2026/27
CITIZEN, CULTURE AND
FACILITIES 
ITEM 8 - APPENDIX 2

Page 2

APPENDIX 2 – Revised Version 
Contents 
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 6
4. Resources .................................................................................................................................................................................................... 13
Appendix 1: Action Plan .......................................................................................................................................................................................... 16

Page 3

1. Introduction 
Citizen, Culture and Facilities comprises a wide range of services covering Citizen Services, Strategic Communications, Facilities Management
& Town Hall, Libraries and Cultural Services and Performance and Strategy and monitoring of West Dumbartonshire Leisure Trust. It is one of
seven strategic areas responsible for delivering the Council’s Strategic Plan. Key actions to help achieve this are set out in this Delivery Plan,
together with actions to address any performance challenges and service priorities identified in the planning process. 
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services Committee twice yearly,
at mid-year and year-end. 
2. Performance Review 
The CCF management team completed a detailed review of 2025/26 performance, focusing on the following: 
• 2025/26 Delivery Plan year-end progress
• Local Government Benchmarking Framework (LGBF) comparative data
• Citizens’ Panel feedback;
• Complaints; and 
• Continuous Improvement 
This review highlighted our key achievements and challenges in 2025/26. These are summarised below. 
Key Achievements in 2025/26 
Listed below are some of the major achievements in each service area. All services achieve many other key outcomes for the Council and its
residents throughout the year which are not recorded here but are as important. 
Citizen, Libraries and Digital Services 
• External Funding was used by libraries to deliver digital sessions to local Deaf Community members. The British Deaf Association noted this
work as the first of its kind in Scotland.

Page 4

APPENDIX 2   
• Libraries obtained funding from Scottish Library and Information Council to establish its first Near Me Hub offering digital access to NHS
appointments from a private space in Clydebank Library 
• Government Digital Service (GDS) has concluded its second accessibility audit of WDC external website and confirms it meets the required
legal standards.
• Citizens Services processed significant number of Welfare Fund applications totaling 11,717. Of these 8815 were Crisis Grant and 2902 were
Community Care Grant 
• Contact Centre and Out of Hours service continued to work to identify ways to manage instances of unanticipated increases in call volumes
due to a number of unplanned events 
Facilities Management 
• New service model launched to enhance delivery, ensure resilience and support efficiencies.  
• Continued to secure income and bookings at Clydebank Town Hall hosting a variety of successful events including civic, awards, dance and
theatre shows and celebrations, in particular weddings. 
Strategic Communications, Culture & Performance 
• Provided comprehensive communications support for the budget process and implementation phase of service delivery changes as a result
of savings.
• Successful launch of the ancestry programme, including new income stream and strong public interest. 
• Successful opening and launch of Clydebank Museum and Heritage Hub.
• Developed and implemented budget consultation model with early engagement to inform the 2026/27 budget conversations and priorities.
• Provided a high level of equalities support during the budget process, ensuring Equality Impact Assessments (EIA) were completed
adequately for over 120 initiatives across the Council.   
Key Challenges in 2025/26 
Cross Service
• Resilience / Capacity Challenges. There is increasing demand and growing reliance on Citizen and Digital Services and Communications
to support the delivery of Council-wide efficiency savings. With reduced staffing levels and required changes to service delivery, overall
capacity is significantly impacted. This work frequently extends beyond planned timescales, delaying scheduled service specific initiatives as

Page 5

APPENDIX 2   
a result. Going forward, strict prioritisation and new approaches to service delivery, including service redesign where appropriate, will be
essential.
• Absence due to sickness. There is a significant level of sickness absence within CCF and this affects levels of service, particularly as the
teams now lack the capacity or resilience to cover due to efficiencies which have reduced the workforce. This leads to reduced level of
service, increased management time spent supporting absence, increased pressure and impacts on staff morale. 
• Delays in the capital programme. Delays in the delivery of Glencairn House Library and Museum and the subsequent effect on the
development and delivery of the publicly accessible collections store and archive at Strathleven Place have impacted on service delivery and
service satisfaction in both Libraries and Arts and Heritage. This requires reprioritisation within the service in conjunction with our colleagues
from the Corporate Assets team as the programme timelines are pushed out. 
Citizen, Libraries and Digital Services 
• The unplanned demand for calls continues to impact resource and service satisfaction.  
• Changes to ways of working within services increase the complexity and volume of calls to the Contact Centres and place additional demand
on the service with longer call handle time, and more time to resolve issues. This has impacted on the Council reputation indicators and
increased social media attention.
• There continues to be an increase in the volume and complexity of complaints which increases the time and capacity taken to resolve. 
• Increased reliance on the web and intranet including the growth in the size and content means increased hosting and bandwidth costs, added
pressure to maintain quality, accessibility, security and a continuing need to ensure information remains current particularly with services
responsible for keeping the web team informed of any changes. 
Facilities Management.
• High levels of absence continue to have an impact on available resource resulting in reduced workforce numbers and increased costs and
demands on existing teams.
• The rate of turnover coupled with the time taken to recruit and train employees continued to be a challenge. 
Strategic Communications, Culture & Performance 
• The Communications and Arts & Heritage teams continued to operate without a full complement of staff for most of the year resulting in
increased demand on staff and alternative service models being introduced.
• Council-wide changes to ways of working have resulted in the need for more complex communications support which requires additional
capacity and requires extended input, and this has put additional pressure on the Communications team.

Page 6

APPENDIX 2   
3. Strategic Assessment 
The CCF management team completed a strategic assessment to determine the major influences on service delivery and priorities in 2026/27.
The key factors are summarised below. 
Key Factors 
Financial Challenges   
The entire public sector is continuing to face significant financial challenges due to a range of factors including inflationary cost increases, pay
awards not being fully funded by the Scottish Government and insufficient overall funding to support the delivery of front line and back-office
services. The Council is currently faced with an estimated cumulative funding gap in 2027/28 of £10.905m rising to £44.028m by 2030/31. We
will continue to monitor the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected
Members throughout 2026/27. 
These challenges require further action to balance our budget and protect services for residents. Within Citizen Culture and Facilities, this means
available funding will be reduced over time and we will need to reconfigure how we work, what we do, where we work, and potentially reduce the
number of people employed. In this context, we will aim to continue to provide a sustainable, quality service to internal and external clients,
employees and citizens. 
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. In CCF income budgets are more susceptible to fluctuations given the uncertainties surrounding
demand. Within this service, budgets identified as being more susceptible to fluctuations are the Town Hall in respect of rising utility costs and
Facilities Management as a result of pressure on food costs in Catering. The Town Hall is also susceptible to fluctuations depending on levels of
income that are achieved.
Leisure Trust Management Fee

Page 7

APPENDIX 2 
The savings options agreed to deliver the 2026/27 budget have resulted in a reduction in the management fee paid to West Dunbartonshire
Leisure Trust (WDLT) for delivery of a range of leisure and sport services, including management of sport and leisure facilities, community
facilities, sports development, Active Schools, outdoor recreation facilities and events. The fee paid by the Council to WDLT for 2026/27 will be
reduced by 5%.
Citizen, Libraries and Digital Services 
Telephony Enhancements 
ICT have provided an upgraded corporate telephone system, this includes an upgrade to the contact centre telephony platform which will provide
more flexibility and functionality including call recording. In 2026/27 we will embed the system operationally, investigate and test the various
levels of functionality to maximise efficiency, provide resilience and help customers better. 
Reduce Contact Centre Resource
The savings options agreed to deliver the 2026/27 budget have resulted in a resource reduction in the Contact Centre. Currently Citizen
Services operates the Customer Contact Centre, Housing Repairs Contact Centre, the Scottish Welfare Fund, manages complains and provides
a reception at 16 Church Street. The Council recognises that for many people, their digital skills, literacy or deprivation can prevent them from
accessing the internet and for this reason it is important to maintain alternative means of contacting the Council. It is also recognised that for a
number of people the option to call rather than access services online is a preference rather than a necessity. Work will continue to promote
alternative methods of contacting or reporting issues to the Council including via email and the website. Over 2026/27 we will implement Contact
Centre revised team and service provision. 
Embed Libraries Strategy 
The Libraries Strategy document outlining a renewed vision and future operating model which aligns with local and national initiatives and
ambitions has been approved by management. In 2026/27 we will publish the strategy and continue to progress embedding it operationally with
all Libraries staff. 
Glencairn House – New Library Launch 
The redevelopment of Glencairn House into a combined museum/library facility via WDC’s successful Levelling Up Fund bid is nearing
completion and is being managed by Corporate Asset Management. The design includes relocation of Dumbarton Library to Glencairn House.
While relocation plans and a staffing model have been developed, unforeseen delays to completion and handover have impacted timescales.

Page 8

APPENDIX 2   
Following handover in 2026 we will progress the relocation and launch the service to suit the new library and Children’s Library in addition we will
develop a programme of activities that establishes Glencairn House and the Children’s Library as a central hub for community engagement with
library services. We will explore how to optimise the use of the new immersive technology installed in the Children’s Library, funded by the
Strathleven Foundation, and assess its potential to support our efforts in engaging new audiences. 
Relocate Library Services  
Libraries’ main office functions will relocate from Poplar Road to Strathleven Place. Libraries will contribute to the project team leading on
services relocating. This includes the mobile library, home delivery service, Learning Services and Library support functions. This initiative is tied
to the completion of Glencairn House. In 2026/27 we will continue to support the progress of the relocation with our colleagues in Asset
Management.   
Library Services Consultation
West Dunbartonshire Libraries are at the heart of our communities supporting reading, literacy, lifelong learning, cultural engagement, and
community wellbeing as well as ensuring inclusive digital access and welcoming spaces for all. Demand for Council services, and the associated
delivery costs, are increasing year on year with there being insufficient funding to absorb these increases. Consequently, the Council needs to
consider how best to meet the needs of communities within the reduced resources available.
To ensure library services continue to meet the evolving needs of local communities, we carried out a consultation in November 2025 to gain
feedback into how libraries are used, any barriers to access, and which services and resources are most valued. We received over 250
responses. Over 2026/27 we will report the consultation findings and our recommendations to shape delivery, ensuring that library provision
remains inclusive, sustainable, and aligned with community priorities. 
National Library Service Framework 
The How Good is Our Public Library Service framework is designed for public library services to evaluate the quality and effectiveness of their
service provision, to consider the value and impact of their services, identify areas for improvement, and demonstrate their contribution to wider
policy goals. It is divided into three Quality Indicators. In 2026-27 libraries will prepare for assessment of Quality Indicator 1 – Supporting
Reading. The service will grade their provision using the six-point scale graded from unsatisfactory to excellent. This will then go forward for peer
review. The national framework has recently been updated and it’s essential for the service to undertake this work to maintain access to external
funding streams.   
Website and Intranet Accessibility

Page 9

APPENDIX 2   
Web Content Accessibility Guidelines (WCAG 2.2 AA) is the new minimum accessibility standard for all UK Government public sector websites
and mobile apps. The UK government is monitored to confirm compliance. Over 2026/27 we will put actions in place to make sure the content on
the website is still complaint with the new standards and build a plan to address issues with the intranet, where accessibility can be enhanced. In
addition to comply with the upgraded Guidelines we will review the coding of the website to ensure it still complies and address any issues. 
Upgrade Content Management System
We will upgrade the Content Management System from V13 to V17 to ensure the platform remains secure, stable and fully supported and
maintain compliance with modern standards. 
Facilities Management Services 
Facilities Management Improvement Plan - Service Redesign 
A review of the FM management structure was undertaken in 2022/23 to respond to Scottish Government policy changes and resultant service
expansion, provide additional support for frontline employees and ultimately deliver a more efficient and sustainable service. A revised
management structure was introduced in 2023/24, alongside new policies, procedures and a staff training programme and during 2024/25 a
proposal for a new operating model developed.  In 2025/26, further training was delivered, the frontline service was redesigned, and a new
operating model across catering, cleaning and janitorial services implemented, including new roles, role profiles and enhanced training. During
2026/27, the focus will be on embedding the new ways of working through continued training, mentoring and staff engagement. 
Training and Capacity  
Appropriate training is a key requirement for the Facilities Management (FM) service. Establishing a centrally located training academy would
strengthen the delivery of consistent training and support across FM teams. A standardised approach would reduce training time, inconsistency,
and errors, while supporting skills development, refresher training, and awareness of new industry developments. Enhanced training improves
staff capability, service efficiency, and overall performance, while also providing clear progression opportunities for employees. This approach
supports the development of a cross-skilled workforce, ensures sufficient staff capacity, and builds greater service resilience. Progress during
2025/26 was limited due to the capacity required for the service redesign. In 2026/27, we will continue to work with colleagues in Education and
Working4U to develop an apprenticeship programme and explore options for establishing a training academy at Clydebank Town Hall. 
Good Food Nation Plan
The Good Food Nation (Scotland) Act 2022 provides a framework to progress toward Scotland being a Good Food Nation where people benefit
from the food they produce, buy, cook and serve and eat each day. A national consultation on proposals for the plan is complete. In 2025/26 FM

Page 10

APPENDIX 2   
worked alongside other service areas within the authority to review the outputs and understand the obligations as a result of the national work 
and inform the next steps in developing the required Council wide GFN plan. The commencement of section 10 of the Good Food Nation
(Scotland) Act 2022 begins the 12-month clock for relevant authorities (local authorities and territorial health boards) to produce “local” Good
Food Nation Plans with relevant authority Good Food Nation Plans due to be published on 1 April 2028. This plan will be Council wide and will
include a number of service areas. An internal working group has been established and will reconvene when the guidance from Scottish
Government is available. During 2026/27 we will work with other service areas to support the development of the Council wide action plan. 
Strategic Communications, Culture & Performance 
Strategic Communications Team 
Communication Plan to Support Budget Savings Initiatives
Following the budget meeting in March 2026, a number of savings options to balance the budget were agreed. There are a number of these
which will result in changes to the operation of frontline services and will require formal communications planning to ensure objectives are met,
target audiences are reached, and key messages are provided effectively. In 2026/27 bespoke communications plans will be developed to
support this activity in each service area. 
Communications Plans to Support Service changes – Operational support 
There is a growing number and diversity of service changes across the Council and the majority of these require strategic communications
support to help ensure residents clearly understand what is changing, why the change is happening, and how it will affect their experience. By
preparing communications plans in advance, the team ensures the Council is communicating in a way that is accessible, timely, and sensitive to
the diverse needs of the people who rely on our services. Each plan will identify which users may be most impacted, tailor information so it is
easy to understand, and choose the right channels. In 2026/27 we will work with Services across the council on the implementation of service
delivery changes to deliver proactive, transparent, and consistent communications plans to minimise disruption, support users through the
transition, and maintain trust by ensuring they feel informed. 
Arts & Heritage Team 
Glencairn House  
Work will continue to progress detailed exhibition design and content for the redevelopment of Glencairn House into a combined museum/library
facility. Following design workshops and feedback, content was developed to support an ambitious heritage activity programme for Glencairn

Page 11

APPENDIX 2   
House. Glencairn House will open to the public as a new state of the art library and museum. The completion was delayed from 2025 with
handover anticipated spring 2026 and will mean the phased opening is expected June 2026. In 2026/27 we will continue to support this progress
and will further progress the plans to support a programme of heritage engagement for Glencairn House.
Strathleven Place
In tandem with the Glencairn House redevelopment, planning will commence on the current Dumbarton Library building on Strathleven Place to
be converted into a publicly accessible archive and collections store for the Council’s most important heritage objects and documents.
In 2025/26 A&H progressed plans to review the storage areas and collections to prepare for the future decant to Strathleven House. In 2026/27
A&H in conjunction with our Assets colleagues will prepare and progress a plan for the mapping of storage and capacity and the safe relocation
of all museums, fine art, local history & archival collections and the relocation of the Arts & Heritage team from Poplar Road to Strathleven Place.   
Launch public access to A&H collections
Arts and Heritage have introduced two digitisation projects into the service in 2024-25 both of which significantly increase public engagement
with the services’ museum, fine art, local history & archival collections. The Ancestry Project sees the digitisation of name rich archive resources
for use in genealogy has been successfully completed. MODES replaces the previous ADLIB system and will provide public access to local
collections, benefitting research and engagement with our resources, also allowing for the management and maintenance of collections records
by the service. We have encountered technical issues which has delayed the launch of the public access to the collections. Our colleagues in
ICT are working with the third party providers to agree a solution. In 2026/27 following the technical issues being resolved we will progress the
launch of 10 databases plus access to Newspapers.com which will give online public access to local historical newspaper articles for the first
time.   
Culture Collective Bid  
Creative Scotland are providing funding to establish a Culture Collective that brings together a wide range of local artists and community
partners. The aim is to co-design and deliver a programme of cultural and artistic activity that strengthens local identity, supports creative
practice, and responds to community needs. The proposed funding of around £200,000–£250,000 would enable us to commission artists,
support community-led projects, and build the local infrastructure and resources needed to ensure meaningful long-term cultural development. In
2026/27 we will open dialogue with Creative Scotland and explore available funding to establish a Culture Collective for West Dunbartonshire
over the coming years. 
Accreditation – Clydebank Museum

Page 12

APPENDIX 2   
We will progress work to secure re-accreditation for Clydebank Museum through the Museum Galleries Scotland Museum Accreditation
Scheme. Achieving this accreditation demonstrates that we meet nationally recognised museum standards, and supports our ability to access
future funding streams, including those restricted to accredited museums. As part of the process, we must evidence compliance with key
standards such as strong governance, robust collections management, high-quality public engagement, and effective care and preservation of
collections. This renewal will ensure the museum remains well-positioned for ongoing development and future investment. 
Performance & Strategy Team 
Strategic Engagement 
In line with the Council’s Strategic Plan, to ensure our residents are engaged and empowered we will continue to review and strengthen our
approach towards strategic engagement with a particular focus on increasing participation from seldom heard voices, improving how we
feedback results to the community and partners, and exploring best practice with engagement tools. We will support the Council with budget
consultations and continue to gather resident’s views through the Citizens Panel. In 2026/27 we will deliver on the ambitions of the Strategic
Planning and Performance Framework and support the Council budget consultation 2027/28. 
Strategic Planning - 2027-2032
In line with the Council’s approach to strategic planning, work will begin in 2026/27 to identify key priorities for the next five years based on
findings from the Strategic Needs Assessment (SNA). The Strategic Needs Assessment is a high-level document and a precursor to the
engagement with key stakeholders to develop the new Strategic Plan which will set the vision and direction for Council services over the five-
year period of 2027-2032. In 2026/27, we will deliver on the ambitions of the Strategic Planning and Performance Framework and we will
progress the development of the Strategic Plan 2027-32.   
Reduce Performance & Strategy Team Resource
The savings options agreed to deliver the 2026/27 budget have resulted in a resource reduction in the Performance and Strategy team. 
The P&S team is responsible for the Council’s core performance management, strategic planning, public performance reporting, benchmarking,
consultation, equality duties and data analysis. The team enables the Council to meet key statutory obligations, including best value and Equality
Act requirements, and supports Audit Scotland reporting and funding compliance. With major work on the Strategic Plan 2027-32 required
beginning in 2026, reduced staffing will mean prioritising statutory duties, resulting in limited support for operational performance, continuous
improvement and delivery planning across services. In 2026/27 we will progress plans to implement the revised team and service provision. 
Continuous Improvement

Page 13

APPENDIX 2   
Continuous improvement is central to all that we do. The actions set out in this section, as well as those at an operational level not included in
this Delivery Plan, demonstrate our commitment to continuous improvement and take account of the wider Best Value focus on vision and
leadership; governance and accountability; effective use of resources; partnerships and collaborative working; working with communities;
sustainability and fairness and equality. 
Action Plan 
The challenges identified in Section 2 and the key factors identified in Section 3 have informed CCF priorities for 2026/27. Appendix 1 sets out
the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders
• strategic workforce actions to address workforce issues identified in the planning process; and 
• strategic and/or service risks. 
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership. Service risks relate to service delivery and represent the potential for impact on individual
services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service users and
clients in receipt of the services provided. In identifying the relevant risks for 2026/27 and actions to mitigate them, the aim is to improve or
maintain the current position (i.e. the current risk score) set out in the appendix. 
4. Resources 
Finance 
Citizen, Culture and Facilities has a revenue budget of £16.630m and no capital budget in 2026/27. A breakdown by service area is set out
below. We will make the best use of the resources available to deliver on key priority areas and secure external/match funding where this is
possible. 
Service Area Gross Expenditure
2026/27 (£m)
Gross Income
2026/27 (£m)
Net Expenditure
2026/27 (£m)
Capital Budget
2026/27 (£m)

Page 14

APPENDIX 2   
Performance & Strategy 0.266   -    0.266  0
Communications and Marketing 0.323  -0.022  0.301  0
Citizen Service 1.770  -0.221  1.549  0
Libraries 2.043  -0.011  2.032  0
Arts and Heritage 0.303  -0.060  0.243  0
Clydebank Town Hall 0.513  -0.170  0.343  0
Facilities Management 0.677          - 0.677  0
Building Cleaning  2.552  -0.262  2.290  0
Building Cleaning - PPP 1.104  -1.105  0 0
Facilities Assistants 2.903  -0.066  2.837  0
Events 0.113  -0.093  0.020  0
Catering Services 6.953  -0.958  5.994  0
School Crossing Patrollers 0.074   -    0.075  0
Total 19.601 -2.970 16.630 0 
Employees 
Employee Numbers
The headcount and full-time equivalent staff in each service area (as of 31st March 2026) are as follows: 
Service Area Headcount FTE
Communications & Sales 5 5
Customer Services 39 32.4
Facilities Management (Including Town Hall) 564 358
Libraries 58 37.4
Arts & Heritage 4 3.5
Performance & Strategy  4 3.6

Page 15

APPENDIX 2   
Absence in 2025/26 
The quarterly absence statistics for Citizen, Culture and Facilities are shown below together with the Council average for the same periods for
comparison. The figures have been higher than the Council average for 2025/26: 
Absence in 2025/26 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per
FTE employee
Citizen, Culture and Facilities  8.78% 6.53% 9.47% 9.94% 20.34
COUNCIL WIDE TOTAL 6.17% 5.39% 7.2% 7.65% 14.38  
TOTAL 674 439.9

Page 16

APPENDIX 2   
Appendix 1: Action Plan   
1. Our Communities   
Objective 2. Our residents health and wellbeing remains a priority 
Performance Indicator Target 26-27 Owner
% of pupil medical dietary requests met  100% Sharon Jump
% of pupils who take up free school meals (P1-7) 75% Sharon Jump
Number of attendances per 1,000 population for indoor sports and leisure facilities 6200 John Anderson 
Action Due Date Owner
Participate in the Council wide Good Food Nation Plan 31-Mar-2027 Sharon Jump 
Objective 3. Our residents are supported to increase life and learning skills 
Performance Indicator Target 26-27 Owner
Total number of visits to funded and part funded museums and heritage centres (in person & virtual)  106,500 Lauren Crooks
% of adults satisfied with museums and galleries 80% Lauren Crooks
Total number of library visits (physical and virtual)  552,000 Stephen Daly
Total number of library issues (physical and e-issues) 220,000 Stephen Daly
% of adults satisfied with libraries 75% Stephen Daly

Page 17

APPENDIX 2   
Action Due Date Owner
Plan and agree heritage activity programme for Glencairn House 31-Mar-2027 Lauren Crooks
Progress next phase of planning for future decant of WDC collections to Strathleven  31-Mar-2027 Lauren Crooks
Launch public access to local history and archive collections  31-Mar-2027 Lauren Crooks
Open dialogue with Creative Scotland to establish a Culture Collective for West Dunbartonshire 31-Mar-2027 Lauren Crooks
Progress and gain re-accreditation for Clydebank Museum  31-Mar-2027 Lauren Crooks
Embed new Libraries strategy. 31-Mar-2027 Stephen Daly
Contribute to the planning, decant and relocation of Library Services to Strathleven Pl  31-Mar-2027 Stephen Daly
Launch Glencairn House programme of Library activities. 31-Mar-2027 Stephen Daly
Provide recommendations following Library Services consultation 31-Mar-2027 Stephen Daly
Prepare for assessment under National Libraries Service Framework 31-Mar-2027 Stephen Daly 
4. Our Council 
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents 
Action Due Date Owner
Workforce Planning; Develop and implement wellbeing, employee engagement, equality and learning and
development plans to enable capabilities, improve resilience and promotion of a diverse workforce 31-Mar-2027 All Managers 
Workforce Planning; Develop and implement employee life cycle plans in line with the People First Strategy
to attract and retain the workforce.
31-Mar-2027 All Managers
Workforce Planning; Implement service review process including role design, use of new technology and
new ways of working to add resilience, address gaps, and establish opportunities for efficiencies
31-Mar-2027 All Managers

Page 18

APPENDIX 2 
Action Due Date Owner
Workforce Planning; Develop and implement learning and development opportunities to improve capabilities
and resilience within the workforce.
31-Mar-2027 All Managers 
Objective 11. Our Council is adaptable and focused on delivering best value for our residents 
Performance Indicator Target 26-27 Owner
% of complaints received by the Council that are resolved at Stage 1 90% Stephen Daly
% of complaints received by the Council that are resolved at Stage 2 10% Stephen Daly
% of telephone calls answered within 3 minutes by Contact Centre as a proportion of all calls answered. 90% Stephen Daly
% of telephone calls answered within 5 minutes by Repairs Contact Centre as a proportion of all calls
answered.
90% Stephen Daly
Residents satisfaction with Council services overall 70% Lauren Crooks 
Action Due Date Owner
Embed new Contact Centre telephony platform. 31-Mar-2027 Stephen Daly
Implement Contact Centre revised team and service provision 31-Mar-2027 Stephen Daly
Following Facilities Management service redesign, embed new ways of working   31-Mar-2027 Sharon Jump
Consider the options to develop an FM training academy and apprentice programme  31-Mar-2027 Sharon Jump
Implement Performance & Strategy revised team and service provision 31-Mar-2027 Lauren Crooks
Adjust West Dunbartonshire Leisure Trust management fee 31-Mar-2027 Amanda Graham

Page 19

APPENDIX 2   
Risk Description Current Assessment Target Assessment Owner
Risk of failure to meet
citizen expectation and
service standards
Risk of citizen dissatisfaction due to us not doing what
we say we will when we say we will.  Stephen Daly
Failure to effectively
manage and learn from
complaints
There is a risk of damage to the Council's reputation.
If complaints are not handled effectively, there can be
an adverse effect on the public perception of the
Council which can lead to a lack of trust in the
services provided.   
Stephen Daly 
Objective 12. Our residents are engaged and empowered 
Performance Indicator Target 26-27 Owner
% of residents who are satisfied with the Council website 80% Stephen Daly
% of stage 1 complaints responded to within 5 working days. 100% Stephen Daly
% of stage 2 complaints responded to within 20 working days. 100% Stephen Daly
No. of transactions undertaken online 59,000 Stephen Daly
% of residents who feel the Council communicates well with them 60% Lauren Crooks 
Action Due Date Owner
Upgrade Content Management System 31-Mar-2027 Stephen Daly
Review website accessibility to ensure it complies with regulations 31-Mar-2027 Stephen Daly

Page 20

APPENDIX 2   
Action Due Date Owner
Progress plan to enhance intranet accessibility 31-Mar-2027 Stephen Daly
Develop a communication plan to support budget savings initiatives for 26/27 31-Mar-2027 Lauren Crooks
Prepare a communications plan to support service changes 31-Mar-2027 Lauren Crooks
Support the West Dunbartonshire budget consultation for 27/28 31-Mar-2027 Lauren Crooks
Deliver on the ambitions of the Strategic Planning and Performance Framework 31-Mar-2027 Lauren Crooks
Progress the development of the Strategic Plan 2027-32  31-Mar-2027 Lauren Crooks 
Risk Description  Current Assessment Target Assessment Owner
Risk of Ineffective
Communications /
Reputation Risk
Ineffective use of corporate communication channels
may result in messages that are inconsistent with
authorised responsibilities or established performance
measures. Employees without intranet access or
email access may not receive communications. Not
effectively managing corporate responses to adverse
events may lead to an erosion of the Council's
reputation.  