Page 1

Agenda
Educational Services Committee
Date:  Wednesday, 28 September 2022
___________________________________________________________________
Time:  10:00
___________________________________________________________________
Format:  Hybrid Meeting
___________________________________________________________________
Contact:  Scott Kelly, Committee Officer
Tel: 01389 737220.  Email: scott.kelly@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Educational Services Committee as detailed
above.  
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton.
The business is shown on the attached agenda. 
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution: 
Councillor Clare Steel (Chair)   Councillor Gordon Scanlan
Councillor Karen Conaghan    Councillor Hazel Sorrell
Councillor Gurpreet Singh Johal   Mrs Barbara Barnes
Councillor Daniel Lennie    Miss Jessica Boyle MSYP
Councillor David McBride    Mr Gavin Corrigan
Councillor Jonathan McColl   Miss Ellen McBride
Councillor Michelle McGinty (Vice Chair)  Ms Hannah Redford 
Councillor June McKay    Ms Julia Strang
Councillor John Millar    Miss Tian Qi Yu MSYP
Councillor Lawrence O’Neill   Vacancies x2
Councillor Lauren Oxley   
Councillor Martin Rooney 
All other Councillors for information 
Chief Education Officer 
Date of Issue: 14 September 2022 
Audio Streaming 
Please note: the sound from this meeting may be recorded for live and subsequent
audio streaming via the Council’s internet site.  At the start of the meeting, the Chair
will confirm if all or part of the meeting is being audio streamed. 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including, but
not limited to, for the purpose of keeping historical records and making those records
available via the Council’s internet site. 
If you have any queries regarding this and, in particular, if you believe that use and/or
storage of any particular information would cause, or be likely to cause, substantial
damage or distress to any individual, please contact the Chief Officer – Regulatory and
Regeneration on 01389 737800. 
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/ 
Page 2

Page 3

EDUCATIONAL SERVICES COMMITTEE 
WEDNESDAY, 28 SEPTEMBER 2022 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING 
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
4 RECORDING OF VOTES 
The Committee is asked to agree that all votes taken during the meeting will
be carried out by roll call vote to ensure an accurate record. 
5 MINUTES OF PREVIOUS MEETING     7 – 10    
Submit, for approval as a correct record, the Minutes of Meeting of the
Educational Services Committee held on 15 June 2022.   
6 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
7 PROPOSAL PAPER AND LAUNCH OF STATUTORY  11 – 24
CONSULTATION FOR THE ESTABLISHMENT OF A NEW
SCHOOL TO SUPPORT ADDITONAL SUPPORT NEEDS AT
THE FORMER RIVERSIDE EARLY LEARNING AND
CHILDCARE CENTRE 
Submit report by the Chief Education Officer seeking approval for the launch of
the statutory consultation document by the Chief Education Officer under the
terms of the Schools (Consultation) (Scotland) Act 2010 on the proposal to
open a new additional support needs school in the site of the former Riverside
ELC on the St Martin’s Primary School site.
Page 3

Page 4

8 STRATEGY TO RAISE ATTAINMENT AND ACHIEVEMENT  25 – 40
IN WEST DUNBARTONSHIRE                   
Submit report by the Chief Education Officer providing an update on progress
with implementing Educational Services’ improvement priorities for attainment
and equity. 
9 SCOTTISH QUALIFICATIONS AUTHORITY (SQA)
ATTAINMENT UPDATE 
Officers will provide a verbal update in relation to the Scottish Qualifications
Authority (SQA) Attainment Update. 
10 EARLY LEARNING AND CHILDCARE PROGRESS UPDATE 41 – 47   
Submit report by the Chief Education Officer providing an update on progress
made to provide high quality Early Learning and Childcare in West
Dunbartonshire Council. 
11 INCREASE SUSTAINABLE RATE PAID TO FUNDED EARLY 49 – 53 
LEARNING AND CHILDCARE PROVIDERS 
Submit report by the Chief Education Officer proposing an increase in the
hourly rate paid by West Dunbartonshire Council to contracted private
providers for funded Early Learning and Childcare (ELC). 
12 LITERACY AND NUMERACY – BENCHMARKING   55 – 64 
Submit report by the Chief Education Officer advising on the attainment
progress and performance of the Strategy to Raise Attainment and
Achievement in West Dunbartonshire at Early Years, P1, P4, P7 and S3 in
academic session 2021/2022. 
13 SUMMER HOLIDAY 2022 PROGRAMME EVALUATION  65 – 82 
Submit report by the Chief Education Officer informing and updating on the
additional Scottish Government funding allocations, the governance of funding
and impact of projects. 
14/ 
Page 4

Page 5

14 EDUCATION DELIVERY PLAN 2021/22 YEAR-END   83 – 96
PROGRESS 
Submit report by the Chief Education Officer providing the year-end progress
of the 2021/22 Delivery Plan, which was agreed by the Committee at its
meeting on 9 June 2021. 
15 QUALITY FRAMEWORK LAUNCH     97 – 100 
Submit report by the Chief Education Officer advising on the launch of the
‘Quality Framework’ and outlining the programme of activities relating to
quality assurance. 
16 EDUCATIONAL SERVICES BUDGETARY CONTROL  101 – 119
REPORT TO 31 JULY 2022 (PERIOD 4) 
Submit report by the Chief Officer – Resources providing an update on the
financial performance of Education Services to 31 July 2022 (Period 4). 
Page 5

Page 6

Page 6

Page 7

EDUCATIONAL SERVICES COMMITTEE
At a Hybrid Meeting of the Educational Services Committee held in the Civic Space,
16 Church Street, Dumbarton on Wednesday, 15 June 2022 at 2.00 p.m.
Present: Councillors Karen Conaghan, Gurpreet Singh Johal*, Daniel
Lennie, David McBride, Jonathan McColl, Michelle McGinty,
June McKay, John Millar, Lawrence O’Neill, Martin Rooney,
Gordon Scanlan and Hazel Sorrell, and Mrs Barbara Barnes**,
Mr Gavin Corrigan, Miss Ellen McBride and Ms Julia Strang.
*Arrived later in the meeting.
**Entered the meeting following consideration of the item under
the heading ‘Appointment of Third Religious Representative to
the Educational Services Committee’. 
Attending: Laura Mason, Chief Education Officer; Andrew Brown, Senior
Education Officer – Policy, Performance & Resources; Claire
Cusick, Senior Education Officer – Services for Children &
Young People; Julie McGrogan, Senior Education Officer –
Raising Attainment/Improving Learning; Kathy Morrison, Senior
Education Officer – Early Learning & Childcare; Michelle Lynn,
Assets Co-ordinator; Joe Reilly, Business Unit Finance Partner
(Education); Nigel Ettles, Section Head – Litigation (Legal
Officer); and Scott Kelly, Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Councillors
Lauren Oxley and Clare Steel.
Councillor Michelle McGinty in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor McGinty, Chair, advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
ITEM 5
Page 7

Page 8

RECORDING OF VOTES 
The Committee agreed that all votes taken during the meeting would be carried out
by roll call vote to ensure an accurate record. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
APPOINTMENT OF THIRD RELIGIOUS REPRESENTATIVE TO THE
EDUCATIONAL SERVICES COMMITTEE 
A report was submitted by the Chief Education Officer requesting confirmation of the
reappointment of the third religious representative to the Educational Services
Committee. 
Having heard the Committee Officer in answer to a Member’s question, the
Committee agreed to confirm the reappointment of Mrs Barbara Barnes as the third
religious representative on the Educational Services Committee until the next local
government elections. 
It was noted that Mrs Barnes was in attendance and she joined the meeting as a
Member of the Committee at this point. 
STRATEGY TO RAISE ATTAINMENT AND ACHIEVEMENT IN WEST
DUNBARTONSHIRE 
A report was submitted by the Chief Education Officer providing an update on:- 
(a) changes to the Scottish Attainment Challenge programme; and 
(b) the progress with implementing Educational Services’ improvement priorities 
for attainment and equity. 
After discussion and having heard the Senior Education Officer – Raising
Attainment/Improving Learning and relevant officers in further explanation of the
report and in answer to Members’ questions, the Committee agreed:- 
(1) to note the progress made in the past three months with two key priorities:
The Scottish Attainment Challenge and West Dunbartonshire Council’s
Education Improvement Framework; 
(2) the continuation of aspects of the Covid Education Recovery Plan; and 
(3) to note that regular updated reports would advise of progress. 
Page 8

Page 9

Note: Councillor Johal entered the meeting during consideration of this item. 
EARLY LEARNING AND CHILDCARE PROGRESS UPDATE 
A report was submitted by the Chief Education Officer providing an update on
progress made within the framework developed to provide high quality Early
Learning and Childcare in West Dunbartonshire Council. 
After discussion and having heard the Senior Education Officer – Early Learning &
Childcare and the Chief Education Officer in further explanation of the report and in
answer to Members’ questions, the Committee agreed to note the progress to
ensure delivery of the statutory entitlement of 1140 hours of high quality early
learning and childcare. 
ADDITIONAL SUPPORT NEEDS STRATEGY UPDATE REPORT 
A report was submitted by the Chief Education Officer providing an update on the
progress of the strategy to support children and young people with Additional
Support Needs (ASN). 
After discussion and having heard the Senior Education Officer – Services for
Children & Young People in further explanation of the report and in answer to
Members’ questions, the Committee agreed to note the progress on the strategy and
plans to address the projected increase in demand for services. 
SCHOOL LEAVER DESTINATIONS 2020/21 
A report as submitted by the Chief Education Officer providing an update on our
partnership approach to improve the number of our young people leaving school and
entering a positive destination. 
After discussion and having heard the Senior Education Officer – Policy,
Performance & Resources and the Chief Education Officer in further explanation of
the report and in answer to Members’ questions, the Committee agreed to note the
analysis and action plan recommended for improvement. 
UPDATE TO DEVOLVED SCHOOL MANAGEMENT (DSM) GUIDANCE 
A report as submitted the Chief Education Officer seeking approval of changes made
to the Devolved School Management (DSM) Guidance in Education establishments. 
After discussion and having heard the Senior Education Officer in further explanation
of the report, the Committee agreed to approve the update to the Devolved School
Management (DSM) Guidance which was contained in Appendix 1 to the report. 
Page 9

Page 10

The meeting closed at 3.15 p.m.
Page 10

Page 11

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Education Officer
Educational Services Committee: 28 September 2022
___________________________________________________________________
Subject: Proposal Paper and launch of statutory consultation for the
establishment of a new school to support additional support
needs at former Riverside Early Learning and Childcare Centre.
1. Purpose
1.1 The purpose of this report is to seek Committee’s approval for the launch of
the statutory consultation document by the Chief Education Officer under the
terms of the Schools (Consultation) (Scotland) Act 2010 on the proposal to
open a new additional support needs school in the site of  the former
Riverside ELC on the St Martin’s Primary School site.
2. Recommendations
2.1 It is recommended that Committee:
a) approves the launch of the statutory consultation document by the
Chief Education Officer under the terms of the Schools (Consultation)
(Scotland) Act 2010 on the proposal to establish a new additional
support needs school to be located in the former Riverside ELC site
within the campus of the current St Martin’s Primary School and;
b) agrees that the consultation period should run from Monday 3rd October
2022  to Friday 11th November 2022, a total of 33 days when the
schools are open for pupils and reflecting the October holiday week
and;
c) agrees that a report outlining the results of the consultation and making
appropriate recommendations be presented to the meeting of the
Educational Services Committee provisionally scheduled to be held on
16th  March 2023.
3. Background
3.1 On 16th March 2022, Council approved the expansion of the school learning
estate to meet projected needs of the Additional Support Needs (ASN) sector.
3.2 On 16th March 2022, the Educational Services Committee:
a) Agreed the suggested phases of development and associated capital
works and;
ITEM 7
Page 11

Page 12

b) Agreed that a report outlining the results of the consultation and making
appropriate recommendations be presented to a future meeting of the
Educational Services Committee and;
c) Agreed to allocate funding from the unallocated school improvement
capital plan and;
d) Noted the progress of the work of the ASN Strategy and identified
growth needs.
4. Main Issues
4.1 Because this proposal, if enacted, would involve the opening of a new school,
the Council is required to carry out a consultation process as detailed in the
Schools (Consultation) (Scotland) Act 2010.
4.1.1 The 2010 Act requires the education authority to publish a “proposal paper”
which sets out the details of the relevant proposal. The Proposal Paper for
this project is provided as Appendix 1 to this report.
4.1.2 The 2010 Act also requires the education authority to publish an “educational
benefits statement” in relation to any proposal which falls under the terms of
the act. The Educational Benefits Statement in relation to the ASN Estate
proposal is included in section six of the Proposal Paper which forms
Appendix 1 to this report.
4.1.3 The Act defines the statutory consultees for a proposed school opening. All
these groups will be invited to respond to this consultation, as would the
Archdiocese of Glasgow of the Catholic Church. The proposal question
provided at paragraph 7.17 of Appendix 1 to this report will form the basis of
the written consultation and may be submitted by hand, by post or
electronically to the council. 
4.1.4 The Act requires a consultation period of at least 6 weeks which must include
at least 30 school days. It is proposed that the consultation period for this
project should run from Monday 3rd October 2022  to Friday 11th November
2022, a total of 33 days
4.1.5 The education authority is required, as part of the consultation process, to
hold public meetings to discuss the relevant proposal. The public meetings for
this proposal will be held on Tuesday 25th October 2022 - online at 4pm, and
in-person at St Martin’s Primary school at 7pm.
4.1.6 The 2010 Act requires the involvement of Education Scotland in the process.
Education Scotland must be provided with the Proposal Paper, the
Educational Benefits Statement and the submissions made to the education
authority during the consultation period (or, by agreement, a summary of
these submissions). Education Scotland then prepares a report on the
educational aspects of the proposal.
Page 12

Page 13

4.1.7 The education authority is then required to publish a “Consultation Report”
containing a record of the total number of submissions received, a summary
of those submissions and of any oral representations made during the public
meeting, a copy of the Education Scotland report and a statement of the
authority’s response to the written and oral submissions and to the Education
Scotland report. Providing all necessary procedures can be undertaken in
timescale outlined in section 4.3 below, it is planned to present the
Consultation Report on the ASN learning estate expansion to the meeting of
the Educational Services Committee provisionally scheduled to be held on
16th March 2023.
4.2 Work to redevelop the vacated ELC will take place whilst education in the St
Martin’s site continues.  This will be planned to ensure minimal disruption to
the school and facilities at their disposal. Plans will be implemented to ensure
effective communication with all stakeholders, health and safety procedures
and risk assessments. 
5. People Implications
5.1 If the proposals are accepted, there will be some effect on staffing levels
within the new campus, particularly within cleaning and facilities management
services and as there will be two establishments on the campus to be
supported.  There is potential to create a number of teaching and support staff
posts. At time of writing, this is being developed.  Any changes would be
managed via the Council’s policies for managing such changes. The
timescales involved mean that any additions or recruitment of staff will be
managed in a planned way.
6. Financial Implications
6.1 There are no associated costs for undertaking the statutory consultation. Time
to complete the activities would be covered by central officers.
7. Risk Analysis
7.1 Failure to continue to expand the ASN learning estate would lead to increased
inequalities for young people and reputational damage for the Council.
7.2 The risks of failing to complete the project on time and within budget will be
controlled via robust project management based on the Council’s substantial
and successful recent experience in delivering schools projects.
8. Equalities Impact Assessment (EIA)
8.1 An Equalities Impact Assessment has been undertaken for this proposal
(Appendix 2).This project will improve the quality of educational experience for
young people in West Dunbartonshire who have severe and complex learning
needs and there are therefore no negative impacts relating to equality issues.
9. Consultation
Page 13

Page 14

9.1 This project has been the subject of extensive discussion by the Strategic
Asset Management Group and the Corporate Management Team as well as
by Council and the Educational Services Committee.
9.2 Legal Services and the Section 95 Officer have been consulted on the content
of this report.
9.3 As detailed in section 4.2 of this report and in appendix 1, consultation with all
statutory consultees will be conducted on the proposals in this report in
accordance with the requirements of the Schools (Consultation) (Scotland)
Act 2010.
10. Strategic Assessment
10.1 The improvements in the learning environments in the adaptation of the
former ELC promotes and encourages imaginative and innovative learning
and teaching thereby increasing attainment and achievement. This in turn
leads to the strategic objective of a strong local economy and increased
employment opportunities.
________________________
Laura Mason
Chief Education Officer
Date: 10/8/22 2022
Person to Contact: Claire Cusick
Senior Education Officer
Email: claire.cusick@west-dunbarton.gov.uk 
Appendices: Appendix 1: Proposal Paper, incorporating Educational
Benefits Statement
Background Papers: Educational Services Committee Report 16th March 2022
Expansion of the School Learning Estate.
Schools (Consultation) (Scotland) Act 2010
Wards Affected: All wards
Page 14

Page 15

West Dunbartonshire Council
Educational, Learning & Attainment
A Proposal Document 
For
Additional Support Needs (ASN) School within the former Riverside ELCC
in the Vale of Leven area.
The following Schools and Early Learning and Childcare Centres are
affected by this Proposal Document:
Former Riverside ELCC premises and St Martin’s Primary School.
This document has been issued by West Dunbartonshire Council for
consultation in terms of the Schools (Consultation) (Scotland) Act 2010
Appendix 1
Page 15

Page 16

1. Introduction 
1.1 At its meeting on 15th June 2022, the Educational Services Committee of
West Dunbartonshire Council is asked to approve: 
a) the launch of the statutory consultation  the Chief Education Officer
under the terms of the Schools (Consultation) (Scotland) Act 2010
on the proposal to redevelop the former Riverside ELCC to form a
new school supporting ASN needs on the St Martin’s Campus and
to;
b) agree that a report outlining the results of the consultation and
making appropriate recommendations be presented to the meeting
of the Educational Services Committee in March 2023. 
2. The Proposal 
2.1 West Dunbartonshire Council is proposing, subject to approval from
Education Services Committee and the outcome of the consultation
process: 
• To establish a new school providing education for young people
with additional support needs in the former Riverside ELC
premises from August 2024. 
2.2 A map identifying the locations of the affected establishment is included
as Appendix 1. 
3. Background to the Proposal 
3.1 Our Additional Support Needs Strategy has recognised there is a need for
expansion to the ASN Learning Estate to meet projected needs.  This
proposal will support the cohort of pupils due to transition from primary to
secondary education in August 2024. 
3.2 It is anticipated young people who will attend this setting will transition
from their existing primary school  settings to S1 in 2024 when the new
school opens. This negates the need for alternative premises in our
Secondary Estate. 
3.3 The improvements in the learning environments in the new builds and
other educational establishments promotes and encourages imaginative
and innovative learning which will meet the needs of learners thereby
improving outcomes for them. This in turn leads to the strategic objective
of a strong local economy and increased employment opportunities. 
Page 16

Page 17

3.4 West Dunbartonshire has the commitment to ensure all of our children are
educated in buildings that meet ‘Category A or B’ as described by the
Scottish Government. Notwithstanding the vast improvements in the
learning estate, there remains, within the primary school estate,
establishments that over time could find themselves with a condition
rating of C (Poor). The suitability of older educational establishments for a
modern curriculum is also challenging, and therefore it is clear that, for
both educational and financial reasons, it is beneficial for the Council to
consolidate and modernise its learning estate by a process of co-location,
new build and closure. 
3.5 The Learning Estate Project Board and Strategic Asset Management
Team consider a range of options for improving the learning estate,
including: school condition and suitability, roll and occupancy level;
potential for refurbishment; location and potential for amalgamation,
closure or co-location; potential for co-location of school(s) and ELCC;
and availability of suitable or existing sites for new builds, preferably in the
ownership of the Council. The development of the St Martin’s site
supports these objectives. 
3.6 On 16nd March 2022, Council approved funding from the unallocated
School Improvement Capital Plan to support this re-development.  
3.7 On 16th March 2022, the Educational Services Committee: 
a) Noted the projected growth of ASN needs; 
b) Agreed that a report outlining the results of the consultation and
making appropriate recommendations be presented to a future
meeting of the Educational Services Committee. 
c) Agreed suggested phases of development and associated capital
works for the ASN Learning Estate; 
d) Agreed to allocate funding from the unallocated School
Improvement capital plan.   
4 Current Position 
4.1 In line with national trends, it is recognised there is an increasing number of
pupils with a complexity of Additional Support Needs in West Dunbartonshire
Council.  This has previously been addressed with the expansion of our
Primary ASN provision.  However, it is now necessary to expand the
Page 17

Page 18

secondary provision as this cohort moves through primary to secondary
school and to address projected needs until 2027.   
4.2 In August 2022, Riverside ELCC which was situated within the St Martin’s
campus closed. Children and staff moved to the new Renton ELCC.  Since
then the site has been empty and through investigation identified as a
suitable site for the new ASN school required to meet projected needs. 
5 Proposed new Campus 
5.1 Proposed site 
5.1.1 Thee council is proposing  to redevelop the former Riverside ELCC into a
new school for young people with additional support needs. 
5.1.2 The main reasons for the choice of this site are: 
• the site is already within the Council’s ownership;
• the suitable size, ground conditions, topography and the availability of
utility services on the site;
• the site is located next to St Martin’s Primary School and Vale of
Leven Secondary school which will provide opportunities for
community building, collaborative planning and learning. 
5.1.3 The children who will learn in the new school will transition there from their
primary schools when the school opens. Contingency planning will be
considered should there be delay to this. 
5.2 Proposed Facilities 
5.2.1 Facilities will require to accommodate 36 young people and appropriate staff
ratios. 
5.2.2 The draft accommodation schedule for the new campus is currently under
development. However it should be noted that modern purposely designed
educational accommodation is the default position, something we have much
experience of based on current and recent projects. In particular the
education, care and welfare provisions will be planned with the complex
needs of the young people in mind. 
5.2.3 The two schools located on the campus; St Martin’s Primary School and the
new proposed ASN school, will operate as separate establishments, with
their own teaching and support staff. Discussions with the Archdiocese of
Glasgow will ensure that the plans for the co-location of the two schools are
Page 18

Page 19

in accordance with the Catholic Church’s protocols for co-located
establishments. 
6 Educational Benefits Statement 
6.1 Introduction 
6.1.1 West Dunbartonshire Council believes this proposal will provide a range of 
educational benefits and enhance the Council’s efforts to meet statutory
obligations enshrined in:
• the Education (Scotland) Act 1980;
• the Standards in Scotland’s Schools etc. Act 2000;
• the Local Government in Scotland Act 2003;
• the Education (Additional Support for Learning) (Scotland) Act 2004;
• the Educational (Additional Support for Learning) (Scotland) Act 2009;
• the Equality Act 2010; 
• Early Learning and Childcare Statutory Guidance and Care Commission
requirements; and
• the Children and Young People (Scotland) Act 2014. 
6.1.2 The proposal is aligned to the UN Convention on the Rights of the Child
which affirms that every child regardless of race, gender or disability has a
right to an education and to develop his or her fullest possible potential. 
6.1.3 The re-development will provide modern, fit-for-purpose educational facilities
which are specifically designed to create a stimulating and supportive
learning environment. 
6.1.4 The new school will be designed to provide a fully accessible and inclusive
environment to accommodate the needs of all users of the building. It will be
designed to fully meet the principles of inclusion whilst supporting the
complex needs of the young people. 
6.1.5 The facilities will support the delivery of Curriculum for Excellence by
providing an environment conducive to nurturing successful, confident and
responsible young people who are able to learn and apply their learning in
ways that will help them to reach their full potential and respond to the variety
and pace of change they will encounter in today’s and tomorrow’s world. The
facilities will be constructed in accordance with the latest building standards
and regulatory requirements relating to building design, providing a variety of
accommodation to deliver experiences across all eight curriculum areas. 
6.2 Likely effect of proposal on pupils who will attend the new school 
6.2.1 There are a number of educational benefits associated with the design of the
Page 19

Page 20

new ASN school: 
• Modern, dedicated and multi-purpose spaces, designed to deliver all
areas of Curriculum for Excellence and to encourage innovative and
flexible teaching and effective learning;
• education in a comfortable, environmentally efficient, wind- and water-
tight environment in which the use of natural light is maximised;
• access to enhanced internal and external facilities;
• well planned internal spaces which are planned to support the complex
needs of the young people who will be using them; 
• use of well-designed social and circulation spaces within the building;
• use of modern toilets and washing facilities;
• an integrated ICT infrastructure, including wireless capability, designed to
maximise the use of the latest technology to enhance learning;
• specially designed general purpose areas, designed to encourage
independent and collaborative learning;
• provision of furniture that is ergonomically designed, age appropriate and
provides flexibility to change configuration and support a variety of  learning
and teaching approaches;  
• a range of the most modern and appropriate facilities for the education,
support and care needs of the children;
• attractive indoor dining facilities, serviced by a modern catering kitchen;
• management, office and staff facilities, suitably located in order  to
support staff in delivering the curriculum and facilitate a positive school
ethos and collegiate working culture;
• integrated infrastructure and storage space, designed to ensure that the
functional areas of the school are not compromised and are fully available
and accessible for learning and teaching purposes;  
• dedicated resource base space incorporating reprographics equipment
and other facilities for use by teaching and support staff to support the
production of pupil resources;
• a safe and secure campus.   
Young people attending the new school will benefit from all of the above
features, and as a consequence, their learning and social experience of
school and integrated community spaces will greatly improve. 
6.3     Likely effect of Proposal on Other Users of the Schools 
6.3.1 As part of West Dunbartonshire Council’s efficiency measures, the Council
has greatly reduced the number of external lets in primary schools, instead
concentrating lets in secondary schools which are generally already open in
the evenings. Currently, there are no sessional lets in the schools affected. 
Page 20

Page 21

6.4 Likely effect of Proposal on other pupils across West Dunbartonshire
schools 
6.4.1 The proposal will result in the ability to meet the needs of more young people
with additional support needs across West Dunbartonshire. It is anticipated
these allocations will be managed through existing allocation processes. 
6.4.2 The enhanced facilities will enable the Council  to meet the needs of pupils
within the Authority. It will support transition processes for pupils moving from
one additional support needs setting to another. 
7.0 The Consultation Process 
7.1 At its meeting on 16th March 2022, West Dunbartonshire Council authorised
the Chief Education Officer to prepare for formal consultation in terms of the
Schools (Consultation) (Scotland) Act 2010 in relation to the Proposal
specified in section 2 above and the arrangements noted below have been
made to discharge that instruction. 
7.2    The initial aspects of the consultation process are specified in the following table: 
Launch of Statutory Consultation Process  3 Oct 2022
Public Meetings      25th Oct 2022
End of Statutory Consultation Process   25th Oct 2022
Compilation and issue of Section 8 (1) 
Information to Education Scotland   18-26 Nov 2022
Education Scotland response period   29 Nov – 21 Dec 2022
Consultation Report published   22 Feb 2023
Outcome of Consultation at committee  16 Mar 2023 
7.3      The Proposal Document will be issued by the Chief Education Officer to the
consultees included in the following list: 
• Education Scotland;
• The Archdiocese of Glasgow of the Roman Catholic Church;
• the Parent Councils of St Martin’s Primary School and Vale of Leven
Academy  due to their adjacency to the proposed new school; 
• the parents/carers of any children expected by West Dunbartonshire
Council to attend the new schools within two years of the date of
publication of this Proposal Document (with that date of publication
being defined in the table included in section 7.2 above); 
• the teaching and support staff at St Martin’s Primary School; 
• user groups or individuals who currently utilise the facilities at St
Martin’s Primary School;  
Page 21

Page 22

• the constituency MSP; 
• the constituency MP; and 
• Neighbouring local authorities. 
7.4    The Proposal Document will also be published on the West Dunbartonshire
Council website and copies will also be available from the reception point at
the following West Dunbartonshire Council buildings: 
• St Martin’s Primary School, Place of Bonhill, Renton, Alexandria G82
4QB
• Alexandria Library, Gilmour Street, Alexandria G83 0DA
• West Dunbartonshire Council, 16 Church Street, Dumbarton G82 1QL  
7.5     The Proposal Document can also be made available in alternative formats or
in translated form for readers whose first language is not English. Please
make contact with West Dunbartonshire Council’s Educational Services, 16
Church Street, Dumbarton G82 1QL, and Tel: 01389737391 or e-mail:
educationconsultation@west-dunbarton.gov.uk 
7.6  A public notice to advertise the consultation will be placed in the Dumbarton
Reporter and Clydebank Post and the same notice will be displayed on the
reception area notice boards in the above noted West Dunbartonshire
Council buildings. 
7.7      Two public meetings will be held on Tuesday 25th October 2022; one online
at 4pm and one in-person at St Martin’s Primary School at 7pm, at which
representatives of West Dunbartonshire Council’s Educational Services
Department will be in attendance to present the details of the Proposal,
answer questions and record comments/representations from those in
attendance at the meeting. Education Scotland will also attend the public
meetings. 
7.8      Comments/representations may also be made by contacting 01389 737391;
by email to   educationconsultation@west-dunbarton.gov.uk 
or by writing to the Chief Education Officer at West Dunbartonshire Council,
16 Church Street, Dumbarton G82 1QL. Comments/representations should
be received no later than 11th November 2022. 
7.9  At the end of the consultation period, the Chief Education Officer will submit a
copy of all written comments/representations, together with oral
comments/representations made at the public meeting, to Education
Scotland who will prepare a professional and independent report on the
educational aspects of the Proposal. 
7.10  The Chief Education Officer will consider all written and oral
comments/representations received in relation to the Proposal which have
Page 22

Page 23

been received during the consultation period, together with Education
Scotland’s report, and prepare a Consultation Report. 
7.11  The Chief Education Officer shall publish the Consultation Report which shall
be issued (either in full or as a summary document) to the consultees
specified in section 7.3 above; be made available on Council’s website; be
available in printed format from the reception points at West Dunbartonshire
Council buildings specified in section 7.4 above; and be issued to all those
who responded and provided contact details through the consultation
process. 
7.12    The Consultation Report shall be published to allow a period of no less than
3 weeks prior to the Council’s Decision to either implement or reject the
Proposal.    
7.13   The Chief Education Officer shall immediately notify Scottish Ministers if the
Council’s Decision is to implement the Proposal which would redevelop the
former Riverside ELC to open a new school to support young people with
additional needs of young people.  
7.17 The proposal question is as follows: 
Are you in favour of the proposal to redevelop the former Riverside ELCC for
use as a school for young people with additional support needs? Yes / No 
Consultees may also wish to provide reasons for their opinions. 
Appendix 1 School Location 
Page 23

Page 24

Page 24

Page 25

WEST DUNBARTONSHIRE COUNCIL
Report by Laura Mason, Chief Education Officer
Educational Services Committee: 28 September 2022
___________________________________________________________________
Subject: Strategy to Raise Attainment and Achievement in West
Dunbartonshire
1. Purpose
1.1 The purpose of this report is to update the Educational Services Committee
on progress with implementing Educational Services’ improvement priorities
for attainment and equity.
2. Recommendations
2.1 The Educational Services Committee is asked to:
1) note the increased levels of local and national accountability to deliver
improved attainment and a narrowing of the attainment gap by the setting
of stretch aims and targets; and
2) note plans to support education recovery and improvement in session
2022/ 23 building on the success of West Dunbartonshire’s Attainment
Strategy delivered in academic session 2021/22.
2.2 The Committee will be provided with regular update reports advising of
progress.
3. Background
3.1 In line with the Strategy to Raise Attainment and Achievement the Committee
receives regular reports outlining progress against this strategic priority.
3.2 The Scottish Attainment Challenge was launched by Scottish Government in
2015 and set out to accelerate the pace in which Scotland closes the poverty
related attainment gap. West Dunbartonshire was one of 9 Challenge
Authorities receiving Attainment Scotland Funding since 2015. As a Challenge
Authority West Dunbartonshire delivered a successful strategy to raise
attainment and narrow the poverty related attainment gap.
3.3 As reported to Committee in June 2022 the change from Challenge Authority
Funding to Strategic Equity Funding in 2022 has reduced the annual income
to West Dunbartonshire Council. The Attainment Challenge allocation to the
Council prior to 2022 was £2,043,815 in both 2020/21 and 2021/22. The
allocation in 2022/23 is £1,745,797 with further annual reductions in each
financial year up to 2025/26. Officers have developed an Improvement
ITEM 8
Page 25

Page 26

Framework, Attainment Action Plan to limit the impact of the reduced funding
to West Dunbartonshire between 2022 and 2026. 
3.4 As reported to Committee in June 2022 the refreshed Scottish Attainment
Challenge published in March 2022, set an expectation that local authorities
should identify  specific local authority stretch aims for improving outcomes for
all while closing the poverty-related attainment gap. These stretch aims
should be both ambitious and achievable within local contexts; and focus on
the specific aims which local evidence and data suggest are the priority areas
for improvement.  These at a minimum these should include (core) stretch
aims for both overall progress and for reducing the poverty-related gaps in the
following: 
• achievement of Curriculum for Excellence Levels (literacy combined and
numeracy combined);
• the proportion of school leavers attaining 1 or more pass at SCQF level 5
based on the “Summary Statistics for Attainment and Initial Leaver
Destinations” publication; 
• the proportion of school leavers attaining 1 or more pass at SCQF level 6
based on the “Summary Statistics for Attainment and Initial Leaver
Destinations” publication;
• the proportion of 16-19 olds participating in education, employment or
training based on the Annual Participation Measure produced by Skills
Development Scotland; and
• a locally identified aim for health and wellbeing, to be measured using
local datasets. 
Each identified stretch aim should clearly articulate ambitions for progress for
all pupils and progress in narrowing the poverty-related attainment gap in
2022/23. Performance will be monitored are reported on nationally. 
3.5 West Dunbartonshire’s stretch aims and targets whilst set by the local
authority will be scrutinised by the national agencies. Officers are working
collaboratively with the national agencies and West Dunbartonshire’s schools
to set stretch aims for West Dunbartonshire to be achieved by December
2023. 
3.6  West Dunbartonshire is well placed to achieve stretch aims by 2023            
building on the success of the authority Strategy to Raise Attainment and 
Achievement launched in 2015 which increased attainment levels and
the life chances of young people year on year.   
3.7 A newly established Improvement Board chaired by the Chief Education
Officer will monitor progress towards stretch aims and targets with regular
updates to Education Committee. 
3.8 The West Dunbartonshire Education Covid Recovery Plan (as one dimension
of the Strategy to Raise Attainment and Achievement) successfully increased
educational attainment; and a narrowing of the poverty related attainment gap
Page 26

Page 27

in the Broad General Education (P1, P4, P7 and S3) in academic session
2021/2022. 
4.0       Main Issues 
4.1  West Dunbartonshire has benefitted greatly from the Scottish Attainment
Challenge Funding since its inception in 2015 and its associated funding
streams, which have helped us increase attainment levels and the life
chances of young people.  The change in Scottish Attainment Challenge
Funding from highly targeted to 9 Councils, to a new, nationally distributed
formula in 2022 is a 58% decrease in funding for West Dunbartonshire
Council by 2025/26. 
4.1.1 The service has demonstrated a strong attainment performance at early level
and primary in academic session 2021/22. Prior to the pandemic West
Dunbartonshire had successfully raised attainment in the senior phase. Early
analysis of session 2021/22 SQA performance would suggest a slight dip in
attainment and attendance for cohorts of young people in our secondaries
compared to last session. 
4.1.2 The attendance rates of young people living in our areas most affected by
poverty has dipped since pre lockdown.  We are also seeing an increase in
numbers of referrals to mental health services. 
4.1.2  The decrease in Scottish Attainment Challenge funding (2022 - 2026) 
reduces resource available to provide bespoke and intensive support to our
children and young people in greatest need; and will impact on the overall
capacity of the service to achieve ambitious stretch aims and targets. 
4.1.3  To build on the successes of the recovery strategy in session 2021/22 and
address areas of challenge the service has strengthened the Education
Improvement Framework which aims to provide challenge and support to
schools to assist them to achieve ambitious stretch aims and targets for
improvement. This strengthening was delayed due to COVID related
disruption to education delivery in the period March 2019 to June 2022. 
4.2  Improvement Framework 
4.2.1 As reported to Committee in June 2022 the local authority has a statutory duty
for the quality provision in schools. The Service Improvement Framework has
been developed to monitor quality and build capacity for improvement through
collaboration between the central officers and schools. The Framework is
Appendix 1 to this report. 
4.2.2  The Improvement Framework operates an annual programme of quality
assurance, monitoring and capacity building to support education leaders to
implement a continuous programme of improvement. Officers conduct visits to
all schools and Early Learning and Childcare Centres to monitor attainment,
attendance, quality of learning, teaching and assessment. A team of 2
Education Officers conduct the programme of visits to all schools with
headteachers supporting as part of the visit programme. Officers provide
Page 27

Page 28

reports and updates on school performance to ensure all schools are on track
to deliver improved outcomes. 
4.2.3 Another dimension to the Improvement Framework is monitoring the quality of
planning and delivery of outcomes using Pupil Equity Funding (Scottish
Government funding devolved directly to schools). 
4.2.4  As reported to Committee in June, 2022 West Dunbartonshire’s schools
receive a larger proportion of the Attainment Scotland Fund compared to the
local authority. For example, in 2021 the local authority received  £ 1,745,797
Strategic Equity Funding; and West Dunbartonshire schools received 
£3,380,835 Pupil Equity Funding. School performance feeds into the overall
local authority performance against national stretch aims and targets. Officers
are working closely with schools to ensure high quality delivery and output as
a key workstream in the Improvement Framework. 
4.2.5 The current economic challenges and residual impact of the pandemic are
recognised as risks to the achievement of attainment targets and outcomes.
To sustain the gains made to narrow the attainment gap requires a sharp
focus on the well being, attendance and engagement of our young people
most at risk of missing out. The Chief Education Officer and Senior Officers
are working closely with headteachers to monitor use of resource, quality of
experience and achievement of improvement outcomes. 
4.4 Education Development 
4.4.1 Learning Technologies: West Dunbartonshire’s commitment since 2015 to
the provision of computer devices for children and young people has seen an
annual increase with the number of devices purchased almost at a ratio of
one device for every one pupil in primary and secondary school: 
Year                               Purchased   Cumulative Total
August 2015 - 16                2153        2153
August 2016 - 17                857          3010
August 2017 - 18                1423        4433
August 2018 - 19                1158        5591
August 2019 - 20                322          5913
August 2020 - 21                3441        9354
August 2021- May’ 22       844         10,198
August 2022   10,198 11,198 
4.4.2  Instrumental Music Service (IMS): The WDC IMS Ensembles (Senior and 
Training Concert Bands, Senior and Training String Ensembles and  ‘Funk
sKool’) will resume rehearsals on the week beginning 5th September at the
Music service Base in Dalreoch Primary. The pupils will take part in weekly
rehearsals and will perform 2 concerts at Clydebank Town Hall. The
Christmas Concert will take place on Thursday 8th December and the Spring
Concert on Thursday 23rd March 2023.In addition to the authority wide
Page 28

Page 29

ensembles, the secondary school ensembles will be given the opportunity to
perform at school and community events. 
4.4.3  Creative and Cultural Learning Experiences: building on the success of
last session’s commitment to provide equitable access to  cultural
experiences for children and young people in West Dunbartonshire a
programme is planned for session 2022/23. Examples of events are: 
• Scottish Ballet 'Safe to Be Me' (dance) ;
• Theatre in Schools Scotland 'Four Go Wild in Wellies' (dance);
• Theatre in Schools Scotland 'Chalk About' (dance); and
• Travelling Gallery (visual Art) - Partnership with Libraries and Cultural
Services. 
4.4.4  Languages1 / 2: 1+2 Languages
The national focus on the implementation of the 1+2 Languages policy
continues this session. The focus for all our schools is to continue to embed a
modern language into learning experiences and provide opportunities for an
additional language from P5-7.There is a comprehensive  West
Dunbartonshire 1+2 Languages website bringing together all available
resources and  guidance which will support all schools to further engage with
the 1+2 Languages Policy. Free online resources will be developed and
shared to promote family language learning in a friendly and accessible
way. All learning and teaching resources are available on Campus@WDC.   
4.4.5  West Dunbartonshire Skills Framework
A bespoke West Dunbartonshire Skills Framework has been developed and
was launched. The Framework underpins curriculum planning and enables us
to record and celebrate the many achievements of our young people as they
progress through school into positive and sustained destinations. The
Framework is structured around a set of six competencies: creativity, critical
thinking, collaboration, communication, citizenship and character. These aim
to develop knowledge, skills, attributes and qualifications. 
5. People Implications 
5.1 As reported to Council in February 2022 the Scottish Attainment Challenge
funding enabled the provision of additional temporary (seconded) funded
posts within the education service, partner council services and external
providers. The main areas supported through this additionality are: early
intervention in learning, welfare advice and poverty support, nurturing mental
well being, community safety, school and learning community collaboration
to improve quality, professional learning and personalised learning
pathways. The decreased funding will reduce the number of staff available to
deliver in these areas with the seconded staff returning to their substantive
posts, and any backfill element will cease. 
5.2  As reported to Council in February 2022 in session 2021/22 the local
authority Scottish Attainment Challenge funded 41.5 posts. The new funding
Page 29

Page 30

model will reduce this number of posts by 42% from 41.5 to 24.07 posts by
2025/2026. In session 2022/23 the Scottish Equity Fund will fund 39.0 posts. 
6. Financial and Procurement Implications 
6.1 Since its inception in 2015/16 to March 2022 the Council will have received
£12,642,432 in funding. Attainment Challenge allocations to the Council have
been £2,043,815 in both 2020/21 and 2021/22. Funding in 2022/23 has been
confirmed to be £1,745,797 which is a reduction of £298,018 in 2022/23. 
6.2 The Education Recovery Plan at Appendix 1 has been funded from
Education’s Budget related to COVID flexibilities. 
7. Risk Analysis 
7.1 The reduced funding model coupled with the current context of the pandemic
increases risk of a negative impact on priorities to reduce inequalities and
improve outcomes for all learners in our communities. 
8. Equalities Impact Assessment 
8.1  A full Equality Impact Assessment has been completed and has identified the
decrease in funding will limit ELA’s strategic ability to deliver and progress a
range of functions within the raising attainment agenda. These include, but
are not limited to scrutiny and challenge teams, resources to support out of
hours and holiday learning as well as access to wellbeing support for parents.
Scope exists to mitigate the adverse impact on pupils, however this requires
adaptations across key service areas through the modification of plans to
reflect the reduction in Scottish Government Funding.   
9. Consultation 
a. Legal Services and the Section 95 Officer have been consulted in relation to
the content of this report. 
b. In response to the revised funding model consultation is being  conducted
with stakeholders to produce West Dunbartonshire’s Scottish Equity Fund 
plan for 2022-2026. 
10. Strategic Assessment 
10.1   This reports reflects the Council’s 2017-2022 overarching priority to reduce
inequalities for the people of West Dunbartonshire which supports improved
outcomes for all learners in our community. 
Laura Mason
Chief Education Officer
June 2022
___________________________________________________________________
Page 30

Page 31

Person to Contact: Julie McGrogan, Senior Education Officer, Department of
Education, Learning and Attainment, Council Offices, 16
Church Street, Dumbarton, G82 1QL
Telephone No: 01389 737316
Email: julie.mcgrogan@west-dunbarton.gov.uk 
Appendix: 1.  Education Recovery Plan
2. Equalities Impact Assessment Screening
Background Papers: None 
Wards Affected: All wards 
Page 31

Page 32

Appendix 1 
Education Recovery Funding - Proposals   
Action Rationale Description of Activities Recruitment Total Cost
1 Establish 
'One-ery'
model at
school campus
and ELCC.
Build on capacity created at campus models for the One-ery model
approach. Staff to work across the ELCC and P.1 to provide additional
individual and small group  support to our children during this
recovery phase. 
1. Employ 6 Early learning and
Childcare Workers or LAs. 
ELCO x 6.0FTE (Term
Time)
£178,572
2 Language and
communication
development
Language and communication development is a significant concern as
a result of the pandemic. An allocation to ELCC and Primary to enable
staff capacity building in this area. 
1. Establishing a team to deliver
targeted training and support to all
establishments 
0.4FTE Educational
Psychologist
£32,631
0.4FTE Speech and
Language Therapist
£21,840
3 Interrupted
Learner Service
Due to the impact of the pandemic on mental health, an increased
number of our children and young people are finding it difficult to
engage in full time, face to face learning, resulting in an increased
demand of our Interrupted Learner Service. 
1. Expand provision of IL Service to
meet service demands
2.0FTE Class
Teachers
2.0FTE Pupil and
Family Support
Workers (35 x 52
weeks)
£114,314 
£59,100
4 Inclusion Team The pandemic has had significant impact on the health and wellbeing
of our young people, with many struggling to cope on return to the
classroom. Develop and promote strategies establishments to ensure
that the rights of our children and young people are at the forefront
of our approaches to inclusion and learning and teaching. 
1. Develop and promote strategies
to lead to improvement in
wellbeing; rights based learning; and
promote approaches to inclusion.
1.0FTE Depute Head
Teacher (Primary)
(Based on DHT2)
£72,854
5 Excellence and
Equity
Recovery Team
The Excellence and Equity Recovery Team would support school
planning and delivery of improvement strategy to mitigate impact on
attainment and equity outcomes.     
Attainment Recovery
Teachers:  Literacy , Numeracy,
Assessment and Moderation 
1.0 FTE Head Teacher
(Primary) (Based on
HT10)
£92,170
2.0 FTE Class
Teachers
£114, 314 
Page 32

Page 33

1
Appendix 2
EQUALITY IMPACT: SCREENING AND ASSESSMENT FORM
This form is to be used in conjunction with the Equality Impact Assessment Guidelines.  Please refer to these before starting;
if you require further guidance contact community.planning@west-dunbarton.gov.uk 
Section 1: Policy/Function/Decision (PFD) Details
A PFD is understood in the broad sense including the full range of functions, activities and decisions the council is
responsible for.
Name of PFD: Strategy to Raise Attainment and Achievement in West Dunbartonshire Update
Lead Department & other
departments/ partners involved:
Educational Services
Responsible Officer Laura Mason/ Julie Mc Grogan
Impact Assessment Team Julie Mc Grogan – Senior Education Officer 
Alan Munro – Quality and Performance Officer
Is this a new or existing PFD? NEW
Start date:  1.12.21    End date: 1.12.21
Who are the main target groups/
who will be affected by the PFD?
Children, young people and families in West Dunbartonshire
Is the PFD Relevant to the General duty to eliminate
discrimination, promote equal opportunities or foster good
relations? Please enter brief detail
NO -
The purpose of this PFD is to update members on the
activity and progress with regard to implementing West
Dunbartonshire’s Strategy to Raise Attainment and
Achievement; and advise of any future changes to the
Scottish Attainment Challenge. 
Yes: If yes, complete all sections, 2-9
No: If no, complete only sections 8-9
Page 33

Page 34

2 
If don’t know, complete sections 2 & 3 to help assess relevance 
Section 2: Evidence 
Please list the available evidence used to assess the impact of this PFD, including the sources listed below. Please also
identify any gaps in evidence and what will be done to address this.
Available evidence: 
Consultation/
Involvement with
community, including
individuals or groups or
staff as relevant 
Research and relevant
information 
Officer knowledge 
Equality Monitoring
information – including
service and employee
monitoring 
Feedback from service
users, partner or other
organisation as relevant 
Other 
Are there any gaps in evidence?   Please indicate how these will be addressed
Gaps identified 
Measure to address
these 
Page 34

Page 35

3 
Note: Link to Section 6 below Action Plan to address any gaps in evidence 
Section 3: Involvement and Consultation
Include involvement and consultation relevant to this PFD, including what has already been done and what is required to
be done, how this will be taken and results of the consultation.
Please outline details of any involvement or consultation, including dates carried out, protected characteristics.  Also
include involvement or consultation to be carried out as part of the developing and implementing the policy.
Details of consultations Dates Findings Characteristics   
Race   
Sex   
Gender Reassignment   
Disability   
Age   
Religion/ Belief   
Sexual Orientation   
Civil Partnership/ Marriage   
Pregnancy/ Maternity
Page 35

Page 36

4 
Cross cutting
Note: Link to Section 6 below Action Plan 
Section 4: Analysis of positive and Negative Impacts 
Protected Characteristic Positive Impact Negative Impact No
impact
Race 
Sex   
Gender 
Re-assignment   
Disability 
Age 
Religion/ Belief 
Sexual Orientation   
Page 36

Page 37

5 
Civil Partnership/ Marriage; this PC is
not listed as relevant for Specific
Duties; however under the General
Duty we are required to eliminate any
discrimination for this PC. 
Note: Link to Section 6 below Action Plan in terms of addressing  impacts 
Section 5: Addressing impacts
Select which of the following apply (use can choose more than one) and give a brief explanation – to be expanded in
Section 6: Action Plan
1. No major change  
2. Continue the PFD 
3. Adjust the PFD 
4. Stop and remove the PFD 
Page 37

Page 38

6 
Give reasons: 
Note: Link to Section 6 below Action Plan 
Section 6: Action Plan describe action which will be taken following the assessment in order to; reduce or remove any
negative impacts, promote any positive impacts, or gather further information or evidence or further consultation
Action Responsible
person
Intended outcome Date Protected Characteristic    
Disability    
Gender    
Gender Reassignment    
Race    
Age    
Religion/ Belief    
Sexual Orientation    
Civil Partnership/ Marriage    
Pregnancy/ Maternity    
Cross cutting
Are there any negative impacts which cannot be reduced or removed?  please outline the reasons for continuing the PFD 
Page 38

Page 39

7 
Section 7: Monitoring and review
Please detail the arrangements for review and monitoring of the policy
How will the PFD be monitored? 
What equalities monitoring will be put in place? 
When will the PFD be reviewed? 
Is there any procurement involved in this PFD? If
yes please confirm that you have read the WDC
Equality and Diversity guidance on procurement 
Section 8: Signatures
The following signatures are required:
Lead/ Responsible  Officer: Signature: Julie Mc Grogan Date:17/11/21
EIA Trained Officer: Signature: Alan Munro  Date: 17/11/21
Section 9: Follow up action 
Publishing: Forward to community
Planning and Policy for inclusion on
intranet/internet pages
Signature: Date:
Service planning: Link to service
planning/ covalent – update your service
plan/ covalent actions accordingly
Signature: Date:
Give details, insert name and number of covalent action and or related PI: 
Committee Reporting: complete
relevant paragraph on committee report
Signature: Date:
Page 39

Page 40

8 
and provide further information as
necessary
Completed form: completed forms
retained within department and copy
passed to Policy Development Officer
(Equality) within the CPP team
Signature: Date: 
Page 40

Page 41

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Education Officer
Education Services Committee: 28 September 2022
_______________________________________________________________
Subject: Early Learning and Childcare Progress Update
1. Purpose
1.1 This report provides progress made to provide high quality Early Learning and
Childcare (ELC) in West Dunbartonshire Council (WDC).  
2. Recommendations
2.1  It is recommended that Committee notes progress to:
(a) deliver the statutory entitlement of 1140 hours of high quality early learning
and childcare.
3. Background
Framework for High Quality ELC
3.1 The ELC Quality Improvement Framework is designed to support
improvement at our ELC provision. The framework provides self-evaluation
tools which support ELC to measure progress and plan improvement. Specific
self-evaluation tools have been provided to critically reflect on practice and to
specifically evaluate the 1140 hours curriculum offer. 
3.2 Outcomes for our children and families evidenced through their progress in
literacy and numeracy are improving. The skills, knowledge and confidence of
most practitioners and leaders at our ELCs has also improved through our
programme of professional learning. This was evidenced through our ELC
Improvement Framework; verified by external scrutiny from the Care
Inspectorate. Intensive support is provided for staff at some ELC to deliver
high quality ELC; 1140 hours and understanding of the increased
expectations of the policy. Support and training to deliver the extended
children’s day, curriculum, planning and assessment is being provided.
3.3 HM Inspectors of Education will resume their routine programme of
inspections following the pause in March 2020 in response to the COVID-19
pandemic. The quality framework and indicators within How Good Is Our
Early Learning and Childcare? will continue to be used as the focus for
their inspections. 
3.4 The Care Inspectorate have used their new quality framework in their
inspections for day care of children, childminding and  school-aged childcare
services. The framework focuses on children’s wellbeing and sets out the
elements that will help answer key questions about the impact care and
learning is making to outcomes for children. The framework is a self-
ITEM 10
Page 41

Page 42

evaluation tool to help settings self-evaluate their own performance in 
delivering high quality care and learning for children. 
3.5 A national consultation on options to improve and streamline the inspection of 
ELC has been launched. This consultation as a result of Professor Muir’s 
recommendations for education reform in Scotland recommended that there 
should be a shared inspection framework for ELC; a single inspection 
framework which would remove unnecessary burdens and duplication by the 
inspecting bodies. 
3.6 Of our 40 ELC settings (includes 11 partner providers), 10 ELC were 
inspected by the Care Inspectorate between August 2021 and August 2022; 
evaluative grades awarded were good and above. The work to ensure that 
ELCs below good, achieved good and above, can be attributed to expansion 
models and the new structures of leadership in place. Of the 10 inspected 
services: 3 were newly opened ELC managed by a head teacher, 3 ELC were 
re inspected, who were below good at their last inspection, now managed by 
head teachers, three partner providers were also re inspected and there was 
one pilot of a new inspection model. There is evidence of strong improvement 
and quality of provision at the 10 ELC in the sample of inspections last 
session. Published reports provide detailed evidence and answer key 
questions: How good is our care, play and learning? How good is our 
setting? How good is our leadership? and How good is our staff team? 
3.7 Care inspections provided the following evaluations:  
• How good is our care, play and learning? 3 settings were rated good
and 7 rated very good
• How good is our setting? 5 settings were rated good and 5 at very
good
• How good is our leadership? 2 settings were rated good and 8 at very
good 
• How good is our staff team? 3 settings rated good and 7 at very good 
3.8 Early Years officers continue to work closely with the Care Inspectorate to 
support ELC improvement; to develop skills, knowledge and expertise of our 
ELC leadership teams to self-evaluate and plan for improvement. 
4.  Children’s Progress  
4.1  Children are achieving very well in literacy and numeracy. Attainment
progress data shows that children achieved ambitious benchmarks last
session. The early level literacy and numeracy baseline assessment is
benchmarked across the authority to highlight performance levels. It is too
early to say that the increased hours of early learning and childcare is a
contributory factor for the improvement in children’s progress. However, our
ambition through our models of ELC and increased hours is to improve
outcomes for children and to narrow the poverty related attainment gap which
we are on target to do. 
4.2 Attainment progress over time, with the percentage of children achieving 
benchmarks in literacy and numeracy has improved year on year. Literacy 
progress measures in all areas increased in 2022 compared to 2021.
Page 42

Page 43

Although emergent writing data shows a small increase, this was the first time 
that this measure had increased and represents 88% of our children 
achieving. The focus on writing through play in our ELC literacy environments 
has helped to improve this area of children’s skill. The biggest increase of 
17% was Concepts of Print for 2022 compared to 2021 which also shows an 
increase over the time of our data collection, this represents 62% of our 
children. Concepts of print is the main benchmark used to measure children’s 
progress in literacy skills. Children’s daily exposure to high quality 
communication and literacy environments and programmes to develop their 
literacy skills such as Word Aware is what can make the difference to their 
attainment. Overall children have improved knowledge of books, vocabulary, 
writing (early mark making), how words work, ability to hear and produce 
rhyming words recognise letters and sounds and to recite the alphabet. These 
are the early literacy skills necessary before formal reading and writing begins 
at P.1. Although All literacy areas increased in 2022 compared to 2021, it is 
too early to say if the overall improvement is related to 1140 hours. See Table 
1, for literacy attainment in emergent writing and concepts of print at our ELCs 
(there was no data for 2020). 
Table 1: 
All numeracy areas increased in 2022 compared to 2021, except for 
Money which declined by 1% in 2022 compared to 2021. Money is a difficult 
concept for children under five years which requires well developed skills in 
number and number processing. In number and number processes 32% of 
our children achieved a very high benchmark score of 19. Children must 
achieve a score of between 19 - 22 to achieve the benchmark in number and 
number processes. This benchmark was set deliberately high to show 
progress across early level for number and processing skills. 63% of our 
children achieved a score of between 5 -18 in number and number processes
Page 43

Page 44

which is a wide range but shows that children are progressing well in this skill 
area. The biggest increase of 19% was Properties of 2D shapes and 3D 
objects for 2022 compared to 2021. Also, Angle, symmetry and transformation 
increased, 14 % for 2022 compared to 2021. The increase in those two 
measures may be attributed to our Froebel focus on Block Play which can be 
seen at all of our ELCs. See Table 2, for numeracy attainment for the last five 
years at our ELCs, there was no data for 2020). 
Table 2: 
5. Developing the Early Childhood Curriculum 
5.1 The increased hours of attendance at ELC has brought challenges as well as 
opportunities to provide high quality education for our youngest children. The 
600 hours model of ELC provided approximately 3 hour ELC sessions, 
morning and afternoon, for two different  cohorts of 10 children. With the new 
model our ELC teams provide 1140 hours, approximately 6 hours of ELC for 
one cohort of 8 children. The longer hours of attendance, with less children 
requires much more thought and attention to detail to provide curriculum 
delivery indoors and outdoors, a lunch service which promotes independence, 
periods of rest, planning and assessment and an environment for learning 
which responds to children’s stage of learning and development. Built into this 
model is increased time for staff to develop their practice through collegiate 
time. This session collegiate plans will be monitored to ensure that the time 
available is used to prepare and plan for children, provide professional 
learning, plan and assess and, for team meetings 
Page 44

Page 45

5.2 Evidence from improvement visits has highlighted that support is required at a 
small number of ELC to provide the quality that we expect. The key elements 
for high quality provision which we will continue to support and develop are 
leadership, curriculum, environments for learning and developing 
practitioners’  skills and knowledge. A working group has been set up to 
develop curriculum models and rationale for the early  childhood curriculum. 
This group of ELC practitioners will review and evaluate their curriculum, 
make necessary changes and share good practice. This group’s work aligns 
with the ELC professional learning programme. ELC practitioners will also be 
encouraged to attend the professional learning and continuous professional 
learning modules available from the Scottish Government Improvement 
Service which complements the learning programme we have developed for 
ELC to:  
• Support the development and progression of children’s early language
and literacy; 
• Build confidence in identifying and responding to additional support
needs; 
• Track and monitor children’s progress, and develop
• Curriculum rationale.   
5.3 Professional learning and specific groups set up to deliver the high quality 
expected of 1140 hours are linked to our Delivery Plan. An Action Plan has 
been developed to track and monitor progress of specific areas which 
require improvement and support. Opportunities for professional learning 
continue, linked to the national practice guidance Realising the Ambition.
Specific collaborative groups set up to develop 0-3 years practice, 
communication and literacy, One-ery, and outdoor learning will continue to 
meet. In addition a group has been set up to support the development of the 
early childhood curriculum for 1140 hours. The impact on the skills of 
practitioners who do attend professional learning and support groups is 
positive. We encourage all early years practitioners to attend training, we 
schedule training and group meetings after the ELC day which ensures that 
all staff can attend within their core hours of work. The central early years 
team also provide training to individual ELC teams where need has been 
identified. Training attendance records show that attendance is good for most 
ELC teams. Good practice is evident where practitioners are given lead or 
champion roles to develop specific areas of the curriculum. This aspect of 
ELC quality was also commented positively at all recent inspections. 
5.4 The One-ery model  of early level learning, curriculum delivery based on play 
pedagogy and nurturing approaches at P.1 and ELC has been successfully 
delivered and piloted in our campus schools and ELC this session. Progress 
of early level children at the campus schools is measured through their 
literacy and numeracy attainment. Children’s progress is significantly better 
than years prior to the pandemic. 
5.5 An increased number of settings have plans to implement the One-ery 
model this session. Our professional learning programme and forums will 
support education practitioners and leaders as we continue to develop and 
refine the One-ery model of learning approach. 
Page 45

Page 46

6. People Implications 
6.1 As previously reported a high quality, diverse and well-qualified professional 
Workforce is key to delivering the expansion and the quality of ELC. 
6.2 Support is provided for ELC staff teams and leaders identified to support 
delivery of the high quality ELC and increased expectations of 1140 hours 
model of curriculum 
7.  Financial and Procurement Implications 
7.1  As reported previously to ensure that it is protected for investment in early 
learning and childcare, the multi-year funding package for expansion is 
allocated through a specific grant. There are no changes to the multi-year 
funding allocation to this authority; figures are cumulative. The multi-year 
allocations for West Dunbartonshire: 
Financial Year Revenue   Capital    
£m    £m 
2018/19   1.410    0.580 
2019/20   5.268    2.380 
2020/21   8.717    4.480 
2021/22   9.723    5.880 
2022/23  9.485    0.794 
7.2 The outdoor expansion projects at various locations will be completed in the 
next few months. Projects planned for Linnvale ELCC, St. Mary’s Alexandria, 
and Christie Park Primary School are at various stages of implementation see 
details below. Budget has been allocated for projects within existing 
budgeted resources.   
- Linnvale ELCC - planning in place, building warrant and start date
required
- St Mary’s ELCC Alexandria – planning in place, building warrant
and start date required
- Christie Park Primary School – plans have been drawn up. 
8.   Risk Analysis 
8.1  The Key Risks: 
• The quality of ELC at all funded providers to ensure that they meet the
National Standard Criteria.
• Failure to deliver 1140 hours curriculum by confident, well-trained ELC
staff teams.
• Any further delay for the Linnvale ELCC project, which does not comply
with registration requirements, will result in evaluative grading below
good.
• The Christie Park project is required for August 2023 which if delayed
will impact our capacity to deliver the number of ELC placements
required for deferred entry policy. 
Page 46

Page 47

9. Equalities Impact Assessment (EIA) 
9.1  An EIA for the Expansion Plan was undertaken previously. There was no 
requirement to undertake another EIA for the purposes of this report as it is 
providing an update to Committee on the expansion. 
10. Consultation 
10.1  Regular consultation with stakeholders including parents and carers, ELC
staff, Unions, Council partners in the project and partner ELC providers
continues through the various WDC fora and regular meetings. 
10.2  Legal Services and the Section 95 Officer have been consulted in relation to
the content of this report. 
11.  Strategic Assessment 
11.1  This report reflects the Council’s aspiration to have a strong local economy,
improved employment opportunities and efficient and effective frontline
services that improve the everyday lives of residents. These are strategic
priorities for 2017-2022. 
Laura Mason
Chief Education Officer 
Person to Contact:  Kathy Morrison, Senior Education Officer, Education,
Learning and Attainment 
Telephone No: 07813 534420 
Email: kathy.morrison@west-dunbarton.gov.uk 
Background Papers: None   
Wards Affected:  All 
Page 47

Page 48

Page 48

Page 49

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Education Officer
Education Services Committee: 28 September 2022
_______________________________________________________________
Subject: Increase Sustainable Rate paid to Funded Early Learning and
Childcare Providers  
1. Purpose
1.1 This report proposes an increase in the hourly rate paid by West
Dunbartonshire Council to contracted private providers for funded Early
Learning and Childcare (ELC).
2. Recommendations
2.1  It is recommended that Committee:
(a) Agrees to increase the hourly rate paid to ELC private providers
including childminders for the provision of funded ELC from £5.31to
£5.67 for 3 & 4 year olds from 1 August 2022;
(b) Notes the proposed rate increase for the years 2022-23 and 2023-24,
in order that the Council paid rates remain sustainable.
(c) Notes the external factors influencing the sustainability of the hourly
rates paid to contracted providers of funded ELC in West
Dunbartonshire, including rising costs and wages.
3. Background
3.1 Approximately one quarter of children eligible for a funded Early Learning and
Childcare place, access their place in the private sector in West
Dunbartonshire Council. The Council is dependent on these places to fulfil its
statutory duty. Therefore, settings in this sector need to remain financially
viable and the Scottish Government requires Councils to establish and pay a
rate that ensures this sustainability.
3.2  If a sustainable rate is not paid, there is a risk of services in the private sector
closing which would incur capital and revenue costs for the Council, and
would reduce choice and local provision for parents. The closure of services
who also provide childcare which is paid for by the parents would have a
negative impact on the local economy, with parents not being able to access
work or training.
3.3 As a result of continuing concerns regarding financial sustainability by funded
providers, the Scottish Government carried out work to review the
sustainability of the sector and published the Financial Sustainability Health
Check of the Childcare Sector in Scotland, August 2021. The report
highlighted that although Councils work closely with their funded providers to
agree rates in line with the principles of the Sustainable Rates Guidance
(published in April 2019), this report also highlighted that in some areas rates
have not matched expectations of sustainability and inflationary pressures.
The Financial sustainability health check confirmed that a national rate will not
ITEM 11
Page 49

Page 50

be set, stated that a number of local authorities continue to pay £5.31 an hour 
with no credence paid to an inflation uplift which was built into the quantum. 
3.4 To support sustainable rate setting processes, the Scottish Government and 
COSLA commissioned Ipsos MORI to conduct a National Costs Collection 
exercise in early 2022. This is a repeat of the original exercise in 2016 on 
which our current hourly rates are based.   
3.5 The exercise was not intended to produce a national rate. The intention was 
that the data set of the cost of providing ELC at a funded provider could be 
used to help set local sustainable rates for 2022-23. This data should have 
allowed an in-depth review of our hourly rates. However, the West 
Dunbartonshire Council data return from eight out of eleven of our providers 
was considered to be too low to ensure a realistic rate could be set. 
3.6 Within our funding envelope available for ELC, we are expected to uplift rates 
for 2022-23 to ensure that they reflect the costs of delivery (including 
inflationary increases), provide scope for reinvestment which will reflect a 
measure of profit in a private sector setting and enable delivery of the Real 
Living Wage commitment. 
4. Current Position 
4.1  The hourly rate paid by West Dunbartonshire Council to our funded private 
ELC providers, including childminders, to deliver an hour of funded ELC to 3-5 
year olds has increased from £3.68 per hour in 2017-18 to £5.31 per hour in 
2021-22. The hourly rate for eligible 2 year olds was increased for the very 
small number of children (just under 50)  at our  partner providers from April 
2022 to £5.84. The increase reflected the higher staff ratio required for this 
age group and the rates paid by other Councils. 
4.2 The current hourly rate that West Dunbartonshire Council pays does not 
represent all of the other benefits of the partnership arrangement which we 
have with funded providers.  The benefits include free access to all 
professional learning, working groups and annual mandatory training, leaders’ 
meetings, partner provider meetings, early stages teacher allocated resource 
0.2/0.1 FTE, link named psychologist, support from the central Early Years 
team,  preparation for inspection, sharing of all guidance developed to support 
staff and access to workforce development budget. 
4.3 Improving outcomes for children and reducing the attainment gap is at the 
heart of ELC provision. Therefore, as well as meeting the requirements of the 
National Standard to pay staff the real Living Wage, settings in the private 
sector need to be able to recruit and retain staff, support staff training and 
invest in their services. Commitment to an increase would provide 
reassurance to providers, protect jobs and enable providers invest in their 
services and to put effective business plans into place. The Scottish 
Government requires Councils to establish and pay a rate that ensures this 
sustainability. 
5.  People Implications 
5.1 A significant number of families in West Dunbartonshire Council access ELC 
at private providers. This equates to one quarter of children accessing ELC in 
the Council area at any time. Parents and carers rely on funded providers of
Page 50

Page 51

their choice, to provide childcare as well as funded provision to enable them
to access work and training. If providers cease to be sustainable, there would
be significant work and resource required to increase the number of local
authority places to ensure that the Council meets its statutory duty.  
6. Financial Implications
6.1 The hourly rate paid has increased over time to achieve the rate of £5.31 for 3
and 4 year olds and £5.84 for 2 year olds. 
6.2 When the 2022/23 budget was set along with the indicative 2023/24 and
2024/25 budgets there was no allowance for an increase in partner provider
rates therefore any increase in the hourly rate paid will be funded from ELC
expansion budget. This will avoid any cost to core budgets or to reserves if we
fund any increase from expansion. This means that our current expansion
plans will need to be revised. 
6.3 Based on the rate increase to £5.67 being fully funded through expansion
means £197k is required from future year’s budgets. The amount required
£127k, for 2022-23 can be accommodated. Going forward there are a number
of budget pressures which will arise in 2022-23 which will have a knock-on
effect in future years, in particular the additional increase over and above the
already 2% calculated for pay inflation and considerably increased utilities
inflation.  As the expansion budget is the source of permanent funding for the
partner providers rate increase, this budget will come under severe pressure
and any future deficit balances resulting from the increased rate and inflation
would require a revisit of the expansion budget allocation.  
6.4 If the increased rate is agreed it will be set for the next few years. The rate of
£5.67 per hour per child represents an uplift on the current rate of 6.78%. The
proposed increase brings us in line with the lower end of West Partnership
proposed hourly rates. The hourly increase does not include £3.00 for food
which is an additional 10p per hour. This hourly rate proposal captures the
increase in the Scottish Living Wage since 2021 as well as an element for any
increase this year. This also represents a 2% uplift for reinvestment within
each setting. This does not include the Scottish Milk and Healthy Snack
payment of 58.2p which is paid separately for every eligible child each day
they come to their early learning and childcare setting. 
6.5 The 2022/23 budget for commissioned places for 3 and 4 year olds was
based on a rate of £5.31. An increase in the rate to £5.67, backdated to 1
August 2022, will cost approx. £127k in 2022/23 and approx. £197k for a full
12 months. The ELC specific grant for food covers the cost of 10p per hour or
£3.00 per day. Table 1 shows the impact on the budget of this proposed rate.
Table 1
Current
Allocated
Budget
2022/23
Additional
Budget
August - March
2022/23
Additional
Budget
August - July
2022/23
Additional
Budget
August - July
2023/24
£2,815,379  £127,000  £197,000
£197,000
Page 51

Page 52

The impact on monthly payments, if the hourly rate of £5.67 was applied to 
payments made to funded providers in an average month is exemplified at 
table 2. This represents an increase of £17,829.97 per month at the busiest 
time of year (June). Note: the example provides payments made for eligible 2 
year olds, 3 and 4 year olds and cross boundary payments in June 2022. 
Payments fluctuate throughout any financial year as numbers of children 
leave and join ELCs. 
Table 2 
Funded Providers
Monthly Payment
With 6.78%
increase applied
(£5.67 per hour)
Brookland 27,354.47  29,209.10
Carousel Nursery, Alexandria 23,433.02  25,021.78
Carousel Nursery, Dumbarton 36,768.05  39,260.92
Children's Hour Nursery 17,830.45  19,039.35
Great Start Nursery 14,940.31  15,953.26
Lucky Little Stars 27,186.73  29,029.99
Nursery Times by the River  33,041.61  35,281.83
Sunflower Nursery 38,535.90  41,148.63
Tots R Us Clydebank 15,096.52  16,120.06
Tots R Us Dumbarton 15,445.30  16,492.49
Villa Kindergarten 13,346.57  14,251.47  
TOTAL PAID: £262,978.93  £280808.90 
7.   Risk Analysis 
7.1 The Key Risks: 
If the Council does not increase the hourly rate to a level that enables 
providers in the private and voluntary sectors to be sustainable, there is the 
risk that: 
• There will be insufficient places in West Dunbartonshire Council to 
enable parents to access their children’s funded ELC entitlement which 
will incur additional cost for the Council as it will need to expand 
existing services and/or open new services; 
• There will be a risk to the policy of Funding Follows the Child which is 
part of the National Standard and fulfilling the statutory duty;  Page 52

Page 53

• There may be reputational damage to the Council if services close due
to not being sustainable, leading to loss of local provision, choice and
flexibility for families, loss of employment and community based
services;
• Providers in the private and voluntary sector may not be able to recruit
and retain staff or meet the National Standard, if they are not able to
pay the Real Living Wage;
• Potential reduction in the quality of service provided if qualified and
experienced staff cannot be recruited.
8. Equalities Impact Assessment (EIA)
8.1 An Equalities Impact Assessment has not been undertaken for this report.
The proposal to increase the hourly rates for funded ELC has no negative
impact on people with protected characteristics but has the potential to impact
positively on the ELC workforce, which is predominantly female.
9. Consultation
9.1 Regular consultation with funded providers.
9.2 Legal Services and the Section 95 Officer have been consulted in relation to
the content of this report.
10. Strategic Assessment
10.1 This report reflects the Council’s aspiration that all West Dunbartonshire
children have the best start in life and are ready to succeed. Families are
supported in accessing education, learning and attainment opportunities and
improved life chances for all children, young people and families.
Laura Mason
Chief Education Officer
Person to Contact: Kathy Morrison, Senior Education Officer, Education,
Learning and Attainment
Telephone No: 07813 534420
Email: kathy.morrison@west-dunbarton.gov.uk 
Background Papers: Sustainable Rates Guidance
Financial Sustainability Health Check
Funding Follows the Child and the National Standard  for
ELC Providers: Interim Guidance
Ipsos National Cost Collection Report
Wards Affected: All
Page 53

Page 54

Page 54

Page 55

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Education Officer
Educational Services Committee: 28 September 2022
___________________________________________________________________
Subject: Literacy and Numeracy - Benchmarking
1. Purpose
1.1 This report advises the Educational Services Committee on the attainment
progress and performance of the Strategy to Raise Attainment and
Achievement in West Dunbartonshire at Early Years, P1, P4, P7 and S3 in
academic session 2021/2022
2. Recommendations
2.1 It is recommended that Committee reviews the performance analysis and
notes progress made in academic session 2021/22 to raise attainment and
tackle the poverty related attainment gap.
3. Background
3.1 Information contained in this report is based on Educational Service’s analysis
of West Dunbartonshire’s Achievement of Curriculum for Excellence Levels
(ACEL) in literacy and numeracy at P1, P4, P7 and S3 in academic session
2021/2022 compared to 2020/2021; and West Dunbartonshire’s Early Years’
Literacy and Numeracy Attainment Baseline.
3.2  Achievement of Curriculum for Excellence Levels are collected by Scottish
Government in June each year as an aspect of the National Improvement
Framework Reporting and Monitoring programme. At December 2022
Scottish Government will publish a national ACEL statistical report on
attainment across all local authorities in academic session 2021/22. The
ACEL attainment presented in this report data is draft until ratified by Scottish
Government in the report being published in December 2022.
3.3 Attainment data for children in Early Learning and Childcare Centres’ and in
P1 is collected annually by West Dunbartonshire using locally developed
literacy and numeracy baseline assessments. The early level baseline
assessment is benchmarked across the authority to highlight performance
levels. This was suspended in 2020 due to the pandemic.
3.4 In session 2020 Scottish Government suspended the ACEL collection due to
the pandemic.  In 2021 the ACEL collection resumed at P1,P4, P7 ; and was
suspended at S3 due to  concerns raised regarding pressures secondary
schools were facing with the new Alternative Model of Certification
ITEM 12
Page 55

Page 56

arrangements. Therefore, June 2022 is the first time in three years that
attainment in literacy and numeracy attainment at S3 has been gathered
locally and nationally. 
3.5 A report will be presented to Education Committee in March 2023 following
the publication of the national statistical analysis of attainment at P1,P4, P7
and S3 in December 2022.   
3.6 On 14 December 2021 Scottish Government published data on literacy and
numeracy levels which confirmed a decrease in attainment in Scotland and a
widening of the attainment gap between pupils from the most and least
deprived areas of Scotland had widened. This negative impact is attributed to
the disruption caused by the pandemic. The results analysis for West
Dunbartonshire mirrored the national data in session 2020/21. 
3.7 An Education Improvement  and Attainment  Action Plan ( Appendix 1)
implemented in  academic  session 2021/22 successfully delivered
improvements in the attainment for pupils in both ELC and primary; with a
slight dip in attainment evident in the attainment levels at S3. This action plan
is being extended into sessions 2022/2023 and 2023/2024 with the aim of
providing enhanced and targeted interventions; before and after school
learning provision for those requiring support; providing additional teaching
resource to support literacy and numeracy attainment; and provide supported
study. Schools identify those requiring bespoke targeted recovery support
through a forensic analysis of pupil attainment, achievement  and rate of
progress. 
3.8  This report provides analysis of attainment data at ELC, P1, P4, P7 and S3 for
academic session 2021/22 providing information about: 
• West Dunbartonshire’s performance in literacy and numeracy attainment
in 2021/22 compared to 2020/21; 
• the percentage of pupils who achieved the expected ACEL level for their
age and stage at P1, P4, P7 and S3 by June 2022; and
• the attainment of pupils in each of the social indicators of multiple
deprivation in session 2021/ 2022 compared to 2020/21. 
4. Main Issues 
4.1  Attainment in Early Learning and Childcare and Primary 1 Session 2021/222 
4.1.1  Percentage of children in our Early Learning and Childcare Centres achieving
the benchmark score increased for literacy (concepts of print) and numeracy
(number and number processes) in 2021/22 compared to 2020/21 (Table 1): 
• Literacy increased by 17 % from 45 % in 2020/21 to 62 % in 2021/22
• Numeracy increased by 10 % from 20 % in 2020/21 to 30 % in 2021/22
Page 56

Page 57

Table 1 
4.1.2  The results in Table 2 compare attainment in the West Dunbartonshire
Baseline Assessments at Primary 1 in 2021/2022 to session 2020/2021.
Compared to session 2020/2021 there is  slight decrease in the percentage of
children in Primary 1 achieving the benchmark score in  literacy (phoneme
blending);  and  an increase in  the percentage of children in Primary 1
achieving the benchmark score in  numeracy (number and number
processes)  in session 2021/2022: 
• Literacy decreased by 2 % from 75 % in 2020/21 to 73 % in 2021/22
• Numeracy increased by 3 % from 77 % in 2020/21 to 80 % in 2021/22 
Table 2 
Page 57

Page 58

4.2  Attainment in Primary Schools 2021/2022 
4.2.1 Attainment in primary schools improved at all stages and organisers 
(reading, writing and numeracy) in session 2021/2022 
4.2.2 The percentage of primary pupils achieving the level for their age and stage
increased for all organisers (reading, writing, numeracy) in 2021/22  
compared to 2020/21 (Table 3): 
Table 3 
• literacy attainment increased by 9 % from 62 % in 2020/21 to 71 % in
2021/22 
• numeracy attainment increased by 6 % from 72 % in 2020/21 to 78 % in
2021/22
• the largest increase in attainment is at P4 with a 13 % increase in writing
attainment from 60 % in 2020/21 to 73 % in 2021/22; and 9 % increase in
P4 numeracy attainment, from 67 % in 2020/21 to 76 % in 2021/22. 
4.2.3   The West Dunbartonshire attainment performance for primary in 2021/22 in
reading, writing, and numeracy has steadily increased since 2017 with the
exception of 2021 due to the pandemic (Table 4): 
Page 58

Page 59

Table 4 
The attainment in primary schools in academic year 2021/2022 compared to
2017 shows an increase of 5% in reading; 8% in writing; and 6% in numeracy. 
4.2.4 In session 2021/2022 the attainment gap narrowed between children in our
most deprived areas Quintile 1 and children in our least deprived areas
Quintile 4 (Table 5), (Table 6): 
Table 5 
WDC - Gap over time
Quintile 1 - Quintile 4
Literacy 
(percentage point*
difference)
Numeracy 
(percentage point
difference)
Stage/Level 2020/21 2021/22 2020/21 2021/22
P1 - Early Level 25 10 18 16
P4 - First Level 24 17 28 18
P7 - Second Level 14 18 14 12
P1, P4 and P7
combined 21 15 20 16
* pp = percentage points, i.e. the number of percentages points (pp) difference between Quintile 1 and Quintile 4 
• The attainment gap narrowed across primary for literacy and numeracy
by 6 pp and 4 pp respectively.
• The reduction in attainment gap is evident at all stages for literacy and
numeracy at primary, expect for P7 literacy, which shows an increased
gap of 4 pp   
Page 59

Page 60

Table 6
4.2.5 In literacy 91 % of primary schools maintained, or improved, their performance
from 2020/21 to 2021/22; and 9 % of primary schools showed a reduction in
performance from 2020/21 to 2021/22. In numeracy 81 % of primary schools
maintained or improved performance from 2020/21 to 2021/22; and 19 % of
primary schools showed a reduction in performance from 2020/21 to 2021/22.
4.3 Attainment in Secondary Schools 2021/22
4.3.1 Percentage of secondary pupils at S3 achieving Curriculum for Excellence
Levels decreased for all organisers (reading, writing, numeracy) in 2021/22
compared to 2018/19. However the decrease is very small (Table 7):
Table 7
• Literacy decreased by 1 % to 82 % for secondary.
• Numeracy decreased by 2 % to 88 % for secondary.
Page 60

Page 61

4.3.2 Percentage of secondary pupils achieving levels has changed very little in
2021/22 for both most and least deprived pupils compared to 2018/19, apart
from for the least deprived pupils in numeracy. 
4.3.3  The attainment gap narrowed between children in our most deprived areas   
Quintile 1 and children in our least deprived areas Quintile 4 in session
2021/22 for numeracy but increased slightly for literacy (Table 8): 
Table 8 
WDC - Gap over time
Quintile 1 - Quintile 4
Literacy 
(pp difference)
Numeracy 
(pp difference)
Stage/Level 2019/20 2021/22 2019/20 2021/22
S3 - Third Level+ 14 15 13 5 
• The attainment gap narrowed across secondary for numeracy by 8 pp but
increased for literacy by 1 pp. 
4.3.4  In literacy and numeracy 40 % of secondary schools maintained, or improved, 
their performance from 2020/21 to 2021/22; and 60 % of secondary schools
showed a reduction in performance from 2020/21 to 2021/22. 
5. People Implications 
5.1 Funding from the Education Recovery Budget and Scottish Attainment
Challenge has provided additional teaching staff focusing on providing
attainment interventions. Detail is provided in the Strategy to Raise
Attainment and Achievement presented to Committee on September 28,
2022. 
6. Financial and Procurement Implications 
6.1 Since its inception in 2015/16 to March 2022 the Council will have received
£12,642,432 in funding. Attainment Challenge allocations to the Council have
been £2,043,815 in both 2020/21 and 2021/22. Funding in 2022/23 has been
confirmed to be £1,745,797 which is a reduction of £298,018 in 2022/23. 
6.2 The Education Improvement and Attainment  Plan at Appendix 1 is part
funded from Education’s Budget related to COVID flexibilities. 
7. Risk Analysis 
7.1 The reduced funding model coupled with the current context of the pandemic
increases risk of a negative impact on priorities to reduce inequalities and
improve outcomes for all learners in our communities. 
7.2 The additional Education Improvement and Attainment Plan and Funding are
helping to mitigate against the negative impacts of the pandemic.
Page 61

Page 62

8. Equalities Impact Assessment (EIA)
8.1 A full Equality Impact Assessment has been completed and has identified the
decrease in funding will limit ELA’s strategic ability to deliver and progress a
range of functions within the raising attainment agenda. These include, but
are not limited to scrutiny and challenge teams, resources to support out of
hours and holiday learning as well as access to wellbeing support for parents.
Scope exists to mitigate the adverse impact on pupils, however this requires
adaptations across key service areas through the modification of plans to
reflect the reduction in Scottish Government Funding.
9. Consultation
9.1 Legal Services and the Section 95 Officer have been consulted in relation to
the content of this report.
10. Strategic Assessment
10.1 This report reflects the Councils 2017-2022 overarching priority to reduce
inequalities for the people of West Dunbartonshire which supports improved
outcomes for all learners in our community.
____________________________________
Laura Mason
Chief Education Officer
Person to Contact: Julie Mc Grogan, Senior Education Officer, 16 Church
Street, Dumbarton G82 3PU, e-mail
julie.mcgrogan@west-dunbarton.gov.uk 
Appendices:  Appendix 1 – Action Plan for Improvement and Recovery
Background Papers: None
Wards Affected: All
Page 62

Page 63

West Dunbartonshire Council
Educational Services
Education Improvement and Attainment Plan 2022-2024  -  Action Plan
Outcome for
improvement
EXCELLENCE AND EQUITY
Recovery Objective :To improve the impact of interventions designed to close the poverty related
attainment gap
Action required Timeline Personnel Reporting
Identify ELC /schools whose
interventions have closed the gap
July – August 2022 Excellence Equity Data Officer
Senior Education Officers 
School Improvement Team Review
Meeting
Share effective practice with
ELCschools identified as
underperforming
August – October 2022 Lead Officer School Improvement
Education Officers School
Improvement  
School Improvement Headteachers
Senior Education Officers 
Education Officers School
Improvement  
School Improvement Headteachers
Plan / Conduct  regular cycle of
monitoring visits to review progress
with interventions to support raised
attainment and narrowing of
attainment gap
August 2022 – March 2023 Senior Education Officers 
Education Officers School
Improvement  
School Improvement Headteachers
Termly School Improvement
Milestone Reports
Outcome for
improvement
ATTAINMENT AND ACHIEVEMENT
Recovery Objective: To improve the levels of ACEL attainment
Action required Timeline Personnel Reporting
Produce individualised statistical
report for each school
June – August 2022 Excellence Equity Data Officer Educational Services Project Board
( twice per term)
Areas of underperformance
identified and targets for attainment
an equity gap set for 2023 for West
Dunbartonshire and individual
schools and ELC’s 
August 2022 Lead Officer School Improvement
Education Officers School
Improvement  
Educational Services Project Board
( twice per term)
Plan and deliver supported
attainment improvement programme
August 2022 – March 2023 Lead Officer School Improvement
Education Officers School
Improvement  
School Improvement Headteachers
Termly School Improvement
Milestone Reports 
Agree level of support/intervention
required for HT’s in the identified
schools
August 2022 ( on going ) Senior Education Officers Educational Services Project Board
( twice per term)
Appendix 1
Page 63

Page 64

Produce termly scrutiny and
progress reports 
August 2022  – June 2023 Education Officers School
Improvement  
Educational Services Project Board 
( twice per term) 
Page 64

Page 65

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Education Officer
Educational Services Committee: 28th September 2022
Subject: Summer Holiday 2022 Programme Evaluation
1. Purpose
1.1 The purpose of this report is to:
Inform and update members on the additional Scottish Government
funding allocations, the governance of funding and impact of
projects.
2. Recommendations
2.1 The Educational Services Committee is recommended to note:
(a) Progress and impact of authority wide plans by partners to reduce
holiday hunger and provide childcare provision and;
(b) Ways in which the fund has been administered and governed.
3. Background
3.1 In 2019 Council agreed the Holiday Hunger Fund to ensure the
provision of meals and social activities for school children over holiday
periods, throughout West Dunbartonshire. £100,000 per annum was
committed until 2023 to enable community partners to work together to
address the challenges of holiday hunger and associated increased
costs for families.  This has proved successful and uptake and
partnership working has been effective in meeting the needs of our
children and families over holidays.
3.2 Building upon their response to the pandemic, Scottish Government
(SG) allocated an additional £256, 000 to develop the 2022 holiday
programmes.  The guidance required multi-agency planning and
implementation to ensure it supported the intended cohorts of
children, young people and families.  It aimed to help them continue in
work, training and education with access to childcare support tailored
to suit their needs. Guidance and funding supported Councils to
transition programmes from holiday support to wrap-around childcare
support, with this year being a bridge between both. This is in line with
SG Childcare Expansion Plans. (App.1 Summer 2022 Guidance)
3.3  Eighty-five percent of funding was allocated to identified targeted
ITEM 13
Page 65

Page 66

groups with the remaining fifteen percent determined with local
discretion. The following groups were identified as being eligible for
targeted support: 
• Children from those priority family groups identified in the Tackling Child
Poverty Delivery Plan: larger families; families with a disabled child or
adult; young mothers; families with children under one; and minority
ethnic families.  Our additional focus was on Young Carers and care
experienced children and young people. 
3.4 In line with the guidance, Officers undertook liaison and planning  with
families, established Holiday Hunger partners and local childcare providers
who all delivered support. 
4. Main Issues 
4.1  It is recognised that holiday periods add to the stress of poverty for
families and result in less access to food and social activity for them
than their peers.  Resultantly, every summer session planned offered
free access to activities and lunch or snacks as an integral feature. 
4.2   A three pronged approach to planning was undertaken. A childcare
programme was implemented which supported 1500 children and
young people to access care from 9 partner providers.  This support
was targeted in collaboration with parents, partners and schools to
ensure those who needed it most were able to access it. Our
successful community partners’ programme SHINE ensured
approximately 10000 places were available for children and young
people across the Council to access a range of activities delivered by
18 partners.  The final strand, the ASN programme ensured all of the
children in our severe and complex settings were able to access 2
days per week of holiday fun with transport provided over a four week
holiday period. Planning with a range of partners to meet the needs of
particular cohorts of children ensured effective and fun activities.  The
camp was staffed by familiar staff who were trained in providing
additional support and personal care. 
4.3 To ensure appropriateness of spend and scrutiny of projects, Officers
visited projects over the holiday period. They monitored the value for
spend, procedures in place, numbers attending and spoke with staff,
children, young people and families when they could.  At time of writing,
evaluations from partners are being collected and analysed.  These will
inform next steps. 
4.4 Noteable examples of support and highlights of the programmes
supported are: 
• Support was provided to a family of 4 children under 9 who were
taken into emergency care.  This ensured carers could maintain the
Page 66

Page 67

placements and the family were provided with fun childcare activities; 
• 1,910 children and their families engaged in a range of family fun
events in Golden Friendship’s Halls. 3 sessions a week were
offered including breakfast and a packed lunch.  They played party
games and were entertained by a range of magicians, puppeteers
and entertainers.  Attendees included targeted vulnerable families.
Organisers noted that families welcomed the opportunity for free
activities bringing children together over the holidays. Breakfasts
and lunches were particularly welcomed during the current cost of
living crisis. 
• Clifftop Projects were able to employ 3 local freelance artists to
support the 205 children who took part in a full week of creative
arts activities including inventions and a ‘Dragons Den’. Feedback
from children and parents was overwhelmingly positive. 
• ISARO’S summer programme brought together over 40 children from
various backgrounds, supporting them to make new connections
including children from Syrian families and new Afghan families. 
• Vale of Leven Football Academy (VOLFA) took part in the summer
programme for the first time, offering a week long football camp for
boys and girls. 100 local children took part including 7 targeted
families. The camp was at full capacity throughout the week and
VOLFA volunteers were delighted with the results. 
• Rock Community Church offered a range of activities and meals at
The Phoenix four weeks during the summer. Attendance was
1,831 way above their estimates with feedback from children and
parents hugely positive. 
• Bellsmyre Digital Community ran a unique programme of extremely
popular virtual reality gaming sessions and 3d printing workshops
for over 200 children and young people. 
• Flourishing Faifley has established a community garden and
engaged with 30 local families during the summer providing
lunches along with outdoor arts and crafts, including making bird
houses and local wildlife activities such as bug hunts. 
• Families of the 531 children enjoyed packed lunches and
participated in a range of a wide range of activities, games, sports,
arts & crafts, outdoor and indoor play at Bellsmyre Cutty Sark.  
• Funding supported YSort-It to coordinate a  6 week summer programme
attracting 1,098 attendees. The activities includes 37 trips for young
Page 67

Page 68

people, a Friday night Youth Café, 7 youth clubs per week and a 2 day
camping  trip at a festival dedicated to Young Carers. 
• A child in the care of his grandparents accessed full-time childcare when
his grandfather died suddenly. The grandmother has subsequently been
in touch to thank Council for the ‘invaluable support’;  
4.5   Evaluation feedback has been very positive from parents, carers and
children and young people.  At time of writing, the evaluation period is still
open, however, initial feedback shows:
93.3% of parents said their child/children enjoyed all or most of the activities
or child care. (85% enjoyed all activities)
98.3% of parent rated activities or child care as very-good or good. (83.3%
rated very-good) 
90% of parents felt activities met all or most of their child/children’s needs.
95% of parents rated the breakfasts or lunches as very good or good. 
95% of parents said that activities/child care was near or fairly near to
home. 
95% of parents felt they themselves benefitted from their child’s
participation in activities/child care with 80% saying it gave them time free
or time to work/study. 
Additional Comments from parents: 
Positive:
******** attended gaming and 3d printing. He has Asperger's and ADHD, he really
enjoyed attending these clubs and would love to go back to them. ******** and
******* attended goalzone and loved going to it, they spoke about their lunches and
trying new stuff plus they got on lots of outings from going to the local park to the
safari park which was great. 
The multi sports camp held at SPTA was great. ******* thoroughly enjoyed the
multi camps, she said it was great fun hanging out. Coaches were fantastic, shout
out to Tommy, Clair, Erin, Declan and all the other coaches and big thank you for
the sports camps being fun. 
Kathleen who ran the 3D printing club and gaming club in Dumbarton was lovely.
Very friendly and made my daughter feel very welcome. My daughter loved the
clubs, she enjoyed meeting new friends and being able to do things in the
holidays. Thank you 
The staff at Studio2 in Dumbarton are absolutely amazing and I'm so glad they are
so close to my home and provide an excellent after school care service. I cannot
recommend them highly enough 
******* had a great time, better than previous years which made my break even
better. My only wish is she gets to do it again thanks *********(grandad) 
Page 68

Page 69

******* loved being at the childcare in Duntocher, the staff were really lovely. They
made his time fun and enjoyable. 
I wanted to thank you so much for everything you did and gave to our children
during the summer holidays 
4.6 Next steps include planning for October and Christmas school holidays in 
session 2021-2022 and thereafter session 2022-2023. This will involve
meeting a range of WDC and third sector partners to feedback and evaluate
progress and learning so far and further coordinate offers and sessions;
taking due cognisance of feedback from all stakeholders and revisions to
SG guidance. 
5. People Implications 
5.1 There are no people implications as a result of this report, however, these
outcome focused plans aim to improve the life chances of children and young
people  
6. Financial and Procurement Implications 
6.1 All activities related to the implementation of this policy are contained 
within the SG Summer22 Funding and WDC Holiday Hunger          
Fund. 
6.2 Final costs are still being clarified.  It is anticipated the SHINE cost will be
approximately £77 000. There are additional plans for spend in the October 
and Christmas school holiday periods.  Final figures will be clearer 
when the summer invoicing is completed.  
7 Risk Analysis 
7.1      If the Council is unable to ensure positive outcomes for children, we will not be
meeting their needs (Children and Young People Act 2014) (Equalities Act  
2010) 
7.2 If the Council is unable to ensure positive outcomes for all children and 
young people, it could result in reputational damage. 
8 Equalities Impact Assessment (EIA) 
8.1 This fund and governance enhance the quality of the service provided to
all children and young people and therefore can be seen to have a
positive impact in terms of the equalities.  
9 Environmental Sustainability
Page 69

Page 70

9.1 There are no environmental implications as a result of this report.
10 Consultation
10.1 Legal Services and the Section 95 Officer have been consulted in relation to
the content of this report.  
11. Strategic Assessment
11.1 This report reflects the Council’s aspiration to reduce inequalities for
the people of West Dunbartonshire.
Laura Mason
Chief Education Officer
Person to Contact: Claire Cusick– Senior Education Officer
16 Church Street, Dumbarton, G82
claire.cusick@west-dunbarton.gov.uk Tel
01389 737304
Appendices: Appendix 1 – Summer 2022 Guidance
Background papers:  Holiday Hunger Report - Education Committee 5th June 2019
Wards Affected: All wards
Page 70

Page 71

Summer Holiday Food and Childcare Programme – Guidance for Local
Authorities 
Purpose
£10 million in additional funding has been allocated to Local Authorities for the
targeted provision of a summer 2022 holiday programme offering coordinated
access to activities, childcare and food for children age 5-14 from low income
families.
The purpose of this guidance is to help Local Authorities and any commissioned
partners understand how this funding can be used, expected outcomes, and high-
level expectations for reporting. 
Any further questions, please contact holidayfoodandchildcare@gov.scot.
Why the funding has been provided
Transforming the system of school age childcare and expanding provision of meals
to include the school holidays are key ministerial priorities set out in the Programme
for Government and Covid Recovery Strategy. 
Ministers have committed to: make holiday childcare provision available to all
children from low-income families by 2023, starting with delivery of a summer
2022 offer to provide coordinated access to food, childcare and activities
during the school holidays. 
Local Authorities across Scotland have been allocated funding to augment existing
summer holiday provision within their area, or where there is no existing provision, to
initiate the creation of services. These services should enhance equity by widening
opportunities for children from low income families to play, socialise, get active and
access a range of activities that broaden their experiences, supplement their learning
and deliver positive outcomes, integrating food provision wherever possible.
The expectation is that within each local authority area there will be a mix of holiday
provision making best use of existing cross-sectoral capacity, including regulated
and unregulated childcare services that offer flexibility and choice to families and
respond to their needs. Services will vary across and within authorities, with an
expected focus on coordinated services in areas with higher SIMD ratings. 
Childcare and activities provision may incorporate partners from across a range of
sectors, whether regulated or unregulated by the Care Inspectorate, such as local
authority providers, Out of School care providers; youth work; third sector
organisations and activity-based clubs providing activities in the school holidays
(whose primary function is not childcare). Local Authorities should make best use of
existing provision and capacity within their area, working in partnership across
sectors where practicable to plan, coordinate and deliver innovative models of
holiday provision.
Appendix 1
Page 71

Page 72

The aim is to deliver integrated, flexible and accessible services that meet the needs
of children age 5-14 from low income families, removing barriers to access which are
context-specific, and shaped by issues such as geographical location, income level,
family support, access to transport and the additional support needs of children.
Childcare or activities should also be integrated with food and wider family support
where possible for households particularly adversely impacted by poverty, as defined
by this guidance.
Summer programmes should also be rights-based and reflect the diverse needs and
aspirations of children and their families. Activities and childcare provision can be
delivered through various language mediums and should reflect participants’ needs,
this includes offering sessions in Gaelic medium or other widely-spoken minority
languages where appropriate. Improving the physical, emotional, and mental
wellbeing of children and young people is key, as is making sure children and young
people’s views are listened to and actively inform the planning and delivery of the
holiday programme as well as future policy. 
Who the funding is intended to reach
This investment aligns with the national mission to tackle child poverty. It also
complements wider investment in school aged childcare and free school meal
replacements for eligible families based on low income, and wider investment in
education recovery. 
The funding is aimed at school age children age 5-14 from low income households.
Around 9 in 10 children living in poverty are from households with one or more of the
priority family characteristics identified in the Tackling Child Poverty Delivery Plan,
therefore 85% of this funding is intended to be targeted at children and young people
from the priority family groups below:
 Children from lone parent families
 Children from ethnic minority families
 Children from families with a disabled adult or child
 Children from families with a young mother (under 25)
 Children from families with a child under 1 year old
Children from larger families (3+ children)
Children from these family types are most likely to experience continued poverty-
related and other structural disadvantage. Consideration should be given to how the
offer can be designed and delivered in such a way that these households are able to
benefit from provision on offer – for example by ensuring provision is accessible to
disabled parents and children. The remaining 15% of the funding can be used
flexibly to reach other children, including under-fives and older children, who would
benefit from access to free holiday childcare, food and activities and will be
determined at local level. Local discretion could include, but is not limited to:
 Children from other low income families
 Care experienced children and young people
 Young carers
Page 72

Page 73

 Children in need of protection
 Children supported by a child’s plan
 Children with ASN
 Children who have undergone significant transitions, for example, starting in
ELC, primary or secondary school
The needs of these target groups, their views and priorities, should be considered
when planning and delivering summer holiday provision to ensure services are
inclusive, accessible and responsive to local needs across different language
mediums, in collaboration with Local Child Poverty leads where practicable to align
strategic approaches.
Partners should also work together to agree how activities and services can be
delivered in remote or rural areas, where the range of existing provision might be
more limited and geographic barriers to access services may be considerable.
Underpinning principles
The driver diagram included at Annex A illustrates intended programme aims and
outcomes. It is designed to help guide partners through design and delivery of
services in order to identify what specific local action can be taken to help maximise
the impact of this funding and improve the wellbeing of eligible children and young
people.
The 2022 Summer Holiday Programme should be viewed as a bridge between the
2021 Get Into Summer offer and future holiday provision, aligned with wider school
age childcare expansion. It should retain what worked well last year while beginning
to embed new practices to test the changes required to aid development of a year-
round system of School Age Childcare and meals provision by the end of this
parliament.
Emphasis is on a rights based, stigma-free approach, shaped by what children,
young people and their families tell us, aligned with GIRFEC. This should build on
what currently exists - enhancing and co-ordinating services and assets locally and
nationally - in partnership.
Local authorities should ensure the organisations they work with have appropriate
processes for safeguarding, child protection and data protection in relation to
employees, volunteers and the people they are supporting. Where there are new
pilots, work should start quickly to ensure staff and volunteers undergo disclosure
checks, child protection and children’s rights training
Focus for summer 2022 should be on:
 Establishing effective local partnerships that work across all sectors to plan
and deliver a holiday programme that coordinates and integrates childcare,
activities and food. That promotes inclusion and aims to remove barriers to
participation and is responsive to the needs of eligible children and families,
making best use of existing provision at local level.
Page 73

Page 74

 Developing effective and non-stigmatising approaches to targeting.
Examples include ensuring language used in communications is inclusive; forging
relationships with trusted community/faith leaders to promote maximum
engagement, reach, and uptake amongst eligible groups; engaging trusted
referral partners such as schools and relevant professionals to identify eligible
children and families and communicate the offer to them; or offering funded
places for eligible children and young people alongside paid-for places available
to all to eliminate stigma.
 Communication and promotion of the summer offer should be coordinated
locally in order to maximise engagement among target groups. The Scottish
Government is committed to inclusive, non-stigmatising communication -
language, cultural differences and levels of digital literacy should all be
considered.
 Overcoming barriers to participation - consideration should be given to how to
meet wider family needs and lower costs of participating in the programme,
including through transport, food provision, financial inclusion, family support and
referral on to wider services where needed. Principles of dignity and human rights
should be applied, promoting non-stigmatising provision of services, and
supporting inclusive service delivery, for example through cultural or linguistic
inclusivity. Local authorities should be responsive to the particular needs of their
communities, for instance by offering sessions in Gaelic medium or other widely-
spoken minority languages as well as English where appropriate.
 Taking a place-based approach to delivery that targets areas of multiple
deprivation within each local authority area. This is to concentrate funding in
areas that have the highest rates of poverty and begin to embed tests of change
that will generate the learning required to develop holiday provision for low-
income families from 2023 onwards
 Integrating food provision alongside childcare and activities. Consideration
should be given to tackling food insecurity and promoting healthy relationships
with food through incorporation of dignified, nutritious and economical food
preparation and provision where possible. The food on offer should be culturally
appropriate, helping to demonstrate inclusion and to reduce barriers to
participation. Working closely with local food suppliers should be encouraged to
support local economies and reduce food miles. This aspect of the programme,
which overlaps with nutritional education and food education, can be challenging
and we encourage local authorities to plan and prepare for this as best they can,
including engaging with experts and partners as appropriate.
More detail on approaches local authorities and delivery partners may find
useful can be found in the supporting materials section – Annex B
The guiding principles to underpin this approach are:
 Partnership Working, building on existing services, assets and knowledge
It is expected that existing and new local partnerships will play a key role in
ensuring the coordination and reach of provision, including both the regulated
and unregulated sectors, to ensure a joined up whole system approach to its
development and delivery. Working with the existing childcare sector (ELC and
Page 74

Page 75

school age childcare), outdoor education providers, activity providers (including
sports clubs) and the youth work and CLD sectors will ensure a broad range of
interests can be supported. Holiday activities and childcare may already be in
place at a local level delivered by a range of partners, and plans may already be
underway for summer 2022 provision. The aim of this investment is to
enhance any such existing work, building on and learning from existing
good practice. Where holiday provision does not exist in any form, funding
could be used to establish pilot scheme/s, or if more appropriate to channel
all funding to partners to deliver, beginning to test the guiding principles
and form the basis of future holiday provision. It is anticipated that this
funding will support improved coordination of existing provision, fill gaps and
create new opportunities, led by local knowledge and experience.
 Co-creation of services with children, young people and families
It is important that, as far as possible, any local offers are shaped around what
children and young people of all ages say/have said that they want and need.
The priorities of those in the target groups outlined above should help shape
delivery plans to ensure that support reaches those who would most benefit.
Provision should be child-centric, providing opportunities to connect with friends,
peers, wider community and the outdoors and to learn new skills. Activities
should be as wide ranging and inclusive as possible aiming to cover a wide range
of interests, backgrounds and circumstances and be shaped around a theme of
fun and play with a view to providing positive experiences. Activities may include:
sports; expressive arts; crafts; outdoor learning; outdoor play; trips and visits.
Early engagement with children and young people from eligible groups will
improve the design and delivery of services and encourage uptake.
 Moving towards a coordinated, integrated programme of childcare,
activities and food, that promotes inclusion and aims to remove barriers to
participation
The aim is that within local authority areas there is a variety of provision that
offers flexibility and choice to families and responds to their needs. Services will
vary across and within authorities, with an expected place-based focus on
coordinated services in areas with higher SIMD ratings. Where possible, financial
inclusion should be integrated, offering access to holistic support for the wider
family to help tackle hardship, for example, by signposting families to suitable
partners for advice, or by hosting information sessions via services. The
integration of services that offer longer sessions and allows parents to leave their
children should be considered, allowing parents and carers more flexibility to
work, train or study. Physical food provision, that compliments the free school
meal alternative offer, should be integrated where possible, recognising the
impact that food can have on children’s ability to participate in any activity.
Use of the funding
Funding should be flexible and responsive to the needs of eligible children and
families, as defined by this guidance. In order to meet local needs, partnerships
should be developed to plan and coordinate the most effective use of this funding to
Page 75

Page 76

achieve policy objectives. This includes making best use of existing services and
capacity across sectors (such as the out of school care sector, youth work or
children’s services) to provide a broad and flexible programme, utilising the expertise
of trusted partners to target provision most effectively. 
It is expected that the majority of spend will be on financing the cross-sectoral
delivery of a coordinated programme of activities, childcare and food for school age
children across each local authority area, with a particular focus on SIMD areas
where practicable. This can include running bespoke programmes for eligible
families or funding spaces for eligible children within existing local services alongside
paid-for provision to eliminate stigma. Funding can be spread across varied
providers who specialise in offering activities, childcare and food, including both
regulated and unregulated providers.
Consideration should also be given to:
 Who is best placed to deliver services that meet the needs of eligible families and
ensuring that potential partners are kept informed of ways they can bid in for
funding.
 Exploring alternative funding streams to supplement Scottish Government and
Local Authority sources in order to create more sustainable holiday provision, e.g.
through local sponsorship deals or entering partnerships with local businesses to
provide services in kind.
 Using funding for areas identified for improvement in the evaluation of the
Summer 2021 offer, e.g. addressing barriers to participation, for example
additional discretionary spend to mitigate against transportation costs; ensure
staffing is in place at appropriate ratios and with the necessary training and
experience to include children with Additional Support Needs.
 Capital costs, such as the purchase of play equipment, or improvement to
services that promote sustainability and quality experiences.
 Paying for staff and volunteer training.
 Food provision, ensuring food is varied, nutritious, and culturally appropriate.
Monitoring, Reporting and Evaluation
The £10 million funding is being paid to Local Authorities through the General
Revenue Grant. Whilst this funding is not ring-fenced it is vital that the impact and
learning of the programme be evidenced through proportionate reporting and
evaluation mechanisms.
There will be no interim reporting, the intention is that light touch reporting will be
supplemented by participant evaluation workshops that will generate key learning
required to inform future policy and practice and scale up holiday provision over the
course of this parliament. Further information will be provided separately.
Scottish Government commissioned engagement with participating children and
young people will also help to understand whether the programme met their needs
and feedback will shape future delivery.
Page 76

Page 77

Annex A
Summer 2022 Drivers Diagram
During the 2022
summer school
holidays eligible
children and their
families benefit
from access to
coordinated
holiday activities,
childcare and food
provision, that
meet their needs
and help them
thrive
Equity
Whole
Systems
Approach
Child and
Family
Centred
Prioritise those who would benefit most
Take a place-based approach, with focus on SIMD-indicators
Identify and remove barriers to access
Maintain awareness of potential sources of stigma and take steps to eliminate them
Make best use of existing resources: build on local services/capacity and leverage multiple funding
sources/streams
Co-create cross-sectoral planning and delivery, that lays the groundwork for future collaboration
Ensure robust information sharing processes to enable cohesive approach
Create coordinated access to childcare, activities and food
Embedding quality food standards, that promote positive food relationships, meeting nutritional and
cultural food requirements throughout provision 
Range of Options – providing flexibility and choice for children and families
Effective targeted marketing  - accessible to all, employing family referral and direct
communications
Opportunities for children to play, socialise and be active, particularly outdoors
Stigma-free approach to delivery, shaped by the needs of children, young people and their families and aligned with GIRFEC
Page 77

Page 78

Annex B
Supporting Materials
Food Offer, Food Standards and Safety
All food provided as part of the programme must:
 comply with regulations on food preparation:
 take into account allergies and dietary requirements (see the allergy guidance
for schools
 take into account any religious or cultural requirements for food
There is flexibility in the design of the food provision which should be tailored to
ensure that all food meets the dietary needs of the children and families who attend.
The food served should also be appropriate for the nature of the session, for
example, offering cold packed lunches for parks or outdoor venues or for day trips.
While there can be benefits to using a central food service to provide meals to
services, we expect local authorities to carefully consider whether using a central
food service is the right approach for providing high quality, attractive and tailored
food for those attending the programme. 
Providing food on site can provide an opportunity to engage children and families in
food preparation and nutrition. Providers have reported that when children are
involved in designing menus and the preparation of food, they are more engaged
and more willing to try new and healthier food.
We recommend that local authorities consider the provision of the food element of
the programme, in particular, that providers and children are offered the opportunity
to be involved in the planning and preparation of food. Such a developmental
approach is key to effecting long-term change in engagement with food and nutrition.
There are also environmental factors to consider when planning the food provision
and local authorities should consider whether clubs preparing food on their own
premises would produce less food and packaging waste and result in fewer food-
miles than off-site, centralised provision. 
Food Standards & Safety:
 See further information and guidance from Food Standards Scotland on safe
preparation and handling of food in the context of the pandemic.
 Nutrition
o Many of the standards in the Nutritional Requirements for Food and
Drink in Schools (Scotland) Regulations 2020 will apply to holiday
provision on school premises.  In general, all of the Regulations that
apply to food and drink provided on school premises will also apply to
third party providers. It is recommended to engage with local authority
catering leads who will be aware of what applies, to whom and when.
o Further detail can also be found in the Healthy Eating in Schools 2020
guidance which is statutory guidance designed to support
Page 78

Page 79

implementation of the Regulations.  Even where the Regulations do not
apply, it would be good practice to consider this guidance for holiday
provision particularly where meals such as breakfasts and lunches are
being provided.
o General nutrition advice can be found here.
 Allergies
o Model policy for allergy management in schools
o AllergyUK has useful factsheets on managing allergies
o Advice from Food Standards Scotland
Food information regulations - Natasha’s Law:
From 1 October 2021, changes to the Food Information Regulations 2014 came into
effect, adding new labelling requirements for food that is pre-packed for direct sale
(PPDS). 
Local authorities should take the time to read the guidance on the Food Standards
Agency website and ensure that all food provision for the summer programme meets
these requirements.
Public Health Advice and Resources
For the most up to date health advice please visit NHS Inform. Further guidance is
available from Public Health Scotland.
 Safe delivery of activities and services for children and young people
o Guidance for organised unregulated activities for children and young
people under 18: Coronavirus (COVID-19): organised activities for
children - gov.scot (www.gov.scot).
o Guidance for regulated childcare settings including school age
childcare, early learning childcare, and childminding services.
o Guidance on supporting children with additional support needs during
the pandemic.
o Guidance on trips and visits.
 Public Heath Scotland and Scottish Community Development Centre have
produced guidance on supporting communities safely. This includes
information on social and physical distancing, hand hygiene, and preparing,
handling and delivering food. The information is updated regularly.
Staff, Volunteer and Service User Safety
 Local authorities should ensure the organisations they work with have
appropriate processes for safeguarding, child protection and data protection in
relation to employees, volunteers and the people they are supporting.
 Where there are new pilots, work should start quickly to ensure staff and
volunteers undergo disclosure checks, child protection and children’s rights
training, some useful links below:
 The Scottish Social Services Council
Page 79

Page 80

 Disclosure Scotland
 The Care Inspectorate
 National guidance for child protection in Scotland
 Statutory guidance on children’s services planning
 Extra child protection resources can be found at NSPCC Learning
Working with Children with Additional Support Needs
Some of the key points for local authorities and partners to consider when designing
and implementing provision for children with ASN include:
 Identifying the most vulnerable children, young people and families;
 Making decisions and, where appropriate, delegate responsibility for decision
making to different levels of the system to enable responsive support;
 Speaking to families regularly to understand how their needs may have
changed and may have continued to change;
 Being flexible in supporting families;
 Ensure staff are trained, supported and provided with appropriate equipment
in order to provide flexible and responsive care in line with government
guidance
 Maintaining a positive level of trust in staff from a parent perspective and
ensuring staff receive the right level of training from a provider perspective
Risk assessments are an important part of this provision and should be used as an
enabler to providing support rather than a barrier. A good risk assessment which
supports effective risk management and creative thinking will lead to different
approaches to face-to-face support rather than support being withdrawn particularly
for children, young people and families who are particularly vulnerable or at high risk.
There are many local and national organisations including special schools with
expertise in working with children with ASN and we recommend that local authorities
engage with them.
 Education Scotland has produced a helpful document signposting to different
areas of support for ASN specific needs in relation to the pandemic
Signposting and Referrals
Providers should be able to provide information, signposting or referrals to other
services and support that would benefit the children who attend their provision and
their families. This could include sessions provided by: 
 Citizen’s Advice Scotland
 school nurses, dentists or other healthcare practitioners
 family support services or children’s services
 housing support officers
 Jobcentre Plus
 organisations providing financial education
 early years and childcare, including help to pay for childcare (e.g. Tax Free
Childcare)
Page 80

Page 81

 Parent Club
 ParentZone Scotland
 Young Scot
 Ask CPAG
Environment and sustainable delivery
Local authorities and other partners are encouraged to consider how sustainable
development can be reflected in their ethos, day-to-day operations and throughout
the delivery of their programmes.
Some practices that local authorities may wish to consider are:
 Minimising the use of single-use plastics
 Where possible using locally sourced food and ingredients
 Making use of food surplus organisations
 Ensuring there is a wide range of recycling and compost facilities for waste
 Growing fruit and vegetables and showing how they can be used and cooked.
 Encouraging uniform banks/exchange schemes
 Encouraging active travel and use of public transport, promoting the young
person’s free bus travel scheme.
 Encouraging children to engage with environmental issues and take a leading
role in sustainable practices.
This list is not exhaustive and local authorities are invited to reflect on their settings
and consider ways that their programmes can be more environmentally friendly and
sustainable.
Useful reports and project examples:
 The Scottish Poverty and Inequality Research Unit (SPIRU) has produced a
tool to support local mapping of out of school holiday provision. This may be
useful for local authorities and other partners looking to better understand
current provision in their areas:
https://www.gcu.ac.uk/gsbs/research/spiru/publications
 Young Scot’s #YSAttain project provides access to leisure activities, food and
travel for young people through the National Entitlement Card. More
information and local authority case studies available here:
https://youngscot.net/attainment
 YouthLink - link to latest youth work delivery guidance is here:
Face-to-face Youth Work | Frequently Asked Questions
(youthlinkscotland.org)
An independent evaluation of six youth work-led projects in different local authority
areas in summer 2020, includes examples of activities successfully delivered
remotely and digitally in the context of pandemic restrictions:  food-insecurity-
report_proofed.pdf (youthlinkscotland.org)
 International Public Policy Observatory reports on how to best support
children’s emotional recovery from the pandemic and how to promote
wellbeing:
Page 81

Page 82

o ‘The Great Summer Reset’: An IPPO policy note on how best to
support children's emotional recovery | IPPO (covidandsociety.com)
o Wellbeing recovery: what should summer support programmes look
like for schoolchildren this year? - IPPO (covidandsociety.com)
 The Scottish Government School Age Childcare Progress Report which
details school age childcare policy development as well including detailed
case studies of services operating across Scotland specifically targeted
towards families on low incomes.
 Shared Care Scotland report - Holidays or Isolation: Research into holiday
activity provision for disabled children and young people in Scotland
 See our case study pack for further examples from Summer 2021s – this will
be provided shortly.
Page 82

Page 83

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Education
Committee: Educational Services Committee 28 September 2022
Subject: Education Delivery Plan 2021/22 Year-end Progress
1 Purpose
1.1 This report provides members with the year-end progress of the 2021/22
Delivery Plan agreed at Committee on 9 June 2021.
2 Recommendations
2.1 It is recommended that Committee notes the progress made on the delivery of
the 2021/22 plan. 
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks. 
3.2 Progress on the Education Delivery Plan is reported to Educational Services
Committee twice yearly, at mid-year and year-end and relates to the academic
year.
4 Main Issues
4.1 The 2021/22 Delivery Plan was presented to Educational Services Committee
on 9 June 2021 and mid-year progress reported on 16 March 2022.
4.2 Year-end progress is set out in detail at Appendix 1.
4.3 Of the 7 actions set out in the plan, 6 remain in progress as their end dates fall
out with the reporting period, with 1 action overdue. ‘Promote digital service
delivery’ has been impacted by a further delay to the launch of both SEEMiS
products ‘Early Years’ and ‘Schools’, which will now not be delivered until
August 2023 at the earliest. 
ITEM 14
Page 83

Page 84

4.5 As outlined to committee previously, work has been undertaken this session
to review our existing Performance Indicators to ensure that we have a range
of measures that reflect the scope of our work, and accurately identify impact.
A refined list of PIs will be included in the 2022/23 Delivery Plan to be brought
to the December 2022 committee. 
5 People Implications 
5.1 There are no direct people implications arising from this report. 
6 Financial & Procurement Implications 
6.1  There are no direct financial or procurement implications arising from this
report. 
7 Risk Analysis 
7.1  Failure to deliver on the actions assigned to Education may have a direct
impact on the delivery of the Council’s Strategic Plan. It is essential that
remedial action is taken to ensure strategic delivery plans achieve the
commitments detailed and approved. 
8 Equalities Impact Assessment 
8.1  Screening and impact assessments will be carried out on specific activities as
required. 
9 Consultation 
9.1  The delivery plans were developed through consultation with officers from the
strategic service areas. 
10 Strategic Assessment 
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities of the Council. 
Chief Officer: Laura Mason
Service Area:  Education
Date:   4 August 2022
_____________________________________________________________
Page 84

Page 85

Person to Contact:  Andrew Brown    
andrew.brown@west-dunbarton.gov.uk 
Appendices:  Appendices 1: Education Delivery Plan 2021/22 - Year-
end Progress   
Background Papers: 2021/22 Education Delivery Plan Report – Educational
Services Committee, 9 June 2021  
2021/22 Education Delivery Plan Mid-year Report –
Educational Services Committee, 16 March 2022 
Wards Affected: All 
Page 85

Page 86

Page 86

Page 87

Appendix 1: Education Delivery Plan 2021/22 – Year-end Progress
1. A strong local economy and improved job opportunities
Increased skills for life and learning
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Secondary school attendance rate
(S1-S5). Sixth year pupils are not
included as they are beyond the age
of compulsory schooling.
91.8% 84.9% 91% Claire Cusick
Primary school attendance rate 94.7% 91.9% 95% Claire Cusick
Cases of exclusion per 1,000 school
pupils 26 40
WDC data on exclusions during the 2021-22
school session are showing exclusion
incidents per 1,000 pupils for that session
increased by 8 from the previous school
session to 26. The figure is 14 below the
target of 40. Data is published by the
Scottish Government biannually and 2021-22
data will not be published. Therefore, no
comparison can be made with other
authorities or with National data.
Claire Cusick
Primary Exclusion (days lost per
1,000 pupils) NEW 8.7 7.0
Data for this indicator comes from a bi-
annual Scottish Government data collection.
No data will be recorded for school session
2021-22.
Derek McGlynn
Secondary Exclusion (days lost per
1,000 pupils) NEW 38.0 64.6
Data for this indicator comes from a bi-
annual Scottish Government data collection.
No data will be recorded for school session
2021-22.
Derek McGlynn
Percentage of educational
establishments receiving positive 0% 100% Inspection programme stopped during
pandemic. Programme has recommenced in Julie McGrogan
Page 87

Page 88

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
inspection reports September 2022.
Cost per primary school pupil £ £6,867.0
0
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Laura Mason
Cost per secondary school pupil £ £7,695.0
0
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Laura Mason
Cost per pre-school place £ £9,528.0
0
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Laura Mason
% of pupils gaining  5 + awards at
level 5 61%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Andrew Brown
% of pupils gaining 5+ awards at
level 6 33%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Andrew Brown
% pupils in 20% most deprived areas
getting 5+ awards at level 5 45%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Andrew Brown
% pupils in 20% most deprived areas
getting 5+ awards at level 6 21%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Andrew Brown
% of Adults Satisfied with local
schools N/A
Local authority level data has not been
published for this indicator by Scottish
Government/Improvement Service for 2021.
2021/22 data for LGBF indicators is not due
to be published until 2023.
Andrew Brown
Percentage of school leavers in
positive and sustained destinations 90.99% 92.6%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Susie Byrne
Overall Average Total Tariff 895
SQA data is released in August followed by
the Scottish Government's benchmarking
tool, Insight, in mid-September at which
point the 2021/22 data will be available.
WDC's comparative performance against
other local authorities will be available in
February 2023 following publication of the
Derek McGlynn
Page 88

Page 89

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Local Government Benchmarking Framework
by the Improvement Service.
Average Total Tariff SIMD Quintile 1 676 722
SQA data is released in August followed by
the Scottish Government's benchmarking
tool, Insight, in mid-September at which
point the 2021/22 data will be available.
WDC's comparative performance against
other local authorities will be available in
February 2023 following publication of the
Local Government Benchmarking Framework
by the Improvement Service.
Derek McGlynn
Average Total Tariff SIMD Quintile 2 912 950
SQA data is released in August followed by
the Scottish Government's benchmarking
tool, Insight, in mid-September at which
point the 2021/22 data will be available.
WDC's comparative performance against
other local authorities will be available in
February 2023 following publication of the
Local Government Benchmarking Framework
by the Improvement Service.
Derek McGlynn
Average Total Tariff SIMD Quintile 3 1,100 1,000
SQA data is released in August followed by
the Scottish Government's benchmarking
tool, Insight, in mid-September at which
point the 2021/22 data will be available.
WDC's comparative performance against
other local authorities will be available in
February 2023 following publication of the
Local Government Benchmarking Framework
by the Improvement Service.
Derek McGlynn
Average Total Tariff SIMD Quintile 4 1,121 1,250
SQA data is released in August followed by
the Scottish Government's benchmarking
tool, Insight, in mid-September at which
point the 2021/22 data will be available.
WDC's comparative performance against
other local authorities will be available in
February 2023 following publication of the
Local Government Benchmarking Framework
by the Improvement Service.
Derek McGlynn
Average Total Tariff SIMD Quintile 5 1,315 1,170 SQA data is released in August followed by
the Scottish Government's benchmarking Derek McGlynn
Page 89

Page 90

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
tool, Insight, in mid-September at which
point the 2021/22 data will be available.
WDC's comparative performance against
other local authorities will be available in
February 2023 following publication of the
Local Government Benchmarking Framework
by the Improvement Service.
% of P1, P4 and P7 pupils combined
achieving expected CFE Level in
Literacy
62%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Julie McGrogan
% of P1, P4 and P7 pupils combined
achieving expected CFE Level in
Numeracy
72%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Julie McGrogan
Literacy Attainment Gap (P1,4,7
Combined) - percentage point gap
between the least deprived and most
deprived pupils
18%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Julie McGrogan
Numeracy Attainment Gap (P1,4,7
Combined) - percentage point gap
between the least deprived and most
deprived pupils
17%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Julie McGrogan
Percentage of pupils achieving
expected levels in Writing by P7 N/A
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Julie McGrogan
School Attendance Rates (per 100
pupils) 90.4% 0%
Data for this indicator comes from a bi-
annual Scottish Government data collection.
No data will be recorded for school session
2021-22.
Claire Cusick
School Attendance Rates for Looked
After Children (per 100 Looked After
Children)
N/A 0%
Data for this indicator comes from a bi-
annual Scottish Government data collection.
No data will be recorded for school session
2021-22.
Claire Cusick
School Exclusion Rates (per 1000
pupils) 17.89 0
Data for this indicator comes from a bi-
annual Scottish Government data collection.
No data will be recorded for school session
2021-22.
Claire Cusick
School Exclusion Rates for Looked
After Children (per 1000 looked after N/A 0 Data for this indicator comes from a bi-
annual Scottish Government data collection. Claire Cusick
Page 90

Page 91

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
children) No data will be recorded for school session
2021-22.
Participation Rate for 16-19 year olds
(per 100) 90.8%
2021/22 data for LGBF indicators will not be
available until 2023 following publication by
the Improvement Service.
Susie Byrne
Action Status Progress Due Date Note Owner
Increase attainment and positive destinations 30-Jun-2023 Progress made on BGE attainment. Insight will be updated mid-September
with SQA data, and again in February with leaver destinations.
Andrew Brown;
Julie McGrogan
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Increase Attainment
and Positive
Destinations
This risk concerns the delivery of the key
areas within the Scottish Governments
agenda for improvement
The risk concerns the delivery of
approaches to the development of skills for
learning, life and work. The delivery of
revised learner pathways in the Senior
Phase, and the increase in the number of
young people entering positive
destinations.
06-Jan-2022
A working group are reviewing parental
involvement and engagement alongside
west partnership partners. They are taking
cognisance of the impact of covid and
challenges this presents to amend the model
promoted.
Andrew Brown;
Julie McGrogan
Failure to implement
broad-ranging school
improvement to raise
attainment and
achievement
This risk concerns the delivery of
excellence and equity for our young people
to support them to attain and achieve at
the highest level. In particular, it is aimed
at bridging the attainment gap and
breaking the cycle of disadvantage. This
also includes the focus on intervention at
early years to improve life chances at all
points on the learning journey. A key
driver is the Council's participation in the
Scottish Attainment Challenge which will
be delivered over 4-years from 2015. Year
3 commenced in April 2017 and will bring
together the workstreams to deliver a self
improving school system programme.
07-Dec-2021
Building on achievements made since 2015
the service is developing plans to both
accelerate and embed progress in academic
sessions 2021/22 and 2022/23, these plans
are being reviewed to reflect the refreshed
SAC programme. The key risk to ongoing
progress is SG's plan for a tapered SAC
funding model between 2022 to 2026.
Julie McGrogan
Page 91

Page 92

2. Supported individuals, families and carers living independently and with dignity
Enhanced life chances
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
% of funded Early Years Provision
which is graded good or better 87.5% 95% 93% of ELC are evaluated at good and
above. Kathy Morrison
Action Status Progress Due Date Note Owner
Deliver the best start in learning 31-Dec-2022 On track with delivery of projects. Kathy Morrison
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Deliver the Best Start
in Learning
This risk concerns the revision of the
timescale for the statutory delivery of the
ELC entitlement to 1140 hours from
August 2021 to August 2021. The quality
of the entitlement must meet the National
Standard Criteria.
28-Jul-2022
Children returned to full time ELC and
almost all have not been adversely
impacted.
Kathy Morrison
Failure to deliver the
Early Years Agenda
Timescales for delivery of 1140 hours has
been revised by the SG due to the impact
of COVID 19 on progress with delivery.
The statutory delivery date for eligible 2
year olds and all 3 and 4 year olds has
been revised to August 2021. There is no
risk to West Dunbartonshire Council as the
statutory entitlement was delivered by
May 2021 for all eligible 2 year olds and
entitlement for all 3 and 4 year olds.
29-Jun-2022 The projects remaining are within the ELC
plan with budget allocated. Kathy Morrison
Improved wellbeing
Page 92

Page 93

Action Status Progress Due Date Note Owner
Improve the health and wellbeing of all
children, young people and staff ensuring
their rights and needs are met
30-Jun-2022 On track with programme of delivery of professional learning and school
visits.
Claire Cusick;
Christina
Dunsmore
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Improve the Health
and Wellbeing of all
Children, Young
People and Staff
Ensuring their Rights
and Needs are Met
This risk concerns the implementation of
the Health and Wellbeing Strategy as well
as activities to support wellbeing in
families.
25-Feb-2022
We have a range of professional learning
being developed and undertaken, supports
for staff and pupils in place across our
settings which will address these needs and
ensured a well trained workforce.
Claire Cusick
3. Meaningful engagement with active, empowered and informed citizens who feel safe and engaged
Strong and active communities
Action Status Progress Due Date Note Owner
Review and improve support for reducing
inequity 30-Jun-2023 On track. Scrutiny of PEF planning and project delivery. Claire Cusick
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Review and Improve
Support for Reducing
Inequality
This risk relates to the priority of the
National Improvement Framework to
ensure that opportunities are available to
all, irrespective of their Scottish Index of
Multiple Deprivation (SIMD) classification.
25-Feb-2022
Robust school improvement processes and
monitoring in place to support and challenge
identification and interventions to narrow
the gap.
Equity working group leads school
awareness of impacts of poverty and to
support establishments in planning locally to
address.
Educational services play an integral role in
Child Poverty Report and Planning.
Claire Cusick
Page 93

Page 94

5. Efficient and effective frontline services that improve the everyday lives of residents
A committed and skilled workforce
Action Status Progress Due Date Note Owner
Develop empowered leadership to provide the
highest quality of learning and teaching 28-Mar-2029 On track. Delivery of programme of professional learning, and
improvement framework visits.
Claire Cusick;
Julie McGrogan
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Develop Empowered
Leadership to Provide
the Highest Quality of
Learning and
Teaching
25-Feb-2022
Identified leadership pathways being
planned.  All establishments supported and
challenged in ensuring leadership at all
levels to support improvement and change.
Collaborative planning with West Partnership
has and will continue to support
developments in this area via BME
opportunities, HT induction planning, Into
headship and thinking about headship
courses adn middle leadership opportunities.
Claire Cusick;
Julie McGrogan
A continuously improving Council delivering best value
Action Status Progress Due Date Note Owner
Promote digital service delivery 30-Jun-2022
Implementation has been impacted by delay to SEEMiS ‘Schools’ and ‘Early
Years’ products, to replace the existing applications. Development has now
been brought in-house by SEEMiS, after failure by contractor to meet
milestones. Progress has been made with re-procurement of ParentPay and
procurement of Teacher Booker to provide an online solution for supply
teacher booking.
Andrew Brown
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Page 94

Page 95

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Promote Digital
Service Delivery
This risk relates to the need to deliver
more efficient services and in keeping pace
with the digital expectations of service
users.
06-Jan-2022
Implementation has been impacted by delay
to SEEMiS ‘Schools’ and ‘Early Years’
products. Whilst existing solution continue
to work, they are long overdue for
replacement, and continue the need for
legacy applications to support their use.
Andrew Brown
Sustainable & attractive local communities
Action Status Progress Due Date Note Owner
Provide a sustainable service 30-Jun-2024 On track with implementation of sustainability strategy. Julie McGrogan
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Provide a Sustainable
Service
This risk concerns the entitlement for
building values, attitudes, knowledge and
skills to develop practices and take
decisions compatible with a sustainable
and equitable society.
06-Jan-2022
On track with programme of delivery. Range
of projects being implemented by
establishments following COP 26.
Julie McGrogan
Action Status
Cancelled
Overdue; Neglected
Unassigned; Check Progress
Not Started; In Progress; Assigned
Completed
PI Status Long Term Trends Short Term Trends
Page 95

Page 96

Alert
Warning
OK
Unknown
Data Only
Improving
No Change
Getting Worse
Improving
No Change
Getting Worse
Risk Status
Alert
High Risk
Warning
OK
Unknown
Page 96

Page 97

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Education
Committee: Educational Services Committee 28 September 2022
Subject: Quality Framework Launch
1 Purpose
1.1 This report advises members on the launch of the ‘Quality Framework’, and
outlines the programme of activities relating to quality assurance.
2 Recommendations
2.1 It is recommended that Committee notes the launch of the ‘Quality
Framework’.
3 Background
3.1 It is the responsibility of the local authority to ensure the quality of education
provision in our establishments. We do this by working directly with our
establishments through a programme of activities outlined in our
‘Improvement Framework’. Whilst this addresses the quality of provision in
each establishment, of great benefit to us as a service would be a holistic
overview of quality, for which we have established a ‘Quality Framework’.
3.2 Previous approaches to assessing the overall quality of provision have been
the result of external factors – in 2012, we worked in partnership with
Education Scotland as part of a ‘Validated Self Evaluation’ programme of
activities. In December 2017, we worked with HM Inspectors within Education
Scotland to build on ongoing activities to evaluate the impact of strategies on
the progress to improve learning, raise attainment and narrow the poverty
related attainment gap.   
3.3 Our ‘Quality Framework’ will allow us to take a broader look at the quality of
education provision, and highlight areas for improvement over time.
4 Main Issues
Quality Assurance
4.1 The Quality Framework can be found online at
https://sites.google.com/ourcloud.buzz/quality-framework/home.
4.2 In developing our ‘Quality Framework’, we turned to the national ‘Quality
Management in Education 2’ (QMIE2) framework, to structure our approach.
ITEM 15
Page 97

Page 98

QMIE2 has 25 quality indicators across the following six themes which can be
used to assess the quality of education provision:
1. What key outcomes have we achieved?
2. How well do we meet the needs of our stakeholders?
3. How good is our delivery of education processes?
4. How good is our management?
5. How good is our leadership?
6. What is our capacity for improvement?
4.3 The 25 quality indicators allow education authorities to direct their evaluative
activities into core areas of education provision. Although all 25 indicators
carry great value, a manageable approach to addressing each has been
created, and a structure to govern the evaluative activities. 
Review Cycle
4.4 By creating six different evaluative groups based on the six themes above, we
can address all 25 quality indicators over a three year programme of activities.
The cycle of evaluative activities can be found online at
https://sites.google.com/ourcloud.buzz/quality-framework/evaluation-cycle.
4.5 Groups will be composed of a variety of stakeholders, ensuring we have
representative people involved in the activities. Where suitable, this will
involve external partners making sure that we ‘look outwards’ in our
evaluations.
4.6 A governance framework has been established to manage the activities of the
group, and coordinate publication of findings on the website. We plan to use
this as a ‘live’ view of quality activities, with anyone being able to visit the
website and get an up-to-date view of the current state of the quality of
education provision.
Lenses
4.7 To help give a clear focus to the work of the quality groups, activities will be
structured according to three lenses – this gives the groups involved in the
quality assurance activities a clear direction. The lenses match in with the
areas identified through the Community Planning Partnership –
Empowerment, Sustainability and Wellbeing.
4.8 Groups would change their lens each year, helping us to get a clear overall
view of the quality of education provision.
4.9 In 2022, the groups will address the following questions:
Lens 1: Empowerment – 
• To what extent are learners included, engaged and empowered?
Page 98

Page 99

• To what extent are parents/carers and families involved and engaged
in improvement?
• How empowered are stakeholders in policy review and development?
• How active are our learners and other stakeholders in the work of the
service?
• How central are stakeholders to the development of operational plans?
• To what extent does Education in West Dunbartonshire empower
stakeholders?
Lens 2: Sustainability –
• How sustainable is the delivery of our education services?
• How well do our vision, values and aims promote positive attitudes to
social and cultural diversity?
• To what extent does our leadership of change and improvement
promote creativity, innovation and step change?
Lens 3: Wellbeing –
• To what extent do the aims, objectives and targets of the service have
the wellbeing of stakeholders at heart?
• Does the fulfilment of statutory duties promote the wellbeing of all
stakeholders?
4.10 Output of the quality activities will be published on the website as they are
completed, giving a ‘live’ view of the quality of education provision to any site
visitor at any time. We will return to Education Committee at various stages
with an update on the findings and publications.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 It is our statutory duty to ensure the quality of education provision of our
establishments. Failure to do so would bring reputational damage, and impact
on the delivery of strategic objectives.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
Page 99

Page 100

required.
9 Consultation
9.1 The Section 95 Officer and officers from the strategic service area were
consulted to develop the framework.
10 Strategic Assessment
10.1 Failure to ensure the quality of education provision in our establishment would
impact our delivery of ‘Objective 7. Increased skills for life and learning
through education and training’ and ‘Objective 8. Children are given the best
start in life’. 
Chief Officer: Laura Mason
Service Area: Education
Date:  29 August 2022
_____________________________________________________________
Person to Contact:  Andrew Brown
andrew.brown@west-dunbarton.gov.uk
Appendices:  None
Background Papers: None
Wards Affected: All
Page 100

Page 101

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Educational Services Committee:   28 September 2022
___________________________________________________________________
Subject: Educational Services Budgetary Control Report to
31 July 2022 (Period 4).
1. Purpose
1.1 The purpose of the report is to provide Committee with an update on the
financial performance of Educational Services to 31 July 2022 (Period 4).
2. Recommendations
2.1  Committee is asked to:
(a) note that the revenue account currently shows a projected annual adverse
revenue variance of £0.045m (0.04% of the total budget); and
(b) note that the capital account shows a projected in-year adverse variance
of £0.025m made up of £0.025m overspend (0.5% of the current year
budget), and there is no slippage to 2023/24. Acceleration of £0.241m has
been requested for Renton Campus as a part retention is due to be paid.
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2021/2022, including a total net Educational
Services Committee budget of £107.788m. Since then the following budget
adjustments have taken place revising the budget to £108.286m.
Budget Agreed by Council 9 March 2022     £107.788m
Easter Study Support Provision £0.101m
Utilities Provision (reallocation from sundry
services)
£0.397m
Revised Budget   £108.286m
Capital
3.2 At the meeting of Council on 22 March 2021 Members also agreed the
updated 10 year General Services Capital Plan for 2021/22 to 2030/31.  The
three years from 2021/22 to 2023/24 have been approved in detail with the
remaining seven years from 2024/25 to 2030/31 being indicative at this stage.
ITEM 16
Page 101

Page 102

After adjusting for anticipated slippage from 2021/22 into 2022/23, and
acceleration of £0.241m, the budget agreed for 2022/23 was £5.205m 
4. Main Issues
Revenue Budget
4.1 The current departmental budgetary position is summarised in Appendix 1,
with detailed analysis by service in Appendix 2.
4.2 The overall projected full year variance is £0.045m adverse. Information and
all individual variances of over £50,000 are detailed in Appendix 3.
Capital
4.3 The overall Educational Services programme summary report at Appendix 5
shows that the expected over/underspend on the project life is anticipated to
be £0.025m over the original budget, and there is currently no slippage of
current year budget to 2022/23.  Appendix 6 highlights one project at red
status which has a small overspend.  Appendix 7 highlights all projects at
green status, of which none have an in-year adverse variance of over
£0.050m.
5. People Implications
5.1 There are no direct people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above and within the appendices, there
are no financial or procurement implications of the budgetary control report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
costs and/or reduced income streams being identified between now and the
end of the financial year. This is particularly sensitive to the ongoing impact of
Covid-19.  Finance staff are in regular discussion with budget holders to
ensure potential issues are identified as early as possible in order to mitigate
this risk.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore, no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of Education, Finance and Legal services were requested in the
preparation of this report and they have advised there are neither any
Page 102

Page 103

additional issues nor concerns with the proposal. As the report is for noting no
further consultation is envisaged.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the 5 strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. 
Laurence Slavin
Chief Officer - Resources
Date: 23 August 2022
Person to Contact: Joe Reilly - Business Unit Finance Partner (Education),
Church St, Dumbarton, G82 1QL, telephone: 01389
737707, e-mail joe.reilly@west-dunbarton.gov.uk 
Appendices: Appendix 1 - Revenue Budgetary Control 2022/23
- Summary Report
Appendix 2 - Revenue Budgetary Control 2022/23
- Service Reports
-
Appendix 3 - Analysis of Revenue Variances over  
£50,000
Appendix 4 – Analysis of Revenue Efficiencies
Appendix 5 - Capital Programme Summary
Appendix 6 – Capital Projects at Red Status
Appendix 7 – Capital Projects at Green Status
Appendix 8 – Capital Acceleration
Background Papers: Ledger output – period 4
General Services Revenue Estimates 2022/23
Wards Affected: ,All
Page 103

Page 104

Page 104

Page 105

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2022/23REVENUE BUDGETARY CONTROL 2022/23
EDUCATION SUMMARY
Total Budget
2022/23
YTD Spend
2022/23
Forecast Spend
2022/23
Annual
RAG
Status
£000 £000 £000 £000 %
31,800 9,969 31,604 (195) -1% 
30,984 10,596 31,097 113 0% 
16,611 4,611 16,651 40 0% 
571 203 571 0 0% 
627 209 627 0 0% 
8,415 4,324 8,409 (6) 0% 
15,395 5,612 15,452 57 0% 
Creative Arts 620 222 621 0 0% 
202 23 202 0 0% 
852 487 855 3 0% 
349 87 349 0 0% 
Performance & Improvement 453 120 453 0 0% 
Education Development 1,407 247 1,440 33 2% 
Raising Attainment - Primary 0 0 0 0 0% 
Raising Attainment - Secondary 0 0 0 0 0% 
Pupil Equity Fund LAC 0 0 0 0 0% 
108,286 36,710 108,331 45 0.04% 
Central Admin
Workforce CPD
Total Net Expenditure
Psychological Services
Sport Development / Active Schools
Early Education
PPP
Curriculum for Excellence
31 July 2022
Specialist Educational Provision
Service / Subjective Summary Annual Variance
2022/23
Primary Schools
Secondary Schools
Page 105

Page 106

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION DETAIL
MONTH END DATE 31 July 2022
PERIOD P4
Actual Outturn
2021/22
Total Budget
2022/23
Year to date
2022/23
% Spend to
Date of Total
Budget
Forecast
Spend 2022/23
RAG
Status
£000 £000 £000 % £000 £000 %
86,892 Employee 87,965 28,667 33% 88,348 383 0% 
8,068 Property 8,027 1,122 14% 8,076 49 1% 
2,187 Transport and Plant 2,482 960 39% 2,469 (12) 0% 
4,262 Supplies, Services and Admin 2,805 617 22% 2,833 29 1% 
23,757 Payments to Other Bodies 21,900 7,644 35% 21,853 (47) 0% 
3,623 Other 2,219 1,848 83% 3,095 875 39% 
128,789 Gross Expenditure 125,398 40,857 33% 126,675 1,276 1% 
(20,014) Income (17,113) (4,148) 24% (18,344) (1,232) 7% 
108,775 Net Expenditure 108,286 36,709 34% 108,330 45 0% 
£000 £000 £000 % £000 £000 %
27,239 Employee 27,604 9,043 33% 27,579 (25) 0% 
2,778 Property 3,008 340 11% 2,987 (22) -1% 
290 Transport and Plant 333 287 86% 333 0 0% 
599 Supplies, Services and Admin 411 59 14% 399 (12) -3% 
25 Payments to Other Bodies 15 2 15% 15 0 0% 
388 Other 766 291 38% 776 10 1% 
31,319 Gross Expenditure 32,137 10,022 31% 32,089 (48) 0% 
(753) Income (337) (53) 16% (484) (147) 44% 
30,566 Net Expenditure 31,800 9,969 31% 31,605 (195) -1% 
£000 £000 £000 % £000 £000 %
27,602 Employee 28,540 9,329 33% 28,565 25 0% 
1,056 Property 1,161 113 10% 1,180 19 2% 
576 Transport and Plant 615 481 78% 615 0 0% 
460 Supplies, Services and Admin 433 16 4% 433 0 0% 
458 Payments to Other Bodies 472 441 93% 472 0 0% 
628 Other 929 280 30% 929 0 0% 
30,780 Gross Expenditure 32,149 10,661 33% 32,193 44 0% 
(1,152) Income (1,165) (64) 5% (1,096) 69 -6% 
29,628 Net Expenditure 30,984 10,598 34% 31,097 113 0% 
£000 £000 £000 % £000 £000 %
11,226 Employee 11,424 3,645 32% 11,490 67 1% 
129 Property 138 33 24% 138 0 0% 
1,229 Transport and Plant 1,391 169 12% 1,383 (8) -1% 
137 Supplies, Services and Admin 119 18 15% 119 (0) 0% 
5,776 Payments to Other Bodies 3,805 736 19% 3,744 (61) -2% 
19 Other 38 16 41% 38 0 0% 
18,516 Gross Expenditure 16,915 4,617 27% 16,913 (3) 0% 
(351) Income (305) (6) 2% (262) 43 -14% 
18,165 Net Expenditure 16,611 4,610 28% 16,651 40 0% 
£000 £000 £000 % £000 £000 %
550 Employee 636 201 32% 636 0 0% 
0 Property 0 0 0% 0 0 0% 
0 Transport and Plant 1 1 59% 1 0 0% 
(10) Supplies, Services and Admin 6 1 9% 6 0 1% 
0 Payments to Other Bodies 0 0 0% 0 0 0% 
0 Other 0 0 0% 0 0 0% 
540 Gross Expenditure 643 202 31% 644 0 0% 
(73) Income (73) 0 0% (73) 0 0% 
467 Net Expenditure 571 202 35% 571 0 0% 
Forecast Variance 2022/23
Primary Schools
All Services
Secondary Schools
Special Schools
Service Summary
Psychological Services
Page 106

Page 107

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION DETAIL
MONTH END DATE 31 July 2022
PERIOD P4
Actual Outturn
2021/22
Total Budget
2022/23
Year to date
2022/23
% Spend to
Date of Total
Budget
Forecast
Spend 2022/23
RAG
Status Forecast Variance 2022/23Service Summary
£000 £000 £000 % £000 £000 %
0 Employee 0 0 0% 0 0 0% 
0 Property 0 0 0% 0 0 0% 
0 Transport and Plant 0 0 0% 0 0 0% 
0 Supplies, Services and Admin 0 0 0% 0 0 0% 
908 Payments to Other Bodies 893 298 33% 893 0 0% 
0 Other 0 0 0% 0 0 0% 
908 Gross Expenditure 893 298 33% 893 0 0% 
(278) Income (266) (89) 33% (266) 0 0% 
630 Net Expenditure 627 209 33% 627 0 0% 
£000 £000 £000 % £000 £000 %
13,788 Employee 14,927 4,447 30% 14,938 11 0% 
289 Property 250 57 23% 245 (5) -2% 
1 Transport and Plant 10 2 16% 6 (4) -44% 
1,273 Supplies, Services and Admin 1,049 74 7% 1,049 (0) 0% 
3,308 Payments to Other Bodies 3,054 957 31% 3,054 0 0% 
0 Other 0 0 0% 0 0 0% 
18,659 Gross Expenditure 19,290 5,537 29% 19,292 1 0% 
(9,693) Income (10,875) (1,213) 11% (10,883) (8) 0% 
8,966 Net Expenditure 8,415 4,324 51% 8,409 (6) 0% 
£000 £000 £000 % £000 £000 %
0 Employee 0 0 0% 0 0 0% 
3,315 Property 3,462 577 17% 3,518 57 2% 
0 Transport and Plant 0 0 0% 0 0 0% 
0 Supplies, Services and Admin 0 0 0% 0 0 0% 
12,154 Payments to Other Bodies 12,692 5,035 40% 12,692 0 0% 
0 Other 0 0 0% 0 0 0% 
15,469 Gross Expenditure 16,154 5,612 35% 16,210 57 0% 
(732) Income (758) 0 0% (758) 0 0% 
14,737 Net Expenditure 15,395 5,612 36% 15,452 57 0% 
£000 £000 £000 % £000 £000 %
0 Employee 0 0 0% 0 0 0% 
0 Property 0 0 0% 0 0 0% 
0 Transport and Plant 0 0 0% 0 0 0% 
192 Supplies, Services and Admin 182 23 12% 182 0 0% 
10 Payments to Other Bodies 20 0 0% 20 0 0% 
0 Other 0 0 0% 0 0 0% 
202 Gross Expenditure 202 23 11% 202 0 0% 
0 Income 0 0 0% 0 0 0% 
202 Net Expenditure 202 23 11% 202 0 0% 
£000 £000 £000 % £000 £000 %
611 Employee 115 165 144% 240 125 109% 
493 Property 8 0 5% 8 0 0% 
2 Transport and Plant 0 0 64% 1 0 21% 
240 Supplies, Services and Admin 53 22 41% 52 (0) -1% 
356 Payments to Other Bodies 248 153 62% 349 101 41% 
2,588 Other 486 1,261 259% 1,351 865 178% 
4,290 Gross Expenditure 910 1,601 176% 2,001 1,091 120% 
(1,463) Income (58) (1,114) 1907% (1,146) (1,088) 1861% 
2,827 Net Expenditure 852 487 57% 855 3 0% 
PPP
Curriculum for Excellence
Central Admin
Miscellaneous
Early Years
Page 107

Page 108

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION DETAIL
MONTH END DATE 31 July 2022
PERIOD P4
Actual Outturn
2021/22
Total Budget
2022/23
Year to date
2022/23
% Spend to
Date of Total
Budget
Forecast
Spend 2022/23
RAG
Status Forecast Variance 2022/23Service Summary
£000 £000 £000 % £000 £000 %
268 Employee 313 87 28% 313 (0) 0% 
0 Property 0 0 0% 0 0 0% 
0 Transport and Plant 1 0 0% 1 0 0% 
21 Supplies, Services and Admin 22 0 1% 22 0 0% 
14 Payments to Other Bodies 13 0 0% 13 0 0% 
0 Other 0 0 0% 0 0 0% 
303 Gross Expenditure 349 87 25% 349 0 0% 
0 Income 0 0 0% 0 0 0% 
303 Net Expenditure 349 87 25% 349 0 0% 
£000 £000 £000 % £000 £000 %
467 Employee 502 135 27% 502 0 0% 
0 Property 0 0 0% 0 0 0% 
0 Transport and Plant 2 0 0% 2 0 0% 
0 Supplies, Services and Admin 0 0 47% 1 0 301% 
0 Payments to Other Bodies 0 0 0% 0 0 0% 
0 Other 0 0 0% 0 0 0% 
467 Gross Expenditure 504 136 27% 505 0 0% 
(48) Income (51) (15) 30% (51) 0 0% 
419 Net Expenditure 453 120 27% 454 0 0% 
£000 £000 £000 % £000 £000 %
1,033 Employee 948 325 34% 1,126 178 19% 
0 Property 0 0 0% 0 0 0% 
66 Transport and Plant 124 19 15% 125 0 0% 
23 Supplies, Services and Admin 21 8 39% 52 31 149% 
293 Payments to Other Bodies 472 23 5% 385 (87) -18% 
0 Other 0 0 0% 0 0 0% 
1,415 Gross Expenditure 1,566 375 24% 1,687 121 8% 
(173) Income (158) (128) 81% (246) (88) 56% 
1,242 Net Expenditure 1,407 247 18% 1,440 33 2% 
£000 £000 £000 % £000 £000 %
549 Employee 828 172 21% 828 0 0% 
0 Property 0 0 0% 0 0 0% 
1 Transport and Plant 0 0 0% 0 0 0% 
351 Supplies, Services and Admin 83 83 100% 83 0 0% 
0 Payments to Other Bodies 0 0 0% 0 0 0% 
0 Other 0 0 0% 0 0 0% 
901 Gross Expenditure 911 255 28% 911 0 0% 
(901) Income (911) (255) 28% (911) 0 0% 
0 Net Expenditure 0 (0) 0% 0 0 0% 
Raising Attainment - Primary
Workforce CPD
Performance & Improvement
Education Development
Page 108

Page 109

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION DETAIL
MONTH END DATE 31 July 2022
PERIOD P4
Actual Outturn
2021/22
Total Budget
2022/23
Year to date
2022/23
% Spend to
Date of Total
Budget
Forecast
Spend 2022/23
RAG
Status Forecast Variance 2022/23Service Summary
£000 £000 £000 % £000 £000 %
659 Employee 675 216 32% 675 0 0% 
0 Property 0 0 0% 0 0 0% 
0 Transport and Plant 0 0 0% 0 0 0% 
220 Supplies, Services and Admin 3 3 100% 3 (0) -1% 
100 Payments to Other Bodies 157 0 0% 157 0 0% 
0 Other 0 0 0% 0 0 0% 
979 Gross Expenditure 835 219 26% 835 (0) 0% 
(979) Income (835) (219) 26% (835) 0 0% 
0 Net Expenditure 0 0 0% 0 (0) 0% 
£000 £000 £000 % £000 £000 %
2,204 Employee 731 671 92% 731 0 0% 
8 Property 0 0 0% 0 0 0% 
19 Transport and Plant 0 1 0% 0 0 0% 
719 Supplies, Services and Admin 400 308 77% 400 0 0% 
353 Payments to Other Bodies 60 0 0% 60 0 0% 
0 Other 0 0 0% 0 0 0% 
3,303 Gross Expenditure 1,191 979 82% 1,191 0 0% 
(3,303) Income (1,191) (979) 82% (1,191) 0 0% 
0 Net Expenditure 0 0 0% 0 0 0% 
£000 £000 £000 % £000 £000 %
696 Employee 723 231 32% 725 2 0% 
0 Property 0 0 0% 0 0 0% 
3 Transport and Plant 4 0 8% 4 0 0% 
37 Supplies, Services and Admin 23 3 11% 33 10 42% 
2 Payments to Other Bodies 0 0 0% 0 0 0% 
0 Other 0 0 0% 0 0 0% 
738 Gross Expenditure 749 233 31% 761 12 2% 
(115) Income (129) (12) 9% (141) (12) 9% 
623 Net Expenditure 620 221 36% 620 (0) 0% 
Cultural Services
Raising Attainment - Secondary
Pupil Equity Fund - (PEF)
Page 109

Page 110

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE
PERIOD
Total Budget Forecast
Spend RAG Status
Primary Schools (Laura Mason) 31,800 31,605 (195) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Secondary Schools (Laura Mason) 30,984 31,097 113 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The budget was set before the delay to free school meal expansion was confirmed. As primaries 6 & 7 will now not be covered by universal free school meal
provision income from school meals will be significantly above the budgeted target income (£170k)  The increase clothing grants (£10k) has been offset by a
favourable variance on employee costs (£25k) and property costs (£22k)
None necessary
Income from sale of school meals is currently projected to be less than budgeted (£85k).  The remaining adverse variance is due primarily to a small overspend on
employee costs (25k)
The favourable variance on employee costs may decline if vacancies are filled within the current period of recruitment restrictions.  There is the potential for the
upward pressure on utility costs to increase although the additional income from FSM should offset the consequences of these pressures.
small adverse variance anticipated
Budget Details
Variance Analysis
P4
Forecast Variance
Education
This service area includes all Primary Schools.
Management will continue to review the service and take action where appropriate to minimise the overspend. School meals income depends on higher uptake
from August.
This service area includes all Secondary Schools.
31 July 2022
Page 110

Page 111

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE
PERIOD
Total Budget Forecast
Spend RAG Status Budget Details
Variance Analysis
P4
Forecast Variance
31 July 2022
Additional Support Needs (Claire
Cusick) 16,611 16,651 40 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome adverse variance anticipated
The adverse variance within employee costs  (£67k) is due to a combination of turnover targets not being achieved and greater staffing as part of our efforts to
minimise external placements. Payments to Other Bodies adverse variance is due to the ongoing high demands on the Residential Placements Budget (£525k)
albeit this is partly offset by lower payments to other external bodies (£107k).  Income from other local authorities placing children within WDC schools is expected
to be less than budgeted (£43k). 
This service area covers all ASN Services.
The requirement for Residential Placements is demand-led  and decisions are taken jointly with HSCP following an assessment of the best option for all
concerned. However, the actual usage throughout the year will be reviewed regularly to identify where there is scope to reduce the number of placements.
Page 111

Page 112

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE
PERIOD
Total Budget Forecast
Spend RAG Status Budget Details
Variance Analysis
P4
Forecast Variance
31 July 2022
PPP (Laura Mason) 15,395 15,452 57 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area includes Vale of Leven, Clydebank High and St Peter the Apostle High Schools and St Eunan's Primary School. The costs charged to this
service are Property costs and the Unitary charge.
The adverse variance has arisen due to water rates and contract cleaning costs being greater than when the budget was set.
adverse variance anticipated
Management will continue to review the service and take action where appropriate to minimise the overspend.
Page 112

Page 113

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2022/23 APPENDIX 4
Efficiency
reference
Efficiency Detail budgeted
Amount £
Projection of
Total Saved £
Projection of Total
Not Saved £
Comment
- Reduce Teacher costs 35,467 35,467 - -
35,467 35,467 -  
Page 113

Page 114

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
GENERAL SERVICES CAPITAL PROGRAMME - EDUCATION
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 4
Spend to
Date
Spend to
Date
£000 £000
Red
1 13% 223 1% 1 13% 34 11%
Amber
0 0% 0 0% 0 0% 0 0%
Green
7 88% 29,806 99% 7 88% 276 89%
8 100% 30,029 100% 8 100% 310 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Forecast
Variance Slippage Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
PL CY
199 223 224 25 9 34 34 25 0 25 12% 258%
0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
66,183 29,806 66,183 (0) 5,195 276 5,195 0 0 0 0% 0%
66,382 30,029 66,406 25 5,205 310 5,229 25 0 25
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
TOTAL EXPENDITURE
Projects are forecast to be overspent and/or significant delay to completion
Amber
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
31 July 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects
at RAG
Status
% Project
Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects
at RAG
Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay to completion
Amber
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
Page 114

Page 115

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
Project Life Financials 199 223 112% 224 25 12%
Current Year Financials 9 34 354% 34 25 258%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Oct-22 31-Oct-22
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within amended timescales.
Free School Meals
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project is complete other than snagging works which can only be completed when school is closed however project end date is still on
target. Additional budget required in relation to electrical phasing which was unknown at the time of project inception.
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Page 115

Page 116

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 1,110 198 18% 1,110 (0) 0%
Current Year Financials 441 9 2% 441 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-29 31-Mar-29
2
Project Life Financials 376 335 89% 376 (0) 0%
Current Year Financials 41 0 0% 41 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 20,241 15,083 75% 20,241 0 0%
Current Year Financials 1,005 266 26% 1,005 0 0%
Project Description
Project Manager Sharon Jump/ Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renton Campus: The overall construction was completed as programmed (Previously April 2022 but re-programmed due to 13 week COVID-19
site closure).  Phase 1 of the project was handed over on Monday 18 October 2021, with pupils returning to the new school campus on
Wednesday 20 October 2021. There is an acceleration of spend on this project due to part retention being paid 2022/2023. St Mary's Alexandria
Refurbishment Works (condition survey works, MUGA, Dining & Kitchen extension) anticipated commencement of MUGA is September 2022
which means new build kitchen will slip to June 2023.   Additional ASN Provision – Secondary Phase - Temporary accommodation for Choices
will be in place September and plans for rebuild extension ongoing. Additional scoping in respect of vacant space at Choices and former
Riverside ELC is ongoing.
Mitigating Action
None required
Mitigating Action
None required at this time.
Anticipated Outcome
Increase the Chromebook ratio for most disadvantaged children.
Schools Estate Improvement Plan
Improvement of Schools Estate.
Anticipated Outcome
Project delivered within budget and to the revised programme, following COVID-19.
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Digital Inclusion
Increase the ratio of chrome book devices for most disadvantaged children and families and support for
families with remote access.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Additional devices have been ordered to increase the ratio of devices to pupils as part of a commitment towards a 1:1 device ratio. The project is
on track to be fully spent in 2022/2023.
Main Issues / Reason for Variance
Although there is slippage caused mainly by the academic year starting several months after the financial year the project is still on track to be
completed by the planned end date.
Mitigating Action
None available at this time.
Anticipated Outcome
Purchase of AV Equipment for Education.
AV Equipment - Education
Purchase of AV Equipment for Education.
Planned End Date
Page 116

Page 117

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 29,450 95 0% 29,450 (0) 0%
Current Year Financials 2,797 0 0% 2,797 0 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-26 31-Mar-26
5
Project Life Financials 750 637 85% 750 0 0%
Current Year Financials 113 0 0% 113 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
6
Project Life Financials 5,508 5,505 100% 5,508 (0) 0%
Current Year Financials 3 0 0% 3 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 30-Apr-21
Main Issues / Reason for Variance
Project complete and await final charges.
Mitigating Action
None required.
Anticipated Outcome
Project delivered on time and within budget
Anticipated Outcome
Project delivered on budget.
Schools Estate Refurbishment Plan
Completion of condition surveys has been carried out to identify works required to bring various schools from
Condition C to Condition B.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
A new contractor will be appointed in August 2022 and the programme will be reviewed at that time.
Mitigating Action
None available at this time.
Improvement of Schools Estate.
Planned End Date Forecast End Date
Choices Programme - to assist young people who require additional support
Bringing together Central Support Services which will include relocation of Choices Programme.
Main Issues / Reason for Variance
The next phase of the Schools Estate Improvement Plan involves the development of a new Campus provision in the Faifley area. WDC has
been successful in securing funding from the Scottish Government Learning Estate Improvement Programme. SFT confirmed the indicative
funding allocation for this project at £18.416m on the 4 May 2021, this will be received as a revenue stream over the 25 years of the Scottish
Government financial support (subject to the Council adhering to the funding criteria). Site Options Appraisal has taken place and Members
approved the recommendation to proceed with the new Faifley Campus on the St Joseph's site at Education Committee on 9th June 2021.  The
design team and main contractor have been appointed and the next phase will see the design development for the new Campus taking place.
The statutory consultation process was launched in September 2021 and a report was brought back to the Educational Services committee in
March 2022 concluding the process.
Mitigating Action
None available at this time.
Anticipated Outcome
Delivery of the project will be on time.
Schools Estate Improvement Plan - next Phase - Faifley Campus
Page 117

Page 118

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
7
Project Life Financials 8,748 7,954 91% 8,748 (0) 0%
Current Year Financials 795 1 0% 795 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
The project will be completed to deliver the requirements of the Early Years expansion plans.
Mitigating Action
None required at this time.
Anticipated Outcome
Early Years Early Learning and Childcare Funding
Early learning and childcare funding awarded to West Dunbartonshire Council to facilitate the expansion in
entitlement to funded ELCC to 1140 hours from August 2020.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing and budget spend anticipated in 2022/23.
Page 118

Page 119

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME APPENDIX 8
BUDGET ACCELERATION
PERIOD END DATE
PERIOD 4
Project Name
Original
Budget
£000
Acceleration from
2023/24    £000
Revised
Budget
£000
Spend to
Date
£000
Forecast
22/23 £000 Main Issues
Schools Estate
Improvement Plan 2,020 241 2,261          265 2,261
A request for budget acceleration from
2023/24 has been made for Renton
Primary School due to a part retention
payment which is due this financial year.
31 July 2022
Page 119