Update Report on Argyll and Bute Climate Action: a Climate
Change Strategy and Action Plan for Argyll and Bute. 
1.0 Purpose 
The purpose of this report is to provide an update on the Community Planning
Partnership’s Argyll And Bute Climate Action project: developing a Climate Change
Strategy and Action Plan for Argyll and Bute. 
2.0 Recommendations 
The CPG is asked to note the approach and status of the project outlined in the
report and to provide any comments or feedback to the project manager. 
In particular, the CPP is asked to
• Approve the updated strategy document, previously approved as a draft by
the CPP Management Committee in December 2024,
• Approve updates to the Terms of Reference for the project steering group
• Consider whether to treat Resilience as the top Priority Area for Action from
the set of priority areas previously agreed by the Committee. 
3.0 Background 
The CPP sub-group working on climate change is the Climate Change Working
Group. Its current focus, following approval by the CPP Management Committee of
the draft Climate Change Strategy in December 2024, is to produce an Action Plan
in support of that strategy.
Argyll Countryside Trust (ACT) is the employing body for the Climate Change Project
Manager leading on the process, and the post (0.8 FTE) is funded by the CPP from
end October 2023 to October 2025.
This update sets out the current position.
4.0 Detail 
4.1 Progress

Page 2

4.1.1 Strategy
The CPP Management Committee approved the strategy as a draft at its meeting of
6 December 2024. The draft strategy was thereafter presented to the Climate
Change Working Group and Area CPGs over January to March 2025, with requests
for further feedback including appropriate engagement opportunities.
Based on the feedback received, an updated draft is now attached for the CPP
Management Committee’s approval.
Principal changes are:
• formatting and minor changes to improve readability
• clearer linkage with the CPP’s three Outcomes
• ensuring reference to electric vehicles/charging infrastructure
• changing the number of Priority Areas for Action from 7 to 6 by bringing
together Skills Development and Procurement/Supply Chain, bringing this
more in line with other strategies in place across the CPP. The revised set of
Priority Areas for Action is thus
o Infrastructure (includes natural infrastructure)
o Policy Influence
o Skills, Procurement and Supply Chain
o Resilience/Carbon Literacy
o Risk Assessment
o Crosscutting/Other
4.1.2 Action Plan
The Management Committee previously agreed that:
• the strategy should focus on action within its own agency to control or
influence;
• development of the action plan would likely reflect partners’ capacity to
engage over and above their normal core work
• the Management Committee should provide direction as the action plan
develops on the balance between playing to the CPP partners’ strengths or
seeking to address gaps and weaknesses.
The Climate Change Working Group has been considering an Action Plan structured
around the six Priority Areas for Action and a copy of the discussion document from
its workshop in March and scheduled follow up in early April including an outline
action plan is appended. 
Examples of actions included to date span:
• actions from existing plans and strategies across the CPP members where
collective action by the CPP can enhance delivery

Page 3

• suggestions from stakeholder meetings over the strategy development period
• suggestions from broader meetings including Area CPG and local resilience
groups
• asks to central government with long lead in times
• quick or low cost wins, especially around community resilience and risk
assessment  OLI ACPG provides an example where the ACPG has decided
to establish a sub group to support up to date climate/resilience plans,
including engaging with young people, across the CPP area as a defined
action 
Some recurrent themes are:
• The importance of policies and actions that reflect Argyll’s specific geography
and demographics
• Capacity building versus resourcing
• The importance of community resilience with increased likeliness of ever
greater climate and severe weather events
• Some groups have suggested that resilience should be emphasised among
the six Priority Areas for Action
• Within Resilience, Communication has been suggested as the single
overarching measure, particularly in light of post-Eowyn lessons 
4.2  Next Steps 
Immediate next steps are:
• Ongoing engagement, including Area level
• Specific engagement on resilience including communities and LRP partners
• Ongoing mapping, local impact projections and risk assessment
• Ongoing action plan and project development 
Andy Macpherson, Climate Change Project Manager 