Democracy Spraffa

Developing Actions

Argyll and Bute Council · 6 December 2024
Back to Argyll and Bute Community Planning Partnership - Management Committee — 6 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Management Committee 
Date: 06 December 2024 
ABOIP outcomes – next steps 
1.0 Purpose 
To provide the CPP Management Committee with a draft set of actions to deliver the
agreed objectives under the three priorities of Transport Infrastructure, Housing and
Community Wellbeing. 
2.0 Recommendations 
The CPP Management Committee is asked to:
• consider and agree the recommended actions 
• Note that work is ongoing to explore further actions 
3.0 Background 
The Argyll and Bute Outcome Improvement Plan (ABOIP) priorities for 2024-2034 are
1. Transport Infrastructure, 2. Housing and 3. Community Wellbeing. 
A facilitated discussion at the CPP Full Partnership in September 2024 provided an
opportunity for partners to discuss these in more detail and share information on ‘what
is already happening and who is doing it?’, and explore ideas on ‘what is not already
happening that the CPP can work on together to achieve the outcome?’.   
A set of recommended actions from those discussions are contained here for
consideration. The appendices contain background information. 
For delivering the priority of Housing we have included here, for transparency, the CPP
actions from the Housing Emergency Summit which were agreed at the CPP meeting in
April, and the actions recommended following a meeting of partners to explore these
more fully. 
The draft set of actions contained here are not a definitive list and work is ongoing to
plan discussions in 2025 to further shape the actions needed to deliver the ABOIP.
These are, however, a basis on which action may be able to start to take place for
those actions contained here which the CPP is in agreement with. 
If the CPP agrees for the action related to research on Transport and inequalities there
is a further paper in the pack to assist with the next steps for this.

Page 2

4.0 Recommended Actions 
4.1 Transport Infrastructure
Recommended Action Transport Objective this relates to
Establish a transport
integration working group
Working with partners and communities to create a reliable,
accessible, affordable and integrated public transport system
for Argyll and Bute
Consider establishment of
community Active Travel
network 
Working with partners and communities to ensure a resilient,
well-maintained and safe road and active travel network
across Argyll and Bute
Research commissioned to
understand areas of greatest
transport-related inequalities
and to create baseline for
measuring successful
delivery of this objective 
Working with partners to enhance provision of bespoke
transport services for those experiencing the greatest
inequality in ease of movement 
Contributing to local and national strategic transport plans to
ensure the needs of communities experiencing inequalities in
transport infrastructure are acknowledged and addressed 
Co-producing partners’ plans for elements relating specifically
to tackling inequalities in transport infrastructure
Work with Area Community
Planning Groups to promote
local options for car-pooling/
sharing
Working with partners to enhance provision of bespoke
transport services for those experiencing the greatest
inequality in ease of movement 
Incorporate EV suggestions
within CPP Climate Change
Strategy 
4.2 Housing
Recommended Action from
Full Partnership 
Housing Objective this relates to
Establish a construction skills
development working group
Working in effective partnerships to ensure that everyone
living and working in Argyll and Bute has access to affordable,
warm homes of the right size, in the right place with access to
the services, amenities and economic opportunities that
communities need to thrive 
Local CPP communication
strategy on housing to
enhance development of
Local Place Plans
Ensuring that plans and policies are informed by communities’
needs and aspirations, especially those facing the greatest
inequalities in housing related outcomes 
Facilitate discussion at Area
Community Planning Groups
using existing data and
establish any demographic or
geographic data gaps
Working with partners and communities to ensure that
everyone has the ability to have a say in shaping what
housing looks like for their place

Page 3

Establish a partner land and
assets working group
Reviewing partners’ land and property assets to ensure
resources are used effectively to support the provision of
housing for key workers and others 
CPP and ACPG
Communication plan on
financial interventions to
prevent homelessness
Working together to identify opportunities for the prevention of
homelessness through early intervention
Incorporate Energy
discussion points within CPP
Climate Change Strategy 
Recommended action from
partner discussion, June
2024
Agreed Action from
Housing Emergency
Summit 
Housing Objective this
relates to
Housing Services to
commission an options
appraisal for this action;
CP team to support partners
to contribute, providing
insights and information and
to be part of the creative
process on solutions for
workforce accommodation. 
Deliver seasonal and
temporary workforce
accommodation using short
term occupancy agreements. 
Working in effective
partnerships to ensure that
everyone living and working
in Argyll and Bute has access
to affordable, warm homes of
the right size, in the right
place with access to the
services, amenities and
economic opportunities that
communities need to thrive
CP team to explore a more
formal route for monitoring
live demand and a more
collaborative approach, with
an evidence-based needs
assessment, potentially
dovetailing with HIE’s
quarterly surveys for
business.
Develop a strategic approach
to evidencing the need for
workforce housing in the
public sector. 
CP team to arrange
information sharing seminar
for Community Planning
partners to understand the
detail of this action point and
to be able to represent it
accordingly including carrying
influence through their
networks.   
Freedom to use Scottish
Government housing funding
more flexibly and as an
allocation with local
administrative control.
Ensuring that plans and
policies are informed by
communities’ needs and
aspirations, especially those
facing the greatest
inequalities in housing related
outcomes
Morag Goodfellow to check
on HIREP Housing Sub
Group work strands with
Morven Fancey, and Morven
to feed back to Morag who
will take feedback on
Create funding mechanisms
for Development Trusts to
finance feasibility studies,
professional fees and
approval process. 
Working with partners and
communities to ensure that
everyone has the ability to
have a say in shaping what
housing looks like for their
place

Page 4

mechanisms to the CPP for
consideration by partners;
Housing team to gather
examples where there are
the gaps in the Rural and
Islands Housing Fund and
pass on to the CPP; CPP to
understand how much
community groups are
spending on average on
feasibility;
Information to be collated by
Housing team from
Community Housing Network
on site investigations under
NPF4, then pass on to Morag
for taking to regional group
before it comes to the CPP. 
Availability of public sector
land and buildings to be
mapped against need with
the potential for GIS usage -
CP team to liaise initially with
Council’s planning team
which includes GIS staff.
Identify public sector land and
buildings which could provide
workforce housing via
repurposing and change of
use;
Map public sector land and
buildings which could provide
affordable housing via
repurposing and change of
use. 
Reviewing partners’ land and
property assets to ensure
resources are used
effectively to support the
provision of housing for key
workers and others
CPP to receive briefing on
Housing Scotland Bill 
Working together to identify
opportunities for the
prevention of homelessness
through early intervention 
4.3 Community Wellbeing

Page 5

Recommended Action
from Full Partnership 
Community Wellbeing Objective this relates to 
Broadening equality of access to Community Leadership
opportunities  
Providing the community
wellbeing pipeline – no
wrong door approach
- Look at funding
mechanisms such
as community
benefit 
Furthering equality of access to services, facilities and
community assets 
Consider options for ways
of working that enable
collaborative working on
assets and services within a
place 
Working with partners to maximise sustainability of
community facilities and services
Consider a CPP
engagement group to
support joined up
approaches to engagement 
Enabling a voice in collective decision making 
Action above and: 
Consider a CPP data group
to support data sharing
between partners and with
the community. 
Enhancing communication within communities 
Explore to what extent the
Living Well Network maps
community, social and
volunteering opportunities,
identify the gaps from this,
and create partnership
solutions to address the
gaps. 
Engage with the community
to better understand how
communities achieve a
sense of connection and
belonging, and identify
actions to support this
where there are gaps in
support.   
Better understanding how communities achieve a sense of
connection and belonging

Page 6

5.0 Implications 
Strategic Implications - The recommendations in this paper directly
address the objectives set out under each
outcome in the Argyll and Bute Outcomes
Improvement Plan 2024-2034
Consultations, Previous
considerations
Housing Emergency Summit, actions for CPP
agreed at April CPP Meeting
Resources - A number of recommendations will require in-
kind contributions and participation from
Community Planning Partners
- Funding for the transport inequalities research
commission – See separate paper
- CP team resource for analysis and report
compilation on completion of the transport
inequalities research – See separate paper
Prevention 
Equalities - The paper includes recommendations to
address inequalities experienced by vulnerable
groups in our society
Climate Change - The paper makes mention of climate change-
specific issues with recommendations linking
those to the CPP climate change strategy 
For more information, contact:
Rona Gold
Communities and Partnership Manager 
rona.gold@argyll-bute.gov.uk   
References
Argyll and Bute Outcomes Improvement Plan 2024-2034 (2024)
https://www.argyll-bute.gov.uk/sites/default/files/2024-03/ABOIP%202024-2034%20-
%20Support%20Document.pdf 
Appendices
Appendix 1: The 5 agreed Objectives under Transport Infrastructure: suggestions on
what CPP partners can do to deliver (from Full Partnership, September 2024,
meeting).
Appendix 2: The agreed Objectives under Housing: suggestions on what CPP
partners can do to deliver (from Full Partnership, September 2024, meeting).
Appendix 3: The agreed Objectives under Community Wellbeing: suggestions on
what CPP partners can do to deliver (from Full Partnership September 2024,
meeting)

Page 7

No embedded text on this page.

Page 8

Appendix 1: The 5 agreed Objectives under Transport Infrastructure:
suggestions on what CPP partners can do to deliver. 
Objective 1. Working with partners and communities to create a reliable, accessible, affordable
and integrated public transport system for Argyll and Bute 
- Do the transport providers collaborate? – integrated timetables between modes of
transport: Calmac, West Coast Motors and Scotrail
- Joined-up thinking – transport links not meeting each other – longer waiting times
- Transport integration – hard to integrate, difficult to change
- Make it more joined up – train and ferry meeting bus timetables for individual
- Joined up working across different authorities, e.g. Argyll and Bute Council, Inverclyde
Council – sync bus and train times and ferries
- Map use of island-mainland transport, e.g. getting to and from pierhead and avoiding
putting car on ferry
- Need to create better service options for public transport and ferries – fund operational
costs to deliver the service people and business need
- Bus companies could fit cameras to film road condition and report
- Community connectivity for local journeys – bus services where leaving towns on time
- Are there big public transport innovations happening? 
Objective 2: Working with partners and communities to ensure a resilient, well-maintained and
safe road and active travel network across Argyll and Bute 
- More support for active travel/health walks/local third sector initiatives to develop
hyper local walks/health walks/active travel initiatives – local support/regional
information sharing and cohesion
- Active travel initiatives intersect with wellbeing strongly – it would be good to develop
stronger partnerships with the view of creating actionable, tangible change/comms 
Objective 3: Working with partners to enhance provision of bespoke transport services for those
experiencing the greatest inequality in ease of movement
- ‘Pingo’ – demand responsive transport for more areas, especially Lochside Resource
Centre
- Opportunities to support community based transport such as volunteer driver services
to appointments/car share for work/shopping 
Objective 4: Contributing to local and national strategic transport plans to ensure the needs of
communities experiencing inequalities in transport infrastructure are acknowledged and
addressed 
- CPP can help get the community voice presented to those planning services
- National agencies/Scottish Government to fully understand the implications of rural
transport network
- Logistics – flow – whisky – waste – use of sea freight 
Objective 5: Co-producing partners’ plans for elements relating specifically to tackling inequalities
in transport infrastructure
- Health and transport could be helped by CPP partners planning services and
appointments in a joined up way 
Additional Transport Infrastructure comments from Full Partnership

Page 9

EV Charging
- Charging points for electric cars
- Grid capacity – EV charging or housing?
- More charging points at faster speed
- Community car charging network
- Electric vehicle fast charging infrastructure
- EV charging points 
Car Pooling/Sharing
- Car share apps?
- Is there a business case for a car pool, e.g. in Oban for islanders travelling on mainland
- Car sharing
- Post-Covid reboot of car sharing
- Consideration given to joined up working with Further Education and transport – more
use of pool cars/car sharing

Page 10

Appendix 2: The agreed Objectives under Housing: suggestions on what CPP
partners can do to deliver (from Full Partnership, September 2024, meeting). 
1. Working in effective partnerships to ensure that everyone living and working in Argyll and
Bute has access to affordable, warm homes of the right size, in the right place with access
to the services, amenities and economic opportunities that communities need to thrive 
- Opportunity to improve quality of housing through extending insulation grants/support
– would benefit finances and health of population
- Private homeowners upgrading, e.g. heat pumps, when RSL contractors are in the areas
- Factor climate considerations into new build and retrofit – do repairs still have to be to
same standard as original (e.g. wind damage)
- Faster rollout of air-source heat pumps and other tech solutions
- Insulation to old properties more accessible and free help with reducing heating costs
- Focus required on different type and tenure of homes – across Argyll and Bute
- More pragmatic approach to modular/caravan park homes
- Short-term lets - affordable housing
- Accommodation available for short-term, i.e. failed short-term housing market
- Training shortages in planning, building – community benefit conditions on planning
applications
- Planning restrictions – skills
- Skills gap – encouraging young people to go into construction or planning
- Skills gap and workforce gap, particularly relating to Argyll and Bute Council Planning
and Development Team – too few staff to process planning applications within
timeframes – hold up/prevent development of single dwellings in rural parts
- Assessment of viability of local materials – and reuse 
2. Ensuring that plans and policies are informed by communities’ needs and aspirations,
especially those facing the greatest inequalities in housing related outcomes 
- Highlight what is needed in the local areas and ensure that the outcomes meet the
needs of the community
- Better at consulting with hard to reach groups via good local networks
- Sharing community engagement results – e.g. Local Place Plan engagement for housing
feasibility
- Support community organisations’ operational costs to deliver and manage housing 
3. Working with partners and communities to ensure that everyone has the ability to have a
say in shaping what housing looks like for their place 
- Support for community groups for self-build or community build – financial support for
social housing construction costs on islands
- Using existing networks to share information about available resources for
communities in terms of warmer homes – building on existing work
- Community benefit conditions for private sector developers/companies – i.e. build x
homes in return for large capital public sector funding
- Capacity to deliver – linking housing to Community Wealth building – linking other
services to housing lead times with education the most important 
4. Reviewing partners’ land and property assets to ensure resources are used effectively to
support the provision of housing for key workers and others 
- CPP partners – look at land and property assets – make best use
- Job-related accommodation – firefighters’ house
- Mapping/shared ownership

Page 11

- Better understanding of ownership of land and assets – poor landlord behaviour
- Build on existing projects such as Our Modern Workspace to identify assets which are
surplus and can be utilised for a different purpose 
5. Working together to identify opportunities for the prevention of homelessness through
early intervention
- Promote interventions to support financial information/skill to allow people to avoid
homelessness due to finance
- CPP partners can support staff, e.g. financial hardship funds to prevent homelessness –
as well as clientele
- Signposting to agencies

Page 12

Appendix 3: The agreed Objectives under Community Wellbeing: suggestions
on what CPP partners can do to deliver (from Full Partnership September 2024,
meeting) 
1. Broadening equality of access to Community Leadership opportunities 
2. Furthering equality of access to services, facilities and community assets
- Identify and close gaps in universal services, e.g. optometry services
- Providing the community wellbeing pipeline – no wrong door approach
- Strength and balance activities consistently across areas, including villages
- Could the (uneven) distribution of community benefit ££ be shared, e.g. projects such as
community halls 
3. Working with partners to maximise sustainability of community facilities and services
- Older community spaces are getting more expensive to hire as costs go up
- Crossover between employability, community wealth, recovery oriented system of care
- Consider the employability pipeline model as best practice model
- Collaboration on provision to parents, e.g. parental employability support and
interventions funded by No One Left Behind employability monies
- Better communication to ensure all partners are aware of the various work ongoing –
utilising data for targeting certain areas for better decision making, collaboration and
improvements 
4. Enabling a voice in collective decision making 
- Communicating with communities so they feel listened to, especially hard to reach
vulnerable – Gypsy travellers – victims of domestic abuse
- There is a focus within the economic strategy for Argyll and Bute Council on a wellbeing 
economy, which will require community input/involvement 
5. Enhancing communication within communities 
- Opportunity for joined up engagement and communication of data/information and
joining up of activities 
6. Better understanding how communities achieve a sense of connection and belonging  
- Find activities, e.g. beach cleans, community gardening tidy ups, etc – give people
something to do – new members of the community come along – feel part of doing
something useful, good – gets people outside
- Heritage/place-based volunteering creates social outcomes