Page 1

Agenda 
Housing and Communities
Committee 
Date:  Wednesday, 19 November 2025
___________________________________________________________________ 
Time:  10:00 
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:  Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk           
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Housing and Communities Committee as detailed
above. 
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton G82 1QL. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT
Chief Executive 
Page 1

Page 2

Distribution:- 
Councillor Kevin Crawford
Councillor Ian Dickson 
Councillor Gurpreet Singh Johal (Chair)
Councillor David McBride
Councillor Michelle McGinty
Provost Karen Murray Conaghan
Councillor Lawrence O’Neill
Councillor Lauren Oxley 
Councillor Martin Rooney
Councillor William Rooney
Councillor Hazel Sorrell (Vice Chair)
Councillor Sophie Traynor 
All other Councillors for information 
Chief Executive
Chief Officer – Housing 
Chief Officer – Resources 
Date issued:  6 November 2025 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site. 
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/ 
Page 2

Page 3

HOUSING AND COMMUNITIES COMMITTEE 
WEDNESDAY, 19 NOVEMBER 2025 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING  
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
4 RECORDING OF VOTES   
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record. 
5 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
6 MINUTES OF PREVIOUS MEETING     7 - 14 
Submit for approval, as a correct record, the Minutes of Meeting of the
Housing and Communities Committee held on 20 August 2025. 
7 SCRUTINY REPORTS 
(a)  POLICE SCRUTINY REPORT 
Submit report by the Divisional Commander, Police Scotland providing
Members with an update Quarter 4 on local policing in West Dunbartonshire.                                
15 - 25 
7 (b)/
Page 3

Page 4

(b)  FIRE AND RESCUE SCRUTINY REPORT             27 - 42
Submit report by the Local Senior Officer, Scottish Fire and Rescue Service
providing appropriate performance data measured against priorities in the
West Dunbartonshire Local Fire and Rescue Plan. 
8 HOUSING SERVICES DELIVERY PLAN 2025/26                        43 - 60
MID-YEAR PROGRESS REPORT 
Submit report by the Chief Housing Officer providing an update on progress of
the Housing Services Delivery Plan 2025/26. 
9 HOUSING EMERGENCY ACTION PLAN             61 - 86 
Submit report by the Chief Housing Officer providing an updating on the
Housing Emergency Action Plan (HEDAP) which was formulated to address
the emergency following the Council’s housing emergency declaration on 1st
May 2024. 
10 ‘MORE HOMES WEST DUNBARTONSHIRE’ - STRATEGIC 
HOUSING INVESTMENT PLAN (SHIP) 2025/26 - 2029/30   
87 - 119
Submit report by the Chief Housing Officer seeking approval for the More
Homes West Dunbartonshire Strategic Housing Investment Plan (SHIP) for
2025/26 - 2029/30 which requires to be submitted to the Scottish Government. 
11 MORE HOMES WEST DUNBARTONSHIRE – WEST            121 - 131
DUNBARTONSHIRE COUNCIL AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME   
Submit report by the Chief Housing Officer providing an update on progress
with West Dunbartonshire’s More Homes Programme which oversees the
delivery of the Council’s new home building programme. 
12  SCOTTISH SOCIAL HOUSING CHARTER ANNUAL  
BENCHMARKING AND MID-YEAR PROGRESS REPORT 
133 - 144 
Submit report by the Chief Housing Officer providing benchmarking
information relating to 2024/25 and a mid-year update in terms of how the
Council’s Housing and Homelessness service is performing against the
Scottish Social Housing Charter indicators and meeting the requirements of
the Scottish Housing Regulator’s Regulatory Framework. 
Page 4

Page 5

13  FORMER TENANTS RENT ARREARS WRITE-OFFS                  145 - 147 
Submit report by the Chief Housing Officer seeking approval for the write-off of
rent arrears for former tenants. 
14 BUILDING SERVICES PROCUREMENT (APPROVAL   149 - 151 
REQUIRED TO AWARD) 
Submit report by the Chief Housing Officer seeking approval of completed
tender processes for Building Services. 
15 BUILDING SERVICES PROCUREMENT (APPROVAL   153 - 157 
REQUIRED TO TENDER) 
Submit report by the Chief Housing Officer seeking approval of updated
tender requirements information for Building Services. 
16 HOUSING REVENUE ACCOUNT (HRA) REVENUE  
BUDGETARY CONTROL REPORT TO 31 AUGUST (PERIOD 5)   
159 - 168 
Submit report by the Chief Officer - Resources advising of the 2025/2026 HRA
revenue budget position on 31 August 2025 and the forecast position of the
HRA reserves as of 31 March 2026. 
17 HOUSING REVENUE ACCOUNT (HRA) CAPITAL   
BUDGETARY CONTROL REPORT TO 31 AUGUST 2025 
(PERIOD 5)     
169 - 179 
Submit report by the Chief Officer - Resources providing an update on the
HRA capital programme to 31 August 2025 (Period 5). 
18 GENERAL FUND HOUSING AND COMMUNITIES   
FINANCIAL REPORT 2025/26 AS AT PERIOD 5 
(31 AUGUST 2025) 
181 - 188 
Submit report by the Chief Officer - Resources providing an update on the 
financial performance to 31 August 2025 (Period 5) of General Fund 
Revenue services under the remit of the Housing and Communities 
Committee. 
Page 5

Page 6

Page 6

Page 7

HOUSING AND COMMUNITIES COMMITTEE 
At a Hybrid Meeting of the Housing and Communities Committee held in the Civic
Space, 16 Church Street, Dumbarton on Wednesday, 20 August 2025 at 10.00 a.m. 
Present: Provost Karen Murray Conaghan and Councillors Kevin
Crawford, Ian Dickson, Gurpreet Singh Johal, David McBride,
Michelle McGinty, Lawrence O’Neill, Lauren Oxley, Martin
Rooney, Hazel Sorrel and Sophie Traynor. 
Attending: Peter Barry, Chief Officer - Housing; John Kerr, Housing
Development and Homelessness Manager; Nicola Pettigrew,
Housing Operations Manager; Laurence Slavin, Chief Officer -
Resources; Alistair Norris, Contracts Manager; Iain Skene,
Procurement Manager; Christopher Anderson, Section Head
and Principal Solicitor and Nicola Moorcroft, Committee Officer. 
Also attending: Superintendent Mark Stirling and Superintendent Colin
Cameron, Police Scotland; Group Commander Kevin Rennie
and Watch Commander Chris Spence, Argyll and Bute, East
and West Dunbartonshire, Scottish Fire and Rescue Service. 
Apologies: Apologies for absence were intimated on behalf of Councillor
William Rooney. 
Apologies for absence from Divisional Commander Gary
I’Anson, and Chief Inspector Simon Shanks were also noted. 
Councillor Gurpreet Singh Johal in the Chair 
STATEMENT BY CHAIR – AUDIO STREAMING 
Councillor Gurpreet Singh Johal, Chair, advised that the meeting was being audio
streamed and broadcast live to the internet and would be available for playback. 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
ITEM 6
Page 7

Page 8

RECORDING OF VOTES 
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of the Meeting of the Housing and Communities Committee held on 7
May 2025 were submitted and approved as a correct record. 
SCRUTINY REPORTS 
(a) POLICE SCRUTINY REPORT 
A report was submitted by the Divisional Commander, Police Scotland
providing Members with an update Quarter 1 for 2025/26 on local policing in
West Dunbartonshire. 
After discussion and having heard, Superintendent Mark Stirling and
Superintendent Colin Cameron, in further explanation of the report and in
answer to Members’ questions, the Committee agreed to note the update
provided. 
(b) FIRE AND RESCUE SCRUTINY REPORT 
A report was submitted by the Local Senior Officer, Scottish Fire and Rescue
Service providing appropriate performance data against priorities in the West
Dunbartonshire Local Fire and Rescue Plan. 
After discussion and having heard Group Commander Kevin Rennie and
Watch Commander Chris Spence, Argyll and Bute, East and West
Dunbartonshire, Scottish Fire and Rescue Service, in further explanation of
the report and in answer to Members’ questions, the Committee agreed to note
the update provided. 
HOUSING EMERGENCY DECLARATION ACTION PLAN 
A report was submitted by the Chief Officer -  Housing providing an updating on the
Housing Emergency Declaration Action Plan (HEDAP) which was formulated to
Page 8

Page 9

address the emergency following the Council’s housing emergency declaration on
1st May 2024. 
After discussion and having heard the Chief Officer - Housing and the Housing
Development and Homelessness Manager in further explanation and in answer to
Members’ questions, the Committee agreed:- 
(1) to note the progress to date and the implementation of the key actions of the
Housing Emergency Declaration Action Plan as summarised in paragraphs
4.1 - 4.10 of the report and in the action plan update within Appendix 1 of the
report; and 
(2) to note the Chief Officer - Housing would continue to bring an update report to
future Housing and Communities committee meetings. 
MORE HOMES WEST DUNBARTONSHIRE – WEST DUNBARTONSHIRE
COUNCIL AFFORDABLE HOUSING SUPPLY DELIVERY PROGRAMME 
A report was submitted by the Chief Officer - Housing providing an update on
progress with West Dunbartonshire’s More Homes Programme, which oversees the
delivery of the Council’s new home building programme. 
After discussion and having heard the Chief Officer - Housing, the Housing
Development and Homelessness Manager and the Housing Operations Manager, in
further explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the content of the report and the progress made to date in the delivery
of the Council’s More Homes West Dunbartonshire approach, including the
final handover of new homes at the zero carbon Pappert and Mount Pleasant
developments which completed two significant housing-led regeneration
projects; 
(2) to approve a temporary suspension of letting activity at Young Street
Sheltered Housing Complex until the consultation exercise is completed,
regarding future housing provision at Young Street/West Thomson Street; and 
(3) to approve the Chief Officer - Housing, to directly award a design and build
contract to deliver the Silverton regeneration project up to the budgeted costs
for project (Dumbuie Avenue and Smollett Road). 
SCOTTISH SOCIAL HOUSING CHARTER/REGULATION OF SOCIAL HOUSING
IN SCOTLAND ANNUAL UPDATE REPORT 
A report was submitted by the Chief Housing - Officer providing an annual progress
report on meeting the requirements of the Scottish Social Housing Charter and the
Scottish Housing Regulator’s Regulatory Framework for social housing, including the
approval of the Annual Assurance Statement. 
Page 9

Page 10

After discussion and having heard the Chief Officer - Housing and the Contracts
Manager; in further explanation and in answer to Members’ questions, the
Committee agreed:- 
(1) to note the content of the current Engagement Plan published by the Scottish
Housing Regulator (SHR) on 31 March 2025; 
(2) to note performance in terms of achieving the Scottish Social Housing Charter
(SSHC) outcomes during 2024/25; 
(3) to note that a comprehensive assessment of 2024/25 performance has been
carried out and that this has informed a Charter Improvement Plan covering
all the outcomes within the SSHC; 
(4) to note the key areas of focus for the Housing Improvement Board (HIB)
during 2025/26 which are outlined at paragraph 4.16 of the report; 
(5) to note that our assessment of 2024/25 performance will inform the production
and publication of the annual Charter Performance Report for tenants and
other customers; 
(6) to approve the Annual Assurance Statement (AAS), attached as Appendix 1
of the report, to be signed by the Housing and Communities Committee
Convener, on behalf of the Committee and submitted to the Scottish Housing
Regulator as per regulatory requirement; 
(7) to note and commend the achievements of the West Dunbartonshire Tenants
and Residents Organisation (WDTRO) in receiving national recognition for its
work by being awarded the “Tenant Group of the Year” and Outstanding
Achievement Award” from the Tenant Participation Advisory Service Scotland
(TPAS Scotland); and 
(8) to agree that a further progress report on the Scottish Social Housing Charter
be submitted to the November 2025 meeting of the Committee, which will
include benchmarking data comparing the Council’s performance against all
local authorities in Scotland, as well as Wheatley Homes Glasgow. 
HOME AT THE HEART - WEST DUNBARTONSHIRE’S RAPID RE-HOUSING
TRANSITION PLAN UPDATE AND NEW APPROACHES TO HOMELESSNESS
PROGRESS REPORT 
A report was submitted by the Chief Officer - Housing providing an update on “Home
at the Heart” WDC’s Rapid Re-housing Transition Plan (RRTP) for the period 2019-
25 and new approaches to homelessness. 
After discussion and having heard the Chief Officer - Housing, the Housing
Development and Homelessness Manager and the Housing Operations Manager in
further explanation and in answer to Members’ questions, the Committee agreed:- 
Page 10

Page 11

(1) to note and agree the progress and challenges made in the six years of
“Home at the Heart”, which will inform a report to the Scottish Government at
the start of October 2025 and note the main objectives for Year 1 of “More
than a Roof” in paragraphs 4.27 – 4.43 of the report; 
(2) to note that the Council’s housing allocation letting target for homeless
households is 59% for 2025/26, as set out in paragraph 4.35 of the report and
note the Chief Officer - Housing will keep this target under close review based
on current modelling projections; 
(3) to note the continued uncertainty around future funding referenced in
paragraph 6 of the report; and 
(4) to note that Scottish Government funding of £257,000 has been awarded for
2025/26 for the specific delivery of West Dunbartonshire’s Housing Solutions
Strategy. 
(5) that the Housing and Communities Committee Convener, in conjunction with
the Chief Officer – Housing, write to both the Scottish Ministers and
Westminster to highlight the challenging situation being experienced with
Utility Companies which is hampering progress of delivery and directly
affecting residents. 
BUILDING SERVICES PROCUREMENT PROVISION UPDATE 
A report was submitted by the Chief Officer - Housing advising of updated tender
requirements information for Building Services and seeking approval for the award of
contracts by the Chief Officer - Housing to successful bidders. 
Reference was made to two Briefing papers which had been circulated prior to the
meeting. 
ADJOURNMENT 
The Chair adjourned the meeting for a short recess. The meeting reconvened at
11.40 a.m. with all those Members listed in the sederunt in attendance. 
After discussion and having heard the Chief Officer - Housing, the Contracts
Manager and the Procurement Manager in further explanation and in answer to
Members’ questions, the Committee agreed:- 
(1) to note the contents of the report; 
(2) to approve the contract award to the contractors listed within the table in
paragraph 4.2 of the report; and 
(3) that any reference to GKL Plumbing & Heating Ltd be amended to GKL
Facilities Services Ltd.
Page 11

Page 12

CAPITAL BUDGETARY CONTROL REPORT TO 30 JUNE 2025 (PERIOD 3) 
A report was submitted by the Chief Officer - Resources providing an update on the
HRA capital programme to 30 June 2025 (Period 3). 
After discussion and having heard the Chief Officer - Housing and the Housing
Development and Homelessness Manager, in further explanation and in answer to
Members’ questions, the Committee agreed:- 
(1) to note the current position of the 2025/26 HRA capital estimates and the
HRA Capital Plan; 
(2) to note that in year financial performance would be monitored against a
2025/26 capital expenditure estimate of £55.547m and a 2025/26 capital
income estimate of £6.290m, a forecast borrowing requirement of £49.257m; 
(3) to note that project life performance would be monitored against a project life
expenditure estimate of £345.311m and a project life income estimate of
£80.378m, a five-year borrowing requirement of £264.933m; and 
(4) to note that at this early stage all projects are on track regarding achieving
their planned completion dates and delivering within the updated capital
estimate. 
HOUSING REVENUE ACCOUNT (HRA) BUDGETARY CONTROL REPORT TO 30
JUNE 2025 (PERIOD 3) 
A report was submitted by the Chief Officer - Resources advising of the 2025/2026
HRA revenue budget position on 30 June 2025 and the forecast position of the HRA
reserves as of 31 March 2026. 
After discussion and having heard the Chief Officer - Housing in further explanation
and in answer to Members’ questions, Councillor Gurpreet Singh Johal, seconded by
Councillor David McBride moved that the Committee:  
The Committee agrees to the recommendations at paragraph 2.1 of the report to: 
(1) note the HRA revenue account is forecasting a deficit of £0.282m. If required,
HRA reserves will be used to fund the adverse variance. 
(2) note that the forecast deficit would reduce HRA reserves to £0.329m on 31
March 2026. 
(3) note that forecast HRA revenue reserves are less than the HRA revenue
prudential target for 31 March 2026 of £1.160m; and 
Page 12

Page 13

(4)  note that work will continue to explore opportunities to remove the in-year
deficit and to rebuild reserves, including the targeting of efficiencies across all
areas of the HRA revenue account budget. 
In addition, Committee notes the motion approved by the IRED Committee on
13th August 2025 which included the requirement the Housing and Communities
Committee to approve: 
That subject to Housing and Communities Committee approval and subsequent
Council approval, Greenspace services are restored as follows: 
One-Off Costs for the Current year 2025/26 to:
Apply a one-off cost of £65,000 from the HRA reserves to fund additional grass
cutting capacity over the rest of the year at a cost of £65,000. 
Contribute £75,000 towards the costs of the retention of ten seasonal workers to
cut back the areas of long grass to the 2024/25 levels. 
Recuring costs for financial year 2026/27 to:
Increased recurring cost to fund grass cutting services at a cost of £150,000 to
the Housing Revenue Fund for 2026/2027. 
The Housing and Communities Committee agree the above proposals relating to
the Housing Revenue Account (subject to consultation with the West
Dunbartonshire Tenants and Residents Organisation in respect of the 2026/27
costs) and approval of the General Spending commitment at Council. 
The stepped approach means next year that we will restore our grass cutting
service capacity to its 2024/25 levels in a planned and achievable way. 
As an amendment, Councillor Sophie Traynor, seconded by Councillor Ian Dickson,
moved that: 
Committee notes with concern the Labour Administration’s Greenspace
motion, which proposes to remove £140,000 from the Housing Revenue
Budget in the current year and a further £150,000 in 2026/27. 
Committee recognises that the Housing Revenue Budget is already under
severe financial pressure, with West Dunbartonshire Council having declared
a Housing Emergency in 2024 as a result of the extreme pressures facing
housing and homelessness services. Committee believes that diverting
money ringfenced for housing will only worsen these challenges and
exacerbate the crisis, placing an unfair burden on council tenants who may
face increased rents as a direct consequence. 
Committee further notes that no consultation has taken place with tenants
regarding the use of their rent contributions for general greenspace
maintenance, and that the West Dunbartonshire Tenants and Residents
Organisation (WDTRO) has expressed clear opposition to these proposals. 
Page 13

Page 14

In light of these concerns, Committee does not support the removal of money
from the Housing Revenue Budget for this purpose and agrees that the matter
should be referred to next week’s meeting of full Council, to ensure that all
elected members have the opportunity to represent their constituents on such
an important financial decision. 
On a roll call vote being taken 5 Members voted for the amendment, Provost Murray
Congahan and Councillors Crawford, Dickson, Oxley and Traynor and 6 Members voted
for the motion namely, Councillors Johal, McBride, McGinty, O’Neill, Rooney and Sorrell.
The motion was, accordingly, declared carried. 
GENERAL FUND HOUSING AND COMMUNITIES FINANCIAL REPORT 2025/26
AS AT PERIOD 3 (30 JUNE 2025) 
A report was submitted by the Chief Officer - Resources providing an update on the
financial performance to 30 June 2025 (Period 3) of General Fund Revenue services
under the remit of the Housing and Communities Committee. 
After discussion the Committee agreed:- 
(1) to note that the account currently showed a projected annual adverse
variance of £0.097m (10.8% of the net expenditure budget); and 
(2) to note the progress on efficiencies incorporated into 2025/2026 budgets. 
The meeting closed at 12:57 p.m.
Page 14

Page 15

OFFICIAL
OFFICIAL     
West Dunbartonshire
Performance Summary Report 
Reporting Period: April to Sep 25
Total Crime 952 Crimes
Incidents
13,538
Dishonesty Crimes
1044
Domestic Abuse Inc 
806
+12.7% +12.7% +6.6%
+3.3% +40.6% +7%*
Road Deaths &
Serious Injuries
15
-0.8%*
Sexual Crime
149
-166*PYTD +64*PYTD, +114*5YR AVG +118*PYTD, +240*5YR AVG +50*PYTD, +119*5YR AVG
+24*PYTD, +128*5YR AVG +43*PYTD, +45*5YR AVG +1*on PYTD  -14*PYTD
Violent Crime
784 
Missing People
128 Counter Terrorism
-35*PYTD
-21.5%*
+7*PYTD, -7*5YR AVG
Common Assault
575
+10%
Housebreaking
74 
Disorder Complaints
1849
The National Terrorism Threat level is 
SUBSTANTIAL
This means that an attack is likely. 
*PYTD = Previous Year to Date
*5YR = 5 year average 
+19%
-1.2%
ITEM 7a
Page 15

Page 16

OFFICIAL 
SECTION PAGE NUMBER 
Introduction 2 
Executive Summary 3
Demand Analysis 4
Acquisitive Crime 5
Public Protection 6
Road Safety 7
Serious Organized Crime 8
Violence  9
Antisocial Behaviour 10
Public Confidence - Complaints & Allegations 11
Introduction 
I am pleased to present this performance summary report to the West Dunbartonshire Housing
Committee for its information and consideration. The Reporting Period for this report is cumulative for
Quarters 1 to 4 of 2025/26, with available figures being shown from 1st April 2025 through to 30th Sep
2025. 
Please note that all data included in this report are management information and not official statistics.
All data are sourced from Police Scotland internal systems and are correct as of date of publication.
Unless stated otherwise numerical comparisons are against the previous year to date and the previous
five year average for the same data period specified. 
Crimes and offences are grouped under recognised categories for statistical purposes. The Scottish
Government defines these categories, as follows: 
Group 1 - Non Sexual Crimes of Violence  Group 6 – Anti-social offences 
Group 2 - Sexual Crimes  Group 7 – Miscellaneous Offences 
Group 3 - Crimes of Dishonesty  Group 8 – Road traffic offences
Group 4 – Damage and reckless behaviour PYTD  - Previous Year to Date 
Group 5 – Crimes against society CYTD - Current Year to Date 
Page 16

Page 17

OFFICIAL 
PRIORITY
AREA EXECUTIVE SUMMARY 
Acquisitive
Crime    At the end of Qtr. 2, acquisitive crimes have increased by 12.7% from 926 to
1044 crimes compared to the same period last year. This is largely attributed to
a rise in common thefts (+41), fraud (+25) and vehicle crime (+47) during
2025/26. 
Public
Protection  
Group 2 sexual crimes have also risen by 40.6% with 149 crimes recorded
compared to 106 at the end of 2024/25. This is largely due to an increase in the
number of crimes relating to indecent images/communications from 26 to 65
crimes with the majority predominantly being committed via online platforms.
Sexual assaults have also increased slightly from 32 to 37, albeit non-recent
reporting continues to account for a significant proportion of these crimes. 
Road Safety
& Road Crime
The number of fatal road traffic collisions within West Dunbartonshire has risen
marginally at the end of Qtr. 2 with only one recorded compared to zero in
2024/25. 
Road traffic collisions resulting in serious injuries have remained static compared
to the position last year with 14 recorded while those resulting in slight injuries
have reduced by 6. 
Serious
Organised
Crime 
As at the end of Qtr. 2, drugs supply crimes show a reduction of 41% from 46 to
24 crimes while possession charges have also decreased from 246 to 220
crimes.   
Across Argyll & West Dunbartonshire 19 crimes linked to persons associated
with serious and organised crime have been recorded and £37,109.44 has been
seized under POCA since 1st April 2025. 
Violence &
ASB 
At the end of Qtr. 2, Group 1 crimes of violence have increased by 3.3% with
784 crimes compared to 759 the previous year to date. Anti-social behaviour
(ASB) related crimes have also risen from 593 to 712 due to increases in breach
of the peace/threatening abusive behaviour (+128) compared to last year. 
1. Acquisitive Crime
2. Public Protection
3. Road Safety & Road Crime
4. Serious Organised Crime   
5. Violence & Anti-social behaviour
WEST DUNBARTONSHIRE POLICING PRIORITIES 2023-2026
Page 17

Page 18

OFFICIAL 
CRIME PYTD CYTD INCIDENTS PYTD CYTD
Total Crimes &
Offences 5001 5953 Total number of
incidents 13,704 13,538
DEMAND ANALYSIS - * PYTD - PREVIOUS YEAR TO DATE CYTD - CURRENT YEAR TO DATE
* *
*
*
The total volume of crimes and offences recorded within West Dunbartonshire has seen an
overall increase when compared to the previous year while the current figure is also above the
previous 5-year average (+19%). Most crime types have experienced an increase compared to
last year, with the exception of a slight reduction in crimes relating to damage and reckless
behaviour (-4.4%). Road traffic offences (+48.8%) continue to experience the most significant
increase year on year from 1230 to 1830 crimes followed by antisocial offences (+20.7%) (+119)
and acquisitive crimes (+12.7%) (+118). 
Page 18

Page 19

OFFICIAL 
ACQUISITIVE CRIME
At the end of Qtr. 2, shoplifting crimes have seen a reduction of 4.7% compared to the
previous year from 423 to 403 but remains above the previous 5-year average. Year to
date an additional 7 shoplifting crimes have been detected year on year, while the detection
rate has risen from 50.4% to 54.6%. 
Motor vehicle crimes have increased by 78.3%, which is due to a continued rise in thefts
from motor vehicles from 14 to 59 crimes, which is also considerably above the previous
5-year average (22). The increase has largely been attributed to now arrested repeat
offender whose MO was to target insecure (unlocked) vehicles for personal belongings at
various loci in both Clydebank and Alexandria. The DR for vehicle crime is at 30.8% (-5.8%
PYTD). 
Fraud crimes have seen an increase of 22% as at the end of Qtr. 2 from 113 to 138 crimes
and remains above the 5-year average of (109). The increase is largely due to a notable
rise in frauds involving stolen credit/debit cards (+30), while the majority of online based
frauds such as social engineering and online market frauds have seen slight reductions.
The DR for fraud crime is currently at 32.6%, which is a considerable rise from 9.7% PYTD. 
Common thefts have risen by 19% compared to the previous year from 215 to 256 crimes,
which is currently above the 5-year average of (212). The detection rate has increased,
rising from 25.1% to 28.9% year on year. In number terms an additional 20 crimes have
been detected. 
The overall increase in acquisitive crime has reduced substantially from 35% above PYTD at
the end of Q1 to 12.7% above PYTD at the end of Q2.
Our increased patrols and engagement around retail outlets is showing to be having a positive
impact with an encouraging 4.7% reduction in shoplifting offences coupled with an increased
detection rate. We are currently in discussion with COPFS regarding the submission of
applications for criminal ASBOs (CRASBO) which would, if granted, place restrictions on the
highest tariff offenders regarding retail premises and areas attended etc. providing retail
workers with protection from repeated criminality.
Fraud remains a national issue, we are continually providing advice and guidance via social
media and in-person on how to best protect yourself online and when using online payment
methods. This have been supported with national media coverage, and indeed, specific fraud
action programmes, on television. We will maintain our efforts in this area of criminality which
is a worldwide epidemic.               
Page 19

Page 20

OFFICIAL 
Due to the very nature of rape and sexual offence enquires, they are often protracted, hence, the
detection rate for rape offences having reduced greatly at the conclusion of Q1 has now been
restored to 87%.  Often these enquiries can run over multiple reporting periods which causes the
detection rate to fluctuate while the enquires are still progressing.
We are utilising social media and personal safety inputs to highlight and warn against the dangers
of online sexualised activity. We have used resources specifically targeting Sextortion and warning
of the repercussions of becoming involved online with persons unknown.
Our Youth Engagement Officers are working closely with staff from The Rosey Project to deliver
workshops targeting misogynistic behaviours, online sexual violence and consent. These inputs
are being very well received as we look at altering the behaviours of individuals at a young age to
positively impact on the domestic violence and sexual offence stats of the future.            
Continued work with Adult Accommodation Centres, Children’s Houses and with those suffering
from dementia and their families, has continued to reduce the number of persons being reported
missing which can have a very heavy impact on resources over prolonged periods while putting
individuals at great risk.    
At the end of Qtr. 2 2025/26, Group 2 crimes have increased by 40.6% (+43) compared to the same
period last year. Sexual assaults continue to show a slight increase from 32 to 37 crimes while rape
offences have reduced 32% from 32 to 25. Much of the overall rise in Group 2 figures is due to an
increase in online sexual activity involving indecent images/communications.   
Approximately 96% of rape crimes occurred in a private space setting with the majority being committed
by persons known to the victim. Similarly, around 73% of sexual assaults also occurred in a private
place and 90% of crimes were committed by persons known to the victim. Just under half of all sexual
assaults (46%) recorded during the current reporting period related to non-recent reports. Both the
detection rates for rape and sexual assault have risen by 35.3% and 40% respectively. 
Crimes relating to indecent images/communications have experienced a considerable increase
compared to last year from 26 to 65 crimes with the majority being committed by strangers via online
platforms. Approx. 25% of recorded offences relate to two repeat offenders. 
The number of domestic abuse incidents has increased by 6.6% compared to PYTD from 756 to 806,
while the number of crimes recorded have also risen by 13.2% from 539 to 610 as at the end of Qtr. 2.
The crime/incident conversion rate has reduced marginally from 50.8% to 49.3%. A total of 128 missing
person reports had been recorded by the end of Qtr. 2, which is a decrease of 21.5% from 163 last
year. 
PUBLIC PROTECTION
Page 20

Page 21

OFFICIAL 
At the end of Qtr. 2, the number of fatal road collisions in West Dunbartonshire, has risen marginally
from the position last year with one recorded compared to zero in 2024/25. Serious injuries are
currently unchanged year on year with 14 recorded during both periods however the number the
number serious injuries involving children have risen from zero to two. 
Offences relating to motor vehicles have seen a considerable increase of 48.8% from 1230 to 1830
(+600). Speeding offences have experienced the highest increase (+274) followed by vehicle
defect such as construction and lighting offences (+138) and unlawful use of motor vehicle such
as licence, insurance and registration offences (+113). The increase in vehicle offences is
testament to proactive policing within West Dunbartonshire throughout 2025/26.     
Road Traffic Casualties 2024/25 2025/26 
Number of persons killed on our roads 0 1
Number of persons seriously injured 14 14
Number of persons slightly injured 20 14
Number of children seriously injured 2 0
Our traffic offences continue to increase which is testament to our specialist road policing
officers, supported by their response colleagues, targeting those drivers who are putting
people’s wellbeing at risk. That may be via their driving standards or due to the condition of the
vehicles being driven on the roads. 
The circumstances of any fatal road crash, currently sitting at one for the reporting period, are
investigated thoroughly by national specialist crash investigation teams. 
At our Road Safety Partnership, which involves partners from the Local Authority, Roads,
Transport Scotland and others, we now review all fatal crash scenes and circumstances to
ensure that any contributory factor that can be altered, is altered, to reduce the chance of any
further accidents at the same location. 
During this reporting period we commenced our Fatal 5 - Young Drivers Campaign. We are
committed to protecting all road users, particularly the vulnerable. Despite updated legislation
and increased penalties, the following Fatal 5 offences remain prevalent – 
Speeding – Drink & Drug Driving – Mobile Phone Use – Careless Driving – No Seatbelt 
Our campaign aligns with an NPCC UK-wide campaign intended to educate young drivers
against these risk-taking driving behaviours. Our intentions are to: 
Influence road user behaviour and increase the safety of our roads. 
Enforce relevant legislation through the detection of offenders and reduce the occurrence of
collisions, particularly those with a Fatal 5 causation factor. 
Utilise social media to highlight risks associated with Fatal 5 driving behaviours.       
ROAD SAFETY AND ROAD CRIME
Page 21

Page 22

OFFICIAL 
Across Argyll & West Dunbartonshire, 19 crimes linked to persons associated with serious and
organised crime have been recorded and £37,109.44 has been seized under POCA since 1st April
2025.  
As at the end of Qtr. 2, drug supply charges have reduced from 46 to 24 crimes, which is currently
below the previous 5-year average (40), while production/cultivation of drugs have marginally
increased by 2. Drug possession charges have seen a reduction of 10.6% from 246 to 220 crimes. 
The total value of monies seized under POCA has increased by 107.2% since the end of Q1
rising from £17,910 to £37,109.44 at the end of this reporting period.   
This reporting period was dominated by the visit of The President of The United States, Donald
Trump, which was followed shortly thereafter by the visit of Vice President, J D Vance. Both
visits, more so POTUS, were very resource intensive and like every policing division across the
country, L Division had to provide significant resources to the operations for a sustained period
to ensure the visits passed off safely and without major incident. The policing operation was
commended by the Chief Constable and First Minister John Swinney. Unfortunately, such a level
of demand impacts on pro-activity which sits out with normal daily routine police business which
was not impacted upon due to an alteration to the working pattern of all officers.   
Although pro-active work was impacted upon, which includes activity around intelligence relating
to the distribution of drug supply, all intelligence gleaned during the visits is now being
progressed.  
Although drug supply charges remain behind the PYTD figure, we have increased this figure
significantly since the end of Q1, rising from 8 to 24 showing that we are already making
significant improvements in this area of criminality.   
As reported at the end of Q1, The Flexible Policing Unit was established, which will be utilised
to progress intelligence concerning all areas of criminality across the authority. 
DI Michael Lochrie took over management of the SOCT based at Dumbarton. Michael brings
many years of experience from being based within our National Organised Crime & Counter
Terrorism Unit to the division which will a great asset as we continue to target those involved in
serious crime.            
SERIOUS & ORGANISED CRIME
Page 22

Page 23

OFFICIAL 
VIOLENCE & ANTI-SOCIAL BEHAVIOUR
Continued decreases in both robberies and serious assaults for the second quarter after similar
decreases in Q1 is very satisfying. Fewer crimes equate to less victims of what are, serious
offences, some of which can have prolonged impact on victims. This reduction is at least in part
attributed to our continued scrutiny and proactivity around high tariff domestic offenders and
persons subject of MAPPA conditions.  
Through our seat on the Alcohol & Drug Partnership (ADP) we are involved in work around the
prevalence of alcohol and other substances in criminality including violence. We are working
as a partnership looking at the hospital admittance stats involving alcohol and / or drugs across
West Dunbartonshire. This work will help direct our policing plan to best ensure our resources
are at the correct locations and the correct times to deter those individuals’ intent on becoming
involved in ASB & violence.
The ADP will also be objecting to any future alcohol licence applications that they feel would
fall into the over-provision of alcohol category in a particular area.         
Levels of violence in West Dunbartonshire overall have slightly increased by 3.2% from 759 to
783 (+24) crimes. Approx. 55% of all crimes took place in a private place. Furthermore, almost
40% of public space crimes were committed by persons known to the victim. The overall increase
is largely attributed to a 12.6% rise in common assaults (+64 crimes) compared to last year. 
Both the number of serious assaults and robberies have decreased year on year from 43 to 30
crimes (-30.3%) and 21 to 20 crimes respectively. Approx. 64% of serious assaults occurred
within a public space and around 60% of crimes were committed by persons known to the victim.
Half of crimes were committed whilst the victim and/or offender was under the influence of alcohol. 
Robberies were largely spit 60/40 public/private space with 9 crimes occurring within a residential
premise and 8 related to street robberies. The remaining crimes occurred within a commercial
locus. Two thirds of robbery crimes were committed by persons known to the victim with 3 being
domestic related. 
The detection rate for robbery has reduced by 16.4% from 71.4% to 55%, while the DR for serious
assault remains relatively unchanged at 66.7% from 67.4% PYTD. 
Page 23

Page 24

OFFICIAL 
Common assaults continue to experience with an increase of 12.6% from 510 to 574 which is
currently above the 5-year average (460). Common assaults on police and emergency workers
have also risen marginally by 3% (+3 crimes) compared to PYTD. Around 58% of common
assaults occurred in private space settings and in 48% of public space crimes, offenders were
known to victims. The detection rate for common assaults overall has increased marginally from
56.5% to 57.5%, which equates to an additional 42 crimes being detected. 
Across the recording period the number of ASB related calls to Police Scotland has increased
slightly by approx. 3% compared to last year. Similarly anti-social related offences (Group 6)
have increased by 20% with 712 crimes recorded compared to 593 PYTD, however the current
figure remains marginally below the previous 5-year average (717). 
VIOLENCE & ANTI-SOCIAL BEHAVIOUR 
This reporting period seen the conclusion of Operation Ballaton for 2025, which ran from April
2025. YTD we are showing a 3% rise in ASB related calls to the police and a rise in ASB
related offences. Given the very pleasant weather for prolonged periods this year, we
increased our policing footprint across the Balloch and south Loch Lomond areas to match the
vastly increased numbers attending in these areas. By far, the vast majority of people visiting
the area were well behaved and did not cause any issue. However, on occasion, we did
encounter ASB but due to pre-planning with our WDC, BTP and NP partners, we were able to
deal with such situations swiftly and robustly to minimise any negative impact on the local
community. Such police activity does increase the ASB crime figures, but it is important that
we provide these communities with a professional and impactful service during the busy
summer months.
Our stop & search figures have been impacted upon by the resource demand for the visit of
the US President through this reporting period and we are confident this figure will increase
through proportionate activity as we progress towards the year end and into 2026.                 
Page 24

Page 25

OFFICIAL 
PUBLIC CONFIDENCE: COMPLAINTS & USER SATISFACTION
Overall satisfaction with Police Scotland
User Satisfaction results show that locally, public confidence levels remain high within Argyll and
West Dunbartonshire with overall satisfaction levels at 77%, which is above the position as at the
end of Qtr. 2 during the 2024/25 reporting period (69%). 
Overall satisfaction nationally with contacting the police was at 67% in Quarter 2, down four percentage
points from the previous quarter. Satisfaction remained between 68%-74% in the past 2024-25 financial year.
Detailed below are our User Experience results for L Division.
Overall Satisfaction
(3,814)
L Division
(146)
Argyll & Bute
(38)
West Dunbartonshire
(47) 
67% 71% 79% 68% 
In September 2025 a new jointly
sponsored project collaboration
between SCRA and Police Scotland
commenced. The project focus is on a
shared goal to ensure that the right
children are referred to SCRA at the
right time in their own unique service
journey. To support this objective, the
new project involves a Children’s
Reporter working within our Risk and
Concern Hub. Whilst within the hub,
the reporter will work alongside Police
Scotland in the following activities:
 Establishment of a Children’s
Hearing Champion model –
training, enabling and
supporting officers to become
subject matter experts in the
operation of the Children’s
Hearing System
 Support of the Concern Hub –
the Reporter will work
collaboratively with police, from
within the Hub, around the
referral to SCRA processes. 
77%
Satisfied/Very
Satisfied
Total of 
298
responses
Page 25

Page 26

Page 26

Page 27

Scrutiny Report
2025-26 Q2
West Dunbartonshire Performance and
Scrutiny Group
West Dunbartonshire
ITEM 7b
Page 27

Page 28

202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
About the statistics within this report
The activity totals and other statistics quoted within this report are published in the interests of
transparency and openness. They are provisional in nature and subject to change as a result of ongoing
quality assurance and review. Because all statistics quoted are provisional there may be a difference in
the period totals quoted in our reports after local publication which result from revisions or additions to the
data in our systems. The Scottish Government publishes official statistics each year which allow for
comparisons to be made over longer periods of time.
Summary
Trends
Accidental Dwelling Fires (ADFs)
Accidental Dwelling Fire Casualties
Non-Fire Casualties
Deliberate Fires
Non-Domestic Fires
Unwanted Fire Alarm Signals (UFAS)
Road Traffic Collisions (RTCs)
Home Fire Safety Visits (HFSVs)
Fire Safety Enforcement
Community Safety & Engagement
Glossary of Terms
1
2
3
4
5
6
7
8
9
10
11
12
13
Contents
Scrutiny Report
2025-26 Q2
West Dunbartonshire Performance and
Scrutiny Group
West Dunbartonshire
Page 28

Page 29

2025-26 Q21. Summary
114
Fires
66 110
False Alarms
290
12 0 0
Fire Fatalities
9 1
28
UFAS
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Non-Fire Incidents
People Rescued by
Firefighters
People Receiving
First Aid or Hospital
Treatment (Non-Fire)
People Receiving
First Aid or Hospital
Treatment (Fires)
Non-Fire Fatalities
Top 10 Incident Types
Fire
(Outdoor)
False Alarm
(Due to
Apparatus)
Inter-Agency False Alarm
(UFAS)
False Alarm
(Good Intent)
Fire (Building) Fire (Vehicle) Humanitarian Flooding /
Water
Rescue
Other
Non-Fire
80
51
29 28 26 24
10 10 8 8
Fire Safety AuditsHome Fire Safety Visits
Total Incidents
(Incl. Incompletes)
36107
In this report, the Scottish Fire and Rescue Service(SFRS) has demonstrated a strong commitment to public safety. 
We attended a range of operational incidents, which are detailed above. Home Fire Safety Visits(HFSV) continue to be a 
priority, and we conducted 107 visits over this recording period. Details of our new HSFV referral pathway are included in 
section 12 of the report. Fire safety audits and community engagement initiatives remain proactive measures, ensuring     
our communities are safer places to work, live, and visit. 
The overall trend in this report reflects a steady management of all incidents, with fluctuations reflecting seasonal 
variations. Accidental dwelling fires are well monitored, while the service also continues to focus on reducing deliberate     
fires and non-fire incidents. The data provided highlights a well-coordinated approach to fire prevention and emergency     
response.
Page 29

Page 30

2. Trends Previous 16 quarters (4 years)
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Accidental Dwelling Fires
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
27
19
34
18
33
23
33
26
29
24
29
25
29
26
29
31
Deliberate Fires
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
70 81
182
30
178
45
168
71
84
65
87
49
73
94 90
56
Non-Domestic Fires
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
3 0
11
7
4
10 9
4
6
8
6
55
7
6 5
Unwanted Fire Alarm Signals
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
123
28
136
25
83 52
119
101
31
4651
101
34 3542
108
Road Traffic Collisions
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
5
8
12
2
9
4
7
7
9 8
7
56
8
5
7
Page 30

Page 31

2. Trends
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Previous 16 quarters (4 years)
Accidental Dwelling Fire Casualties
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
3
0
9
0 2
5
6
3
1
2
6
2
1
2
2
4
Non-Fire Casualties
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
8
1014
3 3
6
7
9
5
8
6
4 4
6
6
3
Road Traffic Collision Casualties
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
1
99
0 0
6
1 1
3
1
3
22
3
1
2
Home Fire Safety Visits
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
341
107
73
199
239
203
264260
220
239
106
227 229 213
300
224
Fire Safety Audits
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
9
36
46
1 19
35
1617
14
23
18
12
23 22
11
37
Page 31

Page 32

202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Accidental Dwelling Fires
in this period
Extent of Damage Incidents

Not applicable 14
Limited to item 1st ignited 5
Source of Ignition (Top 10)
Other domestic style appliance Electricity supply Smoking Related
15
2
1 1
Trend by Quarter (4 years)
15
20
25
30
35
19
Incidents by Ward
Clydebank Central
Clydebank Waterfront
Dumbarton
Kilpatrick
Lomond
Leven
4
4
4
4
2
1
2025-26 Q23. Accidental Dwelling Fires
SFRS is dedicated to reducing accidental dwelling fires in domestic properties across Scotland. This commitment is evident through 
our proactive measures, community engagement, and continuous improvement strategies. 
SFRS employs a range of proactive measures to prevent fires before they start. One of their key initiatives is the HFSV program, 
where Community Action Teams and Operational Crews visit homes to assess fire risks and provide tailored advice on fire prevention.
These visits often include the installation of smoke alarms and heat detectors to comply with Scottish Government legislation thus
ensuring that homes are equipped to detect fires early. 
Over this quarterly reporting period we see a decrease in accidental dwelling fires across West Dunbartonshire from 29 to 19. 
Page 32

Page 33

4. Accidental Dwelling Fire Casualties
Non-Fatal
Casualties
Fatal
Casualties
Nature of Injury/Cause of
Death
Casualties

202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Trend by Quarter (4 years)
0
5
10
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
First Aid Given
at Scene
Hospital Slight
Injuries
Hospital Serious
Injuries
2025-26 Q2
0 0 1
0 0 0
SFRS is committed to reducing accidental dwelling fire casualties across all communities in Scotland. This dedication is
reflected in our comprehensive reduction strategies, community-focused initiatives, and continuous efforts to improve fire
safety.
Through strategic initiatives, community engagement, a data-driven approach, support for vulnerable groups, and 
continuous improvement, we strive to make every home in Scotland safer. Our efforts not only save lives but also foster
a culture of fire safety awareness and prevention within our communities.
Over this reporting period we have seen a decrease in accidental dwelling fire casualties from the previous quarter, from
2 to 0, which we will continue to monitor. There were no fatal dwelling fire casualties over this recording period.
Page 33

Page 34

5. Non-Fire Casualties
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Dumbarton
Leven
8
2
Trend by Quarter (4 years)
5
10
Non-Fatal
Casualties
Fatal
Casualties
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
First Aid Given
at Scene
Hospital Slight
Injuries
Hospital Serious
Injuries
Nature of Injury/Cause of Death Casualties

Bruising 6
Other medical condition 2
Cuts/Lacerations 1
Drowning 1
2025-26 Q2
9 1 11
5 3 1
Non- fire casualties encompass all other incidents we attend, including road traffic collisions, water rescues, and other specialist type incidents
that do not involve fire. 
Over this recording period we have seen an increase in non-fire casualties, from 3 to 10, which we will continue to actively monitor. 
Unfortunately, we have recorded one fatal casualty in this period. All casualties were non fire related, we attended to assist other agencies,    
such as Police Scotland and Scottish Ambulance Service.
Page 34

Page 35

6. Deliberate Fires
Property Type Incident

Refuse 36
Grassland, woodland and crops 24
Other outdoors (including land) 11
Road Vehicle 5
Non Residential 3
Dwelling 1
Other Residential 1
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Clydebank Waterfront
Leven
Clydebank Central
Dumbarton
Lomond
Kilpatrick
23
21
13
11
11
2
Trend by Quarter (4 years)
0
50
100
150
200
81
Deliberate Fires
in this period
2025-26 Q2
Hour of Day
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
We are committed to reducing deliberate fire setting, recognising the significant dangers it poses to communities and the environment. 
Deliberate fires can endanger lives, cause property damage, and divert valuable resources away from genuine emergencies. We have several 
strategies to reduce this type of incident including: 
Community Engagement: We actively engage with communities to raise awareness about the risks and consequences of deliberate fire 
setting. This includes educational programs aimed at children and young people in West Dunbartonshire Schools.
Collaboration with Partners: We collaborate with various partners, including Police Scotland, Community Wardens and with local schools.
Reporting and Prevention: We encourage the public to report any suspicious activities or build-up of rubbish that could potentially be set on fire
Over this reporting period there was a reduction in deliberate fires from 182 to 82
Page 35

Page 36

7. Non-Domestic Fires
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Non-Domestic
Fires in this
period
2025-26 Q2
Top 15 Property Types
Property Type Incidents

Accidental
Deliberate
Incidents by Ward
Extent of Damage
Trend by Quarter (4 years)
0
5
10
0
We are dedicated to reducing non-domestic fires, recognising the significant impact these incidents can have on businesses,
public buildings, and the wider community. Non-domestic fires can lead to substantial economic losses, disrupt services, and
pose serious risks to public safety. 
Our local fire safety enforcement team acts as an enforcing authority for fire safety legislation in non-domestic premises. 
This includes regular inspections and ensuring compliance with fire safety regulations. Our enforcement team is also there to
provide support and education to duty holders, including building owners, managers, and staff, to help them comply with 
current legislation.
Over this recording period we saw a reduction in Non-Domestic fires from 5 to 0. 
Page 36

Page 37

8. Unwanted Fire Alarm Signals
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Unwanted Fire Alarm
Signals in this period
2025-26 Q2
Top 15 Property Types
Property Type Incidents

Residential Home 11
Hospitals and medical care 7
Sheltered Housing - not self contained 5
Hotel/motel 3
Other holiday residence (cottage, flat,
chalet)
1
Sporting venues 1
Incidents by Ward
Clydebank Waterfront
Dumbarton
Lomond
Clydebank Central
Kilpatrick
Leven
8
7
6
4
2
1
Trend by Quarter (4 years)
50
100
28
SFRS introduced a new policy in 2023 aimed at significantly reducing Unwanted Fire Alarm Signals (UFAS). This initiative
is part of our ongoing commitment to enhance community safety and optimise the use of resources.
Unwanted Fire Alarm Signals are false alarms triggered by automatic fire alarm systems. These false alarms can be 
caused by various factors, including cooking fumes, dust, or lack of maintenance. UFAS incidents divert fire crews from 
genuine emergencies, leading to unnecessary costs and potential delays in response to real fires. 
Since the implementation of our revised policy, we continue to see a reduction in this type of incident, which is highlighted
by the reduction from 46 to 28, in this report.
Page 37

Page 38

9. Road Traffic Collisions
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
Road Traffic
Collisions in
this period
Non-Fatal
Casualties
Fatal
Casualties
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
First Aid Given
at Scene
Hospital Slight
Injuries
Hospital Serious
Injuries
2025-26 Q2
Incidents by Ward
Dumbarton
Clydebank Waterfront
Kilpatrick
Leven
Lomond
3
2
1
1
1
Trend by Quarter (4 years)
5
10
8
9 0 1
5 3 1
Property Type Incidents

Car 8
Incident Type Incidents

Vehicle (Non-fire) 7
Other Non-Fire 1
The SFRS is committed to reducing the number of Road Traffic Collisions (RTCs) across Scotland. Recognising the 
devastating impact these incidents can have on individuals, families and communities, we have implemented a range of 
strategies and initiatives aimed at prevention and effective response. 
We work closely with Police Scotland and attend the 'L' Division Road Safety Governance group on a quarterly basis. This
meeting allows stakeholders to identify new and existing risks and coordinate road safety strategies across West 
Dunbartonshire. 
We did see an increase in RTCs over this recording period from 5 to 8 incidents, which we will continue to monitor. 
Page 38

Page 39

10. Home Fire Safety Visits
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
11. Fire Safety Enforcement
Job Type Count

Audit 36
Consultation 5
Audits by Ward
Dumbarton
Leven
Clydebank Waterfront
Kilpatrick
Clydebank Central
Lomond
24
5
3
2
1
1
2025-26 Q2
HFSVs by Ward
Clydebank Waterfront
Dumbarton
Clydebank Central
Leven
Kilpatrick
Lomond
25
21
19
18
14
10
Home Fire
Safety Visits
107
The SFRS has recently introduced a new referral pathway for HFSVs, aiming to enhance community safety and better 
support vulnerable individuals. This initiative is part of our ongoing commitment to reduce fire risks and improve overall 
safety in homes across Scotland. 
The revised HFSV programme focuses on a more targeted approach, prioritising high risk individuals who meet specific 
eligibility criteria. These criteria are based on extensive research into factors that increase the risk of fire fatalities. The goal
is to ensure that those most vulnerable receive the necessary support and intervention to prevent fire incidents. 
Page 39

Page 40

12. Community Safety & Engagement
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on
2025-26 Q2
Water Safety Open Day - Lomond Shores 
The Lomond Shores Water Safety Day in 2025 was held on Friday,
July 25th, from 11 am to 4 pm. The event, organized by Water 
Safety Scotland, was held in support of World Drowning Prevention
Day. It featured activities like paddleboarding, canoeing, rescue 
demonstrations, water rescue dog teams, and stalls from various 
organizations, including the RNLI, Scottish Fire and Rescue Service,
and the police.    
Home Fire Safety Visits 
On February 12th, we launched a new referral process for Home Fire Safety Visits. 
This update aims to better target high risk individuals, streamline referrals with a new 
digital system, and enhance data sharing through a Data Sharing Framework (DSF). 
SFRS is also providing training and support to partner organisations to ensure effective
use of the new system. These changes reflect SFRS's commitment to improving fire 
safety and reducing fire related incidents across Scotland. 
For further information please contact: 
W.EWDABCommunitySafety@firescotland.gov.uk 
Safety Engagement Session at 
Community Fire Fighter Henderson, Watch Commander Canning and
Clydebank Red Watch, attended youth engagement event at Abu Bakr
Mosque and Community Centre. This was a great opportunity to deliver
water safety messaging while also showing the young people around   
the fire appliance.    
SFRS Community Action Team personnel from West Dunbartonshire,   
joined Working 4 U Literacy group to deliver CPR awareness.              
These sessions provide members of the group with the knowledge and
skills to potentially save lives
SCPR Sessions at Church Street
Page 40

Page 41

13. Glossary of Terms
Term - What it means
ADF
Accidental Dwelling Fire.
HFSV
Home Fire Safety Visit.
PDIR
Post Domestic Incident Response, a term used to indicate actions taken following attendance at a fire or
other incident in the home. PDIRs include amongst things the offer of a free follow up home fire safety
visit.
RTC
Road Traffic Collision.
Special Service
Calls to incidents which are not fires or false alarms such as RTCs, rescues, flooding, incidents involving
hazardous materials or the provision of assistance to other agencies.
UFAS
Unwanted Fire Alarm Signals. When an automatic fire detection and alarm system is activated as a result
of anything other than an actual fire the activation is classed as a false alarm. If an attendance is made to
such an event by the Scottish Fire and Rescue Service, then the event is recorded as an UFAS incident.
UFAS Policy Change
In response to COVID, on the 6th May 2020, the SFRS decided to send 1 pump to UFAS premises that
did not have their own Predetermined attendance (PDA).
As of 1st July 2023, the COVID interim 1 pump response was ended and a new UFAS policy was
implemented.
The new policy is to call challenge all UFAS incidents with the intention of non-attendance. Hospitals, care
homes, and sleeping risk premises are all exempt and receive either 2 pumps or their premise specific
PDA.
202504/11/25 © Scottish Fire & Rescue ServiceReport generated on Page 41

Page 42

Design, figures and charts by the Business Intelligence team.
Page 42

Page 43

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Housing Services 
Committee: Housing and Communities Committee 19 November 2025 
Subject: Housing Services Delivery Plan 2025/26 - Mid-year Progress 
1 Purpose 
1.1 This report sets out the mid-year progress of the Housing Services Delivery
Plan 2025/26. 
2 Recommendations 
2.1 It is recommended that Committee notes the progress achieved at mid-year. 
3 Background 
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks. 
3.2 The Housing Services Delivery Plan 2025/26 was presented to Housing and
Communities Committee on 7 May 2025 with a commitment to report mid-year
progress and year-end progress in November 2025 and May 2026
respectively. 
4 Main Issues 
4.1 Full details of mid-year progress are set out in Appendix 1. 
4.2 The progress of the Plan’s 21 actions is summarised below: 
Progress No. (%) 
Completed 2 (10%) 
In progress and on track 17 (80%) 
Overdue 1 (5%) 
Cancelled 1 (5%) 
4.3  The overdue action relates to the following, with further details set out in the
appendix: 
ITEM 8
Page 43

Page 44

 Implement second phase of CCTV equipment and infrastructure
modernisation and improvements 
4.5 Twenty-one of the Plan’s 25 PIs are monitored quarterly. Performance is
summarised below. 
Performance Against Target Q1 Q2 
Target met or exceeded 7 7 
Target narrowly missed 5 5 
Target significantly missed  6 5 
Data only PI 2 2 
Not available 1 2 
Total No. of PIs 21 21 
4.6 Significantly missed targets at mid-year relate to the following PIs, with further
details set out in the appendix: 
 % of Youth Homelessness levels in West Dunbartonshire
 The number of incidences of youth homelessness in West Dunbartonshire
is reduced
 % of all homeless cases re-assessed within 12 months (repeat
homelessness)
 Average time taken (in days) to complete medical adaptations 
4.7 Significantly missed targets at mid-year, where improvement was noted in the
second quarter relate to the following PIs, with further details set out in the
appendix:
 % of properties returned from repairs within target
 Average length of time (in hours) taken to complete emergency repairs
 Average time taken (in days) to complete non-emergency repairs 
5 People Implications 
5.1 There are no direct people implications arising from this report. 
6 Financial & Procurement Implications 
6.1 There are no direct financial or procurement implications arising from this
report. 
7 Risk Analysis 
7.1  Failure to deliver on the actions assigned to Housing Services may have a
direct impact on the delivery of the Council’s Strategic Plan. It is essential that
remedial action is taken to ensure strategic delivery plans achieve the
commitments detailed. 
8 Equalities Impact Assessment 
Page 44

Page 45

8.1  Screening and impact assessments will be carried out on specific activities as
required. 
9 Consultation 
9.1  The delivery plans were developed through consultation with officers from the
strategic service areas. 
10 Strategic Assessment 
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council. 
Chief Officer:   Peter Barry
Service Area:   Housing Services
Date:                  23 October 2025
_____________________________________________________________ 
Person to Contact:  Nicola Docherty
Nicola.docherty@west-dunbarton.gov.uk 
Appendices:  Appendix 1: Housing services Delivery Plan 2025/26 -
Mid-year Progress 
Background Papers:        Housing Services Delivery Plan 2025/26 - Housing and
Communities Committee, 7 May 2025  
Strategic Planning & Performance Framework 2022/27   
Wards Affected:               All
Page 45

Page 46

Housing Services Delivery Plan Mid-Year Progress 2025-26 
1. Our communities 
Objective 1. Our neighbourhoods are safe, resilient and inclusive 
Performance
Indicator
Q1 2025/26 Q2 2025/26
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
Number of incidents
directed to Police by
Public Space CCTV
team 
132 100    122 100   Mid-year target exceeded.  Nicola
Pettigrew
% of anti-social
behaviour cases
resolved 
91% 96%    98.2
%
96%  
Mid-year target narrowly missed.
Overall, 569 cases have been
resolved within the first half of the year
with 83% of these being resolved
within 30 days. Whilst the service has
been going through a redesign there
has been staffing vacancies which
may have impacted on performance.
The ASB cases resolved is a complex
calculation and mid-year performance
is indicative of performance to date
and subject to change at year end
once a data validation exercise is
Nicola
Pettigrew
ITEM 8 - APPENDIX 1
Page 46

Page 47

Performance
Indicator
Q1 2025/26 Q2 2025/26
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
carried out, it is anticipated the year-
end target will be met.
% of Public Space
CCTV cameras that
are operational
Not available at mid-year
As the CCTV infrastructure goes
through the modernisation process it
is not possible to have reliable figures
on operational cameras as they are
constantly changing. Testing of
connectivity and problem-solving
technical issues means that camera
performance at this stage is
undeterminable. It is anticipated that
when the system upgrade is
completed in late Autumn, we will be
able to better monitor the performance
of the cameras and report an average
figure at year end. 
Nicola
Pettigrew
Number of breaches
of the Unsuitable
Accommodation
Order 
0 0    0 0   Mid-year target met.  John Kerr 
Action Status Progress Due Date Note Owner
Implement second phase of CCTV
equipment and infrastructure
modernisation and improvements  
30-Sept-
2025
This action is progressing well, during the project some
unforeseen technical challenges caused some delay,
these have now been resolved, and work continues to
the infrastructure modernisation programme. To date
Nicola
Pettigrew
Page 47

Page 48

Action Status Progress Due Date Note Owner
work that has been undertaken in the final stages of the
project includes, Fiber connection at Balloch has now
been approved and is operational, work continues at the
high-rise accommodation, and it is anticipated that within
the coming weeks Dalmuir, Drumry and Kilbowie
buildings will be complete (except for the lifts).  We
continue to work with Kone and have reached
agreement for access to all lift shafts to allow new
cameras in all lifts will be installed, virtually all high rise
cabling is complete and now looking at adding the
camera units to the completed circuits (adding the
cameras is the final part of the task, with the cabling and
connection the time consuming factors). Street cameras
installed; Whitecrook and Craigilea Road are now fully
online and images back to control room. Overall cameras
installed 304 out of 411 - (74% completion) and 60% of
circuits have been installed. 
It is anticipated to be fully completed, and all cameras
live by late Autumn 2025.
Delivery of Housing Solutions
Strategy  
31-Mar-
2026
This action has been successfully completed. The
strategy was signed off Feb 25 HACC and began rolling
out April 2025 and new action plan created to take the
implementation forward.
John Kerr
Develop a refreshed approach to
tenant safety inclusive of Awaabs
law  
31-Mar-
2026
This action is progressing as planned. Awaabs law is
included in the Housing bill which was passed by
Parliament on 20th September.  We have been rolling out
damp and mould sensors which has been addressing
any issues.  Once guidance from the Scottish
government has been given on the timescales and
John Kerr
Page 48

Page 49

Action Status Progress Due Date Note Owner
expected actions, we will refresh our approach to ensure
compliance. 
Objective 2. Our residents health and wellbeing remains a priority 
Performance
Indicator
Q1 2025/26 Q2 2025/26
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
% of Youth
Homelessness levels
in West
Dunbartonshire 
21% 20%    26.6
% 20%  
Mid-year target not met. We have
managed to reduce the levels of
youth homelessness significantly
over recent years and met the
ambitious target set for 2024/25.
Levels of presentations have
increased slightly in Q1 and Q2 of
2025/26 we will continue to monitor
this closely and take any mitigating
actions where appropriate.
John Kerr
Total number of
children in temporary
accommodation 
126 n/a    134 n/a  
We have been using all available
tools to reduce the numbers of
children in our homeless service
including prioritisation of larger family
homes within our buy back schemes.
Our new build programmes have
included high numbers of 4- and 5-
bedroom properties.
John Kerr
Page 49

Page 50

Performance
Indicator
Q1 2025/26 Q2 2025/26
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
However, we have continued to see
high numbers of larger family present
as homeless outweighing the
increased supply. 
Action Status Progress Due Date Note Owner
Develop and introduce a new
preventative focused housing
access system  
31-Mar-
2026
This action is progressing as planned. With the new
proposal due to be discussed at the November Access
to Housing meeting.
John Kerr 
Objective 3. Our residents are supported to increase life and learning skills 
Action Status Progress Due Date Note Owner
Deliver on key objectives of the
Housing Emergency Action Plan  
31-Mar-
2026
This action is progressing well. 50% of the actions are
completed, 27% more than 50% complete, the remainder
have been progressed but several linked to the delivery
of the new housing solutions strategy once vacancies
have been filled.
John Kerr
Housing Solutions Strategy actions
to be implemented  
31-Mar-
2026
This action is progressing as planned and due to be
completed by year end. All Q1 and Q2 actions due in
year one have been completed.
John Kerr 
2. Our Environment
Page 50

Page 51

Objective 6. Our neighbourhoods are sustainable and attractive 
Performance
Indicator
Q1 2025/26 Q2 2025/26
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
Tenancy Sustainment
Levels within Housing
First  100% 90%    100% 90%   Target exceeded at mid-year point.  John Kerr
Average length of
time to re-let
properties  24.44 25    22.7 25   Mid-year target exceeded.  Nicola
Pettigrew
The number of
incidences of youth
homelessness in
West Dunbartonshire
is reduced 
61 58    74 58  
Mid-year target not met at mid-year.
We have managed to reduce the
levels of youth homelessness
significantly over recent years and met
the ambitious target set for 2024/25.
Levels of presentations have
increased slightly in Q1 and Q2 of
2025/26 we will continue to monitor
this closely and take any mitigating
actions where appropriate.
John Kerr
% of all homeless
cases re-assessed
within 12 months
(repeat
homelessness) 
6% 4%   Data not yet available
Quarter one target not met, quarter
two target is not yet available. We will
continue to monitor this closely and
take any mitigating actions where
appropriate.
John Kerr
% of council
dwellings that meet 
73.84
%
73.23
%   
75.6
% 78%   Mid-year target narrowly missed.
Despite this performance has
Alan
Young
Page 51

Page 52

Performance
Indicator
Q1 2025/26 Q2 2025/26
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
the Scottish Housing
Quality Standard
improved from the first quarter and in
the longer term. Work continues to
complete EICR and to increase
compliance, the % Compliance rate
reflects the good progress in EICR
completions. 
Action Status Progress Due Date Note Owner
Ensure the Council’s Housing
stock maintains compliance with
the Scottish Housing Quality
Standard and reduce the number
of properties held in abeyance.  
31-Mar-
2026
This action is progressing well and on track to be
completed at year end. The Capital Investment
programme for 25-26 continues to progress and
contribute to SHQS compliance.
Alan Young
Ensure the Council’s Housing
stock progresses towards the
achievement of the energy
efficiency standard for social
housing (EESSH).  
31-Mar-
2026
This action is progressing well and on track to be
completed at year end. The Capital Investment
programme for 25-26 continues to progress external wall
insulation (EWI) and contribute to EESSH compliance.
Alan Young
Develop and introduce a wider
national rented home strategy 
This action has been cancelled as it was a response to
elements within the Housing Bill, these have now been
removed from the Housing Bill through the parliamentary
process, and this action is no longer required. 
John Kerr
Develop approach to the new
Social Housing Net Zero Standard  
31-Mar-
2026
This action has made some progress however we await
an updated position from Scottish Government on the
new zero social housing standard which we will have to
John Kerr
Page 52

Page 53

Action Status Progress Due Date Note Owner
meet allowing us to draft a net zero strategy for our
housing stock.
Deliver on the More Homes
Programme  
31-Mar-
2026
This action is progressing as planned. To date we have
delivered on the following projects: Clydebank East-12
flats 1 and 2 beds, Mount Pleasant- 3 terraced
bungalows, 4 cottage flats, 12 flats mix of 1 and 2 beds
19, Pappert - houses cottage flats 1 and 2 bedrooms (9)
and 17 family houses 3 and 4 bed. 
In total we have delivered 57 new houses and a further
20 buy backs. 
Over the remaining year we anticipate completion of
Gilmour Avenue and Willox Park delivering a further 19
properties.
John Kerr
Deliver new Housing Asset
Management Strategy  
31-Mar-
2026
We are currently finalising comprehensive assessment
of our housing stock this will then allow our strategy to
be developed. 
John Kerr
Implement digital improvement for
housing operations (mobile app)  
31-Mar-
2026
This action is progressing as planned and anticipated to
be completed by year end. To date we have improved
the functionality of housing functions ensuring managers
have access to more timely data and information. We
have moved functionality of house visits on to the app
and over the remaining year we will focus on progressing
the technology to allow a range of other housing
functions to be available. The development of the mobile
app for housing officers demonstrates our commitment
to continuous improvement.  
Nicola
Pettigrew
Page 53

Page 54

Action Status Progress Due Date Note Owner
Implement digital improvement for
housing operations (self-serve
portal)  
31-Mar-
2026
This action is progressing well and anticipated to
completed by year end. To date we have completed the
automation of the housing application process, and the
focus for the remaining year will be to complete the
transition of other housing functions to the serve service
portal to demonstrate continuous improvement and
demonstrate improved customer experience. 
Nicola
Pettigrew 
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to meet
citizen
expectation and
service
standards
Risk of citizen dissatisfaction
due to us not doing what we say
we will when we say we will or
not completing required works
first time.    
13-Oct-
2025
To ensure citizens expectations
and service standards are met we
have identified key priority areas
within the Building Services
Improvement Plan, where
progress is reported to the
Building Service Board. We will
continue to monitor customer
satisfaction to assess the impact
of the improvements.
Craig
Wilson
Failure to
achieve the
outcomes of the
Scottish Social
Housing Charter
The Scottish Social Housing
Charter sets out the standards
and outcomes that tenants and
customers should expect from
social landlords, in terms of the
quality and value for money of
the services they receive.
Failure to continue to meet
these could place the Council at  
16-Oct-
2025 Assessment remains as previous,
however risk concerns have been
identified and included within the
Councils Annual Assurance
Statement which was submitted
to the Housing Regulator in
October 2025.
John Kerr
Page 54

Page 55

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
risk of the intervention powers of
the Scottish Housing Regulator 
Failure to
deliver on
homelessness
prevention
The risk that, similar to other
Local Authorities we will be
unable to adequately meet
housing needs due to rising
costs and reduction in funding.     
04-Nov-
2025
Assessment upgraded and linked
to the housing emergency
declaration 2024. Key aspect of
housing emergency action plan is
to accelerate homeless
prevention activities in advance of
homeless prevention duties as
noted in the current Housing Bill.
John Kerr
Failure to
maintain
Housing Stock
The risk that Council’s Housing
Stock are not fully fit for purpose
with consequent adverse impact
on our ability to deliver efficient
and effective housing for
Council tenants.  
09-Oct-
2025
No change to risk score,
programme for investment and
upgrades to council housing
continues into 25-26 and a further
five-year programme to 29-30.
Alan Young   
4. Our Council 
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents 
Action Status Progress Due Date Note Owner
Workforce Planning: Develop and
implement wellbeing, employee
engagement, equality and learning
and development plans to enable  
31-Mar-
2026
Work is progressing in this area with the continuation of
the implementation of the Building Services improvement
plan.
Peter Barry
Page 55

Page 56

Action Status Progress Due Date Note Owner
capabilities, improve resilience and
promotion of a diverse workforce
Workforce Planning: Develop and
implement employee life cycle
plans in line with the People First
Strategy to attract and retain the
workforce  
31-Mar-
2026
The service has seen improvement in this area focussing
on improvement for internal career progression to retain
talent and have a talent pipeline for hard to fill roles. Peter Barry
Workforce Planning: Implement
service review process including
role design, use of new technology
and new ways of working to add
resilience, address gaps, and
establish opportunities for
efficiencies  
31-Mar-
2026
The service review within Building Services is now
almost concluded with final roles for phase 3 being
recruited to and this is leading to service improvement
and improved workforce flexibility.  Workforce stability in
Building Services has been achieved with the review of
temporary contracts now concluded.  Work will continue
on reviewing structures across services to improve SOM
compliance and effectiveness.
Peter Barry
Workforce Planning: Develop and
implement learning and
development plans and
development opportunities to
improve capabilities and resilience
within the workforce  
31-Mar-
2026
Work continues in this area with support the
improvement of managers capability and skills set
around people practice and financial responsibilities.
Peter Barry 
Objective 11. Our Council is adaptable and focused on delivering best value for our residents  
Page 56

Page 57

Performance
Indicator
Q1 2024/25 Q2 2024/25
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
% of properties
returned from repairs
within target 
62.1
%
80%    74.6
% 80%  
Mid-year target not met. Despite this
significant improvement has been
made in the second quarter.
Craig Wilson
Average time taken
(in days) to complete
medical adaptations 
68 40    69 40  
Mid-year target not met. Performance
has been affected by completions of
longer standing applications which
have a big effect on the total
average.
Alan Young
Average time (in
days) to inspect and
repair empty homes 
16 12    12 12  
Mid-year target narrowly missed.
Despite this Performance has
improved in the second quarter to
meet target. 
Craig Wilson
Percentage of repairs
appointments kept 
91.3
%
93.6
%    92% 93.6
%  
Mid-year target narrowly missed.
Despite this performance has
improved in the second quarter. 
Craig Wilson
Number of times in
the reporting year did
you not meet your
statutory obligation to
complete a gas safety
check within 12
months of a gas
appliance being fitted
or last checked 
0 0    0 0  
Mid-year target met. This PI replace
the previous measurement of gas
safety checks of % of properties that
require a gas safety record which had
a gas check and record completed by
the anniversary date.
Craig Wilson
Page 57

Page 58

Performance
Indicator
Q1 2024/25 Q2 2024/25
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
Percentage of
reactive repairs
carried out completed
right first time 
99.4
% n/a    99.4
% n/a  
Performance remains strong in both
quarters.
The definition of this indicator was
changed by the Regulator and
applies from April 2025.
The impact will be that performance
will improve for all landlords, but we
have no benchmark to understand
exactly by how much and there
difficult to agree a target.
Craig Wilson
% of tenants satisfied
with the repairs and
maintenance service 
85.8
%
91.8
%   
88.7
%
91.8
%  
Mid-year target narrowly missed;
however, improvement is showing in
the second quarter and both the long
and short term. 
Craig Wilson
Average length of
time (in hours) taken
to complete
emergency repairs 
4.91 4    4.67 4  
Mid-year target not met. Despite this
performance has improved in both
the long term and short term.
Craig Wilson
% of council rent that
was lost due to
houses remaining
empty 
0.56
%
0.85
%    0.9% 0.85
%   Mid-year target met. Nicola
Pettigrew
Average time taken
(in days) to complete   13.55 9.7    11.4
6 9.7  
Mid-year target not met; despite this
performance improvement is showing
in the second quarter and showing
Craig Wilson
Page 58

Page 59

Performance
Indicator
Q1 2024/25 Q2 2024/25
Comments Owner Statu
s Value Targe
t
Short
Trend
Long
Trend
Statu
s Value Targe
t
Short
Trend
Long
Trend
non-emergency
repairs
improvement over the previous two
quarters. 
Action Status Progress Due Date Note Owner
Implement improvement plan for
Building Services – year 4  
31-Mar-
2026
This action is progressing well. To date we have
identified key priorities and developed an action plan for
the coming year, this was approved at the Building
Services Board where progress will be regularly updated.
We have carried out a review of service delivery and will
seek approval at Strategic Renewal and Review Group
(SRRG) in October '24 and report outcomes to Housing
and Communities Committee (HACC). Over the
remaining year we will undertake a job evaluation
exercise appropriate to service needs.
Craig
Wilson
Externalise reroofing programme   31-Mar-
2026
This action is progressing as planned. The procurement
exercise for the new contractor was carried out with
committee approval granted in August. Initial
consultation work has been carried out regarding the
TUPE arrangements of staff; it is anticipated this will be
fully complete by 27th October 2025. 
Craig
Wilson
Reduce the actual days taken to
Bring Back to Relet Standard
(BRS) a void property.  
31-Mar-
2026
This action has been successfully completed. Work has
been done to improve productivity around management
of void properties. In the first half of the year we have
seen a reduction in days taken as a result of targeted
action. We will continue over the rest of this year to
ensure continued success. 
Craig
Wilson
Page 59

Page 60

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to
implement
IHMS system
across building
services
The effective implementation of
the IHMS system will delivery
efficiency, improve case
tracking, capture customer
satisfaction and improve service
delivery.  
13-Oct-
2025
IHMS has been fully implemented
within Building Services. Almost
all of building services operatives
are using the technology
associated with IHMS and are
continually trained as we continue
to add further functionality to the
system. 
Craig
Wilson 
PI Status 
Target significantly missed 
Target narrowly missed 
Target met or exceeded 
Data only PI 
Risk Status 
Alert 
Warning 
OK 
Long Term Trends 
Improving 
No change 
Declining 
Action Status 
Overdue 
Not on track 
In Progress and on track 
Completed 
Cancelled
Short Term Trends 
Improving 
No change 
Declining 
Page 60

Page 61

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 19 November 2025
___________________________________________________________________
Subject:     West Dunbartonshire Housing Emergency Declaration Action Plan
1. Purpose
1.1 The purpose of this report is to provide members with an update on the Housing
Emergency Action Plan (HEDAP) which was formulated to address the emergency
following the Council’s housing emergency declaration on 1st May 2024. The report
also aligns the HEDAP to the recently published Scottish Government Housing
Emergency Action Plan and the opportunities this can present within a local
housing and homelessness context.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the progress to date and the implementation of the key actions of the
Housing Emergency Declaration Action Plan as summarised in section 4.1
– 4.10 of this report and in the action plan update within Appendix 1 of this
report;
(ii) Note another West Dunbartonshire Housing Emergency summit will be
hosted by the Council on 2nd February 2026;
(iii) Note the Scottish Governments response to the national emergency in
sections 4.11-4.12 of this report and what it means for West
Dunbartonshire Council’s housing and homelessness services
summarised in sections 4.13-4.18 of this report.
(iv) Note the Housing Bill has now been passed through Parliament on 30th
September 2025 and note the future increased statutory requirements on
the Council’s housing and homelessness services.
(v) Note the Chief Officer, Housing will continue to bring an update report on
the HEDAP to future Housing and Communities committee meetings.
3. Background
3.1 On the 1st of May 2024 Housing and Communities Committee unanimously agreed
to declare a Housing Emergency in West Dunbartonshire Council (WDC). The
reasons behind the motion being raised was due to the extreme pressures facing
housing and homelessness services in WDC.
Page 61
ITEM 9

Page 62

3.2 This was despite positive achievements of the service to help manage the acute
housing need in West Dunbartonshire including the following:
 262 households prevented from experiencing homelessness,
 Progress in reducing the number of empty homes (council voids); and
 The construction of new council homes at the following development sites
Clydebank East, Mount Pleasant, Pappert and Gilmour Avenue.
3.3 Despite this, housing demand increased rather than the expected reduction and
therefore the following metrics highlighted the pressures on the housing and
homelessness systems within West Dunbartonshire prior to the housing
emergency declaration.
 Over five thousand on the Council’s housing waiting lists,
 274 households in temporary accommodation awaiting an offer of
permanent housing, of those eighty-nine households have children within
them, and
 the anticipation of more than one thousand new homeless assessments to
be made during the 2024/25 reporting period.
3.4 As reported previously to the Housing and Communities Committee, the Council
had been unable to fulfil all our statutory duties under homelessness legislation
and has incurred sixty-eight breaches of the Unsuitable Accommodation Order
(UAO) following 274 households being placed in Bed & Breakfast Accommodation
during 2023/24.
3.5 The increased supply of new social homes is the key element to help address the
demand pressures, The funding cut to the wider Affordable Housing Supply
Programme funding of around 24% in 2024/25, significantly contributed to the
Housing Emergency Declaration.
3.6 West Dunbartonshire Council were the fifth local authority to declare a housing
emergency following declarations made in Argyll and Bute, Edinburgh, Glasgow,
and Fife. Since the West Dunbartonshire declaration, a further eight local
authorities have followed suit and made a housing emergency declaration (South
Lanarkshire, West Lothian, Angus, Scottish Borders, Dumfries and Galloway,
Aberdeen, East Renfrewshire and East Lothian). Therefore 13 of 32 Scottish local
authorities have declared housing emergencies, including four of the six housing
stock transfer authorities.
3.6 Significantly on the 15th of May 2024, the Scottish Government declared a
National Housing Emergency in the Scottish Parliament. More recently, the
Scottish Government also launched their housing emergency action plan in
September 2025.
4. Main Issues
4.1 The action plan has four main themes they are as follows:
 Theme 1 - Deliver and maintain More Homes - West Dunbartonshire
approach to the delivery of affordable housing,
 Theme 2 - Make Best Use of Existing Stock,
Page 62

Page 63

 Theme 3 - Enhancing Housing Access and the prevention of
homelessness, and
 Theme 4 - Strengthen the Financial viability and capacity of the
Housing Revenue Account and associated Housing and
Homelessness budgets.
4.2 The Housing Emergency Project Board (HEPB) continues to meet monthly
basis since the housing emergency declaration led by the Chief Officer,
Housing.  The HEPB agreed further progress will be made via existing
governance arrangements such as Housing Improvement Board, More Homes
Project Board and Better Homes Project Board and reported to the overarching
Housing Emergency Project Board. 
Following the Housing Summit which attracted eighty stakeholder held on 10th
February 2025 with an aim to work on solutions to help end the housing
emergency and also improve housing options longer term within West
Dunbartonshire. This successful event with purposeful and enthusiastic
conversation taking place prompted the addition of a further seven strategic
actions to the HEDAP.  The HEPB also agreed following positive feedback from
the stakeholder participants to host another housing emergency summit in
February 2026. This date is now confirmed as Monday 2nd February 2026 and
preparations have commenced.
4.4 There are now a total of 68 actions within the plan. Of which 34 are now fully
complete with another 18 actions more than 50% complete.
4.5 A full progress report is attached as Appendix 1 of this report and some highlights
are summarised in the sections below: - 
Deliver and maintain More Homes - West Dunbartonshire approach to the
delivery of affordable housing
4.6 The Housing and Communities Committee Convenor wrote to the Housing
Minister requesting the reinstatement of the funding cut to the Affordable
Housing Supply Programme funding.  Our funding for the Affordable Housing
Supply Programme has been reinstated.  The Council supported by tenant
prioritisation has continued to deliver much needed new homes.  In 2025/26 the
Council has overseen the completion of 88 new homes at Clydebank East, 19
new homes at Mount Pleasant and 26 new homes at Pappert. Gilmour Avenue
and Willox Park Phase 1 will also complete in 2025/26 adding a further 19 new
homes to meet demand. The delivery of these new homes is supported by The
Council’s buyback scheme addressing housing need in West Dunbartonshire
with a particular focus on larger family homes, 21 buybacks year to date in
2025/26 with a further 6 currently under offer.  The planning review is now at
national level which West Dunbartonshire Council fed into and welcome the
outcome.
Make Best Use of Existing Stock
4.7 There has been positive progress around void performance within the Council’s
housing stock with voids been reduced to 150 at year end and reduced slightly
further in 2025/26.  The new repairs policy is being monitored since its rollout
Page 63

Page 64

in April 2025.  Progress has been made on the review of supported
accommodation. A new campaign drive along with additional actions to help
promote and maximise the use of Homeswapper (mutual exchange scheme) to
further meet housing need.    The new empty homes strategy has brought 15
homes back into use year to date in 25/26, two of which have brought back into
use as council homes.  Our damp and mould environmental sensor project
continues to roll out across our housing stock and the review of our leased
properties will be completed before the end of 2025.
Enhancing Housing Access and the prevention of homelessness
4.8 Continued monitoring of the refreshed approach to assist with preventing
negative housing situations including a refreshed housing pathway for WDC
tenants who flee domestic violence.  Actions in the new Housing Solutions
Strategy are being taken forward.  The transfer led allocations approach for new
builds continues to be implemented and we’ll review the outcomes of this at the
end of the year but already we are tracking a number of households and
children being taken out of homelessness.  There has also been significant
progress made around a public awareness campaign on homelessness.  The
shared common online housing application form was launched in October with
ongoing discussions and possible next stages leading to a West
Dunbartonshire Common Housing Register.
Strengthen the Financial viability and capacity of the Housing Revenue Account
(HRA) and associated Housing and Homelessness budgets
4.9 Several actions continue to be taken forward through the Housing Emergency
Project Board and the HRA Value for Money group which now meets on a
weekly basis to help strengthen the financial health of the Housing Revenue
Account.  Council Officers are also continuing to be part of a national
conversation with the Scottish Government, COSLA (Convention of Scottish
Local Authorities) and ALACHO (Association of Chief Housing Officers) to
investigate the possibility of HRA debt relief to enable local authorities to build
or acquire additional social rented homes following the recommendation within
the Housing Investment Taskforce report published in 2025.  A decision on this
continues to be outstanding from the United Kingdom Government.   A review
of building services has taken place with several actions being taken into
2025/26 to be fully complete.
4.10 Key performance indicators continue to be monitored to help show the progress
made through the action plan which will signify an end to the current emergency
declaration. 
Scottish Governments Response to National Housing Emergency
4.11 The Cabinet Secretary for Housing announced the Scottish Government’s
response to the national housing emergency declaration in May 2024 to the
Scottish Parliament in September 2025, the response in the form of an action
plan has three key pillars to meet the required objectives;
Page 64

Page 65

1. Ending children living in unsuitable accommodation
2. Supporting the housing needs of vulnerable communities
3. Building our future - maximising investment in Scotland’s housing
sector
4.12 The plan lists actions that will be taken by the Scottish Government, the key
actions are highlighted below under each of the three pillars;
Ending children living in unsuitable accommodation
 Doubled the acquisition funding to £80m in 2025/26 (West
Dunbartonshire Council has been notified of an additional £333k); 
 Asking councils to flip temporary tenancies into permanent tenancies;
 The introduction of Awaab’s law through the Housing Bill to come into
force by March 2026;
 Introduction of rent controls in the private rented sector;
 Fund pilot schemes such as private sector leasing schemes to reduce
use of bed & breakfasts and other unsuitable accommodation, and
 Invest an additional £2 million into discretionary housing payments to
help those move from temporary accommodation.
Supporting the housing needs of vulnerable communities
 Establish a £1 million national fund for survivors of domestic abuse to
leave a partner; 
 Invest in geographically targeted housing first expansion working with
RSLs to purchase properties for housing first tenancies, and
 Additional £1million housing first uplift to this year’s Rapid rehousing
funding taking it to £9 million through the committed £8 million for
2026/27 to meet key agreed aims
Building our Future
 The Scottish Government has committed to a £4.9bn of investment
over the next four years in the delivery of new homes, this will see the
introduction of multiyear funding allocation to strengthen the delivery of
strategic housing investment plans;
 New Social Homes: The plan targets the delivery of 25,000 new social
rent homes by 2030;
 Introduce a new all tenure delivery ambition to increase delivery of new
homes by 10% in each of the next three years;
 Housing will continue to be the key focus for the Scottish National
Investment Bank
What this means for West Dunbartonshire
4.13 The announcements made by the Cabinet Secretary for Housing were
received well by the housing and local authority sectors.  For West
Dunbartonshire Council, this national intervention provides an opportunity to
exit our own housing emergency at a greater pace. While the prospect of
enhanced resources should support the expansion of our Affordable Housing
Programme and enable delivery of much-needed new homes at pace, the
Council must also ensure alignment with evolving national housing priorities
Page 65

Page 66

and demonstrate capacity to secure and deploy any additional funding
effectively. Once the Scottish Government makes formal announcements on
the aspects of the Action Plan, such as funding and how this will be distributed
to local authorities, the Council will review its current housing investment
programmes in light of these, with a focus on maximising investment
opportunities and ensuring the delivery of affordable housing continues to
meet the needs of West Dunbartonshire’s communities.
4.14 The Council, both at political and officer levels have called for fairer funding
distribution of housing and homelessness funding and this will need to
continue.  The recent additional allocation of £333k to support our acquisition
programme while welcomed, the distribution funding formula used is heavily
weighted to the larger local authorities.
4.15 The Council has well established acquisition (buybacks) and conversion
(flipping) programmes in place therefore the additional funds allocated will be
fully utilised.  The Council has also been pioneering in rolling out a damp and
mould sensor programme which will assist with new duties coming into force
in March 2026 under Awaab’s Law element of the forthcoming Housing Act.
4.16 The commitment for a further year of rapid rehousing transition funding with
the additional financial support to assist with the delivery of Housing First will
support the objectives being delivered through the Housing Solutions
Strategy. It is unknown where the Scottish Government intend to target the
additional capital housing first funding to enable an expansion with RSL
purchasing properties to provide housing first tenancies, however we
anticipate that this will be in local authority areas where the local authority
does not manage a housing portfolio.
4.17 We will require to review whether re-establishing a private leasing scheme in
West Dunbartonshire is required if funds are made available.  Planning
services will take forward any recommendations from the National Planning
review once this has completed. At present West Dunbartonshire Council is
not considering taking a report to introduce rent controls within the private
sector however, monitoring will need to be introduced meaning additional
resources to keep this under review maybe required once guidance has been
issued.
4.18 Several of the actions were included within the new Housing Bill, which was
passed by parliament on 30th September, and we now await Royal Assent and
further guidance.  The wider implications for the West Dunbartonshire Council
will be included in a future report to the Housing and Communities Committee
in February 2026.
5. People Implications
5.1 Initial analysis of the action plan does not indicate any implications for people.
However, many of the actions involved are additional tasks not within current
remits therefore may lead to additional staffing resources. The new legislative
duties are likely to require additional staffing resources where approval at futures
committees if required would be requested. 
Page 66

Page 67

6. Financial and Procurement Implications
6.1 The Housing Emergency Declaration Action Plan (HEDAP) will need to be
considered within the context existing resources available to West
Dunbartonshire Council across both the General Fund and Housing Revenue
Account (HRA). There is currently no additional Grant or Subsidy funding
available to Councils because of declaring a Housing Emergency.
6.2 The Housing Emergency Project Board will consider how existing resources
can be utilised to ensure delivery of the HEDAP. This will include a review of
Core Budgets and any Temporary Funding Sources which may be utilised.
6.3 The additional allocation to West Dunbartonshire Council of acquisition funding
of £333k will be drawn down from the Affordable Housing Supply Programme
funding in 2025/26, the allocation will further support the Council’s buyback
scheme and will focus on moving children out of a homeless environment into
permanent accommodation.
6.4 There are no procurement implications to note.
7. Risk Analysis
7.1 Regular breaches of statutory homelessness duties partly triggered the
declaration of the Housing Emergency, and it is highly probable these will
continue without focussed, cross Council and Partnership action led through
the Housing Emergency Project Board.
7.2 The Council is also likely to experience significant legal, regulatory, and
reputational risk due to shortages of housing supply and related services.
Mitigation of these risks are included within the HEDAP, and these will be
managed through the Housing Emergency Project Board.
7.3 Housing supply continues to be the key factor in terms of the national and local
housing emergencies and if not increased and demand reduced it will lead to
continued pressures on temporary accommodation and ultimately Bed &
breakfast use which has negative financial implications for the Council’s general
fund. 
8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 An EIA has been carried out and there are no negative equalities impacts due to
this update.  A separate EIA screening will be conducted for any policy changes
because of the implementation of the HEDAP.
10. Consultation
Page 67

Page 68

10.1 The Housing Emergency Declaration Action Plan (HEDAP) was consulted with
a range of key stakeholders including the West Dunbartonshire Tenants and
Residents Organisation. The implementation of the HEDAP is predicated on a
consultative and collaborative focus and several key stakeholders are
represented on the Housing Emergency Project Board.
11. Strategic Assessment
11.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities.
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive & Adaptable
Peter Barry
Chief Officer, Housing and Employability
Date: 5th November 2025
___________________________________________________________________
Person/s to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Claire McKay – Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing
and Employability, email: Claire.Mckay@west-
dunbarton.gov.uk                                                                                              
Appendices: 1. Housing Emergency Action Plan, October
Background Papers:   Housing Emergency Declaration, Housing and Communities
Committee, May 2024
Tackling Scotland’s Housing Emergency, Scottish
Government, September 2025 Supporting documents -
Tackling Scotland's Housing Emergency - gov.scot
Wards Affected:             All    
Page 68

Page 69

Housing Emergency Declaration action plan 
Generated on: 27 October 2025
Report Layout: Housing Scorecard with Action and PI codes   
Icon Name  
1 - Deliver and maintain More Homes - West Dunbartonshire approach to the delivery of affordable housing. 
Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
H/HEDAP/2024/001
Continue to lobby SG
for increase in AHSP
funding in partnership
with
COSLA/SOLACE/ALAC
HO  
31-Mar-
2025
Issue letter to the housing minister
highlight the Housing Emergency
declaration and requesting that the full
AHSP is restored.
30-Aug-2024 Yes
John Kerr  
Highlight within SHIP and Programming
Process the impacts of cuts to the AHSP
31-Oct-2024 Yes  
Participate in a number of Member and
Officer groups and influence agenda to
maximise AHSP budget settlement
31-Mar-2025 Yes  
Review impact of discussions with Scottish
Government
31-Mar-2025 Yes  
H/HEDAP/2024/002
Refresh Strategic
Housing Investment
Plan to ensure the
delivery of new homes
to meet acute housing
need in West
Dunbartonshire  
29-Nov-
2024
Presentation to West Dunbartonshire
Strategic Housing Providers Forum
30-Aug-2024 Yes
John Kerr  
Carry out prioritisation exercise 21-Oct-2024 Yes  
Draft SHIP approved by More Homes
Project Board
31-Oct-2024 Yes  
H/HEDAP/2024/003
Deliver new Strategic
Housing Investment
Plan  
31-Oct-
2024       Jamie Dockery  
H/HEDAP/2024/004
Deliver the Council's
approved new build
programme for 24/25  
01-Mar-
2025       Dawn Conner
ITEM 9 - APPENDIX 1
Page 69

Page 70

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
helping meet the
identified housing
need.  
H/HEDAP/2024/005
Examine ways to
accelerate new build
delivery considering
housing emergency
declaration  
31-Dec-
2024
SHIP to be prepared and draft submitted
to the Scottish Government by October 31
31-Oct-2024 Yes
John Kerr  
Develop and acquire More Homes Project
Board approval for proposal to ensure the
acceleration and prioritisation of new
home delivery.
31-Dec-2024 Yes  
Develop revised Strategic Local
Programme in partnership with Scottish
Government  
Yes  
H/HEDAP/2024/006
Scale up and extend
the Buy Back Scheme
to meet the key
housing demand
factors including the
provision of temporary
accommodation  
31-Mar-
2025
Year-end total buybacks 31-Mar-2025 Yes
Laura Hanna  
17 buy backs completed so far, this
financial year 
(11 Larger properties 3 bed + & 6 non-
larger 1 & 2 beds) 
We have a further 8 under offer awaiting
completion 
(2 Larger properties 3 bed + & 6 non-
larger 1 & 2 beds)  
Yes  
We have completed 13 buy backs so far in
this financial year, with another 9
properties under offer, awaiting
completion. 7 of these properties have
been let so far, with 4 of the lets going to
homeless applicants.  
Yes  
H/HEDAP/2024/007
Explore innovative
housing investment
and partnership
models to maximise
housing investment
approaches  
31-Dec-
2025
Participate in Housing Investment task
force discussions
25-Sep-2024 Yes
John Kerr  
Continue to develop own proposals in
partnership with external agencies and
potential investors
31-Mar-2025 Yes  
Proposal paper to More Homes Project
Board r to define policy
31-Dec-2025 No  
H/HEDAP/2024/008 In
partnership with the
Scottish Government
review the planning  
28-Feb-
2025
actions from the meeting - attended by
chief planning officer
28-Feb-2025 Yes
Peter Barry; Alan Douglas; Michael
Mulgrew
Page 70

Page 71

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
and consenting system
considering the
national housing
emergency to increase
the scale and pace of
development across all
tenures  
H/HEDAP/2024/009
Review HRA resource
allocation across the
Council to help
facilitate/deliver new
build programme  
30-Jan-
2026
Detail development priorities within SHIP 31-Oct-2024 Yes
John Kerr  
Housing Development Service design to be
completed
30-Sep-2025 Yes  
Once new co-ordinator in place - will bring
forward any actions to help increase the
new build programme
31-Dec-2025 No  
H/HEDAP/2024/010
Explore an approach
to develop modular
and other forms of
innovative housing by
working in partnership
with other housing
providers  
31-Dec-
2025
Approval for Gilmour Avenue modular
development
25-Sep-2024 Yes
John Kerr  
Develop revised approach based on review
and share with development partners
31-Dec-2024 Yes  
Review Gilmour Avenue development 30-Nov-2025 No  
H/HEDAP/2024/011
Examine the capacity
of the HRA to deliver
agreed housing
ambitions  
29-Aug-
2025
review for 2024/25 31-Mar-2025 Yes
Peter Barry  
H/HEDAP/2024/012
Engage with public
and private sector
landowners to increase
the HRA landbank and
support development
in line with the
refreshed Strategic
Housing Investment
Plan  
31-Dec-
2025
Participation in Scottish Government trawl
process
30-Sep-2024 Yes
John Kerr  
Special More Homes Board scheduled for
November to look at the opportunities
with other service departments (now
Housing Summitt).
28-Feb-2025 Yes  
Plan agreed at More Homes Board to
inform delivery plans from 2025/26
30-Nov-2025 No  
H/HEDAP/2024/013
Review Affordable
Housing Design
Standard  
31-Mar-
2026       John Kerr
Page 71

Page 72

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
H/HEDAP/2024/014
Increase provision of
Mid-Market Rent
properties as a viable
housing option for
homeless and housing
applicants  
30-Apr-
2026       John Kerr  
H/HEDAP/2024/062
Refresh Housing
Needs and Demand
Assessment (HNDA)
within a local WDC
perspective  
31-Mar-
2026       John Kerr; Claire McKay  
H/HEDAP/2024/063
Carry out a review of
design standards
(Housing development
and planning)  
31-Mar-
2026       Jamie Dockery; Michael Mulgrew 
Icon Name  
2 - Make Best Use of Existing Stock 
Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
H/HEDAP/2024/015
Continue to Improve
our approach to empty
council homes with a
strengthened focus on
reducing void time and
letting longer term
empty homes and
negating any use of
unsuitable
accommodation.  
31-Dec-
2024       Craig Wilson  
H/HEDAP/2024/016
Consider a fixed term
moratorium on non-
essential housing  
20-Dec-
2024
Implement and monitor measures to
improve the control and generation of
non-essential repairs.
30-Aug-2024 Yes
Craig Wilson  
Based on performance and progress made 27-Sep-2024 Yes
Page 72

Page 73

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
repairs to focus
activity around bring
empty homes back
into use
on reducing the number of empty homes
agree to continue to monitor and postpone
any decision on a fixed term moratorium.  
Continue to implement improvement
actions in the void management
improvement plan including increasing
productivity and reducing the average cost
to bring an empty home back to the
Councils' relet standard.
29-Nov-2024 Yes  
Review evidence to make final decision on
a 3-month (last quarter of 2024/2025)
moratorium on non-essential housing
repairs to focus resources on the repair of
the Councils' housing properties.
13-Dec-2024 Yes  
H/HEDAP/2024/017
Develop a process
including exploring
potential partnering
arrangements to
address lengthy delays
by energy suppliers in
the reletting process.  
31-Dec-
2025
Complete review of
referral/communication processes
between void team and Helptomove
30-Sep-2024 Yes
Nicola Pettigrew  
Engage with Consumer Scotland to discuss
problems encountered and provide case
studies to support national focus on
holding energy companies accountable to
resolve meter issues more efficiently
30-Sep-2024 Yes  
Introduce new report from help the move
to identify move ins with no end date
meter readings to enable more accurate
billing information
30-Sep-2024 Yes  
Introduce weekly monitoring report for
support worker to track progress of
complex meter issues and update to
teams
30-Sep-2024 Yes  
Review liaison arrangements with
Helpthemove ensuring appropriate
representation to input to operational
challenges
30-Sep-2024 Yes  
Develop escalation process with
helpthemove on more problematic meter
problems
31-Oct-2024 Yes  
Explore other providers to establish if can
provide additional support to helpthemove  
Yes
Page 73

Page 74

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
arrangements  
H/HEDAP/2024/018
Accelerate the
reduction of private
sector empty homes
by delivering a new
Long Term Empty
Homes Strategy  
31-Mar-
2025
Seek HACC approval of new strategy - aim
to bring 25 properties per year back into
use
30-Nov-2024 Yes
Karen Rae   Review numbers of empty homes brough
back into use at end of current financial
year
31-Mar-2025 Yes  
H/HEDAP/2024/019
Deliver with tenant
representatives a new
repairs policy  
30-Nov-
2024
Carry put early consultation with tenants
to inform revised Repairs Policy and
ensure tenant priorities are delivered.
30-Jun-2024 Yes
Stefan Kristmanns  
HRA Value for Money Group to develop
revised Repairs Policy which will meets
tenant priorities and reflects input from
key stakeholders.
31-Aug-2024 Yes  
Seek approval for revised Repairs Policy
from Housing and Communities
Committee November 2024.
20-Nov-2024 Yes  
H/HEDAP/2024/020
Ensure new repairs
policy achieves key
objectives  
30-Nov-
2024       Craig Wilson  
H/HEDAP/2024/021
Review and promote
Allocations Policy
flexibilities and
enhanced Transfer
Incentive Scheme
linked to the review of
the Housing
Allocations approach  
31-Mar-
2025
Review and agree the new 70% allocation
to transfer applicants for all new builds
30-Aug-2024 Yes
Claire McKay  
new media/drive for downsizing etc 16-Feb-2025 Yes  
Review current transfer incentive scheme 28-Feb-2025 Yes  
H/HEDAP/2024/022
Actively introduce a
pre letting process
initially linked to the
transfer led allocation
process for new build
social housing  
31-Dec-
2025
Introduce notification to Repair and
Maintenance Manager on voids properties
due for return on back of transfer move in
advance of sign-up
30-Sep-2024 Yes
Nicola Pettigrew  
Introduce robust pre-allocation house
assessments process which embeds
ongoing discussions with Building Services
to highlight condition of voids and
30-Sep-2024 Yes
Page 74

Page 75

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
recharges as required  
Introduced homeless liaison meetings in
advance handover dates to identify
existing WDC tenants with open homeless
case
30-Sep-2024 Yes  
Prepare lettings initiative action plan 30-Sep-2024 Yes  
Identify properties for each quota and
engage with relevant teams to finalise
31-Oct-2024 Yes  
Review house assessment form to ensure
capturing relevant information via HO
mobile app
31-Dec-2025 No  
H/HEDAP/2024/023
Deliver the
recommendations
from the Supported
Housing Review  
31-Mar-
2026
Project board to agree options for HACC
following all feasibility studies and
financial reviews 
Linked to action H/RRTP/19-24/064
31-Mar-2025 Yes
Claire McKay  
HACC approval on options 30-Nov-2025 No  
Carry out procurement exercise to meet
new needs and options agreed
30-Jan-2026 No  
H/HEDAP/2024/024
Carry out a
comprehensive
assessment of our
housing stock to
ensure it can deliver
the key priorities
within the Local
Housing Strategy  
31-May-
2026
Establish project plan and resource
requirement
30-Nov-2024 Yes
Jackie McRory  
Stock assessment to be undertaken
against key technical and operational
indicators to assess performance
31-Dec-2025 No  
Initial Report findings to be presented and
recommendations agreed at Better Homes
Project Board
28-Feb-2026 No  
Finding to inform refreshed Housing Asset
Management Strategy which will be
presented to August Housing and
Communities Committee
07-May-2026 No  
Implementation Plan including the focused
regeneration initiatives to be led by
Housing Development Co-ordinator (Better
Homes)
31-May-2026 No  
H/HEDAP/2024/025
Continue to roll out
our approach to  
31-Mar-
2025
1000 Homes 31-Oct-2024 Yes
Emily Dorrian   2000 homes 31-Mar-2025 Yes
Page 75

Page 76

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
address condensation,
dampness and mould
within our homes
through the use of
smart technology that
strengthens housing
management  
H/HEDAP/2024/026
Deliver new proactive
approach to ensure
our housing stock
continues to meet all
statutory compliance
requirements  
31-Dec-
2025
Initial Proposal developed 18-Oct-2024 Yes
John Kerr  
The initial introduction of 2 new
compliance roles to be managed within
the housing service and dedicated to HRA
properties (phase 1)
28-Feb-2025 Yes  
Review of planned approach with tenant
representatives and paper to be submitted
to Better Homes Board in April regarding a
potential Phase 2 to ensure compliance
requirements are met
30-Sep-2025 Yes  
Implementation of Phase 1 31-Dec-2025 No  
H/HEDAP/2024/027
Maximise use of Home
Swapper to meet
rehousing need of
transfer applicants  
31-Oct-
2025
Obtain baseline data to support VFM in
promoting mutual exchange options with
applicants
30-Sep-2024 Yes
Nicola Pettigrew  
Review functionality and best practice with
HomeSwapper
30-Sep-2024 Yes  
Introduce quarterly marketing information
via social media, tenants’ news to
maximise awareness
28-Feb-2025 Yes  
Complete marketing awareness campaign
to increase use of homeswapper
31-Mar-2025 Yes  
Add link to online housing application form
to direct to home swapper and increase
uptake
30-Apr-2025 Yes  
targeted campaign - news article
highlighting how easy 
text transfer applicants with no housing
need 
access Facebook groups to link with
homeswapper
31-May-2025 Yes  
Identify additional resource required to 31-Oct-2025 No
Page 76

Page 77

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
support home swapper back admin
functions required  
Review VFM annual costing of home
swapper and consider if in-house platform
could be developed (similar to rent
insights approach)
31-Oct-2025 No  
H/HEDAP/2024/028
Review of all current
lease agreements
within context of
housing emergency
(e.g., Safe as Houses
scatter flats and
impact on generating
homelessness)  
31-Dec-
2025
Gather all information on all leases for an
overview
30-Nov-2024 Yes
John Kerr  
Review all leases and decide whether best
use of housing stock
31-Jul-2025 Yes  
begin consultation/actions to end any
leases we no longer think appropriate -
report to HIB
28-Nov-2025 No  
H/HEDAP/2024/029
Deliver housing Capital
Investment
Programme to ensure
all homes meet the
Scottish Housing
Quality Standard  
31-Mar-
2025       Alan Young  
H/HEDAP/2024/030
Maximise the use of
existing housing
systems to support
effective stock
management  
31-Mar-
2026       Graham Watters  
H/HEDAP/2024/064
Explore establishing a
common downsizing
WDC wide scheme and
a mutual exchange
site  
31-Mar-
2026
Agree baseline principles in terms of the
scheme
31-Oct-2025 Yes
Claire McKay  
Explore options for a common mutual
exchange WDC wide scheme
31-Mar-2026 No  
Explore options of a common downsizing
scheme for social landlords in west
Dunbartonshire
31-Mar-2026 No  
Explore requirements of a dedicated
resource to facilitate increased numbers if
downsizers and mutual exchanges
31-Mar-2026 No 
Page 77

Page 78

Icon Name  
3: Enhancing housing access & prevention of homelessness 
Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
H/HEADP/2024/065
Carry out a
communications audit
to ensure tenants and
services fully informed
on housing availability
in WDC  
31-Mar-
2026
Review current information on different
platforms
31-Oct-2025 Yes
Claire McKay  
explore option of stock and turnover tool
being added to the public
30-Nov-2025 No  
create a briefing and offer to attend
services team meetings to discuss housing
in WDC
31-Mar-2026 No  
H/HEDAP/2024/031
Develop and
implement transfer led
approach to new build
housing allocations  
31-Aug-
2024
Committee Approval in place and ensure
ongoing tenant support
30-Aug-2024 Yes
John Kerr  
H/HEDAP/2024/032
Strengthen strategic
leadership approach
with HSCP regarding
housing emergency  
30-Jun-
2025
Set up meeting with all senior
management from both HSCP and
Housing/Homeless to take forward
discussions
29-Nov-2024 Yes
Peter Barry; Margaret-Jane Cardno  
Follow up actions from joint meeting 25-Apr-2025 Yes  
H/HEDAP/2024/033
Establish a Task Force
approach to engage
public bodies to
promote prevention
measures linked to the
Housing (Scotland) Bill  
31-Dec-
2025
set up new meeting of the housing bill
group now Bill is through stage 1
30-Oct-2024 Yes
John Kerr   Discuss options for task force - link to
timeline for the bill
29-Nov-2024 Yes  
Develop West Dunbartonshire approach 30-Nov-2025 No  
H/HEDAP/2024/034
Develop a new
refreshed strategic
approach to the
prevention of
homelessness through
the delivery of a
Housing Solutions
Strategy  
01-Apr-
2025
Finalise draft of strategy following
consultation (Aug until Dec)
31-Dec-2024 Yes
Claire McKay  
Seek HACC approval of new strategy 28-Feb-2025 Yes  
Embed and deliver new strategy 01-Apr-2025 Yes  
H/HEDAP/2024/035 In   31-Dec- VAWG partnership supportive of action 30-Nov-2024 Yes Claire McKay
Page 78

Page 79

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
partnership with
Violence Against
Women Partnership
deliver a refreshed
focus on preventing
negative housing
situations as a result
of domestic abuse.
2024 H/HEDAP/2024/038 but will be carrying
out a self-assessment of the group where
Prevention will be a key element  
deliver action H/HEDAP/2024/038 31-Dec-2024 Yes  
H/HEDAP/2024/035a
Full implement the
introduction of the
Housing Solutions
Service following on
from the
Homelessness Service
redesign  
31-Dec-
2025
Job evaluation 28-Nov-2025 No
Joanne Sutherland  
Direct Matches & Matching Pools and
Expressions of Interest
19-Dec-2025 No  
Service Rebranding Action List 31-Dec-2025 No  
H/HEDAP/2024/036 In
partnership with local
RSLs develop and
implement a common
application form for all
social housing
providers in West
Dunbartonshire as part
of the development of
a Common Housing
Register  
17-Oct-
2025
Agree in principle online form and tweak
to ensure all aspects covered
30-Sep-2024 Yes
Claire McKay  
RSL to seek Committee approval on form
before being finalised
30-Nov-2024 Yes  
Agree data sharing agreement and
Information to be used on the website for
all involved and link
13-Jun-2025 Yes  
Agree Launch online form 01-Oct-2025 Yes  
H/HEDAP/2024/037
Introduce a
comprehensive
housing options
interviews at
application stage to
manage demand and
options  
31-Dec-
2025
this is linked to Action 48 being achieved
first
31-Oct-2024 Yes
Joanne Sutherland  
Delivery of stock sheet training and Team
Leader Support/shadowing in interviews.
28-Feb-2025 Yes  
Development and trial of Housing
Solutions paperwork and personal housing
plan.
28-Feb-2025 Yes  
Completion to module 6 housing options
toolkit for all casework staff
18-Aug-2025 Yes  
Review process once new structure in
place
28-Nov-2025 No  
Housing Options Survey and presentation   Yes
Page 79

Page 80

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
to all casework staff  
H/HEDAP/2024/038
Review remit of
Housing Allocations
Panel to reflect a
homelessness
prevention perspective
(domestic, at risk,
others that would
otherwise present)  
31-Jan-
2025
Decision paper for Housing Improvement
Board to agree the extent of the review
31-Aug-2024 Yes
Claire McKay  
meeting of Co-ordinators to agree the
remit
30-Sep-2024 Yes  
new paper to HIB agreeing new proposals
of the remit
31-Dec-2024 Yes  
update guidance and relevant policies on
agreed remit
31-Dec-2024 Yes  
communicate and update new remit to all
staff
31-Jan-2025 Yes  
H/HEDAP/2024/039
Deliver a refreshed
process which will
ensure that time in
minimised for children
in all forms of
temporary
accommodation  
31-Aug-
2025
Review current open Homeless cases with
children
06-Dec-2024 Yes
Claire McKay  
Joint meeting between Homelessness and
Housing operations focusing cases who do
not have an offer
20-Dec-2024 Yes  
following on identify any new processes to
be implemented and rolled out to help
continually reduce times children spend in
temporary accommodation
31-Jan-2025 Yes  
Using additional Temporary
accommodation funds to focus on
acquisitions for those households in temp
with children waiting on offers
06-Apr-2025 Yes  
ongoing monthly monitoring of numbers
to review and maximise offers
31-Jul-2025 Yes  
H/HEDAP/2024/040
Design and deliver a
dynamic public
awareness campaign
focused on the
realities of
homelessness and
housing need  
31-Mar-
2026
Carry out recent research around stigma
and homeless 
with view to creating further actions to
take forward
20-Dec-2024 Yes
Donna Kirkwood; Mayra Nunes  
Liaise with WDC comms team on
appropriate campaign actions
31-Jan-2025 Yes  
Review WDC homeless webpage content
to ensure appropriate language/images
used around homelessness.
03-Feb-2025 Yes  
Identify positive case studies detailing 31-Mar-2025 Yes
Page 80

Page 81

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
household circumstances and support
provided by WDC to resolve homelessness
to highlight help available and realities of
homelessness.  
Prepare articles for Housing News, include
positive case studies and advice around
homelessness
31-Mar-2026 No  
H/HEDAP/2024/041
Review of Pathway 1
cases (i.e., those
homeless but not in
temporary
accommodation) over
6 months to assess if
in stable
accommodation (and
close if this is
confirmed)  
30-Apr-
2025
295 homeless applications where
temporary accommodation wasn’t
required, 198 cases closed when
applicants given a housing outcome. 86
cases closed no housing outcome. Most
common; asked to leave, fleeing domestic
violence and relationship breakdowns.  
Yes
Joanne Sutherland  
H/HEDAP/2024/042
Introduce a consistent
assessment of housing
and support needs
regardless of if a
tenant or presenting
as homeless  
31-Dec-
2025
Linked to action 48 being achieved first 31-Oct-2024 Yes
Claire McKay; Joanne Sutherland  
review support process once new housing
solutions services are rolled out
30-Sep-2025 Yes  
H/HEDAP/2024/043
Develop and
implement a new
approach to
resettlement and
humanitarian schemes  
31-Mar-
2026
Develop new job profile to meet changing
requirements
31-Aug-2025 Yes
Claire McKay  
Recruitment of new co-ordinator required
to take forward
31-Dec-2025 No  
once restructure and recruitment in place
new co-ordinator to review current
approach
31-Mar-2026 No  
H/HEDAP/2024/044
Minimise and eradicate
the use of unsuitable
accommodation for
homeless households  
31-Mar-
2025
Continue with monthly analysis of
placements in unsuitable accommodation
and breaches of UAO.
31-Mar-2025 Yes
Joanne Sutherland  
H/HEDAP/2024/045
Deliver the outcomes  
30-Apr-
2025
Objective 1 - whole system approach 27-Apr-2025 Yes
Claire McKay  
Objective 2 - rapid rehousing (16 weeks) 27-Apr-2025 Yes
Page 81

Page 82

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
of the Rapid
Rehousing Transition
Plan
Objective 3 - interim housing options 27-Apr-2025 Yes  
Objective 4 - housing first 27-Apr-2025 Yes  
H/HEDAP/2024/046
Explore expanding a
homelessness
prevention approach
and better managed
demand for temporary
accommodation  
31-Dec-
2025
Linked to Action 48 being achieved first 31-Oct-2024 Yes
Joanne Sutherland  
review in line with decrease of pathway 1
and increased need to for temp
13-Apr-2025 Yes  
Prevention workshops (young people/DV)
to take place with casework
29-Dec-2025 No  
H/HEDAP/2024/047
Introduce a "Mediation
First" approach to
housing applications
for 16–19-year-olds
(as a homelessness
prevention approach)  
31-Jan-
2026
Action 48 needs achieved first 31-Oct-2024 Yes
Joanne Sutherland  
Restructure - once in place and
introduction of youth specialist team put
process in place
31-Dec-2025 No  
H/HEDAP/2024/048
Implement a ‘One
Door’ preventative
housing access system
under one service to
prepare for new
prevention duties.  
31-Dec-
2025
actions 37, 42, 46 and 47 can then follow
on from this action if achieved
31-Oct-2024 Yes
John Kerr  
prepare a paper/proposal on option for
consideration to take to the access to
housing meeting
06-Nov-2025 Yes  
Agree principles relating to new one door
housing access system aligned to the new
Housing Solutions service
07-Nov-2025 No  
Paper on the possible vision to be taken to
Access to Housing Group in Oct 25
28-Nov-2025 No  
Develop implementation plan 12-Dec-2025 No  
H/HEDAP/2024/049
Upscale the Housing
First programme
through collaborative
commissioning  
31-Dec-
2025
review current provision 31-Mar-2025 Yes
Claire McKay   Take forward actions agreed following
HSCP meeting
14-Nov-2025 No  
H/HEDAP/2024/050
Deliver and implement
in partnership with
RSL a Common
Housing Register for
West Dunbartonshire  
31-Mar-
2026       Claire McKay
Page 82

Page 83

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
H/HEDAP/2024/065
Carry out
communication audit
to help manage
current and future
tenants’ and partners
expectations better on
housing availability  
01-Apr-
2026
Review current information available to
the public
08-Aug-2025 Yes
Donna Kirkwood; Claire McKay  
create a project plan following the review
of information on our webpages
12-Oct-2025 Yes  
Contact other partners to provide better
understood housing information
31-Dec-2025 No  
H/HEDAP/2024/066
Include exploring use
of supported lodging
whilst reviewing
different temporary
accommodation for
young people  
01-Apr-
2026
Contact other LAs with supported lodgings 31-Dec-2025 No
Claire McKay; Mayra Nunes  
Review feasibility following staff
restructure
06-Mar-2026 No  
H/HEDAP/2024/067
Review housing
allocation % to
households who
experience
homelessness  
01-May-
2025
Carry out modelling reviewing backlog,
expected demand and turnover with a
view to reducing current letting ask
30-Apr-2025 Yes 
Seek HIB approval and ask RSL to match 01-May-2025 Yes 
Icon Name  
4: Strengthen the Financial viability and capacity of the Housing Revenue Account and associated Housing and Homelessness budgets 
Code & Title Status Progress Due Date Milestone Due Date Done Assigned To  
H/HEDAP/2024/051
Complete the review
of Building Services
Repairs and
Maintenance service
costs to deliver
immediate efficiencies
to the HRA  
31-Mar-
2025
Building services action plan created 31-Oct-2024 Yes
Craig Wilson  
Deliver action plan - include service
efficiencies
31-Mar-2025 Yes  
H/HEDAP/2024/052
Explore innovative
housing investment
and partnership
models to maximise  
30-Nov-
2025       John Kerr
Page 83

Page 84

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
housing investment
approaches  
H/HEDAP/2024/053
Carry out review of
HRA contributions to
other non-housing
Council service areas  
31-Mar-
2026
Agreement made in 24/25 
CFO agreed to full whole system review of
HRA payments that will begin once Year
end work completed in 2025.
31-Mar-2025 Yes
Peter Barry  
take forward actions following whole
system review of all HRA payments by
Chief Finance Officer
31-Mar-2026 No  
H/HEDAP/2024/054
Examine the capacity
of the HRA and the
Council's General Fund
to deliver agreed
housing ambitions  
30-Jun-
2025
further review this action has been closed
as linked to action 53
31-Mar-2025 Yes
Peter Barry 
H/HEDAP/2024/055
Develop a 3-year
rental strategy in
partnership with
tenants to ensure
tenant priorities and
strategic housing
ambitions can be
delivered  
30-Nov-
2026       Stefan Kristmanns  
H/HEDAP/2024/056
Review Building
Services structures
and external
contractors to ensure
best value  
31-Dec-
2025
several actions part of the review already
taken place saving money
31-Mar-2025 Yes
Peter Barry   Last actions as part of the review to be
taken forward
30-Nov-2025 No  
H/HEDAP/2024/057
Working with other
local authority partner
re-examine housing
finance position in
Scotland to promote
the delivery of new
social housing
including the
treatment of historic  
31-Mar-
2025
Joint work with COSLA 01-Mar-2025 Yes
Claire McKay
Page 84

Page 85

Code & Title Status Progress Due Date Milestone Due Date Done Assigned To
HRA Capital Debt  
H/HEDAP/2024/058
Review homelessness
services funding with
aim of being able to
reduce level of
temporary
accommodation and
free up staff resource  
31-Mar-
2026       Peter Barry  
H/HEDAP/2024/059
Develop a refreshed
funding delivery model
for the delivery of new
housing in light of
increased borrowing
levels exploring
increased grant
benchmark levels  
09-May-
2025
take paper to more homes board for
approval on the viability of new agreed
benchmarking (£120K)
30-Apr-2025 Yes
John Kerr  
H/HEDAP/2024/060
Directly lobby the
Scottish Government
to ensure the cost of
achieving net zero in
social housing is met
with national funding
to ensure rental
income can be utilised
for improving current
and developing new
social housing.  
30-Apr-
2025
Link in via SIG this has fed into both
COSLA and ALACHO being clear tenants
should pay, and all measures should be
fully funded by Scottish government -
awaiting SG publication
30-Apr-2025 Yes
Claire McKay 
Action Status 
Cancelled 
Overdue; Neglected 
Unassigned; Check Progress  
Page 85

Page 86

Not Started; In Progress; Assigned 
Completed 
PI Status 
Alert 
Warning 
OK 
Unknown 
Data Only 
Long Term Trends 
Improving 
No Change 
Getting Worse 
Short Term Trends 
Improving 
No Change 
Getting Worse 
Risk Status 
Alert 
High Risk 
Warning 
OK 
Unknown 
Page 86

Page 87

West Dunbartonshire Council
Report by Chief Officer, Housing
Housing and Communities Committee:  19 November 2025
Subject:  More Homes West Dunbartonshire Strategic Housing Investment
Plan 2026/27 – 2030/31
1. Purpose
1.1 This report seeks approval and summarises the key points set out in West
Dunbartonshire’s Strategic Housing Investment Plan (SHIP) 2026/27 –
2030/31, which details the priorities for investment in new affordable housing
in West Dunbartonshire.
2.        Recommendation
2.1      It is recommended that the Council:
i) Agree the draft SHIP 2026/27 - 2030/31 as appended to this report,
designed to continue the delivery of an ambitious programme of new
affordable homes in compliance with the West Dunbartonshire Local
Housing Strategy 2022 -2027;
ii) Note the SHIP is wider in scope than in recent years, with a
requirement by the Scottish Government to demonstrate more clearly
its contribution towards addressing local and national priorities such as
homelessness, child poverty and the housing emergency; and 
iii) Invite the Chief Officer, Housing to implement the investment plan
inclusive of the Council’s new home delivery in partnership with
relevant stakeholders. 
3. Background
3.1 The Scottish Government requires local authorities to submit a Strategic
Housing Investment Plan (SHIP) each year.  The core purpose of the SHIP is
to set out the strategic investment priorities for new affordable housing over a
five-year period to achieve the outcomes contained in the Local Housing
Strategy. 
3.2     The SHIP focuses on the delivery of affordable housing by location, type and
tenure and indicates how the programme will be resourced, particularly
through the Scottish Government’s Affordable Housing Supply Programme
(AHSP) funding and its Council House Building Programme component.
ITEM 10
Page 87

Page 88

3.3      The SHIP sets out the funding priorities for new affordable housing in West
Dunbartonshire for the next five years, 2026/27 – 2030/31.   It complements
the West Dunbartonshire Local Housing Strategy 2022 - 2027 approved by
Council and submitted to the Scottish Government in November 2021 and
contributes to the delivery of national priorities particularly in relation to
homelessness, child poverty and the housing emergency.  
3.4   While the previous SHIP (2025/26 – 2029/30) was presented in the context of
a significant cut in funding to the Scottish Government’s Affordable Housing
Supply Programme (AHSP), the funding has this year been largely restored to
levels more in keeping with previous awards.  
3.5     The Scottish Government advises local authorities annually of their minimum
Resource Planning Assumptions (RPA) indicating what AHSP grant total will
be made available.  The current RPA for 2025/26 shows a slight increase in
resources from last year’s figure and stands at £11.363m.   This includes the
sum of £0.406m specifically allocated to acquire homes to help address
homelessness pressures.
3.6     This SHIP sets out proposals for a continuation of the high levels of new
affordable housing delivery achieved in West Dunbartonshire over recent
years.    
3.7 Where details are not yet known, the project grant levels have been estimated
based on current guidance with an estimated £120K per unit being projected
for both Council and Housing Association schemes.  There remains a
discrepancy between Council and Housing Association benchmark grant
levels, but it is anticipated that a higher proportion of larger family homes in
the Council programme attracting a higher level of grant will even out average
grant levels across the developing housing providers identified within the plan.
3.8     The Scottish Government grant funding required to deliver the priority projects
listed in the 5- year programme amounts to around £48.3m.   The programme
beyond the current financial year shows an over commitment of spend and
will need to be the subject of a smoothing exercise.  Despite this we remain
confident that the programme outlined can be delivered, even if some projects
may subject to delay.   Ongoing discussion will take place with the Scottish
Government’s More Homes Division over resourcing this SHIP programme.
3.9      In September 2025, the Scottish Government published its Housing
Emergency Action Plan which committed to a £4.9bn investment over the next
four years for the delivery of new homes, this will see an increased RPA
allocation for all Scottish local authorities and the welcome introduction of
multiyear funding allocations to strengthen the delivery of strategic housing
investment plans. Once the Scottish Government makes formal
announcements on this aspect of the Action Plan, such as the increased
funding and how this will be distributed to local authorities, the Council will
review the SHIP with a focus on maximising investment opportunities and
ensuring the delivery of affordable housing continues to meet the needs of
Page 88

Page 89

West Dunbartonshire’s communities.
4. Main Issues 
4.1     The purpose of the SHIP is to set out the strategic investment priorities for
increasing provision of affordable housing through new build and buyback
programmes in support of outcomes contained in the Local Housing Strategy.
This SHIP sets out the planned housing investment programme for 5 years,
covering the period 2026/27 – 2030/31.
4.2    The funding for the projects will be from two principal sources:
 the allocation from the Scottish Government’s Affordable Housing
Supply Programme
 borrowing from the developing organisation’s own lending resources.         
4.3    The SHIP contains tables detailing the projects included in the proposed
programme.  It should be stressed that inclusion in the SHIP does not
guarantee scheme approval, as each proposal will require to go through a
further detailed project and financial appraisal before funding is committed.
4.4    All new homes built through the SHIP will require to meet high quality
requirements including the Council’s Design Standard for Affordable Housing,
which was updated in November 2023, and which applies to all projects
commencing after April 2024. 
4.5     This SHIP provides more information than previously on how it will help in the
delivery of key priorities including those featuring in:
 Housing to 2040
 Housing Emergency Action Plan
 Child Poverty Action Report
 WD HSCP Strategic Plan
 Rapid Rehousing Transition Plan.
4.6    SHIP 2026/27 – 2030/31 Priority Projects
The priority projects for this period including those currently on site, are as   
shown in table 3 below.  All units are social rented unless otherwise stated
and unit numbers are draft in some cases.
Table 3: SHIP 2026/27- 2030/31: Priority Projects by Developer
Site/Developer Number of
Units
WDC
Willox Park,
Dumbarton Ph1
17
Bank St, Alexandria 22
Page 89

Page 90

Bonhill Gap Sites,
Alexandria
28
Dennystoun Forge,
Dumbarton
20
West Thomson St,
Clydebank
42
Willox Park
Dumbarton Ph 2
21
Ottawa Crescent,
Dalmuir
21
28 Bridge St,
Alexandria
8
Silverton, Dumbarton 9
O’Hare, Alexandria 6
Queen Mary Avenue,
Clydebank
17
Buybacks/ROTS 181
392 units
Wheatley Group/
(Loretto HA)
Dumbain Road,
Haldane  
23
23 units
Knowes HA
Abbeylands Road,
Faifley
27
Buybacks/ROTS 32
59 units
Dunbritton HA
Golfhill Drive,
Dalmonach
7
Cottage Hospital,
Dumbarton
10
17 units
Bellsmyre
Regeneration Phase
2
33                     
Bellsmyre
Regeneration Phase
3
34
Bellsmyre
Regeneration Phase
4
16
Bellsmyre
Regeneration Phase
5
28       
111 units
Dalmuir Park HA
Auld St, Dalmuir       32
Page 90

Page 91

Buybacks/ROTS       15
47 units
4.7   In total, the SHIP shows the delivery of around 649 affordable homes over the
5-year plan period. This level of development continues the ambitious new
affordable house building programme in West Dunbartonshire. The delivery
the plan will depend upon the support of our developing housing association
partners, an increase in funding from the Scottish Government and continued
Housing Revenue Account capital investment.
4.8    The SHIP is supported by funding from the Affordable Housing Supply
Programme to assist the popular Rental Off the Shelf (ROTS) / Buyback
programme of ex- local authority and Registered Social Landlord housing
stock, as well as acquisitions from the private sector including of-the-shelf
homes from house builders. It is proposed that over 200 units are acquired in
this way by the Council and participating RSLs over the five years of the plan.
4.9   The grant funding required to deliver this programme is estimated to be
around £51m.  While this figure is higher than our current confirmed Resource
Planning Target, an announcement is expected early in 2026 from the
Scottish Government on new levels of funding and a new multi-year funding
arrangement which will help in programme planning. 
4.10 Due to uncertainties over details of some of the proposed projects in the SHIP
and the availability of funding, the SHIP will require to demonstrate flexibility
and will be subject to continual monitoring and evaluation.  The SHIP lists a
series of reserve/shadow projects which we hope will feature in the
programme as it progresses.   Monitoring of progress will be carried out
through the Council’s performance management system and through key
structures such as the Strategic Housing Providers Forum, More Homes
Project Board and programme review meetings with the Scottish Government.
4.11 The Council has carried out an analysis of potential projects against an
objective Prioritisation Scoring Matrix and scored them accordingly.  A
number of factors are taken into account including type of housing being
proposed, deliverability, value for money, and compliance with key local and
national housing objectives.   Where a project proposes an element of
particular needs /specialist provision, engagement takes place with the West
Dunbartonshire Health and Social Care Partnership.   
5. People Implications
5.1 While there are no direct people implications.
6. Financial and Procurement Implications     
6.1 The ability to deliver the SHIP relies on continuing to receive appropriate
levels of grant from the Scottish Government. West Dunbartonshire’s
Resource Planning Assumption (RPA) from the Scottish Government for
2025/26 is £11.3863m. For the SHIP to be delivered in full, RPA levels would
require to increase above current levels, however we expect to see this this
Page 91

Page 92

following the Scottish Government commitment to £4.9bn of investment over
the next four years in the delivery of new homes, this will see the introduction
of multiyear funding allocation to strengthen the delivery of strategic housing
investment plans.
6.2 The programme of projects shown in the SHIP can only take place if both its
two principal funding streams, namely the developing landlord using
reserves/borrowing and Scottish Government Affordable Housing Supply
Programme grant, are able to provide the required ongoing financial support. 
It is estimated that the total grant ask of the Affordable Housing Supply
Programme would be around £48m. 
6.3      West Dunbartonshire’s New Build Programme has been closely aligned with
Housing Revenue Account affordability, through the ongoing rent consultative
exercise for 2026/27. In respect of the Council House Build element, financial
modelling demonstrates that the new council house building programme is
beneficial to the long-term health of the Housing Revenue Account.  However,
care requires to be taken to ensure that the prudential borrowing required is
financially sustainable.
6.4      There is a danger that future resource allocation could suffer if the SHIP fails
to deliver on the programme contained in this SHIP.  In most recent years we
have not only been able to meet our spend targets but have attracted
additional funding from underspend elsewhere within the national programme.
6.5      The Council is continuing to lobby for increased grant levels from the Scottish
Government and where appropriate will apply for above benchmark awards
on a project-by-project basis.
6.6 There are no procurement implications to note.
7. Risk Analysis
7.1 Inevitably, with such a varied programme of projects there are risks that the
ambitious outputs set out in the SHIP will not be met.  A number of the
projects are at an early stage with site investigations not having been carried
out or infrastructural constraints fully known.
7.2      There is a risk that Affordable Housing Supply Programme funding will be
reallocated to other Council areas if the Council is unable to spend within any
financial year.  Housing Development staff will liaise regularly with Scottish
Government More Homes colleagues to address any concerns of this nature,
to maximise spend within West Dunbartonshire.
7.3 If the development of new affordable housing, the level of housing need will
increase with negative consequences for West Dunbartonshire’s communities
and wider Council finances. Monitoring of progress will be carried out through
key structures such as the Strategic Housing Providers Forum, the Housing
Improvement Board, the More Homes Project Board and programme review
meetings with the Scottish Government.   A new SHIP will be submitted
Page 92

Page 93

annually to the Scottish Government each October and will be the subject of a
report to the Housing and Communities Committee.
8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9.       Equalities Impact Assessment
9.1 Equality is central to all housing and housing services delivery. An Equalities
Impact Assessment (EIA) has been undertaken on the Local Housing
Strategy 2022-27 to ensure that the needs of local communities have been
fully considered. The SHIP reflects identified needs and draws on findings
from the EIA when considering the implications flowing from the translation of
strategic aims into housing policies.
9.2      All new housing supported through the programme will be compliant with the
West Dunbartonshire Design Standard and will meet the Housing for Varying
Needs requirements.  The West Dunbartonshire Design Standard requires
developers in the programme to provide higher standards than those required
by statute and are of particular benefit to those with mobility issues.  The
SHIP supports the delivery of specialist housing provision and generally
allows for a 10% element in each project.  We place an emphasis in the SHIP
on increasing the supply of larger family homes, to help address child poverty.
10.      Consultation
10.1   The SHIP was drawn up in consultation with potential housing association
partners and the Scottish Government More Homes Division.    Where an
interest has been shown, detailed discussions have taken place with the
prospective developer on how the project could be accommodated in the
programme.  
10.2 The West Dunbartonshire Tenants and Residents Organisation received a   
presentation on the proposed SHIP in October 2025 and are supportive of its
aims in particular the council new build developments.  
10.3   The preparation of the SHIP has been a corporate task, involving all relevant
departments of the Council and has been carried out in collaboration with
colleagues in the Scottish Government More Homes Division.  The Health and
Social Care Partnership was an active partner in preparing the plans where
there was a significant element of specialist accommodation involved, and a
number of projects were significantly amended as a result
11. Strategic Assessment
Page 93

Page 94

11.1   This Strategic Housing Investment Plan presents the priorities for affordable
and deliverable housing development for the next five years as set out in the
Local Housing Strategy.             
It also supports the Council’s key strategic priorities to:
 Improve local housing and environmentally sustainable
infrastructure
 Improve economic growth and employability
 Improve the well-being of communities and protect the welfare of
vulnerable people
 Improve care for and promote independence with older people
 Improve life chances for children and young people. 
Peter Barry, Chief Officer, Housing
Date:   5 November 2025
Person to Contact: John Kerr, Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, 16 Church Street,
Dumbarton John Kerr@west-dunbarton.gov.uk
Jamie Dockery, Senior Housing Development Officer,
Housing Development and Homelessness Team,
Jamie.dockery@west-dunbarton.gov.uk
Appendices:                      Appendix 1: Strategic Housing Investment Plan             
2026/27 - 2030/31
Background Papers: West Dunbartonshire Council’s Local Housing Strategy
2022-2027
West Dunbartonshire Council’s Local Housing Strategy
2022-2027 EIA
Wards Affected: All Wards
Page 94

Page 95

West Dunbartonshire Council
Draft Strategic Housing Investment Plan 
2026/27 – 2030/31   
October 2025 
ITEM 10 - APPENDIX 1
Page 95

Page 96

Contents                              Page 
1. Introduction                                                                                         
2. Purpose of the Strategic Housing Investment Plan                                      
3. Key Objectives                                                                                                        
4. Policy Context                                                                                                             
5. Local Housing Strategy 2022 -2027 
6. Housing Priorities and the Housing Emergency 
7. Specialist Housing Needs and Wheelchair Accessible Targets 
8. Rapid Rehousing Transition Plan Priorities 
9. Alignment with Child Poverty Action Report                                                                                                          
10. Project Assessment Methodology                                                               
11. Fair Work First            
12. Funding                                                                                                           
13. Progress on Previous SHIP  2025 - 2030                                                                                                                                                                                                                                         
14. SHIP 2026 -2031 Priority Projects                                                                           
15. Construction Methodology and Procurement 
16.  Purchase of Existing Homes through Buyback and ROTS Schemes   
17. Gypsy/Traveller Sites 
18. Key Worker Housing Projects                                                             
19. Consultation                                                                                           
20. Vacant and Derelict Infrastructure Fund                                                                                         
21. Empty and Second Homes Actions                                                                         
22. Developer Contributions                                                                                                                                                            
Page 96

Page 97

23. Constraints to Delivery 
24. Local Authority Assistance in Delivery of the SHIP                                                                                                                                                       
25. Energy Efficiency, Environmental Standards and Sustainability                 
26. Equalities                                                                                                                                                                     
27. Strategic Environmental Assessment                                                                                                           
28. Monitoring and Publication                                                                                                                                                                         
Annexe A: SHIP Project Template 
Page 97

Page 98

(Convener foreword to be added) 
1. Introduction 
1.1 This Strategic Housing Investment Plan (SHIP) 2026/27 – 2030/31 sets out the
funding priorities for affordable housing in West Dunbartonshire for the next
five years.   
1.2 The focus of the SHIP is the targeting of the Scottish Government’s Affordable
Housing Supply Programme Funding (AHSP), including its Council House
Building Programme component towards addressing the priorities laid out in
the West Dunbartonshire More Homes Better Homes Local Housing Strategy
2022 – 2027 
1.3 The SHIP details how the Council will assist in meeting the Scottish
Government’s commitment to support new affordable housing as set out in
the Housing to 2024 strategy and in supporting the Scottish Government’s
affordable housing supply objectives as set out in the Housing Emergency
Action Plan announced by the Cabinet Secretary for Housing on 2nd September
2025.   
1.4 The SHIP has been prepared considering the Strategic Housing Investment Plan
(SHIP) Guidance note MHDGN 20MC25/01 issued by the Scottish Government
in May 2025. 
1.5 Housing has worked with all appropriate service areas and with the West
Dunbartonshire HSCP in the preparation of this Plan. Consultation has taken
place with the RSLs operating in West Dunbartonshire through the Strategic
Housing Providers Forum and regular programme/liaison arrangements.  The
umbrella organisation for tenants’ and residents’ groups in the area, the
WDTRO, is very supportive of the Council’s new build programme and was
consulted on the draft SHIP.  The Scottish Government More Homes Division
Glasgow and Clyde Area Team have contributed to the preparation of this SHIP
and will have an ongoing role in monitoring the programme. 
1.6 To assist in advance planning of housing investment, the Scottish Government
advises local authorities annually of their minimum Resource Planning
Assumptions (RPA) indicating what AHSP grant total will be made available. The
RPA for 2025/26 issued on 1st May 2025 shows a slight increase in resources
from last year’s figure and stands at £11.363m.   This includes the sum of
£0.406m specifically allocated to acquire homes to help address homelessness
pressures.   
1.7 Local authorities have been advised to operate carry forward limits beyond
2025/26 of 80%, 60% and 40% for the three subsequent years. This would give
RPA grant figures as shown in Table 1 below.  In three out of the last five years
we have been able exceed our initial RPA, with additional grant funding having
Page 98

Page 99

been released by the Scottish Government More Homes Division.  This is
reflective of the Scottish Government’s confidence in our ability to deliver an
effective affordable housing supply programme in West Dunbartonshire. 
Table 1: WD Estimated RPA from 2025/26
Year Resource Planning Assumptions at
May 2025
2025 – 2026  £11.053m 
2026 – 2027 £8.842m
2027 - 2028 £6.632m
2028 - 2029 £4.421m
Total £30.948m 
Table 2: WD RPA and Outturn for last 5-years
Year RPA Actual Variance
2023 - 2024  £10.795m £12.706m* + £1.911m
2022 – 2023 £10.788m £6.195m - £4.593m
2021 – 2022 £12.515m £9.854m - £2.661m
2020 – 2021 £11.128m £18.972m + £7.844m
2019 - 2020 £12.040m £20.693m + 8.653m          
*   Estimated Outturn for 2023 -2024.  All other figures SG published. 
1.9  Funding shown for projects is an indication only of the spending plans and at
this stage does not guarantee that these sums will be made available to the
developer.  Each proposal will require going through a further detailed
assessment before funding is committed and confirmed in the SLPA.        
1.10    The Scottish Government issued a Strategic Local Programme Agreement to
West Dunbartonshire Council (SLPAs) on 16th July 2025 which sets out the
programme of housing that can expect to be funded through the AHSP for
2025/26.   Detailed discussions were held at programme meetings with
developing RSLs to plan the anticipated spend over the course of the SHIP.  In
launching the Housing Emergency Action Plan, the Scottish Government
announced the intention to introduce multi-year funding to give social housing
developers.  The details of this welcome measure have still to be announced.   
This SHIP accords with the current SLPA which will be subject to ongoing
review.  
2. Purpose of the Strategic Housing Investment Plan 
2.1   The principal purpose of the SHIP is to set out the strategic investment priorities
for affordable housing over a 5-year period to achieve the outcomes set out in
the LHS.   This SHIP sets out the planned housing investment programme for 5
Page 99

Page 100

years, covering the period 2026/27 – 2030/31.  As yet, it is uncertain how
much committed spending will be carried forward from 2025/26 to 2026/27. 
Due to funding uncertainty, the emphasis is placed on the early part of the
programme. 
2.2   The SHIP:
• Sets out investment priorities for affordable housing
• Demonstrates how these will be delivered
• Identifies the resources required to deliver these priorities
• Enables the involvement of key partners in the delivery of affordable
housing. 
2.3   Key investment priorities on a site-by-site basis are set out in the template
attached to this plan (Annexe A).  The template gives information on the
following: 
• The priorities for new affordable housing projects
• Estimated start and completion dates
• Projected funding sources 
• The number of units to be provided (by tenure and type)
• Estimated funding requirements of projects.   
3. Key Objectives   
3.1 The overarching objective of the SHIP is to help deliver on the Council’s key
affordable housing delivery priorities as contained in the Local Housing
Strategy, by directing investment to the agreed regeneration areas and
increasing the supply of new affordable housing across West Dunbartonshire.
The LHS sets an annual Housing Supply Target of 230 new houses across all
tenures, with 80 of these being for Social Rent.   
3.2   The Council has welcomed the Scottish Government’s commitment to deliver
110,000 affordable homes by 2032 supported by measures such as increasing
investment, legislative programming to make Planning more effective and
supporting infrastructure.    Under its More Home West Dunbartonshire
initiative, the Council set out ambitious plans to deliver 2,500 new social and
affordable home in the same period, a figure in excess of the Council’s Housing
Supply Targets. 
4. Policy Context 
4.1 The value of providing new social housing is widely recognised.  In July 2025,
Shelter published its study The Social Value of New Social Housing in Scotland
which calculated that each new social tenancy in Scotland can generate on
average £11,639 in social value within just six months of a tenant moving in.
This figure includes a £990.44 saving to the public purse and £10,648 in
wellbeing value to the tenant, who benefits from improved opportunities such
Page 100

Page 101

as securing employment, better health, transport connections, and reduced
housing costs, thanks to their new social home. 
4.2 Housing to 2024 sets out the Scottish Government’s housing vision and its road
map to get there. It aims to deliver their ambition for everyone to have a safe,
good quality and affordable home that meets their needs in the place they
want to be. 
4.3 The West Dunbartonshire Local Strategy 2022 - 2027 provides the principal
West Dunbartonshire Council policy backdrop to the SHIP. 
4.4 The plan is informed by a Housing Need and Demand Assessment (HNDA)
designed to give broad, long-term estimates of the number of additional
housing units that may be required to meet existing and future housing need
and demand. The HNDA was produced by Glasgow City Region Housing Market
Partnership (GCRHMP) in June 2024 for the Glasgow City Region and is known
as ‘HNDA3’. It was developed in accordance with legislation and relevant
statutory guidance including the Scottish Government’s Practitioner’s and
Manager’s Guides of 2020.  West Dunbartonshire plans to carry out further,
more locality-based need and demand assessment.   
4.5 West Dunbartonshire Council through its representative organisations COSLA
and ALACHO will continue to engage with the Scottish Government in
identifying more effective and better value processes for the delivery of new
affordable housing including on parity between Council and RSL benchmark
subsidy rates.   
5.     Local Housing Strategy 2022 -2027 
5.1   The Local Housing Strategy continues to place an emphasis on regeneration,
recognising the need to improve many of our neighbourhoods and to provide
housing which meets the changing requirements of our communities.
However, we do also recognise that there are imbalances in terms of the type
of housing which is required across all communities. Physical access to too
many of our homes is an issue. We will therefore encourage the provision of
more accessible housing and ones which are suitable for wheelchair users (See
Section 7 below). Similarly, we know that there is a size imbalance between the
available housing and the demand, with particular shortages of 1-bedroom
properties and larger family houses (4-bed and above). Developers seeking to
access AHSP funding must consult with WDC Housing services on how best to
contribute to addressing these imbalances and meeting the objectives of the
LHS. 
5.2   In addition to the regeneration agenda, the Council is keen to encourage an
increase in the housing supply more generally across West Dunbartonshire to
mitigate an ageing demographic and to stimulate the local economy. 
Page 101

Page 102

5.3   The Council, as the statutory Strategic Housing Authority, has the lead role in
setting out the investment priorities for the delivery of affordable housing and
through the “More Homes West Dunbartonshire” approach, we work with our
strategic development partners to take forward opportunities to provide a
broad range of high quality affordable homes in safe and attractive
neighbourhoods that meet the needs of our residents.   
5.4   The Health and Social Care Partnership (HSCP) provides knowledge on the
health and social care needs of the West Dunbartonshire population. The SHIP
supports the over-arching policy of shifting the balance of care from
institutional settings to home-based support in the community. The Local
Housing Strategy notes that successful housing and social care support
depends on the location, model and range of housing available. Section 7
below outlines how we aim to support the housing needs of groups.  
5.5  The WD HSCP Strategic Plan 2023 -2036, notes the important role housing will 
play in health, as homes can impact on people’s health in a way that few other
factors can, and commits to working  with partners to expand the choice of
specialist and particular housing options for children and adults.   
5.6   Given the local ageing demographic, the prevalent topography and the nature
of our housing stock, accessibility to housing for people with a mobility issue is
a big concern in West Dunbartonshire. All new housing supported by the AHSP
is required to satisfy Housing for Varying Needs (HfVN) criteria and our West
Dunbartonshire Housing Design Standard. We also aim to continue to improve
the supply of housing suitable for wheelchair users. In some circumstances the
provision of lifts may present a solution to accessibility issues. Where no
specific specialist housing provision is included in the project, it will generally
be assumed that around 10% on each site will be for this purpose, with the
details being agreed in consultation with HSCP colleagues. 
5.7   Housing can play an important role in helping to revitalise town centres. Such
developments can bring wider benefits to the towns and provide many
advantages for residents including easier access to shops and services and help
lower the carbon footprint. We collaborate with our colleagues in
Regeneration Services to consider opportunities which complement their town
centre improvement agenda. The Artizan Centre in Dumbarton features in the
SHIP and we will consider future town centre sites which form part of wider
town centre regeneration initiatives. 
5.8    Research carried out in 2014 did not indicate a strong market for
intermediate/mid-market rent products (MMR). However, we are presently
revisiting the issue. 
Page 102

Page 103

6.      Housing Priorities and the Housing Emergency 
6.1    West Dunbartonshire Council declared a Housing Emergency on 1st May 2024
with the Scottish Government doing likewise a few days later. 
6.2    West Dunbartonshire Council has drawn up a Housing Emergency Action Plan,
overseen by a Working Group which meets regularly to monitor progress. The first
theme of the Action Plan is to Deliver and Maintain the More Homes - West
Dunbartonshire Approach to the Delivery of Affordable Housing. 
A number of the key actions under this theme are directed at increasing the supply
of new affordable housing including:
• Continue to lobby the Scottish Government for increase in AHSP funding (in
partnership with COSLA/SOLACE/ALACHO)
• Deliver new Strategic Housing Investment Plan and the Council's approved new build
programme, helping to meet the identified housing need  
• Scale up and extend the Buy Back Scheme to meet the key housing demand factors
• Explore innovative housing investment and partnership models to maximise housing
investment approaches. 
6.3   The Scottish Government published its Housing Emergency Action Plan Tackling    
Scotland’s Housing Emergency on 02 September 2025. The SG actions sit under   
three key objectives:
• Ending children living in temporary accommodation
• Supporting the housing needs of vulnerable communities
• Building our Future – maximizing investment in Scotland’s housing sector. 
The WDC Action Plan actions complement these objectives. 
7.     Specialist Housing Needs and Wheelchair Accessible Targets 
7.1    The West Dunbartonshire Health and Social Care Partnership’s Strategic Needs
Assessment – Adults and Older People 2022 provides the most valuable
information base for predicting future requirements for the ageing West
Dunbartonshire population. This is currently being reassessed and will be
monitored for any significant changes. The key consideration for Housing in
looking at the data is how does it translate into need for a housing solution,
either through existing stock or new homes. The clear emphasis will be
increasingly towards meeting needs in residents’ own homes through support
and aids/adaptations. We are engaging with the HSCP over what models of
supported accommodation best meet future needs in West Dunbartonshire. 
Page 103

Page 104

7.2   Wheelchair Accessible Housing            
West Dunbartonshire requires all social rented projects receiving AHSP grant
support to provide a 10% element of fully wheelchair accessible housing
(WCH). The detail of this requirement is spelled out in the WD Design Standard.
The provision of WCH housing in the private sector remains largely
discretionary but it is proposed that the matter will be considered further when
drawing up the next Local Development Plan and associated guidance. Our
next LHS will be informed by the outcome of these considerations. 
It has been agreed that more work is required to better understand the future
requirement for homes designed to this standard. Discussions are ongoing with
HSCP to help predict these needs and to consider how best we can gather data. 
Table 3 below shows the numbers of fully WCH homes delivered through the
SHIP over the last 5 years. It shows a generally improving performance in
meeting the 10% target. In certain circumstances the site topography will not
lend itself to the provision of fully wheelchair accessible housing, but even in
such cases, all homes in the SHIP will at least meet Housing for Varying Needs
Standards, with at least one main entrance. 
Table 3: Delivery of Fully Wheelchair Housing through the AHSP
Year RSL
Completions 
RSL
WCH
WDC
Completions
WDC
WCH
Total
%age 
2024/25 0 0 74 9 12.2
2023/24 24 4 0 0 16.7
2022/23 253 29 29 5 8.7
2021/22 200 9 306 18 5.3
2020/21 54 4 0 0 7.4     
7.3 People with Disabilities and Mobility Issues 
Records show that by category the following numbers of people living with
disabilities reside in West Dunbartonshire: 
• Frail Elderly 65+: 3,297 (of whom 20% have dementia diagnosis)
• Physical Disability Under 65: 301
• Neurological Conditions Under 65: 221 (includes Parkinsons, MND, Epilepsy,
Stroke Disease, Cerebral Palsy, MS, Acquired Brain Injury etc.)
• Children with disabilities (15-20): eighty-eight
• Learning Disability: 394. 
West Dunbartonshire has a 65+ population of 18,495 or 20.8% of the total. This
compares with 17.6% for GG&C and 20.5% for Scotland.  Eighteen percent of our 65+
residents receive social care/support or community alarm/telecare services. 
Page 104

Page 105

The vast majority of those falling into any of these categories will be satisfactorily
housed within mainstream housing, although often with home support. Aids and
adaptations together with better targeted lettings through social housing allocations
will provide the principal routes to addressing accessibility issues for most people. All
homes developed with AHSP funding assistance as a minimum comply with Housing
for Varying Needs Standard, with a quota of at least 10% meeting the higher fully
wheelchair accessible standard. 
We have piloted a Housing for the Older People new build model which provides a
mix of flatted and terraced homes for older people. In addition to the better
accessibility noted above, these homes feature dementia-friendly elements such as
colour coded landings, glass fronted kitchen cabinets and higher electric points
throughout. 
Aids and Adaptations:  The report What’s Next for Adaptations? was published in
August 2025  by the University of Edinburgh in conjunction with Scotland’s leading
housing bodies.  The report warns of an adaptations crisis and urges the Scottish
Government to take more effective action on the issue. It is expected that this
Mount Pleasant Old Kilpatrick - Homes for Older People: Case Study 
Set in the village of Old Kilpatrick, Mount Pleasant is an affordable housing
development for social rent providing 19 new homes for the over 60s, who were
looking to downsize from larger tenanted family homes. The project was
completed in May 2025. 
The social rented homes vacated by tenants moving to Mount Pleasant will be
let to families on our waiting list, an effective way of providing family homes
which are in high demand. 
Designed to Housing for Varying Needs and Dementia Design guidance, the
homes support ageing in place and provide an inclusive community for
residents. 
The development includes 1- and 2- bed homes within three blocks of flats,
terraced bungalows, and cottage flats arranged around a central community
garden. All homes have access to private garden space, via a low maintenance
garden or balcony. 
The garden is a focus and social hub for residents, offering attractive seating
areas and allowing opportunities to participate in growing flowers or vegetables
in the raised beds. 
We believe this is a model of housing which will work well in other locations
across West Dunbartonshire, creating smaller, accessible homes for older
people while freeing up larger homes elsewhere for families. 
Page 105

Page 106

publication will lead to more debate on the issue, and impact on future policy
development. 
Housing Allocations: WDC, in partnership with several locally operating RSLs, have
introduced a common application form with a view to developing a future integrated
common housing register. It is hoped that such a development will help applicants to
find accommodation to match their needs, including where there are accessibility
issues. 
7.4 People Leaving Supported Accommodation/Care Leavers 
There are several anti-poverty measures in place within West Dunbartonshire  
to support our care experienced young people. These include: 
• Council Tax exemption for care leavers up to the age of 26 years
• Rent abatement for care leavers in ongoing further education (which also includes 
modern apprentice posts), allowing for full access to the Care Experienced bursary. 
• Payment of £2,000 available to Care Leavers for setting up their own first tenancy. 
• There is also the Care Leavers Housing Protocol, which provides care leavers with 
access to affordable, permanent housing. Fifty-one young people have accessed
tenancies.
through this route since 2019, and 85% of the young people have remained in them. 
7.5   Supported Accommodation 
A property within Bridge Street, Alexandria, which is currently owned by West
Dunbartonshire Housing, has been identified as an option for renovation and
refurbishment to provide suitable supported accommodation (6 bedrooms) for
young people who are transitioning from being looked after to independent
living. 
8.     Rapid Rehousing Transition Plan 
8.1   An update is provided monthly on progress on the RRTP to the Council’s
Housing Improvement Board. The key SHIP priorities align with those in the
RRTP, not least in respect of the drive to increase the number of affordable
homes available and in particular the emphasis placed on increasing the
numbers of larger family and 1-bedroom homes. 
8.2    WDC allocates one property in each new AHSP-funded development for
Housing First purposes and encourages all other new housing developers to do
likewise. 
9.     Alignment with Child Poverty Action Report 
Page 106

Page 107

9.1    Addressing Child poverty is a highest-level priority for the Scottish Government.
West Dunbartonshire Council sees enhancing family incomes and reducing the
cost of living as the key focus for addressing the issue.         
9.2    The West Dunbartonshire Local Child Poverty Action Report 2024/2025          
notes the support given through the LHS to assist in addressing child poverty
and undertakes to review further how best to support priority families through
housing measures. 
9.3    Recognising the value of adequate accommodation and the historic under
provision, this SHIP continues to place an emphasis on larger family homes (4-
bed and above) in both the new build and buyback programmes. We will
consider strengthening our commitment to building these larger homes by
amending our Design Standard to require each mainstream project to include a
10% element of larger homes. Energy efficiency is a key element required of
SHIP supported new build projects. We have seen that well-insulated homes
can have a huge impact on reducing home energy bills, a particularly important
positive for larger families. 
9.4    Our buy-back and ROTS schemes also are weighted towards the acquisition of
larger family homes, with four bedrooms and above. 
9.5    The HSCP is developing a new strategic needs assessment for children and
young people, and this is anticipated being available in Autumn 2025. Based on
this information, we will assess how these needs translate into housing
requirements and what this might mean for the SHIP in the future, perhaps
through custom-built solutions. 
10.   Project Assessment Methodology 
10.1  Projects considered for inclusion in the SHIP are subject to a matrix-based
scoring analysis to assess their relative merits. Various criteria are employed in
assessing and prioritising the projects. These are: 
• the strategic priorities of the Council 
• contribution towards meeting the assessed housing need and demand,
including the provision of larger family homes (4 bed and over)
• meeting regeneration and re-provisioning objectives
• SIMD scoring
• affordability
• deliverability including Planning compliance and site constraints  
• level of grant subsidy required. 
10.2 There are information gaps in respect of some projects: these have been listed
on the scoring pro-forma as future sites and will be subject to reassessment
Page 107

Page 108

when the full information is available.   Not all will have been scored as yet.
These may feature in future iterations of the SHIP. 
11.      Fair Work First   
All developers with projects in the SHIP are required to comply with mandatory
Fair Work First criteria and commit to the desirable criteria.   Confirmation of
compliance will be provided to the Scottish Government annually. 
12.     Funding 
12.1   Funding for the projects in this programme comes from two principal sources: 
• the allocation from the Affordable Housing Supply Programme as detailed
at 1.6 above and
• the resources from the housing providers sources, primarily private
borrowing by RSLs and Prudential borrowing by the Council. 
12.2   Unless otherwise known, we assume that both Council and RSL projects will be
seeking grant support of £120,000 per house.  This compares with a current 3-
person equivalent benchmark figure of £87,763 for Councils and £95,741 for
RSLs, although additional grant is payable for projects meeting additional
quality benchmarks, including on low carbon, fire suppression and EV charging.     
We will continue to liaise with Scottish Government More Homes colleagues on
developments which require higher than benchmark awards, especially those
supporting the strategic priority of increasing the supply of larger family
homes.   
12.3   Where a Council House Building project is proposed on a Housing Revenue
Account owned site, it is assumed that there will be no acquisition costs to the
project.   
12.4   In collaboration with the Scottish Government More Homes Division, and
representative bodies such as ALACHO, the Council will continue to consider
alternative and innovative funding proposals for the delivery of affordable
housing.    In addition, we will seek to explore with partner RSLs any
opportunities to support the programme with funding from their financial
reserves or other sources. 
13.     Progress on Previous SHIP 2025 - 2030 
13.1   The progress on the SHIP 2025/26 - 2029/30 priority projects are summarised
below.   
Table 4: Progress on Previous SHIP 2025/26 – 2029/30 Priority Projects
Page 108

Page 109

Project/
Developer
Units  Status in SHIP
November 2024
Update at September 
2025
Clydebank
East/WDC
88 On site
Est complete
October 2024
Complete April 2025
Mount
Pleasant, Old
Kilpatrick 
19 On site
Est Complete 
May 2025
Complete
May 2025
Pappert,
Alexandria/
WDC 
26 Est Complete May
2025
Complete
June 2025
Willox Park
Ph1/
WDC
17 Est Site Start 
Jan 2026 
Est Completion
Jan 2027
On Site
Due complete
January 2026 
Bank St,
Alexandria
/WDC
22 Est Site Start May
2025
Est Completion
May 2026
Site start October 2025
Due complete Jan 2027
West Thomson
St, (Clydebank
Health Centre)
/WDC 
42 Est Site Start
October 2025
Est Completion
November 2026
Site start July 2026
Due complete Feb 2028
Abbeylands
Rd, Faifley
(Bowling Club)
/Knowes HA
27 tbc Est August 2025 Estimated site start
summer 2026.
Bellsmyre
Regeneration 
Phase 1
/Caledonia HA
27 Est Site Start
November 2024
Site Start March 2025
Due complete March
2026
Dalquhurn Ph4
/Caledonia HA
25 Site July 2024 Complete
September 2025 
Golfhill Drive,
Alexandria/
Dunbritton HA
7 Est Site Start
March 2025
Est Completion
March 2026
Est Site Start Oct 2025
Due complete Oct 2026
Bonhill Gap
Sites/WDC
28 Est Site Start 
April 2025
Est Completion
May 2026 
Start Aug 25
Due complete Sep 26
Dalquhurn
Phase 5&6
Caledonia HA
25SR/25SE Est Site Start
June 2025
Est Completion
December 2026
New masterplan
required. Tenure being
reconsidered.
Uncertain start date.
Page 109

Page 110

14.     SHIP 2026/27 – 2030/31:   Priority Projects 
14.1   The priority projects for this period are as shown in table 5 below.  All units are
social rented unless otherwise stated and unit numbers are draft in most cases. 
Table 5: Priority Projects (including those on site).  Sept 2025
Site/Developer Number of Units  Construction    
Method
WDC 
Willox Park,
Dumbarton Ph1
17 MMC Off Site
Manufacturing,
Enhanced timber
frame systems
Bank St, Alexandria 22 MMC Off Site
Manufacturing,
Enhanced timber
frame systems
Bonhill Gap Sites,
Alexandria
28 MMC Off Site
Manufacturing,
Enhanced timber
frame systems
Dennystoun Forge,
Dumbarton
20 Undecided. 
Possible off-the-
shelf chalet.  
West Thomson St,
Clydebank
42 TBC
Willox Park 
Dumbarton Ph 2
21 MMC Off Site
Manufacturing,
Enhanced timber
frame systems
Ottawa Crescent,
Dalmuir
21 est TBC
28 Bridge St, Alexandria 8 Refurbishment
Gilmour Ave,
Hardgate
/WDC 
2 Site Start
September 2024
Est Completion
February 2025
On site
Due complete Dec 25
Dennystoun
Forge/WDC
20 Est Site Start
September 2025
Est Completion
September 2026
Est Start July 26
Due complete March 27
Queen Mary
Ave, Drumry
/WDC
17 Est Site Start
October 2025
Est Completion
October 2026
Est Site start Oct 25
Due complete Dec 26
Page 110

Page 111

Silverton, Dumbarton 9 TBC
O’Hare, Alexandria 6 TBC
Queen Mary Avenue,
Clydebank
17 MMC Off Site
Manufacturing,
Enhanced timber
frame systems
Buybacks/ROTS 181 N/A
392 units 
Wheatley Group/ (Loretto
HA) 
Dumbain Road,
Haldane   
23 TBC
23 units 
Knowes HA 
Abbeylands Road,
Faifley 
27 est TBC
Buybacks/ROTS 32 N/A
59 units 
Dunbritton HA 
Golfhill Drive,
Dalmonach
7 MMC - Closed
panel timber kit
system/factory
installed window
Cottage Hospital,
Dumbarton
10 TBC
17 units 
Caledonia HA
Bellsmyre Regeneration
Phase 2
33                        MMC -
closed/partially
closed timber
frame panels
Bellsmyre Regeneration
Phase 3
34 MMC -
closed/partially
closed timber
frame panels
Bellsmyre Regeneration
Phase 4
16 MMC -
closed/partially
closed timber
frame panels
Bellsmyre Regeneration
Phase 5
28 MMC -
closed/partially
closed timber
frame panels
111 units 
Dalmuir Park HA 
Auld St, Dalmuir        32 TBC
Buybacks/ROTS        15 
Page 111

Page 112

47 units 
14.2   Reserve Projects       
In addition to the projects listed above and designated as priorities, the SHIP
contains several additional projects which may be able to be carried out
towards the end of the plan period.   A number of these projects are quite well
advanced.  Some have been in receipt of AHSP grant funding and in these
cases, there will be a presumption that they will proceed.  Slippage in the
priority programme may allow some to be brought forward more quickly. 
These additional projects are as listed below, but these should be considered
as tentative, with notional numbers at this stage: 
Table 6: Reserve Projects
Site Developer Number of Units -
Notional
Artizan Centre.
Dumbarton
WDC TBC
BMQ, Clydebank WDC TBC
Cottage Hospital,
Dumbarton 
Dunbritton HA          8 
Dalquhurn Ph 5 Caledonia HA 25
Dalquhurn Ph 6 Caledonia HA 25
Edinbarnet, Faifley TBC TBC
Queens Quay Site C WDC 20
Radnor Park Hotel,
Clydebank
WDC TBC
Sheltered Housing
Reprovisioning
WDC TBC
Skypoint, Faifley  TBC TBC
Stanford St, Clydebank Clydebank HA TBC
Smollet/Dumbuie,
Dumbarton
WDC TBC 
14.3   WDC operates a very popular “Buy Back” scheme whereby the Council can re -
purchase vacant homes which are on the market, to help meet strategic
housing objectives.     The SHIP proposes an annual quota of 35 properties at a
minimum £50K AHSP support rate, giving a spend of £1.75m each year on the
Buy Back scheme, or £8.75m over the five-year period.  Similarly, the Rental Off
the Shelf (ROTS) scheme will deliver 47 homes at a cost of £2.3m over the plan
period. 
14.4  Excluding the reserve projects, the SHIP shows the delivery of around 649
additional rented homes over the 5-year plan period. The delivery of this
ambitious plan will depend upon the ongoing support of our developing RSL
partners and generous funding from the Scottish Government.  
Page 112

Page 113

14.5  Our most recent cost monitoring exercise carried out with the Scottish
Government indicated that the funding required to deliver the committed and
priority projects over the five years of this programme to 2030/31 is currently
estimated to be £51.57m.  This compares with an estimated Resource Planning
Target of £30.63m for the same period, though we expect this figure to rise
when details of the multi-year funding are announced.  It is normal to over-
programme the SHIP to account for fluctuations in the programme.   Given the
current unknowns about the projects and the funding, the programme is
heavily weighted towards the early years of the plan period and will be subject
to continuous adjustment.     
14.6  All projects contained in this SHIP are for social rent, alternative tenure options
such as Shared Equity/ Mid-Market Rent will be Caledonia HA have recently
converted a proposed shared equity scheme at Dalquhurn back to social rent
due to concerns over its viability. 
14.7   Due to continuing uncertainties over details of some of the proposed projects
in the SHIP and the availability of funding, the SHIP will require to show
flexibility and be subject to continual monitoring.  Monitoring will be carried
out through the Council’s performance management system and through key
structures such as the More Homes Delivery Group, the Strategic Housing
Providers Forum, Housing Improvement Board and programme review
meetings with the Scottish Government.   
14.8   The Council has carried out an analysis of potential projects against an
objective Prioritisation Scoring Matrix and assessed them accordingly.    A
number of factors are taken into account including availability of land, type of
housing being proposed, compliance with LHS objectives, deliverability and
value for money. This analysis has informed this SHIP. 
14.9   The SHIP scoring matrix contains a longer list of projects which have been
brought forward for consideration. These are considered to be reserve
projects. If there is slippage, or if additional funding becomes available, some
of these projects may be introduced into the programme.  We remain open to
consideration of other projects which may be presented during the course of
this plan period. 
15.   Construction Methodology and Procurement 
15.1 Most of the new builds proposed in the SHIP will be delivered through MMC
methodology, as have most projects during recent years.  We work closely with
our construction company partners to consider the most efficient way of
delivering our programme. 
Page 113

Page 114

15.2 Unfortunately, one company known for this approach, Modular Connect, went
into liquidation mid-contract delaying the completion of our Gilmour Avenue
project.  Luckily, this project was a small one and it is now nearing completion
with an alternative builder. 
15.3   Table 5 at 14.1 above showing the priority projects for the SHIP gives an
indication of the method of construction employed for each project where
known.   
16.   Purchase of Existing Homes through Buyback and ROTS Schemes 
16.1   The Council’s buyback and RSL Rental of the Shelf (ROTS) schemes are vital
measures in increasing the supply of affordable homes across West
Dunbartonshire.   They can supplement the stock generally, contribute to
addressing the housing emergency and help address the historic shortage of
larger family homes. 
16.2   We are placing an increasing emphasis on purchasing larger family home of 4
and more bedrooms, although these are less frequently on the market. 
16.3 There is strong collaboration between the Lead Officer Empty Homes and the
Empty Homes Officer, with the latter recommending for purchase suitable
properties coming to their attention. 
16.4   The table below summarises the Council’s buyback delivery over the last three
years. 
Table 7:  WDC Buybacks 2022/23 – 2024/25 
Year  Total Homeless
Allocations
Homeless
Children
Housed
4bedroom
and above
Direct Referral by
Empty Homes
Officer
2022/23 16 5 5 0 3
2023/24 35 21 21 10 5
2024/25 33 17 17 4 4 
16.5   Two RSLs in West Dunbartonshire, Knowes and Dalmuir Park, are now taking
part in the ROTS scheme.  We encourage others to do likewise.  We know that
most of the RSL acquisitions coming through this route are being allocated via
Section 5 referrals, an outcome helpful in addressing the homelessness crisis.
Numbers for anticipated acquisitions during the period of the SHIP are shown
in Table 3 above.   We remain open to conversations with RSLs on how ROTS
acquisitions can be increased to meet strategic priorities. 
17.  Gypsy/Traveller Sites 
Page 114

Page 115

17.1   The WDC gypsy/traveller site at Dennystoun Forge, Dumbarton features in the
SHIP as a priority project, with a site start due to take place in 2026/27. The
project will see the provision of new chalet accommodation to replace the
unsatisfactory arrangements currently in place.   
17.2   WDC welcomes to the mainstreaming of projects of this nature under the
AHSP and appreciates the new guidance on the details of how funding will be
applied in such projects.  It is recognised that there are significant differences
from mainstream projects, and this is reflected in the guidance, not least in
respect of Scottish Government grant support for decanting costs. 
17.3   The regeneration of the Dennystoun Forge has been scored a high priority for
this SHIP, with a proposed site start during 2026/27. This project has been the
subject of intensive consultation with the gypsy/traveller community, with the
helpful involvement of MECOPP, the charity in the forefront of helping gypsy
/traveller communities achieve quality of life improvements.   
17.4   There are currently no transit sites within West Dunbartonshire. With a view to
informing the forthcoming Local Development Plan, engagement has taken
place with the resident gypsy/traveller community on the need for such
provision, and it may be the case that funding will be sought for this purpose at
a future date. 
18.  Key Worker Housing Projects 
18.1 There are no projects currently identified specifically for housing key workers.  
However, we are aware that consideration may be given to expansion of the
Jubilee Hospital in Clydebank which could create future demand for such a
project.   Projects of this nature may be suited to intermediate /MMR products. 
18.2 West Dunbartonshire Council has not sought to access the Scottish
Government’s Affordable Rural Homes for Key Workers Fund in relation to the
small part of the authority where this might be eligible.  We would give this
consideration if any opportunities arose to improve affordable housing options
for key workers. 
19. Consultation 
19.1 This SHIP has been prepared in consultation with all RSLs operating in West
Dunbartonshire who were approached with a “call for sites” for consideration
for inclusion in the programme. 
19.2 Consultations with the West Dunbartonshire Council Tenants and Residents
Organisation (WDTRO,) including a presentation to their Board in October 2025,
have evidenced their backing for the Plan.  The Council’s More Homes West
Dunbartonshire approach has evidenced strong support from council tenants
and was recently highlighted as one of the two key future spending priority areas
Page 115

Page 116

for tenants through the comprehensive tenant satisfaction survey undertaken in
late 2024.   
19.3 The SHIP was the subject of a discussion at the Strategic Housing Providers
Forum and subsequent individual meetings took place with potential
developing associations in conjunction with the Scottish Government More
Homes Division. 
19.4 The Scottish Government’s More Homes Division, Glasgow and Clyde Team
were involved throughout in the preparation of this SHIP. 
20.  Vacant and Derelict Infrastructure Fund/Regeneration Capital Grant Fund 
20.1   The Regeneration Capital Grant Fund (RCGF) streamlines the funding
previously delivered through the Vacant and Derelict Investment Programme
(VDLIP) and RCGF through a single fund to support place-based community-led
regeneration 
20.2   Housing and Planning in West Dunbartonshire work together to maximise
access to infrastructure grants to enable new housing development.   We were
successful in attracting almost £1m from the RCGF which allowed our new
build at Pappert to go ahead, overcoming considerable topographical
difficulties.   
21.  Empty and Second Homes Actions 
21.1 The West Dunbartonshire Empty Homes Strategy 2024 – 2029 was published in
November 2024.    It contains an action plan outlining the key measures being
taken to bring vacant homes into use, including one on the close working
arrangement between the Empty Homes Officer and the Buy Back Lead Officer,
for example in identifying homes suitable for acquisition for affordable
housing, with a total of 12 purchased by WDC over the last 3 years. 
21.2   As well as bringing empty homes back into use and contributing to addressing
housing needs, communities across West Dunbartonshire have seen the
benefits brought about by the work done through this strategy, particularly
where long-term blights on their neighbourhoods have been resolved.  The
table below shows the numbers brought back into use over the last three
years, and the time they had lain vacant. 
Table 8: Empty Homes Brought Back into Use 2022/23 – 2024/25
Year  Total 6-12
months
1-2 years 2-5 years 5-10 years 10years+
2022/23 25 0 8 10 6 1
2023/24 28 0 3 13 9 3
Page 116

Page 117

2024/25 29 0 8 10 8 3
Total 82 0 19 33 23 7 
21.3   The Empty Homes Officer also works with RSLs across West Dunbartonshire to
assist their efforts to bring vacant properties back into use. 
21.4   Additional council tax income raised from empty, and second homes is
currently not ring-fenced to support the provision of affordable housing. 
22.    Developer Contributions   
22.1 The Council does not apply S75 arrangements with new housing developers but
instead allocates housing sites by tenure, seeking to achieve an appropriate
balance.  Consequently, there are no Developer Contributions providing
support to the programme. It is proposed that this position will be reviewed as
part of the new LDP preparation. 
23.     Constraints to Delivery 
23.1   Scottish Government guidance indicates that SHIPs should have an emphasis
on deliverability.   In preparing the SHIP, every effort has been made to take
account of any constraints that may affect the delivery of the projects, and this
is taken account of in the assessment scoring. 
23.2   A number of the projects contained in this SHIP are at the early stage of their
development and the full issues/constraints are not known at this stage.  For
example, a number of the projects contained within the SHIP are not at the
stage of having Planning consent. 
24.   Local Authority Assistance in the Delivery of the SHIP 
24.1 The Council is committed to assist where possible in the delivery of the SHIP
projects within the context of the More Homes West Dunbartonshire initiative
as outlined in the Local Housing Strategy.   
24.2 Within the Council, the officers’ More Homes Project Board monitors the
delivery of the new council home element of the programme and will continue
to seek to identify additional sites to extend the Council’s new build
programme, supported by prudential borrowing, the AHSP and the Council’s
rent pooling strengths.  The Council’s element of the programme will be carried
out in-house by our Housing Service, with the assistance of Corporate
Procurement, demonstrating efficiency and best value in the process.   
Page 117

Page 118

24.3 Vacant sites in the Housing Revenue Account, or areas of surplus stock, will
generally be available to support the development of social rented housing.  
The Council has identified a series of Strategic Development sites including
former school sites, some of which will be made available for affordable
housing projects.  Housing will continue work closely with Planning colleagues
to ensure an adequate supply of development land to meet the increased
targets within the context of the Local Development Plan and Housing Land
Audit.   In particular, we will engage with Planning colleagues over the housing
content of the forthcoming new LDP which is scheduled to be adopted in 2028. 
25.    Energy Efficiency, Environmental Standards and Sustainability   
25.1  Local Authorities are among a wide range of public bodies required to meet
the duties place on them by the Climate Change (Scotland) Act 2009.1    In this
context, developments arising from the SHIP must take account of the change
agenda.  New Build developments must contribute to the Single Outcome
Agreement local outcome commitment to reduce fuel poverty. 
25.2  The Council has introduced a pioneering a new higher standard for Council and
Housing Association homes being built in West Dunbartonshire.  The West
Dunbartonshire Design Standard applies to all new build projects being
supported by the Affordable Housing Supply Programme and requires these
homes to meet a higher standard than the statutory minimum.  New homes
constructed under this scheme will achieve at least an Energy Efficiency Rating
of B and an Environmental Impact Rating of B.   As well as improving energy
efficiency, the policy will encourage better external design and internal space
standards. The Design Standard was shortlisted for the prestigious Chartered
Institute of Housing (Scotland) 2016 National Good Practice Excellence Awards
in the category “Excellence in Housing Innovation”.  The West Dunbartonshire
Design Standard will be reviewed in 2026 with a view to improving the
standard of new affordable housing still further. 
25.3   West Dunbartonshire Council is part of Scotland’s Housing Network, a
benchmarking and practice exchange organisation covering over 120 local
authorities and RSLs across Scotland, representing almost 90% of the sector’s
stock.  We are engaged with the work the SHN is doing, in partnership with the
Scottish Government, on a housing development performance framework for
benchmarking of new build projects.   
25.4  The Council continues to encourage the consideration of district heating
systems or other innovative measures which contribute to meeting climate
change objectives.  For example, the new homes at Queens Quay benefit from
the ambitious district heating scheme forming a part of the Clydebank
waterfront development.   
26. Equalities Issues 
Page 118

Page 119

26.1 West Dunbartonshire Council is committed to delivering good quality services
which are underpinned by a clear understanding of Equality and Diversity and
to promoting and sustaining equality and inclusion, and equality and diversity
principles. 
26.2 An integrated Equalities impact assessment was carried out which predicted
that the Local Housing Strategy would have an overwhelmingly positive
impact. 
27. Strategic Environmental Assessment 
27.1   A Strategic Environmental Assessment (SEA) pre-screening report has been
carried out in respect of the parent Local Housing Strategy.  The Council has
determined that a SEA is not required in this instance. 
28.   Monitoring 
29.1 Monitoring of progress will be carried out through the Council’s performance
management system and through key structures such as the Housing Providers
Forum, the Housing Improvement Board, the More Homes Project Board and
programme review meetings with the Scottish Government.   A new SHIP will
be submitted annually to the Scottish Government each October and will be
the subject of a report to the Housing and Communities Committee. 
Page 119

Page 120

Page 120

Page 121

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 19th November 2025
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme
1. Purpose
1.1      This purpose of this report is to provide the Housing and Communities
Committee an update on progress with West Dunbartonshire’s More Homes
Programme which oversees the delivery of the Council’s new home building
programme.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach,
including: -
a. Site starts at the Bonhill Gap site development (Campbell
Street/Braehead), Bank Street and Queen Mary Avenue;
b. The formal completions of 133 new homes for social rent in 2025/26 to
date which has led to 117 children being taken out of a homeless
environment and;
c. amendments to the handover dates of the Gilmour Avenue and Willox
Park Phase 1 projects;
(ii) Recognises the significant achievement of the Clydebank East new build
regeneration project which was awarded the Affordable Housing
Development of the Year Award in the Herald Property Awards in
September 2025;
(iii) Note the continued temporary suspension of letting activity at Young
Street sheltered housing complex until the consultation exercise is
completed regarding future housing provision at Young Street/West
Thomson Street
3. Background
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which has successfully delivered over one thousand new affordable homes in                  
ITEM 11
Page 121

Page 122

West Dunbartonshire and includes the Council’s own new home building
programme.
3.2 The Strategic Housing Investment Plan (SHIP) 2025-2030, outlining West   
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach was approved by the Housing and
Communities Committee in November 2024. The SHIP outline plans to
contribute to meet the Council Administration’s aim of delivering 2500 new
affordable and social rented homes over the 10-year period 2022-2032.  A
new SHIP will be presented to the Housing and Communities Committee in
November for approval which will build on the previous plan.
4. Main Issues
More Homes West Dunbartonshire - Delivery Programme
4.1 Building new affordable homes has an important role to play in revitalising
local economies and assisting with post-pandemic and economic recovery
plans, negating the impacts of the current cost of living crisis and combatting
poverty principally child and fuel poverty.  It is also clear that the need for
affordable homes has and will increase in the current ongoing economic
environment.
4.2 The delivery of new affordable homes has a key role to play in revitalising
local economies and assisting with wider economic recovery plans, negating
the impacts of the current cost of living crisis and combatting poverty,
principally child and fuel poverty. It is also clear that the need for affordable
homes has and will increase in the current ongoing economic environment
both in a local and national context.
4.3 In July 2025, Shelter published its study The Social Value of New Social
Housing in Scotland which calculated that each new social home in Scotland
can generate on average £11,639 in social value within just six months of a
tenant moving in. This figure includes a £990.44 saving to the public purse
and £10,648 in wellbeing value to the tenant, who benefits from improved
opportunities such as securing employment, better health, transport
connections, and reduced housing costs, thanks to a new social home.  The
research report’s key conclusion is that it has shown that new social housing
is driving improvements in social, economic and health outcomes for its
residents, and where this impact is achieved, there is huge capacity for
significant preventative savings to wider society.
4.4 The Council’s More Homes West Dunbartonshire approach is an ambitious
plan that aims to continue the positive momentum of the delivery of much
needed Council homes in West Dunbartonshire and will significantly assist the
Council’s aim to deliver 2500 new social and affordable homes by 2032.
4.5 As the largest affordable housing developer in West Dunbartonshire, the
Council has identified a number of development sites for new council homes
to address existing and new housing need. The design of these homes
Page 122

Page 123

provides sustainable homes using innovative technology and delivering on our
low carbon ambitions including Passivhaus and other net zero carbon
opportunities.  We anticipate the new homes delivered by the Council will
have a minimum lifespan of 100 years.
4.6 The Council’s More Homes West Dunbartonshire approach has evidenced
strong support from council tenants and was recently highlighted as one of the
top two key future spending priority areas for tenants through the
comprehensive tenant satisfaction survey reported to the Housing and
Communities Committee in February 2025.
4.7 In September 2025, the Council’s major housing led regeneration project
which overseen the development of 88 new council homes at Clydebank East
was awarded the prestigious Herald Property Awards - Affordable Housing
Development of the Year Award recognising this high-quality housing
development.  This development is also a finalist in the Scottish Housing
Awards 2025 in the Excellence in Regeneration and Sustainability category.
4.8 The Strategic Housing Investment Plan and HRA Capital Plan outlined the
plans the Council have for meeting their new build ambitions.  An update on
each development site is provided below: -
Pappert, Bonhill
This development has now completed and has delivered 26 net zero homes
for affordable social rent in the Bonhill area -
House Type Sustainability Standard Number of New
Homes
House 3bed/5 person Passivhaus 6
House 3bed/5 person Net Zero 6
House 4bed/6person Net Zero 4
House 4bed/7person Net Zero 1
Flat 2bed/3person w/c Net Zero 3
Flat 1 bed/2person Net Zero 6
The practical completion was 6th June 2025, and the project has been
selected as finalist in the Scottish Housing Awards in the Net Zero in Housing
category.
Mount Pleasant, Old Kilpatrick
The 19-unit development, which is designed for elderly residents and delivers
high quality amenity housing, completed ahead of schedule in Spring 2025.
The housing mix is outlined below for information:
Page 123

Page 124

This project has been selected as a finalist in the Scottish Housing Awards in
the Excellence in health and wellbeing category.
The three most recent new home developments completed highlighted above
have significantly contributed to meeting housing need within West
Dunbartonshire communities and combined have contributed to lifting 117
children out of homelessness and into a secure tenancy. 
Willox Park Phase 1/2, Doveholm, Dumbarton
The Phase 1 development of seventeen new homes for the elderly at a former
care home site will comprise of the housing mix below.
House Type Sustainability Standard Number of New
Homes
Flat 2bed/3person Net Zero 2
Flat 1 bed/2person Net Zero 15
This will be our first project using a ground source heat network to deliver heat
and hot water.
Current tenants at Willox Park have been consulted throughout the design
process and this has continued with the contractor holding Q&A sessions. 
We are currently working to make sure the process of moving into the new
facility is as easy and streamlined as possible. The units have all been
allocated.
The original move to the new facility was planned for 30th November 2025.
Unfortunately, there has been a delay in the programme due to issues with
the fabrication of the steel balconies for the new homes. As such, the new
completion date is 29th January 2026.  The tenants have received
communications on the delay which is longer due to the construction
Christmas closedown.
In terms of the Phase 2 programme feasibility studies for the site have
confirmed an optimum site capacity of 21 new homes and the design and
build contract will also include the demolition of the existing homes following
completion of Phase 1. Phase 2 is part of the wider housing regeneration
plans for the Willox Park area and priority to the new homes in Phase 2 will be
given to the tenants within Phase 1 in the first instance.
House Type Sustainability Standard Number of New
Homes
Bungalow 1bed/2person Net Zero 3
Flat 1bed/2person w/c Net Zero 4
Flat 1bed/2person Net Zero 4
Flat 2bed/4person Net Zero 8
Page 124

Page 125

Bonhill Gap Site Strategy
The 28 units of housing at Braehead (17) and Campbell Street (11) went on
site in August 2025 and is scheduled to complete within a 56-week period.
The new tender for the O’Hare project (6 units) was returned on 30th October.
The evaluation process is ongoing to appoint the main contractor for these six
homes.  The housing mix of the full Bonhill Gap Site development programme
is highlighted in the table below and will include 8 large family homes to meet
the key identified need: -
House Size Sustainability Standard Number of New
Homes
1bed wheelchair Net Zero 4
1 bed general needs Net Zero 16
2 bed wheelchair Net Zero 3
3 bed general needs Net Zero 3
4 bed general needs Net Zero 2
5 bed general needs Net Zero 4
7 bed general needs Net Zero 2
Bank Street, Alexandria
The development will consist of twenty-two sheltered/amenity housing units in
partnership with the HSCP. A site start was achieved in October 2025 and is
scheduled for completion in January 2027.
House Type Sustainability Standard Number of New
Homes
Flat 1bed/2person w/c Net Zero 22
Communal Room Net Zero 1
Staff Office Net Zero 1
As reported to the August Housing and Communities Committee the tender
return was some £2.4m below the initial estimated cost.  This development as
with the development at Willox Park, involved the existing tenants at Gray
Street who have been consulted throughout the design process and will be
assisted to make the transition as smooth as possible.
The Council is currently undertaking feasibility studies in terms of future
options for Gray Street, Alexandria and will provide an update to the Housing
and Communities Committee in February 2026.
West Thomson Street (former Clydebank Health Centre)
Demolition of the former Clydebank health centre building was completed in
late 2024.
Page 125

Page 126

The proposed development will provide 42 new homes - 15 units of family
housing and 27, fully accessible, sheltered/amenity homes for the elderly. The
proposed housing mix is noted below: -
House Type Bed Number WCH
Sheltered/Amenity
Flat
1 27 27
Cottage Flat 1 2 2
Duplex Cottage Flat 3 2
House 5 2
House 4 5
House 3 4
Total 42 27
The planning application for this site was submitted 8th October 2025. We are
continuing to temporarily suspend lettings within the Young Street sheltered
housing complex unless in emergency circumstances as we complete the
consultative exercise which will see the sheltered/amenity new housing
provision potentially as replacement housing for the existing Young Street
tenants.
Consultation with the residents is on-going. We have held 4 consultation
meetings with the residents, including visiting with the residents and their
families who were unable to attend previous meetings. The consultative
phase will continue throughout the planning process, and the Young Street
tenants will have the opportunity to visit the Willox Park Phase 1 homes to
give more informed feedback of a potential new homes within this
development.
Gilmour Avenue, Hardgate
The development started on site on 23rd September 2024. Following the
administration of the initial contractor (Connect Modular), CCG were
appointed to complete the 2x 3-bedroom homes. However, due to issues with
utilities companies delaying the programme, the new homes will not be
handed over until 24th November 2025 from 30th October.
Dennystoun Forge Gypsy/Traveller Site
The project has been scored and assessed as a priority in the new SHIP, with
a proposed site start next financial year 2026/27. Our in-house design team
and procurement colleagues are proceeding to detail our plans, and
discussions are taking place with other council service areas in terms of
assessing potential decant location options to allow the works to the existing
site to commence.
Regular engagement continues with the Dennystoun Forge community
through monthly engagement meetings. The community are supported by
Minority Ethnic Carers of People Project (MECOPP) including representation
Page 126

Page 127

by the charity at these engagement sessions. The regular engagement has
been welcomed by the community and has with dedicated staff resource led
to a strong collaborative focus on the delivery of the new accommodation.
Our focus remains on identifying suitable decant options and on what type of
chalet will be chosen for the final design. We are consulting on to what extent
home design can be customised to meet individual needs.
The Scottish Government has now issued guidance on how these projects will
be funded through the Affordable Housing Supply Programme for 2026/27,
and this will influence our discussions going forward.
Queen Mary Avenue, Clydebank (Clydebank Gap Sites)
This development proposes 17 new units on the now demolished Queen Mary
Day Centres in Drumry which was acquired from the Council’s General Fund
at market value. 
House Type Sustainability Standard Number of New
Homes
1 bed/2 person  Cottage Flat Net Zero 10
2 bed/3 person WCH Cottage Flat Net Zero 1
3 bed/4 person Cottage Flat Net Zero 1
3 bedroom terraced house Net Zero 3
4 bedroom semi-detached Net Zero 2
The Council’s appointed main contractor has undertaken the design stage for
this site and successfully initiated a site start on the 20th October with a
planned programme of 61 weeks. This start date is only one year and one
month after the demolition highlighting the success of the procurement and
design strategy for this project and the ability to deliver at pace within the
context of the current housing emergency.
Dumbuie Avenue and Smollett Road (Silverton Regeneration)
The council have been assembling this site for over 10 years, following
structural issues with the previous properties located within the sites which
were demolished in November 2024.  Our proposed housing mix across both
sites:
Dumbuie Avenue
2 x 3 bed semi=detached
2 x 4 bed semi-detached
2 x 1 bed wheelchair bungalow
Smollett Road
3 terrace properties
2 x 4 bed
1 3 bed
Page 127

Page 128

Following approval from the Housing and Communities Committee to direct
award a design and build contract to deliver the Silverton regeneration project
up to the budgeted costs for project (Dumbuie Avenue and Smollett Road),
the project is now included within the draft Council’s Strategic Housing
Investment Plan 2026/27-2031/32 which is submitted for approval at the
Housing and Communities Committee of 19th November 2025.
Buyback Programme
Total number of properties purchased in 2025/26 financial year 20
Total Purchase Value                         £1,650,000
PROPERTY SIZE PURCHASED
6 apt 0
5 apt 2
4 apt 8
3 apt 2
2 apt 8
There are currently 6 properties under offer, of which 5 are three bedroom or
more homes to meet housing need in West Dunbartonshire.
4.9 In 2024/25 the Council’s Annual Resource Planning Assumption (RPA) from
the Scottish Government supporting the delivery of the SHIP was reduced to
£8.167m which represented a cut of around 24%.  However, for 2025/26 the
RPA was increased to a minimum of £11,053m. This has been further
increased to £11.386m following the awarding of an additional £333k in
2025/26 for acquisitions to accelerate children moving out of temporary
accommodation environments. Council Officers are currently participating in
positive discussions with the Scottish Government’s More Homes team to
further increase the RPA for 2025/26 and members will be advised of the
outcome of these discussions before the end of this calendar year.
4.10 The announcement of the additional £333k funding to West Dunbartonshire
from the additional £40m national increased allocation was part of the Scottish
Government’s Housing Emergency Action Plan announcements published in
September 2025 which set out a range of new enhanced and accelerated
actions to tackle the national housing emergency.  The plan is structured
through three pillars highlighted below: -
 Ending children living in unsuitable accommodation as a vital part of
the Scottish Government’s determination to end child poverty;
 Supporting the needs of vulnerable communities, and;
 Building our future – maximising investment in Scotland’s housing
sector
4.11 Positively the plan committed to a £4.9bn investment over the next four years
for the delivery of new homes, this will see an increased RPA allocation for all
Page 128

Page 129

Scottish local authorities and the welcome introduction of multiyear funding
allocations to strengthen the delivery of strategic housing investment plans.
Once the Scottish Government makes formal announcements on this aspect
of the Action Plan, such as the increased funding and how this will be
distributed to local authorities, the Council will review the programme with a
focus on maximising investment opportunities and ensuring the delivery of
affordable housing continues to meet the needs of West Dunbartonshire’s
communities.
4.12 The Housing Service are continuously looking for opportunities to provide
additional new build council homes and will bring any potential site to the
Housing and Communities Committee with as much information as possible
as part of the regular More Homes update paper.
5. People Implications
5.1 The delivery of the More Homes delivery programme is managed through
existing resource within the Housing Development & Homelessness team
funded from the Housing Capital Investment Programme. 
6. Financial and Procurement Implications
Financial
6.1 The Council has to date delivered 584 new homes for social rent; these
additional homes bring council tax revenue of around £810k per year to West
Dunbartonshire Council.
6.2 On 5 March 2025 supported by tenant representatives the Council approved
the Housing Capital Programme 2025-2030 which saw appropriate resources
committed to the delivery of new council homes in West Dunbartonshire.  A
net expenditure budget of £69m for the affordable housing supply programme
inclusive of acquisitions is factored into the 5-year HRA Capital Programme. 
As it currently stands, it is anticipated that this programme will complete within
project life budget.
6.3 Housing and Finance Officers will continue to assess the ongoing affordability
of future developments within the context of the Housing Revenue Account
Business Plan.
Procurement
6.4 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted within 4.8 of this report will
continue to be prioritised. Where the contract award is less than £213,000,
authority is delegated to the Chief Officer in consultation with the Procurement
Manager to instruct the award of contracts for the planned revenue and
capital spend detailed in this report to suppliers providing the most
economically advantageous offer to the Council.
Page 129

Page 130

6.5 All procurement activity conducted by the Council more than £2m is.
subject to a contract strategy. The contract strategy for new housing
development within the HRA Capital Programme will be developed by the
Corporate Procurement Unit in consultation with Housing Development
Officers. The contract strategy will include but is not limited to; contract scope,
service forward plan, the market, procurement model, and routes – including
existing delivery vehicles, roles and responsibilities, risks, issues and
opportunities and on-going contract management. Opportunities to maximise
the positive social, economic, and environmental impact for the Council
through the relevant procurement processes will be developed in line with
procurement policy.
7. Risk Analysis
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis.
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel.
7.3 Housing supply continues to be the key factor in terms of the national and
local housing emergencies and if not increased and/or demand reduced it will
lead to continued pressures on other Council and Health and Social Care
Partnership service areas such as Homelessness which will have negative
financial implications for the wider Council’s general fund. 
8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
10. Consultation
10.1 As part of a rent consultation exercise, 92% of respondents indicated their
support for the Council’s ambitious plans to deliver the Housing Revenue
Account (HRA) new council house build programme. In addition, there was
Page 130

Page 131

positive support for the wider delivery of new build housing as part of the
current Local Housing Strategy.  Regular updates on new build development
are provided to the West Dunbartonshire Tenants and Residents Organisation
at the bi-monthly liaison meetings.
11. Strategic Assessment
11.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire.
11.2 Having considered all the Council’s strategic priorities, this report, and the
provision of new supply social housing for rent contributes greatly to all the
Council’s strategic priorities.
Peter Barry
Chief Officer, Housing
Date: 5 November 2025
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Mikayla Deeley, Senior Housing Development Officer,
Housing Development and Homelessness Team,
Housing and Employability: email mikayla.deeley@west-
dunbarton.gov.uk
Appendices: None
Background Papers: West Dunbartonshire Council’s Local Housing Strategy
West Dunbartonshire Council’s Strategic Housing
Investment Plan
Local Housing Strategy, Health Inequalities Impact
Assessment
Wards Affected: All
Page 131

Page 132

Page 132

Page 133

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 19 November 2025
___________________________________________________________________
Subject:       Scottish Social Housing Charter Annual Benchmarking and Mid-Year
Progress Report
1. Purpose
1.1 The purpose of this report is to provide members with benchmarking information
relating to 2024/25 and a mid-year update in terms of how the Council’s Housing
and homelessness service is performing against the Scottish Social Housing
Charter indicators and meeting the requirements of the Scottish Housing
Regulator’s Regulatory Framework.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the content of this report recognising how the Council performed
compared to our peers during 2024/25 and mid-year progress in terms of
meeting the outcomes of the Scottish Social Housing Charter.
(ii) Notes that following the approval of our Annual Assurance Statement by the
Committee on 20 August 2025, that this has now been submitted to the
Scottish Housing Regulator as per our regulatory requirement and notes
the progress made in relation to areas of non-compliance highlighted.
(iii) Notes that our annual Charter Performance Report for 2024/25 has now
been published and a summary will be provided to all tenants with the
winter edition of the Housing News, and
(iv) Agrees that a full annual progress report on the Scottish Social Housing
Charter and Regulatory Framework inclusive of the Council’s Annual
Assurance Statement will be submitted to the August 2026 meeting of the
Housing and Communities Committee.
3. Background
3.1 The Scottish Government’s first Scottish Social Housing Charter came into force in
April 2012. This was reviewed during 2016 and again in 2021 and the resulting
revised Charter was approved by the Scottish Parliament and has effect from 1
November 2022.
3.2 The purpose of the Charter is to help improve the quality and value of the
services that social landlords provide by:
ITEM 12
Page 133

Page 134

 Stating clearly what tenants and other customers can expect from social
landlords and helping them to hold landlords to account,
 Focusing the efforts of social landlords on achieving outcomes that matter to
their customers, and
 Providing the basis for the Scottish Housing Regulator to assess and report
on how well landlords are performing.
3.3 The Scottish Housing Regulator published a revised Regulatory Framework and
associated statutory guidance for social landlords in February 2024 which has
effect from 1 April 2024, and the reporting timetable is outlined below:
When Who What
Throughout year
Housing Improvement
Board/Tenant
Representatives
Assess performance against the Charter
Outcomes
May each year Housing Development Submission of Annual Return on the Charter
(ARC) to the Scottish Housing Regulator
August each
year
Scottish Housing
Regulator
Publish a report about each social landlord with
key data from its ARC on their website
October each
year
Convener of Housing
and Communities
Committee
Submission of Annual Assurance Statement
(AAS) to the Scottish Housing Regulator
October each
year Housing Development Publication of annual Charter Performance
Report for tenants and other customers
by April each
year
Scottish Housing
Regulator
Publish an Engagement Plan for each landlord,
highlighting areas where they are seeking further
assurance, based on performance against
Charter Indicators and outcomes and
compliance with statutory obligations
by April each
year
Scottish Housing
Regulator
Publish a report on the analysis of the sectors’
performance in achieving the Charter Outcomes
3.4 On the 6 August 2014, Members of the Housing and Communities Committee
agreed that twice yearly reports be provided as follows:
 August Committee - Scottish Social Housing Charter Annual Update Report, and
 November Committee - Scottish Social Housing Charter Annual Benchmarking
Report and Mid-Year Progress Report (April-September).
4. Main Issues
4.1 A report to the August 2025 meeting of the Housing and Communities
Committee outlined the content of our current Engagement Plan published by the
Regulator in April 2025, detailed 2024/25 performance compared to the previous
year and against annual targets set and highlighted key areas of concern that
would be monitored closely by the Housing Improvement Board, within the
context of the Housing Emergency declared by the Council in May 2024.
4.2 This report also sought approval for our Annual Assurance Statement which was
approved by the Committee and has subsequently been submitted to the
Scottish Housing Regulator within the timescale outlined in the Regulatory
Framework.
Page 134

Page 135

4.3 The key areas of focus in relation to the Scottish Social Housing Charter and
Regulatory Framework highlighted in this report are as follows:
 Annual benchmarking data based on data published by the Scottish Housing
Regulator at the end of August 2025.
 Mid-year progress against key measures of performance in relation to
achieving the Charter Outcomes.
 An update in terms of the progress made in the areas of non-compliance
highlighted in our Annual Assurance Statement.
 The production and publication of our annual Charter Performance Report for
tenants and other customers.
 The continued development of effective tenant scrutiny arrangements in
conjunction with tenants and other customers.
Benchmarking of key performance indicators
4.4 The Scottish Housing Regulator currently uses 32 Charter Performance Indicators to
monitor the performance of all social landlords against the Charter outcomes and
standards. 
4.5 Both our Annual Return on the Charter and annual performance information
submitted to Scotland’s Housing Network provide opportunities to compare our
performance against other landlords and to identify areas for improvement. This
process is known as “benchmarking”.
4.6 The Regulator publishes a Landlord Report for every social landlord in Scotland on
their website by the end of August each year. This report contains key data from
the Annual Return on the Charter (18 key indicators) and compares our
performance with a Scottish average figure inclusive of all housing providers.
4.7 Our most recent Landlord Report and a PowerPoint report providing more detailed
benchmarking and trend information are, provided as background papers to this
report.
4.8 Key findings from the benchmarking data available are outlined below:
Status Key
Peer group compared to is all other
local authority landlords, as well as
Wheatley Homes Glasgow.
Top
quartile
2nd
quartile
3rd
quartile
4th
quartile
Communication 2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
Average time in working days to
respond to a Stage 1 complaint
10.36
days
5.98
days
6.84
days
Average time in working days to
respond to a Stage 2 complaint
34.9
days
22.8
days
24.0
days
Page 135

Page 136

Customer Satisfaction 2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
% of tenants satisfied with the overall
service 61.3% 61.3% 87.0%
% of tenants who feel their landlord is
good at keeping them informed about
their services
75.8% 75.8% 86.8%
% of tenants satisfied with the
opportunities given to participate in
decision making
69.2% 69.2% 87.2%
% of tenants who feel that the rent
represents good value for money 60.5% 60.5% 85.6%
Quality of Housing 2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
% of properties meeting the Scottish
Housing Quality Standard 32.2% 51.2% 69.8%
% of existing tenants satisfied with
the quality of their home 62.7% 62.7% 87.8%
Repairs, Maintenance and
Improvements
2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
Average length of time taken to
complete emergency repairs
4.5
hours
5.1
hours
5.1
hours
Average length of time taken to
complete non-emergency repairs
9.31
days
10.94
days
12.16
days
% of reactive repairs carried out
completed right first time 85.7% 85.6% 85.9%
How many times in the reporting
period did you not complete a gas
safety check within 12 months
0 0 0
% of tenants satisfied with the repairs
and maintenance service 83.7% 94.8% 88.3%
Neighbourhood and Community 2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
% of tenants satisfied with the
management of the neighbourhood
they live in
62.7% 62.7% 86.0%
% of tenancy offers refused 51.7% 46.6% 42.5%
% of anti-social behaviour cases
resolved 97.1% 98.1% 96.6%
% housed who maintained their
tenancy for at least 12 months 94.1% 92.8% 91.9%
The average time to complete
applications for medical adaptations
73.0
days
45.4
days
46.5
days
Page 136

Page 137

4.9 The table below provides a more local analysis comparing West Dunbartonshire
Council’s performance against comparable neighbouring housing organisations
(3 neighbouring local authorities Renfrewshire, East Dunbartonshire and Stirling
and River Clyde Homes operating in Inverclyde).
West
Dunbartonshire
Council
East
Dunbartonshire
Council
Renfrewshire
Council
Stirling
Council
River Clyde
Homes
HOMES AND RENT
Total Number of Homes
10,547 3,864 12,078 6,090 6,093
Rent increase
8.0% 4.0% 7.5% 7.2% 5.0%
Homeless People 2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
% of applications where household
has experienced rough sleeping the
night before presentation
3.3% 3% 3%
Households assessed as homeless
per 10,000 of households* 238 235 208
% of all homeless cases re-assessed
within 12 months (repeat homeless) 4.4% 4.3% 4.5%
Average time in days from
application to assessment 13 12 13
Households in temporary
accommodation per 10,000 of
households*
68 62 62
Average total time (days) spent in
temporary accommodation for cases
that closed
172 177 158
Average time in days from homeless
assessment to case closure 189 175 182
Value for Money 2022/23
Value
2023/24
Value
2024/25
Value
2022/23
Rank
2023/24
Rank
2024/25
Rank
Average time to re-let properties 33.6
days
34.99
days
25.9
days
Void rent loss expressed as a % of
the total amount of rent due 1.28% 1.01% 0.85%
Rent collected as a % of total rent
due 98.50% 99.09% 99.58%
Gross rent arrears as % of total rent
due 10.00% 9.44% 8.81%
Page 137

Page 138

West
Dunbartonshire
Council
East
Dunbartonshire
Council
Renfrewshire
Council
Stirling
Council
River Clyde
Homes
QUALITY AND MAINTENANCE OF HOMES
% of homes meeting the SHQS
69.8% 58.9% 80.0% 55.7% 85.0%
Average length of time taken to complete emergency repairs
5.1 hours 3.8 hours 5.2 hours 3.5 hours 4.1 hours
Average length of time taken to complete non-emergency repairs
12.2 days 11.4 days 6.9 days 7.0 days 23.3 days
% of reactive repairs carried out completed right first time
85.9% 85.1% 90.1% 92.0% 75.8%
% of tenants who have had repairs carried out on the last 12 months who were
satisfied with repairs and maintenance service
88.3% 88.8% 77.2% 82.5% 92.2%
NEIGHBOURHOODS
% of anti-social behaviour cases resolved
96.6% 21.5% 96.8% 94.1% 91.8%
VALUE FOR MONEY
Rent collected as % of total rent due
99.6% 104.0% 100.8% 103.0% 100.7%
Void rent loss expressed as a % of the total amount of rent due
0.85% 1.0% 1.3% 1.5% 5.9%
Average length of time taken to re-let homes
25.9 days 114.8 days 37.3 days 69.7 days 243.4 days
4.10 Performance improvement targets for 2024/25 for all the Charter Indicators have
been agreed based on robust benchmarking information and previous
performance. These targets challenge the housing service to meet our ambition
to be one of Scotland’s top performing landlord organisations.
Mid-year progress achieving the Charter Outcomes
4.11 Of the 32 Charter Indicators, 11 are reported on a six-monthly basis to the
Housing and Communities Committee, alongside 3 indicators relating to
homelessness (which are not part of the Charter return).
4.12 A summary of performance for the period April 2025 – September 2025 for these
indicators is outlined in the table below:
Page 138

Page 139

Status Key
Target Met or exceeded Target narrowly missed (within
agreed range) Target missed
Quality of housing Mid-year
Target
Mid-year
Value Status
% of properties meeting the Scottish Housing
Quality Standard 78% 75.6%
Repairs, Maintenance and Improvements Mid-year
Target
Mid-year
Value Status
Average length of time taken to complete
emergency repairs 4 hours 4.8 hours
Average length of time taken to complete non-
emergency repairs 9.7 days 12.5 days
% of reactive repairs appointments that were kept 93.6% 91.6%
How many times in the reporting period did you not
complete a gas safety check within 12 months 0 0
% of tenants satisfied with the repairs and
maintenance service 91.8% 87%
Estate Management, Anti-Social Behaviour,
Neighbour Nuisance and Tenancy Disputes
Mid-year
Target
Mid-year
Value Status
% of anti-social behaviour cases resolved 96% 94.4%
Tenancy Sustainability Mid-year
Target
Mid-year
Value Status
% of new tenants who maintained their tenancy for
at least 12 months 93% 91.4%
Homeless People Mid-year
Target
Mid-year
Value Status
% of all homeless cases who received a decision
within 28-day target 95% 98.9%
% of households requiring temporary
accommodation, to whom an offer was made 100% 100%
Breeches of the Unsuitable Accommodation Order 0 0
Value for Money Mid-year
Target
Mid-year
Value Status
Average length of time to re-let homes 25 days 23.5 days
Void rent loss expressed as a % of the total amount
of rent due 0.85% 0.9 %
Gross rent arrears as a % of total rent due 9.3% 9.1%
4.13 Of these 14 key indicators, 6 are meeting the targets set, with another 6 narrowly
missing this target. Overall, this translates to 86% of these key indicators either
meeting or almost achieving target.
Annual Assurance Statement update
4.14 Based on our performance against the Charter Outcomes and the information in
the AAS self-assurance toolkit, the following areas of material non-compliance
were identified and highlighted in our AAS approved by Committee in August
2025
Page 139

Page 140

 Low compliance with the SHQS due to number of properties without a valid
EICR in place.
 Lack of compliance with homelessness duties due to reported breaches of
the Unsuitable Accommodation Order.
 Failure to submit updated data in relation to factored owners’ satisfaction (as
per SHR guidance).
4.15 At the end of August 2025, a total of 8601 of our properties had a valid EICR in
place, which equates to 81.5% of our housing stock. The most recent update
provided to the Better Homes Board projects that by the end of 2025/26 this
figure will have risen to 93.3% and by the end of July 2026 to 99.4%.
4.16 It is expected that properties without an EICR in place at this point, will all be
labelled in abeyance in terms of SHQS compliance, as we will have exhausted
the contact process and been unable to gain access to these properties.
4.17 Despite the significant challenges in terms of homelessness and pressures
around the provision of temporary accommodation, we have not reported any
breaches of the Unsuitable Accommodation Order so far in 2025/26, although
the use of bed and breakfast accommodation did rise significantly.
4.18 The tender for a new satisfaction survey of factored owners has been completed
and contractor appointed. Fieldwork will begin in November 2025 and a report
outlining results is expected in late December 2025 and will be reported to the
Housing and Communities Committee in February 2026 before inclusion in the
Annual Return on the Charter for 2025/26 in May 2026.
Production and publication of Annual Charter Performance Report
4.19 The Scottish Housing Regulator requires all social landlords to produce an
Annual Charter Performance Report for their tenants and other customers no
later than 31 October each year.
4.20 The Regulator states that the report should include:
 An assessment of performance in delivering the Charter Outcomes.
 Relevant comparisons with previous years, other landlords and national
performance, and,
 How and when the landlord intends to address areas for improvement.
4.21 Following the introduction of the Charter and in preparation for our first report,
a working group of tenants and officers was established and successfully
agreed which indicators should feature in the report and the best style and
format to ensure that the report is user friendly and easy to understand.
4.22 Further engagement was conducted with tenant representatives to review and
update the report, in preparation for the revised Charter coming into effect. This
consultation again influenced the style, content, and format of the report and the
update of the Service Standards that are in place across housing services, and
Page 140

Page 141

which are reported regularly to tenants and other service users (via website and
insert with Housing News).
4.23 Our Annual Charter Performance Report for 2024/25 was published online within
the required timescale. The narrative in the report is based on the annual self-
assessment exercise of our performance, and a summary of the report will be
sent to every tenant with the winter edition of the Housing News. The full report
will be sent to tenant groups, members of the WDTRO, members of the Scrutiny
Panel and the Scottish Housing Regulator.
4.24 Following the introduction of revised Charter Indicators by the Scottish Housing
Regulator which came into effect in April 2025, we have committed to engage
with tenant representatives to fully review the content and style of our Annual
Charter Performance Report and the Service Standards that are in place across
Housing Services.
Tenant Scrutiny Arrangements
4.25 The statutory Regulatory Framework for housing and homelessness services
demands that tenants participate in scrutinising landlords’ performance against
the Charter and requires that:
 The form of involvement has been agreed with tenants.
 Involvement is effective and meaningful and that tenants have a real say in
assessment of performance.
 The approach is publicised to tenants, and
 Landlords’ can demonstrate the agreed approach is being implemented.
4.26 Developing effective tenant scrutiny is therefore a challenging process, however
following support from the Scottish Government’s “Stepping Up to Scrutiny”
training programme in which elected members took part, these requirements
were successfully met and in November 2014 the Housing and Communities
Committee approved the establishment of our Tenant Scrutiny Panel with clear
terms of reference.
4.27 The Scrutiny Panel has subsequently carried out the following scrutiny exercises:
 2014/15 looking at our Anti-Social Behaviour Service.
 2015/16 looking at our Repairs Service.
 2016/17 looking at tenancy sustainment, specifically the new tenant visit
process.
 2017/18 looking at SHQS compliance, specifically the number and reasons
that properties were held in abeyance.
 2018/19 looking at the timescales taken to complete medical adaptations.
 2020/21 looking at the complaints process and time taken to respond to
complaints.
 2022/23 looking at new tenant visits, and,
Page 141

Page 142

 2024/25 looking at the processes around reporting repairs.
4.28 All of the recommendations made in the Panel’s eight reports to date were
approved by the Housing Improvement Board and progress in terms of
implementing these are monitored and regular feedback provided to the
Scrutiny Panel.
4.29 At the time of writing the Panel are looking at our latest performance information
and using that to consider the focus of their next scrutiny exercise.
4.30 The work of the Scrutiny Panel has been nationally recognised as finalists in
Scottish Housing Awards through the work that they do to ensure that tenant
scrutiny is a valued part of the Councils approach to performance management.
4.31 The West Dunbartonshire Tenants and Residents Organisation (WDTRO) also
continue to be heavily involved in the scrutiny of the Housing Service and in
June 2025 received national recognition for their work when they were awarded
“Tenant Group of the Year” and “Outstanding Achievement Award” from the
Tenant Participation Advisory Service (TPAS).
4.32 The continuing work of the Joint Rent Group comprising tenants, Council officers
and the Convener of the Housing and Communities Committee, looking at the
rent setting process and the guidance in relation to the Housing Revenue
Account, remains important in ensuring Housing and Homelessness Services
provide best value for current and future tenants.
5. People Implications
5.1 There are no people implications because of this report. Delivery on the
requirements of the Scottish Social Housing Charter and compliance with the
Regulatory Framework is managed from within existing staffing resources.
6. Financial and Procurement Implications
6.1 There are no direct financial or procurement implications in relation to this report.
The improvement plan informed by the Charter self-assessment exercise is being
delivered from within existing budgets.
7. Risk Analysis
7.1 There is a significant risk that failure to respond appropriately to the
requirements of the Scottish Social Housing Charter and the Regulatory
Framework would attract an adverse reaction from the Scottish Housing
Regulator and may have wider consequences for the Council in the context of
Best Value.
7.2 At the time of writing, we expect our next Engagement Plan to be published in
April 2026.
Page 142

Page 143

8. Environmental Sustainability
8.1 The delivery of the council’s housing investment programmes is within the
approved More Homes zero carbon approach. Our current and future approach
to strategic housing asset management will continue to prioritise a ‘zero carbon’
approach to decision making and deliverability and this will be done the aims of
the Housing Asset Management Strategy and the Council’s Climate Change
Strategy.
9. Equalities Impact Assessment (EIA)
9.1 Equalities legislation requires that new or significantly changing policies or
services and financial decisions should be subject to an assessment of their
impact on the wellbeing of certain groups of people. The recommendations
within this report do not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
10. Consultation
10.1 The Council has in place a well-established and proactive tenant and resident’s
organisational structure. The WDTRO meet with the Council (co-chaired by the
Convener of the Housing and Communities Committee) on a bi-monthly basis to
discuss all issues relating to the Housing Service.
10.2 There remains a strong appetite among tenants and customers to continue to
participate actively to improve housing services in West Dunbartonshire. This is
reflected in the successful partnership approach adopted to develop the Charter
Performance Report and the on-going activities of the WDTRO, the Joint Rent
Group the West Dunbartonshire Scrutiny Panel.
10.3 The Council is committed to ensure consultation continues and will support
arrangements to increase tenant scrutiny activities and assess our performance
in line with the requirements under the Scottish Social Housing Charter and the
SHR’s Regulatory Framework.  Our approach was commended via an external
validation exercise by the Tenant Participation Advisory Service (TPAS)
Scotland, who in 2023 again awarded West Dunbartonshire Council, a Gold
Accreditation for excellence in tenant participation.
11. Strategic Assessment
11.1 Having considered the Council's strategic priorities, this report contributes
significantly to all five strategic priorities and specifically to improving local
housing and environmentally sustainable infrastructure.
Peter Barry
Chief Officer, Housing
Date: 5 November 2025
___________________________________________________________________
Page 143

Page 144

Person to Contact:        John Kerr, Housing Development and Homelessness Manager,
Housing Development and Homelessness Team, Housing,
email: john.kerr@west-dunbarton.gov.uk
Stefan Kristmanns, Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing,
email: stefan.kristamanns@west-dunbarton.gov.uk
Appendices: None
Background Papers:     West Dunbartonshire Council’s Engagement Plan, Scottish
Housing Regulator, 31 March 2025
Engagement plan from 1 April 2025 to 31 March 2026 |
Scottish Housing Regulator
Scottish Housing Regulator WDC Landlord Report 2024-25,
August 2025
West Dunbartonshire Council | Scottish Housing Regulator
Scottish Social Housing Charter/Regulation of Social Housing
in Scotland Annual Update,
Report by Chief Officer, Housing,
Housing and Communities Committee, 20 August 2025
West Dunbartonshire Council Performance Analysis Visit,
PowerPoint presentation by Scotland’s Housing Network
September 2025
Annual Charter Performance Report 2024/25
“Involving You to Improve Housing Services” West
Dunbartonshire Council’s Tenant Participation Strategy 2025-
2028.
Tenant participation strategy | West Dunbartonshire Council
Wards Affected:             All    
Page 144

Page 145

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Housing and Employability
Housing and Communities Committee: 19 November 2025
Subject: Former Tenant Rent Arrears Write Off
1.        Purpose
1.1      The purpose of this report is to seek Committee approval for the write-off of
rent arrears for former tenants.
2.        Recommendations
2.1      It is recommended that Committee approves the write off of former tenant
arrears accounts totaling £135,418.22.
3.        Background
3.1      At the Council meeting held on 21st December 2016, Council agreed to
increase Financial Regulation D4 which gives the Chief Officer - Resources
authority to write-off individual debts.  It was agreed to increase this from
£1,000 to £5,000. 
3.2 Individual debts exceeding £5,000 can be written off only with the approval
of Committee.
4.        Main Issues
4.1      When a tenancy ends and there are current tenant arrears of rent
outstanding from the current and previous years a former tenant rent
account is created. The Council’s total rent that is due to be collected
for 2024/25 was £49.813m and 99.58% was collected in that year.
4.2      The Council has to consider writing-off arrears of rent which it has not
been possible to collect or which it considers will not be recoverable.  It
should be noted that, although these cases are written-off, a record of the
arrears is maintained and there is nothing to prevent later pursuit of the
debt if new information becomes available in the future, with the exception
of prescribed debts.
4.3      The accounts submitted for write off are for former tenants and fall into
the unreasonable to pursue, due to being unable to trace or deceased
categories.
ITEM 13
Page 145

Page 146

4.4 Former tenant arrears where our diligence action has been exhausted are
requested to be written off.  Examples of the actions that have been taken
include –
 telephone calls
 text messages
 letters
 house visits
4.5 For former tenants that have moved out-with our area, attempts will be
made to locate them by Corporate Debt and our debt partners by using
various systems which include the local authority collection and tracing
application (LoCTA).  LoCTA provides the Council with access to other
local authorities data alongside other national datasets, which include –
 Council Tax records
 Benefit records
 Business Rates
 Voters Roll
 Equifax Credit Rating
 TransUnion Credit Rating
 Companies House
4.6 Various attempts to recovery the debt are made, which include increased
trace attempts for former tenants that have moved out-with our area,
engagement attempts and consideration to further avenues for recovery
which included discussions with our debt partners which can result in
cases being reviewed for longer.  These cases have exhausted all
recovery attempts.
4.7 Unfortunately, former tenants with arrears over £5,000 tend to lead
chaotic lifestyles which can include addition issues, health and various
other issues.  The cases for write off have had periods of non-
engagement followed by periods of rent being paid by tenant and/or
Housing Benefit or Universal Credit.  Due to the level of income received
by tenants, they can be paying their on-going rent charge with only small
amount available to be paid to arrears.  This arrangement can be
sustained for months without issue and suddenly this ceases with officers
having no immediate success in contacting tenants with arrears building. 
When the tenant does engage, a new arrangement is made however
arrears have increased and this circle can unfortunately continue.
4.8 As full records are maintained for all cases written off if in future
circumstances change this debt may be reinstated.  This also includes
cases that our managed debt partners have fully exhausted recovery
attempts. The total proposed write-off is 18 cases totaling £135,418.22.
4.9 The officers during engagement and the recovery process ensure tenants
know we can provide support, either financial or through W4U and that
they should engage if they are struggling rather than ignoring the issue,
hoping it will resolved itself and avoiding officers for weeks/months.  The
engagement process is often successful but unfortunately not in all cases
with some tenants that fail to engage until court action.  Once court action
has been started, tenants will engage with officers and this will continue
Page 146

Page 147

for a period and then suddenly it ceases, until we are back to court action
stage and this cycle can continue.
5.        People Implications
5.1      There are no people implications.
6.        Financial & Procurement Implications
6.1      Sufficient provision exists for this write off.  There are no
procurement implications.
7.        Risk Analysis
7.1      If write offs are not approved, this will affect the monitoring of performance
against targets for performance indicators and budget monitoring within the
Housing Revenue Account (HRA).
8.        Equalities Impact Assessment (EIA)
8.1      No significant issues were identified in a screening for potential equality
impact of this report.
9.        Strategic Environmental Assessment (SEA)
9.1      There is no requirement to carry out a SEA
10.      Consultation
10.1    Consultation has taken place with Housing and Legal Services.
11.      Strategic Assessment
11.1    Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the 5
strategic priorities of the Council’s Strategic Plan. This report forms part
of the financial governance of the Council’.
Peter Barry
Chief Officer – Housing and Employability
Date:   26/10/2025
________________________________________________________________________________________
Person to contact:            Ryan Chalmers, Section Head (Revenues &
Benefits) Council Offices, Church St, Dumbarton
Telephone (01389) 737557
Email: ryan.chalmers@west–dunbarton.gov.uk
Appendix:                            None
Background Papers:        Detailed list of proposed write offs
Wards affected:                 All Council wards
Page 147

Page 148

Page 148

Page 149

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief officer Housing 
Housing and Communities Committee: 20th August 2025
______________________________________________________________ 
Subject:       Building Services Procurement Provision update 
(Approval required to Award) 
1. Purpose 
1.1 The purpose of this report is to advise Committee of completed tender
processes for Building Services. 
1.2 To seek Committee approval to allow award of contract by the Chief
officer of Housing & Employability to the below named successful
bidders. 
2. Recommendations 
2.1 It is recommended that Members: 
i. note the contents of this report. 
ii. approve the contract award to the contractors listed within the
table in section 4.2 of this report; and 
3. Background
3.1  Good progress has been made in letting necessary contracts to ensure
full compliance with Council Standing Orders, Council Financial
Regulations and all Procurement Regulation. 
3.2 Committee Members are requested to refer to these reports which
included information on the services Building Services provides on
behalf of the Council, the need to progress tenders that support the
section’s deliver of a high quality repairs and maintenance service for
the Council’s housing and non-housing properties.        
4. Main Issues
4.1 A detailed tender process has been undertaken and multiple bids
received on the contracts listed. 
4.2 These following contracts will be required to deliver a comprehensive
repairs and maintenance service for a period of up to five years from
the date of let. They will be of sufficient size, scope and duration to
cover the estimated volume of work for the period in question and will
be awarded to suitably qualified and competent suppliers and
contractors.
ITEM 14
Page 149

Page 150

Requirement:
Joint provision of void
property cleaning services
for housing/homeless
Total
Estimated
Annual
Value
Number
of bids
received 
Preferred bidder  
Lot 1 
(Homeless Properties)
£170,155 7 New Two Ltd.
Lot 2 
(Void Properties)
£127,900 9 Campbell
cleaning service
Ltd. 
4.3 All procurement activity carried out by the Council in excess of £50,000 
is subject to a contract strategy. The procurement route followed for
each of these contracts has been as per the strategy previously noted
to the committee. 
4.4 This procurement exercise has be conducted in accordance with the
Corporate Procurement Unit in close consultation with Building
Services officers and the provisions of Contract Standing Orders, the
Financial Regulations and relevant Public Procurement Regulations. 
5. People Implications 
5.1 Procurement processes are complete, further officer time obligations
are primarily in relation to operating the contract.   
6. Financial Implications
6.1   Costs of the support contracts will be funded by both Capital and
Revenue budgets through the Housing Revenue Account, Central 
Repairs Account and Housing Maintenance Trading Account. 
6.2 Costs of contracts listed under 4.2 are included within existing budgets.     
7. Risk Analysis
7.1 On-going investment, in-line with business plans, will allow the Council
to meet its landlord, health and safety and quality standards obligations
whilst providing appropriate asset management. 
8. Equalities Impact Assessment (EIA) 
8.1 An Equalities Impact Assessment or screening as appropriate has
been carried out. The report does not propose altering any existing
policy or pattern of service delivery.   
9. Strategic Assessment 
9.1 This report contributes to the Council’s Strategic Priorities and in
particular towards: 
i. improving economic growth and employability. 
Page 150

Page 151

ii. improving local housing and environmentally sustainable
infrastructure; and 
iii. improving the wellbeing of communities. 
10. Consultation 
10.1 Finance and Legal have been consulted regarding the set up of the
contracts referred to in this report.     
10.2 The Corporate Procurement team have been consulted in the
development of this report.  They have provided assistance and
professional guidance with the administration of the tender exercises.       
Peter Barry
Chief Officer Housing
Date: 15 October 2025 
______________________________________________________________ 
Persons to Contact: Alistair Norris  
Contracts Manager,  
Building services; 
Cochno Street, Clydebank, 
Telephone: 01389 738200, 
e-mail: alistair.norris@west-dunbarton.gov.uk 
Appendices: Nil 
Background Papers: Nil 
Wards Affected: All 
Page 151

Page 152

Page 152

Page 153

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief officer Housing and Employability 
Housing and Communities Committee: 19 November 2025
______________________________________________________________ 
Subject:       Building Services Procurement Provision update  
(Approval required to Tender) 
1. Purpose 
1.1 The purpose of this report is to advise Committee of updated tender
requirements information for Building Services. 
1.2 To seek Committee approval to continue with necessary procurement
and tender processes. 
1.3 To seek Committee approval to allow subsequent award of contract by
the Chief officer of Housing. 
2. Recommendations 
2.1 It is recommended that Members: 
i. Note the contents of this report. 
ii. Approve the procurement processes to tender the requirements
listed within the table in section 4.4 of this report; and 
iii.  Delegate approval to award contracts to successful bidders to the
Chief officer of Housing & Employability. 
3. Background
3.1  Building Services and Corporate Procurement Unit have been making
good progress in letting necessary contracts to ensure full compliance
with Council Standing Orders, Council Financial Regulations and all
Procurement Regulation.  
3.2 Building Services provides, on behalf of the Council, a high quality
repairs and maintenance service for the Council’s housing and non-
housing properties. These tenders are needed to support the delivery
of these services.  
4. Main Issues
4.1 A review of the historic spend on the previous versions of these
contracts and estimated volumes of known and expected works has
taken place, costs identified are expected to have increased over the
intervening period and projected costs are as detail in the table below.
ITEM 15
Page 153

Page 154

4.2 The Council will develop bespoke Framework Agreements for
Subcontractors and Specialist Contractors for Building Services which
will ensure an open and transparent method of identifying suitably
competent and qualified contractors by means of a legally compliant
procurement route ensuring value for money with a mechanism for
controlling rates within the contracts.  As part of the Procurement
exercise the project team will pro-actively target local SMEs using trade
directories, local knowledge and by using social media channels to
encourage bids.  There will also be engagement with Business Support
and the Chamber of Commerce.  A Meet the Buyer event and Supplier
Development Day will take place ahead of the tender going live with
training and support offered to potential bidders.   
4.3 The Council will also call off from collaborative framework agreements
through Scotland Excel and Scottish Procurement Alliance. The
Contract Strategy determined that the best procurement route was a
blended approach with a mixture of collaborative Framework
Agreements being utilised where available and setting up a Council
Framework Agreement for the rest of the requirements.  When a
Framework Agreement is identified as the best procurement route, a
mini competition is one of the procedures for awarding contracts.  A
further competition based on refined requirements is conducted with all
suitable contractors to determine which contractor is the most
economically advantageous contractor 
4.4 The following contracts will be required to deliver a comprehensive
repairs and maintenance service for a period of up to four years from
the date of let. They will be of sufficient size, scope and duration to
cover the estimated volume of work for the period in question and will
be awarded to suitably qualified and competent suppliers and
contractors. 
Requirement: Subcontractors
and Specialist Contractors for
Building Services Framework
Agreement Open Tender
Total
Estimated four
year Value
Funded By
HRA Revenue
/ Capital and
CRA 
Priority 
Lot 1: Landscaping  £1,260,000 Capital &
Revenue
High
Lot 2: Asbestos Removal £1,092,000 Capital &
Revenue
High
Lot 3: Flooring £1,040,000 Capital &
Revenue
High
Lot 4: Metal Fabrications £1,572,000 Capital &
Revenue
High
Lot 5: Scaffolding £1,280,000 Capital &
Revenue
High
Lot 6: Electrical Specialist
including Entry Systems
£4,020,000 Capital &
Revenue
High
Lot 7: Laundry Equipment  £192,000 Capital &
Revenue
High
Page 154

Page 155

Lot 8: UPVC Windows & Doors £11,400,000 Capital &
Revenue
High
Lot 9: Small Job £2,600,000 Capital &
Revenue
High
Lot 10: Void Property and
refurbishment
£4,800,000 Capital &
Revenue
High 
Requirement: Calling off from
Collaborative Framework
Agreements
Total
Estimated four
year Value
Funded By
HRA Revenue
/ Capital and
CRA 
Priority 
Lift Equipment – Calling off from
Scottish Procurement Alliance 
£1,100,000 Capital &
Revenue
High
Asbestos Survey – Calling off
from Scotland Excel Framework 
£290,000 Capital &
Revenue
High
Modern Facilities Installations
and Improvement - Calling off
from Scottish Procurement
Alliance
£14,000,000 Capital &
Revenue
High 
4.5 All procurement activity carried out by the Council in excess of £50,000 
is subject to a contract strategy. The strategy for the contracts as 
listed in the table at 4.4 will include but may not be limited to; contract 
scope, service forward plan, the market, procurement model and
routes – including existing delivery vehicles, roles and responsibilities,
risks,  issues and opportunities and on-going contract management.     
4.6 This procurement exercise will be conducted in accordance with the
Corporate Procurement Unit in close consultation with Building
Services officers and the provisions of Contract Standing Orders, the
Financial Regulations and relevant Public Procurement Regulations. A
Contract Strategy document was also approved on 15 October 2025 
5. People Implications 
5.1 Progressing these procurement processes will require significant
Officer time resource from Building Services, Consultancy Services,
Housing Operations and Corporate Procurement teams.     
6. Financial Implications
6.1   Costs of the support contracts will be funded by both Capital and
Revenue budgets through the Housing Revenue Account, Central 
Repairs Account and Housing Maintenance Trading Account. 
6.2 Costs of contracts listed under 4.4 are included within existing budgets.     
Page 155

Page 156

7. Risk Analysis
7.1 On-going investment, in-line with business plans, will allow the Council
to meet its landlord, health and safety and quality standards obligations
whilst providing appropriate asset management. 
7.2 Procurement related risks and mitigation/management measures will 
be identified as part of the development of tendering strategies for the 
individual requirements.     
8. Equalities Impact Assessment (EIA) 
8.1 An Equalities Impact Assessment or screening as appropriate will have
been carried out. The report does not propose altering any existing
policy or pattern of service delivery.   
9. Strategic Assessment 
9.1 This report contributes to the Council’s Strategic Priorities and in
particular towards: 
i. Improving economic growth and employability. 
ii. Improving local housing and environmentally sustainable
infrastructure; and 
iii. Improving the wellbeing of communities. 
10. Consultation 
10.1 Finance and Legal have been consulted regarding the set up of the
contracts referred to in this report.     
10.2 The Corporate Procurement team have been consulted in the
development of this report.  They will provide assistance and
professional guidance with the administration of the tender exercises.       
Peter Barry
Chief Officer Housing & Employability
Date: 15 October 2025 
______________________________________________________________ 
Persons to Contact: Alistair Norris  
Contracts Manager  
Cochno Street, Clydebank,  
Telephone: 01389 738200,  
e-mail: alistair.norris@westdunbarton.gov.uk
Page 156

Page 157

Appendices: Nil 
Background Papers: Contract Strategy 
Wards Affected: All 
Page 157

Page 158

Page 158

Page 159

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources 
Housing and Communities Committee: 19 November 2025
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 31 August 25 (Period 05)
1. Purpose
1.1 The purpose of this report is to advise committee of the 2025/26 HRA revenue
budget position at 31 August 2025 and the forecast position for HRA reserves
on 31 March 2026.
2. Recommendations
2.1 Members are asked to:
i. note a projected favourable variance (underspend) on the HRA Revenue
Account of £1.150m, a significant improvement on the period 3 forecast.
ii. note the forecast 31 March 2026 HRA reserve position of £1.761m which is
£0.601m above the HRA prudential target of £1.160m.
iii. note further opportunities to deliver an increased HRA surplus, including the
targeting of efficiencies across all areas of the HRA revenue account budget,
will be explored.
3. Background
3.1 The Council approved the 2025/26 Housing Revenue Account (HRA) revenue
budget on the 5 March 2025 with a prudential reserve target of £1.160m. HRA
prudential reserves were £0.611m on 31 March 2025.
4. Main Issues
4.1 This report advises committee of the key issues contributing to the HRA
forecasting a 2025/26 surplus of £1.150m, an improvement of £1.431m on the
period 3 forecast of a £0.281m deficit. The movement between the period 3
forecast and the current forecast is summarised in Exhibit 1 and the variance
between the period 5 forecast and the 2025/26 budget is summarised in
Exhibit 2. The improved financial position is primarily due to a reduced loan
charge forecast. There are two key drivers for lower debt servicing costs:
 a forecast reduction in 2025/26 HRA borrowing resulting in lower
interest payments
 a one off HRA credit following early repayment of four long term loans.
ITEM 16
Page 159

Page 160

Exhibit 1 – Movement between Forecast at BCR03 and BCR05
Budget Heading
Forecast
BCR03
£m
Forecast
BCR05
£m
Change
£m
Key Driver
Employee Costs 8.111 8.102 -0.009
Property Costs 1.381 1.386 0.005
Transport Costs 0.177 0.177 -
Supplies, Services
and Admin 0.409 0.409 -
Support Services 2.584 2.586 0.002
Other Expenditure 0.437 0.397 -0.040 Reduced abatement spend
Repairs &
Maintenance 12.353 12.469 0.116 Increased repair demand
Open Space
Maintenance 0.772 0.772 -
Bad Debt Provision 1.269 1.269 -
Void Loss / Council
Tax 1.100 1.120 0.020 Slightly higher void loss
forecast
Loan Charges 28.571 27.332 -1.239
Reduced 2025/26 HRA
capital borrowing
One off credit from loan
repayment
HRA Expenditure 57.164 56.001 -1.063
HRA Income -56.883 -57.151 -0.268 Additional house rent
income
HRA Surplus 0.281 -1.150 -1.431
Exhibit 2 - Forecast BCR05 compared to Budget 25/26
Budget Heading
Forecast
BCR05
£m
Budget
2025/26
£m
Variance
£m
Employee Costs 8.102 7.855 0.347
Property Costs 1.386 1.349 0.037
Transport Costs 0.177 0.154 0.023
Supplies, Services and Admin 0.409 0.418 -0.009
Support Services 2.586 2.584 0.002
Other Expenditure 0.397 0.420 -0.023
Repairs & Maintenance 12.469 12.173 0.296
Open Space Maintenance 0.772 0.908 -0.136
Bad Debt Provision 1.269 1.119 0.150
Void Loss / Council Tax 1.120 0.831 0.289
Loan Charges 27.332 29.055 -1.723
HRA Expenditure 56.101 56.866 -0.765
HRA Income -57.151 -56.901 -0.250
HRA Surplus -1.150 -0.035 -1.115
Page 160

Page 161

4.2 The variances between forecast and budget are detailed below.
Employee Costs - £0.347m Adverse.
4.3 The main employee cost pressures relate to employers’ national insurance
contribution costs and a higher than budgeted 2025/26 pay settlement.
4.4 The HRA did not budget for the increase in employers’ national insurance
costs in 2025/26. When the decision was made not to provide for additional
national insurance costs in the HRA estimates, it assumed the Scottish
Government would provide sufficient additional funding to enable the Council
to compensate the HRA for this cost pressure. However, the increase was not
fully funded and therefore national insurance costs are forecast to be
£170,000 more than estimate.
4.5 The HRA estimates allowed for a 3% pay award for 2025/26. On the 13 June
2025, COSLA wrote to trade unions with a two-year pay offer, a 4% increase
in 2025/25 and a 3.5% increase in 2026/27. The forecast is based on the 4%
pay award with the higher award creating an £80,000 HRA cost pressure.
Repair and Maintenance - £0.296m Adverse.
4.6 The £12.173m HRA repair and maintenance budget is forecasting a slight
overspend against budget. There continues to a high responsive repair
demand with delivery costs forecast to be £990,000 over budget. A range of
mitigations are in place to address the cost pressure, including tighter controls
on contractor use and the capitalisation of Electrical Installation Condition
Report (EICR) spend that complements the environmental sensor programme.
Open Space Maintenance - £0.136m Favourable.
4.7 The favourable variance against the open space maintenance budget reflects
the close working with between housing and greenspace staff to deliver a
saving against environmental budgets relating to revised work specifications
and streamlined processes in relation to void and temporary accommodation
properties.  There is also joint work progressing between Housing and
Greenspace to undertake a review of HRA areas maintained across the
general open space maintenance programme with the findings due to be
reported to March Council.
Bad Debt Provision - £0.150m Adverse.
4.8 The HRA needs to make prudent financial provision for uncollected income
across a range of HRA debts, including rent arrears, rechargeable repairs,
factoring services and capital works.
4.9 HRA income levels have increased over the past few years because of council
house rent increases, a more stringent application of the rechargeable repairs
policy for repairs caused by tenant neglect / abuse, and the increased
amounts invoiced to owners residing within former HRA properties (factoring /
common repairs / capital works).
Page 161

Page 162

4.10 Performance recovering this debt and outstanding debt levels is kept under
constant review. Debt levels have increased alongside the increase in the
amount billed to tenants / owners. The forecast adverse variance assumes an
increase in the bad debt provision to take account of the increased debt.
Void Loss / Council Tax - £0.289m Adverse.
4.11 Council tax payments for longer term void houses are forecast to reduce by
£60,000 in 2025/26 compared to 2024/25 as more longer-term voids are let.
However forecast council tax payments for 2025/26 are £150,000 compared to
a target of £50,000. Although there has been an overall reduction in voids
being delayed due to meter issues, there still remains a smaller number of
longer-term properties with complex meter issues that are causing delays with
the utility companies.  Officers will continue to work with utility companies, to
find solutions for these complex meter issues.
4.12 There has been considerable progress in reducing void numbers and void rent
loss. The void rent loss is forecast to reduce by £125,000 in 2025/26
compared to 2024/25 as void numbers reduce, however forecast void loss for
2025/26 is £876,000 compared to a target of £700,000. Reducing void loss is
an operational priority and the Council’s Void Working Group and Building
Services Improvement Plan will support further improvement in this key area.
Loan Charges - £1.723m Favourable.
4.13 The 2025/26 HRA loan charge estimates were based on anticipated HRA
capital debt of £356m on 31 March 2025. However, lower HRA capital
borrowing in 2024/25 across the More Home (new build) capital programme
led to HRA debt being £348m on 31 March 2025, £8m less than anticipated.
The lower opening debt level will attract lower debt servicing costs.
4.14 HRA capital borrowing in 2025/26 is forecast to be £15m less than planned.
Approximately £6m of the reduced borrowing was advised to Council at
BCR03 and primarily related to revised cashflows across the More Homes
programme. Given the significant financial pressures on the HRA and the
impact of elevated borrowing costs on HRA revenue budgets, and
consequently rent, officers have reviewed the 2025/26 HRA capital
programme to identify opportunities to reduce 2025/26 borrowing through
more efficient commissioning of capital works and through some reprofiling of
programmed spend into future years. The HRA capital BCR report to this
same Council meeting provides a full explanation of the planned borrowing
reductions.
4.15 There is a further favourable variance because the Council’s Finance Team, in
conjunction with our Treasury Advisers (MUFG), identified an opportunity to
terminate £33.1m of long-term fixed rate loans in return for a discounted
repayment amount.  The four loans were due to mature between 2064 and
2078. More information on the one-off financial benefit this has delivered is
detailed in the Finance Update presented to this same Council meeting. The
benefit to the HRA in 2025/26 is £818,000.
Page 162

Page 163

4.16 Members will be aware of the significant risk and uncertainty around
forecasting local authority borrowing costs. The HRA has paid a much higher
interest rate on its outstanding capital debt over the last two years because of
the sharp increase in the interest rates payable on new temporary and new
Public Work Loans Board (PWLB) borrowing. There is a risk that HRA debt
interest payments are more than forecast.
Income - £0.250m Favourable.
4.17 The favourable variance against the HRA income budget relates to house
rental income exceeding budget. A prudent approach was taken when setting
the rental income budget from 2025/26 given the uncertainty over the timing of
new build and buy back properties being available for rent. A mid-year review
has forecast rental income to exceed budget.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year. This can
affect all service areas.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 All services involved in delivering the HRA revenue budget have been
consulted during the compilation of this report.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Page 163

Page 164

Laurence Slavin
Chief Officer – Resources
Date: 19 November 2025
___________________________________________________________________
Person to Contact: Jim McCarron - Business Unit Finance Partner    
Telephone: 07772 322055
e-mail james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue)
Background Papers: None
Wards Affected: All
Page 164

Page 165

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2025/26
PERIOD END DATE
Budget
2025/26
Spend to Date
2025/26
Forecast Spend
2025/26 Annual RAG Status
£000 £000 £000 £000 %
Employee Costs 7,855 3,376 8,102 247 3% 
Property Costs 1,349 577 1,386 37 3% 
Transport Costs 154 74 177 23 0% 
Supplies, Services And Admin 418 170 409 (9) -2% 
Support Services 2,584 1,077 2,586 2 0% 
Other Expenditure 420 165 397 (23) -5% 
Repairs & Maintenance 12,173 5,147 12,469 296 2% 
Open Space Maintenance 908 322 772 (136) -15% 
Bad Debt Provision 1,119 529 1,269 150 13% 
Void Loss (Council Tax / Lost Rents) 831 467 1,120 289 35% 
Loan Charges 29,055 11,381 27,314 (1,741) -6% 
Total Expenditure 56,866 23,285 56,001 (865) -2% 
House Rental Income (55,961) (23,446) (56,270) (309) 1% 
Lockup Rental Income (232) (97) (233) (1) 0% 
Other Rental income (137) (56) (134) 3 -2% 
Factoring Income (448) (179) (430) 18 -4% 
Miscellaneous Income (123) (35) (84) 39 -32% 
Total Income (56,901) (23,813) (57,151) (250) 0% 
Net Expenditure (35) (528) (1,150) (1,115) 
31 August 2025
Subjective Summary Forecast Variance
2025/26
ITEM 16 - APPENDIX 1
Page 165

Page 166

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2025/2026
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 August 2025
PERIOD 5
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Employee Costs 7,855 8,102 247 3% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Repairs & Maintenance 12,173 12,469 296 2% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Open Space Maintenance 908 772 (136) -15%
Main Issues
Mitigating Action
Anticipated Outcome A year end underspend
Subjective Description
Open space maintenance on HRA land and ad-hoc works on void and homeless properties instructed by housing staff
Variance Narrative
Reduce work specifcation agreed with Greenspace to delvier an in-year saving. This saving is
currently under review.
None
Variance Analysis
Subjective Analysis
Forecast Variance
2025/26 RAG
Status 
Variance Analysis
Forecast Variance
2025/26
Subjective Description
Subjective Analysis RAG
Status
Employees charged directly to the HRA.
Variance Narrative
Recruitment of critical posts and higher employer national insurance costs are creating a cost
pressure. The forecast also incudes a cost pressure for a higher than estimated pay
settlement. COSLA have offered employees a 4% pay award for 2025/26, the estimates
included a 3% provision.
Management will target staffing efficiencies, including tighter controls on staff recruitment and
overtime.
A year end overspend.
Officers have reviewed the repairs spend and identified a potential saving against the
2025/2026 repair and maintenance budget by transferring qualifying repair spend to the HRA
capital programme, primarily revenue funded works that extend the lifespan of the assets.
Furthermore, Electrical Installation Condition Report (EICR) spend that is complementary to the
environmental sensor installation programme has also been funded from the HRA capital
programme.
A year end overspend.
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Description
Responsive and planned repair and maintenance services to houses and lockups and income recovered from tenant rechargeable and
owner occupier repairs.
Variance Narrative
A high  volume of repair orders and ongoing inflationary pressures are driving up costs, with the
most significant pressure across responsive repair budgets
ITEM 16 - APPENDIX 2
Page 166

Page 167

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/2026
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 August 2025
PERIOD 5
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Bad Debt Provision 1,119 1,269 150 13% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Void Loss (Council Tax / Lost Rents) 831 1,120 289 35% 
Main Issues
Mitigating Action
Anticipated Outcome
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
A year end overspend.
Variance Analysis
Forecast Variance
2025/26
Variance Narrative
Subjective Analysis RAG
Status
RAG
Status
Housing staff will continue to engage with utility companies to highlight meter issues that are
preventing properties being available for let. Housing and Building Services staff will continue to
prioritise the repair and subsequent allocation of longer term void properties. Housing staff will
continue to develop and argue the case for additional council tax relief.
Subjective Description
Lost rental income for void houses and lockups and the cost of council tax on long term void properties.
Subjective Description
Provision for uncollected rent across range of HRA debts, including rent arrears, rechargeable repairs and factoring services.
Void numbers and council tax payments for longer term void houses are forecast to exceed
budget. There are ongoing challenges with utility companies as council staff try and resolve
debt on meters and meter reconnections. The poor performance of the utility companies
adversely impacts on the length of time properties are void and leads to more empty properties
incurring a council tax liability. The service is also working with the council tax team / the
assessor service to secure maximum relief for several of our longer-term void properties.
Variance Narrative
The Council needs to make prudent provision for the non collection of HRA debt. HRA debt
has been increasing as officers more stringently apply the rechargeable repairs policy for
repairs caused by tenant neglect / abuse. These debts are difficult to collect because tenants
often have multiple other debts with the Council and others.
A review of the bad debt provision has identified a need to further increase the amount set
aside for irrecoverable debt.
Housing and Corporate Debt staff continue to work closely to maximise contact with customers
with debt and to put in place reasonable affordable repayment plans that take account of
customers personal circumstances.
A year end overspend.
Page 167

Page 168

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/2026
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 August 2025
PERIOD 5
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Loan Charges 29,055 27,314 (1,741) -6% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
House Rental Income (55,961) (56,270) (309) 1% 
Main Issues
Mitigating Action
Anticipated Outcome
Subjective Analysis Forecast Variance
2025/26
RAG
Status
A year end underspend.
Subjective Description
Loans Fund repayments and the payment of interest and expenses on outstanding HRA debt.
Variance Narrative
HRA capital  debt at 31 March 2025 was lower than forecast and this led to lower debt
servicing costs across both debt repayment and debt interest.
Furthermore, the forecast at BCR05 is for the HRA capital spend 25/26 to be less than budget,
lowering the HRA borrowing requirement 25/26 and, consequently, lower then budgeted
interest charges this year.
Finally, there is a one off treasury management credit of £818,000 available for the HRA
following a restructure of a number of council loans.
None.
Variance Analysis
A year end over-recovery
Subjective Description
Income from the  letting of housing stock to tenant and to the homeless service.
Variance Narrative
A prudent approach was taken when setting the income budget from 2025/26 given the
uncertainty over the  timing of new build and buy back properties being available for rent. A mid-
year review has forecast  rental  income to be £309,000 (0.5%) more than budget.
None.
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Page 168

Page 169

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources 
Housing and Communities Committee: 19 November 2025
___________________________________________________________________
Subject: Housing Revenue Account (HRA) Capital 
Budgetary Control Report to 31 August 2025 (Period 5)
1. Purpose
1.1 This report provides an update on the HRA capital programme to 31 August
2025.
2. Recommendations
2.1 Committee is asked to:
i) Note the position of the 2025/26 HRA capital budget and the HRA capital plan
as 31 August 2025.
ii) Note project life performance is monitored against a £345.311m project life
expenditure estimate, a £80.379m project life income estimate and a
£264.932m five-year borrowing requirement.
iii) Note all projects are currently on track to achieve their planned completion
dates and that eleven projects are forecast to deliver a total underspend of
£6.481m against their five-year project life budgets.
iv) Note in year financial performance is monitored against a 2025/26 capital
expenditure budget of £55.547m, 2025/26 capital income budget of £6.290m
and a one-year borrowing requirement of £49.257m.
v) Note thirty-two projects are reporting as off track in 2025/26 with an
anticipated under spend of £9.812m against their 2025/26 budgets reducing
the forecast one-year borrowing requirement to £39.445m.
3. Background
3.1 The Council approved the HRA Capital Plan for 2025/26 to 2029/30 on 5
March 2025. The HRA capital plan approved £70.590m of capital expenditure
and £15.324m of capital income in 2025/26, creating a borrowing requirement
of £55.266m.
3.2 At the previous meeting on the 27 August 2025, the committee agreed budget
adjustments that revised the 2025/26 capital expenditure budget to £55.547m
and the capital income budget to £6.290m, an updated one-year borrowing
requirement of £49.257m. Committee also approved a revised project life
budget of £264.932m. A summary of the revised capital budgets is set out in
Exhibit 1.
ITEM 17
Page 169

Page 170

Exhibit 1: HRA Capital Estimates 2025/26 – 2029/30
Project Life
Budget
(£m)
2025/26
Budget
(£m)
Project Life
Forecast
BCR05
(£m)
2025/26
Forecast
BCR05
(£m)
Other Capital Expenditure 26.267 7.433 26.052 6.738
Component Replacement 93.567 20.881 89.226 14.468
Void Capital 19.873 5.258 19.873 5.700
Structural & Environmental 17.320 3.762 16.653 1.875
Support Costs 17.155 3.100 17.155 3.100
More Homes Programme  171.129 15.113 171.129 17.962
Total Expenditure 345.311 55.547 340.088 49.843
Total Income -80.379 -6.290 -81.636 -10.398
Prudential Borrowing 264.932 49.257 258.452 39.445
4. Main Issues
4.1 Progress against the 2025/26 capital plan is detailed in:
Appendix 1 – HRA Capital Summary BCR05
Appendix 2 – HRA Capital Detail BCR05
4.2 The HRA capital summary report at Appendix 1 reports that:
 project life expenditure is forecast to be less than budget by £5.223m over
the 5-year period of the capital plan.
 one project has forecast project life income of £1.258m more than the
project budget
 consequently, prudential borrowing will be £6.481m less than the approved
project life budget over the 5-year period of the capital plan.
4.3 Appendix 2 reports all projects with their approved in year and project life
estimates as well as their 2025/2026 expenditure and income forecasts. The
appendix reports:
 2025/2026 forecast spend of £49.843m, a £5.704m underspend against
the 2025/2026 budget.
 2025/2026 forecast income of £10.398m, a £4.108m over-recovery against
the 2025/2026 budget
 2025/2026 prudential borrowing will be £39.445m, £9.812m less than the
approved plan for 2025/2026.
4.4 Commentary on the 2025/2026 variances are set out in Exhibit 2 below.
Exhibit 2: Project Over / Underspends 2025/2026 as at BCR05
Project 25/26
Forecast
(£m)
25/26
Budget
(£m)
25/26
Variance
(£m) Commentary
1 Special Need
Adaptations
0.668 0.688 0.020 Small overspend to be re-
profiled across future years.
Page 170

Page 171

Project 25/26
Forecast
(£m)
25/26
Budget
(£m)
25/26
Variance
(£m) Commentary
2 Capitalised
Minor Works
3.500 3.715 -0.215 Reduced contractors spend.
Underspend will reduce
borrowing requirement
3 Environmental
Sensors
1.500 2.000 -0.500 Underspend due to
challenges getting access to
properties.
Underspend will be re-
profiled across future years.
4 Targeted
SHQS /EESSH
compliance
works
5.000 6.628 -1.628 Underspend reflects the
changing mix of the capital
programme with an
increased number of mixed
tenure blocks that require
owner consent before work
can start. This necessary
process delays project start.
Underspend to be re-profiled
across future years.
5 External
Component
Renewal -
Roofs
1.250 2.500 -1.250 Underspend reflects the
changing mix of the capital
programme with an
increased number of mixed
tenure blocks that require
owner consent before work
can start. This necessary
process delays project start.
Underspend will reduce
borrowing requirement.
6 Doors/Windows
Component
Renewals
3.600 4.985 -1.385 Underspend due to
challenges getting access to
properties. Install team to
continue programmed
addresses and revisit no
accesses to use materials
already supplied.
Underspend will reduce
borrowing requirement.
7 External Stores
/ Garages / Bin
Stores
0.000 0.048 -0.048 Works are being funded from
the capitalised minor works
budget.
Underspend will reduce
borrowing requirement
Page 171

Page 172

Project 25/26
Forecast
(£m)
25/26
Budget
(£m)
25/26
Variance
(£m) Commentary
8 Secure entry
component
renewals
0.000 0.100 -0.100 Works are being funded from
the capitalised minor works
budget.
Underspend will reduce
borrowing requirement.
9 Statutory /
Regulatory
Compliance
Works
0.150 0.594 -0.444 Health and safety works are
now being delivered across
two years.
Underspend will be re-
profiled across future years.
10 Energy
Improvements /
Energy
Efficiency
Works
0.000 0.058 -0.058 Works are being funded from
the capitalised minor works
budget.
Underspend will reduce
borrowing requirement.
11 Kitchen
Upgrade
1.600 2.850 -1.250 Underspend projected as
team re-assess and pre-
inspect to ensure a focus on
necessary renewals led by
condition.
Underspend will reduce
borrowing requirement.
12 Bathroom &
Shower
Replacement
0.600 0.800 -0.200 Underspend projected as
team re-assess and pre-
inspect to ensure a focus on
necessary renewals led by
condition.
Underspend will reduce
borrowing requirement.
13 Void House
Strategy
Programme
5.700 5.258 0.442 Contractor voids spend
greater than budgeted.
Overspend will be re-profiled
across future years.
14 Defective
structures
/component
renewals
0.175 0.800 -0.625 Underspend projected as
future blocks are pre-
inspected for condition and
re-prioritisation for
completion if necessary.
Building Services resources
are assisting in the void
house programme of work.
Underspend will reduce
borrowing requirement.
Page 172

Page 173

Project 25/26
Forecast
(£m)
25/26
Budget
(£m)
25/26
Variance
(£m) Commentary
15 Environmental
Renewal -
Paths &
Environment
1.100 1.000 0.100 Overspend due to mix of
work requiring contactors in
addition to in-house team.
Overspend will be re-profiled
across future years.
16 Asbestos
Management
Works
0.200 0.242 -0.042 Demand lower than
anticipated.
Underspend will reduce
borrowing requirement
17 Multi Storey
Flat Strategy
0.400 1.720 -1.320 Revised projection based on
timing of programme.
Underspend will be re-
profiled across future years.
18 Buy Backs 4.000 4.380 -0.380 Revised projection based on
the anticipated programme of
thirty-five acquisitions to be
completed in 25/26.
Underspend will be re-
profiled across future years.
19 Demolition
Programme
0.206 0.140 0.066 Revised projection based on
timing of programme.
In year overspend will be re-
profiled across future years
20 Clydebank East 0.365 0.250 0.115 Revised projection based on
development project plan.
In year overspend will be re-
profiled across future years.
21 Pappert 0.872 0.730 0.142 Revised projection based on
development project plan.
In year overspend will be re-
profiled across future years.
22 Willox Park
Phase1
3.398 2.980 0.418 Revised projection based on
development project plan.
In year overspend will be re-
profiled across future years.
23 Bank Street 0.839 1.500 -0.661 Revised projection based on
development project plan.
In year underspend will be
re-profiled across future
years.
Page 173

Page 174

Project 25/26
Forecast
(£m)
25/26
Budget
(£m)
25/26
Variance
(£m) Commentary
24 Bonhill Gap
Sites
5.145 1.600 3.545 Revised projection based on
development project plan.
Overspend will be re-profiled
across future years.
25 Silverton 0.050 0.100 -0.050 Revised projection based on
development project plan.
In year underspend will be
re-profiled across future
years.
26 Queen Mary
Avenue
1.000 0.800 0.200 Revised projection based on
development project plan.
In year overspend will be re-
profiled across future years.
27 Future New
Build & Related
Regeneration
Projects
0.000 0.550 -0.550 Revised projection based on
development project plan.
In year underspend will be
re-profiled across future
years.
28 Scottish Govt
Buyback Grant
-2.378 -0.550 -1.828 Revised projection based on
the distribution of Scottish
Government acquisition
funding
29 Bank Street -0.839 -1.500 0.661 Revised projection based on
the application of the
Strategic Local Programme
30 Bonhill Gap
Sites
-3.360 -1.600 -1.760 Revised projection based on
the application of the
Strategic Local Programme
31 Clydebank
Health Centre
-0.350 -0.375 0.025 Revised projection based on
the application of the
Strategic Local Programme
32 Other Grant -1.612 -0.406 -1.206 Additional Scottish
Government Net Zero
Funding awarded to fabric
first energy efficiency works
4.5 Budget assumptions are required to forecast costs / income, especially where
projects span multi-year and project finances have yet to be finalised. It is
therefore likely that the projected year end position will change during the
year.
Page 174

Page 175

5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications.
7. Financial and Procurement Implications
7.1 The report notes the projected in-year financial position for capital estimates.
8. Risk Analysis
8.1 The main risks are as follows:
(a) The reported variances should be viewed in the knowledge that there are
several variable factors which could arise between now and 31 March
which could affect the year end results for capital budgets.
(b) To forecast for the full year costs budget assumptions have been
required. These assumptions continue to change regularly and therefore
it is likely the projected year end position will change from that reported.
9. Equalities Impact Assessment (EIA)
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 All services involved in delivering the capital estimates have been consulted
during the compilation of this report.
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council.
Page 175

Page 176

________________
Laurence Slavin
Chief Officer – Resources
Date: 19 November 2025
Person to Contact: Jim McCarron
Business Partner, Finance 07772 322055
E-mail: james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - HRA Capital Summary BCR05
Appendix 2- HRA Capital Details BCR05
Background Papers:
Housing Revenue Account (HRA) Capital Investment Programme, Revenue
Budget, and Rent Levels for 2025/26 - Council 5 March 2025.
Wards Affected           All Wards
Page 176

Page 177

Period 5 - 31 August 2025 Appendix 1
Summary
HRA Capital Expenditure Project Life
Budget
Project Life
Forecast Spend
Project Life
Variance
Rolling
Programmes
Projects Projects
On Track / Complete
Projects
Off Track
£000 £000 £000
Other Capital Expenditure 26,267                26,052                (215) 8                    -                -                              -                             
Major Component Replacement 93,567                89,226                (4,341) 11                  -                -                              -                             
Void Capital 19,873                19,873                0 1                    -                -                              -                             
Structural & Environmental 17,320                16,653                (667) 4                    -                -                              -                             
Support Costs 17,155                17,155                0 1                    -                -                              -                             
Affordable Housing Supply Programme 171,129              171,129              0 5                    12                  12                                -                             
Total Expenditure 345,311              340,088              (5,223) 30                  12                  12                                -                             
Total Income (80,378) (81,636) (1,258) 4                    12                  12                                -                             
Total 264,933 258,452 (6,481)
ITEM 17 - APPENDIX 1
Page 177

Page 178

All Approved HRA Capital Projects at Period 05  _  31 August 2025 Appendix 2
Project Category Planned
End Date
Revised
End Date
Project Life
Budget
Expenditure
to 31 /3/25
Expenditure
to Date
Projected
Future Spend
Project Life
Forecast Spend
Project
Variance
Approved
Budget
2025/26
Expenditure
to Date
2025/26
Projected
Spend
2025/26
In Year
Variance
2025/26
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
OCE1 Special Needs Adaptations Rolling 31/03/2026 3,661                    -                             288                       3,373                    3,661                    -                             668                       288                       688                       20                         
OCE2 Capitalised Minor Works Rolling 31/03/2026 12,623                  -                             1,106                    11,302                  12,408                  (215) 3,715                    1,106                    3,500                    (215)
OCE3 Better Homes Priority Budget Rolling 31/03/2026 1,175                    -                             6                            1,169                    1,175                    -                             275                       6                            275                       -                       
OCE4 Environmental Sensors Programme Rolling 31/03/2026 7,897                    -                             444                       7,453                    7,897                    -                             2,000                    444                       1,500                    (500)
OCE5 Housing CCTV Installation Programme Rolling 31/03/2026 750                       -                             287                       463                       750                       -                             750                       287                       750                       -                       
OCE6 QL Development Rolling 31/03/2026 50                          -                             1                            49                          50                          -                             10                          1                            10                          -                       
OCE7 Gypsy Travellers Site Rolling 31/03/2026 15                          -                             5                            10 15                          -                             15                          5                            15                          -                       
OCE8 Airport Noise Rolling 31/03/2026 96                          -                             -                             96                          96                          -                             -                             -                             -                             -                       
Other Capital Expenditure 26,267                  -                        2,137                    23,915                  26,052                  (215) 7,433                    2,137                    6,738                    (695)
MCR1 Targeted SHQS /EESSH compliance works Rolling 31/03/2026 30,163                  -                             1,437                    28,726                  30,163                  0 6,628                    1,437                    5,000                    (1,628)
MCR2 External Component Renewal - Roofs Rolling 31/03/2026 13,204                  -                             574                       11,330                  11,904                  (1,300) 2,550                    574                       1,250                    (1,300)
MCR3 Doors/Windows Component Renewals Rolling 31/03/2026 23,190                  -                             1,806                    19,999                  21,805                  (1,385) 4,985                    1,806                    3,600                    (1,385)
MCR4 External Stores / Garages / Bin Stores Rolling 31/03/2026 247                       -                             -                             199                       199                       (48) 48                          -                             -                             (48)
MCR5 Secure entry component renewals Rolling 31/03/2026 500                       -                             -                             400                       400                       (100) 100                       -                             -                             (100)
MCR6 Statutory / Regulatory Compliance Works Rolling 31/03/2026 1,106                    -                             -                             1,106                    1,106                    -                        594                       -                             150                       (444)
MCR7 Heating Improvement Works Rolling 31/03/2026 11,771                  -                             705                       11,066                  11,771                  -                        2,268                    705                       2,268                    -                       
MCR8 Energy Improvements / Energy Efficiency Works Rolling 31/03/2026 297                       -                             -                             239                       239                       (58) 58                          -                             -                             (58)
MCR9 Kitchen Upgrade Rolling 31/03/2026 10,089                  -                             552                       8,287                    8,839                    (1,250) 2,850                    552                       1,600                    (1,250)
MCR10 Bathroom & Shower Replacement Rolling 31/03/2026 3,000                    -                             247                       2,553                    2,800                    (200) 800                       247                       600                       (200)
Major Component Replacement 93,567                  -                        5,321                    83,905                  89,226                  (4,341) 20,881                  5,321                    14,468                  (6,413)
VOC1 Void House Strategy Programme Rolling 31/03/2026 19,873                  -                             2,265                    17,608                                     19,873                            -   5,258                    2,265                    5,700                    442                      
-                       
Void Capital 19,873                  -                        2,265                    17,608                  19,873                  -                        5,258                    2,265                    5,700                    442                      
STE1 Defective structures/component renewals Rolling 31/03/2026 4,389                                                 - 174                       3,590                    3,764                    (625) 800                       174                       175                       (625)
STE2 Environmental Renewal - Paths & Environment Rolling 31/03/2026 5,436                                                 - 479                       4,957                    5,436                    -                        1,000                    479                       1,100                    100                      
STE3 Asbestos Management Works Rolling 31/03/2026 1,239                                                 - 85                          1,112                    1,197                    (42) 242                       85                          200                       (42)
STE4 Multi Storey Flat Strategy Rolling 31/03/2026 6,256                    -                             44                          6,212                    6,256                                               -   1,720                    44                          400                       (1,320)
Structural & Environmental 17,320                  -                             782                       15,871                  16,653                  (667) 3,762                    782                       1,875                    (1,887)
SUP1 Salaries / Central Support / Overhead Rolling 31/03/2026 17,155                  -                             1,292                    15,863                                     17,155                            -   3,100                    1,292                    3,100                    -                       
Support Costs 17,155                  -                        1,292                    15,863                  17,155                  -                        3,100                    1,292                    3,100                    -                            
AHP1 Buy Backs Rolling 31/03/2030 21,387                  -                             1,243                    20,144                                     21,387                            -   4,380                    1,243                    4,000                    (380)
AHP2 Demolition Programme Rolling 31/03/2029 1,140                    -                             207                       933                                            1,140                            -   140                       207                       206                       66                         
AHP3 Contingency Rolling 31/03/2030 530                       -                             -                             530                                               530                            -   102                       -                             102                       -                       
AHP4 Clydebank East Project 30/04/2025 33,643                  32,953                  33,085                  558                                          33,643                            -   250                       132                       365                       115                      
AHP5 Pappert Project 30/06/2025 9,034                    8,169                    9,041                    7-                                                 9,034                            -   730                       872                       872                       142                      
AHP6 Mount Pleasant Project 30/04/2025 5,357                    4,900                    5,282                    75                                               5,357                            -   382                       382                       382                       -                       
AHP7 7-9 Gilmour Avenue Project 30/09/2025 733                       459                       467                       266                                               733                            -   264                       8                            263                       (1)
AHP8 Willox Park Phase1 Project 31/12/2025 5,531                    1,951                    3,313                    2,218                                         5,531                            -   2,980                    1,362                    3,398                    418                      
AHP9 Willox Park Phase2 Project 30/06/2027 5,355                    -                             1                            5,354                                         5,355                            -   100                       1                            100                       -                       
AHP10 Bank Street Project 31/12/2026 5,797                    297                       483                       5,314                                         5,797                            -   1,500                    186                       839                       (661)
AHP11 Bonhill Gap Sites Project 30/09/2026 9,521                    241                       656                       8,865                                         9,521                            -   1,600                    415                       5,145                    3,545                   
AHP12 Clydebank Health Centre Project 31/12/2027 15,642                  1,017                    1,186                    14,456                                     15,642                            -   375                       169                       380                       5                           
AHP13 Silverton Project 31/03/2027 2,889                    29                          29                          2,860                                         2,889                            -   100                       -                             50                          (50)
AHP14 Queen Mary Avenue Project 31/12/2026 4,540                    40                          223                       4,317                                         4,540                            -   800                       183                       1,000                    200                      
AHP15 Queens Quay Site C Project 31/03/2020 7,231                    31                          31                          7,200                                         7,231                            -   -                             -                             -                             -                       
AHP16 Dennystoun Forge – New Build Project 30/09/2027 4,129                    59                          61                          4,068                                         4,129                            -   400                       2                            400                       -                       
AHP17 28 Bridge Street Project 31/03/2027 810                       -                             -                             810                                               810                            -   60                          -                             60                          -                       
AHP18 Ottawa Crescent Project 30/06/2027 6,000                    -                             -                             6,000                                         6,000                            -   250                       -                             250                       -                       
AHP19 Future New Build & Related Regeneration Projects Rolling 31/03/2030 31,030                  -                             31,030                                     31,030                            -   550                       -                             -                             (550)
AHP20 Fees, Staffing Costs, contingency Rolling 31/03/2030 830                       -                             -                             830                                               830                            -   150                       -                             150                       -                       
Affordable Housing Supply Programme 171,129                50,146                  55,308                  115,821                171,129                0 15,113                  5,162                    17,962                  2,849                   
Total Expenditure 345,311                50,146                  67,105                  272,983                340,088                (5,223) 55,547                  16,959                  49,843                  (5,704)
Full Project Life
Page 178

Page 179

All Approved HRA Capital Projects at Period 05  _  31 August 2025 Appendix 2
Full Project Life
Project Category Planned
End Date
Revised
End Date
Project Life
Budget
Income
to 31/3/25
Income
to Date
Projected
Future Income
Project Life
Forecast Income
Project
Variance
Approved
Budget
2025/26
Income
to Date
2025/26
Projected
Income
2025/26
In Year
Variance
2025/26
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
CAPI1 Scottish Govt Buyback Grant Rolling 31/03/2030 (10,550) -                             -                             (10,550) (10,550) -                             (550) -                             (2,378) (1,828)
CAPI2 Clydebank East Project 30/04/2025 (12,605) (12,605) (12,605) -                             (12,605) -                             -                             -                             -                             -                            
CAPI3 Pappert Site Project 30/06/2025 (3,725) (3,475) (3,725) -                             (3,725) -                             (250) (250) (250) -                            
CAPI4 Mount Pleasant Project 30/04/2025 (1,838) (1,838) (1,838) -                             (1,838) -                             -                             -                             -                             -                            
CAPI5 7-9 Gilmour Avenue Project 30/09/2025 (311) (191) (191) (120) (311) -                             (120) -                             (120) -                            
CAPI6 Willox Park Phase1 Project 31/12/2025 (1,644) (1,644) (1,644) -                             (1,644) -                             -                             -                             -                             -                            
CAPI7 Bank Street Project 31/12/2026 (2,220) (258) (258) (1,962) (2,220) -                             (1,500) -                             (839) 661                      
CAPI8 Bonhill Gap Sites Project 30/09/2026 (3,748) (378) (378) (3,370) (3,748) -                             (1,600) -                             (3,360) (1,760)
CAPI9 Clydebank Health Centre Project 31/12/2027 (4,781) (966) (966) (3,815) (4,781) -                             (375) -                             (350) 25                         
CAPI10 Silverton Project 31/03/2027 (1,080) -                             -                             (1,080) (1,080) -                             -                             -                             -                             -                            
CAPI11 Queen Mary Avenue Project 31/12/2026 (2,040) (140) (140) 1,900-                    2,040-                    -                             -                             -                             -                             -                            
CAPI12 Queens Quay Site C Project 31/03/2020 (4,814) (2,086) (2,014) (2,800) (4,814) -                             72 72                          72 -                            
CAPI13 Dennystoun Forge – New Build Project 30/09/2027 (2,400) -                             -                             (2,400) (2,400) -                             -                             -                             -                             -                            
CAPI14 Future new build sites & related regeneration projects Rolling 31/03/2030 (24,711) -                             -                             (24,711) (24,711) -                             (60) -                             (60) -                            
CAPI15 Owners Recoveries Rolling 31/03/2030 (3,500) -                             1,168-                    (2,332) (3,500) -                             (1,500) (1,168) (1,500) -                            
CAPI16 Other Grant Rolling 31/03/2030 (406) -                             (832) (832) (1,664) (1,258) (406) (832) (1,612) (1,206)
CAPI17 HRA Loan Repayments Rolling 31/03/2030 (5) -                             -                             (5) (5) -                             (1) -                             (1) -                            
Total Income (80,378) (23,581) (25,759) (55,877) (81,636) (1,258) (6,290) (2,178) (10,398) (4,108)
Prudential Borrowing Requirement 264,933                26,565                  41,346                  217,106                258,452                (6,481) 49,257                  14,781                  39,445                  (9,812)
Full Project Life In Year
ITEM 17 - APPENDIX 2
Page 179

Page 180

Page 180

Page 181

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources 
Housing and Communities Committee: 19 November 2025
___________________________________________________________________
Subject: General Fund Housing and Communities Financial Report 2025/26
as at Period 5 (31 August 2025)
1. Purpose
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 31 August 2025 (Period 5) of General Fund Revenue
services under the remit of the Housing and Communities Committee.
2. Recommendations
2.1 Members are asked to
i) note the account currently shows a projected annual favourable variance
of £0.002m.
ii) note the progress on efficiencies incorporated into 2025/2026 budgets.
3. Background
3.1     Revenue Budget
Members agreed the 2025/2026 revenue estimates at the Council meeting on
5th March 2025.
A total net expenditure budget of £0.901m was approved for services under
the Housing and Communities services remit.
Budget Approved 5 March 2025
Gross
Expenditure
£m
Gross
Income
£m
Net
Expenditure
£m
Homelessness Services 5.069 -4.241 0.828
Private Sector Housing 0.016 - 0.016
Private Sector Housing Grant 0.425 -0.382 0.043
Anti-Social Behaviour & CCTV 0.535 -0.230 0.305
Housing Maintenance Trading Organisation 20.581 -20.872 -0.291
Total  26.626 -25.725 0.901
ITEM 18
Page 181

Page 182

4. Main Issues
4.1 Appendix 1 reports the forecast outturn for the services at £0.899m, a
projected favourable variance of £0.002m
4.2      The Homelessness service is the only service forecasting an adverse
variance. The current forecast is for a small overspend of £0.017m compared
to the previous forecast to August committee of a £0.099m overspend. August
committee was advised that homelessness service managers would review
service staffing levels and review rent recovery performance across homeless
lets to reduce overspends. The service has put in place a series of actions
that will improve financial performance and service managers will continue to
target further efficiencies that can eliminate the remaining overspend.
Appendix 2 provides a detailed analysis by service area.
Appendix 3 provides commentary of projected net annual variances greater
than £0.050m.
Appendix 4 shows progress on the delivering 2025/2026 saving options.
5. People Implications
5.1 There are no people implications.
6. Financial Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report.
6.2      Agreed efficiencies for 2025/2026 are monitored with current indications being
that all the budgeted savings of £0.222m will be achieved. (see Appendix 4) 
7. Risk Analysis
7.1 The present variances should be viewed in the knowledge that there are
several variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 All services involved in delivering the budgets have been consulted in the
compilation of this report.
Page 182

Page 183

10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer, Resources                      
Date: 19 November 2025
___________________________________________________________________
Person to Contact: Jim McCarron - Finance Business Partner,
16 Church Street, Dumbarton, G82 1QL
Telephone: 07772 322055
e-mail james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - Summary Budgetary Position (Revenue)
Appendix 2 - Detailed Budgetary Position (Revenue)
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Efficiencies/Savings Options
(Revenue)
Background Papers: None
Wards Affected: All
Page 183

Page 184

WEST DUNBARTONSHIRE COUNCIL Appendix 1
REVENUE BUDGETARY CONTROL 2025/26
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 31 August 2025
Actual
Outturn
2024/25
Total Budget
2026/26
YTD
Spend
2025/26
Forecast
Spend
2025/26
Annual
RAG
Status
Net Variance
attributable to
earmarked
reserves
spend
Underlying
Variance
excluding
earmarked
reserves
spend
£000 £000 £000 £000 £000 % £000 £000
687 828 115 845 17 2%  0 17
11 16 8 16 0 0%  0 0
41 Private Sector Housing Grant 43 19 43 0 0%  0 0
312 305 116 289 (16) -5%  0 (16)
0 (291) (97) (294) (3) -1%  0 (3)
1,051 901 161 899 (2) 0%  0 (2)
Housing Maintenance Trading Organisation
Total Net Expenditure
Service / Subjective Summary
Annual
Variance
2026/26
Homelessness Services
Private Sector Housing
Anti Social Behaviour & CCTV
ITEM 18 - APPENDIX 1
Page 184

Page 185

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2025/26
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 August 2025
PERIOD 5
Actual
Outturn
2024/25
Service Summary
Total
Budget
2026/26
YTD
Spend
2025/26
Forecast
Spend
2025/26
RAG Status
£000 £000 £000 £000 £000 %
14,172 Employee 14,748 5,714 14,035 (713) -5% 
2,564 Property 2,834 1,238 2,937 103 4% 
1,152 Transport and Plant 1,189 462 1,107 (82) -7% 
5,650 Supplies, Services and Admin 5,559 2,346 5,452 (107) -2% 
1,178 Payments to Other Bodies 1,267 456 1,279 1200% 1% 
1,019 Other 1,029 429 1,029 0 0% 
25,735             Gross Expenditure 26,626 10,645 25,839 (787) -3% 
(24,684) Income (25,725) (10,484) (24,940) 785 -3% 
1,051               Net Expenditure 901 161 899 (1) 0% 
£000 £000 £000 £000 £000 %
1,686 Employee 1,710 586 1,715 5 0% 
2,133 Property 2,352 979 2,369 17 1% 
14 Transport and Plant 14 4 12 (2) -14% 
78 Supplies, Services and Admin 68 25 80 12 18% 
840 Payments to Other Bodies 925 318 937 12 1% 
0 Other 0 0 0 0 0% 
4,751               Gross Expenditure 5,069 1,912 5,113 44 1% 
(4,064) Income (4,241) (1,797) (4,268) (27) -1% 
687                  Net Expenditure 828 115 845 17 2% 
£000 £000 £000 £000 £000 %
0 Employee 0 0 0 0 0% 
0 Property 0 0 0 0 0% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 0 0 0 0 0% 
11 Payments to Other Bodies 16 8 16 0 0% 
0 Other 0 0 0 0 0% 
11                    Gross Expenditure 16               8                 16                0 0% 
0 Income 0 0 0 0 0% 
11                    Net Expenditure 16               8                 16                0 0% 
Private Sector Housing
Annual
Variance
2026/26
Homelessness Services
All Services
ITEM 18 - APPENDIX 2
Page 185

Page 186

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2025/26
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 August 2025
PERIOD 5
Actual
Outturn
2024/25
Service Summary
Total
Budget
2026/26
YTD
Spend
2025/26
Forecast
Spend
2025/26
RAG Status
Annual
Variance
2026/26
£000 £000 £000 £000 £000 %
42 Employee 42 18 44 2 5% 
118 Property 177 96 177 0 0% 
0 Transport and Plant 0 0 0 0 0% 
-2 Supplies, Services and Admin 0 (1) (2) (2) 0% 
207 Payments to Other Bodies 206 80 206 0 0% 
0 Other 0 0 0 0 0% 
365                  Gross Expenditure 425 193 425 0 0% 
(324) Income (382) (174) (382) 0 0% 
41 Net Expenditure 43 19 43 0 0% 
£000 £000 £000 £000 £000 %
293 Employee 273 102 257 (16) -6% 
71 Property 141 59 141 0 0% 
0 Transport and Plant 0 2 0 0 0% 
0 Supplies, Services and Admin 1 0 1 0 0% 
120 Payments to Other Bodies 120 50 120 0 0% 
0 Other 0 0 0 0 0% 
484                  Gross Expenditure 535 213 519 (16) -3% 
(172) Income (230) (97) (230) 0 0% 
312                  Net Expenditure 305 116 289 (16) -5% 
………………………………………………………………………………………………………………………………………………………………………………………….
£000 £000 £000 £000 £000 %
12,151 Employee 12,723 5,008 12,019 (704) -6% 
242 Property 164 104 250 86 52% 
1,138 Transport and Plant 1,175 456 1,095 (80) -7% 
5,574 Supplies, Services and Admin 5,490 2,322 5,373 (117) -2% 
0 Payments to Other Bodies 0 0 0 0 0% 
1,019 Other 1,029 429 1,029 0 0% 
20,124             Gross Expenditure 20,581        8,319          19,766         (815) -4% 
(20,124) Income (20,872) (8,416) (20,060) 812 4% 
0 Net Expenditure (291) (97) (294) (3) 1% 
Housing Maintenance Trading Organisation
Private Sector Housing Grant
Anti Social Behaviour & CCTV
Page 186

Page 187

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Housing Maintenance Trading Organisation (291) (294) (3) 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
31 August 2025
Budget Details
Variance Analysis
Variance
The service will achieve its budgeted surplus
None available
Employee cost underspend due to vacant posts within the service. Property cost overspend
due to a reassessment of depot costs charged to the HMTO. Transport and supply cost
underspend reflecting lower employee numbers and reduced throughput of work undertaken
by HMTO.
Lower income reflects reduced delivery costs / reduced throughput of work.
This service delivers maintenance and investment services to the council's housing stock
ITEM 18 -
APPENDIX 3
Page 187

Page 188

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2026/26 - BCR05
Efficiency Detail Reference
Budgeted
Amount £'000
Projection of
Total Saved
£'000
Projection of
Total Not Saved
£'000
Comment
1 Reduce budget for temporary accommodation furniture HE03 18                        18 0
2 CCTV Service Reduction HE04 31                        31 0
49 49 0
STATUS: COMPLETE
ITEM 18 - APPENDIX 4
Page 188