Agenda
Community Planning West
Dunbartonshire Management Board
Date:  Wednesday, 28 September 2022
___________________________________________________________________
Time:  14:00
___________________________________________________________________
Format:  MS Teams
___________________________________________________________________
Contact:   Ashley MacIntyre, Committee Officer
ashley.macintyre@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Community Planning West Dunbartonshire
Management Board as detailed above. The business is shown on the attached
agenda.
Yours faithfully
PETER HESSETT
Chief Executive
WEST DUNBARTONSHIRE COUNCIL
Council Offices, 16 Church Street, Dumbarton G82 1QL
Page 1

Page 2

Distribution:
Councillor Martin Rooney (Chair)
Councillor Michelle McGinty
Councillor Craig Edward
Peter Hessett, Chief Executive, West Dunbartonshire Council 
Beth Culshaw, Chief Officer of West Dunbartonshire Health and Social Care   
Partnership (WD HSCP)
Laura Mason, Chief Education Officer, West Dunbartonshire Council
Peter Barry, Chief Officer – Housing and Employability, West Dunbartonshire
Council
Fiona Taylor, Health and Social Care Partnership (WD HSCP)
John Anderson, Manager, West Dunbartonshire Leisure Trust
Liz Connolly, Principal, West College Scotland
Elizabeth Dean, Department of Works and Pensions 
Lorna Gibson, Superintendent, Police Scotland
Jimmy Hyslop, Operations Manager, Scottish Natural Heritage
Sharon Kelly, Head of West Region, Skills Development Scotland
Bruce Kiloh, Principal Transport Policy Officer, Strathclyde Partnership for  Transport
Anne MacDougall, Chair of the Community Alliance
Joe McKay, Local Senior Officer – West Dunbartonshire, Scottish Fire & 
Rescue Service 
Mark Newlands, Scottish Enterprise
Kevin Quinlan, Scottish Government Location Director
Selina Ross, Manager, West Dunbartonshire Community Volunteering Service
Damon Scott, Dunbartonshire Chamber of Commerce
Noreen Shields, Nursing Director, NHS Greater Glasgow and Clyde
Catherine Topley, Chief Executive, Scottish Canals
Gordon Watson, Loch Lomond & the Trossachs National Park
Gerry Watt, Scottish Prison Service
Amanda Graham, Chief Officer, Citizens, Culture, & Facilities
Rona Gold, Community Planning Manager (Shared Service)
Provost Douglas McAllister [substitute]
Councillor John Millar [substitute]
Councillor Gurpreet Singh Johal [substitute]
Date of Issue: 15 September 2022
Page 2

Page 3

COMMUNITY PLANNING WEST DUNBARTONSHIRE MANAGEMENT BOARD
WEDNESDAY, 28 SEPTEMBER 2022
AGENDA
1 WELCOME
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items
of business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Board is asked to agree that all votes taken during the meeting be
done by roll call vote to ensure an accurate record.
5 MINUTES OF PREVIOUS MEETING  5 - 7
Submit for approval as a correct record, the Minutes of Meeting of the
Community Planning West Dunbartonshire Management Board held on 21
June 2022.
6 ACTION LOG  9
Rona Gold, report author.
7 MEMBERS OF THE SCOTTISH YOUTH PARLIAMENT Verbal
(MYSPs)
Members of the Scottish Youth Parliament (MYSPs), pre-recorded video
update.
8 DYW WEST PRESENTATION Verbal
Bob Davidson, verbal update.
Page 3

Page 4

9 CONSULTATION ON STRATEGIC PLAN Verbal
Rona Gold, verbal update.
10 COMMUNITY PLANNING EXECUTIVE GROUP 11 - 13
Peter Hessett, report author.
11 COMMUNITY JUSTICE PARTNERSHIP UPDATE     To Follow
Beth Culshaw, report author.
12 JOINT CHILDREN SERVICES ACTION PLAN     To Follow
Beth Culshaw, report author.
13 DELIVERY IMPROVEMENT GROUP (DIG) UPDATES
(a) Flourishing – Peter Barry 15 - 21
(b) Independent – Fiona Taylor 23 - 25
(c) Nurtured – Laura Mason 27 - 29
(d) Empowered – Selina Ross 31 - 34
(e) SAFE – Lorna Gibson 35 - 38
Page 4

Page 5

COMMUNITY PLANNING WEST DUNBARTONSHIRE MANAGEMENT BOARD
Tuesday, 21 June 2022
Present:
Councillor Martin Rooney (Chair) West Dunbartonshire Council
Councillor Michelle McGinty West Dunbartonshire Council
Councillor Craig Edward  West Dunbartonshire Council
Joyce White   West Dunbartonshire Council
Amanda Graham  West Dunbartonshire Council
Laura Mason   West Dunbartonshire Council
Peter Barry   West Dunbartonshire Council
Lesley James West Dunbartonshire Health and
Social Care Partnership
Fiona Taylor West Dunbartonshire Health and
Social Care Partnership
John Binning  Strathclyde Partnership for
Transport
Gordon Boyle Scottish Fire and Rescue
Liz Connolly   West College Scotland 
Lucy Dunbar   Argyll & Bute Council
Jimmy Hyslop Nature Scot
Sharon Kelly   Skills Development Scotland 
Janice Kennedy Scottish Enterprise
Joe McKay   Scottish Fire and Rescue
Paula Potter   Department for Work and Pensions
Damon Scott   Dunbartonshire Chamber of
Commerce
Coleen Wylie   Police Scotland
Apologies:
Beth Culshaw West Dunbartonshire Health and
Social Care Partnership
Rona Gold Shared Service, Community 
Planning, Argyll & Bute Council
Anne McDougall Chair of Community Alliance
(Vice-Chair)
Barry Colvan   Scottish Fire and Rescue
Catherine Topley Scottish Canals
Selina Ross   West Dunbartonshire CVS
James Russell Skills Development Scotland
Gerry Watt   Scottish Prison Service
Mark Wilson   Police Scotland
Councillor Martin Rooney in the Chair
ITEM 5
Page 5

Page 6

STATEMENT BY CHAIR
Councillor Martin Rooney, Chair, welcomed everyone to the June meeting of the
Community Planning West Dunbartonshire Management Board.
Councillor Rooney informed the Board that this was the last meeting which Joyce
White, Chief Executive would attend before her retirement. On behalf of the Board,
Councillor Rooney thanked Joyce for her work and diligence as interim Chair, leading
the Executive Group and for her support, dedication and commitment over the years. 
Other Members of the Board were heard in similar terms and wished Joyce well in her
retirement. 
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of business
on the agenda.
RECORDING OF VOTES
The Board agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Community Planning West Dunbartonshire Management
Board held on 3 February 2022 were submitted and approved as a correct record.
ACTION LOG
After discussion and having heard from the Chief Officer – Citizen, Culture and
Facilities, the Board agreed the action log would be updated to reflect additional actions
following the meeting.
COMMUNITY PLANNING EXECUTIVE GROUP
After discussion and having heard the Chief Executive in further explanation and in
answer to Members’ questions, the Board agreed:-
(1) to note that levelling up synergies with Flourishing DIG would be considered;
(2) to note that Laura Mason would be Exec Group lead and CPWD lead reporting
on implications from Children’s Services perspective and Fiona Taylor from an
Adult Services perspective on the National Care Service proposals; and
Page 6

Page 7

(3) to note that a Community Planning ‘Communications, e-bulletin’ would be
produced from July 2022 including information on partner activity for members of
the CPWD Management Group and people within their organisations. 
COMMUNITY JUSTICE PARTNERSHIP UPDATE 
After discussion and having heard the Head of Children’s Health, Care and Justice
Services in further explanation and in answer to Members’ questions, the Board agreed
to note the report. 
SCOTLAND LOVES LOCAL: GIFT CARD SCHEME 
After discussion and having heard Damon Scott, Dunbartonshire Chamber of
Commerce in further explanation and in answer to Members’ questions, the Board
agreed to note the report. 
DELIVERY IMPROVEMENT GROUP (DIG) UPDATES 
(a) Flourishing – Peter Barry
(b) Independent – Fiona Taylor
(c) Nurtured – Laura Mason
(d) Empowered – Selina Ross
(e) SAFE – Coleen Wylie 
Having heard the relevant DIG Chairs and supporting officers in further explanation and
in answer to Members’ questions, the Board agreed to note the updates provided and
the position going forward in terms of each DIG area. 
The meeting closed at 12.05 p.m.
Page 7

Page 8

Page 8

Page 9

Complete In Progress Outstanding
Date Set Action Who Required by
Date
Status
21.06.2022 Invite West Dunbartonshire Members of the Scottish Youth Parliament
(MSYPs) to CPWD Board Meeting in 2022.
Rona Gold/
Clare English
November 2022 Complete
21.06.2022 Launch of E-Bulletin to share partnership news within the Community
Planning Management Board
Rona Gold/
Amanda
Graham
1 September
2022
Complete
21.06.2022 All members consider signing up to the Young Persons Guarantee All partners of
the Community
Planning
Management
Board
28 September
2022
In Progress
ITEM 6
Page 9

Page 10

Page 10

Page 11

Report by the Chief Executive Officer of West Dunbartonshire Council, Chair of
the Community Planning Executive Group
Management Group: 28 September 2022
___________________________________________________________________
Subject: Community Planning Executive Group
1. Purpose
1.1 The purpose of this report is to inform CPWD members of what was
discussed at the most recent Community Planning Executive Group meeting.
2. Recommendations
2.1      CPWD is asked to note:
• There has been a change to the chair of the Safer Development and
Improvement Group (DIG) as Coleen Wylie, Chief Inspector - Local Area
Commander, Police Scotland has moved post.
• Partnership working on Community Justice and on the Joint Children’s
Services Action Plan be regularly reported within Community Planning –
through either Executive Group or Management Board – to ensure oversight
and understanding of partners as to the requirements within these for
Community Planning.
• The annual report for Community Planning West Dunbartonshire 2021-22 is
being prepared and will come to the Management Board at its meeting in
November.
3. Background
3.1 The Community Planning Executive Group met on 15 August 2022. The group
is chaired by the Council’s Chief Executive, and membership includes the five
DIG leads.   
ITEM 10
Page 11

Page 12

4. Main Issues 
4.1 This was the first meeting chaired by the new Chief Executive of the Council:
Peter Hessett. It was also the first meeting of Ryan Mcmurdo of Police
Scotland, Ryan introduced himself as replacing Coleen Wylie of Police
Scotland and as the chair of the Safer Development and Improvement Group
(DIG). 
4.2 The three over-arching themes for each DIG plan are: Sustainability,
Wellbeing and Empowered. DIG plans have or are in process of being
reviewed to reference the three over-arching themes. Laura Mason, the DIG
Lead for ‘Nurtured’ reported that the three themes were considered at an
Education Leaders Conference on 17 June, and that they are integral to the
Nurtured DIG plan. 
4.3 It was recognised that the partnership working on Community Justice and on
the Joint Children’s Services Action Plan be regularly reported within
Community Planning – through either Executive Group or Management Board
– to ensure oversight and understanding of partners as to the requirements
within these for Community Planning. 
4.4 The Executive Group received an update from the Community Planning
Shared Service Manager that the e-bulletin for partners would be launched
from start September, and that work was underway to collate information for
the 2021/22 Community Planning West Dunbartonshire Annual Report. 
5. People Implications 
5.1 Actions developed to address the over-arching themes, Community Justice and
Joint Childrens Services Action Plan may require other partner organisations to
join specific working groups. 
6. Financial Implications 
6.1 The work of Community Planning Executive Group is focused on improving
processes and approaches to how partners work together. The creation of
actions may identify resource needs to implement these. 
7. Risk Analysis 
7.1 Failure to respond to challenges would risk delivery against policy priorities. 
8. Equalities Impact Assessment (EIA) 
8.1 No actions are required as this is an update report. 
9. Consultation
Page 12

Page 13

9.1 This report provides an update on ongoing activity.
10. Strategic Assessment
10.1  Progressing work as outlined in this report ensures CPWD can deliver on the
outcomes set in the Local Outcome Improvement Plan.
Peter Hessett. Chair, CPEG
02 September 2022
____________
Person to Contact: Rona Gold, Shared Service Community Planning Manager,
rona.gold@argyll-bute.gov.uk, 01436 658 862, 07780 00 4561
Appendices: N/A
Background Papers:  Previous reports to Community Planning West
Dunbartonshire Management Board on Executive Group
activity. 
Wards Affected: All
Page 13

Page 14

Page 14

Page 15

Subject:
Report by the Chief Officer - Housing and Employability
Management Group – September 2022
________________________________________________________
Flourishing DIG Update
1. Purpose
1.1 The purpose of this report is to update members on the
development and delivery of activity being undertaken under the
auspices of the Flourishing Delivery and Improvement Group
(DIG).
2. Recommendations
2.1 The Community Planning Partnership (CPP) Management Group
is asked to note the work undertaken.
3. Background
3.1 The Flourishing DIG action plan supports the local outcomes
ensuring: • Our economy is flourishing diverse and dynamic,
creating opportunities for everyone
• Our local communities are sustainable and attractive
• Increased and better quality learning & employment
opportunities
• Enhanced quality and availability of affordable housing
options
3.2  This report provides members with an update on the key activity
undertaken during the operational year to date.
4. Main Issues
4.1  The COVID Pandemic recovery and Cost of Living Crisis has
been the focus of the Flourishing Delivery and Improvement
Group (DIG) partners over the last period and will continue to be a
ITEM 13a
Page 15

Page 16

priority as we support our communities and businesses in
returning the local economy back into a growth phase.
4.2  The Flourishing DIG fully recognises the challenge of the climate
emergency and will ensure a clear focus on green jobs and a
green economic recovery to the COVID pandemic. The Council’s
Climate Change Action Plan can provide a foundation for
discussion and development of ideas amongst DIG partners in the
coming period.
4.3  The CPWD Executive Group agreed the key underpinning themes
that will inform our future work.  The three themes are
Sustainability, Wellbeing and community empowerment. The
Flourishing DIG will ensure that its action plan explicitly or
implicitly reflects these themes and ensure that all partners play
their role. 
5. Employability
5.1  Working4U and partners have been developing a new approach
to the delivery of local employability service called ‘No One Left
Behind’ (NOLB). This has seen the development of the strategic
employability partnership that includes representation from key
agencies such as SDS and DWP, who are now working alongside
Working 4U and local employability service providers to co-
ordinate efforts for the benefit of local residents. 
5.2    The local employability partnership has produced a plan to develop
and manage employability services. The approach is based on a
Scottish Approach to Service design and incorporates measures
to ensure that service providers, staff, and service users can feed
their views into the process of service design. 
5.3   The strategic employability group is focused on the most effective
use of grant funding for employability and has established a
procurement framework to acquire services. We have
complemented this with a competitive grant process that has
allowed us to draw on a broader range of specialist service
provision. The grant process generated interest from 17
organisations and of that group we have supported 14 with grants
to deliver employability services and access to training in sectors
where opportunities exist (care, hospitality, tourism, driving). 
5.4 Over the last quarter emphasis has been placed on developing our
contribution to the Regional Investment plan for the UK Shared
Prosperity fund (UKSPF). The fund has a potential value of
£3.8million for West Dunbartonshire and is centred on core
investment principles. The core investment principles are:
• Communities and Place - to enable places to invest to restore their
community spaces and relationships and create the foundations for
Page 16

Page 17

economic development and build resilient and safe neighbourhoods
through targeted investment and crime prevention. 
• Supporting Local Business – to enable places to fund interventions
that support local businesses to thrive, innovate and grow. This
includes visible improvements to local retail, hospitality and leisure
sector facilities and targeted support for small and medium sized
businesses to undertake new to firm innovation, adopt productivity
enhancing energy efficient and low carbon technologies and
techniques.
• People and Skills – to reduce the barriers some people face to
employment and support them to move towards employment; reduce
levels of economic inactivity through investment in bespoke intensive
life and employment support tailored to local need; and provide skills
development through a wider range of routes. 
5.5 In West Dunbartonshire we have aimed to develop interventions in
all three investment priority areas. We have established a sequential
approach for identifying the appropriate mix of priorities that are
consistent with the outputs and outcomes set out by the UKSPF
guidelines. This approach prioritises and builds on existing
commitments. This includes:
• Reviewing existing activity where continuity beyond European
Structural fund end dates is an issue and identify what can be
supported through UKSPF. For example the current employability
service is delivered with European Structural Funds that end in June
2023;
• Review existing plan priorities and consulting with stakeholders and
partners to identify eligible activity from those plan priorities that could
be delivered within the budget constraints.
5.5  The funding in West Dunbartonshire will focus on all priorities with
approximately £950,000 being invested in communities and
place;500,000 investment in business and 1.7m investment in
people and skills. In addition, 672,000 will be focussed on
improving numeracy rates in West Dunbartonshire. 
5.6 The next step in the development of the UKSPF following UK
Government endorsement of the plan will be to establish the
methods for using the funds and establishing an appropriate
monitoring framework
5.7      Meanwhile, in the first quarter of 2022/2023 we have supported
649 people to access employability services, with 100 securing
employment. During that period 143 people have secured a
qualification and 191 have entered education or training.  In
addition, we have assisted people to maximise income through
benefits with approximately £2m of additional income being
secured by people using our benefits advice service.    
Page 17

Page 18

6. Business Support
6.1  Over the last couple of years COVID-19, Brexit, rising inflation
and the energy crisis have all had and continue to have a
significant impact on the economic climate and as a result the
policy context at national and local level has had to change in
order to address these economic challenges. This has led to an
increased requirement for the development of a new Economic
Development Strategy for the local area. A new Economic
Development Strategy has therefore been developed which
provides an updated economic vision and strategic priorities for
West Dunbartonshire for a five year period from 2022-2027. This
will replace the previous Economic Development Strategy 2015-
2020 and will align with the Glasgow City Regional Economic
Strategy and Scotland’s National Strategy for Economic
Transformation. A copy of the draft strategy and the feedback
survey can be found at the following link: 
Economic Development Strategy | West Dunbartonshire
Council (west-dunbarton.gov.uk)
6.2 A local Investment Plan has been developed for the UK Shared
Prosperity Fund which has been submitted to the UK Government
for their approval as part of a wider Glasgow City Region
Investment Plan. UK Government have advised that we should
hear in October/November whether the Investment Plan has been
approved. The business support proposals within the Investment
Plan include a Business Recovery & Growth fund, Early Stage
Growth grants, Towards Net Zero Grant, Enhancing Tourism
Events & Attractions Fund, Business Gateway Expert Help and
Shopfront & Small Business Improvement Grants.
6.3  Since April 2022, the Business Support team have provided advice through 
Business Gateway to support approx. 100 new start-up
businesses. Business Growth Advisers have also continued to
work with established businesses to provide continued advice and
grant support to help them to recover and grow. A Business
Survey has been developed and sent out to local businesses that
received grant support last year to provide additional information
on the number of jobs created or sustained and also to provide an
opportunity for businesses to provide feedback on what business
support they think their business would benefit from in the future.
6.4  A High Growth Start-Up Challenge Fund has been developed in
partnership with Working4Business partners and will provide
funding of up to £5,000 to assist early stage businesses with
growth potential to increase their turnover and create local jobs.
This competitive fund will launch during September and
Working4Business partners will assist with the approval process
which will include the scoring of the applications and panel
interviews. 
Page 18

Page 19

6.5  The Scottish Government have confirmed additional funding to
continue the delivery of the national Digital Boost Programme.
The Digital Boost programme delivers Information and
Communications Technology (ICT) advice to businesses across
the country. A quick quote tender specification has been
developed by West Dunbartonshire Council for both East
Dunbartonshire and West Dunbartonshire Council areas for
Phase 7 Digital Boost activity. Once the tender submissions have
been scored the successful contractor will be appointed to work
with local businesses by the end of September 2022. 
6.6  The Working4Business group have agreed that the next Business
Awards event will be held in May 2023. Dunbartonshire Chamber
have indicated that they would like to be considered by the group
to lead on the organisation of the event and are going to submit a
formal proposal to the W4B group for their consideration by mid-
September 2022.
7. Regeneration
7.1  Regeneration works across our towns continue with support from
partners, in particular with the Chamber of Commerce as we
promote the ‘shop local’ campaign. The Council signed up to the
Shop Local Gift Card concordat, which, thanks to financial
assistance from Scotlands’ Towns Partnership (STP), was
promoted and managed locally by the Chamber of Commerce,
and discussions are ongoing on how this continues to be
resourced as STP funding comes to an end. 
7.2  As well as delivering projects that bring additional footfall to our
town centres, we have taken a strategic approach to town centre
regeneration. Alexandria Masterplan and Clydebank Town Centre
Development Framework, together with the ambitious Dumbarton
town centre proposals contained within our Levelling Up Fund
programme, provide a long term vision for the reimagining our
town centres against a backdrop of declining High Street retail.
We continue to support and develop projects that improve and
bring vibrancy to our town centres, including for example the new
Canal-side Activities Centre in Clydebank town centre which will
be delivered in 2023, and the now underway public realm and
lighting enhancements to the Smollett Fountain in Alexandria to
improve the setting and pedestrian activity around this important
town centre feature. In Alexandria, this will be closely followed by
the development of further Masterplan projects using Scottish
Government’s Place Based Investment Programme fund.
7.3  The West Dunbartonshire Energy centre has been operational
since November 2020 delivering heat to The Leisure centre, Care
Home, Titan Enterprise, and Aurora House. The District Heating
network is performing well and the newly established West
Dunbartonshire Energy LLP is overseeing its growth. The 147
Page 19

Page 20

Social Housing units on Titan Boulevard are connected and will
be commissioned as flats are completed in August 2022.
Clydebank Housing Association has also agreed to connect 45
flat units on Dumbarton Road. Plans continue to secure funding to
connect West College Scotland, and the Golden Jubilee
University Hospital, and agreement to connect the Clydebank
Health Centre. The Council are also pursuing funding from the
Scottish Government Green Growth Accelerator and Heat
Network funds to enable expansion and connection to the Dalmuir
multi story flats and officers continue to work with the Queens
Quay landowners to bring in 1,000 new homes. 
7.4  Good placemaking will continue to underpin the regeneration,
development and improvement work in the town centres as we
aim to align funding and resources, with Council, DIG partners
and external funding, to achieve our ambitions. The improvements
we have delivered in the town centres over the past five years
have been guided by placemaking and more recently, the move to
creating 20 minute neighbourhoods - where people have their day
to day needs provided within easy walking or cycling distance. For
environmental and health & wellbeing reasons active and
sustainable transport is now one of the regeneration priorities;
Connecting Clydebank, Connecting Dumbarton and the proposed
network of safe walking and cycle routes in Alexandria Masterplan
will contribute to this ambition. Scottish Government’s Place
Based Improvement Programme funding will help us realise these
ambitions over the next five years
. 
7.5  Council secured £19.9m Levelling-Up Funding from UK
government for an ambitious programme of regeneration of
Dumbarton Town centre including the acquisition and remodelling
of the Artizan shopping centre, the refurbishment and reuse of
Glencairn House as central library and museum, and Connecting
Dumbarton, which will see pedestrian and cycle links improved
between train station and town centre. Connecting Dumbarton
works will be delivered in 2023, Artizan Centre remodelling will be
phased over a number of years. Planning Application for
Glencairn House is expected to be submitted in September 2022.
The City Deal Exxon project is progressing as planned as are the
plans to convert the brownfield Carless site into a Scottish Marine
Technology Park in co-operation with the Malin Group. 
8. People Implications
8.1  There are no personnel issues.
9. Financial and Procurement Implications
9.1  There are no specific financial implications arising as a
consequence of this report.
Page 20

Page 21

10. Risk Analysis
10.1 There are no specific unassessed risks relating to this report 
11. Equalities Impact Assessment (EIA)
11.1 Equalities Impact Assessments are carried out in all key action
areas as required. 
12. Consultation
12.1 Ongoing consultation activity with both providers and service
recipients is undertaken allowing for flexibility of approach as
needs throughout period of pandemic and as we recover. 
13. Strategic Assessment
13.1 The contents of this report could impact on all community planning
strategic priority areas. 
13.2 The activity being developed and supported by the Flourishing DIG
will continue to contribute and reinforce our efforts to develop a
strong economy that provides access to opportunity for all in West
Dunbartonshire. 
Name  Peter Barry, Chief Officer Housing & Employability 
Person to Contact: Gillian McNamara
Gillian.mcnamara@west-dunbarton.gov.uk 
07815 705769 
Background Papers:  
Wards Affected:  All 
Page 21

Page 22

Page 22

Page 23

Report by Interim Head of Health and Community Care
Management Group: 28 September 2022
__________________________________________________________________
Subject: Independent Delivery and Improvement Group
1. Purpose
1.1 The purpose of this report is to summarise the current activity within West
Dunbartonshire HSCP Independent Delivery and Implementation Group.
2. Recommendations
2.1 It is recommended that the Board note the contents of this report.
3. Background
3.1 The Independent DIG works to a Local Outcomes Improvement Plan (LOIP) and
the key local outcomes detailed in the LOIP are:
• People are supported to live independently
• The quality of life for older people is improving
4. Main Actions
4.1 The Independent DIG met on the 11th July 2022 and the Chair provided
feedback from the Community Planning Management Group
4.2 The DIG members were asked to consider the cost of living crisis as a priority
issue within the key themes. 
4.3 Carers: The ‘Valued Carer’ Launch Event will take place on Friday 29th July.
The initiative will see carers registered with Carers of West Dunbartonshire
organisation issued with a Valued Carer Card, unlocking discounts,
promotions, and bespoke services specifically for unpaid carers. 
Businesses who support this initiative will be offered Carer Awareness
Training. The initiative is creating community relationships and raising
awareness for unpaid carers, making West Dunbartonshire a Valued Carer
area.
ITEM 13b
Page 23

Page 24

4.4 Activity: The group is progressing actions around activity for older people
within Care Homes. There is an opportunity for appropriately trained Care
Home staff to deliver Vitality class in a Home using online resources, and key
DIG members attended met with Vitality staff and attended a session to allow
them to share this with colleagues. 
Subsequently, feedback from Independent Care Home providers is that they
recognise the importance of providing opportunities for physical activity within
their Homes, and utilise their in house Activity Co-ordinators to deliver this. It
was felt therefore that there is no gap in service provision at this time.
Local Authority Residential Homes also have activity co-ordinators and are
looking to use the Vitality resource within these homes.
4.5  Activity: The ‘Live Active’ programme is a programme commissioned by the
Health Board across all HSCP’s to provide a structured fitness programme for
those who meet the referral criteria, with a discounted membership rate for 12
months. 
A component of the initial triage by Live Active staff is to consider the impact
of the cost of living, with links to Working 4U for those who may not be able to
afford the membership fee.
Referral must be via a healthcare professional (usually a GP) however
alternative referral pathways are being considered, along with current referral
data with a view to monitoring these over a 12 month period. 
4.6 Digital Solutions: Recent funding has been secured from ‘Connecting
Scotland’ to provide iPads and data packages to targeted groups with an
inequalities focused  approach to reducing inequalities and empower people
to take ownership of their health and wellbeing.
This funding will link with Improving the Cancer Journey, enhancing the health
needs assessment process of those receiving this service. Further progress of
this initiative will be reported via the LOIP.
4.7 The members of the DIG recognise that many of the staff within West
Dunbartonshire HSCP and Local Authority are also citizens and the need to
cascade all relevant initiatives across the local authority. Effective use of the
eBulletin will help inform this process.
5. People Implications
5.1  Nil
6. Financial Implications
Page 24

Page 25

6.1 Nil
7. Risk Analysis
7.1 NA
8. Equalities Impact Assessment (EIA)
8.1 NA
9. Consultation
9.1  NA.
10. Strategic Assessment
10.1  The LOIP will link with relevant HCSP / Local Authority Strategic action points
Person to Contact:  Fiona Taylor
Background Papers:   NA
Wards Affected:
Page 25

Page 26

Page 26

Page 27

Report by the Chief Education Officer
Management Group: 28 September 2022
__________________________________________________________________
Subject: Nurtured Delivery and Improvement Group (DIG)
1. Purpose
1.1 The purpose of this report is to:
• Update members on the work of the Nurtured Delivery and
Improvement Group (DIG).
2. Recommendations
2.1 Community Planning West Dunbartonshire is asked to:
• Note progress and focus of work.
3. Background
3.1 Through multi-agency planning, the Nurtured DIG aims to ensure:
• All West Dunbartonshire  children have the best start in life and are ready
to succeed and;
• Families are supported in accessing education, learning and attainment
opportunities and;
• Improved life chances for all children, young people and families.
3.2 The Nurtured DIG aims reflect the ambitions of the Council’s Integrated
Children’s Services Plan 
3.3 Since March 2020 all Nurtured DIG engagement has been remote.  This has
proven effective and ensured the range of stakeholders has been able to
attend.
3.4 Our Plan embeds the principles of Getting It Right for Every Child and ensures
the United Nations Convention of Children's Rights is central to the
development of our supports, services and engagement with all stakeholders. 
3.5 Recent Scottish Government feedback on the ICSP notes:
Areas of strength of the Plan 
• Clear priorities, outcomes, and actions (linked to detailed plans)
ITEM 13c
Page 27

Page 28

• Measurable indicators closely aligned to SHANARRI with clear
progress reporting measures
• Intention to involve children and young people directly in planning and
budgeting process
• Current budget and some projections included (projections may have
been unavailable at publication).
Areas where more support and development is needed
• Stronger links to National Performance Framework
• Additional information on strategic needs assessment
• Greater clarity on how engagement with young people informed the
chosen priorities and aims
• Inclusion of baseline information for selected indicators.
Reflecting on this and findings of the recent Care Inspectorate Inspection of
children at risk of harm, the ICSP and subsequent N.DIG Plan for 2022-23 is
being reviewed and revised.
4. Main Issues
4.1 At time of writing, the Nurtured DIG Plan for session ’22-’23 is currently being
reviewed.  It will reflect next steps in progressing our ICSP and recent
developments nationally and locally. It is anticipated outcomes identified will
address five main work streams: supporting mental health and wellbeing, the
Getting It Right for Every Child (GIRFEC) refresh, the implementation of The
Promise ’21-24, Whole Family Wellbeing and Child Poverty Report.  Members
of the N.DIG will lead these work stream groups consisting of a range of
partnership staff.
4.2 Council have been allocated funding to review, revise and improve
approaches to supporting families, focussing on early help and intervention
and aligning with key messages of The Promise.  Guidance and support will
be provided by Scottish Government in developing systems changes to
approaches to Children’s Services Planning.  A framework for self-evaluation
supports this and has been adopted.  It will be used to develop our on-going
self-evaluation and quality assurance processes. A set of prioritised topics of
wellbeing outcomes has been shared and will be reflected in our annual
measuring and reporting:  
https://www.gov.scot/publications/improving-outcomes-children-young-people-
families-review-childrens-services-plans-2020-2023-strategic-engagement-
activity/documents/
4.3 The Nurtured DIG plays a significant role in contributing to the required action
plan and monitoring emanating from the Joint Inspection of children at risk of
harm.  Progress is being made through the devised Action Plan and involves
input and support from a range of N.DIG members.  A series of Improvement
Planning Sessions with the Care Inspectorate were undertaken and staff
representative of the range of N.DIG partners will use knowledge gained and
Page 28

Page 29

expectations shared to implement collective improvements to systems and
processes.
5. People Implications
5.1 There are no people implications as a result of this report.  However, it is
essential that partners re-align resource allocation and priorities to meet the
needs of children, young people and families at this time. 
6. Financial Implications
6.1 There are no direct financial implications for Community Planning West
Dunbartonshire resulting from this report.  All activities related to the
implementation of these interventions are contained within service Budgets.
7. Risk Analysis
7.1 If the Council is unable to ensure positive outcomes for children, we will not
be meeting their needs (Children and Young People Act 2014) (Equalities Act
2010).
7.2 If the Council is unable to meet the needs of children, young people and
families this could result in reputational damage.
8. Equalities Impact Assessment (EIA)
8.1 The revised supports and guidance enhance the quality of the service
provided to all children, young people and families, therefore it can be seen to
have a positive impact in terms of the equalities
9. Consultation
9.1 Legal Services and the Section 95 Officer have been consulted in relation to
the content of this report.  
10. Strategic Assessment
10.1 This report reflects the Council’s aspiration to reduce inequalities for the
people of West Dunbartonshire. 
Person to Contact:  Claire Cusick Senior Education Officer
Background Papers:  CPD Nurtured DIG Report February 2022
Wards Affected: All
Page 29

Page 30

Page 30

Page 31

Report by Chair of the Empowered DIG
Management Group: 28 September 2022
_______________________________________________________________
Subject:  Empowered DIG Update
1. Purpose
1.1 The purpose of this report is to update members on the progress of the
Empowered DIG, outlining the core outcome areas of the 2022-24 workplan.
2. Recommendations
2.1 The CPP Management Group is asked to
• Note the contents of the report and the work undertaken and planned.
3. Background
3.1 The Empowered DIG action plan spans three local outcomes: We live in
engaged and cohesive communities; Citizens are confident, resilient and
responsible and Carers are supported to address their needs. 
3.2 Following recent discussions within the Management Board the group have
adopted the agreed strategic themes - Empowerment, Sustainability and
Wellbeing - to guide the development of the refreshed action plan. 
4. Main Issues
4.1 Work continues to progress well across the 8 focussed areas of DIG activity.
This report outlines the key developments during the last quarter.
Increased Rate of Volunteering (Empowerment)
4.2 Scotland’s Volunteering Action Plan was formally launched by Cabinet
Secretary, Shona Robison at the SCVO Gathering in June 2022. Under the
auspices of the Volunteer Engagers Forum, action will be progressed during
the autumn, to develop a complementary local plan, particularly addressing  
improving supply and demand and the volunteer experience.
ITEM 13d
Page 31

Page 32

4.3 Communication with a wide range of volunteer involving organisations
highlights considerable sector concern around the possible implication of the
growing cost of living challenges on volunteering activity. Inelastic budgets
mean that while the need for volunteers is increasing, the capacity to meet the
cost of volunteering e.g. travel expenses provision is not. Work is ongoing to
link organisations with sources of external income and a funders fair is
planned for later in the year.
Implementation of the CLD Action Plan (Empowerment)
4.4 The Community Learning and Development (Scotland) Regulations 2013
place a statutory requirement on local authorities to publish a CLD plan every
three years. The current plan spanning the period 2021 – 2024, offers a
commitment to work collaboratively to overcome the most significant issues
facing our communities. 
4.5 During the Spring of 2022, the Adult Learning Partnership, in collaboration of
West Dunbartonshire CVS, made a successful application to the Scottish
Government Community Based Adult Learning (CBAL) Recovery Fund for
resources to:
• Increased engagement and support for adult learners and communities
who need it most, including those disproportionately disadvantaged by
COVID-19
• Increased access to face to face learning opportunities with a focus on
supporting educational, social and emotional recovery and renewal
• Increased digital inclusion through the development of digital skills and the
improvement of digital infrastructure for learning
• Increased opportunities for adult learners to improve their health and well-
being.
• Stronger social connections between adult learners, their communities and
wider networks to tackle isolation and loneliness.
• Improved outcomes for adult learners through, for example, the
achievement of qualifications and the provision of positive pathways that
build confidence and develop skills for learning, life and work.
4.6 The West Dunbartonshire investment bid aligned resources to purchasing
‘Classroom in a Box’ resources to allow greater digital access across the
authority, increasing the range of courses available and facilitating access via
support for travel costs and neighbourhood level outreach. 
4.7 Despite some delays due to equipment supply, the £39,000 fund has already
successfully supported 116 adult learners.
Page 32

Page 33

Support to improve community mental health and wellbeing (Wellbeing) 
4.8 Following the recent announcement of year 2 Community Mental Health and
Wellbeing funding, work is underway to be ready to launch the £266,000 fund
in October 2022. 
4.9 The Fund, distributed by West Dunbartonshire CVS as the Third Sector
Interface (TSI’s), reflects the importance placed on community support as part
of the overall mental health infrastructure. Applications to the fund can only be
accepted from voluntary, ‘not for profit’ organisations, associations, groups
and clubs or consortiums/partnerships which have a strong community focus
for their activities. 
4.10 In 2022-23, the fund will again have a focus on:
• Tackling priority issues within the Transition and Recovery Plan such as
suicide prevention, social isolation and loneliness, prevention and early
intervention
• Addressing the mental health inequalities exacerbated by the pandemic
and the needs of a range of ‘at risk’ groups locally
• Supporting small ‘grass roots’ community groups and organisations to
deliver such activities
• Providing opportunities for people to connect with each other, build trusted
relationships and revitalise communities
• Supporting recovery and creativity locally by building on what is already in
place. 
4.11 Details of the communication and engagement plan are currently being
finalised and a series of on-line awareness sessions for potential applicants
will take place during September. 
Oversight of Dementia Friendly West Dunbartonshire (Wellbeing) 
4.12 Dementia Friendly West Dunbartonshire (DFWD), is a cross-sector authority
wide initiative, commenced initially in 2015, providing a programme of
community level awareness raising. Built on an active citizenship model, the
initiative provides free awareness raising sessions for organisation and
businesses across the authority area, in return for a pledge. 
4.13 The 2022 refresh plan has moved apace during the last quarter and has seen:
• A re-development of the DFWD page on the WDCVS website, linking
to session booking and general information
• Work commence on a new suite of resources included Hints and Tips
cards and business posters
• Refresh of the DFWD Twitter account, managed by DFWD Steering
Group members
• Recruitment of 2 champion volunteers to work through previous
contacts and offer refreshed sessions
• Delivery of awareness training to 108 local residents. 
Page 33

Page 34

4.14 External funding received from the Life Changes Trust, has also seen a
successful Call Blocker initiative, reducing the prevalence of telephone
financial scam calls for those most vulnerable. Partners in this initiative were
Police Scotland, WDCVS and Lomond and Clyde Care and Repair.
5. People Implications
5.1 There are no personnel issues at this time
6. Financial Implications
6.1 There are no funding issues at this time.
7. Risk Analysis
7.1 There are no specific unassessed risks relating to this report
8. Equalities Impact Assessment (EIA)
8.1 There are no specific EIA requirements relating to this report
9. Consultation
9.1 Ongoing consultation activity is taking place across both the DIG membership
and the Chairs Group to ensure plans are complementary and offer added
value.  
10. Strategic Assessment
10.1 The contents of this report could impact on all community planning strategic     
priority areas.
Person to Contact:  Selina Ross
selina@wdcvs.com
Background Papers: 
Wards Affected: All
Page 34

Page 35

Report by Safe Delivery and Improvement Group Chair
Management Group : 28 September 2022
___________________________________________________________________
Subject: Safe Delivery & Improvement Group – Progress update – August 2022
1. Purpose
1.1 The purpose of this report is to update the members on the progress of local
outcomes within the Local Outcome Improvement Plan 2017-2027 being
delivered by the Safe Delivery and Improvement Group (DIG).
2. Recommendations
2.1 Community Planning West Dunbartonshire are asked to note the contents of this
report.  
3. Key Discussions
3.1 The most recent Safe DIG meeting was held on 30th August 2022 with
Superintendent Lorna Gibson taking over as chair of the meeting from Chief
Inspector Coleen Wylie who has been successful in a promotion out with the
local policing division. 
3.2 The August Safe DIG meeting, focussed on updates from partners around
their recent activity with a focus on driving activity forward taking cognisance
of Covid Recovery and the cost of living crisis which will impact on many
aspects of community safety. Other core updates from the meeting were:
3.3      Local Outcome 1 - Anti-social behaviour/Violence     
A revised policing model has been created in West Dunbartonshire which now
has a dedicated Community Policing Team to provide high visibility and better
connectivity with partners from an operational perspective. This has already
seen positive results around the Dalmuir area where a dedicated action plan
is in progress to tackle some key challenges. The Safe DIG recognised the
benefit of this team linking in with Housing and the Alcohol and Drugs
Partnership. 
ITEM 13e
Page 35

Page 36

A multi-agency Wilful Fire-raising group has been formed to ensure a fully
connected partnership approach is taken to tackling this issue. Whilst reported
incidents have fallen since last year, there have been some more serious fires
this year causing community concern. Stronger links with education have
been developed with commitment to build 2 “Emergency Service” days per
year into the curriculum. The first of these will be in Autumn and will cover
fireworks, fire-raising, alcohol and drugs and anti-social behaviour.  The
second will take place in Spring and will cover water safety, personal safety,
alcohol and drugs and anti-social behaviour. The target audience will be those
in S1 and S2 with P7 being included where suitable. Police Community
Engagement Team have arranged for crime prevention letters to go to all
schools via education to help prevent vandalisms and fire raisings. Derelict
property owners will be lettered regarding their own responsibilities with
regards to securing their properties. This will be extended to include vacant
properties as SFRS have highlighted that vacant properties have more
flammable substances within them. 
An action taken at the August Safe DIG is for the current ASB strategy to be
circulated for comment with the November Safe DIG Meeting dedicated to
revising this in line with current challenges. Key to this is effective community
engagement and reporting. 
Estate walkabouts have been reintroduced with tenants/residents groups with
a number of action plans ongoing. This will widen to include further partners to
take a collective approach to target hardening communities to ensure better
and more cohesive communities. There is also work ongoing to develop an
ASB Handbook. The aim is for this to be tenant/resident focussed to provide
an overview of services, possible action and contacts. This will be shared via
social media and through various tenants and residents groups. 
3.4     Local Outcome 1 - Tacking Substance related harms
The Mobile Harm Reduction Unit is currently live in West Dunbartonshire with
local police officers being provided with familiarisation days at the unit. This is
to ensure they have a good working knowledge of this and can better assist in
signposting people to the unit who may be disengaged from services. 
Police Scotland and Scottish Fire and Rescue Service are both progressing
naloxone carriage by their officers. Whilst this will not assist non-opiate drug
overdose, it is seen as a positive step to reducing stigma and enabling wider
support to those most in need. 
It was agreed to hold a wider discussion in relation to the Arrest Referral
Scheme that has been operating in Clydebank custody suite due to ensure full
use was being made of the funded posts aligned to this. 
3.5 Local Outcome 1 - Caledonian Domestic Abuse Programme
Figures released in November 2021 indicate West Dunbartonshire as the
second highest area for prevalence of Domestic Abuse in Scotland. National
figures indicate 119 incidents of domestic abuse recorded by police per
Page 36

Page 37

10,000 population in 20-21. WDC sits at 168 per 10,000, an increase on the
previous year from 150.  Discussions throughout 21/22 have been held
between Justice/Children and Families Services and the National Caledonian
Team to bring the 1-1 programme to WDC. COVID has delayed this and we
are now in a position to confirm WDC as one of the authorities in Scotland to
host a court and non-court mandated 1-1 programme later in 2022. Police
Scotland also provided that they have strict governance around bail checks in
relation to domestic incidents to ensure compliance. 
3.6 Local Outcome 2 - Partnership Approach to Water Safety (PAWS)    
The PAWS group continues to be active with good representation from key
partners/stakeholders. This has included days with the British Heart
Foundation to include CPR training.  The practical benefits of the school
engagement programme were recognised during a water related incident in
Luss. This saw a male in distress in the water being recognised by a school
pupil who recalled the water safety input provided to him at school. The young
male pupil managed to seek assistance resulting in the male in the water
being rescued and air lifted to hospital, he has made a full recovery. 
3.7  Local Outcome 3 – Fraud Prevention
Work continues to raise awareness of frauds and the impact this can have on
the wellbeing of our communities. With an increase in frauds since the start of
the Covid-19 pandemic, call blockers provided through funding from WDCVS
have been installed at many addresses of vulnerable adults who have been
receiving scam calls on their landlines. Members of the Safe DIG were
encouraged to make referrals for call blockers to be installed if they were
aware of any vulnerable adults that would benefit from this. In addition to this,
due to recent bogus caller incidents, the Police Scotland Youth Volunteers
have assisted in letter drops to affected areas to ensure crime prevention
advice is provided. 
4. People Implications
4.1 No, all activity is delivered through the existing teams of the Community
Planning partners.  
5. Financial Implications
5.1 There are no direct financial or procurement implications from the updates
detailed in this report.  
6. Risk Analysis
6.1 The responsibilities contained within the Community Empowerment (Scotland)
Act 2015 and the Community Justice (Scotland) Act 2016 are fundamental to
planning and delivery of better services. The partners’ commitment to the
Safe DIG is an acknowledgement that the importance of this work is
recognised. 
Page 37

Page 38

7. Equalities Impact Assessment (EIA)
7.1 Whilst an EIA is not required for the focus of the Safe DIG, for each of the new
outcomes agreed by the Safe DIG Partnership, these will be checked against
the aspects of Equality, Wellbeing, Sustainability and Empowerment. It has
also been agreed that EIA will be a standing agenda item for all Safe DIG
meetings going forward. 
8. Consultation
8.1 This is an update on areas of work relating to the current work of the Safe
DIG. Consultation is carried out relevant to each project and initiative, as
appropriate by the action lead/partner agency.  
9. Strategic Assessment
9.1 This report confirms that the CPWD continues to deliver against the outcomes
set in the Local Outcome Improvement Plan.
________________________
Person to Contact: Supt Lorna Gibson (Lorna.Gibson2@scotland.police.uk)
Appendices: None
Background Papers:   None
Wards Affected: ALL 
Page 38