ERRATUM NOTICE (Revised Item 7 - Proposal Paper and Launch of Statutory Consultation - Former Riverside ELCC)

West Dunbartonshire Council · 28 September 2022
Back to Educational Services Committee — 28 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Erratum Notice 
Educational Services Committee 
Date:  Wednesday, 28 September 2022
___________________________________________________________________ 
Time:  10:00
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:    Scott Kelly, Committee Officer  
Tel: 01389 737220.  Email: scott.kelly@west-dunbarton.gov.uk 
Dear Member 
ERRATUM 
I refer to the papers for the above Meeting of the Educational Services Committee
which were issued on 14 September 2022 and enclose revised versions of the report
and appendix relating to Item 7, ‘Proposal Paper and Launch of Statutory
Consultation for the Establishment of a New School to Support Additional
Support Needs at the Former Riverside Early Learning and Childcare Centre’.
These supersede pages 11 to 24 of the original papers issued for the meeting.  The
revised report had been amended at paragraph 4.1.7 (page 13) and the revised
appendix has been amended at paragraph 7.2 (page 21).   
I apologise for any inconvenience caused.   
Yours faithfully 
PETER HESSETT 
Chief Executive

Page 2

Distribution: 
Councillor Clare Steel (Chair)   Councillor Gordon Scanlan
Councillor Karen Conaghan    Councillor Hazel Sorrell
Councillor Gurpreet Singh Johal   Mrs Barbara Barnes
Councillor Daniel Lennie    Miss Jessica Boyle MSYP
Councillor David McBride    Mr Gavin Corrigan
Councillor Jonathan McColl   Miss Ellen McBride
Councillor Michelle McGinty (Vice Chair)  Ms Hannah Redford 
Councillor June McKay    Ms Julia Strang
Councillor John Millar    Miss Tian Qi Yu MSYP
Councillor Lawrence O’Neill   Vacancies x2
Councillor Lauren Oxley   
Councillor Martin Rooney 
All other Councillors for information 
Chief Education Officer 
Date of Issue: 20 September 2022

Page 3

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Education Officer
Educational Services Committee: 28th September 2022
___________________________________________________________________
Subject: Proposal Paper and launch of statutory consultation for the
establishment of a new school to support additional support
needs at former Riverside Early Learning and Childcare Centre.
1. Purpose
1.1 The purpose of this report is to seek Committee’s approval for the launch of
the statutory consultation document by the Chief Education Officer under the
terms of the Schools (Consultation) (Scotland) Act 2010 on the proposal to
open a new additional support needs school in the site of  the former
Riverside ELC on the St Martin’s Primary School site.
2. Recommendations
2.1 It is recommended that Committee:
a) approves the launch of the statutory consultation document by the
Chief Education Officer under the terms of the Schools (Consultation)
(Scotland) Act 2010 on the proposal to establish a new additional
support needs school to be located in the former Riverside ELC site
within the campus of the current St Martin’s Primary School and;
b) agrees that the consultation period should run from Monday 3rd October
2022  to Friday 11th November 2022, a total of 33 days when the
schools are open for pupils and reflecting the October holiday week
and;
c) agrees that a report outlining the results of the consultation and making
appropriate recommendations be presented to the meeting of the
Educational Services Committee provisionally scheduled to be held on
16th  March 2023.
3. Background
3.1 On 16th March 2022, Council approved the expansion of the school learning
estate to meet projected needs of the Additional Support Needs (ASN) sector.
3.2 On 16th March 2022, the Educational Services Committee:
a) Agreed the suggested phases of development and associated capital
works and;
ITEM 7
(revised version)
Page 11

Page 4

b) Agreed that a report outlining the results of the consultation and making
appropriate recommendations be presented to a future meeting of the
Educational Services Committee and; 
c) Agreed to allocate funding from the unallocated school improvement
capital plan and; 
d) Noted the progress of the work of the ASN Strategy and identified
growth needs. 
4. Main Issues 
4.1 Because this proposal, if enacted, would involve the opening of a new school,
the Council is required to carry out a consultation process as detailed in the
Schools (Consultation) (Scotland) Act 2010. 
4.1.1 The 2010 Act requires the education authority to publish a “proposal paper”
which sets out the details of the relevant proposal. The Proposal Paper for
this project is provided as Appendix 1 to this report. 
4.1.2 The 2010 Act also requires the education authority to publish an “educational
benefits statement” in relation to any proposal which falls under the terms of
the act. The Educational Benefits Statement in relation to the ASN Estate
proposal is included in section six of the Proposal Paper which forms
Appendix 1 to this report.  
4.1.3 The Act defines the statutory consultees for a proposed school opening. All
these groups will be invited to respond to this consultation, as would the
Archdiocese of Glasgow of the Catholic Church. The proposal question
provided at paragraph 7.17 of Appendix 1 to this report will form the basis of
the written consultation and may be submitted by hand, by post or
electronically to the council. 
4.1.4 The Act requires a consultation period of at least 6 weeks which must include
at least 30 school days. It is proposed that the consultation period for this
project should run from Monday 3rd October 2022  to Friday 11th November
2022, a total of 33 days 
4.1.5 The education authority is required, as part of the consultation process, to
hold public meetings to discuss the relevant proposal. The public meetings for
this proposal will be held on Tuesday 25th October 2022 - online at 4pm, and
in-person at St Martin’s Primary school at 7pm. 
4.1.6 The 2010 Act requires the involvement of Education Scotland in the process.
Education Scotland must be provided with the Proposal Paper, the
Educational Benefits Statement and the submissions made to the education
authority during the consultation period (or, by agreement, a summary of
these submissions). Education Scotland then prepares a report on the
educational aspects of the proposal. 
Page 12

Page 5

4.1.7 The education authority is then required to publish a “Consultation Report”
containing a record of the total number of submissions received, a summary
of those submissions and of any oral representations made during the public
meeting, a copy of the Education Scotland report and a statement of the
authority’s response to the written and oral submissions and to the Education
Scotland report. Providing all necessary procedures can be undertaken in
timescale outlined in section 4.3 below, it is planned to present the
Consultation Report on the ASN learning estate expansion to the meeting of
the Educational Services Committee provisionally scheduled to be held on 8th
March 2023. 
4.2 Work to redevelop the vacated ELC will take place whilst education in the St
Martin’s site continues.  This will be planned to ensure minimal disruption to
the school and facilities at their disposal. Plans will be implemented to ensure
effective communication with all stakeholders, health and safety procedures
and risk assessments. 
5. People Implications 
5.1 If the proposals are accepted, there will be some effect on staffing levels
within the new campus, particularly within cleaning and facilities management
services and as there will be two establishments on the campus to be
supported.  There is potential to create a number of teaching and support staff
posts. At time of writing, this is being developed.  Any changes would be
managed via the Council’s policies for managing such changes. The
timescales involved mean that any additions or recruitment of staff will be
managed in a planned way. 
6. Financial Implications 
6.1 There are no associated costs for undertaking the statutory consultation. Time
to complete the activities would be covered by central officers. 
7. Risk Analysis 
7.1 Failure to continue to expand the ASN learning estate would lead to increased
inequalities for young people and reputational damage for the Council. 
7.2 The risks of failing to complete the project on time and within budget will be
controlled via robust project management based on the Council’s substantial
and successful recent experience in delivering schools projects. 
8. Equalities Impact Assessment (EIA) 
8.1 An Equalities Impact Assessment has been undertaken for this proposal
(Appendix 2).This project will improve the quality of educational experience for
young people in West Dunbartonshire who have severe and complex learning
needs and there are therefore no negative impacts relating to equality issues.  
9. Consultation 
Page 13

Page 6

9.1 This project has been the subject of extensive discussion by the Strategic
Asset Management Group and the Corporate Management Team as well as
by Council and the Educational Services Committee. 
9.2 Legal Services and the Section 95 Officer have been consulted on the content
of this report. 
9.3 As detailed in section 4.2 of this report and in appendix 1, consultation with all
statutory consultees will be conducted on the proposals in this report in
accordance with the requirements of the Schools (Consultation) (Scotland)
Act 2010. 
10. Strategic Assessment 
10.1 The improvements in the learning environments in the adaptation of the
former ELC promotes and encourages imaginative and innovative learning
and teaching thereby increasing attainment and achievement. This in turn
leads to the strategic objective of a strong local economy and increased
employment opportunities. 
________________________
Laura Mason
Chief Education Officer
Date: 10/8/22 2022 
Person to Contact: Claire Cusick  
Senior Education Officer  
Email: claire.cusick@west-dunbarton.gov.uk   
Appendices: Appendix 1: Proposal Paper, incorporating Educational
Benefits Statement 
Background Papers: Educational Services Committee Report 16th March 2022 
Expansion of the School Learning Estate.  
Schools (Consultation) (Scotland) Act 2010 
Wards Affected: All wards 
Page 14

Page 7

West Dunbartonshire Council
Educational, Learning & Attainment
A Proposal Document 
For
Additional Support Needs (ASN) School within the former Riverside ELCC
in the Vale of Leven area.
The following Schools and Early Learning and Childcare Centres are
affected by this Proposal Document:
Former Riverside ELCC premises and St Martin’s Primary School.
This document has been issued by West Dunbartonshire Council for
consultation in terms of the Schools (Consultation) (Scotland) Act 2010
Appendix 1
(revised version)
Page 15

Page 8

1. Introduction 
1.1 At its meeting on 15th June 2022, the Educational Services Committee of
West Dunbartonshire Council is asked to approve: 
a) the launch of the statutory consultation  the Chief Education Officer
under the terms of the Schools (Consultation) (Scotland) Act 2010
on the proposal to redevelop the former Riverside ELCC to form a
new school supporting ASN needs on the St Martin’s Campus and
to;
b) agree that a report outlining the results of the consultation and
making appropriate recommendations be presented to the meeting
of the Educational Services Committee in March 2023. 
2. The Proposal 
2.1 West Dunbartonshire Council is proposing, subject to approval from
Education Services Committee and the outcome of the consultation
process: 
• To establish a new school providing education for young people
with additional support needs in the former Riverside ELC
premises from August 2024. 
2.2 A map identifying the locations of the affected establishment is included
as Appendix 1. 
3. Background to the Proposal 
3.1 Our Additional Support Needs Strategy has recognised there is a need for
expansion to the ASN Learning Estate to meet projected needs.  This
proposal will support the cohort of pupils due to transition from primary to
secondary education in August 2024. 
3.2 It is anticipated young people who will attend this setting will transition
from their existing primary school  settings to S1 in 2024 when the new
school opens. This negates the need for alternative premises in our
Secondary Estate. 
3.3 The improvements in the learning environments in the new builds and
other educational establishments promotes and encourages imaginative
and innovative learning which will meet the needs of learners thereby
improving outcomes for them. This in turn leads to the strategic objective
of a strong local economy and increased employment opportunities. 
Page 16

Page 9

3.4 West Dunbartonshire has the commitment to ensure all of our children are
educated in buildings that meet ‘Category A or B’ as described by the
Scottish Government. Notwithstanding the vast improvements in the
learning estate, there remains, within the primary school estate,
establishments that over time could find themselves with a condition
rating of C (Poor). The suitability of older educational establishments for a
modern curriculum is also challenging, and therefore it is clear that, for
both educational and financial reasons, it is beneficial for the Council to
consolidate and modernise its learning estate by a process of co-location,
new build and closure. 
3.5 The Learning Estate Project Board and Strategic Asset Management
Team consider a range of options for improving the learning estate,
including: school condition and suitability, roll and occupancy level;
potential for refurbishment; location and potential for amalgamation,
closure or co-location; potential for co-location of school(s) and ELCC;
and availability of suitable or existing sites for new builds, preferably in the
ownership of the Council. The development of the St Martin’s site
supports these objectives. 
3.6 On 16nd March 2022, Council approved funding from the unallocated
School Improvement Capital Plan to support this re-development.  
3.7 On 16th March 2022, the Educational Services Committee: 
a) Noted the projected growth of ASN needs; 
b) Agreed that a report outlining the results of the consultation and
making appropriate recommendations be presented to a future
meeting of the Educational Services Committee. 
c) Agreed suggested phases of development and associated capital
works for the ASN Learning Estate; 
d) Agreed to allocate funding from the unallocated School
Improvement capital plan.   
4 Current Position 
4.1 In line with national trends, it is recognised there is an increasing number of
pupils with a complexity of Additional Support Needs in West Dunbartonshire
Council.  This has previously been addressed with the expansion of our
Primary ASN provision.  However, it is now necessary to expand the
Page 17

Page 10

secondary provision as this cohort moves through primary to secondary
school and to address projected needs until 2027.   
4.2 In August 2022, Riverside ELCC which was situated within the St Martin’s
campus closed. Children and staff moved to the new Renton ELCC.  Since
then the site has been empty and through investigation identified as a
suitable site for the new ASN school required to meet projected needs. 
5 Proposed new Campus 
5.1 Proposed site 
5.1.1 Thee council is proposing  to redevelop the former Riverside ELCC into a
new school for young people with additional support needs. 
5.1.2 The main reasons for the choice of this site are: 
• the site is already within the Council’s ownership;
• the suitable size, ground conditions, topography and the availability of
utility services on the site;
• the site is located next to St Martin’s Primary School and Vale of
Leven Secondary school which will provide opportunities for
community building, collaborative planning and learning. 
5.1.3 The children who will learn in the new school will transition there from their
primary schools when the school opens. Contingency planning will be
considered should there be delay to this. 
5.2 Proposed Facilities 
5.2.1 Facilities will require to accommodate 36 young people and appropriate staff
ratios. 
5.2.2 The draft accommodation schedule for the new campus is currently under
development. However it should be noted that modern purposely designed
educational accommodation is the default position, something we have much
experience of based on current and recent projects. In particular the
education, care and welfare provisions will be planned with the complex
needs of the young people in mind. 
5.2.3 The two schools located on the campus; St Martin’s Primary School and the
new proposed ASN school, will operate as separate establishments, with
their own teaching and support staff. Discussions with the Archdiocese of
Glasgow will ensure that the plans for the co-location of the two schools are
Page 18

Page 11

in accordance with the Catholic Church’s protocols for co-located
establishments. 
6 Educational Benefits Statement 
6.1 Introduction 
6.1.1 West Dunbartonshire Council believes this proposal will provide a range of 
educational benefits and enhance the Council’s efforts to meet statutory
obligations enshrined in:
• the Education (Scotland) Act 1980;
• the Standards in Scotland’s Schools etc. Act 2000;
• the Local Government in Scotland Act 2003;
• the Education (Additional Support for Learning) (Scotland) Act 2004;
• the Educational (Additional Support for Learning) (Scotland) Act 2009;
• the Equality Act 2010; 
• Early Learning and Childcare Statutory Guidance and Care Commission
requirements; and
• the Children and Young People (Scotland) Act 2014. 
6.1.2 The proposal is aligned to the UN Convention on the Rights of the Child
which affirms that every child regardless of race, gender or disability has a
right to an education and to develop his or her fullest possible potential. 
6.1.3 The re-development will provide modern, fit-for-purpose educational facilities
which are specifically designed to create a stimulating and supportive
learning environment. 
6.1.4 The new school will be designed to provide a fully accessible and inclusive
environment to accommodate the needs of all users of the building. It will be
designed to fully meet the principles of inclusion whilst supporting the
complex needs of the young people. 
6.1.5 The facilities will support the delivery of Curriculum for Excellence by
providing an environment conducive to nurturing successful, confident and
responsible young people who are able to learn and apply their learning in
ways that will help them to reach their full potential and respond to the variety
and pace of change they will encounter in today’s and tomorrow’s world. The
facilities will be constructed in accordance with the latest building standards
and regulatory requirements relating to building design, providing a variety of
accommodation to deliver experiences across all eight curriculum areas. 
6.2 Likely effect of proposal on pupils who will attend the new school 
6.2.1 There are a number of educational benefits associated with the design of the
Page 19

Page 12

new ASN school: 
• Modern, dedicated and multi-purpose spaces, designed to deliver all
areas of Curriculum for Excellence and to encourage innovative and
flexible teaching and effective learning;
• education in a comfortable, environmentally efficient, wind- and water-
tight environment in which the use of natural light is maximised;
• access to enhanced internal and external facilities;
• well planned internal spaces which are planned to support the complex
needs of the young people who will be using them; 
• use of well-designed social and circulation spaces within the building;
• use of modern toilets and washing facilities;
• an integrated ICT infrastructure, including wireless capability, designed to
maximise the use of the latest technology to enhance learning;
• specially designed general purpose areas, designed to encourage
independent and collaborative learning;
• provision of furniture that is ergonomically designed, age appropriate and
provides flexibility to change configuration and support a variety of  learning
and teaching approaches;  
• a range of the most modern and appropriate facilities for the education,
support and care needs of the children;
• attractive indoor dining facilities, serviced by a modern catering kitchen;
• management, office and staff facilities, suitably located in order  to
support staff in delivering the curriculum and facilitate a positive school
ethos and collegiate working culture;
• integrated infrastructure and storage space, designed to ensure that the
functional areas of the school are not compromised and are fully available
and accessible for learning and teaching purposes;  
• dedicated resource base space incorporating reprographics equipment
and other facilities for use by teaching and support staff to support the
production of pupil resources;
• a safe and secure campus.   
Young people attending the new school will benefit from all of the above
features, and as a consequence, their learning and social experience of
school and integrated community spaces will greatly improve. 
6.3     Likely effect of Proposal on Other Users of the Schools 
6.3.1 As part of West Dunbartonshire Council’s efficiency measures, the Council
has greatly reduced the number of external lets in primary schools, instead
concentrating lets in secondary schools which are generally already open in
the evenings. Currently, there are no sessional lets in the schools affected. 
Page 20

Page 13

6.4 Likely effect of Proposal on other pupils across West Dunbartonshire
schools 
6.4.1 The proposal will result in the ability to meet the needs of more young people
with additional support needs across West Dunbartonshire. It is anticipated
these allocations will be managed through existing allocation processes. 
6.4.2 The enhanced facilities will enable the Council  to meet the needs of pupils
within the Authority. It will support transition processes for pupils moving from
one additional support needs setting to another. 
7.0 The Consultation Process 
7.1 At its meeting on 16th March 2022, West Dunbartonshire Council authorised
the Chief Education Officer to prepare for formal consultation in terms of the
Schools (Consultation) (Scotland) Act 2010 in relation to the Proposal
specified in section 2 above and the arrangements noted below have been
made to discharge that instruction. 
7.2    The initial aspects of the consultation process are specified in the following table: 
Launch of Statutory Consultation Process  3 Oct 2022
Public Meetings      25th Oct 2022
End of Statutory Consultation Process   25th Oct 2022
Compilation and issue of Section 8 (1) 
Information to Education Scotland   18-26 Nov 2022
Education Scotland response period   29 Nov – 21 Dec 2022
Consultation Report published   14 Feb 2023
Outcome of Consultation at committee  8 Mar 2023 
7.3      The Proposal Document will be issued by the Chief Education Officer to the
consultees included in the following list: 
• Education Scotland;
• The Archdiocese of Glasgow of the Roman Catholic Church;
• the Parent Councils of St Martin’s Primary School and Vale of Leven
Academy  due to their adjacency to the proposed new school; 
• the parents/carers of any children expected by West Dunbartonshire
Council to attend the new schools within two years of the date of
publication of this Proposal Document (with that date of publication
being defined in the table included in section 7.2 above); 
• the teaching and support staff at St Martin’s Primary School; 
• user groups or individuals who currently utilise the facilities at St
Martin’s Primary School;  
Page 21

Page 14

• the constituency MSP; 
• the constituency MP; and 
• Neighbouring local authorities. 
7.4    The Proposal Document will also be published on the West Dunbartonshire
Council website and copies will also be available from the reception point at
the following West Dunbartonshire Council buildings: 
• St Martin’s Primary School, Place of Bonhill, Renton, Alexandria G82
4QB
• Alexandria Library, Gilmour Street, Alexandria G83 0DA
• West Dunbartonshire Council, 16 Church Street, Dumbarton G82 1QL  
7.5     The Proposal Document can also be made available in alternative formats or
in translated form for readers whose first language is not English. Please
make contact with West Dunbartonshire Council’s Educational Services, 16
Church Street, Dumbarton G82 1QL, and Tel: 01389737391 or e-mail:
educationconsultation@west-dunbarton.gov.uk 
7.6  A public notice to advertise the consultation will be placed in the Dumbarton
Reporter and Clydebank Post and the same notice will be displayed on the
reception area notice boards in the above noted West Dunbartonshire
Council buildings. 
7.7      Two public meetings will be held on Tuesday 25th October 2022; one online
at 4pm and one in-person at St Martin’s Primary School at 7pm, at which
representatives of West Dunbartonshire Council’s Educational Services
Department will be in attendance to present the details of the Proposal,
answer questions and record comments/representations from those in
attendance at the meeting. Education Scotland will also attend the public
meetings. 
7.8      Comments/representations may also be made by contacting 01389 737391;
by email to   educationconsultation@west-dunbarton.gov.uk 
or by writing to the Chief Education Officer at West Dunbartonshire Council,
16 Church Street, Dumbarton G82 1QL. Comments/representations should
be received no later than 11th November 2022. 
7.9  At the end of the consultation period, the Chief Education Officer will submit a
copy of all written comments/representations, together with oral
comments/representations made at the public meeting, to Education
Scotland who will prepare a professional and independent report on the
educational aspects of the Proposal. 
7.10  The Chief Education Officer will consider all written and oral
comments/representations received in relation to the Proposal which have
Page 22

Page 15

been received during the consultation period, together with Education
Scotland’s report, and prepare a Consultation Report. 
7.11  The Chief Education Officer shall publish the Consultation Report which shall
be issued (either in full or as a summary document) to the consultees
specified in section 7.3 above; be made available on Council’s website; be
available in printed format from the reception points at West Dunbartonshire
Council buildings specified in section 7.4 above; and be issued to all those
who responded and provided contact details through the consultation
process. 
7.12    The Consultation Report shall be published to allow a period of no less than
3 weeks prior to the Council’s Decision to either implement or reject the
Proposal.    
7.13   The Chief Education Officer shall immediately notify Scottish Ministers if the
Council’s Decision is to implement the Proposal which would redevelop the
former Riverside ELC to open a new school to support young people with
additional needs of young people.  
7.17 The proposal question is as follows: 
Are you in favour of the proposal to redevelop the former Riverside ELCC for
use as a school for young people with additional support needs? Yes / No 
Consultees may also wish to provide reasons for their opinions. 