Planning and Regulatory Services Committee 
Tuesday, 28 June 2022 
NOTICE IS HEREBY GIVEN that a Special Meeting of the Planning and
Regulatory Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 28 June 2022 at 14:00. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 14 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
Guidance Note 7 - 8
4 Planning Application  22/00339/APP
Report by Appointed Officer  
Section 42 Application to modify Condition 1 of planning permission
(17/01198/EIA / PPA-300-2052) granting permission for "a period of 30
years from the date when electricity if first exported from any wind
turbine within the development to the electricity network (First Export
Date)" to granting a permission for a period of 35 years Lurg Hill
Deskford Moray for Vento Ludens Ltd  
9 - 72
Page 1

Page 2

5 Planning Application 22/00385/APP
Report by Appointed Officer  
Change of house types approved under ref 15/00244/APP on Plots 4-7
Ordiequish Road Fochabers Moray for Bob Milton Properties Ltd  
73 -
112
6 Planning Application 21/02008/APP
Report by Appointed Officer  
Demolish 2 no agricultural sheds and erect  2 no whisky storage
warehouses at Viewfield Farm Craigellachie Aberlour Moray for Caley
Casks  
113 -
158
8 Planning Application 21/01217/APP
Report by Appointed Officer  
Substitution of house types at plots Nos 267 296 298 to 303 (as per
application 18/01142/APP) and renumber plots to 406-416 R2 Ferrylea
Forres Moray for Springfield Properties PLC  
159 -
194
9 Planning Application 21/01350/APP
Report by Appointed Officer  
Substitution of plots and residential development on site at R2 Ferrylea
Forres Moray for Springfield Properties PLC  
195 -
236
10 Planning Application 21/01717/APP
Report by Appointed Officer  
Substitution of house types at plots nos 156-160 204-211 246 247 and
257-259 renumbered 443-454 Phase 3 (as per application
18/01142/APP) R2 Ferrylea Forres Moray for Springfield Properties
PLC  
237 -
276
11 Planning Application 21/01801/APP
Report by Appointed Officer  
Substitution of house types on Plots 455-466 Phase 3 (as per
application 18/01142/APP) at R2 Ferrylea Forres Moray for Springfield
Properties PLC  
277 -
316
13 Appointment Of Public Analyst, Agricultural Analyst
Report by Depute Chief Executive (Economy, Environment and
Finance)  
317 -
320 
Page 2

Page 3

Item(s) which the Committee may wish to consider with
the Press and Public excluded   
14 Unauthorised Erection of a Fence at Residential
Property in Elgin [Para 12]
• Information relating to instructions to counsel any opinion of
counsel and any advice received, information obtained or action to
be taken in connection with any legal proceedings; 
Summary of Planning and Regulatory Services
Committee functions:
Town and Country Planning; Building Standards; Environmental
Health; Trading Standards; Weights & Measures, Tree Preservation
Orders, and Contaminated Land issues.     
Any person wishing to attend the meeting should contact customer services
on 01343 563217 prior to the meeting as the number of attendees is restricted
due to the recent Covid pandemic 
You can however watch the webcast of the meeting by going to :
http://www.moray.gov.uk/moray_standard/page_43661.html 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
Page 4

Page 5

THE MORAY COUNCIL 
Planning and Regulatory Services Committee 
SEDERUNT 
Councillor David Gordon  (Chair)
Councillor Marc Macrae  (Depute Chair)  
Councillor Neil Cameron  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Donald Gatt  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Paul McBain  (Member)
Councillor Bridget Mustard  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

GUIDANCE NOTE PRODUCED FOR PLANNING & REGULATORY SERVICES COMMITTEE 
REPORT ON APPLICATION 
“Note for guidance of the Committee where the decision of the Planning and Regulatory Services Committee is
contrary to the recommendations of the Director of Environmental Services in respect to a Planning Application.” 
Any Councillor putting forward a motion to refuse an application, contrary to recommendation, shall clearly state the
reasons for refusal.  These reasons should be based on policies contained in the approved Local Development Plan or
some other material consideration.  Time should be allowed to ensure that these reasons are carefully noted for
minuting purposes. 
Where Councillors put forward a motion to approve an application, contrary to recommendation, an indication
should be given of any specific matters which should be subject of conditions along with reasons which should be
based on policies in the approved Local Development Plan or some other appropriate consideration. 
Note for guidance where the decision of the Planning and Regulatory Services Committee is to depart from the
Local or Structure Plan. 
Where a Councillor is convinced that there is reason to depart from Local Development Plan policy; then the
Councillor’s reasons for making the motion should be clearly stated for minuting purposes.  Any matters which should
be subject to conditions drafted subsequently by the Director of Environmental Services should be indicated. If the
Committee remains of a mind to approve such an application then the whole matter will be subject to statutory
procedures as apply. In such cases, Councillors should be aware that the application may require to be advertised as
a departure and any objections reported to the next available meeting of the Planning and Regulatory Services
Committee.  It also may be necessary to convene a hearing to consider the views of objectors. 
There are three potential consequences if Committee takes a decision where the proper procedures have not been
followed in whole or in part.  Firstly, the person aggrieved by a decision may apply to the Supreme Courts in Scotland
for an Order either compelling the Council to act according to law, quashing the decision altogether or declaring a
decision to be unlawful coupled with an order to prevent the decision being implemented.  A referral to the Supreme
Courts in these circumstances is known as applying for Judicial Review.   
Secondly, in addition to the application for Judicial Review when questions of alleged failure, negligence or
misconduct by individuals or local authorities in the management of public funds arise and are raised either by or
with the External Auditor of the Council and where an individual can be blamed the sanctions available are:- 
Censure of a Councillor or an Officer
Suspension of a Councillor for up to one year
Disqualification of a Councillor for up to five years 
In the case of the Council being to blame, recommendations may be made to the Scottish Ministers about rectification
of the authorities accounts. Ministers can make an order giving effect to these recommendations. 
Thirdly, whilst the Ombudsman accepts that Planning authorities have the freedom to determine planning applications
as they wish procedural impropriety may be interpreted as maladministration.  This can also lead to recommendations
by the Ombudsman that compensation be paid. 
Consistent implementation of departure procedures maintains public confidence in the planning system and is
consistent with the time and effort invested in preparing the Local Development Plan. 
Page 7

Page 8

Page 8

Page 9

WARD 02_17 
22/00339/APP
7th March 2022
Section 42 Application to modify Condition 1 of planning
permission (17/01198/EIA / PPA-300-2052) granting
permission for "a period of 30 years from the date when
electricity if first exported from any wind turbine within
the development to the electricity network (First Export
Date)" to granting a permission for a period of 35 years
Lurg Hill Deskford Moray 
for Vento Ludens Ltd 
Comments: 
 The application is being reported to Committee as the overall area of the
proposed site exceeds a maximum of 2 hectares. 
 No representations received.
 Advertised for the purposes of Neighbour Notification and as Schedule 3 (The
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013) development. 
Procedure: 
 None. 
Recommendation 
Grant Planning Permission – Subject to the following: 
Conditions/Reasons 
1. The permission as hereby granted is for a period of 35 years from the date when
electricity is first exported from any wind turbine within the development to the
electricity grid network (First Export Date), and written confirmation of this First
Export Date shall be provided to the Council, as planning authority within one
month thereof. 
Reason: To define the duration of the permission. 
2. In the event that any wind turbine(s) installed and commissioned fail(s) to supply
electricity on a commercial basis to the grid for a continuous period of 6 months,
or is no longer required, the turbine(s) in question shall be deemed to have
ceased to be required. Under such circumstances, any wind turbine(s) along with
any ancillary equipment, fixtures and fittings no longer required in connection with
the remaining turbine(s) shall be dismantled and removed from the site within 3
Item 4
Page 9

Page 10

months of the end of the said continuous 6 month period, or when ceasing to be
no longer required. 
Thereafter, the surrounding land shall be re-instated in accordance with a re-
instatement scheme to include specification of all works and timescale for re-
instatement of the land which shall previously have been submitted to and
approved by the Council, as planning authority. 
Reason: To ensure that any redundant or non-functioning wind turbine(s) is/are
removed from the site in the interests of public safety, amenity and environmental
protection and to ensure acceptable arrangements for the re-instatement of the
ground are provided. 
3. No development shall commence until: 
a)   a draft Decommissioning and Site Restoration Plan for the site has been
submitted to and approved in writing by the Council, as planning authority in
consultation with SEPA, SNH and/or other agencies as appropriate; and 
b)   thereafter, and not later than 12 months prior to the expiry of this permission
or decommissioning of the development, whichever is the sooner, a detailed
Decommissioning and Site Restoration Plan, based upon the principles
outlined in the approved draft Plan, shall be submitted to and approved by
the Council, as planning authority in consultation with SEPA, SNH and/or
other agencies as appropriate. 
The required/proposed plans shall include provision for all turbines and ancillary
infrastructure and equipment (including all buildings and structures, hardstandings
and tracks, etc.) to be decommissioned, de-energised and dismantled to at least
ground level and thereafter, removed from the site together with the arrangements
to retain any access tracks and other infrastructure on the site, the treatment of
disturbed ground surfaces, the management and timing of all proposed works, the
provisions for environmental management including traffic and other plans to
address issues and impacts likely to arise during the decommissioning period and
the provisions for the restoration and aftercare of the site. 
Thereafter, the development shall be decommissioned and the site restored and
re-instated in accordance with the approved Plan details. 
Reason: To ensure the arrangements for both decommissioning of the
development and re-instatement of the site are undertaken in an appropriate
environmentally acceptable and timeous manner, with all wind turbines and
associated infrastructure permanently removed from the site in the interests of
safety, environmental protection, amenity and appearance of the site and the
surrounding area. 
4. Prior to the development commencing, details shall be submitted to and approved
in writing by the Council, as planning authority regarding evidence of a bond or
other similar financial provision to be put in place to cover all decommissioning
and site restoration costs on the expiry of the permission or where the turbines
cease to be required, whichever is the sooner. The required bond or equivalent
shall: 
Page 10

Page 11

a)  be based on the Decommissioning and Site Restoration Plan (as required by
Condition 3);
b)  include documentary evidence to demonstrate that the amount of the bond
or financial provision is sufficient to meet the full estimated costs of
decommissioning and site restoration, including dismantling, removal,
disposal, site restoration, remediation and all other incidental works and
professional costs; and 
c)  include details to ensure and demonstrate that the proposed financial
arrangements will be maintained and be subject to periodic review
throughout the lifetime of the development. The findings of each successive
review shall be submitted to and approved by the Council, as planning
authority, and include evidence to demonstrate that financial arrangements
continue to remain in place and remain sufficient for both the
decommissioning of the development and restoration of the site. The review
period shall be not less than 5 yearly intervals from commencement of the
development, or such other period as may be agreed in writing with the
Council, as planning authority. 
Thereafter, the development shall not commence until written evidence has been
provided to the Council, as planning authority to confirm that the approved bond or
financial provision arrangement has been put in place. 
Reason: To ensure that sufficient funds are available to address the anticipated
arrangements and estimate of costs of decommissioning and re-instatement and
restoration of the site. 
5. No development shall commence until details have been submitted to and
approved by the Council, as planning authority in consultation with SNH, SEPA
and other agencies where appropriate regarding: 
a)  confirmation of the make, model, design, power rating and sound power
levels of all turbines to be used (and at all times the total number of turbines
to be erected shall not exceed 5 and the blade tip height shall not exceed
130m above ground level); 
b) the external colour and/or finish of the turbines including towers, nacelles
and blades, which shall be non-reflective, semi-matt pale grey/off-white; 
c) unless otherwise located within the tower of each wind turbine, the location,
design specifications and external material finishes and colour of any
external wind turbine transformer housing together with details, including
landscape and visual impact information, to demonstrate that the external
housing will not adversely affect the landscape and visual character, integrity
and amenity of the site and the surrounding area; 
d) for the sub-station compound, the design external appearance and material
finishes and colour of all proposed buildings and structures to be erected,
stationed or installed within the compound area (including any sub-station
control building) together with the finalised site layout arrangements
including the location, dimensions, external appearance and surfacing
materials for the compound area, all fencing or other means of enclosure to
be erected and all other proposed/required ancillary infrastructure to be
provided including any required/proposed external switch gear infrastructure
to be located within the compound, the arrangements for access and parking
Page 11

Page 12

and disposal of foul and water from the compound area, external lighting
arrangements (where proposed), etc.; 
e)  for the temporary construction compound, the location, extent and site layout
arrangements including the placement and purpose/use of all
buildings/structures within the compound, areas for storage of materials,
parking, disposal of foul and surface water, means of enclosure, and external
lighting arrangements, etc. together with timescales for both establishment
and removal of the temporary construction compound and details for
restoration and re-instatement of the site following removal of the temporary
compound; 
f)  detailed access track designs for all on-site access tracks and passing
places, to include their location and routing, design construction
specifications and surfacing materials, and the arrangements for drainage
disposal for each track section. 
g)  the location(s) and design specification(s) for all required/proposed up-
graded existing and new watercourse crossings and engineering works
within the water environment. With the exception of any proposed
watercourse crossings and directly related tracks, the details shall
demonstrate that all new infrastructure works occur outwith a 50m buffer
area from water features on the site unless justification is provided, all
watercourse crossings shall be adequately sized to enable them to
accommodate 1 in 200 year peak flows (with allowance for climate change of
30% increase in flows) at each point without causing constriction of flows or
increasing the risk of flooding elsewhere, and where watercourse crossings
cannot be avoided, the use of bottomless or arched culverts (or bridging
solutions) which do not affect the bed or banks of the watercourse, and all
designs of crossings shall follow good practice guidelines; 
h)  a drainage assessment or strategy to manage all drainage from the site to
include the location(s) and design specification(s) and timescale(s) for
provision of the arrangements for the disposal of foul and surface water from
the site, the former shall include the disposal of effluent from the site and the
latter shall incorporate SUDs, and provide for details to address both
construction and operational stages of the development and demonstrate
how run-off will be managed to minimise the risk of flooding, erosion,
sediment run-off and pollution of any watercourse. (These details may be
incorporated within any site specific Construction and Environmental
Management Plan (CEMP) (see Condition 6 below)); 
i)  details of all required/proposed pre-commencement of development
ecological surveys to be undertaken to determine the presence or otherwise
of any designated habitat or protected species, to include a schedule
identifying which habitats and species will be subject to survey, the scope
and time-scale(s) for undertaking each survey, and thereafter the results of
the surveys together with all further measures required/proposed to mitigate
the impact of the development upon species and habitats as identified within
the Environmental Statement (Chapter 13 Ecology and Ornithology refers).
This shall include a goshawk breeding survey prior to construction or felling
as recommended within Chapter 13. (These details may be incorporated
within any site specific CEMP (see Condition 6 below));
j) details of all further targeted ground investigation works to inform the geo-
technical design for each element of the development, to include a schedule
Page 12

Page 13

to identify which works element will be subject to further investigation, and
thereafter the outcomes of such investigation, to include the location and
design specification for further works and all measures required/proposed to
mitigate the impact of the development works. Site compounds that are
required to enable the site investigation works shall be agreed with the
Planning Authority in advance in terms of siting and form of construction.
(These details may be incorporated within any site specific CEMP (see
Condition 6 below)); 
k)  where potentially affected by the development, for example by constructing
new or up-graded existing access tracks, details of the arrangements to
monitor private water supplies during all stages of the development, and in
the event of any adverse effect(s) on water quality or quantity being
identified, the arrangements and procedures to undertake restorative and
remedial works to maintain any supply (as recommended within the
Environmental Statement, Chapter 12 refers); This shall include in particular
measures to monitor the supply known as ‘Mid Skeith’ to detect any changes
to water quality and allow for further mitigation measures to be put in place if
necessary; and 
l)  confirmation of all required/proposed mitigation measures (where not already
embedded within the submitted design and layout of the development) for all
stages of the development, to be contained within a Schedule of Mitigation or
similar together with details regarding the process to control/action changes
from any agreed Schedule of Mitigation. The Schedule shall include (but not
be limited to) all required/proposed measures to mitigate the impact of the
development upon the water environment (hydrology, hydrogeology and
geology) and nature conservation (ecology and ornithology including
protected species and sensitive habitat) interests. (These details may be
incorporated within any site specific CEMP (see Condition 6 below)). For the
avoidance of doubt this permission does not include approval for the
formation of any borrow pits. 
Thereafter, the development shall be implemented in accordance with the
approved details 
Reason: Details of the matters specified are lacking from the submission and to
ensure an acceptable form of development in landscape, visual and/or other
environmental considerations, including addressing the risk of damage from
flooding and surface water effects including pollution, erosion and sediment
impacts on the environment, to minimise impacts on ecological habitats, in the
interests of good land management and protection and enhancement of habitats,
and to maintain the wholesome provision of any private water supply where
affected by the development. 
6. No development shall commence until details have been submitted to and
approved by the Council, as planning authority in consultation with SEPA and
SNH and other agencies as appropriate regarding a site-specific Construction and
Environmental Management Plan (CEMP). The CEMP shall address all issues for
all stages of the development (i.e. pre-construction, construction, operation and
decommissioning), identify all works and elements of the development potentially
capable of giving rise to pollution or causing environmental harm, and identify all
Page 13

Page 14

required/proposed measures to mitigate the identified impacts, including those as
set out in the Environmental Statement (Volume 1 Written Statement) and in
particular, but not limited to, those identified in relation to the water environment
(Chapter 12, Hydrology, Hydrogeology and Geology/Peat) and ecology and
ornithology (Chapter 13 Ecology and Ornithology). The CEMP shall demonstrate
the incorporation, rather than by reference alone, of SEPA’s Pollution Prevention
Guidelines including those relating to construction and provide for (but not be
limited to) the following: 
a)  methods of construction and working for the provision of all turbines and site
infrastructure; 
b)  site waste management plan – for all aspects of waste produced on the site; 
c)  pollution prevention and control measures – to include arrangements for
storage and management of oil, fuel and concrete on the site; 
d)  construction surface water management plan - to include a map of all
watercourses and ditches on site and all proposed infrastructure, mitigation
proposals and justification of appropriateness, a map of all proposed
mitigation locations (i.e. silt fences, straw bales, cross drains, settlement
lagoons, etc.) and details of procedures for dealing with emergencies and
spills; 
e)  drainage management plan - to address the management of foul and surface
water drainage, in both water quality and quantity terms and the
arrangements to dispose of foul effluent, and manage surface water to
prevent flooding, and pollution of water courses (see Condition 5 g) 
f)  stream crossings and all watercourse engineering (see Condition 5 f)); 
g)  peat protection/management plan to show how the finalised micro-sited
layout has been designed to minimise impact on and avoid areas of deep
peat; 
h)  emergency procedures to include the locations and use of spill kits, etc. and
provisions for staff training; 
i)  adverse weather (wet weather) working – to include an action plan (after
H&S considerations) about arrangements for working and assessment of
potential damage including sediment mitigation, use of equipment (for
example, pumps), etc.; 
j)  ground and surface water management and treatment - to include details for
monitoring (to be established prior to the commencement of works on site
and thereafter for all subsequent stages of the development), and a
response plan to detail actions to be taken should impacts on the water
environment occur; 
k)  water abstraction – to include details of any abstraction/dewatering,
proposed quantities, uses and discharges including use of any temporary
sub-surface water controls such as de-watering during construction (and
where de-watering is used, the Plan shall demonstrate that any such
discharges are limited to discharges that are of uncontaminated groundwater
abstracted directly through boreholes/well pointing and discharged without
contact with any other drainage run-off);
l)  formation of construction compound to include the arrangements for
refuelling, tools and materials storage, car parking and concrete batching
plant, settlement lagoons (to prevent cement and concrete washing out into
ground or surface water) and the details of the final outfall to surface or
groundwater and the arrangements to treat such effluent prior to discharge,
Page 14

Page 15

for example by installation of a treatment plant or use of alternative
arrangements (for example, that wash out water is tankered off-site, etc.); 
m)  dust management plan; 
n) measures to prevent loose or deleterious material being deposited on the
local road network including provision for on-site wheel cleaning, etc. 
o)  noise management plan - to identify all sources of noise emissions
associated with the construction phase of the development together with
details of all measures to manage and mitigate the effects of construction
noise occurring at and within the site; 
p)  species protection plans – to include arrangements for pre-commencement
surveys to confirm presence or absence of species and habitats, timing(s) of
works to avoid disturbance, development of buffer areas to prevent
encroachment onto and into areas of protected species and valued habitats
(see Condition 5 i)); 
q)  invasive non-native species protocol – to address all bio-security and other
measures to be adopted to remove or prevent the spread of any non-native
plant species on the site; and 
In addition, the CEMP shall include reference to the terms of appointment of an
appropriately qualified Ecological Clerk of Works (ECoW), to be appointed by the
applicant/developer/wind turbine operator and approved by the Council, as
planning authority in consultation with SNH. The terms should identify the
period(s) of appointment and the remit of the ECoW in terms of roles and
responsibilities which should include (but not be limited to) undertaking pre-
construction survey work and monitoring compliance with the hydrological and
ecological/ornithological commitments and mitigation arrangements to be
undertaken, as identified in the Environmental Statement and other supporting
documents including the CEMP, overseeing the placement of development
infrastructure within the site and addressing all environmental considerations, and
the arrangements for reporting upon works undertaken on site and incidences of
non-compliance of works to the Council, as planning authority and the
applicant/developer/wind farm operator’s construction representatives. 
Thereafter, the development shall be carried out in accordance with the approved
Plan. 
Reason: In order to ensure that all development works are undertaken and
managed in an environmental acceptable manner and to minimise the impacts
arising from construction and operation of the development upon the environment,
to secure detailed information on the delivery of mitigation works and measures as
identified which are current lacking from the submitted particulars and to secure
effective monitoring and compliance of all required/proposed environmental and
ecological mitigation and management measures associated with implementation
of the development. 
7. The blades of all turbines shall rotate in the same direction and no name, symbol,
sign or logo or similar means of advertisement, other than those required for
health and safety reasons, shall be displayed on any part of the turbines, masts,
buildings/ structures and plant, or other infrastructure associated with the
development without the prior written consent of the Council, as planning
Page 15

Page 16

authority. 
Reason: To minimise the visual impact arising from the appearance of the
development. 
8. The compensatory planting proposals as detailed within the accompanying
document entitled Updated Forestry Replanting Specifications, Revised 3rd March
2018 shall be implemented in full, unless otherwise agreed in writing with the
planning authority. 
Reason: To mitigate the effects of the development on woodland and ensure
provision of satisfactory compensatory planting. 
9. The proposed route for any abnormal loads on the trunk road network must be
approved by the trunk roads authority prior to the movement of any abnormal
load. Any accommodation measures required including the removal of street
furniture, junction widening, traffic management must similarly be approved. 
Reason: To ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network. 
10. Any additional signing or temporary traffic control measures deemed necessary
due to the size or length of loads being delivered must be undertaken by a
recognised Quality Assured traffic management consultant, to be approved by the
trunk road authority before delivery commences. 
Reason: To ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network. 
11. Prior to the commencement of any part of the development: 
a.  detailed proposals for undertaking trial runs and also delivery of abnormal
indivisible loads, must be submitted for approval by the Planning Authority in
consultation with Roads Authority. Details must include but not be limited to
detailed proposals (1:200 drawing) of the temporary measures to be
provided and the proposed access onto the C4L, temporary and permanent
modifications and measures required to protect the public road and
structures, traffic, vehicle holding areas and non-vehicular management
during deliveries, time restrictions for deliveries i.e. outwith school crossing
patrol times. 
b.  a Construction Traffic Management Plan (CTMP) must be submitted for
approval by the Planning Authority in consultation with the Roads Authority.
The traffic management plan must cover the duration of the development,
methods of dealing with the large delivery vehicles. The plan shall also
include, the methods of marshalling and manoeuvring at junctions on the
public road network and any temporary traffic waiting restriction
requirements and all modifications to the road network and traffic
management arrangements. Routes for deliveries to and from the site and
confirmations of routes not to be used by construction vehicles and workers
to access the site. 
c.  details (1:200 scale drawing) of the proposed access junction onto the C4L
Page 16

Page 17

(Bogmuchals - Berryhillock Road) must be submitted and approved by the
Planning Authority in consultation with the Roads Authority. The width of the
vehicular access shall be a minimum of 7.3m and have a maximum gradient
of 1:20 measured for the first 25m from the edge of the public carriageway
(B9010). The first 25 metres of the access shall be to The Moray Council
specification and surfaced with hot rolled asphalt. Any existing ditch,
watercourse or drain under the site access shall be piped using a 300mm
minimum diameter of pipe. The pipe shall be laid to a self-cleansing gradient. 
d.  a detailed drawing (scale 1:500 or 1:1000 which shall also include details to
demonstrate control of the land ) showing a visibility splay 4.5 metres by 160
metres and a schedule of maintenance for the area within the visibility splay
shall be submitted to and approved by the Council, as Planning Authority in
consultation with the Roads Authority. 
e  detailed drawing(s) (scale 1:500) showing the location and design of 3
passing places at locations to be agreed with the Roads Authority. One
approximately 50 -100m to the west of the proposed access onto the C4L to
replace the existing passing place at the access onto the C4L. The second
(to achieve a maximum passing place spaced of not more than 150m) to be
located approx. 50 - 100m to the east of the proposed access onto the C4L.
The third passing place to be located approx. 130-150m east of the existing
passing place at Greenhill (to achieve a maximum spacing of not more than
150m between passing places). 
Thereafter, the works shall be implemented in accordance with the approved
details. 
Reason: To ensure an acceptable development in road safety terms through the
provision of details currently lacking. 
12. Prior to the commencement of construction and deliveries: 
a.  Evidence that a S96 ‘Wear and Tear’ agreement between the developer and
the Roads Authority has been completed and signed by both parties, must
be submitted to the Planning Authority. The scope of the agreement shall
assess, monitor and address the impact of construction and delivery traffic
on the road network for the duration of the construction of the development
and must include all roads within the Moray Council area between the site
access and the first ‘A’ class road along the agreed construction access
route(s). 
b.  Abnormal load trial run(s) must be undertaken after all mitigation works have
been completed to confirm the works are acceptable and to identify any
other restrictions not previously addressed and the frequency and location of
abnormal load passing places/oncoming vehicle holding areas required.
Representatives from Moray Council Transportation (Traffic), and Police
Scotland must be invited to the trial run. 
c.   Prior to any abnormal indivisible load being delivered to the site, all
suspensive works approved through condition (1 a,b,c,d,e) required prior to
commencement of construction, must be provided in accordance with the
approved plans. Any works undertaken are to be permanent for the duration
of the operation of the development unless otherwise agreed in writing with
the Roads Authority. 
Page 17

Page 18

d.   The visibility splay of 4.5m by 160m shall be provided and thereafter the
visibility splay shall be maintained at all times free from any obstruction
exceeding 1.0 metres above the level of the carriageway in accordance with
the agreed schedule of maintenance. 
Thereafter, the works shall be implemented in accordance with the approved
details. 
Reason: The provision of details currently lacking and in order to ensure that
acceptable infrastructure is provided on the route to/from the development in the
interests of road safety. 
13. At the reasonable request of the Council, as planning authority following receipt of
any complaint where interference to domestic television reception is caused as a
result of the development hereby approved, the applicant/developer/wind turbine
operator shall take steps to make good the reception, either by eliminating the
cause of the interference or by providing an alternative means by which television
signals may be received. Within two (2) weeks of being notified by the Council, as
planning authority of the existence of such interference (or within a longer period
as the planning authority may allow) the applicant/developer/wind turbine operator
shall submit to the Council, as planning authority for its approval, proposals to
make good the reception, including the timescale(s) within which the proposals
will be undertaken. 
Thereafter, the development shall be carried out in accordance with the approved
details. 
Reason: In accordance with the applicant's submitted particulars and in order to
ensure that an alternative means of obtaining television reception can be achieved
and/or mitigated in the event of interference caused to domestic television
reception. 
14. At the reasonable request of the Council, as planning authority following receipt of
any complaint where interference to fixed link frequency band signals is caused as
a result of the development hereby approved, the applicant/developer/wind turbine
operator that take steps to make good the fixed link frequency band signals, either
by eliminating the cause of the interference or by providing an alternative means
by which fixed link frequency band signals may be received. Within two (2) weeks
of being notified by the Council, as planning authority of the existence of such
interference (or within such longer period as the planning authority may allow) the
applicant/developer/wind turbine operator shall submit to the Council, as planning
authority for its approval proposals to make good the fixed link frequency band
signals, including the timescale(s) within which the proposal shall be undertaken. 
Thereafter, the proposals shall be carried out in accordance with the approved
details. 
Reason: In order to ensure that an alternative means of maintaining fixed link
telecommunications infrastructure can be achieved and fixed promptly in the event
of interference caused to existing fixed links.
Page 18

Page 19

15.   The rating level of noise emissions from the combined effects of the wind turbines
(including the application of any tonal penalty) when determined in accordance
with the attached Guidance Notes (to this condition), shall not exceed the values
for the relevant integer wind speed set out in, or derived from, the tables attached
to these conditions at any dwelling which is lawfully existing or has planning
permission at the date of this permission and: 
a)  The wind farm operator shall continuously log power production, wind speed
and wind direction, all in accordance with Guidance Note 1(d). This data
shall be retained for a period of not less than 24 months. The wind farm
operator shall provide this information in the format set out in Guidance Note
1(e) to the Local Planning Authority on its request, within 14 days of receipt
in writing of such a request. 
b)  Within 21 days from receipt of a written request from the Local Planning
Authority following a complaint to it from an occupant of a dwelling alleging
noise disturbance at that dwelling, the wind farm operator shall, at its
expense, employ a consultant approved by the Local Planning Authority to
assess the level of noise emissions from the wind farm at the complainant’s
property in accordance with the procedures described in the attached
Guidance Notes. The written request from the Local Planning Authority shall
set out at least the date, time and location that the complaint relates to and
any identified atmospheric conditions, including wind direction, and include a
statement as to whether, in the opinion of the Local Planning Authority, the
noise giving rise to the complaint contains or is likely to contain a tonal
component. 
c)  The assessment of the rating level of noise emissions shall be undertaken in
accordance with an assessment protocol that shall previously have been
submitted to and approved in writing by the Local Planning Authority. The
protocol shall include the proposed measurement location identified in
accordance with the Guidance Notes where measurements for compliance
checking purposes shall be undertaken, whether noise giving rise to the
complaint contains or is likely to contain a tonal component, and also the
range of meteorological and operational conditions (which shall include the
range of wind speeds, wind directions, power generation and times of day) to
determine the assessment of rating level of noise emissions. The proposed
range of conditions shall be those which prevailed during times when the
complainant alleges there was disturbance due to noise, having regard to the
written request of the Local Planning Authority under paragraph (b), and
such others as the independent consultant considers likely to result in a
breach of the noise limits. 
d)  Where a dwelling to which a complaint is related is not listed in the tables
attached to these conditions, the wind farm operator shall submit to the Local
Planning authority for written approval proposed noise limits selected from
those listed in the Tables to be adopted at the complainant’s dwelling for
compliance checking purposes. The proposed noise limits are to be those
limits selected from the Tables specified for a listed location which the
independent consultant considers as being likely to experience the most
similar background noise environment to that experienced at the
complainant’s dwelling. The rating level of noise emissions resulting from the
combined effects of the wind turbines when determined in accordance with
Page 19

Page 20

the attached Guidance Notes shall not exceed the noise limits approved in
writing by the Local Planning Authority for the complainant’s dwelling. 
e)  The wind farm operator shall provide to the Local Planning Authority the
independent consultant’s assessment of the rating level of noise emissions
undertaken in accordance with the Guidance Notes within 2 months of the
date of the written request of the Local Planning Authority for compliance
measurements to be made under paragraph (b), unless the time limit is
extended in writing by the Local Planning Authority. The assessment shall
include all data collected for the purposes of undertaking the compliance
measurements, such data to be provided in the format set out in Guidance
Note 1(e) of the Guidance Notes. The instrumentation used to undertake the
measurements shall be calibrated in accordance with Guidance Note 1(a)
and certificates of calibration shall be submitted to the Local Planning
Authority with the independent consultant’s assessment of the rating level of
noise emissions. 
f)   Where a further assessment of the rating level of noise emissions from the
wind farm is required pursuant to Guidance Note 4(c), the wind farm operator
shall submit a copy of the further assessment within 21 days of submission
of the independent consultant’s assessment pursuant to paragraph (c) above
unless the time limit has been extended in writing by the Local Planning
Authority. 
Table 1: Between 07:00 and 23:00 – Noise limits expressed in dB LA90,10 minute
as a function of the standardised wind speed (m/s) at 10 metre height as
determined within the site averaged over 10 minute periods. 
LOCATION Standardised wind speed at 10 meter height (m/s) within the site 
4 5 6 7 8 9 10 11 12
Myreton  35.0  35.0  35.3  37.9  40.9  44.1  47.7  51.6  55.8 
Clochmacreich  35.0  35.7  38.7  41.5  44.1  46.3  47.8  48.6  48.4 
Kintywaird  35.0  35.0  36.2  39.1  41.9  44.6  47.0  48.9  50.0 
Brambleburn Cottage  35.0  35.0  35.0  37.0  39.9  42.8  45.4  47.5  48.8 
Over Windyhills  35.0  35.7  38.7  41.5  44.1  46.3  47.8  48.6  48.4 
Netherton of Windyhills  35.0  35.7  38.7  41.5  44.1  46.3  47.8  48.6  48.4 
Backies  35.0  35.7  38.7  41.5  44.1  46.3  47.8  48.6  48.4 
Upper Skeith  35.0  35.7  38.7  41.5  44.1  46.3  47.8  48.6  48.4 
Mid Skeith  35.0  35.7  38.7  41.5  44.1  46.3  47.8  48.6  48.4 
Little Skeith  35.0  35.0  36.2  39.1  41.9  44.6  47.0  48.9  50.0 
Langley  35.0  35.0  35.0  37.0  39.9  42.8  45.4  47.5  48.8 
Croylet  35.0  35.0  35.0  37.0  39.9  42.8  45.4  47.5  48.8 
Table 2: Between 23:00 and 07:00 – Noise limits expressed in dB LA90,10 minute
as a function of the standardised wind speed (m/s) at 10 metre height as
determined within the site averaged over 10 minute periods.
Page 20

Page 21

LOCATION Standardised wind speed at 10 meter height (m/s) within the site 
4 5 6 7 8 9 10 11 12
Myreton  40.0  40.0  40.0  40.0  40.0  40.0  42.2  47.2  52.9 
Clochmacreich  40.0  40.0  40.0  40.0  40.0  43.0  45.2  46.2  45.7 
Kintywaird  40.0  40.0  40.0  40.0  41.0  44.1  46.2  46.7  45.1 
Brambleburn Cottage  40.0  40.0  40.0  40.0  40.0  40.0  42.8  46.6  49.8 
Over Windyhills  40.0  40.0  40.0  40.0  40.0  43.0  45.2  46.2  45.7 
Netherton of Windyhills  40.0  40.0  40.0  40.0  40.0  43.0  45.2  46.2  45.7 
Backies  40.0  40.0  40.0  40.0  40.0  43.0  45.2  46.2  45.7 
Upper Skeith  40.0  40.0  40.0  40.0  40.0  43.0  45.2  46.2  45.7 
Mid Skeith  40.0  40.0  40.0  40.0  40.0  43.0  45.2  46.2  45.7 
Little Skeith  40.0  40.0  40.0  40.0  41.0  44.1  46.2  46.7  45.1 
Langley  40.0  40.0  40.0  40.0  40.0  40.0  42.8  46.6  49.8 
Croylet  40.0  40.0  40.0  40.0  40.0  40.0  42.8  46.6  49.8 
Table 3: Coordinate locations of the properties listed in Tables 1 and 2. 
Myreton  349628 856425
Clochmacreich  349452 858035
Kintywaird  351482 859347
Brambleburn Cottage  350969 856448
Over Windyhills  349264 856733
Netherton of Windyhills  349308 857282
Backies  349762 858923
Upper Skeith  349992 859109
Mid Skeith  350327 859293
Little Skeith  350937 859394
Langley  351560 856770
Croylet  350359 856276 
Note to Table 3: The geographical coordinate references are provided for the
purpose of identifying the general location of dwellings to which a given set of
noise limits applies. 
Reason: To ensure an acceptable form of development and in order to protect the
amenity of any nearby residents from any undue noise and disturbance. 
16.  The wind farm operator shall employ an independent consultant, approved by the
Planning Authority, to measure, at the operator’s own expense, the level of noise
emissions from the wind turbines within the first year of the operation of the
turbines, and every two years thereafter, unless and until the Planning Authority
extend the period or determine that continued compliance monitoring is no longer
required. The measurement procedures, which may include filtering data
according to wind direction, shall be agreed with the Planning Authority prior to
Page 21

Page 22

commencement. The results of any measurement exercise shall be forwarded to
the Planning Authority as soon as practicable after the completion of the
monitoring exercise. Unless otherwise agreed with the Planning Authority the
turbines shall be switched off during part of the monitoring period to permit reliable
background noise level data to be determined at the range of wind speeds from 4
m/s to 12 m/s. 
Reason: To ensure an acceptable form of development and in order to protect the
amenity of any nearby residents from any undue noise and disturbance. 
17.  Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive dwelling
shall be permitted between 0700 – 1900 hours, Monday to Friday and 0700 –
1300 hours on Saturdays only, and at no other times out with these permitted
hours (including national public and bank holidays) shall construction works be
undertaken except where previously agreed in writing with the Council, as
Planning Authority and where so demonstrated that operational constraints
require limited periods of construction works to be undertaken out with the
permitted/stated hours of working. 
Reason: To ensure an acceptable form of development and in order to protect the
amenity of any nearby residents from any undue noise and disturbance. 
18.  A shadow flicker impact control module shall be installed prior to operation to both
turbines 1 and 5 at the development, and in accordance with the details provided
in Chapter 14.1.12 of the Environmental Statement (Volume1) by Amec Foster
Wheeler and titled “Lurg Hill Wind Farm Environmental Statement”. 
For the sake of clarification, turbines 1 and 5 locations are identified in the
supporting document by Amec Foster Wheeler and titled “Figure 3 Planning
Application Site Layout Plan”. 
Reason: To ensure an acceptable form of development and in order to protect the
amenity of any nearby residents from any undue shadow flicker. 
19.  At the reasonable request of the Planning Authority following a complaint the wind
farm operator shall investigate and instigate appropriate mitigation measures to
minimise the effects of shadow flicker. 
Reason: To ensure an acceptable form of development and in order to protect the
amenity of any nearby residents from any undue shadow flicker. 
20.   Air Traffic Control Radar: No development shall commence unless and until an Air  
Traffic Control Radar Mitigation Scheme to address the impact of the wind
turbines on air safety has been submitted to and approved by the local planning
authority. 
The Air Traffic Control Radar Mitigation Scheme is a scheme designed to mitigate
the impact of the development on the operation of the Primary Surveillance Radar
at RAF Lossiemouth (“the Radar”) and the air traffic control operations of the
Page 22

Page 23

Ministry of Defence (MOD) which is reliant upon the radar. The Air Traffic Control
Radar Mitigation Scheme shall set out the appropriate measures to be
implemented to mitigate the impact of the development on the radar and shall be
in place for the operational life of the development provided the radar remains in
operation. 
No turbines shall become operational unless and until all those measures required
by the approved Air Traffic Control Radar Mitigation Scheme to be implemented
prior to the operation of the turbines have been implemented and the local
planning authority has confirmed this in writing. The development shall thereafter
be operated fully in accordance with the approved Air Traffic Control Radar
Mitigation Scheme. 
Reason: To ensure that the operation of the turbines does not interfere with the
proper operation of the radar systems at RAF Lossiemouth. 
21.  Aviation Lighting: The company shall install MOD accredited 25 candela omni-
directional aviation lighting OR infra-red warning lighting with an optimised flash
pattern of 60 flashes per minute of 200ms to 500ms duration at the highest
practicable point on all turbines. The turbines shall be erected with this lighting
installed and the lighting shall remain operational throughout the duration of the
consent. 
Reason: To give warning of the presence of the turbines in poor visibility or
darkness. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal to extend the operational lifetime of this wind farm development, which
has extant consent and proposes no other physical changes to the development,
accords with the adopted Moray Local Development Plan 2020 and there are no other
material considerations that indicate otherwise. 
List of Informatives: 
1.  The length of the permission: This planning permission will lapse on the
expiration of a period of three years from the date of this decision notice, unless
the development has been started within that period (See section 58(1) of the
Town and Country Planning (Scotland) Act 1997 (as amended)). 
2.  Notice of the start of development: The person carrying out the development
must give advance notice in writing to the planning authority of the date when it is
intended to start. Failure to do so is a breach of planning control. It could result in
the planning authority taking enforcement action (See sections 27A and 123(1) of
the Town and Country Planning (Scotland) Act 1997 (as amended)). 
Page 23

Page 24

3.  Notice of the completion of the development: As soon as possible after it is
finished, the person who completed the development must write to the planning
authority to confirm the position (See section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended)). 
ADDITIONAL NOTES FOR APPLICANT 
The following notes are provided for information including comments received from
consultees: 
The TRANSPORTATION MANAGER, DIRECT SERVICES has commented that: 
Prior to the commencement of deliveries or any construction work, a Section 96
Agreement under the Roads (Scotland) Act 1984 will be required to be approved
between the developer and the roads Authority. This is to ensure that the costs to
repair any damage to the public roads as a result of the construction work traffic
are met by the applicant. 
The scope of the S96 Wear and Tear Agreement must include a condition survey
of the network including the full extent of the agreed construction traffic route(s)
(within Moray) between the site and the ‘A’ class road network. In addition the
wear and tear agreement shall also include condition surveys of all roads
identified as ‘unsuitable’ which must be agreed with the Roads Authority. On the
basis of the current indicative access routes the following initial routes are
identified as ‘unsuitable’ for use by construction traffic.  
C7L Craibstone - Fordyce Road 
U57al Oathillock Road 
U57l Main Road/Kirkton Road 
C62L Clune – Ardiecow 
A programme of monitoring for all routes identified within the CTMP during
construction shall be included. 
Proposals for the management of abnormal indivisible loads to be approved, must
also include measures to ensure the safety of non vehicular road users. 
It is not acceptable to over run central refuge / splitter islands, they are not
constructed to take vehicle loadings. Proposals submitted must show how this will
be managed during deliveries. It is also not appropriate to remove signing for the
duration of the abnormal loads therefore confirmation of how signs will be
managed during the delivery phase needs to be agreed.  
Transport Scotland must be consulted with respect to all deliveries proposed via
the Trunk Road. The neighbouring Local Authorities, through which the delivery
route may pass, Highland/Aberdeenshire/Aberdeen City, must also be consulted. 
Planning consent does not carry with it the right to construct a new road or any
part of a road. In accordance with Section 21 of the Roads (Scotland) Act 1984
Construction Consent for new roads (includes passing places, modified junctions
Page 24

Page 25

and footpaths) that will form part of the public road will be required. Advice on this
matter can be obtained by emailing transport.develop@moray.gov.uk  and
reference to the following pages on the Council web site. 
Checklist: http://www.moray.gov.uk/downloads/file68812.pdf 
RCC: http://www.moray.gov.uk/moray_standard/page_65638.html 
Specification http://www.moray.gov.uk/downloads/file68813.pdf 
The applicant is obliged to apply for a road opening permit in accordance with
Section 85 of the Roads (Scotland) Act 1984. Advice on this matter can be
obtained by emailing roads.permits@moray.gov.uk  and reference to the following
page on the Council web site. 
Road Opening: http://www.moray.gov.uk/moray_standard/page_79860.html  
Public utility apparatus may be affected by this proposal. Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
If required, street furniture will need to be repositioned at the expense of the
developer. In addition any existing roadside ditch may require a pipe or culvert.
Advice on these matters can be obtained by emailing road.maint@moray.gov.uk  
The applicants shall be responsible for any necessary diversion of any utilities or
drainage present at the locations where works are to be undertaken. 
The applicants shall meet all costs of improvements to the road infrastructure,
which are required as a result of the development. 
The applicants shall meet all costs of removal and re-erection of road signage,
which are required as a result of the delivery of the abnormal loads. 
The applicants shall meet all costs of diverting any footpath or cycleway during the
construction period, including signage. 
The applicants shall free and relieve the Roads Authority from any claims arising
out of his operations on the road or extension to the road. 
No retaining structures or embankments shall be constructed along the edge of
the road, whether retaining the public road or ground adjoining the public road
without prior consultation and agreement of the Roads Authority. 
Bridges and Structures - The developer must contact Neil Fotheringham, Senior
Engineer Moray Council Consultancy to discuss the proposals. 
Traffic Management Plan - The developer must contact the Senior Engineer,
Traffic Section at Moray Council HQ, Elgin – Tel (01343) 563 3780 to discuss the
proposals. 
Page 25

Page 26

The BUILDING STANDARDS MANAGER has commented that: 
A Building Warrant is required for the control building. 
MORAY FLOOD RISK MANAGEMENT has commented that: 
See consultation response dated 13th October 2017. 
The MORAY ACCESS MANAGER has commented that:  
Public access should be managed during construction in the interests of public
safety; during construction tracks can be closed for public access for minimal
periods providing clear signage is erected. 
TRANSPORT SCOTLAND, has commented that: 
The applicant should be informed that the granting of planning consent does not
carry with it the right to carry out works within the trunk round boundary and that
permission must be granted by Transport Scotland Trunk Road and Bus
Operations. Where any works are required on the trunk road, contact details are
provided on Transport Scotland’s response to the planning authority which is
available on the Council’s planning portal. 
Trunk road modification works shall, in all respects, comply with the Design
Manual for Roads and Bridges and the Specification for Highway Works published
by HMSO. The developer shall issue a certificate to that effect, signed by the
design organisation.  
Trunk road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation. 
The Lurg Hill Wind Farm Access Study (June 2017) submitted in support of this
application has not assessed the routing of AIL movements on the A9 / A96 from
the Port of Inverness to Fochabers on the understanding that this part of the route
forms part a recognised AIL route. However, to ensure that this route can
accommodate AIL movements specific to this site, Transport Scotland would seek
further clarification from the applicant on any potential pinch points. 
In addition to this, the study identifies a pinch point at the A96 / A95 junction
outside Keith. However, this would not appear to have been considered further as
part of the 'Preferred Route Assessment'. If Option 3 is taken forward as the
preferred route, Transport Scotland will require more detailed consideration of this
pinch point and on the suitability of the A96 / A97 junction to accommodate AIL
movements in the form of a swept path analysis. 
SCOTTISH NATURAL HERITAGE has commented that: 
See consultation response dated 1st November 2017. 
Page 26

Page 27

SCOTTISH ENVIRONMENTAL PROTECTION AGENCY has commented that: 
See consultation responses dated 6th November 2017, 9th January 2018, and
21st February 2018. 
SCOTTISH WATER has commented that: 
See consultation response dated 15th March 2018. 
FORESTRY COMMISSION SCOTLAND has commented that: 
The submitted Compensatory replanting specification and plan revised 3rd March
2018 addresses the requirements for compensatory planting & the proposals put
forward within the plan for location & species are acceptable. 
The RSPB SCOTLAND has commented that: 
We would recommend, as proposed within the Environmental Statement (Section
13.7.1 of the ES, paragraph 313 refers), that a goshawk breeding survey is carried
out prior to construction or felling. We would be supportive of felling taking place
out with the bird breeding season, to prevent the potential disturbance to
Schedule 1 species. 
There are a number of similar sized developments in this area. Post-construction
monitoring linked to some form of cumulative impact assessment would assist our
understanding of potential issues connected to the build up of turbines on birds.
This in turn would better inform our responses to such proposals. SNH have
produced guidance on assessing the cumulative impact on birds, which can be
found at http://www.snh.gov.uk/docs/A675503.pdf 
THE ENVIRONMENTAL HEALTH MANAGER, DEVELOPMENT SERVICES has
commented that: 
Guidance Notes for Noise Condition 16 (above). 
These notes are to be read with and form part of the noise condition. They further
explain the condition and specify the methods to be employed in the assessment
of complaints about noise emissions from the wind farm. The rating level at each
integer wind speed is the arithmetic sum of the wind farm noise level as
determined from the best-fit curve described in Guidance Note 2 of these
Guidance Notes and any tonal penalty applied in accordance with Guidance Note
3. Reference to ETSU-R-97 refers to the publication entitled “The Assessment and
Rating of Noise from Wind Farms” (1997) published by the Energy Technology
Support Unit (ETSU) for the Department of Trade and Industry (DTI). 
Guidance Note 1 
(a)  Values of the LA90,10 minute noise statistic should be measured at the
complainant’s property, using a sound level meter of EN 60651/BS EN
Page 27

Page 28

60804 Type 1, or BS EN 61672 Class 1 quality (or the equivalent UK
adopted standard in force at the time of the measurements) set to measure
using the fast time weighted response as specified in BS EN 60651/BS EN
60804 or BS EN 61672-1 (or the equivalent UK adopted standard in force at
the time of the measurements). This should be calibrated in accordance with
the procedure specified in BS 4142: 1997 (or the equivalent UK adopted
standard in force at the time of the measurements). Measurements shall be
undertaken in such a manner to enable a tonal penalty to be applied in
accordance with Guidance Note 3. 
(b)  The microphone should be mounted at 1.2 – 1.5 metres above ground level,
fitted with a two-layer windshield or suitable equivalent approved in writing by
the Local Planning Authority, and placed outside the complainant’s dwelling.
Measurements should be made in “free field” conditions. To achieve this, the
microphone should be placed at least 3.5 metres away from the building
facade or any reflecting surface except the ground at the approved
measurement location. In the event that the consent of the complainant for
access to his or her property to undertake compliance measurements is
withheld, the wind farm operator shall submit for the written approval of the
Local Planning Authority details of the proposed alternative representative
measurement location prior to the commencement of measurements and the
measurements shall be undertaken at the approved alternative
representative measurement location. 
(c)  The LA90 10 minute measurements should be synchronised with
measurements of the 10-minute arithmetic mean wind and operational data
logged in accordance with Guidance Note 1(d), including the power
generation data from the turbine control systems of the wind farm. 
(d)  To enable compliance with the conditions to be evaluated, the wind farm
operator shall continuously log arithmetic mean wind speed in metres per
second and wind direction in degrees from north at hub height for each
turbine and arithmetic mean power generated by each turbine, all in
successive 10-minute periods. Unless an alternative procedure is previously
agreed in writing with the Planning Authority, this hub height wind speed,
averaged across all operating wind turbines, shall be used as the basis for
the analysis. All 10 minute arithmetic average mean wind speed data
measured at hub height shall be ‘standardised’ to a reference height of 10
metres as described in ETSU-R-97 at page 120 using a reference roughness
length of 0.05 metres . It is this standardised 10 metre height wind speed
data, which is correlated with the noise measurements determined as valid in
accordance with Guidance Note 2, such correlation to be undertaken in the
manner described in Guidance Note 2. All 10-minute periods shall
commence on the hour and in 10- minute increments thereafter. 
(e)  Data provided to the Local Planning Authority in accordance with the noise
condition shall be provided in comma separated values in electronic format. 
(f)  A data logging rain gauge shall be installed in the course of the assessment
of the levels of noise emissions. The gauge shall record over successive 10-
Page 28

Page 29

minute periods synchronised with the periods of data recorded in accordance
with Note 1(d). 
Guidance Note 2 
(a)  The noise measurements shall be made so as to provide not less than 20
valid data points as defined in Guidance Note 2 
(b)  Valid data points are those measured in the conditions specified in the
agreed written protocol under paragraph (c) of the noise condition, but
excluding any periods of rainfall measured in the vicinity of the sound level
meter. Rainfall shall be assessed by use of a rain gauge that shall log the
occurrence of rainfall in each 10 minute period concurrent with the
measurement periods set out in Guidance Note 1. In specifying such
conditions the Local Planning Authority shall have regard to those conditions
which prevailed during times when the complainant alleges there was
disturbance due to noise or which are considered likely to result in a breach
of the limits. 
(c)  For those data points considered valid in accordance with Guidance Note
2(b), values of the LA90,10 minute noise measurements and corresponding
values of the 10- minute wind speed, as derived from the standardised ten
metre height wind speed averaged across all operating wind turbines using
the procedure specified in Guidance Note 1(d), shall be plotted on an XY
chart with noise level on the Y-axis and the standardised mean wind speed
on the X-axis. A least squares, “best fit” curve of an order deemed
appropriate by the independent consultant (but which may not be higher than
a fourth order) should be fitted to the data points and define the wind farm
noise level at each integer speed. 
Guidance Note 3 
(a) Where, in accordance with the approved assessment protocol under
paragraph (c) of the noise condition, noise emissions at the location or
locations where compliance measurements are being undertaken contain or
are likely to contain a tonal component, a tonal penalty is to be calculated
and applied using the following rating procedure. 
(b) For each 10 minute interval for which LA90,10 minute data have been
determined as valid in accordance with Guidance Note 2 a tonal assessment
shall be performed on noise emissions during 2 minutes of each 10 minute
period. The 2 minute periods should be spaced at 10 minute intervals
provided that uninterrupted uncorrupted data are available (“the standard
procedure”). 
Where uncorrupted data are not available, the first available uninterrupted
clean 2 minute period out of the affected overall 10 minute period shall be
selected. Any such deviations from the standard procedure, as described in
Section 2.1 on pages 104-109 of ETSU-R-97, shall be reported. 
Page 29

Page 30

(c) For each of the 2 minute samples the tone level above or below audibility
shall be calculated by comparison with the audibility criterion given in Section
2.1 on pages 104 to 109 of ETSU-R-97.  
(d)   The tone level above audibility shall be plotted against wind speed for each
of the 2 minute samples. Samples for which the tones were below the
audibility criterion or no tone was identified, a value of zero audibility shall be
used. 
(e)   A least squares “best fit” linear regression line shall then be performed to
establish the average tone level above audibility for each integer wind speed
derived from the value of the “best fit” line at each integer wind speed. If
there is no apparent trend with wind speed then a simple arithmetic mean
shall be used. This process shall be repeated for each integer wind speed for
which there is an assessment of overall levels in Guidance Note 2. 
(f)   The tonal penalty is derived from the margin above audibility of the tone
according to the figure below. 
Guidance Note 4 
(a)  If a tonal penalty is to be applied in accordance with Guidance Note 3 the
rating level of the turbine noise at each wind speed is the arithmetic sum of
the measured noise level as determined from the best fit curve described in
Guidance Note 2 and the penalty for tonal noise as derived in accordance
with Guidance Note 3 at each integer wind speed within the range specified
by the Local Planning Authority in its written protocol under paragraph (c) of
the noise condition. 
(b)  If no tonal penalty is to be applied then the rating level of the turbine noise at
each wind speed is equal to the measured noise level as determined from
the best fit curve described in Guidance Note 2. 
Page 30

Page 31

(c)  In the event that the rating level is above the limit(s) set out in the Tables
attached to the noise conditions or the noise limits for a complainant’s
dwelling approved in accordance with paragraph (d) of the noise condition,
the independent consultant shall undertake a further assessment of the
rating level to correct for background noise so that the rating level relates to
wind turbine noise emission only. 
(d)  The wind farm operator shall ensure that all the wind turbines in the
development are turned off for such period as the independent consultant
requires to undertake the further assessment. The further assessment shall
be undertaken in accordance with the following steps: 
(e)  Repeating the steps in Guidance Note 2, with the wind farm switched off,
and determining the background noise (L3) at each integer wind speed
within the range requested by the Local Planning Authority in its written
request under paragraph (b) and the approved protocol under paragraph (c)
of the noise condition. 
(f)  The wind farm noise (L1) at this speed shall then be calculated as follows
where L2 is the measured level with turbines running but without the addition
of any tonal penalty: 
(g)  The rating level shall be re-calculated by adding arithmetically the tonal
penalty (if any is applied in accordance with Note 3) to the derived wind farm
noise L1 at that integer wind speed. 
(h)  If the rating level after adjustment for background noise contribution and
adjustment for tonal penalty (if required in accordance with note 3 above) at
any integer wind speed lies at or below the values set out in the Tables
attached to the conditions or at or below the noise limits approved by the
Local Planning Authority for a complainant’s dwelling in accordance with
paragraph (d) of the noise condition then no further action is necessary. If
the rating level at any integer wind speed exceeds the values set out in the
Tables attached to the conditions or the noise limits approved by the Local
Planning Authority for a complainant’s dwelling in accordance with paragraph
(d) of the noise condition then the development fails to comply with the
conditions. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version
No.
Title/Description 
FIGURE 1 Location Plan 
Page 31

Page 32

Page 32

Page 33

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Lurg Hill
Deskford
Planning Application Ref Number: 
22/00339/APP
Location Plan
Applicant Name: 
Vento Ludens Ltd
Page 33

Page 34

Site Location
Page 34

Page 35

16/01664/APP
Page 35

Page 36

Photo 1
16/
Page 36

Page 37

Photo 2
16/
Page 37

Page 38

Photo 3
16/
Page 38

Page 39

PLANNING APPLICATION: 22/00339/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.  THE PROPOSAL 
   This is an application under section 42 of the Planning Act, which seeks to
vary the terms of condition 1 of planning permission 17/01198/EIA to
extend the operational lifetime of the consented five turbine wind farm at
Lurg Hill (Planning Appeal Reference:PPA-300-2052) from 30 years to 35
years. 
   The consented wind farm comprises the following: 
   5 turbines, 130m high (to blade tip) with 85m high hub, 90m rotor
diameter (max. 45m blade length) and a rated capacity of up to 3MW
each (total 15MW).  
   Reinforced concrete foundation pads for each turbine to sit on and
an area of hardstanding alongside each turbine; 
   A substation compound, approx. 30m x 20m enclosed by security
fencing, with 8 parking spaces, an external transformer/generator
compound area, and a single-storey substation building, approx.
10m x 15m x 6m with rendered walls and a slate (or equivalent)
pitched roof over, to house switchgear and other control systems
plus staff welfare facilities.
   Approximately 3.43km of access track would be provided on the site
for the construction and operation of the proposed development, of
which 760m would be new tracks and 2.67km would be upgraded;
and
   A temporary construction compound, approx. 50m x 50m containing
temporary site office and staff welfare facilities, stores, parking area,
material laydown/storage, refuelling/oil and generator.
   The application is supported by a Supporting Statement and copy of
ANNEX A: Schedule of Planning Conditions, from Planning Appeal
Decision Notice PPA-300-2052. 
2.  THE SITE 
   The turbines would straddle the northern flank of Lurg Hill, located
approximately midway between Cullen and Keith. 
   The B9018 Keith to Cullen road runs north/south approx. 1km to the west
of the site. The site partially borders Aberdeenshire Council area to the
northeast. 
   The total site area covers approximately 137 hectares and comprises
plantation woodland (parts of which have been felled/cleared), heathland
and tracks, with 2.648ha land take for turbines, and associated
infrastructure. 
Page 39

Page 40

   The site would be accessed from the north via an existing access track (to
be upgraded) which joins onto the nearby C4L (Bogmuchals - Berryhillock
Road); the access junction onto the C4L is to be upgraded and widened.
   The site is not subject to any international, national, regional or local
landscape, built environment or nature conservation designations, and
there are no known archaeological assets within the site. 
   The site lies within the Moray Onshore Wind Energy non-statutory
guidance (2020) 'Area of Search' for medium turbines (50m to 80m) but
outwith the search area for larger wind turbines. 
   The 'landmark hills' of Bin of Cullen and Knock Hill lie 6km and 4km to the
north-west and south-east respectively. 
3. HISTORY 
For the site: 
22/00563/APP – Application for the erection of 3 Wind Turbines (at max height
149.9m to blade tip) control building and substation and formation of access
tracks at Lurg Hill, Deskford. This is an alternative scheme to the approved 5
wind turbine development (17/01198/EIA) and is currently under consideration. 
17/01198/EIA – Erection of 5 wind turbines (at max height 130m to blade tip)
control building and substation and formation of access tracks (including turning
heads) hardstanding temporary construction compound and associated works
and infrastructure at Lurg Hill, Deskford - approved/allowed at appeal by the
Planning and Environmental Appeals Division (DPEA) on 25 February 2019. 
15/01340/SCO - Scoping Opinion issued for 6 turbines with tip height up to
130m at Lurg Hill, Deskford - response confirmed that EIA was required and
environmental issues and potential impacts to be taken into account were
identified. 
For the area: 
21/00484/APP – Vary condition 1 attached to planning permission
16/01657/APP to increase the operational life period of Aultmore Wind Farm
(13 wind turbines (12 x 110m high, and 1 x 90m high) from 27 to 30 years at
Aultmore Forest, Drybridge. This proposal lies 3.4km to the west of the
application site and has yet to be constructed. 
16/01657/APP- Vary conditions 1, 18 and 24 of planning permission
07/02375/EIA relating to the Aultmore Wind Farm approved 28/02/17. This
consent was granted for a 5 year period and was extended by 21/00484/APP
above. This proposal lies 3.4km to the west of the application site. 
13/02057/S36 - Erection of 16 wind turbines (125m to blade tip) at Hill of Towie
Windfarm, known as Hill of Towie II. Located immediately south of the existing
Hill of Towie wind farm, this proposal was subject of a Public Inquiry in
September 2015 (following objection by the Moray Council to the Scottish
Government Energy Consents and Deployment Unit (lodged in 2014)), and
Page 40

Page 41

subsequently approved in June 2017. This wind farm has yet to be constructed
and will lie 20km to the south-west of the current proposal. 
12/01165/APP - Erection of 1 no. turbine (80m to tip) at Edingight, Grange,
Keith - approval/allowed on appeal by DPEA January 2013. This lies 2.1km to
the south-east of the application site and is operational. 
11/01384/APP - Erection of 1 no. wind turbine (56m rotor diameter) with a
maximum height of up to 78m and ancillary infrastructure at Followsters,
Newmill - approved February 2012. Permission to vary the turbine model
(revised nacelle design) was subsequently approved under 13/00479/APP in
May 2013. This lies 9.2km south-west of the application site and is operational. 
10/02092/EIA - Formation of wind farm comprising 6 wind turbines (125m in
height, total capacity up to 21MW) and associated infrastructure including
access tracks, control building housing switchgear equipment and buried
cables at Edintore, Keith - approved/allowed at appeal by DPEA in 2012. These
are located approx. 15km to the southwest of the site and are operational. 
09/00763/FUL - Erection of 2 x 2.3 megawatt wind turbines (92.4m to tip) and
associated works at Netherton of Windyhills, Grange Crossroads - approved
October 2010. These are located 1.4km south-west of the current application
site and are operational. 
09/00247/FUL - Install two 800kw wind turbines (79m to tip) at Myreton,
Crossroads - approved/allowed following review by Local Review Body July
2010. These are located 1.5km to the south-west of the application site and are
operational. 
07/01102/FUL - Install a 50kw wind turbine with a hub height of 50m and blade
diameter of 48m (79.6m to tip) at Myreton, Crossroads - approved February
2008. This lies 1.4km to the southwest of the application site and is operational. 
07/02375/EIA - Construction, operation and decommission of a wind farm
comprising 13 wind turbines (12 x 110m high, and 1 x 90m high) and other
ancillary development at Aultmore Forest, Drybridge - approved 27.02.2014
and subsequently extended on 28.02.2017 under application 16/01657/APP to
vary conditions 1, 18 and 24 of planning permission 07/02375/EIA (extension to
time limit and operational period, and noise levels). This proposal lies 3.4km to
the west of the application site and has yet to be constructed. 
04/02472/FUL - Construct 1 no. wind turbine (70m to tip height) at Balnamoon,
Crossroads, Keith - approved/allowed on appeal by Scottish Ministers October
2005. This lies 3.5km to the south-west and is operational. 
02/02099/EIA - Erection of 21 wind turbines (100m to tip) and 2 wind masts at
Hills of Towie, Knockan and McHattie's Cairn, Drummuir - approved/allowed on
appeal in 2005. These lie 18km to the southwest and have been erected and
are operational. 
Page 41

Page 42

Aberdeenshire turbines: 
APP/2009/3565 - Erection of 2 no. wind turbines (99.5m to tip) at Land at
Muirake, Cornhill, Banff - approved 2010. These are located 5km to the east
and are erected and operational. 
APP/2012/2786 - Erection of 1 no wind turbine (79m to tip) at Land at Braeside,
Fordyce, Banff - approved August 2012. This lies 3.5km to the north-east and
has yet to be constructed. 
APP/2003/1692 - Erection of 7 Wind Turbines at Boyndie Airfield, Banff -
approved July 2004. These lie 12km to the north-east and is operational. 
4. POLICY - SEE APPENDIX 
5. ADVERTISEMENTS 
5.1  Advertised for the purposes of Neighbour Notification and as Schedule 3 (The
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013) development. 
6.  CONSULTATIONS 
Strategic Planning & Development - No objections to the proposed extension
of the operational life period of Lurg Hill Wind Farm from 30 to 35 years. On the
basis that the proposal is solely to vary Condition 1 (duration of permission) of
planning permission 17/01198/EIA, a full assessment of the merits of the wind
farm against MLDP 2020 policies has not been undertaken as planning
permission remains extant and no physical changes to the development are
proposed. 
Transportation Manager – No objection, application for an extension of time
only. 
Environmental Health - No objections. The extension of the operational time
period does not materially affect this Section’s recommended approval of the
application. It should, however, be noted that the consented application has
conditions to control the construction phase for any impacts (i.e. conditions 6
requires the submission of Construction Environmental Management Plan and
condition 17 controls times of construction), as well as operational wind farm
noise testing against limits, the need to maintain compliance with noise limits
throughout the lifetime of the development, and shadow flicker mitigation, as
covered by conditions 15, 16, 18 and 19. It can also be noted that Scottish
Ministers did not attach recommended conditions from this Section on
amplitude modulation noise. 
Environmental Health, Contaminated Land – No objection.   
Environmental Health, Private Water Supplies – No objection.
Page 42

Page 43

Flood Risk Management – No objection subject to previous comments
included on the original response (17/01198/EIA) from Flood Risk Management
being retained as conditions. 
Aberdeenshire Council Archaeology Service - No objection. 
Developer Obligations – No developer obligations will be sought for the above
proposal. 
Scottish Ministers - No response at time of report.  
SEPA - No objection to this application. We note that this consultation relates
only to the modification of Condition 1 of planning permission (17/01198/EIA /
PPA-300-2052) granting permission for "a period of 30 years from the date
when electricity if first exported from any wind turbine within the development to
the electricity network (First Export Date)" to granting a permission for a period
of 35 year. 
NatureScot – No comments to make. 
Historic Environment Scotland - No response at time of report. 
MOD – No objection. 
Aberdeenshire Council - It is noted that Aberdeenshire Council did not object
to 17/01198/EIA / PPA-300-2052. The proposal to alter the operational life span
of the development from 30 years from first energy export to permission for 35
years will not have a significant impact upon the Aberdeenshire area and as
such, Aberdeenshire Council has no objection to the proposed time variation. 
Transport Scotland - Does not propose to advise against the granting of
permission. 
Scottish Forestry - As there are no material changes in the treatment of
woodlands within this application and no amendments to the current conditions
relating to the Control of Woodlands Removal Policy (COWRP) we have no
additional comments at his point. 
RSPB Scotland - No comments to make. 
Cullen and Deskford Community Council - No response at time of report. 
Strathisla Community Council - No response at time of report. 
Scottish Water – No response at time of report. 
Ofcom - No response at time of report. 
Scottish and Southern Energy - No response received at time of report. 
Page 43

Page 44

Joint Radio Company (JRC) Windfarms – No fixed links affected (for radio
infrastructure operated by Scottish Hydro (Scottish & Southern Energy) and
Scotia Gas Networks). 
Atkins Global – No objection. 
Aberdeen International Airport Limited – No objection. 
NATS Safeguarding – No safeguarding objection. 
Civil Aviation Authority - No response at time of report. 
7.  OBJECTIONS-REPRESENTATIONS 
None. 
8.  OBSERVATIONS 
8.1  Section 42 of the Town and Country Planning (Scotland) Act 1997 as amended
allows applicants to apply to develop land without compliance with conditions
previous attached to a planning consent. In determining such an application,
the Council, as Planning Authority can only consider the conditions subject to
which planning permission should be granted and may: 
   grant permission unconditionally (i.e. remove the conditions attached to
the planning consent); 
   grant permission conditionally with differing conditions; or 
   refuse the application (i.e. keep the conditions attached to the planning
consent). 
8.2  Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. the adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. 
8.3  The main issues are considered below. 
8.4  Background to the Proposal
As noted from the history above, Planning Permission 17/01198/EIA was
granted on appeal for the five turbine wind farm at Lurg Hill by the DPEA
(Planning Appeal Reference:PPA-300-2052) on 25 February 2019. The current
proposal seeks to extend the operational lifetime (condition 1) of the
development only, and if approved the planning permission would allow the
wind farm to operate for 35 years from the date of first export of electricity. A
Section 42 application effectively creates a new planning permission and the
effect of granting permission for the current application would be to allow an
additional 3 years from the date of determination for the development to
commence. 
8.4.1  The 2017 application was supported by an Environmental Statement in
accordance with the Environmental Impact Assessment (EIA) regulations in
Page 44

Page 45

force at the time. The Environmental Statement (ES) and other supporting
information have been taken into consideration for the current Section 42
application to vary condition 1. For the purposes of the ES and supporting
documents, appendices and other information taken into consideration for the
decision made in 2019, form part of the assessment of the current application.
The current proposal was screened as a Schedule 2 development within the
current (2017) EIA regulations but was found not to require a fresh EIA
submission as it is supported by the previously approved Environmental
Statement, and appropriate mitigation of environmental impacts forms part of
the conditions which are to be reiterated. 
8.4.2  The original application 17/01198/APP was considered under the previous local
development plan and it is therefore necessary to consider the proposal against
current local and national policy. 
8.5  Relationship of proposal to national renewable energy policy/guidance 
International and UK policy frameworks are supportive of renewable energy
proposals which help to facilitate a transition to a low carbon economy. National
Planning Framework (NPF3) for Scotland sets out the spatial strategy for
Scotland's development. NPF3 makes specific reference to onshore wind
energy having an important role in delivering the commitment to a low carbon
energy generation. The draft National Planning Framework 4 sets out that
measures to address climate change and reduction of carbon emissions will be
accelerated. Support for onshore wind energy production is likely to be re-
iterated.   
8.5.1  The Climate Change (Scotland) Act 2009 (the Climate Change Act) has
committed Scotland to becoming carbon-neutral by 2045. This target is legally
binding rather than an ambition and requires to be reflected in the way in which
renewable energy projects are addressed by public bodies when exercising
their functions. Beyond the NPF3 there are a number of considerations relevant
to the planning consideration process, which have been taken into account in
arriving at the below recommendation. They are The Scottish Government’s
Programme for Scotland 2020-21, The Environment Strategy for Scotland,
February 2020, Climate Change (Emissions Reductions Targets) (Scotland) Act
2019, Scottish Government Climate Change Plan (2018), Scottish Government
Onshore Wind Policy Statement 2017 and Scottish Energy Strategy (2017).
These highlight the need to reduce carbon emissions (for which wind energy
will play key a part) but do qualify this with the need to protect landscapes, built
and natural heritage, residents and other interests. 
8.5.2  The commitment to the creation of a low carbon place is reiterated in Scottish
Planning Policy. The applicant’s Supporting Statement sets out that national
policy is significant and supportive of this application to extend the life of the
Lurg Hill Wind Farm development, which will provide renewable energy for
additional years, and contribute to national and regional renewable energy
production and climate change targets. 
8.5.3  Scottish Planning Policy (SPP) requires that “planning should direct the right
development to the right place”, which is an important issue in this proposal.
The policy principles set out for “Delivering Heat and Electricity” in SPP include; 
Page 45

Page 46

   Support the transformational change to a low carbon economy, consistent
with national objectives and targets; 
   Support the development of a diverse range of electricity generation from
renewable energy technologies - including the expansion of renewable
energy generation capacity and the development of heat networks; 
   Guide developments to appropriate locations and advise on the issues
that will be taken into account when specific proposals are being
assessed. 
8.5.4  SPP requires planning authorities to set out in the development plan a spatial
framework identifying those areas that are likely to be most appropriate for
onshore wind farms as a guide for developers and communities, following a set
methodology (para 161). This has been done through the spatial framework
included within the Moray Local Development Plan 2020. This is a broad-brush
approach required to comply with Scottish Planning Policy and covers
approximately 40% of the Moray Local Development Plan Area. The proposed
site is located within an area with potential for wind farm development of
turbines over 35 metres to tip height, with no upper height limit identified. SPP
(para 162) recognises the limitations of the strategic spatial framework and
further requires that local development planning authorities should identify
where there is strategic capacity for wind farms and areas with the greatest
potential for wind development. The Moray Onshore Wind Energy (MOWE)
Non-Statutory Guidance 2020 identifies such areas. The application site is
within an area of greatest potential for medium typologies (50-80m). 
8.5.5  The detailed mapping of constraints and guidance on areas with greatest
potential is set out in the Moray Onshore Wind Energy Guidance 2020
(MOWE). The 2020 MOWE and Moray Wind Energy Landscape Capacity
Study 2017 are currently non statutory guidance and are under review, and
likely to become a sensitivity study in line with NatureScot guidance. They still
do however represent the most detailed and up to date guidance on wind
energy landscape capacity in Moray and remain material considerations for
assessment purposes.   
8.6  MOWE Non-Statutory Guidance 2020 and Moray Wind Energy Landscape
Capacity Study 2017 
The MOWE Non-Statutory Guidance and the Landscape Capacity Study are
material considerations for development management purposes. Incorporating
the outcomes from the Landscape Capacity Study, the Guidance identifies five
typologies of wind turbine and highlights that there is very limited scope to
accommodate further large scale wind turbine developments in Moray in
landscape and visual terms. The consented turbines at this site at 130m high
are classed as ‘Large’ typology turbines (80m to 130m). 
8.6.1  The proposed development is located within the Broad Forested Hills within
Upland Farmland (8a) landscape character type (LCT) as defined in MOWE
and Landscape Capacity Study. LCT8a is assessed in the study as having a
High-Medium sensitivity to the large typology (80-130m) with very limited scope
to accommodate this scale of turbine. The LCT consists predominantly of
broader forested hills and upland plateau. The study concludes that turbines
towards the lower height band of this typology (less than 100m to tip) would
minimise effects on adjacent settled landscapes and that turbines should be set
Page 46

Page 47

well back into the interior of more extensive areas of upland plateau to minimise
intrusion on adjacent settled landscapes and to ensure sufficient separation. It
also highlights that potential cumulative effects are a major constraint to turbine
capacity in this landscape character type. 
8.7  Compliance with Renewable Energy Policy DP9  
(PP1, PP2, PP3, DP1, DP9, EP1, EP2, EP7, EP8, EP11, EP12, EP13, EP14,
EP15 and MOWE) 
National planning policy and guidance supports wind energy developments.
Since the wind farm was approved at Lurg Hill in 2019 the local development
plan has changed with adoption of the MLDP 2020.  In considering the current
proposal to extend the operational lifetime of the development regard should be
had to the extent to which the proposal continues to comply with the
development plan, as established by the DPEA decision. 
8.7.1  Policy DP9 Renewal Energy is the principle policy against which the application
is to be determined; this includes the requirement for proposals to comply with
all other relevant policies of the development plan. The policy requires
renewable energy proposals to address unacceptable impacts in relation to
landscape and visual impacts, noise, air quality, electromagnetic disturbance,
the water environment, carbon rich soils and peat, woodland and forestry, traffic
both during construction and operation, impact on tourism and recreational
interests. For wind farms the policy specifically requires compliance with the
spatial framework, and site specific consideration informed by the Landscape
Character Study, impacts on communities including through issues such as
shadow flicker, aviation and aviation defence issues, cumulative issues and
decommissioning and restoration. 
8.7.2  In terms of landscape and visual impact, policy DP9 and the MOWE is
supported by the Moray Wind Energy Landscape Capacity Study dated 2017.
This Study informed consideration of the previous application for the wind farm
and is equally applicable to the current submission. As already noted from the
site history, despite being refused by the Council the application was allowed
on appeal by the DPEA on the grounds that it complied with development plan
policy and guidance, and would not result in unacceptable visual, landscape,
cumulative or residential amenity impacts (due to its siting, design, and with
mitigation and planning conditions). As such the principle of the development in
this location has already been established by this consent, and under Section
42 of the Planning Act consideration therefore focuses solely on the question of
the conditions subject to which the planning permission should be granted and
the difference between the existing permission and the current proposal. 
8.7.3  There are no changes to the proposal in terms of the layout, height or number
of turbines proposed; the impacts of the development will therefore be the
same as those associated with the previous development. During consideration
of the original application various impacts were identified/assessed in terms of
noise, shadow flicker, impacts on the water environment, forestry, traffic impact,
ecology and aviation safety which require mitigation through adherence to
planning conditions. 
8.7.4  The granting of a Section 42 application has the effect of creating a new
planning consent, therefore these conditions shall be reiterated to ensure that
Page 47

Page 48

all mitigation measures remain in place. These include amongst others the
submission/approval of details regarding decommissioning, site restoration and
a financial bond, final designs (make and model) of the turbines, sub-station
details, drainage infrastructure, pre-commencement ecological surveys, private
water supply mitigation, a Construction Environmental Management Plan and
pollution prevention plan, compensatory planting, transport and access matters,
noise emissions, construction works hours, shadow flicker, an Air Traffic
Control Radar Mitigation Scheme and aviation lighting. 
8.7.5  Consultees have raised no concerns in relation to these matters subject to the
re-imposition of the conditions insofar as they relate to their interests. 
8.7.6  From the above considerations, subject to the conditions and mitigation
measures identified, the proposal would accord with the requirements of policy
DP9 and associated relevant policies as it would comply with policies to
safeguard and enhance the built and natural environment and would
avoid/address any unacceptable significant adverse impacts. 
8.8  Operational Lifetime of the Development 
The purpose of the current application is to increase the operational lifetime of
the development from 30 to 35 years. As noted from the applicant’s Supporting
Statement the request for additional operational life is made due to a desire to
increase and maximise the clean electricity generated from the wind
development as part of the Applicant’s long-term commitment to contributing to
the global Climate Change Emergency and key carbon emission targets, while
balancing the turbines safe and useful operational life. It sets out that, in
general terms, the onshore wind sector is moving towards turbine components
with longer lifespans and is seeking longer term planning permissions in order
to maximise the contribution to tackling Climate Change, maximise energy
generation and commercial viability of energy projects. The applicant’s
submission is considered to be reasonable. 
8.8.1  In the case of the current application the approved development would remain
unchanged but would be present on site for an additional 5 years. Although this
would mean that any associated impacts would persist for a longer period, the
existing proposed mitigation measures would remain in place and ensure that
effects from the extended operation would be no more than those already
identified and addressed in the mitigation for the consented development. It is
noted that no consultees have expressed any concern about the proposed
extension of the operational lifetime of the development. The modest extension
is therefore considered acceptable in this case and would prolong the output of
a renewable energy source. 
Conclusion 
The proposed variation of condition 1 would extend the operational lifetime of
the development from 30 to 35 years. The effect of granting this permission
would be to allow a further 3 years from the date of determination for
development to commence. The recommendation reiterates all other conditions
and informatives of the previous consent 17/01198/EIA/PPA-300-2052, and
relates back to the approved plans and supporting documents approved under
this consent. The extension of operational lifetime will allow the renewable
energy benefits of the scheme to be maximised and increase economic viability
Page 48

Page 49

of the proposed development. The application is therefore recommended for
approval.   
REASON(S) FOR DECISION 
The Council’s reason(s) for making this decision are: - 
The proposal to extend the operational lifetime of this wind farm development,
which has extant consent and proposes no other physical changes to the
development, accords with the adopted Moray Local Development Plan 2020
and there are no other material considerations that indicate otherwise. 
Author/Contact
Officer:
Richard Smith            
Principal Planning Officer
Ext: 01343 563256 
Beverly Smith
Development Management & Building Standards Manager
Page 49

Page 50

Page 50

Page 51

APPENDIX 
POLICY 
Proposed Moray Local Development Plan 2020 
PP1 PLACEMAKING 
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(i) Character and Identity
• Create places that are distinctive to prevent homogenous 'anywhere'
development;
• Provide a number of character areas reflecting site characteristics that
have their own distinctive identity and are clearly distinguishable;
• Provide distinctiveness between and in each character area through a
combination of measures including variation in urban form, street
structure/network, architecture and masonry, accent features (such as
porches), surrounds and detailing, materials (buildings and surfaces),
colour, boundary treatments, hard/soft landscaping and a variety of
approaches to tree species and planting that emphasises the hierarchy of
open spaces and streets within a cohesive design strategy for the whole
development;
• Distinctiveness must be reinforced along main thoroughfares, open
spaces and places where people may congregate such as
shopping/service centres;
• Retain, incorporate and/or respond to relevant elements of the landscape
such as topography and planted features, natural and historic
environment, and propose street naming (in residential developments of
20 units and above, where proposed names are to be submitted with the
planning application) to retain and enhance local associations; 
(ii) Healthier, Safer Environments
Page 51

Page 52

• Designed to prevent crime, fear of crime and anti-social behaviour with
good levels of natural surveillance and security using treatments such as
low boundary walls, dual frontages (principal rooms) and well-lit routes to
encourage social interaction.  Unbroken high boundary treatments such
as wooden fencing and blank gables onto routes, open spaces and
communal areas will not be acceptable. 
• Designed to encourage physical exercise for people of all abilities. 
• Create a distinctive urban form with landmarks, key buildings, vistas,
gateways and public art to provide good orientation and navigation
through the development. 
• Provide a mix of compatible uses, where indicated within settlement
statements, integrated into the fabric of buildings within the street. 
• Prioritise pedestrians and cyclists by providing a permeable movement
framework that incorporates desire lines (including connecting to and
upgrading existing desire lines) and is fully integrated with the surrounding
network to create walkable neighbourhoods and encourage physical
activity. 
• Integrate multi- functional active travel routes, green and open space into
layout and design, to create well connected places that encourage
physical activity, provide attractive spaces for people to interact and to
connect with nature. 
• Create safe streets that influence driver behaviour to reduce vehicle
speeds that are appropriate to the local context such as through shorter
streets, reduced visibility and varying the building line. 
• Provide seating opportunities within streets, paths and open spaces for all
generations and mobility's to interact, participate in activity, and rest and
reflect. 
• Provide for people with mobility problems or a disability to access
buildings, places and open spaces. 
• Create development with public fronts and private backs. 
• Maximise environmental benefits through the orientation of buildings,
streets and open space to maximise the health benefits associated with
solar gain and wind shelter. 
(iii) Housing Mix
• Provide a wide range of well integrated tenures, including a range of
house types and plot sizes for different household sizes, incomes and
generations and meet the affordable and accessible requirements of
policy DP2 Housing.
• All tenures of housing should have equal access to amenities, greenspace
and active travel routes. 
Page 52

Page 53

(iv) Open Spaces/Landscaping
• Provide accessible, multi-functional open space within a clearly defined
hierarchy integrated into the development and connected via an active
travel network of green/blue corridors that are fully incorporated into the
development and to the surrounding area, and meet the requirements of
policy EP5 Open Space and the Open Space Strategy Supplementary
Guidance and Policy EP12 Managing the Water Environment and
Drainage Impact Assessment for New Developments Supplementary
Guidance.
• Landscaped areas must provide seasonal variation, (mix of planting and
colour) including native planting for pollination and food production.
• Landscaping areas that because of their size, shape or location would not
form any useable space or that will not positively contribute to the
character of an area will not contribute to the open space requirements of
Policy EP4 Open Space.
• Semi-mature tree planting and shrubs must be provided along all routes
with the variety of approaches reflecting and accentuating the street
hierarchy.
• Public and private space must be clearly defined.
• Play areas (where identified) must be inclusive, providing equipment so
the facility is for every child/young person regardless of ability and
provided upon completion of 50% of the character area.
• Proposals must provide advance landscaping identified in site
designations and meet the quality requirements of policy EP5 Open
Space.
• Structural landscaping must incorporate countryside style paths (such as
bound or compacted gravel) with waymarkers.
•  Maintenance arrangements for all paths, trees, hedging, shrubs, play/
sports areas, roundabouts and other open/ green spaces and blue/green
corridors must be provided. 
v) Biodiversity
• Create a variety of high quality multi- functional green/blue spaces and
networks that connect people and nature, that include trees, hedges and
planting to enhance biodiversity and support habitats/wildlife and comply
with policy EP2 Biodiversity and Geodiversity and EP5 Open Space.
• A plan detailing how different elements of the development will contribute
to supporting biodiversity must be included in the design statement
submitted with the planning application.
• Integrate green and blue infrastructure such as swales, permeable paving,
SUDS ponds, green roofs and walls and grass/wildflower verges into
streets, parking areas and plots to sustainably address drainage and
flooding issues and enhance biodiversity from the outset of the
development.
• Developments must safeguard and where physically possible extend or
enhance wildlife corridors and green/blue networks and prevent
fragmentation of existing habitats. 
(vi) Parking
• Car parking must not dominate the streetscape to the front or rear of
properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum
Page 53

Page 54

of 50% car parking within the front curtilage or on street, subject to the
visual impact being mitigated by hedging, low stone boundary walls or
other acceptable treatments that enhance the streetscape.
• Provide semi-mature trees and planting within communal private and
public/visitor parking areas and on-street parking at a maximum interval of
4 car parking spaces.
• Secure and covered cycle parking and storage, car sharing spaces and
electric car charging points must be provided in accordance with policy
DP1 Development Principles.
• Parking areas must use a variation in materials to reduce the visual
impact on the streetscene. 
(vii) Street Layout and Detail
• Provide a clear hierarchy of streets reinforced through street width,
building density and street and building design, materials, hard/soft
landscaping and a variety of approaches to tree planting and shrubs.
• Streets and connecting routes should encourage walking and cycling over
use of the private car by providing well connected, safe and appealing
routes.
• Design junctions to prioritise pedestrians, accommodate active travel and
public transport and service/emergency vehicles to reflect the context and
urban form and ensure that the street pattern is not standardised.  
• Dead-end streets/cul-de-sacs will only be selectively permitted such as on
rural edges or where topography, site size, shape or relationship to
adjacent developments prevent an alternative more permeable layout.
These must be short, serving no more than 10 units and provide walking
and cycling through routes to maximise connectivity to the surrounding
area.
• Where a roundabout forms a gateway into, or a landmark within, a town
and/or a development, it must be designed to create a gateway feature or
to contribute positively to the character of the area.
• Design principles for street layouts must be informed by a Street
Engineering Review (SER) and align with Roads Construction Consent
(RCC) to provide certainty that the development will be delivered as per
the planning consent. 
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan. 
(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
PP2  SUSTAINABLE ECONOMIC GROWTH
Development proposals which support the Moray Economic Strategy to deliver
sustainable economic growth will be supported where the quality of the natural and built
Page 54

Page 55

environment is safeguarded, there is a clear locational need and all potential impacts can
be satisfactorily mitigated. 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space. 
ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS. 
ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
Page 55

Page 56

recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use. 
b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment.
Page 56

Page 57

Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
DP9 RENEWABLE ENERGY 
a) All Renewable Energy Proposals
All renewable energy proposals will be considered favourably where they meet the
following criteria: 
i) They are compliant with policies to safeguard and enhance the built and natural
environment; 
ii) They do not result in the permanent loss or permanent damage of prime
agricultural land; 
iii) They avoid or address any unacceptable significant adverse impacts including: 
• Landscape and visual impacts.
• Noise impacts.
• Air quality impacts.
• Electromagnetic disturbance.
• Impact on water environment.
• Impact on carbon rich soils and peat land hydrology.
• Impact on woodland and forestry interests.
• Traffic impact -mitigation during both construction and operation.
• Ecological Impact.
• Impact on tourism and recreational interests. 
In addition to the above criteria, detailed assessment of impact will include
consideration of the extent to which the proposal contributes to renewable energy
generation targets, its effect on greenhouse gas emissions and net economic impact,
including socio-economic benefits such as employment. 
b) Onshore wind turbines
In addition to the assessment of the impacts outlined in part a) above, the following
considerations will apply:
Page 57

Page 58

i) The Spatial Framework
Areas of Significant Protection (Map 2): where the Council will apply significant
protection and proposals may be appropriate in circumstances where any
significant effects on the qualities of these areas can be substantially overcome
by siting, design and other mitigation. 
Areas with Potential (Map 1): where proposals are likely to be acceptable
subject to Detailed Consideration. 
ii) Detailed Consideration 
The proposal will be determined through site specific consideration of the
following on which further guidance will be set out in supplementary guidance
and as informed by the landscape capacity study: 
Landscape and visual impact:
• the landscape is capable of accommodating the development without
unacceptable significant adverse impact on landscape character or visual
amenity.
• the proposal is appropriate to the scale and character of its setting,
respects the main features of the site and the wider environment and
addresses the potential for mitigation. 
Cumulative impact
• unacceptable significant adverse impact from two or more wind energy
developments and the potential for mitigation is addressed. 
Impact on local communities
• the proposal addresses unacceptable significant adverse impact on
communities and local amenity including the impacts of noise, shadow
flicker, visual dominance and the potential for associated mitigation. 
Other
• the proposal addresses unacceptable significant adverse impacts arising
from the location within an area subject to potential aviation and defence
constraints including flight paths and aircraft radar.
• the proposal avoids or adequately resolves other impacts including on the
natural and historic environment, cultural heritage, biodiversity, forest and
woodlands and tourism and recreational interests - core paths, visitor
centres, tourist trails and key scenic routes.
• the proposal addresses any physical site constraints and appropriate
provision for decommissioning and restoration. 
iii) Extensions and Repowering of Existing Wind Farms 
The proposal will be determined through assessment of the details of the
proposal against Part a) and Parts b) (i) and (ii) above.  Detailed assessment of
impact will include consideration of the extent to which:
• the proposal, for extensions, impacts on the existing wind farm(s) setting
and the ability to sit in the landscape on its own should the existing wind
farm be decommissioned before the extension.
• the proposal, for repowering, makes use of existing infrastructure and
resources, where possible, and limits the need for additional footprint.
Page 58

Page 59

c) Biomass
Proposals for the development of commercial biomass will be supported if the
following criteria are met. 
• Applicants must confirm which form of biomass will fuel the plant and if a
mixture of biomass is proposed then what percentage split will be attributed to
each fuel source.
• Proposals must demonstrate that they have taken account of the amount of
supply fuel over the life of the project.
• When considering wood biomass proposals, the scale and location of new
development is appropriate to the volume of local woodfuel available. Sources
of fuel must be identified and must be sustainable.
• The location must have suitable safe access arrangements and be capable of
accommodating the potential transport impacts within the surrounding roads
network.
• A design statement must be submitted, which should include photomontages
from viewpoints agreed by the Council.
• There must be a locational justification for proposals outwith general
employment land designations. The proposed energy use, local heat users and
connectivity of both heat users and electricity networks must be detailed.
Proposals which involve potential or future heat users will not be supported
unless these users can be brought online in conjunction with the operation of
the plant.
• Details of the predicted energy input and output from the plant demonstrating
the plant efficiency and utilisation of heat must be provided.
• Where necessary, appropriate structural landscaping must be provided to
assist the development to integrate sensitively. 
The criteria set out in relation to all renewable energy proposals (part a) must also be
met. 
The Council will consult with Scottish Forestry to help predict potential woodfuel
supply projections in the area. 
d) Heat
Where a heat network exists or is planned, proposals should include infrastructure to
allow connection to that network. 
Where no heat network is present or planned: 
• Proposals should consider the feasibility for the creation of or connection to a
heat network.
• Proposals should safeguard piperuns within the development, to its curtilage,
for future connection to a heat network.
• Proposals should consider the provision of energy centres, or the reservation of
land for an energy centre to facilitate future connection to a heat network. 
Proposals for new development will be compared with the Scotland Heat Map to
identify if it could make use of an existing heat supply or provide excess heat to heat
users.  This will be the case until the Council has concluded work on identifying
where heat networks, heat storage and energy centres exist or would be appropriate
Page 59

Page 60

in the plan area, at which point reference to that work should be made. 
Developments which have a high heat demand are encouraged to co-locate with
sources of heat supply. 
Where heat networks are not viable, proposals should include the use of
microgeneration technologies and heat recovery associated with individual
properties, unless demonstrating this is unnecessary or unviable. 
The criteria set out in relation to all renewable energy proposals (part a) must also be
met. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
Page 60

Page 61

e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. 
Alterations and extensions must be compatible with the character of the
existing building in terms of design, form, choice of materials and positioning
and meet all other relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
Page 61

Page 62

d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2. 
f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
Page 62

Page 63

f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry. 
h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
EP1 NATURAL HERITAGE DESIGNATIONS
a) European Site designations
Development likely to have a significant effect on a European Site and which is not
directly connected with or necessary to the conservation management of that site
must be subject to an appropriate assessment of the implications for its conservation
objectives. Proposals will only be approved where the appropriate assessment has
ascertained that there will be no adverse effect on the integrity of the site. 
In exceptional circumstances, proposals that could affect the integrity of a European
Site may be approved where: 
i) There are no alternative solutions, and
ii) There are imperative reasons of over-riding public interest including those of a
social or economic nature, and
iii) Compensatory measures are provided to ensure that the overall coherence of
the Natura network is protected. 
For European Sites hosting a priority habitat or species (as defined in Article 1 of the
The Conservation (Natural Habitat & c.) Regulations 1994), prior consultation with
the European Commission via Scottish Ministers is required unless the imperative
reasons of overriding public interest relate to human health, public safety or
beneficial consequences of primary importance to the environment. 
b) National designations
Development proposals which will affect a National Park, National Scenic Area
(NSA), Site of Special Scientific Interest (SSSI) or National Nature Reserve will only
be permitted where:
i) The objectives of designation and the overall integrity of the area will not be
compromised; or
ii) Any significant adverse effects on the qualities for which the site has been
designated are clearly outweighed by social, environmental or economic
benefits of national importance. 
c) Local Designations 
Development proposals likely to have a significant adverse effect on Local Nature
Reserves, wildlife sites or other valuable local habitats will be refused unless it can
be demonstrated that;
i) Public benefits clearly outweigh the nature conservation value of the site, and
ii) There is a specific locational requirement for the development, and
iii) Any potential impacts can be satisfactorily mitigated to conserve and enhance
the site's residual conservation interest. 
Page 63

Page 64

d) European Protected Species
European Protected Species are identified in the Habitats Regulations 1994 (as
amended in Scotland). Where a European Protected Species may be present or
affected by development or activity arising from development, a species survey and
where necessary a Species Protection Plan should be prepared to accompany the
planning application, to demonstrate how the Regulations will be complied with. The
survey should be carried out by a suitably experienced and licensed ecological
surveyor. 
Proposals that would have an adverse effect on European Protected Species will not
be approved unless; 
• The need for development is one that is possible for SNH to grant a license for
under the Regulations (e.g. to preserve public health or public safety).
• There is no satisfactory alternative to the development.
• The development will not be detrimental to the maintenance of the favourable
conservation status of the species. 
e) Other protected species
Wild birds and a variety of other animals are protected under domestic legislation,
such as the Wildlife and Countryside Act 1981 (as amended in Scotland by the
Nature Conservation (Scotland) Act 2004 and the Wildlife and Natural Environment
(Scotland) Act 2011), Protection of Badgers Act 1992 and Marine (Scotland) Act
2010. Where a protected species may be present or affected by development or
activity arising from development, a species survey and where necessary a Species
Protection Plan should be prepared to accompany the planning application to
demonstrate how legislation will be complied with. The survey should be carried out
by a suitably experienced ecological surveyor, who may also need to be licensed
depending on the species being surveyed for. 
Proposals which would have an adverse effect on badgers or their setts must be
accompanied by a Badger Protection Plan demonstrating how impacts will be
avoided, mitigated, minimised or compensated for. 
EP2 BIODIVERSITY
All development proposals must, where possible, retain, protect and enhance features of
biological interest and provide for their appropriate management.  Development must
safeguard and where physically possible extend or enhance wildlife corridors and
green/blue networks and prevent fragmentation of existing habitats. 
Development should integrate measures to enhance biodiversity as part of multi-functional
spaces/ routes. 
Proposals for 4 or more housing units or 1000 m2 or more of commercial floorspace must
create new or, where appropriate, enhance natural habitats of ecological and amenity
value. 
Developers must demonstrate, through a Placemaking Statement where required by
Policy PP1 which incorporates a Biodiversity Plan, that they have included biodiversity
features in the design of the development. Habitat creation can be achieved by providing
links into existing green and blue networks, wildlife friendly features such as wildflower
verges and meadows, bird and bat boxes, amphibian friendly kerbing, wildlife crossing
Page 64

Page 65

points such as hedgehog highways and planting to encourage pollination, wildlife friendly
climbing plants, use of hedges rather than fences, incorporating biodiversity measures into
SUDS and retaining some standing or lying dead wood, allotments, orchards and
woodlands. 
Where development would result in loss of natural habitats of ecological amenity value,
compensatory habitat creation will be required where deemed appropriate. 
EP7 FORESTRY, WOODLANDS AND TREES
a) Moray Forestry and Woodland Strategy
Proposals which support the economic, social and environmental objectives and
projects identified in the Moray Forestry and Woodlands Strategy will be supported
where they meet the requirements of other relevant Local Development Plan
policies.  The council will consult Scottish Forestry on proposals which are
considered to adversely affect forests and woodland.  Development proposals must
give consideration to the relationship with existing woodland and trees including
shading, leaf/needle cast, branch cast, wind blow, water table impacts and
commercial forestry operations. 
b) Tree Retention and Survey
Proposals must retain healthy trees and incorporate them within the proposal unless
it is technically unfeasible to retain these.  Where trees exist on or bordering a
development site, a tree survey, tree protection plan and mitigation plan must be
provided with the planning application if the trees or trees bordering the site (or their
roots) have the potential to be affected by development and construction activity. 
Proposals must identify a safeguarding distance to ensure construction works,
including access and drainage arrangements, will not damage or interfere with the
root systems in the short or longer term.  A landscaped buffer may be required where
the council considers that this is required to maintain an appropriate long term
relationship between proposed development and existing trees and woodland. 
Where it is technically unfeasible to retain trees, compensatory planting on a one for
one basis must be provided in accordance with (e) below. 
c) Control of Woodland Removal 
In support of the Scottish Government's Control of Woodland Removal Policy,
Woodland removal within native woodlands identified as a feature of sites protected
under Policy EP1 or woodland identified as Ancient Woodland will not be supported. 
In all other woodlands development which involves permanent woodland removal will
only be permitted where it would achieve significant and clearly defined additional
public benefits (excluding housing) and where removal will not result in unacceptable
adverse effects on the amenity, landscape, biodiversity, economic or recreational
value of the woodland or prejudice the management of the woodland. 
Where it is proposed to remove woodland, compensatory planting at least equal to
the area to be felled must be provided in accordance with e) below. 
d) Tree Preservation Orders and Conservation Areas 
The council will serve Tree Preservation Orders (TPO's) on potentially vulnerable
trees which are of significant amenity value to the community as whole, trees that
contribute to the distinctiveness of a place or trees of significant biodiversity value.
Page 65

Page 66

Within Conservation Areas, the council will only agree to the felling of dead, dying, or
dangerous trees. Trees felled within Conservation Areas or subject to TPO must be
replaced, unless otherwise agreed by the council. 
e) Compensatory Planting 
Where trees or woodland are removed in association with development, developers
must provide compensatory planting to be agreed with the planning authority either
on site, or an alternative site in Moray which is in the applicant's control or through a
commuted payment to the planning authority to deliver compensatory planting and
recreational greenspace. 
GUIDANCE TREES AND DEVELOPMENT
Trees are an important part of Moray's towns and villages and surrounding countryside,
adding colour and interest to the townscape and a sense of nature in our built
environment. They contribute to the diversity of the countryside, in terms of landscape,
wildlife habitat and shelterbelts. Trees also have a key role to play in terms of climate
change by helping to absorb carbon dioxide which is one of the main greenhouse gases
that cause global warming. 
The cumulative loss of woodlands to development can result in significant loss of
woodland cover. In compliance with the Scottish Government Control of Woodland
Removal policy, woodland removal should only be allowed where it would achieve
significant and clearly defined additional public benefits. In appropriate cases a proposal
for compensatory planting may form part of this balance. Where woodland is to be
removed then the Council will require compensatory planting to be provided on site, on
another site in Moray within the applicant's control or through a commuted payment to the
Council towards woodland and greenspace creation and enhancement. Developers
proposing compensatory planting are asked to follow the guidance for site assessment
and woodland design as laid out in Scottish Forestry's "Woodland Creation, Application
Guidance" and its subsequent updates, when preparing their proposal. 
The Council requires a Tree Survey and Tree Protection Plan to be submitted by the
applicant with any planning application for detailed permission on designated or windfall
sites which have trees on them. The survey should include a schedule of trees and/or
groups of trees and a plan showing their location, along with the following details; 
• Reference number for each tree or group of trees.
• Scientific and common names.
• Height and canopy spread in metres (including consideration of full height and
spread).
• Root protection area.
• Crown clearance in metres.
• Trunk diameters in metres (measures at 1.5m above adjacent ground level for single
stem trees or immediately above the root flare for multi stemmed trees).
• Age and life expectancy.
• Condition (physiological and structural).
• Management works required.
• Category rating for all trees within the site (U, A, B or C *). This arboricultural
assessment will be used to identify which trees are suitable for retention within the
proposed development. 
Page 66

Page 67

*BS5837 provides a cascading quality assessment process for categorisation of trees
which tree surveys must follow. An appropriately scaled tree survey plan needs to
accompany the schedule. The plan should be annotated with the details of the tree
survey, showing the location, both within and adjacent to the site, of existing trees, shrubs
and hedgerows. Each numbered tree or groups of trees should show the root protection
area and its category U, A, B, C. 
Based on the guidance in BS5837, only category U trees are discounted from the Tree
Survey and Tree Protection Plan process. Trees in category A and B must be retained,
with category C trees retained as far as practicable and appropriate. Trees proposed for
removal should be replaced with appropriate planting in a landscape plan which should
accompany the application. Trees to be retained will likely be set out in planning
conditions, if not already covered by a Tree Preservation Order. 
If a tree with habitat value is removed, then measures for habitat reinstatement must be
included in the landscape plan. It is noted that in line with part b) of policy EP7 where
woodland is removed compensatory planting must be provided regardless of tree
categorisation." 
A Tree Protection Plan (TPP) must also be submitted with planning applications,
comprising a plan and schedule showing; 
• Proposed design/ layout of final development, including accesses and services.
• Trees to be retained- with those requiring remedial work indicated.
• Trees to be removed.
• Location (and specification) of protective fencing around those trees to be retained
based on the Root Protection Area. 
The TPP should show how the tree survey information has informed the design/ layout
explaining the reasoning for any removal of trees. 
Landscape Scheme
Where appropriate a landscape scheme must be submitted with planning applications,
clearly setting out details of what species of trees, shrubs and grass are proposed, where,
what standard and when planting will take place. Landscape schemes must aim to deliver
multiple benefits in terms of biodiversity, amenity, drainage and recreation as set out in
policy. 
The scheme should also set out the maintenance plan. Applicants/ developers will be
required to replace any trees, shrubs or hedges on the site which die, or are dying,
severely damaged or diseased which will be specified in planning conditions. 
Tree species native to Scotland are recommended for planting in new development -
Alder, Aspen, Birch, Bird Cherry, Blackthorn, Crab Apple, Elm, Gean, Hawthorn, Hazel,
Holly, Juniper, Sessile Oak, Rowan, Scots Pine, Whitebeam, Willow. 
EP8 HISTORIC ENVIRONMENT
a) Scheduled Monuments and Unscheduled Archaeological Sites of Potential
National Importance.
Where a proposed development potentially has a direct impact on a Scheduled
Monument, Scheduled Monument Consent (SMC) is required, in addition to any
other necessary consents.  Historic Environment Scotland manage these consents.
Page 67

Page 68

Development proposals will be refused where they adversely affect the integrity of
the setting of Scheduled Monuments and unscheduled archaeological sites of
potential national importance unless the developer proves that any significant
adverse effects are clearly outweighed by exceptional circumstances, including
social or economic benefits of national importance. 
b) Local Designations
Development proposals which adversely affect sites of local archaeological
importance or the integrity of their settings will be refused unless; 
• Local public benefits clearly outweigh the archaeological value of the site, and
• Consideration has been given to alternative sites for the development and
preservation in situ is not possible.
• Where possible any adverse effects can be satisfactorily mitigated at the
developer's expense. 
The Council will consult Historic Environment Scotland and the Regional
Archaeologist on development proposals which may affect Scheduled Monuments,
nationally important archaeological sites and locally important archaeological sites. 
EP11 BATTLEFIELDS, GARDENS AND DESIGNED LANDSCAPES
Development proposals which adversely affect nationally designated Battlefields or
Gardens and Designed Landscapes or their setting will be refused unless; 
a) The overall character and reasons for the designation will not be compromised, or
b) Any significant adverse effects can be satisfactorily mitigated and are clearly
outweighed by social, environmental, economic or strategic benefits. 
The Council will consult Historic Environment Scotland and the Regional Archaeologist on
any proposals which may affect Inventory Sites. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application. 
Page 68

Page 69

Level 1 -  a flood statement with basic information with regard to flood risk.
Level 2 -  full flood risk assessment providing details of flood risk from all sources,
results of hydrological and hydraulic studies and any appropriate
proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood risk
will be required and any loss of flood storage capacity mitigated to achieve a neutral
or better outcome. Water resistant materials and construction must be used where
Page 69

Page 70

appropriate. Land raising and elevated buildings on structures such as stilts are
unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
Page 70

Page 71

presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side)
(top of bank) 
Less than 1m 6m
1-5m 6-12m
5-15m 12-20m
15m+ 20m+ 
The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP13 FOUL DRAINAGE 
All development within or close to settlements (as defined in the Local Development Plan)
of more than 2,000 population must connect to the public sewerage system unless
connection is not permitted due to lack of capacity. In such circumstances, temporary
provision of private sewerage systems may be allowed provided Scottish Water has
confirmed investment to address this constraint has been allocated within its investment
Programme and the following requirements have been met; 
• Systems must not have an adverse effect on the water environment
• Systems must be designed and built to a standard which will allow adoption by
Scottish Water
• Systems must be designed such that they can be easily connected to a public sewer
in the future. Typically this will mean providing a drainage line up to a likely point of
connection. 
All development within or close to settlements (as above) of less than 2,000 population will
require to connect to public sewerage except where a compelling case is made otherwise.
Factors to be considered in such a case will include size of the proposed development,
whether the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Page 71

Page 72

Where a compelling case is made, a private system may be acceptable provided it does
not pose or add a risk of detrimental effects, including cumulative, to the natural and built
environment, surrounding uses or amenity of the general area. 
Where a private system is deemed to be acceptable, within settlements as above or small
scale development in the countryside, a discharge to land, either full soakaway or raised
mound soakaway, compatible with Technical Handbooks (which sets out guidance on how
proposals may meet the Building  Regulations) must be explored prior to considering a
discharge to surface waters. 
EP14 POLLUTION, CONTAMINATION & HAZARDS
a)  Pollution 
Development proposals which may cause significant air, water, soil, light or noise
pollution or exacerbate existing issues must be accompanied by a detailed
assessment report on the levels, character and transmission of the potential pollution
with measures to mitigate impacts. Where significant or unacceptable impacts
cannot be mitigated, proposals will be refused.   
b) Contamination 
Development proposals on potentially contaminated land will be approved where
they comply with other relevant policies and; 
i) The applicant can demonstrate through site investigations and risk assessment,
that the site is in a condition suitable for the proposed development and is not
causing significant pollution of the environment; and
ii) Where necessary, effective remediation measures are agreed to ensure the
site is made suitable for the new use and to ensure appropriate disposal and/ or
treatment of any hazardous material. 
c) Hazardous sites
Development proposals must avoid and not impact upon hazardous sites or result in
public safety concerns due to proximity or use in the vicinity of hazardous sites. 
EP15 MOD SAFEGUARDING
Development proposals must not adversely impact upon Ministry of Defence safeguarding
operations. Details of consultation zones for Kinloss Barracks and RAF Lossiemouth and
development types which will be subject to consultation with the Defence Infrastructure
Organisation are available from Moray Council. The outer boundaries of the zones are
shown on the Proposals Map.
Page 72

Page 73

WARD 04_17 
22/00385/APP
1st April 2022
Change of house types approved under ref 15/00244/APP
on Plots 4-7 Ordiequish Road Fochabers Moray
for Bob Milton Properties Ltd 
Comments: 
 The application is reported to Committee because it proposes a change in house
type on plots (4-7) on a development previously approved by Committee decision
under application reference 15/00244/APP (for the erection of 49 dwelling houses
on R1 Ordiequish Road, Fochabers).
 The proposal has been advertised for neighbour notification and departure
purposes. 
Procedure: 
 None 
Recommendation 
Grant planning permission: subject to the following conditions and informatives. 
Conditions/Reasons 
1. No development work shall commence on plots 4-7 until a detailed drawing (scale
1:200) has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority confirming the provision of, or
location where a future Electric Vehicle (EV) charging unit is to be connected to an
appropriate electricity supply, including details (written proposals and/ or plans) to
confirm the provision of the necessary cabling, ducting, and consumer units
capable of supporting the future charging unit; and thereafter the EV charging
infrastructure shall be provided in accordance with the approved drawing and
details prior to the first occupation of the dwelling house. 
Reason: In the interests of an acceptable form of development and the provision
of infrastructure to support the use of low carbon transport, through the provision
of details currently lacking. 
2. Parking spaces shall be provided as shown on Drawing HT50/01/07d prior to the
occupation or completion of each of the dwelling houses, whichever is the sooner.
The parking spaces shall thereafter be retained throughout the lifetime of the
development, unless otherwise agreed in writing with the Council as Planning
Authority. 
Item 5
Page 73

Page 74

Reason: To ensure the permanent availability of the level of parking necessary for
residents/visitors/others in the interests of an acceptable development and road
safety. 
3. No boundary fences, hedges, walls or any other obstruction whatsoever over
0.6m in height and fronting onto the public road shall be within 2.4m of the edge of
the carriageway. 
Reason: To enable drivers of vehicles entering or exiting the site to have a clear
view so that they can undertake the manoeuvre safely and with the minimum
interference to the safety and free flow of traffic on the public road. 
4.   New boundary walls/fences shall be set back from the edge of the public
carriageway at a distance of 2.0m. 
Reason: To ensure acceptable development in the interests of road safety. 
5.   Notwithstanding the submitted details no development works on plots 4-7 shall
commence until details (plans and elevations including material specification)
have been submitted to and approved in writing by the Council, as Planning
Authority showing the precise location and design of the 600mm boundary wall to
be provided on the south and east boundaries of plot 7 which should be match the
wall details of plot 8 (application reference 21/01487/APP).   Thereafter the
development must be carried out in accordance with the agreed details. 
Reason: In order to provide details currently lacking and in order to ensure an
acceptable form of development. 
6.   Notwithstanding the submitted details no development works on plots 4-7 shall
commence until a detailed landscape plan including species specifications,
location, heights and timescale for all planting has been submitted to and
approved in writing by the Council as Planning Authority.  On-plot species shall be
a minimum of 1.5m in height at the time of planting.  Thereafter the development
must be carried out in accordance with the agreed details. 
Reason: In order to provide details currently lacking and in order to ensure an
acceptable form of development. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The extant consent for this development is currently being implemented on the ground
and defines the existing design, layout and character of the development which
includes frontage car parking.   
The variation of the house types proposed is acceptable and whilst it is noted that the
parking fails to meet the current MLDP 2020 policy requirement of a maximum of 50%
frontage car parking, the parking arrangement proposed for plots 4-7 is consistent with
the existing consented development and will reflect and maintain the established layout
Page 74

Page 75

and character of the consented development.  It is also noted that the proposed
boundary hedging and ornamental tree to be planted in each plot will help to soften the
overall visual impact of parked cars fronting on to the street. Furthermore, noting that
the accepted land use nor the overall character and layout of the consented house
scheme will change as a result of the proposal; this application is recommended as an
acceptable departure from Policy PP1 (iv), DP1 (ii) b) and EP3 Part b.  In all other
regards, subject to conditions, the proposal complies with the requirements of the
MLDP 2020 and there are no material considerations that indicate otherwise. 
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
This planning consent relates solely to plot 4-7 as defined by this application
description and the application site edge red as detailed on site plan
SLP001/02/01G and block plan HT50/01/07D. 
A Building Warrant will be required for the proposals. Should you require further
assistance please contact the Building Standards Duty Officer between 2pm and
4pm or telephone on 03001234561.  No appointment is necessary.  Alternatively
e-mail buildingstandards@moray.gov.uk 
THE TRANSPORTATION MANAGER, has commented that:- 
The provision of Electric Vehicle (EV) chargers and/or associated infrastructure
shall be provided in accordance with Moray Council guidelines. Cabling between
charging units and parking spaces must not cross or obstruct the public road
including footways. Infrastructure provided to enable EV charging must be
retained for this purpose for the lifetime of the development unless otherwise
agreed in writing by the Planning Authority. Guidance on Electric Vehicle (EV)
Charging requirements can be found at:
http://www.moray.gov.uk/downloads/file134860.pdf 
Planning consent does not carry with it the right to carry out works within the
public road boundary. 
Before starting any work on the existing public road the applicant is obliged to
apply for a road opening permit in accordance with Section 56 of the Roads
(Scotland) Act 1984. This includes any temporary access joining with the public
road. Advice on these matters can be obtained by emailing
roadspermits@moray.gov.uk 
Public utility apparatus may be affected by this proposal. Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
Page 75

Page 76

No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
HT009/05/02 B Plot 4 - elevations  
Location plan
HT32/02/01 A Plot 7 - Newton house type
HT009/05/01 B Plot 4 - floor plans
900/01 A Road/sewer layout
HT018/01/02 C Plot 5 - elevations
HT018/01/01 A Plot 5 - floor plans
HT/25/02/02 B Plot 6 - elevations
900  Road layout
HT/25/02/01 B Plot 6 - floor plans
SLP001/02/01RC  Roughcast colours
920 A Sewer layout
SITE SECTIONS 01  Site sections
SLP002/02/01LDS A Landscape layout 
HT50/01/07 D Block plan
SLP001/02/01 G Site plan 
Page 76

Page 77

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Plots 4-7
Ordiequish Road
Planning Application Ref Number: 
22/00385/APP
Location Plan
Applicant Name: 
Bob Milton Properties Ltd
Page 77

Page 78

Site
plan
16/01664/APP
Page 78

Page 79

Block plan
Page 79

Page 80

Site sections
Page 80

Page 81

Photo Location plan
16/
Page 81

Page 82

View from South East
Page 82

Page 83

View from North East
Page 83

Page 84

Page 84

Page 85

PLANNING APPLICATION: 22/00385/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.  THE PROPOSAL 
   This application seeks planning permission to change the house types
approved on plots 4-7 under application 15/00244/APP (for the erection of
49 dwelling houses on R1 Ordiequish Road, Fochabers).
   The proposed house types are as follows: 
   Plot 4: Single storey, 3 bedroom “Chilton” house type.  The dwelling
will be finished in artic white roughcast with feature Fyfestone on the
front of the dwelling. A 3 Bedroom “Scotton” was approved on this
plot as part of application 15/00244/APP.  
   Plot 5: Two storey, 4 bedroom (with study) “Dulriston”. The dwelling
will be finished in artic white roughcast with feature Fyfestone on the
front of the dwelling.  A 4 bedroom “Criagton” was approved on this
plot as part of application 15/00244/APP.  
   Plot 6: Two storey, 4 bedroom (with study) “Brampton”. The dwelling
will be finished in artic white roughcast with feature Fyfestone on the
front of the dwelling.  A 3 bedroom “Chilton” was approved on this
plot as part of 15/00244/APP.  
   Plot 7: Single storey, 3 bedroom “Newton” this design has not
previously been approved on this development.  The dwelling will be
finished in artic white roughcast with feature Fyfestone on the front of
the dwelling.  A 5 bedroom “Sutton” was approved on this plot as
part of 15/00244/APP.  
   The plot layout arrangement includes garden area, driveway, parking
provision with the proposed location for the EV charging point identified,
and, boundary details including; 1800mm screen fencing, frontage
hedging and the 600mm feature boundary wall at Plot 7 to provide a
defined entrance to the development.
   The dwellings will connect to the public water supply and mains drainage
with on plot soakaway rings, updated drainage calculations have been
provided to take account of the revised design. 
   Plots 4-7 are part of a commenced residential development under
application 15/00244/APP with construction on “Phase 1” well underway.  
Page 85

Page 86

2.   THE SITE 
    Located on the southern edge of Fochabers, the site is located on the R1
Ordiequish Road Local Development Plan Designation which covers an
area of 2.6ha and has an indicative capacity for 50 units and the subject
of a commenced consent under application 15/00244/APP.  
   Plots 4-7 are located along the eastern boundary of the site and are
located in “Phase 1” of the consented development.  
   Plots 4-7 have their frontages onto Ordiequish Road with established
woodland beyond.  Plots 4-7 occupy a central position on the eastern
boundary of the site and the rest of the consented scheme extends to the
north, west and south from the plots. Plot 7 is a corner plot with its
southern boundary fronting onto the southern development road with plot
8 located beyond.  
   The settlement of Fochabers falls within the Spey Valley Special
Landscape Area.   
3.   HISTORY 
12/01577/PPP - Planning permission in principle for 50 houses and associated
works on Site R1 Fochabers. This was approved 10 February 2014, subject to
conditions and the terms of a s75 Agreement covering developer contributions
and affordable housing provision. 
15/00244/APP - Detailed planning permission for the erection of 49 houses on
land west of Ordiquish Road, Fochabers. Decision issued by Committee
Decision on 26 November 2015 subject to conditions and informatives. This
application also necessitated a “Minute of Variation” to the previously agreed
s75 Agreement. 
21/00933/APP - Change of house type approved under ref 15/00244/APP to
Chilton House type on Plot 3 Ordiequish Road Fochabers. Decision issued on
18 August 2021. 
21/01487/APP - Amend the house design approved on Plot 8 Ordiequish Fields
under the application 15/00244/APP.  Decision Issued on 09 December 2021.   
4.   POLICY - SEE APPENDIX 
5.   ADVERTISEMENTS 
5.1  Advertised for neighbour notification purposes and as a departure to the local
development plan. 
6.   CONSULTATIONS 
Contaminated Land – No objection 
Environmental Health – No objection 
Page 86

Page 87

Moray Flood Risk Management – No objection 
Scottish Water – No objection with advisory information advising that Scottish
Water records show that there is proposed infrastructure within the site but that
it is understood to be pipework proposed by the developer to service the
Development. Thereafter information about the Scottish Water Pre-
Development Enquiry Process is provided for the developer. 
Transportation Manager – No objection subject to conditions and
informatives.   
Developer Obligations – No objection, response confirms that since this
planning application only changes the house types on plot 4-7 and this change
results in less than 1 Standard Residential Unit Equivalent (SRUE), no further
Developer Obligations or Affordable Housing contributions are required. 
Strategic Planning and Delivery - While we do not object to the principle of
the remix the application, the proposal does not meet the parking criteria of
Policy PP1 (iv). 
PP1 (iv) is clear that car parking must not dominate the streetscape to the front
or rear of properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum of
50% car parking within the front curtilage or on the street, subject to the visual
impact of parking being mitigated. 
While it is acknowledged that there is an extant consent for the whole site with
two recently approved individual remix applications along the frontage, the
proposed layout fails to comply with the parking aspect of PP1 as all of the
proposed parking will be located in front of the building line.  Furthermore
Transportation Services have stated in their response the proposed garage
dimensions fail to meet the required dimensions (7m x 3m) to count as a
parking space.  The internal garages therefore cannot be counted as a space in
terms of being behind located the building line. 
While it is acknowledged that the applicant has tried to mitigate the appearance
of parked cars this is not enough to mitigate the overall visual impact of parking
along this frontage as none of the house types within this application (and
house types along the frontage outwith this application) allow for parking to be
located to the side or rear which is contrary to the aims of the policy.  In
particular, the inclusion of a 4 bed house (Plot 6) will require 3 spaces along the
majority of the frontage of the house.   
For the reasons set out above the proposal is deemed to be a departure from
PP1 Placemaking (iv). 
7.   OBJECTIONS-REPRESENTATIONS 
None. 
Page 87

Page 88

8.   OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the development plan i.e. the Adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. The main planning issues are considered below: 
8.2  Background 
As confirmed by the applicant, the application to change the house types has
been submitted to meet current market demand in the area while reflecting the
character and appearance of the consented development. 
8.3  Principle of Development 
The principle of residential development on the site for residential use is
accepted taking account the extant consent on the site (15/00244/APP), the
commenced development works and the local plan designation of the site as a
designated residential site (R1 Ordiequish Road). 
8.3.1 Since the site currently benefits from an extant/implemented consent the
assessment of this application focuses on the revised house designs, plot
layout, amenity, drainage, access/parking considerations and any implications
for developer obligations or the agreed S75. 
8.4   Siting and Character (R1 Fochabers, PP1, DP1 and DP2)
Within the consented development plots 1-8 form the frontage of the
development on to Ordiequish Road.  Plots 4-7 are the subject of this remix
application.  As is the established character in this consented development, the
houses are to be positioned centrally on the plots with the orientation of the
house fronting onto Ordiequish Road with parking provided in front drives,
noting that while the dwellings do have integral garages within their design they
fall short of the minimum size requirement to be considered as a parking space.   
8.4.1 The design and layout of the development at Ordiequish Road was consented
under the 2008 Moray Local Development Plan prior to the requirement for a
minimum of 50% of car parking to be located to the side or rear and behind the
building line with a maximum of 50% car parking within the front curtilage or on
the street which was introduced as part of the MLDP 2020.  This means that
while the parking for each of the plots fails to comply with the current MLDP
2020 parking requirement, the parking arrangement proposed for plots 4-7 is
consistent with the existing consented development and will reflect and
maintain the established character and layout of the development which is
currently being built out on the ground.   It is also noted that the proposed
boundary hedging and ornamental tree to be planted in each plot will help to
soften the overall visual impact of parked cars fronting on to the street.  Given
these factors, whilst it is recognised that the proposed parking at plots 4-7 will
not comply with the parking policy requirement of the MLDP 2020 as defined by
Policy PP1 (iv) (and DP1 (ii) b))), it will be consistent with the existing
consented development and established character of the development and on
this basis can therefore be recommended for approval as an acceptable
departure from Policy PP1 (iv). 
Page 88

Page 89

8.5 Design and amenity (PP1, PP3 DP1 and DP2)
The consented development comprises a variety of two, three, four and five
bedroom modern detached and semi-detached house types, of single and two
storey design.  The house designs proposed represent existing house types
agreed for this development, or in the case of the proposed “Newton” house for
plot 7 is of a character and style that reflects the design/character of the
development (noting that the material finishes proposed are consistent with the
materials already agreed for this development).  The proposed house designs
are acceptable and will not materially alter the overall character of the
development. The houses remain centrally positioned within the plot and the
separation distances is consistent with those already agreed in the
development.  No adverse impacts upon amenity i.e. loss of privacy, loss of
light or overbearing impact is considered to occur as a result of the change in
house types. 
8.6 Spey Valley Special Landscape Area (EP3, i) b)
This application is for a remix of house types on four individual plots on a
consented house scheme.  The accepted land use nor the overall character of
the consented house scheme will change as a result of the application. 
Therefore notwithstanding the departure issue against Policy PP1 (iv) and DP1
(ii) b), the proposal is not considered to compromise the integrity or qualities of
the Special Landscape Area and can therefore be recommended as an
acceptable departure from policy EP3 i) b). 
8.7 Water and Drainage (DP1, EP12 and EP13)
The dwellings will connect to the public water supply and mains drainage with
on plot soakaway rings; updated drainage calculations have been provided to
take account of the revised design. 
8.7.1 Following consultation Moray Flood Risk Management has raised no objection
to the proposal. Scottish Water has also raised no objection to the proposal,
and it is noted that any connection required will be subject to liaison between
the applicant and Scottish Water. The proposal complies with the requisite
requirements of Policies DP1, EP12 and EP13. 
8.8 Access and Parking DP1 and PP3
Following the submission of amended plans, the Transportation Service has
raised no objection to the proposal and has provided relevant and necessary
Transportation conditions including electric vehicle charging enabling
infrastructure, parking and plot access requirements.   
8.8.1 As has been identified previously the proposal fails to comply with current
policy requirements of a minimum of 50% of car parking provided to the side or
rear and behind the building line with a maximum of 50% car parking within the
front curtilage or on the street.  However, the plots have demonstrated that the
requisite parking standards can be achieved on each plot, noting that frontage
parking is consistent with the existing consented development and has already
been accepted as an acceptable departure against DP1 (ii) b) (and Policy PP1
(iv)).   
Page 89

Page 90

8.9 Developer Obligations (PP3)
Developer Obligations for the consented development (15/00244/APP) required
financial contributions towards recreation provision in the Milnes High School
Catchment Area and a contribution to the Core Path Network Improvement in
Fochabers. These matters are covered by a s75 Legal Agreement. Following
assessment, the Developer Obligations Section, has confirmed that since this
planning application only changes the house types on plot 4-7 and this change
results in less than 1 Standard Residential Unit Equivalent (SRUE), no further
Developer Obligations are required, and, that the existing s75 Agreement will
not require to be modified, and the existing legal agreement will apply. 
8.10 Affordable Housing (DP2)
As part of the consented development 15/00244/APP, affordable housing is
also to be provided through on-site provision in the form of 12 affordable units
which are located within the north-western/western part of the site (conditions
11 and 12 refer). The final details for the affordable housing must be provided
prior to commencement of “Phase 3” of the development and delivery of the
affordable units on site must be achieved before the completion of the 34th
open market house. This proposal is for a change of house type on plots 4-7
which are part of Phase 1 of the development, and therefore it does not affect
these requirements which apply to latter phases of the development. 
8.10.1 Taking account of these matters the proposal is acceptable under affordable
housing requirements. 
Conclusion 
The principle of residential development is established by the extant consent
which is currently being implemented on the ground.   The variation of the
house types proposed is acceptable and whilst it is noted that the parking fails
to meet the current parking requirement of Policy PP1 (iv) and DP1 (ii) b), the
parking arrangement proposed for plots 4-7 is consistent with the existing
consented development and will reflect and maintain the established character
and layout of the development.  It is also noted that the proposed boundary
hedging and ornamental tree to be planted in each plot will help to soften the
overall visual impact of parked cars fronting on to the street.   
Therefore, whilst it is recognised that the proposed parking at plots 4-7 will not
comply with the parking policy requirement of the MLDP 2020 as defined by
Policy PP1 (iv) and DP1 (ii) b), it will be consistent with the existing consented
development and established character of the development.  Having failed to
be fully compliant with Policies PP1 and DP1, the proposal therefore also fails
to be fully compliant with Policy EP3 i) b.   
However, the proposed frontage parking is consistent with the existing
consented scheme which is currently being built out on the ground and will
reflect and maintain the existing character and layout of the development. 
Furthermore, noting that the accepted land use nor the overall character and
layout of the consented house scheme will change as a result of the proposal;
this application is recommended as an acceptable departure from Policy PP1
(iv), DP1 (ii) b) and EP3 i) b.   
Page 90

Page 91

REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The extant consent for this development is currently being implemented on the
ground and defines the existing design, layout and character of the
development which includes frontage car parking.   
The variation of the house types proposed is acceptable and whilst it is noted
that the parking fails to meet the current MLDP 2020 policy requirement of a
maximum of 50% frontage car parking.  The parking arrangement proposed for
plots 4-7 is consistent with the existing consented development and will reflect
and maintain the established layout and character of the consented
development.  It is also noted that the proposed boundary hedging and
ornamental trees to be planted in each plot will help to soften the overall visual
impact of parked cars fronting on to the street. Furthermore, noting that the
accepted land use nor the overall character and layout of the consented house
scheme will change as a result of the proposal; this application is
recommended as an acceptable departure from Policy PP1 (iv), DP1 (ii) b) and
EP3 i) b.  In all other regards, subject to conditions, the proposal complies with
the requirements of the MLDP 2020 and there are no material considerations
that indicate otherwise. 
Author/Contact
Officer:
Shona Strachan           
Planning Officer
Ext: 01343 563303 
Beverly Smith
Development Management & Building Standards Manager
Page 91

Page 92

Page 92

Page 93

APPENDIX 
POLICY 
Proposed Moray Local Development Plan 2020 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space. 
ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS.
Page 93

Page 94

ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use. 
b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours 
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations 
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Page 94

Page 95

Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment. 
Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
PP1 PLACEMAKING 
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(i) Character and Identity
• Create places that are distinctive to prevent homogenous 'anywhere'
development;
• Provide a number of character areas reflecting site characteristics that
have their own distinctive identity and are clearly distinguishable;
Page 95

Page 96

• Provide distinctiveness between and in each character area through a
combination of measures including variation in urban form, street
structure/network, architecture and masonry, accent features (such as
porches), surrounds and detailing, materials (buildings and surfaces),
colour, boundary treatments, hard/soft landscaping and a variety of
approaches to tree species and planting that emphasises the hierarchy of
open spaces and streets within a cohesive design strategy for the whole
development;
• Distinctiveness must be reinforced along main thoroughfares, open
spaces and places where people may congregate such as
shopping/service centres;
• Retain, incorporate and/or respond to relevant elements of the landscape
such as topography and planted features, natural and historic
environment, and propose street naming (in residential developments of
20 units and above, where proposed names are to be submitted with the
planning application) to retain and enhance local associations; 
(ii) Healthier, Safer Environments
• Designed to prevent crime, fear of crime and anti-social behaviour with
good levels of natural surveillance and security using treatments such as
low boundary walls, dual frontages (principal rooms) and well-lit routes to
encourage social interaction.  Unbroken high boundary treatments such
as wooden fencing and blank gables onto routes, open spaces and
communal areas will not be acceptable.
• Designed to encourage physical exercise for people of all abilities.
• Create a distinctive urban form with landmarks, key buildings, vistas,
gateways and public art to provide good orientation and navigation
through the development.
• Provide a mix of compatible uses, where indicated within settlement
statements, integrated into the fabric of buildings within the street.
• Prioritise pedestrians and cyclists by providing a permeable movement
framework that incorporates desire lines (including connecting to and
upgrading existing desire lines) and is fully integrated with the surrounding
network to create walkable neighbourhoods and encourage physical
activity.
• Integrate multi- functional active travel routes, green and open space into
layout and design, to create well connected places that encourage
physical activity, provide attractive spaces for people to interact and to
connect with nature.
• Create safe streets that influence driver behaviour to reduce vehicle
speeds that are appropriate to the local context such as through shorter
streets, reduced visibility and varying the building line.
• Provide seating opportunities within streets, paths and open spaces for all
generations and mobility's to interact, participate in activity, and rest and
reflect.
• Provide for people with mobility problems or a disability to access
buildings, places and open spaces.
• Create development with public fronts and private backs. 
• Maximise environmental benefits through the orientation of buildings,
streets and open space to maximise the health benefits associated with
solar gain and wind shelter.
Page 96

Page 97

(iii) Housing Mix
• Provide a wide range of well integrated tenures, including a range of
house types and plot sizes for different household sizes, incomes and
generations and meet the affordable and accessible requirements of
policy DP2 Housing.
• All tenures of housing should have equal access to amenities, greenspace
and active travel routes. 
(iv) Open Spaces/Landscaping
• Provide accessible, multi-functional open space within a clearly defined
hierarchy integrated into the development and connected via an active
travel network of  green/blue corridors that are fully incorporated into the
development and to the surrounding area, and meet the requirements of
policy EP5 Open Space and the Open Space Strategy Supplementary
Guidance and Policy EP12 Managing the Water Environment and
Drainage Impact Assessment for New Developments Supplementary
Guidance.
• Landscaped areas must provide seasonal variation, (mix of planting and
colour) including native planting for pollination and food production.
• Landscaping areas that because of their size, shape or location would not
form any useable space or that will not positively contribute to the
character of an area will not contribute to the open space requirements of
Policy EP4 Open Space.
• Semi-mature tree planting and shrubs must be provided along all routes
with the variety of approaches reflecting and accentuating the street
hierarchy.
• Public and private space must be clearly defined.
• Play areas (where identified) must be inclusive, providing equipment so
the facility is for every child/young person regardless of ability and
provided upon completion of 50% of the character area.
• Proposals must provide advance landscaping identified in site
designations and meet the quality requirements of policy EP5 Open
Space.
• Structural landscaping must incorporate countryside style paths (such as
bound or compacted gravel) with waymarkers.
•  Maintenance arrangements for all paths, trees, hedging, shrubs, play/
sports areas, roundabouts and other open/ green spaces and blue/green
corridors must be provided. 
v) Biodiversity
• Create a variety of high quality multi- functional green/blue spaces and
networks that connect people and nature, that include trees, hedges and
planting to enhance biodiversity and support habitats/wildlife and comply
with policy EP2 Biodiversity and Geodiversity and EP5 Open Space.
• A plan detailing how different elements of the development will contribute
to supporting biodiversity must be included in the design statement
submitted with the planning application.
• Integrate green and blue infrastructure such as swales, permeable paving,
SUDS ponds, green roofs and walls and grass/wildflower verges into
streets, parking areas and plots to sustainably address drainage and
Page 97

Page 98

flooding issues and enhance biodiversity from the outset of the
development.
• Developments must safeguard and where physically possible extend or
enhance wildlife corridors and green/blue networks and prevent
fragmentation of existing habitats. 
(vi) Parking
• Car parking must not dominate the streetscape to the front or rear of
properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum
of 50% car parking within the front curtilage or on street, subject to the
visual impact being mitigated by hedging, low stone boundary walls or
other acceptable treatments that enhance the streetscape.
• Provide semi-mature trees and planting within communal private and
public/visitor parking areas and on-street parking at a maximum interval of
4 car parking spaces.
• Secure and covered cycle parking and storage, car sharing spaces and
electric car charging points must be provided in accordance with policy
DP1 Development Principles.
• Parking areas must use a variation in materials to reduce the visual
impact on the streetscene. 
(vii) Street Layout and Detail
• Provide a clear hierarchy of streets reinforced through street width,
building density and street and building design, materials, hard/soft
landscaping and a variety of approaches to tree planting and shrubs.
• Streets and connecting routes should encourage walking and cycling over
use of the private car by providing well connected, safe and appealing
routes.
• Design junctions to prioritise pedestrians, accommodate active travel and
public transport and service/emergency vehicles to reflect the context and
urban form and ensure that the street pattern is not standardised.  
• Dead-end streets/cul-de-sacs will only be selectively permitted such as on
rural edges or where topography, site size, shape or relationship to
adjacent developments prevent an alternative more permeable layout.
These must be short, serving no more than 10 units and provide walking
and cycling through routes to maximise connectivity to the surrounding
area.
• Where a roundabout forms a gateway into, or a landmark within, a town
and/or a development, it must be designed to create a gateway feature or
to contribute positively to the character of the area.
• Design principles for street layouts must be informed by a Street
Engineering Review (SER) and align with Roads Construction Consent
(RCC) to provide certainty that the development will be delivered as per
the planning consent.
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan.¬¬¬ 
Page 98

Page 99

(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
Page 99

Page 100

400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. 
Alterations and extensions must be compatible with the character of the
existing building in terms of design, form, choice of materials and positioning
and meet all other relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2.
Page 100

Page 101

f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry.
Page 101

Page 102

h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
DP2 HOUSING
a) Proposals for development on all designated and windfall housing sites must include
a design statement and shall include supporting information regarding the
comprehensive layout and development of the whole site, addressing infrastructure,
access for pedestrians, cyclists, public transport and service vehicles, landscaping,
drainage, affordable and accessible housing and other matters as may be required
by the planning authority, unless these requirements are not specified in the site
designation or are considered not to be required. 
Proposals must comply with Policy PP1, DP1, the site development requirements
within the settlement plans, all other relevant policies within the Plan and must
comply with the following requirements; 
b) Piecemeal/ individual plot development proposals 
Piecemeal and individual/ plot development proposals will only be acceptable where
details for the comprehensive redevelopment of the site are provided to the
satisfaction of the planning authority and proposals comply with the terms of Policy
DP1, other relevant policies including access, affordable and accessible housing,
landscaping and open space and where appropriate key design principles and site
designation requirements are met. 
Proposals for piecemeal/ plot development must be accompanied by a Delivery Plan
setting out how the comprehensive development of the site will be achieved.              
c) Housing density 
Capacity figures indicated within site designations are indicative only. Proposed
capacities will be considered through the Quality Auditing process against the
characteristics of the site, character of the surrounding area, conformity with all
policies and the requirements of good Placemaking as set out in Policies PP1 and
DP1. 
d) Affordable Housing 
Proposals for all housing developments (including conversions) must provide a
contribution towards the provision of affordable housing. 
Proposals for new housing developments of 4 or more units (including conversions)
must provide 25% of the total units as affordable housing in  affordable tenures to be
agreed by the Housing Strategy and Development Manager. For proposals of less
than 4 market housing units a commuted payment will be required towards meeting
housing needs in the local housing market area. 
A higher percentage contribution will be considered subject to funding availability, as
informed by the Local Housing Strategy. A lesser contribution or alternative in the
form of off-site provision or a commuted payment will only be considered where
exceptional site development costs or other project viability issues are demonstrated
and agreed by the Housing Strategy and Development Manager and the Strategic
Planning and Development Manager. Intermediate tenures will be considered in
accordance with the HNDA and Local Housing Strategy, and agreed with the
Housing Strategy and Development Manager.
Page 102

Page 103

Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 40. 
e) Housing Mix and Tenure Integration   
Proposals must demonstrate tenure integration and meet the following criteria; 
• Architectural style and external finishes must ensure that homes are tenure
blind 
• The spatial mix must ensure communities are integrated to share school
catchment areas, open spaces, play areas, sports areas, bus stops and other
community facilities. 
f) Accessible Housing 
Housing proposals of 10 or more units incorporating affordable housing will be
required to provide 10% of the private sector units to wheelchair accessible standard.
Flexibility may be applied on sites where topography would be particularly
challenging for wheelchair users. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 41. 
POLICY GUIDANCE NOTE- AFFORDABLE AND ACCESSIBLE HOUSING
Affordable Housing
Providing affordable housing is a key priority for Moray Council and this is reflected in the
Local Outcomes Improvement Plan (LOIP) and the Local Housing Strategy (LHS). The
Council's Housing Need and Demand Assessment 2017 highlights the significant
requirement for affordable housing in Moray, which is a national issue, resulting from  a
number of factors including affordability issues, downturn in the economy and the
shortage of public and private sector rented houses. 
Planning policies assist with the provision of affordable housing, which is defined in
Scottish Planning Policy (SPP) as; 
"housing of a reasonable quality that is affordable to people on modest incomes.
Affordable housing may be provided in the form of social rented accommodation, mid-
market rented accommodation, shared ownership housing, shared equity housing,
housing sold at a discount (including plots for self -build and low cost housing without
subsidy." This local development plan regards lower quartile earnings as "modest
incomes". 
The 2017 HNDA identified a requirement for 56% of all need and demand to be affordable
units in Moray between 2017 and 2035. This Local Development Plan has lowered the
threshold so that individual house proposals are required to make a contribution towards
affordable housing provision, which is intended to ensure proposals do not circumnavigate
the policy and provide a fair and transparent process. 
A number of variables influence affordability of housing, including mortgage deposit
requirements, mortgage interest rates, lower quartile house prices, lower quartile private
rents, lower quartile full time gross earnings. Changes in these variables will affect the
Page 103

Page 104

affordability of housing in Moray. The maximum affordable rent and maximum affordable
house purchase prices is published on the Council's website at
http://www.moray.gov.uk/moray_standard/page_90100.html. The current Local Housing
Allowance will be used as a proxy for average private sector rents.
Affordable housing should be provided on site and as part of a mixed development of
private and affordable units. To meet the need for affordable housing there may be
proposals for 100% provision of affordable housing and these will be acceptable as part of
a wider mixed community, provided all other  Local Development Plan policies are met. 
The policy requires single house proposals to make a commuted sum payment as a
developer obligation towards affordable housing, with the cost figure published annually
on the Council website at http://www.moray.gov.uk/moray_standard/page_94665.html and
determined by the District Valuer's assessment of the value of serviced land for affordable
housing in Moray. This allows developers to be clear at the outset of a project about the
potential cost of commuted payments and should be reflected in land values. 
The type of affordable housing to be provided will be determined by the Housing and
Property service. Developers should contact Housing and Property as early as possible.
Housing and Property will decide whether a commuted payment or affordable units will be
required on a site by site basis.   Housing and Property will provide developers with an
affordable housing mix, detailing the size and type of housing required based on
HNDA/LHS requirements. 
The Council will consider the following categories of affordable housing within the context
of the needs identified in the HNDA/ LHS;
• Social rented accommodation- housing provided by an affordable rent managed by a
Registered Social Landlord such as a housing association or another body regulated
by the Scottish Housing Regulator, including Moray Council.
• Mid-market rent accommodation- housing with rents set at a level higher than purely
social rent, but lower than market rent levels and affordable by households in
housing need. Mid-market rent housing can be provided by the private and social
housing sectors.
• Shared equity housing- sales to low income households, administered through a
Scottish Government scheme e.g. Low-cost initiative for First Time Buyers (LIFT). 
Any proposals to provide affordable housing in a form other than those listed above, must
demonstrate that the cost to the householder is "affordable" in the Moray context and that
the property will remain "affordable" in perpetuity. 
Affordable housing requirement figures will be rounded up. 
The Strategic Housing Investment Plan (SHIP) is produced annually by the Council and
identifies details of the proposed delivery of affordable housing. 
Accessible housing
Scottish Planning Policy states (para 28) that "the aim is to achieve the right development
in the right place; it is not to allow development at any cost" and "that policies and
decisions should be……supporting delivery of accessible housing."
Policy DP2 aims to; 
• Assist the Council, the NHS and the Health and Social Care Moray to meet the
challenges presented by our ageing population and the shared aim of helping people
Page 104

Page 105

to live well at home or in a homely setting. The HNDA 2017 demonstrates that
Moray's population is ageing and there is a trend towards older and smaller
households. 
• Provide increased choice of tenure to people with physical disabilities or mobility
impairments, by increasing the supply of accessible housing in the private sector.
There is currently a mismatch between the size and type of housing required and the
size and type of housing available across all tenures. This mismatch, along with
increasing housing needs associated with physical disability, are the likely drivers of
owner occupiers seeking public sector accessible housing to meet medical needs. 
Accessible/ adapted housing can promote independence and wellbeing for older or
disabled people, can facilitate self- care, informal care and unpaid care, potentially prevent
falls and hospital admissions and can delay entry into residential care. 
Policy DP2 requires that housing proposals of 10 or more units incorporating affordable
housingmust provide 10% of the private sector units to wheelchair accessible standard
where all the rooms are accessible to a wheelchair user. 
This applies to new build and conversion/ redevelopment projects. Flexibility may apply
where there is extremely challenging topography or where the site is in a remote location.
For the purposes of Policy DP2, "remote" locations are defined as being rural areas
outside settlement and Rural Grouping boundaries as defined in the Local Development
Plan. 
Accessible units should be in a location which provides convenient access, in terms of
distance, gradient and available public transport, to reach the facilities needed for
independent living. Small, low maintenance gardens are generally regarded as a positive
feature by this customer group. 
New wheelchair accessible housing in any tenure must comply with Housing for Varying
Needs Standards (HfVNs), including the standards specific to dwellings for wheelchair
users. HfVNs is available at
http://webarchive.nationalarchives.gov.uk/20131205115152uo_/http://www.archive2.officia
l-documents.co.uk/document/deps/cs/HousingOutput/start.htm 
The specific design specification required to meet the terms of this policy are; 
External requirements
• location(s) convenient for amenities and facilities e.g. public transport, local shops
etc
• car parking space as close as possible to the entrance door and at a maximum
distance of 15m (HfVNs para 7.13.4 refers).
• Step free paths within curtilage, ramp gradients preferably of 1:20 but no steeper
than 1:12 (HfVNs para 7.7.1 refers) 
Internal requirements
• Hallways- minimum 1200mm wide (HfVNs para 10.2.3 refers)
• Door frames- minimum 926mm wide door leaf, giving a clear width of 870mm (HfVNs
para 10.5.7 refers)
Page 105

Page 106

• Bathrooms/ wet rooms- 1500mm wheelchair turning circle required (HfVNs para
14.9.2 refers) 
Accessible housing requirement figures will be rounded down. 
All proposals for new build or converted housing should set out details of how they will
comply with this policy in their planning application. 
EP3 SPECIAL LANDSCAPE AREAS AND LANDSCAPE CHARACTER
i)  Special Landscape Areas (SLA's) 
Development proposals within SLA's will only be permitted where they do not
prejudice the special qualities of the designated area set out in the Moray Local
Landscape Designation Review, adopt the highest standards of design in
accordance with Policy DP1 and other relevant policies, minimises adverse impacts
on the landscape and visual qualities the area is important for, and are for one of the
following uses; 
a) In rural areas (outwith defined settlement and rural grouping boundaries);
i) Where the proposal involves an appropriate extension or change of use to
existing buildings, or
ii) For uses directly related to distilling, agriculture, forestry and fishing which
have a clear locational need and demonstrate that there is no alternative
location, or
iii) For nationally significant infrastructure developments identified in the
National Planning Framework, 
b) In urban areas (within defined settlement, rural grouping boundaries and LONG
designations);
i) Where proposals conform with the requirements of the settlement
statements, Policies PP1, DP1 and DP3 as appropriate and all other
policy requirements, and
ii) Proposals reflect the traditional settlement character in terms of siting and
design. 
c) The Coastal (Culbin to Burghead, Burghead to Lossiemouth, Lossiemouth to
Portgordon, Portgordon to Cullen Coast), Cluny Hill, Spynie, Quarrywood and
Pluscarden SLA's are classed as " sensitive" in terms of Policy DP4 and no
new housing in the open countryside will be permitted within these SLA's. 
Proposals for new housing within other SLA's not specified in the preceding
para will be considered against the criteria set out above and the criteria of
Policy DP4. 
d) Where a proposal is covered by both a SLA and CAT or ENV
policy/designation, the CAT policy or ENV policy/designation will take
precedence. 
b ii) Landscape Character 
New developments must be designed to reflect the landscape characteristics
identified in the Landscape Character Assessment of the area in which they are
proposed. 
Page 106

Page 107

Proposals for new roads and hill tracks associated with rural development must
ensure that their alignment and use minimises visual impact, avoids sensitive natural
heritage and historic environment features, including areas protected for nature
conservation, carbon rich soils and protected species, avoids adverse impacts upon
the local hydrology and takes account of recreational use of the track and links to the
wider network. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application. 
Level 1 -  a flood statement with basic information with regard to flood risk.
Level 2 -  full flood risk assessment providing details of flood risk from all sources,
results of hydrological and hydraulic studies and any appropriate
proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
Page 107

Page 108

c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood
risk will be required and any loss of flood storage capacity mitigated to achieve
a neutral or better outcome. Water resistant materials and construction must be
used where appropriate. Land raising and elevated buildings on structures such
as stilts are unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
Page 108

Page 109

SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side)
(top of bank) 
Less than 1m  6m
1-5m  6-12m
5-15m  12-20m
15m+  20m+ 
Page 109

Page 110

The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP13 FOUL DRAINAGE 
All development within or close to settlements (as defined in the Local Development Plan)
of more than 2,000 population must connect to the public sewerage system unless
connection  is not permitted due to lack of capacity. In such circumstances, temporary
provision of private sewerage systems may be allowed provided Scottish Water has
confirmed investment to address this constraint has been allocated within its investment
Programme and the following requirements have been met; 
• Systems must not have an adverse effect on the water environment
• Systems must be designed and built to a standard which will allow adoption by
Scottish Water
• Systems must be designed such that they can be easily connected to a public sewer
in the future. Typically this will mean providing a drainage line up to a likely point of
connection. 
All development within or close to settlements (as above) of less than 2,000 population will
require to connect to public sewerage except where a compelling case is made otherwise.
Factors to be considered in such a case will include size of the proposed development,
whether the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Where a compelling case is made, a private system may be acceptable provided it does
not pose or add a risk of detrimental effects, including cumulative, to the natural and built
environment, surrounding uses or amenity of the general area. 
Where a private system is deemed to be acceptable, within settlements as above or small
scale development in the countryside, a discharge to land, either full soakaway or raised
mound soakaway, compatible with Technical Handbooks (which sets out guidance on how
proposals may meet the Building  Regulations) must be explored prior to considering a
discharge to surface waters. 
R1  Ordiquish Road  2.6 ha  50 units 
• Access to the site will be from Ordiquish Road and the layout must allow for future
access requirements to R2. 
• Two points of access required. Access arrangements must also take into
consideration access for R4/LONG. 
• Transport Assessment required. The Assessment must take into account other
developments proposed off Ordiquish Road (R2, R4 and LONG). 
• Provision of road improvements required including widening of Ordiquish Road.
Assessment of the condition of the bridge over the Fochabers Burn required.
Assessment of the need for junction improvements required.  
• Footway and cycleway connections to the existing network and school required. 
• A Pocket Park must be provided. 
• Boundary landscaping must be provided. 
• Development of this site must be significantly complete (50%) before
commencement on R2. 
• Drainage Impact Assessment (DIA) required.
Page 110

Page 111

• Demonstrate that there will be no adverse effect on the integrity of the River Spey
Special Area of Conservation (SAC) from development activity causing pollution or
sediment to reach the SAC, or changes to water quality and quantity. 
Page 111

Page 112

Page 112

Page 113

WARD 01_17 
21/02008/APP
24th January 2022
Demolish 2 no agricultural sheds and erect  2 no whisky
storage warehouses at Viewfield Farm Craigellachie
Aberlour Moray
for Caley Casks 
Comments: 
 The application is for a site with an area of 2 or more hectares. 
 Advertised for neighbour notification purposes – notification not possible because
no premises are situated on land to which notification can be sent. 
 No representations have been received. 
Procedure: 
 None. 
Recommendation   
Grant Planning Permission – Subject to the following: 
Conditions/Reasons 
1.  A turning area shall be retained within the curtilage of the site to enable vehicles
to enter and exit in a forward gear. 
Reason: To ensure the provision for vehicles to enter/exit in a forward gear in the
interests of the safety and free flow of traffic on the public road. 
2.  Unless otherwise agreed with the Council, as Planning Authority, in consultation
with the Environmental Health Manager, the use of the development shall only be
permitted between the hours of 0800 to 1630 hours Monday to Thursday and
0800 to 1230 on a Friday. 
Reason: To protect local residents from noise nuisance in ensuring the use of the
development within permitted hours. 
3.  The rating level of noise associated with the development shall not exceed the
background sound level by more than 5 dB(A) at the nearest noise sensitive
dwelling. The background sound level has been determined as an L A 90 (15
mins) of 41 DB, as stated in page 10 of the Noise Impact Assessment supporting
document by FEC Acoustics, dated 13 May 2022, and titled "Noise Impact
Item 6
Page 113

Page 114

Assessment for the proposed additional cask storage at Viewfield farm,
Craigellachie. 21/02008/APP". For the avoidance of doubt, the rating level and
background sound level associated with this condition are defined within BS
4142:2014 Methods for rating and assessing industrial and commercial sound. 
Reason: To protect local residents from noise nuisance by limiting noise
emissions from the use of the development. 
4.  Notwithstanding the provisions of the Town and Country Planning (Use Classes)
(Scotland) Order 1997 (or any order revoking and re-enacting that order) the
approval hereby granted only relates to the use of the two proposed buildings as
Whisky Cask Storage and for no other use or purpose without the prior approval
of the Council, as Planning Authority. 
Reason: In order to retain Local Authority control over the use of the site and to
ensure that consideration can be given to the effects and impact of uses other
than that approved herewith. 
5.  Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (or any order revoking and re-
enacting that order) no development specified in Article 3, Schedule 1, Part 3,
Class 13 shall be carried out without the approval of the Council, as Planning 
Authority. 
Reason: In order to retain control over the use of the site and to ensure that
consideration can be given to the effects and impact of uses other than that
approved herewith. 
6.  The surface water drainage arrangements for the development shall be provided
and maintained in accordance with the approved Drainage Impact Assessment
GC222703 Rev 2 and associated appendices A, B, C and D prepared by Blyth
and Blyth, unless otherwise agreed by the Council, as Planning Authority. These
shall be installed and operational prior to the first use of the buildings hereby
approved. 
Reason: To ensure that surface water drainage is provided timeously and
complies with the principles of SuDS in order to protect the water environment. 
7.  Unless otherwise agreed in writing, no development shall commence until details
of a landscaping scheme have been submitted to, and approved in writing by the
Council, as Planning Authority. This shall be closely based on the Site Plan
(PL02) approved as part of this application and include the following information:- 
i.   Details of landscaping strips to be provided along the northern boundary; 
ii.   Details of additional landscaping strips/groupings along the upper part of the
bank between the entrance to the site and northern boundary and
supplementary planting along the northeast boundary;
iii.   Details of all soft landscaping and planting works, including plans and
schedules showing the location, species and size of each individual tree,
shrub and wild flower area, planting densities and bird boxes. (For avoidance
of doubt this shall only be native species trees, shrubs and wild flowers, and
Page 114

Page 115

trees must be at least 1.5m in height); and 
iv.   Details of the design, including materials, of any proposed retaining walls. 
The landscaping works shall be carried out in accordance with the approved
scheme. 
All planting and seeding as may be comprised in the approved details shall be
carried out in the first planting and seeding season following the completion of
development, unless otherwise stated in the approved scheme. Any trees or
plants which within a period of five years from the completion of the development
die, for whatever reason are removed or damaged shall be replaced in the next
planting season with others of the same size and species. 
Reason: In order to ensure an acceptable level of planting in the interests of the
biodiversity, amenity and appearance of the surrounding countryside. 
8.  No development shall commence until details have been submitted to and
approved by the Council, as Planning Authority in consultation with the
Environmental Health Manager regarding details of an external lighting scheme
for the development (if proposed or required). The lighting scheme shall: 
a)   be designed to minimise the use of external lighting within and around the
boundaries of the site, and the effects of light spills and glare upon the
surrounding area beyond the site boundary; 
b)   provide details of all required/proposed external lighting arrangements,
whether free-standing or affixed to buildings/structures or similar during both
the construction and operation of the development; and 
c)   include the location and design specifications (including both candela and lux
rating information) for all lighting to be installed and the time-periods for
operation together with specifications for all mitigation measures to be
introduced and designed to minimise the impact of lighting within and beyond
the site boundary (for example, light hoods and louvres, orientation and
angle of downward inclination of lamps, self dimming lights, etc.) 
Thereafter, the external lighting arrangements shall be implemented in
accordance with the approved details and no further external lighting shall be
provided, installed or used throughout the lifetime of the development except
where otherwise agreed in writing with the Council, as Planning Authority. 
Reason: Details of the matters specified are lacking from the applicant's
submission and to ensure an acceptable form of development in particular to
minimise the potential for light pollution disturbance upon the visual amenity of the
surrounding area and nearby residential properties. 
9.  No works shall commence on site until a Construction Traffic Management Plan
has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority. The Construction Traffic
Management Plan shall include as a minimum the following information: 
   duration of works; 
   construction programme; 
   anticipated schedule for delivery of materials and plant;
Page 115

Page 116

   full details of the construction traffic route from the A95 Granish - Keith Trunk
Road to the site, including routes to be used for the disposal of any materials
from the site;
   measures to be put in place to safeguard the movements of pedestrians;
   areas identified for parking, delivery loading and unloading, storage of
materials;
   measures to be put in place to prevent material being deposited on the
public road; 
   traffic management measures to be put in place during works and any
specific instructions to drivers. 
Thereafter, the development works shall proceed in accordance with the approved
details, unless otherwise approved in writing by the Council, as Planning Authority
in consultation with the Roads Authority. 
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site through the
provision of details currently lacking. 
10.    Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive dwelling
shall be permitted between 0800 - 1900 hours, Monday to Friday and 0800 - 1300
hours on Saturdays only, and at no other times out with these permitted hours
(including National Holidays) shall construction works be undertaken except
where previously agreed in writing with the Council, as Planning Authority and
where so demonstrated that operational constraints require limited periods of
construction works to be undertaken out with the permitted/stated hours of
working. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours 
11.    Prior to development commencing, a Construction Environmental Management
Plan (CEMP) shall be submitted to and agreed in writing by the Planning
Authority. The plan shall include measures to minimise construction related noise,
vibration, dust and artificial lighting. Thereafter, the development will be carried
out in accordance with the agreed plan. 
Reason: In order that environmental emissions are considered and managed at
the construction phase, in order to protect local residents. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The erection of buildings for whisky storage in this location is considered acceptable
and would not have an adverse impact on the surrounding area. The proposal complies
with the provisions of the development plan and there are no material considerations
that indicate otherwise. 
Page 116

Page 117

List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
A Building Warrant will be required for the proposals. Should you require further
assistance please contact the Building Standards Duty Officer between 2pm and
4pm or telephone on 03001234561.  No appointment is necessary.  Alternatively
e-mail buildingstandards@moray.gov.uk 
THE TRANSPORTATION MANAGER has commented that:- 
Planning consent does not carry with it the right to carry out works within the
public road boundary. 
Public utility apparatus may be affected by this proposal. Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
THE SCOTTISH ENVIONRMENT PROTECTION AGENCY (SEPA), have commented
that:- 
In respect of The Control of Major Accident Hazards regulations 2015 (COMAH),
ethanol spirit is a 'Part 1 - P5c' flammable liquid. The Lower Tier threshold for a
COMAH Establishment is 5,000 tonnes for this hazardous substance, and 50,000
tonnes for an Upper Tier site. SEPA can provide further more detailed regulatory
and technical advice if required, it is advised to contact our waste and industry
team at wasteandindustry@sepa.org.uk. 
SCOTTISH WATER, has commented that:- 
See consultation response dated 26 January 2022. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
PL02  Proposed site layout
PL03  Site sections
PL04  A Location plan
PL05  Elevations and floor plan 
GC22703:90:001  A Proposed drainage layout  
Information to accompany decision: 
Noise Impact Assessment for the proposed additional cask storage at Viewfield farm,
Craigellachie 21/02008/APP.
Page 117

Page 118

Drainage Impact Assessment GC222703 Rev 2 and associated appendices A, B, C
and D 
Page 118

Page 119

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Viewfield Farm
Craigellachie
Planning Application Ref Number: 
21/02008/APP
Location Plan
Applicant Name: 
Caley Casks
Page 119

Page 120

Site Location
Page 120

Page 121

Site Plan
Page 121

Page 122

Existing site plan
Page 122

Page 123

Elevations
Page 123

Page 124

Site sections
Page 124

Page 125

Proposed drainage layout
Page 125

Page 126

16/01664/APP
Page 126

Page 127

Photo 1
16/
Page 127

Page 128

Photo 2
16/
Page 128

Page 129

Photo 3
16/
Page 129

Page 130

Photo 4
16/
Page 130

Page 131

Photo 5
16/
Page 131

Page 132

PLANNING APPLICATION: 21/02008/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1. THE PROPOSAL 
   Planning permission is sought for the erection of 2 whisky storage
warehouses (numbered as units 2 and 3 on the site plan). 
   Each proposed warehouse has a footprint of 2204 sqm, is 14.7 m in
height and is capable of holding up to 28,000 casks of whisky.
   External materials include profiled metal sheeting in green on the roof and
walls with metal doors/roller doors in grey. 
   Existing access arrangements to the site will be utilised, the bank on the
north side of the access is to be altered to form a larger access. A new
porous tar track is proposed for access to the warehouses. Associated
works include the removal of an embankment to accommodate the 2
warehouses and regrading of part of the bank on the eastern side of the
site to allow for Fire Engine Turning Circle and firefighting water tanks.  
   No external storage of casks is proposed. 
   Proposed surface water drainage arrangements comprise below ground
drainage pipework around the sheds and an associated detention basin
located to the south of the proposed warehouses below unit 1. 
   Landscaping is proposed along the north boundary. 
   Supporting documents include a Drainage Impact Assessment
(amended), Noise Impact Assessment and a supporting statement which
includes a location justification. 
2.   THE SITE 
   The application site, set above the A95 Trunk Road, is located to the west
of Craigellachie and covers a total area of 6.59 ha. 
   The proposed sheds would be located in the middle of the site. Two
existing agricultural sheds are to be demolished to allow for space for the
warehouses. The existing sheds are not up to the current standards or
regulations for the storage of whisky casks. 
   There are currently 4 sheds within the established whisky storage site, 3
of these sheds (units 1, 2 and 3) were granted planning permission
(19/00211/APP) in October 2019 for a change of use from agriculture to
storage for whisky casks. Units 2 and 3 are to be demolished (Building
Warrant issued (21/00520/BW), May 2021) as they were not up to the
current standards or regulations for the storage of whisky casks. Two
further sheds for whisky storage (Units 4 and 5) were granted planning
permission (20/00197/APP) in November 2020.
Page 132

Page 133

   The site is surrounded by agricultural land and dispersed housing, and
mature trees to the south.  
   The dwelling of ‘Glen Spey’ sits within the red line boundary as submitted
within the western part of the site (but is excluded from the site area). 
   The site is within The Spey Valley Special Landscape Area (SLA) as
identified in the Moray Local Development Plan 2020. 
3.   HISTORY 
20/00197/APP – Erection of two attached whisky storage sheds (units 4 and 5)
granted planning permission at a Planning and Regulatory Services Committee
on 11 November 2020. 
19/00211/APP - Change of use of three agricultural buildings as secure storage
for whisky casks (Use Class 6) granted permission at a Planning and
Regulatory Services Committee on 9 October 2019. 
12/00873/APP – Erection of grain store and general purpose shed granted
permission under delegated powers on 13 July 2012. (Building 3 on the
submitted plans). 
10/00376/APP – Erect agricultural building granted permission under delegated
powers on 15 April 2010. (Building 1 on the submitted plans). 
09/02257/AGR – Erection of agricultural building under prior notification
accepted under delegated powers on 21 January 2010. (Building 2 on the
submitted plans). 
4.   POLICY - SEE APPENDIX 
5.   ADVERTISEMENTS 
5.1   Advertised for neighbour notification purposes. 
6.   CONSULTATIONS 
Contaminated Land – No objections. 
Scottish Water – No objections. 
Transport Scotland – No objections. 
Transportation Manager – No objection subject to conditions and informatives
being attached to the consent. The conditions relate to a turning area being
retained within the curtilage to enable vehicles to enter and exit in a forward
gear and a construction traffic management plan. 
Archaeology – No objections. 
Page 133

Page 134

SEPA – No objections. Informative attached regarding The Control of major
Hazards Regulations 2015 (COMAH). 
Moray Flood Risk Management – No objections subject to condition relating
to adherence with the submitted Drainage Impact Assessment. 
Environmental Health – Following submission of a Noise Impact Assessment,
no objections subject to conditions limiting the operating hours of the deliveries
and activities associated with the use being carried out between 0800 – 1630
Monday to Thursday and 0800 – 1230 on a Friday, limitations of noise
emissions, controls of construction work hours and submission of a
Construction Environmental Management Plan to control/manage
environmental emissions (noise, vibration, dust and artificial lighting) during the
construction phase. 
7.   OBJECTIONS-REPRESENTATIONS 
No representations received. 
8.   OBSERVATIONS 
8.1  Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the development plan i.e. the adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. The main planning issues are considered below: 
8.2  Siting/Character and Design (PP2, DP1, DP5 and EP3) 
Policy PP2 Sustainable Economic Growth supports proposals which deliver
sustainable economic growth where the natural and built environment is
safeguarded, there is clear locational need and any potential impacts can be
satisfactorily mitigated. 
8.2.1  Policy DP1 Development Principles, sets out detailed criteria to ensure
development proposals satisfy siting, design and servicing requirements. This
also requires submission of supporting information to inform assessment where
required. 
8.2.2 Policy DP5 Business and Industry states proposals for new business
development and extensions to existing businesses in rural locations including
tourism and distillery operations will be supported where there is a locational
need and is of a high standard of design appropriate to the rural environment. 
8.2.3 Policy EP3 Special Landscape Areas and Landscape Character (The Spey
Valley) aims to protect landscapes from inappropriate development.
Development proposals within SLA’s are only permitted where they do not
prejudice the special qualities of the designated area set out in the Moray Local
Designation Review. 
8.2.4 The proposed whisky storage sheds located within The Spey Valley SLA are in
keeping with the site in terms of their scale and proportions and design. The
Page 134

Page 135

development positioned in the middle of the site alongside other buildings will
be largely shielded from view from the surrounding area including from the
public road (A95 and minor access road) due to the topography/landform in this
location and screening provided by nearby coniferous trees. The external
materials of green cladding on the roof and walls will allow the proposal to
integrate sensitively into the landscape when viewed against the backdrop of
the coniferous trees and landform/agricultural field above it. 
8.2.5 Proposed new landscaping along the north, northeast and northwest site
boundaries (to be addressed by condition) would further help to ensure that the
development integrates sensitively with the landscape. 
8.2.6 Overall, the development will be viewed in the context of the existing buildings
on the site and would not have an adverse impact on the special qualities of the
landscape in this location. 
8.2.7 The agent has also provided information detailing a locational justification for
the proposal in order to satisfy policies PP2 and DP5. This states that the
proposal site as well as having whisky storage as an established use it is well
placed within the Speyside Whisky Region, there are approx. 60 distilleries
within a 50 mile radius and that there is a current shortage of storage facilities
within the region, and given these factors it is considered that there is sufficient
justification for the proposal in this location. 
8.2.8 In light of the above, the proposal is considered to satisfy the requirements of
policies PP2, DP1, DP5 and EP3 in relation to siting, landscape character and
design. 
8.2.9 A condition is recommended (as per planning permission 20/00197/APP) to
limit the scope of the operation to that proposed, as any alternative use within
use class 6 (storage and distribution) may give rise to other impacts on the
surrounding area and the infrastructure serving the site; the condition would
allow the Council, as Planning Authority to retain control over the use of the site
and ensure that consideration can be given to the effects and impact of uses
other than that approved. A further condition is also recommended to prevent
the change of use of the building(s) to use classes 4 (business) and 5 (general
industrial), which permitted development rights allow. 
8.3 Pollution (Noise) (EP14) 
EP14 seeks to control pollution (air, water, soil, light and noise) by ensuring
submission of detailed assessments with applications. 
8.3.1 A Noise Impact Assessment (NIA) was provided at the request of the Council’s
Environmental Health Manager, in order that consideration could be given to
the impact of the proposed use upon a nearby dwelling (Glen Spey). The NIA
concluded that the impact of the proposed development upon the amenity of
neighbouring residents would be low, with noise levels at the property (inside
and out) being found to be within acceptable levels. On this basis the proposal
would not result in an unacceptable disturbance to residential amenity. 
8.3.2 The Environmental Health Manager has assessed this information and has
raised no objection to the grant of permission subject to conditions controlling
Page 135

Page 136

operating hours, noise levels, construction work hours and submission of a
Construction Environmental Management Plan to control/manage
environmental emissions (noise, vibration, dust and artificial lighting) during the
construction phase. 
8.3.3 Subject to the compliance with above conditions the proposal would accord
with policy EP14. 
8.4 Biodiversity (EP2) 
Policy EP2 requires development proposals to, where possible, retain, protect
and enhance all biological interest and provide for their appropriate
management. This also states that proposals for 1000 sqm or more of
commercial floorspace must create new or where appropriate enhance natural
habitats of ecological value. 
8.4.1 Given the proposal site is on the site of previous sheds there is no notable
biodiversity value, however the biodiversity of the site can be enhanced. As per
policy EP2 new landscaping shall be provided on the north, northwest and
northeast boundaries of the site. A condition shall be attached to the consent
requiring submission/approval of further details including planting
specifications, numbers, species mix, sizes, spacing and maintenance of the
landscaping, bird nest boxes and thereafter implementation. Subject to
compliance with this condition and implementation of these measures policy
EP2 is met. 
8.5 Access and Parking (DP1 and PP3) 
Policy DP1 requires that proposals must provide a safe entry and exit from the
development and conform with the Council’s current policy on Parking
Standards. Policy PP3 requires development to be planned and co-ordinated
with infrastructure to ensure that places function properly and proposals are
adequately served by infrastructure and services. 
8.5.1 Previous consents on the site 19/00211/APP and 20/00197/AP were granted
subject to Transportation conditions relating to the provision of 3 new passing
places on the U58H Viewfield Road and carriageway widening improvements at
the junction of the U58H and the A95 to accommodate overrunning of larger
vehicles associated with the development. These works have been completed
(Roads Construction Consent RCC 594 relates). 
8.5.2 The Transportation Section has been consulted and has raised no objection to
the grant of permission subject to conditions relating to a turning area being
retained within the curtilage of the site to enable vehicles to enter and exit in a
forward gear and submission/approval of a construction traffic management
plan. 
8.5.3 Transport Scotland were also consulted on the proposal and have raised no
objections. 
8.5.4 In terms of access and parking, subject to the conditions as recommended, the
proposal complies with policy DP1 and PP3. 
Page 136

Page 137

8.6 Drainage and Flooding (DP1, PP3 and EP12) 
Policies DP1 Development Principles, PP3 Infrastructure and Services and
EP12 Management and Enhancement of the Water Environment set out
detailed criteria to ensure proposals meet siting, design and servicing
requirements including provision of SuDS. This includes requirements for
surface water from new development to be dealt with in a sustainable manner
that has a neutral effect on the risk of flooding or which reduces the risk of
flooding. 
8.6.1 A Drainage Impact Assessment has been submitted with the application which
details the proposed surface drainage arrangements for the proposed
development.  Roof gutters and filter trenches to road edges are to be installed
over the full area of development. All new drainage will in turn lead to an
attenuation pond, with a controlled outfall rate dispersing into a suitably
designed soakaway pit filled with free draining stone. An allowance for Climate
Change of 35% has been allowed for in line with current guidance for North
East Scotland. 
8.6.2 Moray Flood Risk Management have assessed this information, are content
with its findings and have raised no objections to the proposal. 
8.6.3 A condition shall be attached requiring the proposal to adhere with the
Drainage Impact Assessment and associated plans. 
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The erection of buildings for whisky storage in this location is considered
acceptable and would not have an adverse impact on the surrounding area.
The proposal complies with the provisions of the development plan and there
are no material considerations that indicate otherwise.   
Author/Contact
Officer:
Emma Mitchell            
Planning Officer
Ext: 01343 563326 
Beverly Smith
Development Management & Building Standards Manager
Page 137

Page 138

APPENDIX 
POLICY 
Proposed Moray Local Development Plan 2020 
PP1 PLACEMAKING
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(i) Character and Identity
• Create places that are distinctive to prevent homogenous 'anywhere'
development;
• Provide a number of character areas reflecting site characteristics that
have their own distinctive identity and are clearly distinguishable;
• Provide distinctiveness between and in each character area through a
combination of measures including variation in urban form, street
structure/network, architecture and masonry, accent features (such as
porches), surrounds and detailing, materials (buildings and surfaces),
colour, boundary treatments, hard/soft landscaping and a variety of
approaches to tree species and planting that emphasises the hierarchy of
open spaces and streets within a cohesive design strategy for the whole
development;
• Distinctiveness must be reinforced along main thoroughfares, open
spaces and places where people may congregate such as
shopping/service centres;
• Retain, incorporate and/or respond to relevant elements of the landscape
such as topography and planted features, natural and historic
environment, and propose street naming (in residential developments of
20 units and above, where proposed names are to be submitted with the
planning application) to retain and enhance local associations; 
Page 138

Page 139

(ii) Healthier, Safer Environments
• Designed to prevent crime, fear of crime and anti-social behaviour with
good levels of natural surveillance and security using treatments such as
low boundary walls, dual frontages (principal rooms) and well-lit routes to
encourage social interaction.  Unbroken high boundary treatments such
as wooden fencing and blank gables onto routes, open spaces and
communal areas will not be acceptable.
• Designed to encourage physical exercise for people of all abilities.
• Create a distinctive urban form with landmarks, key buildings, vistas,
gateways and public art to provide good orientation and navigation
through the development.
• Provide a mix of compatible uses, where indicated within settlement
statements, integrated into the fabric of buildings within the street.
• Prioritise pedestrians and cyclists by providing a permeable movement
framework that incorporates desire lines (including connecting to and
upgrading existing desire lines) and is fully integrated with the surrounding
network to create walkable neighbourhoods and encourage physical
activity.
• Integrate multi- functional active travel routes, green and open space into
layout and design, to create well connected places that encourage
physical activity, provide attractive spaces for people to interact and to
connect with nature.
• Create safe streets that influence driver behaviour to reduce vehicle
speeds that are appropriate to the local context such as through shorter
streets, reduced visibility and varying the building line.
• Provide seating opportunities within streets, paths and open spaces for all
generations and mobility's to interact, participate in activity, and rest and
reflect.
• Provide for people with mobility problems or a disability to access
buildings, places and open spaces.
• Create development with public fronts and private backs. 
• Maximise environmental benefits through the orientation of buildings,
streets and open space to maximise the health benefits associated with
solar gain and wind shelter. 
(iii) Housing Mix
• Provide a wide range of well integrated tenures, including a range of
house types and plot sizes for different household sizes, incomes and
generations and meet the affordable and accessible requirements of
policy DP2 Housing.
• All tenures of housing should have equal access to amenities, greenspace
and active travel routes. 
(iv) Open Spaces/Landscaping
• Provide accessible, multi-functional open space within a clearly defined
hierarchy integrated into the development and connected via an active
travel network of green/blue corridors that are fully incorporated into the
development and to the surrounding area, and meet the requirements of
policy EP5 Open Space and the Open Space Strategy Supplementary
Guidance and Policy EP12 Managing the Water Environment and
Page 139

Page 140

Drainage Impact Assessment for New Developments Supplementary
Guidance.
• Landscaped areas must provide seasonal variation, (mix of planting and
colour) including native planting for pollination and food production.
• Landscaping areas that because of their size, shape or location would not
form any useable space or that will not positively contribute to the
character of an area will not contribute to the open space requirements of
Policy EP4 Open Space.
• Semi-mature tree planting and shrubs must be provided along all routes
with the variety of approaches reflecting and accentuating the street
hierarchy.
• Public and private space must be clearly defined.
• Play areas (where identified) must be inclusive, providing equipment so
the facility is for every child/young person regardless of ability and
provided upon completion of 50% of the character area.
• Proposals must provide advance landscaping identified in site
designations and meet the quality requirements of policy EP5 Open
Space.
• Structural landscaping must incorporate countryside style paths (such as
bound or compacted gravel) with waymarkers.
• Maintenance arrangements for all paths, trees, hedging, shrubs, play/
sports areas, roundabouts and other open/ green spaces and blue/green
corridors must be provided. 
v) Biodiversity
• Create a variety of high quality multi- functional green/blue spaces and
networks that connect people and nature, that include trees, hedges and
planting to enhance biodiversity and support habitats/wildlife and comply
with policy EP2 Biodiversity and Geodiversity and EP5 Open Space.
• A plan detailing how different elements of the development will contribute
to supporting biodiversity must be included in the design statement
submitted with the planning application.
• Integrate green and blue infrastructure such as swales, permeable paving,
SUDS ponds, green roofs and walls and grass/wildflower verges into
streets, parking areas and plots to sustainably address drainage and
flooding issues and enhance biodiversity from the outset of the
development.
• Developments must safeguard and where physically possible extend or
enhance wildlife corridors and green/blue networks and prevent
fragmentation of existing habitats. 
(vi)   Parking
• Car parking must not dominate the streetscape to the front or rear of
properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum
of 50% car parking within the front curtilage or on street, subject to the
visual impact being mitigated by hedging, low stone boundary walls or
other acceptable treatments that enhance the streetscape.
• Provide semi-mature trees and planting within communal private and
public/visitor parking areas and on-street parking at a maximum interval of
4 car parking spaces.
Page 140

Page 141

• Secure and covered cycle parking and storage, car sharing spaces and
electric car charging points must be provided in accordance with policy
DP1 Development Principles.
• Parking areas must use a variation in materials to reduce the visual
impact on the streetscene. 
(vii)  Street Layout and Detail
• Provide a clear hierarchy of streets reinforced through street width,
building density and street and building design, materials, hard/soft
landscaping and a variety of approaches to tree planting and shrubs.
• Streets and connecting routes should encourage walking and cycling over
use of the private car by providing well connected, safe and appealing
routes.
• Design junctions to prioritise pedestrians, accommodate active travel and
public transport and service/emergency vehicles to reflect the context and
urban form and ensure that the street pattern is not standardised.  
• Dead-end streets/cul-de-sacs will only be selectively permitted such as on
rural edges or where topography, site size, shape or relationship to
adjacent developments prevent an alternative more permeable layout.
These must be short, serving no more than 10 units and provide walking
and cycling through routes to maximise connectivity to the surrounding
area.
• Where a roundabout forms a gateway into, or a landmark within, a town
and/or a development, it must be designed to create a gateway feature or
to contribute positively to the character of the area.
• Design principles for street layouts must be informed by a Street
Engineering Review (SER) and align with Roads Construction Consent
(RCC) to provide certainty that the development will be delivered as per
the planning consent. 
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan.¬¬¬ 
(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
Page 141

Page 142

i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space. 
ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS. 
ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
Page 142

Page 143

and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use. 
b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment. 
Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Page 143

Page 144

Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
Page 144

Page 145

e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. Alterations
and extensions must be compatible with the character of the existing building in
terms of design, form, choice of materials and positioning and meet all other
relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
Page 145

Page 146

d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2. 
f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
Page 146

Page 147

f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry. 
h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
DP5 BUSINESS & INDUSTRY
a) Development of employment land is supported to deliver the aims of the Moray
Economic Strategy.  A hierarchical approach will be taken when assessing proposals
for business and industrial uses. New and existing employment designations are set
out in Settlement Statements and their description identifies where these fall within
the policy hierarchy. 
Proposals must comply with Policy DP1, site development requirements within town
and village statements, and all other relevant policies within the Plan. Office
development that will attract significant numbers of people must comply with Policy
DP7 Retail/Town Centres. 
Efficient energy and waste innovations should be considered and integrated within
developments wherever possible. 
b) Business Parks
Business parks will be kept predominantly for 'high-end' businesses such as those
related to life sciences and high technology uses.  These are defined as Class 4
(business) of the Town and Country Planning (Use Classes) (Scotland) Order 1997.
This applies to new proposals as well as redevelopment within established Business
Parks. 
Proposals for the development of new business parks must adhere to the key design
principles set out in town statements or Development Frameworks adopted by the
Council.   
c) Industrial Estates
Industrial Estates will be primarily reserved for uses defined by Classes 4 (business),
5 (general) and 6 (storage and distribution) of the Town and Country Planning (Use
Classes) (Scotland) Order 1997. This applies to new proposals as well as
redevelopment within established Industrial Estates.  Industrial Estates could be
suitable sites for waste management facilities.   
d) Existing Business Areas
Long established business uses will be protected from non-conforming uses (e.g.
housing).  The introduction or expansion of non-business uses (e.g. retail) will not be
permitted, except where the total redevelopment of the site is proposed.   
e) Other Uses
Class 2 (business and financial), 3 (food and drink), 11 (assembly and leisure) and
activities which do not fall within a specific use class (sui generis), including waste
management facilities will be considered in relation to their suitability to the business
or industrial area concerned, their compatibility with neighbouring uses and the
supply of serviced employment land.  Retail uses will not be permitted unless they
Page 147

Page 148

are considered ancillary to the principal use (e.g. manufacture, wholesale).  For this
purpose, 'ancillary' is taken as being linked directly to the existing use of the unit and
comprising no more than 10% of the total floor area up to a total of 1,000 sq metres
(gross) or where a sequential approach in accordance with town centre first
principles has identified no other suitable sites and the proposal is in accordance
with all other relevant policies and site requirements are met. 
f) Areas of Mixed Use
Proposals for a mix of uses where site specific opportunities are identified within
Industrial Estate designations in the Settlement Statement, will be considered
favourably where evidence is provided to the authority's satisfaction that the
proposed mix will enable the servicing of employment land and will not compromise
the supply of effective employment land.  A Development Framework that shows the
layout of the whole site, range of uses, landscaping, open space and site specific
design requirements must be provided. The minimum levels of industrial use
specified within designations must be achieved on the rest of the site. 
g) Rural Businesses and Farm Diversification
Proposals for new business development and extensions to existing businesses in
rural locations including tourism and distillery operations will be supported where
there is a locational need for the site and the proposal is in accordance with all other
relevant policies. 
A high standard of design appropriate to the rural environment will be required and
proposals involving the rehabilitation of existing properties (e.g. farm steadings) to
provide business premises will be encouraged. 
Outright retail activities will be considered against policy DP7, and impacts on
established shopping areas, but ancillary retailing (e.g. farm shop) will generally be
acceptable. 
Farm diversification proposals and business proposals that will support the economic
viability of the farm business are supported where they meet the requirements of all
other relevant Local Development Plan policies. 
h) Inward Investment Sites
The proposals map identifies a proposed inward investment site at Dallachy which is
safeguarded for a single user business proposal seeking a large (up to 40ha), rural
site. Additional inward investment sites may be identified during the lifetime of the
Plan. 
Proposals must comply with Policy DP1 and other relevant policies. 
EP1 NATURAL HERITAGE DESIGNATIONS
a) European Site designations
Development likely to have a significant effect on a European Site and which is not
directly connected with or necessary to the conservation management of that site
must be subject to an appropriate assessment of the implications for its conservation
objectives. Proposals will only be approved where the appropriate assessment has
ascertained that there will be no adverse effect on the integrity of the site. 
Page 148

Page 149

In exceptional circumstances, proposals that could affect the integrity of a European
Site may be approved where:
i)            There are no alternative solutions, and 
ii) There are imperative reasons of over-riding public interest including those of
a social or economic nature, and 
iii) Compensatory measures are provided to ensure that the overall coherence
of the Natura network is protected. 
For European Sites hosting a priority habitat or species (as defined in Article 1 of the
The Conservation (Natural Habitat & c.) Regulations 1994), prior consultation with
the European Commission via Scottish Ministers is required unless the imperative
reasons of overriding public interest relate to human health, public safety or
beneficial consequences of primary importance to the environment. 
b) National designations
Development proposals which will affect a National Park, National Scenic Area
(NSA), Site of Special Scientific Interest (SSSI) or National Nature Reserve will only
be permitted where:
i) The objectives of designation and the overall integrity of the area will not be
compromised; or
ii) Any significant adverse effects on the qualities for which the site has been
designated are clearly outweighed by social, environmental or economic
benefits of national importance. 
c) Local Designations
Development proposals likely to have a significant adverse effect on Local Nature
Reserves, wildlife sites or other valuable local habitats will be refused unless it can
be demonstrated that;
i)   Public benefits clearly outweigh the nature conservation value of the site, and
ii) There is a specific locational requirement for the development, and
iii) Any potential impacts can be satisfactorily mitigated to conserve and enhance
the site's residual conservation interest. 
d) European Protected Species
European Protected Species are identified in the Habitats Regulations 1994 (as
amended in Scotland). Where a European Protected Species may be present or
affected by development or activity arising from development, a species survey and
where necessary a Species Protection Plan should be prepared to accompany the
planning application, to demonstrate how the Regulations will be complied with. The
survey should be carried out by a suitably experienced and licensed ecological
surveyor. 
Proposals that would have an adverse effect on European Protected Species will not
be approved unless; 
• The need for development is one that is possible for SNH to grant a license for
under the Regulations (e.g. to preserve public health or public safety).
• There is no satisfactory alternative to the development.
• The development will not be detrimental to the maintenance of the favourable
conservation status of the species. 
Page 149

Page 150

e) Other protected species
Wild birds and a variety of other animals are protected under domestic legislation,
such as the Wildlife and Countryside Act 1981 (as amended in Scotland by the
Nature Conservation (Scotland) Act 2004 and the Wildlife and Natural Environment
(Scotland) Act 2011), Protection of Badgers Act 1992 and Marine (Scotland) Act
2010. Where a protected species may be present or affected by development or
activity arising from development, a species survey and where necessary a Species
Protection Plan should be prepared to accompany the planning application to
demonstrate how legislation will be complied with. The survey should be carried out
by a suitably experienced ecological surveyor, who may also need to be licensed
depending on the species being surveyed for. 
Proposals which would have an adverse effect on badgers or their setts must be
accompanied by a Badger Protection Plan demonstrating how impacts will be
avoided, mitigated, minimised or compensated for. 
EP3 SPECIAL LANDSCAPE AREAS AND LANDSCAPE CHARACTER
i)  Special Landscape Areas (SLA's)
Development proposals within SLA's will only be permitted where they do not
prejudice the special qualities of the designated area set out in the Moray Local
Landscape Designation Review, adopt the highest standards of design in
accordance with Policy DP1 and other relevant policies, minimises adverse impacts
on the landscape and visual qualities the area is important for, and are for one of the
following uses; 
a) In rural areas (outwith defined settlement and rural grouping boundaries);
i) Where the proposal involves an appropriate extension or change of     
use to existing buildings, or
ii) For uses directly related to distilling, agriculture, forestry and fishing which
have a clear locational need and demonstrate that there is no alternative
location, or
iii) For nationally significant infrastructure developments identified in the
National Planning Framework, 
b) In urban areas (within defined settlement, rural grouping boundaries and LONG
designations);
i) Where proposals conform with the requirements of the settlement
statements, Policies PP1, DP1 and DP3 as appropriate and all other
policy requirements, and
ii) Proposals reflect the traditional settlement character in terms of siting and
design. 
c) The Coastal (Culbin to Burghead, Burghead to Lossiemouth, Lossiemouth to  
Portgordon, Portgordon to Cullen Coast), Cluny Hill, Spynie, Quarrywood and
Pluscarden SLA's are classed as " sensitive" in terms of Policy DP4 and no
new housing in the open countryside will be permitted within these SLA's. 
Proposals for new housing within other SLA's not specified in the preceding
para will be considered against the criteria set out above and the criteria of
Policy DP4. 
Page 150

Page 151

d) Where a proposal is covered by both a SLA and CAT or ENV
policy/designation, the CAT policy or ENV policy/designation will take
precedence. 
b ii) Landscape Character
New developments must be designed to reflect the landscape characteristics
identified in the Landscape Character Assessment of the area in which they are
proposed. 
Proposals for new roads and hill tracks associated with rural development must
ensure that their alignment and use minimises visual impact, avoids sensitive natural
heritage and historic environment features, including areas protected for nature
conservation, carbon rich soils and protected species, avoids adverse impacts upon
the local hydrology and takes account of recreational use of the track and links to the
wider network. 
EP2 BIODIVERSITY
All development proposals must, where possible, retain, protect and enhance features of
biological interest and provide for their appropriate management.  Development must
safeguard and where physically possible extend or enhance wildlife corridors and
green/blue networks and prevent fragmentation of existing habitats. 
Development should integrate measures to enhance biodiversity as part of multi-functional
spaces/ routes. 
Proposals for 4 or more housing units or 1000 m2 or more of commercial floorspace must
create new or, where appropriate, enhance natural habitats of ecological and amenity
value. 
Developers must demonstrate, through a Placemaking Statement where required by
Policy PP1 which incorporates a Biodiversity Plan, that they have included biodiversity
features in the design of the development. Habitat creation can be achieved by providing
links into existing green and blue networks, wildlife friendly features such as wildflower
verges and meadows, bird and bat boxes, amphibian friendly kerbing, wildlife crossing
points such as hedgehog highways and planting to encourage pollination, wildlife friendly
climbing plants, use of hedges rather than fences, incorporating biodiversity measures into
SUDS and retaining some standing or lying dead wood, allotments, orchards and
woodlands. 
Where development would result in loss of natural habitats of ecological amenity value,
compensatory habitat creation will be required where deemed appropriate. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Page 151

Page 152

Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application. 
Level 1 -  A flood statement with basic information with regard to flood risk.
Level 2 -  Full flood risk assessment providing details of flood risk from all
sources, results of hydrological and hydraulic studies and any
appropriate proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
Page 152

Page 153

(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood
risk will be required and any loss of flood storage capacity mitigated to achieve
a neutral or better outcome. Water resistant materials and construction must be
used where appropriate. Land raising and elevated buildings on structures such
as stilts are unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
Page 153

Page 154

erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side)
(top of bank) 
Less than 1m  6m
1-5m  6-12m
5-15m  12-20m
15m+  20m+ 
The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP14 POLLUTION, CONTAMINATION & HAZARDS
a)  Pollution
Development proposals which may cause significant air, water, soil, light or noise
pollution or exacerbate existing issues must be accompanied by a detailed
assessment report on the levels, character and transmission of the potential pollution
with measures to mitigate impacts. Where significant or unacceptable impacts
cannot be mitigated, proposals will be refused.   
b) Contamination
Development proposals on potentially contaminated land will be approved where
they comply with other relevant policies and; 
i)   The applicant can demonstrate through site investigations and risk assessment,
that the site is in a condition suitable for the proposed development and is not
causing significant pollution of the environment; and
Page 154

Page 155

ii) Where necessary, effective remediation measures are agreed to ensure the
site is made suitable for the new use and to ensure appropriate disposal and/ or
treatment of any hazardous material. 
c) Hazardous sites
Development proposals must avoid and not impact upon hazardous sites or result in
public safety concerns due to proximity or use in the vicinity of hazardous sites. 
EP7 FORESTRY, WOODLANDS AND TREES
a) Moray Forestry and Woodland Strategy
Proposals which support the economic, social and environmental objectives and
projects identified in the Moray Forestry and Woodlands Strategy will be supported
where they meet the requirements of other relevant Local Development Plan
policies.  The council will consult Scottish Forestry on proposals which are
considered to adversely affect forests and woodland.  Development proposals must
give consideration to the relationship with existing woodland and trees including
shading, leaf/needle cast, branch cast, wind blow, water table impacts and
commercial forestry operations. 
b) Tree Retention and Survey
Proposals must retain healthy trees and incorporate them within the proposal unless
it is technically unfeasible to retain these.  Where trees exist on or bordering a
development site, a tree survey, tree protection plan and mitigation plan must be
provided with the planning application if the trees or trees bordering the site (or their
roots) have the potential to be affected by development and construction activity. 
Proposals must identify a safeguarding distance to ensure construction works,
including access and drainage arrangements, will not damage or interfere with the
root systems in the short or longer term.  A landscaped buffer may be required where
the council considers that this is required to maintain an appropriate long term
relationship between proposed development and existing trees and woodland. 
Where it is technically unfeasible to retain trees, compensatory planting on a one for
one basis must be provided in accordance with (e) below. 
c) Control of Woodland Removal 
In support of the Scottish Government's Control of Woodland Removal Policy,
Woodland removal within native woodlands identified as a feature of sites protected
under Policy EP1 or woodland identified as Ancient Woodland will not be supported. 
In all other woodlands development which involves permanent woodland removal will
only be permitted where it would achieve significant and clearly defined additional
public benefits (excluding housing) and where removal will not result in unacceptable
adverse effects on the amenity, landscape, biodiversity, economic or recreational
value of the woodland or prejudice the management of the woodland. 
Where it is proposed to remove woodland, compensatory planting at least equal to
the area to be felled must be provided in accordance with e) below. 
d) Tree Preservation Orders and Conservation Areas
The council will serve Tree Preservation Orders (TPO's) on potentially vulnerable
trees which are of significant amenity value to the community as whole, trees that
contribute to the distinctiveness of a place or trees of significant biodiversity value.
Page 155

Page 156

Within Conservation Areas, the council will only agree to the felling of dead, dying, or
dangerous trees. Trees felled within Conservation Areas or subject to TPO must be
replaced, unless otherwise agreed by the council. 
e) Compensatory Planting
Where trees or woodland are removed in association with development, developers
must provide compensatory planting to be agreed with the planning authority either
on site, or an alternative site in Moray which is in the applicant's control or through a
commuted payment to the planning authority to deliver compensatory planting and
recreational greenspace. 
GUIDANCE TREES AND DEVELOPMENT
Trees are an important part of Moray's towns and villages and surrounding countryside,
adding colour and interest to the townscape and a sense of nature in our built
environment. They contribute to the diversity of the countryside, in terms of landscape,
wildlife habitat and shelterbelts. Trees also have a key role to play in terms of climate
change by helping to absorb carbon dioxide which is one of the main greenhouse gases
that cause global warming. 
The cumulative loss of woodlands to development can result in significant loss of
woodland cover. In compliance with the Scottish Government Control of Woodland
Removal policy, woodland removal should only be allowed where it would achieve
significant and clearly defined additional public benefits. In appropriate cases a proposal
for compensatory planting may form part of this balance. Where woodland is to be
removed then the Council will require compensatory planting to be provided on site, on
another site in Moray within the applicant's control or through a commuted payment to the
Council towards woodland and greenspace creation and enhancement. Developers
proposing compensatory planting are asked to follow the guidance for site assessment
and woodland design as laid out in Scottish Forestry's "Woodland Creation, Application
Guidance" and its subsequent updates, when preparing their proposal. 
The Council requires a Tree Survey and Tree Protection Plan to be submitted by the
applicant with any planning application for detailed permission on designated or windfall
sites which have trees on them. The survey should include a schedule of trees and/or
groups of trees and a plan showing their location, along with the following details; 
• Reference number for each tree or group of trees.
• Scientific and common names.
• Height and canopy spread in metres (including consideration of full height and
spread).
• Root protection area.
• Crown clearance in metres.
• Trunk diameters in metres (measures at 1.5m above adjacent ground level for single
stem trees or immediately above the root flare for multi stemmed trees).
• Age and life expectancy.
• Condition (physiological and structural).
• Management works required.
• Category rating for all trees within the site (U, A, B or C *). This arboricultural
assessment will be used to identify which trees are suitable for retention within the
proposed development. 
Page 156

Page 157

*BS5837 provides a cascading quality assessment process for categorisation of trees
which tree surveys must follow. An appropriately scaled tree survey plan needs to
accompany the schedule. The plan should be annotated with the details of the tree
survey, showing the location, both within and adjacent to the site, of existing trees, shrubs
and hedgerows. Each numbered tree or groups of trees should show the root protection
area and its category U, A, B, C. 
Based on the guidance in BS5837, only category U trees are discounted from the Tree
Survey and Tree Protection Plan process. Trees in category A and B must be retained,
with category C trees retained as far as practicable and appropriate. Trees proposed for
removal should be replaced with appropriate planting in a landscape plan which should
accompany the application. Trees to be retained will likely be set out in planning
conditions, if not already covered by a Tree Preservation Order. 
If a tree with habitat value is removed, then measures for habitat reinstatement must be
included in the landscape plan. It is noted that in line with part b) of policy EP7 where
woodland is removed compensatory planting must be provided regardless of tree
categorisation." 
A Tree Protection Plan (TPP) must also be submitted with planning applications,
comprising a plan and schedule showing; 
• Proposed design/ layout of final development, including accesses and services.
• Trees to be retained- with those requiring remedial work indicated.
• Trees to be removed.
• Location (and specification) of protective fencing around those trees to be retained
based on the Root Protection Area. 
The TPP should show how the tree survey information has informed the design/ layout
explaining the reasoning for any removal of trees. 
Landscape Scheme
Where appropriate a landscape scheme must be submitted with planning applications,
clearly setting out details of what species of trees, shrubs and grass are proposed, where,
what standard and when planting will take place. Landscape schemes must aim to deliver
multiple benefits in terms of biodiversity, amenity, drainage and recreation as set out in
policy. 
The scheme should also set out the maintenance plan. Applicants/ developers will be
required to replace any trees, shrubs or hedges on the site which die, or are dying,
severely damaged or diseased which will be specified in planning conditions. 
Tree species native to Scotland are recommended for planting in new development -
Alder, Aspen, Birch, Bird Cherry, Blackthorn, Crab Apple, Elm, Gean, Hawthorn, Hazel,
Holly, Juniper, Sessile Oak, Rowan, Scots Pine, Whitebeam, Willow.
Page 157

Page 158

Page 158

Page 159

WARD 08_17 
21/01217/APP
10th August 2021
Substitution of house types at plots Nos 267 296 298 to
303 (as per application 18/01142/APP) and renumber
plots to 406-416 R2 Ferrylea Forres Moray 
for Springfield Properties PLC 
Comments: 
 The proposal has previously been reported to Committee and the appointed
officer considers that significant implications of this proposal in conjunction with
18/01142/APP have been made for Committee to reconsider the development.
 No objections received. 
Procedure: 
 If members are minded to approve as per the recommendation, then a
modification of the existing legal agreement attached to planning permission ref
18/01142/APP (as permitted under appeal decision notice PPA-300-2057) is
required prior to issue of planning consent. 
Recommendation Grant Planning Permission Subject to Conditions: 
Conditions/Reasons 
1. The development hereby granted planning permission forms part of, and is related
to, a development granted planning permission under formal planning appeal
decision notice PPA-300-2057 by the Planning and Environmental Appeals
Division, Scottish Government dated 2 July 2020 wherein:
a.   the terms and conditions as attached to the permission granted under that
decision notice are hereby re-iterated and remain in force in so far as they
relate to the development hereby approved, namely conditions 1, 4, 5, 17-20,
including any details already approved thereunder to discharge the
requirements of those conditions; and
b.   no part of the development as hereby granted shall be exercised in
conjunction with, or in addition to, the building design and plot layout details
already approved for plots 298 – 303 (now identified under this permission
as plots 406 – 414). 
Reason: To ensure a satisfactory form of development and that it progresses in
accordance with the already approved and required details, and that only one
permission is implemented on plots 298 – 303 (now identified as plots 406 – 414). 
Item 8
Page 159

Page 160

2. Prior to any development commencing and notwithstanding the details shown on
the approved plans, a scheme of external material finishes of the houses and flats
that match those of consented neighbouring plots shall be submitted to and
approved in writing by the Council, as Planning Authority. Thereafter the
development shall be implemented in accordance with the approved details. 
Reason: To ensure suitable material finishes to each plot, in the interests of the
character of the development in which the house plots sit. 
3. Notwithstanding the details shown for Plots 406-413 (which are not accepted) no
development shall commence until details (Location and Design plans) have been
submitted for approval by the Planning Authority in consultation with the Roads
Authority showing the provision of secure cycle parking facilities at a rate of not
less than 1 space per flat. Thereafter the cycle parking shall be provided prior to
completion of the associated flats and retained and maintained for that purpose
unless otherwise agree in writing by the Planning Authority in consultation with the
Roads Authority. 
Reason: In the interests of an acceptable form of development and the provision
of cycle parking infrastructure to support the use of low carbon transport, through
the provision of details currently lacking. 
4. Notwithstanding the details submitted. No development works shall commence
until a detailed drawing (scale 1:200) has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority confirming the provision of, or location where future Electric Vehicle (EV)
charging unit(s) can be connected to an appropriate electricity supply, including
details (written proposals and/ or plans) to confirm the provision of the necessary
cabling, ducting, and consumer units capable of supporting the future charging
unit and infrastructure; and thereafter the EV charging infrastructure shall be
provided in accordance with the approved drawing and details prior to the
completion of the dwelling house. 
Reason: In the interests of an acceptable form of development and the provision
of infrastructure to support the use of low carbon transport, through the provision
of details currently lacking. 
5. Parking provision for houses shall be provided at the following rates:
   1 Bedroom = 1 space
   2 -3 Bedrooms = 2 spaces
   4 or more bedrooms = 3 spaces 
Parking shall be provided prior to the completion of each house which it is
associated with and thereafter retained and available for that purpose unless
otherwise agreed in writing by the Planning Authority in consultation with the
Roads Authority. 
Reason: To ensure the permanent availability of the level of parking necessary for
residents/visitors/others in the interests of an acceptable development and road
safety.  
Page 160

Page 161

6. No boundary fences, hedges, walls or any other obstruction whatsoever over
0.6m in height and fronting onto the public road shall be within 2.4m of the edge of
the carriageway. 
Reason: To enable drivers of vehicles entering or exiting the site to have a clear
view so that they can undertake the manoeuvre safely and with the minimum
interference to the safety and free flow of traffic on the public road. 
7. The landscaping as shown in drawing number MO01-1_Remix_SL_13 Rev A
hereby approved shall be provided by no later than the first planting season after
completion or first occupation of the respective house plot/block of flats to which
the landscaping relates (whichever is the soonest). Any trees, shrubs and hedge
plantings which within a period of 5 years from planting die, are removed or
become seriously damaged or diseased shall be replaced in the following planting
season with others of similar size, number and spacing unless the Planning
Authority gives written consent to any variation of this condition. 
Reason: In order to ensure that the approved landscaping works are timeously
carried out and properly maintained in a manner which will not adversely affect the
amenity, appearance, character and quality of the development and the
surrounding area. 
8. That all natural habitat creation measures identified in the approved document
“Forres Bat and Bird Boxes” shall be provided on their respective house prior to its
occupation or completion (whichever is the soonest) and retained in perpetuity
unless otherwise agreed in writing with the Council, as Planning Authority. 
Reason: In order to ensure timeous delivery of biodiversity enhancement
measures. 
9. No development shall commence until a scheme for the provision of a communal
bin storage area for flatted properties in the development has been submitted to
and approved in writing by the Planning Authority. Thereafter, no flats shall be
brought into use unless they are served by the bin storage facilities as approved
under this condition for their respective block. 
Reason: In order to ensure the flatted properties are served by suitable recycling
and refuse facilities. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal complies with the Moray Local Development Plan 2020 and there are no
material considerations that indicate otherwise.   
Page 161

Page 162

List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
This decision notice must be read in conjunction with the terms of the planning
obligation that has been entered into in respect of this development under Section
75 of the Town and Country Planning (Scotland) Act 1997 (as amended). The
agreement is available for inspection on the Moray Council online planning
register. 
A Building Warrant will be required for the proposals.  Should you require further
assistance please do not hesitate to contact Building Standards, Environmental
Services Department, Council Office, High Street, ELGIN IV30 1BX or by
telephoning 0300 1234561. 
The TRANSPORTATION MANAGER has commented that:- 
Before commencing development, the applicant is obliged to apply for
Construction Consent in accordance with Section 21 of the Roads (Scotland) Act
1984 for new roads. The implications for the proposed changes on any existing
Roads Construction Consent must be addressed. The applicant will be required to
provide technical information, including drawings and drainage calculations, and
provide a Road Bond to cover the full value of the works in accordance with the
Security for Private Road Works (Scotland) 1985 Regulations. Advice on this
matter can be obtained from the Moray Council web site or by emailing
transport.develop@moray.gov.uk 
The details submitted indicate one of the frontage parking spaces for plots 414
and 415 is to be angled in front of the building. This arrangement increases the
frontage parking area shown on the plots. The proposed arrangement is not
recommended, notwithstanding this it is accepted for this plot substation. Details
of the proposed dropped kerb arrangements have not however been submitted for
approval and for the avoidance of doubt no more than 6 dropped kerbs will be
permitted for the driveways shown. 
The provision of Electric Vehicle (EV) chargers and/or associated infrastructure
shall be provided in accordance with Moray Council guidelines. Cabling between
charging units and parking spaces must not cross or obstruct the public road
including footways. Infrastructure provided to enable EV charging must be
retained for this purpose for the lifetime of the development unless otherwise
agreed in writing by the Planning Authority.   Guidance on Electric Vehicle (EV)
Charging requirements can be found at:
http://www.moray.gov.uk/downloads/file134860.pdf 
Public utility apparatus may be affected by this proposal.  Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
Page 162

Page 163

No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
1090BW STOCK 323  Cullen ground floor EV
1287DT STOCK324  Balerno ground floor EV
1653DT STOCK324  Kintore ground floor EV
MO01-1_REMIX_SL_15-1  EV charging locations - Plot 406
MO01-1_REMIX_LP_02  Location plan
652/757(Stock)901  Auldearn - elevations and floor plans
1287dt(stock)901  Balerno - elevations and floor plans
1090bw(stock)901  Cullen - elevations and floor plans
1653dt(stock)901  B Kintore - elevations and floor plans 
MO01-1_REMIX_SL_15-2  B EV charging locations - Plot 414
MO01-1_REMIX_SL_15-3  B EV charging locations - Plot 415
MO01-1_REMIX_SL_15-4  B EV charging location - Plot 416
MO01-1_REMIX_SL_15  B EV charging provision - Plots 406-416
MO01-1_REMIX_SL_13  A Landscaping layout
MO01-1_REMIX_SL_12  A Site layout
MO01-1_REMIX_01  E House type allocation
FO-(--)ENG-305 Levels layout
MO01-1_Remix_SL_04 Material conditions 
Approved Documents 
 Forres Bat and Bird Boxes
 Drainage Statement
Page 163

Page 164

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
R2 Ferrylea
Forres
Planning Application Ref Number: 
21/01217/APP
Location Plan
Applicant Name: 
Springfield Properties PLC
Page 164

Page 165

Site Location
Page 165

Page 166

16/01664/APP
Site
layout
Page 166

Page 167

Page 167

Page 168

16/
Page 168

Page 169

PLANNING APPLICATION: 21/01217/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1. THE PROPOSAL 
   Remix of 8 consented house plots to form 8 flats and 3 detached houses
within a consented housing development at Ferrylea, Forres (currently
marketed by the applicant as “Knockomie Braes”).
   The 8 flats would be arranged in 2 two storey blocks with a central area of
courtyard parking (16 spaces), with associated communal open space and
landscaping. 
   The 3 detached houses would be two storey and have a private driveway
and a single integral garage each.
   The flats along with one detached house would occupy a central area of a
street within the consented housing development on what is consented to
be four detached houses and two semi-detached houses.
   The other two houses would occupy two consented house plots and their
respective plot boundaries would remain unchanged. 
2. THE SITE 
   House plots within a consented housing development. The area of ground
subject to this application is amongst development currently under
construction. 
   The surrounding plots comprise a mix of detached and semi-detached
houses. 
3. HISTORY 
The designation in which the site sits has been subject to three phases of
development on residential designation R2 – Ferrylea, Forres in the Moray
Local Development Plan 2020 (previously R3 in Moray Local Development Plan
2015 and Moray Local Development Plan 2008). Phases 1 and 2 are complete
and phase 3 is underway and a number of houses are now occupied. 
Five applications on phase 3 pending consideration alongside this
application: 
21/00941/APP – Revised design of three detached houses on plots 257-259
permitted under 18/01142/APP. Willingness to approve under delegated
powers subject to varied legal agreement. 
Page 169

Page 170

21/01350/APP – Remix of 12 flats to 8 flats and two houses, and erection of 16
flats on site of consented student accommodation site (19/00615/APP) pending
consideration alongside this application. 
21/01717/APP – Remix of 12 flats and one detached house to eight flats, two
detached and two semi-detached houses pending consideration alongside this
application. 
21/01801/APP – Remix of 20 flats to 10 flats and two detached houses pending
consideration alongside this application. 
21/01821/APP – Revised design and layout of 16 flats pending consideration
alongside this application. 
Phase 3 
18/01142/APP – Planning permission for 316 residential units refused by the
Planning and Regulatory Services Committee at their meeting of 8 October
2019 and decision notice issued on 16 October 2019. Subsequent appeal to
the Planning and Environmental Appeals Division (Scottish Ministers) allowed
subject to signing of legal agreement to secure development obligations.
Decision issued following signing of legal agreement on 2 July 2020. 
19/01184/APP – Installation of SuDS basin adjacent approved by the Planning
and Regulatory Services Committee at their meeting of 25 February 2020 and
decision notice issued on 28 February 2020. 
19/00615/APP – Erection of student residences (6 flats with 42 bed spaces)
with associated parking and landscaping granted planning permission was
given a willingness to approve by the Planning and Regulatory Services
Committee at their meeting of 8 October 2019 subject to signing of legal
agreement to secure developer obligations. Legal agreement was subsequently
signed and decision issued on 14 July 2020. 
17/00970/PAN – Proposal of Application Notice (PAN) for residential
development and associated infrastructure incorporating the balance of Forres
R3 Ferrylea and Forres LONG 3. This PAN was presented to the Planning and
Regulatory Services Committee on 15 August 2017. Feedback was given by
the Committee on a number of matters that should be taken into account. 
Phase 2 
16/00743/APP – 120 residential units with associated infrastructure granted
planning permission on 28 April 2017 following decision of Planning and
Regulatory Services Committee meeting of 6 December 2016 to grant consent
subject to conditions and legal agreement. 
15/01861/PAN – PAN for residential development on part of R3 Ferrylea,
Forres. This PAN was reported to the Planning and Regulatory Services
Committee on 1 December 2015. Feedback was given by the Committee on
access arrangements. 
Page 170

Page 171

Phase 1 
12/01110/APP – Erection of 129 residential units and community facilities
(dental practice, retail units) with associated infrastructure and landscaping, as
well as masterplan covering the remaining balance of site R3 (up to 380 units)
granted planning consent by Planning and Regulatory Services Committee of
18 December 2012 subject to conditions and legal agreement. 
15/01923/APP – Application for a partial reconfiguration of the site granted
under 12/01110/APP increasing number of units on part of site from 5 to 10
units granted planning consent by Planning and Regulatory Services
Committee of 23 February 2016 subject to conditions. 
10/00048/PAN – Proposal of Application Notice for housing development and
community facilities. 
Phases 1 & 2 - Several applications to vary house types across the consented
phases have been approved. 
4. POLICY - SEE APPENDIX 
5. ADVERTISEMENTS 
5.1 None 
6. CONSULTATIONS 
Transportation Manager – No objections subject to conditions in relation to
car and cycle parking and EV charging. 
Strategic Planning and Delivery – Quality audit not required due to nature of
amendments proposed, following amendments and clarification, proposal
complies with relevant policies of the Moray Local Development Plan 2020. 
Environmental Health – No objections. 
Contaminated Land – No objections. 
Scottish Water – No objections, sufficient capacity for foul (Forres Waste
Water Treatment Works) and water (Glenlatterach Water Treatment Works)
connections. 
Moray Flood Risk Management – No objections. 
Developer Obligations – Revised developer obligations assessment for wider
development approved under 18/01142/APP in light of amendments proposed
under this and other remix applications. Obligations sought towards:
   Transport – public transport and Orchard Road/Thornhill Road junction
improvement;
Page 171

Page 172

   Healthcare – extension to Forres Health Centre, 2 additional dental chairs
and reconfiguration of pharmacy outlets; and
   Sports and Recreation – 3G pitch in Forres. 
Housing – Condition must be applied to ensure 25% affordable housing
provision and 10% accessible housing in private units is provided across the
site permitted under 18/01142/APP. 
7. OBJECTIONS-REPRESENTATIONS 
None received. 
8. OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. the adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. The main issues are considered below: 
8.2 Principle
The general principle of residential development on this site is established via
the extant consent in place in addition to its designation as a residential
development site in the MLDP. Consideration therefore lies with the suitability
of the proposal in terms of design, siting and servicing arrangements (parking,
drainage, etc.). 
8.3 Design and Siting
Policy PP1 requires new development of 10 or more units to be subject to the
quality audit process, however given this proposal involves the revision of a
small part of a consented development, and there is no change to the street
layout, open space, landscaping, play area, SuDS, etc. in the wider
development, there is limited scope to apply the quality audit process to this
application. Nonetheless the requirements of policies PP1 and DP1 must still
be considered. 
8.3.1 The layout of the wider development in which this proposal sits will remain
largely unchanged, with the main difference being the inclusion of flats within
the street. The flats are located in what was originally a street of detached
houses. The consented layout offered a strong building line on the street in
which the houses would be located. The proposed layout reflects this, with the
flats respecting this building line, breaks up the line of houses whilst also
offering some variety to the street scene (which was previously only detached
houses). The house on plot 415 (originally 296) proposes a side window,
enabling this corner plot to have a window to the side to a principal room. 
8.3.2 The houses and flats themselves are all “house types” that have been used
elsewhere on the wider site permitted under 18/01142/APP. These are
therefore in keeping with the common identity established by the applicant’s
housebuilding style on this site and elsewhere in the region. Under
18/01142/APP the site was split into different character areas, whereby the use
Page 172

Page 173

of varying external material finishes to the buildings, landscaping and surfacing
materials allowed the development to have a mix in finishes to offer a degree of
variety and legibility to the housing development. This proposal has proposed a
slight difference to the material finishes, but a condition will be applied to
ensure material finishes match those of the established character areas under
the original consent. 
8.3.3 The position of the houses and flats subject to this application do not give rise
to any amenity issues in terms of significant adverse overlooking,
overshadowing and loss of light to neighbouring house plots. 
8.3.4 The proposed car parking arrangement for the flats (courtyard to the side), has
allowed for the 50% requirement of parking to the side and rear of the building
line under policy PP1. This reduces the dominance of parked cars on the street
scene compared with extant consent. This parking is broken up at an interval of
every 4 spaces with shrub planting. 
8.3.5 Sufficient landscaping has been proposed, with hedge boundary treatment on
front gardens where they have a road frontage, along with trees to the front of
the flats. The species are suitable for the character areas established under
18/01142/APP. 
8.3.6 Overall, the design and siting of the proposal is considered to comply with
policies PP1 and DP1. 
8.4 Biodiversity
Under policy EP2, new development proposal of four or more houses must
ensure they safeguard and enhance biodiversity. In this case a biodiversity
statement provided with the application has identified that landscaping along
with bat and bird boxes will be provided in order to enhance biodiversity. Given
the scale and type of development (remixing a consented scheme), the
proposed biodiversity measures are considered to be acceptable in terms of
policy EP2. 
8.5 Parking and Access
The proposed parking arrangement is considered suitable, with the
Transportation Manager raising no objections to this proposal, subject to
conditions ensuring electric vehicle charging infrastructure can be
accommodated within the development, cycle parking is provided for flats and
ensuring parking provision is maintained at the numbers proposed. Subject to
these conditions, the proposal is considered to comply with the requirements of
policies PP3 and DP1 in respect of parking and access. 
8.6 Drainage and Water
Existing drainage arrangements consented under application 18/01142/APP
will be amended to accommodate the revised proposal subject to this
application. Moray Flood Risk Management have raised no objections to the
proposal in regards to design. 
8.7 Developer Obligations
In light of the revisions to this application along with other amendments
proposed (see History), an updated developer obligations assessment has
Page 173

Page 174

been undertaken for the site. The developer has agreed to the heads of terms
of these obligations and following determination of this consent (and the
others), the legal agreement will be varied to take account of these
amendments. Subject to this being undertaken the proposal complies with
policy PP3. 
8.8 Affordable and Accessible Housing
The revisions proposed have impacted on the provision of affordable housing.
The extant consent provides 25% affordable housing, and policy DP2 requires
25% to be provided on any housing development of four or more units. In light
of the amendments proposed there is a net increase in 3 units as a result of this
proposal. The Housing Manager has not objected to this application but has
recommended the proposal be subject to a condition ensuring affordable
housing is provided at a rate of 25% across phase 3 (covered under application
18/01142/APP and the student accommodation site (19/00615/APP)). 
8.8.1 Plans provided with this and all other applications pending consideration show
25% affordable housing will be provided. The application with affordable
housing shown (21/01350/APP) will be conditioned to ensure its provision and
secure 25% on site provision of affordable housing, though as no affordable
housing is shown as part of this remix application a condition is not necessary
for this consent. 
8.8.2 Accessible housing figures will see an increase of four ground floor flats
provided as part of the wider development of phase 3, however this number will
have to be considered as part of the other remixes proposed. Nonetheless, the
overall provision of accessible housing exceeds 10% under the original phase 3
consent 18/01142/APP (22.7%). 
8.8.3 Taking account of the above considerations there is no conflict with policy DP2. 
Conclusion and Recommendation
The proposed remix comprises a suitable form of development in terms of
siting, design, layout, and can be served by suitable infrastructure (either
existing or proposed as part of this proposal or the original consent for the
housing development). It therefore complies with relevant policies of the MLDP
2020. Approval is therefore recommended subject to conditions, but consent
should be held until the developer has entered into a varied legal agreement of
that in place under planning permission 18/01142/APP to secure developer
obligations. 
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal complies with the Moray Local Development Plan 2020 and there
are no material considerations that indicate otherwise. 
Author/Contact
Officer:
Andrew Miller            
Senior Planning Officer
Ext: 01343 563274 
Beverly Smith
Development Management & Building Standards Manager
Page 174

Page 175

APPENDIX 
POLICY 
Moray Local Development Plan 2020 
PP1 PLACEMAKING 
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(i) Character and Identity
• Create places that are distinctive to prevent homogenous 'anywhere'
development;
• Provide a number of character areas reflecting site characteristics that
have their own distinctive identity and are clearly distinguishable;
• Provide distinctiveness between and in each character area through a
combination of measures including variation in urban form, street
structure/network, architecture and masonry, accent features (such as
porches), surrounds and detailing, materials (buildings and surfaces),
colour, boundary treatments, hard/soft landscaping and a variety of
approaches to tree species and planting that emphasises the hierarchy of
open spaces and streets within a cohesive design strategy for the whole
development;
• Distinctiveness must be reinforced along main thoroughfares, open
spaces and places where people may congregate such as
shopping/service centres;
• Retain, incorporate and/or respond to relevant elements of the landscape
such as topography and planted features, natural and historic
environment, and propose street naming (in residential developments of
20 units and above, where proposed names are to be submitted with the
planning application) to retain and enhance local associations; 
Page 175

Page 176

(ii) Healthier, Safer Environments
• Designed to prevent crime, fear of crime and anti-social behaviour with
good levels of natural surveillance and security using treatments such as
low boundary walls, dual frontages (principal rooms) and well-lit routes to
encourage social interaction.  Unbroken high boundary treatments such
as wooden fencing and blank gables onto routes, open spaces and
communal areas will not be acceptable.
• Designed to encourage physical exercise for people of all abilities.
• Create a distinctive urban form with landmarks, key buildings, vistas,
gateways and public art to provide good orientation and navigation
through the development.
• Provide a mix of compatible uses, where indicated within settlement
statements, integrated into the fabric of buildings within the street.
• Prioritise pedestrians and cyclists by providing a permeable movement
framework that incorporates desire lines (including connecting to and
upgrading existing desire lines) and is fully integrated with the surrounding
network to create walkable neighbourhoods and encourage physical
activity.
• Integrate multi- functional active travel routes, green and open space into
layout and design, to create well connected places that encourage
physical activity, provide attractive spaces for people to interact and to
connect with nature.
• Create safe streets that influence driver behaviour to reduce vehicle
speeds that are appropriate to the local context such as through shorter
streets, reduced visibility and varying the building line.
• Provide seating opportunities within streets, paths and open spaces for all
generations and mobility's to interact, participate in activity, and rest and
reflect.
• Provide for people with mobility problems or a disability to access
buildings, places and open spaces.
• Create development with public fronts and private backs. 
• Maximise environmental benefits through the orientation of buildings,
streets and open space to maximise the health benefits associated with
solar gain and wind shelter. 
(iii) Housing Mix
• Provide a wide range of well integrated tenures, including a range of
house types and plot sizes for different household sizes, incomes and
generations and meet the affordable and accessible requirements of
policy DP2 Housing.
• All tenures of housing should have equal access to amenities, greenspace
and active travel routes. 
(iv) Open Spaces/Landscaping
• Provide accessible, multi-functional open space within a clearly defined
hierarchy integrated into the development and connected via an active
travel network of  green/blue corridors that are fully incorporated into the
development and to the surrounding area, and meet the requirements of
policy EP5 Open Space and the Open Space Strategy Supplementary
Guidance and Policy EP12 Managing the Water Environment and
Drainage Impact Assessment for New Developments Supplementary
Guidance.
Page 176

Page 177

• Landscaped areas must provide seasonal variation, (mix of planting and
colour) including native planting for pollination and food production.
• Landscaping areas that because of their size, shape or location would not
form any useable space or that will not positively contribute to the
character of an area will not contribute to the open space requirements of
Policy EP4 Open Space.
• Semi-mature tree planting and shrubs must be provided along all routes
with the variety of approaches reflecting and accentuating the street
hierarchy.
• Public and private space must be clearly defined.
• Play areas (where identified) must be inclusive, providing equipment so
the facility is for every child/young person regardless of ability and
provided upon completion of 50% of the character area.
• Proposals must provide advance landscaping identified in site
designations and meet the quality requirements of policy EP5 Open
Space.
• Structural landscaping must incorporate countryside style paths (such as
bound or compacted gravel) with waymarkers.
•  Maintenance arrangements for all paths, trees, hedging, shrubs, play/
sports areas, roundabouts and other open/ green spaces and blue/green
corridors must be provided. 
v) Biodiversity
• Create a variety of high quality multi- functional green/blue spaces and
networks that connect people and nature, that include trees, hedges and
planting to enhance biodiversity and support habitats/wildlife and comply
with policy EP2 Biodiversity and Geodiversity and EP5 Open Space.
• A plan detailing how different elements of the development will contribute
to supporting biodiversity must be included in the design statement
submitted with the planning application.
• Integrate green and blue infrastructure such as swales, permeable paving,
SUDS ponds, green roofs and walls and grass/wildflower verges into
streets, parking areas and plots to sustainably address drainage and
flooding issues and enhance biodiversity from the outset of the
development.
• Developments must safeguard and where physically possible extend or
enhance wildlife corridors and green/blue networks and prevent
fragmentation of existing habitats. 
(vi) Parking
• Car parking must not dominate the streetscape to the front or rear of
properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum
of 50% car parking within the front curtilage or on street, subject to the
visual impact being mitigated by hedging, low stone boundary walls or
other acceptable treatments that enhance the streetscape.
• Provide semi-mature trees and planting within communal private and
public/visitor parking areas and on-street parking at a maximum interval of
4 car parking spaces.
• Secure and covered cycle parking and storage, car sharing spaces and
electric car charging points must be provided in accordance with policy
DP1 Development Principles.
Page 177

Page 178

• Parking areas must use a variation in materials to reduce the visual
impact on the streetscene. 
(vii) Street Layout and Detail
• Provide a clear hierarchy of streets reinforced through street width,
building density and street and building design, materials, hard/soft
landscaping and a variety of approaches to tree planting and shrubs.
• Streets and connecting routes should encourage walking and cycling over
use of the private car by providing well connected, safe and appealing
routes.
• Design junctions to prioritise pedestrians, accommodate active travel and
public transport and service/emergency vehicles to reflect the context and
urban form and ensure that the street pattern is not standardised.  
• Dead-end streets/cul-de-sacs will only be selectively permitted such as on
rural edges or where topography, site size, shape or relationship to
adjacent developments prevent an alternative more permeable layout.
These must be short, serving no more than 10 units and provide walking
and cycling through routes to maximise connectivity to the surrounding
area.
• Where a roundabout forms a gateway into, or a landmark within, a town
and/or a development, it must be designed to create a gateway feature or
to contribute positively to the character of the area.
• Design principles for street layouts must be informed by a Street
Engineering Review (SER) and align with Roads Construction Consent
(RCC) to provide certainty that the development will be delivered as per
the planning consent. 
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan. 
(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space. 
Page 178

Page 179

ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS. 
ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use. 
Page 179

Page 180

b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours 
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations 
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment. 
Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
Page 180

Page 181

the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
Page 181

Page 182

f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. 
Alterations and extensions must be compatible with the character of the
existing building in terms of design, form, choice of materials and positioning
and meet all other relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
Page 182

Page 183

e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2. 
f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
Page 183

Page 184

g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry. 
h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
DP2 HOUSING
a) Proposals for development on all designated and windfall housing sites must include
a design statement and shall include supporting information regarding the
comprehensive layout and development of the whole site, addressing infrastructure,
access for pedestrians, cyclists, public transport and service vehicles, landscaping,
drainage, affordable and accessible housing and other matters as may be required
by the planning authority, unless these requirements are not specified in the site
designation or are considered not to be required. 
Proposals must comply with Policy PP1, DP1, the site development requirements
within the settlement plans, all other relevant policies within the Plan and must
comply with the following requirements; 
b) Piecemeal/ individual plot development proposals 
Piecemeal and individual/ plot development proposals will only be acceptable where
details for the comprehensive redevelopment of the site are provided to the
satisfaction of the planning authority and proposals comply with the terms of Policy
DP1, other relevant policies including access, affordable and accessible housing,
landscaping and open space and where appropriate key design principles and site
designation requirements are met. 
Proposals for piecemeal/ plot development must be accompanied by a Delivery Plan
setting out how the comprehensive development of the site will be achieved.              
c) Housing density 
Capacity figures indicated within site designations are indicative only. Proposed
capacities will be considered through the Quality Auditing process against the
characteristics of the site, character of the surrounding area, conformity with all
policies and the requirements of good Placemaking as set out in Policies PP1 and
DP1. 
d) Affordable Housing 
Proposals for all housing developments (including conversions) must provide a
contribution towards the provision of affordable housing. 
Proposals for new housing developments of 4 or more units (including conversions)
must provide 25% of the total units as affordable housing in  affordable tenures to be
agreed by the Housing Strategy and Development Manager. For proposals of less
than 4 market housing units a commuted payment will be required towards meeting
housing needs in the local housing market area. 
A higher percentage contribution will be considered subject to funding availability, as
informed by the Local Housing Strategy. A lesser contribution or alternative in the
form of off-site provision or a commuted payment will only be considered where
exceptional site development costs or other project viability issues are demonstrated
and agreed by the Housing Strategy and Development Manager and the Strategic
Planning and Development Manager. Intermediate tenures will be considered in
Page 184

Page 185

accordance with the HNDA and Local Housing Strategy, and agreed with the
Housing Strategy and Development Manager. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 40. 
e) Housing Mix and Tenure Integration   
Proposals must demonstrate tenure integration and meet the following criteria; 
• Architectural style and external finishes must ensure that homes are tenure
blind 
• The spatial mix must ensure communities are integrated to share school
catchment areas, open spaces, play areas, sports areas, bus stops and other
community facilities. 
f) Accessible Housing 
Housing proposals of 10 or more units incorporating affordable housing will be
required to provide 10% of the private sector units to wheelchair accessible standard.
Flexibility may be applied on sites where topography would be particularly
challenging for wheelchair users. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 41. 
POLICY GUIDANCE NOTE- AFFORDABLE AND ACCESSIBLE HOUSING
Affordable Housing
Providing affordable housing is a key priority for Moray Council and this is reflected in the
Local Outcomes Improvement Plan (LOIP) and the Local Housing Strategy (LHS). The
Council's Housing Need and Demand Assessment 2017 highlights the significant
requirement for affordable housing in Moray, which is a national issue, resulting from  a
number of factors including affordability issues, downturn in the economy and the
shortage of public and private sector rented houses. 
Planning policies assist with the provision of affordable housing, which is defined in
Scottish Planning Policy (SPP) as; 
"housing of a reasonable quality that is affordable to people on modest incomes.
Affordable housing may be provided in the form of social rented accommodation, mid-
market rented accommodation, shared ownership housing, shared equity housing,
housing sold at a discount (including plots for self -build and low cost housing without
subsidy." This local development plan regards lower quartile earnings as "modest
incomes". 
The 2017 HNDA identified a requirement for 56% of all need and demand to be affordable
units in Moray between 2017 and 2035. This Local Development Plan has lowered the
threshold so that individual house proposals are required to make a contribution towards
affordable housing provision, which is intended to ensure proposals do not circumnavigate
the policy and provide a fair and transparent process. 
Page 185

Page 186

A number of variables influence affordability of housing, including mortgage deposit
requirements, mortgage interest rates, lower quartile house prices, lower quartile private
rents, lower quartile full time gross earnings. Changes in these variables will affect the
affordability of housing in Moray. The maximum affordable rent and maximum affordable
house purchase prices is published on the Council's website at
http://www.moray.gov.uk/moray_standard/page_90100.html. The current Local Housing
Allowance will be used as a proxy for average private sector rents.
Affordable housing should be provided on site and as part of a mixed development of
private and affordable units. To meet the need for affordable housing there may be
proposals for 100% provision of affordable housing and these will be acceptable as part of
a wider mixed community, provided all other  Local Development Plan policies are met. 
The policy requires single house proposals to make a commuted sum payment as a
developer obligation towards affordable housing, with the cost figure published annually
on the Council website at http://www.moray.gov.uk/moray_standard/page_94665.html and
determined by the District Valuer's assessment of the value of serviced land for affordable
housing in Moray. This allows developers to be clear at the outset of a project about the
potential cost of commuted payments and should be reflected in land values. 
The type of affordable housing to be provided will be determined by the Housing and
Property service. Developers should contact Housing and Property as early as possible.
Housing and Property will decide whether a commuted payment or affordable units will be
required on a site by site basis.   Housing and Property will provide developers with an
affordable housing mix, detailing the size and type of housing required based on
HNDA/LHS requirements. 
The Council will consider the following categories of affordable housing within the context
of the needs identified in the HNDA/ LHS;
• Social rented accommodation- housing provided by an affordable rent managed by a
Registered Social Landlord such as a housing association or another body regulated
by the Scottish Housing Regulator, including Moray Council.
• Mid-market rent accommodation- housing with rents set at a level higher than purely
social rent, but lower than market rent levels and affordable by households in
housing need. Mid-market rent housing can be provided by the private and social
housing sectors.
• Shared equity housing- sales to low income households, administered through a
Scottish Government scheme e.g. Low-cost initiative for First Time Buyers (LIFT). 
Any proposals to provide affordable housing in a form other than those listed above, must
demonstrate that the cost to the householder is "affordable" in the Moray context and that
the property will remain "affordable" in perpetuity. 
Affordable housing requirement figures will be rounded up. 
The Strategic Housing Investment Plan (SHIP) is produced annually by the Council and
identifies details of the proposed delivery of affordable housing. 
Accessible housing
Scottish Planning Policy states (para 28) that "the aim is to achieve the right development
in the right place; it is not to allow development at any cost" and "that policies and
decisions should be……supporting delivery of accessible housing."
Policy DP2 aims to;
Page 186

Page 187

• Assist the Council, the NHS and the Health and Social Care Moray to meet the
challenges presented by our ageing population and the shared aim of helping people
to live well at home or in a homely setting. The HNDA 2017 demonstrates that
Moray's population is ageing and there is a trend towards older and smaller
households. 
• Provide increased choice of tenure to people with physical disabilities or mobility
impairments, by increasing the supply of accessible housing in the private sector.
There is currently a mismatch between the size and type of housing required and the
size and type of housing available across all tenures. This mismatch, along with
increasing housing needs associated with physical disability, are the likely drivers of
owner occupiers seeking public sector accessible housing to meet medical needs. 
Accessible/ adapted housing can promote independence and wellbeing for older or
disabled people, can facilitate self- care, informal care and unpaid care, potentially prevent
falls and hospital admissions and can delay entry into residential care. 
Policy DP2 requires that housing proposals of 10 or more units incorporating affordable
housingmust provide 10% of the private sector units to wheelchair accessible standard
where all the rooms are accessible to a wheelchair user. 
This applies to new build and conversion/ redevelopment projects. Flexibility may apply
where there is extremely challenging topography or where the site is in a remote location.
For the purposes of Policy DP2, "remote" locations are defined as being rural areas
outside settlement and Rural Grouping boundaries as defined in the Local Development
Plan. 
Accessible units should be in a location which provides convenient access, in terms of
distance, gradient and available public transport, to reach the facilities needed for
independent living. Small, low maintenance gardens are generally regarded as a positive
feature by this customer group. 
New wheelchair accessible housing in any tenure must comply with Housing for Varying
Needs Standards (HfVNs), including the standards specific to dwellings for wheelchair
users. HfVNs is available at
http://webarchive.nationalarchives.gov.uk/20131205115152uo_/http://www.archive2.officia
l-documents.co.uk/document/deps/cs/HousingOutput/start.htm 
The specific design specification required to meet the terms of this policy are; 
External requirements
• location(s) convenient for amenities and facilities e.g. public transport, local shops
etc
• car parking space as close as possible to the entrance door and at a maximum
distance of 15m (HfVNs para 7.13.4 refers).
• Step free paths within curtilage, ramp gradients preferably of 1:20 but no steeper
than 1:12 (HfVNs para 7.7.1 refers) 
Internal requirements
• Hallways- minimum 1200mm wide (HfVNs para 10.2.3 refers)
Page 187

Page 188

• Door frames- minimum 926mm wide door leaf, giving a clear width of 870mm (HfVNs
para 10.5.7 refers)
• Bathrooms/ wet rooms- 1500mm wheelchair turning circle required (HfVNs para
14.9.2 refers) 
Accessible housing requirement figures will be rounded down. 
All proposals for new build or converted housing should set out details of how they will
comply with this policy in their planning application. 
EP2 BIODIVERSITY
All development proposals must, where possible, retain, protect and enhance features of
biological interest and provide for their appropriate management.  Development must
safeguard and where physically possible extend or enhance wildlife corridors and
green/blue networks and prevent fragmentation of existing habitats. 
Development should integrate measures to enhance biodiversity as part of multi-functional
spaces/ routes. 
Proposals for 4 or more housing units or 1000 m2 or more of commercial floorspace must
create new or, where appropriate, enhance natural habitats of ecological and amenity
value. 
Developers must demonstrate, through a Placemaking Statement where required by
Policy PP1 which incorporates a Biodiversity Plan, that they have included biodiversity
features in the design of the development. Habitat creation can be achieved by providing
links into existing green and blue networks, wildlife friendly features such as wildflower
verges and meadows, bird and bat boxes, amphibian friendly kerbing, wildlife crossing
points such as hedgehog highways and planting to encourage pollination, wildlife friendly
climbing plants, use of hedges rather than fences, incorporating biodiversity measures into
SUDS and retaining some standing or lying dead wood, allotments, orchards and
woodlands. 
Where development would result in loss of natural habitats of ecological amenity value,
compensatory habitat creation will be required where deemed appropriate. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application.
Page 188

Page 189

Level 1 -  a flood statement with basic information with regard to flood risk.
Level 2 -  full flood risk assessment providing details of flood risk from all sources,
results of hydrological and hydraulic studies and any appropriate
proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood
risk will be required and any loss of flood storage capacity mitigated to achieve
Page 189

Page 190

a neutral or better outcome. Water resistant materials and construction must be
used where appropriate. Land raising and elevated buildings on structures such
as stilts are unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
Page 190

Page 191

presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side) 
(top of bank) 
Less than 1m 6m 
1-5m 6-12m 
5-15m 12-20m 
15m+                      20m+ 
The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP13 FOUL DRAINAGE 
All development within or close to settlements (as defined in the Local Development Plan)
of more than 2,000 population must connect to the public sewerage system unless
connection  is not permitted due to lack of capacity. In such circumstances, temporary
provision of private sewerage systems may be allowed provided Scottish Water has
confirmed investment to address this constraint has been allocated within its investment
Programme and the following requirements have been met; 
• Systems must not have an adverse effect on the water environment
• Systems must be designed and built to a standard which will allow adoption by
Scottish Water
• Systems must be designed such that they can be easily connected to a public sewer
in the future. Typically this will mean providing a drainage line up to a likely point of
connection. 
All development within or close to settlements (as above) of less than 2,000 population will
require to connect to public sewerage except where a compelling case is made otherwise.
Factors to be considered in such a case will include size of the proposed development,
whether the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Page 191

Page 192

Where a compelling case is made, a private system may be acceptable provided it does
not pose or add a risk of detrimental effects, including cumulative, to the natural and built
environment, surrounding uses or amenity of the general area. 
Where a private system is deemed to be acceptable, within settlements as above or small
scale development in the countryside, a discharge to land, either full soakaway or raised
mound soakaway, compatible with Technical Handbooks (which sets out guidance on how
proposals may meet the Building  Regulations) must be explored prior to considering a
discharge to surface waters. 
EP14 POLLUTION, CONTAMINATION & HAZARDS
a)  Pollution
Development proposals which may cause significant air, water, soil, light or noise
pollution or exacerbate existing issues must be accompanied by a detailed
assessment report on the levels, character and transmission of the potential pollution
with measures to mitigate impacts. Where significant or unacceptable impacts
cannot be mitigated, proposals will be refused.   
b) Contamination
Development proposals on potentially contaminated land will be approved where
they comply with other relevant policies and; 
i) The applicant can demonstrate through site investigations and risk assessment,
that the site is in a condition suitable for the proposed development and is not
causing significant pollution of the environment; and
ii) Where necessary, effective remediation measures are agreed to ensure the
site is made suitable for the new use and to ensure appropriate disposal and/ or
treatment of any hazardous material. 
c) Hazardous sites
Development proposals must avoid and not impact upon hazardous sites or result in
public safety concerns due to proximity or use in the vicinity of hazardous sites. 
R2  Ferrylea  22.2ha  380 units 
• Phases 1 and 2 of development has commenced with 249 units consented.
• A masterplan is required, incorporating land at West Park Croft, showing connections
between all areas, proposed landscaping, the required affordable and accessible
housing and required buffer to the gas pipeline.
• Lowering of density onto the rural edge required.
• Pocket park within south eastern part of site required.
• Transport Assessment required.
• Junction improvements required within Forres, scale to be determined through the
Transport Assessment.
• Widening of Mannachie Road along frontage of site to 6m and provision of a 3m
wide cycle path to the west side connecting to the north and completing any missing
sections between the site and the existing network to the north required.
• Contribution required towards path widening along Mannachie Road to 3m wide from
development to core path FR22 (including provision for a crossing).
Page 192

Page 193

• Widening of Mannachie Road to 5.5m from Link Road access, south to access to
West Park Croft and safeguarding for future widening within site boundary beyond
this is required. 
• Assessment for additional bus stop infrastructure within the frontage of the
development must be considered as part of the overall R2/R4/R6 bus stop
infrastructure provision and accessibility to bus stops. 
• A developer contribution towards public transport will be sought.
• Path links must be provided to the woodland to the south of the site, and north into
adjacent housing at Mannachie Brae.
• Flood Risk Assessment (FRA) required.
• Drainage Impact Assessment (DIA) required.
• Phase 1 Habitat Survey required.
• Archaeological targeted evaluation (10%) of known features and monitored topsoil
strip of all remaining areas required. 
Page 193

Page 194

Page 194

Page 195

WARD 08_17 
21/01350/APP
2nd September 2021
Substitution of plots and residential development on site
at R2 Ferrylea Forres Moray 
for Springfield Properties PLC 
Comments: 
 The proposal has previously been reported to Committee and the appointed
officer considers that significant implications of this proposal in conjunction with
18/01142/APP have been made for Committee to reconsider the development.
 The application has been advertised as a departure from the development plan.
 No objections received. 
Procedure: 
 If members are minded to approve as per the recommendation, then a
modification of the existing legal agreement attached to planning permission ref
18/01142/APP (as permitted under appeal decision notice PPA-300-2057) is
required prior to issue of planning consent.
 Request delegated authority to the Head of Economic Growth and Development
to withhold issue of consent until expiry of advert expiry period (28 June) to review
any late representations received. 
Recommendation 
Grant planning permission subject to conditions: 
Conditions/Reasons 
1. The development hereby granted planning permission forms part of, and is related
to, a development granted planning permission under formal planning appeal
decision notice PPA-300-2057 by the Planning and Environmental Appeals
Division, Scottish Government dated 2 July 2020 wherein:
a.     the terms and conditions as attached to the permission granted under that
decision notice are hereby re-iterated and remain in force in so far as they
relate to the development hereby approved, namely conditions 4, 5, 17-20,
including any details already approved thereunder to discharge the
requirements of those conditions; and
b.     no part of the development as hereby granted shall be exercised in
conjunction with, or in addition to, the building design and plot layout details
already approved for plots 167, 171 – 174, 196 – 203 (now identified under
this permission as plots 417 – 426). 
Item 9
Page 195

Page 196

Reason: To ensure a satisfactory for of development and that it progresses in
accordance with the already approved and required details, and that only one
permission is implemented on plots 167, 171 – 174, 196 – 203 (now identified as
plots 417 – 426). 
2. Prior to any development commencing and notwithstanding the details shown on
the approved plans, a scheme of external material finishes of the houses and flats
that match those of consented neighbouring plots shall be submitted to and
approved in writing by the Council, as Planning Authority. Thereafter the
development shall be implemented in accordance with the approved details. 
Reason: To ensure suitable material finishes to each plot, in the interests of the
character of the development in which the house plots sit. 
3. Prior to the commencement of development details of the affordable housing
specification for plots 425 - 442 shall be submitted to and approved in writing by
the planning authority regarding the detailed arrangements for the long-term
delivery and provision of the affordable housing accommodation on the site, which
shall include evidence to confirm the identity of the organisation (or other similar
agency) responsible for the provision and management of all affordable housing
provided on the site. Thereafter the development shall be implemented in
accordance with the approved details. 
Reason: to ensure 25% of the residential units approved across the wider site in
which this development sits are affordable and managed accordingly. 
4. Notwithstanding the details shown for cycle parking (the proposed bike locker
detail does not match the cycle parking shown on plans) no development shall
commence until details (Location and Design) have been submitted for approval
by the Planning Authority in consultation with the Roads Authority showing the
provision of secure covered cycle parking facilities at a rate of not less than 1
space per flat. Thereafter the cycle parking shall be provided prior to completion of
the associated flats and retained and maintained for that purpose unless
otherwise agree in writing by the Planning Authority in consultation with the Roads
Authority. 
Reason: In the interests of an acceptable form of development and the provision
of cycle parking infrastructure to support the use of low carbon transport, through
the provision of details currently lacking. 
5. Notwithstanding the details submitted. No development works shall commence
until a detailed drawing (scale 1:200) has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority confirming the provision of, or location where future Electric Vehicle (EV)
charging unit(s) can be connected to an appropriate electricity supply, including
details (written proposals and/ or plans) to confirm the provision of the necessary
cabling, ducting, and consumer units capable of supporting the future charging
unit and infrastructure; and thereafter the EV charging infrastructure shall be
provided in accordance with the approved drawing and details prior to the
completion of the dwelling house. 
Page 196

Page 197

Reason: In the interests of an acceptable form of development and the provision
of infrastructure to support the use of low carbon transport, through the provision
of details currently lacking. 
6. Parking provision for houses shall be provided at the following rates:
  1 Bedroom = 1 space
  2 -3 Bedrooms = 2 spaces
  4 or more bedrooms = 3 spaces 
Parking shall be provided prior to the completion of each house which it is
associated with and thereafter retained and available for that purpose unless
otherwise agreed in writing by the Planning Authority in consultation with the
Roads Authority. 
Reason: To ensure the permanent availability of the level of parking necessary for
residents/visitors/others in the interests of an acceptable development and road
safety.   
7. No boundary fences, hedges, walls or any other obstruction whatsoever over
0.6m in height and fronting onto the public road shall be within 2.4m of the edge of
the carriageway. 
Reason: To enable drivers of vehicles entering or exiting the site to have a clear
view so that they can undertake the manoeuvre safely and with the minimum
interference to the safety and free flow of traffic on the public road. 
8. The landscaping as shown in drawing numbers MO01-1_Remix_SL_23-1 Rev A,
MO01-1_Remix_SL_23-2 Rev A and MO01-1_Remix_SL_23 Rev C hereby
approved shall be provided by no later than the first planting season after
completion or first occupation (whichever is the soonest) of the respective house
plot/block of flats to which the landscaping relates. Any trees, shrubs and hedge
plantings which within a period of 5 years from planting die, are removed or
become seriously damaged or diseased shall be replaced in the following planting
season with others of similar size, number and spacing unless the planning
authority gives written consent to any variation of this condition. 
Reason: In order to ensure that the approved landscaping works are timeously
carried out and properly maintained in a manner which will not adversely affect the
amenity, appearance, character and quality of the development and the
surrounding area. 
9. No development shall commence unless a plan showing the location of all natural
habitat creations, as indicated in the submitted document “Forres Bird and Bat
Boxes” has been submitted and approved in writing by the Council, as Planning
Authority. This plan shall also include timing for provision of the respective
measures. Thereafter the natural habitat creations shall be provided and retained
in accordance with the approved details unless otherwise agreed in writing with
the Council, as Planning Authority. 
Page 197

Page 198

Reason: In order to agree the position of the biodiversity measures and ensure
they are provided timeously. 
10. No development shall commence until a scheme for the provision of a communal
bin storage area for flatted properties in the development has been submitted to
and approved in writing by the planning authority. Thereafter, no flats shall be
brought into use unless they are served by the bin storage facilities as approved
under this condition for their respective block. 
Reason: In order to ensure the flatted properties are served by suitable recycling
and refuse facilities. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal is considered to be an acceptable departure from policies DP1 and PP1
of the Moray Local Development Plan 2020 because parking for plots 425 and 426 do
not have 50% of their parking to the side or rear of the plot, however this is in keeping
with the established character of the consented development in which they sit. The
proposal complies with the Moray Local Development Plan 2020 in all other respects
and there are no material considerations that indicate otherwise. 
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
This decision notice must be read in conjunction with the terms of the planning
obligation that has been entered into in respect of this development under Section
75 of the Town and Country Planning (Scotland) Act 1997 (as amended). The
agreement is available for inspection on the Moray Council online planning
register. 
A Building Warrant will be required for the proposals.  Should you require further
assistance please do not hesitate to contact Building Standards, Environmental
Services Department, Council Office, High Street, ELGIN IV30 1BX or by
telephoning 0300 1234561. 
The TRANSPORTATION MANAGER has commented that:- 
Before commencing development, the applicant is obliged to apply for
Construction Consent in accordance with Section 21 of the Roads (Scotland) Act
1984 for new roads. The implications for the proposed changes on any existing
Roads Construction Consent must be addressed. The applicant will be required to
provide technical information, including drawings and drainage calculations, and
provide a Road Bond to cover the full value of the works in accordance with the
Security for Private Road Works (Scotland) 1985 Regulations. Advice on this
Page 198

Page 199

matter can be obtained from the Moray Council web site or by emailing
transport.develop@moray.gov.uk 
The provision of Electric Vehicle (EV) chargers and/or associated infrastructure
shall be provided in accordance with Moray Council guidelines. Cabling between
charging units and parking spaces must not cross or obstruct the public road
including footways. Infrastructure provided to enable EV charging must be
retained for this purpose for the lifetime of the development unless otherwise
agreed in writing by the Planning Authority.   Guidance on Electric Vehicle (EV)
Charging requirements can be found at:
http://www.moray.gov.uk/downloads/file134860.pdf 
Public utility apparatus may be affected by this proposal.  Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
2019 AS_901  Type AA - elevations and floor plans  
Horizontal 2 bike locker
652/757(STOCK)901  Auldearn - elevations and floor plans
BINSTORE_01 A Bin store details
MC/2018/D652/757(STOCK)901F/01  Type F semi- elevations and floor plans
MO01-1_REMIX_SL_26  Sections 
MO01-1_REMIX_LP_03 A Location plan
FO-ENG-306  Remix levels layout
MO01-1_REMIX_SL_22 C Site layout
MO01-1_REMIX_SL_23 C Landscaping layout
MO01-1_REMIX_SL_23-2 A Landscaping layout
MO01-1_REMIX_SL_23_2 A Landscaping layout
MO01-1_REMIX_SL_24 C Material conditions
MO01-1_REMIX_SL_25 C EV charging locations
MO01-1_REMIX_SL_25-1 C EV charging locations
MO01-1_REMIX_SL_25-3 C EV charging locations
MO01-1_REMIX_01 E House type allocation 
Documents to be approved:
 Drainage Statement
 Ecological Mitigation
Page 199

Page 200

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
R2 Ferrylea
Forres
Planning Application Ref Number: 
21/01350/APP
Location Plan
Applicant Name: 
Springfield Properties PLC
Page 200

Page 201

Site Location
Page 201

Page 202

Site Layout
Page 202

Page 203

Auldearn house type
Page 203

Page 204

Type AA
Page 204

Page 205

Type F semi
Page 205

Page 206

16/01664/APP
Page 206

Page 207

16/
Photo 1
Page 207

Page 208

Photo 2
Page 208

Page 209

PLANNING APPLICATION: 21/01350/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.  THE PROPOSAL 
   Remix of 12 consented flats to form 8 flats and 2 semi-detached houses
within a consented housing development, and erection of 16 flats on site
consented for student accommodation and a detached house at Ferrylea,
Forres (currently marketed by the applicant as “Knockomie Braes”).
   The site is split into two parts. 
   The western part would see 8 consented one bedroom flats in 2 two
storey blocks (identified as affordable housing) replaced with 8 two
bedroom flats (proposed to be private). The 8 flats would be arranged in 2
two storey blocks that front to the public road, with parking to the rear (18
spaces) with areas of landscaping on the southern edges of the car park.
The flats proposed would be private.
   The eastern portion of the site covers an area consented for student
accommodation, a detached house and 4 one bedroom flats in a two
storey block. The student accommodation and detached house would be
replaced with 16 one bedroom flats arranged around a courtyard of
parking (20 spaces). The 4 flats consented would be replaced with two
semi-detached houses each with a driveway for three cars. The units
proposed in this part of the site would all be affordable housing. 
2.   THE SITE 
   House plots within a consented housing and a consented 44 bed two
storey student accommodation development. The area of ground subject
to this application is yet to be developed, with the earlier phases to the
north and nearby either completed or under construction.
   The surrounding plots comprise a mix of detached and semi-detached
houses and flats (in two storey blocks of four), with a mix of private and
affordable housing. 
3.   HISTORY 
The designation in which the site sits has been subject to three phases of
development on residential designation R2 – Ferrylea, Forres in the Moray
Local Development Plan 2020 (previously R3 in Moray Local Development Plan
2015 and Moray Local Plan 2008). Phases 1 and 2 are complete and phase 3
is underway and a number of houses are now occupied. 
Page 209

Page 210

Five applications on phase 3 pending consideration alongside this
application: 
21/00941/APP – Revised design of three detached houses on plots 257-259
permitted under 18/01142/APP. Willingness to approve under delegated
powers subject to varied legal agreement. 
21/01217/APP – Remix of 8 houses on plots 267, 296 and 298 – 303 permitted
under 18/01142/APP to 8 flats and three houses pending consideration
alongside this application. 
21/01717/APP – Remix of 12 flats and one detached house to eight flats, two
detached and two semi-detached houses pending consideration alongside this
application. 
21/01801/APP – Remix of 20 flats to 10 flats and two detached houses pending
consideration alongside this application. 
21/01821/APP – Revised design and layout of 16 flats pending consideration
alongside this application. 
Phase 3 
18/01142/APP – Planning permission for 316 residential units refused by the
Planning and Regulatory Services Committee at their meeting of 8 October
2019 and decision notice issued on 16 October 2019. Subsequent appeal to
the Planning and Environmental Appeals Division (Scottish Ministers) allowed
subject to signing of legal agreement to secure development obligations.
Decision issued following signing of legal agreement on 2 July 2020. 
19/01184/APP – Installation of SuDS basin adjacent approved by the Planning
and Regulatory Services Committee at their meeting of 25 February 2020 and
decision notice issued on 28 February 2020. 
19/00615/APP – Erection of student residences (6 flats with 42 bed spaces)
with associated parking and landscaping granted planning permission was
given a willingness to approve by the Planning and Regulatory Services
Committee at their meeting of 8 October 2019 subject to signing of legal
agreement to secure developer obligations. Legal agreement was subsequently
signed and decision issued on 14 July 2020. 
17/00970/PAN – Proposal of Application Notice (PAN) for residential
development and associated infrastructure incorporating the balance of Forres
R3 Ferrylea and Forres LONG 3. This PAN was presented to the Planning and
Regulatory Services Committee on 15 August 2017. Feedback was given by
the Committee on a number of matters that should be taken into account. 
Phase 2 
16/00743/APP – 120 residential units with associated infrastructure granted
planning permission on 28 April 2017 following decision of Planning and
Page 210

Page 211

Regulatory Services Committee meeting of 6 December 2016 to grant consent
subject to conditions and legal agreement. 
15/01861/PAN – PAN for residential development on part of R3 Ferrylea,
Forres. This PAN was reported to the Planning and Regulatory Services
Committee on 1 December 2015. Feedback was given by the Committee on
access arrangements. 
Phase 1 
12/01110/APP – Erection of 129 residential units and community facilities
(dental practice, retail units) with associated infrastructure and landscaping, as
well as masterplan covering the remaining balance of site R3 (up to 380 units)
granted planning consent by Planning and Regulatory Services Committee of
18 December 2012 subject to conditions and legal agreement. 
15/01923/APP – Application for a partial reconfiguration of the site granted
under 12/01110/APP increasing number of units on part of site from 5 to 10
units granted planning consent by Planning and Regulatory Services
Committee of 23 February 2016 subject to conditions. 
10/00048/PAN – Proposal of Application Notice for housing development and
community facilities. 
Phases 1 & 2 - Several applications to vary house types across the consented
phases have been approved. 
4.   POLICY - SEE APPENDIX 
5.   ADVERTISEMENTS 
5.1 Advertised as a departure from the development plan. 
6.   CONSULTATIONS 
Transportation Manager – No objections subject to conditions in relation to
car and cycle parking and EV charging. 
Strategic Planning and Delivery – Quality audit not required due to nature of
amendments proposed, following amendments and clarification, proposal
considered to be an acceptable departure from policy DP1 and PP1 (due to
context of parking on plots 425 & 426). 
Environmental Health – No objections. 
Contaminated Land – No objections. 
Page 211

Page 212

Scottish Water – No objections, sufficient capacity for foul (Forres Waste
Water Treatment Works) and water (Glenlatterach Water Treatment Works)
connections. 
Moray Flood Risk Management – No objections. 
Developer Obligations – Revised developer obligations assessment for wider
development approved under 18/01142/APP in light of amendments proposed
under this and other remix applications. Obligations sought towards:
   Transport – public transport and Orchard Road/Thornhill Road junction
improvement);
   Healthcare – extension to Forres Health Centre, 2 additional dental chairs
and reconfiguration of pharmacy outlets; and
   Sports and Recreation – 3G pitch in Forres. 
Housing – Condition must be applied to ensure 25% affordable housing
provision and 10% accessible housing in private units is provided across the
site permitted under 18/01142/APP. 
7.   OBJECTIONS-REPRESENTATIONS 
None. 
8.   OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. the adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. The main issues are considered below: 
8.2   Principle
The general principle of residential development on this site is established via
the extant consent in place in addition to its designation as a residential
development site in the MLDP. Consideration therefore lies with the suitability
of the proposal in terms of design, siting and servicing arrangements (parking,
drainage, etc.). 
8.3   Design and Siting
Policy PP1 requires new development of 10 or more units to be subject to the
quality audit process, however given this proposal involves the revision of a
small part of a consented development, and there is no change to the street
layout, open space, landscaping, play area, SuDS, etc. in the wider
development, there is limited scope to apply the quality audit process to this
application. Nonetheless the requirements of policies PP1 and DP1 must still
be considered. 
8.3.1 The layout of the wider development in which this proposal sits will remain
largely unchanged, with housing to the south and east remaining as consented.
The proposed layout for the eastern portion of the application site would see
two blocks of flats front to the public road to the east, with parking contained to
Page 212

Page 213

the rear (and shared with 6 flats to the north proposed under 21/01717/APP).
With regard to the western portion of the site, the flats are arranged so that two
blocks of flats front to the public road to the east, with parking contained to the
side/rear, whilst the other two blocks would be adjacent to Mannachie Road.
The two houses (plots to the south) continue the pattern of development of their
neighbouring houses to the east, though parking is to the front of these units. 
8.3.2 This layout results in a strong frontage to the public road and ensures more
than 50% of parking is contained to the rear for the flats. When considered
alongside the existing layout of the site and amendments elsewhere, this
portion of the site is considered to have a suitable balance of built form, parking
and landscaping/open space. Although the two houses in plots 425 & 426 have
parking to the front, this is in keeping with the pattern of development on this
section of street, and is considered to be an acceptable departure from policies
DP1 and PP1. These units are also set back from the main roads through the
site, so their parking will not occupy a prevalent position. 
8.3.3  The houses and flats themselves are all “house types” that have been used
elsewhere on the wider site permitted under 18/01142/APP. These are
therefore in keeping with the common identity established by the applicant’s
housebuilding style on this site and elsewhere in the region. Under
18/01142/APP the site was split into different character areas, whereby the use
of varying external material finishes to the buildings, landscaping and surfacing
materials allowed the development to have a mix in finishes to offer a degree of
variety and legibility to the housing development. This proposal has proposed a
slight difference to the material finishes, but a condition will be applied to
ensure material finishes match those of the established character areas under
the original consent. 
8.3.4  The position of the houses and flats subject to this application do not give rise
to any amenity issues in terms of significant adverse overlooking,
overshadowing and loss of light to neighbouring house plots. 
8.3.5  As noted above the proposed car parking arrangement for the flats has allowed
for the 50% requirement of parking to the side and rear of the building line
under policy PP1. This reduces the dominance of parked cars on the street
scene compared with extant consent. This parking is broken up at an interval of
every 4 spaces with shrub planting. 
8.3.6  Sufficient landscaping has been proposed, with hedge boundary treatment
where flats have a road frontage, though location of shrub details has not been
demonstrated, this can be requested via a condition. The species are suitable
for the character areas established under 18/01142/APP. 
8.3.7  Aside from the minor departure matter on parking for plots 425 and 426, the
design and siting of the proposal is considered to comply with policies PP1 and
DP1 in all other regards. 
8.4   Biodiversity
Under policy EP2, new development proposal of four or more houses must
ensure they safeguard and enhance biodiversity. In this case a biodiversity
statement provided with the application has identified that landscaping, along
Page 213

Page 214

with bat and bird boxes will be provided in order to enhance biodiversity.
Subject to condition ensuring the specific location for these measures is
identified (as part of the wider landscaping proposals) and given the scale and
type of development (remixing a consented scheme), the proposed biodiversity
measures are considered to be acceptable in terms of policy EP2. 
8.5   Parking and Access
The proposed parking arrangement is considered suitable, with the
Transportation Manager raising no objections to this proposal, subject to
conditions ensuring electric vehicle charging infrastructure can be
accommodated within the development, cycle parking is provided for flats and
ensuring parking provision is maintained at the numbers proposed. Subject to
these conditions, the proposal is considered to comply with the requirements of
policies PP3 and DP1 in respect of parking and access. 
8.6   Drainage and Water
Existing drainage arrangements consented under application 18/01142/APP
will be amended to accommodate the revised proposal subject to this
application. Moray Flood Risk Management have raised no objections to the
proposal in regards to design 
8.7   Developer Obligations
In light of the revisions to this application along with other amendments
proposed (see history), an updated developer obligations assessment has been
undertaken for the site. The developer has agreed to the heads of terms of
these obligations and following determination of this consent (and the others),
the legal agreement will be varied to take account of these amendments.
Subject to this being undertaken the proposal complies with policy PP3. 
8.8   Affordable and Accessible Housing
The revisions proposed have impacted on the provision of affordable housing.
The extant consent provides 25% affordable housing, and policy DP2 requires
25% to be provided on any housing development of four or more units. In light
of the amendments proposed there is a net increase of 5 units as a result of
this proposal and others being considered alongside this application. The
Housing Manager has not objected to this application but has recommended
the proposal be subject to a condition ensuring affordable housing is provided
at a rate of 25% across phase 3 (covered under application 18/01142/APP and
the student accommodation site (19/00615/APP)). The overall number of units
indicated as affordable demonstrates 25% will be provided. A condition will be
placed ensuring those units identified as affordable will be provided as such. 
8.8.1  Whilst there is no increase in the number of accessible units as a result of this
and all other remix applications pending consideration alongside this
application, the overall provision of accessible housing exceeds 10% under the
original phase 3 consent 18/01142/APP (now 22%). 
8.8.2  Taking account of the above considerations there is no conflict with policy DP2. 
Page 214

Page 215

Conclusion and Recommendation
The proposed remix comprises a suitable form of development in terms of
siting, design, layout, and can be served by suitable infrastructure (either
existing or proposed as part of this proposal or the original consent for the
housing development). It therefore complies with relevant policies of the MLDP
apart from parking on plots 425 and 426, the arrangement of which is
considered to be an acceptable departure from policies DP1 and PP1. Approval
is therefore recommended subject to conditions, but consent should be held
until the developer has entered into a varied legal agreement of that in place
under planning permission 18/01142/APP to secure developer obligations. 
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal is considered to be an acceptable departure from policies DP1
and PP1 of the Moray Local Development Plan 2020 because parking for plots
425 and 426 do not have 50% of their parking to the side or rear of the plot,
however this is in keeping with the established character of the consented
development in which they sit. The proposal complies with the Moray Local
Development Plan 2020 in all other respects and there are no material
considerations that indicate otherwise. 
Author/Contact
Officer:
Andrew Miller            
Senior Planning Officer
Ext: 01343 563274 
Beverly Smith
Development Management & Building Standards Manager
Page 215

Page 216

Page 216

Page 217

APPENDIX 
POLICY 
Moray Local Development Plan 2020 
PP1 PLACEMAKING 
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(i) Character and Identity
• Create places that are distinctive to prevent homogenous 'anywhere'
development;
• Provide a number of character areas reflecting site characteristics that
have their own distinctive identity and are clearly distinguishable;
• Provide distinctiveness between and in each character area through a
combination of measures including variation in urban form, street
structure/network, architecture and masonry, accent features (such as
porches), surrounds and detailing, materials (buildings and surfaces),
colour, boundary treatments, hard/soft landscaping and a variety of
approaches to tree species and planting that emphasises the hierarchy of
open spaces and streets within a cohesive design strategy for the whole
development;
• Distinctiveness must be reinforced along main thoroughfares, open
spaces and places where people may congregate such as
shopping/service centres;
• Retain, incorporate and/or respond to relevant elements of the landscape
such as topography and planted features, natural and historic
environment, and propose street naming (in residential developments of
20 units and above, where proposed names are to be submitted with the
planning application) to retain and enhance local associations; 
Page 217

Page 218

(ii) Healthier, Safer Environments
• Designed to prevent crime, fear of crime and anti-social behaviour with
good levels of natural surveillance and security using treatments such as
low boundary walls, dual frontages (principal rooms) and well-lit routes to
encourage social interaction.  Unbroken high boundary treatments such
as wooden fencing and blank gables onto routes, open spaces and
communal areas will not be acceptable.
• Designed to encourage physical exercise for people of all abilities.
• Create a distinctive urban form with landmarks, key buildings, vistas,
gateways and public art to provide good orientation and navigation
through the development.
• Provide a mix of compatible uses, where indicated within settlement
statements, integrated into the fabric of buildings within the street.
• Prioritise pedestrians and cyclists by providing a permeable movement
framework that incorporates desire lines (including connecting to and
upgrading existing desire lines) and is fully integrated with the surrounding
network to create walkable neighbourhoods and encourage physical
activity.
• Integrate multi- functional active travel routes, green and open space into
layout and design, to create well connected places that encourage
physical activity, provide attractive spaces for people to interact and to
connect with nature.
• Create safe streets that influence driver behaviour to reduce vehicle
speeds that are appropriate to the local context such as through shorter
streets, reduced visibility and varying the building line.
• Provide seating opportunities within streets, paths and open spaces for all
generations and mobility's to interact, participate in activity, and rest and
reflect.
• Provide for people with mobility problems or a disability to access
buildings, places and open spaces.
• Create development with public fronts and private backs. 
• Maximise environmental benefits through the orientation of buildings,
streets and open space to maximise the health benefits associated with
solar gain and wind shelter. 
(iii) Housing Mix
• Provide a wide range of well integrated tenures, including a range of
house types and plot sizes for different household sizes, incomes and
generations and meet the affordable and accessible requirements of
policy DP2 Housing.
• All tenures of housing should have equal access to amenities, greenspace
and active travel routes. 
(iv) Open Spaces/Landscaping
• Provide accessible, multi-functional open space within a clearly defined
hierarchy integrated into the development and connected via an active
travel network of  green/blue corridors that are fully incorporated into the
development and to the surrounding area, and meet the requirements of
policy EP5 Open Space and the Open Space Strategy Supplementary
Guidance and Policy EP12 Managing the Water Environment and
Drainage Impact Assessment for New Developments Supplementary
Guidance.
Page 218

Page 219

• Landscaped areas must provide seasonal variation, (mix of planting and
colour) including native planting for pollination and food production.
• Landscaping areas that because of their size, shape or location would not
form any useable space or that will not positively contribute to the
character of an area will not contribute to the open space requirements of
Policy EP4 Open Space.
• Semi-mature tree planting and shrubs must be provided along all routes
with the variety of approaches reflecting and accentuating the street
hierarchy.
• Public and private space must be clearly defined.
• Play areas (where identified) must be inclusive, providing equipment so
the facility is for every child/young person regardless of ability and
provided upon completion of 50% of the character area.
• Proposals must provide advance landscaping identified in site
designations and meet the quality requirements of policy EP5 Open
Space.
• Structural landscaping must incorporate countryside style paths (such as
bound or compacted gravel) with waymarkers.
•  Maintenance arrangements for all paths, trees, hedging, shrubs, play/
sports areas, roundabouts and other open/ green spaces and blue/green
corridors must be provided. 
v) Biodiversity
• Create a variety of high quality multi- functional green/blue spaces and
networks that connect people and nature, that include trees, hedges and
planting to enhance biodiversity and support habitats/wildlife and comply
with policy EP2 Biodiversity and Geodiversity and EP5 Open Space.
• A plan detailing how different elements of the development will contribute
to supporting biodiversity must be included in the design statement
submitted with the planning application.
• Integrate green and blue infrastructure such as swales, permeable paving,
SUDS ponds, green roofs and walls and grass/wildflower verges into
streets, parking areas and plots to sustainably address drainage and
flooding issues and enhance biodiversity from the outset of the
development.
• Developments must safeguard and where physically possible extend or
enhance wildlife corridors and green/blue networks and prevent
fragmentation of existing habitats. 
(vi) Parking
• Car parking must not dominate the streetscape to the front or rear of
properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum
of 50% car parking within the front curtilage or on street, subject to the
visual impact being mitigated by hedging, low stone boundary walls or
other acceptable treatments that enhance the streetscape.
• Provide semi-mature trees and planting within communal private and
public/visitor parking areas and on-street parking at a maximum interval of
4 car parking spaces.
• Secure and covered cycle parking and storage, car sharing spaces and
electric car charging points must be provided in accordance with policy
DP1 Development Principles.
Page 219

Page 220

• Parking areas must use a variation in materials to reduce the visual
impact on the streetscene. 
(vii) Street Layout and Detail
• Provide a clear hierarchy of streets reinforced through street width,
building density and street and building design, materials, hard/soft
landscaping and a variety of approaches to tree planting and shrubs.
• Streets and connecting routes should encourage walking and cycling over
use of the private car by providing well connected, safe and appealing
routes.
• Design junctions to prioritise pedestrians, accommodate active travel and
public transport and service/emergency vehicles to reflect the context and
urban form and ensure that the street pattern is not standardised.  
• Dead-end streets/cul-de-sacs will only be selectively permitted such as on
rural edges or where topography, site size, shape or relationship to
adjacent developments prevent an alternative more permeable layout.
These must be short, serving no more than 10 units and provide walking
and cycling through routes to maximise connectivity to the surrounding
area.
• Where a roundabout forms a gateway into, or a landmark within, a town
and/or a development, it must be designed to create a gateway feature or
to contribute positively to the character of the area.
• Design principles for street layouts must be informed by a Street
Engineering Review (SER) and align with Roads Construction Consent
(RCC) to provide certainty that the development will be delivered as per
the planning consent. 
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan.¬¬¬ 
(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space. 
Page 220

Page 221

ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS. 
ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use. 
Page 221

Page 222

b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours 
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations 
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment. 
Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
Page 222

Page 223

the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
Page 223

Page 224

f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. 
Alterations and extensions must be compatible with the character of the
existing building in terms of design, form, choice of materials and positioning
and meet all other relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
Page 224

Page 225

e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2. 
f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
Page 225

Page 226

g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry. 
h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
DP2 HOUSING
a) Proposals for development on all designated and windfall housing sites must include
a design statement and shall include supporting information regarding the
comprehensive layout and development of the whole site, addressing infrastructure,
access for pedestrians, cyclists, public transport and service vehicles, landscaping,
drainage, affordable and accessible housing and other matters as may be required
by the planning authority, unless these requirements are not specified in the site
designation or are considered not to be required. 
Proposals must comply with Policy PP1, DP1, the site development requirements
within the settlement plans, all other relevant policies within the Plan and must
comply with the following requirements; 
b) Piecemeal/ individual plot development proposals 
Piecemeal and individual/ plot development proposals will only be acceptable where
details for the comprehensive redevelopment of the site are provided to the
satisfaction of the planning authority and proposals comply with the terms of Policy
DP1, other relevant policies including access, affordable and accessible housing,
landscaping and open space and where appropriate key design principles and site
designation requirements are met. 
Proposals for piecemeal/ plot development must be accompanied by a Delivery Plan
setting out how the comprehensive development of the site will be achieved.              
c) Housing density 
Capacity figures indicated within site designations are indicative only. Proposed
capacities will be considered through the Quality Auditing process against the
characteristics of the site, character of the surrounding area, conformity with all
policies and the requirements of good Placemaking as set out in Policies PP1 and
DP1. 
d) Affordable Housing 
Proposals for all housing developments (including conversions) must provide a
contribution towards the provision of affordable housing. 
Proposals for new housing developments of 4 or more units (including conversions)
must provide 25% of the total units as affordable housing in  affordable tenures to be
agreed by the Housing Strategy and Development Manager. For proposals of less
than 4 market housing units a commuted payment will be required towards meeting
housing needs in the local housing market area. 
A higher percentage contribution will be considered subject to funding availability, as
informed by the Local Housing Strategy. A lesser contribution or alternative in the
form of off-site provision or a commuted payment will only be considered where
exceptional site development costs or other project viability issues are demonstrated
and agreed by the Housing Strategy and Development Manager and the Strategic
Planning and Development Manager. Intermediate tenures will be considered in
Page 226

Page 227

accordance with the HNDA and Local Housing Strategy, and agreed with the
Housing Strategy and Development Manager. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 40. 
e) Housing Mix and Tenure Integration   
Proposals must demonstrate tenure integration and meet the following criteria; 
• Architectural style and external finishes must ensure that homes are tenure
blind 
• The spatial mix must ensure communities are integrated to share school
catchment areas, open spaces, play areas, sports areas, bus stops and other
community facilities. 
f) Accessible Housing 
Housing proposals of 10 or more units incorporating affordable housing will be
required to provide 10% of the private sector units to wheelchair accessible standard.
Flexibility may be applied on sites where topography would be particularly
challenging for wheelchair users. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 41. 
POLICY GUIDANCE NOTE- AFFORDABLE AND ACCESSIBLE HOUSING
Affordable Housing
Providing affordable housing is a key priority for Moray Council and this is reflected in the
Local Outcomes Improvement Plan (LOIP) and the Local Housing Strategy (LHS). The
Council's Housing Need and Demand Assessment 2017 highlights the significant
requirement for affordable housing in Moray, which is a national issue, resulting from  a
number of factors including affordability issues, downturn in the economy and the
shortage of public and private sector rented houses. 
Planning policies assist with the provision of affordable housing, which is defined in
Scottish Planning Policy (SPP) as; 
"housing of a reasonable quality that is affordable to people on modest incomes.
Affordable housing may be provided in the form of social rented accommodation, mid-
market rented accommodation, shared ownership housing, shared equity housing,
housing sold at a discount (including plots for self -build and low cost housing without
subsidy." This local development plan regards lower quartile earnings as "modest
incomes". 
The 2017 HNDA identified a requirement for 56% of all need and demand to be affordable
units in Moray between 2017 and 2035. This Local Development Plan has lowered the
threshold so that individual house proposals are required to make a contribution towards
affordable housing provision, which is intended to ensure proposals do not circumnavigate
the policy and provide a fair and transparent process. 
Page 227

Page 228

A number of variables influence affordability of housing, including mortgage deposit
requirements, mortgage interest rates, lower quartile house prices, lower quartile private
rents, lower quartile full time gross earnings. Changes in these variables will affect the
affordability of housing in Moray. The maximum affordable rent and maximum affordable
house purchase prices is published on the Council's website at
http://www.moray.gov.uk/moray_standard/page_90100.html. The current Local Housing
Allowance will be used as a proxy for average private sector rents.
Affordable housing should be provided on site and as part of a mixed development of
private and affordable units. To meet the need for affordable housing there may be
proposals for 100% provision of affordable housing and these will be acceptable as part of
a wider mixed community, provided all other  Local Development Plan policies are met. 
The policy requires single house proposals to make a commuted sum payment as a
developer obligation towards affordable housing, with the cost figure published annually
on the Council website at http://www.moray.gov.uk/moray_standard/page_94665.html and
determined by the District Valuer's assessment of the value of serviced land for affordable
housing in Moray. This allows developers to be clear at the outset of a project about the
potential cost of commuted payments and should be reflected in land values. 
The type of affordable housing to be provided will be determined by the Housing and
Property service. Developers should contact Housing and Property as early as possible.
Housing and Property will decide whether a commuted payment or affordable units will be
required on a site by site basis.   Housing and Property will provide developers with an
affordable housing mix, detailing the size and type of housing required based on
HNDA/LHS requirements. 
The Council will consider the following categories of affordable housing within the context
of the needs identified in the HNDA/ LHS;
• Social rented accommodation- housing provided by an affordable rent managed by a
Registered Social Landlord such as a housing association or another body regulated
by the Scottish Housing Regulator, including Moray Council.
• Mid-market rent accommodation- housing with rents set at a level higher than purely
social rent, but lower than market rent levels and affordable by households in
housing need. Mid-market rent housing can be provided by the private and social
housing sectors.
• Shared equity housing- sales to low income households, administered through a
Scottish Government scheme e.g. Low-cost initiative for First Time Buyers (LIFT). 
Any proposals to provide affordable housing in a form other than those listed above, must
demonstrate that the cost to the householder is "affordable" in the Moray context and that
the property will remain "affordable" in perpetuity. 
Affordable housing requirement figures will be rounded up. 
The Strategic Housing Investment Plan (SHIP) is produced annually by the Council and
identifies details of the proposed delivery of affordable housing. 
Accessible housing
Scottish Planning Policy states (para 28) that "the aim is to achieve the right development
in the right place; it is not to allow development at any cost" and "that policies and
decisions should be……supporting delivery of accessible housing."
Policy DP2 aims to;
Page 228

Page 229

• Assist the Council, the NHS and the Health and Social Care Moray to meet the
challenges presented by our ageing population and the shared aim of helping people
to live well at home or in a homely setting. The HNDA 2017 demonstrates that
Moray's population is ageing and there is a trend towards older and smaller
households. 
• Provide increased choice of tenure to people with physical disabilities or mobility
impairments, by increasing the supply of accessible housing in the private sector.
There is currently a mismatch between the size and type of housing required and the
size and type of housing available across all tenures. This mismatch, along with
increasing housing needs associated with physical disability, are the likely drivers of
owner occupiers seeking public sector accessible housing to meet medical needs. 
Accessible/ adapted housing can promote independence and wellbeing for older or
disabled people, can facilitate self- care, informal care and unpaid care, potentially prevent
falls and hospital admissions and can delay entry into residential care. 
Policy DP2 requires that housing proposals of 10 or more units incorporating affordable
housingmust provide 10% of the private sector units to wheelchair accessible standard
where all the rooms are accessible to a wheelchair user. 
This applies to new build and conversion/ redevelopment projects. Flexibility may apply
where there is extremely challenging topography or where the site is in a remote location.
For the purposes of Policy DP2, "remote" locations are defined as being rural areas
outside settlement and Rural Grouping boundaries as defined in the Local Development
Plan. 
Accessible units should be in a location which provides convenient access, in terms of
distance, gradient and available public transport, to reach the facilities needed for
independent living. Small, low maintenance gardens are generally regarded as a positive
feature by this customer group. 
New wheelchair accessible housing in any tenure must comply with Housing for Varying
Needs Standards (HfVNs), including the standards specific to dwellings for wheelchair
users. HfVNs is available at
http://webarchive.nationalarchives.gov.uk/20131205115152uo_/http://www.archive2.officia
l-documents.co.uk/document/deps/cs/HousingOutput/start.htm 
The specific design specification required to meet the terms of this policy are;
External requirements
• location(s) convenient for amenities and facilities e.g. public transport, local shops
etc
• car parking space as close as possible to the entrance door and at a maximum
distance of 15m (HfVNs para 7.13.4 refers).
• Step free paths within curtilage, ramp gradients preferably of 1:20 but no steeper
than 1:12 (HfVNs para 7.7.1 refers) 
Internal requirements
• Hallways- minimum 1200mm wide (HfVNs para 10.2.3 refers)
• Door frames- minimum 926mm wide door leaf, giving a clear width of 870mm (HfVNs
para 10.5.7 refers)
Page 229

Page 230

• Bathrooms/ wet rooms- 1500mm wheelchair turning circle required (HfVNs para
14.9.2 refers) 
Accessible housing requirement figures will be rounded down. 
All proposals for new build or converted housing should set out details of how they will
comply with this policy in their planning application. 
EP2 BIODIVERSITY
All development proposals must, where possible, retain, protect and enhance features of
biological interest and provide for their appropriate management.  Development must
safeguard and where physically possible extend or enhance wildlife corridors and
green/blue networks and prevent fragmentation of existing habitats. 
Development should integrate measures to enhance biodiversity as part of multi-functional
spaces/ routes. 
Proposals for 4 or more housing units or 1000 m2 or more of commercial floorspace must
create new or, where appropriate, enhance natural habitats of ecological and amenity
value. 
Developers must demonstrate, through a Placemaking Statement where required by
Policy PP1 which incorporates a Biodiversity Plan, that they have included biodiversity
features in the design of the development. Habitat creation can be achieved by providing
links into existing green and blue networks, wildlife friendly features such as wildflower
verges and meadows, bird and bat boxes, amphibian friendly kerbing, wildlife crossing
points such as hedgehog highways and planting to encourage pollination, wildlife friendly
climbing plants, use of hedges rather than fences, incorporating biodiversity measures into
SUDS and retaining some standing or lying dead wood, allotments, orchards and
woodlands. 
Where development would result in loss of natural habitats of ecological amenity value,
compensatory habitat creation will be required where deemed appropriate. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application. 
Level 1 -  a flood statement with basic information with regard to flood risk.
Page 230

Page 231

Level 2 -  full flood risk assessment providing details of flood risk from all sources,
results of hydrological and hydraulic studies and any appropriate
proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood
risk will be required and any loss of flood storage capacity mitigated to achieve
a neutral or better outcome. Water resistant materials and construction must be
Page 231

Page 232

used where appropriate. Land raising and elevated buildings on structures such
as stilts are unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
Page 232

Page 233

presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side)
(top of bank) 
Less than 1m 6m
1-5m 6-12m
5-15m 12-20m
15m+ 20m+ 
The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP13 FOUL DRAINAGE 
All development within or close to settlements (as defined in the Local Development Plan)
of more than 2,000 population must connect to the public sewerage system unless
connection  is not permitted due to lack of capacity. In such circumstances, temporary
provision of private sewerage systems may be allowed provided Scottish Water has
confirmed investment to address this constraint has been allocated within its investment
Programme and the following requirements have been met; 
• Systems must not have an adverse effect on the water environment
• Systems must be designed and built to a standard which will allow adoption by
Scottish Water
• Systems must be designed such that they can be easily connected to a public sewer
in the future. Typically this will mean providing a drainage line up to a likely point of
connection. 
All development within or close to settlements (as above) of less than 2,000 population will
require to connect to public sewerage except where a compelling case is made otherwise.
Factors to be considered in such a case will include size of the proposed development,
whether the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Page 233

Page 234

Where a compelling case is made, a private system may be acceptable provided it does
not pose or add a risk of detrimental effects, including cumulative, to the natural and built
environment, surrounding uses or amenity of the general area. 
Where a private system is deemed to be acceptable, within settlements as above or small
scale development in the countryside, a discharge to land, either full soakaway or raised
mound soakaway, compatible with Technical Handbooks (which sets out guidance on how
proposals may meet the Building  Regulations) must be explored prior to considering a
discharge to surface waters. 
EP14 POLLUTION, CONTAMINATION & HAZARDS
a)  Pollution
Development proposals which may cause significant air, water, soil, light or noise
pollution or exacerbate existing issues must be accompanied by a detailed
assessment report on the levels, character and transmission of the potential pollution
with measures to mitigate impacts. Where significant or unacceptable impacts
cannot be mitigated, proposals will be refused.   
b) Contamination
Development proposals on potentially contaminated land will be approved where
they comply with other relevant policies and; 
i) The applicant can demonstrate through site investigations and risk assessment,
that the site is in a condition suitable for the proposed development and is not
causing significant pollution of the environment; and
ii) Where necessary, effective remediation measures are agreed to ensure the
site is made suitable for the new use and to ensure appropriate disposal and/ or
treatment of any hazardous material. 
c) Hazardous sites
Development proposals must avoid and not impact upon hazardous sites or result in
public safety concerns due to proximity or use in the vicinity of hazardous sites. 
R2 Ferrylea  22.2ha  380 units 
• Phases 1 and 2 of development has commenced with 249 units consented.
• A masterplan is required, incorporating land at West Park Croft, showing connections
between all areas, proposed landscaping, the required affordable and accessible
housing and required buffer to the gas pipeline.
• Lowering of density onto the rural edge required.
• Pocket park within south eastern part of site required.
• Transport Assessment required.
• Junction improvements required within Forres, scale to be determined through the
Transport Assessment.
• Widening of Mannachie Road along frontage of site to 6m and provision of a 3m
wide cycle path to the west side connecting to the north and completing any missing
sections between the site and the existing network to the north required.
• Contribution required towards path widening along Mannachie Road to 3m wide from
development to core path FR22 (including provision for a crossing).
• Widening of Mannachie Road to 5.5m from Link Road access, south to access to
West Park Croft and safeguarding for future widening within site boundary beyond
this is required. 
Page 234

Page 235

• Assessment for additional bus stop infrastructure within the frontage of the
development must be considered as part of the overall R2/R4/R6 bus stop
infrastructure provision and accessibility to bus stops. 
• A developer contribution towards public transport will be sought.
• Path links must be provided to the woodland to the south of the site, and north into
adjacent housing at Mannachie Brae.
• Flood Risk Assessment (FRA) required.
• Drainage Impact Assessment (DIA) required.
• Phase 1 Habitat Survey required.
• Archaeological targeted evaluation (10%) of known features and monitored topsoil
strip of all remaining areas required. 
Page 235

Page 236

Page 236

Page 237

WARD 08_17 
21/01717/APP
2nd November 2021
Substitution of house types at plots nos 156-160 204-211
246 247 and 257-259 renumbered 443-454 Phase 3 (as
per application 18/01142/APP) R2 Ferrylea Forres Moray 
for Springfield Properties PLC 
Comments: 
 The proposal has previously been reported to Committee and the appointed
officer considers that significant implications of this proposal in conjunction with
18/01142/APP have been made for Committee to reconsider the development.
 The application has been advertised as a departure from the development plan,
though following amendments is no longer considered to be a departure from the
development plan.
 No objections received. 
Procedure: 
 If members are minded to approve as per the recommendation, then a
modification of the existing legal agreement attached to planning permission ref
18/01142/APP (as permitted under appeal decision notice PPA-300-2057) is
required prior to issue of planning consent.
 Request delegated authority to the Head of Economic Growth and Development
to withhold issue of consent until expiry of advert expiry period (28 June) to review
any late representations received. 
Recommendation Grant planning permission subject to conditions: 
Conditions/Reasons 
1. The development hereby granted planning permission forms part of, and is related
to, a development granted planning permission under formal planning appeal
decision notice PPA-300-2057 by the Planning and Environmental Appeals
Division, Scottish Government dated 2 July 2020 wherein:
a.   the terms and conditions as attached to the permission granted under that
decision notice are hereby re-iterated and remain in force in so far as they
relate to the development hereby approved, namely conditions 4, 5, 17-20,
including any details already approved thereunder to discharge the
requirements of those conditions; and
b.   no part of the development as hereby granted shall be exercised in
conjunction with, or in addition to, the building design and plot layout details
already approved for plots 156 – 160 and 204 - 211 (now identified under
this permission as plots 443 – 452).
Item 10
Page 237

Page 238

Reason: To ensure a satisfactory form of development and that it progresses in
accordance with the already approved and required details, and that only one
permission is implemented on plots 156 – 160 and 204 – 211 (now identified as
plots 443 – 452). 
2. Prior to any development commencing and notwithstanding the details shown on
the approved plans, a scheme of external material finishes of the houses and flats
that match those of consented neighbouring plots shall be submitted to and
approved in writing by the Council, as Planning Authority. Thereafter the
development shall be implemented in accordance with the approved details. 
Reason: To ensure suitable material finishes to each plot, in the interests of the
character of the development in which the house plots sit. 
3. No development shall commence until details (Location and Design plans) have
been submitted for approval by the Planning Authority in consultation with the
Roads Authority showing the provision of secure cycle parking facilities at a rate of
not less than 1 space per flat. Thereafter the cycle parking shall be provided prior
to completion of the associated flats and retained and maintained for that purpose
unless otherwise agree in writing by the Planning Authority in consultation with the
Roads Authority. 
Reason: In the interests of an acceptable form of development and the provision
of cycle parking infrastructure to support the use of low carbon transport, through
the provision of details currently lacking. 
4. Notwithstanding the details submitted. No development works shall commence
until a detailed drawing (scale 1:200) has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority confirming the provision of, or location where future Electric Vehicle (EV)
charging unit(s) can be connected to an appropriate electricity supply, including
details (written proposals and/ or plans) to confirm the provision of the necessary
cabling, ducting, and consumer units capable of supporting the future charging
unit and infrastructure; and thereafter the EV charging infrastructure shall be
provided in accordance with the approved drawing and details prior to the
completion of the dwelling house. 
Reason: In the interests of an acceptable form of development and the provision
of infrastructure to support the use of low carbon transport, through the provision
of details currently lacking. 
5. Parking provision for houses shall be provided at the following rates:
   1 Bedroom = 1 space
   2 -3 Bedrooms = 2 spaces
   4 or more bedrooms = 3 spaces 
Parking shall be provided prior to the completion of each house which it is
associated with and thereafter retained and available for that purpose unless
otherwise agreed in writing by the Planning Authority in consultation with the
Roads Authority.
Page 238

Page 239

Reason: To ensure the permanent availability of the level of parking necessary for
residents/visitors/others in the interests of an acceptable development and road
safety.   
6. No boundary fences, hedges, walls or any other obstruction whatsoever over
0.6m in height and fronting onto the public road shall be within 2.4m of the edge of
the carriageway. 
Reason: To enable drivers of vehicles entering or exiting the site to have a clear
view so that they can undertake the manoeuvre safely and with the minimum
interference to the safety and free flow of traffic on the public road. 
7. The landscaping as shown in drawing numbers MO01-1_Remix_SL_42 Rev A
and MO01-1_Remix_SL_43 Rev A hereby approved shall be provided by no later
than the first planting season after completion or first occupation (whichever is the
soonest) of the respective house plot/block of flats to which the landscaping
relates. Any trees, shrubs and hedge plantings which within a period of 5 years
from planting die, are removed or become seriously damaged or diseased shall be
replaced in the following planting season with others of similar size, number and
spacing unless the Planning Authority gives written consent to any variation of this
condition. 
Reason: In order to ensure that the approved landscaping works are timeously
carried out and properly maintained in a manner which will not adversely affect the
amenity, appearance, character and quality of the development and the
surrounding area. 
8. No development shall commence unless a plan showing the location of all natural
habitat creations, as indicated in the submitted document “Forres Bird and Bat
Boxes” has been submitted and approved in writing by the Council, as Planning
Authority. This plan shall also include timing for provision of the respective
measures. Thereafter the natural habitat creations shall be retained unless
otherwise agreed in writing with the Council, as Planning Authority. 
Reason: In order to agree the position of the biodiversity measures and ensure
they are provided timeously. 
9. No development shall commence until a scheme for the provision of a communal
bin storage area for flatted properties in the development has been submitted to
and approved in writing by the Planning Authority. Thereafter, no flats shall be
brought into use unless they are served by the bin storage facilities as approved
under this condition for their respective block. 
Reason: In order to ensure the flatted properties are served by suitable recycling
and refuse facilities. 
Page 239

Page 240

Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal complies with the Moray Local Development Plan 2020 and there
are no material considerations that indicate otherwise.   
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
This decision notice must be read in conjunction with the terms of the planning
obligation that has been entered into in respect of this development under Section
75 of the Town and Country Planning (Scotland) Act 1997 (as amended). The
agreement is available for inspection on the Moray Council online planning
register. 
A Building Warrant will be required for the proposals.  Should you require further
assistance please do not hesitate to contact Building Standards, Environmental
Services Department, Council Office, High Street, ELGIN IV30 1BX or by
telephoning 0300 1234561. 
The TRANSPORTATION MANAGER has made the following comments:- 
Before commencing development, the applicant is obliged to apply for
Construction Consent in accordance with Section 21 of the Roads (Scotland) Act
1984 for new roads. The implications for the proposed changes on any existing
Roads Construction Consent must be addressed. The applicant will be required to
provide technical information, including drawings and drainage calculations, and
provide a Road Bond to cover the full value of the works in accordance with the
Security for Private Road Works (Scotland) 1985 Regulations. Advice on this
matter can be obtained from the Moray Council web site or by emailing
transport.develop@moray.gov.uk 
The provision of Electric Vehicle (EV) chargers and/or associated infrastructure
shall be provided in accordance with Moray Council guidelines. Cabling between
charging units and parking spaces must not cross or obstruct the public road
including footways. Infrastructure provided to enable EV charging must be
retained for this purpose for the lifetime of the development unless otherwise
agreed in writing by the Planning Authority.   Guidance on Electric Vehicle (EV)
Charging requirements can be found at:
http://www.moray.gov.uk/downloads/file134860.pdf 
Public utility apparatus may be affected by this proposal.  Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority.
Page 240

Page 241

The applicant shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
1104DT AS-90 C Lauder house type
1237DT ASO-901  B Nairn house type
901  Cottage apartments
932TE AS-901 A Dallachy house type
FO-ENG-306  Remix levels layout
MO01-1_REMIX_LP_05  Location plan
MO01-1_REMIX_SL_43-1  A Landscaping layout
MO01-1_REMIX_SL_45-2  EV charging locations
MO01-1_REMIX_SL_45-3  EV charging locations 
MO01-1_REMIX_01  E House type allocation
MO01-1_REMIX_SL_42  A Site layout
MO01-1_REMIX_SL_43  A Landscaping layout
MO01-1_REMIX_SL_44  A Material conditions
MO01-1_REMIX_SL_45  A EV charging locations
MO01-1_REMIX_SL_45-1  A EV charging locations 
Documents to be approved:
 Ecological Statement
 Drainage Statement
Page 241

Page 242

Page 242

Page 243

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
R2 Ferrylea
Forres
Planning Application Ref Number: 
21/01717/APP
Location Plan
Applicant Name: 
Springfield Properties PLC
Page 243

Page 244

Site Location
Page 244

Page 245

Site Layout
Page 245

Page 246

16/01664/APP
Page 246

Page 247

Photo 1
16/
Page 247

Page 248

Photo 2
Page 248

Page 249

PLANNING APPLICATION: 21/01717/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1. THE PROPOSAL 
   Remix of 12 consented flats and a detached house to form 6 flats, 2
detached houses and 2 semi-detached houses within a consented
housing development at Ferrylea, Forres (currently marketed by the
applicant as “Knockomie Braes”).
   Two blocks of flats would be a Moray & Dunbar type, comprising a two
storey block of 6 flats with associated parking (shared with flats proposed
under application 21/01350/APP – see History below). Ground floor flats
would have a patio and first floor flats would have balconies. There would
be solar panels on the roof of the flats.
   The detached houses would be served by private driveways.
   All units proposed under this application would be private. 
2. THE SITE 
   House plots within a consented housing development. The area of ground
subject to this application is yet to be developed, with the earlier phases
nearby either completed or under construction.
   The surrounding plots comprise a mix of detached and semi-detached
houses and flats (in two storey blocks of four), with a mix of private and
affordable housing. 
3. HISTORY 
The designation in which the site sits has been subject to three phases of
development on residential designation R2 – Ferrylea, Forres in the Moray
Local Development Plan 2020 (previously R3 in Moray Local Development Plan
2015 and Moray Local Development Plan 2008). Phases 1 and 2 are complete
and phase 3 is underway and a number of houses are now occupied. 
Five applications on phase 3 pending consideration alongside this
application: 
21/00941/APP – Revised design of three detached houses on plots 257-259
permitted under 18/01142/APP. Willingness to approve under delegated
powers subject to varied legal agreement. 
Page 249

Page 250

21/01217/APP – Remix of 8 houses on plots 267, 296 and 298 – 303 permitted
under 18/01142/APP to 8 flats and three houses pending consideration
alongside this application. 
21/01350/APP – Remix of 12 flats to 8 flats and two houses, and erection of 16
flats on site of consented student accommodation site (19/00615/APP) pending
consideration alongside this application. 
21/01801/APP – Remix of 20 flats to 10 flats and two detached houses pending
consideration alongside this application. 
21/01821/APP – Revised design and layout of 16 flats pending consideration
alongside this application. 
Phase 3 
18/01142/APP – Planning permission for 316 residential units refused by the
Planning and Regulatory Services Committee at their meeting of 8 October
2019 and decision notice issued on 16 October 2019. Subsequent appeal to
the Planning and Environmental Appeals Division (Scottish Ministers) allowed
subject to signing of legal agreement to secure development obligations.
Decision issued following signing of legal agreement on 2 July 2020. 
19/01184/APP – Installation of SuDS basin adjacent approved by the Planning
and Regulatory Services Committee at their meeting of 25 February 2020 and
decision notice issued on 28 February 2020. 
19/00615/APP – Erection of student residences (6 flats with 42 bed spaces)
with associated parking and landscaping granted planning permission was
given a willingness to approve by the Planning and Regulatory Services
Committee at their meeting of 8 October 2019 subject to signing of legal
agreement to secure developer obligations. Legal agreement was subsequently
signed and decision issued on 14 July 2020. 
17/00970/PAN – Proposal of Application Notice (PAN) for residential
development and associated infrastructure incorporating the balance of Forres
R3 Ferrylea and Forres LONG 3. This PAN was presented to the Planning and
Regulatory Services Committee on 15 August 2017. Feedback was given by
the Committee on a number of matters that should be taken into account. 
Phase 2 
16/00743/APP – 120 residential units with associated infrastructure granted
planning permission on 28 April 2017 following decision of Planning and
Regulatory Services Committee meeting of 6 December 2016 to grant consent
subject to conditions and legal agreement. 
15/01861/PAN – PAN for residential development on part of R3 Ferrylea,
Forres. This PAN was reported to the Planning and Regulatory Services
Committee on 1 December 2015. Feedback was given by the Committee on
access arrangements. 
Page 250

Page 251

Phase 1 
12/01110/APP – Erection of 129 residential units and community facilities
(dental practice, retail units) with associated infrastructure and landscaping, as
well as masterplan covering the remaining balance of site R3 (up to 380 units)
granted planning consent by Planning and Regulatory Services Committee of
18 December 2012 subject to conditions and legal agreement. 
15/01923/APP – Application for a partial reconfiguration of the site granted
under 12/01110/APP increasing number of units on part of site from 5 to 10
units granted planning consent by Planning and Regulatory Services
Committee of 23 February 2016 subject to conditions. 
10/00048/PAN – Proposal of Application Notice for housing development and
community facilities. 
Phases 1 & 2 - Several applications to vary house types across the consented
phases have been approved. 
4. POLICY - SEE APPENDIX 
5. ADVERTISEMENTS 
5.1 Advertised as a departure from the development plan. 
6. CONSULTATIONS 
Transportation Manager – No objections subject to conditions in relation to
car and cycle parking and EV charging. 
Strategic Planning and Delivery – Quality audit not required due to nature of
amendments proposed, following amendments and clarification, proposal
complies with relevant policies of the Moray Local Development Plan 2020. 
Environmental Health – No objections. 
Contaminated Land – No objections. 
Scottish Water – No objections, sufficient capacity for foul (Forres Waste
Water Treatment Works) and water (Glenlatterach Water Treatment Works)
connections. 
Moray Flood Risk Management – No objections. 
Developer Obligations – Revised developer obligations assessment for wider
development approved under 18/01142/APP in light of amendments proposed
under this and other remix applications. Obligations sought towards:
   Transport – public transport and Orchard Road/Thornhill Road junction
improvement);
Page 251

Page 252

   Healthcare – extension to Forres Health Centre, 2 additional dental chairs
and reconfiguration of pharmacy outlets; and
   Sports and Recreation – 3G pitch in Forres. 
Housing – Condition must be applied to ensure 25% affordable housing
provision and 10% accessible housing in private units is provided across the
site permitted under 18/01142/APP. 
7. OBJECTIONS-REPRESENTATIONS 
None 
8. OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. the adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. The main issues are considered below: 
8.2 Principle
The general principle of residential development on this site is established via
the extant consent in place in addition to its designation as a residential
development site in the MLDP. Consideration therefore lies with the suitability
of the proposal in terms of design, siting and servicing arrangements (parking,
drainage, etc.). 
8.3 Design and Siting
Policy PP1 requires new development of 10 or more units to be subject to the
quality audit process, however given this proposal involves the revision of a
small part of a consented development, and there is no change to the street
layout, open space, landscaping, play area, SuDS, etc. in the wider
development, there is limited scope to apply the quality audit process to this
application. Nonetheless the requirements of policies PP1 and DP1 must still
be considered. 
8.3.1 The application was advertised as a departure from the development plan on
the basis it did not comply with policies DP1 and PP1, though following
amendments the proposal is no longer considered to be a departure from the
development plan. 
8.3.2 The layout of the wider development in which this proposal sits will remain
largely unchanged, with housing to the south and east remaining as consented.
The flats would see a decrease in units compared to that already consented (8
to 6). They would share parking with the flats to the south (proposed under
application 21/01350/APP). Sufficient parking has been provided between both,
along with open space, which ensures an appropriate balance of development.
The houses proposed occupy a sweeping corner, offering a public frontage to
this section of the development. Though plot 445 is on a corner, an area of
landscape planting between the road and the house means there is no need for
a side window to ensure a dual aspect house that house “turns the corner” as
Page 252

Page 253

required under policy DP1 (for natural surveillance, which is offered by other
units nearby). 
8.3.3 The houses are all “house types” that have been used elsewhere on the wider
site permitted under 18/01142/APP, though the flats are a new type
(Moray/Dunbar) that has not been permitted within this designation. They are
similar to flats found in Elgin, and the overall style of development is in keeping
with the common identity established by the applicant’s housebuilding style on
this site and elsewhere in the region. Under 18/01142/APP the site was split
into different character areas, whereby the use of varying external material
finishes to the buildings, landscaping and surfacing materials allowed the
development to have a mix in finishes to offer a degree of variety and legibility
to the housing development. This proposal has proposed a slight difference to
the material finishes, but a condition will be applied to ensure material finishes
match those of the established character areas under the original consent. 
8.3.4 The position of the houses and flats subject to this application do not give rise
to any amenity issues in terms of significant adverse overlooking,
overshadowing and loss of light to neighbouring house plots. 
8.3.5 The proposed car parking arrangement for the flats and houses has allowed for
the 50% requirement of parking to the side and rear of the building line under
policy PP1. This reduces the dominance of parked cars on the street scene
compared with extant consent. The communal parking for flats is broken up by
planting to ensure parking provision is broken up at an interval of every 4
spaces with shrub planting. 
8.3.6 Sufficient landscaping has been proposed, with hedge boundary treatment on
front gardens where they have a road frontage and trees within the
development. The species are suitable for the character areas established
under 18/01142/APP. 
8.3.7 Overall, the design and siting of the proposal is considered to comply with
policies PP1 and DP1. 
8.4 Biodiversity
Under policy EP2, new development proposal of four or more houses must
ensure they safeguard and enhance biodiversity. In this case a biodiversity
statement provided with the application has identified that landscaping, along
with bat and bird boxes will be provided in order to enhance biodiversity.
Subject to condition ensuring the specific location for these measures is
identified (as part of the wider landscaping proposals) and given the scale and
type of development (remixing a consented scheme), the proposed biodiversity
measures are considered to be acceptable in terms of policy EP2. 
8.5 Parking and Access
The proposed parking arrangement is considered suitable, with the
Transportation Manager raising no objections to this proposal, subject to
conditions ensuring electric vehicle charging infrastructure can be
accommodated within the development, cycle parking is provided for flats and
ensuring parking provision is maintained at the numbers proposed. Subject to
Page 253

Page 254

these conditions, the proposal is considered to comply with the requirements of
policies PP3 and DP1 in respect of parking and access. 
8.6 Drainage and Water
Existing drainage arrangements consented under application 18/01142/APP
will be amended to accommodate the revised proposal subject to this
application. Moray Flood Risk Management have raised no objections to the
proposal in regards to design. 
8.7 Developer Obligations
In light of the revisions to this application along with other amendments
proposed (see History), an updated developer obligations assessment has
been undertaken for the site. The developer has agreed to the heads of terms
of these obligations and following determination of this consent (and the
others), the legal agreement will be varied to take account of these
amendments. Subject to this being undertaken the proposal complies with
policy PP3. 
8.8 Affordable and Accessible Housing
The revisions proposed have impacted on the provision of affordable housing.
The extant consent provides 25% affordable housing, and policy DP2 requires
25% to be provided on any housing development of four or more units. In light
of the amendments proposed there is a net increase in 3 units as a result of this
proposal. The Housing Manager has not objected to this application but has
recommended the proposal be subject to a condition ensuring affordable
housing is provided at a rate of 25% across phase 3 (covered under application
18/01142/APP and the student accommodation site (19/00615/APP)). 
8.8.1 Plans provided with this and all other applications pending consideration show
25% affordable housing will be provided. The application with affordable
housing shown (21/01350/APP) will be conditioned to ensure its provision and
secure 25% on site provision of affordable housing, though as no affordable
housing is shown as part of this remix application a condition is not necessary
for this consent. 
8.8.2 Accessible housing figures will see an increase of four ground floor flats
provided as part of the wider development of phase 3, however this number will
have to be considered as part of the other remixes proposed. Nonetheless, the
overall provision of accessible housing exceeds 10% under the original phase 3
consent 18/01142/APP (22.7%). 
8.8.3 Taking account of the above considerations there is no conflict with policy DP2. 
Conclusion and Recommendation
The proposed remix comprises a suitable form of development in terms of
siting, design, layout, and can be served by suitable infrastructure (either
existing or proposed as part of this proposal or the original consent for the
housing development). It therefore complies with relevant policies of the MLDP.
Approval is therefore recommended subject to conditions, but consent should
be held until the developer has entered into a varied legal agreement of that in
place under planning permission 18/01142/APP to secure developer
obligations. 
Page 254

Page 255

REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal complies with the Moray Local Development Plan 2020 and there
are no material considerations that indicate otherwise. 
Author/Contact
Officer:
Andrew Miller            
Senior Planning Officer
Ext: 01343 563274 
Beverly Smith
Development Management & Building Standards Manager
Page 255

Page 256

Page 256

Page 257

APPENDIX 
POLICY 
Moray Local Development Plan 2020 
PP1 PLACEMAKING 
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(i) Character and Identity
• Create places that are distinctive to prevent homogenous 'anywhere'
development;
• Provide a number of character areas reflecting site characteristics that
have their own distinctive identity and are clearly distinguishable;
• Provide distinctiveness between and in each character area through a
combination of measures including variation in urban form, street
structure/network, architecture and masonry, accent features (such as
porches), surrounds and detailing, materials (buildings and surfaces),
colour, boundary treatments, hard/soft landscaping and a variety of
approaches to tree species and planting that emphasises the hierarchy of
open spaces and streets within a cohesive design strategy for the whole
development;
• Distinctiveness must be reinforced along main thoroughfares, open
spaces and places where people may congregate such as
shopping/service centres;
• Retain, incorporate and/or respond to relevant elements of the landscape
such as topography and planted features, natural and historic
environment, and propose street naming (in residential developments of
20 units and above, where proposed names are to be submitted with the
planning application) to retain and enhance local associations; 
Page 257

Page 258

(ii) Healthier, Safer Environments
• Designed to prevent crime, fear of crime and anti-social behaviour with
good levels of natural surveillance and security using treatments such as
low boundary walls, dual frontages (principal rooms) and well-lit routes to
encourage social interaction.  Unbroken high boundary treatments such
as wooden fencing and blank gables onto routes, open spaces and
communal areas will not be acceptable.
• Designed to encourage physical exercise for people of all abilities.
• Create a distinctive urban form with landmarks, key buildings, vistas,
gateways and public art to provide good orientation and navigation
through the development.
• Provide a mix of compatible uses, where indicated within settlement
statements, integrated into the fabric of buildings within the street.
• Prioritise pedestrians and cyclists by providing a permeable movement
framework that incorporates desire lines (including connecting to and
upgrading existing desire lines) and is fully integrated with the surrounding
network to create walkable neighbourhoods and encourage physical
activity.
• Integrate multi- functional active travel routes, green and open space into
layout and design, to create well connected places that encourage
physical activity, provide attractive spaces for people to interact and to
connect with nature.
• Create safe streets that influence driver behaviour to reduce vehicle
speeds that are appropriate to the local context such as through shorter
streets, reduced visibility and varying the building line.
• Provide seating opportunities within streets, paths and open spaces for all
generations and mobility's to interact, participate in activity, and rest and
reflect.
• Provide for people with mobility problems or a disability to access
buildings, places and open spaces.
• Create development with public fronts and private backs. 
• Maximise environmental benefits through the orientation of buildings,
streets and open space to maximise the health benefits associated with
solar gain and wind shelter. 
(iii) Housing Mix
• Provide a wide range of well integrated tenures, including a range of
house types and plot sizes for different household sizes, incomes and
generations and meet the affordable and accessible requirements of
policy DP2 Housing.
• All tenures of housing should have equal access to amenities, greenspace
and active travel routes. 
(iv) Open Spaces/Landscaping
• Provide accessible, multi-functional open space within a clearly defined
hierarchy integrated into the development and connected via an active
travel network of  green/blue corridors that are fully incorporated into the
development and to the surrounding area, and meet the requirements of
policy EP5 Open Space and the Open Space Strategy Supplementary
Guidance and Policy EP12 Managing the Water Environment and
Drainage Impact Assessment for New Developments Supplementary
Guidance.
Page 258

Page 259

• Landscaped areas must provide seasonal variation, (mix of planting and
colour) including native planting for pollination and food production.
• Landscaping areas that because of their size, shape or location would not
form any useable space or that will not positively contribute to the
character of an area will not contribute to the open space requirements of
Policy EP4 Open Space.
• Semi-mature tree planting and shrubs must be provided along all routes
with the variety of approaches reflecting and accentuating the street
hierarchy.
• Public and private space must be clearly defined.
• Play areas (where identified) must be inclusive, providing equipment so
the facility is for every child/young person regardless of ability and
provided upon completion of 50% of the character area.
• Proposals must provide advance landscaping identified in site
designations and meet the quality requirements of policy EP5 Open
Space.
• Structural landscaping must incorporate countryside style paths (such as
bound or compacted gravel) with waymarkers.
•  Maintenance arrangements for all paths, trees, hedging, shrubs, play/
sports areas, roundabouts and other open/ green spaces and blue/green
corridors must be provided. 
v) Biodiversity
• Create a variety of high quality multi- functional green/blue spaces and
networks that connect people and nature, that include trees, hedges and
planting to enhance biodiversity and support habitats/wildlife and comply
with policy EP2 Biodiversity and Geodiversity and EP5 Open Space.
• A plan detailing how different elements of the development will contribute
to supporting biodiversity must be included in the design statement
submitted with the planning application.
• Integrate green and blue infrastructure such as swales, permeable paving,
SUDS ponds, green roofs and walls and grass/wildflower verges into
streets, parking areas and plots to sustainably address drainage and
flooding issues and enhance biodiversity from the outset of the
development.
• Developments must safeguard and where physically possible extend or
enhance wildlife corridors and green/blue networks and prevent
fragmentation of existing habitats. 
(vi) Parking
• Car parking must not dominate the streetscape to the front or rear of
properties.  On all streets a minimum of 50% of car parking must be
provided to the side or rear and behind the building line with a maximum
of 50% car parking within the front curtilage or on street, subject to the
visual impact being mitigated by hedging, low stone boundary walls or
other acceptable treatments that enhance the streetscape.
• Provide semi-mature trees and planting within communal private and
public/visitor parking areas and on-street parking at a maximum interval of
4 car parking spaces.
• Secure and covered cycle parking and storage, car sharing spaces and
electric car charging points must be provided in accordance with policy
DP1 Development Principles.
Page 259

Page 260

• Parking areas must use a variation in materials to reduce the visual
impact on the streetscene. 
(vii) Street Layout and Detail
• Provide a clear hierarchy of streets reinforced through street width,
building density and street and building design, materials, hard/soft
landscaping and a variety of approaches to tree planting and shrubs.
• Streets and connecting routes should encourage walking and cycling over
use of the private car by providing well connected, safe and appealing
routes.
• Design junctions to prioritise pedestrians, accommodate active travel and
public transport and service/emergency vehicles to reflect the context and
urban form and ensure that the street pattern is not standardised.  
• Dead-end streets/cul-de-sacs will only be selectively permitted such as on
rural edges or where topography, site size, shape or relationship to
adjacent developments prevent an alternative more permeable layout.
These must be short, serving no more than 10 units and provide walking
and cycling through routes to maximise connectivity to the surrounding
area.
• Where a roundabout forms a gateway into, or a landmark within, a town
and/or a development, it must be designed to create a gateway feature or
to contribute positively to the character of the area.
• Design principles for street layouts must be informed by a Street
Engineering Review (SER) and align with Roads Construction Consent
(RCC) to provide certainty that the development will be delivered as per
the planning consent. 
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan.¬¬¬ 
(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space. 
Page 260

Page 261

ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS. 
ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use. 
Page 261

Page 262

b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours 
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations 
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment. 
Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
Page 262

Page 263

the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
Page 263

Page 264

f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. 
Alterations and extensions must be compatible with the character of the
existing building in terms of design, form, choice of materials and positioning
and meet all other relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
Page 264

Page 265

e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2. 
f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
Page 265

Page 266

g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry. 
h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
DP2 HOUSING
a) Proposals for development on all designated and windfall housing sites must include
a design statement and shall include supporting information regarding the
comprehensive layout and development of the whole site, addressing infrastructure,
access for pedestrians, cyclists, public transport and service vehicles, landscaping,
drainage, affordable and accessible housing and other matters as may be required
by the planning authority, unless these requirements are not specified in the site
designation or are considered not to be required. 
Proposals must comply with Policy PP1, DP1, the site development requirements
within the settlement plans, all other relevant policies within the Plan and must
comply with the following requirements; 
b) Piecemeal/ individual plot development proposals 
Piecemeal and individual/ plot development proposals will only be acceptable where
details for the comprehensive redevelopment of the site are provided to the
satisfaction of the planning authority and proposals comply with the terms of Policy
DP1, other relevant policies including access, affordable and accessible housing,
landscaping and open space and where appropriate key design principles and site
designation requirements are met. 
Proposals for piecemeal/ plot development must be accompanied by a Delivery Plan
setting out how the comprehensive development of the site will be achieved.              
c) Housing density 
Capacity figures indicated within site designations are indicative only. Proposed
capacities will be considered through the Quality Auditing process against the
characteristics of the site, character of the surrounding area, conformity with all
policies and the requirements of good Placemaking as set out in Policies PP1 and
DP1. 
d) Affordable Housing 
Proposals for all housing developments (including conversions) must provide a
contribution towards the provision of affordable housing. 
Proposals for new housing developments of 4 or more units (including conversions)
must provide 25% of the total units as affordable housing in  affordable tenures to be
agreed by the Housing Strategy and Development Manager. For proposals of less
than 4 market housing units a commuted payment will be required towards meeting
housing needs in the local housing market area. 
A higher percentage contribution will be considered subject to funding availability, as
informed by the Local Housing Strategy. A lesser contribution or alternative in the
form of off-site provision or a commuted payment will only be considered where
exceptional site development costs or other project viability issues are demonstrated
and agreed by the Housing Strategy and Development Manager and the Strategic
Planning and Development Manager. Intermediate tenures will be considered in
Page 266

Page 267

accordance with the HNDA and Local Housing Strategy, and agreed with the
Housing Strategy and Development Manager. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 40. 
e) Housing Mix and Tenure Integration   
Proposals must demonstrate tenure integration and meet the following criteria; 
• Architectural style and external finishes must ensure that homes are tenure
blind 
• The spatial mix must ensure communities are integrated to share school
catchment areas, open spaces, play areas, sports areas, bus stops and other
community facilities. 
f) Accessible Housing 
Housing proposals of 10 or more units incorporating affordable housing will be
required to provide 10% of the private sector units to wheelchair accessible standard.
Flexibility may be applied on sites where topography would be particularly
challenging for wheelchair users. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 41. 
POLICY GUIDANCE NOTE- AFFORDABLE AND ACCESSIBLE HOUSING
Affordable Housing
Providing affordable housing is a key priority for Moray Council and this is reflected in the
Local Outcomes Improvement Plan (LOIP) and the Local Housing Strategy (LHS). The
Council's Housing Need and Demand Assessment 2017 highlights the significant
requirement for affordable housing in Moray, which is a national issue, resulting from  a
number of factors including affordability issues, downturn in the economy and the
shortage of public and private sector rented houses. 
Planning policies assist with the provision of affordable housing, which is defined in
Scottish Planning Policy (SPP) as; 
"housing of a reasonable quality that is affordable to people on modest incomes.
Affordable housing may be provided in the form of social rented accommodation, mid-
market rented accommodation, shared ownership housing, shared equity housing,
housing sold at a discount (including plots for self -build and low cost housing without
subsidy." This local development plan regards lower quartile earnings as "modest
incomes". 
The 2017 HNDA identified a requirement for 56% of all need and demand to be affordable
units in Moray between 2017 and 2035. This Local Development Plan has lowered the
threshold so that individual house proposals are required to make a contribution towards
affordable housing provision, which is intended to ensure proposals do not circumnavigate
the policy and provide a fair and transparent process. 
Page 267

Page 268

A number of variables influence affordability of housing, including mortgage deposit
requirements, mortgage interest rates, lower quartile house prices, lower quartile private
rents, lower quartile full time gross earnings. Changes in these variables will affect the
affordability of housing in Moray. The maximum affordable rent and maximum affordable
house purchase prices is published on the Council's website at
http://www.moray.gov.uk/moray_standard/page_90100.html. The current Local Housing
Allowance will be used as a proxy for average private sector rents.
Affordable housing should be provided on site and as part of a mixed development of
private and affordable units. To meet the need for affordable housing there may be
proposals for 100% provision of affordable housing and these will be acceptable as part of
a wider mixed community, provided all other  Local Development Plan policies are met. 
The policy requires single house proposals to make a commuted sum payment as a
developer obligation towards affordable housing, with the cost figure published annually
on the Council website at http://www.moray.gov.uk/moray_standard/page_94665.html and
determined by the District Valuer's assessment of the value of serviced land for affordable
housing in Moray. This allows developers to be clear at the outset of a project about the
potential cost of commuted payments and should be reflected in land values. 
The type of affordable housing to be provided will be determined by the Housing and
Property service. Developers should contact Housing and Property as early as possible.
Housing and Property will decide whether a commuted payment or affordable units will be
required on a site by site basis.   Housing and Property will provide developers with an
affordable housing mix, detailing the size and type of housing required based on
HNDA/LHS requirements. 
The Council will consider the following categories of affordable housing within the context
of the needs identified in the HNDA/ LHS;
• Social rented accommodation- housing provided by an affordable rent managed by a
Registered Social Landlord such as a housing association or another body regulated
by the Scottish Housing Regulator, including Moray Council.
• Mid-market rent accommodation- housing with rents set at a level higher than purely
social rent, but lower than market rent levels and affordable by households in
housing need. Mid-market rent housing can be provided by the private and social
housing sectors.
• Shared equity housing- sales to low income households, administered through a
Scottish Government scheme e.g. Low-cost initiative for First Time Buyers (LIFT). 
Any proposals to provide affordable housing in a form other than those listed above, must
demonstrate that the cost to the householder is "affordable" in the Moray context and that
the property will remain "affordable" in perpetuity. 
Affordable housing requirement figures will be rounded up. 
The Strategic Housing Investment Plan (SHIP) is produced annually by the Council and
identifies details of the proposed delivery of affordable housing. 
Accessible housing
Scottish Planning Policy states (para 28) that "the aim is to achieve the right development
in the right place; it is not to allow development at any cost" and "that policies and
decisions should be……supporting delivery of accessible housing."
Policy DP2 aims to;
Page 268

Page 269

• Assist the Council, the NHS and the Health and Social Care Moray to meet the
challenges presented by our ageing population and the shared aim of helping people
to live well at home or in a homely setting. The HNDA 2017 demonstrates that
Moray's population is ageing and there is a trend towards older and smaller
households. 
• Provide increased choice of tenure to people with physical disabilities or mobility
impairments, by increasing the supply of accessible housing in the private sector.
There is currently a mismatch between the size and type of housing required and the
size and type of housing available across all tenures. This mismatch, along with
increasing housing needs associated with physical disability, are the likely drivers of
owner occupiers seeking public sector accessible housing to meet medical needs. 
Accessible/ adapted housing can promote independence and wellbeing for older or
disabled people, can facilitate self- care, informal care and unpaid care, potentially prevent
falls and hospital admissions and can delay entry into residential care. 
Policy DP2 requires that housing proposals of 10 or more units incorporating affordable
housingmust provide 10% of the private sector units to wheelchair accessible standard
where all the rooms are accessible to a wheelchair user. 
This applies to new build and conversion/ redevelopment projects. Flexibility may apply
where there is extremely challenging topography or where the site is in a remote location.
For the purposes of Policy DP2, "remote" locations are defined as being rural areas
outside settlement and Rural Grouping boundaries as defined in the Local Development
Plan. 
Accessible units should be in a location which provides convenient access, in terms of
distance, gradient and available public transport, to reach the facilities needed for
independent living. Small, low maintenance gardens are generally regarded as a positive
feature by this customer group. 
New wheelchair accessible housing in any tenure must comply with Housing for Varying
Needs Standards (HfVNs), including the standards specific to dwellings for wheelchair
users. HfVNs is available at
http://webarchive.nationalarchives.gov.uk/20131205115152uo_/http://www.archive2.officia
l-documents.co.uk/document/deps/cs/HousingOutput/start.htm 
The specific design specification required to meet the terms of this policy are;
External requirements
• location(s) convenient for amenities and facilities e.g. public transport, local shops
etc
• car parking space as close as possible to the entrance door and at a maximum
distance of 15m (HfVNs para 7.13.4 refers).
• Step free paths within curtilage, ramp gradients preferably of 1:20 but no steeper
than 1:12 (HfVNs para 7.7.1 refers) 
Internal requirements
• Hallways- minimum 1200mm wide (HfVNs para 10.2.3 refers)
• Door frames- minimum 926mm wide door leaf, giving a clear width of 870mm (HfVNs
para 10.5.7 refers)
Page 269

Page 270

• Bathrooms/ wet rooms- 1500mm wheelchair turning circle required (HfVNs para
14.9.2 refers) 
Accessible housing requirement figures will be rounded down. 
All proposals for new build or converted housing should set out details of how they will
comply with this policy in their planning application. 
EP2 BIODIVERSITY
All development proposals must, where possible, retain, protect and enhance features of
biological interest and provide for their appropriate management.  Development must
safeguard and where physically possible extend or enhance wildlife corridors and
green/blue networks and prevent fragmentation of existing habitats. 
Development should integrate measures to enhance biodiversity as part of multi-functional
spaces/ routes. 
Proposals for 4 or more housing units or 1000 m2 or more of commercial floorspace must
create new or, where appropriate, enhance natural habitats of ecological and amenity
value. 
Developers must demonstrate, through a Placemaking Statement where required by
Policy PP1 which incorporates a Biodiversity Plan, that they have included biodiversity
features in the design of the development. Habitat creation can be achieved by providing
links into existing green and blue networks, wildlife friendly features such as wildflower
verges and meadows, bird and bat boxes, amphibian friendly kerbing, wildlife crossing
points such as hedgehog highways and planting to encourage pollination, wildlife friendly
climbing plants, use of hedges rather than fences, incorporating biodiversity measures into
SUDS and retaining some standing or lying dead wood, allotments, orchards and
woodlands. 
Where development would result in loss of natural habitats of ecological amenity value,
compensatory habitat creation will be required where deemed appropriate. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application. 
Level 1 -  a flood statement with basic information with regard to flood risk.
Page 270

Page 271

Level 2 -  full flood risk assessment providing details of flood risk from all sources,
results of hydrological and hydraulic studies and any appropriate
proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood risk
will be required and any loss of flood storage capacity mitigated to achieve a neutral
or better outcome. Water resistant materials and construction must be used where
Page 271

Page 272

appropriate. Land raising and elevated buildings on structures such as stilts are
unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
Page 272

Page 273

presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side)
(top of bank) 
Less than 1m  6m
1-5m  6-12m
5-15m  12-20m
15m+   20m+ 
The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP13 FOUL DRAINAGE 
All development within or close to settlements (as defined in the Local Development Plan)
of more than 2,000 population must connect to the public sewerage system unless
connection  is not permitted due to lack of capacity. In such circumstances, temporary
provision of private sewerage systems may be allowed provided Scottish Water has
confirmed investment to address this constraint has been allocated within its investment
Programme and the following requirements have been met; 
• Systems must not have an adverse effect on the water environment
• Systems must be designed and built to a standard which will allow adoption by
Scottish Water
• Systems must be designed such that they can be easily connected to a public sewer
in the future. Typically this will mean providing a drainage line up to a likely point of
connection. 
All development within or close to settlements (as above) of less than 2,000 population will
require to connect to public sewerage except where a compelling case is made otherwise.
Factors to be considered in such a case will include size of the proposed development,
whether the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Page 273

Page 274

Where a compelling case is made, a private system may be acceptable provided it does
not pose or add a risk of detrimental effects, including cumulative, to the natural and built
environment, surrounding uses or amenity of the general area. 
Where a private system is deemed to be acceptable, within settlements as above or small
scale development in the countryside, a discharge to land, either full soakaway or raised
mound soakaway, compatible with Technical Handbooks (which sets out guidance on how
proposals may meet the Building  Regulations) must be explored prior to considering a
discharge to surface waters. 
EP14 POLLUTION, CONTAMINATION & HAZARDS
a)  Pollution
Development proposals which may cause significant air, water, soil, light or noise
pollution or exacerbate existing issues must be accompanied by a detailed
assessment report on the levels, character and transmission of the potential pollution
with measures to mitigate impacts. Where significant or unacceptable impacts
cannot be mitigated, proposals will be refused.   
b) Contamination
Development proposals on potentially contaminated land will be approved where
they comply with other relevant policies and; 
i) The applicant can demonstrate through site investigations and risk assessment,
that the site is in a condition suitable for the proposed development and is not
causing significant pollution of the environment; and
ii) Where necessary, effective remediation measures are agreed to ensure the
site is made suitable for the new use and to ensure appropriate disposal and/ or
treatment of any hazardous material. 
c) Hazardous sites
Development proposals must avoid and not impact upon hazardous sites or result in
public safety concerns due to proximity or use in the vicinity of hazardous sites. 
R2 Ferrylea  22.2ha  380 units 
• Phases 1 and 2 of development has commenced with 249 units consented.
• A masterplan is required, incorporating land at West Park Croft, showing connections
between all areas, proposed landscaping, the required affordable and accessible
housing and required buffer to the gas pipeline.
• Lowering of density onto the rural edge required.
• Pocket park within south eastern part of site required.
• Transport Assessment required.
• Junction improvements required within Forres, scale to be determined through the
Transport Assessment.
• Widening of Mannachie Road along frontage of site to 6m and provision of a 3m
wide cycle path to the west side connecting to the north and completing any missing
sections between the site and the existing network to the north required.
• Contribution required towards path widening along Mannachie Road to 3m wide from
development to core path FR22 (including provision for a crossing).
• Widening of Mannachie Road to 5.5m from Link Road access, south to access to
West Park Croft and safeguarding for future widening within site boundary beyond
this is required. 
Page 274

Page 275

• Assessment for additional bus stop infrastructure within the frontage of the
development must be considered as part of the overall R2/R4/R6 bus stop
infrastructure provision and accessibility to bus stops. 
• A developer contribution towards public transport will be sought.
• Path links must be provided to the woodland to the south of the site, and north into
adjacent housing at Mannachie Brae.
• Flood Risk Assessment (FRA) required.
• Drainage Impact Assessment (DIA) required.
• Phase 1 Habitat Survey required.
• Archaeological targeted evaluation (10%) of known features and monitored topsoil
strip of all remaining areas required.
Page 275

Page 276

Page 276

Page 277

WARD 08_17 
21/01801/APP
18th November 2021
Substitution of house types on Plots 455-466 Phase 3 (as
per application 18/01142/APP) at R2 Ferrylea Forres
Moray 
for Springfield Properties PLC 
Comments: 
 The proposal has previously been reported to Committee and the appointed
officer considers that significant implications of this proposal in conjunction with
18/01142/APP have been made for Committee to reconsider the development.
 The application was advertised for neighbour notification purposes. 
 No objections received. 
Procedure: 
 If members are minded to approve as per the recommendation, then a
modification of the existing legal agreement attached to planning permission ref
18/01142/APP (as permitted under appeal decision notice PPA-300-2057) is
required prior to issue of planning consent. 
Recommendation Grant planning permission subject to conditions: 
Conditions/Reasons 
1. The development hereby granted planning permission forms part of, and is related
to, a development granted planning permission under formal planning appeal
decision notice PPA-300-2057 by the Planning and Environmental Appeals
Division, Scottish Government dated 2 July 2020 wherein:
a.   the terms and conditions as attached to the permission granted under that
decision notice are hereby re-iterated and remain in force in so far as they
relate to the development hereby approved, namely conditions 1, 4, 5, 17-20,
including any details already approved thereunder to discharge the
requirements of those conditions; and
b.   no part of the development as hereby granted shall be exercised in
conjunction with, or in addition to, the building design and plot layout details
already approved for plots 136 – 155 (now identified under this permission
as plots 455 – 466). 
Reason: To ensure a satisfactory form of development and that it progresses in
accordance with the already approved and required details, and that only one
permission is implemented on plots 136 – 155 (now identified as plots 455 – 466). 
Item 11
Page 277

Page 278

2. Prior to any development commencing and notwithstanding the details shown on
the approved plans, a scheme of external material finishes of the houses and flats
that match those of consented neighbouring plots shall be submitted to and
approved in writing by the Council, as Planning Authority. Thereafter the
development shall be implemented in accordance with the approved details. 
Reason: To ensure suitable material finishes to each plot, in the interests of the
character of the development in which the house plots sit. 
3. Notwithstanding the details shown for Plots 445-458 and 461-466 (which are not
accepted) no development shall commence until details (Location and Design
plans) have been submitted for approval by the Planning Authority in consultation
with the Roads Authority showing the provision of secure cycle parking facilities at
a rate of not less than 1 space per flat. Thereafter the cycle parking shall be
provided prior to completion of the associated flats and retained and maintained
for that purpose unless otherwise agree in writing by the Planning Authority in
consultation with the Roads Authority. 
Reason: In the interests of an acceptable form of development and the provision
of cycle parking infrastructure to support the use of low carbon transport, through
the provision of details currently lacking. 
4. Notwithstanding the details submitted. No development works shall commence
until a detailed drawing (scale 1:200) has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority confirming the provision of, or location where future Electric Vehicle (EV)
charging unit(s) can be connected to an appropriate electricity supply, including
details (written proposals and/or plans) to confirm the provision of the necessary
cabling, ducting, and consumer units capable of supporting the future charging
unit and infrastructure; and thereafter the EV charging infrastructure shall be
provided in accordance with the approved drawing and details prior to the
completion of the dwelling house. 
Reason: In the interests of an acceptable form of development and the provision
of infrastructure to support the use of low carbon transport, through the provision
of details currently lacking. 
5. Parking provision for houses shall be provided at the following rates:
   1 Bedroom = 1 space
   2 -3 Bedrooms = 2 spaces
   4 or more bedrooms = 3 spaces 
Parking shall be provided prior to the completion of each house which it is
associated with and thereafter retained and available for that purpose unless
otherwise agreed in writing by the Planning Authority in consultation with the
Roads Authority. 
Reason: To ensure the permanent availability of the level of parking necessary for
residents/visitors/others in the interests of an acceptable development and road
safety.  
Page 278

Page 279

6. No boundary fences, hedges, walls or any other obstruction whatsoever over
0.6m in height and fronting onto the public road shall be within 2.4m of the edge of
the carriageway. 
Reason: To enable drivers of vehicles entering or exiting the site to have a clear
view so that they can undertake the manoeuvre safely and with the minimum
interference to the safety and free flow of traffic on the public road. 
7. The landscaping as shown in drawing numbers MO01-1_Remix_SL_53 hereby
approved shall be provided by no later than the first planting season after
completion or first occupation (whichever is the soonest) of the respective house
plot/block of flats to which the landscaping relates. Any trees, shrubs and hedge
plantings which within a period of 5 years from planting die, are removed or
become seriously damaged or diseased shall be replaced in the following planting
season with others of similar size, number and spacing unless the Planning
Authority gives written consent to any variation of this condition. 
Reason: In order to ensure that the approved landscaping works are timeously
carried out and properly maintained in a manner which will not adversely affect the
amenity, appearance, character and quality of the development and the
surrounding area. 
8. No development shall commence until a scheme for the provision of a communal
bin storage area for flatted properties in the development has been submitted to
and approved in writing by the Planning Authority. Thereafter, no flats shall be
brought into use unless they are served by the bin storage facilities as approved
under this condition for their respective block. 
Reason: In order to ensure the flatted properties are served by suitable recycling
and refuse facilities. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal does not provide 50% of parking provision to the site or rear of the plots
proposed, contrary to policies DP1 and PP1 of the Moray Local Development Plan
2020. However the proposal is considered to provide an improved layout to that already
consented for the site, being of a lower density, providing enhanced landscaping and
open space and is therefore considered to be an acceptable departure from these
policies. The proposal complies with the Moray Local Development Plan 2020 in all
other respects and there are no material considerations that indicate otherwise.   
Page 279

Page 280

List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
This decision notice must be read in conjunction with the terms of the planning
obligation that has been entered into in respect of this development under Section
75 of the Town and Country Planning (Scotland) Act 1997 (as amended). The
agreement is available for inspection on the Moray Council online planning
register. 
A Building Warrant will be required for the proposals.  Should you require further
assistance please do not hesitate to contact Building Standards, Environmental
Services Department, Council Office, High Street, ELGIN IV30 1BX or by
telephoning 0300 1234561. 
The TRANSPORTATION MANAGER has commented that:- 
Before commencing development, the applicant is obliged to apply for
Construction Consent in accordance with Section 21 of the Roads (Scotland) Act
1984 for new roads. The implications for the proposed changes on any existing
Roads Construction Consent must be addressed. The applicant will be required to
provide technical information, including drawings and drainage calculations, and
provide a Road Bond to cover the full value of the works in accordance with the
Security for Private Road Works (Scotland) 1985 Regulations. Advice on this
matter can be obtained from the Moray Council web site or by emailing
transport.develop@moray.gov.uk 
The provision of Electric Vehicle (EV) chargers and/or associated infrastructure
shall be provided in accordance with Moray Council guidelines. Cabling between
charging units and parking spaces must not cross or obstruct the public road
including footways. Infrastructure provided to enable EV charging must be
retained for this purpose for the lifetime of the development unless otherwise
agreed in writing by the Planning Authority.   Guidance on Electric Vehicle (EV)
Charging requirements can be found at:
http://www.moray.gov.uk/downloads/file134860.pdf 
Public utility apparatus may be affected by this proposal.  Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
Page 280

Page 281

LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
1224DTAS-901 H Arden house type
1287DT STOCk-901  Balerno house type
652-757STOCK-901  Auldearn house type
932CT CF 901  Moray and Dunbar house type
MO01-1_REMIX_LP_52 Site layout
MO01-1_REMIX_LP_53 Landscaping layout
MO01-1_REMIX_LP_54 Material conditions
MO01-1_REMIX_LP_55 EV charging locations
MO01-1_REMIX_LP_55-1 EV charging locations
MO01-1_REMIX_LP_55-2 EV charging locations
MO01-1_REMIX_LP_06 Location plan
MO01-1_Remix_S_01  Section Plots 459 & 460 
MO01-1_REMIX_01 E House type allocation 
Documents to be approved:
 Ecological Statement
 Drainage Statement 
Page 281

Page 282

Page 282

Page 283

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
R2 Ferrylea
Forres
Planning Application Ref Number: 
21/01801/APP
Location Plan
Applicant Name: 
Springfield Properties PLC
Page 283

Page 284

Site Location
Page 284

Page 285

Site Layout
Page 285

Page 286

Arden house type
Page 286

Page 287

Auldearn house type
Page 287

Page 288

Balerno house type
Page 288

Page 289

16/01664/APP
Page 289

Page 290

Photo 1
16/
Page 290

Page 291

Photo 2
Page 291

Page 292

Page 292

Page 293

PLANNING APPLICATION: 21/01801/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1. THE PROPOSAL 
   Remix of 20 consented flats to form 10 flats and 2 detached houses within
a consented housing development at Ferrylea, Forres (currently marketed
by the applicant as “Knockomie Braes”).
   One block of flats would be a Moray & Dunbar type, comprising a two
storey block of 6 flats with associated parking. Ground floor flats would
have a patio and first floor flats would have balconies. There would be
solar panels on the roof of the flats.
   The other block of flats would be an Auldearn type, comprising a two
storey block of 4 flats, with associated parking.
   The detached houses would be served by private driveways.
   All units proposed under this application would be private. 
2. THE SITE 
   House plots within a consented housing development. The area of ground
subject to this application is yet to be developed, with the earlier phases to
the north either completed or under construction.
   The surrounding plots comprise a mix of detached and semi-detached
houses and flats (in two storey blocks of four), with a mix of private and
affordable housing. 
3. HISTORY 
The designation in which the site sits has been subject to three phases of
development on residential designation R2 – Ferrylea, Forres in the Moray
Local Development Plan 2020 (previously R3 in Moray Local Development Plan
2015 and Moray Local Development Plan 2008). Phases 1 and 2 are complete
and phase 3 is underway and a number of houses are now occupied. 
Five applications on phase 3 pending consideration alongside this
application: 
21/00941/APP – Revised design of three detached houses on plots 257-259
permitted under 18/01142/APP. Willingness to approve under delegated
powers subject to varied legal agreement. 
Page 293

Page 294

21/01217/APP – Remix of 8 houses on plots 267, 296 and 298 – 303 permitted
under 18/01142/APP to 8 flats and three houses pending consideration
alongside this application. 
21/01350/APP – Remix of 12 flats to 8 flats and two houses, and erection of 16
flats on site of consented student accommodation site (19/00615/APP) pending
consideration alongside this application. 
21/01717/APP – Remix of 12 flats and one detached house to eight flats, two
detached and two semi-detached houses pending consideration alongside this
application. 
21/01821/APP – Revised design and layout of 16 flats pending consideration
alongside this application. 
Phase 3 
18/01142/APP – Planning permission for 316 residential units refused by the
Planning and Regulatory Services Committee at their meeting of 8 October
2019 and decision notice issued on 16 October 2019. Subsequent appeal to
the Planning and Environmental Appeals Division (Scottish Ministers) allowed
subject to signing of legal agreement to secure development obligations.
Decision issued following signing of legal agreement on 2 July 2020. 
19/01184/APP – Installation of SuDS basin adjacent approved by the Planning
and Regulatory Services Committee at their meeting of 25 February 2020 and
decision notice issued on 28 February 2020. 
19/00615/APP – Erection of student residences (6 flats with 42 bed spaces)
with associated parking and landscaping granted planning permission was
given a willingness to approve by the Planning and Regulatory Services
Committee at their meeting of 8 October 2019 subject to signing of legal
agreement to secure developer obligations. Legal agreement was subsequently
signed and decision issued on 14 July 2020. 
17/00970/PAN – Proposal of Application Notice (PAN) for residential
development and associated infrastructure incorporating the balance of Forres
R3 Ferrylea and Forres LONG 3. This PAN was presented to the Planning and
Regulatory Services Committee on 15 August 2017. Feedback was given by
the Committee on a number of matters that should be taken into account. 
Phase 2 
16/00743/APP – 120 residential units with associated infrastructure granted
planning permission on 28 April 2017 following decision of Planning and
Regulatory Services Committee meeting of 6 December 2016 to grant consent
subject to conditions and legal agreement. 
15/01861/PAN – PAN for residential development on part of R3 Ferrylea,
Forres. This PAN was reported to the Planning and Regulatory Services
Committee on 1 December 2015. Feedback was given by the Committee on
access arrangements. 
Page 294

Page 295

Phase 1 
12/01110/APP – Erection of 129 residential units and community facilities
(dental practice, retail units) with associated infrastructure and landscaping, as
well as masterplan covering the remaining balance of site R3 (up to 380 units)
granted planning consent by Planning and Regulatory Services Committee of
18 December 2012 subject to conditions and legal agreement. 
15/01923/APP – Application for a partial reconfiguration of the site granted
under 12/01110/APP increasing number of units on part of site from 5 to 10
units granted planning consent by Planning and Regulatory Services
Committee of 23 February 2016 subject to conditions. 
10/00048/PAN – Proposal of Application Notice for housing development and
community facilities. 
Phases 1 & 2 - Several applications to vary house types across the consented
phases have been approved. 
4. POLICY - SEE APPENDIX 
5. ADVERTISEMENTS 
5.1 Advertised for neighbour notification purposes. 
6. CONSULTATIONS 
Transportation Manager – No objections subject to conditions in relation to
car and cycle parking and EV charging. 
Strategic Planning and Delivery – Quality audit not required due to nature of
amendments proposed within a consented housing scheme. Proposal is
contrary to policies DP1 and PP1 of the Moray Local Development Plan 2020. 
Environmental Health – No objections. 
Contaminated Land – No objections. 
Scottish Water – No objections, sufficient capacity for foul (Forres Waste
Water Treatment Works) and water (Glenlatterach Water Treatment Works)
connections. 
Moray Flood Risk Management – No objections. 
Developer Obligations – Revised developer obligations assessment for wider
development approved under 18/01142/APP in light of amendments proposed
under this and other remix applications. Obligations sought towards:
Page 295

Page 296

   Transport – public transport and Orchard Road/Thornhill Road junction
improvement;
   Healthcare – extension to Forres Health Centre, 2 additional dental chairs
and reconfiguration of pharmacy outlets; and
   Sports and Recreation – 3G pitch in Forres. 
Housing – Condition must be applied to ensure 25% affordable housing
provision and 10% accessible housing in private units is provided across the
site permitted under 18/01142/APP. 
7. OBJECTIONS-REPRESENTATIONS 
None 
8. OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. the adopted Moray Local
Development Plan 2020 (MLDP) unless material considerations indicate
otherwise. The main issues are considered below: 
8.2 Principle
The general principle of residential development on this site is established via
the extant consent in place in addition to its designation as a residential
development site in the MLDP. Consideration therefore lies with the suitability
of the proposal in terms of design, siting and servicing arrangements (parking,
drainage, etc.). 
8.3 Design and Siting
Policy PP1 requires new development of 10 or more units to be subject to the
quality audit process, however given this proposal involves the revision of a
small part of a consented development, and there is no change to the street
layout, open space, landscaping, play area, SuDS, etc. in the wider
development, there is limited scope to apply the quality audit process to this
application. Nonetheless the requirements of policies PP1 and DP1 must still
be considered. 
8.3.1 The area subject to this application has 5 four unit blocks of flats (20 in total)
permitted around a sweeping corner, with parking directly to the street. The
proposal would see this reduced, with 10 flats and 2 detached houses
proposed instead. This overall lower density increases open space provision in
the area, whilst reducing the extent of parking in this section of the
development. Whilst the parking arrangement is not fully in accordance with
policies DP1 and PP1 (which requires more than 50% of parking to be to the
side and rear of houses/flats), this layout is considered to represent an
improved layout over that consented with an appropriate balance of built form,
parking and open space. It is noted that the context of the site is such that
many plots do not meet the 50% parking requirements to side and rear of plots
given this was not a planning requirement when originally permitted.
Landscaping proposed will aid in screening the presence of parking, with
Page 296

Page 297

spaces broken up at an interval of 4 or less by landscape buffers (in line with
PP1). In light of the foregoing, the proposal is considered to be an acceptable
departure from policies DP1 and PP1. 
8.3.2 The houses and flats themselves are all “house types” that have been used
elsewhere on the wider site permitted under 18/01142/APP. These are
therefore in keeping with the common identity established by the applicant’s
housebuilding style on this site and elsewhere in the region. Under
18/01142/APP the site was split into different character areas, whereby the use
of varying external material finishes to the buildings, landscaping and surfacing
materials allowed the development to have a mix in finishes to offer a degree of
variety and legibility to the housing development. This proposal has proposed a
slight difference to the material finishes, but a condition will be applied to
ensure material finishes match those of the established character areas under
the original consent. 
8.3.3 The position of the houses and flats subject to this application do not give rise
to any amenity issues in terms of significant adverse overlooking,
overshadowing and loss of light to neighbouring house plots. 
8.3.4 Sufficient landscaping has been proposed, with tree planting through the areas
of open space around this section of development. The species are suitable for
the character areas established under 18/01142/APP. 
8.3.5 Overall, the design and siting of the proposal is considered to comply with
policies PP1 and DP1. 
8.4 Biodiversity
Under policy EP2, new development proposal of four or more houses must
ensure they safeguard and enhance biodiversity. In this case a biodiversity
statement provided with the application has identified that landscaping, along
with bat and bird boxes will be provided in order to enhance biodiversity.
Subject to condition ensuring the specific location for these measures is
identified (as part of the wider landscaping proposals) and given the scale and
type of development (remixing a consented scheme), the proposed biodiversity
measures are considered to be acceptable in terms of policy EP2. 
8.5 Parking and Access
The proposed parking arrangement is considered suitable, with the
Transportation Manager raising no objections to this proposal, subject to
conditions ensuring electric vehicle charging infrastructure can be
accommodated within the development, cycle parking is provided for flats and
ensuring parking provision is maintained at the numbers proposed. Subject to
these conditions, the proposal is considered to comply with the requirements of
policies PP3 and DP1 in respect of parking and access. 
8.6 Drainage and Water
Existing drainage arrangements consented under application 18/01142/APP
will be amended to accommodate the revised proposal subject to this
application. Moray Flood Risk Management have raised no objections to the
proposal in regards to design 
Page 297

Page 298

8.7  Developer Obligations
In light of the revisions to this application along with other amendments
proposed (see History), an updated developer obligations assessment has
been undertaken for the site. The developer has agreed to the heads of terms
of these obligations and following determination of this consent (and the
others), the legal agreement will be varied to take account of these
amendments. Subject to this being undertaken the proposal complies with
policy PP3. 
8.8 Affordable and Accessible Housing
The revisions proposed have impacted on the provision of affordable housing.
The extant consent provides 25% affordable housing, and policy DP2 requires
25% to be provided on any housing development of four or more units. In light
of the amendments proposed there is a net increase in 3 units as a result of this
proposal. The Housing Manager has not objected to this application but has
recommended the proposal be subject to a condition ensuring affordable
housing is provided at a rate of 25% across phase 3 (covered under application
18/01142/APP and the student accommodation site (19/00615/APP)). 
8.8.1 Plans provided with this and all other applications pending consideration show
25% affordable housing will be provided. The application with affordable
housing shown (21/01350/APP) will be conditioned to ensure its provision and
secure 25% on site provision of affordable housing, though as no affordable
housing is shown as part of this remix application a condition is not necessary
for this consent. 
8.8.2 Accessible housing figures will see an increase of four ground floor flats
provided as part of the wider development of phase 3, however this number will
have to be considered as part of the other remixes proposed. Nonetheless, the
overall provision of accessible housing exceeds 10% under the original phase 3
consent 18/01142/APP (22.7%). 
8.8.3 Taking account of the above considerations there is no conflict with policy DP2. 
Conclusion and Recommendation
The proposed remix comprises a suitable form of development in terms of
siting, design, layout, and can be served by suitable infrastructure (either
existing or proposed as part of this proposal or the original consent for the
housing development). Although the parking arrangement is not fully compliant
with policies DP1 and PP1, it is an acceptable departure from these policies in
light of the context of the site, within a consented scheme and represents an
improved layout over that already consented for this site. Approval is therefore
recommended subject to conditions, but consent should be held until the
developer has entered into a varied legal agreement of that in place under
planning permission 18/01142/APP to secure developer obligations. 
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal does not provide 50% of parking provision to the site or rear of
the plots proposed, contrary to policies DP1 and PP1 of the Moray Local
Development Plan 2020. However the proposal is considered to provide an
Page 298

Page 299

improved layout to that already consented for the site, being of a lower density,
providing enhanced landscaping and open space and is therefore considered to
be an acceptable departure from these policies. The proposal complies with the
Moray Local Development Plan 2020 in all other respects and there are no
material considerations that indicate otherwise. 
Author/Contact
Officer:
Andrew Miller            
Senior Planning Officer
Ext: 01343 563274 
Beverly Smith
Development Management & Building Standards Manager
Page 299

Page 300

Page 300

Page 301

APPENDIX 
POLICY 
Moray Local Development Plan 2020 
PP1 PLACEMAKING 
a) Development must be designed to create successful, healthy places that support
good physical and mental health, help reduce health inequalities, improve people's
wellbeing, safeguard the environment and support economic development.   
b) A Placemaking Statement is required for residential developments of 10 units and
above to be submitted with the planning application to articulate how the
development proposal addresses the requirements of policy PP1 Placemaking and
other relevant LDP policies and guidance.  The Placemaking Statement must include
sufficient information for the council to carry out a Quality Audit.  Where considered
appropriate by the council, taking account of the nature and scale of the proposed
development and of the site circumstances, this shall include a landscaping plan, a
topographical survey, slope analysis, site sections, 3D visualisations, a Street
Engineering Review and a Biodiversity Plan.  The Placemaking Statement must
demonstrate how the development promotes opportunities for healthy living and
working. The landscape plan must set out details of species type, size, timescales for
planting and maintenance. 
c) To create successful, healthy places residential developments of 10 units and above
must comply with Scottish Government policy Creating Places and Designing Streets
and must incorporate the following fundamental principles: 
(d) Future masterplans will be prepared through collaborative working and in partnership
between the developer and the council for Lochyhill (Forres), Barhill Road (Buckie),
Elgin Town Centre/Cooper Park, Elgin North East, Clarkly Hill, Burghead and West
Mosstodloch.  Masterplans that are not prepared collaboratively and in partnership
with the council will not be supported.  Masterplans that are approved will be
Supplementary Guidance to the Plan.¬¬¬ 
(e) Proposals for sites must reflect the key design principles and safeguard or enhance
the green networks set out in the Proposals Maps and Settlement Statements. 
Alternative design solutions may be proposed where justification is provided to the
planning authority's satisfaction to merit this. 
PP3  INFRASTRUCTURE & SERVICES
Development must be planned and co-ordinated with infrastructure to ensure that places
function properly and proposals are adequately served by infrastructure and services.   
a) In relation to infrastructure and services developments will be required to provide the
following as may be considered appropriate by the planning authority, unless these
requirements are considered not to be necessary: 
i)  Education, Health, Transport, Sports and Recreation and Access facilities in
accord with Supplementary Guidance on Developer Obligations and Open
Space.
Page 301

Page 302

ii)  Green infrastructure and network requirements specified in policy EP5 Open
Space, Town and Village Maps and, contained within Supplementary Guidance
on the Open Space Strategy, Masterplans and Development Briefs. 
iii)  Mitigation/modification to the existing transport network (including road and rail)
to address the impact of the proposed development in terms of safety and
efficiency.  This may include but not be limited to passing places, road
widening, junction enhancement, bus stop infrastructure, and drainage
infrastructure.  A number of potential road and transport improvements are
identified and shown on the Town and Village Maps as Transport Proposals
(TSP's) including the interventions in the Elgin Transport Strategy. These
requirements are not exhaustive and do not pre-empt any measures which may
result from the Transport Assessment process. 
iv)  Electric car charging points must be provided at all commercial and community
parking facilities.  Access to charging points must also be provided for
residential properties, where in-curtilage facilities cannot be provided to any
individual residential property then access to communal charging facilities
should be made available.  Access to other nearby charging facilities will be
taken into consideration when identifying the need for communal electric
charging points. 
v)  Active Travel and Core Path requirements specified in the Council's Active
Travel Strategy and Core Path Plan. 
vi)  Safe transport and access routes linking to existing networks and mitigating the
impacts of development off-site. 
vii)  Information Communication Technology (ICT) and fibre optic broadband
connections for all premises unless justification is provided to substantiate it is
technically unfeasible. 
viii)  Foul and surface water drainage, including Sustainable Urban Drainage
Systems (SUDS), including construction phase SUDS. 
ix)  Measures that implement the waste management hierarchy as defined in the
Zero Waste Plan for Scotland including the provision of local waste storage and
recycling facilities designed into the development in accord with policy PP1
Placemaking.  For major applications a site waste management plan may be
required to ensure that waste minimisation is achieved during the construction
phase. 
x)  Infrastructure required to improve or increase capacity at Water Treatment
Works and Waste Water Treatment Works will be supported subject to
compliance with policy DP1. 
xi) A utilities plan setting out how existing and new utility (including gas, water,
electricity pipelines and pylons) provision has been incorporated into the layout
and design of the proposal.  This requirement may be exempted in relation to
developments where the council considers it might not be appropriate, such as
domestic or very small scale built developments and some changes of use.
Page 302

Page 303

b)  Development proposals will not be supported where they:
i)  Create new accesses onto trunk roads and other main/key routes (A941 & A98)
unless significant economic benefits are demonstrated or such access is
required to facilitate development that supports the provisions of the
development plan. 
ii)  Adversely impact on active travel routes, core paths, rights of way, long
distance and other access routes and cannot be adequately mitigated by an
equivalent or better alternative provision in a location convenient for users. 
iii)  Adversely impact on blue/green infrastructure, including green networks
important for wildlife unless an equivalent or better alternative provision will be
provided. 
iv)  Are incompatible with key waste sites at Dallachy, Gollanfield, Moycroft and
Waterford and would prejudice their operation. 
v)  Adversely impact on community and recreational sites, buildings or
infrastructure including CF designations and cannot be adequately mitigated. 
vi)  Adversely impact on flood alleviation and mitigation infrastructure. 
vii)  Compromise the economic viability of bus or rail facilities.   
c)  Harbours 
Development within and diversification of harbours to support their sustainable
operation will be supported subject to compliance with other policies and settlement
statements. 
d)  Developer Obligations 
Developer obligations will be sought to mitigate any measurable adverse impact of a
development proposal on local infrastructure, including education, healthcare,
transport (including rail), sports and recreational facilities and access routes. 
Obligations will be sought to reduce, eliminate or compensate for this impact.
Developer obligations may also be sought to mitigate any adverse impacts of a
development, alone or cumulatively with other developments in the area, on the
natural environment. 
Where necessary obligations that can be secured satisfactorily by means of a
planning condition attached to planning permission will be done this way.  Where this
cannot be achieved, the required obligation will be secured through a planning
agreement in accordance with Circular 3/2012 on Planning Obligations.   
Developer obligations will be sought in accordance with the Council's Supplementary
Guidance on Developer Obligations.  This sets out the anticipated infrastructure
requirements, including methodology and rates.   
Where a developer considers that the application of developer obligations renders a
development commercially unviable a viability assessment and 'open-book
accounting' must be provided by the developer which Moray Council, via the District
Valuer, will verify, at the developer's expense.  Should this be deemed accurate then
Page 303

Page 304

the Council will enter into negotiation with the developer to determine a viable level
of developer obligations.   
The Council's Developer Obligations Supplementary Guidance provides further detail
to support this policy. 
DP1 DEVELOPMENT PRINCIPLES 
This policy applies to all development, including extensions and conversions and will be
applied reasonably taking into account the nature and scale of a proposal and individual
circumstances. 
The Council will require applicants to provide impact assessments in order to determine
the impact of a proposal. Applicants may be asked to determine the impacts upon the
environment, transport network, town centres, noise, air quality, landscape, trees, flood
risk, protected habitats and species, contaminated land, built heritage and archaeology
and provide mitigation to address these impacts. 
Development proposals will be supported if they conform to the relevant Local
Development Plan policies, proposals and additional guidance, meet the following criteria
and address their individual and cumulative impacts: 
(i) Design
a) The scale, density and character must be appropriate to the surrounding area
and create a sense of place (see Policy PP1) and support the principles of a
walkable neighbourhood. 
b) The development must be integrated into the surrounding landscape which will
include safeguarding existing trees and undertaking replacement planting to
include native trees for any existing trees that are felled, and safeguarding any
notable topographical features (e.g. distinctive knolls), stone walls and existing
water features by avoiding channel modifications and culverting. A tree survey
and tree protection plan must be provided with planning applications for all
proposals where mature trees are present on site or that may impact on trees
outwith the site. The strategy for new tree provision should follow the principles
of the "Right Tree in the Right Place". 
c) Make provision for new open space and connect to existing open space under
the requirements of Policy EP5 and provide details of the future maintenance of
these spaces. A detailed landscape plan must be submitted with planning
applications and include information about green/blue infrastructure, tree
species, planting, ground/soil conditions, and natural and man-made features
(e.g. grass areas, wildflower verges, fencing, walls, paths, etc.). 
d) Demonstrate how the development will conserve and enhance the natural and
built environment and cultural heritage resources, retain original land contours
and integrate into the landscape. 
e) Proposals must not adversely impact upon neighbouring properties in terms of
privacy, daylight or overbearing loss of amenity. 
Page 304

Page 305

f)  Proposals do not result in backland development or plots that are subdivided by
more than 50% of the original plot.  Sub-divided plots must be a minimum of
400m2, excluding access and the built-up area of the application site will not
exceed one-third of the total area of the plot and the resultant plot density and
layout reflects the character of the surrounding area. 
g)  Pitched roofs will be preferred to flat roofs and box dormers are not acceptable. 
h)  Existing stone walls on buildings and boundaries must be retained. 
Alterations and extensions must be compatible with the character of the
existing building in terms of design, form, choice of materials and positioning
and meet all other relevant criteria of this policy. 
i)  Proposals must orientate and design buildings to maximise opportunities for
solar gain. 
j)  All developments must be designed so as to ensure that all new buildings avoid
a specified and rising proportion of the projected greenhouse gas emissions
from their use (calculated on the basis of the approved design and plans for the
specific development) through the installation and operation of low and zero-
carbon generating technologies. 
(ii) Transportation
a) Proposals must provide safe entry and exit from the development, including the
appropriate number and type of junctions, maximise connections and routes for
pedestrians and cyclists, including links to active travel and core path routes,
reduce travel demands and ensure appropriate visibility for all road users at
junctions and bends. Road, cycling, footpath and public transport connections
and infrastructure must be provided at a level appropriate to the development
and connect people to education, employment, recreation, health, community
and retail facilities. 
b) Car parking must not dominate the street scene and must be provided to the
side or rear ¬and behind the building line. Maximum (50%) parking to the front
of buildings and on street may be permitted provided that the visual impact of
the parked cars is mitigated by hedging or low stone boundary walls. Roadways
with a single carriageway must provide sufficient off road parking to avoid
access routes being blocked to larger service vehicles and prevent parking on
pavements. 
c) Provide safe access to and from the road network, address any impacts on
road safety and the local road, rail and public transport network. Any impacts
identified through Transport Assessments/ Statements must be identified and
mitigated. This may include but would not be limited to, passing places, road
widening, junction improvements, bus stop infrastructure and drainage
infrastructure. A number of potential mitigation measures have been identified
in association with the development of sites and the most significant are shown
on the Proposals Map as TSP's. 
d) Provide covered and secure facilities for cycle parking at all flats/apartments,
retail, community, education, health and employment centres. 
Page 305

Page 306

e) Garages and parking provision must be designed to comply with Moray Council
parking specifications see Appendix 2. 
f)  The road layout must be designed to allow for the efficient mechanical
sweeping of all roadways and channels, paviors, turning areas and junctions.
The road layout must also be designed to enable safe working practices,
minimising reversing of service vehicles, with hammerheads minimised in
preference to turning areas such as road stubs or hatchets, and to provide
adequate space for the collection of waste and movement of waste collection
vehicles. 
g) The road and house layout in urban development should allow for communal
refuse collection points where the design does not allow for individual storage
within the curtilage and / or collections at kerbside. Communal collection points
may either be for the temporary storage of containers taken by the individual
householder or for the permanent storage of larger containers. The
requirements for a communal storage area are stated within the Council's
Kerbside Collection Policy, which will be a material consideration. 
h) Road signs should be minimised designed and placed at the back of footpaths
to reduce street clutter, avoid obstructing pedestrian movements and
safeguarding sightlines; 
i)  Within communal parking areas there will be a requirement for electric car
charging points. Parking spaces for car sharing must be provided where a need
is identified by the Transportation Manager. 
(iii) Water environment, pollution, contamination
a) Acceptable water and drainage provision must be made, including the use of
sustainable urban drainage systems (SUDS) for dealing with surface water
including temporary/ construction phase SUDS (see Policy EP12). 
b) New development should not be located in areas at flood risk or increase
vulnerability to flooding (see Policy EP12). Exceptions to this would only be
considered in specific circumstances, e.g. extension to an existing building or
change of use to an equal or less vulnerable use. Where this exception is
applied the proposed development must include resilience measures such as
raised floor levels and electrical sockets. 
c) Proposals must avoid major hazard sites and address any potential risk of
pollution including ground water contamination in accordance with recognised
pollution prevention and control measures. 
d) Proposals must protect and wherever practicable enhance water features
through for example naturalisation of watercourses by introducing a more
natural planform and removing redundant or unnecessary structures. 
e) Proposals must address and sufficiently mitigate any contaminated land issues. 
f)  Make acceptable arrangements for waste collection and management and
encourage recycling. 
Page 306

Page 307

g) Avoid sterilising significant workable reserves of minerals, prime agricultural
land or productive forestry. 
h)  Proposals must avoid areas at risk of coastal erosion and coastal change. 
DP2 HOUSING
a) Proposals for development on all designated and windfall housing sites must include
a design statement and shall include supporting information regarding the
comprehensive layout and development of the whole site, addressing infrastructure,
access for pedestrians, cyclists, public transport and service vehicles, landscaping,
drainage, affordable and accessible housing and other matters as may be required
by the planning authority, unless these requirements are not specified in the site
designation or are considered not to be required. 
Proposals must comply with Policy PP1, DP1, the site development requirements
within the settlement plans, all other relevant policies within the Plan and must
comply with the following requirements; 
b) Piecemeal/ individual plot development proposals 
Piecemeal and individual/ plot development proposals will only be acceptable where
details for the comprehensive redevelopment of the site are provided to the
satisfaction of the planning authority and proposals comply with the terms of Policy
DP1, other relevant policies including access, affordable and accessible housing,
landscaping and open space and where appropriate key design principles and site
designation requirements are met. 
Proposals for piecemeal/ plot development must be accompanied by a Delivery Plan
setting out how the comprehensive development of the site will be achieved.              
c) Housing density 
Capacity figures indicated within site designations are indicative only. Proposed
capacities will be considered through the Quality Auditing process against the
characteristics of the site, character of the surrounding area, conformity with all
policies and the requirements of good Placemaking as set out in Policies PP1 and
DP1. 
d) Affordable Housing 
Proposals for all housing developments (including conversions) must provide a
contribution towards the provision of affordable housing. 
Proposals for new housing developments of 4 or more units (including conversions)
must provide 25% of the total units as affordable housing in  affordable tenures to be
agreed by the Housing Strategy and Development Manager. For proposals of less
than 4 market housing units a commuted payment will be required towards meeting
housing needs in the local housing market area. 
A higher percentage contribution will be considered subject to funding availability, as
informed by the Local Housing Strategy. A lesser contribution or alternative in the
form of off-site provision or a commuted payment will only be considered where
exceptional site development costs or other project viability issues are demonstrated
and agreed by the Housing Strategy and Development Manager and the Strategic
Planning and Development Manager. Intermediate tenures will be considered in
Page 307

Page 308

accordance with the HNDA and Local Housing Strategy, and agreed with the
Housing Strategy and Development Manager. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 40. 
e) Housing Mix and Tenure Integration   
Proposals must demonstrate tenure integration and meet the following criteria; 
• Architectural style and external finishes must ensure that homes are tenure
blind 
• The spatial mix must ensure communities are integrated to share school
catchment areas, open spaces, play areas, sports areas, bus stops and other
community facilities. 
f) Accessible Housing 
Housing proposals of 10 or more units incorporating affordable housing will be
required to provide 10% of the private sector units to wheelchair accessible standard.
Flexibility may be applied on sites where topography would be particularly
challenging for wheelchair users. 
Further detail on the implementation of this policy is provided in the Policy Guidance
note on page 41. 
POLICY GUIDANCE NOTE- AFFORDABLE AND ACCESSIBLE HOUSING
Affordable Housing
Providing affordable housing is a key priority for Moray Council and this is reflected in the
Local Outcomes Improvement Plan (LOIP) and the Local Housing Strategy (LHS). The
Council's Housing Need and Demand Assessment 2017 highlights the significant
requirement for affordable housing in Moray, which is a national issue, resulting from  a
number of factors including affordability issues, downturn in the economy and the
shortage of public and private sector rented houses. 
Planning policies assist with the provision of affordable housing, which is defined in
Scottish Planning Policy (SPP) as; 
"housing of a reasonable quality that is affordable to people on modest incomes.
Affordable housing may be provided in the form of social rented accommodation, mid-
market rented accommodation, shared ownership housing, shared equity housing,
housing sold at a discount (including plots for self -build and low cost housing without
subsidy." This local development plan regards lower quartile earnings as "modest
incomes". 
The 2017 HNDA identified a requirement for 56% of all need and demand to be affordable
units in Moray between 2017 and 2035. This Local Development Plan has lowered the
threshold so that individual house proposals are required to make a contribution towards
affordable housing provision, which is intended to ensure proposals do not circumnavigate
the policy and provide a fair and transparent process. 
Page 308

Page 309

A number of variables influence affordability of housing, including mortgage deposit
requirements, mortgage interest rates, lower quartile house prices, lower quartile private
rents, lower quartile full time gross earnings. Changes in these variables will affect the
affordability of housing in Moray. The maximum affordable rent and maximum affordable
house purchase prices is published on the Council's website at
http://www.moray.gov.uk/moray_standard/page_90100.html. The current Local Housing
Allowance will be used as a proxy for average private sector rents.
Affordable housing should be provided on site and as part of a mixed development of
private and affordable units. To meet the need for affordable housing there may be
proposals for 100% provision of affordable housing and these will be acceptable as part of
a wider mixed community, provided all other  Local Development Plan policies are met. 
The policy requires single house proposals to make a commuted sum payment as a
developer obligation towards affordable housing, with the cost figure published annually
on the Council website at http://www.moray.gov.uk/moray_standard/page_94665.html and
determined by the District Valuer's assessment of the value of serviced land for affordable
housing in Moray. This allows developers to be clear at the outset of a project about the
potential cost of commuted payments and should be reflected in land values. 
The type of affordable housing to be provided will be determined by the Housing and
Property service. Developers should contact Housing and Property as early as possible.
Housing and Property will decide whether a commuted payment or affordable units will be
required on a site by site basis.   Housing and Property will provide developers with an
affordable housing mix, detailing the size and type of housing required based on
HNDA/LHS requirements. 
The Council will consider the following categories of affordable housing within the context
of the needs identified in the HNDA/ LHS;
• Social rented accommodation- housing provided by an affordable rent managed by a
Registered Social Landlord such as a housing association or another body regulated
by the Scottish Housing Regulator, including Moray Council.
• Mid-market rent accommodation- housing with rents set at a level higher than purely
social rent, but lower than market rent levels and affordable by households in
housing need. Mid-market rent housing can be provided by the private and social
housing sectors.
• Shared equity housing- sales to low income households, administered through a
Scottish Government scheme e.g. Low-cost initiative for First Time Buyers (LIFT). 
Any proposals to provide affordable housing in a form other than those listed above, must
demonstrate that the cost to the householder is "affordable" in the Moray context and that
the property will remain "affordable" in perpetuity. 
Affordable housing requirement figures will be rounded up. 
The Strategic Housing Investment Plan (SHIP) is produced annually by the Council and
identifies details of the proposed delivery of affordable housing. 
Accessible housing
Scottish Planning Policy states (para 28) that "the aim is to achieve the right development
in the right place; it is not to allow development at any cost" and "that policies and
decisions should be……supporting delivery of accessible housing."
Policy DP2 aims to;
Page 309

Page 310

• Assist the Council, the NHS and the Health and Social Care Moray to meet the
challenges presented by our ageing population and the shared aim of helping people
to live well at home or in a homely setting. The HNDA 2017 demonstrates that
Moray's population is ageing and there is a trend towards older and smaller
households. 
• Provide increased choice of tenure to people with physical disabilities or mobility
impairments, by increasing the supply of accessible housing in the private sector.
There is currently a mismatch between the size and type of housing required and the
size and type of housing available across all tenures. This mismatch, along with
increasing housing needs associated with physical disability, are the likely drivers of
owner occupiers seeking public sector accessible housing to meet medical needs. 
Accessible/ adapted housing can promote independence and wellbeing for older or
disabled people, can facilitate self- care, informal care and unpaid care, potentially prevent
falls and hospital admissions and can delay entry into residential care. 
Policy DP2 requires that housing proposals of 10 or more units incorporating affordable
housingmust provide 10% of the private sector units to wheelchair accessible standard
where all the rooms are accessible to a wheelchair user. 
This applies to new build and conversion/ redevelopment projects. Flexibility may apply
where there is extremely challenging topography or where the site is in a remote location.
For the purposes of Policy DP2, "remote" locations are defined as being rural areas
outside settlement and Rural Grouping boundaries as defined in the Local Development
Plan. 
Accessible units should be in a location which provides convenient access, in terms of
distance, gradient and available public transport, to reach the facilities needed for
independent living. Small, low maintenance gardens are generally regarded as a positive
feature by this customer group. 
New wheelchair accessible housing in any tenure must comply with Housing for Varying
Needs Standards (HfVNs), including the standards specific to dwellings for wheelchair
users. HfVNs is available at
http://webarchive.nationalarchives.gov.uk/20131205115152uo_/http://www.archive2.officia
l-documents.co.uk/document/deps/cs/HousingOutput/start.htm 
The specific design specification required to meet the terms of this policy are;
External requirements
• location(s) convenient for amenities and facilities e.g. public transport, local shops
etc
• car parking space as close as possible to the entrance door and at a maximum
distance of 15m (HfVNs para 7.13.4 refers).
• Step free paths within curtilage, ramp gradients preferably of 1:20 but no steeper
than 1:12 (HfVNs para 7.7.1 refers) 
Internal requirements
• Hallways- minimum 1200mm wide (HfVNs para 10.2.3 refers)
• Door frames- minimum 926mm wide door leaf, giving a clear width of 870mm (HfVNs
para 10.5.7 refers)
Page 310

Page 311

• Bathrooms/ wet rooms- 1500mm wheelchair turning circle required (HfVNs para
14.9.2 refers) 
Accessible housing requirement figures will be rounded down. 
All proposals for new build or converted housing should set out details of how they will
comply with this policy in their planning application. 
EP2 BIODIVERSITY
All development proposals must, where possible, retain, protect and enhance features of
biological interest and provide for their appropriate management.  Development must
safeguard and where physically possible extend or enhance wildlife corridors and
green/blue networks and prevent fragmentation of existing habitats. 
Development should integrate measures to enhance biodiversity as part of multi-functional
spaces/ routes. 
Proposals for 4 or more housing units or 1000 m2 or more of commercial floorspace must
create new or, where appropriate, enhance natural habitats of ecological and amenity
value. 
Developers must demonstrate, through a Placemaking Statement where required by
Policy PP1 which incorporates a Biodiversity Plan, that they have included biodiversity
features in the design of the development. Habitat creation can be achieved by providing
links into existing green and blue networks, wildlife friendly features such as wildflower
verges and meadows, bird and bat boxes, amphibian friendly kerbing, wildlife crossing
points such as hedgehog highways and planting to encourage pollination, wildlife friendly
climbing plants, use of hedges rather than fences, incorporating biodiversity measures into
SUDS and retaining some standing or lying dead wood, allotments, orchards and
woodlands. 
Where development would result in loss of natural habitats of ecological amenity value,
compensatory habitat creation will be required where deemed appropriate. 
EP12 MANAGEMENT AND ENHANCEMENT OF THE WATER ENVIRONMENT
a) Flooding
New development will not be supported if it would be at significant risk of flooding
from any source or would materially increase the possibility of flooding elsewhere.
For development at or near coastal locations, this includes consideration of future
flooding that may be caused by sea level rise and/or coastal change eroding existing
natural defences in the medium and long term. 
Proposals for development in areas considered to be at risk from flooding will only be
permitted where a flood risk assessment to comply with the recommendations of
Scottish Planning Policy and to the satisfaction of Scottish Environment Protection
Agency and the Council is provided by the applicant. 
There are different levels of flood risk assessment dependent on the nature of the
flood risk. The level of assessment should be discussed with the Council prior to
submitting a planning application. 
Level 1 -  a flood statement with basic information with regard to flood risk.
Page 311

Page 312

Level 2 -  full flood risk assessment providing details of flood risk from all sources,
results of hydrological and hydraulic studies and any appropriate
proposed mitigation. 
Assessments must demonstrate that the development is not at risk of flooding and
would not increase the probability of flooding elsewhere.  Level 2 flood risk
assessments must be signed off by a competent professional.  The Flood Risk
Assessment and Drainage Impact Assessment for New Development Supplementary
Guidance provides further detail on the information required. 
Due to continuing changes in climatic patterns, the precautionary principle will apply
when reviewing any application for an area at risk from inundation by floodwater.
Proposed development in coastal areas must consider the impact of tidal events and
wave action when assessing potential flood risk. 
The following limitations on development will also be applied to take account of the
degree of flooding as defined in Scottish Planning Policy;
a) In areas of little to no risk (less than 0.1%), there will be no general constraint to
development.
b) Areas of low to medium risk (0.1% to 0.5%) will be considered suitable for most
development. A flood risk assessment may be required at the upper end of the
probability range i.e. (close to 0.5%) and for essential civil infrastructure and the
most vulnerable uses. Water resistant materials and construction may be
required. Areas within this risk category will generally not be suitable for civil
infrastructure. Where civil infrastructure must be located in these areas or is
being substantially extended, it should be designed to be capable of remaining
operational and accessible during flooding events.
c) Areas of medium to high risk (0.5% or above) may be suitable for:
• Residential, institutional, commercial and industrial development within
built up areas provided that flood protection measures to the appropriate
standard already exist and are maintained, are under construction, or are
a planned measure in a current flood management plan.
• Essential infrastructure within built up areas, designed and constructed to
remain operational during floods and not impede water flow.
• Some recreational, sport, amenity and nature conservation uses, provided
appropriate evacuation procedures are in place, and
• Employment related accommodation e.g. caretakers or operational staff. 
Areas within these risk categories will generally not be suitable for the following
uses and where an alternative/lower risk location is not available¬¬;
• Civil infrastructure and most vulnerable uses.
• Additional development in undeveloped and sparsely developed areas,
unless a location is essential for operational reasons e.g. for navigation
and water based recreation, agriculture, transport or utilities infrastructure
(which should be designed to be operational during floods and not impede
water flows).
• New caravan and camping sites 
Where development is permitted, measures to protect against or manage flood
risk will be required and any loss of flood storage capacity mitigated to achieve
a neutral or better outcome. Water resistant materials and construction must be
Page 312

Page 313

used where appropriate. Land raising and elevated buildings on structures such
as stilts are unlikely to be acceptable. 
b) Surface Water Drainage: Sustainable Urban Drainage Systems (SUDS)
Surface water from development must be dealt with in a sustainable manner that has
a neutral effect on flooding or which reduces the risk of flooding. The method of
dealing with surface water must also avoid pollution and promote habitat
enhancement and amenity. All sites must be drained by a sustainable drainage
system (SUDS) designed in line with current CIRIA guidance. Drainage systems
must contribute to enhancing existing "blue" and "green" networks while contributing
to place-making, biodiversity, recreational, flood risk and climate change objectives. 
When considering the appropriate SUDS design for the development the most
sustainable methods, such as rainwater harvesting, green roofs, bio retention
systems, soakaways, and permeable pavements must be considered first.  If it is
necessary to include surface water attenuation as part of the drainage system, only
above ground attenuation solutions will be considered, unless this is not possible
due to site constraints.   
If below ground attenuation is proposed the developer must provide a robust
justification for this proposal.  Over development of a site or a justification on
economic grounds will not be acceptable.  When investigating appropriate SUDS
solutions developers must integrate the SUDS with allocated green space, green
networks and active travel routes to maximise amenity and biodiversity benefits. 
Specific arrangements must be made to avoid the issue of permanent SUDS
features becoming silted-up with run-off. Care must be taken to avoid the spreading
and/or introduction of invasive non-native species during the construction of all
SUDS features.  On completion of SUDS construction the developer must submit a
comprehensive Operation and Maintenance Manual.  The ongoing maintenance of
SUDS for all new development will be undertaken through a factoring agreement, the
details of which must be supplied to the Planning Authority.   
All developments of less than 3 houses or a non-householder extension under 100
square metres must provide a Drainage Statement.  A Drainage Assessment will be
required for all developments other than those identified above. 
c) Water Environment
Proposals, including associated construction works, must be designed to avoid
adverse impacts upon the water environment including Ground Water Dependent
Terrestrial Ecosystems and should seek opportunities for restoration and/or
enhancement, if appropriate. The Council will only approve proposals impacting on
water features where the applicant provides a report to the satisfaction of the Council
that demonstrates that any impact (including cumulative) on water quality, water
quantity, physical form (morphology), river hydrology, sediment transport and
erosion, coastal processes (where relevant) nature conservation (including protected
species), fisheries, recreational, landscape, amenity and economic and social impact
can be adequately mitigated. 
The report must consider existing and potential impacts up and downstream of the
development particularly in respect of potential flooding. The Council operates a
Page 313

Page 314

presumption against the culverting of watercourses and any unnecessary
engineering works in the water environment. 
A buffer strip of at least 6 metres between any new development and all water
features is required and should be proportional to the bank width and functional river
corridor (see table on page 96). This must achieve the minimum width within the
specified range as a standard, however, the actual required width within the range
should be calculated on a case by case basis by an appropriately qualified individual.
These must be designed to link with blue and green networks, including appropriate
native riparian vegetation and can contribute to open space requirements. 
Developers may be required to make improvements to the water environment as part
of the development. Where a Water Framework Directive (WFD)¬ water body
specific objective is within the development boundary, or in proximity, developers will
need to address this within the planning submission through assessment of potential
measures to address the objective and implementation, unless adequate justification
is provided. Where there is no WFD objective the applicant should still investigate
the potential for watercourse restoration along straightened sections or removal of
redundant structures and implement these measures where viable. 
Width to watercourse Width of buffer strip (either side)
(top of bank) 
Less than 1m  6m
1-5m  6-12m
5-15m  12-20m
15m+  20m+ 
The Flood Risk Assessment and Drainage Impact Assessment for New Development
Supplementary Guidance provides further detail on the information required to
support proposals. 
EP13 FOUL DRAINAGE 
All development within or close to settlements (as defined in the Local Development Plan)
of more than 2,000 population must connect to the public sewerage system unless
connection  is not permitted due to lack of capacity. In such circumstances, temporary
provision of private sewerage systems may be allowed provided Scottish Water has
confirmed investment to address this constraint has been allocated within its investment
Programme and the following requirements have been met; 
• Systems must not have an adverse effect on the water environment
• Systems must be designed and built to a standard which will allow adoption by
Scottish Water
• Systems must be designed such that they can be easily connected to a public sewer
in the future. Typically this will mean providing a drainage line up to a likely point of
connection. 
All development within or close to settlements (as above) of less than 2,000 population will
require to connect to public sewerage except where a compelling case is made otherwise.
Factors to be considered in such a case will include size of the proposed development,
whether the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Page 314

Page 315

Where a compelling case is made, a private system may be acceptable provided it does
not pose or add a risk of detrimental effects, including cumulative, to the natural and built
environment, surrounding uses or amenity of the general area. 
Where a private system is deemed to be acceptable, within settlements as above or small
scale development in the countryside, a discharge to land, either full soakaway or raised
mound soakaway, compatible with Technical Handbooks (which sets out guidance on how
proposals may meet the Building  Regulations) must be explored prior to considering a
discharge to surface waters. 
Page 315

Page 316

Page 316

Page 317

REPORT TO: PLANNING AND REGULATORY SERVICES COMMITTEE ON 28
JUNE 2022 
SUBJECT: APPOINTMENT OF PUBLIC ANALYST, AGRICULTURAL
ANALYST 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the resignation of the appointed Public Analyst
and Agricultural Analyst and to formally appoint the successors. 
1.2 This report is submitted to Committee in terms of Section III, (E)(16) of the
Council's Scheme of Administration relating to the functions of the council as
the Environmental Health Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee appoints Karen Maddison B.Sc.
(Hons), M.Chem.A., C.Chem., M.R.S.C to act as Public Analyst and
Agricultural Analyst for Moray Council. 
3. BACKGROUND 
3.1 The currently appointed Public Analyst, Agricultural Analyst, Duncan
Campbell, retired on 30 June 2022. 
3.2 The Council is required to appoint a Public Analyst pursuant to Section 27 of
the Food Safety Act 1990 and Agricultural Analyst pursuant to Section 67 of
the Agriculture Act 1970 and Regulation 29 of The Feed (Hygiene and
Enforcement) (Scotland) Regulations 2005. 
3.3 The public analysts are employed in four laboratories located at Aberdeen,
Dundee, Glasgow and Edinburgh. 
3.4 Samples have to be submitted within 24 hours of being taken which makes
the transportation to the lab critical. This, taken with the cost of transportation,
makes the Aberdeen provision the most cost effective option.
Item 13
Page 317

Page 318

3.5 The Food Safety Act 1990 stipulates the qualifications to be held by a Public
Analyst. Dr Karen Maddison holds the relevant qualifications. 
3.6 The Feed (Sampling and Analysis and Specified Undesirable Substances)
(Scotland) Regulations 2010 stipulate the qualifications required for an
Agricultural Analyst. Dr Karen Maddison holds the relevant qualifications 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Appointment of this position will assist meet the priority of ensuring
caring and healthy communities 
(b) Policy and Legal
Appointment of Public Analyst and Agricultural Analyst is required under
Food Safety Act 1990 and Agriculture Act 1970. 
(c) Financial implications
This official is employed by Aberdeen Scientific Services Laboratory.
There will be no increase in costs associated with these appointments 
(d) Risk Implications
Non appointment of these officials will result in Moray Council not
meeting is statutory obligations. 
(e) Staffing Implications
There are no staffing implications in relation to these appointments. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this policy/activity because this is an official appointment only. 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, the Legal Services Manager, the
Equal Opportunities Officer, and L Rowan, Committee Services Officer
have been consulted and comments received have been incorporated
into the report. 
5. CONCLUSION 
Page 318

Page 319

5.1 The currently appointed Public Analyst and Agricultural Analyst retired
30 June 2022. 
5.2 Moray Council is required to appoint a Public Analyst and Agricultural
Analyst 
Author of Report:  Karen Sievewright
Environmental Health and Trading Standards Manager
Background Papers: 
Ref: 
Page 319

Page 320