Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 6 June 2025
Back to Argyll and Bute Community Planning Partnership - Management Committee — 6 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE COMMUNITY PLANNING PARTNERSHIP -
MANAGEMENT COMMITTEE will be held in the THREE VILLAGES HALL, ARROCHAR on
FRIDAY, 6 JUNE 2025 at 10:00 AM, which you are requested to attend. 
BUSINESS 
1. WELCOME BY CHAIR (PIPPA MILNE) 
2. APPROVAL OF LAST MINUTES (Pages 3 - 16) 
3. AREA COMMUNITY PLANNING GROUP REPORT (Pages 17 - 26) 
4. CLIMATE CHANGE OFFICER REPORT (ANDY MACPHERSON) (Pages 27 - 34) 
5. COMMUNITY WEALTH BUILDING CHARTER (TAKKI SULAIMAN) (Pages 35 - 60) 
6. ICEBREAKER (JOHN MCLUCKIE) 
7. TRANSPORT AS AN ABOIP PRIORITY (RONA GOLD / JOHN MCLUCKIE) 
8. TRANSPORT IMPROVEMENTS IN THE PIPELINE (COUNCIL, TRANSPORT
SCOTLAND AND CALMAC) (Pages 61 - 72) 
9. BREAKOUT SESSIONS 
10. INTRO TO NEXT PRIORITY SESSION: HOUSING (IONA CAMPBELL) (Pages 73 -
78) 
11. FIRE SERVICE PRESENTATION ON SERVICE DELIVERY REVIEW FOR ARGYLL
& BUTE (GROUP COMMANDER BARRIE MCCUTCHEON) (Pages 79 - 86) 
12. CLOSE 
Argyll and Bute Community Planning Partnership - Management Committee 
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Classification: OFFICIAL
Minutes of the
Argyll and Bute Community Planning Partnership Management Committee
held at Council Chambers, Kilmory and online via MS Teams on 
Wednesday 16 April 2024 at 1000 
Present:  
Pippa Milne, Argyll and Bute Council
(ABC) (Chair)
Morag Goodfellow, Highland and Island
Enterprise (HIE)
Cllr Mark Irvine, ABC Takki Sulaiman, Argyll and Bute TSI
Rona Gold, ABC Colin Buchanan, Chair OLI ACPG
Patricia Dowd, DWP Sarah Davies, Chair HL ACPG
Mo McKenna, University of the
Highlands and Islands
Reeni Kennedy-Boyle, Vice Chair BC
ACPG
Joe McKay, Scottish Fire and Rescue Cllr Julie McKenzie, Vice Chair OLI
ACPG
Samantha Campbell, NHS Highland John McLuckie, ABC
Douglas Whyte, Argyll and Bute Council Mary Holt, ABC
Trish Robertson, Police Scotland Gill Simpson, Chair HL ACPG
Ranald Robertson, HITRANS Andy Macpherson, ACT
Stuart Green, ABC Graham Bell, NHS Highland Board
Lucy Dunbar, ABC Paul Ashworth, LiveArgyll
Milly Leggett, ABC Katie MacKenzie, ABC
Nicola Reaney, ABC (Secretary) 
Apologies:
Cllr Jim Lynch, ABC Cllr Anne Horn, ABC
Kirsty Flanagan, ABC Fergus Murray, ABC
Iain MacInnes, ABC Gary I’Anson, Police Scotland
Paul McCafferty, Scottish Enterprise Susan McRae, SDS
Liz Prior, NatureScot Alison McGrory, NHS Scotland
Evan Beswick, Argyll and Bute HSCP 
1. WELCOME AND APOLOGIES (CHAIR)
Pippa welcomed everyone to the meeting and apologies were noted as above. Pippa
welcomed new members to the CPP Management Committee (CPP MC) - Karen
Craib and Paul McCafferty from Scottish Enterprise, Trish Robertson from Police
Scotland, and Katie Mackenzie from the Council. 
2. MINUTES OF THE PREVIOUS MEETING - DECEMBER 2024 (CHAIR) 
The minutes of the previous meeting held on 6th December 2024 were approved. An
amendment was requested to the Area Community Planning Group (ACPG) update
that was part of the agenda pack for the December Meeting which includes concerns
raised by Oban, Lorn and the Isles (OLI) regarding the loss of funding to the Living
Well Network which were also made by the Helensburgh and Lomond (HL) ACPG.
The amendment was noted and will be incorporated into the last minutes.
3. REVIEW OF ACTION LOG (RONA GOLD) 
Rona Gold provided an update on the action log, highlighting the progress made on
various actions and identifying those that are still ongoing:
Page 3 Agenda Item 2

Page 4

Classification: OFFICIAL
- Partner offers of support to LOIP actions will be discussed further in this
meeting.
- Engagement with Colin on Transport Research. Colin raised the importance of
including community councils in transport research. Rona noted this has been
incorporated into the planning work and the action remains ongoing to ensure
thorough engagement and completion.
- Fair Funding guidance will be discussed further in this meeting, including work
on a local statement on this by Takki.
4. AREA COMMUNITY PLANNING GROUP UPDATES (JOHN MCLUCKIE) 
John provided an overview of the ACPG reports from rounds of meetings held in
February. He highlighted key points from the meetings, including concerns raised by
partners at the Helensburgh and Lomond ACPG regarding the switch off of the Radio
Teleswitch Service (RTS) and the Public Switch Telephone Network (PSTN). Pippa
confirmed that Iain MacInnes will provide an update to ACPGs on this. 
Governance arrangements were considered and adopted for next year, including the
terms of reference and membership. The Oban, Lorn and the Isles (OLI) ACPG
agreed to establish a short-term working group to explore community resilience
requirements as a result of climate change. There was also a change in meeting
dates for the Bute and Cowal (BC) and Helensburgh and Lomond (HL) ACPGs due
to the Scottish parliamentary elections.
Mid Argyll Kintyre and the Isles (MAKI) ACPG raised concerns regarding the new
reporting format by the Police to their meetings. 
ACTION – Trish to investigate the reporting from the Police to MAKI ACPG and
improve that going forward. 
Sarah (HL ACPG), Reeni (BC ACPG) and Colin (OLI ACPG) raised concerns about
the lack of consultation on the decision to end the Living Well Networks’ funding.
Samantha agreed to provide an update on the work from NHS Highland of the
developments regarding the cessation of funding to the Living Well Networks, and
will provide details of the future support that will be available at the next round of
ACPG meetings. She confirmed that Health Equalities Impacts Assessments had
been carried out in advance of the decision to withdraw the funding.
ACTION – Information on the cessation of Living Well Networks funding to be
recirculated to ACPG members and any feedback on gaps this has caused to
be fed back to HSCP.
ACTION – Argyll and Bute HSCP to present an update on the Living Well
agenda at the next round of ACPG meetings
Pippa thanked the ACPGs for their continued work in the local areas.
5. COMMUNITY PLANNING SELF-ASSESSMENT DRAFT IMPROVEMENT PLAN
(RONA GOLD)
Rona provided an overview of the draft improvement actions from the March 21st
session with the Improvement Service (IS). The plan includes draft improvement
Page 4

Page 5

Classification: OFFICIAL
actions for the next 15 months and Rona emphasised the importance of getting
feedback and consensus on the improvement plan with volunteers sought for
specific actions;
- Undertake mapping to understand mechanism each partner has in place to
understand communities’ needs (due by December 2025). Rona suggested
that partners could join the existing Council Engagement Strategy Group
(CESG) to take this forward rather than create a separate meeting. Partners
agreed to that approach to prevent duplication of efforts, and they were asked
to volunteer people to attend. Fire and Police advised representatives from
their organisations would attend and Takki also noted that the TSI have an
upcoming strategic consultation exercise and would like to engage with the
CESG on questions for that. Andy also expressed an interest to join the
CESG as he has completed extensive consultation as part of the Climate
Change Strategy work. Rona confirmed that engagement on this would be
undertaken with the ACPGs via the Chair / Vice Chair meetings to then
feedback into the CPP MC. Douglas was also keen to be involved to
understand how better to engage with Community Councils. 
ACTION – Rona to pick up with Colin on how best to establish a point of
contact for engagement into local groups.  
Colin asked if Takki would be engaging with the Development Trusts, Scottish
Islands Federation and Scottish Islands Trust as part of the TSI consultation.
Takki confirmed the intention was for the consultation and scoping to be a
large process that would be thorough and that every part of our communities
would be involved to provide data on the current state of the third sector and
how the TSI can best support that.  
- Officers supporting ACPGs to understand what is beneficial from them within
the meeting schedule and agendas to build a feedback loop - Rona noted
work on this has already started and asked the ACPGs to consider if they
would like to have separate meetings on this or to tie it into existing ACPG
Chair and Vice Chair meetings.  The consensus at the meeting was to do this
using existing meetings and that it could be reviewed and changed in the
future if required. 
- Encouraging active citizenship in communities to take part in the CPP – How
to refresh and explain what CPP is, showing groups and individuals how they
can influence CPP and demonstrate good news stories. Looking at how to
engage with community councils to see if they can support in leading this.
Rona will be meeting with the Council Governance Manager to see how we
can work with better with Community Councils then set up a short life working
group (15 months) to move action forward. Reeni suggested that it would be
good to engage with Jean Moffat, convenor of Bute Community Council and
Area Community Planning Group Chair as she has existing strong links with
other community councils. Rona welcomed volunteers to join this group. Colin
and Sarah said they would ask for volunteers from their respective ACPGs.
Andy was also keen to join this group as community resilience plans were a
good “jumping off point” for discussions with Community Councils. 
Page 5

Page 6

Classification: OFFICIAL
- Engaging directly with Community Councils – Rona took agreement from the
attendees that this action was tied into the above. 
- Considering partnership approach to board member induction – A working
group will be set up to take forward planning face to face development
sessions in the year. These sessions need to be valuable and Rona asked for
volunteers to work with her and John to get the content of those sessions
right. Reeni suggested contacting Ailsa Clark at Inspiralba as they have been
offering facilitated Art of Hosting sessions that were engaging and created fun
and challenging conversations.  Sam noted her team may also be able to help
with this. Rona advised the next development session would be incorporated
into a longer meeting of the already scheduled CPP MC on 6 June. 
ACTION – Partners to offer any content suggestion for development
days to cppadmin@argyll-bute.gov.uk 
Rona will also work with IS to take good practice from other CPPs. Rona
suggested adding this to future CPP MC meeting agendas and offered to
send round case studies on what is happening in other CPPs. Sarah noted
that Gill Simpson would be happy to work on improvements to the CPP
Welcome Pack. Rona added that the first CPP podcast was about to go live. 
ACTION – John to forward case studies from other CPPs to partners. 
ACTION – Volunteers are welcomed from Partners to record a podcast
with John. 
- Establish a short life working group to develop process for partners to do
when handing over to someone else in your organisation. Mo was keen to be
involved in this from public sector perspective. Sarah nominated Gill to be
involved and Colin also volunteered to be part of this group. Trish highlighted
the usefulness of the Welcome Pack and Rona suggested good practice
could be learned from existing handover processes in place within the Police. 
Pippa said that the feedback from multiple partners was that the IS session was very
positive and created really helpful actions to focus the delivery of improvements. 
6. ARGYLL AND BUTE OUTCOMES IMPROVEMENT PLAN 2024-2034 - NEXT
STEPS (RONA GOLD / JOHN MCLUCKIE)
Rona and John gave a presentation on ABOIP priorities and next steps, saying there
is a really good understanding on the priorities (Transport Infrastructure, Community
Wellbeing and Housing) due to the engagement process. 
At the end of 2024, the CPP agreed what the actions coming under the priorities
would be (shaped from our understanding of need) and agreed the long-term
objectives. The full set of actions was shared as part of the December 2024 CPP MC
agenda pack Item 10(b). Rona asked for a consensus from the CPP on the proposed
actions and measures, what the CPP can add value to, and asked the CPP to
familiarise themselves with the information ahead of a further session on this at the
Page 6

Page 7

Classification: OFFICIAL
June CPP MC to approve the actions, agree on how the work will be project
managed and finalise project mandates before the projects are initiated.
ACTION - Any concerns or comments on the ABOIP priority actions can be
sent to cppadmin@argyll-bute.gov.uk. 
• Rona gave the meeting an example of how the 5 actions, outputs and
measures were created under the Transport priority, noting that they would be
approved at the June meeting. The actions were (1) Establish a transport
integration working group, (2) Consider establishment of community active
travel network, (3) Research commissioned to understand areas of transport
related inequalities and to create baseline for measuring successful delivery
of this objective, (4) Work with ACPGs to promote the local options for car-
pooling/sharing and (5) Incorporate EV suggestions within CPP Climate
Change Strategy.
Reeni shared a link in the meeting chat to research being undertaking in local
communities in the area of active travel and accessibility in the public realm. Sarah
also noted that transport was a big issue arising from the Local Place Plan (LPP)
event held in Helensburgh and the need to work with partners to address specific
transport issues in that area. Rona advised that she has developed a cross council
working group on LPPs and can pick that up in June as to how LPPs feed into
transport actions plans and will also bring that to the ACPG meetings in May.  Colin
asked for the strategic review of ferries to be included in the discussions at the June
meeting.
Ranald commented in the chat that he could see how HITRANS can support this
work, advising that Active Travel Masterplans have been prepared for Oban,
Lochgilphead, Ardrishaig, Tarbert, Campbeltown, Rothesay and Dunoon. He added
that he thought the baseline work will be important to capture the scale of transport
poverty in Argyll and Bute.
7. PROJECTS
(a) CPP Climate Change Strategy and Action Plan (Andy MacPherson) 
Andy gave a presentation on the Argyll and Bute Climate Action Strategy. The
strategy aims to make Argyll and Bute climate-ready by acting together to
understand and adapt to the changing climate. The strategy includes six priority
areas: infrastructure, policy influence, skills and supply chain, resilience, risk
assessment, and cross-cutting themes. Community resilience was highlighted as a
key area where the CPP can make a significant impact and the importance of
developing local resilience plans was emphasised, with a focus on using local
knowledge to inform risk assessments. Andy discussed the legacy of the project and
suggested developing a funding application to provide ongoing support on action
delivery, potentially using the lottery Climate Action Fund as a project proposal
model.
The strategy document and terms of reference were approved by the CPP MC. The
next steps include finalising the action plan with a foreword from the CPP MC Chair,
consideration of how it integrates with other CPP priorities and action to include
climate aspects in community resilience plans. The work by Andy was widely praised
Page 7

Page 8

Classification: OFFICIAL
by the CPP MC members with Pippa noting that it was no mean feat to take so much
information and distil it to something that is achievable. The links to community
resilience were clear especially after how recent extreme weather had affected our
communities. 
ACTION – Partners that would like support as to how they can contribute to
action delivery for the plan can contact Andy at andy@act-now.org.uk. 
Reeni said that the CPP MC should consider submitting the plan to the Scottish
arliament working group on climate to highlight to them the excellent work being
undertaken in Argyll and Bute, highlighting our longer term aspirations at that level to
assist in lobbying for future support. This was agreed. Rona added that the
partnership working to bring together resources to complete this work was worth
showcasing.
ACTION – CPP MC to submit Climate Action plan to Scottish Parliament
climate working group.
Rona asked if action could be taken forward by considering at the June meeting
where climate actions sit under the three ABOIP priority headings – rather than
creating separate workstreams. Rona also asked how quickly could funding
applications be resourced for Andy to continue work on the action delivery. Rona
noted that if there is agreement to investigate funding to continue Andy’s post then
the Climate Change Steering Group can take that forward for agreement at the CPP
MC. Pippa suggested that be taken off table. 
Andy asked to record a note of thanks to Stan Phillips for all his work in producing
the Climate Strategy. Rona added that Stan was an integral part of the steering
group of partners that worked on this plan.
(b) CPP Community Wealth Building (CWB) Short Life Steering Group - CWB Bill
(Takki Sulaiman / John McLuckie)
Takki highlighted the commissioned report from CLES on CWB last year which
included 23 recommendations for CWB action in Argyll and Bute. A steering group
was set up to deep dive into how those actions could be progressed meaningfully
with a range of partners in attendance. Of those 23 actions, there is a need to
prioritise those that can have the biggest impact. In this locality, the biggest impacts
come from those related to the Procurement pillar. 
The steering group also discussed the CWB Bill and Takki noted there is an
opportunity to respond to consultation on this (individually and collectively as a CPP)
by 23 May 2025. A draft response to this has been drafted and can be shared. Takki
advised the collective feeling in the steering group was that work should continue on
the creation of a local CWB charter, even before the CWB Bill becomes law, and
advised the steering group plans to bring a set of priorities and a draft charter to the
CPP meeting on June 6th for discussion and approval.
ACTION – CWB Steering Group to bring set of priorities and draft charter to
6th June meeting.
Page 8

Page 9

Classification: OFFICIAL
John then gave an overview of the CWB bill published at end of March which looks
to ensure consistent implementation of Community Wealth Building across Scotland.
It includes provisions for the preparation of an action plan, guidance and a list of
specified public bodies that must have due regard to the guidance. There is a
specific section in the policy memorandum of the Bill that mentions CPPs. 
Rona highlighted that the bill proposes duties for local authorities rather than
community planning partnerships and asked for the steering group’s perspective on
this and how it aligns with the CPP’s actions and how to ensure a way forward all
partners are in agreement with. 
Takki responded that the steering group was surprised that the duties fell to local
authorities, and believe the CPP should be the driver for CWB. The steering group
felt that the bill had too much of an economic development focus and not enough on
community ownership and well-being. He also noted that there will be a need for
additional resources to implement CWB effectively and that there was definitely room
for comments to be made on the Bill content and proposed leadership structure. 
Pippa thanked Takki and John for the update on this key bit of legislation and
encouraged partners to provide feedback on the Bill. Pippa also asked if the actions
for CWB could be captured as part of the ABOIP priority actions to ensure ongoing
momentum is maintained.
ACTION – Draft response to government on CWB bill to be sent to Partners for
responses by 16 May.
8. PARTNERSHIPS REPORTING TO CPP (ANNUALLY OR BY EXCEPTION) -
COMMUNITY JUSTICE (MARY HOLT) 
Mary provided an overview of the draft Community Justice annual report and
suggested distributing the final version of the Community Justice Plan to the
Community Planning Partnership (CPP) for consultation rather than scheduling time
in the busy June meeting. 
ACTION – Mary to forward the final version of the Community Justice Plan for
consultation to the CPP MC.
Mary noted the main statutory partners involved in the Community Justice
Partnership and pointed to the definition of Community Justice (page 96),
emphasising its long-standing presence and the integration of various organisations
like the police, justice social work, and courts at a local level.
Mary acknowledged the lack of funding for improvement work and the need to work
within current resources, noting the importance of linking community justice work
with CPP priorities such as transportation and community well-being, and suggesting
that community justice could join existing CPP workstreams rather than setting up
separate ones. She also noted the linkages with ACPGs as they look to develop
Community Justice into place based approaches – community service, prison
releases, employability etc. 
Page 9

Page 10

Classification: OFFICIAL
Community Justice has a large portfolio but has no funding from improvement work,
and Mary is keen to develop what can be done with current resources and what is
unable to be delivered because of that. 
Pippa thanked Mary for the challenging bit of work. Services are not readily available
in our remote rural geography and it is important that we creatively look at how this
can be integrated into the priorities while being action focussed.  
ACTION – Mary to bring proposal on how to integrate Community Justice into
ABOIP priorities to September meeting.
9. PARTNER UPDATES - CLD STRATEGIC PARTNERSHIP PLAN (PAUL
ASHWORTH) 
Paul Ashworth presented the Community Learning and Development (CLD)
Partnership Plan highlighting significant progress and developments since the HMIE
progress visit last year. The plan, overseen by Live Argyll and the CLD Strategic
Partnership, was developed through extensive consultation, receiving over 900
responses. The partnership agreed to focus on six key themes for the 2024-2027
plan: digital skills, core skills for learning, life and work, health and well-being,
community voice, the Live Argyll offer, and improving partnership work. Effective CLD
relies on joint ownership and commitment from all partners.
Paul asked the CPP MC to note the response to the HMIE progress visit in January
2024. The inspectors highlighted the need for significant improvements in the plan's
outcomes, ensuring they were measurable and aligned with updated local and
national policies. In response, the CLD team delivered several CPD training sessions
to stakeholders and CLD workers, focusing on measuring, evaluating, and reporting
both quantitative and qualitative data related to specific outcomes. This training
increased confidence and understanding among attendees, leading to positive
feedback and a commitment to continue to develop key skills and improve how work
as partnership.
Additionally, the partnership developed a performance tracker encompassing
performance reporting on outcomes, baseline data, timelines, and a RAG-rated
system to track risks. This tracker supports the collective strategic improvement work
of the partnership, ensuring transparency and opportunities to evaluate progress and
plan necessary interventions.
Paul also provided an update on the HMIE feedback a year after the progress visit.
The report recognised a strong partnership approach in Argyll and Bute, and the
inspectors were confident that significant progress had been made, leading to the
official sign-off of the inspection with no further actions required. This positive result
was a testament to the hard work of the CLD partnership team and the operational
teams involved. Paul also noted the internal audit carried out by Argyll and Bute
Council, which reviewed the effectiveness and equity of service provision across the
region. The audit provided high-level assurance of Live Argyll's management,
confirming strong internal control, governance, and risk management.
ACTION – Paul to forward final HMIE update report to Partners once available. 
Page 10

Page 11

Classification: OFFICIAL
In conclusion, Paul expressed satisfaction with the progress made in aligning the
CLD plans with updated measurement and performance criteria, supported by
training and the new performance tracker. The annual report for 2024-2025 is being
prepared and will be published in August, with further updates to be provided to the
committee.
ACTION – Paul to present CLD Annual Report to September CPP MC.
Sarah asked Paul if the temporary re-siting of the library had led to any detrimental
effect on CLD provision. Paul confirmed that this has had no negative effect and
alternative arrangement have been put in place. 
Pippa commended the good work carried out to get the close out of the HMIE
inspection. 
10. ASPIRING PLACES DEMONSTRATION (STUART GREEN / LUCY DUNBAR /
MILLY LEGGETT)
Stuart Green, Lucy Dunbar, and Milly Leggett provided an overview and
demonstration of the platform highlighting its purpose, functionality and benefits for
community groups and organisations in Argyll and Bute.
Stuart gave an overview of the Aspiring Places project, which aims to support
community groups by raising awareness of their project proposals, building
connections across Argyll and Bute and preparing for / linking to external funding
opportunities. The platform was constructed by the end of December and underwent
a successful pilot phase, receiving positive feedback from participating community
groups. The feedback indicated that the platform was user-friendly, straightforward,
and easy to navigate, particularly in terms of registration and login processes.
Lucy demonstrated the Aspiring Places site which was launched on March 24th. 28
community groups and organisations had registered for an account, and 10 project
proposals had been submitted to the Project Bank - with five more in draft form. The
home page of Aspiring Places provides a high-level description of the platform and
its vision. The information and guidance on the site are organised into a three-step
process: identifying who can take part and the types of projects sought, providing
written and video guides to help groups create their project proposals, and
signposting resources to help groups take the next steps with their projects.
Milly then walked through the project proposal form explaining the required and
optional fields that groups need to complete to upload their project proposals. Once
the required fields are completed, groups can save their proposals in draft form and
edit them as needed before publishing.
Lucy showcased the Project Bank where all submitted project proposals are
displayed on a map with pins indicating their locations. Users can zoom in and out,
click on pins to view project details, and filter projects by categories.
A key feature of Aspiring Places is its ability to connect community projects with
external funding opportunities. Lucy and Milly explained the new process they
developed to support this connection, which involves promoting funding opportunities
to groups on Aspiring Places and providing a simple way for groups to express
Page 11

Page 12

Classification: OFFICIAL
interest in relevant funding. They demonstrated how a project proposal can be
copied from Aspiring Places to a funding opportunity with a few clicks, saving time
and effort for both community groups and Council officers.
Douglas raised a query about housing-related projects on the platform and asked
how they are co-ordinating with the Council's housing services. Lucy responded by
explaining the cross-Council Officers Forum was used to ensure that all projects are
shared collectively with relevant teams across the Council and offered to provide
further details to Douglas on all housing projects on the site. 
ACTION – Aspiring Places team to send all housing project proposals to
Douglas Whyte. 
Sarah thanked Lucy and Milly for coming to an engagement event in Helensburgh to
talk about the project. Reeni and Colin congratulated the team on the launch of an
impressive platform. 
Sarah asked if all project proposals coming out on LPPs should be loaded on the
site. Stuart responded that loading a project was relatively straightforward and quick,
and there are no limits to how many projects a group can capture. He is also happy
to engage with any groups that would like any further guidance or support on how to
use the platform.
Pippa said with group feedback there may be the option to develop further functions
on the site. Pippa thanked Stuart, Lucy and Milly for the demonstration.
11. FAIR FUNDING GUIDANCE FEEDBACK (RONA GOLD / TAKKI SULAIMAN)
Rona and Takki provided an update on the progress and next steps on this initiative.
Rona noting the Community Planning Improvement Board had produced fair funding
guidance which the CPP had agreed to consider for sign-up. This guidance was
intended to improve funding processes and strengthen the community and third
sector. The guidance had been previously sent out to all partner organisations for
review but there had been no responses received. The initial timeline ask might have
been too short so the guidance would be resent giving partners would be given more
time to review and provide feedback. Rona proposed that the discussion on signing
up to the guidance be moved to the September meeting, to allow sufficient time for
thorough consideration.
ACTION – Fair Funding Guidance to be resent to Partners. Item to be added to
September CPP MC.
Takki emphasised the importance of the fair funding guidance, noting it was
something the committee had broadly agreed upon in December to improve funding
processes and improve the strength of our community and third sector. Takki would
like to see the national guidance turned into a practical toolkit or handbook for
commissioning managers. This would help managers understand how to enter into
partnerships with local third sector and community organisations, considering the
unique context of Argyll and Bute, where many groups are small and may require
capacity building and support for sustainable funding. He welcomed further input
from other committee members and stressed the need for the guidance to be useful
and practical for those designing service delivery models.
Page 12

Page 13

Classification: OFFICIAL
Pippa added that while some organisations might find it challenging to comply fully
with the guidance immediately, it was important to sign up to the principles and work
towards compliance to commit to a journey towards better funding practices, even if
they were not yet fully compliant.
12. AOCB
(a) National policy and community planning (Rona Gold)
ACTION – Rona to send a link to the Improvement Service national CPP self-
evaluation report. 
13. DATE OF NEXT MEETING AND CLOSE (CHAIR)
Pippa thanked everyone for their attendance and contributions. 
The next CPP Management Committee Meeting will be held on Friday 6th June
2025. 
Page 13

Page 14

Classification: OFFICIAL 
CPP DEVELOPMENT MANAGEMENT COMMITTEE ACTION GRID – 16 April 2024 
Complete  In
Progress 
Outstanding  Please highlight actions as per traffic light system to show progress  
Date
Set
Action Who Required by
Date
6/12 Partner offers of any support to the delivery of the LOIP recommended actions to be sent to
cppadmin@argyll-bute.gov.uk
All 7 March 2025
6/12 John to engage with Colin around community council input to the research. John 7 March 2025
6/12 All members to consider the Community Planning Improvement Board guidance and return
any feedback to cppadmin@argyll-bute.gov.uk for discussion at the March 2025 meeting to
enable a whole CPP endorsement to be considered.
All 7 March 2025
6/12 Takki to suggest a statement (to John) on fair funding that is a draft that the CPP can
consider signing up to alongside the above ask to consider the guidance for Third Sector.
Takki 19 Sept 2025
16/4 Trish to investigate the reporting from the Police to MAKI ACPG and improve that going
forward.
Trish Complete
16/4 Information on the cessation of Living Well Networks funding to be recirculated to ACPG members
and any feedback on gaps this has caused to be fed back to HSCP.
CPP Team Complete
16/4 Argyll and Bute HSCP to present an update on the Living Well agenda at the next round of ACPG
meetings
Argyll and
Bute HSCP
In progress 
16/4 Rona to pick up with Colin on how best to establish a point of contact for engagement into
local groups to understand community needs.
Rona In progress
16/4 Partners to offer any content suggestion for development days to cppadmin@argyll-
bute.gov.uk
All In progress
16/4 John to forward case studies from other CPPs to partners. John In progress
16/4 Volunteers are welcomed from Partners to record a podcast with John. All In progress
16/4 Any concerns or comments on the ABOIP priority actions can be sent to cppadmin@argyll-
bute.gov.uk.
All In progress
16/4 Partners that would like support as to how they can contribute to action delivery for the plan can
contact Andy at andy@act-now.org.uk
All In progress
16/4 CPP MC to consider submitting the Climate Action plan to Scottish Parliament climate
working group.
All In progress
Page 14

Page 15

Classification: OFFICIAL 
Date
Set
Action Who Required by
Date
16/4 CWB Steering Group to bring set of priorities and draft charter to 6th June meeting. Takki In progress
16/4 Draft response to government on CWB bill to be sent to Partners for responses by 16 May. All Complete 
16/4 Mary to forward the final version of the Community Justice Plan for consultation to the CPP
MC.
Mary In progress
16/4 Mary to bring proposal on how to integrate Community Justice into ABOIP priorities to
September meeting.
Mary 19 Sept 25
16/4 Paul to forward final HMIE update report to Partners once available. Paul 19 Sept 25
16/4 Paul to present CLD Annual Report to September CPP MC. Paul  19 Sept 25
16/4 Aspiring Places team to send all housing project proposals to Douglas Whyte. Stuart In progress
16/4 Fair Funding Guidance to be resent to Partners. Item to be added to September CPP MC. CPP Team 19 Sept 25
16/4 Rona to send a link to the Improvement Service national CPP self-evaluation report. Rona In progress 
Page 15

Page 16

This page is intentionally left blank

Page 17

Classification: OFFICIAL
Management Committee
Date: 06 June 2025
Agenda Item: 
Area Community Planning Groups – May 2025 Meetings
1. Purpose 
This paper highlights the key matters arising during the Area Community
Planning Group (ACPG) meetings that were held in May 2025. 
2. Recommendations
The Management Committee is asked to note:
a) The highlights from the meetings detailed at section 4 of the report. 
b) The reappointment of Reeni Kennedy-Boyle, Fyne Futures, as Vice Chair of
the Bute and Cowal Area Community Planning Group. 
c) The resignation of Sarah Davies as Chair of the Helensburgh and Lomond
Area Community Planning Group. 
3.     Background
There are four Area Community Planning Groups, one in each of the Council’s
administrative areas (Bute and Cowal; Mid Argyll, Kintyre and the Islands;
Helensburgh and Lomond; and Oban, Lorn and the Isles). 
Meetings were held on a variety of platforms, including purely virtual and on a hybrid
basis using Microsoft Teams.  
Prior to the meetings, discussions took place with the Area Chairs and Vice Chairs
and a standard agenda template was agreed.  All four meetings were well attended
by a variety of partners. 
4.     Highlights
All Groups considered:
4.1 Argyll and Bute Outcomes Improvement Plan – Transport Infrastructure 
Page 17 Agenda Item 3

Page 18

Classification: OFFICIAL
Each ACPG gave consideration to a presentation from the Community
Planning team on the transport infrastructure priority and the actions being
developed to tackle transport-related inequalities.
Group members were invited to provide a verbal or written response to a set
of questions linked to the long-term transport infrastructure objectives agreed
by the CPP Management Committee.
The Community Planning team intimated that the feedback from the four Area
Community Planning Groups would be collated and fed into further discussion
at the CPP Management Committee session on 6th June. 
4.2 Argyll and Bute CPP Climate Change Strategy and Action Plan 
Andy MacPherson from ACT provided an update on the approval of the CPP
Climate Change Strategy and on the approach to developing the associated
Action Plan. 
Andy highlighted the importance of the resilience strand within ongoing work,
options for future funding and a further offer to engage with local groups. 
4.3 Scottish Fire and Rescue Service Update 
The Scottish Fire and Rescue Service’s (SFRS) quarter 4 report presented
details of local performance across Argyll and Bute for the period 2024-25.
The report included updates on accidental dwelling fires, deliberate secondary
fire setting, fires in non-domestic properties, casualties from fire and non-fire
emergencies, unwanted fire alarm signals, while highlighting community
engagement and Local Senior Officer activities.  It was agreed that reporting
on wildfires would be incorporated into future quarterly reports.
Members were also advised that a Service Delivery Review had been
undertaken with a public consultation opening at the end of June 2025 to
consider a range of proposals. 
4.4 Police Scotland Update 
Police Scotland provided information on the ongoing work of the service and
information on serious and organised crime, acquisitive crime, road safety and
road crime, violent crime, public protection, highlighting in particular local
policing and community engagement activities. 
4.5 Argyll and Bute Health and Social Care Partnership 
Argyll and Bute Health and Social Care Partnership’s Public Health Team
provided an update on the ongoing wellbeing and prevention activities
overseen and delivered by them in Argyll and Bute. 
The update highlighted Mental Health Awareness and Suicide Prevention 
training, Speakeasy training and small grants awarded to five sectoral 
organisations to promote knowledge and understanding of national screening 
Page 18

Page 19

Classification: OFFICIAL
programmes. 
Concern were raised at the Helensburgh and Lomond ACPG regarding the 
resilience of telecare centres during lengthy power outages and whether
checks were being carried out on individuals affected by the smart meter
switchover. 
It was agreed an update on both these issues would be provided at the
August meeting. 
4.6 Argyll and Bute TSI Update 
The update from Argyll and Bute TSI provided information on Scottish
Government lobbying carried out on third sector issues including fair funding,
investment in prevention, and public sector reform; the 2-year funding now
offered through the community mental health fund; the forthcoming joint event
with Scottish Poverty Alliance and the Annual Volunteer of the Year awards in
Rhu. 
4.7 LiveArgyll update 
Each ACPG was provided with an update on local LiveArgyll activity including 
P7 transition work with rural schools in Cowal, the Community Learning Hubs 
in Mid Argyll and Kintyre which continue to offer support and accredited 
learning opportunities, a new group for young people in OLI and adult 
leaning provision and youth work in the Helensburgh area.
The concern raised at the Helensburgh and Lomond ACPG regarding a 
proposed reduction in library and leisure services provision will be addressed 
through the Communities and Partnership Manager communicating and 
meeting with a senior LiveArgyll manager. 
4.8 Argyll and Bute Council – Community Development update 
An update was provided by the Community Development Officer for each
area highlighting the Supporting Communities Fund, forthcoming Funding
Connections Roadshows and the range of work ongoing to support
community groups. 
5.0 Bute & Cowal (Meeting Papers - LINK)
The group considered a report from Stuart McLean outlining information relating to
the appointment of a Vice Chair for the Bute and Cowal Area Community Planning
Group.  It was agreed that Reeni Kennedy-Boyle, Fyne Futures, be reappointed as
Vice Chair of the group. 
Francesco Bertoldi delivered a presentation on the development and renewal of the
Scottish Government’s National Islands Plan.  Group members noted that the new
Page 19

Page 20

Classification: OFFICIAL
plan contains fewer strategic objectives and commitments with a greater focus on
allocation of responsibiities and the provision of a dedicated resource and capital
budget. 
An update was provided by Fyne Future which included information on their 20th
anniversary of being a charity and social enterprise, ongoing employability and
volunteering work and plans to become Scotland’s first island-based community
supported agriculture scheme. 
The group considered the annual update from Argyll Community Housing
Association (ACHA) which included information on housing stock in Bute and Cowal,
work undertaken with communities; sheltered housing; allocation and reletting of
properties; customer involvement strategy and an update on their plans and
performance benchmarking. 
Ann Campbell from Dunoon Community Development Trust spoke to a report which
provided the background to the development of a Local Place Plan for Dunoon and
Kirn which the Trust aims to submit for validation by November 2025. 
Consideration was given to an update from Transport Scotland which highlighted the
ongoing works at the Rest and Be Thankful, completed works along the A83
including resurfacing and signage at Cairndow, ongoing works on the A82, routine
maintenance works and upcoming works for resurfacing, drainage improvement and
the rollout of 20mph zones at Arrochar and Tarbet. 
A written update from UHI Argyll included information on an open week held in
March, the Modern Apprenticeship Programme which welcomed 73 new apprentices
over the past year, short courses, commercial courses and plans for the Academic
Year 2025-2026. 
An update was provided on behalf of South Cowal Community Council following the
formal approval of a development trust for the South Cowal area.  The purposes of
the trust include the prevention or relief of poverty, the advancement of education,
the advancement of citizenship or community development, the provision of
recreational facilities or the organisation of recreational activities, and the
advancement of environmental protection or improvement. 
The group considered and noted the contents of a presentation delivered by the
Area Plans team on the Aspiring Places portal, a new digital space for community
groups and organisations across Argyll and Bute to share information about projects
that they would like to carry out. 
6.0 Helensburgh & Lomond (Meeting Papers - LINK)
The group gave consideration to a presentation by Sodhi Dhillon, EE and BT Digital
Voice Engagement Lead for Scotland, which provided background information on the
Public Switched Telephone Network switch-off and the replacement broadband-
based Digital Voice. Sodhi highlighted how BT will identify vulnerable customers and
Page 20

Page 21

Classification: OFFICIAL
how they would be supported during the transition, and it was noted that a dedicated
landline service would continue to be provided for customers without broadband. 
Ashley MacKay, Argyll and Bute Council’s Contract and Demand Management
Officer, spoke to a report and presentation on community benefits, highlighting
achievements during financial year 2023-24 and during the first two quarters of
2024-25.  Ashley highlighted the definition of community benefits, outlined the
Council’s aims and implementation methods, and presented detail on how
procurement methods which include community benefits can maximise social,
economic and environmental benefit to local communities. 
The group noted the update from Transport Scotland which highlighted the ongoing
works at the Rest and Be Thankful and between Tarbet and Inverarnan, as well as
ongoing work on other sections of the A82 and the rollout of 20mph zones at
Arrochar and Tarbet. 
Consideration was given to a report by Fun First which highlighted existing and
upcoming sessions for pre-school children and their parents including new outdoor
sessions and summer holiday sessions, details of staffing changes and fundraising
activities, and the opportunity for new volunteer members to join the committee. 
Sarah Davies spoke to a written update from Helensburgh Community Council which
included information about the Local Place Plan, a proposed banking hub, the Music
in the Square Fund, participation in the Visitor Levy consultation, participation in
resilience training, and the success of the Save the Tower Arts Centre in securing
funding for a community buy-out. Sarah also advised that there were four vacancies
on the Community Council and that they would be looking to co-opt members at their
AGM which was being held on the last Thursday of the month. 
A written update from Rhu and Shandon Community Council included information
about the Local Place Plan, a WaterBlitz event and the establishment of a new
charity, Rhu and Shandon Community Trust in response to managing the community
purchase of Ardenconnel Wood. 
The group considered a report from Destination Helensburgh which highlighted
achievements in social media, media advertising and through their Visitor
Information Centre and website, as well as activities completed since the
organisation started in 2021. 
An update from Angela Anderson, Plastic Free Helensburgh, provided details on the
recent work carried out by beach clean-up teams, and highlighted a project to test
water quality at Helensburgh Pier for a year. Angela Anderson also advised that
Time for Change had a new initiative to connect with farmers via stalls at agricultural
shows to find out how policy decisions were affecting them, and to seek their input
on climate change. 
Becky Hothersall, Poverty Alliance, updated the group on work with Argyll and Bute
Council and TSI on the Taking Action on Rural Poverty project (TARP) which hosted
a quarterly anti-poverty meet up for groups where the cost of living is an issue.  It
Page 21

Page 22

Classification: OFFICIAL
was noted that the next meeting would focus on applying a human rights lens to
combat poverty in communities, focusing on transport and food.
Becky advised that the Poverty Alliance also coordinates a citizens panel to create
opportunities for people with lived experience of living on a low income or having
high costs due to their rural location, noting that the panel members were keen to
contribute to a broad range of work, particularly on the topics of food costs and
community resilience to extreme weather. 
Allan Comrie of Strathclyde Partnership for Transport (SPT) updated the group on
the current consultation on the Strathclyde Regional Bus Strategy and encouraged
participation from members. 
Sheelagh O’Reilly, Cove and Kilcreggan Community Council, encouraged members
to read the documentation relating to Argyll and Bute Council’s proposed
amendments to the Scheme for the Establishment of Community Councils, in
particular the proposals contained in Appendix 5 relating to Existing (and Proposed)
Administration Grant Levels. 
The group considered an update from Helensburgh Community Hub which
highlighted the work of the Hub and their next 5-year plan, June Pride Month
activities, Volunteer Week celebration lunch, the upcoming Hub AGM as well as
information about the successful Helensburgh Book Festival. 
A presentation from Jayne Burnett, Visiting Friends, outlined the benefits of social
connections on physical and mental health, factors shaping social connection
through the Social Ecological Model, the benefits of 1:1 befriending over groups, the
impact of Covid, the misconception that loneliness is an ‘old people’ issue, and future
planning for the service. 
Consideration was given to a report updating the group on the activity of the
Community Wealth Building Short-Term Working Group, which was established at
the August 2024 meeting of the Helensburgh and Lomond Area Community Planning
Group. The report highlighted the STWG activity from February to May which
included learning from other parts of Argyll and Bute and learning about Community
Benefits. 
7.0 Mid Argyll, Kintyre and the Islands (Meeting Papers - LINK)
The group gave consideration to a report from Jeni West highlighting work on local
Land Management Plans, combatting phytophthora ramorum disease in larch trees,
progress with peatland restoration, and details of upcoming complex operations. 
Jeni advised that Balfour Beattie, who are carrying out construction works on the Fire
Tower Trail at Achnabreac, were going through the formal planning process to
completely close the site for 12 months. 
Francesco Bertoldi delivered a presentation on the development and renewal of the
Scottish Government’s National Islands Plan.  Group members noted that the new
plan contains fewer strategic objectives and commitments with a greater focus on
Page 22

Page 23

Classification: OFFICIAL
allocation of responsibiities and the provision of a dedicated resource and capital
budget. 
The group considered the annual update from Argyll Community Housing
Association (ACHA) which included information on housing stock in Mid Argyll,
Kintyre and on Islay, work undertaken with communities; sheltered housing,
allocation and reletting of properties, customer involvement strategy, improvements
to the Duncholgan travelling persons site, and an update on their plans and
performance benchmarking. 
Becky Hothersall, Poverty Alliance, updated the group on work with Argyll and Bute
Council and TSI on the Taking Action on Rural Poverty project (TARP) which hosted
a quarterly anti-poverty meet up for groups where the cost of living is an issue.  It
was noted that the next meeting would focus on applying a human rights lens to
combat poverty in communities, focusing on transport and food.
Becky advised that the Poverty Alliance also coordinates a citizens panel to create
opportunities for people with lived experience of living on a low income or having
high costs due to their rural location, noting that the panel members were keen to
contribute to a broad range of work, particularly on the topics of food costs and
community resilience to extreme weather. 
Consideration was given to a verbal update from Sheila Campbell, Tarbert Castle
Volunteers, which highlighted the history of the castle and work done which has
gradually made the area safe for people to enjoy, including the introduction of sheep
to keep the grass down, the installation of benches, information points, a viewing
platform and picnic tables, and the opening of an orchard. 
Jane Cowan, Tarbert After School Care, provided a verbal update on the service
which is the only childcare provision in Tarbert, has been running since 2009 and
which provides care to 16 children every day during term time. Jane highlighted the
benefits of providing after-school care and highlighted that they would be looking at a
funding bid to maintain or increase the number of free places. 
The group gave consideration to an update from Susan Paterson, Shopper-Aide,
providing information on the results of a recent survey on the services for older
people in Kintyre. The survey had asked a number of questions and it was noted that
the most contentious issue was transport, with responses highlighting the need for
better transport and access to appointments, more social groups for different groups
of people who do have difficulty getting out, and more ways of finding out about what
is going on in the area. 
An update from Campbeltown Community Council highlighted participation in the
recent Campbeltown Airport Users and Community Engagement Forum, concerns in
relation to the reduction in bed numbers and the ongoing staff shortages at
Campbeltown Hospital, delight at the opening of a second pharmacy in
Campbeltown, and the planned VE celebrations in May 2025. 
Muriel MacKaveney, Culture, Heritage and Arts Assembly (CHARTS), provided a
verbal update on the Creative Minds project partnering with Campbeltown Link Club,
Page 23

Page 24

Classification: OFFICIAL
the Heritage Awards Scheme, the re-opening of Campbeltown Museum, and a
forthcoming Gaelic Landscape event. 
Philip Moorcroft delivered a presentation on Kintyre Coastal Network, a community-
led marine restoration group based in Kintyre and established in 2024.  The
presentation provided information on the group, its partnership work, its aims and
current projects including a marine litter survey, seagrass regeneration and marine
education. 
The group considered a report from Transport Scotland which highlighted
The current ongoing works at the Rest and Be Thankful for the erection and repair of
the hillside debris netting, planned footway works at Millknowe Road and Kilchenzie,
the Campbeltown Active Travel Scheme, and further drainage improvement
schemes on the A83.  In response to a number of questions from group members,
Ian Woodcock, Transport Scotland, agreed to provide further information. 
8.0 Oban, Lorn and the Isles (Meeting Papers - LINK)
Megan McWilliam delivered a presentation on the development and renewal of the
Scottish Government’s National Islands Plan.  Group members noted that the new
plan contains fewer strategic objectives and commitments with a greater focus on
allocation of responsibiities and the provision of a dedicated resource and capital
budget. 
Becky Hothersall, Poverty Alliance, updated the group on work with Argyll and Bute
Council and TSI on the Taking Action on Rural Poverty project (TARP) which hosted
a quarterly anti-poverty meet up for groups where the cost of living is an issue.  It
was noted that the next meeting would focus on applying a human rights lens to
combat poverty in communities, focusing on transport and food.
Becky advised that the Poverty Alliance also coordinates a citizens panel to create
opportunities for people with lived experience of living on a low income or having
high costs due to their rural location, noting that the panel members were keen to
contribute to a broad range of work, particularly on the topics of food costs and
community resilience to extreme weather. 
Jacqueline Westerman, Home Energy Efficiency Project Officer, delivered an update
on the white meter removal process, highlighting that the replacement of white
meters with smart meters has proved to be a slow process especially in rural areas.
Jacqueline said that the message for householders is to contact their energy supplier
as soon as possible as losing the Radio Teleswitch service without having a smart
meter will result in a higher tariff being applied. 
Consideration was given to an update on the new Oban, Lorn and the Isles Health
and Wellbeing Network which started on 1st April 2025.  The update included
information on how to become a member, highlighted a public event which will take
place at the end of the summer to focus on the aspirations of the network, with the
group also noting that Carol Flett’s role within the network will change slightly. 
Page 24

Page 25

Classification: OFFICIAL
Catriona Petit, Hope Kitchen, advised of a new steering group which is looking for
members and has been established to start a Development Trust in Oban, and
highlighted a new recovery group starting in Oban for peer to peer support on alcohol
and drug problems. 
OLI ACPG Chair, Colin Buchanan, provided an update on the Climate Change
Resilience Short-Life Working Group, confirming that he had written to all
Community Councils within the locality with two responses having been received.
Colin further advised that local Community Council’s resilience plans require to be
updated and that he would welcome contact from anyone that would like to be
involved in the work of the short-life working group, particularly Community Council
representatives. 
Kirsty MacKenzie, Carers Act Officer, delivered a presentation on the Carers
Scotland Act 2016, providing the group with information on the National Carer
Strategy, which sets out the commitment to support and involve carers as an equal
partner, and the Council’s statutory responsibilities to unpaid carers. 
The group noted the information provided in a presentation delivered by Joan Best,
Crossroads, including the services provided by Crossroads within the Oban, Lorn
and the Isles area. Joan highlighted the support given to unpaid carers with
particular reference to respite support and advised that support provided for the
cared-for can include taking them out for a drive, lunch or a walk, or various activities
if they cannot leave the house. 
9.0 Further Actions
It is requested that the Management Committee note the report and the successful
meetings held in May 2025.
10.0     Implications
Strategic Implications Meetings of the Area Community Planning Groups held
in May included discussion on the Argyll and Bute
Outcomes Improvement Plan priority of transport
infrastructure.
Consultations No prior circulation of this report. 
Resources  No direct resource implications however consideration
of the issues raised and following courses of action
may have a knock on effect on finance and/or staff
resource
Prevention Contributes to the prevention agenda 
Equalities Contributes toward reducing inequalities 
Page 25

Page 26

Classification: OFFICIAL
For More Information:
John McLuckie, Partnerships Lead, john.mcluckie@argyll-bute.gov.uk 
Page 26

Page 27

Page 1 of 8 
Date: 27 May 2025 
Update on Argyll and Bute Climate Action: a Climate Change
Strategy and Action Plan for Argyll and Bute. 
1.0 Purpose 
The purpose of this report is to provide an update on the Community Planning
Partnership’s Argyll And Bute Climate Action project: developing a Climate Change
Strategy and Action Plan for Argyll and Bute, and in particular on two points: 
• Budget Considerations: To ask the CPP Management Committee to consider
the potential for use of remaining project budget to undertake further risk
assessment and associated work around resilience along with working up
legacy proposals beyond the end of the current funded period (end of October
2025).
• Legacy Proposal: to ask the CPP Management Committee to consider and
comment on an outline proposal for an expression of interest in anticipation of
a successor to the National Lottery Climate Action Fund or similar fund
coming on stream. This to include what future financial contribution CPP
partners might make. 
2.0 Recommendations 
The CPP Management Committee is asked to
• Budget Considerations: Approve the proposal from the project Steering
Group to use remaining budget, projected at £32k at the end of the current
funded period, to keep the project manager in post to undertake further risk
assessment and associated work around resilience along with working up
legacy proposals, for three days per week from the end of October 2025 to
late July 2026
• Legacy Proposal: Consider and comment on the appended outline proposal
for an expression of interest in anticipation of Scottish Government and/or a
successor to the National Lottery Climate Action Fund or similar fund coming
on stream, with emphasis on actions that cut across CPP partners’ areas of
interest. 
Page 27 Agenda Item 4

Page 28

Page 2 of 8 
3.0 Background 
3.1 Budget Considerations 
At its meeting of 16 April, the CPP Management Committee approved the climate
change strategy and accompanying outline action plan, and also agreed that of the 6
approved Priority Areas for Action that resilience, particularly community resilience,
should be foremost. The CPP agreed that the focus of the project for the remainder
of the funded period, which is to the end of October 2025, should be on to producing
the Action Plan. The CPP also noted feedback that the initial proposal to commission
a consultant-led climate change risk assessment for the scale of Argyll and Bute 
would be likely to require greater resources than within the budget and that working
with communities, ideally via community councils, to produce a range of community-
leg risk assessments in support of community resilience plans would best fit the
brief.
The Management Committee asked the Steering Group to review options available,
which were to use the £32k projected to be available at the end of the funded period
to enable employment costs, travel & subsistence, equipment and events:
4 days per week: to mid May 2026
3 days per week: to mid July 2026 
2 days per week: to late Nov 2026 
The Steering Group agreed 3 days per week as the preferred model, comprising   21
hours per week x 37 weeks to 17th July 2026.
The Community Planning Manager and the Steering Group Chair agreed that this
would all be for additional work over and above the deliverables specified in the
original funding agreement and that ACT as the employing body could carry forward
funds beyond the end of the current financial year to enable this.
The additional work to comprise:
• Ongoing work with communities to develop community level risk assessments
in support of community-led resilience planning, including budget for 8
learning exchange/summit type events.
• Monitoring and reporting on the first year of progress, with input on evaluation.
• Developing legacy proposals.
The Management Committee is asked to approve the Steering Group’s
recommendation to use the remaining project funds for Argyll Countryside
Page 28

Page 29

Page 3 of 8 
Trust to keep the project manager in post for 3 days per week from the end of
October 2025 to mid July 2026.
3.2 Legacy Proposal
The Management Committee also asked on 16 April for the Steering Group to could
develop an outline legacy proposal, for example to lead on those areas of joint
actions and monitoring and reporting, and suggested that this could be via beginning
to work up text in anticipation of a successor to the National Lottry Climate Action
Fund coming on stream: the current Fund closes at end May 2025 and Lottery staff
when contacted suggested that while any successor fund might not be exactly the
same, sustainability would be likely to feature prominently in this.
The Climate Action Fund was suggested on the basis that it provides multi year
funding to partnerships and specifically aims to target groups what might not
otherwise engage with the climate change agenda, and to target activity that does
not fall with the scope of public bodies’ existing defined requirements.
There are no guarantees of Scottish Government funding for climate change action
beyond existing funds targeted at specific requirements, but given the climate
strategy’s close linkage to the Scottish National Adaptation Plan it is hoped that
funding in support of partnership or community initiatives might become available.
The outline proposal appended is drawn from the three questions posed in the first
phase application stage (expression of interest) for the Climate Action Fund as at
May 2025:. 
• What’s your proposed project idea?
• How will you work with others to deliver your project?
• How does your project help communities to take climate action?
Outline text proposed to date relates to the strength of partnership working
evidenced by the CPP climate strategy along with illustrations of need based on
Argyll and Bute’s particular geography and economy. There is less so far on the
proposed project ideas as the action plan for the strategy is still in fairly early stages
of development, although some suggested areas for emphasis are
• resilience as the area that the Management Committee based on feedback
from the broader CPP has identified as the foremost area for emphasis
o including capacity building as many community groups are already
operating at capacity
• skills, procurement and supply chain due to the CPP’s work on community
wealth building and links with developing a more circular economy in Argyll
and Bute
Page 29

Page 30

Page 4 of 8 
o including joint procurement opportunities for key items of equipment
and supplies identified through the community risk assessment
processes.
The Management Committee is asked to note the proposal outline and
Committee members are asked to provide the Project Manager with any
suggestions for priority actions, not tied to any single organisation, that they
would like to see included. 
4.0 Detail 
The proposal outline text for a potential expression of interest is appended at the end
of this report. 
5.0 Resource Implications
The Management Committee asked for an indication of what future financial
contribution CPP partners might make. Based on the Climate Action Fund outline,
funding is available typically for three to five years and five years is suggested in
order to provide a substantial block of time to embed change. The suggestion for
CPP resourcing would be to fund a post at a similar level to the Climate Change
Project Manger but with the person specification shaped by the requirements of
taking forward agreed actions. 
Andy Macpherson, Climate Change Project Manager 
For more information, please contact: Andy Macpherson andy@act-now.org.uk 
Page 30

Page 31

Page 5 of 8 
Outline text for Expression of Interest – National Lottery Climate Action Fund 
What we’ll ask for in your application
What’s your proposed project idea?
You should tell us:
• about your project
• how your project meets our priorities
• an idea of how you will allocate the money to deliver your project
• what you’re hoping to change – in the short and long term
• how you know it’s needed
• how the community has been involved in shaping your idea
• why is this the right time for your project
• about the things that will increase the chance of your project being successful for example,
you have support from your Local Authority or there’s increasing support from your
community.
You can write up to 1,000 words for this section, but do not worry if you use fewer.
Argyll and Bute Climate Action is an initiative of the Argyll and Bute Community Planning Partnership
to develop a climate change strategy and action plan relevant and appropriate to the unique
geography and economy of the region. This is seen as a long term initiative, and emphasis at this
stage has been on identifying priority areas of action that are most within the Community Planning
Partnership’s ability to influence or control as the group of organisations and community
representatives working together to achieve improvements across Argyll and Bute in ways which
promote prevention, reduce inequalities and build community capacity. Because many of the CPP
partners are public sector bodies that already have climate mitigation duties, emphasis at this stage
has been on supporting communities to adapt to the impacts of climate change, ensuring that our
most vulnerable communities and households in particular are  taken into account. The vision of the
strategy is that “We make Argyll and Bute climate ready by acting together to understand and adapt
to our changing climate”. A project manager has been in post with funding from November 2023 to
October 2025, employed by Argyll Countryside Trust,  to develop the strategy and action plan, and
the intention of this application is to identify and seek support at the end of this funded
development phase to take forward key projects identified which sit across the remits of the various
partnership members. The CPP partners are currently reviewing options to extend the funded
period.
The CPP Management Committee agreed six priority areas for action following a review of all the
partners’ climate change duty reports and climate change plans, and a  programme of stakeholder
and community engagement. This latter was further supported by close collaboration with the Argyll
and Bute Climate Action Network (ABCAN) Climate Hubs supported by the Scottish Government,
operating across the four administrative areas across Argyll and Bute.
The priority areas are
Policy Influence
Page 31

Page 32

Page 6 of 8 
Infrastructure, including natural infrastructure
Skills, Procurement and Supply Chain
Resilience/Carbon Literacy
Risk Assessment
Crosscutting 
Following feedback from community councils, the Area Community Planning Group, ABCAN and
partner bodies, resilience has been placed foremost among these. 
How will you work with others to deliver your project?
You should tell us:
• about your organisation
• what experience or learning has led you to apply
• about the communities, organisations or groups you’re currently working with (or those you
hope to work with)
• why your partnership is best placed to deliver this work
• what will the partners do in your project?
• how you will share learning among your partners and with other groups, projects and
communities.
You can write up to 1,000 words for this section, but do not worry if you use fewer.
The Community Planning Partnership as noted above is the group of organisations and community
representatives working together to achieve improvements across Argyll and Bute in ways which
promote prevention, reduce inequalities and build community capacity. Key among these in funding
and leading on the development stage of Argyll and Bute Action have been Argyll and Bute Council,
NHS Highland, Nature Scot and Argyll and Bute Third Sector Interface, with strong partnership
working with other CPP partners including but not limited to Highlands and Island Enterprise and
Scottish Enterprise, Police Scotland, Scottish Fire and Rescue Service, University of the Highlands and
Islands, including the Scottish Association for Marine Science, National Farmers’ Union for Scotland,
and the Poverty Alliance in addition to technical support from Adaptation Scotland/Verture
(formerly Sniffer) and the Sustainable Scotland Network. This partnership brings together skills,
resources and influence across an extremely broad cross section, hence the importance of
identifying a core set of priority actions of common interest to all partners, and the governance and
partnership working have been recognised as a major strength in a CPP self assessment exercise led
by the Improvement Service. 
The CPP also constitutes a strong network for engagement across the community. Through its
structure and project governance in the development stage, the CPP in addition to representing the
bodies listed above and their respective networks, the CPP also comprises a Climate Change Working
Group and a Community Wealthbuilding Working Group and four Area Planning Groups which in
turn link with 53 Community Council areas. Overlapping but distinct is the Argyll & Bute Local
Resilience Partnership.
Page 32

Page 33

Page 7 of 8 
The experience of funding and supporting the project manager’s work to develop a climate change
strategy across the CPP has also served as a study in collaborative working across the various
partners’ briefs in pursuit of shared ambitions. A recent self assessment led by The Improvement
Service saw the strategy – both the strategy document and the process through which it was
developed – cited as an exemplar of effective partnership working and innovative approaches, and
the CPP now wish to build upon this, including an assessment of the financial resources it needs to
contribute to further work as well as seeking external funding. 
Turning to the communities with which we are currently working and hoping to work, in short this
means the population of Argyll and Bute as a whole, emphasising our more vulnerable communities.
Argyll and Bute is the second largest local authority in terms of land mass in Scotland and has a
population of just under 90,000 making it one of the sparsest in Scotland with around 50% of our
communities being defined as ‘rural’. This rural and dispersed characteristic is coupled with the
majority of the population living in coastal towns or our 23 inhabited islands and relying on transport
links that largely follow shorelines or historic port and ferry routes. With 80% of the population living
within 1km of the coast, rising sea levels and exposure from more extreme weather events is more
relevant to our region than many others. We have an ageing population and overall population
trends over 2018-2043 are minus 14.8% in contrast to the plus 2.5% population increase projected
for Scotland over the period. The region’s characterising features of high geographical diversity, low
population density, 
long coastlines, largely rural small, isolated and ageing communities and long distances all 
impact on considerations of what “good” climate action means for Argyll and Bute. However, 
we also have urban considerations with our largest single centre of population being 
Helensburgh, and other important settlements with urban issues but rural supply chains and 
correspondingly long and vulnerable transport and other communications links. Average gross
weekly pay for full-time workers living in Argyll and Bute is £653, or 7% lower than the Scotland
average of £702 (NOMIS 2024) and 28% of the population lack access to a car. 
How does your project help communities to take climate action?
You should tell us:
how your project will positively impact communities – in the short and long term
• how your project inspires people to take climate action
• how you will address barriers to participation for underrepresented people and communities
– for example, those experiencing ethnic or racial inequity, discrimination or inequality,
disabled people, LGBTQ+ people, and people who are seeking asylum or who are refugees.
You can write up to 1,000 words for this section, but do not worry if you use fewer.
The climate change strategy spans measures to impact communities in the short term through
means such as supporting climate risk assessments as part of the development of community
resilience plans, right through to longer term measures including input to Local Place Plans to help
shape the Local Development Plan and engagement with utilities and policy makers on long term
Page 33

Page 34

Page 8 of 8 
infrastructure development. The elements of the strategy that this funding proposal seeks to take
forward are those that could be termed mid term innovative pilot or demonstration projects that
can be developed and initiated over a three to five year period to help shape longer term action
suitable to Argyll and Bute’s specific geography and economy.  
A key aspiration during the development phase has been to go beyond engagement with groups
already actively engaged with the climate change agenda. Working with groups such the Health and
Social Care Partnership and its associated Living Well network, the Poverty Alliance, the Local
Resilience Partnership and InspirAlba on its household resilience project have helped to reach more
disadvantaged groups, in addition  to reaching out to the Gaelic speaking community which is largely
in isolated and fragmented locations. Argyll and Bute has a low population density with numerous
small, isolated and fragmented communities, connected by vulnerable transport and
communications links and experiencing high rates of digital exclusion as well as fuel and transport
poverty. A key approach to inspire people is through the language of resilience: the region comprises
53 Community Council wards, most of which do not have up to date resilience plans and some of
which do not have functional community councils. Following Storm Eowyn as a recent example,
some areas were without telecommunications, electricity and water for five days, and many were
physically inaccessible to emergency or other services due to the number of fallen trees blocking
roads or damage to ferry infrastructure. This necessitates understanding local resilience needs and
identifying the means to procure these, including skills development and capacity building.
Taking an approach through resilience also ensures engagement in a political and economic context
climate where net zero and carbon reduction can be portrayed or perceived as imposing extra costs
on groups who are already experiencing difficulties with cost of living.
Taking the 6 priority areas for action that the CPP strategy has embraced:
Policy Influence: Influencing national and regional public and non-public policies through the CPP’s
collective voice in a way that recognises Argyll & Bute's distinctive geography and population
Infrastructure, including natural infrastructure: Addressing demand and impacts of better transport
infrastructure to reduce reliance on private cars and provide for those who do not have a car;
enhancing communications and grid infrastructure through maximising decarbonisation and
renewable energy opportunities; and natural capital: managing our green and blue infrastructure to 
reduce emissions and support resilience
Skills, Procurement and Supply Chain: Promoting opportunities for climate mitigation, adaptation
and community wealth building through improving circular economies within Argyll & Bute; and
Increasing opportunities for individuals to gain the skills required to deliver climate mitigation,
adaptation and resilience in an inclusive and just way.
Resilience/Carbon Literacy: Promoting carbon literacy and greater resilience, across all CPP sectors
to empower individuals to bring about climate mitigation, adaptation and resilience in an inclusive
and just way.
Risk Assessment: Deepening our understanding of the risks and opportunities, including economic
risks and opportunities, presented by climate change to Argyll and Bute as a whole and to specific
communities and sectors
Crosscutting: Encourage individuals, communities and agencies to take multiple actions and to
identify new risks and opportunities
Page 34

Page 35

Classification: OFFICIAL   
Community Wealth Building - priority recommendations and
next steps 
1.0 Purpose 
The purpose of this paper is to provide the CPP Management Committee with key
priorities from the CLES CWB report that the CWB steering group has identified as
areas to work on first.  Three meetings took place from January to April 2025.  All the
recommendations in the CLES CWB paper have been allocated a priority ranking on a
scale 1-3 and categorised as easy, medium or hard to deliver.  Procurement
(spending pillar) has been identified as a top priority. 
2.0 Recommendations 
The CPP Management Committee is asked to note and agree the CWB Steering
Group’s recommendations:
• Note and agree the proposed priorities for action at section 3.2.3 and appendix
1 and to comment and amend as necessary before identifying next steps such
as developing a CWB action plan like Clackmannanshire1; 
• Comment on a CWB CPP members’ charter for Argyll and Bute (appendix 2)
like the one used by Stirling Council’s Procurement Department 2 and North
Ayrshire’s CPP charter 3;
• note the recommended action on Employee-Owned Businesses at section 5;
• Note the Bill submission to the Holyrood Economy and Fair Work Committee
presented at CPP in April 2025; 
• consider any further actions required to develop the Argyll and Bute CPP
approach to Community Wealth Building ahead of the implementation of
legislation over the coming year. 
3.0 Background and context 
3.1 The five pillars of CWB
The five principles of Community Wealth Building have been developed by the
Centre for Local Economic Strategies4 over a number of decades through work with
anchor institutions across the UK and the World. These are:- 
1 https://www.clacks.gov.uk/document/6940.pdf 
2 https://home.scotland-excel.org.uk/media/kp2hzmvb/3-procurement-community-wealth-building-charter-
template-docx.pdf 
3 https://www.north-ayrshire.gov.uk/Document-library/cwb-anchor-charter.pdf 
4 https://cles.org.uk/what-is-community-wealth-building/the-principles-of-community-wealth-building/ 
CWB Steering Group Paper
to CPP 
Date: 6th June 2025
Page 35 Agenda Item 5

Page 36

Classification: OFFICIAL
• Plural ownership of the economy.  
• Making financial power work for local places.  
• Fair employment and just labour markets.  
• Progressive procurement of goods and services.  
• Socially productive use of land and property.   
Anchor institutions are identified as statutory and third sector bodies which can
influence ‘economic engines’: The term is used to refer to organisations which: 
• Have an important presence in a place, usually through a combination of:
being largescale employers, the largest purchasers of goods and services in
the locality, controlling large areas of land and/or having relatively fixed
assets.
• Are tied to a particular place by their mission, histories, physical assets and
local relationships. Examples include local authorities, NHS trusts,
universities, trade unions, large local businesses, the combined activities of
the community and voluntary sector and housing associations. 
The Scottish Government has published an overview of the responses received to
their January 2023 consultation paper on Community Wealth Building legislation5. 
3.2 Detailed Summary of the Argyll and Bute Report on Community Wealth
Building
3.2.1 Introduction
The Argyll and Bute Community Wealth Building (CWB) report, commissioned by the
CPP, prepared by the Centre for Local Economic Strategies (CLES) and published in
April 20246 sets out a transformative approach to local economic development. It
identifies systemic challenges such as depopulation, housing shortages, and land
value extraction, arguing that traditional economic models have failed to address these
issues adequately. The report asserts that "community wealth building should be
intrinsic to the economic strategy of Argyll and Bute" and cannot be treated as an add-
on but must be fully embedded in local policy.” 
3.2.2 Economic and Social Context
Argyll and Bute faces acute economic challenges, including:
• Depopulation: The region has been experiencing a steady decline in
population, particularly among young people, leading to a shrinking workforce.
• Housing Crisis: High property prices, a shortage of affordable housing, and
the prevalence of second homes make it difficult for local workers to live in the
area.
• Extractive Economic Model: Many local assets and industries, including
energy and tourism, generate wealth that is extracted from the region rather
than reinvested locally. 
5 https://consult.gov.scot/economic-development/community-wealth-building-consultation/ 
6 https://www.argyll-
bute.gov.uk/moderngov/documents/s206441/Appendix%201%20Argyll%20and%20Bute%20Report%20F
inal.pdf 
Page 36

Page 37

Classification: OFFICIAL
The report states:
"Market forces are negatively shaping the local economy, impacting citizens'
wellbeing and quality of life. To address these deep-rooted challenges, there
needs to be a step change towards an approach which has community wealth
building firmly rooted at its core." 
3.2.3 Recommendations using the Five Pillars of Community Wealth Building 
The report outlined five pillars through which CWB can be implemented and made 23
recommendations.  The CWB steering group considered the first three sets of
recommendations relating to pillars 1—3 in detail and will continue working on pillars
4 and 5.  The details and commentary are set out in appendix 1 but the table below
summarises those recommendations for priority action:- 
4.0 Connections Between the Argyll and Bute CWB Report and the Economic
Strategy 2024-2034 
The Argyll and Bute Economic Strategy 2024-2034 explicitly aligns with Community
Wealth Building (CWB) as a central principle in shaping the region’s economic future. 
The strategy states: 
"The issues identified above will be achieved through the core focus of Argyll and Bute
being a wellbeing economy through embedding a Community Wealth Building
approach." 
The economic strategy and the CWB framework share a mutual focus on localising
Page 37

Page 38

Classification: OFFICIAL
wealth, improving resilience, and ensuring that economic activities directly benefit the
communities of Argyll and Bute. Below are the key areas where these two strategies
intersect: 
4.1 Economic Strategy Vision and Community Wealth Building 
The economic strategy defines its purpose as: 
"A place-based and business/person-centred approach, to secure a fair, inclusive, and
prosperous future for the area, more resilient to external factors including the rapid
advances in digital technology and increasing impacts of climate change." 
This aligns with the CWB approach, which aims to:
"Change the way that our economies function by increasing the flow of wealth and
opportunity for the benefit of people who live and work in the area." 
Both frameworks prioritise economic resilience, fair work, and localised
investment to counteract external economic pressures such as depopulation and land
value extraction. 
4.2 Key Economic Pillars and the Five Pillars of CWB 
The Economic Strategy is structured around four strategic key pillars, which closely
align with the five pillars of CWB. 
Economic Strategy Pillars Corresponding CWB Pillars
People: Addressing workforce
shortages and skills gaps.
Workforce: Developing fair and just labour markets,
promoting Living Wage commitments, and improving
career pathways.
Place: Investing in towns,
housing, and transport
infrastructure.
Land and Property: Socially productive use of land,
community-led regeneration projects, and affordable
workspaces.
Planet: Achieving Net Zero,
supporting renewable energy.
Finance & Inclusive Ownership: Supporting local
investment into green energy and cooperative
business models.
Prosperity: Increasing incomes
and growing the economy
sustainably.
Spending: Progressive procurement practices that
strengthen the local economy. 
4.3 Economic Strategy and Local Investment in Renewable Energy 
The Economic Strategy emphasises capitalizing on Net Zero opportunities, with a
focus on renewable energy investments: 
"Delivering net zero and improving our biodiversity by supporting the sustainable
growth of clean energy production (i.e. hydro, solar, wind and biomass), woodland,
Page 38

Page 39

Classification: OFFICIAL
peat and marine habitat restoration, encouraging green industries to develop in our
area, nature-based solutions and community ownership." 
The CWB report also prioritises local control over renewable energy infrastructure: 
"Lots of reserves are sitting in third-sector current accounts. We need to move from
community benefit to ownership of assets like turbines." 
Aligning these strategies will ensure that wealth generated from renewable energy
projects remains in local communities, rather than being extracted by external
investors. 
"Change the way that our economies function by increasing the flow of wealth and
opportunity for the benefit of people who live and work in the area." 
Both frameworks prioritise economic resilience, fair work, and localised
investment to counteract external economic pressures such as depopulation and land
value extraction. 
4.4 Procurement and Local Business Growth 
The CWB approach to procurement is mirrored in the Economic Strategy's vision for
business growth: 
"Business growth: many of the area’s micro to small and medium-sized businesses
have potential to grow, supported by appropriate business support, infrastructure and
land for business development." 
The CWB report advocates for: 
"Establishing a CPP procurement working group to coordinate public spending and
publishing a procurement pipeline to ensure transparency and accessibility for local
businesses." 
Both strategies recognize that promoting public sector procurement within Argyll
and Bute is essential for business development, job creation, and economic
resilience.   
4.5 Addressing Depopulation Through Fair Work and Housing 
The Economic Strategy highlights that: 
"The population of Argyll and Bute has decreased by 2.4% since 2011 and from 2018 to
2028 it is projected it will fall a further 5.9%." 
To counteract this, it recommends: 
• Investment in skills development to attract and retain workers.
• Increased wages through Fair Work principles.
Page 39

Page 40

Classification: OFFICIAL
The CWB report reinforces this by advocating: 
"Developing a Living Wage policy for all anchor institutions and creating an Argyll and
Bute Employment Charter to encourage fair employment practices." 
A key issue tied to depopulation is the housing crisis, which both reports identify as a
critical barrier: 
"Argyll and Bute faces a housing emergency, depopulation challenges, and continued
issues around land and value extraction." 
By integrating CWB principles into the Economic Strategy’s housing and
employment priorities, Argyll and Bute can work towards reversing depopulation and
ensuring long-term community sustainability. 
"Business growth: many of the area’s micro to small and medium-sized businesses
have potential to grow, supported by appropriate business support, infrastructure and
land for business development." 
The CWB report advocates for: 
"Establishing a CPP procurement working group to coordinate public spending and
publishing a procurement pipeline to ensure transparency and accessibility for local
businesses." 
Both strategies recognize that keeping public sector procurement within Argyll and
Bute is essential for business development, job creation, and economic
resilience. 
4.6 Conclusion: Aligning CWB and the Economic Strategy for Maximum Impact 
The Argyll and Bute Economic Strategy 2024-2034 presents a significant opportunity to
embed CWB principles into mainstream economic policy. The strategy itself states: 
"Community Wealth Building and empowerment: there is a requirement to start to
embed Community Wealth Building as the key mechanism to deliver a wellbeing
economy, economic development, growth and prosperity across all communities." 
Moving forward, the integration of CWB principles into economic development will
require:
1. A coordinated regional approach, ensuring that all public institutions adopt
progressive procurement, fair work, and land-use policies.
2. Embedding CWB within investment strategies, particularly in renewable energy
and infrastructure.
3. Enhancing community control over local assets, ensuring wealth is retained and
reinvested in Argyll and Bute. 
In conclusion the CWB Bill requires the publication of a three CWB action plan and
annual review and this could be integrated with the Economic Strategy review process. 
Page 40

Page 41

Classification: OFFICIAL
5.0 Employee-Owned Businesses (EOBs) in Argyll & Bute
(Author: Tom Warren, Board member of Industry Leadership Group, Scotland for
Employee Ownership (SfEO), EO adviser and Independent Trustee based in Dunoon.) 
Vision - Grow and develop the number of employee-owned businesses in the Argyll
and Bute economy 
Objectives 
• Promote employee ownership in Argyll and Bute. 
• Support a model of business that disrupts wealth extraction, develops a healthier
private sector and builds an economy for the future. 
• Support local employment staying within a community of place.
• Support local businesses to progress a Fair Work agenda. 
About Employee Ownership 
An employee-owned business is one where the employees, rather than external
shareholders, hold the majority of the shares – this can be done directly or through an
Employee Ownership Trust which will buy the shares on behalf of the employees. There
is not one prescribed employee ownership model, and the structure can be shaped to fit
the company. 
Background
As part of the National Strategy for Economic Transformation (NSET), the Scottish
Government has set an ambitious target of 500 employee-owned businesses in
Scotland by 2030. Scotland for Employee Ownership (SfEO) supports this target,
working in partnership with the EOA (Employee Ownership Association) and Scottish
Enterprise’s CDS (Cooperative Development Scotland). 
In the CWB paper (Model of Opportunity 1: Building greater employee ownership in
Argyll and Bute) Argyll and Bute is noted as ‘a fertile ground for leading the rest of
Scotland in this due to a combination of a number of factors including, a high proportion
of SMEs, an ageing population and with it business owners getting closer to retirement
age and communities that want to play an active role and have a stake in the local
economy.’ 
However, to date there are only 2 companies in Argyll and Bute who are EOBs. 
1.  John Brown (Strone), Contractors Dunoon. EOT established in 2020. 
2.  Helensburgh Toyota, Car Dealership Helensburgh. EOT established in 2023. 
This compares to 217 EOBs head quartered across Scotland at the close of 2024.
For comparisons, Employee-Owned Businesses in the Highland region total 17, with
Shetland having 4 companies. Much of this growth in other regions is because of the
strength of the small network of EO advisers and businesses professional services such
as accountants and solicitors being aware of an EOT being a viable succession model
for retiring company owners.
Page 41

Page 42

Classification: OFFICIAL 
It is recommended that more work is required to spread the news to businesses
for the support for new EOTs that is available from CDS and their private sector
EO adviser network in Scotland.
Case Study: Helensburgh Toyota
https://www.ownershipassociates.co.uk/news/helensburgh-toyota-dealership-sold-to-
employees 
The independent dealer that has held the Toyota franchise for over 45 years is
recognised as one of the franchise’s top performers for customer care in the UK,
regularly appearing in the Top 5 ranking of dealers, as well as winning two European
Ichiban awards for customer service too.
The business was jointly owned by Gary Mulvaney and Ernie Cowan and they
remained in their current roles until March 2024 as part of the handover process of the
£16 million turnover business – located at two sites in Helensburgh – to the newly-
formed Helensburgh Automotive Employee Trust operation. The company recently
completed a £500,000 refurbishment of its service workshop as it continues to invest in
the future. 
The business’s new leadership team comprised an experienced team with Centre
Principal Tim Roome, General Sales Manager Kirsteen McGuire, Used Vehicle
Manager Gavin Wilson, Finance Manager Jane Victor, Service Manager Scott Brown
and Parts Manager Euan McIntosh.  
Managing Director Gary Mulvaney who joined the company in 1997 said: “It’s a very
exciting time for the company with lots of opportunities ahead. Toyota has been a global
leader in hybrid technology for over a quarter of century and is developing a range of
electric and hydrogen vehicles to give our customers a genuine choice for the future.
We are proud to continue to represent this trusted brand. 
“People have always been at the heart of what we do, whether that is staff, customers
or the community”
“This felt like a natural transition as the business will remain in the hands of those local
staff who have made it what it is. Our customers value the service, the personal
attention and the familiar trusted face when they walk in and that will remain.”
Director Ernie Cowan who joined in January 1978 said: “It’s been an honour to help this
business grow and thrive, but the time is right for the next generation to take things
forward.”  
Helensburgh Toyota is believed to be the first Scottish car dealership to make the move
to implement an Employee Ownership Trust. The transaction was supported by
employee ownership specialists Ownership Associates with legal advice provided by
Bellwether Green.
Takki Sulaiman 3rd June 2025 v3 on behalf of the CPP CWB steering group 
For more information, please contact:
Takki Sulaiman, Chief Executive, Argyll and Bute Third
Sector Interface
takkisulaiman@argylltsi.org.uk 
Page 42

Page 43

Classification: OFFICIAL
Links
CWB legislation consultation response updated 26th October 2023 –
https://consult.gov.scot/economic-development/community-wealth-building-consultation/ 
Poverty Alliance citizen’s panel on CWB October 2023 -
https://www.povertyalliance.org/get-heard-scotland-community-wealth-building/ 
EDAS guide to CWB January 2023 - https://edas.org.uk/community-wealth-building-guide/ 
CLES November 2022 publication on interviews with UK local authorities re: CWB   and five
areas for action:-  
https://cles.org.uk/publications/a-light-in-the-dark/ 
NEW North Ayrshire Community Planning partnership, 2024-2027 CWB Plan
https://www.north-ayrshire.gov.uk/Document-library/cwb-strategy.pdf 
The role of the NHS as an anchor institution – The Health Foundation 
https://www.health.org.uk/publications/reports/building-healthier-communities-role-of-nhs-
as-anchor-institution 
Example CPP CWB mapping and action plan Outer Hebrides March 2021 - 
https://www.cne-siar.gov.uk/media/17452/S%2019B%20-%20Appendix%20-
%20Community%20Wealth%20Building%20in%20the%20Outer%20Hebrides%20Action%
20Plan.pdf 
Page 43

Page 44

Classification: OFFICIAL
Appendix 1: CPP CWB recommendations from CLES report 2024 –
priorities May 2025 
The CWB Report prepared for Argyll and Bute CPP in 2024 contained 23 recommendations
split across the five pillars and one overarching workstream.  From January to May 2025 the
CPP’s CWB steering met to discuss priorities and a response to the CWB Bill.
Below we list the recommendations, where reviewed, with a priority ranking and a commentary
for next steps.
A. CPP Recommendations
Recommendation Priority Ease of
Implementation
Commentary
CWB intrinsic to
economic strategy
1 Medium Already embedded in economic strategy
refresh (section 1.3 page 5). How do we
track progress and embed in the work of
other partners?
- Captured in the Argyll and Bute
Economic Strategy Action Plan,
2024-27. 
- Annual review to assess how the
actions in the Economic Action
Plan aligns with CWB principles
but perhaps the CWB action plan
process contained in the Bill
supersedes this. 
Decide on correct
avenues to deliver
CWB across Argyll
and Bute 
1 Medium Requires collaboration across local
government and stakeholders
- Requirement for an overarching
CPP CWB Charter. 
Time-limited groups
for Models of
Opportunity
2 Easy/Medium Local group established for Cowal and
Bute promoting Community Ownership
in Renewable Energy schemes; third
meeting pending
Glenbarr example. 
Employee ownership - upskilling of
business support providers on this type
of model. 
Complicated agenda.
Map out good practice case studies,
including approaches and enablers. 
Awareness of existing resources such
as that provided by Co-operative
Development Scotland. 
B. PILLAR 1 - Spending
Recommendation Priority Ease of
Implementation
Commentary
Establish a CPP
procurement
working group
1 Easy A top priority - who and when?
- Working with organisational
procurement teams. Clear
Page 44

Page 45

Classification: OFFICIAL
guidance needed to Heads of
Procurement meetings with
regard to alignment with CWB
priorities. Ask specific questions. 
- Note template charter from
Stirling Council.
- Timing of the legislation and
associated activity prior to
publication for the legislation.
- Case study: scope to review
barriers for local contractors.
- Requirement for an overarching
CPP CWB Charter. 
Build collective
market intelligence
1 Easy What does this look like and how would
we share the findings to capacity build
local providers?
- Data on local suppliers is
captured by local heads of
function and GDPR issues to
consider.
- Opportunity to support supplier
capacity (register on PCS) for
shared services. 
Publish a collective
procurement
pipeline
1 Medium When, who and how?
Question to all CPP partners in sharing
forward procurement plans for 2025/26.
CPP meet the buyer
events
1 Medium Events scheduled with Council - capture
progress and evaluate next steps?
Partnership with Scotland Excel? NHS?
- Joint MTB events with all
partners - capture all contracts of
various scale. Not necessarily in
person MTB events; videos,
social media, etc.
Develop
procurement training
for suppliers
1 Medium Supplier training framework in
development
Aligns with MTB events such as Supplier
Development Programme and other
local training provision as appropriate. 
C. PILLAR 2 - Workforce
Recommendation Priority Ease of
Implementation
Commentary
Real Living Wage
Place
2 Medium Initial discussions with businesses
ongoing - inserted into contracts?
Legislative requirement.
Page 45

Page 46

Classification: OFFICIAL
Pathways into Work 2 Medium Pathways into work are being delivered
across Argyll and Bute driven by funding
streams such as NOLB and UKSPF.
Skills needs and demand assessment
for Argyll and Bute - align to work of
HIREP Skills and Labour Group.
Argyll and Bute
Employment Charter
2 Medium Requirement to draft charter under
consultation
Employment Charter
support
2 Medium Pulling and signposting existing
information, such as Skills for Growth,
Skills Development Scotland. Support
framework in early stages. 
D. PILLAR 3 - Inclusive Ownership
Recommendation Priority Ease of
Implementation
Commentary
Identify ownership
opportunities in
growth sectors
2 Medium Review of key sectors - who?
Review of co-
operative business
support
2 Medium Co-operative business support
structures to be reviewed - who?  Could
it be included in the TSI’s forthcoming
stakeholder survey?
Peer support
networks
2 Medium Develop connections between the
different networks to share resources
and identify gaps
Brokering supply
chain opportunities
2 Medium Discussions with key supply chain
entities ongoing via procurement teams. 
Sharing of knowledge and progress to
date? 
E. PILLAR 4 - Finance
Recommendation Priority Ease of
Implementation
Commentary
Mapping the
alternative financial
infrastructure
2 Medium Check in with national studies and
mapping exercises and identify any local
reviews and summaries
Mapping, pooling
and strategic
planning of
community benefits
1 Medium Place planning process means the
conversations are starting to be had with
some communities already along the
development/community trust path route. 
No uniformity in strategic approach yet
Page 46

Page 47

Classification: OFFICIAL
but groups seem willing to pool
resources, data and evidence. 
Community Benefits conversation
needed at a national and UK level
meaning this area is complex and time
consuming.
Develop a local
finance initiative
proposal
3 Hard Exploring viable finance models and
explore partnerships with existing
initiatives 
F. PILLAR 5 - Land and Property
Recommendation Priority Ease of
Implementation
Commentary
Vacant and derelict
land
3 Hard Land audit commenced
Rationalisation of the
public estate
3 Hard Public estate rationalisation strategy
under discussion
Convene a Local
Landowners Forum
3 Hard NFU representative engaged in
discussions 
Page 47

Page 48

Classification: OFFICIAL
Appendix 2: 
Argyll and Bute Community Planning Partnership
Community Wealth Building Charter
Our Commitment
We, the members of the Argyll and Bute Community Planning Partnership, affirm our
commitment to embedding the principles of Community Wealth Building (CWB) across
our region. As anchor institutions rooted in place, we recognise our collective power to
shape a fairer, more inclusive, and resilient local economy where wealth is created,
retained, and shared more equitably across our diverse communities.
Our Vision
To build an economy that works for people, place and planet—where wellbeing,
sustainability, and equity are core outcomes of economic activity. We will support and work
towards an inclusive model of development that maximises local opportunity and minimises
the extraction of wealth from our communities.
Our Shared Principles
We will advance the five pillars of Community Wealth Building:
1. Spending: Maximise community benefit through procurement, grow inclusive supply
chains, and support local enterprises to access public contracts.
2. Workforce: Promote Fair Work, support the real Living Wage, and develop inclusive
employment and training pathways in collaboration with local employers and
partners.
3. Inclusive Ownership: Support diverse and democratic business models, including
social enterprises, co-operatives, and employee-owned businesses, that root wealth
in local communities.
4. Finance: Use our financial power to support local investment, explore ethical and
social finance opportunities, and ensure community benefits are reinvested locally.
5. Land and Property: Make socially productive use of land and assets, support
community ownership, and collaborate to unlock affordable workspace and housing.
Our Role as Anchor Institutions
We acknowledge our responsibility as major employers, landowners, procurers, and
investors. We will:
• Embed CWB into our strategic plans and operational decisions.
• Act collaboratively through the CPP and local area groups to develop shared
strategies, joint investments, and coordinated actions.
• Build capacity in the third, social enterprise and community sectors to participate in
and shape our local economy.
• Engage citizens meaningfully in decisions that affect their economic future.
Our Next Steps
• Support progress towards implementation of CWB ahead of legislation with
reference to the Argyll and Bute CWB Action Plan and the two Models of
Opportunity on employee ownership and energy.
• Prioritise actions that align with our Local Outcome Improvement Plan, Economic
Strategy 2024–2034, and Climate Action priorities.
• Monitor progress transparently and share learning to accelerate transformation
across Argyll and Bute.
Signed on behalf of the Argyll and Bute Community Planning Partnership,
[Space for Signatures / Logos of CPP members]
June 2025 
Page 48

Page 49

Community Wealth Building priorities 6th June 2025
Takki Sulaiman
CPP CWB Steering Group member and Argyll and Bute TSI CEO
Page 49

Page 50

Community
Wealth
Building
“Community wealth building is a new people-centred 
approach to local economic development, which redirects
wealth back into the local economy, and places control and
benefits into the hands of local people”
- CLES (The Centre for Local Economic Strategies)
5 pillars
• Progressive procurement of goods and services
• Fair employment and just labour markets
• Plural ownership of the economy
• Making financial power work for local places
• Socially productive use of land and property
Page 50

Page 51

Overview of CPP CWB steering group activity
Two rounds of ACPG meetings – 
May and August 2024
Local CWB action group in
Helensburgh and Lomond
•Decision to tie in with the place
planning work
Shared ownership informal best
practice group – four meetings
•Spawned local energy community
benefits and ownership conversations CPP CWB workshop in
September 2024
Steering group meetings
November 2024 – April 2025
February 2025 steering group in
person workshop
•Prioritisation of recommendations and
action plan
•Explore linkages and opportunities with
other strategies
•Produce charter
June 2025 legislation and bill
response (May 2025) Not wait for legislation
CWB best practice hubs – EDAS 
announcement and
Improvement Service Hub
Page 51

Page 52

Prioritising the recommendations
Page 52

Page 53

Community
Wealth
Building –
priorities
• Review how the actions in the Economic
Action Plan aligns with CWB principles but
perhaps the CWB action plan process
contained in the Bill supersedes this?
• CPP Charter – can you sign up to this
through your governance processes? Is it
clear enough?
• All Pillar 1 (Spending) recommendations
prioritised
• Pillar 4 (Finance) priority on mapping
community benefits – uniformity in 
approach?
• All Land and Property recommendations
(Pillar 5) reviewed as ‘hard’ and a lower focus 
for now apart from continuing activity
Page 53

Page 54

Community
Wealth
Building –
Pillar 1
Procurement
Recommendation Priority Ease of
Implementation
Commentary
Establish a CPP
procurement
working group
1 Easy A top priority - who and when?
- Working with organisational procurement teams. Clear guidance needed to
Heads of Procurement meetings with regard to alignment with CWB
priorities. Ask specific questions.
- Note template charter from Stirling Council.
- Timing of the legislation and associated activity prior to publication for the
legislation.
- Case study: scope to review barriers for local contractors.
- Requirement for an overarching CPP CWB Charter.
 
Build collective
market
intelligence
1 Easy What does this look like and how would we share the findings to capacity build local
providers?
- Data on local suppliers is captured by local heads of function and GDPR
issues to consider.
- Opportunity to support supplier capacity (register on PCS) for shared
services.
 
Publish a
collective
procurement
pipeline
1 Medium When, who and how?
Question to all CPP partners in sharing forward procurement plans for 2025/26.
CPP meet the
buyer events
1 Medium Events scheduled with Council - capture progress and evaluate next steps?
Partnership with Scotland Excel? NHS?
- Joint MTB events with all partners - capture all contracts of various scale.
Not necessarily in person MTB events; videos, social media, etc.
Develop
procurement
training for
suppliers
1 Medium Supplier training framework in development
Aligns with MTB events such as Supplier Development Programme and other local
training provision as appropriate.
Page 54

Page 55

Community Wealth Building priorities 6th June 2025
Appendix and resources
Page 55

Page 56

Argyll and Bute recommendations
Spending
Establish a CPP
procurement working
group, Build collective
market intelligence,
Publish a collective
procurement pipeline,
CPP meet the buyer
events, Develop
procurement training
for suppliers
Workforce
Work towards a Living
Wage Place
Develop a Pathways into
work programme
Argyll & Bute
Employment Charter
Employment Charter
support.
Inclusive ownership
Identify ownership
opportunities in growth
sectors, Review of co-
operative business
support, Peer support
networks, Brokering
supply chain
opportunities
Finance
Mapping the alternative
financial infrastructure
Mapping community
benefits
Develop a local finance
initiative proposal.
Land & property
Affordable Workspace
Strategy
Vacant & derelict land
Rationalisation of the
public estate
Convene a Local
Landowners Forum
BC1: Building a more co-operative food &
tourism economy
BC2: Building community ownership of the
energy transition
Page 56

Page 57

CPP
Recommendations
and Models of
Opportunity
• CWB intrinsic to economic strategy
• Decide on correct avenues to deliver CWB
across Argyll and Bute
• Development of CWB time limited group(s)
CPP recommendations
• Building greater employee ownership in
Argyll and Bute
• Building community and shared ownership
of the energy transition
Models of Opportunity
Page 57

Page 58

This page is intentionally left blank

Page 59

Appendix 2: 
Argyll and Bute Community Planning Partnership
Community Wealth Building Charter
Our Commitment
We, the members of the Argyll and Bute Community Planning Partnership, affirm our
commitment to embedding the principles of Community Wealth Building (CWB) across
our region. As anchor institutions rooted in place, we recognise our collective power to
shape a fairer, more inclusive, and resilient local economy where wealth is created,
retained, and shared more equitably across our diverse communities.
Our Vision
To build an economy that works for people, place and planet—where wellbeing,
sustainability, and equity are core outcomes of economic activity. We will support and work
towards an inclusive model of development that maximises local opportunity and minimises
the extraction of wealth from our communities.
Our Shared Principles
We will advance the five pillars of Community Wealth Building:
1. Spending: Maximise community benefit through procurement, grow inclusive supply
chains, and support local enterprises to access public contracts.
2. Workforce: Promote Fair Work, support the real Living Wage, and develop inclusive
employment and training pathways in collaboration with local employers and
partners.
3. Inclusive Ownership: Support diverse and democratic business models, including
social enterprises, co-operatives, and employee-owned businesses, that root wealth
in local communities.
4. Finance: Use our financial power to support local investment, explore ethical and
social finance opportunities, and ensure community benefits are reinvested locally.
5. Land and Property: Make socially productive use of land and assets, support
community ownership, and collaborate to unlock affordable workspace and housing.
Our Role as Anchor Institutions
We acknowledge our responsibility as major employers, landowners, procurers, and
investors. We will:
• Embed CWB into our strategic plans and operational decisions.
• Act collaboratively through the CPP and local area groups to develop shared
strategies, joint investments, and coordinated actions.
• Build capacity in the third, social enterprise and community sectors to participate in
and shape our local economy.
• Engage citizens meaningfully in decisions that affect their economic future.
Our Next Steps
• Support progress towards implementation of CWB ahead of legislation with
reference to the Argyll and Bute CWB Action Plan and the two Models of
Opportunity on employee ownership and energy.
• Prioritise actions that align with our Local Outcome Improvement Plan, Economic
Strategy 2024–2034, and Climate Action priorities.
• Monitor progress transparently and share learning to accelerate transformation
across Argyll and Bute.
Signed on behalf of the Argyll and Bute Community Planning Partnership,
[Space for Signatures / Logos of CPP members]
June 2025 
Page 59

Page 60

This page is intentionally left blank

Page 61

CPP MANAGEMENT COMMITTEE
MEETING
Transport Scotland
Roads Directorate
…..improvements in the pipeline
over next ??? Years…..
Page 61
Agenda Item
8

Page 62

The Trunk Road Network……;
The whole network is 2,179 miles with around
880 miles within the NW unit of which my remit
as Area Manager for TS Roads…..;
• A82, A83, A85, A828
• Total of around 225 miles of trunk road within Argyle & Bute Council
boundaries
(& also A84, A87, A887, A830…..a further 275 miles)
Network Maintenance Contract within the NW
Unit is BEAR Scotland
Page 62

Page 63

Improvement Schemes…..;
Examples of Schemes…..;
We have a wide range of schemes currently identified which include the following…..;
Road widening schemes, Assess & remedial works at a number of “Landslide Risk Areas”, affected areas by flooding and river erosion,  number of NMU improvements (or Active Travel
schemes) and lay by improvements throughout the network…..
..…as well as the routine inspections, sign cleaning, landscape, structural, rock slope, seawall, drainage maintenance and VRS renewal schemes to maintain the network…..
A828 Ledaig, rock slope
A83 Erines, widening
A83 Furnace, river erosion
Page 63

Page 64

A82 Tarbet to
Inverarnan…..;
A82 Tarbet to Inverarnan Story Map ….website link….
Reasons why the need for improvements…..;
Examples of proposals…..;
The route…..;
Page 64

Page 65

Rest and Be
Thankful…..;
Major Event of 2020;
Preferred Option – Long Term Solution – Debris Flow Shelter;
Event of Feb. 2024;
Event of Sep. 2024;
A83 Rest and Be Thankful Story Map….website link….
Page 65

Page 66

Our directorates
Low Carbon Economy
Responsible for working across
Government and with our partners
and stakeholders, to create the
conditions for Scotland to lead in
and benefit from the shift to ultra-
low emission vehicles.
Roads
Responsible for the safe operation
of the Trunk Road Network, roads
policy, air quality and the
environment, transport resilience
and transport planning for major
events.
Finance and Corporate
Services
Provides core services and advice in
finance, human resources, learning
and development, information
technology, facilities, health and
safety, chief executive support,
communications and corporate
governance.
Major Projects
Responsible for the design,
development, procurement and
construction of major trunk road
improvement projects across
Scotland, along with providing
procurement advice across the
organisation.
Bus, Accessibility
and Active Travel
Responsible for the Scottish
Government’s policy relating to bus,
active travel, smart and integrated
ticketing and accessible travel.
Transport Strategy
and Analysis
Responsible for transport strategy
and integration, transport futures,
transport analysis and strategic
transporting planning.
Aviation, Maritime,
Freight and Canals
Promotes Scotland’s international
connectivity and transport links to
our remote and island communities.
Rail
Responsible for Scotland’s rail policy,
specification and development as
well as the funding of Scotland’s rail
infrastructure, passenger and freight
services through rail industry delivery
partners.
Ferries
Promoting connectivity of our islands and remote
communities through contract management,
vessel and infrastructure replacement and the
Islands Connectivity Plan.
.
Page 66

Page 67

New Islay
Vessels
and Port 
Enabling Works
Page 67

Page 68

Caledonian MacBrayne Clyde & Hebridean Ferries
Confidential – Do not distribute without 
express permission of CalMac Ferries Ltd.
Agenda
Ø Vessel Update
Ø CalMac Operational Readiness
Ø Port Enabling Works Update
o Kennacraig
o Colonsay
o Port Askaig 
o Port Ellen
Ø Questions
Page 68

Page 69

Caledonian MacBrayne Clyde & Hebridean Ferries
Vessels Update
CalMac expects the MV Isle of Islay delivery
will be in Q3/2025 and will enter into service 
on the CalMac network shortly thereafter  
This is subject to successful completion of
commissioning, sea trials, compartment
completion, Classification Society, and MCA
surveys.
The remaining New Islay Class vessels are
scheduled for delivery at 6-month intervals
thereafter.
Page 69

Page 70

Caledonian MacBrayne Clyde & Hebridean Ferries Information Classification: Internal 4
Operational Readiness
CalMac are working on Operational Readiness in preparation for the arrival of the new vessels,
these activities include: 
• Timetabling
• Retail preparations
• Customer preparations
• Crewing and training
• IT installation and testing
• Communications planning
• Delivery to Operations (DTO)
The DTO plan will be carried out over a period of 8 weeks prior to the vessel entering service on the 
Islay route. This period is inclusive of the 2 weeks voyage from Turkey to the UK, followed by 6 weeks 
of Operational Readiness, Crew Familiarisation and full berthing trials across the network.  
Page 70

Page 71

Caledonian MacBrayne Clyde & Hebridean Ferries Information Classification: Internal 5
Port Enabling Works
Ø CMAL are required to undertake port enabling works at Kennacraig, Port Askaig and Colonsay to accommodate
the new Islay vessels. There is a separate project underway for the development at Port Ellen. 
Ø Kennacraig serves as the mainland port for both the Port Ellen and Port Askaig services, featuring connections to
Colonsay on Wednesdays and Saturdays, contingent upon the Winter or Summer timetable period. 
Update on progress of works:
• Kennacraig: All fendering and dredging works are now complete. Additionally, progress has been made on the
electrical works to enable shore power infrastructure. Some minor works remain ongoing until early Summer.
• Port Askaig: All marine works are complete, and the Mooring Aid has been installed, awaiting testing when MV
Isle of Islay is delivered. 
• Colonsay: Colonsay works completed at the end of last year with some remedial works outstanding, these have
now been rectified, and contractors are demobilising from site.
• Port Ellen: Timeline for programme of works still to be finalised, construction works duration is expected to be
approximately two years.
Page 71

Page 72

Caledonian MacBrayne Clyde & Hebridean Ferries Information Classification: Internal 6
Any Questions?
Page 72

Page 73

Private Sector
Settlement Officer
COMMUNITY PLANNING PARTNERSHIP
MANAGEMENT COMMITTEE
FRIDAY, 6TH JUNE 2025
Page 73
Agenda Item
10

Page 74

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
What is a Private Sector
Settlement Officer?
 Part of the Council’s Housing Strategy Team
 Funded through the Scottish Government’s
Addressing Depopulation Fund
 Two-years of funding over 2024/25 - 2025/26
 Primary aims of the project are to:
1. Provide support to landlords to mitigate the
anticipated reduction of the private rented
sector
2. Support the delivery of alternative tenure
opportunities, alongside partners
3. Support the delivery of actions to address
depopulation and combat the Housing
Emergency
Page 74

Page 75

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
How does it link with the
Community Planning Partnership?
The Argyll and Bute Outcomes Improvement Plan (ABOIP) identified
Housing as one of 3 key outcomes.
Action Links
Working in effective partnerships to ensure
that everyone living and working in Argyll
and Bute has access to affordable, warm
homes of the right size, in the right place
with access to the services, amenities and
economic opportunities that communities
need to thrive
• Work to preserve the private rented
sector in Argyll & Bute
• Work to encourage those living in Argyll
& Bute, or looking to move to Argyll &
Bute, to use HOME Argyll to register their
housing need and demand
• Research being undertaken to track
housing options and investigate
workforce housing options
Page 75

Page 76

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Aim Links
Ensuring that plans and policies are
informed by communities’ needs and
aspirations, especially those facing the
greatest inequalities in housing related
outcomes
• Liaising with the Community Housing
Network and community groups to
quantify local need and demand for
housing
• Exploring alternative tenure opportunities
for those with difficulty accessing housing
Working with partners and communities to
ensure that everyone has the ability to
have a say in shaping what housing looks
like for their place
• Research project being undertaken to
gather the views of underrepresented
and hard-to-reach groups in relation to
the Housing Emergency
Reviewing partners’ land and property
assets to ensure resources are used
effectively to support the provision of
housing for key workers and others
• Links with Empty Homes Officer – HSCP, to
identify housing opportunities for workers.
• Research project will aim to design and
coproduce workforce housing options
Working together to identify opportunities
for the prevention of homelessness through
early intervention
• Work to reduce homelessness risks
associated with largescale reduction of
the PRS
Page 76

Page 77

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
How can CPP Partners help?
 Encourage employees and
community groups to use HOME
Argyll to register interest in
alternative tenure opportunities
 Engage with the upcoming survey
work around the Housing
Emergency and Workforce Housing
Options
 Help us to advertise the work being
carried out to engage with younger
and working-age households as
part of the upcoming research
 Signpost clients, employees and
community groups to these services
Page 77

Page 78

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Get in Touch
Contact Iona Campbell
Phone – 01436 658 801
E-mail – iona.campbell2@argyll-bute.gov.uk
Page 78

Page 79

SERVICE
DELIVERY
REVIEW
SCOTTISH FIRE
AND RESCUE SERVICE
Page 79
Agenda Item
11

Page 80

SFRS: SERVICE DELIVERY
REVIEW
BACKGROUN
D
The Service Delivery Review is looking at all aspects of the operational
models of SFRS to meet Scotland’s changing risks and demands,
including:
Where our
stations are
based; and
How we
staff our
appliances
Page 80

Page 81

SFRS: SERVICE DELIVERY
REVIEW
KEY
OBJECTIVES
We need to match our
operational resources
to risk and demand.
Further desired
outcomes include:
Reduced capital investment backlog
Better utilisation of resources and facilities
Enhanced firefighter safety
Improved staff attraction and retention
Increased organisational capacity
Enhanced community safety (through PPP)
Improved partnership working
1
2
3
4
5
6
7
Page 81

Page 82

SFRS: SERVICE DELIVERY
REVIEW
X
STRATEGIC
PRIORITIES
Temporary
appliance
withdrawals
Our Estate:
RAAC /
capital
backlog
Station
upgrades for
decontamination
and dignified
facilities
Matching
operational
resource to
risk and
demand
Long-term
dormant
stations
X
Page 82

Page 83

Trade union /
representative body:
<1%
Member of
the Public:
45%
SFRS
Operational
Staff: 25%
SFRS
Support
Staff: 5%
Other emergency service: 2.5%
Other Public Org
(e.g. NHS): 4%
Community Group: 4%
3rd Sector /
Voluntary Org: 4%
Other:
4.5%Elected
member: 1%
Business /
Commerical Sector:
2%
Local Authority:
2%
YOU ANSWERED:KEY FINDINGS
We received 6,400+ responsesPercentage of respondents that agree
SFRS should consult fully with the public
Proposed
station
closure86%
48%
76%
19%
Proposals to
build a new
station
Permanent
relocation or
removal of an
appliance
Proposed
changes to
duty systems
SFRS: SERVICE DELIVERY
REVIEW
SHAPING OUR FUTURE SERVICE:
YOUR SAY
Page 83

Page 84

SFRS: SERVICE DELIVERY
REVIEW
LOCAL PROPOSALS
HoClose the long-term dormant Ultralight Appliance OC VDS station at Colintraive
Close the long-term dormant Ultralight Appliance OC VDS station on the Isle of Kerrera
•taChange Helensburgh 2 Pump WT + OC station to a 2 Pump DSDS/OC + OC station
 
Page 84

Page 85

SFRS SDR: LSO AREA
BRIEFING
SDR TIMELINE 2025
Development
of options
long-list
(300+)
Jul-Sep 2024
Options
development:
Senior
leaders’
workshops
Apr 2025
Options
appraisal:
Balanced
room
Oct-Nov
2025
Review of
responses
Jan 2025
Options appraisal:
Hurdle criteria
workshop
June to Sep 2025
Public consultation
(12 weeks)
Apr-Jun 2024
Pre-
consultation
‘Shaping Our
Future Service:
Your Say’
Dec 2025
SFRS Board
decision
Page 85

Page 86

THANK YOU
Page 86