Document Pack (Bookmarked) - HAC Committee 12 08 26

West Dunbartonshire Council · 12 August 2026
Back to Housing & Communities Committee — 12 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Official
Agenda 
Housing and Communities
Committee 
Date:  Wednesday, 12 August 2026
___________________________________________________________________ 
Time:  14:00 
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:  Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk           
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Housing and Communities Committee as detailed
above. 
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton G82 1QL. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT
Chief Executive 
Page 1

Page 2

Official
Distribution:- 
Provost Karen Murray Conaghan
Councillor Ian Dickson 
Councillor Gurpreet Singh Johal (Chair)
Councillor David McBride
Councillor Michelle McGinty
Councillor Lawrence O’Neill
Councillor Lauren Oxley 
Councillor Chris Pollock
Councillor Martin Rooney
Councillor William Rooney
Councillor Hazel Sorrell (Vice Chair)
Councillor Sophie Traynor 
All other Councillors for information 
Chief Executive
Chief Officer – Housing Services
Chief Officer – Resources 
Date issued: 30 July 2026 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site. 
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/ 
Page 2

Page 3

Official
HOUSING AND COMMUNITIES COMMITTEE 
WEDNESDAY, 12 AUGUST 2025 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING  
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
4 RECORDING OF VOTES   
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record. 
5 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
6 MINUTES OF PREVIOUS MEETING        7 - 12 
Submit for approval, as a correct record, the Minutes of Meeting of the
Housing and Communities Committee held on 13 May 2026. 
7 SCRUTINY REPORTS 
(a)  POLICE SCRUTINY REPORT 
Submit report by the Divisional Commander, Police Scotland providing
Members with an update Quarter 1 on local policing in West Dunbartonshire.                                   
13 - 23 
7 (b)/
Page 3

Page 4

Official
(b)  FIRE AND RESCUE SCRUTINY REPORT            To Follow
Submit report by the Local Senior Officer, Scottish Fire and Rescue Service
providing appropriate performance data measured against priorities in the
West Dunbartonshire Local Fire and Rescue Plan. 
8 WEST DUNBARTONSHIRE HOUSING ALLOCATION  
POLICY REVIEW   
25 - 46 
Submit report by the Chief Officer – Housing Services highlighting the
changes to the allocations policy and seeking approval for following a
comprehensive consultative review. Including details of the benefits and
reasoning behind the proposals, along with a summary of the feedback
received through consultative exercise. 
9 HOUSING EMERGENCY ACTION PLAN                47 - 54
Submit report by the Chief Officer – Housing Services providing an update on
the Housing Emergency Action Plan (HEDAP) which was formulated to
address the emergency following the Council’s housing emergency
declaration on 1st May 2024. 
10 MORE HOMES WEST DUNBARTONSHIRE – WEST    
DUNBARTONSHIRE COUNCIL’S AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME    
55 - 67          
Submit report by the Chief Officer – Housing Services providing an update on
progress with West Dunbartonshire’s More Homes Programme which
oversees the delivery of the Council’s new home building programme. 
11 SCOTTISH SOCIAL HOUSING CHARTER/ANNUAL  
ASSURANCE STATEMENT    
69 - 85 
Submit report by the Chief Officer – Housing Services seeking approval for the
annual progress report on meeting the requirements of the Scottish Social
Housing Charter and the Scottish Housing Regulator’s Regulatory Framework
for social housing, including the approval of the Annual Assurance Statement. 
12/ 
Page 4

Page 5

Official
12 MORE THAN A ROOF’ - WEST DUNBARTONSHIRE’S  
HOUSING SOLUTIONS STRATEGY UPDATE AND NEW 
APPROACHES TO HOMELESSNESS PROGRESS REPORT 
87 - 99   
Submit report by the Chief Officer – Housing Services providing an update on
“More than a Roof” West Dunbartonshire Council’s Housing Solutions 
Strategy for the period 2025-28 and new approaches to homelessness. 
13 HOUSING REVENUE ACCOUNT (HRA) BUDGETARY  
CONTROL REPORT TO 30 JUNE 2026 (PERIOD 3)     
101 - 106 
Submit report by the Chief Officer – Resources advising of the 2026/2027
HRA budget position on 30 June 2026 and the forecast position of the HRA
reserves as of 31 March 2027. 
CONTROL REPORT TO 30 JUNE 2026 (PERIOD 3)    
14  HOUSING REVENUE ACCOUNT (HRA) CAPITAL BUDGETARY     107 - 114 
Submit report by the Chief Officer – Resources providing an update on the
HRA capital programme to 30 June 2026 (Period 3). 
REPORT 2026/27 AS AT PERIOD 3 (30 JUNE 2026) 
15  GENERAL FUND HOUSING AND COMMUNITIES FINANCIAL      115 - 122
Submit report by the Chief Officer – Resources providing an update on the 
financial performance to 30 June 2026 (Period 3) of General Fund 
Revenue Services under the remit of the Housing and Communities 
Committee. 
Page 5

Page 6

Page 6

Page 7

HOUSING AND COMMUNITIES COMMITTEE 
At a Hybrid Meeting of the Housing and Communities Committee held in the Civic
Space, 16 Church Street, Dumbarton on Wednesday, 13 May 2026 at 2.00 p.m. 
Present: Councillors Ian Dickson, Gurpreet Singh Johal, David McBride,
Michelle McGinty, Lawrence O’Neill, Lauren Oxley, Martin
Rooney, William Rooney, Hazel Sorrell and Sophie Traynor. 
Attending: Peter Barry, Chief Officer – Housing Services; John Kerr,
Housing Development and Homelessness Manager; Nicola
Pettigrew, Housing Operations Manager; Claire McKay, Housing
Development Co-ordinator; Alan Young, Housing Asset and
Investment Manager; Christopher Anderson, Section Head and
Principal Solicitor; and Nicola Moorcroft and Lynn Straker
Committee Officers. 
Also attending: Divisional Commander Gary I’Anson and Chief Inspector Lynn
Edwards, Police Scotland; Group Commander Kevin Rennie
and Group Commander Brian Wardle, Argyll and Bute, East and
West Dunbartonshire, Scottish Fire and Rescue Service. 
Apologies: Apologies for absence were intimated on behalf of Provost
Karen Murray Conaghan and Councillor Kevin Crawford. 
Councillor Gurpreet Singh Johal in the Chair 
STATEMENT BY CHAIR – AUDIO STREAMING 
Councillor Singh Johal, Chair, advised that the meeting was being audio streamed
and broadcast live to the internet and would be available for playback. 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
RECORDING OF VOTES 
The Committee agreed that all votes taken during the meeting would be carried out
by roll call vote to ensure an accurate record
ITEM 6
Page 7

Page 8

OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Housing and Communities Committee held on 
25 February 2026 were submitted and approved as a correct record. 
SCRUTINY REPORTS 
(a) POLICE SCRUTINY REPORT 
A report was submitted by the Divisional Commander, Police Scotland,
providing an update for Quarter 4 on local policing in West Dunbartonshire. 
After discussion and having heard the Divisional Commander and the Chief
Inspector, in further explanation of the report and in answer to Members’
questions, the Committee agreed to note the update provided. 
(b) FIRE AND RESCUE SCRUTINY REPORT 
A report was submitted by the Local Senior Officer, Scottish Fire and Rescue
Service, providing appropriate performance data against priorities in the West
Dunbartonshire Local Fire and Rescue Plan. 
After discussion and having heard the Group Commanders in further
explanation of the report and in answer to Members’ questions, the Committee
agreed to note the update provided. 
HOUSING SERVICES DELIVERY PLAN 2025/26 YEAR-END PROGRESS AND
HOUSING SERVICES DELIVERY PLAN 2025/26 
A report was submitted by the Chief Officer – Housing Services setting out the year-
end progress of the 2025/26 Delivery Plan and presenting the new Delivery Plan
for 2026/27. 
After discussion and having heard the Chief Officer – Housing Services, the Housing
Development and Homelessness Manager, the Housing Operations Manager and
the Housing Asset and Investment Manager in further explanation and in answer to
Members’ questions, the Committee agreed to note the progress achieved at year-
end and the new Plan for 2026/27. 
Page 8

Page 9

HOUSING EMERGENCY ACTION PLAN 
A report was submitted by the Chief Officer – Housing Services providing an update
on the Housing Emergency Action Plan (HEDAP) which was formulated to address
the emergency following the Council’s housing emergency declaration on 1st May
2024. 
After discussion and having heard the Chief Officer – Housing Services, the Housing
Development and Homelessness Manager and the Housing Development 
Co-ordinator in further explanation and in answer to Members’ questions, the
Committee agreed:- 
(1)  to note the progress to date and the implementation of the key actions of the
Housing Emergency Action Plan as summarised in paragraphs 4.1 - 4.10 of
the report and in the action plan update within Appendix 1 of the report; 
(2) to note the addition of three actions to the action plan following the housing
summit, in paragraphs 4.4 of the report; 
(3) to note the updated statistics in paragraph 3.7 of the report related to 2025/26; 
(4) to note update that an additional three actions have been added to the plan
following the housing summit as noted in paragraph 4.3 of the report; 
(5) to note updates on the Scottish Government response to the national
emergency in paragraphs 4.11 - 4.15 of the report and what it means for West
Dunbartonshire Council’s Housing and Homelessness Services; 
(6) to note some key dates for parts of the Housing Act Scotland 2025 in
paragraph 4.16 of the report; and 
(7) to note the Chief Officer – Housing Services would continue to bring an
update report to future Housing and Communities committee meetings. 
MORE HOMES WEST DUNBARTONSHIRE – WEST DUNBARTONSHIRE
COUNCIL’S AFFORDABLE HOUSING SUPPLY DELIVERY PROGRAMME 
A report was submitted by the Chief Officer – Housing Services providing an update
on progress with West Dunbartonshire’s More Homes Programme which oversees
the delivery of the Council’s new home building programme. 
After discussion and having heard the Chief Officer – Housing Services, in further
explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach
including the successful award nominations for the Willox Court and Mount
Pleasant developments; 
Page 9

Page 10

(2) to note the successful completion of the new Willox Court development in
February 2026; 
(3) to note that the Chief Officer – Housing Services, will carry out the
procurement of and subsequently award, the contract up to the budgeted
costs for the projects at Gray Street and 28 Bridge Street, Alexandria; 
(4) to note the lifting of the temporary letting suspension at Young Street
sheltered housing complex; and 
(5) to note the new resource planning allocations for West Dunbartonshire for the
next four years. 
WEST DUNBARTONSHIRE COUNCIL’S TENANT PARTICIPATION STRATEGY
2025-28 – ANNUAL PROGRESS REPORT 
A report was submitted by the Chief Officer – Housing Services providing an update
on the implementation of “Involving You to Improve Housing Services” West
Dunbartonshire’s Tenant Participation Strategy which covers the period 2025-28. 
After discussion and having heard the Chief Officer – Housing Services in further
explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the progress and achievements made in relation to the implementation
of the strategy’s action plan; and 
(2) to commend the key role played by tenant representatives in the Housing
Service’s partnership approach to improving housing in West Dunbartonshire. 
PROCUREMENT OF THE PROVISION OF FURNITURE FOR SUPPORTED AND
TEMPORARY ACCOMMODATION 
A report was submitted by the Chief Officer – Housing Services seeking approval to
initiate a procurement process for the provision of furniture and household items for
the Council’s supported and temporary accommodation. 
Having heard the Chief Officer – Housing Services in further explanation the
Committee agreed:- 
(1) to approve the initiation of a procurement process for the provision of furniture
for supported and temporary accommodation; and 
(2) to grant delegated authority to Chief Officer – Housing Services, in
consultation with the Procurement Manager, to award the procurement for
Provision of Furniture for Supported and Temporary Accommodation,
provided the contract cost is within the approved budget and the tender being
in line with normal tender parameters. 
Page 10

Page 11

HOUSING REVENUE ACCOUNT (HRA) BUDGETARY CONTROL REPORT TO 31
JANUARY 2026 (PERIOD 10) 
A report was submitted by the Chief Officer – Resources advising of the 2025/2026
HRA budget position on 31 January 2026 and the forecast position of the HRA
reserves as of 31 March 2026. 
After discussion, the Committee agreed:- 
(1) to note the HRA forecasts a 2025/26 surplus of £1.079m, a projected
favourable variance (underspend) of £1.044m; and 
(2) to note the forecast 31 March 2026 HRA reserve position of £1.690m which is
£0.530m above the HRA prudential target of £1.160m. 
HOUSING REVENUE ACCOUNT (HRA) CAPITAL BUDGETARY CONTROL
REPORT TO 31 JANUARY 2026 (PERIOD 10) 
A report was submitted by the Chief Officer – Resources providing an update on the
HRA capital programme to 31 January (Period 10). 
After discussion and in answer to Members’ questions, the Committee agreed:- 
(1) to note the position of the 2025/26 HRA capital budget and the HRA capital
plan on 31 January 2026; 
(2) to note the project life performance was monitored against a £345.311m
project life expenditure estimate, a £80.378m project life income estimate and
a £264.933m five-year borrowing requirement; 
(3) to note that eleven projects are forecast to deliver a total underspend of
£9.249m against their five-year project life budgets; 
(4) to note that in year financial performance was monitored against a 2025-26
capital expenditure budget of £55.547m, 2025-26 capital income budget of
£6.290m and a one-year borrowing requirement of £49.257m; and 
(5) to note that there was an anticipated under spend of £10.477m against 
2025-26 budgets reducing the forecast one-year borrowing requirement to
£38.780m. 
GENERAL FUND HOUSING AND COMMUNITIES FINANCIAL REPORT 2025/26
AS AT PERIOD 10 (31 JANUARY 2026) 
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 31 January 2026 (Period 10) of General Fund Revenue
services under the remit of the Housing and Communities Committee. 
Page 11

Page 12

After discussion, the Committee agreed:- 
(1) to note the account currently shows a projected annual favourable variance of
£0.244m; and 
(2) to note the progress on efficiencies incorporated into 2025/2026 budgets. 
The meeting closed at 3.01p.m
Page 12

Page 13

OFFICIAL
OFFICIAL   
West Dunbartonshire
Performance Summary Report 
Reporting Period: April to June 26
Total Crime 115 Crimes
Incidents 
6103
Dishonesty Crimes
615
Domestic Abuse Inc 
339
+15.6% +11.4% -15.9%
+8.7% +23.8% -28.6%*
Road Deaths &
Serious Injuries
5
-13.6%*
Sexual Crime
104
-716*PYTD +40*PYTD, +48*5YR AVG +63*PYTD, +183*5YR AVG -64*PYTD, -9*5YR AVG
+32*PYTD, +46*5YR AVG +20*PYTD, +41*5YR AVG -2*on PYTD  -133*PYTD
Violent Crime
400 
Missing People
72 Counter Terrorism
+5*PYTD
+7.5%*
-19*PYTD, -9*5YR AVG
Common Assault
297
-39.6%
Housebreaking
29 
Disorder Complaints
842
The National Terrorism Threat level is 
SUBSTANTIAL
This means that an attack is likely. 
*PYTD = Previous Year to Date
*5YR = 5 year average 
+3.8%
-10.5%
ITEM 7a
Page 13

Page 14

OFFICIAL
OFFICIAL 
SECTION PAGE NUMBER 
Introduction 2 
Executive Summary 3
Demand Analysis 4
Acquisitive Crime 5
Public Protection 6
Road Safety 7
Serious Organized Crime 8
Violence  9
Antisocial Behaviour 10
Public Confidence - Complaints & Allegations 11
Introduction 
I am pleased to present this performance summary report to the West Dunbartonshire Housing
Committee for its information and consideration. The Reporting Period for this report is cumulative for
Quarters 1 to 4 of 2026/27, with available figures being shown from 1st April through to 30th June 2026. 
Please note that all data included in this report are management information and not official statistics.
All data are sourced from Police Scotland internal systems and are correct as of date of publication.
Unless stated otherwise numerical comparisons are against the previous year to date and the previous
five year average for the same data period specified. 
Crimes and offences are grouped under recognised categories for statistical purposes. The Scottish
Government defines these categories, as follows: 
Group 1 - Non Sexual Crimes of Violence  Group 6 – Anti-social offences 
Group 2 - Sexual Crimes  Group 7 – Miscellaneous Offences 
Group 3 - Crimes of Dishonesty  Group 8 – Road traffic offences
Group 4 – Damage and reckless behaviour PYTD  - Previous Year to Date 
Group 5 – Crimes against society CYTD - Current Year to Date 
Page 14

Page 15

OFFICIAL
OFFICIAL 
PRIORITY
AREA EXECUTIVE SUMMARY 
Acquisitive
Crime   At the end of Qtr. 1, acquisitive crimes have increased by 11.4% from 552 to 615
crimes compared to the same period last year.  This is largely attributed to a rise
in shopliftings (+97) and fraud related crime (+46) compared to 2025/26, while
housebreakings and vehicle crimes have seen overall reductions. 
Public
Protection   Group 2 sexual crimes have also risen by 23.8% with 104 crimes recorded
compared to 84 at the end of 2025/26.  This is largely due to an increase in the
number of sexual assaults from 20 to 44 crimes, while rape offences have also
risen marginally compared to the same period last year. 
Road Safety
& Road Crime
There were no fatal road traffic collisions within West Dunbartonshire as at the
end of Qtr. 1 which is unchanged from the position in 2025/26. 
Road traffic collisions resulting in serious injuries have reduced marginally with
5 recorded compared to 7 last year while those resulting in slight injuries have
also reduced by three. 
Serious
Organised
Crime 
As at the end of Qtr. 1 drugs supply crimes show an increase of 56% from 9 to
14 crimes while possession charges have also risen slightly from 107 to 113
crimes.   
Across Argyll & West Dunbartonshire 3 crimes linked to persons associated with
serious and organised crime have been recorded and £28,606 has been seized
under POCA since 1st April 2026. 
Violence &
ASB  At the end of Qtr. 1, Group 1 crimes of violence have increased by 8.7% with
400 crimes compared to 368 the previous year to date.  Anti-social behaviour
(ASB) related crimes have also risen slightly by 4.8% from 356 to 373 largely
due to increases in alcohol related offences (+12) year on year. 
1. Acquisitive Crime
2. Public Protection
3. Road Safety & Road Crime
4. Serious Organised Crime   
5. Violence & Anti-social behaviour 
WEST DUNBARTONSHIRE POLICING PRIORITIES 2023-2026
Page 15

Page 16

OFFICIAL
OFFICIAL 
CRIME PYTD CYTD INCIDENTS PYTD CYTD
Total Crimes &
Offences 3030 3145 Total number of
incidents 6819 6103
DEMAND ANALYSIS - * PYTD - PREVIOUS YEAR TO DATE CYTD - CURRENT YEAR TO DATE
* *
*
*
The total volume of crimes and offences recorded within West Dunbartonshire has seen an
overall increase when compared to the previous year while the current figure is also above the
previous 5-year average (+20.8%).  Acquisitive offences have experienced the highest increase
during the current reporting period (+63) followed by Group 5: Crimes against society (+37) and
crimes of violence (+32).  Crimes relating to damage and reckless behaviour (-47) and road traffic
offences (-14) have both seen slight reductions. 
Page 16

Page 17

OFFICIAL
OFFICIAL   
ACQUISITIVE CRIME
At the end of Qtr. 1, shoplifting crimes have seen an increase of 43.5% compared to the
previous year from 223 to 320 and are currently above the previous 5-year average (155).
Much of the increase YTD is due to a rise in crimes within the Dumbarton and Alexandria
areas with various repeat loci being targeted by prolific shoplifters. The detection rate for
shoplifting has reduced from 58.7% to 35.9% year on year.   
Fraud has also seen an increase of 64.3% from 56 to 92 crimes during the current reporting
period. Frauds involving stolen or lost credit/debit cards have seen the highest increase
YTD (+10) followed by social engineering (+8) and bank account takeovers (+7). The
detection rate for fraud has seen a reduction of 14.3% from 39.3% to 25%. 
Housebreaking crimes have seen a reduction compared to the previous period from 48 to
29 crimes, which is also below the 5-year average of 38. This is largely attributed to a
decrease in housebreakings at commercial premises (-19 crimes), while crimes at domestic
dwelling have also marginally reduced from 27 to 23 crimes year on year. The detection
rate for housebreaking overall is currently at 21%, which is decrease from 33.3% the
previous period. 
Common thefts have also reduced slightly from 128 to 106 crimes and is marginally below
the 5-year average (111). The detection rate has decreased slightly by 5.2%, from 29.7%
to 24.5% year on year. 
Police Scotland is actively tackling acquisitive crime in West Dunbartonshire through targeted
enforcement and strategic partnerships.  To combat a recorded increase in shopliftings and
frauds, which is reflective of the national picture, officers established a retailers consortium
and introduced a radio link scheme to improve instant communication between businesses. 
Additionally, the area secured vital funding from the ⁠Police Scotland Retail Crime Taskforce
for additional dedicated patrols in the main shopping precincts. 
These rising retail and cyber-enabled offenses have placed significant pressure on resources,
contributing to a corresponding reduction in the overall detection rate.  Despite these specific
operational challenges, targeted policing initiatives have delivered successful outcomes in
other sectors.  Local teams achieved a positive, highly encouraging reduction in the total
number of reported housebreakings and common thefts across the region during this period.
Page 17

Page 18

OFFICIAL
OFFICIAL   
Police Scotland handles public protection in West Dunbartonshire with the utmost priority.  Over the
April to June quarter, sexual assaults more than doubled, and reported rapes saw a very marginal
increase.  Approximately half of these reports were non-recent incidents. Crucially, these offences
are treated with top priority, achieving a detection rate of nearly 80%. 
Through proactive partnership working, there has been a very welcome reduction in the stubbornly
high volume of reported domestic incidents. While the percentage of these incidents resulting in
recorded crimes increased, the overall volume dropped.  Police continue to actively engage with the
Violence Against Women and Girls (VAWG) group and other local partners to deal with and fully
support domestic abuse victims. 
At the end of Qtr. 1 2026/27, Group 2 crimes have increased by 23.8% (+20) compared to the same
period last year. Much of the increase is due to a rise in sexual assault, which have more than doubled
from 20 to 44 crimes, while rape offences have also risen marginally from 20 to 23 crimes.   
Approximately 87% of rape crimes occurred in a private space setting with the majority being committed
by persons known to the victim. Around 55% of sexual assaults also occurred in a private place and 72%
of crimes were committed by persons known to the victim. Non-recent reports accounted for just over
half of all crimes (54%) during the current reporting period. The detection rate for rape has increased
slightly compared to last year from 70% to 78%, with an additional 4 crimes detected in number terms.
The detection rate for sexual assault also remains high at 77.3%. 
Crimes relating to indecent images/communications have remained fairly consistent compared to last
year from 35 to 32 crimes. Approximately 81% of crimes were committed via online platforms with half
being committed by persons known to the victim and 50% were by unknown profiles encountered through
social media or online chat rooms.   
The number of domestic abuse incidents has reduced by 15.9% compared to PYTD from 403 to 339,
while the number of crimes recorded has risen by 20% from 278 to 334 as at the end of Qtr. 1. The
crime/incident conversion rate has increased by 7.1% from 48.4% to 55.5%. A total of 72 missing person
reports have been recorded by the end of Qtr. 1, which is a slight increase of 7.5% from 67 last year. 
PUBLIC PROTECTION
Page 18

Page 19

OFFICIAL
OFFICIAL 
At the end of Qtr. 1, there were no fatal road collisions recorded in West Dunbartonshire, which is
unchanged from the position last year. Serious injuries have reduced marginally from 7 to 5, while
the number of slight injuries has seen a slight decrease (-3). There were no serious injuries
involving children in either reporting period.   
Offences relating to motor vehicles have seen a slight reduction of 1.5% from 944 to 930 (-14).
Increases in speeding offences (+25), careless driving (+12) and driving under the influence (+12)
have been offset by reductions in  vehicle defect offences (-27), unlawful use of motor vehicle (-
12), dangerous driving (-9) and drivers neglect of traffic directions (-8).     
Road Traffic Casualties 2024/25 2026/27 
Number of persons killed on our roads 0 0
Number of persons seriously injured 7 5
Number of persons slightly injured 7 4
Number of children seriously injured 0 0
Over the past quarter, ⁠Police Scotland activity across West Dunbartonshire has significantly
enhanced road safety and tackled road crime.  Positively, the area recorded zero fatal road
traffic collisions alongside a noticeable reduction in collisions resulting in both serious and minor
injuries. 
Divisional ⁠Road Policing Unit and local policing officers are currently prioritising the ⁠National
Motorcycle Safety Campaign and the Summer Drink Drive Campaign.  These joint operations
target careless driving and vulnerable road users through both high-visibility enforcement and
educational engagements. 
Alongside these campaigns, dedicated Youth Engagement Officers have been delivering the
Young Drivers Programme.  This vital educational initiative has reached all S6 pupils across all
five secondary schools in West Dunbartonshire, focusing on equipping new drivers with the
knowledge and attitudes required for safe motoring. 
A significant ongoing challenge for officers, which is being seeing across the country, is the use
e-scooters and illegal electric motorcycles.  To combat this, the local community policing team
have been successfully running an action plan targeting their use.  This proactive operation
resulted in numerous e-scooters and illegal bikes being seized.  Furthermore, several riders
have been reported to the ⁠Procurator Fiscal for a variety of road traffic offences. 
Overall, our continued enforcement and educational activities appear to be successful in
positively influencing driver behaviour.  This proactive, two-pronged approach has no doubt
contributed to keeping the roads safer, as evidenced by the corresponding reduction in casualty
statistics. 
ROAD SAFETY AND ROAD CRIME
Page 19

Page 20

OFFICIAL
OFFICIAL 
Across Argyll & West Dunbartonshire, 3 crimes linked to persons associated with serious and
organised crime have been recorded and £28,606 has been seized under POCA since 1st April 2026.  
As at the end of Qtr. 1, drug supply charges have risen from 9 to 14 crimes, while drug possession
charges have also seen a slight increase from 107 to 113 crimes. Both figures are currently below
the previous 5-year average however. 
Police Scotland continues to proactively target serious organised crime across West
Dunbartonshire using intelligence-led operations to dismantle criminal networks and reduce
community harm. 
Between April and June 2026, the division recorded an almost 60% year-on-year increase in
drug supply offences, all of which were successfully detected, alongside a smaller but positive
increase in drug possession offences. Officers also secured a small year-on-year increase in
cash seized under the Proceeds of Crime Act (POCA). 
Crucially, proactive enforcement is yielding clear health and safety dividends. There were zero
drug-related deaths during this reporting period, and the number of near-fatal overdoses
marginally declined. 
To achieve this, Police Scotland continues to work closely with the Alcohol and Drug Partnership
to reduce the harms associated with drug misuse in our communities.  Our Youth Engagement
Officers have continued to engage with young persons in the area, highlighting the risks of drug
misuse. 
SERIOUS & ORGANISED CRIME
Page 20

Page 21

OFFICIAL
OFFICIAL   
VIOLENCE & ANTI-SOCIAL BEHAVIOUR
In the quarter from April to June 2026, ⁠Police Scotland recorded an almost 10% increase in
violent crime across West Dunbartonshire.  While disappointing, this trend aligns with the
national picture.  However, a highly positive development is the almost 10% improvement in
the detection rate for serious assault.  An almost 40% reduction in the number of assaults on
police and other emergency workers is also welcome news. 
Because a significant portion of serious violent crimes in the area involve weapons, officers
continue to utilise stop search powers where appropriate.  High tariff offenders are identified
and actively pursued through local tasking.  There has been a year-on-year increase in the
number of stop searches being conducted in the area, along with a corresponding increase in
the number of positive stop searches.
Levels of violence in West Dunbartonshire overall have increased by 8.7% from 368 to 400 (+32)
crimes. Approx. 53% of all crimes took place in a private place. Furthermore, just over 40% of
public space crimes were committed by persons known to the victim. Much of the increase is
attributed to the rise in common assaults from 257 to 297 year on year. 
Both the number of serious assaults and robberies have risen marginally from 11 to 15 crimes
(+4) and 7 to 9 (+2) respectively. Approx. 80% of serious assaults occurred within a public space
and around 73% of crimes were committed by persons known to the victim. Eleven of the 15
crimes involved the use of a weapon with 6 being a knife or bladed instrument. 
90% of robbery crimes occurred within a public space with all but one crime relating to a street
robbery involving victims who were approached and assaulted in the street before being deprived
of personal items such as mobile phones, cash or jewellery. Five crimes were committed by
persons known to the victim. 
The detection rate for robbery has reduced by 19% from 85.7% to 66.7%, while the DR for serious
assault has increased from 63.6% the previous year to 73.3%. 
Page 21

Page 22

OFFICIAL
OFFICIAL 
Common assaults have experienced an increase of 15.6% (+40 crimes) and is currently above
the 5-year average (249). This has been offset by a reduction of 36.9% in assaults on police and
emergency workers (-24 crimes). Around 55% of common assaults occurred in private space
settings and in 46% of public space crimes, offenders were known to victims. Much of the
increase on last year is attributed to a rise in domestic assaults from 87 to 107 crimes as at the
end of Qtr. 1, while assaults involving neighbours and family members have also seen slight
increases. 
Across the recording period the number of ASB related calls to Police Scotland has reduced by
approx. 14% compared to last year from 1314 to 1129. Anti-social related offences (Group 6)
however have increased by 4.8% with 373 crimes recorded compared to 356 PYTD, while the
current figure is above the previous 5-year average (341). Stop searches have increased slightly
from 165 to 171 but remains below the previous 5-year average. 
VIOLENCE & ANTI-SOCIAL BEHAVIOUR 
Police Scotland is executing targeted operations in West Dunbartonshire to tackle antisocial
behaviour (ASB). Over the recent April to June quarter, police recorded an almost 15% year-
on-year reduction in ASB-related calls, although there was a slight increase in recorded ASB-
related crimes.
Collaborative efforts with ⁠West Dunbartonshire Council form the foundation of local
intervention, ensuring a swift response to community issues.  Officers are also operating joint
patrols to address a significant surge in antisocial behaviour involving personal watercraft (jet
skis) on Loch Lomond.  This recent spike is largely attributed to an extended period of good
weather.
To resolve this issue, local police are working in partnership with the Loch Lomond and The
Trossachs National Park Authority to enforce loch byelaws.  Continuous engagement with
relevant stakeholders and partner agencies is also ongoing to develop a broader range of
options for mitigating this problem.
Page 22

Page 23

OFFICIAL
OFFICIAL 
PUBLIC CONFIDENCE: COMPLAINTS & USER SATISFACTION
Overall satisfaction with Police Scotland
User Satisfaction results show that locally, public confidence levels remain high within Argyll and West
Dunbartonshire with overall satisfaction levels at 68.1%, albeit this is a notable reduction from the
position as at the end of the 2025/26 reporting period (82%) but in line with the position across the
West (68.3%). 
National Key Figures – Local Policing User Experience Survey Results
April to June 2026 (Q1 FY2026/2027) 
National Average
(Satisfied or Very Satisfied)
L Division
(Satisfied or Very Satisfied)
Ease of contact 67.5% 68.0%
Being provided with
appropriate response 62.3% 61.7%
Overall satisfaction 68.1% 68.1% 
Trading Standards Operation 
Almost 30,000 illegal cigarettes were
seized across West Dunbartonshire in
June, following a joint operation
between Trading Standards, local
community policing officers and Home
Office staff. 
Following concerns raised by the
community, an intelligence-led
enforcement operation was carried out,
involving the search of several shops in
the Clydebank area. 
Approximately 30,000 illegal cigarettes
and 10kg of hand rolling tobacco were
seized.  The contraband was found to
be either counterfeit, or otherwise not
for legal sale in the UK. 
A five figure sum of money was also
seized which was subsequently
handed over to the courts for
confiscation proceedings. 
68.1%
Satisfied/Very
Satisfied
Total of 
144
responses
Page 23

Page 24

Page 24

Page 25

Official
WEST DUNBARTONSHIRE COUNCIL 
Report by the Strategic Lead Housing and Employability 
Housing and Communities Committee: - 12 August 2026
___________________________________________________________________ 
Subject: West Dunbartonshire Housing Allocation Policy Review 
1. Purpose 
1.1 This report seeks approval for proposed changes to the West Dunbartonshire
Council Housing Allocation Policy following a comprehensive consultative
review. It sets out the rationale and anticipated benefits of the proposed
changes, summarises consultation feedback, and identifies the arrangements
required to support implementation and future monitoring.
2. Recommendations 
2.1 It is recommended that the Housing and Communities Committee: 
(i) approves the proposed changes to the West Dunbartonshire Council
Housing Allocation Policy, as set out in sections 4.2 to 4.7; 
(ii) notes the summary of consultation feedback in sections 9.1 to 9.3, with
full details provided in Appendix 1; 
(iii) invites the Chief Officer, Housing to ensure successful implementation
of the revised Housing Allocation Policy and to report progress to the
Housing and Communities Committee through established monitoring
arrangements; and 
(iv) agrees the introduction of a 12-month underoccupancy pilot, as detailed
in section 4.8 and Appendix 2, to help alleviate housing pressures in the
context of the Council’s housing emergency declaration. 
3. Background 
3.1  Carrying out regular reviews of our policies is good practice, and we aim to
review our allocations policy every three years.  This review was slightly
delayed with progress of the shared online housing application and awaiting
details of the Housing (Scotland) Act 2025. 
3.2 The review also provided the opportunity to ensure the current Allocations
process adequately meets housing need and takes account the pressures and
new demands of the housing emergency and the changes required as per the
new Housing Scotland Act 2025.   
ITEM 8
Page 25

Page 26

Official
3.3  A steering group and working group were established to take forward the
review. The groups, together with ongoing quarterly monitoring of the policy,
identified the areas for review. The review included consultation with relevant
stakeholders, with further detail set out in the Consultation Recording Sheet at
Appendix 1. 
4. Main Issues 
4.1 There are six areas of proposed changes. 
• Suspensions and number of reasonable offers, 
• Suspensions to Medical A applicants with rent arrears, 
• Increased priority for tenants underoccupying to encourage downsizing, 
• Considerations and changes to tenancies for homeowners, 
• Bedroom eligibility for children of the same sex, and 
• Bedroom eligibility for applicants with access only arrangements with
their children. 
More detailed information on these proposed changes is outlined below. 
4.2  Reducing Number of Reasonable Offers from 3 to 2 and setting a
timeframe. 
Proposal:
The current limit of offers housing applicants can receive before their
application is suspended for refusal is three, the proposal is to reduce this down
to two.  There is also no time limit to receiving the offers therefore proposing a
12-month timeframe is added. 
Benefits:
This would align us with the majority of social housing providers in Scotland
including local Registered Social Landlord (RSL) partners, making it more
consistent for applicants and would reduce time spent by officers working on
abortive offers and therefore benefit void times/rent loss.   
Consultation and feedback:  
Consultation feedback did not show majority support for reducing the number
of reasonable offers, with 32% agreeing or strongly agreeing, 45% disagreeing
or strongly disagreeing, and 23% unsure. In response, officers propose to retain
the three reasonable offers position but introduce a 12-month timeframe,
providing greater clarity for applicants while supporting more effective
management of offers.
4.3 Suspending Offers to applicants with Medical A points with rent arrears. 
Proposal:
All applicants who have rent arrears and are not maintaining a repayment
arrangement are suspended from receiving offers of housing except for
applicants who have a Medical A award.  The proposal is to remove this
Page 26

Page 27

Official
exemption from the policy.  This would mean that applicants regardless of the
priority will be suspended if they have rent arrears unless they are complying
with legislative requirements (value of arrears is less than a month’s rent and/or
has a repayment arrangement in place, maintained for at least three months). 
Benefits: 
This creates a fairer process for tenants who maintain their rent account or
maintain a repayment arrangement for arrears, especially for other Medical A
applicants who have no arrears.  If the tenant has arrears because of their
medical condition this would be taken into consideration.  
Consultation and feedback:
The feedback showed there was agreement for this proposal with 48%
agree/strongly agree, 25% disagree / strongly disagree, 27% unsure.   
4.4 Increase priority for tenants who underoccupy to enable more tenants to
downsize. 
Proposal:
Demand for larger family homes (4 bedrooms+) is a significant housing
pressure and is highlighted within the Council’s housing emergency action plan. 
Numbers of tenants downsizing aren’t high, and this creates bottlenecks in
waiting lists for those needing larger homes.  One reason for this is we are not
always able to reach as many of our transfer applicants as we would wish
freeing up those much-needed family homes.  The number of points awarded
for every spare bedroom an applicant has is the same for all waiting lists.  To
change this the proposal is to increase the priority points to our own transfer
tenants under occupying, to 33 points per bedroom from 20.   
Benefits:
The increase of points will allow for more tenants to be rehoused who are
underoccupying, which in turn will free up larger family homes to then rehouse
other larger families. 
Consultation and feedback:
The feedback from the consultation supported this proposed change with 67%
of respondents agreed that we should prioritise our own transfer applicants, 8
% said we should not and 25% were not sure.   
4.5 Allocating Properties to Homeowners on a Short Scottish Secure Tenancy
(SSST) 
Proposal:
The 2014 Housing Act allows social landlords to take ownership of housing into
account except where the owner cannot access their home or where occupying
it could lead to abuse or endanger their health.  In our current policy we do not
take ownership of housing into account, the proposal is looking to change that. 
If a homeowner cannot access their owned home safely will be allocated social
housing temporarily on a Short Scottish Secure Tenancy only, to allow them
Page 27

Page 28

Official
time to resolve access issues at their owned home.  If these issues cannot be
resolved, only then would we consider offering a permanent tenancy and it
would be preferred if the owner then agreed to sell their owned home to allow
this property to become a home for someone else rather than remaining empty
and we will provide advice in that respect. 
Benefits:
This again would align us with what the majority of our RSL partners in West
Dunbartonshire and would maximise our own housing stock to ensure it is being
used for those with the most need.  From analysis, the majority of the owner
occupiers applying for housing with the Council have no immediate housing
need. 
Consultation and feedback:
Consultation feedback showed strong support for offering an SSST in these
circumstances, with 56% agreeing or strongly agreeing, 13% disagreeing or
strongly disagreeing, and 31% unsure. There was also support for
encouraging owners to resolve their ownership position, with 73% agreeing
that owners should be expected to sell their owned home where a permanent
social tenancy is required, 10% disagreeing, and 17% unsure.
4.6 Changing the age limit for children of the same sex sharing a bedroom
from 10 to 16. 
Proposal:
The Allocation Policy uses household composition to determine bedroom
eligibility, it currently states that children over the age of 10 will be eligible for a
bedroom of their own, regardless of sex.  The proposal is to increase the ages
from 10 to 16 for children of the same sex.  Where a child requires their own
bedroom due to medical need, this will continue to be considered on a case-
by-case basis, informed by an occupational therapist’s assessment. 
Benefits:
This would bring our policy in align with other social landlords in the area but
also with the Department for Work and Pensions assessments of bedroom
eligibility which is also linked to housing cost payments.  Increasing the ages
will also ensure best use of our 4 plus bed sized properties. 
Consultation and feedback: 
The online survey showed low support for this proposal, with 22% agreeing or
strongly agreeing, 66% disagreeing or strongly disagreeing, and 12% unsure.
However, 73% of respondents indicated that the change would not affect their
current or future housing needs. Taking account of this, wider stakeholder
consultation, and feedback from the members’ session, officers recommend
proceeding with the proposal. The change is intended to maximise use of
available larger homes during a period when demand continues to outstrip
supply and the Council is responding to a declared housing emergency. 
Page 28

Page 29

Official 
4.7 Allowing only one additional bedroom for applicants with access
agreements for children. 
Proposal:
The proposal is to make changes to property size eligibility where a parent has
access only to their child/children to one additional bedroom.  If the child lives
with one parent all or most of the time that parent can claim the benefit and it is
therefore the primary parent that we would assess the child as living with for
room size eligibility not the parent with access. 
Benefits:
This change would make best use of limited housing stock and avoid people
living in homes that are predominantly underoccupied when we have high
numbers of families that are awaiting on offers of larger family homes.  This
again would also align with other housing providers including local RSL
partners.   
Consultation and feedback:
Consultation feedback showed majority support for this proposal, with 58%
agreeing or strongly agreeing, 17% disagreeing or strongly disagreeing, and
25% unsure. Officers therefore recommend proceeding with the proposal to
allow one additional bedroom for applicants with access-only arrangements for
their children. 
Underoccupancy – 12 Month Pilot – Two Bedrooms 
4.8 Demand for one-bedroom properties significantly exceeds the available supply
and has been identified as a key pressure within the housing allocation system,
contributing to the current housing emergency. By comparison, the availability
of two-bedroom properties is more favourable.  To mitigate this pressure, it is
proposed that a 12-month pilot be introduced permitting the allocation of certain
two-bedroom properties to households with a one-bedroom requirement.
Appendix 2 provides detailed analysis of demand, availability and supply across
both property size types.  This proposal seeks to maximise housing
opportunities for applicants with the highest assessed need, reduce waiting
times and allocation pressures, and support more sustainable tenancies by
allowing households some capacity to accommodate future changes in
household composition. 
5. People Implications 
5.1 Meeting the requirements to adopt the proposed Housing Allocations Policy will
be taken forward and managed from within existing staff resources. 
6. Financial Implications 
6.1 There are no direct financial implications within this report.  
Page 29

Page 30

Official  
7. Risk Analysis 
7.1 The reviewed and updated Housing Allocation Policy provides an opportunity
to improve the existing system, better reflect current housing demand, and
make effective use of available policy flexibilities. Key risks include potential
challenge where proposals proceed despite mixed consultation feedback,
operational pressures during implementation, and the need to ensure
applicants understand the revised rules. These risks will be mitigated through
clear communication, staff guidance, monitoring of outcomes, and reporting
through established governance arrangements. 
8. Equalities Impact Assessment (EIA) 
8.1 The policy has been subject to a full Equality Impact Assessment. No areas of
concern were identified. Officers will continue to monitor implementation to
ensure the revised policy operates fairly and remains focused on assessed
housing need. 
9.  Consultation 
9.1 The review of the allocations policy was undertaken in consultation with
tenants, applicants, tenants and residents’ group, members of staff including
members and other key internal and external partners.  The process included
the following: 
• January 2025 onwards – steering group and working group project review
developed; 
• 5th Nov 2025, to 14th Jan 2026 – online survey;
• 7th January 2026 – Members session
• May 2026 – Access to Housing Board approval
• 12th August 2026 - Housing and Communities Committee approval 
9.2 The policy changes are not assessed as having a negative impact on any
equality group. The points-based system is designed to be person-centred and
to prioritise applicants according to assessed housing need, ensuring those
with the most urgent need receive the highest priority. A detailed Consultation
Recording Sheet is provided at Appendix 1, and the Equality Impact
Assessment is available on request. 
9.3 An elected member session was held on 7 January 2026, providing members
with an opportunity to comment on the proposed changes and wider review
before this report was presented to the Housing and Communities Committee. 
10.  Strategic Assessment 
10.1 This Allocations Policy sets out how the Council intends to allocate its homes.
It lays out a hierarchy of need, in order to best allocate a limited supply of
housing.  The allocation of properties has a crucial part to play in promoting
sustainable communities, in which people will want to live and work.  These
Page 30

Page 31

Official
proposed changes will aim to best allocate this limited supply of housing as
effectively as possible. 
Peter Barry
Strategic Lead Housing and Employability
Date: 29th July 2026
___________________________________________________________________ 
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing and Employability, Church Street,
Dumbarton, G82 1QL, email: john.kerr@west-
dunbarton.gov.uk 
Kathryn Irvine – Senior Housing Development Officer,
Housing Development, Church Street, Dumbarton, G82
1QL, email: kathryn.irvine@west-dunbarton.gov.uk   
Claire McKay – Housing Development Co-ordinator,
Housing Development, Church Street, Dumbarton, G82
1QL, email: claire.mckay@west-dunbarton.gov.uk 
Appendices: Appendix 1 – Consultation Summary 
Appendix 2 – Underoccupancy Pilot       
Background Papers: Allocation Policy Review, February 2022 Housing and
Communities 
Housing Emergency, August 2026 Housing and
Communities Committee   
Allocation Policy Review Equalities Impact Assessment,
June 2026 
Wards Affected:  All 
Page 31

Page 32

Housing Services
Consultation Summary 
Housing and Employability, Housing Development 
Person responsible:  Kathryn Irvine, Senior Housing Development Officer 
Consultation Start date:  Oct 2025 – January 2026 
1. The name of
consultation /
participation
exercise?
Allocations Policy Review Consultation 
2. Its aims and
objectives?
Our Housing Allocations Policy was reviewed and updated in 2022. It
continues to largely reflects good practice and aims to meet demand
within the constraints of a limited supply.  We have however made a
commitment made to carry out a review of the policy every 3 year, we are
slightly overdue with this review therefore but that is in part due to the
launch of the Shared Application Form with our RSL partners. 
The review provides the opportunity to improve the existing policy where
possible so that it more adequately meets the needs of those in housing
need, aligns with our Housing Solutions Strategy and takes into account
of the Housing Scotland 2025 Act. 
3. Who did you
invite/include?
(e.g. all tenants,
tenant from the
interested
tenants register,
RTOs, staff)
• Tenants and Residents Groups and the WDTRO
• All West Dunbartonshire Council tenants
• Waiting list applicants 
• Local RSL’s
• The West Dunbartonshire Equalities Forum
• Housing Solutions Partnership Members
• Elected Members. 
4. What
methods did you
use to
Text to all waiting list applicants with link to online survey. 
ITEM 8 - APPENDIX 1
Page 32

Page 33

2 
promote/invite
stakeholders to
get involved?
(e.g. letters,
posters,
website)
The Councils website and housing news were used to advertise the
consultation.
Survey link sent directly to the WDTRO, TRAs, Equalities Forum &
Community Planning and the Housing Solutions Partnership members to
encourage their participation.
Paper copies were available from lead officer if needed.
Attend Both WDTRO and Housing Solutions Partnership meetings to
discuss and receive feedback. 
5. Who actually
took part?
(Number of
individuals and
or number of
tenant
organisations
represented) 
• Survey link text to all applicants
• 1060 responses to survey
• Elected members
• WDTRO
• Housing Solutions Partnership 
6. What
method(s) did
you use to
obtain their
views? (e.g.
focus/working
group,
newsletter,
survey)
Why did you
choose this
method(s)? 
• Online survey to gather views on specific proposals.  Method
chosen as seen as the best way to capture the views of as many
respondents as possible 
• Method chosen as seen as the best way to capture the views of as
many respondents as possible 
• Along with attending several in person meetings 
7. What good
practice or
minimum
standards can
you evidence as
part of your
consultation? 
The consultation was promoted several times in different editions of the
housing news, both informing tenants that it was coming up so to look out
for it, and again when it was live.  The consultation period lasted for 10
weeks, which is longer than the recommended 8 weeks as it coincided
with the Christmas break.  Plain English was used and the survey was
promoted by text and online to make it as accessible as possible. Paper
copies were also available.
Page 33

Page 34

3 
8. What was the
outcome of the
consultation?
Feedback from the consultation showed that we had a good level of
support for the majority of the proposed changes.
The consultation results were as follows – 
Q1 - Which of the following best describes you. 
Reducing Reasonable Offers from 3 to 2.
The first proposal was to reduce the number of reasonable offers
permitted from 3 to 2.  The benefits from this would be a reduction in
voids times, rent loss and less time spent on abortive offers for staff.  
Q2 – 
59%
35%
3% 2.5% 0.5%
I live in West
Dunbartonshire
I am an applicant
on West
Dunbartonshire
Councils Housing
Waiting List
I work for West
Dunbartonshire
Council
Other I work for a partner
organisation
Which of the following best describes you
46%54%
Were you aware of the current policy on the number of
reasonable offers before this survey?
No
Yes
Page 34

Page 35

4 
Q3 - 
Suspending Offers to applicants with Medical A points if they have
rent arrears.
The second proposal was to suspend offers to applicants with Med A
points if they have rent arrears.  The benefits from this would mean the
policy was fairer to all applicants who apply with this medical need and do
not have arrears.   
12%
20% 23% 22% 23%
STRONGLY AGREE AGREE UNSURE DISAGREE STRONGLY
DISAGREE
Do you agree with the proposal to reduce the
number of reasonable offers from 3 to 2 within a
12-month period?
Page 35

Page 36

5 
Q4 - 
Q5 - 
Encouraging tenants who are currently under occupying to
downsize.
The third proposal was to encourage tenants who are currently under
occupying to downsize.  Encouraging more of our own tenants to
downsize will help free up much needed larger homes for families on our
list who are overcrowded.   
83%
17%
Were you aware that Med A applicants with arrears
could still receive offers before this survey?
No
Yes
18%
30% 27%
13% 12%
STRONGLY AGREE AGREE UNSURE DISAGREE STRONGLY
DISAGREE
Do you agree with the suspending offers of
housing to Medical A applicants with rent
arrears and no repayment arrangement in place
Page 36

Page 37

6 
Q6 – 
Q7 - 
179 196
281
651
101
Worry about
packing up
belongings
Financial worries Loss of a garden /
outside space
All of the above Other
What do you believe are the barriers to moving for
those who are under occupying?
67%8%
25%
Do you think we should prioritise our own
existing tenants wishing to downsize with
higher under occupation points
Yes
No
Not Sure
Page 37

Page 38

7 
Allocating Properties to Homeowners on a Short Scottish Secure
Tenancy (SSST).
The fourth proposal was to only allocate properties to homeowners on a
Short SST until they can safely access their owned property.  The
benefits for this are that it would align with other RSL partners in the area
and ensure our policy is based on housing needs.  
Q8 – 
Q9 - 
23%
42%
35%
Do you think homeowners who can safely access their
own home should still be eligible for permanent
housing with the Council with a secure tenancy
Yes
No
Not Sure
16%
40%
31%
8% 5%
Strongly Agree Agree Unsure Disagree Strongly Disagree
Do you agree that homeowners who cannot
access their own home safely should be
allocated social housing temporarily on a Short
Scottish Secure Tenancy
Page 38

Page 39

8 
Q10 - 
Changing the age limit for children of the same sex sharing a
bedroom from 10 to 16.
The fifth proposal was to change the age limit for children of the same
sex sharing a bedroom from 10 to 16.  The benefits of this would again
align our policy with the DWP and partnering RSL’s in the area. 
Q11 - 
73%
10%
17%
Do you think if homeowners are allocated social
housing on a permanent secure tenancy they should
be required to sell their owned property
Yes
No
Not Sure
7%
15%
12%
24%
42%
Strongly Agree Agree Unsure Disagree Strongly Disagree
Do you agree with increasing the age at
which children of the same sex are
expected to share a bedroom from 10 to
16
Page 39

Page 40

9 
Q12 – 
Allowing only one additional bedroom for applicants with access
agreements for children.
The final proposal was to allow only one additional bedroom for
applicants with access agreements for children.  The benefits of this are
to make best use of limited housing stock and avoid people living in
homes that are predominantly underoccupied when we have large
numbers of families on our lists who are overcrowded. 
Q13 - 
14%
73%
13%
Would this change affect your current or future
housing needs
Yes
No
Not Sure
18%
40%
25%
10% 7%
Strongly Agree Agree Unsure Disagree Strongly Disagree
Do you agree with allowing only one additional bedroom for
applicants who have formal access agreements for their
children but whose children do not live with them
permanently
Page 40

Page 41

10 
Q14 – 
9. How did you
feedback to
participants the
outcome?
Following the Housing and Community Committee meeting we will
highlight the outcome of the consultation and subsequent policy changes
to tenants in a Housing News article and letters to waiting list applicants. 
10. How did tenant involvement influence your consultation?
Paper going to HAAC outlines the consultation results and the final Allocations Policy is
based on the views of tenants, applicants and staff.  Based on the participant feedback
some proposals were not taken forward and some however, due to needing to maximize use
of available stock we felt necessary still to proceed with. 
11. Are you able to demonstrate this?                    Yes                                       
12. How have
you
demonstrated to
tenants that
involvement
made a
difference?
Yes, feedback from the consultation on the proposed changes fed into
the draft policy that was developed. 
13. Did you
check with
participants that
they were happy
with the
opportunities
given to make
their views
During attendance with the WDTRO the opportunities to be involved were
covered and no feedback was received to indicate not happy so by
default accepted as being happy as representatives of tenants.
11%
79%
10%
Do you currently have an access agreement in place
for your children
Yes
No
Prefer not to say
Page 41

Page 42

11 
known and that
they felt that we
listened and
acted upon
them? 
What worked well, what didn’t work well – or any other comments you have.
..…………………………………………………………………………………………… 
Page 42

Page 43

Housing and Communities Committee – Underoccpancy Appendix – Allocations Paper
July 29, 2026   
Official Sensitive
Appendix 2 
Note 
Project Name Underoccupancy - 2-bedroom properties
Prepared by Claire McKay Date 29th July 2026 
Background
One of the key drivers behind declaring a housing emergency is the imbalance between demand
and available housing supply. This is particularly evident in certain property sizes, most notably
one-bedroom homes, where demand significantly exceeds availability. The data below highlights
that one-bedroom properties make up around a quarter of our stock, yet account for nearly a
third of turnover. Demand is especially acute among homeless households (approximately 80%),
as well as general applicants (around 60%) and transfer requests (approximately 50%). 
Stock Profile by Property Size and Type 
Bed size Number
1 2755 (26%)
2 4642
3 2638
4 353
5 20
6 2
7 2
8 2 
Property type Number
Houses 2970
Four in a block 3112
Tenement 1535
Multi 1174
Mini 72
Duplux/maisonette 1349
Multi sheltered 48 
Lets in 2025/26 
Row Labels Bed nos 1 Bed nos 2 Bed nos 3 Bed nos 4 Grand Total
GEN    63 108 35 1 207
ITEM 8 - APPENDIX 2
Page 43

Page 44

Housing and Communities Committee – Underoccpancy Appendix – Allocations Paper
July 29, 2026   
Official Sensitive
HLESS  212 230 68 14 523
TRAN   55 88 42 8 196
YCL    2 2     4 
YHO    7 3     10
RGN 15 1   15
Grand Total 358 (37%) 433 145 23 958*
* (909 lets excluding mutual exchanges) of the 909 lets of which 408 were 2
bedrooms.  213 went to households experiencing homeless which is 52%.  Of the 408
57 were houses. 
Live Homeless cases 
Live cases
Mar
26
Apr
26
May
26
Total number of live homeless cases 428 407 385
Number of live homeless cases open over a year 58 54 56
Number of live homeless cases with children 84 72 57
Total number of children within live homeless cases 187 165 131
Total number of children within live homeless cases not in temporary
accommodation  105 81 57
Number of live homeless cases On Offer 45 58 35
Number of live homeless cases Awaiting Offer 142 135 151
Number of live homeless cases with an active Section 5 referral 29 29 22 
Demand 
Wait list No. 1 bed No. 2 bed No. 3 bed No. 4 bed No. 5 bed No. 6 bed 
General 1467 (56%) 627 (24%) 349(13%) 151(6%) 40(1.5%) 13(0.5%)
Transfer 425 (46%) 244 (27%) 148 (16% 79 (9%) 27 (3%) 8 (1%)
YHO  6 (100%)     
YCL  17 (100%)     
Homeless 327 (85%)** 26 (7%) 20 (5%) 12(2.5%) 2(0.5%) 1(0.25%)
**number on the current waiting list is 122 (65% of the 187) 
In 25/26 of the 1055 homeless cases 758 were single people (72%) 
The above helps to demonstrate the different priority groups who are all competing for 1-
bedroom properties versus the higher availability and turnover of two-bedroom properties.
Despite our new build and buyback programmes having a focus to increase supply of 1 bedroom. 
Below shows the points levels of applicants on both 1 bed lists and 2 bed.  It shows that there are
a higher number of applicants who have higher points = greater need on the one-bedroom lists
compared to the two-bedroom lists.
Page 44

Page 45

Housing and Communities Committee – Underoccpancy Appendix – Allocations Paper
July 29, 2026   
Official Sensitive 
Decision Made by Housing Improvement Board 
Current data shows a clear imbalance between demand and supply: demand for one-bedroom
properties significantly exceeds supply, while two-bedroom properties are more readily available.
Previous reports have identified that failure to meet letting targets for homeless households,
youth priority groups, and young care leavers is largely due to the shortage of one-bedroom
accommodation. Underoccupation of two-bedroom properties has been used on an ad hoc basis
but more in harder to let areas. 
To better meet demand, it has been agreed that a 12-month trial will begin from 1st September
2026 formally allow the underoccupation of two-bedroom properties for applicants with the
highest level of need. During this period, allocations would prioritise applicants based on housing
need (i.e. highest points), rather than strictly matching property size to household size. This
means applicants assessed as needing two bedrooms would retain equal priority, but allocation
decisions would focus primarily on urgency of need. 
This approach aims to:
• Improve performance against all letting targets
• Eliminate waiting lists for young care leavers (YCL) and youth homelessness (YHO)
applicants
• Reduce the number of households experiencing homelessness
• Shorten time spent in temporary accommodation 
There are additional longer-term benefits. Underoccupying properties can help future-proof
housing need—for example, if a single applicant later has a child, they will already be
appropriately housed and will not require a transfer.  An additional positive it may help let harder
to let areas but is not the main driver for the policy change. 
The approach will remain person-centred. Applicants will not be required to accept a two-
bedroom property; if they decline or cannot afford it, they will continue to be considered only for
Page 45

Page 46

Housing and Communities Committee – Underoccpancy Appendix – Allocations Paper
July 29, 2026   
Official Sensitive
one-bedroom accommodation. 
Things to note
The proposal excludes two-bedroom houses from underoccupation, as these are more suitable
for, and should be prioritised for, households with children. 
The allocation process for properties which have adaptions will continue as they always have and
be allocated to a household who has a need for the adaptions so will go to either a 2 bedroom or
1 bedroom household who has a requirement for the adaption and has the highest points. 
A break/pause/amendment clause – the pilot will be for 12 months however, if a significant
unintended impact is realised prior to the 12 months it also for the Access to Housing Board to
pause, review and amend the pilot before the 12 months. 
Monitoring
The Access to Housing Board will monitor the pilot on an ongoing basis to evaluate its impact,
including the reasons for any refusals. It has been agreed that an additional refusal category will
be introduced for applicants who state that they do not wish to under-occupy a property or can
afford to secure alternative accommodation. Applicants refusing an offer for either of these
reasons will not be made any further offers of two-bedroom properties. 
Page 46

Page 47

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer, Housing 
Housing and Communities Committee: 12 August 2026
___________________________________________________________________ 
Subject:     West Dunbartonshire Housing Emergency Declaration Action Plan 
1. Purpose 
1.1 The purpose of this report is to provide members with an update on the Housing
Emergency Declaration Action Plan (HEDAP). 
2. Recommendations 
2.1  It is recommended that the Housing and Communities Committee: 
(i) Note the progress to date and the implementation of the key actions of the
Housing Emergency Action Plan. 
(ii) Note that a review of the Council’s Allocations Policy has been undertaken
and is subject to a separate report to this Committee, as referenced in
section 4.8; 
(iii) Note the proposed 12-month pilot to permit the allocation of selected two-
bedroom properties to households assessed as requiring one-bedroom
accommodation, where this supports the allocation of homes to applicants
with the highest assessed housing need, as set out in section 4.9; 
(iv) Note updates on the Scottish Government response to the national
emergency in sections 4.13 – 4.18 of this report and what it means for
West Dunbartonshire Council’s Housing and Homelessness Services,
and 
(v) Agree that the Chief Officer, Housing will continue to provide update
reports to future meetings of the Housing and Communities. 
3. Background 
3.1 On the 1 May 2024 Housing and Communities Committee agreed to declare a
Housing Emergency in West Dunbartonshire due to extreme and unprecedented
pressures facing housing and homelessness services in WDC. 
3.2 This was despite positive achievements across Housing to help manage the acute
housing need in West Dunbartonshire including the following: 
• 262 households prevented from experiencing homelessness,
• Progress in reducing the number of empty homes (council voids); and 
ITEM 9
Page 47

Page 48

• The construction of new council homes at the following development sites
Clydebank East, Mount Pleasant, Pappert and Gilmour Avenue. 
3.3 Despite this, housing demand increased and the following metrics highlighted the
pressures on Housing and Homelessness within West Dunbartonshire prior to the
housing emergency declaration. 
3.4 As reported previously to the Housing and Communities Committee, the Council
had been unable to fulfil all our statutory duties under homelessness legislation
and has incurred sixty-eight breaches of the Unsuitable Accommodation Order
(UAO) following 274 households being placed in Bed & Breakfast Accommodation
during 2023/24. 
3.5 The increased supply of new social homes is the key element to help address the
demand pressures, The funding cut to the wider Affordable Housing Supply
Programme of around 24% in 2024/25, significantly contributed to the Housing
Emergency Declaration. 
3.6 West Dunbartonshire Council was the fifth local authority to declare a housing
emergency following declarations made in Argyll and Bute, Edinburgh, Glasgow,
and Fife. Since the West Dunbartonshire declaration, a further eight local
authorities have followed suit and made a housing emergency declaration (South
Lanarkshire, West Lothian, Angus, Scottish Borders, Dumfries and Galloway,
Aberdeen, East Renfrewshire and East Lothian). Dundee have been the 14th to
Declare an emergency in March 2026 taking the total of fourteen out of thirty-two
local authorities, including four of the six housing stock transfer authorities. 
3.7 Significantly on the 15 May 2024, the Scottish Government declared a
National Housing Emergency in the Scottish Parliament. They launched their
action plan in September 2025. 
3.8 Below details the progress with figures which were the baseline which
contributed to the declaration of the Emergency and the current picture at
2025/26.  
3.8 The table below provides a snapshot of the current waiting list, including
applicants with no assessed housing priority or points. This context is 
2023/24 2025/26
Waiting List Numbers  5000 4000
No. of households in Temporary Accommodation  274 245
Households in Temporary accommodation inc
children 
89 84
Breaches of the Unsuitable Accommodation Order  68 43
No placements in Bed & Breakfast  274 174
Number of homeless applications  1100 1049
Page 48

Page 49

important in considering how available housing can be best targeted towards
households with the greatest assessed need. 
4. Main Issues 
4.1  The action plan has four main themes they are as follows: 
• Theme 1. Deliver and maintain More Homes - West Dunbartonshire
approach to the delivery of affordable housing,
• Theme 2. Make Best Use of Existing Stock,
• Theme 3. Enhancing Housing Access and the prevention of
homelessness, and
• Theme 4. Strengthen the Financial viability and capacity of the Housing
Revenue Account and associated Housing and Homelessness budgets. 
4.2 The Housing Emergency Project Board (HEPB) continues to meet monthly
basis since the housing emergency declaration led by the Chief Officer,
Housing.  The HEPB agreed further progress will be made via existing
governance arrangements such as Housing Improvement Board, More Homes
Project Board and Better Homes Project Board and reported to the overarching
Housing Emergency Project Board.   
4.3 The first Housing Summit of key Housing and Community Planning
stakeholders was organised in February 2025.  A second and successful
Housing Summit was held on 2 February 2026 with over 60 attendees from
every West Dunbartonshire Registered Social Landlord, Health and Social Care
colleagues, Community Planning Partners, Tenant Leaders, Third Sector and
Elected Members.  Positive conversations took place on further collaborative
actions and discussions for the coming year.   The project board held in March
have agreed to add an additional three actions to the plan from the summit.   
• Explore options to share services with Housing Associations to increase
new supply; 
• Review processes and protocols between HSCP and landlords to
expand joint working for more vulnerable tenants; 
• Explore additional actions to improve access to the private rented sector. 
Total Number of applicants with
no housing need
General 2818 721
Transfer 1045 377
Page 49

Page 50

4.4 With the new actions there are now a total of 71 actions within the plan. Of
which 37 are now fully complete with another 18 actions more than 50%
complete. 
4.5 A full progress report is available as a background paper and is summarised in
detail below against the four key themes: -   
Deliver and maintain More Homes - West Dunbartonshire approach to the
delivery of affordable housing 
4.6 The Housing and Communities Committee Convenor wrote to the housing
minister requesting the reinstatement of the funding cut to the Affordable
Housing Supply Programme funding.  Our funding for the Affordable Housing
Supply Programme has been reinstated.  The Council supported by tenant
prioritisation has continued to deliver much needed new homes.  In 2026/27 we
have completed 28 new builds so far.  The delivery of these new homes is
supported by The Council’s buyback scheme targeting housing need in West
Dunbartonshire with a particular focus on larger family homes, 10 buybacks
completed so far in 2026/27, two being 5 apartments.  The planning review is
now at national level which West Dunbartonshire Council fed into and welcome
the outcome.  We anticipate further updates after the summer recess. 
Make Best Use of Existing Stock 
4.7 There continue to be a focus and progress on voids, despite an initial increase
again in 2026/27, they are now back below 130.  The repairs policy continues
to be monitored since its rollout in April 2025 which continues to see a reduction
in times to complete repairs.  Continued progress on our review of supported
accommodation including productive conversations with Health and Social
Care Partners (HSCP).  We are continuing with our campaign drive along with
additional actions to help promote and maximise the use of Homeswapper
(mutual exchange scheme) to further meet housing need.    We are still awaiting
agreement from our RSL partners on the new downsizing scheme. The updated
empty homes strategy has brought 10 homes back into use so far in 2026/27,
one of which have brought back into use as council homes.  Our damp and
mould sensor project continues to roll out across our housing stock with at least
a third of the stock now having a sensor.  The review of our leased properties
has been completed and some of the actions from the review are beginning to
be taken forward. 
4.8 A review of our allocation policy has also been carried out ensuring we make
best use of our stock, the changes to help ensure this is detailed in a separate
committee report being discussed today. 
4.9 Demand for one-bedroom properties significantly exceeds the available supply
and has been identified as a key pressure within the housing allocation system,
contributing to the current housing emergency. By comparison, the availability
of two-bedroom properties is more favourable.  To mitigate this pressure, it is
proposed that a 12-month pilot be introduced permitting the allocation of certain
two-bedroom properties to households with a one-bedroom requirement.
Appendix 2 in the Allocations Policy paper provides detailed analysis of
Page 50

Page 51

demand, availability and supply across both property types.  This proposal
seeks to maximise housing opportunities for applicants with the highest
assessed need, reduce waiting times and allocation pressures, and support
more sustainable tenancies by allowing households some capacity to
accommodate future changes in household composition. 
Enhancing Housing Access and the prevention of homelessness 
4.10 Continued monitoring of the refreshed approach to assist with preventing
negative housing situations including a refreshed housing pathway for WDC
tenants who flee domestic violence.  Our No Homes for Domestic Abuse is
being reviewed with new legislation due to be enacted between April and
August 2026.  Year 2 actions of the new Housing Solutions Strategy will be
taken forward with a focus on a single access to housing approach and
preparation for the new Ask and Act duties that should increase prevention
activity.  The transfer led allocations approach for new builds continues to be
implemented and the outcomes are in the More Homes paper.  An overhaul of
our webpages has been agreed and is being taken forward in 2026/27 to
continue to tackle homelessness stigma but also to enable more informed
choices.  The shared common online housing application form was launched in
October 2025.  There are ongoing conversations about possible next stages
hopefully leading to a West Dunbartonshire Common Housing Register. 
Strengthen the Financial viability and capacity of the Housing Revenue Account
(HRA) and associated Housing and Homelessness budgets 
4.11 Several actions continue to be taken forward through the Housing Emergency
Project Board and the HRA Value for Money group which continues to meet on
a weekly basis to help strengthen the financial health of the Housing Revenue
Account.  Council Officers are also continuing to be part of a national
conversation with the Scottish Government, COSLA (Convention of Scottish
Local Authorities) and ALACHO (Association of Chief Housing Officers) to
investigate the possibility of HRA debt relief to enable local authorities to build
or acquire additional social rented homes.  A decision on this continues to be
outstanding from the United Kingdom Government.   The review of building
services is now complete which ensured value for money for the service and
tenants. 
4.12 Key performance indicators continue to be monitored to help show the progress
made through the action plan which will signify an end to the current emergency
declaration.   
Scottish Governments Response to National Housing Emergency  
4.13 The Cabinet Secretary for Housing announced the Scottish Government’s
response to the national housing emergency declaration in May 2024 to the
Scottish Parliament in September 2025, the response in the form of an action
plan has three key pillars to meet the required objectives: 
1. Ending children living in unsuitable accommodation 
Page 51

Page 52

2. Supporting the housing needs of vulnerable communities 
3. Building our future - maximising investment in Scotland’s housing
sector 
4.14 For the full list action plan and details can be found here.  Since the launch of
the plan progress has been made and funds distributed. 
4.15 As reported at previous committees we received an additional £310,000 for
acquisitions and £25,863 of Rapid Rehousing Transition Funds for Housing
First and £92,137 capital funds for extending Housing First tenancies.  All
monies were spent in 2025/26.  No further additional funds have been
announced for 2026/27. 
4.16 The First Minister announced the creation of “More Homes Scotland” in
January, a new executive agency that will work to accelerate new house
building, with the intention that it will be up and running by 2027/28.  The then
Cabinet Secretary for Housing announced the Blueprint on 26 March 2026
stating four core principles; 
1. Greater use of land assembly and preparation powers 
2. Enhanced support for planning and development delivery 
3. Standardisation and simplified commissioning
4. Flexible funding to drive economic growth 
4.17 A meeting with the Scottish Government’s Housing Emergency Division was
held in March 2026 to discuss our plans and received positive feedback
regarding our approach to the Housing Emergency and our actions and
progress made so far. 
4.18 Since the previous Committee meeting, an election has resulted in changes to
the Scottish Government. Responsibility for housing now sits with the Cabinet
Secretary for Social Justice and Housing, Shirley-Anne Somerville, rather than
with a standalone Housing Minister. Initial engagement with the Cabinet
Secretary indicates an expectation that all local authorities which have
declared housing emergencies will develop and present route maps outlining
the actions being taken to address these issues, with a particular focus on
interventions that extend beyond normal practice and contribute to resolving
the emergencies. 
5. People Implications 
5.1 Some of the actions involved are additional and not within current remits and
therefore may lead to additional staffing resources. The new legislative duties
also may require additional staffing resources. 
6. Financial and Procurement Implications 
6.1 The Housing Emergency Action Plan (HEAP) will need to be considered within
the context existing resources available to West Dunbartonshire Council across
both the General Fund and Housing Revenue Account (HRA). There is
Page 52

Page 53

currently no additional Grant or Subsidy funding available to Councils because
of declaring a Housing Emergency. 
6.2 The Housing Emergency Project Board will consider how existing resources
can be utilised to ensure delivery of the HEAP. This will include a review of Core
Budgets and any Temporary Funding Sources which may be utilised. 
6.3 The additional allocation to West Dunbartonshire Council of acquisition funding
of £310k was drawn down from the Affordable Housing Supply Programme
funding for 2025/26, the allocation will further support the Council’s buyback
scheme and will focus on moving children out of a homeless environment into
permanent accommodation. 
6.4 Housing supply continues to be the key factor in terms of the national and local
housing emergencies and if not increased and demand reduced it will lead to
continued pressures on temporary accommodation and ultimately Bed &
breakfast use which has negative financial implications for the Council’s general
fund. 
6.5 There are no procurement implications to note. 
7. Risk Analysis 
7.1 Regular breaches of statutory homelessness duties partly triggered the
declaration of the Housing Emergency, and it is highly probable these will
continue without focussed, cross Council and Partnership action led through
the Housing Emergency Project Board. 
7.2 The Council is also likely to experience significant legal, regulatory, and
reputational risk due to shortages of housing supply and related services.
Mitigation of these risks are included within the HEDAP, and these will be
managed through the Housing Emergency Project Board. 
7.3 There continued to be an increase in Bed & breakfast use from 5 in Q1 to a
total of 147 in total and a total of 43 breaches.  This is due to increase demands
and bottlenecks around needs for 1- and 4-bedroom properties.  Reinforcing
our need for a new build programme to build to match our needs.   
8 Environmental Sustainability 
8.1  The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy. 
9. Equalities Impact Assessment (EIA) 
9.1 An EIA has been carried out and there are no negative equalities impacts due to
this update.  A separate EIA screening will be conducted for any policy changes
because of the implementation of the HEDAP. 
10. Consultation
Page 53

Page 54

10.1 The Housing Emergency Declaration Action Plan (HEDAP) was consulted with
a range of key stakeholders including the West Dunbartonshire Tenants and
Residents Organisation. The implementation of the HEDAP is predicated on a
consultative and collaborative focus and several key stakeholders are
represented on the Housing Emergency Project Board. 
10.2 Consultation continues with our stakeholders via our Housing Summits which
has resulted in additional actions being added to our action plan. 
11. Strategic Assessment 
11.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities. 
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive & Adaptable 
Peter Barry
Chief Officer, Housing and Employability
Date: 30 July 2026 
___________________________________________________________________ 
Person/s to Contact:  John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk 
Claire McKay – Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing
and Employability, email: Claire.Mckay@west-
dunbarton.gov.uk 
Appendices: None 
Background Papers:  Housing Emergency Action Plan, July 2026 
Housing Emergency Declaration, Housing and Communities
Committee, May 2024 
Housing Emergency Update, Housing and Communities
Committee, May 2026 
Tackling Scotland’s Housing Emergency, Scottish
Government, September 2025 Supporting documents -
Tackling Scotland's Housing Emergency - gov. scot 
Wards Affected:             All     
Page 54

Page 55

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer, Housing 
Housing and Communities Committee: 12 August 2026 
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme 
1. Purpose 
1.1 The purpose of this report is to provide the Housing and Communities
Committee with an update on progress with West Dunbartonshire’s More
Homes Programme, which oversees delivery of the Council’s new build
housing programme. 
2. Recommendations 
2.1 It is recommended that the Housing and Communities Committee: 
(i) Notes the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach 
(ii) Notes the nomination of Mount Pleasant and the award win of the Willox
Court development in the Excellence in Accessibility and Inclusion
category at the 2026 Scottish Home Awards; 
(iii) Notes the commendation award of Mount Pleasant and the award win for
Willox Court in the 2026 Homes for Scotland ‘Affordable Development of
the Year – Small’ category; 
(iv) Notes the successful completion and forthcoming completion of the Bonhill
Gap Sites at Braehead and Campbell Street; 
(v) Approve that the Chief Officer, Housing, in collaboration with the
Procurement Manager, explores the potential for, and where appropriate
undertakes, a procurement exercise for a design and build contract for the
Queen’s Quay Site C development, subject to costs returned being
deemed acceptable by the service and compliant with procurement
requirements 
(vi) Notes the mainly positive feedback of the West Dunbartonshire Council
Strategic Housing Investment Programme (SHIP) from the Scottish
Government; and 
(vii) Approve and invite the Chief Officer, Housing, in collaboration with the
Chief Officer, Regulatory and Regeneration and the Chief Officer,
Resources, to conclude a short-term leasing arrangement for the vacant
site at Vale of Leven Industrial Estate to support the temporary decant of
ITEM 10
Page 55

Page 56

Dennystoun Forge tenants while the wider regeneration works are
completed. 
3. Background 
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which has successfully delivered over one thousand new affordable homes in
West Dunbartonshire and includes the Council’s own new home building
programme. 
3.2 The Strategic Housing Investment Plan (SHIP) 2026-2031, outlining West
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach, was approved by the Housing and
Communities Committee in November 2025. The SHIP outlines plans to
contribute to the Council Administration’s aim of delivering 2,500 new
affordable and social rented homes over the 10-year period 2022-2032. 
4. Main Issues
More Homes West Dunbartonshire - Delivery Programme
4.1 Building new affordable homes has an important role to play in revitalising
local economies and assisting with post-pandemic and economic recovery
plans, negating the impacts of the current cost of living crisis and combatting
poverty principally child and fuel poverty.  It is also clear that the need for
affordable homes has and will increase in the current ongoing economic
environment and declaration of a housing emergency. 
4.2 In July 2025, Shelter published its study The Social Value of New Social
Housing in Scotland  The research report’s key conclusion is that it has shown
that new social housing is driving improvements in social, economic and
health outcomes for its residents, and where this impact is achieved, there is
huge capacity for significant preventative savings to wider society. 
4.3 The Council’s More Homes West Dunbartonshire approach is an ambitious
plan that aims to continue the positive momentum of the delivery of much
needed Council homes in West Dunbartonshire and will significantly assist the
Council’s aim to deliver 2500 new social and affordable homes by 2032. 
4.4 As the largest affordable housing developer in West Dunbartonshire, the
Council has identified a number of development sites for new council homes
to address existing and new housing need. The design of these homes
provides sustainable homes using innovative technology and delivering on our
low carbon ambitions including Passivhaus and other net zero carbon
opportunities.  We anticipate the new homes delivered by the Council will
have a minimum lifespan of beyond 100 years. 
Page 56

Page 57

4.5 The Council’s More Homes West Dunbartonshire approach has evidenced
strong support from council tenants and is highlighted as one of the top two
key future spending priority areas for tenants through the comprehensive
tenant satisfaction survey reported to the Housing and Communities
Committee previously. 
4.6 The Council’s recent completed developments at Mount Pleasant and Willox
Park have both been shortlisted for the Affordable Housing Development of
the Year Award in the Homes for Scotland Awards, for which Mount Pleasant
was commended and Willox Park won. Both were also shortlisted for the 2026
Scottish Home Awards Excellence in Accessibility and Inclusion category of
which Willox Park also won. This follows the Clydebank East development
being awarded the prestigious Herald Property Awards - Affordable Housing
Development of the Year Award late last year, for which the Mount Pleasant
development has also been shortlisted this year. 
4.7 As part of our ongoing monitoring of the impact of the completed housing
developments, the three most recent mainstream completions (Clydebank
East/Mount Pleasant and Pappert) have significantly contributed to meeting
housing need within West Dunbartonshire communities and combined have
contributed to lifting 131 children out of homelessness and into a secure
tenancy through initial and secondary allocations through the transfer led
approach.  The reduction in children experiencing homelessness is a key
strategic objective of the Housing Emergency Declaration Action Plan.   
4.8 The approved Strategic Housing Investment Plan and HRA Capital
Investment Plan outlined the plans the Council have for meeting their new
build ambitions.  An update on each development site is provided below: - 
Willox Park Phase 1, Doveholm, Dumbarton 
Housing Mix 
This development was completed on the 9th February 2026. 
The development has won two awards recently:
• The 2026 Homes for Scotland ‘Affordable Development of the Year –
Small’ award and;
• The 2026 Scottish Home Awards ‘Excellence in Accessibility and
Inclusion’. 
Willox Park Phase 2 
Phase 2 is part of the wider housing regeneration plans for the Willox Park
area. 
House Type Sustainability Standard Number of New
Homes
Flat 2bed/3person  Net Zero 2
Flat 1 bed/2person Net Zero 15
Page 57

Page 58

Planning was submitted for 22 new amenity homes on the 23rd June 2026.
The housing mix can be viewed in the table below: 
McTaggart Construction have been awarded the design and build contract
which will also include the demolition of the existing homes following
completion of Phase 1. All homes are being designed to housing for varying
needs standards and dementia friendly principles to encourage ageing in
place and inclusive living.   
The design team are currently working towards the demolition of the existing
Willox Park stock. This is estimated to begin in October to enable a site start
in the new year. One resident remains in the complex.   
Bonhill Gap Site Strategy 
The 28 units of housing at Braehead (17 homes) and Campbell Street (11
homes) went on site in August 2025 and were scheduled to complete within a
56-week period. 
Handovers for Braehead were completed in July. The full handover for the
properties in Campbell Street are expected to be completed in August 2026. 
The JR Group were successful in the tender for the 6x 1 bedroom cottage
flats at the O’Hare site and are currently developing the technical design and
programme. All going well with approvals there is an estimated site start for
early Autumn 2026. 
The housing mix of the full Bonhill Gap Site development programme is
highlighted in the table below and will include 8 large family homes and 16x 1-
bedroom flats to meet the key identified need: - 
Bank Street, Alexandria
House Type Sustainability
Standard
Number of New
Homes
Bungalow 1bed/2person Net Zero 14
Bungalow 1bed/2person w/c Net Zero 2
Cottage Flat 1bed/2person UF Net Zero 3
Cottage Flat 1bed/2person LF Net Zero 3
House Size Sustainability Standard Number of New
Homes
1bed wheelchair Net Zero 4
1 bed general needs Net Zero 16
2 bed wheelchair Net Zero 3
3 bed general needs Net Zero 3
4 bed general needs Net Zero 2
5 bed general needs Net Zero 4
7 bed general needs Net Zero 2
Page 58

Page 59

The development will consist of twenty-two sheltered/amenity housing units in
partnership with the HSCP. A site start was achieved in October 2025 and is
scheduled for completion in April 2027 
House Type Sustainability Standard Number of New
Homes
Flat 1bed/2person w/c Net Zero 22
Communal Room Net Zero 1
Staff Office Net Zero 1 
As reported to the August Housing and Communities Committee the tender
return was some £2.4m below the initial estimated cost.  This development as
with the development at Willox Park, involved the tenants at Gray Street who
have been consulted throughout the design process and will be assisted to
make the transition as smooth as possible. 
The estimated completion date is 1st April 2027 
Gray Street Regeneration 
As the development at Bank Street will replace the current sheltered housing
accommodation at Gray Street, we have carried out both feasibility and
viability assessments for the future Gray Street regeneration site.  The
optimum housing mix aligns with the Council’s strategic housing objectives of
providing family housing and housing for the elderly, the project will also have
provision for 2 family sized wheelchair homes and is outlined below which will
see the delivery of 15 new council homes below: 
A viability assessment based on the optimum housing mix has been
undertaken using the following planning assumptions and was approved at
the May meeting of the Housing and Communities Committee. 
West Thomson Street (former Clydebank Health Centre) 
The proposed development will provide 42 new homes - 15 units of family
housing and 27, fully accessible, sheltered/amenity homes for the elderly. The
proposed housing mix is noted below: - 
House Type Sustainability
Standard
Number of new
Homes
House 4 bed/6 person  Net Zero 2
House 3 bed/6 person Net Zero 2
House 3bed/6-person w/c Net Zero 1
Cottage Flat 1bed/2 person Net Zero  8
Cottage Flat 3bed/5-person w/c Net Zero 1
Cottage Flat 2bed/4person Net Zero 1
Page 59

Page 60

CCG were awarded the contract for the design and build of the development.
They are currently working on the technical design. The programme indicates
a site start of winter 2026 with completion 56 weeks later.   
The current plan is to introduce twenty-seven additional sheltered/amenity
homes through this West Thomson Street development. The current energy
strategy allows for a communal ground source heating system. This may offer
future opportunity to tie into the wider district heat network and the end of the
system’s life cycle. We are applying for funding from the Scottish Heat
Network Fund to try and mitigate the costs of this but have yet to receive a
decision. Councillors should be aware that this system will be subject to
reporting as a requirement of the new Ofgem regulations for heat networks
which will have resource implications and will be highlighted to a future
meeting of the Housing and Communities Committee. Other sites including
Clydebank East, Queen’s Quay and Willox Court will also be subject to this
new regulatory obligation. We are continuing to monitor these factors and
costs as we move forward with the design.   
Dennystoun Forge Gypsy/Traveller Site 
To enable the works to proceed safely, residents will require to be decanted
during the contract period. Officers from across relevant service areas,
together with residents, carried out an assessment of Council decant site
options. The assessment found that a vacant site within the Vale of Leven
Industrial Estate was the favoured location, with the old pavilion area at Havoc
being considered as the standby should the preferred option not be possible. 
Committee approval is sought to proceed to agree terms for a short-term
lease of this site for a period of approximately 6-9 months while the main
regeneration works at Dennystoun Forge take place. A planning application
will require to be lodged for temporary consent. If consent is granted, works
will proceed as soon as practicable to enable residents to move from the main
site. Timescales will be finalised, but it is hoped that works will commence
before the end of 2026. 
Queen Mary Avenue, Clydebank (Clydebank Gap Sites) 
The Housing Mix can be seen below:
House Type Bed Number WCH
Sheltered/Amenity
Flat
1 27 27
Cottage Flat 1 2 2
Duplex Cottage Flat 3 2 
House 5 2 
House 4 5 
House 3 4 
Total  42 29
Page 60

Page 61

The main contractor is CCG. Site start was the 20th October 2025 with a
planned programme of 61 weeks. 
The contractor is optimistic of a handover at the beginning of September
2026. 
Dumbuie Avenue and Smollett Road (Silverton Regeneration) 
The council have been assembling this site for over 10 years, following
structural issues with the previous properties located within the sites which
were demolished in November 2024. 
Following approval from the Housing and Communities Committee to direct
award a design and build contract to deliver the Silverton regeneration project
up to the budgeted costs for project (Dumbuie Avenue and Smollett Road),
the project is now included within the Council’s Strategic Housing Investment
Plan 2026/27-2031/32 which was approved at the Housing and Communities
Committee of 19th November 2025. 
A Planning application for Dumbuie was submitted in May 26 however we
now have design information which has increased the cost of delivery
summarised below: 
1, A piled foundation solution is required due to ground conditions.
2. Scottish Water have notified that connection can’t be made to the adjacent
combined sewar and this needs to be taken to a connection at the A82
3. Flood mitigation to the threshold is required. 
The three components above now make the development unaffordable within
the current approved budget. Officers have approached the Scottish
Government for additional funding and further grant funding would be required
for this project to meet the Council’s viability assessment. Officers are also
exploring other potential grant funding streams to support delivery of the site. 
The housing mix includes:
• 1x 3-bedroom wheelchair bungalow; 
• 2x 3-bedroom semi-detached houses; and 
• 3x 3-bedroom terraced houses. 
House Type Sustainability Standard Number of New
Homes
1 bed/2 person  Cottage Flat Net Zero 10
2 bed/3 person WCH Cottage Flat Net Zero 1
3 bed/4 person Cottage Flat Net Zero 1
3 bedroom terraced house Net Zero 3
4 bedroom semi-detached Net Zero 2
Page 61

Page 62

28 Bridge Street, Alexandria 
This project relates to the purchase of the former Prep4Life building at Bridge
Street, Alexandria. A mini competition was published on 23rd June 2026 with a
closing date of 21st July 2026, through the Scottish Procurement Alliance RM3
framework, for a contractor to convert the building into 8 units of self-
contained accommodation – including 2 ground floor wheelchair accessible
units. 
The aim of these works is to enable accommodation for young care leavers to
transition out of residential care, with a level of support, prior to taking on their
own independent tenancy. Housing have worked closely with West
Dunbartonshire’s Health and Social Care Partnership on this project. 
Ottawa Crescent 
This project is for 21 amenity homes, similar to the successful developments
at Creveul Court, Alexandria and Mount Pleasant, Old Kilpatrick. 
CCG are the build contractor. They started on site at the start of June and
have a completion date estimate of July 2027 
The proposed housing Mix is provided below: 
House/Flat Type Bedrooms Number
Flat GF WCH 1 3
Flat with lift 2 9
GF Cottage Flat 1 2
FF Cottage Flat 1 2
Bungalow 1 5 
Queen’s Quay Site C 
The current development proposals from Barratt for 227 new homes on the
adjacent land next to site C has enhanced the viability of being able to
develop the council owned land on Queen’s Quay Site C. 
Previously, Queen’s Quay Site C has not been an affordable site to develop
due to the costs associated with infrastructure such as extensive road and
utilities provision. However, the Barratts development offers a unique
opportunity which could potentially mitigate these costs and open up the Site
C land to develop for affordable social housing. There are also other factors
which may help to keep development costs down for the Council if we enter
into a deal with the contractor. For example, there will be a mitigated/shared
cost for programming, site mobilisation, site investigation, required piling work,
and connection to district heat network and roads infrastructures. It is
anticipated that this would result in value for money for the council due to
Page 62

Page 63

economies of scale for Barratt, which would not be achievable if this was
developed as a stand-alone site. 
Barratt are not currently on a framework which can be utilised for local
authority council housing. We are therefore seeking permission to explore the
potential to enter into a design and build contract, depending on price and
design, with Barratt for the development of affordable social housing for West
Dunbartonshire Council. 
The Council has received grant funding to acquire the site, if the site is not
able to be developed the funding would be clawed back by the Scottish
Government. No current legal agreement or commitment has been made as
we are only exploring this as an avenue to develop the site. 
Buyback Programme 
Total number of properties purchased in 2026/27 financial year   10
Total Purchase Value                                                                    £1,300,550 
We have a further 7 properties under offer awaiting completion dates. 
Below is an update breakdown of acquisitions by electoral ward for the
financial year so far 26/27: 
Mortgage to Rent 
We have also completed the purchase of a property in O’Hare through the
Scottish Governments mortgage to rent scheme.   
4.9 In May 2026 the Scottish Government issued its feedback on the West
Dunbartonshire Council Strategic Housing Investment Plan (SHIP) 2026 –
2031 which was approved by Housing and Communities Committee in
PROPERTY SIZE PURCHASED
5 apt 2
4 apt 4
3 apt 2
2 apt 2
Buyback Acquisitions 2025/26 No of Acquisitions (as at
09/07/26)
Ward 1 - Lomond 2
Ward 2 – Leven 2
Ward 3 – Dumbarton 1
Ward 4 – Kilpatrick 0
Ward 5 – Clydebank Central  5
Ward 6 – Clydebank Waterfront 0
Total  10
Page 63

Page 64

November 2025.   The feedback re-emphasises the importance of the SHIP
as the expression of the Council’s strategic housing investment priorities. 
4.10 The feedback provided a positive summary of Scottish Government feedback
on West Dunbartonshire Council’s Strategic Housing Investment Plan 2026–
2031, highlighting strong alignment with Local Housing Strategy outcomes
and clear recognition of the Council’s delivery performance, prioritisation and
partnership approach. The feedback particularly acknowledges the SHIP’s
contribution to increasing the supply of new build social rented homes,
including larger family homes, wheelchair accessible properties and specialist
provision, supporting wider objectives around homelessness prevention, child
poverty reduction and equalities. It also recognises the Council’s strong
collaborative approach with partners and communities. Two areas for further
consideration are identified: exploring the use of income from empty and
second homes to support affordable housing delivery, and ensuring that all
new developments, including those delivered by RSL partners, contribute to
Housing Solutions/Rapid Rehousing Transition Plan and Housing First
objectives. 
4.11 In July, the Scottish Government officially published the four-year resource
planning allocations to deliver new housing within the Affordable Housing
Supply Programme.  West Dunbartonshire receives 1.7% of the total overall
funding and £51m over the four-year period. 
Local Authority Area
2026-27
£m
2027-28
£m
2028-29
£m
2029-30
£m
Total
£m
Aberdeen City 16.298 16.787 17.290 17.809 68.184
Aberdeenshire 27.779 28.612 29.470 30.355 116.216
Angus 10.118 10.422 10.735 11.057 42.332
Argyll & Bute 20.189 20.795 21.419 22.062 84.465
Clackmannanshire 6.984 7.193 7.409 7.631 29.216
Dumfries & Galloway 22.597 23.275 23.973 24.692 94.537
Dundee City 18.616 19.174 19.749 20.342 77.881
East Ayrshire 13.598 14.006 14.426 14.859 56.890
East Dunbartonshire 7.738 7.970 8.209 8.455 32.372
East Lothian 12.554 12.931 13.319 13.718 52.521
East Renfrewshire 7.696 7.926 8.164 8.409 32.196
Edinburgh, City of 66.383 68.375 70.426 72.539 277.723
Falkirk 14.982 15.431 15.894 16.371 62.679
Fife 39.963 41.162 42.396 43.668 167.189
Glasgow, City of 123.283 126.982 130.791 134.715 515.772
Highland 50.132 51.636 53.185 54.781 209.733
Inverclyde 10.476 10.791 11.114 11.448 43.830
Midlothian 10.586 10.904 11.231 11.568 44.288
Moray 9.571 9.858 10.153 10.458 40.040
Na h-Eileanan Siar 9.088 9.361 9.642 9.931 38.021
North Ayrshire 16.889 17.396 17.918 18.455 70.659
North Lanarkshire 36.014 37.095 38.208 39.354 150.671
Orkney Islands 3.933 4.051 4.172 4.297 16.453
Perth & Kinross 16.998 17.508 18.033 18.574 71.112
Renfrewshire 19.171 19.747 20.339 20.949 80.206
Scottish Borders 17.743 18.275 18.823 19.388 74.230
Shetland Islands 5.609 5.777 5.950 6.129 23.465
South Ayrshire 13.225 13.622 14.031 14.451 55.329
South Lanarkshire 32.384 33.356 34.357 35.387 135.484
Stirling 11.738 12.090 12.453 12.826 49.106
West Dunbartonshire 12.201 12.567 12.944 13.333 51.046
West Lothian 17.933 18.471 19.025 19.596 75.026
Total 702.470 723.544 745.250 767.608 2938.872
Page 64

Page 65

4.12 The Housing Service are continuously looking for opportunities to provide
additional new build council homes and will bring any potential site to the
Housing and Communities Committee with as much information as possible
as part of the regular More Homes update paper. 
5. People Implications 
5.1 The delivery of the More Homes delivery programme is managed through
existing resource within the Housing Development & Homelessness team
funded from the Housing Capital Investment Programme.   
6. Financial and Procurement Implications 
Financial 
6.1 The Council has to date delivered 586 new homes for social rent; these
additional homes bring council tax revenue of around £815k per year to West
Dunbartonshire Council. 
6.2 On 4 March 2026 supported by tenant representatives the Council approved
the Housing Capital Programme 2025-2030 which saw appropriate resources
committed to the delivery of new council homes in West Dunbartonshire.  An
expenditure budget of £99.675m for the affordable housing supply programme
inclusive of acquisitions is factored into the 5-year HRA Capital Programme. 
As it currently stands, it is anticipated that this programme will complete within
project life budget. 
6.3 Housing and Finance Officers will continue to assess the ongoing affordability
of future developments within the context of the Housing Revenue Account
Business Plan. 
Procurement 
6.4 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted within 4.8 of this report will
continue to be prioritised. Where the contract award is less than £213,000,
authority is delegated to the Chief Officer in consultation with the Procurement
Manager to instruct the award of contracts for the planned revenue and
capital spend detailed in this report to suppliers providing the most
economically advantageous offer to the Council. 
6.5 All procurement activity conducted by the Council more than £2m is.
subject to a contract strategy. The contract strategy for new housing
development within the HRA Capital Programme will be developed by the
Corporate Procurement Unit in consultation with Housing Development
Officers. The contract strategy will include but is not limited to; contract scope,
service forward plan, the market, procurement model, and routes – including
existing delivery vehicles, roles and responsibilities, risks, issues and
opportunities and on-going contract management. Opportunities to maximise
Page 65

Page 66

the positive social, economic, and environmental impact for the Council
through the relevant procurement processes will be developed in line with
procurement policy. 
7. Risk Analysis 
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis. 
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel. 
7.3 Housing supply continues to be the key factor in terms of the national and
local housing emergencies and if not increased and/or demand reduced it will
lead to continued pressures on other Council and Health and Social Care
Partnership service areas such as Homelessness which will have negative
financial implications for the wider Council’s general fund.   
8 Environmental Sustainability 
8.1  The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy. 
9. Equalities Impact Assessment (EIA) 
9.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment. 
10. Consultation 
10.1 As part of a rent consultation exercise in 2025, 92% of respondents indicated
their support for the Council’s ambitious plans to deliver the Housing Revenue
Account (HRA) new council house build programme. In addition, there was
positive support for the wider delivery of new build housing as part of the
current Local Housing Strategy.  Regular updates on new build development
are provided to the West Dunbartonshire Tenants and Residents Organisation
at the bi-monthly liaison meetings. 
11. Strategic Assessment 
Page 66

Page 67

11.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire. 
11.2 Having considered all the Council’s strategic priorities, this report, and the
provision of new supply social housing for rent contributes greatly to all the
Council’s strategic priorities. 
Peter Barry
Chief Officer, Housing 
Date: 30 July 2026 
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk 
Mikayla Deeley, Senior Housing Development Officer,
Housing Development and Homelessness Team,
Housing and Employability: email mikayla.deeley@west-
dunbarton.gov.uk 
Appendices: None 
Background Papers: West Dunbartonshire Council’s Local Housing Strategy 
West Dunbartonshire Council’s Strategic Housing
Investment Plan 
West Dunbartonshire Council’s Strategic Housing
Investment Plan, Feedback Report, Scottish Government,
May 2026     
Local Housing Strategy, Health Inequalities Impact
Assessment 
Wards Affected: All 
Page 67

Page 68

Page 68

Page 69

Official
WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer, Housing 
Housing and Communities Committee: 12 August 2026
___________________________________________________________________ 
Subject:       Scottish Social Housing Charter/Regulation of Social Housing in
Scotland Annual Update Report 
1. Purpose 
1.1 This purpose of this report is to provide the Housing and Communities
Committee with the annual progress report on meeting the requirements of the
Scottish Social Housing Charter and the Scottish Housing Regulator’s
Regulatory Framework for social housing, including the approval of our Annual
Assurance Statement. 
2. Recommendations 
2.1 It is recommended that the Housing and Communities Committee: 
(i) Notes the content of our current Engagement Plan published by the
Scottish Housing Regulator on 2 April 2026. 
(ii) Notes our performance in terms of achieving the Scottish Social Housing
Charter outcomes during 2025/26. 
(iii) Notes that a comprehensive assessment of 2025/26 performance has been
carried out and that this has informed our Charter Improvement Plan for
2026/27, with key areas of focus for the Housing Improvement Board
outlined at 4.16 of this report. 
(iv) Notes that our Annual Charter Performance Report for tenants and other
customers based on 2025/26 performance, will be produced and published
by the end of October 2026, as per the regulatory requirement. 
(v) Approves our Annual Assurance Statement attached as Appendix 1, to be
signed by the Housing Convener on behalf of the Committee and submitted
to the Scottish Housing Regulator as per the regulatory requirement, and 
(vi) Agrees that a further progress report on the Scottish Social Housing
Charter be submitted to the November 2026 meeting of the Committee,
which will include benchmarking data comparing our performance against
all local authorities in Scotland. 
3. Background 
3.1 The Scottish Government’s first Scottish Social Housing Charter (SSHC) came into
force in April 2012. This was reviewed during 2016 and again in 2021 and the 
ITEM 11   
Page 69

Page 70

Official
resulting revised SSHC was approved by the Scottish Parliament and has effect
from 1 November 2022. 
3.2 The purpose of the SSHC is to help improve the quality and value of the services
that social landlords provide by: 
• Stating clearly what tenants and other customers can expect from social
landlords and helping them to hold landlords to account.
• Focusing the efforts of social landlords on achieving outcomes that matter to
their customers, and,
• Providing the basis for the Scottish Housing Regulator (SHR) to assess and
report on how well landlords are performing. 
3.3 The SHR published a revised Regulatory Framework and associated statutory
guidance for social landlords in February 2024 which has effect form 1 April
2024. 
3.4 In response to feedback from stakeholders, much of the previous Framework
was maintained, though a new provision was introduced to allow the SHR to
require landlords to provide explicit assurance on specific issues in their Annual
Assurance Statement (AAS). 
3.5 The Regulatory Framework reporting timetable is outlined below: 
When Who What
Throughout year
Housing Improvement
Board/Tenant
Representatives
Assess performance against the Charter
Outcomes
May each year  Housing Development  Submission of Annual Return on the Charter
(ARC) to the Scottish Housing Regulator
August each
year
Scottish Housing
Regulator
Publish a report about each social landlord with
key data from its ARC on their website
October each
year
Convener of Housing
and Communities
Committee
Submission of Annual Assurance Statement
(AAS) to the Scottish Housing Regulator
October each
year Housing Development  Publication of annual Charter Performance
Report for tenants and other customers
by April each
year
Scottish Housing
Regulator 
Publish an Engagement Plan for each landlord,
highlighting areas where they are seeking
further assurance, based on performance
against Charter Indicators and outcomes and
compliance with statutory obligations
by April each
year
Scottish Housing
Regulator 
Publish a report on the analysis of the sectors’
performance in achieving the Charter Outcomes 
3.6 On the 6 August 2014, Members of the Housing and Communities Committee
agreed that twice yearly reports be provided as follows: 
• August Committee - Scottish Social Housing Charter Annual Update Report, and,
• November Committee - Scottish Social Housing Charter Annual Benchmarking
Report and Mid-Year Progress Report – (April-September). 
Page 70

Page 71

Official
3.7 The level of detail provided to the Committee in relation to performance and
compliance with the Regulatory Framework should be proportionate and not
overly burdensome. The current bi-annual reporting cycle should be continually
considered by Members, with the knowledge that more frequent reports can be
provided if this is deemed appropriate. 
4. Main Issues 
4.1 The key areas of focus in relation to the Scottish Social Housing Charter and
Regulatory Framework covered in this report are:
• The publication by the SHR of West Dunbartonshire Council’s Engagement
Plan for 2026/27.
• The submission of our Annual Return on the Charter (ARC) to the SHR and
assessment of our performance in relation to achieving the Charter
Outcomes.  
• The production and publication of our Annual Charter Performance Report
for tenants and other customers.
• The submission of our Annual Assurance Statement to the SHR, and,
• The continued development of effective tenant scrutiny arrangements in
conjunction with tenants and other customers. 
Engagement Plan 
4.2 The SHR continues to operate a risk-based approach to inform its engagement
with social landlords. As part of the Regulatory Framework the SHR publishes an
Engagement Plan for all social landlords based on their annual ARC submission,
and for local authorities, their homelessness statistical data submissions to the
Scottish Government. 
4.3 Our most recent Engagement Plan published on 2 April 2026 states that the SHR
will engage with the Council about tenant and resident safety. This is due to the
significant number of West Dunbartonshire’s tenants’ homes that do not fully
comply with electrical safety requirements, which came into force in early 2022
and form part of the Scottish Housing Quality Standard (SHQS). 
4.4 Specifically, this relates to the requirement for each property to have a valid
Electrical Installation Condition Report (EICR) in place, and which needs
renewed at least every 5 years. The is a key area of focus for the housing
service and we are providing the Regulator with monthly updates in terms of our
compliance and projections. 
4.5 This is the only issue that we currently are required to provide additional
assurance around, with levels of tenant satisfaction, the management of our
Gypsy/Traveller site and services to people that are homeless, no longer
highlighted as areas of concern. 
4.6 We are required to make our Engagement Plan easily accessible to tenants and its
publication is highlighted annually in the Housing News and is also available via
the West Dunbartonshire Council website. 
Page 71

Page 72

Official 
ARC submission and assessment of performance against the Charter Outcomes 
4.7 West Dunbartonshire Council successfully submitted our ARC with 2025/26
performance data to the SHR within the timescale outlined in the Regulatory
Framework. This process included both internal and external validation
processes, with the Housing Service engaging with Scotland’s Housing Network
in terms of a robust external validation of our data. 
4.8 The SHR uses these Charter Performance Indicators, alongside data relating to
homelessness submitted to the Scottish Government, to monitor the delivery of
housing and homelessness services against the Charter outcomes and
standards. 
4.9 The SHR is due to publish a Landlord Report on their website for each Scottish
social landlord at the end of August 2026 and this report will contain important
data from the ARC (18 key indicators) and will compare our performance with a
Scottish average figure across all social housing landlords operating in Scotland. 
4.10 Performance in 2025/26 against these key indicators and additional indicators
that our tenants and customers have informed us are the most important to them
is outlined in the table below. 
Table Key Index 
Annual Target Achieved  Positive Performance Trend 
Annual Target Almost Achieved
(within agreed parameter)   Negative Performance Trend 
Annual Target Not Achieved  No change from previous year
Overall Satisfaction
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target Trend Target
met
% of tenants satisfied with the
overall service 87.0%* 87.0%* 79.5%  
Communication
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target Trend Target
met
average time in working days to
respond in full to complaint - Stage 1 6.84 days 7.03 days 5 days  
average time in working days to
respond in full to complaint - Stage 2 24.0 days 19.9 days 20 days  
% of tenants who feel their landlord
is good at keeping them informed
about their services 
86.8%* 86.8%* 82.9%  
Participation
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of tenants satisfied with the
opportunities given to participate in
decision making process
87.2%* 87.2%* 80.9%   
Page 72

Page 73

Official
Quality of Housing
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of stock meeting the Scottish
Housing Quality Standard (SHQS) 69.84% 81.66% 86.2%  
% of existing tenants satisfied with
the quality of their home 87.8%* 87.8%* 79.1%  
Repairs and maintenance
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
Average length of time taken to
complete emergency repairs  5.09 hours 4.59 hours 4 hours  
Average length of time to complete
non-emergency repairs 12.16 days 10.9 days 9.7 days  
% of tenants satisfied with the
repairs and maintenance service 88.3% 90.05% 91.8%  
Tenant Safety
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
Number of times the statutory
obligation to complete a gas safety
check was not met in the reporting
year
0 0 0  
How many times did not meet the
requirement to complete an EICR
within five years of the last EICR?
New
indicator 2770 0  
Number of homes that do not have
‘satisfactory equipment for detecting
fire and giving warning in the event
of fire or suspected fire’
New
indicator 27 0  
average time taken to resolve cases
of damp and/or mould
New
indicator 17.94 days No target
set  
% of resolved cases of damp and/or
mould that were reopened
New
indicator 10.2% No target
set  
Estate management, Antisocial behaviour
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of Anti-Social Behaviour cases
resolved 96.56% 97.63% 96%  
% of tenants satisfied with the
landlord’s contribution to the
management of the neighbourhood
they live in.
86.0%* 86.0%* 78.9%  
Access to housing
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of tenancy offers refused 42.5% 40% 40%  
Tenancy sustainment
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of new tenancies sustained for
more than a year 91.1% 92.3% 93%  
The average time to complete
medical adaptations 46.5 days 60.9 days 40 days   
Page 73

Page 74

Official
Homelessness
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
Incidences of homelessness in West
Dunbartonshire 994 1053 1149  
% of homeless cases with decision
within 28 days of presentation 99.1% 99.2% 95%  
% of all homeless cases re-assessed
within 12 months (repeat homeless) 4.2% 4.3% 4%  
% of households requiring temporary
accommodation to whom an offer
was made
100% 100% 100%  
% of temporary accommodation
offers refused 4.4% 6.1% 10%  
Breaches of the Unsuitable
Accommodation Order (UAO) 26 43 0  
Value for Money – Rent Collection
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
Rent collected as a % of total rent
due 99.58% 99.96% 99.4%  
Gross rent arrears as a % of rent due  8.81% 8.46% 9.3%  
% of tenants who feel that the rent
for their property represents good
value for money
85.6%* 85.6%* 79.1%  
Value for Money – Void Management
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of rent due lost through properties
being empty 0.85% 0.69% 0.85%  
Average length of time taken to re-
let properties 25.94 days  23.19 days 25 days  
% of tenants satisfied with the
standard of their home moving in 67% 67% 71%  
Gypsy Travellers
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of Gypsy Travellers satisfied with
the landlords’ management of site 94.1%* 94.1%* 90%  
Factored Owners
Indicator Description 2024/25
Value
2025/26
Value
2025/26
Target
Trend Target
met
% of factored owners satisfied with
the factoring service they receive 22.1% 14.7% 37%  
*The same satisfaction survey used for both years, so value is identical. 
4.11 Of the 34 key indicators outlined above, four of these are new indicators relating
to tenant safety and we are reporting performance against these measures for
the first time. 
4.12 Compared to the previous year, 23 of the remaining 30 indicators, or 77%,
maintained or improved performance. This is an improvement from last year
when 71% of the indicators showed an improvement from the previous year. 
Page 74

Page 75

Official
4.13 Of the 32 key indicators where an annual target was set, 19 met this target, with
another 7 narrowly missing target. Overall, this translates to 81% of these key
indicators either meeting or almost achieving target.   
Key areas of risk and for improvement: 
4.14 Our response to the Housing Emergency declared in West Dunbartonshire in
May 2024 remains a key priority for the Housing Service. Following the second
Housing Summit focusing on the housing emergency held in February 2026, our
action plan has been refreshed, and its implementation is being monitored by the
Housing Emergency Project Board. 
4.15 A comprehensive assessment of 2025/26 performance against the Charter
Outcomes has been undertaken, informing our annual Charter Improvement Plan
which was approved by the Housing Improvement Board (HIB) in May 2026. 
4.16 In addition to the failure to meet the requirement that all properties have a valid
EICR in place highlighted in our Engagement Plan, we are not yet fully meeting
the requirement that all properties have satisfactory equipment for detecting fire
and giving warning in the event of fire or suspected fire. 
4.17 Our 2025/26 performance data also shows a significant increase in the average
time taken to carry out medical adaptations and low satisfaction with the factoring
service provided to owners. Continued improvement around void management
also remains a key priority for the service. 
4.18 Within this context, the HIB agreed in May 2026 that in addition to quarterly
performance reports covering the whole service, it would closely monitor key
work-streams aimed at driving improvements in the following areas during
2026/27: 
• Tenant and resident safety (EICR and LD2 fire alarm compliance). 
• Services to people that are homeless (meeting the agreed 59% lettings
quota, limiting numbers in temporary accommodation and minimising
breaches of the Unsuitable Accommodation Order).
• Void management.
• Actions being taken to reduce the average time taken to carry-out medical
adaptations, and
• Actions being taken to improve the satisfaction of factored owners. 
4.19 Annual benchmarking data is due to be published by the SHR by the end of August
2026 and the Housing Improvement Board will review annual targets for 2026/27
based on this data and which will challenge the housing and homelessness service to
meet our ambition to be one of Scotland’s top performing landlord organisations. 
Production and publication of Annual Charter Performance Report 
4.20 The SHR requires all social landlords to produce an Annual Charter Performance
Report for their tenants and other customers no later than 31 October each year. 
Page 75

Page 76

Official 
4.21 The Regulator states that the report should include: 
• An assessment of performance in delivering the Charter Outcomes.
• Relevant comparisons with previous years, other landlords and national
performance, and,
• How and when the landlord intends to address areas for improvement. 
4.22 In preparation for our first report, a working group of tenants and officers was
established and successfully: 
• Agreed how tenants wished to be involved.
• Agreed which indicators should feature in the report, and
• Agreed the best style and format to ensure that the report is user friendly and
easy to understand. 
4.23 This engagement was repeated during 2020 when the revised Charter came into
effect and was undertaken again in a series of meetings held in June 2026,
following this first year of reporting of the revised Charter Indicators introduced
by the SHR. 
4.24 This has again influenced the style, content, and format of the report, with the
indicators included being fully revised based on what tenants have told us are
the most important to them, a substantially reduced narrative within the report
and different symbols being used to compare performance to previous years and
to other landlords which are deemed simpler and easier to understand. 
4.25 Our Annual Charter Performance Report for 2025/26 based on this revised format
will be published online by the end of October 2026 and a copy will be sent to every
tenant with the winter edition of the Housing News. The report will also be sent to
tenants’ groups. interested tenants, partner organisations, and all elected members. 
Annual Assurance Statement 
4.26 The Regulatory Framework requires all social landlords to submit an Annual
Assurance Statement (AAS) to the SHR by the end of October each year. 
4.26 The AAS requires landlords to state that: 
• They are meeting the standards and outcomes outlined in the SSHC.
• That they are compliant with their statutory and regulatory obligations relating
to housing and homelessness.
• That they are compliant with their statutory and regulatory obligations relating
to equality and human rights, and,
• That they are compliant with their statutory and regulatory obligations relating
to tenant and resident safety. 
Page 76

Page 77

Official
4.27 Any areas of material non-compliance should be highlighted in the AAS
alongside the details of the actions being taken to address these issues. 
4.28 We have conducted a process of reviewing and updating our AAS informed by
the completion of an AAS self-assurance toolkit attached as a background paper
to this report. 
4.29  This completed toolkit allows us to assess how we comply with our wider legal
and regulatory obligations relating to housing and homelessness, equality and
human rights and tenant and resident safety. 
4.30 The toolkit also outlines the arrangements that are in place to provide the
Housing and Communities Committee with the assurance and evidence that we
are meeting these regulatory and statutory obligations which is proportionate and
not overly burdensome, as per the SHR guidance. 
Equality and human rights 
4.31 In keeping with the key messages from Scottish Government’s programme for
Government, equality and human rights are central to our delivery of our Local
Housing Strategy (LHS). The development of the strategy has been underpinned
by West Dunbartonshire Council’s commitment to promoting and sustaining
equality and inclusion, and equality and diversity principles. 
4.32 We worked closely with the West Dunbartonshire HSCP in piloting a Health
Inequalities Impact Assessment Tool, with each of the five themes being
separately assessed and these assessments contributing to the final version of the
LHS. 
4.33 An Equalities Impact Assessment (EIA) is used for any new and developing
policies. During 2021/22 we reviewed and updated our approach to collection of
Equalities data based on published guidance and continue to monitor that this is
being effectively implemented. Improved data held across all protected
characteristics continually improves the robustness of EIA’s that are carried out. 
Tenant and resident safety 
4.34 Our obligations around tenant and resident safety are monitored closely by
Building Services. This includes areas such as gas safety, electrical safety, fire
safety, lift safety, asbestos safety, water safety and damp and mould. 
4.35 There are currently no cases being investigated by the Health and Safety
Executive (HSE) relating to the safety of our tenants and residents and there
have been no cases investigated during the past year. 
4.36 The detail of our approach to tenant and resident safety is outlined in the AAS
self-assurance toolkit and we are satisfied that we are meeting our statutory
obligations except for the lack of compliance with the requirement that all
properties have a valid Electrical Installation Condition Report in place and with
the requirement that all properties have satisfactory equipment for detecting fire
and giving warning in the event of fire or suspected fire. 
Page 77

Page 78

Official 
4.37 An EICR is completed in every property that becomes vacant, in properties that
have any major electrical works, or capital improvement works completed and
we have an on-going contact process in place for those properties without a valid
EICR in place. 
4.38 Our current assessment is that the primary constraint to achieving full
compliance is access to properties, rather than contractor capacity or resource
availability. Properties without gas appliances present a greater challenge, as
tenants are less accustomed to cyclical servicing visits and our engagement
levels are lower. 
4.39 To address this, we are strengthening our approach to tenant engagement and
access. This includes enhanced communication with tenants, alongside the use
of formal legal access procedures where all reasonable attempts to gain access
have been exhausted. These measures are applied proportionately and as a last
resort, and we are increasing the level of activity in this area where appropriate
to support continued progress. 
4.40 A targeted programme of persistent engagement is also underway, including
direct contact and cold calling, to secure access to complete the installation of an
LD2 fire alarm system in the few remaining properties where this remains
outstanding. 
4.41 A letter from the SHR received in March 2026 stated that for this year, there is a
request that all Scottish social landlords provide specific assurance on the stock
data they hold and for those who have a Gypsy/Traveller site, assurance that
they meet the Scottish Government’s minimum compliance. The relevant
assurance that we meet the requirements around both these areas has therefore
been included in our Annual Assurance Statement as requested. 
4.42 Based on our performance against the Charter Outcomes and the information in
the AAS self-assurance toolkit, the following areas of material non-compliance
have been identified and have been highlighted in our AAS attached as
Appendix 1: 
• Tenant and resident safety:
➢ Failure to meet the requirement that all properties have a valid EICR in place.
➢ Failure to meet the requirement that all properties have satisfactory equipment
for detecting fire and giving warning in the event of fire or suspected fire.
• Lack of compliance with homelessness duties due to reported breaches of the
Unsuitable Accommodation Order. 
4.43 As outlined in the SHR guidance, the AAS is a short, succinct document, in a
simple format and highlights actions being taken to address these areas of non-
compliance.  
4.44 The central aspect of the AAS is that the Committee has been provided with the
necessary assurance in terms of information and evidence where required, to
support the content of the AAS. 
Page 78

Page 79

Official 
4.45 Following the AAS being approved by the Committee, it should be signed by the
Convenor and submitted to the SHR as per the regulatory requirement. As per
SHR guidance, it will then be published to ensure that it is accessible to tenants
and other customers. 
Tenant Scrutiny Arrangements 
4.46 The statutory Regulatory Framework for housing and homelessness services
demands that tenants participate in scrutinising landlord performance against the
Charter and requires that: 
• The form of involvement has been agreed with tenants.
• Involvement is effective and meaningful and that tenants have a real say in
assessment of performance.
• The approach is publicised to tenants; and
• Landlords’ can demonstrate the agreed approach was implemented. 
4.47 Developing effective tenant scrutiny is therefore a challenging process, however
following support from the Scottish Government’s “Stepping Up to Scrutiny”
training programme in which elected members took part, these requirements
were successfully met and in November 2014 the Housing and Communities
Committee approved the establishment of our Tenant Scrutiny Panel with clear
terms of reference. 
4.48 The Scrutiny Panel has subsequently carried out the following scrutiny exercises: 
• 2014/15 looking at our Anti-Social Behaviour Service.
• 2015/16 looking at our Repairs Service.
• 2016/17 looking at tenancy sustainment, specifically the new tenant visit
process.
• 2017/18 looking at SHQS compliance, specifically the number and reasons
that properties that are held in abeyance.
• 2018/19 looking at the timescales taken to complete medical adaptations.
• 2020/21 looking at the complaints process and time taken to respond to
complaints.
• 2022/23 looking at new tenant visits, and,
• 2024/25 looking at the processes around reporting repairs. 
4.49 All of the recommendations made in the Panel’s eight reports to date were
approved by the HIB and progress in terms of implementing these are monitored
and regular feedback provided to the Scrutiny Panel. 
4.50 The Panel were provided a briefing in June 2026 on our 2025/26 performance
and at the time of writing they are using this latest performance information to
consider the focus of their next scrutiny exercise. 
Page 79

Page 80

Official 
4.51 The Scrutiny Panel were successful in being shortlisted for a prestigious
Chartered Institute of Housing (CIH) excellence award and though narrowly
missing out, this was national acknowledgement of the work that they do to
ensure that tenant scrutiny is a valued part of WDC’s approach to performance
management. 
4.52 The West Dunbartonshire Tenants and Residents Organisation (WDTRO) also
continue to be heavily involved in the scrutiny of the Housing Service and in June
2025 received national recognition for their work when they were awarded
“Tenant Group of the Year” and “Outstanding Achievement Award” from the
Tenant Participation Advisory Service (TPAS). The WDTRO were also
shortlisted under the “Good practice in involving tenants to shape and improve
services award” category in 2026. 
4.53 The continuing work of the Joint Rent Group comprising tenants, Council officers
and the Convener of the Housing and Communities Committee, looking at the
rent setting process and the guidance in relation to the Housing Revenue
Account, remains important in ensuring Housing and Homelessness Services
provide best value for current and future tenants. 
5. People Implications 
5.1 There are no people implications because of this report. Delivery on the
requirements of the SSHC and Regulatory Framework is managed from within
existing staffing resources. 
6. Financial and Procurement Implications 
6.1 There are no direct financial or procurement implications in relation to this report.
The improvement plan informed by the Charter self-assessment exercise will be
delivered from within existing budgets. 
7. Risk Analysis 
7.1 There is a significant risk that failure to respond appropriately to the
requirements of the SSHC and the SHR’s Regulatory Framework would attract
an adverse reaction from the SHR and may have wider consequences for the
Council in the context of Best Value. 
7.2 At the time of writing we expect our next Engagement Plan to be published by
the SHR in March 2026. 
8. Equalities Impact Assessment (EIA) 
8.1 Equalities legislation requires that new or significantly changing policies or
services and financial decisions should be subject to an assessment of their
impact on the wellbeing of certain groups of people. The recommendations
within this report do not alter any existing policy or pattern of service delivery and
so is not considered to require an equalities impact assessment. 
9. Consultation 
Page 80

Page 81

Official 
9.1 The Council has in place a well-established and proactive tenant and residents’
organisational structure. The WDTRO meet with the Council (co-chaired by the
Convener of the Housing and Communities Committee) on a bi-monthly basis to
discuss all issues relating to the Housing Service. 
9.2 There remains a strong appetite among tenants and customers to continue to
participate actively to improve housing services in West Dunbartonshire. This is
reflected again most recently in the successful partnership approach adopted to
review and update our Annual Charter Performance Report and by the on-going
activities of the WDTRO, the Joint Rent Group the West Dunbartonshire Scrutiny
Panel. 
9.3 The Council is committed to ensure consultation continues and will support
arrangements to increase tenant scrutiny activities and assess our performance
in line with the requirements under the SSHC and the SHR’s Regulatory
Framework.  Our approach was commended via an external validation exercise
by the Tenant Participation Advisory Service (TPAS) Scotland, which again
awarded West Dunbartonshire Council a Gold Accreditation for excellence in
tenant participation in 2023. 
10. Strategic Assessment 
10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all five strategic priorities and specifically to improving local
housing and environmentally sustainable infrastructure. 
Peter Barry
Chief Officer, Housing.
Date: 20 July 2026
___________________________________________________________________ 
Person to Contact:        John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing Services. email: john.kerr@west-dunbarton.gov.uk 
Stefan Kristmanns - Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing
Services. email: stefan.kristamanns@west-dunbarton.gov.uk 
Appendices: 1. WDC Annual Assurance Statement August 2026 
Background Papers:     Scottish Social Housing Charter/Regulation of Social Housing
in Scotland Annual Update Report,
Report by Chief Officer, Housing,
Housing and Communities Committee, 20 August 2025. 
West Dunbartonshire Council, Annual Assurance Statement
August 2025. 
West Dunbartonshire Council | Scottish Housing Regulator 
Page 81

Page 82

Official 
Scottish Housing Regulator WDC Landlord Report 2024-25,
August 2025. 
West Dunbartonshire Council | Scottish Housing Regulator 
Annual Charter Performance Report for Tenants and other
Customers 2043/26, West Dunbartonshire Council, October 2025
Charter Performance Report | West Dunbartonshire Council
(west-dunbarton.gov.uk) 
Scottish Social Housing Charter Annual Benchmarking and
Mid-year Progress Report,
Report by Chief Officer, Housing,
Housing and Communities Committee, 19 November 2025. 
West Dunbartonshire Council’s Engagement Plan, Scottish
Housing Regulator, 2 April 2026
Engagement plan from 1 April 2026 to 31 March 2027 |
Scottish Housing Regulator 
AAS self-assurance toolkit 2026, West Dunbartonshire Council,
July 2026. 
“Involving You to Improve Housing Services” West
Dunbartonshire Council’s Tenant Participation Strategy 2025-
2028.
Tenant participation strategy | West Dunbartonshire Council 
The Scottish Social Housing Charter: Indicators and Context
Information, Scottish Housing Regulator         
https://www.housingregulator.gov.scot/landlord-
performance/national-reports/national-reports-on-the-scottish-
social-housing-charter/about-the-scottish-social-housing-
charter 
Wards Affected:             All     
Page 82

Page 83

Official 
August 2026 
West Dunbartonshire Council Annual Assurance Statement 
As Convenor of the Housing and Communities Committee I confirm that we have seen
appropriate evidence to give us assurance that: 
• We comply with all the relevant regulatory requirements set out in Chapter 3
of the Scottish Housing Regulator's Regulatory Framework.
• We are achieving all the relevant standards and outcomes outlined in the
Scottish Social Housing Charter, and
• We are compliant with all relevant legislative duties associated with housing
and homelessness services, tenant and resident safety and equality and
human rights. 
We comply with all the above requirements except for the areas set out below: 
Tenant and resident safety 
Tenant safety within the Councils’ housing stock is one of our main priorities and a key
concern remains in terms of our rate of compliance with the Scottish Housing Quality
Standard. The key driver for this is the number of properties without a valid Electrical
Installation Condition Report (EICR). 
Our current assessment is that the primary constraint to achieving compliance is access
to properties, rather than contractor capacity or resource availability. Properties without
gas appliances present a greater challenge, as tenants are less accustomed to cyclical
servicing visits and our engagement levels are lower. To address this, we are
strengthening our approach to tenant engagement and access. This includes enhanced
communication with tenants, alongside the use of formal legal access procedures where
all reasonable attempts to gain access have been exhausted. These measures are
applied proportionately and as a last resort, and we are increasing the level of activity in
this area where appropriate to support continued progress. The formal legal access
approach has had a positive impact in ensuring tenant engagement and we will continue
to monitor this as it may accelerate our full compliance projection. As agreed, we will
continue to provide monthly updates on our EICR position after each Better Homes
Board. 
In our 2025/26 ARC submission, we also reported that we had 27 properties without
satisfactory equipment for detecting fire and giving warning in the event of fire or
suspected fire. A targeted programme of persistent engagement is underway, including
direct contact and cold calling, to secure access to complete installations. 
Lack of compliance with homelessness duties 
Pressures around the homelessness system was one of the key contributing factors to us
declaring a Housing Emergency within West Dunbartonshire in May 2024. Challenges 
ITEM 11 -
APPENDIX 1
Page 83

Page 84

Official
remain in terms of the time being taken to move households experiencing homelessness
into settled accommodation and the subsequent pressures which exist in terms of
providing suitable temporary accommodation. 
Whilst we continue to meet most of our homelessness duties including our statutory
responsibility of offering temporary accommodation to those that need it, we reported 43
breaches of the Unsuitable Accommodation Order (UAO), during 2025/26. 
This remains a key area of focus, and we have a number of actions in both our Housing
Emergency Action Plan and Housing Solutions Strategy which aim to ensure that we are
doing all that we can to minimise any future breaches of the UAO. 
Specific assurance on areas requested by the SHR. 
A letter from the SHR dated 19 March 2026 outlined that in our AAS to be submitted
this year we should provide specific assurance on the following areas: 
Data on homes: 
West Dunbartonshire Council holds good quality information on the components and
condition of all its housing stock, maintained within the Council's Housing Quality
database. This data actively informs our SHQS compliance programme, five-year
investment planning and tenant and resident safety obligations. 
In 2025/26, over 2,150 major component renewals were completed, each informed
by and recorded within our housing quality database. Component condition data is
updated continuously through routine stock condition survey updates, planned
maintenance inspections, wider responsive repairs assessments and tenant home
visits.   
Our homes with major component elements approaching end of life are identified
through regular data analysis and incorporated into our rolling five-year housing
capital investment programme, with acceleration applied where required to manage
risk within available resources. 
We recognise, however, that data information on the stock condition is limited to a
small number of Housing Officers and we are in the process of incorporating our
stock data fully within our integrated housing management system, and we anticipate
that our programme to deliver this will be complete in December 2026. 
This will further enhance our approach to stock data/information; however, we are
satisfied that our data on homes is of sufficient quality and completeness to underpin
our asset management decisions, support financial planning within the Housing
Revenue Account, and provide assurance on tenant and resident safety. 
Compliance with the Scottish Government’s minimum site standards for
Gypsy/Traveller sites: 
We have a rolling programme of 6-monthly site inspections which continuously
assesses compliance with the Scottish Government’s minimum site standards. A site
inspection report is completed and any actions identified to maintain compliance are
actioned to ensure compliance is maintained. We are therefore assured that we have
Page 84

Page 85

Official
an approach in place which ensures our site maintains compliance with the minimum
site standards. 
We have active engagement with the residents of our Gypsy Traveller site via our
Tenant Participation Team, and we have a dedicated Gypsy Traveller Support Co-
ordinator based at the site to more effectively engage with residents on a day-to-day
basis in the most appropriate way. Meetings are held monthly to keep the residents
updated on issues of interest to them and a newsletter styled minute is produced and
then printed and shared. The style and format of this newsletter was developed in
conjunction with site residents. 
Our Annual Assurance Statement was considered at a meeting of the Housing and
Communities Committee on 12th August 2026 and was formally approved and
subsequently signed by me as Convenor. 
Councillor Gurpreet Singh Johal,
Convenor, Housing and Communities Committee 
12th August 2026
Page 85

Page 86

Page 86

Page 87

Official 
WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer, Housing 
Housing and Communities Committee: 12 August 2026
___________________________________________________________________ 
Subject:   More than a Roof - West Dunbartonshire’s Housing Solutions
Strategy update and new approaches to homelessness progress
report. 
1. Purpose 
1.1 The purpose of this report is to provide members with an update on the delivery of
“More than a Roof”, West Dunbartonshire Council’s Housing Solutions Strategy for
2025-28, including progress made during Year 1, the proposed Year 2 delivery
plan, the continued pressures arising from the local and national housing
emergency, the proposed 2026/27 homeless lettings target, and the allocation and
use of Scottish Government Housing Solutions funding. 
2. Recommendations 
2.1  It is recommended that the Housing and Communities Committee: 
(i) Note and agree the progress made and challenges experienced
during Year 1 of “More than a Roof” and agree the main
objectives proposed for Year 2 as set out in sections 4.28–4.48 of
this report 
(ii) Note that the Council’s housing allocation letting target for
homeless households is 59% for 2026/27 as set out in section
4.36 of this report 
(iii) Note that Scottish Government Housing Solutions funding of
£236,015 has been awarded for 2026/27 for the delivery of West
Dunbartonshire’s Housing Solutions Strategy; and  
(iv) Note continued uncertainty around future Housing Solutions
funding beyond 2026/27 and the need to review any ongoing
commitments in line with confirmed future funding. 
3. Background 
3.1 The Council’s approach to tackling homelessness is outlined in the Housing
Solutions Strategy “More than a Roof” and reinforced within the new Local
Housing Strategy approved by the Housing and Communities Committee in
November 2021. 
3.2     “More than a Roof” is West Dunbartonshire Council’s 6th Homeless Strategy   
with a strong focus on finding housing solutions for those households in need. 
This strategy covers the period from 2025 to 2028, which means it is aligned 
ITEM 12
Page 87

Page 88

Official          
with the current Local Housing Strategy which also runs until 2028. 
3.3     This approach aims to build on the achievements of “Home at the Heart”, WDC’s   
Rapid Rehousing Transition Plan. It has been developed within the backdrop of a 
Housing Emergency both locally and nationally. 
3.4     The strategy was developed in partnership with key stakeholders, including   
West Dunbartonshire Health and Social Care Partnership (HSCP) and the
wider Housing Solutions Partnership, which includes local            
Registered Social Landlords. In addition, in-depth consultation with households 
experiencing homelessness and staff working in the service were also carried           
out.  It was approved by the Housing and Communities Committee 
on 26 February 2025. 
3.5     Regular reports will continue to be provided to the Housing and Communities            
Committee to provide updates in terms of progress being made in the delivery              
of the Housing Solutions Strategy and approving the use of Scottish 
Government funding to deliver the key objectives. 
4. Main Issues 
4.1 In Year 1 good progress was made across prevention activity, Housing First,
supported accommodation review work, partnership protocols and housing
options advice. However, demand remains acute, with continued pressure on
temporary accommodation, limited supply of suitable one-bedroom
accommodation, increasing youth homelessness presentations and a projected
shortfall in lets required to meet need. The Year 2 plan therefore focuses on
strengthening prevention, improving move-on and support pathways,
maintaining a 59% lettings target for homeless households, managing
temporary accommodation pressures and making targeted use of available
Scottish Government funding. Future funding uncertainty remains a material
risk to longer-term delivery. The aims of “More than a Roof” in terms of tackling
homelessness are influenced by the Scottish Social Housing Charter and
consistent with the Scottish Government’s “Ending Homelessness Together”
approach and are structured around the following four strategic objectives: 
• Homelessness is prevented by providing good quality advice and information
to enable informed decisions on personal housing solutions;
• Where homelessness does occur, households are rehoused quickly; 
• Review and ensure there are a wide range of support services available to
prevent and end homelessness; and 
• Working with partners to provide interim options for temporary
accommodation and providing best quality temporary accommodation where
required. 
“More than a Roof” Year 1 Progress 
4.2    In order to achieve these objectives over the three-year period the following   
actions have been taken in Year 1: 
Page 88

Page 89

Official 
Objective 1: Homelessness is prevented by providing good quality advice and
information to enable informed decisions on personal housing solutions.   
4.3      A variety of measure have continued to be used to prevent homelessness in       
West Dunbartonshire. There has been a delay in the homeless service redesign
to a housing solutions focus however this has now been concluded and is
beginning to progress, including work around reviewing the Council’s delivery
of housing options interviews and personal housing solutions plans 
4.4   The Prevention Officer has continued to engage with households at risk of
homelessness. This had included managing the Prevention Fund which in Year
1 made payments directly to two households totalling £1000. Since the fund
began a total of £30,200 has been made in payments to help ensure that 75
existing tenancies have been sustained and homelessness prevented. 
4.5   The number of approaches to WDC’s Housing Options service increased
significantly in 2021/22 linked to the Tenant Hardship Fund with high demand
continuing in 2022/23 and 2024/25. Despite a 25% reduction in approaches
during 2025/26, request for assistance remains high. 66% of cases have been
prevented from becoming homeless in Year 1.   
4.6  Since the end of emergency legislation banning evictions taking place in both
the social and private rented sector, there has been an increase in Section 11
notices, from 20 in 2020/21 to 150 in 2025/26. Of those where contact was
made and there was engagement with the household, homelessness was
prevented in 52% of cases, up from 51% last year. 
4.7     Work has started around reviewing our internal processes for rent arrears to 
prevent evictions and thus homelessness. This involves partnership working
with Housing Solutions, Housing Operations and Corporate Debt to identify
areas where we can help improve options and reduce arrears. 
4.8    The revised allocations policy which includes young people at risk of   
homelessness as an additional priority group continues to have a positive           
impact. Since its introduction in 2022, WDC have housed 69 young           
people through the scheme, with a further 7 awaiting a subsequent offer. Due to 
ongoing competing demands for limited 1 bed properties, there was a reduction 
in the number of young people being housed during 2025/26. The scheme has 
been successful in significantly reducing the levels of youth homelessness over 
recent years, however, 2025/26 saw an increase in the number of young people 
presenting as homeless to 245 from 203 the previous year. This relates to fewer 
young people approaching the prevention service for assistance, from 25% to 
19% and ongoing work around reviewing our Youth Housing Options approach. 
2018/19 2019/20 2020/21 2021/22  2022/23 2023/24 2024/25 2025/26
Prevent1 approaches 178 240 332 576 455 384 433 324
Prevent1 closures 177 221 249 378 654 385 461 349
% homelessness prevented 64% 57% 51% 52% 72% 67% 72% 66%
% closed with presentation 24% 26% 27% 31% 18% 25% 19% 22%
Page 89

Page 90

Official
4.9    As part of WDC’s work towards a Common Housing Register, Autumn 2025 
saw the roll out of the shared housing application form with steering group 
meetings held to track progress and discuss next steps in terms of phase 2 
which includes the change in circumstances form, medical assessments and an 
annual review being incorporated into the shared application process. At 
present 1 RSL has agreed to continue to a Common Housing Register via 100% 
nominations until a portal is developed for full roll out, while there are ongoing 
conversations with other RSL partners about a register and how that would work. 
4.10   Work has started around updating housing stock information and availability so 
that residents can make informed decisions. This involves reviewing          
and updating housing webpages to ensure accessibility and raising 
awareness of current stock, demand and turnover to manage expectations and   
allow residents to make realistic housing choices. 
Objective 2: Where homelessness does occur, households are rehoused
quickly. 
4.11   One of the key objectives of WDC’s Housing Solutions Strategy is to ensure            
that homeless households can access settled accommodation as quickly as 
possible. A key target is reducing the length of time homeless households with 
no/low support needs spend in temporary accommodation. 
4.12   Our Housing Solutions model considers the level of new homeless decisions,   
the backlog of homeless households, projected future demand, the number of            
lets made to homeless households and projected letting activity. The model 
uses this data to determine the number of lets that will be required for homeless 
households on an annual basis and determines a projected lettings % target. 
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL  
Year 1 target  Year 1 actual
Lets required to meet demand  693 676
Split LA 531 497
Split RSL 162 179
% Allocation of lets required  
LA 59% 55%
RSL 59% 39%   
4.13   RSL letting activity was significantly higher than projected (464 lets as opposed 
to 275 target). The RSL homeless letting target was reduced for 2025/26 to 
reflect the low turnover of available properties in previous years, as a result RSLs 
achieved slightly higher lets to homeless households than modelled but failed to 
meet the 59% target due to more overall lets. WDC letting activity was 
slightly higher than projected (905 lets as opposed to 900 target) but as it did not 
meet its allocation target of 59%, the number of lets to homeless households 
were lower than modelled as were Youth Prevention Lets, 1% as opposed to the 
5% target. 
Page 90

Page 91

Official
4.14  There are as at June 2026 275 households in temporary accommodation,
including 74 children. 56 households have been waiting longer than a year to be
housed and 34 of these households are in temporary accommodation. 
4.15   Despite this, the average times for 2025/26 decreased and we exceeded the
target of 16 weeks by consistently achieving an average of 15 weeks throughout
Year 1. 
4.16   Work continued around the promotion of our HomeSwapper service as an            
additional housing option for tenants. This involved regular adverts in tour 
quarterly Housing News and contacting tenants on the transfer list with no points 
to encourage them to register with the service, alongside tenants that we 
identified from our records as having a potential match. 
Objective 3: Review and ensure there are a wide range of support services
available to prevent and end homelessness.   
4.17   WDC’s Joint Mental Health, Addictions, Housing Solutions and Housing            
Providers Protocol has been reviewed in partnership with and rolled out across 
relevant services. The Protocol will provide a more effective, joined up approach 
to support WDC tenants and homeless clients to address their addiction and/or 
mental health needs and improve their tenancy sustainment opportunities/          
achieve sustainable housing solutions.   
4.18   Work has continued around updating WDC’s No Home for Domestic Abuse 
Policy in line with the Housing (Scotland) Act 2025 and Domestic Abuse 
(Protection) (Scotland) Act 2021, (Part 2 coming into force August 2026), which 
will also impact WDC’s rent arrears and tenancy agreement processes.   
4.19   Internal support processes have been reviewed and updated to ensure that 
they capture all support needs of households and there is a greater awareness 
of all available support options in West Dunbartonshire. This has included 
reviewing relevant paperwork, ongoing staff training and guidance around 
identifying support needs, ensuring support information is up to date and 
accessible in terms of webpages and discussions at wider stakeholder 
meetings around changes to support options and processes. 
Objective 4: Working with partners to provide interim options for temporary 
accommodation and providing best quality temporary accommodation where 
required. 
4.20    There continues to be a range of interim housing options available in West 
Dunbartonshire for homeless households with more complex support needs.             
This includes supported tenancies in the community, as well as residential 
supported accommodation where this need is identified.   
4.21    Residential supported accommodation offers temporary accommodation and on-           
site support to alleviate homelessness and enable homeless households to make 
a planned transition to settled accommodation. The recommendations of the 
Review of Supported Accommodation continued to be taken forward in Year 1       
by the lead officer. Review findings informed the decision to continue the existing   
Blue Triangle Supported Accommodation provision in Clydebank and Alexandria
Page 91

Page 92

Official           
through a direct award, and agree and implement the closure of the Bonhill 
service while securing suitable alternative supported placements for affected 
clients.   
4.22    The review has also helped clarify current provision, demand pressures and the 
need for improved monitoring, including KPIs and move on reporting. Monthly                         
Project Board meetings have also continued.   
4.23    There was a target of 30 conversions in Year 1, however only 15 were completed,           
as due to the continued demand for temporary accommodation the service can 
only offer what is available which results in a lack of choice on where households 
want to be permanently housed. 
4.24    Due to delays around the homeless service redesign, WDC’s Housing First 
service continued to operate at a reduced staffing capacity of 4 in Year 1. 
4.25    By the end of 2025/26, 7 new Housing First tenancies had been created and a 
further 11 clients are awaiting an offer of settled accommodation being made. 26 
tenancies are being sustained where the Housing First support has been 
“stepped down”, meaning a planned exit from the Housing First Service. While           
WDC’s Housing First approach continues to have a high overall tenancy 
sustainment rate, sadly 9 of these tenancies have ended due to the death of 
tenants.   
4.26     A review of the additional tendered Housing First Service was carried out in Year 
1 and due to positive feedback, it was decided that a new tender would be 
completed for a further 12 months, until February 2027. Due to service demand, 
additional Housing First funding was used to employ an additional Housing First 
Support Worker to allow for increased capacity. 
4.27    To further explore support and accommodation options for young people, a Pilot 
Young Persons Housing First Service was put out for tender and awarded 
to Blue Triangle at the end of Year 1. With the Young Persons worker now in 
post, there is capacity for an additional 10 young people to benefit from housing 
first support through this pilot.       
Year 2 Plan 
Objective 1: Homelessness is prevented by providing good quality 
advice and information to enable informed decisions on personal 
housing solutions. 
4.28    A variety of measures will continue to be used to prevent homelessness
within West Dunbartonshire. The homeless service redesign to a housing
solutions focus will progress in Year 2, which will review the Council’s delivery
of housing options interviews and personal housing solutions plans. 
4.29    The £16,363 unspent prevention fund from last year will be used to continue to        
support households at risk of homelessness in West Dunbartonshire, alongside 
the consideration of a Matched Payment Scheme approach to incentivise 
tenants to engage early and consistently with arrear repayment plans.   
Page 92

Page 93

Official
4.30    The continued monitoring of the revised allocations policy which creates young 
people at risk of homelessness as an additional group given a reasonable 
preference within the policy. A subgroup including Housing Solutions Partners 
will be developed to review our youth housing options approach and how we 
can work to further prevent young people from becoming homeless.   
4.31 Work will continue around the introduction of new prevention duties including
ensuring that partner agencies are aware of ‘Ask and Act’ partner 
responsibilities in preventing homelessness and reviewing and updating 
WDC’s nomination agreement to ensure a prevention focus. 
4.32    Work towards establishing a Common Housing Register will continue in Year   
2, with one RSL continuing towards a full Common Housing Register and others
remaining partners via the shared application form. 
4.33    Improving the advice and information available to residents will remain a key             
focus in terms of updating housing stock information and availability, working
with Housing Solutions Partners to further strengthen the advice and 
information available to residents and introducing a Housing Solutions Charter
and gaining accreditation for the provision of information and advice.   
Objective 2: Where homelessness does occur, households are rehoused
quickly. 
4.34    Due to exceeding the target time homeless households with no/low needs 
spent in temporary accommodation during 2025/26, the target will be reduced
to 15 weeks in Year 2. 
4.35 Currently modelling suggests that for 2026/27 for West Dunbartonshire, 77% of
all available social tenancies, inclusive of conversions and Housing First will
require to be allocated to homeless households to ensure targeted reductions in
temporary accommodation and faster access to settled accommodation is
achieved. 
4.36    While this will not be achieved, after recognising other housing need factors it 
would not be practical to have 77% allocation of lets to homeless households.      
Therefore, partners have been asked to agree a 59% lettings target to      
homeless households. This objective was supported by the Housing  
Improvement Board in terms of lets made by the Council and a similar
commitment was sought from RSL partners via their annual Housing Solutions 
Contribution Statements. 
4.37    There is also a shared desire to provide scope for an element of overall letting 
activity to be directed to prevent homelessness and reduce future demand. 
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL 
Year 2
Lets required for to meet demand  752
Split LA 531
Split RSL 221
Page 93

Page 94

Official
Projected turnover  Year 2
Split LA 900
Split RSL 375
% Allocation of lets required Year 2
LA 59%
RSL 59% 
4.38 As 59% is not enough to fully meet demand and clear the backlog of households
in temporary accommodation, this will result in a shortfall of around 224 lets and
fifty-five additional units required for temporary accommodation. 
4.39    If additional temporary accommodation units are required, this reduces lets      
available for mainstream offers and would also require additional staff 
resources to manage the additional units. 
4.40    Work will continue around exploring different housing options to meet housing 
need in West Dunbartonshire including working with RSL partners to consider 
the development of a common mutual exchange scheme and promoting and 
reviewing WDC’s downsizing scheme.   
Objective 3: Review and ensure there are a wide range of support services
available to prevent and end homelessness. 
4.41    Following the redesign of the homeless service, work will progress around 
embedding a new housing support service which will include working with key           
stakeholders to explore long term housing support options to promote tenancy           
sustainment and prevent homelessness, exploring options to fund and provide 
more informal and practical types of support for certain groups that would not fall 
into prescribed housing support and the creation of a youth specialist housing 
support team.   
4.42    In line with the homeless service redesign, work will continue around reviewing 
internal support processes to prevent and end homelessness in West 
Dunbartonshire.   
4.43    Partnership protocols with key stakeholders will continue to be monitored and 
reviewed, including WDC’s Joint Mental Health, Addictions, Housing Solutions 
and Housing Providers Protocol, our Domestic Abuse Protocol in line with 
legislative changes and our Prison Discharge process against SHORE standards. 
4.44   The creation of a Joint Kinship Care, Housing Solutions and Housing Providers 
Protocol will also be explored in Year 2.   
4.45    Continue to review our processes and practices to ensure they meet the needs of 
underrepresented groups, such as the LGBTQ+ community. 
Objective 4: Working with partners to provide Interim options for temporary
accommodation and providing best quality temporary accommodation where
required. 
Page 94

Page 95

Official
4.46   The review of Residential Supported Accommodation will continue to progress 
in Year 2 around the implementation of agreed actions, monitoring of outcomes 
and move on planning and the consideration of future supported 
accommodation needs. Monthly meetings with the Project Board will continue 
and an updated progress report will be presented to a future Housing and 
Communities Committee.   
4.47    The delivery of rapid access accommodation will be explored in partnership 
with HSCP colleagues which will involve jointly defining referral pathways, 
gathering information on service priorities and reviewing working protocols. 
4.48    Once the redesign of the homeless service has occurred WDC’s Housing First 
service will be back to full capacity of 8 staff members, enabling support to 
continue for the 23 active tenancies and the 11 waiting to be housed. 
Collaborative funding options will continue to be explored with HSCP partners 
as current funding does not allow the service to fully meet 
identified demand. Both the additional tendered Housing First Service and                       
Pilot Young Persons Housing First Service will be reviewed to decide whether 
to extend beyond 2026/27.   
Funding update   
4.49 In November 2025, as part of the Housing Emergency Action Plan, the Scottish
Government announced in its Programme for Government an additional £1
million Housing First funding uplift for 2025/26 to scale up the Housing First
approach nationally, alongside £3 million of Housing First Capital funding to
enable and support the acquisition of suitable properties for the delivery of
Housing First. It was also confirmed that a further £8 million would be provided
to local authorities to support their approaches to homelessness for 2026/27. 
4.50    WDC were allocated £25,863 as part of Housing First uplift funding which was 
used to extend and increase the external Housing First contract from 1 to 2 
workers for the rest of Year 1 and continue with 2 support workers in Year 2.             
The £92,137 allocation of Housing First capital funding has been used to bring 
an additional properties back into use as Housing First tenancies through the 
Council’s buyback scheme. 
4.51 The formula still being used to allocate local authorities share of this funding is
based on the number of homeless assessments made in a local authority area
over a three-year period. There has been some criticism of this approach as it
does not consider homelessness prevention work within the assessment. It can
therefore act as a disincentive to make the wider system changes advocated
within Ending Homelessness. 
4.52 The Scottish Government and COSLA had hoped to explore the possibility of
joining up the funding stream for preventing and responding to homelessness
with the rapid rehousing funding stream and to look at alternative distribution
formulas. However, this work has been delayed due to competing priorities. 
4.53    The same formula has therefore been used for the funding allocation for
2026/27. This formula has resulted in an allocation for West Dunbartonshire
Council of £236,015 to deliver Year 2 of our Housing Solutions Strategy which
Page 95

Page 96

Official
incorporates the Council’s approach to rapid rehousing. In addition, the Scottish
Government have also confirmed the funding allocation to West Dunbartonshire
Council for the provision of homelessness prevention and response
mainstream services, this is separate to the Housing Solutions funding and
provided within the Revenue Grant provided to local authorities by the Scottish
Government. 
Housing Solutions Year 2 funding 
Year 1 underspend £213,786
SG funding for Year 2 £236,015
Year 2 total funding £449,801 
4.54 A full review of Year 1 activities has been carried out, and the Year 2 Housing
Solutions plan has been refreshed to take account of available funding.
Housing Solutions Year 2 costings 
Housing First external service  £104,500
Housing First Youth Pilot  £53,900
Pilot Prevention Fund £16,363
Conversion Programme  £100,000
Downsizing Scheme  £70,000
Resettlement Support  £105,038 
Year 2 total cost £449,801 
4.55   With WDC’s Housing First service now being fully funded internally, this 
year’s additional Scottish Government funding will be used to pilot a
downsizing scheme and provide resettlement support. 
Housing Emergency 
4.56  The Council declared a housing emergency on 1st May 2024 due to the
extreme pressures facing housing and homelessness services within West
Dunbartonshire. A national housing emergency was declared by the
Scottish Government on 15th May 2024. 
4.57 An updated report on the progress of West Dunbartonshire’s Housing
Emergency Action Plan will be provided as a separate agenda item at the
Housing and Communities Committee on the 12th August 2026. 
5. People Implications 
5.1 Any additional post required to strengthen the team will be recruited in line with
the Council’s existing recruitment policy and will be funded from the Scottish
Government funding for the provision of homelessness prevention and response. 
6. Financial and Procurement Implications 
6.1 The Cabinet Secretary for Housing wrote to West Dunbartonshire on 11th
November 2025 advising of the Council’s Housing Solutions funding allocation
Page 96

Page 97

Official
for 2026/27 of £236,015. This funding will be included in the regular payments
of the 2026/27 General Revenue Grant. 
6.2 In addition the Scottish Government also confirmed the funding allocation to
West Dunbartonshire Council for the provision of homelessness prevention and
response mainstream services, this funding will be paid as part of the General
Revenue Grant payment, with the first payment in 2026/27 made on 1 April
2026.   
6.3 Further Housing Solutions funding beyond 2026/27 is unclear. Committee will
be updated at a future meeting once confirmed plans for future years are
received. 
6.4 The Year 2 delivery plan fully allocates the available Housing Solutions funding
of £449,801, comprising £213,786 Year 1 underspend and £236,015 Scottish
Government funding for 2026/27. Any activity or staffing commitment required
beyond the period covered by confirmed funding will require further review and
will be considered through future budget and service planning processes. 
6.5 There are no procurement implications in terms of this report. 
7. Risk Analysis 
7.1      There are financial, operational, reputational and regulatory risks associated
with not being able to fully deliver the Housing Solutions Strategy, including the
Housing First element of the approach. These risks are heightened by the local
and national housing emergency, continued demand for temporary
accommodation, limited social housing supply and the need to reduce the time
homeless households spend in temporary accommodation. 
7.2      If the 59% lettings target is not achieved, or if overall turnover is lower than
projected, there is a risk that the backlog of households in temporary
accommodation will increase, additional temporary accommodation units will
be required, and fewer lets will be available for mainstream housing need. This
could also increase staffing and management pressures and affect the
Council’s ability to demonstrate progress against housing emergency and
homelessness commitments. 
7.3      There is no confirmation of Housing Solutions funding beyond 2026/27. This
creates a risk that successful prevention, Housing First, resettlement support,
downsizing and temporary accommodation initiatives may not be sustainable
without future funding. Officers will continue to monitor expenditure, outcomes
and demand pressures and will report back to Committee once the future
national funding position is confirmed. 
8. Equalities Impact Assessment (EIA) 
8.1 There are no negative equalities impacts due to the implementation of WDC’s
Housing Solutions Strategy, however preventing and responding to homelessness
has a significant positive impact on individuals and communities. There are
potential positive impacts for some groups as noted in the EIA conducted for the
Housing Solutions Strategy in July 2026, EIA 1518. 
Page 97

Page 98

Official
9. Environmental Sustainability 
9.1  Our current and future approach to strategic housing asset management will
continue to prioritise a ‘zero carbon’ approach to decision making and
deliverability and this will be achieved through the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy. 
10. Consultation 
10.1    The Housing Solutions Strategy was developed in collaboration with key   
partners, including HSCP, local RSLs, third sector organisations, WDTRO 
(West Dunbartonshire Tenants and Residents Organisation) and households   
experiencing homelessness, via focus groups, surveys, staff meetings and             
community and stakeholder events. 
11.  Strategic Assessment 
11.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities. 
Peter Barry
Chief Officer, Housing 
Date: 29 July 2026
___________________________________________________________________ 
Person to Contact:       John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability, telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk 
Donna Kirkwood, Senior Housing Development Officer,                                         
Housing Development and Homelessness Team, Housing 
and Employability, email:                                         
donna.kirkwood@westdunbarton.gov.uk                                                                                             
Appendices: None     
Background Papers:     
Ending Homelessness Together – High Level Action Plan;
Scottish Government/COSLA
https://www.gov.scot/binaries/content/documents/govscot/
publications/publication/2018/11/ending-homelessness-
together-high-level-action-plan/documents/00543359-
pdf/00543359-pdf/govscot%3Adocument 
HARSAG2 recommendations tracker, West
Dunbartonshire Council Housing Development and
Homelessness Team, June 2026; 
Page 98

Page 99

Official 
Housing and Communities Committee Report 20th August
2025 “Rapid Rehousing Transition Plan and new
approaches to homeless update”; 
West Dunbartonshire Council Housing Emergency Action
Plan, July 2026; 
Letter from Mairi McAllan, MSP, Cabinet Secretary for
Housing on Distribution of Housing First RRTP Funding
Uplift for 2025/26 and funding of RRTPs for 2026/27; 11
November 2025; 
Letter from Mairi McAllan, MSP, Cabinet Secretary for
Housing on Distribution of Housing First Capital Funding
for 2025/26; 20 November 2025; 
“More than a Roof” West Dunbartonshire Council’s
Homelessness Prevention and Temporary
Accommodation Strategy 2017-2020. 
West Dunbartonshire Council’s Local Housing Strategy
2022-2027; 
West Dunbartonshire Council’s Revised Rapid Rehousing
Transition Plan including Action Plan and Equalities Impact
Assessment, Home at the Heart 
West Dunbartonshire Council’s Housing Solutions
Strategy, Action Plan and Equalities Impact Assessment,   
Housing Solutions Strategy 27.03.25 
Wards Affected:             All     
Page 99

Page 100

Page 100

Page 101

Official
WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Resources   
Housing and Communities Committee: 12 August 2026
___________________________________________________________________ 
Subject:  Housing Revenue Account Budgetary Control Report 
to 30 June 2026 (Period 03) 
1. Purpose 
1.1 The purpose of this report is to advise Committee on the 2026/2027 HRA
revenue budget position on 30 June 2026 and the forecast position for HRA
reserves on 31 March 2027. 
2.  Recommendations 
2.1 Members are asked to: 
i. note the HRA revenue account is forecasting a deficit of £0.863m. If required,
HRA reserves will be used to fund the deficit. 
ii. note that the forecast deficit would reduce HRA reserves to £0.259m on 31
March 2027, significantly less than the HRA revenue prudential target for 31
March 2027 of £1.222m. 
iii. note that work will continue to explore opportunities to remove the in-year
deficit and to rebuild reserves, including the targeting of efficiencies across
all areas of the HRA revenue account budget. 
3. Background 
Revenue 
3.1 The Council approved a 2026/2027 HRA revenue budget of £60.880m on the
4th of March 2026. A prudential reserve target of £1.222m was also set (2% of
the revenue budget). HRA prudential reserves were £1.122m on 31st March
2026.  
4. Main Issues 
4.1  This report advises committee of the key issues contributing to the Housing
Revenue Account (HRA) forecasting a 2026/27 deficit of £0.863m. The
forecast deficit would require a call on HRA reserves and leave forecast HRA
reserves of £0.259m on 31 March 2027. Using existing reserves to address
the funding deficit adds risk to the wider financial position of the HRA with
reduced capacity to absorb any unforeseen future costs until the HRA rebuilds
its reserves. 
4.2  There are a range of unfavourable / favourable variance contributing to the
forecast deficit and the main variances are detailed below. 
ITEM 13
Page 101

Page 102

Official
Adverse Variances > £50,000 
Central Support Allocation - £0.535m Adverse   
4.3 The draft outcome from the review of the Council’s Central Support Allocation
(CSA) model during 2025/26 assessed the appropriate allocation of corporate
support costs to service users including the Housing Revenue Account. The
review determined that the Housing Revenue account CSA charge was
understated and needed to be increased. The 2026/27 HRA CSA budget was
set based on the older recharge model. Consequently, the amount that will be
charged to the Housing Revenue Account in 2026/27 is projected to exceed
budget and create an overspend / adverse variance. 
Repairs & Maintenance - £0.410m Adverse   
4.4 There continue to be cost pressures due to the high demand across the
responsive repair and void service. A range of mitigations are in place to
minimise the cost pressure including tighter controls on contractor use and the
stringent application of the rechargeable repairs policy.   
Loan Charges - £0.221m Adverse   
4.5 The main cost pressure is a forecast increase in the interest payable on HRA
capital debt. The 2026/27 HRA estimates assumed a pooled interest rate of
4.25% on HRA capital debt on 31 March 2027. The current pooled interest
rate forecast is 4.4%, higher than estimated and creating a cost pressure. 
4.6 Members will be aware of the significant risk and uncertainty around
forecasting local authority borrowing costs and geopolitical events have
contributed to an increase in the interest rates payable on new temporary and
new Public Work Loans Board (PWLB) borrowing. Consequently, there is a
risk of a further increase to the pooled interest rate during 2026/27. 
Favourable Variance > £50,000 
Employee Costs - £0.335m Favourable. 
4.7 The favourable variance is due to savings from vacant posts across the
service and an increase in HRA employee costs recharged to non HRA
revenue services including homelessness and HRA capital. 
5. People Implications 
5.1 There are no people implications. 
6. Financial and Procurement Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report. 
Page 102

Page 103

Official
7. Risk Analysis 
7.1 The main financial risk is the HRA going into deficit due to unforeseen costs
being identified between now and the end of the financial year. The Housing
(Scotland) Act 1987 specifies that if a HRA deficit arises in any one year, the
local authority must make a General Fund contribution to make good the
deficit. In this event, the HRA would be expected to repay that contribution
from future HRA surpluses. 
8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 All services involved in delivering the HRA revenue budget have been
consulted during the compilation of this report. 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.    
Laurence Slavin
Chief Officer – Resources
Date: 12 August 2026
___________________________________________________________________ 
Person to Contact:  Jim McCarron - Business Unit Finance Partner 
Telephone: 07772 322055   
e-mail james.mccarron@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Budgetary Position (Revenue)    
Appendix 2 - Variance analysis (Revenue)
Page 103

Page 104

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2026/27
PERIOD END DATE 30 June 2026
Budget
2026/27
Spend to Date
2026/27
Forecast Spend
2026/27 Annual RAG Status
£000 £000 £000 £000 %
Employee Costs 9,224                             1,998                         8,961                         (263) -3% 
Property Costs 1,497                             379                            1,514                         17                              1% 
Transport Costs 207                                49                              203                            (4) 0% 
Supplies, Services And Admin 471                                113                            507                            36                              8% 
Support Services 2,845                             845                            3,380                         535                            19% 
Other Expenditure 392                                105                            373                            (19) -5% 
Repairs & Maintenance 12,688                           2,729                         13,098                       410                            3% 
Open Space Maintenance 730                                183                            730                            -                                0% 
Bad Debt Provision 1,269                             317                            1,269                         -                                0% 
Void Loss (Council Tax / Lost Rents) 1,108                             270                            1,081                         (27) -2% 
Loan Charges / CFCR 30,449                           7,668                         30,670                       221                            1% 
Total Expenditure 60,880                           14,656                       61,786                       906                            1% 
House Rental Income (60,000) (15,000) (60,000) -                                0% 
Lockup Rental Income (249) (62) (249) -                                0% 
Other Rental income (143) (53) (162) (19) 13% 
Factoring Income (452) (119) (477) (25) 6% 
Miscellaneous Income (36) (7) (35) 1 -3% 
Total Income (60,880) (15,241) (60,923) (43) 0% 
Net Expenditure 0 (585) 863 863 
Subjective Summary Forecast Variance
2026/27
ITEM 13 - APPENDIX 1
Page 104

Page 105

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2026
PERIOD 3
Budget
2026/27
Forecast
Spend
2026/26
£000 £000 £000 %
Employee Costs 9,224 8,961 (263) -3% 
Main Issues
Mitigating Action
Anticipated Outcome
Support Services 2,845 3,380 535 19% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2026/27
Forecast
Spend
2026/26
£000 £000 £000 %
Repairs & Maintenance 12,688 13,098 410 3% 
Main Issues
Mitigating Action
Anticipated Outcome
A draft review of the council’s Central Support Allocation (CSA) model during 2025/26
determined that the Housing Revenue account CSA charge was understated and needed to
be increased. The 2026/27 HRA CSA budget was set based on the older recharge model.
Consequently, the amount that will be charged to the Housing Revenue Account in 2026/27
will exceed budget and create an overspend / adverse variance.
The Housing Service will engage with central support service managers to explore cost
savings through the re-provisioning of services provided to the HRA.
A year end overspend.
A year end overspend.
Subjective Description
Responsive and planned repair and maintenance services to houses and lockups and income recovered from tenant rechargeable and
owner occupier repairs.
Variance Narrative
A high  volume of repair orders and ongoing inflationary pressures are driving up costs, with
the most significant pressure across responsive repair budgets.
Officers continue to put in place a range of mitigation measures to minimise the overspend,
including the transfer of qualifying repair spend to the HRA capital programme, primarily repair
works that extends asset lifespan.
Furthermore, Electrical Installation Condition Report (EICR) spend that is complementary to
the environmental sensor installation programme has also been funded from the HRA capital
programme.
Subjective Analysis Forecast Variance
2026/27
RAG
Status 
Variance Analysis
Subjective Description
Centrally funded support services that support HRA revenue service delivery. Services include Revenues and Benefits, Contact Centre, HR
Services, ICT Services, Corporate Administrative Support, Legal Services, Financial Services.
Variance Analysis
Subjective Analysis Forecast Variance
2026/27
RAG
Status
Subjective Description
Employees charged directly to the HRA.
Variance Narrative
Savings from vacant posts and an increased employee cost recharge to non HRA revenue
service areas will deliver an underspend.
None
A year end underspend
Variance Narrative
ITEM 13 - APPENDIX 2
Page 105

Page 106

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2026
PERIOD 3
Loan Charges / CFCR 30,449 30,670 221 1% 
Main Issues
Mitigating Action
Anticipated Outcome
Subjective Description
Loans Fund repayments and the payment of interest and expenses on outstanding HRA debt.
Variance Narrative
The main cost pressure is a forecast increase in the interest payable on HRA capital debt. The
2026/27 HRA estimates assumed a pooled interest rate of 4.25% on HRA capital debt at 31
March 2027. The current forecast is for the pooled interest rate to be 15 basis points higher
than estimated creating a cost pressure
Officers will continue to work with external  treasury advisors to structure council borrowing
and the loans portfolio in a manner that minimises debt servicing costs.
A year end overspend.
Page 106

Page 107

Official
WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Resources   
Housing and Communities Committee: 12 August 2026
___________________________________________________________________ 
Subject:  Housing Revenue Account (HRA) Capital   
Budgetary Control Report to 30 June 26 (Period 3) 
1. Purpose 
1.1 This report provides an update on the HRA capital programme to 30 June
2026. 
2. Recommendations 
2.1 Members are asked to: 
i) note the current position of the 2026/27 HRA capital budgets and the 5-
year HRA capital plan. 
ii) note that project life performance will be monitored against a project life
estimate of £336.506m and a project life income estimate of £53.821m,
a borrowing requirement of £282.685m. 
iii) note that in year financial performance will be monitored against a
2026/27 capital expenditure budget of £58.434m and a 2026/27 capital
income budget of £13.064m, a one-year borrowing requirement of
£45.370m. 
iv) note that at this early stage all projects are on track regarding achieving
their planned completion dates and delivering within their project life
estimate. 
v) Note that there is an anticipated underspend of £2.340m against
2026/27 budgets reducing the forecast one-year borrowing requirement
to £43.030m.  
3. Background 
3.1 The Council approved the HRA Capital Plan for 2026/2027 to 2030/2031 on 4
March 2026. The approved plan estimated £63.285m of capital expenditure
and £16.901m of capital income in 2026/27, a one-year borrowing
requirement of £46.384m. The project life borrowing requirement was
£272.665m. 
3.2  Since March, budget adjustments have taken place to reflect up to date
information on progress delivering the plan, including the carry forward of over
/ underspends at the end of financial year 2025/26 and the incorporation of
the latest cost and income forecasts.  The adjustments result in revised capital
budgets as set out in Exhibit 1. The updated borrowing requirement for 26/27
of £45.370m is £2.340m less than advised in March 2026. The project life
ITEM 14
Page 107

Page 108

Official
borrowing requirement increased to £282.398m because 2025/2026
underspends were brought forward into the revised capital plan. 
Exhibit 1: Revised HRA Capital Estimates 2026/2027 – 2030/2031 
2026/27
March 26 
(£m)
Project 
March 26 
(£m) 
2026/27
BCR03 
(£m)
Project 
BCR03 
(£m) 
2026/27
Change
(£m)
Project 
Change 
(£m
Other Capital   5.510 26.060  5.700 27.730 0.190 1.670
Component Replacement   14.600 73.000  14.600 80.083 0.000 7.083
Void Capital  5.400 27.000  5.400 26.514 0.000 -0.486
Structural & Environmental   3.400 18.600  4.521 21.890 1.121 3.290
Support Costs  3.400 17.000  3.400 17.000 0.000 0.000
More Homes    30.975 163.866  24.813 163.289 -6.162 -0.577
Total Expenditure  63.285 325.526  58.434 336.506 -4.851 10.980
Total Income   -16.901 -52.861  -13.064 -53.821 3.837 --0.960
Prudential Borrowing  46.384 272.665  45.370 282.685 -1.014 10.020 
4. Main Issues 
4.1 Progress against the 2026/27 capital plan is detailed in: 
Appendix 1 – HRA Capital Summary BCR03 
Appendix 2 – HRA Capital Detail BCR03 
4.2  The HRA capital summary report at Appendix 1 reports that: 
• There are fifteen capital projects where expenditure is tracked over the
multi-year life of the project and twenty-eight projects classified as rolling
programme projects / contingency / fees, that is programmes of work
where an annual estimate is set each year that takes account of demand,
cost, and affordability.
• At this early stage in the year, projected expenditure and projected income
are both in line with project life estimate. 
4.3  Appendix 2 shows all projects with their 2026/27 budget and their project life
estimate alongside the latest projections. The appendix reports: 
• 2026/27 projected spend of £55.894m, a £2.540m underspend against the
2026/27 expenditure budget.
• 2026/27 projected income of £13.151m, a £0.200m under-recovery
against the 2026/27 income budget.
• 2026/27 prudential borrowing forecast of £43.030m, £2.340m less than
budget. 
4.4 Commentary on the 2026/27 variances above £50,000 are set out in Exhibit 2
below. 
Page 108

Page 109

Official
Exhibit 2: Projected Over / Underspends 2026/27 as at BCR03 
Ref Project BCR03
Projection 
(£m) 
26/27
Budget
(£m) 
26/27
Variance
(£m)  Commentary
1 EESSH compliance
works
Expenditure
3.500 5.000 (1.500) Underspend reflects the
changing mix of the capital
programme with an increased
number of mixed tenure
blocks that require owner
consent before work can start.
This necessary process
delays project start. 
The underspend has been
reprofiled to a future year. 
2 Roofs
Expenditure
0.900 1.500 (0.600) Underspend reflects the
changing mix of the capital
programme with an increased
number of mixed tenure
blocks that require owner
consent before work can start.
This necessary process
delays project start. 
The underspend has been
reprofiled to a future year.  
3 Heating Works 
Expenditure 
1.600 2.400 (0.800) Underspend reflects a
reduced demand for
replacement heating systems. 
The underspend has been
reprofiled to a future year
pending a review of demand
across this programme. 
4 Void Capital 
Expenditure 
5.760 5.400 0.360 Overspend due to the high
number of void property
repairs being carried out by
the in-house team and
supporting contractors. 
The overspend has been
reprofiled to a future year 
5 Owner Recoveries
Income 
-0.300 -0.500 0.200 Under-recovery of income is
directly linked to the projected
underspend on the roofing
programme. 
The under-recovery has been
reprofiled to a future year 
4.5 Budget assumptions are required to forecast costs / income, especially where
projects span multi-year and project finances have yet to be finalised. It is
therefore likely that the projections will change during the year.
Page 109

Page 110

Official 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected in-year financial position for the HRA capital
plan. 
8. Risk Analysis 
8.1 The main risks are as follows: 
(a) The reported variances should be viewed in the knowledge that there
are several variable factors which could arise between now and 31
March which could affect the year end results for capital budgets. 
(b) To forecast for the full year costs budget assumptions have been
required. These assumptions continue to change regularly and therefore
it is likely the projected year end position will change from that reported. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
11. Consultation 
11.1 All services involved in delivering the capital estimates have been consulted
during the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
________________
Laurence Slavin
Chief Officer – Resources
Date: 12 August 2026 
Page 110

Page 111

Official
Person to Contact: Jim McCarron 
Business Partner, Finance 07772 322055  
E-mail: james.mccarron@west-dunbarton.gov.uk 
Appendices: Appendix 1 -  HRA Capital Summary BCR03 
Appendix 2-  HRA Capital Details BCR03 
Background Papers: 
Housing Revenue Account (HRA) Capital Investment Programme, Revenue
Budget, and Rent Levels for 2026/27 - Council 4 March 2026. 
Wards Affected           All Wards 
Page 111

Page 112

Period 03 - 30 June 2026
Summary
HRA Capital Expenditure Project Life
Budget
£000
Project Life
Forecast Spend
£000
Project Life
Variance
£000
Rolling
Programmes
Projects Projects
On Track / Complete
Projects
Off Track
Other Capital Expenditure 27,730                    27,730                     -                           8                    -                                -                                -                               
Major Component Replacement 80,083                    80,083                     -                           7                    -                                -                                -                               
Void Capital 26,514                    26,514                     -                           1                    -                                -                                -                               
Structural & Environmental 21,890                    21,890                     -                           5                    -                                -                                -                               
Support Costs 17,000                    17,000                     -                           2                    -                                -                                -                               
More Homes Programme 163,289                  163,289                   -                           5                    15                                 15                                 -                               
Total Expenditure 336,506                  336,506                   -                           28                  15                                 15                                 -                               
Total Income (53,821) (53,821) -                           -                                -                               
Total 282,685 282,685 -                          
ITEM 14 - APPENDIX 1
Page 112

Page 113

All Approved HRA Capital Projects at Period 3
Project Category Planned
End Date
Project Life Budget Expenditure
to 31/3/26
Expenditure
to Date
Projected
Future Spend
Project Life Forecast
Spend
Project
Variance
Approved
Budget
2026/27
Expenditure
to Date
2026/27
Projected
Spend
2026/27
In Year
Variance
2026/27
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
OCE1 Special Needs Adaptations Rolling NA 3,225                            -                                    124                               3,101                            3,225                            -                                    650                               124                               650                               -                                    
OCE2 Capitalised Minor Works Rolling NA 15,942                         -                                    630                               15,312                         15,942                         -                                    3,100                            630                               3,100                            -                                    
OCE3 Better Homes Priority Budget Rolling NA 1,242                            -                                    6                                   1,236                            1,242                            -                                    200                               6                                    200                               -                                    
OCE4 Environmental Sensors Rolling NA 6,809                            -                                    391                               6,418                            6,809                            -                                    1,500                            391                               1,500                            -                                    
OCE5 Housing CCTV Rolling NA 100                               -                                    35                                 65                                 100                               -                                    100                               35                                  100                               -                                    
OCE6 QL Development Rolling NA 87                                 -                                    -                                    87                                 87                                 -                                    10                                  -                                     10                                  -                                    
OCE7 Gypsy Travellers Site Rolling NA 135                               -                                    -                                    135                               135                               -                                    -                                     -                                     -                                     -                                    
OCE8 Airport Noise Rolling NA 190                               -                                    -                                    190                               190                               -                                    140                               -                                     140                               -                                    
Other Capital Expenditure 27,730                         -                                1,186 26,544                         27,730                         -                                    5,700                            1,186                            5,700                            -                                    
MCR1 EESSH compliance works Rolling NA 27,916                         -                                    298                               27,618                         27,916                         -                                    5,000                            298                               3,500                            (1,500)
MCR2 Roofs Rolling NA 8,863                            -                                    4                                   8,859                            8,863                            -                                    1,500                            4                                    900                               (600)
MCR3 Windows / Doors Rolling NA 16,270                         -                                    579                               15,691                         16,270                         -                                    3,100                            579                               3,100                            -                                    
MCR4 Statutory / Regulatory Compliance Works Rolling NA 999                               -                                    -                                    999                               999                               -                                    100                               -                                     100                               -                                    
MCR5 Heating Rolling NA 12,622                         -                                    233                               12,389                         12,622                         -                                    2,400                            233                               1,600                            (800)
MCR6 Kitchens Rolling NA 10,828                         -                                    72                                 10,756                         10,828                         -                                    2,000                            72                                  2,000                            -                                    
MCR7 Bathrooms & Showers Rolling NA 2,585                            -                                    13                                 2,572                            2,585                            -                                    500                               13                                  500                               -                                    
Major Component Replacement 80,083                         -                                1,199 78,884                         80,083                         -                                    14,600                          1,199 11,700 (2,900)
VOC1 Void Capital Rolling NA 26,514                         -                                    -                                    26,514                                                   26,514                                   -   5,400                            -                                     5,760                            360                              
Void Capital 26,514                         -                                -                                26,514                         26,514                         -                                    5,400                            -                                     5,760                            360                              
STE1 Structural Works Rolling NA 2,330                                                                - -                                    2,330                            2,330                            -                                    -                                -                                     -                                -                                    
STE2 Paths & Environment Rolling NA 5,922                                                                - 220                               5,702                            5,922                            -                                    1,200                            220 1,200                            -                                    
STE3 Asbestos Management Works Rolling NA 955                                                                   - 22                                 933                               955                               -                                    200                               22                                  200                               -                                    
STE4 Multi Storey Flat Strategy Rolling NA 11,562                                                             - 5                                   11,557                         11,562                         -                                    2,000                            5                                    2,000                            -                                    
STE5 Cladding Remediation Works Rolling NA 1,121                            -                                    -                                    1,121                            1,121                            -                                    1,121                            -                                     1,121                            -                                    
Structural & Environmental 21,890                         -                                247                               21,643                         21,890                         -                                    4,521                            247 4,521                            -                                    
SUP1 Salaries / Central Support / Overhead Rolling NA 17,000                         -                                    850                               16,150                                                   17,000                                     - 3,400                            850                               3,400                            -                                    
SUP2 Vehicle Replacement Programme Rolling NA -                                -                                    -                                    -                                    -                                    -                                -                                     -                               
Support Costs 17,000                         -                                850                               16,150                         17,000                         -                                    3,400                            850                               3,400                            -                                    
AHP1 Buy Backs Rolling NA 20,000                         -                                    1,097                            18,903                                                   20,000                                     - 4,000                            1,097                            4,000                            -                                    
AHP2 Demolition Programme Rolling NA 1,000                            -                                    5                                   995                                                           1,000                                     - 200                               5                                    200                               -                                    
AHP3 Contingency Rolling NA -                                -                                    -                                    -                                                                  -                                       - -                                     -                                     -                                     -                                    
AHP4 Clydebank East Project September 25 33,554                         33,554                         33,554                         -                                                          33,554                                     - -                                     -                                     -                                     -                                    
AHP5 Pappert Project September 25 9,181                            9,181                            9,181                            -                                                            9,181                                     - -                                     -                                     -                                     -                                    
AHP6 Mount Pleasant Project September 25 5,364                            5,364                            5,364                            -                                                            5,364                                     - -                                     -                                     -                                     -                                    
AHP7 Willox Park Phase1 Project March 26 5,601                            5,416                            5,416                            185                                                           5,601                                     - 85                                  -                                     85                                  -                                    
AHP8 Willox Park Phase2 Project March 28 7,030                            108                               122                               6,908                                                        7,030                                     - 500                               14                                  500                               -                                    
AHP9 Bank Street Project March 27 6,347                            1,953                            3,160                            3,187                                                        6,347                                     - 4,244                            1,207                            4,244                            -                                    
AHP10 Bonhill Gap Sites Project September 27 9,086                            5,353                            6,725                            2,361                                                        9,086                                     - 3,400                            1,372                            3,400                            -                                    
AHP11 West Thomson Street Project September 28 15,827                         1,479                            1,494                            14,333                                                   15,827                                     - 2,000                            15                                  2,000                            -                                    
AHP12 Silverton Project September 27 2,379                            35                                 40                                 2,339                                                        2,379                                     - 1,100                            5                                    1,100                            -                                    
AHP13 Queen Mary Avenue Project September 26 4,540                            2,469                            3,203                            1,337                                                        4,540                                     - 1,971                            734                               1,971                            -                                    
AHP14 Queens Quay Site C Project March 30 5,531                            31                                 31                                 5,500                                                        5,531                                     - -                                     -                                     -                                     -                                    
AHP15 Dennystoun Forge – New Build Project March 28 4,589                            59                                 59                                 4,530                                                        4,589                                     - 1,000                            -                                     1,000                            -                                    
AHP16 28 Bridge Street Project September 27 1,010                            60                                 60                                 950                                                           1,010                                     - 950                               -                                     950                               -                                    
AHP17 Ottawa Crescent Project September 27 6,350                            413                               894                               5,456                                                        6,350                                     - 5,150                            481                               5,150                            -                                    
AHP18 Gray Street Project September 28 7,717                            4                                   17                                 7,700                                                        7,717                                     - 13                                  13                                  13                                  -                                    
AHP19 Future New Build & Related Regeneration Projects Rolling NA 17,183                         -                                    17,183                                                   17,183                                     - -                                     -                                     -                                     -                                    
AHP20 Fees, Staffing Costs, contingency Rolling NA 1,000                            -                                    30                                 970                                                           1,000                                     - 200                               30                                  200                               -                                    
More Homes Programme 163,289                       65,479                         70,452                         92,837                         163,289                                                           - 24,813                          4,973                            24,813                          -                                    
Total Expenditure 336,506                       65,479                         73,934                         262,572                       336,506                                                           - 58,434                          8,455 55,894 (2,540)
Full Project Life In Year Performance
ITEM 14 - APPENDIX 2
Page 113

Page 114

All Approved HRA Capital Projects at Period 3 Appendix 2
Project Category Planned
End Date
Project Life Budget Income
to 31/3/26
Income
to Date
Projected
Future Income
Project Life Forecast
Income
Project
Variance
Approved
Budget
2026/27
Expenditure
to Date
2026/27
Projected
Spend
2026/27
In Year
Variance
2026/27
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
CAPI1 Scottish Govt Buyback Grant Rolling NA (12,000) -                                    (52) (11,948) (12,000) -                                    (2,400) (52) (2,400) -                                    
CAPI2 Willox Park Phase2 Project NA (2,850) (127) (127) (2,723) (2,850) -                                    (500) -                                     (500) -                                    
CAPI3 Bank Street Project NA (2,408) (1,307) (1,307) (1,101) (2,408) -                                    (1,101) -                                     (1,101) -                                    
CAPI4 Bonhill Gap Sites Project NA (4,518) (3,738) (3,738) (780) (4,518) -                                    (780) -                                     (780) -                                    
CAPI5 West Thomson Street Project NA (5,416) (1,485) (1,485) (3,931) (5,416) -                                    (2,000) -                                     (2,000) -                                    
CAPI6 Silverton Project NA (1,100) -                                    -                                    (1,100) (1,100) -                                    (1,000) -                                     (1,000) -                                    
CAPI7 Queen Mary Avenue Project NA (1,789) (1,789) (1,789) -                                    (1,789) -                                    -                                     -                                     -                                     -                                    
CAPI8 Queens Quay Site C Project NA (4,714) (2,014) (2,014) (2,700) (4,714) -                                    -                                     -                                     -                                     -                                    
CAPI9 Dennystoun Forge – New Build Project NA (2,400) -                                    -                                    (2,400) (2,400) -                                    (1,000) -                                     (1,000) -                                    
CAPI10 28 Bridge Street Project NA -                                    -                                    -                                    -                                    -                                    -                                    -                                     -                                     -                                     -                                    
CAPI11 Ottawa Crescent Project NA (2,800) (379) (379) (2,421) (2,800) -                                    (2,421) -                                     (2,421) -                                    
CAPI12 Gray Street Project NA (3,087) -                                    -                                    (3,087) (3,087) -                                    -                                     -                                     -                                     -                                    
CAPI13 Future new build sites & related regeneration projects Rolling NA (6,873) -                                    -                                    (6,873) (6,873) -                                    -                                     -                                     -                                     -                                    
CAPI14 Owners Recoveries Rolling NA (2,500) -                                    (78) (2,422) (2,500) -                                    (500) (78) (300) 200                              
CAPI15 Other Grant Rolling NA (1,361) -                                    -                                    (1,361) (1,361) -                                    (1,361) -                                     (1,361) -                                    
CAPI16 HRA Loan Repayments Rolling NA (5) -                                    -                                    (5) (5) -                                    (1) -                                     (1) -                                    
Total Income (53,821) (10,839) (10,969) (42,852) (53,821) -                                    (13,064) (130) (12,864) 200
Prudential Borrowing Requirement 282,685                       54,640                         62,965                         219,720                       282,685                       -                                    45,370                          8,325 43,030 (2,340)
Full Project Life In Year Performance
Page 114

Page 115

Official
WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Resources   
Housing and Communities Committee: 12 August 2026
___________________________________________________________________ 
Subject:  General Fund Housing and Communities Financial Report 2026/27
as at Period 3 (30 June 2026) 
1. Purpose 
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 30 June 2026 (Period 3) of General Fund Revenue
services under the remit of the Housing and Communities Committee. 
2. Recommendations 
2.1 Members are asked to 
i) note the account currently shows a projected favourable variance of
£0.117m (9.1% of the net expenditure budget). 
ii) note the progress on efficiencies incorporated into 2026/2027 budgets. 
3. Background 
3.1      Revenue Budget
Members agreed the 2026/2027 revenue estimates at the Council meeting on
4th March 2026.   
A total net expenditure budget of £1.287m was approved for services under
the Housing and Communities services remit. 
Budget Approved 4 March 2026 Gross
Expenditure
£m
Gross
Income
£m 
Net
Expenditure
£m 
Homelessness Services 5.314 -4.389 0.925
Resettlement Services  0.440 -0.440 -
Private Sector Housing 0.016 - 0.016
Private Sector Housing Grant 0.430 -0.382 0.048
Energy Efficiency Area Based Scheme 1.570 -1.570 -
Anti-Social Behaviour & CCTV 0.519 -0.221 0.298
Total   8.289 -7.002 1.287 
ITEM 15
Page 115

Page 116

Official 
4. Main Issues 
4.1 Appendix 1 reports the forecast outturn for the services at £1.329m, a
projected favourable variance of £0.117m. 
Exhibit 1 - Forecast BCR03 compared to Budget 26/27 
Service Area 
Forecast
Outturn
BCR03
£m
Budgeted 
Net 
Expenditure
£m
Variance
£m
Homelessness Service 0.630 0.925 -0.295
Resettlement Service  0.201 - 0.201
Private Sector Housing 0.016 0.016 -
Private Sector Housing Grant 0.047 0.048 -0.001
Energy Efficiency Area Based Scheme                     -  - -
Anti-Social Behaviour & CCTV 0.276 0.298 -0.022
Total   1.170 1.287 -0.117 
4.2 The Homelessness Service underspend is due to vacant posts. The service is
actively recruiting to vacant posts to ensure the effective delivery of services
and support to its clients. 
4.3 The Resettlement Service is forecasting a £201,000 overspend. The council
receives Scottish and UK government grant funding to support Ukrainian
refugees and other refugees resetting within the UK. The grant funding is
based on the number of individuals settling within a local authority area, with
the grant income provided over multiple years. The early forecast is for
2026/27 service expenditure to exceed grant funding. It is difficult to forecast
grant income because of the uncertainty over the number of individuals who
will settle within the area each year. 
Appendix 2 provides a detailed analysis by service area. 
Appendix 3 provides commentary of projected net annual variances greater
than £0.050m. 
Appendix 4 shows progress on the delivering 2026/2027 saving options.   
5. People Implications 
5.1 There are no people implications. 
6. Financial Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. 
Page 116

Page 117

Official
6.2      Agreed efficiencies for 2026/2027 are monitored with current indications being
that the  savings of £0.049m will be achieved (see Appendix 4).   
7. Risk Analysis 
7.1 The present variances should be viewed in the knowledge that there are
several variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets.  
8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 All services involved in delivering the budgets have been consulted in the
compilation of this report 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities. 
Laurence Slavin
Chief Officer, Resources                       
Date: 12 August 2026
___________________________________________________________________ 
Person to Contact:  Jim McCarron  - Finance Business Partner, 
16 Church Street, Dumbarton, G82 1QL  
Telephone: 07772 322055  
e-mail james.mccarron@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Summary Budgetary Position (Revenue)    
Appendix 2 - Detailed Budgetary Position (Revenue)    
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Efficiencies/Savings Options
(Revenue)     
Background Papers: None 
Wards Affected:  All 
Page 117

Page 118

WEST DUNBARTONSHIRE COUNCIL Appendix 1
REVENUE BUDGETARY CONTROL 2026/27
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 30 June 2026
Actual
Outturn
2025/26
Total Budget
2026/27 Spend to Date Projected
Spend
Net Variance
attributable to
earmarked
reserves
spend
Underlying
Variance
excluding
earmarked
reserves
spend
Annual
RAG
Status
£000 £000 £000 £000 £000 % £000 £000
734 925 37 630 (295) -32% -                      (295) 
(964) Resettlement Services -                     105 201 201 0% -                      201                
17 16 4 16 0 0% -                      -                    
45 Private Sector Housing Grant 48 13 47 (1) -2% -                      (1) 
-                 Energy Efficiency Area Based Scheme -                     -                      -                      -                       0% -                      -                    
234 298 71 276 (22) -7% -                      (22) 
66 1,287 230 1,170 (117) -9% -                      (117) Total Net Expenditure
Service / Subjective Summary
Annual
Variance
2026/27
Homelessness Services
Private Sector Housing
Anti Social Behaviour & CCTV
ITEM 15 - APPENDIX 1
Page 118

Page 119

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2026/27
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 30 June 2026
PERIOD 3
Actual
Outturn
2025/26
Service Summary
Total
Budget
2026/27
YTD
Spend
2026/27
Forecast
Spend
2026/27
Use of
Earmarked
Reserves
Variance after
the use of
Earmarked
Reserves
RAG Status
£000 £000 £000 £000 £000 % £000 £000
2,491               Employee 3,148         591            2,883           (265) -8% -                     (265) 
2,802               Property 2,785         644            3,000           215 8% -                     215                     
16                    Transport and Plant 14              3                14                0 0% -                     -                          
83                    Supplies, Services and Admin 96              12              95                (1) -1% -                     1-                         
1,528               Payments to Other Bodies 2,246         451            2,290           44 2% -                     44                       
-                       Other -                 -                 -                  0 0% -                     -                          
6,920               Gross Expenditure 8,289         1,701         8,282           (7) 0% -                     (7) 
(6,854) Income (7,002) (1,471) (7,112) (110) 2% -                     (110) 
66                    Net Expenditure 1,287 230            1,170           (117) -9% -                     (117) 
£000 £000 £000 £000 £000 % £000 £000
1,740               Employee 2,160 416            1,830           (330) -15% -                     (330) 
2,332               Property 2,465 532            2,478           13 1% -                     13 
13                    Transport and Plant 13 3                13                0 0% -                     0 
58                    Supplies, Services and Admin 70 12              69                (1) -1% -                     (1) 
879                  Payments to Other Bodies 606 235            652              46 8% -                     46 
-                       Other -                 -                 -                  -         0% -                     -                          
5,022               Gross Expenditure 5,314         1,198         5,042           (272) -5% -                     (272) 
(4,288) Income (4,389) (1,161) (4,412) (23) -1% -                     (23) 
734                  Net Expenditure 925            37              630              (295) -32% -                     (295) 
£000 Resettlement Services £000 £000 £000 £000 % £000 £000
331                  Employee 340            77              428              88 26% -                     88 
158                  Property 2                41              204              202 10100% -                     202 
3                      Transport and Plant 1                -                 1                  0 0% -                     0 
27                    Supplies, Services and Admin 27              1                27                0 0% -                     0 
55                    Payments to Other Bodies 70              20              68                (2) -3% -                     (2) 
-                       Other -                 -                 -                  -         0% -                     -                          
574                  Gross Expenditure 440            139            728              288 65% -                     288 
(1,538) Income (440) (34) (527) (87) -20% -                     (87) 
(964) Net Expenditure -                 105            201              201 0% -                     201 
£000 £000 £000 £000 £000 % £000 £000
13                    Employee 16              4                16                -         0% -                     0 
-                       Property -                 -                 -                  -         0% -                     0 
-                       Transport and Plant -                 -                 -                  -         0% -                     0 
-                       Supplies, Services and Admin -                 -                 -                  -         0% -                     0 
4                      Payments to Other Bodies -                 -                 -                  -         0% -                     0 
-                       Other -                 -                 -                  -         0% -                     -                          
17                    Gross Expenditure 16              4                16                -         0% -                     0 
-                       Income -                 -                 -                  -         0% -                     0 
17 Net Expenditure 16              4                16                -         0% -                     0 
£000 £000 £000 £000 £000 % £000 £000
44                    Employee 49              13              50                1 2% -                     1 
223                  Property 177            35              175              (2) -1% -                     (2) 
-                       Transport and Plant -                 -                 -                  -         0% -                     -                          
(3) Supplies, Services and Admin (2) (1) (2) -         0% -                     -                          
207                  Payments to Other Bodies 206            52              206              -         0% -                     -                          
-                       Other -                 -                 -                  -         0% -                     -                          
471                  Gross Expenditure 430            99              429              (1) 0% -                     1-                         
(426) Income (382) (86) (382) -         0% -                     -                          
45 Net Expenditure 48              13              47                (1) -2% -                     1-                         
Annual
Variance
2026/27
Homelessness Services
All Services
Private Sector Housing
Private Sector Housing Grant
ITEM 15 - APPENDIX 2
Page 119

Page 120

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2026/27
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 30 June 2026
PERIOD 3
Actual
Outturn
2025/26
Service Summary
Total
Budget
2026/27
YTD
Spend
2026/27
Forecast
Spend
2026/27
Use of
Earmarked
Reserves
Variance after
the use of
Earmarked
Reserves
RAG Status
Annual
Variance
2026/27
£000 £000 £000 £000 £000 % £000 £000
-                       Employee 236            -                 236              -         0% -                     -                          
-                       Property -                 -                 -                  -         0% -                     -                          
-                       Transport and Plant -                 -                 -                  -         0% -                     -                          
-                       Supplies, Services and Admin -                 -                 -                  -         0% -                     -                          
383                  Payments to Other Bodies 1,334         136            1,334           -         0% -                     -                          
-                       Other -                 -                 -                  -         0% -                     -                          
383                  Gross Expenditure 1,570         136            1,570           -         0% -                     -                          
(383) Income (1,570) (136) (1,570) -         0% -                     -                          
0 Net Expenditure -                 -                 -                  -         0% -                     -                          
£000 £000 £000 £000 £000 % £000 £000
363                  Employee 347 81 323 (24) -7% -                     (24) 
89                    Property 141 36 143 2        1% -                     2 
-                       Transport and Plant -                 -                 -                  -         0% -                     -                          
1                      Supplies, Services and Admin 1 -                 1 -         0% -                     -                          
-                       Payments to Other Bodies 30              8                30                -         0% -                     -                          
-                       Other -                 -                 -                  -         0% -                     -                          
453                  Gross Expenditure 519            125            497              (22) -4% -                     (22) 
(219) Income (221) (54) (221) -         0% -                     -                          
234 Net Expenditure 298            71              276              (22) -7% -                     (22) 
………………………………………………………………………………………………………………………………………………………………………………………….
Anti Social Behaviour & CCTV
Energy Efficiency Area Based Scheme
Page 120

Page 121

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Homelessness Services 925 630 (295) -32% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Resettlement Services 0 201 201 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The service supports refugees to settle and integrate within local communities.
Grant funding is dependent on the number of individuals settling within the area. The early
forecast is for service expenditure to exceed grant funding by £200,000.
Maximise grant income through successful claims to UK and Scottish governments.
Year end overspend.
Year end underspend.
Vacant posts across the service will deliver an employee cost underspend.
None
30 June 2026
Budget Details
Variance Analysis
Variance
The service seeks to prevent homelessness occurring across the authority and improves
access to support services.
ITEM 14 - APPENDIX 3
Page 121

Page 122

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2026/27 - BCR03
Efficiency Detail Reference Budgeted
Amount
£'000
Projection of
Total Saved
£'000
Projection of
Total Not Saved
£'000
Comment
CCTV Service Reduction Option 2 HE04 31                   31 0
Reduce CCTV Team 25% Option 1 HE02 14                   14 0
45 45 0
STATUS: COMPLETE
ITEM 14 - APPENDIX 4
Page 122