Argyll and Bute Council             
Education 
PROPOSAL DOCUMENT:  August 2023 
Review of Education Provision 
Achaleven Primary School 
Appendix A

Page 2

2 
Proposal for the closure of Achaleven Primary School 
SUMMARY PROPOSAL 
It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. 
The catchment area of Lochnell Primary School shall be extended to include the
current catchment area of Achaleven Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
 Achaleven Primary School has been mothballed for two years. The school
roll is currently zero, and is not predicted to rise significantly in the near
future.
 Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 16.29 teacher
and head teacher vacancies in Argyll and Bute.
 Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance. The annual cost of the mothballing of the school
building is currently around £15,866. 
This document has been issued by Argyll and Bute Council in regard to a
proposal under the Schools (Consultation) (Scotland) Act 2010, as amended. 
This document has been prepared by the Council’s Education Service with
input from other Council Services.   
DISTRIBUTION 
A copy of this document is available on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals  
A summary of this document will be provided to:
 The Parent Councils of the affected schools
 The parents of the pupils at the affected schools
 Parents of children expected to attend an affected school within 2
years of the date of publication of this Proposal Document
 The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools
 The teaching and ancillary staff at the affected schools
 The trade unions representatives of the above staff
 Argyll and Bute Councillors – Ward 5: Oban North and Lorn
 Connel Community Council
 Ardchattan Community Council

Page 3

3 
 Dunbeg Community Council
 Community Planning Partnership 
 Relevant users of the affected schools
 The Constituency MSP
 List MSPs for the area
 The Constituency MP
 Chief Superintendent, Police Scotland
 Chief Executive, NHS Highland
 Chief Executive Strathclyde Partnership for Transport (SPT)
 Area Commander, Fire Scotland
 Education Scotland 
A copy of this document is also available from: 
 Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
 Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
 Lochnell Primary School, Benderloch, Oban, Argyll, PA37 1QS
 Dunbeg Primary School, Dunbeg, Argyll, PA37 1QF
 Connel Village Hall, Lora Rd, Connel, Argyll PA37 1PA
 Oban Library, 77 Albany Street, Oban PA34 5AL

Page 4

4 
This document is available in alternative formats or in translated form for
readers whose first language is not English. 
If you would like this document in another language or format, or if you require
the services of an interpreter, please apply to the Executive Director, Argyll
and Bute Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT.   
Jezeli chcieliby Pañstwo otrzymaO ten dokument w innym jzyku lub w
innym formacie albo jeeIi potrzebna jest pomoc Uumacza, to prosimy o
kontakt z nami.

Page 5

5 
1 INTRODUCTION  
1.1 On 10th June 2021 Argyll and Bute Council approved the mothballing of
Achaleven Primary School. The Council agreed that in the event there
are no registered pupils by the commencement of session 2022/23 the
school be considered for formal closure through the statutory process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=1
4218&Ver=4 
1.2 On 25th August 2022, the Community Services Committee agreed that
the Education Service would undertake the required preliminary
consultation and an Options Appraisal for Achaleven Primary School. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=1
4784&Ver=4 
1.3 The Community Services Committee received a report on 9th March
2023 providing details of the Options Appraisal for Achaleven Primary
School; carried out in accordance with the preliminary requirements set
out in Section 12A of the Schools (Consultation)(Scotland) Act 2010, as
amended. The Committee agreed to note the outcome of this
consideration of the preliminary requirements and requested that
officers formulate a draft proposal for consideration at the meeting of
the Community Services Committee on 24th August 2023  which, if
approved, would subsequently trigger the formal consultation process
under the Schools (Consultation) (Scotland) Act 2010. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=1
5032&Ver=4 
1.4 The statutory process for the closure of a rural school is laid out in the
Schools (Consultation) (Scotland) Act 2010 as amended by the
Children and Young People (Scotland) Act 2014. The Act, as amended,
introduced a presumption against closure of a rural school and details
specific requirements which the education authority is required to follow
if they are formulating a proposal to close a rural school. This includes
the introduction of certain preliminary requirements which must be
satisfied prior to the formulation of a proposal.   
1.5 In addition, the Community Empowerment (Scotland) Act 2015 sets out
a new right for community organisations to request the transfer of local
assets into local community ownership/management. This may be
something that the Community wish to consider as part of or as a
consequence of this process. Public bodies including Councils must

Page 6

6 
consider such requests and make a decision within six months of
receiving a valid request. 
1.6 Achaleven Primary School has had zero pupils enrolled since August
2021. 
1.7 There is a requirement to have special regard to the rural schools
factors prior to formulating a proposal to close a rural school. In
particular it is necessary to consider any reasonable alternatives before
considering closure. It is also necessary to consider the impact on the
wider community of a potential closure and the impact of any different
travel arrangements. These factors have been considered in the
preliminary requirements which were undertaken prior to this proposal
being written. A full assessment of the preliminary requirements is set
out in the Options Appraisal, which is attached as Appendix 5 
1.8 A new Corporate Plan (2023-2027) was agreed by the Council 29th
June 2023. The Plan contains a new set of Council Priorities. The
Argyll and Bute Corporate Plan 2023-2027 states its vision of a
successful and vibrant Argyll and Bute with a growing population and
thriving economy. The area has a rich mix of remote, rural and island
communities. The Council will use its strong track record in partnership
working, at all levels, to secure the best possible outcomes. 
In the Corporate Plan for 2023-2027 through the agreed priorities, the
will ensure: 
 Children and young people will attain and achieve at all stages.
We will improve outcomes for our children and young people. 
 Our schools are effective, sustainable learning environments.
 Continued support for all of our children and young people with
additional support needs across Argyll and Bute, within our
schools and other service areas.
 We will support connections to, from and within Argyll and Bute.
 Recognition of the importance of marine connections to and
from our island and mainland communities and our role in
maintaining these links.
 We will reduce our carbon emissions.
 We seek to increase availability of all types of housing, including
affordable homes.
 We build up and strengthen our communities as attractive,
vibrant places to live, work and do business.
 We make assets work now while we plan for and invest in the
future.
 We commit to working in partnership wherever we need to as
well as calling on others, with responsibility, to take action that is
required to safeguard Argyll and Bute’s success.

Page 7

7 
1.9 The Council, as an Education Authority, has a statutory duty in terms of
the Education (Scotland) Act 1980 to make adequate and efficient
provision of school education across their entire area for the current
school population and future pattern of demand. This is reflected in
“Our Children, Their Future” which is the Education Vision and Strategy
for Argyll and Bute Council. 
2 PROPOSAL 
2.1 It is proposed that education provision at Achaleven Primary School be
permanently discontinued with effect from 31st May 2024. The
catchment area of Lochnell Primary School shall be extended to
include the current catchment area of Achaleven Primary School. 
Reasons for this proposal 
2.2  This is considered to be the best option to address the reasons for the
proposal, which are: 
 Achaleven Primary School has been mothballed for 2 years. The
school roll is currently zero, and is not predicted to rise significantly
in the near future.
 Along with several other rural councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there
are 16.29 fte teacher and head teacher vacancies in Argyll and
Bute.
 Whilst the school is mothballed, the building is deteriorating with
limited budget for maintenance. The annual cost of the mothballing
of the building is currently £15,866. 
Additional Considerations 
 The Council needs to allocate its resources in a way that ensures the
quality of all of its services; 
 This proposal will bring educational benefits and assist in ensuring that
the Education budget is more sustainable into the future. This proposal
document contains an Educational Benefits Statement; 
 The costs per pupil in under-occupied schools are excessively high; 
 Schools in the Council area are expensive to maintain and operate.
Retaining unnecessary accomodation is a serious drain on the
resources of the Council and diverts spending from areas that directly
affect the educational attainment of pupils; and 
 There is no realistic possibility at present of the Council being able to
bring its whole school estate up to a satisfactory condition. The present

Page 8

8 
condition is unsustainable and can only be improved by reducing the
extent of the estate. 
3 PRELIMINARY REQUIREMENTS 
3.1 The Council is required to consider the future of Achaleven Primary
School, as it has been mothballed for 2 years. The Council have
considered the reasons for making this proposal, and have also
considered other viable alternatives, the likely effects on the community
and the likely effects of different travelling arrangements as a
consequence of this proposal. Financial implications were also
considered. Some of these figures have been recalculated since the
Options Appraisal was produced. 
3.2 The Council considered how the implementation of this proposal would
impact on the education of the children affected. The Council also
considered the impact on the children who currently live in the
catchment area but attend other schools, as well as children who may
potentially live in the catchment area in the future.   
3.3 The place of the school in the community was also considered, in terms
of the impact this proposal would have on the sustainability of the
community itself. Since its mothballing, the school premises has not
been used for any meetings or events, as these tend to be held in
Connel Village Hall, a short distance (approximately 300 yards) from
the school. 
3.4 Impact on the environment was taken into account during the initial pre-
consultation process. This included a consideration of the transport
implications if this proposal was to be implemented. 
3.5 Four options were presented to the local community by the Council for
consideration during the pre-consultation phase, as required by section
12A of the 2010 Act.   
3.6 Of the four options which were considered by the community and the
Council; (d) is the option favoured by the Council, as it was considered
it most adequately addressed the reasons for the proposal. 
a) Re-open Achaleven Primary School,
b) Continued Mothballing of Achaleven Primary with pupils zoned to
either Lochnell or Dunbeg Primary School,
c) Close Achaleven Primary School and realign its catchment area to
Dunbeg Primary School.
d) Close Achaleven Primary School and realign its catchment area to
Lochnell Primary School (The Proposal). 
When considering the above options; the positive educational benefits
of Lochnell Primary School alongside the factors of projected low pupil

Page 9

9 
numbers, the challenges in recruiting teaching staff and the
considerable expenditure needed to bring the building up to standard at
Achaleven Primary School; in addition the lack of local support for
reopening Achaleven Primary School; option (d) was considered the
most appropriate response to the underlying reasons behind
consideration of this proposal. 
3.7 Following from an initial Options Appraisal which was presented to the
Council’s Community Services Committee on 9th March 2023, it was
agreed that the preliminary requirements were satisfied enabling the
draft proposal to be formulated, with the option to close Achaleven
Primary School and realign its catchment area to Lochnell Primary
School being identified as the most adequate means of addressing the
reasons for the possible proposal.  
3.8 During the preliminary consultation regarding the future options for
Achaleven Primary School, there were a range of viewpoints gathered
from parents, young people and members of the community. 
3.9 The majority of the community were in agreement that the low numbers
of children did not make the re-opening of the school realistic. There
was a small percentage of people in support of continued mothballing
in order to retain the building in case of future need. The majority of the
community felt that it would be disappointing if the building lay empty
and became derelict and were keen to explore other options for the
building should the school close permanently. Parents of very young
children expressed concern that the school may be closed, but agreed
this may be the best option when projected numbers were clarified. 
3.10 Closing the school would have no impact on staff or pupil travel from
the current arrangement. There would be no alteration to the current
travelling arrangements or environmental impact.   
Alternatives to the Proposal 
3.11 The community engagement process prior to the drafting of this
proposal considered the views of members of the community and also
considered any other alternatives to the closure of Achaleven Primary
School. Full details from the community engagement and the findings
from the preliminary requirements, to include the alternative proposals
are attached as Appendix 5.  
3.12 In conclusion, after the pre-consultation with the community, the
Council feels that the proposal to close Achaleven Primary School and
realign its catchment area to Lochnell Primary School is the most
reasonable means to address the underlying reasons for considering
the future of Achaleven Primary School. Further detail is provided in
relation to educational benefits, travel, environmental impact,
community impact and financial impact below.

Page 10

10 
4 ASSESSMENT OF THE PROPOSAL 
4.1 It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochnell Primary School shall be extended to include the current
catchment area of Achaleven Primary School. (See Appendix 3.) 
4.2 Achaleven Primary School has been mothballed for two years. The
school condition will deteriorate with limited budgets for maintenance.
The school roll is currently zero and is not predicted to rise significantly
in the near future. The annual cost of the mothballing of the building
has increased to £15,866 since the Options Appraisal was produced. 
4.3 Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
16.29 fte teacher and head teacher vacancies in Argyll and Bute. 
4.4 The Council needs to allocate its resources in a way that ensures the
quality of all of its services. 
4.5 This proposal will bring educational benefits and assist in ensuring that
the Education budget is more sustainable into the future. 
4.6 The costs per pupil in under-occupied schools are excessively high. 
4.7 Schools in the Council area are expensive to maintain and operate. 
Retaining unnecessary accomodation is a serious drain on the
resources of the Council and diverts spending from areas that directly
affect the educational attainment of pupils. 
4.8 There is no realistic possibility at present of the Council being able to
bring its whole school estate up to a satisfactory condition. The present
condition is unsustainable and can only be improved by reducing the
extent of the estate. 
4.9 As part of the preliminary requirements in the drafting of this proposal,
the Council considered four options. The option favoured by the
Council is (d), as it was considered it most adequately addressed the
reasons for the proposal. 
a) Re-open Achaleven Primary School,
b) Continued Mothballing of Achaleven Primary with pupils zoned to
either Lochnell or Dunbeg Primary School,
c) Close Achaleven Primary School and realign its catchment area to
Dunbeg Primary School.
d) Close Achaleven Primary School and realign its catchment area to
Lochnell Primary School (The Proposal).

Page 11

11 
4.10 Having considered these alternatives the Council has made an initial
assessment that these are not viable alternatives to the proposal, and
will proceed to consult on the proposal to close Achaleven Primary
School and extend the catchment area of Lochnell Primary School. 
4.11 The Council has undertaken an appraisal on impact if this proposal was
to be implemented. This includes an assessment of: 
 The school roll and predicted school roll;
 Teacher numbers; and
 The condition of the building. 
4.12 The Council has carefully considered and reviewed the steps it has
taken to address the underlying reasons for the proposal (as outlined at
Section 2.2, above), prior to formulating this Proposal Paper. 
4.12.1 In relation to the decline in the school roll, and no material
increase being predicted in the forthcoming years, the School
was mothballed two years ago as a result of a change to the
School’s circumstances – i.e. the school roll falling to zero as of
August 2021. The Education Authority therefore decided to
mothball the school as a temporary measure – in order to
monitor the situation and assess whether there was any
likelihood of the school roll increasing to the extent that the
School became viable again in the near future. The mothballing
was subject to review at least annually and the Education
Service undertook to review the position should any further
school age pupils move into the catchment area and/or if they
demonstrated a sufficient level of demand for the School to
justify its re-opening. As mentioned above, the School has been
mothballed for two years, and its roll is not predicted to rise in
the forthcoming years to a level which would make the School
suitable for re-opening. As there has been no material change in
circumstance evidenced, and having kept the position under
review via mothballing for two years, the Education Service are
of the view that matters should now move forward in the form of
a statutory closure consultation in order to determine the future
of Achaleven Primary School. This approach aligns with that
suggested by the Statutory Guidance for the 2010 Act, and
Paragraphs 63-65 in particular. Further details in relation to the
School roll are set out at Section 5 of this Proposal Paper. 
4.12.2 In relation to the underlying reason for this proposal in regards
to recruitment of teachers, the issues that have been faced by
the Education Service regarding the recruitment of teachers to
Achaleven Primary School are detailed at Section 6 of this
Proposal Paper. Since the School’s mothballing, in order to
address this particular issue, and prior to formulating this
proposal, the Education Service have offered a number of posts
across the Authority area on a permanent basis to a locality,

Page 12

12 
rather than to a temporary school, as an attempt to increase the
likelihood of attracting a permanent post. The Council has also
entered into a strategic housing agreement with social housing
partners to support staff with sourcing accommodation (which is
a particular pressure in remote areas of Argyll and Bute), as well
as offering relocation packages. Furthermore, the Education
Service continues to work with UHI Argyll to recruit more local
candidates for teacher training. Notwithstanding these efforts,
the recruitment of teaching staff within Argyll and Bute remains a
considerable challenge, hence why it is still a main underlying
reason for this closure proposal. 
4.12.3 In relation to the underlying reason for this proposal concerning
the condition of the school premises, the school property will
continue to deteriorate whilst it remains mothballed. As
mentioned at Paragraph 4.12.1, above, there is currently no
evidence to suggest that the School will become viable for re-
opening in the near future. Whilst the School remains
mothballed, it costs the Council £15,866 annually. Accordingly,
the Education Service are now seeking approval to proceed with
a statutory closure consultation which, if subsequently
implemented, will allow the Education Service to use any
savings generated to the benefit of the other occupied schools
and pupils within the Education Authority’s area. It may also
allow for any plans for other uses of the School property to be
progressed, as it will need to be permanently discontinued as an
educational establishment in the first instance. Further
information about the condition of the School building and
premises can be found at Section 7 of this Proposal Paper 
4.13 The council has also undertaken an assessment of likely educational
benefits or effects which this proposal may have if implemented on: 
 The pupils of any affected school; 
 Any other users of the school’s facilities;
 Any children who would (in the future but for implementation) be
likely to become pupils of the school; and
 The pupils of any other schools in the Council area. 
4.14 In addition, the Council has also considered how to minimise or avoid
any adverse educational effects that may arise from the implementation
of this proposal. 
4.15 The Council has also had special regard to the following factors if this
proposal was to be implemented, as Achaleven Primary School is
classified as a remote rural school. 
 Likely effect on the local community to be assessed by
reference to:

Page 13

13 
o The sustainability of the community; and
o Availability of the school’s premises and other facilities for
use by the school community. 
 Likely effect caused by different travelling arrangements by
reference to the effect caused by such arrangements on: 
o Environmental impact; and
o The schools pupils and staff and other users of the
schools facilities. 
4.16 Finally, the Council has also considered the financial implications of
implementation of the proposal and information on this is set out later in
this document. 
5 SCHOOL ROLL 
5.1 The information in relation to the school roll as shown below is drawn
from the yearly pupil census, which takes place in September each
year. School rolls by their very nature may fluctuate slightly on an
ongoing basis due to changes in pupil numbers as a result of pupils
moving to and from the catchment area. 
The school roll of Achaleven Primary School has seen a steady decline
since 2008: 
Table 2:  Achaleven Dunbeg  Lochnell
Capacity 41 174 147   
Roll Roll Roll
2008-2009 39 80 92
2009-2010 27 81 87
2010-2011 8 79 92
2011-2012 0 76 96
2012-2013 4 73 101
2013-2014 5 76 112
2014-2015 9 81 109
2015-2016 10 82 114
2016-2017 12 78 124
2017-2018 9 99 130
2018-2019 13 88 124
2019-2020 9 98 114
2020-2021 7 90 112
2021-22 0 88 119

Page 14

14 
2022-23 0 89 118 
Predicted Roll 
Table 3:  Achaleven Dunbeg  Lochnell
Capacity 41 174 147   
Roll Roll Roll
2023 -2024 0 125 116
2024 -2025 4 128 114
2025-2026 4 130 122     
* A prediction based on information available June 2023. 
5.2 In 2022 - 2023 there are 52 school aged children who live in the
Achaleven Primary School catchment area and who attend other
schools. This includes children within a cross boundary area with
Achaleven Primary School and those children who attend the
denominational primary school (St Columba’s Primary School) in Oban. 
5.3 There are currently 16 school aged pupils who live in the Achaleven
catchment area who attend Lochnell Primary School and 13 who attend
Dunbeg Primary School. 
5.4 Whilst there is a slight rise in the predicted school roll for the
forthcoming years, the historical trend has been for parents to make
placing requests to neighbouring schools. Those in the cross boundary
area of Achaleven and Lochnell Primary tend to send their children to
Lochnell. This coming school year there are 7 children (as at July 2023)
from Achaleven catchment due to start school in August 23. However,
all of those families in the cross boundary area have chosen Lochnell,
and the remaining children will attend other local schools by virtue of
placing requests. 
5.5 The school roll is not predicted to rise significantly in the future. The
area around Achaleven is a small settlement and is not identified for
growth in the Local Development Plan: https://www.argyll-
bute.gov.uk/ldp 
5.6 There is currently only one residential development within the             
Achaleven catchment area. 
6 TEACHER NUMBERS

Page 15

15 
6.1 Teacher numbers are improving nationally, with a 6.3% increase in the
number of teachers nationally from 2016 - 2022. In Argyll and Bute
there has been a 3.1% reduction in the fte number of teachers from
2016- 2022 
6.2 As the school has been mothballed for two years, the issue of
recruitment of staff has not improved.  At the time of writing there are
16.29 fte teacher and head teacher vacancies in Argyll and Bute.
Despite a sustained effort to secure permanent staff, there is no reason
to think that staffing would not continue to be a considerable challenge
for Achaleven Primary School. 
6.3 At the current time, if the proposal was to be implemented, there would
be no impact on staffing levels at Lochnell Primary School. 
7 CONDITION OF THE BUILDING 
7.1 Argyll and Bute Council’s School Estate Management Planning process
identified in 2022 that the condition of Achaleven Primary School was
satisfactory and graded a B. 
7.2 The original costs for re-opening the building remain the same as the
Option Appraisal (See Appendix 5), the running costs of continuing to
retain the building whilst mothballed have considerably increased (See
Appendix 4). 
7.2 As part of the consultation process the Council would be open to
discussion with the community in regard to the future of the building.
This might involve the transfer of the property to a recognised
community group through the provisions of the Community
Empowerment (Scotland) Act 2015 or some other agreed mechanism.
This may provide the community with an opportunity to utilise the
building as a driver for community benefit and potential regeneration
that could also enhance the sustainability of the community. 
EDUCATIONAL BENEFITS STATEMENT 
8 Assessment of likely educational benefits on pupils 
8.1 If this proposal is implemented, the Council believes that there will be
considerable educational benefits arising from this.  These centre
around; 
 Learning and teaching;
 Meeting learners needs;
 Broadening the range of opportunities; and
 The environment for learning.

Page 16

16 
8.2 This statement focusses on Lochnell Primary School, which is the
school the majority of pupils from the Achaleven Primary School
catchment area currently attend. 
8.3 The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. There are no specific
educational benefits from reopening Achaleven Primary School as all
schools implement Curriculum for Excellence ensuring effective
learning and teaching which is matched to the needs of children.
Continued attendance of pupils at other schools allows children to
experience a curriculum which is matched to their needs. 
8.4 Achaleven and Lochnell Primary Schools are remote rural schools.
Each school is set within a remote rural area (Scottish Government
classification). Although there are 52 school aged children in the
Achaleven Primary School catchment area, children from the
Achaleven Primary School catchment area who attend Lochnell
Primary School continue to benefit from education in a locality familiar
to them, and still relatively close to home. 
8.5 The co-location of the Early Learning Centre (ELC) and the primary
classes at Lochnell Primary School enables a strong transition process
between the ELC and school and includes joint early level learning
every week. 
9 Learning and Teaching 
9.1 The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to help
every child and young person to develop knowledge, skills and
attributes for success in learning, life and work. In Lochnell Primary
School, children are encouraged to be eager and active participants
who are engaged, resilient and highly motivated during their learning.
Children know that their views are sought, valued and acted upon. 
9.2 The learning environment encourages high level of achievement,
providing a wide range of opportunities for children to achieve their full
potential within the four contexts of learning. In Lochnell Primary
School children may be taught in classes composed of children from
more than one year group. Children benefit from being part of a social
context in which they can build relationships with different groups and
individuals, develop social skills, meet challenges and exercise
responsibilities as members of a social group. They are able to interact
and socialise with groups of children, take part in team activities and
move with their peers to secondary school.

Page 17

17 
9.3 There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement
Framework priorities include raising attainment for all, and closing the
gap between the most and least disadvantaged children. 
9.4 The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. 
9.5 At Lochnell Primary School, staff are challenged and supported through
a range of continuous professional development and review
opportunities gained by working and learning with a range of
colleagues. Lochnell Primary School is part of the Oban, Lorne and the
Isles Cluster, which means that staff can be supported together,
moderation and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within Lochnell Primary
School are able to support and challenge each other on a daily basis.
The whole staff are able to bring a range of talents and skills to benefit
outcomes for learners. 
9.6 Lochnell Primary School encourages nurturing and positivity. One
aspect of this work is a successful Buddy System. Children from
different stages work and learn together. This vertical support is
particularly evident through events such as sports day and during
breaks and lunch when groups of children are together in a social
context. This system develops and benefits both the ‘buddy’ and the
‘buddied’. This system works well and benefits the wide range of
children in the school. 
10 Meeting learners’ needs 
10.1 Through the Getting it Right for Every Child (GIRFEC), practice model,
meeting the needs of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the opportunity to
reach their potential. Careful tracking and monitoring procedures are in
place to evidence pupil progress. This includes professional dialogue
with teachers, learning discussions with children, classroom
observations, assessment and looking at pupil work.   
10.2 The school also has planned meetings and discussions with parents. 
These discussions between home and school improve parental
engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively with
other agencies and parents to ensure the needs of each child are met.
In the primary classes, standards of attainment have been maintained
over the last three years. Majority of children are achieving national

Page 18

18 
expectations in reading, writing, listening, talking and numeracy. 
Health and Wellbeing continues to develop within the Emotion Works
programme which supports positive behaviours and relationship within
the school. 
10.3 The staff, parent body and partner groups also bring opportunities for
increased collaborative working. This applies both in terms of the wider
curriculum and within aspects of the curriculum that may be enhanced
by staff individual expertise e.g. PE, language, STEM, expressive arts
teaching. 
10.4 A ‘Respect Me’ policy is built into class lessons and permeates the
whole school ethos through assemblies and class work on rights and
responsibilities. The school has achieved its Bronze Nurture Award and
is working towards  the Silver Award, it is also working towards Rights
Respecting School accreditation 
11 Broadening the Range of Opportunities 
11.1 Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future. 
11.2 There is also a strong transition planning process between Lochnell
Primary School and Oban High School, which involves increased
opportunities for children to participate and to make new connections. 
11.3 Children are provided with a variety of experiences to develop their
sense of responsibility, independence, confidence and enterprising
attitude. The school has an active Pupil Council and ECO Group. 
11.4 Across the school children are engaged with learning and contribute
well in lessons. Staff promote positive relationships at all levels and
also through the Young Sports Leaders programme, the impact of this
being that children enjoy good relationships with their peers, young
leaders feel confident and entrusted to take these developments
forward. 
12 Environment for Learning 
12.1 Lochnell Primary School is a suitably-equipped and well supported
school, situated in Lochnell. The entire building is well maintained and
along with the surrounding scenery provides attractive accommodation
for the Lochnell Primary School. The school has an all-weather pitch
adjacent to the school, which is well utilised. The building has facilities
for pupils and visitors with special access needs.

Page 19

19 
12.2 Any mitigating effects around the adverse weather and transport issues
are outweighed by the benefits of this proposal. 
12.3 In summary, there are a range of educational benefits for pupils if this
proposal was to be implemented, as summarised in the paragraphs
above.  There are benefits for the development of social and emotional
skills, as well as the educational benefits resultant from access to a
more diverse curriculum. The learning environment in Lochnell Primary
School also offers children the opportunity to participate in a wider
range of active learning strategies. 
13 Assessment of likely educational benefits on other users of the
school’s facilities 
Implications for staff 
13.1 If this proposal is implemented, there will be no new implications for
teaching and ancillary staff in Lochnell Primary School.   
13.2 If this proposal is implemented, the Council does not envisage any
adverse effects from the proposal in respect of staffing.  Should issues
arise however, these will be mitigated through the Council Educational
Management Team support structure. 
Early Learning Centre Users – Pre Five Children 
13.3 The co-location for the Early Learning Centre (ELC) and the primary
classes at Lochnell Primary School enables a strong transition process
between the ELC and the school and includes joint early level learning
every week. 
14 Assessment of likely educational benefits on any children who
would (in the future but for implementation) be likely to become
pupils of the school. 
Existing and future pupils 
14.1 Children who may live in this catchment area in the future will benefit
from the broad range of educational opportunities which are presented
through this proposal, as detailed above. 
14.2 There would be positive educational benefits associated with this
proposal. The management arrangements of the school would be
strengthened and there would be opportunities for increasing the range
of the curriculum and increasing the use of active pedagogies.   
14.3 The proposal could increase the roll of Lochnell Primary School and
would thus extend the peer group for all pupils, present and future.

Page 20

20 
The larger school should be able to support a wider range of social and
extra-curricular activities.   
14.4 Pupils who would otherwise have attended Achaleven Primary School,
would benefit from daily interaction in a larger peer group and from
improved educational arrangements as described above.  Pupils in the
combined school will have more shared experiences and opportunity
for friendships.  This will enhance their confidence and make the
transition to secondary easier.  Larger year groups make the provision
of specialist services more viable and provide enhanced opportunities
for school trips. Lochnell Primary School meets all the requirements of
the Equality Act 2010. 
15 Assessment of likely educational benefits on the pupils of any
other schools in the Council area 
15.1 The current mothballing of the school has had an indirect effect on
other pupils in Argyll and Bute.  The reduction in the running costs for
the school means that this is a saving to the Council, which is not taken
from elsewhere. If Achaleven Primary School was to close, the current
mothballing costs being incurred would be re-directed and therefore
indirectly benefit other school pupils in Argyll and Bute. 
15.2 There are no other significant impacts from this proposal on other
pupils in the authority or who attend other schools, in either a positive
or a negative way. 
Placing requests 
15.3 This proposal will not affect the right of parents to request that their
child attend a school of their choice rather than the designated school
in whose catchment area the family lives as provided by the Education
(Scotland) Act 1980. 
16 Consideration of how to minimise or avoid any adverse effects
that may arise from the implementation of this proposal 
16.1 The main adverse effect from this proposal would be the length of the
journey to school for children who live in the Achaleven Primary School
catchment area.  However, children who live in this catchment area and
attend Lochnell Primary School make this journey, and families in the
area engaged with thus far do not feel this is a major consideration.
Funded school transport would also continue to be provided for pupils
should this proposal be implemented.

Page 21

21 
17 Summary of educational benefits statement 
17.1 Educational benefits of this proposal, such as the ability for children to
participate in a broad range of experiences, the development of the
strategic leadership of the head teacher in taking forward
improvements in learning and teaching, and the ability to meet the
educational, social and emotional needs of the children are significant
benefits to this proposal. During the pre-consultation phase, these
benefits were explored in detail and details from the community
engagement and the findings from the preliminary requirements, to
include the alternative proposals and the authority’s assessment of
other likely effects of the proposal and the reasons for that assessment
are attached as Appendix 5 Options Appraisal. 
17.2 Whilst the positive educational benefits are numerous, there is one
negative aspect identified which arises from the children attending
Lochnell Primary School.  This negative aspect is principally around the
fact that children have to travel by either bus or car to school.  However
it is considered that the positive aspects of this proposal outweigh the
negative aspect of some travelling for children. 
18 FACTORS FOR RURAL SCHOOL CLOSURES 
18.1 The Council has had special regard to the following factors in relation
to this proposal, as Achaleven Primary School is classified as a remote
rural school: 
The likely effect on the local community if this proposal is 
implemented 
18.2 The Council has made an assessment on the sustainability of the
community should this proposal be implemented and considers that
this may have a positive impact. 
18.3 The Scottish Government focuses on four key areas of importance to
rural communities; 
 a strong and diverse rural economy, harnessing traditional
strengths and with an appetite for change,
 thriving rural communities where everyone can enjoy a decent
quality of life, where the young are not forced to leave their
communities to get on and where the vulnerable are no longer
excluded,
 strong, community focused public services that are accessible, of
the highest possible quality and with the greatest possible choice,
 a rural Scotland whose natural and cultural heritage flourishes in all
its diversity

Page 22

22 
18.4 In rural communities, the challenges and opportunities are largely
defined by the local area and can often best be met by a bottom-up,
community-led response. Strong community leadership is vital to
articulating local priorities and driving forward change and growth. 
18.5 There is the potential if this proposal is implemented to capitalise on
the existing will and drive in this community, with opportunities for local
leaders to enable them to organise, motivate and inspire their
neighbours. The opportunity for the local community to acquire this
building would have a positive impact on the sustainability for the
village. 
18.6 Research1 has shown that when communities feel empowered, there
is: 
 greater participation in local democracy;
 increased confidence and skills among local people;
 more people volunteering in their communities; and
 greater satisfaction with quality of life in the neighbourhood. 
18.7 The majority of people who attended the preliminary engagement event
stated that they would be in favour of preliminary work to investigate
whether the school building could be retained for community use and
not allowed to fall into further disrepair, as that would adversely impact
on the visual impact of the village. 
18.8 It is considered that formal closure of this school could have a positive
impact on the wider community, and might have potential to lead to an
increase in other users of the facility, which may lead to an
improvement in economic growth. 
18.9 Indeed, the school closure may help to empower the local community
should the community wish to undertake an asset transfer process for
the building. This could have a positive impact on community
sustainability. Formal closure would mean that these plans could
potentially be progressed by the community, some of whom are already
contemplating ideas for future uses for the building. This may enhance
community life by giving a community enterprise focus. 
On the availability of the school’s premises and its other facilities
for use by the community 
18.10 During the pre-consultation phase, almost all members of the
community supported closure of the school with the suggestion that the
building and adjoining grounds could potentially be retained for
community use. As previously stated, Connel Village Hall is situated                                                 
1 https://www.gov.scot/policies/community-empowerment/

Page 23

23 
approximately 300 yards from Achaleven Primary School and is used
for village events. All people who attended the pre-consultation meeting
felt that the school building should be retained for community use and
not allowed to fall in to further disrepair, as that would adversely impact
on the aesthetic of the community. 
18.11 It is accepted that a school closure may have an adverse effect on a
community, but a community hub could be an asset to the community.
If any of the local community’s plans for the building were to progress,
this could have a positive impact on the sustainability of the community
and in particular the availability of the school’s premises and other
facilities for use by the community. Formal closure of the school would
mean that these plans could potentially be progressed by the
community.   
The likely effect caused by any different travelling arrangements 
18.12 The travel distance from Achaleven Primary to Lochnell Primary is 3.6
miles via the A85 and the A828. Travel time is approximately 8
minutes. Travel arrangements have been in place for 2 years since the
school was mothballed. Travel is an accepted aspect of living in the
Achaleven community. 
18.13 Implementation of the proposal would have no effect on the current
travel arrangements of staff and pupils. The closure of Achaleven
Primary School, in terms of current travel arrangements would have a
neutral effect. There is no current annual transport cost for pupils to
travel to Lochnell Primary School as it is part of an existing West Coast
Motors service bus route, and therefore would not incur additional costs
in the immediate future. 
18.14 It is anticipated that the effect on the travel arrangements of staff and
other users of the facility would not differ materially from that of the
pupils. 
Environmental impact 
18.15 Currently pupils travel to Lochnell Primary School from the Achaleven
Primary School catchment area, and there is a pre-existing West Coast
Motors service bus. Therefore, implementation of the proposal would
have a neutral environmental impact on the current position, and would
have no environmental impact on the current travel arrangements for
staff. 
18.6 If this proposal was to be implemented there would be little or no
further impact on the natural environment.

Page 24

24 
19 FINANCIAL IMPACT 
19.1 The full breakdown of the financial analysis is detailed in Appendix 4.
This information gives details on the estimated cost if Achaleven
Primary School was still to be an occupied and operational
establishment. However, as Achaleven Primary School is currently
mothballed, the cost for the mothballing is now estimated to be £15,866
per year. Should the school be reopened, occupied and operational,
the running costs per year are estimated at £165,867 with the cost to
bring the property to an acceptable standard to re-open the school is
£25,465. These latter two costs have not changed significantly since
the Options Appraisal (Appendix 5) was produced. 
19.2 Column 2 of Table 1 at Appendix 4 shows the projected annual
running costs of Achaleven whilst Column 3 shows the additional
impact on Lochnell Primary as the receiving school.  The annual
recurring savings (or costs) are shown in Column 4. 
19.3 The main elements included within a school budget are teacher
employment costs (i.e. basic salary costs plus related employer’s
National Insurance and Superannuation contributions plus any relevant
individual allowances); Local Government employee costs and an
allocation for discretionary expenditure incurred by the school (i.e.
educational equipment, materials, staff travel, etc.). Teacher staffing
budgets are calculated on an annual basis and within the primary
sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific
number and age of the pupils in each school. When a school ceases to
be operational the teacher staffing budget is adjusted (at the
appropriate time), per entitlement information from Education HR, with
the staffing budget resulting in a nil value. 
19.4 In line with the national priority of maintaining teacher numbers, the
Education Service operates on the basis that supernumerary teachers
are redeployed and therefore their salary costs still exist with an
increase to the receiving school’s budget. Some of the costs noted in
column 3 of Table 1 will not directly impact on Lochnell Primary School
but they will be a cost to the Authority as a whole, for example the
costs of maintaining the teachers employed in Achaleven Primary
School. 
19.5 There are currently no annual transport costs for pupils to attend
Lochnell Primary School. 
19.6 Table 2 contains the notional 30 year lifecycle costs that would arise
based on the GIA of the various schools irrespective of the number of
pupils accommodated. Lifecycle costs are representative of the cost
needed to keep the building in a good state of repair. The cost over the
next thirty years therefore to maintain Achaleven Primary School is
£327,885 and for Lochnell Primary School this is £1,060,969.

Page 25

25 
19.7 Table 3 contains the annual running costs during mothballing of
Achaleven Primary School. This estimate has increased to £15,866 per
year. This includes non-domestic rates, utility costs, insurances, etc. If
the school was to be formally closed, this would allow the Council to
take steps towards selling the school to a third party or local
community. 
19.8 The transfer of pupils from Achaleven to Lochnell Primary School
would impact on the council’s Grant Aided Expenditure (GAE)
allocation for Achaleven Primary School Teaching Staff as there would
be a reduction in the Percentage of Primary Pupils in Small Schools. 
This reduction is estimated at £15,798. However Argyll and Bute
Council is supported through the floor mechanism so would not see a
reduction in their overall funding. 
20 EQUALITY AND SOCIO-ECONOMIC IMPACT 
20.1 The Council as a public authority has a duty under the Equality Act
2010, the Public Sector Equality Duty 2011, the Fairer Scotland Duty
(Part one of the Equality Act) and the Islands (Scotland) Act (2018) to
have due regard to their provisions when making strategic financial
decisions. This is done through assessing the potential impact of the
decision on equality through Equality and Socio-Economic Impact
Assessments (EQSEIAs).  
20.2 The Council will undertake the process of assessment during the
consultation process in respect of this proposal to ensure that due
regard is given to such matters in the decision making process. 
21 CONSULTATION ARRANGEMENTS 
21.1 Prior to formulating a rural school closure proposal under the Schools
(Consultation) (Scotland) Act 2010 (the 2010 Act), as amended, the
Education Authority must satisfy the preliminary requirements set out in
Section 12A of the 2010 Act. The Authority has previously identified its
reasons for formulating a possible proposal, considered whether there
were any reasonable alternatives to the possible proposal as a
response to those reasons,  and assessed each of the options in
accordance with Section 12A(2)(c) of the 2010 Act. After considering a
paper addressing these preliminary requirements, the Education
Authority decided on 9th March 2023 that, having specific regard to the
reasons for formulating a prospective closure proposal, the option to
close Achaleven Primary School and redraw its catchment area to
Lochnell Primary School is the most appropriate response to the
specific reasons for the potential proposal. 
21.2 This document was considered by the Council as Education Authority
on 24th August 2023 when it was agreed that it should be adopted as a

Page 26

26 
relevant proposal and issued as a basis for consultation.  No decision
will be taken by the Council on the proposal contained in this paper
until after the end of the consultation period. The Council will then
receive a report on the consultation and will reach a view on the
proposal. 
21.3 A summary of this document will be issued free of charge to all of the
consultees listed on page 2 of this document and it will also be
published on the Council’s website:   
https://www.argyll-bute.gov.uk/school-consultations-and-
proposals 
21.4 As part of a consultation process, the Education Authority must publish
the proposal paper, advertise it and notify Education Scotland and all of
the relevant consultees as prescribed by Schedule 2 of the 2010 Act,
inviting them to make representations on the proposal. The
consultation period will be from 31st August 2023 until the close of
business on 27th October 2023 which lasts for a minimum of 6 weeks
and includes at least 30 school days. 
21.5 A public meeting will be held at Achaleven Primary School on
Wednesday 4th October 2023 at 6.00pm. Anyone wishing to attend the
meeting and participate is welcome to do so. The meeting will be
convened by the Education Authority and the Education Authority will
present reasons for bringing forward the proposal. There will be an
opportunity for questions to be asked and comments to be made. A
note will be taken so that comments can later be summarised and
considered. However, the Education Authority will also consider written
responses which should be sent to Education Services, School
Consultations, Argyll & Bute Council, Argyll House, Dunoon, Argyll,
PA23 8AJ and should be received no later than 5.00pm on 27th
October 2023. 
21.6 Written representations may be made on the proposal and the
alternatives to the proposal. Written representations may also suggest
other alternatives to the proposal. 
21.7 Following the close of the consultation, the Education Authority will
provide Education Scotland with copies of the written representations
submitted, a summary of the oral representations made at the public
meeting and any other relevant documentation. This will allow
Education Scotland to prepare a report on the proposal within a period
of 3 weeks. 
21.8 After receiving Education Scotland’s report, the Education Authority will
then prepare and publish a Consultation Report in accordance with
Sections 9, 10 and 13 of the 2010 Act. The Education Authority will
thereafter make its final decision on whether to implement the proposal.
The decision will be made a minimum of 3 weeks after publication of

Page 27

27 
the Consultation Report. If the Education Authority makes a closure
decision, it shall notify the Scottish Ministers within 6 working days of
that decision and publish the fact that the Scottish Ministers have been
notified, and that representations can be made to them. The Education
Authority would also be required to publish a notice on its website of
the decision to implement the proposal and why it has been satisfied
that closure is the most appropriate response to the reasons for
formulating the proposal. 
21.9 The Scottish Ministers will have a maximum of 8 weeks to call in any
closure decision made by the Education Authority in certain
circumstances. This 8 week timeframe would consist of an initial 3
weeks from the date of decision, during which representations can be
made to the ministers, and a further 5 weeks for the Scottish Ministers
to decide whether to issue a call in notice. During this period the
Education Authority will not proceed to implement any closure decision. 
21.10 If the Scottish Ministers call in a closure proposal, it is referred to the
Convener of the School Closure Review Panels. The Convener must
constitute a School Closure Review Panel within 7 days for
determination. The Education Authority may not implement a closure
decision in whole or in part until the Panel has made its determination.
It will usually issue a decision within 8 weeks of the Panel being
constituted. 
21.11 If the School Closure Review Panel refuses to consent to the closure
decision, or following publication of the Consultation Report the
Education Authority decides not to implement the closure proposal, the
Education Authority cannot publish a further closure proposal in relation
to the school for 5 years, unless there is a significant change in the
school’s circumstances. 
22 CONCLUSION 
22.1 It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochnell Primary School shall be extended to include the current
catchment area of Achaleven Primary School. 
22.2 It has been assessed that the proposal is the most appropriate means
of addressing the underlying reasons for formulating it, which are: 
 Achaleven Primary School has been mothballed for two years.
The school roll is currently zero, and is not predicted to rise
significantly in the near future. 
 Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing
there are 16.29 fte teacher and head teacher vacancies in Argyll
and Bute.

Page 28

28 
 Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance. The annual cost of the
mothballing of the building is currently £15,866. 
Other Considerations 
 The Council needs to allocate its resources in a way that ensures the
quality of all of its services. 
 This proposal will bring educational benefits to all present and future
users of the affected schools and assist in ensuring that the Education
budget is more sustainable into the future; 
 The costs per pupil in under-occupied schools are excessively high; 
 Schools in the Council area are expensive to maintain and operate; 
 Retaining unessecary accomodation is a serious drain on the
resources of the Council and diverts spending from areas that directly
affect the educational attainment of pupils; 
 There is no realistic possibility at present of the Council being able to
bring its whole school estate up to a satisfactory condition. The present
condition is unsistainable and can only be improved by reducing the
extent of the estate. 
DOUGLAS HENDRY
Executive Director with responsibility for Education 
Councillor Yvonne McNeilly
Policy Lead for Education 
For further information, contact:                                                  
Wendy Brownlie 
Head of Education: Performance and Improvement
Wendy.Brownlie@argyll-bute.gov.uk 
Rachel Binnie
Education Manager (Acting)
Rachel.Binnie@argyll-bute.gov.uk 
9th August 2023

Page 29

29 
APPENDICES 
Appendix 1 -  Consultation Letter
Appendix 2 -  Response form
Appendix 3 -  Maps
Appendix 4 -  Financial template
Appendix 5 -  Options Appraisal

Page 30

30 
Argyll and Bute Council 
Comhairle Earra Ghàidheal agus Bhòid 
Executive Director: Douglas Hendry 
Kilmory, Lochgilphead, Argyll, PA318RT
Telephone: 01631 700045 Fax:  
Our Ref:  Ref:
e-mail: Rachel.Binnie@argyll-
bute.gov.uk
Council Website:  www.argyll-bute.gov.uk 
Achaleven Primary School 
Dear Consultee, 
Review of Education Provision
Notice and Summary of Proposal for closing Achaleven Primary School
Schools Consultation (Scotland) Act 2010                             
Background 
Argyll and Bute Council, through its Education Service, aims to realise
ambition, excellence and equity for all.   
The Council is consulting on a proposal to close Achaleven Primary School.
This notice provides a summary of a proposal that you may have an interest
in or are required to be notified of, giving you key information about the
proposal. 
The Council is conducting a public consultation process. This will commence
on 31st August 2023 and will conclude on 27th October 2023. This is the
period within which you will be able to make written representations to the
Council in respect of the proposal.  If you wish your view to be taken account
of in the consultation exercise you must submit your written representation
within this period. This notice and summary provides further information on
where a full copy of the proposal may be obtained or referenced and also
advises on how you can make written representations to the Council. 
The Council will hold a meeting where officers will be able to provide
information on the proposal.  The details of the public meeting are contained
in this notice and summary. 
It is important that everyone we are consulting tells us what they think of the
proposal. Please read this notice and summary and then consider the
contents of the proposal document. You can then tell us what you think of the
APPENDIX 1

Page 31

31 
proposal by making written representation and/or by attending the public
meeting. This notice and summary tell you how to do that. 
The Proposal 
It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. The catchment area of Lochnell
Primary School shall be extended to include the current catchment area of
Achaleven Primary School. 
Reasons for this proposal 
This is considered to be the best option to address the reasons for the
proposals which are; 
 Achaleven Primary School has been mothballed for two years. The
school roll is currently zero, and is not predicted to rise significantly
in the near future. 
 Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there
are 16.29 fte teacher and head teacher vacancies in Argyll and
Bute. 
 Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance. 
The Council’s education strategy - Our Children Their Future 
Together we will realise ambition, excellence and equality for all. 
 Raise educational attainment and achievement for all,
 Use performance information to secure improvement for children and
young people,
 Ensure children have the best start in life and are ready to succeed,
 Equip young people to secure and sustain positive destinations and
achieve success in life,
 Ensure high quality partnership working and community engagement,
 Strengthen leadership at all levels. 
Alternatives to the Proposal 
The following alternatives to the proposal were considered at the preliminary
pre-consultation stage of this process; 
a) Re-open Achaleven Primary School,
b) Continued Mothballing of Achaleven Primary with the pupils zoned to
either Lochnell or Dunbeg Primary Schools,
c) Close Achaleven Primary School and realign its catchment area to
Dunbeg Primary School,

Page 32

32 
d) Close Achaleven Primary School and realign its catchment area to
Lochnell Primary School, (the Proposal). 
Written representations may be made on those alternatives as well as on the
proposal. 
Written representations on the proposal may suggest other alternatives to the
proposal. 
What will we do? 
We will consult with people by: 
 Providing a notice of the consultation and a summary of the proposal to
the relevant consultees this is that notice and summary
 Placing an advert in the local press
 Putting information on our website https://www.argyll-
bute.gov.uk/school-consultations-and-proposals
 Holding a public meeting to explain the proposal
 Ask parents, carers, children, young people, teachers, support staff
and others to tell us what they think of the proposals. 
What to do now? 
 Please read the full proposal document
 Please attend the Public Meeting which will be held on Wednesday 4th
October 2023 at 6.00pm in Achaleven Primary School. 
 Let us know what you think by:
Letter to: Education Services  
School Consultations  
Argyll & Bute Council  
Argyll House  
Alexandra Parade  
Dunoon      
PA23 8AJ 
Returning the attached response sheet by post or by; 
Email to:  argyllhousereception@argyll-bute.gov.uk                     
What next? 
Whilst the Council is engaging in a consultation process in relation to this
proposal that does not mean that the proposal will go ahead. It does mean
that the Council is engaging in a consultation process to seek your views on
the proposal. 
All the points raised during the consultation will be carefully considered and
Elected Members will then decide if the plan should go ahead.

Page 33

33 
If the suggestion goes ahead, any children from Achaleven Primary School
catchment area would be educated at Lochnell Primary School. Children
already attending Dunbeg Primary School would be able to continue at this
school. 
Please note that this summary document is for convenience only.  Full details
of the consultation can be obtained from: 
 Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
 Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
 Lochnell Primary School, Benderloch, Oban, Argyll, PA37 1QS
 Dunbeg Primary School, Dunbeg, Argyll, PA37 1QF
 Connel Village Hall, Lora Rd, Connel, Argyll PA37 1PA
 Oban Library, 77 Albany Street, Oban PA34 5AL 
It is also available electronically via our website:
 https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
Yours faithfully, 
Douglas Hendry
Executive Director with responsibility for Education

Page 34

34 
APPENDIX 2 
Argyll and Bute Council
Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access restricted
to Elected Members and Council Officers of Argyll and Bute Council. 
Proposal 
It is proposed that:
Education provision at Achaleven Primary School be discontinued with effect from 31st May
2024. The catchment area of Lochnell Primary School shall be extended to include the current
catchment area of Achaleven Primary School. 
This part of the form must be completed for a valid response:
Name: (please print) Address: 
Post Code:
I agree/do not agree (delete which does not apply) that my response can be made publicly
available
Signature: Date: 
YOUR INTEREST: (please tick) 
Parent 
Child / 
Young Person  Staff            Other  * 
Elected Member / MSP / MP    Member of Community Council 
*Other: (please specify) 
Please state your views on the proposal (continue overleaf if necessary)

Page 35

35 
APPENDIX 3 - MAPS 
MAP OF CURRENT PRIMARY SCHOOL CATCHMENT AREA 
The Map below shows the adjoining catchment areas of Achaleven and Lochnell
and Dunbeg Primary Schools: 
A – Achalaven Primary School
B- Lochnell Primary School
C – Dunbeg   Primary School 
B
A
C

Page 36

36 
APPENDIX 4 – FINANCIAL TEMPLATE 
Table 12 
Name of School
Achaleven Primary
Projected
annual costs
for full
financial
year 2023/24
Additional
financial
impact on
receiving
school 
Lochnell 
Primary
School 
Annual
recurring
savings
(column 2
minus
column 3)
School costs      
Employee costs -       
teaching staff 106,927  106,927
support staff 23,355  23,355
teaching staff training (CPD etc.)   0
support staff training   0
Supply costs  3,030  3,030     
Building costs:   
property insurance 1,948  1,948
non domestic rates 605  605
water & sewerage charges 142  142
energy costs 13,478  13,478
cleaning (contract or in-house) 549  549
building repair & maintenance 2,650  2,650
grounds maintenance 211  211
facilities management costs  0  0
revenue costs arising from capital   0
other - refuse collection; telephones 1,480  1,480        
School operational costs:      
learning materials 2,911 44 2,867
catering (contract or in-house) 9.055 361 8,694
SQA costs   0
other school operational costs (e.g.
licences) 544  544     
Transport costs:    
home to school    0
other pupil transport costs 0 0 0                                                 
2 These figures have been calculated based on Achaleven Primary school roll the last full year prior to
mothballing.

Page 37

37 
staff travel    0
SCHOOL COSTS SUB-TOTAL 166,884 405 166,479 
Income:      
Sale of meals -1,017 -291 -726
Lets   0
External care provider   0
Other     0
SCHOOL INCOME SUB-TOTAL -1,017 -291 -726     
TOTAL COSTS MINUS INCOME
FOR SCHOOL 165,868 114 165,754 
UNIT COST PER PUPIL PER
YEAR 23,695 14 20,719 
Table 2 
Capital costs
School
proposed for
closure 
Achaleven
Primary
Receiving
school 
Lochnell 
Primary
Capital Life Cycle cost  352,885 1,060,969
Third party contributions to capital costs   
Table 3 
Annual Property costs incurred (moth-balling) until disposal
property insurance   1,948
non domestic rates   605
water & sewerage charges   142
energy costs   7,412
cleaning (contract or in-house)   0
security costs   0
building repair & maintenance   1,950
grounds maintenance   211
facilities management costs 3,422
other 177
TOTAL ANNUAL COST UNTIL DISPOSAL 15,866

Page 38

38 
Table 4 
Non-recurring revenue costs 
£3,800 
TOTAL NON-RECURRING REVENUE COSTS   
Table 5 
Impact on GAE - note 5  
The Primary Indicator determining the GAE allocation for Primary
School Teaching Staff is based on the number of primary school
pupils with the Secondary Indicator being the percentage of pupils in
small schools (roll < 70 pupils averaged over 2 years).  The additional
pupils from Achaleven will maintain the rolls of both Dunbeg and
Lochnell above the small school threshold.  There will be a loss of
small school GAE for those pupils attending Achaleven equating to
approximately £16k. 
Argyll and Bute Council, however, is supported by the floor
mechanism therefore any calculated reduction in GAE would not
have an actual impact on the overall GAE allocation.
15,798
GAE IMPACT 15,798