WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Corporate Services Committee:  22nd May 2024
___________________________________________________________________
Subject: Council Workforce Plan 2022-2027:  Update & Annual Action
Plans 2023/24
1. Purpose
1.1 The purpose of this report is to provide an update on the Council’s workforce
planning activity for 2023/24.
2. Recommendations
2.1 The Committee is asked to:
• Note progress during 2023/24 in delivering against the Council Workforce
Plan within the People First Strategy and 5-year plan;
• Note the workforce profile as at 31st March 2024 and key changes; and
• Note progress within the Workforce Plans for each service.
3. Background
3.1 The Workforce Planning Strategy and Framework 2022 - 2027 reflects the 5-
year People First Strategy and incorporates the Council’s Strategic Planning
Framework.
3.2 The Council Workforce Plan is subject to monitoring and evaluation to ensure
that it remains effective in delivering required outcomes and is responsive to
any changes in circumstances, which subsequently arise. This report contains
2 sections and associated appendices:
• The progress and achievements made over the last year (Appendix 1);
• The current workforce profile and monitoring, examining any changes
(Appendix 2).
3.3 Service annual action plans are scoped under the four Workforce Planning
Priorities from the Corporate Workforce Plan outlined at 4.1 for each Chief
Officer Area and are submitted to the relevant Committee as part of the
Delivery Planning process. Separate delivery reports are tabled at this
committee. 
3.4 Whilst separate planning processes exist in relation to West Dunbartonshire
Health & Social Care Partnership (HSCP), appropriate alignment is in place
including attendance at the Health Care Staffing and Workforce Planning
Oversight Group to ensure that Council employees working within HSCP are
ITEM 12

Page 2

included and benefit from all Council Wide initiatives and relevant workforce
planning requirements. 
4. Main Issues 
4.1 The attached (Appendix 1) updates on the annual action plans at Chief Officer
Service level for 2023/24 under the 4 Priorities:
Priority 1. Our People (Workforce Profile): Ensure resilience and
engagement of the workforce;
Priority 2. Recruitment & Retention: Current and predicted future
workforce gaps are addressed and core skill sets retained;
Priority 3. Structure & Roles: Service structures and delivery model/s
are stable, fit for purpose and future requirements;
Priority 4. Skills & Capabilities: Current and future skills gaps and
capabilities are addressed.
These 4 priorities are formed from the Corporate Workforce plan which
reflects the People First Strategic Plan. 
4.2 Key Achievements 
4.2.1 Key achievements over 2023/24 for workforce planning within the context of
the People First Strategy are outlined in the sections below. 
4.3 Workforce Planning Strategy & Framework 
4.3.1 During 2023/24, efforts were concentrated around further supporting the
embedding of workforce planning.  The Council’s Best Value Audit noted the
practice in relation to work force planning including our overarching People
First Strategy, individual service workforce plans and the real time data
available on the workforce planning console. 
4.3.2 Following a manager’s survey, to gain feedback and benchmark knowledge
on workforce planning, a workforce planning toolkit was developed to support
managers and close the identified knowledge gaps, improve understanding,
inform future development of content and supports required. It is expected this
toolkit will be added to, in order to continue to support managers. 
4.3.3 Survey results in relation to the workforce planning console and the provision
of real time data across the Council have informed future developments for
the console and these are outlined within this report. 
4.3.4 To support the launch of the WFP Strategy & toolkit, information sessions
were held, for managers, these were well attended and feedback positive with
ideas to inform future developments. The sessions were timed to be ahead of
the end of year updates and creation of 2024/25 workforce plans to ensure
managers are appropriately skilled and supported to undertake workforce
planning.

Page 3

4.3.5 Embedding the Strategy and Framework has seen the continuation of Chief
Officer and Manager Information packs being issued at key stages with
discussions taking place in management meetings to support workforce
planning activity and reporting requirements at Service level. 
4.3.6 This year has seen further engagement in external groups to ensure the
Council has input to national and local strategies and can benefit from
initiatives and joint working. This has included a national survey completed by
all 32 Local Authorities in relation to workforce planning in October 23 through
the Society of Personnel and Development Scotland (SPDS) and involvement
with Glasgow City Region Skills Local Government Skills Working Group
where career pathways are currently being developed. Outcomes from these
will be shared with Chief Officers to inform future direction and progress. 
4.4  Priority 1. Our People (Workforce Profile): Ensure resilience and
engagement of the workforce. 
Equalities 
4.4.1 Progress of the Council’s equality action plan has continued to reflect the
People First Strategy and employee life cycle concentrating on recruitment
including methods, in the first instance, to increase the diversity of our
workforce. 
4.4.2 Recognising the importance of diversity and inclusion, and a workforce which
is reflective of our communities, focus has continued to be given to actions to
support this, supported by a recruitment audit and equal pay audit both
completed this year. The findings of these have further informed strategic
actions and recommendations for improvements. 
4.4.3 It is recognised that the Black and Minority ethnic (BME) workforce profile is
an area for improvement for the Council’ as we look to ‘attract more diverse
talent’. The Council has recently signed the Race at Work Charter to make a
public commitment to improving equality of opportunity in the workplace. 
There are several actions including Executive Sponsorship with the Council
having Joint Sponsorship from our Chief Officer, People & Technology and 2
Elected members. The action plan and launch of this Charter will be carried
out in early 2024/25. 
4.4.4 Understanding the makeup of the workforce is imperative to understand future
workforce needs however gathering the necessary employee data
surrounding equalities, remains a challenge. Although data verification
exercises have been carried out these have only seen slight improvements
and the exercises have not provided an adequate response for meaningful
analysis in some areas.  A further data verification exercise is therefore
planned for 2024/25 highlighting response rates and gaps coupled with clear
engagement as to why this data is important, what it is used for, to provide
reassurance and confidence.

Page 4

4.4.5 Focus has been given this year to progressing and achieving the Equally Safe
at Work (ESAW) programme Development Tier. ESAW is an innovative
employer accreditation programme to address sex inequality and violence
against women and girls, aiming to support employers in reviewing workplace
culture and ensuring that policies and practices are enhanced to address the
barriers that women face at work. The accreditation brought key actions into
place to address the issues faced by women which included the introduction
of a Gender Based Violence Policy, the review of the Organisational Change
Policy with a Gender based lens and the launch of 2 e-learning modules
‘Together for gender equality’ and ‘Gender Based Violence’ which will be
mandatory for all. 
4.4.6 The Council has held the Armed Forces Gold Award for actions in support of
Armed Forces, reservists and their family members since 2019.  Work has
continued to support the maintaining of this award, with re-assessment
scheduled later this year including an Armed Forces support Group,
consideration to how support can be extended to Cadets and reviewing the
activity which services are undertaking in support of the award for further
improvements and joint working opportunities. 
4.4.7 The Council continues to consider its terms and condition considering the
recent Equality Review.  Consultation continues and work is currently
underway to understand the workforce position on public holiday entitlements
through an employee survey. 
4.4.8 The Council is committed to fulfilling the elements of the public sector equality
duty as defined in the Equality Act 2010 and undertook an Equal Pay Audit
this year. The outcome of this audit provided the following recommendations: 
• Continue to promote the annual data verification exercise with the
Trade Unions. 
• Continue to promote the Council’s commitment to ‘make TIME for
disability’ through the Employee Wellbeing Group. 
• Undertake a recruitment and selection audit to identify any barriers
impacting on disabled people entering employment with or progressing
within the Council, females accessing full-time employment and
females undertaking traditionally male gendered roles.  
• Continue to scrutinise the use of multi-posts in the organisation.    
• Promotion of flexible working in traditionally male gendered roles.   
Wellbeing 
4.4.9 The priority relating to Wellbeing activity in 2023/24 was to complete the
launch of the new employee benefits platform Vivup.  This launch
strengthened the wellbeing supports available to employees through the
provision of additional employee counselling, self-help resources, sign posting
to financial wellbeing supports in addition to a range of supports to aide
physical wellbeing, victims of domestic abuse, advise on energy bills etc.

Page 5

Vivup has been promoted through all communication channels including
mental health first aiders and wellbeing advocates, Trickle, workforce updates
and the intranet newsfeed.  The regular wellbeing round up has also been
spotlighting specific supports for employees each month to raise awareness
of the content contained within the platform.  Employees can access it using
an app or website and posters were shared with establishments who have
front line employees that don’t often work at a computer to help to ensure that
as many employees as possible are aware of the support available. 
4.4.10 The platform was launched alongside AVC Wise, a new platform that supports
employee’s financial wellbeing through additional voluntary contributions to
the pension scheme.  Whilst AVC’s were already available to employees,
AVC Wise have enhanced this offering with a range of educational resources
available to employees to help them better understand how to get the most
out of their pension and plan for a better retirement.  There is now a rolling
schedule of financial wellbeing webinars and 121s available to employees to
help them maximise this element of their financial wellbeing.    
4.4.11 It had been hoped that improvements would also be made to the stress risk
assessment form in 2023/24 but resource restrictions within the Strategic HR
team have meant that this work has not been able to be progressed and will
be carried over into 2024/25 and captured as part of a wider piece of work
that is ongoing to digitise the delivery of HR services.  In addition to the
above, work commenced on the re-tender of the Occupational Health,
employee counselling and physio contracts.   
Employee Engagement
4.4.12 Research has shown where a workforce is highly engaged it tends to be
more productive, with reduced absence and employee turnover.  Through
the ‘People First’ Strategy, the Council has committed to developing and
improving employee engagement by building on existing good practice.
The Council already has a number of initiatives to support employee
engagement including Trickle, 1-2-1 (Be the Best) conversations to support
workforce development, recognising success and value through employee
recognition awards and understanding the workforce voice through Trickle
Moodsense. 
4.4.13 The Council’s main tool for employee engagement is a digital platform
called Trickle, available via the website or App which enables inclusivity as
it is accessible to the whole workforce. This enables the workforce,
including front line employees, to raise issues and access information via
the App on their phone.  Recognising the benefits of this employee
engagement tool, our aim is to improve the level of engagement with
Trickle across existing and new users and the number of users is currently
1974, which is an increase from 1316 from September 2022. 
4.4.14 Demonstrating that the Council values employees and celebrates success
is an essential component of employee engagement.  There are many

Page 6

activities currently underway to support this, including a redesign
Recognition Awards, aligning these to our core ACHIEVE values and will
be launched in 2024.  The revised categories are detailed below: 
Award Category  Description
Trailblazer Award  Celebrates individuals who exhibit exceptional ambition and
visionary thinking, pioneering new directions in their work
and inspiring others to pursue excellence. 
Doing the Right Thing
Award 
Celebrates ethical conduct, integrity, and a commitment to
doing what's morally right
Innovative Solutions Award Recognises individuals who demonstrate a remarkable
ability to think creatively and develop innovative solutions to
complex challenges, contributing to more efficient and
effective processes. 
Teamwork Excellence
Award 
Celebrates outstanding collaboration and the promotion of a
unified and effective team environment. 
Empowerment Champion
Award 
Celebrates the proactive empowerment of others and
support for their growth and development. 
Community Appreciation
Award 
Celebrates community recognition and appreciation for
exceptional service and contributions. 
Work Styles/Flexibility 
4.4.15 Monitoring working environments continues as employees are supported to
work more flexibly, from various locations, whilst balancing their service
delivery, digital security and personal commitments. Ensuring work styles and
patterns are considered as part of organisational transformation, service re-
design and flexible working continues and has been imperative to workforce
planning for services. This is essential not only in supporting employee’s
wellbeing but key to improving productivity, recruitment and retention.   
Policy 
4.4.16 The Council’s employee policy base has seen the launch of the Violence
against Women Policy in support of the Equally Safe at Work Programme and
the review of the Organisational Change Policy through a gender lens which

Page 7

saw changes being implemented to the policy providing further supports and
considerations to women and other minority groups. 
4.4.17 The need to make budget savings during 2023/24 saw the implementation of
a Redundancy Procedure and Guidance in August 2023. The launch of this
policy was accompanied by management information sessions to support
implementation of the policy, budget savings and workforce planning
considerations, these were well attended and received. 
4.4.18 Due to an increased workload, there was a need to review resources within
the Strategic HR team and introduce new practices in relation to the provision
of HR support and advice to ensure key priorities, workstreams and projects
can be progressed in 2024/25. A number of policies were updated to reflect
these changes including the Supporting Employee Wellbeing and Disciplinary
Procedures. Due to other policy and legislative changes, best practice and
Council decisions a number of policies were amended to reflect these new
requirements including the Special Leave Schemes, Bereavement Leave,
Maternity Leave Scheme, Trade Union Learning Agreement, Domestic Abuse
Policy and Switch Policy. 
4.4.19 The Respect at Work Policy was completed along with a supporting toolkit
and was launched in early 2024 to ensure the prevention of bullying,
harassment, victimisation and discrimination are mitigated, supports received
and effective channels to resolve are present, for all employees, supporting
our equality agenda. 
4.4.20 Further progress has been made in relation to a Resolution Framework which
will simplify the policy base for employees and managers who raise concerns
with a focus on early intervention, informal (where appropriate) and effective
resolution of concerns. A survey was carried out to gain feedback in relation
to our policy base including the structure, language and ease of use. This was
followed up by a design workshop involving managers, employees and Trade
Unions to consider the make-up of policy frameworks for future consideration.
The drafting of a Resolution Framework will commence in 2024/25. 
4.4.21 The review of the job evaluation processes as outlined at section 4.5.4 led to  
the Job Evaluation Policy and Process being revised and re-launched with
training taking place for Strategic HR and Trade Unions in relation to job
evaluation and the role of job analysts to ensure consistency of this function. 
4.4.22 Although delayed due to demand on resources, work continues around a
flexible/hybrid working policy to reflect the current workstyles and culture of
the Council. A further review of the policy timetable for the revision and
drafting of policies will continue ensuring our policies meet legislative
requirement and support our workforce needs.

Page 8

4.5 Priority 2. Recruitment & Retention: Current and predicted future workforce
gaps are addressed and core skill sets retained 
Year 1 People First – Employee Life Cycle - Recruitment 
4.5.1 The People First Strategy in relation to the employee life cycle commenced
with a focus on recruitment and work remains on-going.  The intention is to
create a positive inspiring, informative and seamless journey from application
to appointment, attract the right candidates, aid retention and in turn support
the workforce planning and equalities agenda. 
4.5.2 Following a full review of the process and findings being presented in ‘show
and tell’ session for the People and Change Teams, a number of work
streams were set up to progress this agenda including process and policy
review, talent management, job quality and workforce planning initiatives,
equalities actions and engagement to bring about improvements to the
recruitment process for services. Improvement workstreams are ongoing.   
4.5.3 A recruitment working group has been established incorporating the
requirements of the recruitment audit related actions to improve the
recruitment process and attracting diverse talent. Linking with the Corporate
Workforce plan this has included discussions with working 4U to provide
better connections to current and potential talent pools. 
Job Evaluation 
4.5.4. The new Job Evaluation Policy and Procedure was agreed by the Trade
Unions and Council in November 2023. Training has taken place for all
existing and new job analysts (Management, Trade Union and Strategic HR)
late in 2023 and early in 2024 to ensure a consistent application to all posts
within the Council. 
4.5.5 Further work has commenced to ensure all data relating to job evaluation is
robust and fit for purpose.  This essential work will lead to improved job
design and compliance with the Strategic Operating Model (SOM) and provide
structured governance moving forward to any proposed changes in line with
the Workforce Plan. 
Career Pathways & Succession Planning 
4.5.6 Recruitment and retention remain challenging for certain roles within the
Council, in particular Social Care and Social Work which follows national
trends. The development and mapping of career’s pathways has commenced
with the HSCP to outline the entry requirements for roles, routes into
employment and development opportunities/supports for future progression
through the career structure. It is expected that this template can be utilised
across the Council for other roles aiding the development of new talent pools
and routes into Council employment at the same time facilitating cross service
skilling and links into other career pathways.

Page 9

4.5.7 To support future retention and forecast workforce requirements the Council’s
Succession Planning Framework is in the process of being reviewed and
updated. This will be launched alongside manager information
sessions/workshops and form part of the Workforce Planning Toolkit. 
Apprentice Remuneration 
4.5.8 A new pay renumeration for apprentices' paper was approved at Council late
last year. This has seen a significant increase to the majority of apprentice’s
salaries regardless of age which goes beyond the national requirements. This
positive decision taken by Council will provide a positive destination for all
apprentices and provide sustainability for the delivery of future services 
4.6 Priority 3. Structure & Roles: Service structures and delivery model/s are
stable, fit for purpose and future requirements 
Budget Savings 
4.6.1 Following the announcement of budget savings, priority continues to be
directed to supporting services across the Council to make the relevant
savings. Whilst services have been continuing to embed the changes made
as part of the budget savings 2022/23, they have also reviewed their
workforce planning requirements and explored opportunities to deliver
services differently and more effectively whilst making proposals for savings
for 2024/25. 
4.6.2 Strategic HR continue to support services with the introduction of the
Redundancy Procedure and Guidelines, including a selection matrix, if
required.  Lessons learned around previous year’s savings processes have
led to improvements to the Voluntary Severance and Voluntary Early
Retirement processes, data links to Strathclyde Pension Fund ensuring
consistency, accuracy, improvements in SWITCH processes for redeployment
and the control of external recruitment. 
4.6.3 Whilst savings to date have led to a number of employees leaving the
workforce, on a voluntarily basis, through various means, the focus for
workforce planning has shifted to stabilising the workforce and work priorities.
With future budget gaps predicted, longer-term workforce planning remains
difficult. 
4.6.4 Affected services are currently entering a further formal consultation period,
the effective use of the workforce console and data continues to be imperative
to inform and fully understand the implications of proposals for service
delivery, the workforce and ensure accurate notification of the potential
impacts. Focus will continue around employee engagement supports with
promotion of our current support mechanisms and the introduction of PACE
(Partnerships Action for Continuing Employment) support the Scottish

Page 10

Government’s initiative dedicated to helping people with advice and support
when faced with the possibility of redundancy if required. 
SOM (Standard Operating Model) 
4.6.5  Work is under way to ensure that the spans of control and ratios of employees
to managers is correct and fit for purpose, to ensure service delivery moving
forward. This includes the SOM principles and a tier by tier approach
reviewing Chief Officers and Service Managers to ensure that we have
compliance and a consistent structure in place to deliver the services required
in the future. Governance arrangements are ensuring role profiles are
updated to reflect current responsibilities and duties. 
Fit for Future (FfF) Service reviews  
4.6.6  Seven services were reviewed as part of FfF with the last review completed in
December 2022.  No requests for new FfF reviews have been received this
year with services concentrating on budget savings and subsequent service
reviews and embedding changes. As services review the way they deliver
their services resources from the Digital Team have reviewed the FfF
approach and continue to support services with digital solutions, service re-
design processes, project support, training & development opportunities and
automation of process and forms. 
Information & Data 
4.6.7 Service level workforce Plans are embedded within Service Delivery plans
and work has continued to promote the use of monitoring these within the
Council’s performance management system ‘Pentana’. Awareness sessions
on this, alongside cross services views of workforce plans has enabled joint
working with visual progress reporting through management information
sessions and packs. Further analysis will be undertaken of service workforce
plans for 2024/25 through the platform to inform future supports and
opportunities of efficiency. 
4.6.8 The workforce planning console continues to be the key source of workforce
information for managers using real time data. Further developments have
taken place in relation to this console including the introduction of Voluntary
Early Retirement and Voluntary Severance application monitoring. 
4.6.9 The console has been developed to show spans of control in a more concise 
and dynamic way to support the Strategic Operating Model (SOM) principles 
for easier review of structures and anomalies to be rectified in addition to 
prompting recommendations for structure improvements. Further information 
of the SOM is outlined in section 4.6.5. 
4.6.10 It is recognised that further developments of the Workforce Planning Console 
are required and work has continued in relation to the scoping of possibilities

Page 11

and requirements around workforce projections, trends and the possibility of 
automation of workforce plans linked to data insights. 
4.6.11 Feedback from the survey and workforce planning sessions provided useful
insights in relation to the use and understanding of the console. Based on this
feedback, console information sessions specifically linked to workforce
planning are being developed and will be rolled out in 2024/25.   
4.6.12 Data and analytics continues to play a key role in considering future resource
requirements and supported the People & Change function, leading to a
review of the workload and support the team provides. 
4.6.13 Surveys, self-evaluation, service design and quality improvement exercises
and workshops continue to provide beneficial insight into areas for
enhancement and have informed associated action plans. 
4.6.14 The Local Government Associations workforce planning maturity matrix has
also been undertaken to understand further how developed our workforce
planning is at a Council level and provide insights into areas of development.
This will be considered over 2024/25 alongside other key data sources to
inform future actions and developments to further embed workforce planning.
4.7 Priority 4. Skills & Capabilities: Current and future skills gaps and
capabilities are addressed. 
Learning & Development 
4.7.1 A new 'learning basket' concept has been introduced which offers more
flexibility for employees to choose what development is required and when. 
There is a choice of flexible modular content and complete programmes so
everyone is in charge of their own development. 
4.7.2 This modular approach has been applied to:
• Be the Best at Managing People
• Peer Coaching Circle
• Future Leaders Toolkit
• Core Strengths: Results through Relationships
• Modern Leaders (a new programme with 6 flexible modules). 
4.7.3  The new Modern Leaders programme provides leaders with a year-round
programme of modules that they can select from.  Each module has 4 short
episodes on an aspect of modern leadership practice. 
4.7.4  Online learning via our iLearn platform has continued to go from strength to
strength with an overall increase of +825 modules completed as compared to
the previous year. The ILearn platform has been upgraded with additional

Page 12

functionality and improved layout and imaging.  New reporting options are
also being developed and will be made available through the year. 
4.7.5 During 2023/24 the Service Re-design training was reviewed, re-vamped and
rolled out with positive feedback. On-going support and coaching is made
available to support leaders with their re-design projects. 
4.7.6 Through the workforce planning survey and manager sessions a number of
supports for managers were identified in relation to workforce planning
including succession planning, career pathways, talent pool development and
workforce planning console data insights. Development opportunities and
support materials are currently being developed with the longer term vision of
building a toolkit and library of resources and training modules. 
Digital Transformation & Skills 
4.7.7 The Digital Transformation Board will be relaunched in April 24 as the People
First Innovation Board with a different digital theme each quarter:
• Theme 1 (Apr to Jun) – Putting People First: 
This will focus on DigiChamps, the development of digital skills and it            
will also emphasise the importance of service users.
• Theme 2 (Jul to Sep) – Turning Data into Diamonds:
This will focus on data and how we can use and develop it into useful
management information which supports decision making. 
• Theme 3 (Oct to Dec) – Maximising Technology through M365: 
This will focus on M365 SharePoint rollout and the subsequent
introduction of Microsoft business applications. 
4.7.8 The 2023 digital skills survey ran from October to November 2023.  It contained
a simplified question set with some questions from the 2019 survey kept for
comparison purposes. The survey focused on awareness, digit champs,
learning information and topics, skills ratings, barriers, opportunities to
improve and what support are required. It was promoted via newsfeed, emails
and Trickle. Digital Skills remains a priority for the Council and PMRG have
been asked to promote the DigiChamps(s) role within their service and
nominate DigiChamps(s) where none are in place. 
4.8 The current workforce profile 
4.8.1 The workforce profile as at 31/3/24 is attached in Appendix 2, with
comparisons made against the previous year and commentary on trends. 
The main observations are detailed below. 
4.8.2 There has been a 4% decrease in Headcount and working hours. When
compared to the same period last year, there has been a headcount reduction
of 172 across the council. This change is mainly accounted for by the
implementation of savings options and recruitment restrictions.

Page 13

This year has seen an increase in fixed term contracts and an increase of 7
apprenticeships this year, with the casual/supply pool headcount increasing.
Reviewing the comparison data the overall workforce has steadily declined
with the bulk of the reductions in Housing & Employability and Resources with
People & Technology (P&T) and Roads & Neighbourhood increasing, due to
the transfer of Business Support Staff to (P&T) re-distribution of Supply
Distribution and Property Services 
4.8.3 Whilst the percentage reductions have been across permanent contracts (3%)
fixed term contracts have increased by 4% indicating a correlation between
the figures. This is likely due to services implementing budget savings and
bridging gaps during this transition.  In addition the percentage of
apprenticeships has increased by 1% from last year indicating the continued
trend of workforce planning and development of future talent pools. 
4.8.4 The percentage split of full time and part time contracts has remained largely
unchanged with the same reflected in the overall sex profile with a static
overall split of 26.4% male and 73.6.% female. 
4.8.5 Whilst the age distribution has also remained fairly static, it can be noted that
there is a slight increase in the 16-19 age group indicating the increase in
Modern Apprenticeships and a reduction in those working past 65, particularly
in Education Services. 
4.8.6 Turnover has increased to 15% from 13.2% from last year with the highest
turnover remaining in Citizen, Culture and facilities. However other services
are indicating higher turnover such as People & Technology, Regulatory and
Regeneration. High turnover also remains in Education and Community
Health Care and is featured for Mental Health, Addition and Learning
Disabilities. Turnover has significantly increased from previous years as
predicted and can be attributed to the impact of budget savings, evidenced in
the sharp increase in Voluntary Severance and Voluntary Early Retirement
from 9 last year to 48 this year. This is also reflected in an increase in the
number of people taking early/flexible retirement from age 55. 
4.8.7 This year has seen a further reduction in the sickness absence figure from
14.00 full time equivalent work-days lost per employee to 13.74. Although the
same reasons of minor illness, personal stress and acute medical conditions
remain the highest with front line employees having the highest levels of
sickness. Employee wellbeing and engagement supports will continue to be
developed and deployed. 
4.9 Workforce Planning Actions for 2024/25 
4.9.1 The Corporate Workforce Plan for 2024/25 has been reviewed and updated.
Key areas for progression and continued development are outlined in the
sections below and build on many of the actions outlined for 2023/24. It is
noted however that many of these areas are interdependent contributing to
the People First Strategy as a whole.

Page 14

4.10 Priority 1. Our People (Workforce Profile): Ensure resilience and
engagement of the workforce 
Equalities 
4.10.1 With the undertaking of a recruitment and equal pay audit this year, focus on
the outcomes and recommendations from these, alongside continued
progression of the Equality Plan, demonstrate our commitment to ensure
there are no barriers to entering our employment. Attention will be being given
to advertising, application and assessment, use of data for monitoring and
consideration how to remove unconscious bias. 
4.10.2 A further equality data verification exercise will be undertaken as outlined
above with additional mechanisms for the safe and secure collation of data
being considered along with how to reach front line and non-pc users in the
workplace. 
4.10.3 Following successfully being awarded the Equally Safe at Work (ESAW)
Development Tier Accreditation in October 2023 time will be dedicated to
promoting this and embedding the mechanisms to support this cultural change
within the Council and considering how impacts can be monitored and
assessed prior to moving on to the Bronze Tier. Work is underway to support
the Council’s re-submission to re-validate the Armed Forces Gold Award
which will take place in August 2024.   
Wellbeing 
4.10.4 Improvements to the stress risk assessment form will be carried forward into
2024/25 and work will continue to raise awareness of the new Vivup employee
benefits platform and AVC Wise partnership.  This has become particularly
important given the decision to withdraw from the counselling contract as
employee counselling provision is available through Vivup. 
4.10.5 To support this work and improve the monitoring of the impact on employee
wellbeing, improvements will be made to the workforce planning console in
relation to absence information provided to managers.  This will help to ensure
that employees are being offered support in a timely manner and in
accordance with the Support Employee Wellbeing policy.   
4.10.6 Now integrated into the organisational priorities, the Employee Wellbeing
Strategy continues to focus on priority areas, responding to the needs of the
organisation. There will be regular progress reports to PMRG and JCF
including monitoring the impact of the resulting actions.  A focus on supporting
employee financial wellbeing will continue.

Page 15

Employee Engagement
4.10.7 As the Council is facing significant financial challenges it is crucial that we
continue to support employee engagement and ensure all employees have a
platform where their voices can be heard and that they are fully aware of
where supports can be accessed and in times of change feel supported and
valued.  Therefore, continued support of employees in a virtual environment
using MS Teams, trickle, webinars, on line training, surveys, employee forums
and support to ensure that employees feel engaged, supported and valued
will continue. Peer support groups/communities have been developed to allow
for collaboration and networking e.g. wellbeing advocates and MS Teams
ambassadors, digital champions. 
4.10.8  The established communication frameworks for national and local messages
to be shared will remain and there will be an increased focus on further
embedding the one-to-one/Be The Best Conversations in areas where we
have feedback that these could be improved. 
4.10.9 To compliment this and to provide further insight into levels of employee 
engagement, additional data sources will also be considered, in particular
information from Exit Surveys to inform an action plan for improvement.  
This further supports the Council’s commitment to the principles of the
Fairwork Convention, in particular ensuring employee voice. 
Work Styles/Flexibility 
4.10.10  Varying work styles have embedded in the Council and we continue to
pride ourselves as being a flexible employer. This will continue to be
promoted with development on a flexible/hybrid working policy underway. 
Policy 
4.10.11  Best practice and legislative changes will influence the review of several
policies in the coming year including Domestic Abuse, Flexible Working,
Paternity Leave Guidance and the progression of a policy/guidance for
sexual harassment. Consideration is also being provided to neurodiversity
and gender transition policies and guidance, to support our equality
framework. 
4.10.12   Following the launch of the Respect at Work Policy and Toolkit further 
efforts will be focused on commencing policy frameworks commencing with 
a Resolution Framework, this will act as the template for future policy 
frameworks as we progress.

Page 16

4.11 Priority 2. Recruitment & Retention: Current and predicted future workforce
gaps are addressed and core skill sets retained 
Year 1 People First – Employee Life Cycle – Recruitment 
4.11.1 The 5-year People First Plan will continue to focus on key improvements of           
the Employee Life Cycle with spotlights on the following:
• Year 1 – Recruitment
• Year 2 – On Boarding
• Year 3 – Development
• Year 4 – Retention
• Year 5 – Recognition 
4.11.2  Work will remain focused around progressing recruitment within the
workstreams including the recruitment working group. Progress has been
made in relation to scoping guidance requirements for managers, building
talent pools, selection processes and consideration of streamlining processes
and associated forms. 
4.11.3 Although delayed due to other priority work including budget savings,
commitment remains to bringing efficiencies around recruitment processes. It
is expected that this workstream will further progress this year and run
concurrently with the scoping and analysis of data and processes around all
aspect of ‘Onboarding’ for new employees entering the Council’s employment. 
Workforce Planning 
4.11.4 Following the Council’s Best Value Audit a further piece of audit work 
on workforce planning and innovation is planned for 2024. Given the current
and anticipated financial position for the Council, the requirement for re-
structure, developing different working methods and technological
developments, effective workforce planning will be imperative in ensuring
tools and resources are maximised and skills gaps met. 
4.11.5 Following the launch of the workforce planning tool kit, the coming year focus
will be on embedding and upskilling of strategies to support efficient workforce
planning. 
4.11.6 A core feature of workforce planning is quality data on which to base
workforce decisions thus developing the workforce planning console further in
relation to workforce data, trend analysis and forecasting to aid the
development and possible automation of service workforce plans for
managers to understand where their ‘reg flags’ are for action and where their
successes are, to build on.

Page 17

Job Evaluation 
4.11.7 Training has taken place to increase the amount of Job Analysts. We now 
need to ensure that they are all applying the SJC Job Evaluation Scheme
consistently through new job analysts being supported by experienced job
analysts. The SJC approved the 3rd Edition Amended Scheme in February
2024 and this has now been issued to all Councils. 
4.12 Priority 3. Structure & Roles: Service structures and delivery model/s are
stable, fit for purpose and future requirements 
SOM 
4.12.1 Once work is completed at level 2 (Chief Officers) and level 3 (Service 
Managers) of the SOM we will continue to ensure levels 4,5&6 have the 
correct spans of control and ratios required for future delivery.   
Budget Savings 
4.12.2 Priority will remain to supporting services into 2024/25 to implement the
required budget savings, review structures and service delivery requirements
in line with the Organisational Change processes whilst continuing to support
employee’s wellbeing and engagement during this time. 
Data & Information 
4.12.3 The rollout of M365 continues with users moving over to a cloud platform. The
introduction of M365 will bring many opportunities and access to tools. It will
be key to ensure the council is able to maximise benefits from the available
applications.  A 365 Centre of Excellence will be set up to ensure safe and
good practice of this exciting and innovative tool. 
4.12.4  A number of surveys on MS Outlook, MS Teams chats, posts on MS Teams
channels have been conducted and have helped form decisions about
retention policies. An approach to the roll out of SharePoint (for storage of
files and folders) is being developed. 
4.12.5 Continuous improvement initiatives, service design and leadership
development will continue through the year ahead as core organisational
deliverables. Services will continue to promote and engage in cross
organisational working, and explore the opportunities this provides, including

Page 18

the potential for retraining of employees into other areas, this particularly
relevant in supporting the Switch Policy. 
4.13 Priority 4. Skills & Capabilities: Current and future skills gaps and
capabilities are addressed. 
Learning and Development 
4.13.1 In 2023/24, the Council used funding from the apprenticeship levy to deliver
Excel and Outlook courses through West College Scotland.  Unfortunately,
this funding is no longer available so alternative sources of training are being
investigated for this coming year. 
4.13.2 The focus on digital literacy and skills will continue with Digital Skills building
blocks the basis of the first quarterly digital theme (which commenced in April
2024). 
5. People Implications 
5.1 Integration of workforce planning within wider organisational planning
processes ensures that workforce issues are effectively identified and
addressed. This supports the Council’s commitment to its’ employees in
relation to all aspects of their employment, ensuring that employees’ needs
are met, and that efficient and modern services are effectively delivered both
now and in the future. 
6. Financial and Procurement Implications 
6.1 There are no additional financial or procurement implications associated with
this report. There are funding streams associated with the initiatives
mentioned in this report, but these are already secured. 
7. Risk Analysis 
7.1 A robust approach to workforce planning ensures that the Council identifies
current and future needs and identifies potential risks to the council at an early
stage. This proactive approach allows strategies and policies to be developed
that ensure the continued delivery of best value services. 
8. Equalities Impact Assessment (EIA) 
8.1 A full EIA is not required in relation to the Council Workforce Plan as
individual assessments will be undertaken in relation to each area of work
referred to as it is progressed.

Page 19

9. Consultation 
9.1 The Strategic Leadership Group have been involved in the development of
the plan through preparation of the Delivery Plans and this report and
associated appendices have been provided to the relevant trade unions on
26th April 2024. 
10. Strategic Assessment 
10.1 The contents of this report and the workforce planning process supports the
Council’s Priority 4, ‘Our Council’, Objective 10 ‘Our workforce is resilient and
skilled where digital technology supports service delivery for our residents’ to
make the best use of both financial and human resources resulting in a
positive impact upon service provision. 
Victoria Rogers 
Chief Officer - People & Technology 
Date: 22 May 2024 
Person to Contact: Lisa MacGregor, People and Change Partner
16 Church Street, Dumbarton
Tel: 07949800801
Email: Lisa.MacGregor@west-dunbarton.gov.uk 
Appendices: Appendix 1 – Council Workforce Plan Progress update
2023/24 
Appendix 2 – Workforce Profile and Monitoring 31st
March 2024   
Background Papers: Council Workforce Plan 2017-2022:  Update & Annual
Action Plan 2022/23
Strategic Lead Area Workforce Plans (as part of Service
Delivery Plans) 2022-2027
The Workforce Planning Strategy and Framework 2022 –
2027 
Wards Affected:  None

Page 20

No embedded text on this page.