Publishes a report about each social landlord
with key data from its ARC on their website
October each
year
Convener of
Housing and
Communities
Committee
Submission of Annual Assurance Statement
(AAS) to the Scottish Housing Regulator
October each
year
Housing
Development
Publication of annual Charter Performance
Report for tenants and other customers
by April each year
Scottish Housing
Regulator 
Publishes an Engagement Plan for each
landlord, highlighting areas where they are
seeking further assurance, based on
performance against Charter Indicators and
outcomes
by April each year Scottish Housing
Regulator 
SHR will publish a report on the analysis of the
sector’s performance in achieving the Charter
3.4 The main changes introduced as part of this revised framework were the 
introduction of an Annual Assurance Statement (AAS), which needs to be
submitted to the SHR by the end of October each year, and also the introduction
of an Engagement Plan published by the SHR for every social landlord, which
is based on information provided as part of our Annual Return on the Charter
(ARC) which measures performance against the Charter indicators and
outcomes.
3.5 On the 6 August 2014, Members of the Housing and Communities Committee
agreed that twice yearly reports be provided as follows:
• August Committee - Scottish Social Housing Charter Annual Update
Report; and
• November Committee - Scottish Social Housing Charter Annual
Benchmarking Report and Mid-Year Progress Report – (April-September).
4. Main Issues
4.1 The key areas of focus in relation to the SSHC are as follows:
• An assessment of our progress in relation to achieving the Charter
Outcomes;
• Production and publication of an Annual Charter Performance Report for
tenants and other customers;
• Submission of an AAS to the SHR;
Page 48

Page 49

• The development of effective tenant scrutiny arrangements in
conjunction with tenants and other customers; and
• The publication by the Regulator of an Engagement Plan for every social
landlord.
Assessment of Performance against the Charter Outcomes
Annual Return on the Charter (ARC) and Landlord Report
4.2 West Dunbartonshire Council has successfully submitted our ARC to the SHR
within the timescale outlined in the Regulatory Framework.  This process
included both internal and external validation processes.  The Housing
Service engaged with the Scottish Housing Network (SHN) in terms of a
robust external validation of our data.
4.3 The SHR uses these Charter Performance Indicators, alongside data relating
to homelessness submitted to the Scottish Government, to monitor the
delivery of housing and homelessness services of all social landlords against
the Charter outcomes and standards.  A copy of the full list of indicators can
be accessed via the link included as part of the background papers.
4.4 The SHR is due to publish a Landlord Report on their website for each
Scottish social housing landlord at the end of August 2022 and this report will
contain key data from the ARC (18 key indicators) and will compare our
performance with a Scottish average figure across all social housing landlords
operating in Scotland.
4.5 Performance in 2021/22 against those 18 key indicators and an additional 12
indicators that our tenants and customers have informed us are important to
them are outlined in the table below.
Table Key Index
Annual Target Achieved Positive Performance Trend
Annual Target Almost Achieved
(within agreed parameter)  Negative Performance Trend
Annual Target Not Achieved No change from previous year
Overall Satisfaction
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target Trend Target
met
% of tenants satisfied with the
overall service 78.5%* 78.5%* 78.5%
Communication
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target Trend Target
met
average time in working days to
respond in full to complaint - Stage 1 10.65 days 11.86 days 5 days
average time in working days to
respond in full to complaint - Stage 2 35.97 days 29.95 days 20 days
Page 49

Page 50

% of tenants who feel their landlord
is good at keeping them informed
about their services 
85.7%* 85.7%* 85.7%
Participation
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of tenants satisfied with the
opportunities given to participate in
decision making process
83.9%* 83.9%* 83.9%
Quality of Housing
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of stock meeting the Scottish
Housing Quality Standard (SHQS) 82.84% 18.17% 86.15%
% of existing tenants satisfied with
the quality of their home 76.54%* 76.54%* 76.54%
Repairs and maintenance
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
Average length of time taken to
complete emergency repairs  6.14 hours 5.81 hours 4 hours
Average length of time to complete
non-emergency repairs 6.76 days 10.16 days 7 days
% of reactive repairs carried out in
the last year Right First Time 89.76% 86.49% 90%
% of repairs appointments kept 94.87% 89.72% 93%
How many times in the reporting
year did you not meet your statutory
obligation to complete a gas safety
check within 12 months of a gas
appliance being fitted or last checked
215 0 0
% of tenants satisfied with the
repairs and maintenance service 80.50% 87.7% 84%
Estate management, Antisocial behaviour
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of Anti Social Behaviour cases
resolved within locally agreed targets 92.83% 98.08% 93%
% of tenants satisfied with the
landlord’s contribution to the
management of the neighbourhood
they live in.
78.53%* 78.53%* 78.53%
Access to housing
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of tenancy offers refused 46.61% 49.19% 42%
Tenancy sustainment
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of new tenancies sustained for
more than a year 91.55% 94.59% 92%
The average time to complete
medical adaptations
123.25
days
107.84
days 60 days
Page 50

Page 51

Homelessness
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
Incidences of homelessness in West
Dunbartonshire 1021 1203 1072
% of  homeless cases with decision
within 28 days of presentation 99.6% 99.6% 95%
% of all homeless cases re-assessed
within 12 months (repeat homeless) 5.4% 5.3% 5%
% of households requiring temporary
accommodation to whom an offer
was made
100% 100% 100%
% satisfied with the quality of
temporary accommodation 88.2% 86% 89%
Value for Money – Rent Collection
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
Rent collected as a % of total rent
due 98.88% 98.39% 98%
Gross rent arrears as a % of rent due 10.35% 9.24% 10.35%
% of tenants who feel that the rent
for their property represents good
value for money
77.05%* 77.05%* 77.05%
Value for Money – Void Management
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of rent due lost through properties
being empty 1.20% 1.29% 0.88%
Average length of time taken to re-
let properties 56.14 days  45.77 days 25 days
% of tenants satisfied with the
standard of their home moving in 79.65% 90.5% 87%
Gypsy Travellers
Indicator Description 2020/21
Value
2021/22
Value
2021/22
Target
Trend Target
met
% of Gypsy Travellers satisfied with
the landlords management of site 91.7% 91.7% 90%
*Value from Tenant Satisfaction Survey carried out in 2019/20, next survey is planned 2022/23.  Satisfaction
levels must be from within a 3 year period
4.6 Performance in 2021/22 continued to be affected by the impacts of the Covid-
19 pandemic. Throughout the year this significantly impacted on service
delivery and performance in areas such as repairs/maintenance, void
management, the completion of medical adaptations. Of the 30 key indicators
outlined above, 16 met the annual target set (the same as in 2020/21), with
another 5 narrowly missing this target. Overall this translates to 70% of these
key indicators either meeting or almost achieving target (up from 69% in
2020/21).
4.7 During 2021/22, the Housing Improvement Board (HIB) has monitored closely
key work-streams aimed at improving key areas of service delivery where
performance was not where we wished it to be:-
• rent collection/arrears;
Page 51

Page 52

• time taken to carry out medical adaptations;
• complaints response times.
The HIB also decided to monitor SHQS compliance and services for people
who are experiencing homelessness. Progress around these areas is outlined
below.
Rent Collection/Arrears
4.8 The target agreed with Revenues and Benefits for 2021/22 for maintaining the
level of rent arrears at 10.35% of the rent due was met, with arrears reducing
to 9.24% (prior to write-offs).
4.9 The target for collecting 98% of all rent due was also met, with 98.39% of all
rent due reported. Whilst benchmarking data is not yet available from the SHR
both these figures are likely to remain below the Scottish average figure. 
Time taken to carry out medical adaptations
4.10 Performance in 2021/22 continued to be affected by the previous restrictions
in activity due to Covid-19 and the backlog that this created.  Activity in terms
of carrying out medical adaptations has now resumed. The number of medical
adaptations completed increased from 119 in 2020/21, to 313 in 2021/22, with
the number of households waiting for adaptations to be completed reducing
from 134 at the end of 2020/21, to 49 at the end of 2021/22.
4.11 Completing a large number of legacy applications which had been on the list
for some time because of the impacts of the pandemic, affected the overall
average days taken to complete medical adaptations which was 107.84 days.
This remains above our target but was an improvement from 123.25 days in
2020/21. Both internal and external resources are being utilised to increase
completions and further improve performance during 2022/23.
Complaints response times
4.12 The average time taken to respond to Stage 1 complaints increased slightly
from 10.65 days to 11.86 days (against a 5 day target), though the average
time taken to respond to Stage 2 complaints reduced from 35.97 days to
29.95 days (against a 20 days target).
4.13 Whilst performance can be partly explained by the increased volume of
complaints received during the Covid-19 pandemic, there is scope for
improvement in this area. The Tenant Scrutiny Panel’s last exercise looked at
this area and made a number of recommendations which are now being
implemented and we would hope to see significant improvement in this area.
SHQS compliance
4.14  This year has seen an increase in our SHQS failures. The key contributing
factor is due to the new requirement around Electrical Installation Condition
Reports (EICRs) programme not being completed as planned by the end of
March 2022. The programme has been delayed due to the Covid-19
Page 52

Page 53

restrictions and the wider consequences of these impacting on internal and
external resource availability to deliver the programme as planned.
4.15 While we have since secured additional resource to deliver the programme as
early as possible this did not significantly reduce SHQS failures before 31st
March 2022. To ensure the programme continues to accelerate all our
housing stock to full compliance in terms of EICRs we are undertaking
proactive communications with tenants to maximise access to complete the
required inspection reports. 
Services for people experiencing homelessness
4.16 During 2021/22 we spoke to the SHR to provide further information and
assurance around our homelessness services. There has been a 14%
increase in homeless presentations during 2021/22 with a total of 1203
presentations compared to 1053 in 2020/21. The main reasons for the
increase in presentations have been as a result of relationship breakdown,
inclusive of a significant increase in presentations as a result of domestic
abuse. A significant increase in approaches to the Housing Options Service
for assistance has also contributed to the rise in applications. 
4.17 Despite a significant increase in presentations, performance around key
indicators remains excellent with 99.6% of all homeless applications being
assessed within 28 day target time (this equates to only 5 cases not being
assessed within target during 2021/22, these were all complex cases involving
other public agencies) and instances of repeat homelessness remaining
relatively low at 5.3% (this represents 54 repeat cases in the year. Analysis of
all repeat cases of homelessness is carried out on an ongoing basis and key
drivers are when an applicant has lost contact with the service and then re-
presents or when there has been a relationship breakdown and further
assistance is required).
4.18 The rise in applications and slowing down of letting activity will impact on the
number of homeless households requiring to be rehoused and on the length
of time spent in temporary accommodation and the progress we are making in
terms of delivering the outcomes outlined in our Rapid Rehousing Transition
Plan (RRTP) is being provided in a separate report to the August 2022
Housing and Communities Committee.
Key areas of focus for the HIB during 2022/23
4.19 At the meeting of the HIB on 30 May 2022, annual performance was
discussed and it was agreed that in addition to quarterly performance reports
covering the whole service, the HIB would monitor key work-streams aimed at
driving improvements and monitoring closely the following areas:
• SHQS compliance;
• Void management;
• Services for people who are homeless;
• Rent collection/arrears; and
Page 53

Page 54

• Complaints response times.
4.20 A comprehensive assessment of performance against the Charter Outcomes
has been undertaken and informs a series of actions aimed at recovery and to
drive continued improvement. This wider Charter Improvement Plan was
approved at the July 2022 meeting of the HIB.
4.21 Annual benchmarking data is due to be published by the SHR by the end of August
2022 and the HIB will review annual targets for 2022/23 which challenge the
housing and homelessness service to meet their ambition to be one of Scotland’s
top performing landlord organisations.
Production and publication of Annual Charter Performance Report
4.22 The SHR requires all social landlords to produce an Annual Charter Performance
Report for their tenants and other customers no later than 31 October each year.
4.23 The Regulator states that it should include:
• An assessment of performance in delivering the Charter Outcomes;
• Relevant comparisons – with previous years, other landlords and national
performance; and
• How and when the landlord intends to address areas for improvement.
4.24 In preparation for our first report in 2014, a working group of tenants and
officers was established and successfully:
• Agreed how tenants wished to be involved;
• Agreed which indicators will feature in the report; and
• Agreed the best style and format to ensure that the report is user friendly
and easy to understand.
4.25 Further engagement was carried out with tenant representatives during
August and September 2020 to review and update this report, in line with the
revised Charter coming into effect.  This consultation influenced the style,
content and format of our Annual Charter Performance Report and also the
update of the Service Standards that are in place across housing services and
which are reported regularly to tenants and other service users (via website
and insert with Housing News).
4.26 The narrative in the report is based on the annual self-assessment exercise of
our performance and the report will be published online, with a summary being
sent to every tenant with the winter edition of the Housing News. The full report
will be sent to tenants groups and interested tenants, partner organisations and
elected members.
Page 54

Page 55

Annual Assurance Statement (AAS)
4.27 The AAS requires landlords to state they are meeting regulatory requirements
and that they are compliant with the relevant regulatory standards, legal
requirements and statutory guidance relevant to the sector.
4.28 We are carrying out a process of reviewing and updating our AAS which takes
account of the risks posed by, and impacts of the Covid-19 pandemic. As
outlined in the SHR guidance, it will be a short, succinct document, in a simple
format and will highlight any areas of non-compliance and actions being taken
to address these.
4.29 The central aspect of the AAS is that the Committee has been provided with
the necessary assurance in terms of information and evidence where
required, to support the content of the AAS.
4.30 A wide range of arrangements are in place to ensure that we meet our
regulatory and statutory obligations and to provide members of the Committee
with the assurance required.
4.31 An information session will be planned for September 2022 for the Housing
and Communities Convener and Vice Convenor, to provide an overview of the
Regulatory Framework, with detail around how they can be assured that we
have properly assessed and can evidence compliance with our regulatory and
statutory obligations and to highlight any areas of non-compliance being
reported.
4.32 The AAS will be signed by the Convenor of the Committee and submitted to
the SHR as per the regulatory requirement. As per the SHR guidance, the
AAS will then be published to ensure that it is accessible to tenants and other
customers.
Tenant Scrutiny Arrangements
4.33 The statutory regulatory framework for housing and homelessness services
demands that tenants are involved in scrutinising landlords’ performance
against the Charter and requires that:
• The form of involvement has been agreed with tenants;
• Involvement is effective and meaningful and that tenants have a real say
in assessment of performance;
• The approach is publicised to tenants; and
• Landlords’ can demonstrate the agreed approach was actually implemented.
4.34 Developing effective tenant scrutiny is therefore a challenging process,
however following support from the Scottish Government’s “Stepping Up to
Scrutiny” training programme in which elected members took part, these 
requirements were successfully met and in November 2014 the Housing and 
Communities Committee approved the establishment of our Tenant Scrutiny
Panel  with clear terms of reference.
Page 55

Page 56

4.35 The Scrutiny Panel has subsequently carried out the following scrutiny exercises:
• 2014/15 looking at our Anti-Social Behaviour Service;
• 2015/16 looking at our Repairs Service;
• 2016/17 looking at tenancy sustainment, specifically the new tenant visit
process;
• 2017/18 looking at SHQS compliance, specifically the number and
reasons that properties that are held in abeyance;
• 2018/19 looking at the timescales taken to complete medical adaptations;
and
• 2020/21 look at the complaints process and time taken to respond to
complaints.
4.36 All of the recommendations made in the Panel’s first 6 reports were approved
by the HIB and progress in terms of implementing these are a standing
agenda item at the monthly meetings of the HIB.
4.37 Following our 2021/22 ARC submission the Scrutiny Panel have been briefed
in terms of our latest performance information and Charter Improvement Plan
and will use this information to agree the focus their activity during 2022/23.
4.38 The WDTRO continue to be heavily involved in the scrutiny of the Housing
Service and the formation of the Joint Rent Group comprising of tenants,
Council officers and the Convener of the Housing and Communities
Committee, looking at the rent setting process and the guidance in relation to
the Housing Revenue Account (HRA) is a further mechanism in ensuring the
Housing Service provides best value for current and future tenants.
Engagement Plan
4.39 The SHR continues to operate a risk based approach to inform its engagement
with social landlords. As part of the Regulatory Framework the Regulator now
publishes an Engagement Plan for all landlords based on our ARC submission
and our homelessness submissions to the Scottish Government.
4.40 Our most recent Engagement Plan published on 31 March 2022 states that
the SHR will engage with the Council about our services for people who are
homeless and also engage with the Council in relation to tenant satisfaction,
complaints handling and rent arrears.
4.41 The high social and political focus on homelessness within Scotland,
alongside the impact of the Covid-19 pandemic, has resulted in all of Scottish
local authorities being required to provide further information in relation to
services to homeless people.
4.42 The other areas identified were based on a review and comparison of 2020/21
performance information of all social landlords to identify the weakest
Page 56

Page 57

performing landlords. A copy of our current Engagement Plan is available on
our website and also the Scottish Housing Regulators website.
5. People Implications
5.1 None.
6. Financial and Procurement Implications
6.1 There are no direct financial or procurement implications in relation to this report.
The improvement plan developed from the Charter self-assessment exercise will
be delivered from within existing budgets. These are detailed in the Resources
section of the Housing and Employability Delivery Plan being submitted to the
Housing and Communities Committee in August 2022.
7. Risk Analysis
7.1 There is a risk that failure to respond appropriately to the requirements of the
Scottish Social Housing Charter would attract an adverse reaction from the
Scottish Housing Regulator and may have wider consequences for the
Council in the context of Best Value.
7.2 At the time of writing we expect out next Engagement Plan to be published in
March 2023.
8. Equalities Impact Assessment (EIA)
8.1 Equalities legislation requires that new or significantly changing policies or
services and financial decisions should be subject to an assessment of their
impact on the wellbeing of certain groups of people. The recommendations
within this report do not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
9. Consultation
9.1 The Council has in place a well-established and proactive tenants and
residents organisational structure.  The WDTRO meet with the Council (co-
chaired by the Convener of the Housing and Communities Committee) on a
bi-monthly basis to discuss all issues relating to the Housing Service.
9.2 There remains a strong appetite among tenants and customers to continue to
participate actively to improve housing services in West Dunbartonshire.  This
is reflected in the successful partnership approach adopted to develop the
Charter Performance Report and the on-going activities of the WDTRO and
the West Dunbartonshire Scrutiny Panel.
9.3 The Council is committed to ensure consultation continues and will support
arrangements to increase tenant scrutiny activities and assess our
performance in line with the requirements under the Scottish Social Housing
Charter and the new regulatory framework introduced by the Scottish Housing
Regulator.  Our approach was again commended via an external validation
exercise by TPAS (Tenant Participation Advisory Service) Scotland which
Page 57

Page 58

awarded West Dunbartonshire Council, a Gold Accreditation for excellence in
tenant participation (the highest available).
10. Strategic Assessment
10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all five strategic priorities and specifically to improve local
housing and environmentally sustainable infrastructure.
Peter Barry
Chief Officer, Housing & Employability
Date: 9 August 2022
___________________________________________________________________
Person to Contact:   John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability, telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk 
Appendices: None
Background Papers:  West Dunbartonshire Council, Annual Assurance
Statement 2020/21, October 2021
West Dunbartonshire Council | Scottish Housing Regulator
AAS Assessment of compliance toolkit 2021, West
Dunbartonshire Council, October 2021
West Dunbartonshire Council’s Engagement Plan, Scottish
Housing Regulator, 31 March 2021
Engagement plan from 31 March 2022 to 31 March 2023 |
Scottish Housing Regulator
The Scottish Social Housing Charter: Indicators and
Context Information, Scottish Housing Regulator         
https://www.housingregulator.gov.scot/landlord-
performance/national-reports/national-reports-on-the-
scottish-social-housing-charter/about-the-scottish-social-
housing-charter 
Scottish Housing Regulator, Landlord Report 2020/21 West
Dunbartonshire Council
Landlord Report | West Dunbartonshire Council (west-
dunbarton.gov.uk)
Annual Charter Performance Report for Tenants and    
other Customers 2020/21, West Dunbartonshire Council,
October 2021
Charter Performance Report | West Dunbartonshire Council
(west-dunbarton.gov.uk)
Page 58

Page 59

West Dunbartonshire Council Scottish Social Housing Charter
Self-Assessment Improvement Plan
West Dunbartonshire Tenant Participation Strategy 2021-2024
“Involving You”
Scottish Social Housing Charter/Regulation of Social Housing
in Scotland \progress Report,
Report by Executive Director of Infrastructure and
Regeneration, Housing and Communities Committee, 
3 November 2021
West Dunbartonshire Scrutiny Panel, Report to the Housing
Improvement Board October 2021, Scrutiny Exercise:
Complaints handling
West Dunbartonshire Scrutiny Panel, Report to the Housing
Improvement Board October 2020, Scrutiny Exercise: Medical
adaptations
West Dunbartonshire Scrutiny Panel, Report to the Housing
Improvement Board March 2018, Scrutiny Exercise: SHQS,
properties held in abeyance
West Dunbartonshire Scrutiny Panel, Report to the Housing
Improvement Board October 2017, Scrutiny Exercise:
Tenancy Sustainment, New Tenant Visits
West Dunbartonshire Scrutiny Panel, Report to the Housing
Improvement Board June 2016, Scrutiny Exercise: Repairs
and Maintenance
West Dunbartonshire Scrutiny Panel, Report to the Housing
Management Team March 2015, Scrutiny Exercise: Anti-
social behaviour
Wards Affected:  All      
Page 59

Page 60

Page 60

Page 61

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 24 August 2022
___________________________________________________________________
Subject:     “Home at the Heart 2019-24” West Dunbartonshire’s Rapid Re-
housing Transition Plan update and new approaches to
homelessness progress report
1. Purpose
1.1 The purpose of this report is to provide members with an update on “Home at the
Heart” our Rapid Re-housing Transition Plan (RRTP) for the period 2019-24 and
new approaches to homelessness.
2. Recommendations
2.1  It is recommended that the Housing and Communities Committee:
(i) Note the progress made in the first three years of “Home at the Heart”,
which has informed an update report submitted to the Scottish
Government at the end of June 2022 and note the main objectives for
Year 4 attached as Appendix 1;
(ii) Approve that our Year 3 underspend outlined at 4.11 is used to meet the
objectives of the West Dunbartonshire Rapid Rehousing Transition Plan,
together with the Year 4 funding allocated by the Scottish Government;
(iii) Approve our spend and activity template of our Rapid Rehousing
Transition Plan attached as Appendix 2 to this report;
(iv) Note the uncertainty around future funding and specifically the risk to our
Housing First approach;
(v) Note that an annual update and progress report will be provided to the
Housing and Communities Committee in May 2023.
3. Background
3.1 Our current approach to tackling homelessness is outlined in our RRTP “Home
at the Heart”. This approach builds on the good progress made within West
Dunbartonshire by previous strategies, most recently our “More than a Roof”
approach which covered the period 2017/2020.  It reinforces the challenges set
by the renewed commitment to tackle homelessness to end rough sleeping and
to transform temporary accommodation.
3.2 “Home at the Heart” was developed in response to a key recommendation
from the Homelessness and Rough Sleeping Action Group (HARSAG) that
was adopted by the Scottish Government, for Local Authorities to develop and
submit a RRTP for the period 2019-24.
ITEM 10
Page 61

Page 62

3.3 It was developed in partnership with key stakeholders, including the West
Dunbartonshire Health and Social Care Partnership and the West
Dunbartonshire Housing Solutions Partnership, which includes local
Registered Social Landlords and was submitted to the Scottish Government on
31 December 2018 and approved by the Housing and Communities
Committee on 6 February 2019.
3.4 Regular reports have been provided to the Housing and Communities
Committee, initially detailing and seeking approval for our RRTP and
subsequently providing updates in terms of progress being made and
approving the use of Scottish Government funding in order to deliver our key
objectives.
4. Main Issues
4.1 The aims of “Home at the Heart” in terms of tackling homelessness are
influenced by the Scottish Social Housing Charter and consistent with the
Scottish Government’s “Ending Homelessness Together” approach and are
structured around the following 4 strategic objectives:
• Deliver a whole systems approach to the prevention of homelessness;
• Enable service users with low or no support needs to access settled
housing quickly;
• Develop interim housing options which enable independent living and
tenancy sustainment; and
• Implement a Housing First model which enables the most excluded service
users to achieve housing sustainment.
4.2 The feedback received from the Scottish Government in relation to our RRTP
has been positive and highlighted a number of areas of good practice
including:
• The comprehensive temporary accommodation modelling undertaken as
part of our wider “More than a Roof” approach;
• The strategic approach to tackling homelessness;
• The introduction of the supported tenancy model;
• Prioritising and scaling up of Housing First;
• Our award winning Leaving Care Housing Protocol; and
• The fact that we have never breached the unsuitable accommodation order.
Page 62

Page 63

“Home at the Heart” Year 3 progress
4.3 Objective 1: Deliver a whole systems approach to the prevention of
homelessness:
• FTE staff member to provide an enhanced proactive homeless prevention
role now permanent part of the service;
• Pilot Prevention Fund received over a 100 referrals in 2021/22 with 22
receiving payments from the fund which has helped households at risk of
homelessness remain in their social or private tenancies;
• Tenant Hardship Fund was fully utilised;
➢ 239 grant awards have been made totalling £263,000;
➢ 133 awards were made to RSL tenants totalling £123,718, an
average of £930 per case;
➢ 102 awards were made to WDC tenants totalling £131,003, an
average of £1284 per case;
➢ 4 awards were made to tenants in private lets totalling £8760,
• Our prevention initiatives have led to a 68% increase in approaches being
dealt with by our Housing Options Service during 2021/22, with over half of
these resulting in homelessness being prevented;
• Review of our Housing Allocation policy, it was agreed to create an
additional reasonable preference group for young people at risk of
homelessness and that a certain proportion of available properties should
be allocated to this group.
4.4 Objective 2: Enable service users with low or no support needs to access
settled housing quickly:
• Reviewed and updated the lettings targets for homeless households with
all social landlords across West Dunbartonshire, however letting activity
remained lower than expected;
Calculation of homeless lets required and % of expected
letting activity required to meet need - split by LA & RSL 
Year 3
target  Year 3 actual
Lets required to meet demand 867 733
Split LA 567 515
Split RSL 300 218
% Allocation of lets required
LA 56% 57%
RSL 55% 46%
We continued to deliver a quick and efficient assessment process to help
meet our targets;
Page 63

Page 64

• Despite the impacts of Covid-19 and subsequent lockdowns and
restrictions, 592 homeless households with no/low support needs were
rehoused and were supported to move into settled accommodation;
• The average length of time these households spent in temporary
accommodation was 17 weeks.
4.5 Objective 3: Develop interim housing options which enable independent living
and tenancy sustainment:
• Continue to monitor the following protocols; Prison Discharge, Leaving
Care, and Hospital Discharge
• Reviewed our “No Home for Domestic Abuse” approach, to ensure that
victims are supported to pursue their most appropriate housing option;
• Continue to offer a Conversion Programme to provide settled
accommodation for more homeless households, 45 in Year 3 which was 15
above our indicative target;
• Supported Accommodation Initial Review completed with a committee
agreeing to FTE to take forward the recommendations to provide the new
required provision.
4.6 Objective 4: Implement a Housing First model which enables the most
excluded service users to achieve housing sustainment:
• We have recruited and trained a dedicated Housing First Support Team,
ended Year 3 with 8 Housing First support workers;
• Fully assessed 51 Housing First referrals jointly with clients, with 23 being
suitable and agreeing to participating in the Housing First approach;
• Created 28 new Housing First tenancies, in addition to the 20 created in
Year 1 and 2;
• Our Housing First approach has a tenancy sustainment rate of 94%, with
the only tenancies ending sadly being due to the deaths of the tenants.
• We have also had 3 tenancies “stepped down” term used by the Scottish
Government to describe with all parties agree the housing first client no
longer requires support due to positive progress made.
4.7 With the protections that the Scottish Government had created for most
renters during lockdown to help prevent evictions from taking place ending in
September 2021.  The number of section 11 notices have started to see a
significant increase particularly since the start of 2022 and will continue to
rise. 
4.8 The impact of the pandemic continued to have an impact on letting activity
across West Dunbartonshire in Year 3 (see table in 4.4).  Within West
Dunbartonshire Council we are still seeing lower than normal voids being
returned ready for let.
Page 64

Page 65

4.9 A key consequence is an increase in the overall number of homeless
households in temporary accommodation and an overall increase in the
average time spent in temporary accommodation.    
4.10 At the time of writing in early July 2022, we had 72 households who had spent
over a year in temporary accommodation an increase from 53 in August 2021.
Most of these have complex need and we are actively working with these
households providing high levels of support and are focused on securing long
term housing solutions so that every household has safe and secure
accommodation.
4.11 These have then contributed to a Year 3 underspend in our RRTP less an
over spend of conversions as outlined in the table below, however as
highlighted later in this report the underspend for Year 3 will be utilised to
deliver Year 4 RRTP ambitions:
RRTP Year 3 spend Year 3 plan Year 3 spend Year 3
underspend
Housing First West Dunbartonshire £480,657 £417,000 £63,657
Interim Supported Tenancies £31,200 £31,200 £0
Additional Resettlement Support Service £38,500 £38,500 £0
Enhanced Prevention Service £38,500 £38,500 £0
Pilot Prevention Fund £16,633 £8,350 £8,283
Shared Living Initiative £28,810 £28,810 £0
Review of Residential Supported
Accommodation
£18,000 £16,048 £1,952
Conversion Programme £75,000 £112,500 - £37,500
Year 3 totals £727,630 £690,908 £36,392
Review and update of “Home at the Heart”
4.12 All local authorities were asked to provide the Scottish Government with a
written report outlining how they had spent their allocation of Year 3 funding
and progress to date.  
4.13 West Dunbartonshire Council submitted this report in June 2022 and we have
taken this opportunity to fully review and update our existing RRTP to take
account of the progress made in the first three years, the homelessness context
within West Dunbartonshire, the impacts of the remains of the pandemic and
cost of living crisis and the following funding that is available for Year 4:
RRTP Year 4 funding
Year 3 underspend £36,392
SG funding for Year 4 £238,000
Housing and Homelessness contribution £200,000
Year 4 total funding £474,392
4.14 Our fully updated plan is attached as Appendix 1. We have now managed to
mainstream most of the initiatives and enhanced service provision
introduced as part of our Rapid Rehousing Transition Plan. This means that
the £238k funding received from the Scottish Government, along with any
Page 65

Page 66

underspend from the previous year, can now be used to fund Housing First
in West Dunbartonshire.
Whilst this funding will allow us to scale up Housing First, it will not be to a
level that fully meets identified demand and the service will need to operate
with a targeted capacity.
RRTP Year 4 costings
Housing First West Dunbartonshire £391,109
Pilot Prevention Fund £8,283
Conversion Programme £75,000
Year 4 total cost £474,392
RRTP Year 4 main objectives
4.15 Objective 1: Deliver a whole systems approach to the prevention of
homelessness:
• The implementation of our revised allocations policy and close monitoring
of impact on youth homelessness;
• Recruitment of an additional resettlement officer to ensure that those
young people housed via this route get appropriate support to move into
and sustain their tenancy;
• We will continue to monitor the impact of the pilot prevention fund and
consider options to identify and provide longer term funding;
• Our Enhanced Prevention Service will become more community focussed
and interventions will include an increase in home visits.
4.16 Objective 2: Enable service users with low or no support needs to access
settled housing quickly:
• Reduce time in temporary accommodation for those with no or low
support needs down to 15 weeks by end of Year 4;
• We have updated our modelling and asked all social landlords to agree to
69% of all lets to households experiencing homelessness;
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL 
Year 4
Lets required for to meet demand 986
Split LA 641
Split RSL 345
Projected turnover  Year 4
Split LA 929
Split RSL 500
% Allocation of lets required  Year 4
LA 69%
RSL 69%
Page 66

Page 67

• This was based on an expected 1150 demand for homelessness during
2022/23.
4.17 Objective 3: Develop interim housing options which enable independent living
and tenancy sustainment:
• Recruit the Senior Housing Development Officer to take forward the
recommendations of the full review of our provision of temporary and
supported accommodation as agreed by the Housing and Communities
Committee in February 2022;
• Senior Supported Accommodation worker post now mainstreamed to
continue to deploy the resources to additional support required with higher
numbers of temporary ongoing since the pandemic due to lower letting
activity;
• Implement our Year 4 Conversion Programme to provide settled
accommodation for more homeless households.
4.18 Objective 4: Implement a Housing First model which enables the most
excluded service users to achieve housing sustainment:
• We have continued with 8 FTE HF Support Workers and removed the
planned increase that would be needed for fully meet identified demand;
• Following feedback from the Housing First Pathfinder and other networking
opportunities we have reduced the HF tenancy set-up costs from £2500 to
£1500;
• Due to available funding we have replaced the annual Housing First
tenancy sustainment budget of £1000 per HF tenancy, with a Diversionary
Activities Budget of £18,000 to cover all HF clients.
4.19 Short-term financial uncertainty remains in terms of our RRTP as at present
Scottish Government funding only covers a 2 year period 2022/23 – 2023/24,
the remainder of the period of our RRTP. Our Year 4 funding allocation of
£238,000 is expected to be the same in Year 5 with no current funding
commitment beyond year 5.
4.20 Despite taking actions to mainstream some elements of our transition plan
within our wider service provision, future sustainable funding for Housing First
remains a key challenge.  With current funding from the Scottish Government
and Housing only sustaining the service until 2023/24 but not being able to
expand to meet demand.
4.21 Whilst we continue to explore long term funding options to continue our
Housing First support service, we are aware of some national discussions
through colleagues within COSLA looking at reviewing funding to deliver
homelessness and housing option services which would include future funding
to deliver the RRTP outcomes.
Page 67

Page 68

4.22 Recent report from Drug Death Task Force to the Scottish Government notes
one of the Actions (no 26) for funding to continue and expand housing first
(https://drugdeathstaskforce.scot/news-information/publications/reports/final-
report/). 
4.23 Regular progress reports will be provided to the Council’s Housing and
Communities Committee, the Health and Social Care Partnership Board and
the Housing Solutions Partnership, chaired by the Convenor of the Housing
and Communities Committee.
New approaches to homelessness and impacts of Covid-19
HARSAG2
4.24 Due to the risks posed by the Covid-19 the Scottish Government assessed
that the national plan to end homelessness needed to be looked at again and
in June 2020 the Housing Minister asked the Housing and Rough Sleeping
Action Group (HARSAG) to reconvene and look at what more can be done to
tackle homelessness.
4.25 The Scottish Government agreed in principle to all the 105 recommendations
HARSAG made and subsequently published an updated Ending
Homelessness Together Action Plan on 8 October 2020.
4.26 The Scottish Government’s Homelessness Prevention and Strategy Group will
oversee the implementation of this plan. Whilst some of the key
recommendations are directed towards Scottish Government future policy,
some recommendations, such as those around benefits and support for
people regardless of their immigration status, are requests of the UK
Government. 
4.27 In addition, many of the recommendations will require to be delivered by each
individual local authority. Work has been on-going to develop and implement an
action plan in response to these recommendations and the current version of our
“HARSAG2 recommendations tracker” is available as a background paper to this
report.
4.28 We can update the following of the 105 actions;
Action Stage Number of Actions
Actions completed by WDC 73
Actions in progress by WDC 1
Actions not started by WDC 0
Actions requiring Scottish Government action with possible WDC
action
31
TOTAL 105
Local Connection
4.29 The policy intention of suspending local connection referrals between
Scottish local authorities is to remove barriers to support for people who
are homelessness or rough sleeping so they can resettle successfully, and
avoid repeat homelessness. If people are living in an area of their
Page 68

Page 69

choosing, they are more likely to integrate successfully into a local
community and access the services and support they require.
4.30 The pandemic has delayed this legislation and was due to be laid during
this session of parliament however there are no further timings as the
impact of the Ukrainian Refugee resettlement programme also being
considered. The Scottish Government will monitor the impact of these
changes and respond to any local authorities that report undue pressure
on service provision.
Public Sector duty to prevent homelessness
4.31 Another proposal from HARSAG being taken forward by the Scottish
Government is to look at developing legislation focussed at introducing a
Public Sector duty to prevent homelessness.
4.32 The Scotland Prevention Review Group was convened and has worked with
public bodies, housing providers and other partners to develop proposals for a
new duty on public bodies and delivery partners aimed at the prevention of
homelessness.
4.33 This work was initially due to be completed in the Summer of 2020 though
was delayed by the Covid-19 pandemic. A report was published in February
2021 with a series of recommendations around actions that could be taken to
prevent homelessness and that these should start up to six months before
someone faces losing their home.
4.34 The Scottish Government has committed to consider these proposals and to
work with local authorities over the coming months to seek further input to carry
out further consultation with partners.  We await discussion on and the
introduction of guidance.
4.35 The Scottish Government carried had a consultation open until end of March
2022 for all services to respond on the proposals.  West Dunbartonshire Council
responded to the consultation and encouraged partners to do the same but we
are awaiting outcomes from the consultation.
5. People Implications
5.1 There are no additional people implications in this report.
6. Financial and Procurement Implications
6.1 The Cabinet Secretary for Social Justice, Housing and Local Government
wrote to West Dunbartonshire on 20 December 2021 advising of the Council’s
Rapid Rehousing Transition Plan funding allocation for 2022/23 and 2023/24
of £238k.
6.2 The delivery of the wider Rapid Rehousing Transition Plan will be from within
existing budgets noting the Scottish Government funding for 2022/23, the
contribution from Housing and utilising the underspend from Year 3.
Page 69

Page 70

6.3 There is further financial uncertainty as at present Scottish Government funding
as funding covers the last 2 years of the RRTP. There is also an expectation
that Housing First becomes a permanent part of all Homeless services
however, there is no committed further funding past 2023/24 to cover part of the
costs and therefore to continue to provide the service and expand to meet
demand requires long term funding.
6.4 There are no procurement implications in terms of this report,
7. Risk Analysis
7.1 There are financial and regulatory risks associated with not being able to fully
deliver our Rapid Rehousing Transition Plan, including the Housing First
element of the approach.
7.2 The decision to award funding in Year 4 and 5 again was based again on a
formula which focuses on homelessness assessments (and not the content of
the RRTP’s), arguably benefits larger local authorities who receive a higher
proportion of homeless assessments and could discourage local authorities
from implementing initiatives aimed at preventing homelessness.
7.3 There is no confirmation of funding for RRTP past Year 5 therefore long term
funding is required to be sourced to continue with the transformation and
continuing our Housing First service.
8. Equalities Impact Assessment (EIA)
8.1 There are no negative equalities impacts due to this update to our RRTP
however preventing and responding to homelessness has a significant
positive impact on individuals and communities.  The aim of the policy is to
create positive impacts to all homeless households, but it is recognised that to
do this equality considerations must be taken into account to meet different
needs and circumstances. Section 2 of EIA 511, details potential positive
impacts for a number of groups and actions to support. No negative impacts
have been identified.
9. Consultation
9.1 The first draft of our RRTP was developed in collaboration with key partners,
including the Health and Social Care Partnership, local Registered Social
Landlords and third sector organisations, via a series of well attended
stakeholder events held in November and December 2018.
9.2 Consultation and communication have continued since the submission of the
first iteration of the RRTP through the Housing Solutions Partnership.  Further
engagement has also taken place with other local landlords via the Strategic
Housing Providers Forum, engagement has continued with the Health and
Social Care Partnership and also a dialogue with the WDTRO regarding the
implementation of the RRTP and Housing First has also taken place.
10. Strategic Assessment
Page 70

Page 71

10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities.
Peter Barry
Chief Officer, Housing and Employability
Date: 9 August 2022
___________________________________________________________________
Person to Contact:  John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability:  telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk 
Appendices: 1: WDC RRTP Year 2 update; June 2022
2: RRTP monitoring report, activity and funding; June 2022
Background Papers: RRTP Equalities Impact Assessment
RRTP Delivery Action Plan – June 2022
Ending Homelessness Together updated action plan;
Scottish Government October 2020
https://www.gov.scot/publications/ending-homelessness-
together-updated-action-plan-october-2020/ 
West Dunbartonshire Council’s Revised Rapid Rehousing
Transition Plan including Action Plan and Equalities Impact
Assessment, Home at the Heart 
Housing and Communities Committee Report 7th
November 2018 “Rapid Rehousing Transition Paper
position paper” 
Housing and Communities Committee Report 6th February
2019 “Rapid Rehousing Transition Plan 2019/20 to
2023/24””
Housing and Communities Committee Report 14th August
2019 “Rapid Rehousing Transition Paper 219-24 update
report”
Housing and Communities Committee Report 5th February
2020 “Rapid Rehousing Transition Plan and new
approaches to homeless update”
Housing and Communities Committee Report 2nd
September 2020 “New approaches to homelessness
update report – “More than a Roof 2017-20” final report and
“Home at the Heart 2019-24” Year 1 update on our Rapid
Re-housing Transition Plan”
Page 71

Page 72

Housing and Communities Committee Report 3rd February
2021 “Rapid Re-housing Transition Plan and new
approaches to homelessness update report”
HARSAG2 recommendations tracker, West Dunbartonshire
Council Housing Development and Homelessness Team,
June 2021
Housing and Communities Committee Report 2nd February
2022 “Rapid Re-housing Transition Plan and new
approaches to homelessness update report”
Letter from Kevin Stewart, MSP, Minister for Local
Government, Housing and Planning on Distribution of
Funding for Rapid Rehousing Transition Plans for 2021/2;
10 December 2020
Letter from Kevin Stewart, MSP, Minister for Local
Government, Housing and Planning on Additional Funding
for Rapid Rehousing Transition Plans for 2020/1; 18
December 2020 
Letter from Shona Robson, MSP, Cabinet Secretary for
Social Justice, Housing and Local Government on
Distribution of Funding for Rapid Rehousing Transition
Plans for 2022/3 and 2023/24; 20 December 2021
Wards Affected:   All 
Page 72

Page 73

Home at the Heart
West Dunbartonshire Council’s
Rapid Rehousing Transition Plan
2019/20 to 2023/24
Year 3 update and Year 4 plan
June 2022
ITEM 10
APPENDIX 1
Page 73

Page 74

1 
Home at the Heart – West Dunbartonshire Council’s Rapid Rehousing
Transition Plan 
Contents 
Rapid Rehousing Transition Plan Executive Summary .................................. 2 
Section 1 Context .................................................................................. 3 
Section 2 Key objective updates ........................................................... 7 
Section 3 Resource plan ..................................................................... 18 
Appendix 1 Gendered Analysis of Homelessness ................................. 19 
Page 74

Page 75

2 
Executive Summary 
“Home at the Heart” is West Dunbartonshire Council’s first Rapid Rehousing Transition
Plan for the period 2019/20-2023/24. The plan was developed in partnership with key
stakeholders including the West Dunbartonshire Health and Social Care Partnership and
all Registered Social Landlords operating in West Dunbartonshire. 
The plan highlights the good progress that has been made across West Dunbartonshire
in recent years through the implementation of our homelessness strategic approach
‘More Than a Roof’.  The plan also confirms that rough sleeping is not a widespread issue
within West Dunbartonshire and that the rehousing outcomes being achieved for
homeless households are largely positive. 
However, challenges exist, with the levels of overall homelessness and youth
homelessness remaining among the highest in the country, the proportion of homeless
households with multiple and complex needs remains high and the number of
households that lose contact or do not secure a settled housing outcome is a cause for
concern. 
Our plan acknowledges the challenges faced in terms of developing appropriate
Accommodation and Support Pathways which work for homeless households and has
the following four key outcomes: 
• Deliver  a Whole Systems approach to the prevention of homelessness;
• Enable service users with low or no support needs to access settled housing quickly;
• To develop interim housing options which enable independent living and housing
sustainment; and
• Implement a Housing First model which enables the most excluded service users
to achieve housing sustainment. 
Page 75

Page 76

3 
Section 1 - Context 
Homelessness context in West Dunbartonshire 
Our current approach to homelessness outlined in our Rapid Rehousing Transition Plan
is being implemented within the context of previous successful homelessness
strategies which have resulted in incidences of homelessness in West Dunbartonshire
reduce significantly in recent years. 
Homelessness in West Dunbartonshire
Homelessness Strategy 2008/13 2008/09 2012/13 Reduction
Homeless applications 2140 1364 36%
Homelessness Strategy 2013/16 2013/14 2015/16 Reduction
Homeless applications 1368 1124 18%
Homelessness Strategy 2017/20 2017/18 2019/20 Reduction
Homeless applications 1048 1022 2.6% 
Current homelessness position 
Following a slight increase of 3% in homeless applications last year, this year there has
been a further increase of 14%, with presentations rising from 1053 to 1203. The
numbers assessed with a duty to house has also increased, meaning an increase in
demand for all forms of temporary accommodation and for settled accommodation. 
Homeless applications and assessments 2019/20 2020/21 2021/22
Homeless applications 1022 1053 1203
Total assessments 1024 1050 1196
Assessed with a duty to house 861 866 1015
% with duty to house 84.1% 82.5% 84.9% 
At 31 March 2022, West Dunbartonshire had 512 open homeless cases having been
assessed with a duty to rehouse. 
The reasons for homeless applications shows that consistently the core drivers of
homelessness in West Dunbartonshire are households being asked to leave their current
accommodation and disputes within a household (both violent and non-violent), accounting
for over 70% of all applications. 
Reason for homeless application  2019/20 2020/21 2021/22
No. % No. % No. %
Termination of tenancy/mortgage due to rent arrears/
default on payments 38 3.7% 12 1.1% 6 0.5%
Other action by landlord resulting in the termination of
the tenancy 74 7.2% 30 2.8% 58 4.8%
Applicant terminated secure accommodation 36 3.5% 11 1.0% 24 2.0%
Loss of service/tied accommodation 1 0.1% 3 0.3% 2 0.2%
Discharge from prison/hospital/care/other institution 49 4.8% 34 3.2% 45 3.7%
Page 76

Page 77

4 
Emergency (fire, flood, storm, closing order from
Environmental Health etc.) 8 0.8% 8 0.8% 16 1.3%
Forced division and sale of matrimonial home 3 0.3% 1 0.1% 5 0.4%
Other reason for loss of accommodation 31 3.0% 18 1.7% 31 2.6%
Dispute within household: violent or abusive 215 21.0% 231 21.9% 242 20.1%
Dispute within household/relationship breakdown: non-
violent 153 15.1% 244 23.2% 227 18.9%
Fleeing non-domestic violence 38 3.7% 47 4.5% 50 4.2%
Harassment 14 1.4% 25 2.4% 26 2.2%
Overcrowding 18 1.8% 21 2.0% 14 1.2%
Asked to leave 263 25.7% 287 27.3% 377 31.3%
Other reason for leaving accommodation/household 81 7.9% 81 7.7% 80 6.7%
All 1022 100% 1053 100.0% 1203 100% 
The Council continues to perform very well in relation to the benchmark set by the Code of
Guidance on Homelessness and is largely meeting its requirements to assess homeless
applications within 28 days.  Only 16 applications were assessed out-with this timescale in
the past 3 years, with 99.6% of applications being assessed within this timescales during
2021/22. 
Length of time to assess application 2019/2020 2020/2021 2021/2022
Same day 101 9.9% 62 5.9% 80 6.7%
1-6 days 290 28.3% 289 27.5
%
286 23.9%
7-13 days 174 17.0% 203 19.3
%
222 18.6%
14-28 days 452 44.1% 492 46.9
%
603 50.4%
28-55 days 7 0.7% 3 0.3% 4 0.3%
56+ days 0 0% 1 0.1% 1 0.1%
All applications 1024 100% 1050 100
%
1196 100%
The number of homeless households who reported rough sleeping at time of presentation
over the past 3 years is outlined in the table below and shows a drop in 2021/22.
Households reporting rough sleeping at presentation 2019/20 2020/21 2021/22
Slept rough during the 3 months preceding application 91 96 79
Slept rough on the night preceding application 43 42 37 
As part of our homelessness assessment, further questions are asked to better
understand the reasons for instances of rough sleeping that are reported.  An annual
analysis of any households reporting rough sleeping prior to presentation is carried out.
Findings from this exercise show that the vast majority state that they have spent part
of an evening rough sleeping in emergency circumstances prior to presenting as
Page 77

Page 78

5 
homeless and no extended periods of rough sleeping have been identified. This
continues to be monitored as part of our wider Performance Management Framework. 
The average case duration to discharge of duty reduced in 2021/22, however this still
remains higher than it was prior to the Covid-19 pandemic. 
Average case duration to discharge of duty 2019/20 2020/21 2021/22
Average time to discharge duty 27.1 32.2 30.3 
Temporary accommodation 
The provision and use of temporary accommodation over the past 2 years has been heavily
affected by the Covid-19 pandemic. During 2020/21 an increase in demand for all forms of
temporary accommodation led to increased provision and an increase in the overall average
time households experiencing homelessness spent in temporary accommodation. We have
managed to reduce this during 2021/22, however letting activity has yet to return to pre-
pandemic levels and the number of households in temporary accommodation remains high. 
Type of temporary accommodation 2019/20 2020/21 2021/22
LA ordinary dwelling 113.9 143.1 126.5
Housing association/RSL dwelling 0 0 226.5
Hostel - local authority owned 91.7 80 70.6
Hostel – RSL 126.1 168.2 431.8
Hostel – other 79 108.6 91.5
Bed and breakfast 1.7 1.9 2.6
Women’s refuge 96 0 320
Private sector lease 0 0 0
Other placed by authority 75.1 97.4 541.8
Total (ALL) 103.5 133.6 119.4 
Households living in temporary accommodation
Type of provision Provider Occupancy
31 Mar 2021
Occupancy
31 Mar 2022
Temporary furnished flats WDC 220 222
Temporary furnished flats RSL 15 5
Temporary furnished flats PSL 9 0
Interim Supported Accommodation WDC 17 13
Interim Supported Accommodation Blue Triangle 24 30
Interim Supported Accommodation Action for Children 9 7
Other 10 4
Total households in temporary  304 281 
Outcomes 
The outcomes of all homeless applications closed during the past 3 years are outlined
in the table below:
Page 78

Page 79

6 
Outcomes 2019/20 2020/21 2021/22
Scottish Secure Tenancy 603 620 750
Private Rented Tenancy 20 26 19
Hostel 0 0 1
Bed & Breakfast 0 0 0
Returned to previous/ friends/ vol org. 98 134 129
Women’s Refuge 1 0 2
Residential care/nursing home/shared supported 0 0 0
Other - Known 63 52 65
Other - Not Known 17 13 12
No duty owed to applicant 129 178 174
Contact lost before duty discharge 95 48 43
All 1026 1071 1195 
A higher proportion of all cases being closed are being housed in settled accommodation
and there has also been further improvement in the rate of tenancy sustainment for
homeless households within West Dunbartonshire, increasing in each of the last 4 years
and above the Scottish average figure for all local authorities. 
Tenancy sustainment (homeless lets) 2018/19 2019/20 2020/21 2021/22
West Dunbartonshire Council 86.6% 90.0% 91.6% 94.6%
Scottish LA average 87.3% 87.6% 89.9% 90.2% 
Page 79

Page 80

7 
Section 2 – Key Objective Updates 
RRTP Objective 1 – Whole Systems Approach to the Prevention of Homelessness 
Our whole systems approach to the prevention of homelessness aims to ensure that
tenants and people on the housing list can review their housing options, people looking
for housing get information that helps them make informed choices and decisions about
the range of housing options available to them and that people at risk of losing their
homes get advice on preventing homelessness. 
Housing Options approach 
In addition to reviewing all current waiting list applications our Housing Options Service
aims to proactively identify those at risk of homelessness, provide advice and
assistance on preventing homelessness where possible and on the housing options
that are available to them. 
During 2021/22 there was a 68% increase in approaches being dealt with by our
Housing Options Service. The reasons for this include a more pro-active approach to
referring households for assistance but also those households who applied for
assistance from the Tenant Hardship Grant Fund have been provided with wider advice
and assistance and recorded on the Prevent1 system. In terms of outcomes, there has
been a slightly higher proportion where homelessness has been prevented compared
to 2020/21 and this will continue to be monitored closely. 
2019/20 2020/21 2021/22
Prevent1 approaches 243 385 647 
Prevent1 closures 220 276 456
*remained in current 69 84 148
*moved to alternative 57 61 106
*homeless application 59 77 133
*lost contact/NK/other 35 54 69
% homelessness prevented 57% 53% 56%
% closed with presentation 27% 28% 29% 
Enhanced Prevention Service 
As planned, a more proactive homelessness prevention service is now embedded
within our wider service delivery with a dedicated officer responding more proactively to
Section 11 referrals received by the Council. Initially funded as part of the RRTP
funding, this is now a permanent post funded by WDC. This officer initiates contact with
households at risk of homelessness where the landlord or lender is considering actions
to end the tenancy or begin the repossession process 
The ending of emergency legislation put in place banning evictions taking place in both
the social and private rented sector, has resulted in an increase in the number of
Section 11 notices being received from 20 in 2020/21 to 114 in 2021/22. Of those
where contact was made and there was engagement with the household,
homelessness was prevented in 62.5% of cases.
Page 80

Page 81

8 
Pilot Prevention Fund 
There have been around 100 referrals received in 2021/22 and with the assistance of
the Prevention Officer many of these households were able to then access other
available funding to reduce their arrears and agree an affordable repayment. A further
22 households received a direct payment from the Prevention Fund in 2021/22 totalling
£8350. This brings the total of payments from the pilot fund in the two years to 37 with a
total spend of £13,550, leaving a balance of £8,283 that can be used in 2022/23. 
Prevention Service Year 1 actual Year 2 actual Year 3 actual Year 4 plan Year 5 plan
Pilot Prevention Fund  £5,200 £8350 £8283 TBC 
Tenant Hardship Grant Fund 
In June 2021 the Scottish Government announced its intention to launch a £10m grant
fund to support private and social rented tenants who had incurred rent arrears as a
direct result of the Covid-19 pandemic. 
West Dunbartonshire Council was allocated £263,000 from this funding and we have
used this to assist tenants at risk of homelessness due to financial challenges faced as
a result of the Covid-19 pandemic. 
As at 31 March 2022: 
➢ 239 grant awards have been made totalling £263,000;
➢ 133 awards were made to RSL tenants totalling £123,718, an average of £930
per case;
➢ 102 awards were made to WDC tenants totalling £131,003, an average of
£1284 per case;
➢ 4 awards were made to tenants in private lets totalling £8760, an average of
£2190 per case. 
Review of Housing Allocations Policy 
During 2021/22 we carried out a review of our Housing Allocations Policy.  Due to the
continued high levels of youth homelessness in West Dunbartonshire, a key aim of the
review was to explore potential options to increase access to housing for young people. 
We consulted on a proposal that young people at risk of homelessness should be
created as an additional group given a reasonable preference within the allocations
policy and that a certain proportion of available properties should be allocated to this
group (this would be similar to our current provision for Young Care Leavers). 
Feedback from the consultation showed clear support for the proposal and it was
approved by the Housing and Communities Committee in February 2022. 
The expectation is that those that will be allocated housing via this route will be sourced
from live cases at risk of homelessness that are engaging with the Council’s Housing
Options Service and have an open Prevent1 case.  The quota will be reviewed and
updated annually as is the case with other groups given reasonable preference within
the policy. 
Page 81

Page 82

9 
We hope that this will be key system change in our effort to prevent homelessness and
specifically reduce youth homelessness. As with young people housed through a
homelessness application, we will ensure that the Homelessness and Housing Options
service provide full resettlement support to young people housed via this route and that
this will be resourced appropriately. 
Youth Shared Living Project 
Youth homelessness is a key challenge in West Dunbartonshire.  As part of tests for
change activity to try tackle this alongside Action for Children (AFC) the service partnered
with Simon Community Scotland (SCS) to create a pilot. The Youth Shared Living Pilot
Project was to increase access to housing for young people at risk of homelessness by
offering a shared living option.  The aim of the project was to tackle two crucial elements
that threaten tenancy sustainment within our younger population, which are identified as
social isolation and affordability.   
The pilot has been in place for 18 months. To date 42 referrals have been made to SCS,
half of those referred declined offer of the service due to not being ready etc.  Of the 21
which did, we can report the following: 
• 12 young people housed, 6 tenancies created; 
• 4 young people in the process of being matched ; and
• 5 young people unmatched 
Most of these were escalated to homeless presentation therefore homelessness was
not prevented. Of the 6 tenancies, 2 have failed to date.   
During the pilot, issues have been identified that with the SCS support worker being
external it still required high involvement of WDC staff and that having an additional
person has also led to delays sharing updates.  The pilot has also allowed for learning
to take place, specifically in terms of matching households who express an interest in
this option. Following the change to our Allocations Policy outlined above and the
recruitment of an additional resettlement worker, shared living will remain a housing
option within West Dunbartonshire Council but will be supported internally rather than
by the Simon Community. 
Plans for 2022/23 
Whilst none of our RRTP funding is now being directed specifically to prevention activities,
we have reviewed our current action plan and key activities during 2022/23 include: 
• The implementation of our revised allocations policy and close monitoring of impact
on youth homelessness;
• Recruitment of an additional resettlement officer to ensure that those young people
housed via this route get appropriate support to move into and sustain their
tenancy;
• We will continue to monitor the impact of the pilot prevention fund and consider
options to identify and provide longer term funding;
• It is expected that our Enhanced Prevention Service will include home visits now
Covid-19 restrictions are lifted;
Page 82

Page 83

10 
• We will continue to make follow up contact with homeless cases that were closed
with a non-housing outcome, to check that the housing circumstances of these
households are stable and that there is no risk of repeat homelessness (internal
process 3 months after case is closed);
• We will pilot with one RSL a process where a Section 11 referral is sent at an earlier
stage and assess positive impacts and resource implications to inform future
discussions with RSL partners to agree a consistent approach is adopted;
• We will review internal processes to ensure that adequate support is in place to
respond to an expected increase in Notice of Proceedings following Covid-19
restrictions being lifted. 
RRTP Objective 2 – Enable service users with low or no support needs to access
settled housing quickly 
One of the key aims of our Rapid Rehousing Transition Plan is ensuring that
households experiencing homelessness secure a settled, mainstream housing outcome
as quickly as possible and that time spent in any form of temporary accommodation is
reduced to a minimum. 
Our plan includes the key target of reducing the length of time homeless households
with no/low support needs spend in temporary accommodation from 23 weeks at the
end of Year 1, to 13 weeks by the end of Year 5. 
Having an efficient assessment process is important and the Council continues to
perform very well in relation to assessing homeless applications within 28 days (as
detailed in Section 1). 
The number of lets made to homeless households each year is central to achieving this
target however and our RRTP modelling takes into account the backlog of homeless
households waiting to be housed, projected future homeless decisions and projected
letting activity, to calculate the number of lets that will be required for homeless
households on an annual basis in order to meet the targets within our RRTP. 
All key stakeholders in West Dunbartonshire, including our RSL partners, were involved
in the development of our RRTP and are committed to a collaborative approach to
deliver its objectives and ensure positive and sustainable outcomes for households
experiencing homelessness. 
As part of the development of our RRTP, the concept of a Key Partner Contribution
Statement was raised and received wide support and was subsequently adopted.  The
aim of these contributions statements is for key partner organisations to formally state
support for the vision outlined and to commit to specific actions annually to help deliver
the desired outcomes we are trying to achieve. 
Year 3 activity 
Resettlement Service 
As planned, a more proactive resettlement service for all households experiencing
homelessness is now embedded within our wider service delivery, with the resettlement
officer role initially funded as part of the RRTP funding, now a permanent post funded
by WDC.
Page 83

Page 84

11 
All staff across the homeless service are involved in ensuring that a move-on plan and
appropriate resettlement support is provided.  This support is flexible and can be more
intensive for some households with low support needs. 
RRTP modelling 
We updated our RRTP modelling and the below table details the targets that were set
for Year 3 alongside the actual activity during 2021/22: 
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL  
Year 3 target  Year 3 actual
Lets required to meet demand  867 733
Split LA 567 515
Split RSL 300 218
% Allocation of lets required  
LA 56% 57%
RSL 55% 46% 
Each of our RSL partners updated their Contribution Statement at the beginning of
2021/22 and agreed new letting targets to help achieve our aim of reducing the time spent
in temporary accommodation for those households with no/low needs to 17 weeks in Year
3 of our plan. 
During 2021/22, whilst WDC increased the percentage of available lets that were made
to homeless households, this was lower in number than projected due to reduced letting
activity.  Not all RSL’s agreed to meet a 55% lettings target and only 3 of 8 RSL’s were
able to meet their agreed own target. In addition, the overall letting activity across all the
RSL’s was also lower than projected, resulting in an overall shortfall of lets and some
households being in temporary accommodation for longer than our target timescales. 
Despite this, 592 homeless households with no/low support needs were rehoused and
supported to move into settled accommodation. The overall length of time these
households spent in temporary accommodation reduced from 19 weeks in Year 2 to 16.7
weeks in Year 3, meeting our target of 17 weeks. 
Year 1 Year 2 Year 3
Target 23 weeks 20 weeks 17 weeks
Actual 15 weeks 19 weeks 16.5 weeks 
Year 4 plan 
Our target for the end of Year 4 is to reduce the time homeless households with no/low
needs spend in temporary accommodation to 15 weeks. 
Year 1 Year 2 Year 3 Year 4 Year 5
Target 23 weeks 20 weeks 17 weeks 15 weeks 13 weeks
Actual 15 weeks 19 weeks 16.5 weeks   
Page 84

Page 85

12 
We update our RRTP model on an annual basis and the key outputs in terms of lets
that are necessary to meet the targets outlined in our RRTP during 2022/23 are
outlined in the table below: 
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL  
Year 4 
Lets required for to meet demand  986
Split LA 641
Split RSL 345
Projected turnover   Year 4 
Split LA 929
Split RSL 500
% Allocation of lets required  Year 4 
LA 69%
RSL 69% 
Our modelling currently projects that around 1150 households experiencing homelessness
will need to be housed across all tenures in 2022/23, in order for our target of reducing
time spent in temporary accommodation to be met. This accounts for a high proportion of
all social lets across West Dunbartonshire and the Council has committed to ensuring that
69% of all lets made in 2022/23 are made to households experiencing homeless. 
The outcomes of our modelling have been shared with key strategic partners within
West Dunbartonshire and we are engaging with our RSL partners to support the
objective of meeting the number of lets to homeless households required in 2022/23 to
meet the targets outlined in our RRTP and include this commitment within their RRTP
Contribution Statement for 2022/23. We have written to all our RSL partners to request
that they match the 69% lettings target committed to by the Council. 
At present we have seen lower numbers of voids being returned for let at West
Dunbartonshire Council.  As a result, overall case numbers are increasing and at the
end of March 2022 we had 145 cases that have been open longer than the target
outlined in our RRTP. The majority of these cases are in temporary accommodation
and on offer waiting for properties to be made available to let.  If the return rate doesn’t
return to pre-Covid19 levels this will seriously impact times spent in temporary
accommodation along with overall numbers in temporary accommodation. 
RRTP Objective 3 – Interim housing options which enable independent living
and housing sustainment 
Interim Supported Tenancies 
Another key element of our vision was the introduction of an enhanced Housing
Support Service for those households with medium/high support needs. 
The Covid-19 pandemic resulted in an increase in demand for all forms of temporary
accommodation, due to an increase in homeless applications and restrictions that
paused and limited letting activity across the sector. New ways of working had to be
developed and following the recruitment of 2 Property Officers within the support
Page 85

Page 86

13 
service and redirecting 2 existing Support Workers to carry out this function in Year 2
we managed to increase the capacity of existing support workers to provide support
directly to homeless households. 
We therefore did not need to recruit an additional support worker from the RRTP
funding as originally planned, though we did recruit an additional senior post to help
manage this increased demand, with 20% of the post funded by the Council, and 80%
from the RRTP funding.  As a result of the Covid-19 pandemic we still have higher
numbers of households in temporary accommodation than expected, we have been able
to mainstream this role from Year 4 and it is now be funded from Council resource and
embedded within our wider service delivery. 
Supported Accommodation Review 
One of the interim housing options provided by WDC is residential supported
accommodation, which provides support services in line with the prescribed
circumstances contained within the Homeless Persons Interim Accommodation
(Scotland) Regulations 2002 and provides a safe, transitional housing option when
people can’t or don’t want a mainstream tenancy of their own and benefit from the
reassurance of having access to onsite support that is both planned and responsive. 
Such support includes consideration of general health and wellbeing, budgeting,
substance use, training and employment, community connections and overall
preparation for successful tenancy sustainment. 
A key action in Year 3 was to commission a full review of our provision of residential
supported accommodation within the context of the updated Ending Homelessness
Together Action Plan, the updated Unsuitable Accommodation Order and a range of
new policy and legislative standards on temporary accommodation arising from the
Covid-19 pandemic and national policy agenda. 
In July 2021, Arneil Johnston was commissioned to carry out this review. A six-stage
project methodology was delivered to complete the review including a performance
diagnostic, lived experience primary research, stakeholder engagement, service
redesign, temporary accommodation modelling and financial impact assessment. 
Some of the key findings of the review include:
• Whilst Residential Supported Accommodation should continue to be delivered as
an option for those with moderate-complex needs, there is likely to be less
required in future years;
• All supported accommodation projects should be founded on a trauma-based care
model;
• Current supported accommodation projects should be reshaped to provide
opportunities for gender specific provision and should be smaller units;
• The length of stay in trauma informed supported accommodation should be based
around a structured support planning journey enabling independence;
• There is a gap in current supported provision for a small but significant population
of service users;
➢ For those who are unwilling/unable to engage with support but who need a
safe place to stay for intermittent periods of time (rapid access
accommodation); and
Page 86

Page 87

14 
➢ For those who may need permanent supported accommodation not homeless
accommodation (will require partnership working and potentially joint
commissioning with the HSCP);
• Current provision is contributing to bottlenecks in terms of households not being
able to move to settled accommodation and to a backlog of homeless households
in temporary accommodation. 
To deliver the optimum service model, it is anticipated that a three year plan will be
required. This will include the decommissioning of some existing services, the
commissioning of new provision in order to better meet identified need and a full
financial impact assessment.  In order to develop and lead on the development and
implementation of this plan we are seeking to recruit an additional resource to lead
on the delivery of new residential supported accommodation. 
Conversions 
Due to the need to fund other elements of our RRTP, we did not plan to use any of
our ring fenced RRTP funding for our Conversion Programme.  In Year 3 we
increased our own resources from £50,000 to £75,000 to support 30 conversions. 
Due to delays in recruiting additional Housing First support workers, we
anticipated an underspend in this budget and used this to increase the number of
conversions we were able to carry out from 30 to 45.  We aim to continue to
provide this funding in future years to ensure this option remains part of our wider
mainstream service response and currently plan for a minimum of 30 conversions
during 2022/23. 
Housing Pathways 
Within West Dunbartonshire we have well established housing pathways and
protocols relating to prison leavers, Young Care Leavers and those being discharged
from hospital. We have also developed clear housing advice and information about
housing options for those leaving the armed forces and we have refreshed our “No
Home for Domestic Abuse” policy and approach in response to the the Domestic
Abuse Protection (Scotland) Act 2021. 
Whilst work has begun in relation to reviewing our existing protocols with mental
health services the Alcohol and Drugs Partnership, these have not yet been
completed due to the impact of the pandemic in terms of staffing resources and
priorities particularly within the Health and Social Care Partnership. 
Initial work began in Year 3 researching the experiences of LGBT+ communities
accessing housing. We also updated our equalities data questions to improve the
data we capture for all protected characteristics.  In year 4 our aim is to provide
training for staff on housing and LGBT+ related issues to increase awareness and
Conversion Programme   Year 1
actual 
Year 2
actual 
Year 3
actual 
Year 4
plan 
Year 5
plan 
Number of Conversions  11  32  45  30  30 
Cost per Conversion  £2,500  £2,500  £2,500 £2,500  £2,500 
Cost per Year  £27,500  £80,000  £112,500  £75,000  £75,000 
Page 87

Page 88

15 
highlight practices that could have a potential negative impact in relation to
accessing housing.
RRTP Objective 4 – Housing First 
A key element of our plan was the introduction of a Housing First Service.  This is
now well established within West Dunbartonshire as it was implemented in Year 1
of our plan. 
Year 3 activity: 
• We have created 28 new Housing First tenancies – due to delays in recruiting
additional staff, this is lower than the 35 new Housing First tenancies we projected at
the beginning of the year;
• Whilst we recruited 3 additional FTE Housing First Support Workers, the delay in
recruitment resulted in reduced staffing costs.
• This reduced staffing cost and the lower than targeted new Housing First tenancies
has impacted on planned resources for Housing First in Year 3 in the following ways:
➢ Reduced tenancy set-up costs from £140,500 to £116,000; and
➢ Reduced staffing costs from £344,000 to £301,000.
• Unfortunately one Housing First tenant died during 2021/22 and the tenancy ended;
• In total 3 Housing First tenancies have now ended due to the death of the tenant
since our Housing First initiative started;
• We have 3 tenancies being sustained where the Housing First support has been
stepped down;
• At year end we therefore have a total of 42 Housing First tenancies being actively
supported; 
2019/20 2020/21 2021/22 Total
Housing First tenancies created 5 15 28 48
Housing First tenancies ended (deaths) 1 1 1 3
Housing First tenancies at Step Down 0 1 2 3
Housing First tenancies with active support    42 
• We continued to provide regular updates on the progress of our Housing First
initiative to the Housing and Communities Committee, the Housing Solutions
Partnership and the Alcohol and Drugs Partnership;
• We also now provide up to date data to the Scottish Government via the Housing
First monitoring return which was introduced in 2021/22;
• We have delivered on our commitment that at least one new build home in each new
Council development is allocated to a Housing First tenant. 
Page 88

Page 89

16 
Our Year 4 plan and costings for Housing First is outlined below: 
As outlined above in this update report, we have now managed to mainstream most
of the initiatives and enhanced service provision introduced as part of our Rapid
Rehousing Transition Plan. This means that the £238k funding received from the
Scottish Government, along with any underspend from the previous year, can now be
used to fund Housing First in West Dunbartonshire. 
Whilst this funding will allow us to upscale Housing First, it will not be to a level that
fully meets identified demand and the service will need to operate with a targeted
capacity. 
We have fully updated our activity and costings model and made the following changes: 
• We have continued with 8 FTE HF Support Workers and removed the planned
increase that would be needed for fully meet identified demand;
• We have reduced the projected new Housing First tenancies in Year 4 from 36 to 14;
• We have retained our assumptions around the staff/client ratio at 1 worker to 7
clients;
• Following feedback from the Housing First Pathfinder and other networking
opportunities we have modelled the level of HF support being maintained in future
years;
• Following feedback from the Housing First Pathfinder and other networking
opportunities we have reduced the HF tenancy set-up costs from £2500 to £1500;
• Due to available funding we have replaced the annual Housing First tenancy
sustainment budget of £1000 per HF tenancy, with an Diversionary Activities Budget
of £18,000 to cover all HF clients;
• We have updated expected staffing costs. 
Funding currently available means that our Housing First Service will operate at capacity
during 2022/23. In addition to the 42 HF tenancies currently being actively supported, at
year end a further 10 had been assessed by the service and were waiting for an offer of
housing and a further 6 were waiting for the Housing First assessment to be completed. 
We recognize that some capacity may come from existing Housing First tenancies ending
or the support being stepped down and we will monitor this closely. 
We have therefore projected no additional Housing First tenancies will be created in
Year 5 and have projected no tenancy set-up costs. Current funding does allow for the
provision of an £11,000 Diversionary Activity Budget in Year 5 and we will continue to
monitor the use of this budget in 2022/23. 
We are currently taking part in a Housing First Check Up process in conjunction
with Homeless Network Scotland and will respond appropriately to a final report
that will provide a view on areas of success and challenge. 
We will explore funding options and delivery models to sustain Housing First in
future years. 
Page 89

Page 90

17 
Housing First Year 1 actual Year 2 actual Year 3 actual Year 4 plan Year 5 plan
Number of HF Support Workers 2.5 @ £38 4 @ £38 8 @ £43 8 @ £44 8 @ £44
Staffing costs 95,000 152,000 301,000 352,000 352,000
Tenancy set-up and sustainment 12,500 57,500 116,000 39,109 11,000
Delivering Housing First 107,500 209,500 417,000 391,109 363,000 
Number of Clients
•Year 1 - 5 clients
•Year 2 - 15 clients
•Year 3 - 28 clients
•Year 4 - 14 clients
•Year 5 - funding to
support 56 existing
clients
Year 4 Costs
•£1500 furniture set up
costs per client
•£18,000 Diversionary
Activity Budget
•1 worker per 7 clients
at £44k
Level of Support
•1 worker per 7 clients
•Support is maintained
at same levels to Year
1 until tenancy is
Stepped Down
Page 90

Page 91

18 
Section 3 – Resource Plan 
The implementation of our Year 3 plan as outlined above has resulted in an underspend
of £36,393 from our resource plan at the beginning of the year. 
RRTP Year 3 spend Year 3 plan Year 3 spend Year 3 underspend
Housing First West Dunbartonshire £480,657 £417,000 £63,657
Interim Supported Tenancies £31,200 £31,200 £0
Additional Resettlement Support Service £38,500 £38,500 £0
Enhanced Prevention Service £38,500 £38,500 £0
Pilot Prevention Fund £16,633 £8,350 £8,283
Shared Living Initiative £28,810 £28,810 £0
Review of Residential Supported
Accommodation
£18,000 £16,048 £1,952
Conversion Programme £75,000 £112,500 _- £37,500
Year 2 totals £727,630 £690,908 £36,392 
We have received SG RRTP funding of £238,000 for Year 4 and in addition to
mainstreaming some of the initiatives introduced as part of our RRTP, we have also
managed to secure the contribution from Housing and Homelessness of £200,000 to
help deliver our RRTP. Following the review of our RRTP based on Year 3 activities,
our refreshed costings and funding for Year 4 are outlined below: 
RRTP Year 4 costings 
Housing First West Dunbartonshire £391,109
Pilot Prevention Fund £8,283
Conversion Programme £75,000
Year 4 total cost £474,392 
RRTP Year 4 funding 
Year 3 underspend £36,392
SG funding for Year 4 £238,000
Housing and Homelessness contribution £200,000
Year 4 total funding £474,392 
Whilst the £238,000 SG funding for Year 4 is to be we are still faced with a significant
shortfall if we are to continue to upscale Housing First to meet the identified need within
West Dunbartonshire. 
Page 91

Page 92

19 
Appendix 1 – Gendered Analysis of Homelessness in 2022/23 
From our analysis last year there have been only slight changes of 1% to 2% increase or
decrease in the various categories, nothing at this moment that requires highlighting at
this stage. 
Presentations
• 48% of presentation in 2022/22 were female (either single person or head of
household)
• Of those that presented as homeless who were ages 16 to 24 59% were female
(15% of overall presentations)
• Single parent households account for 21% of all presentations.  This is split 19%
female and 2% male
• Single persons account for 70% of all presentations.  This is split 23% female and
47% male.
• 20% (242) of households who presented stated their reason for homelessness was
domestic abuse.  Of these households 88% were female.  Just over a sixth of
which were ages 16 to 24.  In addition to this of all those who stated this reason,
45% were female single parents, 33% were single females and 10% were single
males.   
Assessments 
• 48% of all homeless  assessments were in 2021/22 were female (either single
person or head of household)
• Of those who had a homeless assessment  who were ages 16 to 24 59% were
female (15% of overall assessments)
• 85% (1015) of households assessed were assessed as homeless or threatened
with homelessness.  Of which 44% were single males, 24% were single females
and 20% were female single parents. 
Outcomes
• 1017 cases closed in 2021/22, contacted was maintained with 979 households.
• 53% received a local authority tenancy.   47% was a female led household and
53% male.  
• 24% received an RSL tenancy.  51% were female and 49% male
• 9% returned to previous accommodation.  65% female and 35% male 
Page 92

Page 93

20 
Pathways
Pathway Female Male
1- No/low needs/no TA required 53% 47%
2- No/low needs/TA required 38% 62%
3- No/low needs/refuge 91% 9%
4- Med/high needs/supported tenancy 33% 67%
5- Med/high needs/supported refuge  85% 15%
6- Med/high needs/supported hostel 18% 83%
7- Med/high needs/hostel supervision 0% 100%
8- High/complex needs/HF 25% 75%
Withdrew prior to assessment 0% 0%
Withdrew prior to assessment
decision  45% 55%
Page 93

Page 94

RAPID
REHOUSING
TRANSITION
PLAN
2021/22 Monitoring Report - activity and funding
(RRTP funding - part of the Ending
Homelessness Together Fund) 
Appendix 2
Page 94

Page 95

1 
Scottish Government Ending Homelessness Together Fund 
Monitoring Implementation of Rapid Rehousing Transition
Plans 
As part of the Scottish Government’s Ending Homelessness Together Fund, funding
of £8m was agreed with COSLA for 2021/22.   
As with previous years, we are asking all local authorities to provide a written report
on progress to date and how they have spent their allocation of funding. We would
ask local authorities to remember to include all funding carried over from previous
financial years.   
We would ask that all local authorities complete this report and include it with their
amended RRTP for 2022/23 or the latest version available which should be
submitted to the Scottish Government by 30 June 2022. We realise this may be
subject to final accounts being cleared by Audit. 
Included is a template to provide detail on specific activities which should be
replicated for each activity you have taken forward in implementing your Rapid
Rehousing Transition Plan. For example we are looking for information on specific
activities such as prevention; recruitment of staff; temporary accommodation; shared
tenancies; or mediation. Following feedback from the RRTP Sub-Group, this year’s
template has been amended to capture information on the impact/outcomes of
activities.  This will enable the Scottish Government to develop the RRTP Report
showing impact which is developed for the Homelessness Prevention and Strategy
Group. 
We have now included a separate section of the template specifically for Housing
First. This will enable us to capture information on Housing First across Scotland,
how local authorities are delivering Housing First and to understand partnership
arrangements. 
We have also included a template for reporting on RRTP funding which has not been
spent during 2021/22 and previous financial years. We are looking for detail of how
local authorities plan to spend any previously carried over funding during 2022/23.   
Please submit this report, your RRTP, an updated EQIA and any accompanying
documents to:  RapidRehousingTransitionPlansMailbox@gov.scot 
If there are any questions then please send them to the mailbox and a member of
the team will contact you to discuss. 
Local Engagement and Rapid Rehousing Team
Page 95

Page 96

2 
Details of funding recipient 
Local Authority West Dunbartonshire Council 
Reporting Period 01/04/2021 to 31/03/2022
DD/MM/YYYY  DD/MM/YYYY
Reporting Officer Claire Mckay 
Position Senior Housing Development
Officer
Date Completed 18/05/2022 
Total RRTP Funding
carried over from
2020/21
£293,300 (includes
the £156,000 winter
allocation) 
RRTP Funding
received for 2021/22 
£234,000 
Page 96

Page 97

3 
2021/22 Activity 
Activity Name: Interim Supported Tenancies 
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
The Covid-19 pandemic resulted in an increase in demand
for all forms of temporary accommodation, due to an
increase in homeless applications and restrictions that
paused and limited letting activity across the sector. New
ways of working had to be developed and following the
recruitment of 2 Property Officers within the support service
and redirecting 2 existing Support Workers to carry out this
function in Year 2 we managed to increase the capacity of
existing support workers to provide support directly to
homeless households. 
We therefore did not need to recruit an additional support
worker from the RRTP funding as originally planned, though
we did recruit an additional senior post to help manage this
increased demand, with 20% of the post funded by the
Council, and 80% from the RRTP funding. As a result of the
Covid-19 pandemic we still have higher numbers of
households in temporary accommodation than expected, we
have been able to mainstream this role from Year 4 and it is
now be funded from Council resource and embedded within
our wider service delivery. 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
31,200  
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
This role has been critical in managing the provision of
temporary accommodation and allowing for the support
workers to concentrate on providing support. The role is
now fully funded from West Dunbartonshire Council
resources. 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
The senior role has meant we haven’t had to recruit
additional support staff as they now focus on support and
Senior property officers oversee the provision and turnover
of temporary accommodation.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
NA
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other   
Implementation in 2022/23:  
Page 97

Page 98

4 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
This is now permanent and funded from WDC resources.
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
As above.
Please duplicate the above table for each activity you have undertaken in your RRTP for example: 
RRTP co-ordinator and other costs (prevention; flipping tenancies; mediation, etc.).  
Page 98

Page 99

5 
2021/22 Activity 
Activity Name: Pilot prevention fund
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
Linked to the enhanced prevention officer role, we were
able to source £21,000 in Year we carried out a survey
with our partners on pilot options, the overwhelming
support was a Prevention Fund
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other 
8,350 
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
There have been around 100 referrals received in 2021/22
and with the assistance of the Prevention Officer many of
these households were able to then access other available
funding to reduce their arrears and agree an affordable
repayment. A further 22 households received a direct
payment from the Prevention Fund in 2021/22 totalling
£8350. This brings the total of payments from the pilot fund
in the two years to 37 with a total spend of £13,550,
leaving a balance of £8,283 that can be used in 2022/23. 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
Following a payment from the pilot Prevention Fund and a
repayment arrangement for any outstanding arrears being
made, court action against these households was halted
reducing potential evictions and homelessness.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery.
This Prevention Officer liaises closely with our RSL
partners to stop eviction actions being taken forward and
has close links with services which can help address
support needs identified.
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other 
8,283 
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
Will continue to monitor the effectiveness of the fund in
preventing homelessness. 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
Funding dependent. 
Page 99

Page 100

6 
2021/22 Activity 
Activity Name: Conversions
Activity Description:
Provide a short overview of the aims
and the transformative nature of this
activity.
Converting temporary furnished flats to secure tenancies
has proved to be a successful and highly popular option
across West Dunbartonshire when this has been available.
Our initial plan identified a funding requirement to support a
conversion programme of temporary accommodation to
Scottish Secure Tenancies, reducing the number of
transitions and improving tenancy sustainment rates for
homeless households. 
Allocation Spent on
activity: 
£
SG RRTP funding Local Authority funding Other
37,500 75,000 
Overview of progress made
to date:
Provide a short summary of the work
undertaken in the past year, progress
made and challenges.
Due to the need to fund other elements of our RRTP, we
did not plan to use any of our ring fenced RRTP funding for
our Conversion Programme. In Year 3 we increased our
own resources from £50,000 to £75,000 to support 30
conversions. 
Due to delays in recruiting additional Housing First support
workers, we anticipated an underspend in this budget and
therefore used this to increase the number of conversions
we were able to carry out from 30 to 45. 
Impact of Activity:
Evidence of the impact of this activity,
including any financial saving and how
many households have benefited from
this activity. 
This options means that a homeless household doesn’t
need to move again for their permanent offer, so when they
are settled and happy a conversion can be offered. This
has contributed to increasing rates of tenancy sustainment
for households that have experienced homelessness.
Partnership Working:
Provide detail of all partners involved in
this activity and how they have
supported delivery. 
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other 
75,000 
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for this activity during
2022/23. 
We aim to continue to provide this funding in future years to
ensure this option remains part of our wider mainstream
service response and currently plan for a minimum of 30
conversions during 2022/23. 
Plans for mainstreaming
this activity:
Already mainstreamed.
Page 100

Page 101

7 
Provide detail of the timescale and
plans to mainstream / when this activity
will end: 
Page 101

Page 102

8 
Housing First Progress 
Housing First Progress:
Provide a short overview of progress to
date in developing and implementing
Housing First in your local authority
area. 
Housing First West Dunbartonshire was established in
2019 to assist those with the most complex needs into
settled housing. During the time of the RRTP the aim is
to continue to expand the service to allow for more
tenancies to be offered. We have managed to continue to
upscale the service and as we learn and make
operational changes e.g. moving from a staff, client ratio
of 1:6 to 1:7 to match the pathfinders. 
Housing First Tenancies 
Provide an overview of how many Housing
First tenancies have started area and the
plans for scaling up Housing First in future
years. Also provide the average support cost
of each Housing First tenancy. 
In Year 3 we created 28 tenancies, our original aim was 35
at the start of the year on the basis we would recruit 3
additional support workers however, the recruitment of the
3rd was delayed until Feb 22 therefore reducing the
capacity by 7. 
We have created a total of 48 in the first 3 years of the
service. Based on current staffing costs and staff, client
ratio, the average support cost for a Housing First tenancy
is £6,285. 
Housing First Furniture
Packages 
Provide an overview of any furniture
packages you provide to each Housing First
tenancy, including an average cost of
furniture packages and how they are funded. 
Years 1-3 we have used the RRTP funding and allocated
£2,500 for furniture packages provided to each new
Housing First tenancy created. Following the HF framework
and analysis of our spending we have now reduced this to
£1,500. This cost is part of the overall cost of delivering
Housing First in West Dunbartonshire and is currently
funded from both the RRTP funding received from the
Scottish Government and from WDC resources. 
Housing First Partners 
Provide detail of all Housing First partners
who are supporting the delivery of Housing
First. 
We work closely with the landlords of all Housing First
tenants, including our colleagues in Housing Operations as
well as Loretto Housing Association who have provided
properties for Housing First tenants. 
Operationally Housing First support workers work closely
with a range of services including addiction services,
mental health services, criminal justice and Working For
You. 
At a strategic level we also provide regular updates on
Housing First to the Housing and Communities Committee,
to the Alcohol and Drug Partnership meetings and the
Housing Solutions Partnership.
Allocation Spent on
Housing First: 
£
SG RRTP funding Local Authority funding Other
417,000  
Page 102

Page 103

9 
Impact of Housing First:
Evidence of the impact of Housing First,
including any financial saving and
savings identified by other public bodies
if it has been measured. 
Impact of the tenancies to date;
Tenancies
created
2019/20 2020/21 2021/22 Total  
Total HF
tenancies
created
5 15 28 48  
HF tenancies
ended (deaths)
1 1 1 3  
HF tenancies
stepped down
0 1 2 3  
HF tenancies
being supported   
42   
Of the 48 Housing First tenancies created to date in West
Dunbartonshire, only 3 have ended and all of these were
the result of the death of the tenant. 
Future spend planned on
this activity in 2022/23: 
£
SG RRTP Funding Local Authority funding Other
266,109 125,000 
Implementation in 2022/23: 
Provide a short summary of the aims
and targets for Housing First during
2022/23. 
Based on funding that is currently available we have
continued with 8 FTE HF Support Workers which will allow
us to support 56 Housing First tenancies. 
We have not been able to upscale Housing First further to
fully meet identified need within West Dunbartonshire. 
We have therefore reduced the projected new Housing First
tenancies in Year 4 from 36 to 14. 
We have retained our assumptions around the staff/client
ratio at 1 worker to 7 clients. 
Following feedback from the Housing First Pathfinder and
other networking opportunities we have modelled the level
of HF support being maintained in future years. 
Following feedback from the Housing First Pathfinder and
other networking opportunities we have reduced the HF
tenancy set-up costs from £2500 to £1500. 
Due to available funding we have replaced the annual
Housing First tenancy sustainment budget of £1000 per HF
tenancy, with a Diversionary Activities Budget of £18,000 to
cover all HF clients. 
We are currently taking part in a Housing First Check Up
process in conjunction with Homeless Network Scotland and
will respond appropriately to a final report that will provide a
view on areas of success and challenge.
Page 103

Page 104

10 
Plans for mainstreaming
this activity:
Provide detail of the timescale and
plans to mainstream. 
We will explore funding options and delivery models to
sustain Housing First in future years. 
Page 104

Page 105

11 
Unspent RRTP Funding 
Please provide the total
RRTP funding provided by
the Scottish Government for
the implementation of the
Rapid Rehousing Transition
Plan in your area that has
not been spent to date. 
£ 28,109 
Provide detail of how this funding will be spent on implementing the Rapid
Rehousing Transition Plan in 2022/23 detailing the area that it will be used in. 
Please make clear the individual amounts 
ACTIVITY
FUNDING TO BE
CARRIED FORWARD
Housing First £ 28,109 
£  
£  
£  
£  
£  
£  
£  
£  
£  
Page 105

Page 106

Page 106

Page 107

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 24 August 2022
__________________________________________________________________
Subject: “Involving You”, West Dunbartonshire Council’s Tenant
Participation Strategy 2021-24 - Annual Progress Report
1. Purpose
1.1 This purpose of the report is to provide the Housing and Communities
Committee with an annual progress report on the implementation of “Involving
You”, West Dunbartonshire Council’s Tenant Participation Strategy which
covers the period 2021-24.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the progress and achievements made in relation to the implementation
of the first year of the strategy’s action plan, including the key role played by
tenant representatives in improving housing services.
3. Background
3.1 The Council has a statutory obligation under the Housing (Scotland) Acts
2001 and 2010 to produce and adequately resource a Tenant Participation
Strategy to evidence a strong commitment to involving tenants in shaping
and improving housing services.
3.2 Our current Tenant Participation Strategy called “Involving You” covering the
period 2021 to 2024 was approved by the Housing and Communities Committee in
February 2021. This strategy builds on the positive developments of previous
strategies successfully implemented since 2001.
3.3 In addition to being a legislative requirement, involving tenants and other
service users in decisions about their homes and communities is now accepted
as best practice for all social housing providers. The Tenant Participation
Strategy supports this Council’s commitment to deliver positive outcomes for
our tenants and wider communities.
3.4 West Dunbartonshire Council continues to be an exemplar organisation in
supporting tenant participation activities.  The Council was the first local
authority in Scotland to be awarded Gold Accreditation by TPAS Scotland
(Tenant Participation Advisory Service - Scotland).  This followed a robust
scrutiny of our tenant participation provision and included TPAS Scotland
examining our practices and interviewing tenants and staff. The service
scored an overall grade of 6 which equates to “an excellent provision of tenant
ITEM 11
Page 107

Page 108

participation with outstanding sector leading strengths in the majority of
standards”.
4. Main issues
4.1  “Involving You” is underpinned by the following strategic vision:-
“West Dunbartonshire’s Housing Services’ vision for tenant participation is
one of sharing information with our tenants, future tenants and other service
users in a variety of ways; providing opportunities for them to express their
views in a way that suits them; listening to and acting on tenants’ views to
improve the housing services we provide and allowing our tenants to
scrutinise our performance”.
4.2 The aims of the strategy are to:
• Improve the culture and practise of involving tenants across housing services;
• Improve feedback to tenants to show where they have influenced or shaped
the housing service;
• Promote and provide a wide range of options for tenants to get involved;
• Encourage involvement of under-represented groups;
• Ensure that tenants are aware of the options available to shape housing
services;
• Assess our performance in line with the Scottish Social Housing Charter and
involve tenants in our Annual Tenant Report;
• Ensure that resources we put in place and practices we carry out are
adequate to support and develop tenant involvement; and
• Make sure that we communicate effectively with tenants and provide good
quality, accessible information that tenants want.
The strategy has a comprehensive set of actions aimed at achieving these key
aims over the 3 year period and progress in terms of implementation at the end
of Year 1 is summarised below (Appendix 1 sets out the full detail of the action
plan).
“Involving You” Tenant Participation
Strategy 2021/24 Total
Progress at end of Year 1 7 35 0 0 0 42
Action Status Key
Completed Not Started;
In Progress
Check
Progress Overdue Cancelled
Page 108

Page 109

Improve the culture and practise of involving tenants across housing services
4.3 Improving the culture and practice of Tenant Participation across housing
services is a key aim to ensure that changes are embedded across all housing
service areas.
4.4 Key achievements during 2021/22 include:
• All Tenant Participation activities being sustained whilst Covid-19
restrictions were in place;
• Virtual meetings facilitated to ensure that tenant representatives had regular
access to the Housing Convener, Senior Housing Managers and all relevant
officers;
• Published an annual Tenant Participation performance report (attached as
Appendix 2);
• The production of an electronic quarterly Tenant Participation for tenant
representatives, Elected Members and staff to maximise awareness of
tenant participation activities;
• Publicising outcomes of consultations as well as tenant involvement in
WDC/WDTRO (West Dunbartonshire Tenants and Residents Organisation)
Liaison, Joint Rent Group, Scrutiny Panel and TRA (Tenant and Resident
Associations) activities to demonstrate the impact tenants can have;
• Created an online ilearn course for staff to increase understanding of
Tenant Participation and the role staff play.
Improve feedback to tenants to show where they have influenced or shaped the
housing service
4.5 The Consultation Toolkit continues to be used to facilitate effective feedback to
tenants when reviewing policies or practices. In 2021/22 it was used in the
review of the Allocation Policy, Local Housing Strategy and the Rent Setting
process and consultation summaries were provided as part of the background
papers provided to the Housing and Communities Committee. 
4.6 Housing News is used to publicise outcomes from consultations to help
encourage more tenants get involved and demonstrate that they can influence
decisions and policies. Direct feedback also given to all tenants attending the
virtual rent setting meeting.
4.7 A consultation calendar is created and published on the Council’s website
annually which aims to ensure that tenants are aware of when they can give
their views. There is also a consultation outcome section on the webpage to
demonstrate the impact tenants views have had.
4.8 Tenants and Residents Associations are also supported to demonstrate their
achievements at a more local level as well as using the Housing News to
promote their activities.
Page 109

Page 110

Promote and provide a wide range of options for tenants to get involved
4.9 We continue to promote a wide range of options to encourage tenants to get
involved in a way that suits them.  We use the Housing News to advertise
tenant group meetings and activities, as well as specific articles on the Joint
Rent Group and Scrutiny Panel activities.  The WDTRO also have a regular
column which they use to promote their activities. 
4.10 Tenant involvement in scrutinising Housing Services is also supported and the
Scrutiny Panel’s reports are publicised in the Housing News, on our Tenant
Participation webpages and shared with the WDTRO.
4.11 We have developed a digital hub via Mighty Networks as a more interactive and
accessible option to increase tenant participation. It is being piloted initially by
the Scrutiny Panel and has been well received. 
4.12 We have promoted the personal as well as community benefits of getting
involved/volunteering and created a leaflet to promote these aspects and used
an article in the Housing News to focus on them.
4.13 We have helped embed the “Estate Walkabout” process for tenants to inspect
their local area and ensure that agreed actions from these activities are
recorded and updates provided, so that they are effective and encourage other
tenants to participate.
Encourage involvement of under-represented groups
4.14 Meetings with members of West Dunbartonshire Youth Development team have
taken place, as well as with the Youth Alliance and YSORTIT, to explore
opportunities to develop a Youth Housing Forum. There was not support for a
specific youth housing forum but agreed a more effective option is for closer
working with Tenant Participation.
4.15 Regular contact has been established with tenants at the Gypsy Travellers site
at Dennystoun Forge to increase trust and offer dialogue opportunities in a way
they are comfortable with.
Ensure that tenants are aware of the options available to shape housing
services
4.16 To ensure tenants are aware of the options available to shape housing services
and budgets, we continue to promote these widely through Housing News, our
Tenant Participation Updates and online.
4.17 Our annual rent setting consultation process continues to develop transparency
around the Housing Revenue Account (HRA) which tenants and the Scottish
Housing Regulator are looking for. Our Joint Rent Group continues to meet
Page 110

Page 111

monthly, with tenant volunteers and key housing and finance staff working jointly
on improving the Council’s compliance with HRA Guidance, as well as making
budget processes more transparent.
Improve involvement in monitoring performance through our Scrutiny Panel and
encourage tenant scrutiny activities
4.18 In line with the Scottish Social Housing Charter we continue to develop tenant
involvement in monitoring our performance and becoming involved in scrutiny
activities. During 2021/22, our Scrutiny Panel completed their sixth scrutiny
exercise looking at the Council’s complaints process. A report was presented to
the Housing Improvement Board in October 2021 and all the Panel’s
recommendations were accepted and will be implemented throughout 2021/22.
4.19 We were able to recruit a new Panel member and training with them and
refresher training with existing members who wanted it, was carried out in May
2022. 
Ensure that resources we put in place and practices we carry out are adequate
to support and develop tenant involvement
4.20 We continue to review the resources required to improve tenant participation
and tenant scrutiny. The Tenant Participation budget is monitored monthly and
reviewed annually. During 2021/22 we have continued to support 12 Tenant
and Resident Associations, the WDTRO, Sheltered Housing Forum, Joint Rent
Group, pre-HACC (Housing and Communities Committee) Forum and Scrutiny
Panel to help them function effectively. 
4.21 Training opportunities have been more limited in the last year but we still
encouraged tenants to take advantage of those on offer which included:
• funded three tenants to attend the TPAS Scotland conference in Clydebank;
• funded a Scrutiny Panel member to attend a TPAS Scotland Scrutiny
online session on report writing; and
• Provided in-house treasurer, secretary and chairperson training for all new
office bearers.
Make sure that we communicate effectively with tenants and provide good
quality, accessible information that tenants want
4.22 We continue to ensure that we communicate effectively and provide good
quality accessible information that tenants want, primarily through our quarterly
newsletter Housing News which is delivered to all tenants.  As part of the
Accreditation process, TPAS Scotland commended us on the quality of our
communication with tenants and in particular our Tenant Participation Strategy.
4.23 We continually update the content of our Tenant Participation webpages to
keep them up to date and ensure they are a useful resource for tenant groups
Page 111

Page 112

and to share meeting information. In order to be published on the Council’s
website, all documents must comply with accessibility standards.
4.24 Our Facebook page has increased in terms of the number of followers it has,
particularly during and since lock-down, and we use this to share local
community news, activities and promote consultations and ways to get involved.
4.25 During 2022/23 the following key actions from the Strategy will be delivered:
• Develop tenant involvement in the decision making process of setting rents,
Capital Programmes and review of Business Plan;
• Promote Tenant Participation webpages as resources available 24/7;
• Publish an annual “Involving You” Tenant Report;
• Promote training opportunities as an incentive to encourage more tenants to
get involved;
• Continue membership of the West Dunbartonshire Equality Forum and
develop opportunities to promote tenant participation to wider groups;
• Feedback to tenants so that we can demonstrate where our tenants and
other service users have influenced or shaped the housing service
5. People Implications
5.1 There are no people implications from this progress report. There are 2 dedicated
staff members funded from the Housing Revenue Account, focused on the
development and delivery of tenant participation within the Housing Development
and Homelessness Team. In addition, supporting tenant participation is part of the
remit of all Housing and Homelessness staff. The strategy will therefore be
delivered with input from staff across all of Housing and Homelessness Services.
6. Financial and Procurement Implications
6.1 Actions required to take the Strategy forward in 2022/23 will be delivered from
within current budgetary provision which is reviewed on an annual basis.
6.2 There are no procurement implications.
7. Risk Analysis
7.1 The Council has a statutory responsibility to develop and implement a Tenant
Participation Strategy.  Our “Involving You” strategy reflects the priorities and
aspirations of tenants and tenant representatives, therefore there is a risk that if
its key aims are not met then this would produce an adverse reaction from
tenants, tenant representatives and from the Scottish Housing Regulator.
7.2 Our Tenant Participation Strategy builds on the achievements made in
developing good working relationships with tenants over the years, improving
transparency and a joint working approach to involving tenants. The continued
delivery of the strategy is therefore essential in demonstrating the Council’s on-
Page 112

Page 113

going commitment to continuous improvement across Housing Services and
putting tenants at the centre of our activities. 
8. Equalities Impact Assessment
8.1   An Equality, Health and Human Rights Impact Assessment was carried out as
part of the strategy’s development and found no substantive negative impacts.
This does not require to be updated in respect of this progress report.
9. Consultation
9.1 Regular Tenant Participation updates including the implementation of the
strategy are provided at the quarterly WDC/WDTRO Liaison meetings and the
minutes of these meetings are circulated to our Tenant & Resident Associations,
WDTRO members, as well as being publicly available on the Council’s webpage.
10. Strategic Assessment
10.1   The Tenant Participation Strategy is the overarching document setting out the
strategic direction for engagement with tenants and future tenants. The
implementation of the Tenant Participation Strategy will continue to support and
contribute greatly to all five of the Council’s key strategic priorities.
Peter Barry
Chief Officer, Housing and Employability
Date: 11 August 2022
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team: telephone 07793717981, email: john.kerr@west-
dunbarton.gov.uk
Appendices: 1. Tenant Participation Strategy 2021-2024 action plan
2. Tenant Participation Annual Performance Report
2021/22
Background Papers: Tenant Participation Strategy 2021-2024 ‘Involving You’
Tenant Participation Equality Impact Assessment 
Wards Affected: All
Page 113

Page 114

H&E - "Involving You" Tenant Participation Strategy 2021/24
Generated on: 13 July 2022
Report Layout: Housing Scorecard with Action and PI codes
Icon Name
1. We will improve the culture and practice of tenant participation across housing services
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/001
Continue to
deliver tenant
participation
training for all
housing services
staff
31-Mar-
2024
Explore developing elearn
modules on TP.
30-Jun-
2021
Yes Linked to action H/21-
24/TPS/035 Develop
an online training
section for tenants as
well as staff to access
Meeting with OD to
establish process for
getting learning
material put together
and made available
via elearn.
Material put together
and passed to OD to
create into elearn
material. Jane Mack
Deliver TP training to
housing staff during Year 1
of strategy.
31-Mar-
2022
Yes Delays in creating
training material has
meant formal TP
training not done in
year 1 but will be
available for year 2.
6/7/22 ilearn course
'What is Tenant
Participation?'
available for staff and
promoted thro intranet
noticeboard and
through coordinators.
Deliver TP training to 31-Mar- No
ITEM 11
APPENDIX 1
Page 114

Page 115

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
housing staff during Year 2
of strategy.
2023
Deliver TP training to
housing staff during Year 3
of strategy.
31-Mar-
2024
No
H/21-
24/TPS/002
Produce
quarterly TP
updates for
elected
members,
housing and
related services
staff to raise
awareness of TP
activities
31-Mar-
2024
Produce quarterly TP updates
in Year 1.
31-Mar-
2022
Yes 3 TP updates produced
and distributed -
April2021, August
2021 and March 2022.
Hanne Thijs 
Produce quarterly TP updates
in Year 2.
31-Mar-
2023
No Update June 2022
produced and sent out 
Produce quarterly TP updates
in Year 3.
31-Mar-
2024
No
H/21-
24/TPS/003
Record
outcomes from
involving
tenants and
publicise them
through the
Housing News
and other TP
communication
channels
31-Mar-
2024
Create an area on intranet
that completed toolkits can
be viewed by staff to assist
learning and improve impact
of future consultations.
29-Jun-
2021
Yes Tenant Participation
section of intranet
updated with toolkit
and examples of rent
setting and TP
Strategy consultation
summaries included.
Jane Mack 
Include article in Summer
2021 edition of Housing
News highlighting impact
that tenant consultation has
had on service delivery.
30-Jun-
2021
Yes Article included and
promotion of
consultations on
Allocation policy and
LHS included.
Include article in Summer
2022 edition of Housing
News highlighting impact
that tenant consultation has
had on service delivery.
30-Jun-
2022
Yes Summer edition full
but article held over
for Autumn edition.
Review the consultation
process, guide and toolkit.
31-Mar-
2023
No
Include article in Spring 2023
edition of Housing News
highlighting impact that
tenant consultation has had
30-Jun-
2023
No
Page 115

Page 116

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
on service delivery.
Ensure the Consultation
Toolkit is being used for all
consultations .
31-Mar-
2024
No
H/21-
24/TPS/004
Publish an
Involving You
annual report
each year
31-Mar-
2024
Design and publish an
Involving You annual report
Year 1.
31-May-
2022
Yes Report produced and
published on website
as well as circulated to
TRA,s and included in
papers for
WDC/WDTRO Liaison
meeting 23 June
2022. Jane Mack 
Design and publish an
Involving You annual report
Year 2.
31-May-
2023
No
Design and publish an
Involving You annual report
Year 3.
31-Mar-
2024
No
Icon Name
2. We will improve our feedback to tenants so that we can demonstrate where our tenants and other service users have influenced or shaped the housing service
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/005
When consulting
with tenants we
will tell them
how their views
will be used and
how decisions
will be made
31-Mar-
2024
Consultation toolkit for
rent setting 2021/22
completed and
submitted with Rent
setting Council report
3/3/21.
Create and promote annual
consultation calendar for
2021/22.
30-Apr-
2021
Yes Complete - Website
update with calendar
16/4/21.
Jane Mack 
Create and promote annual
consultation calendar for
2022/23.
30-Apr-
2022
Yes Website updated with
calendar for 2022/23 
Create and promote annual
consultation calendar for
2023/24.
30-Apr-
2023
No
Ensure that Consultation
toolkit is completed for each
consultation exercise which
sets out how tenants are
advised how their views will
31-Mar-
2024
No
Page 116

Page 117

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
be used and when decisions
will be made.
H/21-
24/TPS/006
Outcomes from
consultations
will be
communicated
to participants
and will be
publicised via
the Housing
News, webpages
and social media
31-Dec-
2023
Outcomes of consultations in
2021 will be feedback
directly to respondents
where possible and publicly
through the HN. Webpages
and social media.
31-Dec-
2021
Yes Outcome of Rent
setting consultation
21/22 reported in
Spring HN 2021.
Summer HN used to
promote Allocation
policy review and LHS
consultation.
Winter HN used to
promote rent setting
consultation.
Jane Mack  Outcomes of consultations in
2022 will be feedback
directly to respondents
where possible and publicly
through the HN. Webpages
and social media.
31-Dec-
2022
No
Outcomes of consultations in
2023 will be feedback
directly to respondents
where possible and publicly
through the HN. Webpages
and social media.
31-Dec-
2023
No 
H/21-
24/TPS/007
Support TRAs to
demonstrate
their
achievements
locally
31-Mar-
2024
TP Dev officer will work
closely with TRAs to support
their activities and highlight
their achievements through
TP updates and Housing
News.
31-Mar-
2024
Yes Posters/flyers
produced and
distributed with local
groups to
support/highlight their
achievements. Regular
HN articles about
group activities.
Regular public
meetings of groups to
highlight their
activities and
achievements.
Hanne Thijs 
H/21-
24/TPS/008
Publish annual
31-May-
2023
Use annual TP performance
report to highlight outcomes
of tenant involvement in Year
31-May-
2021
Yes Annual TP
performance report
compiled and issued to
Jane Mack
Page 117

Page 118

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
tenant
involvement
outcomes as
part of TP
performance
report
1. all TRA's, and
published on webpage
and FB.
Use annual TP performance
report to highlight outcomes
of tenant involvement in Year
2.
31-May-
2022
Yes Annual TP
performance report
created and issued to
all TRA's, presented at
WDC/WDTRO Liaison
meeting (23/6/22)
and published on
webpage .
Article for Autumn HN
created focusing on
tenant impact and
promoting report.
Use annual TP performance
report to highlight outcomes
of tenant involvement in Year
3.
31-May-
2023
No
H/21-
24/TPS/009
Demonstrate the
outcome(s) of
tenant
involvement in
tenant scrutiny
activities
31-Mar-
2024
Scrutiny Panel final reports,
once agreed by HIB , should
be published on TP webpages
and promoted through TP
updates, HN , FB to promote
recommendations and their
positive impact.
31-Mar-
2024
No Scrutiny Panel report
on Complaints
Handling process
agreed at HIB Oct
2021. Report
published on TP
webpages and article
on Panel's report
included in winter
2021 HN edition.
Jane Mack 
H/21-
24/TPS/010
Support tenants
and TRA
representatives
to review papers
going to the
HAC Committee
and encourage
them to
participate in the
Pre-HACC Forum
31-Mar-
2024
Advertise and promote
quarterly Pre-HACC Forums,
support tenants to
understand committee
reports and keep Pre-HACC
Forum section on TP website
up to date in year 1.
31-Mar-
2022
Yes Regular attendance at
Pre-HACC meetings
sustained despite
continuing to be
virtual. Paper copies of
committee papers
provided to assist
attendance and
discussion.
Jane Mack 
Advertise and promote
quarterly Pre-HACC Forums,
support tenants to
31-Mar-
2023
No
Page 118

Page 119

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
understand committee
reports and keep Pre-HACC
Forum section on TP website
up to date in year 2.
Advertise and promote
quarterly Pre-HACC Forums,
support tenants to
understand committee
reports and keep Pre-HACC
Forum section on TP website
up to date in year 3.
31-Mar-
2024
No
Icon Name
3. We will promote and provide a wide range of options for tenants to get involved with us.
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/011
Promote the
range of options
and support in
place to
encourage
tenants to get
involved
31-Mar-
2024
Update TP webpages to
emphasis support available.
28-Feb-
2022
Yes Webpages updated
4.3.2022
Hanne Thijs 
Use HN to promote the range
of options and support
available in Year 1.
31-Mar-
2022
Yes Shorter HN Spring
2022 due to elections.
Article in HN Summer
2022 
Use HN to promote the range
of options and support
available in Year 2.
31-Mar-
2023
No
Use HN to promote the range
of options and support
available in Year 3.
31-Mar-
2024
No 
H/21-
24/TPS/012
Produce a leaflet
version of the TP
Strategy 2021-
2024 to make
the TP Strategy
more accessible
and user-
31-Oct-
2022
Design and publish a leaflet
version of TP Strategy.
31-Oct-
2022
No Timescales for this
action were amended
due to no public
access points being in
operation over the
course of the
pandemic.
Jane Mack 
Make housing staff aware of
leaflet.
31-Oct-
2022
No
Page 119

Page 120

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
friendly Promote leaflet through HN . 31-Oct-
2022
No
Update TP webpages with
leaflet.
31-Oct-
2022
No
H/21-
24/TPS/013
Support TRAs to
produce leaflets
and or websites
promoting the
work that they
do and how to
get involved
31-Mar-
2024
Provide relevant support in
Year 1.
31-Mar-
2022
Yes Leaflets and flyers
created for local
groups to promote
their activities and
groups Hanne Thijs
Provide relevant support in
Year 2.
31-Mar-
2023
No 
Provide relevant support in
Year 3.
31-Mar-
2024
No
H/21-
24/TPS/014
Continue to
deliver an
annual tenant
conference or
event
31-Mar-
2024
Consult with WDTRO and
plan suitable event in Year 1
31-Mar-
2022
Yes Due to ongoing
concern regarding
covid pandemic a
tenant conference not
going to be delivered
in year 1.
Situation will continue
to be monitored as
well as communication
with WDTRO, and a
tenant event planned
when suitable.
Jane Mack;
Hanne Thijs
Consult with WDTRO and
plan suitable event in Year 2
31-Mar-
2023
No
Consult with WDTRO and
plan suitable event in Year 3
31-Mar-
2024
No 
H/21-
24/TPS/015
Explore new
methods to
provide
information and
obtain tenants’
views (social
media, IHMS)
30-Nov-
2023
Explore and implement new
methods to provide
information and obtain
tenant views in year 1-
2021/22
30-Nov-
2021
Yes Tenant Satisfaction
Survey shows letters
and newsletter are
most accessed forms
of information. Social
media (Facebook) only
used by approx.
17.5% of tenants for
information.
Hanne Thijs
Page 120

Page 121

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
IHMS text option
successfully used to
promote rent setting
consultation.
Explore and implement new
methods to provide
information and obtain
tenant views in 2022/23
30-Nov-
2022
No
Explore and implement new
methods to provide
information and obtain
tenant views in 2023/24
30-Nov-
2023
No
H/21-
24/TPS/016
Develop a digital
hub,
mightynetworks
as a more
interactive and
accessible option
to increase
tenant
participation
31-Mar-
2022
Create profile and pay for
community membership.
01-Apr-
2021
Yes 15/4/21 Mighty
network account
created.
Hanne Thijs
Develop promotional material
to encourage tenants to use.
31-Jan-
2022
Yes Platform being
developed to pilot with
Scrutiny Panel to
ensure right info and
interaction so due
date been changed to
allow time to finesse
before promoting.
Meeting on 7 April
2022 to show Scrutiny
Panel Mighty
networks. Complete
Review how tenants are
using platform and if
effective.
31-Mar-
2022
Yes Complete - platform is
being used
predominantly by the
Scrutiny Panel and
effectiveness will
improve over time.
Aim will be to extend
use as appropriate.
H/21-
24/TPS/017
Develop use of
hybrid meetings
31-Dec-
2022
Assess hybrid meeting
capacity and facilities at
Church Street.
30-Aug-
2021
Yes Contact made with OD
and meeting room
hybrid capacity being
developed but no
Jane Mack
Page 121

Page 122

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
as option for
people with
limited time as
well as for those
with mobility
issues as an
attractive option
to get involved
from comfort of
own home
plans for public access
to buildings yet. 
Assess hybrid meeting
capacity at other possible
meeting venues (e.g.
Dalmuir community centre).
31-Aug-
2021
Yes Dalmuir Community
Centre and Concorde
in Dumbarton are
available for let but no
wifi. Discussed with
WDTRO and they
happy to stay with
remote meetings while
Covid figures are still
high. Reviewed
monthly at their
committee meetings.
Promote hybrid meeting as
an option to encourage new
involvement via HN, TP
updates and TP webpages.
31-Dec-
2022
No Unable to complete
until there are
meeting rooms
available. Being
monitored on monthly
basis. Demand for a
hybrid option for
meetings will continue
to be discussed with
tenants and tenant
groups and kept under
review and
appropriate
arrangements made
when rooms are made
available. 
H/21-
24/TPS/018
Promote the
personal as well
as community
benefits of
getting involved
/ volunteering
31-Oct-
2021
Promote personal as well as
community benefits of
getting involved /
volunteering in new leaflet.
30-Sep-
2021
Yes Leaflet created
30.9.2021
Leaflet will be used at
in-person events
Hanne Thijs 
Promote personal as well as
community benefits of
getting involved /
volunteering in HN .
22-Oct-
2021
Yes Article written for
Winter HN, submitted. 
H/21-
24/TPS/019
Embed
31-Mar-
2024
Re establish walkabouts
when COVID restrictions
allow.
30-Nov-
2021
Yes 27 Oct Commitment
from Housing to do
walkabouts
Hanne Thijs
Page 122

Page 123

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
walkabout
process for
tenants to
inspect their
local area and
produce action
plans for
improvements
along with
Housing staff
29 Oct - groups
provided with
feedback from initial
staff only walkabouts
Walkabouts promoted
in Winter Newsletter
commitment from
Housing ops to imbed
walkabout process for
tenants.
Assess use of recording
sheets so all parties aware of
agreed actions.
31-Mar-
2022
Yes Recording sheets
provided to groups for
use.
Ensure updates on
walkabouts are given to help
demonstrate the positive
outcomes.
31-Mar-
2024
Yes Manager of Housing
Operations continuing
to remind staff to
provide updates.
Liaison meetings being
used to remind staff of
this commitment.
Icon Name
4. We will encourage involvement of under- represented groups such as young people, homeless people, people with disabilities and minority ethnic groups.
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To 
H/21-
24/TPS/020
Explore
opportunities to
develop a youth
housing forum
to involve
tenants aged
16-25
31-Aug-
2021
Speak to local authority and
third sector organisations
who work with young people.
30-Aug-
2021
Yes 6/9/21 meeting held
with members of WD
Youth Development
team to identify
opportunities to
involve young people.
Future meetings
planned with Youth
Alliance .
Hanne Thijs
Explore what other local
authorities are doing.
31-Aug-
2021
Yes Online research
completed Sept
21/9/2021 Email to
TIS for info on LAs
who are involving
Page 123

Page 124

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
young people well. TIS
are conducting
research into this
currently.
Attended presentation
from South
Lanarkshire Council on
their work with young
people.
H/21-
24/TPS/021
Explore
opportunities to
link up with local
youth groups
like YSORTIT,
Youth Council to
raise awareness
of participation
opportunities
31-Dec-
2022
Consider what programmes
already exist where TP could
be added.
06-Sep-
2021
Yes 6/9/21 discussion with
members of WD Youth
Dev team to explore
opportunities for TP
involvement in youth
groups.
Hanne Thijs 
Open discussion with staff
and young people at local
youth groups.
31-Dec-
2021
Yes 06/9/21 discussion
with members of WD
Youth Dev team to
explore opportunities
for TP involvement in
youth groups.
11/8/21 email to
Ysortit and to
Champions board
coordinators and
follow up meeting.
They will consider
options.
Sep 2021 - feedback
from partners
suggesting that no
real demand for any
new specific structures
to be developed to
encourage
involvement of young.
Other mechanisms of
communication will
continue to be
reviewed, for example
developing social
Page 124

Page 125

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
media and other
electronics means of
communication.
Create information and
develop different ways to
deliver this to youth groups.
31-Dec-
2022
No 5/22 Information
poster created and
shared with youth
groups via social
media, email and
WDCVS. Will continue
to explore use of other
communication tools
which may encourage
involvement.
H/21-
24/TPS/022
Explore
opportunities to
develop a forum
for people in
temporary/supp
orted
accommodation
31-Mar-
2024
Consider what other local
authorities do.
30-Nov-
2022
Yes  There does not
appear a considerable
amount of positive
activity in this area
across Scotland.
Hanne Thijs Open discussion with staff at
supported
accommodation/and
homeless team.
31-May-
2023
No
Implement strategy as
appropriate.
31-Mar-
2024
No 
H/21-
24/TPS/023
Consult and
offer dialogue
opportunities
with tenants at
Dennystoun
Forge in a way
they are
comfortable with
31-May-
2022
Use the Scottish Government
site funding as start of
dialogue and to introduce TP
staff.
31-May-
2021
Yes Consultation visit
carried out on 26/5/21
and views on how to
spend the
improvement fund
collated. Ideas passed
to Repairs to cost up.
Update letter sent to
tenants 7/9/21 as
awaiting costs.
Hanne Thijs
Assess how Dennystoun
Forge tenants want
information to be shared with
them.
31-May-
2022
Yes Following discussions,
tenants prefer in
person visits, phone
calls or letters.
Assess how Dennystoun
Forge tenants want to be
31-May-
2022
Yes To be reconsidered
once site is up to
Page 125

Page 126

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
involved. standard. Tenants
currently wish for site
to be brought to
standard. 
H/21-
24/TPS/024
Continue
membership of
West
Dunbartonshire
Equality Forum
and develop
opportunities to
promote tenant
participation to
wider groups
31-Mar-
2024
TP Staff to regularly attend
Equality Forum and engage
as appropriate in year 1.
31-Mar-
2022
Yes Regular attendance at
Forum quarterly
meetings .
Jane Mack
TP Staff to regularly attend
Equality Forum and engage
as appropriate in year 2.
31-Mar-
2023
No 
TP Staff to regularly attend
Equality Forum and engage
as appropriate in year 3.
31-Mar-
2024
No
H/21-
24/TPS/025
Develop links
with support
charities to
promote TP as
an option for
people to do
online (even
post COVID
pandemic)
31-Mar-
2024
Identify support charities
operating in WD.
30-Nov-
2023
Yes Met with Champions
Board (care leavers)
staff to discuss joint
projects
Meeting with learning
disability charity July
2022 to discuss
opportunities. 
Meeting with
Alternatives (drug and
alcohol) to discuss co-
use of TRA community
space July 2022
Jane Mack 
Approach and promote to
these support charities the
options that TP can provide.
31-Mar-
2024
No
Use Equality Forum to
promote TP as an option for
people to do online.
31-Mar-
2024
No
H/21-
24/TPS/026
Provide
additional
support for
people with
31-Oct-
2023
Research agencies in WDC
who could provide support or
advice to tenants and/or
staff.
31-Mar-
2023
No Meeting with
Neighbourhood
Network (learning
disability) regarding
possible joint work
July 2022
Jane Mack
Page 126

Page 127

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To 
learning
difficulties and
make that clear
on any
information
about training
and on
webpages
Make clear on webpages and
printed materials that
additional support is
available.
31-Oct-
2023
Yes Article in Summer
2022 HN to make
clear support
available.
Leaflet produced to
highlight support
available.
Facebook page being
used to publicise
leaflet and support
options available.
Make clear on webpages and
printed materials that
additional training is
available.
31-Oct-
2023
Yes TP staff at WDTRO
committee meetings
highlight training
available.
TP staff at TRA
meetings highlight
training available.
Facebook page being
used to publicise
training available.
Training provided
following request from
Scrutiny Panel (May
2022)
Icon Name
5. Ensure tenants are aware of the options available to them to shape housing service plans and budgets
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/027
Produce and
promote an
annual
consultation
calendar
30-Apr-
2023
Create and promote annual
consultation calendar for
2021/22.
30-Apr-
2021
Yes Complete - Website
updated with 2021/22
consultation calendar
16/4/21.
Jane Mack Create and promote annual
consultation calendar for
2022/23.
30-Apr-
2022
Yes Website updated with
consultation calendar
for 2022/23
Create and promote annual 30-Apr- No
Page 127

Page 128

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
consultation calendar for
2023/24.
2023
H/21-
24/TPS/028
Carry out an
annual
consultation on
rents increases
and provide
clear information
for tenants to be
able to make
informed choices
31-Jan-
2024
Review the rent setting
information with JRG and use
any feedback from previous
year’s consultation to ensure
rent information is as clear
as possible.
30-Sep-
2021
Yes Suggested changes
from tenants about
wording passed onto
Janice Rainey.
Jane Mack
Carry out an annual
consultation on rent
increases 2022/23
30-Jan-
2022
Yes Public consultation
carried out and
preferred option from
survey put forward as
rent setting for
2022/23. Council
decision taking place
on 9/2/22. 
Review the rent setting
information with JRG and use
any feedback from previous
year’s consultation to ensure
rent information is as clear
as possible.
30-Sep-
2022
No
Carry out an annual
consultation on rent
increases 2023/24
30-Jan-
2023
No
Review the rent setting
information with JRG and use
any feedback from previous
year’s consultation to ensure
rent information is as clear
as possible.
30-Sep-
2023
No
Carry out an annual
consultation on rent
increases 2024/25
30-Jan-
2024
No
H/21-
24/TPS/029
Develop tenant
involvement in
Housing
Revenue
30-Apr-
2023
Facilitate JRG to use SHN
toolkit to review WDC HRA
compliance.
29-Apr-
2021
Yes Complete -
assessment of
compliance carried out
and report on
completed exercise
provided to HIB
Jane Mack
Page 128

Page 129

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Account scrutiny
and work
towards full
compliance with
the Scottish
Government’s
2014 HRA
Guidance
26/4/21 
Create action plan for JRG to
focus on areas not fully
compliant.
30-Apr-
2021
Yes Complete - Action plan
approved by HIB on
26/4/21 and assigned
officers to implement
agreed actions.
Regular feedback to
be provided to JRG
and HIB.
Complete action plan to
satisfaction of JRG that are
fully compliant.
30-Apr-
2023
No 
H/21-
24/TPS/030
Develop tenant
involvement in
the decision –
making process
of setting rents,
Capital
Programmes and
agreeing
Business Plans
30-Sep-
2023
Involve tenants in pre-rent
setting discussions about
Capital programme setting
and agreeing business plan
01-Sep-
2021
Yes Decision making
matrix been shared
with JRG to help
identify where
increased tenant
involvement in
decision -making could
be introduced.
Meeting with tenant
volunteers from JRG
took place on 13/8/21
to start tenant
involvement in rent
setting. Focus of
meeting was to
identify tenant
priorities and further
meeting to explore
energy efficiency
options to take place
in Sept.
Jane Mack
Complete HRA compliance
action plan to ensure full
compliance
30-Sep-
2022
No HRA compliance plan
self assessment
exercise undertaken
and officers and
tenant representatives
working towards full
compliance within
revised timeframe. 
Page 129

Page 130

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Develop use of revenue and
capital matrix by JRG
31-Aug-
2022
No Revenue and Capital
Budget matrix been
created for JRG.
Revenue matrix being
used with void budget
as an example to
demonstrate the use
of the matrix - been
rescheduled to 18
August JRG meeting.
Involve tenants in pre-rent
setting discussions about
Capital programme setting
and agreeing business plan
30-Sep-
2022
No
Involve tenants in pre-rent
setting discussions about
Capital programme setting
and agreeing business plan
30-Sep-
2023
No
Icon Name
6. Assess our performance in line with the Scottish Social Housing Charter and involve tenants in our annual Tenant Report.
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To 
H/21-
24/TPS/031
Agree with
tenants what
Charter
indicators they
want included in
the Tenant
Report
31-Mar-
2024
Following review of Charter
Indicators by the Scottish
Social Housing Regulator,
establish a short-term
working group to review
performance indicators to be
included in annual tenant
report
01-Jun-
2023
No  Action not yet
commenced.
Jane Mack 
H/21-
24/TPS/032
Review the best
style to use to
ensure the
report is
31-Mar-
2024
Advertise for volunteers for
short working group
28-Feb-
2023
No  Action not yet
commenced.
Jane Mack  Following review of Charter
Indicators by the Scottish
Social Housing Regulator,
establish a short-term
31-Mar-
2023
No  Action not yet
commenced.
Page 130

Page 131

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
accessible and
easy to
understand
working group to review
performance indicators to be
included in annual tenant
report
Implement proposals from
tenant working group in
terms of style and format to
inform Charter Performance
Report due to be published
October 2023.
01-Jun-
2023
No  Action not yet
commenced.
H/21-
24/TPS/033
Support scrutiny
activity by
offering formal
training for staff
and tenants
taking part
31-Mar-
2024
Create briefing note from
staff on role of Scrutiny
Panel and WDC commitment
to it
31-Mar-
2022
Yes Briefing note created
and presented to HIB
30 5 22 and to be
circulated to staff by
managers.
Jane Mack 
Stepping up to Scrutiny
training to be completed with
any new Panel members
31-Mar-
2024
No Stepping up to
Scrutiny training
updated March 2022
and ready for new
Panel members.
Training for new Panel
member and refresher
for existing members
carried out on 9 May
2022 
H/21-
24/TPS/034
Recruit new
members onto
the WD Scrutiny
Panel
31-Mar-
2024
Advertise and recruit new
Scrutiny Panel members Y1
31-Mar-
2022
Yes Spring 21 HN featured
Panel members in ‘On
the Spot’ article to
raise awareness.
Autumn 21 HN
included article on
Panel's latest scrutiny
report on complaints
handling process.
New member
recruited, attended
first Panel meeting on
4/3/21 and training to
commence.
Jane Mack
Advertise and recruit new
Scrutiny Panel members Y2
31-Mar-
2023
No
Page 131

Page 132

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Advertise and recruit new
Scrutiny Panel members Y3
31-Mar-
2024
No
Icon Name
7. Ensure that the resources we put in place and practices we carry out are adequate to support and develop tenant participation activity
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/035
Develop an
online training
section for
tenants as well
as staff to
access
30-Jun-
2022
Assess with Organisational
Development/ICT potential
for creating online learning
that staff and tenants can
access.
30-Sep-
2021
Yes Meeting held with OD
( 27/7/21)and is
potential for
developing elearn
modules for staff.
Tenants can't get
access but option to
share with tenants
through links on TP
webpages to be
explored.
Jane Mack 
Develop content for training 30-Apr-
2022
Yes Content developed
and been created into
a draft ilearn course
ilearn course been
produced that staff
can access - the
platform used can't be
accessed from public
WDC website so
alternative options
being explored.
Advertise training available
through HN, FB and TP
Updates
30-Jun-
2022
Yes Ilearn module agreed
at HIB 27/6/22 and
ready for staff to use.
Promoted on intranet
noticeboard and
through co-ordinators.
Doesn't allow external
access so a tenant
option still to be
developed.
Page 132

Page 133

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/036
Promote training
opportunities as
an incentive to
encourage more
tenants to get
involved
31-Aug-
2023
Promote training
opportunities Y1
31-Aug-
2021
Yes Article on personal
benefits of
participating including
training opportunities
included in winter HN.
Jane Mack 
Promote training
opportunities Y2
31-Aug-
2022
No 
Assess take up of training
and develop new
opportunities
31-May-
2023
No
Promote training
opportunities Y3
31-Aug-
2023
No
Icon Name
8. We will ensure we communicate effectively with tenants and provide good quality, accessible information that tenants want
Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
H/21-
24/TPS/037
Review and
improve the
content on the
TP web pages
and use of social
media
31-Jan-
2023
Analyse FB interaction 31-Aug-
2022
Yes  Ongoing Review
Hanne Thijs 
Analysis website traffic and
identify areas most used and
those not.
31-Aug-
2022
No 
Ask tenants give feedback on
website and FB page
31-Oct-
2022
No
Make recommended
changes.
31-Jan-
2023
No
H/21-
24/TPS/038
Promote TP
webpages as
resources
available 24/7
30-Jun-
2023
Once improvements have
been made, promote
webpages
30-Jun-
2023
No Action not yet
commenced
Jane Mack 
H/21-
24/TPS/039
Continue to
produce regular
31-Mar-
2024
Produce and deliver 4
editions of Housing News
during 2021/22
31-Mar-
2022
Yes 4 editions produced .
Jane Mack 
Produce and deliver 4 31-Mar- No
Page 133

Page 134

Code & Title Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
editions of the
Housing News to
all tenants
keeping them up
to date with
housing
investment,
service
developments
and outcomes
from
consultations
editions of Housing News
during 2022/23
2023 
Produce and deliver 4
editions of Housing News
during 2023/24
31-Mar-
2024
No
H/21-
24/TPS/040
Assess interest
in a Reader’s
Panel as a way
of making sure
communication
is clear,
accessible
information that
tenants want
31-Dec-
2022
Research other LA/RSL
Reader’s Panels
31-Oct-
2022
No  Ongoing
Hanne Thijs
Contact interested tenant
register and FB for potential
members
30-Nov-
2022
No 
If interest, set up group 31-Dec-
2022
No
H/21-
24/TPS/041
Assess interest
in creating an
editorial group
with tenants to
develop Housing
News
31-Mar-
2024
Once Readers panel
established, assess interest
in focus on HN.
01-Apr-
2023
No  Action not yet
commenced
Jane Mack
H/21-
24/TPS/042
Review and
update Tenant
Communication
Strategy
31-Mar-
2024
Set up working group of
housing staff to review
current strategy
01-Apr-
2023
No  Action not yet
commenced
Jane Mack  Assess link in with wider
Council communication
strategy and Digital strategy
01-Oct-
2023
No
Develop a new updated
communication strategy
31-Mar-
2024
No
Page 134

Page 135

Action Status
Cancelled
Overdue; Neglected
Unassigned; Check Progress
Not Started; In Progress; Assigned
Completed
PI Status
Alert
Warning
OK
Unknown
Data Only
Long Term Trends
Improving
No Change
Getting Worse
Short Term Trends
Improving
No Change
Getting Worse
Risk Status
Alert
High Risk
Warning
OK
Unknown
Page 135

Page 136

Tenant Participation performance
report 2021/22
12 Tenant & Resident
Associations (2 new
groups set up}
� ©'k�@'IH�"®©I W
@fflffl�lf$
3
c,onsultatlons
completed
230 followers on
Facebook -up from
185 last year
-��@lfi)
��
��
��
PAS
otland
GOLD ACCREDmD
FOR EXCELLENCE IN
TENANT PARTICIPATION
1 scn.oto roy
e�eirdse
t(Q)mp�eitecdJ
cd]u�otai��v airodl roew
memlbeir j©uroecd]
Sccn.otoroy IPairoe�
Sccn.oton1y !Pane� fona�osts
00"0 C�H Awairds f©ir
4
M©st �O"OS!P)DlrDD"Ilg
Scnntoroy Pai0'1le�'
ITEM 11 APPENDIX 2
Page 136

Page 137

Introduction 
Our Tenant Participation Strategy ‘Involving You’ sets out how we support and promote tenant
involvement in West Dunbartonshire. This report is to outline progress made in the last year and
highlight the input tenants have had in decisions and service improvements. 
The ongoing disruption caused by the COVID 19 pandemic continued to affect tenant participation
as well as many other housing services. In these disrupted times it has become even more obvious
how important good communication is and TP staff continued to be available by mobile phone and
via email so that contact with tenant groups was maintained successfully. The resilience and
enthusiasm of our tenant groups was remarkable and most have continued their activities
throughout this disrupted period. 
Regular meetings continue on Zoom and we have all got more used to using it and these virtual
meetings can be as effective as they are face to face. The WDTRO have continued to meet
monthly and the bi-monthly WDC/WDTRO Liaison meetings have continued on Zoom to ensure
that tenants still had opportunities to raise issues with housing managers and the Housing
Convener at such a critical time. 
Key highlights 
1. Continued good response from tenants in rent setting consultation 
Despite the continuing impacts of the pandemic and the consultation
taking place remotely, we still had a significant number of tenants
having their say on rent setting.  A total of 1089 tenants voted for their
preferred rent option as part of the consultation - down from 1344 last
year but still an 11% response rate.  Again it all had to be done virtually
but a range of voting options were offered to make it as easy as
possible for all tenants.  A public meeting and presentation was still
carried out but done as a virtual meeting on Zoom.
Keeping the rent increase as low as possible had been the clear message from tenants so the
options offered all related to a 2% rent increase but gave different ways of spending the money. 
All tenants were encouraged to vote for their preferred option with a direct mailing to them and a
range of voting methods offered– free-post voting card, online survey, texting and email options. 
The vote was close but Option 2 (retain a Tenant Priority Budget of £400,000 and use other
£400,000 to accelerate External Wall Insulation programme) received the most votes, 35.7% and
this option was then approved by the Council in February 2022.
Over previous years we have encouraged tenants to get involved and influence this vital decision
so although the response rate was less than last year, considering all that is going on in the world it
is still a clear sign that tenants do want to have their say and how important rent issues are for so
many people. 
Option 1 31.6%           344
Option 2 35.7%           389
Option 3        32.7%           356
Total                               1089 
Page 137

Page 138

2. Tenant Priority Budget 
This is an annual £800,000 budget, set aside for tenant priorities. There are set criteria on how this
Budget can be used and it is tenants who decide what proposals are value for money and should go
ahead which is done through public meetings. 
Due to ongoing backlogs in Repairs, there were a number of delays in getting proposals costed up
and then carried out.  We also received a reduced number of proposals but 12 proposals were
completed with only £18,784 of this budget spent in the last financial year.  This included fencing at
Craigielea Road, solar lights for Drumry community garden and repainting parking lines at Littleholm. 
There is £36,692 worth of work still to be completed and being pursued with the Repairs teams.
These include repainting parking lines and lock-up doors at Westbridgend, redesign drying area at
Kilbowie Court and painting columns and rails in Hood Street. 
We will continue to promote the Tenant Priority Budget, as it’s a great opportunity for tenants to see
improvements being done in their area.  We also want to use it to encourage local walkabouts and
focus on tenant priorities identified there. 
3. Communication 
We have continued to produce TP updates for tenant representatives, elected members and staff to
maximise awareness of tenant participation activities and encourage them to increase tenant
involvement- Tenant Participation Updates | West Dunbartonshire Council 
The Housing News is produced quarterly and delivered to all tenants,
as well as future tenants living in temporary accommodation. Housing
staff also receive an electronic version.  We try to make the Housing
News as interesting as possible for tenants and promote different
ways to get involved.  TRAs also continue to use the Housing News to promote their activities and
we include as much community news as possible.  The chairperson of the WDTRO also has a
regular column and uses it to highlight tenant issues and encourage tenant involvement. 
We have a regular reader’s quiz to encourage people to read the Housing News and use the
contact with the winners as an opportunity to get their opinion on the Housing News and see if they
want to get more involved. 
4. Online and Facebook 
We continually review the content of our TP webpages  Tenant participation | West Dunbartonshire
Council and update it with meeting notes from the Joint Rent Group, WDC/WDTRO Liaison
meetings and Pre HACC Forum so that  tenants can get access to this information at a time that
suits them. 
@WestDunbartonshireCouncilTenantParticipation - we now have 230 followers on
Facebook and post at least 3/4 times a week with information we hope is relevant to
tenants. Our FB page continues to attract new readers (up from 185 last year) and is a
valuable mechanism for sharing information and encouraging engagement. TRA’s also make good
use of Facebook and Tullichewan TRA have 414 followers which is impressive. New TRA’s are
also using Facebook to help promote their set up and meetings. 
Page 138

Page 139

5. Tenant involvement in shaping and improving Housing Services 
Our Joint Rent Group (JRG) has continued to meet every month.  The group includes tenant
volunteers, housing and finance staff, as well the Housing Convener.  They have been improving
transparency about the HRA budget setting and assessing where tenants could be more involved
in these key financial decisions.  Regular updates on the Capital Programme are shared with the
group, following their concerns about the effectiveness of the programme and its ability to keep
tenant’s homes up to standard.  The group are also looking at the void budget which continues to
grow but tenant satisfaction with the standard of properties has dropped which raised concerns
over value for money. 
The Pre-HACC Forum is another opportunity that tenants have to influence decisions made by the
Housing and Community Committee.  The Forum takes place two days before the Housing and
Communities Committee meets and tenants can meet the Housing Convener and staff who have
written the papers that are going to committee - the Housing Convener then feeds tenants’ views
into the committee discussions.  These meetings too continued on Zoom and had regular tenant
attendance throughout the year.  Paper copies of the committee reports, which can be lengthy and
more difficult to read on small devices, were delivered to attendees to assist discussions. 
WDC/WDTRO Liaison meetings take place every 2 months and continues to be a good example
of effective partnership working, as the WDTRO and staff can add to the agenda and the WDTRO
chairperson and Housing Convener take turns chairing the meetings.  Minutes are then shared
with all TRAs and posted on TP council webpages. 
Holding the Council to account is an important function of tenant participation and it ensures that
we can improve services for all tenants.  The WDTRO have raised a number of concerns over the
last year which has resulted in improvements that all tenants can benefit from, these included: 
• Concerns about getting through to Repairs on the phone continued to be raised and call
handling performance information has been monitored at these meetings. This has helped the
contact centre focus on improving the service and waiting times have been reduced. The
WDTRO have asked for the call handling performance information to carry on being shared at
these meetings to ensure this performance improvement continues.
• Ongoing delays in repairs being carried out in multi-storey flats to fire doors and landings has
resulted in the repairs service creating a dedicated team of staff to specialise in the flats, to
build up expertise as they all have different specifications and some unique features.  There
have been delays in getting the specialist training needed for the staff but it is hoped this
service will launch soon and progress will continue to be reported to the Liaison meetings.
• The Council’s performance against the Charter outcomes is regularly monitored, as well as
updates on the Charter action plan aimed at improving performance.
• The WDTRO have also raised specific questions about progress in addressing the repairs
backlog and general repair performance and this will remain a standing agenda item until all
are satisfied that progress is being made.
• Following the Housing Officers temporary change to operating in functional teams, the
WDTRO raised concerns about difficulties in being able to contact the right officer and this
resulted in improvements to information on the Council’s webpages and information being
included in the Housing News to help explain the situation.
• The WDTRO flagged concerns about the practice of outgoing tenants being told to put the
keys through the door and for the door to then be forced open.  When restrictions were lifted
this was an unnecessary expense and the practice stopped and continues to be monitored by
managers. 
Page 139

Page 140

7.  Scrutiny Panel progress. 
The Scrutiny Panel have continued to work throughout the last year via Zoom and Rita Howard,
their chairperson presented their report and recommendations on the Complaints process to the
Housing Improvement Board on 25/10/21. All their recommendations were accepted and are being
implemented. 
The Scrutiny Panel were successful in being shortlisted for a prestigious CIH excellence award
and narrowly missed out but it was a great national acknowledgement of the work that they do to
ensure that tenant scrutiny is a valued part of WDC’s performance management. 
While the Council finalises its Charter performance information reporting for 2021/22, the Panel
are doing 2 short scrutiny exercises looking at new tenant visits and reviewing how easy the
Council’s website is to use. 
The Panel also have a new member and training for them and refresher training for existing
members took place recently in Clydebank Town Hall.  The Panel have been embracing hybrid
meetings as some prefer to meet in person while keeping the flexibility of an online option and TP
staff have supported them in doing that. 
8.  Tenant Participation Budget - £ 56,211.34 spent in 2021/22 
We have a TP budget of £75,395 and spent £56,211.34 of our budget, which is slightly up from
last year as more activities took place but still less than ‘normal’ years, mainly due to reduced
expenses and less running costs for tenant groups.  Our Budget enables us to financially support
12 TRAs, the WDTRO, Sheltered Housing Forum, Pre-HACC Forum and Scrutiny Panel to help
them function effectively and as independently as possible. 
The cost of producing the Housing News also comes out of our Tenant Participation Budget and
this takes up the majority of our communication costs.  4 TRAs have community flats that they
operate from and the running costs for these are included in the costs for supporting TRA’s, along
with annual top up grants to cover their administration costs to support their functioning.  Public
liability insurance is also paid for each active TRA. 
Due to Covid restrictions, we made savings in relation to catering, paying transport costs to and
from meetings, as well as reduction in many running costs for TRA’s while they remained closed. 
This year did create some new general costs for us in relation to ensuring that groups had
computer and printing equipment as well as our Zoom license.  We have had a TPAS membership
for a number of years and last year also took out a TIS membership – they are another national
tenant participation organisation and been very proactive in providing good digital participation
advice so we have renewed that too. 
A breakdown of our spending and comparison with the previous year is shown below: 
Page 140

Page 141

9.  Training 
Training opportunities were still limited this year but the following good online events were attended: 
• Coaching confidence in communication for tenants.
• Scrutiny learning session run by TIS.
• Staff member completed TPAS certificate in TP and Community Development.
• Rent setting and affordability session run by TIS.
• WDTRO member attended Housing Engagement and Energy Efficiency Zero Ambitions
run by TIS. 
10.  Volunteering hours - measuring the time given is also a recognition of the energy,
effort and skills that comes with it. 
We really value and appreciate the time that tenants give coming to meetings and started to count
volunteering hours a few years ago so that we could measure the time that tenants give.
Measuring the time given is also a recognition of the energy, effort and skills that comes with it. 
The Sheltered Forum has been the only group that didn’t want to do meetings via Zoom but are
going to be restarting with separate meetings for Clydebank and Dumbarton/Vale in June, to keep
numbers smaller and safer. 
All other groups continued to meet via Zoom and 190.5 volunteering hours have been given to
meetings with Housing Services throughout 2021/22 which is a true testament to the commitment
of our tenants that are involved. 
The WDTRO Liaison, Joint Rent Group and Pre-HACC Forum all had an increase in attendance
but the overall total was reduced by less consultations taking place. Most groups have been
affected by some members not wanting to do online meetings or due to other reasons. 
2498.5
2289.5
4503
1325
79.06
38800.26
0
0
3887.81
2498.5
2685
4330
1675.15
632.84
39296.98
3.9
104.4
4626.5
358.07
Insurance
TPAS & TIS  Membership
TRA Annual Grants
Training and  conference costs
Postage
Housing News printing & distribution
Travel expenses
Catering
General  expenses
Digital participation
amount spent in £s
Breakdown of spending
Breakdown of spending with comparison to 2020/21
2021/22 2020/21
Page 141

Page 142

11.  The year ahead     
The WDTRO sadly lost a valued member Polly Wheelans, who passed away in January.  She was
a hard working member of the WDTRO and Littleholm TRA and is sadly missed.  Billy Neeson
also had to step down from the WDTRO and the Joint Rent Group (JRG) due to ill health. Billy was
a founder member of the JRG and his knowledge and understanding will be hard to replace. 
With 2 new TRAs being set up in Haldane and Whitecrook, there is much optimism for increasing
numbers of tenants getting involved in the year ahead.  As the Council slowly re-opens we are
also hoping to be able to facilitate hybrid meetings, so that those who prefer meeting face to face
can do so, while keeping the flexibility of meeting virtually available, which may be particularly
helpful for staff and save travel time. 
Recruiting new members has also been more difficult due to the restrictions on meeting up but
hopefully this year we and TRAs can be more visible and help generate new members. 
Walkabout are also being promoted as ideal ways for staff and tenants to assess individual streets
or areas and make improvements happen.  We want to make sure these are effective and well-
advertised. 
Our focus will be on ensuring that any involvement with Housing Services is a positive experience
for people and that all the support for effective participation is in place. 
Thank you to all our tenant volunteers and to housing staff who
make tenant participation work. 
Please give us your feedback. 
We want to continue to improve how we provide feedback to tenants, so please review this annual
report format and let us know what you liked, what you didn’t and what you want to see included in
the future. 
Jane Mack – 07983 542993 or Jane.mack@west-dunbarton.gov.uk 
Hanne Thijs – 07823 664 247 or hanne.thijs@west-dunbarton.gov.uk
Page 142

Page 143

OFFICIAL 
OFFICIAL 
Figures recorded at the end of Qtr. 1 show no change in
Group 1 crimes of violence compared to the same period
last year.  In total 46 crimes have been recorded, which
is slightly higher than the previous 5 year average (+6).
Compared to last year serious assaults have reduced by
30% from 30 to 21 however this has been offset by slight
increases in domestic abuse crimes and crimes relating
to cruel and unnatural treatment of children which have
increased from 3 to 7 (+4) and 2 to 4 (+2), respectively.
Across Argyll & West Dunbartonshire 4 persons
linked to serious and organised crime have been
arrestedand £15,530seizedunder POCA.
Compared to the same period last year, the total number
of bogus crimes recorded within West Dunbartonshire has
decreased from 17 to 8 crimes. Four of the 8 crimes
recorded during Qtr. 1 related to social engineering frauds
involving scam phone calls and 4 related to bogus
callers/workmen.
At the end of Qtr. 1 acquisitive crimes show a 29.7% increase compared to the same
period last year (n=101), which is 9.6% above the previous 5 year average.
Housebreaking crime have increased by 71.4% (n=20) due to a rise in domestic HB’s from
17 to 26 (+9) and a rise in HB’s at commercial properties from 6 to 16 (+10). The increase
in commercial HB’s is due to a spate of crimes in Alexandria at the beginning of the
financial year for which two offenders have been reported. Fraud crimes have increased
slightly from 63 to 70 crimes with the current figure remaining considerably above the
previous 5 year average (n=35.8). Frauds involving taxi fares have seen a notable increase
from 1 to 12 crimes year on year. Common thefts and shopliftings have also increased on
last year from 87 to 115 (+28) and 94 to 146, respectively.
At the end of Qtr. 1, drugs supply charges had decreased slightly from 25 to
23. Drug possession charges had also reduced by 33.2% from 211 to 141. Both
figures remain below the previous 5 year average.
At the end of Qtr. 1, figures show a 5.7% increase in the total number of road
traffic offences recorded within West Dunbartonshire from 610 to 645, while
the current figure is also 7.9% above the previous 5 year average (n=598).
Offences relating to using a motor vehicle without a test certificate have seen
the highest increase from 91 to 113 crimes (+22) while seat belt and careless
driving offences have also increased slightly. Speeding and drink driving
offences have both seen marginal reductions compared to last year.
Set against figures recorded at the end of Qtr. 1 last
year, Group 2 sexual crimes have seen a slight
reduction with 58 crimes recorded compared to 59      
(-1). Rape crimes have reduced from 14 to 11 (-3),
while sexual assaults have increased slightly by 2
crimes year on year. Approximately 75% of sexual
assaults occurred within a private space setting,
with 40% relating to non-recent reports and 25%
domestic related. Crimes relating to indecent
images/communications have decreased marginally
from 20 to 19 crimes with 74% being committed by
strangers to the victim.
The overall detection rate for Group 2 sexual crime has reduced from 54.2% to
22.4% compared to the same period last year and is currently below the
previous 5 year average (50.8%). This is due to several protracted enquiries
that have since been detected since Q1 reporting. The detection rate for
indecent/sexual assault has reduced very slightly from 21.1% to 19%.
At the end of Qtr. 1, 91 missing person reports had
been recorded which is an increase of 72% from 53 in
the same perod last year. MP incidents recorded on
STORM also increased by 53.4% from 133 to 204 but
remain 15.9% below the previous 5 year average.
Figures recorded at the end of Qtr. 1 show a reduction of 10.3% in domestic
abuse incidents from 358 to 321 (-37) which is 7.3% below the previous 5 year
average.  Domestic abuse crimes have also reduced by 5.7% from 211 to 199 (-
12) however the current figure remains marginally higher (1.1%) than the
previous 5 year average. 
In total 18 cyber-crimes had been recorded within West
Dunbartonshire at the end of Qtr. 1, which is a significant
reduction from 74 in the same period last year. A vast
education programme has taken place to assist in reducing
this figure. Cyber-enabled frauds accounted for 78% of all
cyber-crimes recorded (n=14) in Qtr. 1.
User Satisfaction results show that in Argyll & West Dunbartonshire public
confidence levels remain high with overall satisfaction levels at 73.4%. At the
end of Qtr. 1, 34 complaints about the police were recorded within West
Dunbartonshire which is a slight increase from 29 last year.  The number of
allegations against officers has reduced marginally year on year from 46 to 45.
The detection rate for Group 1 crime has reduced from 76.1% to 60.9% compared to
the same period last year and is below the previous 5 year average (74%). The
detection rate for common assault has increased from 59.5% to 65.4% compared to last
year but is also marginally lower than the previous 5 year average (67.1%).
Overall public reported ASB incidents continue to show a noticeable
downward trend, largely due to a decrease in public nuisance
incidents. Complaints relating to disorder have also reduced by
25.4% (-356).  ASB related crimes have seen a slight increase of 5.5%
(+38) and the current figure is also 30.5% above the previous 5 year
average. The increase in ASB crime is largely due to a 27% increase in
common assaults (n=64). Stranger assaults occurring in a public
space have seen the biggest increase (+26), in almost half of these
alcohol was a contributory factor. Assaults on police and emergency
workers have increased (+20).
There was 1 fatal road collision
recorded within West Dunbartonshire
during Qtr. 1 compared to 0 last year. 
Overall road casualties have seen an
increase of 60% (n=6) from 10 to 16.
The number of serious and slightly
injured casualties have both seen
marginal increases from 5 to 7 (+2) and
5 to 8 (+3), respectively. 
The number of incidents recorded in West Dunbartonshire where an adult
concern has been raised has reduced marginally by 8.6% from 476 to 435
compared to figures recorded at the end of Qtr 1 last year. Child concerns have
also shown a slight reduction of 1.3% from 1004 to 991.
Page 143

Page 144

OFFICIAL
OFFICIAL
Empowered Residents
Safe (Communities)
Nurtured (Children &
Young People
Flourishing Local Economy Independent (Older People)
Heart Start Training
Youth Engagement Officers have delivered heart start training to Police Scotland Youth Volunteers (PSVY) to enable them to feel more confident in CPR and using a community defibrillator if the occasion ever arises. In return, the PSYV
are now in the process of fund raising to buy a community defibrillator.
Keeping Ukrainian Families Safe
The well-known Keep Safe initiative has continued to develop in West Dunbartonshire. There are now 31 Keep Safe Places throughout West Dunbartonshire and recent developments have included having the Keep Safe materials
translated into Ukrainian to enable anyone who is seeking safety with the ability to access these premises by knowing their remit and where to find them.  Argyll and West Dunbartonshire Police Division have been involved in partnership
discussions regarding Homes for Ukraine and ensuring full support is available to those from Ukraine now residing in West Dunbartonshire. 
Missing Person Co-ordinator
A new dedicated missing person coordinator is now in place with work ongoing to make
introductions with the local Looked After and Accommodated Establishments to break
down barriers and raise awareness of missing person procedures. 
This will assist Police Scotland meet their obligations as a corporate parent.
We are looking at opportunities to learn from the ‘Respect’ Programme and options to
utilise our Youth Engagement Officers to deliver against the outcomes and provide support
and reduce harms for Care Experienced Young People. Work is also ongoing in relation to
repeat missing persons to ensure adequate support is in place for these individuals. 
Your Police – Your Local Policing Plan 
The 2020-2023 Local Policing Plan sets out the priorities that we have been focussing on
in West Dunbartonshire. Work is ongoing to revise this for 2023-2026 and understanding
the views and priorities of our diverse communities is fundamental to how Police Scotland
responds to the needs of the public. Our public engagement activities help us improve
how we deliver our policing services in local communities, ensuring they are accessible for
everyone. 
The “Your Police” survey will help us improve how we deliver local policing services. The
survey is designed to be completed online whether you work, visit or reside in West
Dunbartonshire with easy read formats availalble – visit consult.scotland.police.uk 
Pitching In Programme
The “pitchin in” programme has been successfully delivered for Vale of
Leven Academy, Dumbarton Academy and Our Lady and St Patricks
High School.   
The Pitchin’ In Programme was developed by Police Scotland after
recognising organisations involved in football could work together to
reduce harmful behaviour and promote individual and community
wellbeing, both in relation to football and more widely, through a
collaborative approach to prevention, diversion and education based
upon building decision-making skills and resilience.  
The “Pitchin’ in” Programme can be used proactively to assist young
people to develop their decision making skills to help them avoid being
drawn into harmful behaviour.  Each group consist of 14 pupils and is
targeted at those who are disengaged from school and has shown some
success. A further funding bid has been submitted to deliver additional
programmes this year when the new school term commences. 
Water Safety
Water safety inputs and workshops have been delivered to West
Dunbartonshire Secondary Schools, Looked After and Accommodated
premises and some youth groups.  During these inputs we discussed
the consequences of tampering with water safety equipment.  
Waterside throw line training has been delivered to Police Scotland
Youth Volunteers as well as some staff members within local schools.
Anti-Social Behaviour Disclosures 
Dedicated Anti-Social Behaviour and Disclosure officers provide real
time disclosures to Local Authority and Registered Social Landlords of
offenders and request warnings where appropriate.  These roles
monitor repeat addresses of ASB closely liaising with the relevant
partners to tackle these addresses as quick as possible after the ASB
was reported.  This has been received well by the relevant partners
and several warnings have been issued as a response. Inputs on anti-
social behaviour have been delivered to young people at some
primary schools in Dalmuir as a response to increased ASB in Dalmuir.
Hate Crime Campaign
Police Scotland takes hate crime very seriously. We will take
appropriate action and do everything we can to bring those
responsible to justice. Everyone in Scotland has rights that protect
them from hate crime.  We have supported a national Hate Crime
awareness campaign and locally, officers attended The Big Disability
Group in Dalmuir to promote our services and provide positive
engagement opportunities.
Operation Ballaton
This is a multi-agency action plan aimed at tackling the rise in ASB
traditionally observed during the summer months within the Balloch
locality. In conjunction with partners from BTP, WDC and Loch
Lomond and the Trossachs National Park officers stepped up
additional patrols within the Balloch Park and wider Balloch area to
engage with members of the public and deal with ASB and instances
of criminality. 
Forward Look
The Offensive Weapons Act 2019 forms
part of the UK Government’s response to
the rise in serious violence. 
The Act creates new powers and amends
existing legislation with the first part of this
coming into effect in June 2022 with
further amendments in December 2022. 
Page 144