Planning and Regulatory Services Committee 
Tuesday, 19 December 2023 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the
Planning and Regulatory Services Committee to be held at Council Chambers,
Council Office, High Street, Elgin, IV30 1BX on Tuesday, 19 December 2023 at
09:30. 
BUSINESS 
4a) Minute of Special Meeting dated 26 June 2023 3 - 24 
Page 1

Page 2

Page 2

Page 3

MORAY COUNCIL 
MINUTE OF THE SPECIAL MEETING OF THE PLANNING AND REGULATORY
SERVICES COMMITTEE 
26 JUNE 2023 
COUNCIL CHAMBERS, ELGIN 
PRESENT 
Councillors Gordon, Macrae, Cameron, Coull, Cowe, Divers, Dunbar, Gatt, Keith,
Lawrence, McBain, Ross, Van Der Horn and Warren 
APOLOGIES 
Apologies were intimated on behalf of Councillor Fernandes 
IN ATTENDANCE 
Head of Economic Growth and Development, Development Management and
Building Standards Manager, Mr N MacPherson, Principal Planning Officer, Mr R
Smith, Principal Planning Officer, Strategic Planning and Development Manager, Mrs
D Anderson, Senior Engineer (Transportation), Mr A Miller, Senior Planning Officer,
Miss K Donnachie, Planning Officer, Mr D Westmacott, Planning Officer, Legal
Services Manager and Mrs L Rowan, Committee Services Officer as Clerk to the
Committee. 
1. DECLARATION OF GROUP DECISIONS AND MEMBER’S INTERESTS 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior decisions
taken on how Members will vote on any item on the agenda. 
Councillor Dunbar declared an interest in Item 4 “Planning Application
22/00981/APP” and stated that she would remove herself from the chamber and take
no part in the debate of this item. 
Councillor Ross declared an interest in Item 7 “Consultation on Section 36 Proposals
– Clashindarroch Wind Farm Extension” and stated that he would leave the chamber
and take no part in the debate of this item as he had: 
• made comments in the press against more development in the Upper
Deveron Valley on the grounds of the cumulative impact; 
• attended meetings of the Cabrach Trust and the Upper Deveron Protest
Group; and 
• signed an open letter to Aberdeenshire and Moray Councils expressing
concerns against the overdevelopment of wind farms in the Upper Deveron
Valley. 
There were no further declarations of Member’s interests in respect of any item on
the agenda.
Item 4a)
Page 3

Page 4

2. EXEMPT INFORMATION 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting during consideration of the items of business
appearing at the relevant paragraphs of this minute as specified below, so as to
avoid disclosure of exempt information of the class described in the appropriate
paragraphs of Part 1 of Schedule 7A of the Act. 
Paragraph
No. of
Minute 
Paragraph No. of Schedule 7A
9 13 
Information, which if disclosed to the public, would reveal tha
the Authority proposes, for the purposes of consultaion, make
an order or direction under any enactment which might allow an
individual or organisation to defeat the purpose of the order 
3. PLANNING APPLICATION 22/00981/APP 
Councillor Dunbar, having declared an interest in this item, left the meeting at this
juncture and took no part in the debate. 
Ward 4 – Fochabers Lhanbryde 
Site redevelopment including new sawmill log storage/processing yard
rounding line buildings office and associated infrastructure at site at
Garmouth Road, Mosstodloch, Moray for James Jones & Sons Ltd 
A report was submitted by the Appointed Officer recommending that, for reasons
detailed in the report, planning permission be granted for a site redevelopment
including new sawmill log storage/processing yard rounding line buildings office and
associated infrastructure at site at Garmouth Road, Mosstodloch, Moray for James
Jones & Sons Ltd. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as the application is a major planning application. 
Following consideration, Councillor Cowe moved that the Committee agree to grant
planning permission in respect of Planning Application 22/00981/APP, as
recommended, subject to the conditions detailed within the report.  This was
seconded by Councillor Macrae. 
There being no-one otherwise minded, the Committee agreed to grant planning
permission in respect of Planning Application 22/00981/APP, as recommended,
subject to: 
Page 4

Page 5

(i) the completion of an appropriate legal agreement to secure developer
obligations in relation to footway improvements: 
(ii) the following conditions and reasons: 
1. No development shall commence until photographic evidence has been
submitted to the local planning authority from a qualified tree surgeon that all
trees have been protected in accordance with the approved Tree Protection
and Removal plan and tree surveys. The trees shall be protected throughout
the duration of the construction works and retained thereafter throughout the
lifetime of the development hereby approved unless otherwise agreed in writing
with the Council as Planning Authority. 
Reason: To ensure that the development is integrated into the surrounding
landscape/townscape and that features of value to the local area are retained. 
2. No development shall commence on the erection of the office building until full
details of the foul drainage arrangements have been submitted to and approved
in writing by the Council as Planning Authority.  The development shall
thereafter be completed in accordance with the approved details. 
Reason: To ensure that the development is satisfactorily serviced and that
there are no adverse effects on the natural and built environment and amenity. 
3. No development shall commence until an archaeological written scheme of
investigation (WSI) has been submitted to and approved in writing by the
Council as planning authority and a programme of archaeological works has
been carried out in accordance with the approved WSI. The WSI shall include
details of how the recording and recovery of archaeological resources found
within the application site shall be undertaken, and how any updates, if
required, to the written scheme of investigation will be provided throughout the
implementation of the programme of archaeological work. 
Should the archaeological works reveal the need for post excavation analysis
the development hereby approved shall not be brought into use until a post-
excavation research design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the Council as planning authority. The PERD shall
thereafter be carried out in accordance with the approved detail. 
The above works should be undertaken as a trial trenching evaluation of 7-10%
of the total proposed development site as well as an archaeological watching
brief over ground breaking works associated with the formation of the discharge
pipe towards the River Spey.   
These works to be undertaken by a suitably qualified archaeological contractor. 
Reason: To safeguard and record the archaeological potential of the area. 
4. No development shall commence until a detailed Biodiversity Plan has been
submitted to and approved in writing by the Council as Planning Authority. This
Page 5

Page 6

plan shall show the siting and details of all proposed insect and bird boxes, and
details of ongoing monitoring of biodiversity enhancements. The development
shall thereafter proceed in accordance with the approved details. 
Reason: To ensure that biodiversity is enhanced. 
5. No development shall commence until a detailed Decarbonisation Strategy has
been submitted to and approved in writing by the Council as Planning Authority.
This plan shall expand on the principles contained in the indicative
Decarbonisation Strategy and shall include (a) measures to improve the
efficiency of the operation of the development (including, but not limited to
industrial processes and building operations) in order to reduce potential
carbon emissions; (b) commitment to annually review operations, improve
efficiencies where practicable  and further reduce carbon emissions throughout
the lifetime of the development, should new technology/methodologies allow
and (c) details of the  carbon saving calculations and timescales for
implementation of actions in the   indicative strategy. The strategy and actions
shall thereafter be implemented in accordance with the approved details and
timescales, unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason: To ensure carbon emissions are minimised during the operation of the
development, in accordance with National Planning Framework Policy 26 –
Business and Industry. 
6. No development shall commence until a Community Wealth Building Plan has
been submitted to and approved in writing by the Council as Planning Authority.
This plan shall include  measures, targets and monitoring for the following
areas as appropriate  (a) improving community resilience, reducing inequalities
and maximising local job creation (b) increasing spending within communities
and ensuring the maximum use of local supply chains and services (c) creation
of new firms and (d) enabling community ownership of buildings and
infrastructure
The measures and monitoring shall thereafter be implemented in accordance
with the plan unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason: To support a new strategic approach to economic development that
helps to build a wellbeing economy in accordance with National Planning
Framework Policy 25 – Community Wealth Building. 
7. No development shall commence until a Construction Environmental
Management Plan (CEMP) has been submitted to and approved in writing by
the Council, as Planning Authority in consultation with the Environmental Health
Manager. The plan shall include: 
a) measures to minimise construction related noise (including vibration), dust
and artificial lighting on nearby residential properties and ecology, 
b) a waste management strategy for the construction stage to cover:
i. identification of the likely waste sources associated with the
construction of the development;
Page 6

Page 7

ii. proposed waste management requirements, including provisions to
maximise waste reduction and waste separation at source; and
iii. proposed waste management and storage strategy, which shall
include details of measures to minimise cross-contamination of
materials, storage of waste (including measures to ensure waste is
secure from wind/weather);
c) a scheme for surface water management to prevent run-off from the site
during construction works;
d) Soil management plan  including measures to ensure soil disturbance is
minimised during construction;
e) Construction Method Statement;
f)   Measures to ensure that any felling or vegetation clearance works happen
outside of the nesting bird season (typically March – August, inclusive). 
The above measures shall be accompanied by information for the timing of
their provision. Thereafter the development shall be carried out in accordance
with the approved details unless otherwise agreed with the Council, as
Planning Authority, in writing. 
Reason: In order to ensure environmental impacts are suitably managed and
minimised during the construction phase and in order that environmental
emissions are considered and managed at the construction phase, in order to
protect the amenity of local residents. 
8.   The development hereby approved shall be operated in accordance with the
approved Operational Plan drawing number AA6913/P/106 Revision A, Site
Masterplan and Noise Impact Assessment, including removal of the existing log
line unless otherwise agreed in writing with the Council as Planning Authority.  
Reason: To protect local residents from noise nuisance. 
9.  Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive
dwelling shall be permitted between 0800 - 1900 hours, Monday to Friday and
0800 - 1300 hours on Saturdays only, and at no other times out with these
permitted hours (including National Holidays). The above construction hours
shall apply, unless otherwise agreed in writing with the Planning Authority, and
where so demonstrated exceptional operational constraints require limited
periods of construction works to be undertaken out with the permitted
construction hours. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
10.  The development hereby approved shall not be brought into operation/use until
the arrangements for the disposal of surface water have been implemented in
accordance with the approved plans/ Surface Water Drainage Strategy and
certification from an appropriately qualified person confirming that the drainage
arrangements have been implemented in accordance with the approved plans
and strategy has been submitted to and approved in writing by the Council as
Planning Authority. The drainage systems shall thereafter be maintained in
accordance with the approved details including the maintenance details set out
in the approved Landscape Notes throughout the lifetime of the development
hereby approved.  
Page 7

Page 8

Reason: To ensure that the development is appropriately serviced and that
surface water is dealt with in a sustainable manner.  
11.  All landscaping works shall be implanted in accordance with the approved
plans, landscape notes and biodiversity plan in the first planting season
following completion or occupation (whichever is the sooner) of the
development hereby approved. Tree planting shall take place only when the
soil is sufficiently damp but not waterlogged. The landscaping shall be
maintained thereafter in accordance with the approved details throughout the
lifetime of the development hereby approved. After planting the trees will be
inspected regularly and sufficient watering will be undertaken to fully hydrate
the trees as necessary. Any trees or plants which (within a period of 5 years
from the planting) die, are removed or become seriously damaged or diseased
shall be replaced in the following planting season with others of similar size,
number and species unless otherwise agreed in writing by the Council, as
Planning Authority. 
Reason: To ensure that the approved landscaping works are timeously carried
out and properly maintained in a manner which will not adversely affect the
development or amenity and character of the area and to create a good
landscape setting for the development.   
12.  The development hereby approved shall be constructed in accordance with the
approved plans and site sections. 
Reason: To ensure that the development is appropriate to the surrounding
area and is integrated into the surrounding landscape. 
13.  The boundary fence around the site shall be constructed and coloured green in
accordance with the approved plans. 
Reason: To ensure that the development is appropriate to the surrounding
area and is integrated into the surrounding landscape. 
14.  The noise emissions associated with the development (inclusive of existing
sawmill operations) during daytime hours (0700 to 2300 hours) shall not exceed
the predicted sound levels stated in table 6, page 11 of the approved Noise
Impact Assessment supporting document by FEC Acoustics, dated 10th
February 2023, for James Jones & Sons Ltd and titled “Noise Impact
Assessment for proposed expansion of the James Jones timber yard at
Mosstodloch, Fochabers, Morayshire, Version 4.” For the avoidance of doubt
the sound levels shall be determined as the free field equivalent continuous
sound pressure level determined (by measurement or calculation) over a
reference period of one hour and measured in accordance with BS 7445 -1
2018 – Description and measurement of environmental noise. The location of
dwellings is marked as Figure 1, page 4 and as “Receivers” with Eastings and
Northings in Table 2 numbered 8, 10, 11, 12 and 14 of the approved Noise
Impact Assessment supporting document by FEC Acoustics, dated 10th
February 2023, for James Jones & Sons Ltd and titled “Noise Impact
Assessment for proposed expansion of the James Jones timber yard at
Mosstodloch, Fochabers, Morayshire, Version 4”.
Page 8

Page 9

Reason: To protect local residents from noise nuisance due to the use of the
development.
15. During the time period of 2300 to 0600 hours, the site attributed noise
associated with the development (inclusive of existing sawmill operations) shall
not exceed 37 dB (A) at the nearest noise sensitive dwelling which is lawfully
existing or has planning permission at the date of this permission. 
For the avoidance of doubt the sound levels shall be determined (by
measurement and or calculation) as the free field equivalent continuous sound
pressure level determined over a reference period of 15 minutes and measured
in accordance with BS 7445 -1 2018 – Description and Measurement of
Environmental Noise.
Reason: To protect local residents from noise nuisance due to the use of the
development.
16.   During the time period of 0600 to 0700 hours, the site attributed noise
associated with the development (inclusive of existing sawmill operations) shall
not exceed 42 dB(A) at the nearest noise sensitive dwelling which is lawfully
existing or has planning permission at the date of this permission. For the
avoidance of doubt the sound levels shall be determined (by measurement and
or calculation) as the free field equivalent continuous sound pressure level
determined over a reference period of 15 minutes and measured in accordance
with BS 7445 -1 2018 – Description and Measurement of Environmental Noise. 
Reason: To protect local residents from noise nuisance due to the use of the
development.
17.  The log sorting line and associated loading and unloading of the line shall only
be permitted between 0600 and 2300 hours and the log sorting line shall be
constructed in accordance with the approved plans unless otherwise agreed in
writing with the Council as Planning Authority.  
Reason: To protect local residents from noise nuisance due to the use of the
development within permitted hours.
18.  Sawmill operations within the designated sawmill building and the closed
production buildings shall be permitted between 0600 and 0200 hours. 
Reason: To protect local residents from noise nuisance due to the use of the
development within permitted hours.
19.  No development shall commence on site until a scheme of mitigation has been
submitted to and approved in writing by the Council as Planning Authority
detailing measures to implement a 10 dB(A) noise reduction to sound power
levels at the south east corner of the Processing Shed of the existing sawmill,
as detailed in table 1  and located in figure 1, item 6 of the approved  Noise
Impact Assessment supporting document by FEC Acoustics, dated 10th
February 2023, for James Jones & Sons Ltd and titled “Noise Impact
Assessment for proposed expansion of the James Jones timber yard at
Mosstodloch, Fochabers, Morayshire, Version 4”. The agreed scheme of
mitigation shall be implemented prior to the commencement of sawmilling
operations at the approved development and be thereafter maintained
throughout the lifetime of the development. 
Page 9

Page 10

Reason: To protect local residents from noise nuisance due to the use of the
development in addition with the existing sawmill operations.
20.  Throughout the lifetime of the development hereby approved, the dust
extraction system of the existing sawmill operations shall have silencers
maintained to achieve a 10 dB(A) noise reduction in accordance with the
agreed details in Appendix C “Information on Mitigation Measures”(pages 38-
43) of the approved Noise Impact Assessment supporting document by FEC
Acoustics, dated 10th February 2023, for James Jones & Sons Ltd and titled
“Noise Impact Assessment for proposed expansion of the James Jones timber
yard at Mosstodloch, Fochabers, Morayshire, Version 4”.
Reason: To protect local residents from noise nuisance due to the use of the
development.
21.  Unless otherwise agreed in writing with the Planning Authority, a 4m high earth
bank with a surface density of at least 10kg/m2 shall be provided on the north
and east boundary of the development as detailed in Figure 3, Appendix B 
(page 34 and titled “Existing Sound Map”) of the approved  Noise Impact
Assessment supporting document by FEC Acoustics’ dated 10th February 2023,
for James Jones & Sons Ltd and titled “Noise Impact Assessment for proposed
expansion of the James Jones timber yard at Mosstodloch, Fochabers,
Morayshire, Version 4”, and located in drawing No. AA6913/LP/10, Revision K
and titled “Proposed Site Landscape Proposals”. 
Reason: To protect local residents from noise nuisance due to the use of the
development.
22.  No development shall commence until details (in terms of material, design, and
surface density ) of the proposed 4 metre high acoustic barrier  on the east
boundary of the existing sawmill , as detailed and located in Figure 3, Appendix
B of the approved Noise Impact Assessment supporting document by FEC
Acoustics, dated 10th February 2023, for James Jones & Sons Ltd and titled
“Noise Impact Assessment for proposed expansion of the James Jones timber
yard at Mosstodloch , Fochabers, Morayshire, Version 4.”, and marked on
drawing No. AA6913/LP/10 Revision K, and titled “Proposed Site Landscape
Proposals” has been submitted to and approved in writing by the Council as
Planning Authority.  
The barrier shall thereafter be installed and maintained throughout the lifetime
of the development. 
Reason: To protect local residents from noise nuisance due to the use of the
development in addition with the existing sawmill operations.
23.  No development shall commence until a scheme of mitigation  has been
submitted to and approved in writing by the Council as Planning Authority
detailing measures to implement a 5 dB(A) noise reduction to the log sorter, as
identified in table 5 and illustrated in figure 3 of the approved Noise Impact
Assessment supporting document by FEC Acoustics, dated 10th February
2023, for James Jones & Sons Ltd and titled “Noise Impact Assessment for
proposed expansion of the James Jones timber yard at Mosstodloch,
Fochabers, Morayshire, Version 4.” and the indicative plan AA 6913/P303 titled
“Log sorting line covered areas”. The agreed scheme of mitigation shall be
Page 10

Page 11

implemented prior to the commencement of sawmilling operations at the
approved development and be thereafter maintained throughout the lifetime of
the development. These details shall reflect the requirement for any enclosures
to be of muted colours and finishes.  
Reason: To protect local residents from noise nuisance due to the use of the
development and to ensure that the development is appropriate to the
surrounding area and is integrated into the surrounding landscape.
24.  Unless otherwise agreed in writing with the Planning Authority, a 4m high
barrier of stacked timber logs shall be located and maintained north of the log
line similarly to or at the locations identified in figure 3 and marked in green as
item 8 in page 9 of the approved  Noise Impact Assessment supporting
document by FEC Acoustics, dated 10th February 2023, for James Jones &
Sons Ltd and titled “Noise Impact Assessment for proposed expansion of the
James Jones timber yard at Mosstodloch , Fochabers, Morayshire, Version 4”. 
Reason: To protect local residents from noise nuisance due to the use of the
development. 
25.  No development shall commence until details of the final chosen design of
operational site lighting have been submitted to and approved in writing by the
Council as Planning Authority. These details to ensure during the operational
phase that the lighting levels do not exceed that stated in Section 3 and the
related Appendices in the supporting document by LightSIM Limited, dated 16th
June 2022 - Issue 03 and titled “James Jones Sawmill, Mosstodloch, Moray.
External Lighting Assessment for Planning Application ref 21/01290/PEMAJ”.
Thereafter, the agreed lighting details shall be maintained throughout the
lifetime of the development. 
Reason: To protect local residents from light nuisance due to the use of the
development.
26. Prior to completion of the development or any part of the development
becoming operational, the works to widen Garmouth Road to 7.3m and provide
a 3 metre wide cyclepath on its west side shall be completed in accordance
with the approved details unless otherwise agreed in writing by the Planning
Authority. 
Reason: To ensure acceptable infrastructure is provided on the route to/from
the development in the interests of road safety and the provision of
infrastructure to support the use of low carbon transport. 
27.  Prior to the completion or occupation of the development (whichever is
soonest) a 2 metre wide grass verge shall be provided in accordance with the
approved details as shown on drawing AA6913/P/400 Rev F, any fences or
other features shall be removed or set back behind the verge and any planting
shall be removed or cut back and maintained behind the verge.
Reason: In the interests of road safety for the proposed development and other
road users. 
28.  Notwithstanding the details for the visibility splays submitted on drawing
AA6913/P/400 Rev F (which are not accepted as they do not show the land to
the north within control of the applicant and do not show walls fences and
planting set back behind the visibility splay.) no work shall commence until; 
Page 11

Page 12

i) a detailed drawing (scale 1:1000 min which shall also include details to
demonstrate control of the land) showing the visibility splay 4.5 metres by
215 metres to the north, and 4.5 metres by 120 metres to the south,
showing boundary walls/fences/hedges set back to a position behind the
required visibility splay, and a schedule of maintenance for the splay area
has been  submitted to and approved by the Council, as Planning
Authority in consultation with the Roads Authority; and
ii) the visibility splay shall be provided in accordance with the approved
drawing prior to any works commencing (except for those works
associated with the provision of the visibility splay); and
iii) thereafter, the visibility splay shall be maintained at all times free from any
obstruction exceeding 0.6 metres above the level of the carriageway in
accordance with the agreed schedule of maintenance. 
Reason: To enable drivers of vehicles entering or exiting the site to have a
clear view so that they can undertake the manoeuvre safely and with the
minimum interference to the safety and free flow of traffic on the public road. 
29.    Notwithstanding the information contained in the submitted Construction Traffic
Management Plan no works shall commence on site until a detailed
Construction Traffic Management Plan has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority. The Construction Traffic Management Plan shall include the following
information:
• duration of works;
• construction programme;
• number of vehicle movements (i.e. materials, plant, staff, components);
• anticipated schedule for delivery of materials and plant;
• full details of any temporary construction access and traffic management
measures;
• measures to be put in place to prevent material being deposited on the
public road;
• measures to be put in place to safeguard the movements of pedestrians;
• traffic management measures to be put in place during works including
any specific instructions to drivers; and
• parking provision, loading and unloading areas for construction traffic. 
Thereafter, unless otherwise agreed in writing by the Planning Authority the
development shall be implemented in accordance with the approved details. 
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site. 
30.  Notwithstanding the details submitted for the proposed car parking (which are
not acceptable as they do not include disabled parking provision) details shall
be submitted to demonstrate the provision of: 
• 39 standard spaces (minimum);
• 2 disabled parking spaces;
• 10 cycle spaces (secure and weatherproof). 
Thereafter the parking and cycle spaces shall be provided in accordance with
the approved details prior to completion or the development becoming
Page 12

Page 13

operational (whichever is soonest), and shall be maintained and available for
that purpose unless otherwise agreed in writing by the Planning Authority. 
Reason: To ensure the permanent availability of the level of parking necessary
for staff/visitors, the provision of infrastructure to support the use of low carbon
transport and to ensure an acceptable development through the provision of
details currently lacking. 
31.    Notwithstanding the details submitted, no development works shall commence
until a detailed drawing (scale 1:200) has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority confirming the provision of 4 Electric Vehicle (EV) charging units
connected to an appropriate electricity supply, including details (written
proposals and/ or plans) to confirm the provision of the necessary cabling,
ducting, and consumer units capable of supporting the charging units and
infrastructure; and thereafter the EV charging infrastructure shall be provided in
accordance with the approved drawing and details prior to the completion of the
development. 
Reason: In the interests of an acceptable form of development and the
provision of infrastructure to support the use of low carbon transport, through
the provision of details currently lacking. 
32.  Prior to completion or the development becoming operational (whichever is
soonest), the first 20m of the site access onto the B9105 Garmouth Road,
measured from the edge of the public road, shall be constructed to the Moray
Council specification and surfaced with bituminous macadam. 
Reason: To ensure an acceptable vehicular access is provided to the
development in the interest of road safety. 
33.  No boundary fences, hedges, walls or any other obstruction whatsoever over
1.0 metre in height and fronting onto the public road shall be within 2.4 metres
of the edge of the carriageway, measured from the level of the public
carriageway, unless otherwise agreed in writing by the Council, as Planning
Authority in consultation with the Roads Authority. 
Reason: To enable drivers of vehicles leaving driveways to have a clear view
over a length of road sufficient to allow safe exit, in the interests of road safety
for the proposed development and other road users. 
Councillor Dunbar re-joined the meeting at this juncture. 
4. PLANNING APPLICATION 22/01255/HHCOMP 
Ward 2 – Keith and Cullen 
Application for High Hedge Notice at Kilmorack, Broomhill Road, Keith, Moray
for Mr Colin Crocket 
A report was submitted by the Appointed Officer recommending that, for reasons
detailed in the report, a High Hedge Notice be issued by the Council at Kilmorack,
Broomhill Road, Keith, Moray for Mr Colin Crocket. 
Page 13

Page 14

The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as it relates to an application for a High Hedge Notice. 
Following consideration, given the application relates to a high hedge, and that the
high hedge is having an adverse impact on the reasonable enjoyment of the
applicant’s property, the Committee agreed a High Hedge Notice should be issued
by the Council. 
1. The High Hedge Notice should instruct the hedge owner to reduce Portion 2 of
the hedge, shown in red in Appendix 2 to the height of 2m and Portion 3 of the
hedge also shown in red in Appendix 2 to the height of 3.5m and that these
works are to be carried out within twelve weeks of the Notice taking effect. 
2. In addition, the Notice should stipulate that Portion 2 of the hedge should be
maintained on an annual basis to ensure that its height does not exceed 2.5m
and Portion 3 of the hedge should be maintained on an annual basis to ensure
that its height does not exceed 4m.   
3. The initial reduction in height of the hedge must be conducted out with the bird
nesting season which occurs within March, April, May, June, July and August.
This exclusion period may be relaxed if a detailed nesting survey of the affected
area confirming that nests are not present/in use is submitted to and agreed by
the Moray Council prior to any lopping or pollarding being carried out. 
5. PLANNING APPLICATION 22/01396/PPP 
Ward 6 – Elgin City North 
Proposed 40 bed care home on Land to the rear of Eight Acres Hotel, Morriston
Road, Elgin, Moray for Parklands Developments Ltd 
A report was submitted by the Appointed Officer recommending that, for reasons
detailed in the report, planning permission be granted for a proposed 40 bed care
home on land to the rear of Eight Acres Hotel, Morriston Road, Elgin, Moray for
Parklands Developments Ltd. 
The meeting noted that the application had been referred to Committee in terms of the
Scheme of Delegation as the gross floor space is in excess of 2000 square metres. 
Following consideration, the Committee agreed to grant planning permission in
respect of Planning Application 22/01396/PPP, as recommended, subject to the
following conditions and reasons: 
1. In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 as amended: 
(a)   That in the case of any matter specified in conditions attached to the
planning permission in principle, application for approval of matters
specified in conditions must be made before:- 
(i)   that expiration of 3 years from the date of the grant of planning
permission in principle; or 
(ii)  the expiration of 6 months from the date on which an earlier
application for such approval for the same matters was refused; or 
(iii)   the expiration of 6 months from the date on which an appeal against
such refusal was dismissed; whichever is the latest, and 
Page 14

Page 15

(b)   That the development to which the permission relates must be begun not
later than whichever is the later of the following dates:- 
(i)   the expiration of 3 years from the date of the grant of planning
permission in principle; or 
(ii)   the expiration of 2 years from the final approval of the matters
specified in conditions or in the case of approval on different dates
the final approval of the last such matter to be approved.  
If an application for approval of matters specified in conditions has not been
made or the development has not begun within the specified dates this
planning permission in principle shall lapse unless there is a specific condition
attached to this permission which varies the stated timescales. 
Reason: The time limit condition is in accordance with section 59 of the Town
and Country Planning (Scotland) Act 1997 as amended. 
2.   The approval hereby granted is for planning permission in principle and prior to
the commencement of the development approval of matters specified in
conditions, including the siting, design and external appearance of the
building(s) the means of access thereto and the landscaping of the site shall be
obtained from the Council, as Planning Authority. 
Reason: In order to ensure that the matters specified can be fully considered
prior to the commencement of development. 
3.   The grant of planning permission in principle hereby granted for the proposed
development shall be carried out only in accordance with detailed drawings
which shall previously have been submitted to and approved by the Council, as
Planning Authority. These drawings shall show the matters specified in
conditions numbered 4-8 below. 
Reason: As the approval is granted for planning permission in principle only
and in order that detailed consideration can be given to the matters specified. 
4.  Plans, sections and elevations of all buildings proposed with details of the type
and colour of all external materials and finishes, as well as external lighting of
the building, car park and grounds shall be submitted in accordance with
condition no. 2 above. 
Reason: As the approval is granted for planning permission in principle only
and in order that detailed consideration can be given to the matters specified. 
5.   The proposed layout of the site showing the exact position of the site
boundaries, the position of all buildings, the means of access, areas for vehicle
parking and the arrangements for the disposal of foul and surface water (i.e. a
SUDS system or equivalent) shall be submitted in accordance with condition
no. 2 above. 
Reason: As the approval is granted for planning permission in principle only
and in order that detailed consideration can be given to the matters specified. 
6.   Details of the exact extent, type and finish of all other works including walls,
fences and other means of enclosure and screening shall be submitted in
accordance with condition no. 2 above.
Page 15

Page 16

Reason: As the approval is granted for planning permission in principle only
and in order that detailed consideration can be given to the matters specified. 
7.   Sections through the site showing the development on its finished levels in
relation to existing levels shall be submitted in accordance with condition no. 2
above. 
Reason: As the approval is granted for planning permission in principle only
and in order that detailed consideration can be given to the matters specified. 
8.  Landscaping proposals showing any existing trees/hedges/shrubs to be
retained or removed together with details of the type, position and number of all
planting to be undertaken and details of all surfacing materials shall be
submitted in accordance with condition no. 2 above. 
Reason: As the approval is granted for planning permission in principle only
and in order that detailed consideration can be given to the matters specified. 
9.  Prior to the commencement of development details of retention/diversion of a
pathway through the northern part of the site connecting the existing access to
the north of the hotel and the Quarry Wood to the west shall be submitted and
approved in writing by the Council, as Planning Authority. Thereafter the path
shall be provided prior to development commencing. Thereafter use of the
pathway shall be maintained/provided for use during construction works and
post completion unless otherwise agreed in writing with the Council, as
Planning Authority. 
Reason: To ensure access rights for the public through the northern part of the
site are retained. 
10.  As part of condition 5 in respect of the drainage of the site, all drainage shall be
designed in accordance with the information contained in the approved
Drainage Impact Assessment (by hga, reference number 3871 issue 1, dated
22 Sept 2022). 
Reason: To ensure drainage is designed and provided in accordance with the
detailed agreed in the approved Drainage Impact Assessment. 
11.  As part of condition 4 in respect of the design of the proposed care home, the
building shall be no more than two storeys in height. 
Reason: To ensure the design of the building is in keeping with the scale and
character of development in the surrounding area. 
12.  The development shall be carried out in full accordance with the mitigation and
recommendations contained in section 6 of the approved Preliminary Ecological
Appraisal in respect of Flora, Amphibians and Reptiles, Birds, Bats and Other
Mammals. 
Reason: To ensure the development does not adversely impact on species
that may be present on or adjacent to the site. 
Page 16

Page 17

13.  No development shall commence until a scheme of biodiversity enhancement
(together with timescale for provision) in line with the recommendations
contained in section 6.34 of the approved Preliminary Ecological Appraisal has
been submitted to and approved in writing by the Council, as Planning
Authority. Thereafter the measures shall be implemented in accordance with
the approved details.                                                                                               
Reason: To ensure suitable biodiversity enhancement is provided as part of
this proposal, in accordance with National Planning Framework 4 Policy 3 –
Biodiversity. 
14.  No development shall commence until a statement, which demonstrates the
proposal will be sited and designed to meet the following requirements has
been submitted to and approved in writing by the Council, as Planning
Authority: 
• minimise lifecycle greenhouse gas emissions as far as possible; and
• adapt to current and future risks from climate change. 
This statement shall address the requirements of the “Moray Council’s Carbon
Guidance for Planning Applications and S36 and S37 consents” insofar as they
are relevant to the proposal, and provide timescales for the full implementation
of any measures specified. 
Thereafter the development shall be implemented in full accordance with the
approved details unless otherwise agreed with the Council, as Planning
Authority. 
Reason: To ensure compliance with National Planning Framework 4 Policy 2 –
Climate Mitigation and Adaption. 
15.  No development shall commence until a Waste Management Plan shall be
submitted to and approved in writing by the Council. The Waste Management
Plan shall relate to the operation of the development hereby approved and
include information on the following:
a) identification of the likely waste sources associated with the operation of
the development;
b) proposed waste management requirements, including provisions to
maximise waste reduction and waste separation at source; and
c) proposed waste management and storage strategy, which shall include
details of:
i.  measures to minimise cross-contamination of materials;
ii. storage of waste and by-products (including measures to ensure
waste is secure from wind/weather);
iii. provision of access for collection of waste, and; 
iv. recycling and localised waste management facilities. 
Thereafter, the Waste Management Plan shall be implemented in full
accordance with the details hereby approved prior to the completion or first
operation of development hereby approved (whichever is the soonest). 
Reason: To ensure waste is minimised as a result of the operation of the
proposed development, in accordance with National Planning Framework 4
Policy 12 - Zero Waste.
Page 17

Page 18

16.  No development shall commence until a Construction Environmental
Management Plan (CEMP) shall be submitted to and agreed in writing by the
Council, as Planning Authority in consultation with the Environmental Health
Manager. The plan shall include:
a) measures to minimise construction related noise, vibration, dust and
artificial lighting on nearby residential properties and ecology, including
the nearby Quarry Wood SSSI;
b) a waste management strategy that includes:
i. identification of the likely waste sources associated with the
operation of the development;
ii. proposed waste management requirements, including provisions to
maximise waste reduction and waste separation at source; and
iii. proposed waste management and storage strategy, which shall
include details of measures to minimise cross-contamination of
materials, storage of waste (including measures to ensure waste is
secure from wind/weather), provision of access for collection of
waste, and recycling and localised waste management facilities;
c) measures to ensure soil disturbance is minimised during construction; 
d) protection measures for trees on and adjacent to the site to be provided
during the course of works; and
e) a scheme for the layout and location of construction compound(s)
including parking, fencing, plant and temporary buildings, as well as timing
for provision and removal/reinstatement. 
The above measures shall be accompanied by information for the timing of
their provision. Thereafter the development shall be carried out in accordance
with the details hereby approved unless otherwise agreed with the Council, as
Planning Authority, in writing. 
Reason: To ensure environmental impacts are suitably managed and
maintained during the construction phase. 
17.  Prior to development commencing the tree protection measures as specified in
Section 7.0 – 7.4 and shown in Appendix Five: Tree Protection Plan of the
approved Arboricultural Report shall be provided in full and retained until
completion of construction works. Thereafter post construction a survey shall
be undertaken in accordance with section 7.5 of the approved Arboricultural
Report and its findings reported to the Council, as Planning Authority along with
timescale for implementation of any suggested mitigation/remedial works
required to ensure tree health and site safety. 
Reason: To ensure tree protection measures are provided in full accordance
with the details approved as part of this application. 
18.  No development shall commence until a detailed drawing (scale 1:200)
showing  the type and specifications of the proposed EV charging units(s) to
serve a minimum 3 spaces with a minimum power output of 22Kw (Rapid
Charger). EV charging unit is to be connected to an appropriate electricity
supply and should include details (written proposals and plans) to confirm the
provision of the necessary cabling, ducting, and consumer units capable of
supporting the future charging unit. 
Page 18

Page 19

Thereafter the EV charging facilities shall be provided in accordance with the
approved details prior to the development becoming operational or opened to
the public and maintained for use thereafter unless otherwise agreed in writing
by the Planning Authority in consultation with the Roads Authority. 
Reason: In the interests of an acceptable form of development and the
provision of infrastructure to support the use of low carbon transport, through
the provision of details currently lacking from the submission. 
19.  As part of condition 5 in respect of parking layout, no development shall
commence until a scheme of car parking (including disabled parking spaces)
shall be provided at a rate as shown in drawing No. 133-200 F submitted on
28.03.2023. Thereafter, the parking spaces shall be provided in accordance
with the approved details and be retained and available for use for the lifetime
of the development, unless otherwise agreed in writing by the Council, as
Planning Authority. 
Reason: To ensure the permanent availability of the level of parking necessary
for employees/visitors/others in the interests of an acceptable development and
road safety. 
20.  No development shall commence until details have been submitted and
approved in writing by the Council, as Planning Authority (plans scale 1:200
min) showing the design and location for the provision of secure, covered and
enclosed cycle parking for a minimum of 4 cycles. Thereafter the cycle parking
shall be provided prior to the building being completed or becoming operational
and shall be maintained and available for use thereafter for the lifetime of the
building use unless otherwise agreed in writing by the Planning Authority. 
Reason: In the interests of sustainable transport, the provision of cycle parking
and the provision of details currently lacking from the submission. 
21.  No water shall be permitted to drain or loose material be carried onto the public
footway/carriageway. 
Reason: To ensure the safety and free flow of traffic on the public road and
access to the site by minimising the road safety impact from extraneous
material and surface water in the vicinity of the new access. 
22.  The access to the site and vehicle circulation inside the development shall be
developed to accommodate vehicle swept paths in accordance with the
drawing submitted as Appendix 02 of the updated Transport Statement. 
Reason: To ensure acceptable infrastructure at the development access. 
23.  Prior to the operation or completion of the care home, whichever is the sooner,
a pedestrian access shall be provided on the southern boundary of the site
connecting to the existing footway along the A96 as shown in the drawing No.
133-200 F submitted on 28.03.2023. 
Reason: To minimise the walking distance for staff/visitors who may be arriving
by public transport. 
Page 19

Page 20

24.  No development shall commence until a Community Wealth Building Plan has
been submitted to and approved in writing by the Council as Planning Authority.
This plan shall include measures, targets and monitoring for the following areas
as appropriate  
(a)   improving community resilience, reducing inequalities and maximising
local job creation;
(b)   increasing spending within communities and ensuring the maximum use
of local supply chains and services;
(c)   creation of new firms and;
(d)   enabling community ownership of buildings and infrastructure. 
The measures and monitoring shall thereafter be implemented in accordance
with the plan unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason:  To support a new strategic approach to economic development that
helps to build a wellbeing economy in accordance with National Planning
Framework 4 Policy 25 – Community Wealth Building. 
6. CONSULTATION ON SECTION 36 PROPOSAL TO ERECT A WIND
ENERGY DEVELOPMENT, 22 TURBINES UP TO 200M HIGH AT
CABRACH, MORAY KNOWN AS CLASHINDARROCH EXTENSION FOR
CLASHINDARROCH WIND FARM EXTENSION LIMITED 
Councillor Ross, having declared an interest in this item, left the meeting at this
juncture and took no part in the debate. 
A report by the Depute Chief Executive (Economy, Environment and Finance) asked
the Committee to consider the consultation received from the Energy Consents Unit
(ECU) of the Scottish Government in relation to an Electricity Act 1989 Section 36
application (which includes deemed planning permission) for a new windfarm
extension.  This Section of the Electricity Act relates to consenting onshore electricity
generation. 
The Chair stated that, in his opinion, the proposal was contrary to the following
polices in National Planning Framework 4 (NPF4): 
NPF policy 29 rural development
b) proposals should be suitably scaled, sited and designed and in keeping with the
character of the area. 
c)  development proposals in remote rural areas should:
i) support local employment
iii) be suitable in terms of location, access, siting design and environmental
impact 
NPF policy 4 Natural places
Protect important and natural assets
d)  Open uplands with settled glens, though not a designated special landscape
area, is close to Ben Rinnes which is a special landscape area, and borders the
Cairngorms National Park.  
i) has adverse effects on the integrity of the area and its qualities
ii) adverse effects are not clearly outweighed by economic benefits of local
importance
Page 20

Page 21

NPF policy 3 Biodiversity
This policy asks to demonstrate conclusively that the development proposal will
conserve, restore and enhance biodiversity.  With a 2,000 acre site and 22 large
turbines, the destruction and displacement of species, peat and flora and fauna is
inevitable and, even with some compensatory planting, surely irreplaceable. 
NPF policy 11 Energy
c)  proposal does not maximise net economic impact and local benefit
e) ii) landscape and visual impacts are significant.  These are not localised but will
have a larger area-wide visual impact compounded by existing windfarms (xiii
cumulative impacts).  There has been no meaningful attempt at design
mitigation or reduction of scale in any way by the Applicant. 
NPF policy 25 Community Wealth Building
Proposal does not maximise net economic impact as stated in the report 
Moray Wind Energy Landscape Sensitivity Study
This study was approved by this Committee, on the 14 March 2023, to inform
responses to section 36 consultations and is based on guidance from Nature
Scotland.  Its strategic conclusions, reflecting local knowledge, are that:
1) Few upland areas remain which do not accommodate windfarm developments
in Moray.
2) All the assessment units have a high sensitivity to turbines over 150m in
height.
3) Assessment unit 14 in which this development proposal is in, concludes a
high sensitivity to turbines over 150 m height and high-medium sensitivity to
100-150 in height. 
In addition:
1) The proposed development of 22 turbines up to 200 m high, over 2,000 acres
site would dominate the key scenic approach to the Cabrach at the A941
(noted on p295 of the Landscape Sensitivity Study (LSS)) proposed turbines
and infrastructure being sited less that 2km from it. 
2) The Buck 721 m (is a landmark hill, denoted as such in our LSS) and a
popular tourist destination.  From the summit, Dorenell Windfarm, Kildrummy
and the existing Clashindarroch are visible but the turbine heights only
average 109 meters.  This new extension will dwarf the existing
Clashindarroch in scale and massing. 
3) A site visit demonstrated that the proposed development will be highly visible
from the Cabrach village with the upper thirds of the turbines visible over the
skyline. 
4) Personal observation from popular core path SP30 at viewpoint Dead Wife’s
Hillock, in the Cabrach, the Tap O Noth (landmark Hill) will be obscured
unless wind turbines 19 and 21 are re-sited. 
5) North of Inverharroch Farm and going northeast along the unclassified road,
(site visit) the turbines will be about a km from nearby farms and highly visible
from over the ridge. 
The Chair concluded by stating that, whilst he appreciated Officers’ proposals to
offer advice on mitigation, scaling down and conditioning substantial community and
regional benefits, he remained of the view that the proposal was contrary to the
policies noted above and all other policies noted in Appendix 1 of the report, and
Page 21

Page 22

moved that the Committee agree recommendation 2.1  ii) and iv).  On failing to find a
seconder, his motion fell. 
Councillor Macrae welcomed the suggested conditions set out in Appendix 3 of the
report and, given that the Council has declared a climate emergency, moved that the
Committee agree recommendations i) and iv). 
Councillor Van Der Horn raised concern in relation to the impact the proposal would
have on deep peat and noted that recommendation 5 in the suggested response to
the consultation set out in Appendix 1 of the report asked that consideration be given
to removing or re-positioning turbines 16, 17 and 19 to avoid deep peat however
asked that the word “consider” be removed and that the Committee recommend that
wind turbines 16, 17 and 19 be removed or repositioned. 
In response, Mr MacPherson advised that if the Committee agreed, the word
“consider” could be removed.  He further advised that suggested conditions provided
by the Transportation Service had not been included in the report, this had been an
oversight, however these had been circulated to the Committee prior to the meeting
and advised that, should the Committee agree the conditions set out in Appendix 3,
these would be included. 
After considering Councillor Van Der Horn’s suggestion, Councillor Macrae agreed to
amend his motion to include the removal of the word “consider” at recommendation 5
in the suggested response to the consultation set out in Appendix 1 including the
conditions from the Transportation Service that had been accidentally omitted from
the report. 
There being no-one otherwise minded, the Committee agreed to: 
(i) note the contents of the report, as set out in Appendix 1-3, including the
conclusions about the planning and wider merits of the development as set out in 
Section 5 of the report, where taking into account National Planning Framework 4,
Moray Local Development Plan 2020 and all other material considerations, and
agreed that Moray Council does not object to the Section 36 application, but
raises significant concerns and suggests amendments/mitigation referred to in
Appendix 1 subject to the removal of the word “consider” from recommendation
number 5; and 
(ii) send (without prejudice to any concerns or objections) the draft conditions
contained within Appendix 3 to the ECU seeking further involvement in the
formulation of any final list of conditions and delegate authority to officers
regarding conditions in the event of the Section 36 being approved, subject to the
inclusion of the suggested conditions from the Transportation Service that had
accidentally been omitted from the report. 
Councillor Ross re-joined the meeting at this juncture. 
7. VALIDATION REQUIREMENTS FOR THE DETERMINATION OF PLANNING
APPLICATIONS AND OTHER CONSENTS 
Under reference to paragraph 7 of the Minute of the meeting of this Committee dated
5 December 2017, a report by the Depute Chief Executive (Economy, Environment
Page 22

Page 23

and Finance) asked the Committee to agree the revised standards of validation in
the determination of planning applications following the adoption of National
Planning Framework 4 (NPF) which now forms part of the statutory development
plan. 
Following consideration, the Committee agreed: 
i) that, for the purposes of Development Management, validation requirements will
be enhanced to meet the requirements of National Planning Framework 4; 
ii) Moray’s validation document for planning applications and other consents,
attached at Appendix 1 to the report; and 
iii) to hold a workshop with local agents/developers to inform how the enhanced
validation requirements are to be used for Development Management purposes. 
8. TREE PRESERVATION ORDERS 
Under reference to paragraph 13 of the Minute of the meeting of this Committee
dated 20 December 2022, a report by the Depute Chief Executive (Economy,
Environment and Finance) asked the Committee to confirm the revocation of TPOs
at Croft Road (Forres) and Fogwatt, without modification. 
Following consideration, the Committee agreed to confirm, without modification:- 
(i) Moray Council (Croft Road, Forres) Revocation of Tree Preservation Order 2023;
and 
(ii) Moray Council (Fogwatt) Revocation of Tree Preservation Order 2023. 
9. LAND ADVERSELY AFFECTING AMENITY OF NEIGHBOURHOOD [PARA
13] 
A report by the Depute Chief Executive (Economy, Environment and Finance)
sought approval to take direct action in respect of the untidy state of the area of land
surrounding the Oldmills, Oldmills Road, Elgin (‘the site’) which is having an adverse
effect on the amenity of the neighbourhood. The direct action will take the form of
removing accumulated rubbish from the site in line with the Amenity Notice served. 
Following consideration, the Committee agreed to grant delegated authority to the
Head of Economic Growth and Development, in consultation with the Chair of the
Committee, to take direct action to remove all items described in the Amenity Notice
served on the 24 April 2023 in the event that the terms of the notice are not complied
with by the owner of the site and to recover any costs incurred, as a result of direct
action, as a civil debt. 
Page 23

Page 24

Page 24