Democracy Spraffa

Item 9 - Appendix 1

West Dunbartonshire Council · 20 November 2024
Back to Housing & Communities Committee — 20 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

West Dunbartonshire Council
Strategic Housing Investment Plan
2025/26 – 2029/30
Draft Final 01 November 2024
ITEM 9 -
APPENDIX 1

Page 2

TABLE OF CONTENTS
1.Introduction..........................................................................................................................................2
2.Background...........................................................................................................................................3
3.Funding ..............................................................................................................................................5
4.SHIP 2025/26 - 2029/30 PRIORITY PROJECTS.......................................................................................7
5.Priority Projects..................................................................................................................................11
6.Developer Contributions.....................................................................................................................15
7.Constraints..........................................................................................................................................15
8.Local Authority Assistance in the Delivery of the SHIP.......................................................................16
9.Delivery ............................................................................................................................................17
10.Energy Efficiency, Environmental Standards and Sustainability.......................................................17
11.Equalities Issues................................................................................................................................18
12.Strategic Environmental Assessment (SEA)......................................................................................19
13.Monitoring........................................................................................................................................19
14.Feedback...........................................................................................................................................20

Page 3

1.INTRODUCTION
1.1 This new Strategic Housing Investment Plan (SHIP) sets out West Dunbartonshire Council’s funding priorities for affordable housing in
West Dunbartonshire for the next five years in line with the West Dunbartonshire More Homes Better Homes Local Housing Strategy
2022-2027.
1.2 Every Council is required to submit an annual Strategic Housing Investment Plan (SHIP) to the Scottish Government. The SHIP sets out the
funding priorities for affordable housing in West Dunbartonshire for the next five years in line with the West Dunbartonshire More
Homes Better Homes Local Housing Strategy 2022-2027. The SHIP is an operational document rather than a strategic one.
1.3 This SHIP 2025/26 – 2029/30 is presented in the context of a significant cut in the Scottish Government’s Affordable Housing Supply
Programme which provides grant support for projects in the plan. In December 2023, the Scottish Government announced that its 2024-
25 Scottish Budget will see spend on building social homes slashed by almost £200m – a reduction of around 27%.
1.4 The planned West Dunbartonshire Council Annual Resource Planning Assumption (RPA) from the Scottish Government to help deliver
the SHIP including the Council’s own new build programme was originally set at £10.795m but this has been revised downwards
£8.477m, a reduction of 21.5%.
1.5 The SHIP sets out the revised plan for the delivery of new affordable housing and the measures we propose to put in place to mitigate the
impact of the cuts.  The SHIP will endeavour to maximise the programme of high-quality new homes in West Dunbartonshire in response
to the growing housing crisis.

Page 4

2.BACKGROUND
2.1 Each year every Council is required to submit a Strategic Housing Investment Plan (SHIP) to the Scottish Government. The West
Dunbartonshire SHIP 2024/25 – 2028/29 was approved by West Dunbartonshire’s Housing and Communities Committee in November 2023 and
submitted to the Scottish Government.
2.2 The SHIP sets out the funding priorities for affordable housing in West Dunbartonshire for the next five years in line with the West
Dunbartonshire More Homes Better Homes Local Housing Strategy 2022-2027. The SHIP is an operational document rather than a strategic one.
2.3 The SHIP detailed West Dunbartonshire Council’s plans to assist in the delivery of the Scottish Government’s target to provide 110,000
affordable homes by 2032, with at least 70% of these homes being for social rent.    The 2024/25 – 2028/29 SHIP aimed to deliver around 747
new social rented homes in West Dunbartonshire over its five-year period.  The figure for this new SHIP is around 763.
2.4 Housing Services worked with all appropriate Council service areas and consulted with the WDTRO and the West Dunbartonshire Health
and Social Care Partnership in the preparation of the Plan. Consultation took place with the RSLs operating in West Dunbartonshire through the
Housing Providers Forum and regular programme/liaison arrangements. The Scottish Government More Homes Division Glasgow and Clyde
Area Team contributed to the preparation of the SHIP.   
2.5 To assist in advance planning of housing investment, the Scottish Government advises local authorities annually of their minimum
Resource Planning Assumptions (RPA). Our RPA for 2024/25 was provisionally set at £10.795m with a prospect of an additional allocation of
£3.0m, reflective of WDC’s recent good development performance and ability to take up slack from other authorities’ programmes. 
2.6 On the basis of the funding assumptions, a healthy development programme was set out in the SHIP showing plans for a range of new
housing projects across West Dunbartonshire, reflective of identified housing needs and priorities.
2.7 In December 2023, the Deputy First Minister and Cabinet Secretary for Finance set out the Scottish Government’s proposed spending
and tax plans for the Scottish Budget 2024/2025. The announcement revealed that the Scottish Government was proposing a reduction in the
overall Housing and Buildings Standards budget from £738m this year to £533m next. This represents a cut of around £200m or 27%. These

Page 5

budget proposals were agreed in February 2024. As consequence of this, the WDC RPA for 2024-2025 was revised downwards from a minimum
of £10.795m to £8.477m, a reduction of £2.318m. 
2.7 To deliver the priority projects only shown in this SHIP it is estimated that a receipt of £47.4m Affordable Housing Supply Grant will be
required. This will only be possible if our annual Grant Planning Target from the Scottish Government is returned to recent years’ figures.  
2.8 WDC Housing and Communities Committee on 1st May noted that we are scenario planning the impact of the 24% reduction in the
2024/25 RPA and that this may have the following impacts:
• No new projects being approved in 2024/25 because of existing commitments within the programme without the developing organisations
front funding their development.
•A reduced RPA allocation of £2.318m (21.5%), representing a loss of a minimum of that figure to the wider West Dunbartonshire economy;
•A potential 32 less homes being delivered on an annual basis in West Dunbartonshire because of the reduction in funding (160 within the
lifecycle of the current Strategic Housing Investment Plan);
• Higher levels of homelessness and housing need.
2.9 The national capital resources available for future RPAs will depend on future budget decisions by the Scottish Parliament. In the
absence of future year budget assumptions, and to aid programme management, we have been advised by the Scottish Government to operate
carry-forward limits for the years 2025-26 – 2027-28 of 80%/60%/40% of current year RPA levels.
2.10 The Scottish Government is updating its SHIP Guidance, but it is unclear whether this will be issued in advance of the 30th October 2024
deadline for submission of the new SHIP.
2.11 On 1st May 2024, the Housing and Communities Committee declared a housing emergency in West Dunbartonshire, becoming the fifth
local authority to do so by that date.  On 15th May 2024, the Scottish Government too declared a housing emergency, formally recognising the
scale of the problem.

Page 6

3.FUNDING
3.1 Funding for the projects in the SHIP programme comes from two principal sources:
 the allocation from the Affordable Housing Supply Programme and
 funding from the housing providers’ sources, primarily private borrowing by RSLs and Prudential borrowing by the Council.
3.2 As noted above, our annual AHSP Resource Planning Assumption stood at £10.795m, with a possible £3.0m of additional funds. This
has dropped to £8.477m.
3.3 While we have been notified of the revised 2024/25 RPA figure there is still uncertainty beyond this date.  Colleagues in the More Homes
division recognise the importance of funding certainty in delivering new build programmes and have undertaken to address this issue as soon as
revised programmes are firmed up.  In the meantime, we have been advised that an element of over-programming should be applied to the SHIP
to allow for slippage.
3.4 Our last SHIP welcomed the then newly introduced benchmark figures which applied a welcome 16.9% uplift to the grant levels in June
2023. We have been advised that a further uplift of 5% has now been introduced, the detail of which is due soon.  While this grant level
significantly helped the viability of projects, it means that the overall budget will not stretch as far as previously, with the potential to reduce
outputs. 
3.5 For the costing of the SHIP, unless detailed costs were known, it was assumed that both Council and RSLs projects would be seeking an
average grant figure of £110,000. The current baseline benchmark support figures are £95,741 per unit for RSLs and £87,763 for Councils (3-
person equivalent plus additional quality measures).  These grants are augmented by additional quality benchmark measures which attract
extra funding.   Due to the extra levels of scrutiny involved, projects above benchmark take longer to approve.
3.6 To give a context on the current grant levels, Table 1 shows the awards for the projects which are presently on site in West
Dunbartonshire.

Page 7

Table 1:  Current Projects - AHSP Grant Awards
Project Developer Units Grant Total Unit Grant/Unit Price
Pappert WDC 26 2,471,066 95,041* / 349,253
Clydebank East WDC 88 12,604,632 143,234 /  363,137
Bellsmyre Ph 1 Caledonia HA 27 3,375,000 150,000/300,000 est
Dalquhurn Ph 4 Caledonia HA 25 2,696,552 107,892 /224,050 est
Mt Pleasant WDC 19 1,837,922 96,733 / 263,148
Bonhill Gap Sites WDC 31 4,600,000 est 148,387 est / 330,950
Gilmour Ave WDC 2 191,252 95,626 / 274,075
* Pappert also in receipt of £48,077 grant per unit from the SG Void and Derelict Land Fund.
3.7 In response to the current and projected funding difficulties, the Scottish Government has set up an advisory board of leading housing
development players to consider innovative ways in which the budget can be increased, including through the involvement of more institutional
investors.   
3.8 We will seek to explore with partner RSLs any opportunities to support the programme with funding from their financial reserves or
other sources. Some development partners are known to hold significant reserves that could be employed to ameliorate the funding crisis. In
joint discussions with the SG and RSLs we will give consideration to the use of front funding, whereby the RSL would meet the costs in the early
part of the project with the SG guaranteeing their contribution at a later date. Such an arrangement would require agreement from the SG, and
careful management of the programme, but it is an approach that has been employed in the past when funding was also particularly
constrained. We have reached agreement with one RSL over their front funding during 2024/25, on the understanding that the grant will be
guaranteed payable in 2025/26. 
4.SHIP 2025/26 - 2029/30 PRIORITY PROJECTS

Page 8

4.1        The SHIP contains a table showing the projects which are currently on site or are due on site during 2025/26. The table 2 below provides an
update and shows where progress has been made since the last SHIP was published in November 2023.
Table 2: Projects Currently On-Site/Due on Site 2025/26
Revised September 2024
Project/Developer Units Status in SHIP November 2024 Update at September 2024
Clydebank East/WDC 88
Site Start Jan 2023
Est Completion Spring 2025 but
sectional handovers from
October 2024 
Site Start Jan 2023
Est Completion Spring 2025 but sectional
handovers from October 2024 
Pappert, Alexandria/WDC 26 Site Start March 2024
Est Completion May 2025
Site Start March 2024
Est Completion May 2025
Willox Park/WDC 17 Est Site Start October 2024
Est Completion Winter 2025
Est Site Start Jan 2026
Est Completion Jan 2027
Mount Pleasant, Old Kilpatrick/
WDC 19 Site Start April 2024
Est Completion May 2025
Site Start April 2024
Est Completion May 2025
Bank St, Alexandria/WDC 22 Est Site Start January 2025
Est Completion Autumn 2025
Est Site start May 2025
Est Completion May 2026
West Thomson Street
(Clydebank Health
Centre)/WDC
42 Est Site Start July 2025
Est Completion December 2026
Est Site October 2025
Est Completion December 2026
Abbeylands Road, Faifley
(Bowling Club) / Knowes HA 27 Est Start Spring 2025
Est Completion Summer 2026
Est Site Start August 2025
Est Completion November 2026
Bellsmyre Regeneration Phase
1/Caledonia HA 27 Est Site Start November 2023
Est Completion February 2025
Est Site Start November 2024
Est Completion

Page 9

Dalquhurn Phase 4/ Caledonia
HA 25 Est Site Start November 2023
Est Completion November 2024
Site Start 01 July 2024
Est Completion July 2025
Golfhill Drive, Alexandria/
Dunbritton HA 7 Est Site Start Spring 2024
Est Completion Spring 2025
Est Site Start March 2025
Est Completion March 2026
Bonhill Gap Sites/WDC 34 Est Site Start January 2025
Est Completion Spring 2026
Est Site Start April 2025
Est Completion May 2026
Dalquhurn Phase 5 & 6/
Caledonia HA 25SR/25SE Est site Start 2024
Est Completion September 2025
Est Site Start June 2025
Est Completion December 2026
Gilmour Avenue,
Hardgate/WDC 2 Est Site Start August 2024
Est Completion November 2024
Site Start 23 September 2024
Est Completion February 2025
Dennystoun Forge/WDC 20 N/A Est Site Start September 2025
Est Completion September 2026
Queen Mary Avenue,
Drumry/WDC 16 est N/A Est Site Start October 2025
Est Completion October 2026
4.2   The SHIP lists sites which are less fully developed but which could feature in future years. Table 3 lists these sites but removes ones
that now seem unlikely to be viable in the short to medium term.
Table 3: Future Sites
Project Comments
Smollett/ Dumbuie WDC wish to build replacement homes where defective ones are being demolished.
Bellsmyre Regeneration Phases 3,4,5 Caledonia HA plan further phases to their regeneration programme, providing 78 units across
four sites.

Page 10

Auld St, Dalmuir Dalmuir Park are working on plans to provide 32 units here.
Cottage Hospital Dumbarton Dunbritton HA are in negotiation to acquire this site from the NHS to build 8 homes.
Dumbain Avenue, Haldane Wheatley Group have drawn up plans for 23 units at this site which sits within the LL&T National
Park.
Ottowa Crescent, Dalmuir Discussions with a developer over a 20-unit development on the site of a former care home. WDC
most likely to be the developer.
Artizan Centre, Dumbarton Town
Centre WDC hope to provide some housing as part of a wider town centre regeneration project.
BMQ, Mountblow The Council is in the process of the demolishing these three multi-storey blocks and plans to
provide new homes in their place. Understood to be a very difficult site to develop.
Mitchell Way The Council and some RSL developers have expressed an interest providing the housing element
of the Alexandria Town Centre regeneration.  
28 Bridge St, Alexandria WDC looking to convert/ or build anew the old hostel unit previously operated by Preparation for
Life.
Skypoint and Edinbarnet, Faifley There is development interest should social housing form part of the school reprovisioning
project.
Sheltered Housing Reprovioning Up to two sheltered housing complexes may be considered for reprovisioning due to accessibility
issues.
Bridge St, Alexandria Dunbritton HA Dunbritton HA are looking at reprovisioning of their specialist housing complex, possibly through
major refurbishment and change of client group.

Page 11

5.PRIORITY PROJECTS
5.1  When preparing the annual SHIP, each year the Council issues a “call for sites” to potential developing RSLs. Applications are then scored
to help prioritise our limited resources.
5.2 Projects considered for inclusion in the SHIP are subject to a matrix-based scoring analysis to assess their relative merits.  Various
criteria are employed in assessing and prioritising the projects:
 The strategic priorities of the Council including contributing to Covid-19 recovery plans
 Contribution towards meeting assessed housing need and demand and especially supply of
larger family homes and contributing to alleviating child poverty objectives
 Meeting regeneration /Planning objectives including support for 20 minute neighbourhood
principles
 Contribution towards satisfying specialist/ particular needs housing demand including those of
the Gypsy Traveller community
 Degree of Low carbon/energy efficiency
 SIMD Scoring
 Affordability/deliverability
 Deliverability including site constraints

 Level of subsidy required
The results of the exercise are contained inAnnexe B Scoring Matrix.
We have amended the criteria in view of the housing emergency, the ongoing homelessness crisis, and the need to give increased priority
around child poverty.

Page 12

5.3 The priority projects for this period, including those currently on site, are as shown in table 4 below. Buybacks/ROTS, which are an
important element of our strategy to increase the supply of affordable housing, are also included in these tables.  All units are social rented
unless otherwise stated and unit numbers are draft in some cases.
Table 4: SHIP 2025 - 2030: Priority Projects by Developer*
Site/Developer Number of Units
West Dunbartonshire Council
Clydebank East (post 25/26) 55
Pappert 26
Willox Park 17
Mount Pleasant 19
Bank St 22
West Thomson Street/Clydebank Health
Centre 38
Bonhill Gap Sites 34
Gilmour Avenue 2
Dennystoun Forge 20
Queen Mary Avenue 16
Buybacks/ROTS 300

Page 13

Units  549
Knowes Housing Association
Abbeylands Road, Faifley
(ex bowling club) 27
Buybacks/ROTS 32
Units   59
Dunbritton Housing Association
Golfhill Drive, Dalmonach 7
Units   7
Caledonia Housing Association
Bellsmyre Regeneration Phase 1 27
Dalquhurn Phases 4, 5&6 75*(inc 25 shared
equity)
Bellsmyre Regeneration Phase 2 33
Units   135
Dalmuir Park Housing Association

Page 14

Buybacks/ROTS 12
Units  12
TOTAL PRIORITY PROJECTS 762
* All homes are social rented unless otherwise stated and it includes projects currently on site.
5.4 Annexe A of this report, Affordable Housing Supply Programme: Years 2025/26 -2029/30 provides further details of the projects
contained in this SHIP.
5.5 WDC operates a very popular “Buy Back” scheme whereby the Council can re-purchase vacant Right to Buy and other houses which are
on the market, to help meet strategic housing objectives, including regeneration projects.  The scheme has grown significantly in recent years
with support from the AHSP. The buyback scheme provides support to the Rapid Rehousing Transition Plan and other strategic priorities.
Criteria apply to the buyback programme to ensure that the properties being considered will help address housing need.  For example, in
response to the identified high demand, we place an emphasis on acquiring larger family homes in this and in any West Dunbartonshire RSL
Rental Off the Shelf schemes (ROTS).  The Scottish Government are supporting larger family home acquisitions with above benchmark grant
awards where appropriate.  
Currently we are estimating that 300 units will be acquired by the Council through this route as well a further number by RSLs via ROTS. While
budget pressures might suggest that these figures could reduce, extra money allocated to the National Acquisition scheme may bolster this side
of the new supply programme.
5.6 Excluding the reserve projects, the SHIP shows the provision of almost 770 affordable rented homes over the 5-year plan period. The
delivery of this ambitious plan will depend upon the ongoing support of our developing RSL partners and, in particular, appropriate funding from
the Scottish Government.
5.7 While almost all projects contained in this SHIP are for social rent, a small number of shared equity units are proposed by Caledonia HA.
Further investigation of the market for alternative tenures requires to has been carried out which suggests there may be an interest in certain

Page 15

areas of West Dunbartonshire. WDC plans to establish two limited liability partnerships to deliver alternative affordable tenures; Mid-market
rent and Home Ownership Made Easy.
5.8 More than ever before, due to the funding uncertainty, the SHIP will require to show flexibility and be subject to continual monitoring to
best deliver on its objectives. Projects which fall behind on their programmed dates may be overtaken by ones in the “shadow programme.”  As
it stands, the programme is predicated on front funding being available for a number of projects.  The More Homes Board will be the lead
monitoring vehicle with input from programme review meetings with the Scottish Government and developers.
5.9 The SHIP scoring matrix contains a longer list of projects which have been brought forward for consideration. These are considered to be
reserve projects. If there is slippage, or if additional funding becomes available, some of these projects may be introduced into the programme.
We will remain open to consideration of other projects which may be presented during the course of this plan period, indeed these would be
welcomed, though bearing in mind that resources are likely to be much more limited during this period.
6.DEVELOPER CONTRIBUTIONS
6.1 At present there is no Affordable Housing Policy in West Dunbartonshire, and there is no projected receipt from this source. The
introduction of NPF4 may signal a change in how housing site allocations are made by tenure in West Dunbartonshire. Further discussions will
take place with our Planning colleagues in the consultation over the new Local Development Plan.
7.CONSTRAINTS
7.1 Scottish Government guidance indicates that SHIPs should have an emphasis on deliverability.  In preparing the SHIP, every effort has
been made to take account of any constraints that may affect the delivery of the projects and this is taken account of in the assessment
scoring. We have also taken cognisance of the funding cuts as well as the increased average unit costs, especially for our much-needed larger
family homes.  There is recognition that many of the larger and easier sites, including a number of the ex-school sites, have been developed in
previous years and that the programme outlined in this Plan may be more problematic to achieve. The SHIP will require to demonstrate

Page 16

flexibility in programming of its projects and it is understood that the programme may have to be further elongated to match available
resources.
7.2 A number of the projects contained in this SHIP are at the early stage of their development and the full issues/constraints are not
known at this stage. For example, a number of the projects contained within the SHIP are not at the stage of having the necessary Planning
consents or Building Warrants.
8.LOCAL AUTHORITY ASSISTANCE IN THE DELIVERY OF THE SHIP
8.1 The Council is committed to assist where possible in the delivery of the SHIP projects within the context of the More Homes West
Dunbartonshire initiative as outlined in the Local Housing Strategy.
8.2 Within the Council, the officers’ More Homes Board monitors the delivery of the new council home element of the programme and will
continue to seek to identify additional sites to extend the Council’s new build programme, supported by prudential borrowing, the AHSP and the
Council’s rent pooling strengths. The Council has drawn up a Housing Emergency Action Plan which features the need to increase the supply of
affordable homes and this plan is monitored and given impetus through the More Homes Board.
8.3 Land has previously been made available by the Council at below market value to facilitate the development of affordable housing to
meet identified needs. However, there is a need to balance this against the Housing Revenue Account’s interests and the very significant
pressures facing Council budgets.   In addition, the Council is mindful of the need to balance the provision of private sector and affordable
housing sites to meet our Housing Supply Targets.
8.4 Vacant sites in the Housing Revenue Account, or areas of surplus stock, have generally been made available to support the development
of social rented housing where appropriate.  The costs of acquiring all sites will be reviewed on a case-by-case basis and the Council as a
developing organisation and our partner housing associations will be expected to review their ability to make full use of existing assets and
borrowing capacity.

Page 17

8.5 Housing will continue work closely with Planning colleagues to ensure an adequate supply of development land to meet the increased
targets within the context of the Local Development Plan and through the More Homes Board.  As noted above, in light of the introduction of
NPF4 further consideration will be given to how housing sites are allocated by tenure through the Planning process. 
8.6 Throughout the lifetime of this new Strategic Housing Investment Plan, the Council will continue to explore options around innovative
delivery mechanisms to expand the supply of affordable housing.
9.DELIVERY
9.1 In terms of the procurement arrangement noted above, there may be an opportunity in the future to widen the scope to include other
partner developers in the programme. In addition, scoping will continue of other new frameworks as they become available to ensure the
delivery of the programme and of best value.
9.2 Officers from the Housing Development team regularly engage with local house builders interested in the delivery of affordable housing
in West Dunbartonshire, either through partnering RSLs or directly with the CouncilWesAt the time of writing such discussions are taking place
over two projects in the Clydebank area.  
10.ENERGY EFFICIENCY, ENVIRONMENTAL STANDARDS AND SUSTAINABILITY
10.1 Local Authorities are among a wide range of public bodies required to meet the duties place on them by the Climate Change (Scotland)
Act 2009.   In this context, developments arising from the SHIP must take account of the change agenda. New Build developments must
contribute to the Single Outcome Agreement local outcome commitment to reduce fuel poverty.
10.2 In tandem with this new SHIP, the Council is introducing a revised and updated version of its pioneering higher standard for all Council
and Housing Association homes being built in West Dunbartonshire, the West Dunbartonshire Design Standard.

Page 18

The Standard applies to all new build projects being supported by the Affordable Housing Supply Programme in the SHIP programme and
requires these homes will achieve Net Zero or Passivhaus standard and Energy Efficiency Rating of B.  As well as improving energy efficiency, the
policy encourages better accessibility, external design, and internal space standards. The inclusion of such a standard at this stage anticipates
the forthcoming Scottish-wide regulation on this issue.
10.3 As well as using the more commonly employed air source heating pumps we are investigating the use of ground source heating systems
(GSH) which, while currently more expensive to install, may prove to be more efficient and easier to maintain in the longer term. Efficiencies
may be achieved by grouping these heating systems to serve a housing project and this is an area for possible development. It is hoped that the
installation of exhaust air pumps will provide a cost-efficient heating, hot-water, and ventilation solution in some of our new developments.
10.4 The Council continues to encourage the consideration of district heating systems or other innovative measures that contribute to
meeting climate change objectives. The innovative district heating scheme at Queens Quay, Clydebank is being rolled out to nearby projects
including housing ones.
11.EQUALITIES ISSUES
11.1 West Dunbartonshire Council is committed to delivering good quality services which are underpinned by a clear understanding of
Equality and Diversity and to promoting and sustaining equality and inclusion, and equality and diversity principles.
11.2 An equalities impact assessment was carried out on this SHIP which predicted that the measures proposed would have an
overwhelmingly positive impact. 
12.STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)

Page 19

12.1 A Strategic Environmental Assessment (SEA) pre-screening report has been carried out in respect of the parent Local Housing Strategy.
The Council has determined that a SEA is not required in this instance. 
13.MONITORING
13.1 Monitoring of progress will be carried out through the Council’s performance management system and through key structures such as the
Strategic Housing Providers Forum, the Housing Improvement Board, the More Homes Board and programme review meetings with the Scottish
Government.  A new SHIP will be submitted annually to the Scottish Government each October following approval by the Housing and
Communities Committee
14.FEEDBACK
For more information, or if you want this information in a different format or language, please use the contact details below:

Page 20

Housing Development Team
Housing Development and Homelessness
Housing and Employability
West Dunbartonshire Council
John Kerr    Housing Development and Homelessness Manager
Phone: (01389) 737889
Email: John .Kerr@ west-dunbarton.gov.uk
Jamie Dockery    Senior Housing Development Officer
Phone:
Email: Jamie.Dockery@ west-dunbarton.gov.uk
Jackie McRory    Senior Housing Development Officer
Phone: (01389) 737591
Email: Jackie.McRory@ west-dunbarton.gov.uk
Emily Dorrian   Senior Housing Development Officer
Phone:
Email: Emily.Dorrian@ west-dunbarton.gov.uk