Page 1

EDUCATION 
OPTIONS APPRAISAL 
KILCHRENAN PRIMARY SCHOOL 
AUGUST 2023 
Appendix A

Page 2

1.0 INTRODUCTION 
1.1 Immediately before the retiral of the Head Teacher of Kilchrenan Primary
School (PS) in February 2022 there were four pupils residing within the
Kilchrenan catchment area who were still attending the school.  At that point,
the children transferred to Taynuilt Primary School. Three further pupils at
Kilchrenan PS had transferred to St. Columba’s Primary School in Oban at the
start of the 2021-2022 school session. There were no Primary 1 pupils
registered to attend Kilchrenan Primary School in session 2021-22, and one
possible primary 1 enrolment for August 2022. 
1.2 At the Community Services Committee on 10th March 2022, Argyll and Bute
Council approved the mothballing of Kilchrenan Primary School on a temporary
basis. It was agreed that the premises be retained for two years on a care and
maintenance basis and that a review of the school’s mothballing would be
prepared for the Committee’s March 2023 meeting, when Members could
decide on a continued period of mothballing, or request that officers begin an
engagement process, carried out in accordance with the preliminary
requirements of the Schools (Consultation) (Scotland) Act 2010, to consider the
future options for Kilchrenan Primary School.  It was also agreed that the
community would have pre-arranged access to the buildings for community
functions during the period of mothballing.   
(Public Pack)Agenda Document for Community Services Committee,
10/03/2022 10:30 (argyll-bute.gov.uk) 
1.3 On 9th March 2023, Community Services Committee approved the continued
mothballing of Kilchrenan Primary School and agreed that the Education
Service begin gathering necessary information and carry out the exercise of
assessing the options for the future of Kilchrenan Primary School, in
accordance with the preliminary requirements of the Schools
(Consultation)(Scotland) Act 2010. 
(Public Pack)Agenda Document for Community Services Committee,
09/03/2023 10:30 (argyll-bute.gov.uk) 
1.4 The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young
People (Scotland) Act 2014. 
1.5 The Act, as amended, contains a presumption against closure of a rural school
and details specific requirements which the education authority is required to
follow if they are formulating a proposal to close a rural school. This includes
the introduction of a preliminary consultation process. 
1.6 In addition, the Community Empowerment (Scotland) Act 2015 sets out a new
right for community organisations to request the transfer of local assets into

Page 3

local community ownership/management. Public bodies, including councils,
must consider such requests and respond to them within a reasonable
timescale. 
1.7 Kilchrenan Primary School has had no further pupils enrolled since elected
members approved its mothballing. 
1.8 At the aforementioned Committee meeting on 9th March 2023, the Community
Services Committee agreed that the Education Service would undertake the
preliminary requirements as set out in the 2010 Act, and prepare an Options
Appraisal for Kilchrenan Primary School, to enable the Education Service to
identify and consider the options for the school’s future. This document is that
Options Appraisal. 
1.9 The 2010 Act makes special arrangements with regard to rural schools that are,
in effect, a presumption against their closure. There is a requirement to examine
specifically factors particularly relevant to rural schools prior to formulating a
proposal to close a rural school. In particular, it is necessary to consider any
reasonable alternatives before considering closure. It is also necessary to
consider the impact on the wider community of a potential closure, the impact
of any different travel arrangements, and the educational benefits or otherwise
for pupils should a rural school be closed. These factors have been considered
in this Options Appraisal. 
2.0  REASONS FOR THE PROPOSAL 
2.1  An authority that is contemplating formulating a rural school closure proposal
must satisfy the preliminary requirements set out in Section 12A of the 2010
Act before starting to prepare its Proposal Paper. In particular, it must identify
the underlying reasons why the future of the School is being considered, which,
in the case of Kilchrenan Primary School, are as follows: 
1. Kilchrenan Primary School has been mothballed for almost eighteen
months. The school roll is currently zero and is not predicted to rise in the
near future.  
2. Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing, there are 16.29 full-time
equivalent (fte) vacancies across Head Teacher and Teacher posts in Argyll
and Bute. 
3. Whilst the School is mothballed, the building is deteriorating with limited
budgets for maintenance. The costs of continued mothballing, and of
bringing the fabric of the school to the required standard for any re-opening,
are also considerable. 
The Council is therefore considering the future of Kilchrenan Primary School.
The various options are explored within this paper.

Page 4

3.0  BACKGROUND 
Argyll and Bute is an area of outstanding natural beauty, with a strong cultural
identity. Today, the culture of Argyll and Bute is reflected in its traditional
industries of fishing, farming and crofting, sports such as shinty and in its world
class musicians and artists as well as its modern commercial industries such
as wind turbine production and fish farming. 
Argyll and Bute is geographically the second largest authority in Scotland.
Education is delivered in a range of settings including schools, Further
Education, thorough partnerships and via youth services. 
3.1  Argyll and Bute Corporate Plan 
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of
Scotland with outstanding places, people and potential for a prosperous future
for everyone. Our Council, along with our Community Planning Partners, is
committed to ensuring that Argyll and Bute’s economic success is built on a
growing population. 
This strategic approach embraces the vision for our area, our communities and
our people as outlined in the Corporate Plan. Our key service priorities support
the delivery of our commitments in the plan, with focus on local outcomes that
will achieve meaningful improvements for the area, our local communities and
our citizens. 
Councils have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value. Our Community Services Asset
Management Plan provides a review of the property assets used to deliver
services. It incorporates the School Estate Management Plan which reflects the
local implementation of Building Better Schools: Investing in Scotland’s Future,
the national school estate strategy developed by the Scottish Government in
conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within Building
Better Schools are reflected throughout the Education and Children’s Services
Asset Management Plan (SAMP) for schools and public buildings, both in the
management of the existing assets and in the design and construction of new
developments. 
AB_CorporatePlan_3.pdf (argyll-bute.gov.uk) 
3.2  Our Children Their Future

Page 5

Education Authorities, have a statutory duty in terms of the Education
(Scotland) Act 1980 to make adequate and efficient provision of school
education across their entire area for the current school population and future
pattern of demand. This is reflected in Our Children, Their Future: Education
Vision and Strategy. 
argyll_bute_vision_strategy_final_web.pdf (argyll-bute.gov.uk) 
3.3  Kilchrenan and the Local Area - the Kilchrenan Primary School Setting 
Kilchrenan is a village situated in a scenically beautiful area to the west of Loch
Awe, six miles south of the village of Taynuilt, from where it is reached by a
single track road. The area around Kilchrenan features some of the rural
industries with which Argyll and Bute is associated, particularly forestry and
renewables, in the form of wind farms.  Tourism is also a key element of the
local economy.  Other villages in the area, from which children attended
Kilchrenan PS include Dalavich, Inverinan and Ardanaiseig.  A plan to establish
a Regional or National Park around Loch Awe, applications for which are
already in motion, encompasses the whole catchment area for Kilchrenan
Primary School, and is supported and is being promoted by members of the
local community. 
3.4  The School within the Community 
Kilchrenan PS was previously active within the community, as a focus for social
and educational events. The pupils invited the community to attend events on
several occasions every year. During the period of mothballing, there were no
requests for the building to be used for community events. The newly-
refurbished Kilchrenan Village Hall is a community-managed facility that hosts
various community events and activities, and forms the civic hub of the village. 
Some members of the local community in Kilchrenan have expressed interest
in exploring options for a transfer of the school building form the local authority
to the local community, under the terms of the Community Empowerment
(Scotland) Act 2015.  The proposal centres on the use of the school building as
a community drop-in office for small local home-based businesses, and as the
hub for the Kilchrenan Community Council’s campaign to create a Regional or
National Park around Loch Awe, as supported by four further Community
Councils in the Loch Awe area.   
3.5  Population 
Argyll and Bute has an average population density of just 0.13 persons per
hectare. This, coupled with the changing demographic profile of the area,
presents one of our greatest challenges. Accurate 2011 census data for the
specific Kilchrenan Primary School catchment area is not available.  More up-
to-date data is detailed in table 1 below, which contains details from the
National Records of Scotland (NRS) Small Area Population Estimates for the

Page 6

Loch Awe 2 datazone which includes the Kilchrenan catchment area.  It shows
the changing population from 2011 to 2021 for the whole datazone population
and for age groups 0-11, 12-67 and over 67. 
Table 1: Population Information 
Kilchrenan Area (Loch Awe 2 datazone) NRS Population
Estimates
2011 2021
Total Resident Population 637 Total Resident Population 703
Population under age of 12 58 Population under age of 12 54
Population aged 12-67  486 Population aged 12-67 492
Population aged over 67 93 Population aged over 67 157 
It can be seen that the population as a whole in the datazone has increased,
and that the increase is primarily in the 67 plus age-group. The number of
children under the age of 12 has fallen slightly in the last 10 years.  It is
recognised that the datazone area and the catchment area of Kilchrenan
Primary School do not match exactly. The datazone also encompasses part of
the Kilninver Primary School catchment area. 
The map in Figure 1 below shows the extent of the Loch Awe 2 datazone: 
Figure 1 
3.6  Development and House Building 
Loch Awe 2
Datazone

Page 7

A new Local Development Plan (LDP2) is now available, which sets out
planning and development proposals for the next 10 years from 2020, and a
vision for 20 years. The Argyll and Bute Local Development Plan provides the
local planning framework for the Council area, excluding the Loch Lomond and
Trossachs National Park area. The Plan is divided into the written statement
and proposals maps. The written statement provides the general policy context
against which planning applications for new development proposals should be
assessed. This is supported by the proposals maps which show the range of
development opportunities and constraints within the area, for example: 
 the key development areas i.e. the allocations for housing, industry and
business, community facilities and infrastructure;
 the potential areas for future development (Potential Development Areas);
 areas requiring actions such as environmental improvement or regeneration
(Areas for Action); and
 environmental designations such as national Scenic Areas, Sites of Specific
Scientific Interest (SSSIs), Special Protection Areas and Local Nature
Conservation Sites. 
 Appendix 1 shows the LDP2 for Kilchrenan 
 Appendix 2 shows the LDP2 for Taynuilt
 Appendix 3 provides the key for Local Development Plans.
3.7  Kilchrenan Primary School 
Kilchrenan PS is situated in the heart of the village of Kilchrenan and was built
in 1878. The school is co-educational and non-denominational. It has a
catchment area extending from south of Dalavich to north of Kilchrenan,
including Ardanaiseig to the northwest of Kilchrenan. The school comprises two
classrooms and a smaller room which is used for storage and teaching smaller
groups. There is a library/quiet room between the two classrooms and a kitchen
from which the lunches, brought daily from Taynuilt PS, are served. The school
grounds are used as an outdoor classroom, although areas of the grounds are
considered unsafe for pupils to use. 
Appendix 4 shows the Kilchrenan PS Floor Plan. 
Kilchrenan Primary School is 6.7 miles from Taynuilt Primary School, along the
B845, beside which Kilchrenan PS is located. 
The Scottish Government’s Rural School List 2021 classifies Kilchrenan PS as
‘very remote rural’. This is defined as an area with a population of less than
3,000 people, and with a drive time of over 60 minutes to a settlement of 10,000
or more. Kilchrenan Primary is one of 18 primary schools associated with Oban
High School. 
Rural schools in Scotland - gov.scot (www.gov.scot) 
3.8  Taynuilt Primary School

Page 8

Following the mothballing of Kilchrenan PS, children from the Kilchrenan
catchment area have attended Taynuilt PS. Taynuilt PS is a non-
denominational and co-educational school situated in the centre of Taynuilt
village. The present school building opened in 1989. The school
accommodation is of semi-open plan design, with one double and two single
class bays opening onto a shared open area. There is a large gymnasium,
which also acts as an assembly hall, lunch hall and houses the pre-school unit
each afternoon.  In 2008, a purpose built nursery adjacent to the school building
was opened. 
Appendix 5 shows the Taynuilt Primary School Floor Plan. 
The school has strong and active traditions in outdoor learning, the creative
arts, STEM, ITC and in sport and physical activity. The school enjoys the
support of an active Parent Council and strong community partners. 
Like Kilchrenan PS, Taynuilt PS is classified as very remote rural by the
Scottish Government.  The Map in Figure 2 below shows the adjoining
catchment areas of Kilchrenan and Taynuilt Primary Schools: 
Figure 2

Page 9

3.9  Pupil Numbers 
Pupil projections, and data for 2023-24 are based on the 2022 pupil census, a
return prepared annually for the Scottish Government. Past pupil numbers are
historic data taken from past pupil censuses. 
Table 2 shows the historic and current pupil numbers for both Kilchrenan and
Taynuilt Primary schools: 
Table 2  
Kilchrenan PS Taynuilt PS
Capacity 41  163 
Roll Roll
2006-07 23 72

Page 10

2007-08 20 77
2008-09 19 79
2009-10 18 78
2010-11 10 88
2011-12 10 81
2012-13 8 81
2013-14 7 83
2014-15 4 91
2015-16 4 83
2016-17 9 82
2017-18 6 79
2018-19 7 72
2019-20 8 69
2020-21 12 67
2021-22 6 70
2022-23 0 66 
Table 3 shows projected rolls for Taynuilt PS and estimated numbers of pupils
in the Kilchrenan PS catchment area, according to figures held by Argyll and
Bute Council: 
Table 3  
Kilchrenan PS Taynuilt PS  
Roll Roll
Capacity 41 163
2023 -2024 8 58
2024 -2025 8 60
2025-2026 10 55
2026-2027 8 48 
The Kilchrenan PS roll further dropped to zero over the course of the 2021-
2022 school year (see Table 2, above). Pupils within the catchment area (as
set out in Table 3, above) do not reflect the number of pupils  who would be
attending the school because parents choose to send their children to Taynuilt
PS or to the local denominational primary school for the area, St. Columba’s
PS in Oban. 
In August 2022, no primary 1 pupils registered to attend Kilchrenan Primary
School for session 2022-23, and there have been no registrations for session
2023-24.

Page 11

4.0  COMMUNITY ENGAGEMENT 
4.1  Meetings 
A Community Engagement Meeting was held in Kilchrenan Village Hall on 31st
May, 2023 from 09:00-18:00 hours. The meeting’s purpose was to seek the
views of the community on the future of Kilchrenan Primary School. Over the
course of the day, the meeting was attended by 20 people. 
A meeting also took place with the Head Teacher of Taynuilt PS as the formally
assigned receiving school in the event of the closure of Kilchrenan PS, to gauge
the views and of staff on the future of Kilchrenan Primary School. 
There was also a meeting with the Chair of the Parent Council of Taynuilt PS
to gather opinions from parents/carers on the potential impact of any decision
that is made on the future of Kilchrenan PS. 
A virtual meeting also took place with children living in the Kilchrenan catchment
area who now attend Taynuilt Primary School. The purpose of the meeting was
to gather pupils’ views on the future options for Kilchrenan Primary School, and,
where applicable, on their educational provision before and after leaving
Kilchrenan Primary School. 
A number of children from the Kilchrenan PS catchment area attend St.
Columba’s PS in Oban, and movement of pupils from Kilchrenan PS to St.
Columba’s PS in 2021 was one of the reasons for the Kilchrenan roll falling
significantly.  In terms of catchment area, the Kilchrenan area falls within the
catchment for St Columba’s PS in its role as the sole denominational school in
the Oban, Lorn and the Isles area.  Parents/carers within the Kilchrenan
catchment area therefore have the automatic right to enrol their children in St
Columba’s PS.  Meetings with the HT of St. Columba’s PS, the Chair of the St.
Columba’s Parent Council and with the children attending St. Columba’s PS
from the Kilchrenan catchment area were held, to gather their views on the
future of the school. 
4.2  Attendees at the Community Engagement Event and at the other meetings
detailed above were provided with an overview of the information that the
Council would be using in this Options Appraisal.  This included school roll
projections, and information relating to the recruitment and retention of staff,
transport and on local services and facilities. 
The questions put to stakeholders were as follows: 
Over the last 18 months, what has been the effect of mothballing Kilchrenan
Primary School on you, your family and community? 
In your view what are the pros/cons of the following options: 
 Re-open the school
 Continue with mothballing

Page 12

 Re-open the school but widen the catchment area 
 Close the school 
4.3  Feedback 
There was a range of viewpoints on the future of Kilchrenan PS: 
 Community and Parents 
Almost all in the community felt that continuing to mothball the school
was not an option. It was felt that a decision should be made as the
building would only continue to deteriorate, although two parents with
children of pre-school age suggested that mothballing could continue
until such time as the school became a viable option once more,
allowing pre-5 children in the area to get to the stage where they were
ready to attend school. 
Eight of those attending the Community Engagement Event
supported the re-opening the school, only two of whom were parents
of pre-school-aged children who might wish to attend the school,
although some indicated they have families who may wish to move
to the area, and that they wished there to be a school for their
grandchildren to attend in such circumstances.   
Some members of the community were of the view that the
community of Kilchrenan would be negatively impacted by not having
its own primary school. They felt the village would be less attractive
to families who may wish to move to the area.  They also suggested
that attracting people to the area was key to ensuring more affordable
housing for local people was built. The view was expressed by one
attendee that, as a result of children travelling to Taynuilt every day,
they and their parents were already spending significant amount of
time in another community, to the possible detriment of the
Kilchrenan community.  The point was also made that the absence
of a school in Kilchrenan was having a negative impact on the
finances of the Kilchrenan Village Hall, as it was no longer being hired
by the council for PE sessions. 
However, others made clear that they felt that Taynuilt was relatively
close by and offered a school which could still be viewed as being
within the local community, albeit six miles from Kilchrenan. The point
was also made that the present Kilchrenan catchment is not one
single community, Dalavich being eight miles from the school.  As
regards social or more affordable housing, the point was made that
it is the absence of such, and not whether there is or is not a school
in the area, that prevents people from moving into and sustaining the
community, and it is this issue which should be addressed above the
closure or re-opening of the school.

Page 13

Distances to be covered by pupils in getting to school each day was
a further area raised by a minority of attendees. They pointed to
transport issues as a reason for keeping the school open:  the travel
implications for pupils, particularly in the Dalavich area, travelling
daily to Taynuilt were seen as impracticable, and attendance at
school would be prey to adverse weather conditions.  However,
parents of children currently travelling daily to Taynuilt and Oban from
both Kilchrenan and Dalavich said that the weather had also been a
factor prior to the mothballing of the school, and that the now direct
bus journey to Taynuilt, and even to Oban, took less time than the
previous school bus to Kilchrenan, as the latter took a circuitous route
and detours to pick up pupils.  They also pointed out that the majority
of the after-school or evening activities in which children engaged
were in Taynuilt or Oban, and that the journey would therefore have
to be made anyway.  Furthermore, parents were aware that
secondary education would be in Oban, and that the journey would
therefore become a necessity at some point.  Some also spoke of
their own daily commute via Taynuilt, and observed that they were
often able to take their children to school themselves without issue. 
As well as being clear on the advantages of attending a small rural
school, all attendees who wished to the school to be re-opened
nonetheless acknowledged the issues associated with very small
school rolls, and that this was not every parent/carer’s preference. 
They also acknowledged the associated problems with the
recruitment and retention of staff, and the consequences of both
issues for a school’s sustainable future. 
The option of re-opening the school, but with a wider catchment area
was not seen by any attending the Community Engagement Event
as a viable option.  It was acknowledged that this could lead to
increased transport costs for the local authority. It was also felt that
extending the catchment area would not necessarily bring more
pupils to the school, and could also negatively impact on
neighbouring schools which are also small in size. The specific
geography of the area was also seen as making any extension of the
Kilchrenan catchment area non-viable. 
The majority of the community, and all parents attending who had
experience of sending their children to Kilchrenan PS, believed that
the most viable option is to formally close the school, as the decline
in school roll has been a result of parents actively choosing to send
their children to Taynuilt and St. Columba’s Primary Schools. Some
of those in attendance viewed the challenge of recruiting and
retaining high-quality staff as a reason to close the school.  Five
parents of children now attending other primary schools said there
were many identifiable benefits of their children having moved from
Kilchrenan Primary School.

Page 14

Parents/carers of pupils now at other schools pointed to what they
see as a higher quality of educational provision due to less broad
composite classes and more individualised learning and support. 
They also spoke of children now having a greater range of
opportunities across the curriculum, particularly in PE and in practical
subjects. 
A wider scope and choice relating to socialisation and the
development of personal friendship groups and relationships was
also seen as an advantage for pupils who have moved from
Kilchrenan PS. 
The outdoor spaces at Kilchrenan were criticised by some
parents/carers, who pointed out that sections of the outdoor spaces
at the school had been deemed unsafe for pupils to use.  The
facilities available at Taynuilt were praised by parents/carers. 
The absence of catering facilities at Kilchrenan was criticised by
parents/carers, who felt that it restricted the variety, choice and
freshness of food and drink on offer, and that it was not a cost-
effective means of catering for children’s dietary needs. 
The general state of the fabric of Kilchrenan PS, and its recent further
deterioration, was also seen as a negative by parents who had
experience of sending their children there.  The limited accessibility
of the building was also seen as problematic. 
The absence of a breakfast club at Kilchrenan was seen as restrictive
of flexibility for families.  Some parents/carers also spoke of the
absence of wrap-around childcare and registered child minders in the
Kilchrenan area.  They said any increase in flexibility created by
Kilchrenan PS being reopened was negated by the restrictions such
an absence of childcare had on parents’ ability to work. 
The reopening of Kilchrenan PS was also seen by some parents as
having a potentially divisive effect on the local community.  They felt
that, despite reopening, a significant number of parents/carers would
nevertheless continue to choose primary education in Taynuilt or
Oban. Parents spoke of the risk of resentment from those in the
community sending their children to Kilchrenan PS towards those
sending their children elsewhere; being potentially seen as disloyal
to the local community, and putting at risk the long term viability of
the school. 
As part of the engagement around this Options Appraisal, the
parent/carer body at Taynuilt PS expressed its concern about the
falling roll at their school.  From their point of view, the re-opening of
Kilchrenan PS could mean children who would otherwise attend
Taynuilt PS may not do so, and despite the small number of children

Page 15

involved each year, they see the closure of Kilchrenan PS as having
positive consequences  for Taynuilt PS, in terms of pupils numbers
and its effect on the number of classes and teachers, the broadening
of the mix of children in the school, and the number of parents
potentially able to give of their time and resources for the benefit of
the school community. 
 Children/young people 
As part of the pre-consultation on the future of Kilchrenan PS, the
views of children living in the catchment for Kilchrenan PS were
sought.  Of the eight children spoken to in both Taynuilt PS and St.
Columba’s PS, five had had experience of being at Kilchrenan PS. 
Almost all children who could make a comparison spoke of the very
small group of which they were part at Kilchrenan PS. They said that
they had enjoyed this, one pupil saying that the close relationships
were missed, but were glad to have a wider group of peers with whom
to make friends and develop relationships. Two pupils spoke of not
having enough choice of people to play with at Kilchrenan. Two pupils
spoke of how attending Taynuilt PS was preparing them better for
meeting large groups of people in secondary school and beyond.
One pupil said that he was enjoying doing much more group work in
Taynuilt PS. One pupil said that after an argument or if there was a
problem, there were now more people to approach than at
Kilchrenan. 
Almost all children spoke of the better facilities and range of activities
on offer in their new schools, with better PE and more sports on offer. 
Views on the travel from home to Taynuilt or Oban were mixed. One
pupil said the journey was too long, and others acknowledged that
there can be travel problems in bad weather. Others said they had
good fun on the bus and had special “bus friends”. 
When asked to sum up their feelings, only one pupil said that
Kilchrenan should reopen and indicated a wish to return to Kilchrenan
as a pupil.  The other pupils were happy to remain where they were.
Another indicated that the Kilchrenan building was in too poor a state
for it to be used as a school, and it should be made into a sports
centre, with football pitches. 
 Staff 
There was no contact with previous teaching staff from Kilchrenan
PS in the pre-consultation.  The Head Teacher retired in 2022, and
the teacher at the school was redeployed elsewhere.  However, the
views of staff in Taynuilt PS were summarised by the Head Teacher,
who indicated that the enrolment of former Kilchrenan pupils had
been positive for the school and posed no issues in terms of capacity

Page 16

or provision to all learners.  The same view was offered by the Head
Teacher of St. Columba’s PS, within the catchment area of which the
Kilchrenan area falls in terms of denominational educational
provision. 
For details of individual comments made by attendees at the Community
Engagement Event, please see Appendix 4. 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE
PROPOSAL AS CONSIDERED AT THE COMMUNITY ENGAGEMENT
EVENT 
To summarise information provided above, Kilchrenan Primary School has
been mothballed for 18 months. The school roll reduced to zero in February
2022 following the Head Teacher’s retirement, attempts to recruit a
replacement Head Teacher having been unsuccessful. At that point, the
remaining pupils in the school transferred to Taynuilt PS. Their parents’/carers’
view was that the very small school roll was not conducive to the type of
education they sought, and was limiting opportunities for social interaction and
development.  This followed the moving of several pupils to St Columba’s PS
the previous August. The school was mothballed in the period after February
2022, and there have been no attempts to register pupils for primary one, or
any other stage, since then.   
While the building is mothballed it continues to deteriorate. The Community has
been proactive in making positive suggestions as to how the building could be
used. 
Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing, there are 16.29 full-time
equivalent vacancies for both Head Teachers and Teachers across Argyll and
Bute. Recruitment in the Oban, Lorn and the Isles area is challenging due to
the rural location of almost all of its schools. 
Of those who attended the Community Engagement Event on 31st May 2023,
the majority were in favour of closing Kilchrenan PS permanently, including
almost all parents/carers with children in primary education at present. A
minority of attendees wished to see the school re-open, primarily on the
grounds that the community is negatively impacted by the absence of a primary
school, although a small number said they wished their pre-school-aged
children to attend a re-opened Kilchrenan PS. 
The Council is required to consider the future of Kilchrenan PS, taking all factors
and views into account. The following options are explored within this paper: 
a) Re-open Kilchrenan PS;
b) Continue the mothballing of Kilchrenan PS with the pupils zoned to Taynuilt
PS;

Page 17

c) Re-open Kilchrenan PS and realign/extend its catchment area;
d) Close Kilchrenan PS and realign the catchment area for Taynuilt PS to
include the Kilchrenan PS catchment area. 
6.0      OPTION A: RE-OPEN KILCHRENAN PRIMARY SCHOOL 
6.1  Community Feedback 
Eight of those attending the Community Engagement Event supported the re-
opening the school. Their reasoning can be summarised as follows: 
 Parents/carers of children presently under the age of five wish their
children to attend a local school which is within walking distance and
which reflects the local context;
 Residents with no children of school age foresee their families
moving to the area and wish there to be a school for their
grandchildren;
 Community members believe the absence of a school makes it less
likely that the community will be sustained by families moving to the
area;
 Travel to schools outside of the immediate community is
inconvenient, potentially expensive and is at the mercy of adverse
weather conditions. 
6.2 Pupil Numbers 
Table 3 above details the projected roll for Kilchrenan PS. If the school were to
reopen in August 2023, there would be no pupils on the roll, as there are no
children of primary one age in the catchment, and the parents/carers of the
other eight pupils living in the catchment have said they will not move their
children back to Kilchrenan PS, as their children are settled in their schools and
friendships have been established. As stated, the provision at the schools
pupils now attend in Taynuilt and Oban is viewed by those parents consulted
to be preferable to that which was available at Kilchrenan. 
The numbers presently projected to enter primary one, should the school re-
open and should parents decide to send children to Kilchrenan PS, over the
next three years is as follows: 
August 2024 – 1 pupil
August 2025 – 4 pupils
August 2026 – 1 pupil 
Were the school to re-open, a sustainable future for the school may not be
viable unless other parents in the catchment area reversed their decision to
keep their children at Taynuilt PS and St. Columba’s PS, which they have
indicated they will not do. As attendance at Taynuilt PS becomes more of a
norm in the area, and through positive reports of educational provision there, it

Page 18

is not guaranteed that local children attaining primary school age will
automatically attend Kilchrenan PS, placing future viability further in doubt. 
6.3 Financial Information 
The finance to re-open the school, including costs relating to employees,
premises, supplies and services and catering is £150,763. 
In addition, the cost to bring the property to an acceptable standard to re-open
the school is £29,000.   
The annual cost of mothballing Kilchrenan Primary School is £9,888. This does
not include costs related to the transfer of a member of staff to another school,
and the associated over-staffing costs. 
The annual cost of transporting pupils to Taynuilt Primary School during the
mothballing of Kilchrenan PS is £27,295. Were the school to re-open, this cost
would no longer apply, although the previous costs of transporting pupils from
Inverinan, Dalavich and other areas of the catchment would be re-incurred. 
6.4  Assessment of Rural Factors 
Section 12A(2) of the Act requires the education authority to identify its reasons
for the potential closure proposal of a rural school, and consider whether there
are any reasonable alternatives to the proposal which could more suitably
address those underlying reasons. For the proposal and any alternatives
identified, the education authority is required to assess the likely educational
benefits, the likely effect on the local community and the likely effect of different
travelling arrangements. 
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
6.4.1  Community Impact 
The reopening of the school would most likely increase opportunities for
the school premises to be used by the community. It would also be
possible that the school would invite the community to specific events.
The presence of a school and the facilities/activities that may be offered
could make the area a more attractive place to live. Reopening the
school may therefore encourage families with school age children to
move to the community. This in turn may make the community more
sustainable. 
However the community have demonstrated that there is a limited desire
for the school to reopen. Some who attended the Community
Engagement Event indicated the desire for the school to become a hub
for the many local small businesses, and a base for the campaign to
establish a Regional or National Park around Loch Awe, and
subsequently a key facility within it, both of which could have significant
positive impact on the local community.

Page 19

Although still available for such use, Kilchrenan Primary School has not
been used by or for the community since it has been mothballed. The
presence of a newly refurbished village hall near to the school means
that there is an existing, high-quality resource for community events in
the area. 
Other than the points about the school’s role in attracting potential
residents to the area, respondents did not note any negative impact on
the community of the school’s mothballing. 
6.4.2  Travel Arrangements 
The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via
the B845. Travel time is approximately 14 minutes. The B845 is a single
track road, access to which can be limited during adverse winter
weather.   
The travel arrangements for pupils travelling to Taynuilt PS have been
in place since February 2022, and travel by car or bus is an accepted
aspect of living in the communities of Kilchrenan, Inverinan and
Dalavich. If Kilchrenan Primary school were to reopen there could be a
positive impact on the health and wellbeing of some pupils who are able
to walk or cycle to school.  However, the lack of safe walking and cycle
routes and the considerable distances involved would limit this. For
example, it is 8.3 miles from Dalavich to Kilchrenan. Staff would either
travel to the school by car, or if they live locally could walk or cycle. There
may be a positive environmental impact as the use of vehicles to
transport pupils may decrease. Conversely, reopening the school would
mean increased car usage by staff with commensurate negative
environmental impact. 
6.4.3  Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community, ensuring effective learning and teaching
which is matched to such needs. All school in Argyll and Bute implement
Curriculum for Excellence, and there are therefore no specific
educational benefits associated with the re-opening the Kilchrenan PS. 
However, the reopening of the school would entail those local children
choosing to attend being part of a very small school roll, which a number
of parents/carers, and indeed children, in the catchment area viewed as
disadvantageous to educational development for a number of reasons,
including limited social groups and interaction, fewer curricular

Page 20

opportunities and experiences and less individual attention on account
of composite classes covering a wide range of age groups. 
A small number of attendees indicated their views on the potential
benefits of attending a school with a very small roll. 
With respect to outdoor learning, community spaces could be used either
in the school grounds or in the immediate neighbourhood if the school
were to reopen.  Outdoor learning is provided by all schools. 
As a result of the continued mothballing of the building, there would be
issues with respect to the current condition and suitability of the school
buildings and facilities which could negatively impact learning and
teaching.  The building itself, when recovered from its mothballed state,
would still present  the limitations which impacted learning previously,
including issues relating to its accessibility, the safety of its outdoor
spaces and the absence of dedicated PE and catering facilities. 
6.5  Summary 
Of the 20 people who attended the Community Engagement Event, less than
half supported the re-opening of Kilchrenan Primary School. If the school
reopened, the school roll would still be unsustainably low, most likely standing
at a maximum of one, five and six pupils respectively over the next three years,
based on the projected numbers of primary one pupils. 
There are financial implications associated with the reopening of Kilchrenan
Primary School. The total cost of re-opening the school is £150,763, while the
cost of bringing the property to the level and standard required for reopening is
£29,000.  The annual expenditure of £9,888 mothballing costs would no longer
apply. 
If the School were to be reopened, the premises and facilities would be
available for use by the community, in addition to its use as an educational
facility. However, with the village hall being in regular use, this impact would be
limited. The reopening of the School may encourage families with school age
children to move to the community, which may make the community more
sustainable. 
The present pupil travel arrangements have been in place for almost 18
months. Should the school reopen, there may be a positive environmental
impact as the use of vehicles to transport pupils may decrease. Conversely,
there could be increased car usage by staff which may mean travel
arrangements have a negative environmental impact. 
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children.

Page 21

Considering all of the above, re-opening Kilchrenan PS is not considered to be
a reasonable option. 
7.0  OPTION B: CONTINUED MOTHBALLING OF KILCHRENAN PRIMARY
SCHOOL WITH PUPILS ZONED TO TAYNUILT PRIMARY SCHOOL 
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school
and the desirability of maintaining capacity to re-open a school there, but it is
unlikely that it should exceed 3 years in areas that are not very remote.”
Kilchrenan Primary School has been mothballed for almost 18 months. 
7.1  Community Feedback 
Only one attendee was of the view that mothballing of Kilchrenan PS could
continue, to allow children of pre-school age to attend the school once they
attained the required age. All others at the Community Engagement Event who
expressed an opinion felt that mothballing the school over a longer period would
be wasteful due to deterioration of the property, and that a firm decision to close
or re-open the school should be made. 
7.2 Pupil Numbers 
Pupil numbers are not projected to increase over the next four years, as per
Table 3 above.  The table reflects the maximum school roll possible, and does
not take into account the choices of all parents/carers of primary-aged children
to send children to Taynuilt PS or other schools outwith the catchment area by
virtue of making a placing request. 
7.3  Financial Information 
The annual cost of mothballing Kilchrenan Primary School is £9,888. This does
not include costs related to the transfer of a member of staff to another school,
and the associated over-staffing costs.  Neither does this take into account the
cost to bring the property to an acceptable standard for any re-opening of the
school, which is £29,000.   
The annual cost of transporting pupils to Taynuilt Primary School during the
period of mothballing of Kilchrenan PS is £27,295. 
7.4  Assessment of Rural Factors 
Section 12A(2) of the Act requires the education authority to identify its reasons
for the potential closure proposal in relation to a rural school, and consider
whether there are any reasonable alternatives to the proposal which could more
suitably address those underlying reasons. For the proposal and each and any
alternatives identified, the education authority is required to assess the likely
educational benefits, the likely effect on the local community and the likely effect
of different travelling arrangements.

Page 22

The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
7.4.1  Community Impact 
If mothballing of Kilchrenan PS were to continue, pupils would continue
their education at Taynuilt PS, or elsewhere, and there would be no
change to the current impact on the community. The building has not
been used by the community during the period of mothballing, with the
nearby Kilchrenan Village Hall fulfilling the civic requirements of the
community. Furthermore, if the mothballing of Kilchrenan PS were to
continue, the building would deteriorate further, with the result that it may
not be available for community use under any circumstances. 
Some members of the community view the buildings and grounds as an
opportunity to develop a local small business hub, and as both a base
for the campaign to create a Loch Awe Regional/National Park, and a
key facility within such a park should it be established. Continued
mothballing would stall any such developments, or any alternative plans
for the building brought by the local community.   
It can therefore be seen that to continue to maintain KIlchrenan PS in its
mothballed state will have no positive impact on the local community,
which is reflected in the views of almost all those consulted during the
preliminary engagement exercise. 
7.4.2  Travel Arrangements 
The continuation of the mothballing of Kilchrenan PS would entail no
change to the travel arrangements for children that are currently in place,
nor to the environmental impact of such travel arrangements, both of
which are detailed in section 6.4.2 above. 
7.4.3  Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community. All schools in Argyll and Bute implement
Curriculum for Excellence, ensuring effective learning and teaching
which is matched to such needs.  For these reasons, the continued
mothballing would bring no specific educational benefits for pupils. 
The continued mothballing of Kilchrenan PS would continue the
arrangements which have been in place for the last 18 months. 
However, any continued deterioration in the fabric and fittings of the
school building as a result of mothballing would exacerbate the issues

Page 23

associated with re-opening, as described in section 6.4.3 above, and
their potentially negative impact on the quality of educational provision
in the building in any future scenario. 
7.6  Summary 
Almost all of those who attended the Community Engagement Event were
against continuing the 18 month mothballing of Kilchrenan Primary School.
There was a view that mothballing the school over a long period was wasteful
due to deterioration of the property and the costs involved, and that a decision
to close or re-open the school should be made. 
The current annual cost (2022/23) to the Council of the mothballed Kilchrenan
Primary School is £9,888. This includes electricity, heating oil, and ground
maintenance, building maintenance and repair costs.  It does not include the
cost of over-staffing in another school to which the member of Kilchrenan’s staff
transferred. Neither does it take into account the cost to bring the property to
an acceptable standard should mothballing be followed by re-opening of the
school, which is £29,000.  Continuation of mothballing would mean no change
to the annual transport cost of taking pupils to alternative schools, which is
£27,295. 
The present travel arrangements have been in place for 18 months. Should the
school continue to be mothballed these travel arrangements would continue. 
There are no specific educational benefits from continuing the mothballing of
Kilchrenan Primary school. 
On the basis that pupil numbers are not expected to increase and the building’s
mothballing is not of benefit to the community or the Council, continued
mothballing of Kilchrenan Primary School is not viewed as a reasonable option. 
8.0  OPTION C: RE-OPEN KILCHRENAN PRIMARY SCHOOL AND EXTEND ITS
CATCHMENT AREA 
8.1  Community Feedback 
As detailed in the map at Section 3.8 above, the existing catchment area for
Kilchrenan Primary School is very rural and very sparsely populated. It already
covers a broad area, characterised by small communities which are mostly
situated along a single road over a distance of approximately 13 miles.  This
linear aspect to the geography of the catchment area, and the absence of any
further significant habitation immediately to the south of the existing catchment
areas – the only direction in which the catchment area could realistically be
extended – means that there is limited scope for increasing the catchment area.

Page 24

Were the catchment area to be extended to the north, towards Taynuilt, again,
this would include very few dwellings, and, depending on the extent of the
extension, would impinge on the intake for Taynuilt PS, as would any significant
southwards extension on Kilmartin PS. This could have negative consequences
for staffing in these schools should their rolls fall to any degree. Loch Awe to
the east and inaccessible, unpopulated land to the west make any extension in
those directions unviable. 
All those attending the Community Engagement Event felt that extending the
catchment area was an unrealistic proposal for Kilchrenan Primary School. The
community felt that moving the boundary in any of the ways described above
would add very few, if any, pupils to the roll, and could increase transport
distances and times. 
8.2  Pupil Numbers 
It is very unlikely that the establishment of any new catchment area would
increase the potential roll of Kilchrenan PS, particularly as there is no guarantee
that children living in any newly-extended catchment area would necessarily
attend Kilchrenan PS – as placing requests can be made for children to attend
schools other than their catchment school. 
8.3  Financial Information 
The finance required to re-open the school, including costs relating to
employees, premises, supplies and services and catering is £150,763 
In addition, the cost to bring the property to an acceptable standard to re-open
the school is £29,000.   
There would also be a financial cost associated with the transport to school of
pupils within a larger catchment area. 
8.4  Assessment of Rural Factors 
Section 12A(2) of the Children and Young People (Scotland) Act (2014)
requires the education authority to identify its reasons for the closure proposal
of a rural school, and consider whether there are any reasonable alternatives
to the proposal which could respond to those reasons. For the proposal and
each and any alternatives identified, the education authority is required to
assess the likely educational benefits, the likely effect on the local community
and the likely effect of different travelling arrangements. 
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report.

Page 25

8.4.1  Community Impact 
The reopening of the school with a larger catchment area would increase
opportunities for the premises to be used by the community. It would also
be a possibility that the school pupils would invite the community to
specific events. The presence of a school and the facilities/activities that
may be offered could make the area a more attractive place to live.
Reopening the school may therefore encourage families with school-age
children to move to the community. This in turn may make the community
more sustainable. 
However the community have demonstrated that there is a limited desire
for the school to reopen. Some who attended the Community
Engagement Event indicated the desire for the school to become a hub
office for the many local small businesses, and a base for the campaign
to establish a Regional or National Park around Loch Awe, both of which
could have significant positive impact on the local community. 
Although still available for such use, Kilchrenan Primary School has not
been used by or for the community since it has been mothballed. The
presence of a newly refurbished village hall near to the school means
that there is an existing, high-quality resource for community events in
the area. 
Other than the points about the school’s role in attracting potential
residents to the area, which could benefit the community’s economy and
sustainability, those consulted did not note any negative impact on the
community of the school’s mothballing. 
8.4.2  Travel Arrangements 
The travel distance from Kilchrenan Primary to Taynuilt Primary is 6.7
miles via the B845. Travel time is approximately 14 minutes. The B845
is a single track road, access to which can be limited during adverse
winter weather.   
The travel arrangements for pupils travelling to Taynuilt PS have been
in place since February 2022, and travel by car or bus is an accepted
aspect of living in the communities of Kilchrenan, Inverinan and
Dalavich. If Kilchrenan Primary school were to reopen with a wider
catchment area, there could be a positive impact on the health and
wellbeing of some pupils who are able to walk or cycle to school. 
However, the lack of safe walking and cycle routes and the considerable
distances involved would limit this. For example, it is 8.3 miles from
Dalavich to Kilchrenan, and the extension of the catchment area could
extend distances to school for pupils within the catchment to over 10
miles. Staff would either travel to the school by car, or if they live locally
could walk or cycle. There may be a positive environmental impact as
the use of vehicles to transport pupils may decrease. Conversely,
reopening the school with a wider catchment area would mean increased

Page 26

car usage by staff, and greater distances for pupils to travel to school by
vehicle, with commensurate negative environmental impact. 
8.4.3  Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community. There are no specific educational benefits
associated with the re-opening the Kilchrenan PS with a wider catchment
area, as all schools implement Curriculum for Excellence, ensuring
effective learning and teaching which is matched to the needs of
children. 
However, the reopening of the school, albeit with an extended catchment
area, would still mean those local children choosing to attend were part
of a very small school roll, which a number of parents/carers, and indeed
children, in the catchment area viewed as disadvantageous to
educational development for a number of reasons, including limited
social groups and interaction, fewer curricular opportunities and
experiences and less individual attention on account of composite
classes covering a wide range of age groups. 
A small number of those consulted indicated the potential benefits of
attending a school with a very small roll. 
With respect to outdoor learning, community spaces could be used either
in the school grounds or in the immediate neighbourhood if the school
were to reopen.  Outdoor learning is provided by all schools. 
As a result of the continued mothballing of the building, there would be
issues with respect to the current condition and suitability of the school
buildings and facilities which could negatively impact learning and
teaching.  The building itself, when recovered from its mothballed state,
would still present  the limitations which impacted learning previously,
including issues relating to its accessibility, the safety of its outdoor
spaces and the absence of dedicated PE and catering facilities. 
8.5 Summary 
Of the 20 people who attended the Community Engagement Event, none
expressed support for the re-opening of Kilchrenan Primary School with an
extended catchment area. 
All who reflected on the option acknowledged that the unique geographical
character of the area makes an extension unviable.  They saw it as unlikely that
any extension of the catchment area would increase the school roll, as there
are few dwellings that could be included in such an extension.  Pupils now
attending Taynuilt PS or St. Columba’s PS would be very unlikely to transfer

Page 27

back to Kilchrenan PS, and those families included in a newly-extended
catchment area may wish their children to remain in the school they presently
attend.  Therefore, if the school reopened with an extended catchment area,
the school roll would most likely still be unsustainably low. 
There are financial implications associated with the reopening of Kilchrenan
Primary School with an extended catchment area. The total cost of re-opening
the school for educational provision is £150,763, while the additional cost of
bringing the property to the level and standard required for reopening is
£29,000.  The annual expenditure of £9,888 mothballing costs would no longer
apply. Additional transport costs could also be incurred by the local authority. 
If the School were to be reopened with an extension of the catchment area, the
premises and facilities would be available for use by the community, in addition
to its use as an educational facility. However, with the village hall being in
regular use, this impact would be limited. The reopening of the school may
encourage families with school age children to move to the community, which
may make the community more sustainable. 
The travel distance and time from Kilchrenan PS to Taynuilt PS is 6.7 miles in
14 minutes, via the B845. Adverse weather can be a factor, however this is no
different to other rural schools and areas. The present pupil travel
arrangements have been in place for almost 18 months. Should the school
reopen with an extended catchment area, there may be a positive
environmental impact as the use of vehicles to transport pupils may decrease.
Conversely, there could be increased car usage by staff, and further for pupils
to travel by vehicle, which may mean travel arrangements have a negative
environmental impact. 
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Considering all of the above, reopening Kilchrenan PS with an extended
catchment area is not considered to be a reasonable option.
9.0  OPTION D: CLOSE KILCHRENAN PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR TAYNUILT PRIMARY SCHOOL TO INCLUDE
THE CURRENT KILCHRENAN CATCHMENT AREA 
9.1  Community Feedback 
The majority of people who attended the Options Appraisal meeting were not
in favour of re-opening Kilchrenan PS as a school, and saw closure as the only
viable option.  Parents/carers of school-age children commented that the
mothballing of the school after the roll fell to zero in February 2022 was a result
of parental choice – several pupils had left the school at the beginning of the
2021-22 school session, transferring to St Columba’s PS, and the remaining
pupils moved to Taynuilt PS on the retirement of the Head Teacher in February
2022.  Parents spoke of their greater satisfaction with the overall educational
provision in their children’s new schools. Among the key reasons for this were

Page 28

less broad composite classes, more focus on children’s individual learning
needs, a wider social mix and increased choice in terms of friendship groups,
wider curricular opportunities and a greater range of sports and activities on
offer.  Parents acknowledged the benefits of a small and close school
community, but pointed out both that Taynuilt is not too far away, and that there
are already great physical distances within the Kilchrenan catchment area. 
Some parents also said that the travel arrangements involved in getting to
Kilchrenan each day were not greatly different from those involved in getting to
their present schools in Taynuilt and beyond. 
Parents also felt that the absence of wrap-around childcare and child minders
in the Kilchrenan catchment area negated any benefits of there being a school
in Kilchrenan, as travel beyond Kilchrenan was required to access such
services, allowing parents to work. 
Some members of the community spoke of their active intentions to repurpose
a closed Kilchrenan PS for the benefit of the community. They wish to use the
school as a hub office for local small businesses, and as a base for the
campaign to establish a Regional/National Park in the Loch Awe area, as well
as a key facility in the park if it is subsequently established. 
9.2  Pupil Numbers 
Table 4 below details the occupancy level for Taynuilt PS over the next four
years as a percentage of its maximum capacity, taking into account the likely
intake of pupils from the present Kilchrenan PS catchment area were
Kilchrenan PS to be closed. 
Table 4: School Occupancy 
2023/24 2024/25 2025/26 2026/27
Approved
Capacity
Taynuilt PS
163 163 163 163
Projected
Roll
Taynuilt PS
58 60 55 48
Kilchrenan
PS
Projected
Roll
8 8 10 8
Maximum
Roll
Projection
Taynuilt
Primary
66 68 65 56
Taynuilt PS
Occupancy
%
40% 42% 40% 34%

Page 29

Should Kilchrenan PS close, pupils from the Kilchrenan PS catchment area
would attend Taynuilt PS, other than any pupils choosing denominational
education at St. Columba’s Roman Catholic PS, in the catchment for which
Kilchrenan lies. There is a declining trend in the school roll at Taynuilt PS and
the predicted occupancy rate for Taynuilt PS varies between 42% and 34%
over the next four years.  There are no issues associated with the capacity of
Taynuilt PS to receive pupils from the present Kilchrenan catchment area, and
such a scenario can be seen as beneficial to the Taynuilt PS school community. 
9.3  Financial Information 
Since the mothballing of Kilchrenan PS, there has been a bus service for pupils
travelling to Taynuilt PS, at an annual cost of £27,295. The closure of
Kilchrenan PS would therefore not incur any additional transport cost. It is
possible that the closure of Kilchrenan PS and the establishment of Taynuilt PS
as the catchment school could result in a gradual reduction of the numbers of
pupils attending St. Columba’s PS in Oban.  Were this service from the
Kilchrenan/Dalavich district no longer required, a saving on transport to St.
Columba’s PS may be possible. At present, the cost of transporting pupils to
St. Columba’s PS from the Kilchrenan catchment area is £26,726 annually. 
If Kilchrenan Primary School were to be closed it would generate an annual
saving of £9,888, the current annual cost of mothballing (2022-23) not including
the cost relating to overstaffing in another school as a result of staff transfer
from Kilchrenan. The potential cost of reopening the school, totalling £150,763
on an ongoing annual basis, plus £29,000 to bring the building up to the
required standard for reopening, would also require no further consideration. 
9.4  Assessment of Rural Factors 
Section 12A(2) of the Children and Young People (Scotland) Act (2014)
requires the education authority to identify its reasons for the closure proposal
of a rural school, and consider whether there are any reasonable alternatives
to the proposal which could respond to those reasons. For the proposal and
each and any alternatives identified, the education authority is required to
assess the likely educational benefits, the likely effect on the local community
and the likely effect of different travelling arrangements. 
The reasons why the future of Kilchrenan Primary School is being considered
are as stated at Section 2 of this Report. 
9.4.1  Community Impact 
If Kilchrenan PS were to close, pupils would continue their education at
Taynuilt PS – the catchment area of which would incorporate the present
Kilchrenan catchment area – or elsewhere, and there would be no
change in terms of the current impact on the community. The Kilchrenan
school building has not been used by the community during the period
of mothballing. The nearby Kilchrenan Village Hall fulfils a wide range of

Page 30

civic requirements in the area, and is newly-refurbished, well-equipped
and community-co-ordinated. 
Some members of the community view the buildings and grounds as an
opportunity to develop a local small business hub, and as both a base
for the campaign to create a Loch Awe Regional/National Park, and a
key facility within such a park if established. The closure of the school
would permit the local community to take such ventures forward, under
the terms of the Community Empowerment (Scotland) Act 2015. Such a
re-purposing of the building could potentially have a very positive impact
on the economy and sustainability of the community in the longer term. 
The closure of the school may have a negative impact on the numbers
of those with children considering a move to the area, a concern held by
some of those who attended the Community Engagement Event.  This
could have an adverse effect on the sustainability of the local community,
although others pointed to a lack of affordable housing being the greatest
issue for community sustainability.   
Other than the possible role of the reopened school attracting new
residents to the area, attendees at the Community Engagement Event
did not detail any further negative consequences of the school being
closed. 
9.4.2  Travel Arrangements 
The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via
the B845. Travel time is approximately 14 minutes. The travel
arrangements have been in place for 18 months. Travel is an accepted
aspect of living in the Kilchrenan community and the occasional issues
relating to adverse winter weather are acknowledged. The option to
close the school would have no effect on the current travel
arrangements of staff and pupils, the associated costs or the
environmental impact of travel. 
9.4.3  Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers in exercising freedom and responsibility in
their practice, within the context of broader guidance. This means that
schools are able to design their curriculum to meet the specific needs of
their children and community. There are no specific educational benefits
associated with the closure of Kilchrenan PS, as all schools in Argyll and
Bute implement Curriculum for Excellence, ensuring effective learning
and teaching which is matched to the needs of children. 
Scottish Government classification defines both Kilchrenan PS and
Taynuilt PS as remote rural schools. However, Taynuilt PS has a more
accessible location in a larger village. Children from the Kilchrenan area,
attending Taynuilt Primary School are benefitting from learning with a

Page 31

greater number of peers of the same age and stage as themselves, as
opposed to experiencing a single, multi-composite classroom. Pupils
also benefit from the increased friendship groups that a larger school
can offer, and from being part of a social context in which they can build
relationships with different groups and individuals, develop social skills,
meet challenges and exercise responsibilities as members of a social
group. They are able to interact and socialise with larger groups of
children, take part in team activities and move with an established group
of friends and peers to secondary school at Oban High School. 
In interview, two pupils spoke of not having enough choice of people to
play with at Kichrenan. Two pupils spoke of how attending Taynuilt PS
was preparing them better for meeting large groups of people in
secondary school and beyond. One pupils said that he was enjoying
doing much more group work in Taynuilt PS. One pupil said that after an
argument or if there was a problem, there were now more people to
approach than at Kilchrenan. 
Almost all children spoke of the better facilities and range of activities on
offer in their new schools, with better PE and more sports on offer. 
9.5  Summary 
From those who attended the community engagement event, there was
majority support for the closure of Kilchrenan PS as a school, and realigning
the catchment area of Taynuilt PS. 
The projected roll for Taynuilt PS ranges between 42% and 34% of the school’s
maximum capacity over the next four years.  Upon the closure of Kilchrenan
PS, the intake of a small number of children from the previous Kilchrenan
catchment area will put no pressure on the school’s capacity, and will be
positive for the school in terms of the greater mix of children attending, the
potential input of additional engaged parents and the potentially positive impact
on the school’s staffing. 
The closure of Kilchrenan PS would incur no increased annual transportation
costs, and the annual costs of maintaining the school building in its mothballed
state, £9,888, would be saved by the council. The projected substantial costs
of re-opening the school would require no further consideration. 
Travel arrangements to Taynuilt PS, which almost all children and their parents
have deemed to be satisfactory, are already in place for children within the
Kilchrenan catchment area, and would continue should Kilchrenan PS be
closed. There would be no clear negative environmental issues associated with
the closure of the school.  The vehicular transport arrangements would remain
as they are. 
In Taynuilt PS, children benefit from a positive learning environment, and from
learning and teaching which is matched to the needs of the young people who
attend the school. In addition there are more opportunities for personal and

Page 32

social development, and for access to a potentially broader range of learning
experiences and activities. 
After consideration of all that has been discussed above, the closure of
Kilchrenan PS and the realignment of the Taynuilt PS catchment area to include
the present Kilchrenan catchment area has been identified as a reasonable
option for further consideration and consultation.       
10.0  OVERVIEW OF OPTIONS 
Option Option Description Outcome
A Re-open Kilchrenan Primary School with
the existing catchment area.
Not a reasonable option.
B Continued Mothballing of Kilchrenan
Primary School with the pupils zoned to
Taynuilt Primary School. 
Not a reasonable option.
C Re-open Kilchrenan Primary School and
extend its catchment area.
Not a reasonable option
D Close Kilchrenan Primary School and
realign the catchment area of Taynuilt
Primary School to include the current
catchment area for Kilchrenan Primary
School.
A reasonable option, with
consideration given to the
present school building
becoming a facility the
community can develop
for its benefit and
sustainability. 
11.0  ANALYSIS OF REASONABLE OPTION: CLOSE KILCHRENAN PRIMARY
SCHOOL AND REALIGN THE CATCHMENT AREA FOR TAYNUILT
PRIMARY SCHOOL TO INCLUDE THE CURRENT KILCHRENAN
CATCHMENT AREA 
11.1 The closure of Kilchrenan PS, and the realignment of the Taynuilt PS catchment
area to include the current Kilchrenan catchment area, is assessed to be the
only reasonable option to be presented to members at committee, and, if
approved, to subsequently progress to formulation of a “relevant proposal”
under the Schools (Consultation) (Scotland) Act 2010, as amended by the
Children and Young People (Scotland) Act 2014. 
This section of the report both summarises and provides more information on the
key factors considered in such an assessment, and goes into significant detail

Page 33

regarding the educational benefits of closing Kilchrenan PS, particularly as
regards the educational provision offered by Taynuilt PS. 
11.2 Pupil Projections  
As detailed above, the realignment of the Taynuilt PS catchment area to include
that of Kilchrenan PS, and the subsequent enrolment of additional pupils, will
not substantially affect the school occupancy in relation to the school’s
maximum capacity.  As detailed in the table below, the predicted occupancy
rate for Taynuilt PS varies between 42% and 34% over the next four years. 
There are no issues associated with the capacity of Taynuilt PS to receive
pupils from the present Kilchrenan catchment area, and such a scenario can
be seen as beneficial to the Taynuilt school community. 
2023/24 2024/25 2025/26 2026/27
Approved
Capacity
Taynuilt PS
163 163 163 163
Projected
Roll
Taynuilt PS
58 60 55 48
Kilchrenan
PS
Projected
Roll
8 8 10 8
Maximum
Roll
Projection
Taynuilt
Primary
66 68 65 56
Taynuilt PS
Occupancy
%
40% 42% 40% 34% 
11.3  Assessment of Rural Factors 
11.3.1  Educational Benefits 
Learning and Teaching 
The following focuses on learning and the curriculum at Taynuilt PS, which is
the school most Kilchrenan PS pupils have been attending since February
2022, and would be the future receiving school for children presently living
within the Kilchrenan PS catchment area. 
The curriculum at Taynuilt PS includes a broad range of planned experiences,
to help every child and young person to develop knowledge, skills and attributes
for success in learning, life and work.

Page 34

In Taynuilt PS, children are encouraged to be eager and active participants who
are engaged, resilient and highly motivated during their learning. Children know
that their views are sought, valued and acted upon. The learning environment
encourages a high level of achievement, providing a wide range of opportunities
for children to achieve their full potential within the four contexts of learning –
curriculum areas and subjects, interdisciplinary learning, the ethos and life of
the school and opportunities for personal achievement. 
In Taynuilt PS, children are taught in composite classes composed of children
from no more than two year groups. Children benefit from being part of a social
context in which they can build relationships with different groups and
individuals, develop social skills, meet challenges and exercise responsibilities
as members of a social group. They are able to interact and socialise with
groups of children through a variety of learning activities, as well as take part in
team activities and move with their peers to secondary school. 
There is a continual challenge for all schools to deliver a school improvement
agenda and deliver effectively the principles and outcomes of curriculum for
excellence. The National Improvement Framework priorities include raising
attainment for all, and closing the gap between the most and least
disadvantaged children.   
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising autonomy, creativity and
responsibility, in the context of broader guidance. This means that schools are
able to design their curriculum to meet the specific needs of their children and
community. The Head Teacher of Taynuilt Primary School leads a team of staff
who are challenged and supported through a range of continuing professional
review and development opportunities. The school is part of the Oban Lorn and
the Isles Schools Cluster, which means that staff can be supported to work
together, moderation and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within Taynuilt Primary School
are able to support and challenge each other on a daily basis. The whole staff
are able to bring a range of talents and skills to benefit outcomes for learners. 
Taynuilt PS has been focusing strongly on the development children’s
understanding of their rights – their role in wellbeing, sustainable living and
school improvement – and working towards Rights Respecting School
accreditation.  A further key focus for the school is the empowerment of
parents/carers in shaping and participating in policy, learning and the life and
ethos of the school through a strong parent council and a vibrant parental voice. 
A third improvement focus for the school community has been to develop
further the use of self-evaluation and attainment data to inform improvement
planning at whole-school level, and to support appropriate, effective, timely 
interventions for children in their learning and attainment. Other ongoing
improvement priorities include supporting digital learning, developing Reading
through targeted interventions, supporting progress in Numeracy through the
use of Stages in Early Arithmetical Learning, and promoting Pupil Leadership

Page 35

of activities and initiatives, and ownership of and engagement with their own
learning. 
Taynuilt PS encourages outdoor learning activities and learning through play.
Partnership working with local employers and the Parent Council has helped to
develop resources and outdoor learning zones to support this approach.  The
poly-tunnel supports children’s understanding of health and wellbeing, bio-
diversity and sustainability. 
Taynuilt PS is in a village location within Taynuilt, which, like Kilchrenan Primary
School, is classed as a very remote rural school. The Head Teacher has a
strong understanding of the rural communities that the school serves.   
Taynuilt PS has its own linked ELC on site, with which it coordinates an active
transition calendar.  The school also has strong links with Oban High School
with which it liaises, alongside all other OLI schools, throughout the year to
ensure a smooth transition for P7 pupils into S1. 
Outcomes 
Through the GIRFEC practice model, meeting the needs of every child
continues to be a priority and teachers carefully plan and assess to ensure each
child has the opportunity to reach their potential. Careful tracking and
monitoring procedures are in place to evidence pupil progress. This includes
professional dialogue with teachers, learning discussions with children,
classroom observations, assessment and analysis of pupil work. As a result of
such practice, appropriate interventions are put in place, involving
parents/carers and other agencies to ensure the needs of each child are met. 
In Taynuilt PS, most children are achieving the expected levels for their stage
in Reading, Writing, Listening and Talking and Numeracy. The attainment of
children at Taynuilt PS is strong: between 2019 and 2022, attainment levels for
P1, P4 and P7 pupils at Taynuilt PS in Numeracy and across the three areas
of Literacy were above the Argyll and Bute and National averages. 
Taynuilt PS continues to develop positive relationships within the school
through a focus on Nurture and Rights Respecting Schools. The larger staff,
parent/carer body and partner group of the school naturally increases the
breadth of talent and interest that may be available to share within a school
setting. This applies both in terms of the wider curriculum and within aspects of
the curriculum that may be enhanced by staff individual expertise e.g. PE,
language, science, expressive arts teaching. 
Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which help them
develop the knowledge and understanding, skills, capabilities and attributes
which they need for their mental, emotional, social and physical wellbeing both
now and in the future. Taynuilt PS has been evaluating its community links as

Page 36

part of its Covid Recovery Plans, providing enhanced opportunities for social
interaction and skills development. 
Environment for Learning 
Taynuilt PS is a suitably-equipped and well supported school, situated in village
of Taynuilt. The school building is graded highly suitable for effective
educational provision (Suitability Rating A) and the grounds and surroundings
are extensive and attractive, providing ample space for play and outdoor
learning. The building has facilities for pupils and visitors with special access
needs. 
11.3.2 Community Impact 
While there was some variance of community views at the Community
Engagement Event, the majority of attendees supported closure of Kilchrenan
PS. 
It is understood that a school closure may have an effect on the community’s
sustainability, as a result of families with children being put off moving into the
area. However, members of the local community are being proactive in
developing proposals for the Kilchrenan school building, which, if fulfilled, could
have a positive effect on the economy and sustainability of the area and
community.  Present proposals are to request the transfer of the Kilchrenan PS
building into local community ownership/management under the terms of the
Community Empowerment (Scotland) Act 2015.  It is proposed that the building
become a hub office for local small businesses, and a centre for the campaign
to establish either a new Regional or National Park in the Loch Awe area, the
application processes relating to which are already underway. Should a park
be established at regional or national level, it is envisaged that the school
building could become a key facility within the park infrastructure. The formal
closure of the school would allow such plans to progress. 
Any civic role which the school building may have previously played in the
Kilchrenan community, or which it could continue to play were it to remain open,
can be adopted by the Kilchrenan Village Hall, which is run and co-ordinated
by local community members. Having been recently refurbished, the hall is well
equipped to play a key role in staging key local events and activities, and is
doing so effectively. 
The closure of Kilchrenan PS could have positive consequences for the future
of Taynuilt PS, and by extension, the community of Taynuilt. Against the
backdrop of a school roll at Taynuilt which is projected to fall in coming years,
even a small increase in the number of pupils coming to the school as a result
of the closure of Kilchrenan could have benefits in terms of the school’s staffing
complement, the number of composite classes, the mix and diversity of the
pupil cohort and the number of parents potentially able to contribute to the life
and work of the school. 
11.3.3 Travel Arrangements

Page 37

Travel by vehicle is an accepted aspect of living in the Kilchrenan community,
and there were already considerable transport considerations for those
travelling from Inverinan or Dalavich to Kilchrenan before Kilchrenan PS was
mothballed. 
The travel distance from Kilchrenan PS to Taynuilt PS is 6.7 miles via the B845.
Travel time is approximately 14 minutes. The travel arrangements for pupils in
the Kilchrenan catchment area travelling to Taynuilt have been in place for 18
months. Occasional issues relating to adverse winter weather are
acknowledged. The option to close the school would have no effect on the
current travel arrangements of staff and pupils, the associated costs to the
Council or families or the environmental impact of travel. 
11.4  Financial Impact 
The main elements included within a school budget are teacher employment
costs (basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government Employee costs and an allocation for discretionary expenditure
incurred by the school (educational equipment, materials, staff travel, etc.). 
Teacher staffing budgets are calculated on an annual basis and within the
Primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of pupils in each school. When a school ceases to be operational, the
teacher staffing budget is adjusted (at the appropriate time), as per entitlement
information from Education HR, with the staffing budget resulting in a nil value. 
As a result of the authority’s policy for no teacher redundancies, it is presumed
that the staff will be deployed elsewhere within the authority and therefore their
salary costs still exist, and there is an increase to the receiving school’s budget.
This is also in line with the national priority of maintaining teacher numbers.
This methodology also applies to the school’s discretionary budget which again
is formula-based.  The budget of the receiving school, in terms of any pupils
being transferred, will increase. The figures outlined below take account of the
fact that the staffing and discretionary budgets for Kilchrenan PS have been
adjusted to nil. 
The annual running costs during mothballing of Kilchrenan Primary School are
£9,888.  Therefore, annual savings generated through closing Kilchrenan
Primary School would be £9,888. 
The costs/savings outlined above assumes all revenue expenditure would
cease. This includes non-domestic rates, utility costs, insurances, etc. If the
school were to be formally closed, this would allow the council to take steps
towards selling the school premises to a third party or progressing its handover
to local community groups under the terms of the Community Empowerment
(Scotland) Act 2015. 
11.5  Environmental Impact

Page 38

Pupils currently travel to Taynuilt PS. The option to close Kilchrenan PS would
have no further environmental impact, and would have no impact on the current
travel arrangements for staff and pupils. Travel to access services and
amenities is an accepted aspect of rural life. 
12.0  CONCLUSION 
Four alternative options have been reviewed in considering the future of
Kilchrenan Primary School. For each option, information was collated and
consideration was given to: 
 Community feedback;
 Pupil numbers; 
 Financial Information;
 Assessment of rural factors, including community impact, travel
arrangements, and educational benefits. 
An authority that is contemplating a rural school closure proposal must satisfy
the preliminary requirements set out in Section 12A of the 2010 Act before
formulating a proposal. 
After consideration of the preliminary requirements, as set out in the Act, and
the options, and having regard to the specific reasons identified at Section 2 of
this report, closing Kilchrenan Primary School and realigning the catchment area
of Taynuilt Primary School to include the current catchment area for Kilchrenan
Primary School has been identified as the most reasonable option to address
the underlying reasons for the proposal. 
Members are asked to: 
 Note the outcome of this consideration of the preliminary requirements;
 Agree that Officers now formulate a draft closure proposal that will come
back to the December 2023 meeting of the Committee for consideration by
Members. If approved it would subsequently trigger a statutory consultation
process under the Schools (Consultation) (Scotland) Act 2010.
APPENDICES 
 Appendix 1 – LDP2 for Kilchrenan
 Appendix 2 – LDP2 for Taynuilt
 Appendix 3 – Key for Local Development Plans
 Appendix 4 – Floor Plan of Kilchrenan PS
 Appendix 5 – Floor Plan of Taynuilt PS
 Appendix 6 – Record of views expressed at Community Engagement Event,
Kilchrenan Village Hall, 31st May 2023

Page 39

Appendix 1 – LDP2 for Kilchrenan

Page 40

Appendix 2 - LDP2 for Taynuilt

Page 41

Appendix 3 – key for Local Development Plans

Page 42

Appendix 4 – Floor Plan of Kilchrenan PS 
Appendix 5 – Floor Plan of Taynuilt PS

Page 43

Appendix 6 – Record of views expressed at Community Engagement Event,
Kilchrenan Village Hall, 31st May 2023

Page 44

What has been the effect of the mothballing of Kilchrenan PS on the local
community?
 “None – some may say having a local primary school attracts young families
to the area, but as there is no affordable or social housing available, this is not
relevant.”
 “It is less likely that families will move to the area.”
 “Quieter without children in the playground.”
 “The Community Village Hall has lost revenue as the council no longer hires it
for PE lessons”
 “Children and parents are necessarily spending more time as part of a
different community.”
 “Very little change for a lot of us to be honest.” 
Option 1 – Continue with Mothballing of Kilchrenan PS
 Wider range of professionals moving to area due to improvement in
connectivity.  There may be more children in the community in the future.
 Continue with mothballing until viability improves
 Having a school in the area may support the creation of more
social/affordable housing in the area, as families are more likely to move to
the community.
 Continuing mothballing would be the worst of both worlds – better to make a
firm decision. (several attendees were of this view) 
Option 2 – Reopen Kilchrenan PS with the current catchment area
 The area is less attractive to families without a school – it is the hub of the
community
 There are concerns about transport for pupils from Dalavich travelling to
alternative schools further away.
 Kilchrenan could reopen within a hybrid model – links to other schools to
deliver aspects of the curriculum virtually.
 We would like our child to attend the local school here in the village of
Kilchrenan
 We would prefer to send our child to Taynuilt – better opportunities and a
wider social circle
 If Kilchrenan doesn’t reopen, the community is at risk as there will be nothing
to attract young families.
 45 minutes to an hour on a bus to get to further away alternative schools is
too much for young primary pupils.
 The school could reopen for children in ELC and P1-P4 only
 Reopening the school is a lovely thought, but it feels unrealistic and
economically unlikely 
Option 3 – Reopen Kilchrenan PS with a widened catchment area

Page 45

 Extending the catchment area would lead to increased transport costs and
longer bus times for pupils within the catchment
 Greater distance within the catchment area would increase the risk of pupils
not making it to school because of travel problems or weather.
 Extending the catchment would take pupils away from other primary schools,
which are also small 
 It is impractical due to the geography of the area. 
Option 4 - Close Kilchrenan PS permanently 
 At Kilchrenan PS, children don’t get the same opportunities as in other
schools.
 Kilchrenan PS pupils don’t get the PE choices of pupils in other schools.
 The building is dilapidated - fabric of the building is a concern.
 The answer from the previous HT to every complaint or suggestion was that
there is insufficient funding.
 KiIchrenan PS has no suitable play areas – play areas deemed “unsafe”.
 Closing the school is a no-brainer.
 In Kilchrenan PS, the standard of teaching for children was not good – wide
composite classes meant pupils weren’t getting individual attention.
 The travel options to Taynuilt and St Columba’s are not a problem – journey
times are comparable from Dalavich to Kilchrenan and Dalavich to St
Columba’s in Oban because of the detours on the route to Kilchrenan.
 There is no wrap-around childcare in Kilchrenan, and an absence of
registered childminders.  Regardless of whether Kilchrenan is open, parents
working is difficult.
 There are no cooking facilities in Kilchrenan – meals have to be brought from
Taynuilt which is not a cost effective or efficient way of doing things and
restricts what children can have.
 No breakfast Club at Kilchrenan which affects flexibility for families.
 Children who were attending Kilchrenan were having to go to Oban and
Taynuilt anyway for after-school activities.
 By attending a larger, better-resourced school rather than Kilchrenan, children
are benefitting greatly socially, and have wider opportunities. “They can be
who they want to be, can choose who they are friends with”
 Kilchrenan is not accessible as a building, eg. for those with disability
 If Kilchrenan was closed, the cost of keeping it open could be redirected
towards enhanced transport for pupils
 Closing Kilchrenan would be our choice, as we would rather send our child to
Taynuilt.
 We are very satisfied with provision in Taynuilt PS and would not move our
children to a reopened Kilchrenan PS
 If Kilchrenan reopens, pressure may be brought to bear on those families who
choose and alternative – community pressure to attend the village school

Page 46

 (From pupil) We could turn Kilchrenan school into a play areas – football
goals, rugby posts
 (From pupil) We could turn the grass into a football pitch