1.    INTRODUCTION
1.1  On 10th June 2021, Argyll and Bute Council approved the mothballing of Achaleven Primary
School. The Council agreed that in the event that there are no registered pupils by the
commencement of session 2022/23 the school be considered for formal closure through the
statutory process. 
https://www.argyll-bute.gov.uk/moderngov/ieDecisionDetails.aspx?AIId=149205 
On 25th August 2022, the Community Services Committee agreed that the Education
Service would undertake the required preliminary consultation and an options appraisal, for
Achaleven Primary School. The Community Services Committee received a report presenting
and outlining details of a potential formal consultation under the Schools (Consultation)
(Scotland) Act 2010 (as amended) and a broad timeline of this process. 
https://www.argyll-
bute.gov.uk/moderngov/documents/g14780/Public%20reports%20pack%20Thursday%202
5-Aug-2022%2010.00%20Community%20Services%20Committee.pdf?T=10 
The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young People
(Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a rural school and details
specific requirements which the education authority is required to follow if they are
formulating a proposal to close a rural school. This includes the introduction of a preliminary
consultation process. 
In addition, the Community Empowerment (Scotland) Act 2015 sets out a new right for
community organisations to request the transfer of local assets into local community
ownership/management. Public bodies, including councils, must consider such requests
and respond to them within a reasonable timescale. 
Achaleven Primary School has had zero pupils enrolled since elected members approved
the mothballing.   
On 25th August 2022, the Community Services Committee agreed that the Education
Service would undertake the preliminary requirements in relation to considering a rural school
closure and look at an options appraisal for Achaleven Primary School. This review will enable
the Education Service to identify and consider the options put forward. 
The 2010 Act makes special arrangements in regard to rural schools that is in effect a
presumption against their closure.  There is a requirement to have special regard to the
rural schools factors prior to formulating a proposal to close a rural school. In particular, it is
necessary to consider any reasonable alternatives before considering closure. It is also
necessary to consider the impact on the wider community of a potential closure (and all of

Page 3

3 
the reasonable alternatives) and the impact of any different travel arrangements. These
factors have been considered in this options appraisal. 
2.  REASONS FOR THE PROPOSAL
2.1  An authority that is contemplating formulating a rural school closure proposal must satisfy
the preliminary requirements set out in section 12A of the 2010 Act before starting to
prepare its proposal paper. In particular, it must identify the underlying reasons why the
future of the School is being considered, which are as follows: 
1. Achaleven Primary School has been mothballed since August 2021. There were no
pupils registered at the school for session 2021/22 and the roll was not predicted to rise
in the near future. This continues to be the situation. 
2. Along with several other rural councils, Argyll and Bute is facing increasing challenges
in recruiting staff. In January 2023 there were 15.9 fte vacancies for both Head
Teachers and Teachers. 
3. Whilst the School is mothballed, the building is deteriorating with limited budgets for
maintenance.
The Council is therefore considering the future of Achaleven Primary School. The various
options are explored within this paper. 
3.  BACKGROUND
Argyll and Bute is an area of outstanding natural beauty sitting within an ancient landscape
with a strong cultural identity. Today, the culture of Argyll and Bute is reflected in its
traditional industries of fishing, farming and crofting, sports such as shinty and in its world
class musicians and artists as well as its modern commercial industries such as wind
turbine production and fish farming. 
Argyll and Bute is geographically the second largest authority in Scotland. Education is
delivered in a range of settings including schools, partnerships and youth services. 
3.1  Argyll and Bute Corporate Plan
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of Scotland with
outstanding places, people and potential for a prosperous future for everyone. Our Council
along with our Community Planning Partners, is committed to ensuring that Argyll and
Bute’s Economic Success is built on a Growing Population. 
This strategic approach embraces the vision for our area, our communities and our people
as outlined in the Corporate Plan. Our key service priorities support the delivery of our
commitments in the plans, helping to focus on local outcomes that will achieve meaningful
improvements for the area, our local communities and our citizens. 
Councils have a statutory responsibility in terms of the Local Government in Scotland Act
2003 to achieve best value. Our Community Services Asset Management Plan provides a
review of the property assets used to deliver services. It incorporates the School Estate
Management Plan which reflects the local implementation of Building Better Schools:

Page 4

4 
Investing in Scotland’s Future, the national school estate strategy developed by the Scottish
Government in conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within Building Better Schools
are reflected throughout Education and Children’s Services Asset Management Plan
(SAMP) for schools and public buildings, both in the management of the existing assets and
in the design and construction of developments. 
3.2  Our Children Their Future
Councils, as an Education Authority, have a statutory duty in terms of the Education
(Scotland) Act 1980 to make adequate and efficient provision of school education across
their entire area for the current school population and future pattern of demand. This is
reflected in Our Children, Their Future: Education Vision and Strategy. 
3.3  Achaleven and the Local Area - the Achaleven Primary School Setting
Achaleven Primary School is situated in the village of Connel, 5 miles north of Oban.
Connel is a small and picturesque village situated on the southern shore of Loch Etive and
sits at the end of Connel Bridge, a striking cantilever bridge which spans the sea-mouth of
the Loch and was built in 1903 to take the railway line to Fort William. Today it supports the
main A828 into Benderloch.  Achaleven Primary School sits within grounds between the
A85 and Loch Etive.   
3.4  The School within the Community
Achaleven Primary School was at one time, active within the community. The pupils invited
the community to attend events during the year. However, as the school roll diminished,
attendance at events decreased.  Whilst being mothballed, the school is not used for any
meetings or events, as these tend to be held in Connel Village Hall, a short distance (330
yards) from the school. 
3.5  Previous Mothballing and Re-Opening
In April 2011, two papers proposing the amalgamation of Achaleven Primary School with
either Dunbeg Primary School or Lochnell Primary School were taken to a special meeting
of Argyll and Bute Council. This resulted from the fact that Achaleven Primary School had
suffered a decrease of 52 pupils in its roll over the period (2005 – 2011), this was a decline
of 83% in the occupancy rate over the same period and the projected roll for 2011/12 was 8
pupils. Following this, Achaleven Primary School was mothballed from June 2011 to August
2012. Achaleven Primary School re-opened with four Primary 1 pupils in August 2012, as a
result of the Education Authority determining that the school had become viable again,
following a review of the mothballing. 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?CId=257&MID=4611 
3.6  Population
Argyll and Bute has an average population density of just 0.13 persons per hectare. This
coupled with the changing demographic profile of the area presents one of our greatest

Page 5

5 
challenges. The table below refers directly to the Achaleven area showing the changing
population from census 2001 to census 2011: 
Table 1: Population Information
Achaleven Area Census 
2001 2011
Total Resident
Population
135 Total Resident
Population
129
% under 16 17.77 % under 16 21.7
% 16 – 64 (pensionable
age)
54.81 % 16 – 64 (pensionable
age)
62.0
%  pensionable age
and over
27.41 %  pensionable age and
over
16.2 
It is recognised that the census area and the catchment area of Achaleven Primary School
differ slightly. 
3.7  Development and House Building
The current Local Development Plan (LDP2) was adopted in 2019. This sets out planning
and development proposals for the next 10 years from 2020 and a vision for 20 years.  The
Argyll and Bute Local Development Plan provides the local planning framework for the
Council area, excluding the Loch Lomond and Trossachs National Park area. The Plan is
divided into the written statement and proposals maps. The written statement provides the
general policy context against which planning applications for new development proposals
should be assessed. This is supported by the proposals maps which show the range of
development opportunities and constraints within the area, for example:
 the key development areas i.e. the allocations for housing, industry and business,
community facilities and infrastructure;
 the potential areas for future development (Potential Development Areas);
 areas requiring actions such as environmental improvement or regeneration (Areas for
Action); and
 environmental designations such as national Scenic Areas, Sites of Specific Scientific
Interest (SSSIs), Special Protection Areas and Local Nature Conservation Sites.
Appendix 1 shows the LDP for Achaleven/Connel. 
Appendix 2 provides the key for Local Development Plans. 
3.8  Achaleven Primary School
Achaleven Primary School, in Connel, is a non-denominational school situated on the main
A85 Glasgow to Oban road, by the Connel Bridge. The school serves the village of Connel
and its surrounding area from Achnacloich in the east to Dunstaffnage House in the west.
The main accommodation, which is over 100 years old, contains two classrooms, toilets,
staffroom, office, two resource storage areas, and display areas. There is a detached
annexe, which is used as a third classroom and a dining room where School meals are
served. Pupils have access to either a grass or a tarmac play area. 
Appendix 3 shows the Achaleven Primary School Floor Plan.

Page 6

6 
Achaleven Primary School is 2.8 miles from Dunbeg Primary School and 3.6 miles from
Lochnell Primary School. 
The Scottish Government’s Rural School List (October 2021) classifies Achaleven Primary
School as ‘very remote rural’.  This is defined as an area with a population of less than
3,000 people, and with a drive time of over 60 minutes to a settlement of 10,000 or more.
Achaleven Primary is one of 21 primary schools associated with Oban High School. 
3.9  Dunbeg and Lochnell Primary Schools
Following the mothballing of Achaleven Primary School, parents/carers have the choice to
send their children to either Lochnell or Dunbeg Primary Schools. 
Appendix 3 shows the Achaleven Primary Floor Plan
Appendix 4 shows the Lochnell Primary and ELC Floor Plan
Appendix 5 shows the Dunbeg Primary and ELC Floor Plan 
Lochnell Primary School is a non-denominational and co-educational school situated in the
village of Benderloch on the main Oban to Fort William road. The building is single storey
and was opened in 1992. The teaching bays in the original building are semi open plan.
The new extension teaching bays are open plan. The entire building is well maintained and
along with the surrounding scenery provides attractive accommodation for the primary
school. Lochnell Primary School has capacity for 147 pupils. 
A joint school and community project was completed to provide and maintain an all-weather
pitch adjacent to the school. The pitch is used very well by the school every day. The
community have access to the pitch out-with school times and the public can book it at the
local garage. 
The building has facilities for pupils and visitors with special access needs. The school has
very good links with Oban High School as their associated secondary school. Lochnell
Primary has a Pre5 Unit within the school for 3 and 4 year olds. 
Dunbeg Primary School is a non-denominational and co-educational school situated in the
village of Dunbeg approximately three miles from the town of Oban. It is a single storey
building originally opened in 1960 and has an extension to facilitate community activities.
Recent additions include toilet/shower facilities for children with additional needs. Facing
west are five classrooms and hall with large windows that provide a bright and pleasant
working atmosphere. In front is a split-level play area with garden and netball court.
To one side is a games field and to the other a well-equipped play park for younger
children. With capacity for 174 children of all denominations from P1-7, it also provides
preschool education with spaces for 20 3–5 year olds. The school has very good links with
Oban High School as their associated secondary school. 
The Scottish Government’s Rural School List 2021 classifies Achaleven, Dunbeg and
Lochnell Primary Schools as ‘very remote rural’. Oban High School is the associated
Secondary School for all three primary schools.

Page 7

7 
The Map below shows the adjoining catchment areas of Achaleven and Lochnell and
Dunbeg Primary Schools Catchment Areas: 
3.10  Pupil Numbers
Pupil projections, and data for 2023-24 are based on the 2022 pupil census, a return
prepared annually for the Scottish Government. Past pupil numbers are historic data from
past pupil censuses. Pupil projections for future P1 intakes are currently based on the 3
year average intake figure.  Historical data shows that from 2014-2020, an average of 5
placing requests were made to schools out-with the Achaleven Primary School catchment
area. This had a significant impact on the roll of Achaleven Primary School. There are
currently 36 primary aged children residing in the Achaleven Primary School catchment. 20
of these children currently attend Lochnell Primary School and 16 currently attend Dunbeg
Primary School.

Page 8

8 
Table 2 shows the historic and current pupil numbers for both Achaleven, Dunbeg and
Lochnell Primary schools: 
Table 2:  Achaleven PS Dunbeg PS  Lochnell PS
Capacity 41 174 147  
Roll Roll Roll
2008-09 39 80 92
2009-2010 27 81 87
2010-2011 8 79 92
2011-2012 0 76 96
2012-2013 4 73 101
2013-2014 5 76 112
2014-2015 9 81 109
2015-2016 10 82 114
2016-2017 12 78 124
2017-2018 9 99 130
2018-19 13 88 124
2019-20 9 98 114
2020-21 7 90 112
2021-22 0 88 119
2022-23 0 89 118 
Table 3 shows projected rolls for Achaleven, Dunbeg and Lochnell Primary Schools
according to figures held by Argyll and Bute Council:  
Table 3:  Achaleven PS Dunbeg PS Lochnell PS     
Capacity 41 174 147
2023 -2024 1 125 116
2024 -2025 0 128 114
2025-2026 0 130 122 
* A prediction based on information available date 
4.  COMMUNITY ENGAGEMENT 
4.1  Meetings
A Community Engagement Meeting was held in Achaleven Primary School, on December
1st, 2022 from 13:00-19:00 hours.  This was to seek the views of the community on the
future of Achaleven School. This meeting was attended by 5 people from 3 households.

Page 9

9 
There are currently no primary aged children in Lochnell Primary who previously attended
Achaleven Primary School, and there are currently 2 primary aged children in Dunbeg
Primary who previously attended Achaleven Primary School. 
4.2  Content of Meetings
Attendees at the meetings were given an overview of the information that the Council would
be using in this Options Appraisal, this included pupil projections, financial information,
development information and local services and facilities. 
The questions were as follows:
Over the last year and a half, what has been the effect of mothballing Achaleven School on
you, your family and community? 
In your view what are the pros/cons of the following options:
 Continue with mothballing
 Re- open the school
 Close the school 
Attendees also noted questions regarding the future of the school, and points of information
that should be considered in the Options Appraisal. 
4.3  Feedback 
There was a range of viewpoints on the future of Achaleven School:
 Community and Parents
The majority of the community were in agreement that the low numbers of
children did not make the re-opening of the school realistic.  There was a small
percentage of people in support of continued mothballing in order to retain the
building in case of future need. The majority of the community felt that it would be
disappointing if the building lay empty and became derelict and were keen to
explore other options for the building should the school close permanently.
Parents of children with very young children expressed concern that the school
may be closed but agreed this may be the best option when projected numbers
were clarified. 
 Staff
Staff members acknowledged that without a significant number of pupils, re-
opening the school is not viable. 
General Comments: 
‘I don’t think I would send my children to Achaleven if there were only a few other children
in the school.’

Page 10

10 
‘I already send my children to Lochnell as there is also Pre 5 provision there and transport
is easy’ 
‘Continued mothballing would mean further deterioration to the building and it may end up
beyond repair which would be a shame’ 
‘Mothballing could be beneficial if there are a viable number of children due to start at
Achaleven in the next few years but it wouldn’t be good for the children if there were going
to be very low numbers in classes and across the school’ 
‘Is there enough capacity at other local schools to accommodate pupils from Achaleven in
the future?’ 
‘It would be beneficial to have a safe cycle route to Dunbeg’ 
‘If projected numbers are very low or non-existent then it makes more sense to close’ 
Pupil comments 
‘I was worried and optimistic. The old school was small. We are a lot happier at Dunbeg
than we were at Achaleven.’ 
‘I was worried about moving from a small to a really big school. I was not used to it. I was
pretty ok afterwards. If I had to go back to a small school I'd feel pretty confused and I'd not
be used to it.’ 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE PROPOSAL AS
CONSIDERED BY THE COMMUNITY ENGAGEMENT
Achaleven Primary School has been mothballed since August 2021. The school roll was
very low and there were no pupils projected to attend in August 2021 or August 2022. The
roll is not predicted to rise above 1 pupil in the near future. There is very little community
support for the reopening of the school. 
Whilst the building is mothballed it continues to deteriorate. The community is keen to
ensure a future for the building if possible. Along with several other rural councils, Argyll
and Bute is facing increasing challenges in recruiting staff. In January 2023 there were 15.9
fte vacancies for both Head Teachers and Teachers. 
The Council is required to consider the future of Achaleven Primary School. The following
options are explored within this paper: 
a) Re-open Achaleven Primary School.
b) Continued Mothballing of Achaleven Primary with the pupils zoned to either Lochnell or
Dunbeg Primary Schools.
c) Close Achaleven Primary School and realign its catchment area to Dunbeg Primary
School

Page 11

11 
d) Close Achaleven Primary School and realign its catchment area to Lochnell Primary
School. 
6. OPTION A: RE-OPEN ACHALEVEN PRIMARY SCHOOL 
6.1  Community Feedback
Of the 5 community members that attended the Options Appraisal engagement event, no
one was in support of re-opening the School because the lack of feasibility due to low pupil
numbers. 
Pupil comment
‘Over all closing it was a healthy decision. It was really small and you couldn't really make
friends.’ 
6.2 Pupil Numbers
If the school were to reopen in August 2023, the maximum Primary 1 intake in terms of
catchment pupils would be one. It has been stated that without a viable number of pupils for
the School, parents would not be considering placing their children to attend Achaleven
Primary School if it were to re-open. In the six years from 2014-2020 (before the school was
mothballed in August 2021), an average of 5 placing requests were made to schools out-
with the catchment each year. Currently, there are 36 primary school aged children residing
within the catchment area for Achaleven Primary School. 20 of these pupils attend Lochnell
Primary School and 16 attend Dunbeg Primary School. 
If the school were to re-open, sustainability may not be viable due to the fact that pupil
numbers over the next four years are not predicted to rise and are well below the capacity
of the school building. 
Table 4: Pupil Numbers
Achaleven
Primary
2023/24 2024/25 2025/26 2026/27
Approved
Capacity
41 41 41 41
Roll
Projection
1 0 0 0 
6.3 Financial Information
The total amount including employee; premises; supplies and services and catering
consideration to re-open the school is £140, 6601 
The annual cost of mothballing Achaleven Primary School is £5,400. 
1 Annual costs for running a comparative school for Achaleven Primary School.

Page 12

12 
The cost to bring the property to an acceptable standard to re-open the school is £25,465.   
6.4  Assessment of Rural Factors 
The reasons why the future of Achaleven Primary School is being considered are as stated
at Section 2 of this report. There is no expectation for the pupil numbers at Achaleven
Primary School to increase. Achaleven Primary School is currently mothballed and there
were no pupils enrolled to start Primary 1 in either August 2021 or August 2022.  To reopen
the school would not increase the pupil numbers.   
6.4.1  Community Impact
The reopening of the school would enable the premises to be used by the
community. It would also be a possibility that the school pupils would invite the
community to specific events, as they did in the past. The presence of a school and
the facilities/activities that may be offered could make the area a more attractive
place to live although it is recognised that two other primary schools are nearby.
Reopening the school may therefore encourage families with school age children to
move to the community. This in turn may make the community more sustainable. 
However, the community have demonstrated no wish for the school to reopen.
Almost all who attended the community engagement event indicated that it would be
worthwhile to explore the repurposing of the school building to become a facility for
the community to use rather than an educational establishment. 
Respondents noted the negative impact of the school mothballing on the community
as: 
 The visual impact on the community of the mothballed school.
 The continued deterioration of the building. 
If the school were to reopen as an educational establishment there would be an
economic impact with respect to the considerable expenditure needed to bring the
building up to standard.  There would also be costs relating to staffing, and ongoing
maintenance.  Maintenance and building costs would also have to be met by the
community if the school were to reopen as a community hub.  The reopening of the
school and the potential relocation of families may have a positive effect on the wider
economy of the community. 
6.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85. Travel time is approximately 6 minutes by car/bus.
The travel distance from Achaleven Primary to Lochnell Primary is 3.6 miles via the

Page 13

13 
A85 and A828. Travel time is approximately 8 minutes by car/bus.  The travel
arrangements have been in place for 18 months. Travel is an accepted aspect of
living in the Achaleven community. If Achaleven Primary School was to reopen there
could be a positive impact on the health and wellbeing and education of pupils who
are able to walk or cycle to school. Staff would either travel to the school by car, or if
they live locally could walk or cycle. There may be a positive environmental impact
as the use of vehicles to transport pupils may decrease. Conversely, there could be
increased car usage by staff which may mean these travel arrangements have a
negative environmental impact. The respective positive and negative impact may
therefore balance.   
6.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no
specific educational benefits from reopening the school as all schools implement
Curriculum for Excellence ensuring effective learning and teaching which is matched
to the needs of children. 
With respect to outdoor learning, community spaces could be used either in the
school grounds or in the immediate neighbourhood if the school were to reopen. 
Outdoor learning is provided by all schools. 
There would be issues with respect to the current condition and suitability of the
school buildings and facilities which would negatively impact learning and teaching.   
6.6  Summary
5 people attended the consultation and the majority were not in favour of reopening
Achaleven Primary as a school.  If the school reopened, projected P1 pupil numbers
for August 2023 would be one, and this is predicted to decrease over the next three
years.   There are currently 36 children residing in the Achaleven Primary School
catchment area, 20 of these pupils attend Lochnell Primary School and 16 attend
Dunbeg Primary School.  An average of 5 placing requests to schools out-with the
Achaleven catchment area have been made each academic session from 2014 until
the school was mothballed in 2021. This has had a significant impact on the school
roll and the Primary 1 intake. 
There are financial implications if the school is to be reopened.  The total amount
including employee; premises; supplies and services and catering consideration to
re-open the school is £140,6602, with the cost to bring the property to an acceptable
standard to re-open the school is £25, 465.   
If the School was to be reopened, the premises would be able to be used by the
community out-with school hours as a hub, in addition to its use as an educational
facility. However, Connel Village Hall is a short distance from the school and is                                                 
2 Annual costs for running a comparative school for Achaleven.

Page 14

14 
currently used for community events.  The reopening of the School may encourage
families with school age children to move to the community, which may make the
community more sustainable. 
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85. Travel time is approximately 6 minutes by car/bus.
The travel distance from Achaleven Primary to Lochnell Primary is 3.6 miles via the
A85 and A828. Travel time is approximately 8 minutes by car/bus.  The travel
arrangements have been in place for 18 months. Travel is an accepted aspect of
living in the Achaleven community. If Achaleven Primary School was to reopen there
could be a positive impact on the health and wellbeing and education of pupils who
are able to walk or cycle to school. Staff would either travel to the school by car, or if
they live locally could walk or cycle. There may be a positive environmental impact
as the use of vehicles to transport pupils may decrease. Conversely, there could be
increased car usage by staff which may mean these travel arrangements have a
negative environmental impact. The respective positive and negative impact may
therefore balance.   
There are no specific educational benefits from reopening the school as all schools
implement Curriculum for Excellence ensuring effective learning and teaching which
is matched to the needs of children. 
When considering the above alongside projected low pupil numbers, the challenges
in recruiting teaching staff, the considerable expenditure needed to bring the building
up to standard and the lack of local support for reopening Achaleven Primary School
this is not considered to be a reasonable option. 
7.  OPTION B: CONTINUED MOTHBALLING OF ACHALEVEN PRIMARY SCHOOL
WITH PUPILS ZONED TO LOCHNELL AND DUNBEG PRIMARY SCHOOLS
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school and
the desirability of maintaining capacity to re-open a school there, but it is unlikely that
it should exceed 3 years in areas that are not very remote.” Achaleven Primary
School has been mothballed since August 2021. 
7.1  Community Feedback
There are some ideas for the future of the building which may be taken forward by
the community as a hub for community life, although it was noted that Connel Village
Hall is only 330 yards from the school. There was a significant view at the community
meeting that mothballing the school over a long period is wasteful due to
deterioration of the property and should not be prolonged: 
‘We are concerned that the building falls into disrepair and becomes derelict or an
eyesore’

Page 15

15 
‘It would be good to discuss potential future use of the building at a Community
Council Meeting’ 
‘It would be good if the building could house a nursery provision but understand that
low numbers may mean that this is not viable’ 
7.2 Pupil Numbers
Pupil numbers are not projected to increase over the next 4 years, as per Table 4
above. 
7.3  Financial Information
The current annual cost 2022/23 to the Council of the mothballed Achaleven Primary
School is £5,400. This includes electricity, heating oil, and ground maintenance but
does not include building maintenance and repair costs. Neither does it take account
of the cost to bring the property to an acceptable standard to re-open the school
which is £25,465.  Pupils living in the Achaleven Primary School catchment area are
currently transported to Lochnell Primary and Dunbeg Primary through parental
choice. A Council minibus transports the pupils to Dunbeg Primary at a cost of
approximately £19,009 per annum and a West Coast Motors service bus transports
the pupils to Lochnell Primary. Due to the fact that the West Coast Motors service
operates on an existing route and is part of a larger contract, there is no additional
cost to transport pupils from Achaleven to Lochnell Primary School. 
7.4  Assessment of Rural Factors 
The reasons why the future of Achaleven Primary School is being considered are as
stated at Section 2 of this Report. There is no expectation that the pupil numbers at
Achaleven Primary School will increase. Achaleven Primary School is currently
mothballed and although there are currently no registered pupils, pupils would be
rezoned to another local school. To reopen the school would not increase the pupil
numbers. 
7.4.1  Community Impact
If pupils are to continue their education in Lochnell and Dunbeg Primary
Schools there would be no change to the current impact on the community.  If
the mothballing of Achaleven was to continue the building would deteriorate
further and eventually become unavailable. This could have a detrimental
effect on the sustainability of the Achaleven community. At present the school
grounds are available for community use. The small number of community
residents who attended the meeting view the buildings and grounds as a
potential opportunity to develop a community hub and there were some
suggestions for possible usage. This may make the area a more attractive
place to live, and in turn, may positively impact community sustainability.

Page 16

16 
7.4.2  Travel Arrangements
There is no change to the travel arrangements that are currently in place nor
to the environmental impact from these.  The travel distance (sourced from
Google maps) from Achaleven Primary to Dunbeg Primary is 2.8 miles via the
A85. Travel time is approximately 6 minutes. The travel distance from
Achaleven Primary to Lochnell Primary is 3.6 miles via the A85 and A828 and
travel time is approximately 8 minutes. The travel arrangements have been in
place for 18 months. Travel is an accepted aspect of living in the Achaleven
community. Continued mothballing of Achaleven Primary School would have
no effect on current staff travel. The small number of children has minimal
effect on staffing within the receiving primary schools. Pupils living in the
Achaleven Primary School catchment area are currently transported to
Lochnell Primary and Dunbeg Primary through parental choice. Currently, a
Council minibus transports the pupils to Dunbeg Primary and a West Coast
Motors service bus transports the pupils to Lochnell Primary. 
7.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no
specific educational benefits from reopening the school as all schools implement
Curriculum for Excellence ensuring effective learning and teaching which is matched
to the needs of children. 
Achaleven, Dunbeg and Lochnell are remote rural schools. Each school is set within
a very remote rural area (Scottish Government classification).  Children from
Achaleven area, attending Lochnell and Dunbeg Primary Schools are benefitting
from the broader rural environment, whilst not moving their learning to a school that
is completely different to their home environment. High quality outdoor learning is
currently provided at both primary schools. 
The co-location of the nursery and the primary classes at Dunbeg and Lochnell
Primaries enhances the transition process for the children moving from Nursery into
Primary one, through joint educational processes and liaison between the settings.
Transition to secondary school is enhanced through joint planning and educational
experiences. 
7.6  Summary
The majority of people who attended the consultation were not in favour of
continuing the mothballing of Achaleven Primary School if projected pupil numbers
were not expected to rise. There was a view at the community meetings that
mothballing the school over a long period was wasteful due to deterioration of the
property and potentially affected sustainability of the community. Pupil numbers are

Page 17

17 
not predicted to rise in terms of pre-school children living within the catchment area.
Mothballing had no positive impact on the reasons for the proposal. 
The current annual cost (2022/23) to the Council of the mothballed Achaleven
Primary School is £5,400. This includes electricity, heating oil, and ground
maintenance but does not include building maintenance and repair costs. Neither
does it take account of the cost to bring the property to an acceptable standard to re-
open the school which is £25,465.  There is no current annual transport cost for
taking pupils to an alternative school. 
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85. Travel time is approximately 6 minutes. The travel
distance from Achaleven Primary to Lochnell Primary is 3.6 miles via the A85 and
A828 and travel time is approximately 8 minutes. The travel arrangements have
been in place for 18 months. Adverse weather can be a factor, however this is the
same for other local schools and areas. Pupils living in the Achaleven Primary
School catchment area are currently transported to Lochnell Primary and Dunbeg
Primary through parental choice. A Council minibus transports the pupils to Dunbeg
Primary and a West Coast Motors service bus transports the pupils to Lochnell
Primary. The travel arrangements have been in place for 18 months.  Should the
school continue to be mothballed these travel arrangements would continue. 
There are no specific educational benefits from continuing the mothballing of
Achaleven Primary school. 
On the basis that pupil numbers are not expected to increase significantly and the
building’s mothballing is not of benefit to the community or the Council, continued
mothballing of Achaleven Primary School is not viewed as a reasonable option. 
8.  OPTION C: CLOSE ACHALEVEN PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR DUNBEG PRIMARY SCHOOL TO INCLUDE THE
CURRENT ACHALEVEN CATCHMENT AREA 
8.1  Community Feedback
The majority of people who attended the Options Appraisal meeting were not in
favour of reopening Achaleven Primary as a school given the very low/ no projected
pupil numbers. They commented that there were not enough children to support re-
opening the School. Additionally, with respect to very low/ non-existent numbers in
future school roll projections, the sustainability of the School did not support re-
opening of the School. Comments in relation to the closure of Achaleven Primary
School and attendance at Dunbeg Primary School were generally positive:
‘It would be beneficial if there was a safe walk or cycling route to Dunbeg’ 
‘I would prefer that my child was able to walk or cycle to school but appreciate that in
a more rural setting, this isn’t always possible’

Page 18

18 
Pupil comments 
‘I wouldn't mind it (Achaleven) staying open but I would be upset to have to go back.
I'd like to stay here. I like a big school.’ 
8.2  Pupil Numbers
Table 5: Schools Occupancy: 
Primary 2023/2024 2024/25
Dunbeg
Approved
Capacity
174 174
Dunbeg
Projected
Roll 
125 128
Achaleven
Projected
Roll
1 0
Total Roll
Projection
126 128 
Occupancy 72.4% 73.5% 
Pupils from Achaleven Primary catchment area would attend Dunbeg Primary
School, as there are currently no pupils attending Achaleven there is no significant
projected addition to school roll at Dunbeg Primary School. The current occupancy
rate for Dunbeg Primary School is 51%.   There is a projected roll of one pupil for
Achaleven Primary for August 2023. This coupled with an increase in projected pupil
numbers within the catchment area will take the roll for Dunbeg Primary from 89 in
session 2022/23 to 126 in session 2023/24. The significant increase forecast is due
to new house building taking place in the area. The projected school roll for Dunbeg
Primary School is expected to increase incrementally over the next 9 years. By 2030,
Dunbeg Primary School is expected to have an occupancy rate of 90%. 
8.3  Financial Information
If the existing council minibus was to be used, this would cost approximately £19,009
per annum. If Achaleven Primary School were to be closed it would generate savings
of £5,400 - the current annual cost of mothballing (2022/23) to the Council. This
includes electricity, heating oil, and ground maintenance but does not include
building maintenance and repair costs. 
8.4  Assessment of Rural Factors 
The reasons why the future of Achaleven Primary School is being reviewed are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Achaleven Primary School to increase. Achaleven Primary School is currently
mothballed and were there pupils they would be rezoned to other schools. To reopen
the school would not increase the pupil numbers.

Page 19

19 
8.4.1  Community Impact
The community supported the proposed closure of the school with the building
and adjoining grounds being retained for community use where viable. All
people who attended the consultation stated that they would be in favour of
preliminary work to investigate whether the school building could be retained
for community use and not allowed to fall into further disrepair, as that would
adversely impact on the visual impact of the village. While it is accepted that
school closure may have an adverse effect on a community, a community hub
could be an asset to a community. However, as previously stated, Connel
Village Hall is situated 330 yards from Achaleven Primary School and is used
for village events.  If the Community wished to create a community hub, they
would require to find a mechanism to acquire the property from the Council
and deliver that aspiration. The buildings forming the school premises are
situated within walking distance of the village. If the local plans for the building
progress, this may have a positive impact on the sustainability of the village.
Formal closure of the school would mean that these plans could potentially be
progressed by the community. 
8.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Achaleven Primary to
Dunbeg Primary is 2.8 miles via the A85. Travel time is approximately 6
minutes. The travel arrangements have been in place for 18 months. Travel
is an accepted aspect of living in the Achaleven community. This option
would have no effect on the current travel arrangements of staff and pupils.
The closure of Achaleven Primary School, in terms of travel would have a
neutral effect on the environment.  There is currently an annual transport
cost of approximately £19,009 per annum for pupils to travel to Dunbeg
Primary School on a council mini bus. Going forward, this cost would
continue to be incurred annually. 
8.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no
specific educational benefits as all schools implement Curriculum for Excellence
ensuring effective learning and teaching which is matched to the needs of children. 
Both Dunbeg and Achaleven are very remote rural schools. Each school is set within
a remote rural area (Scottish Government classification).  Children from Achaleven
area who would attend Dunbeg Primary School are benefitting from the broader rural
environment, whilst not moving their learning to a school that is completely different
to their home environment. High quality outdoor learning is currently provided at

Page 20

20 
Dunbeg Primary. The pupils would then be transitioning to Oban High School with an
established friendship group. 
In Dunbeg Primary School children are taught in classes composed of children from
more than one year group. Children benefit from being part of a social context in
which they can build relationships with different groups and individuals, develop
social skills, meet challenges and exercise responsibilities as members of a social
group. They are able to interact and socialise with groups of children of their own
gender, take part in team activities and move with their peers to secondary school. 
8.6  Summary
The majority of people who attended the Community Engagement event were in
favour of closing Achaleven Primary as a school. They also commented on the
potential for the school premises to be used as a community asset. 
The current capacity for Dunbeg Primary School is 51%, however, due to house
building within the catchment, there is expected to be a significant increase in the
school roll and therefore a significant increase in the occupancy rate of the school.
This is projected to be 72.4% by August 2023 and 90% by August 2030. The
additional annual cost to transport pupils to Dunbeg Primary school on a council mini
bus is approximately £19,009 per annum. Going forward, this cost would continue to
be incurred annually. 
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85 and this option would have no effect on the current
travel arrangements of staff and pupils. The closure of Achaleven Primary School
would therefore have a neutral effect on the environment. Dunbeg Primary currently
accommodates pupils from Achaleven School and pupil numbers travelling from the
current Achaleven catchment area are not projected to increase significantly.
However, Dunbeg Primary has limited capacity to continue to accommodate the
projected pupil numbers due to the projected increase in the roll through an increase
in pupils residing within the catchment area. 
On the basis, as detailed previously, that the school roll at Dunbeg Primary is
projected to increase significantly and therefore the school capacity rate will also
increase annually for the foreseeable future, the closure of Achaleven Primary
School and realignment of the Dunbeg Primary School catchment area to include the
current Achaleven Primary School catchment is not viewed as a reasonable option. 
9.  OPTION D: CLOSE ACHALEVEN PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR LOCHNELL PRIMARY SCHOOL TO INCLUDE THE
CURRENT ACHALEVEN PRIMARY SCHOOL CATCHMENT AREA 
9.1  Community Feedback
The majority of people who attended the Options Appraisal meeting were not in
favour of reopening Achaleven Primary as a school given the very low/no projected
pupil numbers. They commented that there were not enough children to support re-

Page 21

21 
opening the School. Additionally, with respect to very low/ non-existent numbers in
future school roll projections, the sustainability of the School did not support re-
opening of the School. Comments in relation to the closure of Achaleven Primary
School and attendance at Lochnell Primary School were generally positive:
‘I already send my children to Lochnell Primary School and transport is easy’ 
‘I would prefer that my child was able to walk or cycle to school but appreciate that in
a more rural setting, this isn’t always possible’ 
Community members commented on the school premises and potential for this to
become a community asset: 
‘The building to be used for a purpose to benefit the community for example a
community hub with a nursery and café.’ 
Community members discussed potentially pursuing options for use of the building
as a community hub. 
9.2  Pupil Numbers
Table 5: Schools Occupancy: 
Primary 2023/2024 2024/25
Lochnell
Approved
Capacity
147 147 
Lochnell
Projected
Roll 
116 114
Achaleven
Projected
Roll
1 0
Total Roll
Projection
117 114 
Occupancy 79.6% 77.6% 
Pupils from Achaleven Primary catchment area would attend Lochnell Primary
School. As there are currently no pupils attending Achaleven there is no projected
addition to school roll at Lochnell Primary School. The current occupancy rate for
Lochnell Primary School is 80%.   There is a projected roll of one pupil for Achaleven
Primary for August 2023, this would take the projected roll for Lochnell Primary to
117. 
9.3  Financial Information
An existing West Coast bus means that there would be no additional annual
transport costs. If Achaleven Primary School were to be closed it would generate
savings of £5,400 - the current annual cost of mothballing (2022/23) to the Council.

Page 22

22 
This includes electricity, heating oil, and ground maintenance but does not include
building maintenance and repair costs. 
9.4  Assessment of Rural Factors 
The reasons why the future of Achaleven Primary School is being reviewed are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Achaleven Primary School to increase. Achaleven Primary School is currently
mothballed and were there pupils they would be rezoned to other schools. To reopen
the school would not increase the pupil numbers.   
9.4.1  Community Impact
The community supported the proposed closure of the school with the building
and adjoining grounds being retained for community use where viable. All
people who attended the consultation stated that they would be in favour of
preliminary work to investigate whether the school building could be retained
for community use and not allowed to fall into further disrepair, as that would
adversely impact on the visual impact of the village. While it is accepted that
school closure may have an adverse effect on a community, a community hub
could be an asset to a community. However, as previously stated, Connel
Village Hall is situated 330 yards from Achaleven Primary School and is used
for village events.  If the Community wished to create a community hub, they
would require to find a mechanism to acquire the property from the Council
and deliver that aspiration. The buildings forming the school premises are
situated within walking distance of the village. If the local plans for the building
progress, this may have a positive impact on the sustainability of the village.
Formal closure of the school would mean that these plans could potentially be
progressed by the community. 
9.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Achaleven Primary to
Lochnell Primary is 3.6 miles via the A85 and the A828. Travel time is
approximately 8 minutes. The travel arrangements have been in place for 18
months. Travel is an accepted aspect of living in the Achaleven community.
This option would have no effect on the current travel arrangements of staff
and pupils. The closure of Achaleven Primary School, in terms of travel
would have a neutral effect on the environment.  There is currently no annual
transport cost for pupils to travel to Lochnell Primary School as it is part of an
existing West Coast Motors service bus and therefore would not incur
additional costs in the immediate future. 
9.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no

Page 23

23 
specific educational benefits as all schools implement Curriculum for Excellence
ensuring effective learning and teaching which is matched to the needs of children. 
Both Lochnell and Achaleven are very remote rural schools. Each school is set
within a remote rural area (Scottish Government classification).  Children from
Achaleven area who would attend Lochnell Primary School are benefitting from the
broader rural environment, whilst not moving their learning to a school that is
completely different to their home environment. High quality outdoor learning is
currently provided at Lochnell Primary. The pupils would then be transitioning to
Oban High School with an established friendship group. 
In Lochnell Primary School children are taught in classes composed of children from
more than one year group. Children benefit from being part of a social context in
which they can build relationships with different groups and individuals, develop
social skills, meet challenges and exercise responsibilities as members of a social
group. They are able to interact and socialise with groups of children of their own
gender, take part in team activities and move with their peers to secondary school. 
9.6  Summary
The majority of people who attended the Community Engagement event were in
favour of closing Achaleven Primary as a school. They also commented on the
potential for the school premises to be used as a community asset. 
Current capacity for Lochnell Primary School is 80%, with no significant increase to
the school roll predicted in forthcoming years. There is no additional annual cost to
transport pupils to Lochnell Primary school as this is part of an existing route and
wider contract with West Coast Motors and use of the existing West Coast Motors
service bus would not incur additional costs. 
The travel distance (sourced from Google maps) from Achaleven Primary to Lochnell
Primary is 3.6 miles via the A85 and the A828 and this option would have no effect
on the current travel arrangements of staff and pupils. The closure of Achaleven
Primary School would therefore have a neutral effect on the environment. Lochnell
Primary currently accommodates pupils from Achaleven Primary School’s catchment
area, and pupil numbers are not projected to increase significantly. Lochnell Primary
has capacity to continue to accommodate the projected pupil numbers. 
In Lochnell Primary School, children benefit from a very positive learning
environment with learning and teaching which is well matched to the needs of the
young people who attend the school. In addition there is a clear focus on nurturing
the health and wellbeing of pupils. 
This has been identified as a reasonable option for further consideration.

Page 24

24 
9.  OVERVIEW OF OPTIONS
Option Option Description Outcome
A Re-open Achaleven Primary School with
the existing catchment area
Not a reasonable option.
B Continued Mothballing of Achaleven
Primary School with the pupils zoned to
Dunbeg and Lochnell  Primary Schools 
Not a reasonable option.
C Close Achaleven Primary School and
realign the catchment area of Dunbeg
Primary School to include the current
catchment area for Achaleven Primary
School.
Not a reasonable option.
D Close Achaleven Primary School and
realign the catchment area of Lochnell
Primary School to include the current
catchment area for Achaleven Primary
School.
A reasonable option with
some representation that
the school becomes a
facility the community
can develop if viable. 
10.  DETAILED ANALYSIS OF REASONABLE OPTION: CLOSE ACHALEVEN
PRIMARY SCHOOL AND REALIGN THE CATCHMENT AREA FOR LOCHNELL
PRIMARY SCHOOL TO INCLUDE THE CURRENT ACHALEVEN CATCHMENT
AREA  
10.1 Pupil Projections 
Primary 2023/2024 2024/25
Lochnell
Approved
Capacity
147 147 
Lochnell
Projected
Roll 
116 114
Achaleven
Projected
Roll
1 0
Total Roll
Projection
117 114 
Occupancy 79.6% 77.6% 
10.2  Educational Benefits
This statement focusses on Lochnell Primary School which is one of the schools that
parents/carers within the Achaleven Catchment can currently choose to send their

Page 25

25 
child to, and the school which would subsume Achaleven’s current catchment area
as part of Option D. 
10.2.1   Learning and Teaching
The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to help
every child and young person to develop knowledge, skills and
attributes for success in learning, life and work. 
The school are committed to providing appropriate opportunities for the
development of pupils’ spiritual, moral, social and cultural values
through both the ethos and the curriculum.  This is undertaken in
partnership with parents/carers and takes account of the individual
needs of pupils and the views of parents/carers. 
The aim of Lochnell Primary School and Early Years is to ensure each
child feels safe and happy so that they may achieve their potential. To
do this, the school follow the principles of being Ready, Respectful and
Safe (RRS).  These principles sit alongside their core values which
were reviewed and refreshed in January 2020.  The core school values
are: Kind, ambitious, fun, inclusive and curious. 
The aims of Lochnell Primary are to: 
o Inspire curiosity and creativity through rich learning
experiences.
o Encourage ambition by opening minds, aiming high and
celebrating achievements.
o Develop kindness through an ethos of inclusion and
mutual respect.
o Enable appreciation and consideration of our local
community and the wider world.
o Create a calm, purposeful and fun learning environment
where learners feel valued.
o Continue to evaluate, evolve and excel! 
Children know that their views are sought, valued and acted upon. The
learning environment encourages high level of achievement, providing
a wide range of opportunities for children to achieve their full potential
within the four contexts of learning. 
In Lochnell Primary School children may be taught in classes
composed of children from more than one year group. Children benefit
from being part of a social context in which they can build relationships
with different groups and individuals, develop social skills, meet
challenges and exercise responsibilities as members of a social group.
They are able to interact and socialise with groups of children of

Page 26

26 
varying sizes and composition, take part in team activities and move
with their peers to secondary school. 
There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement
Framework priorities include raising attainment for all, and closing the
gap between the most and least disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. The general aim of the
school is to provide an atmosphere of mutual respect and collective
responsibility.  Pupils, parents/carers and staff all have an important
part to play in producing and sustaining this positive ethos.   
Lochnell Primary School welcomes and encourages diversity and
individuality, while emphasizing their common commitment to moral
values such as honesty, respect for others, compassion and justice. 
Fundamental principles of the school are that all who are involved in
the life of the school have the right to be respected as individuals and
carry the responsibility to act in a considerate and respectful manner
towards others.  The school are firmly committed to the elimination of
any form of discrimination on the grounds of race, religion, gender or
disability. 
Lochnell has a working partnership with the village church and enjoy
visits to church (virtual or in person) to celebrate special events
throughout the year.  The pupils also enjoy visits to the school and
early years setting by the local minister.  They welcome connections to
other faiths and have linked with members of different faiths to provide
a context for their curriculum and enhance understanding. Lochnell
School, its resources and activities provide a focal point for the
community.  The involvement of parents/carers and other members of
the community in school activities is highly valued and increases the
range of experiences on offer for learners. 
Parents are kept informed of school activities and the school are
currently reviewing how best to do this.  Parents/carers are always
welcome to call at the school for further information and/or to arrange
to see the Head Teacher. 
Having an early years setting alongside the school has improved
transition and liaison.  However, the school are careful to maintain links

Page 27

27 
with the other pre-5 groups in the area to ensure a smooth transition
process into P1 for all. 
Links with other Oban and Lorn Primary schools are strong and when
possible, the pupils enjoy activities throughout the year to share their
learning and skills. Active Schools provide many opportunities for the
pupils and there is an ongoing programme to train Young Leaders,
ensuring additional leadership opportunities within the school. 
Lochnell School has very strong links with Oban High and this makes
the transition from P7 to S1 smooth and productive, ensuring that all
pupils are well support as they move to High School. 
Both Lochnell and Achaleven are very remote rural schools. Each
school is set within a remote rural area (Scottish Government
classification).  Children from Achaleven area, who would attend
Lochnell Primary School would benefit from the broader rural
environment, whilst not moving their learning to a school that is
completely different to their home environment. 
10.2.2  Outcomes
Through the GIRFEC practice model, meeting the needs of every child
continues to be a priority and teachers carefully plan and assess to
ensure each child has the opportunity to reach their potential.  Careful
tracking and monitoring procedures are in place to evidence pupil
progress. This includes professional dialogue with teachers, learning
discussions with children, classroom observations, assessment and
looking at pupil work. Planning for Progress meetings are being further
strengthened. These discussions between home and school improve
parental engagement whilst focussing on next steps for learning.
Where appropriate, intervention is put in place, while working
effectively with other agencies and parents to ensure the needs of each
child are met. 
In the primary classes, standards of attainment have been maintained
over the last three years. Most children are achieving national
expectations in reading, writing, listening, talking and numeracy. 
10.2.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future.  Throughout the school
session there are opportunities for the children to take part in wider –
curricular activities and after school clubs.

Page 28

28 
The variety, frequency and nature of the clubs depends on the
availability of staff and senior pupils and parents to run and supervise
them.  More information is available from the school office. 
Educational visits are an important part of the learning process and it is
crucial to use our environment as a learning resource. The number and
scope of these visits is governed by our financial situation and the
opportunities available. Parents and carers help us supervise these
outings and we are grateful for the enthusiastic help. Groups from the
school compete in local festivals and competitions 
10.2.4  Environment for Learning
Lochnell Primary School is situated in the village of Benderloch on the
main Oban to Fort William road. The building is single storey and was
opened in 1992. The teaching bays in the original building are semi
open plan. The new extension teaching bays are open plan. The entire
building is well maintained and along with the surrounding scenery
provides attractive accommodation for the primary school. 
A joint school and community project was completed to provide and
maintain and all weather pitch adjacent to the school. The pitch is used
very well by the school every day. The community have access to the
pitch out with school times and the public can book it at the local
garage. 
The building has facilities for pupils and visitors with special access
needs. They enjoy good links with Oban High School as the associated
secondary school. Lochnell Primary has a Pre5 Unit within the school
for 3 and 4 year olds. 
10.3  Assessment of Rural Factors 
The reasons why the future of Achaleven Primary School is being
reviewed are stated at Section 2 of this report. There is currently no
expectation for the pupil numbers to increase at the School. Achaleven
Primary School is mothballed with no current pupils. Having considered
all the alternatives above, the option to close Achaleven Primary
School and realign the catchment area for Lochnell Primary School to
include the former Achaleven Primary School catchment area is
considered the most reasonable means to address the reasons
identified at Section 2 of this report. 
10.3.1  Community Impact
The community overwhelmingly supported closure of the school with
the suggestion that the building and adjoining grounds could potentially
be retained for community use. Within Achaleven there is a Village Hall
which houses community events. All people who attended the Options
Appraisal Meeting stated that if possible they would prefer to see the

Page 29

29 
school building retained for community use and not allowed to fall in to
further disrepair, as that would adversely impact on the community’s
access to the premises and the visual impact of the village. It is
accepted that a school closure may have an adverse effect on a
community. Formal closure of the school would mean that future plans
for the building could potentially be progressed by the community. 
10.3.2  Travel Arrangements
The travel distance (sourced from Google maps) from Achaleven
Primary to Lochnell Primary is 3.6 miles via the A85 and A828. Travel
time is approximately 8 minutes. The travel arrangements have been in
place for 18 months. Travel is an accepted aspect of living in the
Achaleven community. Pupils will travel on the existing West Coast
Motors service bus and eventually all the pupils will travel to Lochnell
Primary School. The environmental impact of travel will be minimal, as
these arrangements are currently in place due to the mothballing of
Achaleven Primary School. The closure of Achaleven Primary School,
in terms of travel, would have a neutral effect on the environment.
There is currently no additional annual transport cost of taking pupils to
Lochnell Primary School and the continued use of the existing West
Coast Motors service bus would mean there are no future cost
implications. 
10.4  Financial Impact
The main elements included within a school budget are Teacher employment
costs (ie basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure
incurred by the school (i.e. educational equipment, materials, staff travel,
etc.).  Teacher staffing budgets are calculated on an annual basis and within
the Primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of the pupils in each school.  When a school ceases to be operational
the Teacher staffing budget is adjusted (at the appropriate time), per
entitlement information from Education HR, with the staffing budget resulting
in a nil value.  As a result of the authority’s policy for no Teacher
redundancies it is presumed that the staff are deployed elsewhere within the
authority and therefore their salary costs still exist with an increase to the
receiving school’s budget.  This is also in line with the national priority of
maintaining teacher numbers.  This methodology also applies to the school’s
discretionary budget which again is formula based.  The budget of the
receiving school, in terms of any pupils being transferred, will have increased. 
The figures outlined below take account of the fact that the staffing and
discretionary budgets have been adjusted to nil.

Page 30

30 
The annual running costs during mothballing of Achaleven Primary School are
a total of £5,400. 
Annual savings generated through closing Achaleven Primary School would
be £5,400. 
The costs/savings outlined above assumes all revenue expenditure would
cease. This includes non-domestic rates, utility costs, insurances, etc.  If the
school was to be formally closed, this would allow the Council to take steps
towards selling the school to a third party or the local community. 
10.5  Environmental Impact
Currently some pupils travel to Lochnell Primary. However this option would
have a neutral environmental impact on the current position and would have
no impact on the current travel arrangements for staff and pupils. Eventually
all pupils will attend Lochnell Primary School, a relatively short journey. Travel
is an accepted aspect of rural life. 
13.  CONCLUSION
Four alternative options have been reviewed in considering the future of
Achaleven Primary School.  For each option, information was collated and
consideration was given to:
 Community feedback;
 Pupil numbers; 
 Financial Information;
 Assessment of rural factors, including community impact, economic impact
and travel arrangements, and
 Educational Benefits.
An authority that is contemplating a rural school closure proposal must satisfy
the preliminary requirements set out in Section 12A of the 2010 Act before
formulating a proposal. 
After consideration of the preliminary requirements, as set out in the Act, and
the options, and having regard to the specific reasons identified at Section 2 of
this report, closing Achaleven Primary School and realigning the catchment
area of Lochnell Primary School to include the current catchment area for
Achaleven Primary School is the most reasonable option in order to address
the underlying reasons for the possible proposal. 
Members are asked to:
 Note the outcome of this consideration of the preliminary requirements; and 
 Agree that Officers now formulate a draft closure proposal that will come
back to a future meeting of the Committee in August 2023 for approval by
Members which would subsequently trigger the formal consultation process
under the Schools (Consultation) (Scotland) Act 2010.

Page 31

31 
Appendix 1 
Appendix 2

Page 32

32 
Appendix 3: Floorplan Achaleven Primary School

Page 33

33 
Appendix 4: Floorplan Lochnell Primary School

Page 34

Appendix 5: Floorplan Dunbeg Primary School and ELC