Management Committee 
Date: 5th December 2025 
Argyll and Bute Council Economic Strategy Action Plan, 2025-208 
1.0 Purpose 
1.1 The purpose of this paper is to provide members of the Community Planning Partnership (CPP)
Management Committee with the updated Economic Strategy Action Plan (ESAP) (see
Appendix 1) to implement and deliver the Argyll and Bute Council Economic Strategy, 2024-
2034, covering the short-term period 2025-2028. The ESAP 2025-2028 was approved by Argyll
and Bute Council’s Environment, Development and Infrastructure Committee on 11th September
2025. 
2.0 Recommendations 
2.1 The CPP Management Committee is asked to:
• Note the content of this paper. 
3.0 Background 
3.1 A successful economy is essential to delivering and achieving the CPP priorities, including the
delivery of transport infrastructure, (worker) housing, and community wellbeing. The ESAP 2025-
2028 aligns to these priorities and that of Argyll and Bute Council to deliver inclusive economic
growth and population sustainability – all of which contribute to our quality of life as a place to live,
work, learn and visit. With the pace of global economic change, technology and uncertainty
accelerating, the ESAP is updated annually to reaffirm our strategic intent over the next three
years, 2025-2028. 
3.2 A key requirement of ESAP is that it is an ongoing working document that contains actions that are
SMART (Specific, Measurable, Achievable, Realistic, Time-bound) and delivers opportunities
that drive economic growth and a fair and inclusive wellbeing economy across the four strategic
pillars: people, place, planet and prosperity. 
4.0 Detail 
4.1 The need for collaboration and the interplay between economy, environment and community
has never been stronger. Argyll and Bute, as a predominately rural region of Scotland, is
particularly well placed to benefit from the potential of the area’s natural capital resources and
the role it can play in providing a range of employment opportunities including green jobs and
achieving net zero across key industries. 
4.2 Many of the actions within the ESAP, 2025-2028, will not be fully realised until the medium term,
where their delivery depends on strong collaboration and a joined-up approach, working closely
with internal council colleagues across services, the Argyll and Bute Community Planning
Partnership (CPP), both Governments, partner agencies and key stakeholders across Argyll
and Bute at both a regional and national level .

Page 2

2 
Classification: OFFICIAL
4.3 With limited resources there is a need to focus on the key interventions where we can make the
greatest impact. A core focus of the updated action plan is for Argyll and Bute to be an inclusive
and wellbeing economy through embedding a Community Wealth Building approach that
enables people of all abilities to reach their full potential. Key sectors for our area include
tourism, food and drink, defence industries and clean energy production with the increasing
importance of private sector investment and SMEs in the local economy creating employment
opportunities associated with our natural and built environment that seeks to retain and
generate wealth in our communities. 
5.0 Conclusions 
5.1 The Argyll and Bute economy is undergoing significant changes, presenting both distinct short
and longer-term opportunities and challenges to overcome. The actions outlined in Appendix 1
are intended to provide a renewed focus to celebrate and deliver on our key strengths as an
area and embrace the opportunities of our rural, natural resource-based economy for short term
delivery in the first instance. 
5.2 A short film ‘Thriving in Argyll and Bute’ has been produced to showcase in-year progress for
2024-2025 on some of the actions that were contained in the first ESAP, 2024-2027, see:
Homepage - Invest in Argyll 
6.0 Implications 
Strategic Implications The ESAP 2025-2028 aligns and contributes to the endorsed Argyll
and Bute Economic Strategy 2024-34, Local Outcome Improvement
Plan (LOIP), 2024-2034 and National Strategy for Economic
Transformation (NSET- 10-year duration to 2032).
Consultations, Previous
considerations
The original Economic Strategy and associated ESAP was
developed through a programme of workshop events with internal
staff and external partners during 2023-24. The annual update was
undertaken through an internal workshop as partner actions were
still valid within the 2025-2028 timescale.
Resources Council staff resources and capacity, coupled with input from key
partners and stakeholders, will be required to deliver the strategic
intent articulated in the Economic Strategy Action Plan, 2025-2028.
Prevention SMART actions should support economic growth and wellbeing to
provide effective and efficient interventions across Argyll and Bute to
focus on opportunities and address barriers and challenges. 
Equalities All activities in the ESAP, 2025-2028 will comply with all Equal
Opportunities/Fairer Scotland Duty policies and obligations and the
key principles under which the Argyll and Bute CPP is committed to
promoting equality (see: Argyll and Bute Outcomes Improvement
Plan 2024-2034 | Argyll and Bute Council (argyll-bute.gov.uk)) 
For more information, contact:
Ishabel Bremner, Economic Growth Manager, Argyll and Bute Council / Chair of the ABEP
Tel: 01546 604375 and e-mail: ishabel.bremner@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Argyll and Bute Council Economic Strategy Action Plan 2025-2028

Page 3

3 
Classification: OFFICIAL 
Appendix 1 
Argyll and Bute Council SMART Economic Strategy Action Plan 2025-2028 
(WORKING DOCUMENT)

Page 4

4 
Classification: OFFICIAL  
PEOPLE: Addressing the continuing decline in our economically active
population, improving workforce skills and attracting key workers,
promoting equal access to education opportunity, and supporting job
opportunities in emerging and new industries. 
The SMART actions noted in the PEOPLE tables below: 
• Increase the economically active population by investing in skills
development. 
• Work with partners to enable equal access to education, both
academic and vocational. 
• Focus on STEM education. 
• Promote increased adaptability and skills development for both
existing and new staff including Argyll and Bute Council and local
businesses.

Page 5

5 
Classification: OFFICIAL
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025 Resources Outcome by 2034
1. Council services through the
Argyll and Bute Employability
Partnership (ABEP) (DEG,
Education, DYW) to map out all
support for vocational
education and training
opportunities across all key
sectors to share with schools,
parents and all residents.   
2. ABEP to align with the current
work of the partners on
increasing awareness of
occupational opportunities
across Argyll and Bute Council. 
1. HIE, SE, SDS, UHI
Argyll, UHI, SAMS,
University West of
Scotland, third sector
providers and
employers to assist
the council with this
mapping exercise, as
members of the
ABEP. 
2. HIE to progress with
establishing the new
private sector driven
Economic Forum. 
1. Completion of an online
directory by the ABEP of all
support for vocational
education and training
opportunities, with web
links to relevant
information, by 31st March
2027. 
2. Economic Forum to be
established by 31st March
2026.
1. Online directory is an
ongoing activity. 
2. Prosper workshop
held on 8th May 2025
to take forward an
Argyll and Bute
Economic Forum;
still to be formalised
led by the private
sector. 
1. In-kind support
from all
partners. 
2. Funding
opportunities
for individuals
and skills will be
identified by
web links to
current
support. 
Raised awareness
of all occupational
employment
opportunities for all
ages across Argyll
and Bute.
1. ABEP to work with the Scottish
Qualifications Authority (SQA)
representative on the ABEP to
explore tailored modern
apprenticeship schemes for
areas of skill shortages,
including Planning and
Environmental Health through
investing in council officers
with transferable skills. 
1. More employers to
consider
opportunities to
undertake work
tasters/placements
and apprenticeship
training for adults
aligned to current
funding opportunities
until end 31st March
2026. 
1. Agreement from SQA to
increase tailored modern
apprenticeship schemes for
areas of skill shortages, such
as Planning and/or
Environmental Health aby
31st March 2028. 
2. Current funding work
taster/placement caseloads
available to employers to be
committed and spent by 31st
March 2026.
1. Ongoing activity. 
2. Ongoing activity. 
1. Use existing UK
Shared
Prosperity
Fund and No
One Left
Behind (NOLB). 
2. Council to
invest to save
to alleviate the
skills gap with
appropriate /
improved
access to the
Apprenticeship
Levy funding.
Sustained work
taster placements
and created Adult
Apprenticeship
schemes to address
critical Argyll and
Bute Council skills
shortages.

Page 6

6 
Classification: OFFICIAL
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025 Resources Outcome by 2034
1. DYW, Education and
Economic Growth to
focus on the
increasing the range
of Foundation
Apprenticeships for
senior pupils across
Argyll and Bute
schools aligned with
industry demand. 
1. SDS to assist in increasing the
range of Foundation
Apprenticeships with
sustainable job opportunities. 
2. Check all activity with partners
on the Argyll and Bute
Employability Partnership
(ABEP). 
3. Scottish Government and the
Scottish Funding Council to
reduce the necessary class size
due to rurality for Foundation
Apprenticeship delivery. 
1. Council to increase the
range of Foundation
Apprenticeship
programme(s) available by
10% by 31st March 2028 to
alleviate some skills
shortages. 
2. Council to increase the
uptake of senior phase
pupils undertaking
Foundation Apprenticeship
by 15% by 31st March 2028.
1. Ongoing activity.  1. Council to
invest to save
to alleviate the
skills gap with
appropriate /
improved
access to the
Apprenticeship
Levy funding.
A greater range of
Foundation
Apprenticeship
schemes available
across all Argyll and
Bute schools to
address training and
employment within
key existing and
emerging sectors. 
1. Economic Growth to
liaise with SDS and
HIE to focus on the
delivery of Graduate
Apprenticeships for a
variety of occupations
across Argyll and Bute
aligned with industry
demand. 
1. SDS and HIE to work with
Economic Growth to
encourage industry
recruitment of Graduate
Apprenticeships aligned to
funding opportunities. 
2. Check all activity with partners
on the Argyll and Bute
Employability Partnership
(ABEP). 
3. HIE to conclude the delivery of
the Graduate Placement
programme funded by the UK
Shared Prosperity Fund.
1. 10% increase in the uptake
of Graduate
Apprenticeships supported
by Argyll and Bute
businesses across a variety
of occupations by 31st
March 2028. 
2. 2 out of 13 Graduate
Apprentices employed by
12 enterprises under the
HIE Graduate Placement
Programme funded by the
UK Shared Prosperity Fund
to be concluded by the end
of March 2026.
1. Ongoing activity. 
2. 11 Graduate
Apprentice
Placements concluded
through the HIE
Graduate Placement
Programme by end of
2024/25.
1. Council to
invest to save
to alleviate the
skills gap with
appropriate /
improved
access to the
Apprenticeship
Levy funding. 
2. UK Shared
Prosperity
Transition Fund
2025/26.
Sustain and grow
the number of
Graduate
Apprenticeship
schemes available
across Argyll and
Bute within existing
and emerging
sectors.

Page 7

7 
Classification: OFFICIAL
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025 Resources Outcome by 2034
1. Focus on improving
the skills of existing
staff and the
recruitment of new
council officers
equipped with
transferable skills
that can move across
teams to support
funded
projects/themes
and/or council
priorities. 
2. Economic Growth
support to
businesses through
Business Gateway
and Employability
teams using UK
Shared Prosperity
Fund monies.
1. HIE and SE to share approaches
to business interventions to
complement local authority
delivery. 
1. 5% increase in the
recruitment of staff with
transferable skills. 
2. Achieve outcomes associated
with UK Shared Prosperity
Fund interventions by end of
March 2026. 
(For all businesses supported,
increase in turnover by 30%
and increase in job creation
by 26% - see Overarching
Economic Key Outcomes
table below). 
1. Ongoing activity. 
2. The Council’s
Employability Team
supported:
• 68 unemployed’
economically
inactive residents
into work
placements with
48 employers,
where 62% have
secured
employment post
work placement.
• 60 unemployed’
economically
inactive and 26
low-income
residents into
training where
42% are in
employment post
training. 
Invest to save. 
UK Shared
Prosperity
Transition Fund
2025/26.
Skills development
mainstreamed for
both existing and
new council staff
and local business
staff to better
capitalise on
changing economic
opportunities.

Page 8

8 
Classification: OFFICIAL
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. On approval of the
Rural Skills
Accelerator
Programme (RSAP)
Outline Business
Case, ensure 3 of the
4 Full Business Cases
are concluded
aligned to the Rural
Growth Deal (RGD)
projected delivery
timeframe for RGD
projects. 
2. Creation, co-delivery
and ongoing KPI
monitoring of the
STEM Hub South
(Dunoon), including
mobile and outreach
activity. led by the
Council’s Economic
Growth and
Education services. 
3. Assist the delivery of
the STEM Hub North
at SAMS through in-
kind staff support
from Economic
Growth and
Education services.
1. SAMS to manage the delivery
of the STEM Hub North,
including mobile and outreach
activity. 
2. HIE to manage and deliver the
Business Leadership Skills
programme, part of the RSAP. 
3. UHI Argyll to manage and
deliver the enhancement of
the college accommodation in
Lochgilphead. 
1. a) 3 of the 4 Full Business
Cases for the RSAP approved
by both governments by the
end of March 2027. 
b) HIE to commence and start
the delivery of the Business
Leadership Skills Programme
from April 2026. 
2. Co-delivery of the STEM Hub
South by Economic Growth
and Education by the of
March 2027. 
3. Delivery of the STEM Hub
North by SAMS through
liaison with Economic
Growth, Argyll and Bute
Council by the end of March
2028.
1. 3 of the 4 Outline
Business Cases for the
RSAP have been
approved. 
2. Staged approach to the
creation of the STEM
Hub South continues. 
3. Approach for the STEM
Hub South shared with
the STEM Hub North to
enable shared learning.
Building secured for
future STEM hub at
SAMS.
RSAP – RGD
funding (£7m),
plus Clyde
Mission &
Crown Estate
Scotland
(digital
connectivity)
and Council
funding
(£762,500).
STEM education
and skills has
enabled a digitally
driven pathway to
learning
opportunities.

Page 9

9 
Classification: OFFICIAL
PEOPLE: Reducing Barriers to work through Employability
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025 Resources Outcome by 2034
1. Economic Growth to prepare the
Argyll and Bute Employability
Partnership (ABEP) Annual
Investment Plan for 2025/26 based
on successful bids aligned on a
scoring matrix. 
2. Economic Growth to present a paper
on a truncated ABEP Delivery Plan,
prepared by ABEP members, for
endorsement by the Community
Planning Partnership Management
Committee. 
3. Focus on all-age employability
support and tackling child poverty
with a 'no wrong path' approach to
prepare the required Annual
Investment Plan for No One Left
Behind (NOLB) Scottish Government
funding, complete with details of
delivery interventions by the council
and partners. 
4. Joint messaging about the benefits
of investment in early prevention of
poor health and how improving
people’s health and wellbeing
supports the local workforce and
reduces health care costs over the
medium and longer terms.  
1. Partners, in particular
members of the ABEP,
to deliver all age and
child poverty
interventions, funded
by the NOLB for
2025/26. 
2. Partners, in particular
members of the Argyll
and Bute
Employability
Partnership, to deliver
all age and child
poverty interventions,
funded by the NOLB
for 2025/26. 
3. To utilise levers for
direct investment to
support wellbeing
outcomes. 
1. ABEP truncated Delivery Plan
and full Annual Investment
Plan to be endorsed by the
CPP Management Committee
by the end of September
2025. 
2. Council and all delivery
partners to achieve in-year
spend and outcomes detailed
in the Annual Investment
Plan by the end of March
2026.. 
3. Measurement of wellbeing
outcomes, such as individuals
supported to move into
sustainable employment
through case studies from
ABEP members. 
4. Developing a pilot approach
to place making that
incorporates public health
outcomes. This is a
partnership initiative
supported by Hub North with
NHS Highland as a key
partner. 
1. Annual Investment
Plan 2025/26
prepared by the
Employability Team,
Economic Growth
with input from
ABEP. 
2. Workshop delivered
by ABEP on a
truncated ABEP
Delivery Plan on 20th
May 2025. 
3. With Scottish
Government NOLB
funding the
Employability Team,
Economic Growth
and third sector
delivery partners
supported 472
participants in
2024/25. 
4. Hub North proposal
now being
considered by ELT
and NHS Highland
prior to member
approval. 
Scottish
Government
NOLB funding.
Deliver the
employability
agenda, with
embedded Fair
Work First
principles to assist
people with
multiple barriers
into sustainable
employment.

Page 10

10 
Classification: OFFICIAL 
PLACE: Investing in our towns, rural and remote rural communities,
including our islands and peninsulas, to attract new people and
businesses, pursuing external funding opportunities, investing in critical
economic infrastructure such as housing, land for business development,
reuse of land and buildings for community benefit, digital connectivity
and transport (principally roads, ports and ferries). 
The SMART actions noted in the PLACE tables below:
• Secure future investment from cross sector partners and external
funding streams into our towns, rural and island communities.
• Recognise the strengths of community resilience across Argyll and
Bute.
• Work with strategic partners to support communities in the
development and facilitation of transformational regeneration
projects including community ownership of assets and wealth
creation.
• Increase focus on areas of opportunity through better place
making.

Page 11

11 
Classification: OFFICIAL
PLACE: Better Place Making
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by
2034
1. Continued development and
delivery of built heritage
investment schemes. 
2. Continued delivery of the
vibrant and living spaces
projects funded through the
UK Shared Prosperity
Transition Fund, 2025/26 
3. Continued delivery of the
Community Regeneration
Partnership funding for
project activity throughout
2025/26. 
4. Continue delivery of Rural
Growth Deal programme and
draw down of funding. 
Complete FBCs necessary to
enable endorsement of
projects by central
governments. 
5. Further promotion of the
#ABplace2b campaign. 
1. Establish a
collaborative
partnership
between central
governments,
Argyll and Bute
Council, CPP
partners,
communities and
funders. 
1. a) Complete Lochgilphead CARS
programme by end June 2026;
Complete Helensburgh CARS
programme by end June 2026;
Secure £1.8m funding for a
Tarbert Heritage Regeneration
Scheme by end March 2026.
b) Delivery of new artworks in
Helensburgh Outdoor Museum. 
2. Delivery of the 8 Vibrant and
Living Spaces projects with a
total investment of £292,290.24
by the end of March 2026. 
3. Commence all Community
Regeneration Partnership
projects by the end of March
2026. 
4. Rural Growth Deal (RGD) signed
10th March 2025 with ongoing
compliance, such as the drawn
down of funding, for the
remaining 9 financial years of the
RGD. 
5. Continue Love Local promotion
and increase #ABplace2b
followers by 10% from its launch
to the end of March 2026. 
1. Ongoing activity that
is on track. 
2. Ongoing activity.
Funding fully
committed. 
3. Ongoing activity. On
track. 
4. Signing of the Rural
Growth Deal in
Rothesay by Argyll
and Bute Council,
the UK Government
and the Scottish
Government took
place on 10th March
2025. 
5. Ongoing activity. On
track. 
CARS multi-annual
funding. 
UK Shared Prosperity
Transition Fund for
Vibrant and Living
Spaces projects. 
Community
Regeneration
Partnership
Programme, £20m. 
Rural Growth Deal
circa £70m investment
over 10 years. 
Scottish Government
Place based funding. 
Historic Environment
Scotland, National
Lottery Heritage Fund,
Crown Estate and Rural
Tourism Infrastructure
Fund strategic
investments. 
HIE capital funding. 
Creation of a
distinct sense
of place
through the
delivery of an
outstanding
built
environment
making our
towns, rural
and island
communities
across Argyll
and Bute
attractive
places to live,
work, visit and
invest in.

Page 12

12 
Classification: OFFICIAL
PLACE: Better Place Making (continued)
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
6. Secure future investment from
cross sector partners and
external funding streams
including both the Scottish and
UK Governments. 
7. Dissemination and delivery of
the Community Led Local
Development (CLLD) Fund for
2025/26 through the Argyll and
the Islands CLLD Local Action
Group (LAG) supported by the
council as the Accountable
Body. 
2. New partners to
become
members of a
renewed CLLD
Argyll and the
Islands Local
Action Group for
2025/26. 
6. Continue to lobby and influence
the Scottish and UK
Governments and key partners
for cross-sectoral place-based
funding. 
7. All CLLD Fund spend and
outcomes for 2025/26 to be
realised by the end of March
2026. 
6. Ongoing activity.
Community
Regeneration
Partnership funding
to be announced in
November 2025. 
7. £599k of CLLD Fund
support to 20
projects during
2024/25 against a
total project cost of
£793k, leveraging in
£194k of match
funding. 
For every £1 invested
in CLLD Projects in
2024/25, the social
value return was
£5.11. 
Private sector
investment. 
CLLD Fund from
the Scottish
Government for
2025/26.
Creation of a
distinct sense of
place through the
delivery of an
outstanding built
environment
making our towns,
rural and island
communities across
Argyll and Bute
attractive places to
live, work, visit and
invest in.

Page 13

13 
Classification: OFFICIAL
PLACE: Increasing Community Resilience and Wellbeing through Identifying and Delivering Income Streams
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Adopt a Community Wealth
Building (CWB) approach / CWB
Action Plan (as per proposed CWB
(Scotland) Bill to ensure the
economic success of Argyll and
Bute is based on a wellbeing
economy. 
2. Council to continue to work and
engage with partners and
communities to create the
opportunity for the use of
community assets, empty spaces
and co-production through the
application of Place Based
Wellbeing Principles such as
accessibility and inclusion. 
3. Partnership working with the
Community Planning Partnership
and Health and Social Care
Partnership prevention agenda. 
4. The Empty Business Property
Grant Scheme will seek to support
the owners and prospective
tenants of empty business
properties to return these to
productive use with a view to
enhancing the look, feel and
vitality of our places, growing
businesses and job opportunities,
and attracting inward investment.
1. HIE, SE, third sector
partners (including
the Improvement
Service) and external
funders engage with
the council and other
stakeholders to
maximise the
wellbeing economy
agenda for Argyll and
Bute. 
2. Communities to
develop shared
management of civic
spaces and natural
assets. 
3. Input from
community councils
and development
trusts to support
community
developments and
co-production.   
4. Publish and
implement actions of
the Community
Wealth Strategy. 
1. Establish a multi partner
and cross council
departmental approach to
CWB to prepare a CWB
Action Plan. 
2. Increase the number of
community owned
buildings and land assets
by 5% including a renewed
focus on job creation, by
the end of March 2028. 
3. Embed appropriate Place
and Wellbeing Principles,
including the prevention
agenda, into project
delivery. 
4. Continue to lobby Scottish
Government to maintain
budgets for community led
projects e.g. Community
Led Local Development
(CLLD) Fund, Regeneration
Capital Grant Fund (RCGF),
Scottish Land Fund, and
Rural Tourism
Infrastructure Fund (RTIF)
from 2025/26 onwards
1. CWB CPP Working
Group formed with
members from the
Council’s Economic
Growth and
Community
Development
Teams, TSI Argyll,
NHS Highland and
HIE. 
2. Request for CWB
staff resource in
Argyll and Bute
Council officer
response to the
CWB (Scotland Bill) –
submitted 23rd May
2025. 
3. Examining
prevention activities
as part of the
budget process. 
4. RCGF, Place based
funding, RTIF,
Islands
Infrastructure Fund,
CLLD fund all
reinstated. 
UK Government
Asset Transfer
fund/UKSPF. 
Scottish
Government
Community
Empowerment –
Asset Transfer
Fund. 
Empty Business
Property Grants
funded from NDR
income.
Greater
community
resilience and
wellbeing has
created a better
sense of belonging
and prosperity
through the access
to external
investment that
has driven
transformational
opportunities,
community
ownership and
innovation.

Page 14

14 
Classification: OFFICIAL
PLACE: Improving Connectivity
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions 
2024-2025
Resources Outcome by
2034
1. Further to the Strategic
Transport Projects
Review 2 (STRP2)
response, continue to
lobby the Scottish
Government for a
permanent and fully
funded solution for the
Rest and Be Thankful. 
2. Prepare and deliver an
Argyll and Bute Local
Transport Strategy that
identifies the key local
transport priorities. 
3. Lobby and influence the
UKG, SG, BT and private
contractors to deliver the
R100 Programme moving
into Project Gigabit 2030. 
4. To map phase 1 mobile
phone coverage at an
individual premises level. 
5. Prepare an Argyll and
Bute Active Travel
Strategy to achieve a
healthier and more
productive workforce. 
1. Continue to lobby the
Scottish Government
for a permanent and
fully funded solution
for the Rest and Be
Thankful. 
2. Continue to lobby for
increased active
travel, public
transport, airport, air
service, ferry and
ports infrastructure
investments. 
3. Industry and public
sector collaboration
to secure basic
critical infrastructure.
Key partners:
• Scottish
Government
• UK Government
• Transport
Scotland
• HITRANS
• BT Openreach
• Virgin
• Digital Scotland
• SPT.
1. Full commitment by
Scottish Government to
deliver a fully funded
solution for the Rest and Be
Thankful. 
2. Approve and publish an
Argyll and Bute Local
Transport Strategy that
identifies the key local
transport priorities. 
3. R100 achieved with 85% of
premises with potential
access to modern ultrafast
broadband speeds; 85%
coverage of 4G across Argyll
and Bute. 
4. Conclude the mapping of
mobile phone coverage by
December 2025. 
5. Approve and publish an
Argyll and Bute Active
Travel Strategy. 
1. Ongoing activity. Ground
investigation works for
preferred solution ongoing;
round table discussions on
impacts of works scheduled. 
2. Ongoing activity. Local
Transport Issues Paper
approved for public
consultation; Hi-Trans
Regional Transport Strategy
approved. 
3. Ongoing activity working with
BT Openreach. Provisional
allocation of £200m UK
Government funding for
Argyll and Bute area, subject
to UK Government
confirmation and rapid
delivery and positive support
by Argyll and Bute Council. 
4. Mobile phone coverage
mapping nearing completion
with data now released for
most of Argyll and Bute
Council area. 
5. Active Travel Strategy out to
public consultation.
Lobby, influence
and invest.
Working with
Industry and
public sector
partners to secure
basis critical
infrastructure. 
• Scottish
Government
• UK
Government
– previous
levelling up
agenda
monies and
new future
schemes
• Transport
Scotland
• HITRANS
• SPT
• BT Openreach
• Virgin
• Digital
Scotland
• CMal/CalMac
• Scotrail
• Bus
companies.
Existing routes
to market
(roads, rail,
ferries, ports
and air) and
local
employment
opportunities
are secured
through
increased
investment in
our critical
transport and
digital
infrastructure.

Page 15

15 
Classification: OFFICIAL
PLACE: Housing Emergency
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Reflect the endorsed
Housing Emergency
Action Plan (with a focus
on increasing the supply
of key worker housing).in
the annual update of the
local Housing Strategy. 
2. Complete mapping of
second homes and short-
term lets to inform the
delivery of Planning
Control Zones (PCZs). 
3. Deliver the 2 Strategic
Development
Frameworks for
Tobermory to Dalmally
Growth Corridor (TDGC)
and Helensburgh &
Lomond Growth Area
(HLGA). 
1. Ongoing
engagement and
delivery of specific
actions in the
Housing Emergency
Action Plan will
involve the
following partners:
• Scottish
Government.
• CPP partners,
including HIE.
• Housing
Associations.
• Private sector
builders.
• Highlands and
Islands
Economic
Partnership.
• Community
Housing Trusts. 
1. Publish Housing Emergency
Action Plan outcomes by the of
June 2025. 
2. 20 key worker houses by end of
March 2028. (10 completed by
May 2025). 
3. Approve PCZs informed by up-
to-date housing data by end of
March 2028. 
4. Approve the 2 Strategic
Development Frameworks for
TDGC and HLGA. To be
published as part of the
Proposed Local Development
Plan 3, potentially January
2028. 
5. Deliver the Community
Regeneration Partnership Fund
housing related projects.
1. Outcomes published.
Alignment of the Housing
Strategy and Housing
Emergency Action Plan has
been completed. Work
ongoing on identified
actions. Officer Housing
Delivery Group established
focused on releasing sites
for housing. 
2. Site works completed for
Rockfield Worker Housing
site for 12 units. 
3. Mapping of second homes
and short term lets
completed. This is being
used to inform potential
Planning Control Zones
location in Argyll and Bute
Council area. 
4. Consultants engaged for
both Strategic
Development Frameworks
about to commence public
consultation on options. 
5. Awaiting UK Government
announcement of
Community Regeneration
Programme projects.
1. Lobby Scottish
and UK
Governments
for additional
flexibility and
funding. 
2. Strategic
Housing Fund. 
3. £450k for
Strategic
Development
Frameworks of
TDGC and HLGA.
Consultants now
appointed for
both
frameworks). 
4. £5m of housing
funding from
the Community
Regeneration
Fund, UK
Government
(awaiting UK
Government
approval). 
Affordable homes
of all tenure have
been built or
brought back in to
use to meet the
needs of our
communities
including
attracting new
economically
active residents to
Argyll and Bute to
take up
employment
opportunities and
to help expand
established local
businesses and /
or to establish
new businesses.

Page 16

16 
Classification: OFFICIAL  
PLANET: Delivering net zero and improving our biodiversity by
supporting the sustainable growth of clean energy production (i.e.
hydro, solar, wind and biomass), woodland, peat and marine habitat
restoration, encouraging green industries to develop in our area,
nature-based solutions and community ownership. 
The SMART Actions noted in the PLANET tables below:
• Achieve net zero through increased clean energy production,
forestry expansion, and marine habitat restoration.
• Embrace clean energy opportunities and work to provide better
local outcomes, including job retention and creation.
• Develop low-carbon infrastructure to enable alternatives to private
transport including active travel, better digital connectivity, and
sustainable housing.
• Foster nature-based solutions for increased climate change
resilience and biodiversity enhancement.
• Support emerging sustainable industries like seaweed farming,
marine research and green energy.
• Unlock the potential of the marine economy to create sustainable
economic growth opportunities across Argyll and Bute.

Page 17

17 
Classification: OFFICIAL
PLANET: Delivering Net Zero by 2045 through Economic Actions 
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Prepare a Local Area
Energy Plan for Argyll and
Bute. 
2. Work with our Community
Planning Partners,
community groups, trusts
and bodies to delivery
environmental, carbon
neutral, projects. 
3. Develop low-carbon
infrastructure to enable
alternatives to private
transport including active
travel, better digital
connectivity*, and
sustainable housing**.
(*digital connectivity see
PLACE: Improving
Connectivity actions and
**sustainable housing see
PLACE: Housing
Emergency). 
1. Strong collaboration
required from all
Community Planning
Partner stakeholders and
the private sector –
community climate hubs. 
2. Argyll and the Isles Coast
and Countryside Trust
(ACT) leading on the
delivery of an expanded
North Atlantic Rain
Forest and expanded
restoration of peat bogs. 
3. Strategic partners to
lobby for funding, build
political and community
support to delivery Net
Zero. 
1. Deliver a Local Area Energy
Plan (LEAP) for Argyll and
Bute by December 2026. 
2. Ensure economic
opportunities through the
production of a Regional
Climate Change Strategy
and Action Plan by the end
of March 2028. 
3. a) Adoption of an Active
Travel Strategy by the end
of March 2028. 
b) Preparation of the full
business case by Hub North
for the West Coast UAV
Logistics and Training Hub
at Oban Airport by March
2027.
c) Continue the delivery of
the Home Energy Efficiency
Programme for Scotland
(HEEPS) and new build
(energy efficient) social
housing 
(*for target, 20 key worker
houses, see PLACE: Housing
Emergency).
1. Discussions ongoing
with Hub North on
securing funding for
LAEP. 
2. Work ongoing by
Commercial Services. 
3. a) Active Travel Strategy
out for public
consultation.
b) Oban Airport Business
Park moving to
development stage
following business case
approval and securing
additional TIF funding.
Awaiting Community
Regeneration
Programme funding
announcement. 
c) HEEPs ongoing work
secured a £2.2m grant
for this financial year.
ECO4 status secured. 
Funding via the
UK and Scottish
Governments
Net Zero
agenda. 
Renewables,
forest
expansion and
energy
conservation. 
Private sector
community
benefits.
Argyll and Bute
established as a
leading low carbon
economy and
taking best
advantage of our
natural capital.

Page 18

18 
Classification: OFFICIAL
PLANET: Expanding Green / Clean Energy Production
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Lead efforts to achieve net
zero through clean energy
production. 
2. Consideration of green
energy production on Islay
to unlock economic
opportunity.  
3. To continue to lobby SSE
networks for grid
improvements to and from
Islay to take advantage of
new offshore wind
opportunities and assist in
the decarbonisation of the
Islay economy; and to
lobby SSE Networks and
Scottish Power Energy
Networks for better grid
connectivity for
communities experiencing
grid constraints. 
1. HIE and SE to support
carbon sequestration
activity and relevant
funding. 
2. Community groups to
maximise returns for clean
energy community benefits. 
3. Argyll and Bute Renewables
Alliance (ABRA) and other
relevant partners to support
the sustainable growth of
the renewables and clean
energy sectors across Argyll
and Bute. 
4. To sign off by 2027 the
Hebrides and Orkney Whole
System Uncertainty
mechanism (HOWSUM) to
act as a framework for a
modern fit for purpose
electricity distribution
network across our island
communities.
1. Increasing clean energy
production by 500 MWs. 
2. Completion of Rural Growth
Deal full business case for
‘Creating a low carbon
economy on Islay’ by March
2027. Continue to bid for
carbon neutral funding for
Islay. 
3. To continue to lobby
OFGEM and network
operators to create SMART
use of the grid and approve
grid improvements –
ongoing. 
4. Increase community benefit
returns by 10% by 2027.
1. Ongoing activity 13 on
shore wind farms
submitted 24/25 plus
several battery storage
schemes. 
2. Re-examining Islay
Business case following
feedback from
Governments. Carbon
Neutral funding bids
submitted annually. 
3. Argyll and Bute Council
has responded to
several Government
consultations on the
grid investment. 
4. Draft Economic and
Social Charter being
prepared for
committee. 
Community benefits
being monitored. SSEN
Argyll Local fund now
live.
UK and
Scottish
Government
funding. 
Private sector
investment.
Deliver clean
energy sectoral
opportunities and
infrastructure
across Argyll and
Bute.

Page 19

19 
Classification: OFFICIAL  
PROSPERITY: Creating higher wage opportunities, seizing opportunities
in the net-zero economy, improving productivity and innovation through
increasing business efficiency including  the use of digital technology,
empowering communities through ownership and wealth creation,
sustaining public services, promoting the marine and green economies,
enabling the sustainable growth of key sectors such as food and drink
together with revitalising the tourism and hospitality sectors and
supporting the growth of the creative industries. 
The SMART Actions noted in the PROSPERITY tables below:
• Capitalise on net-zero opportunities for green jobs and improve
living standards.
• Focus on productivity improvements through digital technology.
• Empower the public, private and third sectors to provide services,
participate in shared management of civic spaces and generate
income.
• Revitalise our key sectors such as the tourism and hospitality
industry.
• Leverage natural and cultural assets to drive sustainable business
growth and overall economic growth.

Page 20

20 
Classification: OFFICIAL
PROSPERITY: Supporting Business Start-up and Growth
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Lobby and influence the UK
Government and the Scottish
Governments on future funding
decisions to continue business
support funding across local
government and partner agencies.
Council Officer Funding Group
established to collate information on
existing and future funding that will
facilitate lobbying. 
2. Influence and facilitate business
creation, retention and growth
through tailored support by teams
and funding within Economic Growth,
such as Business Gateway and the
Rural Tourism Infrastructure Fund
(RTIF) respectively. and other council
departments with sectoral remits. 
3. Encourage organisations to consider
alternative business models, with a
particular focus on succession
planning. Business Gateway signpost
relevant information and resources. 
4. Focus on business productivity
improvements through digital
support and reviews through current
Expert Help Business Gateway
interventions, funded by the UKSPF
Transition funding for 2025/26.
1. Collaborative
working by UK and
Scottish
Governments
working with local
authorities through
Scottish Local
Authorities
Economic
Development
(SLAED) group. 
2. Complementary
business start-up
and growth support
from HIE and SE. 
3. Complementary
support on the
adoption of
alternative business
models to assist
with succession
planning and
business retention
from HIE and SE. 
4. Complementary
support on business
productivity
improvements from
HIE and SE.
1. Ongoing lobbying activity
on future business
support funding with
external partners such as
SLAED. 
2. Commit and spend all
business support grants
funded by the UKSPF by
the end of March 2026,
which includes the UKSPF
transition funding for
2025/26. 
3. HIE to provide 2 cases
studies by the end of
March 2027 to
demonstrate the adoption
by local businesses of
alternative business
models. 
4. Publish all outcomes from
the digital support and
reviews and Expert Help
by end of June 2026.
1. Between June 2023
and March 2025
Business Gateway,
Economic Growth,
delivered a
programme of
additional support
worth £516,521 fully
funded through the
UKSPF. 165 unique
businesses were
supported, via:
• 87 small business
development
grants
• 75 start-up grants
• 16 training, trade
fair, accreditation
or digital grants
• 9 expert help
• 6 participants on
intensive business
support
programme. 
2. Impact of UKSPF – see
infographic in
Economic Growth
Activities and
Outcomes paper, EDI
Committee, 11th
September 2025..
UK
Government
funding (RGD
& Community
Regeneration
Partnership
Funding) and
Scottish
Government
funding (RGD,
Business
Gateway and
HIE).
Argyll and Bute
established as the
natural choice for
ambitious,
emerging,
productive and
innovative new
SMEs and
industries to grow
and flourish.

Page 21

21 
Classification: OFFICIAL
PROSPERITY: Supporting Key Sectors and Productivity
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Lobby and influence the UK
Government (e.g. UKSPF successor
programme) and the Scottish
Government (e.g. CLLD Fund) future
funding decisions to support our key
sectors such as tourism, food and drink,
creative industries, renewables and
marine with multi-annual funding
models. 
2. Promote our creative industries and
their expansion across Argyll and Bute.
Approve in principle, the hosting of the
Royal National Mod Oban 2028. 
3. Progress the development of the
Kilmory Business Park Phase 2, Colgrain
Business Park and Oban Airport
Business Park. 
1. Collaborative
working by UK and
Scottish
Governments with
local authorities. 
2. CHARTS to attract
external funding
and support the
sustainable growth
of the sector
including Gaelic
culture as a means
to boost business
growth. 
3. Relevant private
sector companies;
HUB North; Scottish
Future Trust (SFT),
HIE and SE to
support the
Council’s
Procurement Team
to publicise the
supply chain
opportunities from
Kilmory Phase 2 and
Oban Airport
Business Park.
1. Secured sectoral funding
for 2025/26 and beyond
through external funding
sources. 
2. Deliver the Kilmory
Business Park, Phase 2 by
early of 2025/26; finalise
the Colgrain Business Park
Full Business Case by the
end of March 2026;
delivery Oban Airport
Business Park by spring
2027. 
1. Council Officer
Funding Group
established to collate
information on
existing and future
funding to facilitate
lobbying. 
2. CHARTS awarded
development
funding from
Creative Scotland
during 2024/25
which may lead to
them achieving
Regularly Funded
Organisation status. 
3. Kilmory Business
Park 2 under
construction. Site
investigation works
ongoing for Colgrain
Business Park. Oban
Business Park
approaching
development phase. 
UK
Government
funding (RGD
&
replacement
programme
for levelling
up) and
Scottish
Government
funding (RGD,
CLLD &
RCGF); Crown
Estate
Scotland; Tax
Incremental
Finance (TIF)
model (Argyll
and Bute
Council),
Historic
Environment
Scotland
(HES) and
Heritage
Lottery Fund
(HLF);
Creative
Scotland; HLF. 
Argyll and Bute
established as the
natural choice for
ambitious,
emerging,
productive and
innovative new
SMEs and
industries to grow
and flourish across
the key sectors
such as tourism,
food and drink,
creative
industries,
renewables and
marine.

Page 22

22 
Classification: OFFICIAL
PROSPERITY: Supporting Key Sectors and Productivity (continued)
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
4. Create a world class visitor destination
through the delivery of Rural Growth
Deal projects such as the Rothesay
Pavilion and Kintyre Seasports. 
5. Facilitate private sector investment in
tourism accommodation and facilities. 
6. Promote the strengths and
opportunities of Argyll’s two current
whisky regions, Islay and Campbeltown.
4. Argyll and the Isles
Strategic Tourism
Partnership to
work collectively to
support the
sustainability and
growth of the
sector. 
5. HIE to engage with
a range of inward
investors with a
focus on the
distilling sector.
3. Complete the restoration
of the Rothesay Pavilion
with the creation of 14
FTEs and deliver the
Kintyre Seasports project,
both by end of March
2027. 
4. Expected to facilitate the
leverage of £0.5bn of
private sector capital
investment in our key
sectors by March 2028. 
5. To facilitate the
sustainable growth of
Argyll and Bute’s current 2
distinct whisky regions
(Islay and Campbeltown)
that maximises local
supply chain benefits by
the end of March 2028. 
4. New Strategic
Tourism Partnership
Strategy published
August 2025. 
5. Rothesay Pavilion on
track for completion.
Kintyre Full Business
Case being
developed. £200k
secured for planning
start. 
6. Ongoing activity with
several new
distilleries on site
and bonded
warehouses under
construction. 
UK
Government
funding (RGD
&
replacement
programme
for levelling
up) and
Scottish
Government
funding (RGD,
CLLD &
RCGF); Crown
Estate
Scotland; Tax
Incremental
Finance (TIF)
model (Argyll
and Bute
Council),
Historic
Environment
Scotland
(HES) and
Heritage
Lottery Fund
(HLF);
Creative
Scotland; HLF. 
Argyll and Bute
established as the
natural choice for
ambitious,
emerging,
productive and
innovative new
SMEs and
industries to grow
and flourish across
the key sectors
such as tourism,
food and drink,
creative
industries,
renewables and
marine.

Page 23

23 
Classification: OFFICIAL
PROSPERITY: Empowering Communities (public, private and third sectors) to Increase their Resilience, Provide Services and Generate Income
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by 2034
1. Through collaborative and
partnership working ensure
the CWB approach is
embedded in the delivery of
all council projects. 
2. Engage and align with the
Highlands and Islands
Regional Economic
Partnership (HIREP)
Community Benefit sub-
group activity and proposed
outcomes. 
3. Further to a detailed 12-
week consultation period in
the final quarter of 2024/25,
collate a Visitor Levy
Consultation Report for
elected member
consideration. 
4. Focus on addressing areas of
deprivation, particularly in
Dunoon, Rothesay and
Campbeltown, by fostering
community partnerships. 
1. The CPP, and other
key cross sector
stakeholders, to
support the delivery
of the CWB
approach, with a
focus on the recent
CPP research on
CWB. 
2. HIE to support the
delivery of
community-led
projects to support
resilience and
create local wealth
generating
opportunities. 
3. Key partners across
the Highlands and
Islands are members
of the HIREP
Community Benefit
sub-group with a
focus on benefits
pertinent to their
own geographical
areas as well as the
Highlands and
Islands.
1. Collective CWB approach
embedded in all council
project/ programme delivery. 
2. Assist in the delivery of the
community benefit proposals
developed by HIREP, with a
focus on Argyll and Bute
communities. 
3. Consultation completed. To
reach a decision on whether
to introduce an Argyll and
Bute Visitor Levy by the early
autumn 2025. 
4. Identify clear economic
functions for Dunoon,
Rothesay and Campbeltown
by March 2027. Working with
BIDs and CDTS in particular,
with Dunoon and Rothesay to
deliver improved buildings,
remove dereliction, and
public realm enhancements
1. Tobermory Business Site
phase 2, Port Ellen
Community Hub, Colonsay
and Tiree Business units
completed. 
2. Ongoing activity active
member of HIREP. 
3. Supporting potential
Dunoon Data Centre bid for
AI Growth status across
Argyll and Bute. 
4. Ongoing activity. Major
capital works being
progressed for Rothesay
and Dunoon. Focus on
assisting SMEs to establish
businesses in both areas. 
.
UK
Government
and Scottish
Government
funding. 
Private sector
community
benefit
contributions. 
Community
Benefit
funding
disseminated
through
working with
and HIREP. 
Communities are
equipped to
improve their
resilience through
achieving local
economic
outcomes and
social benefits that
retain economic
prosperity locally.

Page 24

24 
Classification: OFFICIAL
PROSPERITY Maximise the Potential of the Marine Economy
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Progress on Actions
2024-2025
Resources Outcome by
2034
1. Unlock the potential sites for
development with direct
water access. 
2. Support SMEs (through the
Business Gateway service) to
access supply chain
opportunities aligned to the
marine economy. 
3. Provide support for new
products including
renewables linked to the
RGD funded Marine Industry
Training Centre (MITC) e.g.
hydrogen, biofuels,
bioplastics and to the
Machrihanish Innovation
Centre (MIC). 
4. Ensure that the Rural Growth
Deal (RGD) Marine
Aquaculture Programme
(MAP) delivers benefits for
the whole marine industry
and supports the expansion
of new industries such as
seaweed farming. 
5. Unlock the potential of the
North Lorn Port. 
1. HIE, SE, the Loch Lomond & the
Trossachs National Park Authority
and Crown Estate Scotland are key
partners to unlock potential sites. 
2. HIE and SE to support SMEs to
access supply chain opportunities.  
3. HIE, in partnership with SAMS
supports marine sector growth
through:
a) HIE led development of Phase 2
of the European Marine Science
Park, “Camas House”.
b) HIE led development of the
business cluster through
development and delivery of a
strategy marketing plan. 
4. HIE, in partnership with the
council, SAMS, UHI, UHI Argyll and
University of Stirling, to support
marine economic opportunities
realised through the MAP,
specifically:
a) RGD – MAP – SAMS led Centre for
Seaweed and Shellfish Innovation and
Development (CSSIDe).
b) RGD – MAP – Argyll UHI led Marine
Industry Training Centre (MITC).
c) RGD – MAP – Uni of Stirling-
Machrihanish Innovation Centre
(MIC).
1. Site options appraisal and
feasibility work completed by
end of March 2027. 
2. Supply chain opportunities
realised and promoted
through preparation of up to
5 case studies. 
3. a) Completion of Camas
House, European Marine
Science Park (EMSP) Phase 2
during 2025/26.
b) Growth in the number of
marine organisations at the
EMSP by 5%.
c) CSSIDe business case
completed; CCSIDe design
development undertaken by
the end of March 2027. 
4. a) MITC full business case
completed; MITC design
development undertaken by
the end of March 2027.
b) MIC full business case
completed: MIC design
development undertaken by
the end of March 2027. 
5. Undertake a feasibility study
into North Lorn Port.
1. Camas House
nearing completion
at the EMSP.
Awaiting CRP fund
decision on fitting
out of second
floor. 
2. MITC full business
being reappraised
with partners. 
UK and Scottish
Government
funding.
Council and HIE
staff resource. 
3. a) HIE GIA
(General
Investment
Accounts) with
external
funding sought
for fit-out.
b) HIE GIA and
council funded
Business
Gateway.
c) SAMS, RGD
and match
funding. 
4. a) UHI Argyll
and RGD.
b) University of
Stirling, RGD
and match
funding. 
Council or
future external
funding
opportunities. 
Delivery of
marine
economy
opportunities
across Argyll
and Bute.

Page 25

25 
Classification: OFFICIAL
Overarching Economic Key Outcomes for Argyll and Bute by the end of March 2028   
Data sources: Office for National Statistics, Scottish Annual Business Survey (data often reported two years in arrears) and Skills Development Scotland Regional Skills Assessments. 
These overarching economic outcomes can only be achieved through a strong focus on collaboration and a joined-up
approach, working closely with the Community Planning Partnership, complete with the revised Local Outcome
Improvement Plan (LOIP) and proposed future Community Wealth Building Action Plan (once CWB (Scotland) Bill
progresses through the Scottish Parliament during 2025 to become an Act), partner agencies and stakeholders across
Argyll and Bute and at both a regional and national level. 
1. Increase the rate of economic activity for the 16-64 cohort to 76% (i.e. an increase of 360 individuals).
2. Grow the Argyll and Bute workforce by 600 individuals.
3. Secure a 5% uplift in place-based investment.
4. Increase in turnover by 30% and increase in job creation by 26% for all supported businesses.
5. Deliver 20 key worker homes.
6. Retention of 60 FTEs and the creation of 30 FTEs.

Page 26

26 
Classification: OFFICIAL
GLOSSARY of ACRONYMS
COUNCIL DEPARTMENTS AND PARTNER ORGANISATION DEVELOPMENT PROJECTS / PROGRAMMES EXTERNAL FUNDS 
DEG: Development & Economic Growth, Argyll and Bute Council RGD: Rural Growth Deal UKSPF: UK Shared Prosperity Fund
DYW: Developing the Young Workforce, Argyll and Bute Council RSAP: Rural Skills Accelerator Programme NOLB: No One Left Behind
HR: Human Resources, Argyll and Bute Council STEM: Science, Technology, Engineering and Maths RCGF: Regeneration Capital Grant Fund
SG: Scottish Government CWB: Community Wealth Building  RTIF: Rural Tourism Infrastructure Fund
UKG: UK Government UAV: Unmanned aerial vehicle CLLD: Community Led Local Development Fund
HIREP: Highlands and Islands Regional Economic Partnership PCZ: Planning Control Zones LACER: Local Government COVID Economic Recovery
ABEP: Argyll and Bute Employability Partnership TDGC: Tobermory to Dalmally Growth Corridor HLF: Heritage Lottery Fund
OFGEM: Office of Gas and Electricity Markets HLGA: Helensburgh & Lomond Growth Area  HIE GIA: Highlands and Islands Enterprise General
Investment Accounts
HIE: Highlands and Islands Enterprise HEEPS: Home Energy Efficiency Programme for
Scotland 
SE: Scottish Enterprise CSSIDe: Centre for Seaweed & Shellfish Innovation &
Development (CSSIDe). 
SDS: Skills Development Scotland MAP: Marine Aquaculture Programme 
UHI:  University of the Highlands and Islands MITC: Marine Industry Training Centre 
UHI Argyll: University of the Highlands and Islands in Argyll MIC: Machrihanish Innovations Centre 
SAMS: Scottish Association for Marine Science EMSP: European Marine Science Park 
HITRANS: Highlands and Islands Transport Partnership  
SPT: Strathclyde Partnership for Transport  
BT: British Telecommunications  
ACT: Argyll and the Isles Coast and Countryside Trust  
ABRA: Argyll and Bute Renewables Alliance  
HES: Historic Environment Scotland  
BIDS: Business Improvement Districts  
CDTs: Community Development Trusts