Page 1

Authors: Craig Clement, Sheena Devlin, Colin Grant & Jennifer King 
Connecting for Success
- Shaping the Future
A Review of Education Services in Argyll and Bute
October 2025

Page 2

2     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     3   
1. Executive Summary and Strategic Service Improvement Recommendations    3
2. Background and Review Methodology    6
3. Review of Early Learning and Childcare    11
4. Review of the Additional Support Needs and Inclusion    16
5. Review of Primary and Secondary Provision: 
5.1  Secondary Strategic Collaboration and Pupil Choice    24
5.2  Leadership Model    28
5.3  Primary Staffing Standard    33
6. Review of Learning Estate    36
7. Education-Wide Support Staffing Synergies: A Strategic Proposal    41
8. Links to Council-Wide Priorities and Policies: Multi-Agency Partnerships    44
9. Summary of Areas for Potential Efficiencies    48
Appendices: 
1. Implementation Timeline    50
2. Engagement with Argyll and Bute Council and Partners    51
Contents

Page 3

2     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     3   
Section 1
Executive Summary and
Strategic Service Improvement
Recommendations
1.1  Purpose and Scope of Review
An independent review of Argyll and Bute’s Education Service was conducted from May to September 2025 in
line with the Council’s brief:
Having regard to the numerous challenges which are currently being faced by the Service, the Education Service
requires reassurance that its current Service design and delivery model is efficient and effective, and will deliver
improved outcomes for our children and young people, whilst providing Best Value and to support the Council’s
requirement to deliver financial savings on an ongoing year-on-year basis. The Service requires to explore its
options to review and redesign (if necessary) all aspects of its operations in this regard, in a manner which
could be feasible and permitted having regard to the national requirements and legislation which the Service is
subject to.
The background, aims, and methodology for the review are detailed in Section 2. The narrative evidence
base for strategic recommendations can be found in Sections 3-8. Options for shorter- to medium-term
efficiencies and savings are in Section 9 (noting that all savings will require appropriate lead-in times).
Strategic Recommendations
For ease of reference ten strategic recommendations for Service improvement made by the review team
are highlighted below. These recommendations take account of the need to support the Council’s vision. There
is a particular emphasis therefore on Best Value, Affordability, Sustainability, Performance and Collaboration. 
Further, the review team considers that implementing all ten recommendations, in a planned, incremental way,
will build stronger foundations from which to deliver better outcomes for children and young people across
Argyll and Bute. Once these are in place, it will be more straightforward to then identify the scale and scope
of any future efficiencies that may be achieved without affecting the local authority’s requirement to meet
statutory duties or providing a high quality service.
The main over-arching theme for all ten recommendations is one of the need for greater strategic
collaboration across all services and across partners. Strategic collaboration is vital because it unlocks
capabilities, resilience, and innovation that no single entity can achieve alone. Partners bring different strengths
– technical skills, local knowledge and expertise that when combined with Service expertise can help tackle
some of the more complex challenges faced by a large, rural local authority area such as Argyll and Bute.
Successful collaboration will be built on trust, mutual respect, and aligned aims – Connected for Success.

Page 4

4     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     5   
1.2  Ten Strategic Recommendations (2-4 year horizon)
1. Early Learning and Childcare
(Connect for Success – Mission & Purpose, Learning Council)
Working with community planning partners, re-envision the service to ensure it is sustainable and meets the
needs of local communities based on the principles outlined in Section 3 of the report.
2. Additional Support Needs / Inclusion – Workforce Model
(Connect for Success – Mission & Purpose, Employee Empowerment, Agile)
Carry out a comprehensive review of all support staff roles to design a workforce model aligned with the
principle that staff should be equipped with the skills to meet a diverse range of needs flexibly and sustainably,
across the varied contexts in which children grow and learn, with resources directed towards universal
provision where most children’s additional support needs are being met.
3. Additional Support Needs / Inclusion – Strategic Planning
(Connect for Success – Data & Evidence Driven)
Plan strategically for Additional Support Needs at all levels of implementation in the system, using more diverse
sources of data including from Partners. This could then inform workforce planning, curriculum development,
and the design of future learning environments that are both sustainable and offer best value.
4. Secondary Provision – Strategic Collaboration and Pupil Choice
(Connect for Success – Agile, Maximise Technology)
R4 - Through the establishment of a cross-school group of senior Secondary school leaders and central
officers, plan collectively for a reshaping of Secondary Timetabling models with the aim of increasing choice
for learners through full alignment. The recommended option would provide the greatest opportunity to access
a wider range of courses through maximising the use of current and emerging technology and facilitating
partnership arrangements. Planning should also look to enhance efficiencies in staff deployment and
strengthen the Authority overview in preparation for any national reduction in class contact time.
5. Leadership Model (Primary & Secondary)
(Connect for Success – One Council, Agile)
Plan, develop and implement a model of shared leadership across schools and clusters in response to the
challenges of recruitment, retention and succession planning relating to school leadership. Such a model
should include a different approach to business and finance support staffing allocation for primary schools;
should include all SNCT promoted posts and should take account of Recommendations 6 and 9.
6. Primary Staffing Standard
(Connect for Success – One Council, Agile)
Develop a new Primary Staffing Standard (for teaching staff) designed to ensure equitable and fair allocation of
staffing across all Argyll and Bute primary schools. The Standard should include weightings for socio-economic
factors (e.g. using ACORN Data or CFG registration); for exceptional ASN and for management time. It should
be reviewed every three years. The staffing allocations for schools should be reviewed annually in line with
this Standard, latest census figures, future pupil projections over a three-year period and should reflect the
national guidance on class sizes.

Page 5

4     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     5   
7. Learning Estate Strategy
(Connect for Success – Data & Evidence Driven)
Develop the existing Learning Estate Strategy (ideally linked to Council Strategy) as a matter of urgency.
The strategy should set out the current and medium-term challenges. It should recommend adopting the
Northern Alliance Toolkit tailored to meet the needs of Argyll and Bute. It should also set out an approach for
undertaking place-based reviews on a phased basis, and identify immediate priorities based on clear criteria.
8. Integrated Facilities Management
(Connect for Success – One Council)
Commit to developing an integrated Facilities Management Service, set up a Project Board to design and
deliver this and agree a timescale for implementation.
9. Education-Wide Synergies
(Connect for Success – Employee Empowerment, Agile)
Adopt a strategically coordinated, locally empowered hybrid support staffing model for all non-teaching posts
across all sectors to ensure holistic strategic oversight.
It is recommended that: the Head of Education Performance and Improvement lead a multi-disciplinary project
team; wide engagement is undertaken with school leaders, staff, trade unions, and central teams; the Scottish
Approach to Service Design methodology is adopted to ensure collaborative design and implementation.
10. Multi-Agency Partnerships
(Connect for Success – One Council)
Commitment from multi-agency partners and shared analysis of data to inform planning will be required in
order to address the current and longer-term challenges of making provision for children and young people
who have complex social and emotional needs (which are strongly related to their family circumstances).
Governance at Community Planning and Corporate levels could strengthen multi-agency approaches such as
a Single Point of Access for Families and Transition Planning for children and young people’s additional support
needs at key stages (Early Years and Post-School).
Implementation
These recommendations are designed for phased delivery over 2-4 years and subject to the Council’s Equality
Impact Assessments, with some enabling shorter- to medium-term efficiencies and savings once lead-in
requirements are met. An indicative timeline for this transformation work is outlined in Appendix 1.

Page 6

6     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     7   
Section 2
Background and Review
Methodology
2.1  Introduction
1. Argyll and Bute wished to conduct a Review of the Education Service, focusing on the Service Areas as set
out in the table below (with the exception of COVID-19). In addition, an aim of the Review was to examine
options that may be open to the Council in terms of efficiencies and effectiveness relating to staffing and
the school estate.
Service Area 2023-24 2022-23
Additional Support for Learning £11,064,004 £9,874,434
Central/Management Costs £1,708,953 £1,475,608
Community Learning and Development £13,031 £9,621
COVID-19 £0 £414,000
Early Learning and Childcare £9,113,337 £8,324,462
Primary Education £37,705,315 £34,433,155
Pupil Support £2,323,832 £2,169,359
Schools – Central Services £2,491,243 £2,664,559
Secondary Education £37,252,847 £34,283,471
£101,672,562 £93,648,669
2. Scottish Education is currently undergoing a significant period of reform. This situation is reflected in
Argyll and Bute, and options for the future delivery of the Service.
3. Having regard to the numerous challenges which are currently being faced by the Service, Argyll and Bute
Council requires reassurance that its current Education Service design and delivery model is efficient and
effective, and will deliver improved outcomes for their children and young people, whilst providing Best Value
and to support the Council’s requirement to deliver financial savings on an ongoing year-on-year basis.
The Service requires to explore its options to review and redesign (if necessary) all aspects of its operations
(as defined in the table above) in this regard, in a manner which could be feasible and permitted, having
regard to the national requirements and legislation which the Service is subject to.
4. Argyll and Bute Council’s Education Service sits under the Executive Director with responsibility for Legal
and Regulatory Support, Commercial Services and Education.

Page 7

6     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     7   
5. There are two Heads of Service for Education for: Wellbeing, Inclusion and Achievement; and for
Performance and Improvement, with the former also being the Council’s Chief Education Officer.
6. Argyll and Bute covers the second-largest geographical area of any Scottish Council. The Council area
adjoins those of Highland, Perth and Kinross, Stirling and West Dunbartonshire. Its border runs through Loch
Lomond. Argyll and Bute has the third sparsest population density (0.12 persons per hectare). The population
of around 86,000 is distributed across an area of just under 2,700 square miles. More than half of Argyll and
Bute’s population live in rural areas, as classified by the Scottish Government’s Urban-Rural Classification
(2016). A further 35% live in communities with populations between 3,000 and 10,000 people, designated as
small towns. Less than a fifth of the population live in an urban area with a population of over 10,000 people.
7. There are currently 23 Argyll and Bute schools located on islands, which is more than any other Scottish
local authority, including the three islands authorities (Orkney Islands Council, Shetland Islands Council and
Comhairle nan Eilean Siar). The geography provides unique challenges for service delivery, in Education
and other Council services. A decline in population experienced to date, and that projected in the future,
presents a significant challenge to the overall viability of the area. This challenge is made more difficult by
the variation in population changes over the areas within our Local Authority. The Scottish Index of Multiple
Deprivation (SIMD) has been used to identify pockets of overall deprivation within Argyll and Bute. Based
on the SIMD 2020, 10 data zones in Argyll and Bute are in the 15% most overall deprived data zones in
Scotland. Eight data zones are in the 15% most employment deprived data zones. In 13 of Argyll and Bute’s
data zones, more than 10%, are in the 1% most access deprived data zones. The most access deprived data
zone in Scotland covers the islands of Coll and Tiree. Due to the fact that SIMD identifies concentrations of
deprivation, smaller pockets and instances of individual deprivation are not picked up by the index.
8. In session 2022/23 Argyll and Bute had approximately 5,380 pupils in primary schools, 4,580 pupils in
secondary schools, 40 in complex additional support needs school, and 1,590 children in Early Learning and
Childcare settings.
The primary and secondary school rolls are both projected to fall over the course of the next five years, based
on current data. Notwithstanding this, at the time of writing, the roll within specialist ASN provision is rising.
9. The Education Service currently employs approximately 2,170 members of staff.
10. The following disciplines sit under each of the Heads of Service:
Head of Education – Wellbeing, Inclusion and Achievement
• Leadership Development
• Additional Support Needs
• Developing Scotland’s Young Workforce
• Youth and Adult Services (Delivered by an ALEO)
• Education Psychology Services
Head of Education – Performance and Improvement
• Curriculum (2-18 Years)
• Early Learning and Childcare
• Performance, Improvement and Collaboration
• Gaelic Education

Page 8

8     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     9   
2.2  The Context for the Education Service
1. The vision statement for education in Scotland is All Learners in Scotland Matter. Argyll and Bute’s
vision and strategy for Education, ‘Our Children, Their Future’, echoes this with the vision of making Argyll
and Bute the best place to grow up. The shared vision is to realise ambition, excellence and equality for all.
The Education vision is underpinned by the values: respect, openness and fairness. This vision is delivered
for all children through the following six key objectives:
• Raise educational attainment and achievement for all;
• Use performance information to secure improvement for children and young people;
• Ensure children have the best start in life and are ready to succeed;
• Equip young people to secure and sustain positive destinations and achieve success in life;
• Ensure high quality partnership working and community engagement;
• Strengthen leadership at all levels.
2. The new vision Our Children, Their Future, Thriving Together was approved by the Community Services
Committee on 6th March and has five key central priorities:
• Best Start for Learners
• Ambitious Learners
• Nurtured Learners
• Connected Learners
• Lifelong Learners
3. The Education Service is currently responsible for:
• 65 primary schools (49 with ELC provision) – four of which are denominational primary schools.
• Four stand-alone nurseries (one outdoors)
• 21 ELC partner providers
• Five 2-18 schools
• Five secondary schools
• One school for pupils with complex additional needs.
4. Gaelic Medium Education (GME) is available in five Early Learning and Childcare (ELC) provisions: GME is
available in seven primary schools.
5. Eight of the Council’s schools operate under a PPP variant model (NPDO) where elements of Facility
Services are delivered on an outsourced basis.
6. There are currently 13 shared headship arrangements in place in Argyll and Bute, with 28 schools subject
to those arrangements.
7. 47 schools within Argyll and Bute are listed by the Scottish Government as being very remote rural schools.
8. The Education Service budgets for 2022-23 and 2023-24 (as at 1st April each year) were as outlined in
Section 2.1

Page 9

8     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     9   
9. In this context, the purpose of the review was to consider how best the Council’s vision can be realised
with particular emphasis on:
•  Best Value/Affordability – the service needs to be affordable to the council.
•  Sustainability – service improvements and changes need to be sustainable in the medium and longer term.
•  Performance – the service needs to work with all partners to achieve the best outcomes for children,
young people and their families.
•  Collaboration – the service should consider all opportunities to work with other council services,
partners, national organisations and local communities to enhance service delivery and improve
outcomes.
2.3  Scope of the Review Programme
Based on the briefing provided by the Council and related communications, the scope of the review was set
out as follows:
• Review of Early Years provision in the context of learning estate, partner provision, capacity, and staffing levels.
• Consider the appropriateness of the current design and delivery models in Primary, all through and
Secondary settings with particular reference to staffing - teaching and non-teaching.
• Consider current issues with the Learning Estate including configuration of assets, floor area, arrangements
for Facilities Management and how the service is organised within the Council and the role played by
partners e.g. SFT, HubCo. Consider opportunities to improve effectiveness including evolving use of a Place
Based Approach, to provide a ‘fit for purpose’ learning estate.
• Consider the strategic planning and provision for pupils with Additional Support Needs, including longer
term projections and partnerships, taking account of legislative duties.
These Workstreams are interrelated and there was scope to evolve the work of each one as the review
proceeded.
2.4  Methodology
1. The approach to undertaking the Review was tailored to meet the needs of the Council and the required
outcomes and objectives. Cognisance was also taken of the timescales, resource availability and the
council’s budget-setting process. The methodology below was adopted, wherever possible co-producing
options and proposals:
• Engaging with senior leaders, and a wide range of staff, Partners and young people to determine good
practice and potential areas for change and improvement.
• Reviewing arrangements for Quality Assurance/Improvement and performance management (including
information and performance systems), undertaking further analysis where required.
• Undertaking benchmarking in respect of budget and staffing (teacher and where appropriate support
staff) particularly with the Family Group (for services set out in para 2.8 of brief); and identify options to
improve best value.
• Critical analysis of data provided to the Review Team by the Education Service.

Page 10

10     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     11   
• Embracing the seven key principles of the Council’s Connect for Success transformation programme
which were routinely referenced throughout highlight reports to the board:
CS1 One Council One Place  CS2 Purpose and Mission Focus
CS3 Employee Empowerment CS4 Data and Evidence Driven
CS5 Learning Council CS6 Agile
CS7 Maximise Use of Technology
2. In addition, the Team drew on methodology and tools from The Scottish Approach to Service Design
(SAtSD) - gov.scot for workshops which focused on Staffing; Early Years; and Partnerships for Additional
Support Needs. Colleagues across the Council and many partners engaged positively and a number of
solutions to current challenges were defined and developed. These workshops proved very instructive in
helping to shape future delivery recommendations. The team commends further use of this methodology
as a Council wide approach to Service design.
DISCOVER DEFINE DEVELOP DELIVER
The Double Diamond
Design With People, Not For People
Design the right things Design the things right

Page 11

10     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     11   
Section 3
Early Learning and Childcare:  
Re-Envisioning Provision Across
Argyll and Bute
3.1  Overview of Early Learning and Childcare
1. A wide range of settings are available for families within Argyll and Bute. There is comprehensive provision
across the area available in 98 settings. The Council operates four Standalone settings (managed by Centre
Manager), one Outdoor nursery and 49 settings within schools (managed by Head Teacher). In addition
there are 21 private/voluntary partners (including one outdoor) and 22 Childminders.
2. At present partner rates are £9.04 per hour for two-year-olds and £7.98 for three-year-old and above.
3. There are five settings that are open during school holiday periods (for provision of 1,140 hours) and five
settings where parents can pay for additional hours. The current charge is £6.33 for over twos and £6.83 for
under twos.
4. As at September 2024 the number of children receiving a service is outlined below:
Locality N3 N4 N5 Total
Bute & Cowal 31 140 224 395
Helensburgh & Lomond 28 198 252 478
Mid Argyll, Kintyre & the Islands 17 170 179 366
Oban, Lorn & the Isles 21 193 240 454
Grand Total 97 701 895 1,693
5. The Local government Benchmarking Framework indicates the costs of providing the service are relatively
high. In 2023/24 (last year data was published) the cost per pre-school education place is £15,310 which
is considerable higher than the Scottish average of £11,659, and indeed is almost the highest of all Scottish
local authorities. It is recognised there can be a number of reasons for this, but it does highlight there is a
need to undertake more detailed benchmarking analysis to fully understand costs. It also indicates there
may be opportunities to reduce costs without impacting on the quality of service.
R1 - Working with community planning partners, re-envision the service to ensure it is sustainable
and meets the needs of local communities based on the principles outlined below.

Page 12

12     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     13   
6. In terms of quality, it was noted as at February 2025 that 89% of settings are meeting the national standard.
While this is a reduction from late 2024/early 2025 (which ranged from 92%-95%) it is still in line with the
Scottish average.
7. The LGBF indicates that 87.3% of 27-month-old children meet their Developmental Milestones which
compares favourably to Scottish average of 83.3%. The ELC Team also measure milestones for N5’s and at
June 2025 61% achieve stage 2. It is noted there is a decline in children meeting developmental milestones.
This data could be used as part of a process to develop the service (not least a renewed focus on early
intervention) and to allocate resources based on need (see below).
8. In terms of estate management as with schools, there is no policy regarding sustainability of small ELC
settings. It is noted there are two settings where provision has been paused in the last three years where
there were no children registered. The Education Service does not ‘mothball’ settings proactively, rather it
depends on community demand.
9. Based on information provided to the Review Team and visits, local authority and partner settings are
well resourced and supported by the central team, with a comprehensive package of professional
learning in place.
10. The Central Team are well led and have support from senior colleagues. The team consists of an Education
Manager, Education Officer, three Education Support Officers, three Early Years (EY) Development Officers,
1.6 EY Teachers, 2.6 EY Family Support Workers and five Excellence and Equity Leeds. They are a coherent
team and clearly understand the issues being faced by the service and have good knowledge of the area
and individual settings, with a commitment to the vision and values around ‘our children, their future’. They
are also committed to partnership working not least with Health and Social Care partners, albeit this can
be challenging and there are opportunities to improve the current position.
11. It is recognised that the approach to expansion of ELC to 1,140 hours was based on using existing provision
which was a cost effective model from a capital perspective, and also pragmatic. It also ensured partners
have a full role to play in providing services and their business model was not threatened by council
expansion.
3.2  Service Strengths
1. The Central team are well resourced and have extensive knowledge of in house and partner provision, and
provide extensive CPD opportunities.
2. There are some good examples of joint work with partner providers and there is good process in place for
agreement of ‘partner rate’.
3. Excellent use of outdoor settings and blended placements is made.
4. The ELC Team are solution focused to meet operational difficulties e.g. staffing, particularly in remote areas.
5. There is a clear focus on quality and equity.
6. ELC settings are well staffed.
7. Effective use of childminders is made, particularly in remote areas (there are currently around 36
registered places).

Page 13

12     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     13   
3.3  Service Challenges
Given the demographic, social and financial challenges the Council is facing, changing some aspects of the
service could provide financial sustainability, improve quality and be closer aligned to other services. Within
this wider context the following challenges need to be considered:
1. The cost of the service is significant and unlikely to be sustainable.
2. There are concerns regarding the quality of training of ELC staff via college providers.
3. There is no clear pathway through Health for Additional Support Needs and Early Years (as required by the
Additional Support for Learning Act) and so the Local Authority are not routinely alerted about a child’s ASN
other than exceptional medical/healthcare needs where adaptations to the setting may be required (no
more than about three per year). This is becoming more acute as needs grow.
4. Variation in quality of ELC settings has been evidenced by HMIe and the Care Inspectorate.
5. Different management models are currently in place across settings.
6. There is inconsistency in delivering wider objectives e.g. family learning. It was noted while the condition of
buildings is generally good (suitability also reasonable) there is little scope for family learning and joint work
with other services/organisations due to space and layout limitations in ELC settings.
7. There are constraints to delivering a multi-agency approach to family learning and early intervention.
8. There are particular demographic challenges for ELC not least given very small numbers and roll projection
are downwards in certain localities. There is also a need to improve roll projections. The cost of sustaining
a large number of settings with a very small number of children will have a disproportionate impact on
council resources e.g. core staffing will be required and lifecycle maintenance will be the same regardless
on number of children.
9. There will also be concerns regarding maintaining quality of service in very small settings.
3.4  Opportunities for Improvement
The service is currently in a stable place and well resourced. However, given the challenges being faced there is
a need to re-envision the service.
There is an opportunity to build on the good work with partner providers (including Childminders) to consider
evolving the services to meet the needs of local communities and the wider ambitions of the Council in a
sustainable way. Ideally this process of review should be undertaken in association with Community Planning
partners.
It is recognised that there are particular circumstances in Argyll and Bute, and the development of the service
would need to reflect this. However, a clearer strategy, linked to partner services, can provide the framework to
improve the lives of children and young people across all communities.
A possible way forward is as follows:
1. As noted above, Management responsibility (role of Centre Manager/Head Teacher) varies and there is
currently a mixed model of provision. While both models have merit there is an opportunity to review these
delivery options and consider how current arrangements can be adapted to meet local need.

Page 14

14     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     15   
2. As an example, services provided by Stand-alone/Hubs (currently open 48 weeks per annum) could be
extended and used as a base for partnership work, not least around the needs of families. The standalone
settings could also be used for extended hours during term time and during the school holidays. Where
appropriate there would be charges for extended hours (as noted above there is currently some provision
for this). This ‘family centre’ model would enable the development of an early intervention framework for
children 0-5. The school-based provision would generally be for children aged 3-5 over three terms.
3. Where settings are managed by a Head Teacher it would also be helpful to clarify the post’s responsibilities
and how Head Teacher support (6.56) should be utilised.
4. It is recognised there are a number of recruitment difficulties which would also need to be overcome.
A review would enable management roles and grades to be reassessed. This could include reporting
relationships with the central team and levels of empowerment.
5. Services should be developed on a locality basis. Once localities (e.g. Helensburgh) have been prioritised
(on a phased basis) the following factors would be considered:
• Current and projected demand for places.
• Current availability of places (LA standalone, part of school, partner and childminder) and any
information on potential changes.
• Condition and suitability of the current learning estate and other potential locations.
• The level of inequality/deprivation, considering SIMD position (potentially linked to PEF) and local data
e.g. developmental milestones.
• Economic Development and Employer/Employee requirements – including seasonal working.
• Additional Support Needs provision and requirements.
• Requirements of NHS and HSCP.
• Consider potential partnership with 3rd sector/Local voluntary provision.
• Other local factors.
6. Effectively this would involve undertaking a comprehensive review of current provision within a locality and
by taking a holistic view, consider how it might be improved. It should be emphasised that the providers
would be key partners in such a process. Ideally this would be part of a wider Place Based Review, but it is
recognised this may not be possible in the short term.
7. Current provision would be mapped and consideration would also be given to current and future demand
for services. This would include facilities and pathways for children with Additional Support needs, and
related requirements in respect of equity and equality (including support for wider family), all of which
would require input from community planning partners.
8. There is also potential to consider employee and employer requirements which in a number of cases may
include demand for seasonal provision. This approach would enable a structured approach to developing
creative solutions and empower local stakeholders to be part of the process to identify solutions. For
example, is there an opportunity to make more effective use of buildings, a need to train more childminders,
adjust or extend opening times (with possible cost to parents) to meet local requirements.
9. With a more flexible staffing model in an empowered system, local solutions could be developed which are of
high quality, support working parents and contribute to the sustainability of rural and island communities. In
some localities it is recognised cognisance will also need to be taken of any cross-boundary arrangements.

Page 15

14     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     15   
Implementation Timeline
Implementation of these recommendations is dependent on the extent to which the Council wishes to adopt
and integrated early intervention model which takes into account engagement with partners. If implementation
is with Education only, the locality work could be undertaken in 18 months on a phased basis.
3.5  Conclusion
Argyll and Bute’s model for Early Learning and Childcare (ELC) has delivered comprehensive access and
stability, but is increasingly challenged by demographic decline, financial pressures, workforce issues and
quality variation. Given the Council vision and objectives, particularly in terms of equity and equality there
is an opportunity to re-envision the Early Years service to provide universal services, but also provide more
emphasis on early intervention and meeting the wider needs of communities via a more targeted, place-based
strategic approach. This is already happening in some locations, however, structured partnership work and
locality planning, supported by more flexible staffing models and community empowerment, would enable
current good practice to be embedded, realise educational and community benefits, and ensure the service is
sustainable over the medium term.

Page 16

16     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     17   
Section 4
Additional Support Needs
and Inclusion
4.1  Overview
1. The focus of this workstream was to review the strategic planning and provision for Additional Support
Needs (ASN)/Inclusion including longer term projections and accounting for legislative duties.
2. The findings are closely related to the other workstreams through well-established research findings that
the inclusion of children and young people with Additional Support Needs (ASN) in their local communities
depends on:
• strong and supportive leadership of change.
• teachers who are trained in inclusive pedagogy and view it as their role to teach all learners in a
diverse classroom National Framework for Inclusion - The General Teaching Council for Scotland
(gtcs.org.uk)
• workforce planning and professional development including support staff (Deployment of Teaching
Assistants | EEF)
• the effectiveness of partnerships with other agencies and with parents (Pupils with complex additional
support needs): research into provision - gov.scot (www.gov.scot)
• and the accessibility of the school estate (Scottish Government Learning Estate Strategy 2021)
3. Also, the national policy context with regard to ASN over recent years has indicated that local authorities
should take account of The Morgan Review (2020) and The Hayward Report (2023) in relation to the
accessibility and ‘flexibility of different pathways to promote inclusion particularly for learners with
additional support needs’ (Hayward, 2023). Education Services should also have due regard to key areas of
legislation/policy including the Presumption of Mainstreaming Guidance (with regard to the Education 2000
Act); the Additional Support for Learning Act (2004, amended 2009); and the Equalities Act (2010).
R2 - Carry out a comprehensive review of all support staff roles to design a workforce model
aligned with the principle that the workforce should be equipped with the skills to meet a diverse
range of needs flexibly and sustainably, across the varied contexts in which children grow and
learn with resources directed towards universal provision where most children’s additional support
needs are being met.
R3 - Plan strategically for ASN at all levels using more diverse sources of data. This could then inform
workforce planning, curriculum development, and the design of future learning environments that
are both sustainable and offer best value.

Page 17

16     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     17   
4. In line with the national trend, Argyll and Bute’s data shows a steady increase in the number of children
recorded as having Additional Support Needs over the last five years, with 39% currently identified as
having at least one ASN which is similar to the Scottish average of 40%. There are marginal differences
between three school community clusters, with the HALCO cluster having the lowest recorded levels of
need. The number of recorded needs increases from early primary through to the senior phase.
5. The main factors giving rise to children and young people’s additional support needs are related to their
social and emotional wellbeing and their barriers to learning as seen in the table below. The majority of
support for children and young people’s needs is provided universally through class teaching (60% in
Primary and 55% in Secondary) with support staff providing additional support to 49% of primary-age
children who have ASN and 41% of secondary-age young people who have ASN. This is based on analysis
of data which the Education Service made available to the Review Team.

Page 18

18     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     19   
6. In response to the analysis of ASN data and Council-wide survey (2022), the first phase of the ASN
Provision strategy (2023) for a Place-based Approach to supporting children and young people’s needs is
underway, including an additional four Learning Centres for children and young people with complex needs
being opened in 2024-25; and central team restructuring which aims to build capacity in local community
school clusters. Implementation of Phase 2 is intended for 2025-26 with provision to support young people
with complex social and emotional needs including those at risk of being placed out with the authority.
7. Whilst the outcomes for children with Additional Support Needs follow the national trend of an overall
gap in attainment, for some children and young people in Argyll and Bute there are improvements, such
as: a significant reduction in Exclusions through implementation of Nurture (OCTNE); a slight increase
in attainment over five years for school leavers, particularly those in S6. Notably, outcomes for Care
Experienced Children and Young People (CECYP) show improvements.
8. What is not yet known is the extent to which children and young people with ASN are represented in
the improved ACEL data (Progress and Impact Report 2023-24), which deserves further consideration,
particularly for schools with above average numbers of children with ASN.
9. However the development of school dashboards for ASN which are at an early stage, have the potential to
provide more detailed and intelligent analysis of ‘what works’ for children and young people with ASN when
data is correlated with other sources, e.g. Quality Improvement processes; the nature of support which is
provided; HMIe evaluations; SNSA data; and specific progression frameworks such as SCERTS (for social
communication and emotional regulation support).
10. Nevertheless, the gap in being able to determine the effectiveness of a local authority’s approach to ASN is
also a challenge for Argyll and Bute Council: ‘in continuing to evaluate how education is funded, staffed and
assessed to support all pupils to reach their full potential, they also need to consider the continual growth in
pupils requiring ASL within their wider approach to improving child development.’ (Audit Scotland, 2025)
11. The current budget allocated to ASN provision amounts to £13,016,151, with over half of this spent on ASN
Assistants in schools. A recent review of how Support Staff are allocated to schools is an initial step in
making the most effective use of available resources with a primarily formula-based model that maintains
fairness and stability.
4.2  Strengths and Challenges
It is within this wide context that the current strengths and challenges have been identified which influence
Strategic Planning and Provision for Additional Support Needs/Inclusion; and where opportunities for
improvement can be made.
4.2.1  Leadership of Change
1. Strategic leadership of change regarding ASN has been informed by robust data analysis and wide-ranging
stakeholder consultation, aligned with relevant legislation (as referred to previously). The council-wide
survey (2022–23) has guided the establishment of additional learning centres across localities; led to an
initial review of support staff which is better fit for purpose; and improved equity of access to targeted and
specialist support in local communities.
2. The Learning Centres were included in Phase 1 of the ASN Strategy with the aim of making provision for
including children and young people with more complex needs in their locality, and minimising the need
for travel. The difference in demographics across Argyll and Bute, including school buildings, has meant

Page 19

18     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     19   
that there is variation in the use of learning spaces, as well as which children access support through the
Learning Centres. In a few cases there are challenges in managing the ‘competing’ needs of children with
regard to their developmental age and stage; their curriculum; and their peer group.
3. The recent restructuring of the central Inclusion and Equalities Team, though in its early stages, has been
designed as a locality-based model for strategic leadership and improvement in ASN/Inclusion, with the
aim of addressing some of the challenges referred to above. Recent recruitment to Principal Teacher
posts across localities, which are managed by the central team, intends to support practice at school and
cluster levels. This is strengthened further with close collaboration with the Educational Psychology Service
which has driven some of the preventative approaches to meeting children and families’ needs, such as
Addressing Non-Attendance; Nurture (Our Children, Their Nurturing Environment); and a Single point of
Access for Families.
4. At the school cluster level, leadership of change regarding ASN/Inclusion appears to be more variable as
suggested by the analysis of dashboard data in relation to quality improvement indicators and from focus
group feedback gathered during the course of the review. This variability has been highlighted by the recent
Review and Realignment of Support Staff Allocation which has challenged perceptions of how the diversity
of children and young people’s additional support needs should be met across different settings and what
type of support should be in place based on the assessment of needs at class and school levels as well as
for individuals.
5. While school leaders of ASN/Inclusion have welcomed the strategic direction of change towards a place-
based model of support, the confidence and willingness of some to do so, may be related to factors such
as staff skills and experience, and the need for a better understanding of what the data in relation to
additional support needs means.
4.2.2  Analysis of More Meaningful Data
1. Evidence of continuous improvement at the school level is primarily drawn from national performance data
sources such as ACEL, SQA, and the Seemis census. While these datasets have enabled the development of
dashboards to support and challenge schools, there remains a gap in interrogating this data from a broader
achievement perspective for children and young people with more complex needs who are supported in
Learning Centres.
2. The valuable support provided by the Data Analysis Officer to schools and the Inclusion and Equalities
Team provides a strong basis for unpacking some of the generalisations about the quantity and nature of
additional support needs. There is a risk that by focusing on the percentage value of ASN in schools, the
perceived need for support provided by ASN Assistants is escalated without there being any evidence that
it makes a positive difference to children’s progression.
3. By adopting a more diverse and nuanced approach to data analysis, the service could more effectively
demonstrate the value of additional support within their staged intervention framework. This would also
help broaden stakeholder understanding of what constitutes an additional support need and provision
which is effective at universal as well as targeted levels.
4. Analysis of data sampled from one school cluster (see next page) offers a means of interrogating a wider
range of indicators and which could encourage Leadership of Change at the school community level. It can
help refine the definition of Additional Support Needs (ASN) and demonstrate how effectively children’s
needs are being met through Universal classroom support.

Page 20

20     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     21   
How do we know what’s making a difference for children with additional support needs?
PRIMARY SCHOOL A
FME %
0%
Roll 2024/25
11
Teachers
2
Total support assistant hrs
29.5hrs
ASN no.
7
% ASN
64%
Attendance
92.50%
ASN Reasons: Dyslexia; SEBN           ACEL Benchmarking: 100% Ahead           Exclusions: 0
HMIe: Good/Satisfactory
18%
PRIMARY SCHOOL B
76 7.2 66.75hrs 55 65% 93%
ASN Reasons: SpLD; Dyslexia; Family           ACEL Benchmarking: 73% Ahead; 27%Behind            Exclusions: 0
Very Good HMIe:
3%
PRIMARY SCHOOL C
30 2.8 14.5hrs 5 17% 93%
ASN Reasons: SpLD           ACEL Benchmarking: 100% Ahead           Exclusions: 0
Good HMIe:
0%
PRIMARY SCHOOL D
14 2.4 34.5hrs 4 31% 96%
ASN Reasons: Dyslexia           ACEL Benchmarking: 100% Behind           Exclusions: 0
Satisfactory 2024HMIe:
5%
PRIMARY SCHOOL E
110 8.8 92.25hrs 49 45% 92%
ASN Reasons: SEBN           ACEL Benchmarking: 80% Behind; 20% Ahead           Exclusions: 0
Good 2022HMIe:
14%
PRIMARY SCHOOL G WITH LEARNING CENTRE
217 17.8 633.75hrs 1.91 34% 93%
ASN Reasons: ASD; Communication; Disability           ACEL Benchmarking: 20% Ahead; 80% Behind           Exclusions: 0
#HMIe:
13%
PRIMARY SCHOOL H
205 10.5 163hrs 66 39% 91.20%
ASN Reasons: EAL; LAC           ACEL Benchmarking: ACEL just above LA average           Exclusions: 0
#HMIe:
CLUSTER SECONDARY SCHOOL WITH LEARNING CENTRE
990 78.6 665hrs 405 41% 84.90%
ASN Reasons: Dyslexia; SpLD; SEBN; ASD; Young Carers; Disability           ACEL Benchmarking: 100% Ahead           Exclusions: 0
#HMIe:
14%
Note: #
are schools which have not had
an inspection in the last 5 years so no data available.

Page 21

20     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     21   
5. By interrogating the profile of schools in a cluster and across the authority, school leaders and Quality
Improvement Officers can ask questions about what the triangulation of data suggests, as well as what is
missing. The Education Service’s Data Analysis officer has already undertaken work with some schools in
relation to measures which would track and monitor the incremental but significant steps which children
with complex needs make. This will have relevance to all of the schools with Learning Centres which support
children at a pre-early level stage. Use of such data to measure outcomes and assess the impact of
additional support on children’s development and progression aligns well with the authority’s place-based
approach.
6. However, there is a gap in data analysis for children in the Early Years with Additional Support Needs which
requires systematic joint analysis of Early Years data with Health Services. Current limitations, such as
Health Visitor (HV) staffing constraints, restrict the capacity to use projections for long-term planning.
Data for children aged 0-2 with disabilities remains very limited. As already referred to in Section 3 there
appears to be no established pathway for ASN in Early Years which should be addressed.
7. Even so, ELC staff are supported with their professional learning to address children’s ASN through ASN
Locality Networks (online), coordinated by the Educational Psychology Service (EPS) with Allied Health
Professionals (AHPs) in attendance. These networks have supported Early Learning and Childcare (ELC) staff
to reflect on their inclusive practice through Solution Circles. Officers report these networks are valuable
for peer support but would benefit from expansion into a place-based model within local communities.
4.2.3  Workforce Planning and Professional Development
1. Building a highly skilled workforce to support and challenge schools on inclusive best practice is essential to
fostering a culture of equity. The restructuring of the Inclusion and Equality Team aims to better meet these
needs and optimise the role of pupil support teachers. The plan for Lead ASN Assistants is creative and
should be taken in account within the wider workforce planning. (See Section 7)
2. In order to support school leaders in the implementation of Learning Centres, a specialist network
facilitated by the Education Support Officer (ASN) provides peer support and a means of moderating
practice across the different localities. Staff attending this network report how valuable it is for their
professional learning and school improvement planning. However, the resilience and wellbeing of some staff
who are leading on ASN at school level can be affected by wider organisational factors which are explained
in further detail in Section 5.2.
3. Alongside the network for leaders of ASN/Inclusion, there is a comprehensive range of Professional Learning
opportunities facilitated by the Inclusion and Equalities Team, Educational Psychology Service and Rights
& Wellbeing Manager which have been developed in response to data-analysis of children’s needs and the
required staff skills. These include: Child Inclusion Research into Curriculum Learning Education (CIRCLE)
resource; Rights Respecting Schools; Nurture (OCTNE); Addressing Non-Attendance.
4. The place-based approach to inclusion has informed the new ASN Assistant allocation model, enabling
more effective control of the budget. Involvement of Head Teachers in this process is expected to
strengthen collective ownership. However, some Head Teachers would welcome more active participation
in the review of support staff which is relevant to the wider recommendations for Staffing and Leadership
in Section 5. The Deployment of Teaching Assistants (EEF, 2025) offers an evidence-based framework for
implementation.

Page 22

22     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     23   
5. Related to this, support staff roles (Classroom Assistant, Pupil Support Assistant, ASN Assistant) have not
been reviewed for many years. They no longer reflect the evolving demographics, nature of children’s needs,
or the skillsets required - particularly in remote rural areas. This is addressed in more detail in the Staffing
Section 7.
6. Workforce planning must also consider joint assessment and support planning with Health and Social
Work for non-statutory targeted needs, bearing in mind that approximately 420 school-age children have
a disability. The introduction in HSCP processes of a tiered approach prioritising safety may constrain
preventative or developmental work. This raises questions about the sustainability of joint priorities such as
ANA (Addressing Non-Attendance), Neurodivergent Pathways, and the Single Point of Access for families.
4.2.4  Participation of Parents, Children and Young People
1. Argyll and Bute Council’s Parental Involvement & Engagement Strategy has been reviewed recently, and
the membership with ‘Connect’ has enhanced engagement with parent councils. With regard to building a
shared understanding of how and why children’s additional support needs can be met through Universal
Learning & Teaching alongside a more diverse Curriculum, the involvement of Parent Councils in aspects of
school improvement planning relevant to ASN and Inclusion would help.
2. Alongside this, consideration should be given to training for school staff in order to strengthen their
engagement with parents and parent councils, to support a shared understanding of more inclusive and
responsive practice, which some Head Teachers reported as being a challenge following the recent review
of Support Staff allocations.
3. Argyll and Bute’s Education Service has placed children’s rights and wellbeing at the centre of policy and
planning, including how their voice is gathered and responded to through the Children and Young People’s
Advisory Board. It will be important to ensure that this continues to be integrated with the previous
recommendations as an important source of ASN-related data which informs curriculum planning;
workforce development; Leadership of Change and the effectiveness of partnership working.
4.3  Opportunities for Improvement
1. Redefining Universal Provision should be a central focus for leadership and quality improvement processes
across all school communities. This process should be data-informed and must actively involve partners
as well as parental participation to ensure shared understanding and co-ownership.
2. Should the recommendation for the wider review of support staff (see Section 7) be taken up, monitoring
of the impact on further control of the budget for ASN could allow for redirecting spend between universal
and targeted provision as required. Redesigning the support staff workforce to align with the principle that
staff should be equipped with the skills to meet a diverse range of needs flexibly and sustainably, can also
strengthen the impact they could have across the varied contexts in which children grow and learn.
3. The establishment of Learning Centres as a place-based model of support for children with complex
needs should have a steering group and clear plan for implementation measures involving school leaders
and where possible multi-agency partners. This might then facilitate the plans for a Single Point of Access
so that services for children with ASN are co-located and better able to deliver shared multi agency
universal provision.

Page 23

22     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     23   
4. Existing data related to ASN could be repurposed and expanded to better assess the impact of specific
interventions and approaches on children and young people’s learning and wider development.  
Key evaluative questions might include:
• Which children and cohorts with recorded ASN, supported through universal provision, are reflected in
improved ACEL outcomes?
• To what extent are young people following DYW courses in the senior phase progressing to positive
destinations?
• Are those receiving Assessment Arrangements achieving their predicted grades - or exceeding them?
• What impact are Flexible Learning Plans having on children and young people’s progression and wellbeing?
• How are children and young people receiving targeted support for neurodivergence progressing through
implementation of SCERTS?
• What could complimentary tariff scores in the senior phase explain about the impact which wider
achievement/ accreditation has for young people?
• What developmental milestones are being met by children and young people with complex learning and
care needs?
• What is the impact of targeted ASNA support, as evidenced by resources such as the ‘The Deployment
of Teaching Assistants?’ (Education Endowment Fund, 2024)
5. Professional development for teachers should also include the recent introduction of ASN dashboards
which presents opportunities for Head Teachers to engage more actively in strategic planning and
improvement at the school cluster level.
6. The Parental Involvement and Engagement Strategy should explicitly prioritise Additional Support Needs
and Inclusion. This would promote a shared understanding between Early Learning and Childcare settings,
schools, and parents of how inclusive practices are defined, delivered, and evaluated.
Findings and recommendations for improvement with regard to Partnership working are covered in more detail
in Section 8 as it is relevant to all of the workstreams covered in the Review.
Indicative Implementation Timeline
Implementation of Recommendation 2 will be dependent on the timing of the wider staffing review
recommendation in Section 7. All other recommendations can be incorporated into current improvement
planning for ASN/Inclusion within the Education Service’s Plan for 2026-27.
4.4  Conclusion
Argyll and Bute Council’s Education Service has already identified some necessary steps to ensure that they
continue to fulfil their statutory duties with regard to Additional Support for Learning, while taking account
of their unique demographics and the increased level of children and families who will need some form of
additional support at some time during their education. Most of the opportunities for improvement which
have been recommended could be implemented over a two-year period by leaders at all levels in the system
in order to evaluate how provision for Additional Support Needs enables all pupils to reach their full potential.

Page 24

24     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     25   
Section 5.1
Primary and Secondary Provision:
Secondary Strategic Collaboration
and Pupil Choice
5.1.1  Overview
Argyll and Bute Council currently provides education for secondary age pupils through ten settings of widely
varying sizes and contexts. Secondary schools range from small island settings with fewer than 50 secondary
pupils to large urban schools with over 1,200. This diversity has fostered strong local identities and solutions,
but also significant variation in the breadth of course choice available to pupils, period lengths and structure of
the school day, access to specialist teachers and the use of digital and virtual learning opportunities.
The review team considers that the Authority has a significant strategic opportunity to increase collaboration
and sharing of expertise across secondary schools. Through working towards the establishment of a common
secondary timetable structure and facilitating an Argyll and Bute wide digital offer, this can also prepare for
national developments and the need for efficient staff deployment.
5.1.2  Service Strengths
1. Performance across Argyll and Bute’s secondary schools, the period 2019-2025 was reported in detail to
the Communities Services Committee on 28th August 2025. (Committee Report Pack pages 107-130)
2. The Review Team recognise that there is a clear strategic vision and strong leadership across the service.
3. A robust digital strategy is in place with successful pilots in virtual learning. It is worth noting that where
there has been a shared arrangement in Oban/Tiree, young people at Tiree HS have seen their course
choice expand significantly.
4. Secondary schools have experienced timetablers and there is central support for creative solutions.
5. There are examples of effective collaboration with partners and clusters, e.g. Developing the Young
Workforce (DYW) team, which are expanded on in Section 8.
6. There are elements of strong pupil performance. For A-D grades, the attainment in Argyll and Bute schools in
2025 is above the current National performance in SQA examinations in two of the national measures: National
five and Higher. Pupils have made gains in S3 attainment and there is progress on reducing some equity gaps.
R4 - Through the establishment of a cross-school group of senior Secondary school leaders and
central officers, plan collectively for a reshaping of Secondary Timetabling models with the aim of
increasing choice for learners through full alignment. The recommended option would provide the
greatest opportunity to access a wider range of courses through maximising the use of current
and emerging technology and facilitating partnership arrangements. Planning should also look to
enhance efficiencies in staff deployment and strengthen the Authority overview in preparation for
any national reduction in class contact time.

Page 25

24     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     25   
5.1.3  Service Challenges 
The Review Team recognise the challenges which the Education Service has to address which include:
1. Declining school rolls in most areas.
2. Significant recruitment challenges (leadership, geographical and subject-specific).
3. Persistent attainment gaps in areas of deprivation.
4. Geographical isolation, transport costs, and small school sizes limiting flexibility.
5. A tendency for schools to work autonomously rather than collectively.
6. Limited subject networking across the authority.
7. Current timetable structures which constrain collaborative flexibility and innovation.
8. Current variation in period lengths (45-65 minutes) and day structures creates some inefficiency and
fragmentation.
9. Introducing RCCT without structural reform could lead to potential staffing gaps, higher costs, and reduced
curriculum breadth.
10. Small schools struggle to recruit specialists for only a few hours per week; collaboration would assist with
this challenge.
5.1.4  National Context
National policy developments are reshaping the landscape. As part of Educational Reform, the Curriculum
Improvement Cycle will have lasting effect on delivery within subjects and across the school curriculum.
The Scottish Government has reaffirmed its commitment to reducing class contact time for teachers, with
increased funding allocations from 2025-26. In preparing for RCCT, Local Authorities will be considering the
need for more efficient deployment of staff. Alongside this there is also a growing emphasis on digital delivery,
equity of access and collaborative working. 
Reduced Class Contact Time (RCCT) Background
COSLA Leaders are committed to continue to work with SG to make meaningful progress but are some way
apart on agreed cost and implementation timeframe. This uncertainty provides a window for the Council to
make preparations.
The introduction of RCCT would have major implications for schools in Scotland. National modelling through
COSLA would suggest there is an additional risk of inefficiencies in staff deployment across Secondary Schools
with many current timetable structures. These inefficiencies increasing costs pressures and potentially
impacting negatively on other forms of support for both pupils and teachers. In Argyll and Bute there is an
opportunity for school leaders and officers to alleviate some of this risk by beginning to collectively model
a new timetable structure. A common structure would support a clearer Authority overview of needs and
implications.

Page 26

26     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     27   
5.1.5  Opportunities for Improvement
In considering full alignment and collective contribution to an Argyll and Bute wide offer, options for
implementation could be as follows:
1. Supporting a culture of distributed leadership, collaboration and collective responsibility, establish a cross-
school task group of senior school leaders and central officers to lead all developments including any
consultation process. This group could oversee the planning for all options listed below.
2. Develop a phased plan to create a common timetable structure along with an Argyll and Bute wide digital
offer, with all schools having the opportunity to contribute and benefit. This would enable more equitable
access to a wider curriculum and specialist subjects and support better coordination of digital and virtual
learning opportunities.
Key design elements in planning could include:
• Providing a broad and balanced curriculum pathways for all learners.
• Expansion of Foundation Apprenticeships and senior phase options.
• Expansion and improvement of the curricular offer for S5 and S6 learners across the authority.
• UHI as a strategic partner increasing uptake of networked courses.
• Facilitating offers from other local and national partners.
• Developing skills and competencies in learning virtually as a preparation for next steps in employment,
college or university and for life.
• Ensuring learners studying at this level have a high-quality learning experience.
• Helping to manage staffing resources efficiently and equitably across the authority, to address areas of
teacher shortage, and create capacity for schools to diversify their curricular offer.
• Prioritisation of subjects facing recruitment shortages.
3. Recognising that full alignment would require consultation on changes to the school day and adjustments
to school transport arrangements, commence consultation in line with Council policy early to allow time for
transport and operational planning.
4. Consider creating an Authority staffing toolkit to inform workforce planning, subject-specific recruitment,
and forecasting, which would support more strategic recruitment and deployment of staff, especially
those who are part-time. It should also align workforce planning with pupil choice. The toolkit aligned to a
common timetable structure can give the Authority a clearer view of the implications of introducing RCCT.
5. Staffing considerations could also include:
• Encouraging dual registration in high-demand subject areas.
• Exploring the wider use of primary-registered teachers to support BGE.
• Creating flexible roles that allow teachers to work across more than one school.
6. Pilot more shared senior phase courses and digital delivery models during 2026-27 as transition steps to
increase choice without overextending local staffing capacity.
7. Provide targeted CPD and registration support to staff to increase flexibility and capacity.
8. Monitor equity and attainment impacts to ensure the new model delivers improved outcomes for all learners.

Page 27

26     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     27   
Indicative Implementation Timeline
Acting early can reduce financial risk, improve efficiency, and support the authority to meet government
expectations while safeguarding curriculum quality. A timeline for implementation is suggested as follows:
•  Preparation: Establish task group, agree scope and principles commencing December 2025.
•  Design: Develop model timetable structure; draft consultation proposals | Feb-Jun 2026.
•  Consultation agreement: Consultation in line with Council policy, transport review | June 26-Dec 2026.
(If full alignment model is agreed)
•  Timetabling: Schools plan timetables to the new structure | Jan-April 2027.
•  Implementation: Common timetable structure live across all secondaries | May/June 2027.
•  Review: Evaluate impact on equity, attainment, staffing efficiency | 2028.
5.1.6  Conclusion
The team considers that delivering an Authority wide common structure could deliver considerable benefits.
In the context of the wider Service Review, this recommendation is driven by three imperatives:
•  Collaboration: Unlocking the potential of school leaders and staff to work collectively, share expertise, and
deliver consistently high-quality learning experiences through strengthened leadership development and in
collaboration with UHI, businesses and digital platforms.
•  Equity: Increasing opportunities for all young people to access a broad and balanced curriculum, regardless
of their location or school size by building greater flexibility into delivery models, staffing structures,
including ASN and support staff roles.
•  Affordability: Preparing for the potential national introduction of Reduced Class Contact Time (RCCT),
which will place pressure on staffing and budgets with current structures.
As a forward-looking Council, moving to a shared timetable model could support the Council to protect and
enhance educational outcomes while managing financial and workforce pressures.

Page 28

28     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     29   
Section 5.2
Primary and Secondary Provision:
Leadership Model 
5.2.1  Overview
In 2021 a proposal entitled “Empowering Our Educators” was developed by the education service as a
response to the challenges being faced by the wider service in terms of falling pupil rolls, recruitment and
retention of school leaders, national reform and HT workload set against the backdrop of Argyll and Bute’s
unique geography. It was an attempt to also recognise that there is no one-size fits all leadership model that
would meet the different degrees of challenge and needs experienced in the different communities across the
local authority. Ultimately in 2022, after a period of consultation, based on the feedback received the council
decided not to proceed with this approach.
The challenges that existed in 2022 persist today and as such it is reasonable to give consideration to how
such challenging, wicked issues might be addressed – at least in part i.e. the areas where the local authority
has control. However, the following section is not, in any way, a recommendation to simply resurrect the
previous approach and implement it.
Currently there are a variety of leadership models across the primary school sector in Argyll and Bute that
include:
• Schools where, within a single school, the leadership team comprises of HTs, DHTs and PTs.
• Schools that operate with a shared headteacher model, where the leadership team may also include
DHTs and/or PTs.
• Schools that are described as all-through 2-18 schools, where the leadership team may also include
DHTs and/PTs.
R5 - Plan, develop and implement a model of shared leadership across schools and clusters in
response to the challenges of recruitment, retention and succession planning relating to school
leadership. Such a model should include a different approach to business and finance support
staffing allocation for primary schools; should include all SNCT promoted posts and should take
account of Recommendations 6 and 9.

Page 29

28     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     29   
5.2.2  Service Strengths
Many of the service wide strengths and challenges identified in Recommendation 4, are applicable in the
content of this section. The strengths include:
• Clear strategic vision and strong leadership across the service;
• A comprehensive quality assurance strategy and associated guidance;
• Examples of effective collaboration with partners and clusters, in addition;
• Improving trends in attainment in Literacy and Numeracy ACEL data (as set out in the Service Progress
and Impact Report 2024-2025.
5.2.3  Service Challenges
Service Challenges include:
• Declining school rolls in some areas;
• Significant recruitment and retention challenges, additionally;
• Inconsistencies and limitations in career progression opportunities across Argyll and Bute;
• Inconsistencies in the curricular offer across all schools;
• Some variation in achievement of outcomes for children and young people across Argyll and Bute;
• Workload of staff in promoted posts (as reported in national surveys e.g. AHDS Workload survey report
- AHDS.
It is worth noting that comments in national surveys relating to workload, were echoed by colleagues in all of
the groups who met with members of the review team. People in promoted posts shared that they felt their
time was disproportionately spent dealing with administrative, operational tasks compared to the time spent
focused on improving learning and teaching, and in turn achieving better outcomes for children and young
people. The administration associated with a nursery provision, and other specialist provisions, was also
cited as taking up a significant amount of time. Similarly, the increased number of children and young people
reported to have additional support needs, has further added to concerns about workload.
5.2.4  Strategic Opportunities for Improvement
Success in leadership development can be built on certain key attributes such as:
•  Distributed leadership: Models that have local empowerment, within a framework, at its heart.
•  Professional learning: On-going support (general and bespoke) for aspiring and current leaders that
builds resilience and fosters innovation.
•  Wellbeing: The prioritisation of manageable workloads and career development help to grow and retain
talent.
•  Flexibility: Rural and island communities need models that reflect and are responsive to their geographic
and cultural realities.

Page 30

30     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     31   
The following are options for consideration that will require more detailed planning, costing, consultation
and trialing prior to any changes to the current provision being implemented. It is the considered view of
the review team, that adopting these options will, in time, result in a recalibration of leadership time spent
between strategic and operational matters. This coupled with appropriate professional learning, should lead to
increased levels of satisfaction amongst school leaders and ultimately to improved outcomes for children and
young people.
Distributed Leadership, Flexibility Wellbeing
a. Review the existing models of shared headship and the associated staffing allocations in light of
Recommendation 6. Doing this would bring in the weighting factors for baseline management, additional
management responsibilities (e.g. nursery, pupil support and Gaelic provision) and socio-economic factors.
Flexibility could then be afforded to headteachers to decide what management roles (PT and/or DHT) and
structure they could adopt to serve all of the schools in the shared leadership arrangement dependent on
their management allocations.
b. Review the existing staffing allocations for all through 2-18 schools based on Recommendation 6. Again,
flexibility could then be afforded to headteachers to use the totality of the management time allocations to
determine a model that best supports the context and needs of the school. The creation of more, perhaps
part-time, DHT roles could be one important by-product a revised shared leadership model. The size of
many of the primary schools in Argyll and Bute mitigates against the requirement for such a role. The
potential to have a DHT role as part of a shared leadership model offers improved career progression for
staff in the primary sector.
Professional Learning
There are a number of good leadership professional learning opportunities currently available across the
education service. These include:
• Argyll and Bute Newly Appointed Head Teacher Programme.
• Argyll and Bute Aspiring to Headship Programme.
• Middle Leadership Programme.
Feedback from headteachers who were part of some of the focus groups held with staff was helpful in terms
of offering suggestions for how the professional learning offer could be improved. There were strong views
expressed that there was a need to target building the capacity of PTs and DHTs through a revised middle
leadership programme. This would be something that the review team recommend is taken forward by the
Head of Education – Wellbeing, Achievement and Inclusion.
Specific training and development for those taking up a shared headship role was also identified as requiring
to be more tailored and bespoke. It was felt the distinctive nature of this role was not sufficiently well
reflected in the current professional learning offer. It would be important that any changes to the current
offer for those in or taking up a shared headteacher role are developed based on their feedback and
identified needs.

Page 31

30     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     31   
Wellbeing
In addition to the flexibilities mentioned above for different management structures in different contexts and
settings, there are other changes that could be considered to help manage workload and offer better career
progression.
a.  Recommendation 9 is concerned with a review of staffing models to provide more flexible approaches to
delivery across clusters in ASN, more general pupil support and in FM. The totality of this recommendation
represents a fundamental shift in how such provision is managed and brigaded. If taken forward the net
results would be a streamlined support staffing structure with clear responsibilities and reporting lines;
clarity around service expectations; fewer, broader, more flexible roles which would enhance deployment
flexibility. From this, there should be an impact felt by those in school leadership roles around administrative
activity that would diminish.
b. Recommendation 9 could be extended further by exploring an entirely different model of business,
finance and resources support for primary schools – particularly the smaller schools where the allocation
of clerical/administrative staff will be minimal. A model of a locality or cluster (which need not be a
geographical cluster) should be explored to consider the affordability of having a type of business manager
support function for an agreed number of pupils (rather than an agreed number of schools).
c. A School Business Manager (SBM) plays a pivotal role in the smooth and strategic operation of a school,
allowing headteachers and senior leaders to focus on learning and teaching. The key functions they typically
perform include (this is not exhaustive nor prescriptive):
•  Budget planning and monitoring: Develops and oversees the school’s budget.
•  Procurement and contract management: Manages purchasing, negotiates contracts, and ensures
value for money.
•  Financial reporting: Prepares reports for as required.
•  ICT and infrastructure: Coordinates IT systems and ensures digital resources meet school needs.
•  Staff recruitment and HR administration: Supports recruitment processes, maintains personnel
records, and ensures compliance with employment law.
Having such a role, determined by a specified number of pupils rather a defined locality would significantly
the reduce major contributors to workload (nationally and locally) not directly linked to improving the
quality of learning and teaching, leading to improved outcomes for children and young people. A reduction
in such workload would help improve wellbeing, job satisfaction and would contribute to making a
leadership role a more attractive proposition.
d. Likewise, the implementation of Recommendation 3 (…that a comprehensive review of all support staff roles
is carried out to design a workforce model aligned with the principle that the workforce should be equipped
with the skills to meet a diverse range of needs flexibly and sustainably, across the varied contexts in which
children grow and learn) should help address the impact on workloads that comes with managing and
supporting the rise in number of children and young people with ASN felt by those in leadership positions.

Page 32

32     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     33   
Housing for Key Workers in Argyll and Bute
Whilst this was not in scope for this review, the issue of availability of appropriate, affordable housing for key
workers was raised. The lack of such affordable housing is acting as a deterrent in attracting key workers
(teachers, social workers, health workers etc.) to different parts of Argyll and Bute. This may be something that
the Community Planning Partnership and the Local Employability Partnership continue to look at to see what
actions may be required to be taken to help improve this particular challenge.
Indicative Implementation Timeline
It is recommended that this work should build on the actioning and implementation of Recommendations 6
and 9. As such, the earliest it is suggested that the work starts would be around March 2026. If progressed
at pace, supported by some additional capacity, it may be possible to have any new shared leadership
arrangements in place from August 2027.
5.2.5  Conclusion
If planned and developed with input from all relevant partners, and where costings permit, approaches as
outlined above could have a significant impact on the workload of those in a leadership role in primary schools
across the local authority. Career progression opportunities would be increased and the ability to have more of
a focus on improving the quality of learning and teaching would be enhanced. In summary, such approaches:
• Respect local identity and offer empowerment within an agreed framework.
• Build leadership capacity.
• Support wellbeing and career progression.
• Tailor leadership models to geographic realities.

Page 33

32     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     33   
Section 5.3
Primary and Secondary Provision:
Primary Staffing Standard
5.3.1  Overview
The education service is facing a number of staffing challenges, reflective of the challenges experienced
nationally. However, many of these challenges are magnified by the nature and scale of the geography of the
area and the particular challenges they present. Given all of this a new, more nuanced primary teacher staffing
standard would enable a more equitable approach to be taken to staffing schools.
The current primary staffing standard has not been reviewed in its entirety for some time. Whilst the approach
to the allocation of teachers using the existing standard has been undertaken with rigour in recent years, there
is a need for a fundamental review given the recognised recruitment and retention challenges, the proposed
increase in non-class contact time (NCCT) and the increasing complexity of educational delivery in an
expansive rural, remote area.
Whilst the current standard does include allocations that reflect some management responsibilities, it does not
take account of all additional responsibilities that may now be required across different schools e.g. support
for pupil provisions. The current standard does not include weighting factors that reflect the range and type of
additional support needs recorded across the primary pupil population. Nor does it best reflect the challenges
that the impact of deprivation on the provision of education has in some areas. The application of the national
guidance (Appendix 2.9 - SNCT Handbook) on class sizes is currently not applied to the 30 primary schools
with a roll of less than 25.
R6 - Develop a new Primary Staffing Standard (for teaching staff) designed to ensure equitable and
fair allocation of staffing across all Argyll and Bute primary schools. The Standard should include
weightings for socio-economic factors (e.g. using ACORN Data or CFG registration); for exceptional
ASN and for management time. It should be reviewed every three years. The staffing allocations for
schools should be reviewed annually in line with this Standard latest census figures, future pupil
projections over a three-year period and should reflect the national guidance on class sizes.

Page 34

34     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     35   
5.3.2  Attributes of a Future-fit Model
A new primary staffing standard should be developed in such ways as to reflect the different size and makeup
of schools across Argyll and Bute. It should be based on the following core weightings:
• Number of agreed classes (determined by national guidance)
• NCCT allocations.
• Management allocations (as a baseline for HT, DHT and PT as appropriate)
• Nursery management allocations (where applicable)
• Socio-economic factors allocation (e.g. using ACORN data or CFG registration)
• Additional responsibilities e.g. pupil support provision.
It should be designed to ensure equitable and fair allocation of staffing across all primary schools. The
allocation for social economic factors should be reviewed every three years. The staffing allocations for
schools, based on the new standard, should be reviewed annually in line with the latest census figures and
future roll projections for a three-year period.
5.3.3  Strategic Opportunities for Improvement
There are a number of key considerations that require to be taken into account in the development of a new
primary staffing standard. It is recommended that a Strategic Working Group be established to lead on this
work and that it be chaired by the Head of Education (Performance and Improvement). Core membership
of the group should include, as a minimum, colleagues from HR, finance, the central education service team,
primary HTs (representing different sizes of schools), a DHT and trade union representation.
The areas of key consideration for the Strategic Working Group should include:
1. The composition of the primary promoted structure (HT, DHT and PT allocations and what factors they
will be based on.
2. The number of agreed classes and how the allocation of NCCT and baseline management allocations
relate to this.
3. The criteria for any nursery management allocation.
4. The allocation weightings for socio-economic factors (and how these will be determined e.g. by using
ACORN data or/and clothing and footwear grant (CFG) registration. There will be judgements about
affordability that will require to be reviewed on a three yearly basis.
5. The allocation weightings for additional responsibilities such as pupil support provisions. (NB considerations
from the implications of Recommendations 2 and 9 should be factored into any decisions reached around
this weighting).
6. The allocations for any shared headship models currently operating.
7. The scope for flexibility to adjust management time of any promoted staff in a school. (NB considerations
from the implications of Recommendation 5 should be factored in any decisions reached around this aspect.)
8. The central allocation of probationer teachers on an annual basis.
9. The development of working examples of the application of the standard for different sizes of schools
and contexts.

Page 35

34     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     35   
10. The necessity, or otherwise, to review and exemplify the roles and responsibilities of HTs, DHTs and PTs
in accordance with the SNCT Handbook.
11. The need for a clear, coherent communication strategy to run alongside all stages of this work.
5.3.4  Conclusion
Careful planning will be required by the Service to ensure that the various interdependencies of different
recommendations are taken forward in a systematic, coherent manner. This piece of work should precede
any work that may be undertaken to look at developing any new shared leadership models as outlined in
Recommendation 5 as a revised new primary staffing standard would be the starting point for considering
the approaches taken to developing new leadership models for schools in Argyll and Bute.
A new primary staffing standard as outlined in this section would ensure:
• Fair, equitable and predictable allocations of teachers to schools.
• Teaching allocations are reflective of individual school circumstances factoring in socio-economic factors.
• Baseline management time relates directly to the number of classes, teaching FTE and the size of any
ELC provision.
• Clear NCCT allocations
A new model based in the factors outlined in this section would still afford appropriate and necessary flexibility
to reflect any exceptional circumstances that may arise. At the same time, it would ensure consistency of and
transparency in the approach taken to staff every primary school in Argyll and Bute.

Page 36

36     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     37   
Section 6
Learning Estate
6.1  Overview
Within Argyll and Bute there are 65 Primary schools, one Joint Campus (Primary and Secondary), four 2-18
Campus’, five Secondary schools, one all-through special school, four Standalone Nursery Schools, one hostel
and a number of schoolhouses and other buildings.
Overall, the learning estate is in good condition: one school is rated A and all others B. Suitability is 61% A, 37%
B, and 2% C (Tobermory - two settings in core facts). Six schools have closed since 2015 and two are currently
mothballed.
R7 - Develop the existing Learning Estate Strategy (ideally linked to Council Strategy) as a matter
of urgency. The strategy should set out the current and medium-term challenges. It should
recommend adopting the Northern Alliance Toolkit tailored to meet the needs of Argyll and Bute.
It should also set out an approach for undertaking place-based reviews on a phased basis, and
identify immediate priorities based on clear criteria.
R8 - Commit to developing an integrated Facilities Management Service, set up a Project Board to
design and deliver this and agree a timescale for implementation.

Page 37

36     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     37   
6.1.1  School Rolls and Projections
School roll projections for 2025-26 to 2032/33 are set out below:
Primary 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Bute 335 320 310 309 300 280 266 266
Cowal 726 707 698 688 665 660 643 643
Helensburgh 1,396 1,366 1,349 1,360 1,322 1,303 1,298 1,298
Islay 243 234 218 238 239 232 218 218
Tarbert 129 136 140 130 128 125 121 121
Campbeltown 408 406 409 414 418 422 438 438
Lochgilphead 477 447 431 428 429 426 423 423
Mull 196 198 184 178 169 151 141 141
Oban 1,039 986 966 942 936 922 929 930
Tiree 50 53 57 53 47 47 43 43
4,999 4,853 4,762 4,740 4,653 4,568 4,520 4,521
Secondary 4,543 4,562 4,535 4,481 4,442 4,352 4,283 4,283
Total 9,542 9,415 9,297 9,221 9,095 8,920 8,803 8,804
• 2020/21: 10,170 (Primary 5,614; Secondary 4,531; Special 25)
• 2021/22: 10,068 (Primary 5,508; Secondary 4,532; Special 28)
• 2022/23: 9,995 (Primary 5,384; Secondary 4,575; Special 36)
• 2023/24: 9,915 (Primary 5,267; Secondary 4,603; Special 45)
• 2024/25: 9,802 (Primary 5,133; Secondary 4,624; Special 45)
This is a 3.6% reduction since 2020/21, with a further 7.2% reduction projected by 2029/30. Projections indicate
continued decline across most localities, with several primaries trending to very low rolls.
Several schools are already operating well below capacity; one example is a school with capacity 150 and 10
pupils (7% occupancy).
6.1.2  Learning Estate Strategy
The Council approved a Learning Estate Strategy 2020-2030 in August 2021, aligned to national guidance, and
was instrumental in securing Schools Improvement Fund support. However, it is now out of date and does not
reflect the current situation, not least the demographic, financial and sustainability pressures which need to be
addressed. The strategy should be refreshed and aligned with any Council-wide Estate Strategy.

Page 38

38     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     39   
6.1.3  Ensuring the Estate Is Fit for Purpose
Whilst condition/suitability are currently good, sustaining this will be challenging as rolls, and therefore
resources, decline. The fixed lifecycle nature of estates costs means cost per pupil rises as occupancy falls.
Similar pressures exist across ELC and the wider Council/partner estate.
The Council has pragmatically used mothballing and, in some cases, closures (six since 2015; two mothballed)
and has drawn on the Northern Alliance (NA) toolkit to ensure consistency of process and engagement with
the Schools (Consultation) (Scotland) Act 2010. The NA toolkits were developed by officers across a number of
local authorities (including Argyll and Bute) drawing on best practice across the country. The toolkit provides
a systemic way forward for councils to deal with falling school rolls, and ensure a holistic approach is adopted.
The toolkit sets out arrangements for engagement with appropriate stakeholders and suggests options are
developed and considered in a consistent and considered way.
A Council specific policy, tailored to Argyll and Bute’s geography and community context, would provide clarity
for members, officers and communities. It would also enable a proactive approach to be adopted, not least
locality-based option development (including innovative models which could include input from partners).
6.1.4  Place-Based Reviews
With support from HubCo the council has commenced work on two Place Based Reviews which can be
a helpful catalyst for enhancing local service delivery, meet local challenges and improve best value. This
approach enables the Council, and potentially its Community Planning Partners, working with the wider
community, to reflect on what is working well, where improvements can be made and identifying/assessing
potential options to make better use of the available estate. There is a variety of guidance and support
available including Scottish Futures Trust Place Guide which provides a step-by-step process to improve
decision making. Regardless of methodology adopted, to be successful wide engagement and participation
is essential. Given the challenges facing Argyll & Bute it is recommended a policy is developed with a clear
timetable for phased implementation across the Council. Consideration should be given to undertaking a ‘test
of change’ in one locality possibly one of the areas where work has already commenced.
6.2  Strengths and Challenges of Operational Arrangements
6.2.1  Prioritising Budgets
1. The Council has a good track record of investing in and maintaining the estate. There are also plans for
further investment albeit the largest project is not currently being progressed. However, plans for the
medium term are limited, and there would be merit in developing a longer-term prioritised plan based on
agreed criteria (this could be linked to a placed based review or at least an education estate review). While
it is recognised resources are limited it is good practice to identify priorities. The first step should be to
agree criteria (with a related phased approach to reviewing requirements in each locality). This approach
can be set out within a Learning Estate Strategy. Consideration should also be given to undertaking a review
of school condition, again on a phased basis.
2. The council has also been adept at utilising resources creatively e.g. using DSM resources to improve
schools. This has helped to offset the reduction in core budgets and for Head Teachers to have input to
improvement works.

Page 39

38     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     39   
3. Notwithstanding this, there would be benefit in undertaking a strategic review of operational arrangements
to ensure roles and responsibilities are clear, and there is clarity on available budget for lifecycle
maintenance and improvement.
6.2.2  Facilities Management (FM)
The other key aspect of running an effective service is arrangements for Facilities Management (FM). At
present eight schools have an inclusive FM service provided as part of PPP contracts. This includes cleaning,
janitorial, property maintenance (planned and unplanned). Only improvement requests are paid in addition to
the Unitary Charge. Head Teachers have no day-to-day responsibility for these services, with the expected
standards being set out in the contract.
For other schools, generally for small schools there is a combined Janitor/Cleaner (managed by Education)
while for larger schools there is a Cleaner (provided by Commercial Services) and a Janitor (Education). Head
Teachers are also responsible for ensuring these services are provided to required standard, albeit officers in
central teams can assist HTs where problems are identified.
All Janitors and Janitors/Cleaners report to a HT i.e. there is no cluster/locality management arrangement,
while Cleaners report to an Area Manager within Commercial Services. Resources i.e. cleaning and janitorial
hours are allocated based on a formula albeit this has not been reviewed for some time.
Commercial Services also provides a Catering service to all schools and ELC.
In terms of Property maintenance, this is generally the responsibility of Commercial Services. However,
Secondary School Technicians undertake Portable Appliance Testing and Janitors have some responsibility
for legionella testing. The geography creates a number of challenges, not least for contractors having to incur
significant travel to perform jobs, even relatively straightforward works.
It is suggested the current model is not meeting the needs of schools, or the authority as a whole. As part of a
Staffing workshop (see also Section 7) with Council staff a number of alternatives (which are utilised in other
Councils across the country) were discussed with the aim of improving service delivery and best value. The
options included varying levels of centralisation and empowerment.
6.3  Opportunities for Improvement
1. Consolidating FM in one Service: based on outcomes from workshop and subsequent discussion it is
proposed an integrated FM Service be established with the following features:
• Develop generic posts which better meets the needs of schools and provide flexibility for absence/
vacancies. This could include small maintenance jobs.
• Providing service on locality/cluster basis – this would enable local needs to be considered, make best
use of skills within the team, provide more resilience e.g. in event of sickness and potentially provide
better career opportunities.
• Develop generic posts which better meets the needs of schools and provide flexibility for absence/
vacancies. This could include small maintenance jobs.
• Consider most appropriate arrangements for line management.
• Develop comprehensive Service Level Agreement clearly outlining what schools and centres can expect.

Page 40

40     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     41   
2. More work is required to develop a service designed to meet the needs of Argyll and Bute. Extensive
engagement with all stakeholders will be required (including Trade Unions, school staff, Head Teachers,
Facilities Management staff) and it is recommended a Project Board is set up to develop and implement an
Integrated FM Service (using improvement methodology). This could be a ‘quick win’ for the Council which
could lead to both an improvement in service and reduction in costs. As part of the review no detailed
benchmarking took place nor were metrics considered e.g. cost of cleaning per square metre or per pupil.
This information is available across Scotland and should be incorporated into the remit of the Project Board.
6.4  Conclusion
The school estate is currently in good condition. However, there are already a number of schools operating
well below capacity, a situation which will get worse if no action is taken. Given the demographic and financial
challenges, the council is facing it is recommended a Learning Estate Strategy is developed as a matter
of urgency (ideally linked to Council Strategy). This could be in two phases i.e. the first report could get
agreement in principle for the approach with a follow up report providing the details.
The strategy should set out the current and medium-term challenges and:
• Recommend adopting the NA toolkit customised to meet needs of Argyll and Bute.
• Set out an approach for place-based reviews on a phased based, including how Education services
requirements will be incorporated within wider place-based review work being undertaken by the Council.
• Outline how priority projects will be identified including any immediate priorities.
• Make specific reference to ELC and ASN requirements.
In addition, the Council should commit to developing an integrated FM service, set up a Project Board to design
and deliver this and agree a timescale for implementation.

Page 41

40     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     41   
Section 7
Education-Wide Support Staffing
Synergies: A Strategic Proposal
7.1  Overview
Argyll and Bute’s education service is facing a number of staffing challenges. The current support staffing
model, while historically functional, may no longer be sustainable or fit for purpose given fiscal constraints,
recruitment challenges, and the increasing complexity of educational delivery.
This section seeks to set out a case for a modernised, hybrid support staffing model - one that is agile, locally
responsive, strategically coordinated, and quality-assured at the centre. Such a model can deliver improved
outcomes for schools, reduce operational risk, and empower local leaders while maintaining accountability.
7.2  Service Context and Challenges
A multi-disciplinary workshop involving Education, Finance, HR, and Commercial Services reviewed the current
system and drew on models used elsewhere in Scotland to identify service strengths and challenges.
7.2.1  Existing Support Staffing Arrangements
• Support staff are allocated to schools using long-standing formulae based primarily on school roll and
class numbers.
• Each secondary school receives an Admin and Finance Assistant (AFA), regardless of roll size.
• Support staffing budgets are devolved to schools, but there is little flexibility for creative local solutions - 
particularly in smaller primaries.
• No provision exists for absence cover, creating instability and increasing workload for remaining staff and
Head Teachers.
R9 - Adopt a strategically coordinated, locally empowered hybrid support staffing model for all non
teaching posts across all sectors to ensure holistic strategic oversight.
It is recommended that: the Head of Education Performance and Improvement lead a multi-
disciplinary project team; wide engagement is undertaken with school leaders, staff, trade unions,
and central teams; the Scottish Approach to Service Design methodology is adopted to ensure
collaborative design and implementation.

Page 42

42     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     43   
7.2.2  Structural Challenges and Risks
• Inconsistent recruitment processes leaves posts vacant for extended periods, while decentralised
management leads to fragmented lines of accountability.
• Central teams understand the staffing formulae and vacancies, but no single officer has oversight of the
entire support staffing system.
• The reductions in budget have eroded staffing levels, and roll reductions have forced further contractions.
• Recruitment pressures - especially in small and remote schools - compound these challenges, threatening
service continuity and educational quality.
• Job designs are outdated and there are too many post types.
• Funding uncertainty undermines consistency, particularly in supply cover.
• The current system promotes “more is better” rather than “fit for purpose.”
• Resistance to change persists among some stakeholders.
• Ambiguity exists regarding the extent of empowerment and accountability between schools and central teams.
7.2.3  Attributes of a Future-Fit Model
Participants identified key attributes for a reformed staffing model:
• Agility to meet emerging requirements.
• Empowerment to enable local decision-making.
• Transparency and equity in resource allocation.
• Succession planning opportunities.
• Clear lines of reporting and service expectations.
The consensus was clear that a fully centralised or fully devolved model would not be appropriate. Instead,
a hybrid model - devolving resources within a central framework, potentially organised on a locality/cluster
basis - offers the best route forward.
7.3  Opportunities for Improvement
7.3.1  Integrated Management Structure
1. Co-produce with central leaders and Head Teachers a streamlined support staffing structure with clear
responsibilities and reporting lines.
2. Define service expectations in formal Service Level Agreements (SLAs) between central services and schools.
7.3.2  Modernised Roles and Flexibility
1. Replace the current myriad of fragmented posts with fewer, broader, more flexible roles, improving local
responsiveness and supporting recruitment.
2. Ensure these changes do not reduce total headcount, but rather enhance deployment flexibility.

Page 43

42     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     43   
7.3.3  Strategic Oversight Role
Appoint a single officer with appropriate support to hold a holistic strategic overview of education support
staffing, including oversight of formulae, resourcing, quality assurance, and stakeholder engagement.
7.3.4  Cluster-Based Facilities Management (FM) Services
Develop an integrated FM service encompassing cleaning, janitorial, first-line maintenance, and testing.
Organise on a cluster/locality basis to:
• Improve service responsiveness.
• Create a clearer promotion structure.
• Reduce risk and duplication.
• Generate significant efficiencies.
7.3.5  The Way Forward
The proposed hybrid model offers multiple benefits:
• Local decision-making within a clear framework which empowers school leaders to determine their staffing
requirements within the available resources.
• Reduced operational burden on central teams, allowing them to focus on quality assurance.
• Improved resilience to staff absence.
• Better utilisation of local expertise.
• Clearer career pathways and staff progression opportunities.
To achieve this transformation, it is recommended that:
• The Head of Education: Performance and Improvement lead a multi-disciplinary project team
• Wide engagement is undertaken with school leaders, staff, trade unions, and central teams.
• The Scottish Approach to Service Design methodology is adopted to ensure collaborative design and
implementation.
7.4  Conclusion
This section looks to set out a case for change. Maintaining the current fragmented model risks further
inefficiency, workload pressures, recruitment challenges, and service gaps. By contrast, adopting a strategically
coordinated, locally empowered hybrid staffing model will future-proof the education system, deliver
efficiencies, and enhance support to our schools.

Page 44

44     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     45   
Section 8
Links to Council-Wide Priorities
and Policies: Multi-Agency
Partnerships
8.1  Overview
1. The Children’s Services Partnership in Argyll and Bute has oversight of the Children and Young People’s
Service Plan (2023-2026) which provides a framework for professionals, parents, carers, and volunteers to
work with our children and young people, helping to shape and improve the services they offer.  
The Children and Young People Service Plan 2023-2026
The plan links across several other plans including the Local Outcome Improvement Plan (LOIP). The Joint
Strategic Needs Assessment provides the foundation for this work, underpins the Children and Young
People’s Service Plan and the Corporate Parenting and Child Protection Plans. It is underpinned by Getting
it Right for Every Child (GIRFEC), and extends this by developing a trauma informed workforce, ensuring that
UNCRC (United Nations Convention on the Rights of the Child) and The Promise are embedded in practice.
The key objectives which are of particular relevance to the Education Service Review are:
• Delivering high-quality universal services for everyone.
• Delivering better targeted services for vulnerable children.
• Respecting, protecting, and fulfilling children’s and young people’s rights.
• Supporting family wellbeing.
2. In order for the Review Team to gain a perspective on how multi-agency partnerships in Argyll and Bute
impact on the design and delivery of the Education Service, it was essential to include representatives from
as many partners as possible in the review process. Therefore focus groups, meetings and workshops were
arranged in order to gather views and contributions from representatives of Health, Social Work and Police
services to gain an understanding of which aspects of partnership working are effective (and why) and the
barriers to implementing shared priorities in the Children and Young People’s Service Plan, particularly those
that relate to children and young people with additional support needs.
R10 - In order to address the current and longer-term challenges of making provision for children
and young people who have complex social and emotional needs (which are strongly related to
their family circumstances), commitment from multi-agency partners and shared analysis of data
to inform planning will be required. Governance at Community Planning and Corporate levels could
strengthen multi-agency approaches such as a Single Point of Access for Families and Transition
Planning for children and young people’s additional support needs at key stages (Early Years and
Post-School).

Page 45

44     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     45   
3. Referring to the research related to integrated strategic planning and provision for children with complex
needs in Scotland is fairly limited, although wider UK research has been considered in relation to the factors
that the literature shows can increase the effectiveness of multi-agency working in children’s services and
what that effectiveness can mean in terms of outcomes for children in care and their families.
Some common themes include:
• Shared professional learning and development.
• Effective information sharing and communication.
• Actively encouraging reflective practice on multi-agency working through formalised processes to
support understanding of cross-agency roles, responsibilities and thresholds.
• Where possible, co-location of services.
• Where possible, shared/pooled budget or resources.
• Strategic Leadership and Governance which threads throughout the system of planning and
implementation.
• Children, young people and their families should be at the centre of planning and decision-making.
• The importance of individual staff who know and work closely with children – and can make a positive
difference to the quality of their support.
It is within this wider context that the findings have been identified of what works well and the challenges in
the system for multi-agency partnership working.
8.2  Strengths and Challenges
1. Partnerships between the Education Service and other services for children operate well when either:
driven by national priorities such as The Promise where data sharing is required for strategic planning and
reporting purposes; or when it is from the ground up, driven by local community priorities, e.g. the Planet
Youth survey identifying young people’s needs on a community basis.
2. The Planet Youth survey is now in its third cycle (2021, 2023, 2025), with a fourth cycle planned and funded
for 2027. All secondary schools are participating, and the data is being aligned with Coalitions within
Communities (governed by the ADP Prevention Sub-Group) to address identified themes and needs among
S3 and S4 pupils. A service for young people in the Campbeltown area has been established in response
to what young people said they needed. Similarly, the need to further develop services to support young
people’s sexual health and relationships have been identified through the survey.
3. As referred to in Section 4, educational outcomes for Care Experienced Children and Young People are
improving with effective delivery of The Promise through oversight and coordination by the Virtual Head
Teacher.
4. Strong support from the Educational Psychology Service and the Inclusion & Equalities Team also facilitates
multi-agency priorities, including Addressing Non-Attendance, Additional Support Needs and Early
Years Networks, and the implementation of SCERTS (Social Communication, Emotional Regulation and
Transactional Support).

Page 46

46     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     47   
5. Strong well-embedded partnerships also exist with Developing the Young Workforce (DYW) and Community
Learning which has expanded opportunities and accreditation for wider achievement among senior phase
learners, including those with ASN. This is achieved on a relatively modest budget when compared with
other areas in the ASN budget.
6. Underpinning these areas of work are positive relationships which are reported between partners, with a
shared willingness to collaborate creatively. For example, Education and Health managers are exploring a
Virtual Team model to coordinate the roles of Wellbeing Practitioners and Family Liaison Officers (FLOs),
enhancing support for families - including Young Carers which represents 26% of children and young people
with ASN in Argyll and Bute.
7. These areas of effective partnership working share common features which appear to promote
sustainability and self-improvement, and which could be replicated on a greater scale in other areas, such
as a Single Point of Access for families. They include:
• good alignment of planning processes between services;
• a sense of autonomy and agency between middle leaders that their efforts and practice can make a
difference;
• shared professional learning focused on children and families’ needs;
• data sharing and analysis which take account of longer-term projections of need, such as employability,
and young people’s mental health and wellbeing.
8. However, as referred to in other sections of this report, it is recognised that barriers to implementation
of some shared priorities arise due to the geography of Argyll and Bute, and related staffing and housing
issues. Alongside this the governance and management of Education and other children’s services are
separate, and priorities for service delivery cannot necessarily be aligned in a timeous way to address
increasing demand for children and families’ needs.
9. A shared concern reported across all agencies is the increase in the nature and number of children and
young people’s additional support needs and how this has affected what all stakeholders define and
understand as Universal provision. Continuing to respond to the perceived demand for targeted resources
is not sustainable in current workforce and budget arrangements.
10. As outlined in Section 3 (Early Years) engagement with Partner Providers as well as with Health and other
stakeholders is critical to delivery of the ELC recommendations.
8.3  Opportunities for Improvement
1. Recommendation 2 regarding workforce planning for ASN offers an opportunity to consider how cross-
service roles which are designed to meet children’s health and wellbeing needs could be established on
a pilot basis. This might address some of the recruitment issues facing all services, including Early Years,
as well as provide a more holistic and consistent approach to making provision from a child and family’s
perspective.
2. Recommendation 3 (making more meaningful use of data) is also relevant to the effectiveness of
partnership working, and underpins some of the areas already referred to. A review of how data can be
shared strategically across the Children’s Services Partnership to better inform projections of needs,
workforce planning and the impact of interventions would strengthen capacity for improvement.

Page 47

46     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     47   
3. There is a need for exemplifying how universal support for children and families in their local communities
can be delivered. Based upon the evidence of what already works in Argyll and Bute, as well as taking
account of research findings, a review of partnership working could ensure a more sustainable and holistic
approach to making provision for children and families’ needs. By taking a closer look at the factors which
enable partnerships that are now well-embedded, success criteria could be applied to areas which appear
to be more complex and challenging. Further investment in the Single Point of Access programme is worth
serious consideration.
4. In doing so, this might assist with addressing the pressures on the HSCP regarding children and families
with intensive health and social care needs. The lack of specialist educational and care provision for
children and young people with complex trauma-related needs places strain on budgets and sometimes
necessitates placement outside local communities. Medium- to long-term investment in staff recruitment,
skills development, and place-based support is essential.
5. There is a need for multi-agency cross-service innovation to future-proof professional learning and career
progression for support staff. Strategic planning time (inwards, outwards, forwards) should be prioritised,
and a multi-agency training calendar could foster a shared sense of belonging and competence.
6. There are some concerns about the inefficiencies in the current system for ordering and maintaining
specialist equipment for children’s health and care needs. A joint approach with the Health and Social
Care Partnership to procurement and commissioning of specialist equipment for children with complex
health and care needs would help manage demand and reduce inefficiencies across the authority’s wide
geographic area.
8.4  Conclusion
In order to sustain the delivery of Education Services which require collaboration with Multi-agency Partners
and to address the current and longer term challenges of making provision for children and young people
who have complex social and emotional needs (which are strongly related to their family circumstances),
commitment from multi-agency partners and shared analysis of data to inform planning will be required.
Governance at Community Planning and Corporate levels could strengthen multi-agency approaches such as
a Single Point of Access for Families and Transition Planning for children and young people’s additional support
needs at key stages (Early Years and Post-School).

Page 48

48     |     Connecting for Success - Shaping the Future
Section 9
Summary of Areas for Potential
Efficiencies
In conjunction with the Council’s internal budget process, the team has worked alongside senior Education
officers in identifying a number of options for efficiencies which, if fully implemented, would deliver savings
of up to £1.3 million in 26/27, £2.5 million in 27/28 and £2 million in 28/29, this being a recurring figure. This
important work will now, following due process, be taken forward by the council’s budget working group.
9.1  Potential Efficiencies
Activity/Savings Summary 2026/27
£000
2027/28
£000
2028/29
£000
Early Years - Positive Starts Budget 50 50 50
Primary Education - Closed Schools 700 700 700
Early Years - Remove 2 Early Lead Posts 82 82 82
Lifelong Learning & Support - Remove 0.4fte Teacher Post 18 24 24
Wellbeing, Inclusion and achievement - Remove Principal
Teacher of Wellbeing 46 74 74
Early Years - Removal of Third Sector Grants - 40 40
Education - Removal of MCR Pathways Earmarking
(one off saving) 80 - -
Universal Free School Meal Funding - Efficiencies 250 250 250
Early Years - Removal of Early Years Teaching Posts 108 108 108
Primary and Secondary Education - Maintaining Teacher
Numbers (one off saving) - 500 -
Secondary - Timetabling Efficiencies - 280 280
Early Years - Change to Three Year Old Start Date - 50 50
Early Years - Reconfigure all other Teacher Time in Early Years - 342 342
Total 1,334 2,500 2,000
Details and background will be set within the Council’s budget templates.

Page 49

No embedded text on this page.

Page 50

50     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     51   
Appendix 1
Implementation Timeline
These recommendations are designed for phased delivery over a 2-4 years period. They will be subject to the
Council’s Equality Impact Assessments, with some enabling shorter- to medium-term efficiencies and savings
once lead-in requirements are met.
Careful planning will be required by the Service to ensure that the various interdependencies of different
recommendations are taken forward in a systematic, coherent manner.
Consideration should be given to whether additional capacity can be provided to support the scoping,
engagement, planning and implementation of all 10 Recommendations within the proposed four-year period.
The governance for all of this work will be a matter for the service to determine.
In terms of setting out a possible timeline for implementation the following is suggested:
•  Recommendation 4 should commence from December 2025, with a view to implementation from May 2027.
•  Recommendation 7 should commence from December 2025 and be undertaken as matter of urgency.
•  Recommendations 2, 6, 8 & 9 all concern workforce and the scoping of each could commence from end
January/start February 2026, with a view to implementation from August 2027 in some, if not, all areas.
•  Recommendation 5 should be progressed only when the three recommendations linked to workforce are
ready to be implemented.
•  Recommendations 1 & 10 require to be considered in collaboration with other partners and as such it is
not possible for a suggested timeline for this work. This would be considered under whatever governance
structures will be established to lead, support and direct the services involved.
•  Recommendation 3 can be incorporated into current improvement planning for ASN/Inclusion within
the Education Service’s Plan for 2026-27.

Page 51

50     |     Connecting for Success - Shaping the Future A Review of Education Services in Argyll and Bute     |     51   
Appendix 2
Engagement with Argyll and Bute
Council and Partners
Date Engagement With
15/05/25 Kick off Session – Convenor, Chief Officers and the Education Team
28/05/25 Education Lead Benchmarking Data and Performance – Performance Dashboards
28/05/25 School Services Support Manager – School Estate
30/05/25 Transformation Programme Manager – Transformation
05/06/25 Education Manager Inclusion and Equality – ASN
06/06/25 Principal Educational Psychologist – Education Psychology Services
11/06/25 Head of Commercial Services – Property Discussion
16/06/25 Education Lead Benchmarking Data and Performance – Performance Dashboards (Follow up)
23/06/25 Education Manager Early Years – Early Years Discussion
24/06/25 Education Manager Performance and Improvement – DYW/SDS including transitions
24/06/25 Chief Social Work Officer HSCP – Partnership Working
09/07/25 Admin Officer Staffing – Staffing Meeting
18/07/25 Education Manager Wellbeing Rights and Relationships
21/07/25 Beth Wiseman – Health Discussion
24/07/25 Meeting with Inclusion Manager
08/08/25 School Services Support Manager – Staffing Discussion
13/08/25 Education Heads of Service; Education Managers; Representatives from HR and Finance – Staffing Workshop
13/08/25 Education Managers/Officers and NHS Representatives – ASN Workshop
13/08/25 Education Managers/Officers and NHS Representatives – Early Years Workshop
19/08/25 Virtual Head Teacher – Care Experienced Children and Young People Discussion
21/08/25 Quality Improvement Officers
22/08/25 Early Years Manager and Officer re ASN
27/08/25 Early Years Manager and Officer re ASN
28/08/25 Specialist Provision Network (Principal Teachers and Depute HTs with lead responsibility for ASN/Inclusion)
04/09/25 Social Work Managers and NHS Representatives – Social Work Workshop
08/09/25 Chief Education Officer and Inclusion Management Team re Phase 2 of ASN strategy
19/09/25 Head of Commercial Services and Head of Education Performance and Improvement – Visit to School Estate
in Helensburgh and Lomond
19/09/25 Head of Education Performance and Improvement and Education Manager Early Years – Early Years Discussion

Page 52

52     |     Connecting for Success - Shaping the Future
Oban Visit – 17th & 18th June 2025
Online Meeting with Cluster Head Teachers/Centre Managers
In Person Meeting with Senior Leadership Team in Oban/Tiree
Meeting with middle managers/faculty heads
Meeting with Partners (DYW, Police, Health)
Visit to Willowview Early Years Provision
Visit to Rockfield Learning Centre
Discussion with Pupils (two groups 8-10)
Visits to Localities
Islay Visit
Meeting with Cluster Head Teachers/Centre Managers
Meeting with Islay Shared Heads
Meeting with Chief Social Work Officer HSCP
Meeting with Head Teacher Islay High School