Democracy Spraffa

Item 14 - Appendix 1 and 2

West Dunbartonshire Council · 17 August 2022
Back to Corporate Services Committee — 17 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Appendix 1: Resources Delivery Plan 2021/22 - Year-end Progress
Supported individuals, families and carers living independently and with dignity
More affordable and suitable housing options
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Time (days) for processing
applications for new Housing Benefits
claims from the date of receipt of the
application to the day on which the
claim is decided
18 24 24
Target met despite the increase in caseload
and changes in reported circumstances which
impacts the volume of work received by the
section.
Ryan Chalmers
Time (days) for processing
applications for notifications of
changes of circumstances for
Housing Benefits from the date of
receipt of the application to the day
on which the claim is decided
3 2.9 5
Target met and performance has improved
despite the increase number of changes
actioned by the section.
Ryan Chalmers
Meaningful engagement with active, empowered and informed citizens who feel safe and engaged
Strong and active communities
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
% of council resources directed by
communities 1.07% Not yet
available 1%
This will be available at the end of August
2022 when the data is submitted to Scottish
Government.
Clare English;
Gillian McNeilly;
Elaine Troup
Open, accountable and accessible local government
Strong financial governance and sustainable budget management (Service Objective)
Appendix 1

Page 2

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Amount of free reserves as a
percentage of the prudential reserve
target - HRA
100% 100% 100%
Target met. Value is draft until audit of
financial statements is complete towards the
end of the calendar year.
Gillian McNeilly
Amount of free reserves as a
percentage of the prudential reserve
target - General services
111% 112% 100%
Target met. Value is draft until audit of
financial statements is complete towards the
end of the calendar year.
Gillian McNeilly
Value of outstanding sundry debt as
a percentage of total that is more
than 90 days old from date of invoice
61.8% 76.5% 64%
Target not met. This is due to increased
collection of newer debts, reduction in total
debts outstanding and many older debts are
on arrangements which take longer to fully
recover.  The overall debt outstanding has
reduced from approximately £13.1m to
£7.6m, and collection of new debts has
improved resulting in significantly lower
debts outstanding less than 90 days old.
Early collection of new debts impacts on this
PI along with older debts on long term
arrangements for repayment.
Ryan Chalmers
Rent collected as a % of total rent
due 98.88% 98.39% 98%
Target met despite the continued impact of
COVID-19 on tenants. Significant support
was provided from sections to assist many
tenants moving to long term arrangements.
Ryan Chalmers
Percentage variance to budget
projected (General Services budget) -0.26% -0.06% 0%
Target met with actual spend slightly below
budget. Value is draft until audit of financial
statements is complete towards the end of
the calendar year.
Gillian McNeilly
Percentage of Audit Plan completed 70% 75% 85%
Target missed. Fieldwork was completed for
12 of 16 reviews. Completion of 2021/22 was
impacted by resourcing issues during the
year and completion of carry forward from
the 2020/21 audit plan which were
completed in 2021/22. The final 4 reviews
for 2021/22 will be carried forward to
2022/23 audit plan and targeted to be
completed by September 2022.
Andi Priestman
Percentage of corporate fraud
savings target achieved 183% 114% 100%
The team achieved corporate fraud savings
of £284,883 against an annual target of
£250,000.
Andi Priestman

Page 3

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Support services as a % of total
gross expenditure 3.76% 3.42% 3.87%
Target met. Value is draft until audit of
financial statements is complete towards the
end of the calendar year.
Adrian Gray
Cost of collecting council tax per
dwelling £ £6.84 £5.85 £5.00
Cost of collection has improved from
2020/21 however costs are still impacted by
COVID-19 recovery process and additional
support/assistance provided to tax payers
during and following the pandemic.
Ryan Chalmers
Total useable reserves as a % of
council annual budgeted revenue 6.5% 6.45% N/A as data
only PI
The calculation of the PI does not take
account of the extent that useable reserves
are earmarked for specific purposes.
Gillian McNeilly
Uncommitted General Fund Balance
as a % of council annual budgeted
net revenue
2.19% 1.38% 1.28%
Value is draft until audit of financial
statements is complete towards the end of
the calendar year.
Gillian McNeilly
Ratio of Financing Costs to Net
Revenue Stream - General Fund 4.07 3.28 N/A as data
only PI
Value is draft until audit of financial
statements is complete towards the end of
the calendar year.
Gillian McNeilly
Ratio of Financing Costs to Net
Revenue Stream - Housing Revenue
Account
23.59 23.55 N/A as data
only PI
Value is draft until audit of financial
statements is complete towards the end of
the calendar year.
Gillian McNeilly
Actual outturn as a percentage of
budgeted expenditure 99.74% 99.94% 100%
Target met. Value is draft until audit of
financial statements is complete towards the
end of the calendar year.
Gillian McNeilly
Current tenants' arrears as a
percentage of total rent due % 11.9% 11.16% 13% Targets met; a good achievement given the
continued impact COVID-19 had on our
tenants and also the increased cost of living.
The cost of living is expected to increase
significantly in 2022/23 and processes are in
place to support tenants and provide
assistance. However, this is likely to impact
on performance.
Ryan Chalmers
Gross rent arrears (all tenants) as at
31 March each year as a percentage
of rent due for the reporting year
10.35% 9.24% 10.35% Ryan Chalmers
Action Status Progress Due Date Note Owner
Review ways of decreasing corporate debt
through continued improvements to debt
collection processes in relation to sundry,
NDR, Council Tax and rent
31-Mar-2022
Recovery of debts has been impacted by COVID-19. However, a review of
all processes within Corporate Debt was carried out to streamline to
maximise recovery and reduce costs of contact. Ryan Chalmers

Page 4

Action Status Progress Due Date Note Owner
We have reviewed process for recovery of Council Tax debt with our debt
partners, improving the interface between systems to allow earlier
contact.
System improvements have been implemented with our Corporate Arrears
Recovery System to allow bulk requests for DWP for debt recoveries which
has resulted in increased recoveries.
Continue to review ways to improve rent
collection rates in conjunction with Housing
and W4U
31-Mar-2022
Following a review of the process, the role of managing arrears within
Housing changed from generic to specialised which has seen an
improvement in terms of case management and escalation of cases. This
change has been extended to September 2022 and the process will be
reviewed at the end of the first quarter in 2022.
Ryan Chalmers
Ensure continued compliance with the Code of
Good Governance 31-Mar-2022 Completed as part of the annual review of Annual Governance Statement
2021 and reported to Audit Committee 16 June 2021. Andi Priestman
Submit draft Annual Governance Statement
to the Audit Committee for 20/21 Plan 30-Jun-2021 Annual Governance Statement submitted to Audit Committee 16 June
2021. Andi Priestman
Continue to improve and deliver the
Assurance Statement to support the Annual
Governance Statement
31-Mar-2022 Presentation given to PMRG and attended CO SMT meetings to provide
advice and support on the process. Andi Priestman
Deliver Internal Audit & Corporate Fraud plan
for 2021/22 31-Mar-2022
12 of 16 reviews completed with the final 4 carried over to the 22/23 plan.
Regular progress updates reported to Audit Committee (latest June 2022)
together with the Internal Audit Annual Assurance Statement for 2021/22,
setting out the completion status of the 2021/22 Audit and Fraud Plan.
Andi Priestman
Complete Internal Audit & Corporate Fraud
plan for 2020/21 31-Aug-2021 The 2020/21 audit plan is now complete. Andi Priestman
Review and update the long term finance
strategy 31-Mar-2022 An update on the Long Term Finance Strategy was reported to Council 27
October 2021 and the budget was set 9 March 2022. Laurence Slavin
Provide timely and accurate budgetary control
reporting for Council and associated bodies 31-Mar-2022 All budgetary control reports for Council and associated bodies prepared
and provided as planned. Gillian McNeilly
Report agreed savings options and
management adjustments through the
budgetary control process
31-Mar-2022 All reports prepared and submitted as planned. Gillian McNeilly
Provide timely and accurate financial
statements for the Council and associated
bodies
31-Mar-2022
The audits of the draft Statements are progressing as planned, with some
Statements now finalised for the West Dunbartonshire Leisure Trust and
Clydebank Property Company.
Gillian McNeilly
Provide finance services to the new West
Dunbartonshire Energy Ltd company 31-Mar-2022
Five of the six milestones were completed as planned. The final milestone
has been delayed due to issues with the Agresso upgrade project which
have had a knock on effect on this project. The revised completion date is
Adrian Gray;
Gillian McNeilly;
Jackie Nicol-

Page 5

Action Status Progress Due Date Note Owner
30 September 2022 and this will be carried over to the 22/23 delivery
plan.
Thomson;
Karen Shannon
Upgrade payments received governance
processes and IT systems 31-Mar-2022
The upgrade to the cash receipting system was implemented in January
2022. The service will continue to review on an ongoing basis to
continually improve and enhance options available in respect of payments
made to the Council.
Karen Shannon
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
COVID-19 impact on
Resources Service
Delivery
Resources SLA is faced with significant
delivery demands in relation to moving
services online, disruption, reduction and
quality.
20-Apr-2022 Based on experience throughout the
pandemic, the likelihood of COVID-19
impacting significantly on service delivery
and workforce is low, whilst recognising that
if it did happen then there would be some
level of disruption. Appropriate contingency
plans are in place to allow the vast majority
of tasks to be completed remotely should
another significant lockdown event occur.
Laurence Slavin
COVID-19 impact on
Resources Workforce
Resources SLA is faced with significant
workforce demands in relation to absence,
reduction, recruitment and wellbeing.
20-Apr-2022 Laurence Slavin
Failure to provide
assurance of the
system of financial
controls
Either Internal Audit or External Audit is
unable to provide assurances on the
Council's financial control environment
14-Apr-2022 New plan for 2022/23 presented to Audit
Committee in June. Andi Priestman
Debt is not recovered
efficiently or
effectively, with
inherent risk of
financial loss
The processes deployed in collection of
monies owed to the council are inefficient
and ineffective resulting in money not
collected on time or having to be written
off
29-Apr-2022
Effectively implement the Corporate Debt
Policy, ensure income maximisation in
collaboration with W4U. Improvements to
automation of collecting debt to be
considered and implemented.
Ryan Chalmers

Page 6

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Increase in the level
of rent arrears due to
the level of Welfare
Reform changes and
general state of
economy
The Council sees an increase in its level of
rent arrears due to lower disposable
income and national changes to the
national benefits regime and the ongoing
economic position
29-Apr-2022
Arrears have decreased however risk of
increase due to current cost of living linked
to energy and food cost increasing and
inflation.
Ryan Chalmers
National delays in
implementing Welfare
Reform changes;
ineffective ICT
systems or processes
e.g. with the DWP
affecting delivery of
Welfare Reform
changes
Issues with system supporting delivery of
Welfare Reform changes affects service
delivery
29-Apr-2022 No change in risk Ryan Chalmers
Failure to meet
statutory deadlines
for external returns
(including HMRC) and
financial statements
Finance Services failing to meet statutory
deadlines resulting in lost revenue or
penalty costs
20-May-2022
The risk assessment at year-end remains
unchanged. There are a range of controls in
place to ensure that the likelihood of this
risk occurring remains low.
Gillian McNeilly
Financial projections
are significantly
incorrect
Financial projections for both capital and
revenue are significantly incorrect for
various reasons – including unexpected
costs – resulting in insufficient reserves
being held
20-May-2022
The risk assessment at year-end remains
unchanged. In general, many factors that
influence this risk are out with our control,
including Scottish Government funding.
Future projections of cost continue to be
difficult to predict in key areas where cost
pressures are increasing nationally, for
example, utility costs, inflationary impacts,
and pressures on supply chains. These are
continually monitored and projections
updated.
Gillian McNeilly
Significant financial
funding reductions /
limitations from
Scottish Government
It is expected that the Council will be
faced with significant ongoing funding
reductions/limited increases from the
Scottish Government settlement. This is
based on recent settlements and ongoing
projected population change with West
Dunbartonshire.  This coincides with a
period where costs are expected to rise in
20-May-2022
As reported to the Council on 9 March 2022
the Scottish Parliament Information Centre
(SPICE) analysis of the UK Budget
highlighted that the total (unadjusted)
Scottish block grant will increase from £36.7
billion (excluding COVID funding) in
2021/22 to £41.8 billion by 2024/25. This is
a 2.4% real terms increase over the period
Gillian McNeilly

Page 7

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
relation to social care due to an aging
population; inflationary increases with RPI
at a level not seen since 1991; post-
COVID-19 ongoing costs; likely increased
cost of borrowing as interest rates
increase and pay award pressures linked
to inflation. The ongoing population
decline of West Dunbartonshire versus the
average population for the whole of
Scotland leads directly to funding
reductions with marginal impact on
service delivery cost/need. Pay awards
and other inflationary pressures are
expected to continue to be higher than
any settlement position.
COVID-19 introduces a risk in relation to
the potential net cost to the Council
versus the ongoing funding support and/or
financial flexibilities provided by the
Scottish Government, though this is
anticipated to be fully funded.
of the Spending Review. However this
increase is front loaded with a 7.7% real
terms increase in 2022/23 (10.6% cash
terms increase) followed by small
percentage real term reductions in the
following two years. Despite the 10.6% cash
increase in the Scotland Block Grant in
2022/23, the Council’s general revenue
grant in 2022/23 was virtually flat cash. As
a flat cash allocation has occurred in the
year where the Scotland Block Grant has
increased significantly, and future year cash
increases are far lower, it is almost certain
there will be reductions to Local
Government funding in future years.
Efficient and effective frontline services that improve the everyday lives of residents
A committed and skilled workforce
Action Status Progress Due Date Note Owner
Continue to develop staff within Finance
services to ensure they have the appropriate
training and knowledge to support service
needs and transformational projects within
the Council
31-Mar-2022 Specific staff training is ongoing as accounting developments are
announced, with planned training completed. Gillian McNeilly
Carry out a survey of employees in relation to
121s, team meetings and communication 31-Mar-2022
Surveys are now undertaken in different ways, linked to the corporate
approach to staff surveys. Furthermore communications with Resources
staff is now being carried out in a different way than in previous
years. Consequently this action has been discontinued.
Laurence Slavin
A continuously improving Council delivering best value

Page 8

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Number of service user feedback
processes undertaken and evaluated 5 12 3
Internal Audit seeks feedback from services
following each audit and this is embedded in
their audit process. In 2022/23, 12 surveys
were carried out and the feedback used to
improve the process.
Laurence Slavin
Percentage of income due from
council tax received by the end of
the year %
94.18% 94.53% 93.5%
Target met and improved on collection rate
in 21/22 due to close working with debt
partners.  It is positive that collection has
improved given the continued impact that
COVID-19 had in 2021/22 on the ability of
people to pay council tax.  The Council
continued to allow eased payment terms and
follow up processes to assist residents
impacted, provided key financial support and
assistance during the year and would expect
payments to be caught-up in future years.
Ryan Chalmers
Number of invoices paid within 30
calendar days of receipt as a
percentage of all invoices paid
91.37% 91.5% 93%
Target narrowly missed due to delays from
services in sending invoices for processing.
We will continue to communicate to services
the importance of processing invoices on
time.
Stella Kinloch
Income generated as a % of total
revenue budget 11.11% Not yet
available 13% This will be available at the end of August. Gillian McNeilly
Action Status Progress Due Date Note Owner
Use benchmarking data to evaluate service
delivery and performance within Internal
Audit & Fraud
31-Mar-2022 Participated with other councils involved in the benchmarking process
throughout the year. Andi Priestman
Increase levels of process automation across
the Council to improve efficiency 31-Mar-2022
New and improved automations were delivered throughout the year. There
were some delays due to technical challenges which were reported to both
the Digital Board and the Automation Board. This impacted the Sickness
Absence automation which will now be carried into 2022/23 for delivery by
end of August 2022 and will form part of the wider pipeline of
automations.
Arun Menon
Continue the development of Agresso
reporting functionality to maximise
automation for annual national returns (e.g.
LFR, WGA, POBE, Financial Statements)
31-Mar-2022
Planned work is ongoing in two areas, Valuation Joint Board and West
Dunbartonshire Energy Company. Both slipped due to external factors out
with our control and will be continued in 2022/23.
Gillian McNeilly

Page 9

Action Status Progress Due Date Note Owner
Develop Finance leadership, governance and
controls across the Council 31-Mar-2022 Work is ongoing in specific areas due to staffing vacancies. This action will
be continued into 2022/23. Gillian McNeilly
Implement appropriate levels of service
satisfaction surveys 31-Mar-2022 Surveys were undertaken with Internal Audit and feedback used to inform
improvement. Laurence Slavin
Action Status
Overdue
Completed
Cancelled
PI Status
Significantly Missed Target
Narrowly Missed Target
Met or Exceeded Target
Data Only
Long Term Trends
Improving
No Change
Declining
Short Term Trends
Improving
No Change
Declining
Risk Status
Alert
Warning
OK

Page 10

Appendix 2: Quality Standards - Year-end Progress
Business Support
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Time (days) for processing
applications for new Housing Benefits
claims from the date of receipt of the
application to the day on which the
claim is decided
18 24 24
Target met despite the increase in caseload
and changes in reported circumstances which
impacts the volume of work being received
by the section.
Ryan Chalmers
Time (days) for processing
applications for notifications of
changes of circumstances for
Housing Benefits from the date of
receipt of the application to the day
on which the claim is decided
3 2.9 5
Target met and performance has improved
despite the increase in number of changes
being actioned by the section.
Ryan Chalmers
Number of invoices paid within 30
calendar days of receipt as a
percentage of all invoices paid
91.37% 91.5% 93%
Target narrowly missed due to delays from
services in sending invoices for processing.
We will continue to communicate to services
the importance of processing invoices on
time.
Stella Kinloch
Finance
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Number of errors within VAT returns
submitted to HMRC 2 1 0
Following standard sample checking
processes within the Council, one voluntary
disclosure was made.
Gillian McNeilly;
Karen Shannon
Percentage of weekly treasury
summaries issued within 5 working
days of week end
100% 100% 100% All reports were delivered within the
timescale agreed.
Gillian McNeilly;
Jackie Nicol-
Thomson
Percentage of new insurance claims
dealt with within 5 working days 96.2% 99.5% 100%
The target was narrowly missed with only 1
claim from 200 not meeting the 5 working
day target.
Karen Shannon
Percentage of reconciliations signed
off by the end of the following period 83.65% 68.4% 100% There was a drop in the PI mainly due to job
rotation/training to increase resilience within
Gillian McNeilly;
Karen Shannon
Appendix 2

Page 11

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
the team as per an Audit recommendation.
We will continue to aim to meet the target.
Percentage of budgetary control
reports completed by due dates 100% 92% 100%
All reports were submitted by required dates
with the exception of the year-end report
which was due to Council in June but will
now go in August together with the draft
financial statements.
Gillian McNeilly
Internal Audit & Fraud
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of draft audit reports
issued within 21 days of fieldwork
completion
100% 100% 90% Target met with all draft reports issued
within the timescale. Andi Priestman
Percentage of final audit reports
issued within 14 days of issue of
draft report
84.6% 83.3% 100%
While target was missed, some final reports
were issued just outside the agreed service
standard but delay was not excessive.
Andi Priestman
Level of full compliance with the
Public Sector Internal Audit
Standards (PSIAS)
92% 95% 90%
Target met. Annual Review of PSIAS has
confirmed a high level of general
conformance to the requirements. An
external assessment will be carried out in
2022/23.
Andi Priestman
Percentage of respondents who rate
the overall quality of internal audits
as satisfactory or above
100% 100% 100%
Target met. Feedback forms received are
analysed on an ongoing basis to inform
continuous improvement.
Andi Priestman
Percentage of audits completed on
time and within budget 73.7% 83% 85%
Target narrowly missed. Improved position
from 20/21 in terms of adherence to budgets
and service standards.
Andi Priestman
Percentage of agreed Red and Amber
rated internal audit action plans
followed up
100% 100% 100% Target met. Andi Priestman
Number of training hours undertaken
to support CPD requirements 100 100 100 Target met. All staff undertake relevant CPD
courses as required by professional bodies. Andi Priestman

Page 12

PI Status
Significantly Missed Target
Narrowly Missed Target
Met or Exceeded Target
Long Term Trends
Improving
No Change
Declining
Short Term Trends
Improving
No Change
Declining