Agenda 
Audit Committee
Date:  Wednesday, 24 September 2025 
Time:  10:00 
Venue:  Council Chambers, Clydebank Town Hall, Clydebank G81 2NT 
Contact: Lynn Straker, Committee Officer 
lynn.straker@west-dunbarton.gov.uk 
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Audit Committee as detailed above.
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive  
Page 1

Page 2

Distribution: 
Councillor Gordon Scanlan (Chair)
Councillor Sophie Traynor (Vice Chair)
Councillor Ian Dickson
Councillor Michelle McGinty
Councillor John Millar
Councillor Lauren Oxley
Councillor Martin Rooney 
Councillor Clare Steel 
All other Councillors for information 
Chief Executive
Chief Officers 
Date of Issue: 10 September 2025
Page 2

Page 3

AUDIT COMMITTEE 
WEDNESDAY, 24 SEPTEMBER 2025 
AGENDA 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
3 MINUTES OF PREVIOUS MEETING       5 - 8 
Submit for approval, as a correct record, the Minutes of Meeting of the Audit
Committee held on 11 June 2025.   
4  OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
5 STRATEGIC RISKS 2022-2027       9 - 31   
Submit report by Chief Officer – People and Technology providing an update on the
strategic risks for 2022-2027. 
6 INTERNAL AUDIT PLAN 2024/25        33 - 54 
PROGRESS TO 31 JULY 2025  
Submit report by Chief Officer – Resources advising of progress to 31 July 2025
against the Internal Audit Plan for 2024/25.   
7 EXTERNAL AUDIT PROGRESS REPORT      55 - 63     
Submit report by Chief Officer – Resources advising Members of the outcome of
investigations into allegations and disclosures in line with public interest disclosure
and business irregularities policies received by Internal Audit between 1 November
2024 and 31 March 2025. 
8 2024/2025 TREASURY MANAGEMENT ANNUAL REPORT   65 - 80      
Submit report by Chief Officer – Resources advising Members of the treasury
function and its activities in 2024/25 and requesting that the Committee remits the
report to the full Council for its approval. 
Page 3

Page 4

___________________________________________________________________ 
Page 4

Page 5

AUDIT COMMITTEE 
At a Meeting of the Audit Committee held in Civic Space, 16 Church Street,
Dumbarton on Wednesday, 11 June 2025 at 2.00 p.m. 
Present: Provost Karen Murray Conaghan and Councillors Ian Dickson,
Fiona Hennebry, John Miller, Martin Rooney, Gordon Scanlan,
and Sophie Traynor. 
Attending:  Peter Hessett, Chief Executive; Laurence Slavin, Chief Officer –
Resources; Andi Priestman, Shared Service Manager – Audit
and Fraud; Julie Slavin, Chief Financial Officer – HSCP; Carol
Alderson, Finance Manager; Craig Wilson, Maintenance
Manager; Andrew Brown, Senior Education Officer; Tom Reid,
External Auditor – Forvis Mazars and Lynn Straker, Committee
Officer. 
Apologies: Apologies for absence were intimated on behalf of Councillor
Clare Steel. 
Councillor Gordon Scanlan in the Chair 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Audit Committee held on 19 February 2025 were
submitted and approved as a correct record. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
INTERNAL AUDIT PLAN 2024/25 – PROGRESS TO 30 APRIL 2025 
A report was submitted by Chief Officer – Resources advising Members of progress
to 30 April 2025 against the Internal Audit Plan for 2024/25.
Item 3
Page 5

Page 6

After discussion and having heard the Shared Service Manager – Audit and Fraud
and the Maintenance Manager in further explanation of the report and in answer to
Members’ questions, the Committee agreed to note the content of this report. 
PUBLIC INTEREST DISCLOSURES AND OTHER INTERNAL AUDIT
INVESTIGATIONS 1 NOVEMBER 2024 TO 31 MARCH 2025 
A report was submitted by Chief Officer – Resources advising Members of the
outcome of investigations into allegations and disclosures in line with public interest
disclosure and business irregularities policies received by Internal Audit between 1
November 2024 and 31 March 2025. 
After discussion and having heard the Shared Service Manager – Audit and Fraud
and the Maintenance Manager in further explanation of the report and in answer to
Members’ questions, the Committee agreed to note the content of this report. 
EXTERNAL AUDIT PROGRESS REPORT 
A report was submitted by Director of External Auditor – Forvis Mazars, providing an
update on the External Audit Progress report. 
After discussion and having heard the External Auditor and Chief Officer - Resources
in further explanation of the report and in answer to Members’ questions, the
Committee agreed to note the External Audit Progress Report and note the update to
the External Audit Strategy and Plan. 
EXTERNAL AUDIT ENQUIRIES – 2023/24 ACCOUNTS 
A report was submitted by Chief Officer – Resources informing Members of External
Audit’s requirement for the provision of information regarding the Council’s approach
to dealing with fraud, litigation, laws and regulations as part of their audit of the
Council’s 2023/24 Statement of Accounts and 2023/24 Trust Accounts. 
After discussion and having heard the Chief Officer - Resources in further explanation
of the report and in answer to Members’ questions, the Committee agreed:- 
(1) to consider the enquiries for those charged with governance for the 2023/24
Council Accounts and 2023/24 Trust Accounts; and 
(2) to approve the submission of the draft responses set out in Appendix 1 for the
Council and appendix 2 for the Trust Funds to the Council’s external auditors. 
INTERNAL AUDIT ANNUAL REPORT TO 31 MARCH 2025 
A report was submitted by Chief Officer – Resources advising Members of the work
undertaken by Internal Audit in respect of the 2024/25 Annual Audit Plan and
Page 6

Page 7

advising Members of the contents of the Assurance Statement given to Members of
West Dunbartonshire Council, the Chief Executive and the Section 95 Officer (Chief
Officer - Resources) in support of the Annual Governance Statement. This report
outlines how audit assurances are obtained. 
After discussion and having heard the Chief Executive and the Shared Service
Manager – Audit and Fraud in further explanation of the report and in answer to
Members’ questions, the Committee agreed to note the contents of this report. 
ANNUAL REPORT ON THE AUDIT COMMITTEE 
A report was submitted by Chief Officer – Resources providing Members with the
Audit Committee Chair’s 2024/25 Annual Report on the Audit Committee. 
After discussion and having heard the Shared Service Manager – Audit and Fraud
and the Chief Officer - Resources in further explanation of the report and in answer to
Members’ questions, the Committee agreed:- 
(1) to review and endorse the Chair’s Annual Report on the Audit Committee for
2024/25; and 
(2) that the report should be presented to a future meeting of the Council in line
with best practice guidance. 
REVIEW OF INTERNAL AUDIT CHARTER 
A report was submitted by Chief Officer – Resources providing Members with the
updated Internal Audit Charter (the Charter) for approval. It was noted the Charter
defines the terms of reference for the Council’s Internal Audit function to carry out its
role to enable the Chief Audit Executive to prepare the annual Internal Audit opinion
on the adequacy of the Council’s overall control environment. 
After discussion and having heard the Shared Service Manager – Audit and Fraud in
further explanation of the report, the Committee agreed to approve the revised
Internal Audit Charter. 
CODE OF GOOD GOVERNANCE AND ANNUAL GOVERNANCE STATEMENT
2024/25 
A report was submitted by Chief Officer – Resources advising Members of the
outcome of the annual self-evaluation undertaken of the Council’s compliance with
its Code of Good Governance and inviting Members to consider the Annual
Governance Statement that will be published in the Council’s Abstract of Accounts. 
After discussion and having heard the Shared Service Manager – Audit and Fraud in
further explanation of the report, the Committee agreed:- 
Page 7

Page 8

(1) to note the outcome of the recent self-evaluation process in considering how
the Council currently meets the agreed Code of Good Governance, together
with the issues identified and improvement actions; and 
(2) to consider the detail of the Annual Governance Statement and approve the
actions identified by management to improve the internal control environment. 
TREASURY MANAGEMENT STRATEGY AND ANNUAL INVESTMENT
STRATEGY 
A report was submitted by Chief Officer – Resources providing Members with the
opportunity to further scrutinise the Treasury Management Strategy Statement and
Annual Investment Strategy and the indicators contained within. 
After discussion and having heard the Finance Manager in further explanation of the
report and in answer to Members’ questions, the Committee agreed:- 
(1) to approve the proposed Treasury Management Strategy Statement and
Annual Investment Strategy and the indicators contained within; 
(2) to approve the continued use of the Asset Life Method (using either annuity or
equal instalment) for the repayment of loan fund advances with the exception
of spend to save schemes where the funding/income profile method could be
used; 
(3) to approve the ability to continue to use countries with a sovereign rating of AA
and above; 
(4) to note the removal of Lender Option Borrowing Option as an approved source
of borrowing; and 
(5) to note the report will be referred to Audit Committee for further scrutiny. 
GLOBAL INTERNAL AUDIT STANDARDS 
A report was submitted by Chief Officer – Resources informing Members of the new
Global Internal Audit Standards (UK public sector) that came into effect from 1 April
2025 and internal audit teams in the public sector will be working to implement these
new internal audit standards by 31 March 2026. 
After discussion and having heard the Chief Officer – Resources and the Shared
Service Manager – Audit and Fraud in further explanation of the report and in answer
to Members’ questions, the Committee agreed to note the contents of this report and
note that further update reports will be provided during 2025/26 in relation to the new
Global Internal Audit Standards (UK public sector). 
The meeting closed at 2.58 p.m.
Page 8

Page 9

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Audit Committee - 24 September 2025
___________________________________________________________________
Subject: Strategic Risks 2022-2027
1. Purpose
1.1 To provide an update on the strategic risks for 2022-27.
2. Recommendations
2.1 It is recommended that the Committee note:
 The strategic risks as detailed at Appendix 1.
3. Background
3.1 The Council’s 2022 – 2027 strategic risks were agreed by the Corporate
Services and Audit Committees in November 2022. The appended risks have
been reviewed with re-assessment undertaken before being reported to this
committee. This report is submitted as agreed to Audit Committee on a bi-
annual basis.
4. Main Issues
Strategic Risk
4.1 In line with the Council’s Risk Management Framework, a re-assessment of
the Strategic Risks has taken place as detailed within Appendix 1. Each risk is
managed through internal controls, linked actions and associated milestones
with the objective being to reduce or stabilise the level of risk through
completion of linked actions over a period and/or ensure mitigation factors are
adequate should the risks actually materialise.
4.2 Table 1 represents a risk dashboard that includes information on the original,
current and target rating for each strategic risk, as well as an assessment of
the current risk status. Each strategic risk is identified and supported by more
detailed information available on a “drill-down” basis in Appendix 1.
Six strategic risks, associated actions and milestones are met and are
progressing as expected whilst getting closer to reaching their assigned
targets. SR001, SR005, SR007, SR008, and SR011 are currently off target,
which is explained in further detail below.
Item 5
Page 9

Page 10

Table 1 Key Strategic Risk Information
Strategic Risk Original
Risk
October
2022
Current
Risk
August
2025
Target
Risk
March
2027
Risk Status
Rationale
SR 001  Significant
financial funding
reductions/limitations
from Scottish Government
SR 002  Challenges in
implementing broad-
ranging school
improvement to raise
attainment and
achievement
SR 003  Maintaining
Council Assets that are fit
for purpose
SR 004  Keeping abreast
of developments in the
innovative use of
Information Technologies
SR 005  Engaging
positively with Residents,
Communities &
Partnerships
SR 006  Challenges in
protecting the Health and
Safety of Employees and
Others
SR 007  Complexities in
ensuring an appropriately
resourced and resilient
workforce
Page 10

Page 11

Risk Methodology and Reporting
4.3 Each strategic risk is populated in Pentana in terms of the following template:
 Risk title and code;
 Description;
 Ownership;
 Potential effect;
 Measures of impact;
 Risk factors;
 Internal controls;
 Risk opportunity; and
 Linked actions.
4.4 Each risk has been scored using a “4 x 4” matrix for likelihood and impact in
relation to:
 Current risk (with review dates set at pre-determined intervals); and
 Target risk (i.e. 31 March 2027 - the duration of the Strategic Plan).
The risk descriptors used in the “4 x 4” matrix are as follows:
SR 008 Threat of Cyber
Attack
SR 009  Challenges in
delivering effective
services in relation to
Roads & Neighbourhoods
SR 010  Failure to
maintain Housing Stock
SR 011  Inability to
reduce carbon footprint in
line with targets
Page 11

Page 12

Likelihood 
Score Descriptor
1 Unlikely
2 Likely
3 Very likely
4 Certain
Impact
Score Descriptor
1 Minor
2 Moderate
3 Significant
4 Critical
4.5 For ownership, each strategic risk is “Managed By” a Chief Officer and
“Assigned To” a Senior Officer. Strategic risks are also reported on a bi-
annual basis to the Performance & Monitoring Review Group.
Service Risk
4.6 Following the methodology in 4.3 to 4.4 above, each service has owned
operational risk registers in Pentana (the Council’s performance system)
which were reviewed as part of the 2025/26 service planning process.
4.7 Significant financial funding reductions/limitations from Scottish Government
While there has been a cash increase in funding in 2025/26 this was
fundamentally due to sizable increases in revenue being raised through
taxation as part of the Autum 2024 UK Budget statement. This is not expected
to be a recurring situation and therefore the Council will continue to be faced
with significant real term funding reductions from the Scottish Government
settlement. This coincides with a period where costs are continuing to rise in
relation to social care, significant inflationary increases and continuing pay
award pressures. Whilst there are ongoing discussions between the Scottish
Government and Local Government aiming to reduce the ring fencing of
funding, the reality is that material elements of funding remain ring fenced
which significantly restricts how the Council can most effectively use the funds
made available to it.
4.8 Engaging positively with Residents, Communities & Partnerships
This risk remains unchanged despite the positive work being under-taken
across the community planning partnership. There continues to be resourcing
and financial constraints that limit the number of communities that the
Communities Team can engage with.
Page 12

Page 13

4.9 Threat of Cyber Attack
This risk will always be high as the threat and likelihood of a Cyber Attack
remains.
The UK public sector is still experiencing elevated levels of targeted Cyber-
attacks including recent attacks on Scottish councils and high-profile attacks
on UK retail organisations. As this risk continues to be high the emphasis
remains on proactive measures to protect the confidentiality, integrity and
availability of our data, critical infrastructure, and overall business operations.
Key risks and continual threats include:
 Demand for emerging technologies such as Artificial Intelligence solutions
present new challenges for the council to implement and secure.
 Risk to Backup technology and corruption of council data.
 Ransomware attacks – surged in recent years, potential for significant
financial loss and operational disruption.
 Advanced Persistent Threats (APT’s) – sophisticated stealthy attacks
conducted by well-resourced groups, targets include critical infrastructure,
government bodies and large corporations.
 User awareness – Phishing attempts on the rise with more sophisticated
techniques being deployed including voice and text phishing.  Targeted
threats tailored to specific areas of the Council are being observed. Social
Engineering attacks now present a higher risk.
 Third Party Risks – The Council often relies on third party vendors and
suppliers, increasing the risk of cyber-attacks through the supply chain.
Mitigations:
 Continual improvement of our vulnerability/patch management systems
and processes.
 Continual promotion of Cyber awareness through simulated phishing
campaigns supported by our online security training and awareness
platform.
 Social Engineering guidance issued to all employees.
 Engagement with ICT Security Partners to highlight and advise on specific
areas of risk.
 Continual assessment and improvement of our Cyber Security posture.
 Robust Business Continuity and Disaster Recovery plans with a new
backup policy in development.
Progress continues to take place to improve our security posture in line with
the national Public Sector Action plan (PSAP) and Public Sector Network
(PSN) compliance. Vigilance of the National Cyber Security Centre (NCSC)
Cyber Security guidance continues to remain in place.
Page 13

Page 14

4.10 Complexities in ensuring an appropriately resourced and resilient workforce
The risk rating remains scored at a 6. The difficult funding position means an
impact on an appropriately resourced and resilient workforce is expected
however the severity of this remains unclear. Services are reviewing
structures and service delivery models in light of the council's financial
challenges.
The Workforce Planning Strategy is in place for 2022-2027. Additionally, the
People First Strategy covers the same period and consolidates several areas:
well-being, employee engagement, workforce planning, learning and
development and digital. A robust package of wellbeing resources continues
to be available, the council is recognised as a leading employer in terms of
adapting flexible working practices, attendance levels are closely monitored,
with personal stress and minor ailment absences currently prevalent.
M 365 Share point rollout continues with a second pilot about to commence.
SMN in June focused around digital capabilities and transformation
opportunities. Meetings with SMTs are planned to commence in September
where discussions on how best to utilise digital leads and champions will be
taken. To further support this the digital team continue to add digital tools to
the intranet page the most recent being digital duel and a digital dilemma.
Services are currently working on structures and service delivery whilst
considering the difficult financial funding position and the impact of this will be
closely supported and monitored.
There have been reductions across the people support functions and this has
increased the challenges in supporting services. It has been agreed to invest
an additional resource into the digital team to support fit for future. Fit for
Future will be used to review processes, maximise digital opportunities,
remove waste and keep costs low
4.11 Inability to reduce carbon footprint in line with targets
The risk of non-delivery of carbon emissions targets remains significant to
reflect the increasing gap between actual and target Co2 emissions. There
has been a long-term vacancy within the Climate Change and Energy Team
that continues to impact progress of the Climate Change Action Plan. The
Climate Change and Energy Team continue to work across the Council to
promote active participation from all service areas and to support a reduction
of emissions
Page 14

Page 15

5. People Implications
5.1 There are no people implications associated with this report, other than in
relation to the mitigation of risk.
6. Financial and Procurement Implications
6.1 There are no financial and/or procurement implications directly associated
with this report however there are in relation to any expenditure linked to
mitigation.
7. Risk Analysis
7.1 Failure to ensure robust risk management is likely to result in the Council
being criticised by External Auditors for not having an integrated approach to
embedding risk management within the authority with the result that a “no
scrutiny required” status would not be achieved.
7.2 Progressing with a robust risk management approach will demonstrate that
the Council is taking ownership of risk management and ensuring effective
measures are in place. The ability to demonstrate risk ownership should
benefit the Council in terms of:
 Understanding risk and its potential impact on the Council’s priorities and
objectives;
 Reducing insurance premiums going forward by recognising that a mature
approach to risk management will contribute to a reduction in the number
and value of claims across a range of insurance classifications;
 Contributing towards incident prevention based upon post-incident
investigation;
 Meeting statutory/regulatory requirements; and
Ensuring better partnership working with external and internal partners.
8. Equalities Impact Assessment (EIA)
8.1 EIA 548 notes the positive impacts of an approach to risk that integrates
considerations on equalities, human rights health and social and economic
impacts that is aligned with the content of the new Strategic Plan.
9. Consultation
9.1 The strategic risks have been discussed with the Chief Officers and senior
management. The reports to committee are available to the Trades Union and
consultation undertaken as required.
9.2 The strategic risks have been cross checked with WD HSCP. This ensures
that issues affecting HSCP are reflected within the wider council strategic risk
report.
Page 15

Page 16

10. Strategic Assessment
10.1 At its meeting on 26 October 2022, the Council agreed that its four main
strategic priorities for 2022 - 2027 are as follows:
 Our Communities - Resilient and Thriving
 Our Environment - A Greener Future
 Our Economy - Strong and Flourishing
 Our Council - Inclusive & Adaptable
10.2 The strategic risks have been identified to complement and underpin all
strategic priorities.
Name:   Victoria Rogers
Designation:   Chief Officer People & Technology
Date:   21st August 2025
Person to Contact: Harry McGhie, Risk & Health and Safety Officer
Harry.McGhie@west-dunbarton.gov.uk
Appendices: Appendix 1: Detailed Strategic Risk List
Background Papers: West Dunbartonshire Council Strategic Plan 2022-2027
Risk Management Framework
EIA screening
Page 16

Page 17

Strategic Risk Report
Generated on: 21 August 2025
SR 01 Significant financial
funding reductions /
limitations from Scottish
Government
It is expected the Council will continue to be faced with significant real term
funding reductions from the national settlement. This is based on local
government settlements in recent years (with the exception of 2025/2026).
This coincides with a period where costs and demographic pressures are
continuing to rise in relation to social care, significant inflationary increases,
the impact of previous years increases in the bank interest rate and pay
award pressures linked to inflation. Whilst there are ongoing discussions
between the Scottish Government and Local Government on reducing the ring
fencing of funding the reality is that material elements of funding remains
ring fenced which significantly restricts how the Council can most effectively
use the funds made available to it.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
11-Aug-
2025 16 31-Mar-2027 4 Laurence Slavin
Potential Effect
Shortfall in finances resulting in the Council being unable to provide all services as intended and needing to
identify further cuts to services to deliver a balanced budget. This extends to those services delegated by
the Council to the Health and Social Care (HSCP) Board.
Measures of
Impact
- Real terms reduction in Scottish Government settlement
- Demographic change (population decline/growth, aging population)
- Cost reduction required including reducing level and/or quality of service provision
- Increased Debt (collection of Council Tax, HRA rents, etc)
-Depletion of reserves
Risk Factors
- Insufficient funding to retain essential services and fully fund policy commitments.
- Lack of time to plan for changes in the level of grant funding due to single year settlements
- General inflationary factors
- Instability of Bank of England Base Rate
- Significant additional cost pressures, driven by demographic profile.
- Insufficient capital receipts to cover loan repayments (creating a revenue pressure)
Internal Controls
- Long Term Financial Strategy
- Regular Financial Updates to Council
- Monitor and maintain General Services and Housing Revenue Account prudential targets
- Reporting and monitoring of Treasury Management Strategy
- Budgetary control process
- Regular budgetary control and savings monitoring reports provided to CMT and Council / committees
- Active engagement with HSCP Chief Officer on financial performance and budget planning
- Rigorous debt collection processes
- Annual Internal Audit Plan
- Work of External Auditors (external control)
- Annual Governance Statement
Latest Note
Assumptions on future funding levels and other material budget assumptions are updated regularly and
reported to Council periodically throughout the year. It is expected that future settlement funding will be
insufficient to pay for current levels of service delivery. Furthermore, it is expected future local government
settlements will be a real terms reduction in local government funding, including those services delegated
to the HSCP Board.
Risk Opportunity
-Significant council projects focusing on long term economic development in the West Dunbartonshire area
to grow the local economy and generate revenue
- Annual exercise to identify efficiencies
- Projects to implement new ways of working (e.g. digitisation, automation, asset management)
Linked Actions Code & Title Progress Status Assigned To
RES/25-26/005 Review ways to improve rent collection rates in
conjunction with Housing and W4U Ryan Chalmers
Item 5
Appendix 1
Page 17

Page 18

RES/25-26/004 Review ways of decreasing corporate debt through
continued improvements to debt collection processes in relation to
sundry, NDR, Council Tax and rent
Ryan Chalmers
SR 02 Challenges in
implementing broad-ranging
school improvement to raise
attainment and achievement
This risk concerns delivering excellence and equity for children and young
people. National and local indicators have been set to monitor progress with
outcomes relating to attainment and achievement with a key focus on making
progress to narrow the poverty related attainment gap.
Scottish Equity funding devolved to local authorities aims to deliver on
priorities between 2023-26. This funding will end in 2026.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
12-Aug-
2025 4 31-Mar-2027 2 Julie McGrogan
Potential Effect
Improved outcomes for young people would not be attained and achieved.
The Council would fail to meet the needs of individual learners particularly those children and young people
most disadvantaged by poverty.
Risk of reputational damage to the service and the wider Council if outcomes and targets not as education
as a statutory service is subject to close scrutiny of local authority performance with outcomes for children
and young people by the local community and by the national agencies.   
Measures of
Impact
Stretch Aims and Targets for attainment and achievement 3-18 et to be achieved by 2026. The Stretch
Aims  are scrutinised annually by Scottish Government and Education Scotland.
West Dunbartonshire Performance Targets for attainment and narrowing the poverty related attainment
gap in Early Years, Broad General Education and Senior Phase
West Dunbartonshire Improvement Board Quality Indicator Evaluations
National Qualifications Attainment and Achievement Results
Broad General Education Achievement of  Level Results
West Dunbartonshire Scottish National Standardised Assessment Data
Positive Destination Data
West Partnership Attainment , Equity and Destination Performance Measures
Her Majesty’s Inspectors of Education inspection reports
Stakeholder Feedback
Risk Factors
Reduced funding 2022 -2026; no confirmation of future funding from 2026:
This Strategic Priority  has been supported by Scottish Government Attainment Challenge Funding since
2015 and since 2022 Strategic Equity Funding. Also, schools in West Dunbartonshire have received Pupil
Equity Funding since 2016. The national funding streams are committed to until 2026 – there is uncertainty
as to future funding provision. From 2022 – 2026 the Strategic Equity Fund is being tapered with annual
reductions in the funding the local authority receives.
This will reduce resources available to deliver work streams related to SEF.
Internal Controls
-Strategy for Excellence and Equity 2023 – 2026 ( developed to embed improvements achieved and
support  an exit strategy from Strategic Equity Funding by 2026).
-Project management by Senior Education Officer
-Education Improvement Board chaired by Chief Education Officer
-Scrutiny by Scottish Government and Education Scotland (progress reports produced and submitted)
-WDC Improvement Framework
-Termly progress reports submitted as part of Educational Service committee reports
-Relevant Continuous Professional Development programme to support education staff
-Meetings between WDC and Education Scotland/Her Majesty's Inspectors of Education
-BGE Attainment and Performance Data
-Literacy, Numeracy and HWB Steering Group
-National Improvement Framework (NIF)
-Education Recovery Plan
Latest Note
Action plan implemented academic session 2024/25 resulting in continued strong performance; with some
evidence of attainment levels plateauing.  Action plan for academic session 2025/26 produced and included
in National Improvement Framework report submitted to Education Committee and Scottish Government in
September.
Risk Opportunity
Improved attainment - improved attendance - reduced exclusions - reduced violent incidents - reduction
requirement for targeted support over time - reduction requirement for specialist placements over time -
improved learning & community engagement - children/pupils at risk identified earlier and more effectively
- more empowered community providing self-sustaining peer support - increase in the percentage and
range of positive destinations over time - increased access to digital learning resources
Page 18

Page 19

Linked Actions Code & Title Progress Status Assigned To
ED/25-26/003 Close the attainment gap between the most and least
disadvantaged children and young people Julie McGrogan
ED/25-26/004 Improve attainment, particularly in literacy and numeracy Julie McGrogan
ED/25-26/005 Improve skills and sustained, positive school leaver
destinations for all young people Andrew Brown
SR 03 Maintaining Council
Assets that are fit for purpose
The risk that the Council's assets and facilities are not fully fit for purpose
with consequent adverse impact on our ability to deliver efficient and effective
services. Assets included in this assessment are; the Council’s property
portfolio.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
07-Aug-
2025 2 31-Mar-2027 2 Michelle Lynn
Potential Effect
- Assets are not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
- Service users require to seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions
-Council assets fail to meet relevant standards which are reported to either Scottish Government and/or
Care Inspectorate.
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of asset base and facilities -Asset user satisfaction -
Operating costs and savings
Risk Factors
- Adequacy of funding available to improve asset base
- Adequacy of staff resources allocated to the area of asset management
- Council buildings/assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts from surplus property sales
- Increase public liability claims
Internal Controls
- Corporate Asset Framework
- Learning Estate Strategy 2020-2030
- Property Asset Plan 2023-2028
- Property and Land Disposal Strategy
- Capital project meetings are carried out regularly  in addition to project specific meetings and Building
Services/Asset Management monthly meetings
- Capital Programme
- Strategic Asset Management Group
- Learning Estate Project Board
- Detailed asset database that shows relevant information on a
property by property basis in relation to operational, non-operational
- Sustainability Policy
Latest Note
The risk score remains low due to the ongoing programme of capital works.   The Property Action Plan
2023-28 approved at Infrastructure, Regeneration and Economic Development Committee February 2023
will monitor all requirements to maintain risk score.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council assets.
-Estate, assets and service delivery (e.g. new school buildings, operational building upgrades, office and
depot rationalisation projects)
- Enhance employee "feel good" factor by providing modern office accommodation equipped with up to date
IT facilities
-Improved satisfaction from public building users
- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- Prioritised Building Upgrade Plan
Linked Actions Code & Title Progress Status Assigned To
RES/25-26/007 Progress the disposal of key strategic sites Michelle Lynn
Page 19

Page 20

RES/25-26/012 Develop and implement plans and support services to
achieve the asset related savings agreed by Council Michelle Lynn
SR 004 Keeping abreast of
developments in the innovative
use of Information
Technologies
Failure to keep pace with changing technology environment
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
31-Jul-
2025 2 31-Mar-2027 2
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
Potential Effect
A lack of consistent, sufficiently robust service planning in respect of ICT arrangements is likely to result in
the Council being ill prepared to meet future demands in key service areas and lacking the capacity to
respond effectively to changing need such as increased requirement for remote working as identified during
covid pandemic.
Measures of
Impact
• Close relationship and working practices with council Asset Management Service regarding property
rationalisation.
• Implementation of mobile and flexible working, enabling a downsizing of required office accommodation
as people to work more efficiently and to adopt a more flexible policy towards office accommodation and
desk provision.  
• Number of systems that have supplier maintenance contracts. – annual process.
• Invocation of Service Business Continuity Plans and ICT Disaster Recovery plan
• Degree of compliance with security controls to prevent data loss through poor o/s patching, cyber-attack,
firewall configurations, switch replacements/upgrades etc
• Fit for purpose primary and secondary data centres
• Modern Wi-Fi technology in all council locations.
• Broadband speed in the Council area - WDC has 2nd highest broadband speeds in Scotland. 
Investigating funding options for fibre network.
• Number of ICT Service Desk incidents resolved within half day - exceeded the target and higher target
set.
• Extent of functionality development in key Council systems (i.e., lack of development beyond base
system leading to ineffective management information) – several channel shift projects delivered, and
more are in progress. PSN/Risk/challenging. Support service areas.
• Fit for purpose Council website, delivering information and services to a significant percentage of the
Council's customers.
• Provide efficient desktop services supporting laptops, Chromebooks, PCs, Thin client terminals to meet
changing workforce flexibility and property rationalisation requirements.  5-year Device replacement
programme in place.
Risk Factors
• Insufficient resourcing of ICT developments so that benefits and opportunities identified are not realised
• Lack of network security controls implemented. I. e Lack of intrusion detections alerts
• failure to respond to audit / PSN test findings and recommendations,
• insufficient resources allocated to security tasks.  However, Service redesign and ICT resources aligned to
security tasks and improved monitoring processes and tools as well as additional tools purchased to help
support remote working environment all help to mitigate this risk.
• Insufficient Service Business Continuity Plans and/or Disaster Recovery Capability.
• Lack of project and programme change management arrangements.
• Poor quality of mobile communication provision.
• Lack of uptake on channel shift.
Internal Controls
- Ongoing Capital programme established for technology refresh projects
- Information & Communication Technology (ICT) Policies such as ICT Security Framework
- Governance structures such as ICT Steering Board, Education ICT Steering Board, Digital Transformation
Board in place to support governance, integrated planning and decision making in relation to ICT
-Use of both internal IT resources from across the Council and skilled specialist consultants in key areas
- Fit for purpose primary and secondary data centres
Latest Note
August 2025
The Council continues to invest in technology and embrace innovation with the implementation of several
improvement projects. This investment is focused on delivering fit for future infrastructure, enabling a
secure, consistent and robust hybrid working experience, reducing the threat of Cyber-attack and exploring
exciting opportunities with modern technology such as Artificial Intelligence and Automation.
Page 20

Page 21

There continues to be investment in cloud services with MS SharePoint and One Drive with the pilot phase
now complete and additional corporate service areas migrating to the solution from July 25. Remaining
services areas and partners will be migrated throughout 25/26. ICT have also completed the deployment of
an Azure cloud environment to allow the Council to begin testing data and hardware resources in the cloud
and this solution also provide added resilience for system access.
The Council has procured additional 365 licences to allow the latest version of Office 365 to be deployed to
all Council devices. The ICT team are also researching latest Artificial Intelligence solution MS Co-Pilot with
the aim to trial licences across pilot groups and the solution was recently demos to employees in June. ICT
are also supporting service areas with new technology pilots i.e. AI note taking in HSCP and the ICT service
is also exploring opportunities to use Automation technology across the ICT service.
Installation of new Firewall technology took place early Jan 25 and this project not only improved internal
and external security but has also increase data capacity throughput at our data centre to allow improved
data performance across the Council network.
The SWAN (Scottish Wide Area) project to improve bandwidth capacity at all Council sites has progressed
well with 60 sites now migrated to the new network, the remaining sites including the Aurora Data Centre
will be completed by August 25. In addition, we are also upgrading the Council internet line and all of these
changes will ensure our Infrastructure is digital ready and to allow the Council to invest further in cloud and
data services.
The Councils legacy telephony system will be replaced during 25/26 with a new cloud platform solution that
will also deliver a new Council Contact Centre solution for Customer Services to enhance Citizen
communication.
ICT are also currently testing a new chat facility that will allow employees to raise ICT incidents & requests
via live chat to service desk analysts.
Risk Opportunity
-365. Provide Council employees with secure access to email and supporting systems from anywhere.
-Opportunity to redesign infrastructure and introduce new tools and security measures to support hybrid
working environments. –
- Annual network penetration tests and for PSN compliance audit
- Annual External Audit on ICT Controls
- Continued investment in ICT infrastructure and its focus on network security and resilience.
- Provide appropriate technology for employees, pupils, and service users as well as for ICT support teams
- Rationalise IT systems
- Increased use of mobile devices e.g., laptop/tablet devices and Chromebooks
- Review of device strategy and efficient/effective approach.
- Provide self-service style systems to employees and citizens
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/ICT/03 Develop and Implement next stage of Microsoft 365
roadmap
James Gallacher;
Patricia Kerr
P&T/25-26/ICT/04 Complete review of ICT devices due to be replaced
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
P&T/25-26/ICT/05 Review and explore next generation technologies
Andrew Cameron;
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
SR 05 Engaging positively with
Residents, Communities &
Partnerships
The risk that the Council fails to adequately engage, establish and maintain
positive relationships with local residents and communities in addition to
partnership bodies.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
24-Jul-
2025 6 31-Mar-2027 2 Colin Smith; Elaine
Troup
Potential Effect
Potential for tensions to develop with residents and local community groups
Reputational damage to council services
Degradation of trust in service provision A failure of strong partnerships could impact on the Councils
Page 21

Page 22

obligations under Community Empowerment Act
Measures of
Impact
Successful delivery of Local Outcome Improvement Plan (LOIP) and supporting plans positive partnership
inspections
Informed and engaged residents participating in consultation activity
Telephone survey monthly, quarterly and annual measures Increased social media engagement and reach
Risk Factors
Inability to deliver improved outcomes which require strong partnership activity
Council's reputation is adversely affected through a failed partnership arrangement
Lack of appropriate staff development / skills may be lacking to support new model of service delivery
Team restructure, post reductions and team overall budget savings challenges the viability of the team to
deliver against strategic plan and community needs.
Inequity of engagement across the partnership on key local issues
Council seen as unresponsive to community if feedback from engagement not acted upon
Apathy within communities leads to little or no engagement Some community groups feel their voices are
not being heard
Internal Controls
Robust partnership arrangements through community planning partnership
Align the Council's strategic plan with the Local Outcome Improvement Plan (LOIP)
Ensure that partners have signed up to deliver on the outcomes and targets set in the LOIP
Develop data sharing protocols with partner agencies
Participate in reform agenda as it impacts on Council area
Ensure robust mechanisms for public feedback (Embedding the Strategic Engagement Framework)
Annual budget consultation events
Citizens Panel
Open Forum questions at Council meetings
Latest Note
This risk remains unchanged despite the positive work being under-taken across the community planning
partnership. There continues to be resourcing and financial constraints that limit the number of
communities that the Communities Team can engage with.
Risk Opportunity
Position West Dunbartonshire as a modernising Council
Residents are more comfortable with the digital platform as a result of the enforced cessation of face to
face services - this presents an opportunity to modernise communication
Community Empowerment Act
Participation requests Asset transfer
Linked Actions Code & Title Progress Status Assigned To
CCF/25-26/C&D/03 Review website accessibility to ensure it complies
with regulations Jonathan Muir
CCF/25-26/C&D/05 Support upgrade to Contact Centre Telephony
Platform Lorraine Phimister
CCF/25-26/COM/01 Develop a communication plan to support budget
savings initiatives for 25/26 Lauren Crooks
CCF/25-26/LIB/03 Create a strategy document for West Dunbartonshire
Libraries Emma Eremin
CCF/25-26/LIB/04 Develop and deliver the Libraries Empower
Connections Digital Offering Emma Eremin
CCF/25-26/P&S/03 Carry out strategic engagement to support budget
consultation 2026/27 Nicola Docherty
SR 06 Challenges in protecting
the Health and Safety of
Employees and Others
Failure to meet the Council’s duty to protect the health, safety and welfare of
its employees and other people who might be affected by its business
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
12-Aug-
2025 4 31-Mar-2027 4 Alison McBride
Potential Effect
Poor health and safety culture within the organisation leading to;
Risk of an employee, service user, pupil (young person) or member of the public being seriously / fatally
injured by fault of the Council; reputational risk regarding negative publicity; financial risk in terms of
claims management compensation to the injured party; increase in insurance premiums; risk of
prosecution by the HSE resulting in a fine and/or a Council Employee being subject to criminal charges,
Page 22

Page 23

poor employee morale, high staff turnover leading to diminished service delivery.
Measures of
Impact
Resources associated with in-house/HSE investigation. Incident statistics. Service delivery impact in terms
of injury-related absence and potentially enforced cessation of work activities. Impact of injury on
employees/members of the public, legal proceedings, financial penalties, potential reputational damage and
risk of criminal charges. Hazard reporting. Actions at health and safety committees. Implementation of
Corporate health and safety plan.
Risk Factors
Lack of resources, inadequate Safety Management Standards and H&S strategy. Poor health and safety
culture. Under reporting of incidents. Blame culture. Poor communication between management and
employees. Competent advice.
Internal Controls
•Competent health and safety advice readily available from the Corporate H&S team.
•Corporate health and safety plan developed and monitored via Pentana.
•Robust health and safety management system, FIGTREE.
• Council has in place a robust H&S policy, Safety Management Standards and Fire Risk Management
Strategy that includes service specific health and safety plans, duties and responsibilities for Chief Officers,
managers and employees.
• Adequate H&S resources in place to that will allow statutory obligations in terms of the Health and Safety
at Work etc. Act and supporting legislation.
• Embedded H&S culture that discusses H&S issues at senior level and cascades throughout the
organisation through the health and safety committee system.
• Monthly reports to PMRG on organisational safety performance and issues.
•Chief Officers attend service H&S committees on a quarterly basis.
• Workplace inspection and audit programme.
• Service risk profiling.
• H&S training needs analysis for every employee group.
• The Council has in place a Trade Union Health and Safety Partnership Agreement.
• Council promotes health and safety training for TUs to diploma level.
• Hazard reporting module via FIGTREE.
• Health & safety e-learning package.
• Risk assessment working groups for service areas and review process.
Latest Note
Corporate H&S are actively reviewing and optimising key service areas, including Safety Management
Standards and training.
Work is also being carried out to refine and simplify the health surveillance process in collaboration with OH
and line managers.
The ongoing management of H & S within the Council includes facilitating management workplace
inspections as well as conducting noise monitoring, auditing, scaffold inspections and presenting training.
Fire safety management remains a priority for the Corporate H&S team. The team are conducting fire risk
assessments in line with the teams annual H&S plan. The team are also providing fire safety training to
staff within HSCP and on an ad-hoc basis to other services across the council.
The Corporate H&S team also regularly provide updates to PMRG on the status of overdue actions. In doing
this there has been a marked reduction in the overall number of overdue actions. This forum allows
Corporate H&S to have closer ties with management across the council which in turn facilitates a more
proactive approach for the management of H&S. 
No change to risk matrix.
Risk Opportunity
Demonstrate to committees, elected members, Trade Unions, employees, the community and other
external partner’s evidence of robust H&S culture. Good knowledge and awareness of health and safety
throughout all services. Positive relationship with Corporate health & safety team and all services. Reduced
incidents, costs and absence rates.
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/P&C/03 Continue to embed key Health and Safety practices. Alison McBride; Harry
McGhie
SR 07 Complexities in ensuring
an appropriately resourced and
resilient workforce
Failure to ensure that there is an appropriately resourced and resilient
workforce in place to meet future organisational needs, in effectively
executing the Council’s 2022-27 Strategic Plan.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
Page 23

Page 24

29-Jul-
2025 6 31-Mar-2027 2 Alison McBride
Potential Effect
Inability to deliver services effectively
Reduced level of service
HSCP - workforce capacity, recruitment and retention challenges; appropriate training for roles
Lack of improvement or increase in staff absences
Council underachieves as an organisation
Low staff morale
Employee conflict
Increased turnover Inability to attract/recruit
Measures of
Impact
- Access to and participation of employees in learning and
development activities
- Absence rate and trends
- Employee turnover
- Grievance, discipline and other monitoring information
- Employee  voice and associated actions
- Reports from external scrutiny bodies and award bodies - Benchmarking with appropriate comparators
Risk Factors
- Inability to attract/recruit
- Lack of appropriate development
- inadequate skills
-risk to new models of service delivery
- Lack of resource/capability to deliver - Workforce unable to adapt to change
Internal Controls
- HR processes designed to meet service delivery needs
- Develop new structures to reflect strategic priorities and aligned to Standard Operation Model (SOM)
- Align workforce plan to the Council's strategic planning processes (i.e. have the right people available at
the right time with the right skills to fulfil properly all of the Council's strategic priorities)
- Periodic review of pay arrangements in accordance with EHRC guidance (currently every 3 years)
- Incorporation of succession planning into workforce planning framework
- Identify training programmes to upskill staff
- Effective use of SWITCH to support alternative careers
- Flexible HR policies, in particular People First covering workforce planning, learning & development
(including elearning), digital/continuous improvement, employee wellbeing & engagement.
- Effective use of Occupational Health Service
- Robust Be the Best Conversations process
- Effective leadership and management behaviours, practice and programmes 
Latest Note
Workforce Planning Strategy in place for 2022-2027.
People First Strategy is in place covering 2022-2027 and this is a consolidation of a number of areas: well-
being, employee engagement, workforce planning, learning and development and digital.
WDC are recognised as leading in terms of adapting flexible working practices.
A robust package of wellbeing resources continue to be available, absence levels are closely monitored,
with personal stress and minor, ailments absences prevalent.
Trickle user numbers continue to rise and the tool is used as an additional route to ensure wider spread of
workforce communications alongside an opportunity for employees to share thoughts and ideas. In
addition, the tool is used regularly to gauge employee engagement levels.
M 365 Share point rollout continues with a second pilot about to commence. SMN in June focused around
digital capabilities and transformation opportunities. Meetings with SMTs are planned to commence in
September where discussions on how best to utilise digital leads and champions will be taken. To further
support this the digital team continue to add digital tools to the intranet page the most recent being digital
duel and a digital dilemma.
Services are currently working on structures and service delivery whilst considering the difficult financial
funding position and the impact of this will be closely supported and monitored.
There have been reductions across the people support functions and this has increased the challenges in
supporting services. It has been agreed to invest an additional resource into the digital team to support fit
for future. Fit for Future will be used to review processes, maximise digital opportunities, remove waste
and keep costs low.
Risk Opportunity - Identify previously unknown skills and talents in the workforce - Realise the potential of staff
Page 24

Page 25

Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/P&C/04 Improve employee life cycle and optimise employee
development opportunities
Louise Hastings; Lisa
MacGregor; Alison
McBride
P&T/25-26/P&C/06 Undertake a strategic review of job profiles across the
Council
Lisa MacGregor; Alison
McBride
SR 08 Threat of Cyber-attack
Data, systems and/or infrastructure are impacted as result of security attacks
which are increasing in number at a time when this threat is already placing
demands on resources to deliver increased levels of security controls.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
31-Jul-
2025 9 31-Mar-2027 4
Andrew Cameron;
James Gallacher;
Patricia Kerr
Potential Effect
• Remote working could be impacted for Council employees and partners HSCP, VJB and WDL by loss of
internet services.
• Disruption to services impacting service delivery to citizens
• Employee and Citizen data loss with the potential for misuse such as identity fraud
• Misinformation being delivered to the public via WDC communication channels
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage
• Redirection of resources to deal with the impact of an attack and away from BAU work 
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage
• Inability to provide a secure information management network for Council and partners including HSCP,
VJB and WDL.
Measures of
Impact
• Obligation to secure Cabinet Office PSN compliance certification.
• Obligation to comply with DWP MOU
• Monitor remote access usage to capacity plan
• Recorded attempts from unauthorised sources to breach council cyber defences
• Recorded cyber related incidents in the Cyber incident log
• Quantity of breaches/incidents reported to the Information Commissioners Office
• Fines levied for breaches 
Risk Factors
• Potential for attacks out of normal working hours /days
• Inappropriate Cyber defences at the perimeter of the council network and NHS interconnect network
• Inappropriate delivery of security patches to desktop, network switches and server estates
• Compliance with security standards such as PSN, PCI, Public Sector Action Plan on Cyber resilience for
Scotland • Continually changing threat landscape
• Maintaining relevant skill sets among employee group / cost of securing expert resources
• Increased targeted attacks and risks due to Remote working.
•Remote access technology may not remain fit for purpose in a Smart working environment
Internal Controls
Robust backup strategy in place on premise and cloud backup for 365 with immutable capability.
• Service Continuity Plans
• ICT Disaster Recovery Plan
• Continually review and update internal policies on patching and system hardening to ensure we keep
abreast of emerging threats and trends
• Annual PSN compliance audit including a comprehensive IT Health Check
• Governance structure in place, ICT Steering Board consisting of senior management and relevant
stakeholders meeting bi-monthly or as required in response to incidents/events
• Programme of Internal and External ICT audits
• Information Security/Data Protection forum.  Project specific forums 
• Multiple layers of Cyber defences
• Network Segregation
• Rolling programme of security awareness sessions
• Interagency and cross Council working groups and sharing.
• National Digital Office / Scottish Government Public Sector Security programme and guidance
• Continually review technologies in line with new working practices to ensure security and assurance is
integral.
• Monthly device and server patching regime.
Page 25

Page 26

Latest Note
August 25
This risk will always be high as the threat and likelihood of a Cyber Attack remains. The UK public sector is
still experiencing elevated levels of targeted Cyber-attacks including recent attacks on Scottish councils and
high-profile attacks on UK retail organisations. As this risk continues to be high the emphasis remains on
proactive measures to protect the confidentiality, integrity and availability of our data, critical
infrastructure, and overall business operations.   Key risks and continual threats include: • Demand for
emerging technologies such as Artificial Intelligence solutions present new challenges for the council to
implement and secure.
• Risk to Backup technology and corruption of council data.
• Ransomware attacks – surged in recent years, potential for significant financial loss and operational
disruption.
• Advanced Persistent Threats (APT’s) – sophisticated stealthy attacks conducted by well-resourced groups,
targets include critical infrastructure, government bodies and large corporations.
• User awareness – Phishing attempts on the rise with more sophisticated techniques being deployed
including voice and text phishing.  Targeted threats tailored to specific areas of the Council are being
observed. Social Engineering attacks now present a higher risk.
• Third Party Risks – The Council often relies on third party vendors and suppliers, increasing the risk of
cyber-attacks through the supply chain.
Mitigations:
• Continual improvement of our vulnerability/patch management systems and processes.
• Continual promotion of Cyber awareness through simulated phishing campaigns supported by our online
security training and awareness platform.
• Social Engineering guidance issued to all employees.
• Engagement with ICT Security Partners to highlight and advise on specific areas of risk.
• Continual assessment and improvement of our Cyber Security posture.
• Robust Business Continuity and Disaster Recovery plans with a new backup policy in development.
• Progress continues to take place to improve our security posture in line with the national Public Sector
Action plan (PSAP) and Public Sector Network (PSN) compliance. Vigilance of the National Cyber Security
Centre (NCSC) Cyber Security guidance continues to remain in place.
Risk Opportunity
• Increase Cyber resilience and awareness for employees, members and citizens, this can be done through
existing training and awareness platform
• Contribute to Scottish Government Public Sector Action Plan on Cyber resilience for Scotland and
potential to become involved in a national/shared security operations centre
• Upskill employees to address current and emerging threats
• Increased employee awareness across Council and partners HSCP, VJB and WDL.
Linked Actions Code & Title Progress Status Assigned To
P&T/25-26/ICT/01 Further secure the next phase of the Council’s
technology infrastructure
Andrew Cameron;
James Gallacher;
Patricia Kerr
SR 09 Challenges in delivering
effective services in relation to
Roads & Neighbourhoods
The risk that the Council’s fails to deliver on the three service areas within
Roads & Neighbourhood: Roads & Transportation, Waste & Greenspace and
Fleet. These areas provide services across a range of areas including
managing and maintaining roads, footpaths and associated infrastructure,
managing flood risk, winter gritting, grounds maintenance, street cleaning,
burial and cremation, outdoor facilities, waste and recycling, vehicle fleet
management and management. Failing to ensure these services are not fully
fit for purpose could result in adverse consequences in relation to delivering
efficient and effective services.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
07-Aug-
2025 4 31-Mar-2027 2 Gail Macfarlane
Potential Effect - Assets are not utilised in the most effective and efficient manner
Page 26

Page 27

- Service cannot be properly delivered to the satisfaction of service users
- Service users seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions
-Council assets fail to meet relevant standards
- Council projects are not delivered on time or on budget
-Failure to comply with Transport (Scotland) Act 2019 -Failure to comply with Waste (Scotland)
Regulations 2012
- Assets not fit for future and investment not sufficient to fulfil capital investment needs.
Failure to comply with Good Operator License requirements.
Increased reliance on hire vehicles should fleet investment not be adequate.
Measures of
Impact
- Condition surveys
- Defect inspection and management
- Suitability surveys
- Road Condition SPI
-Customer perceptions of service delivery
-Legionella and asbestos inspections,
- Investment levels in upkeep and improvement of asset base and facilities
-Asset user satisfaction -Operating costs and savings
-Housing adaptations not undertaken timeously
-Local Government Benchmarking Framework (LGBF)
-Association for Public Service Excellence (APSE)
-Waste Managers Network Group
Risk Factors
-Adequacy of funding available to improve asset base
- Adequacy of funding to maintain asset base ie roads at a steady state
- Adequacy of staff resources allocated to the area
- Council assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts
-Over one third of the road network is in need of repair and the current long term capital funding only
sustains a steady state condition of the road network
- Increased public liability claims due to poor condition of roads network
- Increase public liability claims due to poor condition of footpaths and roads which are not part of our
adopted network.
-buildings such as schools closed for safety if legionella etc present
-Poor customer engagement for recycling, deposit return scheme, refuse transfer station
-Financial challenges
- Budget Sensitivity Analysis (fuel costs, waste refuse disposal tonnage costs, bitumen availability and
costs)
Internal Controls
-Strategic Asset Management Group
- Corporate Asset Management Strategy (scheduled refresh in 2nd half of 2021/22 year)
- Learning Estate Strategy
- Capital Investment Team
- Capital project meetings are carried out monthly in addition to project specific meetings. 
- Capital plan
- Roads and Lighting Asset Implementation Plan
- Fleet Asset Implementation
- Open Space Asset Implementation Plan
- Sustainability Policy
-User feedback – complaints data, Citizens’ Panel and monthly telephone survey
-Fit for future service reviews
-Deposit Return Scheme
-Climate Change Strategy
-Community Empowerment Strategy
-Food Growing Strategy and Allotments
-Equality Outcomes
Latest Note No change to current scoring.  Monitoring and action plans in place to manage risk.
Risk Opportunity
-Enhance reputation of Council
-Ensure services are fit for the future and are compliant with legislation changes
-Estate, assets and service delivery (e.g. office and depot rationalisation projects, roads upgrade
programme, vehicle replacement programme, greenspace upgrade projects)
- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- The continued implementation of the energy efficient street lighting project will both improve the asset
and reduce costs significantly through reduced maintenance, energy
consumption and carbon output.
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
Linked Actions Code & Title Progress Status Assigned To
Page 27

Page 28

R&N/25-26/GS/04 Develop a new local biodiversity action plan Ian Bain
R&N/25-26/GS/05 Develop ash die back action plan – next phase Ian Bain
R&N/25-26/R&T/06 Progress phased delivery of public and fleet electric
charging points – next phase Liam Greene
R&N/25-26/R&T/10 Develop new Roads and Transport Winter Plan for
consideration at May Committee Liam Greene
SR 10 Failure to maintain
Housing Stock
The risk that Council’s Housing Stock are not fully fit for purpose with
consequent adverse impact on our ability to deliver efficient and effective
housing for Council tenants.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
13-Aug-
2025 4 31-Mar-2027 4 Alan Young
Potential Effect
- Housing stock is not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
-Increase in reactive maintenance costs/ demand/ volume
-Housing stock in poor condition
-Housing stock fail to meet relevant standards
- Non-compliance with Scottish Housing Quality Standard
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of housing stock
-User satisfaction
-Operating costs and savings
- Local Government Benchmarking Framework (LGBF)
Risk Factors
- Adequacy of funding available to improve housing stock
- Adequacy of staff resources allocated to the management of housing stock
- Housing stock deemed to be unfit for existing purpose
-Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw
material costs, impacted on supply chains, and third parties and our ability to carry out works within
budget and on time.
Internal Controls
- Housing Capital Investment Programme (refreshed and delivered annually)
- Housing Capital Improvements
- WDC Local Housing Strategy 2021-25
- The Housing Capital Investment Team
- The Planned Maintenance Section
- Housing Asset Management Strategy
- Detailed asset database that shows relevant information on a property by property basis in relation to
HRA properties.
- More Homes Better Home Project Board.
- Telephone Survey feedback
- Fit for future reviews
-Other benchmarking/ feedback
- Climate Change Strategy
Latest Note No change to risk score, programme for investment and upgrades to council housing continues into 25-26
and a further five year programme to 29-30.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council housing stock
-Estate, assets and service delivery (housing investment programme )
-Improved satisfaction from tenants
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
-Improvement of SHQS & EESSH compliance performance and points, and reduced SHQS abeyance
numbers through the strategic planning and management of housing assets.
- Increase in environmental improvements including bin stores
- Increase in internal (e.g kitchens, bathrooms, showers, special needs adaptations, central heating, smoke
detectors, windows and doors) and external updates (e.g new roof coverings, external insulated render and
Page 28

Page 29

tenement structural refurbishments)
- Increase in number of New Build Homes as part of the Strategic Housing Investment Programme (SHIP)
-Achieve energy efficiency standard for social housing
Linked Actions Code & Title Progress Status Assigned To
HS/25-26/HAI/01 Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality Standard and reduce the
number of properties held in abeyance.
Alan Young
HS/25-26/HAI/02 Ensure the Council’s Housing stock progresses towards
the achievement of the energy efficiency standard for social housing. Alan Young
SR 11 Inability to reduce
carbon footprint in line with
targets
The risk that the Council will be unable to achieve net zero emissions by
2045, both in relation to mitigating carbon emissions and adapting to the
impacts of climate change. Net zero refers to achieving an overall balance
between emissions produced and emissions taken out of the atmosphere. This
target has been developed in a way that mirrors the emission reduction
trajectory set by the Scottish Government in light of the Climate Emergency.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
24-Jul-
2025 9 31-Mar-2027 2 Elaine Troup
Potential Effect
 Failure to meet mandatory national and international policy drivers Failure to meet duties placed on
Council by The Climate Change (Scotland) Act 2009Failure to meet duties placed on Council by The
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 Failure to meet duties placed on the Council by The Heat Networks (Scotland) Act 2021 and Local Heat
and Energy Efficiency Strategies (Scotland) Order 2022.
 Failure to meet the provisions set out in Waste (Scotland) Regulations 2012 which help Scotland move
toward the objectives and targets set out in the Scotland’s Zero Waste Plan to help transition toward a
circular economy.
 Reputational damage.
 Financial burden of responding to adverse events such as extreme weather (including, but not limited
to, flooding, heat waves, wind driven storm events, etc.) resulting in action.  Impacts to Council
operations and supply chains as a result of adverse climate/extreme weather events.  This also
impacts residents, local businesses and wider infrastructure across West Dunbartonshire.
 Financial burden on WDC from increasing energy prices in light of current energy and economic crises’.
Energy Efficiency works on our own estate must increase to counteract these impacts.
Measures of
Impact
 Improving organisational resilience against the impacts of climate change.
 Improving local biodiversity through planting of native trees and bulbs in WDC
 WDC Waste Services Citizens Panel Survey regarding attitudes towards recycling improving
 The extension of the Queens Quay District Heating Network to NHS Golden Jubilee Hospital, Social
Housing, NHS Health Centre, Council buildings and further connections as per scope.
 Inspiring change through including climate change learning in staff induction, training, team meetings,
etc.
 Uptake in e-learning modules on climate change.
 Uptake in staff carrying out Sustainable Procurement assessments for tenders.
 Ensuring climate change and sustainability metrics are included in tenders for
suppliers/contractors/etc. (such as carbon reduction measures) so they are being measured for
accountability for the impacts they have on the environment
 Management of service areas setting climate change targets for their operations and staff.
 The uptake of Green Champion roles, which help normalise Climate Change and Sustainability,
practices across the Council. Uptake in sustainable travel such as walking cycling and public transport
Risk Factors
 Funding availability – delivery of actions to mitigate will require resources, capital works and
investment by the Council- e.g enhanced energy measures, and heating and renewables projects in
both domestic and non-domestic building assets
 Budget stress – notably due to energy and economic crisis, meaning it’s more difficult for Council to
set aside budget to deliver on Climate Change and Net Zero projects and actions.
 Funding approach – a combination of internal and external funding sources will be need to delivery
climate action at scale. Short term funding mechanisms such as annual payback of Council expenditure
presents difficulties for delivering long-term projects. Climate Change investments also need to take
account of whole-life costs including reduced maintenance costs and avoided Adaptation costs.
 Internal capacity – limited staff time and availability, largely due to reduced Council budgets, further
impacted by Covid19.
Page 29

Page 30

 Communication – both internally (to avoid ‘silo’ working) and externally (engaging with the public and
keeping abreast of local/national/international changes to policy).
 Economics – some technologies, materials and skills are still very expensive so innovation must
progress to enhance the viability of climate actions within the context of the Council’s budget
constraints.
 Strategy and planning – all existing and future Council plans should place responding to the climate
emergency at their core and ensure integration with other Council services.
 Legislation & Regulatory – the ability to implement some climate actions is constrained at the local
level by minimum standards and other restrictions set through legislation and national policy, for
example in relation to building regulations, planning and procurement.
 Public attitudes and behaviours - Changing behaviour of residents, businesses and  stakeholders
positively and proactively, especially where there are cost implications to the delivery of climate
actions.
Internal Controls
 Climate Change Strategy 2021-2026
 Action Plan 2021-2026
 Climate Change Action Group (CCAG)
 Pentana Risk Management System – devolved responsibilities of climate change
actions/milestones/KPI’s to service areas.
 Scottish Government – Mandatory annual Climate Change Duties Reporting
 Queens Quay District Heating Network
 Strategic Environment Assessment (SEA)
 Air quality monitoring
 Converting some Council pool fleet to Electric Vehicles (EVs).
 Climate Ready Clyde (CRC) – a cross-sector initiative funded by fifteen member organisations and
supported by the SG. Delivery of a Locale Heat & Energy Efficiency Strategy (LHEES) and delivery plan
by December 2023 – which sets out the Council’s area-based approach to reducing emissions of
heating and energy efficiency improvements to ALL assets across WD.  This includes private housing,
businesses, etc. which are not owned/operated by WDC.
 Waste infrastructure and greatly improving approach to how Council and residents reduce, reuse and
recycle waste.  Notably, taking a Circular Economy approach to waste services and implementing
appropriate infrastructure and contracts to do so.
Latest Note
The risk of non-delivery of carbon emissions targets remains significant to reflect the increasing gap
between actual and target Co2 emissions. There has been a long-term vacancy within the Climate Change
and Energy Team that continues to impact progress of the Climate Change Action Plan. The Climate
Change and Energy Team continue to work across the Council to promote active participation from all
service areas and to support a reduction of emissions.
Risk Opportunity
 Our local environment is protected, enhanced and valued resulting in:
 Our public spaces are attractive and welcoming
 Our residents feels pride in their local neighbourhood
 The percentage of household waste sent for reuse, recycling and composting has increased resulting in
reduction in the percentage that was being landfilled.
 The percentage of council land which promotes diversity of habitat and species has increased
 Our resources are used in an environmentally sustainable way
 Increase in the percentage of businesses taking action to reduce their carbon impact
 Reduction in CO2 emissions under the Council’s influence
 Reduction in West Dunbartonshire Area-Wide emissions as per requirements of the climate change
(Scotland) act
 Residents actively involved in tackling climate change and protecting the environment
 The economy and infrastructure become more low carbon and environmentally-friendly
 Our neighbourhoods are sustainable and attractive
 Increased investment in our housing stock including improving energy efficiency
 Housing developments are meeting the needs of our changing population
 The quality of neighbourhoods has improved
 Our roads and transport network are maintained and they promote safe travel routes
Linked Actions Code & Title Progress Status Assigned To
R&R/25-26/024 Co-ordinate, monitor and report the progress of the
Council’s Climate Change Action Plan for 2025/26 Elaine Troup
R&R/25-26/025 Develop the Local Heat and Energy Efficiency Strategy
Delivery Plan Elaine Troup
Risk Status
Alert
High Risk
Page 30

Page 31

Warning
OK
Unknown
Page 31

Page 32

Page 32

Page 33

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources
Audit Committee - 24 September 2025
Subject: Internal Audit Plan 2024/25 – Progress to 31 July 2025
1. Purpose
1.1 The purpose of this report is to advise Members of progress to 31 July 2025
against the Internal Audit Plan for 2024/25. 
1.2 The report also advises Members of:
 recently issued Internal Audit reports and action plans
 the status of implementation progress relating to action plans from previously
issued Internal Audit reports.
2. Recommendations
2.1 It is recommended that Members note the contents of this report.
3. Background
3.1 The annual audit plan for 2024/25 was approved by the Audit Committee on 4
December 2024.  This report provides information on the progress in
implementing the plan.
3.2 When audit reports are issued by Internal Audit, an action plan is agreed with
management in relation to issues highlighted by the audit report.  Progress on
implementing the actions is monitored by Internal Audit on a monthly basis and
reported to the Audit Committee.
4. Main Issues
4.1. The annual audit plan sets out the audit coverage for the year utilising available
staff resources to enable the Shared Service Manager – Audit & Fraud to provide
the annual internal audit opinion regarding the adequacy and effectiveness of
internal control within the Council.
4.2 In accordance with the risk-based audit methodology, for each audit, one of four
audit opinions is expressed:
Strong In our opinion there is a sound system of internal
controls designed to ensure that the organisation is
able to achieve its objectives. 
Satisfactory In our opinion isolated areas of control weakness
were identified which, whilst not systemic, put
some organisation objectives at risk. 
Item 6
Page 33

Page 34

Requires Improvement In our opinion systemic and/or material control
weaknesses were identified such that some
organisation objectives are put at significant risk.
Unsatisfactory In our opinion the control environment was
considered inadequate to ensure that the
organisation is able to achieve its objectives.
4.3 Detailed findings and recommendations reported to management are graded using
the following criteria:   
Red In our opinion the control environment is insufficient to address the
risk and this could impact the Council as a whole.
Corrective action must be taken and should start immediately.
Overseen to completion by Corporate Management Team.
Amber In our opinion there are areas of control weakness which we consider
to be individually significant but which are unlikely to affect the
Council as a whole.
Corrective action must be taken (some exceptions may be agreed
with Internal Audit) within reasonable timeframe.
Overseen to completion by Chief Officer/Head of Service.
Green In our opinion the risk area is well controlled or our audit highlighted
areas for minor control improvement and/or areas of minor control
weakness.
Process improvements/efficiencies may be actioned at management
discretion in consultation with Internal Audit.
Managed by service owner.
Not reported in Audit Committee papers.
4.4 There were no audit reviews finalised since the June 2025 Audit Committee.  This
is due to an unanticipated vacancy arising in the team which has resulted in a delay
to the completion of some audits.  These audits have been reallocated to other
members of the team to finalise and updates will be provided to the December
Audit Committee.
4.5 In relation to audit work for the Integration Joint Board, work is now complete for the
2024/25 audit plan with regular reporting to the Integration Joint Board Audit &
Performance Committee.
4.6 In relation to the Valuation Joint Board, the audit for 2024-25 is now complete.
4.7 In relation to the Leisure Trust, the audit for 2024-25 is now complete.
4.8 Internal Audit Action Plans
In relation to audit action plans, these are monitored by Internal Audit on a monthly
basis.  The status report at 30 June 2025 is provided at Appendix 2.
Ongoing Corporate Fraud Team Work
4.9 The Corporate Fraud team’s day to day work continues to focus on referrals relating
to council tax reduction/single person discounts, joint working with DWP in relation
to housing benefit and council tax reduction, referrals relating to housing tenancies
and investigating relevant national fraud initiative matches.
Page 34

Page 35

4.10 The Internal Audit Team and the Corporate Fraud Team continue to work together
as appropriate in order to ensure a joined-up approach to fraud investigation and
detection for example in relation to whistleblowing enquiries.
National Fraud Initiative
4.11 The National Fraud Initiative is a series of biennial exercises run by the Cabinet
Office and Audit Scotland to identify or prevent fraud and error by matching
electronic data held by public bodies. Participating bodies are required to
investigate data discrepancies within a set timescale and report back on any
savings.
4.12 In relation to the 2024 exercise, a significant number of matches have now been
received at 31 July 2025 in relation to a range of datasets including Housing
Benefit, Council Tax Reduction, Payroll,  Business Rates, Creditors and Blue
Badges.  Progress is as follows:
Matches
Received
Number
Investigated
No Issue Fraud (1) Error (2) Value of
Fraud/Error
9712 741 524 44 80 £79,576.25
(1) Fraud relates to CTR cases where income was not declared.  Recovery is in
progress.
(2) Errors relate to blue badges which had not been cancelled on the system
and one case where CTR was not updated in relation to a deceased case.
Benchmarking
4.13 In accordance with the Council’s Strategic Improvement Framework, the
Council’s Internal Audit service continues to be part of a benchmarking group
which involves seven other Councils.
4.14 Meetings will continue to take place during 2025 to review performance and
identify other areas for sharing of best practice.  
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 The Corporate Fraud Team activity can result in actual recoveries, charges and
re-billings.  The total amount of actual recoveries, charges and re-billings
identified from 1 April 2024 to 31 March 2025 was £123,651.
6.2 There are no procurement implications arising from this report.
Page 35

Page 36

7. Risk Analysis
7.1 There is a risk that failure to deliver the Internal Audit Plan would result in an
inability to provide a reasonable level of assurance over the Council’s system of
internal financial control to those charged with governance.  The main basis for
providing assurance is coverage of the planned risk-based audits.  Every
endeavour is made to ensure that no material slippage occurs in risk-based
audits by concentrating resources on these audits.
8. Equalities Impact Assessment (EIA)
8.1 There are no direct equalities impacts arising from the report however where an
agreed action results in a change in process this will be considered for equalities
impact by the relevant service.
9. Consultation
9.1 This report has been subject to consultation with appropriate Chief Officers.
10. Strategic Assessment
10.1 This report helps ensure strong governance and will help support delivery of the
Council Plan, and in particular priority 4: Inclusive and Adaptable, with the Council
seeking to provide high quality and adaptable services that deliver value for money.
....................................
Laurence Slavin
Chief Officer - Resources
Date: 25 August 2025
Person to Contact: Andi Priestman, Shared Service Manager – Audit & Fraud
E-mail: andi.priestman@west-dunbarton.gov.uk
Appendices: 2024/25 Annual Audit Plan – Progress to 31 July 2025
(Appendix 1)
Status of Internal Audit Action Plans at 30 June 2025 (Appendix
2)
Internal Audit Reports - Copies available on request
Wards Affected: All wards
Page 36

Page 37

2024-2025 Internal Audit Annual Audit Plan – Progress to 31 July 2025
Item 6
Appendix 1
Audit/Status Not
Started
Planning Fieldwork Fieldwork
Complete
Draft
Report
Final
Report
Date Reported to
Audit Committee
Risk-Based Reviews
Void Management      June 2025
Housing Repairs and Maintenance      June 2025
Budgetary Control 
Participatory Budgeting Deferred to future audit plan.
Corporate Procurement  
Regularity Audits
Payroll High Earners – Quarterly Review Quarterly exercise is underway.
Residential Care Homes – Overtime Not started.
Other Work
Integration Joint Board – Internal Audit Service The 2024/25 audit plan is complete.
Valuation Joint Board – Internal Audit Service The 2024/25 audit plan is complete.
Leisure Trust – Internal Audit Service The 2024/25 audit plan is complete.
National Fraud Initiative Matches for the 2024 Exercise have now been received and investigations are underway. 
Completion of 23/24 Audit Plan Audits Completed: Debt Recovery; UK Shared Prosperity Fund; Commercial Waste Income
Billing and Collection.
Page 37

Page 38

Page 38

Page 39

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLANS
AT 30 JUNE 2025
Summary: Section 1 Summary of Management Actions due for completion
by 30/6/2025
There were 32 actions due for completion by 30 June 2025,
20 actions have been reported as completed and for 12
actions, a revised completion date has been agreed.
Section 2 Summary of Current Management Actions Plans at
30/6/2025
At 30 June 2025 there were no audit reports delayed due
to management not finalising the action plan within agreed
timescales.
Section 3 Current Management Actions at 30/6/2025
At 30 June 2025 there were 38 current audit action points.
Section 4 Analysis of Missed Deadlines
At 30 June 2025 there were 13 audit action points where
the original agreed deadline has been missed.
Section 5 Summary of Action Plan Points by Audit Year
Item 6
Appendix 2
Page 39

Page 40

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
SUMMARY OF ACTION PLANS DUE FOR COMPLETION BY 30.06.2025
SECTION 1
Strategic Area
No. of
Actions
Due
No. of
Actions
Completed
Deadline
missed
Revised Date
set*
Response
outstanding*
Roads and Neighbourhood 1 1
HSCP 1 1
Education 1 1
Regulatory and Regeneration 1 1
Housing and Employability 28 17 11
Total 32 20 12
* These actions are included in the Analysis of Missed Deadlines – Section 4
Page 40

Page 41

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
SUMMARY OF CURRENT ACTION PLANS AT 30.06.2025
SECTION 2
CURRENT ACTIONS BY STRATEGIC AREA
Roads and Neighbourhood
Due for completion December 2025 1
Total Actions 1
Education
Due for completion September 2025 1
Total Actions 1
Housing & Employability
Due for completion July 2025 5
Due for completion August 2025 5
Due for completion September 2025 5
Due for completion November 2025 1
Due for completion December 2025 7
Due for completion January 2026 1
Due for completion March 2026 10
Due for completion June 2026 1
Due for completion July 2026 1
Total Actions 36
Total current actions: 38
Page 41

Page 42

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Current Internal Audit Action Plans
Supplier Management (Report Issued March 2023)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/158
HSCP Formal Contract and Supplier Management (Amber)
Development of a Contracts Register to be stored centrally and controlled by the CCQ Team.  By the
due date it will have been developed to include a risk register in RAG format to cover contract start
date, end date, extension date, CI scores, spend status, Quality monitoring information. Risk
register will also be used to programme in more to review services well ahead of contract end date.
31-Dec-2023 30-Jun-2025
HSCP Head of
Strategy and
Transformation
Chief Officer HSCP
Board
Fleet Management (Report Issued May 2023)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/176
Lack of measuring of individual vehicle efficiency/Co2 emissions (Amber)
Management will further consider reporting of Co2 emissions as part of the net zero strategy and
transition to electric vehicles.
In relation to vehicle efficiency, as fuel efficiency is affected by individual driver style, management
will consider whether driver information scores could be collated and provided to management to
prioritise or target individual training.
31-Oct-2024 30-Jun-2025
Chief Officer
Roads and
Neighbourhood
Chief Officer
Roads and
Neighbourhood
Page 42

Page 43

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
CSA Education Procedures (Report Issued May 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/231
Adequacy of School Fund Procedures
A review of the procedures will be undertaken and updated to reflect up to date practice and provide
sufficient guidance to staff involved in maintaining and managing school funds.
A copy of the updated school fund procedures will be disseminated to Heads of establishments.
31-Mar-2025 30-Sep-2025
Senior
Education
Officer
Chief Officer –
Education,
Learning and
Attainment
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/235
Procurement Awareness Training
Chief Officer, Regulatory & Regeneration is hoping to recruit to the vacant Procurement Manager
post by early June 2024.
The incoming Procurement Manager will be provided with the opportunity to agree the revised
training and guidance.
31-Aug-2024 30-Jun-2025
Chief Officer,
Regulatory &
Regeneration
Chief Officer,
Regulatory &
Regeneration
Corporate Procurement below £10k (Report Issued June 2024)
Page 43

Page 44

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
UK Shared Prosperity Fund Assurance Review (Report Issued June 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/237
Inadequate policies and procedures to support closure of the fund (Amber)
Management are in regular discussions with Government officials about continuity of UKSP Funds.
Should these discussions prove to be unsuccessful and there is no further funding from this source,
WDC has a full set of HR policies relating to staff terms and conditions and processes for dealing
with the loss of funding. We will begin to implement the appropriate course of action three months
in advance of the fund closing. 
As an update, the funding has been extended into Year 4 (25/26) and a report will be presented to
IRED Committee in February 2025 on further year funding.
31-Dec-2024 31-Dec-2025
Chief Officer
Housing &
Employability/
Chief Officer,
Resources
Chief Executive
Void Management (Report Issued May 2025)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/255
/1
Adequacy of Tenant Rechargable Repairs Process (Amber)
As part of Void working group remit conduct annual review of pre-termination process and
paperwork, unless required to be reviewed sooner.
31-Aug-2025 31-Aug-2025
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/255
/2
Adequacy of Tenant Rechargable Repairs Process (Amber)
Introduced new work code to identify clear out recharges, to allow CAS to include description when
issuing re-charge letter.
30-Jun-2025 30-Jun-2025 IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/255
/3
Adequacy of Tenant Rechargable Repairs Process (Amber)
Review recharge process to include guidance for staff to follow should previous tenant query/
dispute recharge amount invoiced for and be incorporated into Void Procedure and Recharge
processes. 30-Jun-2025 31-Aug-2025
Maintenance
Manager/
Housing
Operations
Manager
Chief Officer
Housing and
Employability
Page 44

Page 45

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/255
/4
Adequacy of Tenant Rechargable Repairs Process (Amber)
Design and implement new PowerBi clear out report. 31-Aug-2025 31-Aug-2025
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/256
/1
Adequacy of Job Costing Process (Amber)
Review how SORs labour times and QL system data is being used by supervisors to ensure effective
resource planning and implement any necessary changes to ensure and improve efficiency.
30-Jun-2025 30-Jun-2025
Maintenance
Manager
Chief Officer
Housing and
Employability
IAAP/256
/2
Adequacy of Job Costing Process (Amber)
Review the existing reporting cycle for void property estimated costs against recharge costs to
ensure these are effective and informative.
30-Jun-2025 30-Jun-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/256
/3
Adequacy of Job Costing Process (Amber)
Continue to report void management data at appropriate forums including Building Services Board. 31-Mar-2026 31-Mar-2026
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/257
/1
Lack of monitoring and authorisation of repairs costs to void properties (Amber)
Review void authorisation processes with Housing Operations and agree if further checks and
balances within empty homes management are necessary.
30-Jun-2025 30-Jun-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/257
/2
Lack of monitoring and authorisation of repairs costs to void properties (Amber)
Review in-service variation processes and identify necessary improvement actions.
30-Jun-2025 30-Jun-2025
Maintenance
Manager/IHMS
Change Officer/
Support Services
Coordinator
Chief Officer
Housing and
Employability
IAAP/257
/3
Lack of monitoring and authorisation of repairs costs to void properties (Amber)
Implement any necessary changes to the variation process and agreed authorisation processes. 31-Jul-2025 31-Jul-2025
Housing
Operations
Manager
Chief Officer
Housing and
Employability
IAAP/258
/1
Ensuring Value for Money when using external contractors (Amber)
Carry out a review of non-specialist void contractor rates and compare against the National
Schedule of Housing Rates to establish if these are comparable and provide Value for Money.
30-Jun-2025 30-Jun-2025
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/258
/2
Ensuring Value for Money when using external contractors (Amber)
Carry out analysis of the anticipated demand for non-specialist contractors for void properties
repairs in 2025/2026 and 2026/2027. 30-Jun-2025 30-Jun-2025
Maintenance
Coordinators/
Contract
Coordinator
Chief Officer
Housing and
Employability
Page 45

Page 46

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/258
/3
Ensuring Value for Money when using external contractors (Amber)
If appropriate arrange and carryout a full tender exercise to engage a void property contractor from
an existing framework or arrange an open tender exercise. 30-Nov-2025 30-Nov-2025
Contracts
Manager Chief Officer
Housing and
Employability
Housing Repairs and Maintenance (Report Issued May 2025)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/263
/1
Adequacy of Housing Client Function (Red)
Carry out a review of the Client Function to identify any areas that require improvement to ensure
quality, value for money repair and maintenance services are provided.
31-Jul-2025 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/2
Adequacy of Housing Client Function (Red)
Implement any necessary Client Function changes identified. 31-Mar-2026 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/3
Adequacy of Housing Client Function (Red)
Develop Building Services 2025/2026 improvement action plan to include appropriate financial
management, service costs recovery and budget management actions.
30-Jun-2025 31-Dec-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/4
Adequacy of Housing Client Function (Red)
Present Building Services 2025/2026 improvement action plan to the Building Service Board for
approval.
30-Jun-2025 31-Dec-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/5
Adequacy of Housing Client Function (Red)
Complete actions within Building Services 2025/2026 action plan. 31-Mar-2026 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/263
/6
Adequacy of Housing Client Function (Red)
Carry out a review of variation procedure and authorisation limits and implement any necessary
changes ensuring robust procedures are in place and provide value for money services. 30-Jun-2025 31-Dec-2025
Contracts Co-
ordinator/
Support Services
Co-ordinator
Chief Officer
Housing and
Employability
Page 46

Page 47

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/264
/5
Lack of Checking of Overtime Claims (Red)
Monitor and review revised processes to ensure effectiveness. 31-Jul-2025 31-Jul-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/265
/1
Adequacy of Stock Control Procedures (Amber)
Complete the procurement of an appropriate barcoding hardware and software solution. 30-Jun-2025 30-Jun-2026
Contracts
Manager
Chief Officer
Housing and
Employability
IAAP/265
/2
Adequacy of Stock Control Procedures (Amber)
Implement the procurement of an appropriate barcoding hardware and software solution. 31-Jul-2025 31-Jul-2026
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/265
/3
Adequacy of Stock Control Procedures (Amber)
Present a decision paper to the IHMS Project Board to approve development of the automatic
reordering module.
30-Jun-2025 31-Dec-2025
IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/265
/4
Adequacy of Stock Control Procedures (Amber)
Following approval, complete necessary work implement, test and go live on QL system. 31-Aug-2025 31-Aug-2025
IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/265
/5
Adequacy of Stock Control Procedures (Amber)
Fully implement phase 2 of the review of Building Services structure in warehouse services. 31-May-2025 01-Aug-2025
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/265
/6
Adequacy of Stock Control Procedures (Amber)
Complete regular stock takes ensuring every commodity has been counted and anomalies identified
are investigated and rectified. Provide stock valuation reports for 2024/2025. 31-May-2025 31-May-2025
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/265
/7
Adequacy of Stock Control Procedures (Amber)
Review warehouse facilities security arrangements and implement necessary changes ensuring
stock is appropriately managed and secured. 31-May-2025 31-May-2025
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/265
/8
Adequacy of Stock Control Procedures (Amber)
Develop written procedures for stores and stock control to include version control and will be
approved by the Chief Officer.
31-May-2025 31-May-2025
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
Page 47

Page 48

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/265
/9
Adequacy of Stock Control Procedures (Amber)
Training will be provided and distribution of the new procedures to all stores staff will be recorded in
a register. Staff will sign the register to confirm receipt of the procedures.
31-May-2025 30-Sep-2025
Contracts Co-
ordinator
Chief Officer
Housing and
Employability
IAAP/266
/1
Lack of Recovery Plan to reduce overspend (Amber)
Develop a cost recovery plan for 2025/2026 and gain approval of the plan from the Building
Services Board.
30-Jun-2025 31-Dec-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/266
/2
Lack of Recovery Plan to reduce overspend (Amber)
Complete actions in the cost recovery plan for 2025/2026 reporting progress at the Building
Services Board and other appropriate forums.
31-Mar-2026 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/266
/3
Lack of Recovery Plan to reduce overspend (Amber)
Drive down tenant and resident reactive repair demand in line with the criteria within the new
repairs policy.
31-Mar-2026 31-Mar-2026
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/267
/3
Adequacy of monitoring of Schedule of Rates for Specifying and Controlling Repairs &
Maintenance Work (Amber)
Implement any necessary changes identified in the variation processes.
31-Jul-2025 31-Jul-2025
Maintenance
Manager
Chief Officer
Housing and
Employability
IAAP/267
/4
Adequacy of monitoring of Schedule of Rates for Specifying and Controlling Repairs &
Maintenance Work (Amber)
Reduce the average percentage of variation on non emergency reactive repairs by 5% in 2025/2026
compared the level in 2024/2025.
31-Mar-2026 31-Mar-2026
Maintenance
Manager Chief Officer
Housing and
Employability
IAAP/268
/2
Lack of Post Inspections (Amber)
Complete fix in QL post inspection module. 30-Jun-2025 30-Jun-2025
Support Services
Co-ordinator
Chief Officer
Housing and
Employability
IAAP/268
/3
Lack of Post Inspections (Amber)
Monitor the post inspection process to ensure adherence identifying failures and review data at full
management team weekly catch up meetings.
30-Jun-2025 30-Jun-2025
Maintenance
Manager
Chief Officer
Housing and
Employability
IAAP/268
/4
Lack of Post Inspections (Amber)
Report post inspection performance to Building Services Board and other appropriate forums. 30-Jun-2025 30-Jun-2025
Building Services
Manager
Chief Officer
Housing and
Employability
Page 48

Page 49

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/268
/5
Lack of Post Inspections (Amber)
Review post inspection targets to ensure these are effective and repair standards are being met /
improved.
30-Sep-2025 30-Sep-2025
Maintenance
Manager
Chief Officer
Housing and
Employability
IAAP/269
/1
Inefficient Allocation of Resources (Amber)
Include an action in the Building Services 2025/2026 improvement action plan to have an effective
imprest stock provision in place.
30-Jun-2025 31-Dec-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/269
/2
Inefficient Allocation of Resources (Amber)
Develop alternative scheduling and appointment system to replace DRS. 31-Jul-2025 31-Jul-2025
IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/269
/3
Inefficient Allocation of Resources (Amber)
Seek approval from Building Services Board to implement new system. 31-Aug-2025 31-Aug-2025
Building Services
Manager
Chief Officer
Housing and
Employability
IAAP/269
/4
Inefficient Allocation of Resources (Amber)
Implement new scheduling and appointment system. 30-Sep-2025 30-Sep-2025
Building Services
Manager/IHMS
Change Officer
Chief Officer
Housing and
Employability
IAAP/270
/1
Lack of Risk Assessments for Staff with Secondary Employment (Amber)
Include a reminder in scheduled toolbox talks and team briefs team members require to inform
management of any secondary paid work/employment as detailed within terms and conditions of
employment.
30-Jun-2025 30-Jun-2025
Building Services
Co-ordinators Chief Officer
Housing and
Employability
IAAP/270
/2
Lack of Risk Assessments for Staff with Secondary Employment (Amber)
Review and if necessary complete risk assessments for employees that have informed management
of secondary paid work.
31-Aug-2025 31-Aug-2025
Building Services
Co-ordinators
Chief Officer
Housing and
Employability
IAAP/271
/1
Adequacy of Monitoring of Vehicle Usage (Amber)
Develop a formal fuel emission and tracking guidance procedure and rollout for use within service. 30-Sep-2025 30-Sep-2025
Contracts
Manager
Chief Officer
Housing and
Employability
IAAP/271
/2
Adequacy of Monitoring of Vehicle Usage (Amber)
Continue to monitor automated reports from webfleet system and take appropriate action in line
with Fuel Emission and Tracking Protocol and appropriate Council policies. 31-Mar-2026 31-Mar-2026
Maintenance
Manager/
Contracts
Manager
Chief Officer
Housing and
Employability
Page 49

Page 50

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 30.06.2025
SECTION 3
Status Key
On track Complete
Overdue – update required Missed original due date
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/272
/1
Completeness and Accuracy of Right First Time Performance Indicator (Amber)
Reconcile Right First Time data for year 2024/2025 and present performance information for review. 30-Jun-2025 30-Jun-2025
Building Services
Support Oficer
Chief Officer
Housing and
Employability
IAAP/272
/2
Completeness and Accuracy of Right First Time Performance Indicator (Amber)
Review performance data for accuracy. 30-Jun-2025 30-Jun-2025
IHMS Change
Officer
Chief Officer
Housing and
Employability
IAAP/273
/1
Lack of Standard Operating Procedure Manual (Amber)
Review procedure file within x-drive to identify if there are gaps in available procedures that are not
available within QL to ensure team members have appropriate guidance to effectively complete
tasks.
30-Jun-2025 30-Sep-2025
Maintenance Co-
ordinators Chief Officer
Housing and
Employability
IAAP/273
/2
Lack of Standard Operating Procedure Manual (Amber)
Develop and add any necessary procedures and processes to procedures file within the x-drive. 31-Dec-2025 31-Dec-2025
Maintenance Co-
ordinators
Chief Officer
Housing and
Employability
IAAP/274
/2
Compliance with HMRC Benefit in Kind Guidelines (Amber)
Review process for homestart personal use disclaimer protocol to ensure this is fit for purpose and
exercise is carried out annually.
31-Jul-2025 31-Jul-2025
Projects Manager Chief Officer
Housing and
Employability
IAAP/274
/3
Compliance with HMRC Benefit in Kind Guidelines (Amber)
Carry out a review of the homestart protocol with workforce, TUs and transport service ensuring
this remains fit for purpose.
31-Jan-2026 31-Jan-2026
Maintenance
Manager/Project
s Manager
Chief Officer
Housing and
Employability
IAAP/275
/2
Adequacy of Contract Monitoring (Amber)
Review the Councils’ current term contracts and identify a suitable contract/contractor that is
equipped to carry out the type of work required. Instruct team on revised process and details of the
contractor to be engaged.
30-Jun-2025 30-Jun-2025
Contracts
Manager/
Maintenance
Manager
Chief Officer
Housing and
Employability
Page 50

Page 51

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
ANALYSIS OF MISSED DEADLINES AT 30.06.2025
SECTION 4
Status Key
On track Complete
Overdue – update required Missed original due date
–new date set
Report Agreed Action Original Due
Date
Revised Date Management Comments
CSA Education
Procedures (May
2024)
Adequacy of School Fund Procedures
A review of the procedures will be undertaken and
updated to reflect up to date practice and provide
sufficient guidance to staff involved in maintaining
and managing school funds.
A copy of the updated school fund procedures will
be disseminated to Heads of establishments.
31-Mar-2025
31-May-2025
30-Jun-2025 The policy has now been drafted and will be discussed with Heads of
Establishment at the June Business Meeting.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Fully implement phase 2 of the review of Building
Services structure in warehouse services.
31-May-2025 01-Aug-2025 It has been necessary to extend completion date due to delays within
Job Evaluation in terms of reviewing the role profile of warehouse
assistant.  
Void Management
(May 2025)
Adequacy of Tenant Rechargable Repairs
Process (Amber)
Review recharge process to include guidance for
staff to follow should previous tenant
query/dispute recharge amount invoiced for and
be incorporated into Void Procedure and Recharge
processes.
30-Jun-2025 31-Aug-2025 Review is underway but deadline required to be extended.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Carry out a review of the Client Function to
identify any areas that require improvement to
ensure quality, value for money repair and
maintenance services are provided.
31-Jul-2025 31-Dec-2025 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Develop Building Services 2025/2026
improvement action plan to include appropriate
financial management, service costs recovery and
budget management actions.
30-Jun-2025 31-Dec-2025 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Page 51

Page 52

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.05.2025
SECTION 4
Status Key
On track Complete
Overdue – update required Missed original due date
Report Agreed Action Original Due
Date
Revised Date Management Comments
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Present Building Services 2025/2026 improvement
action plan to the Building Service Board for
approval.
30-Jun-2025 31-Dec-2025 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Housing Client Function (Red)
Carry out a review of variation procedure and
authorisation limits and implement any necessary
changes ensuring robust procedures are in place
and provide value for money services.
30-Jun-2025 31-Dec-2025 Client function within building services discussed at BS Board but
realistically will take another 3-6 months to embed.
Housing Repairs and
Maintenance (May
2025)
Inefficient Allocation of Resources (Amber)
Include an action in the Building Services
2025/2026 improvement action plan to have an
effective imprest stock provision in place.
30-Jun-2025 31-Dec-2025 Work is ongoing but should be in place within 3-6 months.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Complete the procurement of an appropriate
barcoding hardware and software solution.
30-Jun-2025 30-Jun-2026 In-house option being taken forward and target set for June 2026.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Present a decision paper to the IHMS Project
Board to approve development of the automatic
reordering module.
30-Jun-2025 31-Dec-2025 The process is currently being reviewed and decision paper will be
presented to Project Board by end of December 2025.
Housing Repairs and
Maintenance (May
2025)
Adequacy of Stock Control Procedures
(Amber)
Training will be provided and distribution of the
new procedures to all stores staff will be recorded
in a register. Staff will sign the register to confirm
receipt of the procedures.
31-May-2025 31-Dec-2025 Procedures have been developed and training/sign off will be completed
by end of September 2025.
Housing Repairs and
Maintenance (May
2025)
Lack of Recovery Plan to reduce overspend
(Amber)
Develop a cost recovery plan for 2025/2026 and
gain approval of the plan from the Building
Services Board.
30-06-2025 31-Dec-2025 Further work is required to undertake relevant analysis and prepare
recovery plan for approval which is now anticipated to be by 31
December 2025.
Page 52

Page 53

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.05.2025
SECTION 4
Status Key
On track Complete
Overdue – update required Missed original due date
Report Agreed Action Original Due
Date
Revised Date Management Comments
Housing Repairs and
Maintenance (May
2025)
Lack of Standard Operating Procedure
Manual (Amber)
Review procedure file within x-drive to identify if
there are gaps in available procedures that are not
available within QL to ensure team members have
appropriate guidance to effectively complete tasks.
30-06-2025 30-Sep-2025 A review of procedures in the x drive has started and will be completed
by end of September 2025.
Page 53

Page 54

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLANS
SUMMARY OF ACTIONS BY AUDIT YEAR SECTION 5
Status at 30 June 2025
Current actions by GradeAudit Year No of Agreed
Actions
No of actions
complete Red Amber Green*
2020/2021 25 25 0 0 0
2021/2022 51 50 0 0 1
2022/2023 51 48 0 0 3
2023/2024 62 48 0 2 12
2024/2025 80 31 7 29 13
Total 269 202 7 31 29
* Green actions are within the Council’s risk appetite and are therefore not included in
Audit Committee reports.
Page 54

Page 55

Audit Progress Report
West Dunbartonshire Council
August 2025
Item 7
Page 55

Page 56

Contents
1. Audit progress
2. National publications
3. FRC’s Audit Quality Inspection and Supervision Report 2025
Page 56

Page 57

01Audit progress
Page 57

Page 58

4
Audit progress
Status
High - Likely to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Medium - Potential to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Low - Not considered likely to result in a
material adjustment or a change to
disclosures in the financial statements.
Property, plant and equipment
We require confirmation of the floor area measurement for a sample of revalued buildings. Medium
Other outstanding information
Officers are working to resolve our outstanding queries in the following areas:
• Cashflow statement
• Leases
• Reserves
• Short term debtors.
Medium
Other outstanding audit work
We are completing our audit procedures in the following areas:
• Financial instruments disclosures
• Group accounts consolidation.
Medium
Audit quality control and completion procedures
Our audit work is undergoing review by the Engagement Lead, Engagement Manager and Engagement Quality Reviewer,
and further quality and compliance checks. In addition, there are residual procedures to complete, including updating
post balance sheet event considerations to the point of issuing the opinion, obtaining final management representations
and agreeing adjustments to the final set of accounts.
Medium
Annual Report and Accounts and letter of representation
We will complete our final review of the annual report and accounts upon receipt of the signed version of the accounts
and letter of representation.
Low
Purpose of this report
This report provides the Audit Committee with information about progress in delivering our responsibilities as external auditors for West Dunbartonshire Council.
2023/24 audit status
We are finalising our audit of the Council’s annual accounts for the year ended 31 March 2024. See the outstanding matters, at the time of reporting, set out below. We continue to
meet regularly with officers to discuss audit progress. We will present our Annual Audit Report to the Council meeting on 29 October 2025.
Page 58

Page 59

02National publications
Page 59

Page 60

National publications
1. Audit Scotland – Accounts Commission annual review 2024/25
The report provides a review of the work of the Accounts Commission and the auditors it appoints to work on its behalf.
Link: Our work and impact: Annual review 2024/25
2. Audit Scotland – Delivering for the future: Responding to the workforce challenge
The report highlights some of the common points identified by auditors in their Best Value thematic reports, including those councils where auditors highlighted specific examples of good
practice. The report also sets out a summary of the Accounts Commission’s overall expectations for Best Value in this area.
Link: Delivering for the future: Responding to the workforce challenge
Page 60

Page 61

03FRC’s Audit Quality Inspection and Supervision
Report 2025
Page 61

Page 62

FRC’s Audit Quality Inspection and Supervision Report 2025
Audit quality
The Financial Reporting Council’s (FRC) Audit Quality Inspection and Supervision Report 2025 on Forvis Mazars LLP was published on 15 July 2025, based on work undertaken during the
2024/25 inspection cycle, through review of a sample of our PIE and other AQR scope audits and other wider measures of audit quality such as the firm’s systems of quality management
(SoQM).
Audit quality inspections
We are pleased that this year’s AQR results reflect our significant progress in delivering audit quality,
showing a 90% profile of audits inspected as good or limited improvements required. Moreover, the
combined results of AQR inspections together with the firm’s internal file inspections of AQR-scope audits
this cycle show 86% as either good or limited improvements required. This is a testament to our team’s
commitment to audit quality and their hard work, and the effectiveness of our long-term investment in audit
quality through training, technology, leadership and a culture of continuous improvement.
We are encouraged that the FRC recognises that the firm has continued to invest in audit quality and made good
progress through our Audit Quality Transformation Plan (AQTP). The FRC also noted that the firm’s
communications remain clear and consistent around the importance of audit quality, and the firm’s new four-year
strategy and the firm’s new senior management continue to reinforce this message.
System of quality management (SoQM)
This is the first inspection cycle when ISQM (UK) has been applicable for the whole period, as 2023/24 was a
transitional cycle from the ISQC (UK) 1. We have invested considerable time and resources in developing our
SoQM and in monitoring responses, and we are pleased to see the FRC recognise this commitment. We
recognise that whilst significant improvements have been made in the last year, we continue to enhance and
develop our approach and documentation. We are in the process of addressing the findings raised this cycle –
strengthening our responses to quality risks, design assessment and monitoring activities.
Key actions
To sustain and build on our progress, we will keep working hard and putting quality first, every time. We have
strengthened our team, bringing in experienced individuals and top talent to support our success. We have taken
robust actions to address the findings and root causes and apply the positive learnings. These
include strengthening the firm’s policy on file archiving, reinforcing the guidance on group audits, and further
improving our portfolio reviews and project management. We will sustain our efforts in ensuring that our quality
plan and actions are fully embedded in our firm’s SoQM as part of ‘business as usual’ (BAU) and within the firm’s
culture.
Good practice on individual file inspections
The FRC has identified examples of good practice, including on revenue, group audits and
technical insurance provisions (including the involvement of actuarial specialists). These are
positive indications of the effectiveness of our actions to enhance quality which are now
better embedded into our firm’s SoQM. We are sharing these good practice examples with
our teams to encourage similar practices to drive consistency and enhance audit quality.
4 4 5
4
9
2
1
4 4
0
1
3
0
1 1
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2020/21 2021/22 2022/23 2023/24 2024/25
Results of inspection of individual audits
at Forvis Mazars over last five years
90%of audits
inspected by the
FRC in 2024/25
were assessed
as requiring no
more than limited
improvements
Good or limited improvements required Improvements required Significant improvements required
Commitment to audit quality
Audit quality remains a strategic priority for our firm and our people. Our commitment and key
strategic priority is to ensure the delivery of high-quality audits and to play our part in
safeguarding the public interest, restoring trust in audit and corporate governance.
Whilst we are encouraged by the improvements, we know that audit quality is not a fixed
point: sustaining the delivery of quality requires consistent focus on people, processes and
technology. We remain focused on continuous improvement and on delivering audits that
serve the public interest in the long term.
Page 62

Page 63

Contact
Forvis Mazars
Tom Reid
Director
Tom.Reid@mazars.co.uk
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is a limited
liability partnership registered in England and Wales with registered number OC308299 and with its registered office at 30 Old Bailey, London,
EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered Accountants in England and Wales. Details about our
audit registration can be viewed at www.auditregister.org.uk under reference number C001139861. VAT number: GB 839 8356 73
© Forvis Mazars 2025. All rights reserved.
Page 63

Page 64

Page 64

Page 65

West Dunbartonshire Council 
Report by the Chief Officer - Resources 
Audit Committee - 24 September 2025 
Subject: 2024/25 Treasury Management Annual Report 
1. Purpose 
1.1 The purpose of this report is to advise the Committee of the operation of the
treasury function and its activities in 2024/25 and request that the Committee
remits the report to the full Council for their approval. 
2.  Recommendations 
2.1 Committee to note the contents of the 2024/25 Annual Treasury Management
Report. 
2.2 Committee to remit the 2024/25 Annual Treasury Management Report. 
to full Council for approval. 
3. Background 
3.1 In accordance with the Treasury Policy governing the Council’s treasury
management activities the Chief Officer - Resources is required to provide an
Annual Report to Members regarding the Treasury function. 
3.2 One of the key clauses is that a responsible body is required to ensure effective
scrutiny of the treasury management strategy and polices.  Within West
Dunbartonshire Council the body identified to fulfil this role is the Audit Committee. 
4. Main Issues 
2024/25 Treasury Management Annual Report 
4.1 A copy of the 2024/25 Treasury Management Annual Report is attached (Appendix
1) with it based upon the Council’s unaudited 2024/25 Financial Statements. 
4.2 The report details the loans borrowed and repaid during the course of the year,
associated interest rates and debt rescheduling undertaken.     
4.3 External borrowing (excluding Public Private Partnership (PPP) borrowing and
leases) has increased during the year from £718.597m at the beginning of the
year to £789.860m at the end of the year. This was mainly due to capital
expenditure and the repayment of temporary loans. Over the year as new
debt has been borrowed and maturing debt replaced, the average interest
Item 8
Page 65

Page 66

rate on loans held has decreased from 4.48% at 31 March 2024 to 4.35% at
31 March 2025. 
4.4 Consideration was given to available interest rates, and mainly short-term 
borrowing has been utilised to finance the current capital programme to take
advantage of slightly lower interest rates.   
4.5 Investments have decreased as at the 31 March 2025 from £28.997m at the
beginning of the year to £13.820m at the year-end. The average interest rate
on these investments held as at 31 March 2025 decreased from 4.62% to
4.51%. 
4.6 As at 31 March 2025 fixed rate borrowing under 12 months was 39.29%. This is
below the maximum allowable limit for short term debt and is as a result of action
taken to reprofile the debt from short term to long loans. We will continue to take
action with a longer term target to bring short term borrowing toward a figure less
than 30% of the overall debt portfolio however this needs to be done prudently
whilst monitoring projected future interest rates. All other year end indicators
advised within Appendix 1 of this report are within the limits previously agreed by
Council. 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no personnel issues. 
7. Financial and Procurement Implications 
7.1 There are no financial or procurement implications. 
8. Risk Analysis 
8.1 There are three main risks associated with the formulation of prudential
indicators. These are noted below. However the Council has robust
monitoring processes in place and provides regular reports to Council and
ensures further scrutiny by elected Members at the Audit Committee: 
(a) The risk of Counterparties default (i.e. loss of principal sum invested)
however, the Council has robust controls included within its treasury
management and investment strategies that will assist in mitigating this risk. 
(b) Capital inflation may increase capital expenditure levels, which in turn may
affect the capital financing and borrowing requirement leading to an increase
in borrowing, assuming no additional capital receipts or other funding are
available.   
Page 66

Page 67

(c) Capital receipts which affect the capital financing and borrowing requirement
may not materialise which would require additional borrowing to fund the
financing requirement. 
9. Equalities Impact Assessment 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report 
11.  Consultation 
11.1 The views of Legal Services have been requested on this report and have
advised there are neither any issues nor concerns. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the 5 strategic
priorities of the Council’s Strategic Plan. 
12.2 Treasury management contributes to the Financial Strategy via the
interdependency that exists between pro-active treasury management and the
formulation of long term financial plans. 
Laurence Slavin
Chief Officer - Resources
Date: 27 August 2025 
Person to Contact:  Lynsey Dickson, 
Finance Business Partner    
Council Offices, Church Street
Email: Lynsey.Dickson@west-dunbarton.gov.uk 
Appendix: Appendix 1 - Annual Report 2024/25 -Treasury Management
and Actual Prudential Indicators 
Background Papers: Loans register and portfolio;    
Debt rescheduling schedules;
Prudential Indicators 2024/25 to 2033/34 and Treasury
Management Strategy 2024/25 to 2033/34
(Council 26 March 2025); 
Page 67

Page 68

Mid-Year Monitoring Report 2024/25 - Treasury
Management and Prudential Indicators (Council 18
December 2024); and
Treasury Management Annual Report 2023/24 (Council
18 December 2024)
Local Government Finance Circular 5/2022 - statutory
repayment of debt – short term financial flexibility:
guidance 
Wards Affected:  No wards directly affected.
Page 68

Page 69

Annual Report 2024/25
Treasury Management and Actual Prudential Indicators 
1. Introduction 
1.1 The Council’s treasury management activities are regulated by a variety of  
professional codes and statutes and guidance: 
• The Local Government in Scotland Act 2003 (the Act), provides the
powers to borrow and invest as well as providing controls and limits on
this activity.  The Act permits Scottish Ministers to set limits either on the
Council or nationally on all local authorities restricting the amount of
borrowing which may be undertaken (although no restrictions were made
in 2024/25). 
• Statutory Instrument (SSI) 29 of 2004, requires the Council to undertake
any borrowing activity with regard to the CIPFA Prudential Code for
Capital Finance in Local Authorities, and therefore operate the overall
treasury function with regard to the CIPFA Code of Practice for Treasury
Management in the Public Services; and the treasury activity with regard
to the CIPFA Code of Practice for Treasury Management in Local
Authorities. 
• Statutory Instrument (SI) 2016 No 123 requires the Council to document
its policy on the prudent repayment of loans fund advances. 
1.2 The Council has adopted the CIPFA Code of Practice for Treasury
Management in the Public Sector and the Prudential Code and operates its
treasury management service and capital programme in compliance with
these Codes and the above requirements.  These require that the prime
objective of the treasury management activity is the effective management of
risk, and that its borrowing activities are undertaken in a prudent, affordable
and sustainable basis. 
1.3 During 2024/25 the minimum reporting requirements were that the Council
should receive the following reports: 
• an annual treasury strategy in advance of the new financial year (Council  
27 March 2024)
• a mid-year treasury update report (Council 18 December 2024) 
• an annual report following the financial year-end describing the activity
compared to the strategy (this report). 
1.4  This report sets out: 
• A summary of the 2024/25 strategy.
• The Council’s treasury position at 31 March 2025.
• The main Prudential Indicators and compliance with limits.
• A summary of the economic factors affecting the strategy over 2024/25.
• The 2024/25 Treasury activity.
• Performance indicators set for 2024/25.
Item 8
Appendix 1
Page 69

Page 70

• Disclosure regarding the repayment of loan fund advances for 2024/25.
• Risk and Performance. 
2.   A Summary of the 2024/25 Strategy 
2.1 Borrowing – it is forecast that the capital borrowing need (the Capital Financing
Requirement) will be almost fully funded by external borrowing which is a mixture
of short term and long term debt. Against this background and the risk within the
economic forecast, caution will be adopted with the 2025/26 treasury operations. 
The Section 95 Officer will monitor interest rates in financial markets and adopt a
pragmatic approach to changing circumstances. 
2.2 Investments - with the economic background at the time, the investment climate
had one over-riding risk consideration - counterparty security risk.  As a result of
the underlying concerns, officers maintained an operational investment strategy
which tightened the controls already in place in the approved investment strategy. 
The Council’s investment strategy primary objectives are safeguarding the re-
payment of the principal and interest of its investments on time first and ensuring
adequate liquidity second – the investment return being a third objective. 
2.3 Based on the above, the treasury strategy was to postpone borrowing (by not
borrowing in advance of need) and in particular minimise longer term borrowing to
avoid the cost of holding higher levels of investments at higher interest rates and
to reduce counterparty risk. 
3. The Council’s Treasury Position at 31 March 2025 
3.1 During 2024/25, the Chief Officer – Resources, in line with the Treasury
Strategy, managed the debt position with the use of internal funds as well as a
mix of short-term and long-term external borrowing, and the treasury position
at 31 March 2025 compared with the previous year was: 
Table 1
Treasury position –
excluding PPP 
31 March 2024 31 March 2025 
Principal Average
Rate
Principal Average
Rate
Fixed Interest Rate Debt £718.597m 4.48% £789.860m 4.35%
Variable Interest Rate Debt £0.000m 0.00% £0.000m 0.00%
Total Debt £718.597m 4.48% £789.860m 4.35%
Total Investments £28.997m 4.62% £13.820m 4.51%
Net borrowing position £689.600m  £776.040m 
3.2  From the above table, it can be seen that the average interest rate on the debt
held as at 31 March has decreased from 4.48% in 2024 to 4.35% as at 31
March 2025.  At the same time the average rate has decreased on the
investments held as at 31 March from 4.62% in 2024 to 4.51% as at 31 March
2025. 
3.3  The external debt figure included within Table 1 includes both short term and
long term debt.   
Page 70

Page 71

3.4  There are four treasury prudential indicators which cover the activity of the
treasury function.  Complying with these indicators reduces the risk of an
adverse movement in interest rates impacting negatively on the Council’s
overall position: 
• Upper limits on variable rate exposure.
• Upper limits on fixed rate exposure.
• Maturity structures of borrowing.
• Total principal funds invested for greater than 365 days. 
3.5  Table 2 shows the actual upper limits set per debt type and maturity as at 31
March 2025.   
Table 2  
2024/25 Actual
2024/25 Revised
Indicator  
Upper Limits on Fixed Interest
Rates  100.00% 100.00%
(Against maximum position)      
Upper Limits on Variable
Interest Rates 0.00% 50.00%
(Against maximum position)       
Maturity Structure Fixed Rate Year End Max Min
Borrowing (%)      
Under 12 months 39.29% 50.00% 0%
12 months to 2 years 0.64% 50.00% 0%
2 years to 5 years 27.65% 50.00% 0%
5 years to 10 years 2.12% 50.00% 0%
10 years to 20 years 2.10% 50.00% 0%
20 years to 30 years 4.29% 50.00% 0%
30 years to 40 years 4.26% 50.00% 0%
40 years to 50 years 15.69% 100.00% 0%
50 years to 60 years 3.97% 100.00% 0%
60 years to 70 years 0.00% 100.00% 0%
Maximum Principal Funds
Invested  £0.470m £1m Nil
> 364 Days       
4. The Main Prudential Indicators and Compliance with Limits 
4.1  The Council is required by the Prudential Code to report the actual prudential
indicators after the year end. 
4.1.1  Capital Expenditure and its Financing 
This indicator shows total capital expenditure for the year and how this was
financed. The decrease in capital expenditure between revised estimate and
Page 71

Page 72

actual as noted below in Table 3 is due to expenditure which has been
reprofiled from 2024/25 into the 2025/26 capital programme, together with
resources. The indicators for 2024/25 will be revised in line with this.    
Table 3    
2024/25
2024/25 Revised
Actual Estimate*
Capital expenditure: £122.234m £124.471m
Resourced by:    
Capital receipts and grants £22.955m £26.549m
Revenue £0.051m £0.250m
Capital expenditure - additional need to
borrow for in-year capital spend     £99.228m £97.672m 
* From the Treasury Strategy Report 
4.1.2  IFRS 16 Leases 
A new accounting standard, IFRS 16 Leases has been adopted within the
Local Authority Accounting Code of Practice and is applicable to accounts for
the year ending 31 March 2025. This generally requires all leases to be
recognised on the balance sheet, which impacts both assets and other long
term liabilities. The capital element of the lease is included as obligations
under finance leases/creditors. The lease rentals comprise capital and interest
elements. The capital element is applied to reduce the outstanding obligation
and the interest element is charged to revenue on a straight-line basis over
the terms of the lease. 
It is important to note that although these technical accounting changes will
impact the CFR, they do not impact the borrowing required to finance capital
plans. 
4.1.3  Gross Borrowing and the Capital Financing Requirement (CFR) 
In order to ensure that borrowing levels are prudent, over the medium term
the Council’s gross borrowing must only be used for capital purposes.  Gross
borrowing should not therefore, except in the short term, exceed the total of
the capital financing requirement in the preceding year (2024/25) plus the
estimates of any additional capital financing requirement for the current
(2025/26) and next two financial years.  This essentially means that the
Council is not borrowing to support revenue expenditure.  This indicator
allows the Council some flexibility to borrow in advance of its immediate
capital needs in 2024/25. Table 4 shows that in 2024/25 the council was in a
temporary overborrowed position at year end due to timing differences of
repayments of borrowings taking advantage of available funds. Any
overborrowed funds were invested in line with the Treasury Strategy until
required for repayment of borrowings in early 2025/26. 
Page 72

Page 73

4.1.4 The Chief Officer Resources can confirm the Council has complied with this
indicator over the medium term (as can be seen by comparing the gross debt
figure at 31 March 2025 with the anticipated CFR at 31 March 2028 as
detailed in Table 4 below), and in the short term, the adjusted gross borrowing
position also under the CFR as at 31 March 2024.   
Table 4 
2024/25
Actual
2024/25
Revised
Indicator*
Gross borrowing position per Table1 £789.860m £823.000m
PPP Liability £82.853m £84.560m
IFRS 16 Liability £1.926m £2.462m
Adjusted gross borrowing position £874.639m £910.022m
Capital Financing Requirement  £871.164m £873.844m 
2024/25
Actual
CFR at 31 March 2025  
2024/25 Actual £871.377m
Estimated Movement in CFR*  
2025/26 £73.524m
2026/27 £76.158m
2027/28 £48.094m
Anticipated CFR at 31 March 2028 £1,084.398m
Gross Debt at 31 March 2025 £874.639m 
* Estimated movements from treasury Management Strategy 2025/26 –
March 2025 
4.1.5  The Authorised Limit 
The Authorised Limit is the “Affordable Borrowing Limit” required by Section
35 of the Local Government in Scotland Act 2003.  The Council does not have
the power to borrow above this level.  The information in Table 5
demonstrates that during 2024/25 the Council has maintained gross
borrowing within its Authorised Limit. 
4.1.6  The Operational Boundary 
The operational boundary is an indicator against which the Council monitors
its external debt position. It is based on the Council’s estimate of the most
likely (i.e. prudent but not worst case) scenario for external debt. Periods
where the actual position is either below or over the Operational Boundary are
acceptable subject to the Authorised Limit not being breached.  The
information in Table 5 demonstrates that during 2024/25 the Council has
maintained gross borrowing within its Operational Boundary. 
Page 73

Page 74

4.1.7  Actual financing costs as a proportion of net revenue stream 
This indicator shows the actual impact of capital expenditure in 2024/25
compared to the projected impact of the General Services Capital Plan
Refresh and the HRA Capital Plan Update as approved by Members on 5
March 2025. The cost of capital is described as loan charges within the
revenue budgets. 
Table 5 *  
2024/25
Revised Indicator - Authorised Limit £982.239m
Revised Indicator - Operational Boundary £900.386m
Maximum gross borrowing position during 2024/25 £801.256m
Minimum gross borrowing position during 2024/25 £696.659m 
Estimated Actual
Financing Costs as a proportion of net revenue stream    
General Fund 12.21% 7.25%
Housing (HRA) 42.68% 50.37%
* From Mid Year Report 18 December 2024 
5. Summary of the Economic Factors affecting the Strategy during 2024/25 
5.1 The Economy and Interest Rates 2024/25 – to March 2025 
(Source: Link Treasury Management Annual Report Template 2024/25
Scotland April 2025) 
UK Economy 
UK inflation has proved somewhat stubborn throughout 2024/25.  Having started the
financial year at 2.3% y/y (April), the CPI measure of inflation briefly dipped to 1.7%
y/y in September before picking up pace again in the latter months.  The latest data
shows CPI rising by 2.8% y/y (February), but there is a strong likelihood that figure
will increase to at least 3.5% by the Autumn of 2025.  
Against that backdrop, and the continued lack of progress in ending the Russian
invasion of Ukraine, as well as the potentially negative implications for global growth
as a consequence of the implementation of US tariff policies by US President Trump
in April 2025, Bank Rate reductions have been limited.  Bank Rate currently stands
at 4.5%, despite the Office for Budget Responsibility reducing its 2025 GDP forecast
for the UK economy to only 1% (previously 2% in October).
Moreover, borrowing has becoming increasingly expensive in 2024/25.  Gilt yields
rose significantly in the wake of the Chancellor’s Autumn Statement, and the
loosening of fiscal policy, and have remained elevated ever since, as dampened
growth expectations and the minimal budget contingency (<£10bn) have stoked
market fears that increased levels of borrowing will need to be funded during 2025.  
Page 74

Page 75

The table below provides a snapshot of the conundrum facing central banks: inflation
pressures remain, labour markets are still relatively tight by historical comparisons,
and central banks are also having to react to a fundamental re-ordering of economic
and defence policies by the US administration.   
UK Eurozone US
Bank Rate 4.50% 2.5% 4.25%-4.5%
GDP 0.1%q/q Q4 
(1.1%y/y)
+0.1%q/q Q4
(0.7%y/y)
2.4% Q4
Annualised
Inflation 2.8%y/y (Feb) 2.3%y/y (Feb) 2.8%y/y (Feb)
Unemployment
Rate
4.4% (Jan) 6.2% (Jan) 4.1% (Feb) 
The Bank of England sprung no surprises in their March meeting, leaving Bank Rate
unchanged at 4.5% by a vote of 8-1, but suggesting further reductions would be
gradual.  The Bank of England was always going to continue its cut-hold-cut-hold
pattern by leaving interest rates at 4.50% but, in the opposite of what happened at
the February meeting, the vote was more hawkish than expected. This suggested
that as inflation rises later in the year, the Bank cuts rates even slower, but the initial
impact of President Trump’s tariff policies in April 2025 on the financial markets
underpin our view that the Bank will eventually reduce rates to 3.50%. 
Having said that, the Bank still thinks inflation will rise from 2.8% in February to 3¾%
in Q3. And while in February it said “inflation is expected to fall back thereafter to
around the 2% target”, this time it just said it would “fall back thereafter”. That may
be a sign that the Bank is getting a bit more worried about the “persistence in
domestic wages and prices, including from second-round effects”. Accordingly,
although we expect a series of rate cuts over the next year or so, that does not
contradict the Bank taking “a gradual and careful” approach to cutting rates, but a
tepid economy will probably reduce inflation further ahead and prompt the Bank to
cut at regular intervals. 
From a fiscal perspective, the increase in businesses’ national insurance and
national minimum wage costs from April 2025 is likely to prove a headwind, although
in the near-term the Government’s efforts to provide 300,000 new homes in each
year of the current Parliament is likely to ensure building industry employees are well
remunerated, as will the clamp-down on immigration and the generally high levels of
sickness amongst the British workforce.  Currently wages continue to increase at a
rate close to 6% y/y.  The MPC would prefer a more sustainable level of c3.5%.
As for equity markets, the FTSE 100 has recently fallen back to 7,700 having hit an
all-time intra-day high 8,908 as recently as 3rd March.   The £ has also endured a
topsy-turvy time, hitting a peak of $1.34 before dropping to $1.22 in January and
then reaching $1.27 in early April 2025. 
USA Economy
Page 75

Page 76

Despite the markets willing the FOMC to repeat the rate cut medicine of 2024 (100
basis points in total), the Fed Chair, Jay Powell, has suggested that the Fed. Funds
Rate will remain anchored at 4.25%-4.5% until inflation is under control, and/or the
economy looks like it may head into recession as a consequence of President
Trump’s tariff policies.  
Inflation is close to 3% and annualised growth for Q4 2024 was 2.4%.  With
unemployment just above 4%, and tax cuts in the pipeline, the FOMC is unlikely to
be in a hurry to cut rates, at least for now.
EZ Economy
The Eurozone economy has struggled throughout 2024 and is flat lining at present,
although there is the promise of substantial expenditure on German
defence/infrastructure over the coming years, which would see a fiscal loosening. 
France has struggled against a difficult political backdrop, but with a large budget
deficit it is difficult to see any turn-around in economic hopes in the near-term.
With GDP currently below 1% in the Euro-zone, the ECB is likely to continue to cut
rates, although the headline inflation rate is still above 2% (2.3% February 2025). 
Currently at 2.5%, a further reduction in the Deposit Rate to at least 2% is highly
likely. 
5.2   Borrowing Rates in 2024/25
The graph for Public Works Loan Board (PWLB) interest rates below shows that interest
rates have continued to increase and most PWLB rates have been on a general upward
trend since May 2024. 
Source: Link Treasury Management Annual Report Template 2024/25 (Scotland)
Page 76

Page 77

6. 2024/25 Treasury Activity 
6.1  Borrowing – The Council raised new short term loans of £259.300m during
2024/25 for the replacement of naturally maturing debt and to finance the
Council’s capital programme. 
6.2  Rescheduling – No debt rescheduling has taken place in 2024/25. 
6.3  Repayment – The Council repaid naturally maturing debt of £243.000m. 
6.4  Summary of Debt Transactions – The overall position of the debt activity
resulted in the average annual interest rate paid throughout the year, year on
year decreasing from 4.48% (2023/24) to 4.35% (2024/25) 
6.5  Investment Policy – The Scottish Government issued The Local Government
Investments (Scotland) Regulations 2010 on 1 April 2010.   
6.6  The investment activity during the year conformed to the approved strategy,
and the Council had no liquidity difficulties. 
6.7  The Council’s short term cash investments decreased from £29.087m at the
beginning of the year to £13.881m at the end of the year with an average
balance of £10.693m and received an average return of 4.77% over the year. 
In addition to the short term cash investments the Council also had 2 long
term investments in Clydebank Property Company and Hub West Scotland
with a total value of £0.470m as at 31 March 2025 as identified in table 2
above (investments over 364 days).   
7. Performance Indicators set for 2024/25 
7.1  The treasury strategy defined a set of performance indicators covering the
following areas:   
7.1.1 Security - In the context of benchmarking, assessing security is a very
subjective area.  Security is currently evidenced by the application of minimum
quality criteria to financial institutions that the Council may choose to invest in,
primarily through the use of credit ratings supplied by the three main credit
rating agencies (Fitch, Moody’s and Standard & Poors).  The Council has
benchmarked security risk by assessing the historical likelihood of default for
investments placed with any institution with a long term credit rating of A- (this
is the minimum long term credit rating used in the Council’s investment
strategy).  The Council’s maximum security risk is that 0.05% of investments
placed with financial institutions could theoretically default based on global
historical data.  During the year all investments within the Council’s portfolio
were repaid on their due dates with no defaults of the principal sums
recorded. 
7.1.2 Liquidity – As required by the CIPFA Treasury Management Code of Practice
the Council has stated that it will “ensure that it has adequate, though not
excessive, cash resources, borrowing arrangements, overdrafts or standby
facilities to enable it at all times to have the level of funds available to it which
Page 77

Page 78

are necessary for the achievement of its business/service objectives”.  In
respect to liquidity as defined above the liquidity arrangements during the year
were maintained in line with the facilities and benchmarks previously set by
the Council as follows: 
o Bank overdraft - £1.000m
o Liquid short term deposits of at least £5.000m available overnight. 
7.1.3 Return – For the financial year the investment return averaged 4.770% which
is an increase of 0.201% from the previous year.  Table 6 illustrates that the
Council’s average return identified of 4.77% was less than the average return
from the Council’s bankers investment account (4.85%) and less than the
Money Market Funds rate (noted in table 6) which are the local measures of
return investment benchmarks approved in March 2012.   
The Council’s bankers (and therefore the bank with which the investment
account is held) are currently Virgin money (formerly Clydesdale Bank plc)
which falls within the Category 3 Investment Category approved in the
investment strategy approved in February 2017.  Due to the credit rating of
this bank this category specified a maximum limit £5.000m which may be held
on an overnight basis only thus limiting the ability to attract interest on this
account. 
Table 6
Benchmark Benchmar
k Return 
Average
Return
Compound 12 month SONIA* 5.09% 4.77% 
* SONIA is Sterling Overnight Index Average and has replaced LIBOR &
LIBID 
8.  Disclosure regarding the repayment of loans fund  advances for 2024/25 
8.1 The policy on the prudent repayment of loans fund advances was detailed in
the Mid-Year Monitoring Report 2024/25 - Treasury Management and
Prudential Indicators reported to Council on 18 December 2024.   
8.2 Table 7 shows the movement in the level of loan fund advances between 1
April 2024 and 31 March 2025 (excluding PPP and other leases). 
Table 7 
General
Fund  Housing
Opening Balance at 1 April 2024 £395.220m £348.200
m
New Advances in 2024/25 £8.897m £56.492m
Repayments in 2024/25 (£4.551m) (£9.502m)
Closing Balance at 31 March 2025 £399.566m £395.190
m
Page 78

Page 79

8.3 Table 8 details the anticipated repayment profile of the balance on the loans
fund advances (excluding debt interest and expenses) for both General
Services and Housing held at 31 March 2025 (note, this is not external debt). 
Table 8 
Future Repayment Profile at 31 March 2025 General Fund Housing Total
£m £m £m
Under 12 months 5.375                    11.187     16.562    
2 years to 5 years 17.054                  35.208     52.262    
6 years to 10 years 30.198                  57.559     87.757    
11 years to 15 years 32.857                  55.042     87.898    
16 years to 20 years 26.440                  58.385     84.825    
21 years to 25 years 19.157                  50.459     69.616    
26 years to 30 years 14.241                  27.448     41.689    
31 years to 35 years 12.875                  8.284       21.159    
36 years to 40 years 14.391                  7.387       21.778    
41 years to 45 years 15.330                  6.777       22.107    
46 years to 50 years 18.045                  8.518       26.563    
51 years to 55 years 23.970                  11.274     35.244    
56 years to 60 years 28.382                  7.843       36.225    
61 year + 141.252                49.819     191.071  
Total 399.566                395.190   794.756   
9.  Risk and Performance 
9.1  The Council has complied with all relevant statutory and regulatory
requirements which require the Council to identify and, where possible,
quantify the levels of risk associated with its treasury management activities. 
In particular its adoption and implementation of both the Prudential Code and
the Code of Practice for Treasury Management means both that its capital
expenditure is prudent, affordable and sustainable, and its treasury practices
demonstrate a low risk approach. Ongoing consideration of future affordability
and sustainability are reported and considered by Members each year when
setting the Council’s General Fund and HRA capital and revenue budgets. 
9.2  The Council is aware of the risks of passive management of the treasury
portfolio and, with the support of the Council’s treasury advisers, has
proactively managed its treasury position within the current economic climate
taking advantage of lower interest rates where it is deemed appropriate.  The
Council has complied with its internal and external procedural requirements.  
There is little risk of volatility of costs in the current debt portfolio as the
interest rates are predominantly fixed, with the majority of debt comprised of
long-term loans. 
9.3  Shorter-term rates and likely future movements in these rates predominantly
determine the Council’s investment return.  These returns can therefore be
volatile and, whilst the risk of loss of principal is minimised through the annual
investment strategy, accurately forecasting future returns can be difficult.
Page 79

Page 80

Page 80