Planning and Regulatory Services Committee 
Thursday, 13 June 2024 
NOTICE IS HEREBY GIVEN that a Special Meeting of the Planning and
Regulatory Services Committee is to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Thursday, 13 June 2024 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
Guidance Note 5 - 6
4 Planning Application 24/00532/APP
Report by Appointed Officer  
Installation and operation of 1x wind turbine (up to 200m to blade tip)
with associated infrastructure for a period of 35 years in association
with ref 23/01165/APP (PPA-300-2066) at Garbet Windfarm, Site
5.5km Southeast of Dufftown, Moray for Energiekontor  
7 - 26
5 Planning Application 2400770APP
Report by Appointed Officer  
Renovation and shopfit, install two heritage skylights in extension at
rear, replacement of single glazed shop front windows with double
glazed units and Install air conditioning unit at rear at 128 High Street,
Forres, Moray IV36 1NP for Mr Draeyk Van Der Horn  
27 - 40
6 Mosstodloch Masterplan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
41 -
138
Page 1

Page 2

Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Learning Estate Strategy -
Programme Delivery Update
Report by Depute Chief Executive (Economy, Environment and
Finance)  
139 -
166 
Information Report - Building Standards Futures Board
Update
Report by Depute Chief Executive (Economy, Environment and
Finance)  
167 -
174 
Summary of Planning and Regulatory Services
Committee functions:
Town and Country Planning; Building Standards; Environmental
Health; Trading Standards; Weights & Measures, Tree Preservation
Orders, and Contaminated Land issues.     
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
Page 3

Page 4

MORAY COUNCIL 
Planning and Regulatory Services Committee 
SEDERUNT 
Councillor David Gordon  (Chair)
Councillor Marc Macrae  (Depute Chair)  
Councillor Neil Cameron  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Donald Gatt  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Paul McBain  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

GUIDANCE NOTE PRODUCED FOR PLANNING AND REGULATORY SERVICES COMMITTEE
MEETING OF 13 JUNE 2024 
REPORT ON APPLICATION 
“Note for guidance of the Committee where the decision of the Planning and Regulatory Services Committee
is contrary to the recommendations of the Depute Chief Executive (Economy, Environment and Finance) in
respect to a Planning Application.” 
Any Councillor putting forward a motion to refuse an application, contrary to recommendation, shall clearly state the
reasons for refusal.  These reasons should be based on policies contained in the approved National Planning
Framework 4 (NPF4), Local Development Plan or some other material consideration.  Time should be allowed to
ensure that these reasons are carefully noted for minuting purposes. 
Where Councillors put forward a motion to approve an application, contrary to recommendation, an indication should
be given of any specific matters which should be subject of conditions along with reasons which should be based on
policies in the approved Local Development Plan or some other appropriate consideration. 
Note for guidance where the decision of the Planning and Regulatory Services Committee is to depart from
the Development Plan (NFP4 and or Local Development Plan) 
Where a Councillor is convinced that there is reason to depart from Development Plan policy; then the Councillor’s
reasons for making the motion should be clearly stated for minuting purposes.  Any matters which should be subject to
conditions drafted subsequently by the Depute Chief Executive (Economy, Environment and Finance) should be
indicated. If the Committee remains of a mind to approve such an application then the whole matter will be subject to
statutory procedures as apply. In such cases, Councillors should be aware that the application may require to be
advertised as a departure and any objections reported to the next available meeting of the Planning and Regulatory
Services Committee.  It also may be necessary to convene a hearing to consider the views of objectors. 
There are three potential consequences if Committee takes a decision where the proper procedures have not been
followed in whole or in part.  Firstly, the person aggrieved by a decision may apply to the Supreme Courts in Scotland
for an Order either compelling the Council to act according to law, quashing the decision altogether or declaring a
decision to be unlawful coupled with an order to prevent the decision being implemented.  A referral to the Supreme
Courts in these circumstances is known as applying for Judicial Review.   
Secondly, in addition to the application for Judicial Review when questions of alleged failure, negligence or
misconduct by individuals or local authorities in the management of public funds arise and are raised either by or with
the External Auditor of the Council and where an individual can be blamed the sanctions available are:- 
Censure of a Councillor or an Officer
Suspension of a Councillor for up to one year
Disqualification of a Councillor for up to five years 
In the case of the Council being to blame, recommendations may be made to the Scottish Ministers about rectification
of the authority’s accounts. Ministers can make an order giving effect to these recommendations. 
Thirdly, whilst the Ombudsman accepts that Planning authorities have the freedom to determine planning applications
as they wish procedural impropriety may be interpreted as maladministration.  This can also lead to recommendations
by the Ombudsman that compensation be paid. 
Consistent implementation of departure procedures maintains public confidence in the planning system and is
consistent with the time and effort invested in preparing the NPF4 and Local Development Plan. 
Page 5

Page 6

Page 6

Page 7

WARD 01_17 
24/00532/APP
10th April 2024
Installation and operation of 1x wind turbine (up to 200m
to blade tip) with associated infrastructure for a period of
35 years in association with ref 23/01165/APP (PPA-300-
2066) at Garbet Windfarm Site 5.5km Southeast Of
Dufftown Moray 
for Energiekontor 
Comments: 
• A Site visit has been carried out.
• The application was advertised for Neighbour Notification and under the
Environmental Impact Assessment Regulations.
• No representations have been received. 
Procedure: 
• None 
Recommendation 
Grant Planning Permission - Subject to the following: 
Conditions/Reasons 
Length of planning permission 
1. Unless otherwise agreed in writing with the planning authority, the permission
hereby granted shall endure for a period no longer than 35 years from the date of
final commissioning, after which the development shall cease to export electricity
to the national grid and shall be decommissioned in accordance with the details
otherwise approved elsewhere within this planning permission. The date of final
commissioning shall be as informed to the planning authority in writing or 18
months from the date of this planning permission, whichever is the sooner. The
date of final commissioning must coincide with the associated wind energy
development approved under planning reference 23/01165/APP on the 16
February 2024. Similarly, the date of decommissioning required under condition
27 of planning reference 23/01165/APP, must see the approved turbine comply
with the requirements of condition 27 also and cease to operate, be
decommissioned and site restored at the same time as the other 7 adjacent
turbines. 
Item 4
Page 7

Page 8

Reason: To avoid uncertainty and ensure that the permission is implemented
within a reasonable period, and to allow the planning authority to monitor
compliance with the other conditions imposed. The commissioning of the turbine
to concur with the associated development ensures consistent management and
decommissioning of the development alongside the consented scheme. 
2. The turbine selected must be of the same make, colour, rotor length and overall
height as the turbines utilised in the associated wind energy development
approved under condition 4 of planning reference 23/01165/APP on the 16
February 2024. 
Reason: In order to ensure that the turbine hereby approved matches visually
with the turbines approved under the associated mean wind farm consent. This
will ensure that there is visual consistency between the turbines erected avoiding
any unnecessary detrimental impact arising from the choice of turbine. 
Expiry of planning permission 
3. This planning permission will lapse on the expiration of a period of five years from
the date of this planning permission unless the development has been started
within that period. 
Reason: To apply a reasonable time limit for the implementation of the planning
permission. 
Micro-siting
4. The wind turbine, areas of hardstanding and track shall be constructed in the
locations shown in the approved Location Layout. The location of the wind turbine,
hardstanding and track may be varied (micro-sited) within the site subject to the
following, unless otherwise approved in advance in writing by the planning
authority:
a)  no wind turbine, track, hardstanding or other ancillary infrastructure shall be
moved more than 100 metres from the position shown within the Location
Layout. If any micro-siting is sought, it must first of all be approved in writing
by the planning authority (in consultation with the Ministry of Defence -
Safeguarding).
b)  all micro-siting permissible under this condition must be approved in advance
in writing by the ECoW appointed in accordance with condition 10 of
23/01165/APP granted consent by Moray council on the 16 February 2024.
c)  all micro-siting permissible under this condition must be approved in advance
in writing by the ECoW appointed in accordance with condition 10 of
planning permission 23/01165/APP approved on 16 February 2024.
d)  for any micro-siting of the turbine which results in an increase in altitude of
more than 5m from the approved position, a prior request for approval in
writing must be made to the planning authority (in consultation with the
Ministry of Defence, Safeguarding). Such a request must be accompanied by
an updated and comparative ZTV plan and wireline montages as required by
the planning authority. No such micro-siting can take place without the
written approval of the planning authority.
e)  no later than two months after the date of final commissioning, an updated
site plan shall be submitted to the planning authority showing the final
Page 8

Page 9

position of all wind turbines, anemometry masts, areas of hardstanding,
tracks and associated infrastructure forming part of the development. The
plan must also specify areas where micro-siting has taken place and, for
each instance, be accompanied by the ECoW or the planning authority's
written approval, as applicable. 
Reason: To ensure that micro-siting decisions take account of environmental
impacts and local ground conditions, including existing infrastructure. 
5. Unless otherwise agreed in writing with the Council as Planning Authority prior to
development commencing, the development must accord with conditions 3, 7-18,
21, 24, 28- 31 of planning approval 23/01165/APP granted consent by Moray
council on the 16 February 2024. Reference to the approved EIA Report within
these conditions however refers to submitted EIA Report where it differs from the
EIA Report approved under appeal decision PPA-300-2066. 
Reason: To ensure the turbine approved is installed, operated and managed in
line with the other surrounding turbines previously approved. 
Aviation Lighting
6. Prior to commencing construction of any wind turbine generators, or deploying
any construction equipment or temporal structure(s) 50 metres or more in height
(above ground level) the undertaker must submit an aviation lighting scheme for
the approval of the Moray Council in conjunction with the Ministry of Defence
defining how the development will be lit throughout its life to maintain civil and
military aviation safety requirements as determined necessary for aviation safety
by the Ministry of Defence. 
This should set out: 
a)  details of any construction equipment and temporal structures with a total
height of 50 metres or greater (above ground level) that will be deployed
during the construction of wind turbine generators and details of any aviation
warning lighting that they will be fitted with; and
b)  the locations and heights of all wind turbine generators and any anemometry
mast featured in the development identifying those that will be fitted with
aviation warning lighting identifying the position of the lights on the wind
turbine generators; the type(s) of lights that will be fitted and the performance
specification(s) of the lighting type(s) to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved
aviation lighting scheme. The lighting installed will remain operational for the
lifetime of the development. 
Reason: To maintain aviation safety. 
Page 9

Page 10

Aviation Charting and Safety Management 
7. The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information:
a)  the date of the commencement of the erection of wind turbine generator; 
b)  the maximum height of any construction equipment to be used in the
erection of the wind turbine; 
c)  the date the wind turbine generator is brought into use; 
d)  the latitude and longitude and maximum heights of the wind turbine
generator, and any anemometer mast(s). 
The Ministry of Defence must be notified of any changes to the information
supplied in accordance with these requirements and of the completion of the
construction of the development. 
Reason: To maintain aviation safety. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal accords with the relevant policies of the National Planning
Framework 4 and those of the Moray Local Development Plan 2020. The
proposed development will sit amongst and within the consented windfarm and is
acceptable and there are no material considerations that would indicate otherwise.   
List of Informatives: 
THE TRANSPORTATION MANAGER, DIRECT SERVICES has commented that:- 
Prior to the commencement of deliveries or any construction work, a Wear and
Tear agreement will be required to be approved between the developer and the
roads Authority. The scope of the Wear and Tear Agreement must be agreed with
the Roads Authority and must include a condition survey of the network
undertaken jointly by the developer and a representative from the Roads
Authority. The survey must include the full extent of the agreed construction traffic
route(s) (within Moray) between the site and the ‘A’ class road network. In
addition, the wear and tear agreement shall also include condition surveys of all
roads identified as ‘unsuitable’ which must be agreed with the Roads Authority. 
The Construction Traffic Management Plan must cover the duration of the
development, include methods of dealing with large and abnormal delivery
vehicles. The plan shall also include, the methods of marshalling and
manoeuvring at junctions on the public road network and any temporary traffic
waiting restriction requirements and all modifications to the road network and
traffic management arrangements. Routes for deliveries to and from the site and
routes which must not be used by development traffic (construction or staff) to
access the site. A programme of monitoring for all routes identified within the
CTMP during construction will be required. 
Page 10

Page 11

It is not acceptable to overrun central refuge/splitter islands, they are not
constructed to take vehicle loadings. Proposals submitted must show how this will
be managed during deliveries. It is also not appropriate to remove signing for the
duration of the abnormal loads therefore confirmation of how signs will be
managed during the delivery phase needs to be agreed. 
Some of the side tracks which join the public road may appear to be part of the
public road as they have a thin layer of tar on them. It is unlikely that there is
suitable road construction under any of them and where they are being utilised
each location should be assessed and reconstructed if necessary. 
Prior to completion of the development, all areas of temporary over-run must be
reinstated to an appropriate standard. Example 300mm thick dressed topsoil and
reseeded appropriate for the surroundings. 
Additional details for all areas of road widening and new passing places must also
include drainage details to accommodate the additional road surface area. 
Transport Scotland must be consulted with respect to all deliveries proposed via
the Trunk Road. 
The neighbouring Local Authorities, through which the delivery route may pass, 
Highland/Aberdeenshire/Aberdeen City, must be consulted as appropriate. 
Planning consent does not carry with it the right to construct a new road or any
part of a road. In accordance with Section 21 of the Roads (Scotland) Act 1984
Construction Consent for new roads (includes passing places, modified junctions
and footpaths) that will form part of the public road will be required. Advice on this
matter can be obtained by emailing transport.develop@moray.gov.uk and
reference to the following pages on the Council website. 
Checklist: http://www.moray.gov.uk/downloads/file68812.pdf 
RCC: http://www.moray.gov.uk/moray_standard/page_65638.html 
Specification http://www.moray.gov.uk/downloads/file68813.pdf 
The applicant is obliged to apply for a road opening permit in accordance with
Section 56 of the Roads (Scotland) Act 1984. Advice on this matter can be
obtained by emailing roads.permits@moray.gov.uk and reference to the following
page on the Council web site. 
Road Opening: http://www.moray.gov.uk/moray_standard/page_79860.html   
Public utility apparatus may be affected by this proposal. Contact the appropriate
utility service in respect of any necessary utility service alterations which have to
be carried out at the expense of the developer. 
No building materials/scaffolding/builder’s skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority.
Page 11

Page 12

If required, street furniture will need to be repositioned at the expense of the
developer. In addition, any existing roadside ditch may require a pipe or culvert.
Advice on these matters can be obtained by emailing road.maint@moray.gov.uk 
The applicants shall be responsible for any necessary diversion of any utilities or
drainage present at the locations where works are to be undertaken. 
The applicants shall meet all costs of improvements to the road infrastructure,
which are required as a result of the development. 
The applicants shall meet all costs of removal and re-erection of road signage,
which are required as a result of the delivery of the abnormal loads. 
The applicants shall meet all costs of diverting any footpath or cycleway during the
construction period, including signage. 
The applicants shall free and relieve the Roads Authority from any claims arising
out of his operations on the road or extension to the road. 
No retaining structures or embankments shall be constructed along the edge of
the road, whether retaining the public road or ground adjoining the public road
without prior consultation and agreement of the Roads Authority. 
Bridges and Structures - The developer must contact the Senior Engineer for
Bridges and Structures to discuss the proposals via structures@moray.gov.uk 
Traffic Management Plan - The developer must contact the Senior Engineer
Transportation discuss the proposals via transport.develop@moray.gov.uk 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description  
Location plan  
Elevation  
Turbine foundation  
Track cross section  
Crane hardstanding  
Cable trench design 
Page 12

Page 13

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance. PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Garbet Windfarm
Site 5.5km
Southeast Of Dufft
own
Planning Application Ref Number: 
24/00532/APP 
Location Plan
Applicant Name: 
Energiekontor
Page 13

Page 14

Site
Location
Page 14

Page 15

Site
plan
16/01664/APP
Page 15

Page 16

Turbine
elevation
16/01664/APP
Page 16

Page 17

PLANNING APPLICATION: 24/00532/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.   THE PROPOSAL 
•   Installation and operation of 1x wind turbine (up to 200m to blade tip) with
associated infrastructure for a period of 35 years in association with ref
23/01165/APP (previously approved under Directorate for Planning and
Environmental Appeals reference PPA-300-2066).
•   The turbine would sit amongst the already consented seven 200m high
wind turbines and be served by a spur off the approved track and connect
into the approved substation. The rotor diameter will be a maximum of
155m.
•   A further turbine foundation, track spur, crane pad and cable trench tying
into the approved track will be required. 
2.   THE SITE 
•   The site occupies an area of moorland and upland heathland, used for
grazing and is close to several derelict farms. 
•   The rural settlement of Haugh of Glass lies 4km to the east.
•   The Markie Water flows through the site in a north-easterly direction prior
to joining the River Deveron. There are a couple other minor
watercourses, tributaries of the Markie Water, which also flow through the
wider site of the wider windfarm, with the proposed turbines sitting with
this.
•   The site lies within an enclosed glen that opens up to the north-east. The
site lies within the Moray Landscape Sensitivity Study, Landscape
Character type14 ‘Open Uplands with Settled Glens’.
•   The windfarm site lies within the area designated where windfarm
extensions and repowering may be possible. The proposed turbine
location sits within this area with potential for extension and repowering.
•   A key scenic approach into Moray along the A920 (Huntly to Dufftown
Road) lies to the north-east of the windfarm development.
•   A few occupied dwellings lie approximately 3km to the north east of the
new turbine at Wester Braetown and Easter Braetown.
•   An archaeological site at Craig Dorney (hillfort site), immediately
southeast of the site, lies just outwith Moray and 2.5km from the proposed
turbine.
Page 17

Page 18

3.   HISTORY 
23/01165/APP – Section 42 to vary condition 3 and condition 20 of the original
planning consent ref 21/00020/EIA, which sought to vary the turbine models
and heights (now 200m) and micro-siting of the proposed windfarm. This was
approved by Members in February 2024. 
21/00020/EIA - Installation and operation of a windfarm comprising seven
turbines with a generating capacity of up to 46.2MW an electricity storage
facility with a maximum capacity of 3MW and associated infrastructure on land
5.5km south-west of Dufftown. This comprised of seven 190m high metre high
turbines and following a refusal by the Planning and Regulatory Services
Committee in November 2021. The development was subsequently approved
at appeal by the Scottish Government in September 2022. 
23/00144/APP - Upgrade works to the existing access track running south of
the A920 to Garbet windfarm, Site 5.5km Southeast of Dufftown, Moray. A
alteration to the approved access track to the site has recently been approved,
which would see the developers upgrade and use an existing hill track to the
site, accessed via the A920 to the north. This application was approved under
delegated power on 25.09.2023. 
Off site: 
22/00913/S36 – Proposed wind energy comprising of up to 11 wind turbines, up
200m high at Craig Watch immediately south of Garbet windfarm. This Section
36 application is still under consideration by the Energy Consents Unit and
Moray Council has yet to respond. Amendments have not yet been submitted,
but it is anticipated that changes to the proposal are forthcoming. 
23/00047/S36 – Construct, operate and decommission a wind farm with a
generating capacity in excess of 50MW consisting of up to 22 wind turbines
Approximately 3 km south of the site, a Section 36 application for an extension
to Clashindarroch windfarm has been submitted to the Energy Consents Unit.
Moray Council considered this application earlier in 2023 and did not about to
object subject to recommending conditions to the energy consents unit. 
Aberdeenshire Council, determined by Scottish Government (ECU Ref.
ECU00002002) Clashindarroch II windfarm proposes to develop fourteen
turbines, each with up to a 6MW capacity and with a tip height of 180m. The
proposal was consented after a Public Inquiry and lies within Aberdeenshire
adjacent to the existing Clashindarroch windfarm. 
Aberdeenshire Council application - APP/2009/1380 Clashindarroch Windfarm
– Eighteen turbines at 110m. The site is located immediately east of the
currently proposed windfarm site and has been in operation since 2015.
Page 18

Page 19

4.   POLICIES 
National Planning Framework 4
NPF3 - Biodiversity
NPF5 - Soils
NPF7 - Historic assets and places
NPF11 - Energy
NPF25 - Community wealth building
NPF1 - Tackling the Climate
NPF2 - Climate mitigation and adaptation 
Moray Local Development Plan 2020
PP2 Sustainable Economic Growth
PP3 Infrastructure and Services
DP1 Development Principles
DP9 Renewable Energy
EP2 Biodiversity
EP3 Special Landscape Areas
EP7 Forestry Woodland and Trees
EP10 Listed Buildings
EP12 Management and Enhancement Water
EP13 Foul Drainage
EP16 Geodiversity and Soil Resources 
5.   ADVERTISEMENTS 
5.1  The application was advertised as an EIA development and for neighbour
notification purposes. 
6.   CONSULTATIONS 
MOD Safeguarding – Wind - No objection subject to conditions. The turbine
would fall below and outwith the low-flying zone and would also be subject to
aviation mitigation by the previous approved scheme. 
Contaminated Land - No objection.   
Environmental Health Manager - Previous conditions regarding noise under
the consented windfarm to be attached.    
Private Water Supplies - No objection.  
Transportation Manager - No objection, subject to the relevant conditions of
Appeal Decision being re-iterated. Use of the alternative access onto the A920
to the north of the site approved under 23/00144/APP is also noted. Informative
advice to be attached also. 
Atkins Global - No objection.   
Page 19

Page 20

JRC - Windfarms - No objection. 
National Air Traffic Systems Limited - No objection.  
BAA Aerodrome Safeguarding - No objection.  
Aberdeenshire Council (North) - No objection.  
Scottish Environment Protection Agency - No objection and note the
proposed additional turbine should be subject of the same Peat Management
Plan. Suggested content of the PMP is passed to the applicant for their
information and the previously approved wind farm also contains a Peat
Management Plan. 
Aberdeenshire Council Archaeology Service - No objections. 
Strathbogie Community Council - No response received. 
7.   OBJECTIONS-REPRESENTATIONS 
None received. 
8.   OBSERVATIONS 
8.1  Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e., the adopted National Planning
Framework 4 (NPF4) and adopted Moral Local Development Plan 2020
(MLDP) unless material considerations indicate otherwise. 
8.2  Background
As the proposed turbine and consented windfarm are located immediately
adjacent to the local authority boundary with Aberdeenshire, consultation has
been undertaken with Aberdeenshire Council. Aberdeenshire Council
previously significant concerns about the windfarm under planning application
21/00020/EIA, but this did not formally object. These concerns alongside the
grounds for refusal by Moray Council were considered by the DPEA in arriving
at their decision to approve the planning application. Of note, nor did
Aberdeenshire Council object to the Section 42 variation and increase in
turbine height considered under 23/01165/APP last year. 
8.3 Of note, the approved windfarm was to take access primarily from road within
Aberdeenshire to the east of the approved site. However, due to difficulties, the
applicants subsequently applied for an alternative access route into the site
from the north via the A920 to the north (see planning history 23/00144/APP
above). This new access, which would serve as the delivery route for this
planning application leads to the A920 within Moray. 
8.4  Environmental Impact Assessment (EIA)
Proposals for more than two wind turbines are ‘schedule 2’ developments for
the purposes of the Town and Country Planning (Environmental Impact
Page 20

Page 21

Assessment) (Scotland) Regulations 2017. The original application
(21/00020/EIA) was an EIA application. The applicant has volunteered and
update the relevant sections of the EIA Report submitted with the original
windfarm and as updated by the subsequent Section 42 application
23/01165/APP (see history Section). 
8.5  The applicant has however provided an updated EIA Report in support of the
application which reviewed those matters affected by the revised tracks, turbine
positions and turbine heights. The EIA Report covers a range of issues related
to soils, peat, Groundwater Dependent Terrestrial Ecosystems, other habitat
and water environments such was water courses. 
8.6  Relationship of proposal to national renewable energy policy/guidance
National Planning Framework 4 (NPF4) which was adopted in 2023 nationally
effectively becomes the top tier development plan for use by all planning
authorities or bodies making planning related decisions. 
8.7  The Climate Change (Scotland) Act 2009 places a duty on public bodies to act
sustainability and meet emissions targets including a requirement to achieve at
least an 80% reduction in greenhouse gas emissions by 2050 (over 1990
levels). They are The Scottish Government’s Programme for Scotland 2020-21,
The Environment Strategy for Scotland, February 2020, Climate Change
(Emissions Reductions Targets) (Scotland) Act 2019, Scottish Government
Climate Change Plan (2018), Scottish Government Onshore Wind Policy
Statement 2017 and Scottish Energy Strategy (2017). These generally stress
the need to reduce carbon emissions (for which wind energy will clearly play a
part) but do qualify this with the need to protect landscapes, built and natural
heritage, residents and other interests. 
8.8  The applicant’s submissions regard national policy as being significant and
supportive of this proposal where this development, as a proven technology
providing a source of safe and locally produced renewable energy for many
years, will make a significant contribution towards renewable energy production
at the national and local level. Whilst it is noted that some targets have been
met for renewable energy production it is noted that the Scottish Governments
guidance in pursuit of renewables has not diminish support for renewable
energy proposals. 
8.9  The applicants have submitted a planning statement addressing NPF4 policy
11 Energy. It is clear that in tackling climate change a key aim of NPF4 is to
support renewable energy proposals that reduce greenhouse gas and reduce
carbon emissions. It therefore refers to policy 2 climate Change Mitigation and
Adaption that ‘significant weight’ will be given to tackling climate change, and
onshore wind is a part of that solution. 
8.10  National legislation is increasingly supportive of onshore wind development but
does within NPF4 policy 11 seek to state some caveats. Policy 11 energy lists
impacts which need to be addressed such as cumulative impacts, significant
landscape and visual impacts and impacts on historic environment to name
several of the thirteen impacts identified. These particular matters will be
addressed below.
Page 21

Page 22

8.11  Climate Change and Principle of Renewable Energy Proposal (NPF4
Policy 1, 2, 11 and DP9)
NPF4 Policy 1 ‘Tackling The Climate And Nature Crises’ states that significant
weight must be attached to the global climate and nature crisis. It aims seeks to
reduce emissions and supports development that addresses these goals.
Development of renewable energy is one such development and therefore
significant weight must be attached to its contribution toward emissions
reductions. Similarly, Policy 2 ‘Climate Change and adaptation’ seeks to
encourage, promote and facilitate development that minimises emissions and
adapts to the current and future impacts of climate change. This can directly be
linked to other wider objectives of NPF4 in creating sustainable places and the
production and transmission of clean energy is part of the spatial strategy or the
north of Scotland. 
8.12  Policy 11 ‘Energy’ states that project design and mitigation will demonstrate
how the various impacts are addressed and these are listed in section e) of the
policy. One within section e) being significant landscape and visual impacts,
recognising that such impacts are to be expected for some forms of renewable
energy. Where impacts are localised and/ or appropriate design mitigation has
been applied, they will generally be considered to be acceptable. This goes
beyond the comparable MLDP policy DP9 by implying that under certain
circumstances, even significant landscape impacts are to be accepted. Policy
11 Energy states that local landscape and visual impact are to be expected,
and this must therefore be born in mind for the A920 and Glen Markie area
north of the proposed and cumulatively with the rest of the consented windfarm. 
8.13  MLDP Policy DP9 Renewable Energy (informed by Moray Councils – Moray
Wind Energy Landscape Sensitivity Study 2023) states that all renewable
energy proposals will be considered favourably where they meet criteria
identified in policy. DP9a)i) where proposals should be compliant with policies
to safeguard and enhance the built and natural environment, while DP9a)iii)
gives a list of impacts that must be avoided to prevent an overall unacceptable
significant adverse impact occurring. The Moray Councils Wind Energy
Landscape Sensitivity Study states that this particular landscape (Open
Uplands with Settled Glens) would be highly sensitive to larger wind turbines of
as scale such as those now sought. Weight must however be attached to the
consented Garbet windfarm which would alter the sensitivity caused by this
further turbine. 
8.14  Impact of additional wind turbine (Policy 11 and DP9)
The proposed additional turbine would site within the consented grouping of
seven turbines and would sit slightly below the over altitude of several of the
adjoining turbines. Importantly it would not extend the width or vertical view of
the proposal. 
8.15  Within the supplementary Landscape and Visual Impact Assessment one of the
key viewpoints from which the turbine would be visible form the public road, is
Viewpoint 4 from the A920 looking south when travelling westbound. As you
leave Aberdeenshire and enter Moray, the current grouping of seven turbines,
would see an infill between of a gap between the two north-western most
turbines and the remainder of the group. Given the consented scheme as a
Page 22

Page 23

material consideration, the additional turbine would not detrimentally alter or
exacerbate the view from the A920. As with the original scheme, and the
conclusions of the Scottish Government Reporter who consented the wider
windfarm in 2022, the other views of the proposed additional turbine will be
visually contained by immediate hills to the north, west and south. Other than
walkers on the nearby or other local summits who may note the additional
turbine, the proposed addition would not depart from Policy 11, where its visual
impact would be confined to views in the locality of Glenmarkie and short
section of the A920. 
8.16  This additional turbine would need to be lit, resulting in a further aviation light in
the otherwise dark skyline, but would still amongst the other lit turbines already
consented, so this additional turbine would not overly change to night sky when
taking into consideration the consented scheme. Of note the previous condition
attached to 23/01165/APP pursing a reduced lighting scheme (in consultation
with the Ministry of Defence Windfarm Safeguarding and the Civil Aviation
Authority) for the additional turbine will be re-iterated. 
8.17  Impact on natural environment (EP1, EP2 and EP12)
In EP1 Natural Heritage Designations there are no international, national or
local environmental designations present. A number of Groundwater
Dependent Terrestrial Ecosystems (GWDTE’s) were noted in the wider area,
areas of bog as well as other habitats such as riparian woodland along the
small water courses running through the site. Policy EP12 Management and
Enhancement of the Water Environment, and EP2 Biodiversity seeks to ensure
proposals do not have an adverse effect on protected species. The proposed
turbine, its track and other infrastructure have sought to avoid deep peat, and
land subject to any other environmental designations and is an acceptable
distance from water courses. 
8.18  The submitted EIA report, which supplements the previously approved
supporting EIA Report for 21/00020/EIA) and as update 23/01165/APP is
designed to tie the development into much of the mitigation proposed for the
wider development. Conditions covering the necessary mitigation and good
practice will be attached or repeated from the overall windfarm consent. 
8.19  Impact on soil resources/minerals (NPF4 Policy 5 and EP16)
Policy 5 does state that while generally carbon rich soils should be avoided by
development, c) ii. within the policy states generation of energy from renewable
sources that optimises the contribution of the area to greenhouse gas
emissions reductions targets may be accepted in peatland. 
8.20  Policy EP16 Geodiversity and Soil Resources states that for large scale (over
20MW) renewable energy proposals, development will only be permitted where
it has been demonstrated that unnecessary disturbance of soils, geological
interests, peat and any associated vegetation is avoided. 
8.21  Revised ground assessments have been undertaken for the position of the
proposed crane pad, track extension, turbine base and cable trench. The
additional turbine will not be located in a position of deep peat or peat liable to
slippage. It is noted that conditions are carried forward from the main consent
that require a finalised Habitat Management Plan, and Peat Management
Page 23

Page 24

Plans, inclusive of the Peat slide risk assessment. It is recommended that this
turbine comply with the relevant conditions of the adjoining windfarm to achieve
a coherent approach. 
8.22  Impact on cultural heritage (NPF4 policy7 and EP8 and EP10) 
NPF4 Policy 7 Historic assets and places and MLDP EP8 Historic Environment
seeks to protect historic and archaeological assets. Policy EP8 Historic
Environment seeks to protect historic and archaeological assets. EP10 Listed
Buildings states that development proposals will be refused where they would
have a detrimental effect on the character, integrity or setting of a listed
building. Structures such as windfarms have the potential to affect the setting of
listed buildings and other cultural heritage assets some distance away. 
8.23  The submitted Zone of Theoretical Visibility for heritage assets shows that the
proposed turbine would have minimal impact upon the setting of heritage
assets and would not be visible form assets such as Auchindoun Castle due to
intervening landscape. As such there is no conflict with heritage interests or
above policies. 
8.24  Access and traffic impacts (NPF4 policy 13 and DP1)
NPF4 policy 13 Policy Sustainable transport and Policy DP1 Development
Principles (ii) and its associated appendix in the MLDP 2020 identifies the
transportation requirement for development in Moray and seek to ensure that a
safe and appropriate access is provided to new developments. 
8.25  Further to the approval of an access to the windfarm via the minor public road
to the east of Glenmarkie, leading to the Haugh of Glass U146H and C8H, the
applicants subsequently obtained consent under planning application reference
23/00144/APP taking access onto the A920 to the north, via an upgraded hill
track. This approval in addition to repeating the relevant conditions of the
overall windfarm development (as requested by the Transportation Manager)
would ensure compliance with the above policies. This revised access sees the
proposed delivery of the currently sought and consented turbines avoiding
several road side residences to the north within Glenmarkie. 
8.26  Aviation Issues (NPF4 Policy 11, DP9 and EP15)
NPF4 policy 11 Energy e) iv. requires wind energy proposals to mitigate
impacts aviation and defence interests. 
8.27  Policy DP9 seeks to ensure that renewable energy proposals avoid any
impacts resulting from aviation and defence constraints including flight paths
and aircraft radar. As the originally approved windfarm was subsequently
amended with the turbines heights increased by 10m and some of the turbines
repositioned, the planning consent under Section 42 of the Act 23/01165/APP
came into conflict with the RAF radar system. 
8.28  The applicant then, working with the Ministry of Defence – Safeguarding (MoD)
team agreed the installation of a proven radar mitigation scheme, which ensure
the windfarm would not be compromised by the development. Consultation with
the MoD for the proposed additional turbine confirmed that the approved radar
mitigation scheme could be installed to cover this turbine also. Conditions from
the MoD are attached to the recommendation.
Page 24

Page 25

8.29  Planning Obligations and community investment opportunities (NPF4
Policy 11, 25 and IMP3)
NPF4 Policy 11 states that proposals will only be supported where they
maximise net economic impact, including local and community socio economic
benefits. Policy 25 states developments that contribute towards local/regional
community wealth building strategies and are consistent with local economic
priorities will be supported. While for new wind energy projects consideration is
being given as to how net economic benefits might be realised. 
8.30  No planning obligations contributions are due as such development would not
have any impact on community facilities, schools etc. It has been deemed
previously in the Scottish Planning System "Community Benefit Funds" from
the development management system. The setting up of a Community Benefit
Fund should not be a matter that influences the planning decision and would be
arranged separate to the planning process in the event that permission is
granted. This approach is highlighted in Annex A ‘Defining a Material
Consideration’ of the Circular 3/2013: Development Management Procedures.
The applicants have referred to contributing to a Community Benefit Fund in
submissions, and it is noted that the seven turbines of Garbet windfarm were
consented in 2022, prior to adoption of NPF4. This therefore predates the
requirement NPF4 for community wealth building and maximise net economic
impact, including local and community socio-economic benefits. For a single
turbine, utilising already consented tracks, substations and infrastructure there
is limited scope to purse community benefit or other economic benefits in
isolation form the rest of the development. In this instance, no additional action
is being sought under these policies, and the turbine will be managed and
operated in line with the rest of the previously wind energy development. 
Conclusions
Various conditions of the consented windfarm such as decommissioning,
environmental mitigation and operational matters including noise are addressed
in the conditions repeated and bound to planning permission 23/01165/APP.
The turbine will read as part of the already consented Garbet windfarm and will
site wholly within the grouping of turbines if developed. This significant weight
to be attached to supporting renewable energy development such as this under
NPF4 justifies it approval. 
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal accords with the relevant policies of the National Planning
Framework 4 and those of the Moray Local Development Plan 2020. The
proposed development will sit amongst and within the consented windfarm and
is acceptable and there are no material considerations that would indicate
otherwise. 
Page 25

Page 26

EIA Reasoning for decision
Moray Council's assessment of the information presented within the EIA Report
and other environmental information in relation to this development is contained
within the Report of Handling. It is considered that the development will not
have any significant impacts on the environment. The various mitigation
measures remain in place under the Scottish Government appeal decision in
September 2022, with all conditions relating to mitigation repeated within this
consent. 
Moray Council is satisfied that other effects/issues can be addressed by way of
mitigation. 
A detailed description of the proposed mitigation is contained within the EIA
Report and this Report of Handling. 
Author/Contact
Officer:
Neal MacPherson          
Acting Development Management
and Building Standards Manager
Ext: 01343 563266 
Neal MacPherson
Acting Development Management & Building Standards Manager
Page 26

Page 27

WARD 08_17 
24/00770/APP
14th May 2024
Renovation and shopfit install two heritage skylights in
extension at rear replacement of single glazed shop front
windows with double glazed units and Install air
conditioning unit at rear at 128 High Street Forres Moray
IV36 1NP
for Mr Draeyk Van Der Horn 
Comments: 
• Application is being reported to the committee as it is submitted by a Councillor     
that is involved in the statutory planning process.
• No representations have received to date.   
Procedure: 
• Delegated authority to Head of Economic Growth and Development to issue
decision subject to no further substantive representations being received following
expiry of neighbour notification period. 
Recommendation 
Grant planning permission subject to the following conditions: 
Conditions/Reasons 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act 1997
as amended. 
2. Noise emissions arising from the new air conditioning unit shall not exceed Noise
Rating Curve (NR) 25, as determined within a living apartment of the nearest
noise sensitive dwelling with the window moderately open. This limit would apply
and be determined over a minimum of 5 minutes duration between the hours of
0700 to 2300 hours. 
Reason: To protect local residents from noise nuisance from the development. 
Item 5
Page 27

Page 28

3. Noise emissions arising from the new air conditioning unit shall not exceed Noise
Rating Curve (NR) 20, as determined within a bedroom of the nearest noise
sensitive dwelling with the window moderately open. This limit would apply and be
determined over a minimum of 5 minutes duration between the hours of 2300 to
0700 hours. 
Reason: To protect local residents from noise nuisance from the development. 
4. The rating level of noise associated with the new air conditioning unit shall not
exceed the background sound level by more than 5 dB(A) at the nearest noise
sensitive dwelling(s).  For the avoidance of doubt, the rating level and background
sound level associated with this condition is defined within BS 4142:
2014+A1:2019 Methods for rating and assessing industrial and commercial
sound. Measurement and assessment to demonstrate compliance with the rating
level shall be undertaken in accordance with BS 4142: 2014 Methods for rating
and assessing industrial and commercial sound. 
Reason: To protect local residents from noise nuisance from the development. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal accords with the relevant provisions of the National Planning
Framework 4 and Moray Local Development Plan 2020 and there are no material
considerations that indicate otherwise.   
List of Informatives: 
THE ENVIRONMENTAL HEALTH MANAGER, has commented that:- 
Operation of the premises shall not give rise to a Statutory Nuisance in terms of
the Environmental Protection Act 1990. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
128.13 Front window details
128.08 A Rear elevation
128.09 A Roof plan
128.11  Proposed floor plan
128.01  Location plan
128.12  Front elevation 
Page 28

Page 29

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance. PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
128 High Street
Forres
Planning Application Ref Number: 
24/00770/APP
Location Plan
Applicant Name: 
Mr Draeyk Van Der Horn
Page 29

Page 30

Site
Location
Page 30

Page 31

16/01664/APP
Page 31

Page 32

Photo
1—
Front elevation
16/
Page 32

Page 33

Photo
2—
Rear elevation
16/
Page 33

Page 34

Photo
3—
Rear elevation
16/
Page 34

Page 35

PLANNING APPLICATION: 24/00770/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.   THE PROPOSAL 
•  Planning permission is sought in this case for the renovation of 128 High
Street, Forres.  
•  The renovation works comprise:-
•  The replacement of single glazed front shop windows with timber
double glazed windows (same design), painted to match existing.
•  The installation of two heritage skylights in the rear extension. 
•  The installation of an air conditioning unit on the rear elevation. 
•  The existing storm door is to be refurbished. 
•  The front elevation is to be repainted in a colour similar to the
existing. 
•  Internally the existing shop fitting removed, and a new store area is
to be created. 
•  Two windows on the rear of the building are to be refurbished. 
•  Removal of a hanging sign and bracket and the removal of a wall
mounted sign. 
2.   THE SITE 
•  128 High Street, Forres is located at the west end of Forres Town Centre,
in the Forres Conservation Area. 
•  128 High Street is part of a larger building (130, 132 and 132A High
Street) which is Grade B Listed. 
•  128 High Street is currently vacant, and its most recent use was a
Newsagent. 
•  This part of the High Street comprises a variety of uses with mainly retail
on the ground floor and residential properties above. 128 High Street has
a flat above it and dwellinghouses to the rear, with shops either side on
the ground floor. 
3.  HISTORY 
24/00672/LBC – Application for listed building consent for renovation and shop-
fit works, install two heritage skylights in extension at rear, replacement of
single glazed shop front windows with double glazed units and Install air
conditioning unit at rear at 128 High Street, submitted 16 May 2024 and
currently under consideration. This is the associated listed building application
for these proposals and shall be determined under delegated powers (in line
Page 35

Page 36

with the delegation scheme) once the application which is the subject of this
report is determined. 
4.  POLICIES 
National Planning Framework 4 (NPF)
Policy 1 - Tackling the Climate and Nature Crises 
Policy 2 - Climate mitigation and adaptation 
Policy 3 – Biodiversity
Policy 7 – Historic Assets
Policy 14 – Design, Quality and Place 
Policy 23 – Health and Safety 
Policy 27 – City, Town, Local and Commercial Centres 
Moray Local Development Plan 2020 (MLDP)
PP1 – Placemaking 
DP1 Development Principles
DP7 – Retail / Town Centres
EP9 – Conservation Areas
EP10 – Listed Buildings
EP14 – Pollution, Contamination and Hazards 
5.   ADVERTISEMENTS 
5.1 Forres Gazette – Planning application affecting Listed Building/Conservation       
Area. 
6.   CONSULTATIONS 
Environmental Health - No objection, subject to conditions being attached to
the consent relating to acceptable noise levels from the proposed air
conditioning unit. 
7.   OBJECTIONS-REPRESENTATIONS 
NOTE: Following the determination of this application, name and address
details will be/have been removed (i.e. redacted) in accordance with the
General Data Protection Regulations (paragraph 3 of Minute, Planning &
Regulatory Services Committee 16 September 2014). 
The neighbour notification expiry date for this application is 18.06.2024. 
No letters of representation had been received at the time of writing this report. 
Page 36

Page 37

8.   OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e., the adopted National Planning
Framework 4 (NPF4) and adopted Moral Local Development Plan 2020
(MLDP) unless material considerations indicate otherwise. The main issues
are: 
8.2 Impact of proposal on Listed Building and Conservation Area (NPF 7 /
MLDP EP9 and EP10)
Policy 7 together with policy EP9 Conservation Areas seek to ensure that new
development preserves and enhances the established traditional character or
appearance of the area, highlighting that this will typically require the use of
traditional materials and style. Policy EP9 states that contemporary designs
and materials may be acceptable as long as they respect the architectural
authenticity of the building and the character of the conservation area. Policy 7
and Policy EP10 Listed Buildings require that development proposals which
would have a detrimental effect on the character, integrity, or setting of a listed
building be refused. 
8.3 The Grade B Listed Building was built circa 1820. It is 2 storeys with 4 bays to
the High Street, it has a slightly recessed bowed corner, 4 bays to a court, all
ashlar fronted. Number 128 and 132 are late 19th century shopfronts. 
8.4 128 High Street operated previously as a newsagent and is currently vacant.
The renovations are required as part of proposals to operate an Art Gallery
from the premises. 
8.5 The proposals represent an appropriate set of renovation works that would
respect the architectural integrity of the building and its setting. The new double
glazed timber windows (to match existing), refurbished storm doors and other
works will enhance the front elevation of the building and preserve and
enhance the character and appearance of the conservation area.   
8.6 A windows schedule (including photographs) has been submitted with the
proposal. This details the existing condition of the windows and doors and what
works are to be carried out on each. The schedule states the existing front
windows (which are to be replaced with double glazed timber windows) are in a
poor condition, they have been subject to water ingress, condensation and pest
damage and have deteriorated beyond repair. Visually the new windows will
have the same appearance as the existing. On the basis of this information the
replacement of the front windows is considered acceptable.   
8.7 As noted from the history section above, a separate Listed Building Consent
(24/00672/LBC) for the works has been submitted is currently under consideration.
Historic Environment Scotland were consulted and have confirmed that it has no
comments to make on the proposal (their response is under 24/00672/LBC). 
8.8 The proposed works are in accordance with relevant planning policy and
guidance and will not have a detrimental impact on the character or
architectural interest of the Listed Building or Conservation Area. The proposed
alterations will ensure the continued beneficial use of the building. 
Page 37

Page 38

8.9 Design and Impact on Town Centre (NPF 14 and 27 / MLDP DP1 and DP7)
Policy 14 and DP1 together set out the need for the scale, density, and
character of development to be appropriate to the surrounding area and to
create a sense of place, and to not adversely impact neighbouring properties in
terms of privacy, daylighting, or overbearing loss of amenity. 
8.10 Policies 27 and DP7 aims are to encourage, promote and facilitate
development in town centres. Policy DP7 states Town Centres are at the heart
of communities and can be hubs for a range of activities. The policy intends to
promote the continued use of town centres for a diverse mix of uses including
retail, commercial and leisure uses and as centres for social, community and
tourism activity. 
8.11 The renovation of this property on the High Street of Forres is welcomed, and
the premises being brought back into use will increase footfall to the town
centre which is of benefit to the area. 
8.12 The works are in scale and keeping with surrounding area and there are no
issues in terms of loss of amenity. The criteria in these policies have been met. 
8.13 Pollution (NPF 23 / MLDP 14)
Policies 23 and 14 together seek to ensure that new developments do not
create pollution which could adversely affect the environment or local amenity.
Pollution can take various forms including run off into watercourses, noise
pollution, air pollution and light pollution. 
8.14 The proposal includes the installation of an air conditioning unit on the rear
elevation of the building. Environmental Health were consulted on the proposal
and following review of the noise data for the air conditioning unit have raised
no objection subject to conditions being attached to the consent relating to
acceptable noise levels being adhered with.    
8.15 Climate Change and Biodiversity (NPF4 Policies 1, 2 & 3) 
The proposal is of very small nature that will result in minimal impact in terms of
climate change. It is not necessary to seek formal biodiversity enhancement on
a minor proposal of this nature. The proposal therefore is deemed to comply
with NPF policies 1, 2 and 3. 
Conclusion and Recommendation
The proposal represents an acceptable renovation of a vacant historic property
in the Forres Town Centre and by bringing it back into use would contribute to
the vitality of the centre. The proposal complies with relevant Development Plan
policies and is recommended for approval, subject to conditions. 
Page 38

Page 39

REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal accords with the relevant provisions of the National Planning
Framework 4 and Moray Local Development Plan 2020 and there are no
material considerations that indicate otherwise. 
Author/Contact
Officer:
Emma Mitchell            
Planning Officer
Ext: 01343 563249 
Neal Macpherson 
Acting Development Management & Building Standards Manager 
Page 39

Page 40

Page 40

Page 41

REPORT TO: SPECIAL PLANNING AND REGULATORY SERVICES
COMMITTEE ON 13 JUNE 2024 
SUBJECT: MOSSTODLOCH MASTERPLAN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report asks the Committee to agree the Mosstodloch Masterplan. 
1.2 This report is submitted to Committee in terms of Section III (E) (2) of the
Council's Scheme of Administration relating to the review and preparation of
Local Development Plans. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee; 
(i) notes the representations received to the public consultation on
the draft Mosstodloch masterplan and agrees the Council’s
response to these as set out in Appendix 1; 
(ii) agree that the masterplan at Appendix 2 will be treated as a
material consideration in the determination of planning
applications with significant weight given to sites designated
within the adopted Local Development Plan (LDP) and that sites
not currently within the adopted LDP (namely sites E3, E4, ENG1,
ENG2 and the proposed leisure/tourism use adjacent to site O1)
will have limited weight; and 
(iii) Delegate authority to the Head of Economic Growth and
Development to work with Crown Estate Scotland to make
additional technical changes required in respect of active travel,
public transport and the A96 and to adopt the masterplan as non-
statutory supplementary guidance. 
Item 6
Page 41

Page 42

3. BACKGROUND 
3.1 In Mosstodloch the Moray Local Development Plan 2020 (MLDP2020)
designates land for significant strategic long-term growth.  This includes a
mixed-use LONG site (MU LONG1) to the south of the A96 for residential and
business use.  Large areas of employment land are designated to the west of
Mosstodloch including I3 and LONG2.  These designations have requirements
for a masterplan and development framework respectively. 
3.2 Crown Estate Scotland (CES) control large areas of land around Mosstodloch
including designated sites.  Given their wider land ownership CES wanted to
prepare a masterplan that considered the whole village and not just individual
development sites.  As set out in the report to a meeting of this Committee on
30 May 2023 CES’s design team engaged with the community and
stakeholders in developing proposals for the masterplan.  At the meeting it
was agreed that the draft Mosstodloch masterplan would be consulted on for
a 12-week period with the comments received and final masterplan to be
reported back to this Committee for approval (para 11 of the minute refers).
Given the previous engagement by the CES design team the consultation on
the draft masterplan was held virtually online. 
3.3 The draft masterplan was available for comments from 5 June to the 28
August 2023 with the consultation advertised via social media, press release
and emails to interest groups.  Bookable 1-2-1 sessions were offered but none
were booked.  A total of 20 representations were received from the public.
The representations raised a number of issues including the impact on local
services and infrastructure including health, education, shops and roads;
concerns about the scale of development proposed; impact on woodlands;
noise impacts; delivery of the proposed spine road; delivery of landscaping;
and cumulative impacts of surface and waste water.  A summary of the
representations and the Council’s response to these is provided in Appendix
1.  Comments were also received from Scottish Environment Protection
Agency, NHS Grampian, Aberdeenshire Archaeology, Transport Scotland,
Historic Environment Scotland, and internal consultees. 
3.4 The draft masterplan was given no status at the point of approving it for public
consultation as a number of key issues needed to be addressed through the
consultation process.  These have now been addressed and with the changes
resulting from the consultation process, officers recommend that the
masterplan (Appendix 2) be considered as material consideration to be given
weight in the development management process.  Officers are consulting
internally for any additional technical changes required to the masterplan
before it is considered for adoption with some outstanding issues including
requirements for active travel, amendments to text related to public transport
and text changes related to the A96.  Delegated authority is requested for
officers to make any resultant text and technical changes and move to adopt
the masterplan as non-statutory supplementary guidance. 
Page 42

Page 43

4. MOSSTODLOCH MASTERPLAN 
4.1  The masterplan (Appendix 2) is framed around considering what
Mosstodloch could be in 2040 and beyond.  Taking this village wide longer-
term approach has included review of existing designations and the suitability
of these to support a longer-term vision for Mosstodloch.  As a result the
masterplan proposes changes to existing designations and introduction of
new sites in order to support the long term vision for Mosstodloch. 
4.2 New sites proposed in the masterplan are not part of the adopted Local
Development Plan and therefore have not been through the same
examination process as existing sites.  Therefore, only limited weight can be
given to the masterplan in respect of these proposals in planning decisions.
This affects sites E3, E4, ENG1, ENG2 and the tourism/leisure opportunity
adjacent to O1 (page 55 of Appendix 2). These sites will be considered
through the review of the LDP and if taken forward in the new LDP
(programmed to be adopted in 2027) could be given more weight at this point. 
4.3   The vision in the masterplan is for Mosstodloch to be:
• A place with a choice of good homes for all sections of the community
• A place with a heart where a growing community can come together
and interact
• A place that is designed for people movement
• A place that provides the opportunity to work locally 
• A place that is well connected with its environment 
• A zero carbon place 
4.4   To achieve this, the Masterplan proposes the following elements:
• A western spine road from the Cowfords roundabout that connects into
the Garmouth Road.  A mix of employment uses would be accessible
from this spine road.  The spine road would offer an alternative route to
access Garmouth Road that would avoid going through the village
centre, particularly for HGV’s.  The spine road would access land
currently designated for industrial but also proposed new designations
to the north of Mosstodloch for employment and renewable energy
proposals (E3, E4, ENG1 and ENG2).  The new employment site
would incorporate and replace the R1 site in MLDP2020 which has
remained undeveloped since the 2015 Local Development Plan and is
understood from informal discussions with house builders to be
unattractive. 
• A new residential housing site is proposed for 120-150 houses to the
west of Mosstodloch on land currently designated for industrial use.
This site would create an attractive new edge and gateway to the
settlement and could be accessed off the proposed spine road.
• The site to the south of the A96 currently designated for a mix of
residential and business uses is now proposed to be largely residential.
Development of a masterplan will still be required that sets out the
placemaking principles for this site in more detail. 
• The opportunity site at Balnacoul (OPP1) is carried over for
development as proposed within the Local Development Plan. 
Page 43

Page 44

• A key concept of the masterplan is strengthening the village centre and
creating a village spine that connects from the existing industrial estate
in the north through the village centre to the mixed-use LONG site to
the south of the A96.  Enhancement of the village centre could range
from environmental enhancements to more significant redevelopment
to help support the concept of local living.  A site to the east of the Ian
Baxter Picnic Area is identified as a mixed-use site that would have the
potential to accommodate an expanded village centre with a mixture of
community or village uses.  This would strengthen the north south
spine and provide space to accommodate services to support the
expanding village.   
• The masterplan promotes a range of net zero objectives and identifies
potential sites for solar, combined heat and power (CHP) and a
hydrogen hub.  It is proposed these are accommodated to the north of
the proposed new employment designation north of Mosstodloch. 
• Two versions of the land use masterplan are shown one without the
A96 dualling and one with.  The main difference between these is that
the proposed junction location for the dualling gives the opportunity for
a tourism/leisure use close to this which could also serve a function for
vehicle fuelling (EV and potentially hydrogen). 
• The masterplan sets out proposals for a green network including
extension and enhancement of the path network to create green loops
around the village, improving the function of the small green space to
the east of Mosstodloch Services so this provides an active function
that compliments the village centre, expanding the green space to the
north of Pinewood Road to provide a community growing space and a
buffer to proposed employment use while continuing to accommodate
the core path, a new landscaped gateway to the west of Mosstodloch,
a new area of parkland along the Black Burn that will positively manage
SUDS within the employment sites, improvements to the existing
Speymouth Park and maximising safe active travel routes in new
development.
• The land to the north of the existing sawmill is shown within the
masterplan reflecting consented proposals to expand James Jones
sawmill. 
4.5 A village wide approach has been taken to the masterplan and not all the
proposals are on land within Crown Estate Scotland’s control.  A partnership
approach to delivery with key stakeholders and landowners will be required. 
4.6 Crown Estate Scotland have offered to provide consultant support to the
community to develop a Local Place Plan if this is something the community
wishes to pursue. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Mosstodloch masterplan provides a long-term vision for the growth
of Mosstodloch including infrastructure, employment and affordable
housing which are priorities for the Council. 
Page 44

Page 45

(b) Policy and Legal
Once approved the masterplan will become non-statutory
Supplementary Guidance which planning applications will be determined
against. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
Work on the Mosstodloch masterplan has been carried out within
existing staff workloads of the Strategic Planning and Development
section with input and review of documents by Transportation, Education
Resources and Communities, Strategic Planning and Development,
Consultancy (Flooding) and Environmental Health. 
(f) Property
As the masterplan covers the whole of Mosstodloch this includes
property owned by the Council including Mosstodloch Primary School
and Mosstodloch Industrial Estate. 
(g) Equalities/Socio Economic Impact
None at this stage. 
(h) Climate Change and Biodiversity Impacts
The NPF4, specifically policy 1 (Tackling the climate and nature crises)
gives significant weight to the global climate and nature crises in the
determination of planning applications.  NPF4 Policy 2 (Climate
mitigation and adaption) states that all proposals should be designed to
minimise emissions over their lifecycle and development is to be sited
and designed to adapt to current and future risk from climate change.
Similarly, policy 3 (Biodiversity) requires development to contribute to the
enhancement of biodiversity.  Whilst policy 15 (Local Living and 20-
minute neighbourhoods) supports the principle of Local Living.   
By taking a whole village approach the Mosstodloch masterplan seeks to
achieve some of the aspirations of NPF4 in terms of providing
opportunities for local services and active travel connections to support
Local Living.  The masterplan also identifies opportunities for renewable
energy.  Future applications will be assessed against NPF4 policies. 
(i) Consultations
Consultation has taken place with the Depute Chief Executive Economy,
Environment and Finance, the Head of Economic Growth and
Development, the Head of Education Resources and Communities, the
Head of Housing and Property, the Legal Services Manager, the Senior
Engineer Transportation, the Principal Climate Change Officer, the Equal
Page 45

Page 46

Opportunities Officer, the Democratic Services Manager, and Chief
Financial Officer and their comments incorporated into the report. 
6. CONCLUSION 
6.1 The draft masterplan was made available for consultation and 
responses have resulted in a number of amendments to the masterplan. 
6.2 The Mosstodloch masterplan provides a vision and strategic framework
for the long-term development of Mosstodloch.  The masterplan aspires
to provide a choice of good homes, opportunities to work locally, an
enhanced village centre, connections to the environment and a zero
carbon place. 
Author of Report: Rowena MacDougall, Senior Planning Officer 
Background Papers: 
Ref: 
Page 46

Page 47

Response
Reference 
Name Comments Moray Council Response Proposed Change
to Masterplan
Support for Masterplan 
MSMP001 Tom
Andryszewski
Welcome the masterplan. The plan should
include more places to work including more
retail around the “strengthened” village centre
and expansion of the industrial to the north of
the village. This will help reduce the need to
commute. 
Important that development provides a sense
of place around a central meeting point.
Important that the new housing to the south of
the bypass are not disconnected from the rest
of the village and pedestrian access to the
school and shops will be paramount. 
Support for the masterplan including the key
elements of strengthening the village centre and
expansion of employment land are noted. 
Policies within NPF4 and Moray Local
Development Plan 2020 require development to
contribute to creating a sense of place. However,
this could be further acknowledged on page 51
under the heading of “Village Centre” by stating
that opportunities must be designed to help to
create a strong sense of place and identity. 
The designation of the MU LONG 1 (to the south
of the A96) site in MLDP2020 has requirements
for cycle paths and improvement to provide safe
routes to the school and local shops. The
connection to/from the housing to the south of
the A96 to the rest of the village will be a key
consideration for the masterplan that requires to
be developed for that site.
Text added to
page 51 regarding
creating a sense
of place.
MSMP011 Angela
Costello 
Supports proposals. Mosstodloch is a friendly
community to grow up in and the plan is great
idea for the future. On waiting list for a
property. 
Support noted.  
Impacts on Infrastructure and services 
MSMP002 Emma Craig  Will put bigger strain on the hospital in Elgin
which is already terrible. 
The masterplan includes proposals to strengthen
the village centre this includes potential for
enhanced retail provision to support new homes
and support local living.    MSMP003 Michelle
Graham
Any expansion proposals must include building
of a new school. The existing school is not fit for
Item 6
Page 47

Page 48

purpose and could not support an influx of
families from 500 new houses. 
A masterplan led approach ensures that all
necessary long term infrastructure and
transportation requirements are identified from
the outset.  The MLDP takes an infrastructure first
approach to ensure that any adverse impact upon
existing infrastructure is mitigated. The Council
seeks developer obligations, which are financial
contributions, from developers towards
infrastructure items to mitigate the impact of
developments. In this case, to satisfy policy PP3
Infrastructure and Services of the MLDP 2020 and
NPF4 Policy 18 Infrastructure First, any future
proposal will have to proportionately contribute
towards increasing capacity at Fochabers Medical
Practice.  This requirement is set out within the
LDP2020 Developer Obligations Supplementary
Guidance 
NHS Grampian have been consulted on the
masterplan and the impacts on the GP practice
are acknowledged. To address the impact on
existing healthcare infrastructure contributions
would be required to increase capacity. This
requirement is set out within the LDP2020
Developer Obligations Supplementary Guidance.
Comments relating to healthcare staffing are
noted but is not an issue the masterplan or Moray
Council can address as it is under the remit of NHS
Grampian. 
A site was identified within MLDP2020 for a GP
surgery at the OPP2 Lennox Crescent site in
MSMP004 Jan
Mcgarrigle
A bigger hospital is needed to provide effective
and efficient care safely to the increasing
population. Dr Grays is unable to cope with
increased population. New housing shouldn’t
be put up with an inadequate NHS provider in
Moray. 
MSMP005 Brenda
Hillson
Concerned about the impacts of 500 additional
houses on GP surgery as the Fochabers Medical
Practice can’t cope already. A new GP surgery
staffed with GPs required. Additional housing
will also overwhelm the school. 
MSMP007 Nicola
Tennant
Masterplan lacks detail on primary health care
provision for new residents. 
MSMP008 Ross Gordon No capacity at doctors, dentists, schools and
other services. More people will also mean
services like bin lorries, gritters that impact on
Council budgets. 
MSMP010 Sophie
Marshall
Queries what will be put in place to support the
expansion of schools to accommodate the
additional children the housing will bring. 
GP service already overstretched, and the new
housing should not impact on current services.
Even if funding is provided, GP recruitment is
an issue. 
MSMP013 Sam Milne Concerned about the capacity of primary and
secondary school but also the condition of the
school. 
There is a lack of capacity in public services –
dentist, hospital etc. Issues with recruitment of
Page 48

Page 49

qualified staff need to be overcome before
adding additional pressure. 
No nursery to provide childcare. 
Support expansion, new jobs and new
opportunities but Council must address issues
that will arise from expansion. 
Fochabers. However, the suitability of the site will
be reviewed as part of the development of the
new Local Development Plan. Opportunities
within the masterplan of a strengthened village
centre could potentially include health care. 
Both Mosstodloch and Milnes Primary School
currently have a school roll that is below the
school capacity. Decisions and planning for the
school will depend on a wider assessment by the
Moray Council learning estates team and the
potential needs arising from the housing land
identified as part of the masterplan process. 
Maintenance of roads is a separate issue and is
not part of the planning process. 
MSMP014 Lindsay
Smith
Welcomes expansion and job opportunities
that would be created but concerned about the
pressure this will put on schools and primary
care/hospitals. Services already overstretched.
People living in the area should be able to live a
satisfactory life with adequate education and
healthcare facilities. Expansion will make
situation worse. 
MSMP009 Russell Adam Schools in Mosstodloch and Fochabers not big
enough to support more pupils.
Shopping facilities will not cope with additional
people.
Road infrastructure is in poor condition. 
Bus services to Elgin are not good. 
MSMP0015 Michael
Thain
Object to proposed masterplan as
apprehensive about current proposal and the
potential implication for the local community
and the environment. 
The scale of development raises concern about
the ability of existing infrastructure to support
growth. Adequate provision of schools,
healthcare facilities and transportation
Page 49

Page 50

networks essential to ensure services are not
compromised. 
MSMP016 Stuart
Hunter
Expansion requires a commitment to redevelop
the existing school. This could be done by
setting a threshold for potential new school roll
as new housing is planned/built. 
Why haven’t Moray Council committed to
identifying and securing an area of land to
replace the existing GP surgery. This should be
closer to Mosstodloch and on the main bus
route. 
MSMP017 Geraldine
Moran
As well as the primary school not being fit for
purpose the same may be said for Milnes High. 
The masterplan does not mention local access
to medical facilities and shops. 
The masterplan states Mosstodloch is 1 hours
from Inverness or Aberdeen.  The bus is closer
to 2 and half hours. Bus services only run once
an hour and on a Saturday there is no bus
around 4/5pm from Aberdeen. 
MSMP020 Innes
Community
Council 
Fochabers Medical Centre is an independent
contractor for the NHS, therefore will it be
necessary to discuss development with NHS
Grampian for a medical facility, or an outreach
facility to cater for up to 1000 new residents? 
Page 50

Page 51

MSMP006 Pat
McDonald
Queries what the strengthened village centre
will comprise of– 
Nursery
New School
Doctor Surgery
Dentist
Amenities for elderly and children? 
The strengthened town centre provides an
opportunity to include a strong mix of community
uses such as those listed alongside enhanced
retail and leisure uses. 
Scale of Development 
MSMP002 Emma Craig  Proposal turns a small, nice village into an
industrial town. 
The masterplan includes a mix of land uses
including residential, industrial, and community
uses. The purpose of the masterplan is to ensure
growth takes place within a planned framework
with key community aspirations reflected. 
Housing 
MSMP013 Sam Milne Housing needs to be balanced between private
and social to allow new homeowners a chance
to buy property.   
The proposed development is likely to provide a
variety of house types and tenures to provide a
mix of development and integrated community.
Providing affordable housing is a key priority for
Moray Council which is reflected within the Local
Housing Strategy. Current planning policy requires
new housing development to provide 25% of the
total units as affordable housing. 
MSMP009 Russell Adam Housing proposals should be for Council to help
ease Council waiting lists. 
Employment Sites 
MSMP0015 Michael
Thain
Object to proposed masterplan as
apprehensive about current proposal and the
potential implication for the local community
and the environment. 
Demand for employment land (class 4, 5 and 6) is
evidenced with the Moray Business Property
Needs Study that was completed in 2023. This
study acknowledges that viability is a barrier to
delivery. However, allocation of land to support
business and industry is required to support the 
Page 51

Page 52

Concerned about the viability of employment
areas due to oversaturation of vacant
businesses in neighbouring towns. Careful
planning is needed and consideration of
demand and feasibility of new employment
areas. 
economy. It is also noted that the timescales of
the masterplan is to 2040 and beyond and
therefore has long timeframe.
MSMP016 Stuart
Hunter
The new spine road from Cowfords roundabout
has no funding or commitment from any
businesses or authorities. 
Employment opportunities should be provided
on LONG 1 with direct access to either or/and
the dualled A96, any additional employment
could be provided on land to the west of I3 and
LONG 2 with direct access to Cowfords
roundabout and the existing bypass which
would direct industrial traffic outwith the
village. 
I2 and LONG2 have direct access to the main
walking and cycling routes and should be longer
term housing sites. 
The masterplan largely reflects the designations in
the Moray Local Development Plan 2020. The
direction of growth in the masterplan for housing
and industrial therefore reflects that approach.
However it is noted that part of I3 is now
proposed for housing on the immediate west of
the settlement. 
Noise, Residential Amenity, Woodland Loss 
MSMP0015 Michael
Thain
Object to proposed masterplan as
apprehensive about current proposal and the
potential implication for the local community
and the environment. 
Noise impacts would be considered at the
planning application stage to ensure the design,
layout and any proposed mitigation can be taken
into account. This is required by NPF4 Policy 23
Health and safety. It is noted that the spine road is
offset from existing housing and is proposed to 
Page 52

Page 53

Potential for noise pollution from spine road.
Increase in traffic and heavy good vehicles
would be disruptive and impacts on quality of
life. 
Comprehensive noise assessment with effective
mitigation required to address adverse impacts
on residents. Prospect of an inactive road being
reactivated is distressing. 
Destruction of Balnacoul Wood behind Forestry
Scotland’s yard is distressing. This space
supports physical and mental well-being and
contributes to biodiversity. Proposals should
include strategies to preserve such areas. 
the north of the settlement in a primarily
industrial area. 
Any future proposals will need to take account of
local residential amenity, both existing and
proposed, as well as mitigate potential impacts
which would be evidenced through supporting
studies which may include noise assessments if
required. It is noted that that the housing
proposal to the south of the A96 would be
accessible to cycle and pedestrians through the
existing underpass and the masterplan does not
propose that this route would be used by
vehicular traffic. 
Development of Balnacoul Woods is not proposed
as part of the masterplan. This is proposed for
environmental improvement/investment with the
focus at Balnacoul Woods around improved
access and paths within the woodland. 
Spine Road and Traffic 
MSMP020 Innes
Community
Council 
Extremely concerned about the increase in HGV
traffic on Garmouth Road (based on Jone's
figures at least 250 HGVs, plus Greens of
Garmouth 30 HGV's). Even with the spine road
from Cowfords, this will create a greater hazard
for the Primary School - Therefore, is a weight
limit ban feasible at the South end of Garmouth
Road? 
Any proposals for development would be
assessed and where these generate a significant
increase in trips a transport assessment will be
required. Any impacts identified will require to
mitigated. 
Development of the spine road will be a
requirement of development. If it is not possible
to deliver the full spine road phasing of industrial 
Page 53

Page 54

The ICC feels that there are serious traffic
management issues within all aspects of the
development, particularly in regard to the
safety of the children attending the primary
school.
development is likely to be from west to east
reflecting the designations within the Local
Development Plan and the timeline within the
masterplan. This would allow for the spine road to
be built out alongside phased development with
only later phases of development being accessed
from Garmouth Road helping to reduce new
industrial traffic going through the village. 
Introducing weight restrictions on the southern
end of Garmouth Road is a separate process to
planning and would require to be considered by
the Council’s Transportation service. However,
the policing of any such restrictions would be by
the Police. It will be important that the spine road
provides an attractive and direct route to
encourage HGV’s to use this. Local businesses,
such as James Jones, will also play in role in
encouraging HGV’s to use the spine road through
their own traffic management plans. 
The proposed spine road is a key intervention
proposed within the masterplan. This will take
traffic away from the village centre including the
school. Individual applications will require to meet
policy requirements in respect of road safety.
Where proposals will generate a significant
increase in trips a transport assessment will be
required. Any impacts identified will require to
mitigated. 
MSMP016 Stuart
Hunter
The new spine road from Cowfords roundabout
has no funding or commitment from any
businesses or authorities. 
Small scale industrial would not attract funding
for spine road. Development proposed to the
west of Garmouth Road would therefore
increase traffic passing the school. The A96
dualling proposals indicated a grade separated
junction on the South of the Village.
Employment opportunities should be provided
on LONG 1 with direct access to either or/and
the dualled A96, any additional employment
could be provided on land to the west of I3 and
LONG 2 with direct access to Cowfords
roundabout and the existing bypass which
would direct industrial traffic outwith the
village. 
I2 and LONG2 have direct access to the main
walking and cycling routes and should be longer
term housing sites. 
MSMP019 Angus Fettes Link road from Cowfords should be a must.
Additional HGV traffic through the village
would be detrimental. 
Page 54

Page 55

MSMP018  James Jones
and Sons
Limited
James Jones and Sons Ltd support the
community engagement led masterplan that
was presented for public consultation on 1st
June 2023. This creates a clear picture of what
the village could be in 2040 and beyond and
serves as a platform to support and balance
business growth and development which in
turn shall benefit the community. 
The proposal to deliver a new spine road from
the Cowfords roundabout to the Garmouth
Road is an aspect of the plan that James Jones
and Sons Ltd recognise and support. However,
given the existing consent to expand James
Jones recommend the route/junction is
amended to join Garmouth Road in line with
proposed new entrance to the sawmill further
north. 
Support for masterplan noted. 
The route of the proposed spine road is subject to
detailed design and the location of junctions will
be reviewed at this point. 
Renewable Energy 
MSMP019 Angus Fettes The Village should benefit from any renewable
plants installed. 
NPF4 Policy 11 Energy states that development
proposals will only be supported where they
maximise net economic impacts, including local
and community socio-economic benefits.
Therefore, proposals that do not benefit the local
area would not be supported. 
Masterplan Consultation 
MSMP0015 Michael
Thain
Lack of adequate notification of residents.
Residents must receive timely and transparent
information about significant development
Crown Estate Scotland have developed the
masterplan following community engagement.
This included promotion of events via a flyer
delivered to 540 addresses in and around the 
Page 55

Page 56

projects that could substantially impact on their
lives and property.
village nine days before the first community event
on 20 and 21st June 2022 (12-7pm). This flyer
included a questionnaire. Adverts were also
placed in the Northern Scot. A second
engagement was similarly promoted by a flyer
sent to addresses in and around Mosstodloch for
an event held on 4th and 5th October (12 to
7pm). In addition to the engagement events at
Speymouth Hall a website provided the option to
view the presentation online. The draft
masterplan and consultation was promoted
through the Council’s social media channels with
the consultation open for 12 weeks for people to
comment. The draft masterplan was also available
to comment on at the LDP event held at Milne’s
Institute on the 22nd June 2023. There have
therefore been several opportunities for residents
to engage and comment on the masterplan.
Landscaping 
MSMP016 Stuart
Hunter
Proposals include landscaping and planting to
enhance entrances and to break up and screen
sites. However, tree planting associated with
the A96 bypass wasn’t completed so why would
residents trust this plan? 
Active travel links already exist from Elgin to
Fochabers and core paths around Mosstodloch.
Provision of landscaping would be a planning
requirement with conditions likely applied to any
planning consents relating to the timing of
provision and ongoing maintenance of this. 
Active travel links noted. 
Surface Water 
MSMP020 Innes
Community
Council 
What serious consideration to the massive
increase in surface and waste water has been
given to the impact on the River Spey? Given
Jones proposals for a suds system within their
new project ?
All development proposals are required to meet
policy requirements in respect of surface and
waste water. This includes NPF4 Policy 22 Flood
risk and water management which requires
development proposals to 
Page 56

Page 57

i. not increase the risk of surface water
flooding to others, or itself be at risk.
ii.  manage all rain and surface water
through sustainable urban drainage
systems (SUDS), which should form
part of and integrate with proposed
and existing blue green infrastructure.
All proposals should presume no
surface water connection to the
combined sewer;
iii.  seek to minimise the area of
impermeable surface. 
Parking 
MSMP020 Innes
Community
Council 
Has provision been made for parking facilities
close to the school/petrol station/store? 
Parking requirements will depend on the uses
proposed and will require to be in line with the
Council’s parking standards set out within the
Local Development Plan. 
Other
MSMP012 Aaron Ralph Tax payer’s money would be better spent on
other projects, including the Cloddach Bridge. 
The masterplan has been landowner led. Delivery
will be dependent on landowners and other
partners. 
Key Agencies and other Stakeholders
Scottish Environment Protection
Agency (SEPA)
Page 59 Black Burn Park - A new area of parkland could be
created at the centre of the new employment sites through
which the Black Burn flows. A large portion of this area is also at
risk of flooding and so the integration of blue / green
infrastructure to accommodate SuDS is important. 
SEPA wouldn’t consider blue/green infrastructure or SUDS an
appropriate flood management technique, whilst we support
Page 59 Black Burn Park – Noted text amended
to acknowledge the flood risk but not linking this
to the proposed blue/green infrastructure or
SUDS.  
Page 22, figure 5 – the shading will be reviewed
to make this clearer. 
Page 57

Page 58

both blue/green infrastructure as a means of active travel and
SUDS for the treatment of surface water run-off. 
Page 22, figure 5 – The shading for flooding is difficult to
interpret. 
Queries if there is a constraints or other background document
that assesses flood risk at a strategic level for Mosstodloch. 
Flood constraints considered through Strategic
Flood Risk for LDP. 
NHS Grampian Notes that the masterplan echoes and aligns with aims of NHS
Grampian: Plan for the Future (2022-2028). 
Dwellings at Mosstodloch will be served by the Fochabers
Medical Practice. At the moment the Practice is over capacity. It
is a concern that the proposed development at Mosstodloch will
put Fochabers Medical Practice further over capacity. To address
the impact on existing healthcare infrastructure contributions
would be required to increase capacity.
Noted. 
The MLDP takes an infrastructure first approach
to ensure that any adverse impact upon existing
infrastructure is mitigated. The Council seeks
developer obligations towards infrastructure
items to mitigate the impact of developments. In
this case, to satisfy policy PP3 Infrastructure and
Services of the MLDP 2020 and NPF4 Policy 18
Infrastructure First, any future proposals will
have to proportionately contribute towards
increasing capacity at Fochabers Medical
Practice.
Archaeology  Welcome that Masterplan provides a clear vision for the
settlement however, currently the draft document is missing
detail on the historic environment and the opportunities some of
those sites may be able to provide (the former railway line being
the most obvious one). 
Notes the recognition that one of the key strengths of the village
is its proximity to local heritage (as noted within the settlement
profile and SWOT Analysis on p19) however, disappointing that
Figure 5 showing the ‘Settlement Network’ only includes point
data from Canmore rather than the polygonised known site
extents available from the Moray Historic Environment Record.
Text added and reference made to Moray
Historic Environment Record.   
The potential requirement for archaeological
evaluation is referenced on page 51. 
Page 58

Page 59

Indeed, within the planning process best practice dictates that
Canmore data is not suitable as a data source in isolation. 
This lack of detailed information on the numerous historic sites
around the village is further emphasised by the two short
paragraphs under the heading ‘Heritage’ on p23 for potential
opportunities and constraints. This omits upstanding features
such as the remains of the Highland Railway Fochabers railway
line, the historic Fochabers Bridge, and the buried features of
the Redhall prehistoric settlement and other cropmark features
that encompass a large part of the northern side of the village.
The lack of consideration of the known historic assets within the
vicinity is reflected in the subsequent options testing where
potential visitor attractions are highlighted. 
Several options (as identified in the Land Schedule Plan page 55)
will have direct impacts on archaeological sites (E3, E4, E5, VC2
for instance) and acknowledgement of these and the
requirement for archaeological mitigation should be included
within the document.
Transport Scotland The development proposals without the A96 bypass include
residential development (R2) located to the south of the existing
settlement and A96(T) and is indicated as being accessed from
the local road network. We note this development is allocated
within the existing LDP as LONG1. The site is separated from the
existing settlement and would require pedestrians, cyclists and
wheelers to cross the A96 to access the main facilities and
amenities using the existing underpass to the north west of the
site. An at-grade crossing facility of the existing bypass would not
be acceptable to Transport Scotland. There is currently no
pedestrian access or crossing facilities to, or at, the Coul Brae
roundabout.  Access to site R2 would not be acceptable from the
A96(T).  
It is noted that pedestrian, cycling and wheeling
access to the R2 (MLDP LONG1) would be via the
existing underpass under the A96 and it is noted
that access from the A96 would not be
acceptable. 
Text added to require further engagement with
Transport Scotland. 
Page 59

Page 60

The National Transport Strategy 2 details that “transport
accessibility will influence the location and design of future
development. Transport will help planning and development and
also ensure our communities are sustainable” and “the transport
system and the consideration of the current and future transport
needs of people will be at the heart of planning decisions to
ensure sustainable places.” 
Careful consideration of where developments should be located
is of key importance. NPF4 promotes developments that
prioritise walking, wheeling and cycling and reduces the need to
travel by unsustainable modes. The consideration of the 20
minute neighbourhood concept is welcomed and Transport
Scotland is supportive of promoting active travel within the
village.   
The development proposals with the A96 bypass include a
tourism/ leisure development (site F on Figure 15). This site is
part of the allocated site LONG1 within the adopted LDP. Access
to this development is not indicated in the land use plan,
however, it should be noted that Transport Scotland would not
support access being taken from the trunk road slip road. While
this site is part of the LONG 1 allocation within the LDP, given the
current status of the A96 project, it may be premature to
promote land directly adjacent to the potential junction. 
Development Opportunity Site (O1), which is allocated as site
OPP1 in the adopted LDP, should be accessed from the local
road network. Transport Scotland would not support access to
the development being taken from the proposed trunk road slip
road. 
Page 60

Page 61

We note the site G6 is for woodland and is to be accessed by
new/upgraded paths and active travel routes. Additionally, the
masterplan details that with the dualling, the old A96 could
accommodate active travel and connect to the existing
underpass and to integrate with new development proposals.
Discussions with Transport Scotland are recommended to
determine any future plans to de-trunk the old A96. 
Historic Environment Scotland Welcome preparation of masterplan and in particular
recognition of the strength and opportunities afforded by the
historic environment in the wider area and the importance of
considering the historic context of the village. 
Long term land not currently proposed in the LDP are unlikely to
impact on any historic assets within HES’s remit. 
Noted
Nature Scot  No comments  
MC Transportation Page 11 – reference to the A96 Corridor Review concluding in
2023 needs to be updated to “awaiting its conclusion”. 
Page 47 – Text to be added noting the draft masterplan included
consultation with Transport Scotland. Reference should also
mention other key consultees including SEPA, NHS Grampian,
Historic Environment Scotland and Nature Scot.   
Page 56/57/58/59 There is a general lack of detail on the existing
and proposed active travel/corepaths networks being proposed,
It is essential to include a plan specifically showing active travel
and where there are cyclepath/ corepaths/ footways etc, where
the issues are in terms of providing the appropriate level of
connectivity and where new provision is proposed. The
Delegated authority sought to amend
masterplan. 
Page 61

Page 62

masterplan requires to be updated to include the widening of
Garmouth Road and providing a 3m shared use cyclepath (as
required for James Jones application) and to add the completed
section of cyclepath on Stynie Road. The core path through the
western edge of Mosstodloch needs to be provided as a 3m wide
shared use cyclepath from the Old A96 up to the spine road. 
Page 57 – Items 15 and 16 requires to be caveated given the
outcomes of the A96 Corridor Review have not concluded. 
Page 57 – Item 17 should refer to the appendix with walkable
distances to existing public bus stops and potential bus routes. 
Page 59 - Text should be added to Item 7 to state “Upgrading of
existing and provision of new remote foot and cyclepaths will
need to be developed and agreed through detailed planning
applications.” 
Page 68- The programming of the A96 needs to be caveated as
this is currently unknown. 
Page 70 -The actions on page 70 need to be updated with a
caveat around the A96 as until such time that a design for the
A96 dualling is available, it is unclear as to whether active travel
infrastructure to cross the dualled A96 can be provided.
Transport Scotland are encouraged to provide an appropriate
level of active infrastructure as part of their design. 
Page 73 - Rather than describe as “alternative route” the routes
should be referred to as “potential bus route”. 
MC Open Space, Access and
Policy Officer 
The Draft Masterplan key sites feature 10 shows a paths network
based on existing and proposed routes. The existing routes seem
to relate to the Core paths network in and around the
Mapping has been updated. 
Page 62

Page 63

settlement. It would be helpful if the existing Core Paths were
highlighted on the map and the new proposed path
developments were highlighted separately. This would better
show what the aspirations are for expansion of the network. 
Page 63

Page 64

Page 64

Page 65

MOSSTODLOCH2040 Masterplan Report
1
DRAFT
Masterplan Report
May  2024
DRAFT
Item 6
Page 65

Page 66

Mosstodloch 2040 is a community engagement-led masterplan for Mosstodloch, Moray. This
process has sought the views, opinions and ideas of local people in the context of what their
vision for ‘what the village could be’ in 2040 and beyond.
This Masterplan Report records the engagement process and its high-level outcomes. It
demonstrates how engagement with the local community and stakeholders has directly informed
the proposals for the village, which could be implemented over the next 5, 10 or 20+ years.
DRAFT
Revision:Revision: JJ
Author:Author: JFJF
Checked by:Checked by: STST
Authorised by:Authorised by: STST
Issue Date:Issue Date: May 2024May 2024
Page 66

Page 67

Contents
Opportunity and Vision   05
01 Introduction     09
02 Settlement Assessment   14
02 Community Engagement  27
04 Options Testing    36
05 Village Masterplan   50
06 Action Plan & Timescales  68
DRAFT
Page 67

Page 68

MOSSTODLOCH2040 Masterplan Report
4
DRAFT
Page 68

Page 69

MOSSTODLOCH2040 Masterplan Report
5
DRAFT
Opportunity and Vision
In our view, a key aim of the engagement and masterplan
process was to provide the structure for Crown Estate
Scotland, the local community and other key stakeholders
to reach consensus on both the big questions of strategic
direction and the identification of localised placemaking and
economic development opportunities.
The way in which we live and choose to live is changing.
Each place and its community will have a different range of
opportunities and threats which it must identify and deal
with in order to maximise its potential and sustain a high-
quality environment for living, working and enjoying. Some
key considerations include:
• Post Covid living and working
• Sustainable living and the journey to net zero carbon
• Tourism and economic opportunities, both now and
following the A96 dualling
• A focus on community ownership
Vision
This engagement-led masterplan process sought to draw out
from the community its aspirations for what Mosstodloch
could be. This was framed by considering what Mosstodloch
could be in 2040 and beyond. In order to achieve the
intended outcomes the building blocks must be put in place
now and the first steps must be taken.
Crown Estate Scotland control a large
amount of land around Mosstodloch
which includes many of the allocated
sites for development identified in the
Moray Council Local Development Plan
(LDP). The LDP requires a masterplan to
be prepared for the land to the south of
the A96. However, given their wider land
holding, Crown Estate Scotland wanted
to prepare a wider masterplan that
considered the whole village and that
was shaped by the community.
They have sought to ensure that the
Masterplan has been prepared on the
basis of collaboration and recognition
that all parties need to work together to
develop and maximise the opportunities.
Often there is a key driver that instigates change and requires
a masterplan process to help shape a place for the future
i.e. the need for regeneration of housing / delivery of new
housing or inward investment for business and employment.
In the case of Mosstodloch, it feels as though this is the right
point in time for a pro-active plan to map the future of the
village, one that maximises a range of opportunities, working
with all stakeholders to recognize both historic and some
that are only now beginning to present themselves.
Mosstodloch should be:
• a place with a choice of good homes for all sections
of the community. 
• a place with a heart where a growing community
can come together and interact.
• a place that is designed for people movement
• a place that provides the opportunity to work
locally.
• a place that is well connected with its environment.
• a zero carbon place.
NPF4
This report recognises the recent adoption of National Planning
Framework 4. NPF4 places the climate crisis and biodiversity
interests front and centre and in this regard the delivery of
any aspects of the Mosstodloch Masterplan (or a potential
future Local Place Plan) will need to meet these nation policy
requirements.
The engagement-led masterplan process set out within this
document is a first step towards positive change and seeks to
support community wealth building through a people-centred
approach to local economic development that would address
economic disadvantage and inequality and provide added
social value.
The masterplan supports the concept of 20-Minute
Neighbourhoods / Local Living by ensuring a mix of uses is
sustained in the village (homes, jobs, local retail, community
/ education and high-quality open spaces)which are easily
accessible through a well-connected path / active travel
network.
Page 69

Page 70

MOSSTODLOCH2040 Masterplan Report
6
DRAFT
Page 70

Page 71

MOSSTODLOCH2040 Masterplan Report
7
DRAFT
01  Introduction
Page 71

Page 72

MOSSTODLOCH2040 Masterplan Report
8
DRAFT
Page 72

Page 73

MOSSTODLOCH2040 Masterplan Report
9
DRAFT
Crown Estate Scotland commissioned Barton Willmore,
now Stantec, to talk with the community in Mosstodloch
to understand what’s important to people locally and help
make a plan for the village over the longer term.
Mosstodloch 2040 is a project which has collected ideas and
insights from local people, and used them to prepare a plan
for what should happen here over the next 20 years.
01 Introduction
We sought to listen to everyone in the community about:
• what works well / less well within the village; and
• which things they would like to change, or see happen,
that might make the village a better place to live, work
and enjoy spending time
In the course of the project, we tested options and ideas with
the community that considered:
• potential development sites, most of which were already
identified for development in Moray Council’s LDP;
• opportunities for placemaking improvements; and
• what opportunities or issues there might be for the village
following the dualling of the A96, which would include a
junction at Mosstodloch.
BASELINE
ANALYSIS
APR / MAY
Information gathering and
community capacity building
JUN
STAGE ONE
Local
Businesses
Engagement
STAGE TWO
OCT JUL / AUG
OPTIONS
TESTING
STAGE THREE
NOV / DEC NOV / DEC
MASTERPLAN
& REPORT
STAKEHOLDER
&  COMMUNITY
FEEDBACK
Explore Potential of Local Place
Plan with the Community
DESIGN
CONCEPTS
AND DRAFT
ACTION PLAN
Access &
Connectivity
Physical
constraints &
opportunities
Community
infrastructure
Vision setting and
options testing
Drop-In
Community
Event
Leaflet Drop
& Advert
COMMUNITY
EVENT
COMMUNITY
EVENT
Masterplan and Emerging
Local Place Plan
Masterplan Options
& Testing
Stakeholder
Engagement
Local
Businesses
Engagement
Drop-In
Community
Event
Leaflet Drop
& Advert
Draft Village
Masterplan Report
Submitted to
Moray Council
Workshops
Page 73

Page 74

MOSSTODLOCH2040 Masterplan Report
10
DRAFT
MOSSTODLOCH
© Crown copyright [and database rights] 2020 OS 100023422 Moray Council
Preferred A96 dualling
route option
FIGURE 1: LDP ALLOCATIONS MAP (2018)
Key
Allocated Housing
Allocated Mixed-Use
Allocated Opportunity Site
Allocated Employment
Allocated Tourism
Open Space
Page 74

Page 75

MOSSTODLOCH2040 Masterplan Report
11
DRAFT
PLANNING CONTEXT
The current LDP was adopted in 2020 and is expected to be
renewed in the coming years, meaning that this engagement-
led masterplan process is timely. Also,despite some sites
being in successive plans these have not been developed.
We believe that this is a logical starting point to test the areas
identified and the mix of land uses.
A96 Dualling
Scottish Government’s Infrastructure Investment Plan (2011)
contained a commitment to complete the dualling of the A96
between Inverness and Aberdeen by 2030, thus completing
the dual carriageway network between all Scottish cities.
Since 2011 a range of assessment and options have been
tested and consulted upon. In 2019 a preferred option was
identified and ground investigations took place in 2020.  For
Mosstodloch, the relevant section of the project is the 46km
A96 Dualling Hardmuir to Fochabers scheme.
The overall ‘A96 Corridor Review’ is ongoing and expected to
conclude in 2023.
FIGURE 2: TRANSPORT SCOTLAND A96 DUALLING - MOSSTODLOCH JUNCTION  (DESIGN UPDATE OCT 2019)
Page 75

Page 76

MOSSTODLOCH2040 Masterplan Report
12
DRAFT
Page 76

Page 77

MOSSTODLOCH2040 Masterplan Report
13
DRAFT
02  Settlement Assessment
Page 77

Page 78

MOSSTODLOCH2040 Masterplan Report
14
DRAFT
02 Settlement Assessment
Location
Mosstodloch is a village located
approximately half way between Aberdeen
(80km) and Inverness (70km). It lies in close
proximity to Fochabers, 10km from Elgin and
just 5km from the Moray Firth coastline.
It sits on the old A96 which has historically
been the main east-west route through
Moray connecting Aberdeenshire and the
Scottish Highlands.
FIGURE 3: STRATEGIC LOCATION PLAN
Aberdeen
Inverness
Mosstodloch
A96
A95A9
A96 A90
Fraserburgh
Aviemore
Cairngorm National Park
Elgin
Page 78

Page 79

MOSSTODLOCH2040 Masterplan Report
15
DRAFT
Mosstodloch
Lhanbryde
Rothes
Fochabers
Lossiemouth
Garmouth
Kingston
Elgin
Findochty
Portknockie
Cullen
Buckie
Keith
FIGURE 4: SETTLEMENT NETWORK
Page 79

Page 80

MOSSTODLOCH2040 Masterplan Report
16
DRAFT1871 1903 1968
Page 80

Page 81

MOSSTODLOCH2040 Masterplan Report
17
DRAFT
Historical Context
Mosstodloch started as a small linear village set along an
historic east-west route through Moray and at a crossing
point over the River Spey. It was also influenced by its close
proximity to the nearby market town of Fochabers.
The 1960s saw the start of its growth which saw two large
employers and several phases of residential development
established.
The River Spey
The River Spey runs to the east of Mosstodloch and
historically supported many local industries, including
Garmouth - at one stage the shipbuilding capital of Britain -
and for distilleries across Speyside.
Today, locally, it serves as an important recreational
resource providing a wide network of walking routes.
The A96
The historic A96 east-west route was diverted and formed
a by-pass to Mosstodloch and Fochabers in 2011 and 2012
respectively.
The A96 serves as a major road in the north of Scotland,
running from Aberdeen to Inverness.  The dualling
programme will deliver a number benefits including
improved journey time and reliability, delivering economic
growth, improved connectivity and reduce the rate and
severity of accidents.
Residential Growth / Phases / Neighbourhoods
Residential growth in Mosstodloch was led by ribbon
development along the old A96 in the late 1800’s/early 1900’s.
Development continued in Mosstodloch with the opening
of a public house, petrol station and sawmill throughout the
early and mid 1900’s.  
Residential growth continued largely in the form of linear
development, until the 1960’s, when a neighbourhood
development between Garmouth Road and Stynie Road
was established. This saw the beginning of neighbourhood
developments which supported the growing sawmill
business (established in 1956) and latterly the Baxters’ Food
Factory (1960s).
Additional neighbourhoods emerged throughout the 1970s
around Birnie Place, Pinewood Road and Mossmill Park, with
Mosstodloch expanding to the east and west.
Little residential development took place between the 1980
and 2020 until the recent development off Stynie Road and
north of Mossmill Park was completed.
In summary and as identified above, the village has five
distinct zones / character areas:
• The main street / cross (historic core of the village)
• Glebe Road / Dene Place (1960s)
• Pinewood Road (1970s)
• Birnie Place / Stynie Road (1970s)
• Mossmill Park (1970s)
• Speymouth Drive Phase 1  (2020)
It is clear that the majority of the village’s residential growth
took place in the 1960s / 1970s and will have supported
the growth of the two local large businesses. At this time,
the local primary school and Speymouth Hall were built
to serve the community but the village never developed a
true ‘centre’ or ‘high street’, tending instead to use nearby
Fochabers for additional shops and services.
Page 81

Page 82

MOSSTODLOCH2040 Masterplan Report
18
DRAFT
Profile and SWOT Analysis
An assessment of the villages Strengths, Weaknesses,
Opportunities and Threats (SWOT) was undertaken to inform
the engagement and masterplan process.
Statistics
• Approx 1k population (1,022)
• Village with 448 Households
Health Services
• Fochabers Medical Practice (5-min drive)
• Seafield Hospital in Buckie (10-min drive) / Dr Gray’s
Hospital in Elgin (15-min drive)
Education
• Mosstodloch Primary School (10-min walk for whole
village)
• Milnes High School in Fochabers (30-min walk)
Local Amenities
• Petrol filling station with local shop
• Post office (located in local shop)
• Three retail units (beauty treatment, laundrette and a
vacant unit)
Placemaking Objectives (Moray LDP)
• Identify longer term housing and employment areas
• Identify an additional 10ha for employment and support
proposals for business development and growth.
• Highlight potential of longer term site for large scale
inward investment.
• Enhance the approaches to the settlement through
landscaping and planting including the characteristic
beech hedging.
Page 82

Page 83

MOSSTODLOCH2040 Masterplan Report
19
DRAFT
Opportunities
Links to surrounding hubs via A96
Rural setting and close proximity to
the coast
Walkable village
Proximity to local heritage
Village centre
Green Infrastructure
1hr to Aberdeen/Inverness
Outdoor activities
Greenfield land
Tourism
River Spey
Gordon Castle Estate
No high street / close proximity to Fochabers
Lack of local services
Walkability (outwith village)
Transport
Varied local character (separate / distinct)
neighbourhoods)
Lack of employment diversity
Decreasing population
Ageing population
Mosstodloch has a higher proportion of households
(27.5%), where all residents are aged 65 and over, than
Moray (23.4%) and Scotland (20.9%) reinforcing the
population profile
16.7% of population without access to car
Only 57% of 16/17 year olds in education
Health of Population
Threats
Strengths Weaknesses
Mosstodloch Cross / Village Centre
Mosstodloch Primary School
Page 83

Page 84

MOSSTODLOCH2040 Masterplan Report
20
DRAFT
Sustainability Assessment
The following section provides the zero carbon context and
masterplan objectives.
Placemaking Objectives
• Identify longer term housing and employment areas
• Identify an additional 10ha for employment and support
proposals for business development and growth
• Highlight potential of longer term site for large scale
inward investment
• Enhance the approaches to the settlement through
landscaping and planting including the characteristic
beech hedging
Relevant Design Principles
• Active travel routes and linkages to existing Core Paths
and cycle routes
• Opportunity to improve ‘Street Space’ within
Mosstodloch to enhance spaces for people and re-
prioritise these over the movement functions
• Create /enhance pocket parks & neighbourhood parks
• Landscaping used to break up sites and provide
screening to existing residential areas and employment
uses
• Reinforce woodland boundaries
• Create new cycle path routes
• Safe routes to schools and local shops
Policy Context
The Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019
• Net-zero greenhouse gas emissions by 2045
• Interim targets, to reduce greenhouse gas emissions 
» 56% by 2020
» 75% by 2030
» 90% by 2040
• All new homes consented from 2024 to use zero
emission heating
• All buildings to achieve a good level of energy efficiency
• Reduce car kilometres by 20% by 2030
• Phase out the need for new petrol and diesel cars and
vans by 2030
• Continue to embed circular economy principles into
the wider green recovery and take steps to reduce food
waste
Moray Climate Action Plan
• Aim to achieve zero carbon standards in all new
buildings, including housing and schools
• Council to develop and adopt design standard for
sustainable construction and maintenance i.e. increase
in % of recycled and sustainable material used in
construction
• Continue to encourage a reduction of waste arising’s (top
of waste hierarchy) and thereafter increase recycling
rates
• Promote sustainable urban drainage systems
incorporating blue and green networks in all new
developments
• Safeguard existing woodlands and promote additional
planting in all new developments
• Ensure new developments make provisions for Electric
Vehicle Charging facilities, including communal charging
facilities where no on-plot parking is available
• Ensure all new developments make provisions for Cycle
Parking, including secure cycle parking for flats and
properties with no gardens   
Zero Carbon Objectives for Masterplan
1. Develop a low carbon renewable energy strategy for
new development
2. All new dwellings will undergo an assessment to mitigate
overheating risk, ensuring a thermally comfortable home
3. All new houses to be provided with a 7kW electric vehicle 
charging point and potential for existing homes to be
investigated
4. All dwellings to achieve minimum B rated EPC to ensure
no new home will be the cause of fuel poverty
5. All new dwellings to achieve a 10% reduction  in energy
demand by fabric efficiency measures over Building
Regulation Section 6 – new technical handbook to apply
from 1 October 2022
Page 84

Page 85

MOSSTODLOCH2040 Masterplan Report
21
DRAFT
6. Half of regulated energy demand met by on-site PV
provision in line with the Scottish Government’s energy
strategy
7. Creation of delivery hubs/lockers in convenient locations
e.g., within local centre to reduce ‘last mile’ emissions
8. Creation of safe active travel networks – if feasible,
provide cycle paths separated from road to access local
centre and main employers (Baxter’s & Sawmill) from the
entrance of each new settlement/phase
9. Commit to undertake a circular economy assessment
Supporting sustainability objectives for masterplan
a. Developers/contractors to provide apprenticeship
opportunities
b. Any new large commercial uses  to consider inclusion of
small units for flexible/community uses
c. Provide facilities for local food growth and reduction of
food waste
d. Collaborate to improve and enhance new and existing
green infrastructure including active travel routes
e. Ensure that development and associated projects
prioritise native species with a biodiversity net gain
Page 85

Page 86

MOSSTODLOCH2040 Masterplan Report
22
DRAFT
Proposed A96
Dual Carriageway
James Jones
& Sons
Baxters
Village CentrePrimary School
A96
Cowfords
Roundabout
B9015
B9015
B9015
The Speymouth
Parish Church
FIGURE 5: SETTLEMENT NETWORK
Coul Brae
Roundabout
Fochabers
B
B
B
B
BB
B
B
River Spey
Key
Flooding
5m Contour
Allocated Housing
Allocated Mixed-Use
Allocated Opportunity Site
Allocated Employment
Allocated Tourism
Open Space
Listed Building
Canmore - details available 
from the Moray Historic
Environmental Records
Conservation Area
Garden & Designed Landscape
Path Network
Bus Stop
800m (10-minute walking distance)
1600m
(20-minute walking distance)
B
400m (5-minute walking distance)
Page 86

Page 87

MOSSTODLOCH2040 Masterplan Report
23
DRAFT
Opportunities and Constraints
The village and its surrounding area has been assessed at a
high-level to identify potential opportunities and constraints
to physical development.
Local Plan Allocation
Land allocations identified in the 2020 LDP broadly reflect
those identified in the previous plan. Testing the extent
and location of these uses will be a critical part of the
engagement and masterplan process to test whether they
could adapt to better support community aspirations and be
more attractive to the market.
Flooding
There are areas of flood risk alongside the River Spey which
do not affect the settlement to any great extent. However,
there are areas of flood risk to the west of the village and
within an area of land identified for future employment use.
Landscape
Mosstodloch has a beautiful landscape setting which
is largely defined by the River Spey and large areas of
woodland, many of which are commercial forests of Scots
pine. While the village is located on relatively flat coastal land 
on the edge of the Moray Firth, there are views of higher
ground to the south.
Heritage
There is one listed building within Mosstodloch (Cosy
Corner) and three located off Stynie Road to the North of the
settlement, including The Speymouth Parish Church. There
are no Conservation Areas (CA) within Mosstodloch.
East of Mosstodloch is Fochabers CA and the Gordon Castle
Garden and Designed Landscape.  Other opportunities
include upstanding features such as the remains of the
Highland Railway Fochabers railway line, the historic
Fochabers Bridge, and the buried features of the Redhall
prehistoric settlement and other cropmark features that
encompass a large part of the northern side of the village.
Access and Movement Networks
Walking and Cycling
A number of Core Paths combine to form a broad loop
around the north of the village while the Speyside Way is
located on the eastern side of the river. Beyond this there is a
further network of woodland walks.
An active travel route has recently been completed that
connects from Mosstodloch village to Elgin and comprises of
a cycle path which is largely off-road.
Vehicles
The village by-pass constructed in 2011/12 saw the A96
diverted away from the village centre and significantly
reduced the amount of traffic within the settlement.
Mosstodloch Service Station is still located in the village
centre and draws in vehicles from the A96 as well as from
the local network.
James Jones and Sons Ltd Sawmill also generates vehicle
movements within the village which draws Heavy Goods
Vehicles (HGVs) up Garmouth Road and past the Primary
School.
Baxters has its own direct access from the A96 via the Coul
Brae Roundabout.
A96 Dualling
The Mosstodloch junction of the proposed A96 dualling is
located south of the village and will connect with the B9015.
20-Minute Neighbourhood
Local Facilities and Amenities
Within Mosstodloch (800m / 10-minute walking distance):
• Primary School
• Speymouth Hall (community hall)
• Mosstodloch Service station with mini-market and Post
Office
• Laundrette
• Beauty Salon
• Scout Hall
• Park (at Speymouth Hall) with playing pitches and
equipped children’s play area
Additionally, within Fochabers (2400m / 30-minute walking
or 10-minute cycle distance):
• Library
• Leisure facilities
• Fochabers Medical Practice
• Milnes High School
Page 87

Page 88

MOSSTODLOCH2040 Masterplan Report
24
DRAFT
Page 88

Page 89

MOSSTODLOCH2040 Masterplan Report
25
DRAFT
03  Community Engagement
Page 89

Page 90

MOSSTODLOCH2040 Masterplan Report
26
DRAFT
Page 90

Page 91

MOSSTODLOCH2040 Masterplan Report
27
DRAFT
Speymouth Hall Committee
Contact was made with the Speymouth Hall committee
which helped provide background information on
community infrastructure and networks within the village.
It was also clear that the hall, and its committee, provide an
important function within the community.
Choosing a Location for the Engagement Event
Informed by sites visits and discussions with community
representatives it was agreed that a single location for a
drop-in event over two days was the best way to invite the
community to speak with the team. While not geographically
central to the village, Speymouth Hall was an obvious choice
of venue in which to base the in-person event.
The Launch Event
As the project was unknown to the community, the initial
engagement exercise was advertised as a ‘launch event’
so that local people would understand straight away that
the process was just getting underway and that this was the
initial opportunity to get involved.
Leaflet Drop & Questionnaire
A double sided flyer was produced which:
• notified the community of the first engagement event;
• gave an introduction to the project and team; and
• included  a short questionnaire to help our initial
information gathering exercise.
Stage One
Stage One engagement ran from May to July 2022 and
comprised the information gathering and baseline analysis
part of the engagement / masterplan process. This
engagement was also undertaken to help with ‘community
capacity building’ in that it could provide information and
understanding around the local planning context and how a
masterplan might fit with that process going forwards.
During the early part of this engagement the project
team sought to make contact with groups and prominent
individuals from within the community that could help the
team structure and organise the first round of engagement
events
Seeking to Establish a Community Steering Group
Given the low level of representation for Mosstodloch within
the Community Council the project team sought to identify
members of the community as first contacts to explain the
project and the engagement strategy. This process offered
an opportunity for individuals to join a Community Steering
Group that could inform the process and act as a conduit
between the project team and community to gather and
circulate information.
However, during the early weeks of the project it became
clear that a formal steering group would not be formed
initially and it was more likely to develop during the course of
the project with the hope that by the end a group would be
in place that could help steer delivery of recommendations
resulting from this process.
The flyer was delivered to 540 addresses in and around
the village approximately nine days before the community
engagement event at Speymouth Hall on 20 and 21 June 2022.
Newspaper Advert
A advert was placed in The Northern Scot weekly
newspaper on Friday 10 June, nine days before the
community engagement event.
Website
A website was created (www.Mosstodloch2040.co.uk)
which gave a background to the project and team,
information relating to the two day event and included an
on-line version of the short questionnaire.
2-Day Community Engagement Session
On 20 and 21 June the community engagement event was
held at Speymouth Hall in the Mosstodloch. It took place
between 11am and 6.30pm on each day.
The event gave the team the opportunity to introduce the
project and explain what it hoped to achieve and how the
community could play a central role. The team explained
that the launch event was an information gathering / fact
finding exercise to better understand Mosstodloch.
The primary engagement method used was to record
comments made during conversation on a series of maps
and plans that identified opportunities and issues within the
village.
Questionnaires and feedback forms were also available for
those attending to complete.
03 Community Engagement / Community Capacity Building
Page 91

Page 92

MOSSTODLOCH2040 Masterplan Report
28
DRAFT
Page 92

Page 93

MOSSTODLOCH2040 Masterplan Report
29
DRAFT
What is the Best Thing About Mosstodloch?
A summary of the most common responses:
• Quiet and friendly
• Rural setting and access to countryside
• Walkable neighbourhood i.e. close proximity to shops
and facilities (school / hall)
• Shop / Post Office / petrol filling station
What Might You Change about Mosstodloch?
A summary of the most common responses:
• A (better) centre / heart of the village
• Better connectivity (e.g. Garmouth via cycle path)
• More shops
• A cafe - informal meeting place
• More things to do for all ages
• More things for young people to do (skate park etc.)
• Improve certain areas of green space and provide areas
for sitting
• New school
• Reduce traffic
• Remove speed bumps
• More facilities for all ages
• A pedestrian crossing at the school
• No more new houses
• More new houses for sale
• Less council houses
• Maintenance - less litter / weed killing
• Create a better sense of pride
• New road into saw mill
Stage One Feedback
Website activity
• w/c 27 June - 139 users / 166 sessions
• w/c  July - 152 users / 184 sessions
Questionnaire Feedback
Through the flyer drop and the website the team received 26
completed questionnaires.
Page 93

Page 94

MOSSTODLOCH2040 Masterplan Report
30
DRAFT
FIGURE 6: QUESTIONNAIRE FEEDBACK BAR CHARTS
New Homes New Employment opportunities New / Improved Community Facilities
Improved Green Spaces Additional Green Spaces Connectivity
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
0
1
2
3
4
5
6
7
8
0
1
2
3
4
5
6
7
8
0
1
2
3
4
5
6
7
8
0
1
2
3
4
5
6
7
8
More ImportantLess Important
No. of Responses
More ImportantLess Important More ImportantLess Important
More ImportantLess Important More ImportantLess Important More ImportantLess Important
No. of Responses
Page 94

Page 95

MOSSTODLOCH2040 Masterplan Report
31
DRAFT
How important do you think the following are to
Mosstodloch over the next 20 years?
• New homes
• New employment opportunities
• New/improved community facilities
• Improved green spaces
• Additional green spaces
• Connectivity
The results from c.18 completed questions showed that
the community strongly supports the  enhancement of
green spaces, improved connectivity and new / improved
community facilities. They also largely supported new
employment opportunity while less considered new housing
as important. With that said, it was acknowledges that new
homes and a growth in population would help support the
enhancements / improvements within the village.
SCORE New Homes New
Employment
Opportunities
New/Improved
Community
Facilities
Improved
Green Spaces
Additional
Green Spaces
Connectivity
no. of responses no. of responses no. of responses no. of responses no. of responses no. of responses
1 - Least Important 8 3 0 3 3 0
2 5 3 5 4 4 3
3 1 4 5 3 2 4
4 2 4 3 3 2 7
5 - Most Important 4 8 8 7 8 8
more
important -
6 responses
less     
important -
13 responses   
more
important -
12 responses
less     
important -
6 responses   
more
important -
11 responses
less     
important -
5 responses   
more
important -
10 responses
less     
important -
7  responses
more
important -
10 responses
less     
important -
7 responses   
more
important -
15 responses
less     
important -
3 responses   
FIGURE 7: QUESTIONNAIRE FEEDBACK TABLE
Page 95

Page 96

MOSSTODLOCH2040 Masterplan Report
32
DRAFT
Page 96

Page 97

MOSSTODLOCH2040 Masterplan Report
33
DRAFT
Stage One Conclusion
Recurring Themes
• New village heart
• Social hub
• Green walkable connections
• Clear signage (walking paths, locations etc.)
• Reducing traffic in the village centre*
• Preserve “intimately rural” setting
• Increase retail offering
• Greater variety of things to do
• Improved green / community space(s)
*While comments were provided regarding ‘reducing traffic in the
village centre’, subsequently it has been considered reasonable that
this about both reducing the amount of large vehicles in the village and
road safety more generally.
Page 97

Page 98

MOSSTODLOCH2040 Masterplan Report
34
DRAFT
Page 98

Page 99

MOSSTODLOCH2040 Masterplan Report
35
DRAFT
04  Option Testing
Page 99

Page 100

MOSSTODLOCH2040 Masterplan Report
36
DRAFT
04 Options Testing
A series of options were derived from the earlier
community and stakeholder engagement. They all
shared common themes that responded to the key
issues and observations that emerged during this
earlier process. As these were drawn up they were
streamlined into three broad options that sought
to explore land use and place improvements
from a minimal / do less approach to a maximum
/ do more approach. To be clear, there is no
commitment from Crown Estate Scotland to deliver
any or / all of the options, however they were keen
that the ideas expressed locally were accurately
captured in the options exercise. 
A Partnership Approach to Delivery
Crown Estate Scotland cannot deliver all elements
of the masterplan options in isolation but will need
to work in partnership with the community and
other key stakeholders and landowners.
LDP Allocations
For reference, Figure 8 opposite identifies the
adopted LDP (2020) land allocations.
• Housing site at Garmouth Road
• Employment site north of Baxter’s
• Employment site(s) west of Mosstodloch
• Mixed use site south of A96
• Opportunity site at Balnacoul
1
1
2
2
3
3
3
4
4
5
5
FIGURE 8: LDP ALLOCATIONS
Saw Mill
Baxter’s
Village Centre
River Spey
A96
B9015
Stynie Rd
Garmouth Rd
Housing
Employment
Tourist Attraction
Key
School
Cowfords
Roundabout
Coul Brae
Roundabout
Page 100

Page 101

MOSSTODLOCH2040 Masterplan Report
37
DRAFT
Option 01
Delivering Current LDP Allocations
Option 01 would see the current LDP
allocations taken to market for delivery
with potential for only limited village-wide
/ community infrastructure interventions /
improvements given uncertainty of delivery
(allocations carried over from previous LDP).
• Limited environmental improvements at
village centre
• Improvements to primary school /
community infrastructure on existing site*
• Create a Northern Green Loop for walking
12
3
3
1
2
3
FIGURE 9: OPTION 01
* currently there is not commitment from Moray Council to build a new school
Saw Mill
Baxter’s
Village Centre
River Spey
A96
B9015
Stynie Rd
Garmouth Rd
Housing
Employment
Tourist Attraction
Nature Play and Recreation
Key
Cowfords
Roundabout
Coul Brae
Roundabout
Page 101

Page 102

MOSSTODLOCH2040 Masterplan Report
38
DRAFT
Option 02
Supporting an Enhanced Village Centre
Option 02 seeks to deliver tangible improvements
at the centre of the village by re-routing HGV traffic
to a new ‘spine road’ providing access to the JJS
saw mill as well as future employment sites.
• New ‘spine’ from Cowfords roundabout to
Garmouth Road removing HGV traffic from the
village centre
• Enhance the village centre 
• Improvements to / expansion / redevelopment
of primary school / community infrastructure
on existing site*
• Create a Northern Green Loop for walking
• Local (vehicle) access only beyond The
Speymouth Parish Church to create a
pedestrian and cycle friendly route to
Garmouth / Kingston
1
12
2
3
3
4
4
4
5
5
FIGURE 10: OPTION 02
* currently there is not commitment from Moray Council to build a new school
* *any changes to road traffic arrangements / restrictions will need to be explored further with Moray Council
Saw Mill
Baxter’s
School
River Spey
A96
B9015
Stynie Rd
Garmouth Rd
Housing
Employment
Tourist Attraction
Nature Play and Recreation
Key
Village CentreCowfords
Roundabout
Coul Brae
Roundabout
Page 102

Page 103

MOSSTODLOCH2040 Masterplan Report
39
DRAFT
Option 03
Option 03 considers further opportunities
relative to the potential dualling of the A96.
• A96 Dualling
• New ‘spine road’ from Cowfords roundabout
to Garmouth Road removing HGV traffic from
the village centre
• Employment and residential development to
the north and west
• Enhance and extend the village centre
• Improvements to / expansion /
redevelopment of primary school /
community infrastructure on existing site*
• Mixed-use development
• Potential for Visitor Centre/Cafe
• Create a full Green Loop for walking
• Local (vehicle) access only beyond The
Speymouth Parish Church to create a
pedestrian and cycle friendly route to
Garmouth / Kingston**
1
1
1
2
2
3
334
5
6
6
7
78
8
8
8
8
9
9
45
FIGURE 11: OPTION 03
* currently there is not commitment from Moray Council to build a new school
* *any changes to road traffic arrangements / restrictions will need to be explored further with Moray Council
Saw Mill
Baxter’s
Village Centre
School
River Spey
A96
B9015
Stynie Rd
Garmouth Rd
Cowfords
Roundabout
Coul Brae
Roundabout
Housing
Employment
Tourist Attraction
Nature Play and Recreation
Key
Page 103

Page 104

MOSSTODLOCH2040 Masterplan Report
40
DRAFT
Page 104

Page 105

MOSSTODLOCH2040 Masterplan Report
41
DRAFT
Stage 2 - Community Options Testing
2-Day Community Engagement Session
On 04 and 05 October, the second community engagement
events were held at Speymouth Hall in the Mosstodloch. It
took place between 12 noon and 7pm on each day.
Exhibition boards were used to present feedback and three 
high-level masterplan options. The team used the boards to
explain the process and discuss the relative opportunities of
each option.
Questionnaires were then used to record options and
comments on each of the options.
Quiet and friendly
Page 105

Page 106

MOSSTODLOCH2040 Masterplan Report
42
DRAFT
Selection of Exhibition Boards from the Second Community  Engagement Event
Page 106

Page 107

MOSSTODLOCH2040 Masterplan Report
43
DRAFT
Page 107

Page 108

MOSSTODLOCH2040 Masterplan Report
44
DRAFT
Stage 2 Event Statistics
• Approx. 60 people attended over two days
• 17 completed questionnaires
• 65% of visitors had attended the first event / 35% of visitors engaging for first time
• 63% agreed with feedback gathered from first event / 31% neither agreed nor disagreed
/ 6% disagreed
Questionnaire Feedback
Are there any other opportunities and issues that you think this masterplan
process should consider?
A summary of the most common responses:
• Keep traffic away from village centre
• Do not trap housing between industrial areas
• Potential for pharmacy / health care
• Need to strike balance between employment and environment
• More private homes needed
• Housing for older people
• James Jones shouldn’t expand and should move
• Too much employment / commercial land for size of village
• More employment opportunities
• Character of the village should not be lost
• Enhance small green space east of the garage
• Improve digital infrastructure
Page 108

Page 109

MOSSTODLOCH2040 Masterplan Report
45
DRAFT
Option 1
Agree Disagree Neither
10 1 4
66% 7% 27%
Comments from the community
• Village works well as is, but good to plan
for future
• Scope to develop / expand the
community
• Good for job creation
• Does too little - there is so much
potential
• Village needs more
• New school required*
• Support green loop
Delivering Current LDP Allocations
Option 2
Agree Disagree Neither
8 4 2
57% 29% 14%
Comments from the community
• More shops
• School replacement required*
• Development to have community feel
• Remove HGVs from village centre and
create spine road
• Currently no obvious village centre - should
try to create
• A community hub in addition to Speymouth
Hall
• Understand housing / employment to
deliver spine road
• No link / spine road
• Good to have wider plan for retail and
school
Supporting an Enhanced Village Centre
Option 3
Agree Disagree Neither
13 1 2
82% 6% 12%
Comments from the community
• Difficult to plan without knowing about
A96 dualling
• Too prescriptive and not community-led
• No more affordable housing, need more
private
• There needs to be a careful balance of
uses
• Improve children’s recreation
• A96 dualling would create lots of
opportunity
Maximising the Benefit of A96 Dualling
* currently there is not commitment from Moray Council to build a new school
Page 109

Page 110

MOSSTODLOCH2040 Masterplan Report
46
DRAFT
Page 110

Page 111

MOSSTODLOCH2040 Masterplan Report
47
DRAFT
Summary and Outcomes
As shown in the questionnaire responses, there was support
from the community for all options which indicates that
there is general support for growth and enhancement for
the village, however, Option 3 was chosen as the preferred
approach, indicating the desire to maximise the potential
benefit by:
• delivering a new road link from the Cowfords
Roundabout to Garmouth Road
• reducing traffic (particularly HGVs) through the centre of
the village
• forming logical development sites (potentially
employment and residential) to the west of the village
and either side of the new ‘spine road’
• enhancing green spaces /social spaces and village
• create new green spaces to support an improved green
network and ‘green loop’
It should be noted that from the responses received that
there continues to be a general split in opinion regarding
the scale of new employment and residential development
but that there is an acknowledgement that development is
required to deliver many of the aspirational changes to the
village regarding shops, services and open spaces.
Community Steering Group
Through the second engagement event the team sought
to identify members of the community that would be
interested in joining a Community Steering Group (CSG).
The CSG would be a useful conduit between the masterplan
team and the community in the short term, but in the
medium to long term could help guide a Local Place Plan for
the village.
Soft Market Testing
Informal discussions took place with a number of
housebuilders to test the market in and around Mosstodloch
and determine at what scale housing development could
take place in the short, medium and long term.
From these discussions it was clear that the local area is
attractive to house builders. Post Covid living and working
practices was identified as a factor when considering
locations such as this.
Stakeholder Engagement
Moray Council
A series of virtual and in-person meetings were held with
Moray Council departments which included:
• Planning
• Roads and Transport
• Education Resources and Communities
• Flooding
• Climate Change
Forestry and Land Scotland
A series of virtual and in-person meetings were held with
Forestry and Land Scotland (FLS) to explore the emerging
masterplan. Key points of discussion included:
• Forestry
• Access
• Minerals
Local Employers
James Jones and Sons Ltd (JJS) and Baxter’s were invited
to meet with the project team in advance of each of the
two public engagement events. Representatives from JJS
attended but not from Baxter’s.
James Jones and Sons Ltd
The team was able to discuss the emerging options and
any potential opportunities or issues relative to JJS current
operation as well as their ambitions for an expanded site to
the north of their current operation (the site in question was,
at the time, subject to a live planning application). Key points
discussed included
• the potential new ‘spine road’ that could serve JJS’
operation; and
• the opportunity for Combined Heat and Power (CHP)
that could potentially provide renewable heat energy for
a range of  end users.
Mosstodloch Services
Mosstodloch Services did not respond to an invitation to
meet and discuss the emerging masterplan.
Page 111

Page 112

MOSSTODLOCH2040 Masterplan Report
48
DRAFT
Page 112

Page 113

MOSSTODLOCH2040 Masterplan Report
49
DRAFT
05  Village Masterplan
Page 113

Page 114

MOSSTODLOCH2040 Masterplan Report
50
DRAFT
FIGURE 12: LAND USE PLAN - WITHOUT A96 DUALLING
800m / 20-minute return journey on foot
A96
B9015
Garmouth Rd
Stynie Rd
Cowfords
Roundabout
Coul Brae
Roundabout
Key
Employment (c.49.8ha)
Residential (c.21.2 ha)
Opportunity (c.2.7ha)
Village Centre / Mixed Use
Education Site
CHP (c.1.3ha)
Hydrogen Hub  (c.1ha)
Potential Solar (c.8ha / 6MW*)
Environmental Investment
JJS Application Site (c.16ha)
*electricity for 2400 - 4800 homes /
equivalent employment
*the route/junctions of the spine road are indicative and subject to detailed design.Page 114

Page 115

MOSSTODLOCH2040 Masterplan Report
51
DRAFT
Proposals within the masterplan are indicative and seek
to explore the longer term potential opportunities for the
village. At this stage they have not been market tested and,
given the timescales in question (20+ years), demand will
vary and so flexibility is required to maximise potential
environmental, social and economic benefit.
Infrastructure
Cowfords Roundabout and New ‘Spine Road’
The Cowfords roundabout could be modified to introduce
an additional arm to the north and a realigned arm to form
the new ‘spine road’ from which the old A96 (village main
street) would be connected. The alignment of the road could
be subject to change to accommodate best viable design
given the flooding and as yet unknown requirements of end
users / site requirements within the employment areas.
This road will require co-investment or shared partnership
funding and will not be funded by Crown Estate Scotland
alone. The route/junctions and phasing of the new spine
road will be subject to detailed design.
Garmouth Road (B9015)
With the new ‘spine road’ there is the potential for the
Council to restrict use of the southern section of Garmouth
Road to vehicle under a certain weight in order to prevent
HGVs movements close to the school and village centre.
Employment
A mix of employment sites will be accessible from the
Cowfords roundabout / new ‘spine road’, delivering up to
approximately 47 ha of land (which includes landscape and
drainage) with the potential for c.1.5m sqft of floorspace. Use
Class 4 (Business), Use Class 5 (General industrial), Use Class
Land Use Masterplan
Following the second round of public and stakeholder
engagement a draft Land Use Masterplan was generated
to reflect the preferred Option 3 as well as respond to the
additional comments received by the community and
stakeholders.  The draft masterplan takes further cognisance
of site opportunities and constraints in terms of flooding
and drainage, access, green network and the sympathetic /
logical location of land uses.
Two version of the masterplan are shown as Figure 12
‘without A96 dualling’ and Figure 13 ‘with A96 dualling’. The
only difference in terms in land use proposals is the potential
for a tourism / leisure site that would take advantage of the
new road junction.
A further opportunity presented by the A96 dualling would
be the significantly reduced traffic along the current A96
village by-pass. This route could accommodate active travel
routes with a potential link into the existing underpass.
Such re-purposing of this road would also help to integrate
proposed new development to the south with the existing
village. Further discussion is required with the roads
authority and Transport Scotland.
Any future proposals will need to take account of local
residential amenity, both existing and proposed, as well
as mitigate potential impacts which would be evidenced
through supporting studies such as flood risk assessment,
drainage impact assessment,  landscape and visual
assessment, archaeological evaluation, habitat assessment,
glare assessment, and contamination assessment depending
on the site and detailed proposals. Pre-application planning
advice should also be sought.
6 (Storage or distribution) Use Class 7 (Hotels and hostels).
An employment site north of Baxters, extending to c.3 ha
will provide the opportunity for the future expansion of that
business.
Residential
Two areas of residential land have been identified. The
western site (east of Cowfords roundabout) would serve a
function of contributing to a high-quality mixed use western
gateway to the settlement and could deliver approximately
120-150 new homes in the short to medium term. The
southern site (south of the current A96) would serve a
function of contributing to a high-quality mixed use southern
gateway to the settlement and could deliver approximately
250-350 new homes in the medium to long term (a detailed
masterplan will be required).
Village Centre
A key area for consideration is land at and around the
existing village centre which currently comprises the
Mosstodloch Services and three retail units. The village
centre should be the focus for retail uses within the
village and support the concept of Local Living.  There is
opportunity for short, medium and long term enhancement
/ development of the village centre, ranging from
environmental / public realm / carriageway enhancements
to more significant redevelopment if there is commitment
from the land owners / in response to the evolving function
of Mosstodloch Services relative to the potential future A96
dualling.  Opportunities must be designed to help create a
strong sense of place and identity.
05 Village Masterplan
Page 115

Page 116

MOSSTODLOCH2040 Masterplan Report
52
DRAFT
800m / 20-minute return journey on foot
FIGURE 13: LAND USE PLAN - WITH A96 DUALLING
B9015
Garmouth Rd
Stynie Rd
Cowfords
Roundabout
Coul Brae
Roundabout
Dualled A96
(proposed)
Key
Employment (c.49.8ha)
Residential (c.21.2 ha)
Opportunity (c.4.9ha)
Village Centre / Mixed Use
Education Site
CHP (c.1.3ha)
Hydrogen Hub  (c.1ha)
Potential Solar (c.8ha / 6MW*)
Tourism / Leisure (c.0.8ha)
Environmental Investment
JJS Application Site (c.16ha)
*electricity for 2400 - 4800 homes /
equivalent employment
Page 116

Page 117

MOSSTODLOCH2040 Masterplan Report
53
DRAFT
Mixed Use
A site has been identified east of The Ian Baxter Picnic
Area which could potentially accommodate a mixture
of community or village centre uses helping to link the
proposed residential development to the south and
supporting a larger village centre and a strong north-south
spine through the village.
Suitable uses could include small scale retail, cafe, small
businesses or community facilities. Uses must contribute to
strengthening the village centre and be designed to respect
the setting of the village and support the concept of Local
Living.
The site could also include accessible open space and play
facilities, however this element would need to be explored
further through additional community engagement and its
delivery and maintenance undertaken by a community
group.
Primary School / Community
The primary school will likely need substantial future
investment. The decision and planning for this will depend
on a wider assessment by the Moray Council learning estates
team and the potential needs arising from the housing land
identified as part of the masterplan process / subsequent
development plans.
Speymouth Hall has been a valuable community asset for
decades but its general usage has declined. A potentially
significant increase in village population size over the next
20+ years could see greater demand which could be
supported by investment and outreach work to provide
better leisure, learning and cultural opportunities.
Opportunity Sites
The site at Balnacoul remains as identified in the current LDP.
In the context of this masterplan, it could potentially deliver
housing or alternative uses associate with the current or
future use of the adjacent forestry land.
Environment
There are two areas of open space which would benefit
from environmental improvements / investment.
The park set around Speymouth Hall is a valuable village
resource but would benefit from increased amenity through
the improvements to play area(s),  paths and the provision
of seating, picnic areas to make the park more inclusive and
accessible to all abilities. Additionally, the park is of a scale
that a portion of land could be used to provide an alternative
location for a facility such as a skate park.
At the western a gateway to the settlement is an area of
open space that is currently scrub vegetation. This area has
significant potential to be included in the overall planning of
the new western gateway and could include amenity open
space, planting and public art.
Tree and Hedge Planting
At the village gateways as well as around / within new
development there is a significant opportunity for new
native tree planting. Scots pine together with other native
species which will support biodiversity enrichment. The use
of Scots pine or suitable alternatives  in key locations would
successfully stitch the new landscape in with the existing
setting.
Beech hedging is distinct characteristic of the village and
should be used at gateways and as a key part of landscape
strategies within future development sites.
Renewable Energy /  Net Zero
The suitability of the sites proposed for the renewable
energy proposals below will require further investigation
with particular consideration given to addressing the
potential impacts set out with relevant planning policy.
Solar
A site of approximately 10ha could accommodate a solar
array of c.8ha which could generate around 6MW of
electricity, enough to power between 2,400 and 4,800
homes.
CHP
The potential expansion of the sawmill could see the
generation of a fuel source from their processes to power
a Combined Heat and Power (CHP) plant which could
provide renewable heat energy locally as well as renewable
electricity.
Hydrogen
A 1ha site could accommodate a Hydrogen Hub that would
consist of an electrolyzer plant (production) and distribution
capabilities. The plan could generate approximately 35MW
of energy and the heat generated through the process could
be used locally. A plant such as this would require 30-35MW
of electricity to power the process and ideally this would
come from local renewable sources like solar or from a
CHP plant (fuel mix depending regarding renewable energy
credentials).
Page 117

Page 118

MOSSTODLOCH2040 Masterplan Report
54
DRAFT
Site Land Use Area (ha)
E1 Employment 10.6
E2 Employment 8.1
E3 Employment 12.3
E4 Employment 15.5
E5 Employment 3
R1 Residential 4.4
R2 Residential 16.8
ENG1 Renewable Energy 11.2
ENG2 Renewable Energy 2.5
O1 Opportunity 2.7
VC1 Village Centre 0.3
VC2 Village Centre / Mixed Use 1.4
T1 Tourism 1.5
G1 Speymouth Park 2.3
G2 Community Growing Park 1.8
G3 Village Pocket Park / Community Space 0.05
G4 Gateway Park 2.3
G5 Black Burn Park 6.5
G6 Balnacoul Wood 23.5
Land Use Schedule
• Approximately 50 ha of employment land
potentially delivering around 1.5m sqft of floorspace.
• Approximately 21 ha of residential land (gross)
potentially delivering around 400 homes in the
short, medium and long term.
Net Zero
There are a range of net zero objectives identified as
objectives for this masterplan (outlined in the Sustainability
Assessment p.20), the delivery of which will be the
responsibility of all stakeholders going forwards, with the
primary responsibility lying with those developing the
space (though supported by Crown Estate Scotland and the
Council).
James Jones and Sons Ltd
The land to the north of the existing sawmill is currently
subject to a live planning application to expand the mills
current operations. This masterplan neither supports nor
objects to the application but acknowledges that there are
a range of considerations such as the increase in traffic as a
result of the expansion but also the potential benefit in terms
of employment and the opportunity for CHP.
Tourism
With the growth of the village south of the current A96 and
with the potentially significant influence of the dualled A96
in the medium to long term, there is an opportunity for
the provision of a tourism / leisure use close to the new
Mosstodloch junction. In time this could also serve a function
for vehicle fuelling, be that hydrogen for HGV / buses and
coaches or EV charging for cars.
The timing of delivery and its relationship with other uses at
the village centre is an important consideration.  Discussion
will continue with the local roads authority and Transport
Scotland through the Local Place Plan process.
Note : Developer obligations may be sought to mitigate the impact of
their development on the community. The LDP2020 Developer Obligations
Supplementary Guidance sets out the requirements and when these may
be sought.
Page 118

Page 119

MOSSTODLOCH2040 Masterplan Report
55
DRAFT
E1
E2
E3
R1
R2
O1
G6
G5
G1
G4
G2
G3
E4
ENG1
ENG2
VC1
VC2
E5
Site Land Use Area (ha)
E1 Employment 10.6
E2 Employment 8.1
E3 Employment 12.3
E4 Employment 15.5
E5 Employment 3
R1 Residential 4.4
R2 Residential 16.8
ENG1 Renewable Energy 11.2
ENG2 Renewable Energy 2.5
O1 Opportunity 2.7
VC1 Village Centre 0.3
VC2 Village Centre / Mixed Use 1.4
T1 Tourism 1.5
G1 Speymouth Park 2.3
G2 Community Growing Park 1.8
G3 Village Pocket Park / Community Space 0.05
G4 Gateway Park 2.3
G5 Black Burn Park 6.5
G6 Balnacoul Wood 23.5
A96
B9015
Garmouth Rd
Stynie Rd
Cowfords
Roundabout
Coul Brae
Roundabout
FIGURE 14: LAND SCHEDULE PLAN
Page 119

Page 120

MOSSTODLOCH2040 Masterplan Report
56
DRAFT
FIGURE 15: ILLUSTRATIVE MASTERPLAN
A96
B9015
Garmouth Rd
Stynie Rd
Cowfords
Roundabout
Coul Brae
Roundabout
1
2
10
10
15
16
16
10
10
11
17
A
A
A
A
A
B
B
G
F
C
A
E
D
B
8
9
14 13
3
7
12
2
6
10
4
5
Key
Core Paths
Cycleways
Proposed Paths
Page 120

Page 121

MOSSTODLOCH2040 Masterplan Report
57
DRAFT
Illustrative Masterplan
The illustrative masterplan provides a
visual  summary of the outcomes from the
engagement and design process, indicating
the main land uses and key features /
interventions.
Land UsesSix Key Components Key Features / Interventions
• The new (spine) road  - completing the
principles of taking traffic away from
the village centre (initiated in 2011 with the
village bypass)
• Strengthen the village centre / heart /
space
• Development to the south, thinking
carefully on how it links and relates to
the village
• Support and expand upon the series of
paths around the village
• Test ways of making Mosstodloch a net
zero carbon place
• Working with stakeholders to invest
and build on land value that might
be generated through continued and
planned development, back into the
village
• Improved / extended path network
• Pedestrian / cycle crossing
• Active travel (cycle lane) extended
through Mosstodloch and connecting to
Fochabers
• Potential Combined Heat and Power
plant
• Potential Hydrogen Hub (production
and distribution)
• Potential pedestrian / cycle connection
under dualled A96
• Reduced traffic on current A96 provides
opportunity for active travel and positive
activation by development
• Additional bus stops to provide greater
accessibility for western expansion
• Employment Sites
• Housing Sites
• Village Centre Expansion / Mixed-Use
• Potential solar farm (c. 8MW)
• Site subject to detailed planning
application for timber yard expansion
(James Jones & Sons Ltd)
• Tourism / Gateway opportunity
including EV charging / hydrogen
refuelling
• Opportunity Site
• New Road linking Cowfords Roundabout
to Garmouth Road (B9015) serving
employment land and timber yard
• New gateway / green arrival
• School site
• Enhancements to existing village centre
• Potential to restrict use to vehicles
under a certain weight classification
• Improvements to ‘Speymouth Park’ to
improve / enhancement of paths, play
area and benches / tables
• Improvements to existing pocket park /
green space
• New linear park with community
growing and orchards and improved
existing core path
• New biodiversity park with ecological
enhancements
A
B
C
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
E
F
G
Page 121

Page 122

MOSSTODLOCH2040 Masterplan Report
58
DRAFT
FIGURE 16: GREEN NETWORK
2
7
7
1
1
1
1
6
3
5
4
4
A96
B9015
Garmouth Rd
Stynie Rd
Cowfords
Roundabout
Coul Brae
Roundabout
Black Burn
Key
Core Paths
Cycleways
Proposed Paths
Page 122

Page 123

MOSSTODLOCH2040 Masterplan Report
59
DRAFT
The Green Loops
The existing Core Path network can be extended west to
provide access in and around the proposed employment
sites.
The potential for a pedestrian / cycle crossing over the
A96 west of Cowfords roundabout would facilitate a new
southern loop that could connect through Forestry and
Land Scotland land towards the old B9015 and around
the southern housing site (Balnacoul). The A96 crossing
becomes more deliverable following the A96 dualling and
the subsequent reduction in traffic on the current A96.
Details are not currently available regarding pedestrian
and cycle routes associated with the with the A96 dualling
infrastructure i.e. north-south which would be convoluted
if via the dumbbell junction. Therefore, a pedestrian / cycle
underpass would provide direct north-south connectivity
and would allow potential recreation access to Balnacoul
Wood and the small loch on its western flank (a feature that is
currently visited on foot by walkers from Mosstodloch).
Further to the provision of additional routes, the addition
of clear and attractive signage, wayfinding and information
giving will improve the value and this network of routes. 
Village Centre Green Space
Currently, there is a small green space to the east of
Mosstodloch Services and south of Dene Place. It is an
under used space and has the potential to form part of an
enhanced village centre, be it as a community garden or
general area for congregation with some form of shelter. The
shape and form of the space could be explored further with
the community.
Community Growing and Orchard
The existing area of green space, north of Pinewood Road
and  containing a Core Path, can be expanded to form a
substantial buffer between current residential and future
employment uses. The space will also function as a key east-
west green corridor for movement and also production in
the form of community growing.
Western Gateway
Given the proposed development sites, the western
approach to Mosstodloch from Elgin will be changing. While
this will be mixed-use with focus on high-quality building
design and materials to support its gateway / arrival point
function, there is also a significant opportunity for high-
quality landscape and green space to support this further.
Significantly, the area of land east of Cowfords roundabout
and set between the old and new A96 could be enhanced to
form a gateway park with a public art feature and footpath
link into Balnacoul Wood / The Ian Baxter Picnic Area.
Landscaping associated with the redeveloped Cowfords
roundabout and the new ‘spine road’ will be provided and
should feature native species tree (Scots pine) and locally
common hedge (Beech) planting. 
Black Burn Park
A new area of parkland could be created at the centre of the
new employment sites through which the Black Burn flows.
A large portion of this area is also at risk of flooding.  The
integration of blue / green infrastructure to accommodate
SuDS beyond this zone is important. There is also an
opportunity for biodiversity net gain through ecological
enhancements which could see the creation of a high-
quality  ‘eco-park’.
Speymouth Park Improvements
The park set around Speymouth is a fantastic community
resource but its amenity value could be increased by the
provision of additional sitting in the form of both benches
and picnic tables.
Given the large size of the park, including the car parking
area, this is a potential location for a use / facility that would
be attractive to older children. The detail of this would need
to be explored further and likely delivered and maintained
by a community-led group / organisation.
Active Travel
Currently, there is a mixture of on and off road active
travel around Mosstodloch. New development proposals,
including active travel routes, must consider opportunities to
maximize safe travel routes
An additional route would be incorporated into the design
of the new ‘spine road’ linking through the new area of
employment towards the sawmill.
Biodiversity Improvements
Seek to deliver significant biodiversity net gain through
village wide opportunities.
Drainage
Through the proposed development drainage should be
carefully considered along the provision of open space.
Proposals must pro-actively and positively design SUDS
that are integrated throughout development and maximise
biodiversity and landscape enhancement.
Green Infrastructure / Network
In addition to the strategic proposals outlined all development proposals will require
to provide open space, planting, green corridors and biodiversity enhancement
within sites in line with the Local Development Plan and NPF4 policies.
31
2
6
7
4
5
Page 123

Page 124

MOSSTODLOCH2040 Masterplan Report
60
DRAFT
FIGURE 17: ILLUSTRATIVE VILLAGE VIEW
Southern
Expansion
A96
Dualling
New Homes
Solar Farm Employment 
Employment 
Village Centre
Enhancements
Page 124

Page 125

MOSSTODLOCH2040 Masterplan Report
61
DRAFT
Over-Arching Concepts
The Village Spine
The north-south spine of the village could be strengthen with
proposed development / uses that activate the streets and
support the village centre as a focal point for the community.
The following drawings are provided for illustrative purposes
and to help visualise how some of the key components of
the masterplan could be delivered. All proposals will be
subject to detailed design through a planning application
process.
Gateway Zone:
Leisure / Tourism
Residential Edge:
Activating  the street
Enhanced Village Centre
Village Centre Expansion
New Employment:
Paths, planting and frontage
New Community Parkland:
Paths and community growing
FIGURE 18: ILLUSTRATIVE ‘VILLAGE SPINE’ VIEW
Page 125

Page 126

MOSSTODLOCH2040 Masterplan Report
62
DRAFT
The Western Gateway
Proposed development, open space and landscaping
at the western point of arrival provides a significant
opportunity to establish a high-quality gateway that
celebrates the village as a great place to live and work.
The Eastern Gateway
New development should positively address the Coul Brae
roundabout while providing an attractive landscape setting with
native tree and hedge planting. The exact positioning of new
development will be subject to technical assessments such as
noise and air quality, but the principle is for high-quality new
homes and development to be visible from the roundabout but
supported by an attractive landscape framework.
New development will be carefully integrated with the
existing village and will use the proposed ‘new spine
road’ as a buffer between employment and residential
uses. In terms of landscaping, native trees (Scots pine)
and beech hedges will be used.
FIGURE 19: ILLUSTRATIVE ‘WESTERN GATEWAY’ VIEW FIGURE 20: ILLUSTRATIVE ‘EASTERN GATEWAY’ VIEW
Page 126

Page 127

MOSSTODLOCH2040 Masterplan Report
63
DRAFT
The Southern Expansion
The expansion of the village south and beyond the existing
A96 provides the opportunity to deliver a range of new
homes, green infrastructure, path networks and create a
significant new southern point of arrival to the village.
New housing at this scale, around 300 homes and delivered
in phases over the next 15 years, could support an expansion
to the village centre, improvement to services and the
expansion of community infrastructure.
A substantial proportion of the housing would likely be open
market / private housing which could play an important role
in relieving the pressure on the existing housing stock.
FIGURE 21: ILLUSTRATIVE ‘SOUTHERN EXPANSION’ VIEW
Page 127

Page 128

MOSSTODLOCH2040 Masterplan Report
64
DRAFT
Net Zero Carbon Place
Over the next 20+ years Mosstodloch has a significant
opportunity to embrace growth in a highly sustainable way
and evolving into a genuine net zero carbon place.
This ambition and way in which Mosstodloch approaches
growth and development going forwards can form the
framework to proposals and decision making and could
include:
• renewable energy production and storage
• heat networks
• highly energy efficient new homes and potential
retrofitting of existing homes
• improved / expanded  active travel networks
• improved / expanded  village centre and community
infrastructure
• mobility hub - EV charging, hydrogen refuelling, last
mile deliveries etc.
FIGURE 22: ILLUSTRATIVE ‘EMPLOYMENT / RENEWABLE ENERGY’ VIEW
Page 128

Page 129

MOSSTODLOCH2040 Masterplan Report
65
DRAFT
FIGURE 23: ILLUSTRATIVE VILLAGE VIEW
Page 129

Page 130

MOSSTODLOCH2040 Masterplan Report
66
DRAFT
Page 130

Page 131

MOSSTODLOCH2040 Masterplan Report
67
DRAFT
06  Action Plan & Timeline
Page 131

Page 132

MOSSTODLOCH2040 Masterplan Report
68
DRAFT
Timeline
The timeline below is indicative and relies upon partnership working between
landowners, Moray Council and the community, among others, and estimates the
delivery period of each component.
Masterplan Adopted as SPG
Preparation of Local Place Plan
Construction of ‘spine road’
A96 dualling
Employment - E1
Employment - E2
Employment - E3
Employment - E4
Employment - E5
Housing -R1 (c.100 homes)
Housing -R2  (c.350 homes)
Energy - ENG1
Energy - ENG2
Opportunity - O1
Village Centre - VC1*
Village Centre - VC2*
Tourism - T1
Green Space - G1
Green Space - G2
Green Space - G3
Green Space - G4
Green Space - G5
Green Space - G6
2024 2028 2035 20392026 20332030 20372025 20322029 2036 20402027 20342031 2038
FIGURE 24: TIMELINE
06 Timeline and Action Plan
* the majority of the land is privately owned and timescales could change as proposals have not been formed or developed
Page 132

Page 133

MOSSTODLOCH2040 Masterplan Report
69
DRAFT
E1
E2
E3
R1
R2
O1
G6
G5
G1
G4
G2
G3
E4
ENG1
ENG2
VC1
VC2
E5
A96
B9015
Garmouth Rd
Stynie Rd
Cowfords
Roundabout
Coul Brae
Roundabout
FIGURE 25: LAND SCHEDULE PLAN
Page 133

Page 134

MOSSTODLOCH2040 Masterplan Report
70
DRAFT
Action Plan
The two overarching documents that will guide
development and placemaking in Mosstodloch over the
next 20 years + will be the Masterplan and Local Place
Plan. Each is expected to form part of the LDP and will
be material planning considerations and will use the
identified Six Themes:
• The new (estate) road  - completing the principles of
taking traffic away from the village centre
• Strengthen the village centre / heart / space
• Development to the south, thinking carefully on how it
links and relates to the village
• Support and expand upon the series of paths around
the village
• Test ways of making Mosstodloch a net zero carbon
place
• Recycling the investment and land value that might
be generated through continued and planning
development, back into the village
Masterplan
Potential adoption of the Masterplan as Supplementary
Guidance (SG) in early to mid 2023.
The masterplan will guide land use within Mosstodloch
primarily dealing with physical development such as
housing and employment uses.
It seeks to tie in short, medium and long term
development to delivering a range of placemaking
components which will be actively driven by the
community through the Local Place Plan.
Local Place Plan
The LPP will be driven by the community / Community
Steering Group and will focus on the deliver of
placemaking objectives.
Key Features / Interventions
Key Features / Interventions
• New gateway / green arrival
• Enhancements to existing village centre
• Potential to stop up Garmouth Road to vehicles
• Opportunities to enhance the street furniture and
the recreational facilities within Speymouth Park’
and wider settlement
• Improvements to existing pocket park / green space
• New linear park with community growing and
orchards
• New biodiversity park with ecological
enhancements
• Extended path network
• Pedestrian / cycle crossing
• Active travel (cycle lane) extended through
Mosstodloch and connecting to Fochabers
• Potential pedestrian / cycle connection under
dualled A96
• Reduced traffic on current A96 provides
opportunity for active travel and positive activation
by development
• New spine road connecting Cowfords Roundabout
to Garmouth Road (B9015) serving employment land
and timber yard
• School potentially developed on existing site
• Potential Combined Heat and Power plant
• Potential Hydrogen Hub (production and
distribution)
• Potential alternative land uses such as renewable
energy and leisure / recreation
Page 134

Page 135

MOSSTODLOCH2040 Masterplan Report
71
DRAFT
Next Steps
The intention is for this master planning document to be
approved as Supplementary Guidance (SG) by Moray
Council.
It is likely that the existing allocation will be reaffirmed
through this process and the new sites formally identified in
future local plans. The SG is useful because it creates a level
of certainty that allows aspects (such as the proposed new
road) to move forward. These elements will take significant
time to plan, design and secure funding. The masterplan
should be seen as the ‘product’ of this engagement-led
process; a process that will continue.
In this regard Crown Estate Scotland has agreed to provide
some limited support to the ongoing task of preparing a
Local Place Plan. A small group of local people has been
formed on a purely voluntary basis and the local community
council has also been kept informed. The potential exists
for this group to consider and develop some of the more
site specific ideas identified in the Action Plan section and
produce an evolved document that could formally be
adopted in time as a Local Place Plan.          
Further to this, future site specific proposal will be subject
to a planning application process and detailed design to
demonstrate technical deliverability and placemaking.
A review of the design and place quality of all planning
applications will be completed through the Council’s Quality
Audit process when applications are submitted.
Page 135

Page 136

MOSSTODLOCH2040 Masterplan Report
72
DRAFT
Appendix 01
Page 136

Page 137

MOSSTODLOCH2040 Masterplan Report
73
DRAFT
FIGURE 26: WALKABLE DISTANCE FROM EXISTING PUBLIC BUS STOPS AND POTENTIAL ALTERNATIVE BUS ROUTE
Key
Core Paths
Cycleways
Proposed Paths
Existing Bus Stop
Potential New Bus Stop
Potential Alternative Bus
Route
Proposed A96
Dual Carriageway
A96
Cowfords
Roundabout
B9015
B9015
Coul Brae
Roundabout
B
B
B
B
B
BB
B
B
River Spey
400m (5-minute walking distance)
400m
(5-minute walking distance)
B
B
B
B
Note: Any potential bus route and service is
outwith the control of the masterplan
Page 137

Page 138

Page 138

Page 139

REPORT TO: PLANNING AND REGULATORY SERVICES COMMITTEE ON 13
JUNE 2024 
SUBJECT: INFORMATION REPORT: LEARNING ESTATE STRATEGY –
PROGRAMME DELIVERY UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of changes to the methodology to determine school
capacity which is likely to have an impact on the level of developer obligations
sought for education infrastructure.   
1.2 This report is submitted to Committee in terms of Section III (E) of the
Council's Scheme of Administration relating to functions of the Council under
Section 127 Town and Country Planning (Scotland) Act 1997.   
2. BACKGROUND 
2.1 A report on the Learning Estate Strategy – Programme Delivery Update was
approved by the Education, Children’s and Leisure Services (ECLS)
committee on 14 May 2024.  This set out that a change in methodology to
determine primary and secondary school capacity is being implemented by
the Council.  This is to ensure that the Council’s methodology is better aligned
with the Scottish Government’s 2014 Determining Primary School Capacity
guidance and to provide a more accurate indicator of current and future
school capacities for planning.  The report and appendices are set out in
Appendix 1. 
2.2 Whilst the principle of seeking developer obligations for education
infrastructure is not altered by revising the methodology to calculate capacities
in accord with the Scottish Government’s 2014 guidance, the impact is that
this will likely result in a differential between the new and previous planning
capacities (previously referred to as physical capacity).  In the majority of
cases the planning capacity is lower than the physical capacity which means
there is less capacity available in schools to accommodate pupils arising from
new developments, which may impact on the level of developer obligations
sought.  In some cases, this may result in a higher level of developer
obligations being sought to address the impact of the proposed development
on education infrastructure.  
Page 139

Page 140

3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Developer obligations will assist in delivering the infrastructure
necessary to support the Council’s priorities, such as developing a
sustainable economy, creating ambitious and confident young people
and safer communities.   
(b) Policy and Legal
The Scottish Government National Planning Framework 4 (NPF4) and
the Moray Local Development Plan 2020 (LDP) form the statutory
Development Plan for Moray.  Both have policies on an infrastructure
first approach and developer obligations.  Moray Council’s
Supplementary Guidance on Developer Obligations (SG) forms part of
the statutory Development Plan. 
The principle of seeking developer obligations for education
infrastructure is not altered by revising the methodology to calculate
capacities in accord with the Scottish Government’s 2014 guidance.  The
impact is that this will likely result in a differential between the new and
previous planning capacities (previously referred to as physical
capacity).  In the majority of cases the planning capacity is lower than
the previous planning capacity which means there is less capacity
available in schools to accommodate pupils arising from new
developments, and this may impact on the level of developer obligations
sought.   
(c) Financial implications
The Council may need to provide for any adverse impact on existing
infrastructure and facilities from new development should developer
obligations not cover the costs following viability appraisals or any
successful legal challenges on developer obligations/viability.   
(d) Risk Implications
There is the potential for increased viability challenges and/or appeals on
viability where the level of developer obligations rises.  As set out in the
Developer Obligations SG and on the Council’s website, developers are
encouraged to contact the Strategic Planning and Development team as
early as possible in the development process to ascertain the likely level
of developer obligations that will be sought in order that this can be
accounted for within development appraisals and reflected in the
purchase price of land.   
Where an appeal is granted in the developers favour there is a
reputational risk to the Council.   
(e) Staffing Implications
Work on developer obligations is carried out by the Strategic Planning
and Development Team, supported by officers in Education,
Page 140

Page 141

Transportation, Housing, Legal, Finance, and NHS Grampian. 
Challenges from developers result in significant staff time to enable the
Council to defend their position.   
(f) Property
The property implications arising from the ECLS report on 14 May 2024
are addressed in Appendix 1.   
(g) Equalities/Socio Economic Impact
The equalities/socio economic impacts arising from the ELCS report on
14 May 2024 are addressed in Appendix 1.   
(h) Climate Change and Biodiversity Impacts
All aspects of the Learning Estate programme will be aligned with current
and future Council policy on climate change and biodiversity.     
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), the
Acting Head of Economic Growth and Development, Strategic Planning
& Development Manager, the Head of Education, the Legal Services
Manager, the Chief Financial Officer, Committee Services and the Equal
Opportunities Officer have been consulted and the comments received
have been incorporated into the report. 
4. CONCLUSION 
4.1 The Committee is asked to note the changes to the methodology in
calculating school capacity and the potential impact this may have on
the level of developer obligations sought for education infrastructure.   
Author of Report: Eily Webster, Principal Planning Officer, Strategic Planning and
Development 
Background Papers:   
Ref: 
Page 141

Page 142

Page 142

Page 143

REPORT TO: EDUCATION, CHILDREN’S AND LEISURE SERVICES
COMMITTEE ON 14 MAY 2024 
SUBJECT: LEARNING ESTATE STRATEGY - PROGRAMME DELIVERY
UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONS DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To provide the Committee with an annual update on the status of the Learning
Estate Strategy Delivery Programme. 
1.2 This report is submitted to the Council in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as an Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) notes the annual update on the status of the Moray Learning
Estate Delivery Programme; 
(ii) notes the planned Capital budget investment to deliver the
Programme; 
(iii) approves the requirement for additional workforce resources to
deliver the programme; and 
(iv) agrees to recommend to the Corporate Committee approval of the
allocation of funding from the transformation reserve to meet the
costs of posts that require revenue budget for up to 3 years. 
3. BACKGROUND 
3.1 ‘The Learning Estate Strategy 2022 to 2032’ was approved by Moray Council
on 28 September 2022 (para 15 minute refers). The Strategy took account of
the themes within the previous ‘Developing a Strategic Approach to the
Learning Estate’, and of current and developing priorities, including the
Climate Change targets, and set out how the new Learning Estate Team
would manage investment in our Learning Estate over the next 10 years to
deliver the strategic vision for a Learning Estate “that is flexible and
Page 143

Page 144

inspirational that supports excellence and equity for all in Moray, building a
better future for our children and young people, provision of life-long learning
opportunities and provides the foundations for a growing and diverse
sustainable economy’. 
3.2 To meet these principles and determine the investment strategies in line with
the Council’s 10 year capital plan the following factors are considered: 
• Sufficiency - School Estate and Capacity Need 
• Quality - School Condition and Suitability
• Efficiency and Sustainability – Energy, Net Zero Carbon and Repair and
Maintenance
• Affordability 
The location, as well as the design of facilities, contributes to energy reduction
and achieving net zero, and local living; where people can meet the majority
of their daily needs within a reasonable distance of their home, preferably by
walking, cycling, wheeling or sustainable transport modes.  This reflects the
policies within the Scottish Government’s National Planning Framework 4
(NPF4) which aim to create sustainable communities where services are
located within a walkable catchment which promotes healthier lifestyles and
reduces the need for people to drive. 
4. STATUS 
Current Learning Estate Assessment 
4.1 Currently the Moray Learning Estate consists of: 
• 8 Secondary Schools
• 46 Primary Schools (1 currently mothballed)
• 63 Early Learning Centres – 24 are local authority managed (23 are in
within Council settings with the exception of Lady Cathcart) and 39 partner
provided (13 of these are tenants within school grounds or community
buildings - with the exception of VIP) 
Determining School Capacity - Primary Schools
4.2 An Information Report on Primary and Secondary School Capacity,
Occupancy and General Purpose Spaces for 2023/24 was submitted to the
Education, Children’s and Leisure Services (ECLS) Committee on 20
February 2024. It highlighted a change in methodology, to better align with
Scottish Government’s 2014 Determining Primary School Capacity guidance
and provide a more accurate indicator of current and future school capacities
for planning. 
4.3 Working Capacity  is now used to determine  annual  school staffing resource
need, the planning the methodology change does not impact this process.
The Planning Capacity is the trigger for Developer Obligations currently where
an intervention is required i.e. placement restrictions, rezoning, refurbishment,
extension or new build then the threshold at which money will start to be taken
from developments is currently 80% as set out within the Developer
Obligations Supplementary Guidance 2020. 
Page 144

Page 145

Determining School Capacity - Secondary Schools
4.4 The determination of Secondary School capacities follows a formula
developed across a number of Scottish local authorities and is based on
space standards, use of specific rooms and maximum class sizes.   
4.5 The calculation is more complex as: the number of pupils in each year group
changes each year; pupils make different subject choices each year; and,
each subject area requires different and specific space (eg science v social
subjects). Furthermore, it is impossible to have every classroom in a
secondary school occupied 100% of the time – and to do so would severely
restrict the curriculum. 
4.6 The formula used to determine the number of usable spaces in a secondary
school is dated and does not fully reflect the current curriculum. The Learning
Estate team is currently reviewing the formula, in collaboration with our
Northern Alliance partners, and wider Association of Directors of Education
Scotland, to better inform our secondary school capacity calculation in the
future. In addition, in order to better inform the Elgin High School extension
project we have conducted analysis of the current timetabling and teaching
space utilisation to determine future design improvements, effective space
utilisation and better ‘ways of working’. The same methodology will be
adopted for future secondary school new builds and refurbishments. 
Determining School Capacity – Additional Support Needs
4.7 Additional Support Needs (ASN) provision is provided within mainstream
schools. Capacity for ASN provision is not currently detailed within Moray
schools capacity reporting. There is no national guidance on how to calculate
this; however, there are Scottish Negotiating Committee for Teachers (SNCT)
recommendations on the number of children and young people in a class
outlined in Annex 2.9 of the SNCT Handbook and is dependent on specific
needs. The Learning Estate team are working with the ASN Team to
determine the actual capacities of each school and to formalise assumptions
and/or develop a formula for forecasting future requirements that could
influence future school working capacities. 
4.8 The Programme is cognisant that there has been a recent increase in
numbers of children and young people that require some level of ASN support
and this increase is anticipated to continue in the future. This need is already
evidenced at Elgin High School, where the re-purposing of mainstream space
to support ASN reduced the overall mainstream capacity of the school and
necessitated a requirement for temporary modular accommodation and
accelerated the need for a permanent capacity extension at the school. 
4.9 The Learning Estate asset management and capital investment planning
remain cognisant of the developing infrastructure requirements for ASN
education support and are working with both Education and Property
colleagues to determine these requirements that will align with the maturing
Moray ASN Strategy. 
School Roll Forecasts
4.10 The December 2023 School Census reports the planning capacity for the
primary school estate is now 9913. There are 6677 primary children (in 2021
this was 6889) and therefore, in theory, 3236 surplus places. This gives an
Page 145

Page 146

average occupancy of 67.4% (68% in 2021). The primary school roll is
forecast to further decrease to 6591 by 2031. This is not consistent across the
8 Associated School Groups (ASG) with some areas forecasting an increase
in primary school children, by nearly 14% (Elgin HS ASG) and others have a
declining primary school roll of 10% (Lossiemouth ASG), over the next 6
years. Other factors will impact on the overall surplus that can be incorporated
into future operational planning including increasing ASN space provision and
utilisation. 
4.11 The same Census reports the planning capacity for the secondary school
estate is now 6724. There are currently 5458 young people in secondary
schools (5328 in 2021) and therefore in theory there are 1266 surplus spaces
(1400 in 2021). This gives an average occupancy of 81.2% (79% in 2021).
Again, there are differences across the 8 ASGs from a forecast increase of
over 11% (Elgin HS) to small decreases of between 4% (Elgin Academy) and
less than 2% (Lossiemouth HS, Milnes HS, and Speyside HS) over the next 6
years.       
4.12 It is inevitable that there will be variations in capacity across the Learning
Estate. However, pupil intake from catchment areas, placing requests (from
out of catchment), proposals for new housing and local birth rates all have an
impact, and this varies between the 8 ASGs in Moray. The Learning Estate
team continue to review and analyse the school roll forecast every 6 months
to identify any areas of concern – in terms of both increasing and decreasing
future demands.  This information will inform the development of any
necessary future intervention actions for consideration by Committee.   
4.13 Birth rates have declined (11%) over the last 4 years from a high of 825
registered births in 2018 to 736 in 2023.   
4.14 The building output rate across Moray did decline during and after the COVID
pandemic. Although the future forecast appears to show a recovery to pre-
pandemic levels it is uncertain given a number of factors that will influence it
including: the cost of construction; availability of skilled labour, both locally
and nationally; and the increases and current uncertainty with residential
mortgage rates and therefore housing demand. 
4.15 The Learning Estate team, working with Planning (and local developers), will
continue to regularly review the build out rate across a number of major
housing developments in Elgin, Buckie and Forres and undertake sensitivity
analysis and scenario planning to ascertain any changes and impacts on
school rolls. 
4.16 There are currently 9 primary schools in Moray operating with capacities
below 50% planning capacity and forecasts indicate this number will rise to 11
schools over the next 5 years with a further 2 schools just above 50% (29% of
all primary schools). 
4.17 A key factor in managing current and future school roll capacity is out of
catchment placing requests. 
4.18 In Moray, 30% of primary school and 10% of secondary school pupils attend a
school outwith of their catchment area. At the individual school level, 12
Page 146

Page 147

primary schools have between 30-50% of pupils from out of catchment and 4
schools have over 50% with one of these school operating with 74% of
children from out of catchment. Detail on out of catchment numbers is set out
on a school-by-school basis is at Appendix 1. 
Building Condition
4.19 Building condition is concerned with the current state of the fabric of the
school and with safety and security. Condition has a direct impact on what
goes on in the school. Schools in good condition – irrespective of age or
design – signal to all users (pupils, teachers, staff and community) that
learning is a values activity, that the learning environment is a priority and
often gives that all important ‘feel good’ factor. 
4.20 The Property Asset Management team is currently engaged in completing
Core Condition surveys for all schools. The surveys commenced in early 2022
and are planned to complete by February 2025. They are undertaken in line
with the Scottish Government Condition Core Fact assessment methodology
which considers a range of components and elements from the structural
frame, mechanical and electrical equipment, through to the décor. Each
component is consider separately and an overall rating is determined that
range from: 
A: Good  Performing well and operating efficiently
B: Satisfactory Performing adequately but showing minor deterioration
C: Poor  Showing major defects and/or not operating adequately
D: Bad  Economic life expired and/or risk failure 
A summary of overall Condition ratings for schools in Moray is set out in the
table below.   
No of
Schools
A 
Condition
B 
Condition
C 
Condition
D 
Condition
53* 5 16 30 2
* 11 school surveys that that are 9 years or older 
4.21 A more detailed breakdown of the current school conditions is set out in
Appendix 2. 
4.22 The Condition rating is a key factor in determining and directing forward
improvement works planning and informing prudent and timely decisions on
ongoing maintenance to enable delivery and sustainment of the quality and
asset value of school buildings over the long term. For the past 10 years, the
council has followed a “make do and mend” approach.  However, over the last
12 months there has been a commitment for capital funding for school
condition improvement.  In order to address improvement across the whole
Learning Estate this has been at the determined minimum level of annual
investment (index linked) that is required for at least the next 15 years.  Spend
will be focused on the areas of highest need (with major fabric and component
renewal focus together with health and safety and other statutory building
requirements a priority) taking account of the sustainability of investment,
complimenting any investment within the capital programme and general
maintenance costs. 
Page 147

Page 148

Building Suitability
4.23 Suitability assesses the usability of the school building and how the internal
space and layout of the building helps support learning and teaching. 
4.24 The assessment of Suitability covers a wide range of aspects in relation to
learning and teaching, community use and health promotion. It takes into
account the following physical issues: 
• Internal environment (temperature, ventilation, lighting, finish, cleanliness
etc.);
• The size, flexibility, accessibility and number of different types of
accommodation;
• Location of spaces; and
• Fittings and fixed furniture.
4.25 Suitability assessment are undertaken in line with the Scottish Government
Suitability Core Facts guidance that assesses each school against an A to D
category, with: 
A: Performing well and operating efficiently;
B: Performing well but with minor problems;
C: Showing major problems and/or not operating optimally; and
D: Does not support the delivery of services to children and communities 
A summary of Moray schools is set out in the table below. 
No of
Schools
A 
Suitability
B 
Suitability
C 
Suitability
D 
Suitability
53* 39 14 0 0
* Majority of current assessments completed in 2019/20 so due reassessment over next 2
years. 
4.26 There has been an improvement in the suitability over the last few years as
there has been a focus of capital investment around the accessibility and the
safety and security aspect of schools. Investment in further improvement and
maintenance is a key focus for the future delivery programme.     
4.27 A more detailed breakdown of the current school suitability assessments is set
out in Appendix 3. 
Affordability
4.28 A report to Moray Council on 24 January 2024 on the 2024-25 Capital Plan
(para 11 of minute refers) noted a £40m capital budget requirement for
financial year 24/25 and an overall 10 year capital investment in the Learning
Estate of £383m to deliver new build projects, BB Condition/Suitability
upgrade and refurbishment and repair and maintenance projects. Further
significant capital investment in the BB Condition/Suitability upgrade projects
would be required for a further 5 years (out to 2039). A breakdown of these
capital costs is at Appendix 4. 
4.29 The report stated that the prime cost driver for the Capital Plan is asset
management and so the focus for reviewing the 10 year plan was asset
management based.  The potential areas of focus were identified as:
Page 148

Page 149

• Reduce the asset base
• Reduce the asset standard
• Lengthen the period over which capital is spent (effectively increasing the
asset life) 
4.30 In applying that focus to the Learning Estate the asset standard (condition and
suitability) for schools is mandated as a B (satisfactory) minimum. In addition,
if there is a reduction in planned upgrade works there is a risk the assets will
continue to deteriorate and the risk likelihood of building failure will increase.
The realistic options for the Learning Estate is therefore to reduce assets or
lengthen programmes of work. The BB upgrade programme plan has now
been extended from 10 to 15 years. 
4.31 The 24 January 2024 Council report concluded the need to cap capital
expenditure to contain the cost of borrowing within the agreed limit of
affordability.   A report on how the cap might operate will be brought to a
future meeting of the Council.  However, as the most significant element of the
indicative 10 year plan is the Learning Estate the cap is likely to be brought
most heavily to bear on planned investment in the Learning Estate and that
without significant levels of Scottish Government funding the Council is
unlikely to be able to achieve its aspirations. 
Status - Conclusion
4.32 The overall status of the Moray Learning Estate is one of that reflects change
and decline. Recent year-on-year falls in birth rates and minimal population
growth leads to a forecast future reduction in a significant number of primary
school rolls and under-utilisation of buildings. In a small number of schools
there is a risk of short and longer term capacity issues that need to be fully
assessed and mitigated. Capacity planning across Moray is further
exacerbated by the significant number (17%) of primary school pupils on the
school roll of out of catchment schools at parental request.  A majority of
these same schools are currently operating below the minimum condition
standard required and need significant financial investment to upgrade and
maintain, through informed and planned preventative asset management,
and, in some cases, replacement of buildings and equipment, in order  to
avoid serious building failure and compromise education continuity. There is a
requirement to review and rationalise the current learning estate, seeking
options to ensure greater utilisation of school buildings and prioritise
investment to achieve maximum and timely benefit and ensure that the future
learning estate is affordable and sustainable - including meeting net zero
commitments. 
4.33 To be successfully accepted, any proposed future changes to deliver the
future learning estate will require ongoing engagement and statutory
consultation with stakeholders.   
5. STRATEGY DELIVERY PROGRAMME 
Strategy Update/Assessment 
5.1 The requirement for the establishment of a Learning Estate Delivery
Programme was in response to the approval of the ‘Developing a Strategic
Page 149

Page 150

Approach to the Learning Estate’ by Council on 16 December 2020 (para 5 of
minute refers) and a number of key steps and actions detailed therein. A
number of which have already been implemented or are address within in-
progress projects or activities. 
5.2 The adoption of a programme approach assigns accountability and
responsibility to the delivery of the aims and objectives of the strategy and
supports a robust governance framework to monitor progress against these
and time and cost to ensure that at completion of the programme that Moray
has a sustainable learning estate that is fit for purpose, sustainable and
affordable. 
5.3 The programme has a defined themes framework for a range of projects and
supporting activities of work delivered individually and collectively to ensure
an alignment of effort and to reduce the likelihood of duplication.  The key
programme themes are: 
• New Build and Major Refurbishment
• Asset Management
• Net Zero Carbon Intervention
• Estate Rationalisation
• Engagement and Consultation
• Estate Transformation 
Progress Updates 
New Build and Major Refurbishment
5.4 A major capital cost to the Learning Estate Programme over the next 10-15
years will be associated with new build or major refurbishment projects to
meet the future primary and secondary capacity requirements or to replace
and/or refurbish an entire school or component buildings as that asset has
reached or is close to life expired. 
5.5 A number of new build projects are in various stages of design and
development and a number of other new build and/or significant refurbishment
projects will need to be considered over the next 10 years. These are: 
Capital Project Planned/Earliest
Operational Date
Status
Elgin Academy
Capacity Extension
Aug 2026 Detailed design phase
Future Forres
Academy
Jan 2028 Design Brief/Site
Selection
Future Buckie High
School
Aug 2029 Design Brief
Findrassie PS Aug 2029 Concept design (Paused)
Elgin South Primary
Capacity Expansion
(Glassgreen PS)
Aug 2028 Options appraisal 
Page 150

Page 151

5.6 The current estimate of capital required to deliver these projects is £259m.
The Elgin High School Capacity Extension and the Future Forres Academy
projects will receive financial support from Scottish Government under the
Learning Estate Investment Programme (LEIP). It is estimated this could
contribute up to £50m of funding although it should be noted this would be
provided via a Revenue Based Funding Model over the first 25 years of the
operational life of the new buildings rather than an upfront capital contribution. 
Asset Management
5.7 As noted earlier in this report 32 out of the 53 schools in the Moray Learning
Estate have been assessed as poor (C) or bad (D) Condition – an increase of
2 schools from previous years reporting. The Learning Estate Asset
Management Group has been established to develop and manage a long-
term condition and suitability upgrade programme of works that will take up to
15 years to deliver. It is also seeking to develop a long-term asset
management plans for every school that will consider a planned preventative
maintenance approach.     
5.8 A priority list for condition upgrade works has been created based on an
assumption of a £5m budget for financial year 2024/25 and year-on-year
annual capital investment of £10m from financial year 2025/26 onwards and
for at least the next 15 years. This investment will focus on building
refurbishment and component replacement, together with any statutory
requirement standards, and detailed works planning is in progress. It is
estimated that the capital investment required to upgrade and maintain the
school estate over the next 15 years could be as high as £190m.     
5.9 Planned BB upgrade works for this year includes: 
• Keith Grammar – Upgraded fire alarm system 
• East End Primary School – Replacement Windows and External Doors
and External Wall Insulation 
• Milnes High School - Windows and lighting replacement and roof
upgrade 
• Speyside High School - Windows and door replacement 
• Forres Academy - Toilet upgrades 
• East End Primary School, Millbank Primary School, Seafield Primary
School and Aberlour Primary School  - Drainage improvements
• Bishopmill Primary School - sports hall floor replacement
• Greenwards Primary School – air quality/ventilation improvements
• Cullen Primary School B upgrade refurbishment (Phase 1 - design)
• Mortlach Primary School (Phase 1 – design) 
Final costings for each of the projects and affordability this year is still be
determined. Any surplus will be allocated to BB upgrade design works to
support 2025/26 and 2026/27 works planning. 
Net Zero Carbon
5.10 The Learning Estate is acknowledged as a major contributor of carbon
through inefficient energy buildings and use of fossil fuel heating sources. The
programme is committed to meeting the Council targets for next zero through
the adoption of a ‘fabric-first’ approach together with a phased replacement of
Page 151

Page 152

fossil fuel heating sources. The location of facilities also plays an important
role in reducing or increasing carbon emissions. 
5.11 In order to understand the ‘fabric-first’ requirements 5 primary schools (Cullen,
Kinloss, Pilmuir, West End and Burghead) have been selected as building
architypes. This is a proof of concept cost benefit assessment of net zero
invention opportunities. The technical approach adopted to do this is informed
Enerphit retrofit analysis which has been successfully used by other local
authorities in Scotland to benchmark their assets, including schools, for net
zero carbon interventions. 
5.12 Enerphit is a defined standard of thermal comfort, energy efficiency and
climate protection that can be adopted and retrofitted to current infrastructure
with specific reference to fabric, heating and ventilation refurbishment that
would delivery net zero building performance. The analysis undertaken will
provide a detailed assessment of the cost and performance value of various
intervention strategies that can be evidenced to support future investment
decisions. 
5.13 No specific budget has been provided to support net zero intervention project;
but it could add an additional £20m or more to the school condition upgrade
programme. The challenge is to combine both upgrade design with net zero
intervention strategies to achieve maximum benefit of capital investment e.g.
upgrade/replacement roofing works is synchronised with roof insulation works.
The Property Asset Management team is also exploring opportunities to bid
into future funding schemes that support public sector building energy
efficiency improvements. 
5.14 Cullen Primary School is a pilot project to combine B condition upgrade and
Enerphit retrofit building efficiency works. A detailed analysis report is
expected in April to support detail design and planning in financial year
2024/25 and refurbishment works in financial year 2025/26. The project also
bid for Scottish Government 2024/25 SALIX funding to support the energy
efficiency elements of the upgrade. Although the Council’s detailed application
was not successful at this time the option was given to convert to a concept
application. This has been done and the application has been successful. This
means that funding has been reserved for the project however the funding is
conditional on the submission of an updated detailed application and a full
technical assessment of the revised application which will be submitted before
the deadline of 19 May 2024. 
Estate Rationalisation and Engagement
5.15 The Learning Estate rationalisation project seeks to determine what form a
future sustainable and affordable learning estate will take. It takes account of
the factors discussed earlier in this report such future school rolls, capacity
and need, building utilisation, condition, suitability, efficiency and affordability.
This determination of the future learning estate will be undertaken in
collaboration with all stakeholders to support the development of options for
recommendation to elected members for consideration and approval. This
could see options to repurpose spare capacity in schools, rezoning to better
utilise capacity across ASGs, mothballing of schools that are not able to
deliver equitable education benefit and school mergers or any combination of
those. School closures options cannot be ruled out but are a considered a
Page 152

Page 153

final option if all other options to deliver a sustainable and affordable school
are not viable.         
5.16 The Learning Estate team are currently engaged in an extensive stakeholder
engagement exercise across the 8 ASG to support the collaborative
development of future options. This takes the form of briefings, online surveys,
drop-in community information sessions and stakeholder focus groups
together with the sharing of all detailed data and information relevant to the
learning estate. Forres ASG and Buckie ASG engagements are currently in
progress and the details of future engagement activity dates is set out below.   
5.17 Options and recommendations will be reported to Elected Members at various
stages over the next 18 months for review and approval of next step options. 
Consultations
5.18 Some proposed future changes (e.g. rezoning, merging and closure) to the
Learning Estate would require formal consultation in accordance with the
Schools (Consultation)(Scotland) Act 2010. Although the Council will be
responsible for approving the final recommendation for change the final
decision with Scottish Government Ministers who need to be convinced of the
education benefits of change. 
5.19 Anticipated formal consultations expected take place over the next 12-18
months, dependent on resource available to support, are: 
• Future of Crossroad Primary School
• Rezoning of Cluny Primary School and Millbank Primary School
• Future Forres Academy change of location
Page 153

Page 154

5.20 Any additional formal consultations will be dependent on proposed outcomes
of the ongoing ASG engagements on estate rationalisation.     
Estate Transformation
5.21 With the current and expected future under-utilisation of some areas of the
Learning Estate there is an onus on the programme to ensure the best use of
the existing assets and to review opportunities for shared use and multi-
tenancy models in the future that could provide revenue savings or income
generation and offset the cost of ownership of the learning estate assets.     
5.22 Due to resourcing constraints, this programme theme has not been
progressed beyond initial meetings with other Council services and partner
organisations. With proposed additional resource there would be a renewed
focus and effort over the next 12 months in this area in order to inform any
future new build and refurbishment activity so that it considers the creation of
adaptable and flexible spaces within some schools together with delivery of
shared access security models. 
5.23 Initial engagement will target the other Council Services, Community Planning
Partnership and Blue light services – some of whom have previously
expressed some interest in shared use of school buildings.   
Programme Progress Status 
5.24 The Learning Estate programme delivery themes are linked dependent on a
detailed understanding of a number of key factors that will impact investment
decisions and their priority. These factors are capacity, condition and
suitability. It has already been noted that the Moray Learning Estate
programme environment is one  that reflects change and decline both of
which need to be managed. 
5.25 The current new build capital investments, the extension at Elgin High School
and a new build Forres Academy, reflect interventions to address capacity
need and failing building condition respectively. These major investments by
the Council  are financially supported by up to 50% of the construction costs
as part of the Scottish Government’s Learning Estate Investment Programme.
This funding is outcome-based funding over 25 years and the Council will
meet the full initial capital cost. 
5.26 Future new build capital investments requirements include Future Buckie High
School and potential new build primary schools in Elgin (Glassgreen and
Findrassie), and these would also address capacity need and failing school
building.  However in light of affordability challenges the future design and
options for delivery need to be fully justified and evidenced. 
5.27 The poor condition of the majority of existing schools reflects the low
investment in asset management over many years. The ongoing condition
survey activity is providing detailed information to support the development of
short, medium and long term asset management plans and these surveys will
be complete in early 2025. A number of schools have been prioritised for
condition upgrade work for 2024/25 and 2025/26 and further asset
management plans will be developed over the next 12-24 months to facilitate
Page 154

Page 155

upgrade and maintenance planning over the next 5-10 years. However,
progress in this area assumes the support provided by the appointment of a
dedicated learning estate asset manager. 
5.28 The cost of ownership of the current learning estate is significant. The in-
progress ASG level engagement with all learning estate stakeholders is
informing the estate rationalisation task and options development process and
although some early options may be presented to councillors for consideration
some will take longer to develop. As part of this, the promotion and adoption
of shared use assets are  an option to address under-utilisation of the estate.
With support from other services and partner agencies opportunities for share
used will be jointly investigated over the next 6 months.         
6. PROGRAMME STAFF RESOURCING 
6.1 The initial staffing plan for the Learning Estate team only considered the
development of the strategy not the actual capacity to delivery it. The current
team configuration is unable to deliver all aspects of the strategy as the
programme develops for implementation of multiple projects. Without
additional staff resource a number of programme activities will be delayed or
deferred – with the risk of incurring ongoing Learning Estate costs elsewhere.
The table below indicates the current team resource and proposed additional
resource. 
6.2 The Community Resource Officer (0.4xFTE) is already budgeted from within
the Learning Estate staffing resource budget and recruitment is in progress.
The Project Support Officer role will be fulfilled by the reallocation of current
resources from the corporate Project Management Office which can be
accommodated as a result of the conclusion of a number of projects.  This
Page 155

Page 156

may require to be reviewed in future should there be an expansion of the
corporate transformation work but would be considered at the appropriate
time. These posts, together with the additional  0.5FTE Education Support
Officer will facilitate the existing learning estate rationalisation projects –
including future options appraisals and the associated statutory consultation
processes associated with Crossroads future, possible rezoning within Buckie
ASG and potential rezoning of Elgin HS primary school catchment. 
It is proposed that the 0.5 ESO post is funded from the Transformation
Reserve for a temporary period of up to 3 years. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report supports the LOIP outcomes of building a better future for
children and young people in Moray and growing a diverse and
sustainable economy. Together with the aims of the Corporate Plan to
review and transform the learning environment. 
(b) Policy and Legal
The Schools (Consultation) (Scotland) Act 2010 sets out the legal
requirements for consultation on relevant proposals that will result in
major change to schools.  Any engagement and consultation activity
focussing on options within ASGs and for individual schools will follow
the legal requirements as set out in this Act. 
The principle of seeking developer obligations for education
infrastructure is not altered by revising the methodology to calculate
capacities in accord with the Scottish Government’s 2014 guidance.  The
impact is that this will likely result in a differential between the planning
capacity and the current physical capacity. In the majority of cases the
planning capacity is lower than the physical capacity which means there
is less capacity available in schools to accommodate pupils arising from
new developments, and this may impact on the level of developer
obligations sought.   
(c) Financial implications 
Capital
The Council at its meeting on 24 January 2024 noted the need to cap
capital expenditure to contain the cost of borrowing within the agreed
limit of affordability.   A report on how the cap might operate will be
brought to a future meeting of the Council.  However, as the most
significant element of the indicative 10 year plan is the Learning Estate
the cap is likely to be brought most heavily to bear on planned
investment in the Learning Estate and the report on 24 January noted
that without significant levels of Scottish Government funding the Council
is unlikely to be able to achieve its aspirations for the Learning Estate. 
Revenue
When the Council approved the budget for 2024/25 on 28 February 2024
(paragraph 7 of the Minute refers) it balanced only by using reserves.
Page 156

Page 157

The indicative 3 year budget shows a likely requirement to continue to
make savings in the order of £13 million in the next two years. All
financial decisions must be made in this context and only essential
additional expenditure should be agreed in the course of the year. In
making this determination the committee should consider whether the
financial risk to the Council of incurring additional expenditure outweighs
the risk to the Council of not incurring that expenditure, as set out in the
risk section below and whether a decision on funding could reasonably
be deferred until the budget for future years is approved. 
As the budget has been balanced using reserves and reduced free
general reserves to the policy minimum, this would use further
earmarked reserves of approximately £40,000 in 2024/25 and increase
savings required in 2025/26 if approved. 
The proposed increase in Learning Estate staffing resource would cost a
minimum £266,125. This is broken down into estimated capital cost (that
can be accommodated within specific project budgets) of £198,208/year
and an estimated minimum revenue cost of £67,917. A breakdown of
these costs is set out in the table below. The table in Para 7.2 identifies
permanent or temporary status for these expanded Learning Estate team
roles. 
Role Grade FTE Annual
Cost
Revenue/Capital
Asset
Manager 
11 1.0 £75,920 Capital
Project
Manager
11 1.0 £75,920 Capital
Education
Support
Officer
ESO 3 0.5 £ 37,175 Revenue
Dep Head
Teacher
Point
8
Scale
0.5 £46,368 Capital 
The 0.4FTE community support officer is already funded through
Learning Estate staffing budget although the post has not yet been
established and the Project Support Officer is met from existing
resources. 
It is proposed that the funding for the Education Support Officer is taken
from the Transformation Reserve, subject to approval from the Corporate
Committee.   
(d) Risk Implications
The following risks are already identified and should be noted: 
• Project indicative costs take account of current market uncertainty
and inflationary forecast.  There is a risk of continuing market
uncertainty through the life of the programme, with a consequential
Page 157

Page 158

impact on costs. With the programme duration extended to 15 years
there is an increased risk of future market uncertainty. 
• The affordability risk has been identified within the Finance
implications. 
• The programme anticipates and is planning for change. The
majority of change within the Learning Estate will need to be
undertaken in accordance with the 2010 Statutory Guidance. There
is a risk of local stakeholder challenge, non-agreement to change
by elected members and Scottish ministers overturning a Council
recommendation. To mitigate this risk, consistent and persistent
robust stakeholder communication and engagement is key to
ensure all parties are aware and supportive of the benefits of
change.   
• Changes to current proposals for new schools, extensions or
rezoning as a result of changing school roll forecasts may result in
developer obligations having to be paid back to developers. 
• Changes to current proposals may result in the inability to deliver on
NPF4 policies in regard to local living, placemaking, health and
well-being and the transition to net zero.   
(e) Staffing Implications
Increased staffing proposals are set out in the body of the report. 
(f) Property
The property implications are set out in the body of the report. 
(g) Equalities/Socio Economic Impact
The quality of the learning environment can impact on learning and
attainment by as much as 16%.  The condition and suitability of our
learning estate, and capacity challenges associated with both growth
and population decline in some areas, give rise to unequal opportunity
across Moray. 
The Learning Estate Strategy requirement is that all school buildings
meet minimum standards and are fit for purpose. 
Any future change to the Learning Estate that would come under the
2010 Statutory Guidance will be required to have completed an
Integrated Impact Assessment. 
(h) Climate Change and Biodiversity Impacts
All aspects of the Learning Estate programme will be aligned with current
and future Council policy on climate change and biodiversity.     
(i) Consultations
Head of Governance, Strategy and Performance,  Chief Financial
Officer, Head of Education (Chief Education Officer), Head of Housing
and Property, Head of Economic Growth and Development, Legal
Services Manager, Equal Opportunities Officer and Caroline O’Connor,
Page 158

Page 159

Committee Services Officer have been consulted and the comments
received have been incorporated into the report. 
8. CONCLUSION 
8.1 The Committee is asked to note the current status of the Moray Learning
Estate and the ongoing programme to deliver a sustainable and
affordable school estate that meets the educational needs of the future.
A significant capital investment spread over at least 15 years is required
to support the programme and the detailed investment is qualified and
quantified for review. Finally, to assist in the effective and efficient
delivery of the projects within the strategic programme the Committee is
asked to agree the request for additional staff resources for the Learning
Estate Team. 
Authors of Report: Andy Hall, Programme Manager (Learning Estate) 
Background Papers:  Information Report to ECLS Committee on 20 February
2024: Primary and Secondary School Capacity,
Occupancy and General Purpose Spaces 2023/24 
Ref: 
Page 159

Page 160

Page 160

Page 161

School
Catchment
%
%
Aberlour
105
79
75%
26
25%
Alves
77
24
31%
53
69%
Anderson's 
259
77
30%
182
70%
Applegrove 
278
99
36%
179
64%
Bishopmill 
381
304
80%
77
20%
Botriphnie 
18
16
89%
2
11%
Burghead 
107
100
93%
7
7%
Cluny 
318
253
80%
65
20%
Craigellachie 
46
28
61%
18
39%
Cullen 
102
90
88%
12
12%
Dallas 
30
21
70%
9
30%
Dyke 
72
47
65%
25
35%
East End 
175
112
64%
63
36%
Findochty 
58
54
93%
4
7%
Glenlivet 
16
16
100%
0
0%
Greenwards 
326
277
85%
49
15%
Hopeman 
141
120
85%
21
15%
Hythehill 
287
207
72%
80
28%
Keith 
325
281
86%
44
14%
Kinloss 
221
199
90%
22
10%
Knockando 
44
30
68%
14
32%
Lhanbryde 
156
144
92%
12
8%
Linkwood 
295
170
58%
125
42%
Logie 
42
11
26%
31
74%
Millbank 
212
145
68%
67
32%
Milne's 
196
151
77%
45
23%
Mortlach 
125
120
96%
5
4%
Mosstodloch 
179
150
84%
29
16%
Mosstowie 
56
28
50%
28
50%
Appendix 1 - Primary School In-Out Catchment
2023/24 (Census 2023)
School
Roll
In catchment
Outside catchment
Page 161

Page 162

School
Catchment
%
%
2023/24 (Census 2023)
School
Roll
In catchment
Outside catchment
New
Elgin 
364
198
54%
166
46%
Newmill 
67
46
69%
21
31%
Pilmuir 
124
108
87%
16
13%
Portessie 
121
88
73%
33
27%
Portgordon 
43
33
77%
10
23%
Portknockie 
67
62
93%
5
7%
Rothes 
80
72
90%
8
10%
Rothiemay 
55
41
75%
14
25%
Seafield 
358
232
65%
126
35%
St Gerardine 
300
158
53%
142
47%
Tomintoul 
29
27
93%
2
7%
West End 
185
119
64%
66
36%
St Peter's 
102
St Sylvester's 
95
St Thomas 
38
Moray Roll
6675
Less RC pupils
235
Totals
6440
4537
70%
1903
30%
Page 162

Page 163

Appendix 2 - School Condition
Name ASG Report Date
Roofs
Floors &
Stairs 
Ceilings 
Ext. Walls, Windows
&
Doors 
Int. Walls &
Doors 
Sanitary Services 
Mechanical 
Electrical 
Decoration 
Fixed Int. Facilities,
Furniture &
Fitting 
External Areas 
Outdoor Sports
Facilities &
Permanent
Overall Score
Condition Category
15% 7% 1% 20% 7% 5% 14% 11% 2% 5% 10% 3%
Buckie High School Buckie Oct-21 D D C C C D C C C B C B 45.25      C
Cluny Primary School Buckie Apr-22 C C B C C B B A C B D B 60.00      C
Cullen Primary School Buckie Jun-22 C C C D B C D C C C D B 41.50      C
Findochty Primary School Buckie Jul-22 C C B C B B C B C B C C 57.25      C
Millbank Primary School Buckie Jul-22 C C B B B B B B C B C B 66.50      B
Portessie Primary School Buckie Aug-22 C C B C C B C B C B C B 56.25      C
Portgordon Primary School Buckie Sep-22 C C C C C B D C C B C NA 48.97      C
Portknockie Primary School Buckie Oct-22 B C C B C B C C C C C B 60.75      B
St Peters Primary School Buckie Dec-22 C B C C C B D C C B B NA 53.35      C
Bishopmill Primary School Elgin Ac Aug-23 C B C C C C C C C D C C 50.50      C
East End Primary School Elgin Ac Apr-23 C C B C B C B B C B D B 57.75      C
Elgin Academy (PPP) Elgin Ac Apr-12 A A A A A A A A A A A A 100.00   A
Seafield Primary School Elgin Ac May-23 B B B B C B A A B B C B 77.00      B
St Sylvesters Primary School Elgin Ac Jun-23 B C B C B B C D C C D B 52.50      C
West End Primary School Elgin Ac Jul-23 C C B C C C C B C C C B 53.75      C
Elgin High School (DBFM) Elgin High Aug-17 A A A A A A A A A A A A 100.00   A
Greenwards Primary School Elgin High Nov-22 C B B B B B C B C B C C 64.00      B
Linkwood Primary School Elgin High Jan-21 A A A A A A A A A A A A 100.00   A
Mosstowie Primary School Elgin High Apr-23 C B B B B B D C D B B B 60.50      B
New Elgin Primary School Elgin High Jan-23 C B C C B B B B C C C B 61.75      B
Andersons Primary School Forres Feb-22 B B B B B C B B B B B B 73.75      B
Applegrove Primary School Forres Feb-22 C B B B C B A A B B C C 72.50      B
Dyke Primary School Forres Oct-21 C C C D C A D C B B C B 46.50      C
Forres Academy Forres Oct-21 D D D D D D B C C C C C 39.75      D
Kinloss Primary School Forres Mar-22 C C B B B C C C C B D B 56.50      C
Logie Primary School Forres Oct-21 D C B C B C C C D B C B 49.75      C
Pilmuir Primary School Forres Mar-22 C C B C B B B B C C B B 62.75      B
Alves Primary School Forres May-22 D D C D C B C C C B D C 39.50      D
Dallas Primary School Forres May-22 C C B B B B B C C B C B 63.75      B
Botriphnie Primary School Keith Aug-23 C C B C B B C C C B C NA 54.64      C
Crossroads Primary School Keith Oct-22 D C C D C C C C C C C NA 40.98      C
Keith Grammar School Keith Jan-24 C C B C B B B B C C C B 60.25      B
Keith Primary School (PPP) Keith Jan-12 A A A A A A A A A A A NA 100.00   A
Newmill Primary School Keith Sep-23 B B C B B B C C C C C B 64.25      B
Rothiemay Primary School Keith Sep-23 C B B C C B C C C C C B 54.00      C
St Thomas Primary School Keith Jan-24 D B B C B C C C C B C NA 51.29      C
Burghead Primary School & Public LLossiemouth May-23 C C B C C C C C C C B NA 52.84      C
Hopeman Primary School Lossiemouth Jan-14 B B B B B B C A B B B B 74.25      B
Hythehill Primary School Lossiemouth Jan-14 C C C C B C C C C C B B 55.00      C
Lossiemouth High School Lossiemouth Apr-22 A A A A A A A A A A A A 100.00   A
St Gerardines Primary School Lossiemouth Sep-13 B A B B B B A A B B C B 80.50      B
Lhanbryde Primary School Milnes Oct-13 B B B B B B C D B B B B 66.00      B
Milnes High School Milnes Dec-14 D C B C B C C C C C C B 49.00      C
Milnes Primary School Milnes May-14 C C B C B B C D C B B B 55.00      C
Mosstodloch Primary School Milnes Feb-23 C C B D C D C C C C B B 47.25      C
Aberlour Primary School Speyside Feb-24 B B B B B B C B C B B B 71.00      B
Craigellachie Primary School Speyside Mar-24 B B B C C C C C C C C B 56.50      C
Glenlivet Primary School Speyside May-13 C B B C B B D D B B B NA 53.09      C
Knockando Primary School Speyside Jun-13 D B C D B B B D C B B B 51.25      C
Mortlach Primary School Speyside Feb-24 D C B B C C C C C B C NA 52.84      C
Rothes Primary School Speyside Jun-13 B B B B B B C C B B B B 68.75      B
Speyside High School Speyside Sep-14 B C C D C C C B C C C B 52.25      C
Tomintoul Primary School & Public LSpeyside May-13 C B B C B B B D B B C B 58.25      C
cat. val. Definition
A 1.00 Good - Performing well and operating efficiently
B 0.75 Satisfactory - Performing adequately but showing minor deterioration
C 0.50 Poor - showing major defects and/or not operating adequately
D 0.25 Bad - Life expired and/or serious risk of imminent failure
NA Not Applicable
Page 163

Page 164

Name Last Survey
Due Date
Functionality
Accessibility
Environment
Safety &
Security
Fixed F&F
50% 15% 15% 10% 10%
Aberlour Primary School 12.03.20 12.03.25 A A B A B
Alves Primary School 20.10.20 20.10.25 A A B A B
Andersons Primary School 28.10.20 28.10.25 A B B A B
Applegrove Primary School 28.10.20 28.10.25 A A B A B
Bishopmill Primary School 04.03.24 04.03.29 B B B B B
Botriphnie Primary School 11.03.20 11.03.25 B B C B B
Buckie High School 24.01.23 24.01.28 A B B A B
Burghead Primary School 15.01.24 14.01.29 B A B B B
Cluny Primary School 01.03.20 01.03.25 A B B A B
Craigellachie Primary School 01.03.20 01.03.25 B B C B B
Crossroads Primary School* 01.03.20 01.03.25 B B C B B
Cullen Primary School 29.01.24 28.01.29 B A C B B
Dallas Primary School 29.10.20 29.10.25 A B B A B
Dyke Primary School 28.10.20 28.10.25 A A B A B
East End Primary School 01.10.20 01.10.25 A A B A B
Elgin Academy 01.04.18 01.04.23 A A A A A
Elgin High School 01.04.18 01.04.23 A A A A A
Findochty Primary School 01.03.20 01.03.25 A A B A B
Forres Academy 22.05.23 21.05.28 A A B A B
Glenlivet Primary School 01.03.20 01.03.25 A B B A B
Greenwards Primary School 01.10.20 01.10.25 A A B A B
Hopeman Primary School 01.10.20 01.10.25 A A B A B
Hythehill Primary School 01.10.20 01.10.25 A A A A A
Keith Grammar School 11.03.20 11.03.25 A A B A B
Keith Primary School (New) 01.10.20 01.10.25 A A A A A
Kinloss Primary School 24.01.24 23.01.29 B B B B B
Knockando Primary School 01.10.20 01.10.25 A A B A B
Lhanbryde Primary School 01.01.21 01.01.26 A A A A A
Linkwood 01.10.20 01.10.25 A A A A A
Logie Primary School 01.03.20 01.03.25 A B B A B
Lossiemouth High School 01.03.20 01.03.25 A A A A A
Millbank Primary School 24.01.23 24.01.28 A A A A A
Milnes High School 26.02.24 25.02.29 B B C B B
Milnes Primary School 01.03.20 01.03.25 A A B A B
Mortlach Primary School 20.03.24 20.03.29 B B C B B
Mosstodloch Primary School 01.10.20 01.10.25 A A B A B
Mosstowie Primary School 01.10.20 01.10.25 A A B A B
New Elgin Primary School 01.03.20 01.03.25 A A B A B
Newmill Primary School 01.10.20 01.10.25 A A B A A
Pilmuir Primary School 16.02.24 15.02.29 B A D B B
Portessie Primary School 01.03.20 01.03.25 A B B A B
Portgordon Primary School 01.03.20 01.03.25 B B A A B
Portknockie Primary School 01.03.20 01.03.25 A A B A B
Rothes Primary School 12.03.20 12.03.25 A A A A A
Rothiemay Primary School 01.10.20 01.10.25 A A B A B
Seafield Primary School 01.10.20 01.10.25 A A B A B
Speyside High School 12.03.20 12.03.25 A A B B A
St Gerardines Primary School 01.03.20 01.03.25 A A A A A
St Peters Primary School 01.10.20 01.10.25 B B B A B
St Sylvesters Primary School 01.03.20 01.03.25 A A C A B
St Thomas Primary School 01.03.20 01.03.25 A A B A B
Tomintoul Primary School & Public Library 01.10.20 01.10.25 A A B A B
West End Primary School 11.01.24 10.01.29 B B B A B
APPENDIX 3
Page 164

Page 165

Area
Capital Project
Project Details
2023/24
£000s
2024/25
£000s
2025/26
£000s
2026/27
£000s
2027/28
£000s
2028/29
£000s
2029/30
£000s
2030/31
£000s
2031/32
£000s
2032/33
£000
Total
£000
Schools H&S
Legionella works - Schools
15
15
15
15
15
15
15
15
15
15
150
Schools -  H&S
Schools -Fire, Safety and Security - Minor
Works
Improvements to meet safety and security
standards (incl. fire)
200
150
150
150
150
150
150
150
150
150
1,550
Schools Estate
Schools accessibility
40
40
40
40
40
40
40
40
40
40
400
School Estate
Learning Estate Strategy
Total of refurb/new
builds - to be drawn down
as strategy is developed
1,008
32,508
52,758
55,750
44,000
27,500
18,410
37,000
10,000
10,750
289,684
Schools Estate
Building element replacement
Transition to BB
1,000
1,000
2,000
School Estate
Schools - BB
Investment to bring all schools to B for
condition and B for suitability
3,000
6,500
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
89,500
Total
5,263
40,213
62,963
65,955
54,205
37,705
28,615
47,205
20,205
20,955
383,284
Breakdown of line 5
(Max Risk)
Area
Capital Project
Project Details
2023/24
£000s
2024/25
£000s
2025/26
£000s
2026/27
£000s
2027/28
£000s
2028/29
£000s
2029/30
£000s
2030/31
£000s
2031/32
£000s
2032/33
£000
Total
£000
School Estate
Elgin HS Modular Unit
2 classroom
unit planned on site until 2026
8
8
8
24
Schools - New
Build
Extension to Elgin High
Capacity increase to 1150 - internal
refurbishment and new
annex (LEIP 2)
500
6,750
11,050
1,000
19,300
Schools - New
Build
Future Buckie Campus
Secondary community campus - hybrid
approach with new
build and refurbishment)
250
1,000
29,750
39,500
17,500
1,500
89,500
Schools - New
Build
Future Forres Academy
Secondary community campus - new
build
(LEIP 3)
250
25,750
40,000
20,000
1,500
87,500
Schools - New
Build,
Extension,
Refurbuishment
Capacity Extension - Elgin South
Options for justification:
1. Extension of Greenward PS
Extensions (2025-2028)
2. New
school - Glassgreen (2029-2033)
350
2,500
1,500
11,750
12,500
2,500
31,100
Schools - New
Build,
Extension,
Refurbuishment
Capacity Extension - Elgin North
Options for justification:
1. Extension of Seafield PS
Extensions (2025-2028)
2. New
school - Findrassie (2029-2033)
350
2,500
1,500
5,160
14,500
7,500
750
32,260
Schools -
Refurbishment
Milnes HS refurbishment
Conditon and Suitability Upgrade/Maintain
10,000
10,000
Schools -
Refurbishment
Keith Grammar refurbishment
Conditon and Suitability Upgrade/Maintain
10,000
10,000
Schools -
Refurbishment
Speyside HS refurbishment
Conditon and Suitability Upgrade/Maintain
10,000
10,000
Total
1,008
32,508
52,758
55,750
44,000
27,500
18,410
37,000
10,000
10,750
289,684
Appendix 4 - Learning Estate (Indicative) Capital Plan
Learning Estate Strategy
Page 165

Page 166

Page 166

Page 167

REPORT TO: PLANNING AND REGULATORY SERVICES COMMITTEE ON 13
JUNE 2024 
SUBJECT: INFORMATION REPORT: BUILDING STANDARDS FUTURES
BOARD UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of work being carried out by the Building Standards
Futures Board and raise awareness of the workstreams which will change the
way the building standards service is delivered going forward. 
1.2 This report is submitted to Committee in terms of Section III E (4) of the
Council's Scheme of Administration relating to exercising the functions of the
Council under Building Standards Regulations and Orders and relaxations. 
2. BACKGROUND 
Futures Board Work Overview
2.1   The Building Standards Futures Board (BSFB) was set up at the beginning of 
2019 to provide guidance and direction on the development and
implementation of recommendations made by the Review Panels on
Compliance and Enforcement and Fire Safety.  The Review Panels were
formed by the Ministerial Working Group on Building and Fire Safety following
failings in the construction of Edinburgh School Buildings and the fire at
Grenfell Tower, London. 
2.2 The Board’s remit is to strategically advise and direct a broad programme of
work aimed at improving the performance, expertise, resilience and
sustainability of the Scottish Building Standards Framework and services
across Scotland. 
2.3   A number of work streams are being taken forward by the Building Standards 
Division, Scottish Government, a range of stakeholders from construction
industry organisations, professional and public bodies including Scottish
Futures Trust, Skills Development Scotland, Universities and local authorities
(through Local Authority Building Standards Scotland - LABSS). 
Page 167

Page 168

2.4   The seven work streams are:
• Workforce strategy
• Compliance plan
• Certification strategy
• Digital transformation
• Technical strategy
• Verification standards
• Delivery Models 
Workforce strategy
2.5  Across Scotland, Building Standards services are facing an ageing workforce
as well as lack of re-investment in staff and innovation of the service the
principles of the workforce strategy will focus on identifying what is required to
underpin a verification service for the future. 
2.6 The Workforce Strategy for the Building Standards Verification Service was
published on 1 October 2020 and contained 43 actions across five core
projects for delivery over a three year period. 
2.7 The aim of the strategy was to create a first-class and sustainable verification
service for the future. 
2.8  The strategy was based around four themes each with supporting national
and local commitments for delivering change. The national and local
commitments related to four key themes: 
• A profession for everyone 
• A professional framework 
• A sustainable workforce 
• A skilled workforce 
2.9 The national commitments were opportunities for Building Standards Division
to bring the influence of Scottish Government to the delivery of outcomes. 
The local commitments were hands-on activities for local authorities to lead
change across the workforce, to embed improvements arising from the
strategy for the long term. 
2.10 Delivery of actions contributed to the achievement of local and national
commitments.  The outcomes delivered crossed over different themes and
commitments.  Due to the synergies across the themes, it was sensible to
group all actions in a practical way into five core projects.  This was done to
support effective programme management and frequent reporting of progress
to verifiers. 
• Implementing the Competency Assessment System 
• Promoting the Profession 
• Implementing a Professional Framework 
• Developing Vocational Pathways 
• Developing a Learning and Development Hub 
Page 168

Page 169

Compliance plan 
2.11 Large complex projects often change during the construction journey.  Recent
building failures have highlighted the need to ensure that designs, receiving a
building warrant, are constructed in accordance with that design (especially
the safety critical features).  A compliance plan approach for complex and
high value public buildings is being explored. 
2.12 Compliance Plan process for High Risk Buildings is now developed and out
for trialling and at an early adopter stage to inform future legislation and
guidance.  It is expected this will be in place by the end of 2026 and could be
brought in sooner if it is considered that authorities will have capacity to do so. 
Certification strategy
2.13 All Certification Scheme Providers have been re-appointed from October 2020
for a period of six years.  A strategy for the future development of certification
has been agreed by the Futures Board. 
This workstream will be progressed from April 2024 however will be
dependent upon Building Standards Division resources. 
Digital transformation
2.14 An eBuilding standards national portal was introduced in 2016.  The portal
enables the electronic submission of applications for building warrants and
other forms, such as completion certificates.  This project will explore how
digital technology can support and enhance building standards. 
2.15 This area is currently moving more into a Delivery Model, verifier back office
and Compliance Plan support phase. 
Technical strategy
2.16 Technical guidance is used to meet building regulations and assist with
compliance with the mandatory functional standards. A review on how the
Technical Handbooks are developed and communicated is being undertaken.
The technical strategy will direct how Scottish Government updates and
provides guidance in the future.  The technical strategy may encompass more
digital options to improve compliance. 
Verification standards and Formation of Building Standards HUB
2.17 A review of the Operating and Performance Frameworks to assist verifiers in
assessing their service against requirements is being undertaken.  Verification
standards will focus on the quality with which verification work is undertaken
linking with the skills and experience of verifiers and applicants. 
2.18 Operating and Performance Framework 
Phase 1: Minor Updates and Hub References for April 2024.
Phase 2: Research and Wider Review to inform April 2025 and beyond
changes – customer and compliance outcome focussed. 
Auditing (planned twice in 6 year appointment) – Certification Scheme
Providers, LA Verifiers (with new Compliance and Futures Board changes and
application of increased fees focus).
Page 169

Page 170

Delivery models 
2.19 The delivery model has the 32 Scottish local authorities appointed as verifiers,
covering their own geographical area.  The need for a potentially improved
and reshaped verification delivery model was identified, including a review of
the need for central hubs of expertise. 
2.20 Scottish Building Standards Hub is in place from May 2024 (the necessary
Delivery Model strengthening) with additional Verification & Hub Resources
secured for April including increase in fees. 
2.21 Recognising broad agreement that the Hub would be best based within a local
authority to support and work with building standards teams to improve and
deliver the building standards system, Fife Council were formally invited to
host the permanent Hub from May 2024 onwards, and on the 11 January
2024, Fife Council Cabinet approved this request. 
2.22 The aim of the Scottish Building Standards Hub is to strengthen the building
standards system in Scotland by playing a key role in supporting the
transformation and quality in building standards services and the delivery of
compliant buildings through the building warrant process.  The Hub will
consist of a number of business units and employ a cohort of permanent staff
to help it achieve this.  These are: Business Unit, Operational Partnership
Unit, Learning & Development Unit, Technical & Procedural Unit, STAS Unit &
Digital Transformation Unit. 
2.23 The objectives of the Hub are closely aligned to those of the Delivery Model
Working Group: 
• Increase consistency
• Increase capacity to deliver across all types of construction work
• Provide resilience
• Drive efficiencies
• Ensure investment in skills and new technology 
2.24 The Hub is not part of the Scottish Government and will be overseen by an
Advisory Board consisting of representatives from key stakeholders such as
BSD, LABSS, COSLA/SOLACE and industry representatives.  The BSD role
within the Board is to represent the views of Scottish Ministers and the
Advisory Board will set the strategic direction of the Hub and ensure it
achieves its objectives. 
2.25 The Hub will undertake a number of activities, but not limited to, below: 
• Provide specialist expertise in fire and structural engineering
• Facilitate and support workload sharing between verifiers
• Arrange and deliver training to verifiers on new energy standards and
other areas where appropriate
• Provide access to digital transformational support
• Undertake administration of STAS, dispute resolution and Information
papers
Page 170

Page 171

• Maintain and develop a Learning Management System containing
digitised training modules
• Develop a digital skills builder platform that will provide a Competency
Assessment System (CAS) for verifiers
• Provide access to building & construction industry stakeholders for
advice and information 
2.26 The Hub will continue to develop where necessary to provide appropriate
level of support to the building standards service in Scotland.  Scottish
Government officials will provide progress reports to Ministers on the
development and progress of the Hub. 
Funding the Hub is estimated to be £1.2 – £1.3 million per year and this will
be provided through the planned annual phased increase in building warrant
fees, which will also be used to support changes to strengthen the system
being brought through the work of the Futures Board Programme. 
2.27 The first year fee increase has been agreed by the Minister, with future year
increases subject to review, and further approval from the Minister. 
2.28 The intention is that part of future years fee increase reviews will be based on
local authorities demonstrating how the fees increase will be re-invested in the
building standards service to meet the terms of the operating and
performance frameworks, including performance targets. 
2.29 Year 1 (2024/25) is designed to deliver, approximately, an increase of £5m
(14%) nationally in building warrant fee income based on modelled current fee
income.  In real terms, this would result in local authorities receiving,
approximately, an increase of 10% in fee income based on their current
income. 
2.30 Year 2 (2025/26) is designed to deliver, approximately, an increase of £8m
(23%) nationally in building warrant fee income based on modelled current fee
income.  In real terms, this would result in local authorities receiving,
approximately, a cumulative increase of 18% in fee income based on their
current income. 
2.31 Year 3 (2026/27) is designed to deliver, approximately, an increase of £12m
(35%) nationally in building warrant fee income based on modelled current fee
income.  In real terms, this would result in local authorities receiving a
cumulative increase of 30% in fee income based on their current income. 
2.32 In 2026/27 the Building Standards Division envisage the enhanced
compliance plan will be introduced for High Risk Buildings (HRB) and as such,
an enhanced, HRB fee will also be introduced to the fee model. 
3. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
The 10 year plan’s top priority is a growing, diverse and sustainable
economy.  It covers business, employment, infrastructure, public
Page 171

Page 172

services and developing sustainable communities.  Delivering
improvements to the building standards service is a vital aspect of
supporting and facilitating the Council’s priority for economic growth and
supports the Service Plan to deliver service improvements. 
(b) Policy and Legal
Building (Scotland) Act 2003 
It is a responsibility of all building standards services to meet the
Operating and Performance Frameworks for verifiers as part of our terms
of appointment.  Current appointment period extends to April 2029.
However we require to meet this through the period through auditing. 
The Scottish Ministers have powers to give verifiers directions of a
general or specific character as to the exercise of their functions under
the Building (Scotland) Act 2003.  This intervention would come when a
building standards service is not meeting, or have not been, satisfactorily
performing in terms of the agreed terms of appointment.  Demonstrating
that the building standards service meets or exceeds the requirements of
the outcomes and framework is vital in retaining the appointment for the
geographical area of Moray. 
(c) Financial implications
There are no direct financial implications arising from this report at this
stage.  However, there are increased fee income over a 3 year period
highlighted however this comes with financial risks associated, increased
expectations and workloads. 
(d) Risk Implications
There is a risk if this authority doesn’t continue to drive change in terms
of resourcing the building standards service there will be an impact on
supporting sustainable economic growth. 
The appointment in 2020 was conditional on the service meeting the
Operating Framework and the Performance Framework.  This includes
satisfying Scottish Ministers that we are meeting, and continue to meet,
performance measures.  The annual performance report and auditing will
be key to demonstrating how we meet the frameworks, how continuous
improvement is being achieved and how increased income is being
reinvested back into the service.  Risk of not meeting our terms of
appointment is that we are not appointed as verifiers or the period of
appointment is reduced. 
(e) Staffing Implications
Currently no staffing resource implications arising from this report
however as the workstreams come to fruition, clarity received on intent,
and the operating and performance frameworks are updated in 2025,
staff resources will require to be considered to achieve performance
levels and make further improvements to meet our obligations as a
verifier.   
Page 172

Page 173

Any significant increases in building warrant applications would likely
impact on performance but would depend on their complexity.   
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts
No climate Change and Biodiversity implications for the local authority
arise from the content of this report. 
(i) Consultations
Depute Chief Executive (Economy, Environment & Finance),
Head of Economic Growth and Development, Legal Services Manager,
Lissa Rowan (Committee Services Officer), Equal Opportunities Officer,
Principal Climate Change Officer, Anne Smith (Senior HR Adviser) 
4. CONCLUSION 
4.1   This report summarises the current workstreams of the Building 
Standards Futures Board. These are key areas of work which will require
integration into our priorities going forward with a view to providing an
improved building standards service both within Moray and Nationally. 
Author of Report: William Clark, Acting Development Management &
Building Standards Manager 
Background Papers: 
Ref: 
Page 173

Page 174

Page 174