Agenda
Corporate Services Committee
Date: Wednesday, 2 November 2022
Time: 14:00
Format: Hybrid Meeting
Contact:  Ashley MacIntyre, Committee Officer
ashley.macintyre@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Corporate Services Committee as detailed above.
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Daniel Lennie (Chair)
Councillor Karen Conaghan
Councillor Ian Dickson
Councillor Diane Docherty
Councillor David McBride
Councillor James McElhill
Councillor Michelle McGinty (Vice-Chair)
Councillor June McKay
Councillor Lawrence O’Neill
Councillor Martin Rooney
Councillor Gordon Scanlan
Councillor Clare Steel
Chief Executive
Chief Officers
Date of issue:  20 October 2022 
Audio Streaming
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and
the Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice and Retention Schedules including, but
not limited to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Page 2

Page 3

CORPORATE SERVICES COMMITTEE
WEDNESDAY, 2 NOVEMBER 2022
AGENDA
1 STATEMENT BY CHAIR
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting be done
by roll call vote to ensure an accurate record.
5 MINUTES OF PREVIOUS MEETING 7 - 12
Submit for approval as a correct record, the Minutes of Meeting of the Corporate
Services Committee held on 17 August 2022.
6 MINUTES OF JOINT CONSULTATIVE FORUM 13 - 18
Submit for information and where necessary ratification, the Minutes of Meeting of
the Joint Consultative Forum held on 8 September 2022.
7  OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
8 CITIZEN, CULTURE AND FACILITIES DELIVERY PLAN 19 - 41
2022/23
Submit report by the Chief Officer – Citizen, Culture and Facilities providing the
Citizen, Culture and Facilities Delivery Plan 2022/23.
Page 3

Page 4

9 PEOPLE AND TECHNOLOGY DELIVERY PLAN 2022/23 43 - 59
Submit report by the Chief Officer – People and Technology providing the People
and Technology Delivery Plan 2022/23.
10 REGULATORY AND REGENERATION DELIVERY PLAN 61 - 89
2022/23
Submit report by the Chief Officer – Regulatory and Regeneration providing the
Regulatory and Regeneration Delivery Plan 2022/23.
11 RESOURCES DELIVERY PLAN 2022/23 91 - 109
Submit report by the Chief Officer – Resources providing the Resources Delivery
Plan 2022/23.
12 SUPPLY, DISTRIBUTION AND PROPERTY DELIVERY  111 - 125
PLAN 2022/23
Submit report by the Chief Officer – Supply, Distribution and Property providing
the Corporate Procurement Unit priorities within the Supply Distribution and
Property (SD&P) Delivery Plan 2022/23.
13 ANNUAL PROCUREMENT REPORT 127 - 179
Submit report by the Chief Officer – Supply, Distribution and Property providing for
information the Annual Procurement Report for 2021/22.
14 CORPORATE SERVICES BUDGETARY CONTROL REPORT  181 - 208
TO 31 AUGUST 2022 (PERIOD 5)
Submit report by the Chief Officer – Resources advising on the performance of the
Corporate Services budget for the period to 31 August 2022.
15 VARIOUS GRANT APPLICATIONS TO DUMBARTON 209 – 214
COMMON GOOD
Submit report by the Chief Officer – Resources providing details of three grant
applications to Dumbarton Common Good for consideration.
16/
Page 4

Page 5

16 COUNCIL WORKFORCE PLAN 2017-2022: UPDATE 215 - 261
AND ANNUAL ACTION PLAN 2021/22
Submit report by the Chief Officer – People and Technology providing an update
on the Council’s workforce planning activity for 2021/22.
17 BI-ANNUAL WORKFORCE MONITORING REPORT 263 - 270
Submit report by the Chief Officer – People and Technology providing workforce
monitoring information relating to the period 1 April 2022 to 30 September 2022.
18 STRATEGIC RISKS 2022-2027 271 - 295
Submit report by the Chief Officer – People and Technology setting out proposed
changes to the strategic risks for 2022-2027 following the Strategic Plan
developments.
19 THE PUBLIC INTEREST DISCLOSURE POLICY 297 - 315
AMENDMENTS AND ADDITIONS
Submit report by the Chief Officer – People and Technology providing an update
on amendments made to The Public Interest Disclosure Policy resulting from
recommendations made following an investigation by Internal Audit.
Page 5

Page 6

Page 6

Page 7

CORPORATE SERVICES COMMITTEE
At a Hybrid Meeting of the Corporate Services Committee held in the Civic Space,
16 Church Street, Dumbarton on Wednesday, 17 August 2022 at 2.02 p.m.
Present: Councillors Karen Conaghan, Ian Dickson, Diane Docherty,
Craig Edward*, Daniel Lennie, David McBride, June McKay,
Martin Rooney, Gordon Scanlan and Hazel Sorrell.
* arrived later in the meeting.
Attending: Peter Hessett, Chief Executive; Angela Wilson, Chief Officer –
Supply, Distribution and Property; Laurence Slavin, Chief Officer
– Resources; Amanda Graham, Chief Officer – Citizen, Culture
and Facilities; Alan Douglas, Manager of Legal Services;
Pamela Clifford, Manager of Planning, Building Standards and
Environmental Health; Arun Menon, Business Support Manager;
Alison McBride, Strategic People and Change Lead; Annabel
Travers, Procurement Manager; Adrian Gray, Finance Business
Partner; Karen Shannon, Section Head – Financial,
Administration and Control; Lisa MacGregor, HR Advisor; and
Ashley MacIntyre and Gabriella Gonda, Committee Officers.
Apologies: Apologies for absence were intimated on behalf of Councillors
Michelle McGinty and James McElhill.
Councillor Daniel Lennie in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor Lennie, Chair, advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
Councillors Diane Docherty, Daniel Lennie, June McKay and Gordon Scanlan
declared an interest in Item 18 as Directors of Clydebank Municipal Bank and
intimated that they would leave the meeting during consideration of the item.
ITEM 5
Page 7

Page 8

RECORDING OF VOTES 
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record. 
MINUTES OF JOINT CONSULTATIVE FORUM 
The Minutes of Meeting of the Joint Consultative Forum held on 16 June 2022 were
submitted and all decisions contained therein were approved. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
INTERIM CHANGE TO PAY FREQUENCY 
A report was submitted by the Chief Officer – People and Technology seeking
agreement of the proposed interim change to the 2-weekly payrun. 
After discussion and having heard the Business Support Manager in further
explanation of the report and in answer to Members’ questions, the Committee
agreed to approve the interim change to the 2-weekly payrun which will transition
employees to the 4-weekly payrun from 1 October 2022. This will initially be for a 12
month period with a review thereafter. 
RESPECT AT WORK POLICY AND PROCEDURE 
A report was submitted by the Chief Officer – People and Technology informing on the
new Respect at Work Policy and Procedure, seeking approval for implementation and
noting the planned approach for a Resolution Framework. 
After discussion and having heard the HR Advisor in further explanation of the report
and in answer to Members’ questions, the Committee agreed to approve the
Respect at Work Policy and Procedure (Appendix 1 to the report). 
Note: Councillor Craig Edward joined the meeting during consideration of this item. 
DECLARATION OF INTEREST 
Councillor Craig Edward declared an interest in Item 18 as a Director of Clydebank
Municipal Bank and intimated that he would leave the meeting during consideration
of the item. 
Page 8

Page 9

WDC ‘PEOPLE FIRST’ STRATEGY 
A report was submitted by the Chief Officer – People and Technology providing an
update on the proposed ‘people’ route to support delivery of the Council’s ambitious
strategic plan. 
After discussion and having heard the Strategic People and Change Lead in further
explanation of the report and in answer to Members’ questions, the Committee
agreed to note the new ‘People First’ Strategy which puts people at the centre of
Council transformation. 
PEOPLE AND TECHNOLOGY DELIVERY PLAN 2021/22 YEAR END PROGRESS 
A report was submitted by the Chief Officer – People and Technology presenting the
year-end progress report for the 2021/22 Delivery Plan. 
After discussion and having heard the Strategic People and Change Lead and the
Business Support Manager in further explanation of the report and in answer to
Members’ questions, the Committee agreed to note progress made on the delivery of
the 2021/22 plan. 
REGULATORY AND REGENERATION DELIVERY PLAN YEAR END PROGRESS
AND NEW DELIVERY PLAN 
A report was submitted by the Strategic Managers – Regulatory and Regeneration
providing the year-end progress of the 2021/22 Delivery Plan. 
After discussion and having heard the Chief Executive, the Manager of Legal
Services and the Manager of Planning, Building Standards and Environmental
Health in further explanation of the report and in answer to Members’ questions, the
Committee agreed to note progress made on the delivery of the 2021/22 plan. 
PROCUREMENT DELIVERY PLAN 2021/22 YEAR END PROGRESS 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing the year-end progress of the 2021/22 Delivery Plan. 
After discussion and having heard the Chief Officer – Supply, Distribution and
Property and the Procurement Manager in further explanation of the report and in
answer to Members’ questions, the Committee agreed to note progress made on the
delivery of the 2021/22 plan. 
Page 9

Page 10

CITIZEN, CULTURE AND FACILITIES DELIVERY PLAN 2021/22 YEAR END
PROGRESS 
A report was submitted by the Chief Officer – Citizen, Culture and Facilities providing
the year-end progress of the 2021/22 Delivery Plan. 
After discussion and having heard the Chief Officer – Citizen, Culture and Facilities
in further explanation of the report and in answer to Members’ questions, the
Committee agreed to note progress made on the delivery of the 2021/22 plan. 
RESOURCES DELIVERY PLAN 2021/22 YEAR END PROGRESS 
A report was submitted by the Chief Officer – Resources providing the year-end
progress of the 2021/22 Delivery Plan. 
After discussion and having heard the Chief Officer – Resources and the Business
Support Manager in further explanation of the report and in answer to Members’
questions, the Committee agreed to note progress made on the delivery of the
2021/22 plan. 
CORPORATE SERVICES BUDGETARY CONTROL REPORT TO 30 JUNE 2022
(PERIOD 3) 
A report was submitted by the Chief Officer – Resources advising on the performance
of the Corporate Services budget for the period to 30 June 2022. 
After discussion and having heard the Finance Business Partner in further
explanation of the report, the Committee agreed:- 
(1) to note that the revenue account currently showed a projected annual
favourable variance of -£0.314m (-0.93% of the total budget); and 
(2) to note that the capital account was showing a projected in-year underspend
of -£0.655m (-10.1% of in-year budget) due to 2 projects showing projected
underspends as a result of delays to these projects with explanations for
delays detailed in Appendix 6 to the report. The project life projection was
currently showing a projected underspend of £-0.096m (-1.0% of project life
budget). 
UPDATE OF VOLUNTARY GRANTS 2021/22 
A report was submitted by the Chief Officer – Resources providing an update of the
voluntary grants administered and awarded by West Dunbartonshire Community and
Volunteering Services (WDCVS) in 2021/22 in respect of Community Chest,
Playschemes, Cultural and Social Transport Support Funding Grants on behalf of the
Council and providing information on the position regarding the Provost’s Fund and
the Dumbarton Common Good Fund.
Page 10

Page 11

After discussion and having heard the Chief Officer – Resources in further
explanation of the report and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the position of the grants paid out by WDCVS, the Provost’s Fund and
the Dumbarton Common Good Fund; and 
(2) to approve a top-up payment of £2,710.96 to be made to the Provost’s Fund as
detailed in paragraph 4.10 of the report. 
EXCLUSION OF PRESS AND PUBLIC 
The Committee agreed to approve the following resolution:- 
“That under Section 50A (4) of the Local Government (Scotland) Act 1973 the press
and public be excluded from the meeting for the following items of business on the
grounds that it may involve the likely disclosure of exempt information as defined in
Paragraph 1 of Part 1 of Schedule 7A of the Act”. 
APPOINTMENT OF CHAIR 
At this point in the meeting, the Manager of Legal Services advised that, in the
absence of the Chair and Vice Chair, the Committee was required to appoint a Chair,
for the remainder of the meeting, from amongst its Members. 
The Committee agreed that Councillor Rooney be appointed Chair for the remainder
of the meeting. Accordingly, Councillor Rooney assumed the Chair and the business
of the meeting resumed. 
DECLARATIONS OF INTEREST 
Councillors Diane Docherty, Craig Edward, Daniel Lennie, June McKay and Gordon
Scanlan having earlier declared an interest in the following item of business, left the
meeting at this point. 
CLYDEBANK MUNICIPAL BANK 
A report was submitted by the Chief Officer – Resources regarding Clydebank
Municipal Bank Limited (CMB). 
After discussion and having heard the Chief Officer – Resources and the Section
Head – Financial, Administration and Control in further explanation of the report and
in answer to Members’ questions, the Committee agreed to note recommendations 1
and 2 of the report and that the report be considered by the Board of Directors. 
Page 11

Page 12

The meeting closed at 3.37 p.m.
Page 12

Page 13

JOINT CONSULTATIVE FORUM
At a Meeting of the Joint Consultative Forum held in the Civic Space, 16 Church
Street, Dumbarton on Thursday, 8 September 2022 at 2.00 p.m.
Present: Councillors Jim Bollan, Karen Conaghan, Craig Edward, David
McBride, Martin Rooney and Hazel Sorrell; Michael Dolan and
James Halfpenny* (EIS); Derek Hutchison and John Wagner
(GMB); Aly McCulloch and Susan Shannon (UNISON); and
Chris Rossi and Margaret Wood (Unite).
*Arrived later in the meeting.
Attending: Amanda Graham, Chief Officer – Citizen, Culture & Facilities;
Laura Mason, Chief Education Officer; Victoria Rogers, Chief
Officer – People & Technology; Laurence Slavin, Chief Officer –
Resources; Angela Wilson, Chief Officer – Supply, Distribution &
Property; Alison McBride, Strategic People & Change Manager;
Sylvia Chatfield, Head of Mental Health, Learning Disability &
Addictions, Health & Social Care Partnership (HSCP); Lesley
James, Head of Children's Health, Care & Criminal Justice;
Audrey Slater, Head of HR, HSCP; Claire Cusick, Senior
Education Officer – Services for Children & Young People;
Louise Hastings, People & Change Partner; Lorraine Mair,
Organisational Development & Change Lead; Alan Douglas,
Manager of Legal Services; and Scott Kelly, Committee Officer.
Apologies: Apologies for absence were intimated on behalf Councillor
Daniel Lennie; David Scott (GMB); and Sean Davenport and
David Smith (UNISON).
APPOINTMENT OF CHAIR, VICE CHAIR AND JOINT SECRETARIES
The Manager of Legal Services invited the Forum to consider, in terms of its
constitution, a number of appointments for the next year and it was agreed:-
(1) that Councillor David McBride be appointed as the Chair of the Forum;
(2) that David Smith (UNISON) and John Wagner (GMB) be appointed as joint
Vice Chairs; and
(3) that Victoria Rogers, Chief Officer – People & Technology, be appointed as
the Joint Secretary for the Council Side and Chris Rossi be appointed as Joint
Secretary for the Trades Union Side.
Councillor McBride then assumed the Chair.
ITEM 6
Page 13

Page 14

Councillor David McBride in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Joint Consultative Forum held on 16 June 2022 were
submitted and approved as a correct record.
PRESENTATION: STRESS MANAGEMENT FRAMEWORK REVIEW
Louise Hastings, People & Change Partner, gave a presentation on the Stress
Management Framework Review.  The main points covered in the presentation
were:-
• That personal stress remains one of the top three reasons for sickness
absence.
• That the review of the framework was important in order to ensure that a pro-
active approach to work-related stress is in place and that improved data
could help to identify root causes and appropriate early interventions.
• The importance of the employee voice in terms of fair work.
• That a number of focus groups had been completed with employees and
trades union representatives across a range of service areas within the
Council and that the Employee Wellbeing Group was taking forward actions to
improve the experience of employees and managers.
Following discussion, the Forum agreed to note the information contained in the
presentation.
ORGANISATIONAL DEVELOPMENT, CHANGE & DIGITAL (ODC&D) UPDATE
A report was submitted by the Chief Officer – People & Technology providing an
update on:-
(a) progress across the full range of learning and development opportunities for
all employees; and
(b) the introduction of the Digital Skills Support Framework.
Page 14

Page 15

After discussion and having heard the Organisational Development & Change Lead,
the People & Change Partner and the Chief Officer – Citizen, Culture & Facilities in
explanation of the report and in answer to Members’ questions, the Forum agreed to
note the progress made and to continue to support learning and development for all
employees.
Note: Mr Halfpenny entered the meeting during consideration of this item.
ANNUAL MONITORING REPORT – EMPLOYMENT EQUALITIES
A report was submitted by the Chief Officer – People & Technology advising of
employment equalities matters for the year 2021/22.
After discussion and having heard the Strategic People & Change Manager and the
Head of HR, HSCP, in explanation of the report and in answer to Members’
questions, the Forum agreed to note the contents of the report.
TRADES UNION ISSUES
Dignity and Respect Policy (item requested by Joint Trades Union)
Having heard Ms Wood, it was noted that the trades union and HR officers continued
to be in discussion in relation to this matter and that consequently it would not be
raised at the present meeting.
Length of Time Taken for Investigations (item requested by Joint Trades Union)
Following discussion, the Forum agreed:-
(1) to note the concerns expressed in relation to the length of time taken for
investigations to conclude;
(2) to note that delays could arise for a number of reasons including employees,
managers or trades union representatives being unwell, on leave or otherwise
unavailable; and
(3) to note that there was no trend which could determine a consistent reason for
delays but that statistics would continue to be monitored and reported bi-
annually to the Forum, and that a report was due to be submitted to the next
meeting.
Early Years (item requested by Joint Trades Union)
The Forum heard from Ms Wood who advised that concerns had been raised by
Early Years employees in relation to the Early Years action plan and that a mass
meeting had been scheduled in order that the matter could be discussed further.
Page 15

Page 16

In response the Chief Education Officer advised that the actions contained in the
plan had been identified following a survey of Early Years employees and that she
would be happy to receive further feedback from them and to continue to meet with
Ms Wood and other trades union representatives to develop solutions to the
employees’ concerns. 
Care in the Third Sector (item requested by Joint Trades Union) 
The Forum heard from Ms Wood who expressed concern at the involvement of third
sector organisations in providing residential care and with care sometimes being
provided by agency staff. 
In response the Head of Children's Health, Care & Criminal Justice and the Head of
Mental Health, Learning Disability & Addictions informed the Forum:- 
(a) that it was a matter for individuals to decide for themselves which organisation
would provide their care; and  
(b) that third sector organisations were distinct from private sector ones in being
not-for-profit. 
Following discussion, it was agreed that a briefing note would be provided to
members of the Forum detailing the background to this matter, the choices which are
available to individuals in relation to their care, and the services which are provided
by the Health & Social Care Partnership. 
Social Work (item requested by Joint Trades Union) 
The Forum heard from Ms Wood who advised that employees in the Children &
Families service had expressed concerns in relation to the availability of suitable
venues to accommodate supervised family contact. 
In response the Head of Children's Health, Care & Criminal Justice advised the
Forum:- 
(a) that she had met with trades union colleagues to discuss this matter and that
a briefing paper had been provided to them; 
(b) that a result of the pandemic there were fewer suitable venues and that
contact opportunities were limited; and 
(c) that three consultation meetings had been arranged with employees to
discuss the matter further and that it was hoped that agreement on a way
forward would be reached soon. 
Page 16

Page 17

Violence Against Staff in Schools (item requested by EIS) 
The Forum heard from Mr Dolan who raised concerns in relation to: (i) an increase in
violent incidents in schools; (ii) the system in place for reporting such incidents being
cumbersome; (iii) the system for teacher/pupil contact through the internet not having
a secure firewall; and (iv) offending pupils not being removed from their school. 
Mr Dolan requested that consideration be given to: (i) an increase in resources to
tackle the issue; (ii) an increase in the number of available Additional Support Needs
places in schools; (iii) a bespoke system being introduced for reporting violent
incidents in schools; (iv) an improved policy of supporting employees who feel
threatened; and (v) a technical review of the online system of contact between
teachers and pupils to ensure that inappropriate material cannot be passed via the
system. 
In response the Chief Education Officer stated:- 
(1) that officers would continue to discuss with the trades union possible changes
to the system for reporting violent incidents; 
(2) that she understood that there had only been one incident relating to
inappropriate material having been passed from a pupil to a teacher via the
internet but that she would provide an update to Mr Dolan on the firewall at
their next meeting; 
(3) that officers took seriously the reports of employees feeling frightened or
threatened; 
(4) that the Council had an obligation to provide education to pupils in the local
authority area and that action was being taken to seek more Additional
Support Needs places in view of there being more pupils who experience
difficulties with communication; and 
(5) that a draft action plan to address the issues raised by Mr Dolan had been
developed and a copy provided to him, and that she would welcome his
feedback in advance of the their next meeting. 
Following discussion and having heard the Chief Education Officer and the Senior
Education Officer – Services for Children & Young People in answer to Members’
questions, the Forum noted the position in respect of this matter, and that officers
and the trades union would work together to improve the situation. 
Having heard the Manager of Legal Services, the Forum noted that it would be
helpful if, when intimating agenda items in the future, the trades union could include
more detail of the issue they wished to raise at the meeting and the actions they
would like to be considered, in order that officers could be in a better position to
respond to the issues at the meeting. 
Page 17

Page 18

PROGRAMME OF FUTURE MEETINGS 
The Forum agreed:- 
(1) that its future meetings should be held as face to face meetings; and 
(2) the undernoted dates, times and venues for future meetings:- 
• Thursday, 1 December 2022 at 2.00 p.m. in the Council Chambers,
Clydebank Town Hall.
• Thursday, 16 March 2023 at 2.00 p.m. in the Civic Space, 16 Church
Street, Dumbarton.
• Thursday, 8 June 2023 at 2.00 p.m. in the Council Chambers,
Clydebank Town Hall.
• Thursday, 7 September 2023 at 2.00 p.m. in the Civic Space, 16
Church Street, Dumbarton. 
The meeting closed at 4.20 p.m.
Page 18

Page 19

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Citizen, Culture and Facilities
Corporate Services Committee : 2 November 2022
Subject: Citizen, Culture and Facilities Delivery Plan 2022/23
1 Purpose
1.1 The purpose of this report is to provide members with the Citizen, Culture and
Facilities Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Citizen, Culture and Facilities
Delivery Plan is one of eight. 
3.3 The implementation of the Plan will be monitored by the management team
with interim progress reported to Corporate Services Committee in February
2023 and year-end progress in May 2023.
4 Main Issues
4.1 The Citizen, Culture and Facilities 2022/23 Delivery Plan is included at
Appendix 1. This sets out the achievements and challenges over the past
year, as well as the priorities for 2022/23.
4.2  Key priorities for 2022/23 include:
• develop the Council’s Strategic Plan 2022-2027;
• undertake review and design of strategic performance reporting;
• progress plans for launch of free school meal rollout;
• support integration of payment and cashless software in schools;
ITEM 8
Page 19

Page 20

• review structure of Facilities Management;
• progress the development of Glencairn House;
• develop a heritage strategy focussed on wellbeing;
• progress digitalision of materials from Council’s historic archive;
• complete capital projects in libraries and museums;
• review Town Hall arrangements;
• implement complaints management process enhancements;
• explore enhanced telephony technology solutions;
• implement the Fit for Future Actions for Contact Centre and online
• develop Strategic Communications Strategy and communications
campaign road map;
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Citizen, Culture and Facilities,
may have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Amanda Graham
Page 20

Page 21

Service Area:  Citizen, Culture and Facilities
Date:   30 September 2022
_____________________________________________________________
Person to Contact:  Karen Connelly
Performance & Strategy Business Partner
karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: Citizen, Culture and Facilities Delivery Plan
2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 21

Page 22

Page 22

Page 23

2022/23
CITIZEN, CULTURE
AND FACILITIES
Appendix 1
Page 23

Page 24

Contents
1. Introduction ............................................................................................................................................................................3
2. Performance Review .............................................................................................................................................................3
3. Strategic Assessment ............................................................................................................................................................6
4. Resources ........................................................................................................................................................................... 12
Appendix 1: Action Plan ................................................................................................................................................................. 15
Page 24

Page 25

1. Introduction
Citizen, Culture and Facilities comprises a wide range of services covering Citizen Services, Communications, Facilities Management, Libraries
and Cultural Services and Performance and Strategy. It is one of eight strategic areas responsible for delivering the Council’s Strategic Plan.
Key actions to help achieve this are set out in this Delivery Plan, together with actions to address any performance challenges and service
priorities identified in the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services Committee twice yearly,
at mid-year and year-end.
2. Performance Review
The Citizen, Culture and Facilities management team completed a detailed review of 2021/22 performance, focussing on the following
• 2021/22 Delivery Plan year end progress;
• 2021/22 Quality Standards year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints;
• Continuous Improvement (Fit for Future reviews)
• Other benchmarking/feedback
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are summarised below.
Key Achievements in 2021/22 
Listed below are some of the major achievements in each service area despite the unprecedented challenges the Covid-19 pandemic has
created including responding to restrictions and additional duties in identifying new ways of delivering services. All services achieve many other
key outcomes for the Council and its residents throughout the year which are not recorded here but are as important.
Citizen, Libraries and Digital Services
Page 25

Page 26

Successfully managed and processed 2106 self-Isolation support grants totalling £1,053,000. 
Successful funding applications for almost £60k to develop projects around Sustainability and Disengaged Learners.
Major refurbishment of Alexandria Library, including significant upgrades to Adult and Children’s library spaces.
Strategic Communications, Culture & Performance
• Delivered strategic communications support and advice, providing 24-7 media management to protect the Council’s reputation and continued
to expand the reach of the Council’s social media channels increasing the audience to over 40,000 and growing engagement across our
platforms to 640,000,
• Staged the first virtual employee recognition event online to ensure employees’ contributions and efforts were highlighted and they continued
to feel valued.
• Generated additional income for the Council through Performance, Strategic Planning and Equalities support to external organisations.
• Supported the strategic management team with provision of data and performance information during the pandemic including, national and
local data, performance information and support with Equality Impact Assessments for reopening of services.
• Achieved external funding target for the redevelopment of Glencairn House as part of the successful bid to the UK Government’s Levelling
Up Fund. This project will see the transformation of the oldest building on Dumbarton High Street, developing new library space and bringing
new focus to the Council’s historic museum and archive collections.
• Took forward plans to deliver a new museum space in Clydebank Library; a new museum space in Alexandria Library and enhance displays
within Clydebank Town Hall.
Facilities Management
• Achievement of the Soil Association’s independent and nationally recognised Food for Life Bronze Award Served Here for the Primary
School and Early Years meals service.
• Successfully rolled out provision of free school meals to all Primary 4 & 5 pupils in line with the Scottish Government initiative, resulting in all
pupils from P1- P5 now being offered free school lunches
• Supported enhanced cleaning arrangements across Council buildings and education facilities during the Covid-19 pandemic.
Key Challenges from 2021/22
Page 26

Page 27

• The principle challenge over the last year has continued to be in relation to the Covid-19 pandemic. Challenges faced included adapting to
ever changing legislation and guidance to ensure continued delivery of frontline services and provision of strategic communications.
• Responding to the longer term impact of Covid-19 and particularly in the context of health and wellbeing
• Delays in the capital programme, and in particular building works, impacted on the reopening of Clydebank and Alexandria Libraries and
progress of work across the cultural assets
• Office closures in addition to changing working arrangements and service provision across most frontline services resulted in a wide range of
additional responsibilities including providing increased frontline advice and support through the Contact Centre when other Council services
were not operating as normal.
Citizen, Libraries and Digital Services
• Management of the Isolation Support Grants impacted on service delivery due to the significantly high demand, changing guidance and
qualifying criteria along with challenging processing timelines.
• Management of Complaints has become more complex and time consuming due to pressures of the pandemic and the impact on Council
services and their ability to deliver pre-pandemic levels of performance.
• Considerable reduction in the number of physical visits to Libraries as a result of ongoing Covid-19 restrictions.
• Lack of progress of Employee Training and Engagement Programme due to Covid-19 restrictions making face-to-face training impractical.
• The Cookie Law, requires websites to gain consent to store or retrieve any information on personal devices, this has greatly affected our
Google analytics data making it more difficult to tell how well the website is performing or which pages are working as planned.
• The Accessibility Regulations have resulted in a range of additional responsibilities and resource to ensure both web and intranet content is
compliant.
Communications, Offices & Town Hall & Culture
• In communications, the team focused all efforts on the pandemic response to ensure citizens were aware of impacts on service delivery and
of restrictions as they evolved. In addition significant capacity went into amplifying key national messaging around compliance, FACTS,
testing and vaccinations and promoting to both citizens and employees. This in turn disrupted campaign activity planned during 2021/22.
• The closure of the Town Hall since March 2020 continued to have a significant impact on income with all scheduled events cancelled.
• With physical access to buildings impaired or prevented, the Arts and Heritage team was forced to suspend its exhibitions programme.
Similarly, in person arts development activity could not proceed as planned. In line with the wider sector, where possible activity moved
online.
Page 27

Page 28

Facilities Management
• The pandemic pressures presented significant staffing challenges in the recruitment and training of additional staff required to deliver an
enhanced level of service to our clients.
• The significant Covid Infection / isolation rates at times within WDC resulted in challenging losses of key staff which in turn resulted in
adaptations to service provision.
3. Strategic Assessment
The Citizen, Culture and Facilities management team completed a strategic assessment to determine the major influences on service delivery
and priorities in 2022/23. These are summarised below.
Financial Challenges.
The entire public sector is facing significant financial challenges. The Council is currently faced with an estimated cumulative funding gap in
2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to Covid will continue in 2022/23, and whilst some Covid funding
from the Scottish Government was carried forward for use in 2022/23, it may not be sufficient due to the ongoing unpredictability of the impact of
the pandemic on people’s lives and local businesses. We will continue to monitor the overall financial position of the Council and updates on
estimated future budget gaps will be reported to Elected Members throughout 2022/23. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that, within CCF,
available funding will be reduced over time and we will need to reconfigure how we work and what we do to deliver further efficiencies
Budget Sensitivity Analysis
Within this service, budgets identified as being more susceptible to fluctuations is the Town Hall in respect of rising utility costs and Facilities
Management as a result of pressure on food costs in Catering. The Town Hall is also susceptible to fluctuations depending on levels of income
that are achieved.
Page 28

Page 29

Citizen, Libraries and Digital Services
Telephony Enhancements
The telephony system was upgraded in December 2019 and throughout 2021/22 we will explore further improvements alongside our ICT
colleagues. These improvements will include exploring call recording and call wait time announcements in our contact center environment. We
will also explore the transfer of our Emergency Out of Hours telephone numbers to this new technology. 
Complaints
The coordination of the corporate complaints process will become more challenging due to the work style changes including hybrid office and
home working across all Councils services. Adequate communication channels with key person responsibility in each service will be required to
ensure satisfactory and timely responses and regulatory time lines are adhered to. We will ensure we are a key stakeholder in the corporate
wide programme to adapt processes and procedures to fit with the new work style model.  
Fit for Future Action Plan – Housing Repairs Contact Centre
Following the Fit for Future service review undertaken in June 2021, an action plan is being taken forward which will address the key findings
over a five year period 2021-2026. These include improving and streamlining the customer journey, the website and online forms.
Recommendations raised in relation to systems, process, out of hours service, online platform, staffing including availability of training and
development to support employee wellbeing, are all being addressed in the plan. Some actions were identified for Citizen Services which will be
progressed over 22-23.
Wellbeing Support for Citizens
As society emerges from the pandemic, Libraries will be restarting, renewing and strengthening activities aimed at supporting the social,
economic, physical and mental wellbeing of citizens. With support from external funding, Libraries will embark on a dedicated programme of
wellbeing events and educational support, specifically targeting those learners who have become disengaged through disrupted learning.
Libraries Sustainability
Libraries are a key player in the green economy and with support from external funding will be developing new processes, practices,
programmes and activities which encourage a greater understanding of environmental impact and climate change. A funded post will lead on the
actions and engage with internal and external stakeholders, as well as citizens to foster more sustainable practices.
Page 29

Page 30

Digital Technology
Accessibility regulations mean public sector organisations have a legal duty to ensure their websites and mobile applications meet accessibility
requirements. In 2021/22 we concentrated on the internet to make sure this was accessible for all of our citizens. In 2022/23 we will continually
test accessibility of the internet but concentrate on getting the intranet to the same standard. We will optimise content; work with service areas to
make sure their content is accessible, ensure new features are accessible and continue to remove pdfs, posters and leaflets that are not
accessible and do not meet these regulations. In addition to this we will work with the digital online forms group to make the process as customer
friendly and streamlined as possible for citizens and employees. 
Strategic Communications, Culture & Performance
Communications Strategy 
A new Communications Strategy will be developed and presented to align with the new Strategic Plan for period 2022-27. A communication
strategy enables effective communication with and between employees and meet core organisational objectives. It sets out how we will engage
with colleagues, citizens and partners. It ensures that everyone involved has adequate information to communicate the Council’s key messages,
maintaining consistency in the workplace and preventing any ambiguity. This will supersede the current 2017-22 communications strategy. 
Campaign Activity Roadmap
From both a national and a Council wide perspective there are a number of key initiatives across a number of frontline services that will require
formal communication campaigns to ensure the objectives are met, the target audience is reached and the key messages are provided
effectively. The Campaign Roadmap will be developed to support activity and ensure alignment with the strategic plan.
Communication support for new Administration
Support the new Council elected at the Local Government Elections in May 2022. This includes developing and delivering a suite of Elected
Members information/ awareness sessions to reflect any changes introduced with the new Administration and providing formal training as
required.
Glencairn House (Strathleven Place)
Having achieved external funding to support the redevelopment of Glencairn House as a combined museum/library facility via WDC’s successful
Levelling Up Fund bid, work is underway to progress this project. A design concept has been delivered and detailed designs are now in
development. A programme of community engagement will be undertaken to help inform the developed building design, as well as engage
citizens with storytelling linked to Dumbarton’s history and heritage. 
Page 30

Page 31

Clydebank Museum – Library 
A new museum for Clydebank in the basement of the town’s library is under development and, despite being impacted by the Covid-19
pandemic, the project is expected to complete by end 2022. Delivery of this project will create an engaging new heritage offer for both citizens
and visitors from beyond the local area, highlighting the rich history of Clydebank.
Alexandria Museum
The creation of a new museum space, alongside a new multi-use space for the benefit of the local community within the first floor of Alexandria
Library was impacted by the Covid-19 pandemic and compounded by the challenge of undertaking structural works in a historic building. A new
lift has been installed in the building, enabling level access to the upper floor for the first time and the project is anticipated to complete at the
end of the summer. The new museum will explore the history of Alexandria and the Vale of Leven, and will be launched alongside a National
Lottery Heritage Fund enabled project to deliver a programme of inspiring and creative activity to engage the community and celebrate the
Vale’s unique heritage. 
Dalmuir Gallery
In August 2021 the Cultural Committee approved investment of £541k as part of a project to transform Dalmuir Library, with the aim of creating a
cultural venue in the heart of Dalmuir. It is anticipated that work to progress the detailed design for this project will commence during 2022/23,
with delivery of this new cultural asset expected by end 2024. 
Heritage Strategy 
The Arts and Heritage team is progressing delivery of a new Heritage Strategy during 2022 that focuses on how culture and heritage can support
the wider priorities associated with recovery from the Covid 19 pandemic, and in particular helping to improve the health and wellbeing of West
Dunbartonshire’s citizens. This draft heritage strategy will align to the new Council Strategic Plan 2022/27 and will launch during 2022-23. 
Digitisation Programme 
In September 2019 the Cultural Committee approved a revenue generating project to digitise materials from West Dunbartonshire Council’s
historic archive and local history collections. Although the tendering process for this project was impacted by the Covid 19 pandemic, a contract
has now been awarded. The process of digitising these historic records will commence during 2022, enabling wider access to records for
research purposes as well as crucially helping to preserve these historic documents. Ultimately, this project will enable remote searches of these
records globally via a subscription genealogy research website, generating important revenue for the Arts and Heritage service. 
Page 31

Page 32

Clydebank Town Hall redevelopment project and future approach 
In January 2020 the Cultural Committee approved a spend of £0.95m on improving Clydebank Town Hall. A number of changes were made to
the scope and details of the works most notably a move from developing a purpose built museum and gallery capable of hosting major
exhibitions to a space which can stage inhouse exhibitions on a short term basis. Post Covid, the focus is on successful delivery of pre-booked
events planned throughout 2022 and working to reestablish bookings and programming for 2023 and future years. 
Strategic Plan - 2022-2027
In line with the Council’s approach to strategic planning, work will begin in 2022/23 with key stakeholders including the new administration to
develop the new Strategic Plan which will set the vision and direction for Council services over the next five years. The new Strategic Plan will
inform the delivery of Council services and provide a context for decision-making at a service level.
Strategic Performance Framework
In line with the Council’s Strategic Plan, work will being to review our current reporting mechanisms to ensure we are able to identify early any
improvements and ensure we are meeting our statutory obligation to Public Performance Reporting. The Strategic Framework 2022-27 brings
together the statutory and best practice requirements on the Council approach to performance reporting and scrutiny. Good performance
reporting enables the Council to ensure strategic priorities are being met and best value delivered and allows residents to see how we are
performing.
Facilities Management
Improvement Plan – Facilities Management
A review of the FM management structure will be undertaken to respond to recent Scottish Government policy changes and resultant service
expansion, provide additional support for frontline employees and ultimately deliver a more efficient and sustainable service aligned to delivering
the requirements of FM.
Scottish Government – Free School Meal Rollout 
Following the successful rollout of free school meals for pupils in primaries 4 and 5 in August 2021 and Jan 2022 respectively, plans are ongoing
to accommodate the final phase of the rollout to P6 and P7 pupils. This was scheduled for August 2022 however the Scottish Government has
paused the rollout pending detailed examination of the cost requirements for some Councils. During 2022/23 FM will continue with the remaining
Page 32

Page 33

kitchen upgrade works and equipment purchases in preparation for recommencement of the rollout once a revised implementation date is
announced by Scottish Government. The final tranche of additional catering staff will be recruited once revised implementation dates are known.
Integration with Educational Services’ new Automated Payment & Cashless Catering Software 
Facilities Management is working with colleagues from Educational Services in supporting the specification of requirements and evaluation of a
new system for Automated Payments /Cashless Catering, kitchen management information and nutritional analysis package. The work is being
led and financed by Education however there are several components of the system which will be utilised by catering staff and it is therefore
important that these meet FM requirements.  The Food and Nutrition Co-ordinator has been involved to date and will continue to work with
Education colleagues to determine the optimum system. Evaluation/Options Appraisal will take place during 2022 with the new system being in
place before the end of the financial year.
Council Wide
Climate Change Strategy 
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2022/23 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across Council
policies, operations and the wider public. Progress against the actions assigned to CCF will be monitored.
Continuous Improvement
To support continuous improvement, the Council has an established programme of Fit for Future service reviews. Using a range of tools,
information is gathered and reviewed to identify improvements and to ensure our services are efficient and that we make best use of our
resources. During 2022/23 we will continually assess the performance of the services within CCF with a view to determining if any services
would benefit from a Fit for Future service review. Facilities Management will participate in the programme in 2022/23.
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Citizen, Culture and Facilities priorities for
2022/23. Appendix 1 sets out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions to address workforce issues identified in the planning process; and
Page 33

Page 34

• strategic and/or service risks, including those relating to the pandemic.
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership; while service risks relate to service delivery and represent the potential for impact on
individual services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service
users and clients in receipt of the services provided. In identifying the relevant risks for 2022/23 and actions to mitigate them, the aim is to
improve or maintain the current position (i.e. the current risk score) set out in the appendix.
4. Resources
Finance
Citizen, Culture and Facilities has a net revenue budget of £17.88m and a capital budget of £3.345m in 2022/23. A breakdown by service area is
set out below. We will make the best use of the resources available to deliver on key priority areas and secure external/match funding where this
is possible.
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£m)
Performance & Strategy 0.3567 0.0000 0.3567 0.000
Communications and Marketing 0.3545 -0.0217 0.3328 0.000
Citizen Service 1.2850 0.0000 1.2850 0.000
Libraries 1.8365 -0.0250 1.8115 1.635
Arts and Heritage 0.4394 -0.0689 0.3705 1.67
Clydebank Town Hall 0.5115 -0.0530 0.4585 0.000
Office Accommodation 1.4753 -0.2000 1.2753 0.000
Facilities Management 0.4164 -0.0200 0.3964 0.000
Page 34

Page 35

Leisure Management 4.3321 -0.7585 3.5736 0.04
Building Cleaning 1.9925 -0.2891 1.7034 0.000
Building Cleaning - PPP 0.7458 -1.0769 -0.3311 0.000
Facilities Assistants 2.1705 -0.0706 2.0999 0.000
Events 0.1759 -0.0871 0.0888 0.000
Catering Services 5.7632 -1.3089 4.4542 0.000
Total 21.8553 -3.9797 17.8756 3.3450
Employees
Employee Numbers
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows:
Absence in 2021/22
Service Area Headcount FTE
Comms Events & Engage (Including Town Hall) 15 14.78
Customer Services 48 45.59
Facilities Management 570 346.76
Libraries & Culture 57 41.92
Strat Org Pol & Perform 5 4.82
TOTAL 695 450.88
Page 35

Page 36

The quarterly absence statistics for Citizen, Culture and Facilities are shown below together with the Council average for the same periods for
comparison. The figures have been lower that the Council average throughout 2021/22:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Citizen, Culture and
Facilities 
2.93 2.93 4.36 5.33 13.81
COUNCIL WIDE TOTAL 3.27 3.58 4.5 5.03 14.55
Page 36

Page 37

Appendix 1: Action Plan
1. Our Communities
Objective 2. Our residents health and wellbeing remains a priority
Performance Indicator Owner
Number of attendances per 1,000 population for indoor sports and leisure facilities John Anderson
% of pupil medical dietary requests met Amanda Graham
Action Due Date Owner
Progress plans for launch of Free school meal rollout (final phase) 31-Mar-2023 Amanda Graham
Objective 3. Our residents are supported to increase life and learning skills
Performance Indicator Owner
Total number of visits to funded and part funded museums and heritage centres (in person & virtual) per 1,000 population Sarah Christie
Total number of library visits (physical and virtual) per 1,000 population David Main
Cost per visit to libraries David Main
Page 37

Page 38

Performance Indicator Owner
Cost per museum visit £ Sarah Christie
% of adults satisfied with libraries David Main
% of adults satisfied with museums and galleries Sarah Christie
Action Due Date Owner
Progress the development of Glencairn House as an inspiring cultural hub Phase 3 31-Mar-2023 Sarah Christie
Develop and launch an innovative heritage strategy, reflecting the investment in the cultural offering for the
area 31-Mar-2023 Sarah Christie
Progress digitalision of materials from Councils historic archive and history collections 31-Mar-2023 Sarah Christie
Progress investment projects in Alexandria library, Clydebank museum and Dalmuir gallery 31-Mar-2023 Sarah Christie
Progress Libraries Investment and Enhancement Programme 31-Mar-2023 David Main
Successfully deliver the £421k capital investment across the branch network and finalise the branding
improvements at all branches. 31-Mar-2023 David Main
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Page 38

Page 39

Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce. 31-Mar-2023 Amanda Graham
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce. 31-Mar-2023 Amanda Graham
Implement service review process including role design, use of new technology and new ways of working  to
add resilience, address gaps,  and establish opportunities for efficiencies 31-Mar-2023 Amanda Graham
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce. 31-Mar-2023 Amanda Graham
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Owner
Percentage of complaints received by the Council that are resolved at Stage 1 Stephen Daly
Percentage of complaints received by the Council that are resolved at Stage 2 Stephen Daly
% of telephone calls answered within 2 minutes by Contact Centre as a proportion of all calls answered. Stephen Daly
% of telephone calls answered within 2 minutes by Repairs Contact Centre as a proportion of all calls answered. Stephen Daly
No. of transactions undertaken online Stephen Daly
Action Due Date Owner
Implement required complaints management process enhancements 31-Mar-2023 Stephen Daly
Explore enhanced telephony technology solutions 31-Mar-2023 Stephen Daly
Implement the Fit for Future Actions for Contact Centre and On-line from Housing Repairs Report – Phase 1 31-Mar-2023 Stephen Daly
Page 39

Page 40

Action Due Date Owner
Further Review Town Hall arrangements 31-Mar-2023 Amanda Graham
Review structure of Facilities Management Service 31-Mar-2023 Amanda Graham
Support progress of integration of payment and cashless software 31-Mar-2023 Amanda Graham
Undertake planning and preparation of new Council  Strategic Plan  2022-2027 31-Mar-2023 Amanda Graham
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Risk of Failure to meet
citizen expectation
and service standards
Risk of citizen dissatisfaction due to us not doing
what we say we will when we say we will. 29-Sep-2022 Amanda Graham
Failure to effectively
manage and learn
from complaints
There is a risk of damage to the Council's
reputation. If complaints are not handled
effectively, there can be an adverse effect on
the public perception of the Council which can
lead to a lack of trust in the services provided.
29-Sep-2022 Stephen Daly
Objective 12. Our residents are engaged and empowered
Performance Indicator Owner
Percentage of residents who are satisfied with the Council website Stephen Daly
% of press enquiries  responded to within deadline as a proportion of all press enquiries Amanda Graham
% of stage 1 complaints responded to within 5 working days. Stephen Daly
Page 40

Page 41

Performance Indicator Owner
% of stage 2 complaints responded to within 20 working days. Stephen Daly
No. of transactions undertaken online Stephen Daly
% of residents who feel the Council communicates well with them Amanda Graham
Residents satisfaction with Council services overall Amanda Graham
Percentage of citizens who agree the Council listens to community views when designing and delivering services Amanda Graham
Action Due Date Owner
Enhance intranet content and ensure compliance with accessibility 31-Mar-2023 Stephen Daly
Develop Strategic Communications Strategy 31-Mar-2023 Amanda Graham
Prepare and implement a communications campaign road map 31-Mar-2023 Amanda Graham
Undertake review and design of strategic performance reporting ensuring compliance with statutory
obligations. 31-Mar-2023 Amanda Graham
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Risk of Ineffective
Communications /
Reputation Risk
Ineffective use of corporate communication
channels may result in messages that are
inconsistent with authorised responsibilities or
established performance measures. Employees
without intranet access or email access may not
receive communications. Not effectively
managing corporate responses to adverse
events may lead to an erosion of the Council's
reputation.
29-Sep-2022 Amanda Graham
Page 41

Page 42

Page 42

Page 43

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People and Technology
Corporate Services Committee : 2 November 2022
Subject: People and Technology Delivery Plan 2022/23
1 Purpose
1.1 The purpose of this report is to provide members with the People and
Technology Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the People and Technology Delivery
Plan is one of eight. 
3.3 The implementation of this Plan will be monitored by the management team
with interim progress reported to Corporate Services Committee in February
2023 and year-end progress in May 2023.
4 Main Issues
4.1 The Plan for 2022/23 is set out at Appendix 1.
Key priorities for 2022/23 include: ICT infrastructure improvements, including
supporting hybrid working, and ensuring cyber security; Digital Transformation
and Continuous Improvement, ensuring services are sustainable, adaptable
and innovative; Sustainable Employment and Organisational Design and
supporting Service and Community Resilience.
5 People Implications
ITEM 9
Page 43

Page 44

5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to People and Technology may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic Delivery Plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The Delivery Plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The Delivery Plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Victoria Rogers 
Service Area: People and Technology 
Date: 30 September 2022
_____________________________________________________________
Person to Contact:  Nicola Docherty 
Nicola.docherty@west-dunbarton.gov.uk
Appendices: Appendix 1: People and Technology Delivery Plan
2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 44

Page 45

2022-23
DELIVERY PLAN
People and Technology
Appendix 1
Page 45

Page 46

Contents
1. Introduction ............................................................................................................................................................................2
2. Performance Review .............................................................................................................................................................2
3. Strategic Assessment ............................................................................................................................................................5
4. Resources .............................................................................................................................................................................9
Appendix 1: Action Plan ................................................................................................................................................................. 11
Page 46

Page 47

1. Introduction
People and Technology comprises a wide range of services covering Strategic HR, Organisational Development & Change and
Digital, ICT, Transactional Services (HR advice, pensions and pay) and Health, Safety and Risk and Organisational Resilience. It
is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan. Key actions to help achieve that are set out in
this Delivery Plan, together with actions to address any performance issues and service priorities identified in the planning
process.
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services
Committee twice yearly, at mid-year and year-end.
2. Performance Review
The management team completed a detailed review of 2021/22 performance, focusing on the following:
• 2021/22 Delivery Plan year end progress;
• 2021/22 Quality Standards year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• Continuous Improvement (Fit for Future reviews);
• ICT Annual Customer Satisfaction Survey;
• National Digital Office programmes;
• Cabinet Office and Scottish Government Security compliance and guidance; and
• Other benchmarking/feedback etc.
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are
summarised below.
Key Achievements 2021/22
Page 47

Page 48

Over the last few years, the People and Technology teams have played a pivotal role in supporting the workforce throughout the
pandemic with Risk Assessments, DSE, Wellbeing, Workforce updates, ICT support, remote access set up, device loans, e-
learning and return to office help and support. It is anticipated that this support will remain in place for the foreseeable future and
that the teams will continue to respond as required. 
People and Change
• Promoted the wellbeing of the workforce with support, regular information and a full suite of wellbeing opportunities.
• Recognised, with a national award, as one of the top ten flexible employers.
• Introduced new leadership development & digital skills programmes.
• Introduced Fit for Future reviews, holistically reviewing services with a people-centred approach, using service design and
identifying both recommendations for improvement and savings.
• Improved visibility and usage of workforce data via the console and working with Digital Office undertaking a data deep dive
and data maturity assessment.
• Created a consistent approach to H&S reporting, a communication plan and improvement within the FIGTREE system.
• Completed Trickle rollout across workforce and committed to promote learning with the Trade Union Learning Agreement.
• Managed the vaccination centres support teams, recruiting approx. 60 Kickstart employees from WDC local area, creating
jobs and experience for young people aged 18-24.
ICT
• Delivered ICT Security training course materials and Cyber Security Awareness sessions for Senior Management Teams and
delivered phishing exercises across organisation as well as implementing a vulnerability scanning tool.
• Delivered ICT installations within Renton Campus and Clydebank Care home and Health Centre, delivered ICT
improvements to Alexandria and Clydebank libraries in conjunction with Asset Management team’s improvement project and
implemented a new virtualisation solution for Valuation Joint Board improving setup and resilience.
• Carried out multiple system upgrades Citrix, VMWare, and removal of Office 2010, progression of the 365 migration project
and continued rollout of MS Teams, delivered new solutions to update ‘off network’ devices which are used for remote
working.
• Network infrastructure improvements including 5Ghz wireless connectivity across organisation; upgraded backup solution;
replaced network distribution layers switches at High Schools and upgraded bandwidth to a number of primary schools and
libraries.
Page 48

Page 49

• Provided an appointment service for users and onsite cluster support during pandemic and Return to Office ICT support,
increased service desk telephone service hours, provided loan laptops and new mobile phones despite worldwide supply
chain issues, and replaced end of life data phones.
• Supported service transformation projects - Cash Receipting upgrade, Fit for Future reviews, Comino Disposal Module
implementation (pending sign off from Information Management team in Regulatory Services) and cloud transition for criminal
justice LSCMI system.
Transactional Support
• Continued to develop enhancements to the Workforce Management System (WMS) solution facilitating increased
functionality to simplify data gathering and reporting for users.  This included a range of upgrades to the system minimising
downtime for users; further Covid-19 data capture e.g. adverse vaccine reaction, Employee Workstyle Status, New Long
Covid Code for Absence Recording; capturing and management of SSSC Counter signatory information; ICT Licences
recording per post
• Implemented electronic timesheets submission within Home Care and Facilities Management saving time both in
transactional teams and service admin teams
• Completed payroll audit on time and processed multiple, multi-year pay awards
• The team has also been successful in developing automations within key process areas which will continue into 2022/23.
Challenges
• Building leadership/digital/specialist skills across the workforce.
• Improve data quality and improve data usage, rules and ethical decision making.
• Maintaining momentum across all areas without further resource/investment.
• Using Trickle to improve and create a more proactive approach to employee engagement/employee voice/Fair work ensuring
our people feel valued and supported.
• Creating a collaborative council wide approach to transformation, using service design and making best use of
people/tools/systems to improve service delivery.
• Managing and mitigating Cyber Security threats in hybrid working environments (on premise/remote) including updating off
network windows devices to ensure they are secure.  Raising user awareness, risk assessments and investigating new and
replacement technologies have helped to manage this challenge and will continue to be required.
Page 49

Page 50

• Deploying new technologies and upgrading existing technologies in a hybrid working environment when dependency is
heightened e.g. upgrades and maintenance of netscaler and citrix environments.
• Supporting home working users in hybrid working environments as unable to connect to WDC off network devices as well as
using an appointment services to deliver cluster support model in corporate and education environments whilst maintaining
the safety of the ICT Team.
• Sourcing ICT hardware with supply chain issues.
• Managing storage growth and backups and encouraging service areas to carry out housekeeping tasks in line with their
retention policies.
• Increased revenue costs as organisations /suppliers move from capital-based license model to revenue funded or when
transitioning to cloud based services e.g. MS licencing and supplier hosting costs.
• Maintaining a range of WMS developments with increased workload pressured combined with challenges presented by
Covid-19.
• Continued technical challenges with Frontier (WMS).
• Development of automations with transactional processes due to technical challenges in how the automation solution
interacts with a range of back office systems.
• Deployment of iConnect – an online solution for submission of pension data to pension office due to technical challenges
with our WMS.
• Processing Pay Award not only due to the late notification but also the nature of the agreement which spanned across two
tax years.
3. Strategic Assessment
The People and Technology management team completed a strategic assessment to determine the major influences on service
delivery and priorities in 2022/23. These are summarised below.
Financial Challenges
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative
funding gap in 2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID will continue in 2022/23,
and whilst there is still some carried forward COVID funding from the Scottish Government available for use in 2022/23, it is
difficult to assess whether it will continue to be sufficient due to the ongoing unpredictability of the impact of the pandemic on
Page 50

Page 51

people’s lives and local businesses.  We will continue to monitor the overall financial position of the Council and updates on
estimated future budget gaps will be reported to Elected Members throughout 2022/23. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that,
within People and Technology, available funding will be reduced and we will need to reconfigure how we work and what we do to
deliver further efficiencies. 
In addition to this, maintaining the Security and Integrity of the Councils systems and data within financial constraints whilst
managing and mitigating Cyber Security threats in a hybrid, on premise/remote working environment, which requires raising user
awareness, undertaking risk assessments and investigating /delivering new and replacement technologies, will remain a priority
for the year ahead. 
Sustainable Employment and Organisational Design
Continuing to ensure employees skillset/development continues to grow and be supported. If not prioritised, recruitment and
retention difficulties may be exacerbated with attendance, well-being and workforce motivation impacted. Skills may not keep
pace with new skills/tools/developments with WDC becoming poorly placed to capitalise/deliver on improvements
Continue to manage council risk and ensure sound Health & Safety practices are embedded. Poor H&S practice creates
significant risk for the council both in financial and reputational damage. Sound H&S practice supports employee engagement
and collaboration with good workforce practices, without this commitment employee engagement will suffer.
Transformation and Continuous Improvement
ICT
Service delivery model arising from COVID-19 will require a review and potential redesign of the Council’s IT infrastructure
architecture.  Managing remote/hybrid technical environments will involve redesign, investment in new and or replacement
technologies as well as upskilling the ICT team.  Some changes have already been implemented and this will continue.  ICT will
review the existing technologies, assess alongside in-flight technology implementations (e.g. 365 implementation) to maximise
the investments made, decommission where possible and streamline the range of technologies ICT need to support and users
need to access.
Page 51

Page 52

Digital Transformation
The Scottish Digital Office conducted a Digital Maturity assessment in 2019 providing a baseline of WDC’s digital approach and
awareness of it across the authority.  This was a positive start for WDC and has helped set the vision for the digital team
focussing on “digital skills” and “making better use of data”.  
To facilitate this, the service needs a joined up approach to supporting digital transformation, growing employee skills and
working with citizens to adapt and change how services are delivered.  To do this structures require to be reviewed and
resources (financial and workforce) need to be identified to ensure plans and processes are in place alongside the ability to
constantly monitor progress on keeping pace with digital transformation and technology.  To support this the Digital
Transformation Board has been widened to allow a more holistic, one council approach to be adopted.  This has created a wider
virtual digital team and ensured focus and resource to be employed and prioritised to ensure delivery of the council’s strategic
aims. 
The speed of technological advancement has been rapidly increasing and will continue to do so. This will impact on employees,
citizens and services as the Council seeks to both capitalise and adapt to these. Additional support and upskilling has been
evident with the rapid deployment of MS Teams and online Committee Meetings. 
In 2022/23 we will continue to build good data practices/structures council wide. Managing and maximising data usage and
improving skills is key to ensure employees and users understand benefits and threats. If this is not continued it increases the
potential for both reputational and financial risks. It will also impact on decisions and understanding on progressing improvement
activity and planning for the same. 
We will also continue to support development of the WMS to aid wider process and digital transformation and continue to
develop automations within transactional processes through collaborative practice, service design and maximising digital
practice, through the Fit for Future programme. Technology is developing quickly and WDC need to ensure that they keep pace
in order to capitalise on the benefits this brings to service improvement, costs and delivery. This must be looked at collaboratively
with users and employees to ensure understanding, best practice and skills required. 
The Council will continue its journey around Robotic Process Automation, which is now starting to be widely considered in a
number of Scottish Local Authorities. We believe this approach complements the wider digital transformation programme and its
three key work streams - Better Use of Data, Digital Skills, and Digital Leadership.
Page 52

Page 53

Service and Community Resilience
The Civil Contingencies Officer has continued to support West Dunbartonshire’s resilience planning, response and recovery
arrangements associated with Covid 19. This includes representing the Council at regional Single Point of Contact (SPOC)
Vaccination Programme meetings, supporting the Council’s Core Vaccination Group (chaired by CO P&T for period 21/22) and
support to the Strategic / Operational Resilience Groups (SRG / ORG). CCS have participated previously in the WDC
Experiential Learning programme (previously on hold due to Covid response) and intend to support this activity, should it be re-
established in 2022-23. Additionally, CCS intends to support arrangements for providing an overview of civil contingencies to
Elected Members, following the 2022 Local Government Elections.
In addition, Service Areas will be encouraged to revisit their system and business continuity requirements for their new ways of
working as adopted during the pandemic.
Budget Sensitivity Analysis
Budget Sensitivity Analysis In reviewing the service budget projections, consideration has been given to sensitivity of these
budgets, in particular for higher risk/ higher value budgets which may have a significant impact on budgetary control and future
budget projections. The analysis has considered sensitivity around demand, costs and charges, and income levels. 
Within this service, no budgets have been identified as being more susceptible to fluctuations however the UK’s exit from the
European Union may impact on the supply costs for goods and services such as IT equipment and associated license and
maintenance costs.
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed People and Technology priorities
for 2022/23. Appendix 1 sets out the action plan to address them, including the relevant risks and the performance indicators and
targets that will enable progress to be monitored and reported to stakeholders. It also incorporates the Strategic workforce
actions as well as the performance indicators that we use to measure and monitor the People and Technology Quality Standards
that help to define what users of our services can expect to receive, and remind both the organisation and our employees of the
challenges and obligations they face in delivering best value services.
The Council has identified risks at both a strategic and service level. Strategic risks represent the potential for the Council to take
advantage of opportunities or fail to meet stated strategic objectives and those that require strategic leadership. Service risks
relate to service delivery and represent the potential for impact on individual services, or the experience of those who work within
the services, i.e. employees, partners, contractors and volunteers or service users and clients in receipt of the services provided.
Page 53

Page 54

In planning for 2022/23, the People and Technology team considered the Council’s strategic risks and identified risks specific to
the service including risks relating to the pandemic. These are set out in the action plan at Appendix 1 alongside actions to
mitigate these, with the aim of improving or maintaining the current position (i.e. the current risk score). 
4. Resources
Finance
People and Technology has a net revenue budget of £7.142m and a capital budget of £1.641m in 2022/23. A breakdown by
service area is set out below. We will make the best use of the resources available to deliver on key priority areas and secure
external/match funding where this is possible.
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£)
Capital Budget
22/23 (£)
Transactional 0.793m -0.074m 0.719m 0.000m
HR & Risk 1.327m 0.000m 1.327m 0.000m
ICT 4.959m -0.430m 4.529m 1.641m
Change & OD 0.621m -0.054m 0.567m 0.000m
Total 7.700m -0.558m 7.142m 1.641m
Employees
Employee Numbers
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows:
Service Area Headcount FTE
Business Support 21 19.29
Health and Safety 7 6.41
Page 54

Page 55

Absence in 2021/22
The quarterly absence statistics for People and Technology are shown below together with the Council average for the same
periods for comparison. The figures for People and Technology have been [lower/higher] that the Council average throughout
2021/22:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Strategic team 1.30 2.61 1.61 1.39 4.27
COUNCIL WIDE TOTAL 3.27 3.58 4.50 5.03 14.55
ICT 52.11 46.90
People and Change 27 26.10
TOTAL 106 98.70
Page 55

Page 56

Appendix 1: Action Plan
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Performance Indicator Owner
Percentage of ICT helpdesk incidents fixed with half day of being logged. James Gallacher
% of our workforce who have declared a disability Alison McBride
% of our workforce who have stated they are LGBT Alison McBride
% of our workforce who are from a Black minority ethnic group Alison McBride
Disability pay gap Alison McBride
The percentage of the highest paid 5% employees who are women Alison McBride
Gender pay gap Alison McBride
Percentage of Council employees who agree or strongly agree that in general, my morale at work is good Alison McBride
% employee attendance improvement rate (teachers & local govt.) Alison McBride
Action Due Date Owner
Page 56

Page 57

Action Due Date Owner
Secure the Council’s Technology Infrastructure 31-Mar-2023 James Gallacher
Enhance Security and Cyber awareness programmes tailored for hybrid working 31-Mar-2023 James Gallacher
Review and implement ICT processes and service improvements  in line with new technologies 31-Mar-2023 James Gallacher
Upskill ICT team in new tools and processes 31-Mar-2023 James Gallacher
Identify and understanding the workforce needs to ensure sound workforce planning activities such as skills
gaps, succession planning and employees are supported throughout their career 31-Mar-2023 Alison McBride
Investigate root cause analysis, employee feedback and data in relation to workforce behaviour and practice
and respond accordingly with improvements. 31-Mar-2023 Alison McBride
Implement the actions from the Equalities Outcome Monitoring Plan 31-Mar-2023 Alison McBride
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce. 31-Mar-2023 Alison McBride
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce. 31-Mar-2023 Alison McBride
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2023 Alison McBride
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce. 31-Mar-2023 Alison McBride
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Page 57

Page 58

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Workforce
Management System
not fit for purpose
There is a risk that the WMS system is not fit-for-
purpose thereby requiring manual workarounds
restricting the level of automation impacting on
efficiencies
28-Sept-2022 Arun Menon
Challenges in
protecting the Health
and Safety of
Employees and
Others
Failure to meet the Council’s duty to protect the
health, safety and welfare of its employees and
other people who might be affected by its
business 
28-Sept-2022 Alison McBride
Complexities in
ensuring an
appropriately
resourced and
resilient workforce
Failure to ensure that there is an appropriately
resourced and resilient workforce in place to
meet future organisational needs, in effectively
executing the Council’s 2022-27 Strategic Plan.
05-Sep-2022 Alison McBride
Threat of Cyber-attack
Data, systems and/or infrastructure are impacted
as result of security attacks which are increasing
in number at a time when this threat is already
placing demands on resources to deliver
increased levels of security controls. 
29- Sept-2022 James Gallacher
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Due Date Owner
Page 58

Page 59

Action Due Date Owner
Implement statutory Payroll changes 31-Mar-2023 Arun Menon
Undertake annual Payroll Audit 21-Dec-2023 Arun Menon
Continue to develop automations around HR & payroll system, sickness absence and pension calculations
and wider council services 31-Mar-2023 Arun Menon
Embed H&S commitments with service delivery and workforce planning. Build and support workforce groups
to promote good practice 31-Mar-2023 Alison McBride
Continue to build on data usage/skills to improve decision making and accountability. Raising user
awareness, risk assessments and investigating technology implications 31-Mar-2023 Alison McBride
Create a collaborative council wide approach to transformation, using service design and making best use of
people/tools/systems to improve service delivery 31-Mar-2023 Alison McBride
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Keeping abreast of
developments in the
innovative use of
Information
Technologies
Failure to keep pace with changing technology
environment 29-Sept-2022 James Gallacher
Page 59

Page 60

Page 60

Page 61

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Regulatory & Regeneration 
Corporate Services Committee : 2 November 2022
Subject: Regulatory & Regeneration Delivery Plan 2022/23
1 Purpose
1.1 The purpose of this report is to provide members with the Regulatory &
Regeneration Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Regulatory & Regeneration
Delivery Plan is one of eight. 
3.3 The implementation of this Plan will be monitored by the management team
with interim progress reported to Corporate Services Committee in February
2023 and year-end progress in May 2023. The economic development
elements of the Plan will also be reported to Infrastructure, Regeneration and
Economic Development Committee.
4 Main Issues
4.1 The Plan for 2022/23 is set out at Appendix 1.
4.2 Key priorities for 2022/23 include: 
• delivering sustainable, quality services within the context of significant
financial challenges;
• delivering key regeneration sites across West Dunbartonshire;
• promoting the next phase of the Queens Quay housing and providing legal
and planning input to the New Affordable Housing Programme;
ITEM 10
Page 61

Page 62

• exploring commercial opportunities in our town centres and wider
regeneration sites;
• supporting town centres to recover following the pandemic;
• implementing the Climate Change Action Plan to support the
implementation of the Climate Change Strategy;
• developing a new Economic Development Strategy and action plan;
• implementing the action plan to set up the new Council following the local
government election in May;
• planning and organising the nomination process for Community Councils
and subsequent elections;
• providing legal services to West Dunbartonshire Energy LLP;
• providing legal advice on the emerging National Care Service;
• training service data ambassadors for the Corporate Data Information
Management System (MAGIC) and evaluating its use;
• implementing the Fit for Future Improvement Plan for Building Standards;
• completing the business case and for IDOX Electronic Document
Management System for Planning & Business Standards;
• implementing the provisions of the Scottish Government’s fourth National
Planning Framework (NPF4) for West Dunbartonshire’s planning policies
and priorities, adopting Local Development Plan 2 (LDP2) and
commencing work on LDP3;
• completing the first phase of the Rediscovering the Antonine Wall Project
and preparing for phase two;
• commencing implementation of the Shaping Places for Wellbeing pilot in
Clydebank; and
• conducting property inspections of host properties identified through the
Super Sponsor Scheme (Homes for Ukraine).
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Regulatory & Regeneration may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
Page 62

Page 63

9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Alan Douglas
Service Area: Regulatory & Regeneration
Date:  5 October 2022
_____________________________________________________________
Person to Contact:  Lynn Henderson
lynn.henderson@west-dunbarton.gov.uk
Appendices: Appendix 1: Regulatory & Regeneration Delivery Plan
2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 63

Page 64

Page 64

Page 65

2022/23
REGULATORY &
REGENERATION
Appendix 1: Regulatory & Regeneration Delivery Plan 2022/23
Appendix 1
Page 65

Page 66

Contents
1. Introduction .................................................................................................................................................................................................... 2
2. Performance Review ...................................................................................................................................................................................... 2
3. Strategic Assessment .................................................................................................................................................................................... 7
4. Resources .................................................................................................................................................................................................... 16
Appendix 1: Action Plan .......................................................................................................................................................................................... 18
Page 66

Page 67

1. Introduction
Regulatory & Regeneration comprises a wide range of services covering legal, trading standards, licensing, records management, planning,
building standards, environmental health, democratic and registration services, and economic development. It is one of 8 strategic areas
responsible for delivering the Council’s Strategic Plan. Key actions to help achieve that are set out in this Delivery Plan, together with actions to
address any performance issues and service priorities identified in the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services Committee twice yearly,
at mid-year and year-end.
2. Performance Review
The management team completed a detailed review of 2021/22 performance, focusing on the following:
• 2021/22 Delivery Plan year end progress;
• 2021/22 Quality Standards year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• 2021/22 Planning Performance Framework;
• 2021/22 Building Standards Performance Report;
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints;
• Continuous Improvement (Fit for Future reviews);
• Other benchmarking/feedback/ etc.
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are summarised below.
Page 67

Page 68

Key Achievements in 2021/22
Listed below are some of the major achievements in each service area that were particularly challenging or unusual.  All services achieve many
other fantastic outcomes for the Council and its residents throughout the year which are not recorded here but are often as important.
Cross Service
• Services across R&R continued to meet the significant challenges posed by the pandemic, delivering services as efficiently and effectively as
possible with limited impact on service users.
• There was strong collaborative working by Regeneration, Planning, Building Standards, Environmental Health and Legal Services on key
regeneration sites.
• The District Heating Network at Queens Quay became fully operational, winning two prestigious awards in its first year:
o District Heating Network at The European Heat Pump Awards, Heat Pump City of the Year category, for the most efficient, smart and
sustainable project of the year; and
o Carbon Reduction Award at the Scottish Green Energy Awards.
• Commenced remediation work at the Exxon site at Bowling and appointed the contractor for the infrastructure works.
• Created the Clydebank Development Framework with Regeneration, Planning and Asset Management to provide a 15 year vision for
Clydebank, with the aim of re-establishing a distinct town centre heart.
• 146 new social housing units were constructed at Queens Quay, which will bring the first of approximately 1,200 households to the waterfront
site by August 2022.
• Entered into a legal agreement with the Malin Group for the initial stages of a major marine development at the former Carless site which will
see millions of pounds of private, Council and Scottish Government monies invested in a Marine Technology Park creating jobs and
economic opportunities.
• Prepared and approved the Alexandria Town Centre Masterplan.
Democratic & Registration Services
• Planned and conducted the Scottish Parliamentary Elections in May 2021, including implementing significant additional measures to ensure a
safe election in the midst of the pandemic and addressing the increase in number of postal voters.
• Delivered a hybrid committee system, enabling formal committee meetings to be conducted successfully in person or at home by elected
members.
Page 68

Page 69

• Planned and delivered a commemorative concert for the 80th anniversary of the Clydebank Blitz in partnership with the Royal Scottish
National Orchestra.
• Safely re-introduced civil ceremonies in the midst of the pandemic.
Legal Services & Trading Standards
• Entered into a new arrangement with Food Standards Scotland to inspect animal feed in three local authority areas.
• The Trading Standards Team, as part of a Society of Trading Standards Scotland initiative, was awarded the Touchstone Award for
Hallmarking for valuable work around counterfeit precious metals.
• Agreed terms with hub West Scotland for the delivery of the new Faifley Campus including oversight of a complex procurement of the main
contractor.
• Contracts & Property delivered the acquisition of the Artizan Centre including 24 tenanted shopping units within a demanding timescale and
undertook the often complex legal work necessary to bring in £2.7 M in capital receipts from Land Disposal.
• Managed court and tribunal cases to successful resolution during the pandemic with new ways of working brought about by significant
changes in the court and tribunal systems.
• Supported licensed businesses through the fast tracking of occasional licence applications and turnaround of permissions to allow outdoor
areas in line with the permissive approach from the Scottish Government.
Planning, Building Standards & Environmental Health
• Building Standards played a proactive role in facilitating the reopening of Cameron House after the tragic fire in 2017 and the opening of the
new Renton Campus under very tight timescales.
• Improved the performance of Planning and Building Standards indicators (details to follow at year end).
• The ‘Rediscovering the Antonine Wall’ Project was recognised on an international level, receiving the Honourable Mention for the European
Archaeological Heritage Prize 2021 and shortlisted as a finalist for an Association for Heritage Interpretation award for the sculpture and
distance stone at Nethercroy.
• Achieved planning decisions and controls on two quarry sites providing mineral provision for next 20 years for the local and wider area.
• Environmental Health worked in close partnership with NHS and Scottish Government partners to establish the first dual testing community
test site in Scotland for symptomatic and asymptomatic COVID-19 cases in Clydebank East in December 2021.
• Appointed a new Public Health Compliance Officer in April 2021 to offer advice, guidance and support to local businesses on COVID-19
compliance matters, with over 280 pro-active COVID-19 inspections taking place.
• Worked in partnership with the Improvement Service and Scottish Government to establish a National Dog Control Notice database.
Page 69

Page 70

Economic Development
• Provided support to 201 new business start-ups and held 37 free business skills webinars for 202 different clients including start-up and
established businesses during a very challenging period.
• Supported businesses by delivering over £31m of COVID-19 grants to over 1,500 businesses over the period of the pandemic.
• Agreed the Climate Change action plan with key services in our drive to net zero.
• Secured £20m UK levelling up funding to transform Dumbarton town centre, including the redevelopment of Glencairn House, the purchase
and regeneration of the Artizan Shopping centre, and the delivery of connections from Dumbarton Central to the Town Centre, all of which
will have a significant impact on Dumbarton and the town centre vibrancy.
Key Challenges in 2021/22
Cross Service
• The loss, recruitment and training of key staff across Regulatory and Regeneration was a particular challenge in 2021/22 when demands on
all services were higher than normal as a result of the pandemic.
• The national skills shortage of qualified and experienced officers in Planning, Environmental Health, Trading Standards, and Building
Standards continued in 2021/22, resulting in reduced staff complements across many services, increased demands on existing and
inexperienced staff, and a high staff turnover. This is a challenge experienced by most local authorities and has resulted in alternative service
delivery models, including the use of agency staff.
Democratic & Registration Services
• The adequate staffing of the Scottish parliament election in May 2021, both at the polls and at the count, was particularly challenging due to
the shortage of experienced staff willing to take the additional COVID risk of working during the election.
Legal Services & Trading Standards
• Due to a national shortage of qualified Trading Standards Officers, the service operated throughout 2021/22 at substantially less than a full
staff complement, requiring Trading Standards to prioritise statutory functions and COVID-19 public protection duties.
• Home working without contact within legal teams increased re-work and missed opportunities for collegiate working.
Planning, Building Standards & Environmental Health
• Guidance re implementation of the Planning (Scotland) Act 2019, including consultation on the draft National Planning Framework 4 and
Local Development Planning Regulations and Guidance, highlighted the additional skills and resources that will be required to implement
these.
Page 70

Page 71

• Issues relating to housing land impacting on the adoption of LDP2 and the Supreme Court challenge of the planning permission issued
through appeal for housing development at Farm Road, Duntocher (Duntiglennan Fields).
• The suspension of programmed food safety inspections from mid-March 2020 until 1 October 2021 resulted in a backlog. With between 70 to
80 inspections due per month, this had a significant impact on Environmental Health staff resources in 2021/22 which will continue in
2022/23.
• The pressures of the pandemic impacted on service delivery, particularly within Environmental Health which assumed a wide range of
additional responsibilities. As well as resuming food safety inspections in October 2021, the service dealt with over 440 COVID related
service requests, including support and advice to over 365 school and early education case notifications from Education colleagues.
• The tragic and sudden death of the Environmental Health Manager in January 2022 placed additional challenges on the service in the last
quarter of 2021/22.
Economic Development
• Delivering private sector homes at Queens Quay was a challenge in 2021/22. We will continue to seek to ensure Queens Quay Housing is
delivered by our commercial partner in the year ahead.
• Securing agreement to connect West College Scotland and the Golden Jubilee Hospital to the District Heating Network has been a
challenge in 2021/22, with continued effort necessary in 2022/23.
• The impact of the pandemic on the business community during 2021/22 was significant and the recovery process in the year ahead will be
supported by Business Gateway’s continued intervention and distribution of the Scottish Government’s COVID-19 grants.
Page 71

Page 72

3. Strategic Assessment
The Regulatory & Regeneration management team completed a strategic assessment to determine the major influences on service delivery and
priorities in 2022/23. The key factors are summarised below.
Key Factors
Financial Challenges
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative funding gap in
2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID will continue in 2022/23, and whilst there is still some
carried forward COVID funding from the Scottish Government available for use in 2022/23, it is difficult to assess whether it will continue to be
sufficient due to the ongoing unpredictability of the impact of the pandemic on people’s lives and local businesses.  We will continue to monitor
the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected Members throughout
2022/23. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that within R&R,
available funding will be reduced over time and we will need to reconfigure how we work, what we do, where we work, and potentially reduce the
number of people employed. In this context, we will aim to continue to provide a sustainable, quality service to internal clients and the public.
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to the sensitivity of these budgets, in particular for higher risk/ higher
value budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity
around demand, costs and charges, and income levels. 
Within this service, budgets which have been identified as being more susceptible to fluctuations include:
• Planning and Building Standards Income - 2022/23 budget £0.85m
• Licensing Income - 2022/23 budget £0.40m
Page 72

Page 73

Income levels have continued to be affected in the current year by the COVID-19 pandemic and in other years by local and national economic
activity and is difficult to project with accuracy due to the income being demand led and whether income will recover to its pre pandemic level.
Deliver Key Regeneration Sites
A number of key regeneration projects will be taken forward in the coming year including:
• the Exxon project, with detailed design works and final business case due to be delivered by November 2022;
• the North Clyde Riverside, an ambitious long term vision to promote the redevelopment of our riverside sites from Clydebank to Dumbarton;
• key actions in the Alexandria Masterplan and Clydebank Development Framework, both of which aim to develop their respective town
centres;
• the Scottish Marine Technology Park (SMTP) at the Carless site in Dalmuir; and
• a range of projects funded through the £20m Levelling Up fund, including the redevelopment of Glencairn House, the purchase and
regeneration of the Artizan Shopping centre, and connecting Dumbarton Central to the Town Centre, all of which will have a significant
impact on Dumbarton and the town centre vibrancy.
Actions: Deliver key regeneration sites across West Dunbartonshire; Ensure regenerations sites are progressed to enable high quality
development to be achieved on the ground; and Monitor the development of the key regeneration sites to ensure they comply with the approved
consent
Queens Quay
Infrastructure works for this 80 acre residential waterfront development were completed in 2020/21. The focus in the year ahead will be securing
housing developments across the site in partnership with site owner Clydeside Regeneration Ltd. The site wide design codes, which set out a
vision for the Clydebank site and ensure all new developments meet the same high standards, are complete and efforts to promote and market
the plots will be critical to ensure the Council’s investment sees economic as well as commercial returns. This continues to be a challenge,
particularly in relation to flatted private homes which the market is finding difficult to make commercially viable. 
Action: Promote the next phase of Queens Quay Housing
Page 73

Page 74

Commercial Opportunities
The regeneration team will seek to identify commercialisation opportunities for new development opportunities in conjunction with the private
sector. We will seek to progress discussions with developers who may wish to enter a partnership with the Council to achieve joint benefits from
a commercial, housing and low carbon perspective. The Regeneration Capital Fund with £12.77m and external funding of £1m will need to be
allocated across a number of projects. The Fund’s key operating principles and allocations to specific projects agreed by Committee will be
progressed.
Projects linked to the Scottish Marine Technology Park (SMTP) at the Carless site and, importantly, the expansion of the District Heating
Network to the Golden Jubilee Hospital and beyond, will be progressed over this period.
Mission Clyde is the Scottish Government’s latest flagship infrastructure approach to Regeneration along the length of the River Clyde. West
Dunbartonshire sits well in term of potential areas for consideration of Mission Clyde funding with sites such as the Exxon project, Carless, the
Golden Jubilee Hospital and Queens Quay already seen as key contributors to Mission Clyde. Officers have secured £2m of external (Scottish
Government) funding for the Carless site in partnership with the Malin group and Cemineral have secured £179k to develop their cement
handling facility at Rothesay Dock in Clydebank. The Council has also committed £2m from the Regeneration Fund to support the development
of the Marine Technology Park.
The UK Government’s Levelling UP funding has enabled the Council to acquire and part demolish the Artizan shopping centre in Dumbarton,
reducing the retail capacity of the town. The regeneration of the shopping centre will provide a reduced source of Council income in the future
with limited retail capacity, however anticipate income from potential new Council tax from housing on the site.
Action: Explore commercial opportunities in our town centres and wider regeneration sites
Supporting Business Recovery
Assisting town centres to recover from the pandemic will continue to be a focus in 2022/23, and we will prioritise support for High Street
businesses. An unexpected benefit of the pandemic is people demanding more from their local areas and town centres, so we will continue to
develop projects to make our town centres attractive places, and take advantage of the Town Centre Fund and Place Based Investment funds
provided by Scottish Government.
Page 74

Page 75

Underpinning the delivery of our Town Centre Recovery Plan and Masterplanning of Towns is the Scottish Government’s policy driver on
creating ‘20 minute neighbourhoods’. The approved Clydebank Development Framework includes the disposal and development of the former
Playdrome site, a transport hub at Clydebank Station, improved connections between the town centre and Queens Quay, with a linear green
park from Canal south to Transport Interchange, and related community-led activity, all as part of a cohesive plan for Clydebank.
Action: Support Town Centre Recovery
Climate Change Strategy and Action Plan
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2022/23 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across council
policies, operations and the wider public. Progress against the plan will be monitored and reported to the senior management team and to
Council on a regular basis.
Action: Co-ordinate, monitor and report the progress of the Council’s Climate Change Action Plan for 2022/23
Economic Development Strategy
A new Economic Development Strategy will be presented to Council in 2022/23 with a vision that ‘By 2025, West Dunbartonshire will have an
inclusive and vibrant economy through the creation of fairer jobs, a drive towards net Zero, and the development of prosperous places in
partnership with our communities and businesses’. The strategy will identify the key strategic priority for the Council in delivering economic
growth and improved wellbeing in our communities. It will also align with the new Strategic Plan for 2022-27, the recent City Region Strategy and
anticipated Scottish Government transformation strategy. This will supersede the current 2015-20 Economic Strategy and a series of actions will
be developed and presented to the IRED committee for approval.
Action: Develop a new Economic Development Strategy and action plan
Page 75

Page 76

Scottish Local Government Elections
The Scottish Local Government elections are held every 5 years with the most recent taking place in May 2022. As well as planning and
conducting the elections as would normally be the case, the elections in May were more challenging due to the additional measures required to
run them safely in the midst of the continuing pandemic.
Action: Plan and conduct the Scottish Local Government Elections
Planning and Setting Up the New Council
We will plan for and set up the new Council which will be elected at the Local Government Elections in May. This may include developing and
agreeing a new committee structure and committee timetables, reviewing and revising standing orders and other governance procedures to
reflect any changes made by the newly formed Administration.
Action: Implement the action plan to set up the new Council
Community Council Elections
Community Councils are elected every 4 years to bring local people together to improve their neighbourhoods. There are places for up to 17
Community Councils in West Dunbartonshire, with elections due to be held in Autumn 2022 following a delay as a result of the pandemic.  We
will plan and organise the nomination process for Community Councils and where necessary hold elections to identify successful candidates.
This will involve training new staff in this process as a result of staff turnover.
Action: Plan and organise the nomination process for Community Councils and where necessary hold elections to identify successful candidates
Legal and Planning Support to the New Affordable Housing Programme
The Council has undertaken an ambitious programme to develop hundreds of new affordable homes for rent by the end of 2022/23.  This
programme will make a significant contribution towards meeting currently unmet housing demand, halt population decline and promote West
Dunbartonshire as a place to live. 
Page 76

Page 77

The programme will continue to be supported by Legal Services in the form of contractual and conveyancing advice and support. Planning will
continue to support the provision of quality affordable housing, adopting a place–based approach through engaging in pre application advice,
with support from the Placemaking Co-ordinator and the Place and Design Panel. 
Action: Provide further legal and planning support in relation to the delivery of the new affordable housing programme
District Heating Network
The District Heating Network provides low carbon heating and cooling solutions to the Queens Quay regeneration site. It aims to significantly
reduce fuel poverty and deprivation within some of the poorer neighbourhoods of West Dunbartonshire and, crucially, contribute to key climate
change targets. As the District Heating Network matures, it is anticipated that new customer and expansion opportunities will arise.
Legal services will negotiate heat supply agreements and network expansion agreements with customers and suppliers as the expansion
progresses.
Action: Provide legal services to West Dunbartonshire Energy LLP in relation to heat supply agreements and network supply contracts
National Care Service
An independent review of adult social care, published in February 2021, recommended the creation of a National Care Service to deliver social
care in Scotland. This was followed by a public consultation by the Scottish Government on creating a more comprehensive community health
and social care service that supports people of all ages. Feedback from the consultation will inform legislation expected to be introduced to
Parliament in summer 2022, with a National Care Service anticipated by 2026. 
Legal Services will provide advice, guidance and support in any arrangements associated with the transition to a national care service.
Action: Provide legal advice, guidance and support on the emerging National Care Service
Corporate Data Information Management System (MAGIC)
The new mapping system that we have implemented takes advantage of rapidly evolving data technology to provide better service
delivery.  Fundamental to the new system is ease of data sharing and that it integrates with other systems and supports mobile and flexible
Page 77

Page 78

working. In order to maximise its use as a corporate resource and fulfil its potential, the Geographical Information System (GIS) officer is working
collaboratively to identify data ambassadors in services that would benefit from the mapping system such as Roads, Waste, Greenspace, HSCP,
Elections, and Education.  
Action: Designate and train service data ambassadors for the Corporate Data Information Management System (MAGIC) system and evaluate
its use
Fit for Future Improvement Plan - Building Standards
Following the Fit for Future service review undertaken in October 2021, an improvement plan is being taken forward which will address the key
findings. These include improving and streamlining the customer journey, the website and online forms. Further refinement of automation and
improving IT systems will be taken forward with the implementation of Enterprise, a performance management tool to improve efficiency and
performance, and the move towards a full IDOX solution for workflow management. Matters raised in relation to staffing vacancies, turnover,
hierarchy, and spans of control, together with the availability of training and development to support employee wellbeing, are all being addressed
in the plan. In addition, a new Planning and Building Standards Service structure to meet future business needs will be taken forward in 2022/23.
Action: Implement the Fit for Future Improvement Plan for Building Standards
Full IDOX Electronic Document Management System
Planning and Building Standards strive to continuously improve service quality and performance and, like most Scottish local authorities, we are
on a digital transformation journey to support this. 
Moving in line with all other 31 local authorities, we are preparing a business case to move from our current system to full IDOX electronic
document management. A recent Fit for Future service review has highlighted that this will streamline our processes, save time and in turn
increase our performance, bring savings and improve customer delivery and satisfaction.
Action: Complete business case and seek Council capital funding for IDOX Electronic Document Management System for Planning & Business
Standards 
Page 78

Page 79

New Development Planning System
The Scottish Government’s fourth National Planning Framework (NPF4) is a long term plan for Scotland that guides spatial development, sets
out national planning policies, designates national developments, and highlights regional spatial priorities. It is currently in development with the
final version due to be submitted to the Scottish Parliament for approval in autumn 2022. This will strongly influence West Dunbartonshire’s
Local Development Plan 3 (LDP3) and Local Place Plans. In 2022/23, we will implement the provisions of NPF4 as they apply to West
Dunbartonshire, adopt Local Development Plan 2 (LFP2) and begin formal work in late 2022 on LDP3.  
Action: Implement the provisions of NPF4 for West Dunbartonshire’s planning policies and priorities, adopt LDP2 and commence work on LDP3
Rediscovering the Antonine Wall
The first of its type, this Project has brought together five local authorities with Historic Environment Scotland to increase awareness,
understanding and engagement with the Antonine Wall World Heritage Site and to better connect communities and visitors to the Wall. It has
been immensely successful in raising the profile of the Wall due to the creation of new and interesting attractions in areas that were harder to
understand and appreciate and had little interpretive content to attract visitors other than those with a particular interest in Roman heritage. The
sculptures, distance stones and play parks in particular, are helping less traditional audiences to actively engage with, explore and understand
the heritage of the Wall and the Roman occupation of Scotland.
The Project is due to be completed by the end of 2022. However, all five local authorities and Historic Environment Scotland have committed to
funding for an additional 2 years beyond 2022. This second phase of the project ‘Re-imaging the Antonine Wall’ will focus on regeneration,
reinterpretation, access, and commercial opportunities and improved visitor offers at key locations. It will also look at properties currently on the
Buildings at Risk Register and focus on targeted development for the 5 Council areas.
Action: Complete the Rediscovering the Antonine Wall Project and start preparation for Phase 2: Re-imaging the Antoine Wall
Shaping Places for Wellbeing Programme
The Shaping Places for Wellbeing Programme is a delivery partnership between the Improvement Service and Public Health Scotland, funded
and supported by the Health Foundation and Scottish Government with the support of COSLA. Clydebank is one of 4 pilot community areas
selected with the ambition of improving wellbeing and reducing inequalities.  Planning and HSCP will work together with a Project Officer from
Page 79

Page 80

the Programme and officers from Public Health Scotland and information derived from the pilot will influence spatial policies, land use, future
projects and funding allocation. 
Action: Commence implementation of the Shaping Places for Wellbeing pilot in Clydebank
Supporting the Homes for Ukraine Scheme
The Homes for Ukraine scheme, set up by the UK government in March 2022, allows hosts to sponsor people fleeing from the conflict by offering
them accommodation. The Scottish Government’s Super Sponsor Scheme, which acts alongside Homes for Ukraine, removes the need for
applicants to be matched to a host before they are permitted to travel to Scotland, with applicants matched via a public sector matching service
upon arrival.
As part of the process, local authorities are required to undertake a number of checks including person checks, identity checks, safe guarding
checks and property inspection checks.  This work is undertaken jointly with a number of Council services, with Environmental Health
responsible for inspecting host properties to ensure they meet minimum safety and habitation standards. Inspections have been carried out on
over 100 properties in the past 6 months, with significant resource implications for the team. This work will continue in 2022/23 as the Scottish
Government launches a new campaign in October 2022 to identify further hosts willing to accommodate refugees. 
Action: Conduct property inspection of host properties identified through the Super Sponsor Scheme (Homes for Ukraine)
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Regulatory & Regeneration priorities for 2022/23.
Appendix 1 sets out the action plan to address them. It also includes:
• performance indicators that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions to address workforce issues identified in the planning process; and
• strategic and/or service risks, including those relating to the pandemic.
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership. Service risks relate to service delivery and represent the potential for impact on individual
services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service users and
clients in receipt of the services provided. In identifying the relevant risks for 22/23 and actions to mitigate them, we aim to improve or maintain
the current position (i.e. the current risk score) set out in the appendix.
Page 80

Page 81

4. Resources
Finance
Regulatory & Regeneration has a net revenue budget of £3.142m and a capital budget of £16.898m in 2022/23. A breakdown by service area is
set out below. We will make the best use of the resources available to deliver on key priority areas and secure external/match funding where this
is possible.
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£)
Democratic & Registration 0.907m -0.119m 0.788m 0.000m
Environmental Health 1.198m -0.407m 0.791m 1.091m
Licensing 0.300m -0.398m -0.097m 0.000m
Legal Services & Trading Standards 1.115m -0.181m 0.934m 0.026m
Building & Planning 1.328m -0.846m 0.482m 0.000m
Economic Development 1.476m -1.231m 0.246m 15.781m
TOTAL 6.324m -3.182m 3.142m 16.898m
Employees
Employee Numbers
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows:
Page 81

Page 82

Absence in 2021/22
The quarterly absence figures for Regulatory & Regeneration are shown below together with the Council average for the same periods for
comparison. The overall figure for R&R was significantly lower that the Council average for 2021/22:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Regulatory 3.14 4.17 2.06 1.67 9.25
COUNCIL WIDE TOTAL 3.27 3.58 4.50 5.03 14.55
Service Area Headcount FTE
Democratic & Registration 35 21.3
Economic Development 21 16.8
Legal Services 22 23.2
Planning and Building 44 42.7
Regulatory Management 3 3.0
TOTAL 125 107.05
Page 82

Page 83

Appendix 1: Action Plan
Our communities
Our residents health and wellbeing remains a priority
Performance Indicator Owner
% of air quality monitoring stations complying with the national objective for nitrogen dioxide  at the nearest building façades
of residential properties , schools, hospitals and care homes (40ug/m3 NO2 ) Mark Walsh
Percentage of highest priority pest control service requests responded to within 2 working days John Stevenson
Percentage of service users (businesses) very satisfied or fairly satisfied with the service they received from environmental
health Eilidh Paton
Percentage of service users (citizens) satisfied or very satisfied with the service they received from environmental health John Stevenson
Percentage of businesses and activities regulated by environmental health who are substantially compliant with legislative
requirements John Stevenson
Food Law: Percentage of food businesses in the highest risk category (1 to 6 monthly inspections by Food & Business
Group) that were inspected on time Eilidh Paton
Food Law: Percentage of food businesses in the high risk category (12 monthly inspections by Food & Business Group) that
were inspected on time Eilidh Paton
Number of reports of bogus/cold callers Annemarie
Clelland
Total annual redress won for consumers by Trading Standards Group (£) Annemarie
Clelland
Action Due Date Owner
Commence implementation of the Shaping Places for Wellbeing pilot in Clydebank 31-Mar-2023 Pamela Clifford
Conduct property inspections of host properties identified through the Super Sponsor Scheme (Homes for
Ukraine) 31-Mar-2023 John Stevenson
Page 83

Page 84

Our Environment
Our local environment is protected, enhanced and valued
Performance Indicator Owner
Air Quality: PM10 Concentration Mark Walsh
Our resources are used in an environmentally sustainable way
Performance Indicator Owner
Tonnage of carbon dioxide emissions from Council operations and assets Adam Armour -
Florence
Action Due Date Owner
Co-ordinate, monitor and report the progress of the Council’s Climate Change Action Plan for 2022/23 31-Mar-2023 Adam Armour -
Florence
Risk Description Current
Assessment
Target
Assessment Owner
Inability to reduce carbon
footprint in line with
targets
The risk that the Council will be unable to achieve net zero
emissions by 2045, both in relation to mitigating carbon
emissions and adapting to the impacts of climate change.
Net zero refers to achieving an overall balance between
emissions produced and emissions taken out of the
atmosphere. This target has been developed in a way that
mirrors the emission reduction trajectory set by the Scottish
Government in light of the Climate Emergency.
Adam Armour-
Florence
Page 84

Page 85

Our neighbourhoods are sustainable and attractive
Performance Indicator Owner
Percentage of private landlord applications administered and processed  within 21 days John Stevenson
Action Due Date Owner
Provide further legal and planning support to the delivery of the new affordable housing programme 31-Mar-2023 Alan Douglas
Promote the next phase of Queens Quay Housing 31-Mar-2023
Pamela Clifford;
Gillian
McNamara
Our Economy
Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Performance Indicator Owner
Number of businesses given advice and assistance to start up through Business Gateway Gillian Scholes
No of business gateway start-ups per 10,000 population Gillian Scholes
Cost of Economic Development & Tourism per 1,000 population Gillian Scholes
Proportion of properties receiving superfast broadband Gillian Scholes
Town Vacancy Rates Alan Williamson
Immediately available employment land as a % of total land allocated for employment purposes Alan Williamson
Action Due Date Owner
Deliver key regeneration sites across West Dunbartonshire 31-Mar-2023 Gillian
McNamara
Explore commercial opportunities in our town centres and wider regeneration sites 31-Mar-2023 Gillian
McNamara
Page 85

Page 86

Action Due Date Owner
Support Town Centre Recovery 31-Mar-2023 Gillian
McNamara
Develop a new Economic Development Strategy and action plan 31-Mar-2023
Gillian
McNamara;
Gillian Scholes
Ensure regeneration sites are progressed to enable high quality development to be achieved on the ground 31-Mar-2023 Pamela Clifford
Monitor the development of the key regeneration sites to ensure they comply with the approved consent 31-Mar-2023 Pamela Clifford
Risk Description Current
Assessment
Target
Assessment Owner
Affordability of the Exxon
City Deal Project
There is a risk that the affordability of delivering the City Deal
Exxon project is beyond the resources being made available
from Glasgow City Region City Deal.
Gillian
McNamara
Failure to deliver Queens
Quay Masterplan
Following completion of Council investment there is a risk
the housing plot sales do not materialise in the next 3-7
years, with implications for the return on investment and the
business case for the District Heating Network. 
Pamela Clifford;
Gillian
McNamara
Inability to meet
demands of Council to
progress regeneration
projects within desired
timescales
The number and complexity of regeneration projects is
putting considerable strain on the resources available which
can be exacerbated by delays out with the control of the
service and when pinch points on different projects occur at
roughly the same time. 
Pamela Clifford;
Alan Douglas;
Gillian
McNamara
Page 86

Page 87

Our Council
Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce 31-Mar-2023 Management
Team
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain the
workforce 31-Mar-2023 Management
Team
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2023 Management
Team
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce 31-Mar-2023 Management
Team
Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Owner
Planning applications (major developments) - average number of weeks to decision Pamela Clifford
Planning applications (householder) - average number of weeks to decision Pamela Clifford
Planning applications (local  development, excluding householder) - average number of weeks to decision Pamela Clifford
Percentage of Environmental Health service requests from citizens first responded to within 2 working days John Stevenson
Percentage of building warrant applications responded to within 20 working days Judi Ferguson
Action Due Date Owner
Provide legal services to West Dunbartonshire Energy LLP in relation to heat supply agreements and network
supply contracts 31-Mar-2023 Alan Douglas
Complete business case and seek Council capital funding for IDOX Electronic Document Management
System for Planning & Business Standards 31-Mar-2023 Pamela Clifford
Page 87

Page 88

Action Due Date Owner
Provide legal advice, guidance and support on the emerging National Care Service 31-Mar-2023 Alan Douglas
Designate and train service data ambassadors for the Corporate Data Information Management system
(MAGIC) and evaluate its use 31-Mar-2023 Pamela Clifford
Implement Fit for Future improvement plan for Building Standards 31-Mar-2023 Pamela Clifford
Complete the Rediscovering the Antonine Wall Project and start preparation for Phase 2: Re-imaging the
Antoine Wall 31-Mar-2023 Pamela Clifford
Implement the provisions of National Planning Framework 4 for West Dunbartonshire’s planning policies and
priorities, adopt LDP 2 and commence work on LDP3 31-Mar-2023 Pamela Clifford
Complete the co-ordination of the refurbishment of civic areas of Clydebank Town Hall 31-Mar-2023 George Hawthorn
Risk Description Current
Assessment
Target
Assessment Owner
Failure  to monitor and
enforce regulatory areas
with public risk
The Council fails to comply with statutory regulatory
duties in respect of environmental health, trading
standards and licensing laws.
Annemarie
Clelland; John
Stevenson;
Michael
McDougal
Income for services
continues to be dramatically
reduced as a result of the
COVID-19 pandemic
Relates to registration, licensing, planning and building
control which have been impacted as a result of the
COVID-19 pandemic. 
Alan Douglas
Failure to adequately
respond to an emergency
situation such as a multiple
fatality workplace accident,
outbreak of food borne
communicable disease, a
There is a national shortage of qualified staff in
Environmental Health, across Scotland. This impacts on
West Dunbartonshire Council. Vacancy levels at WDC
might impact on our ability to respond to emergencies.
John Stevenson
Page 88

Page 89

Risk Description Current
Assessment
Target
Assessment Owner
major public health incident
or pandemic
Inability to recruit
successfully to enable
performance to be
maintained
There is a current issue with recruitment of qualified staff
in various parts of the service.
Pamela Clifford;
John Stevenson
Our residents are engaged and empowered
Performance Indicator Owner
Percentage of Council and Committee minutes produced within 3 clear working days of the meeting Christine
McCaffary
% of committee agendas published within standing order timescales
George
Hawthorn;
Christine
McCaffary
Action Due Date Owner
Plan and conduct the Scottish Local Government Elections in May 2022 31-May-2022 George Hawthorn
Implement the action plan to set up the new Council following the Local Government Elections 31-Mar-2023 George Hawthorn
Plan and organise the nomination process for Community Councils and where necessary hold elections to
identify successful candidates 31-Dec-2022 George Hawthorn
Page 89

Page 90

Page 90

Page 91

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
Corporate Services Committee : 2 November 2022
Subject: Resources Delivery Plan 2022/23
1 Purpose
1.1 The purpose of this report is to provide members with the Resources Delivery
Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Resources Delivery Plan is one
of eight.
3.3 The implementation of this Plan will be monitored by the management team
with interim progress reported to Corporate Services Committee in February
2023 and year-end progress in May 2023.
4 Main Issues
4.1 The Resources Delivery Plan for 2022/23 is set out at Appendix 1.
4.2 Key priorities for 2022/23 include: delivering sustainable, quality services
within the context of significant financial challenges; responding to the change
to the Accounting Code of Practice in relation to leasing; developing and
providing financial services to West Dunbartonshire Energy Limited;
automating appropriate reconciliation processes; supporting key
transformational projects across the Council; reviewing the capital programme
and associated monitoring and reporting processes; addressing the negative
impact of wider economic factors on rent arrears, Council Tax collection and
ITEM 11
Page 91

Page 92

corporate debt; automating Council processes and information provision; and
ensuring compliance with the Code of Good Governance.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Resources may have a direct
impact on the delivery of the Council’s Strategic Plan. It is essential that
remedial action is taken to ensure strategic delivery plans achieve the
commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Laurence Slavin
Service Area: Resources
Date:  5 October 2022
_____________________________________________________________
Person to Contact:  Lynn Henderson
lynn.henderson@west-dunbarton.gov.uk
Appendices:  Appendix 1: Resources Delivery Plan 2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 92

Page 93

2022/23
RESOURCES
Appendix 1: Resources Delivery Plan 2022/23
Appendix 1
Page 93

Page 94

Contents
1. Introduction ........................................................................................................................................................................... 2
2. Performance Review ............................................................................................................................................................. 2
3. Strategic Assessment ........................................................................................................................................................... 5
4. Resources ............................................................................................................................................................................. 9
Appendix 1: Action Plan ................................................................................................................................................................. 11
Page 94

Page 95

1. Introduction
Resources comprises Finance, Business Support and Internal Audit & Fraud. It provides accountancy, treasury management, internal audit and
fraud, and business support services to the Council and external clients including the West Dunbartonshire Leisure Trust, the Valuation Joint
Board, Clydebank Property Company, charities and trusts, Clydebank Municipal Bank, and West Dunbartonshire Energy Ltd. Company. In
addition, it provides direct services to residents of West Dunbartonshire. It is one of 8 strategic areas responsible for delivering the Council’s
Strategic Plan. Key actions to help achieve that are set out in this Delivery Plan, together with actions to address any performance issues and
service priorities identified in the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services Committee twice yearly,
at mid-year and year-end.
2. Performance Review
The Resources management team completed a detailed review of 2021/22 performance, focusing on the following:
• 2021/22 Delivery Plan year-end progress
• 2021/22 Quality Standards year-end progress
• Local Government Benchmarking Framework (LGBF) comparative data
• Complaints
• Benchmarking within the Audit service.
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are summarised below.
Key Achievements in 2021/22
Service Wide
• Managed a smooth transition to a new Chief Officer (appointed January 2022) just prior to the Council setting its 2022/23 revenue and capital
budget.
Page 95

Page 96

Finance
• Completed a number of audited Financial Statements within statutory deadlines, with no qualifications, under very challenging circumstances
due to the pandemic and a material increase in funding streams requiring careful management.
• Developed systems to provide financial support to the District Heating Network, a new subsidiary company of the Council.
• Continued to deliver service and financial returns to public sector bodies with a new streamlined staffing structure.
• Supported transformation projects within the Council, including a number of ad hoc one-off projects, for example, the District Heating
Network, ongoing development of revised costing models and financial reporting within Housing Maintenance Trading Account.
Business Support
• Processed £2m in Free School Meals and hardship payments to families in need throughout the pandemic.
• Processed £0.571m in clothing grants to parents and carers of 4,234 school pupils.
• Processed £2.5m in Discretionary Housing Payments to assist the most vulnerable tenants with housing costs.
• Increased efficiency by developing automation solutions to process Free School Meals, Clothing Grants and Discretionary Housing
payments.
• Supported the processing of Business Grants and a range of rates reliefs for businesses in the council area.
• Improved the efficiency of the creditor payments process through enhanced automation.
Internal Audit & Fraud
• Finalised the 2020/21 annual audit plan and progressed the 2021/22 audit plan.
• Delivered actual savings and re-billings of £286,142 against an annual target of £250,000 through the Corporate Fraud Team.
Key Challenges in 2021/22
Finance
• Reconciling and managing a significant number of additional funding streams (mainly due to COVID and Scottish Government priorities).
• Developing processes to ensure compliance with the new requirements of the Accounting Codes of Practice e.g. significant changes in
accounting for leasing.
Page 96

Page 97

• Achieving delivery of service and national requirements with a new streamlined staffing structure and an extended audit period.
• Providing personal development for staff and service resilience by allocating new roles to a number of the team resulting in a significant
learning curve for many senior officers, whilst continuing to provide a quality service to customers.
Business Support
• Level of rent arrears was aggravated by the impact of COVID.
• Collection of Sundry Debt was greatly impacted by COVID which is being managed in line with the Corporate Debt policy and a range of
flexible measures.
• Managing levels of service delivery with the levels of budget cuts.
• Delivering council wide automations.
• Maintaining corporate administration support service levels throughout the disruption of COVID was challenging, for example, staff absence.
This was over and above accommodating additional requests from services, where increased or additional service provision was required in
response to COVID or other initiatives.
Internal Audit & Fraud
• Completing the 2020/21 and progressing the 2021/22 Audit Plans were hindered by staff illness, turnover, recruitment difficulties as well as
other priorities.
Page 97

Page 98

3. Strategic Assessment
The Resources management team completed a strategic assessment to determine the major influences on service delivery and priorities in
2022/23. The key factors are summarised below.
Key Factors
Financial Challenges
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative funding gap in
2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID will continue in 2022/23, and whilst there is still some
carried forward COVID funding from the Scottish Government available for use in 2022/23, it is difficult to assess whether it will continue to be
sufficient due to the ongoing unpredictability of the impact of the pandemic on people’s lives and local businesses.  We will continue to monitor
the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected Members throughout
2022/23.
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that, within Resources,
available funding will be reduced and we will need to reconfigure how we work and what we do to deliver further efficiencies.
To deliver the Council’s objectives and meet those financial challenges, the Resources management team will implement the actions set out in
the action plan in Appendix 2 under strong financial governance and sustainable budget management.
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to the sensitivity of these budgets, in particular for higher risk/ higher
value budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity
around demand, costs and charges, and income levels.
Within Resources there were no budgets identified as being more susceptible to fluctuations.
Page 98

Page 99

Accounting Code of Practice – Change Regarding Leasing
There has been a change to the Code of Practice on Local Authority Accounting issued by CIPFA (the Chartered Institute of Public Finance &
Accountancy) in relation to leasing, which was due to be in place for 1 April 2022 but has subsequently been delayed until 1 April 2023. Going
forward, this results in a significant change in the way leasing costs are presented within the Financial Statements and costs are presented
within the Treasury Management Strategy. This change requires us to gather and analyse a significant amount of corporate-wide information,
ensure awareness of the changes for both members and officers and change the current processes for both Financial Statements and the
Treasury Strategy.
We will continue to gather and analyse information received to ensure we are prepared for the inclusion in the Financial Statements 2023/24.
Accounts for West Dunbartonshire Energy Limited
The District Heating System provides low carbon heating and cooling solutions to the Queens Quay regeneration site. It aims to significantly
reduce fuel poverty and deprivation within some of the poorer neighbourhoods of West Dunbartonshire and, crucially, contribute to key climate
change targets. West Dunbartonshire Energy Limited, established in 2021, will progress the district heating network at Queens Quay.
Resources requires to develop and provide financial services to the new company. This increases workload on an ongoing basis within current
resources. In 2022/23 we will develop and provide services including the development of a company structure within the ledger system,
reconciliations, Financial Statement preparation, budget preparation and monitoring, VAT returns, ledger control, and invoicing.
Automation of Reconciliations (including VAT)
Reconciliations and VAT processes are carried out manually. This is time consuming and introduces the risk of errors. In order to address this,
work is currently underway to review specific reconciliations and VAT processes for automation where this is appropriate. Longer term this will
reduce manual input and the risk of manual error.
Resource Services Support for Transformational Projects and Future Saving Options
As the Council continues to transform services internally and to the public, the need for financial expertise and input is paramount. Without this,
there is the potential for projections of future costs and income to be inaccurate which could materially affect the Council’s ongoing financial
position. To address this, we will continue to develop our staff to ensure they have the appropriate knowledge to support services and
Page 99

Page 100

transformational projects within the Council and engage closely with services to ensure we have a thorough understanding of the challenges
they face and plan an active role in the progression of transformational projects and the development of saving options.
Review of Capital Programme, Monitoring and Reporting
The Council receives a general capital grant from the Scottish Government each year (approximately £6m). Any spend above this level, not
funded from other grants, is funded from borrowing. Capital spend funded from borrowing results in revenue loan charges until the borrowing is
fully repaid. Therefore any reduction in the capital programme will result in revenue savings over a longer period of time. Furthermore there is
extensive monitoring and reporting of the Capital Programme to Council and Service Committees.  Whilst it is important that robust monitoring is
in place, it needs to be delivered in a way which finds a balance between transparent and effective reporting and not being excessively resource
intensive.  During 2022/23, we will review the current capital programme and the supporting reporting procedures to ensure the programme is
affordable and reporting is efficient and effective.
Increased Corporate Debt
Due to the wider economic factors impacting on the collection of rent, Council Tax and sundry debt, the Council is finding it more difficult to
collect all the money it is owed resulting in increased levels of debt across a range of debt types. This has been exacerbated by the impact of the
COVID pandemic. In 2022/23, we will:
• Review ways of decreasing corporate debt through continued improvements to debt collection processes in relation to sundry, NDR, Council
Tax and rent.
• Continue to review ways to improve rent collection rates in conjunction with Housing and W4U.
Automation of Processes and Information Provision
Staff across the Council are employed in manual processes and information provision, such as processing invoices and updating transactional
spreadsheets. Many such processes can be automated, providing benefits such as faster service delivery, improved quality and greater
flexibility, as well as enabling staff to refocus on more complex and meaningful tasks rather than those that are repetitive and mundane. In
2022/23, we will maximise automation opportunities across the organisation to improve efficiency.
Page 100

Page 101

Code of Good Governance
COVID required changes to governance, risk management and control procedures operating within the Council. In light of this, we will revise the
Code of Good Governance, continue to ensure Council compliance with the Code, report this to Audit Committee and embed it within the Annual
Governance Statement. 
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Resources priorities for 2022/23. Appendix 1 sets
out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders
• strategic workforce actions to address workforce issues identified in the planning process
• strategic and/or service risks, including those relating to the pandemic.
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership. Service risks relate to service delivery and represent the potential for impact on individual
services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service users and
clients in receipt of the services provided. In identifying the relevant risks for 2022/23 and actions to mitigate them, the aim is to improve or
maintain the current position (i.e. the current risk score) set out in the appendix.
Page 101

Page 102

4. Resources
Finance
Resources has a net revenue budget of £5.522m and a capital budget of £0.073m in 2022/23. A breakdown by service area is set out below. We
will make the best use of the resources available to deliver on key priority areas and secure external/match funding where this is possible.
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£m)
Finance 1.653 0.255 1.398 0.073
Audit and Fraud 0.431 0.300 0.131 0.000
Business Support 40.061 38.700 1.360 0.000
Central Administration Support (CAS) 2.646 0.013 2.633 0.000
TOTAL 44.791 39.268 5.522 0.073
Employees
Employee Numbers
The headcount and full time equivalent employees in each service area (as at 31 March 2022) are as follows:
Resources Headcount FTE
Finance 45 38.04
Audit and Fraud 9 7.17
Business Support 185 161.81
TOTAL 239 207.01
Page 102

Page 103

Absence in 2021/22
The quarterly absence statistics for Resources are shown below together with the Council average for the same periods for comparison. The
figures for Resources have been lower than the Council average throughout 2021/22:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Resources 1.90 1.49 1.24 1.40 5.83
COUNCIL WIDE TOTAL 3.27 3.58 4.50 5.03 14.55
Page 103

Page 104

Appendix 1: Action Plan
Our Economy
Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Performance Indicator Owner
Number of invoices paid within 30 calendar days of receipt as a percentage of all invoices paid Stella Kinloch
Our partnerships support economic development to deliver increased prosperity for our area
Performance Indicator Owner
The time for processing applications for new Housing Benefits claims from the date of receipt of the application to the day on
which the claim is decided Ryan Chalmers
The time for processing applications for notifications of changes of circumstances for Housing Benefits from the date of
receipt of the application to the day on which the claim is decided. Ryan Chalmers
Our Council
Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce 31-Mar-2023 Management
Team
Page 104

Page 105

Action Due Date Owner
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain the
workforce 31-Mar-2023 Management
Team
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2023 Management
Team
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce 31-Mar-2023 Management
Team
Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Owner
Value of outstanding sundry debt as a percentage of total that is more than 90 days old from date of invoice Ryan Chalmers
Rent collected as a % of total rent due Ryan Chalmers
Percentage of corporate fraud savings target achieved Andi Priestman
Support services as a % of total gross expenditure Adrian Gray
Cost of collecting council tax per dwelling £ Ryan Chalmers
Percentage of income due from council tax received by the end of the year % Ryan Chalmers
Current tenants' arrears as a percentage of total rent due % Ryan Chalmers
Gross rent arrears (all tenants) as at 31 March each year as a percentage of rent due for the reporting year Ryan Chalmers
Income generated as a % of total revenue budget Gillian McNeilly
Action Due Date Owner
Review ways of decreasing corporate debt through continued improvements to debt collection processes in
relation to sundry, NDR, Council Tax and rent 31-Mar-2023 Ryan Chalmers
Page 105

Page 106

Action Due Date Owner
Review ways to improve rent collection rates in conjunction with Housing and W4U 31-Mar-2023
Ryan Chalmers;
Stefan
Kristmanns
Maximise automation opportunities across the organisation to improve efficiency 31-Mar-2023 Arun Menon
Risk Description Current
Assessment
Target
Assessment Owner
Debt is not recovered
efficiently or effectively,
with inherent risk of
financial loss
The processes deployed in collection of monies owed to the
council are inefficient and ineffective resulting in money not
collected on time or having to be written off
Ryan Chalmers
Increase in the level of
rent arrears due to the
level of Welfare Reform
changes and general
state of economy
The Council sees an increase in its level of rent arrears due
to lower disposable income and national changes to the
national benefits regime and the ongoing economic position
Ryan Chalmers
Our residents are engaged and empowered
Performance Indicator Owner
% of council resources directed by communities
Clare English;
Gillian McNeilly;
Elaine Troup
Page 106

Page 107

Strong financial governance and sustainable budget management (Service Objective)
Performance Indicator Owner
Amount of free reserves as a percentage of the prudential reserve target - HRA Gillian McNeilly
Amount of free reserves as a percentage of the prudential reserve target - General services Gillian McNeilly
Percentage variance to budget projected (General Services budget) Gillian McNeilly
Percentage of Audit Plan completed Andi Priestman
Action Due Date Owner
Revise the Code of Good Governance 31-Mar-2023 Andi Priestman
Ensure continued compliance with the Code of Good Governance during 2022/23 31-Mar-2023 Andi Priestman
Prepare and submit draft Annual Governance Statement for 2021/22 to the Audit Committee 30-Jun-2022 Andi Priestman
Continue to improve and deliver the Assurance Statement for 2021/22 to support the Annual Governance
Statement 30-Jun-2022 Andi Priestman
Complete the Internal Audit & Corporate Fraud Plan 2021/22 and report to Audit Committee as part of the
Annual Assurance Statement 31-Aug-2022 Andi Priestman
Implement the change to the Accounting Code of Practice in relation to leasing 31-Mar-2023 Jackie Nicol-
Thomson
Develop and provide financial services to West Dunbartonshire Energy Limited 31-Mar-2023 Adrian Gray;
Gillian McNeilly
Review reconciliations and VAT processes for automation and implement those identified as appropriate 31-Mar-2023 Gillian McNeilly;
Karen Shannon
Review capital programme, monitoring and reporting 31-Mar-2023 Gillian McNeilly
Review financial arrangements against the CIPFA financial code of practice 30-Sep-2022 Gillian McNeilly
Page 107

Page 108

Risk Description Current
Assessment
Target
Assessment Owner
Failure to provide
assurance of the system
of financial controls
Either Internal Audit or External Audit is unable to provide
assurances on the Council's financial control environment Andi Priestman
Failure to meet statutory
deadlines for external
returns (including
HMRC) and financial
statements
Finance Services failing to meet statutory deadlines resulting
in lost revenue or penalty costs Gillian McNeilly
Financial projections are
significantly incorrect
Financial projections for both capital and revenue are
significantly incorrect for  various reasons – including
unexpected costs – resulting in insufficient reserves being
held
Gillian McNeilly
Significant financial
funding reductions /
limitations from Scottish
Government
It is expected that the Council will be faced with significant
ongoing funding reductions/limited increases from the
Scottish Government settlement. This is based on recent
settlements and ongoing projected population change with
West Dunbartonshire. This coincides with a period where
costs are expected to rise in relation to social care due to an
aging population; inflationary increases with RPI at a level
not seen since 1991; post-COVID-19 ongoing costs; likely
increased cost of borrowing as interest rates increase and
pay award pressures linked to inflation. The ongoing
population decline of West Dunbartonshire versus the
average population for the whole of Scotland leads directly to
funding reductions with marginal impact on service delivery
cost/need. Pay awards and other inflationary pressures are
Gillian McNeilly
Page 108

Page 109

Risk Description Current
Assessment
Target
Assessment Owner
expected to continue to be higher than any settlement
position. Covid-19 introduces a risk in relation to the potential
net cost to the Council versus the ongoing funding support
and/or financial flexibilities provided by the Scottish
Government, though this is anticipated to be fully funded. 
Page 109

Page 110

Page 110

Page 111

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution & Property
Corporate Services Committee : 2 November 2022
Subject: Supply, Distribution & Property Delivery Plan 2022/23
Corporate Procurement Unit
1 Purpose
1.1 The purpose of this report is to provide members with the Corporate
Procurement Unit priorities within the Supply Distribution & Property (SD&P)
Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Supply Distribution & Property
Delivery Plan is one of eight. 
3.3 The implementation of the Corporate Procurement Unit priorities within the
SD&P Delivery Plan will be monitored by the management team with interim
progress reported to Corporate Services Committee in February 2023 and
year-end progress in May 2023.
4 Main Issues
4.1 An extract from the SD&P 2022/23 Delivery Plan is included at Appendix 1.
This sets out the achievements and challenges for Corporate Procurement
Unit over the past year, as well as the priorities for 2022/23.
4.2 They include: Continue to incorporate social benefits in the contract activity;
Implement the Fit for Future Action Plan for Procurement – P2P Phase 1;
ITEM 12
Page 111

Page 112

deliver procurement savings and benefits; and refresh contract and supply
management Policy.   
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to SD&P including Corporate
Procurement Unit, may have a direct impact on the delivery of the Council’s
Strategic Plan. It is essential that remedial action is taken to ensure strategic
delivery plans achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Angela Wilson
Service Area: Supply Distribution & Property
Date:  30 September 2022
_____________________________________________________________
Person to Contact:  Karen Connelly
karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: Corporate Procurement Unit Extract from the
Supply, Distribution & Property Delivery Plan 2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Page 112

Page 113

Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 113

Page 114

Page 114

Page 115

2022/23
SUPPLY,
DISTRIBUTION AND
PROPERTY – 
Corporate Procurement
Unit Extract 
Appendix 1
Page 115

Page 116

Contents
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 5
4. Resources ...................................................................................................................................................................................................... 7
Appendix 1: Action Plan ............................................................................................................................................................................................ 9
Page 116

Page 117

1. Introduction
Supply, Distribution and Property comprises a wide range of services covering Corporate Asset Management, Building Services, Housing Asset
& Investment and the Corporate Procurement Unit (CPU). It is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan.
Key actions to help achieve that are set out in this Delivery Plan, together with actions to address any performance issues and service priorities
identified in the planning process.
The progress of this Plan for will be monitored and managed by the management team and reported to Corporate Services Committee twice
yearly, at mid-year and year-end for Corporate Procurement Unit (CPU). 
2. Performance Review
The Supply, Distribution and Property management team completed a detailed review of 2021/22 performance, focusing on the following:
• 2021/22 Delivery Plan year end progress;
• 2021/22 Quality Standards year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Telephone Survey feedback;
• Complaints;
• Continuous Improvement (Fit for Future reviews)
• Other benchmarking/feedback.
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are summarised below.
Key Achievements in 2021/22 
Listed below are some of the major achievements in each service area. Despite the unprecedented challenges the coronavirus pandemic has
created including restrictions and additional duties, each service within SD&P has found new ways of continuing the delivery of critical front line
services. The service achieved many other outcomes throughout the year which are not recorded here but are as important.
Page 117

Page 118

Corporate Procurement Unit
• Delivered a new 5 year Procurement Strategy.
• Increased the procurement spend compliance to 98% in 2020/2021 and at the first six months of 2021/2022, was also 98%.
• Delivered annual performance procurement savings of £0.732m.
• Increased procurement spend on local enterprises and suppliers who have a presence in West Dunbartonshire to 43.1%.
• Collaborated with partners to make a positive contribution to sustainability through procurement decisions
• Collaborated with partners and suppliers to deliver and increase local social and community benefits.
Key Challenges from 2021/22
Workforce.
• The principle challenge has continued to be in relation to the COVID-19 pandemic. Including adapting to changing legislation and guidance to
ensure continued delivery of front line services and safe working conditions for employees.
• The turnover coupled with the time taken to replace, recruit and train employees across Supply Distribution and Property was a particular
challenge in 2021/22 when demands on all services were higher than normal as a result of the pandemic.
• Exceptionally high levels of sickness/ isolation particularly in Building Services had significant impact on our ability to deliver maintenance
and repairs and projects.
• The national skills shortage of qualified and experienced officers in Building Services, Procurement, and Corporate Asset Management,
resulted in reduced workforce numbers, increased demands on existing teams and a high staff turnover. This has resulted in alternative
service delivery models being introduced.
Corporate Procurement Unit
• Increased scrutiny at both local and national level including funding applications, monitoring and reporting required a significant amount of
management time impacting on service delivery.
Page 118

Page 119

3. Strategic Assessment
The Supply Distribution and Property management team completed a strategic assessment to determine the major influences on service delivery
and priorities in 2022/23. These are summarised below.
Financial Challenges 
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative funding gap in
2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID-19 will continue in 2022/23, and whilst there is still some
carried forward COVID-19 funding from the Scottish Government available for use in 2022/23, it is difficult to assess whether it will continue to be
sufficient due to the ongoing unpredictability of the impact of the pandemic on people’s lives and local businesses.  We will continue to monitor
the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected Members throughout
2022/23. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that, within Supply
Distribution and Property available funding will be reduced and we will need to reconfigure how we work and what we do to deliver further
efficiencies
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. 
Within this service, budgets which have been identified as being more susceptible to fluctuations include:
• Building Materials; 2022/23 budget - £3.5M. Nationally there has been a significant inflation in cost of building supplies and materials as
well as challenges with supply due to increased energy, transport and raw material costs. Higher material costs will be passed onto client
budgets through service recharges and any cost increase will put pressure on client maintenance and investment budgets.
• Labour costs; 2022/23 budget - £20.1M. Nationally there continues to be challenges in recruitment and retention of staff due to a skills
shortage of qualified and experienced officers. This impacts both our workforce and that of sub-contractors.
• Transport fuel costs - 2022/23 budget £750,000. The price of petrol/diesel can fluctuate a great deal based on market prices. Also changes
in working practices to allow for social distancing will affect the costs since now, for example, two vehicles need to be driven to a job whereas
one would have sufficed pre COVID-19. Higher fuel and hire costs will be passed onto client budgets through service recharges and any cost
increase will put pressure on client maintenance and investment budgets.
Page 119

Page 120

• Capital Plan - Nationally there has been a significant inflation in cost of building supplies and materials and in some cases shortfall in
supplies. For some projects this may need to increased costs or slippage in delivery of the capital projects.
Corporate Procurement Unit
CPU – Improvement Plan
Following the Fit for Future service review of Procurement an action plan is being progressed to address key findings over a 3 year period,
2021/2024. This includes streamlining the customer experience, improving on line guidance and forms, improving process and procedural
documents, user training and service engagement together with team resilience and communication. 
Contract Supplier Management Policy 
The refresh of the Contract and Supplier Management Policy will be progressed and aims to ensure that suppliers and Council officers adhere to
their agreed contractual obligations including social benefit delivery.
CPU – Strategy
The Councils Procurement Strategy sets out the vision, objectives and actions to direct procurement activity reflecting national and local policies,
and key focus areas. Progress against these, including delivering savings and benefits continue to be monitored.  
Council Wide Climate Change Strategy 
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2022/23 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across council
policies, operations and the wider public. Progress against the actions assigned to SD&P will be monitored.
Continuous Improvement
To support continuous improvement, the Council has an established programme of Fit for Future service reviews. Using a range of tools, that
encapsulates service design, maturity assessments and employee engagement, information is gathered and reviewed to identify improvements
and to ensure our services are efficient and that we make best use of our resources. During 2022/2023 we will assess the performance of the
services within SD&P with a view to determining if any service would benefit from a Fit for Future service review.  
Page 120

Page 121

Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed SD&P priorities for 2022/2023. Appendix 1 sets
out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions to address workforce issues identified in the planning process; and
• strategic and/or service risks, including those relating to the pandemic.
The Council has identified risks at both a strategic and service level. Strategic risks represent the potential for the Council to take advantage of
opportunities or fail to meet stated strategic objectives and those that require strategic leadership; while service risks relate to service delivery
and represent the potential for impact on individual services, or the experience of those who work within the services, i.e. employees, partners,
contractors and volunteers or service users and clients in receipt of the services provided. In identifying the relevant risks for 2022/2023 and
actions to mitigate them, the aim is to improve or maintain the current position (i.e. the current risk score) set out in the appendix.
4. Resources
Finance
Supply Distribution and Property has a net revenue budget of £2.73m (net income) and a capital budget of £6.20m in 2022/2023. A breakdown
by service area is set out below. We will make the best use of the resources available to deliver on key priority areas and secure external/match
funding where this is possible.
Function Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£m)
Consultancy Services  0.845 (0.235)  0.610 0.000
Corporate Assets  2.628 (4.781) (2.153) 0.000 
Capital Investment Team  0.557 (0.719) (0.162) 2.785
Private Sector Housing Grant  0.525 (0.446)  0.079 0.000 
Corporate Asset Maintenance  4.862 (5.128) (0.266) 3.337
Page 121

Page 122

Housing Asset Maintenance &
Investment  0.494 (0.412)  0.082 0.000 
CPU  0.981 (0.500)  0.481 0.000 
HMTA   18.395 (19.796) (1.401) 0.078
Total   29.287 (32.017) (2.730) 6.200
Employees
Employee Numbers (data to be confirmed)
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows:
Absence in 2021/22
The quarterly absence statistics for Supply Distribution and Property are shown below together with the Council average for the same periods for
comparison. The figures have been higher than the Council average overall in 2021/2022:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Supply, Distribution &
Property
5.4 5.00 4.41 4.56 17.20
COUNCIL WIDE TOTAL 3.27 3.58 4.5 5.03 14.55
Service Area Headcount FTE
Corporate Asset Management 43 36.10
Housing Asset & Investment 10 8.80
Maintenance & Repairs 347 336.12
CPU 19 17.14
TOTAL 419 398.16
Page 122

Page 123

Appendix 1: Action Plan
3. Our Economy
Objective 7. Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Performance Indicator Owner
% of Contract & Supplier Management scorecards delivered where the Supplier at a minimum, meets the Social Benefits
expectations. Annabel Travers
% of procurement spent on local small/medium-sized enterprises and SMEs who have a presence in West Dunbartonshire Annabel Travers
Action Due Date Owner
Continue to incorporate social benefits in the contract activity. 31-Mar-2023 Annabel Travers
4. Our Council
Page 123

Page 124

Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce. 31-Mar-2023 Annabel Travers
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce. 31-Mar-2023 Annabel Travers
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2023 Annabel Travers
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce. 31-Mar-2023 Annabel Travers
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Owner
% of Contract & Supplier Management scorecards delivered where the Supplier at a minimum, meets the Cost expectations. Annabel Travers
% of Contract & Supplier Management scorecards delivered where the Supplier at a minimum, meets the quality
expectations Annabel Travers
% of Contract & Supplier Management scorecards delivered where the Supplier at a minimum, meets the Service Annabel Travers
Page 124

Page 125

Performance Indicator Owner
expectations.
% of C&SM scorecards submitted against the total number due Annabel Travers
Annual Cash Savings target achieved Annabel Travers
% of Contract award notices published within 30 calendar days from award letter being sent Annabel Travers
Action Due Date Owner
Implement the Fit for Future Action Plan for Procurement– P2P Phase 1 31-Mar-2023 Annabel Travers
Deliver Procurement Savings and Benefits 31-Mar-2023 Annabel Travers
Refresh the Contract and Supply Management Policy 31-Mar-2023 Annabel Travers
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Failure to secure best
value of procurement
spend and ensure
compliance with
financial regulations
Improved procurement management process,
contract strategies, planning, monitoring and
reporting in collaboration with services will
continue to mitigate against non-compliant
procurement spend 
01-Sept-2022 Angela Wilson
Failure to continue to
achieve increased
savings from
procurement activity
As second or third generation revenue contracts
seldom deliver the same cost savings as first
generation, the contract strategies need to focus
on governance, operating models, total cost of
ownership, service quality and innovation
01-Sept-2022 Angela Wilson
Page 125

Page 126

Page 126

Page 127

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution and Property Services
Corporate Services Committee : 2 November 2022
___________________________________________________________________
Subject: Annual Procurement Report 
1. Purpose
1.1 The purpose of this report is to note the Annual Procurement Report for
2021/22.
2. Recommendations
2.1 It is recommended that Members note the Annual Procurement Report for
2021/22 as outlined in Appendix 1.
3. Background
3.1 The Procurement Reform (Scotland) Act 2014 (the Act) requires the Council to
publish an Annual Procurement Report (APR) which summarises the
performance of the Council in delivering its Procurement Strategy.  
3.2 The APR relates specifically to regulated procurement which is defined as:
“…any procurement from £50k for Supplies and Services contracts and from
£2m for Works contracts. A regulated procurement is completed when the
award notice is published or where the procurement process otherwise comes
to an end.”
4. Main Issues
4.1 The Council’s total regulated procurement spend for 2021/22, excluding West
Dunbartonshire’s Health and Social Care Partnership (WD HSCP), was 98% /
£77.283m.  Further, the Council’s compliant regulated procurement spend,
including WD HSCP, was 93% / £118.248m.  
4.2 The APR 2021/22, that includes WD HSCP’s procurement spend, can be found
at Appendix 1.  Members should note that the format is designed to ensure
compliance in publishing information required in line with the Act.  It highlights
progress made over the past financial year on regulated procurements
undertaken and sets out the compliant regulated procurements awarded.  
4.3 Key details within the APR 2021/22 includes:
• A summary of 51 regulated contracts completed;
• Review of regulated procurement compliance - 93% / £118.248m;
• Social (community) benefits summary;
• Supported businesses and social enterprises summary; and the
• Sustainability summary
5. People Implications
5.1 There are no people implications arising from this report.
ITEM 13
Page 127

Page 128

6. Financial and Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.  However, it is important that all officers of the Council supports the
actions required to continuously improve procurement compliance.
7. Risk Analysis
7.1 There is a risk that improved performance, process and capability in
procurement is not achieved, however this can be mitigated through the
delivery of the Procurement Strategy.
8. Equalities Impact Assessment (EIA)
8.1 An EIA is not required with this report.
9. Consultation
9.1 Ongoing engagement continues across service management teams to progress
procurement compliance and social benefits.
10. Strategic Assessment
10.1 This report support’s the Council’s aims in terms of providing open, accountable
and accessible local government and supporting the following strategic priority:
• A strong local economy and improved employment opportunities;
• Meaning community engagement with active empowered and informed
citizens who feel safe and engaged; and
• Open, accountable and accessible local government.
Name:  Angela Wilson
Designation:  Chief Officer – Supply, Distribution and Property Services
Date:  2 November 2022
Person to Contact: Annabel Travers, Procurement Manager, 
annabel.travers@west-dunbarton.gov.uk.
Appendices: Annual Procurement Report - 2021/22
Background Papers: Procurement Improvement, 8 September 2021,
Corporate Services Committee
Page 128

Page 129

Annual
Procurement
Report
2021 / 2022
Appendix 1
Page 129

Page 130

2 | P a g e
Contents
Introduction Page 3
Summary of regulated procurement completed Page 4
Review of regulated procurement compliance Page 5
Social (community) benefits summary Page 6
Supported businesses and social enterprises Page 10
Sustainability Page 13
Future regulated procurements  Page 16
Annual Procurement Report owner Page 16
Appendix 1:  Outcomes achieved Page 17
Annex A:  Summary of regulated procurements Page 19
Annex B:  Regulated procurements Page 24
Annex C:  Non-compliant regulated spend Page 31
Annex D:  Future regulated procurement Page 34
Page 130

Page 131

3 | P a g e
1. Introduction
1.1 In accordance with Section 15 of the Procurement Reform (Scotland) Act 2014,
the Council published its Sustainable Procurement & Commercial Strategy
(Strategy) for the period 2021 to 2026.   Section 18(2) (a) of the Procurement
Reform (Scotland) Act 2014 requires the Council to detail “...a summary of the
regulated procurements that have been completed during the year covered by the
report".  This Annual Procurement Report (APR) outlines the key elements of
regulated procurements for the period 1 April 2021 – 31 March 2022.
1.2 The Strategy is closely aligned to the Council’s vision, values and ethos and
describes the role procurement has in supporting the delivery of the Council’s
Strategic Plan.  It sets out the key procurement objectives of the Council for 2021
to 2026.  The delivery of these objectives will support the Council as it continues to
face significant challenges, including:
• Resilience planning;
• Impact of EU withdrawal;
• Inflation in cost of supplies, global supply chain shortages;
• Building a stronger community through commissioning services which aim to
give more power to the community and promote community action;
• Supporting services to meet financial requirements;
• Continuing to proactively engage with all sectors across the local economy;
• Sustainability and Climate Change duties
1.3 Appendix 1 and Annex A to D sets out the regulated procurement achievements,
actions and future plans for the Council, which includes West Dunbartonshire
Health and Social Care Partnership (WD HSCP).  Regulated procurement refers to
any procurement from £50k for Supplies and Services contracts and from £2m for
Works contracts. A regulated procurement is completed when the award notice is
published or where the procurement process otherwise comes to an end.  
Regulated procurements can refer to procurements delivered through new
contracts or from utilising framework agreements (FA) or dynamic purchasing
systems (DPS).
1.4 The Council maintains a public Contract Register which provides information on
current contracts.  The Tendering Committee approves new contracts for Supplies,
Services and Works with a value from £50k and Social Care and Other Specific
Services from the Light Touch Regime threshold (currently from £663,540). 
Page 131

Page 132

4 | P a g e
1.5 The Scottish Government’s Annex A:  Summary of Regulated Procurements, is   
detailed in this report.  As well as the mandatory data, the Council has gone further
by detailing additional data including the data pertaining to businesses in the
community.   
2. Summary of regulated procurement completed 
2.1 Details of regulated procurements awarded by the Council between 1 April 2021
and 31 March 2022 can be found at Annex B:  Regulated Procurements and
Annex A. Collaborations with other public bodies to maximise mutual benefits,
where appropriate, are included in the regulated procurements.  This includes
Scottish Government, CoSLA, Crown Commercial Services, Scotland Excel and
the Council all acting as the contracting authority when procuring Supplies,
Services and Works. 
2.2 17 regulated contracts where appropriately awarded without a competitive
procurement process: 
Reason Regulated Contract
Response to COVID-19 CO2 Monitors for Education
People based Provision of Residential Housing Support Services for
Adults Aged 16 and Over
Provision of Residential Housing Support Services for
Young People Aged 16-21 Years
Provision of Dumbarton Area Council on Alcohol’s
Community Based Alcohol Support Service
Provision of Alcohol Related Brain Damage
Community Support Services
Provision of Recovery Group Programmes –
Community Services for those Affected by Substance
Misuse
Provision of Home Care and Housing Support
Services (2121-21)
Provision of Care at Home, Housing Support and
Respite Services for Those Living With Dementia
Provision of Home Care and Housing Support
Services (2021-25)
Provision of Home Care and Housing Support
Services (2021-26)
Page 132

Page 133

5 | P a g e
Reason Regulated Contract
People based Provision of Home Care and Housing Support
Services (2021-28)
Provision of Learning Disability Services - Community
Based Support Service
Provision of Children's Residential Care and Education
Services Including Short Breaks
Provision of LD Services: Supported Living Service
(2122-07)
Provision of LD Services: Supported Living Service
(2122-08)
Provision of LD Services: Supported Living Service
(2122-09)
Provision of LD Services: Supported Living Service
(2122-10) 
3. Review of regulated procurement compliance
3.1 Based on an analysis of spend data, of the £127,605,938 regulated procurement
spend, 93% / £118,247,791 (Council and WD HSCP) was compliant with regulated
procurements.  Further, of the £78,947,631 regulated procurement spend, 98% /
£77,282,507 (Council only) was compliant with regulated procurements: 
Spend
Type
Total Regulated
Spend
Compliant
Regulated Spend 
Non-Compliant
Regulated
Spend
Percentage
Compliant
Supplies £12,255,960 £12,130,185 £125,775 99%
Services £79,084,852 £69,852,480 £9,232,371 88%
Works £36,265,126 £36,265,126 £0 100%
Total £127,605,938 £118,247,791 £9,358,147 93% 
3.2 The summary detail is shown in Annex C:  Non-Compliant Regulated Spend and
also highlights where further work is required to achieve increased rates of
compliance.   Where there has been non-compliance with procedures, this is partly
due to service priorities which included the response to COVID-19 and the
combined value of spend across various services being more than the Financial
Regulation limits.
Page 133

Page 134

6 | P a g e
4. Social (community) benefits summary
4.1 The Council is committed to working with our local community and businesses to  
maximise local social value - one of the five strategic aims in the Council’s
Strategic Plan is for a strong local economy and improved employment
opportunities.   
4.2 The Council has implemented specific clauses within procurement contracts from    
£50k, known as social benefit clauses.  Social benefit clauses are requirements
which deliver wider benefits to our local community in addition to the core purpose
of a contract.  These clauses can be used to build a range of economic, social or
environmental benefits into Council contracts through a range of options which
may include, but are not limited to:
• Employment, work experience, training or modern apprenticeship
opportunities;
• Education engagement and curriculum support activities;
• Support for community and environment projects through donation of money,
labour, equipment or materials; and
• Other initiatives to support and develop local businesses, community groups
and the local third sector 
4.3 The social benefits questionnaire is part of the procurement documentation issued
to all bidders of Council tenders and includes target social benefits points based
on the annual value of the contract.  This is a transparent, fair and accountable
approach for assessing the impact of Social Benefits.   Details of the social
benefits points delivered (regulated and non-regulated contracts) in 2021/22 can
be found in the table below: 
Procurement Title Social Benefits 
Cleaning Services for Homeless
and Void Properties
Sub-contracted services to a local laundrette  
Sub-contracted services to a local company  
Reducing plastic by using washable cloths and
refillables
Transport provided to Clifftop Projects for a group
outing
Donated to West Dunbartonshire Community
Foodshare toy bank appeal 
Page 134

Page 135

7 | P a g e
Procurement Title Social Benefits
Cleaning Services for Homeless
and Void Properties
Donated to West Dunbartonshire Community
Foodshare
Maintenance of Wet Central
Heating Systems & Ancillary
Equipment*
Recruited an apprenticeship
Two employees recruited 
Purchasing sustainable materials 
Set a manned office 
Used local providers
Provision of Community Based
Psychological
Services/Counselling and
Supported Recovery Services for
Adults*
Sub-contracted services 
Three employees recruited 
Provision of Digital TV
Maintenance Services*
Donated paints to a local project
Donated to £600 of food for Thought and West
Dunbartonshire Community Foodshare
Provision of Window Cleaning
Services for 6 Council Buildings**
Recruited a member of staff 
Donated to Drumchapel Tennis Club
Asbestos Surveys for External
Wall Insulation Programme*
Donated £50 to Unity-Enterprise
Donated to West Dunbartonshire Community
Foodshare
Removed and recycled waste
Tyres - Cars and Vans Donated to Food for Thought
Emergency Contract for
Processing & Treatment of
Waste Wood**
Donated 2 tonne of compost to Renton
Community Garden  
Page 135

Page 136

8 | P a g e
Procurement Title   Social Benefits 
Treatment and Disposal of
Recyclable and Residual Waste
for Inert Soil & Rubble*
One employee recruited  
Processing & Treatment of Mixed
Scrap Metal*
Donated £500 of materials to Alternatives building
project at Knowetop farm
Provision of Dumbarton Area
Council on Alcohol’s Community
Based Alcohol Support Service
Commissioned catering services from Food for
Thought
Uses eco-friendly cleaning products
Commissioned local room hire contracts 
Provision of Alcohol Related
Brain Damage Community
Support Services
Sub-contracted to Kenny McDonald Decorators to
paint the Clydebank premises
Provision of Recovery Group
Programmes – Community
Services for those Affected by
Substance Misuse
Sub-contracted services to AJM Joiners, David
Caldwell Plumbing & Electrical and Innovation
Flooring Services 
Four employees recruited 
Provision of Care at Home,
Housing Support and Respite
Services for Those Living With
Dementia
Two employees recruited 
Provision of Home Care and
Housing Support Services -
Carman Care
Four employees recruited 
Provision of LD Services:
Supported Living Service -
Enable
One employee recruited 
Presented at a Care Career event at the Golden
Jubilee
Provision of Home Care and
Housing Support – Joans Carers
Eight employees recruited 
Provision Children's Residential
Care and Education Services
Including Short Breaks
Donated £500 to the Bonhill Community Garden
project and £500  to Clydebank Community
Sports Hub 
Provision of Learning Disability
Services - Community Based
Support Service
Recruited a member of staff 
Page 136

Page 137

9 | P a g e
Procurement Title   Social Benefits 
Provision of Learning Disability
Services - Community Based
Support Service
Arranged for a Centre 81 Gardener to present at
an allotment where members learned about
planting, growing and harvesting
Used Aunties Tea Room in Dumbarton, The
Fountain Café in Alexandria, Dalmuir Café in
Dalmuir, SixtyAte Bar, Titan Bar, McMonagle’s
and Chandlers in Clydebank for group outings.
Accommodation Based Services One employee recruited 
Drama teacher and Literacy teacher are
subcontracted to deliver workshops to clients 
Community Link Worker Donated food items to Men's Health Scotland,
Clydebank
Reception, Processing &
Treatment of Bulky Waste
One employee recruited
Building Materials** Delivered two mentoring workshops
Playdrome** Work experience for four pupils 
Residential Housing Support
Services for Young People aged
16-21 years
Two employees recruited 
Work experience for two pupils 
Provision of LD Services:
Supported Living Service –
Cornerstone Community Care
Recruited two members of staff 
Recruited two Kickstart apprentices 
Use of local providers 
Provision of LD Services:
Supported Living Service - Share
Scotland
Two employees recruited 
Sub-contracting to the local Dumbarton Foot
Clinic and Cleanfast
*  Regulated contract awarded in a previous year
**  Non-regulated contract 
Page 137

Page 138

10 | P a g e
4.4 The national virtual “Meet the Buyer” event took place in June 2021 with
representatives from the public sector including the Council. This event allowed
suppliers to engage with virtual exhibitors from the public sector, private
contractors and business support providers. It was scheduled in the alternative
format and aimed to support efforts towards economic recovery from the COVID-
19 pandemic. 
4.5 A “Talking Tenders” supplier event took place in March 2022 supported by the
Supplier Development Programme.  This event was specifically aligned to local
businesses keen to find out more about the tender opportunities for the Sub-
contractor and Specialist Contractors contracts.  23 businesses attended this
event. 
5. Supported businesses and social enterprises
5.1 A supported business’ primary aim is the social and professional integration of
disabled or disadvantaged persons.  At least 30% of the employees of those
businesses must be disabled or disadvantaged.  This is delivered, not only through
the supplies, services and works they deliver, but also by providing meaningful
employment, training and social support for those who may otherwise be excluded
from the workplace. 
5.2 There are no supported businesses located within the West Dunbartonshire area
and there was no regulated contracts awarded to supported businesses during
2021/22.  However, the Council has supported business non-regulated contracts
awarded during 2021/22 and in addition, live regulated contracts awarded before
2021/22: 
Supplier 2021/22 Spend
Hansel Alliance £57,724
Hey Girls CIC £22,710
The Royal British Legion T/A Britain's Bravest
Manufacturing Company
£ 4,782
Lady Hague Poppy Factory £31 
Page 138

Page 139

11 | P a g e
5.3 Social enterprises aim to make a profit but unlike traditional businesses, they
reinvest or donate their profits to create positive social change.  They empower
communities, tackle social problems and create jobs - particularly for people who
are at a disadvantage in the standard jobs market.  According to the Social
Enterprise Census 2017, there was 5,600 social enterprises operating in Scotland
with 68 located within the West Dunbartonshire area. 
5.4 From the data that was available on social enterprises, of the Council’s regulated
procurement spend, there was 35 social enterprises that the Council spent with in
2021/22 with 7 social enterprises with a base in West Dunbartonshire.  Also
detailed below is the non-regulated procurement spend on social enterprises in
2021/22: 
Social Enterprise Providers Spend in 2021/22
Cornerstone Community Care £4,144,010
Richmond Fellowship  £1,629,818
Quarriers Homes  £1,555,264
Erskine Hospital  £882,572
Share Scotland  £824,010
Enable  £659,913
Kibble Education and Care Centre £651,354
East Park  £605,478
Carman Care*  £584,317
Carevisions  £583,735
Arisaig Services  £561,455
Alternatives* £420,427
Harmeny Education Trust Limited  £422,843
Blue Triangle  £347,949
Page 139

Page 140

12 | P a g e
Social Enterprise Providers Spend in 2021/22
Scottish Autism £284,687
Swiis Foster Care Ltd £281,303
The Mungo Foundation £278,822
Dumbarton District Women's Aid* £233,813
Unity Enterprise £231,877
JMT Care Services Limited £216,570
Sense Scotland £204,034
Clydebank Womens Aid* £190,528
Lomond & Clyde Care & Repair Ltd* £181,639
William Simpson's Home £129,148
Foster Care Connect £127,406
Balnacraig School £126,643
Ben View Resource Centre* £97,463
Scottish Association Of Mental Health £82,680
Camphill Blair Drummond Trust Ltd £82,208
Neighbourhood Networks £70,008
Home From Home (Scotland) Ltd* £61,167
Hansel Alliance £57,724
Sacro £57,259
Fostering Relations Ltd £51,053
Garvald West Linton Limited – non regulated £50,395
Page 140

Page 141

13 | P a g e
Social Enterprise Providers Spend in 2021/22
David Cargill House – non regulated £39,143
Hey Girls CIC – non regulated £22,710
The Wise Group – non regulated £14,799
Spruce Carpets Ltd – non regulated £3,223
Libertie Project Ltd – non regulated £2,060
MHSCOT– non regulated £1,500
Green Aspirations Scotland CIC – non regulated £900
St Andrew's First Aid – non regulated £355
Whiteinch Centre Ltd – non regulated £154
*  Based in West Dunbartonshire 
6. Sustainability
6.1 The sustainable procurement policies and guidelines from the Scottish
Government identifies a range of policies, tools and procedures that enable
compliance with the Sustainable Procurement Duty.  Further, the Council
produced a Climate Change Strategy and Action Plan to set out the foundations
for a plan of action and response to Scotland’s Climate Emergency and 2045 net
zero carbon reduction target. 
6.2 Everything procured, from construction works to waste services to janitorial
supplies has an impact on the environment and society. Therefore, the Council is
able to make a positive contribution to sustainability through its procurement
decisions.  The Sustainability in Procurement Guidance details how the Council
will meet its commitments to sustainable procurement. 
6.3 Examples of procurement activity in 2021/22 which has contributed to the
Council’s compliance with Sustainability Duties including Climate Change Duties
and Circular Economy are: 
Page 141

Page 142

14 | P a g e
Procurement Title Sustainability Duties
Smollett Fountain
Tactical Urbanism
Trial Civil Works*
Recycling of any used materials 
Tyres - Cars and
Vans
Recycling of tyres
Tyres - Trucks Recycling of tyres
Purchase of Gritters Vehicles are compliant with the current regulations and have
the latest emission reduction technology reducing the impact of
Council fleet on air quality
The new vehicles are fuel efficient and will emit less NOX, SOX
and CO2 Emissions than the current models and will be
compliant with Euro VI standards
Reception,
Processing &
Treatment of Bulky
Waste
The contract applies the waste hierarchy in line with Zero
Waste Scotland’s guidance. Quantifiable actions and targets
are held 
Reception,
Processing &
Treatment of
Residual Waste
The contract applies the waste hierarchy in line with Zero
Waste Scotland’s guidance. Quantifiable actions and targets
are held
Cleaning Services
for Homeless and
Void Properties
Reducing the plastic by using washable cloths and refilling
products
St Mary's Boiler
Replacement*
Energy Related Products (ERP) rating of 93%/'A' rated and
meet the UK Government buying standards for domestic
boilers
Provision of
Corporate Taxi
Services - WDN10N
Lubricant oils and tyres are recycled and reduces omissions by
introducing electric cars
Provision of
Corporate Taxi
Services - WD014N
Lubricant oils and tyres are recycled and reduces omissions by
introducing electric cars
Processing &
Treatment of
Textiles*
Generates 100% diversion or reuse and diversion from landfill. 
The contract applies the waste hierarchy in line with Zero
Waste Scotland’s guidance with quantifiable actions and
targets held and monitored
Page 142

Page 143

15 | P a g e
Procurement Title Sustainability Duties
Library
Refurbishment*
Intelligent route planning to reduce fuel consumption, following
a vehicle upkeep / replacement programme to ensure the most
efficient fleet possible and encouraging staff to reduce
emissions and use public transport (e.g.: through a bus fare
subsidy scheme)
FSC and / or PEFC certified to ensure the timber / timber
products have been sustainably produced
Library
Refurbishment*
FSC and / or PEFC certified to ensure the timber / timber
products have been sustainably produced
Uses recycled materials and also recycles the product at end-
of-life   
Supply & Installation
of Library Furniture
Sourcing timber from sustainable sources 
Reduces fuel consumption and advising staff to use public
transport where required
Sustainable fabrics for chairs
Collection,
Processing &
Treatment of Mixed
Glass*
Generates 100% diversion or reuse and diversion from landfill  
The contract applies the waste hierarchy in line with Zero
Waste Scotland’s guidance with quantifiable actions and
targets held and monitored
Processing &
Treatment of Co-
mingled Recyclate
Generates 100% diversion or reuse and diversion from landfill  
The contract applies the waste hierarchy in line with Zero
Waste Scotland’s guidance with quantifiable actions and
targets held and monitored
Reception,
Processing &
Treatment of Non-
Shredded Wood*
Generates 100% diversion or reuse and diversion from landfill       
Compactors for
Dalmoak
Reduction in fuel consumption due to less lorry trips to waste
disposal site
Demolition of
Former Willox Park
Care Home*
All materials arising from the works are sorted - removed from
site and whenever possible re-used, re-manufactured or
recycled to recover some of their inherent value
*  Non regulated contracts 
Page 143

Page 144

16 | P a g e
7. Future regulated procurements
7.1 Over the next two years, there will be a mix of recurring requirements and one-off
opportunities.   A summary of procurements anticipated in the next two years is
provided in Annex D:  Future Regulated Procurement.  This doesn’t include ad-hoc
or reactive requirements and until full scoping activities are undertaken and the
contract strategies are complete, the timeline, contracting approach and values
may be subject to change. 
8. The Annual Procurement Report owner
Annabel Travers
Procurement Manager
Page 144

Page 145

Appendix 1:  Outcomes Achieved 
A strong local economy and improved job opportunities 
A growing economy
Performance Indicator 2019/20
Value
2020/21
Value
2020/21
Target
2021/22
Target
2021/22
Value
% of procurement spent on local enterprises and / or
who have a presence in West Dunbartonshire
New indicator 31.6% 36% 38% 43.1%
Action Due Date 
Improving access to the Council’s contracts  31-Mar-22 
Increased employment and training opportunities
Performance Indicator 2019/20
Value
2020/21
Value
2020/21
Target
2021/22
Target
2021/22
Value
% of Contract & Supplier Management scorecards
delivered where the Supplier at a minimum, meets the
Social Benefits expectations
New indicator  95% 96.4%
Action Due Date 
Deliver procurement savings and benefits 31-Mar-22 
Supported individuals, families and carers living independently and with dignity 
Efficient and effective frontline services that improve the everyday lives of residents 
A continuously improving Council delivering best value
Page 145

Page 146

18 | P a g e
Performance Indicator 2019/20
Value
2020/21
Value
2020/21
Target
2021/22
Target
2021/22
Value
Annual Cash Savings target achieved £544,022 £1,024,595 £400,000 £400,000 £732,235
% of contracts that are compliant 90.3% 97.9% 100% 100% 93%
% of Contract & Supplier Management scorecards
submitted against the total number due
55% 75% 75% 85% 68%
% of Contract & Supplier Management scorecards
delivered where the Supplier at a minimum, meets the
Cost expectations
New indicator 95% 85%
% of Contract & Supplier Management scorecards
delivered where the Supplier at a minimum, meets the
Quality expectations
New indicator 95% 96.9%
Percentage of Contract & Supplier Management
scorecards delivered where the Supplier at a minimum,
meets the Service expectations
New indicator 95% 90%
Action Due Date
Deliver procurement savings and benefits 31-Mar-22
Maximise procurement efficiency and collaboration 31-Mar-22
Embed procurement sustainability 31-Mar-22
Page 146

Page 147

19 | P a g e
Annex A:  Summary of Regulated Procurements
1) Organisation and Report Details
a) Contracting Authority Name West Dunbartonshire Council 
b) Period of the annual procurement report 1 April 2021 – 31 March 2022
c) Required by s18 Procurement Reform (Scotland) Act 2014 to prepare an annual
procurement report? 
Yes
2. Summary of Regulated Procurements Completed 1 April 2021 – 31 March 2022
a) Total number of regulated contracts awarded within the report period 51
b) Total value of regulated contracts awarded within the report period £27,284,136
c) Total number of unique suppliers awarded a place on a regulated contract
awarded during the period
47    
i)  how many of these unique suppliers are SMEs 18   
ii) how many of these unique suppliers how many are Third sector bodies 15
Additional Information
Award of regulated Supplies contracts  10 / £2,663,612
Award of regulated Service contracts  41 / £24,620,524  
Page 147

Page 148

20 | P a g e
Additional Information - continued
Award of regulated contracts with local unique SMEs  5 / £1,756,774
Award of regulated contracts with unique SMEs who have a presence in West
Dunbartonshire 
4 / £1,732,542
Award of regulated contracts to local Third sector bodies  1 / £575,956
3. Review of Regulated Procurements Compliance
a) Number of regulated contracts awarded within the period that complied with your
Procurement Strategy
51
b) Number of regulated contracts awarded within the period that did not comply with
your Procurement Strategy
0
4. Community Benefit Requirements Summary
a) Total number of regulated contracts awarded with a value of £4 million or greater 1
b) Total number of regulated contracts awarded with a value of £4 million or greater
that contain Community Benefit Requirements
1
c) Total number of regulated contracts awarded with a value of less than £4 million
that contain a Community Benefit Requirements
24  
Page 148

Page 149

21 | P a g e
Key Contract Information on community benefit requirements imposed as part of a regulated procurement that
were fulfilled during the period:
d) Number of Jobs Filled by Priority Groups Not measured in this way*
e) Number of Apprenticeships Filled by Priority Groups Not measured in this way*
f) Number of Work Placements for Priority Groups Not measured in this way*
g) Number of Qualifications Achieved Through Training by Priority Groups Not measured in this way*
h) Total Value of contracts sub-contracted to SMEs Not measured in this way*
i) Total Value of contracts sub-contracted to Social Enterprises Not measured
j) Total Value of contracts sub-contracted to Supported Businesses  Not measured
k) Other community benefit(s) fulfilled Not measured in this way*
* The Council have implemented a more simple measure of local social benefits that supports the aims of the Council’s
Strategic Plan
Additional Information
Social benefits points during the period covered by the report for all contracts 107
5. Fair Work and the real Living Wage
a) Number of regulated contracts awarded during the period that included a Fair
Work criterion     
10 
Page 149

Page 150

22 | P a g e
5. Fair Work and the real Living Wage - continued
b) Number of unique suppliers who have committed to pay the real Living Wage in
the delivery of a regulated contract awarded during the period
43
c) Number of unique suppliers who are accredited Living Wage employers and were
awarded a regulated contract awarded during the period
16
d) Number of unique suppliers who have signed up to the Scottish Business Pledge
and were awarded a regulated contract awarded during the period
4
6. Payment Performance
a) Number of valid invoices received during the reporting period 73,760
b) Percentage of invoices paid on time during the period (“On time” means within
the time period set out in the contract terms)
90.74%
c) Number of regulated contracts awarded during the period containing a contract
term requiring the prompt payment of invoices in public contract supply chains
7
d) Number of concerns raised by sub-contractors about the timely payment of
invoices within the supply chain of public contracts
Not measured
7. Supported Businesses Summary
a) Total number of regulated contracts awarded to supported businesses during the
period
0
b) Total spend with supported businesses during the period, including: £85,247
i) spend within the reporting year on regulated contracts Not measured
Page 150

Page 151

23 | P a g e
7. Supported Businesses Summary - continued    
ii) spend within the reporting year on non-regulated contracts  Not measured
8. Spend and Savings Summary
a) Total procurement spend for the period covered by the annual procurement
report
£142,949,129
(all spend)
b) Total procurement spend with SMEs during the period covered by the annual
procurement report 
Minimum of 
£49,766,133
(all spend)
c) Total procurement spend with Third sector bodies during the period covered by
the report
Minimum of 
£23,980.428
(all spend)
d) Percentage of total procurement spend through collaborative contracts £80,153,725
(all spend)
e) Total targeted cash savings for the period covered by the annual procurement
report
£400,000    
i)    targeted cash savings for Cat A contracts Not measured    
ii)   targeted cash savings for Cat B contracts Not measured    
iii)  targeted cash savings for Cat C contracts Not measured
f)  Total delivered cash savings for the period covered by the annual procurement
report
£732,235    
i)   delivered cash savings for Cat A contracts Not measured    
ii)  delivered cash savings for Cat B contracts Not measured    
iii) delivered cash savings for Cat C contracts Not measured
Page 151

Page 152

24 | P a g e
8. Spend and Savings Summary - continued
g) Total non-cash savings value  Not measured
9. Future Regulated Procurements 1 April 2022 – 31 March 2024
a) Total number of regulated procurements expected to commence in the next two
financial years
121 
(including 38 regulated contracts
already placed)
b) Total estimated value of regulated procurements expected to commence in the
next two financial years
£524,839,257
(including £42M of regulated
contracts already placed and
excluding where the value is to
be determined) 
Annex B:  Regulated Procurements 
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Provision of Banking
Services
Clydesdale
Bank Card
Services
£62,913 08/03/2021* 01/04/2021 01/04/2024
Provision of Alcohol Related
Brain Damage Community
Support Services
The Richmond
Fellowship
Scotland
£196,000 30/03/2021* 01/04/2021 31/03/2023
Carefirst Support and
Maintenance
OLM Systems
Limited
£270,000 21/04/2021 01/04/2021 31/03/2024
Page 152

Page 153

25 | P a g e
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Provision of Home Care and
Housing Support Services
Hands-On
Homecare
£270,473 31/03/2021* 01/04/2021 31/03/2025
Provision of Home Care and
Housing Support Services
Carman Care £449,609 31/03/2021* 01/04/2021 31/03/2023
Provision of Home Care and
Housing Support
Joan Carers £471,058 31/03/2021* 01/04/2021 31/03/2022
Provision of Dumbarton Area
Council on Alcohol’s
Community Based Alcohol
Support Service
DACA £532,000 31/03/2021* 01/04/2021 31/03/2023
Provision of Home Care and
Housing Support Services
Carewatch
Dunbartonshire
£567,830 31/03/2021* 01/04/2021 31/03/2023
Provision of Recovery Group
Programmes – Community
Services for those Affected
by Substance Misuse
Alternatives £575,956 30/03/2021* 01/04/2021 31/03/2023
Provision of Home Care and
Housing Support Services
Alltogether
Care Services
Ltd
£601,980 31/03/2021* 01/04/2021 31/03/2022
Provision of Care at Home,
Housing Support and
Respite Services for Those
Living With Dementia
Caledonia
Social Care
£655,745 31/03/2021* 01/04/2021 31/03/2024
Page 153

Page 154

26 | P a g e
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Replace End of Life Network
Distribution Layer Switches
Capita It
Services
Limited
£105,575 20/11/2020* 13/04/2021 12/04/2022
Provision of Microsoft 365,
Phase 2 - Implementation
Sword IT
Solutions
Limited
£130,350 15/04/2021 15/04/2021 14/04/2022
Tyres - Cars and Vans McConechys
Tyre Services
Ltd
£70,796 23/04/2021 03/05/2021 01/05/2023
Tyres - Trucks McConechys
Tyre Services
Ltd
£76,916 23/04/2021 03/05/2021 01/05/2023
Provision of a Community
Link Worker
Health and
Social Care
Alliance
Scotland
£1,059,211 03/06/2021 03/05/2021 02/05/2024
Provision of 24 Hour
Residential Nursing - Victoria
House
Ram 217 Ltd
T/A Victoria
House
£110,181 26/05/2021 26/05/2021 26/05/2025
Purchase of Gritters ECON
Engineering
Limited
£545,784 13/05/2021 27/05/2021 27/05/2024
Reception, Processing &
Treatment of Bulky Waste
Barr
Environmental
Ltd
£3,225,000 25/05/2021 01/06/2021 31/12/2023
Reception, Processing &
Treatment of Residual
Waste
Barr
Environmental
Ltd
£5,738,063 25/05/2021 01/06/2021 31/12/2023
Page 154

Page 155

27 | P a g e
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Provision of Learning
Disability Services -
Community Based Support
Service
Neighbourhood
Networks
£140,000 07/06/2021 07/06/2021 06/06/2023
Provision of Accommodation
Based Services
Unity Enterprise £406,000 21/06/2021 21/06/2021 20/06/2023
Provision of 24 Hour
Residential Nursing Care
within a Care Home Setting
Alderwood
Care Home
£149,001 24/06/2021 24/06/2021 23/06/2023
Renewal of Citrix NetScaler
Licenses
XMA Limited £173,727 15/06/2021 30/06/2021 30/06/2022
Microsoft Licenses for
Education IT Estate
Insight Direct
(UK) Ltd
£89,520 15/06/2021 01/07/2021 30/06/2022
Provision of Residential
Housing Support Services
for Young People Aged 16-
21 years
Action for
Children
£156,600 14/06/2021 01/07/2021 30/06/2022
Provision of Residential
Housing Support Services
for Adults aged 16 and Over
Blue Triangle £382,116 14/06/2021 01/07/2021 30/06/2022
Cleaning Services for
Homeless and Void
Properties
Campbell
Cleaning
Services
£539,869 07/07/2021 12/07/2021 12/07/2023
Page 155

Page 156

28 | P a g e
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Clydebank Town Hall Gallery
Redesign Consultancy
Brown &
Wallace LLP
£55,650 30/07/2021 30/07/2021 31/03/2022
Provision of Children's
Residential Care and
Education Services Including
Short Breaks
Cora
Foundation
£1,455,724 24/08/2021 01/08/2021 31/07/2023
Server Maintenance
Renewal
Park Place
Technologies
Ltd
£54,070 23/07/2021 04/09/2021 03/09/2022
Provision of Corporate Taxi
Services - WDN10N
OK Taxi Group £51,300 30/07/2021 16/08/2021 15/08/2024
Provision of Corporate Taxi
Services - WD014N
OK Taxi Group £59,850 30/07/2021 16/08/2021 15/08/2024
Business Gateway
Workshops & Expert Help
Services
Business
Development
Advisers Ltd
£85,680 30/09/2021 30/09/2021 29/09/2023
Supply & Installation of
Library Furniture
FG Library
Products
£205,000 20/09/2021 26/10/2021 24/09/2022
Collection, Processing &
Treatment of Mixed Glass
Sibelco Green
Solutions UK
Limited
-£57,600 08/10/2021 01/11/2021 30/09/2024
CO2 Monitors for Education Flamefast UK
Ltd
£121,950 27/10/2021 01/11/2021 31/01/2022
Page 156

Page 157

29 | P a g e
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Provision of LD Services:
Supported Living Service
Enable £312,871 24/11/2021 01/11/2021 23/10/2022
Provision of LD Services:
Supported Living Service
Quarriers £465,469 24/11/2021 01/11/2021 31/10/2022
Provision of LD Services:
Supported Living Service
Share Scotland £811,606 24/11/2021 01/11/2021 31/10/2022
Provision of LD Services:
Supported Living Service
Cornerstone
Community
Care
£2,732,985 24/11/2021 01/11/2021 31/10/2022
Provision of Emergency
Placement for 24hr
Residential / Nursing Care
Little Sisters of
the Poor
Greenock Scio
£158,845 02/11/2021 02/11/2021 02/11/2025
Network Access Layer
Switches
Capita
Business
Services Ltd
£513,257 12/11/2021 12/11/2021 11/11/2022
Processing & Treatment of
Co-mingled Recyclate
Enva Scotland
Limited
£972,000 18/11/2021 18/11/2021 17/11/2025
Compactors for Dalmoak Bergmann
Direct Ltd
£85,776 01/12/2021 06/12/2021 06/04/2022
Page 157

Page 158

30 | P a g e
Procurement Title Appointed
Supplier
Estimated
Total Value
Award Date Start Date End Date
(excluding
extensions)
Glencairn House
Refurbishment Architectural
Services
Turner and
Townsend
Project
Management
Ltd (Page/Park)
£150,000 23/02/2022 23/02/2022 22/06/2022
Provision of Emergency
Placement for 24hr
Residential
The Mungo
Foundation
£204,000 10/05/2022 10/02/2022 08/05/2026
SIP Trunking Project -
Telephone Line
Replacement
Capita Business
Services Ltd
£195,051 25/02/2022 25/02/2022 24/02/2025
Managed Work for Housing
Benefit and Council Tax
Reduction Claims
NEC Software
Solutions UK
Ltd
£115,383 04/03/2022 15/03/2022 14/03/2024
Provision of Emergency
Placement for 24hr
Residential
Alpha Care
Management
Services Ltd -
Carnbroe Care
Centre
£657,200 31/03/2022 31/03/2022 30/03/2026
* Indicates an award date than was before 1 April 2021
Page 158

Page 159

31 | P a g e
Annex C:  Non-Compliant Regulated Spend
Procurement Title  Estimated
Annual Spend
Actions
Provision of Home Care and
Housing Support
£2,637,985 Elements of care requirements are progressing and engaging with
Services on the procurement process on other aspects of care
Provision of Learning Disability
Supported Living Services
£1,532,586 Elements of care requirements are progressing and engaging with
Services on the procurement process on other aspects of care
Provision of Adult Mental Health
Services
£1,199,218 Engaging with Services on the procurement process
Provision of Childrens
Residential Care and Education
Services
£1,063,010 Progressing with the procurement process
Provision of Residential
Placements and Respite for
Adults with Learning and
Physical Disabilities and  Mental
Health Needs
£557,610 Elements of care requirements are progressing and engaging with
Services on the procurement process on other aspects of care
Design, Supply and Erection,
Dismantling of Scaffolding
£328,937 Contract now in place
Provision of Social Care Agency
Workers
£303,888 Contract not now needed
Page 159

Page 160

32 | P a g e
Procurement Title  Estimated
Annual Spend
Actions
Provision of 24 Hour Residential
Nursing Care  within a Care
Home Setting
£283,365 Engaging with Services on the procurement process
Provision of Removals of
Furniture and Equipment
£180,114 Engaging with Services on the procurement process
Provision of Support to Young
People & Families
£170,785 Engaging with Services on the procurement process
Provision of Training for
Educators
£89,600 Engaging with Services on the procurement process
Provision of Glyphosate to
Roads
£86,250 Engaging with Services on the procurement process
Provision of Education Materials £77,539 Engaging with Services on the procurement process
Provision of Wellbeing
Counselling Services
£76,000 Engaging with Services on the procurement process
Provision of Incidental Plant Hire £70,275 Progressing with the procurement process
Provision of Energy Efficient
Homes Services
£63,885 Engaging with Services on the procurement process
Provision of Recycled Fixtures
and Fittings
£61,167 Engaging with Services on the procurement process
Page 160

Page 161

33 | P a g e
Procurement Title Estimated
Annual Spend
Actions
Provision of Carers Support and
Advice Services
£60,966 Progressing with the procurement process
Provision of Independent
Parenting Capacity Assessment
£59,874 Engaging with Services on the procurement process
Provision of Play Activities and
Opportunities
£55,500 Engaging with Services on the procurement process
Provision of Specialist Vehicle
Accident Recovery and Repair
Services
£52,448 Engaging with Services on the procurement process
Provision of Metal and Steel
Work Repairs Services
£52,273 Engaging with Services on the procurement process
Provision of Licensing for Rent
Analysis Software
£51,775 Engaging with Services on the procurement process
Provision of Mentoring for Care
Experienced & Vulnerable
Young People to Raise
Attainment & Improve Life
Chances
£39,531 Engaging with Services on the procurement process
Provision of Recovery Group
Programmes
£32,449 Engaging with Services on the procurement process
* This table includes partial compliance spend
Page 161

Page 162

34 | P a g e
Annex D:  Future Regulated Procurement 
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Emergency
Placement for 24hr Residential
£204,000 Re-Let N/A 10/05/2022 10/02/2022*
Payment Processing Services £160,000 Re-Let N/A 26/11/2021* 01/04/2022
Payment Processing Solutions £106,667 Re-Let N/A 04/03/2021* 01/04/2022
Insurance Services for Right to
Buy Block Buildings Administered
by WDC
£2,179,176 Re-Let N/A 09/03/2022 01/04/2022
Clydebank - Provision of Support
and Advocacy for Women
Experiencing Domestic Abuse
£334,000 Re-Let N/A 10/05/2022 01/04/2022  
Page 162

Page 163

35 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Dumbarton - Provision of Support
and Advocacy for Women
Experiencing Domestic Abuse
£334,000 Re-Let N/A 10/05/2022 01/04/2022
ICT Device Replacement £496,532 Re-Let N/A 10/05/2022 01/04/2022
ICT Device Replacement £395,479 Re-Let N/A 10/05/2022 01/04/2022
Provision of Emergency
Placement for 24hr Residential
£568,000 Re-Let N/A 10/05/2022 04/04/2022
Emergency Care Package to
Enable Client Discharge from
Hospital
£124,000 New N/A 10/05/2022 27/04/2022
Provision of 24Hour Residential /
Nursing Care Within a Care
Home Setting - P25787
£149,656 Re-Let N/A 10/05/2022 09/05/2022  
Page 163

Page 164

36 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Appointment of a Delivery Agent
for Elements of the Exxon Site
Development
£1,000,000 New N/A 10/05/2022 06/06/2022
Provision of 24Hour Residential /
Nursing Care Within a Care
Home Setting - P75288
£64,199 Re-Let N/A 10/05/2022 07/06/2022
Emergency Provision of 24Hr
Residential / Nursing Care Within
a Care Home Setting (P29862)
£64,199 Re-Let N/A 10/05/2022 27/06/2022
Microsoft Licenses for Education
IT Estate
£62,814 Re-Let N/A 10/05/2022 01/07/2022
Renewal of Citrix NetScaler
Licenses
£199,025 Re-Let N/A 10/05/2022 01/07/2022
Procurement of Online Payments
System and Cashless Catering
System
£32,500** Re-Let N/A 10/05/2022 01/07/2022
Page 164

Page 165

37 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Insurance Services
(including Claims Handling) for
West Dunbartonshire Council
(WDC) & West Dunbartonshire
Leisure Trust (WDLT)
£228,668 Re-Let N/A 10/05/2022 01/08/2022
Provision of Insurance Services
(including Claims Handling) for
West Dunbartonshire Council
(WDC) & West Dunbartonshire
Leisure Trust (WDLT)
£3,320,613 Re-Let N/A 10/05/2022 01/08/2022
24 Hour Residential Nursing Care
(NCHC) - Eastwood Court
£153,920 Re-Let N/A 03/08/2021* 03/08/2022
24 Hour Residential Nursing Care
(NCHC) - Silverburn
£153,920 Re-Let N/A 03/08/2021* 03/08/2022
24 Hour Residential Nursing Care
(NCHC) - Eastbank
£153,920 Re-Let N/A 03/08/2021* 03/08/2022
Page 165

Page 166

38 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
24 Hour Residential Nursing Care
(NCHC) - Summerlee House
£153,920 Re-Let N/A 03/08/2021* 03/08/2022
Subcontractors Lot 1
Landscaping Rank 1
£1,550,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 1
Landscaping Rank 2
£1,550,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 4 Scaffolding £1,150,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 8 Plumbing £150,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 9 Small Jobs
Rank 1
£650,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 9 Small Jobs
Rank 2
£650,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 9 Small Jobs
Rank 3
£650,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Page 166

Page 167

39 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Subcontractors Lot 9 Small Jobs
Rank 3
£650,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 11 External
Building Fabrics Rank 1
£6,000,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 11 External
Building Fabrics Rank 2
£6,000,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 11 External
Building Fabrics Rank 3
£6,000,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Lot 11 External
Building Fabrics Rank 4
£6,000,000 Re-Let 03/03/2022 10/05/2022 08/08/2022
Subcontractors Asbestos Surveys £192,000 Re-Let N/A 10/05/2022 09/08/2022
Server Maintenance Renewal £58,183 Re-Let N/A 10/05/2022 03/09/2022  
Page 167

Page 168

40 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Supply and Fit of AV Equipment
at Denny Civic Theatre,
Dumbarton
£261,426 New N/A 10/05/2022 02/10/2022
Provision of ICT Device
Replacement
£747,000 New N/A Qtr 3 - 2022/23 Qtr 3 - 2022/23
Provision of Detailed Design for
Gruggies Burn Flood Alleviation
Scheme
£1,000,000 New N/A Qtr 3 - 2022/23 Qtr 3 - 2022/23
Exxon Site, Bowling,
Redevelopment 
£34,000,000 New N/A Qtr 3 - 2022/23 Qtr 3 - 2022/23
Provision of a Cycle to Work
Scheme
£250,000 Re-Let N/A Qtr 3 - 2022/23 Qtr 3 - 2022/23
Provision of Microsoft 365
Backup Solution
£100,000 Re-Let N/A Qtr 3 - 2022/23 Qtr 3 - 2022/23  
Page 168

Page 169

41 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of a Microsoft
Enterprise Agreement -
Corporate 365 Licencing
£1,754,448 Re-Let N/A Qtr 3 - 2022/23 Qtr 3 - 2022/23
Provision of Removals of
Furniture and Equipment
£720,456 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Training for
Educators
£358,400 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Glyphosate to Roads £345,000 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Education Materials £310,156 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Wellbeing
Counselling Services
£304,000 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Incidental Plant Hire £281,100 Re-Let N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Energy Efficient
Homes Services
£255,540 Re-Let N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Page 169

Page 170

42 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Recycled Fixtures
and Fittings
£244,668 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Metal and Steel
Work Repairs Services
£209,092 Re-Let N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Licensing for Rent
Analysis Software
£207,100 Re-Let N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Play Activities and
Opportunities
£222,000 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Specialist Vehicle
Accident Recovery and Repair
Services
£209,792 Re-Let Qtr 3 - 2022/23 Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Passivhaus
Appraisal
£1,200,000 New N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Alexandria Master Plan
Consultant 
TBD New N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Page 170

Page 171

43 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Treatment of Organic Waste £999,500 Re-Let N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of  Fire Risk
Assessments) and Fire
Engineering Reports for Multi
Storey Flats
£50,000 New N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Design & Construction of Play
Areas
£500,000 New N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of Object Based
Storage to Replace the Data
Domains
£150,000 New N/A Qtr 4 - 2022/23 Qtr 4 - 2022/23
Provision of ICT Security Partner £75,000 New N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
VJB ISDN Telephony
Replacement
£50,000 New N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Multi Function
Devices
£1,650,000 Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Page 171

Page 172

44 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Mentoring for Care
Experienced & Vulnerable Young
People to Raise Attainment &
Improve Life Chances
£118,593 Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Connecting Dunbarton
Regeneration Works
£2,388,985 New N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Road Civils
Infrasture Works
£2,500,000 Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Glencairn House Redevelopment
& Major Refurbishment
£11,200,000 New Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Home Care and
Housing Support
£7,913,955 New Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Learning Disability
Supported Living Services
£4,597,758 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Page 172

Page 173

45 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Adult Mental Health
Services
£3,597,654 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Childrens Residential
Care and Education Services
£3,189,030 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Residential
Placements and Respite for
Adults with Learning and Physical
Disabilities and  Mental Health
Needs
£1,672,830 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of 24 Hour Residential
Nursing Care  within a Care
Home Setting
£850,095 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Support to Young
People & Families
£512,355 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Carers Support and
Advice Services
£182,898 New / Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Page 173

Page 174

46 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Independent
Parenting Capacity Assessment
£179,622 Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Recovery Group
Programmes
£97,347 Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Upgrade for Obsolete Heating
Controls (BEMS)
£151,000 New Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Supply of Car and Van Tyres TBD New N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Supply of Truck Tyres TBD New N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Solar Panel
Maintenance
TBD New Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Care and Repair
Services for Homeowners
£210,417 Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Page 174

Page 175

47 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Small Plant Hire,
Repair and Ancillary Supplies &
Services
£720,000 Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Supply of Electricity for the
District Heating Network
TBD Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Supply of Natural Gas for the
District Heating Network
TBD Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Provision of Dunbartonshire
Argyll & Bute Valuation Joint
Board Print and Mail Services
£420,000 Re-Let Qtr 4 - 2022/23 Qtr 1 - 2023/24 Qtr 1 - 2023/24
Supply of Roadstone Materials £150,000 Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Supply of Domestic Furniture and
Furnishings
£1,500,000 Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Suppy of Personal Protective
Equipment
TBD Re-Let N/A Qtr 1 - 2023/24 Qtr 1 - 2023/24
Page 175

Page 176

48 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
New Build Willox Park New
Sheltered Housing
£3,570,000 New Qtr 1 - 2023/24 Qtr 2 - 2023/24 Qtr 2 - 2023/24
Provision of a Digital Upgrade of
the Community Alarm System
£924,000 New Qtr 2 - 2023/24 Qtr 3 - 2023/24 Qtr 3 - 2023/24
Provision of Catering Concession
- Clydebank Town Hall
TBD Re-Let Qtr 2 - 2023/24 Qtr 3 - 2023/24 Qtr 3 - 2023/24
Provision of Depot Rationalisation TBD New TBD TBD TBD
Supply of Fruit and Vegetables TBD Re-Let TBD TBD TBD
Purchase of 3 x Tractors £150,000 New TBD TBD TBD
Solar Panels for Clydebank
Leisure Centre
£61,000 New TBD TBD TBD
Provision of Fresh Meats,
Cooked Meats and Fresh Fish
TBD Re-Let TBD TBD TBD
Page 176

Page 177

49 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of First Aid Materials TBD Re-Let TBD TBD TBD
Provision of Frozen Foods TBD Re-Let TBD TBD TBD
Provision of Driver Training £176,719 Re-Let TBD TBD TBD
Provision of a Fleet Management
Solution
£149,573 Re-Let TBD TBD TBD
Hire of JCB Telehandler for
Waste Loading
£133,159 Re-Let TBD TBD TBD
Provision of Paint & Sundries £1,101,842 Re-Let TBD TBD TBD
Provision to Glass and Glazing £206,791 Re-Let TBD TBD TBD
Provision of Environment,
Interpretation and
Communication Design Branding
£184,785 Re-Let TBD TBD TBD
Page 177

Page 178

50 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Weed Control On All
Hard and Soft Landscaped Areas
Throughout West Dunbartonshire
£100,000 Re-Let TBD TBD TBD
Purchase of Vans, Light Goods
Vehicles and Heavy Goods
Vehicles
£3,400,000 New N/A TBD TBD
New Build of West Bridgend
Community Centre
£2,500,000 New TBD TBD TBD
Road Improvement of the A813 TBD New TBD TBD TBD
Road Improvement of the A811  TBD New TBD TBD TBD
New Build Development Queens
Quay Site 
£6,000,000 New TBD TBD TBD
Provision of Postal Services £300,000 Re-Let TBD TBD TBD
Page 178

Page 179

51 | P a g e
Procurement Title Estimated
Total Value
New /
Extended /
Re-Let
Contract
Notice
Advertised
Estimated
Award Date
Estimated
Start Date
Provision of Exxon Environmental
Insurance
TBD New TBD TBD TBD
Provision of Noise Insulation
Scheme
£86,000 New TBD TBD TBD
Provision of A Waste Transfer
Station
TBD New TBD TBD TBD
Provision of Three Council's
Waste Services
£83,000,000
(WDC Spend)
New TBD TBD TBD
Provision Services for Queens
Quay District Heating
£81,280 Re-Let TBD TBD TBD
Provision of Biomass Energy for
Dumbarton Academy &
Gartocharn Primary School
£250,000 New TBD TBD TBD
Provision of Dalmuir Municipal
Golf Course PGA Professional
TBD Re-Let TBD TBD TBD
* Indicates an award / start date than was before 1 April 2022
**Regulated if extended
Page 179

Page 180

Page 180

Page 181

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources 
Corporate Services Committee : 2 November 2022
___________________________________________________________________
Subject: Corporate Services Budgetary Control Report to 31 August 2022 
(Period 05)
1. Purpose
1.1 The purpose of this report is to advise the Committee on the performance of
the Corporate Services budget for the period to 31 August 2022.
2. Recommendations
2.1 Members are asked to:
i) note that the revenue account currently shows a projected annual
adverse variance of £0.119m (0.36% of the total budget) and
ii) note that the capital account is showing a projected in-year underspend
of -£0.778m (-10.4% of in-year budget) due to 2 projects showing
projected underspends as a result of delays to these projects with
explanations for delays detailed in Appendix 6. The project life
projection is currently showing a projected underspend of £-0.047m (-
0.4% of project life budget).
3. Background
3.1 Revenue Budget
At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23.
A total net budget of £33.919m was approved for services under the remit for
Corporate Services at that time.
Since then the following adjustments have been made to the original budget
agreed:
Description £m
Budget Agreed March 2021 33.919
June Council - Cost of Living Fund Allocation 0.065
Vacant posts removed to sundry services -0.593
Centralisation of Mobile Phones to ICT 0.014
Excess Welfare Fund budget moved to sundry services -0.065
33.338
ITEM 14
Page 181

Page 182

3.2 Due to the current financial challenges facing the Council recruitment
restrictions have been implemented and the filling of vacancies is subject to
active review. For variances linked to this action (beyond the budgeted
turnover targets), in year savings through not filling vacancies, are now being
removed from services and held in a central code. This has resulted in a
number of favourable service variance being removed from services and held
centrally (currently £0.593m).  This has no impact on the overall projected
outturn of the Council, just on how that outturn is reported. A few services
have still to have a final position agreed with the Chief Officer, so have not
been centralised as at period 5, meaning any favourable variances in relation
to their vacancies are still being reported within the service figures however
this will be updated in future budget control reports.
3.3 With vacancy savings being removed from service budgets and transferred to
a central budget, other projected overspends identified within services are
now more clearly reported. This demonstrates that, if the Council were to only
meet the budgeted turnover level of vacancies there would be a far more
significant overspend which highlights the extent to which the Council cannot
afford to operate with its current full establishment.
3.4 The effects of removing the vacancy savings from service budgets to a central
budget as at Period 5 are noted below:
Service with Vacancy
Transfers at Period 5
Variance
in BCR
£000
Vacancy
Savings
Moved to
Central
Budget
£000
Variance if
Vacancies
not
Removed
£000
Resources 48 78 (30)
Regulatory and Regeneration 312 355 (43)
People and Technology (59) 160 (219)
Corporate Services P5 total (593) 593 0
3.5 Capital Budget 
At the meeting of Council on 9 March 2022, Members also agreed the
updated 10 year General Services Capital Plan for 2022/2023 to 2031/32. 
The next three years from 2022/23 to 2024/25 have been approved in detail
with the remaining 7 years being indicative at this stage. The total project life
budget approved for projects that have either commenced or are due to
commence in that period total for Corporate Services was £11.080m.
4. Main Issues
Revenue Budget
Page 182

Page 183

4.1 The summary report at Appendix 1 identifies a projected annual adverse
variance (overspend) of £0.119m (0.36% of the total budget). Detailed service
reports are attached as Appendix 2. It should be noted however that this
assumes the budgeted 2% pay award. In light of the most recent pay award
negotiations it is likely that the actual pay award will be higher than 2%. Based
on the current offer being negotiated which is around 5%, the increase in cost
would be an additional £1.002m of which £0.762m will be covered by
additional Scottish Government funding leaving a balance of £0.240m to be
added to the projected 2022-23 outturn. 
4.2 There are seven projected annual variances in excess of £0.050m. Notes on
these variances are highlighted and noted within Appendix 3, with additional
information on action being taken to minimise or mitigate overspends where
possible.
4.3  Although the report indicates that expenditure is adverse in comparison to that
anticipated during the budget exercise, the present variance should be viewed
in the knowledge that there are a number of variable factors which could arise
between now and 31 March 2023 and which could affect the year end results.
Capital Budget
4.4 Appendices 4 to 6 highlight 2 projects showing an in-year underspend, 13
projects on target and 2 projects showing an in-year overspend. The overall
Corporate Services programme summary report at Appendix 5 shows that
there is a projected £0.778m (10.4% of the total programmed budget) to be
re-phased in future years.
There are two significant variances within the Capital Budget, these are
shown in the following table. See Appendix 6 for more details.
Project Variance
£m
ICT Security & DR -0.297
ICT Modernisation -0.472
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial or
procurement implications from this budgetary control report.
7. Risk Analysis
Page 183

Page 184

7.1 The main financial risks to the ongoing financial position relate to unforeseen
costs being identified between now and the end of the financial year. This can
affect all service areas
8. Equalities Impact Assessment (EIA)
8.1 No equalities impact assessment was required in relation to this report.
9. Consultation
9.1 All services involved in delivering the revenue and capital budgets have been
consulted in the compilation of this report.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the 5
strategic priorities of the Council’s Strategic Plan. This report forms part
of the financial governance of the Council.
__________________
Laurence Slavin
Chief Officer Resources
Date:  14 October 2022
________________________________________________________________
Person to Contact: Adrian Gray, Finance Business Partner
Council Offices, 16 Church Street, Dumbarton
Telephone: (01389) 737838
E-mail: adrian.gray@west-dunbarton.gov.uk
Appendices: Appendix 1 - Revenue Budgetary Control 2022/23
– Summary Report
Appendix 2 - Revenue Budgetary Control 2022/23
– Service Reports
Appendix 3 - Analysis of Revenue Variances over
£50,000
Appendix 4 - Overall Capital Programme Summary
Financials
Appendix 5 - Capital Programme – Red Status
Appendix 6 - Capital Programme – Green Status
Background Papers:
Ledger output – Period 05
Page 184

Page 185

General Services Revenue Estimates 2022/23 – Council 9
March 2022
General Services Capital Strategy 2021/22 to 2030/31 -
Council 9 March 2022
Wards Affected  All Wards
Page 185

Page 186

Page 186

Page 187

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES SUMMARY
PERIOD END DATE 31 August 2022
Total Budget
2022/23
Spend to Date
2022/23
Forecast
Spend
Annual
RAG
Status
Net Variance
attributable to
covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Audit 105 144 105 0 0%  0 0
Finance 1,398 592 1,429 32 2%  0 32
Rent Rebates & Allowances (341) 1,034 (341) 0 0%  0 0
Revenues & Benefits 2,103 1,053 2,147 44 2%  0 44
Finance Service Centre 303 110 312 9 3%  0 9
Cost of Collection of Rates 19 (14) (4) (23) -121%  0 (23)
Cost of Collection of Council Tax (790) (113) (790) 0 0%  0 0
Central Admin Support 2,558 1,030 2,545 (13) -1%  0 (13)
Procurement 482 303 479 (3) -1%  0 (3)
Democratic and Registration Service 756 297 774 19 2%  0 19
Environmental Health 699 294 750 51 7%  0 51
Licensing (117) (27) (99) 18 16%  0 18
Legal Services/Trading Standards 824 367 790 (34) -4%  0 (34)
Planning 377 226 629 252 67%  0 252
Transactional Services 743 301 746 3 0%  0 3
Human Resources (including risk) 1,283 517 1,283 0 0%  0 0
Information Services 4,502 2,495 4,440 (62) -1%  0 (62)
Change Support 497 177 496 (1) 0%  0 (1)
Communications & Marketing 333 107 325 (8) -2%  0 (8)
Citizen Services 1,284 541 1,305 21 2%  3 19
Performance & Strategy 357 80 315 (42) -12%  0 (42)
Clydebank Town Hall 458 49 458 (0) 0%  0 (0)
Office Accomodation 1,275 396 1,285 9 1%  0 9
Libraries 1,811 594 1,777 (35) -2%  (27) (8)
Arts and Heritage 371 134 346 (24) -7%  0 (24)
Catering Services 4,454 1,668 4,383 (71) -2%  0 (71)
Building Cleaning 1,703 882 1,661 (42) -2%  0 (42)
Building Cleaning PPP (331) (171) (331) (0) 0%  0 (0)
Facilities Assistants 2,100 801 2,119 19 1%  0 19
Facilities Management 396 126 397 0 0%  0 0
Leisure Management 3,638 2,298 3,639 1 0%  0 1
Events 89 80 89 0 0%  0 0
33,338 16,371 33,458 119 0.36%  (24) 144
Service / Subjective Summary Variance 2022/23
Total Net Expenditure
Appendix 1
Page 187

Page 188

Page 188

Page 189

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status 
£000  £000  £000  £000 %
Employee 28,621 10,867 28,613 (8) (0%) 
Property 2,108 549 2,137 30 1% 
Transport and Plant 168 29 153 (15) (9%) 
Supplies, Services and Admin 5,670 2,507 5,673 3 0% 
Payments to Other Bodies 6,277 3,367 6,509 232 4% 
Other 36,747 14,127 36,747 0 0% 
Gross Expenditure 79,591 31,446 79,832 242 0% 
Income (46,252) (15,074) (46,374) (122) (0%) 
Net Expenditure 33,338 16,371 33,458 119 0% 
£000 £000 £000 £000 %
Employee 402 153 402 0 0% 
Property 0 0% 
Transport and Plant 1 0 0 (1) (100%) 
Supplies, Services and Admin 2 2 3 1 50% 
Payments to Other Bodies 0 0% 
Other 0 0% 
Gross Expenditure 405 155 405 0 0% 
Income (300) (11) (300) 0 0% 
Net Expenditure 105 144 105 0 0% 
£000 £000 £000 £000 %
Employee 1,617 655 1,667 50 3% 
Property 0 0% 
Transport and Plant 0 0 0 (0) (100%) 
Supplies, Services and Admin 33 6 46 13 38% 
Payments to Other Bodies 2 2 2 0 0% 
Other 0 0% 
Gross Expenditure 1,653 663 1,715 63 4% 
Income (255) (71) (286) (31) (12%) 
Net Expenditure 1,398 592 1,429 32 2% 
£000 £000 £000 £000 %
Employee 0 0% 
Property 0 0% 
Transport and Plant 0 0% 
Supplies, Services and Admin 0 0% 
Payments to Other Bodies 0 0% 
Other 36,747 14,127 36,747 0 0% 
Gross Expenditure 36,747 14,127 36,747 0 0% 
Income (37,088) (13,093) (37,088) 0 0% 
Net Expenditure (341) 1,034 (341) 0 0% 
£000 £000 £000 £000 %
Employee 1,803 750 1,850 47 3% 
Property 0 0% 
Transport and Plant 2 0 1 (1) (58%) 
Supplies, Services and Admin 32 7 29 (3) (10%) 
Payments to Other Bodies 895 632 1,079 184 21% 
Other 0 0% 
Gross Expenditure 2,733 1,389 2,959 226 8% 
Income (629) (336) (812) (183) (29%) 
Net Expenditure 2,103 1,053 2,147 44 2% 
Finance
Rent Rebates & Allowances
Revenues & Benefits
Service Summary Variance 2022/23
All Services
Audit
Appendix 2
Page 189

Page 190

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status Service Summary Variance 2022/23
£000 £000 £000 £000 %
Employee 259 106 268 9 3% 
Property 0 0 0 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 44 4 44 0 0% 
Payments to Other Bodies 0 0% 
Other 0 0% 
Gross Expenditure 303 110 312 9 3% 
Income 0 0 0 0 0% 
Net Expenditure 303 110 312 9 3% 
£000 £000 £000 £000 %
Employee 0 0% 
Property 0 0% 
Transport and Plant 0 0% 
Supplies, Services and Admin 5 0 5 1 11% 
Payments to Other Bodies 100 15 105 5 5% 
Other 0 0% 
Gross Expenditure 104 15 110 6 5% 
Income (85) (29) (114) (29) (34%) 
Net Expenditure 19 (14) (4) (23) (121%) 
£000 £000 £000 £000 %
Employee 0 0% 
Property 0 0% 
Transport and Plant 0 0% 
Supplies, Services and Admin 69 25 69 0 0% 
Payments to Other Bodies 33 12 33 0 0% 
Other 0 0% 
Gross Expenditure 102 36 102 0 0% 
Income (892) (149) (892) 0 0% 
Net Expenditure (790) (113) (790) 0 0% 
£000 £000 £000 £000 %
Employee 905 304 905 0 0% 
Property 0 0 0 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 3 2 3 1 19% 
Payments to Other Bodies 73 0 73 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 981 306 982 1 0% 
Income (500) (3) (503) (3) (1%) 
Net Expenditure 482 303 479 (3) (1%) 
£000 £000 £000 £000 %
Employee 864 337 863 (1) (0%) 
Property 0 0 0 0 0% 
Transport and Plant 1 1 2 1 100% 
Supplies, Services and Admin 9 10 11 2 22% 
Payments to Other Bodies 0 0% 
Other 0 0% 
Gross Expenditure 874 348 876 2 0% 
Income (119) (51) (102) 17 14% 
Net Expenditure 756 297 774 19 2% 
Finance Service Centre
Democratic and Registration Service
Cost of Collection of Rates
Cost of Collection of Council Tax
Procurement
Page 190

Page 191

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status Service Summary Variance 2022/23
£000 £000 £000 £000 %
Employee 2,489 952 2,452 (37) (1%) 
Property 0 0 0 0 0% 
Transport and Plant 1 0 0 (1) (100%) 
Supplies, Services and Admin 12 6 12 0 0% 
Payments to Other Bodies 69 75 105 36 52% 
Other 0 0% 
Gross Expenditure 2,571 1,032 2,569 (2) (0%) 
Income (13) (3) (24) (11) (85%) 
Net Expenditure 2,558 1,030 2,545 (13) (1%) 
£000 £000 £000 £000 %
Employee 988 361 988 1 0% 
Property 7 2 7 0 0% 
Transport and Plant 12 4 11 (1) (8%) 
Supplies, Services and Admin 22 7 21 (1) (5%) 
Payments to Other Bodies 78 34 78 0 0% 
Other 0 0% 
Gross Expenditure 1,107 408 1,105 (2) (0%) 
Income (407) (114) (355) 52 13% 
Net Expenditure 699 294 750 51 7% 
£000 £000 £000 £000 %
Employee 263 88 262 (1) (0%) 
Property 0 0% 
Transport and Plant 1 0 0 (1) (100%) 
Supplies, Services and Admin 7 1 7 1 8% 
Payments to Other Bodies 10 0 10 0 3% 
Other 0 0% 
Gross Expenditure 280 89 279 (1) (0%) 
Income (398) (116) (378) 20 5% 
Net Expenditure (117) (27) (99) 18 (16%) 
£000 £000 £000 £000 %
Employee 982 363 981 (1) (0%) 
Property 0 0% 
Transport and Plant 4 1 3 (1) (25%) 
Supplies, Services and Admin 18 9 17 (1) (4%) 
Payments to Other Bodies 2 3 4 2 100% 
Other 0 0% 
Gross Expenditure 1,005 376 1,005 (0) (0%) 
Income (181) (10) (215) (34) (19%) 
Net Expenditure 824 367 790 (34) (4%) 
£000 £000 £000 £000 %
Employee 1,066 394 1,065 (1) (0%) 
Property 0 0% 
Transport and Plant 5 0 1 (4) (80%) 
Supplies, Services and Admin 22 7 24 2 9% 
Payments to Other Bodies 130 21 130 0 0% 
Other 0 0% 
Gross Expenditure 1,223 422 1,220 (3) (0%) 
Income (846) (196) (591) 255 30% 
Net Expenditure 377 226 629 252 67% 
Central Admin Support
Environmental Health
Legal Services/Trading Standards
Licensing
Planning
Page 191

Page 192

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status Service Summary Variance 2022/23
£000 £000 £000 £000 %
Employee 812 294 814 2 0% 
Property 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 5 2 5 0 0% 
Payments to Other Bodies 0 0% 
Other 0 0% 
Gross Expenditure 817 296 819 2 0% 
Income (74) 5 (73) 1 1% 
Net Expenditure 743 301 746 3 0% 
£000 £000 £000 £000 %
Employee 1,014 374 1,013 (1) (0%) 
Property 0 0 0 0 0% 
Transport and Plant 2 0 1 (1) (50%) 
Supplies, Services and Admin 5 5 7 2 40% 
Payments to Other Bodies 262 138 262 0 0% 
Other 0 0% 
Gross Expenditure 1,283 517 1,283 0 0% 
Income 0 0 0 0 0% 
Net Expenditure 1,283 517 1,283 0 0% 
£000 £000 £000 £000 %
Employee 2,064 789 2,064 (0) (0%) 
Property 0 0% 
Transport and Plant 3 0 1 (2) (70%) 
Supplies, Services and Admin 2,847 1,795 2,781 (66) (2%) 
Payments to Other Bodies 19 3 19 0 0% 
Other 0 0% 
Gross Expenditure 4,934 2,587 4,865 (69) (1%) 
Income (432) (92) (425) 7 2% 
Net Expenditure 4,502 2,495 4,440 (62) (1%) 
£000 £000 £000 £000 %
Employee 550 189 550 (1) (0%) 
Property 0 0% 
Transport and Plant 0 0 0 (0) (100%) 
Supplies, Services and Admin 0 0 1 0 400% 
Payments to Other Bodies 0 0% 
Other 0 0% 
Gross Expenditure 551 189 550 (1) (0%) 
Income (54) (12) (54) 0 0% 
Net Expenditure 497 177 496 (1) (0%) 
£000 £000 £000 £000 %
Employee 340 121 331 (9) (3%) 
Property 0 0 0 0 0% 
Transport and Plant 1 0 1 0 0% 
Supplies, Services and Admin 14 2 15 1 4% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 354 123 346 (8) (2%) 
Income (22) (16) (22) 0 0% 
Net Expenditure 333 107 325 (8) (2%) 
Transactional Services
Human Resources (including risk)
Information Services
Change Support
Communications & Marketing
Page 192

Page 193

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status Service Summary Variance 2022/23
£000 £000 £000 £000 %
Employee 1,263 530 1,283 20 2% 
Property 0 0 0 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 20 11 21 1 6% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 1,284 541 1,305 21 2% 
Income 0 0 0 0 0% 
Net Expenditure 1,284 541 1,305 21 2% 
£000 £000 £000 £000 %
Employee 332 101 313 (19) (6%) 
Property 0 0 0 0 0% 
Transport and Plant 1 0 1 0 0% 
Supplies, Services and Admin 3 0 3 0 1% 
Payments to Other Bodies 22 2 22 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 357 103 338 (19) (5%) 
Income 0 (23) (23) (23) 0% 
Net Expenditure 357 80 315 (42) (12%) 
£000 £000 £000 £000 %
Employee 242 42 236 (5) (2%) 
Property 219 24 219 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 51 31 52 1 2% 
Payments to Other Bodies 0 10 4 4 0% 
Other 0 0 0 0 0% 
Gross Expenditure 511 106 511 (0) (0%) 
Income (53) (58) (53) 0 0% 
Net Expenditure 458 49 458 (0) (0%) 
£000 £000 £000 £000 %
Employee 95 34 95 0 0% 
Property 1,306 354 1,315 9 1% 
Transport and Plant 1 0 1 0 0% 
Supplies, Services and Admin 54 8 54 0 0% 
Payments to Other Bodies 20 (0) 20 (0) (0%) 
Other 0 0 0 0 0% 
Gross Expenditure 1,475 396 1,485 9 1% 
Income (200) 0 (200) 0 0% 
Net Expenditure 1,275 396 1,285 9 1% 
£000 £000 £000 £000 %
Employee 1,308 465 1,291 (17) (1%) 
Property 264 43 274 10 4% 
Transport and Plant 16 4 16 0 1% 
Supplies, Services and Admin 248 120 255 7 3% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 1,836 632 1,836 (1) (0%) 
Income (25) (38) (59) (34) (137%) 
Net Expenditure 1,811 594 1,777 (35) (2%) 
Citizen Services
Performance & Strategy
Office Accomodation
Clydebank Town Hall
Libraries
Page 193

Page 194

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status Service Summary Variance 2022/23
£000 £000 £000 £000 %
Employee 358 110 333 (25) (7%) 
Property 3 0 3 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 35 10 35 0 1% 
Payments to Other Bodies 43 14 43 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 439 134 415 (24) (6%) 
Income (69) 0 (69) 0 0% 
Net Expenditure 371 134 346 (24) (7%) 
£000 £000 £000 £000 %
Employee 3,573 1,290 3,464 (109) (3%) 
Property 70 20 70 0 0% 
Transport and Plant 111 18 109 (2) (2%) 
Supplies, Services and Admin 1,982 386 2,021 40 2% 
Payments to Other Bodies 29 16 29 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 5,763 1,731 5,692 (71) (1%) 
Income (1,309) (63) (1,309) 0 0% 
Net Expenditure 4,454 1,668 4,383 (71) (2%) 
£000 £000 £000 £000 %
Employee 1,805 860 1,888 82 5% 
Property 164 66 165 0 0% 
Transport and Plant 2 1 2 0 0% 
Supplies, Services and Admin 21 8 21 0 0% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 1,992 934 2,074 82 4% 
Income (289) (52) (414) (124) (43%) 
Net Expenditure 1,703 882 1,661 (42) (2%) 
£000 £000 £000 £000 %
Employee 692 255 692 (0) (0%) 
Property 42 22 42 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 12 1 12 0 0% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 746 278 746 (0) (0%) 
Income (1,077) (449) (1,077) 0 0% 
Net Expenditure (331) (171) (331) (0) 0% 
£000 £000 £000 £000 %
Employee 2,125 805 2,131 6 0% 
Property 31 19 42 11 33% 
Transport and Plant 1 0 1 0 0% 
Supplies, Services and Admin 13 2 15 2 16% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 2,171 826 2,189 19 1% 
Income (71) (25) (71) 0 0% 
Net Expenditure 2,100 801 2,119 19 1% 
Arts and Heritage
Catering Services
Building Cleaning
Building Cleaning PPP
Facilities Assistants
Page 194

Page 195

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/23
CORPORATE SERVICES COMMITTEE DETAIL
PERIOD END DATE 31 August 2022
Total Budget
2022/23 
YTD Spend
2022/23 
Forecast
Spend
2022/23
RAG Status Service Summary Variance 2022/23
£000 £000 £000 £000 %
Employee 411 145 412 1 0% 
Property 0 0 0 0 0% 
Transport and Plant 2 0 2 0 0% 
Supplies, Services and Admin 3 2 4 1 26% 
Payments to Other Bodies 0 0 0 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 416 147 418 2 0% 
Income (20) (21) (21) (1) (6%) 
Net Expenditure 396 126 397 0 0% 
£000 £000 £000 £000 %
Employee 0 0 0 0 0% 
Property 0 0 0 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 0 0 0 0 0% 
Payments to Other Bodies 4,397 2,297 4,397 1 0% 
Other 0 0 0 0 0% 
Gross Expenditure 4,397 2,298 4,397 1 0% 
Income (758) 0 (758) 0 0% 
Net Expenditure 3,638 2,298 3,639 1 0% 
£000 £000 £000 £000 %
Employee 0 0 0 0 0% 
Property 2 (1) 2 0 0% 
Transport and Plant 0 0 0 0 0% 
Supplies, Services and Admin 80 37 80 0 0% 
Payments to Other Bodies 93 94 94 0 0% 
Other 0 0 0 0 0% 
Gross Expenditure 176 130 176 0 0% 
Income (87) (50) (87) 0 0% 
Net Expenditure 89 80 89 0 0% 
Facilities Management
Leisure Management
Events
Page 195

Page 196

Page 196

Page 197

WEST DUNBARTONSHIRE COUNCIL
REVENUE BUDGETARY CONTROL 2022/2023
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Annual Spend RAG Status
£000 £000 £000 %
Finance 1,398 1,429 32 2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Revenues & Benefits 2,103 2,147 44 2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Environmental Health 699 750 51 7% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Planning 377 629 252 67% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 4,502 4,440 (62) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This Service provides Building & Planning services
The main reason for the adverse variance is that income is lower than budgeted due to
cancelled or delayed building projects. The expected income shortfall has increased since P4
by a further £94k after a further review. This variance has been reported in previous months
but was being offset in part by savings on staff costs caused by vacancies, the staffing
vacancy savings have been removed in P5.
No action required
Overspend is anticipated
This service area provides general ICT support to the Council and also supports
transformational change and modernisation of working practices through technology
Supplies and Services is favourable due to computer licence costs projected to cost less than
budgeted.
None required at this point.
Underspend is projected.
The 3 Groups within this service (Food and Business Group, Environmental Pollution Group
and Community Health Protection Group) are responsible for all aspects of Environmental
Health work.
The main reason for the adverse variance is a reduction in expected income for pest control in
particular.
No action can be taken at this time
Overspend is anticipated
The service provided by this area deal with benefits, council tax and debt recovery.
No action is possible at this time.
Overspend is anticipated
Additional Covid-19 self-isolation grants are being paid by this service with the cost being
offset by additional funding. Vacancies being covered by overtime therefore targeted turnover
savings not being fully achieved.
The service provided by this area deals with Accountancy, Capital, Treasury, Reconciliations,
Cash Office and Municipal Bank
Main reason for adverse variance is full turnover savings are not being achieved, however this
is being offset by an increase in anticipated income.
The position continues to be monitored by management to identify any savings which may
help reduce this position
An adverse variance is likely
31 August 2022
Budget Details
Variance Analysis
Variance
Appendix 3
Page 197

Page 198

Total Budget Annual Spend RAG Status
£000 £000 £000 %
Budget Details
Variance Analysis
Variance
Catering Services 4,454 4,383 (71) -2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action A review of the vacancies and overtime position going forward is underway
Anticipated Outcome
Building Cleaning 1,703 1,661 (42) -2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Catering Services across WDC
Overall variance is favourable due to vacancies. Increased spend negates some of the
favourable variance due to a one off charge for the early termination charges for contract for
vending machines and a higher level of overtime than predicted due to the vacancies.
Overspend is anticpated
This service provides cleaning services across all council buildings
The reason for the favourable variance is the number of ongoing vacancies
None required at present
Underspend likely
Page 198

Page 199

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME - CORPORATE SERVICES COMMITTEE
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 5
Spend to
Date
Spend to
Date
£000 £000
Red
4 19% 45 2% 4 19% 3 0%
Amber
0 0% 0 0% 0 0% 0 0%
Green
17 81% 2,431 98% 17 81% 725 100%
21 100% 2,476 100% 21 100% 728 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Forecast
Variance Slippage Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
421 45 470 49 36 3 49 13 (36) 49
0 0 0 0 0 0 0 0 0 0
10,659 2,431 10,563 (96) 7,448 725 6,658 (791) (791) 0
11,080 2,476 11,033 (47) 7,484 728 6,707 (778) (827) 49
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
TOTAL EXPENDITURE
Projects are forecast to be overspent and/or significant delay to completion
Amber
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast stages in the project life cycle and
no issues are anticipated at this time
31 August 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects
at RAG
Status
% Project
Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects
at RAG
Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay to completion
Amber
Projects are either at risk of being overspent and/or delay in completion (although this is unquantifiable at
present) or the project has any issues that require to be reported at this time
Green
Appendix 4
Page 199

Page 200

Page 200

Page 201

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
Project Life Financials 9 0 0% 9 0 0%
Current Year Financials 3 0 0% 0 (3) -100%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 0 3 0% 3 3 0%
Current Year Financials 0 3 0% 3 3 0%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 33 0 0% 33 0 0%
Current Year Financials 33 0 0% 0 (33) -100%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Replacement of laptops, monitors and other ICT equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Replacement of laptops, monitors and other ICT equipment. No further spend anticipated.
Mitigating Action
None available at this time.
Anticipated Outcome
Replacement of laptops and ICT equipment
Legal Case Management System
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Requisition ICT Equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget remains unspent and is likely to be carried forward into FY 23/24.
Mitigating Action
Valuation Joint Board - ICT Refresh FY 22/23
Forecast End Date
Main Issues / Reason for Variance
Budget has been rephased from 2021/22.  The project could not proceed as originally planned as Officers are required to access the
office and hardware the system will run on and COVID-19 restrictions have prevented this.  The project will have to go back out to tender
following the upgrade to Microsoft 365.  The project will not be completed in this financial year. 
Mitigating Action
Legal to discuss impact of Microsoft 365 with ICT.
None available at this time.
Anticipated Outcome
Requisition of ICT Equipment.
Legal Case Management System
Anticipated Outcome
Project to be completed in 2023/24.
Planned End Date
Appendix 5
Page 201

Page 202

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 379 42 11% 425 46 12%
Current Year Financials 0 0 0% 46 46 0%
Project Description
Project Manager Arun Menon
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-30 31-Mar-30
Main Issues / Reason for Variance
Work continues on developments resulting in some spend in the current year.
Mitigating Action
None required.
Anticipated Outcome
Development of Workforce Management System.
Development of Workforce Management System
Project to develop the Workforce Management System.
Planned End Date Forecast End Date
Page 202

Page 203

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 50 43 86% 51 1 1%
Current Year Financials 7 0 0% 8 1 10%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 40 5 12% 40 (0) 0%
Current Year Financials 35 0 0% 35 0 0%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 30-Sep-23 30-Sep-23
Main Issues / Reason for Variance
The various claim forms and departmental reports have been reviewed and updated and the relevant online request forms were submitted to the
Digital Sub-Group to be converted to Online Achieve Forms.  The various claim forms and departmental reports have now been converted to
Online Achieve Forms and are in the process of being tested. Once complete, the supplier will take matters forward with their design team. An
anticipated timeline for completion of the project, taking into account the various stages i.e. development, testing, going live etc. will be drawn up
in conjunction with the supplier at that time.  Budget spend anticipated in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded version with PCI compliant telephone payment system.
Electronic Insurance System
Acquisition of a claims/incident management system supported by an electronic document management
system.
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Payment Card Industry Data Security Standard (PCIDSS)
Module would ensure that WDC were compliant with the current requirements of PCIDSS for card payments
without the need for numerous costly workarounds
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget was rephased to 2022-23 as version upgrade of the Council's cash receipting system is required beforehand and is currently underway.
Anticipated Outcome
Upgraded Electronic Insurance System.
Enhancements to Cash Receipting System
Main Issues / Reason for Variance
Budget was rephased to 2022-2023 as this is a number of mini projects and the first part is the version upgrade which is actively progressing.
After this upgrade we can move onto other enhancements which are anticipated to finish in September 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Enhancements to the cash receipting system including PCI compliant telephone payment system.
To enhance the cash receipting system in the way payments are made and allocated to back office by
increasing the level of security that is required for online payments made by customers
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Appendix 6
Page 203

Page 204

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Project Life Financials 60 5 8% 60 0 0%
Current Year Financials 25 0 0% 25 0 0%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Oct-22
Project Life Financials 5 0 0% 5 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Jackie Nicol Thomson
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager Gillian McNeilly
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
Delays in completion of required data cleansing prior to the upgrade have caused the start of the upgrade to be deemed too close to the financial
year end to risk disruption to preparation of the draft final accounts. The upgrade will be delayed until October 2022.
Cost of Living
To support Council and community organisations with capital costs for cost of living initiatives.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Working Group currently developing proposals for initiative.
Mitigating Action
None required
Anticipated Outcome
Initialive will assist with cost of living crisis
IFRS 16 Database
This is a system which will ensure that WDC has the correct level of information and adheres to correct
reporting of IFRS16 - Leasing. 
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The purchase of software to allow new accounting treatment of leases to be appropriately reported is on track. Full spend anticipated FY
2022/2023.
Mitigating Action
None required
Anticipated Outcome
Purchase of software for accounting for leases.
Mitigating Action
None possible at this time.
Anticipated Outcome
Development of Agresso system later than originally anticipated but within original budget.
Agresso development
The purpose of this project is to carry out an upgrade of the Agresso Finance System which was last
upgraded in 2015. The requirement to upgrade is to maintain a level of support available from Unit 4 who
have advised that support for older versions of the system is being reduced.
Planned End Date Forecast End Date
Page 204

Page 205

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Project Life Financials 53 13 25% 53 0 0%
Current Year Financials 33 0 0% 33 0 0%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 10 0 0% 10 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 15 4 24% 15 0 0%
Current Year Financials 11 0 0% 11 0 0%
Project Description
Project Manager Stephen Daly
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Review of service requirements & telephony functionality will inform works to improve citizen experience.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Improvements to Contact Centre telephony were completed as scheduled during 2021/2022.  Further works have been scoped and agreed for
improvement to Housing telephony, benefiting both residents and the Council.  A review of the out of hours service is currently being undertaken
including work to upgrade telephony.  Any works will also incur professional fees for necessary scripting works.  We are also exploring call
recording technology across all the Contact Centre telephony.  It is anticipated these projects will be completed during the financial year
2022/2023.
Mitigating Action
None required.
Telephone System Upgrade
To improve Housing Repairs telephone platform for incoming calls, providing improved Management
Information.
Anticipated Outcome
Preservation of Historic Site.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment Scotland) Rediscovering the Antonine
Wall project will be paid by the end of the financial year.
Mitigating Action
None Required.
Re -imagine Antonine Wall 
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment
Scotland) Rediscovering the Antonine Wall project which is also funded by the Heritage Lottery Fund.
Trainee solicitor in place. Budget will be fully spent.
Mitigating Action
None required at this time.
Anticipated Outcome
Solicitor support for Capital Projects, with full budget spend anticipated.
Solicitor Project Support for Capital Projects
Solicitor costs to directly support capital projects
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Page 205

Page 206

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Project Life Financials 421 232 55% 421 (0) 0%
Current Year Financials 91 3 3% 91 (0) 0%
Project Description
Project Manager David Main
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 3,987 1,185 30% 4,000 13 0%
Current Year Financials 1,662 (2) 0% 1,662 0 0%
Project Description
Project Manager Sarah Christie/Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 1,700 43 3% 1,590 (110) -6%
Current Year Financials 1,590 43 3% 1,590 0 0%
Project Description
Project Manager Michelle Lynn/ Sarah Christie
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
Heritage Capital Fund
Heritage Capital Fund.
Main Issues / Reason for Variance
Work is underway to progress furniture replacement at Dumbarton, Duntocher and Parkhall libraries during 2022/2023.  Budget of £0.1m has
been rephased to  next financial year for Dalmuir library as work is currently scheduled for 2023/2024.
Mitigating Action
None required.
Anticipated Outcome
Project carried forward to align with Asset Management programme.
Main Issues / Reason for Variance
Project in design phase and planning application submitted August 2022.
Mitigating Action
None available at this time.
Anticipated Outcome
Re-development of Glencairn House in Dumbarton High Street to a purpose built library and museum, within budget albeit later than originally
anticipated.
Anticipated Outcome
Project to be delivered on budget and within revised timescale.
Glencairn House
Re-development of Glencairn House in Dumbarton High St to a purpose built library and museum.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
None available at this time.
Transformation of Infrastructure Libraries and Museums
To improve performance and efficiency of Council's Libraries and Cultural Services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The original projected spend has been affected by internal and external delays due to the Covid 19 recovery, a reduction in the scope of the
Clydebank Town Hall project, a change in the delivery date for the Clydebank Museum at Clydebank Library during the contract award stage,
while the new Dalmuir Library and Gallery had to be rescheduled for approval in August 2021. Officers are now making progress to get projects
back on track, projects will still be delivered in full, and a review of optimism bias will be undertaken in the projections for 2022/23.
Mitigating Action
Page 206

Page 207

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Project Life Financials 40 0 0% 40 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Manager John Anderson
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 1,422 422 30% 1,422 0 0%
Current Year Financials 1,422 422 30% 950 (472) -33%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 60 50 83% 60 0 0%
Current Year Financials 17 7 40% 17 0 0%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Oct-22 31-Oct-22
Mitigating Action
None available at this time.
Anticipated Outcome
Technical aspect of the project is complete and WDC assisting with user testing. Delayed but on budget.
Internet of Things Asset Tracking
Asset Tracking.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Technical aspect of the project is complete and WDC are assisting with user testing. Delayed but on budget.
Anticipated Outcome
Most of capital allocated to HSCP will be used to review/replace the current case management systems and will be rephased in line with the
project plan. Supply chain delays may continue to impact delivery and spend.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Some replacement Chrome book orders have been received by schools. Uplift and disposal of old devices being scheduled. Planning for MOB
replacements to be issued to users but dependency on In Tune module of 365. Gathering inventory information for next batch of replacements.
Mitigating Action
Continue to escalate and meet framework suppliers to confirm delivery lead times.
Investigate other procurement routes as well as adjust the project scope to replace where stock allows.
ICT Modernisation
This budget is to facilitate ICT infrastructure and modernise working practices.
Mitigating Action
None required
Anticipated Outcome
New floor fitted in Alexandria Community Sports Hall.
Alexandria Community Centre Sports Hall re-flooring
Alexandria Community Centre Sports Hall re-flooring
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The Alexandria Community Centre Sports Hall continues to be utilised as COVID-19 vaccine centre during 2022/23 and the work will be
postponed until the last quarter of the financial year.
Page 207

Page 208

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Project Life Financials 1,297 241 19% 1,297 0 0%
Current Year Financials 1,297 241 19% 1,000 (297) -23%
Project Description
Project Manager Brian Miller/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 450 189 42% 450 0 0%
Current Year Financials 173 11 7% 150 (23) -13%
Project Description
Project Manager Dorota Piotrowicz/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 30-Sep-23 30-Sep-23
Majority of budget spent but delayed.
ICT Security & DR
The project is for the enhancement of security systems, server replacement and the update of corporate
applications to ensure compliance with 15/16 PSN requirements, to enhance the disaster recovery
capabilities of WDC.
Main Issues / Reason for Variance
Project spend relates to internal and external resources to implement new systems, processes and user training skills. Mailbox migration aspect
of the project delayed until cloud backup is implemented (procurement of backup in progress and target implementation is October 2022
following tendering committee approval). Implementation of device management functionality in 365 is on target to go live in September 2022.
Information governance work stream baseline review is complete and implementation of action plan is at planning stage. Recruitment of
resources to train end users and carry out mail migrations has started.
Mitigating Action
Continue to monitor the various work streams to accelerate aspects of the project where possible if suppliers can provide resource. Continue to
assess where a) internal skills have developed, b) external resource is needed for introducing new functionality in the future to inform future
bidding cycles and c) temporary recruitment/secondment is required.
Anticipated Outcome
Anticipated Outcome
Anticipate the majority of budget being spent this financial year but some works are planned for the last quarter of the year for Public Sector
Network (PSN) annual compliance submission.
365 Implementation
Project services to delivery Microsoft 365 Implementation including 3rd party supplier, training, technical
consultancy etc.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Storage Area Network (SAN) delivered and installation planning underway. Switch replacement in schools completed during the summer break. 
Switch replacement for Church Street at planning stage as required down time. Server replacement at scoping stage.
Mitigating Action
Monitor supply chain issues. Continue tendering processes and implementation stages for each project.
Page 208

Page 209

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
Corporate Services Committee : 2 November 2022
__________________________________________________________________________________
Subject: Various Grant Applications to Dumbarton Common Good 
1. Purpose of Report
1.1 The purpose of this report is to provide Members with details of three grant
applications to Dumbarton Common Good for consideration.
2. Recommendations
2.1 The Committee is asked to approve the renewal for a further 3 years of the
£36,000 annual grant to Bellsmyre Development Trust.
2.2 The Committee is asked to approve the permanent increase of £2,730 to the
existing grant paid to cover the cost of the annual Levengrove Fireworks
Display from 2023-24 and to note that prior approval has been given for the
increase in 2022-23. The Committee is also asked to approve future
increases in this budget to cover increased costs up to a ceiling of £20,000 at
which time a report will be brought to Committee seeking permission to
increase beyond the proposed ceiling.
2.3 The Committee is asked to note that an annual grant of £50,000 to be paid as
a contribution to the annual Pipe Band Championships held in Levengrove
Park, commencing 2023-24 will be included in the budget report to council in
March 2023.
3. Background
3.1 Dumbarton Common Good Fund grants are administered by the West
Dunbartonshire Council and are reported to the Committee as and when
applications are received.
3.2 The value of fund as at 31 March 2022 was £581,312.
4. Main Issues
Grant Applications to Dumbarton Common Good
4.1 At a meeting of West Dunbartonshire Council held on 27th November 2019
members agreed to provide an annual grant to Bellsmyre Development Trust
of £36,000 to cover three operational years from February 2020 until January
2023. Bellsmyre Development Trust are applying for a continuation of this
ITEM 15
Page 209

Page 210

arrangement for a further three years subject to the renewal of the service
level agreement which also expires in January 2023. Appendix A summarises
the aims of the group and advises on their current financial position.
Committee is asked to approve an extension of the grant payment at a
maximum of £36,000 per annum for the period from 1st February 2023 to 31
January 2026.
4.2 Dumbarton Common Good has provided an annual grant of £9,050 to fund
the annual Fireworks Display held at Levengrove Park. The Chief Officer for
Citizen, Culture and Facilities, has advised that the current grant is no longer
sufficient to cover the cost of the event and has requested that the budget be
increased by £2,730 to £11,780 which will be sufficient to cover the current
cost. As the 2022-23 event in question will occur only 3 days after the date of
the committee meeting prior approval was sought and given by the Chief
Executive and Convenor of the Committee. Members are asked to note that
prior approval for 2022-23 has been given and to approve the permanent
increase to the grant from 2023-24. Members are also asked to agree that this
budget can increase further in line with increased costs up to a ceiling of
£20,000 at which time a new report would be brought before members
seeking permission to exceed the proposed ceiling.
4.3 The Chief Officer for Citizen, Culture and Facilities has enquired whether
Dumbarton Common Good can provide funding as a contribution towards the
annual Pipe Bands Championship held in Levengrove Park. The council’s
Events budget is under pressure and the amount it currently provides towards
the Pipe Band Championships is insufficient to cover the current cost and a
loss of income being experienced by the event. The request is to provide
£50,000 per annum from 2023-24 financial year. This request will be included
in the 23-24 budget report for a council decision on its inclusion. Members are
asked to note this request will feature in the budget report to council in March
2023.
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications.
7. Financial and Procurement Implications
7.1 It is recommended that members agree to a 3 year continuation of the grant
funding arrangement of £36,000 per annum to Bellsmyre Development Trust
with a revised Service Level Agreement in place until 31 January 2026.
7.2 Approval has been agreed prior to the committee meeting to increase funding
to Annual Fireworks display by £2,730 with the increased annual grant being
£11,780 from 2022-23 financial year. It is recommended that members agree
to the permanent increase of £2,730 from 2023-24 and also agree to a ceiling
Page 210

Page 211

of £20,000 being placed on this budget to accommodate future increases in
running costs.
7.3 It is recommended that members note that an annual grant of £50,000 to Pipe
Band Championships commencing 2023-24 financial year will be included in
the budget report to Council in March 2023.
8. Risk Analysis
8.1 The Council must consider financial and reputational risks when considering
grant applications.  The financial risk is not only that the Council and Common
Good Fund remain within budget, but also that the organisations funded by
the Council and the Common Good Fund are both viable in the long term and
comply with the Conditions of Grant which cover issues such as
discrimination, health and safety, insurance, etc.
9. Equalities Impact Assessment (EIA)
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 Legal and Financial Officers have been consulted in preparing this report.
11.2 All organisations are consulted regarding recommendations of grant prior to
the report being submitted to Committee.
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the 5 strategic
priorities of the Councils Strategic Plan.
Laurence Slavin
Chief Officer, Resources 
Date: 17 October 2022
___________________________________________________________________
Person to Contact: Adrian Gray, Finance Business Partner,
Church Street, Dumbarton,
Email: adrian.gray @west-dunbarton.gov.uk
Page 211

Page 212

Appendices Appendix A: Details of Grant Application
Background Papers: Grant application summary information
Individual group grant applications
Wards Affected: Ward 3
Page 212

Page 213

Dumbarton Common Good Fund
for consideration by Corporate Services Committee on 02 November 2022
(2022/2023 onwards)
Organisation Purpose of organisation Purpose of grant Grant Requested and
Officer Recommendation
Bellsmyre
Development
Trust SCIO
To alleviate poverty in the
Bellsmyre Area through the
provision of facilities,
resources, activities and the
generation of opportunities for
all local residents
To partially fund ongoing costs to allow the
facilities and activities already established to
continue on an ongoing basis. This is a request to
extend existing arrangements for a further 3 years
from Feb 23 to Jan 26. The purpose and main
aims of Bellsmyre Development Trust are:
 Create a community organisation capable
of developing and representing the
community of Bellsmyre.
 Design and deliver a programme of
activities, events and opportunities for local
residents, in particular focussing on
Children, Families and Senior Citizens
 Improving the aesthetic and environmental
areas of the neighbourhood
 Relieving Poverty and Introducing services
to support families and individuals affected
by addictions
 Designing and building a Community
Hub/Centre fit for purpose in the modern
times.
Project annual cost: 
£371,800
Project annual income
£266,100 including
£127,500 self-generated
income.
Grant request: £36,000
per annum on an ongoing
basis with an updated
Service Level Agreement
developed.
Officer Recommendation:
Agree £36,000 per annum
for further 3 years to
January 2026.
Number of
members
How often does it meet Bank Balance and
Accounts Balance
Appendix 1
Page 213

Page 214

900-1000
registered
members, with
30 regular
volunteers
assisting;
including 10
volunteer
trustees
Board Meetings are bi-monthly
and the annual AGM takes
place in April each year
Accounts balance £62,472
per financial statements at
31st January 2022
(unrestricted). 
Current Bank Balance as at
14th October 2022 is
£70,181
Page 214

Page 215

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Corporate Services Committee : 2 November 2022
___________________________________________________________________
Subject: Council Workforce Plan 2017-2022:  Update & Annual Action Plan
2021/22
1. Purpose
1.1 The purpose of this report is to provide an update on the Council’s workforce
planning activity for 2021/22.
2. Recommendations
2.1 The Committee is asked to:
• Note progress during 2021/22 in delivering against the Council Workforce
Plan;
• Note the workforce profile as at 31st March 2022 and key changes;
• Note development of planned actions for 2022/2023,  linked to the People
First Strategy & 5 year plan and
• Note the Delivery Plans for each service include workforce annual action
plans.
3. Background
3.1 The Council Workforce Plan 2017-2022 was approved by this Committee on
29th November 2017, having been developed in line with the Council’s revised
Strategic Planning Framework.
3.2 The Council Workforce Plan is subject to ongoing monitoring and evaluation
to ensure that it remains effective in delivering required outcomes and
responsive to any changes in circumstances which subsequently arise.
This report contains 3 sections and associated appendices:
• The progress and achievements made over the last year (Appendix 1);
• The current workforce profile, examining any changes (Appendix 2);
and
• Future actions for Workforce planning 2022/23 linked to the People
First Strategy (Appendix 3).
3.3 Progress updates will be submitted to Corporate Services Committee on an
annual basis, outlining progress to date and actions for the year ahead. The
progress update at Service Level (Appendix 1) and the high level action plan
for 2022/23 (Appendix 3) are attached.
ITEM 16
Page 215

Page 216

3.4 Workforce annual action plans, for each Chief Officer Area are submitted to
the relevant Committee as part of the Delivery Planning process. Separate
reports are tabled at this committee. 
3.5 Whilst separate planning processes exist in relation to West Dunbartonshire
Health & Social Care Partnership (HSCP), appropriate alignment is in place to
ensure that Council employees working within HSCP are included and benefit
from all Council Wide initiatives and actions.  
4. Main Issues
4.1 The attached (Appendix 1) updates on the annual workforce planning action
plans for Services for 2021/22 under the areas addressed as follows:
• Addressing the gap between current workforce supply and predicted future
demand;
• Addressing the gap between current and required workforce capabilities;
• Improving resilience within teams;
• Ensuring clear, effective and stable organisational design;
• Addressing workforce diversity objectives; and
• Improving use of technology and new ways of working.
4.2 Key Achievements
4.2.1 As expected, the principle focus over the last 2 years has been the COVID-19
pandemic, our response and recovery, adapting to ever changing legislation
and guidance to ensure continued delivery of front line services and employee
support. This has resulted in many changes to service delivery, working styles
and individual service plans provide details of changes, challenges and
achievements. 
4.2.2 Services are reviewing and improving use of relevant data and the changing
environment to predict future demand and explore opportunities to deliver
services differently and more effectively. Where relevant, services considered
the opportunities and benefits of cross service working and shared services
as appropriate.
4.2.3 In 2021, West Dunbartonshire Council was named one of Scotland’s most
flexible employers thanks to a range of initiatives designed to improve
employees’ work-life balance. The award, from charity Flexibility Works,
ranked the Council in the Top 10. Judges were impressed with the high
volume of the Council’s workforce already working flexibly throughout the
organisation, and praised the fact that all employees have a right to flexible
working from their first day of employment with the application process
supporting this from pre-employment stage. This commitment to flexibility will
continue to adapt and evolve to support employees to work in a more agile
and flexible way.
Page 216

Page 217

4.2.4 In 2020/21, the innovative Fit for Future (FfF) service review process was
introduced to further improve service delivery and identify potential savings.
This programme uses a range of tools which encapsulate service design, and
employee engagement. This information is gathered and reviewed to identify
improvements, to ensure services are efficient and make best use of
resources. The FfF approach supports and promotes better use of data,
informed decision making, improved people practices and the identification of
opportunities for digital solutions.
4.2.5 Each review informs the next and these are going from strength to strength,
developing a robust and effective process across services. To date, 6 reviews
have been completed:
• FfF1 – Waste Services
• FfF2 – Working 4 U
• FfF3 – Repairs Contact Centre
• FfF4 – Procurement
• FfF5 – Building Standards
• FfF6 – Housing Voids & Allocations
A seventh FfF review is being conducted for Facilities Management and
Catering and this will be completed by the end of 2022.  
4.2.6 Surveys, self-evaluation and quality improvement exercises also continue to
provide beneficial insight into areas for enhancement and have informed
associated action plans. Services continue to work in a more cohesive
fashion, promoting a one council approach in projects such as Integrated
Housing Management System, Digital Transformation and Employee
Wellbeing.
4.2.7 In recent years the council has placed great emphasis in supporting the
development of the workforce, improving digital skills, embedding ‘be the best’
conversations, introducing skills passports and training plans whilst building
resilience and career planning into service plans. Now, working more
remotely, the need for these interactions is even more apparent and guiding
managers to support their teams remotely has been a focus and will continue
to be a priority.
4.2.8 The introduction of the Digital Skills Support Framework aims to ensure all
employees have access to the support and information they need to grow and
develop their digital skills both as an employee, for their role, and as a citizen
of Scotland. There has been a marked increase in usage of the online
learning platform (ilearn) and work continues around building and developing
its modules and capability, particularly around reporting and accessibility. Fit
for Future reviews continue to activate learning programmes were
appropriate.
4.2.9 With an increased number of employees currently working from home, the
continued development of online employee engagement practice is essential.
Page 217

Page 218

Trickle, a digital platform for employee engagement is being further developed
and informs new advances. It has been rolled out across 56 teams and
currently has 1316 users.   A programme of work is planned to promote
Trickle and increase usage across Council commencing in September 2022.
4.2.10 A full on-boarding review was intended however this was paused due to other
work priorities and resources. This project sought to review the systems and
processes around recruitment, from attracting the right candidates to
appointment and integrating and supporting a new employee into the
organisation. The intention being to create a positive inspiring, informative and
seamless journey from application to appointment and the first stages of
employment. Whilst initial work commenced, this project has now been
incorporated into the People First Strategy and associated 5 year plan
commencing in 2022 with a spotlight on recruitment and on-boarding in years
1 and 2. An induction App was also created to push out helpful organisational
information that would assist employees in the first few months. Further
promotion, development and analysis of use is required.
4.2.11 Since its’ launch in late 2020, the workforce planning console has been
successfully rolled out to the senior management network and continues to be
the key source of workforce information. This allows managers to see their
workforce information using real time data which has set West Dunbartonshire
Council ahead of others, has supported better workforce planning and
understanding whilst removing the need for report requests as they have been
replaced by the console. Continuous improvement allows for feedback and
development of this console with further developments being undertaken this
year.
4.2.12 Throughout the Pandemic the Organisational Development, Change and
Digital section has continued to adapt, redesigning how support is provided to
managers and employees. The wider implications for the working environment
following the pandemic, and innovations in technology, mean this is a key
turning point in how we develop and deliver learning for the organisation. 
Significant work has been undertaken to redesign all internal delivery
workshops and programmes to enable virtual facilitation, and incorporate
latest practice and research including learning and support for digital skills,
hybrid working and wellbeing. Additionally, work is also underway to review
and update the behavioural frameworks, ACHIEVE and People Management,
in line with current thinking and practice, including integration of digital skills
and modern leadership. 
4.2.13 Building on the positive equalities work already demonstrated such as flexible
working and disability confident, a detailed action plan has been developed
and is being progressed. This ambitious plan sets out how the equalities
actions including how the responsibilities under the Public Sector Equality
Duty can be better met. The vision is to create and promote West
Dunbartonshire Council as an inclusive organisation that reflects the wider
community. The action plan straddles many facets, including data and system
development, communication, learning and development, policies and
Page 218

Page 219

procedures with a focus to refine, ensure continuous review and
improvement, reducing and removing barriers to employment for minority
groups and implementing positive action.  This year actions focused on data
collection  and verification with the Be Seen, Be Heard campaign, Improving
information on our intranet and mandatory training, signing up to the Violence
& Harassment Treaty and being part of the Equally Safe in Practice Pilot
scheme. 
4.2.14 With a revised approach to supporting employee wellbeing implemented in
2019/20, the focus through 2020 - 2022 has been to consolidate the key
changes made to the infrastructure of the Employee Wellbeing Group and the
associated communication channels thereby realising the benefits brought by
these changes.  This included but was not limited to clearer lines of
communication through the Wellbeing Advocate and Wellbeing Manager
groups, to ensure the right support was available to employees at the right
time. The pandemic highlighted the importance of continuing to support
employees’ mental health and, as a result, a rolling programme of learning
opportunities, with targeted wellbeing content, were provided that enabled
employees to reflect on and build their resilience during what was a
professionally and personally challenging time. There have been welcome
improvements in the Local Government Benchmarking Statistics related to
attendance which reflects the work in this area and in 2021/22 79% of
employees stated they felt valued by the organisation.
4.2.15 Employee engagement has been key in driving the employee wellbeing
agenda forward with feedback from Wellbeing Advocates, Trickle (the
employee engagement app) and pulse surveys informing the range of
supports that were available. The introduction of the Winter Wellbeing Toolkit
and the Wellbeing Round ups have provided a clear single point of reference
for employees to access resources that support their physical and mental
wellbeing as well as offering learning opportunities to support the different
ways of working that have been adopted over the last 17 months. 
Additionally, the last year has seen employees being further encouraged by
senior leaders to take small and important steps to take care of their
wellbeing. Blogs from Chief Officers and the Chief Executive have stressed
the importance of employees taking regular breaks, getting away from
computer screens and working flexibly where possible to highlight that the
Council values employees and the work they do.  This work contributed to the
Council Flexible Employers Award in 2020/21 and being shortlisted for Best
Health and Wellbeing Strategy in the UK wide HR Excellence Awards.  
4.2.16 Full details of the progress made against workforce planning actions across
Services are contained in appendix 1.
4.4 The current workforce profile,
4.4.1 The workforce profile as at 31/3/22 is attached in Appendix 2, with
comparisons made against the previous year and commentary on trends. 
The main observations are detailed below:
Page 219

Page 220

4.4.2 When compared to the same period last year, there has been a headcount
reduction of 27 across the council. This change is accounted for by a
reduction in fixed term contracts of 25. Although there was an increase of 17
permanent contracts, the reduction also stems from 19 less apprenticeships.
Reviewing the comparison data the overall workforce has steadily declined
with the bulk of the reductions in Supply Distribution & Property and within
Teams in the HSCP, Community care and Mental Health, Addictions and
Learning Disabilities.
4.4.5 There has been a continuation of growth in permanent employment, which is
a positive development, providing security and stability in times of uncertainty.
This is however likely to change in the future as monitoring of the workforce is
indicating further reductions in headcount and both permanent and temporary
contracts.
4.4.6 The overall sex profile remains largely unchanged with an overall split of
27.1% male and 72.9% female.
4.4.7 There has been a 4.9%increase in turnover from 8.3% last year to 13.2%.
Between 2016 and 2018, the turnover was between 8.6 and 8.7%, this
reduced to 8% in 18/19 and further reduced to 7.9% in 19/20. The Pandemic
and turnover in vaccination centres contributed to this. 
4.4.8 This year the data showed that there is an increase in the percentage of
employees working past the age of 65 (3.9% to 4.3%) and has steadily
increased over the last 3 years, supporting the national profile of employees
choosing to work longer for various reasons. The flexible working practices
available in the council support this through flexible retirement, more flexible
or part time working arrangements, retaining experience to support workplace
transition.
4.5 Workforce Planning Actions for 2022/23
4.5.1  Commencing in 2022/23, a 5 year People First Plan has been developed
focusing on key improvements of the Employee Life Cycle with spotlights on
the following:
• Year 1 – Recruitment
• Year 2 – On Boarding
• Year 3 – Development
• Year 4 – Retention
• Year 5 – Recognition
4.5.2 The People First Strategy will build on work already undertaken, analysing all
aspects of recruitment from attracting candidates to integrating a new
employee into the organisation and demonstrating our positive culture whilst
at the same time incorporating the aspects of the Fair Work Convention. Part
of this project will involve influencing how the Council is viewed and rated as
an employer in order to attract and retain key skills and provide a workforce
Page 220

Page 221

which can meet our service delivery requirements. This is paired with the
development work, embedding and continuing to improve the exit interview
process providing insights into the environment within services. Trends and
feedback from this work will identify and inform future actions. 
4.5.3 An increased focus will be on workforce planning actions which facilitate the
achievement of the People First Strategy concentrating on supporting the
internal and attracting the external recruitment markets, increasing and
devising employee development opportunities, succession planning and
development of talent pools and career development paths with a focus on
increasing the diversification of our workforce.
4.5.4 The Council is currently developing a new 5 year Strategic Plan with Service
Delivery Plans aligned to this. Workforce Actions plans will be embedded into
service delivery plans and be featured under the Priority ‘Our Council’ and
reported within Service Delivery plans mid and end of year.
4.5.5 In order to simplify the reporting and support the considerations around
workforce planning in line with the People First Strategy the Workforce
Priorities have been revised to 4 for 2022/23 as follows:
1. Our People (Workforce Profile) - Ensure resilience and engagement of
the workforce.
2. Recruitment & Retention - Current and predicted future workforce gaps
are addressed and core skill sets retained.
3. Structure & Roles - Service Structure and delivery model/s are stable
(robustly supported by job evaluation and governance), fit for purpose and
future requirements;
4. Skills & Capabilities - Current and future skills gaps and capabilities are
addressed.
Resilience (including continued Covid recovery), equalities and improved use
of technologies and new ways of working remain imperative and will therefore
be considered within and across the 4 priorities.
4.5.6 Appendix 3 provides further detail in relation to the revised workforce planning
Priorities and their aims with a high level Workforce Plan linked to the 5 Year
People First Strategy. Work will be undertaken with Services to ensure these
initiatives are considered within their workforce plans and reflected in service
specific actions. Cognisance will be taken of service level feedback in relation
to activity and outputs of the People First Plan to inform the development and
implementation of future actions ensuring service needs are met.
4.5.7 With the workforce planning console embedded into service planning
processes, this year will focus on continuous improvement of data and
improving the organisations future focus with the incorporation of finance
data, concentrating also on projective data, leavers, recruitment and equality
information.
Page 221

Page 222

4.5.8 The Workforce Planning Framework will be reviewed in order to simplifying
processes and further embed key workforce planning strategies. Guidance to
managers will support this to further enable the workforce planning function. 
4.5.9 The Fit for Future Reviews programme will continue across services,
supporting and promoting better use of data, improved decision making and
better people practices, fully utilising existing systems and technologies to
improve service delivery and improving services for our citizens.
4.5.10 Continuous improvement initiatives, such as Lean six sigma, service design,
coaching and mentoring and leadership development have been successfully
embedded and will continue as core organisational deliverables. Services will
continue to promote and engage in cross organisational working, and explore
the opportunities that this provides, including the potential for retraining of
employees into other areas. To support current budget gaps and future proof
the plans for service delivery, succession planning and talent management
will be key in further supporting this.
4.5.11 A significant area of development will be the digitalisation programme for the
organisation, managed through the Digital Transformation Board and chaired
by the Chief Officer for People & Technology. Digital developments have
increased tenfold with the COVID pandemic. The work already carried out in
this area greatly assisted with employees benefiting from improvements to
their digital literacy over recent years. All employees and Elected Members
working from home during the pandemic have benefited from the launch of
online collaboration tools such as MS teams, Zoom etc. and this will continue
to improve and evolve with the rollout of MS365.
4.5.12To ensure employees are not digitally excluded, the focus on digital literacy
and skills will continue. The already highly successful Excel and Outlook
courses provided by West College Scotland continues  supporting improved
data usage, understanding and promoting new and efficient ways of working.
The Digital Skills Support Framework will also expand this to ensure every
employee has access to digital skills support and information.
4.5.13The organisational culture and environment had changed markedly during the
preparation to move to offices of the future. This has continued to evolve and
improve in the last 2 years and will continue with a focus on wellbeing,
working from home, employee engagement and promotion of more flexible
working styles. As a forward thinking, innovative and creative council, we will
continue to promote agile working where possible and support employees and
managers across all service to embrace and embed the various flexible
working options. As at the beginning of September 2022 7.15% of employees
were working remotely, 6% classed as mobile between office, sites and home
and 12.46% Flexibly at different locations. More office based employees are
now working remotely and all employees have the opportunity for more
flexible styles of working. It does however remain imperative that employees
continue to come together for collaborative working face to face when
Page 222

Page 223

required.
4.5.14 Monitoring the changing working environments will continue as employees are
supported to work from various locations, more flexibly whilst balancing their
work and personal commitments. This is considered essential not only in
supporting employee’s wellbeing but also key to improved productivity.
4.5.15 Continued support of employees in a more virtual environment using trickle,
webinars, on line training, surveys, employee forums and support to ensure
that employees feel engaged, supported and valued will continue. Peer
support groups/communities have been developed to allow for collaboration
and networking e.g. wellbeing advocates and MS Teams ambassadors
4.5.16 Communication frameworks changed and evolved to support the organisation
through the pandemic. This infrastructure will continue to be utilised to
improve communication frameworks for national and local messages,
improving the information transfer across the organisation and ensuring the
workforce is well informed
4.5.16 The BAME profile has been identified as an area of focus for the Council’s
equality outcome to ‘attract more diverse talent’ by reviewing policies and
practices to ensure that there are no barriers to entering employment for
these groups as set out in the Equalities Mainstreaming report. A Respect at
Work Policy is being developed with key stakeholders in relation to Bullying,
Harassment, Discrimination and Victimisation and feeding into a Resolution
Framework planned for later in the year.
4.5.17 The Equalities agenda will focus on the Equally Safe at Work (ESAW)
programme, an innovative employer accreditation programme to address sex
inequality and violence against women and girls. Its aim is to support
employers in reviewing workplace culture and ensuring that policies and
practices are enhanced to address the barriers that women face at work. With
4 levels of award from Development to Gold the Council will commence work
towards Foundation level by July 2023.
4.5.18 In 2019/20 a verification exercise was carried out to understand the
composition of the workforce using the Workforce Management system. In
order to increase reporting, a further exercise including a manual, paper
exercise is planned for this year, previously delayed due to the Pandemic. 
4.5.19 The Council has held the Armed Forces Gold Award for actions in support of
Armed Forces, reservists and their family members since 2019. The Council
will be due to re-validate the gold award in 2024 however actions to further
support this community will be considered within our People First Strategy
and equalities work including encouraging the recruitment and retention of
Armed Forces Reservists and their family members. A fuller report detailing
activity around this topic is scheduled for October Council Meeting. 
Page 223

Page 224

4.5.20 The main vehicle for pushing Service Redesign programmes is the Fit for
Future Programme but this is also supported by the Automation Team and
Digital Transformation Board. The introduction of MS365 will bring many
opportunities and access to tools that services will require support with to
ensure they can maximise benefits from the available applications.  Service
managers are reviewing workforce plans, structures and digital solutions to
support service delivery and these are supported by the People & Change
team in a number of ways such as change management, project support,
training, automated forms, service design, employment advice and
recruitment.
4.5.21 Now integrated into the organisational priorities, the Employee Wellbeing
Strategy continues to focus on priority areas, responding to the needs of the
organisation. There will be regular progress reports to PMRG and JCF
including monitoring the impact of the resulting actions.
4.5.22 Full details of the 2022/23 High level action plan are attached as Appendix 3.
5. People Implications
5.1 Integration of workforce planning within wider organisational planning
processes ensures that workforce issues are effectively identified and
addressed. This supports the Council’s commitment to its’ employees in
relation to all aspects of their employment, ensuring that employees’ needs
are met and that efficient and modern services are effectively delivered both
now and in the future.
6. Financial and Procurement Implications
6.1 There are no additional financial or procurement implications associated with
this report. There are funding streams associated with the initiatives
mentioned in this report but these are already secured.
7. Risk Analysis
7.1 A robust approach to workforce planning ensures that the Council identifies
current and future needs and identifies potential risks to the council at an early
stage. This proactive approach allows strategies and policies to be developed
that ensure the continued delivery of best value services.
8. Equalities Impact Assessment (EIA)
8.1 A full EIA is not required in relation to the Council Workforce Plan as
individual assessments will be undertaken in relation to each area of work
referred to as it is progressed.
Page 224

Page 225

9. Consultation
9.1 The Strategic Leadership Group have been involved in the development of
the plan through preparation of the Delivery Plans and this report and
associated appendices have been provided to the  relevant trade unions on
7th October 2022. Further consultation will take place in relation to the future
review of the Workforce Planning Framework with the Joint Trade Unions. 
10. Strategic Assessment
10.1 This contents of this report and the workforce planning process supports the
Council’s aim to make the best use of both financial and human resources
resulting in a positive impact upon service provision.
Victoria Rogers 
Chief Officer - People & Technology
Date: 4th October 2022
Person to Contact: Lisa MacGregor, People and Change Partner
16 Church Street, Dumbarton
Tel: 07949800801
Email: Lisa.MacGregor@west-dunbarton.gov.uk
Appendices: Appendix 1 – Council Workforce Plan Progress update
2021/22 
Appendix 2 – Workforce Profile 31st March 2022
Appendix 3 – High Level Workforce Action Plan –
2022/23
Background Papers: Council Workforce Plan 2017-2022
Strategic Lead Area Workforce Plans 2017-2022
Strategic Workforce Planning Framework
Wards Affected: None
Page 225

Page 226

Page 226

Page 227

Appendix 1 - Corp- WFP- 2021-22 – Summary of Service Actions
(As at 31st March 2022)
Overview of Key Successes Against Actions.
People & Technology  - Victoria Rogers, Chief Officer:
• Workforce Management Console/Fit for Future Reviews - Supporting and promoting better use of data, improved decision making and better people practices is being
considered as part of the close working between Automation team and the Digital team. All Fit for Future reviews supported by ICT.  Ideas submitted re HR Console
and ICT formed part of the testing phase.
• Continued to review structures and role profiles across HR Connect and Payroll teams - Reviewed and considered on an ongoing basis and actively addressed through
a range of measures.
Supply, Distribution & Property – Angela Wilson, Chief Officer:
• Implemented changes to the school estate
• Deliver the allocated General Services Capital Investment Programme project scheduled for 2021/22
• Review current and future staffing requirements to ensure delivery of the HRA Capital Investment Programme for 2021/22 - Future staffing requirements assessed for
Building Services in line pipeline of known projects
Housing & Employability – Peter Barry, Chief Officer
• Develop appropriate teams to deal with emerging service demands around poverty and social inclusion and Parental Employability Support to address child poverty -
Employability partnership established and engaged a number of organisations to provide support for delivery of the Parental Employability Support Fund set within the
context of a three year plan to deliver the ‘No One Left Behind agenda’.
Citizen, Culture & Facilities – Amanda Graham, Chief Officer:
• Work with Organisational Development & Change (OD&C) to develop input and training to address skills gaps in particular skills to support new digital technologies
being used in service delivery - Increase in numbers accessing i learn modules.  Opportunities to upskill colleagues in digital technologies will continue into 22-23
and be supported by the roll out OD&C digital skills framework.
• Continue to roll out Future Leaders programme to those who have identified relevant training needs - New Leadership programmes such as Quantum have been
1. Addressing the gap between current workforce supply and predicted future demand
Strategy
Continue to implement the outputs of service reviews to address gap taking cognisance of opportunities to realise savings through voluntary turnover and consideration of
management spans of control.
Appendix 1
Page 227

Page 228

shared throughout service with those applicable/able to apply/access the relevant learning opportunities.
Regulatory & Regeneration – Alan Douglas, Chief Officer (Previous Peter Hessett)
• Continue to support culture of continuous improvement, developing quality improvement skills across middle managers - Staff are encouraged to participate in Team
Leader/ Management courses - Quantum Leadership, using new skills in terms of current positions and transferring skills to the Team.  Team Leaders/ Co-ordinators
have participate in Team Leader and Manager Sessions throughout the year. A number of Team Leaders/ Co-ordinator have applied for the Quantum Leader course in
2022/23.
• The Building Standards team participates in the Fit for Future Review in August 2021 – November 2021 and are presently implemented the recommendations of the
Review through an Improvement Plan.
• Exploring opportunities for cross organisational working - Considered but unable to share resources as all staff resources fully utilised due to Covid-19 pandemic.
Resourcing - Laurence Slavin, Chief Officer:
• Proactive identification of opportunities to develop the workforce -Considered as part of Be-the-best conversations and facilitated where vacancy arises though the
range of organisational policies
• Continue to support  culture of continuous improvement, developing quality improvement skills across middle managers-  Reviewed and considered on an ongoing
basis as part of various improvement projects across business support
Education & Early Learning – Laura Mason, Chief Officer:
• Managed actions from early years expansion working group
• Concluded induction of Early Years staff recruited through expansion
• Develop opportunities for secondment and work experience in ASN and specialist settings -Opportunities developed in line with ASN strategy with rollout of
opportunities continuing into 22-23
• Develop Leadership Pathways Model aligned to Professional Standards - Pathways developed and roll out continues.
Roads & Neighbourhood, Gail MacFarlane, Chief Officer:
• Develop service delivery model that meets the challenges caused by climate change, including extended growing season and more extreme flooding events in place -
further evaluation and future scanning to commence.
Page 228

Page 229

2. Addressing the gap between current and required additional workforce capabilities
Strategy
Continued review and implementation of associated training plans to enable capabilities to be developed within existing workforce
Overview of Key Successes Against Actions.
Overview of Key Successes Against Actions.
People & Technology - Chief Officer Victoria Rogers:
• Continue to utilise and embed Service design/Lean/Six Sigma skills
• Support Digital Transformation implementation - ICT have instigated and/or contributed to several digital transformation projects including HR Console, 3 Internet of
Things (loT) pilots, Full fibre infrastructure investigations and service changes projects such as IHMS, National Criminal Justice and Renton Primary school.
• Build succession planning, explore and initiate workforce shadowing/ transfer opportunities across P&T
• Continue to develop data analysis skills in People &Change  team with a view to fully utilising existing systems/technologies
• Current and future staffing requirements continued to be reviewed on an ongoing basis as part of various improvement projects across business support.
• Strengthen skills levels within the Automation Centre of Excellence (CoE) - Measures continue to be put in place to strengthen automation CoE.
Supply, Distribution & Property – Angela Wilson, Chief Officer:
• Further develop leadership skills within services in line with the People Framework to support the changing remits and spans of control - Training provided where
required to ensure staff/managers have appropriate skills and discussed at the Be the Best Conversations as part of  support, training, retention and succession
planning. Regular management team meetings and discussions undertaken to identify support needed.
Housing & Employability – Peter Barry, Chief Officer:
• Review development needs to support new ways of delivering services to ensure employees are equipped to work effectively - Established methods to ensure the
teams are up to date with the knowledge and information required to deliver our services. Equipped people to work remotely and trained in the use of digital
platforms to ensure maintained service provision.
Regulatory & Regeneration – Alan Douglas, Chief Officer (Previous Peter Hessett)
• Ensuring staff are adequately trained on changed legislation - Changes as a consequence of Brexit have been limited.  Emergency legislation and subsequent updates
introduced in response to Covid implemented in full. All staff are fully trained on changing legislation.
Resourcing - Laurence Slavin, Chief Officer:
• Build career paths that develop breadth of experience and depth of expertise at all levels by creating professional development frameworks and practical training
opportunities - Reviewed and considered on an ongoing basis as part of various improvement projects across business support.
Education & Early Learning – Laura Mason, Chief Officer
Page 229

Page 230

• Review role profiles to ensure that they accurately reflect ‘one team’ approach that fosters cross skills development, resilience within teams and continuing
development/broadening of employee skill set.
• Ensure that through the recovery programmes for Equity for Excellence, secondment opportunities are provided to employees that enable opportunities for increased
service resilience, talent development and succession planning.
• Develop CLPL programme reflecting current needs of workforce post pandemic – digital learning and technologies, wellbeing, Mental health supports, counselling and
coaching.
Roads & Neighbourhood, Gail MacFarlane, Chief Officer:
• Continue to support culture of continuous improvement, developing quality improvement skills across middle managers - i-learn courses complete.
3. Improve resilience within teams
Strategy
Develop and implement training plan in relation to critical roles
Overview of Key Successes Against Actions.
People & Technology  - Victoria Rogers, Chief Officer:
• Continued review of capacity across HR Connect and Payroll in line with process improvement, developments and business as usual to identify opportunities for
building resilience - Reviewed on a regular basis as part of Be the best conversations and wider process improvement work.
• Continued implementation of a one team approach ensuring cross skilling and development plans in Strategic HR team to aide team development.
• Support implementation of Employee Wellbeing Strategy including providing representation on Employee Wellbeing Advocate and Managers Group and Employee
engagement - Undertaken on a regular basis as part of Be the Best conversations and attendance on the Employee Wellbeing group.
• Support implementation of Employee Wellbeing Strategy including providing representation on Employee Wellbeing Advocate and Managers Group and Employee
engagement - Undertaken on a regular basis as part of Be the Best conversations and attendance on the Employee Wellbeing group.
Supply, Distribution & Property – Angela Wilson, Chief Officer
• Embed ‘Be the Best’ conversations into organizational culture to ensure opportunities exist to recognise employee contribution, employee wellbeing and learning and
development to address improvements identified in the Employee Survey - Further work in 22/23 to progress across Building services. Be the Best conversation are a
continual process. Weekly team meetings and regular conversations where policy, procedures, process, guidance, learnings, wellbeing, feedback, recruitment,
retention, trainings, succession planning etc.
Page 230

Page 231

Housing & Employability – Peter Barry, Chief Officer:
• Develop resilience plans that respond to ongoing and future challenges relating to COVID 19 - Individual revised working practices due to covid and risk assessments
for all aspects of housing operations functions. Ongoing review of working practices across service underway and a range of short term working groups. Staff guide
developed to include management contact details, links to Health &Safety and range of procedures and risk assessments. Contact arrangements established in
emergency situation.
Regulatory & Regeneration – Alan Douglas, Chief Officer (Previous Peter Hessett):
• Develop mentoring and training within teams-  a continuous activity which is supported by the Be the Best conversations
• Embed ‘Be the Best’ conversations into organisational culture to ensure opportunities exist to recognise  employee contribution, employee wellbeing and learning  and
development - now embedded in all services and employees actively encouraged to attend in service and external training where appropriate.
Resourcing - Laurence Slavin, Chief Officer:
• Continue support implementation of Employee Wellbeing Strategy including providing representation on Employee Wellbeing Advocate and Managers Group.
• Embed ‘Be the Best’ conversations into organizational culture to ensure opportunities exist to recognize employee contribution, employee wellbeing and learning and
development - Reviewed and considered on an ongoing basis.
Education & Early Learning – Laura Mason, Chief Officer:
• Continue Implementation of leadership and management development framework in Early Years which enables collaborative working and sharing/celebrating of good
practice - Ongoing process to support leaders in ELC.
• Develop skillset of range of Children’s Services Staff to ensure it reflects service needs - All staff have undertaken a range of Career Long Professional Learning (CLPL)
as well as multi-agency training and national presentations. There is more to be undertaken in the coming term.
• Develop CLPL programme to reflect needs of staff supporting ASN and inclusion; reflecting national ASN review.
Roads & Neighbourhood, Gail MacFarlane, Chief Officer:
• Continue to support the implementation of the Employee Wellbeing Strategy including providing representation on Employee Wellbeing Advocate and Managers Group.
- Departments are represented on relevant working groups.
• Embed ‘Be the Best’ conversations into organizational culture to ensure opportunities exist to recognise employee contribution, employee wellbeing and learning and
development. - embodied into the Department’s culture.
Page 231

Page 232

4. Ensuring clear, effective and stable organisational design
Strategy 
Planned service reviews within and across Strategic Lead Areas
Supporting new ways of working and service delivery 
COVID specific actions 
Overview of Key Successes Against Actions.
People & Technology  - Chief Officer Victoria Rogers:
• Supporting different work styles to best support home working and social distancing in line with COVID government guidance.
• Improved communication frameworks with employees and managers to translate the national messages and government guidance.
• Increased on line training provision for policy and practice to best support managers and employees as the organisational environment changes. Webinars, on line
training.
Supply, Distribution & Property – Angela Wilson, Chief Officer:
• Full Implementation of revised Asset Management Structure.
Housing & Employability – Peter Barry, Chief Officer:
• Supporting key staff to apply for and secure external funding – using National programmes proposal to develop skills through Skills Development Scotland funding.
Programmes awarded: Modern Apprenticeship; Foundation Apprenticeship; Employability Fund; Pathway Apprenticeships and Transitional Training Fund.
Education & Early Learning – Laura Mason, Chief Officer:
• Continue Implementation of a range of leadership models to support the development and opportunities available to employees.
• Support service redesign reflecting growing need to support disengaged and Interrupted Learners - Re design well underway with Engaging learners pathways and
expanded IL service in place. Planning for Choices extension well underway.
Page 232

Page 233

5. Addressing workforce diversity objectives
Strategy
Develop and implement action plans in relation to the following:
. Increase diversity in the Council workforce 
. Reduce the disability pay gap 
. Decrease occupational segregation 
. Outcomes of the Equal Pay Audits   
Overview of Key Successes Against Actions.
P&T  - Chief Officer Victoria Rogers:
• Data verification exercise – delayed due to personnel changes and will commence in September for completion early 2023
• Devise equalities actions.
• Annual equalities monitoring report completed.
Supply, Distribution & Property – Angela Wilson, Chief Officer:
• Consider and implement more flexible ways of working where possible –Full review of workstyles with many staff moving to remote or flexible where able.
Page 233

Page 234

6. Improved use of technology and new ways of working
Strategy
. Implement Workplace of the Future Strategy 
. Develop and implement workforce and organisational development solutions
Overview of Key Successes Against Actions.
People & Technology  - Chief Officer Victoria Rogers:
• Utilise and support the development of the Workforce Management console to better inform decisions and service delivery plans
Housing & Employability – Peter Barry:
• Team continues to be provided with training and development to enable them to fully utilize IHMS and other systems- Facilitated drop in sessions for staff, will be
reviewed thereafter for effectiveness/uptake.
Regulatory & Regeneration – Alan Douglas, Chief Officer (Previous Peter Hessett)
• Further improve the agility and flexibility of officers by provision of handheld mobile technology and the associated training- being explored.
Resourcing - Laurence Slavin, Chief Officer:
• Strengthen skills levels within the Automation Centre of Excellence (CoE) by regular skills development and retrospectives.
Page 234

Page 235

Appendix 2 – Workforce Profile – 31st March 2022
Table 1.1 below relates to the year-end workforce profile as at 31st March 2022 and examines changes in that profile over time.
1. Headcount
Table 1.1
When compared to the same period last year the headcount has decreased by 27 overall. This is due to reductions of 19
apprenticeships and 25 fixed term contracts but an increase of 17 permanent contracts. The casual/supply pool headcount
has decreased by 120.
Headcount Apprentice Fixed-Term Permanent Total Casual Invigilators
Citizen Culture & Facilities 1 60 634 695 9 0
Education 8 104 958 1070 39 42
Housing & Employability 0 68 275 343 2 0
People & Technology 0 6 100 106 0 0
Regulatory & Regeneration 0 11 106 117 4 0
Resources 0 15 224 239 0 0
Roads & Neighbourhood 15 23 349 387 37 0
Supply, Distribution & Property 29 9 381 419 0 0
Vaccination Centre Team 0 10 2 12 7 0
Chief Exec Office 53 306 3029 3388 98 42
Child Health Care & Criminal Justi 0 20 247 267 17 0
Community Health & Care 0 13 955 968 40 0
Finance & Resources 0 1 4 5 0 0
Mental Health Addiction & Learn 1 14 142 157 0 0
Strategy, Planning & Health Impr 0 1 24 25 0 0
Health & Social Care Partnershi 1 49 1372 1422 57 0
Strategic Management 0 0 13 13 0 0
Local Government Employees To 54 355 4414 4823 155 42
Education (Teachers) 0 172 921 1093 224 0
Council Wide Total 54 527 5335 5916 379 42
Appendix 2
Page 235

Page 236

Table 1.2 shows this year’s figures compared to the last 4 years and illustrates a continuing reduction in apprenticeship roles
returning to figures lower than 2018. It also captures the workforce growth showing the positive shift from temporary
headcount to permanent.  
Table 1.2 Head count Variance
Table 1.3 below provides more information on the variance across all services with the comparison data illustrating the
steady reduction of the workforce. Notably Roads and Neighbourhood and Supply and Distribution have seen a significant
shift in their demographic. They have both retained their significant apprenticeship allocation, with the majority of other areas
reducing their allocation. Similarly the fixed term headcount has reduced with a corresponding increase in permanent
headcount in Supply Distribution and Property, reflecting the work being carried out in this area to stabilise the workforce and
provide permanent roles where possible. In Roads and Neighbourhood the temporary headcount has reduced significantly in
the main due to the reduced seasonal greenspace contracts. Some Services such as Resources and Mental Health,
Addiction and Learning Disabilities have been affected by resignations and retirements at this snap shot in time. 
Education Learning and Attainment, previously saw the anticipated increases associated with the Early Years expansion and
additional grant funding from Scottish Government for COVID recovery. Covid funding is also reflected in the increase in
temporary headcount for teachers.
Total
No. % of Total Yearly VariancNo. % of Total Yearly Variance No. % of Total Yearly Variance No. Yearly Variance
31/03/2018 71 1.20% -25% 490 8.6 15% 5127 90% 1% 5688 -1%
31/03/2019 74 1.30% 4% 579 10.1% 18% 5081 88% -1% 5734 1%
31/03/2020 89 1.50% 20% 581 9.9% 0% 5201 88.60% 2% 5871 2%
31/03/2021 73 1.20% -18% 552 9.3% -5% 5318 89.50% 2% 5943 1%
31/03/2022 54 1% -7% 527 9% -1% 5335 90.18% 1% 5916 -1%
Overall Headcount Variance
(31/03/2018 - 31/03/2022)
Apprentice Fixed Term Permanent
Page 236

Page 237

Table 1.3 Variance across services
2022 compared to 2021
Citizen Culture & Facilities 1 -2 60 21 634 1 695 20
Education 8 0 104 -21 958 18 1070 -3
Housing & Employability 0 -4 68 25 275 2 343 23
People & Technology 0 -4 6 -14 100 5 106 -13
Regulatory & Regeneration 0 0 11 1 106 3 117 4
Resources 0 0 15 -1 224 -8 239 -9
Roads & Neighbourhood 15 -7 23 2 349 -1 387 -6
Supply, Distribution & Property 29 1 9 -48 381 27 419 -20
Vaccination Centre Team 0 0 10 10 2 2 12 12
Chief Exec Office 53 -16 306 -25 3029 49 3388 8
Child Health Care & Criminal Justice 0 0 20 1 247 -4 267 -3
Community Health & Care 0 -1 13 -12 955 -4 968 -17
Finance & Resources 0 0 1 0 4 -1 5 -1
Mental Health Addiction & Learning 1 -2 14 -2 142 -11 157 -15
Strategy, Planning & Health Improve 0 0 1 -1 24 4 25 3
Health & Social Care Partnership 1 -3 49 -14 1372 -16 1422 -33
Strategic Management 0 0 0 0 13 0 13 0
Local Government Employees Tota 54 -19 355 -39 4414 33 4823 -25
Education (Teachers) 0 0 172 14 921 -16 1093 -2
Council Wide Total 54 -19 527 -25 5335 17 5916 -27
TotalPermanentApprentice Fixed-Term
Page 237

Page 238

Table 1.4 Casual variance
Table 1.4 shows the casual variance compared to last year and shows a significant decrease in casuals registered for work
with WDC. Invigilators were previously reported in this category but have been separated as they are not covered by any
bargaining group (Local Government or Teachers) and their pay is reclaimed by WDC and fully paid by SQA. 
2022 compared to 2021 Casual Invigilators
Citizen Culture & Facilities 9 -3 0 0
Education 39 -7 42 -15
Housing & Employability 2 -6 0 0
People & Technology 0 0 0 0
Regulatory & Regeneration 4 -1 0 0
Resources 0 0 0 0
Roads & Neighbourhood 37 3 0 0
Supply, Distribution & Property 0 0 0 0
Vaccination Centre Team 7 0 0 0
Chief Exec Office 98 -14 42 -15
Child Health Care & Criminal Justice 17 -6 0 0
Community Health & Care 40 -6 0 0
Finance & Resources 0 0 0 0
Mental Health Addiction & Learning Disabilities 0 0 0 0
Strategy, Planning & Health Improvement 0 0 0 0
Health & Social Care Partnership 57 -12 0 0
Strategic Management 0 0 0 0
Local Government Employees Total 155 -26 42 -15
Education (Teachers) 224 -64 0 0
Council Wide Total 379 -90 42 -15
Page 238

Page 239

Table 1.5 Overall FTE Variance
The significant reduction in this area is accounted for by seasonal employees who are retained as casual in between
seasonal contracts to allow for participation in casual work as required. Seasonable contracts commence early April and
they still featured in the end of year statistics. Teachers were another area where there was a decrease in Supply staff. 
2. Full time Equivalent
Table 2.1
This year the growth is balanced at -1% across both FTE and Headcount demonstrating a very slight decrease in both
headcount and working hours. 
Total
No. % of Total Yearly VariancNo. % of Total Yearly Variance No. % of Total Yearly Variance No. Yearly Variance
31/03/2018 71 1.20% -25% 490 8.6 15% 5127 90% 1% 5688 -1%
31/03/2019 74 1.30% 4% 579 10.1% 18% 5081 88% -1% 5734 1%
31/03/2020 89 1.50% 20% 581 9.9% 0% 5201 88.60% 2% 5871 2%
31/03/2021 73 1.20% -18% 552 9.3% -5% 5318 89.50% 2% 5943 1%
31/03/2022 54 1% -7% 527 9% -1% 5335 90.18% 1% 5916 -1%
Overall Headcount Variance
(31/03/2018 - 31/03/2022)
Apprentice Fixed Term Permanent
Full time equivalent
Apprentice Fixed-Term Permanent Total
Citizen Culture & Facilities 1.00 33.78 416.09 450.88
Education 8.00 81.57 785.84 875.41
Housing & Employability 0.00 56.40 263.49 319.88
People & Technology 0.00 5.00 93.70 98.70
Regulatory & Regeneration 0.00 9.50 99.14 108.64
Resources 0.00 13.31 193.70 207.01
Roads & Neighbourhood 15.00 21.27 303.35 339.62
Supply, Distribution & Property 29.00 8.83 368.05 405.88
Vaccination Centre Team 0.00 5.53 2.00 7.53
Chief Exec Office 53.00 235.18 2525.37 2813.56
Child Health Care & Criminal Justice 0.00 17.35 221.25 238.60
Community Health & Care 0.00 10.72 708.69 719.41
Finance & Resources 0.00 1.00 3.50 4.50
Mental Health Addiction & Learning Disabilities 1.00 9.89 114.67 125.56
Strategy, Planning & Health Improvement 0.00 0.73 21.81 22.54
Health & Social Care Partnership 1.00 39.69 1069.92 1110.61
Strategic Management 0.00 0.00 13.00 13.00
Local Government Employees Total 54.00 274.88 3608.29 3937.17
Education (Teachers) 0.00 164.30 845.10 1009.40
Council Wide Total 54.00 439.18 4453.39 4946.57
Page 239

Page 240

3. Fixed Term Contracts
There are 527 employees working on a fixed term basis and 132 of these hold fixed term contracts which have a duration
exceeding 2 years (relevant for various employment rights). The table below illustrates the location of these employees and
compares to last year. There has been a decrease in Fixed Term contracts within Building Services due to all fixed term
employees being issued with permanent contracts.
Table 3.1
Number of employees on fixed-term contract for longer than 2 years 2021 2022
Citizen Culture & Facilities 3 4
Education 37 28
Housing & Employability 18 23
People & Technology 0 0
Regulatory & Regeneration 7 4
Resources 3 4
Roads & Neighbourhood 20 18
Supply, Distribution & Property 49 21
Vaccination Centre Team 0 0
Chief Exec Office 137 102
Child Health Care & Criminal Justice 6 9
Community Health & Care 5 3
Finance & Resources 1 1
Mental Health Addiction & Learning Disabilities 5 5
Strategy, Planning & Health Improvement 1 0
Health & Social Care Partnership 18 18
Strategic Management 0 0
Local Government Employees Total 155 120
Education (Teachers) 11 12
Council Wide Total 166 132
Page 240

Page 241

4. Full time / Part time Split
Table 4.1
The number of full time contracts has reduced this year by 16 and the number of part time contracts has decreased by 11
reflective of the drop in headcount. The percentage of part time contracts has decreased by 1% this year with 47% of the
workforce term time, sessional or reduced working hours and 53% working a full time contract. 
Full-Time Part-Time
Citizen Culture & Facilities 145 550
Education 430 640
Housing & Employability 281 62
People & Technology 90 16
Regulatory & Regeneration 93 24
Resources 142 97
Roads & Neighbourhood 292 95
Supply, Distribution & Property 375 44
Vaccination Centre Team 2 10
Chief Exec Office 1850 1538
Child Health Care & Criminal Justice 200 67
Community Health & Care 196 772
Finance & Resources 4 1
Mental Health Addiction & Learning Disabilities 71 86
Strategy, Planning & Health Improvement 17 8
Health & Social Care Partnership 488 934
Strategic Management 13 0
Local Government Employees Total 2351 2472
Education (Teachers) 809 284
Council Wide Total 3160 2756
Page 241

Page 242

5. Grade Profile
Table 5.1
As shown above the most prominent grade amongst Local Government Employees remains Grade 3, followed by Grade 5. For teachers
the most prominent grade is a Main Grade Teacher.
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Number of staff under each grade
Page 242

Page 243

6. Sex Profile
Table 6.1
The sex profile remains fairly consistent with 73.4% of the workforce female and 26.6% male. There are no significant
changes across the workforce with female predominance in Education and HSCP and male predominance in Roads and
Neighbourhood and Supply Distribution and Property.
Headcount Percentage Headcount Percentage
Citizen Culture & Facilities 589 84.7% 106 15.3%
Education 1004 93.8% 66 6.2%
Housing & Employability 193 56.3% 150 43.7%
People & Technology 55 51.9% 51 48.1%
Regulatory & Regeneration 75 64.1% 42 35.9%
Resources 203 84.9% 36 15.1%
Roads & Neighbourhood 33 8.5% 354 91.5%
Supply, Distribution & Property 64 15.3% 355 84.7%
Vaccination Centre Team 3 25.0% 9 75.0%
Chief Exec Office 2219 65.5% 1169 34.5%
Child Health Care & Criminal Justice 209 78.3% 58 21.7%
Community Health & Care 886 91.5% 82 8.5%
Finance & Resources 5 100.0% 0 0.0%
Mental Health Addiction & Learning Disabilities 103 65.6% 54 34.4%
Strategy, Planning & Health Improvement 24 96.0% 1 4.0%
Health & Social Care Partnership 1227 86.3% 195 13.7%
Strategic Management 9 69.2% 4 30.8%
Local Government Employees Total 3455 71.6% 1368 28.4%
Education (Teachers) 887 81.2% 206 18.8%
Council Wide Total 4342 73.4% 1574 26.6%
Female Male
Page 243

Page 244

7. Age Profile
Table 7.1
The distribution curve for the age demographic across the council remains fairly consistent with previous years. The highest
proportion of people are in the 50-54 and 55-59 age group. There has been a slight reduction in the 16-19 age group
consistent with the reduction in modern apprenticeships. Although the percentage of employees working past 65 across the
Demographics – Age (Percentage)
16-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65+
Citizen, Culture & Facilities 0.7% 3.0% 4.9% 9.1% 10.2% 9.6% 7.9% 13.4% 17.8% 16.4% 6.9%
Education 1.6% 4.4% 4.1% 3.1% 7.0% 11.4% 8.3% 15.2% 17.1% 19.6% 8.3%
Housing & Employability 16.7% 41.7% 16.7% 0.0% 0.0% 0.0% 0.0% 8.3% 8.3% 0.0% 8.3%
People & Technology 0.9% 4.5% 6.4% 8.3% 9.9% 11.5% 10.2% 15.1% 16.5% 12.2% 4.5%
Regulatory & Regeneration 0.0% 3.0% 4.9% 10.5% 9.7% 14.6% 12.7% 13.1% 16.5% 11.2% 3.7%
Resources 0.3% 2.3% 5.9% 7.2% 6.2% 8.3% 10.0% 16.0% 19.6% 17.1% 7.0%
Roads & Neighbourhood 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.0% 40.0% 40.0% 0.0% 0.0%
Supply, Distribution & Property 0.0% 1.9% 5.1% 7.0% 10.8% 15.3% 10.2% 17.2% 15.3% 10.8% 6.4%
Vaccination Centre 16.7% 41.7% 16.7% 0.0% 0.0% 0.0% 0.0% 8.3% 8.3% 0.0% 8.3%
Chief Exec Office 0.9% 4.5% 6.4% 8.3% 9.9% 11.5% 10.2% 15.1% 16.5% 12.2% 4.5%
Child Health Care & Criminal Justice 0.0% 3.0% 4.9% 10.5% 9.7% 14.6% 12.7% 13.1% 16.5% 11.2% 3.7%
Community Health & Care 0.3% 2.3% 5.9% 7.2% 6.2% 8.3% 10.0% 16.0% 19.6% 17.1% 7.0%
Finance & Resources 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.0% 40.0% 40.0% 0.0% 0.0%
Mental Health, Addictions & Learning Disabilities 0.0% 1.9% 5.1% 7.0% 10.8% 15.3% 10.2% 17.2% 15.3% 10.8% 6.4%
Strategy, Planning & Health Imporovement 0.0% 0.0% 0.0% 4.0% 16.0% 28.0% 20.0% 16.0% 8.0% 8.0% 0.0%
Health & Social Care Partnership 0.2% 2.3% 5.5% 7.7% 7.5% 10.5% 10.8% 15.7% 18.4% 15.1% 6.2%
Strategic Management 0.0% 0.0% 0.0% 0.0% 0.0% 7.7% 23.1% 23.1% 30.8% 15.4% 0.0%
Local Government Employee's Total 9.6% 3.9% 6.1% 8.1% 9.2% 11.2% 10.4% 15.3% 17.1% 13.0% 5.0%
Education (Teachers) 0.0% 3.0% 13.9% 16.8% 16.7% 15.0% 9.9% 10.7% 8.1% 4.8% 1.1%
Council Wide Total 0.5% 3.7% 7.6% 9.7% 10.5% 11.9% 10.3% 14.5% 15.4% 11.5% 4.3%
Page 244

Page 245

council has stabilised local government employees have seen a decrease of 0.4% and teachers have shown an increase of
0.1% compared to last year. Housing and Employability has seen the most notable change in the last year with an increase
of over 4% in the over 65 category to 8.3%. 
8. Length of Service
Table 8.1
The distribution of Length of service remains fairly consistent with the highest percentage serving 10 years or more.
* Above data pertains to WDC service only (excluding continuous service with any public authority to which the redundancy
Payments Modification Order (Local Government) 1983 (as amended applies).
Length of service
Headcount Percentage Headcount Percentage Headcount Percentage
Citizen Culture & Facilities 109 15.7% 236 34.0% 350 50.4%
Education 92 8.6% 464 43.4% 514 48.0%
Housing & Employability 34 9.9% 131 38.2% 178 51.9%
People & Technology 14 13.2% 36 34.0% 56 52.8%
Regulatory & Regeneration 14 12.0% 39 33.3% 64 54.7%
Resources 15 6.3% 66 27.6% 158 66.1%
Roads & Neighbourhood 18 4.7% 119 30.7% 250 64.6%
Supply, Distribution & Property 14 3.3% 183 43.7% 222 53.0%
Vaccination Centre Team 8 66.7% 2 16.7% 2 16.7%
Chief Exec Office 318 9.4% 1276 37.7% 1794 53.0%
Child Health Care & Criminal Justice 22 8.2% 87 32.6% 158 59.2%
Community Health & Care 106 11.0% 378 39.0% 484 50.0%
Finance & Resources 0 0.0% 1 20.0% 4 80.0%
Mental Health Addiction & Learning Disabilities 11 7.0% 56 35.7% 90 57.3%
Strategy, Planning & Health Improvement 2 8.0% 3 12.0% 20 80.0%
Health & Social Care Partnership 141 9.9% 525 36.9% 756 53.2%
Strategic Management 2 15.4% 7 53.8% 4 30.8%
Local Government Employees Total 461 9.6% 1808 37.5% 2554 53.0%
Education (Teachers) 74 6.8% 493 45.1% 526 48.1%
Council Wide Total 535 9.0% 2301 38.9% 3080 52.1%
10 or more yearsLess than 1 year 1 to 9 years
Page 245

Page 246

9. New Start
Table 9.1
535 new employees joined the council in 2021/22 which is an increase of 53 from last year and is also higher than the
previous 2 years (2017/18, 2018/19) which saw 487 and 486 respectively. The table below shows this information by service
and contract type.
10. Turnover
Table 10.1
The information below presents crude turnover (i.e. based on all leavers) and shows an increase in turnover to 13.4%
compared to last year, 8.3%. Between 2016-18, the turnover figure was between 8.6 and 8.7%, this reduced to 8% in 18/19
and further reduced to 7.9% in 19/20. It would appear that turnover was exceptionally high in 21/22 compared to previous
years and this may be an impact of the Covid Pandemic. The leaver’s information in section 11 outlines that the vast majority
of leavers were resignations, however the introduction of vaccination centres would have contributed to this.
New Start Employees
Apprentice Fixed-Term Permanent Total
Citizen Culture & Facilities 1 47 61 109
Education 3 41 48 92
Housing & Employability 0 20 14 34
People & Technology 0 6 8 14
Regulatory & Regeneration 0 4 10 14
Resources 0 9 6 15
Roads & Neighbourhood 6 5 7 18
Supply, Distribution & Property 6 0 8 14
Vaccination Centre Team 0 8 0 8
Chief Exec Office 16 140 162 318
Child Health Care & Criminal Justice 0 5 17 22
Community Health & Care 0 4 102 106
Finance & Resources 0 0 0 0
Mental Health Addiction & Learning Disabilities 0 5 6 11
Strategy, Planning & Health Improvement 0 1 1 2
Health & Social Care Partnership 0 15 126 141
Strategic Management 0 0 2 2
Local Government Employees Total 16.0 155.0 290.0 461
Education (Teachers) 0 65 9 74
Council Wide Total 16 220 299 535
Page 246

Page 247

Turnover
Staff at 1 April 2021 Staff at 1 April 2022 Average Leavers in Last 12 Months Turnover %
Citizen Culture & Facilities 675 695 685 139 20.3%
Education 1073 1070 1072 144 13.4%
Housing & Employability 320 343 332 31 9.4%
People & Technology 119 106 113 14 12.4%
Regulatory & Regeneration 113 117 115 23 20.0%
Resources 248 239 244 14 5.7%
Roads & Neighbourhood 393 387 390 34 8.7%
Supply, Distribution & Property 439 419 429 34 7.9%
Vaccination Centre Team 0 12 6 48 800.0%
Chief Exec Office 3380 3388 3384 481 14.2%
Child Health Care & Criminal Justice 270 267 269 29 10.8%
Community Health & Care 985 968 977 164 16.8%
Finance & Resources 6 5 6 0 0.0%
Mental Health Addiction & Learning Disabilities 172 157 165 21 12.8%
Strategy, Planning & Health Improvement 22 25 24 4 17.0%
Health & Social Care Partnership 1455 1422 1439 218 15.2%
Strategic Management 13 13 13 3 23.1%
Local Government Employees Total 4848 4823 4836 702 14.5%
Education (Teachers) 1095 1093 1094 93 8.5%
Council Wide Total 5943 5916 5930 795 13.4%
Page 247

Page 248

11. Leavers
Table 11.1
The numbers of leavers has increased to 795 employees leaving the organisation compared to 490 last year, 457 in 2020
and 475 in 2019.
* Figures of under 5 have been removed and replaced with a * due to the possible identification of individuals.
Service
Death in
Service
Dismissal -
End of
Cont
Dismissal -
Ill Heath
Dismissal -
With
Notice
Employee
Not Started Resignation
Retiral
- Age
Retiral -
Ill Health
Retiral
on
Option
(60+)
Teacher -
End Fixed
Term
Teacher
- Other
Teacher -
Retirement
Age
Teacher -
Retirement
Other
Teacher -
Vol
Resign
Other
Unused
Casual
Grand
Total
Citizen, Culture & Facilities * * 7 0 * 111 11 * 0 0 0 0 0 0 0 139
Education * 7 0 0 * 95 25 * 5 0 0 0 0 0 7 144
Housing & Employability 0 5 0 0 0 19 * * 0 0 0 0 0 0 * 31
People & Technology 0 * 0 0 0 9 * 0 0 0 0 0 0 0 0 14
Regulatory & Regeneration * 0 0 0 * 17 * * 0 0 0 0 0 0 0 23
Resources 0 0 0 0 * 9 * 0 0 0 0 0 0 0 0 14
Roads & Neighbourhood 4 12 * 0 0 11 * * * 0 0 0 0 0 0 34
Supply,Distribution & Property 0 * 0 * 0 23 5 * * 0 0 0 0 0 0 34
Vaccination Centre Team 0 22 0 * * 23 0 0 0 0 0 0 0 0 0 48
Chief Exec Office Total 4 46 9 3 7 317 55 12 8 0 0 0 0 0 10 481
Child Health Care & C J * 0 * 0 0 20 7 0 0 0 0 0 0 0 0 29
Community Health & Care * * 17 6 * 93 19 11 * 0 0 0 0 0 12 164
Finance & Resources 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Mental Health Addic & LD 0 * 0 0 0 14 * * * 0 0 0 0 0 0 21
Strategy, Planning & HI 0 0 0 0 0 * * 0 0 0 0 0 0 0 0 4
HSCP Total 2 4 18 6 2 129 31 12 2 0 0 0 0 0 12 218
Strategic Management 0 0 0 0 0 2 0 0 * 0 0 0 0 0 0 3
Local Government Total 9 57 27 9 9 448 86 24 11 0 0 0 0 0 22 702
Education (Teachers) 0 * 0 0 0 39 12 0 * 27 4 1 2 3 0 93
Council Wide Total 9 60 27 9 9 487 98 24 13 27 4 1 2 3 22 795
Page 248

Page 249

12. Apprentices
Table 12.1
The number of apprenticeships supported by the council across both level 2 and level 3 has continued to decrease from 73
last year. This is due to the impact of COVID with a reduction in apprentices recruited by departments as a result of the
Pandemic in office based apprentices e.g. Business Administration, ICT, Customer Service, HR and budget implications. 
13. Sickness Absence
From 1st April 2021 to 31st March 2022, there was an increase in Council wide sickness absence of 40,901.6 FTE days lost
(approximately 62%) compared to 2020/21. It should be noted that this is in the context of the return to the workplace for the
majority of employees who had previously been unable to operate fully and were working from home, where possible, or
were only able to carry out essential work. The impact of the Pandemic has most likely had an impact on people personally
and professionally.
Apprentices
Level 2 Level 3 Total
Citizen Culture & Facilities 0 1 1
Education 0 8 8
Housing & Employability 0 0 0
People & Technology 0 0 0
Regulatory & Regeneration 0 0 0
Resources 0 0 0
Roads & Neighbourhood 6 9 15
Supply, Distribution & Property 0 29 29
Vaccination Centre Team 0 0 0
Chief Exec Office 6 47 53
Child Health Care & Criminal Justice 0 0 0
Community Health & Care 0 0 0
Finance & Resources 0 0 0
Mental Health Addiction & Learning Disabilities 0 1 1
Strategy, Planning & Health Improvement 0 0 0
Health & Social Care Partnership 0 1 1
Strategic Management 0 0 0
Local Government Employees Total 6 48 54
Education (Teachers) 0 0 0
Council Wide Total 6 48 54
Page 249

Page 250

The table below illustrates the reasons for absence distribution across the year and Minor Illness is the highest category of
absence followed by personal stress and acute medical conditions. Full details and analysis of sickness absence is covered
in the wellbeing report submitted to committee.
Table 13.1
Minor Illness Back Pain
Musculo-
skeletal
Injuries
Stress -
Personal
Recurring
Medical
Conditions
Non Work
Related
Accident /
Injuries
Work Related
Accidents /
Injuries
Mental Health Acute Medical
Conditions
Pregnancy
Related
Absence
Drink or Drug
Related
Condition
Stress - Work
Related
Notifiable
Disease
(Confirmed)
Long Covid
Citizen Culture & Facilities 441.25 4003.3 371.1 1087.8 2275.3 187.7 280.7 230.6 489.8 1918.9 58.9 0.0 589.2 2210.0 65.7 13768.8 6,095.87 13.81
Education (Support Staff) 364.92 4089.7 344.4 1221.1 2373.6 1499.0 184.9 182.1 1536.4 2361.3 452.4 0.0 664.5 5100.6 707.2 20717.2 5,093.26 13.96
Housing & Employability 410.70 722.6 170.6 400.6 503.1 114.1 75.2 115.9 359.7 772.1 22.9 0.0 495.4 487.5 36.6 4276.2 6,729.80 16.39
People & Technology 2,830.07 44.4 0.0 30.0 116.4 62.1 226.4 0.0 16.4 175.7 0.0 0.0 0.0 45.9 32.0 749.3 37,575.95 13.28
Regulatory & Regeneration 237.82 58.6 0.0 1.0 75.3 0.0 5.0 0.0 30.7 420.1 0.0 0.0 562.0 132.6 27.4 1312.7 3,565.84 14.99
Resources 733.56 245.8 14.4 93.7 537.4 147.7 86.3 31.4 43.1 3.0 90.7 0.0 61.6 128.4 5.0 1488.5 19,621.48 26.75
Roads & Neighbourhood 5.11 806.2 364.1 963.3 346.6 301.3 415.7 102.5 311.4 1620.6 0.0 0.0 237.1 752.6 249.3 6470.7 9.21 1.80
Supply Distribution & Property 410.70 1082.4 906.4 2059.2 1080.9 269.9 66.8 60.9 453.9 1351.3 27.9 0.0 324.5 1045.7 17.9 8747.5 6,729.80 16.39
Vaccination Centres 24.22 65.7 0.0 0.0 0.0 0.0 20.7 0.0 24.9 0.0 0.0 2.0 0.0 0.0 0.0 113.3 29.35 1.21
Chief Exec Office Total 2,830.07 11118.6 2171.0 5856.6 7308.6 2581.9 1361.7 723.4 3266.3 8622.9 652.7 2.0 2934.3 9903.2 1141.0 57644.3 37,575.95 13.28
Child Healthcare & Criminal Justice 237.82 539.9 121.1 85.0 676.3 36.4 299.4 0.0 480.6 1127.5 62.4 0.0 231.1 529.5 239.3 4428.6 3,565.84 14.99
Community Health & Care 733.56 4601.2 1922.2 4833.3 6678.0 590.1 713.4 533.1 931.4 5548.1 411.6 53.6 934.0 2692.3 1427.9 31869.9 19,621.48 26.75
Finance & Resources 5.11 0.0 0.0 18.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.4 9.21 1.80
Mental Health, Addiction & Learning Disabilities 129.74 416.8 57.6 631.0 265.6 245.6 207.6 40.0 628.3 570.7 113.6 0.0 446.9 316.3 32.1 3972.1 2,771.51 21.36
Strategy, Planning & Health Improvement 21.58 19.8 0.0 0.0 57.1 5.0 0.0 0.0 0.0 27.9 10.0 0.0 13.6 19.9 0.0 153.2 111.05 5.15
Health & Social Care Partnership 1,127.80 5577.6 2100.9 5567.7 7677.1 877.2 1220.4 573.1 2040.3 7274.1 597.6 53.6 1625.6 3558.0 1699.3 40442.3 26,079.09 23.12
Strategic Management 12.73 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00
Strategic Management 12.73 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00
LOCAL GOVERNMENT EMPLOYEES 3,970.60 16696.2 4271.9 11424.3 14985.7 3459.1 2582.1 1296.5 5306.6 15897.1 1250.3 55.6 4559.8 13461.2 2840.3 98086.6 63,655.04 16.03
Education (Teachers) 919.08 2078.4 107.9 450.4 1462.0 292.4 48.6 328.1 231.4 966.6 251.6 0.0 502.3 3752.9 322.0 10794.5 7,497.79 8.16
COUNCIL-WIDE TOTAL 4,889.68 18774.6 4379.8 11874.7 16447.7 3751.5 2630.7 1624.6 5538.0 16863.7 1501.9 55.6 5062.1 17214.0 3162.3 108881.1 71,152.83 14.55
Department
FTE
Employee
s
Absence Reasons
Total Working
Days Lost
FTE Days
Lost
Total FTE
Days Lost
by FTE
Employees
Page 250

Page 251

Table 13.2
Absence Reason Working
Minor Illness 18,774.6
Back Pain 4,379.8
Musculo-skeletal Injuries 11,874.7
Stress 16,447.7
Recurring Medical Conditions 3,751.5
Non Work Related Accidents / Injuries 2,630.7
Work Related Accidents / Injuries 1,624.6
Mental Health 5,538.0
Acute Medical Conditions 16,863.7
Pregnancy Related Absence 1,501.9
Drink or Drug Related Condition 55.6
Stress - Work Related 5,062.1
Notifiable Disease (Confirmed) 17,214.0
Long Covid 3,162.3
TOTAL 108,881.1
1.38%
0.05%
4.65%
2.90%
100%
15.49%
Percentage of Lost Days
17.24%
4.02%
10.91%
15.11%
3.45%
2.42%
1.49%
5.09%
15.81%
Page 251

Page 252

Employees with no absence
The table below displays the number of employees who have had no absence during the year, which accounts for 31.7% of
the overall workforce. A 20.7% regression from last year’s figure of 52.4%.
Table 13.3
Absence No absence Total
Citizen Culture & Facilities 70.6% 29.4% 100%
Education 79.2% 20.8% 100%
Housing & Employability 51.6% 48.4% 100%
People & Technology 24.5% 75.5% 100%
Regulatory & Regeneration 40.2% 59.8% 100%
Resources 42.7% 57.3% 100%
Roads & Neighbourhood 55.6% 44.4% 100%
Supply, Distribution & Property 69.5% 30.5% 100%
Vaccination Centre Team 58.3% 41.7% 100%
Chief Exec Office 65.0% 35.0% 100%
Child Health Care & Criminal Justice 58.8% 41.2% 100%
Community Health & Care 76.2% 23.8% 100%
Finance & Resources 40.0% 60.0% 100%
Mental Health Addiction & Learning Disabilities 65.6% 34.4% 100%
Strategy, Planning & Health Improvement 52.0% 48.0% 100%
Health & Social Care Partnership 71.2% 28.8% 100%
Strategic Management 0.0% 100.0% 100%
Local Government Employees Total 66.7% 33.3% 100%
Education (Teachers) 75.3% 24.7% 100%
Council Wide Total 68.3% 31.7% 100%
Page 252

Page 253

Appendix 3 - Workforce Plan 2022/23
This Appendix is split into 3 sections:
1. Workforce Planning Priorities and on-going actions
2. Workforce Planning - People First Strategy – 5 Year Plan
3. Workforce Planning Framework Actions 2022/23
1. Workforce Planning Priorities and On-going Actions
The table below outlines the 4 revised Workforce Planning (WFP) priorities which will feature in Service Delivery Plans. Whilst
People & Change are currently working on a new 5 Year plan, People First, a number of actions linked to workforce planning
continue to be relevant and on-going. Services will take cognisance of these High Level Workforce Planning actions and reflect in
their Service Delivery Workforce Plans. 
1. Our People (Workforce Profile) - Ensure resilience and engagement of the workforce:
Strategy
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities, improved resilience
and promotion of a diverse workforce.
Expected Outcomes
Gap is addressed, whilst:
• Improved resilience across teams leading to improving employee engagement and lower absence levels
• Ensuring employees feel valued and results in improved practices, increased efficiency and productivity
• Retention of knowledge and skills associated with critical roles, lowered turnover
• Create a more agile and better informed workforce
• Council workforce-related equality outcomes and actions are met and demonstrated by achievement of associated equality
improvement targets.
• Progressing on equality indicators and Equal Pay Analysis (pay and allowances)
• Make better use of data for informed decision making
• Use of expertise to drive improvement
Appendix 3
Page 253

Page 254

Action Requirement Resources
needed
Measure of Outcome Due Date Assigned To
Support Implementation of Equalities Action Plan
Priorities for 2022/23 relate to Data Verification,
actions to increase diversification of workforce,
Equally Safe at Work (Development Stage) and
Support of Armed Forces.
Workforce Actions and outcomes embedded at
Service level and used to inform
workforce planning considerations and
future actions.
31-Mar-2023 All Managers
Continued use of the Workforce Management
Console to support better use of data to inform
decision making and improve workforce planning
practice. 
Workforce Manager use of console data and
feedback to develop further relating to
need. Managers are able to embrace new
developments.
31-Mar-2023 All Managers
Continue to improve and develop employee
engagement.
Workforce Improved employee engagement and
organisational alignment. Positive
employee surveys, increased Champions
for Trickle, wellbeing and Digital.
Increased use of Trickle and employee
forums for support. Improved culture and
people management practices
31-Mar-2023 All Managers
Continued support of implementation of Employee
Wellbeing Strategy.
Workforce   Improved employee engagement and
lower sickness absence rates. Sufficient
representation on Employee Wellbeing
Advocate and Managers Group.
31-Mar-2023 All Managers
Ensure  Be-the-best conversation are undertaken
with all employees, supporting improved employee
engagement and recognition, identifying training
needs, personal and professional development
goals
Managers
/
Section
Heads 
Be-the-best conversations conducted
regularly with  information linking to
improved employee engagement,
recognition, personal and professional
development
31-Mar-2023 All Managers
Page 254

Page 255

Continue to monitor and consider more flexible
ways of working, considering people management
policies and practices to better support the
workforce.
Workforce Improved flexibility which responds to
needs of service and workforce, support
improved work life balance and removal
of barriers.
31-Mar-2023 All Managers
2. Recruitment & Retention – Current and predicted future workforce gaps are addressed and core skill sets retained
Strategy 
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain the workforce
Expected Outcome
• Retention of knowledge and skills associated with critical roles (and avoiding associated turnover)
• Council workforce-related equality outcomes are met and demonstrated by achievement of associated equality improvement targets.
• Progressing on equality indicators
• Attracting key skills into the workforce as an employer of choice
• Ensuring staff are encouraged to re-train and re-align to newer digital skills to allow the Council to reduce attrition while making jobs
interesting
• Minimising requirement to recruit for new capabilities
• Skills gaps are addressed and talent pool pipelines established
Action Title Resources
needed
Measure of Outcome Due Date Assigned To
Review of current and future staffing requirements
linked to service delivery plan requirements,
establishing any gaps to inform workforce planning
and actions and outcomes.
workforce Improved workforce planning activity
(1/4ly reviews established) including
scenario planning and early identification
of actions to mitigate risks. Actions are
targeted to need including training,
recruitment, FFF reviews, employee
wellbeing/engagement and development
of internal and external talent pools. 
31-Mar-2023 All Managers
Page 255

Page 256

Succession planning in workforce reviewed
including shadowing/transfer and development
opportunities considered. 
Workforce   Uptake of re/training and development
opportunities including interest in
council’s Digital projects.
31-Mar-2023 All Managers
Continued consideration and implementation of
one team approach within and across services
ensuring cross skilling and resilience planning.
Workforce Progression of individual/collective
development interventions 
31-Mar-2023 All Managers
Review of roles and profiles in line with service
improvements to reflect changes in service, council
ethos and one team approach to improve
recruitment & retention.
Workforce Profiles that reflect service need, culture
and positive impact on recruitment
31-Mar-2023 All Managers
Continued support of the internal recruitment
market and employee development opportunities
supporting increased service resilience, talent
development, succession planning and career
development.
Managers Increased employee development
opportunities to aid succession planning.
31-Mar-2023 All Managers
3. Structure & Roles – Service Structure and delivery model/s are stable, fit for purpose and future requirements;
Strategy 
Implement service review process including role design, use of new technology and new ways of working  to add resilience,
address gaps, and establish opportunities for efficiencies 
Expected Outcome
• Ensuring service priorities are met whilst meeting budget considerations
• Minimising risk of voluntary or compulsory redundancy
• Enabling flexibility to address fluctuations in service demand
• A systems-based approach is adopted council wide utilising a service design approach to organisational change to improve service
delivery and ensure it meets the needs of citizens.
Page 256

Page 257

• Improved efficiency and effectiveness of service provision
• Continue with council wide digital transformation
Action Title Resource
needed
Measure of Outcome Due Date Assigned To
Priority/
Action links
Continue to support a culture of continuous
improvement identifying opportunities to develop
the workforce and processes building resilience.
Workforce/
Systems 
Monitor delivery plans and performance
to inform action. Continue to utilise and
embed Service design/Lean/Six Sigma
skills.  Efficiencies in processes identified
and benefits realised. 
31-Mar-2023 All Managers
Support Fit for Future Reviews - promote better
use of data, improved decision making and better
people practices. Fully utilising existing systems
and technologies 
Workforce   Improved employee engagement and
delivery of improved people practices via
Fit for Future Reviews.
31-Mar-2023 All Managers
Support the implementation of service review
processes including role re-design, use of new
technology and new ways of working to add
resilience, address gaps, and establish
opportunities for efficiencies
Workforce Improved service provision 31 Mar 2023 All managers
Support Digital Transformation implementation and
plan and better use of Management information
systems.
Workforce
/funding
Evidence of capability and subsequent
organisational impact
31-Mar-2023 All Managers
Continue to develop and support the systems
development in a more remote work environment.
Workforce Successful transition to more remote
practices and home and remote working,
online solutions
31-Mar-2023 All Managers
supported by IT
4. Skills & Capabilities – Current and future skills gaps and capabilities are addressed
Page 257

Page 258

Strategy 
Develop and implement training plans and development opportunities to improve capabilities and resilience within the workforce.
Expected Outcome
• Ensuring service priorities are met as a result of application of those new capabilities
• Ensuring staff are encouraged to develop new skills
• Ensuring value for money in terms of training solutions
• Minimising requirement to recruit for new capabilities
• More accessible online training and employee support provision
• Skills Gaps are minimised
• Succession planning and knowledge transfer solutions
Action Title Resources
needed
Measure of Outcome Due Date Assigned To
Further develop leadership skills within relevant
services in line with the people management
framework.
Workforce Well-developed leadership skills linked to
succession planning and Service Delivery
Needs. Collaborative and improved
working practices. Reduction in ER
issues.
31-Mar-2023 All Managers
Continue to develop digital and data analysis skills
in areas /service where this continues to be
required 
Workforce Improved skills in digital and data
analysis specific to systems.
31-Mar-2023 All Managers
Robust scoping and implementation of training
requirements linked to workforce planning actions
to improve capabilities and resilience within the
workforce.
Workforce/
budget
Training requirements are scoped and
effective solutions found including
knowledge transfer opportunities.
31-Mar-2023 All Managers
Page 258

Page 259

2. Workforce Planning - People First Strategy – 5 Year Plan
In line with the People First Strategy Workforce Planning Activity will be focused around the following High Level Actions in the
table below. As work progresses in relation to this plan, specific actions will be developed and fed into the Workforce Planning
Activity and are subject to change as the work progresses and in response to need.
Year 1 Year 2 Year 3 Year 4 Year 5
Attraction and
Recruitment
On boarding Development Retention Off boarding
Skills and recruitment
gaps are forecast and
identified timely and
Workforce plans reflect
how gaps can be filled
(Buy, Build, Borrow or
Bridge) effectively.
Support Services to
review job quality, role
profiles and recruitment
practices for
improvement. 
Review of key talent
pools and progress
further development of
pools at
Service/Council level.
Training & awareness
of workforce Planning
Processes and benefits
of data usage.
Development of
Workforce Planning
Console to incorporate
employee data
improvements relating
to recruitment & on-
boarding.
Skills passport includes
workforce planning
training; framework,
console and tools.
Development of key
Career Pathways with
links to Learning
pathways and
training/development
plans.
Succession Planning
with improved links to
development
opportunities and
Leadership
Development.
Further development of
internal talent pools 
Promotion of personal
and professional
development through
Improved use of Be the
Best (and other
conversations) with an
emphasis on quality of
information to inform
Workforce Planning for
a focus on skills
development, individual
career aspirations and
future requirements. 
Links to employee
retention and
development data to
enhance Scenario
Planning and impact on
team and structures.
Build and promote
coaching & mentoring
Consider promotional
opportunities at Service
Level as positive place
to work informed by
data analysis.
Develop and further
analyse exit interview
information and
destinations of leavers
to inform WFP actions
including role/structure
design and
development
opportunities.
Relevant benchmarking
scoped for WFP actions
relating to retention.
Page 259

Page 260

Targeted attraction and
recruitment (including
increasing
diversification of the
Workforce)
Consideration of
promotion opportunities
for Careers within the
council. 
Review the Internal job
market with a focus on
succession planning,
secondments and
redeployment potential
ensuring effective use
of the Switch Policy.
Better use of Scenario
Planning.
Support promotion of
human centred
management.
Increasing use of
equalities information to
inform decision making
in relation to Workforce
Planning.
the Workforce Planning
channels including 
data gathering on
personal and
professional skills.
Workforce Planning
Policy, Strategy and
processes informed by
data and adapted
accordingly.
opportunities into
Workforce Planning
strategies.
Support to build digital
and data skills as
integrated action of
WFP.
Improved use of market
analytics to inform
areas of risk for
retention.
Continued improvement
to link WFP actions to
the Strategic direction
of the organisation and
culture of change for
continuous
improvement
Further develop
workforce analytics in
relation to turnover to
predict areas of risk and
inform of strategies to
retain. 
Support methodologies
to encourage returners
for those who leave to
develop career in
another organisation.
Page 260

Page 261

1. Workforce Planning Framework Actions 2022/23
Workforce Planning Actions Resources
needed
Measure of Outcome Due Date Assigned To
Further Embed Workforce Planning with Services
including regular reviews. Establish Workforce
Plans Strategically aligned to service delivery plans
and progress reported in line with these plans.
Managers Service have Workforce plans in place
embedded in Service Delivery Plans
31-Mar-
2023
Lisa
MacGregor 
other People
& Change
Partners
Review Workforce Planning Framework/Plan to
incorporate 5 year period in line with People First
Strategy
Manager Revised 5 year Workforce
Framework/plan in place linked to
Strategic Priorities
01–Feb -
2023
Lisa
MacGregor
Engagement with Services of Revised
Framework/Plan including knowledge transfer.
People &
Change &
Managers
Service are able to undertake and
maximise effective use of workforce
planning.
From 01-
Mar-2023
Lisa
MacGregor &
other People
& Change
Partners
Further development of WFP Console with Focus
on workforce projections, establishment/finance
data, exit and equality data.
People &
Change and
WFP console
support
Console functions and data are further
developed to include higher level of
equality and leaver information.
Progress made in relation to the
scoping and implementation of
projective data and embedded use by
service managers.
31-Mar-
2023
Lisa
Macgregor 
Development of information feeding channels to
ensure service level workforce planning reflects
People First Strategy Plan and Service level
outcomes influence People First Plan activity to
meet service requirements.
People &
Change Team
& Managers
Actions in WFP and People First plans
reflect feedback, requirements and
needs met.
On-going
over 5
year plan
People &
Change
Team
Page 261

Page 262

Page 262

Page 263

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People and Technology
Corporate Services Committee: 2 November 2022
___________________________________________________________________
Subject: Bi-annual Workforce Monitoring Report 
1. Purpose
1.1 The purpose of this report is to provide workforce monitoring information
relating to the period 1st April 2022 to 30th September 2022.
2. Recommendations
2.1 The Committee is asked to note the content of the report.
3. Background
3.1 This report provides information on the workforce demographic, allowing for
monitoring of trends and consideration of workforce impacts.  Additionally, the
report includes analysis of employees released through early retirement and
voluntary severance, and the associated costs.  This forms part of the
ongoing monitoring process derived from the Audit Scotland Report “Bye now,
pay later?” and follow up reports.
4. Main Issues
4.1 Table 1 provides headcount data for the Council per Chief Officer Area and
includes apprentices, fixed term and permanent employees. When compared
with the previous reporting period (1st October 2021 – 30th April 2022), the
total headcount for the Council has decreased by 81.  This is accounted for by
decreases of 30 fixed term contracts and 60 permanent contracts.
Apprenticeship contracts increased by 9 over the monitoring period.
4.2 When compared to the same period last year the headcount has decreased
by 94 overall. This is due to reductions of 4 apprenticeships, 56 fixed term
contracts and 34 permanent contracts. The casual headcount has decreased
by 9.
4.3 Different to previous periods, these figures reflect a shifting picture as the
organisation adjusts its’ workforce in response to significantly reduced levels
of funding.
ITEM 17
Page 263

Page 264

Table 1 – Headcount Data (as at 30th September 2022)
4.4 Monitoring the number of casual workers (including supply) is undertaken on a
bi-annual basis and reported to the Performance and Monitoring Review
Group.  This ensures that the use of casual workers is in line with good
practice while continuing to support the needs of organisational delivery. We
also refresh the list on an annual basis removing those not used and/or no
longer wish to provide casual work.
Early Retirements and Voluntary Severance
4.5 During the last 6 months, no one was released through Early Retirement /
Voluntary Severance.  
4.6 The number of employees being released through voluntary early
retirement/severance has continued to reduce in recent years with none being
released during the current period. 
Table 2– ER/VS (Comparison to Previous periods)
Council Wide 1 October 2020
– 31 March
2021
1 April – 30
September
2021
1 October
2021 – 31
March 2022
1 April – 30
September
2022
TOTALS 1 0  0 0
Retirement from age 55
4.7 The Local Government Pension Scheme allows scheme members to retire
from age 55 without employer consent. The terms of this provision allow
Headcount as at 30/09/2022 Status
Department Service Apprentice Fixed-Term Permanent Grand Total Casual
Chief Exec Office CitizenCultureFacilities 2 28 634 664 10
Educ Learning & Attain 8 84 951 1043 66
Housing & Employability 3 63 280 346 3
People & Technology 1 4 93 98 0
Regulatory&Regeneration 0 11 106 117 4
Resources 0 20 224 244 0
Roads & Neighbourhood 12 67 337 416 9
Supply,Distribu&Property 37 10 391 438 0
Chief Exec Office Total 63 287 3016 3366 92
HSCP Child Health Care & C J 0 23 242 265 17
Community Health & Care 0 26 917 943 53
Finance & Resources 0 1 5 6 0
Mental Health Addic & LD 0 14 139 153 1
Strategy, Planning & HI 0 1 26 27 0
HSCP Total 0 65 1329 1394 71
Strategic Management Strategic Management 0 0 12 12 0
Strategic Management Total 0 0 12 12 0
Teachers Educ Learning & Attain 0 145 918 1063 323
Teachers Total 0 145 918 1063 323
Grand Total 63 497 5275 5835 486
Headcount for Comparison Purposes
Sep-22 63 497 5275 5835 486
Mar-22 54 527 5335 5916 399
Sep-21 67 553 5309 5929 495
Mar-21 73 552 5318 5943 519
Page 264

Page 265

members to access their pension benefits with an actuarial reduction applied
(to compensate the fund for the member taking their benefits early). There are
no consequential costs for the council.
4.8 Within this reporting period (1st April – 30th September 2022), 6 employees
retired under this provision. 1 application was received during the period and
is currently being progressed. This will be reported in the next monitoring
period.
Table 3 – Retirement from age 55+ (Comparison to Previous Periods)
Council Wide 1 September
2020 – 31
March 2021
1 April – 30
September
2021
1 October
2021 – 31
March 2022
1 April – 30
September
2022
TOTALS 4 0 5 6
Early Retirements - Ill-health
4.9 In cases of early retirement on the grounds of ill-health, there are no direct
capitalisation costs to the Council as this cost is borne by the pension fund.
4.10 The Local Government Pension Scheme and Scottish Teachers Pension
Scheme regulations allow for 2 tiers of ill-health retirement in situations where
the member’s ill-health or infirmity of mind or body renders them permanently
incapable of discharging efficiently the duties of their current employment. 
Under Local Government Pension Regulations Tier 1 relates to members with
no reasonable prospect of obtaining gainful employment before the age of 65.
4.11 Tier 2 relates to members with a reasonable prospect of obtaining gainful
employment before the age of 65.  Under Scottish Teachers Pension Scheme
Regulations the two tiers are Total Incapacity Benefits which relates to
members who are unable to teach and whose ability to carry out any work is
impaired by more than 90% and is likely permanently to be so. Partial
Incapacity Benefits relates to members who are permanently unable to teach
but be capable of undertaking other types of employment.
4.12 Table 4 below shows the number of employees who retired early on ill health
grounds.  In the period 1st April – 30th September 2022 there were 15 ill health
retirements; 12 were approved at Tier 1 (Total Incapacity Benefits) and 3 at
Tier 2 (Partial Incapacity Benefits). The total number of ill health retirements
for the previous three reporting periods is also included for comparison
purposes. 
Table 4 – Ill Health Retirements (Comparison to previous periods)
Directorate Total 1 October
2020 – 31
March 2021
Total 1 April
2021 – 30
September
2021
Total 1 October
2021 – 31
March 2022
Total 1 April –
30 September
2022
HSCP 5 9 *7
8
Remainder of
Council 0 4 7
TOTAL 5 13 17 15
Page 265

Page 266

*In accordance with data protection regulations directorates with 2 or fewer employees will
be merged.
4.13 The female / male split of employees awarded Ill Health Retirement is 53%
female and 47% male. This is higher for male employees but lower for female
employees than the overall Council demographic split of 72.76% female and
27.24% male.
4.14 The demographic trend indicates the age range of employees awarded Ill
health Retirement during this period between 60-65 years is at 47% a slight
increase from last period. Compared to last period the age range of 50-54
years has risen from 14% in March 2022 to 33% in this reporting period. The
age range 55-59 has decreased from 43% in March 2022 to 20% in this
reporting period.
Table 5 – Ill Health Retirements Age Range (Comparison to previous periods)
Period Age
Range
50-54
(No.)
Age
Range
50-54
(%)
Age
Range 55-
59 (No.)
Age
Range
55-59
(%)
Age
Range
60-65
(No.)
Age
Range
60-65
(%)
Total
Sept
2022
5 33% 3 20% 7 47% 15
March
2022
1 14% 3 43% 3 43% 7
Sept
2021
0 0 4 30% 9 70% 13
March
2021
2 28.5% 2 28.5% 3 43% 7
4.15 Employees have the right to appeal consideration for ill-health retirement if
they are not satisfied with the decision through the Internal Disputes
Resolution Process. 
4.16 There were three appeals lodged at Stage 1 during the reporting period. One
was referred back to Occupational Health for another  opinion and the appeal
was subsequently rejected. The second appeal was upheld and an award
made in relation to flexible retirement. The third has been referred to
colleagues in Scottish Pension Fund Office for their consideration and
feedback is awaited. 
4.17 There was one appeal being considered at Stage 2 by the Scottish Ministers
from the previous period but the outcome remains outstanding.
Flexible Retirement
4.18 Flexible retirement is available to members of the Local Government Pension
Scheme, excluding teachers.  The approval of those employees granted
flexible retirement is monitored by the Chief Officer - People and Technology
and the Chief Officer - Resources.  
Page 266

Page 267

4.19 A total of 25 new requests were received between 1st April – 30th September
2022. Of the planned retirement dates 3 fall within the current period and 22
fall within the next reporting period.
4.20 Of the planned retirement dates that fell within the current period 19 offers
were issued and all were accepted. There is currently 1 Flexible Retirement in
progress that will require a change of date meaning it will now fall into the next
reporting period. One employee withdrew their request. 
4.21 Every effort is being made to support flexible retirement requests where
possible and services regularly revisit applications with a view to release.
4.22 The table below shows the number of flexible retirements released in the
period, split by Chief Officer area for this year and previous three reporting
periods for comparison purposes. 
4.23 There has been a continued uptake for flexible retirement this period and for
the year overall. It is anticipated that Flexible Retirement will continue to be a
popular option for employees who wish to work in a reduced capacity and
access their pension whilst enabling the Council to retain their skills and
experience. 
Table 6 – Flexible Retirements (Comparison to previous period. Please note the change to
reflect the new Chief Officer Areas)
Chief Officer Area
1 October 2020 – 31
March 2021 Chief Officer Area
1 April 2021 – 30
September 2021
HSCP 9   HSCP
*10
Remainder of
Council
*7
Remainder of
Council
TOTALS 15 TOTALS 10
Chief Officer Area
1 October 2021 – 31
March 2022 Chief Officer Area
1 April – 30
September 2022
HSCP 13   HSCP *5
Remainder of
Council
*15  Remainder of  
Council *14
TOTALS 28 TOTALS 19
* In accordance with data protection regulations directorates with 2 or fewer employees will
be merged.
Redeployment
4.24 Redeployment is monitored and delivered centrally by Strategic HR.
Employees are added to the SWITCH register for a number of different
reasons:-
Page 267

Page 268

• Through organisational change employees may be displaced or placed
in lower graded posts;
• Due to ill-health they may become unable to continue in their
substantive post;
• Through Job Evaluation where a post is evaluated lower than the
current grade;
• Or where an employee is coming to the end of a fixed term contract
and has more than 2 years’ service.
4.25 To support employees to return to their previous rate of pay all employees
who have been matched but remain on pay protection are also retained on
the register.
4.26 The table below details the number of employees who were on the
redeployment register at the start of the reporting period (01/10/2021), the
number who joined the register during the reporting period and the number
who remain on the register at the end of the reporting period (31/03/2022). 
Table 7 Redeployment (Comparisons to previous periods)
Reason Number of
employees on
the register at
the start of the
period
(1/04/2022)
Number of
employees
added during
the period 
Number of
Employees
removed
during the
period
Number of
employees on
the register at
end of the period
(30/09/2022)
Ill Health
(Capability)
0 0 0 0
Ill Health
(Disability)
1 0 1 0
Organisational
change
9 1 4 6
Incapability
another
process
1 0 0 1
TOTALS 11 1 5 7
Pay protection *9 3 1 11
*pay protection is shown separately as this may be related to job evaluation or organisational
change
4.27 As detailed in Table 6, there were 11 employees on the redeployment register
at the beginning of the reporting period. One employee joined during the
period and 5 employees were removed from the register. One left the Council
for other employment and four were placed in to roles on their substantive
grades. 4 employees are currently on Long Term Sick Leave.
4.28 11 employees currently remain pay protected and on the SWITCH Register
until they secure a post either on what was their substantive grade or the
protection period ends, whichever is earlier. Support to obtain a post on their
original grades continues to be provided across the Strategic Human
Resources Team. 
4.29 One employee in receipt of pay protection has been removed from the
register completely due to securing a permanent position on their substantive
grade; 3 of the 5 employees who were in promoted posts on a temporary
Page 268

Page 269

basis have returned to their positions on reduced grades and pay protection
has been re-started until the end of the pay protection period, 7th February
2023. 
5. People Implications
5.1 There are no direct people implications for employees arising from the
information presented in this report. However, it is important that the matters
covered in this report are effectively monitored in line with employment
legislation, the discretions policy and best practice.
6. Financial and Procurement Implications
6.1 There are no procurement implications with this report.  All costs associated
with early retirement or voluntary severance will be met from existing
resources.  Those released are done so on the basis of robust cost benefit
analysis.
7. Risk Analysis
7.1 The early release of employees across the Council requires to be properly
managed to minimise the risk of adversely impacting service levels through
the loss of vital skills and experience.  In line with Council commitment,
redeployment of employees continues to be considered as a priority.
8. Equalities Impact Assessment (EIA)
8.1 This report does not introduce a new policy, function or strategy or
recommend a change to an existing policy, function or strategy and therefore
no equalities impact assessment is required.
9. Consultation
9.1 Consultation has taken place in line with agreed policies and procedures
10. Strategic Assessment
10.1 Undertaking workforce monitoring will support the Council’s aim to make the
best use of both financial and human resources resulting in a positive impact
upon service provision. 
Victoria Rogers
Chief Officer – People and Technology
Date: 
Person to Contact: Louise Hastings, 16 Church Street, Dumbarton
Tel:  07792321839
Email: Louise.Hastings@west-dunbarton.gov.uk
Appendices: None
Page 269

Page 270

Background Papers: None
Wards Affected: N/A
Page 270

Page 271

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Corporate Services Committee : 2 November 2022
___________________________________________________________________
Subject: Strategic Risks 2022-2027
1. Purpose
1.1 To set out proposed changes to the strategic risks for 2022-2027 following the
Strategic Plan developments.
2. Recommendations
2.1 It is recommended that the Committee agree:
• The strategic risks as detailed at Appendix 1
3. Background
3.1 The Council’s 2017 – 2022 Strategic Risks came to a natural end on 31st
March 2022. Following a review, new risks have been developed, as well as
revisions to existing and proposed deletions of those no longer required.
Table 1 includes details of risks to be carried forward into the next five year
plan and those that are being retired. Table 2 includes details of the full suite
of Strategic Risks proposed for 2022-2027.
3.2 The appended risks have been fully reviewed and re-assessment will be
undertaken bi-annually before being reported to this committee. This report
will also be submitted as agreed to the Audit Committee on a bi-annual basis.
4. Main Issues
Strategic Risk
4.1 In line with the Council’s Risk Management Framework, an assessment of the
Strategic Risks has taken place as detailed within Appendix 1. Each risk is
managed through internal controls, linked actions and associated milestones
with the objective being to reduce or stabilise the level of risk through
completion of linked actions over a period of time and / or ensure mitigation
factors are adequate should the risks actually materialise. 
4.2 Table 1 represents a risk dashboard that includes information on the 2017-22
Strategic Risks. This gives information on the original risk rating, risk rating at
completion of the Strategic Plan 31st March 2022 and the target rating. This
ITEM 18
Page 271

Page 272

will also highlight those risks that have been retired and won’t be carried
forward into the 2022-2027 Strategic Plan. Four Strategic Risks met their
target, a further four progressed and were close to reaching their assigned
targets. Four risks were off target and unlikely to reach their intended
outcome.
Table 1 Key Strategic Risk Information 2017 -2022
Strategic Risk Original
Risk 2017
*2020 for SR012
Pandemic
Risk on 31st
March
2022
Target Risk
2022
Recommendation
for  2022-27 
SR 001  Significant
financial funding
reductions /
limitations from
Scottish Government
Continue
SR 002 School
improvements. Continue
SR 003 Council
Assets. Continue but split
into 3 
SR 004 Information
Technology. Continue
SR 005 Partnerships.
Continue but
combine with
SR006 
SR 006 Citizens and
Communities.
As above
SR 007  Health and
Safety of Employees
and Others Continue
SR 008 Cyber
Attack.
Continue
Page 272

Page 273

Table 2
Table 2 represents a risk dashboard that includes information on the new 2022-27
Strategic Risks. This gives information on the current rating and target rating.
SR 009 Early Years
Agenda.
Retire
SR 010 Resourced
Workforce.
Continue
SR 011 EU Exit
Retire
SR 012 Pandemic
(COVID)
Retire
Strategic Risk Current
Risk 2022
Target Risk
2027
Risk Status
SR 001  Significant
financial funding reductions
/ limitations from Scottish
Government
SR 002  Challenges in
implementing broad-
ranging school
improvement to raise
attainment and
achievement 
SR 003  Maintaining
Council Assets that are fit
for purpose
SR 004  Keeping abreast
of developments in the
innovative use of
Information Technologies
Page 273

Page 274

SR 005  Engaging
positively with Residents,
Communities &
Partnerships
SR 006  Challenges in
protecting the Health and
Safety of Employees and
Others
SR 007  Complexities in
ensuring an appropriately
resourced and resilient
workforce
SR 008 Threat of Cyber
Attack
SR 009  Challenges in
delivering effective services
in relation to Roads &
Neighbourhoods
SR 010  Failure to
maintain Housing Stock
SR 011  Inability to reduce
carbon footprint in line with
targets
Page 274

Page 275

Risk Methodology and Reporting
4.3 Each strategic risk is populated in Pentana in terms of the following template:
• Risk title and code;
• Description;
• Ownership;
• Potential effect;
• Measures of impact;
• Risk factors;
• Internal controls;
• Risk opportunity; and
• Linked actions.
4.4  Each risk has been scored using a “4 x 4” matrix for likelihood and impact in
relation to:
• Current risk (with review dates set at pre-determined intervals); and
• Target risk (i.e. 31 March 2027 - the duration of the Strategic Plan).
The risk descriptors used in the “4 x 4” matrix are as follows:
Likelihood 
Score Descriptor
1 Unlikely
2 Likely
3 Very likely
4 Certain
Impact
Score Descriptor
1 Minor
2 Moderate
3 Significant
4 Critical
4.5 For ownership, each strategic risk is “Managed By” a Chief Officer and
“Assigned To” a Senior Officer. Strategic risks are also reported on a bi-
annual basis to the Performance & Monitoring Review Group.
Service Risk
4.6 Following the methodology in 4.3 to 4.4 above, each service has service
owned operational risk registers in Pentana; these will be fully reviewed
through the 2022/23 service planning process alongside development of the
Council’s next five year strategic plan.
Page 275

Page 276

4.7 Failure to implement broad-ranging school improvement to raise attainment
and achievement SR002 
SR002 did not reach its intended outcome due to the pandemic period. 
The pandemic affected national and local outcomes in education attainment
and equity due to periods of school/ ELC closure; absence due to Covid and
shielding. The risk reporting period ended on 31st March 2022 and The
Education Service had a recovery strategy for attainment in place. This
needed a full academic year (August 2021 to June 2022) to have an impact
on attainment although employee and pupil absences due to Covid were still
being experienced. However, in academic session 2021/22, a narrowing of
the attainment gap and increase in attainment was achieved in the attainment
levels in the Broad General Education at primary level.
4.8 Threat of Cyber-attack SR008
SR008 did not reach its target rating, due to a number of factors. The cyber
threat continues to evolve with Ransomware being the biggest threat even
during this period of Geo-political instability. Work has been undertaken to
continue securing the Confidentiality, Integrity and Availability of our data and
has resulted in procurement and implementation of new technologies such as
scanning and remote control for end user device support alongside new
processes for contact with end users have also been implemented to address
some of the challenges.  New ways of working, including increased remote
access users, robotic process automations, digital transformations and
adoption of Cloud based technologies all have an impact on the risk profile of
the organisation and ICT continue to work with service areas to reduce and
mitigate emerging risks. Lack of user awareness within organisations still
remains one of the biggest Cyber Security threats, with a visible increase in 
Voice Phishing attempts being seen throughout the organisation. To combat
this we have resumed physical training events to Elected Members, the Joint
Consultative Forum and senior management within the Council.  Face to face
cyber security training combined with DPA and fraud awareness sessions has
also resumed as part of the OD and change learning offerings, these have
been well attended. 
Work continues to take place to improve our security posture in line with the
national Public Sector Action plan (PSAP) and Public Sector Network (PSN)
compliance. Vigilance of the National Cyber Security Centre (NCSC) Cyber
Security guidance continues to remain in place in light of any changes
regarding the geopolitical instability in Ukraine and the surrounding areas’
Page 276

Page 277

4.9 Retired Risks
4.9.1 SR009 Failure to Deliver the Early Years Agenda, SR011 EU Exit and SR012
Pandemic (Covid) have all been retired.
SR 009 is being retired as the entitlement was met in May 2021 and the
Council have met the Statutory Consultation requirements but, the quality of
Early Learning Centre (ELC) and curriculum delivery of the new model will be
closely monitored and supported by the central early years’ team. Outdoor
expansion projects at various locations will be completed in the next few
months. Additional projects are at various stages of planning/implementation:
- Linnvale ELCC planning in place, building warrant and start date
required
- St Mary’s ELCC Alexandria – planning in place, building warrant
and start date required
- Christie Park Primary School – plans have been drawn up.
-
In respect of levels of success, 40 ELC settings (including 11 funded partner
providers) have all been evaluated at good and above and meet the national
standard criteria. 10 ELC were inspected by the Care Inspectorate between
August 2021 and August 2022; evaluative grades awarded were good and
above. None of the services were evaluated below the level of good.  There is
evidence of strong improvement and quality of provision at the 10 ELC in the
sample of inspections last session. Published reports provide detailed
evidence and answer key questions: How good is our care, play and learning?
How good is our setting? How good is our leadership? and How good is our
staff team?
4.9.2 SR011 is being retired. The UK has left the EU and although it remains
important to acknowledge ongoing uncertainty, the incorporation of impacts is
included in core risk frameworks. This allows the impacts of EU Exit to be
monitored while increasing the efficiency/ effectiveness of the ongoing overall
risk monitoring process. The risks are continuing to be monitored
appropriately. If any particular area grows again in the future, the approach
will be adapted to fit. The plans will similarly be stood down. 
4.9.3 SR012 is being retired. There is no longer any national management of covid-
19. All covid-19 rules and restrictions have been lifted in Scotland. Masks are
no longer required (other than in some health care settings), the Health &
Safety Executive (HSE) no longer require covid-19 cases to be reported and
there is an annual booster programme in place for certain groups. The Council
has a resilience plan in place which can be lifted if necessary. The Scottish
Government have in place a Covid Recovery Strategy: for a fairer future. The
strategy focuses on the efforts required to tackle inequality and disadvantage.
It will bolster the actions in the – NHS Recovery Plan, Education Recovery
Plan and Justice Recovery Plan. 
4.10  Following consultation with risk owners and a review of the proposed Strategic
Plan and Priorities 2022-2027, the development of a new risk surrounding the
Page 277

Page 278

Council’s targets in relation to our Carbon footprint was agreed ‘SR011
Inability to reduce carbon footprint in line with targets’. This target has been
developed in a way that mirrors the emission reduction trajectory set by the
Scottish Government in light of the Climate Emergency and visibility of our
efforts to achieve these targets is important.
4.11 Council Assets has been split into three separate risks: ‘Challenges in
delivering effective services in relation to Roads & Neighbourhoods’, ‘Failure
to maintain Housing Stock’ and ‘Maintaining Council Assets that are fit for
purpose’ This will allow a more focussed analysis of these risks and the
mitigations in place to effectively manage them.
5. People Implications
5.1 There are no people implications associated with this report, other than in
relation to the mitigation of risks
6. Financial and Procurement Implications
6.1 There are no financial and/or procurement implications directly associated
with this report however there are in relation to the expenditure linked to
mitigation.
7. Risk Analysis
7.1 Failure to ensure robust risk management is likely to result in the Council
being criticised by External Auditors for not having an integrated approach to
embedding risk management within the authority with the result that a “no
scrutiny required” status would not be achieved.
7.2 Progressing with a robust risk management approach will demonstrate that
the Council is taking ownership of risk management and ensuring effective
measures are in place.  The ability to demonstrate risk ownership should
benefit the Council in terms of:
• Understanding risk and its potential impact on the Council’s priorities and
objectives;
• Reducing insurance premiums going forward by recognising that a mature
approach to risk management will contribute to a reduction in the number
and value of claims across a range of insurance classifications;
• Contributing towards incident prevention based upon post-incident
investigation;
• Meeting statutory/regulatory requirements; and
Ensuring better partnership working with external and internal partners.
8. Equalities Impact Assessment (EIA)
8.1 EIA 548 notes the positive impacts of an approach to risk that integrates
Page 278

Page 279

considerations on equalities, human rights health and social and economic
impacts, that is aligned with the content of the new Strategic Plan.
9. Consultation
9.1 The strategic risks have been discussed with the Chief Officers and senior
management. The reports to committee are available to the Trades Union and
consultation undertaken as required.
10. Strategic Assessment
10.1 The Council will agreed its main strategic priorities for 2022-27 at its meeting
on 26 October 2022. Due to timelines this report will be submitted prior to this
meeting. However the proposed priorities are:
• Our Communities  - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy  -  Strong and Flourishing
• Our Council - Inclusive & Adaptable
10.2 The strategic risks have been identified to complement the main strategic
priorities.
Name:    Victoria Rogers
Designation:   Chief Officer People & Technology
Date:  7 October 2022
Person to Contact: Anna Murray, Risk & Health and Safety Officer
Email Anna.Murray@west-dunbarton.gov.uk
Appendices: Appendix 1: Detailed Strategic Risk List
Background Papers: Dunbartonshire Council Strategic Plan DRAFT 2022-
2027 (once available)
Risk Management Framework
EIA screening
Page 279

Page 280

Page 280

Page 281

Strategic Risk Report
Generated on: 14 October 2022
SR 01 Significant financial
funding reductions /
limitations from Scottish
Government
It is expected that the Council will be faced with significant ongoing funding
reductions/limited increases from the Scottish Government settlement. This is
based on recent settlements, the March 2022 Resource Spending Review
which states that Council funding will remain as ‘flat cash’ (at current
2022/23 levels) until 2025/26 with a £100m added in 2026/27 – the real
term impact of this (taking inflation into account) for the next four years is a
7% reduction between 2022/23 and 2026/27.   This coincides with a period
where costs are expected to rise in relation to social care due to an aging
population; inflationary increases with RPI at a level not seen since 1991;
post-COVID-19 ongoing costs; increases in the cost of borrowing as interest
rates increase and pay award pressures linked to inflation. The ongoing
population decline of West Dunbartonshire versus the average population for
the whole of Scotland leads directly to funding reductions with marginal
impact on service delivery cost/need. On a UK wide level September 2022
announcements in relation to changes in taxation by the UK Government may
result in a reduction in public spending in order to fund these changes and it
remains to be seen if this has an impact on the money made available for
local government service delivery.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
04-Oct-
2022 12 31-Mar-2027 4 Gillian McNeilly
Potential Effect Shortfall in finances and therefore the Council is unable to provide all services as intended.
Measures of
Impact
- Reduction in government grant
- Demographic change (population decline/growth, aging population)
- Cost reduction required including cutting level and/or quality of service provision
- Increased Debt (collection of Council Tax, HRA rents, etc)
Risk Factors
- Level of government grant
- Lack of time to plan for changes in the level of grant funding due to single year settlements and
settlement information from Scottish Government
- General inflationary factors
-Bank of England Base Rate increases
-ongoing prevalence and impact of COVID-19
- Significant additional burdens
- Capital receipts
-EU Exit
Internal Controls
- 10 year Financial Strategy subject to regular review
- Monitor and maintain General Services and Housing Revenue Account prudential targets
- Reporting and monitoring of Treasury Management Strategy
- Budgetary control process
- Regular budgetary control and savings monitoring reports provided to CMT and Council / committees
- Rigorous debt collection processes
- Annual Internal Audit Plan
- Work of External Auditors (external control) - Annual Governance Statement - Procurement Improvement
Plan
Latest Note
As reported to the Council on 9 March 2022 the Scottish Parliament Information Centre (SPICE) analysis of
the UK Budget highlighted that the total (unadjusted) Scottish block grant will increase from £36.7 billion
(excluding COVID funding) in 2021/22 to £41.8 billion by 2024/25. This is a 2.4% real terms increase over
the period of the Spending Review however this increase is front loaded, with a 7.7% real terms increase in
2022/23 (10.6% cash terms increase) followed by small percentage real term reductions in the following
two years. Despite the 10.6% cash increase in the Scotland Block Grant in 2022/23 the Council’s general
revenue grant in 2022/23 was virtually flat cash. As a flat cash allocation has occurred in the year where
the Scotland Block Grant has increased significantly, and future year cash increases are far lower it is
almost certain there will be reductions to Local Government funding in future years.
Appendix 1
Page 281

Page 282

Risk Opportunity
- Annual exercise to identify efficiencies
- Projects to implement new ways of working (e.g. digitisation, asset management) - Enhance the
reputation of the Council as an organisation which manages its finances soundly
Linked Actions Code & Title Progress Status Assigned To
RES/22-23/011 Review financial arrangements against the CIPFA
financial code of practice Gillian McNeilly
WFP/22-23/RES/03 Implement service review process including role
design, use of new technology and new ways of working to add resilience,
address gaps, and establish opportunities for efficiencies
RES/22-23/010 Review capital programme, monitoring and reporting Gillian McNeilly
RES/22-23/012 Maximise automation opportunities across the
organisation to improve efficiency Arun Menon
RES/22-23/001 Review ways of decreasing corporate debt through
continued improvements to debt collection processes in relation to
sundry, NDR, Council Tax and rent
Ryan Chalmers
RES/22-23/002 Review ways to improve rent collection rates in
conjunction with Housing and W4U
Ryan Chalmers; Stefan
Kristmanns
SR 02 Challenges in
implementing broad-ranging
school improvement to raise
attainment and achievement
This risk concerns the delivery of excellence and equity for our young people
to support them to attain and achieve at the highest level. In particular, it is
aimed at bridging the attainment gap and breaking the cycle of disadvantage.
This also includes the focus on intervention at early years to improve life
chances at all points on the learning journey.
A key national and local priority is to accelerate progress with the aspirations
to deliver improved attainment, tackle the poverty related attainment gap
and recover from any negative impact of the pandemic. Scottish Equity
funding devolved to local authorities aims to deliver on priorities between
2023-26.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
04-Oct-
2022 6 31-Mar-2027 2 Julie McGrogan
Potential Effect
The national expectation for education would not be delivered. Improved outcomes for young people would
not be attained and achieved. The Council would fail to meet the needs of individual learners. The Service
would fail to bridge the attainment gap and break the cycle of disadvantage. The Council would fail in its
legal duty for the education of young people within West Dunbartonshire. There would be reputational
damage to the service and the wider Council. There would be a lack of income generation from external
funding sources.
Measures of
Impact
Examination results - Her Majesty’s Inspectors of Education inspection reports - validation reports -
stakeholder feedback - local learning community attainment data - control group model - small test of
change model - risk matrix model - bespoke model of intervention for young people and families at early
stages to improve on attendance/lateness; social and emotional health; supports for mental health issues;
parenting/behaviour management skills and early linguistic & cognitive development - pre/post
intervention assessment - increased expectation of raising attainment being the responsibility of all -
school to school collaboration with locally initiated bottom-up enquiry - higher level of Science Technology
and Maths subject uptake in secondary schools - increased numbers of learners entering STEM related
career pathways - standardised literacy and numeracy tests
Local authority stretch aims to be delivered by 2023; and monitored by national agencies against national
benchmarks.
Risk Factors
Staff resources - adequate funding for projects - workforce development - effective leadership - accurate
and timely data collection - accurate and timely reporting - effective communication with partners and
external agencies - disrupted learning - staff absence - pupil absence - adapted model of delivery to ensure
safety - limiting curriculum flexibility - learning style flexibility - impact of COVID on social and emotional
wellbeing - risk to funding streams.
There is a change to the local authority funding model for Scottish Equity Fund (SEF) with an annual
tapered reduction of funding to WDC between 2022-2026. This will reduce resources available to deliver
work streams related to SEF.
Page 282

Page 283

Internal Controls
-Raising Attainment Strategy
-Project management by Senior Education Officer
-Education Improvement Board chaired by Chief Education Officer
-Scrutiny by Scottish Government and Education Scotland (progress reports produced and submitted)
-WDC Improvement Framework
-Termly progress reports submitted as part of Educational Service committee reports
-Relevant Continuous Professional Development programme to support education staff
-Meetings between WDC and Education Scotland/Her Majesty's Inspectors of Education
-BGE Attainment and Performance Data
-Literacy, Numeracy and HWB Steering Group
-National Improvement Framework (NIF)
-Education Recovery Plan
Latest Note
Building on achievements made since 2015 the service is developing plans to both accelerate and embed
progress in academic sessions 2021/22 and 2022/23, these plans are being reviewed to reflect the
refreshed SAC programme. The key risk to ongoing progress is SG's plan for a tapered SAC funding model
between 2022 to 2026.
In academic session 2021/22, a narrowing of the attainment gap and increase in attainment was achieved
in the attainment levels in the Broad General Education at primary level.
Risk Opportunity
Improved attainment - improved attendance - reduced exclusions - reduced violent incidents - reduction
requirement for targeted support over time - reduction requirement for specialist placements over time -
improved learning & community engagement - children/pupils at risk identified earlier and more effectively
- more empowered community providing self-sustaining peer support - increase in the percentage and
range of positive destinations over time - increased access to digital learning resources
Linked Actions Code & Title Progress Status Assigned To
ELA/21-22/DP/01 Deliver the best start in learning Kathy Morrison
ELA/21-22/DP/03 Increase attainment and positive destinations Andrew Brown; Julie
McGrogan
ELA/21-22/DP/04 Review and improve support for reducing inequity Claire Cusick
ELA/21-22/DP/05 Develop empowered leadership to provide the highest
quality of learning and teaching
Claire Cusick; Julie
McGrogan
SR 03 Maintaining Council
Assets that are fit for purpose
The risk that the Council's assets and facilities are not fully fit for purpose
with consequent adverse impact on our ability to deliver efficient and effective
services. Assets included in this assessment are; the Council’s property
portfolio and open space
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
04-Oct-
2022 4 31-Mar-2027 2 Craig Jardine; Michelle
Lynn
Potential Effect
- Assets are not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
- Service users seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions -Council assets fail to meet relevant standards
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of asset base and facilities -Asset user satisfaction -
Operating costs and savings
Risk Factors
- Adequacy of funding available to improve asset base
- Adequacy of staff resources allocated to the area of asset management
- Council buildings/ assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts from surplus property sales - Increase
public liability claims
-EU Exit
Internal Controls - Corporate Asset Management Strategy (currently under review)
Page 283

Page 284

- Learning Estate Strategy
- Capital Investment Team
- Capital project meetings are carried out monthly in addition to project specific meetings.
- Property Asset Management Plan
- Capital plan
- Detailed asset database that shows relevant information on a
property by property basis in relation to operational, non-operational - Sustainability Policy
Latest Note
The current plan will continue into 2022/23 but this risk has been split into 3; Maintaining Council Assets
that are fit for purpose, Failure to maintain Housing Stock and Challenges in delivering effective services in
relation to Roads & Neighborhood. The new 5 year Corporate Asset Management Strategy and Property
Action Plan will be developed in 2022/23 to ensure it meets the aspirations of the new Strategic Plan. No
change to risk matrix.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council assets.
-Estate, assets and service delivery (e.g. new school buildings, operational building upgrades, office and
depot rationalisation projects)
- Enhance employee "feel good" factor by providing modern office accommodation equipped with up to
date IT facilities
-Improved satisfaction from public building users
- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- Prioritised Building Upgrade Plan - The effect of these energy efficiencies has demonstrated that
significant savings and environmental benefit can be achieved through the utilisation of developing
technology.
Linked Actions Code & Title Progress Status Assigned To
SD&P/22-23/CAM/04 Monitor the progress of disposal of key strategic
sites over 22/23 Craig Jardine
SD&P/22-23/CAM/03 Progress delivery of the Corporate Asset
Management Strategy to align with the Councils Strategic Plan Craig Jardine
SR 04 Keeping abreast of
developments in the innovative
use of Information
Technologies
Failure to keep pace with changing technology environment
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
29-Sep-
2022 2 31-Mar-2027 2 Patricia Kerr; Brian
Miller
Potential Effect
A lack of consistent, sufficiently robust service planning in respect of ICT arrangements is likely to result in
the Council being ill prepared to meet future demands in key service areas and lacking the capacity to
respond effectively to changing need such as increased requirement for remote working as identified during
covid pandemic.
Measures of
Impact
• Close relationship and working practices with Asset Management Service with regard to commissioning
and decommissioning buildings.
• Number of systems that have supplier maintenance contracts.
• Invocation of Service Business Continuity Plans and ICT Disaster Recovery plan
• Degree of compliance with security controls to prevent data loss through poor o/s patching, cyber attack,
firewall configurations, switch replacements/upgrades etc
• Fit for purpose primary and secondary data centres
• Extent of wireless connections in the Council network – all schools and refurbished Office accommodation
complete
• Number of ICT Help Desk incidents resolved within half day - exceeded the target for 2021-22 and higher
target set.
• Extent of functionality development in key Council systems (i.e. lack of development beyond base system
leading to ineffective management information) – several channel shift projects delivered and more are in
progress.
• Fit for purpose Council website, delivering information and services to a significant percentage of the
Council's customers.
• Provide efficient desktop services supporting laptops, chromebooks, PCs, Thin client terminals to meet
changing workforce flexibility and property rationalisation requirements.  5-year Device replacement
programme in place. 
• Implementation of mobile and flexible working, enabling a downsizing of required office accommodation
Page 284

Page 285

as people to work more efficiently and to adopt a more flexible policy towards office accommodation and
desk provision.
• Broadband speed in the Council area - WDC has 2nd highest broadband speeds in Scotland.
Investigating funding options for fibre network.
Risk Factors
• Insufficient resourcing of ICT developments so that benefits and opportunities identified are not realised
• poor network security controls implemented for example • Lack of intrusion detections alerts,
• failure to respond to audit / PSN test findings and recommendations,
• insufficient resources allocated to security tasks.  However Service redesign and ICT resources aligned to
security tasks and improved monitoring processes and tools as well as additional tools purchased to help
support remote working environment all help to mitigate this risk. 
• Poor Service Business Continuity Plans and/or Disaster Recovery Capability.
• Poor project and programme change management arrangements.
• Poor quality of mobile communication provision.
• Poor uptake on channel shift.
Internal Controls
- Capital programme established for technology refresh projects
- Information & Communication Technology (ICT) Policies such as ICT Security Framework
- Governance structures such as ICT Steering Board, Education ICT Steering Board, Digital Transformation
Board in place to support integrated planning and decision making in relation to ICT
- Use of both internal IT resources from across the Council and skilled specialist advisers in key areas - Fit
for purpose primary and secondary data centres
Latest Note
Sept 2022 - Replacement interconnect firewall between NHS and WDC now operational in Aurora house.
New rule sets in place as agreed with WDC and NHS IT Services
Microsoft Intune deployed to enable remote imaging of devices and goes live Oct 3rd.
Logemin went live August 22 and enables remote control of all devices including mobile phones.
Citrix Cloud Proof of concept in place and testing underway with ICT/service areas.
Progress continues on implementation of a new authentication method for public access wireless
Risk Opportunity
-COVID-19 has increased the number of users and services working remotely. Several manual processes
amended and driving process reviews across the Council. Opportunity to redesign infrastructure and
introduce new tools and security measures to support hybrid working environments.
- rapid deployment of conferencing technologies has helped drive demand and give visibility to importance
and suitability of digital technologies and processes
- annual network penetration tests and  for PSN compliance audit
- Annual External Audit on ICT Controls
- Continued investment in ICT infrastructure and its focus on network security and resilience.
- Provide appropriate technology for employees, pupils and service users as well as for ICT support teams
such as Logmein for remote device support and Qualsys for device vulnerability scanning.
- Rationalise IT systems
- Provide Council employees with secure access to email and supporting systems at times and locations of
choice as part of 365 project.
- Increased use of mobile devices eg tablet devices, chromebooks and mobile phones.
- Provide self service style systems to employees and the local community
Linked Actions Code & Title Progress Status Assigned To
P&T/22-23/ICT/03 Review and implement ICT processes and service
improvements  in line with new technologies James Gallacher
P&T/22-23/ICT/03 Upskill ICT team in new tools and processes James Gallacher
Page 285

Page 286

SR 05 Engaging positively with
Residents, Communities &
Partnerships
The risk that the Council fails to adequately engage, establish and maintain
positive relationships with local residents and communities in addition to
partnership bodies.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
04-Oct-
2022 3 31-Mar-2027 2 Clare English; Elaine
Troup
Potential Effect
Potential for tensions to develop with residents and local community groups
Reputational damage to council services
Degradation of trust in service provision A failure of strong partnerships could impact on the Councils
obligations under Community Empowerment Act
Measures of
Impact
Successful delivery of Local Outcome Improvement Plan (LOIP) and supporting plans positive partnership
inspections
Informed and engaged residents participating in consultation activity
Telephone survey monthly, quarterly and annual measures Increased social media engagement and reach
Risk Factors
Inability to deliver improved outcomes which require strong partnership activity
Council's reputation is adversely affected through a failed partnership arrangement
Lack of appropriate staff development / skills may be lacking to support new model of service delivery
inequity of engagement across the partnership on key local issues
Council seen as unresponsive to community if feedback from engagement not acted upon
Apathy within communities leads to little or no engagement Some community groups feel their voices are
not being heard
Internal Controls
Robust partnership arrangements through community planning partnership
Align the Council's strategic plan with the Local Outcome Improvement Plan (LOIP)
Ensure that partners have signed up to deliver on the outcomes and targets set in the LOIP
Develop data sharing protocols with partner agencies
Participate in reform agenda as it impacts on Council area
Ensure robust mechanisms for public feedback (Embedding the Strategic Engagement Framework)
Annual budget consultation events
Citizens Panel
Open Forum questions at Council meetings
Latest Note
Citizens & Communities & Partnerships were previously two separate risks but have been combined for the
next 5 year Strategic Plan. Whilst the Community Planning Partnership is now being managed under a
shared service agreement, it is well established with strong partnership working arrangements in place
reducing likelihood of this risk being realised. We continue to promote and ensure strong communications
and engagement through the Engaging Communities Framework. As well as gathering resident feedback,
we ensure that key information is communicated through a variety of media channels including online,
social media and publications such as Housing News.
Risk Opportunity
Position West Dunbartonshire as a modernising Council
Residents are more comfortable with the digital platform as a result of the enforced cessation of face to
face services - this presents an opportunity to modernise communication
Community Empowerment Act
Participation requests Asset transfer
Linked Actions Code & Title Progress Status Assigned To
H&E/22-23/CT/01 Build community resilience and advance community
empowerment including the development of a training programme to
support the Community empowerment agenda
Clare English
H&E/22-23/CT/03 Explore alternative forms of funding to encourage less
reliance on mainstream council funding Clare English
H&E/22-23/CT/04 Deliver the objectives set out in the Community
Empowerment Strategy and Action Plan through identified priority
projects
Clare English
H&E/22-23/CT/05 Lead on the Council’s approach to Participatory
Budgeting Mainstreaming across the organisation Clare English
H&E/22-23/CT/06 Develop an Employee Volunteering Policy to support
the ambitions of the Community Empowerment (Scotland) Act 2015 Clare English
Page 286

Page 287

H&E/22-23/CT/07 Identify and implement improvements in partnership
working between the CCTV team and key partners to promote feelings of
safety in the area
Clare English
SR 06 Challenges in protecting
the Health and Safety of
Employees and Others
Failure to meet the Council’s duty to protect the health, safety and welfare of
its employees and other people who might be affected by its business
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
28-Sep-
2022 4 31-Mar-2027 4 Alison McBride
Potential Effect
Risk of an employee, service user, pupil (young person) or member of the public being seriously / fatally
injured by fault of the Council. There are various risks associated with the outcome: reputational risk
regarding negative publicity; financial risk in terms of claims management compensation to the injured
party; risk of prosecution by the HSE resulting in a fine and/or a Council Employee being subject to
criminal charges.
Measures of
Impact
Resources associated with in-house/HSE investigation. Service delivery impact in terms of injury-related
absence and potentially enforced cessation of work activities. Impact of injury on employees/members of
the public, legal proceedings, financial penalties, potential reputational damage and risk of criminal
charges.
Risk Factors Lack of resources, inadequate policies, practices and H&S strategy.
Internal Controls
•Competent health and safety advice readily available from the Corporate H&S team
•Corporate health and safety plan developed and monitored via Pentana
• Council has in place a robust H&S policy and Fire Risk Management Strategy that includes service specific
health and safety plans, duties and responsibilities for Chief Officers, managers and employees.
• Adequate H&S resources in place to that will allow statutory obligations in terms of the Health and Safety
at Work etc. Act and the Management of Health and Safety at Work Regulations to be fulfilled.
• Embedded H&S culture that discusses H&S issues at senior level and cascades throughout the
organisation through the health and safety committee system.
• Monthly reports to PMRG on organisational safety performance and issues.
•Chief Officers attend service H&S committees on a quarterly basis.
• Workplace inspection and audit programme.
• Service risk profiling.
• H&S training needs analysis for every employee group.
• The Council has in place a Trade Union Health and Safety Partnership Agreement. • Council promotes
health and safety training for TUs to diploma level.
Latest Note
The H&S team continue to review and streamline key service areas such risk, SMS and learning. Figtree
has seen improvements in how risk assessments are managed and the team are looking to build on this
with hazard reporting. A newsletter has also been developed to update and promote good practice. The
team continue support all H&S committees and RPO's to ensure a consistent approach. The team also have
improved the process in managing health surveillance with OH& line managers.
Risk Opportunity Demonstrate to committees, elected members, Trade Unions, employees, the community and other
external partners evidence of robust H&S culture.
Linked Actions Code & Title Progress Status Assigned To
P&T/22-23/P&C/03 Embed H&S commitments with service delivery and
workforce planning. Build and support workforce groups to promote good
practice
Stephen Gallagher
Page 287

Page 288

SR 07 Complexities in ensuring
an appropriately resourced and
resilient workforce
Failure to ensure that there is an appropriately resourced and resilient
workforce in place to meet future organisational needs, in effectively
executing the Council’s 2022-27 Strategic Plan.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
05-Oct-
2022 4 31-Mar-2027 2 Alison McBride
Potential Effect
Inability to deliver services effectively
Reduced level of service
Lack of improvement or increase in staff absences
Council underachieves as an organisation
Low staff morale
Employee conflict
Increased turnover Inability to attract/recruit
Measures of
Impact
- Access to and participation of employees in learning and
development activities
- Absence rate and trends
- Employee turnover
- Grievance, discipline and other monitoring information
- Employee voice and associated actions
- Reports from external scrutiny bodies and award bodies - Benchmarking with appropriate comparators
Risk Factors
- Inability to attract/recruit
- Lack of appropriate development
- inadequate skills
-risk to new models of service delivery
- Lack of resource/capability to deliver - Workforce unable to adapt to change
Internal Controls
- HR processes designed to meet service delivery needs
- Develop new structures to reflect strategic priorities and aligned to Future Operation Model (FOM)
- Align workforce plan to the Council's strategic planning processes (i.e. have the right people available at
the right time with the right skills to fulfil properly all of the Council's strategic priorities)
- Periodic review of pay arrangements in accordance with EHRC guidance (currently every 3 years)
- Incorporation of succession planning into workforce planning framework
- Identify training programmes to upskill staff
- Effective use of SWITCH to support alternative careers
- Flexible HR policies, in particular People First covering workforce planning, learning & development
(including elearning), digital/continuous improvement, employee wellbeing & engagement.
- Effective use of Occupational Health Service
- Robust Be the Best Conversations process
- Effective leadership and management behaviours, practice and programmes
Latest Note 
Workforce planning has developed well alongside service delivery planning. This has been supported by
better use of data in this area to inform decision making via the use of the console.
New ACAS guidance (issued July 17) Return to Work and Hybrid Working reinforces the work WDC have
undertaken to date, particularly around the workstyle exercise,  employee consultation, remote working
guidance, planned/ phased return  and variations to contracts which all see WDC well placed in supporting
the workforce. Further work to develop the approach to working flexibly has commenced.
Despite a robust package of wellbeing resources being available, absence levels are being closely
monitored, with stress and MSK absences prevalent. WDC continue to provide additional access to
counselling.
Development course for mid to senior leaders has commenced.
Trickle rollout has now been completed for the whole of the organisation and will be realaunched to ensure
this tool is better used for employee feedback and engagement.
There will be a launch of the Trade Union Learning Agreement which encourages all employees to
participate in regular learning and development.
WDC Fit for Future programme continues to support services.
Page 288

Page 289

Risk Opportunity - Identify previously unknown skills and talents in the workforce - Realise the potential of staff
Linked Actions Code & Title Progress Status Assigned To
WFP/22-23/Corp/02 Develop and implement employee life cycle plans in
line with the People First Strategy to attract and retain the workforce.
WFP/22-23/Corp/03 Implement service review process including role
design, use of new technology and new ways of working to add resilience,
address gaps, and establish opportunities for efficiencies
WFP/22-23/Corp/04 Develop and implement training plans and
development opportunities to improve capabilities and resilience within
the workforce.
WFP/22-23/Corp/01 Develop and implement wellbeing, employee
engagement, equality and training plans to enable capabilities, improved
resilience and promotion of a diverse  workforce.
SR 08 Threat of Cyber-attack
Data, systems and/or infrastructure are impacted as result of security attacks
which are increasing in number at a time when this threat is already placing
demands on resources to deliver increased levels of security controls.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
29-Sep-
2022 9 31-Mar-2027 4 James Gallacher; Iain
Kerr
Potential Effect
• Homeworking could be impacted by loss of internet services.
• Disruption to services impacting service delivery to citizens
• Staff and Citizen data loss with the potential for misuse such as identity fraud
• Misinformation being delivered to the public via WDC communication channels
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage  • Redirection of resources to deal with the effects of an attack and away from BAU
work
Measures of
Impact
• Failure to secure Cabinet Office compliance certification.
• Monitor remote access usage
• Recorded attempts from external sources to breach council cyber defences
• Recorded cyber related incidents in the Cyber incident log
• Quantity of breaches/incidents reported to the Information Commissioners Office  • Fines levied for
breaches
Risk Factors
• Potential for attacks out of normal working hours /days
• Inappropriate Cyber defences at the perimeter of the council networks
• Inappropriate delivery of security patches to desktop, network switches and server estates
• Compliance with security standards such as PSN, PCI, Public Sector Action Plan on Cyber resilience for
Scotland
• Continually changing threat landscape
• Maintaining relevant skill sets among employee group / cost of securing expert resources • Increased
targeted attacks and risks due to COVID/Hybrid working.
Internal Controls
• Robust backup strategy in place on premise and cloud backup for 365 with immutable capability.
• Service Continuity Plans
• ICT Disaster Recovery Plan
• Implementation of internal Policies on Patching and hardware/software hardening and expanded during
COVID to patch devices remotely.
• Annual PSN compliance audit including a comprehensive IT Health Check
• Governance structure in place, ICT Steering Board consisting of senior management and relevant
stakeholders meeting bi-monthly or as required in response to incidents/events 
• Programme of Internal and External ICT audits
• Information Security/Data Protection forum.  Project specific forums eg PCI working group
• Multiple layers of Cyber defences
• Network Segregation
• Rolling programme of security awareness sessions
• Interagency and cross Council working groups and sharing.
• National Digital Office / Scottish Government Public Sector Security programme and guidance
Latest Note ICT continue to follow NCSC guidance and implement additional security tools and fixes as identified.
Page 289

Page 290

Recent focus has centered on deploying software and processes for
• the potential impacts of hybrid working on the security design;
• updating both off network and on network devices; and
• remote accessing of devices went live Aug 2022.
The ICT Team also continue to work on implementation of remote management/deployment software
which is due to go live 3rd Oct 22.
Threat management, traffic & network switch DNA analysis software deployed July 22 & Sept 22. Plans to
implement additional security monitoring tool underway with ETA Nov 22.
Geo-blocking to GB remains in place and the geo-political situation continues to be monitored.
Resourcing of security roles will continue to be examined as part of normal ICT service design management
processes.
Risk Opportunity
• Increase Cyber resilience and awareness for staff, members and citizens
• Contribute to Scottish Government Public Sector Action Plan on Cyber resilience for Scotland and
potential to become involved in a national/shared security operations centre
• Upskill employees to address current and emerging threats
• Increased employee awareness across Council
Linked Actions Code & Title Progress Status Assigned To
P&T/22-23/ICT/01 Secure the Council’s Technology Infrastructure James Gallacher
P&T/22-23/ICT/02 Enhance Security and Cyber awareness programmes
tailored for hybrid working James Gallacher
SR 09 Challenges in delivering
effective services in relation to
Roads & Neighbourhoods
The risk that the Council’s fails to deliver on the three services within Roads &
Neighbourhood: Roads & Transportation, Fleet & Waste and Greenspace.
These areas provide services across a range of areas including managing and
maintain roads, footpaths and associated infrastructure, managing flood risk,
grounds maintenance, street cleaning, burial and cremation, outdoor
facilities, waste and recycling and vehicle fleet management. Failing to ensure
these services are not fully fit for purpose could result in adverse
consequences in relation to delivering efficient and effective services.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
05-Oct-
2022 4 31-Mar-2027 2 Gail Macfarlane
Potential Effect
- Assets are not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
- Service users seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions
-Council assets fail to meet relevant standards
-Failure to comply with Transport (Scotland) Act 2019 -Failure to comply with Waste (Scotland) Regulations
2012
Measures of
Impact
- Condition surveys
- Suitability surveys
- Road Condition SPI
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of asset base and facilities
-Asset user satisfaction -Operating costs and savings
-Local Government Benchmarking Framework (LGBF)
-Association for Public Service Excellence (APSE)
-Waste Managers Network Group
Page 290

Page 291

Risk Factors
-Adequacy of funding available to improve asset base
- Adequacy of staff resources allocated to the area
- Council assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts
-Over one third of the road network is in need of repair and the current long term capital funding only
sustains a steady state condition of the road network
- Increased public liability claims due to poor condition of roads network
- Increase public liability claims due to poor condition of footpaths and roads which are not part of our
adopted network.
-Poor customer engagement for recycling, deposit return scheme, refuse transfer station
-Financial challenges
- Budget Sensitivity Analysis (fuel costs, waste refuse disposal tonnage costs, bitumen availability and
costs)
Internal Controls
- Corporate Asset Management Strategy (scheduled refresh in 2nd half of 2021/22 year)
- Learning Estate Strategy
- Capital Investment Team
- Capital project meetings are carried out monthly in addition to project specific meetings.
- Capital plan
- Roads and Lighting Asset Implementation Plan
- Fleet Asset Implementation
- Open Space Asset Implementation Plan
- Sustainability Policy
-User feedback – complaints data, Citizens’ Panel and monthly telephone survey
-Fit for future service reviews
-Deposit Return Scheme
-Climate Change Strategy
-Community Empowerment Strategy
-Food Growing Strategy and Allotments
-Equality Outcomes
Latest Note Service continues to provide full service, monitoring in place to ensure any adverse issues are highlighted
and appropriate actions taken
Risk Opportunity
-Enhance reputation of Council
-Estate, assets and service delivery (e.g. office and depot rationalisation projects, roads upgrade
programme, vehicle replacement programme, greenspace upgrade projects)
- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- The continued implementation of the energy efficient street lighting project will both improve the asset
and reduce costs significantly through reduced maintenance, energy
consumption and carbon output.
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
Linked Actions Code & Title Progress Status Assigned To
R&N/22-23/F&W/02 Continue to work collaboratively with Argyll & Bute
and Inverclyde Councils to develop a best value proposal for procuring
the reception, transportation, treatment and compliant disposal of
biodegradable municipal waste
Kenny Lang; Jenna
Mccrum
R&N/22-23/F&W/04 Produce a business case for the development of a
waste transfer station within Council’s boundary
Kenny Lang; Jenna
Mccrum
R&N/22-23/R&T/12 Develop an action plan for depot rationalization Liam Greene
R&N/22-23/R&T/13 Review winter gritting programme and implement a
more effective service provision Liam Greene
Page 291

Page 292

SR 10 Failure to maintain
Housing Stock
The risk that Council’s Housing Stock are not fully fit for purpose with
consequent adverse impact on our ability to deliver efficient and effective
housing for Council tenants.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
05-Oct-
2022 4 31-Mar-2027 4 Alan Young
Potential Effect
- Housing stock is not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
-Increase in reactive maintenance costs/ demand/ volume
-Housing stock in poor condition
-Housing stock fail to meet relevant standards
- Non-compliance with Scottish Housing Quality Standard
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of housing stock
-User satisfaction
-Operating costs and savings
- Local Government Benchmarking Framework (LGBF)
Risk Factors
- Adequacy of funding available to improve housing stock
- Adequacy of staff resources allocated to the management of housing stock
- Housing stock deemed to be unfit for existing purpose
-Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw
material costs, impacted on supply chains, and third parties and our ability to carry out works within
budget and on time.
Internal Controls
- Housing Capital Investment Programme (refreshed and delivered annually)
- Housing Capital Improvements
- WDC Local Housing Strategy 2021-25
- The Housing Capital Investment Team
- The Planned Maintenance Section
- Housing Asset Management Strategy
- Detailed asset database that shows relevant information on a property by property basis in relation to
HRA properties.
- More Homes Better Home Project Board.
- Telephone Survey feedback
- Fit for future reviews
-Other benchmarking/ feedback
- Climate Change Strategy
Latest Note Full programme of of maintenance and upgrade in place, with regular monitoring and reporting
Risk Opportunity
-Enhance reputation of Council by being able to improve Council housing stock
-Estate, assets and service delivery (housing investment programme )
-Improved satisfaction from tenants
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
-Improvement of SHQS & EESSH compliance performance and points, and reduced SHQS abeyance
numbers through the strategic planning and management of housing assets.
- Increase in environmental improvements including bin stores
- Increase in internal (e.g kitchens, bathrooms, showers, special needs adaptations, central heating, smoke
detectors, windows and doors) and external updates (e.g new roof coverings, external insulated render and
tenement structural refurbishments)
- Increase in number of New Build Homes as part of the Strategic Housing Investment Programme (SHIP)
-Achieve energy efficiency standard for social housing
Linked Actions Code & Title Progress Status Assigned To
SD&P/22-23/HAI/10 Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality Standard and reduce the
number of properties held in abeyance.
Alan Young
SD&P/22-23/HAI/11 Deliver the HRA Capital Investment programme for
2022/23 Alan Young
Page 292

Page 293

SD&P/22-23/HAI/12 Ensure the Council’s Housing stock progresses
towards the achievement of the energy efficiency standard for social
housing.
Alan Young
SR 11 Inability to reduce
carbon footprint in line with
targets
The risk that the Council will be unable to achieve net zero emissions by
2045, both in relation to mitigating carbon emissions and adapting to the
impacts of climate change. Net zero refers to achieving an overall balance
between emissions produced and emissions taken out of the atmosphere. This
target has been developed in a way that mirrors the emission reduction
trajectory set by the Scottish Government in light of the Climate Emergency.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
05-Oct-
2022 4 31-Mar-2027 2 Adam Armour -
Florence
Potential Effect
. Failure to meet mandatory national and international policy drivers Failure to meet duties placed on
Council by The Climate Change (Scotland) Act 2009
. Failure to meet duties placed on Council by The Climate Change (Emissions Reduction Targets) (Scotland)
Act 2019
. Failure to meet duties placed on the Council by The Heat Networks (Scotland) Act 2021 and Local Heat
and Energy Efficiency Strategies (Scotland) Order 2022.
. Failure to meet the provisions set out in Waste (Scotland) Regulations 2012 which help Scotland move
toward the objectives and targets set out in the Scotland’s Zero Waste Plan to help transition toward a
circular economy.
. Reputational damage.
. Financial burden of responding to adverse events such as extreme weather (including, but not limited to,
flooding, heat waves, wind driven storm events, etc.) resulting in action. Impacts to Council operations and
supply chains as a result of adverse climate/extreme weather events. This also impacts residents, local
businesses and wider infrastructure across West Dunbartonshire.
Measures of
Impact
. Improving organisational resilience against the impacts of climate change.
. Improving local biodiversity through planting of native trees and bulbs in WDC
. WDC Waste Services Citizens Panel Survey regarding attitudes towards recycling improving
. The extension of the Queens Quay District Heating Network to NHS Golden Jubilee Hospital, Social
Housing, NHS Health Centre, Council buildings and further connections as per scope.
. Inspiring change through including climate change in staff induction, training, team meetings, etc.
. Uptake in e-learning modules on climate change.
. Uptake in staff carrying out Sustainable Procurement assessments for tenders.
. Ensuring climate change and sustainability metrics are included in tenders for suppliers/contractors/etc.
(such as carbon reduction measures) so they are being measured for accountability for the impacts they
have on the environment
. Management setting climate change targets.
. The uptake of Green Champion roles, which help normalise Climate Change and Sustainability, practices
across the Council. Uptake in sustainable travel such as walking cycling and public transport
Risk Factors
. Funding availability – delivery of actions to mitigate will require resources, capital works and investment
by the Council- e.g enhanced energy measures, and heating and renewables projects in both domestic and
non-domestic building assets
. Funding approach – a combination of internal and external funding sources will be need to delivery
climate action at scale. Short term funding mechanisms such as annual payback of Council expenditure
presents difficulties for delivering long term projects. Climate Change investments also need to take
account of whole-life costs including reduced maintenance costs and avoided Adaptation costs.
. Internal capacity – limited staff time and availability, largely due to reduced Council budgets, further
impacted by Covid19.
. Communication – both internally (to avoid ‘silo’ working) and externally (engaging with the public and
keeping abreast of local/national/international changes to policy).
. Economics – some technologies, materials and skills are still very expensive so innovation must progress
to enhance the viability of climate actions within the context of the Council’s budget constraints.
. Strategy and planning – all existing and future Council plans should place responding to the climate
emergency at their core and ensure integration with other Council services.
. Legislation & Regulatory – the ability to implement some climate actions is constrained at the local level
by minimum standards and other restrictions set through legislation and national policy, for example in
relation to building regulations, planning and procurement.
. Public attitudes and behaviours - Changing behaviour of residents, businesses and stakeholders positively
and proactively, especially where there are cost implications to the delivery of climate actions.
Page 293

Page 294

Internal Controls
. Climate Change Strategy and Action Plan 2021-2026
. Climate Change Action Group (CCAG)
. Pentana Risk Management System – devolved responsibilities of climate change actions/milestones/KPI’s
to service areas.
. Scottish Government – Mandatory annual Climate Change Duties Reporting
. Queens Quay District Heating Network
. Strategic Environment Assessment (SEA)
. Air quality monitoring
. Converting some Council pool fleet to Electric Vehicles (EVs).
. Climate Ready Clyde (CRC) – a cross-sector initiative funded by fifteen member organisations and
supported by the SG. Delivery of a Locale Heat & Energy Efficiency Strategy (LHEES) and delivery plan by
December 2023 – which sets out the Council’s area-based approach to reducing emissions of heating and
energy efficiency improvements to ALL assets across WD. This includes private housing, businesses, etc.
which are not owned/operated by WDC.
Latest Note
The Council’s carbon footprint for 2021-22 is 24,022 tonnes of CO2e (against a target of 22,803).  This
means that we have increased our carbon emissions by 1.2% against the previous financial year. The
reasons for the Council not reducing carbon emissions by 3.5% against the previous financial year are
noted below.
Challenges
New Carbon Reduction Targets - Stricter carbon reduction targets set by the Climate Change Strategy
mean that annual reductions will be more challenging to achieve net zero by 2045.  However, it should be
expected that there will be peaks and troughs (fluctuations) on our carbon reduction journey towards
2045.
COVID 19 Pandemic - The pandemic had an unprecedented impact on our Council operations and
residents.  More staff work remotely and as a result we have had to add carbon emissions from
homeworking to the Council’s overall carbon footprint.  Emissions relating to energy, waste and travel have
also increased because, like the whole world, West Dunbartonshire is ‘bouncing back’ from the pandemic.
Waste Streams – Waste and Recycling make up almost 52% of the Council’s carbon footprint.  Waste
levels, particularly from residents, have been increasing since 2012-13, with the highest recorded
emissions occurring in 2021-22.  Since waste is the largest proportion of Council emissions, improvements
to emissions from other sources do not have as much of an impact on our carbon footprint. Heating –
Heating makes up about 20% of the Council’s carbon footprint.  Whilst carbon emissions for heating have
decreased slightly, the benefits of our energy efficiency interventions have been impacted by ventilation
requirements in schools as a result of the pandemic.  Heating will work harder and go on for longer as a
result of windows and doors having to be open across all of our schools.
Risk Opportunity
.Our local environment is protected, enhanced and valued resulting in:
- Our public spaces are attractive and welcoming
- Our residents feels pride in their local neighbourhood
- The percentage of household waste sent for reuse, recycling and composting has increased resulting in
reduction in the percentage that was being landfilled.
- The percentage of council land which promotes diversity of habitat and species has increased
.Our resources are used in an environmentally sustainable way
- Increase in the percentage of businesses taking action to reduce their carbon impact
- Reduction in CO2 emissions under the Council’s influence
- Reduction in West Dunbartonshire Area-Wide emissions as per requirements of the climate change
(Scotland) act
- Residents actively involved in tackling climate change and protecting the environment
- The economy and infrastructure become more low carbon and environmentally-friendly
. Our neighbourhoods are sustainable and attractive
- Increased investment in our housing stock including improving energy efficiency
- Housing developments are meeting the needs of our changing population
- The quality of neighbourhoods has improved
- Our roads and transport network are maintained and they promote safe travel routes
Linked Actions Code & Title Progress Status Assigned To
REG&R/22-23/011 Co-ordinate, monitor and report the progress of the
Council’s Climate Change Action Plan for 2022/23
Adam Armour -
Florence
Risk Status
Alert
Page 294

Page 295

High Risk
Warning
OK
Unknown
Page 295

Page 296

Page 296

Page 297

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Corporate Services Committee : 2 November 2022
___________________________________________________________________
Subject: The Public Interest Disclosure Policy amendments and additions
1.0 Purpose
1.1 To provide an update to Committee on amendments made to The Public
Interest Disclosure Policy.  
2.0 Recommendations
2.1 The Committee is asked to:
(1) Note the contents of the report, and
(2) Agree the revisions to the policy.
3.0 Background
3.1 A review of the current policy was undertaken as a result of recommendations
made following an investigation carried out by Internal Audit into a Public
Interest Disclosure concern. The policy was reviewed to ensure it remains fit
for purpose, provides a clear and legally compliant framework and facilitates
the reporting of an employee’s concern about a danger, illegality or
malpractice that has a public interest aspect to it; usually because it threatens
others such as the local community, service users or other employees. 
3.2 The relevant legislation that was considered in reviewing the policy is The
Employment Rights Act 1996, Part IVA (Protected Disclosures) and section
103A; the Public Interest Disclosure Act 1998; the Enterprise and Regulatory
Reform Act 2013, sections 17 and 18; GDPR Regulations and the Data
Protection Act 2018.
4.0 Main Issues
4.1 The changes are set out in summary below:
4.1.1 Section 8.2 of the Procedure has been changed as new protocols have been
introduced to further ensure the confidentiality of Public Interest Disclosure
emails and attachments sent to Chief Officers/Chief Executive. Emails sent
directly from the Public Interest Disclosure Inbox will be marked as Private to
ensure they are visible to the recipient only and not accessible to Leadership
Support Personal Assistants. A further failsafe has been introduced, namely
ITEM 19
Page 297

Page 298

that Leadership Support Personal Assistants are instructed to not open Public
Interest Disclosure emails.
4.1.2 Some minor changes have also been made to update job titles and contact
details.
4.2 Once approved, the new protocols will be communicated to all Chief Officers,
the Chief Executive and Leadership Support team members in the usual
manner. The changes will also be communicated to the workforce through the
intranet, Trickle and information cascades through managers. The Trade
Unions have already been made aware of the changes.
5.0 People Implications
5.1 The revised policy ensures that the framework to report and investigate
disclosures made in the public interest is clear, robust and compliant with
legislative changes.  A transparent process will support a culture where
employees feel able to make a public interest disclosure without fear of
sanction and in line with legislation, their confidentiality will be maintained.
The revised policy will be communicated to employees via the usual
mechanisms and will be available on the Intranet. 
6.0 Financial and Procurement Implications
6.1 There are no financial or procurement implications associated with this report.
An opportunity to address any malpractice or wrongdoing at an early stage
could mitigate the extent of financial losses to the Council.
7.0 Risk Analysis
7.1 A robust internal procedure is required to minimise the risk of external
disclosures and damage to the Council’s reputation and to ensure risks are
identified early and addressed to minimise any service disruption or financial
costs. 
8.0 Equalities Impact Assessment (EIA)
8.1 An Equality Impact Assessment has been carried out and is provided as an
attachment to this report. The policy promotes equality of opportunity across
all equality strands and protected characteristics and encourages employees
to report any potential unlawful practice which would include any breach of the
Equality Act 2010.
9.0 Consultation
9.1 A number of key stakeholders were consulted during the development of the
new policy.  This included HR, Internal Audit; Legal; and the Trades Unions. 
9.2 The revised draft of The Public Interest Disclosure Policy was submitted to the
Trades Unions by email on 13th September 2022 for comment by 30th
Page 298

Page 299

September 2022. As at 6th October agreement had been confirmed by all
Teaching and SJC Unions.
10.0 Strategic Assessment
10.1 The Public Interest Disclosure Policy contributes to Council’s strategic
priorities by ensuring that early warnings of malpractice may mitigate the
extent of financial losses to the Council, contributes to better asset
management by utilising employees to manage risks to the organisation’s
reputation and supports fit for purpose services through the continuation and
promotion of robust employment practice.  
Victoria Rogers
Chief Officer – People and Technology
Date: 7 October 2022
Person to Contact:  Tara Spooner HR Advisor, Church Street, Dumbarton
Tel:  01389 737402
Email: Tara.Spooner@west-dunbarton.gov.uk
Appendices: Appendix 1 –Public Interest Disclosure Policy
Background Papers: EIA
Wards Affected: None
End of Document
Page 299

Page 300

Page 300

Page 301

HR Employment Policy & Procedures
Public Interest Disclosure Policy
Review Date: July 2022
Appendix 1
Page 301

Page 302

Document Management - Version Control
Policy Title &
Reference
Public Interest
Disclosure Policy HRP/00
Version Number &
Date 3.0 July 2022
Title, Version
Number & Date of
Superseded
Version (if
applicable) 
Public Interest
Disclosure Policy  2.0
Rationale for
introduction/Driver
for change
Updated to incorporate recommendations made
by Internal Audit following an investigation
Summary of
Substantive
Changes (if
applicable)
Section 8.2 of the Procedure has been changed
as new protocols have been introduced to further
ensure the confidentiality of Public Interest
Disclosure emails and attachments sent to Chief
Officers/Chief Executive. 
Emails sent will be marked as Private to ensure
they are visible to the recipient only and not
accessible to Leadership Support Personal
Assistants. 
A further failsafe has been introduced, namely
that Leadership Support Personal Assistants are
instructed to not open Public Interest Disclosure
emails.
Summary of
Technical Changes
(if applicable)
Lead Officer Tara Spooner, HR Adviser
Final Trades Union
Position The policy was agreed on
Consultation &
Approval Process
Committee/Forum Date
Trades Union
Convenors  13/9/22
Page 302

Page 303

JCF (if applicable)
C. S. Committee (if
applicable) 2 November 2022
Accompanying
Documentation
(incl. EIA)
Online forms:
Record of Concern:
https://intranet.west-dunbarton.gov.uk/people-
technology/hr-online/core-employment-
policies/making-a-disclosure-in-the-public-
interest/
Linked Policy,
Schemes and
Procedures
Code of Conduct https://intranet.west-
dunbarton.gov.uk/media/15259/code-of-conduct-
version-44.pdf
Grievance Policy and Procedure
https://intranet.west-
dunbarton.gov.uk/media/15403/grievance-policy-
44-february-2020.pdf
Page 303

Page 304

Contents
Section Title Page Number
Public Interest Disclosure Policy 5 – 8
1 Introduction 5
2 Scope 5
3 Error! Reference source not found. 5
4 Error! Reference source not found. 6
5 Legislative Context 6
6 Application of Policy 6
7 Roles and Responsibilities 7
8 Review and Monitoring 8
Public Interest Disclosure Procedure   9 - 13
1 Introduction  9
2 Protection 9
3 Reporting a Concern 9
4 Handling Concerns 11
5 Outcome of Investigation  12
6
7
8
9
10
Feedback
Deliberately False or Malicious Allegations
Confidentiality
Anonymous Allegations
Record Keeping
12
12
13
13
13
Appendices  14 - 16
1 Record of Concern 14
2 Internal Audit Contact Details 16
Page 304

Page 305

1. Introduction
1.1 The Council is committed to the highest possible standards of delivery of
services and for full accountability for those services. In line with this
commitment, employees are encouraged to come forward and raise any
serious concerns they may have about malpractice or wrongdoing within
the Council, as early as possible, to enable us to deal with risks
appropriately.
1.2 This policy has been developed to promote, encourage and support
employees to make disclosures in the public interest.  The supporting
procedures outline how to raise concerns, how we will handle concerns
and the protection rights for employees.  Protection is guaranteed for an
employee who raises a reasonable and honest suspicion about a possible
fraud, danger or other serious risk that threatens customers, colleagues,
the public or the Council’s own reputation.
2. Scope
2.1 This policy applies to all employees of West Dunbartonshire Council
including, Local Government Employees, Quasi-Craft Workers, Teaching
Staff and Chief Officers.
2.2 Concerns relating to a dispute about the employee’s own employment
position, with no additional public interest dimension, are out-with the
scope of this policy and fall under the remit of the relevant Grievance or
Discipline policies.
3.0 Definitions
3.1 A disclosure in the public interest is where an employee has a concern
about a danger, illegality or malpractice that has a public interest aspect to
it; usually because it threatens others such as the local community,
service users or other employees. 
3.2 A qualifying disclosure is a concern about one or more of the following:
• Criminal offences (such as fraud or corruption);
• A failure to comply with a legal obligation including statutory code of
practice;
• A miscarriage of justice;
• Threats to an individual’s health and safety;
• Damage to the environment; and/or
• A deliberate attempt to cover up any of the above.
Page 305

Page 306

3.3 Where a concern is raised through this policy but is not deemed a
disclosure in the public interest, employees will be referred to the most
relevant policy to raise their concern.
4. Key Principles
4.1 This Policy aims to:-
• Create a culture of openness to encourage employees to raise
concerns as early as possible to enable appropriate action to be taken.
• Provide a clear framework for raising concerns and feedback on any
action taken.
• Reassure employees that they will be protected from possible reprisals
or victimisation when a disclosure is made under the Policy.
5. Legislative Context
5.1 The legislative context of the policy is Part IVA (Protected Disclosures)
and section 103A of the Employment Rights Act 1996, as amended by the
Public Interest Disclosure Act 1998 and the Enterprise and Regulatory
Reform Act 2013 (“the legislation”).  The legislation seeks to protect
individuals who make certain disclosures of information in the public
interest. Such qualifying disclosures that are in the public interest and
meet the legal test will be protected in law. The Act also provides a right
for individuals to bring action in respect of victimisation related to such
qualifying disclosures.
5.2 All data recorded under this policy will be held in compliance with GDPR
Regulations and the Data Protection Act 2018.
6. Application of Policy and Procedures
6.1 To support the application of this policy, separate procedures have been
developed. The procedure outlines four routes for employees to make
disclosures in the public interest. The four routes are listed below and
detail on how to report a concern are outlined in Section 3 of the
Procedures:
Route 1 - Disclosure made to Line Manager 
Route 2 - Disclosure made to Line Manager’s Manager or other
appropriate Senior Manager
Route 3 - Disclosure made to Internal Audit
Route 4 - Disclosure made to External Regulating Body
Page 306

Page 307

7. Roles and Responsibilities
7.1  Council
• Creating a culture of openness to encourage employees to raise
concerns as early as possible.
• Ensuring that appropriate mechanisms are in place for employees to
report wrongdoing or malpractice and for such reports to be
investigated accordingly.
• Protecting employees making a disclosure in the public interest in line
with the legislation.
• Ensuring Internal Audit is advised of the Disclosure in the Public
Interest.
7.2 Management
• Maintaining knowledge of the ‘Public Interest Disclosure Policy’.
• Carrying out a prompt investigation of any disclosures made in the
public interest.
• Supporting employees making a disclosure in the public interest in line
with the legislation.
7.3 Employees
• Maintaining knowledge of the ‘Public Interest Disclosure Policy’.
• Raising qualifying disclosures as soon as possible in line with
procedure to enable management to carry out any required
investigation.
• Participating in any resulting investigation.
Internal Audit
• Carrying out prompt investigation of any disclosures made in the public
interest.
• Supporting employees making a disclosure in the public interest in line
with the legislation.
7.4 Human Resources
• Providing guidance, advice and support where necessary.
• Carrying out the review of the Policy and Procedure.
7.5 Trades Unions
• Providing guidance and support to employees.
• Accompanying employees to investigatory interviews as required.
Page 307

Page 308

8. Reviewing and Monitoring
8.1 The policy will be reviewed in accordance with new or amended legislation
as required. Responsibility for policy review, informing, negotiating and/or
consulting with Trade Unions and reporting to the appropriate Committee
rests with the Chief Officer, People and Technology.
8.2 All concerns raised under the policy will be reported to Internal Audit who
will maintain a central record and report complaints in summary form to
the Audit Committee.
Page 308

Page 309

Procedures
1. Introduction
1.1 These procedures have been developed to support the Public Interest
Disclosure Policy and outline how an employee can raise a concern, the
steps that will be taken when a concern has been raised, providing
feedback, confidential reporting and record-keeping.
2. Protection
2.1 Employees making a disclosure in the public interest will be protected
against being subjected to any detriment such as dismissal, harassment,
victimisation or any other form of punitive sanction when a protected
disclosure is made.
2.2 For an employee’s disclosure to be protected by law they must:
• Disclose information and not simply make unsupported allegations
• Reasonably believe the information is in the public interest and
substantially true
• Reasonably believe it shows one of the categories of qualifying
disclosure, as referred to at 3.2 of the Policy.
2.3 If an employee is victimised or treated unfavourably due to making a
disclosure in the public interest, this will be a disciplinary matter and will
be referred to the appropriate disciplinary policy.  
3. Reporting a Concern
3.1 Employees should report any concerns as soon as possible using the
appropriate reporting route.  An employee is not expected to carry out any
personal investigations to gather evidence, however they must disclose
facts/information (as referred to at 2.2 and 3.4 of this Procedure) to allow
the matter to be properly considered.
3.2 Any contact with the press must be made through the Chief Officers
People and Technology and Citizen, Culture and Facilities (CCF) and take
account of the Council’s Code of Conduct. Any disclosures to the press or
any other person not authorised by the Council, or protected by the Public
Interest Disclosure Act, are prohibited and may result in disciplinary
action.
REPORTING ROUTES
Route 1 – Line Manager
Page 309

Page 310

3.3 Employees should initially raise any concerns with their direct line
manager.  Concerns can be raised verbally or in writing. 
3.4 An employee should provide as much information about the matter
including: nature of concern; any relevant background information; the
person/people involved, where they work, dates and times; names and
jobs of other people who may or may not support the concern.
3.5 The Manager hearing the concern will take a record of the details. A
template for recording concerns is available at appendix A. 
Route 2 – Line Manager’s Manager or other appropriate Senior
Manager
3.6 When an employee does not feel confident about raising a concern with
their line Manager, or they suspect the concern implicates the line
Manager in some way, the concern can be raised at a more senior level.
3.7 The Manager dealing with the concern will take a record of the details for
recording purposes. A template for recording concerns is available at
appendix A.
Route 3 – Internal Audit
3.8 The Council understands that employees may wish to raise a concern
outside of line management or receive independent advice on concerns
they may have before reporting this to their Manager. Employees can
raise a concern through Internal Audit or by contacting the following
number for confidential advice - 01389 737272
3.9 Concerns can be raised verbally or in writing to Internal Audit. Contact
details for Internal Audit can be found in Appendix B and on the Intranet.
3.10 Employees are not required to complete any paperwork however; Internal
Audit will take a record of the details for recording purposes.
Route 4 – External
3.11 When an employee makes an internal disclosure in the public interest the
relevant external bodies will be notified of any risks identified by the
Council. While it is hoped that the Public Interest Disclosure Policy will
encourage employees to raise concerns internally, the Council accepts
that there may be occasions when an employee may decide that it is not
appropriate to raise concerns internally. In this case the employee may
contact the appropriate external body (e.g. Police, HSE, registered
statutory body) in line with the Code of Conduct.    
4.0 Handling Concerns 
Page 310

Page 311

4.1 When a concern has been raised an assessment will be made of the
action to be taken.  This may involve an internal query or a more formal
investigation. 
4.2 Before an investigation is carried out the line Manager or Internal Audit will
consider whether the concerns should be treated as a disclosure in the
public interest e.g. something a regulator would consider to be of public
interest. This will include considering the following factors:
• An employee making a disclosure in the public interest is best viewed
as a witness who is putting the organisation on notice of the risk rather
than as a complainant seeking to dictate to the organisation how it
responds.
• A disclosure in the public interest is an aspect of good citizenship in
that the employee is speaking up for, and on behalf of, others to draw
this malpractice or wrongdoing to the attention of the Council.
4.3 If the concerns do not meet these factors, the employee will be directed to
the most relevant policy to take their concerns forward. 
4.4 Management or Internal Audit will consider the information in the context
of what they know about the particular area or activity and the information
the employee provides. From that, and on the assumption that the
information is well-founded, the Manager or Internal Audit should assess:
• how serious and urgent the risk is;
• whether the concern can best be dealt with under the Public
Interest Disclosure policy or some other procedure; and whether
the assistance of, or referral to, a Chief Officer or a specialist
function will be desirable or necessary.
4.5 If the information can simply be followed up during a routine audit, or if it
could just as easily have come from a customer complaint, then there will
often be practical advantages for all concerned if the organisation
addresses the matter on that basis and does not build its response around
the employee’s evidence. If this appears a realistic way forward, the
employee that reported the concern should be informed, where they have
provided their details. 
4.6 If appropriate, the Manager or Internal Audit will conduct an investigation
into the concerns and produce a report detailing their findings to be
passed to the appropriate departmental Senior Officer. Investigations will
be carried out following the Council’s standard guidelines on conducting
an investigation. 
Page 311

Page 312

4.7 Where Internal Audit finds cause for further action following an initial
investigation, this will be passed to the relevant Chief Officer to nominate
an appropriate Manager to take forward. 
4.8 Where specific inquiries need to be made in the area where the employee
raising the concern works, the employee should be prepared to answer
questions as part of the process. 
5.0 Outcome of an Investigation 
5.1 Following the investigation, if a disciplinary offence has been identified the
complaint will then be dealt with under the relevant disciplinary policy. 
5.2 If a serious issue has been identified, the Manager or Internal Audit will
consider informing any external bodies (e.g. a regulator, a supervisory
agency or the police) either to enlist their assistance or to reassure them
that the matter is being addressed properly.
5.3 Following the investigation, if it is identified that there is no case to
answer, no further action will be taken.
6. Feedback
6.1 When requested, the Council will provide relevant feedback to the
employee who raised the concern. While the Council will provide as much
feedback as it properly can, due to the legal obligations of confidentiality,
feedback will not include the outcome of any disciplinary action taken
against another employee or any information that may lead to a wider
public disclosure.
6.2 Where feedback is limited, employees should be assured that, this does
not reflect on the seriousness of the original concern.
6.3 In the event that no conclusion can be drawn from the concerns raised,
and the employee did not act maliciously, the employee will be advised of
the outcome of the investigation with any discrepancies between the initial
report and the findings being highlighted.
7.0 Deliberately False or Malicious Allegations
7.1 An employee will not be penalised or subjected to any detriment for
making a public interest disclosure.  However, where a concern is not a
public interest disclosure and it is considered that it was raised frivolously,
maliciously, was vexatious or for personal gain, this will be a disciplinary
matter.
8.0 Confidentiality
Page 312

Page 313

8.1 Concerns raised will be treated in strict confidence and, when requested,
an individual’s identity will normally be kept confidential.  This ensures
protection from reprisal in line with the provisions of the Public Interest
Disclosure Act 1998. However in some circumstances it may not be
possible to preserve the anonymity of the employee making the initial
report. For example, if the matter is serious enough to be investigated in
detail by Internal Audit or reported by the Council to an external agency
such as the Health and Safety Executive or the Police. 
8.2 In all cases, concerns directed to Chief Officers will be marked as Private
and the subject header will read Strictly Confidential. Emails marked as
such are set up so that only the recipient is able to access them. In the
event that a Chief Officer’s Leadership Support Personal Assistant (PA)
comes across a Public Interest Disclosure email, they are instructed to not
open the email or any attachments. These established protocols in respect
of highly sensitive emails and attachments addressed to Chief Officers,
and the responsibilities of their Leadership Support Officers in relation to
these, will apply.
9.0 Anonymous Allegations
9.1 To assist in the effective investigation of any disclosures made under this
policy the Council strongly encourages employees to reveal their identity.
9.2 If an employee chooses to make an anonymous disclosure, the Council
will not be able to provide any feedback to the individual and the Manager
or Internal Audit will have to consider the seriousness of the issue, the
credibility of the concern and the likelihood of being able to confirm the
allegation, in other ways.
10.0 Record Keeping
10.1 A central record of all complaints raised under this policy will be
maintained.  This will include complaints reported via the confidential
helpline or via a Manager.  The record will show details of the complaint,
action taken and outcome.
10.2 Where, following an investigation, no further action is required all
documentation will be destroyed.
10.3 Following the investigation, if a disciplinary offence has been identified the
complaint will then be dealt with under the relevant disciplinary policy and
records held in compliance with that policy.
Page 313

Page 314

Private and Confidential
Disclosure in the Public Interest
Record of Concern
Employee Name
Employee Reference Number
Job Title
Department
Phone Number
Details of concerns Raised
Date concern raised
Confidentiality Requested Yes No
Response Supporting Evidence
Investigation Approved 
Employee directed to
relevant policy to raise
concern
No further Action required
Line Manager’s Signature Date
Employee’s Signature Date
Appendix 1
Page 314

Page 315

Appendix 2
Internal Audit Contact Details
E-mail publicinterestdisclosure@west-
dunbarton.gov.uk
Post  Public Interest Disclosure
West Dunbartonshire Council
16 Church Street
Dumbarton
Intranet/Internet An online form is available on the
Intranet and Internet.
Public Interest Disclosure hotline 01389 737272
End of Document