Appendix 1: Regulatory & Regeneration Delivery Plan 2020/21 - Year-end Progress
A strong local economy and improved job opportunities
A growing economy
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Number of businesses given advice
and assistance to start up through
Business Gateway
200 201 200
During 2021/22, 201 business start-ups were
supported through the Business Gateway
service which slightly exceeded the target of
200.
Gillian Scholes
No of business gateway start-ups per
10,000 population 22.3 Not yet
available 21.98
2021/22 data for this Local Government
Benchmarking Framework indicator will be
available in the first quarter of 2023
following publication by the Improvement
Service.
Gillian Scholes
Cost of Economic Development &
Tourism per 1,000 population 155,060 Not yet
available 150,000
2021/22 data for Local Government
Benchmarking Framework cost indicators will
be available in the first quarter of 2023
following publication by the Improvement
Service.
Gillian Scholes
Proportion of properties receiving
superfast broadband 98.4% Not yet
available 100%
Data will be available from the 2022 Ofcom
Connected Nations Report which has yet to
be published.
Gillian Scholes
Town Vacancy Rates 15.67% 16.58% 11.4%
A survey of ground floor town centre
commercial units (excluding pubs, cinemas
and amusements) was undertaken in June
2022. Vacancy rates were higher than the
target owing to shop/business closures
during the pandemic and the downturn in
town centre activity being experienced
nationwide, but also some managed
vacancies related to town centre
regeneration. Individual town centre vacancy
rates were: Alexandria, 17.86%; Clydebank,
14.04%; and Dumbarton 19.33%.
Alan Williamson
Appendix 1

Page 2

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Immediately available employment
land as a % of total land allocated
for employment purposes
40 38.95 42.5
The 2021/22 figure is based on survey work
undertaken in May/June 2022 and correlates
with the 2021/22 SLAED indicator return.
The figure is below target, however future
targets will be based upon a national average
figure.
Alan Williamson
Action Status Progress Due Date Note Owner
Ensure key regeneration sites are progressed
to enable  high quality development to be
achieved on the ground
31-Mar-2022
Planning & Building Standards continue to support the key regeneration
sites. The Queens Quay Health and Care Centre is now operational; the
affordable housing development is scheduled for occupation in late 2022;
and we are supporting the discharge of conditions on the planning
permission in principle on the Exxon development.
Pamela Clifford
Monitor the development of the key
regeneration sites to ensure they comply with
the approved consent
31-Mar-2022 Completed as planned for 2021/22. Pamela Clifford
Deliver key regeneration sites across West
Dunbartonshire 31-Mar-2022 Actions completed for this period. As the new Economic Development
Strategy is developed, details of actions will be set out in that plan.
Gillian
McNamara;
Pamela Clifford
Explore commercial opportunities in our town
centres 31-Mar-2022 Artizan Centre acquisition completed March 2022. Gillian
McNamara
Deliver the Town Centre Recovery Plan 31-Mar-2022 A number of different interventions have been delivered, including 'Loves
Local', Loves Local gift cards, and town centre COVID adaption grants.
Gillian
McNamara
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Failure to deliver
Queens Quay
Masterplan
Following completion of Council
investment there is a risk the housing plot
sales do not materialise in the next 3-7
years.
13-Apr-2022 Focus continues on landowners securing
new housing developments for the site.
Gillian
McNamara;
Pamela Clifford
Inability to meet
demands of Council
to progress
regeneration projects
within desired
timescales
The number and complexity of
regeneration projects is putting
considerable strain on the resources
available which can be exacerbated by
delays out with the control of the service
13-Apr-2022
Individual projects continue to progress,
reducing the likelihood of undesirable
outcomes.
Pamela Clifford;
Alan Douglas;
Gillian
McNamara

Page 3

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
and when pinch points on different
projects occur at roughly the same time.
Supported individuals, families and carers living independently and with dignity
Improved wellbeing
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Air Quality: PM10 Concentration 9 8.7 18
The value is well within the national target of
18ug (micrograms) and both the short and
long trends are improving.
Mark Walsh
% of air quality monitoring stations
complying with the national objective
for nitrogen dioxide  at the nearest
building façades of residential
properties , schools, hospitals and
care homes (40ug/m3 NO2 )
100% 100% 100% Target met with all 33 monitoring stations
complying with the national objective. Mark Walsh
Percentage of highest priority pest
control service requests responded to
within 2 working days
98% 98% 95%
Target met. Of the 1,523 service requests
received, 1493 were responded to within
target.
John Stevenson
Percentage of service users
(businesses) very satisfied or fairly
satisfied with the service they
received from environmental health
100% 100% 95% Target met. Eilidh Paton
Percentage of service users (citizens)
satisfied or very satisfied with the
service they received from
environmental health
90% 92.3% 85%
Target met. Of the 442 service users
surveyed during the year, 408 were satisfied
or very satisfied with the service they
received.
John Stevenson
Percentage of businesses and
activities regulated by environmental
health who are substantially
compliant with legislative
requirements
94% 95% 75%
Target met. 1,148 businesses and other non-
commercial establishments were inspected
during the year and 1,095 were found to be
substantially compliant with legislative
requirements.
John Stevenson
Total annual redress won for
consumers by Trading Standards
Group (£)
£5,030.0
0 £15,509.50 N/A
Value of redress is up from previous year.
Most consumer advice is dealt with in the
first instance by our partner Consumer
Annemarie
Clelland

Page 4

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Advice Scotland. In general, only the more
complex complaints or those involving
criminal allegations come to Trading
Standards.
Food Law: Percentage of food
businesses in the highest risk
category (1 to 6 monthly inspections
by Food & Business Group) that were
inspected on time
100% 100% 100%
Inspections were suspended due to COVID-
19 until October 2021. We have achieved full
compliance since the inspection programme
restarted.
Eilidh Paton
Food Law: Percentage of food
businesses in the high risk category
(12 monthly inspections by Food &
Business Group) that were inspected
on time
100% 56% 100%
The suspension of programmed food safety
inspections from mid-March 2020 until 1
October 2021 resulted in a backlog. With
between 70 to 80 inspections due per month,
this had a significant impact on
Environmental Health staff resources in
2021/22 which will continue in 2022/23. A
number of factors exacerbated this including
the increased demands of the new Food Law
Rating Scheme, in terms of frequency and
scope of intervention, and a deficit of 2.89
Full Time Equivalent posts within the Food
Business Group over the period. The latter is
being addressed via recruitment and should
have a positive impact on performance.
Eilidh Paton
Percentage of service users satisfied
or very satisfied with the service
they received from trading standards
100% N/A N/A 80% N/A N/A
Feedback was received from only a handful
of service users which was too few to inform
this PI. We will review the way in which we
gather feedback to inform how we do this in
future.
Annemarie
Clelland
Percentage of businesses satisfied or
very satisfied with the service they
received from trading standards
100% N/A N/A 80% N/A N/A
None of the 19 businesses that received
business advice provided feedback. We will
review the way in which we gather feedback
to inform how we do this in future.
Annemarie
Clelland
Cost of trading standards per 1,000
population £
£3,498.0
0
Not yet
available £3,227.00
2021/22 data for Local Government
Benchmarking Framework cost indicators will
be available in the first quarter of 2023
following publication by the Improvement
Service.
Annemarie
Clelland

Page 5

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Cost of environmental health per
1,000 population £
£12,497.
00 £9,808.00 £14,968.00
This is a draft figure based on 2020 Mid-Year
Estimate of population rather than Mid-Year
Estimate 2021 which has not yet been
published. However, it is unlikely to change
significantly. The decrease in cost over
previous year is due to staff turnover
savings. Final 2021/22 data for this Local
Government Benchmarking Framework cost
indicator will be available in the first quarter
of 2023 following publication by the
Improvement Service.
John Stevenson
Number of reports of bogus/cold
callers 14 59 N/A
The high figure is in part due to projects
being run throughout the year to raise
awareness and install call blocking
equipment on the phones of vulnerable
people.
Annemarie
Clelland
Action Status Progress Due Date Note Owner
Work with Public Health Scotland to ensure
the whole system approach is supported with
effective strategy, policy, collaborative
working and effective targeting of resources
in public health priority areas
31-Mar-2022 Engaged with Public Health Scotland during the year re the pandemic
response.
Environmental
Health Team
Work with national and regional stakeholders
to mitigate the further effects of EU exit on
food trade including imports
31-Mar-2022
Worked in partnership with Food Standards Scotland and Scottish
Government to develop Food Import controls for which local authorities
are responsible for implementing.
Environmental
Health Team
Implement a restart of Food Law
interventions and any changes to Service
Planning and Administration and Enforcement
Sanctions as a result of changes to or new
code/s of practice from Food Standards
Scotland
31-Mar-2022
Food Law safety inspections recommenced 1 October 2021. While this
action has been completed, the suspension of the programme for 18
months from mid-March 2020 resulted in a backlog. With between 70 to
80 inspections due per month, this had a significant impact on
Environmental Health staff resources in 2021/22 which will continue in
2022/23. A number of factors exacerbated this including the increased
demands of the new Food Law Rating Scheme the frequency and scope of
interventions, and a deficit of 2.89 Full Time Equivalent posts within the
Food Business Group over the period (recruitment ongoing). That said,
since the inspection programme restarted, we have prioritised those in the
highest risk category with full compliance achieved.
Environmental
Health Team

Page 6

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Post EU exit risk for
Environmental Health
WD is a port health authority. It does not
have status as a Designated Point of Entry
/ Border Control Post for food imports.
Border Control Posts are targeted for
development in Scotland in advance of the
end of the transition period covering
imports in 2021 including inland control
areas. An Environmental Health presence
will be required for these control areas.
The lack of food import physical and
regulatory infrastructure and regulatory
capacity could negatively affect the food
market and bring a heightened food fraud
risk.
Environmental Health is responsible for
food law inspection and food import and
export controls. The national need and
infrastructure to support business is
encompassed in national work streams
and scoping to ensure national needs are
met, including expanding EH resource,
logistics and infrastructure. WDC
Environmental Health is engaged with
work streams and contingency planning.
There could be significant impact /
disruption to statutory service provision
(Food Law, Health and Safety and Public
Health Protection) in dealing with import
demands.
13-May-2022
The majority of EU Exit risks were
addressed in terms of export services being
agreed and transition period for unfettered
food import. Import food controls, taking
into account the Northern Ireland protocol,
are being developed in partnership with
Food Standards Scotland and Scottish
Government.
Pamela Clifford;
John Stevenson
More affordable and suitable housing options
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of private landlord
applications administered and
processed  within 21 days
99% 99% 95%
Target met. Of the 540 registrations received
for approval, 535 were administered and
processed within the 21 days target.
John Stevenson

Page 7

Action Status Progress Due Date Note Owner
Provide further legal assistance in the
negotiation and completion of the requisite
legal agreements in relation to the new
affordable housing programme
31-Mar-2022 Year-end review confirmed support was provided as required to the new
housing programme. Alan Douglas
Ensure the next phase of Queens Quay
Housing is delivered 31-Mar-2022 While there have been delays experienced with private developer securing
private housing, all actions within Council control have been completed.
Gillian
McNamara
Meaningful engagement with active, empowered and informed citizens who feel safe and engaged
Fully consulted and involved citizens who are able to make full use of the Community Empowerment Act
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Average score for respondents who
state they feel a sense of control and
influence in relation to Council
decision-making and service delivery
5.4 5.4 5.4
This indicator is sourced from the Place
Standard survey work that is undertaken by
the Council. It covers the physical elements
of a place, e.g. buildings, spaces, transport
links, as well as the social aspects, including
whether people feel they have a say in
decision making. The most recent data
relates to 2019/20, as the survey is not
taken annually. Each indicator in the Place
Standard is marked out of 7, so an average
respondent score of 5.4 can be considered
reasonable.
Alan Williamson
Open, accountable and accessible local government
Equity of access for all residents
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
% of committee agendas published
within standing order timescales 100% 100% 99% Target met.
George
Hawthorn;
Christine
McCaffary

Page 8

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Failure to organise
elections well,
particularly during
the COVID-19
pandemic, resulting
in reputational
damage to the
Council.
COVID–19 Additional risks associated with
spread of infection, availability of suitable
premises, and availability of experienced
polling staff will increase risk of election
being poorly run.
Election risk register will highlight and
record the various mitigations to reduce
risk.
25-May-2022
Measures were developed to mitigate the
risk of infection for all election processes for
the Scottish Parliamentary Election in May
2021 and implemented for the local
government election in May 2022. That
election was organised and implemented
successfully. This is no longer a risk going
forward to 22/23.
George
Hawthorn
Efficient and effective frontline services that improve the everyday lives of residents
A continuously improving Council delivering best value
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Planning applications (major
developments) - average number of
weeks to decision
11.2 10.3 20
Target well exceeded and is well above the
Scottish national average for major
developments
Pamela Clifford
Planning applications (householder) -
average number of weeks to decision 9.5 8.5 7
While the target was missed, performance
has improved over the short and long terms.
Staff resources, workload balancing and
vacancies within the team during a
substantial part of the year resulted in some
applications exceeding the target. The focus
for the year ahead will be reducing the
overall time taken to issue decisions as
staffing levels have now improved.
Pamela Clifford
Planning applications (local
development, excluding householder)
- average number of weeks to
decision
12.7 12.5 12
While the target was narrowly missed,
performance has continued to improve year-
on-year.
Pamela Clifford
Percentage of Environmental Health
service requests from citizens first
responded to within 2 working days
97% 97% 90%
Target met. Of the 3,422 service requests
received, 3,307 were responded to within
target.
John Stevenson
Percentage of building warrant
applications responded to within 20
working days
82% 87% 80% Target exceeded and performance continues
to improve year-on-year. Judi Ferguson

Page 9

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Overall time taken to issue building
warrant (weeks) 15.1 16 16 Target met. Judi Ferguson
Cost per planning application £6,625.0
0
Not yet
available £4,800.00
2021/22 data for this Local Government
Benchmarking Framework indicator will be
available in the first quarter of 2023
following publication by the Improvement
Service.
Pamela Clifford
Average time taken to deliver a
commercial planning application
decision
10.37 13 8.5 Target missed, largely due to a legacy
application in the first quarter of 2021/22. Pamela Clifford
Action Status Progress Due Date Note Owner
Support the establishment of the West
Dunbartonshire Energy LLP Strategic and
Management Board through the development
of rules surrounding the interaction of
members, as well as providing day to day
legal advice
31-Mar-2022 Year-end review confirmed support was provided as required. Alan Douglas
Designate and train service data ambassadors
for the Corporate Data Information
Management System (MAGIC) system
31-Mar-2022
While this action was started and some progress made, it was on hold for
several months due to long term absence. It was recommenced in early
2022 and will be carried over to 2022/23.
Alan Williamson
Assess the implications of the new measures
being introduced by the Scottish Government
in relation to the  Planning Act (Scotland)
2019
31-Mar-2022 This has been assessed and appropriate action taken to ensure
compliance. Alan Williamson
Co-ordinate the refurbishment of civic areas
of Clydebank Town Hall 31-Aug-2021
The majority of works have now been completed, leaving only the
woodwork in the chamber and the toilet/kitchen area to be completed. It
is anticipated that remaining works will be completed by August 2022.
George
Hawthorn
Co-ordinate the organisation of remaining
civic events to commemorate the 80th
Anniversary of the Clydebank Blitz
31-Mar-2022 All planned events have now been completed George
Hawthorn
Organise and implement the Scottish
Parliamentary Election 30-Jun-2021 Scottish Parliamentary Election organised and implemented successfully. George
Hawthorn

Page 10

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Failure  to monitor
and enforce
regulatory areas with
public risk
The Council fails to comply with statutory
regulatory duties in respect of
environmental health, trading standards
and licensing laws
27-Apr-2022
This continues to be a risk together with
COVID recovery. Approval was however
granted at the Council budget meeting on
9/3/2022 for the recruitment of an
additional two Environmental Health Officer
posts and recruitment is underway.
John Stevenson
COVID-19 impact on
Regulatory &
Regeneration Service
Delivery
Regulatory & Regeneration is faced with
significant delivery demands in relation to
moving services online, disruption,
reduction and quality.
28-Apr-2022
While the move to home working was
largely successful there was a natural drop
in efficiency in some areas which was
impossible to completely remove. As access
to the office has increased this issue has
receded. As the economy opens up some
services are experiencing additional
pressure.
Regulatory and
Regeneration
Managers
COVID-19 impact on
Regulatory &
Regeneration
Workforce
Regulatory & Regeneration is faced with
significant workforce demands in relation
to absence, reduction, recruitment and
wellbeing.
28-Apr-2022
The principle risk here continues to relate to
significant staff being absent either due to
COVID or self-isolation particularly in front
line services where working from home is
not as suitable. Appropriate safety
measures are in place (processes have been
risk assessed) to minimise the likelihood of
this happening. As a result, the risk score
remains low.
Regulatory and
Regeneration
Managers
Income for services
continues to be
dramatically reduced
as a result of the
COVID-19 pandemic
Relates to registration, licensing, planning
and building standards which have been
impacted as a result of the COVID-19
pandemic
28-Apr-2022
Income reduction as a result of the
economic impact of COVID remains an
issue.
Regulatory and
Regeneration
Managers
Failure to adequately
respond to an
emergency situation
such as a multiple
fatality workplace
accident, outbreak of
food borne
communicable
disease, a major
public health incident
or pandemic
There is a national shortage of qualified
staff in Environmental Health, across
Scotland. This impacts on West
Dunbartonshire Council. Vacancy levels at
WDC might impact on our ability to
respond to emergencies.
27-Apr-2022
Although the Service Co-ordinator and two
Environmental Health Officer vacant posts
were filled towards the end of 2021, the
sudden and tragic death of the Manager of
Environmental Health created additional
challenges for the Service. Interim
arrangements have been made to cover the
vacant Manager's post but this has created
further vacancies within the Service and
increased work roles. The approval of the
two new additional Environmental Health
John Stevenson

Page 11

Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Officer posts should help assist in covering
any additional service demands.
Inability to recruit
successfully to enable
performance to be
maintained
There is a current issue with recruitment
of qualified staff in various parts of the
service.
13-May-2022
Two vacancies in Environmental Health are
now being filled and vacancies in Planning
are being filled or out for advert. In
addition, Building Standards has introduced
a new service delivery model and new
staffing.
Pamela Clifford
Sustainable & attractive local communities
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Tonnage of carbon dioxide emissions
from Council operations and assets 23,635 24,022 22,803
The Council’s carbon footprint in 21/22 was
24,022 tonnes of CO2e, just missing the
target of 22,803.  Stricter carbon reduction
targets set by the Climate Change Strategy
mean that annual reductions will be more
challenging to achieve net zero by
2045.  However, it should be expected that
there will be fluctuations on our carbon
reduction journey towards 2045. There were
significant challenges to meeting the target
relating to the following:
COVID 19 Pandemic - The pandemic had
an unprecedented impact on our Council
operations and residents.  More staff work
remotely and as a result we have had to add
carbon emissions from homeworking to the
Council’s overall carbon footprint.  Emissions
relating to energy, waste and travel have
also increased because, like the whole world,
West Dunbartonshire is ‘bouncing back’ from
the pandemic.
Waste Streams – Waste and recycling
make up almost 52% of the Council’s carbon
footprint.  Waste levels, particularly from
residents, have been increasing since
2012/13, with the highest recorded
emissions occurring in 2021/22.  Since waste
Adam Armour -
Florence

Page 12

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
is the largest proportion of Council
emissions, improvements to emissions from
other sources do not have as much of an
impact on our carbon footprint.
Heating – Heating makes up about 20% of
the Council’s carbon footprint.  Whilst carbon
emissions for heating have decreased
slightly, the benefits of our energy efficiency
interventions have been impacted by
ventilation requirements in schools as a
result of the pandemic.  Heating will work
harder and go on for longer as a result of
windows and doors having to be open across
all of our schools.
We will continue to implement the actions set
out in the Climate Change Strategy Action
Plan for 2022/23.
Action Status Progress Due Date Note Owner
Ensure Council has positioned the Energy
Centre to showcase best practice at COP26 31-Mar-2022 Energy Centre successfully showcased at COP26. Gillian
McNamara
Develop a Climate Change Action plan to
support the implementation of the Climate
Change Strategy and ensure it is devolved
and mainstreamed
31-Mar-2022
Action Plan officially signed-off on 27 October 2021.  Now complete.
Next steps are to integrate initial actions into Pentana and allocate KPIs,
etc.
Gillian
McNamara
Risk Description Current Assessment Target Assessment Date Reviewed Note Owner
Affordability of the
Exxon City Deal
Project
There is a risk that the affordability of
delivering the City Deal Exxon project is
beyond the resources being made
available from Glasgow City Region City
Deal.
13-Apr-2022
The project board continues to monitor
budget challenges including inflation and
BREXIT challenges which are likely to
impact affordability.
Gillian
McNamara

Page 13

Action Status
Overdue
Completed
PI Status
Significantly Missed Target
Narrowly Missed Target
Met or Exceeded Target
Data Only
Long Term Trends
Improving
No Change
Declining
Short Term Trends
Improving
No Change
Declining
Risk Status
Alert
Warning
OK

Page 14

Appendix 2: Quality Standards 2021/22 - Year-end Progress
QS PIs Democratic & Registration
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of Council and Committee
minutes produced within 3 clear
working days of the meeting
100% 99.25% 98%
Target met. A slight delay in producing some
minutes has occurred due to additional
pressure on team due to numbers needed to
cover hybrid meetings.
Christine
McCaffary
Percentage of all committee actions
uploaded onto Pentana within 3 clear
working days of the draft minute
being approved
100% 99.5% 98% Target met. Christine
McCaffary
% of committee agendas published
within standing order timescales 100% 100% 99% Target met.
George
Hawthorn;
Christine
McCaffary
QS PIs Legal (including Trading Standards)
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of consumer complaints
first responded to within two working
days
97.7% 85% 95%
While the target was missed, performance
remains high. The loss of a number of
officers coupled with investigations and
higher priority matters impacted on our
ability to respond within the current target of
two working days. Through the recruitment
of new staff members in the coming year we
should be in a better position to meet this
target going forward.
Annemarie
Clelland
Percentage of business advice
requests first responded to within
two working days
96.5% 100% 95%
Target exceeded. This figure includes our
standard business advice and advice to
businesses on trading safely during the
pandemic. It was and remains important that
businesses can access reliable and timely
advice.
Annemarie
Clelland
Appendix 2

Page 15

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
PS4biii: Percentage of trading
standards  business advice requests
that were dealt with within 14 days
96.5% 98% 100%
While the target was narrowly missed, the
value remains very high. The speed at which
Government advice and legislation changed
during the pandemic meant that for more
complex queries advice had to be sought.
Annemarie
Clelland
QS PIs Planning & Building Standards (including Environmental Health)
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of highest priority pest
control service requests responded to
within 2 working days
98% 98% 95%
Target met. Of the 1,523 service requests
received, 1493 were responded to within
target.
John Stevenson
Planning applications (householder) -
average number of weeks to decision 9.5 8.5 7
While the target was missed, performance
has improved over the short and long terms.
Staff resources, workload balancing and
vacancies within the team during a
substantial part of the year resulted in some
applications exceeding the target. The focus
for the year ahead will be reducing the
overall time taken to issue decisions as
staffing levels have now improved.
Pamela Clifford
Percentage of Environmental Health
service requests from citizens first
responded to within 2 working days
97% 97% 90%
Target met. Of the 3,422 service requests
received, 3,307 were responded to within
target.
John Stevenson
Percentage of high priority planning
enforcement breaches responded to
within 5 working days
100% 100% 100% Target met. Pamela Clifford
Percentage of building warrant
applications responded to within 20
working days
82% 87% 80% Target exceeded and performance continues
to improve year-on-year. Judi Ferguson
Percentage of private landlord
applications administered and
processed  within 21 days
99% 99% 95%
Target met. Of the 540 registrations received
for approval, 535 were administered and
processed within the 21 days target.
John Stevenson
Food Law: Percentage of food
businesses in the highest risk
category (1 to 6 monthly inspections
100% 100% 100%
Inspections were suspended due to COVID
until October 2021. We have achieved full
compliance since the inspection programme
restarted.
Eilidh Paton

Page 16

Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
by Food & Business Group) that were
inspected on time
Food Law: Percentage of food
businesses in the high risk category
(12 monthly inspections by Food &
Business Group) that were inspected
on time
100% 56% 100%
The suspension of programmed food safety
inspections from mid-March 2020 until 1
October 2021 resulted in a backlog. With
between 70 to 80 inspections due per month,
this had a significant impact on
Environmental Health staff resources in
2021/22 which will continue in 2022/23. A
number of factors exacerbated this including
the increased demands of the new Food Law
Rating Scheme, in terms of frequency and
scope of intervention, and a deficit of 2.89
Full Time Equivalent posts within the Food
Business Group over the period. The latter s
is being addressed via recruitment and
should have a positive impact on
performance.
Eilidh Paton
PI Status
Significantly Missed Target
Narrowly Missed Target
Met or Exceeded Target
Data Only
Long Term Trends
Improving
No Change
Declining
Short Term Trends
Improving
No Change
Declining