Democracy Spraffa

Document Pack (Bookmarked) HAC Committee 20 08 25

West Dunbartonshire Council · 20 August 2025
Back to Housing & Communities Committee — 20 August 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
Housing and Communities
Committee 
Date:  Wednesday, 20 August 2025
___________________________________________________________________ 
Time:  10:00 
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:  Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk           
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Housing and Communities Committee as detailed
above. 
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton G82 1QL. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT
Chief Executive 
Page 1

Page 2

Distribution:- 
Provost Karen Murray Conaghan
Councillor Kevin Crawford
Councillor Ian Dickson 
Councillor Gurpreet Singh Johal (Chair)
Councillor David McBride
Councillor Michelle McGinty*
Councillor Lawrence O’Neill
Councillor Lauren Oxley 
Councillor Martin Rooney
Councillor William Rooney
Councillor Hazel Sorrell (Vice Chair)
Councillor Sophie Traynor 
*Membership effective from 9 August 2025 
All other Councillors for information 
Chief Executive
Chief Officer – Housing and Employability
Chief Officer – Resources 
Date issued:  7 August 2025 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site. 
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/ 
Page 2

Page 3

HOUSING AND COMMUNITIES COMMITTEE 
WEDNESDAY, 20 AUGUST 2025 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING  
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
4 RECORDING OF VOTES   
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record. 
5 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
6 MINUTES OF PREVIOUS MEETING       7 - 10 
Submit for approval, as a correct record, the Minutes of Meeting of the
Housing and Communities Committee held on 7 May 2025. 
7 SCRUTINY REPORTS 
(a)  POLICE SCRUTINY REPORT                                 To Follow
Submit report by the Divisional Commander, Police Scotland providing
Members with an update Quarter 4 on local policing in West Dunbartonshire. 
7 (b)/
Page 3

Page 4

(b)  FIRE AND RESCUE SCRUTINY REPORT             11 - 26
Submit report by the Local Senior Officer, Scottish Fire and Rescue Service
providing appropriate performance data measured against priorities in the
West Dunbartonshire Local Fire and Rescue Plan. 
8 HOUSING EMERGENCY ACTION PLAN            27 - 57 
Submit report by the Chief Housing Officer providing an updating on the
Housing Emergency Action Plan (HEDAP) which was formulated to address
the emergency following the Council’s housing emergency declaration on 1st
May 2024. 
9 MORE HOMES WEST DUNBARTONSHIRE – WEST            59 - 69 
DUNBARTONSHIRE COUNCIL AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME   
Submit report by the Chief Housing Officer providing an update on progress
with West Dunbartonshire’s More Homes Programme which oversees the
delivery of the Council’s new home building programme. 
10 SCOTTISH SOCIAL HOUSING CHARTER/REGULATION  
OF SOCIAL HOUSING IN SCOTLAND ANNUAL UPDATE 
REPORT
71 - 86 
Submit report by the Chief Housing Officer providing an annual progress
report on meeting the requirements of the Scottish Social Housing Charter
and the Scottish Housing Regulator’s Regulatory Framework for social
housing, including the approval of the Annual Assurance Statement. 
11 HOME AT THE HEART - WEST DUNBARTONSHIRE’S 
RAPID RE-HOUSING TRANSITION PLAN UPDATE AND 
NEW APPROACHES TO HOMELESSNESS PROGRESS
87 - 98 
REPORT 
Submit report by the Chief Housing Officer providing an update on “Home at
the Heart” WDC’s Rapid Re-housing Transition Plan (RRTP) for the period
2019-25 and new approaches to homelessness. 
12/ 
Page 4

Page 5

12 BUILDING SERVICES PROCUREMENT PROVISION 
UPDATE
99 - 115
Submit report by the Chief Officer - Housing and Employability advising of
updated tender requirements information for Building Services and seeking
approval for the award of contracts by the Chief Housing Officer to successful
bidders. 
13 CAPITAL BUDGETARY CONTROL REPORT TO 30   
JUNE 2025 (PERIOD 3)    
117 - 122 
Submit report by the Chief Officer – Resources providing an update on the
HRA capital programme to 30 June 2025 (Period 3). 
14 HOUSING REVENUE ACCOUNT (HRA) BUDGETARY  
CONTROL REPORT TO 30 JUNE 2025 (PERIOD 3)  
123 - 130 
Submit report by the Chief Officer - Resources advising of the 2025/2026 HRA
revenue budget position on 30 June 2025 and the forecast position of the
HRA reserves as of 31 March 2026. 
15 GENERAL FUND HOUSING AND COMMUNITIES   
FINANCIAL REPORT 2025/26 AS AT PERIOD 3 
(30 JUNE 2025)
131 - 138 
Submit report by the Chief Officer - Resources providing an update on the 
financial performance to 30 June 2025 (Period 3) of General Fund 
Revenue services under the remit of the Housing and Communities 
Committee. 
Page 5

Page 6

Page 6

Page 7

HOUSING AND COMMUNITIES COMMITTEE 
At a Hybrid Meeting of the Housing and Communities Committee held in the Civic
Space, 16 Church Street, Dumbarton on Wednesday, 07 May 2025 at 10.00 a.m. 
Present: Provost Karen Murray Conaghan and Councillors Gurpreet
Singh Johal, David McBride, John Millar*, Lawrence O’Neill,
Lauren Oxley, Chris Pollock, Martin Rooney, William Rooney,
and Sophie Traynor. 
*Arrived later in the meeting. 
Attending: Peter Barry - Chief Officer, Housing and Employability; John
Kerr, Housing Development and Homelessness Manager;
Nicola Pettigrew, Housing Operations Manager; Laurence Slavin 
- Chief Officer, Resources; Alistair Norris, Contracts Manager;
Christopher Anderson, Legal Officer; Nicola Moorcroft and Lynn
Straker, Committee Officers. 
Also attending: Divisional Commander Gary I’Anson, Superintendent Patricia
Robertson and Chief Inspector Simon Shanks, Police Scotland;
Area Commander Joe McKay and Watch Commander Tony
McGloin, Argyll and Bute, East and West Dunbartonshire,
Scottish Fire and Rescue Service. 
Apologies: Apologies for absence were intimated on behalf of Councillors
Ian Dickson and Hazel Sorrell. 
Councillor Gurpreet Singh Johal in the Chair 
STATEMENT BY CHAIR – AUDIO STREAMING 
Councillor Gurpreet Singh Johal, Chair, advised that the meeting was being audio
streamed and broadcast live to the internet and would be available for playback. 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in the item of business on the
agenda however, Councillors Johal Singh and Traynor made Transparency
Statements noting a connection to matters discussed at Item under the heading 
‘Housing Emergency Action Plan’, noting that having applied the objective test, it
does not amount to an interest. 
ITEM 6
Page 7

Page 8

RECORDING OF VOTES 
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of the Meeting of the Housing and Communities Committee held on 26
February 2025 were submitted and approved as a correct record. 
SCRUTINY REPORTS 
(a) POLICE SCRUTINY REPORT 
A report was submitted by the Divisional Commander, Police Scotland providing
Members with an update Quarter 4 on local policing in West Dunbartonshire. 
After discussion and having heard Divisional Commander Gary I’Anson,
Superintendent Patricia Robertson and Chief Inspector Simon Shanks, in further
explanation of the report and in answer to Members’ questions, the Committee
agreed to note the update provided. 
Note: Councillor Millar entered the meeting at this point. 
(b) FIRE AND RESCUE SCRUTINY REPORT 
A report was submitted by the Local Senior Officer, Scottish Fire and Rescue
Service providing appropriate performance data for Quarter 4, measured against
priorities in the West Dunbartonshire Local Fire and Rescue Plan. 
After discussion and having heard Area Commander Joe McKay and Watch
Commander Tony McGloin, Argyll and Bute, East and West Dunbartonshire, Scottish
Fire and Rescue Service, in further explanation of the report and in answer to
Members’ questions, the Committee agreed to note the update provided. 
Page 8

Page 9

HOUSING AND EMPLOYABILITY DELIVERY PLAN 2024/25 - YEAR-END
PROGRESS AND HOUSING AND EMPLOYABILITY DELIVERY PLAN 2025/26 
A report was submitted by the Chief Officer - Housing and Employability setting out
the year-end progress of the 2024/25 Delivery Plan and presenting the new Delivery
Plan for 2025/26. 
After discussion and having heard the Chief Officer - Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed to note the progress achieved
at year-end and the new plan for 2025/26. 
HOUSING EMERGENCY ACTION PLAN 
A report was submitted by the Chief Officer - Housing and Employability providing an
update on the Housing Emergency Action Plan (HEDAP) which was formulated to
address the emergency following the Council’s housing emergency declaration on
1st May 2024. 
After discussion and having heard the Chief Officer - Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed: 
(1) to note the progress to date and the implementation of the key actions of the
Housing Emergency Declaration Action Plan as summarised in paragraphs
4.1 - 4.9 of the report and in the action plan update within Appendix 1 of the
report; 
(2) to note the agreed letting target for 2025/26 to households experiencing
homelessness is to be 59% as detailed in paragraphs 4.10 - 4.14 of the
report; and 
(3) to note the Chief Officer - Housing and Employability will continue to bring an
update report to future Housing and Communities Committee meetings
regarding the housing emergency declaration including an updated action
plan as noted in paragraph 4.3 of the report. 
MORE HOMES WEST DUNBARTONSHIRE – WEST DUNBARTONSHIRE
COUNCIL’S AFFORDABLE HOUSING SUPPLY DELIVERY PROGRAMME 
A report was submitted by the Chief Officer - Housing and Employability providing an
update on progress with West Dunbartonshire’s More Homes Programme which
oversees the delivery of the Council’s new home building programme. 
After discussion and having heard the Chief Officer - Housing and Employability and
the Housing Development and Homelessness Manager, in further explanation and in
answer to Members’ questions, the Committee agreed:- 
Page 9

Page 10

(1) to note the content of the report and the progress made to date in the delivery
of the Council’s More Homes West Dunbartonshire approach, including the
final handovers of 88 new Council homes at the zero carbon Clydebank East
development which completes a significant housing led regeneration project; 
(2) to invite the Chief Officer - Housing and Employability to carry out a
procurement exercise and to subsequently award the contract up to budgeted
costs for the new build developments at West Thomson Street, Clydebank
and the next phase at Willox Park, Dumbarton; and 
(3) to note the resource planning allocation of an initial £10.757m to West
Dunbartonshire Council to deliver the Affordable Housing Supply Programme
in 2025/26. 
BUILDING SERVICES PROCUREMENT PROVISION 
A report was submitted by the Chief Officer - Housing and Employability advising of
updated tender requirements information for Building Services. 
After discussion and having heard the Chief Officer - Housing and Employability, the
Chief Officer – Resources, the legal Officer and the Contracts Manager, in further
explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the contents of the report; 
(2) to approve the procurement processes to tender the requirements listed within
the table in paragraph 4.2 of the report; and 
(3) to defer approval to award contracts to successful bidders to the Chief Officer
- Housing and Employability, until clarification has been provided regarding
the legalities of such a delegation of authority. 
The meeting closed at 12.03 p.m.
Page 10

Page 11

Scrutiny Report
2025-26 Q1
West Dunbartonshire Performance and
Scrutiny Group
West Dunbartonshire
ITEM 7b
Page 11

Page 12

202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
About the statistics within this report
The activity totals and other statistics quoted within this report are published in the interests of
transparency and openness. They are provisional in nature and subject to change as a result of ongoing
quality assurance and review. Because all statistics quoted are provisional there may be a difference in
the period totals quoted in our reports after local publication which result from revisions or additions to the
data in our systems. The Scottish Government publishes official statistics each year which allow for
comparisons to be made over longer periods of time.
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 12
Page 13
Page 14
Summary
Trends
Accidental Dwelling Fires (ADFs)
Accidental Dwelling Fire Casualties
Non-Fire Casualties
Deliberate Fires
Non-Domestic Fires
Unwanted Fire Alarm Signals (UFAS)
Road Traffic Collisions (RTCs)
Home Fire Safety Visits (HFSVs)
Fire Safety Enforcement
Community Safety & Engagement
Glossary of Terms
1
2
3
4
5
6
7
8
9
10
11
12
13
Contents
Scrutiny Report
2025-26 Q1
West Dunbartonshire Performance and
Scrutiny Group
West Dunbartonshire
Page 12

Page 13

1. Summary
245
Fires
54 151
False Alarms
450
15 2 0
Fire Fatalities
3 0
46
UFAS
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Non-Fire Incidents
People Rescued by
Firefighters
People Receiving
First Aid or Hospital
Treatment (Non-Fire)
People Receiving
First Aid or Hospital
Treatment (Fires)
Non-Fire Fatalities
Top 10 Incident Types
Fire
(Outdoor)
False Alarm
(Good Intent)
False Alarm
(UFAS)
Fire (Building) False Alarm
(Due to
Apparatus)
Inter-Agency Fire (Vehicle) Humanitarian Animal
Assistance
Vehicle
(Non-fire)
188
60
46 44 41
21
13 10 8 6
2025-26 Q1
Fire Safety AuditsHome Fire Safety Visits
Total Incidents
(Incl. Incompletes)
In this report, the Scottish Fire and Rescue Service(SFRS) has demonstrated a strong commitment to public safety. We 
attended a range of operational incidents, which are detailed above. Home Fire Safety Visits(HFSV) continue to be a 
priority. Details of our new HSFV referral pathway are included in section 12 of the report. 
Fire safety audits and community engagement initiatives remain proactive measures, ensuring  our communities are 
safer places to work, live, and visit. 
The overall trend in this report reflects a steady management of all incidents, with fluctuations reflecting seasonal 
variations. Accidental dwelling fires are well monitored, while the service also continues to focus on reducing deliberate 
fires and non-fire incidents. The data provided highlights a well-coordinated approach to fire prevention and emergency 
response.
Page 13

Page 14

2. Trends
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Accidental Dwelling Fires
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
31
29
34
18 23
33 33
24
26
29
27
25
29
26
29
31
Deliberate Fires
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
111
182
30
178
45
168
70 71
84
65
87
49
73
94 90
56
Non-Domestic Fires
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
6 6
11
3 4
10 9
4
6
8 7
56
5
7
6
Unwanted Fire Alarm Signals
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
144
46
25
136
83 52
119
101
31
51
101
123
34 3542
108
Road Traffic Collisions
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
8
5
11
2
9
4 4 3
8 7
5 6 7
5
5 6
Previous 16 quarters (4 years)
Page 14

Page 15

3. Accidental Dwelling Fires
Extent of Damage Incidents

Not applicable 17
Limited to item 1st ignited 7
Limited to floor of origin (not whole
building)
2
Limited to room of origin 2
Limited to 2 floors (not whole
building)
1
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Source of Ignition (Top 10)
Cooking appliance Electricity supply Other domestic style
appliance
Industrial equipment Smoking Related
19
5
3
1 1
Trend by Quarter (4 years)
15
20
25
30
35
29
Accidental Dwelling Fires
in this period
2025-26 Q1
Incidents by Ward
Clydebank Central
Clydebank Waterfront
Dumbarton
Leven
Kilpatrick
Lomond
10
8
4
4
2
1
SFRS is dedicated to reducing accidental dwelling fires in domestic properties across Scotland. This commitment is evident through 
our proactive measures, community engagement, and continuous improvement strategies. 
SFRS employs a range of proactive measures to prevent fires before they start. One of their key initiatives is the HFSV program, 
where Community Action Teams and Operational Crews visit homes to assess fire risks and provide tailored advice on fire prevention.
These visits often include the installation of smoke alarms and heat detectors to comply with Scottish Government legislation thus
ensuring that homes are equipped to detect fires early. 
Over this quarterly reporting period we see a decrease in accidental dwelling fires across West Dunbartonshire from 31 to 29. 
Page 15

Page 16

4. Accidental Dwelling Fire Casualties
Non-Fatal
Casualties
2
Fatal
Casualties
0
Nature of Injury/Cause of
Death
Casualties

Burns - slight 1
Overcome by gas, smoke or toxic
fumes; asphyxiation
1
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Clydebank Waterfront 2
Trend by Quarter (4 years)
0
5
10
0
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
1 1
First Aid Given
at Scene
Hospital Slight
Injuries
0
Hospital Serious
Injuries
2025-26 Q1
SFRS is committed to reducing accidental dwelling fire casualties across all communities in Scotland. This dedication is
reflected in our comprehensive reduction strategies, community-focused initiatives, and continuous efforts to improve fire
safety.
Through strategic initiatives, community engagement, a data-driven approach, support for vulnerable groups, and 
continuous improvement, we strive to make every home in Scotland safer. Our efforts not only save lives but also foster
a culture of fire safety awareness and prevention within our communities.
Over this reporting period we have seen a decrease in accidental dwelling fire casualties from the previous quarter, from
9 to 2, which we will continue to monitor. There were no fatal dwelling fire casualties over this recording period.
Page 16

Page 17

5. Non-Fire Casualties
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Dumbarton
Clydebank Waterfront
2
1
Trend by Quarter (4 years)
5
10
Non-Fatal
Casualties
3
Fatal
Casualties
0 15
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
0 3
First Aid Given
at Scene
Hospital Slight
Injuries
0
Hospital Serious
Injuries
Nature of Injury/Cause of Death Casualties

Fracture 1
Head injury 1
Unconscious, fitting or unresponsive
(no other evident significant injury)
1
2025-26 Q1
Non- fire casualties encompass all other incidents we attend, including road traffic collisions, water rescues, and other specialist type incidents
that do not involve fire. 
Over this recording period we have seen a decrease from 14 to 3 non-fire casualties, which we will continue to monitor. 
As "Non-Fire Casualties" this number represents casualties from inter-agency incidents, where we attended to assist our emergency service 
partner agencies, such as Police Scotland and Scottish Ambulance Service.
Page 17

Page 18

6. Deliberate Fires
Property Type Incident

Grassland, woodland and crops 93
Refuse 46
Other outdoors (including land) 20
Road Vehicle 7
Dwelling 6
Non Residential 5
Outdoor structures 5
Hour of Day
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Clydebank Waterfront
Leven
Kilpatrick
Clydebank Central
Dumbarton
Lomond
47
37
33
23
23
19
Trend by Quarter (4 years)
0
50
100
150
200
182
Deliberate Fires
in this period
2025-26 Q1
We are committed to reducing deliberate fire setting, recognising the significant dangers it poses to communities and the environment. 
Deliberate fires can endanger lives, cause property damage, and divert valuable resources away from genuine emergencies. We have several
strategies to reduce this type of incident including: 
Community Engagement: We actively engage with communities to raise awareness about the risks and consequences of deliberate fire 
setting. This includes educational programs aimed at children and young people in West Dunbartonshire Schools. For example, our Fire Skills
program, which we relaunched in West Dunbartonshire in this recording period.
Collaboration with Partners: We collaborate with various partners, including Police Scotland, Community Wardens and with local schools.
Reporting and Prevention: We encourage the public to report any suspicious activities or build-up of rubbish that could potentially be set on fire.
We have seen a rise from 71 to 182 deliberate fires (Q4 to Q1). This is in keeping with impact of seasonal move from Winter to Spring.
Page 18

Page 19

7. Non-Domestic Fires
Top 15 Property Types
Property Type Incidents

Education 2
Car Parks 1
Entertainment and culture 1
Hospitals and medical care 1
Offices and call centres 1
(50.0%)(50.0%)
33
Accidental
Deliberate
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Clydebank Waterfront
Leven
Dumbarton
Lomond
2
2
1
1
Extent of Damage
Limited to room of
origin
Not applicable Limited to 2 floors (not
whole building)
Limited to floor of
origin (not whole
building)
2 2
1 1
Trend by Quarter (4 years)
5
10
6
Non-Domestic
Fires in this
period
2025-26 Q1
We are dedicated to reducing non-domestic fires, recognising the significant impact these incidents can have on businesses,
public buildings, and the wider community. Non-domestic fires can lead to substantial economic losses, disrupt services, and
pose serious risks to public safety. 
Our local fire safety enforcement team acts as an enforcing authority for fire safety legislation in non-domestic premises. 
This includes regular inspections and ensuring compliance with fire safety regulations. Our enforcement team is also there to
provide support and education to duty holders, including building owners, managers, and staff, to help them comply with 
current legislation.
Over this recording period we saw a slight increase in Non-Domestic fires from 5 to 6. 
Page 19

Page 20

8. Unwanted Fire Alarm Signals
Top 15 Property Types
Property Type Incidents

Residential Home 18
Hospitals and medical care 8
Sheltered Housing - not self contained 7
Hotel/motel 5
Industrial Manufacturing 2
Boarding House/B&B other 1
Industrial Processing 1
Other holiday residence (cottage, flat,
chalet)
1
Public admin, security and safety 1
Retail 1
Sporting venues 1
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Clydebank Waterfront
Leven
Lomond
Dumbarton
Clydebank Central
Kilpatrick
15
10
9
6
5
1
Trend by Quarter (4 years)
50
100
150
46
Unwanted Fire Alarm
Signals in this period
2025-26 Q1
SFRS introduced a new policy in 2023 aimed at significantly reducing Unwanted Fire Alarm Signals (UFAS). This initiative
is part of our ongoing commitment to enhance community safety and optimise the use of resources.
Unwanted Fire Alarm Signals are false alarms triggered by automatic fire alarm systems. These false alarms can be 
caused by various factors, including cooking fumes, dust, or lack of maintenance. UFAS incidents divert fire crews from 
genuine emergencies, leading to unnecessary costs and potential delays in response to real fires. 
While we have seen a steady reduction since the implementation of our revised policy, in this report we have seen a slight
increase from the previous quarter, from 34 to 46.
Page 20

Page 21

9. Road Traffic Collisions
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Kilpatrick
Clydebank Waterfront
Leven
3
1
1
Trend by Quarter (4 years)
5
10
5
Road Traffic
Collisions in
this period
Non-Fatal
Casualties
0
Fatal
Casualties
0 0
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
0 0
First Aid Given
at Scene
Hospital Slight
Injuries
0
Hospital Serious
Injuries
Property Type Incidents

Car 4
Multiple Vehicles 1
2025-26 Q1
Incident Type Incidents

Vehicle (Non-fire) 5    
The SFRS is committed to reducing the number of Road Traffic Collisions (RTCs) across Scotland. Recognising the 
devastating impact these incidents can have on individuals, families and communities, we have implemented a range of 
strategies and initiatives aimed at prevention and effective response. 
We work closely with Police Scotland and attend the 'L' Division Road Safety Governance group on a quarterly basis. This
meeting allows stakeholders to identify new and existing risks and coordinate road safety strategies across West 
Dunbartonshire. 
We did see a slight decrease in RTCs from previous quarter, from 7 to 5 incidents, which we will continue to monitor. 
Page 21

Page 22

10. Home Fire Safety Visits
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
11. Fire Safety Enforcement
2025-26 Q1
Update as of 2025-26 Q1:
Statistics for Home Fire Safety Visits are not available due to a system change. The Business
Intelligence Team is actively working in collaboration with Digital and Technology Services and the
Community Safety Team to ensure suitable quality for future reporting. We apologise for any
inconvenience this may cause.
Update as of 2025-26 Q1:
Enforcement data is currently not available due to data quality issues. The Business Intelligence
Team is actively working to ensure suitable quality for future reporting. We apologise for any
inconvenience this may cause.
Page 22

Page 23

202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
2025-26 Q1
Emergency Services Day - Balloch 
"The Big Disabilty Event" 
12. Community Safety & Engagement  
Fire Skills Relaunch Event 
We were proud to relaunch our Fire Skills program in May. The course is aimed at young  
people between the ages of 12-18. It includes a range of sessions based on firefighter drills 
and can help to develop key skills such as problem solving, first aid & CPR, team working,  
leadership and communication. Our thanks to the inspirational young people who took part. 
Their enthusiasm, teamwork, and dedication made this course truly special
(Pictured - Area Commander Joe McKay with course members. Also pictured, operational 
crews detailing practical drills during the course) 
CFF Henderson and CSA Reed attended the "Big Disability Event" held in Clydebank to 
provide fire safety advice in the home. The event is focused on providing information and 
access to resources, to those living with disabilities and long-term health conditions 
Summer Safety Messaging 
In preparation for Summer, SFRS, Police Scotland, Loch Lomond & The Trossachs National
Park Authority and West Dunbartonshire Council came together in Balloch to strengthen our
multi-agency efforts and raise awareness of the dangers of wildfires, while promoting 
our Wildfire Strategy. 
Our  Community Action Team engaged in delivering our Summer Safety messaging across 
the area. Pictured here, CSAs Johnstone and Reed provided vital wildfire and water safety 
advice to residents and businesses within the West Dunbartonshire local authority and 
engaged with organisations. 
Our Community Action Team, Dumbarton Green Watch, Dumbarton Youth Volunteer 
Scheme (YVS) and the Heritage Trust, all attended the 999 Emergency Services Day in 
Balloch. Engaging with partners and the community on summer safety, including wildfire and
water safety 
Page 23

Page 24

202531/07/25 © Scottish Fire & Rescue ServiceReport generated on
2025-26 Q1
For further information please contact: 
W.EWDABCommunitySafety@firescotland.gov.uk 
Home Fire Safety Visits 
On February 12th, we launched a new referral process for Home Fire Safety Visits. 
This update aims to better target high risk individuals, streamline referrals with a new 
digital system, and enhance data sharing through a Data Sharing Framework (DSF). 
SFRS is also providing ongoing training and support to partner organisations to ensure
effective use of the new system. 
These changes reflect SFRS's commitment to improving fire safety and reducing fire 
related incidents across Scotland.
Education Engagements 
Over this quarter, our Community Action Team has been actively supporting 
engagements in West Dunbartonshire's primary schools. This has included delivering 
Water Safety Scotland's Workshop, to help keep children safe near bodies of water as we
move through Spring and towards Summer in Q1. 
(Pictured - Community Action Team and Police Scotland at Our Lady and Saint Patrick’s
High School, Dumbarton) 
Page 24

Page 25

13. Glossary of Terms
Term - What it means
ADF
Accidental Dwelling Fire.
HFSV
Home Fire Safety Visit.
PDIR
Post Domestic Incident Response, a term used to indicate actions taken following attendance at a fire or
other incident in the home. PDIRs include amongst things the offer of a free follow up home fire safety
visit.
RTC
Road Traffic Collision.
Special Service
Calls to incidents which are not fires or false alarms such as RTCs, rescues, flooding, incidents involving
hazardous materials or the provision of assistance to other agencies.
UFAS
Unwanted Fire Alarm Signals. When an automatic fire detection and alarm system is activated as a result
of anything other than an actual fire the activation is classed as a false alarm. If an attendance is made to
such an event by the Scottish Fire and Rescue Service, then the event is recorded as an UFAS incident.
UFAS Policy Change
In response to COVID, on the 6th May 2020, the SFRS decided to send 1 pump to UFAS premises that
did not have their own Predetermined attendance (PDA).
As of 1st July 2023, the COVID interim 1 pump response was ended and a new UFAS policy was
implemented.
The new policy is to call challenge all UFAS incidents with the intention of non-attendance. Hospitals, care
homes, and sleeping risk premises are all exempt and receive either 2 pumps or their premise specific
PDA.
202531/07/25 © Scottish Fire & Rescue ServiceReport generated on Page 25

Page 26

Design, figures and charts by the Business Intelligence team.
Page 26

Page 27

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer Housing
Housing and Communities Committee: 20 August 2025
___________________________________________________________________
Subject:     West Dunbartonshire Housing Emergency Declaration Action Plan
1. Purpose
1.1 The purpose of this report is to provide members with an update on the Housing
Emergency Action Plan (HEDAP) which was formulated to address the emergency
following the Council’s housing emergency declaration on 1st May 2024.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the progress to date and the implementation of the key actions of the
Housing Emergency Declaration Action Plan as summarised in section 4.1
– 4.10 of this report and in the action plan update within Appendix 1 of this
report;
(ii) Note the Chief Officer, Housing and Employability will continue to bring an
update report to future Housing and Communities committee meetings.
3. Background
3.1 On 1 May 2024 the Housing and Communities Committee unanimously agreed to
declare a Housing Emergency in West Dunbartonshire Council (WDC). The
reasons behind the motion being raised was due to the extreme pressures facing
housing and homelessness service in WDC.
3.2 This was despite positive achievements of the service to help manage the acute
housing need in West Dunbartonshire including the following:
 262 households prevented from experiencing homelessness,
 Progress in reducing the number of empty homes (council voids); and
 The construction of new council homes at the following development sites
Clydebank East, Mount Pleasant, Pappert and Gilmour Avenue.
3.3 However, housing demand has increased rather than the expected reduction and
therefore the following metrics highlight the pressures on the housing and
homelessness systems within West Dunbartonshire.
 Over five thousand applicants on the Council’s housing waiting lists,
 274 households in temporary accommodation awaiting an offer of
permanent housing, of those eighty-nine households have children.
ITEM 8
Page 27

Page 28

 the anticipation of more than 1100 new homeless assessments to be made
during the 2025/26 reporting period.
3.4 As reported previously, the Council has been unable to fulfil all its statutory duties
under homelessness legislation and has incurred sixty-eight breaches of the
Unsuitable Accommodation Order (UAO) following 274 households being placed
in Bed & Breakfast Accommodation during 2023/24.
3.5 The increased supply of new social homes is the key element to help address the
demand pressures, The funding cut to the wider Affordable Housing Supply
Programme funding of around 24%, significantly contributed to the Housing
Emergency Declaration.
3.6 West Dunbartonshire Council was the fifth local authority to declare a housing
emergency following declarations made in Argyll and Bute, Edinburgh, Glasgow,
and Fife. Since the West Dunbartonshire declaration, a further eight local
authorities have followed suit and made a housing emergency declaration (South
Lanarkshire, West Lothian, Angus, Scottish Borders, Dumfries and Galloway,
Aberdeen, East Renfrewshire and East Lothian). Therefore 13 of 32 Scottish local
authorities have declared housing emergencies.
3.6 Significantly on 15 May 2024, the Scottish Government declared a National
Housing Emergency in the Scottish Parliament. The national action plan is still
pending but the new Cabinet Secretary for Housing has made it a priority
action.  The Scottish Government has focused most of their attention and
financial assistance on five local authorities who have declared housing
emergencies (Glasgow, Edinburgh, South Lanarkshire, Fife and West
Lothian) based on their perception that these areas have more significant
need, however West Dunbartonshire continues to have the most acute levels
of homelessness in Scotland per population.
4. Main Issues
4.1 The action plan has four main themes they are as follows:
Theme 1 - Deliver and maintain More Homes –
West Dunbartonshire approach to the delivery of affordable housing
Theme 2 - Make Best Use of Existing Stock
Theme 3 - Enhancing Housing Access and the prevention
of homelessness, and
Theme 4 - Strengthen the Financial viability and capacity of the
Housing Revenue Account and associated Housing and
Homelessness budgets.
4.2 The Project Board continues to meet monthly since the declaration.  The project
board agreed further progress will be made via existing governance
arrangements and reported to the Housing Emergency Project Board. 
A Housing multi agency Housing Summit was held on 10 February 2025 where
key stakeholders gathered to work on solutions to help end the emergency but
also improve long term housing options within West Dunbartonshire. 80
Page 28

Page 29

Stakeholders attended this successful event.  The project Board have since
then agreed to add a further 7 actions to the plan from suggestions made at the
summit.
4.4 There are now a total of 68 actions within the plan. Of which 33 are now fully
complete with another 18 actions more than half complete.
4.5 A full progress report is attached as Appendix 1 of this report and some
highlights are summarised in the sections below: - 
Deliver and maintain More Homes - West Dunbartonshire approach to the
delivery of affordable housing
4.6 The Housing and Communities Committee Convenor wrote to the Housing
Minister requesting the reinstatement of the funding cut to the Affordable
Housing Supply Programme funding, this has now been reinstated within the
2025/26 budget.  The Council through strong tenant support has continued to
deliver much needed new homes with 133 completed to date this financial year
through the completion of the Clydebank East, Mount Pleasant and Pappert
developments.  The delivery of these new homes is enhanced by The Council’s
buyback scheme addressing housing need in West Dunbartonshire, 10
buybacks in 2025/26 have been completed to date. 
Make Best Use of Existing Stock
4.7 There has been positive progress around void performance within the Council’s
housing stock with voids been reduced to 150 at year end and continuing at
that level.  The new repairs policy is being monitored since its rollout in April
2025.  Progress has been made on the review of supported accommodation.
A refreshed drive with additional actions to further promote to maximise the use
of Homeswapper will help meet housing need.    The new empty homes strategy
has brought 9 homes back into use in the first quarter of 25/26, two of which
have been Council buy back acquisitions.  Our damp and mould sensor project
continues to carry out installations with now over 2000 homes having sensors
installed.  The review of our leases is nearing completion which will ensure our
homes are meeting identified housing need within West Dunbartonshire.
Enhancing Housing Access and the prevention of homelessness
4.8 Continued monitoring of the refreshed approach to assist with preventing
negative housing situations including a refreshed housing pathway for WDC
tenants who flee domestic violence.  Actions in the new Housing Solutions
Strategy are being taken forward.  The transfer led allocations approach for new
builds will continue to be maximised in 2025/26.  There has also been
significant progress made around a public awareness campaign on
homelessness.  The significant introduction of a common application form for
social housing in West Dunbartonshire will be launching by quarter three of
2025/26.
Page 29

Page 30

Strengthen the Financial viability and capacity of the Housing Revenue
Account (HRA) and associated Housing and Homelessness budgets
4.9 Several actions continue to be taken forward through the Housing Emergency
Project Board and the HRA Value for Money group which now meets on a
weekly basis to help strengthen the financial health of the Housing Revenue
Account.  Council Officers are also part of a national conversation with the
Scottish Government, COSLA (Convention of Scottish Local Authorities) and
ALACHO (Association of Chief Housing Officers) to investigate the possibility
of HRA debt relief to enable local authorities to build or acquire more social
rented homes following the publication of the Housing Investment Taskforce
report.   A review of building services has taken place with several actions being
taken into 2025/26 to be fully completed.
4.10 The Housing Emergency Project Board, led by the Chief Officer, Housing have
utilised tools within their scope to help make the improvements since the
declaration of the Housing Emergency.  However, there continues to be
pressures on demand for those with particular housing needs and the supply is
unable to meet that demand.  For further improvements and an end to the
emergency may require changes to strategic priorities and committee decisions
therefore the Board may bring proposals within future Housing and
Communities Committee reports to enable these changes to help meet the
housing needs of the citizens of West Dunbartonshire.  In addition, key
performance indicators are continually monitored by the Housing Emergency
Project Board to help show the progress made through the action plan which
will determine an end to the current emergency declaration.
Lettings target for 2025/26
4.11 As reported at the May Committee it was agreed that 59% of available lets in
2025/26 will be allocated to households experiencing homelessness.  Our
Registered Social Landlords (RSL) partners have been asked the same.  Below
details agreements now in place;
Registered Social Landlord Letting % Agreed
Caledonia and Cordale Housing Association 59%
Clydebank Housing Association 50%
Dalmuir Housing Association 59%
Dunbritton Housing Association 50%
Knowes Housing association 50%
Link Housing Association 59%
Trafalgar Housing Association 60%
Loretto Housing Association 59%
5. People Implications
5.1 Initial analysis of the action plan does not indicate any implications for people.
However, many of the actions involved are additional tasks not within current
remits therefore may lead to additional staffing resources where approval at
futures committees if required would be requested.
6. Financial and Procurement Implications
Page 30

Page 31

6.1 The Housing Emergency Declaration Action Plan (HEDAP) will need to be
considered within the context existing resources available to West
Dunbartonshire Council across both the General Fund and Housing Revenue
Account (HRA). There is currently no additional Grant or Subsidy funding
available to Councils because of declaring a Housing Emergency.
6.2 The Housing Emergency Project Board will consider how existing resources
can be utilised to ensure delivery of the HEDAP. This will include a review of
Core Budgets and any Temporary Funding Sources which may be utilised.
6.3 If supply is not increased and demand reduced it will lead to continued
pressures on temporary accommodation and ultimately Bed & breakfast use
which has financial implications. Any funding reviews and subsequent
implications would be brought to future committees. 
6.4 There are no procurement implications to note.
7. Risk Analysis
7.1 Regular breaches of statutory homelessness duties partly triggered the
declaration of the Housing Emergency, and it is highly probable these will
continue without focussed, cross Council and Partnership action led through
the Housing Emergency Project Board.
7.2 The Council is also likely to experience significant legal, regulatory, and
reputational risk due to shortages of housing supply and related services.
Mitigation of these risks are included within the HEDAP, and these will be
managed through the Housing Emergency Project Board.
8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 An EIA has been carried out and there are no negative equalities impacts due to
this update.  A separate EIA screening will be conducted for any policy changes
because of the implementation of the HEDAP.
10. Consultation
10.1 The draft Housing Emergency Declaration Action Plan (HEDAP) was consulted
with a range of key stakeholders including the West Dunbartonshire Tenants
and Residents Organisation. The implementation of the HEDAP is predicated
on a consultative and collaborative focus and several key stakeholders are
represented on the Housing Emergency Project Board.
11.     Strategic Assessment
Page 31

Page 32

11.1 Having considered the Council's strategic priorities; this report contributes
significantly to all strategic priorities.
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive & Adaptable
Peter Barry
Chief Officer, Housing and Employability
Date: 7th August 2025
___________________________________________________________________
Person/s to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Claire McKay – Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing
and Employability, email: Claire.Mckay@west-
dunbarton.gov.uk                                                                                              
Appendices: 1. Housing Emergency Action Plan, July
Background Papers:   Housing Emergency Declaration, Housing and Communities
Committee, May 2024
Report to Housing and Communities Committee; Housing
Emergency Action Plan 
Wards Affected:             All    
Page 32

Page 33

Appendix 1 - Housing Emergency Declaration action plan
Icon Name
1 - Deliver and maintain More Homes - West Dunbartonshire approach to the delivery of affordable housing.
Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Issue letter to the
housing minister
highlight the Housing
Emergency declaration
and requesting that the
full AHSP is restored.
30-Aug-
2024
Yes
Highlight within SHIP
and Programming
Process the impacts of
cuts to the AHSP
31-Oct-
2024
Yes
Participate in a number
of Member and Officer
groups and influence
agenda to maximise
AHSP budget
settlement
31-Mar-
2025
Yes
Continue to lobby SG
for increase in AHSP
funding in
partnership with
COSLA/SOLACE/ALA
CHO
31-Mar-
2025
While we await the final outturn report
West Dunbartonshire Council has been
allocated around £2m additional funding
through our 2024/25 RPA through the
Affordable Housing Supply Programme in
recognition of our ability to deliver, the
additional funding is from the existing
funding within the wider AHSP.  For
2025/26 we now know our RPA to be
£11.053m.
Review impact of
discussions with
Scottish Government
31-Mar-
2025
Yes
John Kerr
Presentation to West
Dunbartonshire
Strategic Housing
Providers Forum
30-Aug-
2024
Yes
Carry out prioritisation
exercise
21-Oct-
2024
Yes
Refresh Strategic
Housing Investment
Plan to ensure the
delivery of new
homes to meet acute
housing need in
West Dunbartonshire
29-Nov-
2024
Draft SHIP approved
by More Homes Project
31-Oct-
2024
Yes
John Kerr
ITEM 8 - APPENDIX 1
Page 33

Page 34

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Board
Deliver new
Strategic Housing
Investment Plan
31-Oct-
2024
SHIP approved at Housing and
Communities Committee of 20th
November   
Jamie Dockery
Deliver the Council's
approved new build
programme for
24/25 helping meet
the identified
housing need.
01-Mar-
2025
Development delivered. action will be
repeated in new year, report to MHPB
Dawn Conner
SHIP to be prepared
and draft submitted to
the Scottish
Government by
October 31
31-Oct-
2024
Yes
Develop and acquire
More Homes Project
Board approval for
proposal to ensure the
acceleration and
prioritisation of new
home delivery.
31-Dec-
2024
Yes
Examine ways to
accelerate new build
delivery considering
housing emergency
declaration
31-Dec-
2024
While the initial action is complete,
ongoing progress in this will be reported
and monitored within the governance of
the More Homes Board.  There does
continue to be internal challenges in the
delivery of new housing.
Develop revised
Strategic Local
Programme in
partnership with
Scottish Government
31-Dec-
2024
Yes
John Kerr
Scale up and extend
the Buy Back
Scheme to meet the
key housing demand
factors including the
provision of
temporary
accommodation
31-Mar-
2025
The buyback scheme has been scaled up
through £10m of additional funding over
the next 5 years in addition for 2024/25
we have been awarded an additional
£309k in 24/25 to secure buyback
acquisitions that directly take households
out of temporary accommodation, our
stated priority is families with children. 
We have a similar allocation of £296k for
25/26.
31-Mar-
2025
Yes
Laura Hanna
Participate in Housing
Investment task force
25-Sep-
2024
YesExplore innovative
housing investment
30-Sept-
2025
Action on track paper being developed for
the September meeting of the More John Kerr
Page 34

Page 35

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
discussions
Continue to develop
own proposals in
partnership with
external agencies and
potential investors
31-Mar-
2025
Yes
and partnership
models to maximise
housing investment
approaches
Homes Project Board.
Proposal paper to More
Homes Project Board
to define policy
31-Sep-
2025
No
In partnership with
the Scottish
Government review
the planning and
consenting system
considering the
national housing
emergency to
increase the scale
and pace of
development across
all tenures
28-Feb-
2025
Updated to 50% as work is ongoing, a lot
is however out of our local control and
actions will be taken forward as part of
the SG response to the national housing
emergency.
actions from the
meeting - attended by
chief planning officer
28-Feb-
2025
Yes
Michael Mulgrew
Detail development
priorities within SHIP
31-Oct-
2024
YesReview HRA resource
allocation across the
Council to help
facilitate/deliver new
build programme
30-Sept-
2025
More Homes Co=Ordinator currently
being recruited as part of Housing
Development Service Redesign Housing Development
service design to be
completed
31-Sep-
2025
No John Kerr
Approval for Gilmour
Avenue modular
development
25-Sep-
2024
Yes
Develop revised
approach based on
review and share with
development partners
31-Dec-
2024
Yes
Explore an approach
to develop modular
and other forms of
innovative housing
by working in
partnership with
other housing
providers
31-Oct-
2025
This action has been delayed due to the
administration of Connect Modular and
the subsequent delay to the Gilmour
Avenue development.
Review Gilmour
Avenue development
31-Oct-
2025
No
John Kerr
Examine the
capacity of the HRA
to deliver agreed
29-Aug-
2025
The ability of the HRA to deliver all
identified tenant priorities including the
delivery of new housing within the HRA
review for 2024/25 31-Mar-
2025
Yes
Peter Barry
Page 35

Page 36

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
housing
ambitions/tenant
priorities
Capital Investment plan will continue to
be discussed with tenant representatives
primarily within future rent consultations
although not exclusive to these.  We will
ensure housing ambitions and service
spend continues to reflect tenant
priorities.
Participation in Scottish
Government trawl
process
30-Sep-
2024
Yes
Special More Homes
Board scheduled for
November to look at
the opportunities with
other service
departments (now
Housing Summitt).
28-Feb-
2025
Yes
Engage with public
and private sector
landowners to
increase the HRA
landbank and
support development
in line with the
refreshed Strategic
Housing Investment
Plan
31-Oct-
2025
Discussions ongoing with one housing
developer re potential for them to
landbank housing opportunities, model to
be explored further.
Plan agreed at More
Homes Board to inform
delivery plans from
2025/26
31-Oct-
2025
No
John Kerr
Review Affordable
Housing Design
Standard
31-Mar-
2026
Full review to be undertaken in 2025, but
the design standard was examined as part
of the SHIP development process and it
was found not to be limiting in terms of
new build ambitions, many developing
associations citing it as a benefit in the
design process and providing clear
guidance.
John Kerr
Increase provision of
Mid-Market Rent
properties as a
viable housing option
for homeless and
housing applicants
30-Apr-
2026
Proposal is being taken forward following
May 2024 committee approval; however,
we now await clarity in terms of Scottish
Government funding arrangements and
the identification of a suitable site and
associated business plan
John Kerr
Refresh Housing
Needs and Demand
Assessment (HNDA)
within a local WDC
perspective
31-Mar-
2026
Action on track following support at the
Housing Summit in February 2025
John Kerr; Claire McKay
Page 36

Page 37

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Carry out a review of
design standards
(Housing
development and
planning)
31-Mar-
2026
Action commenced looking at the
planning requirements in relation to the
delivery of new homes. Jamie Dockery; Michael
Mulgrew
Icon Name
2 - Make Best Use of Existing Stock
Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Continue to Improve
our approach to
empty council homes
with a strengthened
focus on reducing
void time and letting
longer term empty
homes and negating
any use of
unsuitable
accommodation.
31-Dec-
2024
Although the action has been completed
work continues on the Void Improvement
Action Plan working alongside Housing
Operations to improve performance
across the Council. Building Services
continue to set targets to improve
productivity and reduce the average cost
to bring a property back to the Councils'
relet standard.
At end of quarter 3 to end of December
Building Services had received 665 and
returned 706 ready for let properties. The
average time to bring back to relet
standard in quarter 3 was 13 days (target
12 days) compared with 27 days in
2023/2024 (discounted days). Actual days
in quarter 3 was 55 days compared to 79
days in quarter 2. Up to the 27/01/2025
major and extensive voids have been
reduced by 15. The average cost to bring
a property back to the Councils' relet
standard has reduced in 2024/2025
compared to 2023/2024. Less void
properties have been subcontracted and a
significant reduction in void overtime
costs has been achieved. Costs may
increase in quarter 4 as efforts to achieve
the target of 150 by year end continue.   
Martin Feeney
Consider a fixed 20-Dec- Action on track for completion by target Martin Feeney
Page 37

Page 38

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Implement and
monitor measures to
improve the control
and generation of non-
essential repairs.
30-Aug-
2024
Yes
Based on performance
and progress made on
reducing the number of
empty homes agree to
continue to monitor
and postpone any
decision on a fixed
term moratorium.
27-Sep-
2024
Yes
Continue to implement
improvement actions in
the void management
improvement plan
including increasing
productivity and
reducing the average
cost to bring an empty
home back to the
Councils' relet
standard.
29-Nov-
2024
Yes
term moratorium on
non-essential
housing repairs to
focus activity around
bring empty homes
back into use
2024
date with 3 of the 4 sub actions
completed. Actions in the void
management improvement plan and
building services action plan 2024/2025
are progressing well. Increased
productivity in void operations and
reduction in the average cost to bring a
void back to the Councils' relet standard
are evident and further improvement are
progressing and being monitored. The
reduction in costs is in addition to reduced
costs for decorations which is no longer
routinely completed. Due to increased
void properties year to date compared to
2023/2024 the use of sub-contractors will
increase December - March.
Review evidence to
make final decision on
a 3-month (last
quarter of 2024/2025)
moratorium on non-
essential housing
repairs to focus
resources on the repair
of the Councils'
housing properties.
13-Dec-
2024
Yes
Complete review of
referral/communication
processes between
void team and
Helptomove
30-Sep-
2024
Yes
Engage with Consumer 30-Sep- Yes
Develop a process
including exploring
potential partnering
arrangements to
address lengthy
delays by energy
31-Dec-
2025 Nicola Pettigrew
Page 38

Page 39

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Scotland to discuss
problems encountered
and provide case
studies to support
national focus on
holding energy
companies accountable
to resolve meter issues
more efficiently
2024
Introduce new report
from help the move to
identify move ins with
no end date meter
readings to enable
more accurate billing
information
30-Sep-
2024
Yes
Introduce weekly
monitoring report for
support worker to track
progress of complex
meter issues and
update to teams
30-Sep-
2024
Yes
Review liaison
arrangements with
Helpthemove ensuring
appropriate
representation to input
to operational
challenges
30-Sep-
2024
Yes
Develop escalation
process with
helpthemove on more
problematic meter
problems
31-Oct-
2024
Yes
suppliers in the
reletting process.
Explore other providers
to establish if can
provide additional
support to
helpthemove
arrangements
Yes
Accelerate the 31-Mar- A significant milestone was achieved Karen Rae
Page 39

Page 40

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Seek HACC approval of
new strategy - aim to
bring 25 properties per
year back into use
30-Nov-
2024
Yes
reduction of private
sector empty homes
by delivering a new
Long Term Empty
Homes Strategy
2025
which seen the approval of the new
Empty Homes Strategy by committee on
the 20th of November
Review numbers of
empty homes brough
back into use at end of
current financial year
31-Mar-
2025
Yes
Carry put early
consultation with
tenants to inform
revised Repairs Policy
and ensure tenant
priorities are delivered.
30-Jun-
2024
Yes
HRA Value for Money
Group to develop
revised Repairs Policy
which will meets tenant
priorities and reflects
input from key
stakeholders.
31-Aug-
2024
Yes
Deliver with tenant
representatives a
new repairs policy
30-Nov-
2024
Seek approval for
revised Repairs Policy
from Housing and
Communities
Committee November
2024.
20-Nov-
2024
Yes
Stefan Kristmanns
Ensure new repairs
policy achieves key
objectives
30-Nov-
2024
New repairs policy was approved by the
HACC Committee in November 2024. The
policy will achieve objectives to improve
the reactive repair service, making this
more efficient whilst meeting tenants’
expectations. Work is progressing to get
the new policy live by 1 April 2025.       
Martin Feeney
Review and agree the
new 70% allocation to
transfer applicants for
all new builds
30-Aug-
2024
Yes
new media/drive for 16-Feb- Yes
Review and promote
Allocations Policy
flexibilities and
enhanced Transfer
Incentive Scheme
31-Mar-
2025 Claire McKay
Page 40

Page 41

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
downsizing etc 2025linked to the review
of the Housing
Allocations approach
Review current transfer
incentive scheme
28-Feb-
2025
Yes
Introduce notification
to Repair and
Maintenance Manager
on voids properties due
for return on back of
transfer move in
advance of sign-up
30-Sep-
2024
Yes
Introduce robust pre-
allocation house
assessments process
which embeds ongoing
discussions with
Building Services to
highlight condition of
voids and recharges as
required
30-Sep-
2024
Yes
Introduced homeless
liaison meetings in
advance handover
dates to identify
existing WDC tenants
with open homeless
case
30-Sep-
2024
Yes
Prepare lettings
initiative action plan
30-Sep-
2024
Yes
Identify properties for
each quota and engage
with relevant teams to
finalise
31-Oct-
2024
Yes
Actively introduce a
pre letting process
initially linked to the
transfer led
allocation process for
new build social
housing
31-Aug-
2025
Action on track and final milestone will be
achieved with the target time of August
2025.
Review house
assessment form to
ensure capturing
relevant information
via HO mobile app
31-Aug-
2025
No
Nicola Pettigrew
Project board to agree
options for HACC
31-Mar-
2025
YesDeliver the
recommendations
31-Mar-
2026
Action on track and deliverables
programmed from November 2024 Claire McKay
Page 41

Page 42

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
following all feasibility
studies and financial
reviews
Linked to action
H/RRTP/19-24/064
HACC approval on
options
30-Nov-
2025
Nofrom the Supported
Housing Review
Carry out procurement
exercise to meet new
needs and options
agreed
30-Jan-
2026
No
Establish project plan
and resource
requirement
30-Nov-
2024
Yes
Initial Report findings
to be presented and
recommendations
agreed at Better
Homes Project Board
30-Sep-
2025
No
Stock assessment to
be undertaken against
key technical and
operational indicators
to assess performance
30-Sep-
2025
No
Finding to inform
refreshed Housing
Asset Management
Strategy which will be
presented to August
Housing and
Communities
Committee
30-Sep-
2025
No
Carry out a
comprehensive
assessment of our
housing stock to
ensure it can deliver
the key priorities
within the Local
Housing Strategy
30-Oct-
2025
Action on track and will inform the
development of the refreshed housing
asset management strategy.
Implementation Plan
including the focused
regeneration initiatives
to be led by Housing
Development Co-
ordinator (Better
Homes)
30-Oct-
2025
No
Jackie McRory
Continue to roll out 31-Mar- Environmental sensors now installed at Emily Dorrian
Page 42

Page 43

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
1000 Homes 31-Oct-
2024
Yesour approach to
address
condensation,
dampness and
mould within our
homes through the
use of smart
technology that
strengthens housing
management
2025
over 2000 homes
2000 homes 31-Mar-
2025
Yes
Initial Proposal
developed
18-Oct-
2024
Yes
The initial introduction
of 2 new compliance
roles to be managed
within the housing
service and dedicated
to HRA properties
(phase 1)
28-Feb-
2025
Yes
Implementation of
Phase 1
31-Oct-
2025
No
Deliver new
proactive approach
to ensure our
housing stock
continues to meet all
statutory compliance
requirements
31-Oct-
2025
Delayed in terms of the recruitment
aspect, will progress before the end of
September.
Review of planned
approach with tenant
representatives and
paper to be submitted
to Better Homes Board
in September
regarding a potential
Phase 2 to ensure
compliance
requirements are met
31-Oct-
2025
No
John Kerr
Obtain baseline data to
support VFM in
promoting mutual
exchange options with
applicants
30-Sep-
2024
Yes
Review functionality
and best practice with
HomeSwapper
30-Sep-
2024
Yes
Maximise use of
Home Swapper to
meet rehousing need
of transfer applicants
31-Oct-
2025 Nicola Pettigrew
Page 43

Page 44

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Introduce quarterly
marketing information
via social media,
tenants’ news to
maximise awareness
28-Feb-
2025
Yes
Complete marketing
awareness campaign to
increase use of
homeswapper
31-Mar-
2025
Yes
Add link to online
housing application
form to direct to home
swapper and increase
uptake
30-Apr-
2025
Yes
targeted campaign -
news article
highlighting how easy
text transfer applicants
with no housing need
access Facebook
groups to link with
homeswapper
31-May-
2025
Yes
Identify additional
resource required to
support home swapper
back admin functions
required
31-Oct-
2025
No
Review VFM annual
costing of home
swapper and consider
if in-house platform
could be developed
(similar to rent insights
approach)
31-Oct-
2025
No
Gather all information
on all leases for an
overview
30-Nov-
2024
Yes
Begin
consultation/actions to
31-Sep-
2025
No
Review of all current
lease agreements
within context of
housing emergency
(e.g., Safe as
31-Oct-
2025
Action on track will help ensure best use
of housing stock.
John Kerr
Page 44

Page 45

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
end any leases we no
longer think
appropriate - report to
HIB
Houses scatter flats
and impact on
generating
homelessness) Review all leases and
decide whether best
use of housing stock
31-Sep-
2025
Yes
Deliver housing
Capital Investment
Programme to
ensure all homes
meet the Scottish
Housing Quality
Standard
31-Mar-
2025
Housing Capital Investment projects
competed for 24-25 contributing to
improving SHQS compliance. %
compliance numbers are being collated
for year-end reporting and SHR ARC
Alan Young
Maximise the use of
existing housing
systems to support
effective stock
management
31-Mar-
2026
action being taken forward as part of
IHMS Improvement Plan, IHMS team
working with a nominated Senior Housing
Development Officer to ensure the system
meets wider housing service needs before
involving key managers   
Graham Watters
Explore options for a
common mutual
exchange WDC wide
scheme
31-Mar-
2026
No
Explore options of a
common downsizing
scheme for social
landlords in west
Dunbartonshire
31-Mar-
2026
NoExplore establishing
a common
downsizing WDC
wide scheme and a
mutual exchange
site
31-Mar-
2026
Initial progress has been made through
discussion with RSL representatives.
Explore requirements
of a dedicated resource
to facilitate increased
numbers if downsizers
and mutual exchanges
31-Mar-
2026
No
Claire McKay
Icon Name
3: Enhancing housing access & prevention of homelessness
Page 45

Page 46

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Review current
information on
different platforms
31-Aug-
2025
No
explore option of stock
and turnover tool being
added to the public
31-Oct-
2025
No
Carry out a
communications
audit to ensure
tenants and services
fully informed on
housing availability
in WDC
31-Mar-
2026
Action newly commenced and will be
delivered within timeframe.
create a briefing and
offer to attend services
team meetings to
discuss housing in
WDC
31-Mar-
2026
No
Claire McKay
Develop and
implement transfer
led approach to new
build housing
allocations
31-Aug-
2024
Action has been achieved but will be
monitored and a report will follow initially
to the More Homes Project Board
recommending any refinements following
a review of Clydebank East detailing we
are making allocations based on housing
need and there is visibility that it is
tackling homelessness.
Committee Approval in
place and ensure
ongoing tenant support
30-Aug-
2024
Yes
John Kerr
Set up meeting with all
senior management
from both HSCP and
Housing/Homeless to
take forward
discussions
29-Nov-
2024
Yes
Strengthen strategic
leadership approach
with HSCP regarding
housing emergency
30-Jun-
2025
Follow up actions from
joint meeting
25-Apr-
2025
Yes
Peter Barry; Margaret-
Jane Cardno
set up new meeting of
the housing bill group
now Bill is through
stage 1
30-Oct-
2024
Yes
Discuss options for
task force - link to
timeline for the bill
29-Nov-
2024
Yes
Establish a Task
Force approach to
engage public bodies
to promote
prevention measures
linked to the Housing
(Scotland) Bill
31-Dec-
2025
Task force established and expectation is
Stage 2 of the BILL will make its way
through Parliament in 2025.
Develop West
Dunbartonshire
approach
01-Sep-
2025
No
John Kerr
Develop a new 01-Apr- Claire McKay
Page 46

Page 47

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Finalise draft of
strategy following
consultation (Aug until
Dec)
31-Dec-
2024
Yes
Seek HACC approval of
new strategy
28-Feb-
2025
Yes
refreshed strategic
approach to the
prevention of
homelessness
through the delivery
of a Housing
Solutions Strategy
2025
Embed and deliver new
strategy
01-Apr-
2025
Yes
VAWG partnership
supportive of action
H/HEDAP/2024/038
but will be carrying out
a self-assessment of
the group where
Prevention will be a
key element
30-Nov-
2024
Yes
In partnership with
Violence Against
Women Partnership
deliver a refreshed
focus on preventing
negative housing
situations as a result
of domestic abuse.
31-Dec-
2024
deliver action
H/HEDAP/2024/038
31-Dec-
2024
Yes
Claire McKay
Job evaluation 01-Aug-
2025
No
Direct Matches &
Matching Pools and
Expressions of Interest
29-Aug-
2025
No
Full implement the
introduction of the
Housing Solutions
Service following on
from the
Homelessness
Service redesign
31-Dec-
2025
The implementation of the new service
delivery model has been amened due to
the job evaluation timescales.
Service Rebranding
Action List
31-Dec-
2025
No
Joanne Sutherland
Agree in principle
online form and tweak
to ensure all aspects
covered
30-Sep-
2024
Yes
RSL to seek Committee
approval on form
before being finalised
30-Nov-
2024
Yes
Agree data sharing
agreement and
Information to be used
on the website for all
involved and link
13-Jun-
2025
Yes
In partnership with
local RSLs develop
and implement a
common application
form for all social
housing providers in
West Dunbartonshire
as part of the
development of a
Common Housing
Register
17-Oct-
2025 Claire McKay
Page 47

Page 48

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Agree Launch online
form
01-Oct-
2025
No
this is linked to Action
48 being achieved first
31-Oct-
2024
Yes
Delivery of stock sheet
training and Team
Leader
Support/shadowing in
interviews.
28-Feb-
2025
Yes
Development and trial
of Housing Solutions
paperwork and
personal housing plan.
28-Feb-
2025
Yes
Review process once
new structure in place
30-Sep-
2025
No
Completion to module
6 housing options
toolkit for all casework
staff
30-Sep-
2025
Yes
Introduce a
comprehensive
housing options
interviews at
application stage to
manage demand and
options
31 Dec-
2025
Will be delivered within the new service
redesign within the Housing Solutions
service
Housing Options
Survey and
presentation to all
casework staff
30-Sep-
2025
Yes
Joanne Sutherland
Decision paper for
Housing Improvement
Board to agree the
extent of the review
31-Aug-
2024
Yes
meeting of Co-
ordinators to agree the
remit
30-Sep-
2024
Yes
new paper to HIB
agreeing new
proposals of the remit
31-Dec-
2024
Yes
update guidance and
relevant policies on
agreed remit
31-Dec-
2024
Yes
Review remit of
Housing Allocations
Panel to reflect a
homelessness
prevention
perspective
(domestic, at risk,
others that would
otherwise present)
31-Jan-
2025
communicate and 31-Jan- Yes
Claire McKay
Page 48

Page 49

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
update new remit to all
staff
2025
Review current open
Homeless cases with
children
06-Dec-
2024
Yes
Joint meeting between
Homelessness and
Housing operations
focusing cases who do
not have an offer
20-Dec-
2024
Yes
following on identify
any new processes to
be implemented and
rolled out to help
continually reduce
times children spend in
temporary
accommodation
31-Jan-
2025
Yes
Using additional
Temporary
accommodation funds
to focus on acquisitions
for those households in
temp with children
waiting on offers
06-Apr-
2025
Yes
Deliver a refreshed
process which will
ensure that time in
minimised for
children in all forms
of temporary
accommodation
31-Aug-
2025
ongoing monthly
monitoring of numbers
to review and
maximise offers
31-Augl-
2025
Yes
Claire McKay
Carry out recent
research around
stigma and homeless
with view to creating
further actions to take
forward
20-Dec-
2024
Yes
Liaise with WDC
comms team on
appropriate campaign
actions
31-Jan-
2025
Yes
Design and deliver a
dynamic public
awareness campaign
focused on the
realities of
homelessness and
housing need
31-Aug-
2025
Donna Kirkwood; Mayra
Nunes
Page 49

Page 50

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Review WDC homeless
webpage content to
ensure appropriate
language/images used
around homelessness.
03-Feb-
2025
Yes
Identify positive case
studies detailing
household
circumstances and
support provided by
WDC to resolve
homelessness to
highlight help available
and realities of
homelessness.
31-Jul-
2025
Yes
Prepare article for
Housing News, include
positive case study and
advice around
homelessness
31-Aug-
2025
Yes
Review of Pathway 1
cases (i.e., those
homeless but not in
temporary
accommodation)
over 6 months to
assess if in stable
accommodation (and
close if this is
confirmed)
30-Apr-
2025
295 homeless
applications where
temporary
accommodation wasn’t
required, 198 cases
closed when applicants
given a housing
outcome. 86 cases
closed no housing
outcome. Most
common; asked to
leave, fleeing domestic
violence and
relationship
breakdowns.
Yes
Joanne Sutherland
Linked to action 48
being achieved first
31-Oct-
2024
YesIntroduce a
consistent
assessment of
housing and support
needs regardless of
01-Sep-
2025 review support process
once new housing
04-Aug-
2025
No
Claire McKay; Joanne
Sutherland
Page 50

Page 51

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
if a tenant or
presenting as
homeless
solutions services are
rolled out
Recruitment of new co-
ordinator required to
take forward
31-Dec-
2025
No
Develop and
implement a new
approach to
resettlement and
humanitarian
schemes
31-Mar-
2026
Recruitment of new post is scheduled to
commence in August 2025
once restructure and
recruitment in place
new co-ordinator to
review current
approach
31-Mar-
2026
No Claire McKay
Minimise and
eradicate the use of
unsuitable
accommodation for
homeless households
31-Mar-
2025
Continue with monthly
analysis of placements
in unsuitable
accommodation and
breaches of UAO.
31-Mar-
2025
Yes
Joanne Sutherland
Objective 1 - whole
system approach
27-Apr-
2025
Yes
Objective 2 - rapid
rehousing (16 weeks)
27-Apr-
2025
Yes
Objective 3 - interim
housing options
27-Apr-
2025
Yes
Deliver the outcomes
of the Rapid
Rehousing Transition
Plan
30-Apr-
2025
Objective 4 - housing
first
27-Apr-
2025
Yes
Claire McKay
Linked to action =one
Door being achieved
first
31-Oct-
2025
Yes
Explore expanding a
homelessness
prevention approach
and better managed
demand for
temporary
accommodation
31-Mar-
2026
Analysis has been carried out, the
changes indicate prevention work has
been successful, where previous cases
who did not require temporary
accommodation are receiving successful
outcomes without the need to make a
homeless application which has meant
those who have been presenting as
homeless have also required temporary
accommodation rather than being able to
stay with friends or have a temporary
option available. Prevention workshops
will be held in the Autumn which will
complete this action.
review in line with
decrease of pathway 1
and increased need to
for temp
13-Mar-
2026
No
Joanne Sutherland
Introduce a 30-Nov- Joanne Sutherland
Page 51

Page 52

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Action 48 needs
achieved first
31-Oct-
2024
Yes"Mediation First"
approach to housing
applications for
16–19-year-olds (as
a homelessness
prevention
approach)
2025
Restructure - once in
place and introduction
of youth specialist
team put process in
place
30-Nov-
2025
No
actions 37, 42, 46 and
47 can then follow on
from this action if
achieved
31-Oct-
2024
Yes
Paper on the possible
vision to be taken to
Access to Housing
Group in Sep 2025)
30-Sep-
2025
No
Agree principles
relating to new one
door housing access
system aligned to the
new Housing Solutions
service
30-Sep-
2025
No
Implement a ‘One
Door’ preventative
housing access
system under one
service to prepare
for new prevention
duties.
31-Dec-
2025
Proposal being developed and will be
introduced for discussion at the next
Access to Housing Board (September)
Develop
implementation plan
31-Oct-
2025
No
John Kerr
review current
provision
31-Mar-
2025
Yes
Upscale the Housing
First programme
through collaborative
commissioning
30-Sep-
2025
linked to wider discussions with HSCP
Take forward actions
agreed following HSCP
meeting
30-Sep-
2025
No Claire McKay
Deliver and
implement in
partnership with RSL
a Common Housing
Register for West
Dunbartonshire
31-Mar-
2026
The launch of the Common application
form in October 2025 signifies the
beginning of the development of an
operating CHR in West Dunbartonshire. Claire McKay
Review current
information available
to the public
31-Aug-
2025
No
create a project plan 01-Sep- No
Carry out
communication audit
to help manage
current and future
01-Apr-
2026
Action newly commenced and will deliver
within timeframe. Donna Kirkwood; Claire
McKay
Page 52

Page 53

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
following the review of
information on our
webpages
2025
tenants’ and
partners
expectations better
on housing
availability
Make contact with
other partners to
provide better
understood housing
information
31-Dec-
2025
No
Include exploring
use of supported
lodging whilst
reviewing different
temporary
accommodation for
young people
01-Apr-
2026
Action commenced following introduction
at Housing Summit in February 2025
Contact other LAs with
supported lodgings
01-Oct-
2025
No
Claire McKay; Mayra
Nunes
Carry out modelling
reviewing backlog,
expected demand and
turnover with a view to
reducing current letting
ask
30-Apr-
2025
Yes
Review housing
allocation % to
households who
experience
homelessness
01-May-
2025
Seek HIB approval and
ask RSL to match
01-May-
2025
Yes
Claire McKay
Icon Name
4: Strengthen the Financial viability and capacity of the Housing Revenue Account and associated Housing and Homelessness budgets
Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Building services action
plan created
31-Oct-
2024
YesComplete the review
of Building Services
Repairs and
Maintenance service
costs to deliver
immediate
efficiencies to the
HRA
31-Mar-
2025
Building Services - Service Costs
Recovery and Management of the HRA
Maintenance and Repairs Budgets
2024/2025 is progressing well with all
high priority actions 90% or more
complete at 23/01/2025. These action
include improving service efficiency,
effective financial management and
improve people management practice
Deliver action plan -
include service
efficacies
31-Mar-
2025
Yes
Martin Feeney
Page 53

Page 54

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
within the service. 
Explore innovative
housing investment
and partnership
models to maximise
housing investment
approaches
30-Nov-
2025
Action on track but completion date
pushed back to November.  Good
progress made through the More Homes
Board and the establishment of an LLP John Kerr
Agreement made in
24/25
CFO agreed to full
whole system review of
HRA payments that will
begin once Year end
work completed in
2025.
31-Mar-
2025
Yes
Carry out review of
HRA contributions to
other non-housing
Council service areas
31-Mar-
2026
take forward actions
following whole system
review of all HRA
payments by Chief
Finance Officer
31-Mar-
2026
No
Peter Barry
Examine the
capacity of the HRA
and the Council's
General Fund to
deliver agreed
housing ambitions
30-Jun-
2025
further review this
action has been closed
as linked to action 53
31-Mar-
2025
Yes
Peter Barry; Laurence Slavin
Develop a 3-year
rental strategy in
partnership with
tenants to ensure
tenant priorities and
strategic housing
ambitions can be
delivered
30-Nov-
2026
Discussions around the viability of a 3-
year rental strategy from the period
2026-29 will be taken forward via the
HRA Value for Money Group. 
work has begun via
HRA value for money
subgroup - paper will
be taken to the Aug 25
HACC for agreement
30-Aug-
2025
No
Stefan Kristmanns
several actions part of
the review already
taken place saving
money
31-Mar-
2025
YesReview Building
Services structures
and external
contractors to
31-Dec-
2025
Significant work completed to review BS
structures and external contracts to
reduce cost and improve efficiency Peter Barry
Page 54

Page 55

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
Review Building
Services structures
and external
contractors to
ensure best value
Significant work completed to review BS
structures and external contracts to
reduce cost and improve efficiency
Last actions as part of
the review to be taken
forward
30-Nov-
2025
No
Working with other
local authority
partner re-examine
housing finance
position in Scotland
to promote the
delivery of new
social housing
including the
treatment of historic
HRA Capital Debt
31-Mar-
2025
Council Officers participated in the
Housing Investment Taskforce through
ALACHO.
Joint work with COSLA 01-Mar-
2025
Yes
Claire McKay
Review
homelessness
services funding with
aim of being able to
reduce level of
temporary
accommodation and
free up staff
resource
31-Mar-
2026
Ongoing action and alignment with the
Housing Solutions service redesign
John Kerr
Develop a refreshed
funding delivery
model for the
delivery of new
housing in light of
increased borrowing
levels exploring
increased grant
benchmark levels
09-May-
2025
Work ongoing in terms of this action to
ensure we can continue to deliver the
required new housing at sustainable scale
take paper to more
homes board for
approval on the
viability of new agreed
benchmarking (£120K)
30-Apr-
2025
Yes
John Kerr
Directly lobby the
Scottish Government
to ensure the cost of
achieving net zero in
social housing is met
with national funding
to ensure rental
30-Apr-
2025
Link in via SIG this has
fed into both COSLA
and ALACHO being
clear tenants should
pay, and all measures
should be fully funded
by Scottish
30-Apr-
2025
Yes
Claire McKay
Page 55

Page 56

Action Status Progress Due Date Comment Milestone Due
Date Done Assigned To
income can be
utilised for improving
current and
developing new
social housing.
government - awaiting
SG publication
Action Status
Cancelled
Overdue; Neglected
Unassigned; Check Progress
Not Started; In Progress; Assigned
Completed
PI Status
Alert
Warning
OK
Unknown
Data Only
Long Term Trends
Improving
No Change
Getting Worse
Short Term Trends
Improving
No Change
Getting Worse
Risk Status
Alert
High Risk
Warning
Page 56

Page 57

OK
Unknown
Page 57

Page 58

Page 58

Page 59

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 20 August 2025
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme
1. Purpose
1.1      This purpose of this report is to update the Housing and Communities
Committee on progress with West Dunbartonshire’s More Homes Programme
which oversees the delivery of the Council’s new home building programme.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach,
including the final handovers of new homes at the zero carbon Pappert
and Mount Pleasant developments which completes two significant
housing-led regeneration projects; and 
(ii) Approve a temporary suspension of letting activity at Young Street
sheltered housing complex until the consultation exercise is completed
regarding future housing provision at Young Street/West Thomson Street
and 
(iii) Approves the Chief Officer, Housing and Employability, to direct award a
design and build contract to deliver the Silverton regeneration project up to
the budgeted costs for project (Dumbuie Avenue and Smollett Road)
3. Background
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which has successfully delivered over one thousand new affordable homes in
West Dunbartonshire to date and includes the Council’s own ambitious New
House Building Programme.
3.2 The Strategic Housing Investment Plan (SHIP) 2025-2030, outlining West   
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach was approved by the Housing and
Communities Committee in November 2024. The SHIP outline plans to
ITEM 9
Page 59

Page 60

contribute to meet the Council Administration’s aim of delivering 2500 new
affordable and social rented homes over the 10-year period 2022-2032.
4. Main Issues
More Homes West Dunbartonshire - Delivery Programme
4.1 Building new affordable homes has the key role to play in the Housing
Emergency, revitalising local economies and assisting with post-pandemic
and economic recovery plans, negating the impacts of the current cost of
living crisis and combatting poverty principally child and fuel poverty.  It is also
clear that the need for affordable homes has and will increase in the current
ongoing economic environment.
4.2 The Council’s More Homes West Dunbartonshire approach is an ambitious
plan that aims to continue the positive momentum of the delivery of much
needed Council homes in West Dunbartonshire and will significantly assist the
Council’s aim to deliver 2500 new social and affordable homes by 2032.
4.3 As the largest affordable housing developer in West Dunbartonshire, the
Council has identified several future development sites for new council homes
to address existing and new housing need. The design of these homes will
further develop, improve, and exceed current best practice, providing
sustainable homes using innovative technology and delivering on our low
carbon ambitions including Passivhaus and other net zero carbon
opportunities.
4.4 The Council’s More Homes West Dunbartonshire approach has evidenced
strong support from council tenants and was recently highlighted as one of the
two key future spending priority areas for tenants through the comprehensive
tenant satisfaction survey undertaken in late 2024. 
4.5 The Strategic Housing Investment Plan and HRA Capital Plan outlined the
plans the Council have for meeting their new build ambitions.  An update on
each development site is provide below: -
Pappert, Bonhill
This development has now completed and has delivered 26 net zero homes
for affordable social rent in the Bonhill area -
House Type Sustainability Standard Number of New
Homes
House 3bed/5 person Passivhaus 6
House 3bed/5 person Net Zero 6
House 4bed/6person Net Zero 4
House 4bed/7person Net Zero 1
Flat 2bed/3person w/c Net Zero 3
Flat 1 bed/2person Net Zero 6
Page 60

Page 61

The practical completion date was 6 June 2025.
Mount Pleasant, Old Kilpatrick
The 19-unit development, which is designed for elderly residents and delivers
high quality amenity housing, was completed over 2 weeks early on 8 May
2025. The housing mix is outlined below for information:
Willox Park, Doveholm, Dumbarton
The development of 17 new homes for the elderly at a former care home site
will comprise of the housing mix below.
House Type Sustainability Standard Number of New
Homes
Flat 2bed/3person Net Zero 2
Flat 1 bed/2person Net Zero 15
McTaggart construction are on week 30/52 build programme to deliver 17 new
sheltered housing units. This will be our first project using a ground source
heat network to deliver heat and hot water.
Current tenants at Willox Park have been consulted throughout the design
process and this has continued with the contractor holding Q&A sessions. 
We are currently working with the existing tenants to ensure they have an up-
to-date housing application live to make sure the process of moving into the
new facility is as easy and streamlined as possible.
The move to the new facility is planned for November 2025.
Bonhill Gap Site Strategy
The 28 units of housing at Braehead (17) and Campbell Street (11) will be on
site as of 4 August 2025.
The new tender for the O’Hare project (6 units) is currently being drafted, this
is a result of undertaking an analysis of the energy specification and the
decision of the More Homes Board to retender with a new specification.  The
housing mix of the full Bonhill Gap Site development programme is
highlighted below: -
House Size Sustainability Standard Number of New
Homes
House Type Sustainability Standard Number of New
Homes
Bungalow 1bed/2person Net Zero 3
Flat 1bed/2person w/c Net Zero 4
Flat 1bed/2person Net Zero 4
Flat 2bed/4person Net Zero 8
Page 61

Page 62

1bed wheelchair Net Zero 4
1 bed general needs Net Zero 16
2 bed wheelchair Net Zero 3
3 bed general needs Net Zero 3
4 bed general needs Net Zero 2
5 bed general needs Net Zero 4
7 bed general needs Net Zero 2
Bank Street, Alexandria
The development will consist of twenty-two sheltered/amenity housing units in
partnership with the HSCP. Planning has been submitted and approved.
House Type Sustainability Standard Number of New
Homes
Flat 1bed/2person w/c Net Zero 22
Communal Room Net Zero 1
Staff Office Net Zero 1
The contract for this project has been awarded to the JR Group. This tender
return has returned a competitive price of £5.375m against an estimated cost
of £7.79million.
Similar to the development at Willox Park, tenants at Gray Street have been
consulted throughout the design process and will be assisted to make the
transition as smooth as possible.
West Thomson Street (former Clydebank Health Centre)
Demolition of the former Clydebank Health Centre building was completed in
late 2024.
The development will complete 42 units of housing in total - 15 units of family
housing and 27, fully accessible, sheltered/amenity housing units. The
housing mix can be seen below: -
House Type Bed Number WCH
Sheltered/Amenity
Flat
1 27 27
Cottage Flat 1 2 2
Duplex Cottage Flat 3 2
House 5 2
House 4 5
House 3 4
Total 42 27
The pre-planning application process is on-going with a planning submission
planned for the end of August 2025. We are seeking to tender for a contractor
Page 62

Page 63

through the SPA H2 Framework (Workstream 2). We are seeking approval
from the committee to temporarily suspend lettings within the Young Street
sheltered housing complex as we complete a consultative exercise which
could see the sheltered/amenity new housing provision as replacement
housing for the existing Young Street tenants.
This would follow the previous decision to upgrade the sheltered housing
complexes in Alexandria (Bank Street) and Dumbarton (Willox Park). The
demolition of the former Clydebank Health Centre offers the opportunity to
develop improved housing suitable to the current and future housing needs of
the residential demographic.
The current Young Street complex does not meet contemporary inclusive
living, ageing in place or housing for varying needs standards. For example,
there is no lift access, many flats are not suitable for needs associated with
ageing and require OT input, and there is a lack of dementia friendly design
both internally and externally, the flat layouts are not all wheelchair compliant,
there is a lack of facilities including communal indoor and outdoor space, the
location is isolated and there is no parking provision.
With an ageing demographic (1 in 5 over 65; 90,000 with dementia) and with
the number of years without a disabling condition declining, housing has to
prepare for the future demographic shift of which we are “woefully
underprepared” (McColl, 2022). Housing as a sector has a responsibility to
ensure we are making efforts to support ageing in the right place and in
tackling place, age, and tenure-based social inequalities.
Consultation with the residents is on-going. We have held four consultation
meetings with the residents, including visiting with the residents and their
families who were unable to attend previous meetings. During the initial
engagement tenants have indicated a preference for the relocation of the
Young Street sheltered provision within the West Thomson Street
development citing a more central location, access to maintained outdoor
space, and having the opportunity of living in modern, accessible
accommodation as factors that have influenced their thinking. However, we
intend to undertake a formal consultative exercise with all remaining Young
Street tenants and will report back to a future Housing and Communities
Committee and intend to cease letting activity until November 2025 unless in
emergency circumstances.  It is intended that during this period Young Street
tenants will have an opportunity to visit the Willox Park new build
development.
Gilmour Avenue, Hardgate
The development started on site on 23/9/2024. Following the administration of
the initial contractor (Connect Modular), CCG have been appointed to
complete the 2x 3-bedroom homes. The new estimated completion date is
expected to be September 2025.
Page 63

Page 64

Dennystoun Forge Gypsy/Traveller Site
The project has been scored and assessed as a priority in the new SHIP, with
a proposed site start next financial year 2026/27. Our in-house design team
and procurement colleagues are proceeding to detail our plans, and
discussions are taking place with other council service areas in terms of
assessing potential decant location options to allow the works within the
existing site to commence.
Regular engagement continues with the Dennystoun Forge community
through monthly engagement meetings. The community are supported by
Minority Ethnic Carers of People Project (MECOPP) including representation
by the charity at these engagement sessions.  The regular engagement has
been welcomed by the community and has with dedicated staff resource led
to a strong collaborative focus on the delivery of the new accommodation.
Our focus remains on identifying suitable decant options and on what type of
chalet will be chosen for the final design. We are consulting on to what extent
home design can be customised to meet individual needs.
The Scottish Government is drafting guidance on how these projects will be
funded through the AHSP from 2026/27, and we are contributing to the
consultations on how this will look.
Queen Mary Avenue, Clydebank (Clydebank Gap Sites)
This development proposes 17 new units on the now demolished Queen Mary
Day Centre in Drumry. 
House Type Sustainability Standard Number of New
Homes
1 bed/2 person  Cottage Flat Net Zero 10
2 bed/3 person WCH Cottage Flat Net Zero 1
3 bed/4 person Cottage Flat Net Zero 1
3 bedroom terraced house Net Zero 3
4 bedroom semi-detached Net Zero 2
CCG, with Oliver and Robb architects have undertaken the design stage for
this site and will be appointed as contractor and architect at the construction
stage. 
Planning for this site was granted on 4 July 2025. The team are working
towards a start date on site of October 2025.
Dumbuie Avenue and Smollett Road (Silverton Regeneration)
Page 64

Page 65

The Council has been working on this site for over 10 years, following
structural issues with the properties, structural surveys at the properties at
113-123 Dumbuie Avenue and 8-12 Smollett identified them as deemed
defective.
West Dunbartonshire Tenants were decanted, and the Council bought back,
through our buy back scheme, the houses previously sold under the Right to
Buy.  The last buy back was completed in September 2023.
The 9 houses were demolished in November 2024. Regeneration work will
extend over the 2 sites, which are about 500m apart. An initial feasibility for
this site has identified the potential for around 9 new homes.
The development at Smollett Road is restricted to 3 x 2 storey homes on the
original footprint, due to the ongoing flood prevention works, associated with
the Gruggies Burn flood alleviation project. Our proposed housing mix across
both sites:
Dumbuie Avenue
2 x 3 bed semi-detached
2 x 4 bed semi-detached
2 x 1 bed wheelchair bungalow
Smollett Road
3 terraced properties
2 x 4 bed
1 x 3 bed
Due to the small lot size and the need to continue the design externally,
Committee approval is sought to direct appoint a design and build contractor
from an approved framework to deliver this project up to an estimated cost of
£2,700,00.
We have appointed an external Quantity Surveyor to assist, and consultancy
services will provide the role of Employer's agent.
This project is included within our Strategic Housing Investment Plan, as a
future site and we would look to include this in our pipeline work for 2026/27
for the purpose of funding from the Affordable Housing Supply Budget.
Queens Quay, Site C, Clydebank
The Council has been developing a design to deliver a projected twenty units
on this site to complement the housing mix within sites A and B.  This
development will also be designed to meet low/zero carbon principles and
linked to the Queens Quay district heating network.
.
Page 65

Page 66

Pre-planning response was received on the 25 February highlighting concern
of the WDC development proceeding in isolation. We have adopted a
proactive response to this issue and have developed masterplan diagrams
incorporating the surrounding sites and have conducted valuations on the
adjacent site to Queens Quay C with a view to purchasing additional land to
deliver more affordable housing on the Queens Quay regeneration site. If this
is achieved, we would seek to develop a mixed tenure approach to any
expanded development site delivering one hundred new affordable homes.
We are seeking discussion with CRL (Clydeside Regeneration Limited) to
progress the possibility of acquiring this additional land and will be able to
draw down Scottish Government grant to enable this. However, because of
the uncertainties surrounding potential delivery timescales for this project and
the reduced funding it is no longer allocated funding within the current
Strategic Housing Investment Programme.
Buyback Programme
Total number of properties purchased in 2025/26 financial year 10
Total Purchase Value                            £828,500
PROPERTY SIZE PURCHASED
6 apt 0
5 apt 2
4 apt 3
3 apt 0
2 apt 5
4.6 In 2024/25 the Council’s Annual Resource Planning Assumption (RPA) from
the Scottish Government supporting the delivery of the SHIP was reduced to
£8.167m which represented a cut of around 24%.  However, for 2025/26 the
RPA has been increased to a minimum of £11,053m this will significantly
assist in the delivery of the Council’s SHIP.
4.7 The Housing Development Team are continuously looking for opportunities to
provide additional new build council homes and will bring any potential site to
the Housing and Communities Committee with as much information as
possible as part of the regular More Homes update paper.
5. People Implications
5.1 The delivery of the More Homes delivery programme is managed through
existing resource within the Housing Development & Homelessness team
funded from the Housing Capital Investment Programme. 
6. Financial and Procurement Implications
Financial
Page 66

Page 67

6.1 The Council has to date delivered 584 new homes for social rent; these
additional homes bring council tax revenue of around £810k per year to West
Dunbartonshire Council.
6.2 On 5 March 2025 supported by tenant representatives the Council approved
the Housing Capital Programme 2025-2030 which saw significant resources
committed to the delivery of new council homes in West Dunbartonshire.  A
net expenditure budget of £69m for the affordable housing supply programme
is factored into the HRA Capital Programme.  As it currently stands, it is
anticipated that this programme will complete on project life budget.
6.3 Housing and Finance Officers will continue to assess the ongoing affordability
of future developments within the context of the Housing Revenue Account
Business Plan.
Procurement
6.4 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted within 4.5 of this report will
continue to be prioritised. Where the contract award is less than £213,000,
authority is delegated to the Chief Officer in consultation with the Procurement
Manager to instruct the award of contracts for the planned revenue and
capital spend detailed in this report to suppliers providing the most
economically advantageous offer to the Council.
6.5 All procurement activity conducted by the Council more than £2m is.
subject to a contract strategy. The contract strategy for new housing
development within the HRA Capital Programme will be developed by the
Corporate Procurement Unit in consultation with Housing Development
Officers. The contract strategy will include, but is not limited to; contract
scope, service forward plan, the market, procurement model and routes –
including existing delivery vehicles, roles and responsibilities, risks, issues
and opportunities and on-going contract management. Opportunities to
maximise the positive social, economic, and environmental impact for the
Council through the relevant procurement processes will be developed in line
with procurement policy.
7. Risk Analysis
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis.
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel.
Page 67

Page 68

8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
10. Consultation
10.1 As part of a rent consultation exercise, 92% of respondents indicated their
support for the Council’s ambitious plans to deliver the Housing Revenue
Account (HRA) new council house build programme. In addition, there was
positive support for the wider delivery of new build housing as part of the
recent Local Housing Strategy.  Regular updates on new build development
are provided to the West Dunbartonshire Tenants and Residents Organisation
at the bi-monthly liaison meetings.
11. Strategic Assessment
11.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire.
11.2 Having considered all the Council’s strategic priorities, this report, and the
provision of new supply social housing for rent contributes greatly to all the
Council’s strategic priorities.
Peter Barry
Chief Officer, Housing
Date: 6 August 2025
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Mikayla Deeley, Senior Housing Development Officer,
Housing Development and Homelessness Team,
Housing and Employability: email mikayla.deeley@west-
dunbarton.gov.uk
Page 68

Page 69

Appendices: None
Background Papers: West Dunbartonshire Council’s Local Housing Strategy
West Dunbartonshire Council’s Strategic Housing
Investment Plan
Local Housing Strategy, Health Inequalities Impact
Assessment
Wards Affected: All
Page 69

Page 70

Page 70

Page 71

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 20 August 2025
___________________________________________________________________
Subject:       Scottish Social Housing Charter/Regulation of Social Housing in
Scotland Annual Update Report
1. Purpose
1.1 This purpose of this report is to provide the Housing and Communities
Committee with West Dunbartonshire Council’s annual progress report on
meeting the requirements of the Scottish Social Housing Charter and the
Scottish Housing Regulator’s Regulatory Framework for social housing, including
the approval of our Annual Assurance Statement.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the content of our current Engagement Plan published by the
Scottish Housing Regulator (SHR) on 31 March 2025.
(ii) Notes performance in terms of achieving the Scottish Social Housing
Charter (SSHC) outcomes during 2024/25.
(iii) Notes that a comprehensive assessment of 2024/25 performance has been
carried out and that this has informed a Charter Improvement Plan covering
all the outcomes within the SSHC.
(iv) Notes the key areas of focus for the Housing Improvement Board (HIB)
during 2025/26 which are outlined at 4.16 of this report.
(v) Notes that our assessment of 2024/25 performance will inform the
production and publication of our annual Charter Performance Report for
tenants and other customers.
(vi) Approves our Annual Assurance Statement (AAS) attached as Appendix 1,
to be signed by the Housing Convener on behalf of the Committee and
submitted to the Scottish Housing Regulator as per our regulatory
requirement,
(vii) Notes and commends the achievements of the West Dunbartonshire
Tenants and Residents Organisation (WDTRO) in receiving national
recognition for their work by being awarded the “Tenant Group of the Year”
and “Outstanding Achievement Award” from the Tenant Participation
Advisory Service Scotland (TPAS Scotland). and,
ITEM 10
Page 71

Page 72

(viii) Agrees that a further progress report on the Scottish Social Housing
Charter be submitted to the November 2025 meeting of the Committee,
which will include benchmarking data comparing our performance against
all local authorities in Scotland, as well as Wheatley Homes Glasgow.
3. Background
3.1 The Scottish Government’s first SSHC came into force in April 2012. This was
reviewed during 2016 and again in 2021 and the resulting revised SSHC was
approved by the Scottish Parliament and has effect from 1 November 2022.
3.2 The purpose of the SSHC is to help improve the quality and value of the services
that social landlords provide by:
 Stating clearly what tenants and other customers can expect from social
landlords and helping them to hold landlords to account.
 Focusing the efforts of social landlords on achieving outcomes that matter to
their customers, and,
 Providing the basis for the Scottish Housing Regulator (SHR) to assess and
report on how well landlords are performing.
3.3 The SHR published a revised Regulatory Framework and associated statutory
guidance for social landlords in February 2024 which has effect form 1 April
2024.
3.4 In response to feedback from stakeholders, much of the previous Framework
was maintained, though a new provision to allow the SHR to require landlords to
provide explicit assurance on a specific issue in their Annual Assurance
Statement was introduced.
3.5 The Regulatory Framework reporting timetable is outlined below:
When Who What
Throughout year
Housing Improvement
Board/Tenant
Representatives
Assess performance against the Charter
Outcomes
May each year Housing Development Submission of Annual Return on the Charter
(ARC) to the Scottish Housing Regulator
August each
year
Scottish Housing
Regulator
Publish a report about each social landlord with
key data from its ARC on their website
October each
year
Convener of Housing
and Communities
Committee
Submission of Annual Assurance Statement
(AAS) to the Scottish Housing Regulator
October each
year Housing Development Publication of annual Charter Performance
Report for tenants and other customers
by April, each
year
Scottish Housing
Regulator
Publish an Engagement Plan for each landlord,
highlighting areas where they are seeking further
assurance, based on performance against
Charter Indicators and outcomes and
compliance with statutory obligations
by April, each
year
Scottish Housing
Regulator
Publish a report on the analysis of the sectors’
performance in achieving the Charter Outcomes
Page 72

Page 73

3.6 On the 6 August 2014, Members of the Housing and Communities Committee
agreed that twice yearly reports be provided as follows:
 August Committee - Scottish Social Housing Charter Annual Update Report, and,
 November Committee - Scottish Social Housing Charter Annual Benchmarking
Report and Mid-Year Progress Report – (April-September).
4. Main Issues
4.1 The key areas of focus in relation to the Scottish Social Housing Charter and
Regulatory Framework covered in this report are:
 The publication by the SHR of West Dunbartonshire Councils Engagement
Plan for 2025/26.
 The submission of our Annual Return on the Charter (ARC) to the SHR and
assessment of our progress in relation to achieving the Charter Outcomes. 
 The production and publication of our Annual Charter Performance Report
for tenants and other customers.
 The submission of our Annual Assurance Statement to the SHR, and,
 The continued development of effective tenant scrutiny arrangements in
conjunction with tenants and other customers.
Engagement Plan
4.2 The SHR continues to operate a risk-based approach to inform its engagement
with social landlords. As part of the Regulatory Framework the SHR publishes an
Engagement Plan for all social landlords based on their annual ARC submission,
and for local authorities, homelessness submissions to the Scottish Government.
4.3 Our most recent Engagement Plan published on 31 March 2025 is based on
2023/24 data and states that the SHR will engage with the Council about:
 Tenant and resident safety - due to the low number of valid Electrical
Installation Condition Reports that we have for our properties, which forms
part of the Scottish Housing Quality Standard,
 Services for people who are homeless - due to reported breaches of the
Unsuitable Accommodation Order,
 The management of our Gypsy/Traveller site, and
 Service quality – due to reported weak performance around tenant
satisfaction and factored owner satisfaction.
4.4 The high social and political focus on homelessness within Scotland, alongside
the challenges Council’s face in terms of meeting their statutory obligations, has
resulted in all Scottish local authorities being required to provide further
information in relation to services to homeless people.
Page 73

Page 74

4.5 Similarly, the SHR have included the management of Gypsy/Traveller sites in the
Engagement Plan of all social landlords who are site providers. They have also
indicated that they will seek ongoing assurance around our development plans
for the Gypsy/Traveller site.
4.6 A copy of our current Engagement Plan is available via the West Dunbartonshire
Council website and also the Scottish Housing Regulators website.
ARC submission and assessment of performance against the Charter Outcomes
4.7 West Dunbartonshire Council successfully submitted our ARC with 2024/25
performance data to the SHR within the timescale outlined in the Regulatory
Framework. This process included both internal and external validation
processes, with the Housing Service engaging with Scotland’s Housing Network
(SHN) in terms of a robust external validation of our data.
4.8 The SHR uses these Charter Performance Indicators, alongside data relating to
homelessness submitted to the Scottish Government, to monitor the delivery of
housing and homelessness services against the Charter outcomes and
standards. A copy of the full list of indicators can be accessed via the link
included as part of the background papers.
4.9 The SHR will publish a Landlord Report on their website for each Scottish social
landlord at the end of August 2025 and this report will contain important data
from the ARC (18 key indicators) and will compare our performance with a
Scottish average figure across all social housing landlords operating in Scotland.
4.10 Performance in 2024/25 against these eighteen key indicators and an additional
thirteen indicators that our tenants and customers have informed us are
important to them is outlined in the table below.
Table Key Index
Annual Target Achieved Positive Performance Trend
Annual Target Almost Achieved
(within agreed parameter) Negative Performance Trend
Annual Target Not Achieved No change from previous year
Overall Satisfaction
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target Trend Target
met
% of tenants satisfied with the
overall service 61.3% 87.0% 79.5%
Communication
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target Trend Target
met
average time in working days to
respond in full to complaint - Stage 1 5.98 days 6.62 days 5 days
average time in working days to
respond in full to complaint - Stage 2 22.8 days 24.0 days 20 days
Page 74

Page 75

% of tenants who feel their landlord
is good at keeping them informed
about their services
75.83% 86.8% 82.9%
Participation
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of tenants satisfied with the
opportunities given to participate in
decision making process
69.17% 87.2% 80.9%
Quality of Housing
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of stock meeting the Scottish
Housing Quality Standard (SHQS) 51.19% 69.84% 73.23%
% of existing tenants satisfied with
the quality of their home 62.67% 87.8% 79.1%
Repairs and maintenance
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
Average length of time taken to
complete emergency repairs 5.11 hours 5.09 hours 4 hours
Average length of time to complete
non-emergency repairs 10.94 days 12.16 days 10 days
% of reactive repairs carried out in
the last year Right First Time 85.6% 85.9% 91%
% of repairs appointments kept 92.6% 92.35% 93%
Number of times the statutory
obligation to complete a gas safety
check was not met in the reporting
year
0 0 0
% of tenants satisfied with the
repairs and maintenance service 94.8% 88.3% 87.5%
Estate management, Antisocial behaviour
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of Anti-Social Behaviour cases
resolved within locally agreed targets 98.08% 96.56% 96%
% of tenants satisfied with the
landlord’s contribution to the
management of the neighbourhood
they live in.
62.67% 86.0% 78.9%
Access to housing
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of tenancy offers refused 47% 42% 42%
Tenancy sustainment
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of new tenancies sustained for
more than a year 92.75% 91.09% 93.3%
The average time to complete
medical adaptations 45.4 days 46.5 days 44 days
Homelessness
Page 75

Page 76

Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
Incidences of homelessness in West
Dunbartonshire 1095 994 1202
% of homeless cases with decision
within 28 days of presentation 99.3% 99.1% 95%
% of all homeless cases re-assessed
within 12 months (repeat homeless) 4.3% 4.2% 4%
% of households requiring temporary
accommodation to whom an offer
was made
100% 100% 100%
% of temporary accommodation
offers refused 7.4% 4.4% 10%
Breaches of the Unsuitable
Accommodation Order (UAO) 68 26 0
Value for Money – Rent Collection
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
Rent collected as a % of total rent
due 99.09% 99.58% 99.1%
Gross rent arrears as a % of rent due 9.44% 8.81% 9.3%
% of tenants who feel that the rent
for their property represents good
value for money
60.5% 85.6% 79.1%
Value for Money – Void Management
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of rent due lost through properties
being empty 1.01% 0.85% 1%
Average length of time taken to re-
let properties 34.99 days 25.94 days 30 days
% of tenants satisfied with the
standard of their home moving in 65.6% 67.1% 71%
Gypsy Travellers
Indicator Description 2023/24
Value
2024/25
Value
2024/25
Target
Trend Target
met
% of Gypsy Travellers satisfied with
the landlords’ management of site 94.1%* 94.1%* 90%
*The same satisfaction survey used for both years, so value is identical.
4.11 Of the 31 key indicators outlined above, 19 met the annual target set, with
another 7 narrowly missing this target. Overall, this translates to 84% of these
key indicators either meeting or almost achieving target (up from 68% in
2023/24).
4.12 Compared to the previous year, 22 of the 31 indicators, or 71%, maintained or
improved performance compared to the previous year. Of the 9 indicators where
performance was not maintained, all show only a very slight drop from the
previous year.
4.13 A comprehensive assessment of 2024/25 performance against the Charter
Outcomes has been undertaken, informing our annual Charter Improvement Plan
which was approved by the Housing Improvement Board (HIB) in May 2025.
Page 76

Page 77

4.14 Since our current Engagement Plan has been published, we have reported
updated and substantially improved rates of tenant satisfaction across the full
housing service and it is expected that no further assurance will be sought from
the Regulator around tenant satisfaction.
4.15 Continued improvement around void management remains a key priority for the
service and there is also a desire to get more assurance around our approach to
rent collection including current and former tenant arrears.
4.16 Based on this, the HIB agreed in May 2025 that in addition to quarterly
performance reports covering the whole service, it would closely monitor key
work-streams aimed at driving improvements in the following areas during
2025/26:
 Tenant and resident safety/SHQS compliance (EICR programme).
 Services to people that are homeless (specifically breaches of the UAO and
number of households and time spent in temporary accommodation).
 Actions being taken to improve the satisfaction of factored owners.
 Gypsy Traveller site (development risks).
 Void management, and
 Rent collection (current and former tenant arrears).
4.17 Annual benchmarking data is due to be published by the SHR by the end of August
2025 and the HIB will review annual targets for 2025/26 based on this data and which
challenge the housing and homelessness service to meet their ambition to be one of
Scotland’s top performing landlord organisations.
Production and publication of Annual Charter Performance Report
4.18 The SHR requires all social landlords to produce an Annual Charter Performance
Report for their tenants and other customers no later than 31 October each year.
4.19 The Regulator states that the report should include:
 An assessment of performance in delivering the Charter Outcomes.
 Relevant comparisons with previous years, other landlords and national
performance, and,
 How and when the landlord intends to address areas for improvement.
4.20 In preparation for our first report, a working group of tenants and officers was
established and successfully:
 Agreed how tenants wished to be involved,
 Agreed which indicators should feature in the report, and
Page 77

Page 78

 Agreed the best style and format to ensure that the report is user friendly and
easy to understand.
4.21 Further engagement was conducted with tenant representatives during August
and September 2020 to review and update this report, in preparation for the
revised Charter coming into effect. This consultation again influenced the style,
content, and format the report and the update of the Service Standards that are
in place across housing services, and which are reported regularly to tenants and
other service users (via website and insert with Housing News).
4.22 Our Annual Charter Performance Report for 2024/25 will be based on the annual
self-assessment of our performance and the Charter Improvement Plan approved
by the HIB that covers all the outcomes outlined in the SSHC.
4.23 The report will be published online by the end of October 2025 and a summary will
be sent to every tenant with the winter edition of the Housing News. The full report
will be sent to tenants’ groups. interested tenants, partner organisations and elected
members.
Annual Assurance Statement
4.24 The Regulatory Framework requires all social landlords to submit an Annual
Assurance Statement (AAS) to the SHR by the end of October each year.
4.25 The AAS requires landlords to state that:
 They are meeting the standards and outcomes outlined in the SSHC.
 That they are compliant with their statutory and regulatory obligations relating
to housing and homelessness.
 That they are compliant with their statutory and regulatory obligations relating
to equality and human rights, and,
 That they are compliant with their statutory and regulatory obligations relating
to tenant and resident safety.
4.26 Any areas of material non-compliance should be highlighted in the AAS
alongside the details of the actions being taken to address these issues.
4.27 We have conducted a process of reviewing and updating our AAS informed by
the completion of an AAS self-assurance toolkit attached as a background paper
to this report.
4.28 This completed toolkit allows us to assess how we comply with our wider legal
and regulatory obligations relating to housing and homelessness, equality and
human rights and tenant and resident safety.
Tenant and resident safety
4.29 A letter from the Scottish Housing Regulator received in March 2025 stated that
for this year, there is a request that landlords provide specific assurance on their
compliance with relevant obligations in relation to tenant and resident safety.
Page 78

Page 79

4.30 Our obligations around tenant and resident safety are monitored closely by
Building Services. This includes areas such as gas safety, electrical safety, fire
safety, lift safety, asbestos safety, water safety and damp and mould.
4.31 We collect a number of performance indicators relating to these areas, which
have been reported annually to the Housing and Communities Committee over
recent years and are outlined in the table below:
Tenant Safety Indicators 2021/22 2022/23 2023/24 2024/25
Number of times not met statutory obligation to
complete a gas safety check within 12 months 0 0 0 0
% of properties with a valid EICR certificate 41.33% 50.97% 56.9% 73.4%
% of properties complying with Satisfactory Fire
Detection and Satisfactory Carbon Monoxide
Detection standards
94.22% 100% 97.3% 98.8%
4.32 From September to November 2024 the SHR consulted on proposals on a
revised set of indicators to measure how well social landlords are achieving the
outcomes outlined in the Scottish Social Housing Charter which will be included
in a revised Annual Return on the Charter (ARC).
4.33 In January 2025 they published a final revised set of ARC indicators which social
landlords are required to start collecting data for from 1 April 2025, including the
following indicators relating to tenant and resident safety:
 Electrical Safety: number of times the requirement to complete an electrical
safety inspection (EICR) within five years of the last EICR was not met.
 Fire Safety: number of homes that do not have satisfactory equipment for
detecting fire and giving warning in the event of fire or suspected fire
installed.
 Damp and mould:
 Average time taken to resolve cases of damp and/or mould.
 % of resolved cases of damp and/or mould that were reopened.
 Number of open cases of damp and/or mould at the year end.
Performance against these indicators will be reported to the Committee as part of
future Scottish Social Housing Charter performance reports.
4.34 The detail of our approach to tenant and resident safety is outlined in the AAS
self-assurance toolkit and we are satisfied that we are meeting our statutory
obligations except for the low number of valid Electrical Installation Condition
Reports (EICRs) that we hold for our properties.
4.35 We continue to make progress in this area, an EICR is completed in every
property that becomes vacant, in properties that have any major electrical works
Page 79

Page 80

completed and we are also targeting properties where any capital improvement
works are being carried out.
4.36 At the end of June 2025, 8324 or 78.9% of our properties had a valid EICR in
place and our current projection is that the programme will be up to date by
December 2025.
4.37 There are currently no cases being investigated by the Health and Safety
Executive (HSE) relating to the safety of our tenants and residents and there
have been no cases investigated during the past year.
Equality and human rights
4.38 In keeping with the key messages from Scottish Government’s programme for
Government, equality and human rights are central to our delivery of our Local
Housing Strategy (LHS). The development of the strategy has been underpinned
by West Dunbartonshire Council’s commitment to promoting and sustaining
equality and inclusion, and equality and diversity principles.
4.39 We worked closely with the West Dunbartonshire HSCP in piloting a Health
Inequalities Impact Assessment Tool, with each of the five themes being
separately assessed and these assessments contributing to the final version of the
LHS.
4.40 An Equalities Impact Assessment (EIA) is used for any new and developing
policies. During 2021/22 we reviewed and updated our approach to collection of
Equalities data based on published guidance and continue to monitor that this is
being effectively implemented. Improved data held across all protected
characteristics continually improves the robustness of EIA’s that are carried out.
4.41 Based on our performance against the Charter Outcomes and the information in
the AAS self-assurance toolkit, the following areas of material non-compliance
have been identified and have been highlighted in our AAS attached as
Appendix 1:
 Low compliance with the SHQS due to number of properties without a valid EICR in
place.
 Lack of compliance with homelessness duties due to reported breaches of the
Unsuitable Accommodation Order.
 Failure to submit updated data in relation to factored owners’ satisfaction (as per
SHR guidance).
4.42 As outlined in the SHR guidance, the AAS is a short, succinct document, in a
simple format and highlights actions being taken to address these areas of non-
compliance.
4.43 The central aspect of the AAS is that the Committee has been provided with the
necessary assurance in terms of information and evidence where required, to
support the content of the AAS.
Page 80

Page 81

4.44 The AAS toolkit outlines a wide range of arrangements that are in place to
provide members of the Committee with the assurance and evidence that we are
meeting our regulatory and statutory obligations, which is proportionate and not
overly burdensome, as per the SHR guidance.
4.45 Following the AAS being approved by the Committee, it should be signed by the
Convenor and submitted to the SHR as per the regulatory requirement. As per
SHR guidance, it will then be published to ensure that it is accessible to tenants
and other customers.
Tenant Scrutiny Arrangements
4.46 The statutory regulatory framework for housing and homelessness services
requires that tenants participate in scrutinising landlord performance against the
Charter and requires that:
 The form of involvement has been agreed with tenants.
 Involvement is effective and meaningful and that tenants have a real say in
assessment of performance.
 The approach is publicised to tenants; and
 Landlords’ can demonstrate the agreed approach was implemented.
4.47 Developing effective tenant scrutiny is therefore a challenging process, however
following support from the Scottish Government’s “Stepping Up to Scrutiny”
training programme in which elected members took part, these requirements
were successfully met and in November 2014 the Housing and Communities
Committee approved the establishment of our Tenant Scrutiny Panel with clear
terms of reference.
4.48 The Scrutiny Panel has subsequently carried out the following scrutiny exercises:
 2014/15 looking at our Anti-Social Behaviour Service.
 2015/16 looking at our Repairs Service.
 2016/17 looking at tenancy sustainment, specifically the new tenant visit
process.
 2017/18 looking at SHQS compliance, specifically the number and reasons
that properties that are held in abeyance.
 2018/19 looking at the timescales taken to complete medical adaptations.
 2020/21 looking at the complaints process and time taken to respond to
complaints.
 2022/23 looking at new tenant visits, and,
 2024/25 looking at the processes around reporting repairs.
4.49 All of the recommendations made in the Panel’s eight reports to date were
approved by the HIB and progress in terms of implementing these are monitored
and regular feedback provided to the Scrutiny Panel.
Page 81

Page 82

4.50 At the time of writing the Panel are looking at our latest performance information
and using that to consider the focus of their next scrutiny exercise.
4.51 The Scrutiny Panel were successful in being shortlisted for a prestigious
Chartered Institute of Housing (CIH) excellence award in 2021 and though
narrowly missing out, this was national acknowledgement of the work that they
do to ensure that tenant scrutiny is a valued part of WDC’s approach to
performance management.
4.52 The West Dunbartonshire Tenants and Residents Organisation (WDTRO) also
continue to be heavily involved in the scrutiny of the Housing Service and in June
2025 received national recognition for their work when they were awarded
“Tenant Group of the Year” and “Outstanding Achievement Award” from the
Tenant Participation Advisory Service (TPAS).
4.53 The continuing work of the Joint Rent Group comprising tenants, Council officers
and the Convener of the Housing and Communities Committee, looking at the
rent setting process and the guidance in relation to the Housing Revenue
Account, remains important in ensuring Housing and Homelessness Services
provide best value for current and future tenants.
5. People Implications
5.1 There are no people implications because of this report. Delivery on the
requirements of the SSHC and Regulatory Framework is managed from within
existing staffing resources.
6. Financial and Procurement Implications
6.1 There are no direct financial or procurement implications in relation to this report.
The improvement plan informed by the Charter self-assessment exercise will be
delivered from within existing budgets.
7. Risk Analysis
7.1 There is a significant risk that failure to respond appropriately to the
requirements of the SSHC and the SHR’s Regulatory Framework would attract
an adverse reaction from the SHR and may have wider consequences for the
Council in the context of Best Value.
7.2 At the time of writing we expect our next Engagement Plan to be published by
the SHR in March 2026.
8. Equalities Impact Assessment (EIA)
8.1 Equalities legislation requires that new or significantly changing policies or
services and financial decisions should be subject to an assessment of their
impact on the wellbeing of certain groups of people. The recommendations
within this report do not alter any existing policy or pattern of service delivery and
so is not considered to require an equalities impact assessment.
Page 82

Page 83

9. Consultation
9.1 The Council has in place a well-established and proactive tenant and residents’
organisational structure. The WDTRO meet with the Council (co-chaired by the
Convener of the Housing and Communities Committee) on a bi-monthly basis to
discuss all issues relating to the Housing Service.
9.2 There remains a strong appetite among tenants and customers to continue to
participate actively to improve housing services in West Dunbartonshire. This is
reflected in the successful partnership approach adopted to develop the Charter
Performance Report and the on-going activities of the WDTRO, the Joint Rent
Group the West Dunbartonshire Scrutiny Panel.
9.3 The Council is committed to ensure consultation continues and will support
arrangements to increase tenant scrutiny activities and assess our performance
in line with the requirements under the SSHC and the SHR’s Regulatory
Framework.  Our approach was commended via an external validation exercise
by the Tenant Participation Advisory Service (TPAS) Scotland, which again
awarded West Dunbartonshire Council a Gold Accreditation for excellence in
tenant participation in 2023.
10. Strategic Assessment
10.1 Having considered the Council's strategic priorities, this report contributes
significantly to all five strategic priorities and specifically to improving local
housing and environmentally sustainable infrastructure.
Peter Barry
Chief Officer, Housing Services
Date: 11 July 2025
___________________________________________________________________
Person to Contact:        John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing Services. email: john.kerr@west-dunbarton.gov.uk
Stefan Kristmanns - Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing
Services. email: stefan.kristamanns@west-dunbarton.gov.uk
Appendices: 1. WDC Annual Assurance Statement August 2025
Background Papers:     Scottish Social Housing Charter/Regulation of Social Housing
in Scotland Annual Update Report,
Report by Chief Officer, Housing and Employability,
Housing and Communities Committee, 21 August 2024.
West Dunbartonshire Council, Annual Assurance Statement
August 2024.
West Dunbartonshire Council | Scottish Housing Regulator
Page 83

Page 84

Scottish Housing Regulator WDC Landlord Report 2023-24,
August 2024.
West Dunbartonshire Council | Scottish Housing Regulator
Annual Charter Performance Report for Tenants and other
Customers 2023/24, West Dunbartonshire Council, October 2024
Charter Performance Report | West Dunbartonshire Council
(west-dunbarton.gov.uk)
Scottish Social Housing Charter Annual Benchmarking and
Mid-year Progress Report,
Report by Chief Officer, Housing and Employability,
Housing and Communities Committee, 20 November 2024.
West Dunbartonshire Council’s Engagement Plan, Scottish
Housing Regulator, 31 March 2025
Engagement plan from 1 April 2025 to 31 March 2026 |
Scottish Housing Regulator
AAS self-assurance toolkit 2025, West Dunbartonshire Council,
July 2025.
“Involving You to Improve Housing Services” West
Dunbartonshire Council’s Tenant Participation Strategy 2025-
2028.
Tenant participation strategy | West Dunbartonshire Council
The Scottish Social Housing Charter: Indicators and Context
Information, Scottish Housing Regulator
https://www.housingregulator.gov.scot/landlord-
performance/national-reports/national-reports-on-the-scottish-
social-housing-charter/about-the-scottish-social-housing-
charter
Wards Affected:             All    
Page 84

Page 85

August 2025
West Dunbartonshire Council Annual Assurance Statement
As Convenor of the Housing and Communities Committee I confirm that we have seen
appropriate evidence to give us assurance that:
 We comply with all the relevant regulatory requirements set out in Chapter 3
of the Scottish Housing Regulator's Regulatory Framework.
 We are achieving all the relevant standards and outcomes outlined in the
Scottish Social Housing Charter, and
 We are compliant with all relevant legislative duties associated with housing
and homelessness services, tenant and resident safety and equality and
human rights.
We comply with all the above requirements except for the areas set out below:
Low compliance with the Scottish Housing Quality Standard
Tenant safety within the Councils’ housing stock is one of our main priorities and a key
concern remains in terms of our rate of compliance with the Scottish Housing Quality
Standard. The key driver for this is the number of properties without a valid Electrical
Installation Condition Report (EICR).
Whilst we continue to make progress in this area, access to tenants’ homes remains a
challenge and we are continually reviewing procedures, processes and our
communications with tenants to address this and minimise instances where forcing
access to a property is considered. In addition to our focus on tenanted homes, an EICR
is completed in every property that becomes vacant and in properties that have any major
electrical works completed. We remain committed in our efforts to ensure that each
Council home has a valid EICR in place and will continue to provide monthly updates on
the progress being made.
Lack of compliance with homelessness duties
Whilst we continue to meet most of our homelessness duties including our statutory
responsibility of offering temporary accommodation to those that need it, we continue to
report breaches of the Unsuitable Accommodation Order (UAO).
Pressures around the homelessness system was one of the key contributing factors to us
declaring a Housing Emergency within West Dunbartonshire in May 2024. Challenges
remain in terms of the time being taken to move households experiencing homelessness
into settled accommodation and the subsequent pressures which exist in terms of
providing suitable temporary accommodation.
Progress has been made, with reported breaches of the UAO reducing from 68 in
2023/24, to 26 in 2024/25. This remains a key area of focus, and we have a number of
ITEM 10 - APPENDIX 1
Page 85

Page 86

actions in both our Housing Emergency Action Plan and Housing Solutions Strategy
which aim to ensure that we are doing all that we can to minimise any future breaches of
the Unsuitable Accommodation Order.
Failure to submit updated data in relation to factored owners’ satisfaction
Our last satisfaction survey of factored owners was carried out in March 2022, and
we have submitted data from this survey as part of our ARC for 2021/22, 2022/23
and 2023/24. We had planned to carry out a new survey during 2024/25 and provide
updated satisfaction data as part of this years' ARC submission. Unfortunately, due
to staffing pressures this survey was not conducted within our expected timeframe,
and we therefore have submitted the same satisfaction for the fourth year running.
We are currently taking forward an updated satisfaction survey of factored owners
and hope to have this completed by the end of August 2025.
Tenant and resident safety
A letter from the Scottish Housing Regulator received in March 2025 stated that for
this year, there is a request that landlords provide specific assurance on their
compliance with relevant obligations in relation to tenant and resident safety.
Our obligations around tenant and resident safety are a key priority for our
Maintenance, Repair and Asset Improvement Services managed by Building
Services and are monitored closely. This includes areas such as gas safety,
electrical safety, fire safety, lift safety, asbestos safety, water safety and damp and
mould.
Relevant assurance around tenant and resident safety is provided to the Housing
and Communities Committee and we can confirm that there are currently no cases
being investigated by the Health and Safety Executive (HSE) relating to the safety of
our tenants and residents and there have been no cases investigated during the last
year.
We are therefore assured that we comply with all the relevant safety requirements
and duties in relation to tenant and resident safety (with the exception of the low
number of EICR’s highlighted above).
Our Annual Assurance Statement was considered at a meeting of the Housing and
Communities Committee on 20 August 2025 and was formally approved and
subsequently signed by me as Convenor.
Councillor Gurpreet Singh Johal,
Convenor, Housing and Communities Committee
20th August 2025
Page 86

Page 87

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing
Housing and Communities Committee: 20 August 2025
___________________________________________________________________
Subject:  Home at the Heart - West Dunbartonshire’s Rapid Re-Housing
Transition Plan update and new approaches to homelessness
progress report.
1. Purpose
1.1 The purpose of this report is to provide members with an update on “Home at the
Heart” WDC’s Rapid Re-housing Transition Plan (RRTP) for the period 2019-25
and new approaches to homelessness, including:
- Progress update for Year 6 and Year 1 plans for WDC’s new Housing
Solutions Strategy “More than a Roof”.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note and agree the progress and challenges made in the six years of
“Home at the Heart”, which will inform a report to the Scottish Government
at the start of October 2025 and note the main objectives for Year 1 of
“More than a Roof” in sections 4.27 – 4.43 of this report;
(ii) Note that the Council’s housing allocation letting target for homeless
households is 59% for 2025/26 as set out in section 4.35 of this report and
note the Chief Officer, Housing will keep this target under close review
based on current modelling projections;
(iii) Note the continued uncertainty around future funding referenced in section
6 of this report; and
(iv) Note that Scottish Government funding of £257,000 has been awarded for
2025/26 for the specific delivery of West Dunbartonshire’s Housing
Solutions Strategy.
3. Background
3.1 The Council’s approach to tackling homelessness is outlined in the RRTP “Home
at the Heart” and reinforced within the new Local Housing Strategy approved by
the Housing and Communities Committee in November 2021. This approach
builds on the good progress made within West Dunbartonshire by previous
strategies, most recently the “More than a Roof” approach which covered the
period 2017/2020, whilst also acknowledging the challenges set by the renewed
Scottish Government national commitments to tackle homelessness, to end rough
sleeping and to transform temporary accommodation.
ITEM 11
Page 87

Page 88

3.2 “Home at the Heart” was developed in response to a key recommendation from
the Homelessness and Rough Sleeping Action Group (HARSAG) that was
adopted by the Scottish Government, for Local Authorities to develop and submit
a RRTP for the period 2019-2024. The Scottish Government confirmed a one-
year extension to allow for its continued delivery for a sixth year due to
challenges around implementation.
3.3 It was developed in partnership with key stakeholders, including HSCP and the
wider Housing Solutions Partnership, which includes local Registered Social
Landlords. It was submitted to the Scottish Government on 31 December 2018
and retrospectively approved by the Housing and Communities Committee on 6
February 2019.
3.4 Regular reports have been provided to the Housing and Communities
Committee, initially detailing, and seeking approval for the RRTP and
subsequently providing updates in terms of progress being made and approving
the use of Scottish Government funding to deliver the key objectives.
4. Main Issues
4.1 The aims of “Home at the Heart” in terms of tackling homelessness are
influenced by the Scottish Social Housing Charter and consistent with the
Scottish Government’s “Ending Homelessness Together” approach and are
structured around the following four strategic objectives:
 Deliver a whole systems approach to the prevention of homelessness;
 Enable service users with low or no support needs to access settled housing
quickly;
 Develop interim housing options which enable independent living and
tenancy sustainment; and
 Implement a Housing First model which enables the most excluded service
users to secure sustainable housing.
“Home at the Heart” Year 6 Progress
Objective 1: Deliver a whole systems approach to the prevention of
homelessness.
4.2 The Prevention Officer has continued to engage with households at risk of
homelessness. This has included managing the pilot prevention fund which in
the 5 years has made payments directly to households totalling £29,200 and
has helped ensure that 73 existing tenancies were sustained and
homelessness prevented.
4.3 The overall number of approaches to WDC’s Housing Options service had
increased significantly in 2021/22 linked to the Tenant Hardship Fund but high
demand continued in 2022/23. This has continued into 2024/25 as there has
been a 13% increase in approaches since 2023/24, highlighting that the request
for assistance remains high. 72% of cases have been prevented from becoming
homeless.
Page 88

Page 89

4.4 Since the end of emergency legislation banning evictions taking place in both
the social and private rented sector, there has been an increase in Section 11
notices, from 20 in 2020/21 to 158 in 2024/25. Of those where contact was
made and there was engagement with the household, homelessness was
prevented in 86% of cases, up from 83% last year.
4.5     Changes to the allocations policy with the creation of a youth priority prevention
has now been fully embedded and has had a positive impact. Since its
introduction at the end of 2022, WDC has housed fifty-nine young people
through the scheme, with a further thirty are awaiting a subsequent offer. The
scheme has been successful in reducing the number of young people
presenting themselves as homeless from 265 in 2023/24 to 216 in 2024/25.
4.6    Work has started with RSL partners to assess the benefits and explore options.
around creating a Common Housing Register for social landlords within West
Dunbartonshire.
Objective 2: Enable service users with low or no support needs to access
settled housing quickly.
4.7 One of the key objectives of WDC’s RRTP is to ensure that homeless
households can access settled accommodation as quickly as possible. A key
target is reducing the length of time homeless households with no/low support
needs spend in temporary accommodation.
4.8     A RRTP model has been developed which considers the level of new homeless 
decisions, the backlog of homeless households, projected future demand, the          
number of lets made to homeless households and projected letting activity. The          
RRTP model uses this data to determine the number of lets that will be required          
for homeless households on an annual basis and determines a projected lettings
% target.
Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL
Year 6 target Year 6 actual
Lets required to meet demand 760 697
Split LA 518 554
Split RSL 242 143
% Allocation of lets required
LA 69% 63%
RSL 69% 46%
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
Prevent1 approaches 178 240 332 576 455 384 433
Prevent1 closures 177 221 249 378 654 385 461
% homelessness prevented 64% 57% 51% 52% 72% 67% 72%
% closed with presentation 24% 26% 27% 31% 18% 25% 19%
Page 89

Page 90

4.9   Despite an improvement from last year, the turnover of available RSL properties
was lower than projected, thus impacting available lets. Although WDC
exceeded its target for lets to homeless households, it failed to meet its allocation
target of 69% due to achieving significantly more overall lets than projected, 947
as opposed to the 750 target and less Youth Prevention Lets, 4% as opposed to
the 5% target.
4.10 There are now 278 households in temporary accommodation, including 116
children. 56 households have been waiting longer than a year to be housed and
28 of these households are in temporary accommodation.
4.11 Despite this, the average times for 2024/25 decreased and we achieved the
target of 16 weeks.
Objective 3: Develop interim housing options which enable independent living
and tenancy sustainment.
4.12 There continues to be a range of interim housing options available in West
Dunbartonshire for those homeless households with more complex support
needs. This includes supported tenancies in the community, as well as residential
supported accommodation where this need is identified.
4.13 Residential supported accommodation offers temporary accommodation and on-
site support to alleviate homelessness and enable homeless households to make
a planned transition to settled accommodation. The key recommendations of the
Review of Supported Accommodation continued to be taken forward in Year 6, an
additional staff member was successfully recruited to lead on the development and
delivery of new residential supported accommodation, the new project plan was
approved, the timescales for the recommendations have been embedded and the
project board has been established.
4.14    There was a target of forty conversions in Year 6, however only thirty were
completed due to issues around delays in gas and electricity safety checks and
sign-ups.
4.15      At the end of Year 6 work around WDC’s Joint Mental Health, Addictions,           
Homeless and Housing Services Protocol began to progress.
4.16     Research was conducted around barriers that LGBTQ+ communities may face in
accessing homeless and housing services to help improve future practice.            
and enable positive housing outcomes for all.
Objective 4: Implement a Housing First model which enables the most excluded
service users to achieve housing sustainment.
4.17     The available funding in Year 6 of WDC’s RRTP did not allow for the expansion
of the Housing First service but did provide funding for 8 Housing First workers,
however, due to the current restructure of the homeless service there has been
delays in recruitment which has meant that the Housing First service had to
operate at a reduced staffing capacity of 5.
Page 90

Page 91

4.18 By the end of 2024/25, 8 new Housing First tenancies had been created, a
further 4 clients are awaiting an offer of settled accommodation being made.
4.19 12 tenancies are being sustained where the Housing First support has been
“stepped down”, meaning a planned exit from the Housing First Service.
4.20      Whilst WDC’s Housing First approach continues to have a high overall tenancy
sustainment rate. Sadly 7 of these tenancies have ended due to the  
death of tenants.
4.21 A key objective in Year 6 of the RRTP was to assess the impact of the 
tendered Housing First Service with Blue Triangle Housing Association and            
due to the positive feedback received the decision has been made to extend          
the contract for a further 12 months, until February 2026.
4.22     A full review of the Housing First service has been carried out, including            
stakeholder, staff and service user consultation to help frame the future of            
the service. Survey responses were positive, especially with regards   
to service user experiences, however recommendations include further clarity
around staff roles, most notably regarding the involvement of Housing First            
workers at different stages. 
“More than a Roof”
4.23   More than a Roof is West Dunbartonshire Council’s 6th Homeless Strategy            
with a strong focus on finding housing solutions for those households in need.          
This strategy covers the period from 2025 to 2028, which means it is aligned          
with the current Local Housing Strategy which also runs until 2028.
4.24   This approach aims to build on the achievements of “Home at the Heart”, WDC’s
Rapid Rehousing Transition Plan. It has been developed within the backdrop of a
Housing Emergency both locally and nationally, where demand is higher than          
ever, and supply is reducing.
4.25   The strategy was produced in partnership with key stakeholders, which                
importantly included in-depth consultation with households experiencing          
homelessness and staff working in the service and takes account of these 
opinions around how we can end homelessness in West Dunbartonshire.
4.26   Following this process, four key objectives were identified:
1. Homelessness is prevented by providing good quality advice and
information to          enable informed decisions on personal housing
solutions,
2. Where homelessness does occur households are rehoused quickly,
3. Review and ensure there are a wide range of support services available to
prevent and end homelessness, and
4. Working with partners to provide interim options for temporary
accommodation and providing best quality temporary accommodation
where required.
Page 91

Page 92

Year 1 Plan
4.27 In order to achieve these objectives over the three-year period the following 
actions will be taken in Year 1:               
Objective 1: Homelessness is prevented by providing good quality advice
and information to enable informed decisions on personal housing           
solutions.
4.28 A variety of measures will continue to be used to prevent homelessness within
West Dunbartonshire including the homeless service implementing a service
redesign to a housing solutions focus which will review the Council’s delivery
of housing options interviews and personal housing solutions plans.
4.29 The £17,633 unspent prevention fund from last year will be used to continue to
support households at risk of homelessness in West Dunbartonshire.
4.30 The continued monitoring of the revised allocations policy 
which creates young people at risk of homelessness as an additional group            
given a reasonable preference within the policy. 
4.31 Following on from the pilot Section 11 programme, there will be a review to
determine if extending earlier Section 11 referrals fits with new prevention
duties.
4.32 As part of WDC’s work towards a Common Housing Register, a shared housing
application form will be rolled out and a working group will be introduced to    
review the shared from. The creation of shared medical and change of    
circumstance forms will also be explored alongside RSL partners.
Objective 2: Where homelessness does occur, households are rehoused
quickly.
4.33 Due to the continued demand and pressures around the provision of temporary
accommodation in West Dunbartonshire it has been decided that the target time
homeless households with no/low needs spend in temporary accommodation
will be maintained at 16 weeks.
4.34 Currently modelling suggests that for 2025/26 for West Dunbartonshire, 92% of
all available social tenancies, inclusive of conversions and Housing First will
require to be allocated to homeless households to ensure targeted reductions in
temporary accommodation and faster access to settled accommodation is
achieved.
4.35 While this will not be achieved, after recognising other housing need factors it    
would not be practical to have 92% allocation of lets to homeless households.    
Therefore, partners have been asked to agree a 59% lettings target to 
homeless households. This objective was supported by the Housing 
Improvement Board in terms of lets made by the Council and a similar
commitment was sought from RSL partners via their annual Housing Solutions
Contribution Statements.
Page 92

Page 93

Calculation of homeless lets required and % of expected letting
activity required to meet need - split by LA & RSL
Year 1
Lets required for to meet demand 693
Split LA 531
Split RSL 162
Projected turnover  Year 1
Split LA 900
Split RSL 275
% Allocation of lets required Year 1
LA 59%
RSL 59%
4.36 As 59% is not enough to fully meet demand and clear the backlog of households
in temporary accommodation, this will result in a shortfall of around 389 lets and
sixty-four additional units required for temporary accommodation.
4.37 If additional temporary accommodation units are required, this reduces lets 
available for mainstream offers and would also require additional staff    
resources to manage the additional units.
Objective 3: Review and ensure there are a wide range of support services
available to prevent and end homelessness.
4.38 The review of Residential Supported Accommodation will continue to progress             
in Year 1. The review recommendations will be taken to a future Housing and           
Communities Committee for approval, monthly meetings with the Project Board             
will continue and an updated progress report will be presented to a future           
Housing and Communities Committee.
4.39 To deliver the optimum service model, it is anticipated that a three-year plan will 
be required to support the implementation of any future proposals.
4.40 WDC’s Joint Mental Health, Addictions, Homeless and Housing Services Protocol
will be finalised in Autumn 2025/26 and will be rolled out across the wider Housing
Solutions Partnership.
4.41 Follow up work with LGBTQ+ groups will be carried out to further   
explore barriers and identify solutions to achieving sustainable housing outcomes.
Objective 4: Working with partners to provide Interim options for
temporary accommodation and providing best quality temporary
accommodation where required.
Page 93

Page 94

4.42 Once Human Resources processes are concluded and the restructure of the
homeless service has occurred WDC’s Housing First service will be back to full
capacity of 8 staff members.  Whilst the available funding will ensure the service
operates with 8 housing first support workers enabling support to continue to be
provided to the 32 active tenancies and the 4 waiting to be housed carried over
into Year 1, it does not allow the service to be expanded further to fully meet
identified demand. Thus, collaborative funding options for Housing First will
be explored with HSCP partners.
4.43 The impact of the additional tendered Housing First Service will continue to be
assessed to decide whether to extend beyond 2025/26.
Funding update
4.44 In May 2025, the Scottish Government confirmed in its Programme for
Government that a further £8 million would be provided to local authorities to
support their approaches to homelessness and scale up the Housing First
approach nationally for 2025/26.
4.45 The formula still being used to allocate local authorities share of this funding is
based on the number of homeless assessments made in a local authority area
over a three-year period. There has been some criticism of this approach as it
does not consider homelessness prevention work within the assessment. It can
therefore act as a disincentive to make the wider system changes advocated
within Ending Homelessness.
4.46 The Scottish Government and COSLA had hoped to explore the possibility of
joining up the funding stream for preventing and responding to homelessness
with the rapid rehousing funding stream and to look at alternative distribution
formulas. However, this work has been delayed due to competing priorities.
4.47   The same formula has therefore been used for the funding allocation for
2025/26. This formula has resulted in an allocation for West Dunbartonshire
Council of £257,000 to deliver Year 1 of our Housing Solutions Strategy which
was announced on 13th May 2025.  In addition, the Scottish Government have
also confirmed the funding allocation to West Dunbartonshire Council for the
provision of homelessness prevention and response services, this is provided
within the revenue grant provided to local authorities by the Scottish
Government.
Housing Solutions Year 1 funding
Year 6 underspend £91,663
SG funding for Year 1 £257,000
Year 1 total funding £348,663
4.48 A full review of Year 6 activities has been carried out and the Year 1 Housing
Solutions plan has been refreshed to take account of available funding.
Page 94

Page 95

Housing Solutions Year 1 costings
Blue Triangle Housing First Project £48,500
Pilot Prevention Fund £17,663
Conversion Programme £93,000
Youth Budget £158,500
Resettlement Support £31,000
Year 1 total cost £348,663
With WDC’s Housing First service now being fully funded internally, this          
year’s additional SG funding will be used to pilot services around improving
housing outcomes for young people and providing resettlement support.         
Housing Emergency
4.49 The Council declared a housing emergency on 1st May 2024 due to the
extreme pressures facing housing and homelessness services within West
Dunbartonshire. A national housing emergency was declared by the
Scottish Government on 15th May 2024.
4.50 An updated report on the progress of West Dunbartonshire’s Housing
Emergency Action Plan is Item 8 on the agenda for the Housing and
Communities Committee on the 20th of August 2025.
5. People Implications
5.1 Any additional post required to strengthen the team will be recruited in line with
the Council’s existing recruitment policy and will be funded from the Scottish
Government funding for the provision of homelessness prevention and response.
6. Financial and Procurement Implications
6.1 The Minister for Housing wrote to West Dunbartonshire on 13th May 2025
advising of the Council’s Housing Solutions funding allocation for 2025/26 of
£257,000. This funding will be included in the regular payments of the 2025/26
General Revenue Grant.
6.2 In addition the Scottish Government’s funding allocation to West
Dunbartonshire Council for the provision of homelessness prevention and
response has been confirmed, this funding will be paid as part of the General
Revenue Grant payment, with the first payment in 2025/26 made on 1 April
2025. 
6.3 Further Housing Solutions funding beyond 2025/26 is unclear. Committee will
be updated at a future meeting once confirmed plans for future years are
received.
Page 95

Page 96

6.4 There has been some national discussions looking at reviewing funding to
deliver homelessness and housing option services, however, there remains
some financial uncertainty in terms of how the Housing First approach can be
funded in the longer term.
6.5 The delivery of WDC’s wider Housing Solutions Strategy will be within existing
budgets noting the increases in such because of the Scottish Government
funding for 2025/26.
6.6 There are no procurement implications in terms of this report.
7. Risk Analysis
7.1 There are financial and regulatory risks associated with not being able to fully
deliver our Housing Solutions Strategy, including the Housing First element of
the approach.
7.2 The decision to award funding for a further year was based again on a formula
which focuses on homelessness assessments (and not the content of homeless
strategies), which benefits larger local authorities who receive a higher
proportion of homeless assessments and could discourage local authorities
from implementing initiatives aimed at preventing homelessness.
7.3 There is no confirmation of Housing Solutions funding beyond this year
(2025/26) therefore long-term funding is required to be sourced to continue
planned activities.
8. Equalities Impact Assessment (EIA)
8.1 There are no negative equalities impacts due to the implementation of WDC’s new
Housing Solutions Strategy, however preventing and responding to homelessness
has a significant positive impact on individuals and communities. There are
potential positive impacts for some groups as noted in the EIA conducted for the
Housing Solutions Strategy in February 2025, EIA 1222.
9 Environmental Sustainability
9.1 Our current and future approach to strategic housing asset management will
continue to prioritise a ‘zero carbon’ approach to decision making and
deliverability and this will be done the aims of the Housing Asset Management
Strategy and the Council’s Climate Change Strategy.
10. Consultation
10.1   The Housing Solutions Strategy was developed in collaboration with key            
partners, including HSCP, local RSLs, third sector organisations, WDTRO (West
Dunbartonshire Tenants and Residents Organisation and households
experiencing homelessness, via focus groups, surveys, staff meetings and
community and stakeholder events.
Page 96

Page 97

11. Strategic Assessment
11.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities.
Peter Barry
Chief Officer, Housing
Date: 6 August 2025
___________________________________________________________________
Person to Contact:      John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability, telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk                              
Donna Kirkwood, Senior Housing Development Officer,
Housing Development and Homelessness Team, Housing                                         
and Employability, email:
donna.kirkwood@westdunbarton.gov.uk
Appendices: None
Background Papers:  
Ending Homelessness Together – High Level Action Plan;
Scottish Government/COSLA
https://www.gov.scot/binaries/content/documents/govscot/
publications/publication/2018/11/ending-homelessness-
together-high-level-action-plan/documents/00543359-
pdf/00543359-pdf/govscot%3Adocument
HARSAG2 recommendations tracker, West
Dunbartonshire Council Housing Development and
Homelessness Team, July 2025;
Housing and Communities Committee Report 21st August
2024 “Rapid Rehousing Transition Plan and new
approaches to homeless update”.
West Dunbartonshire Council Housing Emergency Action
Plan, July 2025
Letter from Shirley-Anne Somerville, MSP, Cabinet
Secretary for Social Justice on Distribution of Funding for
Rapid Rehousing Transition Plans for 2025/26; 13 May
2025;
“More than a Roof” West Dunbartonshire Council’s
Homelessness Prevention and Temporary
Accommodation Strategy 2017-2020.
Page 97

Page 98

West Dunbartonshire Council’s Local Housing Strategy
2022-2027;
West Dunbartonshire Council’s Revised Rapid Rehousing
Transition Plan including Action Plan and Equalities Impact
Assessment, Home at the Heart
West Dunbartonshire Council’s Housing Solutions
Strategy, Action Plan and Equalities Impact Assessment,
Housing Solutions Strategy 27.03.25
Wards Affected:             All    
Page 98

Page 99

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief officer Housing 
Housing and Communities Committee: 20th August 2025
______________________________________________________________ 
Subject:       Building Services Procurement Provision update   
1. Purpose 
1.1 The purpose of this report is to advise Committee of completed tender
processes for Building Services. 
1.2 To seek Committee approval to allow award of contract by the Chief
officer of Housing & Employability to the below named successful
bidders. 
2. Recommendations 
2.1 It is recommended that Members: 
i. note the contents of this report. 
ii. approve the contract award to the contractors listed within the
table in section 4.2 of this report; and 
3. Background
3.1  Good progress has been made in letting necessary contracts to ensure
full compliance with Council Standing Orders, Council Financial
Regulations and all Procurement Regulation. 
3.2 Committee Members are requested to refer to these reports which
included information on the services Building Services provides on
behalf of the Council, the need to progress tenders that support the
section’s deliver of a high quality repairs and maintenance service for
the Council’s housing and non-housing properties.        
4. Main Issues
4.1 A detailed tender process has been undertaken and multiple bids
received on all contracts listed. 
4.2 These following contracts will be required to deliver a comprehensive
repairs and maintenance service for a period of up to five years from
the date of let. They will be of sufficient size, scope and duration to
cover the estimated volume of work for the period in question and will
be awarded to suitably qualified and competent suppliers and
contractors. 
ITEM 12
Page 99

Page 100

Requirement  Total
Estimated
Annual
Value
Number of
bids
received 
Preferred
bidder  
 Provision of External
building fabric works (to
include Roofing and Wall
insulation) 
£5.5m  8  Ailsa
Building
contractors
Ltd.
 Provision of Specialist
plumbing services
£0.5m 3 GKL
Plumbing
& Heating
Ltd.
 Joint provision of void
property cleaning services
for housing/homeless 
£0.5m Procurement works
ongoing, no preferred
bidder yet.
 Provision of Television
aerials and ancillary
equipment 
£0.25m 5 MRM
Solutions
LTD. 
4.3 All procurement activity carried out by the Council in excess of £50,000 
is subject to a contract strategy. The procurement route followed for
each of these contracts has been as per the strategy previously noted
to the committee. 
4.4 This procurement exercise has be conducted in accordance with the
Corporate Procurement Unit in close consultation with Building
Services officers and the provisions of Contract Standing Orders, the
Financial Regulations and relevant Public Procurement Regulations. 
5. People Implications 
5.1 Procurement processes are complete, further officer time obligations
are primarily in relation to operating the contract.   
6. Financial Implications
6.1   Costs of the support contracts will be funded by both Capital and
Revenue budgets through the Housing Revenue Account, Central 
Repairs Account and Housing Maintenance Trading Account. 
6.2 Costs of contracts listed under 4.2 are included within existing budgets.     
7. Risk Analysis
7.1 On-going investment, in-line with business plans, will allow the Council
to meet its landlord, health and safety and quality standards obligations
whilst providing appropriate asset management. 
Page 100

Page 101

8. Equalities Impact Assessment (EIA) 
8.1 An Equalities Impact Assessment or screening as appropriate has
been carried out. The report does not propose altering any existing
policy or pattern of service delivery.   
9. Strategic Assessment 
9.1 This report contributes to the Council’s Strategic Priorities and in
particular towards: 
i. improving economic growth and employability. 
ii. improving local housing and environmentally sustainable
infrastructure; and 
iii. improving the wellbeing of communities. 
10. Consultation 
10.1 Finance and Legal have been consulted regarding the set up of the
contracts referred to in this report.     
10.2 The Corporate Procurement team have been consulted in the
development of this report.  They have provided assistance and
professional guidance with the administration of the tender exercises.       
Peter Barry
Chief Officer Housing
Date: 04 August 2025 
______________________________________________________________ 
Persons to Contact: Alistair Norris – Contracts Manager, Building
services; Cochno Street, Clydebank, Telephone:
01389 738200, e-mail: alistair.norris@west-
dunbarton.gov.uk 
Appendices: 1 - DAR External Works  
2 - DAR Plumbing  
3 – DAR Digital Maintenance 
Background Papers: Nil 
Wards Affected: All 
Page 101

Page 102

WEST DUNBARTONSHIRE COUNCIL
Delegated Authority Contract Authorisation Report
___________________________________________________________________
Subject: External Building Fabric Upgrades
1. Purpose
1.1 The purpose of this report is to seek approval to conclude the award of the
contract for the External Building Fabric Upgrades.
2. Recommendations
2.1 It is recommended that, upon this report being signed by the Chief Officer –
Housing and Employability and the Procurement Manager, that the Corporate
Procurement Unit officer will request the Chief Officer - Regulatory and
Regeneration to:
a) Conclude on behalf of West Dunbartonshire Council (the Council), the
award of the contract for External Building Fabric Upgrades to Ailsa
Building Contractors Ltd; and
b) Note that the contract shall be for a period of three years with the
option of two x 12 month extensions and at a value of £6,760,019.19
inclusive of VAT over three years and £11,266,698.66 inclusive of VAT
over five years. The estimated commencement date of the contract is
September 2025.
3. Background
3.1 West Dunbartonshire Council (the Council) is seeking to appoint a suitably
qualified contractor who can deliver the works required for External building
fabric upgrades and because of the nature of the service or the viability of
carrying out the works in house.
3.2 The overall budget for External Building Fabric Upgrades was approved at the
Housing and Communities Committee on 7 May 2025. The budget for this
specific contract is both Capital and Revenue.
3.3 This procurement exercise has been conducted in accordance with the
Council’s Standing Orders and Financial Regulations and the Public
Procurement Regulations.  A Contract Strategy was also approved on 28 May
2025.
4. Main Issues
4.1 The Contract Strategy identified that the best route to market was by
conducting an open procedure which opens the tender to a wider supplier base
than the suppliers listed on a collaborative framework. By using this approach,
it will encourage a larger / wider contractor base to bid for the project. The
service area can also assist with promoting the opportunity locally. This will
increase competition and allow for any local SMEs the opportunity to submit a
tender response.
ITEM 12 -
APPENDIX 1
Page 102

Page 103

4.2 A contract notice was published on the Public Contracts Scotland advertising
portal and the Find a Tender Service on 6 June 2025. Thirty Two potential
bidders expressed an interest, with eight bidders submitting a response by the
deadline on 17 July 2025.
4.3 The eight tender submissions were evaluated by representatives from Housing
and Employability and Corporate Procurement Unit against pre-determined
selection criteria forming part of the published tender documents which
assessed competence, experience, and capacity. Eight tender submissions
passed the selection criteria.
4.4 The tender submissions were evaluated against a set of award criteria which
was based on Price / Quality ratio of 70% / 30%. The scores relative to the
award criteria of each tenderer are as follows:
Weighting A.C. Whyte &
Co Ltd
Ailsa
Building
Contractors
Ltd
Everwarm
Limited
GMG
Contractors
Ltd
Hugh LS
McConnell
Ltd
Quality (30%)
Fit for Purpose (9.747%) 7.310% 4.873% 4.873% 4.873% 4.873%
Programme and
Phasing of Works
(3.753%) 2.814% 1.876% 2.814% 2.814% 2.814%
Specification (3%) 2.25% 1.5% 2.25% 2.25% 2.25%
Contract Service
Delivery Team
Structure Skills
(2.25%) 1.687% 1.125% 1.687% 1.687% 1.687%
Responsiveness
and Lead Time /
On Time Delivery
Against
Objectives
(2.25%) 1.687% 1.687% 1.687% 1.687% 1.687%
Pricing (3.75%) 2.814% 1.875% 2.814% 2.814% 2.814%
Business
Continuity
(2.25%) 1.687% 1.687% 1.687% 1.687% 1.687%
Social Benefits (1.5%) 1.5% 1.5% 1.5% 1.5% 0.75%
Sustainability (0.75%) 0.562% 0.562% 0.562% 0.562% 0.562%
Fair Work First (0.75%) 0.562% 0.562% 0.562% 0.562% 0.562%
Quality Sub-
Total %:
(30%) 22.875% 17.25% 20.438% 20.438% 19.688%
Price (70%)
Page 103

Page 104

Weighting Marley
Contract
Services
MP Group UK
Ltd
Procast
Building
Contractors
Limited
Quality (30%)
Fit for Purpose (9.747%) 4.873% 7.310% 4.873%
Programme and
Phasing of Works
(3.753%) 1.876% 2.814% 2.814%
Specification (3%) 1.5% 2.25% 1.5%
Contract Service
Delivery Team
Structure Skills
(2.25%) 1.687% 1.687% 1.687%
Responsiveness and
Lead Time / On Time
Delivery Against
Objectives
(2.25%) 1.125% 1.687% 1.687%
Pricing (3.75%) 2.814% 2.814% 2.814%
Business Continuity (2.25%) 1.687% 1.687% 1.687%
Social Benefits (1.5%) 0.75% 1.5% 0.75%
Sustainability (0.75%) 0.375% 0.562% 0.562%
Fair Work First (0.75%) 0.562% 0.562% 0.562%
Quality Sub-Total %: (30%) 17.25% 22.875% 18.938%
Price (70%)
Price Sub Total £ - £3,360,868.63 £2,142,430.60 £2,508,844.83
Price Sub Total % (70%) 39.11% 61.353% 52.393%
Total Score 100% 56.36% 84.228% 71.331%
Price Sub Total £ - £2,814.782.6
0
£1,877,783.1
1
£2,635,415
.04
£2,432,852.9
6
£2,715,533
.51
Price Sub Total
%
(70%) 46.698% 70% 49.877% 54.029% 48.405%
Total Score 100% 69.573% 87.25% 70.315% 74.467% 68.093%
Page 104

Page 105

4.5 It is recommended that the contract is awarded to Ailsa Building Contractors
Ltd, of Coatbridge. The contract shall be for a period of three years with the
option of two x 12 month extensions and at a value of £6,760,019.19 inclusive
of VAT over three years and £11,266,698.66 inclusive of VAT over five years.
4.6 Ailsa Building Contractors Ltd has committed to paying all staff as a minimum
the real Living Wage (£12.60 per hour) and promotes Fair Working Practices
across their organisation. Further, Ailsa Building Contractors Ltd has
committed to delivery of the following social benefits as a direct result of
delivery of this contract:
 Recruit member of staff from within the West Dunbartonshire geographical
area who has been identified as a Working4U priority group client;
 Use of West Dunbartonshire based organisations for sub-contracting
opportunities;
 Offer a new registered apprenticeship to a resident of the West
Dunbartonshire geographical area, who is aged 16 - 24, ulitising  WDC's
modern apprenticehip contract for apprenticeship training;
 Offer a new registered apprenticeship to a resident of the West
Dunbartonshire geographical area to a priority Working4U client.
The social benefits will be discussed at the implementation meeting with Ailsa
Building Contractors Ltd and actions to take these forward will be agreed.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Financial costs in respect of this Contract will be met from the approved Capital
and Revenue budget of Housing and Employability.
6.2 The figures in the recommendations have been provided as inclusive of VAT in
line with Scottish Government guidance. As the Council can recover VAT it
may be of interest to note that the prices referred to in Paragraph 2.1(b)
exclusive of VAT will be £5,633,349.33 over three years and £9,388,915.55
over five years.
6.3 This procurement exercise was conducted in accordance with the agreed
Contract Strategy produced by the Corporate Procurement Unit in close
consultation with Regulatory and Regeneration officers and the provisions of
Contract Standing Orders, the Financial Regulations and relevant Public
Procurement Regulation.
7. Risk Analysis
7.1 Ails Building Contractors Ltd has no known links to Serious and Organised
Crime which would have significant political and reputational ramifications for
the Council.
Page 105

Page 106

8. Equalities Impact Assessment (EIA)
8.1 An equalities screening was undertaken which identified that a full assessment
was required.
9. Consultation
9.1 Housing and Employability, Finance Services and Legal Services have been
consulted on the contents of this report.
10. Strategic Assessment
The External Building Fabric Upgrades will contribute to the delivery of the
Council’s strategic priorities:
 Our communities are resilient and thriving.
 Our environment promotes a greener future.
 Our economy is strong and flourishing.
Name:  Michelle McKenzie
Designation:  Senior Procurement Officer
Date:  5 August 2025
Authorisation:
Delegated Authority Chief Officer: Peter Barry
Signature:
Date:
Procurement Manager: Iain Skene
Signature: 
Date: 
Page 106

Page 107

WEST DUNBARTONSHIRE COUNCIL
Delegated Authority Contract Authorisation Report
___________________________________________________________________
Subject: Measured Term Contract for Plumbing
1. Purpose
1.1 The purpose of this report is to seek approval to conclude the award of the
contract for the Measured Term Contract for Plumbing.
2. Recommendations
2.1 It is recommended that, upon this report being signed by the Chief Officer –
Housing and Employability and the Business Partner – Strategic Procurement,
that the CPU officer will request the Chief Officer - Regulatory and
Regeneration to:
a) Conclude on behalf of West Dunbartonshire Council (the Council), the
award of the contract for Measured Term Contract for Plumbing to GKL
Plumbing & Heating Ltd; and
b) Note that the contract shall be for a period of two years with the option of
a two x 12 months extension and at a value of £1,000,000 inclusive of
VAT over two years and £2,000,000 inclusive of VAT should the contract
be extended.  The estimated commencement date of the contract is
September 2025.
3. Background
3.1 West Dunbartonshire Council (the Council) is committed to delivering a high-
quality repairs and maintenance service together with delivering capital
projects, which ensures that all its housing, operational and non-operational
properties are well maintained at a reasonable cost, providing value for money,
are sustainable and are kept in a good and safe state of repair. This also
ensures that the Council are extending the useful life of an asset and increase
the market value of the Council’s assets.
Building Services are the Council’s in-house maintenance provider. They
deliver a wide range of services for local communities and customers from
depots in Clydebank and Dumbarton providing a dedicated repairs and
maintenance service employing in the region of 350 staff which is customer
focused through a range of professional, technical and front-line services
3.2 The overall budget for Measured Term Contract for Plumbing was approved at
the Housing and Communities Committee on 7 May 2025. The period of budget
was for four years.
3.3 This procurement exercise has been conducted in accordance with the
Council’s Standing Orders and Financial Regulations and the Public
ITEM 12 -
APPENDIX 2
Page 107

Page 108

Procurement Regulations.  A Contract Strategy document was also approved
on 16 June 2025.
4. Main Issues
4.1 The Council’s recommended route would be to conduct an open procedure
which will ensure an open and transparent method of identifying suitably
competent and qualified contractors.  This route of procurement requires a
contract notice to published for a minimum of 30 days inviting competing
contractors that can provide the works within the timescales required. The
robust Single Procurement Document the selection criteria as published will set
out the minimum standards and criteria which must be evidenced.  Each
contractor must confirm that they meet the Council’s minimum requirements in
relation to the Selection criteria.  This compliant procurement route and
ensuring value for money and a mechanism for controlling rates within the
contracts. By adopting the above approach, this will allow the Council to select
contractors who have a highly experience skill set and offer a collaborative
working relationship with common goals.  The Council would pro-actively target
local SMEs using trade directories, local knowledge and by using social media
channels and reaching out to suppliers on Scotland Excel Frameworks to
advise them of our upcoming tender.
4.2 A contract notice was published on the Public Contracts Scotland advertising
portal and the Find a Tender Service on 19 June 2025. 19 potential bidders
expressed an interest, with three bidders submitting a response by the deadline
on 21 July 2025.
4.3 The three tender submissions were evaluated by representatives from Building
Services, Corporate Procurement Unit and Asset Management against pre-
determined selection criteria forming part of the published tender documents
which assessed competence, experience, and capacity. Three tender
submissions passed the selection criteria.
4.4 Three tender submissions were evaluated against a set of award criteria which
was based on Price / Quality ratio of 60% / 40%. The scores relative to the
award criteria of each tenderer are as follows:
Weighting GKL
Plumbing &
Heating Ltd
Valley
Group
John
Docherty &
co Ltd
Quality (40%)
Fit for Purpose (13%) 9.75% 9.75% 9.75%
Programme and
Phasing of Works
(5%) 2.5% 3.75% 3.75%
Specification (4%) 3% 3% 3%
Page 108

Page 109

Contract Service
Delivery Team
Structure Skills
(3%) 2.25% 2.25% 2.25%
Responsiveness and
Lead Time / On Time
Delivery Against
Objectives
(3%) 2.25% 2.25% 2.25%
Pricing (5%) 3.75% 3.75% 3.75%
Business Continuity (3%) 2.25% 2.25% 2.25%
Social Benefits (2%) 2% 1% 2%
Sustainability (1%) 0.75% 0.75% 0.75%
Fair Work First (1%) 0.5% 0.75% 0.75%
Quality Sub-Total %: (40%) 29% 29.5% 30.5%
Price (60%)
Price Sub Total £ - £ 74,607.90 £ 77,796.04 £ 93,514.67
Price Sub Total % (60%) 60% 57.54% 47.869%
Total Score 100% 89% 87.04% 78.369%
4.5 It is recommended that the contract is awarded to GKL Plumbing & Heating
Ltd, of Paisley, who has provided the most economically advantageous tender.
The contract shall be for a period of two years with the option of a two x 12
month extension and at a value of £1,000,000 inclusive of VAT over two years
and £2,000,000 inclusive VAT should the contract be extended.
4.6 GKL Plumbing & Heating Ltd has committed to paying all staff as a minimum
the real Living Wage (£12.60 per hour) and promotes Fair Working Practices
across their organisation. Further, GKL Plumbing & Heating Ltd has committed
to delivery of the following social benefits as a direct result of delivery of this
contract:
 All vacancies related to this contract to be advertised and recruited for
through the Working4U Employer Engagement Recruitment Service.
 Use of West Dunbartonshire based organisations for sub-contracting
opportunities;
 Deliver quarterly workshops, covering career skills, mock interviews etc.,
within a school or community learning environment;
Page 109

Page 110

 Facilitate quarterly work experience opportunities covering a range of
work based skills;
 Support for local small and medium sized enterprises as part of this
contract;
 Support for local Third Sector organisation(s) as part of this contract;
 Support for local Supported Businesses as part of this contract;
 Support for local community benefits as part of this contract;
 Support Climate Hero's initiative in partnership with Developing the Young
Workforce- West Region and Education.
 Attend employment fair to encourage local employment with West
Dunbartonshire
 Donation of goods to local food-share scheme.
 Donation of money to a community group or charity that supports health
and wellbeing within the community.
 Donations of materials to support a local community project.
 Donation of labour to support a local community project.
 Provision of volunteers to support a local community project.
 Donation of money to support a local community project
 Sponsorship of a local sports or community team.
 Deliver quarterly mentoring sessions to West Dunbartonshire residents to
remove barriers to work of those most likely to reoffend. Need to add work
experience
 Supporting environmental educational projects in schools such as tree or
woodland planting or educational packs.
 Community operated transport which helps reduce CO2 emissions or
carbon footprint.
 Supporting the reduction of non-recyclable materials throughout the West
Dunbartonshire area.
The social benefits will be discussed at the implementation meeting with GKL
Plumbing & Heating Ltd and actions to take these forward will be agreed.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Financial costs in respect of this Contract will be met from the approved Capital
/ Revenue budget of Building Services and Asset Management.
6.2 This procurement exercise was conducted in accordance with the agreed
Contract Strategy produced by the Corporate Procurement Unit in close
consultation with Building Services and Asset Management officers and the
provisions of Contract Standing Orders, the Financial Regulations and relevant
Public Procurement Regulation.
7. Risk Analysis
Page 110

Page 111

7.1 GKL Plumbing & Heating Ltd has no known links to Serious and Organised
Crime which would have significant political and reputational ramifications for
the Council.
8. Equalities Impact Assessment (EIA)
8.1 An equalities screening was undertaken for this reports to determine if there is
an equalities impact. The results where there was no equalities impact.
9. Consultation
9.1 Building Services and Asset Management have been consulted on the contents
of this report.
10. Strategic Assessment
12.1 The Measured Term Contract for Plumbing will contribute to the delivery of the
Council’s strategic priorities:
 Our communities are resilient and thriving;
 Our environment promotes a greener future;
 Our economy is strong and flourishing
Name: Ellie Street
Designation: Procurement Officer
Date: 05/08/2025
Authorisation:
Delegated Authority Chief Officer: Housing and Employability
Name: Peter Barry
Signature:
Date:
Procurement Manager: Iain Skene
Signature: 
Date: 
Page 111

Page 112

WEST DUNBARTONSHIRE COUNCIL
Delegated Authority Contract Authorisation Report
___________________________________________________________________
Subject: Provision of Digital TV Maintenance Services
1. Purpose
1.1 The purpose of this report is to seek approval to conclude the award of the
contract for the Provision of Digital TV Maintenance Services.
2. Recommendations
2.1 It is recommended that, upon this report being signed by the Chief Officer –
Housing and Employability and the Business Partner – Strategic Procurement,
that the CPU officer will request the Chief Officer - Regulatory and
Regeneration to:
a) Conclude on behalf of West Dunbartonshire Council (the Council), the
award of the contract for Provision of Digital TV Maintenance Services to
MRM Electrical Solutions Ltd; and
b) Note that the contract shall be for a period of two years with the option of
a two x 12 months extension and at a value of £500,000 inclusive of VAT
over two years and £1,000,000 inclusive of VAT should the contract be
extended.  The estimated commencement date of the contract is August
2025.
3. Background
3.1 West Dunbartonshire Council (the Council) is committed to delivering a high-
quality repairs and maintenance service together with delivering capital
projects, which ensures that all its housing, operational and non-operational
properties are well maintained at a reasonable cost, providing value for money,
are sustainable and are kept in a good and safe state of repair. This also
ensures that the Council are extending the useful life of an asset and increase
the market value of the Council’s assets.
3.2 The overall budget for Provision of Digital TV Maintenance Services was
approved at the Housing and Communities Committee on 7 May 2025. The
period of budget was for four years. The budget for this specific contract which
is General Revenue budget, was approved by the [Home Committee] on 7 May
2025.
3.3 This procurement exercise has been conducted in accordance with the
Council’s Standing Orders and Financial Regulations and the Public
Procurement Regulations.  A Contract Strategy document was also approved
on 28 May 2025.
4. Main Issues
4.1 The recommended route to market was to have an open tender as there were
currently no framework options available that fully cover off the Council
ITEM 12 -
APPENDIX 3
Page 112

Page 113

specification for this requirement. The open procedure allowed market
exposure to multiple bidders and ensures all qualified suppliers have a chance
to bid, driving competition and pricing to a better value. Advantageous to small
and medium-sized enterprises (SME) providers on financial assessment and
capacity reasons.  The service area will also support with promoting the tender
opportunity to any known bidders who can fully service the needs of the
Council.
4.2 A contract notice was published on the Public Contracts Scotland advertising
portal and the Find a Tender Service on 29 May 2025. Four potential bidders
expressed an interest, with Four bidders submitting a response by the deadline
on 30 June 2025.
4.3 The four tender submissions were evaluated by representatives from Building
Services and Corporate Procurement Unit against pre-determined selection
criteria forming part of the published tender documents which assessed
competence, experience, and capacity. Four tender submissions passed the
selection criteria.
4.4 Four tender submissions were evaluated against a set of award criteria which
was based on Price / Quality ratio of 70% / 30%. The scores relative to the
award criteria of each tenderer are as follows:
Weighting MRM
Electrical
Solutions
Ltd
Robertson
Acom Ltd
Campbell &
Kennedy
Maintenance
Ltd
Alphacomm
Systems
Ltd
Quality (30%)
Contract Service
delivery team –
Structure
(1.125%) 0.844% 0.844% 0.844% 0.844%
Contract Service
Delivery Team - Skills
(2.25%) 1.687% 1.687% 1.125% 1.125%
Contract Service
Delivery Team -
Allocation
(1.125%) 0.843% 0.562% 0.562% 0.281%
Emergency
Response
(3%) 2.25% 2.25% 1.5% 1.5%
Tenant Liaison &
Service
(2.4%) 1.8% 1.8% 1.2% 1.8%
Re-Phasing of
Works
(1.8%) 0.9% 1.35% 0.45% 0.9%
Challenges, Issues
and Risks
(1.2%) 0.3% 0.6% 0.9% 0.9%
Receiving Orders (1.2%) 0.6% 0.6% 0.6% 0.6%
Escalation process (1.2%) 0.6% 0.9% 0.9% 0.6%
Page 113

Page 114

Customer Liaison &
Service
(1.2%) 0.9% 0.6% 0.6% 0.6%
Contract
Communication
(3.75%) 1.875% 1.875% 1.875% 1.875%
Contract Monitoring (3.75%) 1.875% 2.812% 1.875% 1.875%
Business Continuity -
Communication
(1.5%) 0.75% 1.125% 1.125% 0.75%
Sustainability (1.5%) 0.75% 1.125% 0.375% 0.375%
Fair Work First (1.5%) 1.125% 0.75% 1.125% 1.125%
Social Benefits (1.5%) 0% 0.75% 0.75% 0%
Quality Sub-Total %: (30%) 17.1% 19.63% 15.806% 15.15%
Price (70%)
Price Sub Total £ - £43,665 £70,063 £68,355.40 £73,295
Price Sub Total % (70%) 70% 43.62% 44.728% 41.70%
Total Score 100% 87.1% 63.25% 60.535% 56.85%
4.5 It is recommended that the contract is awarded to MRM Electrical Solutions
Ltd, of Newcastle Upon Tyne, who has provided the most economically
advantageous tender.  The contract shall be for a period of two years with the
option of a two x 12 months extension and at a value of £1,000,000 inclusive of
VAT over two years and £1,000,000 inclusive VAT should the contract be
extended.
4.6 For noting MRM undertook not to charge the Council for scaffolding works and
cited that they had just invested in a tower scaffold and relevant qualifications
to operate it themselves. It’s possible they can cover that work in their
overheads. Other than that they costs were in a very narrow band.
4.7 MRM Electrical Solutions Ltd has committed to paying all staff as a minimum
the real Living Wage (£12.60 per hour) and promotes Fair Working Practices
across their organisation.
The social benefits will be discussed at the implementation meeting with MRM
Electrical Solutions Ltd and actions to take these forward will be agreed.
5. People Implications
5.1 There are no people implications.
Page 114

Page 115

6. Financial and Procurement Implications
6.1 Financial costs in respect of this Contract will be met from the approved
General Revenue budget of Building Services.
6.2 This procurement exercise was conducted in accordance with the agreed
Contract Strategy produced by the Corporate Procurement Unit in close
consultation with Building Services officers and the provisions of Contract
Standing Orders, the Financial Regulations and relevant Public Procurement
Regulation.
7. Risk Analysis
7.1 MRM Electrical Solutions Ltd has no known links to Serious and Organised
Crime which would have significant political and reputational ramifications for
the Council.
8. Equalities Impact Assessment (EIA)
8.1 An equalities screening was undertaken for this reports to determine if there is
an equalities impact. The results where: there were no equalities impacted.
9. Consultation
9.1 Building Services, Finance Services and Legal Services have been consulted
on the contents of this report.
10. Strategic Assessment
12.1 The Provision of Digital TV Maintenance Services will contribute to the delivery
of the Council’s strategic priorities:
 Our communities are resilient and thriving;
 Our environment promotes a greener future;
 Our economy is strong and flourishing
Name: Ellie Street
Designation: Procurement Officer
Date: 05/08/2025
Authorisation:
Delegated Authority Chief Officer: Housing and Employability
Name: Peter Barry
Signature:
Date:
Procurement Manager: Iain Skene
Signature: 
Date:  5/8/25
Page 115

Page 116

Page 116

Page 117

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources 
Housing and Communities Committee: 20 August 2025
___________________________________________________________________
Subject: Housing Revenue Account (HRA) Capital 
Budgetary Control Report to 30 June 25 (Period 3)
1. Purpose
1.1 This report provides an update on the HRA capital programme to 30 June
2025.
2. Recommendations
2.1 Members are asked to:
i) note the current position of the 2025/26 HRA capital estimates and the
HRA capital plan.
ii) note that in year financial performance will be monitored against a
2025/26 capital expenditure estimate of £55.547m and a 2025/26
capital income estimate of £6.290m, a forecast borrowing requirement
of £49.257m.
iii) note that project life performance will be monitored against a project life
expenditure estimate of £345.311m and a project life income estimate
of £80.378m, a five-year borrowing requirement of £264.933m.
iv) note that at this early stage all projects are on track regarding achieving
their planned completion dates and delivering within the updated
capital estimate.
3. Background
3.1 The Council approved the HRA Capital Plan for 2025/2026 to 2029/2030 on 5
March 2025. The HRA capital plan estimated £70.590m of capital expenditure
and £15.324m of capital income in 25/26, a forecast borrowing requirement of
£55.266m.
3.2 Since then, budget adjustments have taken place to reflect up to date
information on progress delivering the plan and any need for budget
acceleration and budget deceleration from / to future years, and to update the
expenditure and income budgets for Affordable Housing Supply projects to
reflect the 2024/2025 outturn and to reflect that the most recent cost and
income forecasts.  The budget adjustments result in revised capital budgets
as set out in Exhibit 1. The updated borrowing requirement for 25/26 of
£49.257m is £6.009m less than the estimate that Council agreed in March
2025. 
ITEM 13
Page 117

Page 118

Exhibit 1: Revised HRA Capital Estimates 2025/2026 – 2029/2030
2025/26
BCR03
(£m)
Project Life
BCR03
(£m)
2025/26
March 25
(£m)
Project Life
March 25
(£m)
Other Capital Expenditure 7.433 26.267 7.433 26.267
Component Replacement 20.881 93.567 20.881 93.567
Void Capital 5.258 19.873 5.258 19.873
Structural & Environmental 3.762 17.320 3.762 17.320
Support Costs 3.100 17.155 3.100 17.155
More Homes Programme  15.113 171.129 30.156 166.469
Total Expenditure 55.547 345.311 70.590 340.651
Total Income -6.290 -80.379 -15.324 -73.009
Prudential Borrowing 49.257 264.932 55.266 267.642
4. Main Issues
4.1 Progress against the 2025/26 capital plan is detailed in:
Appendix 1 – HRA Capital Summary BCR03
Appendix 2 – HRA Capital Detail BCR03
4.2 The HRA capital summary report at Appendix 1 reports that planned
expenditure and planned income are both in line with the overall project
estimates. Appendix 1 reports that there are fifteen capital projects where
expenditure is tracked over the multi-year life of the project and twenty-nine
projects classified as rolling programme projects / contingency / fees, that is
programmes of work where an annual estimate is set each year that takes
account of demand, cost, and affordability.
4.3 Appendix 2 shows all projects with approved in year and project life estimates
as well as forecast expenditure / income. The appendix highlights a
2025/2026 expenditure budget of £55.447m and a forecast spend of
£55.447m. The 2025/2026 capital income budget is £6.290m, with a forecast
income of £6.290m.
4.5 Budget assumptions are required to forecast costs / income, especially where
projects span multi-year and project finances have yet to be finalised. It is
therefore likely that the projected year end position will change during the
year.
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications.
7. Financial and Procurement Implications
7.1 The report notes the projected in-year financial position for capital estimates. 
Page 118

Page 119

8. Risk Analysis
8.1 The main risks are as follows:
(a) The reported variances should be viewed in the knowledge that there are
several variable factors which could arise between now and 31 March
which could affect the year end results for capital budgets.
(b) To forecast for the full year costs budget assumptions have been
required. These assumptions continue to change regularly and therefore
it is likely the projected year end position will change from that reported.
9. Equalities Impact Assessment (EIA)
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 All services involved in delivering the capital estimates have been consulted
during the compilation of this report.
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council.
________________
Laurence Slavin
Chief Officer – Resources
Date: 20 August 2025
Person to Contact: Jim McCarron
Business Partner, Finance 07772 322055
E-mail: james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - HRA Capital Summary BCR03
Appendix 2- HRA Capital Details BCR03
Background Papers:
Housing Revenue Account (HRA) Capital Investment Programme, Revenue
Budget, and Rent Levels for 2025/26 - Council 5 March 2025.
Wards Affected           All Wards
Page 119

Page 120

Period 3 - 30 June 25
Summary
HRA Capital Expenditure Project Life
Budget
Project Life
Forecast Spend
Project Life
Variance
Rolling
Programmes
Projects Projects
On Track / Complete
Projects
Off Track
£000 £000 £000
Other Capital Expenditure 26,267                26,267                -                      8                    -                -                              -                             
Major Component Replacement 93,567                93,567                -                      10                  -                -                              -                             
Void Capital 19,873                19,873                -                      1                    -                -                              -                             
Structural & Environmental 17,320                17,320                -                      4                    -                -                              -                             
Support Costs 17,155                17,155                -                      1                    -                -                              -                             
Affordable Housing Supply Programme 171,129              171,129              -                      5                    15                  15                                -                             
Total Expenditure 345,311              345,311              -                      29                  15                  15                                -                             
Total Income (80,378) (80,378) -                      -                              -                             
Total 264,933 264,933              -                     
ITEM 13 - APPENDIX 1
Page 120

Page 121

All Approved HRA Capital Projects at Period 03  _  30 June 25 
Project Category Planned
End Date
Revised
End Date
Project Life
Budget
Expenditure
to 31/3/25
Expenditure
to Date
Projected
Future Spend
Project Life
Forecast Spend
Project
Variance
Updated
Budget
2025/26
Expenditure
to Date
2025/26
Projected
Spend
2025/26
In Year
Variance
2025/26
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
OCE1 Special Needs Adaptations Rolling 31/03/2030 3,661                    -                             197                        3,464                    3,661                    -                             668                        197                        668                        -                       
OCE2 Capitalised Minor Works Rolling 31/03/2030 12,623                  -                             681                        11,942                  12,623                  -                             3,715                    681                        3,715                    -                       
OCE3 Better Homes Priority Budget Rolling 31/03/2030 1,175                    -                             6                            1,169                    1,175                    -                             275                        6                            275                        -                       
OCE4 Environmental Sensors Programme Rolling 31/03/2030 7,897                    -                             226                        7,671                    7,897                    -                             2,000                    226                        2,000                    -                       
OCE5 Housing CCTV Installation Programme Rolling 31/03/2030 750                        -                             287                        463                        750                        -                             750                        287                        750                        -                       
OCE6 QL Development Rolling 31/03/2030 50                          -                             -                             50                          50                          -                             10                          -                             10                          -                       
OCE7 Gypsy Travellers Site Rolling 31/03/2030 15                          -                             -                             15                          15                          -                             15                          -                             15                          -                       
OCE8 Airport Noise Rolling 31/03/2027 96                          -                             -                             96                          96                          -                             -                             -                             -                             -                       
Other Capital Expenditure 26,267                  -                        1,397                    24,870                  26,267                  -                        7,433                    1,397                    7,433                    0
MCR1 Targeted SHQS /EESSH compliance works Rolling 31/03/2030 30,163                  -                             782                        29,381                  30,163                                             -   6,628                    782                        6,628                    -                       
MCR2 External Component Renewal - Roofs Rolling 31/03/2030 13,204                  -                             367                        12,837                  13,204                                             -   2,550                    367                        2,550                    -                       
MCR3 Doors/Windows Component Renewals Rolling 31/03/2030 23,190                  -                             1,029                    22,161                  23,190                                             -   4,985                    1,029                    4,985                    -                       
MCR4 External Stores / Garages / Bin Stores Rolling 31/03/2030 247                        -                             -                             247                        247                                                   -   48                          -                             48                          -                       
MCR5 Secure entry component renewals Rolling 31/03/2030 500                        -                             -                             500                        500                                                   -   100                        -                             100                        -                       
MCR6 Statutory / Regulatory Compliance Works Rolling 31/03/2030 1,106                    -                             -                             1,106                    1,106                                               -   594                        -                             594                        -                       
MCR7 Heating Improvement Works Rolling 31/03/2030 11,771                  -                             418                        11,353                  11,771                                             -   2,268                    418                        2,268                    -                       
MCR8 Energy Improvements / Energy Efficiency Works Rolling 31/03/2030 297                        -                             -                             297                        297                                                   -   58                          -                             58                          -                       
MCR9 Kitchen Upgrade Rolling 31/03/2030 10,089                  -                             391                        9,698                    10,089                                             -   2,850                    391                        2,850                    -                       
MCR10 Bathroom & Shower Replacement Rolling 31/03/2030 3,000                    -                             160                        2,840                    3,000                                               -   800                        160                        800                        -                       
Major Component Replacement 93,567                  -                        3,147                    90,420                  93,567                  -                        20,881                  3,147                    20,881                  -                            
VOC1 Void House Strategy Programme Rolling 31/03/2030 19,873                  -                             1,251                    18,622                  19,873                                             -   5,258                    1,251                    5,258                    -                       
Void Capital 19,873                  -                        1,251                    18,622                  19,873                  -                        5,258                    1,251                    5,258                    0
STE1 Defective structures/component renewals Rolling 31/03/2030 4,389                                                 - 245                        4,144                    4,389                                                 - 800                        245                        800                        -                       
STE2 Environmental Renewal - Paths & Environment Rolling 31/03/2030 5,436                                                 - 290                        5,146                    5,436                                                 - 1,000                    290                        1,000                    -                       
STE3 Asbestos Management Works Rolling 31/03/2030 1,239                                                 - -                             1,239                    1,239                                                 - 242                        -                             242                        -                       
STE4 Multi Storey Flat Strategy Rolling 31/03/2030 6,256                    -                             2                            6,254                    6,256                                                 - 1,720                    2                            1,720                    -                       
Structural & Environmental 17,320                  -                             537                        16,783                  17,320                  -                        3,762                    537                        3,762                    0
SUP1 Salaries / Central Support / Overhead Rolling 31/03/2030 17,155                  -                             775                        16,380                                     17,155                            -   3,100                    775                        3,100                    -                       
Support Costs 17,155                  -                        775                        16,380                  17,155                  -                        3,100                    775                        3,100                    0
AHP1 Buy Backs Rolling 31/03/2030 21,387                  -                             209                        21,178                                     21,387                            -   4,380                    209                        4,380                    -                       
AHP2 Demolition Programme Rolling 31/03/2029 1,140                    -                             138                        1,002                                         1,140                            -   140                        138                        140                        -                       
AHP3 Contingency Rolling 31/03/2030 530                        -                             -                             530                                                530                            -   102                        -                             102                        -                       
AHP4 Clydebank East Project 30/04/2025 33,643                  32,953                  33,080                  563                                           33,643                            -   250                        127                        250                        -                       
AHP5 Mount Pleasant Project 30/04/2025 5,357                    4,900                    5,282                    75                                               5,357                            -   382                        382                        382                        -                       
AHP6 Pappert Project 30/06/2025 9,034                    8,169                    8,897                    137                                             9,034                            -   730                        728                        730                        -                       
AHP7 7-9 Gilmour Avenue Project 30/09/2025 733                        459                        461                        272                                                733                            -   264                        2                            264                        -                       
AHP8 Willox Park Phase1 Project 31/12/2025 5,531                    1,951                    2,565                    2,966                                         5,531                            -   2,980                    614                        2,980                    -                       
AHP9 Bonhill Gap Sites Project 30/09/2026 9,521                    241                        241                        9,280                                         9,521                            -   1,600                    -                             1,600                    -                       
AHP10 Queen Mary Avenue Project 31/12/2026 4,540                    40                          134                        4,406                                         4,540                            -   800                        94                          800                        -                       
AHP11 Bank Street Project 31/12/2026 5,797                    297                        350                        5,447                                         5,797                            -   1,500                    53                          1,500                    -                       
AHP12 Silverton Project 31/03/2027 2,889                    29                          29                          2,860                                         2,889                            -   100                        -                             100                        -                       
AHP13 28 Bridge Street Project 31/03/2027 810                        -                             -                             810                                                810                            -   60                          -                             60                          -                       
AHP14 Willox Park Phase2 Project 30/06/2027 5,355                    -                             -                             5,355                                         5,355                            -   100                        -                             100                        -                       
AHP15 Ottawa Crescent Project 30/06/2027 6,000                    -                             -                             6,000                                         6,000                            -   250                        -                             250                        -                       
AHP16 Dennystoun Forge – New Build Project 30/09/2027 4,129                    59                          59                          4,070                                         4,129                            -   400                        -                             400                        -                       
AHP17 Clydebank Health Centre Project 31/12/2027 15,642                  1,017                    1,060                    14,582                                     15,642                            -   375                        43                          375                        -                       
AHP18 Queens Quay Site C Project 31/03/2030 7,231                    31                          31                          7,200                                         7,231                            -   -                             -                             -                             -                       
AHP19 Future New Build & Related Regeneration Projects Rolling 31/03/2030 31,030                  -                             -                             31,030                                     31,030                            -   550                        -                             550                        -                       
AHP20 Fees, Staffing Costs, contingency Rolling 31/03/2030 830                        -                             -                             830                                                830                            -   150                        -                             150                        -                       
Affordable Housing Supply Programme 171,129                50,146                  52,536                  118,593                171,129                -                        15,113                  2,390                    15,113                  0
Total Expenditure 345,311                50,146                  59,643                  285,668                345,311                -                        55,547                  9,497                    55,547                  0
Full Project Life
ITEM 13 - APPENDIX 2
Page 121

Page 122

All Approved HRA Capital Projects at Period 03  _  30 June 25 Appendix 2
Full Project Life
Project Category Planned
End Date
Revised
End Date
Project Life
Budget
Income
to 31/3/25
Income
to Date
Projected
Future Income
Project Life
Forecast Income
Project
Variance
Updated
Budget
2025/26
Income
to Date
2025/26
Projected
Income
2025/26
In Year
Variance
2025/26
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
CAPI1 Scottish Govt Buyback Grant Rolling 31/03/2030 (10,550) -                             -                             (10,550) (10,550) -                             (550) -                             (550) -                            
CAPI2 Clydebank East Project 30/04/2025 (12,605) (12,605) (12,605) 0 (12,605) -                             -                             -                             -                             -                            
CAPI3 Mount Pleasant Project 30/04/2025 (1,838) (1,838) (1,838) -                             (1,838) -                             -                             -                             -                             -                            
CAPI4 Pappert Site Project 30/06/2025 (3,725) (3,475) (3,475) (250) (3,725) -                             (250) -                             250-                        -                            
CAPI5 7-9 Gilmour Avenue Project 30/09/2025 (311) (191) (191) (120) (311) -                             (120) -                             (120) -                            
CAPI6 Willox Park Phase1 Project 31/12/2025 (1,644) (1,644) (1,644) -                             (1,644) -                             -                             -                             -                             -                            
CAPI7 Bonhill Gap Sites Project 30/09/2026 (3,748) (378) (378) (3,370) (3,748) -                             (1,600) -                             (1,600) -                            
CAPI9 Queen Mary Avenue Project 31/12/2026 (2,040) (140) (140) (1,900) (2,040) -                             -                             -                             -                             -                            
CAPI8 Bank Street Project 31/12/2026 (2,220) (258) (258) (1,962) (2,220) -                             (1,500) -                             (1,500) -                            
CAPI10 Silverton Project 31/03/2027 (1,080) -                             -                             (1,080) 1,080-                    -                             -                             -                             -                             -                            
CAPI11 Dennystoun Forge – New Build Project 30/09/2027 (2,400) -                             -                             (2,400) (2,400) -                             -                             -                             -                             -                            
CAPI12 Clydebank Health Centre Project 31/12/2027 (4,781) (966) (966) (3,815) (4,781) -                             (375) -                             (375) -                            
CAPI13 Queens Quay Site C Project 31/03/2030 (4,814) (2,086) (2,014) (2,800) (4,814) -                             72                          72                          72                          -                            
CAPI14 Future new build sites & related regeneration projects Rolling 31/03/2030 (24,711) -                             -                             (24,711) (24,711) -                             (60) -                             (60) -                            
CAPI15 Owners Recoveries Rolling 31/03/2030 (3,500) -                             (1,000) (2,500) (3,500) -                             (1,500) (1,000) (1,500)
CAPI16 Other Grant Rolling 31/03/2030 (406) -                             (405) (1) (406) -                             (406) (405) (406)
CAPI17 HRA Loan Repayments Rolling 31/03/2030 (5) -                             -                             (5) (5) -                             (1) -                             (1) -                            
Total Income (80,378) (23,581) (24,914) (55,464) (80,378) -                             (6,290) (1,333) (6,290) -                            
Prudential Borrowing Requirement 264,933                26,565                  34,729                  230,204                264,933                -                             49,257                  8,164                    49,257                  0
Full Project Life In Year
Page 122

Page 123

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources 
Housing and Communities Committee: 20 August 2025
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 30 June 2025 (Period 03)
1. Purpose
1.1 The purpose of this report is to advise Committee on the 2025/2026 HRA
revenue budget position on 30 June 2025 and the forecast position for HRA
reserves on 31 March 2026.
2. Recommendations
2.1 Members are asked to:
i. note the HRA revenue account is forecasting a deficit of £0.282m. If required,
HRA reserves will be used to fund the adverse variance.
ii. note that the forecast deficit would reduce HRA reserves to £0.329m on 31
March 2026.
iii. note that forecast HRA revenue reserves are less than the HRA revenue
prudential target for 31 March 2026 of £1.160m.
iv. note that work will continue to explore opportunities to remove the in-year
deficit and to rebuild reserves, including the targeting of efficiencies across
all areas of the HRA revenue account budget.
3. Background
Revenue
3.1 The Council approved a 2025/2026 HRA revenue budget of £58.105m on the
5th of March 2025. A prudential reserve target of £1.16m was also set (2% of
the revenue budget). HRA prudential reserves were £0.611m on 31st March
2025.
4. Main Issues
4.1 This report advises committee of the key issues contributing to the Housing
Revenue Account (HRA) forecasting a 2025/26 deficit of £0.282m. The
forecast deficit would require a call on HRA reserves and leave forecast HRA
reserves of £0.329m on 31 March 2026. Using existing reserves to address
the funding deficit adds risk to the wider financial position of the HRA with
reduced capacity to absorb any unforeseen future costs until the HRA rebuilds
its reserves.
ITEM 14
Page 123

Page 124

4.2 There are a range of unfavourable / favourable variance contributing to the
forecast deficit and the main variances are detailed below.
Adverse Variances > £50,000
Employee Costs - £0.257m Adverse
4.3 The main employee cost pressures relate to employers’ national insurance
contribution costs and a higher than budgeted pay settlement for 2025/26.
4.4 The HRA did not budget for the increase in employers’ national insurance
costs in 2025/2026. When the decision was made not to provide for additional
national insurance costs in the HRA estimates, it assumed that the Scottish
Government would provide the council with additional financial grant that
would allow the council to compensate the HRA for this cost burden. However,
the council did not receive full Scottish Government funding for the additional
employer national insurance costs. Employer national insurance costs are
forecast to be £170,000 more than estimate.
4.5 The HRA estimates assume a 3% pay award for 2025/26. On the 13th of June
2025, COSLA wrote to trade unions with a two-year pay offer, a 4% increase
in 2025/25 and a 3.5% increase in 2026/27. The forecast is based on a 4%
pay award with the higher award creating an £80,000 HRA cost pressure.
Repair and Maintenance - £0.044m Adverse 
4.6 The HRA repair and maintenance budget of £13.081m is forecasting a slight
overspend against budget. There continues to a high responsive repair
demand service delivery costs forecast to be circa £890,000 more than
budget. A range of mitigations are in place to address the cost pressure,
including tighter controls on contractor use, the capitalisation of EICR spend
that complements the environmental sensor programme, and close working
with Greenspace colleagues to deliver a minimum £0.150m saving against
environmental budgets by revising work specifications and streamlining
processes.
Bad Debt Provision - £0.150m Adverse 
4.7 The HRA needs to make prudent financial provision for uncollected income
across a range of HRA debts, including rent arrears, rechargeable repairs,
factoring services, capital works.
4.8 HRA income levels have increased over the past few years because of council
house rent increases, the more stringent application of the rechargeable
repairs policy for repairs caused by tenant neglect / abuse, and the increased
amounts invoiced to owners residing within former HRA properties (factoring /
common repairs / capital works).
Page 124

Page 125

4.9 Performance recovering this debt and outstanding debt levels is kept under
constant review. Debt levels have increased alongside the increase in the
amount billed to tenants / owners. The forecast adverse variance assumes an
increase in the bad debt provision to take account of the increased debt.
Void Loss / Council Tax - £0.269m Adverse 
4.10 Council tax payments for longer term void houses are forecast to reduce by
£60,000 in 2025/26 compared to 2024/25 as more longer-term voids are let,
however forecast council tax payments for 2025/26 are £150,000 compared to
a target of £50,000. As previously advised, the main factor behind HRA
properties incurring a council tax liability are delays resolving issues with debt
on meters and with meter reconnections with the poor performance of the
utility companies adversely impacting on the length of time properties are void
and leading to more empty properties incurring a council tax liability. Officers
have made progress and continue to work with utility companies to drive
sustainable improvement in this challenging area and to minimise the number
of longer-term voids and the attendant council tax liability.
4.11 Regarding void losses, there has been considerable progress in reducing void
numbers and void rent loss. The void rent loss is forecast to reduce by
£150,000 in 2025/26 compared to 2024/25 as void numbers reduce, however
forecast void loss for 2025/26 is £850,000 compared to a target of £700,000.
Reducing the void loss remains an operational priority area and the Council’s
Void Working Group and Building Services Improvement Plan will support
further improvement in this key area.
Favourable Variance > £50,000
Loan Charges - £0.585m Favourable.
4.12 The favourable variance is attributable to forecast HRA capital debt repayment
and HRA interest payments being less than the amount budgeted for within
the HRA revenue estimates. The 2025/26 HRA loan charge estimates were
based on HRA capital debt of £356m on 31 March 2025. However, lower HRA
capital borrowing in 2024/25 across the More Home (new build) capital
programme led to HRA debt being £348m on 31 March 2025, £8m less than
anticipated. The lower debt level will attract lower debt servicing costs.
4.13 Members will be aware of the significant risk and uncertainty around
forecasting local authority borrowing costs. The HRA has paid a much higher
interest rate on its outstanding capital debt over the last two years because of
the sharp increase in the interest rates payable on new temporary and new
Public Work Loans Board (PWLB) borrowing. The favourable variance of
£585,000 is predicated on reduced local authority borrowing costs during the
current financial year. There is a risk that HRA debt interest payments are
more than forecast.
5. People Implications
5.1 There are no people implications.
Page 125

Page 126

6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year. This can
affect all service areas.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 All services involved in delivering the HRA revenue budget have been
consulted during the compilation of this report.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer – Resources
Date: 20 August 2025
___________________________________________________________________
Person to Contact: Jim McCarron - Business Unit Finance Partner    
Telephone: 07772 322055
e-mail james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue)
Background Papers: None
Wards Affected: All
Page 126

Page 127

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2025/26
PERIOD END DATE
Budget
2025/26
Spend to Date
2025/26
Forecast Spend
2025/26 Annual RAG Status
£000 £000 £000 £000 %
Employee Costs 7,855 2,209 8,112 257 3% 
Property Costs 1,349 283 1,381 32 2% 
Transport Costs 154 44 177 23 0% 
Supplies, Services And Admin 418 102 409 (9) -2% 
Support Services 2,584 646 2,584 0 0% 
Other Expenditure 420 109 437 17 4% 
Repairs & Maintenance 13,081 3,110 13,125 44 0% 
Bad Debt Provision 1,119 317 1,269 150 13% 
Void Loss (Council Tax / Lost Rents) 831 275 1,100 269 32% 
Loan Charges 29,055 7,143 28,571 (484) -2% 
Total Expenditure 56,866 14,238 57,165 299 1% 
House Rents (55,961) (14,000) (56,000) (39) 0% 
Lockup Rents (232) (58) (232) 0 0% 
Factoring Charges (448) (108) (430) 18 -4% 
Other rents (137) (34) (137) 0 0% 
Miscellaneous income (123) (21) (84) 39 -32% 
Total Income (56,901) (14,221) (56,883) 18 0% 
Net Expenditure (35) 17 282 317 
30 June 2025
Subjective Summary Forecast Variance
2025/26
ITEM 14 - APPENDIX 1
Page 127

Page 128

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2025/2026
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2025
PERIOD 3
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Employee Costs 7,855 8,112 257 3% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Bad Debt Provision 1,119 1,269 150 13% 
Main Issues
Mitigating Action
Anticipated Outcome
RAG
Status
Variance Narrative
The Council needs to make prudent provision for the non collection of HRA debt. HRA debt
has been increasing as officers more stringently apply the rechargeable repairs policy for
repairs caused by tenant neglect / abuse. These debts are difficult to collect because tenants
often have multiple other debts with the Council and others.
A review of the bad debt provision has identified a need to further increase the amount set
aside for irrecoverable debt.
Housing and Corporate Debt staff continue to work closely to maximise contact with customers
with debt and to put in place reasonable affordable repayment plans that take account of
customers personal circumstances.
A year end overspend.
Subjective Description
Provision for uncollected rent across range of HRA debts, including rent arrears, rechargeable repairs, insurance and factoring services,
capital works.
Cost of employees charged directly to the HRA.
Variance Narrative
Recruitment of critical posts and higher employer national insurance costs are creating a cost
pressure. The forecast also incudes a cost pressure for a higher than estimated pay
settlement. COSLA have offered employees a 4% pay award for 2025/26, the estimates
included a 3% provisiion.
Management will target staffing efficiencies, including tighter controls on staff recruitment and
overtime.
A year end overspend.
Variance Analysis
Forecast Variance
2025/26
Subjective Description
Subjective Analysis RAG
Status
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
ITEM 14 - APPENDIX 2
Page 128

Page 129

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/2026
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2025
PERIOD 3
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Void Loss (Council Tax / Lost Rents) 831 1,100 269 32% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Loan Charges 29,055 28,571 (485) -2% 
Main Issues
Mitigating Action
Anticipated Outcome
Housing staff will continue to engage with utility companies to highlight meter issues that are
preventing properties being available for let. Housing and Building Services staff will continue to
prioritise the repair and subsequent allocation of longer term void properties. Housing staff will
continue to develop and argue the case for additional council tax relief.
Subjective Description
Lost rental income for void houses and lockups and the cost of council tax on long term void properties.
Void numbers and council tax payments for longer term void houses are forecast to exceed
budget. There are ongoing challenges with utility companies as council staff try and resolve
debt on meters and meter reconnections. The poor performance of the utility companies
adversely impacts on the length of time properties are void and leads to more empty properties
incurring a council tax liability. The service is working with the council tax team / the assessor
service to secure maximum relief for several of our longer-term void properties.
A year end overspend.
Variance Analysis
Forecast Variance
2025/26
Variance Narrative
Subjective Analysis RAG
Status 
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
A year end underspend.
Subjective Description
Loans Fund repayments and the payment of interest and expenses on outstanding HRA debt.
Variance Narrative
HRA capital  debt at 31 March 2025 was lower than forecast and this led to lower debt
servicing costs across both debt repayment and debt interest.
None.
Page 129

Page 130

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/2026
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2025
PERIOD 3
Page 130

Page 131

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources 
Housing and Communities Committee: 20 August 2025
___________________________________________________________________
Subject: General Fund Housing and Communities Financial Report 2025/26
as at Period 3 (30 June 2025)
1. Purpose
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 30 June 2025 (Period 3) of General Fund Revenue
services under the remit of the Housing and Communities Committee.
2. Recommendations
2.1 Members are asked to
i) note the account currently shows a projected annual adverse variance of
£0.097m (10.8% of the net expenditure budget).
ii) note the progress on efficiencies incorporated into 2025/2026 budgets.
3. Background
3.1     Revenue Budget
Members agreed the 2025/2026 revenue estimates at the Council meeting on
5th March 2025. 
A total net expenditure budget of £0.902m was approved for services under
the Housing and Communities services remit.
Budget Approved 5 March 2025
Gross
Expenditure
£m
Gross
Income
£m
Net
Expenditure
£m
Homelessness Services 5.069 -4.241 0.828
Private Sector Housing 0.016 - 0.016
Private Sector Housing Grant 0.425 -0.382 0.043
Anti-Social Behaviour & CCTV 0.480 -0.175 0.305
Housing Maintenance Trading Organisation 20.581 -20.871 -0.290
Total  26.571 -25.670 0.902
ITEM 15
Page 131

Page 132

4. Main Issues
5. 4.1 Appendix 1 reports the forecast outturn for the services at £0.999m, a a
projected annual adverse variance of £0.097m (10.8% of the net expenditure
budget).
4.2 The Homelessness service is the only service forecasting an adverse
variance, with a forecast overspend of £99,000. Higher than planned service
delivery costs for the Ashton View supported accommodation service is the
main driver for the overspend. Employee cost pressures are particularly acute
within the Ashton View service because the service need to provide staffing
cover in line with Scottish Social Services Council (SSSC) staffing ratios. High
levels of sickness absence within the service have also led to increased use
of agency and temporary staff to meet ratios.  
4.3 The Homelessness service is reviewing staffing levels across other parts of
the service and reviewing rent recovery performance across homeless lets to
assess options to reduce the overspend and it is expected that the forecast
overspend will reduce as action is taken to reduce net expenditure across
other service areas
Appendix 2 provides a detailed analysis by service area.
Appendix 3 provides commentary of projected net annual variances greater
than £0.050m.
Appendix 4 shows progress on the delivering 2024/2025 saving options.  
5. People Implications
5.1 There are no people implications.
6. Financial Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report.
6.2      Agreed efficiencies for 2025/2026 are monitored with current indications being
that all the budgeted savings of £0.222m will be achieved (see Appendix 4). 
7. Risk Analysis
7.1 The present variances should be viewed in the knowledge that there are
several variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
Page 132

Page 133

9. Consultation
9.1 All services involved in delivering the budgets have been consulted in the
compilation of this report
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer, Resources                      
Date: 20 August 2025
___________________________________________________________________
Person to Contact: Jim McCarron  - Finance Business Partner,
16 Church Street, Dumbarton, G82 1QL
Telephone: 07772 322055
e-mail james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - Summary Budgetary Position (Revenue)
Appendix 2 - Detailed Budgetary Position (Revenue)
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Efficiencies/Savings Options
(Revenue)
Background Papers: None
Wards Affected: All
Page 133

Page 134

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2025/26
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 30 June 2025
Actual
Outturn
2024/25
Total Budget
2026/26
YTD
Spend
2025/26
Forecast
Spend
2025/26
Annual
RAG
Status
Net Variance
attributable to
earmarked
reserves
spend
Underlying
Variance
excluding
earmarked
reserves
spend
£000 £000 £000 £000 £000 % £000 £000
687 828 65 927 99 12%  0 99
11 16 4 16 0 0%  0 0
41 Private Sector Housing Grant 43 11 43 0 0%  0 0
312 305 86 303 (2) -1%  0 (2)
0 (290) (43) (290) 0 0%  0 0
1,051 902 123 999 97 11%  0 97
Housing Maintenance Trading Organisation
Total Net Expenditure
Service / Subjective Summary
Annual
Variance
2026/26
Homelessness Services
Private Sector Housing
Anti Social Behaviour & CCTV
ITEM 15 - APPENDIX 1
Page 134

Page 135

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2025/26
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 30 June 2025
PERIOD 3
Actual
Outturn
2024/25
Service Summary
Total
Budget
2026/26
YTD
Spend
2025/26
Forecast
Spend
2025/26
RAG Status
£000 £000 £000 £000 £000 %
14,172 Employee 14,748 3,446 14,090 (658) -4% 
2,564 Property 2,779 687 2,875 96 3% 
1,152 Transport and Plant 1,189 276 1,106 (83) -7% 
5,650 Supplies, Services and Admin 5,559 1,329 5,351 (208) -4% 
1,178 Payments to Other Bodies 1,267 285 1,299 3200% 3% 
1,019 Other 1,029 257 1,029 0 0% 
25,735             Gross Expenditure 26,571 6,280 25,750 (821) -3% 
(24,684) Income (25,669) (6,157) (24,751) 918 -4% 
1,051               Net Expenditure 902 123 999 98 11% 
£000 £000 £000 £000 £000 %
1,686 Employee 1,710 347 1,762 52 3% 
2,133 Property 2,352 532 2,362 10 0% 
14 Transport and Plant 14 2 11 (3) -21% 
78 Supplies, Services and Admin 68 12 79 11 16% 
840 Payments to Other Bodies 925 203 957 32 3% 
0 Other 0 0 0 0 0% 
4,751               Gross Expenditure 5,069 1,096 5,171 102 2% 
(4,064) Income (4,241) (1,031) (4,244) (3) 0% 
687                  Net Expenditure 828 65 927 99 12% 
£000 £000 £000 £000 £000 %
0 Employee 0 0 0 0 0% 
0 Property 0 0 0 0 0% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 0 0 0 0 0% 
11 Payments to Other Bodies 16 4 16 0 0% 
0 Other 0 0 0 0 0% 
11                    Gross Expenditure 16               4                 16                0 0% 
0 Income 0 0 0 0 0% 
11                    Net Expenditure 16               4                 16                0 0% 
Private Sector Housing
Annual
Variance
2026/26
Homelessness Services
All Services
ITEM 15 - APPENDIX 2
Page 135

Page 136

WEST DUNBARTONSHIRE COUNCIL Appendix 2
REVENUE BUDGETARY CONTROL 2025/26
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 30 June 2025
PERIOD 3
Actual
Outturn
2024/25
Service Summary
Total
Budget
2026/26
YTD
Spend
2025/26
Forecast
Spend
2025/26
RAG Status
Annual
Variance
2026/26
£000 £000 £000 £000 £000 %
42 Employee 42 11 44 2 5% 
118 Property 177 77 177 0 0% 
0 Transport and Plant 0 0 0 0 0% 
-2 Supplies, Services and Admin 0 (1) (2) (2) 0% 
207 Payments to Other Bodies 206 48 206 0 0% 
0 Other 0 0 0 0 0% 
365                  Gross Expenditure 425 135 425 0 0% 
(324) Income (382) (124) (382) 0 0% 
41 Net Expenditure 43 11 43 0 0% 
£000 £000 £000 £000 £000 %
293 Employee 273 85 271 (2) -1% 
71 Property 86 15 86 0 0% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 1 0 1 0 0% 
120 Payments to Other Bodies 120 30 120 0 0% 
0 Other 0 0 0 0 0% 
484                  Gross Expenditure 480 130 478 (2) 0% 
(172) Income (175) (44) (175) 0 0% 
312                  Net Expenditure 305 86 303 (2) -1% 
………………………………………………………………………………………………………………………………………………………………………………………….
£000 £000 £000 £000 £000 %
12,151 Employee 12,723 3,003 12,013 (710) -6% 
242 Property 164 63 250 86 52% 
1,138 Transport and Plant 1,175 274 1,095 (80) -7% 
5,574 Supplies, Services and Admin 5,490 1,318 5,273 (217) -4% 
0 Payments to Other Bodies 0 0 0 0 0% 
1,019 Other 1,029 257 1,029 0 0% 
20,124             Gross Expenditure 20,581        4,915          19,660         (921) -4% 
(20,124) Income (20,871) (4,958) (19,950) 921 4% 
0 Net Expenditure (290) (43) (290) 0 0% 
Housing Maintenance Trading Organisation
Private Sector Housing Grant
Anti Social Behaviour & CCTV
Page 136

Page 137

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Homelessness Services 828 927 99 12% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Maintenance Trading Organisation (290) (290) 0 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
30 June 2025
Budget Details
Variance Analysis
Variance
This service seeks to prevent homelessness occurring across the authority and improves
access to support services
The adverse variances on employee costs related to staffing pressures at the Ashton View
Supported Accommodation project where staffing levels are determined by the Scottish Social
Services Council ( SSSC ) requirements. There are also inflationary pressures across
supported accommodation contracts.
A year end overspend.
The service will achieve its budgeted surplus
None available
Employee cost underspend due to vacant posts within the service. Property cost overspend
due to a reassessment of depot costs charged to the HMTO. Transport and supply cost
underspend reflecting lower employee numbers and reduced throughput of work undertaken
by HMTO.
Lower income reflects reduced delivery costs / reduced throughput of work.
This service delivers maintenance and investment services to the council's housing stock
The service will minimise any overspend through tight control on recruitment and the
maximisation of housing benefit income across temporary accommodation properties and 
Ashton View supported accommodation properties.
ITEM 15 - APPENDIX 3
Page 137

Page 138

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2026/26 - BCR03
Efficiency Detail Reference
Budgeted
Amount £'000
Projection of
Total Saved
£'000
Projection of
Total Not Saved
£'000
Comment
1 Reduce budget for temporary accommodation furniture HE03 18                        18 0
2 CCTV Service Reduction HE04 31                        31 0
49 49 0
STATUS: COMPLETE
ITEM 15 - APPENDIX 4
Page 138