Democracy Spraffa

Document Pack - HAC Committee - 26 February 2025

West Dunbartonshire Council · 26 February 2025
Back to Housing & Communities Committee — 26 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
Housing and Communities
Committee 
Date:  Wednesday, 26 February 2025
___________________________________________________________________ 
Time:  10:00 
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:  Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk           
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Housing and Communities Committee as detailed
above. 
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton G82 1QL. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT
Chief Executive 
Page 1

Page 2

Distribution:- 
Provost Karen Murray Conaghan
Councillor Ian Dickson 
Councillor Gurpreet Singh Johal (Chair)
Councillor David McBride
Councillor John Millar 
Councillor Lawrence O’Neill
Councillor Lauren Oxley 
Councillor Chris Pollock
Councillor Martin Rooney
Councillor William Rooney
Councillor Hazel Sorrell (Vice Chair)
Councillor Sophie Traynor 
All other Councillors for information 
Chief Executive
Chief Officer – Housing and Employability
Chief Officer – Resources 
Date issued: 13 February 2025 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site. 
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/ 
Page 2

Page 3

HOUSING AND COMMUNITIES COMMITTEE 
WEDNESDAY, 26 FEBRUARY 2025 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING  
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
4 RECORDING OF VOTES   
The Committee is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record. 
5 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
6 MINUTES OF PREVIOUS MEETING      7 - 14 
Submit for approval, as a correct record, the Minutes of Meeting of the
Housing and Communities Committee held on 20 November 2024. 
7 SCRUTINY REPORTS 
(a) POLICE SCRUTINY REPORT               15 - 25   
Submit report by the Divisional Commander, Police Scotland providing
Members with an update Quarter 4 on local policing in West Dunbartonshire. 
Page 3

Page 4

(b) FIRE AND RESCUE SCRUTINY REPORT            27 - 36                     
Submit report by the Local Senior Officer, Scottish Fire and Rescue Service
providing appropriate performance data measured against priorities in the
West Dunbartonshire Local Fire and Rescue Plan. 
8 TENANT PARTICIPATION SURVEY 2024            37 - 44 
Submit report by the Chief Officer - Housing and Employability providing the
results of a comprehensive Tenant Satisfaction Survey that has been carried
out, which will be reported to the Scottish Housing Regulator as part of our
2024/25 Scottish Social Housing Charter requirements. 
9 HOUSING EMERGENCY ACTION PLAN            45 - 79 
Submit report by the Chief Officer - Housing and Employability providing an
updating on the Housing Emergency Action Plan (HEDAP) which was
formulated to address the emergency following the Council’s housing
emergency declaration on 1st May 2024. 
10 “MORE THAN A ROOF,” WEST DUNBARTONSHIRE    81 - 142 
COUNCIL HOUSING SOLUTIONS STRATEGY, 2025-2028 
Submit report by the Chief Officer - Housing and Employability seeking
Member approval of  the  new  housing solutions strategy “More than a Roof”
2025 – 2028. This new strategy will succeed West Dunbartonshire’s Rapid
Rehousing Transition Plan (RRTP) strategy “Home at the Heart” as the key
strategic response to homelessness and housing access in West
Dunbartonshire. 
11 MORE HOMES WEST DUNBARTONSHIRE – WEST            143 - 153 
DUNBARTONSHIRE COUNCIL AFFORDABLE HOUSING
SUPPLY DELIVERY PROGRAMME   
Submit report by the Chief Officer - Housing and Employability providing an
update on progress with West Dunbartonshire’s More Homes Programme
which oversees the delivery of the Council’s new home building programme. 
12/ 
Page 4

Page 5

12 HOUSING REVENUE ACCOUNT (HRA) CAPITAL     155 -166 
BUDGETARY CONTROL REPORT TO 31 OCTOBER 
2024 (PERIOD 7)     
Submit report by the Chief Officer – Resources providing an update on the
HRA capital programme to 31 October 2024 (Period 7). 
13 HOUSING REVENUE ACCOUNT (HRA) BUDGETARY    167 - 177 
CONTROL REPORT TO 31 OCTOBER 2024 (PERIOD 7)   
Submit report by the Chief Officer – Resources advising of the 2024/2025
HRA revenue budget position on 31 October 2024 and the forecast position of
the HRA reserves as of 31 March 2025. 
14 GENERAL FUND HOUSING AND COMMUNITIES     179 - 189 
FINANCIAL REPORT 2024/25 AS AT PERIOD 7 
(31 OCTOBER 2024) 
Submit report by the Chief Officer – Resources providing an update on the 
financial performance to 31 October 2024 (Period 7) of General Fund 
Revenue services under the remit of the Housing and Communities 
Committee. 
______________________________________________________________ 
Page 5

Page 6

Page 6

Page 7

HOUSING AND COMMUNITIES COMMITTEE 
At a Hybrid Meeting of the Housing and Communities Committee held in the Civic
Space, 16 Church Street, Dumbarton on Wednesday, 20 November 2024 at 10.02
a.m. 
Present: Provost Karen Murray Conaghan and Councillors Ian Dickson,
Gurpreet Singh Johal, David McBride, Lauren Oxley, Chris
Pollock, Martin Rooney, Hazel Sorrell and Sophie Traynor. 
Attending: Peter Barry – Chief Officer, Housing and Employability; John
Kerr, Housing Development and Homelessness Manager;
Martin Feeney, Building Services Manager; Nicola Pettigrew,
Housing Operations Manager; Laurence Slavin – Chief Officer,
Resources; Michelle Lynn, Asset Manager; Michael McDougall,
Manager of Legal Services; and Nicola Moorcroft and Lynn
Straker, Committee Officers. 
Also attending: Divisional Commander Gary L’Anson and Chief Inspector
Kirsteen McLatchie, Police Scotland; Area Commander Joe
McKay and Station Commander Rob Tayor, Argyll and Bute,
East and West Dunbartonshire, Scottish Fire and Rescue
Service. 
Apologies: Apologies for absence were intimated on behalf of Councillors
John Millar and Lawrence O’Neill. 
Councillor Gurpreet Singh Johal in the Chair 
STATEMENT BY CHAIR – AUDIO STREAMING 
Councillor Gurpreet Singh Johal, Chair, advised that the meeting was being audio
streamed and broadcast live to the internet and would be available for playback. 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in the item of business on the
agenda. 
RECORDING OF VOTES 
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record.
Item 6
Page 7

Page 8

OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
VALEDICTORY
CHIEF INSPECTOR KIRSTEEN MCLATCHIE - POLICE SCOTLAND 
Councillor Singh Johal advised that this was the last meeting Chief Inspector
Kirsteen McLatchie, Police Scotland would be attending. On behalf of all Members of
the Committee, he thanked Chief Inspector McLatchie for all her work for West
Dunbartonshire and wished her well in her future role. 
In response, Chief Inspector McLatchie noted thanks to all and advised that Chief
Inspector Simon Shanks will be her replacement within West Dunbartonshire going
forward. 
MINUTES OF PREVIOUS MEETING 
The Minutes of the Meeting of the Housing and Communities Committee held on 21
August 2024 were submitted and approved as a correct record subject to all
references to Chief Superintendent being amended to Chief Inspector. 
SCRUTINY REPORTS 
(a)  POLICE SCRUTINY REPORT 
A report was submitted by the Divisional Commander, Police Scotland
providing Members with an update on local policing in West Dunbartonshire. 
After discussion and having heard the Divisional Commander and the Chief
Inspector, in further explanation and in answer to Members’ questions, the
Committee agreed to note the update on policing in West Dunbartonshire. 
(b)  FIRE AND RESCUE SCRUTINY REPORT 
A report was submitted by the Local Senior Officer, Scottish Fire and Rescue
Service providing appropriate performance data measured against priorities in
the West Dunbartonshire Local Fire and Rescue Plan. 
After discussion and having heard the Area Commander and the Station
Commander in further explanation and in answer to Members’ questions, the
Committee agreed to note the update on the Local Fire and Rescue Plan in
West Dunbartonshire. 
Page 8

Page 9

HOUSING AND EMPLOYABILITY DELIVERY PLAN 2024/25 MID-YEAR
PROGRESS REPORT 
A report was submitted by Chief Officer – Housing and Employability providing an
update on progress of the Housing and Employability Delivery Plan 2024/25. 
After discussion and having heard the Chief Officer – Housing and Employability in
further explanation and in answer to Members’ questions, the Committee agreed to
note the progress achieved. 
‘MORE HOMES WEST DUNBARTONSHIRE’ – STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) 2025/26 – 2029/30 
A report was submitted by the Chief Officer – Housing and Employability seeking
approval for the More Homes West Dunbartonshire Strategic Housing Investment
Plan (SHIP) for 2025/26 – 2029/30 which requires to be submitted to the Scottish
Government. 
After discussion and having heard the Chief Officer – Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed:- 
(1) the draft SHIP 2025/26 - 2029/30 as appended to the report, designed to
continue the delivery of an ambitious programme of new affordable homes in
compliance with the West Dunbartonshire Local Housing Strategy 2022 -2027
(Approved November 2021); 
(2) to note the impact of the Affordable Housing Supply Programme financial
challenges and the mitigation measures being taken to maintain delivery of
new affordable housing to meet identified need; and 
(3) to delegate authority to the Chief Officer – Housing and Employability to
implement the Strategic Housing Investment Plan in partnership with relevant
stakeholders. 
‘MORE HOMES WEST DUNBARTONSHIRE’ – WEST DUNBARTONSHIRE
COUNCIL AFFORDABLE HOUSING SUPPLY DELIVERY PROGRAMME 
A report was submitted by the Chief Officer – Housing and Employability updating on
the progress of West Dunbartonshire’s More Homes Programme which oversees the
delivery of the Council’s new home building programme.  
After discussion and having heard the Chief Officer – Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed:- 
(1) to note the content of the report and the progress made to date in the delivery
of the Council’s More Homes West Dunbartonshire approach, including the
Page 9

Page 10

first handovers of new homes at the zero carbon Clydebank East
development, which represents the 500th new build the Council has
developed under the current More Homes Programme; 
(2) to approve the updated estimated costs for O’Hare (Bonhill Gap site)
development noted in paragraph 4.4 of the report and to authorise the Chief
Officer – Regulatory and Regeneration to conclude the award of the contract
up to the updated estimated costs for the development of the new homes at
the O’Hare site; 
(3) to note the revised Resource Planning Assumption (RPA) following the
allocation of an additional £309k to support acquisitions related to minimising
the use of temporary accommodation referenced at paragraphs 4.5 to 4.8 of
the report; and 
(4) to note the increased Affordable Housing Supply grant benchmark levels,
following a review undertaken by the Scottish Government, highlighted at
paragraph 4.9 of the report. 
WEST DUNBARTONSHIRE – EMPTY HOMES STRATEGY 2024-2029 
A report was submitted by the Chief Officer – Housing and Employability seeking
approval of the new Empty Homes Strategy 2024 -2029. 
After discussion and having heard the Chief Officer – Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed:- 
(1) to approve the revised Empty Homes Strategy 2024-2029; 
(2) to approve the target to return 125 homes back into use over the period of the
strategy; and 
(3) to note the feedback from the Scottish Housing Minister as follows: ‘80% of
the £40 million will be allocated to the five local authorities with sustained
temporary accommodation pressures in both 2024-25 and 2025-26, to
properly test the departure from the usual practice of distributing funding
across all 32 authorities. However, there will be the opportunity to reconsider
the allocation to the other 27 local authorities for 2025-26, which will be led by
the SDG and that the Committee write to COSLA Leaders, COSLA Housing
Spokesperson and request that when considering the 2025/26 allocation of
the £40m that 80% goes to the 27 local authorities and that 20% goes to the
five Local Authorities that had received the higher allocation last year. 
Page 10

Page 11

HOUSING EMERGENCY ACTION PLAN 
A report was submitted by the Chief Officer – Housing and Employability providing
an updating on the Housing Emergency Action Plan (HEDAP) which was formulated
to address the emergency following the Council’s housing emergency declaration on
1st May 2024. 
After discussion and having heard the Chief Officer - Housing and Employability and
the Housing Development and Homelessness Manager in further explanation and in
answer to Members’ questions, the Committee agreed:- 
(1) to note the progress to date and the implementation of the key actions of the
Housing Emergency Declaration Action Plan as summarised in paragraphs
4.1 – 4.6 of the report and in the action plan update within Appendix 1 of the
report; and 
(2) to note the intention to hold a Housing Summit in early 2025 and that the
Chief Officer – Housing and Employability will continue to bring an update
report to future meetings of the Housing and Communities Committee
regarding the Housing Emergency declaration. 
HOUSING REPAIRS POLICY 
A report was submitted by the Chief Officer – Housing and Employability seeking
approval for the introduction of a new West Dunbartonshire Housing Repairs Policy,
which has been developed in partnership with Council tenants. 
After discussion and having heard the Chief Officer – Housing and Employability and
the Building Services Manager in further explanation and in answer to Members’
questions, the Committee agreed:- 
(1) to approve the revised Repairs Policy attached as Appendix 1 to the report;
and 
(2) to invite the Chief Officer – Housing and Employability to take appropriate
actions to ensure the policy is implemented immediately. 
SCOTTISH SOCIAL HOUSING CHARTER ANNUAL BENCHMARKING AND 
MID-YEAR PROGRESS REPORT 
A report was submitted by the Chief Officer – Housing and Employability providing
benchmarking information relating to 2023/24 and a mid-year update in terms
performance, against the Scottish Social Housing Charter indicators and meeting the
requirements of the Scottish Housing Regulator’s Regulatory Framework. 
After discussion and having heard the Chief Officer – Housing and Employability and
the Housing Operations Manager, in further explanation and in answer to Members’
questions, the Committee agreed:-
Page 11

Page 12

(1) to note the content of this report recognising how the Council performed
compared to peers during 2023/24 and mid-year progress in terms of meeting
the outcomes of the Scottish Social Housing Charter; 
(2) to note that following the approval of the Annual Assurance Statement by the
Committee on 21 August 2024 that, this has now been submitted to the
Scottish Housing Regulator as per regulatory requirements; 
(3) to note that the annual Charter Performance Report for 2023/24 has now
been published and a summary would be provided to all tenants with the
winter edition of the Housing News; and 
(4) that a full annual progress report on the Scottish Social Housing Charter and
Regulatory Framework will be submitted to the August 2025 meeting of the
Housing and Communities Committee. 
‘INVOLVING YOU TO IMPROVE HOUSING SERVICES’ - WEST
DUNBARTONSHIRE COUNCIL’S TENANT PARTICIPATION STRATEGY
2025-2028 
A report was submitted by the Chief Officer – Housing and Employability highlighting
statutory obligations in relation to tenant participation and seeking approval for the
new Tenant Participation Strategy entitled ‘Involving You to Improve Housing
Services’ covering the period 2025-2028. 
After discussion and having heard the Chief Officer – Housing and Employability in
further explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the progress and achievements made in relation to the implementation
of the previous Tenant Participation Strategy 2021- 2024; and 
(2) to approve the draft West Dunbartonshire Tenant Participation Strategy 2025-
2028 and associated action plan. 
HOUSING AND COMMUNITIES BUILDING SERVICES UPDATE 
A report was submitted by the Chief Officer – Housing and Employability advising of
changes to Building Services establishment and delivery model and seeking
approval to continue with procurement and tender processes. 
After discussion and having heard the Chief Officer – Housing and Employability and
the Building Services Manager in further explanation and in answer to Members’
questions, the Committee agreed:- 
(1) to note the contents of the report; 
(2) to approve the procurement processes to tender the requirements listed within
the table in paragraph 4.6 of the report; and
Page 12

Page 13

(3) to delegate authority to the Chief Officer – Regulatory and Regeneration to
award contracts to successful bidders 
HOUSING REVENUE ACCOUNT (HRA) BUDGETARY CONTROL REPORT TO 31
AUGUST 24 (PERIOD 5) 
A report was submitted by the Chief Officer – Resources providing advising of the
2024/2025 HRA revenue budget position on 31 August 2024 and the forecast HRA
reserves position as of 31 March 2025. 
After discussion and having heard the Chief Officer – Housing and Employability in
further explanation, the Committee agreed:- 
(1) to note the HRA revenue account currently forecasts an adverse variance of
£2.174m. If required, the adverse variance would be offset by using HRA
reserves of £0.968m and a General Fund reserve contribution of £1.205m; 
(2) to note that the HRA will be expected to develop a repayment plan to
reimburse the General Fund for any contribution that the General Fund makes
towards a HRA deficit and note that the HRA will need to develop a plan to
replenish HRA reserves to the HRA prudential target; 
(3) to note that work will continue to identify efficiencies across all areas of the
HRA revenue account budget, to minimise the adverse variance, including
reviewing loan charges as highlighted in paragraph 4.5 of the report; and 
(4) to note that there is limited scope to further reduce spend in 2024/2025
beyond the significant actions set out in the report. 
GENERAL FUND HOUSING AND COMMUNITIES FINANCIAL REPORT 2024/25
AS AT 31 AUGUST 2024 (PERIOD 5) 
A report was submitted by the Chief Officer – Resources providing an update
financial performance to 31 August 2024 (Period 5) of General Fund Revenue
services under the remit of the Housing and Communities Committee. 
After discussion and having heard the Chief Officer – Housing and Employability in
further explanation, the Committee agreed:- 
(1) to note the contents of the report showing the revenue budget forecast to
underspend against budget by £0.029m (0.9 %) at the year-end; and 
(2) to note the progress on efficiencies incorporated into budgets for 2024/25. 
Page 13

Page 14

HOUSING AND COMMUNITIES CAPITAL MONITORING REPORT TO 31
AUGUST 24 (PERIOD 5) 
A report was submitted by the Chief Officer – Resources providing an update on the
HRA capital programme to 31 August 2024. 
After discussion and having heard the Chief Officer – Housing and Employability, in
further explanation the Committee agreed:- 
(1) to note the current position of the 2024/2025 HRA capital budget and the HRA
capital plan; 
(2) to note that in year financial performance is monitored against a 2024/2025
capital expenditure budget of £73.664m and a 2024/2025 capital income
budget of £10.003m, a one-year borrowing requirement of £63.661m; 
(3) to note that project life performance is monitored against a five-year project
life expenditure budget of £319.738m and a project life income budget of
£54.577m, a five-year borrowing requirement of £265.161m; 
(4) to note that there were six projects reporting off-track, with an anticipated
over/under spend against 2024/2025 budgets, with a forecast net overspend
of £0.334m in 2024/2025; and 
(5) to note that all projects are currently on-track to achieve the planned
completion dates and to deliver within the respective five-year project life
budgets. 
The meeting closed at 11.52 a.m. 
Page 14

Page 15

OFFICIAL
OFFICIAL     
West Dunbartonshire
Performance Summary Report 
Reporting Period: April 24 to December 24
Total Crime 28 Crimes
Incidents
20,258
Recorded
Dishonesty Crimes
1380
Domestic Abuse Inc 
1066
+1.1% -4.9% +10.5%
+5.2% +25% -28.6%*
Road Deaths &
Serious Injuries
20
-10.7%*
Sexual Crime
175
-1143*PYTD +8*PYTD, +84*5YR AVG -71*PYTD, +199*5YR AVG +101*PYTD, +79*5YR AVG
+53*PYTD, +164*5YR AVG +35*PYTD, +24*5YR AVG -8*on PYTD  -328*PYTD
Violent Crime
1075 
Missing People
261 Counter Terrorism
+24*PYTD
+10.1%*
-33*PYTD, -35*5YR AVG
Common Assault
726
-26.2%
Housebreaking
93 
Disorder Complaints
2,731
The National Terrorism Threat level is 
SUBSTANTIAL
This means that an attack is likely. 
*PYTD = Previous Year to Date
*5YR = 5 year average 
+0.4%
-5.3%
Item 7a
Page 15

Page 16

OFFICIAL
OFFICIAL  
SECTION PAGE NUMBER 
Introduction 2 
Executive Summary 3
Demand Analysis 4
Acquisitive Crime 5
Public Protection 6
Road Safety 7
Serious Organized Crime 8
Violence  9
Antisocial Behaviour 10
Public Confidence - Complaints & Allegations 11
Introduction 
I am pleased to present this performance summary report to the West Dunbartonshire Housing
Committee for its information and consideration. The Reporting Period for this report is cumulative for
Quarters 1 to 3 of 2024/25, with available figures being shown from 1st April 2024 through to 31st
December 2024. 
Please note that all data included in this report are management information and not official statistics.
All data are sourced from Police Scotland internal systems and are correct as of date of publication.
Unless stated otherwise numerical comparisons are against the previous year to date and the previous
five year average for the same data period specified. 
Crimes and offences are grouped under recognised categories for statistical purposes. The Scottish
Government defines these categories, as follows: 
Group 1 - Non Sexual Crimes of Violence  Group 6 - Miscellaneous Offences 
Group 2 - Sexual Crimes  Group 7 - Offences relating to motor vehicles 
Group 3 - Crimes of Dishonesty  PYTD  - Previous Year to Date 
Group 4 - Fire Raising, Malicious Mischief  CYTD - Current Year to Date 
Group 5 - Other (pro activity) Crimes   
Page 16

Page 17

OFFICIAL
OFFICIAL 
PRIORITY
AREA EXECUTIVE SUMMARY 
Acquisitive
Crime   
At the end of December 2024, acquisitive crimes have reduced by 4.9% from
1451 to 1380 crimes compared to the same period last year. Increases in both
shoplifting and mainly online social engineering fraud crime has been offset by
continued reductions in theft by housebreaking at residential properties and also
common thefts. 
Public
Protection   
Group 2 sexual crimes have seen an increase of 25% with 175 crimes recorded
compared to 140 at the end of December last year. This is largely due to a rise
in number of rape crimes and sexual assaults recorded rising from 27 to 45 and
50 to 57 crimes respectively. These increases are due to an increase in non-
recent reporting with just over half of all crimes being non-recent in nature.
Increases in such offences are always concerning but with over 50% of reports
relating to historical incidents, it evidences an increased confidence in Police
Scotland to make such reports after sometimes considerable passages of time. 
Road Safety
& Road Crime
The number of fatal road traffic collisions within West Dunbartonshire remains
unchanged at the end of Qtr. 3, with only 1 collision recorded in the current
period. 
Road traffic collisions involving serious injuries have reduced from 27 to 19, and
collisions involving slight injuries have also decreased from 23 to 18. 
Serious
Organised
Crime 
At the end of December 2024, drugs supply crimes show a substantial increase
of 24.56% from 57 to 71 crimes while possession charges continue to see a
reduction from 437 to 354.  
Across Argyll & West Dunbartonshire 16 persons linked to serious and organised
crime (SAOC) have been arrested and £2,595,658 seized under the Proceeds
of Crime Act 2002 (POCA). 
Violence &
ASB 
At the end of December 2024, Group 1 crimes of violence have increased slightly
with 1075 crimes compared to 1022 the previous year to date, while anti-social
behaviour (ASB) related crimes have also risen from 871 to 999 due to increases
in breach of the peace/threatening abusive behaviour (+49) and consuming
alcohol within a public place (where appropriate bye laws exist (+54).   
1. Acquisitive Crime
2. Public Protection
3. Road Safety & Road Crime
4. Serious Organised Crime   
5. Violence & Anti-social behaviour 
WEST DUNBARTONSHIRE POLICING PRIORITIES 2023-2026
Page 17

Page 18

OFFICIAL
OFFICIAL 
CRIME PYTD CYTD INCIDENTS PYTD CYTD
Total Crimes &
Offences 7728 7756 Total number of
incidents 21,401 20,258
DEMAND ANALYSIS - * PYTD - PREVIOUS YEAR TO DATE CYTD - CURRENT YEAR TO DATE
* *
*
*
The total volume of crimes and offences recorded within West Dunbartonshire has seen a
marginal increase when compared to the previous year while the current figure is also slightly
above the previous 5-year average (+5.4%). Crimes of violence (+5.2%), sexual crimes (+25%)
and anti-social offences (+14.7%) continue to see an upward trend compared to the previous
year. Crimes of violence and sexual crime are both currently above the previous 5-year average
which is in line with the post-covid trajectory. 
Crimes against society such as drug and weapons offences have reduced marginally by 1.1%
with the current figure (1154) also 5% below the previous 5-year average (1214). Both acquisitive
crime and crimes relating to damage and reckless behaviour have also seen a reduction on last
year from 1451 to 1380 (-71) and 731 to 696 (-35) crimes respectively. 
Page 18

Page 19

OFFICIAL
OFFICIAL   
ACQUISITIVE CRIME
Shoplifting crimes continue to see an increase compared to the previous year from 534
to 600 and remains above the previous 5-year average. Year to date, 51 more
shoplifting crimes have been detected. This is in line with the national picture across
the rest of the Force. 
At the end of December 2024, thefts of motor vehicles have increased by 20.9% from
47 to 56 crimes, while the current figure is also 21.7% above the previous 5-year
average (46). Approximately 32% of crimes related to taking/driving a vehicle without
consent of the owner, while a further 12 crimes involved thefts of motorcycles. The
detection rate has increased from 46.5% to 50%. 
There continues to be an increase in fraud crimes at the end of Qtr. 3 from 152 to 188
crimes, which is above the 5-year average of 147. The increase is largely due to a rise
in social engineering frauds (+9), bank account takeovers (+7) and frauds involving
stolen credit/debit cards (+4). The detection rate for fraud crime is currently at 12.2%,
which is a decrease from 23.7% PYTD. Many perpetrators of fraud offences generally
are based out with the UK. 
Common thefts have seen a 12.1% reduction compared to the PYTD down from 380
to 334 crimes remaining fractionally above the 5-year average of 329. The detection
rate has remained fairly consistent at 23.7% compared to 26.8% the previous year. 
The reduction by 4.9% from 1451 to 1380 crimes compared to the same period last year is an
encouraging statistic when compared to the overall increase at the end of Q2 when measured
against the previous year Q2 figure. We have increased proactive patrols of hotspots while
working with other Policing Divisions and National Specialist Departments to detect and disrupt
individuals and serious and organised crime groups involved in the theft of motor vehicles.
We have established a short-life working group led by the CID involving the National Crime
Unit to drill down into the fraud stats to better understand the potential areas where
improvement can be made, ideally reducing fraud occurring however when it does, increasing
the detection rate.    
Another very significant habitual shoplifter was remanded for a period of imprisonment during
Q3. 
Our continued activity around diversion via the arrest referral scheme and other partnership
work with the ADP & Partners continues to seek redirection from criminality for both adult &
youth repeat offenders.  
Page 19

Page 20

OFFICIAL
OFFICIAL   
The volume of non-recent sexual crimes being reported remains high, some of this is a result of
increased engagement with victims and growing confidence in the officers in these specialist roles.
We are further developing the work of The Safeguarding Team, mentioned in the Q2 summary,
by establishing strong working links between these Officers and the Preventions Team who are
trained in various crime prevention techniques and resolves. We are developing a menu of
preventative measures available including alarms, surveys, home security measures and also the
offer of referral to addiction services as appropriate. We are looking to break the cycle of violence
that has become normalised behaviour.          
Although an increase is never welcomed, the volume of domestic incidents had risen 15% at the
end of Q2 against the PYTD and has now decreased to 10.5% measured against the PYTD.
Missing persons figures have risen which relates directly to a specific group of youths repeatedly
going missing. We have held professional multi-agency meeting with our SW colleagues to bring
this figure down while continuing to support and protect the youths involved.   
At the end of December 2024, Group 2 crimes have increased by 25% (+35) compared to the same period
last year. The increase is largely due to a rise in rape offences from 27 to 45 crimes, while sexual assaults
have also risen slightly from 50 to 57 (+7) year on year. 
Approximately 83% of rape crimes occurred in a private place and 83% were committed by persons known
to the victim. Similarly, around 62% of sexual assaults also occurred in a private place with 66% committed
by persons known to the victim. Approximately 58% of rape crimes during this reporting period relate to
non-recent reports, which is an increase from 41% PYTD. The detection rate for rape crime is currently
at 46.7%, while the detection rate for sexual assaults has decreased from 60% to 40.4% year on year.
Detection rates are impacted by the volume of non-recent reports. 
Crimes relating to indecent images/communications have seen marginal change compared to last year
with the majority of crimes being committed by strangers via online platforms. 
The number of domestic abuse incidents has increased by 10.5% compared to PYTD from 965 to 1066,
while the number of crimes recorded have also risen from 568 to 791 crimes as at the end of Qtr. 3. There
has also been a 1.9% increase in the crime/incident conversion rate from 48.7% to 50.6%.  
A total of 261 missing person reports have been recorded by the end of December 2024, which is an
increase of 10.1% from 237 last year. 
PUBLIC PROTECTION
Page 20

Page 21

OFFICIAL
OFFICIAL 
At the end of Qtr. 3, the number of fatal road collisions in West Dunbartonshire, is unchanged from
the position in the same period last year (n=1). Both serious and slight injuries have reduced
18.99% from 27 to 19 (-8) and 21.74% from 23 to 18 (-5) respectively. 
Offences relating to motor vehicles have also seen a reduction of 3.9% from 2153 to 2070 (-83),
largely due to a decrease in speeding offences (-102) and unlawful use of motor vehicle offences
such as using a motor vehicle without a test certificate and insurance offences (-125). Crimes such
as drink/drug driving offences (+49) and vehicle defect offences (+94) have both seen an increase
compared to PYTD. 
Road Traffic Casualties 2023/24 2024/25 
Number of persons killed on our roads 1 1
Number of persons seriously injured 27 19
Number of persons slightly injured 23 18
Number of children seriously injured 0 0
Inspector Fiona Davidson took up post as Road Policing Inspector for the area at the start of
Q3, Fiona has previously held a number of posts across L Division and is very aware of the
important role this specialist department has in keeping people safe on our roads. 
The volume of high visibility traffic patrols continues to influence driver behaviour which is
evidenced in the decrease in speeding offences while showing an increase in detections for
both drink/drug driving and vehicle defects. Targeted, intelligence led policing is removing
these drivers from the roads rendering them safer for the vast majority of drivers operating
within the law. 
Pro-active social media messaging and a visible policing patrol matrix has assisted the crash
statistics to remain well below the PYTD through the more challenging weather at the year
end. 
The Partnership Approach to Road Safety Group, chaired by Police Scotland, is now
reviewing all fatal crash locations in partnership with the Local Authority and Roads Authority
to ascertain what, if any, improvements can be introduced to improve the safety of the road
network and best prevent further accidents at the same location.          
The established partnership with The Institute of Advanced Motorists (IAM) and SFRS is
proving both popular and beneficial providing training resources by way of educational films,
access to resources and the opportunity to attend advanced driver training.           
ROAD SAFETY AND ROAD CRIME
Page 21

Page 22

OFFICIAL
OFFICIAL 
Across Argyll & West Dunbartonshire, 16 persons linked to serious and organised crime have been
arrested and £2,595,658 has been seized under POCA since 1st April 2024.  
At the end of December 2024, drug supply charges have increased from 57 to 71 crimes and is also
slightly above the previous 5-year average (63.6). Drug possession charges have seen a reduction
of 19% from 437 to 354. 
Our Serious & Organised Crime Team continue to target those groups and individuals involved
in the supply of controlled drugs into the communities. Their work, which is often protracted
requiring weeks or months of work, is having the desired outcome. At the end of Q2 the
detections for drug supply offences sat at 9.3% above the PYTD, that figure is now 24.56%
above the PYTD. In addition to this substantial rise, further persons linked to serious and
organised crime (SAOC) have been arrested and now a total of £2,595,658 has been seized
under the Proceeds of Crime Act 2002 (POCA).   
We have engaged the services of the Lived Experience Speakers from the National Violence
Reduction Unit who have delivered inputs to the pupils at The Vale of Leven Academy and are
now also scheduled to do likewise at Our Lady & St Patricks. The feedback from pupils and staff
has been very encouraging, the inputs are covering gang culture, drugs, misogynistic attitudes
and also the importance of having a personal exit strategy to remove yourself from potentially
harmful situations.     
We are sitting on the Drug Death Review group to better understand how, where and when
police and / or partners can positively impact on a person’s lifestyle and signpost that individual
to the most appropriate service to provide assistance, guidance and support to break their
dependency on illegal drugs.     
We are now referring people who find themselves in police custody due to addiction issues to
support services for both alcohol and drug dependency in an attempt to remove them from the
criminal justice process.    
SERIOUS & ORGANISED CRIME
Page 22

Page 23

OFFICIAL
OFFICIAL   
VIOLENCE & ANTI-SOCIAL BEHAVIOUR
The Area Commander is continually looking at analytical products to best deploy resources to
be at the right place at the right time to address violence and ASB. The rise in levels of violence
being at 5.2% at the conclusion of this reporting period is a substantial drop from the 10.3%
rise against PYTD at the end of Q2. Although a rise, the curve is flattening, and continued
efforts are expected to cause this increase on the PYTD to narrow or actually reduce. 
Our previously discussed scrutiny around robberies, has almost removed the increase against
the PYTD figure completely, we are now a single crime above the PYTD figure at the end of
Q3. That compares to a 40% rise at the end of Q2 on the PYTD. 
The importance of our continued work around the referral of people in police custody to
addictions and support services for alcohol and drugs is further evidenced by the fact that nearly
50% of persons involved in serious assault crimes were under the influence.              
Levels of violence in West Dunbartonshire have increased by 5.2% from 1022 to 1075 (+53)
crimes. Just over half of all crimes took place in a private place.  Furthermore, 38% of public
space crimes were committed by persons known to the victim. 
Robberies have increased marginally from 27 to 28 crimes, 18 occurred in a public place (12 on
a public street and 6 at commercial premises). The remaining 10 crimes occurred within
residential premises. Fifteen robberies were committed by persons known to the victim and 13
were committed by strangers. The detection rate for robbery has increased from 48.1% to 64.3%,
which equates to an additional 5 crimes being detected year on year. 
Serious assaults have also seen a slight increase from 54 to 59 crimes with crimes being largely
spilt 60/40 in terms of public/private space and 65% were committed by persons known to the
victim (4 were domestic related). Nearly half of all crimes were committed with the victim and/or
offender being under the influence of alcohol/drugs or both and 53% of crimes involved the use
of a weapon. The detection rate has reduced marginally from 75.9% to 72.9%.
Page 23

Page 24

OFFICIAL
OFFICIAL 
Common assaults have increased marginally by 1.1% from 718 to 726 and are currently above
the 5-year average (642), while common assaults on police and emergency workers have also
risen marginally by 3.6% compared to PYTD. Around 56% of common assaults occurred in
private space settings and in 44% of public space crimes, offenders were known to victims. The
detection rate for common assaults overall has remained fairly consistent from 56.4% to 57.3%. 
Across the recording period the number of ASB related calls to Police Scotland has reduced by
approx. 10.1% compared to last year. Anti-Social related offences (Group 6) have increased by
14.7% with 999 crimes recorded compared to 871 PYTD, however the current figure remains
7.7% below the previous 5-year average (1082.4). 
VIOLENCE & ANTI-SOCIAL BEHAVIOUR 
We are providing support and identifying any additional training needs for our officers that are
victims of violence. Being a Police Officer is demanding and can be dangerous, but we
continue to strive to reduce physical assaults on officers and staff, it is not acceptable to
assault any emergency worker. 
The further reduction in ASB calls in this reporting period is particularly pleasing considering it
includes Bonfire Night and both the Christmas and New Year periods when licensed premises
are busier and social gatherings peak. 
The build up to 5th November and the following days are historically busy for us and SFRS.
Great credit is due to the work of ourselves and partners in SFRS and West Dunbartonshire
Council in the partnership approach to the Bonfire period this year. Substantial early
partnership engagement ensured a relatively peaceful period with minor ASB issues arising
across the authority. West Dunbartonshire ASB Team worked tirelessly to remove materials
from various areas assisted by police. The date itself saw a very effective and efficient multi-
agency operational order being utilised with a rapid response to issues as they arose
minimising any negative impact on the community.       
Page 24

Page 25

OFFICIAL
OFFICIAL 
PUBLIC CONFIDENCE: COMPLAINTS & USER SATISFACTION
Overall satisfaction with Police Scotland
User Satisfaction results show that locally, public confidence levels remain high within Argyll and
West Dunbartonshire with overall satisfaction levels at 70.1%, which remains in line with the
position in 2022/23. 
During November 2024, Police Scotland were in the top five for highest volume of 999 calls
received in the UK with 86.10% of calls answered within 10 secs. Police Scotland achieved
an average speed of answer of 9.51 seconds, within the target answering time of 10 seconds.               
Again, during December 2024, Police Scotland were again in the top five for highest volume
of 999 calls received with 88% of calls answered within 10 secs. Police Scotland achieved an
average speed of answer of 8.72 seconds, which was within the target answering time of 10
seconds.     
Chief Inspector Simon Shanks took
over as Area Commander from Kirsten
McLatchie during this reporting period
with the responsibility for all local
policing activity in West
Dunbartonshire. 
Police Scotland produced the results
of the National Staff Survey to The
Divisional Senior Leadership team who
are currently working on an action plan
to consider any changes to working
practices to address any issues raised
in the survey to improve employee
satisfaction. 
User Satisfaction results show that
locally, public confidence levels remain
high within Argyll and West
Dunbartonshire with overall satisfaction
levels at 70%, which remains in line
with the position in 2022/23. 
Total of 
428
responses
70%
Satisfied/Very
Satisfied
Page 25

Page 26

Page 26

Page 27

West Dunbartonshire Performance Report
Q3 - 1st October 2024 - 31st December 2024
Annick
Item 7b
Page 27

Page 28

West Dunbartonshire Performance Report
Table of Contents
Local Fire and Rescue Service Plan Priorities 3
WestDunbartonshire Activity Summary   4
Domestic Safety - Accidental Dwelling Fires 5
Domestic Safety - Accidental Dwelling Fire Casualties 6
Unintentional Injury and Harm                                                                                             7
Deliberate Fire Setting                                                                                                      8
Non-Domestic Fire Safety                                                                 9
Unwanted Fire Alarm Signals                                                      10
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                2Page 28

Page 29

6 2 0 12 0 1
5 1 0 29 3 14
10 1 1 14 3 4
3 0 1 12 0 3
9 2 2 12 0 1
0 0 2 8 1 8
33 6 6 87 7 31
-3% 200% 100% 78% -42% -26%
8% 100% -24% 10% 14% -31%
6% 86% 21% 31% 23% 7%
Year on Year Change
3 Year Average Change
5 Year Average Change
Clydebank Central
Clydebank Waterfront
Dumbarton
Kilpatrick
Leven
Lomond
Total Incidents
Local Fire and Rescue Service Plan Priorities
Accidental
Dwelling
Fires
Accidental
Dwelling Fire
Casualties
Non-
Domestic   
Fire Safety
Unwanted
Fire Alarm
Signals
Unintentional
Injury and Harm
Deliberate
Fire Setting
The Local Fire and Rescue Service Plan has been developed to set out the priorities and objectives within West
Dunbartonshire and allows our local authority partners to scrutinise the performance outcomes of these priorities.             
We will continue to work closely with our partners in West Dunbartonshire to ensure we are all “Working Together for a
Safer Scotland” through targeting risks to our communities at a local level.
The plan has been developed to complement key partnership activity embedded across West Dunbartonshire`sCommunity
Plan and associated Delivery and Thematic plans. Through partnership working we will seek to deliver continuous
improvement in our performance and effective service delivery in our area of operations.
The Local Fire and Rescue Plan for West Dunbartonshireidentified six areas for demand reduction and is subject to regular
monitoring and reporting through the Police & Fire and Rescue Committee. A summary of the priorities and current activity
is detailed below with further detail and analysis contained within this performance report.
About the statistics within this report 
The activity totals and other statistics quoted within this report are published in the interests of transparency and
openness. They are provisional in nature and subject to change as a result of ongoing quality assurance and review.
Because all statistics quoted are provisional there may be a difference in the period totals quoted in our reports after
local publication which result from revisions or additions to the data in our systems. The Scottish Government publishes
official statistics each year which allow for comparisons to be made over longer periods of time.
* Regarding 3 Year Average and 5 Year Average percentages. These values indicate the percentage change         
between the current 3 or 5 year average and the previous 3 or 5 year average. The value does not reflect the difference
between the current quarter against the 3 or 5 year average.
Activity levels have reduced by more than 5%
Activity levels have reduced by up to 5%
Activity levels have increased overall
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                3Page 29

Page 30

West Dunbartonshire Activity Summary
2020/21 2021/22 2022/23 2023/24 2024/25
161 110 80 99 140
56 80 95 71 69
192 207 208 115 112
409 397 383 285 321Total Incidents
All Special Services
All False Alarms
All Fires
0
100
200
300
400
500
2020/21 2021/22 2022/23 2023/24 2024/25
Total Incidents All Fires All Special Services All False Alarms
31%
20%
49%
44%
21%
35%
All Fires All Special Services All False Alarms
Incidents by Classification
Annual Average
5 Year Average
19.00%
12.46%
12.15%
11.21%
9.66%
7.17%
6.85%
3.12%
2.80%
2.18%
1.87%
1.87%
1.56%
1.25%
0.93%
Refuse Fire
False Alarm (Good Intent)
False Alarm (Dwelling)
Dwelling Fire
False Alarm (UFAS)
Outdoor Fire
Special Service - Effecting entry/exit
Special Service - Assist other…
Vehicle Fire
Other Building Fire
Special Service - No action (not…
Special Service - Flooding
Special Service - Hazardous…
Special Service - Lift Release
Special Service - Removal of…
Top 15 Incident Types by % of Total Incidents
West Dunbartonshire OperationalTrends
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
140
fires
primary &
secondary
special
services69
false
alarms
112
-3%
totalnumber of
incidents
321 13%
41%
fire & non-fire
casualties
12 0%
economiccost of
ufas incidents
£61,070
Activityby Time of Day
-3%
(41) (-2) (-3)
(36) (0)
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                4Page 30

Page 31

-3% 8% 6%
Main Source of Ignition
Year on
Year
3 Year
Average*
5 Year
Average*
Domestic Safety - Accidental Dwelling Fires Domesti
Detection Present
84.8% 67.9%
Detection Actuated
Calls Made via Linked Alarms
90.9%
19
6 4 2 2
Cooking applianceElectricity Supply Other/Other
Domestic
Appliance/
Heating
Equipment
Not known Smoking Related/
Matches/ Candles
24
27
18
34 33
2020/21 2021/22 2022/23 2023/24 2024/25
42.4% 12.1%
36.4% 78.8%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage Only Nofire Damage
Alcohol/Drug Impairment
18.2%
Distraction
27.3%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
18.2%
Clydebank
Waterfront
15.2% 30.3%
Dumbarton
Kilpatrick Leven Lomond
9.1% 27.3% 0.0%
Clydebank
Central
Performance Summary
AccidentalDwelling Fires to Date
Main Source of Ignition
Accidental Dwelling Fires by Time of Day
Severity of Accidental Dwelling Fires
Human Factors
Automatic Detection & Actuation
AccidentalDwelling Fires Activity by Ward (% share)
(6) (5) (10)
(3) (9) (0)
(14) (4)
(12) (26)
(9) (6)
(28) (19)
(30)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                5Page 31

Page 32

200% 100% 86%
Year on
Year
3 Year
Average*
5 Year
Average*
Domestic Safety - Accidental Dwelling Fire Casualties
Overcome by
gas, smoke or
toxic fumes; 50.0%
16.7%
16.7%
0.0%
0.0%
Other
Burns - slight
0 0 0
3
00 0
2
1
0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
50%
Female
50%
2
1
3
2
6
2020/21 2021/22 2022/23 2023/24 2024/25
Clydebank
Central
33.3%
Clydebank
Waterfront
16.7% 16.7%
Dumbarton
Kilpatrick Leven Lomond
0.0% 33.3% 0.0%
Unintentional Injury or
01 02 03
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
First Aid at Scene
Hospital -Serious Injuries
Hospital-Slight Injuries
Fatality
Performance Summary Fire Casualties by Time of Day
AccidentalDwelling Fire Casualties Year to Date
Nature of Injury
Extent of Harm
Age / Gender Profile
Accidental Dwelling Fire Casualties by Ward (% share)
(2) (1) (1)
(0) (2) (0)
(1) (5)
(0) (0)
50.0%
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                6Page 32

Page 33

100% -24% 21%
Year on
Year
3 Year
Average*
5 Year
Average*
Unintentional Injury or Harm
Not known
Head injury
Collapse
Cuts/Lacerati
ons
Other medical
condition 33.3%
16.7%
16.7%
16.7%
16.7%
0.0%
0 0 0
2
00 0
1
3
0
0 - 9 10 - 19 20 - 49 50 - 79 80+
Male
33%
Female
67%
Clydebank
Central
Clydebank
Waterfront
0.0% 16.7%
Dumbarton
Kilpatrick Leven Lomond
16.7% 33.3% 33.3%
0.0%
Road Traffic Collision Water Rescue
Assisting Other Agencies
16.7% 0.0%
83.3%
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00
First Aid at Scene
Hospital -Serious Injuries
Hospital -Slight Injuries
16.7%
0.0% 16.7%
Fatality
66.7%
7
11
7
3
6
2020/21 2021/22 2022/23 2023/24 2024/25
Deliberate
Performance Summary
Non-Fire Casualties Year to Date
Non-Fire Casualties by Time of Day
Nature of Injury
Extent of Harm
Non-FireEmergency Activity
Age / Gender Profile
Non-FireCasualties by Ward (% share)
(0) (0) (1)
(1) (2) (2)
()(1)
(4) (1)
(1) (0)
(5)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                7Page 33

Page 34

78% 10% 31%
Year on
Year
3 Year
Average*
5 Year
Average*
Deliberate Fire Setting
Clydebank
Central
Clydebank
Waterfront
33.3% 16.1%
Dumbarton
Kilpatrick Leven Lomond
13.8% 13.8% 9.2%
13.8%
117
70
45 49
87
2020/21 2021/22 2022/23 2023/24 2024/25
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
17.1%
11.4%
13.3%
10.2%
11.5%
82.9%
88.6%
86.7%
89.8%
88.5%
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
Primary Secondary
3
0
7
0
Other Buildings
Dwellings
Vehicles
Other Primary
55
22
Refuse
Other Secondary
409 397 383
285 321
97 62 39 44 77
0
200
400
600
0
200
400
600
2020/21 2021/22 2022/23 2023/24 2024/25
All Incidents Deliberate Secondary Fires
Non
Performance Summary
Deliberate Fires Year to Date
Deliberate Firesby Time of Day
Deliberate Firesby Classification
Primary Fire Ratio by Activity Type
Secondary Fire Ratio by Activity Type
Deliberate Fires Compared to Operational Activity
Deliberate Fires by Ward (% share)
(12) (29) (14)
(12) (12) (8)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                8Page 34

Page 35

-42% 14% 23%
Year on
Year
3 Year
Average*
5 Year
Average*
Non Domestic Fire Safety
9
4
6
12
7
2020/21 2021/22 2022/23 2023/24 2024/25
Clydebank
Central
Clydebank
Waterfront
42.9% 42.9%
Dumbarton
Kilpatrick Leven Lomond
0.0% 0.0% 14.3%
0.0%
71%
0%
29%
Accidental Deliberate Not Known
57.1% 0.0%
28.6% 71.4%
No FirefightingAction Direct Firefighting
Heat/SmokeDamage No FireDamage
2
1
1
1
1
1
Hospitals and medical care,
Hospital
Retail, Large supermarket
Retail, Department Store
Food and Drink, Pub/wine
bar/bar
Retail, Shopping Centre
Food and Drink, Takeaway,
fast food
Unwanted
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
2223 00Performance Summary
Non-Domestic Fires Year to Date
Non-Domestic Firesby Time of Day
Non-Domestic Fires by Nature of Origin
Non-Domestic Fires by Ward (% share)
Severity of Non-DomesticFires
Non-Domestic Fires by Premises Type
(0) (3) (3)
(0) (0) (1)
(4) (0)
(2) (5)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                9Page 35

Page 36

-26% -31% 7%
Year on
Year
3 Year
Average*
5 Year
Average*
Unwanted Fire Alarm Signals
113 123
136
42 31
2020/21 2021/22 2022/23 2023/24 2024/25
Clydebank Clydebank
Waterfront
45.2% 12.9%
Dumbarton
Kilpatrick Leven Lomond
9.7% 3.2% 25.8%
3.2%
12
11
3
3
2
Residential Home,
Nursing/Care/ Other
Residential, Sheltered Housing -
not self contained/…
Hospitals and medical care,
Hospital
Other Residential, Hotel/motel
Warehouses and bulk storage,
Warehouse/ Industrial
Manufacturing, Engineering
Public admin, security and
safety/ Entertainment and
culture, Community
centre/Village or Parish Hall
10%
UFAS Percentage Against all Incidents
UFAS Percentage Against all False Alarms
28%
Human Influenceand Alarm Activations
35.5%
0.0
1.0
Mon Tue Wed Thu Fri Sat Sun
01 0203
04
05
06
07
08
09
101112131415
16
17
18
19
20
21
22 23 00
Performance Summary
Unwanted Fire Alarm Signals Year to Date
Unwanted Fire AlarmSignals by Ward (% share)
Unwanted Fire Alarm Signals by Time of Day
Unwanted Fire Alarm Signals- Top 5 Premises
Unwanted Fire Alarm Signals Activity Ratios
Average UnwantedFire Alarm Signals per Day
(1) (14) (4)
(3) (1) (8)
Scottish Fire and Rescue Service | Local Fire and Rescue Plan Progress Report for West Dunbartonshire                                10Page 36

Page 37

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Housing and Employability
Housing and Communities Committee - 26 February 2025
___________________________________________________________________
Subject: Tenant Satisfaction Survey 2024
1. Purpose
1.1 This purpose of this report is to provide members of the Housing and
Communities Committee with the results of a comprehensive Tenant
Satisfaction Survey that has been carried out, which will be reported to the
Scottish Housing Regulator as part of our 2024/25 Scottish Social Housing
Charter requirements.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the contents of this report and recognise the significant increase in
the level of Tenant Satisfaction across all areas of the housing and
homelessness services from the previous survey carried out in 2022;
(ii) Acknowledge the efforts of staff across housing and homelessness
services and tenant representatives in achieving such positive
tenant satisfaction results;
(iii) Note that this satisfaction data will be reported to the Scottish
Housing Regulator (SHR) as part of our Annual Return on the
Charter (ARC);
(iv) Note and invite the Chief Officer, Housing and Employability to
ensure the tenants spending priorities sourced through the survey
feedback noted at 4.28 of this report is reflected in the delivery of
investment priorities over the next 3-year period;
(v) Agree that these key findings are shared with the West
Dunbartonshire Tenants and Residents Organisation (WDTRO),
Scrutiny Panel and tenants more widely via the spring edition of
Housing News; and
(vi) Note that all service areas across housing will be tasked to use the
full survey report as part of our wider assessment of performance
which will inform actions that form part of our broader Charter
Improvement Plan.
3. Background
3.1 The Scottish Social Housing Charter (SSHC) requires all social landlords to have
robust and up to date customer satisfaction information and to report this
annually to the Scottish Housing Regulator via the Annual Return on the Charter.
Item 8
Page 37

Page 38

3.2 In order to meet this obligation, it was agreed by the Housing, Environment and
Economic Development Committee in November 2013 that a comprehensive
tenant satisfaction survey be carried out on an annual basis for the duration of
the first 4 full years of the Charter, when it would then be reviewed by the
Scottish Housing Regulator and Scottish Government.
Following this review, it was subsequently agreed in partnership with tenants
and residents’ organisations that a comprehensive tenant satisfaction survey
would be carried out every second year.
4. Main Issues
4.1 The main aim of the Tenant Satisfaction Survey was to seek tenant views in
relation to the housing landlord services provided by the Council to identify
areas where the service can be improved.
4.2 The survey was designed to meet the guidance provided by the Scottish
Housing Regulator regarding assessing tenant satisfaction.  As such, the
survey was designed to ensure that:
 The questions asked covered the key tenant satisfaction Charter Indicators
in the way which is prescribed.
 The sample was designed to meet the guidance provided by the Scottish
Housing Regulator which states that as a minimum, data accurate to +/-5%
should be achieved and the sample should be designed to be
representative of the organisation’s tenant population.
4.3 The IPSOS MORI guidance prepared on behalf of the Regulator debates the
use of a range of different methodologies for carrying out large scale tenant
satisfaction surveys, including postal, online, telephone and face to face
survey methods.
4.4 Given the requirements and the desire to obtain detail around reasons for any
reported dissatisfaction with services, it was decided that the tenant survey
was carried out utilising an interviewer led face to face interview methodology.
The main benefits of this were:
 Utilising an interviewer led methodology allows us to maximise the
response rate;
 This methodology is an inclusive methodology and allows interviewers to
ensure that, for example, elderly or those with a disability or literacy
problems can be included in the process; and
 This methodology facilitates a high quality of survey output as it allows the
interviewer to build up a rapport with the participant ensuring that survey
questions can be explained thoroughly and that the questionnaire is
answered in full.
4.5 A total of 500 interviews were carried out between 9 September and 21 October
2024, providing data accurate to +/-3.4%. Analysis of the participant profile
3.3
Page 38

Page 39

shows that the survey sample is broadly representative of our tenant base by
geographic location, property size and property type. There was therefore no
requirement for the survey data to be weighted and the data should be
considered the most robust available in relation to outlining tenant views.
4.6 The table below shows the results for the six Charter Indicators that this
survey is used as the source for and outlines our performance trend since
2019, highlights the change in satisfaction levels since the last survey carried
out in 2022 and compares our results with the 2023/24 Scottish average
figure for local authorities for these key measurements:
West Dunbartonshire Council Tenant Satisfaction Survey 2024
Indicator 2019 2022 2024 Change
2023/24
LA
average
ARC 1: % of tenants satisfied with the overall service
provided by their landlord 78.5% 61.3% 87.0% +25.7% 79.5%
ARC 2: % of tenants who feel their landlord is good at
keeping them informed about services and decisions 85.7% 75.8% 86.8% +11.0% 82.9%
ARC 5: % of tenants satisfied with opportunities to
participate in their landlord’s decision making 83.9% 69.2% 87.2% +18.0% 80.9%
ARC 7: % of existing tenants satisfied with the quality
of their home 76.6% 62.7% 87.8% +25.1% 79.1%
ARC 13: % of tenants satisfied with the management
of the neighbourhood they live in 78.5% 62.7% 86.0% +23.3% 78.9%
ARC 25: % of tenants who feel that the rent for their
property represents good value for money 76.8% 60.5% 85.6% +25.1% 79.1%
Overall Satisfaction
4.7 The survey opened by asking respondents how satisfied or dissatisfied they
were with the overall service provided by West Dunbartonshire Council as
their landlord. A significant majority of tenants (87%) are satisfied with the
housing service overall, the Scottish local authority average for this
measure is 79.5%. Only 4% are dissatisfied, down from 28% who reported
being dissatisfied in 2022.
4.8 Analysis of the responses for overall tenant satisfaction by housing type
illustrates some degree of variation, e.g. 92.3% satisfied for tenants living
in semi-detached (houses and bungalows) to 85.1% satisfaction for those
living in multi-storey flats.
4.9 There is some degree of variation in satisfaction with the overall service
provided by geographic location, with the highest satisfaction being
reported by residents in Alexandria (90.5% satisfied), followed by
Dumbarton (86.2% satisfied) and Clydebank (85.4% satisfied).
Tenant Participation and Engagement
4.10 In 2024, 86.8% of tenants said their landlord was good at keeping them
informed about services and decisions, the Scottish local authority
Page 39

Page 40

average for this measure is 82.9%. Only 3.4% said that the Council was
poor on this measure, down from 24% in 2022.
4.11 Most tenants (87.2%) are satisfied with the opportunities to participate in
decision making, The Scottish local authority average for this measure is
80.9%. Only 1.4% are dissatisfied (11.4% of tenants are neutral on this
question answering ‘neither-nor’).
4.12 Around three in four tenants (74.6%) said they were not interested in
becoming involved in the decision making of their landlord, whilst 8.6% said
they were already involved. As to the other barriers to getting involved, work
commitments (7.1% of all responses), childcare commitments (4.5%) and
tenants’ health/disability (4.3%) are the three main reasons given by tenants
for not wishing to get involved in the housing service’s decision making.
Housing Quality
4.13 Most tenants (87.2%) are satisfied with housing quality, the Scottish local
authority average for this measure is 80.9%. Only 2.4% of tenants
reported being dissatisfied, down from 27% in 2022.
4.14 There is some degree of variation in satisfaction with housing quality by
property type with the highest satisfaction found amongst tenants living in
semi-detached properties (97.5%) and terraced houses (91.7%), and
lower satisfaction rates reported by those living in multi-storey flats
(87.8%) and those living in tenements (83.3%).
4.15 Most tenants (91.8%) are satisfied that the Council provides them with a
home that is safe and secure, with a lower majority of 62.8% stating that
they find it easy or fairly easy to afford to heat their home, with 8.2%
saying this is difficult.
4.16 One of ten tenants (10.0%) report being aware of damp and mould in their
property, 88.6% are not aware and 1.4% don’t know. Of those tenants who
are aware of damp and mould, most (76%) have reported this issue to the
Council whereas 24% have not. Amongst those tenants that have reported
damp and mould, 57.9% are waiting on the Council to address the issue
whilst 42.1% say that the damp and mould problem has returned.
4.17 Tenants are who are aware of damp and mould are less likely to be satisfied
with the quality of their home (68.0% satisfied) when compared to tenants
who are not aware of this type of problem (90% satisfied).
Neighbourhood management
4.18 Almost nine in ten tenants (86%) are satisfied with neighbourhood
management, the Scottish local authority average for this measure is
78.9%. Only 2.4% of tenants reported being dissatisfied, down from 27%
in 2022.
Page 40

Page 41

4.19 Satisfaction with neighbourhood management varies by area with 94.0%
of tenants living in Dumbarton satisfied, whilst the figure for Alexandria is
88.3% and for Clydebank is 81.0%.
Value for Money
4.20    Almost nine in ten tenants (85.6%) feel that the rent for their property
represents good value for money, the Scottish local authority average for this
measure is 79.1%. Only 2.6% say that the rent that they pay is poor value for
money, down from 15% in 2022 (11.8% answered ‘neither good nor poor’
value).
4.21 In relation to property type, tenants living in semi-detached homes (97.4%)
and 4-in-a-block properties (86.6%) are the most likely to say their rent
represents good value for money, with those the least likely to say so being
tenants living in multi-storey flats (82.4%) and those living in tenements
(78.8%).
4.22 Rent value for money by tenant profile shows that amongst the most positive
tenants on this measure are retired tenants (95.1% say rent is good value),
single person households (87.8%) and homes that do not include children
(86.9%). Amongst the least positive tenants are those with children in home
(82.8% say rent is good value), tenants who are aged 16 to 34 (82.4%) and
those classed as other not working (75.5%).
4.23 Tenants who said that rent was poor value for money (2.6%) or neither good
nor poor value (11.8%) were asked to say how value for money could be
improved and the results of this enquiry show that internal (e.g.
Kitchens/bathrooms) property improvements (28.0% of all comments) and
external (e.g.; windows/roofs) upgrades (21.3%) are the two main value for
money improvements. A lower proportion (19%) stated that reducing the
annual rent increase would be their preference.
4.24 Tenant perceptions of rent affordability (based on the responses of those who
pay full or part rent) shows that on average, most tenants (66.2%) said that
rent was very or fairly easy to afford.
Repairs service
4.25 The satisfaction data relating to repairs for our ARC submission is sourced via
the existing exit surveys (as per the technical guidance). However, we also
use the opportunity in this representative survey to ask tenants about their
satisfaction with the repairs service and the results are outlined below:
West Dunbartonshire Council Tenant Satisfaction Survey 2024
Indicator 2019 2022 2024 Change 2023/24
LA average
% of tenants satisfied with the repairs
and maintenance service 74.6% 67.7% 90.2% +22.5% 86.7%
Data from service exit surveys and not the comprehensive Tenant Satisfaction Survey is used to report performance
for ARC Indicator 12
Page 41

Page 42

4.26 For tenants whose homes have been repaired in the last year, 90.2% are
satisfied with the last repair whilst 4.9% are dissatisfied. In 2022, 67.7% of
tenants were satisfied with their last property repair, whilst the Scottish
average figure for local authorities is 86.7% satisfied. This increase in the
level of satisfaction with the repairs service is broadly reflected in the existing
exit surveys carried out in real time.
4.27 The comprehensive survey provided the opportunity to ask tenants about their
satisfaction with different elements of the repairs service. Again, feedback is
positive, with all elements of the service having a satisfaction level of over
85% (the highest being 91.5% of tenants saying that are satisfied that they
can report a repair easily, whilst the lowest is 86.6% of tenants saying they
are satisfied with the time between a repair and the repair being completed).
Spending priorities
4.28 The survey highlighted the fact that cost pressures exist and asked tenants to
outline what their most important spending priorities for the future were within
this context. Feedback from this question overwhelmingly shows that the two
top spending priorities for tenants are:
 A responsive and high-quality repair service; and
 Building new Council homes.
There is low support from tenants for priority spending in areas such as:
 Environmental improvement works (bin areas/paths);
 Garden tidy schemes; and
 Open space maintenance
Summary and Improvement actions
4.29 Tenant satisfaction with the Council’s housing service has improved
substantially since the last survey carried out in 2022, with all the ARC
indicators reporting significantly higher satisfaction levels and all now
higher than the LA average reported in 2023/24.
4.30 The design of the survey meant that any tenants who expressed
dissatisfaction were asked to expand about the reasons for this. Tenants who
were dissatisfied with the service overall or who answered ‘neither satisfied
nor dissatisfied’ were asked what improvements were needed to provide a
better housing service. The three main improvements requested by this
minority of tenants (12.4%) are to:
 Upgrade the inside of the home (30.8% of tenant comments).
 Upgrade the outside of the home (19.2% of tenant comments).
 Improve the repair service (13.5% of tenant comments).
Page 42

Page 43

4.31 All service areas across housing will be tasked to use the full survey report as
part of our wider assessment of performance which will inform actions that
form part of our broader Charter Improvement Plan.
5. People Implications
5.1 Developing appropriate service responses to inform our broader Charter
Improvement Plan will be managed from within existing staffing resources.
6. Financial and Procurement Implications
6.1 There are no financial and procurement implications.  Any improvement
actions will be resourced within existing resource allocation and budget.
7. Risk Analysis
7.1 There is a risk that failure to have a comprehensive approach toward Customer
Satisfaction and toward benchmarking as part of our wider response to the
Scottish Social Housing Charter, would attract an adverse reaction from the
Scottish Housing Regulator.
8 Environmental Sustainability
8.1  The delivery of our housing maintenance programme is part of our current
and future approach to strategic housing asset management will continue to
prioritise a ‘zero carbon’ approach to decision making and deliverability and
this will be done the aims of the Housing Asset Management Strategy and the
Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 The proposals do not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
10. Consultation
10.1    The findings from the tenant satisfaction survey will be presented to tenant
representatives and to tenants and staff more broadly.
11. Strategic Assessment
11.1 The proposals contained in this report directly address all the Council’s
strategic priorities. The investment in, and provision of attractive affordable
housing will also indirectly support the objective of economic growth and
employability through supporting employment and improving place
attractiveness.
Page 43

Page 44

Peter Barry
Chief Officer Housing and Employability
Date:  31 January 2025
__________________________________________________________________
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness,
telephone: 07793717981, email: John.Kerr@west-
dunbarton.gov.uk 
Stefan Kristmanns, Senior Housing Development Officer,
Housing Development and Homelessness Team, Housing
and Employability, email: stefan.kristamanns@west-
dunbarton.gov.uk
Appendices: None
Background Papers: WDC Tenant Satisfaction Survey report 2024
Wards Affected: All
Page 44

Page 45

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Housing and Employability
Housing and Communities Committee - 26 February 2025
___________________________________________________________________
Subject:     West Dunbartonshire Housing Emergency Declaration Action Plan
1. Purpose
1.1 The purpose of this report is to provide members with an update on the Housing
Emergency Declaration Action Plan (HEDAP) which was formulated to address
the emergency following the Council’s housing emergency declaration on 1st May
2024.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the progress to date and the implementation of the key actions of the
Housing Emergency Declaration Action Plan as summarised in section
4.1 – 4.6 of this report and in the action plan update within Appendix 1 of
this report;
(ii) Note the Chief Officer, Housing and Employability will provide a verbal
summary of the Housing Summit held on the 10th February and future
actions, and 
(iii) Note the Chief Officer, Housing and Employability will continue to bring an
update report to future Housing and Communities committee meetings
regarding the housing emergency declaration.
3. Background
3.1 On the 1st  May 2024 Housing and Communities Committee unanimously agreed
to declare a Housing Emergency in West Dunbartonshire. The reasons behind
the motion being raised was due to the extreme pressures facing housing and
homelessness service in meeting statutory duties.
3.2 This was despite positive achievements of the service to help manage the acute
housing need in West Dunbartonshire including the following:
 262 households prevented from experiencing homelessness,
 Progress in reducing the number of empty homes (council voids); and
 The construction of new council homes at the following development sites
Clydebank East, Mount Pleasant, Pappert and Gilmour Avenue.
Item 9
Page 45

Page 46

3.3 Despite this, housing demand has increased rather the expected reduction and
therefore and the following metrics highlight the pressures on the housing and
homelessness systems within West Dunbartonshire.
 Over five thousand households on the Council’s housing waiting lists,
 274 households in temporary accommodation awaiting an offer of
permanent housing, of those households eighty-nine have children within
them, and
 the anticipation of more than 1100 new homeless assessments to be made
during the 2024/25 reporting period.
3.4 As reported previously to committee the Council has been unable to fulfil all our
statutory duties under homelessness legislation and has incurred sixty-eight
breaches of the Unsuitable Accommodation Order (UAO) following 274
households being placed in Bed & Breakfast Accommodation during 2023/24.
3.5 The increased supply of new social homes is the key element to help address the
demand pressures, The funding cut to the wider Scottish Government’s
Affordable Housing Supply Programme funding of around 24% in 2024/25,
contributed to the Housing Emergency Declaration.
3.6 West Dunbartonshire Council were the fifth local authority to declare a housing
emergency following declarations made in Argyll and Bute, Edinburgh, Glasgow,
and Fife. Since the West Dunbartonshire declaration, a further eight local
authorities have followed suit and made a housing emergency declaration (South
Lanarkshire, West Lothian, Angus, Scottish Borders, Dumfries and Galloway,
Aberdeen, East Renfrewshire and East Lothian). Therefore 13 of 32 Scottish local
authorities have declared housing emergencies, including four of the six housing
stock transfer authorities who do not fulfil a landlord role.
3.6 Significantly on the 15th of May 2024, the Scottish Government declared a
National Housing Emergency in the Scottish Parliament although the
implications of this are not known at the time of writing.
4. Main Issues
4.1 The action plan has four main themes they are as follows:
 Theme 1 - Deliver and maintain More Homes - West Dunbartonshire
approach to the delivery of affordable housing,
 Theme 2 - Make Best Use of Existing Stock,
 Theme 3 - Enhancing Housing Access and the prevention of
homelessness, and
 Theme 4 - Strengthen the Financial viability and capacity of the Housing
Revenue Account and associated Housing and Homelessness budgets.
4.2 There have been five Project Board meetings in total since the declaration.  The
project board agreed further progress will be made via existing governance
arrangements and reported to the Housing Emergency Project Board.  To date
there has been progress on all the 61 actions, with nearly half either being fully
completed or at least 50% complete. 
Page 46

Page 47

4.3 To assist with further progress a Housing Summit was held on 10th February
2025 gathering over eighty key stakeholders with an aim to work on solutions
to help end the emergency but also improve housing options long term within
West Dunbartonshire Council. The Housing Summit aimed to extend the
range of agencies with an active focus on the housing emergency, including
homelessness prevention and increasing the supply of new homes.  The
Chief Officer, Housing and Employability will provide a verbal summary of the
event and actions which will be taken forward as a result of the summit.
4.4 A full progress report is attached as Appendix 1 of this report and some
highlights are summarised in the sections below: - 
Deliver and maintain More Homes - West Dunbartonshire approach to the
delivery of affordable housing
4.5 The Housing and Communities Committee Convenor wrote to the Housing
Minister requesting the reinstatement of the funding cut to the Affordable
Housing Supply Programme funding.  While we await the full details of the
Scottish Government Budget the draft announcements seem to indicate that
this request will be met, and additional funding will be available to the delivery
of new homes through the Affordable Housing Supply Programme.  The
Council will receive notification of their Resource Planning Allocation in March
2025.
The Council supported by tenant prioritisation has continued to deliver much
needed new homes and is currently on site in a number of development sites
across the local authority area (Clydebank East, Gilmour Avenue, Pappert and
Mount Pleasant), the delivery of these new homes is supported by The
Council’s buyback scheme targeting addressing housing need in West
Dunbartonshire.
Make Best Use of Existing Stock
4.6 There has been positive progress around void performance within the Council’s
housing stock and in partnership with others we are working to reduce the
delays caused with energy supply issues in Council void homes.  A review has
begun of all Council leased properties to ensure best use of stock.  Further
work has taken place around maximising use of Homeswapper to meet
housing needs.  The new repairs policy has now been agreed and to be rolled
out from 1st April 2025. 
Enhancing Housing Access and the prevention of homelessness
4.7 In partnership with the Violence Against Women Partnership a refreshed
approach has been delivered to assist with preventing negative housing
situations including a refreshed housing pathway for WDC tenants who flee
domestic violence.  Progress made around a public awareness campaign on
homelessness and significant progress has been made around actions to
reduce children in temporary accommodation.
Strengthen the Financial viability and capacity of the Housing Revenue
Account (HRA) and associated Housing and Homelessness budgets
Page 47

Page 48

4.8 A number of actions are being taken forward through the Housing Emergency
Project Board and the HRA Value for Money group which now meets on a
weekly basis to help strengthen the financial health of the Housing Revenue
Account.  Council Officers are also part of a national conversation with the
Scottish Government, COSLA (Convention of Scottish Local Authorities) and
ALACHO (Association of Chief Housing Officers) to investigate the possibility
of HRA debt relief to enable local authorities to build or acquire more social
rented homes. 
4.9 We continue to monitor the key performance indicators developed to help
monitor the progress made through the action plan which will signify an end to
the current emergency declaration.  Progress against these will be reported to
the May meeting of the Housing and Communities Committee
5. People Implications
5.1 Initial analysis of the action plan do not indicate any people implications.
However, many of the actions involved are additional tasks not within current
remits therefore may lead to additional staffing resources which we would seek
for approval at futures committees if required.
6. Financial and Procurement Implications
6.1 The Housing Emergency Declaration Action Plan (HEDAP) will need to be
considered within the context existing resources available to West
Dunbartonshire Council across both the General Fund and Housing Revenue
Account (HRA). There is currently no additional Grant or Subsidy funding
available to Councils because of declaring a Housing Emergency.
6.2 The Housing Emergency Project Board will consider how existing resources
can be utilised to ensure delivery of the HEDAP. This will include a review of
Core Budgets and any Temporary Funding Sources which may be utilised.
6.3 If we are unable to increase supply and reduce demand will lead to continued
pressures on temporary accommodation and ultimately Bed & breakfast use
which has financial implications. Any funding reviews and subsequent
implications would be brought to future committees. 
6.4 There are no procurement implications to note.
7. Risk Analysis
7.1 Regular breaches of statutory homelessness duties partly triggered the
declaration of the Housing Emergency, and it is highly probable these will
continue without focussed, cross Council and Partnership action led through
the Housing Emergency Project Board.
7.2 The Council is also likely to experience significant legal, regulatory, and
reputational risk due to shortages of housing supply and related services.
Mitigation of these risks are included within the HEDAP, and these will be
managed through the Housing Emergency Project Board.
Page 48

Page 49

8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 An EIA has been carried out and there are no negative equalities impacts due to
this update.  A separate EIA screening will be conducted for any policy changes
because of the implementation of the HEDAP.
10. Consultation
10.1 The draft Housing Emergency Declaration Action Plan (HEDAP) was consulted
with a range of key stakeholders including the West Dunbartonshire Tenants
and Residents Organisation. The implementation of the HEDAP is predicated
on a consultative and collaborative focus and several key stakeholders are
represented on the Housing Emergency Project Board.
11. Strategic Assessment
11.1 Having considered the Council's strategic priorities, this report contributes
significantly to all strategic priorities.
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive & Adaptable
Peter Barry
Chief Officer, Housing and Employability
Date: 13th February 2025
___________________________________________________________________
Person/s to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Claire McKay – Housing Development Co-ordinator,
Housing Development and Homelessness Team, Housing
and Employability, email: Claire.Mckay@west-
dunbarton.gov.uk                                                                                              
Appendices: 1. Housing Emergency Action Plan, February (available 3rd
February 2025)
Page 49

Page 50

Background Papers:   Housing Emergency Declaration, Housing and Communities
Committee, May 2024
Report to Housing and Communities Committee; Housing
Emergency Action Plan
Homelessness Statistics Bulletin, Scottish Government,
September 2024
Housing Emergency Action, Equalities Impact Assessment
Screening, June 2024
Wards Affected:             All    
Page 50

Page 51

Housing Emergency Declaration action plan
Generated on: 03 February 2025
Icon Name
1 - Deliver and maintain More Homes - West Dunbartonshire approach to the delivery of affordable housing.
Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Issue letter to the Housing
Minister highlight the Housing
Emergency declaration and
requesting that the full AHSP is
restored.
30-Aug-
2024
Yes letter issued to minister
- covering Acquisition
funding and the new
temp accommodation
funding and concerns
over the formula used
to distribute
Highlight within SHIP and
Programming Process the
impacts of cuts to the AHSP
31-Oct-
2024
Yes Draft SHIP submitted to
Scottish Government
Participate in a number of
Member and Officer groups and
influence agenda to maximise
AHSP budget settlement
31-Mar-
2025
Yes
Continue to lobby SG
for increase in AHSP
funding in
partnership with
COSLA/SOLACE/ALA
CHO
31-Mar-
2025
West Dunbartonshire
Council was allocated
an additional £800k to
spend in 2024/25
through the Affordable
Housing Supply
Programme in
recognition of our
ability to deliver, the
additional funding is
from the existing
funding within the
AHSP.  Discussions took
place on 29/1 with a
view to diverting more
money into West
Dunbartonshire before
the end of the year.  In
terms of 2025/26 we
await the budget
announcements, but we
expect an increase in
our RPA for 25/26
Review impact of discussions
with Scottish Government
31-Mar-
2025
No
John Kerr
Presentation to West
Dunbartonshire Strategic
Housing Providers Forum
30-Aug-
2024
Yes Complete and call for
sites requested
Carry out prioritisation exercise 21-Oct-
2024
Yes Completed milestone
and included within
SHIP
Item 9 -
Appendix 1
Page 51

Page 52

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Refresh Strategic
Housing Investment
Plan to ensure the
delivery of new
homes to meet acute
housing need in
West Dunbartonshire
29-Nov-
2024
Draft SHIP approved by More
Homes Project Board
31-Oct-
2024
Yes Draft SHIP approved by
More Homes Board
(October), submitted to
Scottish Government
pending formal Housing
and Communities
Committee Approval
John Kerr
Deliver new
Strategic Housing
Investment Plan
31-Oct-
2024
SHIP approved at
Housing and
Communities
Committee of 20th
November    
Jamie Dockery
Deliver the Council's
approved new build
programme for
24/25 helping meet
the identified
housing need.
01-Mar-
2025
Willox Park now on site
as of 25th November    
Dawn Conner
SHIP to be prepared and draft
submitted to the Scottish
Government by October 31
31-Oct-
2024
Yes Milestone achieved,
SHIP expected to
receive formal approval
from Housing and
Communities
Committee in November
Develop and acquire More
Homes Project Board approval
for proposal to ensure the
acceleration and prioritisation
of new home delivery.
31-Dec-
2024
Yes More Homes Project
Board approved the
acceleration of the
Queen Mary Avenue
development (October
2024).  Assessments
being made in terms of
other approved and
committed projects.
Examine ways to
accelerate new build
delivery considering
housing emergency
declaration
31-Dec-
2024
While the initial action
is complete, ongoing
progress in this will be
reported and monitored
within the governance
of the More Homes
Board.  There does
continue to be internal
challenges in the
delivery of new
housing.
Develop revised Strategic Local
Programme in partnership with
Scottish Government
Yes Programme in place and
shadow programme
identified and will be
confirmed within
forthcoming SHIP
John Kerr
Page 52

Page 53

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
17 buy backs completed so far,
this financial year
(11 Larger properties 3 bed +
& 6 non-larger 1 & 2 beds)
We have a further 8 under
offer awaiting completion
(2 Larger properties 3 bed + &
6 non-larger 1 & 2 beds)
Yes
Scale up and extend
the Buy Back
Scheme to meet the
key housing demand
factors including the
provision of
temporary
accommodation
31-Oct-
2024
The buyback scheme
has been scaled up
through £10m of
additional funding over
the next 5 years in
addition for 2024/25 we
have been awarded an
additional £309k to
secure buyback
acquisitions that
directly take households
out of temporary
accommodation, our
stated priority is
families with children.
We have completed 13 buy
backs so far in this financial
year, with another 9 properties
under offer, awaiting
completion. 7 of these
properties have been let so far,
with 4 of the lets going to
homeless applicants.
Yes
Laura Hanna
Participate in Housing
Investment task force
discussions
25-Sep-
2024
Yes Announcement of
£100m funding to
support delivery of MMR
which will allow £500m
investment across
Scotland.  Proposals
being developed in
West Dunbartonshire
which will allow any
opportunities to be
realised
Continue to develop own
proposals in partnership with
external agencies and potential
investors
16-Feb-
2025
No Discussions ongoing in
partnership with
Scottish Futures Trust,
we await further
clarification from the
Scottish Government in
terms of the announced
MMR fund within the
Programme for
Government.
Page 53

Page 54

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Explore innovative
housing investment
and partnership
models to maximise
housing investment
approaches
31-Mar-
2025
Proposal paper to More Homes
Project Board in December to
define policy
28-Feb-
2025
No This action has slipped
from January, and we
await announcements
from the Scottish
Government re budget
commitments and the
allocation of funding
.
John Kerr
In partnership with
the Scottish
Government review
the planning and
consenting system
considering the
national housing
emergency to
increase the scale
and pace of
development across
all tenures
28-Feb-
2025
Action being progressed
through national
dialogue
Peter Barry;
Alan Douglas;
Michael
Mulgrew
Detail development priorities
within SHIP
31-Oct-
2024
Yes Prioritisation exercise
carried out as part of
SHIP process
Review HRA resource
allocation across the
Council to help
facilitate/deliver new
build programme
28-Mar-
2025
Action now delayed
until March 2025 as the
new service design for
Housing Development
was not supported by
the SRRG
Housing Develop service design
to be completed
28-Mar-
2025
No Service Redesign
approved by SRRG now
working to implement
John Kerr
Approval for Gilmour Avenue
modular development
25-Sep-
2024
Yes Scottish Government
approval September
2024 and homes now in
development
Develop revised approach
based on review and share with
development partners
31-Dec-
2024
Yes
Explore an approach
to develop modular
and other forms of
innovative housing
by working in
partnership with
other housing
providers
28-Feb-
2025
For noting - Scotland's
leading modular home
deliverer has gone into
administration
Review Gilmour development 28-Feb-
2025
No
John Kerr
Examine the
capacity of the HRA
to deliver agreed
housing ambitions
31-Mar-
2025
Action being progressed
and will meet target Peter Barry
Page 54

Page 55

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Participation in Scottish
Government trawl process
30-Sep-
2024
Yes Participation confirmed
Special More Homes Board
scheduled for November to
look at the opportunities with
other service departments
(now Housing Summitt).
28-Feb-
2025
No This will be explored
through the WD
Housing Summit taking
place on 10/2
Engage with public
and private sector
landowners to
increase the HRA
landbank and
support development
in line with the
refreshed Strategic
Housing Investment
Plan
31-Mar-
2025
Discussions ongoing
with one housing
developer re potential
for them to landbank
housing opportunities,
model to be explored
further.
Plan agreed at More Homes
Board to inform delivery plans
from 2025/26
31-Mar-
2025
No
John Kerr
Review Affordable
Housing Design
Standard
31-Mar-
2025
Full review to be
undertaken in early
2025, but the design
standard was examined
as part of the SHIP
development process
and it was found not to
be limiting in terms of
new build ambitions,
many developing
associations citing it as
a benefit in the design
process and providing
clear guidance.
John Kerr
Increase provision of
Mid-Market Rent
properties as a
viable housing option
for homeless and
housing applicants
30-Apr-
2026
Proposal is being taken
forward following May
committee approval;
however, we now await
clarity following the
Programme for
Government
announcements
John Kerr
Icon Name
2 - Make Best Use of Existing Stock
Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Continue to Improve
our approach to
31-Dec-
2024
Although the action has
been completed work     Martin Feeney
Page 55

Page 56

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
empty council homes
with a strengthened
focus on reducing
void time and letting
longer term empty
homes and negating
any use of
unsuitable
accommodation.
continues on the Void
Improvement Action
Plan working alongside
Housing Operations to
improve performance
across the Council.
Building Services
continue to set targets
to improve productivity
and reduce the average
cost to bring a property
back to the Councils'
relet standard.
At end of quarter 3 to
end of December
Building Services had
received 665 and
returned 706 ready for
let properties. The
average time to bring
back to relet standard
in quarter 3 was 13
days (target 12 days)
compared with 27 days
in 2023/2024
(discounted days).
Actual days in quarter 3
was 55 days compared
to 79 days in quarter 2.
Up to the 27/01/2025
major and extensive
voids have been
reduced by 15. The
average cost to bring a
property back to the
Councils' relet standard
has reduced in
2024/2025 compared to
2023/2024. Less void
properties have been
subcontracted and a
significant reduction in
void overtime costs has
Page 56

Page 57

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
been achieved. Costs
may increase in quarter
4 as efforts to achieve
the target of 150 by
year end continue.      
Implement and monitor
measures to improve the
control and generation of non-
essential repairs.
30-Aug-
2024
Yes Milestone complete with
on-going monitoring in
place. Whilst training
and briefings have
reduced the throughput
of unjustified repairs;
monitoring is carried
out and reviewed at
weekly team meetings.
Based on performance and
progress made on reducing the
number of empty homes agree
to continue to monitor and
postpone any decision on a
fixed term moratorium.
27-Sep-
2024
Yes Milestone complete.
Progress made on
reducing the number of
empty homes to end of
September without over
reliance on the use of
sub-contractors and
overtime informed the
decision to postpone
any decision on a fixed
term moratorium to not
carryout non-essential
repairs. A further
review will be
completed before the
end of quarter 3 to
consider if this action
should be implemented.
Page 57

Page 58

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Continue to implement
improvement actions in the
void management
improvement plan including
increasing productivity and
reducing the average cost to
bring an empty home back to
the Councils' relet standard.
29-Nov-
2024
Yes Sub action complete.
Actions in the void
management
improvement plan and
building services action
plan 2024/2025 action
are progressing well.
Increased productivity
in void operations and
reduction in the
average cost to bring a
void back to the
Councils' relet standard
are evident and further
improvement are
progressing and being
monitored. 
Consider a fixed
term moratorium on
non-essential
housing repairs to
focus activity around
bring empty homes
back into use
20-Dec-
2024
Action on track for
completion by target
date with 3 of the 4 sub
actions completed.
Actions in the void
management
improvement plan and
building services action
plan 2024/2025 are
progressing well.
Increased productivity
in void operations and
reduction in the
average cost to bring a
void back to the
Councils' relet standard
are evident and further
improvement are
progressing and being
monitored. The
reduction in costs is in
addition to reduced
costs for decorations
which is no longer
routinely completed.
Due to increased void
properties year to date
compared to 2023/2024
the use of sub-
contractors will increase
December - March.
Review evidence to make final
decision on a 3-month (last
quarter of 2024/2025)
moratorium on non-essential
housing repairs to focus
resources on the repair of the
Councils' housing properties.
13-Dec-
2024
Yes Decision taken to not
introduce a moratorium
at this time.
Martin Feeney
Complete review of
referral/communication
processes between void team
and Helptomove
30-Sep-
2024
Yes Review of existing
referral process
completed
Page 58

Page 59

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Engage with Consumer
Scotland to discuss problems
encountered and provide case
studies to support national
focus on holding energy
companies accountable to
resolve meter issues more
efficiently
30-Sep-
2024
Yes Completed, session held
with Consumer Scotland
with Housing
Operations and Building
Services Reps.  Case
studies of longer-term
meter void problems
shared to support
national discussions on
the matter to find
resolve
Introduce new report from help
the move to identify move ins
with no end date meter
readings to enable more
accurate billing information
30-Sep-
2024
Yes Completed -
helpthemove now send
weekly reports for
‘move ins’ with no end
meter reads. 
Introduce weekly monitoring
report for support worker to
track progress of complex
meter issues and update to
teams
30-Sep-
2024
Yes Completed and in place.
Weekly spreadsheet
introduced which
tracks/updates on
progress.  Shared as
part of weekly liaison
void meetings
Review liaison arrangements
with Helpthemove ensuring
appropriate representation to
input to operational challenges
30-Sep-
2024
Yes Action complete -
representation reviewed
and new void reps
added to liaison
meetings, this now
includes HB, WDC
Support Worker and
void maintenance
officers
Meetings focus on
operational challenges
and complex meter
problems to ensure
what help the move are
advising/assisting us
with the support worker
& HTM are doing as
quickly as possible.
Page 59

Page 60

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Develop escalation process
with helpthemove on more
problematic meter problems
31-Oct-
2024
Yes Helpthemove have
identified senior officer
in Scottish Power to
assist, OVO/SSE
covered under
Helpthemove contract. 
Key contacts in Help the
Move identified to
support escalation of
complex meter related
problems established
Develop a process
including exploring
potential partnering
arrangements to
address lengthy
delays by energy
suppliers in the
reletting process.
31-Dec-
2025
Explore other providers to
establish if can provide
additional support to
helpthemove arrangements
Yes Enquiries completed
with GEC, who
confirmed would
arrange for meter
installs on projects
subject to cost.  No
additional service to
helpthemove provided
Nicola
Pettigrew
Seek HACC approval of new
strategy - aim to bring 25
properties per year back into
use
30-Nov-
2024
Yes Consultation ended
30/9/24
Draft strategy being
updated for HACC in
November 2024
approval granted 20/11
Accelerate the
reduction of private
sector empty homes
by delivering a new
Long Term Empty
Homes Strategy
31-Mar-
2025
A significant milestone
was achieved which
seen the approval of
the new Empty Homes
Strategy by committee
on the 20th November
Review numbers of empty
homes brough back into use at
end of current financial year
31-Mar-
2025
No
Karen Rae
Carry put early consultation
with tenants to inform revised
Repairs Policy and ensure
tenant priorities are delivered.
30-Jun-
2024
Yes Complete - early
consultation complete,
over 1000 responses
received and tenant
feedback will help
inform development of
revised policy. 
Page 60

Page 61

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
HRA Value for Money Group to
develop revised Repairs Policy
which will meets tenant
priorities and reflects input
from key stakeholders.
31-Aug-
2024
Yes Complete - draft
Repairs Policy agreed
and following further
period of consultation
approval for policy to be
sought from Housing
and Communities
Committee in November
2024. 
Deliver with tenant
representatives a
new repairs policy
30-Nov-
2024
Seek approval for revised
Repairs Policy from Housing
and Communities Committee
November 2024.
20-Nov-
2024
Yes On track - report
prepared and will be
considered by
Committee 20 Nov
2024.
approval given.
Stefan
Kristmanns
Ensure new repairs
policy achieves key
objectives
30-Nov-
2024
New repairs policy was
approved by the HACC
Committee in
November 2024. The
policy will achieve
objectives to improve
the reactive repair
service, making this
more efficient whilst
meeting tenants’
expectations. Work is
progressing to get the
new policy live by 1
April 2025.        
Martin Feeney
Review and agree the new 70%
allocation to transfer applicants
for all new builds
30-Aug-
2024
Yes new protocol written
and agreed between
Housing operations and
Homeless services.
ongoing allocations
discussion to complete
new media/drive for
downsizing etc
16-Feb-
2025
No have a new report to
better understand who
we want to target - but
need to have awareness
current targets
Page 61

Page 62

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Review and promote
Allocations Policy
flexibilities and
enhanced Transfer
Incentive Scheme
linked to the review
of the Housing
Allocations approach
31-Mar-
2025
Review current transfer
incentive scheme
28-Feb-
2025
No linked to mutual
exchange and other
pieces of work
follow up meeting
20/12, additional
meeting 17/01
Claire McKay
Introduce notification to Repair
and Maintenance Manager on
voids properties due for return
on back of transfer move in
advance of sign-up
30-Sep-
2024
Yes Completed - introduced
as part of Clydebank
East new build
development.  This
model will be used for
all future new build
sites
Introduce robust pre-allocation
house assessments process
which embeds ongoing
discussions with Building
Services to highlight condition
of voids and recharges as
required
30-Sep-
2024
Yes Complete - Process
revised as part of
Clydebank East
development, this
model/approach will be
used for all future new
build sites
Introduced homeless liaison
meetings in advance handover
dates to identify existing WDC
tenants with open homeless
case
30-Sep-
2024
Yes Completed and in place
- implemented for
Clydebank East
development, phase 1
underway with other
phases to follow.  This
model/approach will be
used for all future sites.
Prepare lettings initiative action
plan
30-Sep-
2024
Yes Complete - action plan
shared and consulted
internally for Clydebank
East.  Same model will
be used for future sites
Identify properties for each
quota and engage with relevant
teams to finalise
31-Oct-
2024
Yes Completed - Clydebank
East new build,
model/approach will be
same for future sites
Page 62

Page 63

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Actively introduce a
pre letting process
initially linked to the
transfer led
allocation process for
new build social
housing
11-May-
2025
Review house assessment form
to ensure capturing relevant
information via HO mobile app
30-Apr-
2025
No Mobile app working
group established,
initial area of NTV in
place with other service
areas to follow.  PTV
developed and being
tested before further
rollout, house
assessment will be next
function to be
reviewed/developed.  
Target timeline requires
to be extended to
reflect status of
development stage to
30/4/25
Nicola
Pettigrew
Project board to agree options
for HACC following all feasibility
studies and financial reviews
Linked to action H/RRTP/19-
24/064
16-Feb-
2025
No new staff member in
place now so a focus on
this project going
forward
HACC approval on options 30-Nov-
2025
No
Deliver the
recommendations
from the Supported
Housing Review
31-Mar-
2026
Action on track and
deliverables
programmed from
November 2024
Carry out procurement exercise
to meet new needs and options
agreed
30-Jan-
2026
No
Claire McKay
Establish project plan and
resource requirement
30-Nov-
2024
Yes Resource allocation
agreed in November
Better Homes Board,
Senior Housing
Development Officer will
project manage
assessment, but it
requires full buy in from
all service areas.
Initial Report findings to be
presented and
recommendations agreed at
Better Homes Project Board
17-Feb-
2025
No
Page 63

Page 64

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Stock assessment to be
undertaken against key
technical and operational
indicators to assess
performance
23-Feb-
2025
No
Finding to inform refreshed
Housing Asset Management
Strategy which will be
presented to February
committee
28-Feb-
2025
No
Carry out a
comprehensive
assessment of our
housing stock to
ensure it can deliver
the key priorities
within the Local
Housing Strategy
28-Feb-
2025
Implementation Plan including
the focused regeneration
initiatives to be led by Housing
Development Co-ordinator
(Better Homes)
28-Feb-
2025
No
Jackie McRory
1000 Homes 31-Oct-
2024
Yes 1000 now completeContinue to roll out
our approach to
address
condensation,
dampness and
mould within our
homes through the
use of smart
technology that
strengthens housing
management
31-Mar-
2025
Environmental sensors
now installed at over
1100 homes 2000 homes 31-Mar-
2025
No
Emily Dorrian
Initial Proposal developed 18-Oct-
2024
Yes
The initial introduction of 2 new
compliance roles to be
managed within the housing
service and dedicated to HRA
properties (phase 1)
28-Feb-
2025
No Two statutory
compliance roles are
anticipated to be
approved at the SRRG
on 3/12
Implementation of Phase 1 31-Mar-
2025
No
Page 64

Page 65

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Deliver new
proactive approach
to ensure our
housing stock
continues to meet all
statutory compliance
requirements
31-Mar-
2025
Proposal developed and
shared within senior
housing team/Better
Homes Board
Review of planned approach
with tenant representatives
and paper to be submitted to
More Homes Board in Mach
regarding a potential Phase 2
to ensure compliance
requirements are met
31-Mar-
2025
No
John Kerr
Obtain baseline data to support
VFM in promoting mutual
exchange options with
applicants
30-Sep-
2024
Yes Completed
Review functionality and best
practice with Home Swapper
30-Sep-
2024
Yes Completed
Introduce quarterly marketing
information via social media,
tenants’ news to maximise
awareness
28-Feb-
2025
No Downsizing information
included in Tenants
News, flagged to TP
team to include in
future editions.
Similar info being
finalised for social
media release to raise
awareness
Add opt our option to housing
application form
31-Mar-
2025
No Online application form
in progress to be
implemented, include
option as part of revised
form
development work in
progress and testing
underway, will require
soft launch once testing
complete
Complete marketing awareness
campaign to increase use of
home swapper
31-Mar-
2025
Yes Completed - text/social
media information,
increase in sign up by
39%. 
Page 65

Page 66

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Prepare paper to outline
required additional resource
needing to support increased
capacity of home swapper
31-Mar-
2025
No To be progressed via
home swapper working
group
Maximise use of
Home Swapper to
meet rehousing need
of transfer applicants
31-Mar-
2025
Review VFM annual costing of
home swapper and consider if
in-house platform could be
developed (similar to rent
insights approach)
31-Mar-
2025
No NP has initially
discussed with BF, to be
discussed further at
next Home swapper
working group to scope
out feasibility
Nicola
Pettigrew
Gather all information on all
leases for an overview
30-Nov-
2024
Yes Action on track, some
information outstanding
but plan to convene a
meeting in early
December to satisfy all
information is in place
before undertaking a
sprint review to allow a
discussion at the
January Housing
Improvement Board
Review of all current
lease agreements
within context of
housing emergency
(e.g., Safe as
Houses scatter flats
and impact on
generating
homelessness)
31-Mar-
2025
Review all leases and decide
whether best use of housing
stock
31-Mar-
2025
No
John Kerr
Deliver housing
Capital Investment
Programme to
ensure all homes
meet the Scottish
Housing Quality
Standard
31-Mar-
2025
Work is progressing
well with 24-25 Capital
investment Programme
work streams that
contribute to SHQS. Mid
-year SHQS position is
meeting target.
Alan Young
Maximise the use of
existing housing
systems to support
effective stock
management
31-Mar-
2025
action being taken
forward as part of IHMS
Improvement Plan,
IHMS team working
with a nominated
Senior Housing
Development Officer to
ensure the system
meets wider housing
service needs before    
Graham
Watters
Page 66

Page 67

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
involving key managers
Icon Name
3: Enhancing housing access & prevention of homelessness
Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Develop and
implement transfer
led approach to new
build housing
allocations
31-Aug-
2024
Action has been
achieved but will be
monitored and a report
will follow initially to the
More Homes Project
Board recommending
any refinements
following a review of
Clydebank East
detailing we are making
allocations based on
housing need and there
is visibility that it is
tackling homelessness.
Committee Approval in place
and ensure ongoing tenant
support
30-Aug-
2024
Yes Completed
John Kerr
Set up meeting with all seniors
management from both HSCP
and Housing/Homeless to take
forward discussions
29-Nov-
2024
Yes meeting confirmed for
7th Feb Strengthen strategic
leadership approach
with HSCP regarding
housing emergency
14-Feb-
2025
Follow up actions from joint
meeting
14-Feb-
2025
No
Peter Barry;
Margaret-Jane
Cardno
set up new meeting of the
housing bill group now Bill is
through stage 1
30-Oct-
2024
Yes set up 13/11
Discuss options for task force -
link to timeline for the bill
29-Nov-
2024
Yes
Establish a Task
Force approach to
engage public bodies
to promote
prevention measures
linked to the Housing
(Scotland) Bill
31-Mar-
2025
Task force established
and expectation is
Stage 2 of the BILL will
make its way through
Parliament in early
2025.
Develop West Dunbartonshire
approach
31-Mar-
2025
No The approach will be
inclusive of a housing
emergency
implementation plan
John Kerr
Page 67

Page 68

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Finalise draft of strategy
following consultation (Aug
until Dec)
31-Dec-
2024
Yes draft to be published on
the website by 16/12 -
consultation open until
20/12
Seek HACC approval of new
strategy
28-Feb-
2025
No
Develop a new
refreshed strategic
approach to the
prevention of
homelessness
through the delivery
of a Housing
Solutions Strategy
01-Apr-
2025
Embed and deliver new
strategy
01-Apr-
2025
No
Claire McKay
VAWG partnership supportive
of action H/HEDAP/2024/038
but will be carrying out a self-
assessment of the group where
Prevention will be a key
element
30-Nov-
2024
Yes In partnership with
Violence Against
Women Partnership
deliver a refreshed
focus on preventing
negative housing
situations as a result
of domestic abuse.
31-Dec-
2024
deliver action
H/HEDAP/2024/038
31-Dec-
2024
Yes to be signed off agreed
by HIB on 27/01
Claire McKay
Job evaluation 21-Feb-
2025
No Still awaiting outcome
of JE: Job reads
received for 4 posts,
grading for these posts
still outstanding.  still
awaiting job reads and
grading for 3 additional
posts. 
Direct Matches & Matching
Pools and Expressions of
Interest
31-Mar-
2025
No Await outcome of JE
before this can be
completed
Full implement the
introduction of the
Housing Solutions
Service following on
from the
Homelessness
Service redesign
30-Apr-
2025
Service Rebranding Action List No To be completed on
restructure
Joanne
Sutherland
Agree in principle online form
and tweak to ensure all aspects
covered
30-Sep-
2024
Yes meeting 26/09 - all
partners agreed to form
following last
amendments and will
look for formal
agreement from
management
committees
Page 68

Page 69

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
RSL to seek Committee
approval on form before being
finalised
30-Nov-
2024
Yes agreement given at
meeting 05/12 but
further discussions on
legal contract and data
protection
Agree data sharing agreement
and Information to be used on
the website for all involved and
link
28-Feb-
2025
No at the meeting on 5/12
a legal agreement along
with a data sharing -
unable to meet WDC
legal until the new year
- until this is agreed no
launch date can be
agreed.
In partnership with
local RSLs develop
and implement a
common application
form for all social
housing providers in
West Dunbartonshire
as part of the
development of a
Common Housing
Register
30-Apr-
2025
Agree Launch online form 31-Mar-
2025
No
Claire McKay
this is linked to Action 48 being
achieved first
31-Oct-
2024
Yes
Delivery of stock sheet training
and Team Leader
Support/shadowing in
interviews.
28-Feb-
2025
No Delayed due to staff
absences but planned in
early February.
Development and trial of
Housing Solutions paperwork
and personal housing plan.
28-Feb-
2025
No Paperwork finalised and
partially rolled out for
use across all staff. 
Slight problem with the
recording on AVD still to
be resolved.
Completion to module 6
housing options toolkit for all
casework staff
31-Mar-
2025
No
Review process once new
structure in place
30-Apr-
2025
No This includes task
groups to identify
training gaps/
workshops on DV,
young people etc.
Introduce a
comprehensive
housing options
interviews at
application stage to
manage demand and
options
30-Apr-
2025
Housing Options Survey and
presentation to all casework
staff
Yes
Joanne
Sutherland
Page 69

Page 70

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Decision paper for Housing
Improvement Board to agree
the extent of the review
31-Aug-
2024
Yes paper presented and
agreed on 26/08
meeting of Co-ordinators to
agree the remit
30-Sep-
2024
Yes Co-ordinators meet on
02/09 - agreed remit
draft updated remit and
process to be agreed on
24/09
new paper to HIB agreeing new
proposals of the remit
31-Dec-
2024
Yes agreed to rollout from
1st feb
paper going to HIB to
27/01 HIB to update,
quarterly monitoring
update guidance and relevant
policies on agreed remit
31-Dec-
2024
Yes Allocation panel remit
updated and agreed by
co-ordinators, to be
circulated along with
updated guidance to all
staff before the rollout
on 1st feb
Review remit of
Housing Allocations
Panel to reflect a
homelessness
prevention
perspective
(domestic, at risk,
others that would
otherwise present)
31-Jan-
2025
communicate and update new
remit to all staff
31-Jan-
2025
Yes finalised guidance
circulated to all staff for
the rollout from 1st feb
Claire McKay
Review current open Homeless
cases with children
06-Dec-
2024
Yes to identify those in
temporary
accommodation, those
on offer and still
waiting.
identify actions for
those who are no on
offer
92 on the list -
reviewing list and will
finish on 16/12
Page 70

Page 71

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Joint meeting between
Homelessness and Housing
operations focusing cases who
do not have an offer
20-Dec-
2024
Yes initial meeting held on
02/12 - reviewing data,
agreed for a follow up
meeting on 16/12 to
agree any actions
reviewed all cases and
taken various actions;
• extra discussions with
households to try
expanding areas
• look to match those
RFL - issues is majority
3 apt and are largest
blocker is 5apt plus
• prioritise households
who have children in
temp with them and not
access
• add access, bed sizes
to the allocations policy
review
• flag sizes/areas to the
buyback officer
following on identify any new
processes to be implemented
and rolled out to help
continually reduce times
children spend in temporary
accommodation
31-Jan-
2025
Yes flag sizes and areas in
most demand to RSL
added access and
bedroom sizes to the
policy review
agree priority to non-
access households
Deliver a refreshed
process which will
ensure that time in
minimised for
children in all forms
of temporary
accommodation
31-Mar-
2025
Using additional Temporary
accommodation funds to focus
on acquisitions for those
households in temp with
children waiting on offers
28-Feb-
2025
No
Claire McKay
Page 71

Page 72

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Carry out recent research
around stigma and homeless
with view to creating further
actions to take forward
20-Dec-
2024
Yes Consulted wider work
around the stigma of
homelessness and how
to reduce. Including
'Responsibly
Communicating
Homelessness' -
published as a result of
the HARSAG
recommendation
around reducing the
stigma of households
experiencing
homelessness, which is
designed to ensure that
appropriate language is
used by professionals
when supporting such
groups, the use of
images within
publications don’t
reflect typical
stereotypes and overall
shifting the view of
homelessness to a
modern and evidence-
based direction.
As well as Crisis
research around public
attitudes to
homelessness and the
importance of sharing
examples of lived
experience to give a
wider understanding of
the issue, allowing for
the systematic causes
and consequences of
homelessness to be
emphasised to allow for
systematic solutions.
Further actions to be
created based on above
research.
Design and deliver a
dynamic public
awareness campaign
focused on the
realities of
homelessness and
housing need
31-Mar-
2025
Donna
Kirkwood
Page 72

Page 73

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Liaise with WDC comms team
on appropriate campaign
actions
31-Jan-
2025
Yes Meeting took place end
of January to discuss
best way to progress in
terms of additional
milestones and timeline
to be complete. 
Review WDC homeless
webpage content to ensure
appropriate language/images
used around homelessness.
03-Feb-
2025
Yes Webpages are updated
regularly, ensuring
homelessness advice is
up to date and
communicated
effectively and
appropriately.
Identify positive case studies
detailing household
circumstances and support
provided by WDC to resolve
homelessness to highlight help
available and realities of
homelessness.
12-Feb-
2025
No
Review of Pathway 1
cases (i.e., those
homeless but not in
temporary
accommodation)
over 6 months to
assess if in stable
accommodation (and
close if this is
confirmed)
31-Mar-
2025
Ongoing review. No A moving feast; as
cases are closed or
pathways are escalated
when temporary
accommodation is
required, demand for 1
bed or larger family
households.  Significant
number are DV cases
which may be resolved
under
prevention/allocations
panel going forward.
Joanne
Sutherland
Linked to action 48 being
achieved first
31-Oct-
2024
Yes
Page 73

Page 74

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Introduce a
consistent
assessment of
housing and support
needs regardless of
if a tenant or
presenting as
homeless
31-Mar-
2025
review support process once
new housing solutions services
are rolled out
31-Mar-
2025
No
Claire McKay;
Joanne
Sutherland
Develop and
implement a new
approach to
resettlement and
humanitarian
schemes
31-Mar-
2025 Claire McKay
Minimise and
eradicate the use of
unsuitable
accommodation for
homeless households
31-Mar-
2025
Joanne
Sutherland
Objective 1 - whole system
approach
01-Apr-
2025
No
Objective 2 - rapid rehousing
(16 weeks)
01-Apr-
2025
No
Objective 3 - interim housing
options
01-Apr-
2025
No
Deliver the outcomes
of the Rapid
Rehousing Transition
Plan
30-Apr-
2025
Objective 4 - housing first 01-Apr-
2025
No
Claire McKay
Linked to Action 48 being
achieved first
31-Oct-
2024
Yes Explore expanding a
homelessness
prevention approach
and better managed
demand for
temporary
accommodation
30-Apr-
2025
review in line with decrease of
pathway 1 and increased need
to for temp
07-Feb-
2025
No Joanne
Sutherland
Action 48 needs achieved first 31-Oct-
2024
Yes
Page 74

Page 75

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Introduce a
"Mediation First"
approach to housing
applications for
16–19-year-olds (as
a homelessness
prevention
approach)
30-Apr-
2025
Restructure - once in place and
introduction of youth specialist
team put process in place
31-Mar-
2025
No
Joanne
Sutherland
actions 37, 42, 46 and 47 can
then follow on from this action
if achieved
31-Oct-
2024
Yes
Paper on the possible vision to
be taken to Access to Housing
Group in December (Now Feb
2025)
17-Feb-
2025
No
Agree principles relating to new
on door housing access system
aligned to the new Housing
Solutions service
28-Feb-
2025
No
Implement a ‘One
Door’ preventative
housing access
system under one
service to prepare
for new prevention
duties.
31-Mar-
2025
Proposal being
developed and will be
introduced for
discussion at the next
Board
Develop implementation plan 28-Mar-
2025
No
John Kerr
Upscale the Housing
First programme
through collaborative
commissioning
31-Mar-
2025
review current provision 28-Feb-
2025
No
Claire McKay
Deliver and
implement in
partnership with RSL
a Common Housing
Register for West
Dunbartonshire
31-Mar-
2025 Claire McKay
Icon Name
4: Strengthen the Financial viability and capacity of the Housing Revenue Account and associated Housing and Homelessness budgets
Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Building services action plan
created
31-Oct-
2024
Yes internal pan created
Page 75

Page 76

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
Complete the review
of Building Services
Repairs and
Maintenance service
costs to deliver
immediate
efficiencies to the
HRA
31-Mar-
2025
Building Services -
Service Costs Recovery
and Management of the
HRA Maintenance and
Repairs Budgets
2024/2025 is
progressing well with all
high priority actions
90% or more complete
at 23/01/2025. These
action include
improving service
efficiency, effective
financial management
and improve people
management practice
within the service. 
Deliver action plan - include
service efficiencies
31-Mar-
2025
No
Martin Feeney
Explore innovative
housing investment
and partnership
models to maximise
housing investment
approaches
28-Feb-
2025
Working Group
established, revised
housing investment
approaches are also
included in the work of
the Housing Investment
Task Force led by the
Scottish Government
John Kerr
Carry out review of
HRA contributions to
other non-housing
Council service areas
30-Jun-
2025 Peter Barry
Examine the
capacity of the HRA
and the Council's
General Fund to
deliver agreed
housing ambitions
14-Mar-
2025
Peter Barry;
Laurence Slavin
Develop a 3-year
rental strategy in
partnership with
tenants to ensure
tenant priorities and
28-Feb-
2025
Stefan
Kristmanns
Page 76

Page 77

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
strategic housing
ambitions can be
delivered
Review Building
Services structures
and external
contractors to
ensure best value
31-Mar-
2025 Peter Barry
Working with other
local authority
partner re-examine
housing finance
position in Scotland
to promote the
delivery of new
social housing
including the
treatment of historic
HRA Capital Debt
31-Mar-
2025 Claire McKay
Review
homelessness
services funding with
aim of being able to
reduce level of
temporary
accommodation and
free up staff
resource
31-Mar-
2025
Peter Barry;
Laurence Slavin
Develop a refreshed
funding delivery
model for the
delivery of new
housing in light of
increased borrowing
levels exploring
increased grant
benchmark levels
31-Mar-
2025
Work ongoing in terms
of this action to ensure
we can continue to
deliver the required
new housing at
sustainable scale
John Kerr
Directly lobby the
Scottish Government
to ensure the cost of
achieving net zero in
31-Mar-
2025 Claire McKay
Page 77

Page 78

Action Status Progress Due Date Comment Milestone Due Date Done Comment Assigned To
social housing is met
with national funding
to ensure rental
income can be
utilised for improving
current and
developing new
social housing.
Action Status
Cancelled
Overdue; Neglected
Unassigned; Check Progress
Not Started; In Progress; Assigned
Completed
PI Status
Alert
Warning
OK
Unknown
Data Only
Long Term Trends
Improving
No Change
Getting Worse
Short Term Trends
Improving
No Change
Getting Worse
Risk Status
Alert
High Risk
Page 78

Page 79

Warning
OK
Unknown
Page 79

Page 80

Page 80

Page 81

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Housing and Employability
Housing and Communities Committee - 26 February 2025
___________________________________________________________________
Subject:  “More than a Roof,” West Dunbartonshire Council Housing
Solutions Strategy, 2025 – 2028.
1. Purpose
1.1 The  purpose  of  this  report  is  to  seek member  approval  of  the  new  housing
solutions strategy “More than a Roof” 2025 – 2028. This new strategy will succeed
West Dunbartonshire’s Rapid Rehousing Transition Plan (RRTP) strategy “Home
at the Heart” as the key strategic response to homelessness and housing access in
West Dunbartonshire.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Note the contents of the report and approve the new West Dunbartonshire
Council Housing Solutions Strategy ‘More Than a Roof’ as attached as
Appendix 1 of this report.
(ii) Note the detailed consultative process carried out in developing the
strategy inclusive of direct engagement with individuals with liver
experience of homelessness and housing crisis summarised in Appendix
2 of this report.
(iii) Invite the Chief Officer, Housing and Employability to fully implement the
Housing Solutions Strategy within the referenced time,
(iv) Invite the Chief Officer, Housing and Employability to direct the Rapid
Rehousing Transition Plan funding award from the Scottish Government
to the delivery of the new strategy’s key objectives;
(v) Note that an annual update and progress report will be provided to the
Housing and Communities Committee at the first Housing Committee of
each calendar year;
3. Background
Our current strategy “Home at the Heart”, which was our RRTP has ended. This
ran from 2019 and was extended by a year due to Scottish Government funding
also being extended.
There has been no further ask from the Scottish Government to renew our RRTP.
Therefore, we have taken the decision to produce a new homeless strategy which
will be referred to as our Housing Solutions Strategy in line with Council’s new
3.1
3.2
Item 10
Page 81

Page 82

service delivery model.  It will be a three-year strategy; 2025 – 2028 so the timing
is aligned to West Dunbartonshire’s Local Housing Strategy.
3.3 Extensive  consultation  was  carried  out  with  service  users,  staff,  and  other
stakeholders to agree the key objectives to be deliver through the strategy.  A full
summary of the consultation results is in Appendix 2 of this report.
3.4 “More than a Roof” aims to build on the achievements of “Home at the Heart”,
our Rapid Rehousing Transition Plan.  It has been developed within the
backdrop of a Housing Emergency Declaration both locally and nationally,
where demand for social housing is higher than ever, and supply cannot meet
demand.   At the time of writing, 13 Local Authorities have declared housing
emergencies, alongside a national declaration by the Scottish Government on
15th May 2024.  West Dunbartonshire Council was the fifth local authority to
declare a housing emergency on 1st May 2024.
3.5 It worth noting that the Housing (Scotland) Bill 2024 will be enacted during the
time of this strategy.  Part 5 of the bill will have a significant impact in terms of
statutory duties around the prevention of homelessness and the development
of the strategy was cognisant of this and includes objectives and actions that
have taken account of the proposed legislative changes.
3.6 An  update  report  will  be  provided  to  the  first  Housing  and  Communities
Committee  every  year,  detailing  achievements  each  year  and  highlight  any
changes required.
4. Main Issues
4.1 Following  consultation  the  key  themes  and  asks  were  clear  and  have  beeni
ncorporated as the key objectives for “More than a roof”.  The full strategy is in
Appendix 1.  The four strategic objectives are;
1. Homelessness is prevented by providing good quality advice and
information to enable informed decisions on personal housing solutions,
2. Where homelessness does occur households are rehoused quickly,
3. Review and ensure there are a wide range of support services available
to prevent and end homelessness, and
4. Working with partners to provide Interim options for temporary
accommodation and providing best quality temporary accommodation
where required.
4.2 Homelessness is prevented by providing good quality advice and information to
enable informed decisions on personal housing solutions.
This objective builds on our successful performance to date and ensures the
service will be well placed for the pending legislative changes from the Housing
(Scotland) Bill 2024.  It incorporates what our consultation told us that there is
still more that can be done to help prevent homelessness including exploring
more alternative housing options.  From the consultation on the draft strategy
this was the joint top objective people wanted delivered.
Page 82

Page 83

The table below details the number of cases that approached West
Dunbartonshire Council (WDC) housing options services and their outcomes
for 2023/24;
Outcomes 2023/24 2023/24
Number %
LA tenancy 36 9%
Private rented - assured tenancy 18 5%
Hostel - local authority 0 0%
Moved-in with friends/ relatives 8 2%
Other (known) 5 1%
Not known 2 1%
RSL (Housing Association) tenancy 14 4%
Private rented - short, assured tenancy 4 1%
Residential care / nursing home 0 0%
Home Ownership - Low-Cost Home
Ownership 0 0%
Home Ownership - Bought own home via
other means 1 0%
Sheltered Accommodation 1 0%
Shared Property - LA 0 0%
Shared Property – RSL (Housing Association) 0 0%
Shared Property - Private Rented Sector 0 0%
Lodger 0 0%
Prison 0 0%
Hospital 0 0%
Lost contact with applicant 24 6%
Remained in current accommodation 179 46%
Made homelessness application to local
authority 94 24%
All 386 100%
Despite the successes of the service, we continue to have a considerable
demand for homeless services.  The table below shows the number of
households who presented as homeless to WDC in 2023/24;
Assessments 2023/24
value
Number of assessments 1104
Assessed as homeless 1010
Assessed as homeless, unintentional (duty to
house) 1000
Households assessed as homeless
- Rate per 10,000 households 235
Some of the key actions within this objective expected to be delivered during
the time of the strategy are;
Page 83

Page 84

 Introduce a Housing Solutions Charter for provision of information and
advice,
 Rolling out a common housing application form for social housing
providers in West Dunbartonshire,
 In line with the Housing Act liaising with relevant public bodies and
landlords to help them understand their responsibilities to ‘ask and act’
and explore actions to prevent homeless,
 Exploring the option of creating a “one door” approach for all housing
information and advice which is consistent and robust, and which
captures new demand created from the Housing Act, 
4.3 Where homelessness does occur households are rehoused quickly.
This objective was also a key objective in our RRTP which was to reduce the
time households experiencing homelessness spend in temporary
accommodation.  This continues to be key focus for the Scottish Government
and the Scottish Housing Regulator.  During this strategy, the aim will be to
reduce the average time spent in temporary accommodation to 13 weeks. 
The table below shows the achievement of “Home at the Heart” to reduce the
average times.
2019/20 2020/21 2021/22 2022/23 2023/24
Avg time 15 wks 19 wks 16.5 wks 17.5 wks 17.5 wks
The size of properties households require continue to impact progress around
times in relation to numbers requiring one-bedroom properties and larger
families’ homes with four bedrooms or more, and this is factored within the
Council’s Strategic Housing Investment Plan.
Some actions we have agreed which will help deliver this objective, include;
 Regularly improving our online stock information and further promote so
residents have a better understanding of what our stock is like and what
becomes available to make informed decisions,
 To increase our housing supply through our new build and acquisition
programmes focusing on medical needs and larger family homes to meet
need our own stock is unable to address, and
 Continue to lobby the Scottish Government for increase affordable housing
funding.
4.4 Review  and  ensure  there  are  a  wide  range  of  support  services  available  to
prevent and end homelessness. 
A key theme from our consultation and one of the asks from service users was
more support and not all in the current format that its currently offered.   Support
can have positive impacts on tenancy sustainment and therefore help reduce
homelessness as a result.
Page 84

Page 85

From the consultation on the draft strategy this was the joint top objective
people wanted delivered.
We currently provide housing support for those who require whilst homeless to
comply with our Housing Support duty as part of Housing (Scotland) Act 2010.
We also have residential supported housing and a housing first support service,
although the latter service is still temporary as future mainstream funding is
uncertain.
Of those households who presented as homeless in 2023/24, 21% was
assessed as having a support need.  The table below shows of those how
many support need categories they had;
2023/24
No support needs 651
1 support need identified 260
2 support needs identified 129
3+ support need identified 64
All 1104
Key actions agreed to achieve this objective include;
 Reviewing the casework support assessment ensuring that it captures all
support needs of households to prevent and end homelessness,
 Exploring options to fund and provide more informal and practical type
support for groups that would not fall into prescribed housing support,
 The creation of a youth specialist housing support team as part of the
Housing Solutions service redesign,
 Reviewing and creating protocols to ensure positive partnership working
between the housing solutions service and all HSCP partners,
4.5 Working with partners to provide Interim options for temporary accommodation
and providing best quality temporary accommodation where required.
The initial consultation stated that 90% of services users said that their needs
were met with the temporary accommodation they were provided with and 78%
were happy with the location.   This still allows for further improvement to
explore and provide different options of temporary accommodation and there
was a strong emphasise again on partnership working. 
Table below details current dispersed temporary accommodation;
Area/No. of
rooms
1 2 3 4 Grand
Total
ALEXANDRIA 12 40 16 68
CLYDEBANK 35 76 21 132
Page 85

Page 86

DUMBARTON 15 24 7 2 48
Grand Total 62 140 44 2 248
The table below details our residential supported accommodation (temporary);
Supported accommodation
project
Ashton
View
Blue
Triangle
Alexandria
Blue
Triangle
Bonhill
Blue
Triangle
Clydebank
Number of places 20 10 8 13
This objective will look to explore additional options of interim accommodation
and review all partnership working. 
Actions agreed which will help achieve the objective are;
 Creating a stock profile for dispersed temporary accommodation and
review against temporary accommodation standards,
 Explore support and accommodation options for young people 16-21yrs,
 Implementing the recommendations of the Supported Housing Review
including smaller and self-contained accommodation options.
The Scottish Government for the 6 years of Rapid Rehousing Transition Plan has 
provided all local authorities with additional financial support.  They have
confirmed that through the budget processes for 2025/26 a minimum £8 million
Rapid  Rehousing  Transition  Funding  will  be  available  to  all  Scottish  Local
authorities.  We are currently awaiting confirmation of WDC allocation of this
funding, but we would estimate it to be around £250k. The funding will be used
in 2025/26 to support the objectives of the new Housing Solutions Strategy, and
the Council will be required to provide the Scottish Government with an annual
report  detailing  the  use  of  the  funding  and  its  impact  in  preventing
homelessness and minimising the use of temporary accommodation.
5. People Implications
5.1 There are no additional people implications with regards the implementation of
the new Housing Solutions Strategy, however it is aligned to the services design
within the Housing Development and Homelessness Team.
6. Financial and Procurement Implications
As  indicated  in  4.6  the  Scottish  Government  will  be  distributing  another  
£8million for a final year to local authorities to assist with rapid rehousing.  The 
key aim  of  the  funds  is  preventing  homelessness  and  reducing  the  use 
of temporary accommodation. The amount allocation to West Dunbartonshire is
estimated to be in the region of £250k and will be used to meet the objectives of
the  Housing  Solutions  Strategy  as  the  successor  strategic  approach  to  the
West Dunbartonshire Rapid Rehousing Transition Plan.
One of the key aims is the delivery of the recommendations of the supported h
ousing review which has the potential to require a procurement exercise for
the future provision of temporary accommodation. The outcome of this review
4.6
6.1
6.2
Page 86

Page 87

and any potential procurement exercise will be submitted to a future meeting of
the Housing and Communities Committee in late 2025.
7. Risk Analysis
7.1        There are financial and regulatory risks associated with not being able to fully 
deliver  our  “More  than  a  Roof”  along  with  reputational  risks.  The
implementation of the strategy mitigates these risks through the delivery of the
action plan which addresses such risks.
If the Council were unable to deliver the strategic objectives it would have the
potential  to  increase  homeless  demand  and  requirement  for  temporary
accommodation  which  have  a  detrimental  financial  impact  on  the  Council’s
budgets.
7.3 As  with  all  Scottish  local  authorities,  West  Dunbartonshire  Council  currently
has regulatory engagement with the Scottish Housing Regulator regarding the
provision  of  homeless  services.  Failing  to  deliver  this  plan  could  lead  to
increased engagement from low to high.
8 Environmental Sustainability
The Council’s use of temporary accommodation is consistent with the delivery of
our housing maintenance programme and is part of our current and future
approach  to  strategic  housing  asset  management  which  will  continue  to
prioritise a ‘zero carbon’ approach to decision making and deliverability and this
will  be  done  the  aims  of  the  Housing  Asset  Management  Strategy  and  the
Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 There are no negative equalities impacts due to the introduction of a new Housing
Solutions Strategy, however preventing and responding to homelessness has a
significant  positive  impact  on  individuals  and  communities.  There  are  potential
positive  impacts  for  some  groups  as  noted  in  the  EIA  conducted  during  the
producing of this strategy in November 2024, EIA 1148. The EIA can be found as
Appendix 3 of this report.
10. Consultation
10.1 This strategy was written in partnership with all key stakeholders including staff
and  service  users  with  lived  experience  of  homelessness.  Local  authorities
have a statutory duty to involve, consult and engage with stakeholders relevant
to their policies and strategies. Part of the process of producing the initial draft
of  this  strategy  involved  a  wide  consultation  process,  to  gather  views  and
experiences of our service and identity areas we need to focus on.
10.2 Service user focus groups were held, online surveys for service users, staff an
dstakeholders were created, public consultation events and staff meetings and
focus group with our Housing Solutions Partnership.  The feedback from this
first round of consultation lead to the four objectives of the strategy.
7.2
Page 87

Page 88

10.3 Further  consultation  was  then  carried  out  on  the  draft  through  the  housing
solutions partnership meeting, West Dunbartonshire Tenants, and Residents
Organisation (WDTRO) and a public online survey to ensure we have captured
the most meaningful strategic objectives.
11.  Strategic Assessment
11.1 Having  considered  the  Council's  strategic  priorities,  this  report  contributes
significantly to all strategic priorities.
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive & Adaptable
Peter Barry
Chief Officer, Housing and Employability
Date: 12th February 2025
___________________________________________________________________
Person to Contact:      John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness Team,
Housing and Employability, telephone: 07793717981, email:
john.kerr@west-dunbarton.gov.uk
Claire McKay, Housing Development Coordinator,
Housing Development and Homelessness Team,
Housing and Employability: email claire.mckay@west-
dunbarton.gov.uk
Appendices: Appendix 1 – Housing Solutions Strategy, “More than a Roof”
Appendix 2 – Summary of Consultation
Appendix 3 – Equalities Impact Assessment
Background Papers:  
Ending Homelessness Together – High Level Action Plan;
Scottish Government/COSLA
https://www.gov.scot/binaries/content/documents/govscot/
publications/publication/2018/11/ending-homelessness-
together-high-level-action-plan/documents/00543359-
pdf/00543359-pdf/govscot%3Adocument
Letter from Paul McLennan, MSP, Minister for Housing on
Distribution of Funding for Rapid Rehousing Transition
Plans for 2024/25; 5 March 2024;
“Home at the Heart” West Dunbartonshire Council’s RRTP
Strategy 2019 - 2025.
West Dunbartonshire Council’s Local Housing Strategy
2022-2027;
Wards Affected:             All
Page 88

Page 89

1
More than a Roof
West Dunbartonshire Council’s
Housing Solutions Strategy
2025 - 2028
Item 10
Appendix 1
Page 89

Page 90

2
CONTENTS
Executive summary..........................................................................................3
1. Introduction and Background 5
2. Key Objectives …………………………………………………. 6
3. Baseline of Temporary Accommodation ...................................................17
4. Housing Solutions Action Plan...................................................................19
Appendix 1- Homeless Legislation................................................................21
Appendix 2- Homelessness Context in West Dunbartonshire........................25
Appendix 3 – Housing Context in West Dunbartonshire................................28
Appendix 4 – Consultation Summary ............................................................32
Appendix 5 – Equalities..................................................................................35
Page 90

Page 91

3
More than a Roof – Executive Summary Housing Solutions Strategy
West Dunbartonshire Council Housing Solutions Strategy 2025 – 2028
“More than a Roof” is West Dunbartonshire Council’s 6th Homeless Strategy with a
strong focus on finding housing solutions for those households in need. This strategy
covers the period from 2025 to 2028, which means it is aligned with our current Local
Housing Strategy which also runs until 2028.
“More than a Roof” aims to build on the achievements of “Home at the Heart”, our
Rapid Rehousing Transition Plan. It has been developed within the backdrop of a
Housing Emergency both locally and nationally, where demand is higher than ever,
and supply is reducing. At the time of writing, 13 Local Authorities have declared
housing emergencies, alongside a national declaration by the Scottish Government
on 15th May 2024.
The wider context includes recent legislative changes such as the introduction of the
Homeless Person’s (Unsuitable Accommodation) (Scotland) Amendment Order
2020, the commencement of the Local Connection and Intentionality provisions in
the Homelessness etc. (Scotland) Act 2003 and the on-going work of the Scottish
Government’s Homelessness Prevention and Strategy Group which is taking forward
actions identified by the Local Government and Communities Committee and the
Homelessness and Rough Sleeping Action Group (HARSAG) to improve the
experience of anyone already experiencing homelessness and prevent
homelessness altogether.
It is however, in advance of the Housing (Scotland) Bill 2024 being enacted which
will see a significant change and improvement to tenants’ rights but reinforcing
prevention as an action for landlords and other public bodies to take action to help
prevent or end homelessness.
The strategy was produced in partnership with key stakeholders, which importantly
included in-depth consultation with households experiencing homelessness and staff
working in the service and takes accounts of these opinions around how we can end
homelessness in West Dunbartonshire.
Following this process, four Key Objectives for West Dunbartonshire Council were
clear, and they are:
1. Homelessness is prevented by providing good quality advice and information to
enable informed decisions on personal housing solutions,
2. Where homelessness does occur households are rehoused quickly,
3. Review and ensure there are a wide range of support services available to prevent
and end homelessness, and
4. Working with partners to provide Interim options for temporary accommodation
and providing best quality temporary accommodation where required.
In order to achieve these objectives over the three-year period some of the actions
which will be taken include:
Page 91

Page 92

4
 Introducing a Housing Solutions Charter for provision of information and advice,
 Rolling out a common housing application form for social housing providers in
West Dunbartonshire,
 In line with the Housing Act liaising with relevant public bodies and landlords to
help them understand their responsibilities to ‘ask and act’ and explore actions to
prevent homeless,
 Exploring the option of creating a “one door” approach for all housing information
and advice which is consistent and robust, and which captures new demand
created from the Housing Act, 
 Regularly improving our online stock information and further promote so residents
have a better understanding of what our stock is like and what becomes available
to make informed decisions,
 To increase our supply through our acquisition programme focusing on medical
needs and larger family homes to meet need our own stock is unable to address,
 Reviewing the casework support assessment ensuring that it captures all support
needs of households to prevent and end homelessness,
 Exploring options to fund and provide more informal and practical type support
for particular groups that would not fall into prescribed housing support,
 The creation of a youth specialist housing support team as part of the service
restructure,
 Reviewing and creating protocols to ensure positive partnership working between
the housing solutions service and all HSCP partners,
 Creating a stock profile for dispersed temporary accommodation and review
against temporary accommodation standards,
 Explore support and accommodation options for young people 16-21yrs,
 Implementing the recommendations of the Supported Housing Review including
smaller and self-contained accommodation options.
Page 92

Page 93

5
Introduction
More than a Roof
This builds on our previous strategy “Home at the Heart” – our first rapid rehousing
transition plan, but our 5th homeless strategy, the key objectives of which were;
 Deliver a Whole Systems approach to the prevention of homelessness;
 Enable service users with low or no support needs to access settled housing quickly;
 To develop interim housing options which enable independent living and housing
sustainment; and
 Implement a Housing First model which enables the most excluded service
users to achieve housing sustainment.
Background
Scotland’s Homeless legislation is one of the strongest in the world yet ending
homelessness has not been achieved. However, external factors including a world
pandemic and then a subsequent cost of living crisis and the impacts that has had
on both supply and demand for housing has meant Scotland is facing a Housing
Emergency, with the Scottish Government declaring a Housing Emergency on 15th
May 2024. For full details of Scotland’s Homeless Strategic and Temporary
Accommodation legislation please see Appendix 1.
For further details on West Dunbartonshire Councils homeless context please see
Appendix 2.
West Dunbartonshire Council continues to experience high levels of deprivation. It
has seen a slight improvement around unemployment levels reducing to 3.4% in
2023 compared to the national average of 3.5%. Owner occupier continues to be the
largest housing tenure at 55% with social housing making up 24.5% of housing
stock. For further detail please see Appendix 3 for more context on West
Dunbartonshire Council.
Consultation
Local authorities have a statutory duty to involve, consult and engage with as wide a
range of their residents as possible. There has been a wide consultation process as
part of the formulation of this strategy, this has included:
 Service user focus group to help inform the survey which then went to all service
users, staff and other stakeholders,
 Hosted community events for further consultation,
 Hosted a stakeholder event through our Housing Solutions Partnership forum,
 Attended staff meetings
We thank all those involved in giving comment and time to contribute to this strategy.
Full details of the consultation can be found in Appendix 4.
Page 93

Page 94

6
Key Objectives
This strategy builds on the achievements of our previous strategy “Home at the Heart”
and takes account of the current context and pressures of housing emergency
declarations both locally and nationally along with low supply, high demand and
affordability.
It has been developed with key stakeholders, including households experiencing
homelessness through a consultation process and represents key asks from all
those involved which could help end homelessness in West Dunbartonshire.
The four key objectives for the strategy were clear and are as follows;
1. Homelessness is prevented by providing good quality advice and information to
enable informed decisions on personal housing solutions,
2. Where homelessness does occur households are rehoused quickly,
3. Review and ensure there are a wide range of support services available to prevent
and end homelessness, and
4. Working with partners to provide Interim options for temporary accommodation
and providing best quality temporary accommodation when required.
Page 94

Page 95

7
Objective one – Homelessness is prevented by providing good quality advice
and information to enabled informed decisions on personal housing solutions
A key aim will be ensuring residents of West Dunbartonshire are provided with good
quality advice and information that allows them to make informed decisions on their
personal housing solutions. Thus, strengthening a more preventative approach than
crisis as homelessness can only truly end with a robust prevention approach.
Housing options have been part of the Scottish Housing system since 2010 and
have been key to improving outcomes and lives. 
Housing Options and Advice focuses on people's personal circumstances, helping
them explore all options, including council housing, housing association homes and
private rented accommodation. It can also provide support for underlying issues that
can underpin housing problems such as debt, family breakup and mental health
problems.
This means that, rather than just making a homeless application officers can work
with other services to help people before they reach crisis point.
However, there is still more that can be done but wider than homeless services. 
Prevention is going to have a bigger role in Scotland’s housing sector with new
duties as part of the Housing Bill (Scotland) 2024 which has been published and will
be enacted during the time of this strategy. A significant part of the Bill, Part 5 will
introduce an ‘ask and act’ duty on social landlords and bodies, such as health boards
and the police, to ask about a person’s housing situation and act to avoid them
becoming homeless wherever possible. It also reforms provision for people
threatened with homelessness up to six months ahead and includes provisions for
tenants experiencing domestic abuse.
Prevention and housing options is ensuring households have the right information to
make informed choices and we offer daily housing options interview to enable this.
Table 1 – Outcomes for all closed Prevention cases in 2023/24
Outcomes 2023/24 2023/242
Number %
LA tenancy 36 9%
Private rented - assured tenancy 18 5%
Hostel - local authority 0 0%
Moved-in with friends/ relatives 8 2%
Other (known) 5 1%
Not known 2 1%
RSL (Housing Association) tenancy 14 4%
Private rented - short assured tenancy 4 1%
Residential care / nursing home 0 0%
Home Ownership - Low-Cost Home Ownership 0 0%
Home Ownership - Bought own home via other means 1 0%
Sheltered Accommodation 1 0%
Page 95

Page 96

8
Shared Property - LA 0 0%
Shared Property – RSL (Housing Association) 0 0%
Shared Property - Private Rented Sector 0 0%
Lodger 0 0%
Prison 0 0%
Hospital 0 0%
Lost contact with applicant 24 6%
Remained in current accommodation 179 46%
Made homelessness application to local authority 94 24%
All 386 100%
We have also created clear housing pathways for specific groups which increases
people being housed before a crisis need of becoming homeless. They include;
 Prison resettlement pathway
 Hospital Discharge
 No Homes for Domestic Abuse
 Armed Forces
ACTIONS
Key actions to help achieve Objective one:
 Restructure of the homeless service to a housing solution focus which will review
our delivery of housing options interviews and personal housing solutions plans,
 Introduce a Housing Solutions Charter for provision of information and advice,
 Roll out a common housing application form for social housing providers in West
Dunbartonshire to make it easier to apply for housing,
 Regularly updating the information about our stock and availability so that our
residents have realistic information of West Dunbartonshire housing stock
options available to them to enable them to make informed housing solution
decisions,
 Ask the Housing Solution Partnership to explore housing options and what it
means in West Dunbartonshire to further strengthen the advice and information
available to residents,
 In line with the Housing Act liaise with public bodies and landlords to help them
understand their responsibilities to ‘ask and act’ and explore actions to prevent
homelessness,
 Reviewing protocols and processes with partner agencies with the aim of
delivering positive outcomes for residents. This will include updating partner
contribution statements,
 Explore the option of creating a “one door” approach for all housing information
and advice which is consistent and robust and captures new demand created
from the Housing Act,
 Gain accreditation for information and advice.
Page 96

Page 97

9
Objective Two - Where homelessness does occur households are rehoused
quickly.  
Where homelessness hasn’t been prevented, ensuring households spend as little
time in temporary accommodation as possible and are rehoused permanently as
quickly as possible where they have no to low needs.
This continues on from the progress made from 2019 to 2025 where times were
reduced from 23 weeks to 17 weeks for those households with no to low support
needs.
The target time for this strategy will be 13 weeks for this group of households with no
to low support needs.
The last strategy, “Home at the Heart” had seen the demand numbers reduce until
other external impacts have seen demand increase again and is one of the
contributing factors for West Dunbartonshire Council declaring a Housing
Emergency on 1st May 2024.
Table 2 – Shows the numbers of households who presented as homeless and the
decisions in 2023/24,
Assessments 2023/24 value
Number of assessments 1104
Assessed as homeless 1,010
Assessed as homeless, unintentional (duty to house) 1000
Households assessed as homeless
- Rate per 10,000 households 235
Table 3 Shows the reduction in times achieved for those who had no to low needs
and were rapid rehousing during “Home at the Heart”;
2019/20 2020/21 2021/22 2022/23 2023/24
Avg time 15 wks 19 wks 16.5 wks 17.5 wks 17.5 wks
Of those households experiencing homelessness currently approaching West
Dunbartonshire for assistance around 64% have no to low support needs. This is the
group that can be rapidly rehoused, but all households should be rehoused as
quickly as possible. However, supply, type and need can also impact this. 
Page 97

Page 98

10
Table 4 – Shows the outcomes for all cases closed in 2023/24 for households
experiencing homelessness;
Housing Outcomes for Closed Homeless Presentations 2023/2024
Scottish Secure Tenancy 793
Private Rented Tenancy 19
Hostel 0
Bed & Breakfast 0
Returned to previous/ friends/ vol org. 150
Women’s Refuge 1
Residential care/nursing home/shared supported 0
Other - Known 78
Other - Not Known 19
No duty owed to applicant 96
Contact lost before duty discharge 68
All 1224
ACTIONS
Key actions to help achieve objective two:
 Regularly improving our online stock information and further promote so
residents have a better understanding of what our stock is like and what
becomes available to make informed decisions,
 To increase our supply through our acquisition programme focusing on medical
needs and larger family homes to meet need our own stock is unable to
address,
 Continue to lobby for increased affordable housing supply funding from the
Scottish Government to enable our programme to meet unmet need,
 Explore further promotion of the service Homeswapper to increase mutual
exchanges to meet other housing needs.
Page 98

Page 99

11
Objective Three –  Review and ensure there are a wide range of support services
available to prevent and end homelessness.
A key theme from our consultation and one of the asks from service users was more
support and not all in the current format that it is currently offered.
West Dunbartonshire Council homeless services have an in-house housing support
team along with a housing first support team. This is to meet the needs of those
households who experience homelessness in West Dunbartonshire. The housing
support team currently provide support while a household is homeless and in
temporary accommodation and up to 12 months after they are rehoused.
The recommendations that came from the review of West Dunbartonshire Council
residential supported accommodation are already taking shape from the last strategy
but will be complete during the time of this strategy.
The consultation also highlighted that the needs of households experiencing
homelessness since the last strategy have changed therefore an action of exploring
alternative support options has been included.
Support Data Tables
Table 5 shows that under our duty to assess support of our homeless presentations,
how many have support needs;
2023/2024
All assessed as unintentionally homeless/ threatened with homelessness 1119
Assessed under the Housing Support Regulations as % of all assessed
unintentionally 21%
Support Provided under the Housing Support Regulations as % of all assessed
unintentionally 19%
Table 6 shows of those with support needs how many categories of support they had:
2023/24
No support needs 651
1 support need identified 260
2 support needs identified 129
3+ support need identified 64
All 1104
Page 99

Page 100

12
Table 7 shows the categories of support:
2023/2024
Mental health problem 237
Learning disability 38
Physical disability 44
Medical condition 157
Drug or alcohol dependency 116
Basic housing management / independent living skills 130
From our data along with consultation feedback there are particular groups and
types of support which will have a focus.
Young people
Youth homelessness in West Dunbartonshire continues to be one of the highest in
Scotland. We have reduced numbers presenting as homeless with a change to our
allocation policy which gives priority to those young people at risk of homelessness. 
However, it still remains an area of concern within West Dunbartonshire. There is no
longer a youth specific residential supported accommodation in West
Dunbartonshire. Recognising that although this group have similar needs to all
households experiencing homelessness, they also have needs unique to them. 
Part of this objective will be exploring alternative support provision for young people
which can help prevent homelessness from occurring or if it does then help
rehousing and sustained resettlement.
Informal Support and Long-term support
Support can make the difference of a household sustaining their tenancy or not. As
part of homeless service duties as a local authority support needs must be assessed
for those presenting as homeless. This was in acknowledgment that access to
accommodation alone will not be sufficient to meet the needs of some of those that
are homeless or threatened with homelessness. This support is provided whilst they
wait for a permanent offer of housing and for a period of resettlement once
rehoused.
What has been highlighted from consultation is that for some people they need more
practical support and not necessarily at the resettlement part of their tenancy but
during their tenancy. Whist others may require ongoing support to ensure they can
sustain their tenancy but low level. These options either do not exist or are very
limited, demonstrating there is an unmet need.
We will work in partnership with other stakeholders to explore how this need can be
met. Other stakeholders will include other social landlords, HSCP colleagues in
health, addictions, social work, criminal and community justice along with those in
the third sector.
Page 100

Page 101

13
ACTIONS
Key actions to be taken forward to help achieve objective three:
 Review the casework support assessment ensuring that it captures all support
needs of households to prevent and end homelessness,
 Explore options to fund and provide more informal and practical types of support
for particular groups that would not fall into prescribed housing support,
 Make service users and other stakeholders aware of all support options available,
 Creation of a youth specialist housing support team as part of the service
restructure,
 Explore establishing and funding a housing first and other accommodation options
for young people,
 Review funding options to expand the existing Housing First Service, including
opportunities to prevent homelessness,
 Review and create protocols to ensure positive partnership working between the
housing solutions service and all HSCP partners1,
 Explore options in partnership with other key stakeholders for providing long term
housing support for tenants to sustain their tenancy and avoid homelessness.
1 HSCP Partner include; addictions services, mental health services, social work, criminal justice, community
justice.
Page 101

Page 102

14
Objective Four - Working with partners to provide Interim options for temporary
accommodation and ensuring best quality temporary accommodation is
provided
Partnership working is key within this objective.  Partners will include colleagues across
the council within housing operations, HSCP: addictions, mental health, social work and
criminal justice along with other social landlords and those in the third sector.
West Dunbartonshire Council pride ourselves on having a portfolio of temporary
accommodation in the community and have a very limited use of unsuitable
accommodation such as Bed & Breakfast. However, the continued pressures of
demand at the same time as a reduction in supply of permanent housing have put
pressures on our temporary supply meaning in the last two years we have seen
increased use of unsuitable accommodation. This is one of the contributing factors of
why West Dunbartonshire Council declared a Housing Emergency.
Recognising the needs and wants of our community are changing means a review of
the options that West Dunbartonshire Council offer as interim housing options during
an individual’s journey needs to be undertaken.
West Dunbartonshire Council currently uses 248 units of existing Council housing
stock to accommodate homeless households. This stock is dispersed and spread
throughout the council area.
Table 8: Shows the numbers of temporary accommodation stock by area and size.
Area/No. of rooms 1 2 3 4 Grand Total
ALEXANDRIA 12 40 16 68
CLYDEBANK 35 76 21 132
DUMBARTON 15 24 7 2 48
Grand Total 62 140 44 2 248
There are several residential supported accommodation projects within West
Dunbartonshire Council area. There are four supported accommodation projects in
West Dunbartonshire that provide direct access to people who are homeless. One of
these projects which is council owned and managed at Ashton View. Then there are
three projects across West Dunbartonshire that are managed by Blue Triangle
Housing Association. 
Table 9: Residential supported accommodation projects in West Dunbartonshire.
Supported accommodation project Ashton
View
Blue
Triangle
Alexandria
Blue
Triangle
Bonhill
Blue
Triangle
Clydebank
Number of places 20 10 8 13
Number of residents at year end
2023/24 14 10 8 11
Page 102

Page 103

15
Consultation on Temporary Accommodation
Service users, as part of their survey consultation were asked for feedback on the
temporary accommodation provided to them. Some of the feedback received
showed that;
 The type of accommodation of those who had stayed or were staying in
temporary accommodation were:
 66% flat in the community
 28% Residential supported
 6% other
 88% of those who stayed in temporary accommodation were satisfied with the
accommodation,
 78% were happy with the location of the temporary accommodation, and
 90% felt the accommodation met their needs.
The feedback indicates reviewing our temporary accommodation profile on a regular
basis should continue with a view of reviewing the location.
Conversions
Conversions are a great tool to offer where budgets allow. It is where a household
has their Short Scottish Secure Tenancy converted into a Scottish Secure Tenancy. 
This is an option where the households’ needs are being met in the dispersed
temporary accommodation and they wish to remain there. This isn’t an option for all,
but we will continue to have it as an option to offer to suitable households.
Young People
As West Dunbartonshire Council continue to see high presentations from young
people and as part of the consultation a young persons supported accommodation
was raised as an ask, this objective will include exploring alternative support and
accommodation options that meets the needs of young people.
Residential Supported Housing Accommodation
The action to review our current provision of residential supported accommodation
was carried out in the last strategy and work had begun taking forward the key
recommendations and will be complete during the time of this strategy. It will see
smaller and self-contained units being provided as supported accommodation.
Rapid access
A key recommendation from the review of residential supported accommodation was
a creation of a rapid access accommodation for a small number of households
where their needs cannot be met through residential supported accommodation or
through housing first support service. The reason being their needs are greater than
what housing services can offer, or they do not or are unable to engage with
services/supports.
Page 103

Page 104

16
ACTIONS
Key actions to achieve objective four:
 Create a stock profile for dispersed temporary accommodation and review
against temporary accommodation standards,
 Continue to offer a conversion programme within available budget,
 Explore support and accommodation options for young people aged 16-21
years,
 Implement recommendations of the residential supported housing review
including smaller and self-contained accommodation options, and
 Explore the delivery of rapid access accommodation in partnership with HSCP
colleagues.
Page 104

Page 105

17
Baseline position of Temporary Accommodation supply and use in West
Dunbartonshire
Temporary accommodation
The provision and use of temporary accommodation over the past 4 years has been
affected by the Covid-19 pandemic. The overall length of time spent in temporary
accommodation has decreased and is now lower than what it was in 2019/20 – pre
pandemic. However, the demand for temporary flats (LA dwellings) is still high. Letting
activity has yet to return to pre-pandemic levels and the number of households in
temporary accommodation remains high.
Table 10 shows type of temporary accommodation and average times.
Type of temporary
accommodation
2021/22
Ave
days
2022/23
Ave
days
2023/24
Ave
days
LA ordinary dwelling 126.5 135.5 149.7
Housing Association/RSL
dwelling 226.5 338.5 760
Hostel - local authority owned 70.6 37 34.2
Hostel – RSL 431.8 662.8 0
Hostel – other 91.5 110.2 116.1
Bed and breakfast 2.6 4.2 6.3
Women’s refuge 320 139 67.3
Private sector lease 0 0 0
Other placed by authority 541.8 0 0
Total (ALL) 119.4 100.8 97.7
West Dunbartonshire Council currently uses 248 units of existing Council housing
stock to accommodate homeless households as detailed in Table 8 on Page 20. 
This stock is dispersed and spread around the council area.
There are four residential supported accommodation projects in West
Dunbartonshire that provide direct access to people who are homeless. One is
council owned and managed, and three projects are managed by Blue Triangle
Housing Association. The details of each of these projects are in the table below.
Table 11: Residential supported accommodation projects in West Dunbartonshire.
Supported
accommodation project
Ashton
View
Blue
Triangle
Alexandria
Blue Triangle
Bonhill
Blue
Triangle
Clydebank
Number of places 20 10 8 13
Number of residents at
year end - 2023/24 14 10 8 11
Number that place was
offered and taken up
81
(91.0%) 19 (82.6%) 41 (74.5%) 34
(91.9%)
Occupancy rate -
2023/24-year end 75% 90% 72% 93%
Page 105

Page 106

18
Temporary Accommodation Modelling
West Dunbartonshire Council carries out a temporary accommodation modelling
exercise twice a year which provides an in-depth understanding of the support
needs of homeless households and the temporary accommodation options that
are required. The model allows us to meet the demands of the service, by
providing the right type of temporary accommodation. The model outputs tell us
what type of accommodation is required by area and size. 
The latest modelling exercise used homeless cases in 2023/24. This model
focused on dispersed temporary accommodation. A residential supported
accommodation review is being undertaken to establish the need and demand for
this option.
The outputs showed that while presentations have decreased by 10% between
2022/23 and 2023/24 dispersed stock levels have decreased by 12%. This
means there is a shortfall between the current supply and what is required. 
This shortfall is across all areas – Clydebank, Dumbarton and Alexandria which
would be associated with increased use of unsuitable accommodation. In
addition, in each area there are not enough one-bedroom properties, too many
two- and three-bedroom properties and a small shortfall of four and five bed
properties. However, this is in line with West Dunbartonshire Council housing
supply. It should also be noted that increasing dispersed temporary
accommodation means reducing the availability of supply for permanent housing
therefore all impacts have to be assessed and managed.
Page 106

Page 107

19
More than a Roof Action Plan 2025 – 2028
Objective One
1. Restructure of the homeless service to a housing solution focus which will review our delivery of housing options interviews and personal
housing solutions plans,
2. Introduce a Housing Solutions Charter for provision of information and advice,
3. Roll out a common housing application form for social housing providers in West Dunbartonshire to make it easier to apply for housing,
4. Regularly updating the information about our stock and availability so that our residents have realistic information of West Dunbartonshire
housing stock options available to them to enable them to make informed housing solution decisions,
5. Ask the Housing Solution Partnership to explore housing options and what it means in West Dunbartonshire to further strengthen the
advice and information available to residents,
6. In line with the Housing Act liaise with public bodies and landlords to help them understand their responsibilities to ‘ask and act’ and
explore actions to prevent homeless,
7. Reviewing protocols and processes with partner agencies with the aim of delivering positive outcomes for residents. This will include
updating partner contribution statements,
8. Explore the option of creating a “one door” approach for all housing information and advice which is consistent and robust and captures
new demand created from the Housing Act, and
9. Gain Accreditation for information and advice.
Objective Two
1. Regularly improving our online stock information and further promote so residents have a better understanding of what our stock is like and
what becomes available to make informed decisions,
2. To increase our supply through our acquisition programme focusing on medical needs and larger family homes to meet need our own stock is
unable to address,
3. Continue to lobby for increased affordable housing supply funding from the Scottish Government to enable our programme to meet unmet
need, and
4. Explore further promotion of the service Homeswapper to increase mutual exchanges to meet other housing needs.
Page 107

Page 108

20
Objective Three
1. Review the casework support assessment ensuring that it captures all support needs of households to prevent and end homelessness,
2. Explore options to fund and provide more informal and practical type support for particular groups that would not fall into prescribed
housing support,
3. Make service users and other stakeholders aware of all support options available,
4. Creation of a youth specialist housing support team as part of the service restructure,
5. Explore establishing and funding a housing first and other accommodation options for young people,
6. Review funding options to expand the existing Housing First Service, including opportunities to prevent homelessness,  
7. Review and create protocols to ensure positive partnership working between the housing solutions service and all HSCP partners2,
8. Explore options in partnership with other key stakeholders for providing long term housing support for tenants to sustain their tenancy and
avoid homelessness.
Objective Four
1. Create a stock profile for dispersed temporary accommodation and review against temporary accommodation standards,
2. Continue to offer a conversion programme within available budget,
3. Explore support and accommodation options for young people aged 16-21 years,
4. Implement recommendations of the residential supported housing review including smaller and self-contained accommodation options,
and
5. Explore the delivery of rapid access accommodation in partnership with HSCP colleagues.
2 HSCP Partner include; addictions services, mental health services, social work, criminal justice, community justice.
Page 108

Page 109

21
Appendix 1- Homelessness Legislation
Strategic Policy Framework
The 1977 Act, now consolidated into Part II of the Housing (Scotland) Act 1987, placed the
responsibility for meeting homeless persons’ needs on local authority housing departments
subject to national guidance.
This Housing (Scotland) Act 2001 brought about a series of changes that included:
 Local authorities had to assess homelessness within their area and to submit strategies
and approaches for its prevention and mitigation of homelessness;
 Local authorities had a duty to ensure advice and information is available in their area
and free of charge;
 Rights of individual homeless people strengthened with the right to temporary
accommodation even if in non-priority need; and
 Registered Social Landlords were given a duty to comply with requests from local
authorities to accommodate unintentionally homeless households in priority need within
six weeks.
The Homelessness (Scotland) Act 2003 brought about fundamental changes to
homelessness in Scotland. One of these changes was the ambitious target of abolition of
priority need by 2012. This meant that anyone who is unintentionally homeless will be given
the right to temporary accommodation and a statutory duty to have permanent
accommodation found by the local authority. In December 2005, the then Scottish
Executive issued a Ministerial Statement on how the Act was to be implemented. The main
requirements of the Act were:
 Priority need assessment is to be abolished by 2012; and
 The requirement of landlords and creditors to notify the relevant local authority when
they raise repossession proceedings.
The Housing (Scotland) Act 2010 placed a duty on local authorities to assess the housing
support needs of homeless or threatened with homeless households, where they believe
that households are in need of a prescribed housing support service. It also states that local
authorities must ensure that this support is provided. This duty was enacted on 1st June
2013.
In 2012 priority need was abolished within Scotland. West Dunbartonshire Council was one
of the first councils within the country to meet this target.
The Scottish Governments approach to homelessness has now taken the approach of
homelessness prevention and housing options.  In April 2014 the Scottish Government
launched Prevent 1.  Prevent 1 is a measurement tool developed to monitor and evaluate
activity around housing options and homelessness prevention work undertaken by local
authorities.  The data capture and reporting statutory and local authorities return in quarterly
to the Scottish Government in the same way HL1 is returned. HL1 is our data return to the
Scottish Government for every household who presents as homeless to West Dunbartonshire
council which is then used as a measuring tool.
The Programme for Government published on 5 September 2017 addressed issues
surrounding homelessness and rough sleeping and plans to tackle them. Following these
Page 109

Page 110

22
renewed commitments the Homelessness & Rough Sleeping Action Group (HARSAG) was
established.  The group set out a series of recommendations.
In 2018 the Scottish Government and COSLA published the Ending Homelessness
Together Action Plan which set out the shared direction towards ending homelessness.
This action plan was informed by recommendations received from the HARSAG.
HARSAG was reconvened in response to the pandemic. The HARSAG II recommendations
included four areas with 105 recommendations.  It recognised that ending homelessness
requires more than providing housing.  It focused on joint working, support plans,
connections with the community, personal health and wellbeing and a sense of purpose. 
Following recommendations made by (HARSAG) and the Ending Homelessness Together
Action Plan, and consultations with local authorities, the Scottish Government commenced
the Local Connection and Intentionality provisions from the Homelessness etc. (Scotland)
Act 2003.
1. In November 2019 the legal duty for local authorities to investigate intentionality
became a discretionary power.
2. In November 2022 anyone who does not have a local connection to the council they
present as homeless too will no longer be referred to the local authority they have a
connection to.  Instead, the local authority they presented to will have a duty to
accommodate the household and find permanent/settled accommodation.  The
Homeless Persons (Suspension of Referrals between Local Authorities) (Scotland)
Order 2022 was laid in Parliament on 20 September
Temporary Accommodation Legislation
As a local authority West Dunbartonshire Council has a duty to provide temporary
accommodation in terms of the Housing (Scotland) Act 1987 as amended by the Housing
(Scotland) Act 2001 and Homelessness etc. (Scotland) Act 2003.  This is a duty to
temporarily accommodate anyone who is believed to be homeless until an assessment
decision has been made and beyond if assessed as homeless.
In order to ensure households, especially those with children, were being placed in
appropriate temporary accommodation the Government introduced the Unsuitable
Accommodation Order in 2004.  This Order required local authorities to ensure households
with children and pregnant women are not placed in unsuitable accommodation unless
exceptional circumstances apply, The Homeless Persons (Unsuitable Accommodation)
(Scotland) Order 2014 reduced the days in unsuitable accommodation from 14 to 7.   The
Homeless Persons (Unsuitable Accommodation) (Scotland) Amendment Order 2020
extended the order to all homeless households.
The Scottish Housing Charter
The Housing (Scotland) Act 2010 included the requirement for a Scottish Social Housing
Charter.  Our approach to tackling homelessness is linked to the Scottish Social Housing
Charter, which sets out the outcomes and standards that all social landlords should be
delivering for their tenants and other customers.
The Charter does not replace the legal duties that apply to social landlords, but:
“describes the standards and outcomes that tenants and other customers should expect
social landlords to achieve.”
Page 110

Page 111

23
The first Charter came into effect on 1 April 2012 and was reviewed during 2016 and 2021.
The resulting revised Charter came into effect from 1 November 2022 and continues to
apply until the Parliament approves a further revised Charter. The Council must report on
these outcomes annually to the Scottish Housing Regulator and makes this information
available to the public each year in October
The following Charter Outcomes relate directly to this strategy:
Outcome 12 – Homeless people
Local councils perform their duties on homelessness so that:
 people who are homeless or at risk of homelessness get prompt and easy access to
help, advice and information; are provided with suitable, good-quality temporary or
emergency accommodation when this is needed; and are offered continuing support to
help them get and keep the home they are entitled to
This outcome describes what councils should achieve by meeting their statutory duties to
homeless people.
The following Outcomes are also relevant:
Outcomes 7, 8, 9 – Housing Options
Social landlords work together to ensure that:
 people looking for housing get information that helps them make informed choices and
decisions about the range of housing options available to them; and
 tenants and people on housing lists can review their housing options.
Social landlords have a role to prevent homelessness and should ensure that:
 people at risk of losing their homes get advice and information on preventing
homelessness.
These outcomes cover landlords’ duties to provide information to people looking for housing
and advice for those at risk of becoming homeless. These duties include helping tenants
and people on housing lists to review their options to move within the social housing sector
or to another sector.
Wider Strategic Policy Framework
Homelessness is a complex issue and is rarely solved by housing alone.  The council as a
whole and all the statutory and voluntary partners must work together to prevent and reduce
homelessness.  With this in mind the homelessness and temporary accommodation
strategy does not stand alone but is set within and contributes to the Council’s wider
strategic framework.
West Dunbartonshire Council’s Strategic Plan 2022 - 2027 is the road map for the
Council for the next five years.  It sets out the vision for the area led by priorities identified in
partnership with the people who live, work and trade here. The following are the key
strategic priorities for the future:
 Our Communities - Resilient and Thriving;
Page 111

Page 112

24
 Our Environment - A Greener Future;
 Our Economy – Strong and Flourishing; and
 Our Council – Inclusive and Adaptable.
Your West Dunbartonshire, Your Place Local Outcome Improvement Plan sets out the
Community Planning West Dunbartonshire (CPWD) long term vision for 2017 - 2027. The
plan builds on the Single Outcome Agreements that have gone before it and reaffirms the
partnership’s shared vision of a West Dunbartonshire that’s ‘A great place to live, work and
visit’.
The Community Plan has several links to the Housing Solutions Strategy.  This includes the
following outcomes;
 Enhanced quality and availability of affordable housing options
 Housing options are responsive to changing needs over time
West Dunbartonshire Health and Social Care Partnership Strategic Delivery Plan
2023–2026: Improving Lives Together sets out the Health Social Care Partnership
(HSCP) four strategic outcomes:
1. caring communities,
2. safe and thriving
3. communities, equal communities and
4. healthy communities.
These outcomes build on the previous strategic plan, learning and the data from
comprehensive strategic needs assessment
The Local Housing Strategy 2022-2027 (LHS) sets out how West Dunbartonshire Council
and its partners plan to address the housing, and housing related opportunities and
challenges, over the next five year.  The 5 key themes of the strategy and their main
components are:
1. Housing Need and Demand;
2. Promoting Quality Homes;
3. Homelessness and Housing Options;
4. Place and Community;
5. Supported, Specialist and Particular Needs Housing.
Page 112

Page 113

25
Appendix 2 – Homelessness Context
Homelessness context in West Dunbartonshire
The objectives in our previous strategies have resulted in incidences of homelessness in
West Dunbartonshire reducing significantly in recent years.
Homelessness in West Dunbartonshire
Homelessness Strategy 2008/13 2008/09 2012/13 Reduction
Homeless applications 2140 1364 36%
Homelessness Strategy 2013/16 2013/14 2015/16 Reduction
Homeless applications 1368 1124 18%
Homelessness Strategy 2017/20 2017/18 2019/20 Reduction
Homeless applications 1048 1022 2.6%
Current homelessness position
There was little difference in the number of homeless applications between 2021/22 and
2022/23 however, there has been a decrease of 10% in 2023/24. However, the numbers
assessed with a duty to house continue to increase, meaning an increase in demand for all
forms of temporary accommodation and for settled accommodation.
Homeless applications and assessments2021/22 2022/23 2023/24
Homeless applications 1205 1217 1095
Total assessments 1199 1216 1104
Assessed with a duty to house 1019 1045 1008
% with duty to house 84.99% 85.94% 90.67%
At the 31 March 2024, West Dunbartonshire had 423 open homeless cases having been
assessed with a duty to rehouse.
The reason for homeless applications shows that consistently the core drivers of
homelessness in West Dunbartonshire are households being asked to leave their
current accommodation and disputes within a household (both violent and non-violent),
accounting for just over 70% of all applications.
2021/22 2022/23 2023/24Reason for homeless
application No. % No. % No. %
Termination of tenancy/
mortgage due to rent arrears/
default on payments
6 0.50% 23 1.90% 16 1.46%
Other action by landlord
resulting in the termination of
the tenancy
58 4.80% 62 5.20% 31 2.83%
Applicant terminated secure
accommodation 24 2.00% 13 1.10% 20 1.83%
2021/22 2022/23 2023/24Reason for homeless
application No. % No. No. %
Page 113

Page 114

26
Loss of service/tied
accommodation 2 0.20% 4 0.30% 3 0.27%
Discharge from
prison/hospital/ care/other
institution
45 3.70% 48 4.00% 51 4.66%
Emergency (fire, flood, storm,
closing order from
Environmental Health etc.)
16 1.30% 13 1.10% 8 0.73%
Forced division and sale of
matrimonial home 5 0.40% 9 0.70% 13 1.19%
Other reason for loss of
accommodation 31 2.60% 28 2.30% 22 2.01%
Dispute within household:
violent or abusive 242 20.10% 209 17.40% 187 17.08%
Dispute within household/
relationship breakdown: non-
violent
227 18.90% 225 18.70% 229 20.91%
Fleeing non-domestic violence 50 4.20% 38 3.20% 36 3.29%
Harassment 26 2.20% 19 1.60% 38 3.47%
Overcrowding 14 1.20% 9 0.70% 2 0.18%
Asked to leave 377 31.30% 412 34.30% 367 33.52%
Other reason for leaving
accommodation/household 80 6.70% 90 7.50% 72 6.58%
All 1203 100% 1202 100.00% 1095 100.00%
West Dunbartonshire Council continues to perform very well in relation to the benchmark
set by the Code of Guidance on Homelessness and is largely meeting its requirements to
assess homeless applications within 28 days. In 2021/2022, 5 applications were
assessed outwith this timescale. However, in 2022/2023, 11 applications were assessed
outwith the 28 days. Whilst this is an increase, 99% of applications were still assessed
within the 28 days. In 2023/2024 this decreased to 6 applications.
Length of time to assess
application 2021/2022 2022/2023 2023/2024
Same day 80 6.70% 82 6.84% 114 10.33
%
1-6 days 286 23.90% 301 25.10
% 287 26.00
%
7-13 days 222 18.60% 256 21.35
% 276 25.00
%
14-28 days 603 50.40% 549 45.79
% 421 38.13
%
28-55 days 4 0.30% 10 0.83% 5 0.45%
56+ days 1 0.10% 1 0.08% 1 0.09%
All applications 1196 100% 1199 100% 1104 100%
The number of homeless households who reported rough sleeping at time of presentation
over the past 3 years is outlined in the table below.  It shows a drop in people who have
Page 114

Page 115

27
slept rough in the 3-month preceding application with those who slept rough the night
before presenting as homeless also showing a decrease from 2022/23 to 2023/24.
Households reporting rough sleeping at
presentation 2021/22 2022/23 2023/24
Slept rough during the 3 months preceding application 79 74 62
Slept rough on the night preceding application 37 38 31
As part of our homelessness assessment, further questions are asked to better understand
the reasons for instances of rough sleeping that are reported.  An annual analysis of any
households reporting rough sleeping prior to presentation is carried out. Findings from this
exercise show that the vast majority state that they have spent part of an evening rough
sleeping in emergency circumstances prior to presenting as homeless and no extended
periods of rough sleeping have been identified. This continues to be monitored as part of our
wider Performance Management Framework.
The average case duration to discharge of duty reduced in 2023/24 and is now lower than
what it was pre pandemic in 2019/20.
Average case duration to discharge of duty2021/22 2022/23 2023/24
Average time to discharge duty 31.3 28.8 26.8
Outcomes
The outcomes of all homeless applications closed during the past three years are
outlined in the table below:
Outcomes 2020/21 2021/22 2022/23
Scottish Secure Tenancy 750 737 793
Private Rented Tenancy 19 7 19
Hostel 1 1 0
Bed & Breakfast 0 0 0
Returned to previous/ friends/ vol org. 129 121 150
Women’s Refuge 2 3 1
Residential care/nursing home/shared
supported 0 0 0
Other - Known 65 56 78
Other - Not Known 12 27 19
No duty owed to applicant 174 165 96
Contact lost before duty discharge 43 45 68
All 1195 1162 1224
A higher proportion of all cases being closed are being housed in settled accommodation. 
In the last 3 years there has been an improvement in the rate of tenancy sustainment for
homeless households within West Dunbartonshire.  However, in 2022/23 this has
decreased slightly and has remained at a similar level for 2023/24.
Tenancy sustainment (homeless lets) 2020/21 2021/22 2022/23 2023/24
West Dunbartonshire Council 91.6% 94.6% 92.8% 92%
Page 115

Page 116

28
Appendix 3 - Housing Market
Housing market in West Dunbartonshire
West Dunbartonshire is situated west of Glasgow, north of the River Clyde and is one
of the smallest Scottish councils in terms of area (31st out of 32) and population
(25th)3.  Across the three main areas of Clydebank, Dumbarton and the Vale of Leven
there is great diversity, ranging from the densely populated urban centre of Clydebank
to the more rural setting of the Loch Lomond and Trossachs National Park. The area
faces a number of challenges including a reducing population, high levels of economic
deprivation and relatively poor health outcomes.
Life expectancy in West Dunbartonshire is alarmingly low, with women living an average
of 78.4 years and men 73.4 years, both of which are the second lowest in Scotland.4
This reflects the wider issues of deprivation and health inequality in the region.
Some parts of West Dunbartonshire are prosperous, but significant inequalities exist
between communities. Forty-eight of the 121 data zones (population units) across
West Dunbartonshire are among the 20% most deprived data zones in Scotland.5
West Dunbartonshire continues to see an increase in its share of the most deprived
areas in Scotland, from 35 to 38 since 2016.
In December 2023, unemployment in West Dunbartonshire was 3.4%, compared to
the Scottish average of 3.5%.6 This marks an improvement from previous years as
now below the national average.
On 30 June 2022, the population of West Dunbartonshire was 88,270. This is a
decrease of 0.3% from 88,560 in 2021. The majority of the population falls within the
45 to 64 years age bracket, with a working-age population of 25,517 in 2022. The
older population (75 and over) comprised the smallest group, with 7,604 individuals.7
According to Audit Scotland8, by 2039 the population of West Dunbartonshire is
projected to decrease by 6.7% whereas the population of Scotland overall is projected
to increase by 7.5%.
Furthermore, in West Dunbartonshire by 2039:
• the number of people aged 75 and over is projected to increase by 71% (to
approximately 12,000) – increasing the demand for health and social care
services for older people as well as the type and design of properties required to
house them;
• the number of people of working age is projected to fall by 20% (to 46,500) – and
a lack of local workforce could potentially make the area less attractive to some
businesses;
• the number of children and young people aged 0-15 years is forecast to fall by
12.1% (to 13,700) – affecting services such as schooling and education; and
 the number of single person households is also expected to increase by 23% over
the period 2012 to 20379
3 Best Value Assurance Report West Dunbartonshire Council, Audit Scotland, June 2018
4 National Records of Scotland, West Dunbartonshire Council Area Profile
5 SIMD 2020 council area profile and analysis: West Dunbartonshire, Scottish Government, January 2020
6 Employment, unemployment and economic activity in West Dunbartonshire, Office for National Statistics,
May 2024
7 National Records of Scotland, West Dunbartonshire Council Area Profile
8 Best Value Assurance Report West Dunbartonshire Council, Audit Scotland, June 2018
Page 116

Page 117

29
The estimated number of dwellings within West Dunbartonshire is 43,364.9 Over half
of the stock is owner occupied and over a third is social housing. The share of private
rented properties within West Dunbartonshire is considerably less than the Scottish
average of 13%. The breakdown of its stock by tenure is outlined in Table 1 below: 10
Table 1 – Housing Tenure in West
Dunbartonshire
Tenure Total
Number
%
Council Housing 10,624 24.5%
Registered Social
Landlords
5,507 12.7%
Private Rented Sector 2,862 6.6%
Owner Occupation 24,067 55.5%
Rent Free 304 0.7%
Total 43,364 100%
There is a total of 16,131 social rented properties in West Dunbartonshire, this is a
combination of Council owned properties and those of Registered Social Landlords.
The number of households living in the social rented sector in West Dunbartonshire is
significantly higher than in Scotland as a whole, where 23% of households live in the
social rented sector.11  As is the trend across Scotland, social rented properties remain
in high demand in West Dunbartonshire and as such there is an ambitious Strategic
Housing Investment Plan to increase the number of affordable homes in the area.
In addition, the share of private rented tenancies in West Dunbartonshire has
fluctuated significantly over the past decade reflecting the relatively small nature of the
sector and its ability to expand and contract based upon changing economic
conditions. In 2016, 13% of properties in West Dunbartonshire where private rented, in
comparison to 6.6% in 2023. 12 This decline can be linked to contemporary
developments such as Covid-19 and the cost-of-living crisis and the affordability of the
private rented sector.
Table 2 below highlights the average Private Rented Sector rents for West
Dunbartonshire in 2024 and shows there is a clear misalignment between private
sector rents and the Local Housing Allowance in West Dunbartonshire. The table also
shows that the gap between private sector and the local housing allowance rents in
West Dunbartonshire increases along with the property size.
Table 2 – Private Rented Sector Rents
Property Size 1 bed 2 bed 3 bed 4 bed 1 bed shared
PRS – Average Monthly Rent £534 £726 £895 £1220 £521
9 https://www.west-dunbarton.gov.uk/media/zkxpxcbt/wdc-in-numbers-2023-v9.pdf
10 https://www.west-dunbarton.gov.uk/media/zkxpxcbt/wdc-in-numbers-2023-v9.pdf
11 Local Housing Strategy 2022-2027, West Dunbartonshire Council
12 Scottish Household Survey (SHS) Housing Data Tables 2022, December 2023
Page 117

Page 118

30
Monthly Local Housing
Allowance13
£473.72 £593.36 £673.14 £947.40 £349.05
Monthly Difference £60.28 £132.64 £221.86 £272.60 £171.95
In Scotland, the number of lone adult households is projected to increase by 35% over
the 25-year period between 2012 and 2037.  In West Dunbartonshire, the number of lone
adult households is projected to increase by only 23% in the same period. The number of
larger households in West Dunbartonshire is projected to fall, with the number of
households of 2 or more adults with children decreasing by 34% over the 25-year period.
The average household size is projected to decrease from 2.13 in 2012 to 1.93 in 2037.14
The Council plays a leading role in the West Dunbartonshire Community Planning
Partnership, known as Community Planning West Dunbartonshire (CPWD). The
partnership includes representatives from the Council, health board, police and fire
services and local charities and voluntary organisations. The Community Empowerment
(Scotland) Act 2015 requires community partnerships to produce a Local Outcomes
Improvement Plan (LOIP) for its area. CPWD’s LOIP for 2017-2027 was approved in
October 2017.
Aligned to this is the Council’s Local Housing Strategy, which sets out the vision for
Housing across West Dunbartonshire for the period 2022/27 and reinforces the
following 5 key objectives:
 Ensuring people have access to affordable housing, which is in the right location
and is suitable for their needs;
 Ensuring that all residents live in good quality housing regardless of tenures;
 Ensuring that homelessness is minimised through prevention and early
intervention measures;
 Providing good quality neighbourhoods and housing services where all people feel
safe and secure; and
 Ensuring people with particular needs have access to suitable housing with any
necessary support, to optimise their independence and well-being.
Housing Supply Target and Investment
West Dunbartonshire Council have set the following Housing Supply Targets:
Table 3 – Housing Supply Targets
2024-2029
total
Per annum
Private 750 150
SR/BMR 400 80
Total 1,150 230
Source: Schedule 7 SDP
13 https://www.west-dunbarton.gov.uk/benefits-and-grants/housing-benefit/local-housing-allowance/local-
housing-allowance-rates/
14 Local Housing Strategy 2017-2022, West Dunbartonshire Council
Page 118

Page 119

31
Over the 5-year period leading to 2029/30, there are 762 projected completions of
affordable new supply housing to be developed by social rented landlords within the
area. This includes the provision of 25 shared ownership properties.
Therefore, the number of social rented dwellings within West Dunbartonshire is set
to increase by around 5% which will impact positively on access to housing for
homeless households due to our commitment of ensuring our lettings target for
homelessness also applies to new supply.
The demographic profile in West Dunbartonshire also presents challenges in that it is
predicted to both age and decline faster than the Scottish average. The household
composition is continuously changing, demand for larger family homes has been growing
since the Covid-19 pandemic, alongside the increase of single person households on our
housing waiting list. This, therefore, impacts on the design and type of properties required in
West Dunbartonshire, which will also be influenced by the Scottish Government’s aim to
supply 110,000 affordable homes, welfare reform and contemporary developments such as
Covid and the cost-of-living crisis affecting people’s affordability of housing and thus creating
pressure on landlords to supply both affordable and desirable housing.
Page 119

Page 120

32
Appendix 4 - Consultation
Local authorities have a statutory duty to involve, consult and engage with
stakeholders relevant to their policies and strategies. Part of the process of drafting
this strategy involved a wide consultation process, to gather views and experiences of
our service and identity areas we need to focus on. This included the following:
 Hosting a focus group at Ashton View to talk to current residents about their
experiences;
 Attending various team meetings to discuss the strategy and the consultation
process. We attended the following team meetings:
o Homeless Caseworker and Housing Options
o Housing Services
o Supported Accommodation
o Housing First
o Resettlement
o Homeless Accommodation;
 An online survey for staff in all of the teams listed above;
 A survey for people currently experiencing homelessness and those who have had
experience of homelessness in the last two years. This survey was online and was
distributed to all staff and partners via email and service users via text message, as
well as being advertised on social media and the council website. Paper copies were
also made available;
 Consulting with partners and stakeholders via an online survey, including:
o Addictions
o Mental Health
o Adult Social Care
o Criminal/Community Justice
o Housing Associations
o NHS
o Third Sector Support
o Throughcare
o WDC Housing Operations
o Woman’s Aid;
 Public consultation events were hosted, one in Dumbarton and one in Clydebank. 
The events were for anyone but people with lived experience of homelessness were
encouraged to attend. The strategy was discussed, and paper copies of the survey
were distributed;
 Further stakeholder consultation via our quarterly Housing Solutions Partnership
meeting and WDTRO.
The main areas of focus within the consultation were:
 Homelessness Prevention
 Housing Options
 Housing Support 
 Temporary/Supported Accommodation
 Information and Advice.
Page 120

Page 121

33
Key themes identified from consultation:
Service users
 The majority of service users said there was nothing that could have been done
to prevent their homelessness.
 Most were happy with the location of their temporary accommodation and felt it met
their needs.
 Most service users felt they are/were listened to by staff; however, some reported a
feeling of being unheard and a lack of choice in where they live.
 More than half felt they were provided with good quality information that met their
needs; however, some reported a lack of communication with staff and feeling of not
being informed enough about their case.
 That there was enough support from West Dunbartonshire Council was a reoccurring
theme throughout, with service users reporting that more help was required to settle
into their new tenancy in relation to benefits, employment, mental health and
addiction.
 The most said things service users said they needed to end their homelessness were:
o More available housing options
o More/continuous support (financial, employment, mental health and addiction)
o To be heard
o To feel safe
o Understanding staff.
Staff & Stakeholders
 Both groups largely agreed that West Dunbartonshire Council do enough to prevent
homelessness, however stated that more resources and greater partnership working
were required to improve service.
 All stakeholders believe their service has a role to play in preventing
homelessness in West Dunbartonshire. 
 There was a shared consensus that there aren’t enough housing options available in
West Dunbartonshire, due to a lack of affordable housing, issues with Private Rented
Sector affordability and accessibility, and lack of financial support.
 Both reported a lack of available housing support options in West Dunbartonshire
Council, highlighting gaps in support for those with low support needs/at risk of
homelessness, as well as those with more complex needs.
 The lack of temporary accommodation options available in West Dunbartonshire
Council was reinforced throughout the process, with both staff and stakeholders
reporting that more specific accommodation was required to meet client need i.e.
young people and those with more complex needs.
 There was agreement that the needs of households experiencing homelessness have
changed in the last 5 years in terms of growing support needs, lack of suitable
accommodation and external pressures.
 There was a shared consensus that West Dunbartonshire Council /everyone should
be doing more to help households experiencing homelessness to be rehoused
quicker through improved collaborative working and communication, in terms of
ensuring households are tenancy ready before moving on from temporary
Page 121

Page 122

34
accommodation and greater housing options – including building more houses and
bringing existing stock up to standard.
 Most staff said they were confident in providing good quality information and advice to
households, highlighting the importance of managing expectations and regular
training to ensure they are up to date with legislative changes.
 The top priorities that stakeholders would like to see in the new strategy were:
o More new housing supply
o More support (especially for young people)
o More funding
o Better communication among partners
o Multi agency working
o ‘Scaling up’ of Housing First.
Outcomes of consultation
The above information was taken into consideration in the development of the new
strategy and either included within the main document or the action plan.  It is evident
from the consultation process that there is a strong need for a greater collaborative
approach in the prevention of homelessness.  There is also a need for increased and
alternative housing support options to meet growing support needs.  Such themes,
alongside the need for more available housing options and temporary accommodation
that meets identified need have informed the objectives and actions of the new strategy.
Consultation on the published draft
Further consultation was carried out once a draft was produced which service users, staff
and stakeholders all fed back on.  Strong support for the objectives of the strategy was
received.  Feedback on actions was more mixed but where responses indicated more
was required, they referred to actions which were in the plan including strong partnership
working and specific youth support and accommodation.  The service we provide is
person centre, therefore all needs of everyone are taken into account when providing
information and support.
Page 122

Page 123

35
Appendix 5 – Equalities
The Council is committed to fulfilling the three key elements of the general equality
duty as defined in the Equality Act 2010:
 Eliminating discrimination, harassment and victimisation,
 Advancing equality of opportunity between people who share a protected
characteristic and those who do not,
 Fostering good relations between people who share a protected characteristic
and those who do not. This includes challenging prejudice and building
understanding.
Protected characteristics:
 age
 disability
 gender reassignment,
 pregnancy and maternity
 race, this includes ethnicity, colour and national origin
 religion or belief
 sex
 sexual orientation
 marriage/civil partnership (for which only the first duty is applies)
Everyone has 'protected characteristics', but it is the treatment individuals and
groups receive, the level of autonomy they have, and the positive or negative
outcomes for them, that are its focus. Therefore, the Council will:
 Remove or minimise disadvantages experienced by people due to their
protected characteristics,
 Meet the needs of people from protected groups where these are different
from the needs of other people,
 Encourage people with protected characteristics to participate in public life or
in other activities where their participation is disproportionately low.
While it is a legal requirement, these steps contribute to fairer, more efficient and
more effective services. Therefore, the Council will:
 take effective action on equality
 make the right decisions, first time around
 develop better policies and practices, based on evidence
 be transparent, accessible and accountable
 deliver improved outcomes for all.
To ensure our processes comply equality data is asked when applications are made
to homeless services to understand the needs of our residents. This ensure there
are no unintentional or negative impacts of our strategies to any particular group. 
Below details data we hold on for any household experiencing homelessness who
provided the data;
Presentations by year and age
Age/Year 2021/2022 2022/2023 2023/2024
16 - 17 37 3% 37 3% 21 2%
18 - 25 306 25% 318 26% 265 24%
26 - 59 796 66% 800 66% 741 68%
60+ 66 5% 62 5% 68 6%
All 1205 100% 1217 100% 1095 100%
Page 123

Page 124

36
.  WDC HL1 SG returns.
Presentations by year and ethnicity. 
Ethnicity/ Year 2021/2022 2022/2023 2023/2024
White Scottish 1119 93% 1124 92% 993 91%
Other British 33 3% 20 2% 39 4%
Irish 5 0% 2 0% 0 0%
Other white ethnic group 10 1% 16 1% 10 1%
African, African Scottish or African British 6 0% 3 0% 8 1%
Caribbean, Caribbean Scottish or Caribbean
British 1 0% 0 0% 0 0%
Other Caribbean or Black 1 0% 0 0% 1 0%
Indian, Indian Scottish or Indian British 1 0% 1 0% 2 0%
Pakistani, Pakistani Scottish or Pakistani
British 2 0% 1 0% 4 0%
Bangladeshi, Bangladeshi Scottish or
Bangladeshi British 0 0% 1 0% 0 0%
Chinese, Chinese Scottish or Chinese British 0 0% 0 0% 0 0%
Other Asian, Asian Scottish or Asian British 5 0% 7 1% 7 1%
Mixed or multiple ethnic group 0 0% 2 0% 2 0%
Other ethnic group 12 1% 12 1% 15 1%
Not Known 1 0% 2 0% 2 0%
Refused 0 0% 0 0% 0 0%
Gypsy/ Traveller 1 0% 2 0% 0 0%
Polish 6 0% 9 1% 4 0%
Other African 0 0% 0 0% 0 0%
Black, Black Scottish or Black British 1 0% 0 0% 0 0%
Arab, Arab Scottish or Arab British 1 0% 1 0% 0 0%
White English 0 0% 13 1% 7 1%
White Roma 0 0% 1 0% 1 0%
All 1205 100% 1217 100% 1095 100%
WDC HL1 SG returns.
Presentations by year and gender. 
2021/2022 2022/2023 2023/2024
Male 621 52% 654 54% 598 55%
Female 584 48% 563 46% 497 45%
All 1205 100% 1217 100% 1095 100%
WDC HL1 SG returns.
Presentations by year, household type and gender
Household Type Sex 2023/2024
Single Person Male 527 67%
Female 259 33%
All 786 100%
Single Parent Male 30 14%
Female 178 86%
All 208 100%
Couple Male 24 45%
Female 29 55%
All 53 100%
Page 124

Page 125

37
Couple with Children Male 15 42%
Female 21 58%
All 36 100%
Other Male 1 14%
Female 6 86%
All 7 100%
Other with Children Male 1 20%
Female 4 80%
All 5 100%
.  WDC HL1 SG returns.
Our support data from 2023/24 indicates that there are higher numbers of female led
households that require low support and if accommodation is required it is temporary
furnished flats.  Where higher support is required tend to be male led households
where supported or hostel type accommodation is required.  
17% (188) of households who presented stated their reason for homelessness was
domestic abuse which is a decrease in number from 209 (17%) in 2022/23. Of the
17% of households 86% were female. 16% were ages 16 to 24 which is lower than
the previous year. In addition to this of all those who stated this reason, 40% were
female single parents, 38% were single females and 11% were single males. This is
similar to last year.
This document is also available in other languages, large print and audio
format on request.
Arabic
Page 125

Page 126

38
British Sign Language users can contact us via
contactSCOTLAND-BSL, the on-line British Sign Language interpreting service on
01389737198
Chinese (Cantonese)
Gaelic
Tha an sgrìobhainn seo cuideachd ri fhaighinn ann an cànanan eile, ann an clò mòr,
agus ann an cruth claisneachd ma thèid iarraidh
Hindi
Polish
Punjabi
Ukrainian
Цей документ також доступний іншими мовами, великим шрифтом та в
аудіоформаті за запитом.
Urdu
West Dunbartonshire Council, 16 Church Street, Dumbarton, G82 1QL
equalities@west-dunbarton.gov.uk
01389 737198
Page 126

Page 127

1
Appendix 2
Housing Solutions Strategy Consultation Summary
Person responsible: Claire Mckay
Consultation Start date - August 2024
Consultation End Date - 20/01/25
1. Title of consultation /
participation exercise
“More than a Roof” West Dunbartonshire Council
Housing Solutions Strategy 2025 - 2028
2. Aims and objectives More than a Roof” is West Dunbartonshire Council’s 6th
Homeless Strategy with a strong focus on finding housing
solutions for those households in need. This strategy covers
the period from 2025 to 2028, which means it is aligned with
our current Local Housing Strategy which also runs until
2028.
Four objectives;
1. Homelessness is prevented by providing good quality
advice and information to enable informed decisions on
personal housing solutions,
2. Where homelessness does occur households are
rehoused quickly,
3. Review and ensure there are a wide range of support
services available to prevent and end homelessness, and
4. Working with partners to provide Interim options for
temporary accommodation and providing best quality
temporary accommodation where required.
3. Invited to get
involved: (e.g. all
tenants, tenant from
the interested tenants
register, RTOs, staff)
 Lives experience – current and previous households
who have experienced homelessness
 Homeless service staff
 Keys stakeholders – HSCP, Housing, Housing
Solutions Partnership
 Public
 WDTRO and other tenants
4. Methods used to
promote/invite
stakeholders to get
involved? (e.g.
 Service user focus groups in person
 Online surveys – circulated on social media, sent via
text message and emails to staff and stakeholders
Item 10
Appendix 2
Page 127

Page 128

2
letters, posters,
website)
 Public consultation events
 Team meetings
Once it was in draft followed up at strategic meetings,
service user meetings, WDTRO meeting and a new
online survey which was circulated on social media and
emails.
5. Who took part
(Actual number of
individuals and or
number of tenant
organisations
represented)
 5 service users at initial focus group to create the
survey.
 5 services with around 100 staff
 Strategic groups with around 30 members
 WDTRO with 8 tenant representatives
 113 responses to first consultation survey
 41 responses to the draft consultation survey
6. Method(s) used to
obtain views? (e.g.
focus/working group,
newsletter, survey)
Why?
 Focus groups
 Online survey
 Public events
 Meetings internal and strategic
 newsletter
7. What good practice
or minimum
standards can you
evidence as part of
your consultation?
Ensuring variety of methods
Consultation at the beginning of the process before a draft
was written to ensure wants/needs captured first.
Further consultation once a draft was produced
8. Outcome of
consultation?
The service user focus group lead to the creation of the
online survey for the three groups;
1. Service users
2. Staff
3. Stakeholders
This consultation show that key asks more support options
including the type offered.  There was a strong ask around
more partnership working particular for those household who
have multiple support needs.  One of the big asks was more
housing and more information.
The asks from the consultation then led to the key objectives
being agreed for the draft.
From the further consultation once a draft was publish
showed that Stakeholders were very supportive of the
Page 128

Page 129

3
support element in the draft of the strategy and partnership
working.  The WDTRO were supportive of it all.
The online survey showed the strongest support for
objective one and three – prevention and support.
Where those who felt the actions weren’t enough many
mentioned actions which are already in the plan including a
youth supported options and more partnership working. 
However, it did highlight that BME group gypsy/travellers
were not specifically mentioned.  However, we have a strong
empathises on person centred approach therefore we
ensure the information and outcome is specific to them.  We
a positive ongoing engagement with West Dunbartonshire
travelling community which showed extremely high
satisfaction levels.
9. How did the
consultation influence
decision make?
It made the objectives clear as the same message was
repeated from different groups.
Helped shape specific actions of things not previously
considered.
Helped informed EIA and additional information.
10. Are you able to demonstrate this?                                                 YES          
11. How was feedback
about the
consultation and final
decision given?
Returned to speak to service users from the focus group,
and texted information, used housing newsletter and will
promote via social media.
12. Was the eight week timescale observed?                                    YES          
If no please say why?
13. Was equal opportunities information collected?                              YES          
14. Did you check with
participants that they
were happy with the
opportunities given to
make their views
known and that they
felt that they were
listened to and acted
upon?
yes
x
Page 129

Page 130

4
What worked well, what didn’t work well – or any other comments you have.
Comments:
 Need to be careful over the wording of the questions to ensure they are clear.  Think
a full strategy document is hard to ensure they are fully read providing
summaries can miss useful information.
 Starting consultation at the beginning worked so well as the objectives were
very clear plus also lead to considering actions not thought of.
 Ensuring multiple ways to participate helped gather a lot of feedback but
would consider if there are other ways that would improve more face-to-face
feedback
Summary of the first consultation
Service users
 The majority of service users said there was nothing that could have been
done to prevent their homelessness.
 Most were happy with the location of their temporary accommodation and felt it met
their needs.
 Most service users felt they are/were listened to by staff; however, some reported a
lack of empathy, feeling unheard and a lack of choice in where they live.
 More than half felt they were provided with good quality information that met their
needs; however, some reported a lack of communication with staff and feeling
uniformed about their case.
 The lack of support from homeless services was a reoccurring theme throughout,
with service users reporting that more help was required to settle into their new
tenancy in relation to benefits, employment, mental health and addiction.
 The top three things that service users need to end homelessness:
o More available housing options
o More/continuous support (financial, employment, mental health and
addiction)
o To be heard
o To feel safe
o Understanding staff.
Staff & Stakeholders
 Both largely agreed that WDC do enough to prevent homelessness, however
stated that more resources and greater partnership working were required to
improve service.
 All stakeholders believe their service has a role to play in preventing
homelessness in WD. 
 There was a shared consensus that there aren’t enough housing options available
in WD, due to a lack of affordable housing, issues with PRS affordability and
accessibility, and lack of financial support.
 Both reported a lack of available housing support options in WDC, highlighting
gaps in support for those with low support needs/at risk of homelessness, as well
as those with more complex needs.
Page 130

Page 131

5
 The lack of temporary accommodation options available in WDC was reinforced
throughout the process, with both staff and stakeholders reporting that more
specific accommodation was required to meet client need i.e. young people and
those with more complex needs.
 There was agreement that the needs of households experiencing homelessness
have changed in the last 5 years in terms of growing support needs, lack of
suitable accommodation and external pressures.
 There was a shared consensus that WDC/everyone should be doing more to help
households experiencing homelessness to be rehoused quicker through improved
collaborative working and communication, in terms of ensuring households are
tenancy ready before moving on from temporary accommodation and greater
housing options – including building more houses and bringing existing stock up to
standard.
 Most staff said they were confident in providing good quality information and advice
to households, highlighting the importance of managing expectations and regular
training to ensure they are up to date with legislative changes.
 The three priorities that stakeholders would like to see in the new strategy:
o More new housing supply
o More support (especially for young people)
o More funding
o Better communication among partners
o Multi agency working
o ‘Scaling up’ of Housing First.
Summary of Second Consultation
Alignment with Strategy objectives
 61% of respondents agreed with Objective 1: Homelessness is prevented by
providing good quality advice and information to enable informed decisions on
personal housing solutions.
 61% of respondents agreed with Objective 2: Where homelessness does
occur, households are rehoused quickly.
 78% of respondents agreed with Objective 3: Review and ensure there are a
wide range of support services available to prevent and end homelessness;
 71% of respondents agreed with Objective 4: Working with partners to provide
interim options for temporary accommodation and providing best quality
temporary accommodation when required.
Page 131

Page 132

Page 132

Page 133

Assessment No 1222 Owner cmckay                                 
Resource Regeneration, Environment and
Growth
Service Housing and Employment
FirstName Surname Job Title
Head Officer Claire Mckay Housing Development Co-
ordinator
Members Donna Kirkwood-Senior Housing Development Officer
Jennifer MacMahon - Senior Housing Development Officer
Anna Stanislavchuk - Housing Development Officer
(Please note: the word 'policy' is used as shorthand for strategy policy
function or financial decision)
Policy Title Housing Solutions Strategy
The aim, objective, purpose and intended out come of policy
It sets out the Council aims to tackle homelessness over the next three years with a
key aim being to reduce homelessness in West Dunbartonshire.  It also recognises
that when it happens we provide good quality service to those who need and are clear
what to expect.  The four objectives of the strategy are;
1. Homelessness is prevented by providing good quality advice and information to
enabled informed decisions on personal housing solutions,
2. Where homelessness does occur households are rehoused quickly,
3. Review and ensure there are a wide range of support services available to prevent
and end homelessness, and
4. Working with partners to provide Interim options for temporary accommodation and
best quality temporary accommodation where required.
Service/Partners/Stakeholders/service users involved in the development
and/or implementation of policy.
Households expericing homelessness
Staff of all WDC homeless services
Stakeholders - other social landlords, housing operations colleagues - Health and
social care partners, third sector Blue Triangle, other addiction and mental health
services
Surveys for the three groups created, along with community events and service user
forcus groups.  Attended team meetings and Stakeholders feedback via our Housing
Solutions Partnership meetings.
Does the proposals involve the procurement of any goods or services? Yes
If yes please confirm that you have contacted our procurement services to
discuss your requirements.
No
SCREENING
You must indicate if there is any relevance to the four areas
Duty to eliminate discrimination (E), advance equal opportunities (A) or
foster good relations (F)
Yes
Relevance to Human Rights (HR) Yes
Relevance to Health Impacts (H) Yes
Relevance to Social Economic Impacts (SE) Yes
Item 10
Appendix 3
Page 133

Page 134

Who will be affected by this policy?
Any resident in West Dunbartonshire Council who requires housing advice and those who require
assistance from our homeless service (housing solutions).
Who will be/has been involved in the consultation process?
-Service users current and previous
-Homeless Service Staff
o Addictions
o Mental Health
o Adult Social Care
o Criminal/Community Justice
o Housing Associations
o NHS
o Third Sector Support
o Throughcare
o WDC Housing Operations
o Woman’s Aid;
Page 134

Page 135

Please outline any particular need/barriers which equality groups may have in relation to
this policy list evidence you are using to support this and whether there is any negative
impact on particular groups.
Specific group to
consider
Needs Evidence Impact
Age                           we have an ageing
population in WDC but
that's not reflected in our
homeless presentations.
We have one  of the highest
youth
homelessness rates in the
country. The UN
Convention on the Rights of
the Child (UNCRC), is now 
incorporated in Scottish
Law. It is good practice to
consider the impact council
policies have on children
and young people.
Homeless applications age 16-
25 & % of all presentations:
2017/18 - 290 (28%)
2018/19 - 279 (27%)
2019/20 - 305 (30%)
2020/21 - 335 (32%)
2021/22 - 343 ( 28%)
2022/23 - 355 (29%)
2023/24 - 286 (26%)
Below shows the ages of those
who completed the
consultation.
16-24 6 13%
25-34 12 26%
35-_44 11 24%
45-54 6 13%
55+ 11 24%
(blank)  0%
Grand Total 46 100%
of those service users who
completed the consultation
survey.
As our strategy
recognises this group
needs more tailored
options it has a positive
impact but not at the
expense of other ages.
Disability                    The Council has a duty to
make its services 
accessible to disabled
people.
We routinely ask for medical
needs/disability as part of the
homeless assessment as we
operate a person centred
approach this ensures an
offers of assitance of housing
meets their needs.
Of the closed homeless
assessments for 2023/24 5%
said they had a disability.
Our strategy is person
centred therefore our
strategy has a positive
impact as it also
includes areas such as a
hospital discharge
protocol which could
impact those with a
disability in a ppositive
way.
Page 135

Page 136

Gender Reassign               One in four trans people (25
per cent) have experienced
homelessness at some
point in their lives. 
(Stonewall
Research)
Our updated equalities data
questions have been rolled out
to tenants and housing
applicants.
Across all WDC tenants, new
tenants and all WDC housing
applicants - 0.07% answered
yes, 17% answered no and
4% preferred not to say.
High % (80) still not answering
at all so plan to monitor
numbers and look to increase
numbers where we can record
an answer.
All staff in homeless services
completed LGBTQ+
awareness training on
delivering services.
We are also carrying out a
consultation with this specific
group with a view f creating a
housing options pathway tailor
to this groups need.
Positive
Marriage & Civil
Partnership 
Strategy takes recognition
of those in relationships, not
and any relationship
breakdowns
The group with our largest
presentations is from single
people with 72% of
applications being from a
single household.
One of are biggest reasons for
why households have
presented as homeless is
relationship breakdown with
21% in 2023/24 presented as a
result of a relationship
breakdown.
We also have a bespoke
housing options pathway for
those fleeing domestic violence
which aim is to reduce the
trauma experienced.
Positive
Pregnancy &
Maternity        
Cross cuts with sex, with
additional considerations
Unsuitable accommodation
has always covered women
who were pregnant.
However, there is a focus from
the scottish government to
reduce the numbers of children
in temporary accommodation. 
Positive as its not at the
expense of another
group
Page 136

Page 137

Race                          BME groups being more
likely to be victims of racial
discrimination. Services
need to be accessible to
users of other languages.
2023/24 stats show 87% of
those who answered the
question are White Scottish but
also shows 1% Polish, 0.7%
other Asian and 1% other 
ethnic not on the list.
Due to wider asylum dispersal
decisions there is a bigger
various in the race of those
presenting.  However, we
delivered a person centred
service and therefore
acknowledge different needs a
requirements. 
We use language line as
standard to ensure no
language barriers and also
ensure all our information is
available in different
languages.
From our last round of
consultation feedback 
received highlighting a concern
that Gypsy/Travellers  groups
and accommodation were not
specifically mentioned. 
However, as stated we provide
a person centre approach
therefore if we had someone
from the travelling community
present and did not want
traditional accommodation his
would be taken account of. 
Along side this the permanent
travelling site is full and as we
have a strong working
relationship with the travelling
community further discussions
are taking place about
additional sites however, this
would not sit within this
strategy.    Our satisfaction
from this community in general
are exceptional high compared
to our peers.
positive
Religion and Belief           
Race and religion are not
identical but these can
cross cut in cases of
discrimination or
harassment. 
Race and religion are not
identical but these can
cross cut in cases of
discrimination or
harassment.
The overarching theme
throughout our strategy is that
the service we provide is
person centred therefore all
personal information and
circumstances are taken into
account.
As Equality data is not
compulsory we have a lower
response with 51% do not
respond to this.
positive
Page 137

Page 138

Sex                           Male and females have
potential different
experiences of
homelessness.
We collate gender details
routinely as part of our
assessments. 
We have also completed a
gendered analysis as part of
our RRTP, which has been
updated for 24/25.
Of those who presented
in 2023/24, 45% were female
(either single person or head of
household). Which is a 1%
decrease from 22/23. For
those who presented as a
result of domestic abuse 86%
were female. An increase of
2%.
In general more women have
had a Prevent 1 case opened
over the years than men. In
19/20, women accounted for
53% of the 243 Prevent 1
approaches. In 20/21, this was
59% of 375 approaches. 21/22
increased again to 61% of
647 cases . 22/23 was 61% of
447 cases and 23/24, 58% of
380.
We have strong policies and
process around domestic
abuse approaches.   ALthough
this is gender neutral, women
are still the highest proportion
of those who report domestic
violence.  We also have strong
working relationships with
Violence Against Women
Partnership.
Additional domestic abuse
rights for women are to be
introduced within the new
Housing Bill. We will therefore
review our domestic abuse
protocol in line with the new
legislation.
Of those who replied to online
consultation;
Female_ 25 54%
Male_ 19 41%
Non_Binary_ 1 2%
Prefer_not_to_say_ 1 2%
(blank)  0%
Grand Total 46 100%
positive
Page 138

Page 139

Sexual Orientation  Research by University of
Surrey noted; Nearly 50%
of LGBTQ+ people living in
social housing
accommodation do not feel
a sense of belonging in their
local community and over a
quarter report feeling lonely
in the area they live.
Young LGBTQ+ are at risk
of homelessness but there
is
often a undisclosed reason
for being homeless.
We have updated our
equalities data to better
capture those who use our
service to better inform our
policies.
To help reduce any barriers, all
front facing homeless service
staff complete LQBTQ+
external training.
We will also have surveyed
LGBTQ+ community to
highlight any barries they face
accessing housing.  This
information will then be used to
created a person centre
housing pathway to help
reduce barrier and provide a
positive outcome.
positive
Human Rights                  Article 8, (private life etc) of
the EHCR is especially
relevant in this area.
UNCRC considerations
should be made, in this
context Provision and
Protection are most
significant
Housing is a basic human
right, the aim of strategy to
provide permanent housing
as quickly as possible and in
the right place is ensuring this
right is met as soon as
possible.
Human rights considerations
for individuals, families and
Children and young people
cross cut within the scope of
this policy.
positive
Health                      The links between health
and housing are endless. 
Homelessness/poor
housing 
have a significant impact on
health and lack of it
negatively impacts
individuals and families.
Housing people as quickly as
possible into settled
accommodation will also have
a positive impact.
The strategy looks to
stengthen partnership working
with colleagues in health and
social care with updated
hospital discharge, addictions
and mental health protocols
which will also help with
improved health.
The strategy also covers
support where health is a key
area for all support services.
positive.
Page 139

Page 140

Social & Economic
Impact     
WDC has some of the most
deprived areas according to
SIMD.
Those on a lower income
have reduced housing
options
and can live in poorer
housing.
Affordability is key within
housing the strategy and in
particular prevention actions
include addressing affordability
incuding a prevention fund to
stop court action for social
tenants.
The service provides a whole
system approach allowing
more housing options to be
affordable with our "Help to
Rent" scheme to access
private rented accommodation,
along with fully utilising DHP to
cover rent shortfalls or issues
with under 35 LHA rates.
temporray accommodation
standards help ensure porerty
same as mainstream which
helps things like fuel costs as
all meet SHQS
positive
Cross Cutting          This strategy  cuts across
age, disability, health and
social and economic
impacts. This EIA also
highlights that more
information is required
around sexual orientation,
gender reassignment, race
and religion.
Many of the protocols and
actions are cross cutting
against many characteristics.
Communication with services
users should be informed by
the Councils 'Communicating
Effectively' guidance
positive.
Page 140

Page 141

Actions
Page 141

Page 142

Policy has a negative impact on an equality group,but is still to be implemented, please
provide justification for this.
Will the impact of the policy be monitored and reported on an ongoing bases?
The policy will be monitor annually and update a EIA as a minimum or as any further individual policies are
created or amended.
Q7 What is you recommendation for this policy?
Intoduce
Please provide a meaningful summary of how you have reached the recommendation
EIA 1148: Having fully considered all characteristics, there are no negative impacts to any
groups, only positive to young people, single households, pregnant women, religious,
Gypsy/Travellers acknowledging different needs for different groups and not a one size fits all.
Page 142

Page 143

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer, Housing and Employability
Housing and Communities Committee: 26 February 2025
__________________________________________________________________
Subject: More Homes West Dunbartonshire – West Dunbartonshire Council
Affordable Housing Supply Delivery Programme
1. Purpose
1.1      This purpose of this report is to provide the Housing and Communities
Committee an update on progress with West Dunbartonshire’s More Homes
Programme which oversees the delivery of the Council’s new home building
programme.
2. Recommendations
2.1 It is recommended that the Housing and Communities Committee:
(i) Notes the content of the report and the progress made to date in the
delivery of the Council’s More Homes West Dunbartonshire approach,
including the first handovers of new homes at the zero carbon Clydebank
East development which represents the 500th new build the Council has
developed under the current More Homes programme; and
(ii) Notes the remedial actions being undertaken by Council Officers in
response to Connect Modular entering into administration as the Gilmour
Avenue housing development contractor
3. Background
3.1 In West Dunbartonshire the Affordable Housing Supply Programme (AHSP) is
delivered through a More Homes West Dunbartonshire strategic approach
which has successfully delivered over one thousand new affordable homes in
West Dunbartonshire to date and includes the Council’s own ambitious New
House Building Programme.
3.2 The Council’s last full practical completion took place at the Queens Quay
development in September 2022 delivering twenty-nine new Council homes in
a key regeneration area as part of a wider development which has delivered
146 new social rented homes.  The homes were the first residential properties
to be heated from the Council’s Queens Quay District Heating Network. This
development was recognised at national housing sector awards winning the
following: -
 Best Residential Regeneration Project – Herald Property Awards
 Inside Housing Best Residential Development (Scotland)
Item 11
Page 143

Page 144

3.3 These 29 new homes, are in addition to the completion of the Council’s first
fully dementia designed development at Creveul Court, Alexandria and other
exemplar developments in Haldane, Aitkenbar, Bellmsyre, Dumbarton
Harbour and St Andrews, Clydebank.  The Council have now completed
twelve new build developments since 2013 and are the largest developer of
social homes in West Dunbartonshire delivering 508 new homes and 137
acquisitions through our buyback scheme to date as outlined in Table 1
below.  The 500th new build home in the More Homes West Dunbartonshire
delivery programme was delivered in October 2024 at our current Clydebank
East development which will fully complete in April 2025:
Table 1:  Completed Council New Build and Acquisitions
Project No. of
Units
Completion
Date
Granville Street (Phase 1), Clydebank 24 July 2013
Miller Road, Alexandria 15 October 2013
Granville Street (Phase 2), Clydebank 9 February 2014
Central Bellsmyre, Dumbarton 36 December 2014
Hillstreet Square, Dumbarton 37 August 2015
Second Avenue, Clydebank 40 April 2018
Creveul Court, Alexandria 22 April 2021
Aitkenbar Primary School 55 July2021
Haldane Primary School 58 August 2021
St Andrews, Clydebank 126 October 2021
Dumbarton Harbour, Dumbarton 45 December 2021
Queens Quay, Site B, Clydebank 29 August 2022
Clydebank East, Clydebank 46 Ongoing
Buyback Acquisitions 158 Ongoing
Totals 700
3.4     The Strategic Housing Investment Plan (SHIP) 2025-2030, outlining West   
Dunbartonshire’s Affordable Housing Supply Programme through the More
Homes West Dunbartonshire approach was approved by the Housing and
Communities Committee in November 2024. The SHIP outline plans to
contribute to meet the Council Administration’s aim of delivering 2500 new
affordable and social rented homes over the 10-year period 2022-2032.
4. Main Issues
More Homes West Dunbartonshire - Delivery Programme
4.1 Building new affordable homes has an important role to play in revitalising
local economies and assisting with post-pandemic and economic recovery
plans, negating the impacts of the current cost of living crisis and combatting
poverty principally child and fuel poverty.  It is also clear that the need for
affordable homes has and will increase in the current ongoing economic
environment.
4.2 The Council’s More Homes West Dunbartonshire approach is an ambitious
plan that aims to continue the positive momentum of the delivery of much
Page 144

Page 145

needed Council homes in West Dunbartonshire and will significantly assist the
Council’s aim to deliver 2500 new social and affordable homes by 2032.
4.3 As the biggest affordable housing developer in West Dunbartonshire, the
Council has identified several future development sites for new council homes
to address existing and new housing need. The design of these homes will
further develop, improve, and exceed current best practice, providing
sustainable homes using innovative technology and delivering on our low
carbon ambitions including passivhaus and other net zero carbon
opportunities.
4.4 The Council’s More Homes West Dunbartonshire approach has evidenced
strong support from council tenants and was recently highlighted as one of the
two key future spending priority areas for tenants through the comprehensive
tenant satisfaction survey undertaken in late 2024. 
4.5 The Strategic Housing Investment Plan and HRA Capital Plan outlined the
plans the Council have for meeting their new build ambitions.  An update on
each development site is provide below: -
Clydebank East:
This development will deliver eighty-eight new homes and has been designed
to meet the housing need within the wider West Dunbartonshire area. The
table below shows the housing mix:
House Type Sustainability Standard Number of New
Homes
Wheelchair Bungalow
3bed/4person
Net Zero 3
House 3bed/5person Net Zero 15
House 4 bed/7person Net Zero 12
House 5 bed/8 person Net Zero 8
Wheelchair Cottage Flat
1bed/2 person
Net Zero 4
Cottage Flat 2 bed/4 person Net Zero 4
Flat 1 bed/2person Net Zero 16
Flat 2 bed/4 person Net Zero 24
Wheelchair Flat 1 bed/2person Net Zero 2
Works commenced on this development in January 2023. The first 12 units
were handed over on 7th October 2024. Sectional handovers of the 3-, 4- and
5-bedroom houses have now been completed (46 units). The handover of the
flatted accommodation will begin at the end of February. Practical completion
and handover of all 88 new homes is currently estimated for the 11th April
2025.
All homes are designed to the Housing for Various Needs Standard (HfVN).
There will be nine fully Wheelchair (WCH) accessible properties. The 4- and 5
-bedroom homes have ground floor double bedrooms. 
Page 145

Page 146

The development at Clydebank East sees the completion of a major housing
led regeneration of a key priority regeneration area identified in the Local
Housing Strategy and will be the first fully zero carbon housing development
in West Dunbartonshire and marks a significant milestone in our transition to
net zero new homes approved at the August 2022 meeting of the Housing
and Communities Committee. 
We have previously reported award of above benchmark grant due to the
complexities of the development at Clydebank East this resulted in a total
grant award of £12.6m, this equates to over £143k grant per home and
around £4.68m more than the benchmark grant award this ensured the
delivery of the development without any negative impact on the wider Housing
Revenue Account.
Pappert, Bonhill
This development element of this development commenced in early March
2025, delivering the housing mix as follows: -
House Type Sustainability Standard Number of New
Homes
House 3bed/5 person Passivhaus 6
House 3bed/5 person Net Zero 6
House 4bed/6person Net Zero 4
House 4bed/7person Net Zero 1
Flat 2bed/3person w/c Net Zero 3
Flat 1 bed/2person Net Zero 6
The development is currently meeting all delivery targets and will be
completed in Summer 2025.
Mount Pleasant, Old Kilpatrick
The site started on 15th April 2024 and construction will last approximately one
year.
This is a 19-unit complex which is designed for elderly residents and will
deliver high quality amenity housing, the housing mix is outlined below for
information.
House Type Sustainability Standard Number of New
Homes
Bungalow 1bed/2person Net Zero 3
Flat 1bed/2person w/c Net Zero 4
Flat 1bed/2person Net Zero 4
Flat 2bed/4person Net Zero 8
Willox Park, Doveholm, Dumbarton
Page 146

Page 147

The development of seventeen new homes for the elderly at a former care
home site will comprise of the housing mix below.
House Type Sustainability Standard Number of New
Homes
Flat 2bed/3person Net Zero 2
Flat 1 bed/2person Net Zero 15
This development has now been granted planning permission and a
contractor, McTaggart Construction, has been appointed to begin the
construction phase. Construction will commence in November on this project.
The net zero heat strategy will be delivered by ground source heat pump, as it
was felt that this solution to be preferable than an air source heat pump for
each home. 
Current tenants at Willox Park have been consulted throughout the design
process and this has continued with the contractor holding Q&A sessions. 
We are currently working with the existing tenants to ensure they have an up-
to-date housing application live to make sure the process of moving into the
new facility is as easy and streamlined as possible.
Bonhill Gap Site Strategy
House Size Sustainability Standard Number of New
Homes
1bed wheelchair Net Zero 4
1 bed general needs Net Zero 16
2 bed wheelchair Net Zero 3
3 bed general needs Net Zero 3
4 bed general needs Net Zero 2
5 bed general needs Net Zero 4
7 bed general needs Net Zero 2
Planning has been submitted for all sites with approval granted for Campbell
St and forthcoming for Braehead and O’Hare development sites.
A contractor has been appointed to deliver the Campbell St and Braehead
development sites. The tender cost was returned over £2m below the
estimated cost of the job illustrating a competitive tender result. As illustrated
in the table above the developments feature large family homes.
The tender for O’Hare is due back 14th February 2025.
Bank Street, Alexandria
The development will consist of twenty-two sheltered/amenity housing units in
partnership with the HSCP. Planning has been submitted.
Page 147

Page 148

House Type Sustainability Standard Number of New
Homes
Flat 1bed/2person w/c Net Zero 22
Communal Room Net Zero 1
Staff Office Net Zero 1
A planning decision was expected at the end of November. However there
has been a delay in planning consent.
The contract for this project has been awarded. This tender return has
returned a competitive price around £2m below the estimated delivery costs.
Similar to Willox Park, tenants at Gray Street have been consulted throughout
the design process and will be assisted to make the transition as smooth as
possible.
Clydebank Health Centre
Demolitions of the former health centre building was completed in late 2024.
Having received the feasibility report for the site, the Council plans to develop
20+ units of sheltered housing to reprovision existing sheltered housing
currently provided at Young Street, therefore strategically improving the
provision of sheltered accommodation within Clydebank. We also aim to build
around 10-15 units of mostly family housing.
The Council have discussed proposals with tenants at Young Street on the
proposition of developing a new sheltered complex on the old Clydebank
Health Centre site. This was met with a largely positive reaction and
consultation with tenants, staff and other stakeholders will continue
throughout the design process.
A multidisciplinary design team, led by Collective Architecture, who carried out
the feasibility study, have been appointed through the Scottish Procurement
Alliance framework to carry forward the above-mentioned site proposal
designs. They have begun the pre-application for Planning process along with
relevant consultation exercises. 
Gilmour Avenue, Hardgate
As part of the wider development of our Clydebank Gap Site strategy, the
Council identified a Housing Revenue Account site in the Hardgate area at
Gilmour Avenue.  The site was previously the location of timber garages on
concrete bases.  These have long since been demolished and the site has
been beset with fly tipping issues for several years.
The development started on site on 23/9/2024 and had a completion date of
14/2/25.  However, on the 3rd January 2025, Connect Modular, the main
contractor unfortunately entered administration. The Council is now working
towards the appointment of a new contractor with minimal delay to completion
Page 148

Page 149

and are aiming to complete the homes this financial year.  The homes have
been delivered on site and are over 80% completed. The Council has secured
the site and taken over the site security contract.
Dennystoun Forge Gypsy/Traveller Site
The project has been scored and assessed as a priority in the new SHIP 2025
-2030, with a proposed site start in 2026/27.  Our in-house design team and
Procurement colleagues are proceeding to detail our plans.
Engagement continuous with the Dennystoun Forge community. Our focus
remains on decant options, where we are engaging with our Assets and
Planning colleagues on the possible use of an identified alternative site for
decanting during the works, and on procurement, where we have consulted
with other local authorities with experience of similar projects.   The decant
arrangements have thrown up a series of questions which we will be
discussing with the community.  While the costs for the decant site are likely
to be high, overall, we expect a saving to be achieved through giving the
eventual works contractor free access to the Dennystoun Forge site.
Queen Mary Avenue, Clydebank (Clydebank Gap Sites)
House Type Sustainability Standard Number of New
Homes
1 bed/2 person  Cottage Flat Net Zero 10
2 bed/3 person WCH Cottage Flat Net Zero 1
3 bed/4 person Cottage Flat Net Zero 1
3 bedroom terraced house Net Zero 3
4 bedroom semi-detached Net Zero 2
The transfer of the site at Queen Mary Avenue, Clydebank with vacant
possession at the cost of £140,000 from the Council’s General Fund to the
Housing Revenue Account for the delivery of new Council homes was
approved at the February meeting of the Housing and Communities
Committee and has now been concluded.
A main contractor has been appointed for the delivery of the proposed 17 new
homes. The Council has started the pre-application planning process and are
hopeful to submit for planning at the end of February. Community consultation
has been scheduled prior to the Planning submission.
Silverton Regeneration
The demolition for the 2 identified sites in Smollett Road and Dumbuie
Avenue has now been completed. We are currently engaging with our
colleagues in consultancy services around the design for the housing on the
site. 
Queens Quay, Site C, Clydebank
Page 149

Page 150

The Council has been developing a design to deliver a projected twenty units
on this site to complement the housing mix within sites A and B.  This
development will also be designed to meet low/zero carbon principles and
linked to the Queens Quay district heating network.
.
Pre-planning response was received on the 25 February highlighting concern
of the WDC development proceeding in isolation. We have adopted a
proactive response to this issue and have developed masterplan diagrams
incorporating the surrounding sites and have conducted valuations on the
adjacent site to Queens Quay C with a view to purchasing additional land to
deliver more affordable housing in the Queens Quay regeneration site. If this
is achieved, we would seek to develop a mixed tenure approach to any
expanded development site delivering one hundred new affordable homes.
We are seeking discussion with CRL (Clydeside Regeneration Limited) to
progress the possibility of acquiring this additional land and will be able to
draw down Scottish Government grant to enable this. However, because of
the uncertainties surrounding potential delivery timescales for this project and
the reduced funding it is no longer allocated funding within the current
Strategic Housing Investment Programme.
Buyback Programme
Total number of properties purchased in 2024/25 financial year 28
Total Purchase Value                         £2,635,000
The twenty-eight acquisitions include fourteen larger family properties
comprising of three bedrooms or more. The strategic approach to acquire
homes that are aligned to housing need and the increased home valuations in
West Dunbartonshire have required that we amend our target for 2024/25
from sixty acquisitions to forty through the buyback scheme. However,
additional buyback acquisitions will be delivered through the National
Acquisition Scheme, Ukrainian Long Term Resettlement Fund and local
housing association schemes which will ensure the Strategic Housing
Investment Plan target of sixty acquisitions is achieved.
4.6    The Housing Development Team are continuously looking for opportunities to
provide additional new build council homes and will bring any potential site to
the Housing and Communities Committee with as much information as
possible as part of the regular More Homes update paper.
5. People Implications
5.1 The delivery of the More Homes delivery programme is managed through
existing resource within the Housing Development & Homelessness team
funded from the Housing Capital Investment Programme. 
6. Financial and Procurement Implications
Page 150

Page 151

Financial
6.1 On 6 March 2024 Council approved the Housing Capital Programme 2023-
2028 which saw significant resources committed to the delivery of new council
homes in West Dunbartonshire.  An expenditure budget of £155m for the
affordable housing supply programme is factored into the HRA Capital
Programme this will be updated to reflect the income and expenditure
highlighted within this report.  As it currently stands, it is anticipated that this
programme will complete on project life budget.
6.2 Housing and Finance Officers will continue to assess the ongoing affordability
of future developments within the context of the Housing Revenue Account
Business Plan.
6.3 The Council has to date delivered 542 new homes for social rent, these
additional homes bring council tax revenue of around £670k per year to West
Dunbartonshire Council.
Procurement
6.4 All new development sites will be subject to new detailed procurement
strategies and the opportunities highlighted within 4.5 of this report will
continue to be prioritised. Where the contract award is less than £213,000,
authority is delegated to the Chief Officer in consultation with the Procurement
Manager to instruct the award of contracts for the planned revenue and
capital spend detailed in this report to suppliers providing the most
economically advantageous offer to the Council.
6.5 All procurement activity conducted by the Council more than £2m is
subject to a contract strategy. The contract strategy for new housing
development within the HRA Capital Programme will be developed by the
Corporate Procurement Unit in consultation with Housing Development
Officers. The contract strategy will include, but is not limited to; contract
scope, service forward plan, the market, procurement model and routes –
including existing delivery vehicles, roles and responsibilities, risks, issues
and opportunities and on-going contract management. Opportunities to
maximise the positive social, economic, and environmental impact for the
Council through the relevant procurement processes will be developed in line
with procurement policy.
7. Risk Analysis
7.1 All Council new build projects have their own Risk Register which highlights
the risk within and out-with the project team’s control.  These are maintained
and adjusted on an on-going basis.
7.2 With any new build project there is a risk that as the projects develop the cost
increases beyond the estimated contract cost.  Any additional borrowing
requirements, or conversely, cost savings will be reported to future meetings
Page 151

Page 152

of the Housing and Communities Committee. However, this is mitigated
through a target cost model approach in our current contract arrangements
within the Scottish Procurement Alliance (SPA) framework and Scotland
Excel.
8 Environmental Sustainability
8.1 The delivery of new homes is within the approved More Homes zero carbon
approach. Our current and future approach to strategic housing asset
management will continue to prioritise a ‘zero carbon’ approach to decision
making and deliverability and this will be done the aims of the Housing Asset
Management Strategy and the Council’s Climate Change Strategy.
9. Equalities Impact Assessment (EIA)
9.1 The proposal does not alter any existing policy or pattern of service delivery
and so is not considered to require an equalities impact assessment.
10. Consultation
10.1 As part of a rent consultation exercise, 92% of respondents indicated their
support for the Council’s ambitious plans to deliver the Housing Revenue
Account (HRA) new council house build programme. In addition, there was
positive support for the wider delivery of new build housing as part of the
recent Local Housing Strategy.  Regular updates on new build development
are provided to the West Dunbartonshire Tenants and Residents Organisation
at the bi-monthly liaison meetings.
11. Strategic Assessment
11.1 The Local Housing Strategy is the overarching document setting out the
strategic direction for housing across all tenures and informs the future
investment in housing and related services across West Dunbartonshire.
11.2 Having considered all the Council’s strategic priorities, this report, and the
provision of new supply social housing for rent contributes greatly to all the
Council’s strategic priorities.
Peter Barry
Chief Officer, Housing and Employability
Date: 13 February 2025
Person to Contact: John Kerr – Housing Development and Homelessness
Manager, Housing Development and Homelessness
Team, Housing and Employability, telephone:
07793717981, email: john.kerr@west-dunbarton.gov.uk
Page 152

Page 153

Mikayla Deeley, Senior Housing Development Officer,
Housing Development and Homelessness Team,
Housing and Employability: email mikayla.deeley@west-
dunbarton.gov.uk
Appendices: None
Background Papers: West Dunbartonshire Council’s Local Housing Strategy
Local Housing Strategy, Health Inequalities Impact
Assessment
Wards Affected: All
Page 153

Page 154

Page 154

Page 155

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer – Resources 
Housing & Communities Committee  – 26 February 2025
___________________________________________________________________ 
Subject:  Housing Revenue Account (HRA) Capital   
Budgetary Control Report to 31 October 24 (Period 7) 
1. Purpose 
1.1 This report provides an update on the HRA capital programme to 31 October 
2024. 
2. Recommendations 
2.1 Members are asked to: 
i) Note the current position of the 2024/2025 HRA capital budget and the
HRA capital plan. 
ii) Note that in year financial performance is monitored against a
2024/2025 capital expenditure budget of £73.664m and a 2024/2025
capital income budget of £10.003m, a one-year borrowing requirement
of £63.661m. 
iii) Note that project life performance is monitored against a five-year
project life expenditure budget of £319.738m and a project life income
budget of £54.577m, a five-year borrowing requirement of £265.161m. 
iv) Note that there are eighteen projects reporting off track with an
anticipated over / under spend against their 2024/2025 budgets, with a
forecast net underspend of £2.918m in 2024/2025. 
v) Note that all projects are currently on track to achieve their planned
completion dates and to deliver within their respective five-year project
life budgets.    
3. Background 
3.1 On 6 March 2024 the Council approved the updated Housing Revenue
Account Capital Plan for 2024/2025 to 2028/2029. 
3.2  Since then budget adjustments have taken place to bring forward in year 
project under/over spends during 2023/2024, to reflect up to date information
on progress delivering the plan and any need for budget acceleration and
budget deceleration from / to future years, and to update the expenditure and
income budgets for Affordable Housing Supply projects to reflect the
2023/2024 outturn and to reflect that the most recent cost and income
forecasts  The budget adjustments result in revised capital budgets as set out
in Exhibit 1.   
Item 12
Page 155

Page 156

Exhibit 1: Revised HRA Capital Budget 2024/2025 – 20278/2029 
2024/25
BCR07 
(£m)
Project
Life
BCR07 
(£m) 
Project Life
March 24 
(£m)
Other Capital Expenditure  7.165 27.129  27.180
Major Component Replacement   19.795 92.604  92.604
Void Capital  4.902 19.212  20.712
Structural & Environmental   2.767 14.175  14.175
Support Costs  2.761 14.367  14.367
Affordable Housing Supply
Programme 
36.274 152.251  149.053
Total Expenditure  73.664 319.738  318.091
Total Income   10.003 54.577  47.029
Prudential Borrowing  63.661 265.161            271.062 
4. Main Issues 
4.1 Progress against the 2024/25 capital plan is detailed in: 
Appendix 1 – HRA Capital Summary BCR07 
Appendix 2 – HRA Capital Detail BCR07 
4.2  The HRA capital summary report at Appendix 1 reports that planned
expenditure and planned income are both in line with the overall project
budgets. Appendix 1 reports that there are twenty-eight capital projects where
expenditure / income budget is tracked over the multi-year life of the project
and twenty-nine projects classified as rolling programme projects /
contingency / fees, that is programmes of work where an annual budget is set
each year that takes account of demand, cost, and affordability. 
4.3  Appendix 2 shows all projects with approved in year and project life budgets
as well as forecast expenditure / income. The appendix highlights a
2024/2025 expenditure budget of £73.664m and a forecast spend of
£70.486m, an underspend of £3.178m (4.3% of the 2024/2025 budget) The
2024/2025 capital income budget is £10.003m, with a forecast income of
£9.743m. 
Page 156

Page 157

4.4 Commentary on the 2024/2025 expenditure variances are set out in Exhibit 2
below. 
Exhibit 2: Project Over / Underspends 2024/2025 
Project 
2024/2025
BCR07 
Forecast 
(£m) 
2024/2025
BCR07
Budget
(£m) 
2024/2025
Variance 
(£m)
Commentary
1 Special Need
Adaptations 
0.506 0.655 (0.149) • Reduced throughput
of capital
adaptations this
year 
• Inhouse adaptations
team is fully up to
date with its order
books.
• Improved
performance with
average time of 46
days. 
• Underspend will be
available for
reprofiling in future
years. 
2 Capitalised
Minor Works
4.116 3.000 1.116 • Transfer of Electrical
Installation
Condition Works
`spend to minor
works budget.
• Overspend will be
re-profiled over
future years. 
• Officers are
increasingly
directing minor
works requests to
the relevant planned
capital programme. 
3 Environmental
Sensors
1.620 2.000 (0.380) • Excellent progress
with this programme
with an anticipated
2,000 sensors due
to be installed this
year. 
• Underspend reflects
the mobilization
Page 157

Page 158

Project 
2024/2025
BCR07 
Forecast 
(£m) 
2024/2025
BCR07
Budget
(£m) 
2024/2025
Variance 
(£m)
Commentary
period and
challenges in getting
access to
properties. 
• Underspend will be
available for
reprofiling in future
years. 
4 Roofing Works  2.201 2.500 (0.299) • Underspend reflects
the changing mix of
the capital
programme with an
increased number of
mixed tenure blocks
that require owner
consent before work
can start. This
necessary process
delay project start 
• Underspend will be
available for
reprofiling in future
years. 
5 Void House
Works 
5.438 4.902 0.536 • Transfer of
increased void
spend to HRA
capital account
following a review.
• Void delivery costs,
including overtime
on voids and
contractor spend,
have reduced as
void number have
reduced.
• Overspend will be
re-profiled over
future years. 
6 Environmental
Works
0.992 1.068 (0.076) • Reduced throughput
of environmental
works this year
because operatives
have also worked
across other HRA
service areas.
Page 158

Page 159

Project 
2024/2025
BCR07 
Forecast 
(£m) 
2024/2025
BCR07
Budget
(£m) 
2024/2025
Variance 
(£m)
Commentary
• Underspend will be
available for
reprofiling in future
years. 
7 Contingency 0.000 0.100 (0.100) • Contingency
released to offset
cost pressures
across the HRA
capital account. 
8 Clydebank East  9.896 9.700 0.196 • Good progress with
development and is
ahead of previous
projection
• 32 homes handed
over to date 
9 Pappert 
Expenditure 
7.446 9.653 (2.207) • Development now
on site and cash
flow accurately
based on agreed
programme of works
and this is reflected
in the projection 
• No impact on overall
project budget or
timescales and
development on
track 
Pappert 
Income 
(2.803) (3.303) 0.500 • Affordable Housing
Supply Programme
grant funding
reprofiled 
10 Queen Mary
Avenue 
0.010 0.120 (0.110) • Affordable Housing
Supply Programme
grant funding
reprofiled 
Page 159

Page 160

Project 
2024/2025
BCR07 
Forecast 
(£m) 
2024/2025
BCR07
Budget
(£m) 
2024/2025
Variance 
(£m)
Commentary
11 Queens Quay
Site C
Expenditure 
0.000 1.000 (1.000) • Underspend reflects
delays progressing
this project within a
financial viability
assessment 
Queens Quay
Site C
Income 
0.000 (1.000) 1.000 • The acquisition
grant funding
because of the
project not been
taken forward 
12 Dennystoun
Forge
0.060 0.250 -0.190 • Revised projection
based on
development project
plan 
13 Future New
Build & Related
Regeneration
Projects /
Professional
Fees 
0.500 1.015 -0.515 • Ongoing review of
the programme
allowed non
committed funds to
be released to offset
cost pressures
across the HRA
capital account. 
Future New
Build & Related
Regeneration
Projects 
Income 
(0.200) 0.000 (0.200) • Ongoing review of
the programme
allowed non
committed funds to
be released to offset
cost pressures
across the HRA
capital account. 
14 Buyback Grant
Income
(2.417) (2.858) 0.441 • Revised projection
based on the
distribution of
Scottish
Government
acquisition funding 
15 7 – 9 Gilmour
Avenue 
Income 
(0.215) (0.195) (0.020) • Revised projection
based on the
application of the
Strategic Local
Programme
Page 160

Page 161

Project 
2024/2025
BCR07 
Forecast 
(£m) 
2024/2025
BCR07
Budget
(£m) 
2024/2025
Variance 
(£m)
Commentary
16 Bank Street 
Income 
(0.518) 0.000 (0.518) • Revised projection
based on the
application of the
Strategic Local
Programme 
17 Bonhill Gap
Sites 
Income 
(0.514) 0.000 (0.514) • Revised projection
based on the
application of the
Strategic Local
Programme 
18 Silverton 
Income
(0.429) 0.000 (0.429) • Revised projection
based on the
application of the
Strategic Local
Programme 
(2.918) 
4.5 Budget assumptions are required to forecast costs / income, especially where
projects span multi-year and project finances have yet to be finalised. It is
therefore likely that the projected year end budgetary position will change
during the year. 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected in-year financial position for capital budgets. 
Page 161

Page 162

8. Risk Analysis 
8.1 The main risks are as follows: 
(a) The reported variances should be viewed in the knowledge that there
are several variable factors which could arise between now and 31
March which could affect the year end results for capital budgets. 
(b) Because of current market conditions, inflation is at an all-time high and
interest rates continue to be volatile. To forecast for the full year costs
budget assumptions have been required. These assumptions continue to
change regularly and therefore it is likely the projected year end
budgetary position will change from that reported. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
11. Consultation 
11.1 All services involved in delivering the capital budgets have been consulted
during the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
________________
Laurence Slavin
Chief Officer – Resources
Date: 26 February 2025 
Person to Contact: Jim McCarron 
Business Partner, Finance 07772 322055  
E-mail: james.mccarron@west-dunbarton.gov.uk 
Appendices: Appendix 1 -  HRA Capital Summary BCR07 
Appendix 2-  HRA Capital Details BCR07 
Background Papers: 
Housing Revenue Account (HRA) Capital Investment Programme, Revenue
Budget, and Rent Levels for 2024/25 - Council 6 March 2024. 
Wards Affected           All Wards 
Page 162

Page 163

Period 7 - 31 October 24
Item 12
Appendix 1
Summary
HRA Capital Expenditure Project Life
Budget
Project Life
Forecast Spend
Project Life
Variance
Rolling
Programmes
Projects Projects
On Track / Complete
Projects
Off Track
£000 £000 £000
Other Capital Expenditure 27,129                27,129                -                       5                    3                    2                                  1                                 
Major Component Replacement 92,604                92,604                -                       10                  1                    1                                  -                              
Void Capital 19,212                19,212                -                       1                    -                -                               -                              
Structural & Environmental 14,175                14,175                -                       3                    1                    1                                  -                              
Support Costs 14,367                14,367                -                       1                    -                -                               -                              
Affordable Housing Supply Programme 152,253              152,253              -                       5                    12                  7                                  5                                 
Total Expenditure 319,740              319,740              -                       25                  17                  11                                6                                 
Total Income (54,576) (54,576) -                       3                    12                  6                                  6                                 
Total 265,164 265,164              -                      
Page 163

Page 164

Page 164

Page 165

All Approved HRA Capital Projects at Period 7  _  31 October 24
Project Category Planned
End Date
Revised
End Date
Project Life
Budget
Expenditure
to 31 /3/24
Expenditure
to Date
Projected
Future Spend
Project Life
Forecast Spend
Project
Variance
Approved
Budget
2024/25
Expenditure
to Date
2024/25
Projected
Spend
2024/25
In Year
Variance
2024/25
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
OCE1 Special Needs Adaptations Rolling 31/03/2025 3,408                    -                             316                        3,092                    3,408                    -                             655                        316                        506                        (149)
OCE2 Capitalised Minor Works Rolling 31/03/2025 10,945                  -                             1,868                    9,077                    10,945                  -                             3,000                    1,868                    4,116                    1,116                   
OCE3 Better Homes Priority Budget Rolling 31/03/2025 1,680                    -                             726                        954                        1,680                    -                             705                        726                        705                        -                            
OCE4 Environmental Sensors Programme Project 31/03/2029 10,000                  103                        949                        9,051                    10,000                  -                             2,000                    846                        1,620                    (380)
OCE5 Housing CCTV Installation Programme Project 31/03/2025 750                        -                             -                             750                        750                        -                             750                        -                             750                        -                            
OCE6 QL Development Rolling 31/03/2025 109                        -                             9                            100                        109                        -                             21                          9                            21                          -                            
OCE7 Gypsy Travellers Site Rolling 31/03/2025 141                        -                             -                             141                        141                        -                             34                          -                             34                          -                            
OCE8 Airport Noise Project 31/03/2026 96                          -                             -                             96                          96                          -                             -                             -                             -                             -                            
Other Capital Expenditure 27,129                  103                        3,868                    23,261                  27,129                  -                        7,165                    3,765                    7,752                    587                       
MCR1 Targeted SHQS /EESSH compliance works Rolling 31/03/2025 32,632                  -                             3,357                    29,275                  32,632                                             -   6,537                    3,357                    6,537                    -                       
MCR2 External Component Renewal - Roofs Rolling 31/03/2025 13,010                  -                             1,027                    11,983                  13,010                                             -   2,500                    1,027                    2,201                    (299)
MCR3 Doors/Windows Component Renewals Rolling 31/03/2025 14,599                  -                             3,014                    11,585                  14,599                                             -   5,011                    3,014                    5,011                    -                       
MCR4 District Heating Project 31/03/2030 6,400                    -                             -                             6,400                    6,400                                               -   -                             -                             -                             -                       
MCR5 External Stores / Garages / Bin Stores Rolling 31/03/2025 245                        -                             -                             245                        245                                                   -   47                          -                             47                          -                       
MCR6 Secure entry component renewals Rolling 31/03/2025 245                        -                             7                            238                        245                                                   -   47                          7                            47                          -                       
MCR7 Statutory / Regulatory Compliance Works Rolling 31/03/2025 976                        -                             3                            973                        976                                                   -   294                        3                            294                        -                       
MCR8 Heating Improvement Works Rolling 31/03/2025 8,800                    -                             1,168                    7,632                    8,800                                               -   1,900                    1,168                    1,900                    -                       
MCR9 Energy Improvements / Energy Efficiency Works Rolling 31/03/2025 295                        -                             -                             295                        295                                                   -   57                          -                             57                          -                       
MCR10 Kitchen Upgrade Rolling 31/03/2025 12,102                  -                             1,954                    10,148                  12,102                                             -   2,652                    1,954                    2,652                    -                       
MCR11 Bathroom & Shower Replacement Rolling 31/03/2025 3,300                    -                             494                        2,806                    3,300                                               -   750                        494                        750                        -                       
Major Component Replacement 92,604                  -                        11,024                  81,580                  92,604                  -                        19,795                  11,024                  19,496                  299-                       
VOC1 Void House Strategy Programme Rolling 31/03/2025 19,212                  -                             3,440                    15,772                  19,212                                             -   4,902                    3,440                    5,438                    536                       
Void Capital 19,212                  -                        3,440                    15,772                  19,212                  -                        4,902                    3,440                    5,438                    536                       
STE1 Defective structures/component renewals Rolling 31/03/2025 2,210                                                 - 415                        1,795                    2,210                                                 - 712                        415                        712                        -                       
STE2 Environmental Renewal - Paths & Environment Rolling 31/03/2025 5,559                                                 - 311                        5,248                    5,559                                                 - 1,068                    311                        992                        (76)
STE3 Asbestos Management Works Rolling 31/03/2025 1,235                                                 - 47                          1,188                    1,235                                                 - 237                        47                          237                        -                       
STE4 Multi Storey Flat Strategy Project 31/03/2029 5,171                    65                          70                          5,101                    5,171                                                 - 750                        5                            750                        -                       
Structural & Environmental 14,175                  65                          843                        13,332                  14,175                  -                        2,767                    778                        2,691                    (76)
SUP1 Salaries / Central Support / Overhead Rolling 31/03/2025 14,367                  -                             1,611                    12,756                                     14,367                            -   2,761                    1,611                    2,761                    -                       
Support Costs 14,367                  -                        1,611                    12,756                  14,367                  -                        2,761                    1,611                    2,761                    -                            
AHP1 Buy Backs Rolling 31/03/2025 20,522                  -                             1,988                    18,534                                     20,522                            -   4,670                    1,988                    4,670                    -                            
AHP2 Demolition Programme Rolling 31/03/2025 485                        -                             215                        270                                                485                            -   485                        215                        485                        -                            
AHP3 Contingency Rolling 31/03/2025 520                        -                             -                             520                                                520                            -   100                        -                             -                             (100)
AHP4 Clydebank East Project 15/04/2025 32,894                  22,334                  30,722                  2,172                                       32,894                            -   9,700                    8,388                    9,896                    196                       
AHP5 Pappert Project 22/05/2025 10,517                  601                        4,051                    6,466                                       10,517                            -   9,653                    3,450                    7,446                    (2,207)
AHP6 Mount Pleasant Project 31/03/2025 6,005                    555                        2,560                    3,445                                         6,005                            -   4,396                    2,005                    4,396                    -                            
AHP7 7-9 Gilmour Avenue Project 10/10/2024 574                        40                          281                        293                                                574                            -   534                        241                        534                        -                            
AHP8 Willox Park Phase1 Project 01/10/2025 5,143                    401                        491                        4,652                                         5,143                            -   2,500                    90                          2,500                    -                            
AHP9 Bank Street Project 01/01/2026 7,549                    231                        287                        7,262                                         7,549                            -   518                        56                          518                        -                            
AHP10 Bonhill Gap Sites Project 01/03/2026 11,537                  99                          220                        11,317                                     11,537                            -   514                        121                        514                        -                            
AHP11 Clydebank Health Centre Project 30/09/2026 10,595                  705                        895                        9,700                                       10,595                            -   390                        190                        390                        -                            
AHP12 Silverton Project 01/12/2026 2,537                    33                          35                          2,502                                         2,537                            -   429                        2                            429                        -                            
AHP13 Queen Mary Avenue Project 01/12/2026 4,556                    32                          37                          4,519                                         4,556                            -   120                        5                            10                          (110)
AHP14 Queens Quay Site C Project 01/04/2029 8,231                    31                          31                          8,200                                         8,231                            -   1,000                    -                             -                             (1,000)
AHP15 Dennystoun Forge – New Build Project 01/04/2026 4,000                    -                             58                          3,942                                         4,000                            -   250                        58                          60                          (190)
AHP16 Future New Build & Related Regeneration Projects Rolling 31/03/2025 24,515                  -                             -                             24,515                                     24,515                            -   515                        -                             300                        (215)
AHP17 Fees, Staffing Costs, contingency Rolling 31/03/2025 2,073                    -                             30                          2,043                                         2,073                            -   500                        30                          200                        (300)
Affordable Housing Supply Programme 152,253                25,062                  41,901                  110,352                152,253                -                        36,274                  16,839                  32,348                  (3,926)
Total Expenditure 319,740                25,230                  62,687                  257,053                319,740                -                        73,664                  37,457                  70,486                  (3,178)
Full Project Life In Year
Item 12
Appendix 2
Page 165

Page 166

All Approved HRA Capital Projects at Period 7  _  31 October 24
Project Category Planned
End Date
Revised
End Date
Project Life
Budget
Income
to 31 /3/24
Income
to Date
Projected
Future Income
Project Life
Forecast Income
Project
Variance
Approved
Budget
2024/25
Income
to Date
2024/25
Projected
Income
2024/25
In Year
Variance
2024/25
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
CAPI1 Scottish Govt Buyback Grant Rolling 31/03/2025 (9,451) -                             (748) (8,703) (9,451) -                             (2,858) (748) (2,417) 441
CAPI2 Clydebank East Project 15/04/2025 (12,605) (12,605) (12,605) -                             (12,605) -                             -                             -                             -                             -                            
CAPi3 Pappert Site Project 22/05/2025 (3,725) (172) (2,975) (750) (3,725) -                             (3,303) (2,803) (2,803) 500
CAPI4 Mount Pleasant Project 31/03/2025 (1,838) (467) (1,837) (1) (1,838) -                             (1,371) (1,370) (1,371) -                            
CAPI5 7-9 Gilmour Avenue Project 10/10/2024 (195) -                             -                             (195) (195) -                             (195) -                             (215) (20)
CAPI6 Willox Park Phase1 Project 01/10/2025 (1,489) (414) (489) (1,000) (1,489) -                             (1,075) (75) (1,075) -                            
CAPI7 Bank Street Project 01/01/2026 (2,108) (258) (258) (1,850) (2,108) -                             -                             -                             (518) (518)
CAPI8 Bonhill Gap Sites Project 01/03/2026 (4,789) (188) (377) (4,412) (4,789) -                             -                             (189) (514) (514)
CAPI9 Clydebank Health Centre Project 30/09/2026 (3,785) (585) (585) (3,200) (3,785) -                             (200) -                             (200) -                            
CAPI10 Silverton Project 01/12/2026 (1,000) -                             -                             (1,000) (1,000) -                             -                             -                             (429) (429)
CAPI11 Queen Mary Avenue Project 01/12/2026 (1,600) (140) (140) (1,460) (1,600) -                             -                             -                             -                             -                            
CAPI12 Queens Quay Site C Project 01/04/2029 (3,086) (2,086) (2,086) (1,000) (3,086) -                             (1,000) -                             -                             1,000
CAPI13 Dennystoun Forge – New Build Project 01/04/2026 (2,000) -                             -                             (2,000) (2,000) -                             -                             -                             -                             -                            
CAPI14 Future new build sites & related regeneration projects Rolling 31/03/2025 (6,900) -                             -                             (6,900) (6,900) -                             0 -                             (200) (200)
CAPI15 HRA Loan Repayments Rolling 31/03/2025 (5) -                             1-                            (4) (5) -                             (1) (1) (1) -                            
Total Income (54,576) (16,915) (22,101) (32,475) (54,576) -                             (10,003) (5,186) (9,743) 260                       
Prudential Borrowing Requirement 265,164                8,315                    40,586                  224,578                265,164                -                             63,661                  32,271                  60,743                  (2,918)
Full Project Life In Year
Page 166

Page 167

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer – Resources 
Housing and Communities Committee – 26 February 2025
___________________________________________________________________ 
Subject:  Housing Revenue Account Budgetary Control Report 
to 31 October 24 (Period 07) 
1. Purpose 
1.1 The purpose of this report is to advise Committee of the 2024/2025 HRA
revenue budget position on 31 October 2024 and the forecast position of the
HRA reserves as of 31 March 2025. 
2.  Recommendations 
2.1 Members are asked to: 
i. note the HRA revenue account is forecasting an adverse variance of
£1.317m. If required, the adverse variance will be offset by using HRA
reserves of £0.968m and a General Fund reserve contribution of £0.349m. 
ii. note the HRA would be expected to develop a repayment plan to replenish
the HRA reserves to meet the prudential target and reimburse the General
Fund for any contribution made towards the HRA deficit. 
iii. note that work will continue to identify efficiencies across all areas of the
HRA revenue account budget to minimise the adverse variance. 
3. Background 
Revenue 
3.1 The Council approved a £53.218m HRA revenue budget for 2024/2025 on the
6 of March 2024 
4. Main Issues 
Revenue 
4.1 This report advises committee of the key issues contributing to the Housing
Revenue Account (HRA) forecasting a 2024/25 deficit of £1.317m, with the
deficit reducing to £0.349m through using all existing HRA reserves. This
leaves the HRA in a vulnerable financial position with no capacity to absorb
any unforeseen future costs unless the reserves are rebuilt. 
4.2  The Housing (Scotland) Act 1987 specifies that if a HRA deficit arises in any
one year, the local authority must make a General Fund contribution to make
good the deficit. In this event, the HRA would be expected to repay that
contribution from any future HRA surpluses. 
Item 13
Page 167

Page 168

4.3 On 25 October 2023, a Financial Update report taken to full Council advised
that, after discussions between the Council and the West Dunbartonshire
Tenants and Residents Organisation (WDTRO), a commitment was made to
the WDTRO that the Housing Maintenance Trading Organisation (HMTO)
surplus, used to support the General Services budget, would be phased out
over a three-year basis at a projected £0.290m per annum. The HMTO is
currently forecast to return a £0.594m surplus to the General Fund in 2024/25.
2025/26 is the final year of the three-year phasing out period. This strategy
was formally agreed as part of agreeing the Council general services budget
in March 2024 which incorporated the general services cost pressure reported
in October 2023. 
4.4  This arrangement was implemented at a time when the financial health of the
HRA was robust with sufficient reserves to absorb unforeseen costs at a
reasonable scale. As referenced at paragraph 4.1 this is no longer the case
due to the scale of the unforeseen financial challenges the HRA is facing. The
provision of a surplus to the General Fund whilst the HRA is in deficit will
exacerbate the financial pressure on the HRA and make it more challenging to
rebuild the HRA reserves to comply with the agreed prudential target of 2% of
expenditure (which equates to £1.162m based on the draft estimates for the
2025/26 budget).   
4.5 The Housing Senior Management Team are working to identify efficiencies
across all areas of the HRA revenue account budget to minimise the in-year
deficit. The team have identified a range of measures that reduce the in-year
HRA deficit by £0.857m, as detailed in Exhibit 1 and paragraph 4.6. 
Exhibit 1 – Movement in HRA Forecast BCR05 to BCR07 
Subjective Summary Forecast
BCR07 
2024/25
Forecast
BCR05
2024/25
Movement  RAG
Status 
£000 £000 £000
Employee Costs 7,377 7,283 94 ¤
Property Costs 2,600 2,600 0 ¢
Transport Costs 158 158 0 ¢
Supplies & Services  439 411 28 ¤
Support Services 2,633 2,785 (152) £
Other Expenditure  626 560 66 ¤
Repairs & Maintenance 12,564 13,393 (829) £
Bad Debt Provision 1,002 879 123 ¤
Void Loss / Council Tax 1,095 1,282 (187) £
Loan Charges 26,041 26,041 0 ¢
Total Expenditure 54,535 55,392 (857) £     
Total Income (53,218) (53,218) 0 ¢     
Net Expenditure 1,317 2,174 (857) £ 
Page 168

Page 169

4.6 The key contributing factors (favourable and adverse) to the forecast HRA
expenditure reduction are detailed in Exhibit 2. 
Exhibit 2 – Key Factors to Expenditure Reduction 
Subjective
Summary
Movement  Key Factors
£000
Employee Costs 94 Officers had targeted a £200k saving
through controls over overtime and
recruitment. The expected saving is
forecast to be closer to £100k. 
Supplies,
Services and
Admin
28 Additional ICT software costs to the HRA
for services to improve service automation
and modernisation. These costs were not
included in the previous forecast.  
Support Services  (152) Saving identified following a review of HRA   
Central Support Services recharges. The
forecast recharge has been reduced to
take account of reduced employer pension
contributions.  
Other
Expenditure 
66 Additional rent abatement cost and
ongoing support to Women’s Aid
organisations in respect of tenancy
sustainment.  
Repairs &
Maintenance
(829) Additional savings identified include:  
o £450,000 reduction on repair spend
through the identification of additional
works that qualifies for capitalisation.
o £50,000 reduction in Grounds
Maintenance spend through agreed
revised work specifications.
o £130,000 reduction in planned
maintenance spend through revised
work specifications.
o £200,000 of rechargeable repair
income forecast through strict
application of policy of recharging
tenants where works are caused by
tenant abuse or neglect.  
Bad Debt
Provision
123 Additional provision for the non-collection
of HRA debt. HRA debt has been
increasing due to strict application of the
rechargeable repairs policy. These types
of debt are difficult to recover and so it is
prudent to make an increase in the
provision for the non-recovery of a
proportion of this debt. 
Page 169

Page 170

Subjective
Summary
Movement  Key Factors
£000
Void Loss
(Council Tax /
Lost Rents)
(187) Officers identified additional properties that
qualify for Council Tax exemption and will
receive 100% relief. There is also a
£30,000 reduction in the forecast void
rental income loss. 
Total  (857) 
HRA Variance Report on Variances > £50,000 
Adverse Variances 
Loan Charges - £3.949m Adverse (BCR05 - £3.949m Adverse) 
4.7 The main pressure on the HRA revenue account is elevated borrowing costs
leading to higher interest and expense payments on new borrowing and debt
refinancing. When the Council went to rent consultation in the last quarter of
2023 and drafted the 2024/2025 HRA budget, a HRA loan charge budget of
£22.092m was set with the assumption that council borrowing costs would fall
during 2024/2025. Unfortunately, local authority borrowing costs have
remained elevated and exceed the rates used when setting the HRA budget.
HRA outstanding debt on 31 March 2024 was £301m, with the HRA debt
expected to increase to £356m on 31 March 2025. Interest and expense
payments are forecast to be £3.531m more than the 2024/2025 budget. 
4.8 A further pressure on the HRA loan charge budget is higher than planned debt
repayments. The HRA repays capital borrowing over the expected economic
life of the asset invested in. (E.g. heating systems – 20 years, new build
properties – 60 years). The HRA debt repayment period has decreased
(leading to higher annual debt repayment) as the Council has recently
reprofiled capital expenditure on housing stock to improve the condition of the
asset to allow a quicker turnaround of void properties – more information is
provided at paragraph 4.14. Debt repayments are forecast to be £0.418m
more than the 2024/2025 budget. 
Other Expenditure - £0.296m Adverse (BCR05 - £0.230m Adverse) 
4.9 The key adverse variance is a forecast rent abatement overspend of £0.200m.
Demand is exceeding the new reduced abatement budget. There has been
considerable progress in reducing this area of spend with the 2024/2025 rent
abatement spend forecast to be more than £0.150m less than the 2023/2024
spend. 
4.10   A further variance is a forecast spend of £0.084m to Women’s Aid. The HRA
budget 2024/2025 removed payments to Women’s Aid, however through
discussions with the Women’s Aid organisations officers have agreed to retain
the spend in 2024/25. 
Page 170

Page 171

Favourable Variances 
4.11 The HRA cost pressures detailed present unprecedented financial challenges
for the Housing Revenue Account. As reported at 4.5 above, officers have
been reviewing HRA spend on an ongoing basis and have identified further
net revenue savings of £0.857m that add to previously reported favourable
variances against the 2024/2025 HRA budget. 
Employee Costs - £0.284m Favourable (BCR05 - £0.378m Favourable) 
4.12 The HRA employee cost budget is £7.661m. The spend against this budget is
influenced by staff turnover, staff overtime spend and the success in recruiting
to posts as they become vacant. Management continues to target staffing
efficiencies to deliver a significant underspend against budget in 2024/2025,
including tighter controls on staff recruitment and overtime together with a
review of the HRA staff recharge to the HRA capital account and the General
Fund account. 
Support Services - £0.152m Favourable (BCR05 - £0.003m Favourable Variance) 
4.13 The HRA central support charge budget is £2.788m. A review of the HRA
central support recharge identified a saving of £0.150m because the previous
HRA forecast had not taken account of reduced employer pension contribution
costs. 
Repair & Maintenance – £2.644m Favourable (BCR05 - £1.816m Favourable
Variance) 
4.14 The HRA repair and maintenance budget is £15.208m. This budget primarily
funds reactive repairs, void repairs, planned maintenance, compliance works,
and environmental works. 
4.15 Officers continuously review spend to identify larger value works that qualify
for capitalisation (for works which extend the lifespan of assets). A review of
work conducted in void properties to bring properties back to relet standard
assessed that a considerable proportion of works extend the lifespan of assets
and should be appropriately charged to the HRA capital account. Furthermore,
the completion of an Electrical Installation Condition Report (EICR) is
complementary to the environmental sensor installation programme and is
also being financed through the capital account. 
4.16 There have been discussions with Greenspace colleagues and the
Greenspace service will deliver a £0.150m saving by revising work
specifications and streamlining processes. 
5. People Implications 
5.1 There are no people implications. 
Page 171

Page 172

6. Financial and Procurement Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report. 
7. Risk Analysis 
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year. This can
affect all service areas. 
8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 All services involved in delivering the HRA revenue budget have been
consulted during the compilation of this report. 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.    
Laurence Slavin
Chief Officer – Resources
Date: 26 February 2025
___________________________________________________________________ 
Person to Contact:  Jim McCarron - Business Unit Finance Partner 
Telephone: 07772 322055   
e-mail james.mccarron@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Budgetary Position (Revenue)    
Appendix 2 - Variance analysis (Revenue)
Background Papers: None 
Wards Affected:  All 
Page 172

Page 173

WEST DUNBARTONSHIRE COUNCIL
Item 13
Appendix 1
HRA REVENUE BUDGETARY CONTROL 2024/25
PERIOD END DATE
Budget
2024/25
Spend to Date
2024/25
Forecast Spend
2024/25 Annual RAG Status
£000 £000 £000 £000 %
Employee Costs 7,661 4,320 7,377 (284) -4% 
Property Costs 2,600 1,517 2,600 0 0% 
Transport Costs 148 92 158 10 0% 
Supplies, Services And Admin 406 256 439 33 8% 
Support Services 2,788 1,536 2,633 (155) -6% 
Other Expenditure 330 367 626 296 90% 
Repairs & Maintenance 15,208 6,937 12,564 (2,644) -17% 
Bad Debt Provision 876 585 1,002 126 14% 
Void Loss (Council Tax / Lost Rents) 1,109 823 1,095 (14) -1% 
Loan Charges 22,092 15,191 26,041 3,949 18% 
Total Expenditure 53,218 31,624 54,535 1,317 2% 
House Rents (51,049) (29,779) (51,049) 0 0% 
Lockup Rents (215) (125) (215) 0 0% 
Factoring/Insurance Charges (1,555) (907) (1,555) 0 0% 
Other rents (130) (76) (130) 0 0% 
Interest on Revenue Balance (146) (85) (146) 0 0% 
Miscellaneous income (123) (72) (123) 0 0% 
Transfer from Reserves 0 0 0 0 0% 
Total Income (53,218) (31,044) (53,218) 0 0% 
Net Expenditure 0 580 1,317 1,317 
31 October 2024
Subjective Summary Forecast Variance
2024/25
Page 173

Page 174

Page 174

Page 175

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 October 2024
PERIOD 7
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Employee Costs 7,661 7,377 (284) -4% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Support Services 2,788 2,633 (155) -6% 
Main Issues An underspend is anticipated
because the budgeted recharge
of £2.788m was overstated
because it not  account for
reduced employer pension
contributions across services. Mitigating Action
Anticipated Outcome
Variance Analysis
Forecast Variance
2024/25
Subjective Description
Subjective Analysis RAG
Status
Cost of employees charged directly to the HRA.
Variance Narrative
An employee cost underspend is anticipated as management target staffing efficiencies,
including tighter controls on staff recruitment and overtime.
None required.
A year end underspend.
Variance Analysis
Subjective Analysis
None required.
A year end underspend.
Forecast Variance
2024/25
RAG
Status
Subjective Description
Recharge of Central Supports costs ( e.g. Finance, Legal, HR. ICT ) to the HRA
Variance Narrative
Item 13
Appendix 2
Page 175

Page 176

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 October 2024
PERIOD 7
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Other Expenditure 330 626 296 90% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Repairs & Maintenance 15,208 12,564 (2,644) -17% 
Main Issues
Mitigating Action
Anticipated Outcome
Variance Analysis
A rent abatement overspend of £200k is forecast because demand is exceeding the new
reduced abatement budget. It is worth noting that the 2024/2025 rent abatement spend is
forecast to be £150,000 less than the 2023/2024 spend.
A year end overspend.
Forecast Variance
2024/25
Subjective Description
Rent abatements, support for young tenants, legal and banking expenses, and other sundry costs.
Variance Narrative
Subjective Analysis RAG
Status
Housing Operations and Building Service will continue to place the strictest controls over the
abatement process to minimise this spend.
Subjective Description
Responsive and planned repair and maintenance services to houses and lockups and income recovered from tenant rechargeable and
owner occupier repairs.
Variance Narrative
A high  volume of repair orders and ongoing inflationary pressures are driving up costs, with the
most significant pressures across responsive repair and void repair budgets.
A year end underspend
Officers have reviewed the repairs spend and identified a potential saving against the
2024/2025 repair and maintenance budget by transferring spend charged to revenue to the
capital programme. A review of specific workstreams identified revenue funded works that
extend the lifespan of the assets. Specifically work carried out in void properties to bring these
back to relet standard are significant and include component renewals.
Furthermore, the completion of an Electrical Installation Condition Report (EICR) is
complementary to the environmental sensor installation programme. 
Variance Analysis
Subjective Analysis Forecast Variance
2024/25
RAG
Status
Page 176

Page 177

WEST DUNBARTONSHIRE COUNCIL
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 October 2024
PERIOD 7
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Bad Debt Provision 876 1,002 126 14% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Loan Charges 22,092 26,041 3,949 18% 
Main Issues
Mitigating Action
Anticipated Outcome A year end overspend.
Variance Analysis
Forecast Variance
2024/25
Variance Narrative
Subjective Analysis RAG
Status
Variance Analysis
Subjective Analysis Forecast Variance
2024/25
RAG
Status
The Council will continue to actively manage its external / internal borrowing to ensure that
borrowing costs are minimised
Subjective Description
Loans Fund repayments and the  payment of interest and expenses on outstanding HRA debt.
Local authority borrowing costs for medium / long term Public Works Loan Board (PWLB) debt
and for short term debt have remained  high. The higher interest rates are driving up HRA debt
financing costs. The HRA budget assumed that borrowing rates would reduce in 2024/2025.
Whilst the Bank of England base rates reduced by 0.25% in early November,  2024/2025
borrowing rates will be higher than budgeted.
Variance Narrative
The Council needs to make prudent provision for the non collection of HRA debt. HRA debt
has been increasing as officers more stringently apply the rechargeable repairs policy for
repairs caused by tenant neglect / abuse. These debts are difficult to collect because tenants
often have multiple other debts with the Council and others.
Housing and Corporate Debt Recovery staff continue to work closely to maximise contact with
customers in arrears and to put in place reasonable affordable repayment plans that take
account of customers personal circumstances.
A year end overspend.
Subjective Description
Provision for uncollected rent across range of HRA debts, including rent arrears, rechargeable repairs, factoring repairs.
Page 177

Page 178

Page 178

Page 179

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Resources   
Housing and Communities Committee - 26 February 2025
___________________________________________________________________ 
Subject:  General Fund Housing and Communities Financial Report 2024/25
as at Period 7 (31 October 2024) 
1. Purpose 
1.1 The purpose of the report is to provide the Committee with an update on the
financial performance to 31 October 2024 (Period 7) of General Fund
Revenue services under the remit of the Housing and Communities
Committee. 
2.  Recommendations 
2.1    Members are asked to: 
i) note the contents of this report which shows the revenue budget forecast
to underspend against budget by £0.029m (0.9 %) at the year-end. 
ii) note the progress on efficiencies incorporated into budgets for 2024/25. 
3. Background 
3.1 Revenue Budget 
Members agreed the revenue estimates for 2024/25 at the meeting of West
Dunbartonshire Council on 01 March 2024,   
A total net budget of £3.813m was approved for services under the remit for
Housing and Communities services. 
The budget has been reduced to reflect the decrease in Strathclyde pension
fund contributions. This budget has been vired to a central reserve to be used
to balance the budget over the next four years as agreed at the Council
meeting on 6 March 2024. 
Budget adjustments are shown below: - 
Service £m
Agreed budget 6 March 2024  3.813
Additional Funding:  
Additional Rapid Rehousing Transition
Programme funding  Homeless 0.010
Base Budget Adjustment:  
Remove excess superannuation budget  All (0.469)
Revised budget as at Period 6  3.354
Item 14
Page 179

Page 180

4 Main Issues 
Revenue Budget 
4.1 Appendix 1 shows the probable outturn for the services at £3.606m. As the
revised annual budget is £3.354m there is a projected overspend on budget of
£0.306m. £0.423m of the overspend relates to approved additional spend
financed by specific reserves. The underlying variance is therefore a positive
variance of £0.117m. Details of the reserves applied in 2024/25 are below. 
Reserve  Service £m   
Cost Of Living: -  
Additional investment to the energy fund to
cover winter. 
W4U 0.149
Transitional Funding Support to Y-Sort-It
over 4 years. £39,000 per year for 4 years. 
W4U 0.039
Cost of Living 3: Additional Support for
Apprenticeships. £50,000 per year for 4
years. 
W4U  0.050
Total Cost of Living Reserve Used  0.238   
Earmarked reserves: - 
CCTV Network Upgrade  ASB 0.021 
Modern Apprentice 23/24 underspend  W4U 0.126
Delay in Communities restructure Communities  0.038
Total Earmarked Reserves used   0.185   
Total Reserves Used   0.423 
Appendix 2 provides a detailed analysis by service area. 
Appendix 3 provides commentary of projected net annual variances greater
than £0.050m. 
Appendix 4 shows progress on the delivering 2024/2025 saving options.   
Page 180

Page 181

5. People Implications 
5.1 There are no people implications. 
6. Financial Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. 
6.2 Agreed efficiencies for 2024/2025 are monitored with current indications being 
that £0.184m of the budgeted savings of £0.222m will be achieved (see
Appendix 4). As noted in 4.2 above, the smoothing fund will be used to offset
this £0.038m shortfall. 
7. Risk Analysis 
7.1 The present variances should be viewed in the knowledge that there are a
number of variable factors which could arise between now and 31 March and
which could affect the year end results for both the revenue and capital
budgets.    
7.2 Assumptions around service demand and timing of nationally agreed changes
through the phasing out of lockdown change regularly and therefore there is a
significant risk that the projected year end budgetary position will change from
that reported.   
8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 All services involved in delivering the budgets have been consulted in the
compilation of this report 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities. 
Page 181

Page 182

Laurence Slavin
Chief Officer, Resources                       
Date: 26 February 2025
___________________________________________________________________ 
Person to Contact:  Jim McCarron  - Business Unit Finance Partner, 
16 Church Street, Dumbarton, G82 1QL, 
Telephone: 07772 322055  
e-mail james.mccarron@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Summary Budgetary Position (Revenue)    
Appendix 2 - Detailed Budgetary Position (Revenue)    
Appendix 3 - Variance Analysis (Revenue)
Appendix 4 - Monitoring of Efficiencies/Savings Options
(Revenue)     
Background Papers: None 
Wards Affected:  All 
Page 182

Page 183

WEST DUNBARTONSHIRE COUNCIL
Item 14
Appendix 1
REVENUE BUDGETARY CONTROL 2024/25
HOUSING & COMMUNITIES SUMMARY
MONTH END DATE 31 October 2024
Actual
Outturn
2023/24
Total Budget
2024/25
YTD
Spend
2024/25
Forecast
Spend
2024/25
Annual
RAG
Status
Net Variance
attributable to
earmarked
reserves
spend
Underlying
Variance
excluding
earmarked
reserves
spend
£000 £000 £000 £000 £000 % £000 £000
2,583 1,966 1,606 2,308 342 17%  364 (22)
0 Shared Prosperity Fund (0) 662 0 0 0%  0 0
951 950 591 901 (49) -5%  38 (87)
828 639 1,024 633 (6) -1%  0 (6)
15 15 9 15 0 0%  0 0
0 Private Sector Housing Grant 41 22 40 (1) -2%  0 (1)
291 332 188 357 25 8%  21 4
(569) (589) (497) (594) (5) -1%  0 (5)
4,099 3,354 3,606 3,660 306 9%  423 (117)
Private Sector Housing
Anti Social Behaviour & CCTV
Housing Maintenance Trading A/c
Total Net Expenditure
Working 4 U
Service / Subjective Summary
Annual
Variance
2024/25
Communities
Homeless Persons
Page 183

Page 184

Page 184

Page 185

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2024/25
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 October 2024
PERIOD 7
Actual
Outturn
2023/24
Service Summary
Total
Budget
2024/25
YTD
Spend
2024/25
Forecast
Spend
2024/25
RAG Status
£000 £000 £000 £000 £000 %
20,172 Employee 18,914 10,277 18,129 (785) 3% 
2,496 Property 2,668 1,342 2,694 26 -65% 
1,320 Transport and Plant 1,221 699 1,207 (14) 22% 
6,335 Supplies, Services and Admin 5,925 3,470 5,970 45 25% 
3,437 Payments to Other Bodies 3,009 1,633 3,250 241 19% 
998 Other 884 706 1,108 224 9% 
34,759             Gross Expenditure 32,621 18,126 32,358 (262) -1% 
(30,660) Income (29,267) (15,183) (28,698) 56957% -91% 
4,099               Net Expenditure 3,353 2,944 3,660 308 9% 
£000 £000  £000  £000  £000 %
2,718 Employee 2,476 1,337 2,495 19 1% 
0 Property 0 0 0 0 0% 
15 Transport and Plant 18 5 13 (5) -27% 
79 Supplies, Services and Admin 92 8 92 0 0% 
1,898 Payments to Other Bodies               1,484 903 1,813 329 22% 
29 Other 0 144 144 144 0% 
4,739               Gross Expenditure 4,069          2,397          4,557           488 12% 
(2,156) Income (2,104) (791) (2,249) (145) -7% 
2,583               Net Expenditure 1,966          1,606          2,308           343 17% 
£000 £000  £000  £000  £000 %
638 Employee 691 320 669 (22) -3% 
3 Property 0 0 0 0 0% 
1 Transport and Plant 0 1 2 2 0% 
22 Supplies, Services and Admin 0 9 6 6 0% 
342 Payments to Other Bodies               2,233 333 2,244 10 0% 
0 Other 0 0 0 0 0% 
1,006               Gross Expenditure 2,925          663             2,921           (4) 0% 
(1,006) Income (2,925) (1) (2,921) 4 0% 
-                   Net Expenditure 0-                 662             -               0 0% 
£000 £000  £000  £000  £000 %
888 Employee 663 424 675 13 2% 
0 Property 17 0 0 (17) -98% 
7 Transport and Plant 5 3 7 3 65% 
98 Supplies, Services and Admin 103 51 105 2 2% 
166 Payments to Other Bodies 233 139 237 4 2% 
0 Other 0 0 0 0 0% 
1,160               Gross Expenditure 1,020          617             1,025           5 0% 
(209) Income (71) (26) (124) (53) -76% 
951                  Net Expenditure 950             591             901              (49) -5% 
£000 £000 £000 £000 £000 %
2,887 Employee 2,812 1,512 2,831 19 1% 
2,181 Property 2,165 1,153 2,174 9 0% 
25 Transport and Plant 25 11 21 (4) -16% 
146 Supplies, Services and Admin 76 67 93 17 22% 
1,010 Payments to Other Bodies 958 392 859 (99) -10% 
0 Other 0 0 0 0 0% 
6,249               Gross Expenditure 6,036 3,135 5,978 (58) -1% 
(5,421) Income (5,397) (2,111) (5,345) 52 1% 
828                  Net Expenditure 639 1,024 633 (6) -1% 
All Services
Working 4 U
Annual
Variance
2024/25
Shared Prosperity Fund
Communities
Homeless Persons
Item 14
Appendix 2
Page 185

Page 186

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2024/25
HOUSING AND COMMUNITIES COMMITTEE DETAIL
YEAR END DATE 31 October 2024
PERIOD 7
Actual
Outturn
2023/24
Service Summary
Total
Budget
2024/25
YTD
Spend
2024/25
Forecast
Spend
2024/25
RAG Status
Annual
Variance
2024/25
£000 £000 £000 £000 £000 %
0 Employee 0 0 0 0 0% 
0 Property 0 0 0 0 0% 
0 Transport and Plant 0 0 0 0 0% 
1 Supplies, Services and Admin 0 0 0 0 0% 
14 Payments to Other Bodies 15 9 15 0 0% 
0 Other 0 0 0 0 0% 
15                    Gross Expenditure 15               9                 15                0 0% 
0 Income 0 0 0 0 0% 
15                    Net Expenditure 15               9                 15                0 0% 
£000 £000 £000 £000 £000 %
44 Employee 41 24 41 0 0% 
121 Property 241 25 241 0 0% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 0 (2) (2) (2) 0% 
247 Payments to Other Bodies 205 120 206 1 0% 
0 Other 0 0 0 0 0% 
412                  Gross Expenditure 487 167 486 (1) 0% 
(412) Income (446) (145) (446) 0 0% 
0 Net Expenditure 41 22 40 (1) -2% 
£000 £000 £000 £000 £000 %
278 Employee 281 153 298 17 6% 
78 Property 86 63 107 21 24% 
0 Transport and Plant 0 0 0 0 0% 
0 Supplies, Services and Admin 0 0 1 1 0% 
102 Payments to Other Bodies 114 70 120 6 5% 
0 Other 0 0 0 0 0% 
458                  Gross Expenditure 481 286 526 45 9% 
(167) Income (149) (98) (169) (20) -13% 
291                  Net Expenditure 332 188 357 25 8% 
………………………………………………………………………………………………………………………………………………………………………………………….
£000 £000 £000 £000 £000 %
13,357 Employee 12,642 6,828 11,789 (853) -7% 
116 Property 159 101 172 13 8% 
1,273 Transport and Plant 1,173 679 1,165 (8) -1% 
6,011 Supplies, Services and Admin 5,654 3,345 5,681 27 0% 
0 Payments to Other Bodies 0 0 0 0 0% 
969 Other 884 562 964 80 9% 
21,726             Gross Expenditure 20,512        11,515        19,771         (741) -4% 
(22,295) Income (21,101) (12,012) (20,365) 736 3% 
(569) Net Expenditure (589) (497) (594) (5) 1% 
Private Sector Housing
Housing Maintenance Trading A/c
Private Sector Housing Grant
Anti Social Behaviour & CCTV
Page 186

Page 187

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Forecast
Spend RAG Status
£000 £000 £000 %
Working 4 U 1,966 2,308 342 0.174 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Communities 950 901 (49) -5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Maintenance Trading A/c (589) (594) (5) 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome The service will achieve its budgeted surplus
None available
Employee costs showing a positive variance due to vacant posts within the service. The
forecast overspend in supplies and services reflects building material inflationary pressures.
Income recovery is slightly less then budget due to the service undertaking less work than
originally anticipated.
This service delivers maintenance and investment services to the council's housing stock
Budget Details
Variance Analysis
Variance
This is the provision of Working 4u service.
None Required.
Net expenditure will be in line with budget.
31 October 2024
The adverse variances on payments to other bodies/ other expenditure reflects spend that will
met by use of earmarked balances.
This service provides support to communities
Although there have been delays in achieving the communities restructure savings (£38k - to
be covered from the smoothing fund) this has been more than offset by higher than budgeted
projected salary recharges to PEF . After use of the smoothing fund the resulting projected
favourable variance becomes £87k favourable.
Progression with restructure
Favourable variance
Item 14
Appendix 3
Page 187

Page 188

Page 188

Page 189

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2024/25 - BCR07
Efficiency Detail Reference
Budgeted
Amount £'000
Projection of
Total Saved
£'000
Projection of
Total Not
Saved £'000
Comment
1 Reduces the budget that funds furniture for temporary accommodation from £1,065
per property to £1,000 per property
HE07 16                         16 0
2 Reduce funding provided to  YSortIt by 25% HE02 29                         29 0
3 Reduce funding provided to  LCCR by £40k HE06 40                         40 0
4 Review the Communities team reducing the delivery of community based services CCF26 87                         49 38 Delay in implementation, in
year shortfall will be covered
by the smoothing fund. Full
year savings expected in
future years.
5 Removal of GF Contribution to Housing Asset & Investment Team HE05 50                         50 0
222 184 38
STATUS: COMPLETE
Item 14
Appendix 4
Page 189

Page 190

Page 190