Page 1

1
Appendix1: CCF Delivery Plan 2024/25 – Mid-year Progress
1. Our Communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
Number of adults and young
people participating in
engagement activity through
Community Development
activity
205 150 New Pi for
24/25 166 150
Performance exceeded target.
Engagement activity included;
Community Surgeries,
Community Transport
engagement and summer
activities.
Elaine Troup
Action Status Progress Due Date Note Owner
Support community planning partners to develop and
deliver two CP events to support increased
participation
31-Mar-2025
Action progressing as planned, the first community event on child
poverty was undertaken earlier this year with community
partners. Discussion to define the focus of a second event will take
place at CPWD's November 24 meeting.
Elaine Troup
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Engaging positively with
Residents, Communities &
Partnerships
The risk that the Council fails to
adequately engage, establish and
maintain positive relationships with local
residents and communities in addition to
partnership bodies.
02-Aug-2024
This risk level remains unchanged. The
work to engage with residents,
communities and partners is on-going and
continues to be a key focus for the
Communities Team. Work continues to
build on our partnership working to deliver
effective Youth Learning and Community
Development services.
Elaine Troup

Page 2

2
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
No change to risk matrix.
Objective 2. Our residents health and wellbeing remains a priority
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
% of pupil medical dietary
requests met 100% 100% 100% 100% Target met. Sharon Jump
% of pupils who take up free
school meals ( P1-7 ) 86% 75% 75% 75% Target met. Sharon Jump
Action Status Progress Due Date Note Owner
Increase the number of locations offering access to
free period products 31-Mar-2025
Action progressing as planned.  Additional locations in community
owned premises have been identified, promotion will continue
within communities to ensure availability of products in areas of
most need. Going forward Facilities Management will ensure
stocks are maintained in community locations.
Elaine Troup
Review the outputs from Good Food Nation
Consultation process. 31-Mar-2025
Action progressing as planned. The Good Food Nation
requirements will apply across a number of services in the
Council. Further detail awaited from Scottish Government
following completion of review of full consultation responses.
Sharon Jump
Objective 3. Our residents are supported to increase life and learning skills

Page 3

3
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
Total number of library
issues (Physical and e-
Issues)
63,353 52,500 67,312 52,500
Target exceeded. Strong Q1
performance with total issues
comparable with Q1 2023/24
and an increase of over 9,800
compared with Q4 2023/24.
Further increase in visits in Q2. 
Emma Eremin
Total number of library visits
(physical and virtual) 113,684 90,000 72,149 60,000
Performance continues to exceed
target. Q1 data showing increase
of total visitor numbers from Q1
previous year and increase of
5,811 from Q4 2023/24.  Q2
data available from mid-October.
Emma Eremin
% Residents satisfied with
Libraries 81% 90% 83% 90%
Target marginally missed,
announcements to changes in
library services has impacted on
satisfaction. 
Emma Eremin
Total number of visits to
museums and heritage
centres  (virtual & in person)
29,391 26,628 30,750 26,628
Performance exceeded target in
both quarters. We are continuing
to see an increase in visitor
numbers.
Trish Robins
% Satisfaction with
museums & galleries 88% 88% 71% 88%
Q1 target met. Q2 significantly
missed target. Further analysis
to identify areas of improvement
are underway.  Progress of
Glencairn, Clydebank Heritage
hub and conversion of
Dumbarton library should
support improved satisfaction.
Trish Robins
Action Status Progress Due Date Note Owner
Progress funding application to support heritage
activity programme for Glencairn House  including
supporting the progress of the opening)
31-Mar-2025
Action progressing. Support is being provided as required to
progress the opening of Glencairn house. The design approach has
been agreed. The suite of signage is in development. Exhibition
design and content for the museum spaces is complete.
Trish Robins
Progress storage review and planning for future decant
of WDC collections to Strathleven 31-Mar-2025 Action progressing as planned. Market and supplier research
completed. Draft quotations gained to plan for the decant from Trish Robins

Page 4

4
Action Status Progress Due Date Note Owner
Poplar Rd to Strathleven Place in 2025. Progressing planning of
timescales and associated costs. The next stage will be to obtain
quotations from specialist museum removal and storage
companies.
Support progress of plan for opening of Clydebank
Heritage Hub 31-Mar-2025
Action progressing as planned.  Return of Local History & Archive
collections back to Clydebank has been completed. The enabling
works are currently underway and progressing well. The next
stage will be the museum fit out on site.
Funding application has been submitted to Museums Galleries
Scotland for a museums development grant to support
programme activity in the arts and heritage activity on site on the
opening of the new space.
Trish Robins
Support progress of new collections management
software.( MODES) 31-Mar-2025
Action progressing as planned.  The transition of data and
information to the new collections management system (MODES)
is underway and expected to be completed by the end of October.
The next phase will be training for the team in the use of MODES,
followed by work to progress the front end build of the platform
for public use and access. 
Trish Robins
Continue to delivery youth learning and community
based learning and participation opportunities. 31-Mar-2025
Action is progressing as planned. Draft year 1 Actions have been
identified and these will be discussed further with partners at The
Youth Alliance and Community Development Alliance (Empowered
DIG).  Ownership and reporting on actions will be shared across
the partnerships, going forward.
Elaine Troup
Implement and embed a new delivery model for co-
located libraries 31-Mar-2025
Action progressing as planned.  Dalmuir has co-located to Dalmuir
CE Centre, Balloch Library has been co-located to Balloch Campus.
Parkhall Library is due to relocate to Clydebank High School by
end October 2024. Co-located branches will be embedded into the
library network and staffing model is in place.
Emma Eremin
Create a strategy document for West Dunbartonshire
Libraries 31-Mar-2025
Action progressing as planned. Service plan for 2024-25 has been
linked to relevant frameworks and strategies.  Other library
authority strategies have been reviewed for reference. Outline
strategy will be progressed by the end of 2024.
Emma Eremin
Migrate the Libraries Management System (LMS) to a
new software supplier 31-Mar-2025
Action progressing as planned. Procurement of the new Library
Management System has completed.  All data has been migrated
and mapped from the old to new system.  All staff will receive
training on the new system in October/November.  A test system
is in operation until go-live in November when the contract with
the previous LMS supplier terminates. 
Emma Eremin

Page 5

5
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Status Progress Due Date Note Owner
Workforce Planning: Develop and implement wellbeing,
employee engagement, equality and learning and
development plans to enable capabilities, improve
resilience and promotion of a diverse workforce
31-Mar-2025
Action progressing as planned. Of the workforce planning sub
actions agreed within each service area, progress includes;
We continue to embed full team meetings across the contact
centre. Facilities management has undertaken a staff survey with
the responses being reviewed. A more consistent approach to
engagement Is being introduced including increased presence of
team leaders across the FM service. 
Amanda
Graham
Workforce Planning: Develop and implement employee
life cycle plans in line with the People First Strategy to
attract and retain the workforce.
31-Mar-2025
Action progressing as planned. Of the workforce planning sub
actions agreed within each service area, progress includes;
Working groups in place to consider progress of next phase of
Facilities Management service review with a view to improving
recruitment and retention.
Amanda
Graham
Workforce Planning: Implement service review process
including role design, use of new technology and new
ways of working to add resilience, address gaps, and
establish opportunities for efficiencies
31-Mar-2025
Action progressing as planned. Of the workforce planning sub
actions agreed within each service area, progress includes;
Staff engagement has been undertaken on the colocation of
libraries. Employee impact has been minimised by retaining level
of staffing in each affected branch and working collaboratively on
any issues. A Library Strategy is in progress any workforce
implications have so far been identified from the service plan 2024
-25.  Health Literacy training has been identified as required and
will be delivered by NHS Public Health in 2025.  Digital skills also
require some upskilling to widen digital access offer in all libraries.
Work has started within Facilities Management on developing a
suitable operating model for Faifley Campus.
Amanda
Graham
Workforce Planning: Develop and implement learning
and development opportunities to improve capabilities
and resilience within the workforce.
31-Mar-2025
Action progressing as planned. Of the workforce planning sub
actions agreed within each service area, progress includes;
Upskilling and new processes are being progressed to support the
introduction of a new customer hub system for customer services.
Following additional training, HR practices and policies are
embedded across the Facilities Management service and training
sessions including on stock control have been completed.
Amanda
Graham

Page 6

6
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
Percentage of complaints
received by the Council that
are resolved/ closed at Stage
1
78% 90% 90%
Q1 target marginally missed.
Overall 178 complaints were
received in Q1. Of these 155
were handled at Stage 1 which
represents an increase of 10%
on Q4 2023/24.  In Q1 139 stage
1 complaints were closed or
resolved at this stage. The
remaining 21 open complaints
will be closed and reported
within the appropriate quarter.
Increased workload and
complexity has meant more
complaints being escalated from
Stage 1. Q2 data available in
November.
Stephen Daly
Percentage of complaints
received by the Council that
are resolved at Stage 2
7% 10% 10%
Q1 target met. Overall 178
complaints received in Q1. Of
these 23 were handled at Stage
2. Of the stage 2 complaints
received 13 were resolved in Q1.
The remaining 10 open
complaints will be closed and
reported within the appropriate
quarter.  Q2 data available in
November.
Stephen Daly
% of telephone calls
answered within 5 minutes
by Repairs Contact Centre as
a proportion of all calls
answered.
93% 90% 76% 90%
Q1 target met. Over 10,682 calls
were received with 9,915 being
answered within 5 minutes and a
further 595 answered after 5
minutes.  Q2 target significantly
missed. Over 9,560 calls were
received with 7,280 answered
Stephen Daly

Page 7

7
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
within 5 minutes and a further
1,692 answered after 5 minutes.
An increase in number of calls
for updates to repairs has
increased the call handle time. 
We will continue to work with
Building Services to improve
performance.
% of telephone calls
answered within 3 minutes
by Contact Centre as a
proportion of all calls
answered.
88% 90% 74% 90%
Q1 target marginally missed.  
More than 6,510 calls received
with 5,741 calls answered within
3 minutes. A further 659 were
answered after 3 minutes. Q2
target significantly missed. More
than 8,017 calls received with
5,902 answered within 3
minutes.  A further 1,789 were
answered after 3 minutes. 
Reduced resourcing and
introduction of Garden Waste
Permit contributed to reduced
performance. 
Stephen Daly
Residents satisfaction with
Council services overall 67% 85% 71% 85%
Target significantly missed for
both quarters, with marginal
improvement in Q2. Recent
changes across a number of
Council services due to budget
reductions have impacted on the
satisfaction rate.
Amanda
Graham
Action Status Progress Due Date Note Owner
Implement complaints management process
enhancements – next phase 31-Mar-2025
Action progressing as planned. Testing of the new complaints
management system which has been developed by the web team
is completed. System now live and will be monitored until fully
embedded.  
Stephen Daly
Explore telephony self-serve options 31-Mar-2025 Action progressing as planned. Discussed with ICT aspirations for
call waiting technology and voice recording. Consideration will be Stephen Daly

Page 8

8
Action Status Progress Due Date Note Owner
given as to how this could integrate with the current telephony
infrastructure.
Roll out child friendly complaint procedure. 31-Mar-2025
Action progressing as planned. We have implemented the best
practice guidance which Councils have been provided with by the
Scottish Public Service Ombudsman (SPSO). This has been
integrated into our guidance and our system have been updated
to account for this new procedure.
Stephen Daly
Progress Community Facilities Plan 31-Mar-2025
Action progressing as planned. Only one of the identified
community facilities remains outstanding and discussions are
underway with a community organisation.
Amanda
Graham
Progress commercialisation and income generation
opportunities 31-Mar-2025
Action progressing. Work continues with assets taking lead on
commercial lease of properties and expressions of interest
received. A billboard site has also been successfully marketed.
Work has been impacted by reduced capacity as a result of
absence.
Amanda
Graham
Review and redesign of the Communities team service
delivery 31-Mar-2025 Action progress has been impacted due to reduced capacity within
the team. Elaine Troup
Review operating model of Facilities Management
service – Next Phase 31-Mar-2025
Action progressing as planned. Staff survey undertaken, with just
below 30% response rate, feedback being reviewed to develop
improvement actions as required. Back to work sessions
undertaken across all teams and well attended. 
Sharon Jump
Review menu and food purchase to minimise waste
and reduce costs 31-Mar-2025
Action progressing as planned. New three weekly menu in place.
Review of products and pricing complete. High schools are all
purchasing the same products and costing and pricing is aligned
and in line with procurement process. Both will support reduction
of wastage and costs.
Sharon Jump
Review library materials and staffing 31-Mar-2025
Action progressing as planned. Library materials have been
reviewed and we will continue to evaluate usage of online and
physical materials.  A library stock policy has been drafted and the
book budget has been allocated.  
Emma Eremin

Page 9

9
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Risk of Failure to meet
citizen expectation and
service standards
Risk of citizen dissatisfaction due to us
not doing what we say we will when we
say we will.
03-Oct-2024
There are a number of actions and
strategies in place to monitor service
standards and customer satisfaction in
partnership with services across the
Council.
No change to risk matrix.
Stephen Daly
Failure to effectively manage
and learn from complaints
There is a risk of damage to the
Council's reputation. If complaints are
not handled effectively, there can be an
adverse effect on the public perception
of the Council which can lead to a lack of
trust in the services provided.
03-Oct-2024
Work continues to engage with services
and improve response times and learning
outcomes. Action plan agreed with
Internal audit to address challenges with
the compliance of complaint management
is complete.
No change to risk matrix.
Stephen Daly
Objective 12. Our residents are engaged and empowered
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
% of stage 1 complaints
responded to within 5
working days.
58% 100% 100%
Q1 target significantly missed. 
Overall 139 complaints were
handled at stage 1. Of these 80
were responded within 5 working
days. Delays were due to
increased workload and delays in
responses from services. Q2 data
available late October.
Stephen Daly
% of stage 2 complaints
responded to within 20
working days.
31% 100% 100%
Q1 target significantly missed. 
Overall 13 complaints were
handled at Stage 2. Of these 4
were responded to within 20
working days. Delays in
responses are due to the
complexity of matters raised and
also delays in responses being
Stephen Daly

Page 10

10
Q1 2024/25 Q2 2024/25
Performance Indicator
Status Value Target Short
Trend
Long
Trend Status Value Target Short
Trend
Long
Trend
Notes Owner
received from services. Q2 data
available in November.
No. of transactions
undertaken online 14,961 15,500 20,442 15,000
Q1 target marginally missed with
increase in Q2 performance
which exceeded target.
Stephen Daly
Percentage of residents who
are satisfied with the Council
website
79% 85% 88% 85%
Q1 target marginally missed,
with improvement in Q2 which
exceeded target. 
Stephen Daly
% of residents who feel the
Council communicates well
with them
59% 75% 46% 75%
Target significantly missed for
Q1 & Q2 with performance
continuing on a downward trend.
This feedback reflects on how
well individual services
communicate and interact with
residents when they make
contact. Proactive
communication continues to be a
key priority with a range of
channels utilised to keep
residents informed of the work of
the Council, policy changes and
information about the area. As
well as digital measures like
social media and the Council
website, the Council uses print
media, quarterly Housing News
editions and printed marketing
materials where appropriate to
ensure the widest range of
residents can access information
easily
Lauren Crooks
Action Status Progress Due Date Note Owner
Progress upgrade online content management system
– next phase 31-Mar-2025
Action progressing as planned. Contract in place, preparatory
work started for the external site, next steps will include work on
the internal site.  Upgrades are scheduled to start in Q3 of this
financial year. 
Stephen Daly

Page 11

11
Action Status Progress Due Date Note Owner
Progress security reviews of websites 31-Mar-2025
Action progressing as planned. All immediate fixes required to the
website have been installed. We have also completed additional
high and medium level security fixes recommended by 3rd party
developers and from security reviews.
Stephen Daly
Review accessibility of the website and intranet. 31-Mar-2025
Action progressing as planned. Progress is being made on the
websites; internet and intranet accessibility issues. This is
continually monitored as regulations change and editors add
content. The internet review is complete and we are about to start
looking to improve the intranet site now. Further review will be
done when the new regulations come out in October 2024.
Stephen Daly
Develop Strategic Communications Strategy 31-Mar-2025 Action progressing as planned. Final draft of the Strategy is
complete and will be issued by end of calendar year. Lauren Crooks
Develop a communication plan to support budget
savings initiatives 31-Mar-2025
Action progressing as planned. Plan prepared, communication will
take place in November/December and throughout January -
March.
Lauren Crooks
Deliver the UK Shared Prosperity Funded projects 31-Mar-2025
Action progressing as planned.  Community partners are
progressing projects in their local area. Work on end of project
evaluation and reporting will begin in January 25.
Elaine Troup
Develop an approach for the future provision of
community budgeting 31-Mar-2025
Action progressing as planned.  Community Budgeting will launch
in October 24 with the theme of community based food provision.
The available budget will be augmented by UK Shared Prosperity
Fund (UKSPF). 
Elaine Troup
Continue to Develop an approach to food insecurity 31-Mar-2025
The action is progressing as planned. Uptake of the available
funding has been slow.  Changes have been made to the approach
and additional promotion work is underway.
Elaine Troup
Progress plans to strengthen approach to strategic
engagement 31-Mar-2025
Action progressing as planned. To further strengthen our approach
to strategic engagement, the 2025/26 Budget Conversation
engaged with community organisations representing a wide range
of the community. We have also reviewed participation across a
range of engagement events to identify under-represented groups
and taken steps to increase participation from these groups so
engagement is as representative as possible and all communities
feel valued. We also plan to pilot a young person’s citizens panel
and increase our engagement opportunities with BSL users
Nicola
Docherty
Reflect legislative changes from Scottish Gov in WDC
equalities framework, process and procedures 31-Mar-2025
Action progressing as planned and expected to be completed by
year end. The Equality and Diversity Working Group has been
updated on revisions to the Public Sector Equality Duty. We await
further guidance from the Scottish Government on confirmed
content; this has been delayed and anticipated around November
2024. Preparatory work for the Equality Outcome Monitoring and
Nicola
Docherty

Page 12

12
Action Status Progress Due Date Note Owner
mainstreaming report 2025-29 is underway identifying key
considerations for West Dunbartonshire. 
Develop WDC British Sign Language plan 2024-30 31-Mar-2025
Action progressing as planned and anticipated to be completed by
year end. In conjunction with BSL users, the statutory BSL plan
2024-30 identifying key outcome areas for West Dunbartonshire
has been developed and published in English and BSL. A BSL
action plan will guide this and be updated on a yearly basis. In the
second half of the year we will work to progress these actions to
improve outcomes for BSL users and continue engagement work
with BSL users. 
Nicola
Docherty
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Failure to secure community
and partner buy-in for the
emerging Community
Empowerment Strategy and
Action Plan.
In order to deliver on the ambitions of
the Community Empowerment Strategy
and associated action plan, it is vital that
a partnership approach is promoted to
ensure best use of resources, skills and
expertise.
25-Sep-2024
The community empowerment agenda is
being progressed.  We are working with
CPWD Management Board to increase
opportunities for communities to
participate in community planning events.
This work will run in parallel with the
wider community development approach
to build individual and community
resilience and participation.
No change to risk matrix.
Elaine Troup
Failure to deliver on the
capacity building of the
Community Empowerment
(Scotland) Act
There is an ever greater need to support
and develop communities. Community
capacity building and community
development work continues within
existing resources.
25-Sep-2024
Delivering the Council's community
empowerment agenda remains a priority.
Delivery of community capacity building /
community development work continues
and benefits from external funding to
deliver specific projects.
No change to risk matrix.
Elaine Troup
Risk of Ineffective
Communications /
Reputation Risk
Ineffective use of corporate
communication channels may result in
messages that are inconsistent with
authorised responsibilities or established
performance measures. Employees
without intranet access or email access
may not receive communications. Not
effectively managing corporate
responses to adverse events may lead to
an erosion of the Council's reputation.
13-Sep-2024
A number of processes and strategies are
in place to ensure internal and external
communication is effective and protects
the Council's reputation.
No change to risk matrix.
Lauren Crooks

Page 13

13
Action Status
Overdue
Not on track
In Progress and on track
Completed
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Risk Status
Alert
High risk
Warning
OK
Long Term Trends
Improving
No change
Declining
Short Term Trends
Improving
No change
Declining