H&E Delivery Plan Year-end Progress 2024-25
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
2023/24 2024/25 Notes
Performance Indicator Statu
s Value Targe
t
Statu
s Value Targe
t
Short
Trend
Long
Trend
Owner
Number of incidents directed
to Police by Public Space CCTV
team
1232 400 856 400
Target exceeded demonstrating continued progress in
supporting with the detection of crime and promoting
community safety.
Nicola
Pettigrew
% of anti-social behaviour
cases resolved
98.08
% 97% 97.03
% 96%
Target exceeded demonstrating continued progress in
supporting residents with antisocial behaviour
complaints.
Nicola
Pettigrew
% of Public Space CCTV
cameras that are operational
78.29
% 85% 74.75
% 85%
Target not met. Work is underway to complete the full
upgrade for CCTV, significantly increasing camera
coverage and moving from analogue to digital
technology.  This has temporarily impacted on
operational cameras due to upgrade works.  Project
expected to be completed mid-June 2025.
Nicola
Pettigrew
Action Status Progress Due Date Note Owner
Implement second phase of
CCTV equipment and
infrastructure modernisation
and improvements
31-Mar-
2025
This action has been successfully completed. To date we have finalised
costings with BT and gained approval at Housing and Communities
Committee in August and contract with BT has been signed. We have
confirmed with WDTRO every 2nd landing to have CCTV. Our focus over the
Nicola
Pettigrew
ITEM 8 - APPENDIX 1

Page 2

Action Status Progress Due Date Note Owner
coming year will be to manage the new upgrades and ensure any snagging
issues are resolved timely.
Objective 2. Our residents’ health and wellbeing remain a priority
2023/24 2024/25 NotesPerformance Indicator Statu
s Value Targe
t
Statu
s Value Targe
t
Short
Trend
Long
Trend
Owner
% of Youth Homelessness
levels in West Dunbartonshire 23% 25% Data unavailable until June 2025. John Kerr
Action Status Progress Due Date Note Owner
Develop and introduce a new
preventative focused housing
access system
31-Mar-
2025
This action has not progressed as planned due to a delay with the Housing Bill
receiving royal assent before the summer recess. The team have carried out
preparatory work in readiness for the new Bill and this work will continue in
2025/26 to complete this action.
John Kerr
Objective 3. Our residents are supported to increase life and learning skills
Action Status Progress Due Date Note Owner
Deliver new tenant
participation strategy
31-Mar-
2025
This action has been successfully completed. The New Strategy 'Involving you
in improving Housing Services' was agreed at HACC 20/11/24 which includes
an action plan for implementing the strategy 2025-28.
John Kerr
2. Our Environment

Page 3

Objective 6. Our neighbourhoods are sustainable and attractive
2023/24 2024/25
Performance Indicator Statu
s Value Targe
t
Statu
s Value Targe
t
Short
Trend
Long
Trend
Owner
Tenancy Sustainment Levels
within Housing First 100% 90% 100% 90%
Target met - overall Housing First tenancy sustainment
rate for 2024/25 was 100% with all of the tenancies
created in 2023/24 sustaining for at least 12 months.
We continue to maintain our Housing First initiative as
part of the delivery of our wider Housing Solutions
approach and overall tenancy sustainment rates remain
high and above target.
John Kerr
% of all homeless cases re-
assessed within 12 months
(repeat homelessness)
5.9% 4% Data unavailable until June 2025. John Kerr
Average length of time to re-
let properties 34.99 30 Data unavailable until June 2025. Nicola
Pettigrew
The number of incidences of
youth homelessness in West
Dunbartonshire is reduced
249 280 Data unavailable until June 2025. John Kerr
% of council dwellings that
meet the Scottish Housing
Quality Standard
51.19
%
66.65
% Data unavailable until June 2025. Alan
Young
Number of new supply social
housing 83 80 Data unavailable until June 2025. John Kerr
% Satisfaction with quality of
new build council housing 100% 80% Data unavailable until June 2025. John Kerr

Page 4

2023/24 2024/25
Performance Indicator Statu
s Value Targe
t
Statu
s Value Targe
t
Short
Trend
Long
Trend
Owner
% of council houses that are
energy efficient
86.9
% 100% Data unavailable until June 2025. Alan
Young
Action Status Progress Due
Date Note Owner
Ensure compliance with tenant
safety standards (e.g. EICR,
Gas safety, Mould &
Dampness)
31-Mar
-2025
This action has been successfully completed. We continue to have a strong
focus on Tenant safety in line with the Scottish Government and the Housing
Regulator guidance. Over the last year we have secured funding to secure the
recruitment of new posts and identified and agreed an optimal structure to
take forward the work around tenant safety; implementation will begin in
2025/26.
Martin
Feeney;
John Kerr
Ensure the Council’s Housing
stock maintains compliance
with the Scottish Housing
Quality Standard and reduce
the number of properties held
in abeyance.
31-Mar
-2025
This action has been successfully completed.  Capital Investment programme
for 24-25 has been completed contributing to maintaining and progressing
SHQS compliance.
Alan
Young
Ensure the Council’s Housing
stock progresses towards the
achievement of the energy
efficiency standard for social
housing.
31-Mar
-2025
This action has been successfully completed.  Capital Investment programme
for EWI completed for 24-25 contributing to improving EESSH compliance. Alan
Young
Develop approach to the new
Social Housing Net Zero
Standard
31-Mar
-2025
This action has not been completed as planned. The Social Housing Net Zero
Standard will set out the regulations for how social landlords heat residential
properties, as well as how energy efficient the buildings need to be. To date
John Kerr

Page 5

Action Status Progress Due
Date Note Owner
we have provided a response, agreed through the Better Homes Board, to the
Scottish Government consultation. The team have carried out preparatory
work in readiness for the new standards however publication of the standard is
currently unknown which has impacted on our ability to complete the action
this year.
Deliver on the More Homes
Programme
31-Mar
-2025
This action has been successfully completed. To date, we have agreed a new
revised programme with the Scottish Government, we have completed on the
development at Clydebank East and developed the Housing Investment Plan
for 25-30.
John Kerr
Deliver new Housing Asset
Management Strategy
31-Mar
-2025
This action has not been completed as planned due to resourcing within the
service. To date we have completed the stock modelling exercise which will
form the basis of the remaining work. It is anticipated this will be complete and
presented to the Housing and Communities in August 2025.
John Kerr
Assess requirement for
declaration of housing
emergency within West
Dunbartonshire.
31-Mar
-2025
This action has been successfully completed. The Housing and Communities
Committee declared Housing Emergency on 1st May 2024, in response we
have developed the Housing Emergency Declaration Action Plan, identifying
key priority areas to be addressed over the coming years, this was approved by
the Housing and Communities Committee in August 2024. Ongoing monitoring
of the action plan will be overseen by the Housing Emergency Project Board
and will be reported on a quarterly basis to Committee. The Housing Summit
was held in February to further strengthen a partnership approach.
John Kerr
Refresh our strategic housing
investment programme
31-Mar
-2025
This action has been successfully completed. To date we have reviewed our
resources; this was updated to members in August 2024. We have developed
the new SHIP and delivered the refreshed programme.
John Kerr
Develop and introduce a wider
national rented home strategy
31-Mar
-2025
This action has not been completed as planned due to the delay with the
Housing Bill receiving royal assent before the summer recess. To date we have John Kerr

Page 6

Action Status Progress Due
Date Note Owner
responded to the publication of The Housing (Scotland) Bill and reported back
to the Housing Bill steering group and carried out preparatory work around the
needs analysis in readiness for the new Bill, it is anticipated that this will be
completed and reported to the Housing and Communities committee in
August 2025.
Implement digital
improvement for housing
operations (mobile app)
31-Mar
-2025
This action has been successfully completed. To date we have implemented
improvements to the mobile app for housing officers this includes pre
termination visit and new tenant visit and improving communication with
tenants; rolled out of Rent Insight functionality to enable timely and accurate
information relating to rent accounts promoting efficiency for the Council. We
have progressed the use of Power BI to support balanced scorecards for
further performance analysis for all wards and new tenant visits.  Over the
following year we will continue to develop the functionality of the mobile app.
Nicola
Pettigrew
Implement digital
improvement for housing
operations (self-serve portal)
31-Mar
-2025
This action has been successfully completed. To date we have introduced a
number of automated housing processes. This includes applying for housing
allowing for initial application, verification and upload of supporting
documents; over the following year we will progress this functionality to
provide a status update regarding waiting list position. We have mapped the
process for medical applications and will continue to develop this over the
coming year. Through the housing management team and Housing
Improvement Board we will continue to identify and explore opportunities to
improve the digital customer journey.
Nicola
Pettigrew

Page 7

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to meet
citizen
expectation and
service standards
Risk of citizen dissatisfaction due to
us not doing what we say we will
when we say we will or not
completing required works first
time. 
03-April-
2025
Building services improvement plan
identified key improvement areas to
increase satisfaction with the service. 
Recent satisfaction with repairs
achieved 90.2% demonstrating the
significant progress made over the last
few years.
Martin
Feeney
Failure to deliver
medical
adaptations in
agreed target
timescales
This is monitored to ensure target
timescale of 44 days average for
housing medical adaptations is
adhered to ensure satisfaction with
the service and support those in
need of this service. 
07-April-
2025
We have shown some improvement
against the target assessment.
Progress continues with good in-year
progress and continuing to clear legacy
jobs helping to improve the overall
position. Average days performance
continues to improve on track overall
for improvement and reducing risk.
Alan
Young
Failure to achieve
the outcomes of
the Scottish
Social Housing
Charter
The Scottish Social Housing Charter
sets out the standards and
outcomes that tenants and
customers should expect from
social landlords, in terms of the
quality and value for money of the
services they receive. Failure to
continue to meet these could place
the Council at risk of the
intervention powers of the Scottish
Housing Regulator
07-April-
2025
Assessment remains as previous,
however increased risk concerns have
been identified and included within
the Councils Annual Assurance
Statement which was submitted to the
Housing Regulator in October
John Kerr

Page 8

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to deliver
on homelessness
prevention
The risk that, similar to other Local
Authorities we will be unable to
adequately meet housing needs
due to rising costs and reduction in
funding.
07-April-
2025
Assessment upgraded and linked to
the housing emergency declaration
2024. Key aspect of housing
emergency action plan is to accelerate
homeless prevention activities in
advance of homeless prevention duties
as noted in the current Housing Bill.
John Kerr
Failure to
maintain Housing
Stock
The risk that Council’s Housing
Stock are not fully fit for purpose
with consequent adverse impact
on our ability to deliver efficient
and effective housing for Council
tenants.
07-April-
2025
No change to risk score, programme
for investment and upgrades to council
housing continues into 25-26 and a
further five-year programme to 29-30.
Alan
Young
3. Our Economy
Objective 8. We will support our residents to access employment and training opportunities
2023/24 2024/25 Notes
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
Value (£) of debt managed £1,217,
867
£1,220,0
00
£1,394,
794
£1,150,
000
Target exceeded. Overall, over the
year, 128 clients were supported to
manage debt.
Stephen
Brooks

Page 9

2023/24 2024/25 Notes
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
Number of local people
entering employment through
Working 4U
439 407 537 417
Target exceeded, showing
significant improved performance
from the previous year.
Stephen
Brooks
Number of local people
entering education or training 1,064 783 1,178 827
Target exceeded. By connecting
with individuals in both formal and
informal settings, we have
successfully supported 1,178
people in progressing toward their
goals. These training programmes,
funded through Skills Development
Scotland (SDS), No One Left Behind
(NOLB), UK Shared Prosperity Fund
(UKSPF) and Adult learning budgets,
are designed to help service users
develop essential skills and
employment related skills to
improve their future prospects.
Stephen
Brooks
Number of local people
gaining a full qualification 867 561 1,021 674
Target exceeded. Showing
significant improved performance
in both the long and short term.
Stephen
Brooks

Page 10

Action Status Progress Due
Date Note Owner
Review the current CLD Plan
and compile a new plan for the
2024 – 2027 planning period.
31-Mar
-2025
This action has been successfully completed. The CLD plan 24-27 has been
produced by the CLD Strategic Group and will be published online by the end
of October 24.  Action plans for Youth Alliance, Adult Learning Partnership and
Community Development Alliance have been developed and agreed with key
stakeholders for the duration of the new 3 Year CLD Plan.
Stephen
Brooks
Continue to develop access to
welfare rights and debt
management services
31-Mar
-2025
This action has been successfully completed. A reporting schedule has been
agreed with HSCP, and quarterly progress reports are shared showing the
number of unpaid carers supported by the Welfare Rights team as well as
value of income generated, and debt managed.  An end of year report
summarising activity and outcomes is also produced and shared with HSCP.
Two dedicated Welfare Rights advisors are now working with Housing to offer
pre-tenancy welfare advice and guidance with the aim to maximise income and
ensure affordability for new tenants.  Welfare support is also offered to
current tenants to maximise income, reduce debts and support residents.
Stephen
Brooks
Continue to provide access to
employability services
31-Mar
-2025
This action has been completed. Working4U continues to develop and deliver
employability services which meet the needs of residents with barriers to
accessing work as well as offering in-work support.  Through the Strategic
Employability Group funding for delivery of employability services from
partners has been commissioned for 24/25 and provision focuses on parents,
vulnerable young people, economically inactive people, people with disabilities
including mental health, community justice service users, ethnic minorities and
those who are long term unemployed. We have reviewed progress and will use
information to develop our services in the forthcoming year.
Stephen
Brooks
Continue to provide access to
community-based learning
opportunities
31-Mar
-2025
This action has been completed. A new CLD 3 Year Plan (24-27) has been
published for West Dunbartonshire with subsequent actions for the Strategic
CLD Partnership and the 3 subgroups – Adult Learning Partnership, Youth
Stephen
Brooks

Page 11

Action Status Progress Due
Date Note Owner
Alliance and Empowerment DIG.  A high-level report for the three subgroups
has been agreed and shared quarterly with the Strategic Group.
Objective 9. We will work with partners to support economic development to deliver increased prosperity for our area
2023/24 2024/25 Notes
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
Total Value (£) of Income
Generated
£8,229,
424
£5,200,0
00
£9,218,5
27
£5,200,0
00
Target exceeded and showed
increased performance from the
previous year.
Stephen
Brooks
Number of local people
receiving support through
Working 4U
8,597 5,527 8,116 6,190
Target exceeded. The demand for
support from Working 4U has
consistently remained higher than
anticipated due to a range of
factors. These include an increase
in individuals seeking benefits and
debt advice, as well as growing
participation in employability and
learning programmes; UKSPF; No
One Left Behind; and Child
Poverty/Parental Employability
Support.
We will continue to utilise
resources from grant funding
sources to meet the ongoing
Stephen
Brooks

Page 12

2023/24 2024/25 Notes
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
demand of those target groups in
need.
2023/24 2024/25 Notes
Performance Indicator Status Value Target Status Value Target Long
trend
Short
trend
Owner
Number of people receiving
support through Working 4U
with more than one barrier to
employment (aggregate)
1,581 779 1,507 854
Target exceeded. Showing
significant improved performance
in both the long and short term.
Stephen
Brooks
Percentage of local people
with increased or sustained
income through reduced debt
liability/debt management
98.4% 90% 83.1% 90%
Target narrowly missed. With the
help of Working4U, 347 local
residents were supported with
debt advice/issues.  128 of these
were assisted to manage £1.4
million worth of debt.  83.1%
proceeded with their agreed debt
strategy options, with the
remaining 16.9% being undecided
at this time.
Stephen
Brooks

Page 13

Action Status Progress Due
Date Note Owner
Develop a new employability
partnership action plan
31-Mar
-2025
This action has been completed. An annual investment plan has been written
and submitted to the Scottish Government as a condition of the No One Left
Behind (NOLB) grant by 30th April 25. This is informed by the priorities
identified by the Strategic Employability group for West Dunbartonshire.
A new 3-year Employability Plan for Employability will be produced reflecting
the Scottish Government priorities through NOLB and the UK Government
priorities through UK Shared Prosperity Fund.
Stephen
Brooks
Explore the potential for
securing training and
opportunities in the
carbon/green energy sectors
31-Mar
-2025
This action has been completed. W4U engage with the green sector and offer
Employer Recruitment Incentives (ERIs) which contribute to this indicator by
collaborating with industry partners to identify in-demand skills and
qualifications. Additionally, we commission training providers to map out
relevant courses and apprenticeship pathways. By working closely with
employers, W4U can ensure alignment with workforce needs and support
jobseekers in obtaining industry-standard qualifications, ultimately enhancing
employability and career progression within the growing carbon and green
energy sectors.
We have provided access to training for mechanics training modules that focus
on the specific skills required for maintaining and repairing electric and hybrid
vehicles. This includes, for example: Understanding Electric Vehicle
Systems: Safety Protocols: Diagnostic Skills: Sustainability Practices and Hybrid
Technology.
Stephen
Brooks
Compile and publish the local
child poverty report to
demonstrate our actions to
31-Mar
-2025
This action has been completed. The Child Poverty Plan has been published
and is available online. A Child Poverty event was hosted to share information
about the range of services working to tackle poverty and its impacts in West
Dunbartonshire.  Working4U worked in partnership with the Improvement
Stephen
Brooks

Page 14

Action Status Progress Due
Date Note Owner
address poverty and
disadvantage
Service to undertake a self-evaluation on partners knowledge of the impact of
Child Poverty and the accessibility of services to support families locally.  The
Family Prosperity network (FPN) has been established.
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to
respond to child
poverty
legislation will
have a significant
impact on the
Council’s
reputation, more
importantly an
opportunity to
raise issues and
respond more
effectively to
child poverty
issues will be lost
The Local Child Poverty Plan sets
out what we will do to respond to
child poverty, failure to respond
will have a significant impact on
the Council’s reputation, more
importantly an opportunity to raise
issues and respond more
effectively to child poverty issues
will be lost
17-Mar-2025
We have established a process for
developing the local child poverty
report and will undertake a self-
evaluation to assess the effectiveness
of our approach. The self-evaluation
will inform future developments. The
Child Poverty Plan has been published
and is available online. A Child Poverty
event was hosted in 2024/25 to share
information about the range of
services working to tackle poverty and
its impacts in West Dunbartonshire.
Stephen
Brooks
The cost-of-living
crisis will lead to
a substantial
demand for
access to
We will monitor the changing
levels of demand and target our
resources to individuals and areas
that are most in need. We will seek
to work with partners to ensure we
17-Mar-2025
We have shown some improvement
against the target assessment. We
have reviewed our processes for
dealing with referrals and carrying out
assessments. This emphasises the
Stephen
Brooks

Page 15

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
welfare/debt
support services.
receive appropriate referrals who
can benefit from our support.
need to respond quickly to those most
in need while directing those with
lower levels of need to appropriate
partner and alternative sources of
support.   Welfare rights team have
improved the triage system for
referrals being received from residents
with most contacts being made within
4 working days of referrals being
received.
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
2023/24 2024/25
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
% of properties returned from
repairs within target 53% 80% Data unavailable until June 2025. Martin
Feeney
Average time taken (in days)
to complete medical
adaptations
45.3 44 Data unavailable until June 2025. Alan
Young
Average time (in days) to
inspect and repair empty
homes
27 12 Data unavailable until June 2025. Martin
Feeney

Page 16

2023/24 2024/25
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
Percentage of repairs
appointments kept 92.6% 91.5% Data unavailable until June 2025. Martin
Feeney
% of properties that require a
gas safety record which had a
gas check and record
completed by the anniversary
date
100% 100% Data unavailable until June 2025. Martin
Feeney
Percentage of reactive repairs
carried out completed right
first time
85.6% 90% Data unavailable until June 2025. Martin
Feeney
% of tenants satisfied with the
repairs and maintenance
service
94.82
% 86% Data unavailable until June 2025. Martin
Feeney
Average length of time (in
hours) taken to complete
emergency repairs
5.11 6 Data unavailable until June 2025. Martin
Feeney
% of council rent that was lost
due to houses remaining
empty
1.01% 1% Data unavailable until June 2025. Nicola
Pettigrew
Average time taken (in days)
to complete non-emergency
repairs
10.94 8.4 Data unavailable until June 2025. Martin
Feeney

Page 17

Action Status Progress Due
Date Note Owner
Develop and implement
wellbeing, employee
engagement, equality and
learning and development
plans to enable capabilities,
improve resilience and
promotion of a diverse
workforce
31-Mar
-2025
Workforce actions have not been completed as planned. Significant progress
has been made in this area including review of succession planning for all
services, improved communication of key Council information to frontline
workers via digital channels and management of absences and improved
performance around return-to-work arrangements. Setting up all frontline
employees with access to the HR 21 system has been challenging and will
remain the remaining focus for this action over the coming year.
Peter
Barry
Develop and implement
employee life cycle plans in
line with the People First
Strategy to attract and retain
the workforce
31-Mar
-2025
Workforce actions have not been completed as planned. Significant progress
has been made in this area including carrying out the review of team leader
role within Housing Services, submitted job evaluations for the roles as well as
improving access to opportunities to improve skills and knowledge.  Building
Service have carried out a review of their delivery model to support a service
redesign. The new structure has been approved at SSRG and is currently being
implemented. Elements of completing this action have been challenging such
as financial constraints as well as challenges in recruitment for key roles such
as electricians. Building services currently have a number of fixed term
contracts of which some still require authorisation for permanency and work
will continue over the coming year to complete the service redesign to ensure
an efficient service.
Peter
Barry
Implement service review
process including role design,
use of new technology and
new ways of working to add
resilience, address gaps, and
establish opportunities for
efficiencies
31-Mar
-2025
Workforce actions have not been completed as planned. Significant progress
has been made in this area, services have carried out reviews to ensure they
are compliant with the Councils strategic operating model (SOM) are well as
reviewing service delivery models to ensure they are efficient. Areas that still
require work to complete this action include finalising a new team structure
following the inclusion of a new team in Housing Asset and Investment and
Peter
Barry

Page 18

Action Status Progress Due
Date Note Owner
review offering of condensed hours within the teams; this work will continue
over the coming year.
Develop and implement
learning and development
plans and development
opportunities to improve
capabilities and resilience
within the workforce
31-Mar
-2025
Workforce actions have not been completed as planned. Significant progress
has been made in this area, particularly around reviewing skills gaps within the
teams to ensure they meet the demands of new technologies and ways of
working. Resource pressures have delayed this action somewhat and over the
coming year the Housing Development team will continue to progress the
action to build on the Housing Academy to support employees with continued
professional development.
Peter
Barry
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
2023/24 2024/25
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
% of tenants satisfied with
the overall service provided
by their landlord
61.3
3% 76% 87% 84%
Target exceeded. Significant progress has
been made in this area overall. Satisfaction
with particular aspects of the housing
services included: satisfaction with the quality
of their home (87.2% up 25.1% points);
satisfaction with the management of their
neighbourhood (86% (up 23.3% points) and
satisfaction that rent costs represented good
value (85.6% up 25.1% points). As well as
showing improvement over the two years, the
results showed that West Dunbartonshire
John Kerr

Page 19

2023/24 2024/25
Performance Indicator Status Value Target Status Value Target Short
Trend
Long
Trend
Owner
Housing Services performed better than the
Scottish local authority average.
Action Status Progress Due
Date Note Owner
Implement improvement plan
for Building Services – year 4
31-Mar
-2025
This action has been successfully completed. Over the last year we have
achieved a number of improvements particularly around the financial
management of the service where we have reduced costs related to overtime
use of agency works and use of sub-contractors. Over the coming year we will
progress year five of the Building Service improvement plan with a focus on
completing job evaluations appropriate to the service needs.
Martin
Feeney
Implement improved void
management process to
ensure sustained reduction in
number of void properties
31-Mar
-2025
This action has been successfully completed. Over the last year we have
achieved a significant reduction in the average cost to bring a void property
back to the Councils' relet standard. in relation to our aim to reduce
operational voids we have shown significant improvement from the previous
year and exceeded this year’s target. We will continue to ensure this progress
is sustained.
Martin
Feeney

Page 20

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Failure to
implement IHMS
system across
building services
The effective implementation of
the IHMS system will delivery
efficiency, improve case tracking,
capture customer satisfaction and
improve service delivery.
03-April-
2025
We have shown significant
improvement against the target
assessment. IHMS has been fully
implemented in Building Services with
operatives using IHMS compatible
devices reducing the need for manual
input.
Martin
Feeney
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Long Term Trends
Improving
No Change
Declining
Action Status
Overdue
Not on track
In Progress and on track
Completed
Risk Status
Alert
Warning
OK
Short Term Trends
Improving
No Change
Declining