Erratum Notice 
Corporate Services Committee 
Date:  Wednesday, 24 May 2023
___________________________________________________________________ 
Time:  14:00
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:    Ashley MacIntyre, Committee Officer  
ashley.macintyre@west-dunbarton.gov.uk 
Dear Member 
ERRATUM 
I refer to the papers for the above Meeting of the Corporate Services Committee
which were issued on 11 May 2023 and enclose revised versions of the report and
appendices relating to Item 9, ‘People and Technology Delivery Plan 2022/23
Year End Progress and People and Technology Delivery Plan 2023/24’. These
supersede pages 51 to 88 of the original papers issued for the meeting.   
The revised report has been amended at paragraphs 4.3 and 4.4 (page 51), the
revised appendix 1 has been amended in relation to the equality stats (page 55 and
56) and the revised appendix 2 has been amended in relation to 2023/24 targets
(page 85). 
I apologise for any inconvenience caused.   
Yours faithfully 
PETER HESSETT 
Chief Executive

Page 2

Distribution:- 
Councillor Daniel Lennie (Chair)
Councillor Karen Conaghan
Councillor Ian Dickson
Councillor David McBride
Councillor Jonathan McColl
Councillor James McElhill
Councillor Michelle McGinty (Vice-Chair)
Councillor June McKay
Councillor Lawrence O’Neill
Councillor Martin Rooney
Councillor Gordon Scanlan
Councillor Clare Steel 
Chief Executive
Chief Officers 
Date of issue:  18 May 2023

Page 3

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People and Technology
Corporate Services Committee: 24 May 2023
Subject: People and Technology Delivery Plan 2022/23 - Year-end Progress &
People and Technology Delivery Plan 2023/24
1 Purpose
1.1 This report sets out the year-end progress of the 2022/23 Delivery Plan and
presents the new Delivery Plan for 2023/24.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved at year-end
and the new plan for 2023/24.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
4 Main Issues
2022/23 Year-end Performance
4.1 The 2022/23 Delivery Plan was presented to Corporate Services Committee
on 2 November 2022 with an interim progress update reported on 1 February
2023.
4.2 Full details of year-end progress are set out in Appendix 1.
4.3 All 17 actions due for completion by 31 March have been completed as
planned. 
4.4 Data is available for all of the nine PIs set out in the delivery plan. Of these,
four met or exceeded targets, one narrowly missed target and four
significantly missed target. The latter relate to the following: 
• % of our workforce who have declared a disability – 1.46% against a target
of 2.2%
• % of our workforce who have stated they are LGBT 1.06% against a target
of 2.5%
ITEM 9
REVISED
VERSION
Page 51

Page 4

• % of our workforce who are from a Black minority ethnic group 0.58%
against a target of 1%
• % employee attendance improvement rate (teachers & local govt.)  0.55%
against a target of 1%
4.5 Five of the nine PIs either improved over the previous year or sustained the
high performance recorded in 2022/23 (as shown in the short trend column in
Appendix 1) with five PIs performing similarly over the longer term (long trend
column).
4.6 The full set of PIs will be reported through the Council’s annual performance
reporting process once all data becomes available.
2023/24 Delivery Plan
4.7 The 2023/24 Delivery Plan is set out at Appendix 2.
4.8 Key priorities include: automation of processes; ICT infrastructure
improvements; Digital transformation; Continuous improvement; Improving
employee life cycle; Recruitment and sustainable employment and service
and Organisational resilience work-streams.
4.9 Implementation of the plan will be monitored by the management team with
mid-year and year-end progress reported to Corporate Services Committee
around November 2023 and May 2024 respectively.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to People and Technology may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1  Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
Page 52

Page 5

9.1  The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Victoria Rogers
Service Area: People and Technology
Date:  21 April 2023
_____________________________________________________________
Person to Contact:  Nicola Docherty
Nicola.docherty@west-dunbarton.gov.uk
Appendices:  Appendix 1: People and Technology Delivery Plan
2022/23 – Year-end Progress
Appendix 2: People and Technology Delivery Plan
2023/24
Background Papers: People and Technology Delivery Plan 2022/23 –
Corporate Services Committee, 2 November 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 53

Page 6

Page 54

Page 7

Appendix 1 - P&T Delivery Plan Year-end Progress
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Performance Indicator
2021/22 2022/23
Note Owner Value Status Value Target Short
Trend
Long
Trend
Percentage of ICT helpdesk
incidents fixed with half day of
being logged.
60.11% 58.11
% 52%
Overall in 2022/23 over 16,000 ICT
helpdesk incidents were resolved with half
a day of being reported. Performance
remains significantly above target and
shows continued improvement in the long
term.
James
Gallacher
% of our workforce who have
declared a disability 1.48% 1.46% 2.2
There was an error in reporting 21/22
figure in the previous year which has now
been rectified. There has been a further
slight reduction in the % of workforce who
have declared a disability. Action requires
to be taken to encourage reporting in this
Alison
McBride
APPENDIX 1
REVISED VERSION
Page 55

Page 8

area with positive re-enforcements as to
the reason this data is collected.
% of our workforce who have
stated they are LGBT 0.96% 1.06% 2.5%
There was an error in reporting 21/22
figure in the previous year which has now
been rectified. The LGB has shown 0.99%
and Transgender 0.07%. The data is
collected separately but has been added
together for this PI which shows a slight
increase in reporting.
Alison
McBride
% of our workforce who are from a
Black minority ethnic group 0.58% 0.58% 1.00%
There was an error in reporting 21/22
figure in the previous year which has now
been rectified. Therefore this % has
remained stable despite the exercise to
collate equality data and the Be seen, Be
heard campaign to encourage employees
to provide their equality data. Further
improvements will continued to be
progressed. WDC in numbers show WDC
BAME figure as 1.6%.
Alison
McBride
Disability pay gap 5.9% 3.68% 10%
The Disability Pay gap was a positive
figure last year and although this year the
gap has narrowed it still remains in a
positive position with those who have
declared a disability receiving an average
higher rate of pay than those who have
declared they do not have a disability. The
target has been left at 10% as any future
collections of data can impact on % figure.
Alison
McBride
The percentage of the highest paid
5% employees who are women 61.6% 62% 50% A slight increase of 0.4% showing that
62% of WDC’s top 5% earners are female
Alison
McBride
Page 56

Page 9

.2
Action Status Progress Due
Date Note Owner
Secure the Council’s Technology
Infrastructure
31-Mar-
2023
This action has been successfully completed. The ICT
team have tested and implemented the ‘LogMeIn’ remote
access technology. In addition to this significant progress
has been made in implementing the infrastructure that will
support the eventual roll out of Microsoft 365.
James
Gallacher
and that we are now + 12% on our target
of 50%
Gender pay gap 2.15% 1.78% 3%
The 2022/23 pay settlements are thought
to have positively the gender pay gap,
which saw a higher uplift for lower graded
SJC posts, which are predominately
female. The Teachers pay settlement (also
a predominately female group) would also
have had a positive impact. This has
resulted in a decrease of 0.37%.
Alison
McBride
% employee attendance
improvement rate (teachers & local
govt.)
New PI 0.55% 1%
Full Time Equivalent (FTE) days lost per
employee has reduced by 0.55% on last
year (14.55 FTE average days lost in
2021/2 to 14 FTE average days lost in
2022/23). As a new PI future targets will
be monitored
Alison
McBride
Percentage of Council employees
who feeling valued in the
workplace
79% 68% 75%
Trickle is being used alongside Pulse
surveys to understand what factors and
behaviours, employees believe influence
this and P&C will continue to monitor.
Alison
McBride
Page 57

Page 10

Action Status Progress Due
Date Note Owner
Enhance Security and Cyber
awareness programmes tailored
for hybrid working
31-Mar-
2023
This action has been successfully completed.
Over the last year the ICT team have deployed number of
actions to ensure security of the Councils system including
carrying out a forced operating system upgrade,
implementation of the Logmein solution to enable secure
control of WDC devices, updated and published the user
guide, carried out a phishing exercise and reviewed and
updated the Acceptable Use Policy.
James
Gallacher
Review and implement ICT
processes and service
improvements  in line with new
technologies
31-Mar-
2023
This action has been successfully completed. The ICT
survey has been carried out and the outputs will be
analysed to identify any improvements to enhance service
and user experience.
James
Gallacher
Upskill ICT team in new tools and
processes
31-Mar-
2023
This action has been successfully completed. Over the last
year the ICT team have ensured all the team have been
upskilled in key ICT products, in addition to this a carried
out a skills gap analysis has been carried across the ICT
management team and training has been delivered where
appropriate.
James
Gallacher
Identify and understanding the
workforce needs to ensure sound
workforce planning activities such
as skills gaps, succession planning
and employees are supported
throughout their career
31-Mar-
2023
This action has been successfully completed. Work will
continue to further embed Workforce Planning into Service
delivery planning with the development of a supporting
manager toolkit to accompany the revised Workforce
Planning Strategy and Toolkit. Workforce Planning
development actions are being embedded in the People
First year 1 actions.
Alison
McBride
Investigate root cause analysis,
employee feedback and data in
relation to workforce behaviour
31-Mar-
2023
This action has been successfully completed. To date
Trickle has been re-launched with success evident already
in relation to increased champion numbers and general
Alison
McBride
Page 58

Page 11

Action Status Progress Due
Date Note Owner
and practice and respond
accordingly with improvements.
trickle activity. Exit survey feedback continues to be
monitored, regularly reviewed and some improvements
made.
Improvements identified through employee voice and will
improve quality of data regarding work related stress in the
Council and ensure that there is a holistic approach to
support those experiencing stress (personal or work
related). Work on this has commenced
Occupational Health tender process has been initiated with
procurement and work around responding to the stress
risk assessment review continues.
Implement the actions from the
Equalities Outcome Monitoring
Plan
31-Mar-
2023
This action has been successfully completed. The EOM
Plan has been reviewed and a number of issues
progressed such as Veterans plan, Equally Safe @Work,
Respect & Work and a data collection exercise underway.
Alison
McBride
Develop and implement wellbeing,
employee engagement, equality
and training plans to enable
capabilities, improved resilience
and promotion of a diverse
workforce.
31-Mar-
2023
Mental health first aider group training has been
expanded. Further work underway to support employee
financial planning. Additional SG monies received to
support employee resilience with webinars planned for
workforce.
Equality action plan re-prioritised in line with People First
Strategy. Actions relating to data verification and Equally
Safe at work have commenced with plan linked
recruitment actions to the People First Strategy year 1
work
Alison
McBride
Page 59

Page 12

Action Status Progress Due
Date Note Owner
Actions to develop the workforce planning console being
scoped for development and roll-out.
Trickle re-launched and user activity increasing.
Develop and implement employee
life cycle plans in line with the
People First Strategy to attract and
retain the workforce.
31-Mar-
2023
This action has been successfully completed. Year 1 plan
has been started, priorities and lead officers agreed.
Progress has been made in relation to scoping of
development needs and opportunities to bridge any gaps
within the Human Resources Team building on a one team
approach.
ICT are liaising with Working 4U to review apprenticeship
opportunities with a view to attracting new employees.
ICT are working collaboratively with People & Change
team to review and improve employee on-boarding by
April 23.
Alison
McBride
Implement service review process
including role design, use of new
technology and new ways of
working to add resilience, address
gaps, and establish opportunities
for efficiencies
31-Mar-
2023
This action has been successfully completed. FfF
continues to support services and technology will be
employed to support year 1 People First plans.
Microsoft 365 is currently being deployed to service areas
and will continue over the coming months and a Centre of
excellence will be setup to ensure maximise use and
benefits of the 365 solution.
Alison
McBride
Page 60

Page 13

Action Status Progress Due
Date Note Owner
SOM project well underway to align HR and Finance
digitally in one system will identify gaps and establish
opportunities for improvement.
Freshservice system review undertaken and improvement
put in place to improve the system. Plan to publish the
system externally to allow easier reporting of
incidents/requests.
Device Updates – review of technology to improve update
process with remote feature implemented to allow
employees to update devices from home.
Church Street ICT Performance – review of issues
undertaken and various technology changes implemented.
Review and improvements will continue and plans are
underway to replace existing wireless hardware with new
technology to ensure performance is fit for purpose.
Review of structure, roles and development opportunities
to support recruitment and retention in ICT. Due to
continuing sector recruitment challenges especially in
public sector, ICT engaged with West Scotland College to
discuss a new approach to recruitment, and to develop
and equip graduates with the skills and experience
required to deliver the role and also be ready to progress
to 1st line analyst posts after a 2-year period.
This exercise is being completed alongside a redesign of
ICT structure and a review of resources to identify what
Page 61

Page 14

Action Status Progress Due
Date Note Owner
skills and support model the ICT service requires moving
forward, this is to ensure we can deliver new technology,
support hybrid working and meet service demand and
expectation.
Develop and implement training
plans and development
opportunities to improve
capabilities and resilience within
the workforce.
31-Mar-
2023
This action has been successfully completed. Corporate
budget being focussed on supporting digital skills and
M365 skills particularly on the supporting of the
technical/security element.
Scoping of development opportunities to bridge any skills
gaps with HR Team
In addition to 365, ICT teams across service also attending
training in technical areas such as Telephony technology
and Cyber Security to ensure skills gaps are filled,
resilience built in and development opportunities provided.
Continuous review of training is in place to ensure we are
equipping employees with right skills to implement and
support new technology.
Internal ICT development opportunities created to improve
resilience and ensure skillsets such as line and project
management are developed.
Alison
McBride
Page 62

Page 15

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Workforce
Management
System not fit
for purpose
There is a risk that the WMS
system is not fit-for-purpose
thereby requiring manual
workarounds restricting the level
of automation impacting on
efficiencies
4/04/23
This risk remains current due to
the manner in which Frontier
deploy improvements and
support the system development
in line with operational
requirements. 
Arun Menon
Challenges in
protecting the
Health and
Safety of
Employees and
Others
Failure to meet the Council’s
duty to protect the health, safety
and welfare of its employees
and other people who might be
affected by its business
5/04/23
The H&S team continue to review
and streamline key service areas
such as Corporate risk, Safety
Management Standards and
learning. Figtree has seen
improvements in how risk
assessments are managed and
the team are looking to build on
this with hazard reporting. A
newsletter has also been
developed to update and promote
good practice. The team continue
support all H&S committees and
RPO's to ensure a consistent
approach. The team are
continuing to improve the process
in managing health surveillance
with OH& line managers. Fire
safety management is ongoing
across the authority including fire
risk assessments and fire safety
training.
Alison
McBride
Page 63

Page 16

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Complexities in
ensuring an
appropriately
resourced and
resilient
workforce
Failure to ensure that there is an
appropriately resourced and
resilient workforce in place to
meet future organisational
needs, in effectively executing
the Council’s 2022-27 Strategic
Plan.
5/04/23
Workforce planning has
developed well alongside service
delivery planning. Workforce
planning strategy 2022-2027 was
agreed at Corporate Services
Committee in February 2023.
People First Strategy is in place
covering 2022-2027 and this is a
consolidation of a number of
areas: well-being, employee
engagement, workforce planning,
learning & development and
digital. This also has an ambitious
improvement plan linked to the
employee cycle. Work on the first
stage of this is recruitment and
work is well underway.
WDC are recognised as leading
in terms of adapting flexible
working practices. A recent report
around the use of Church Street
offices has reinforced employee
behaviour and expectation
around accessing flexible
working.
Alison
McBride
Page 64

Page 17

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
A robust package of wellbeing
resources continue to be
available, absence levels are
closely monitored, with personal
stress and minor ailments
absences prevalent.
Development course for mid to
senior leaders is ongoing with
positive feedback received.
Trickle relaunch is ongoing
across the whole of the
organisation to ensure this tool is
better used for employee
feedback and engagement.
There will be a further promotion
of the Trade Union Learning
Agreement which encourages all
employees to participate in
regular learning and development
and now encompasses some
volunteering opportunities.
In-house designed Fit for Future
programme continues to support
services and the team will review
and improve the process.  
Page 65

Page 18

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Threat of Cyber-
attack
Data, systems and/or
infrastructure are impacted as
result of security attacks which
are increasing in number at a
time when this threat is already
placing demands on resources
to deliver increased levels of
security controls.
17/04/23
ICT continues to follow NCSC
guidance and implement
additional tools and fixes as
identified.
Recent focus has centred on
extending the resources available
in the ICT security team to build
resilience and experience within
the service. Resourcing of
security team will continue to be
examined as part of normal ICT
service design management
processes.
Employees have also been
upskilled by attending industry
standard training courses such as
CISP.
There is a continuous review of
the process to apply security
updates, patches and software
deployments. Recent
improvements has been
implemented to automate the
update processes where possible
and new technology to control,
secure and manage remote
accessing of devices
James
Gallacher
Page 66

Page 19

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Geo-blocking to GB remains in
place and the geo-political
situation continues to be
monitored.
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Statu
s Progress Due Date Note Owner
Implement statutory Payroll
changes
31-May-
2022 This action has been successfully completed. Arun Menon
Undertake annual Payroll Audit 21-Dec-
2022
This action has been successfully completed. The
annual audit has been completed by all eight strategic
teams.
Arun Menon
Continue to develop automations
around HR & payroll system,
sickness absence and pension
calculations and wider council
services
31-Mar-
2023
This action has been successfully completed. Progress
has been made across a number of council wide
automation projects. These projects include working with
some complex issues and systems and we will continue
to monitor any challenges and ensure we are making
good progress to ensure we achieve our overall
ambitions in line with the council strategic priorities.
Arun Menon
Embed H&S commitments with
service delivery and workforce
planning. Build and support
31-Mar-
2023
This action is complete. Corporate H&S have met all of
their aims and objectives as set out in their Corporate
Plan for 2022/23.  Quarterly health and safety
Alison
McBride
Page 67

Page 20

Action Statu
s Progress Due Date Note Owner
workforce groups to promote good
practice
committees are undertaken where actions, incidents, risk
assessments and various other H&S issues are
discussed with all services and TU colleagues. Regular
improvements to Figtree are being undertaken to
enhance current features. RPO guidance and e-learn
module has recently been updated, a new H&S
inspection programme is being developed and quarterly
H&S newsletters are published.  H&S regularly meet with
TUs to discuss any ongoing issues and various risk
assessment working groups meet on a regular basis and
are making good progress.
Continue to build on data
usage/skills to improve decision
making and accountability. Raising
user awareness, risk assessments
and investigating technology
implications
31-Mar-
2023
This action has been successfully completed. The
console continues to be developed as does the
organisations knowledge around better use of data.  A
data maturity assessment has been undertaken and
plans are in place to continue progress.  WDC continue
to use the apprenticeship levy funds to support digital
skills across the workforce.  A digital skills framework
has been developed to further support.  A centre of
excellence is planned to support M365 usage.
Alison
McBride
Create a collaborative council wide
approach to transformation, using
service design and making best
use of people/tools/systems to
improve service delivery
31-Mar-
2023
This action has been successfully completed. Fit for
Future, service design and a view to support the
organisation with transformation is underway.  People
First strategy year 1 plans have commenced as has a
review of the Job Evaluation process and practice.  A
further shorter tool Assess, Improve, Measure has been
developed and has been tested with the People First
Year 1 improvement activity.
Alison
McBride
Page 68

Page 21

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Keeping abreast of
developments in the
innovative use of
Information
Technologies
Failure to keep
pace with
changing
technology
environment
21-Mar-
2023
Wi-Fi Upgrade – project in progress to replace
end of life Wireless Access Points in all WDC
locations. New technology will support modern
WIFI 6 and 6E technologies and deliver added
improved capacity and robust connections.
2nd Phase of WDC mailboxes migrated to
Microsoft 365 cloud platform enabling secure
authentication access from anywhere and any
device. Laptop and mobile phones now being
migrated to MS Intune to enable control and
secure management of devices.
Review of remote access technology redesign
underway to accommodate the increased demand
of hybrid working. Reconfiguration of windows
updates technology and process underway with
the aim reduce disruption to employees. Project
underway to publish ICT Freshservice Helpdesk
system externally and available to our customers
on any device.
ICT Technology workshops scheduled to map and
agree our technology vision, to plan upgrade of
core infrastructure environment and to improve
users’ desktop experience.
Automation project underway for data matching,
for improving ICT system & network status page
James
Gallacher
Page 69

Page 22

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
on WDC Intranet. Data Domain. SAN – new
storage area network installed and data migration
plan in progress.
Network Switches – Majority of switch
replacement project now complete. Next switch
update required for EOL equipment expected
2026. Server Software upgrade - project is
underway to upgrade 125 servers to latest
version.
Action Status
Cancelled
Overdue
Not on track
In Progress and on track
Completed
Risk Status
Alert
High risk
Warning
OK
Unknown
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Long Term Trends
Improving
No change
Getting worse
Short Term Trends
Improving
No change
Getting worse
Page 70

Page 23

2023-24
DELIVERY PLAN
People and Technology
APPENDIX 2
REVISED VERSION
Page 71

Page 24

Contents
1. Introduction ............................................................................................................................................................................2
2. Performance Review .............................................................................................................................................................2
3. Strategic Assessment ............................................................................................................................................................6
4. Resources ........................................................................................................................................................................... 11
Finance .......................................................................................................... 11
Employees ..................................................................................................... 12
Appendix 1: Action Plan ................................................................................................................................................................. 14
Page 72

Page 25

1. Introduction 
People and Technology comprise a wide range of services covering Strategic HR, Organisational Development & Change and
Digital, ICT, Transactional Services (HR advice, pensions and pay), Health, Safety and Risk and Organisational Resilience. It is
one of 8 strategic areas responsible for delivering the Council’s Strategic Plan. Key actions to help achieve that are set out in this
Delivery Plan, together with actions to address any performance issues and service priorities identified in the planning process. 
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services
Committee twice yearly, at mid-year and year-end. 
2. Performance Review 
The management team completed a detailed review of 2022/23 performance, focusing on the following: 
• 2022/23 Delivery Plan year-end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• Continuous Improvement (Fit for Future reviews);
• ICT Annual Customer Satisfaction Survey;
• National Digital Office programmes;
• Cabinet Office and Scottish Government Security compliance and guidance; and
• Other benchmarking/feedback etc. 
This review highlighted our key achievements in 2022/23 as well as the challenges to be addressed in 2023/24. These are
summarised below. 
Key Achievements 2022/23 
Transactional Support
Page 73

Page 26

• Continued to develop enhancements to the Workforce Management System (WMS) solution facilitating increased
functionality to simplify data gathering and reporting for users.  This included a range of upgrades to the system minimising
downtime for users.
• Implemented electronic timesheets submission council-wide saving time both in transactional teams and service teams.
• Completed payroll audit on time and processed multiple, multi-year pay awards and migrated employees on 2-weekly to 4-
weekly and monthly pay-runs.
• The team has also been successful in developing automations within key process areas which will continue into 2023/24. 
ICT
• Microsoft 365 project – first and second-phase mailboxes migrated to 365 cloud platform and council email now available on
any device from anywhere for migrated users. 
• Delivered ICT Security training course materials and Cyber Security Awareness sessions for Senior Management Teams and
delivered phishing exercises across the organisation; upskilled ICT employees with industry-standard training in
infrastructure, desktop and cyber security fields.
• Replaced 1400 PCs & laptops in schools, early years establishments and Libraries; replaced 1200 Chromebooks in schools
and now host 12,000 Chromebooks on our Education network and upgraded creative technology software in all high schools;
upgraded 4800 PC’s & laptops across Corporate and Education estate to ensure they are fully patched and secure with latest
operating systems.
• Achieved satisfaction level of 74 % of employees either extremely satisfied or satisfied with ICT service which, given the scale
of the transformation work, is positive.  
• Delivered Network infrastructure Improvements: 
o Council Wi-Fi replacement project underway to upgrade Wi-Fi access at 76 council locations; 
o Upgraded Storage Area network;
o Implemented SIP trunking telephony to host telephone lines and calls in the cloud;
o Replaced ageing server, switch and firewall hardware; and
o Implemented Network Traffic analysis solution to diagnose and identify causes of high bandwidth usage.
• Implemented a secure remote-control solution to remotely resolve issues with PCs, laptops and mobile phones and
implemented a solution to manage and apply critical security updates to off-network laptop devices.
• Assisted in the delivery of service area transformation projects:
o New Renton Campus;
o Migration of Criminal Justice LC/CMI system to cloud;
o Improvements to Citizen PC access in all libraries; and
Page 74

Page 27

o Upgrade of Creative Curriculum software for high schools. 
People and Change
• Implemented a range of key People and Change Frameworks including; the People Frameworks and updated learning
pathways; Digital Skills Support Framework launched encouraging digital champions to promote digital learning across the
organisation; People First review completed with the implementation of recruitment improvements underway; 
• Work Force Planning Strategy & Framework reviewed for 2022-2027, in place and aligned to strategic service planning
processes and the People First Strategy;
• Completed the implementation of the full suite of leadership development programmes, including the launch of Quantum
(senior management development) programme and the delivery of all Management programmes offered both virtual or in
person;
• Undertook and received a positive Digital Maturity review by Scottish Digital Office for Local Government & Data Maturity
review by Scottish Government; 
• Supporting continuous improvement, the People and Change Team completed seven Fit for Future service reviews with key
recommendations making good progress and supporting budget-saving options;
• Implemented a range of Health & Safety improvements and business support including the development of a quarterly
newsletter shared with all employees and alerting them to relevant H&S information; assisting Council Services in the
creation and facilitation of quarterly H&S committee meetings and implemented a schedule for the management and
inspection of Scaffolds and inspection of all Building Services construction sites across WDC; and
• H&S team reviewed the Strategic Risks aligning them to the 2022-27 Strategic Plan. 
Business Resilience
• Delivery of HSCP Incident Officer Training; Category 1 Agencies, under the Civil Contingencies Act 2004 (Scotland)
Regulations 2005, each have their own Incident Management Systems for responding to and managing Major Incidents
and/or Serious Emergencies.  Integrated Joint Boards (IJBs) are now designated as Category 1 Agencies.  This means if an
incident occurs that requires a coordinated response from the Council or indeed HSCP trained incident officers can be
deployed to support the response. Supporting the Health and Social Care Partnership as Category 1 responders to ensure
plans are updated and reviewed to meet Category 1 status as well as training key officers to respond to an on-scene incident. 
• Delivery of Council Incident Officer Training; The CIO training regime implemented as a core component of the CCS’ training
and exercising programme is central to equipping suitably designated officers with the necessary range of knowledge and
skills to perform the Council Incident Officer role in an incident. 
Page 75

Page 28

• Delivery of Loggist Training; During an incident, a Loggist is required to keep a log of all decision-making/relevant information
for an individual decision-maker representing the Council and/or HSCP. 
Challenges 
Resilience/ Capacity Challenges
• Across People and Technology, there were several challenges relating to increased demand for support from services, which
is anticipated to be an ongoing pressure in future years.  The workforce levels of the service has reduced in line with budget
constraints which is putting pressure on services to meet competing demands. Over the last few years, we have encouraged
services to become more self-reliant by introducing self-serve and developing automation of key processes to promote
efficiency in time-consuming tasks, however, we have had limited buy-in from wider services areas and maintaining built
automation with key employees leaving the team. Similarly, the take up of service champions to assist with key priorities,
such as digital transformation, has been slow. In 2023/24 we will continue to promote automation and self-reliance.  
• In ICT and Transactions Support there were challenges around the recruitment and retention of a skilled workforce. This led
to some challenges in delivering fully on the ambitions of the digital transformation project. It also led to pressure on other
areas of the team as individual employees temporarily filled gaps in key operational roles. In 2023/24 we will continue to
explore opportunities to encourage and enable recruitment to these key services whilst exploring career development
pathways to maximise the retention of these skills. 
• The biggest challenge for the People and Change team was, and will continue to be, the exponential rate of change leading
to increase demand for the service to support employees, support council-wide projects such as the roll-out of Microsoft 365,
structure changes, changing roles and skillsets with limited resources and increasing workload. This is leading to a much
more demanding role as competing priorities such as wellbeing, workforce capability building and project delivery are
balanced with ensuring that ongoing financial savings and service delivery expectations are met.
• Maintaining a range of WMS developments with increased workload pressures and demands for areas such as HSCP,
Facilities Management, Education and Housing. 
Technological Challenges
• Another key challenge is the continued technical challenges with Frontier (WMS). These issues have prevented the WMS
team from maximising system automation to deliver efficiencies, especially in payroll.  The issues continue to be managed
through discussions with the supplier at the national level.  In 2023/24 we will continue to identify Robotics Process
Automation (RPA) projects to address some of the legacy system issues.
Page 76

Page 29

• Hybrid Working Challenges
o Managing and mitigating the increased risk of Cyber Security threats (on-premise/remote) including updating off-
network windows devices to ensure they are secure.  Raising user awareness, risk assessments and investigating
new and replacement technologies have helped to manage this challenge.
o Deploying new technologies and upgrading existing technologies when dependency is heightened e.g. upgrades and
maintenance of remote access and citrix environments.
o Increased demand for ICT support - supporting home working as well as using an appointment service to deliver
cluster support model in corporate environments. 
• Sourcing ICT hardware with supply chain issues.
• Managing storage growth and backups and encouraging service areas to carry out housekeeping tasks in line with their
retention policies.
• Increased revenue costs as organisations /suppliers move from a capital-based license model to revenue funded or when
transitioning to cloud-based services e.g. MS licencing and supplier hosting costs.
• Deploying and supporting Microsoft 365 whilst training staff in new technology.
• Processes underpinning iConnect – an online solution for submission of pension data to the pension office causing a large
volume of additional workload for the small payroll team. 
3. Strategic Assessment 
The People and Technology management team completed a strategic assessment to determine the major influences on service
delivery and priorities in 2023/24. These are summarised below. 
Financial Challenges
The entire public sector is continuing to face significant financial challenges due to a range of factors including inflationary cost
increases, rising utility costs and insufficient funding to support the delivery of front line and back office services. The Council are
currently faced with an estimated cumulative funding gap in 2024/25 of £9.7m rising to £29.5m by 2027/28.  We will continue to
monitor the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected
Members throughout 2023/24.   
Page 77

Page 30

These challenges mean further action is required to balance our budget and protect services for residents. This will mean that
within People and Technology, available funding will be reduced over time and we will need to reconfigure how we work, what
we do, where we work, and potentially reduce the number of people employed. In this context, we will aim to continue to provide
a sustainable, quality service to internal clients and the public. 
Automation of Processes and Information Provision
Staff across the Council are employed in manual processes and information provision, such as processing invoices and updating
transactional spreadsheets. In 2023/24, we will continue to pursue opportunities across the council to improve efficiency. Many
such processes can be automated, providing benefits such as faster service delivery, improved quality and greater flexibility, as
well as enabling employees to refocus on more complex and meaningful tasks rather than those that are repetitive and
mundane. 
Infrastructure and Technology 
Technology plays an increasing role in everyday life to deliver transformational services in West Dunbartonshire. The Covid-19
crisis confirmed the foundational importance of digital technologies in all aspects of life. The service delivery model arising from
the pandemic will require a review and potential redesign of the Council’s IT infrastructure architecture. Managing remote/hybrid
technical environments will involve redesign, investment in new and or replacement technologies as well as upskilling the ICT
team. Some improvements have already been implemented and this will continue. 
ICT will review the existing technologies, assess in-flight technology implementations (e.g. 365 implementation) to maximise the
investments made, decommission where possible and streamline the range of technologies ICT need to support and users need
to access. Over the coming year, we will undertake a pilot scheme to review MS SharePoint & One Drive implementation. A
Citrix Storefront Replacement Project will review options to deliver business applications to council employees and improve the
digital experience and will carry out a review of remote access technology to offer a streamlined smooth remote access facility.
Alongside this, we will continue with the device replacement project focusing on Chromebooks, laptops and PC’s and mobile
phones. 
To deliver a secure, reliable and futureproof wireless connection, over the coming year we will focus resources on replacing
ageing wireless hardware in all council locations with new state-of-the-art Wi-Fi 6 technology as well as extending and upskilling
the ICT security team to manage and reduce the risk of Cyber Threat. 
Page 78

Page 31

To support continued and efficient service delivery, in 2023/24 we will carry out a review of the ICT Helpdesk System; this will
improve employee’s ability to log incidents from any device and anywhere and will include the implementation of a new Tech
Support Desk at Church Street to provide immediate walk-up support facility to council employees thereby minimising any
potential downtime and disruption to service delivery. We will also review how we manage helpdesk tickets and implementing
automated workflows to ensure all incidents and requests are automatically assigned to the appropriate teams which will improve
resolution times.
Digital technologies and innovation have become critical to support business delivery, however, an increased demand for IT,
data science and technical skillsets is fast outstripping the nation’s supply. West Dunbartonshire, like many other organisations
globally and nationally, are experiencing a technology skills gap. To address the challenge of skills shortages and recruitment, in
2023/24 we will adopt a new approach to ICT recruitment and look towards developing a graduate partnership programme with
West College Scotland; in addition to this we will promote ICT careers at Education Careers events and work in partnership with
Working4U to update modern apprenticeships opportunities
Fit for Future Reviews (FfF)
In 2020, to support continuous improvement, the Council embarked on a programme of Fit for Future service reviews. Using a
range of tools that encapsulates service design and employee engagement, information is gathered and reviewed to identify
improvements and to ensure our services are efficient and that we make the best use of our resources. During 2023/24 we will
further review the FfF programme and will place additional focus on savings opportunities. This will help service managers and
teams see potential savings areas to assist with the budget deficit. 
Improve step1 in the employee life cycle – ‘Recruitment’
The recruitment life cycle begins when a need for a post is identified until the point where the preferred candidate is identified. 
An eight-week review of this step was completed in 2022/23 and improvements in this area will be implemented. The recruitment
step will be streamlined, improved and modernised for recruiting managers and for those applying for jobs in WDC (internal or
external). 
Workforce Planning
The Workforce Planning Framework and Strategy for 2022 – 2027 has been reviewed and implemented ensuring processes are
aligned to the Strategic Planning Process and reflects the key priorities of the People First Strategy. During 2023/24 focus will be
on further embedding the framework by developing managers’ knowledge and skills to enable effective workforce planning within
the context of the challenges faced to support Service delivery plans and sustainable people resources to deliver.
Page 79

Page 32

Sustainable Employment and Organisational Design
Continuing to ensure employees skillset/development continues to grow and can be supported. If this is not prioritised,
recruitment and retention difficulties may be exacerbated with attendance, well-being and workforce motivation impacted. Skills
may not keep pace with new technology/tools/developments with WDC becoming poorly placed to capitalise/deliver on
improvements 
Continue to manage council risk and ensure sound Health & Safety practices are embedded. Poor H&S practice creates
significant risk for the council both in terms of financial and reputational damage. Sound H&S practice supports employee
engagement and collaboration with good workforce practices, without this commitment employee engagement, will suffer. 
Transformation and Continuous Improvement 
Digital Transformation
The People First Strategy is ensuring that we put people at the heart of our approach to digital transformation, this is supported
by a more cohesive and holistic plan involving learning, engagement, wellbeing and workforce planning. This ambitious plan will
ensure all aspects of the individual is considered as we progress with digital transformation from 2022-27. 
To facilitate this, the service needs a joined-up approach to supporting digital transformation, growing employee skills and
working with citizens to adapt and change how services are delivered.  To do this structures require to be reviewed and
resources (financial and workforce) need to be identified to ensure plans and processes are in place alongside the ability to
constantly monitor progress on keeping pace with digital transformation and technology.  To support this the Digital
Transformation Board has been widened to allow a more holistic, one-council approach to be adopted.  This has created a wider
virtual digital team and ensured focus and resources to be employed and prioritised to ensure delivery of the council’s strategic
aims. 
The speed of technological advancement has been rapidly increasing and will continue to do so. This will impact employees,
citizens and services as the Council seeks to both capitalise and adapt to these. Additional support and upskilling has been
evident with the rapid deployment of MS Teams and this will continue as the team support the rollout and maximisation of M365. 
In 2023/24 we will continue to build good data practices/structures council-wide. Managing and maximising data usage and
improving skills is key to ensuring employees and users understand benefits and threats. If this is not continued it increases the
Page 80

Page 33

potential for both reputational and financial risks. It will also impact decisions and understanding on progressing improvement
activity and planning for the same. 
We will also continue to support development of the WMS to aid wider process and digital transformation and continue to
develop automations within transactional processes through collaborative practice, service design and maximising digital
practice, through the reviewed Fit for Future programme. Technology is developing quickly and WDC needs to ensure that they
keep pace in order to capitalise on the benefits this brings to service improvement, costs and delivery. This must be looked at
collaboratively with users and employees to ensure understanding, best practice and skills required. 
Service and Community Resilience
The Civil Contingencies Officer has continued to support West Dunbartonshire’s resilience planning, and response arrangements
this includes an update of service Business Continuity (BC) plans, this process is typically reviewed on an annual basis however
if there are any service changes then the plan is reviewed to ensure it remains up to date. The service BC plans essentially feeds
into the Strategic Business Continuity plan to provide reassurances to Chief Executive and Chief Officers that essential services
have been considered and adequate risk measures are put in place to minimise disruption. To complement WDCs Business
Continuity plans, the Civil Contingencies Officer has set up a Short Life Working Group to do a ‘deep dive’ into Power Resilience
due to the complexities surrounding this risk. The group utilises the Operational Resilience Group structure, the purpose of the
group is to provide confidence to the Chief Officers that service managers have considered this risk, and raised awareness
across their service, especially with employees. The group seeks to determine what realistically can continue to be delivered and
the ways in which services will manage this when there is a complete blackout. 
CCS will actively participate in this year’s Experiential Learning (on hold during the pandemic). This event provides an
opportunity to meet with every pupil in an age group (typically Primary 7) across the area as part of a multi-agency event,
emphasising key advice for our young persons. Currently, the CCS provides messaging on preparing a “Grab Bag” as a key
preparedness measure for emergencies affecting the house. 
Budget Sensitivity Analysis
Budget Sensitivity Analysis In reviewing the service budget projections, consideration has been given to sensitivity of these
budgets, in particular for higher risk/ higher value budgets which may have a significant impact on budgetary control and future
budget projections. The analysis has considered sensitivity around demand, costs and charges, and income levels. 
Page 81

Page 34

Within this service, some budgets have been identified as being more susceptible to fluctuations however the UK’s exit from the
European Union may impact on the supply costs for goods and services such as IT equipment and associated license and
maintenance costs. 
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed People and Technology priorities
for 2023/24. Appendix 1 sets out the action plan to address them, including the relevant risks and the performance indicators and
targets that will enable progress to be monitored and reported to stakeholders. It also incorporates the Strategic workforce
actions. 
The Council has identified risks at both a strategic and service level. Strategic risks represent the potential for the Council to take
advantage of opportunities or fail to meet stated strategic objectives and those that require strategic leadership. Service risks
relate to service delivery and represent the potential for impact on individual services, or the experience of those who work within
the services, i.e. employees, partners, contractors and volunteers or service users and clients in receipt of the services provided. 
In planning for 2023/24, the People and Technology team considered the Council’s strategic risks and identified risks specific to
the service. These are set out in the action plan at Appendix 1 alongside actions to mitigate these, with the aim of improving or
maintaining the current position (i.e. the current risk score). 
4. Resources 
Finance 
People and Technology has a net revenue budget of £7.428m and a capital budget of £2.685m in 2023/24. A breakdown by
section is set out below. We will make the best use of the resources available to deliver on key priority areas and secure
external/match funding where this is possible. 
Page 82

Page 35

Section Budget (Figures subject to ongoing
verification)
Gross
Expenditure
2023/24 (£m)
Gross Income
2023/24 (£m)
Net Expenditure
2023/24 (£m)
Capital Budget
2023/24 (£m)
Transactional (part of Business Support) 0.915m -0.079m 0.836m 0.000m
People & Change (HR, H&S, Risk, Change,
OD & Digital) 2.092m -0.050m 2.042m 0.046m
ICT 5.049m -0.499m 4.550m 2.639m
Total 8.056m -0.628m 7.428m 2.685m 
Employees 
Employee Numbers 
The headcount and full time equivalent employees in each section (as of 31st March 2023) are as follows: 
Absence in 2022/23 
The quarterly absence statistics for People and Technology are shown below together with the Council average for the same
periods for comparison. The figures for People and Technology have been lower that the Council average throughout 2022/23. 
Absence in 2022/23 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
P&T Service  1.19 1.41 1.25 1.8 4.23
Service Area Headcount FTE
Transactional (part of Business Support)  24 21.9
People & Change (HR, H&S, Risk, Change, OD & Digital) 31 31.11
ICT 55 50.19
TOTAL 110 102.59
Page 83

Page 36

COUNCIL WIDE TOTAL 3.86 3.28 4.42 4.02 14.00 
Page 84

Page 37

Appendix 1: Action Plan
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Performance Indicator 2023/24
Target Owner
Percentage of ICT helpdesk incidents fixed with half day of being logged. 60% James Gallacher
% of our workforce who have declared a disability 2.2% Alison McBride
% of our workforce who have stated they are LGBT 2.5% Alison McBride
% of our workforce who are from a Black minority ethnic group 1% Alison McBride
Disability pay gap 10% Alison McBride
The percentage of the highest paid 5% employees who are women 50% Alison McBride
Gender pay gap 3% Alison McBride
Percentage of Council employees who agree or strongly agree that in general, they feel valued in their role at
WDC
75% Alison McBride
% employee attendance improvement rate (teachers & local govt.) 1% Alison McBride
Action Due Date Owner
Secure the Council’s Technology Infrastructure 31 Mar 2024 James Gallacher
Page 85

Page 38

Action Due Date Owner
Complete ICT Wi-Fi replacement programme 31 Mar 2024 James Gallacher
Review and implement ICT on site Tech Desk service 31 Mar 2024 James Gallacher
Develop and establish Skills programme to address ICT skills shortage 31 Mar 2024 James Gallacher
Coordinate ICT device replacement programme 31 Mar 2024 James Gallacher
Pursue automation opportunities across the council to improve efficiency 31 Mar 2024 Arun Menon
Continue to drive service and community resilience to enhance overall resilience organisationally and in our
communities 31 Mar 2024 Jen Watt
Develop and implement wellbeing, employee engagement, equality and learning and development plans to
enable capabilities, improve resilience and promotion of a diverse workforce 31 Mar 2024 All Managers
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce 31 Mar 2024 All Managers
Develop and implement learning and development opportunities to improve capabilities and resilience within
the workforce. 31 Mar 2024 All Managers
Implement service review process including role design, use of new technology and new ways of working  to
add resilience, address gaps, and establish opportunities for efficiencies  31 Mar 2024 All Managers
Risk Description Current Assessment Target Assessment Owner
Workforce
Management System
not fit for purpose
There is a risk that the WMS system is not fit-for-purpose
thereby requiring manual workarounds restricting the
level of automation impacting on efficiencies
Arun Menon
Page 86

Page 39

Risk Description Current Assessment Target Assessment Owner
Challenges in
protecting the Health
and Safety of
Employees and
Others
Failure to meet the Council’s duty to protect the health,
safety and welfare of its employees and other people
who might be affected by its business
Alison McBride
Complexities in
ensuring an
appropriately
resourced and
resilient workforce
Failure to ensure that there is an appropriately resourced
and resilient workforce in place to meet future
organisational needs, in effectively executing the
Council’s 2022-27 Strategic Plan.
Alison McBride
Threat of Cyber-attack
Data, systems and/or infrastructure are impacted as
result of security attacks which are increasing in number
at a time when this threat is already placing demands on
resources to deliver increased levels of security controls. 
James Gallacher
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Due Date Owner
Implement statutory Payroll changes 31 May 2023 Arun Menon
Undertake annual Payroll Audit 31 Dec 2023 Arun Menon
Review and update FfF approach to improve budget efficiencies 31 Mar 2024 Alison McBride
Maintain and monitor employee wellbeing, engagement and workforce planning. 31 Mar 2024 Alison McBride
Page 87

Page 40

Action Due Date Owner
Continue to embed sound H&S practice 31 Mar 2024 Alison McBride
Implement improvements in recruitment life cycle processes 31 Mar 2024 Alison McBride
Risk Description Current Assessment Target Assessment Owner
Keeping abreast of
developments in the
innovative use of
Information
Technologies
Failure to keep pace with changing technology
environment  James Gallacher
Page 88