Document Pack (Bookmarked with Agenda) Audit Committee - 19 February 2025

West Dunbartonshire Council · 19 February 2025
Back to Audit Committee — 19 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
Audit Committee
Date:  Wednesday, 19 February 2025 
Time:  10:00 
Venue:  Council Chambers, Clydebank Town Hall, 5 Hall Street,
Clydebank G81 1UB 
Contact: Lynn Straker, Committee Officer 
lynn.straker@west-dunbarton.gov.uk 
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Audit Committee as detailed above.
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive  
Page 1

Page 2

Distribution: 
Councillor Gordon Scanlan (Chair)
Provost Karen Murray Conaghan (Vice Chair)
Councillor Ian Dickson
Councillor Fiona Hennebry
Councillor Martin Rooney 
Councillor Clare Steel
Councillor Sophie Traynor 
All other Councillors for information 
Chief Executive
Chief Officers 
Date of issue: 6 February 2025
Page 2

Page 3

AUDIT COMMITTEE 
WEDNESDAY, 19 FEBRUARY 2025 
AGENDA 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
3 MINUTES OF PREVIOUS MEETING     
Submit for approval, as a correct record, the Minutes of Meeting of the Audit
Committee held on 4 December 2024.   
4 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
5 INTERNAL AUDIT PLAN 2024/25 – PROGRESS TO        9 - 25 
31 DECEMBER 2024   
Submit report by Chief Officer – Resources advising of progress to 31 December
2024 against the Internal Audit Plan for 2024/25. 
6 STRATEGIC RISKS 2022-2027       27 - 48 
Submit report by Chief Officer – People & Technology providing an update on the
strategic risks for 2022-2027. 
7 TREASURY MANAGEMENT MID-YEAR REPORT 2024/2025   49 - 63 
Submit report by Chief Officer – Resources providing Members with the opportunity
to further scrutinise the Prudential Indicators on treasury management to 30
September 2024. 
________________________________________________________________________
Page 3
5 - 7

Page 4

Page 4

Page 5

AUDIT COMMITTEE 
At a Meeting of the Audit Committee held in the Civic Space, 16 Church Street,
Dumbarton on Wednesday, 4 December 2024 at 2.00 p.m. 
Present: Provost Karen Murray Conaghan and Councillors Ian Dickson,
Fiona Hennebry, Martin Rooney, Gordon Scanlan, Claire Steel
and Sophie Traynor. 
Attending:  Peter Hessett, Chief Executive; Laurence Slavin, Chief Officer –
Resources; Amanda Graham, Chief Officer – Citizen, Culture
and Facilities; Andi Priestman, Shared Service Manager – Audit
and Fraud and Lynn Straker, Committee Officer. 
Apologies: Apologies for absence were intimated on behalf of Victoria
Rogers, Chief Officer – People and Technology and Julie Slavin,
Chief Finance Officer – Health and Social Care Partnership
(HSCP) and Gail Macfarlane, Chief Officer – Roads and
Neighbourhood. 
Councillor Gordon Scanlan in the Chair 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Audit Committee held on 4 September 2024 were
submitted and approved as a correct record. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
2024/25 INTERNAL AUDIT ANNUAL STRATEGY AND PLAN 
A report was submitted by the Chief Officer – Resources advising of the planned
programme of work for the Internal Audit Section for the year 2024/25. 
Item 3
Page 5

Page 6

After discussion and having heard the Shared Service Manager – Audit and Fraud in
further explanation, the Committee agreed to approve the 2024/25 Audit Plan. 
INTERNAL AUDIT PLAN 2023/24 – PROGRESS TO 6 NOVEMBER 2024 
A report was submitted by Chief Officer – Resources advising Members of progress
to 6 November 2024, against the Internal Audit Plan for 2023/24. The report also
advises Members of recently issued Internal Audit reports and action plans and of
the status of implementation progress relating to action plans from previously issued
Internal Audit reports. 
After discussion and having heard the Shared Service Manager – Audit and Fraud;
the Chief Officer – Resources and the Chief Officer – Citizen, Culture and Facilities
in further explanation and in answer to Members’ questions, the Committee agreed
to note the contents of this report. 
NATIONAL FRAUD INITIATIVE 2022/23 EXERCISE 
A report was submitted by Chief Officer – Resources informing Members of the Audit
Scotland Report “National Fraud Initiative 2022/23” published in August 2024 and to
provide an overview of the key messages and recommendations raised in the report
and how these issues are being addressed by the Council. 
After discussion and having heard the Shared Service Manager – Audit and Fraud
and the Chief Officer – Resources in further explanation and in answer to Members’
questions, the Committee agreed to note the contents of this report and agreed that
a further update report is submitted to the September 2025 Audit Committee
outlining the Council’s progress with the 2024-2025 exercise. 
PUBLIC INTEREST DISCLOSURES AND OTHER INTERNAL AUDIT
INVESTIGATIONS 27 JANUARY TO 31 OCTOBER 2024 
A report was submitted by Chief Officer – Resources advising of the outcome of
investigations into allegations and disclosures in line with public interest disclosure
and business irregularities policies, received by Internal Audit between 27 January
and 31 October 2024. 
After discussion and having heard the Service Manager – Audit and Fraud and the
Chief Officer – Resources in further explanation and in answer to Members’
questions, the Committee agreed to note the content of this report. 
2023/24 TREASURY MANAGEMENT ANNUAL REPORT 
A report was submitted by Chief Officer – Resources advising of the operation of the
treasury function and its activities in 2023/24 and requesting that the Audit
Page 6

Page 7

Committee remits the report to the full Council for their approval. After discussion
and having heard the Chief Officer – Resources in further explanation, the
Committee agreed:- 
(1) to note the contents of the 2023/24 Annual Treasury Management Report;
and 
(2) to remit the 2023/24 Annual Treasury Management Report to full Council for
approval. 
Note: Provost Karen Murray Conaghan left the meeting during consideration of this
item. 
SCOTTISH PUBLIC SERVICES OMBUDSMAN COMPLAINTS REPORT 2023-24 
A report was submitted by Chief Officer – Citizen, Culture and Facilities presenting
the Scottish Public Services Ombudsman (SPSO) report on Complaints Handling by
West Dunbartonshire Council for the year 1 April 2023 – 31 March 2024. 
After discussion and having heard the Chief Officer – Citizen, Culture and Facilities
in further explanation and in answer to Members’ questions, the Committee agreed
to note the contents of the report and the ongoing commitment at a service and
strategic level to monitor complaints and ensure compliance with Scottish Public
Services Ombudsman (SPSO) timelines. 
The meeting closed at 3.00 p.m.
Page 7

Page 8

Page 8

Page 9

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Resources
Audit Committee: 19 February 2025
Subject: Internal Audit Plan 2024/25 – Progress to 31 December 2024
1. Purpose
1.1 The purpose of this report is to advise Members of progress to 31 December
2024 against the Internal Audit Plan for 2024/25. 
1.2 The report also advises Members of:
 recently issued Internal Audit reports and action plans
 the status of implementation progress relating to action plans from previously
issued Internal Audit reports.
2. Recommendations
2.1 It is recommended that Members note the contents of this report.
3. Background
3.1 The annual audit plan for 2024/25 was approved by the Audit Committee on 4
December 2024.  This report provides information on the progress in
implementing the plan.
3.2 When audit reports are issued by Internal Audit, an action plan is agreed with
management in relation to issues highlighted by the audit report.  Progress on
implementing the actions is monitored by Internal Audit on a monthly basis and
reported to the Audit Committee.
4. Main Issues
4.1. The annual audit plan sets out the audit coverage for the year utilising available
staff resources to enable the Shared Service Manager – Audit & Fraud to provide
the annual internal audit opinion regarding the adequacy and effectiveness of
internal control within the Council.
4.2 In accordance with the risk-based audit methodology, for each audit, one of four
audit opinions is expressed:
Strong In our opinion there is a sound system of internal
controls designed to ensure that the organisation is
able to achieve its objectives. 
Satisfactory In our opinion isolated areas of control weakness
were identified which, whilst not systemic, put
some organisation objectives at risk. 
Item 5
Page 9

Page 10

Requires Improvement In our opinion systemic and/or material control
weaknesses were identified such that some
organisation objectives are put at significant risk.
Unsatisfactory In our opinion the control environment was
considered inadequate to ensure that the
organisation is able to achieve its objectives.
4.3 Detailed findings and recommendations reported to management are graded using
the following criteria:   
Red In our opinion the control environment is insufficient to address the
risk and this could impact the Council as a whole.
Corrective action must be taken and should start immediately.
Overseen to completion by Corporate Management Team.
Amber In our opinion there are areas of control weakness which we consider
to be individually significant but which are unlikely to affect the
Council as a whole.
Corrective action must be taken (some exceptions may be agreed
with Internal Audit) within reasonable timeframe.
Overseen to completion by Chief Officer/Head of Service.
Green In our opinion the risk area is well controlled or our audit highlighted
areas for minor control improvement and/or areas of minor control
weakness.
Process improvements/efficiencies may be actioned at management
discretion in consultation with Internal Audit.
Managed by service owner.
Not reported in Audit Committee papers.
4.4 There were no reviews finalised since the December 2024 Audit Committee.
4.5 In relation to audit work for the Integration Joint Board, work is underway for the
2024/25 audit plan with regular reporting to the Integration Joint Board Audit &
Performance Committee.
4.6 In relation to the Valuation Joint Board, audit planning is underway.
4.7 In relation to the Leisure Trust, audit planning has not yet started.
4.8 Internal Audit Action Plans
In relation to audit action plans, these are monitored by Internal Audit on a monthly
basis.  The status report at 31 December 2024 is provided at Appendix 2.
Ongoing Corporate Fraud Team Work
4.9 The Corporate Fraud team’s day to day work continues to focus on referrals relating
to council tax reduction/single person discounts, joint working with DWP in relation
to housing benefit and council tax reduction, referrals relating to housing tenancies
and investigating relevant national fraud initiative matches.
4.10 The Internal Audit Team and the Corporate Fraud Team continue to work together
as appropriate in order to ensure a joined-up approach to fraud investigation and
detection for example in relation to whistleblowing enquiries.
Page 10

Page 11

National Fraud Initiative
4.11 The National Fraud Initiative is a series of biennial exercises run by the Cabinet
Office and Audit Scotland to identify or prevent fraud and error by matching
electronic data held by public bodies. Participating bodies are required to
investigate data discrepancies within a set timescale and report back on any
savings.
4.12 In relation to the 2024 exercise, a number of matches have been received in
relation to a number of datasets including Housing Benefit, Council Tax Reduction,
Payroll and Blue Badges and progress is as follows:
Matches
Received
Number
Investigated
No Issue Fraud (1) Error (2) Value of
Fraud/Error
1400 142 62 1 79 £346.55
(1) Fraud relates to CTR case where income was not declared.  Recovery is in
progress.
(2) Errors relate to blue badges which had not been cancelled on the system.
Benchmarking
4.13 In accordance with the Council’s Strategic Improvement Framework, the
Council’s Internal Audit service continues to be part of a benchmarking group
which involves seven other Councils.
4.14 Meetings will continue to take place during 2025 to review performance and
identify other areas for sharing of best practice.   
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 The Corporate Fraud Team activity can result in actual recoveries, charges and
re-billings.  The total amount of actual recoveries, charges and re-billings
identified since 1 April 2024 is £108,989.
6.2 There are no procurement implications arising from this report.
7. Risk Analysis
7.1 There is a risk that failure to deliver the Internal Audit Plan would result in an
inability to provide a reasonable level of assurance over the Council’s system of
internal financial control to those charged with governance.  The main basis for
providing assurance is coverage of the planned risk-based audits.  Every
endeavour is made to ensure that no material slippage occurs in risk-based
audits by concentrating resources on these audits.
Page 11

Page 12

8. Equalities Impact Assessment (EIA)
8.1 There are no direct equalities impacts arising from the report however where an
agreed action results in a change in process this will be considered for equalities
impact by the relevant service.
9. Consultation
9.1 This report has been subject to consultation with appropriate Chief Officers.
10. Strategic Assessment
10.1 This report relates to strong corporate governance.
....................................
Laurence Slavin
Chief Officer - Resources
Date: 23 January 2025
Person to Contact: Andi Priestman, Shared Service Manager – Audit & Fraud
E-mail: andi.priestman@west-dunbarton.gov.uk
Appendices: 2024/25 Annual Audit Plan – Progress to 31 December 2024
(Appendix 1)
Status of Internal Audit Action Plans at 31 December 2024
(Appendix 2)
Internal Audit Reports - Copies available on request
Wards Affected: All wards
Page 12

Page 13

2024-2025 Internal Audit Annual Audit Plan – Progress to 31 December 2024 Appendix 1
Audit/Status Not
Started
Planning Fieldwork Fieldwork
Complete
Draft
Report
Final
Report
Date Reported to
Audit Committee
Risk-Based Reviews
Void Management   
Housing Repairs and Maintenance   
Budgetary Control 
Participatory Budgeting 
Corporate Procurement 
Regularity Audits
Payroll High Earners – Quarterly Review 2024-25 quarterly exercise is underway.
Residential Care Homes – Overtime Not started
Other Work
Integration Joint Board – Internal Audit Service The fieldwork for the 2024/25 audit plan is underway.
Valuation Joint Board – Internal Audit Service The planning for the 2024/25 audit is underway.
Leisure Trust – Internal Audit Service The planning for the 2024/25 audit has not yet started.
National Fraud Initiative Matches for the 2024 Exercise have now been received and investigations are underway. 
Completion of 23/24 Audit Plan Audits Completed: Debt Recovery; UK Shared Prosperity Fund; Commercial Waste Income
Billing and Collection.
Page 13

Page 14

Page 14

Page 15

REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLANS
AT 31 DECEMBER 2024
Summary: Section 1 Summary of Management Actions due for completion
by 31/12/2024
There were no actions due for completion by 31 December
2024.
There were two actions with a “to be advised” date which
have been reported and two actions with a completion date
not yet due which have been reported as completed by
management.  The status of all four actions has been
updated as closed  at Section 3.
Section 2 Summary of Current Management Actions Plans at
31/12/2024
At 31 December 2024 there were no audit reports delayed
due to management not finalising the action plan within
agreed timescales.
Section 3 Current Management Actions at 31/12/2024
At 31 December 2024 there were 10 current audit action
points. 
Section 4 Analysis of Missed Deadlines
At 31 December 2024 there were 5 audit action points
where the original agreed deadline has been missed.
Section 5 Summary of Action Plan Points by Audit Year
Item 5
Appendix 2
Page 15

Page 16

2
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
SUMMARY OF ACTION PLANS DUE FOR COMPLETION BY 31.12.2024
SECTION 1
Strategic Area
No. of
Actions
Due
No. of
Actions
Completed
Deadline
missed
Revised Date
set*
Deadline
missed
Revised Date
to be set*
Total
* These actions are included in the Analysis of Missed Deadlines – Section 4
Page 16

Page 17

3
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
SUMMARY OF CURRENT ACTION PLANS AT 31.12.2024
SECTION 2
CURRENT ACTIONS BY STRATEGIC AREA
Roads and Neighbourhood
Due for completion March 2025 4
Total Actions 4
HSCP - Health and Community Care
Due for completion June 2025 1
Total Actions 1
Education Learning and Attainment
Due for completion March 2025 3
Total Actions 3
Regulatory & Regeneration
Completion Date to be advised 1
Total Actions 1
Resources
Due for completion December 2025 1
Total Actions 1
Total current actions: 10
Page 17

Page 18

4
Status Key
On track Complete
Overdue – update required Missed original due date
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2024
SECTION 3
Current Internal Audit Action Plans
Supplier Management (Report Issued March 2023)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/158
HSCP Formal Contract and Supplier Management (Amber)
Development of a Contracts Register to be stored centrally and controlled by the CCQ Team.  By the
due date it will have been developed to include a risk register in RAG format to cover contract start
date, end date, extension date, CI scores, spend status, Quality monitoring information. Risk
register will also be used to programme in more to review services well ahead of contract end date.
31-Dec-2023 30-Jun-2025
HSCP Head of
Strategy and
Transformation
Chief Officer HSCP
Board
Fleet Management (Report Issued May 2023)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/176
Adequacy of Strategic Planning in relation to Fleet Management
(Amber)
An asset management plan for vehicle fleet will be developed based on the current budget for the
vehicle replacement programme.  The first plan will focus on priority vehicles which require to be
replaced and then a rolling programme will be implemented.
31-May-2024 31-Mar-2025
Chief Officer
Roads and
Neighbourhood
Chief Officer
Roads and
Neighbourhood
IAAP/178
Lack of Review and Update of Fortress System (Amber)
An initial exercise will be undertaken to review and update the driver information held on Fortress
through consultations.  Half yearly review on an ongoing basis.  Review of keys and allocation of a
key to a specific vehicle will be implemented as part of the initial exercise.
31-Dec-2023 31-Mar-2025
Chief Officer
Roads and
Neighbourhood
Chief Officer
Roads and
Neighbourhood
Page 18

Page 19

5
Status Key
On track Complete
Overdue – update required Missed original due date
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2024
SECTION 3
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/179
Lack of measuring of individual vehicle efficiency/Co2 emissions (Amber)
Management will further consider reporting of Co2 emissions as part of the net zero strategy and
transition to electric vehicles.
In relation to vehicle efficiency, as fuel efficiency is affected by individual driver style, management
will consider whether driver information scores could be collated and provided to management to
prioritise or target individual training.
31-Oct-2024 31-Mar-2025
Chief Officer
Roads and
Neighbourhood
Chief Officer
Roads and
Neighbourhood
IAAP/180
Single Person Dependency – Transport Administration (Amber)
Roles and responsibilities will be clarified and agreed for what is considered to be a service task and
what is considered to be a Corporate Admin Support task.  Relevant action to document procedures
will then be taken.
The service will consider developing the skills base of other officers within the wider service and
undertake discussion with CAS management to ensure sufficient cross-training of required skills set
within the wider CAS team.
01-Apr-2024 31-Mar-2025
Chief Officer
Roads and
Neighbourhood
Chief Officer
Roads and
Neighbourhood
Facilities Management – Cleaning Stock Control (Report Issued January 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/222
Lack of Information on Flammable/Hazardous Products (Amber)
Management will ensure an action plan is developed to include guidance for storing, handling and
recording / registering flammable/hazardous cleaning products at premises and ensure compliance
checks are carried out.
30-Sep-2024 28-Feb-2025
Facilities Officer
and Compliance
Team Leader
Chief Officer,
Citizen, Culture
and Facilities
Page 19

Page 20

6
Status Key
On track Complete
Overdue – update required Missed original due date
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2024
SECTION 3
CSA Education Procedures (Report Issued May 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/231
Adequacy of School Fund Procedures
A review of the procedures will be undertaken and updated to reflect up to date practice and provide
sufficient guidance to staff involved in maintaining and managing school funds.
A copy of the updated school fund procedures will be disseminated to Heads of establishments.
31-Mar-2025 31-Mar-2025 Senior Education
Officer
Chief Officer –
Education,
Learning and
Attainment
IAAP/232
School Fund Procedures Not Being Followed
Management will identify the tasks and processes within the current procedures which are still
applicable and remind establishments that procedures should be followed until updated procedures
are available.
31-Mar-2025 31-Mar-2025 Senior Education
Officer
Chief Officer –
Education,
Learning and
Attainment
IAAP/233
Adherence to Finance Procedures - Teacher Absence Cover
Management will ensure that all schools are using the cover spreadsheet as supplied by Finance in
order to manage and monitor their school budgets.
Arrange for additional/refresher training to Head Teachers and support staff in the correct
application of coding of absence cover where required.
Remind Head Teachers of the requirements of carrying out appropriate checks prior to the approval
of timesheets on the Teacher Booker System.
Consider running and reviewing reports from the Teacher Booker system to ensure schools are
correctly coding absence cover at least on a sample basis.
31-Mar-2025 31-Mar-2025 Senior Education
Officer
Chief Officer –
Education,
Learning and
Attainment
Page 20

Page 21

7
Status Key
On track Complete
Overdue – update required Missed original due date
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2024
SECTION 3
Corporate Procurement below £10k (Report Issued June 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/235
Procurement Awareness Training
Chief Officer, Regulatory & Regeneration is hoping to recruit to the vacant Procurement Manager
post by early June 2024.
The incoming Procurement Manager will be provided with the opportunity to agree the revised
training and guidance.
31-Aug-2024 To be advised
Chief Officer,
Regulatory &
Regeneration
Chief Officer,
Regulatory &
Regeneration
UK Shared Prosperity Fund Assurance Review (Report Issued June 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/237
Inadequate policies and procedures to support closure of the fund
Management are in regular discussions with Government officials about continuity of UKSP Funds.
Should these discussions prove to be unsuccessful and there is no further funding from this source,
WDC has a full set of HR policies relating to staff terms and conditions and processes for dealing with
the loss of funding. We will begin to implement the appropriate course of action three months in
advance of the fund closing. 
As an update, the funding has been extended into Year 4 (25/26) and a report will be presented to
IRED Committee in February 2025 on further year funding.
31-Dec-2024 31-Dec-2025
Chief Officer
Roads &
Neighbourhood/
Chief Officer,
Resources
Chief Executive
IAAP/238
Shared Prosperity Fund Data Protection Issue
Management will ensure all staff involved in submission and approval of creditor payments to be
advised that client names must not be submitted as a reference on payment requests, advising further
that initials/reference –numbers may be used as an alternative.
31-May-2024 To be advised Working4u
Manager
Chief Officer –
Roads and
Neighbourhood
IAAP/239
Financial Monitoring Review Procedures
Management will ensure, there is a formalised report introduced detailing the 20% of transactions
reviewed on a quarterly basis by the Finance Officer.
31-Aug-2024 To be advised Working4u
Manager
Chief Officer –
Roads and
Neighbourhood
Page 21

Page 22

8
Status Key
On track Complete
Overdue – update required Missed original due date
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2024
SECTION 3
Commercial Waste (Report Issued September 2024)
Code Agreed Action Status Original Due
Date Due Date Assigned To Managed By
IAAP/244
Lack of Budget Oversight – Commercial Waste Income (Amber)
Clear process is to be developed between Finance and Waste Services management for a more robust
financial control of the budget to determine the budgeted income target in advance of Council approval
at the March budget setting, Waste Service management is to be consulted, before being finalised and
the effective monitoring of the approved budget.
31-Mar-2025 31-Mar-2025 Greenspace and
Waste Manager
Chief Officer –
Roads and
Neighbourhood
Page 22

Page 23

Status Key 9
On track Complete
Overdue – update required Missed original due date
–new date set
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
ANALYSIS OF MISSED DEADLINES AT 31.12.2024
SECTION 4
Report Agreed Action Original Due
Date
Revised Date Management Comments
Supplier Management
(March 2023)
HSCP Formal Contract and Supplier
Management (Amber)
Development of a Contracts Register to be
stored centrally and controlled by the CCQ Team.
By the due date it will have been developed to
include a risk register in RAG format to cover
contract start date, end date, extension date, CI
scores, spend status, Quality monitoring
information. Risk register will also be used to
programme in more to review services well
ahead of contract end date.
31-Dec-2023
30-Sep-2024
30-Jun-2025 This works remains a key workstream for the HSCP however, a
number of challenges and additional pressures on capacity have
prevented the completion of this audit action by the due date.  It is
anticipated that the team will have concluded these other priority
workstreams to allow them to complete this work by June 2025.
Fleet Management (May
2023)
Adequacy of Strategic Planning in relation
to Fleet Management
(Amber)
An asset management plan for vehicle fleet will
be developed based on the current budget for
the vehicle replacement programme.  The first
plan will focus on priority vehicles which require
to be replaced and then a rolling programme will
be implemented.
1-Apr-2024 31-Mar-2025 This action is dependent on completion of the action plan to clarify
and agree roles and responsibilities for what is considered to be a
service task and what is considered to be a Corporate Admin Support
task.  Relevant action will then be taken.
Fleet Management (May
2023)
Single Person Dependency – Transport
Administration (Amber)
Roles and responsibilities will be clarified and
agreed for what is considered to be a service
task and what is considered to be a Corporate
Admin Support task.  Relevant action to
document procedures will then be taken.
The service will consider developing the skills
base of other officers within the wider service
and undertake discussion with CAS management
to ensure sufficient cross-training of required
skills set within the wider CAS team.
01-Apr-2024 31-Mar-2025 The service will consider developing the skills base of other officers
within the wider service and undertake discussion with CAS
management to ensure sufficient cross-training of required skills set
within the wider CAS team.
Page 23

Page 24

10
Status Key
On track Complete
Overdue – update required Missed original due date
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLAN POINTS
CURRENT ACTION PLANS AT 31.12.2024
SECTION 4
Report Agreed Action Original Due
Date
Revised Date Management Comments
Corporate Procurement
Below £10k (Report
Issued June 2024)
Procurement Awareness Training
Chief Officer, Regulatory & Regeneration is
hoping to recruit to the vacant Procurement
Manager post by early June 2024.
The incoming Procurement Manager will be
provided with the opportunity to agree the
revised training and guidance.
31-Aug-2024 To be advised The new Procurement Manager joined the Council on 16 September
and will progress the action to agree revised training and guidance.
Fleet Management
(Report Issued May 20
23)
Lack of measuring of individual vehicle
efficiency/Co2 emissions (Amber)
Management will further consider reporting of
Co2 emissions as part of the net zero strategy
and transition to electric vehicles.
In relation to vehicle efficiency, as fuel efficiency
is affected by individual driver style,
management will consider whether driver
information scores could be collated and
provided to management to prioritise or target
individual training.
31-Oct-2024 31-Mar-2025 The action completion date has been extended.
Page 24

Page 25

11
REPORT TO AUDIT COMMITTEE ON
STATUS OF INTERNAL AUDIT ACTION PLANS
SUMMARY OF ACTIONS BY AUDIT YEAR SECTION 5
Status at 31 December 2024
Current actions by GradeAudit Year No of Agreed
Actions
No of actions
complete Red Amber Green*
2020/2021 25 25 0 0 0
2021/2022 51 50 0 0 1
2022/2023 51 44 0 4 3
2023/2024 62 44 0 6 12
Total 189 163 0 10 16
* Green actions are within the Council’s risk appetite and are therefore not included in
Audit Committee reports.
Page 25

Page 26

Page 26

Page 27

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – People & Technology
Audit Committee: 19 February 2025
___________________________________________________________________
Subject: Strategic Risks 2022-2027
1. Purpose
1.1 To provide an update on the strategic risks for 2022-27.
2. Recommendations
2.1 It is recommended that the Committee note:
 The strategic risks as detailed at Appendix 1.
3. Background
3.1 The Council’s 2022 – 2027 strategic risks were agreed by the Corporate
Services and Audit Committees in November 2022. The appended risks have
been reviewed with re-assessment undertaken before being reported to this
committee. This report is submitted as agreed to Audit Committee on a bi-
annual basis.
4. Main Issues
Strategic Risk
4.1 In line with the Council’s Risk Management Framework, a re-assessment of
the Strategic Risks has taken place as detailed within Appendix 1. Each risk is
managed through internal controls, linked actions and associated milestones
with the objective being to reduce or stabilise the level of risk through
completion of linked actions over a period and/or ensure mitigation factors are
adequate should the risks actually materialise.
4.2 Table 1 represents a risk dashboard that includes information on the original,
current and target rating for each strategic risk, as well as an assessment of
the current risk status. Each strategic risk is identified and supported by more
detailed information available on a “drill-down” basis in Appendix 1.
Seven strategic risks, associated actions and milestones are met and are
progressing as expected whilst getting closer to reaching their assigned
targets. SR001, SR007, SR008, and SR011 are currently off target, which is
explained in further detail below.
Item 6
Page 27

Page 28

Table 1 Key Strategic Risk Information
Strategic Risk Original
Risk
October
2022
Current
Risk
December
2024
Target
Risk
March
2027
Risk Status
Rationale
SR 001  Significant
financial funding
reductions/limitations
from Scottish Government
SR 002  Challenges in
implementing broad-
ranging school
improvement to raise
attainment and
achievement
SR 003  Maintaining
Council Assets that are fit
for purpose
SR 004  Keeping abreast
of developments in the
innovative use of
Information Technologies
SR 005  Engaging
positively with Residents,
Communities &
Partnerships
SR 006  Challenges in
protecting the Health and
Safety of Employees and
Others
SR 007  Complexities in
ensuring an appropriately
resourced and resilient
workforce
Page 28

Page 29

SR 008 Threat of Cyber
Attack
SR 009  Challenges in
delivering effective
services in relation to
Roads & Neighbourhoods
SR 010  Failure to
maintain Housing Stock
SR 011  Inability to
reduce carbon footprint in
line with targets
Risk Methodology and Reporting
4.3 Each strategic risk is populated in Pentana in terms of the following template:
 Risk title and code;
 Description;
 Ownership;
 Potential effect;
 Measures of impact;
 Risk factors;
 Internal controls;
 Risk opportunity; and
 Linked actions.
4.4 Each risk has been scored using a “4 x 4” matrix for likelihood and impact in
relation to:
 Current risk (with review dates set at pre-determined intervals); and
 Target risk (i.e. 31 March 2027 - the duration of the Strategic Plan).
The risk descriptors used in the “4 x 4” matrix are as follows:
Page 29

Page 30

Likelihood 
Score Descriptor
1 Unlikely
2 Likely
3 Very likely
4 Certain
Impact
Score Descriptor
1 Minor
2 Moderate
3 Significant
4 Critical
4.5 For ownership, each strategic risk is “Managed By” a Chief Officer and
“Assigned To” a Senior Officer. Strategic risks are also reported on a bi-
annual basis to the Performance & Monitoring Review Group.
Service Risk
4.6 Following the methodology in 4.3 to 4.4 above, each service has owned
operational risk registers in Pentana (the Council’s performance system)
which were reviewed as part of the 2024/25 service planning process.
4.7 Significant financial funding reductions/limitations from Scottish Government
While there has been a cash increase in funding in 2025/26 this was
fundamentally due to sizable increases in revenue being raised through
taxation as part of the Autum 2024 UK Budget statement. This is not expected
to be a recurring situation and therefore the Council will continue to be faced
with significant real term funding reductions from the Scottish Government
settlement. This coincides with a period where costs are continuing to rise in
relation to social care, significant inflationary increases and continuing pay
award pressures. Whilst there are ongoing discussions between the Scottish
Government and Local Government aiming to reduce the ring fencing of
funding, the reality is that material elements of funding remain ring fenced
which significantly restricts how the Council can most effectively use the funds
made available to it.
Page 30

Page 31

4.8 Threat of Cyber Attack
This risk will always be high as the threat and likelihood of a Cyber Attack
remains. The UK public sector is still experiencing elevated levels of targeted
Cyber-attacks.
As this risk continues to be high the emphasis remains on proactive measures
to protect the confidentiality, integrity and availability of our data, critical
infrastructure, and overall business operations.
Key risks and continual threats include:
 Demand for emerging technologies such as Aritificial Intelligence solutions
present new challenges for the council to implement and secure.
 Risk to Backup technology and corruption of council data.
 Ransomware attacks – surged in recent years, potential for significant
financial loss and operational disruption.
 Advanced Persistent Threats (APT’s) – sophisticated stealthy attacks
conducted by well-resourced groups, targets include critical infrastructure,
government bodies and large corporations.
 User awareness – Phishing attempts on the rise with more sophisticated
techniques being deployed including voice and text phishing.  Targeted
threats tailored to specific areas of the Council are being observed.
 Third Party Risks – The Council often relies on third party vendors and
suppliers, increasing the risk of cyber-attacks through the supply chain.
Mitigations:
 Investment in our perimeter and internal firewall technology with enhanced
threat prevention capabilities.
 Investment in data backup technology including cloud and offsite Cyber
resilience.
 Continual improvement of our vulnerability/patch management systems
and processes.
 Continual promotion of Cyber awareness through simulated phishing
campaigns supported by our online security training and awareness
platform.
 Engagement with ICT Security Partners to highlight and advise on specific
areas of risk.
 The use of machine learning tools to baseline “normal” on our systems
and highlight any deviation from this which could indicate potential
compromise.
 Improving Email security with enhanced Phishing/Spam identification.
 Improved and more secure remote access solution now implemented.
 Implementing stricter access controls with zero trust technology and
policies.
 Continual assessment of our Cyber Security posture.
 Risk Assessments such as Incident Response Readiness review, Security
Gap Analysis, DPIA and regular audits.
Page 31

Page 32

 Creation of dedicated Cyber Security team and providing industry standard
training.
 Robust Business Continuity and Disaster Recovery plans with a new
backup policy in development.
Progress continues to take place to improve our security posture in line with
the national Public Sector Action plan (PSAP) and Public Sector Network
(PSN) compliance. Vigilance of the National Cyber Security Centre (NCSC)
Cyber Security guidance continues to remain in place.
The cyber security landscape continues to evolve rapidly requiring ICT to
adopt proactive measures to protect our assets and maintain business
continuity. By understanding the current threat landscape, complying with
relevant regulations and guidelines, managing third party risks, and
establishing robust incident response and business continuity plans the
Council is reducing our exposure to cyber security risks and building a
resilient cyber security posture.
4.9 Complexities in ensuring an appropriately resourced and resilient workforce
The risk rating remains scored at a 6. The difficult funding position means an
impact on an appropriately resourced and resilient workforce is expected
however the severity of this remains unclear. Services are reviewing
structures and service delivery models in light of the council's financial
challenges.
The Workforce Planning Strategy is in place for 2022-2027. Additionally, the
People First Strategy covers the same period and consolidates several areas:
well-being, employee engagement, workforce planning, learning and
development and digital. A robust package of wellbeing resources continues
to be available, the council is recognised as a leading employer in terms of
adapting flexible working practices, attendance levels are closely monitored,
with personal stress and minor ailment absences currently prevalent.
Digital Skills approach has been refreshed with a matrix cascade planned
across the organisation to support 365 Share point rollout utilising digital leads
and champions. To further support this the digital team have completed a
programme over the last year focusing on digital skills, improving the use of
data and maximising 365 tools. The council wide rollout to SharePoint
continues with employees being supported on the opportunities this software
can provide.
4.10 Inability to reduce carbon footprint in line with targets
The risk of non-delivery of carbon emissions targets remains as moderate.
Progress is being made through the delivery of the Climate Change Action
Plan; however, pace of delivery has been, and will continue to be, impeded
due to lack of internal resource and additional funding to deliver.
Page 32

Page 33

5. People Implications
5.1 There are no people implications associated with this report, other than in
relation to the mitigation of risk.
6. Financial and Procurement Implications
6.1 There are no financial and/or procurement implications directly associated
with this report however there are in relation to any expenditure linked to
mitigation.
7. Risk Analysis
7.1 Failure to ensure robust risk management is likely to result in the Council
being criticised by External Auditors for not having an integrated approach to
embedding risk management within the authority with the result that a “no
scrutiny required” status would not be achieved.
7.2 Progressing with a robust risk management approach will demonstrate that
the Council is taking ownership of risk management and ensuring effective
measures are in place. The ability to demonstrate risk ownership should
benefit the Council in terms of:
 Understanding risk and its potential impact on the Council’s priorities and
objectives;
 Reducing insurance premiums going forward by recognising that a mature
approach to risk management will contribute to a reduction in the number
and value of claims across a range of insurance classifications;
 Contributing towards incident prevention based upon post-incident
investigation;
 Meeting statutory/regulatory requirements; and
Ensuring better partnership working with external and internal partners.
8. Equalities Impact Assessment (EIA)
8.1 EIA 548 notes the positive impacts of an approach to risk that integrates
considerations on equalities, human rights health and social and economic
impacts that is aligned with the content of the new Strategic Plan.
9. Consultation
9.1 The strategic risks have been discussed with the Chief Officers and senior
management. The reports to committee are available to the Trades Union and
consultation undertaken as required.
9.2 The strategic risks have been cross checked with WD HSCP. This ensures
that issues affecting HSCP are reflected within the wider council strategic risk
report.
Page 33

Page 34

10. Strategic Assessment
10.1 At its meeting on 26 October 2022, the Council agreed that its five main
strategic priorities for 2022 - 2027 are as follows:
 Our Communities - Resilient and Thriving
 Our Environment - A Greener Future
 Our Economy - Strong and Flourishing
 Our Council - Inclusive & Adaptable
10.2 The strategic risks have been identified to complement and underpin all
strategic priorities.
Name:   Victoria Rogers
Designation:   Chief Officer People & Technology
Date:   3rd February 2025
Person to Contact: Harry McGhie, Risk & Health and Safety Officer
Harry.McGhie@west-dunbarton.gov.uk
Appendices: Appendix 1: Detailed Strategic Risk List
Background Papers: West Dunbartonshire Council Strategic Plan 2022-2027
Risk Management Framework
EIA screening
Page 34

Page 35

Strategic Risk Report
Generated on: 03 February 2025
SR 01 Significant financial
funding reductions /
limitations from Scottish
Government
It is expected that the Council will continue to be faced with significant real
term funding reductions from the Scottish Government settlement. This is
based on local government settlements in recent years and an ongoing
narrative about limited funds available to support public services. This
coincides with a period where costs and demographic pressures are
continuing to rise in relation to social care, significant inflationary increases,
the impact of increases in the bank interest rate on the cost of borrowing and
pay award pressures linked to inflation. Whilst there are ongoing discussions
between the Scottish Government and Local Government on reducing the ring
fencing of funding is the reality is that material elements of funding remains
ring fenced which significantly restricts how the Council can most effectively
use the funds made available to it.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
12-Dec-
2024 16 31-Mar-2027 4 Laurence Slavin
Potential Effect
Shortfall in finances resulting in  the Council being unable to provide all services as intended and needing
to identify further cuts to services to deliver a balanced budget. This extends to those services delegated
by the Council to the Health and Social Care (HSCP) Board.
Measures of
Impact
- Reduction in government grant
- Demographic change (population decline/growth, aging population)
- Cost reduction required including reducing level and/or quality of service provision
- Increased Debt (collection of Council Tax, HRA rents, etc)
-Depletion of reserves
Risk Factors
- Insufficient funding from Scottish Government to retain essential services and to fully fund policy
commitments.
- Lack of time to plan for changes in the level of grant funding due to single year settlements and late
settlement information from Scottish Government
- General inflationary factors
- Bank of England Base Rate increases
- Significant additional cost pressures, driven by demographic profile.
- Insufficient capital receipts to cover loan repayments (creating a revenue pressure)
Internal Controls
- Long Term Financial Strategy
- Regular Financial Updates to Council
- Monitor and maintain General Services and Housing Revenue Account prudential targets
- Reporting and monitoring of Treasury Management Strategy
- Budgetary control process
- Regular budgetary control and savings monitoring reports provided to CMT and Council / committees
- Active engagement with HSCP Chief Officer on financial performance and budget planning
- Vacancy Control measures
- Rigorous debt collection processes
- Annual Internal Audit Plan
- Work of External Auditors (external control)
- Annual Governance Statement
Latest Note
Assumptions on future Scottish Government funding and other material budget assumptions are updated
regularly and reported to Council periodically throughout the year. It is expected that future Scottish
Government funding will be insufficient to pay for current levels of service delivery. Furthermore, it is
expected that future local government settlements will be a real terms reduction in local government
funding, including those services delegated to the HSCP Board.
Risk Opportunity
-Significant council projects focusing on long term economic development in the West Dunbartonshire area
to grow the local economy and generate revenue
- Annual exercise to identify efficiencies
- Projects to implement new ways of working (e.g. digitisation, automation, asset management)
Item 6
Appendix 1
Page 35

Page 36

Linked Actions Code & Title Progress Status Assigned To
RES/24-25/001 Review ways of decreasing corporate debt through
continued improvements to debt collection processes in relation to
sundry, NDR, Council Tax and rent
Ryan Chalmers
RES/24-25/002 Review ways to improve rent collection rates in
conjunction with Housing and W4U Ryan Chalmers
SR 02 Challenges in
implementing broad-ranging
school improvement to raise
attainment and achievement
This risk concerns delivering excellence and equity for children and young
people. National and local indicators have been set to monitor progress with
outcomes relating to attainment and achievement with a key focus on making
progress to narrow the poverty related attainment gap.
Scottish Equity funding devolved to local authorities aims to deliver on
priorities between 2023-26. This funding will end in 2026.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
17-Dec-
2024 4 31-Mar-2027 2 Julie McGrogan
Potential Effect
Improved outcomes for young people would not be attained and achieved.
The Council would fail to meet the needs of individual learners particularly those children and young people
most disadvantaged by poverty.
Risk of reputational damage to the service and the wider Council if outcomes and targets not as education
as a statutory service is subject to close scrutiny of local authority performance with outcomes for children
and young people by the local community and by the national agencies.   
Measures of
Impact
Stretch Aims and Targets for attainment and achievement 3-18 et to be achieved by 2026. The Stretch
Aims  are scrutinised annually by Scottish Government and Education Scotland.
West Dunbartonshire Performance Targets for attainment and narrowing the poverty related attainment
gap in Early Years, Broad General Education and Senior Phase
West Dunbartonshire Improvement Board Quality Indicator Evaluations
National Qualifications Attainment and Achievement Results
Broad General Education Achievement of  Level Results
West Dunbartonshire Scottish National Standardised Assessment Data
Positive Destination Data
West Partnership Attainment , Equity and Destination Performance Measures
Her Majesty’s Inspectors of Education inspection reports
Stakeholder Feedback
Risk Factors
Reduced funding 2022 -2026; no confirmation of future funding from 2026:
This Strategic Priority  has been supported by Scottish Government Attainment Challenge Funding since
2015 and since 2022 Strategic Equity Funding. Also, schools in West Dunbartonshire have received Pupil
Equity Funding since 2016. The national funding streams are committed to until 2026 – there is uncertainty
as to future funding provision. From 2022 – 2026 the Strategic Equity Fund is being tapered with annual
reductions in the funding the local authority receives.
This will reduce resources available to deliver work streams related to SEF.
Internal Controls
-Strategy for Excellence and Equity 2023 – 2026 ( developed to embed improvements achieved and
support  an exit strategy from Strategic Equity Funding by 2026).
-Project management by Senior Education Officer
-Education Improvement Board chaired by Chief Education Officer
-Scrutiny by Scottish Government and Education Scotland (progress reports produced and submitted)
-WDC Improvement Framework
-Termly progress reports submitted as part of Educational Service committee reports
-Relevant Continuous Professional Development programme to support education staff
-Meetings between WDC and Education Scotland/Her Majesty's Inspectors of Education
-BGE Attainment and Performance Data
-Literacy, Numeracy and HWB Steering Group
-National Improvement Framework (NIF)
-Education Recovery Plan
Latest Note
An improvement action plan has been implemented in all schools and ELC since August 2024 focusing on
school attainment / equity performance and focused improvement actions implemented to build on our
improving performance.
Page 36

Page 37

Risk Opportunity
Improved attainment - improved attendance - reduced exclusions - reduced violent incidents - reduction
requirement for targeted support over time - reduction requirement for specialist placements over time -
improved learning & community engagement - children/pupils at risk identified earlier and more effectively
- more empowered community providing self-sustaining peer support - increase in the percentage and
range of positive destinations over time - increased access to digital learning resources
Linked Actions Code & Title Progress Status Assigned To
ELA/23-24/003 Narrow the attainment gap between the most and least
disadvantaged children and young people Julie McGrogan
ELA/23-24/004 Improve skills and sustained, positive school leaver
destinations for all young people Andrew Brown
ELA/23-24/005 Improve attainment, particularly in literacy and numeracy Julie McGrogan
SR 03 Maintaining Council
Assets that are fit for purpose
The risk that the Council's assets and facilities are not fully fit for purpose
with consequent adverse impact on our ability to deliver efficient and effective
services. Assets included in this assessment are; the Council’s property
portfolio.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
04-Dec-
2024 2 31-Mar-2027 2 Michelle Lynn
Potential Effect
- Assets are not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
- Service users require to seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions
-Council assets fail to meet relevant standards which are reported to either Scottish Government and/or
Care Inspectorate.
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of asset base and facilities -Asset user satisfaction -
Operating costs and savings
Risk Factors
- Adequacy of funding available to improve asset base
- Adequacy of staff resources allocated to the area of asset management
- Council buildings/assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts from surplus property sales
- Increase public liability claims
Internal Controls
- Corporate Asset Framework
- Learning Estate Strategy 2020-2030
- Property Asset Plan 2023-2028
- Property and Land Disposal Strategy
- Capital project meetings are carried out regularly  in addition to project specific meetings and Building
Services/Asset Management monthly meetings
- Capital Programme
- Strategic Asset Management Group
- Learning Estate Project Board
- Detailed asset database that shows relevant information on a
property by property basis in relation to operational, non-operational
- Sustainability Policy
Latest Note The risk score continues to remain low due to the ongoing capital programme of works.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council assets.
-Estate, assets and service delivery (e.g. new school buildings, operational building upgrades, office and
depot rationalisation projects)
- Enhance employee "feel good" factor by providing modern office accommodation equipped with up to
date IT facilities
-Improved satisfaction from public building users
Page 37

Page 38

- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- Prioritised Building Upgrade Plan
Linked Actions Code & Title Progress Status Assigned To
RES/24-25/016 Develop and implement plans and support services to
achieve the asset related options agreed by Council Michelle Lynn
RES/24-25/012 Progress the disposal of key strategic sites Michelle Lynn
SR 004 Keeping abreast of
developments in the innovative
use of Information
Technologies
Failure to keep pace with changing technology environment
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
03-Dec-
2024 2 31-Mar-2027 2
James Gallacher;
Patricia Kerr; Dorothy
Nicolson
Potential Effect
A lack of consistent, sufficiently robust service planning in respect of ICT arrangements is likely to result in
the Council being ill prepared to meet future demands in key service areas and lacking the capacity to
respond effectively to changing need such as increased requirement for remote working as identified during
covid pandemic.
Measures of
Impact
• Close relationship and working practices with council Asset Management Service regarding property
rationalisation.
• Implementation of mobile and flexible working, enabling a downsizing of required office accommodation
as people to work more efficiently and to adopt a more flexible policy towards office accommodation and
desk provision.  
• Number of systems that have supplier maintenance contracts. – annual process.
• Invocation of Service Business Continuity Plans and ICT Disaster Recovery plan
• Degree of compliance with security controls to prevent data loss through poor o/s patching, cyber-attack,
firewall configurations, switch replacements/upgrades etc
• Fit for purpose primary and secondary data centres
• Modern Wi-Fi technology in all council locations.
• Broadband speed in the Council area - WDC has 2nd highest broadband speeds in Scotland. 
Investigating funding options for fibre network.
• Number of ICT Service Desk incidents resolved within half day - exceeded the target and higher target
set.
• Extent of functionality development in key Council systems (i.e., lack of development beyond base
system leading to ineffective management information) – several channel shift projects delivered, and
more are in progress. PSN/Risk/challenging. Support service areas.
• Fit for purpose Council website, delivering information and services to a significant percentage of the
Council's customers.
• Provide efficient desktop services supporting laptops, Chromebooks, PCs, Thin client terminals to meet
changing workforce flexibility and property rationalisation requirements.  5-year Device replacement
programme in place.
Risk Factors
• Insufficient resourcing of ICT developments so that benefits and opportunities identified are not realised
• Lack of network security controls implemented. I. e Lack of intrusion detections alerts
• failure to respond to audit / PSN test findings and recommendations,
• insufficient resources allocated to security tasks.  However, Service redesign and ICT resources aligned to
security tasks and improved monitoring processes and tools as well as additional tools purchased to help
support remote working environment all help to mitigate this risk.
• Insufficient Service Business Continuity Plans and/or Disaster Recovery Capability.
• Lack of project and programme change management arrangements.
• Poor quality of mobile communication provision.
• Lack of uptake on channel shift.
Internal Controls
- Ongoing Capital programme established for technology refresh projects
- Information & Communication Technology (ICT) Policies such as ICT Security Framework
- Governance structures such as ICT Steering Board, Education ICT Steering Board, Digital Transformation
Board in place to support governance, integrated planning and decision making in relation to ICT
-Use of both internal IT resources from across the Council and skilled specialist consultants in key areas
Page 38

Page 39

- Fit for purpose primary and secondary data centres
Latest Note
Dec 24
The Council continues to embrace innovative and new technology and has implemented several
improvement projects with a focus on delivering an improved and secure digital workplace experience,
delivering fit for future infrastructure and exploring opportunities with new tech such as Artificial
Intelligence.
There continues to be investment in cloud services with MS SharePoint and One Drive is live for pilot
service areas. Planning of Phase 2 of the project is in progress and SharePoint will be available to
remaining council services from Q1 2025 onwards.
In addition, the Council is currently piloting a new Artificial Intelligence note taking solution with the aim to
deploy across council services early in 2025.
Legacy technology has been replaced with improved and consistent access to the latest office 365 desktop
applications for users, in addition we released a new list of Microsoft Power apps to council employees.  
Laptop devices are now secured and controlled via the Microsoft cloud and a project to redesign the
process to updates devices with windows updates and security patching is progressing well and will reduce
disruption to employees.
ICT in conjunction with NHS are progressing cross-organisation projects with access to WDC Wi-Fi now
available in 3 NHS buildings. NHS employees are now accessing NHS Wi-Fi in Church Street with file access
also now available.
Investment in the latest firewall technology has taken place and this project will not only improve internal
and external security but will also increase data capacity throughput at our data center to allow improved
data performance. This new technology will ensure our security posture is strengthened and bandwidth
capacity is increased at all council sites. The council is also currently researching options to increase our
internet line speed and ensure cloud readiness for future projects.
Risk Opportunity
-365. Provide Council employees with secure access to email and supporting systems from anywhere.
-Opportunity to redesign infrastructure and introduce new tools and security measures to support hybrid
working environments. –
- Annual network penetration tests and for PSN compliance audit
- Annual External Audit on ICT Controls
- Continued investment in ICT infrastructure and its focus on network security and resilience.
- Provide appropriate technology for employees, pupils, and service users as well as for ICT support teams
- Rationalise IT systems
- Increased use of mobile devices e.g., laptop/tablet devices and Chromebooks
- Review of device strategy and efficient/effective approach.
- Provide self-service style systems to employees and citizens
Linked Actions Code & Title Progress Status Assigned To
P&T/24-25/ICT/03 Enable an improved digital workplace experience for
council employees James Gallacher
P&T/24-25/ICT/04 Review and implement MS SharePoint and One Drive James Gallacher
P&T/24-25/ICT/05 Coordinate ICT device replacement programme. James Gallacher
SR 05 Engaging positively with
Residents, Communities &
Partnerships
The risk that the Council fails to adequately engage, establish and maintain
positive relationships with local residents and communities in addition to
partnership bodies.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
06-Dec-
2024 3 31-Mar-2027 2 Colin Smith; Elaine
Troup
Potential Effect
Potential for tensions to develop with residents and local community groups
Reputational damage to council services
Degradation of trust in service provision A failure of strong partnerships could impact on the Councils
obligations under Community Empowerment Act
Page 39

Page 40

Measures of
Impact
Successful delivery of Local Outcome Improvement Plan (LOIP) and supporting plans positive partnership
inspections
Informed and engaged residents participating in consultation activity
Telephone survey monthly, quarterly and annual measures Increased social media engagement and reach
Risk Factors
Inability to deliver improved outcomes which require strong partnership activity
Council's reputation is adversely affected through a failed partnership arrangement
Lack of appropriate staff development / skills may be lacking to support new model of service delivery
Team restructure, post reductions and team overall budget savings challenges the viability of the team to
deliver against strategic plan and community needs.
Inequity of engagement across the partnership on key local issues
Council seen as unresponsive to community if feedback from engagement not acted upon
Apathy within communities leads to little or no engagement Some community groups feel their voices are
not being heard
Internal Controls
Robust partnership arrangements through community planning partnership
Align the Council's strategic plan with the Local Outcome Improvement Plan (LOIP)
Ensure that partners have signed up to deliver on the outcomes and targets set in the LOIP
Develop data sharing protocols with partner agencies
Participate in reform agenda as it impacts on Council area
Ensure robust mechanisms for public feedback (Embedding the Strategic Engagement Framework)
Annual budget consultation events
Citizens Panel
Open Forum questions at Council meetings
Latest Note This risk level has been reviewed and remains unchanged. Across the organisation service areas continue
to improve  methods of engaging with residents, communities and partners.  
Risk Opportunity
Position West Dunbartonshire as a modernising Council
Residents are more comfortable with the digital platform as a result of the enforced cessation of face to
face services - this presents an opportunity to modernise communication
Community Empowerment Act
Participation requests Asset transfer
Linked Actions Code & Title Progress Status Assigned To
CCF/24-25/C&D/05 Explore telephony self-serve options Stephen Daly
CCF/24-25/COM/02 Develop a communication plan to support budget
savings initiatives Lauren Crooks
CCF/24-25/C&D/03 Review accessibility of the website and intranet. Jonathan Muir
CCF/24-25/COM/01 Develop Strategic Communications Strategy Lauren Crooks
SR 06 Challenges in protecting
the Health and Safety of
Employees and Others
Failure to meet the Council’s duty to protect the health, safety and welfare of
its employees and other people who might be affected by its business
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
03-Dec-
2024 4 31-Mar-2027 4 Alison McBride
Potential Effect
Poor health and safety culture within the organisation leading to;
Risk of an employee, service user, pupil (young person) or member of the public being seriously / fatally
injured by fault of the Council; reputational risk regarding negative publicity; financial risk in terms of
claims management compensation to the injured party; increase in insurance premiums; risk of
prosecution by the HSE resulting in a fine and/or a Council Employee being subject to criminal charges,
poor employee morale, high staff turnover leading to diminished service delivery.
Measures of
Impact
Resources associated with in-house/HSE investigation. Incident statistics. Service delivery impact in terms
of injury-related absence and potentially enforced cessation of work activities. Impact of injury on
employees/members of the public, legal proceedings, financial penalties, potential reputational damage and
risk of criminal charges. Hazard reporting. Actions at health and safety committees. Implementation of
Corporate health and safety plan.
Risk Factors Lack of resources, inadequate Safety Management Standards and H&S strategy. Poor health and safety
Page 40

Page 41

culture. Under reporting of incidents. Blame culture. Poor communication between management and
employees. Competent advice.
Internal Controls
•Competent health and safety advice readily available from the Corporate H&S team.
•Corporate health and safety plan developed and monitored via Pentana.
•Robust health and safety management system, FIGTREE.
• Council has in place a robust H&S policy, Safety Management Standards and Fire Risk Management
Strategy that includes service specific health and safety plans, duties and responsibilities for Chief Officers,
managers and employees.
• Adequate H&S resources in place to that will allow statutory obligations in terms of the Health and Safety
at Work etc. Act and supporting legislation.
• Embedded H&S culture that discusses H&S issues at senior level and cascades throughout the
organisation through the health and safety committee system.
• Monthly reports to PMRG on organisational safety performance and issues.
•Chief Officers attend service H&S committees on a quarterly basis.
• Workplace inspection and audit programme.
• Service risk profiling.
• H&S training needs analysis for every employee group.
• The Council has in place a Trade Union Health and Safety Partnership Agreement.
• Council promotes health and safety training for TUs to diploma level.
• Hazard reporting module via FIGTREE.
• Health & safety e-learning package.
• Risk assessment working groups for service areas and review process.
Latest Note
Corporate H&S are actively reviewing and optimising key service areas, including Safety Management
Standards and training.
Figtree is now hosted by Figtree’s own server platform replacing WDC’s ICT servers and there has been a
marked improvement in turnaround times for enhancements to the system.
Work is also being carried out to refine and simplify the health surveillance process in collaboration with OH
and line managers.
The ongoing management of H & S within the Council includes facilitating management workplace
inspections as well as conducting noise monitoring, auditing, scaffold inspections and presenting training.
Furthermore, fire safety management remains a priority across the authority, with the fire risk assessment
programme, fire safety training and support given by Corporate H&S to services to ensure compliance with
regulatory requirements. A significant amount of work has been undertaken to ensure WDC is compliant to
the change in legislation relating to the investigation of fire alarm actuations. Corporate H&S are working
with RPO’s across the Council as well as providing training on the subject both in person and via the e-
learn platform.
Risk Opportunity
Demonstrate to committees, elected members, Trade Unions, employees, the community and other
external partner’s evidence of robust H&S culture. Good knowledge and awareness of health and safety
throughout all services. Positive relationship with Corporate health & safety team and all services. Reduced
incidents, costs and absence rates.
Linked Actions Code & Title Progress Status Assigned To
P&T/24-25/P&C/02 Continue to embed sound H&S practice Harry McGhie
SR 07 Complexities in ensuring
an appropriately resourced and
resilient workforce
Failure to ensure that there is an appropriately resourced and resilient
workforce in place to meet future organisational needs, in effectively
executing the Council’s 2022-27 Strategic Plan.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
13-Dec-
2024 6 31-Mar-2027 2 Alison McBride
Potential Effect
Inability to deliver services effectively
Reduced level of service
HSCP - workforce capacity, recruitment and retention challenges; appropriate training for roles
Lack of improvement or increase in staff absences
Page 41

Page 42

Council underachieves as an organisation
Low staff morale
Employee conflict
Increased turnover Inability to attract/recruit
Measures of
Impact
- Access to and participation of employees in learning and
development activities
- Absence rate and trends
- Employee turnover
- Grievance, discipline and other monitoring information
- Employee  voice and associated actions
- Reports from external scrutiny bodies and award bodies - Benchmarking with appropriate comparators
Risk Factors
- Inability to attract/recruit
- Lack of appropriate development
- inadequate skills
-risk to new models of service delivery
- Lack of resource/capability to deliver - Workforce unable to adapt to change
Internal Controls
- HR processes designed to meet service delivery needs
- Develop new structures to reflect strategic priorities and aligned to Standard Operation Model (SOM)
- Align workforce plan to the Council's strategic planning processes (i.e. have the right people available at
the right time with the right skills to fulfil properly all of the Council's strategic priorities)
- Periodic review of pay arrangements in accordance with EHRC guidance (currently every 3 years)
- Incorporation of succession planning into workforce planning framework
- Identify training programmes to upskill staff
- Effective use of SWITCH to support alternative careers
- Flexible HR policies, in particular People First covering workforce planning, learning & development
(including elearning), digital/continuous improvement, employee wellbeing & engagement.
- Effective use of Occupational Health Service
- Robust Be the Best Conversations process
- Effective leadership and management behaviours, practice and programmes 
Latest Note
Workforce Planning Strategy in place for 2022-2027.
People First Strategy is in place covering 2022-2027 and this is a consolidation of a number of areas: well-
being, employee engagement, workforce planning, learning and development and digital.
WDC are recognised as leading in terms of adapting flexible working practices.
A robust package of wellbeing resources continue to be available, absence levels are closely monitored,
with personal stress and minor, ailments absences prevalent.
Trickle user numbers continue to rise and the tool is used as an additional route to ensure wider spread of
workforce communications alongside an opportunity for employees to share thoughts and ideas. In
addition, the tool is used regularly to gauge employee engagement levels.
Digital Skills approach has been refreshed with a matrix cascade planned across the organisation to
support 365 Share point rollout utilising digital leads and champions. To further support this the digital
team have completed a programme over the last year focusing on digital skills, improving the use of data
and maximising 365 tools. The council wide rollout to SharePoint continues with employees being
supported on the opportunities this software can provide.
Services are currently working on structures and service delivery whilst considering the difficult financial
funding position and the impact of this will be closely supported and monitored.
There have been reductions across the people support functions and this has increased the challenges in
supporting services. HSCP have noted a dissatisfaction due to an increased workload related to this. 
Risk Opportunity - Identify previously unknown skills and talents in the workforce - Realise the potential of staff
Linked Actions Code & Title Progress Status Assigned To
P&T/24-25/P&C/04 Maintain and monitor employee wellbeing,
engagement and workforce planning
Leeanne Galasso;
Louise Hastings; Lisa
MacGregor
P&T/24-25/P&C/03 Implement improvements in recruitment life cycle
processes Lisa MacGregor
P&T/24-25/P&C/05 Review and enhance employee skills and learning
programme Lisa MacGregor
SR 08 Threat of Cyber-attack Data, systems and/or infrastructure are impacted as result of security attacks
which are increasing in number at a time when this threat is already placing
Page 42

Page 43

demands on resources to deliver increased levels of security controls.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
03-Dec-
2024 9 31-Mar-2027 4 Andrew Cameron;
James Gallacher
Potential Effect
• Remote working could be impacted for Council employees and partners HSCP, VJB and WDL by loss of
internet services.
• Disruption to services impacting service delivery to citizens
• Employee and Citizen data loss with the potential for misuse such as identity fraud
• Misinformation being delivered to the public via WDC communication channels
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage
• Redirection of resources to deal with the impact of an attack and away from BAU work 
• Potential for significant fines currently under the Data Protection Act and from May 2018 under the
provisions of the General Data Protection Regulations
• Reputational damage
• Inability to provide a secure information management network for Council and partners including HSCP,
VJB and WDL.
Measures of
Impact
• Obligation to secure Cabinet Office PSN compliance certification.
• Obligation to comply with DWP MOU
• Monitor remote access usage to capacity plan
• Recorded attempts from unauthorised sources to breach council cyber defences
• Recorded cyber related incidents in the Cyber incident log
• Quantity of breaches/incidents reported to the Information Commissioners Office
• Fines levied for breaches 
Risk Factors
• Potential for attacks out of normal working hours /days
• Inappropriate Cyber defences at the perimeter of the council network and NHS interconnect network
• Inappropriate delivery of security patches to desktop, network switches and server estates
• Compliance with security standards such as PSN, PCI, Public Sector Action Plan on Cyber resilience for
Scotland • Continually changing threat landscape
• Maintaining relevant skill sets among employee group / cost of securing expert resources
• Increased targeted attacks and risks due to Remote working.
•Remote access technology may not remain fit for purpose in a Smart working environment
Internal Controls
Robust backup strategy in place on premise and cloud backup for 365 with immutable capability.
• Service Continuity Plans
• ICT Disaster Recovery Plan
• Continually review and update internal policies on patching and system hardening to ensure we keep
abreast of emerging threats and trends
• Annual PSN compliance audit including a comprehensive IT Health Check
• Governance structure in place, ICT Steering Board consisting of senior management and relevant
stakeholders meeting bi-monthly or as required in response to incidents/events
• Programme of Internal and External ICT audits
• Information Security/Data Protection forum.  Project specific forums 
• Multiple layers of Cyber defences
• Network Segregation
• Rolling programme of security awareness sessions
• Interagency and cross Council working groups and sharing.
• National Digital Office / Scottish Government Public Sector Security programme and guidance
• Continually review technologies in line with new working practices to ensure security and assurance is
integral.
• Monthly device and server patching regime.
Latest Note
Dec 24
Cyber strategy, policies and technologies are continually being improved, reviewed and monitored, ICT
continues to follow NCSC guidance where applicable.
Cyber Security team focus has been on promoting employee awareness to cyber risk from both a
professional and personal perspective, this work has resulted in 82% of employees in our recent survey
indicating their Cyber awareness has improved.
Page 43

Page 44

Development of a dedicated security intranet page to provide guidance and advise to employees is being
finalised and will go live December 24.
Progress continues to  improve our Microsoft 365 security and email posture in addition to a review and
update of our Disaster Recover, Cyber Incident Response and Business Continuity plans.
Incident response readiness, security gap analysis and M365 security review has been completed by our
3rd party security partner. Results are currently being reviewed with the aim to agree an improvement
action plan. Our annual Network Penetration testing is underway with the aim to renew our Public Sector
Network certificate early in 2025.
Enhanced online email security training is in progress with continuous phishing campaigns to raise
employee awareness.
There is a continual review of the process to apply security updates, patches, and software deployments.
Recent improvements has redesigned the update process to devices.
Geo-blocking to GB and Ireland remains in place.
Risk Opportunity
• Increase Cyber resilience and awareness for employees, members and citizens, this can be done through
existing training and awareness platform
• Contribute to Scottish Government Public Sector Action Plan on Cyber resilience for Scotland and
potential to become involved in a national/shared security operations centre
• Upskill employees to address current and emerging threats
• Increased employee awareness across Council and partners HSCP, VJB and WDL.
Linked Actions Code & Title Progress Status Assigned To
P&T/24-25/ICT/01 Further secure the Council’s Technology Infrastructure James Gallacher
SR 09 Challenges in delivering
effective services in relation to
Roads & Neighbourhoods
The risk that the Council’s fails to deliver on the three service areas within
Roads & Neighbourhood: Roads & Transportation, Waste & Greenspace and
Capital Projects & Fleet. These areas provide services across a range of areas
including managing and maintaining roads, footpaths and associated
infrastructure, managing flood risk, winter gritting, grounds maintenance,
street cleaning, burial and cremation, outdoor facilities, waste and recycling,
vehicle fleet management and management, Compliance, consultancy
services and delivery of capital projects  Failing to ensure these services are
not fully fit for purpose could result in adverse consequences in relation to
delivering efficient and effective services.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
13-Dec-
2024 4 31-Mar-2027 2 Gail Macfarlane
Potential Effect
- Assets are not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
- Service users seek alternative service provision
-Increase in reactive maintenance costs/ demand/ volume
-Council assets in poor conditions
-Council assets fail to meet relevant standards
- Council projects are not delivered on time or on budget
-Failure to comply with Transport (Scotland) Act 2019 -Failure to comply with Waste (Scotland)
Regulations 2012
- Assets not fit for future and investment not sufficient to fulfil capital investment needs.
Failure to comply with Good Operator License requirements.
Increased reliance on hire vehicles should fleet investment not be adequate.
Measures of
Impact
- Condition surveys
- Defect inspection and management
- Suitability surveys
- Road Condition SPI
-Customer perceptions of service delivery
-Legionella and asbestos inspections,
Page 44

Page 45

- Investment levels in upkeep and improvement of asset base and facilities
-Asset user satisfaction -Operating costs and savings
-Housing adaptations not undertaken timeously
-Local Government Benchmarking Framework (LGBF)
-Association for Public Service Excellence (APSE)
-Waste Managers Network Group
Risk Factors
-Adequacy of funding available to improve asset base
- Adequacy of funding to maintain asset base ie roads at a steady state
- Adequacy of staff resources allocated to the area
- Council assets deemed to be unfit for existing purpose
- Economic conditions may reduce level of potential capital receipts
-Over one third of the road network is in need of repair and the current long term capital funding only
sustains a steady state condition of the road network
- Increased public liability claims due to poor condition of roads network
- Increase public liability claims due to poor condition of footpaths and roads which are not part of our
adopted network.
-buildings such as schools closed for safety if legionella etc present
-Poor customer engagement for recycling, deposit return scheme, refuse transfer station
-Financial challenges
- Budget Sensitivity Analysis (fuel costs, waste refuse disposal tonnage costs, bitumen availability and
costs)
Internal Controls
-Strategic Asset Management Group
- Corporate Asset Management Strategy (scheduled refresh in 2nd half of 2021/22 year)
- Learning Estate Strategy
- Capital Investment Team
- Capital project meetings are carried out monthly in addition to project specific meetings. 
- Capital plan
- Roads and Lighting Asset Implementation Plan
- Fleet Asset Implementation
- Open Space Asset Implementation Plan
- Sustainability Policy
-User feedback – complaints data, Citizens’ Panel and monthly telephone survey
-Fit for future service reviews
-Deposit Return Scheme
-Climate Change Strategy
-Community Empowerment Strategy
-Food Growing Strategy and Allotments
-Equality Outcomes
Latest Note
Service continues to provide full service, monitoring in place to ensure any adverse issues are highlighted
and appropriate actions taken.
No change to Risk Matrix.
Risk Opportunity
-Enhance reputation of Council
-Ensure services are fit for the future and are compliant with legislation changes
-Estate, assets and service delivery (e.g. office and depot rationalisation projects, roads upgrade
programme, vehicle replacement programme, greenspace upgrade projects)
- Secure external funding for development of assets (e.g. EC, lottery, Historic and Environment Scotland)
- The continued implementation of the energy efficient street lighting project will both improve the asset
and reduce costs significantly through reduced maintenance, energy
consumption and carbon output.
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
Linked Actions Code & Title Progress Status Assigned To
R&N/24-25/CI/02 Develop Strategy for transition to electric fleet Neil Fazackerley
R&N/24-25/GS/04 Develop Ash die back action plan Ian Bain
SR 10 Failure to maintain
Housing Stock
The risk that Council’s Housing Stock are not fully fit for purpose with
consequent adverse impact on our ability to deliver efficient and effective
housing for Council tenants.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
Page 45

Page 46

25-Nov-
2024 4 31-Mar-2027 4 Alan Young
Potential Effect
- Housing stock is not utilised in the most effective and efficient manner
- Service cannot be properly delivered to the satisfaction of service users
-Increase in reactive maintenance costs/ demand/ volume
-Housing stock in poor condition
-Housing stock fail to meet relevant standards
- Non-compliance with Scottish Housing Quality Standard
Measures of
Impact
- Condition surveys
- Suitability surveys
- Customer perceptions of service delivery
- Investment levels in upkeep and improvement of housing stock
-User satisfaction
-Operating costs and savings
- Local Government Benchmarking Framework (LGBF)
Risk Factors
- Adequacy of funding available to improve housing stock
- Adequacy of staff resources allocated to the management of housing stock
- Housing stock deemed to be unfit for existing purpose
-Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw
material costs, impacted on supply chains, and third parties and our ability to carry out works within
budget and on time.
Internal Controls
- Housing Capital Investment Programme (refreshed and delivered annually)
- Housing Capital Improvements
- WDC Local Housing Strategy 2021-25
- The Housing Capital Investment Team
- The Planned Maintenance Section
- Housing Asset Management Strategy
- Detailed asset database that shows relevant information on a property by property basis in relation to
HRA properties.
- More Homes Better Home Project Board.
- Telephone Survey feedback
- Fit for future reviews
-Other benchmarking/ feedback
- Climate Change Strategy
Latest Note No change to risk score, programme for investment and upgrades to council housing continues into 24-25
and a further five year programme to 28-29.
Risk Opportunity
-Enhance reputation of Council by being able to improve Council housing stock
-Estate, assets and service delivery (housing investment programme )
-Improved satisfaction from tenants
- The effect of these energy efficiencies has demonstrated that significant savings and environmental
benefit can be achieved through the utilisation of developing technology.
-Improvement of SHQS & EESSH compliance performance and points, and reduced SHQS abeyance
numbers through the strategic planning and management of housing assets.
- Increase in environmental improvements including bin stores
- Increase in internal (e.g kitchens, bathrooms, showers, special needs adaptations, central heating, smoke
detectors, windows and doors) and external updates (e.g new roof coverings, external insulated render and
tenement structural refurbishments)
- Increase in number of New Build Homes as part of the Strategic Housing Investment Programme (SHIP)
-Achieve energy efficiency standard for social housing
Linked Actions Code & Title Progress Status Assigned To
H&E/24-25/HDH/04 Deliver new Housing Asset Management Strategy John Kerr
H&E/24-25/HAI/01 Ensure the Council’s Housing stock maintains
compliance with the Scottish Housing Quality Standard and reduce the
number of properties held in abeyance.
Alan Young
H&E/24-25/HAI/02 Ensure the Council’s Housing stock progresses
towards the achievement of the energy efficiency standard for social
housing.
Alan Young
SR 11 Inability to reduce
carbon footprint in line with
The risk that the Council will be unable to achieve net zero emissions by
2045, both in relation to mitigating carbon emissions and adapting to the
Page 46

Page 47

targets
impacts of climate change. Net zero refers to achieving an overall balance
between emissions produced and emissions taken out of the atmosphere. This
target has been developed in a way that mirrors the emission reduction
trajectory set by the Scottish Government in light of the Climate Emergency.
Current Risk
Matrix
Last
Review
Date
Current
Rating Target Risk Matrix Target Date Target
Rating Assigned To
11-Dec-
2024 6 31-Mar-2027 2 Gillian McNamara;
Elaine Troup
Potential Effect
.          Failure to meet mandatory national and international policy drivers Failure to meet duties placed on
Council by The Climate Change (Scotland) Act 2009
.          Failure to meet duties placed on Council by The Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019
.          Failure to meet duties placed on the Council by The Heat Networks (Scotland) Act 2021 and Local
Heat and Energy Efficiency Strategies (Scotland) Order 2022.
.          Failure to meet the provisions set out in Waste (Scotland) Regulations 2012 which help Scotland
move toward the objectives and targets set out in the Scotland’s Zero Waste Plan to help transition toward
a circular economy.
.          Reputational damage.
.          Financial burden of responding to adverse events such as extreme weather (including, but not
limited to, flooding, heat waves, wind driven storm events, etc.) resulting in action.  Impacts to Council
operations and supply chains as a result of adverse climate/extreme weather events.  This also impacts
residents, local businesses and wider infrastructure across West Dunbartonshire.
.          Financial burden on WDC from increasing energy prices in light of current energy and economic
crises’.  Energy Efficiency works on our own estate must increase to counteract these impacts.
Measures of
Impact
.          Improving organisational resilience against the impacts of climate change.
.          Improving local biodiversity through planting of native trees and bulbs in WDC
.          WDC Waste Services Citizens Panel Survey regarding attitudes towards recycling improving
.          The extension of the Queens Quay District Heating Network to NHS Golden Jubilee Hospital, Social
Housing, NHS Health Centre, Council buildings and further connections as per scope.
.          Inspiring change through including climate change learning in staff induction, training, team
meetings, etc.
.          Uptake in e-learning modules on climate change.
.          Uptake in staff carrying out Sustainable Procurement assessments for tenders.
.          Ensuring climate change and sustainability metrics are included in tenders for
suppliers/contractors/etc. (such as carbon reduction measures) so they are being measured for
accountability for the impacts they have on the environment
.          Management of service areas setting climate change targets for their operations and staff.
.          The uptake of Green Champion roles, which help normalise Climate Change and Sustainability,
practices across the Council. Uptake in sustainable travel such as walking cycling and public transport
Risk Factors
.          Funding availability – delivery of actions to mitigate will require resources, capital works and
investment by the Council- e.g enhanced energy measures, and heating and renewables projects in both
domestic and non-domestic building assets
.          Budget stress – notably due to energy and economic crisis, meaning it’s more difficult for Council to
set aside budget to deliver on Climate Change and Net Zero projects and actions.
.          Funding approach – a combination of internal and external funding sources will be need to delivery
climate action at scale. Short term funding mechanisms such as annual payback of Council expenditure
presents difficulties for delivering long-term projects. Climate Change investments also need to take
account of whole-life costs including reduced maintenance costs and avoided Adaptation costs.
.          Internal capacity – limited staff time and availability, largely due to reduced Council budgets,
further impacted by Covid19.
.          Communication – both internally (to avoid ‘silo’ working) and externally (engaging with the public
and keeping abreast of local/national/international changes to policy).
.          Economics – some technologies, materials and skills are still very expensive so innovation must
progress to enhance the viability of climate actions within the context of the Council’s budget constraints.
.          Strategy and planning – all existing and future Council plans should place responding to the climate
emergency at their core and ensure integration with other Council services.
.          Legislation & Regulatory – the ability to implement some climate actions is constrained at the local
level by minimum standards and other restrictions set through legislation and national policy, for example
in relation to building regulations, planning and procurement.
.          Public attitudes and behaviours - Changing behaviour of residents, businesses and  stakeholders
positively and proactively, especially where there are cost implications to the delivery of climate actions.
Internal Controls .          Climate Change Strategy 2021-2026
Page 47

Page 48

.          Action Plan 2021-2026
.          Climate Change Action Group (CCAG)
.          Pentana Risk Management System – devolved responsibilities of climate change
actions/milestones/KPI’s to service areas.
.          Scottish Government – Mandatory annual Climate Change Duties Reporting
.          Queens Quay District Heating Network
.          Strategic Environment Assessment (SEA)
.          Air quality monitoring
.          Converting some Council pool fleet to Electric Vehicles (EVs).
.          Climate Ready Clyde (CRC) – a cross-sector initiative funded by fifteen member organisations and
supported by the SG. Delivery of a Locale Heat & Energy Efficiency Strategy (LHEES) and delivery plan by
December 2023 – which sets out the Council’s area-based approach to reducing emissions of heating and
energy efficiency improvements to ALL assets across WD.  This includes private housing, businesses, etc.
which are not owned/operated by WDC.
.          Waste infrastructure and greatly improving approach to how Council and residents reduce, reuse
and recycle waste.  Notably, taking a Circular Economy approach to waste services and implementing
appropriate infrastructure and contracts to do so.
Latest Note
The risk remains moderate, and will be reviewed when Scottish Government publish new interim net zero
targets.  The risk level is the same as last time
Risk Opportunity
.Our local environment is protected, enhanced and valued resulting in:
-       Our public spaces are attractive and welcoming
-       Our residents feels pride in their local neighbourhood
-       The percentage of household waste sent for reuse, recycling and composting has increased resulting
in reduction in the percentage that was being landfilled.
-       The percentage of council land which promotes diversity of habitat and species has increased  
.Our resources are used in an environmentally sustainable way
-       Increase in the percentage of businesses taking action to reduce their carbon impact
-       Reduction in CO2 emissions under the Council’s influence
-       Reduction in West Dunbartonshire Area-Wide emissions as per requirements of the climate change
(Scotland) act
-       Residents actively involved in tackling climate change and protecting the environment
-       The economy and infrastructure become more low carbon and environmentally-friendly  
. Our neighbourhoods are sustainable and attractive
-       Increased investment in our housing stock including improving energy efficiency
-       Housing developments are meeting the needs of our changing population
-       The quality of neighbourhoods has improved
-       Our roads and transport network are maintained and they promote safe travel routes
Linked Actions Code & Title Progress Status Assigned To
R&R/24-25/009 Co-ordinate, monitor and report the progress of the
Council’s Climate Change Action Plan for 2024/25 Elaine Troup
R&R/24-25/010 Develop Local Heat and Energy Efficiency Strategy and
Delivery Plan Elaine Troup
Risk Status
Alert
High Risk
Warning
OK
Unknown
Page 48

Page 49

West Dunbartonshire Council
Report by the Chief Officer - Resources
Audit Committee: 19 February 2025
Subject: Treasury Management Mid-Year Report 2024/2025
1. Purpose
1.1 Following approval at Council on 18 December 2024, the purpose of this
report is to provide Members with the opportunity to further scrutinise the
Prudential Indicators on treasury management to 30 September 2024.
2. Recommendations
2.1 Members are requested to consider the report and note that on the 18
December 2024 Council:
(a) Noted the treasury management stewardship information within the
appended report;
(b) Approved the 2024/25 revised estimates of treasury and prudential
indicators as advised within the appended report (Tables A, B, C, D, E,
F, H, L and N); and
(c) Noted that the appended report will be referred to the Audit Committee
for further scrutiny.
3. Background
3.1 In accordance with the Treasury Policy governing the Council’s treasury
management activities during 2024/25, the Chief Officer - Resources is
required to provide a mid year Report to Members regarding the Treasury
function.
3.2 The mid year report covers the period 1 April 2024 to 30 September 2024
and details the current position (where appropriate) and revises the
2024/25 estimates where required.
3.3 The Audit Committee is responsible for ensuring effective scrutiny of the
treasury management strategy and policies and the report will be reported
to a future meeting of that Committee for further scrutiny. 
Item 7
Page 49

Page 50

4. Main Issues
Treasury Management Stewardship Report
4.1 A copy of the report is attached as Appendix 1.
4.2 The report provides details of key changes to the Council’s capital activity
(the prudential indicators), the economic outlook, the actual and proposed
treasury management activity (borrowing and investment) and the risk
approach to treasury management (the treasury management indicators).
4.3 The external debt figures included within Table C includes both short
term and long-term debt. 
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no personnel issues.
7. Financial and Procurement Implications
7.1 There are no direct financial or procurement implications arising from
this report.
8. Risk Analysis
8.1 Although the appended report provides a mid year position in relation
to treasury management there are three main risks associated with
the formulation of prudential indicators and the treasury management
strategy as detailed in Appendix 1.  These risks are noted below;
however the Council has robust monitoring processes in place and
provides regular reports to Council and ensures further scrutiny by
elected Members at the Audit Committee:
(a) Capital receipts which affect the capital financing and borrowing
requirement may not materialise and if this occurs then additional
borrowing will be required in order to fund the financing requirement;
(b) The risk of Counterparties default (i.e. loss of principal sum invested)
must also be taken into account; however the Council has robust
controls included within its treasury management and investment
strategies that will assist in mitigating this risk; and
(c) Capital inflation may increase capital expenditure levels, which in
turn may affect the capital financing and borrowing requirement
Page 50

Page 51

leading to an increase in borrowing, assuming no additional capital
receipts are available. 
9. Equalities Impact Assessment
9.1 No equalities impact assessment was required in relation to this
report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation
to this report.
11. Consultation
11.1 The views of Legal Services have been requested on this report and
have advised there are neither any issues nor concerns.
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are
cornerstones of good governance and support Council and officers to
pursue the 5 strategic priorities of the Council’s Strategic Plan.
12.2 Treasury management contributes to the Financial Strategy via the
interdependency that exists between pro-active treasury management
and the formulation of long-term financial plans.
_______________________
Laurence Slavin
Chief Officer – Resources
Date:  23 January 2025
Person to Contact: Karen Shannon, Finance Business Partner
Council Offices, Church Street, Dumbarton
Email: Karen.Shannon@west-dunbarton.gov.uk
Appendix: Appendix 1: Treasury Management Stewardship Mid-
Year Monitoring Report 2024/25
Treasury Management and Prudential Indicators
1 April 2024 to 30 September 2024
Background Papers: 1. Loans register and portfolio;
2. Debt rescheduling schedules; and
Page 51

Page 52

3. Prudential Indicators 2023/24 to 2032/33 and Treasury
Management Strategy 2023/24 to 2032/33 (Council 27
March 2024)
Wards Affected: No wards directly affected.
Page 52

Page 53

Item 7
Appendix 1
Mid-Year Monitoring Report 2024/25
Treasury Management and Prudential Indicators: 1 April 2024 to 30 September 2024
1. Introduction
1.1 The Council’s treasury management activities are regulated by a variety of  
professional codes and statutes and guidance:
 The Local Government in Scotland Act 2003 (the Act), which provides the
powers to borrow and invest as well as providing controls and limits on this
activity;
 The Act permits the Scottish Ministers to set limits either on the Council or
nationally on all local authorities restricting the amount of borrowing which
may be undertaken (although no restrictions have been made as yet
during 2024/25).
 Statutory Instrument (SSI) 29 2004, requires the Council to undertake any
borrowing activity with regard to the CIPFA Prudential Code for Capital
Finance in Local Authorities, and therefore to operate the overall treasury
function with regard to the CIPFA Code of Practice for Treasury
Management in the Public Services; and the treasury activity with regard
to the CIPFA Code of Practice for Treasury Management in Local
Authorities.
 Statutory Instrument (SSI) 123 2016, set out statutory arrangements for
local authority borrowing and lending and the requirement to maintain a
loans fund and replace the statutory arrangements set out in Schedule 3 of
the Local Government (Scotland) Act 1975 (Schedule 3).
1.2 The regulatory framework of treasury management requires that the Council
receive a mid-year treasury review, in addition to the forward looking annual
treasury strategy and backward looking annual treasury report.  This report
meets that requirement and also incorporates the needs of the Prudential
Code to ensure adequate monitoring of the capital expenditure plans and the
Council’s prudential indicators.  The Treasury Strategy and Prudential
Indicators were previously reported to Council on 27 March 2024.  The current
position is shown (where appropriate) and revisions to the 2024/25 estimate
are provided where required.
1.3 In December 2021, the Chartered Institute of Public Finance and
Accountancy, (CIPFA), issued revised Prudential and Treasury Management
Codes.  These require all local authorities to prepare a Capital Strategy which
is to provide the following: -
 a high-level overview of how capital expenditure, capital financing and
treasury management activity contribute to the provision of services;
 an overview of how the associated risk is managed; and
 the implications for future financial sustainability
The Council’s Capital Strategy was reported to and agreed by Council on 6th
March 2024.
Page 53

Page 54

Appendix 1
1.4 This report sets out:
 Key changes to the Council’s capital activity (the prudential indicators);
 An economic update for the first part of the 2024/25 financial year;
 The actual and proposed treasury management activity (borrowing and
investment); and
 The risk approach to treasury management (the treasury management
indicators).
2. Key Prudential Indicators
2.1 This part of the report is structured to update:
 The Council’s capital expenditure plans and how these plans are being
financed;
 The impact of the changes in the capital expenditure plans on the PIs and
the underlying need to borrow;
 Compliance with the limits in place for borrowing activity; and
 Policy on the statutory repayment of loans fund advances
2.2 Capital Expenditure – Table A shows the current position and revised estimates
for capital expenditure for 2024/25 only. 
Table A: 
£000 2024/25
Original
Estimate
Current
Position
2024/25
Projected
Outturn*
General Services 76,757 16,439 63,013
HRA 73,385 22,787 63,995
Capital Expenditure 150,142 39,226 127,008
Financed by:  
Capital receipts 0 0 0
Capital grants 41,085 42,100 83,489
Revenue / other 250 250 250
Net financing need for the year 108,807 (3,124) 43,269
* it should be noted that the Projected Outturn figures include additional slippage from
2022/23 that were not known at the time of the Original Estimate
2.2.1 The movement in the level of anticipated capital expenditure is mainly due to the
inclusion of additional slippage following the year end; a reduction in anticipated
capital receipts; an increase in spend related to external funding offset by
slippage levels identified to date. The anticipated spends and resources are
regularly reported to Members through budgetary control reports.
2.3 Impact of changes in Capital Expenditure Plans – Table B shows the CFR,
which is the underlying external need to borrow for a capital purpose while
Table C shows the expected debt position over the period. 
Page 54

Page 55

Appendix 1
Table B:
2024/25
£000 Original
Estimate
2024/25
Projected
Outturn
Opening CFR (1 April 2024) 891,537 794,231
New Borrowing 99,415 29,216
LTL repayment in year 0 (1,414)
Closing CFR (31 March 2025) 990,952 822,033
movement in CFR 99,415 27,802
Net financing need for the year (Table A) 108,807 43,269
Loan repayments in year - excluding LTL
(PPP) (9,392) (14,053)
New Borrowing - Movement in CFR (from
previous year) 99,415 29,216
Table C:
£000 2024/25
Original
Estimate
Current
Position
2024/25
Projected
Outturn
External Debt
Estimated/Actual Debt at 1 April 2024 768,637 724,570 727,829
Maturing Debt (268,988) (141,500) (314,677)
Movement in Borrowing
New Borrowing - Maturing Debt 268,988 141,500 314,677
Borrowing adjustment in relation to
over borrowing at year end 0 0 0
New Borrowing – CFR (Table B) 99,415 7,103 29,216
Debt at 31 March (1) 868,052 731,673 757,045
Long Term Liabilities (LTL) at 1 April 89,815 87,449 87,449
LTL repayment in year (Table B) 0 (589) (1,414)
LTL at 31 March (2) 89,815 86,860 86,035
Actual Debt at 31 March (1) + (2) 957,867 818,533 843,080
CFR from Table B 990,952 n/a 822,033
Under/(Over) Borrowing 33,085 n/a (21,047)
2.3.1  The external debt figures included within Table C now includes both short
term and long term debt.  This is due to the current strategy of using short
term borrowing to fund long term capital investment enabling the Council to
take advantage of lower interest rates. The reduction in the estimated external
debt for 2024/25 is due to a reduction in the net capital financing need for the
year. 
2.3.2 The CFR is calculated on a year-end position based on the Council’s balance
sheet and therefore the current position is not shown. The CFR has reduced
from the original estimate due to the forecast level of capital expenditure in
2024/25 being less than budgeted.  The Chief Officer - Resources can report
that the Council is currently on target to meet the 2024/25 revised estimates
for both indicators.
Page 55

Page 56

Appendix 1
2.3.3 Table C highlights that the borrowing of the Council is forecasting a minimal
over-borrowed position against the CFR at 31 March 2025.
2.4 Compliance with the limits in place for borrowing activity – A key control
over the treasury activity is a prudential indicator to ensure that over the
medium term, gross borrowing will only be for a capital purpose. 
Gross external borrowing should not, except in the short term, exceed the
total of CFR in the preceding year plus the estimates of any additional CFR
for 2024/25 and next two financial years.  This allows some flexibility for
limited early borrowing for future years. 
The Council has approved a policy for borrowing in advance of need which
will be adhered to if this proves prudent. The revised indicator is detailed in
Table D and is illustrated by comparing the estimated gross debt as at 31
March 2024 with the CFR as at 31 March 2025.  The Chief Officer -
Resources reports that no difficulties are envisaged for the current year in
complying with this prudential indicator. 
Table D:
£000 2024/25
Original
Estimate
2024/25
Projected
Outturn
CFR at 31 March 2024
Estimate/Actual
(From Table B above) 891,537 794,231
Estimated movement in CFR
2024/25 (From Table B above) 99,415 27,802
2025/26 94,129 100,177
2026/27 49,419 49,419
Anticipated CFR at 31 March 2025 1,134,500 971,629
Gross Debt at 31 March 2023 (From Table C above) 957,867 818,533
2.4.1 The Operational Boundary is detailed in Table E below and is the limit beyond
which external debt is not normally expected to exceed. In most cases, this
would be a similar figure to the CFR, but may be lower or higher depending
on the levels of actual debt.
Table E:
£000 2024/25
Original
Estimate
Current
Position
2024/25
Projected
Outturn
External Debt 945,852 818,533 900,386
2.4.2 A further prudential indicator controls the overall level of borrowing.  This is
the Authorised Limit which is detailed in Table F and represents the limit
beyond which borrowing is prohibited, and needs to be set and revised by
Members.  It reflects the level of borrowing which, while not desired, could be
afforded in the short term, but is not sustainable in the longer term.  It is the
expected maximum borrowing need with some headroom for unexpected
movements. This is the statutory limit determined under section 3 (1) of the
Local Government Act 2003.
Page 56

Page 57

Appendix 1
Table F:
£000 2024/25
Original
Estimate
Current
Position
2024/25
Projected
Outturn
External Debt 1,031,839 818,533 982,239
3. Economic Outlook
3.1 UK *
 Following the 30 October Budget, the outcome of the US Presidential election
on 6 November, and the 25bps Bank Rate cut undertaken by the Monetary
Policy Committee (MPC) on 7 November, we have significantly revised our
central forecasts for the first time since May. In summary, our Bank Rate
forecast is now 50bps – 75bps higher than was previously the case, whilst our
PWLB forecasts have been materially lifted to not only reflect our increased
concerns around the future path of inflation, but also the increased level of
government borrowing over the term of the current Parliament.
 If we reflect on the 30 October Budget, our central case is that those policy
announcements will be inflationary, at least in the near-term. The Office for
Budgetary Responsibility and the Bank of England concur with that view. The
latter have the CPI measure of inflation hitting 2.5% y/y by the end of 2024
and staying sticky until at least 2026. The Bank forecasts CPI to be 2.7% y/y
(Q4 2025) and 2.2% (Q4 2026) before dropping back in 2027 to 1.8% y/y.
 The anticipated major investment in the public sector, according to the Bank,
is expected to lift UK real GDP to 1.7% in 2025 before growth moderates in
2026 and 2027. The debate around whether the Government’s policies lead to
a material uptick in growth primarily focus on the logistics of fast-tracking
planning permissions, identifying sufficient skilled labour to undertake a
resurgence in building, and an increase in the employee participation rate
within the economy.
 There are inherent risks to all the above. The worst-case scenario would see
systemic blockages of planning permissions and the inability to identify and
resource the additional workforce required to deliver large-scale IT, housing
and infrastructure projects. This would lead to upside risks to inflation, an
increased prospect of further government borrowing & tax rises, and a tepid
GDP performance.
 Our central view is that monetary policy is sufficiently tight at present to cater
for some further moderate loosening, the extent of which, however, will
continue to be data dependent. We forecast the next reduction in Bank Rate
to be made in February and for a pattern to evolve whereby rate cuts are
made quarterly and in keeping with the release of the Bank’s Quarterly
Monetary Policy Reports (February, May, August and November).
 Any movement below a 4% Bank Rate will, nonetheless, be very much
dependent on inflation data in the second half of 2025. The fact that the
November MPC rate cut decision saw a split vote of 8-1 confirms that there
are already some concerns around inflation’s stickiness, and with recent
public sector wage increases beginning to funnel their way into headline
Page 57

Page 58

Appendix 1
average earnings data, the market will be looking very closely at those
releases.
 Regarding our PWLB forecast, the short to medium part of the curve is
forecast to remain elevated over the course of the next year, and the degree
to which rates moderate will be tied to the arguments for further Bank Rate
loosening or otherwise. The longer part of the curve will also be impacted by
inflation factors, but there is also the additional concern that with other major
developed economies such as the US and France looking to run large budget
deficits there could be a glut of government debt issuance that investors will
only agree to digest if the interest rates paid provide sufficient reward for that
scenario.
3.2 Scotland**
 The Scottish Government’s budget next year is set to increase by £1.3 billion
from the latest position for 2023-24. This is a rise of 2.6 per cent in cash terms
or a 0.9 per cent rise after accounting for inflation. Most of this increase in
funding comes from income tax. A combination of the Scottish Government’s
policy choices, high inflation, fixed tax thresholds in cash terms and higher
earnings growth in Scotland have all contributed to a sharp increase in
income tax funding.
 However, the ongoing consequences of Scottish Government changes to
social security and the linking of payment rates to inflation have increased
spending commitments. Other Scottish Government policies such as the
Council Tax freeze and increasing public sector pay have further added to the
Scottish Government’s spending commitments.
 Capital spending is set to fall by 4 per cent in real terms between 2023-24 and
2024-25.
 Economic growth will remain fragile in the near term with living standards set
to see the largest fall on record between 2021-22 and 2023-24 and not return
to their 2021-22 level until 2026-27.
 The Scottish Government has introduced a new 45 per cent income tax band
starting at £75,000 and also increased the top rate of income tax by 1
percentage point. These policies affect the top 5 per cent of taxpayers in
Scotland. After taking account of behavioural changes, these policies will
raise an extra £82 million in 2024-25.
 Scottish Government changes to income tax policy since 2017 mean
someone in Scotland earning £100,000 will now pay £3,346 more in income
tax than they would in the rest of the UK
 People with earnings over £28,850 in Scotland, slightly above median
earnings, pay more income tax than they would in the UK. The latest policy
decisions widen the gap further for those earning over £75,000 (the top 5 per
cent of taxpayers).
 The increase in the projected income tax net position in 2024-25 of £712
million is mostly driven by data in 2021-22 to 2023-24.
Page 58

Page 59

Appendix 1
 Social security spending is forecast to increase from £5.3 bn in 2023-24 to
£8.0 bn in 2028-29. By 2028-29, we expect the Scottish Government to spend
£1.5 bn more on social security than BGA funding received from the UK
Government.
 We forecast living standards to remain broadly flat in 2024-25 as inflation will
largely offset growth in nominal household disposable income. Higher interest
rates will continue to reduce disposable income over the next year. *** In part,
this is because the widespread use of fixed-rate mortgages means that the
recent rises in interest rates are passing through to mortgage costs with a
longer lag than in the past.
 The Scottish Government has announced a new income tax rate of 45 per
cent for those earning above £75,000 and increased the top rate of income
tax by 1 percentage point. These changes are estimated to raise a total of £82
million in 2024-25. Our estimates of how much additional revenue will be
raised include an adjustment for an assumed behavioural response. Without
this response revenues would be £118 million higher. Although there is
uncertainty around the scale of a behavioural response, the size of the
estimated response is small in relation to how much income tax revenue is
raised overall and any error in our estimate of the behavioural response would
have a smaller effect on the Scottish budget than, for example, an error in our
earnings forecast
3.3 International update *
 There is also the additional concern that with other major developed
economies such as the US and France looking to run large budget deficits
there could be a glut of government debt issuance that investors will only
agree to digest if the interest rates paid provide sufficient reward for that
scenario.
 Donald Trump’s victory paves the way for the introduction/extension of tariffs
that could prove inflationary whilst the same could be said of further tax cuts
and an expansion of the current US budget deficit. Invariably the direction of
US Treasury yields in reaction to his core policies will, in all probability, impact
UK gilt yields. So, there are domestic and international factors that could
impact PWLB rates whilst, as a general comment, geo-political risks abound
in Europe, the Middle East and Asia.
* Link Group Interest Rate Forecast 11 November 2024
** Scottish Fiscal Commission Report 19 December 2023 & revised version
April 2024 & Report of 27 August 2024
*** Bank of England (2023) Monetary Policy Report – November 2023
3.4 Based upon the above information, the Council’s treasury advisor, Link
Group, has provided the following interest rate forecast as at November 2024.
With no changes made after this date, it sets out a view that short, medium
and long-dated interest rates will fall back over the next year or two, although
there are upside risks in respect of inflation and a continuing tight labour
market, as well as the size of gilt issuance.
Page 59

Page 60

Appendix 1
Table G: -
Source: Link Group
3.5 Downside risks to current forecasts for UK gilt yields and PWLB rates
currently include:
 Labour and supply shortages prove more enduring and disruptive and will
depress economic activity (accepting that in the near-term this is also an upside risk
to inflation and, thus, rising gilt yields).
 The Bank of England acts too quickly, or too far, over the next two years to raise
Bank Rate and causes UK economic growth, and increases in inflation, to be
weaker than we currently anticipate.
 UK / EU trade arrangements – if there was a major impact on trade flows and
financial services due to complications or lack of co-operation in sorting out
significant remaining issues.
 Geopolitical risks, for example in Ukraine/Russia, China/Taiwan/US, Iran, North
Korea and Middle Eastern countries, which could lead to increasing safe-haven
flows.
3.6 Upside risks to current forecasts for UK gilt yields and PWLB rates are as
 The Bank of England is too slow in its pace and strength of increases in Bank
Rate and, therefore, allows inflationary pressures to build up too strongly and for a
longer period within the UK economy, which then necessitates an even more rapid
series of increases in Bank Rate faster than we currently expect.
 The Government acts too quickly to cut taxes and/or increases expenditure in the
light of the cost-of-living squeeze.
 The pound weakens because of the UK’s growing borrowing requirement
resulting in investors pricing in a risk premium for holding UK sovereign debt.
 Longer term US treasury yields continue to rise strongly and pull gilt yields up
even higher than currently forecast.
4. Treasury Management Activity
4.1 This part of the report is structured to update:
 The Council’s expected borrowing need and details of under/(over)
borrowing;
Page 60

Page 61

Appendix 1
 Debt rescheduling and new borrowing;
 Debt charges; and
 Investments
4.2 The Expected Borrowing Need – This was set out in Table C (above) and
demonstrates that at 31 August 2024 the Council is currently projecting and
over-borrowed position. It should be noted that due to current economic
climate the borrowing rates are significantly different than this time last year,
with long term borrowing rates for periods greater than 25 years currently
between 5.30% and 5.55%, depending on length of term for borrowing (as at
27 November 2024). This introduces an element of interest rate risk, as longer
term borrowing rates may rise further; however, this position is being carefully
monitored. 
4.3 Debt rescheduling and new borrowing – The Council has not undertaken
any debt rescheduling during the part of 2024/25 (to 31 September 2024).  In
the year to date naturally maturing debt of £141.500m has been repaid which
has been mainly funded by loans from other local authorities. 
4.4 Debt Charges – The revised estimate for debt charges for both the General
Fund and the HRA is shown in Table H.  
Table H:
£000 2024/25
Original
Estimate
Current
Position
2024/25
Revised
Estimate
Borrowing 22,092 10,993 21,985
Other Long Term Liabilities 21,985 10,237 20,474
Total 44,077 21,230 42,459
4.5 Investments – The objectives of the Council’s investment strategy are to
ensure the re-payment of the principal and interest of its investments on time
with the level of investment return being a secondary objective.  Following on
from the economic background above, the current investment climate has one
over-riding risk consideration which is the risk of default. 
4.5.1 The Council held £28.000m of cash investments at 30 September 2024, and
the constituent parts of the investment position are detailed in Table I:
Table I:
£000 Country < 1 Year 1 – 2 Years 2 – 3 Years
Banks UK 8,000 Nil Nil
Money Market Fund UK 20,000 Nil Nil
Local Authorities UK 0 Nil Nil
Total UK 28,000 Nil Nil
4.5.2 Table J details the revised budget position for investment income.  The
original estimate has increased by £0.168m due to ongoing interest rates
changes.
Page 61

Page 62

Appendix 1
Table J:
£000 2024/25
Original
Estimate
Current
Position
2024/25
Revised
Estimate
Investment Income 530 349 698
4.5.3 A regulatory development to address risk is the consideration and approval of
benchmarks relating to investment security, liquidity and the level of return. 
Benchmarks are currently widely used to assess the level of return and
investment performance, however the application of security and liquidity
benchmarks are more subjective in nature. 
 Security - The Council’s maximum security risk benchmark for the current
portfolio in relation to investment periods of up to one year (when
compared to historic default tables) was set at 0.00% and the Chief Officer
- Resources can report that there have been no defaults of principal sums
invested in the year to date.
 Creditworthiness - Significant levels of downgrades to Short- and Long-
Term credit ratings have not materialised since the crisis in March 2020.
 Liquidity – The Chief Officer - Resources can report that liquidity
arrangements were adequate during the year to date and that the liquidity
facilities and benchmarks set by the Council as noted below were
maintained:
o Bank overdraft - £1.000m; and
o Liquid short term deposits of at least £5.000m available on an
overnight basis.
 Return on Investments – The Chief Officer - Resources can report that
the investment return to date average 4.73%.  Table K illustrates how this
average return compares with the local benchmarks.
Table K:
Benchmark Benchmark Return Average Return
Compound 12 month SONIA* 5.28% 4.73%
Council’s Instant Access Account 5.10% 4.73%
* SONIA is Sterling Overnight Index Average and has replaced LIBOR & LIBID
5 Key Treasury Management Indicators
5.1 This part of the report is structured to update:
 Actual and estimates of the ratio of financing costs to net revenue stream;
 Upper limits on interest rate exposure:
 The maturity structure of borrowing; and
 Total principal sums invested.
5.2 Actual and estimates of the ratio of financing costs to net revenue
stream – This indicator (as shown below in Table L) identifies the trend in the
cost of capital against the net revenue stream.
Page 62

Page 63

Appendix 1
Table L:
2024/25
Original
Estimate
2024/25
Revised
Estimate
General Fund 24.60% 14.44%
HRA 42.68% 55.34%
5.3 Upper Limits on Fixed and Variable Rate Exposure – These indicators
identify a maximum limit for fixed and variable interest rates based upon the
debt position and were set at 100% and 50% respectively for 2024/25.  The
Chief Officer – Resources reports that the Council operates within these
limits.
5.4 Maturity Structures Of Borrowing – These maximum limits are set to
reduce the Council’s exposure to large fixed rate loans (those instruments
which carry a fixed interest rate for the duration of the instrument) which are
due to naturally mature in any given period as detailed in Table M and show
that the Council operates within limits set.
Table M:
Maturity Structure of Fixed
Interest Rate Borrowing
2024/25
Original Limits Current Position
Under 12 months 50% 37%
12 months to 2 years 50% 7%
2 years to 5 years 50% 23%
5 years to 10 years 50% 2%
10 years to 20 years 50% 2%
20 years to 30 years 50% 4%
30 years to 40 years 50% 2%
40 years to 50 years 100% 18%
50 years to 60 years 100% 4%
60 years to 70 years 100% 0%
5.5 Total Principal Funds Invested – These limits are set to reduce the need to
temporarily borrow to cover any unexpected expenditure, and show limits to
be placed on investments with final maturities beyond each year-end.  The
Council currently invests sums for periods greater than 365 days in Clydebank
Property Company and hub West Scotland as detailed in Table N.
Table N:
2024/25
Original
Estimate
Current
Position
2024/25
Revised
Estimate
Principal sums invested
> 365 days (maximum limit £5m) £0.483m £0.483m £0.483m
Page 63