WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 25 February 2026
Subject: Lock Up and Garage Site Review Update
1. Purpose
1.1     The purpose of this report is to update members on the ongoing review of Lock
Ups and Garage sites managed within the Housing Revenue Account.  The
paper seeks approval for the introduction of a refreshed lock up policy and
revised guidance for the operation of garage sites.  In addition, the paper
outlines the condition and future approach for the 14 garage site plots located
at Portpatrick Road, Old Kilpatrick.
2. Recommendations
2.1.1 It is recommended that the Housing and Communities Committee:
(i) Approve the refreshed Lock Up Policy attached as appendix 1 to this
report:
(ii) Note the revised Garage site procedure attached as appendix 2 to this
report: and
(iii) Note the actions being taken in relation to the Portpatrick Road garage
sites which will see
a. notices to quit be issued to all garage plot tenants, effective from 1
April 2026;
b. all tenants will be requested to remove their garage structures by the
termination date; and
c. any structures not removed will be demolished by the Council, with
all associated costs recharged to the relevant tenant.
3. Background
3.1 The Council owns and manages 21 garage sites comprising 155 plots, of
which 41 are currently vacant. The Council does not own the structures
situated on these sites, but leases plots where the leaseholder is then
responsible for constructing and maintaining their removable garage structure.
3.2 In addition to the garage sites, the Council also manages lock up, which are a
permanent structure leased to residents to store a car. There are currently forty-
five sites throughout the local area, including twenty-three in Alexandria, five in
ITEM 11

Page 2

Dumbarton, two in Old Kilpatrick and fifteen in Clydebank. In total there are 608
lock ups managed by the Council’s housing service.
3.3 A on-going review of the lock ups and garage sites is currently being undertaken
to maximise their value to both the housing revenue account and the wider
communities of West Dunbartonshire, and this report highlights the first outputs
of this review.
4. Main Issues
4.1 The management and maintenance of lock up and garage sites has been
identified as an improvement action in a number of housing service plans.  A
review is currently being undertaken through the Council’s Better Homes
Project Board and are looking at a number of initiatives which would see these
Housing Revenue Account (HRA) assets be improved for the betterment of
Council tenants.  Some of these initiatives include the following: -
 A review of the current charging levels.
 Stock condition survey of all lock ups.
 An options appraisal of each garage site for future use.
4.2 While, the above initiatives are being progressed, one of the early findings of
the review identified was the need to strengthen the management of both the
lock up and garage site operational delivery.  To assist with this an officer
within the housing service has assumed responsibility for the management of
both and while this will strengthen operational management, allocation and
maintenance, the need for written procedures to support staff and tenants was
also identified as a priority action.  As a result, a new garage site policy has
been introduced and was approved following consultation at the Better Homes
Project Board in January 2026.  In addition, a new lock up policy has been
developed and is presented as Appendix 1 of this report.
4.3 The lock up policy outlines the terms and conditions for the rental and use of
Lock Ups (storage garages) provided by West Dunbartonshire Council. It
ensures fair access, safe usage, and proper management of these facilities
across all forty-five lock up locations in West Dunbartonshire.
Portpatrick Road Garage Sites
4.4 As part of the ongoing review, an initial assessment was made at the garage
site located at Portpatirck Road, Old Kilpatrick.  It was identified that many
garages are in poor condition and attracting anti-social behaviours such as fly-
tipping.
4.5 Further investigation identified a significant number of the garage structures to
be in poor structural condition with some requiring extensive repairs. This
deterioration has negatively affected the visual amenity of the area and has
raised safety concerns for the wider community.
4.6 In addition, a number of the garage plots have tenants with outstanding arrears.
This presents a clear financial risk to the Housing Revenue Account and
highlights challenges in enforcing payment compliance under the current lease
arrangements.

Page 3

4.7 Investigations have confirmed that none of the garages are being used for
their intended purpose of storing private motor vehicles. This constitutes a
breach of the lease agreement and suggests that the site is being used for
alternative, unauthorised purposes.
4.8 The site has increasingly become a location for fly-tipping and other forms of
misuse, adversely affecting the local environment and contributing to
concerns regarding anti-social behaviour. These ongoing issues have resulted
in numerous complaints from the Community Council and local residents.
Summary Review of the individual garage plots:
Garage number Condition of Garage Condition of Let
GS1 Good condition Unlet
GS2 Good condition Unlet
GS3 Poor condition Let
GS4 Poor condition Unlet
GS5 Plot is Void Unlet
GS6 Plot is Void Unlet
GS7 Poor condition Let
GS8 Poor condition Let
GS9 Plot is Void Unlet
GS10 Poor condition Let
GS11 Plot is Void Unlet
GS12 Poor condition Let
GS13 Poor condition Let
GS14 Poor condition Let
4.9 It is proposed to issue notices to quit which will require all current tenants to
vacate their plots and remove any garage structures by the termination date.

Page 4

This may cause inconvenience and potential financial burden for tenants who
have invested in their structures. To mitigate this, clear communication and
reasonable notice periods will be provided.
4.10 The removal of deteriorated garages and the elimination of fly-tipping will
significantly improve the visual amenity and safety of the area. This action will
reduce environmental hazards and anti-social behaviour, creating a cleaner
and more secure space for local residents
4.11 The site has been identified as a strategic location for sustainable transport
initiatives. It has been approved for the installation of electric vehicle (EV)
charging infrastructure and parking adaptations to support modern mobility
needs. To progress these plans, the Council’s procurement team is actively
reviewing suitable frameworks and contractual options that will enable timely
and cost-effective delivery of the project. This approach aligns with the
Council’s commitment to reducing carbon emissions and promoting greener
transport solutions. More detailed information on this will be brought to a future
Committee meeting.
5. People Implications
5.1 The delivery of the review is managed through existing resource within the
Housing Development & Homelessness team.
6. Financial and Procurement Implications
Financial
6.1 The removal of existing garage structures and clearance of the site will incur
costs related to demolition, waste disposal, and potential enforcement actions
for non-compliance. Where tenants fail to remove their structures by the agreed
termination date, all associated costs will be recharged to the relevant tenant in
line with Council policy. However, in cases where a garage does not have an
identifiable owner, the Council will assume responsibility for demolition and
associated costs. These costs will be considered within the Council’s Housing
Capital Investment Plan.
6.2 If the redevelopment of the site moves forward with the installation of the EV
charging infrastructure, then no Council investment will be required. The
appointed EV charging company will cover all costs associated with converting
the site for parking and installing EV charging infrastructure. In addition, the
Council will benefit from a new revenue stream through an annual land usage
fee paid by the EV charging provider for each charging bay, ensuring a
sustainable financial return without upfront capital expenditure. As above, more
information on this will be brought to a future Committee meeting.
Procurement
6.2 To progress the redevelopment, the Council’s procurement team is actively
reviewing suitable frameworks and contractual options to ensure timely and

Page 5

cost-effective delivery. This will include consideration of existing national and
local frameworks for EV infrastructure, ensuring compliance with procurement
regulations and best value principles. Collaboration between Housing,
Procurement, and Sustainability teams will be essential to manage supplier
engagement and project implementation.
7. Risk Analysis
7.1 There is a risk that some tenants may fail to remove their garage structures by
the termination date, resulting in additional costs and delays. This will be
mitigated through clear communication, reasonable notice periods, and
enforcement measures where necessary.
7.2 The decision to terminate leases and clear the site may generate negative
feedback from tenants. This risk will be managed through proactive
engagement and transparent communication.
7.3 The removal of the garage structures may generate waste and potential
environmental hazards. Appropriate waste management and compliance with
environmental regulations will be enforced to minimise impact.
8 Environmental Sustainability
8.1 The proposed actions will deliver significant environmental benefits. The
removal of the garage structures and the elimination of fly-tipping will reduce
environmental impacts and improve the overall visual amenity of the area.
8.2 If the redevelopment of the site for electric vehicle charging infrastructure and
improved parking facilities goes ahead, this will support the Council’s
commitment to reducing carbon emissions and promoting sustainable transport
solutions.
9. Equalities Impact Assessment (EIA)
9.1 The proposal does not alter any existing policy or pattern of service delivery at
this time and so is not considered to require an equalities impact assessment.
10. Consultation
10.1 Consultation has taken place with key internal stakeholders, including the
Housing Development Team, Housing Operations, Procurement, and the Legal
Team, to ensure alignment with strategic objectives and compliance with
procurement regulations. Concerns raised by the Community Council regarding
the current condition of the site have been noted, and an update will be provided
as further progress is made. Further consultation will be carried out with
affected tenants to provide clear guidance on lease termination, removal
requirements, and timelines, ensuring transparency and minimising disruption.
11. Strategic Assessment

Page 6

11.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire.
11.2 Having considered all the Council’s strategic priorities, the recommendations
noted above were discusses and approved at the Better Homes Board.
Peter Barry
Chief Officer, Housing
Date: 30 January 2026
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing, telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk
Beats Csibi - Housing Development Officer, Housing
Development and Homelessness Team, Housing, , email:
beata.csibi@west-dunbarton.gov.uk
Appendices: 1 Lock Up policy
2 Garage Site Guidance 
Background Papers: None
Wards Affected: All/Ward 6 (Portpatrick Road)