Page 1

Agenda 
Audit Committee
Date:  Wednesday, 18 February 2026 
Time:  10:00 
Venue:   Council Chamber, Clydebank Town Hall, 5 Hall Street,
Clydebank G81 1UB 
Contact: Carly Chisholm, Committee Officer 
carly.chisholm@west-dunbarton.gov.uk 
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Audit Committee as detailed above.
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive  
Page 1

Page 2

Distribution: 
Councillor Gordon Scanlan (Chair)
Councillor Sophie Traynor (Vice Chair)
Councillor Ian Dickson
Councillor Michelle McGinty
Councillor John Millar
Councillor Lauren Oxley
Councillor Martin Rooney 
Councillor Clare Steel 
All other Councillors for information 
Chief Executive
Chief Officers 
Date of Issue: 5 February 2026
Page 2

Page 3

AUDIT COMMITTEE
WEDNESDAY, 18 FEBRUARY 2026 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
3 MINUTES OF PREVIOUS MEETINGS     
Submit for approval, as a correct record, the Minutes of Meeting of the Audit
Committee held on 10 December 2025.   
4 OPEN FORUM 
The Committee is asked to note that no open forum questions have been submitted
by members of the public. 
5 INTERNAL AUDIT PLAN 2025/26        9 - 27 
PROGRESS TO 31 DECEMBER 2025  
Submit report by Chief Officer – Resources advising of progress to 31 December
2025 against the Internal Audit Plan for 2025/26.   
6 BEST VALUE THEMATIC REPORT –       29 - 52             
TRANSFORMATION    
Submit report by Chief Officer – Resources to advise Members of the outcome of the
External Auditor’s Best Value Thematic Review for 2024/25 and to provide a
summary of the key points arising. 
7        STRATEGIC RISK 2022-2027        53 - 77   
Submit report by Chief Officer – People and Technology to provide an update         
on the strategic risks for 2022-27. 
___________________________________________________________________ 
Page 3
5 - 8

Page 4

Page 4

Page 5

AUDIT COMMITTEE
At a Meeting of the Audit Committee held in Civic Space, 16 Church Street,
Dumbarton on Wednesday, 10 December 2025 at 2.03 p.m.
Present: Councillors Ian Dickson, Michelle McGinty, John Millar, Lauren
Oxley, Martin Rooney, Gordon Scanlan, and Sophie Traynor.
Attending:  Peter Hessett, Chief Executive; Laurence Slavin, Chief Officer –
Resources; Andi Priestman, Shared Service Manager – Audit
and Fraud; Julie Slavin, Chief Financial Officer – HSCP; Victoria
Rogers, Chief Officer – People and Technology; Amanda
Graham, Chief Officer – Citizen, Culture and Facilities; Carol
Alderson, Finance Manager; Gillian Hamilton, Chief Education
Officer; Gail MacFarlane, Chief Officer – Roads and
Neighbourhood; Caleb Ogouche, External Auditor – Forvis
Mazars; Andrew Brown, Education Service Manager; Craig
Wilson, Building Services Manager; Stephen Daly, Citizen and
Digital Manager; and Lynn Straker, Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Councillor
Clare Steel.
Councillor Gordon Scanlan in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Audit Committee held on 24 September 2025 were
submitted and approved as a correct record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
ITEM 3
Page 5

Page 6

INTERNAL AUDIT PLAN 2024/25 PROGRESS TO 31 OCTOBER 2025
A report was submitted by the Chief Officer – Resources advising of progress to 31
October 2025 against the Internal Audit Plan for 2024/25.
After discussion and having heard the Shared Service Manager – Audit and Fraud in
further explanation and in answer to Members’ questions, the Committee agreed to
note the content of the report.
2025/26 INTERNAL AUDIT ANNUAL STRATEGY AND PLAN
A report was submitted by the Chief Officer – Resources advising on the planned
programme of work for the Internal Audit Section for the year 2025/26.
After discussion and having heard the Shared Service Manager – Audit and Fraud in
further explanation and in answer to Members’ questions, the Committee agreed to
approve the 2025/25 Audit Plan.
FORVIS MAZARS - 2024/25 ANNUAL AUDIT PLAN
A report was submitted by the Chief Officer – Resources presenting the Forvis
Mazars Annual Audit Plan for the year ending March 2025. 
After discussion and having heard the Chief Officer – Resources and External
Auditor in further explanation and in answer to Members’ questions, the Committee
agreed to note 2024/25 Forvis Mazars Annual Audit Plan.
PUBLIC INTEREST DISCLOSURES AND OTHER INTERNAL AUDIT
INVESTIGATIONS 1 APRIL TO 31 OCTOBER 2025
A report was submitted by the Chief Officer – Resources advising on the outcome of
investigations into allegations and disclosures in line with public interest disclosure
and business irregularities policies received by Internal Audit between 1 April and 31
October 2025.
After discussion and having heard the Chief Officer – Resources, the Chief Officer –
People and Technology, the Chief Officer – Roads and Neighbourhood and the
Shared Service Manager – Audit and Fraud in further explanation and in answer to
Members’ questions, the Committee agreed to note the content of the report. 
SCOTTISH PUBLIC SERVICES OMBUDSMAN COMPLAINTS REPORT 
2024-2025
A report was submitted by the Chief Officer – Citizen, Culture and Facilities
presenting the Scottish Public Services Ombudsman (SPSO) report on complaints
handling by West Dunbartonshire Council for the year 1 April 2024 - 31 March 2025.
Page 6

Page 7

After discussion and having heard the Shared Service Manager – Audit and Fraud,
the Citizen and Digital Manager and the Building Services Manager in further
explanation and in answer to Members’ questions, the Committee agreed to note the
contents of the report and the ongoing commitment at a service and strategic level to
monitor complaints and ensure compliance with Scottish Public Services
Ombudsman (SPSO) timelines. 
TREASURY MANAGEMENT MID-YEAR REPORT 2025/2026
A report was submitted by the Chief Officer – Resources providing an update on
treasury management to 30 September 2025.
After discussion and having heard the Finance Manager in further explanation and in
answer to Members’ questions, the Committee agreed:-
(1) to note the treasury management stewardship information within the
appended report; 
(2) to approve the 2025/26 revised estimates of treasury and prudential indicators
as advised within the appended report (Tables A, B, C, D, E, F, H, L and N);
and
(3) to remit the 2025/26 Treasury Management Mid-Year Report to full Council for
approval. 
ACCOUNTS COMMISSION REPORT – AUDIT OF GLASGOW CITY COUNCIL
SENIOR OFFICER EXIT PACKAGES
A report was submitted by the Chief Officer – People and Technology providing
detail on West Dunbartonshire Council’s response to the recommendations arising
from a recent Controller of Audit’s report to the Accounts Commission on
governance and transparency of decision making of exit packages of senior officers
in Glasgow City Council.
After discussion and having heard the Chief Officer – People and Technology in
further explanation and in answer to Members’ questions, the Committee agreed:-
(1) to note the Council’s responses to each recommendation in the Accounts
Commission letter;
(2) that the current approach to the governance of exit packages, in particular
those involving senior officers, is sufficient;
(3) that the Council’s Scheme of Delegation should be subject to review; and 
(4) to note the revisions to the Code of Conduct as set out in paragraph 4.7 of the
report.
Page 7

Page 8

EXTERNAL AUDIT ENQUIRIES – 2024/25 ACCOUNTS
A report was submitted by the Chief Officer – Resources informing of External
Audit’s requirement for the provision of information regarding the Council’s approach
to dealing with fraud, litigation, laws and regulations as part of their audit of the
Council’s 2024/25 Statement of Accounts and 2024/25 Trust Accounts.
After discussion and having heard the Chief Officer – Resources in further
explanation, the Committee agreed:-
(1) the enquiries for those charged with governance for the 2024/25 Council
Accounts and 2024/25 Trust Accounts; and
(2) to approve the submission of the draft responses set out in appendix 1 of the
report for the Council and appendix 2 of the report for the Trust Funds to the
Council’s external auditors. 
The meeting closed at 2.53 p.m.
Page 8

Page 9

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources
Audit Committee - 18 February 2026
Subject: Internal Audit Plan 2024/25 – Progress to 31 December 2025
1. Purpose
1.1 The purpose of this report is to advise Members of progress to 31 December
2025 against the Internal Audit Plan for 2025/26. 
1.2 The report also advises Members of:
 recently issued Internal Audit reports and action plans
 the status of implementation progress relating to action plans from previously
issued Internal Audit reports.
2. Recommendations
2.1 It is recommended that Members note the contents of this report.
3. Background
3.1 The annual audit plan for 2025/26 was approved by the Audit Committee on 10
December 2025.  This report provides information on the progress in
implementing the plan.
3.2 When audit reports are issued by Internal Audit, an action plan is agreed with
management in relation to issues highlighted by the audit report.  Progress on
implementing the actions is monitored by Internal Audit on a monthly basis and
reported to the Audit Committee.
4. Main Issues
4.1. The annual audit plan sets out the audit coverage for the year utilising available
staff resources to enable the Shared Service Manager – Audit & Fraud to provide
the annual internal audit opinion regarding the adequacy and effectiveness of
internal control within the Council.
4.2 In accordance with the risk-based audit methodology, for each audit, one of four
audit opinions is expressed:
Strong In our opinion there is a sound system of internal
controls designed to ensure that the organisation is
able to achieve its objectives. 
Satisfactory In our opinion isolated areas of control weakness
were identified which, whilst not systemic, put
some organisation objectives at risk. 
ITEM 5
Page 9

Page 10

Requires Improvement In our opinion systemic and/or material control
weaknesses were identified such that some
organisation objectives are put at significant risk.
Unsatisfactory In our opinion the control environment was
considered inadequate to ensure that the
organisation is able to achieve its objectives.
4.3 Detailed findings and recommendations reported to management are graded using
the following criteria:   
Red In our opinion the control environment is insufficient to address the
risk and this could impact the Council as a whole.
Corrective action must be taken and should start immediately.
Overseen to completion by Corporate Management Team.
Amber In our opinion there are areas of control weakness which we consider
to be individually significant but which are unlikely to affect the
Council as a whole.
Corrective action must be taken (some exceptions may be agreed
with Internal Audit) within reasonable timeframe.
Overseen to completion by Chief Officer/Head of Service.
Green In our opinion the risk area is well controlled or our audit highlighted
areas for minor control improvement and/or areas of minor control
weakness.
Process improvements/efficiencies may be actioned at management
discretion in consultation with Internal Audit.
Managed by service owner.
Not reported in Audit Committee papers.
4.4 There were no audit reviews finalised since the December 2025 Audit Committee. 
Due to ongoing vacancies within the team, risk-based audits are being prioritised
until the vacancies are filled which is anticipated by May 2026.
4.5 In relation to audit work for the Integration Joint Board, planning is now underway
for the 2025/26 audit plan.
4.6 In relation to the Valuation Joint Board, planning for the 2025-26 audit has not yet
started.
4.7 In relation to the Leisure Trust, planning for the 2025-26 audit has not yet started.
4.8 Internal Audit Action Plans
In relation to audit action plans, these are monitored by Internal Audit on a monthly
basis.  The status report at 31 December 2025 is provided at Appendix 2.
Ongoing Corporate Fraud Team Work
4.9 The Corporate Fraud team’s day to day work continues to focus on referrals relating
to council tax reduction/single person discounts, joint working with DWP in relation
to housing benefit and council tax reduction, referrals relating to housing tenancies
and investigating relevant national fraud initiative matches.
Page 10

Page 11

4.10 The Internal Audit Team and the Corporate Fraud Team continue to work together
as appropriate in order to ensure a joined-up approach to fraud investigation and
detection for example in relation to whistleblowing enquiries.
National Fraud Initiative
4.11 The National Fraud Initiative is a series of biennial exercises run by the Cabinet
Office and Audit Scotland to identify or prevent fraud and error by matching
electronic data held by public bodies. Participating bodies are required to
investigate data discrepancies within a set timescale and report back on any
savings.
4.12 In relation to the 2024 exercise, a significant number of matches have been
received in relation to a range of datasets including Housing Benefit, Council Tax
Reduction, Payroll, Business Rates, Creditors and Blue Badges.  High risk matches
have been prioritised for investigation and progress is as follows:
Matches
Received
Number
Investigated
Number
in
Progress
No
Issue
Fraud
(1)
Error
(2)
Value of
Fraud/Error
9727 827 26 637 83 81 £167,544.59
Movement since last committee (December 2025)
+15 +24 +5 +24 +4 +1 +£10,148.00
(1) Fraud relates to:
80 CTR cases where income was not fully declared.  Recovery is in
progress;
1 Housing Benefit case where income was not fully declared.  Recovery is in
progress; and
2 cases of tenancy fraud.  Properties have been recovered.
(2) Errors relate to:
80 blue badges which had not been cancelled on the system; and
1 case where CTR was not updated in relation to a deceased case.
Benchmarking
4.13 In accordance with the Council’s Strategic Improvement Framework, the
Council’s Internal Audit service continues to be part of a benchmarking group
which involves a number of neighbouring Councils.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 The Corporate Fraud Team activity can result in actual recoveries, charges and
re-billings.  The total amount of actual recoveries, charges and re-billings
identified will be included in the Internal Audit Annual Report and Assurance
Statement for 2025-26.
6.2 There are no procurement implications arising from this report.
Page 11

Page 12

7. Risk Analysis
7.1 There is a risk that failure to deliver the Internal Audit Plan would result in an
inability to provide a reasonable level of assurance over the Council’s system of
internal financial control to those charged with governance.  The main basis for
providing assurance is coverage of the planned risk-based audits.  Every
endeavour is made to ensure that no material slippage occurs in risk-based
audits by concentrating resources on these audits.
8. Equalities Impact Assessment (EIA)
8.1 There are no direct equalities impacts arising from the report however where an
agreed action results in a change in process this will be considered for equalities
impact by the relevant service.
9. Consultation
9.1 This report has been subject to consultation with appropriate Chief Officers.
10. Strategic Assessment
10.1 This report helps ensure strong governance and will help support delivery of the
Council Plan, and in particular priority 4: Inclusive and Adaptable, with the Council
seeking to provide high quality and adaptable services that deliver value for money.
....................................
Laurence Slavin
Chief Officer - Resources
Date: 21 January 2026
Person to Contact: Andi Priestman, Lead Internal Auditor
E-mail: andi.priestman@west-dunbarton.gov.uk
Appendices: 2025/26 Annual Audit Plan – Progress to 31 December 2025
(Appendix 1)
Status of Internal Audit Action Plans at 31 December 2025
(Appendix 2)
Internal Audit Reports - Copies available on request
Wards Affected: All wards
Page 12

Page 13

2025-2026 Internal Audit Annual Audit Plan – Progress to 31 December 2025
Audit/Status Not
Started
Planning Fieldwork Fieldwork
Complete
Draft
Report
Final
Report
Date Reported to
Audit Committee
Risk-Based Reviews
Budgetary Control 
Care at Home – Delayed Discharge
Arrangements

Estates – Commercial and Industrial Properties
Rent and Leases

Regularity Audits
Payroll High Earners – Quarterly Review Quarterly exercise is underway.
Section Payments (HSCP) Not started.
Education Control Self-Assessment Exercise Not started.
Corporate Purchase Cards – Quarterly Checks Not started.
Other Work
Integration Joint Board – Internal Audit Service Planning for the 2025/26 audit is underway.
Valuation Joint Board – Internal Audit Service The 2025/26 audit has not started.
Leisure Trust – Internal Audit Service The 2025/26 audit has not started.
National Fraud Initiative Matches for the 2024 Exercise have now been received and investigations are underway. 
Completion of 24/25 Audit Plan Draft report being prepared for Regulated Procurement – Compliance audit.
ITEM 5 
APPENDIX 1
Page 13

Page 14

Page 14

Page 15

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLANS
AT 31 DECEMBER 2025
Summary: Section 1 Summary of Management Actions due for completion
by 31/12/2025
There were 11 actions due for completion between 1
October and 31 December 2025, 6 of which have been
reported as completed by management and the completion
date for 4 actions has been revised.  For 1 action, a revised
completion date requires to be set.
In addition, management have reported that 3 actions due
for completion by 31 March 2026 have also been
completed.
Section 2 Summary of Current Management Actions Plans at
31/12/2025
At 31 December 2025 there were no audit reports delayed
due to management not finalising the action plan within
agreed timescales.
Section 3 Current Management Actions at 31/12/2025
At 31 December 2025 there were 18 current audit action
points. 
Section 4 Analysis of Missed Deadlines
At 31 December 2025 there were 10 audit action points
where the original agreed deadline has been missed.
Section 5 Summary of Action Plan Points by Audit Year
ITEM 5 APPENDIX 2
Page 15

Page 16

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
SUMMARY OF ACTION PLANS DUE FOR COMPLETION BY 31.12.2025
SECTION 1
Strategic Area
No. of
Actions
Due
No. of
Actions
Completed
Deadline
missed
Revised Date
set*
Revised Date
required to be
set*
Roads and Neighbourhood 1 1
Housing 10 6 4
Total 11 6 4 1
* These actions are included in the Analysis of Missed Deadlines – Section 4
Page 16

Page 17

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
SUMMARY OF CURRENT ACTION PLANS AT 31.12.2025
SECTION 2
CURRENT ACTIONS BY STRATEGIC AREA
Roads and Neighbourhood
Completion date to be advised 1
Total Actions 1
Education
Due for completion June 2026 1
Total Actions 1
Housing & Employability
Due for completion February 2026 2
Due for completion March 2026 2
Due for completion June 2026 7
Due for completion July 2026 3
Due for completion August 2026 1
Due for completion September 2026 1
Total Actions 16
Total current actions: 18
Page 17

Page 18

Page 18

Page 19

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Current Internal Audit Action Plans
CSA Education Procedures (Report Issued May 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/231
Adequacy of School Fund Procedures
A review of the procedures will be undertaken and updated to reflect up to date practice and provide
sufficient guidance to staff involved in maintaining and managing school funds.
A copy of the updated school fund procedures will be disseminated to Heads of establishments.
31-Mar-2025 30-Jun-2026
Senior
Education
Officer
Chief Officer –
Education,
Learning and
Attainment
UK Shared Prosperity Fund Assurance Review (Report Issued June 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/237
Inadequate policies and procedures to support closure of the fund (Amber)
The UK Shared Prosperity Fund is transitioning to a Local Growth Fund.  Plans are being developed
at a regional level at which point Officers will be able to review any workforce and financial
implications.
WDC has a full set of HR policies relating to staff terms and conditions and processes for dealing
with the loss of funding which will be implemented where required.
31-Dec-2024 To be advised
Chief Officer
Roads and
Neighbourhood Chief Executive
Page 19

Page 20

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Void Management (Report Issued May 2025)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/255
/3
Adequacy of Tenant Rechargable Repairs Process (Amber)
Review recharge process to include guidance for staff to follow should previous tenant query/
dispute recharge amount invoiced for and be incorporated into Void Procedure and Recharge
processes. 30-Jun-2025 28-Feb-2026
Maintenance
Manager/
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/255
/4
Adequacy of Tenant Rechargable Repairs Process (Amber)
Design and implement new PowerBi clear out report. 31-Aug-2025 31-Dec-2025
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/256
/3
Adequacy of Job Costing Process (Amber)
Continue to report void management data at appropriate forums including Building Services Board. 31-Mar-2026 31-Mar-2026
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/258
/3
Ensuring Value for Money when using external contractors (Amber)
If appropriate arrange and carryout a full tender exercise to engage a void property contractor from
an existing framework or arrange an open tender exercise. 30-Nov-2025 30-Nov-2025
Contracts
Manager Chief Officer
Housing and
Employability
Page 20

Page 21

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Housing Repairs and Maintenance (Report Issued May 2025)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/263
/1
Adequacy of Housing Client Function (Red)
Carry out a review of the Client Function to identify any areas that require improvement to ensure
quality, value for money repair and maintenance services are provided.
31-Jul-2025 30-Jun-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/2
Adequacy of Housing Client Function (Red)
Implement any necessary Client Function changes identified. 31-Mar-2026 30-Jun-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/3
Adequacy of Housing Client Function (Red)
Develop Building Services 2025/2026 improvement action plan to include appropriate financial
management, service costs recovery and budget management actions.
30-Jun-2025 30-Jun-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/4
Adequacy of Housing Client Function (Red)
Present Building Services 2025/2026 improvement action plan to the Building Service Board for
approval.
30-Jun-2025 30-Jun-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/5
Adequacy of Housing Client Function (Red)
Complete actions within Building Services 2025/2026 action plan. 31-Mar-2026 30-Jun-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/6
Adequacy of Housing Client Function (Red)
Carry out a review of variation procedure and authorisation limits and implement any necessary
changes ensuring robust procedures are in place and provide value for money services. 30-Jun-2025 31-Dec-2025
Contracts Co-
ordinator/
Support Services
Co-ordinator
Chief Officer
Housing and
Employability
IAAP/265
/1
Adequacy of Stock Control Procedures (Amber)
Complete the procurement of an appropriate barcoding hardware and software solution. 30-Jun-2025 30-Jun-2026
Contracts
Manager
Chief Officer
Housing and
Employability
IAAP/265
/2
Adequacy of Stock Control Procedures (Amber)
Implement the procurement of an appropriate barcoding hardware and software solution. 31-Jul-2026 31-Jul-2026
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
Page 21

Page 22

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/265
/3
Adequacy of Stock Control Procedures (Amber)
Present a decision paper to the IHMS Project Board to approve development of the automatic
reordering module.
30-Jun-2025 30-Sep-2026
IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/265
/4
Adequacy of Stock Control Procedures (Amber)
Following approval, complete necessary work implement, test and go live on QL system. 31-Aug-2026 31-Aug-2026
IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/265
/5
Adequacy of Stock Control Procedures (Amber)
Fully implement phase 2 of the review of Building Services structure in warehouse services. 31-May-2025 28-Feb-2026
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/266
/1
Lack of Recovery Plan to reduce overspend (Amber)
Develop a cost recovery plan for 2025/2026 and gain approval of the plan from the Building
Services Board.
30-Jun-2025 31-Dec-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/266
/2
Lack of Recovery Plan to reduce overspend (Amber)
Complete actions in the cost recovery plan for 2025/2026 reporting progress at the Building
Services Board and other appropriate forums.
31-Mar-2026 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/266
/3
Lack of Recovery Plan to reduce overspend (Amber)
Drive down tenant and resident reactive repair demand in line with the criteria within the new
repairs policy.
31-Mar-2026 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/267
/4
Adequacy of monitoring of Schedule of Rates for Specifying and Controlling Repairs &
Maintenance Work (Amber)
Reduce the average percentage of variation on non emergency reactive repairs by 5% in 2025/2026
compared the level in 2024/2025.
31-Mar-2026 31-Mar-2026
Maintenance
Manager Chief Officer
Housing and
Employability
IAAP/269
/1
Inefficient Allocation of Resources (Amber)
Include an action in the Building Services 2025/2026 improvement action plan to have an effective
imprest stock provision in place.
30-Jun-2025 31-Dec-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/269
/2
Inefficient Allocation of Resources (Amber)
Develop alternative scheduling and appointment system to replace DRS. 31-Jul-2025 31-Jul-2026
IHMS Change
Officer
Chief Officer
Housing and
Employability
Page 22

Page 23

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/269
/4
Inefficient Allocation of Resources (Amber)
Implement new scheduling and appointment system. 30-Sep-2025 31-Jul-2026
Building Services
Manager/IHMS
Change Officer
Chief Officer
Housing and
Employability
IAAP/271
/2
Adequacy of Monitoring of Vehicle Usage (Amber)
Continue to monitor automated reports from webfleet system and take appropriate action in line
with Fuel Emission and Tracking Protocol and appropriate Council policies. 31-Mar-2026 31-Mar-2026
Maintenance
Manager/
Contracts
Manager
Chief Officer
Housing and
Employability
IAAP/273
/2
Lack of Standard Operating Procedure Manual (Amber)
Develop and add any necessary procedures and processes to procedures file within the x-drive. 31-Dec-2025 31-Dec-2025
Maintenance Co-
ordinators
Chief Officer
Housing and
Employability
IAAP/274
/3
Compliance with HMRC Benefit in Kind Guidelines (Amber)
Carry out a review of the homestart protocol with workforce, TUs and transport service ensuring
this remains fit for purpose.
31-Jan-2026 30-Jun-2026
Maintenance
Manager/Project
s Manager
Chief Officer
Housing and
Employability
Page 23

Page 24

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
ANALYSIS OF MISSED DEADLINES AT 31.12.2025
SECTION 4
Status Key
On track Complete
Overdue – update required Missed original due date
–new date set
Report Agreed Action Original Due
Date
Revised Date Management Comments
CSA Education
Procedures (May
2024)
Adequacy of School Fund Procedures
A review of the procedures will be undertaken and
updated to reflect up to date practice and provide
sufficient guidance to staff involved in maintaining
and managing school funds.
A copy of the updated school fund procedures will
be disseminated to Heads of establishments.
31-Mar-2025
31-May-2025
30-Sep-2025
30-Jun-2026 The policy was initially drafted in June 2025, however, the policy
requires to be updated to reflect updates to other education policies
before disseminating to Heads of Establishment which will be done by
the end of the school year.
Void Management
(May 2025)
Adequacy of Tenant Rechargable Repairs
Process (Amber)
Review recharge process to include guidance for
staff to follow should previous tenant
query/dispute recharge amount invoiced for and
be incorporated into Void Procedure and Recharge
processes.
30-Jun-2025
31-Aug-2025
31-Dec-2025
28-Feb-2026 Review is now complete and rollout will be completed by 28 February
2026.  This action has been delayed due to conflicting priorities.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Carry out a review of the Client Function to
identify any areas that require improvement to
ensure quality, value for money repair and
maintenance services are provided.
31-Jul-2025
31-Dec-2025
30-Jun-2026 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Develop Building Services 2025/2026
improvement action plan to include appropriate
financial management, service costs recovery and
budget management actions.
30-Jun-2025
31-Dec-2025
30-Jun-2026 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Present Building Services 2025/2026 improvement
action plan to the Building Service Board for
approval.
30-Jun-2025
31-Dec-2025
30-Jun-2026 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Housing Repairs and
Maintenance (May
2025)
Inefficient Allocation of Resources (Amber)
Develop alternative scheduling and appointment
system to replace DRS.
31-Jul-2025 31-Jul-2026 Go live date revised to July 2026.  Agreed that this was required due to
testing, training and implementation required
Page 24

Page 25

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
ANALYSIS OF MISSED DEADLINES AT 31.12.2025
SECTION 4
Status Key
On track Complete
Overdue – update required Missed original due date
Report Agreed Action Original Due
Date
Revised Date Management Comments
Housing Repairs and
Maintenance (May
2025)
Inefficient Allocation of Resources (Amber)
Implement new scheduling and appointment
system.
30-Sep-2025 31-Jul-2026 Go live date revised to July 2026.  Agreed that this was required due to
testing, training and implementation required
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Fully implement phase 2 of the review of Building
Services structure in warehouse services.
31-May-2025
01-Aug-2025
28-Feb-2026 It has been necessary to extend completion date due to delays within
Job Evaluation in terms of reviewing the role profile of warehouse
assistant.  
The posts are only now becoming available for recruitment.  This should
be completed through SWITCH and any necessary recruitment by the
end of February 2026.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Complete the procurement of an appropriate
barcoding hardware and software solution.
30-Jun-2025 30-Jun-2026 In-house option being taken forward and target set for June 2026.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Present a decision paper to the IHMS Project
Board to approve development of the automatic
reordering module.
30-Jun-2025
31-Dec-2025
30-Sep-2026 The action requires to be re-evaluated and a review undertaken of
available packages.
Page 25

Page 26

Page 26

Page 27

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLANS
SUMMARY OF ACTIONS BY AUDIT YEAR SECTION 5
Status at 31 December 2025
Current actions by GradeAudit Year No of Agreed
Actions
No of actions
complete Red Amber Green*
2020/2021 25 25 0 0 0
2021/2022 51 50 0 0 1
2022/2023 51 48 0 0 3
2023/2024 62 48 0 2 12
2024/2025 80 52 5 11 13
Total 269 222 5 13 29
* Green actions are within the Council’s risk appetite and are therefore not included in
Audit Committee reports.
Page 27

Page 28

Page 28

Page 29

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Resources 
Audit Committee - 18 February 2026 
Subject:  External Audit Report Best Value Thematic Report -
Transformation 
1. PURPOSE 
1.1 To advise Members of the outcome of the External Auditor’s Best Value
Thematic Review for 2024/25 and to provide a summary of the key points
arising. 
2. RECOMMENDATIONS 
2.1 Members are asked to note the content of this report and the attached
external audit report. 
3. BACKGROUND 
3.1 Under the Code of Audit Practice, the audit of Best Value in councils is fully
integrated within the annual audit work performed by appointed auditors and
their teams. Auditors are required to evaluate and report on the performance
of councils in meeting their Best Value duties. 
3.2 External Audit also conduct thematic reviews as directed by the Accounts
Commission. In 2024/25 this direction focused on transformation and how
councils are redesigning and delivering more efficient services to achieve
planned outcomes. 
3.3 This report presents the external auditor’s conclusions on this work. 
4. MAIN ISSUES 
4.1 Page 3 of the report provides the auditors summary of judgements for each
section of the report with further information provided in the body of the report
to evidence those judgements 
4.2 Appendix 1 to the report (pages 16 and 17 of the report) detail the two issues
identified and the Chief Executive’s agreed actions and associated timescales.
Appendix 2 to the report confirms that previously agreed Best Value Thematic
Report findings have been completed. 
4.3 A representative of the external audit team will be in attendance at the Council
meeting to present their report. 
ITEM 6
Page 29

Page 30

5. PEOPLE IMPLICATIONS 
5.1 There are no personnel issues. 
6. FINANCIAL AND PROCUREMENT IMPLICATIONS 
6.1 There are neither financial nor procurement implications with this report. 
7.  RISK ANALYSIS 
7.1 No risk analysis is not required. 
8. EQUALITIES IMPACT ASSESSMENT (EIA) 
8.1 There is no requirement to undertake an equality impact screening. 
9. CONSULTATION 
9.1 The report has been subject to consultation with appropriate Chief Officers. 
10. STRATEGIC ASSESSMENT 
10.1 The report is in relation to a statutory function. It does not directly affect any of
the Council’s strategic priorities. 
Laurence Slavin
Chief Officer - Resources
Date:   30 January 2026 
Person to Contact: Laurence Slavin, Chief Officer - Resources 
E-mail: laurence.slavin@west-dunbarton.gov.uk 
Appendices:
Appendix 1 – External Audit Report: Best Value Thematic Work on the West
Dunbartonshire Council 2024/25 
Wards Affected: All 
Page 30

Page 31

Transformation: how councils are
redesigning and delivering more efficient
services to achieve planned outcomes
Best Value thematic work 
West Dunbartonshire Council 2024-25 
January 2026 
ITEM 6
APPENDIX 1
Page 31

Page 32

Contents 
1) Key messages
2) Introduction
3) Transformation planning
4) Programme management
5) Partnership working and community engagement
6) Impact of transformation
Appendix 1 – Improvement Action plan
Appendix 2 – Follow up of previously reported Best Value findings for the Council 
Our reports are prepared in accordance with Terms of Appointment Letter from Audit Scotland dated
18 May 2022 through which the Accounts Commission has appointed us as external auditor of West
Dunbartonshire Council (the Council) for financial years 2022/23 to 2026/27. We undertake our audit
in accordance with Part VII of the Local Government (Scotland) Act 1973, as amended; and our
responsibilities as set out within Audit Scotland’s Code of Audit Practice 2021.
Reports and letters prepared by appointed auditors and addressed to 
the Council are prepared for the sole use of the Council and made available to Audit Scotland and the
Accounts Commission, the Controller of Audit. We take no responsibility to any member or officer in
their individual capacity or to any other third party.
Forvis Mazars LLP is the UK firm of Forvis Mazars, an international advisory and accountancy group.
Forvis Mazars LLP is registered by the Institute of Chartered Accountants in England and Wales. 
Page 32

Page 33

1) Key messages
Overview of engagement
A summary of the judgements we have made for each section is detailed below:
To what extent does the council have clear plans for transformation that link to its
priorities and support long-term financial sustainability? 
The council’s Strategic Plan outlines its commitment to service improvement and modernisation.
However, its transformation activity is based on individual projects rather than a consolidated
programme. This means it is difficult to measure the overall impact of transformation projects and their
contribution to the Council’s savings plans. Individual projects are generating savings and informing
budget options; however, the Council recognises they will not fully address its medium and long-term
financial challenges.
To what extent do the council’s programme management arrangements facilitate effective
oversight of its transformation plans?
The council has established governance structures for oversight of transformation projects. It has a
consistent corporate approach to project management. Senior officers receive regular updates on
transformation projects. Elected members are briefed primarily on savings delivery and do not have
oversight of wider transformation outcomes which limits their ability to fully assess the impact of
transformation projects.
The council’s Digital and Change teams have specialist skills and are well connected to national
networks. However, the council does not have sufficient resources to deliver transformation at the scale
and pace it desires.
To what extent are partners and communities involved in the development and delivery
of the council’s plans for transformation? 
The council works with partners to support transformation, particularly through Community Planning
West Dunbartonshire and collaboration with other councils and national bodies. This has enabled the
council to access external funding and shared expertise, strengthening its capacity to deliver complex
projects.
The council uses targeted consultation to involve residents and service users in shaping changes. It
shows awareness of the impact of transformation on vulnerable groups and has taken steps to mitigate
risks such as digital exclusion.
To what extent has the council considered the impact of its transformation activity,
including on vulnerable or protected groups? 
The council has established success measures for major transformation projects, but these are mainly
financial and operational. It tracks efficiency gains and cost savings, but there is limited reporting on
social outcomes or equality impacts. The council has demonstrated that individual transformation
projects deliver tangible benefits, but there is no consolidated corporate oversight and public
performance reporting on transformation benefits. 
Page 33

Page 34

2) Introduction
The 2023 Local Government Overview (LGO) notes that councils have never faced such a challenging
situation. Service demands have increased after the Covid-19 pandemic and funding is forecast to reduce
in real terms. Transformation, through greater collaboration with partners, will be key for councils to
deliver more sustainable service models in challenging financial climates.
This report sets out how the council is redesigning and delivering more efficient services to achieve
planned outcomes.
The Accounts Commission’s Strategy (2021-26) sets out its priorities to focus on inequalities, funding,
communities and recovery. The Code of Audit Practice sets out the Best Value work required to report
on these priorities.
This report covers the thematic aspect of the Best Value audit requirements. The Commission has
directed auditors to report on transformation and how councils are redesigning and delivering more
efficient services to achieve planned outcomes. In carrying out the work, auditors have considered the
following questions:
• To what extent does the council have clear plans for transformation that link to its priorities and
support long-term financial sustainability?
• To what extent do the council’s programme management arrangements facilitate effective
oversight of its transformation plans?
• To what extent are partners and communities involved in the development and delivery of the
council’s plans for transformation?
• To what extent has the council considered the impact of its transformation activity, including on
vulnerable or protected groups? 
An improvement action plan is included at Appendix 1 of this report. This sets out audit recommendations
in key areas, and the council’s planned response including responsible officers and dates for
implementation.
The coverage of the work is in line with the expectations for council’s arrangements for the seven Best
Value themes in the Local Government in Scotland Act 2003, Best Value Statutory Guidance 2020. 
Page 34

Page 35

3) Transformation planning
This section of the report examines to what extent, the council has clear plans for
transformation that link to its priorities and support long-term financial sustainability. 
Background
The council needs to ensure it can deliver sustainable services now and in the future, and difficult
decisions will need to be made to achieve this. The Accounts Commission’s Local government budgets
2024/25 briefing noted that councils’ cumulative funding gap between 2025/26 and 2026/27 is £780
million. This means that, cumulatively, councils need to identify and deliver recurring measures such as
savings or increased income of five percent of their overall revenue budget to be financially sustainable
in the short term.
Findings and evidence relating to the council’s transformation planning
Findings Evidence
Alignment of service
transformation to strategic
priorities 
The council’s Strategic Plan
outlines its commitment to 
service improvement and
modernisation, with strategic
priorities focused on
transformation. 
The council does not have a
standalone transformation
programme bringing together
all its transformation projects
and workstreams. This
means it is difficult to
measure the overall impact
of the Council’s
transformation work. See
Recommendation 1 within
the Improvement Action
Plan. 
• The council’s Strategic Plan 2022-2027 contains specific priorities
that focus on transformation. Priority 4 (Our Council – Inclusive
and Adaptable) commits to modernising services and improving
efficiency. This includes objectives such as “Deliver services that
are fit for the future” and “Maximise use of digital technology.”
• The ICT Strategy 2023-28 also sets out principles for digital
enablement, cloud adoption, and automation. 
• The 2024/25 Annual Report and Mid-Year Strategic Plan
Progress Reports provide performance updates against strategic
priorities, including digital service uptake and customer
satisfaction, but there is no stand-alone reporting on
transformation work. 
• The Council can demonstrate a link between transformation
initiatives such as automation, digital tenancy support, and
regeneration and its Strategic Plan outcomes, particularly under
the Our Council and Our Economy themes. Its capital investment
decisions are aligned with transformation objectives, as
evidenced by the Capital Strategy 2023/24–2031/32, which
prioritises projects that support service redesign and
sustainability.
• Transformation initiatives are  included in service-led projects and
as actions in corporate strategies such as the ICT Strategy and
People First Strategy. Governance is provided through corporate
boards, including the Transformation and Visioning Board.
Monitoring and reporting are focused on individual projects rather
than the complete programme of transformation work. 
Page 35

Page 36

Contribution of
transformation to long-
term financial
sustainability
The council’s transformation
projects are generating
savings and informing budget
options; however the council
recognises they will not fully
address its medium and
long-term financial
challenges. 
There is no consolidated
monitoring and reporting of
transformation costs and
savings. As a result, the
Council cannot demonstrate
a clear link between
transformation projects and
their contribution to achieving
long-term financial
sustainability. See
Recommendation 1 within
the Improvement Action
Plan.
• We confirmed through interviews with management in April 2025
that there is currently no dedicated transformation fund, this
previously existed but funding decisions are now based on
business cases and ability to generate efficiencies. Capital bids
are submitted for transformation work; for example, the new
accounting system is described as a major transformation
programme that will impact finance and wider council operations.
• The budget papers presented to Council in March 2025
highlighted that the council’s long-term financial sustainability will
rely heavily on service reductions, with limited transformation-led
benefits. 
• We reviewed the 57 individual savings options within the 25/26
Budget report and found that most of these were based on
reductions in three service areas: 
o Education service, including removal of secondary
school registration, reductions in teaching staff, and
scaling back transport and enrichment activities; 
o Cuts to roads, greenspace, and environmental
maintenance, such as reduced park maintenance, street
cleaning, footway gritting, and stopping weed-killing; 
o Community and leisure service reductions, including
closure or downsizing of facilities such as Dalmuir Golf
Course and bowling clubs, alongside reductions in
community engagement budgets and cultural services.
• This indicates that the council is continuing to close budget gaps
mainly by reducing services rather than through transformation., 
• The Council has acknowledged that its transformation projects
will not fully address the known and projected medium- to long-
term budget gaps. It expects these initiatives to contribute to
mitigating financial deficits rather than eliminating them.
Strategic performance and
outcome monitoring
The council has appropriate
arrangements for monitoring
and reporting performance
against its Strategic Plan
priorities, with detailed
updates on indicators linked
to transformation.
Annual and mid-year reports
provide clear updates on
progress, including
performance indicators,
achievements, and resident
feedback.
• The Annual Report 2024/25 states that the council met or
exceeded 60% of the 50 Strategic Plan indicators and
narrowly missed targets for a further 22% of indicators. 
• Performance against Strategic Plan indicators is an important
indicator for understanding whether the council’s service
change and improvement activity, including transformation, is
having the intended impact on outcomes. In the absence of a
consolidated transformation programme, the council’s
strategic performance framework is one of the few
mechanisms that demonstrates progress in areas linked to
transformation
• The council’s planned transformation savings are presented in
every Finance Update report and incorporated into its
Medium-Term Financial Strategy. As such, transformational
Page 36

Page 37

changes and savings are integrated within the Council’s
overall financial planning framework. 
• The 2024/25 mid-year progress report on the Strategic Plan
2022-27 provides detailed updates on indicators linked to
transformation priorities including digital service uptake and
customer satisfaction. 
• Savings options are included within the Council’s medium-
term financial plans including any relating to transformation
activities, these are also included in the five-year financial
plans presented to Council in Finance Update reports. 
Recommendations
We have identified one improvement recommendation as part of our work on the council’s
transformational planning. This recommendation has been included in the action plan at Appendix 1. 
Page 37

Page 38

4) Programme management 
This section of the report examines to what extent, the council’s programme management
arrangements facilitate effective oversight of its transformation plans. 
Background
It is essential that the council has good programme management arrangements in place to ensure it is
making sufficient progress against its transformation plans. It is important that the council has the
structures and the staffing resource in place to deliver its transformation ambitions. In addition, the council
must ensure that both senior officers and elected members have appropriate oversight of progress.
Findings and evidence relating to the council’s programme management
arrangements
Findings Evidence
Transformation governance 
The council has established
governance structures for
oversight of transformation
projects. These include the
Strategic Risk and Resilience
Strategic Reflective Review
Panel and the Transformation
and Visioning Board. It has a
consistent corporate approach
to project management, and
work is underway to implement
change management and
project management
methodologies. 
• Based on management responses, governance of
transformation projects is provided through the Strategic Risk
and Resilience Group (SRRG) and coverage at the Digital
Board and Innovation Board. These groups report on a bi-
monthly basis.
• The Strategic Plan 2022–2027 sets out governance and
scrutiny arrangements for strategic priorities. This would cover
any priority linked to ongoing transformation work , . This
demonstrates a degree of strategic oversight for some of the
transformation work underway.
• The Biannual Report on Strategic Risks presented to the Audit
Committee confirms oversight of governance and risk, including
transformation-related risks.
Resourcing and capacity to
deliver transformation 
The council’s Digital and
Change teams have specialist
skills and are well connected to
national networks. However,
these are small teams with
limited capacity. The council
does not have sufficient
resources to deliver
transformation at the scale and
pace it desires. See
Recommendation 2 within the
Improvement Action Plan.
• The council no longer maintains a dedicated transformation
fund, and resources are not specifically ring-fenced for
transformation projects. Historically, a transformation pot
existed, but this stopped due to financial constraints.
• Transformation delivery is currently managed through a
cascade approach using digital leads and champions across
service lines, rather than a fully resourced central team. While
this enables local ownership, the council acknowledges that
limited capacity in the small corporate digital transformation
team and fragmented service-led projects create risks of
duplication and inefficiencies. 
• Transformation work is increasingly being absorbed into day-to-
day responsibilities, particularly within ICT, due to cuts and
staffing shortages. This has constrained progress and created a
reliance on staff balancing transformation with operational
Page 38

Page 39

delivery. Senior Leadership Team oversight exists, but stronger
central coordination could improve consistency and pace of
implementation.
• The council has accessed external support from the Digital
Office, Improvement Service, and SOLACE, including training
opportunities, project tools, and access to the Microsoft
SharePoint 365 national hub.  Additional community-based
funding has been secured to address the digital gap and
promote inclusiveness, but this is targeted at outcomes rather
than internal capacity.
• National engagement continues, including participation in
Artificial Intelligence focused workstreams and digital council
collaboration groups, but resource constraints limit the Council’s
ability to fully exploit these opportunities.
Oversight and reporting to
senior leadership and
elected members
Senior leadership receives
regular updates on
transformation projects through
bi-monthly reports to the
Transformation and Visioning
Board, and financial
performance is monitored
through Budgetary Control
Reports. Elected members are
briefed primarily on savings
delivery, supplemented by
discussions at the Budget
Working Group and regular
updates from the Chief
Executive and Chief Officer -
Resources Officer. They do not
have oversight of wider
transformation outcomes which
limits their ability to assess the
full impact of transformation.
• The Transformation and Visioning Board receives updates on
progress, savings delivery, and key milestones for
transformation projects. These reports are supplemented by
input from the Finance and People and Change teams, which
monitor delivery against approved saving options. 
• Budgetary Control Reports provide detailed financial updates to
senior officers and committees, ensuring scrutiny of savings
performance. These reports are a primary mechanism for
tracking financial progress but do not include non-financial
benefits or transformation-specific KPIs. 
• Reporting to elected members occurs primarily through savings
options realised and Budgetary Control Reports presented to
relevant committees. Additional oversight is provided through
discussions at the Budget Working Group and weekly briefings
by the Chief Executive and S95 Officer to the Council Leader,
with periodic updates to other political group leaders.
• Officers explained that elected members currently lack visibility
of non-financial benefits and wider transformation outcomes,
which limits their ability to assess the full impact of
transformation beyond financial savings. This has been partially
addressed by actions taken by management in response our
previous recommendations, see Appendix 1 of this report.
Recommendations
We have identified one improvement recommendation as part of our work on the council’s programme
management. This recommendation has been included in the action plan at Appendix 1. 
Page 39

Page 40

5) Partnership working and community engagement 
This section of the report considers to what extent are partners and communities involved in
the development and delivery of the council’s plans for transformation.
Background
The Best Value in Scotland report noted that councils must now rethink how they work together, and
with local partners and communities, to provide financially sustainable services. Few councils provide
services jointly or share support services across different councils to a great extent.
Findings and evidence relating to the council’s partnership working and community
engagement arrangements
Findings Evidence
Partnership working to
deliver transformation
The council works with partners
to support transformation,
particularly through Community
Planning West Dunbartonshire
and collaboration with other
councils and national bodies.
This has enabled the council to
access external funding and
shared expertise, strengthening
its capacity to deliver complex
projects. 
• The council works closely with Community Planning West
Dunbartonshire (CPWD), which approved a themed approach
for 2024/25 focused on anti-poverty initiatives. This includes a
geographically targeted pilot project and the establishment of
the Family Prosperity Network, which brings together partners
from the third sector and employers to address child poverty.
This new theme and approach were selected in response to
feedback from individuals and community groups across the
local authority gathered by the council's Communities Team
and West Dunbartonshire Community and Volunteering
Services. This demonstrates that the Council and its partners
are using community feedback to help inform transformation
projects.
• The council  is in a Net Zero Cooperation Agreement with
Glasgow City Council, creating a framework for collaboration
on shared priorities such as electric waste vehicles, active
travel, and sustainability. This partnership aims to reduce
duplication and deliver financial savings through joint
workstreams. 
• The council successfully secured £19.9 million Levelling Up
Funding for three interlinked regeneration projects, including
Glencairn House, by highlighting partnership support and
external funding opportunities. See further details of this
included within Case Study 1 below.
• The Council participates in national initiatives such as the
Digital Office and SOLACE workstreams. These provide
access to tools, training, and collaborative forums on digital
transformation and Artificial Intelligence. 
• Interviews with officers confirmed that while partnership
working is strong at a strategic level, formal shared service
arrangements with other councils remain limited, reflecting a
sector-wide challenge.
Page 40

Page 41

Community engagement and
influence on service redesign
The council includes community
engagement within its
transformation approach, with
targeted consultation to involve
residents and service users in
shaping changes. Engagement
has influenced decisions in
areas such as catering services
and cultural regeneration.
However, this is often project-
specific rather than consolidated
under a corporate
transformation framework. 
• The council applies a service design approach with its Fit for
Future reviews, involving users in redesigning services. The
council has trained staff on service design. The council has
also established community of practice; this is a group of
individuals within the constituency who collaboratively engage
in promoting local interests or concerns.
•  Engagement with pupils and parents during the school
catering review informed changes to service delivery,
demonstrating responsiveness to user feedback. 
• The Glencairn House project (Case Study 1) involved
extensive consultation including online surveys and drop-in
sessions, with strong community support for the
redevelopment. Targeted engagement with seldom-heard
groups shaped design features such as accessibility and the
programme of activities offered. 
• The council conducts quarterly telephone satisfaction surveys
and uses a Citizens Panel to gather feedback on services, with
results reported to the Corporate Management Team and
published on the Public Performance Reporting pages on the
council’s website, promoting transparency. 
Consideration of vulnerable
groups and equalities in
transformation
The council shows awareness
of the impact of transformation
on vulnerable groups and has
taken steps to mitigate risks
such as digital exclusion.
Equality Impact Assessments
(EIAs) are carried out for major
projects, and targeted
engagement with seldom-heard
voices informs design decisions. 
• The Glencairn House Levelling Up Fund application included a
detailed Equality Impact Assessment (EIA), addressing
accessibility and inclusion. The design incorporated features
such as Braille signage, dementia-friendly audits, and
consultation with disability access panels. 
• The council participates in national digital inclusion initiatives
and has secured community-based funding to address the
digital gap. 
• In November 2024, CPWD approved a locality planning pilot in
Alexandria as part of its 2024/25 anti-poverty theme. The pilot
will bring together community planning partners and anchor
organisations to address priorities identified in the Leven
Locality Plan. This initiative demonstrates the Council’s place-
based approach to transformation by aiming to improve
outcomes for disadvantaged communities and strengthen
collaborative working.
• The council’s People First Strategy embeds equalities
considerations within workforce transformation, supporting
diversity and inclusion in organisational change. 
• While EIAs and targeted engagement are evident at project
level, programme-level reporting on equalities impacts is not
consolidated, limiting visibility for elected members and
external stakeholders.
Page 41

Page 42

Case study 1 
Glencairn House Library and Museum
Glencairn House is Dumbarton’s oldest building which is currently being transformed into a
state-of-the-art library, museum, and community hub at the heart of the High Street, with a children’s
library pavilion and garden. The project is one of three Levelling Up Fund (LUF) town-centre regeneration
projects totalling £19.9 million and includes targeted external funding and local investment. Work on site
began in April 2024, following contract award and procurement. Although scheduled for completion in the
Summer of 2025, work remains ongoing”
Process and Engagement
The council adopted a collaborative approach to design and delivery, working with specialist partners and
leveraging external funding to enhance capacity. Extensive community engagement shaped the project
from its inception. Early consultations in 2019–2021 included online surveys and public drop-in sessions,
which confirmed strong support for bringing Glencairn House back into public use. Some 238 residents
responded to an online survey, with 88% agreeing to the importance of seeing this historic building
brought back into use and 84% agreeing that it should remain in public ownership. 
In 2021, targeted consultations were held with Dumbarton-based community groups supporting young
people and seldom-heard groups. The aim was to explore how an expanded cultural offer could enable
future activities for these audiences. The organisations consulted collectively served around 650
individuals annually. These consultations influenced key design features, such as the inclusion of a
dedicated children’s library pavilion and accessible signage. Equality Impact Assessments were
embedded in the LUF application, with commitments to dementia-friendly audits and consultation with
disability access panels. Governance arrangements ensure progress is monitored through service
delivery plans and committee reporting, with milestones tracked under the council’s regeneration
programme.
Alignment with Best Value Principles
This project demonstrates the council’s commitment to partnership working and community engagement.
External collaboration enabled significant investment and technical expertise, while co-design ensured
the facility reflects local needs. Equalities considerations were integrated throughout, mitigating risks of
exclusion and supporting inclusive access. The project aligns with strategic priorities under the council’s
Strategic Plan, contributing to cultural regeneration, economic development, and community wellbeing. 
Recommendations
We have not identified any recommendations to report in respect of Partnership working and community
engagement as part of this thematic review.
Page 42

Page 43

6) Impact of transformation 
This section of the report assesses to what extent, the council has considered the impact of its
transformation activity, including on vulnerable or protected groups.
Background
It is important that the council has success measures in place to demonstrate the impact of its
transformational activity on service quality; outcomes for people who use services, inequalities and/or
savings.
Findings and evidence relating to the impact of the council’s transformation activity
Findings Evidence
Reporting on transformation
measures and outcomes 
The council has established
success measures for major
transformation projects, but
these are mainly financial and
operational. It tracks efficiency
gains and cost savings, but
there is limited reporting on
social outcomes or equality
impacts. 
See Recommendation 1 within
the Improvement Action Plan.
• The Strategic Plan and associated Delivery Plans include
performance indicators linked to transformation, but these
indicators largely focus on financial savings and operational
efficiency rather than broader social or equality outcomes. For
example, progress reports highlight savings options and
service redesign milestones but do not provide information on
community benefits or inclusion. 
• The Glencairn House regeneration project demonstrates
positive cultural and social outcomes, such as improved
access to learning resources, promoting local heritage, and
community cohesion. However, these benefits are reported at
a project level and are not integrated into a corporate
framework for measuring transformation impact. 
• Case Study 2 (Chatbot for Missed Bins) demonstrates clear
operational success measures including 1,367 calls avoided
over 17 weeks resulting in a financial saving of around
£20,000. Despite these operational improvements, there was
no assessment of wider service user experience or equality
impacts. For instance, equity of access, impact on complaint
resolution time across demographics, or if satisfaction was
sustained beyond the pilot period.
• The council completes EIAs for major projects, such as
Glencairn House, and incorporates these into funding
applications. However, we found no evidence of systematic
equality reporting across all its transformation initiatives.
• The council’s limited reporting on non-financial outcomes from
transformation projects means it is difficult to assess whether
transformation delivers broader benefits for communities.
Page 43

Page 44

Transformation benefits
The council has demonstrated
that individual transformation
projects deliver tangible
benefits, but there is no
consolidated corporate
oversight of transformation
benefits. 
See Recommendation 1 within
the Improvement Action Plan. 
• Case Study 2 provides strong evidence of benefits: call volume
reduction, efficiency gains in Waste services via “Agent
Assist”. The council has quantified time savings producing a
395% return on investment on a £4,000 pilot cost in 17 weeks.
These results indicate potential for this technology to be used
more widely across services, however there is no
programme-level approach to ensure such benefits are tracked
and validated. This would help the council assess whether
successful projects could be applied to other services. 
• The council has reported that the Integrated Housing
Management System has streamlined workflows, improved
data quality, and enabled mobile working, supporting service
delivery improvements. 
Public reporting on impact of
transformation projects
The council communicates
progress on transformation
through committee reports,
Strategic Plan updates, and the
Public Performance Reporting
pages of its website. There is no
consolidated public reporting on
transformation.
See Recommendation 1 within
the Improvement Action Plan.
• The Strategic Plan Mid-Year Progress report presents
performance indicators and trend analysis aligned to Strategic
Plan priorities. It does not cover the impact of transformation
work or provide an overall assessment of project outcomes.
• Case Study 2 provides internal evidence of impact such as
efficiency and satisfaction, but these pilot results do not appear
within any public-facing reporting that would allow residents
and elected members to see outcomes. 
• The council’s equality and social impact reporting is
project-specific (e.g. Glencairn EIA) and is not consolidated
into an overall report. Regular reporting on transformation
outcomes would improve transparency and allow the Council
to better communicate positive outcomes to stakeholders. 
Case study 2 
Chatbot Proof of Concept – missed bins  
West Dunbartonshire Council introduced a chatbot proof of concept in late 2023 to improve the process
for reporting missed bins. The initiative aimed to reduce high call volumes to the Contact Centre,
streamline case handling for Waste Services, and enhance customer experience through a self-service
digital channel. The pilot was designed as part of the council’s wider digital transformation agenda to
reduce demand on the Contact Centre, improve case management efficiency, and provide self-service
options that enhance user experience.
Prior to the chatbot pilot, residents reported missed bins through multiple channels, including online forms
and phone calls. The proof of concept aimed to streamline missed bin reporting and resolution via a
conversational interface (“Citizens Assist”), supported by “Agent Assist” for frontline Waste teams,
replacing paper-based processes with an auditable, real-time workflow. 
Page 44

Page 45

Process and Engagement
The project was scoped collaboratively with Contact Centre and Waste Services staff to map existing
processes and identify automation opportunities. The chatbot, developed with robotic process
automation, enabled residents to report missed bins and check status updates via a conversational
interface. To mitigate digital exclusion risks, assisted access was retained through the Contact Centre,
allowing staff to guide residents through the chatbot process. While the pilot included operational
engagement and promotion to residents, there was no formal Equality Impact Assessment or structured
engagement with vulnerable groups, highlighting a gap in post-implementation equality monitoring.
Alignment with Best Value Principles and Impact Theme
The pilot demonstrates innovation and efficiency, delivering measurable benefits with internal monitoring
data reporting:
• 1,367 calls avoided
• 1,523 cases updated with an average time saving of 10 minutes per intervention
• an estimated £20,000 time-value saving against a £4,000 cost (395% return on investment).
• Customer satisfaction averaged 3.6 out of 5, with 57% rating the service highly.
These outcomes align with Best Value principles of continuous improvement and financial
sustainability. In September 2024, the Council won the COSLA Excellence Award for Service Innovation
& Improvement for this project. 
Recommendations
We have identified improvement recommendations as part of our work on the council’s impact evaluation
of transformation. These recommendations have been included in the action plan at Appendix 1.
Page 45

Page 46

Appendices
Appendix 1 – Improvement Action plan 
The table below details the issues/risks that we have identified as part of this thematic review and our recommendations to the Council to address. 
Issue/risk Recommendation Agreed management action/ timing
1. Reporting Transformation Outcomes 
The council does not monitor and report on the overall
costs, savings and outcomes from its transformation
projects. There is also no consolidated public reporting
on transformation. 
Risk – The council cannot measure and demonstrate to
stakeholders how effectively it is delivering its service
improvement and modernisation strategic priorities. 
The council should review how it reports on
transformation to ensure it can clearly
demonstrate the costs, savings and
outcomes from transformation projects to
stakeholders. 
Management’s response
The Council will carry out a review of
current transformation reporting to ensure it
provides a balance between proving
sufficient information to stakeholders and
not creating an excessive demand on
limited resource.  Any identified changes to
current reporting will be implemented in the
2027/28 financial year.
Responsible officer
Chief Executive Officer
Implementation date
31 March 2027 
Page 46

Page 47

Issue/risk Recommendation Agreed management action/ timing
2. Resourcing and capacity to deliver transformation
The council’s Digital and Change teams have specialist
skills and are well connected to national networks.
However, these are small teams with limited capacity. 
Risk – The council does not have sufficient resources to
deliver transformation at the scale and pace it desires. 
The council should review whether it has
sufficient resources to achieve its service
improvement and modernisation priorities
and, if necessary, consider options for
increasing capacity. 
Management’s response
The Council has recently reviewed capacity
to support the delivery of transformation
and put in place funding to secure
additional capacity to support fit for future
reviews. 
Responsible officer
Chief Executive Officer
Implementation date
31 March 2026 
Page 47

Page 48

Appendix 2 – Follow up of previously reported Best Value findings for the Council 
We have followed up on previously reported Best Value Thematic Report findings, see the table below for the progress the Council has made during
2024/25.
Previously reported Best
Value findings 
Management
response and
implementation
timeframe
Work undertaken and judgements made in 2024/25 Conclusions reached
1. Workforce data – Level 2
The council could make better
use of the data available at
organisation and service level,
and through the workforce
planning console, to identify
future resource needs and
improve succession planning. 
Risk – The council is not able
to easily identify resource
gaps, through the workforce
planning console, and make
informed resourcing and
recruitment decisions. 
Recommendation – The
council should ensure
workforce data allows officers
to identify resource gaps and
supports succession planning. 
Management
Response: 
Action is agreed as
already part of planned
developments to
console. 
Implementation
timescale: 
March 2025 
Progress against the recommendation
During 2024/25, the council strengthened its workforce planning
arrangements by updating its Workforce Planning Toolkit, which
is a set of practical resources designed to help managers
forecast staffing and plan for future skills. The council also
introduced Succession Planning Guidance in February 2025,
which explains how to identify critical roles, assess successors,
and create development plans. This guidance was supported by
standard templates, including a succession planning status
sheet to record risks, readiness levels, and priority actions for
key posts.
The council launched Phase 1 of succession planning for senior
leadership roles in March 2025. This included issuing an
information pack to senior managers outlining the process,
timelines, and tools available, and providing support through
People & Change advisers.
In addition, the council enhanced its Workforce Planning
Console, the main digital system used by managers to access
real-time workforce data. New features added during the year
included:
Conclusions
Complete
The council has
implemented the core
elements needed to use
workforce data effectively
for identifying resource
gaps and supporting
succession planning.
Governance, tools, and
system improvements are
in place, and managers
are engaging with them.
Remaining enhancements
(such as predictive
analytics) are planned for
future phases of the work
programme. 
Page 48

Page 49

Previously reported Best
Value findings 
Management
response and
implementation
timeframe
Work undertaken and judgements made in 2024/25 Conclusions reached
• A tool to analyse voluntary severance and early
retirement trends
• Integration of training records and skills passports so
managers can see completed and outstanding learning
• A new Finance dashboard to support workforce cost
planning.
While these developments represent good progress, advanced
features such as automated workforce forecasting and predictive
analytics are still under development and not yet available for
routine use.
Training sessions were delivered to managers to improve
understanding and use of the console. Usage data shows a
significant increase, from an average of eight daily users in April
2024 to 31 by March 2025, indicating wider adoption across
services. 
Page 49

Page 50

Previously reported Best
Value findings 
Management
response and
implementation
timeframe
Work undertaken and judgements made in 2024/25 Conclusions reached
2. Hybrid and flexible
working policy – Level 3
The council’s flexible working
policy has been in place for
several years. Since then, the
way people work has changed
significantly with home and
hybrid working becoming
common. 
Risk – The council’s policy
does not fully reflect current
working practice. 
Recommendation – The
council should develop a new
flexible/hybrid working policy
or update its existing policy. 
Management
Response: 
Action is agreed as
already part of planned
policy review and will
likely only require an
update. 
Implementation
timescale: 
December 2024
Progress against the recommendation
The council updated its Flexible Working Policy in April 2024 to
reflect current legislation and modern working practices.
The updated policy formally links to Remote Working Guidance,
which sets out different work styles (such as home-based,
mobile, and hybrid arrangements), and to the new Right to
Disconnect Guidance introduced in July 2024. This guidance
explains how employees can switch off outside working hours
and includes practical advice on email etiquette, meeting
scheduling, and wellbeing.
To support managers in applying the policy consistently, the
council issued Manager’s Guidance on Processing Flexible
Working Requests in July 2024. This provides step-by-step
instructions, timelines, and template letters for approvals and
appeals. 
Conclusions
Complete
The council has updated
its policy and supporting
guidance to reflect current
practice and legislative
requirements. 
Page 50

Page 51

Page 51

Page 52

Transformation – How councils are
redesigning and delivering more
efficient services to achieve planned
outcomes. 
Forvis Mazars is the brand name for the Forvis Mazars Global
network (Forvis Mazars Global Limited) and its two
independent members: Forvis Mazars, LLP in the United
States and Forvis Mazars Group SC, an internationally
integrated partnership operating in over 100 countries and
territories. Forvis Mazars Global Limited is a UK private
company limited by guarantee and does not provide any
services to clients. Forvis Mazars LLP is the UK firm of Forvis
Mazars Global. 
Visit forvismazars.com/global to learn more about the
global network. 
Page 52

Page 53

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Audit Committee - 18 February 2026
___________________________________________________________________
Subject: Strategic Risks 2022-2027
1. Purpose
1.1 To provide an update on the strategic risks for 2022-27.
2. Recommendations
2.1 It is recommended that the Committee:
 Note the strategic risks as detailed at Appendix 1, and
 Endorse the removal of risk SR005.
3. Background
3.1 The Council’s 2022 – 2027 strategic risks were agreed by the Corporate
Services and Audit Committees in November 2022. The appended risks have
been reviewed with re-assessment undertaken before being reported to this
committee. This report is submitted as agreed to Audit Committee on a bi-
annual basis.
4. Main Issues
Strategic Risk
4.1 In line with the Council’s Risk Management Framework, a re-assessment of
the strategic risks has taken place as detailed within Appendix 1. Each risk is
managed through internal controls, linked actions and associated milestones
with the objective being to reduce or stabilise the level of risk through
completion of linked actions over a period and/or ensure mitigation factors are
adequate should the risks actually materialise.
4.2 Table 1 represents a risk dashboard that includes information on the original,
current and target rating for each strategic risk, as well as an assessment of
the current risk status. Each strategic risk is identified and supported by more
detailed information available on a “drill-down” basis in Appendix 1.
Six strategic risks associated actions and milestones are met and are
progressing as expected whilst getting closer to reaching their assigned
targets. SR001, SR007, SR008, and SR011 are currently off target, which is
explained in further detail below.
ITEM 7
Page 53

Page 54

4.3 Following feedback from the Audit Committee meeting in September 2025, a
strategic review has been undertaken of SR005 ‘Engaging Positively with
Residents, Communities and Partnerships’. The review concluded that this
area no longer meets the criteria for a strategic risk and compared to other
strategic risks the milestones are less definitive and more challenging to
measure. This may lead to reporting being more subjective and unreliable. It
is recommended that SR005 be removed from the Strategic Risk Register.
The Chief Officer for Regulatory and Regeneration will assess whether the
residual elements of this risk should alternatively be monitored and managed
at a service level.
Page 54

Page 55

Table 1 Key Strategic Risk Information
Strategic Risk Original
Risk
October
2022
Current
Risk
February
2026
Target
Risk
March
2027
Risk Status
Rationale
SR 001  Significant
financial funding
reductions/limitations
from Scottish Government
SR 002  Challenges in
implementing broad-
ranging school
improvement to raise
attainment and
achievement
SR 003  Maintaining
Council Assets that are fit
for purpose
SR 004  Keeping abreast
of developments in the
innovative use of
Information Technologies
SR 005  Engaging
positively with Residents,
Communities &
Partnerships
SR 006  Challenges in
protecting the Health and
Safety of Employees and
Others
SR 007  Complexities in
ensuring an appropriately
resourced and resilient
workforce
Page 55

Page 56

Risk Methodology and Reporting
4.4 Each strategic risk is populated in Pentana in terms of the following template:
 Risk title and code;
 Description;
 Ownership;
 Potential effect;
 Measures of impact;
 Risk factors;
 Internal controls;
 Risk opportunity; and
 Linked actions.
4.5 Each risk has been scored using a “4 x 4” matrix for likelihood and impact in
relation to:
 Current risk (with review dates set at pre-determined intervals); and
 Target risk (i.e. 31 March 2027 - the duration of the Strategic Plan).
The risk descriptors used in the “4 x 4” matrix are as follows:
SR 008 Threat of Cyber
Attack
SR 009  Challenges in
delivering effective
services in relation to
Roads & Neighbourhoods
SR 010  Failure to
maintain Housing Stock
SR 011  Inability to
reduce carbon footprint in
line with targets
Page 56

Page 57

Likelihood 
Score Descriptor
1 Unlikely
2 Likely
3 Very likely
4 Certain
Impact
Score Descriptor
1 Minor
2 Moderate
3 Significant
4 Critical
4.6 For ownership, each strategic risk is “Managed By” a Chief Officer and
“Assigned To” a Senior Officer. Strategic risks are also reported on a bi-
annual basis to the Performance & Monitoring Review Group.
Service Risk
4.7 Following the methodology in 4.3 to 4.4 above, each service has owned
operational risk registers in Pentana (the Council’s performance system)
which were reviewed as part of the 2025/26 service planning process.
4.8 Significant financial funding reductions/limitations from Scottish Government
It is expected the Council will continue to be faced with significant real term
funding reductions from the national settlement. This is based on the
Spending Review published by the Scottish Government in January 2026
which sets out multi-year spending plans over the three-year period 2026/27-
2028/29 across the various portfolios.  It illustrates that Local Government
funding, in cash terms, is expected to decrease by 0.07% over the three-year
period which will require councils to absorb the financial pressures brought
about by all inflationary increases.
4.9 Threat of Cyber Attack
This risk will always be high as the threat and likelihood of a Cyber Attack
remains. The UK public sector is still experiencing elevated levels of targeted
Cyber-attacks including recent attacks on Scottish councils. As this risk
continues to be high the emphasis remains on proactive measures to protect
the confidentiality, integrity and availability of our data, critical infrastructure,
and overall business operations.  
Key risks and continual threats include:
Page 57

Page 58

 Geopolitical threat increasing due to current world tensions. Russia is
recognised by national security operations as the world’s largest cyber threat
actor.
 Demand for emerging technologies such as Artificial Intelligence solutions
present new challenges for the council to implement and secure.
 Risk to Backup technology and corruption of council data.
 Ransomware attacks – surge in recent years, potential for significant financial
loss and operational disruption.
 Advanced Persistent Threats (APT’s) – sophisticated stealthy attacks
conducted by well-resourced groups, targets include critical infrastructure,
government bodies and large corporations.
 User awareness – Phishing attempts on the rise with more sophisticated
techniques being deployed including voice and text phishing. Targeted threats
tailored to specific areas of the Council are being observed. Social
Engineering and ‘old school’ cyber-attacks now present a higher risk.
 Third Party Risks – The Council often relies on third party vendors and
suppliers, increasing the risk of cyber-attacks through the supply chain.
Mitigations:
 Implementation of a new Cyber Incident Logging and Response system
(MDR) offering enhanced protection.
 Continual improvement of our vulnerability/patch management systems and
processes.
 Continual promotion of Cyber awareness through simulated phishing
campaigns supported by our online security training and awareness platform.
 Social Engineering guidance issued to all employees with new ‘Be Cyber
Smart’ campaign.
 Engagement with ICT Security Partners to highlight and advise on specific
areas of risk.
 Continual assessment and improvement of our Cyber Security posture.
 Robust Business Continuity and Disaster Recovery plans with a new ICT
backup policy in place.
Progress continues to take place to improve our security posture in line with
the national Public Sector Action plan (PSAP) and Public Sector Network
(PSN) compliance. Vigilance of the National Cyber Security Centre (NCSC)
Cyber Security and Scottish Government (SC3) guidance continues to remain
in place.
4.10   Complexities in ensuring an appropriately resourced and resilient workforce
The risk rating remains scored at a 6. The difficult funding position means an
impact on an appropriately resourced and resilient workforce is expected, this
is now starting to become clear in the employee engagement measures in
place with fewer employees feeling valued than last year as reported at JCF
in September 2025. It is unlikely that this change will be reversed whilst
services continue to review structures and service delivery models in
response to the Council's financial challenges. 
Page 58

Page 59

The Workforce Planning Strategy is in place for 2022-2027. Additionally, the
People First Strategy covers the same period and consolidates several areas:
well-being, employee engagement, workforce planning, learning and
development and digital. A robust package of wellbeing resources continues
to be available, the council is recognised as a leading employer in terms of
adapting flexible working practices, attendance levels are closely monitored,
with personal stress and minor ailment absences currently prevalent.
Digital improvements continue to be prioritised with the ongoing roll out of M
365 Share point and the Fit for Future programme now focussing on corporate
processes with a view to identifying and reducing waste and duplication.
Reductions across the people support functions mean that there are ongoing
challenges in supporting services and this is being mitigated where possible
by using digital tools to free capacity and focussing on essential service
delivery activity, but it should be noted that service levels have been impacted
with certain activities ceasing such as regular HR attendance at management
meetings.
4.11 Inability to reduce carbon footprint in line with targets
The Council's emissions for 2024/25 were reported in November 2025
showing significant progress; 28.3% reduction on the previous year, 44.7%
reduction on 2012/13 baseline and 17.9% ahead of projected target. These
are positive steps however the main reduction is from the Council's scope 3
waste emissions, which is a result of shifting a significant amount of waste
from landfill to incineration through the Net Zero Cooperation Agreement with
Glasgow City Council.
Both scope 1 and 2 emissions increased slightly for 2024/25 period. To reach
a 61% reduction by 30/31 we need to reduce a further 16.3% in just over five
years and investment in required to reduce gas, electricity and diesel
consumption.
The long-term Climate Change Coordinator vacancy has been filled internally;
this currently leaves another vacancy within the energy team that will be filled
as soon as possible. Participation from service areas has increased at
Climate Change Action Plan meetings and emission reductions actions and
projects are forthcoming. The Council also has the opportunity to utilise
ClimateView and track trajectory to Net Zero, allowing actions and projects to
be prioritised and a more collective, strategic approach to be implemented.
The Council may be able to reduce the risk assessment of non-delivery of
carbon emissions targets, but further consideration is needed
Page 59

Page 60

5. People Implications
5.1 There are no people implications associated with this report, other than in
relation to the mitigation of risk.
6. Financial and Procurement Implications
6.1 There are no financial and/or procurement implications directly associated
with this report however there are in relation to any expenditure linked to
mitigation.
7. Risk Analysis
7.1 Failure to ensure robust risk management is likely to result in the Council
being criticised by External Auditors for not having an integrated approach to
embedding risk management within the authority with the result that a “no
scrutiny required” status would not be achieved.
7.2 Progressing with a robust risk management approach will demonstrate that
the Council is taking ownership of risk management and ensuring effective
measures are in place. The ability to demonstrate risk ownership should
benefit the Council in terms of:
 Understanding risk and its potential impact on the Council’s priorities and
objectives;
 Reducing insurance premiums going forward by recognising that a mature
approach to risk management will contribute to a reduction in the number
and value of claims across a range of insurance classifications;
 Contributing towards incident prevention based upon post-incident
investigation;
 Meeting statutory/regulatory requirements; and
Ensuring better partnership working with external and internal partners.
8. Equalities Impact Assessment (EIA)
8.1 EIA 548 notes the positive impacts of an approach to risk that integrates
considerations on equalities, human rights health and social and economic
impacts that is aligned with the content of the new Strategic Plan.
9. Consultation
9.1 The strategic risks have been discussed with the Chief Officers and senior
management. The reports to committee are available to the Trades Union and
consultation undertaken as required.
9.2 The strategic risks have been cross checked with WD HSCP. This ensures
that issues affecting HSCP are reflected within the wider council strategic risk
report.
Page 60

Page 61

10. Strategic Assessment
10.1 At its meeting on 26 October 2022, the Council agreed that its four main
strategic priorities for 2022 - 2027 are as follows:
 Our Communities - Resilient and Thriving
 Our Environment - A Greener Future
 Our Economy - Strong and Flourishing
 Our Council - Inclusive & Adaptable
10.2 The strategic risks have been identified to complement and underpin all
strategic priorities.
Name:   Victoria Rogers
Designation:   Chief Officer People & Technology
Date:   30th January 2026
Person to Contact: Harry McGhie, Risk & Health and Safety Officer
Harry.McGhie@west-dunbarton.gov.uk
Appendices: Appendix 1: Detailed Strategic Risk List
Background Papers: West Dunbartonshire Council Strategic Plan 2022-2027
Risk Management Framework
EIA screening
Page 61

Page 62

Page 62

Page 63

1
Strategic Risk Report
Generated on: 30 January 2026
SR 01 Significant financial
funding reductions /
limitations from Scottish
Government
It is expected the Council will continue to be faced with significant real term
funding reductions from the national settlement. This is based on local
government settlements in recent years (with the exception of 2025/2026).
This coincides with a period where costs and demographic pressures are
continuing to rise in relation to social care, significant inflationary increases
and pay award pressures linked to inflation. Whilst there are ongoing
discussions between the Scottish Government and Local Government on
reducing the ring fencing of funding the reality is that material elements of
funding remain ring fenced which significantly restricts how the Council can
most effectively use the funds made available to it.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
29-Jan-
2026 16 31-Mar-2027 4 Laurence Slavin
Potential Effect
Shortfall in finances resulting in the Council being unable to provide all services as intended and needing to
identify further cuts to services to deliver a balanced budget. This extends to those services delegated by
the Council to the Health and Social Care (HSCP) Board.
Measures of
Impact
- Real terms reduction in Scottish Government settlement
- Demographic change (population decline/growth, aging population)
- Cost reduction required including reducing level and/or quality of service provision
- Increased Debt (collection of Council Tax, HRA rents, etc)
-Depletion of reserves
Risk Factors
- Insufficient funding to retain essential services and fully fund policy commitments.
- Lack of time to plan for changes in the level of grant funding due to single year settlements
- General inflationary factors
- Instability of Bank of England Base Rate
- Significant additional cost pressures, driven by demographic profile.
- Insufficient capital receipts to cover loan repayments (creating a revenue pressure)
Internal Controls
- Long Term Financial Strategy
- Regular Financial Updates to Council
- Monitor and maintain General Services and Housing Revenue Account prudential targets
- Reporting and monitoring of Treasury Management Strategy
- Budgetary control process
- Regular budgetary control and savings monitoring reports provided to CMT and Council / committees
- Active engagement with HSCP Chief Officer on financial performance and budget planning
- Rigorous debt collection processes
- Annual Internal Audit Plan
- Work of External Auditors (external control)
- Annual Governance Statement
Latest Note
It is expected the Council will continue to be faced with significant real term funding reductions from the
national settlement. This is based on the Spending Review published by the Scottish Government in
January 2026 which sets out multi-year spending plans over the three-year period 2026/27-2028/29 across
the various portfolios.  It illustrates that Local Government funding, in cash terms, is expected to decrease
by 0.07% over the three-year period which will require councils to absorb the financial pressures brought
about by all inflationary increases.
Risk Opportunity
-Significant council projects focusing on long term economic development in the West Dunbartonshire area
to grow the local economy and generate revenue
- Annual exercise to identify efficiencies
- Projects to implement new ways of working (e.g. digitisation, automation, asset management)
Linked Actions Code & Title Progress Status Assigned To
RES/25-26/004 Review ways of decreasing corporate debt through
continued improvements to debt collection processes in relation to
sundry, NDR, Council Tax and rent
Ryan Chalmers
ITEM 7 
APPENDIX 1
Page 63

Page 64

2
RES/25-26/005 Review ways to improve rent collection rates in
conjunction with Housing and W4U Ryan Chalmers
SR 02 Challenges in
implementing broad-ranging
school improvement to raise
attainment and achievement
This risk concerns delivering excellence and equity for children and young
people. National and local indicators have been set to monitor progress with
outcomes relating to attainment and achievement with a key focus on making
progress to narrow the poverty related attainment gap.
Scottish Equity funding devolved to local authorities aims to deliver on
priorities between 2023-26. This funding will end in 2026.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
20-Jan-
2026 4 31-Mar-2027 2 Julie McGrogan
Potential Effect
Improved outcomes for young people would not be attained and achieved.
The Council would fail to meet the needs of individual learners particularly those children and young people
most disadvantaged by poverty.
Risk of reputational damage to the service and the wider Council if outcomes and targets not as education
as a statutory service is subject to close scrutiny of local authority performance with outcomes for children
and young people by the local community and by the national agencies.   
Measures of
Impact
Stretch Aims and Targets for attainment and achievement 3-18 et to be achieved by 2026. The Stretch
Aims  are scrutinised annually by Scottish Government and Education Scotland.
West Dunbartonshire Performance Targets for attainment and narrowing the poverty related attainment
gap in Early Years, Broad General Education and Senior Phase
West Dunbartonshire Improvement Board Quality Indicator Evaluations
National Qualifications Attainment and Achievement Results
Broad General Education Achievement of  Level Results
West Dunbartonshire Scottish National Standardised Assessment Data
Positive Destination Data
West Partnership Attainment , Equity and Destination Performance Measures
Her Majesty’s Inspectors of Education inspection reports
Stakeholder Feedback
Risk Factors
Reduced funding 2022 -2026; no confirmation of future funding from 2026:
This Strategic Priority  has been supported by Scottish Government Attainment Challenge Funding since
2015 and since 2022 Strategic Equity Funding. Also, schools in West Dunbartonshire have received Pupil
Equity Funding since 2016. The national funding streams are committed to until 2026 – there is uncertainty
as to future funding provision. From 2022 – 2026 the Strategic Equity Fund is being tapered with annual
reductions in the funding the local authority receives.
This will reduce resources available to deliver work streams related to SEF.
Internal Controls
-Strategy for Excellence and Equity 2023 – 2026 ( developed to embed improvements achieved and
support  an exit strategy from Strategic Equity Funding by 2026).
-Project management by Senior Education Officer
-Education Improvement Board chaired by Chief Education Officer
-Scrutiny by Scottish Government and Education Scotland (progress reports produced and submitted)
-WDC Improvement Framework
-Termly progress reports submitted as part of Educational Service committee reports
-Relevant Continuous Professional Development programme to support education staff
-Meetings between WDC and Education Scotland/Her Majesty's Inspectors of Education
-BGE Attainment and Performance Data
-Literacy, Numeracy and HWB Steering Group
-National Improvement Framework (NIF)
-Education Recovery Plan
Latest Note
Action plan implemented academic session 2024/25 resulting in continued strong performance; with some
evidence of attainment levels plateauing.  Action plan for academic session 2025/26 produced and included
in National Improvement Framework report submitted to Education Committee and Scottish Government in
September.
Risk Opportunity
Improved attainment - improved attendance - reduced exclusions - reduced violent incidents - reduction
requirement for targeted support over time - reduction requirement for specialist placements over time -
improved learning & community engagement - children/pupils at risk identified earlier and more effectively
- more empowered community providing self-sustaining peer support - increase in the percentage and
range of positive destinations over time - increased access to digital learning resources
Page 64

Page 65

3
Linked Actions Code & Title Progress Status Assigned To
ED/25-26/003 Close the attainment gap between the most and least
disadvantaged children and young people Julie McGrogan
ED/25-26/005 Improve skills and sustained, positive school leaver
destinations for all young people Andrew Brown
ED/25-26/004 Improve attainment, particularly in literacy and numeracy Julie McGrogan
SR 03 Maintaining Council
Assets that are fit for purpose
The risk that the Council's assets and facilities are not fully fit for purpose
with consequent adverse impact on our ability to deliver efficient and effective
services. Assets included in this assessment are; the Council’s property
portfolio.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
07-Jan-
2026 2 31-Mar-2027 2 Michelle Lynn
Potential Effect
- Assets are not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
- Service users require to seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions
-Council assets fail to meet relevant standards which are reported to either Scottish Government and/or
Care Inspectorate.
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of asset base and facilities -Asset user satisfaction -
Operating costs and savings
Risk Factors
- Adequacy of funding available to improve asset base
- Adequacy of staff resources allocated to the area of asset management
- Council buildings/assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts from surplus property sales
- Increase public liability claims
Internal Controls
- Corporate Asset Framework
- Learning Estate Strategy 2020-2030
- Property Asset Plan 2023-2028
- Property and Land Disposal Strategy
- Capital project meetings are carried out regularly  in addition to project specific meetings and Building
Services/Asset Management monthly meetings
- Capital Programme
- Strategic Asset Management Group
- Learning Estate Project Board
- Detailed asset database that shows relevant information on a
property by property basis in relation to operational, non-operational
- Sustainability Policy
Latest Note
The risk score remains low due to the ongoing programme of capital works.   The Property Action Plan
2023-28, approved at Infrastructure, Regeneration and Economic Development Committee in February
2023, will monitor all requirements to maintain the risk score.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council assets.
-Estate, assets and service delivery (e.g. new school buildings, operational building upgrades, office and
depot rationalisation projects)
- Enhance employee "feel good" factor by providing modern office accommodation equipped with up to date
IT facilities
-Improved satisfaction from public building users
- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- Prioritised Building Upgrade Plan
Linked Actions Code & Title Progress Status Assigned To
RES/25-26/007 Progress the disposal of key strategic sites Michelle Lynn
Page 65

Page 66

RES/25-26/012 Develop and implement plans and support services to
achieve the asset related savings agreed by Council Michelle Lynn
SR 004 Keeping abreast of
developments in the innovative
use of Information
Technologies
Failure to keep pace with changing technology environment
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
06-Jan-
2026 2 31-Mar-2027 2
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
Potential Effect
A lack of consistent, sufficiently robust service planning in respect of ICT arrangements is likely to result in
the Council being ill prepared to meet future demands in key service areas and lacking the capacity to
respond effectively to changing need such as increased requirement for remote working as identified during
covid pandemic.
Measures of
Impact
• Close relationship and working practices with council Asset Management Service regarding property
rationalisation.
• Implementation of mobile and flexible working, enabling a downsizing of required office accommodation
as people to work more efficiently and to adopt a more flexible policy towards office accommodation and
desk provision.  
• Number of systems that have supplier maintenance contracts. – annual process.
• Invocation of Service Business Continuity Plans and ICT Disaster Recovery plan
• Degree of compliance with security controls to prevent data loss through poor o/s patching, cyber-attack,
firewall configurations, switch replacements/upgrades etc
• Fit for purpose primary and secondary data centres
• Modern Wi-Fi technology in all council locations.
• Broadband speed in the Council area - WDC has 2nd highest broadband speeds in Scotland. 
Investigating funding options for fibre network.
• Number of ICT Service Desk incidents resolved within half day - exceeded the target and higher target
set.
• Extent of functionality development in key Council systems (i.e., lack of development beyond base
system leading to ineffective management information) – several channel shift projects delivered, and
more are in progress. PSN/Risk/challenging. Support service areas.
• Fit for purpose Council website, delivering information and services to a significant percentage of the
Council's customers.
• Provide efficient desktop services supporting laptops, Chromebooks, PCs, Thin client terminals to meet
changing workforce flexibility and property rationalisation requirements.  5-year Device replacement
programme in place.
Risk Factors
• Insufficient resourcing of ICT developments so that benefits and opportunities identified are not realised
• Lack of network security controls implemented. I. e Lack of intrusion detections alerts
• failure to respond to audit / PSN test findings and recommendations,
• insufficient resources allocated to security tasks.  However, Service redesign and ICT resources aligned to
security tasks and improved monitoring processes and tools as well as additional tools purchased to help
support remote working environment all help to mitigate this risk.
• Insufficient Service Business Continuity Plans and/or Disaster Recovery Capability.
• Lack of project and programme change management arrangements.
• Poor quality of mobile communication provision.
• Lack of uptake on channel shift.
Internal Controls
- Ongoing Capital programme established for technology refresh projects
- Information & Communication Technology (ICT) Policies such as ICT Security Framework
- Governance structures such as ICT Steering Board, Education ICT Steering Board, Digital Transformation
Board in place to support governance, integrated planning and decision making in relation to ICT
-Use of both internal IT resources from across the Council and skilled specialist consultants in key areas
- Fit for purpose primary and secondary data centres
Latest Note
January 2026
The Council continues to embrace innovation with the implementation of several improvement projects.
The Councils legacy telephony system is currently being replaced during 2026 with a new cloud platform
Page 66

Page 67

solution that will also provide a new modern Council Contact Centre solution to enable Customer Services
to enhance citizen communication.
There continues to be investment in cloud services with MS SharePoint and One Drive with corporate
service areas currently migrating to the platform. It is anticipated all services and partners will be migrated
by July 2026 and the project completed. Education services migration in March 26 will include access to
One Drive for high school pupils.
Artificial Intelligence solution MS Co-Pilot Chat has been deployed council wide, and this new solution
enables employees to save time on day-to-day tasks. ICT are currently planning a pilot of the advanced
version of Copilot 365 which will enable integration across council data and systems. People & Technology
teams are also researching the use of AI Agents to assist service areas to automate workflows and
processes.
The SWAN (Scottish Wide Area) project to improve bandwidth capacity at all Council sites has now been
completed with 76 sites now migrated to the new network. In addition, ICT also upgraded the Councils
internet line and Aurora Data Centre to 10GB to delivering digital ready bandwidth across the
infrastructure.
ICT are also recently launched a new live chat facility that allows employees to raise ICT incidents &
requests via live chat to human service desk analysts. This solution has been very well received by Council
employees.
ICT are also supporting service areas with new technology pilots i.e. AI note taking in HSCP and
implementation of a new finance and planning systems.
Risk Opportunity
-365. Provide Council employees with secure access to email and supporting systems from anywhere.
-Opportunity to redesign infrastructure and introduce new tools and security measures to support hybrid
working environments. –
- Annual network penetration tests and for PSN compliance audit
- Annual External Audit on ICT Controls
- Continued investment in ICT infrastructure and its focus on network security and resilience.
- Provide appropriate technology for employees, pupils, and service users as well as for ICT support teams
- Rationalise IT systems
- Increased use of mobile devices e.g., laptop/tablet devices and Chromebooks
- Review of device strategy and efficient/effective approach.
- Provide self-service style systems to employees and citizens
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/ICT/03 Develop and Implement next stage of Microsoft 365
roadmap
James Gallacher;
Patricia Kerr
P&T/25-26/ICT/04 Complete review of ICT devices due to be replaced
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
P&T/25-26/ICT/05 Review and explore next generation technologies
Andrew Cameron;
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
SR 05 Engaging positively with
Residents, Communities &
Partnerships
The risk that the Council fails to adequately engage, establish and maintain
positive relationships with local residents and communities in addition to
partnership bodies.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
09-Jan-
2026 4 31-Mar-2027 2 Colin Smith
Potential Effect
Potential for tensions to develop with residents and local community groups
Reputational damage to council services
Degradation of trust in service provision A failure of strong partnerships could impact on the Councils
obligations under Community Empowerment Act
Measures of
Impact
Successful delivery of Local Outcome Improvement Plan (LOIP) and supporting plans positive partnership
inspections
Page 67

Page 68

Informed and engaged residents participating in consultation activity
Telephone survey monthly, quarterly and annual measures Increased social media engagement and reach
Risk Factors
Inability to deliver improved outcomes which require strong partnership activity
Council's reputation is adversely affected through a failed partnership arrangement
Lack of appropriate staff development / skills may be lacking to support new model of service delivery
Team restructure, post reductions and team overall budget savings challenges the viability of the team to
deliver against strategic plan and community needs.
Inequity of engagement across the partnership on key local issues
Council seen as unresponsive to community if feedback from engagement not acted upon
Apathy within communities leads to little or no engagement Some community groups feel their voices are
not being heard
Internal Controls
Robust partnership arrangements through community planning partnership
Align the Council's strategic plan with the Local Outcome Improvement Plan (LOIP)
Ensure that partners have signed up to deliver on the outcomes and targets set in the LOIP
Develop data sharing protocols with partner agencies
Participate in reform agenda as it impacts on Council area
Ensure robust mechanisms for public feedback (Embedding the Strategic Engagement Framework)
Annual budget consultation events
Citizens Panel
Open Forum questions at Council meetings
Latest Note
A partnership approach to Community engagement is being undertaken led by the Community Planning
Partnership and associated partnerships- Community Learning and Development and Community
Development Alliance in particular.  The Communities Team and other partners deliver community
development work which seeks to raise awareness of community planning and Community Empowerment
in communities.  Locality plans, community-led place planning and work to support the Clydebank
Neighbourhood Board’s community engagement means this risk is unchanged.
Risk Opportunity
Position West Dunbartonshire as a modernising Council
Residents are more comfortable with the digital platform as a result of the enforced cessation of face to
face services - this presents an opportunity to modernise communication
Community Empowerment Act
Participation requests Asset transfer
Linked Actions Code & Title Progress Status Assigned To
CCF/25-26/C&D/05 Support upgrade to Contact Centre Telephony
Platform Lorraine Phimister
CCF/25-26/COM/01 Develop a communication plan to support budget
savings initiatives for 25/26 Lauren Crooks
CCF/25-26/LIB/03 Create a strategy document for West Dunbartonshire
Libraries Emma Eremin
CCF/25-26/LIB/04 Develop and deliver the Libraries Empower
Connections Digital Offering Emma Eremin
CCF/25-26/C&D/03 Review website accessibility to ensure it complies
with regulations Jonathan Muir
CCF/25-26/P&S/03 Carry out strategic engagement to support budget
consultation 2026/27 Nicola Docherty
SR 06 Challenges in protecting
the Health and Safety of
Employees and Others
Failure to meet the Council’s duty to protect the health, safety and welfare of
its employees and other people who might be affected by its business
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
14-Jan-
2026 4 31-Mar-2027 4 Louise Hastings
Potential Effect
Poor health and safety culture within the organisation leading to;
Risk of an employee, service user, pupil (young person) or member of the public being seriously / fatally
injured by fault of the Council; reputational risk regarding negative publicity; financial risk in terms of
claims management compensation to the injured party; increase in insurance premiums; risk of
prosecution by the HSE resulting in a fine and/or a Council Employee being subject to criminal charges,
Page 68

Page 69

poor employee morale, high staff turnover leading to diminished service delivery.
Measures of
Impact
Resources associated with in-house/HSE investigation. Incident statistics. Service delivery impact in terms
of injury-related absence and potentially enforced cessation of work activities. Impact of injury on
employees/members of the public, legal proceedings, financial penalties, potential reputational damage and
risk of criminal charges. Hazard reporting. Actions at health and safety committees. Implementation of
Corporate health and safety plan.
Risk Factors
Lack of resources, inadequate Safety Management Standards and H&S strategy. Poor health and safety
culture. Under reporting of incidents. Blame culture. Poor communication between management and
employees. Competent advice.
Internal Controls
•Competent health and safety advice readily available from the Corporate H&S team.
•Corporate health and safety plan developed and monitored via Pentana.
•Robust health and safety management system, FIGTREE.
• Council has in place a robust H&S policy, Safety Management Standards and Fire Risk Management
Strategy that includes service specific health and safety plans, duties and responsibilities for Chief Officers,
managers and employees.
• Adequate H&S resources in place to that will allow statutory obligations in terms of the Health and Safety
at Work etc. Act and supporting legislation.
• Embedded H&S culture that discusses H&S issues at senior level and cascades throughout the
organisation through the health and safety committee system.
• Monthly reports to PMRG on organisational safety performance and issues.
•Chief Officers attend service H&S committees on a quarterly basis.
• Workplace inspection and audit programme.
• Service risk profiling.
• H&S training needs analysis for every employee group.
• The Council has in place a Trade Union Health and Safety Partnership Agreement.
• Council promotes health and safety training for TUs to diploma level.
• Hazard reporting module via FIGTREE.
• Health & safety e-learning package.
• Risk assessment working groups for service areas and review process.
Latest Note
Corporate H&S are actively reviewing and optimising key service areas, including Safety Management
Standards and training.
Work is also being carried out to refine and simplify the health surveillance process in collaboration with OH
and line managers.
The ongoing management of H & S within the Council includes overseeing the management workplace
inspection programe. Alongside this the Corporate H&S team are conducting inspections, noise monitoring,
completing audits benchmarking against the councils safety management standards, scaffold inspections
and facilitating training. Additionally, the Corporate H&S team manage and facilitate the monitoring of risk
assessments council wide to ensure all risk assessments are up to date and relevant.
Fire safety management remains a priority for the Corporate H&S team. The team are conducting fire risk
assessments in line with the teams annual H&S plan. The team are also providing fire safety training to
staff within HSCP and on an ad-hoc basis to other services across the council.
The Corporate H&S team also regularly provide updates to PMRG on the status of overdue actions. In doing
this there has been a marked reduction in the overall number of overdue actions. This forum allows
Corporate H&S to have closer ties with management across the council which in turn facilitates a more
proactive approach for the management of H&S. 
No change to risk matrix.
Risk Opportunity
Demonstrate to committees, elected members, Trade Unions, employees, the community and other
external partner’s evidence of robust H&S culture. Good knowledge and awareness of health and safety
throughout all services. Positive relationship with Corporate health & safety team and all services. Reduced
incidents, costs and absence rates.
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/P&C/03 Continue to embed key Health and Safety practices. Louise Hastings; Harry
McGhie
SR 07 Complexities in ensuring
an appropriately resourced and
resilient workforce
Failure to ensure that there is an appropriately resourced and resilient
workforce in place to meet future organisational needs, in effectively
executing the Council’s 2022-27 Strategic Plan.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
Page 69

Page 70

14-Jan-
2026 6 31-Mar-2027 2 Louise Hastings
Potential Effect
Inability to deliver services effectively
Reduced level of service
HSCP - workforce capacity, recruitment and retention challenges; appropriate training for roles
Lack of improvement or increase in staff absences
Council underachieves as an organisation
Low staff morale
Employee conflict
Increased turnover Inability to attract/recruit
Measures of
Impact
- Access to and participation of employees in learning and
development activities
- Absence rate and trends
- Employee turnover
- Grievance, discipline and other monitoring information
- Employee  voice and associated actions
- Reports from external scrutiny bodies and award bodies - Benchmarking with appropriate comparators
Risk Factors
- Inability to attract/recruit
- Lack of appropriate development
- inadequate skills
-risk to new models of service delivery
- Lack of resource/capability to deliver - Workforce unable to adapt to change
Internal Controls
- HR processes designed to meet service delivery needs
- Develop new structures to reflect strategic priorities and aligned to Standard Operation Model (SOM)
- Align workforce plan to the Council's strategic planning processes (i.e. have the right people available at
the right time with the right skills to fulfil properly all of the Council's strategic priorities)
- Periodic review of pay arrangements in accordance with EHRC guidance (currently every 3 years)
- Incorporation of succession planning into workforce planning framework
- Identify training programmes to upskill staff
- Effective use of SWITCH to support alternative careers
- Flexible HR policies, in particular People First covering workforce planning, learning & development
(including elearning), digital/continuous improvement, employee wellbeing & engagement.
- Effective use of Occupational Health Service
- Robust Be the Best Conversations process
- Effective leadership and management behaviours, practice and programmes 
Latest Note
Workforce Planning Strategy in place for 2022-2027.
People First Strategy is in place covering 2022-2027 and this is a consolidation of a number of areas: well-
being, employee engagement, workforce planning, learning and development and digital.
WDC are recognised as leading in terms of adapting flexible working practices.
A robust package of wellbeing resources continue to be available, absence levels are closely monitored,
with personal stress and minor, ailments absences prevalent.
A range of communication tools and channels are regularly utilised to ensure that employee voice is heard
and key information is shared with the workforce.  Engagement measures are now showing a downward
trend in relation  to the workforce feeling valued, this is in the context of the ongoing financial challenges
and resulting restructure exercises to deliver savings options. 
Maximising digital tools and solutions to aid the workforce continues with the ongoing rollout of M365
Sharepoint and the Fit for Future programme focussing on corporate processes to identify efficiencies,
starting with the Supporting Employee Wellbeing process.  Additionally, the Digital team continue to
highlight digital learning resources and tools available to aide adoption levels.   
There have been reductions across the people support functions and this has increased the challenges in
supporting services.
Risk Opportunity - Identify previously unknown skills and talents in the workforce - Realise the potential of staff
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/P&C/04 Improve employee life cycle and optimise employee
development opportunities
Leeanne Galasso;
Louise Hastings
Page 70

Page 71

P&T/25-26/P&C/06 Undertake a strategic review of job profiles across the
Council
John Duffy; Louise
Hastings; Lisa
MacGregor
SR 08 Threat of Cyber-attack
Data, systems and/or infrastructure are impacted as result of security attacks
which are increasing in number at a time when this threat is already placing
demands on resources to deliver increased levels of security controls.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
08-Jan-
2026 9 31-Mar-2027 4
Andrew Cameron;
James Gallacher;
Patricia Kerr
Potential Effect
• Remote working could be impacted for Council employees and partners HSCP, VJB and WDL by loss of
internet services.
• Disruption to services impacting service delivery to citizens
• Employee and Citizen data loss with the potential for misuse such as identity fraud
• Misinformation being delivered to the public via WDC communication channels
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage
• Redirection of resources to deal with the impact of an attack and away from BAU work 
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage
• Inability to provide a secure information management network for Council and partners including HSCP,
VJB and WDL.
Measures of
Impact
• Obligation to secure Cabinet Office PSN compliance certification.
• Obligation to comply with DWP MOU
• Monitor remote access usage to capacity plan
• Recorded attempts from unauthorised sources to breach council cyber defences
• Recorded cyber related incidents in the Cyber incident log
• Quantity of breaches/incidents reported to the Information Commissioners Office
• Fines levied for breaches 
Risk Factors
• Potential for attacks out of normal working hours /days
• Inappropriate Cyber defences at the perimeter of the council network and NHS interconnect network
• Inappropriate delivery of security patches to desktop, network switches and server estates
• Compliance with security standards such as PSN, PCI, Public Sector Action Plan on Cyber resilience for
Scotland • Continually changing threat landscape
• Maintaining relevant skill sets among employee group / cost of securing expert resources
• Increased targeted attacks and risks due to Remote working.
•Remote access technology may not remain fit for purpose in a Smart working environment
Internal Controls
Robust backup strategy in place on premise and cloud backup for 365 with immutable capability.
• Service Continuity Plans
• ICT Disaster Recovery Plan
• Continually review and update internal policies on patching and system hardening to ensure we keep
abreast of emerging threats and trends
• Annual PSN compliance audit including a comprehensive IT Health Check
• Governance structure in place, ICT Steering Board consisting of senior management and relevant
stakeholders meeting bi-monthly or as required in response to incidents/events
• Programme of Internal and External ICT audits
• Information Security/Data Protection forum.  Project specific forums 
• Multiple layers of Cyber defences
• Network Segregation
• Rolling programme of security awareness sessions
• Interagency and cross Council working groups and sharing.
• National Digital Office / Scottish Government Public Sector Security programme and guidance
• Continually review technologies in line with new working practices to ensure security and assurance is
integral.
• Monthly device and server patching regime.
Latest Note
January 26
This risk will always be high as the threat and likelihood of a Cyber Attack remains. The UK public sector is
Page 71

Page 72

still experiencing elevated levels of targeted Cyber-attacks including recent attacks on Scottish councils. As
this risk continues to be high the emphasis remains on proactive measures to protect the confidentiality,
integrity and availability of our data, critical infrastructure, and overall business operations.   Key risks and
continual threats include:
• Geopolitical threat increasing due to current world tensions. Russia is recognised by national security
operations as the world’s largest cyber threat actor.
• Demand for emerging technologies such as Artificial Intelligence solutions present new challenges for the
council to implement and secure.
• Risk to Backup technology and corruption of council data.
• Ransomware attacks – surge in recent years, potential for significant financial loss and operational
disruption.
• Advanced Persistent Threats (APT’s) – sophisticated stealthy attacks conducted by well-resourced groups,
targets include critical infrastructure, government bodies and large corporations.
• User awareness – Phishing attempts on the rise with more sophisticated techniques being deployed
including voice and text phishing.  Targeted threats tailored to specific areas of the Council are being
observed. Social Engineering and ‘old school’ cyber-attacks now present a higher risk.
• Third Party Risks – The Council often relies on third party vendors and suppliers, increasing the risk of
cyber-attacks through the supply chain.
Mitigations:
• Implementation of a new Cyber Incident Logging and Response system (MDR) offering enhanced
protection.
• Continual improvement of our vulnerability/patch management systems and processes.
• Continual promotion of Cyber awareness through simulated phishing campaigns supported by our online
security training and awareness platform.
• Social Engineering guidance issued to all employees with new ‘Be Cyber Smart’ campaign.
• Engagement with ICT Security Partners to highlight and advise on specific areas of risk.
• Continual assessment and improvement of our Cyber Security posture.
• Robust Business Continuity and Disaster Recovery plans with a new ICT backup policy in place.
Progress continues to take place to improve our security posture in line with the national Public Sector
Action plan (PSAP) and Public Sector Network (PSN) compliance. Vigilance of the National Cyber Security
Centre (NCSC) Cyber Security and Scottish Government (SC3) guidance continues to remain in place.
Risk Opportunity
• Increase Cyber resilience and awareness for employees, members and citizens, this can be done through
existing training and awareness platform
• Contribute to Scottish Government Public Sector Action Plan on Cyber resilience for Scotland and
potential to become involved in a national/shared security operations centre
• Upskill employees to address current and emerging threats
• Increased employee awareness across Council and partners HSCP, VJB and WDL.
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/ICT/01 Further secure the next phase of the Council’s
technology infrastructure
Andrew Cameron;
James Gallacher;
Patricia Kerr
P&T/25-26/ICT/04 Complete review of ICT devices due to be replaced
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
P&T/25-26/ICT/05 Review and explore next generation technologies
Andrew Cameron;
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
SR 09 Challenges in delivering
effective services in relation to
Roads & Neighbourhoods
The risk that the Council’s fails to deliver on the three service areas within
Roads & Neighbourhood: Roads & Transportation, Waste & Greenspace and
Fleet & Working 4 You. These areas provide services across a range of areas
including managing and maintaining roads, footpaths and associated
infrastructure, managing flood risk, winter gritting, grounds maintenance,
street cleaning, burial and cremation, outdoor facilities, waste and recycling,
vehicle fleet management and providing working 4 you services such as
employability, child poverty plan, access to benefits etc. Failing to ensure
these services are not fully fit for purpose could result in adverse
Page 72

Page 73

consequences in relation to delivering efficient and effective services.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
05-Jan-
2026 4 31-Mar-2027 2 Gail Macfarlane
Potential Effect
- Service cannot be properly delivered to the satisfaction of service users
- Service users seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
- Failure of assets and non delivery of services ie crematorium, fleet vehicles, street lighting
-Council assets in poor conditions
-Council assets fail to meet relevant standards
- Council projects are not delivered on time or on budget
-Failure to comply with Transport (Scotland) Act 2019
-Failure to comply with Waste (Scotland) Regulations 2012
- Assets not fit for future and investment not sufficient to fulfil capital investment needs.
- Failure to comply with Good Operator License requirements.
- Increased reliance on hire vehicles should fleet investment not be adequate.
Measures of
Impact
- Condition surveys
- Defect inspection and management
- Suitability surveys
- Road Condition SPI
- Tree Condition surveys
-Customer perceptions of service delivery
- Investment levels in Assets ie Road Network, Street Lighting Columns, Fleet Vehicles, Crematorium
-Asset user satisfaction -Operating costs and savings
-Local Government Benchmarking Framework (LGBF)
-Association for Public Service Excellence (APSE)
-Waste Managers Network Group
- Child Poverty Annual Monitoring Report
Risk Factors
-Adequacy of funding available to improve assets ie parks, road network
- Adequacy of funding to maintain asset base ie roads at a steady state
- Adequacy of staff resources allocated to the area
-Over one third of the road network is in need of repair and the current long term capital funding only
sustains a steady state condition of the road network
- Increased public liability claims due to poor condition of roads network
- Increase public liability claims due to poor condition of footpaths and roads which are not part of our
adopted network.
- Risk of failure of street lighting columns due to significant number outwith 25 year life span
- Adequacy of funding available to manage ash dieback
-Poor customer engagement for recycling, deposit return scheme, refuse transfer station
-Financial challenges
- Budget Sensitivity Analysis (fuel costs, waste refuse disposal tonnage costs, bitumen availability and
costs)
Internal Controls
-Strategic Asset Management Group
- Corporate Asset Management Strategy
- Capital project meetings are carried out monthly in addition to project specific meetings. 
- Capital plan
- Roads and Lighting Asset Implementation Plan
- Fleet Asset Implementation
- Open Space Asset Implementation Plan
- Sustainability Policy
- Waste Strategy and Project Board
- Net Zero Cooperation Agreement Project Board
-User feedback – complaints data, Citizens’ Panel
-Climate Change Strategy
-Community Empowerment Strategy
-Food Growing Strategy and Allotments
-Equality Outcomes
Page 73

Page 74

Latest Note No change to current scoring.  Monitoring and action plans in place to manage risk.
Risk Opportunity
-Enhance reputation of Council
-Ensure services are fit for the future and are compliant with legislation changes
-Assets and service delivery (e.g. roads upgrade programme, vehicle replacement programme, greenspace
upgrade projects)
- Secure external funding for development of projects inc sustainable travel, net zero and public realm
improvements
- The continued implementation of the net zero cooperation agreement will maximise the opportunity to
reduce costs and carbon use.
Linked Actions Code & Title Progress Status Assigned To
R&N/25-26/GS/04 Develop a new local biodiversity action plan Ian Bain
R&N/25-26/R&T/06 Progress phased delivery of public and fleet electric
charging points – next phase Liam Greene
R&N/25-26/GS/05 Develop ash die back action plan – next phase Ian Bain
R&N/25-26/R&T/10 Develop new Roads and Transport Winter Plan for
consideration at May Committee Liam Greene
SR 10 Failure to maintain
Housing Stock
The risk that Council’s Housing Stock are not fully fit for purpose with
consequent adverse impact on our ability to deliver efficient and effective
housing for Council tenants.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
06-Jan-
2026 4 31-Mar-2027 4 Alan Young
Potential Effect
- Housing stock is not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
-Increase in reactive maintenance costs/ demand/ volume
-Housing stock in poor condition
-Housing stock fail to meet relevant standards
- Non-compliance with Scottish Housing Quality Standard
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of housing stock
-User satisfaction
-Operating costs and savings
- Local Government Benchmarking Framework (LGBF)
Risk Factors
- Adequacy of funding available to improve housing stock
- Adequacy of staff resources allocated to the management of housing stock
- Housing stock deemed to be unfit for existing purpose
-Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw
material costs, impacted on supply chains, and third parties and our ability to carry out works within
budget and on time.
Internal Controls
- Housing Capital Investment Programme (refreshed and delivered annually)
- Housing Capital Improvements
- WDC Local Housing Strategy 2021-25
- The Housing Capital Investment Team
- The Planned Maintenance Section
- Housing Asset Management Strategy
- Detailed asset database that shows relevant information on a property by property basis in relation to
HRA properties.
- More Homes Better Home Project Board.
- Telephone Survey feedback
- Fit for future reviews
-Other benchmarking/ feedback
- Climate Change Strategy
Latest Note No change to risk score, programme for investment and upgrades to council housing continues into 25-26
Page 74

Page 75

and a further five year programme to 26-30.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council housing stock
-Estate, assets and service delivery (housing investment programme )
-Improved satisfaction from tenants
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
-Improvement of SHQS & EESSH compliance performance and points, and reduced SHQS abeyance
numbers through the strategic planning and management of housing assets.
- Increase in environmental improvements including bin stores
- Increase in internal (e.g kitchens, bathrooms, showers, special needs adaptations, central heating, smoke
detectors, windows and doors) and external updates (e.g new roof coverings, external insulated render and
tenement structural refurbishments)
- Increase in number of New Build Homes as part of the Strategic Housing Investment Programme (SHIP)
-Achieve energy efficiency standard for social housing
Linked Actions Code & Title Progress Status Assigned To
HS/25-26/HAI/01 Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality Standard and reduce the
number of properties held in abeyance.
Alan Young
HS/25-26/HAI/02 Ensure the Council’s Housing stock progresses towards
the achievement of the energy efficiency standard for social housing. Alan Young
HS/26-27/HAI/01 Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality Standard and reduce the
number of properties held in abeyance.
Alan Young
HS/26-27/HAI/02 Ensure the Council’s Housing stock progresses towards
the achievement of the energy efficiency standard for social housing. Alan Young
SR 11 Inability to reduce
carbon footprint in line with
targets
The risk that the Council will be unable to achieve net zero emissions by
2045, both in relation to mitigating carbon emissions and adapting to the
impacts of climate change. Net zero refers to achieving an overall balance
between emissions produced and emissions taken out of the atmosphere. This
target has been developed in a way that mirrors the emission reduction
trajectory set by the Scottish Government in light of the Climate Emergency.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
14-Jan-
2026 9 31-Mar-2027 2 Alan Douglas; Amanda
Kean; Gail Macfarlane
Potential Effect
Failure to meet mandatory national and international policy drivers Failure to meet duties placed on Council
by The Climate Change (Scotland) Act 2009
Failure to meet duties placed on Council by The Climate Change (Emissions Reduction Targets) (Scotland)
Act 2019
Failure to meet duties placed on the Council by The Heat Networks (Scotland) Act 2021 and Local Heat and
Energy Efficiency Strategies (Scotland) Order 2022.
Failure to meet the provisions set out in Waste (Scotland) Regulations 2012 which help Scotland move
toward the objectives and targets set out in the Scotland’s Zero Waste Plan to help transition toward a
circular economy.
Reputational damage.
Financial burden of responding to adverse events such as extreme weather (including, but not limited to,
flooding, heat waves, wind driven storm events, etc.) resulting in action.  Impacts to Council operations
and supply chains as a result of adverse climate/extreme weather events.  This also impacts residents,
local businesses and wider infrastructure across West Dunbartonshire.
Financial burden on WDC from increasing energy prices in light of current energy and economic crises’. 
Energy Efficiency works on our own estate must increase to counteract these impacts.
Measures of
Impact
Improving organisational resilience against the impacts of climate change.
Improving local biodiversity through planting of native trees and bulbs in WDC
WDC Waste Services Citizens Panel Survey regarding attitudes towards recycling improving
The extension of the Queens Quay District Heating Network to NHS Golden Jubilee Hospital, Social Housing,
NHS Health Centre, Council buildings and further connections as per scope.
Inspiring change through including climate change learning in staff induction, training, team meetings, etc.
Uptake in e-learning modules on climate change.
Uptake in staff carrying out Sustainable Procurement assessments for tenders.
Page 75

Page 76

Ensuring climate change and sustainability metrics are included in tenders for suppliers/contractors/etc.
(such as carbon reduction measures) so they are being measured for accountability for the impacts they
have on the environment
Management of service areas setting climate change targets for their operations and staff.
The uptake of Green Champion roles, which help normalise Climate Change and Sustainability, practices
across the Council. Uptake in sustainable travel such as walking cycling and public transport
Risk Factors
Funding availability – delivery of actions to mitigate will require resources, capital works and investment by
the Council- e.g enhanced energy measures, and heating and renewables projects in both domestic and
non-domestic building assets
Budget stress – notably due to energy and economic crisis, meaning it’s more difficult for Council to set
aside budget to deliver on Climate Change and Net Zero projects and actions.
Funding approach – a combination of internal and external funding sources will be need to delivery climate
action at scale. Short term funding mechanisms such as annual payback of Council expenditure presents
difficulties for delivering long-term projects. Climate Change investments also need to take account of
whole-life costs including reduced maintenance costs and avoided Adaptation costs.
Internal capacity – limited staff time and availability, largely due to reduced Council budgets, further
impacted by Covid19.
Communication – both internally (to avoid ‘silo’ working) and externally (engaging with the public and
keeping abreast of local/national/international changes to policy).
Economics – some technologies, materials and skills are still very expensive so innovation must progress to
enhance the viability of climate actions within the context of the Council’s budget constraints.
Strategy and planning – all existing and future Council plans should place responding to the climate
emergency at their core and ensure integration with other Council services.
Legislation & Regulatory – the ability to implement some climate actions is constrained at the local level by
minimum standards and other restrictions set through legislation and national policy, for example in
relation to building regulations, planning and procurement.
Public attitudes and behaviours - Changing behaviour of residents, businesses and  stakeholders positively
and proactively, especially where there are cost implications to the delivery of climate actions.
Internal Controls
.          Climate Change Strategy 2021-2026
.          Action Plan 2021-2026
.          Climate Change Action Group (CCAG)
.          Pentana Risk Management System – devolved responsibilities of climate change
actions/milestones/KPI’s to service areas.
.          Scottish Government – Mandatory annual Climate Change Duties Reporting
.          Queens Quay District Heating Network
.          Strategic Environment Assessment (SEA)
.          Air quality monitoring
.          Converting some Council pool fleet to Electric Vehicles (EVs).
.          Climate Ready Clyde (CRC) – a cross-sector initiative funded by fifteen member organisations and
supported by the SG. Delivery of a Locale Heat & Energy Efficiency Strategy (LHEES) and delivery plan by
December 2023 – which sets out the Council’s area-based approach to reducing emissions of heating and
energy efficiency improvements to ALL assets across WD.  This includes private housing, businesses, etc.
which are not owned/operated by WDC.
.          Waste infrastructure and greatly improving approach to how Council and residents reduce, reuse
and recycle waste.  Notably, taking a Circular Economy approach to waste services and implementing
appropriate infrastructure and contracts to do so.
Latest Note
The Council's emissions for 2024/25 were reported in November 2025 showing significant progress; 33.8%
reduction on the previous year, 44.7% reduction on 2012/13 baseline and 5.7% ahead of projected target.
These are positive steps however the main reduction is from the Council's scope 3 waste emissions, which
is a result of shifting a significant amount of waste from landfill to incineration through the Net Zero
Cooperation Agreement with Glasgow City Council.
Both scope 1 and 2 emissions increased slightly for 2024/25 period. To reach a 61% reduction by 30/31 we
need to reduce a further 16.3% in just over five years and investment in required to reduce gas, electricity
and diesel consumption.
The long-term Climate Change Coordinator vacancy has been filled internally; this currently leaves another
vacancy within the energy team that will be filled as soon as possible. Participation from service areas has
increased at Climate Change Action Plan meetings and emission reductions actions and projects are
forthcoming. The Council also has the opportunity to utilise ClimateView and track trajectory to Net Zero,
allowing actions and projects to be prioritised and a more collective, strategic approach to be implemented.
The Strategic Risk will be reviewed at the next Climate Change Action Plan meeting in March 2026 for
relevance and an amended risk / set of risks will be reported to future meetings.
Risk Opportunity
Our local environment is protected, enhanced and valued rOur residents feels pride in their local
neighbourhood
The percentage of household waste sent for reuse, recycling and composting has increased resulting in
reduction in the percentage that was being landfilled.
The percentage of council land which promotes diversity of habitat and species has increased
Page 76

Page 77

Our resources are used in an environmentally sustainable way
Increase in the percentage of businesses taking action to reduce their carbon impact
Reduction in CO2 emissions under the Council’s influence
Reduction in West Dunbartonshire Area-Wide emissions as per requirements of the climate change
(Scotland) act
Residents actively involved in tackling climate change and protecting the environment
The economy and infrastructure become more low carbon and environmentally-friendly
Our neighbourhoods are sustainable and attractive
Increased investment in our housing stock including improving energy efficiency
Housing developments are meeting the needs of our changing population
The quality of neighbourhoods has improved
Our roads and transport network are maintained and they promote safe travel routes
Linked Actions Code & Title Progress Status Assigned To
R&R/25-26/025 Develop the Local Heat and Energy Efficiency Strategy
Delivery Plan Amanda Kean
R&R/25-26/024 Co-ordinate, monitor and report the progress of the
Council’s Climate Change Action Plan for 2025/26 Amanda Kean
Risk Status
Alert
High Risk
Warning
OK
Unknown