Appendix 1: Citizen Culture & Facilities Delivery Plan 2025/26 -Mid Year Progress
1. Our Communities
Objective 2. Our resident’s health and wellbeing remain a priority
Q1 2025/26 Q2 2025/26
Performance Indicator
Status Value Target Status Value Target Short
Trend
Long
Trend Note
Owner
Number of attendances per
1,000 population for indoor
sports and leisure facilities
1,747 1,500 1,683 1,659
Target exceeded in both quarters. Dryside attendances increased
compared to the previous year. Clydebank Leisure Centre,
Meadow, and the Vale Pool recorded a rise. Most increases
occurred within the health and fitness areas. Clydebank Leisure
Centre hosted dancing and sports events during this period.
John Anderson
% of pupil medical dietary
requests met 100% 100% 100% 100% Target achieved. Sharon Jump
% of pupils who take up free
school meals (P1-7) 68% 75% 87% 75% Q1 target marginally missed however Q2 target exceeded.
Performance tracking to continue to meet target. Sharon Jump
Action Status Progress Due Date Note Owner
Participate in the Council wide Good Food Plan 31-Mar-2026
Action progressing as planned. We continue to engage with
external stakeholders/network to identify opportunities in
preparation for the development of plans.
Sharon Jump
Ensure appropriate free school meal provision is in
place 31-Mar-2026
Action progressing as planned. We are engaging with colleagues in
Education and across Revenue and Benefits service to ensure the
relevant date is being shared timeously and all pupils who qualify
for free school meals are identified.
Sharon Jump

Page 2

2
Objective 3. Our residents are supported to increase life and learning skills
Q1 2025/26 Q2 2025/26
Performance Indicator
Status Value Target Status Value Target Short
Trend
Long
Trend Note
Owner
Total number of library issues
(Physical and e-Issues) 54,797 55,000 60,159 55,000 Performance tracking to meet target. Q1 target marginally missed
however Q2 target exceeded. Emma Eremin
Total number of visits to
museums and heritage centres
(virtual & in person) *
25,356 26,625 29,003 26,625 Performance tracking to meet target. Q1 target marginally missed
however Q2 target exceeded. Lauren Crooks
Total number of library visits
(physical and virtual) 157,136 96,249 172,181 96,249
Performance tracking to meet or exceed target. Strong Q1 and Q2
exceeding 2024-25 for same period.  Virtual visits increasing due to
new Library management system reporting more accurately on
visitors to online library catalogue.
Emma Eremin
H1 2025/26
Performance Indicator
Status Value Target Short
Trend
Long
Trend Note
Owner
% Residents satisfied with
Libraries 76% 75%
Target met. Of the 75 residents who responded, 57 were satisfied with the service and 18
indicated dissatisfaction. Comments include dissatisfaction with closure of local libraries and
relocation of libraries.
The Councils Citizens Panel is the new source for satisfaction measures following the removal of
the telephone survey as part of 24/25 budget savings. This change has resulted in a reduction
to the base numbers of respondents.
Emma
Eremin
% Satisfaction with museums &
galleries 79% 80%
Performance marginally missed target and down by 2% from year end. Of the 47 residents who
responded to this question, 37 were satisfied with the service and 10 indicated dissatisfaction.
Comments include lack of knowledge of where the museums and galleries are located and what
is on.
As the data source is now the Citizens Panel, there is a reduction to the base numbers of
respondents. With the base numbers being smaller fluctuations in satisfaction levels are
expected. It is anticipated the year end will show a more representative result. In addition,
progress of Glencairn, Clydebank Heritage hub and conversion of Dumbarton library should
support improved satisfaction.
Lauren
Crooks

Page 3

3
Action Status Progress Due Date Note Owner
Progress funding application to support heritage
activity programme for Glencairn House 31-Mar-2026
Action progressing as planned. We continue to work closely with our
asset’s colleagues regarding the timeline for the opening of
Glencairn House. Work on the activity programme for Glencairn
House is ongoing in the Arts & Heritage team. The split between
collections, local history and arts development provision is being
finalised and funding streams will be pursued as this is completed.
Lauren
Crooks
Prepare for opening of new Clydebank Museum and
Launch Heritage Programme 31-Mar-2026
Clydebank Museum and Local History & Archives is now successfully
open to the public and the Museums Galleries Scotland (MGS)
funded Heritage Project Worker is now in post. The activity
programme is now underway, and engagement has been strong to
date.
Lauren
Crooks
Progress next phase of planning for future decant of
WDC collections to Strathleven 31-Mar-2026
Action progressing as planned. List of requirements complete and
available for next stage. We continue to work with colleagues in
Asset Management as the Capital project plan progresses. The
mapping exercise for collections will take place alongside this
progression.  
Lauren
Crooks
Launch public access to local history and archive
collections 31-Mar-2026
Server and Modes updates are now complete. There has been
further delay in catalogue records being uploaded to Modes due to
the size of the digital files, this is being mitigated by moving to
batch uploads which should mean the collections data required for
the online platform to go live to the public should be in place
imminently.
Lauren
Crooks
Develop the co-located Faifley Community Library and
embed into branch network 31-Mar-2026
Action progressing as planned.  We are working with our Assets
colleagues on the scheduled move plan.  Faifley library is scheduled
to close to the public on 15th October to decant and move location.
Faifley library will reopen on 22nd October in line with whole
campus.  Opening hours will remain as currently 2-5pm Monday-
Friday and will be reviewed in line with citizen feedback as the
library settles in its new location.
Emma
Eremin
Relocate Dumbarton Library to Glencairn House with
new staffing model in place. 31-Mar-2026
Action progressing as planned.  Library Services continue to
contribute to decant plans for the move of Dumbarton Library to
Glencairn House.  We continue to work closely with our asset’s
colleagues regarding the timeline for the move to take place.  We
anticipate a closure of 3 weeks to allow the move to take place.  The
mobile library will offer library book borrowing services outside
Dumbarton Library to ensure a library service continues for citizens
throughout the move period. Anticipated staffing and operational
plans for Glencairn have been shared with managers.
Emma
Eremin

Page 4

4
Action Status Progress Due Date Note Owner
Create a strategy document for West Dunbartonshire
Libraries 31-Mar-2026
Action progressing as planned. Following public consultation 98% of
respondents see libraries as vital to their community's future. The
consultation feedback highlighted 5 priorities for the service to
deliver; 1. Discovering new books, 2. Enjoying a Calm, welcoming
space, 3. Having lots of resources in one place, 4. Getting helpful
advice from staff, 5. Joining in a range of activities and classes. 
These priorities have informed the 4 drafted Strategic Aims. 
1: Reading and Learning,
2: Fostering Community Wellbeing,
3: Empowering Connections,
4: Sustainable Development and Innovation. 
The Library Strategy will demonstrate how the service fits into the
Council Strategic Plan 2022-27 and Forward: National Strategy for
Public Libraries. The strategy gives a commitment that the service
will undergo self-evaluation and peer evaluation through the Scottish
Library and Information Council How Good is Our Public Library
Framework.    
Emma
Eremin
Develop and deliver the Libraries Empower
Connections Digital Offering 31-Mar-2026
Action progressing as planned. Tablet devices have been procured
along with an interactive screen within Clydebank Library. Activities
began with drop-in sessions for citizens to seek advice on accessing
online council services. The project then pivoted when a need was
identified and highlighted via the Performance and Strategy Team
regarding the need for digital assistance for deaf people in accessing
council services. A successful scoping meeting was held with the
group with the project funding BSL Interpreters.  The group were
not previously aware of library services and the digital
services/classes on offer or how to access council services online.
The entire group joined the library at the session to be able to
access services. A programme has been developed for the group to
support the use of devices to access library and other online services
which will run in November. The British Deaf Association highlighted
this as the first digital programme specifically for deaf people in
Scotland tackling digital exclusion.
Emma
Eremin
Contribute to Planning, Decant and Relocation of
Library Services from Poplar Road. 31-Mar-2026
Action progressing as planned. Libraries will continue to contribute
to planning and requirements in line with Asset Management
timetable for move.  This action will follow the move of Dumbarton
Library to Glencairn House.  Outline of requirements shared with
managers including the required move of the Mobile Library service,
Home Delivery service, Bookbug Bag storage and distribution point
and Library HQ Support and Learning Services staff. 
Emma
Eremin

Page 5

5
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Status Progress Due Date Note Owner
Workforce planning; Develop and implement
wellbeing, employee engagement, equality and
learning and development plans to enable capabilities,
improve resilience and promotion of a diverse
workforce
31-Mar-2026
Action progressing. Investigating technology options with Council data
analyst to deliver improved absence and leave planning in contact
centre alongside market research. Facilities management has
implemented ongoing engagement as part of service redesign and will
have a further staff survey following implementation of the new
service model.
Amanda
Graham
Workforce planning; Implement service review
process including role design, use of new technology
and new ways of working to add resilience, address
gaps, and establish opportunities for efficiencies
31-Mar-2026
Action progressing. Within Libraries preparation underway to consider
work required to review and develop role profiles for Library staff,
where there are no current profiles. Role profile for front lime staff
amended. Within Arts and Heritage work is underway to consider the
delivery of savings, likely to require change in roles or structure of the
team consideration will be given to Standard Operating Model (SOM)
compliance. Within Facilities Management the new service model plans
will provide appropriate resilience.
Amanda
Graham
Workforce planning; Develop and implement
learning and development opportunities to improve
capabilities and resilience within the workforce.
31-Mar-2026
Action progressing. Performance is being proactively managed with
Facilities Management. The actions being implemented by
management team will continue. Telephone performance reviewed and
reported to PMRG Sept 25. The service will continue to monitor and
report as required. Forum of CCF senior managers to share best
practice is in place with regular diarised meetings.
Amanda
Graham
Objective 11. Our Council is adaptable and focused on delivering best value for our residents

Page 6

6
Q1 2025/26 Q2 2025/26
Performance Indicator
Status Value Target Status Value Target Short
Trend
Long
Trend Note
Owner
Percentage of complaints received
by the Council that are resolved/
closed at Stage 1
79% 90% 70% 90%
Q1 target marginally missed and Q2 target missed. In the
first six month there were 574 complaints received. In the
reporting period 488 were handled at Stage 1 and of these
430 complaints were closed or resolved at this stage. The
remaining 59 complaints will be closed and reported within
the appropriate reporting period.  Increased workload and
complexity have meant more complaints being escalated
from Stage 1.
Stephen
Daly
Percentage of complaints received
by the Council that are resolved at
Stage 2
10% 10% 12% 10%
Q1 target met and Q2 target missed.  In the period April-
September 2025 there were 574 complaints received. Of
these 61 were handled at Stage 2. Of the stage 2 complaints
received 33 were responded to in Q2. The remaining 28
open complaints will be closed and reported within the
appropriate reporting period. Increased workload and
complexity has meant more complaints being escalated from
Stage 1.
Stephen
Daly
% of telephone calls answered
within 5 minutes by Repairs
Contact Centre as a proportion of
all calls answered.
92% 90% 90% 90% Q1 target exceeded and Q2 target met. With over 18,650
calls, 17,857 were answered within 5 minutes.
Stephen
Daly
% of telephone calls answered
within 3 minutes by Contact Centre
as a proportion of all calls
answered.
79% 90% 89% 90%
Target marginally missed in both quarters. More than
13,099 calls received. Of these 10,995 calls answered within
3 minutes. A further 1832 were answered after 3 minutes. 
Reduced resourcing and increased call volume relating to
various issues alongside increased call handle time due to
increased complexity in calls received together contributed
to reduced performance.
Stephen
Daly
H1 2025/26
Performance Indicator
Status Value Target Short
Trend
Long
Trend Note
Owner
Residents satisfaction with Council
services overall 49% 70%
Target significantly missed with downward trend from previous year. Of the 129 Citizens
panel members who responded to the online survey, 63 were satisfied with the service
and 66 indicated dissatisfaction. Comments include dissatisfaction with the service
provided by a number of services across the Council, the poor condition of the local
environment, and high cost of Council tax with reduced services.
The Councils Citizens Panel is the new source for satisfaction measures. This change has
resulted in a reduction to the base numbers of respondents. With the base numbers being
Lauren
Crooks

Page 7

7
H1 2025/26
Performance Indicator
Status Value Target Short
Trend
Long
Trend Note
Owner
smaller fluctuations in satisfaction levels are expected. It is anticipated the year end will
show a more representative result. 
Action Status Progress Due Date Note Owner
Support upgrade to Contact Centre Telephony Platform 31-Mar-2026
Action progressing as planned. Essential requirements for Contact
Centre have been established and discussed with ICT. ICT are
continuing to have discussions with potential suppliers to further their
investigations into upgrade to the corporate telephone system.
Stephen
Daly
Facilities Management Service Redesign 31-Mar-2026
Action progressing as planned. We are finalising a review of all data
from 1:1’s which will feed into the overall matching process to assist
in the conclusion of the Service Re-Design.
Sharon
Jump
Consider the options to develop an FM training
academy and apprentice programme 31-Mar-2026
Action progressing as planned.  Discussions have taken place with
W4U and Education to identify options for development of
apprenticeship opportunities. Dates are to be confirmed for
participation at Careers evenings and further engagement with
Secondary Head Teachers and W4U is ongoing.
Sharon
Jump
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Risk of Failure to meet
citizen expectation and
service standards
Risk of citizen dissatisfaction due to us
not doing what we say we will when we
say we will.
06-Oct-2025
Demand to the Contact Centre continues to
become more complex and outcomes to satisfy
the Citizens are much harder to achieve. This
is also visible on social media. Evidence to
support this is the challenging situations on
Waste Services, Conditions of Roads, speed of
response to Housing enquiries, ongoing
concerns to Housing Repair updates being the
most significant number of calls to the Council.
Citizens are dissatisfied as indicated in
satisfaction surveys.
No change to risk matrix
Stephen
Daly

Page 8

8
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Failure to effectively manage
and learn from complaints
There is a risk of damage to the
Council's reputation. If complaints are
not handled effectively, there can be an
adverse effect on the public perception
of the Council which can lead to a lack of
trust in the services provided.
01-Oct-2025
Work continues to engage with services and
improve response times and learning
outcomes.
The likelihood remains the same in terms of no
new evidence being visible on how Services
have improved their processes by learning
from complaints.
No change to risk matrix
Stephen
Daly
Objective 12. Our residents are engaged and empowered
Q1 2025/26 Q2 2025/26
Performance Indicator
Status Value Target Status Value Target Short
Trend
Long
Trend Note
Owner
% of stage 1 complaints responded
to within 5 working days. 68.92% 100% 60.11% 100%
Target missed in both quarters.  In the 6-month period
April - September there were 430 complaints
responded to Stage 1.  Of these 280 complaints were
responded to within 5 working days.  A further 93
stage 1 complaints were closed with extensions being
applied.  Delays were due to increased workload and
delays in responses from services.
Stephen Daly
% of stage 2 complaints responded
to within 20 working days. 61.29% 100% 46.66% 100%
Target missed in both quarters. In the 6-month period
April - September 2025 there were 86 complaints
handled at Stage 2. Of these 61 complaints were
closed at stage 2 of which 33 were responded to within
20 working days. A further 7 were closed with
extension being applied. Delays in responses are due
to the complexity of matters raised and also delays in
responses being received from services.
Stephen Daly
No. of transactions undertaken
online 17,858 17,000 14,659 14,000
Targets exceeded. Targets were increased for 2025/26
based on increased on line transactions including
garden waste fees, full first year and West
Stephen Daly

Page 9

9
Q1 2025/26 Q2 2025/26
Performance Indicator
Status Value Target Status Value Target Short
Trend
Long
Trend Note
Owner
Dunbartonshire Leisure Trust (WDLT) now using its
own payment system.
H1 2025/26
Performance Indicator
Status Value Target Short
Trend
Long
Trend Note
Owner
Percentage of residents who are
satisfied with the Council website 81% 85%
Performance marginally missed target and down by 3.2% from year end. Of the 105
residents who responded to this question, 85 were satisfied with the service and 20
indicated dissatisfaction. Comments include; difficulty navigating and finding required
information and slow or no response to online enquiries. These enquiries are managed by
each service area rather than the Web team. 
With the base numbers being smaller now we are using the Citizens Panel, fluctuations in
satisfaction levels are expected. It is anticipated the year end will show a more
representative result.
Stephen Daly
% of residents who feel the
Council communicates well with
them and keeps people informed
of important information.
46% 60%
Performance has reduced from year end although has been trending in red status for some
time. Of the 105 residents who responded, 48 were satisfied with the service and 57
indicated dissatisfaction. Comments include too much emphasis on social media for
communication, concern that key messages and information on various services is not
always in good time.
With the base numbers being smaller now we are using the Citizens Panel, fluctuations in
satisfaction levels are expected. It is anticipated the year end will show a more
representative result.
Lauren Crooks
Action Status Progress Due Date Note Owner
Implement Arts and Heritage revised team and service
provision 31-Mar-2026
Action progressing as planned. Meeting with the Arts and Heritage
team have taken place. A review of the current team structure
including role profile and tasks has been undertaken and the draft
proposal for service provision has been prepared. The next step is to
take this proposal to SRRG to seek approval for consultation.  
Lauren
Crooks
Review website coding to ensure it complies with
regulations 31-Mar-2026
Action progressing as planned. We successfully improved our Silktide
accessibility score from 70% to 81% by implementing WCAG 'A' level
coding fixes across the site. The small number of new 'A' issues
flagged are related to the recent Chatbot integration; the supplier is
currently working on resolution and aims to have them resolved early
Q3.
Stephen
Daly

Page 10

10
Action Status Progress Due Date Note Owner
Progress plan to enhance intranet accessibility 31-Mar-2026
Action on internal site improvements is ongoing. While priority
remains on the external site, we are resolving quick, easy-to-fix issues
on the intranet. However, because we do not directly control daily
content, new issues are frequently introduced by editors at the same
time we are resolving old ones. We will continue to monitor the
intranet content
Stephen
Daly
Review website accessibility to ensure it complies with
regulations 31-Mar-2026
Action is progressing as planned. We have successfully fixed all WCAG
'A' criteria issues on the external website (excluding known issues
related to third-party integrations like Google Maps), meeting the
minimum level of conformance. Our next focus is the higher-level 'AA'
criteria issues. We will prioritise fixing individual page issues first,
before addressing those that impact the overall look and feel of the
website
Stephen
Daly
Implement Contact Centre revised team and service
provision 31-Mar-2026
Action progressing as planned. Saving delivered, revised team and
service provision complete. We will continue to monitor impact on
service.
Stephen
Daly
Develop a communication plan to support budget
savings initiatives for 25/26 31-Mar-2026
Action progressing as planned, communications approach and timeline
has been agreed. Development of draft communication plan for
December budget is underway.
Lauren
Crooks
Carry out Strategic Needs Assessment to support
Strategic Plan 2027-2032 & LOIP 2027-2037 31-Mar-2026
This action is progressing well and on track to be completed by year
end. To detailed analysis is being compiled to give an overview of the
current and future needs of the local community to identify priority
areas of focus to reduce inequalities. The strategic needs assessment
will form the basis of future work to be undertaken in development of
the Council Strategic plan 2027-2032 and the Local outcome
improvement plan 2027-2037.
Nicola
Docherty
Identify underrepresented groups and implement
actions to encourage better strategic engagement and
participation
31-Mar-2026
This action is progressing well and on track to be completed by year
end. To date we have engaged with underrepresented groups around
the budget consultation ensuring a range of groups had the
opportunity to have their views reflected. BSL users met with the
Libraries and Arts & heritage team to discuss accessing cultural and
library activities and digital classes and as a result dedicated digital
classes are due to take place over the coming months to support BSL
users getting online to access key council services as well as building
general digital confidence. Through our engagement with young
people during the budget conversation, they have indicated they
would be interested in forming a dedicated young person’s Citizens
Panel and work will continue throughout the remaining year to design
and host our first young person’s panel. 
Nicola
Docherty
Carry out strategic engagement to support budget
consultation 2026/27 31-Mar-2026 This action has been successfully completed. To support the Council
budget consultation for 2026/27, a priority-based survey was
Nicola
Docherty

Page 11

11
Action Status Progress Due Date Note Owner
conducted with the general population of West Dunbartonshire, and
eight focus groups were carried out with a range of community
organisations, young people and equality groups. The findings were
presented to Council on 29th October to assist Chief officers and
Elected members understand the community priorities.
Develop Equalities Outcomes and Mainstreaming Plan
2025-29 31-Mar-2026
This action has been successfully completed. The new Equalities Plan
25-29 has been developed and now published as per our duties. The
ensuing action plan will be progressed over the 4 years of the plan and
reported to committee at biannual intervals.
Nicola
Docherty
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Risk of Ineffective
Communications /
Reputation Risk
Ineffective use of corporate
communication channels may result in
messages that are inconsistent with
authorised responsibilities or established
performance measures. Employees
without intranet access or email access
may not receive communications. Not
effectively managing corporate
responses to adverse events may lead to
an erosion of the Council's reputation.
06-Oct-2025
A number of processes and strategies are in
place to ensure both internal and external
communication is effective and protects the
Council's reputation.
There is no change to risk matrix
Lauren
Crooks
Action Status
Overdue
Not on track
In Progress and on track
Completed
PI Status
Target significantly missed
Long Term Trends
Improving
Short Term Trends
Improving

Page 12

12
Target narrowly missed
Target met or exceeded
No change
Declining
No change
Declining