West Dunbartonshire Council Internal Audit Annual Report 2025/26 Gillian McConnachie Chief Internal Auditor ITEM 5 APPENDIX 1
Page 2
Annual Internal Audit Report 2025/26 This Annual Internal Audit Report is a summary of the activities of West Dunbartonshire Council’s (the Council) Internal Audit Team for the financial year 2025/26 and includes the internal audit opinion at Appendix 1.1. The opinion concludes on the adequacy and effectiveness of the Council’s framework of governance, risk management and control. It supports the annual governance statement which will be included in the annual accounts and financial statements. It considers the expectations of senior management, the Audit Committee and other stakeholders. It is supported by sufficient, reliable, relevant and useful information, as referenced in the body of this report. Through utilising such information, Internal Audit demonstrates compliance with relevant Internal Audit Standards - Global Internal Audit Standards in the UK Public Sector (GIAS-UKPS). Internal Audit Opinion The full statement and opinion provided at Appendix 1.1, confirms my opinion that the adequacy and effectiveness of the Council’s internal control systems, governance and risk management systems in the year to 31 March 2026 are concluded as being Generally Satisfactory with some improvement needed. This means members can be assured proper processes are in place to enable the achievement of the Council’s strategic priorities. Key Areas for Improvement In reaching this conclusion, I note risks raised by Internal Audit in the current year relating to Housing Repairs and Maintenance. Individually, these risks do not significantly impair the Council’s systems of internal control. Furthermore, management have reported progress and detailed plans to mitigating these risks. The remaining risks will continue to be kept under review, with auditors monitoring compliance with the agreed actions as part of regular follow- up updates which will be reported to the Audit Committee. The opinion at Appendix 1.1 represents a consolidated view, informed by several sources and, in bringing these together, considers whether there is evidence key controls are absent, inadequate or ineffective. The work includes an assessment of any weaknesses identified and whether these, taken independently or with other findings, significantly impair the Council’s system of internal control. Wider considerations relating to the Council’s corporate governance framework and risk management arrangements have also been reflected on in providing the opinion. The level of assurance provided by the Internal Audit Team can never be absolute. This reflects the sample nature of the work carried out, the relative scope and objectives of audit assignments and those explanations offered, and evidence provided by officers. In addition, factors external to the audit process including human error, collusion or management overriding controls as a potential for systems, historically highlighted as being satisfactory, to become exposed to risk or loss.
Page 3
Summary of Work Supporting the Opinion The opinion is informed by several sources, including the internal audit work completed in the year. Each audit assignment addresses a specific area of risk. The risk of fraud is also considered in each assignment, together with any governance or risk management implications. This allows the Council’s Chief Internal Auditor, to draw sustainable conclusions based on a range of activities that reflect the diversity of work carried out by the Council. The team has had a challenging year, with vacancies impacting on completion of the Audit Plan (the Plan). Whilst sufficient resources have been allocated by the Council to Internal Audit in its budget, resource limitations as a result of vacancies have impacted on the timely completion of the Plan. There have been vacancies at the Shared Service Manager, Lead Internal Auditor, Internal Auditor, and Audit Assistant levels. Whilst progress has now been made towards filling these vacancies there has been a material impact on the results of the team for 2025/26. Nonetheless, the following has been completed by the team in the year: • Follow up work on previously raised issues, including on the Housing Repairs and Maintenance Report which included two red and eleven amber findings. • Payroll high earners – quarterly review (quarters 1 to 2 completed) The team has completed the following in the year, in support of the annual audit opinion: • Void Management Audit • Housing Repairs and Maintenance Audit • Procurement Compliance Audit (nearing completion) • Payroll High Earners – Review – Quarters 1 and 2 • Internal Audit Follow up reports • Review of governance arrangements • Corporate Fraud Activity Whilst the audit work has fallen short of expectations for 2025/26, the team completes audit work on an ongoing basis and the Chief Internal Auditor includes other sources of assurance in reaching her opinion including the work completed in previous years by Internal Audit. A detailed comparison of the work carried out against the Plan is provided at Appendix 1.3. The opinion is also informed by follow up work, which involves reviewing the extent to which those risks previously identified have been subsequently managed or mitigated. Updates are a standard agenda item at Audit Committee and are also reported to the Council’s Senior Management Team. An update on outstanding audit actions is included in the Internal Audit Progress Report. The consolidated follow up work has identified that five actions to address a Red risk relating to the Adequacy of Housing Client Function from the Housing Repairs and Maintenance audit remain outstanding, with a revised target date of 30 June 2026. These
Page 4
actions will be followed up on during 2026/27. Whilst acknowledging the significant and ongoing work and the continued pressures on services, auditors ask for prioritised focus in closing off the remaining outstanding Red issues relating to the Housing Repairs and Maintenance audit. Additionally, the Council’s Chief Internal Auditor provides representation to the Glasgow City Deal Audit Support Group. The Group is a key requirement of the City Deal assurance framework and is an important consideration in the overall governance arrangements. Representatives of the group are required to provide an Assurance Statement on behalf of their councils, highlighting any concerns or weaknesses that may need to be taken into consideration by the Glasgow City Region Cabinet. Having reviewed City Deal activities within West Dunbartonshire Council, the wider governance arrangements within the Council, there were no material issues that needed to be brought to the attention of the Glasgow City Region Cabinet; the statement was therefore prepared on this basis. Internal Audit Output Summary The 2025/26 annual audit plan included provision for a direct allocation of 285 audit days and planned completion of three risk based audits, in addition to regularity audits and other work. The plan to deliver the programme represents the commitment of the team to deliver an opinion based on the widest possible range of audit work. Full details on these audits have been provided in the internal audit updates to Committee. This work supports both this Annual Audit Report and opinion and the Annual Governance Statement in the accounts. Where internal audit has identified risks in the areas reviewed, action plans have been agreed. The agreed actions are logged on the Ideagen Pentana performance management system and will be followed up on and progress reported back to the Audit Committee. Consideration of the Council’s management of risk forms part of the overall internal opinion for the year. When reviewing arrangements in place, auditors have noted that the Strategic Risks are regularly reviewed and updates presented to the Audit Committee, with this occurring in the year on 24 September 2025 and 18 February 2026. Standard Committee templates also include a section for the consideration of risk and control measures for all reports, under the heading of ‘Risk Analysis’. This promotes a risk aware culture. A Risk Management Strategy is in place, with risks being considered in the preparation of service Delivery Plans. The team has a suite of KPIs in place and these will be reported on at the next committee. It is expected that these results will reflect the vacancies in the team during the year and will act as a benchmark for improvements in 2026/27 and beyond. Full detail of the audits completed and in progress is provided at Appendix 1.3. Such cut-off and completion challenges can be managed in support of the annual audit opinion, provided that there is sufficient evidence to support the annual audit opinion each year. When taken together with the audit history over the last three financial years, as outlined at Appendix 1.4, it is the opinion of the Chief Internal Auditor that sufficient evidence has been obtained to enable the provision of the year end audit opinion.
Page 5
Annual Assurance - Several documents that collate the work of the Internal Audit team have been produced or are in progress as part of the team’s responsibility for annual assurance. These are: follow up reviews, the Annual Internal Audit Report (this document), the drafting of the Annual Governance Statements for inclusion in the Council, and, additionally, an Annual Audit Report on the Council’s audit work for the Integrated Joint Board and an assurance statement for City Deal. Audit Development Allocations of time to Audit Development represent resources dedicated to the development of quality processes, benchmarking and adherence to good practice requirements. An Internal Audit Satisfaction Survey has been developed for services to complete following the conclusion of each audit. The results of these surveys are monitored to identify opportunities for improvement within the service. Co-ordination with External Audit During the year under review, liaison has taken place with the Council’s External Auditors Forvis Mazars through joint attendance at the Audit Committee, meetings, ad hoc discussions and the sharing of audit plans and reports. Progress against improvement plans The Internal Audit service takes a ‘continuous improvement’ approach to our internal audit work. This is reflected in our reports and recommendations made to services and also in the approach to the internal audit work itself, with a focus in making incremental improvements to our work through efficiencies, and/or improved quality. This helps us to improve our quality and adherence to relevant Internal Audit Standards (GIAS-UKPS), and to focus on the areas of greatest risk and where we are able to add the most value. Impairments or Restriction of Scope There have been no impairments or restrictions of scope during the course of the year. Reliance on Other Assurance Providers The internal audit opinion also includes consideration of the work of other assurance providers. This includes those reports, where appropriate, issued by the Council’s external auditors, Forvis Mazars, and other scrutiny partners. Global Internal Audit Standards in the UK Public Sector – GIAS-UKPS The Internal Audit Team is required to work to a set of rules – GIAS-UKPIAS. These rules apply to all public sector internal auditor teams. It is a requirement of these standards that periodic self-assessments are conducted to evaluate conformance with the GIAS-UK. Under Section 7 (1) of the Local Authority Accounts (Scotland) Regulations 2014, the Council must operate a professional and objective internal auditing service in accordance with recognised standards and practices in relation to internal auditing. The Council defines such standards as those set out within the GIAS-UKPS.
Page 6
The Public Sector Internal Audit Standards (PSIAS) were the previous applicable standards that the Internal Audit team conformed with. From 1 April 2025 GIAS-UKPS became the applicable standards. To ensure compliance with prevailing standards the service works to quality methodology, as set out in the audit manual. The audit manual has been previously specified to comply with Public Sector Internal Audit Standards which were the previous applicable standards. The GIAS-UKPS are the new applicable standards and there has been an initial consideration of processes against the GIAS-UKPS. This assessment has identified the following areas as requiring further improvements to ensure full conformance: • Root cause analysis • Documentation of the evaluation of controls in working papers The above actions will be progressed in 2026/27. The transition plan to achieve full conformance with GIAS-UKPS has been extended into the year 2026/27 and will be carried out by the Chief Internal Auditor and the results reported to the Audit Committee. In addition, an external quality review will be required to be carried out against GIAS-UKPS. This will be arranged as a peer review via the Scottish Local Authority Chief Internal Auditors Group. Questionnaires have been made available to services to complete for each audit assignment and provide an opportunity for the auditee to provide feedback on the planning process, communication and the quality of the internal audit report. All audit files are reviewed by the Lead Auditor or the Chief Internal Auditor to ensure high standards are maintained and to encourage a continuous improvement approach by the team. Other Issues I am aware of no other material issues that require to be reported at this time.
Page 7
Appendix 1.1 STATEMENT ON THE ADEQUACY AND EFFECTIVENESS OF THE INTERNAL CONTROL ENVIRONMENT OF WEST DUNBRTONSHIRE COUNCIL FOR 2025/26. To the Elected Members of West Dunbartonshire Council, the Chief Executive, the Chief Officer – Resources (Section 95 Officer), and the Corporate Management Team As the Chief Internal Auditor of West Dunbartonshire Council, I am pleased to present my annual statement on the adequacy and effectiveness of the internal control system of the Council for the year ended 31 March 2026. Respective Responsibilities of Management and the Internal Audit Team in Relation to Governance, Risk Management and Internal Control It is the responsibility of the Council’s senior management to establish appropriate and sound systems of governance, risk management and internal control to monitor the continuing effectiveness of those systems. It is the responsibility of the Council’s Chief Internal Auditor to provide an annual overall assessment of the robustness of governance, risk management and internal control. The Council’s Framework of Governance, Risk Management and Internal Controls The main objectives of the Council's framework of governance, risk management and internal controls are to ensure that resources are directed in accordance with agreed plans, policies and priorities and to ensure that there is sound decision−making and clear accountability for the use of those resources in order to achieve the desired outcomes for service users and communities. This includes ensuring appropriate internal controls and risk management arrangements are in place in order to effectively manage issues which might impact on the delivery of Council services, the achievement of corporate and service priorities and public confidence in the Council. The Council also requires effective internal controls and risk management arrangements to safeguard its employees, protect its assets, maintain effective stewardship of public funds, ensure good corporate governance, ensure compliance with statutory requirements and ensure it continues to deliver best value. A system of control can only ever provide reasonable and so not absolute assurance that control weaknesses or irregularities do not exist. It cannot guarantee there is no risk of material errors, losses, fraud, or breaches of laws or regulations. Nonetheless, the Council is continually seeking to improve the effectiveness of its systems of governance, risk management and internal controls in order to minimise these risks. The Work of the Internal Audit Team Internal audit is an independent appraisal function, established by the Council in line with statutory requirements to review the internal control system. This function is provided as a service to the organisation as a whole. The Internal Audit Team objectively examines,
Page 8
evaluates and reports on the adequacy of internal controls in place to mitigate risks to achievement of the Council’s strategic priorities. The Internal Audit Team has undertaken a programme of work in the year, in line with the Audit Plan which was produced in consultation with Senior Management and key stakeholders, to understand the key risks facing the Council. All Internal Audit reports identifying system weaknesses, risks and/or non-compliance with expected controls are brought to the attention of senior management and significant findings presented to the Audit Committee. Audit reports and action plans provide insight into the risks identified and include an agreed narrative highlighting the Service’s intended course of action, including the timescales involved to mitigate and manage the risk. It is management’s responsibility to ensure proper consideration is given to internal audit reports and appropriate action is taken on those risks identified. The Internal Audit team is required to ensure appropriate arrangements are made to determine whether action has been taken on agreed reports or, where appropriate, that management has understood and assumed the risk of not taking action. Significant matters (including non-compliance with audit recommendations) arising from internal audit work are reported to the Audit Committee and Senior Officers. Auditors have noted that some risks previously highlighted by auditors remain ‘in progress’. Management have reported progress towards mitigation of these issues and Auditors will monitor compliance with the agreed actions as part of a regular follow-up cycle, and updates being reported to the Audit Committee. Impairments or Restriction of Scope There have been no impairments or restrictions of scope during the course of the year. Basis of Opinion My evaluation of the control environment is informed by a number of sources: • The audit work undertaken by Internal Audit during the year to 31 March 2026. • Internal audit work undertaken in previous years and the follow up work undertaken in 2025/26. • The assessment of risk completed during reviews of the annual audit plan. • The Code of Good Governance self-assessment process undertaken by the Chief Officers for the services for which they were responsible during the year to 31 March 2026. • The Council’s Annual Governance Statement for the year ended 31 March 2026. • Reports issued by the Council’s External Auditors, Forvis Mazars, and other review agencies. • My knowledge of the Council’s governance, risk management and performance management and monitoring arrangements.
Page 9
Opinion It is my opinion that the adequacy and effectiveness of the Council’s governance, risk and control framework is Generally Satisfactory with some improvement needed for the year to 31 March 2026. Gillian McConnachie CA Chief Internal Auditor 10 June 2026
Page 10
Annual Opinion Types Satisfactory Controls evaluated are adequate, appropriate and effective to provide reasonable assurance that risks are being managed and objectives should be met. • A limited number of Amber rated issues may have been identified, but generally only green issues have been found in individual audit assignments. • None of the individual assignment reports have an overall opinion of Requires Improvement or Unsatisfactory. Generally Satisfactory with some improvement needed A few specific control weaknesses were noted: generally however, controls evaluated are adequate, appropriate and effective to provide reasonable assurance that risks are being managed and objectives should be met. • A number of Amber rated issues identified in individual audit assignments that collectively do not significantly impact the system of internal control. • Red rated issues that are isolated to specific systems or processes. • None of the individual assignment reports have an overall opinion of Unsatisfactory. Major improvement needed Numerous specific control weaknesses were noted. Controls evaluated are unlikely to provide reasonable assurance that risks are being managed and objectives should be met. • A high number of Amber rated issues that collectively have a significant impact on some parts of the system of internal control but are not widespread. • A number of Red rated issues that collectively have a significant impact on some parts of the system of internal control but are not widespread. • A small number of individual assignment reports have an overall opinion of Requires Improvement or Unsatisfactory. Unsatisfactory Controls evaluated are not adequate, appropriate or effective to provide reasonable assurance that risks are being managed and objectives should be met. • Amber and Red rated issues identified in individual assignments that collectively are widespread to the system of internal control. • A high number of individual assignment reports have an overall opinion of Requires Improvement or Unsatisfactory.
Page 11
Progress on the 2025-26 internal audit plan Planned audit coverage 2025/26 Status Risk Based Reviews Budgetary Control (c/f 24/25) In progress Care At Home - Delayed Discharge Arrangements Deferred to 26/27 Estates – Commercial and Industrial Property Rents and Leases Deferred to 26/27 Regularity Audits High Earners – Quarterly check In progress (complete for Quarters 1 to 2) Section Payments Not completed Education Control Self-Assessment Not completed Corporate Purchase Cards – quarterly check Not completed ALEO Review West Dunbartonshire Leisure Trust Not completed IJB Review West Dunbartonshire Integrated Joint Board In progress and nearing completion. VJB Review Valuation Joint Board Not completed The following audits from the 2024/25 plan were completed or are nearing completion: 24/25 Audit Plan Completion Status Risk Based Reviews Void Management Complete Housing Repairs and Maintenance Complete Procurement Compliance Nearing completion
Page 12
Audit History – Audits completed over last 3 years Report Title Status Findings Control Environment Opinion Red Amber Green Risk Based Reviews Completed in 2025/26 Housing Repairs and Maintenance Final Report 2 11 3 Requires Improvement Void Management Final Report 0 4 4 Satisfactory Procurement Compliance Substantially Complete TBC TBC TBC No significant issues identified to date Completed in 2024/25 Commercial Waste Income Billing and Collection Final Report 0 3 3 Satisfactory Debt Recovery Final Report 0 1 2 Satisfactory UK Shared Prosperity Fund Final Report 0 3 1 Satisfactory Completed in 2023/24 Corporate Complaints Complete 1 4 0 Requires Improvement Supporting Employee Attendance Complete 0 4 2 Satisfactory FM Cleaning – Stock Control Complete 0 5 1 Satisfactory Corporate Procurement – Procurement under £10k Complete 0 1 1 Satisfactory Non-Domestic Rates (Limited scope) Complete 0 3 4 Satisfactory
Page 13
Grading definitions: Grade Definition Strong In our opinion there is a sound system of internal controls designed to ensure that the organisation is able to achieve its objectives. Satisfactory In our opinion isolated areas of control weakness were identified which, whilst not systemic, put some organisation objectives at risk. Requires Improvement In our opinion systemic and/or material control weaknesses were identified such that some organisation objectives are put at significant risk. Unsatisfactory In our opinion the control environment was considered inadequate to ensure that the organisation is able to achieve its objectives. Report Title Status Findings Control Environment Opinion Red Amber Green Education Control Self- Assessment Complete 0 3 1 Satisfactory HSCP – Imprest Complete 0 2 2 Satisfactory