Planning and Regulatory Services Committee 
Tuesday, 12 March 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Planning and Regulatory
Services Committee is to be held at Council Chambers, Council Office, High
Street, Elgin, IV30 1BX on Tuesday, 12 March 2024 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minutes 
3a. Minute of the meeting held 19 December 2023 7 - 34
3b. Minute of the Special Meeting held 15 February 2024 35 - 64
4. Written Questions ** 
Guidance Note 65 - 66
5. Planning Applications 23/00892/APP, 23/00894/APP and
23/00895/APP
Report by Appointed Officer
Construction and operation of an aerobic digestion facility and energy
centre with associated landscaping and drainage works on Land
Approximately 150 Metres To The West Of The Portgordon Maltings,
Buckie for Grissan Engineering Services Ltd (23/00892/APP)
Construction and operation of an aerobic digestion facility and energy
centre with associated works Land Approximately 200 Metres To The
West Of The Portgordon Maltings, Buckie Moray for Grissan
Engineering Services Ltd (23/00894/APP)
Construction and operation of an aerobic digestion facility and energy
centre with associated works Land Approximately 250 Metres To The
West Of Portgordon Maltings Buckie Moray for Grissan Engineering
Services Ltd (23/00895/APP)
67 -
116
Page 1

Page 2

6. Planning applications 23/01848/APP, 23/01851/APP,
23/01852/APP and 23/01853/APP
Report by Appointed Officer
Section 42 of the Town and Country Planning (Scotland) Act 1989 to
amend condition 18 of planning permission 18/01046/EIA to amend
construction working hours From Within The Vicinity Of Redhythe Point
In Aberdeenshire Council Area To Whitehillock Farm Keith Moray for
Moray Offshore Wind Farm (West) Limited  
Section 42 of the Town and Country Planning (Scotland) Act 1997 to
amend condition 7 of planning permission reference 21/01402/AMC, to
amend working hours From The Vicinity Of Redhythe Point In
Aberdeenshire Council Area To Whitehillock Farm Keith Moray AB55
5PH for Moray Offshore Windfarm (West) Ltd 
Section 42 of the Town and Country Planning (Scotland) Act 1997 to
amend condition 4 of planning permission reference 21/01561/AMC to
amend construction working hours From Within the Vicinity Of
Redhythe Point In Aberdeenshire Council Area To Whitehillock Farm
Keith Moray for Moray Offshore Windfarm (West) Ltd   
Section 42 of the Town and Country Planning (Scotland) Act 1997 to
amend condition 7 of planning permission reference 21/01391/APP to
amend construction working hours on Land Between Greenhill And
Factors Park Plantation Deskford Cullen Moray for Moray Offshore
Windfarm (West) Ltd
117 -
156
7. Planning Application 23/02019/AMC
Report by Appointed Officer
Approval of the matters specified in condition 4 (layout of plot)
condition 5 (plans sections and elevations) condition 6 (boundary
treatments and other development) condition 7 (sections) condition 8
(landscaping), condition 10 (affordable housing) and condition 11
(enhanced accessibility) of 19/00320/PPP to provide 16 houses and
associated cohousing buildings on Plot 8, 9, 11, 12 And 13.1 On Land
At North Whins, The Park, Findhorn, Moray for Duneland Limited  
157 -
178
8. Proposal of Application Notice - 24/00058/PAN
Report by Depute Chief Executive (Economy, Environment and
Finance)
Proposed formation of quarry for the processing of sand and gravel
and production of ready-mix concrete on land to the south-east of
Dykeside Farm, Birne, Elgin
179 -
184
9. Proposal of Application Notice - 24/00162/PAN
Report by Depute Chief Executive (Economy, Environment and
Finance)
Revised proposal for the development of housing associated
landscape and infrastructure in the area identified in the Bilbohall
Masterplan at R2 Bilbohall, Elgin
185 -
190
10. Moray Local Development Plan 2020 - Monitoring Report
2023
Report by Depute Chief Executive (Economy, Environment and
Finance)
191 -
272
Page 2

Page 3

11. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Summary of Planning and Regulatory Services
Committee functions:
Town and Country Planning; Building Standards; Environmental
Health; Trading Standards; Weights & Measures, Tree Preservation
Orders, and Contaminated Land issues.     
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

MORAY COUNCIL 
Planning and Regulatory Services Committee 
SEDERUNT 
Councillor David Gordon  (Chair)
Councillor Marc Macrae  (Depute Chair)  
Councillor Neil Cameron  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Donald Gatt  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Paul McBain  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
MINUTE OF MEETING OF THE PLANNING & REGULATORY SERVICES
COMMITTEE 
19 DECEMBER 2023 
COUNCIL CHAMBERS, ELGIN 
PRESENT 
Councillors Gordon (Chair), Macrae (Depute Chair), Coull, Cowe, Divers, Dunbar,
Fernandes, Gatt, Keith, Lawrence, McBain, Ross and Warren 
APOLOGIES 
Councillors Cameron and Van Der Horn 
IN ATTENDANCE 
Head of Economic Growth and Development, Mr N MacPherson, Principal Planning
Officer, Mr A Miller, Senior Planning Officer, Mrs L MacDonald, Senior Planning
Officer, Ms Webster, Principal Planning Officer (Strategic Planning and
Development), Mrs D Anderson, Senior Engineer (Transportation), Mr D
Westmacott, Planning Officer, Mr R Anderson, Principal Environmental Health
Officer, Legal Services Manager and Mrs L Rowan, Committee Services Officers as
Clerk to the Committee. 
1. Best Wishes 
Councillor Cowe, Civic Leader advised the Committee that Councillor Cameron had
recently been admitted to hospital with a sudden illness and the Committee joined
Councillor Cowe in wishing Councillor Cameron a speedy recovery. 
2. Declaration of Group Decisions and Member’s Interests 
In terms of Standing Order 21 and 23 and the Councillor's Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda. 
Councillor Divers declared an interest in Item 7 “Planning Application 23/00494/APP”
as his son is employed by the Applicant, and stated that the would leave the
chamber during discussion of this item and take no part in the decision. 
There were no further declarations of Members interests in respect of any item on
the agenda. 
Item 3a.
Page 7

Page 8

With regard to Item 7 “Planning Application 23/0049/APP”, Councillor Ross
acknowledged that Speyside Community Council had made a representation on the
application.  He clarified that the role of the Community Council which is to represent
the view of the community and not individual members and that he and Councillor
Gordon had not taken part in any discussion at meetings between the Applicant and
the Community Council in relation to this proposal.  With regard to the representation
made by Speyside Community Council, of which his wife is the Chair, Councillor
Ross stated that this represented the view of the community and not any particular
person and, after due consideration, stated that he would remain in the chamber and
take part in the consideration of this item. 
3. Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting during consideration of the items of business
appearing at the relevant paragraphs of this minute as specified below, so as to
avoid disclosure of exempt information of the class described in the appropriate
paragraphs of Part 1 of Schedule 7A of the Act. 
Paragraph No. of Minute  Paragraph No. of Schedule 7A
19 12 
4. Minute of meeting dated 24 October 2023 
The Minute of the meeting dated 24 October 2023 was submitted and approved. 
5. Minute of meeting dated 26 June 2023 
The Minute of the meeting dated 26 June 2023 was submitted and approved. 
6. Written Questions 
The Committee noted that no written questions had been submitted. 
7. Planning Application 23/00494/APP 
Councillor Divers, having declared an interest in this item, left the meeting at this
juncture. 
Councillor Warren joined the meeting at this juncture. 
Ward 1 – Speyside Glenlivet 
Page 8

Page 9

Erect 39 affordable homes at R2 Speyview, Aberlour, Moray for Springfield
Properties PLC 
The Committee had before it a report by the Appointed Officer recommending that,
for reasons detailed in the report, planning permission be granted for an application
to erect 39 affordable homes at R2 Speyview, Aberlour, Moray for Springfield
Properties PLC. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as the Appointed Officer considers that, following the
consultation process, it raises matters of wider community interest. 
During his introduction, Mr MacPherson, Principal Planning Officer confirmed a
change to condition 15 following further discussion with Transport Scotland which
referenced various plans and documents regarding the proposed pedestrian
crossings on the A95 which should be approved by Transport Scotland as well as
the Council prior to any occupation.  This was noted. 
During discussion, the Committee raised a number of points in relation to the
location of the development, particularly regarding the safety of junctions and
crossing points given the speed of traffic on the A95. 
Mrs Anderson, Senior Engineer (Transportation) advised that a Road Safety Audit
would be carried out at an appropriate point during the development and that traffic
calming measures would be introduced if required. 
Councillor Ross stated that he was very concerned about the safety of the public
when entering or leaving the development due to the speed of traffic on the A95.  He
also raised concerns in relation to active travel given the gradient of the route which
would be challenging to walk given the distance of the development from the centre
of Aberlour.  He was of the view that the location of the site would leave people
isolated and lonely due to the lack of public transport in the area, unless they had
use of a vehicle.  Councillor Ross noted that, since the Moray Local Development
Plan had been adopted in 2020, the Council had also adopted National Planning
Framework (NPF) 4 and was of the view that the proposal did not comply with policy
13 of NPF4 as there is no cycle path or designated route and no public transport on
evenings or weekends.  He also was of the view that the proposal did not comply
with NPF4 policy 14 as the development was not well connected and residents
would have to have use of a vehicle to access shops and services.  Furthermore, he
was of the view that the proposal did not comply with NPF4 policy 15 in terms of the
requirements for 20 minute neighbourhoods.  Councillor Ross therefore moved that
the Committee refuse planning permission in relation to Planning Application
23/00494/APP for the reasons stated.  This was seconded by Councillor Macrae. 
Councillor Coull stated that Aberlour desperately needed affordable housing and was
confident that the transportation issues would be addressed in due course and
moved, as an amendment, that the Committee agree to grant planning permission in
relation to Planning Application 23/00494/APP, as recommended by the Appointed
Officer.  This was seconded by Councillor Lawrence. 
Page 9

Page 10

On a division there voted: 
For the Motion (5): Councillors Ross, Macrae, Gatt, Keith and McBain 
For the Amendment (7): Councillors Coull, Lawrence, Cowe, Dunbar, Fernandes,
Gordon and Warren 
Abstentions (0): Nil 
Accordingly, the Amendment became the finding of the Meeting and the Committee
agreed to grant planning permission, as recommended, in respect of Planning
Application 23/00494/APP, subject to: 
(i) payment of developer obligations; and 
(ii) the following conditions and reasons with an amendment to condition 15
following further discussion from Transport Scotland in relation to the proposed
pedestrian crossings on the A95 which should be approved by Transport
Scotland as well as the Council prior to any occupation: 
Conditions/Reasons 
1. Prior to the commencement of development details of the affordable housing
specification shall be submitted to and approved by the Council, as Planning
Authority in consultation with the Housing Strategy and Development Manager
regarding the detailed arrangements for the delivery and provision of the
affordable housing on the site, which shall include confirmation of the identity of
the organisation (or other similar agency) responsible for the provision and
management of all affordable housing provided on the site for the lifetime of the
development. Thereafter the development shall be implemented in accordance
with the approved details.   
Reason: To ensure all the residential units approved on site are affordable and
managed accordingly.   
2. All residential units within the development shall be provided and retained as
affordable housing for the lifetime of the development unless otherwise agreed
in writing with the Council as Planning Authority in consultation with the
Housing Strategy & Development Manager. 
Reason: To ensure an acceptable form of development in terms of the required
provision and delivery of affordable housing. 
3. Prior to development commencing, a Construction Environmental Management
Plan (CEMP) shall be submitted to and agreed in writing by the Council, as
Planning Authority in consultation with the Environmental Health Manager. The
plan shall include measures to minimise construction related noise, vibration,
dust, and artificial lighting, a pollution prevention plan to protect the water
environment, waste management plan and ecological mitigation plan.
Page 10

Page 11

Thereafter the development will be carried out in accordance with the agreed
plan. 
Reason: In order that potential polluting activities are considered and
managed, to protect local residents and the environment. 
4. Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive
dwelling shall be permitted between 0800 - 1900 hours, Monday to Friday and
0800 - 1300 hours on Saturdays only, and at no other times out with these
permitted hours (including National Holidays). The above construction hours
shall apply, unless otherwise agreed in writing with the Planning Authority, and
where so demonstrated exceptional operational constraints require limited
periods of construction works to be undertaken out with the permitted
construction hours. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
5. The air source heat pumps must be installed and maintained in accordance
with the Microgeneration Scheme guidance: - MCS 020 MCS Planning
Standards for Permitted Development Installations of Wind Turbines and Air
Source Heat Pumps on Domestic Premises. 
Reason: To protect local residents from noise nuisance due to the use of the
development. 
6. No development shall commence until details of protection measures of
existing private water supplies leading through the site (both during
construction and for the lifetime of the development) have been submitted to
and agreed in writing with the Council as Planning Authority. Thereafter the
development shall be implemented in accordance with the agreed details,
unless otherwise agreed with the Planning Authority. 
Reason: In order to safeguard the water supplies which serve the neighbouring
houses. 
7.  No development shall commence until an amended Landscape and Biodiversity
Plan has been submitted to and approved by the Council, as Planning
Authority. This shall be closely based upon the Detailed Landscaping Layout
drawing number AB02_L_01 Rev C and Landscape Management Plan number
AB02_L_02, and show the following: 
(a)   additional tree, shrub, and hedge planting along the active travel route to
provide a buffer between the development and existing housing along the
A95,  
(b)   locations and specifications of bird and bat boxes (minimum, 6 of each) on
the site, as recommended in the Preliminary Ecological Appraisal (update
Page 11

Page 12

2) prepared by Rachael Thwaites, Ecological Consultant dated 6
September 2023, 
(c)  the time-scale(s) for all new planting, seeding and turfing to be undertaken
on the site for each phase / character area on the site, and including the
planting blocks to the south and east shown outwith the site boundary on
the masterplan drawing contained within the accompanying document
titled Design Statement July 2023 Rev A. 
Thereafter, the landscaping arrangements shall be carried out in accordance
with the approved details. Any trees or plants which (within a period of 5 years
from the planting) die, are removed or become seriously damaged or diseased
shall be replaced in the following planting season with others of similar size,
number and species unless this Council as Planning Authority gives written
consent to any variation of this planning condition. 
Reason: To ensure the provision of an acceptable level of planting at the
development in the interests of the amenity, to enhance biodiversity in the area,
and to ensure the approved landscaping works are timeously carried out and
properly maintained in a manner which will not adversely affect the
development or amenity and character of the area. 
8. The mitigation recommendations as detailed within the accompanying Badger
Survey Report, prepared by Walking-the-Talk dated 15 September 2023, shall
be fully implemented by the developer, unless otherwise agreed in writing by
the Council, as Planning Authority. 
Reason: To ensure that the development does not have an adverse impact on
protected species or habitat and minimise disturbance to nature conservation
interests and enhance biodiversity. 
9. Unless otherwise agreed in writing with the Council as Planning Authority, the
equipped play area shall be provided in accordance with the approved plans
titled Phase 1 Play Area AB02-R_PL_10 Rev B and specification plan prepared
by ‘Produlic’ dated 13/11/2023, reference 2311.40920
(SpeyviewAberlour_SpringfieldProperties PLC) prior to the commencement of
the 20th residential unit on site. Thereafter the equipped play area shall be
maintained in accordance with the details set out in the approved landscape
management plan for the lifetime of the development. 
Reason: To ensure the timeous provision of the play area. 
10. Prior to the commencement of the 20th residential unit on site, finalised details
of the public artwork and street-naming on the site, closely based upon the
submitted drawings AB02-R_PL_09 C and 09 A Public Art, including timescale
for provision shall be submitted to and approved to and approved by the
Council, as Planning Authority.  Thereafter the development shall be
implemented in accordance with these approved details, plans and timescales,
unless otherwise agreed by the Council. 
Page 12

Page 13

Reason: To ensure distinctive urban form with public art to provide good
orientation and navigation. 
11. No development shall commence until a construction phase surface water
management plan has been submitted to and approved by the Council, as
Planning Authority in consultation with Moray Flood Risk Management.
Thereafter the development shall be carried out in accordance with the agreed
details. 
Reason - To prevent surface water flooding and pollution during the course of
the development and minimise risk to the River Spey SAC. 
12. The surface water drainage arrangements detailed in the approved drawings
and Drainage Strategy Report Rev C prepared by Springfield Properties shall
be completed prior to the first occupation of any housing unit in the
development or its completion whichever is the sooner, and thereafter
maintained for the lifetime of the development in accordance with the approved
Drainage Strategy, unless otherwise agreed by the Council, as Planning
Authority. 
Reason: To ensure that surface water drainage is provided timeously, and
complies with the principles of SUDs to protect the water environment. 
13. No development shall commence until a Community Wealth Building Plan has
been submitted to and approved in writing by the Council, as Planning
Authority. This plan shall include measures, targets and monitoring for the
following areas as appropriate: 
(a)   improving community resilience, reducing inequalities and maximising
local job creation at the development (training, apprenticeships, etc.) and 
(b)   increasing spending within communities and ensuring the maximum use
of local supply chains and services to be applied to the site. 
The measures and monitoring shall thereafter be implemented in accordance
with the plan unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason: To support a new strategic approach to economic development that
helps to build a wellbeing economy in accordance with National Planning
Framework 4 Policy 25 - Community Wealth Building. 
14. Prior to the commencement of any development hereby permitted (other than
the formation of a temporary construction access and siting of the works
compound to allow delivery of the new trunk road access junction), the new
ghost island priority junction with the A95(T), generally as illustrated in the
Cameron and Ross Drawing No. A1/1804741-1001 (Revision 4) Proposed A95
Improvements Layout, shall be constructed to the satisfaction of the Planning
Authority, after consultation with Transport Scotland. 
Page 13

Page 14

Reason: To ensure that the standard of access layout complies with the
current standards, and that the safety and free flow of traffic on the trunk road is
not diminished. 
15. Prior to occupation of any part of the development hereby permitted, a new
active travel link, generally as illustrated in Springfield Properties Drawing No.
AB02-ENG-602 (Revision B) Active Travel Route Layout, and associated works
as generally illustrated in ECS Active Travel Review Appendix D: Drawing No.
23097_002 Proposed Pedestrian Crossing – Forward Sight Distance and
Appendix E: Cameron and Ross Drawing No. A/1804741-1017 Offsite Footpath
Upgrades shall be constructed to the satisfaction of the Planning Authority,
after consultation with Transport Scotland. 
Reason: To ensure that facilities are provided for the pedestrians that are
generated by the development and that they may access the existing footpath
system without interfering with the safety and free flow of traffic on the trunk
road. 
16. Prior to occupation of any part of the development hereby permitted, new bus
stop lay-bys on both sides of the A95(T), generally as illustrated in Cameron +
Ross Drawing Numbers A1/180471 – 1002 (Revision 2) Bus Stop Lay-by
Layout (North of Proposed Junction) and A1/180471 – 1003 (Revision 3) Bus
Stop Lay-by Layout (South of Proposed Junction), shall be constructed to the
satisfaction of the Planning Authority, after consultation with Transport
Scotland. 
Reason: To be consistent with the requirements of Scottish Planning Policy
(SPP) and PAN 75 Planning for Transport. 
17. Prior to commencement of the development, details of the landscaping
treatment along the trunk road boundary shall be submitted to, and approved
by, the Planning Authority, after consultation with Transport Scotland. All
landscaping shall be located such that it can be installed and maintained from
within the development without requiring access to the trunk road. 
Reason: To ensure that there will be no distraction to drivers on the Trunk
Road and that the safety of the traffic on the Trunk Road will not be diminished. 
18. Prior to commencement of the development, details of the fencing / barrier
proposals along the trunk road boundary shall be submitted to, and approved
by, the Planning Authority, after consultation with Transport Scotland and
thereafter implemented prior to commencement of operation. The fencing /
barrier proposals shall be located such that they can be erected and maintained
from within the development without requiring access to the trunk road. 
Reason: To minimise the risk of pedestrians and animals gaining uncontrolled
access to the trunk road with the consequential risk of accidents. 
19. There shall be no drainage connections to the trunk road drainage system. 
Page 14

Page 15

Reason: To ensure that the efficiency of the existing trunk road drainage
network is not affected.
20. No development shall commence until the follow details have been submitted
for approval in writing by the Planning Authority in consultation with the Roads
Authority: 
• A Road Safety Audit / Safety Audit of the potential non-motorised user
route(s) between the development and the A95(T) bridge over the Linn
Burn. Prior to commencement the scope of the audit shall be submitted
for approval in writing with the Moray Council Transport Development
team.
• Details of the proposed mitigation measures to address any issues
identified by the Road Safety Audit/Safety Audit. 
Thereafter, the Road Safety Audit / Safety Audit and mitigation measures shall
be completed in accordance with the approved details prior to the completion of
any house within the development. 
Reasons: To ensure acceptable development in the interests of road safety
and the provision of details currently lacking from the submission. 
21. Notwithstanding the details submitted on the adoption plan drawings (Drawing
No AB02-ENG-515 Rev F) and Kerbing Plan (AB02-ENG-510 Rev F), which
are contrary to the site plan (Drawing No. AB02-R_PL_01 Rev B), prior to the
commencement of development the following details shall be submitted for the
approval by the Planning Authority in consultation with the Roads Authority: 
a) Adoption Plan (Scale 1:500 minimum) showing a 3 metre cyclepath on the
west side of the road leading south from the crossroads to the end of the
adopted road.
b) Details, including maintenance arrangements for hedges to be planted
adjacent to parking spaces which shall be planted at least 1.0 metres from
the edge of the parking space to readily enable access into and out of
parked vehicles at all times. 
Thereafter the development shall be constructed in accordance with the
approved details. 
Reasons:
a) To ensure acceptable development through the provision of details
currently lacking from the submission.
b) To ensure an acceptable development in terms of parking provision and
amenity of the area. 
22. Notwithstanding the details of parking for Plots 21 and 22 (Type F – 4 Bed)
shown on the site layout plan (Drawing AB02-R_PL_01 Rev B) which indicate a
space for only 2 spaces per plot, no development shall commence until details
(Site Layout Plan scale 1:500 min) has been submitted for approval in writing
by the Planning Authority in consultation with the Roads Authority which
confirms the location of a minimum of 3 parking spaces to serve each 4 bed
Page 15

Page 16

plot. Thereafter parking provision shall be provided and maintained for use in
accordance with the approved site layout plan unless otherwise agreed in
writing with Moray Council Transportation. 
Reason: To ensure the permanent availability of the level of parking necessary
for residents/visitors/others in the interests of an acceptable development and
road safety. 
23. Notwithstanding the Travel Information Pack submitted, which is not accepted,
prior to completion of the first house, a Travel Information Pack shall be
submitted for approval in writing by the Planning Authority in consultation with
the Roads Authority, which includes the following information: 
a) Information on routes for pedestrians and cyclists to access local facilities. 
b) Information on the provision of bus services including demand responsive
services serving the development. 
c) Information on the availability and accessibility of local public car and
ebike/cycle sharing schemes.
d) Details of the programme for updating the Travel Information Pack as the
development progresses. 
Thereafter the Travel Information Pack shall be provided to each dwelling upon
first occupation from the date of first completion of any part of the residential
development. 
Reason: To ensure the provision of acceptable sustainable transport
information through the provision of details currently lacking in the interests of
reducing the impact of travel and transport on the environment. 
24. Prior to the commencement of development the following shall be submitted for
approval by the Planning Authority in consultation with the Roads Authority: 
a) A Construction Traffic Management Plan which includes details of any
temporary site access arrangements, site compounds, lay down areas
and site parking (Plan scale 1:500 minimum) and proposals to safeguard
non-motorised road users;
b) Details (Plan scale 1:500) which show the provision of a temporary turning
area, including details of the construction of the turning area, adjacent to
Plots 35/36 to provide a turning facility for refuse collection vehicles and
other visiting vehicles. 
The approved Construction Traffic Management Plan must be complied with at
all times. The works identified in b) shall be completed prior to completion or
first occupation of any of the plots numbered 29 to 39 and shall be retained until
such time that the road ends at Plots 35/36 and Plots 13/14/15/16 are
connected via a loop road and available for use by visiting service vehicles. 
Reasons: 
a) To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site.
Page 16

Page 17

b) To ensure acceptable infrastructure to service the development through
the provision of details currently lacking. 
25. No boundary fences, hedges, walls or any other obstruction whatsoever over
1.0m in height and fronting onto the public road shall be within 2.4m of the edge
of the carriageway. 
Reason: To ensure acceptable development that does not create any hazard
to road users in the interests of road safety. 
26. The width of the individual vehicular accesses shall be 3.0m – 5.0m and have a
maximum gradient of 1:20 measured for the first 5.0m from the edge of the
public carriageway. The part of the access over the public footway shall be to
The Moray Council specification and surfaced with bituminous macadam. 
Reason: To ensure acceptable infrastructure at the individual development
accesses. 
Councillor Divers re-joined the meeting that this juncture 
8. Planning Application 23/00994/APP 
Ward 4 – Fochabers Lhanbryde 
For the construction and operation of a 30 MW battery energy storage system
including associated infrastructure at land to east of A941 Bishopmill, Elgin,
Moray for Green Power Consultants Ltd 
The Committee had before it a report by the Appointed Officer recommending that,
for reasons detailed in the report, planning permission be granted for an application
for the construction and operation of a 30 MW battery energy storage system
including associated infrastructure at land to east of A941 Bishopmill, Elgin, Moray
for Green Power Consultants Ltd. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as the application is a Major application as the proposal
relates to electricity generation with a capacity of more than 20MW. 
Councillor Macrae considered the proposal to be a worthy departure from the Moray
Local Development Plan 2020 as the Council moves towards net zero and welcomed
the fire risk and safety information provided within the planning application and
moved that the Committee grant planning permission, as recommended, in respect
of Planning Application 23/00994/APP. 
In relation to Condition 15 regarding protection of trees, Councillor Gatt sought
clarification as to whether this protection was during construction of the development
or the completion of the development after 40 years. 
Page 17

Page 18

In response, Mr Miller advised that these protection measures would be during the
construction process and suggested an update to condition 16 to reflect that any
trees that die during the 40 year period of any consent are replaced during the
appropriate planting season.   
Councillor Gatt welcomed this suggestion and then went on to discuss the
emergency response plan and fire risk assessment which the Applicant had agreed
to develop once the battery products had been decided and queried whether, as
there had been concerns about the safety of such developments, a condition could
be added to ensure the fire risk assessment is in place prior to the operations
commencing on the site. 
In response, Mr Miller, Senior Planning Officer agreed to include a condition as
suggested by Councillor Gatt. 
Having considered the response from Mr Miller, Councillor Gatt agreed to second
Councillor Macrae’s motion subject to an amendment to condition 16 in relation to
the protection of trees and the additional condition in relation to the fire risk
assessment. 
The Chair queried whether Councillor Macrae was content to include the amendment
to condition 16 and the additional condition in his motion.  Councillor Macrae agreed
to this. 
There being no-one otherwise minded, the Committee unanimously agreed to grant
planning permission, as recommended, in respect of Planning Application
23/00994/APP subject to: 
• an amendment to condition 16 to ensure that any trees that die during the 40
year period of the consent are replaced during the appropriate planting
season; 
• an additional condition to ensure that the fire risk assessment is in place prior
to the operations commencing on the site; and
• the following conditions and reasons: 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act
1997 as amended. 
2. This permission shall endure for a period of 40 years from the date on which
the site first connects to the grid network within which period the development
shall cease to operate and cease to connect to the grid network and the site
shall be restored in accordance with a detailed decommissioning, restoration
and aftercare statement to be approved in writing in advance by the Planning
Authority. Written confirmation of the date of first connection to the grid network
shall be provided to the Planning Authority within 12 months of this occurrence.
Page 18

Page 19

For the avoidance of doubt the detailed decommissioning, restoration and
aftercare plan shall provide detailed proposals, in accordance with relevant
guidance at that time, for the removal of the Development, the treatment of
ground surfaces, the management and timing of the works and environment
management provision which shall include waste management proposals. 
Reason: To ensure that the development is removed at the end of its use and
to ensure the satisfactory restoration of the site. 
3. No development shall commence until final details of the material finishes of all
buildings and plant including battery storage containers, as well as full details of
the means of enclosure have been submitted to and agreed in writing by the
Planning Authority. For the avoidance of doubt the battery storage containers
shall be finished in grey or green as indicated in the submitted supporting
information with the application. Where possible darker recessive tones shall be
used. Thereafter only the approved details shall be implemented. 
Reason: Insufficient details have been provided with the proposal. 
4.  No works in connection with the development hereby approved shall
commence unless an archaeological Written Scheme of Investigation (WSI)
has been submitted to and approved in writing by the planning authority and a
programme of archaeological works has been carried out in accordance with
the approved WSI. The WSI shall include details of how the recording and
recovery of archaeological resources found within the application site shall be
undertaken, and how any updates, if required, to the written scheme of
investigation will be provided throughout the implementation of the programme
of archaeological works. Should the archaeological works reveal the need for
post excavation analysis the development hereby approved shall not be
brought into use unless a Post-Excavation Research Design (PERD) for the
analysis, publication and dissemination of results and archive deposition has
been submitted to and approved in writing by the Planning Authority. The
PERD shall be carried out in complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. 
5. No development shall commence until: 
i.   a detailed drawing (scale 1:500 or 1:1000 which shall also include details
to demonstrate control of the land through ownership or provision of third
party agreement) showing the visibility splay 4.5 metres by 215 metres in
both directions at the access onto the A941 Lossiemouth - Elgin -
Dufftown - Rhynie Road with all boundaries set back to a position behind
the required visibility splay, and a schedule of maintenance for the splay
area has been submitted to and approved in writing by the Council, as
Planning Authority in consultation with the Roads Authority; and 
ii.   thereafter the visibility splay shall be provided in accordance with the
approved drawing prior to any works commencing (except for those works
associated with the provision of the visibility splay); and 
Page 19

Page 20

iii.   thereafter the visibility splay shall be maintained at all times free from any
obstruction exceeding 0.26 metres above the level of the carriageway in
accordance with the agreed schedule of maintenance. 
Reason: To enable drivers of vehicles entering or exiting the site to have a
clear view so that they can undertake the manoeuvre safely and with minimum
interference to the safety and free flow of traffic on the public road through the
provision of details currently lacking. 
6. No water shall be permitted to drain or loose material be carried onto the public
footway/carriageway. 
Reason: To ensure the safety and free flow of traffic on the public road and
access to the site by minimising the road safety impact from extraneous
material and surface water in the vicinity of the new access. 
7. No development shall commence until a Construction Traffic Management Plan
(CTMP) has been submitted to and agreed in writing by the Planning Authority
in consultation with the Roads Authority. Thereafter the development shall be
carried out in accordance with the agreed CTMP at all times. For the avoidance
of doubt the CTMP shall include as a minimum the following information: 
•   duration of works; 
•   construction programme; 
•   number of vehicle movements (i.e. materials, plant, staff, components); 
•   schedule for delivery of materials and plant; 
•   parking provision, loading and unloading areas for construction traffic; 
•   full details of temporary arrangements to safeguard pedestrian
movements during the construction period; 
•   full details of any temporary access; 
•   measures to be put in place to prevent material being deposited on the
public road;
•   traffic management measures to be put in place during works including
any specific instructions to drivers. 
•   full details of construction traffic routes from/to the site, including any
proposals for temporary haul routes and routes to be used for the disposal
of any materials from the site; 
•   a programme of monitoring for all routes identified within the CTMP during
construction will be required. 
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site. 
8. No works shall commence on site until a Method Statement setting out the
working practices and detailed drawings related to underground cable laying in
the vicinity of the U39E Myreside Road, A941 Lossiemouth – Elgin – Dufftown
– Rhynie Road, Elgin – Lossiemouth cycle track and C24E Elgin - Westerfolds -
Duffus Road has been submitted to and approved in writing by the Council as
Planning Authority in consultation with the Roads Authority. Thereafter, the
Page 20

Page 21

development works shall proceed in accordance with the approved details,
unless otherwise approved in writing by the Planning Authority in consultation
with the Roads Authority. 
Reason: To ensure acceptable working practices in the vicinity of the public
infrastructure through the provision of details currently lacking. 
9. Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive
dwelling shall be permitted between 0800 - 1900 hours, Monday to Friday and
0800 - 1300 hours on Saturdays only, and at no other times outwith these
permitted hours (including National Holidays) shall construction works be
undertaken except where previously agreed in writing with the Council, as
Planning Authority and where so demonstrated that operational constraints
require limited periods of construction works to be undertaken outwith the
permitted/stated hours of working. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
10. Prior to development commencing, a Construction Environmental Management
Plan (CEMP) shall be submitted to and agreed in writing by the Planning
Authority in consultation with the Environmental Health Manager. The plan shall
include:
• measures to minimise construction related noise, dust and artificial
lighting;
• a scheme for the management of surface water drainage during the
construction process;
• a scheme to ensure soils on and around the site are protected from
unnecessary disturbance including erosion and compaction to minimise
soil sealing. 
Thereafter the development will be carried out in accordance with the agreed
plan. 
Reason: In order that environmental emissions are considered and managed
at the construction phase, in order to protect local residents, the Sey Burn and
soils on and around the site. 
11. The rating level of noise associated with the development shall not exceed 41
dB at the nearest noise sensitive dwelling which is lawfully existing or has
planning permission at the date of this permission . For the avoidance of doubt,
the rating level associated with this condition is defined within BS 4142:
2014+A1:2019 Methods for rating and assessing industrial and commercial
sound. The rating level in this condition will apply for either daytime (0700 to
2300 hours) or night time (2300 to 0700 hours) periods. 
Reason: To protect local residents from noise nuisance due to the use of the
development. 
Page 21

Page 22

12. Unless otherwise agreed with the Planning Authority, a 4m high acoustic fence
with a surface density of at least 10kg/m2 shall be provided on the south east
and south west elevations of the development as illustrated in Figure D.2, page
28 of the approved Noise Impact Assessment supporting document by Parker
Jones Acoustics and titled "Land at Spynie Farms, Elgin, Moray, IV30 4LF.
Noise Impact Assessment. 1st December 2023 Revision 1", as well as indicated
in Drawing No. APA-612-DR-PL-003 Revision 4, dated 08/11/23 and titled
"Proposed Site Layout”. Prior to the use commencing, the final selected
acoustic barrier in terms of chosen material, design, surface density shall be
submitted in a plan and agreed in writing with the Council, as Planning
Authority and shall thereafter be installed prior to the first use or completion of
the battery storage scheme hereby approved (whichever is the soonest) and
maintained throughout the lifetime of the development. 
Reason: To protect local residents from noise nuisance due to the use of the
development. 
13. Prior to the development commencing details of the operational site lighting
shall be submitted to and agreed in writing by the Planning Authority, in
consultation with the Environmental Health Manager. Thereafter, the agreed
lighting details shall be implemented as approved and maintained throughout
the lifetime of the development. 
Reason: To protect local residents from light nuisance due to the use of the
development. 
14. Prior to any development works commencing, a monitoring statement that
demonstrates the measures taken/implemented to ensure compliance with the
approved Community Wealth Building Plan (by AAH Consultants dated
November 2023) shall be submitted to the Council, as Planning Authority for
approval in writing. This shall include details of: 
• the offer of community ownership including any marketing/promotion with
the local community and community bodies;
• the name(s) of the body/bodies taking partial ownership and details of
their respective share(s) (where there has been no uptake this should also
be specified); 
• (where there has been no demand for community ownership) details of
alternative schemes as specified in section 2.20 of the approved
Community Wealth Building Plan including any marketing/promotion with
the local community and community bodies;  and
• mechanisms to ensure community bodies/groups that do invest can
withdraw from ownership if necessary. 
Thereafter the development shall proceed in accordance with the approved
details unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason: To ensure that the measures detailed in the approved Community
Wealth Building Statement have been implemented, in accordance with
Page 22

Page 23

National Planning Framework 4 Policy 11 – Energy and Policy 25 – Community
Wealth Building. 
15. All tree protection measures (i.e. herras fencing or equivalent) as shown in the
approved Planting Plan (ref no. Elgin GP-23-02 01 Rev B) shall be provided
prior to any development works commencing (including site
clearance/preparation works) and thereafter be retained in full accordance with
the approved details until completion of the development. 
Reason: To ensure timeous provision of the approved tree protection
measures. 
16. All landscaping as shown in the approved Planting Plan (ref no. Elgin GP-23-02
01 Rev B) shall be provided in the first planting season after completion of the
development or the first use of the battery storage scheme (whichever is the
soonest). Thereafter the landscaping (including existing trees on the site) shall
be maintained in accordance with the approved aftercare specified on the plan.
Any trees or plants which (during the lifetime of this consent) die, are removed
or become seriously damaged or diseased shall be replaced in the following
planting season with others of similar size, number and species unless this
Council (as Planning Authority) gives written consent to any variation of this
planning condition. 
Reason: In order to ensure that the approved landscaping works are timeously
carried out and properly maintained in a manner which will not adversely affect
the development or amenity and character of the area. 
17. The development hereby approved shall be implemented in full accordance
with section 6 (Conclusions and Recommendations) of the approved Bat
Activity Survey Report (ref: RDECO00060/180/01/B dated 9 June 2023) and
section 6 (Conclusions and Recommendations) of the approved Preliminary
Ecological Appraisal (ref: RDECO00060/173/01/B  dated 9 June 2023). 
Reason: In order to ensure that the development proceeds in accordance with
the recommended mitigation measures of the approved ecological surveys. 
18. All foul and surface water drainage proposals shall be in accordance with the
approved Drainage Impact Assessment, dated September 2023. 
Reason: To ensure that surface water drainage is provided timeously and
complies with the principles of SuDS; in order to protect the water environment. 
19. The Planning Authority shall be provided with reports every 3 years from the
date of first grid connection confirming that electricity has been imported and
exported to the grid. If no electricity has been imported or exported to the grid
by the development for a continuous period of 36 months, then unless
otherwise agreed in writing with the Planning Authority, the development shall
be removed and the site reinstated. Details of the proposed reinstatement shall
be submitted for approval in writing to the Planning Authority within 2 months of
either the equipment ceasing to be required or from the end of the 36 month
Page 23

Page 24

period when it is not in operation, and the reinstatement work shall be
completed within 3 months of the Planning Authority's approval of that
proposed reinstatement scheme, or such other period agreed in writing by the
Planning Authority. 
Reason: To ensure that if the Development becomes redundant the equipment
is removed from the site, in the interests of safety, amenity and environmental
protection. 
20. Prior to development commencing, a detailed plan addressing the procedures
and operations to tackle and extinguish a fire or other polluting incident at the
battery storage facility hereby approved must be submitted to and approved in
writing by the Council (as Planning Authority) in consultation with the Health
and Safety Executive, the Building Standards Section of Moray Council and the
Scottish Fire and Rescue Service. This plan must be incorporate the details
submitted under the latest version of the applicant’s Outline Safety
Management Plan dated October 2023. Thereafter the development shall be
operated in accordance with any recommendations contained in this plan. 
Reason: In order to ensure full consideration can be given to the suitability of
site for such a use, and to ensure that development has contingencies in place
to minimise damage or risk to human health. 
9. Planning Application 23/01227/AMC 
Ward 1 – Speyside Glenlivet 
Approval of Matters Specified in Conditions (1-32) of Planning Permission in
Principle (21/01901/EIA) in respect of proposed 85,000 tonnes per annum malt
production facility on land at Greens of Rothes, Rothes, Moray for Simpsons
Malt Ltd 
The Committee had before it a report by the Appointed Officer recommending that,
for reasons detailed in the report, planning permission be granted for an application
for the approval of Matters Specified in Conditions (1-32) of Planning Permission in
Principle (21/01901/EIA) in respect of proposed 85,000 tonnes per annum malt
production facility on land at Greens of Rothes, Rothes, Moray for Simpsons Malt
Ltd. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as the application relates to a previous major Planning
Permission in Principle (PPiP) that was considered as a departure from the
development plan at the time and thus subject to a statutory pre-determination
hearing. However, as this application is for Approval of Matters Conditioned
pertaining to that PPiP no further statutory pre-determination hearing is required. 
During his introduction, Mr Miller, Senior Planning Officer advised of an error on
page 103 of the report where the transportation informative refers to Speyside
Community Council when it should read a Local Community Group.  This was noted.
Page 24

Page 25

Following consideration, the Committee unanimously agreed to grant planning
permission in respect of Planning Application 23/01227/AMC subject to: 
• an amendment to the transportation informative to state a Local Community
Group rather than the Speyside Community Council; and
• the following conditions and reasons: 
1. In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 as amended, the development to which this permission relates must
be begun not later than whichever is the later of the following dates:-
(i)   the expiration of 3 years from the date of the grant of planning permission
in principal; or
(ii)   the expiration of 2 years from the final approval of the matters specified in
conditions or in the case of approval on different dates the final approval
of the last such matter to be approved. 
If the development has not commenced within this stated time-periods then this
permission shall lapse. 
Reason: The time limit condition is in accordance with section 59 of the Town
and Country Planning (Scotland) Act 1997 as amended. 
2. All landscaping including woodland planting as shown in the approved plans
(excluding that referred to in condition 4) shall be provided in the first planting
season following the first use or completion of the first phase of the
development (whichever is the soonest) and thereafter maintained in
accordance with the approved Landscape Management Plan. Any trees or
plants which (within a period of 5 years from the planting) die, are removed or
become seriously damaged or diseased shall be replaced in the following
planting season with others of similar size, number and species unless this
Council (as Planning Authority) gives written consent to any variation of this
planning condition. 
Reason: For the avoidance of doubt and to ensure timeous delivery of
landscaping. 
3. Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended, revoked or re-
enacted; with or without modification), no development other than that
permitted under this consent (including planning permission in principle ref.
21/01901/EIA) shall be undertaken within the area identified for safeguarding
on approved plan titled ‘SITE ACCESS JUNCTION, SAFE-GUARDED LAND
FOR FUTURE FOOTWAY PROVISION’ without the written consent of the
Council, as Planning Authority. 
Reason: To ensure the area identified for safeguarding is kept free of
development that may impede the future provision of a public path, in the
interests of providing infrastructure for sustainable and active travel. 
Page 25

Page 26

4. Notwithstanding the details submitted for the proposed landscaping (Drawing
No; L01 F ‘Planting Strategy’) which are not acceptable. No new planting (other
than grass) shall be permitted within the area identified as ‘SAFE-GUARDED
LAND FOR FUTURE FOOTWAY PROVISION’ on the plan titled ‘SITE
ACCESS JUNCTION, SAFE-GUARDED LAND FOR FUTURE FOOTWAY
PROVISION’ Until the following details have been submitted for approval in
writing by the Planning Authority in consultation with the Roads Authority: 
A detailed plan (Scale 1:500 min) showing the design of a continuous path
(minimum width 2m), proposed landscaping and planting. 
A maintenance schedule for the landscaping within the area of safeguarded
land. 
Thereafter, unless otherwise approved in writing by the Planning Authority, the
landscaping within the safe-guarded land shall be maintained with monthly
grass cutting or in accordance with the approved schedule for the lifetime of the
development. 
Reason: To ensure an acceptable development, safeguarding and
maintenance of land for future path provision for non-motorised users, and the
provision of additional details currently lacking from the submissions. 
5. No part of the development shall be completed or become operational until
evidence has been submitted to demonstrate that the statutory process to
promote and implement any new speed limit(s) on the B9015 required as a
consequence of the proposed development, have been completed by Moray
Council. 
Reason: To ensure an acceptable development through the provision of details
currently lacking and/or incorrectly shown on the submitted particulars to date. 
6. Notwithstanding the details submitted in the Site Traffic Management Plan. No
works shall commence on site until a Construction Traffic Management Plan
has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority. The Construction Traffic
Management Plan shall include the following information: 
a)   duration of works; 
b)   construction programme; 
Thereafter, the development shall be implemented in accordance with the
approved details. 
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site. 
7. The footway/footpath improvements between the development and Rothes
shall be provided in accordance with the approved details prior to the
completion of the development or the development becoming operational
(whichever is soonest). 
Page 26

Page 27

Reason: To ensure acceptable infrastructure is provided on route to the
development in road safety terms. 
8. Prior to completion of the site access or the access becoming operational a
visibility splay measuring 4.5m x 137m to the west and 4.5m x 215m to the east
shall be provided in accordance with the approved details. 
Thereafter the visibility splay shall be maintained at all times with no
obstructions over 0.26 metres in height measured from the nearest edge of the
carriageway, and in accordance with a schedule of maintenance to be agreed
in writing by the Council, as Planning Authority. 
Reason: To enable drivers of vehicles entering or exiting the site to have a
clear view so that they can undertake the manoeuvre safely and with the
minimum interference to the safety and free flow of traffic on the public road. 
9. No part of the development shall become operational until the parking and EV
charging associated with it has been provided in accordance with the approved
details. Thereafter, unless otherwise approved in writing by the Planning
Authority the parking shall be retained and available for use at all times for that
purpose. 
Reason: To ensure the permanent availability of parking and the provision of
infrastructure to support the use of low carbon transport in the interests of an
acceptable development and road safety. 
10. No boundary fences, hedges, walls or any other obstruction whatsoever over
1.0 metre in height and fronting onto the public road shall be within 2.4 metres
of the edge of the carriageway, measured from the level of the public
carriageway, unless otherwise agreed in writing by the Council, as Planning
Authority in consultation with the Roads Authority. 
Reason: To enable drivers of vehicles leaving driveways to have a clear view
over a length of road sufficient to allow safe exit, in the interests of road safety
for the proposed development and other road users. 
11. Prior to their siting, details (i.e. elevations, floor plans and any drainage
arrangements) of the proposed temporary portacabin offices as indicated on
the approved plans shall be submitted to and approved in writing by the Council
as Planning Authority along with timing for their provision and removal.
Thereafter the portacabins shall be provided in accordance with the approved
details unless otherwise agreed in writing with the Council (as Planning
Authority). 
Reason: To allow further consideration to be given to the temporary
portacabins, details of which are lacking from the submission, and to ensure
they are sited for a temporary period. 
12. The development hereby approved shall be finished and maintained in
Page 27

Page 28

accordance with the material finishes indicated on the approved plans, unless
otherwise agreed in writing with the Council. 
Reason: To ensure material finishes are provided in accordance with the
approved details, in the interests of the character and visual amenity of the
surrounding area. 
10. Planning Application 23/01906/APP 
Mr MacPherson, Principal Planning Officer, left the meeting at this juncture. 
Ward 4 – Fochabers Lhanbryde 
Domestic extension at 37 Beils Brae Urquhart Elgin Moray for Mr Neal
MacPherson 
The Committee had before it a report by the Appointed Officer recommending that,
for reasons detailed in the report, planning permission be granted for an application
for a domestic extension at 37 Beils Brae, Urquhart, Elgin, Moray for Mr Neal
MacPherson. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as it is submitted by an Officer that is involved in the
statutory planning process. 
Following consideration, the Committee unanimously agreed to grant planning
permission, as recommended, subject to the following conditions and reasons: 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act
1997 as amended. 
2. Two existing car parking spaces shall be retained within the site throughout the
lifetime of the development, unless otherwise agreed in writing with the Council
as Planning Authority. 
Reason: To ensure the permanent availability of the level of parking necessary
for
residents/visitors/others in the interests of an acceptable development and road
safety. 
3. No development shall commence until the tree protection measures detailed in
submitted Tree Protection Plan have been implemented in full.  For the
avoidance of doubt the tree protection barrier should comply with
BS5837:2012.
Page 28

Page 29

Reason: In order to ensure adequate measures to protect retained trees are in
place. 
Mr MacPherson, Principal Planning Officer re-joined the meeting at this juncture 
11. Proposal of Application Notice – 23/02061/PAN 
Under reference to paragraph 6 of the Minute of the meeting of this Committee dated
15 August 2023, the Committee had before it a report by the Depute Chief Executive
(Economy, Environment and Finance) informing that a Proposal of Application Notice
(PAN) had been submitted on 21 November 2023 on behalf of Moray Council. 
The Committee noted that a similar PAN had been considered by this Committee on
15 August 2023 however this updated PAN included student accommodation. 
Councillor Lawrence welcomed the proposed student accommodation and asked
that the Applicant give consideration to the provisional views/relevant issues raised
by the Committee on 15 August 2023 including active travel considerations. 
Thereafter, the Committee unanimously agreed: 
(i) to note the terms of the report and asked that the following provisional
views/relevant issues be recorded and forwarded to the Applicant in order to
inform the development of their proposed formal application for planning
permission: 
• that the Applicant give consideration to the provisional views/relevant
issues raised by the Committee on 15 August 2023 including active travel
considerations; and 
(ii) that the matters raised by the Committee also be forwarded to consultees likely
to be involved in any formal application for planning permission for the proposal. 
12. Planning Performance Framework 2022-23 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing that the Planning Performance Framework
(PPF) for 2022/23 had been submitted to the Scottish Government (SG) on 27 July
2023, covering the period from 1 April 2022 to 31 March 2023.  The report provided
a summary of feedback received from the Scottish Government dated 20 October
2023 with specific reference to the Performance Markers Report and Red, Amber,
Greed (RAG) ratings for the 2022/2023 submission. 
The Committee joined the Chair in congratulating the Planning Service for the
outstanding performance set out in the report and thereafter unanimously agreed to: 
Page 29

Page 30

(i) note the Planning Performance Framework submitted to the Scottish
Government on 27 July 2023 as set out in Appendix 1 of the report; 
(ii) note the feedback report received from the Scottish Government on 20
October 2023 as set out in Appendix 2 of the report; 
(iii) authorise the Head of Economic Growth and Development to submit the
Planning Performance Framework for 2023/2024 to the Scottish Government
by the end of July 2024 (or any other date that may be set); 
(iv) note that the Planning Performance Framework will be reported to the first
available Planning and Regulatory Services Committee following receipt of
the feedback; and 
(v) note the Planning Performance Framework 2022/23 will be circulated to all
developers, stakeholders and internal services seeking comment/feedback to
assist with continuous improvement to be fed back into the PPF for 2023/2024 
13. Review of Enforcement Charter and Update on Enforcement 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking it to agree the revised Enforcement Charter and
note the update on Planning Enforcement activity. 
Following consideration, the Committee unanimously agreed: 
(i) to note the contents of the report; and 
(ii) the updated Enforcement Charter as set out in Appendix 1 of the report. 
14. Planning Policy Guidance – Moray Local Development Plan 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking for approval of the stance taken on the National
Planning Framework 4 (NPF4) policy 8 Green Belts and the updated planning policy
guidance on NPF4 policy 17 Rural Homes to support the delivery of the Moray Local
Development Plan. 
Following consideration, the Committee unanimously agreed: 
(i) that NPF4 policy 8 Green Belts is not applicable within the Moray Local
Development Plan boundary for the reasons set out in the report; 
(ii) to approve the updated planning policy guidance for policy 17 Rural Homes
as set out in Appendix 1 of the report and agreed that this be used as a
material consideration in the development management process; and 
Page 30

Page 31

(iii) that the policy stance on NPF4 policy 8 and the updated planning policy
guidance on policy 17 Rural Homes is used to inform the development of the
new Local Development Plan. 
15. Development Plan Scheme 2024 – Moray Local Development Plan 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking for consideration of the current timetable for the
preparation of the new Local Development Plan (LDP) 2027 and agreement for the
submission of the Development Plan Scheme (DPS) and Participation Statement to
the Scottish Government. 
During her introduction, Ms Webster advised that a graphic on engagement had
been omitted in error from the Participation Statement and that this would be
circulated to the Committee prior to being submitted the Scottish Government. 
Following consideration, the Committee unanimously agreed that the DPS and
Participation Statement for 2024, as set out in Appendix 1 of the report, and the
Scheme be submitted to the Scottish Government, with the inclusion of the graphic
on engagement. 
16. Keith Green Energy and Infrastructure Framework 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking it to note the representations received to the draft
Keith Green Energy and Infrastructure Framework and agree the Council’s response
to these and approve the final Framework. 
Following consideration, the Committee unanimously agreed to: 
(i) note the representations received to the public consultation on the draft Keith
Green Energy and Infrastructure Framework and agreed the Council’s
response to these, as set out in Section 4 of the report; and 
(ii) approve the final Keith Green Energy and Infrastructure Framework, as set
out in Appendix 1 of the report, and agreed that this be used as a material
consideration in the development management process and to inform the
development of the new Local Development Plan. 
17. Tree Preservation Orders 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking it to confirm the revocation of Tree Preservation
Orders (TPOs) at Cowie Avenue/Fife Street (Dufftown) and Deskford, without
modification. 
Following consideration, the Committee unanimously agreed to:
Page 31

Page 32

(i) note the representation received in response to the Moray Council (Cowie
Avenue/Fife Street, Dufftown) Revocation of Tree Preservation Order 2023,
as summarised in Para 4.1 of the report; 
(ii) confirm, without modification, Moray Council (Cowie Avenue/Fife Street,
Dufftown) Revocation of Tree Preservation Order 2023; and 
(iii) confirm, without modification, Moray Council (Groups of Trees at Deskford,
Buckie) Revocation of Tree Preservation Order 2023. 
18. Food Law Enforcement Service Delivery Plan 2023-24 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking for approval of the Food Law Enforcement Service
Delivery Plan 2023/2024. 
Following consideration, the Committee unanimously agreed to approve the Food
Law Enforcement Service Delivery Plan 2023/2024. 
19. Question Time 
Under reference to paragraph 4 of the Minute of this Committee dated 24 October
2023, Councillor Macrae queried whether further discussion had taken place with the
Applicant in relation to the most appropriate access to the development. 
In response, the Head of Economic Growth and Development advised that a meeting
had taken place with Officers and the Applicant, a solution had been achieved and
that a new application had recently been submitted. 
Councillor Coull queried whether members of the Council could have training on
National Planning Framework (NPF) 4. 
In response, the Head of Economic Growth and Development agreed to arrange
training for Members in relation to NPF4 and how it fits with the Moray Local
Development Plan 2020. 
20. Unauthorised Development at Residential Property in Tomintoul [Para12] 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing of a breach of a planning condition regarding
the erection of an unauthorised fence causing a road safety hazard by obstructing a
visibility splay at a road junction. 
During his introduction, Mr MacPherson advised that, due to a recently submitted
planning application to regulate the fence, a change to recommendation (i) had been
circulated to the Committee prior to the meeting.  This was noted.
Page 32

Page 33

Following consideration, the Committee unanimously agreed: 
(i) in the event the recently submitted planning application is either refused, or
the proprietor refuses to down-take/reposition their fence, officers are
authorised to issue Planning Enforcement Notice under Section 127 of the
Town and Country Planning (Scotland) Act 1997; the Enforcement Notice will
require the owner of the property to remove or lower the unauthorised fence;
and 
(ii) should the Notice not be complied with then authority is given to take direct
action to remove or lower the fence. 
Page 33

Page 34

Page 34

Page 35

MORAY COUNCIL 
MINUTE OF THE SPECIAL MEETING OF THE PLANNING AND REGULATORY
SERVICES COMMITTEE 
15 FEBRUARY 2024 
COUNCIL CHAMBERS, ELGIN 
PRESENT 
Councillor Cowe, Councillor Divers, Councillor Dunbar, Councillor Fernandes,
Councillor Gatt, Councillor Gordon, Councillor Keith, Councillor Lawrence, Councillor
Macrae, Councillor McBain, Councillor van der Horn, Councillor Warren 
APOLOGIES 
Councillor Cameron, Councillor Coull 
IN ATTENDANCE 
Head of Economic Growth and Development, Development Management and
Building Standards Manager, Mr N MacPherson, Principal Planning Officer, Mr R
Smith, Principal Planning Officer, Mrs L MacDonald, Senior Planning Officer, Legal
Services Manager and Mrs L Rowan, Committee Services Officer as Clerk to the
Committee. 
1. CHAIR 
Councillor Gordon, being Chair of the Planning and Regulatory Services Committee,
chaired the meeting. 
2. DECLARATION OF GROUP DECISIONS AND MEMBER’S INTERESTS 
In terms of Standing Orders 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda. 
Councillor Divers declared an interest in Item 5 “Planning Application 23/02157/APP”
as his son is employed by the Applicant, and stated that the would leave the
chamber during discussion of this item and take no part in the decision. 
There were no further declarations of Members interests in respect of any item on
the agenda. 
3. EXEMPT INFORMATION 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting during consideration of the items of business
Item 3b.
Page 35

Page 36

appearing at the relevant paragraphs of this minute as specified below, so as to
avoid disclosure of exempt information of the class described in the appropriate
paragraphs of Part 1 of Schedule 7A of the Act. 
Minute
Paragraph 
Paragraph Number of Schedule 7A
8 12 - Information relating to instructions to counsel any opinion of
counsel and any advice received, information obtained or action
to be taken in connection with any legal proceedings 
4. PLANNING APPLICATION 23/01165/APP 
Ward 1 – Speyside Glenlivet 
S42 to vary condition 3 and condition 20 of the original planning consent ref
21/00020/EIA at Garbet Windfarm Site, 5.5km Southeast of Dufftown, Moray for
Energiekontor 
A report was submitted by the Appointed Officer recommending that, for reasons
detailed in the report, planning permission be granted for a S42 to vary condition 3
and condition 20 of the original planning consent ref 21/00020/EIA at Garbet
Windfarm Site, 5.5km Southeast of Dufftown, Moray for Energiekontor. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as the application is a major planning application. 
The Chair confirmed that the monument erected in memory of Dr Grant who made
the hill track adjacent to the new track leading to the windfarm will be preserved and
will not be removed. 
Following consideration, the Committee unanimously agreed to grant planning
permission, as recommended, in respect of Planning Application 23/01165/APP
subject to the following conditions and reasons: 
Other than in relation to conditions 3 and 20, all other conditions referring to the ‘EIA
report’, related to Environment Impact Assessment documents submitted and
approved in relation to the consent permitted under DPEA reference PPA-300-2066
determined on 26 September 2022. In relation to variation sought, the Ministry of
Defence have sought two further conditions (30 & 31). 
1. Length of planning permission
Unless otherwise agreed in writing with the planning authority, the permission
hereby granted shall endure for a period no longer than 35 years from the date
of final commissioning, after which the development shall cease to export
electricity to the national grid, and shall be decommissioned in accordance with
the details otherwise approved elsewhere within this planning permission. The
date of final commissioning shall be as informed to the planning authority in
writing or 18 months from the date of this planning permission, whichever is the
sooner. 
Page 36

Page 37

Reason: to avoid uncertainty and ensure that the permission is implemented
within a reasonable period, and to allow the planning authority to monitor
compliance with the other conditions imposed. 
2. Expiry of planning permission
This planning permission will lapse on the expiration of a period of five years
from the date of this planning permission, unless the development has been
started within that period. 
Reason: to apply a reasonable time limit for the implementation of the planning
permission. 
3. Height of Turbines
For the avoidance of doubt, the maximum height of the turbines hereby
approved is 200 metres to blade tip. 
Reason: to ensure that the development is carried out in accordance with the
approved details. 
4. Turbine details
No turbines shall be erected on the site until the definitive type/model of all
turbines including details of the hub height, blade length and blade tip height,
external finishes and colour, together with any further assessments as may be
required in order to demonstrate to the reasonable satisfaction of the planning
authority that the turbines conform to the impacts of the candidate turbine
assessed in the EIA report, have been submitted to and approved in writing by
the planning authority. The approved details shall be implemented.
Furthermore:-
a)  all wind turbine blades shall rotate in the same direction; 
b)  no part of the development shall display any name, logo, sign or other
advertisement other than as specified in the application, unless approved
in advance in writing by the planning authority or if required by law; and 
c)  the wind turbines shall be constructed and operated in accordance with
the approved details and shall be maintained in the approved colour, free
from external rust, staining or discolouration, until such time as the
development is decommissioned. 
Reason: to ensure that the environmental impacts of the turbines forming part
of the development conform to the impacts of the candidate turbine assessed in
the EIA report and in the interests of the visual amenity of the area. 
5. Substation
No construction of the substation or compound shall commence until final
details of the external appearance, dimensions, surface materials and boundary
treatment of each, including the means of foul water disposal and water supply
have been submitted to and approved in writing by the planning authority. The
sub-station and compound (including associated infrastructure) shall thereafter
be constructed in accordance with the approved details. 
Reason: to ensure that the environmental impacts of the sub-station and the
compound forming part of the development conform to the impacts assessed in
the EIA report and in the interests of visual amenity. 
6. Battery Storage facility
Page 37

Page 38

No construction of the battery storage facility shall commence until final details
of its external appearance, dimensions, surface materials and boundary
treatment, including the means of foul water disposal and water supply have
been submitted to and approved in writing by the planning authority. The
battery storage facility (including associated infrastructure) shall be constructed
in accordance with the approved details. 
Reason: to ensure that the environmental impacts of the battery storage facility
forming part of the development conform to the impacts assessed in the EIA
report and in the interests of visual amenity. 
7. Transportation
Prior to the commencement of any part of the development, the following must
be submitted to and approved in writing by the planning authority in
consultation with the roads authority:
a)  detailed proposals for undertaking trial runs and also delivery of abnormal
indivisible loads. Details must include, measures proposed to protect the
public road and structures, traffic management (including temporary
waiting restrictions), vehicle holding areas and non-vehicular management
during deliveries, time restrictions for deliveries i.e. outwith school arrival
and departure times. 
b)  evidence that a construction traffic management plan (CTMP) has been
completed and signed by both the developer and the roads authority. The
CTMP must cover the duration of the development and include methods
of dealing with large and abnormal delivery vehicles. The plan shall also
include the methods of marshalling and manoeuvring at junctions on the
public road network, any temporary traffic waiting restriction requirements,
all modifications to the road network and traffic management
arrangements, routes for deliveries to and from the site, and routes which
must not be used by development traffic (construction or staff) to access
the site. A programme of monitoring for all routes identified in the CTMP
during construction will be required. 
c)  evidence that a wear and tear agreement between the developer and the
roads authority has been completed and signed by both parties. The wear
and tear agreement must include a condition survey of the network
undertaken jointly by the developer and a representative from the roads
authority. The survey must include the full extent of the agreed
construction traffic route(s) (within Moray) between the site and the ‘A’
class road network. In addition, the wear and tear agreement shall also
include condition surveys of all roads identified as ‘unsuitable’ which must
be agreed with the roads authority. 
d)  evidence shall be provided to confirm that a bond or other financial
security has been agreed by the developer and the roads authority and
put in place to cover the construction period of the development and to be
called upon in the event that the developer fails to meet its obligations
under the wear and tear agreement to maintain the road in a safe
condition during the construction phase of the development and to restore
the road to its original predevelopment condition within 1 year of the
completion of construction or the development becoming operational,
whichever is the earlier. The bond/security shall relate to the full extent of
the U94bH Burnside of Markie Road within the Moray Council area and is
required to mitigate the potential risks from damage to the public road
occurring during the construction phase of the development. 
Page 38

Page 39

e)  detailed plans (1:200 minimum) of all temporary and permanent works
proposed to the public roads including details of any works required to
listed structures and any other heritage assets affected by deliveries to
the development. Details for any areas of road widening and new passing
places must also include drainage details to accommodate the additional
road surface area. Specific trees to be removed to accommodate the road
widening and passing places on the public road network leading to the
site should also be identified. Details of where an equivalent number will
be planted should also be included. 
f)  detailed plans (1:200 minimum) of all works to accommodate the
proposed abnormal indivisible deliveries. Details for any areas of road
widening and new passing places must also include drainage details to
accommodate the additional road surface area. Specific trees to be
removed to accommodate the road widening and passing places on the
public road network leading to the site should also be identified. Details of
where an equivalent number will be planted should also be included. 
Thereafter, the development shall be completed in accordance with the
approved details and plans. 
Reason: to ensure that the development is acceptable in road safety terms and
to mitigate the environmental impact. 
8. Road works
Prior to the commencement of construction and deliveries, including any
abnormal indivisible loads, all suspensive works approved through condition 7
must be completed in accordance with the approved details and plans. Any
works undertaken are to be permanent for the duration of the operation of the
development unless otherwise agreed in writing with the planning authority in
consultation with the roads authority. 
On completion of the works but prior to the commencement of deliveries,
including any abnormal indivisible loads, abnormal load trial run(s) must be
undertaken to confirm the works are acceptable and to identify any other
restrictions not previously addressed and the frequency and location of
abnormal load passing places/oncoming vehicle holding areas required.
Representatives from Moray Council Transportation (Traffic), Aberdeenshire
Council and Police Scotland must be invited to the trial run. Thereafter, the
development shall be completed in accordance with the approved details and
plans. 
Reason: to ensure that acceptable infrastructure is provided on the route
to/from the development in the interests of road safety. 
9. Temporary over-run areas
Prior to completion of the development, all areas of temporary over-run must be
reinstated to an appropriate standard. 
Reason: to ensure restoration at the end of the construction period to mitigate
the environmental impact. 
10. Environmental Clerk of Works
a)  No development shall commence until the planning authority has, in
consultation with NatureScot, approved in writing the terms of the
Page 39

Page 40

appointment of an independent environmental clerk of works (ECoW). The
terms of appointment shall:
i. impose a duty to monitor compliance with the mitigation identified in
chapter 15 Schedule of Mitigation of volume I of the EIA Report; the
construction environmental management plan; and the habitat
management plan; 
ii. require the ECoW to report to the developer’s nominated
construction project manager and the planning authority any
incidences of noncompliance with the mitigation measures referred
to at i) above at the earliest practical opportunity; 
iii. require the ECoW to direct the micro-siting and placement of the
turbines, buildings, tracks, hardstanding, and other ancillary
infrastructure in accordance with the micro-siting condition; 
iv. require the ECoW to submit a monthly report to the planning
authority summarising works undertaken on site and incidents of
micro siting; 
v. require the ECoW to advise on adequate protection of nature
conservation interests on the site and be responsible for checks for
protected species before and during construction; and 
vi. require the ECoW to attend frequent meetings as set out in the
habitat management plan. 
b)  The ECoW shall be appointed on the approved terms prior to the
commencement of development, throughout any period of construction
activity and during any period of post construction restoration works. 
Reason: to secure effective monitoring of and compliance with the
environmental mitigation and management measures associated with the
development. 
11. Environmental Clerk of Works (Decommissioning)
No later than six months prior to decommissioning of the development or the
expiration of this permission (whichever is the earlier), details of the terms of
appointment of an independent environmental clerk of works throughout the
decommissioning, restoration and aftercare phases of the development shall be
submitted in writing to the planning authority for approval in writing. The
environmental clerk of works shall be appointed on the approved terms
throughout the decommissioning, restoration and aftercare phases of the
development. 
Reason: to secure effective compliance with the environmental mitigation and
management measures associated with the development during
decommissioning. 
12. Habitat Management Plan 
Prior to the commencement of development and further to the mitigation and
enhancement contained within the outline habitat management plan hereby
approved, a consolidated and detailed habitat management plan must be
submitted to the planning authority for approval in writing, incorporating:- 
a)  the constitution of the habitat management plan steering group, including
as a minimum the developer, the landowner, NatureScot, and the
Deveron, Bogie and Isla Rivers Trust; 
b)  the remit of the habitat management plan steering group including how
changes to the plan will be made and approved; 
Page 40

Page 41

c)  a fishery management plan including additional baseline electrofishing
and kick sampling to be conducted before, during and two years post
construction; 
d)  frequent site meetings with the ECoW appointed in accordance with
condition 10 preconstruction, during and on completion of construction; 
e)  consolidation of the proposed ornithological mitigation with existing agri-
environmental management schemes already in place particularly in
relation to wading birds and peatland restoration; 
f)  further investigation and implementation of measures to reduce the
required excavation in construction of crane hardstandings. This may be
by adoption of alternative construction methods or other means; 
g)  the construction programme duration which is likely to be 12 to 18
months; 
h)  a peat management plan including details of alternatives to stripping the
shallow peaty layer in the temporary construction compound; active
intervention measures to promote swift revegetation including details of
the slope and how the hydrology of the reinstated peat will be addressed
and monitored; water table depth and resulting soil pore space saturation
which will require monitoring and active intervention if the water table is
lower than required; and 
i)  blanket bog restoration: further details of location, methods, materials,
monitoring and aftercare in relation to blanket bog restoration required. 
Thereafter, the development shall be completed in accordance with the
approved details. No development shall commence unless and until the habitat
management plan steering group has been established. 
Reason: to minimise potential impacts on fish fauna, birds and peat and to
ensure the appropriate management of peat habitats and reuse of peat. 
13. Drainage
Unless otherwise agreed with the planning authority in writing, a finalised
drainage impact assessment, showing the following must be submitted to and
approved in writing by the planning authority (in consultation with Moray Flood
Risk Management Team) prior to completion of all water crossing and turbine
foundation pads. The drainage impact assessment should be based upon the
designed drainage mitigation contained in Chapters 8 and 15 of volume I of the
EIA report and detail the following: 
a)  plans submitted with the definitive track and turbine pad layout of the
drainage system for both the construction phase and the final site layout
once micro-siting allowances have been made; 
b)  the drainage system should be designed to a 1:30 year return period
(including 35% climate change), without surcharging, if attenuation is used
the system must drain completely within 24 hours; 
c)  demonstrate that the post development run-off rate does not exceed the
predevelopment run-off rate, or increase the risk of flooding to the
surrounding land; 
d)  confirm that drainage is not redirected to allow surface water draining from
one catchment to drain into a different catchment either at construction
phase or completion; 
e)  instead of the culverts shown in Figure 3.5 ‘Typical Watercourse Crossing’
of the EIA report, watercourse crossings to be oversized, bottomless
arched culverts or traditional style bridges are to be used; and 
Page 41

Page 42

f)  the Deveron District Salmon Fishery Board are be consulted on any
instream works before work progresses and specifically on the design of
all waterway crossings. 
Reason: to ensure all the necessary flood prevention measures are in place
and to ensure that protection of the water environment is maintained throughout
the construction, operation and decommissioning of the development. 
14. Access Management Plan
Prior to commencement of development an access management plan must be
submitted to and approved in writing by the planning authority in consultation
with the Moray Access Manager and the Moray Local Outdoor Access Forum.
Thereafter the approved access management plan shall be adhered to and
implemented within the timescales set out. 
Reason: to ensure that public access is secured throughout the life of the
development. 
15. Construction Environmental Management Plan
No development shall commence until a construction environmental
management plan, incorporating a construction method statement and the
proposed precautions and mitigation detailed in chapter 15 Schedule of
Mitigation Table 15.1 of volume I of the EIA report, has been submitted to and
approved in writing by the planning authority in consultation with the Scottish
Environment Protection Agency. 
Reason: to ensure all the necessary mitigation measures as set out in the EIA
Report are implemented properly. 
16. Construction Hours
a)  Construction work shall only take place on the site between the hours of
0700 to 1800 on Monday to Friday inclusive and 0700 to 1300 on
Saturdays, with no construction work taking place on a Sunday or on
national public holidays or bank holidays. Outwith these specified hours,
development on the site shall be limited to concrete pouring if started
within those hours, turbine erection, maintenance, emergency works, dust
suppression, and the testing of plant and equipment, unless otherwise
approved in advance in writing by the planning authority. The developer
shall notify the planning authority of such works if carried out outside the
permitted hours within two working days of their occurrence. 
b)  Heavy Goods Vehicles (HGV) movements to and from the site (excluding
abnormal loads) during construction of the wind farm shall be limited to
0700 to 1900 Monday to Friday, and 0700 to 1600 on Saturdays, with no
HGV movements to or from site taking place on a Sunday or on national
public holidays or bank holidays unless otherwise agreed in writing by the
planning authority. 
c)  Turbine delivery may be made out with these construction hours, where
necessary, and as agreed in writing in advance with the planning
authority. For the avoidance of doubt the public holidays or bank holidays
are detailed as follows: 
•  New Year's Day, if it is not a Sunday or, if it is a Sunday, 3rd
January; 
•  2nd January, if it is not a Sunday or, if it is a Sunday, 3rd January; 
•  Good Friday; 
Page 42

Page 43

•  The first Monday in May; 
•  The first Monday in August; 
•  30th November, if it is not a Saturday or Sunday or, if it is a Saturday
or Sunday, the first Monday following that day; 
•  Christmas Day, if it is not a Sunday or if it is a Sunday, 27th
December; and 
•  Boxing Day, if it is not a Sunday or, if it is a Sunday, the 27th
December. 
Reason: to ensure that construction activity minimises the impact on
surrounding neighbours. 
17. Wind Farm Noise
The rating level of noise immissions from the combined effects of the wind
turbines hereby permitted (including the application of any tonal penalty and
amplitude modulation (AM) penalty), when determined in accordance with the
attached guidance notes, shall not exceed the values for the relevant integer
wind speed set out in or derived from Table 1 attached to these conditions and:
a)  within 21 days from receipt of a written request of the planning authority,
following a complaint to it alleging noise disturbance at a dwelling, the
wind farm operator shall, at its expense, employ an independent
consultant and provide a written protocol to be approved by the planning
authority. The protocol shall describe the procedure to assess the level
and character of noise immissions from the wind farm at the complainant's
property in accordance with the procedures described in the attached
guidance notes. The written request from the planning authority shall set
out as far as possible the time or meteorological conditions to which the
complaint relates and time or conditions relating to tonal noise or AM if
applicable. - Measurements to assess compliance with the noise limits
shall be undertaken in accordance with the assessment protocol which
shall be approved in writing by the planning authority. 
b)  the wind farm operator shall provide to the planning authority the
independent consultant's assessment of the rating level of noise
immissions undertaken in accordance with the protocol within two months
of the date of the approval of the protocol by the local authority unless
otherwise agreed by the planning authority. The assessment shall include
all data collected for the purposes of undertaking the compliance
measurements and analysis, such data to be provided in a format to be
agreed with the planning authority. Certificates of calibration of the
equipment shall be submitted to the planning authority with the report. 
c)  where a further assessment of the rating level of noise immissions from
the wind farm is required pursuant to Guidance Note 5 of the attached
Guidance Notes, the wind farm operator shall submit a copy of the further
assessment within 21 days of submission of the independent consultant's
initial assessment unless otherwise agreed by the Planning Authority. 
Table 1: At all times – Noise limits expressed in dB LA90, 10 minute and apply
for standardised 10 m height wind speeds up to 10 m/s as determined within
the site averaged over 10 minute periods. 
Location
Standardised Wind Speed at 10m height in
m/s averaged over 10 minute periods,
Sound Pressure Levels in dB, LA90 10min 
Property Name 4 5 6 7 8 9 10 11 12
Page 43

Page 44

H1 Easter Braetown 25 30 32 32 32 32 32 32 32
H2 Wester Braetown 25 30 32 32 32 32 32 32 32
H3 Dumeath 16 21 23 23 23 23 23 23 23
H4 Backside Farm 21 26 28 28 28 28 28 28 28
H5 Ballochford 17 22 24 24 24 24 24 24 24
H6 Bellcherrie 20 25 27 27 27 27 27 27 27 
Table 2: Coordinate locations of the dwelling listed in Table 1. 
LOCATION  Easting Northing
Easter Braetown 339688 839028
Wester Braetown 339423 838865
Dumeath 342236 837129
Backside Farm 341085 836165
Ballochford 336007 833656
Bellcherrie 340060 834097 
Note to Table 2: The geographical coordinate references are provided for the
purpose of identifying the general location of the dwelling to which the noise
limits apply. 
Guidance notes for noise condition
These notes are to be read with and form part of the planning condition on
noise. The measured data is to be split into bins as described below. The rating
level in each bin is the arithmetic sum of the wind farm noise level, any tonal
penalty applied in accordance with Note 3 and any AM penalty applied in
accordance with Note 4. Reference to ETSU-R-97 refers to the publication
entitled "The Assessment and Rating of Noise from Wind Farms" (1997)
published by the Energy Technology Support unit (ETSU) for the Department of
Trade and Industry (DTI). IOAGPG is “A Good Practice Guide to the Application
of ETSU-R-97 for the Assessment and Rating of Wind Turbine Noise” or any
update of that report current at the time of measurement. The IOA Metric is “A
Method for Rating Amplitude Modulation in Wind Turbine Noise” dated 9th
August 2016 or any update of that current at the time of measurement. 
Note 1 – Data collection
a)  Values of the LA90,10-minute noise index should be measured in
accordance with the IOAGPG. Measurements shall be undertaken in such
a manner to enable a tonal penalty to be calculated and to allow an AM
penalty to be calculated for selected periods where a tonal or AM
assessment is required. 
b)  To enable compliance with the conditions to be evaluated, the wind farm
operator shall continuously log arithmetic mean wind speed in metres per
second (m/s) and mean wind direction in degrees from north in each
successive 10-minutes period in a manner to be agreed in writing with the
planning authority. The wind speed at turbine hub height shall be
“standardised” to a reference height of 10 metres as described in ETSU-
R-97 at page 120 using a reference roughness length of 0.05 metres. It is
this standardised 10 metre height wind speed data which are correlated
with the noise measurements determined as valid. The wind farm operator
shall continuously log arithmetic mean nacelle anemometer wind speed,
mean nacelle orientation, mean wind direction as measured at the
nacelle, arithmetic mean rotor RPM and whether each wind turbine is
running normally during each successive 10-minutes period for each wind
Page 44

Page 45

turbine on the wind farm. All 10- minute periods shall commence on the
hour and in 10-minute increments thereafter synchronised with Universal
Time (UT). 
Note 2 – Data analysis
a)  The independent consultant shall identify a sub set of data having had
regard to:- 
•  the conditions (including time of day and corresponding wind
directions and speeds) at times in which complaints were recorded; 
•  the nature/description recorded in the complaints if available; 
• information contained in the written request from the local planning
authority; 
•  likely propagation effects (downwind conditions or otherwise); and
•  the results of the tonality/AM analysis where relevant. In cases
where it is possible to identify patterns of clearly different conditions
in which complaints have arisen additional sub sets may be
considered provided this does not introduce unreasonable
complexity in the analysis and can be justified by the independent
consultant. 
b) Within each of the sub set(s) of data identified, data shall be placed into
separate 1 m/s wide wind speed bins. 
Note 3 – Tonal penalty
a)  Where, in accordance with the protocol, the noise contains or is likely to
contain a tonal component, a tonal audibility shall be calculated for each
ten-minute period using the following procedure. 
b)  For each 10-minute period for which a tonal assessment is required this
shall be performed on noise immissions during two minutes of each 10-
minute period. The two minute periods should be spaced at 10-minute
intervals provided that uninterrupted uncorrupted data are available ("the
standard procedure"). 
c)  For each of the two-minute samples the tone level above audibility shall
be calculated by comparison with the audibility criterion given in Section
2.1 on pages 104 -109 of ETSU-R-97. Samples for which the tones were
below the audibility criterion or no tone was identified, a value of zero
audibility shall be substituted. Where data for a ten-minute period are
corrupted, that period shall be removed from the tonal analysis. 
d)  The tone level above audibility for each 10-minute period shall be placed
in the appropriate data sub set and wind speed bin. 
Note 4 – AM penalty
a) Where, in accordance with the protocol, the noise contains or is likely to
contain AM, an AM penalty shall be calculated for each ten-minute period
using the following procedure. 
b) For each 10-minute interval for which an AM assessment is required this
shall be performed in accordance with the IOA Metric. The value of AM for
each ten-minute period shall be converted to a penalty in decibels in
accordance with the graph below and the penalty shall be placed in the
appropriate data sub set and wind speed bin. Where a penalty is zero it
should be placed in the bin in the same way. 
Page 45

Page 46

Note 5 – Calculation of rating level
a) The LA90 sound pressure level for each data sub set and wind speed bin
is the arithmetic mean of all the 10 minute sound pressure levels within
that data sub set and wind speed bin except where data has been
excluded for reasons which should be clearly identified by the
independent consultant. The tonal penalty for each bin is the arithmetic
mean of the separate 10 minute tonal audibility levels in the bin converted
to a penalty in accordance with Fig 17 on page 104 of ETSU-R-97. The
AM penalty for each bin is the arithmetic mean of the AM penalties in the
bin. - The assessment level in each bin is normally the arithmetic sum of
the bin LA90, the bin tonal penalty and the bin AM penalty except where
the AM penalty and the tonal penalty relate to the same characteristic
(e.g. amplitude modulated tones) when the sum of both penalties may
overly penalise the characteristics of the noise. Such cases should be
identified and only the larger of the AM or tonal penalty should be applied. 
b) If the assessment level in every bin lies at or below the values set out in
the table(s) attached to the conditions then no further action is necessary.
In the event that the assessment level is above the limit(s) set out in the
tables attached to the noise conditions in any bin, the independent
consultant shall undertake a further assessment of the rating level to
correct for background noise so that the rating level relates to wind turbine
noise immission only. Correction for background noise need only be
undertaken for those wind speed bins where the assessment level is
above the limit. 
c)  The wind farm operator shall ensure that all the wind turbines in the
development are turned off for such periods as the independent
consultant requires to undertake the further assessment. The further
assessment shall be undertaken in accordance with the following steps: 
i. Repeating the steps in Note 1, with the wind farm switched off, and
determining the background noise (L3) in each bin as required in the
protocol. At the discretion of the consultant and provided there is no
reason to believe background noise would vary with wind direction,
background noise in bins where there is insufficient data can be
assumed to be the same as that in other bins at the same wind
speed. 
Page 46

Page 47

 10/10/
1
32 1010log10 LLL −=
ii.  The wind farm noise (L1) in each bin shall then be calculated as
follows where L2 6 5 4 a:, "'0 i 3 ,., C II CL 2 1 0 0 1 2 3 4 5 6 7 8 9
10 11 12 13 AM rating (IOA method, dB) is the measured level with
turbines running but without the addition of any tonal nor AM penalty: 
iii.  The rating level shall be calculated by adding the tonal and AM
penalties to the derived wind farm noise L1 in that bin. 
iv.  If the rating level after adjustment for background noise contribution
and adjustment for tonal and AM penalties in every bin lies at or
below the values set out in the Tables attached to the condition at all
wind speeds then no further action is necessary. If the rating level at
any integer wind speed exceeds the values set out in the Table(s)
attached to the condition then the development fails to comply with
the planning condition in the circumstances represented by that bin. 
Reason: to ensure noise emanating from the windfarm, including amplitude
modulation should it occur, can be controlled and kept to an acceptable level. 
18. Noise measurements
Prior to the commencement of development full details of the proposed wind
turbines (including the power rating, sound power levels, and tonality
assessment carried out on the selected turbine) shall be submitted to and
approved by the planning authority. Thereafter only the approved turbines can
be erected on the site unless with the written consent of the planning authority. 
An independent consultant, approved by the planning authority, shall be
employed to measure and where necessary calculate, at the developer’s
expense, the level of noise emissions from the wind turbines within the first year
of operation. The measurement procedures, which may include filtering data
according to wind direction, shall be agreed with the planning authority prior to
commencement of operation. The measurements shall be carried out in
accordance with the approved procedures. The results of any measurement
exercise shall be forwarded to the planning authority as soon as practicable after
the completion of the monitoring exercise. 
Reason: to ensure adequate noise data is collected to aid future safeguard to
neighbouring properties for noise amenity. 
19.  Borrow Pit Conditions
i.  Prior to the commencing of any blasting operations for the formation of
borrow pits associated with the development, a scheme for the monitoring
of blasting including the location of monitoring points and equipment to be
used shall be submitted to the planning authority for written approval. All
blasting operations shall take place only in accordance with the scheme
as approved or with subsequent amendments as may be approved in
writing by the planning authority. 
ii.  In the event of the formation of borrow pits, blasting times shall be
restricted as follows: 
Page 47

Page 48

a)  No blasting shall be carried out on the site except between the
following times (1000 and 1200 hours) and (1400 and 1600 hours)
on Mondays to Fridays and (1000 and 1200 hours) on Saturdays. 
b)  There shall be no blasting or drilling operations on Sundays, national
public holidays or bank holidays (as defined in condition 16).
c)  The above requirement shall not apply in cases of emergency when
it is considered necessary to carry out blasting operations in the
interests of safety. The planning authority shall be notified in writing
immediately of the nature and circumstances of any such event. 
iii. Ground vibration as a result of blasting operations to form borrow pits at
the site shall not exceed a peak particle velocity of 6mms-1 in 95% of all
blasts and no individual blast shall exceed a peak particle velocity of
12mms-1 as measured at vibration sensitive buildings. The measurement
shall be the maximum of 3 mutually perpendicular directions taken at the
ground surface at any vibration sensitive building. 
iv    At the reasonable request of the planning authority, following a complaint
relating to vibration from blasting operations to form borrow pits, the
developer shall measure at its own expense ground vibration to ensure
compliance with the above condition. The results of such monitoring shall
thereafter be forwarded to the planning authority. 
Reason: to ensure that any blasting is carried out safely and so as to minimise
the impact on neighbouring amenity. 
20. Micro-siting
a)  All wind turbines, buildings, masts, areas of hardstanding and tracks shall
be constructed in the locations shown in Figure 1.1 Site Layout. The
location of the wind turbines, compounds, areas of hardstanding and
tracks may be varied (micro-sited) within the site subject to the following,
unless otherwise approved in advance in writing by the planning authority: 
i. no wind turbine, building, mast, tracks, hardstanding or other
ancillary infrastructure shall be moved more than 100 metres from
the position shown within the Figure 1.1 Site Layout. If any micro-
siting is sought, it must first of all be approved in writing by the
planning authority (in consultation with the Ministry of Defence -
Safeguarding). 
ii. the exceptions to this will relate to tracks between T4 to T7 where
micro-siting allowance can extend beyond 100m to ensure tracks
can be moved onto shallower peat. 
iii. all micro-siting permissible under this condition must be approved in
advance in writing by the ECoW appointed in accordance with
condition 10.
iv. for any micro-siting of turbines which results in an increase in altitude 
of more than 5m from the approved position, a prior request for 
approval in writing must be made to the planning authority (in 
consultation with the Ministry of Defence, Safeguarding). Such a 
request must be accompanied by an updated and comparative ZTV 
plan and wireline montages as required by the planning authority. No 
such micro-siting can take place without the written approval of the     
planning authority. 
b)  No later than two months after the date of final commissioning, an
updated site plan shall be submitted to the planning authority showing the
final position of all wind turbines, anemometry masts, areas of
Page 48

Page 49

hardstanding, tracks and associated infrastructure forming part of the
development. The plan must also specify areas where micro-siting has
taken place and, for each instance, be accompanied by the ECoW or the
planning authority’s written approval, as applicable. 
Reason: to ensure that micro-siting decisions take account of environmental
impacts and local ground conditions, including existing infrastructure. 
21. Buffer zones
The buffer zones around groundwater abstractions and watercourses identified
on Figure 8.6 Constraints of the EIA report shall be implemented in full
throughout the construction, operation and decommissioning of the
development.  
The groundwater abstractions buffer zone shall be 100 metres for all
development with excavations or intrusions less than 1 metre depth. The buffer
zone shall be 250 metres for all development with excavations or intrusions
greater than 1 metre depth. 
There shall be no development, machinery movement or operations within the
buffer zones without the agreement of the planning authority in consultation
with the Scottish Environment Protection Agency. The buffer zone around the
groundwater abstraction areas shall be demarcated on the ground during
construction. 
Reason: to prevent potential unacceptable impacts on groundwater
abstractions. 
22. Shadow flicker
At the reasonable request of the planning authority following a complaint, the
developer shall investigate and instigate appropriate mitigation measures to
minimise the effects of shadow flicker. 
Reason: to ensure mitigation can be pursued and instigated in the event of
such a complaint being received. 
23. Restoration of borrow pits
Prior to the construction of the final turbine, a finalised restoration plan for any
borrow pits used on site, including the programme and timescales for the
restoration, must be submitted to, and approved in writing by the planning
authority in consultation with the Scottish Environment Protection Agency.
Thereafter the restoration shall be carried out in accordance with the plan. 
Reason: to ensure the restoration of borrow pit(s) at the end of the construction
period to mitigate the environmental impact. 
24. Mitigation
The development shall be developed in accordance with the schedule of
mitigation as specified in chapter 15 Schedule of Mitigation Table 15.1 of
volume I of the EIA report. The measures contained within, must be carried out
in accordance with the submitted information contained within the EIA Report or
as required by other conditions of this permission. 
Page 49

Page 50

Reason: to ensure the various mitigation measures proposed and collated
within the EIA Report in Table 15.1 are met. 
25. Aviation Lighting
Prior to commencing construction of any wind turbine generators, or deploying
any construction equipment or temporal structure(s) 50 metres or more in
height (above ground level) an aviation lighting scheme must be submitted to
the planning authority for approval in conjunction with the Ministry of Defence
defining how the development will be lit throughout its life to maintain civil and
military aviation safety requirements as deemed necessary for aviation safety
by the Ministry of Defence. 
This should set out:
a)  details of any construction equipment and temporal structures with a total
height of 50 metres or greater (above ground level) that will be deployed
during the construction of wind turbine generators and details of any
aviation warning lighting that they will be fitted with; and 
b)  the locations and heights of all wind turbine generators and any
anemometry mast featured in the development identifying those that will
be fitted with aviation warning lighting identifying the position of the lights
on the wind turbine generators; the type(s) of lights that will be fitted and
the performance specification(s) of the lighting type(s) to be used. [specify
shielded lights as per the lighting strategy] 
Thereafter, the developer must exhibit such lights as detailed in the approved
aviation lighting scheme. The lighting installed will remain operational for the
lifetime of the development. 
Reason: to maintain aviation safety. 
26. Aviation Charting and Safety Management
The developer must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information:
a)  the date of the commencement of the erection of wind turbine generators; 
b)  the maximum height of any construction equipment to be used in the
erection of the wind turbines; 
c)  the date any wind turbine generators are brought into use; and
d)  the latitude and longitude and maximum heights of each wind turbine
generator, and any anemometer mast(s). 
The Ministry of Defence must be notified of any changes to the information
supplied in accordance with these requirements and of the completion of the
construction of the development. 
Reason: To maintain aviation safety. 
27. Decommissioning, Restoration and Aftercare
a) The development will cease to generate electricity by no later than the
date falling 35 years from the date of final commissioning. The total period
for decommissioning and restoration of the site in accordance with this
condition shall not exceed 37 years from the date of final commissioning
without prior written approval of the planning authority. 
b) Prior to the commencement of development an outline decommissioning,
Page 50

Page 51

restoration and aftercare method statement shall be submitted to and
approved in writing by the planning authority in consultation with the
Scottish Environment Protection Agency. The method statement shall
include measures for the decommissioning of the development,
restoration and aftercare of the site and will include, without limitation,
proposals for the removal of the PPA-300-2066 42 above ground
elements of the development, the treatment of ground surfaces, the
management and timing of the works and environmental management
provisions. 
c) No later than one year prior to decommissioning of the development or
the expiration of the 35 year period of operation (whichever is the earlier)
a detailed decommissioning, restoration and aftercare method statement,
based upon the principles of the approved outline decommissioning,
restoration and aftercare method statement, shall be submitted to the
planning authority for written approval in consultation with the Scottish
Environment Protection Agency. The detailed decommissioning,
restoration and aftercare method statement will provide updated and
detailed proposals for the removal of above ground elements of the
development, the treatment of ground surfaces, the management and
timing of the works and environment management provisions. 
d)  The development shall be decommissioned, site restored and aftercare
thereafter undertaken in accordance with the detailed decommissioning,
restoration and aftercare method statement as approved, unless
otherwise agreed in writing in advance with the planning authority in
consultation with Scottish Environment Protection Agency. 
Reason: to ensure the decommissioning and removal of the development in an
appropriate and environmentally acceptable manner and the restoration and
aftercare of the site, in the interests of safety, amenity and environmental
protection. 
28. Financial Guarantee
a)  No development shall commence unless and until a bond or other form of
financial guarantee in terms acceptable to the planning authority, acting
reasonably, which secures the cost of performance of all
decommissioning, restoration and aftercare obligations referred to in
condition immediately above is submitted to the planning authority. 
b)  The value of the financial guarantee shall be agreed between the
developer and the planning authority or, failing agreement, determined (on
application by either party) by a suitably qualified independent
professional as being sufficient to meet the costs of all decommissioning,
restoration and aftercare obligations referred to in condition 27 above. 
c)  The financial guarantee shall be maintained in favour of the planning
authority until the date of completion of all decommissioning, restoration
and aftercare obligations referred to in condition 27 above. 
d)  The value of the financial guarantee shall be reviewed by agreement
between the developer and the planning authority or, failing agreement,
determined (on application by either party) by a suitably qualified
independent professional no less than every five years and increased or
Page 51

Page 52

decreased to take account of any variation in costs of compliance with
decommissioning, restoration and aftercare obligations and best practice
prevailing at the time of each review. 
e)  The landowner of the development site shall be entitled to be a joint
beneficiary with the planning authority under the foregoing financial
guarantee. The terms of the landowner’s involvement will be subject to the
approval of the planning authority acting reasonably and thereafter will be
set out in the financial guarantee documentation. 
Reason: to ensure that there are sufficient funds to secure performance of the
decommissioning, restoration and aftercare conditions attached to this deemed
planning permission in the event of default by the developer. 
29. Reduced lighting scheme
Unless otherwise agreed in writing with the planning authority, prior to
development commencing a proposed lighting scheme based on the lighting
strategy detailed in appendix 6.4 of the EIA report, together with a report
detailing the investigations into a reduced lighting scheme and the measures
that can be taken (or evidence of why they cannot be achieved), must be
submitted to and approved in writing by the planning authority in consultation
with the Ministry of Defence Windfarm Safeguarding and the Civil Aviation
Authority. Thereafter the lighting scheme must be implemented in accordance
with the approved scheme. 
Reason: to ensure that only the minimum necessary lighting requirement are
developed and to allow for further consideration of the lighting proposals. 
30. No development shall commence unless and until an Air Traffic Control Radar
Mitigation Scheme to address the impact of the wind turbines upon air safety
has been submitted to and approved in writing by Moray Council in conjunction
with the Ministry of Defence (MOD). 
The Air Traffic Control Radar Mitigation Scheme (ATCRMS) is a scheme
designed to mitigate the impact of the development upon the operation of the
Primary Surveillance Radar at RAF Lossiemouth (“the Radar”) and the air traffic
control operations of the MOD which are reliant upon the Radar. The ATCRMS
shall set out the appropriate measures to be implemented to mitigate the
impact of the development on the Radar and shall be in place for the lifetime of
the development provided the Radar remains in operation. 
The development shall be implemented strictly in accordance with the details
set out in the approved ATCRMS. 
Reason: in order to ensure that the appropriate mitigation measures are in
place prior to the windfarm becoming operational. 
31. No wind turbine erected as part of this development shall be permitted to rotate
its rotor blades about its horizontal axis, other than for the purpose of testing
radar mitigation for this development for specific periods as defined in the
approved Air Traffic Control Radar Mitigation Scheme (ATCRMS) or otherwise
arranged in accordance with provisions contained in the approved ATCRMS,
until: 
Page 52

Page 53

a)  those mitigation measures required to be implemented prior to any wind
turbine being permitted to rotate its rotor blades about its horizontal axis
as set out in the approved ATCRMS have been implemented; and 
b)  any performance criteria specified in the approved ATCRMS and which
the approved ATCRMS requires to have been satisfied prior to any wind
turbine being permitted to rotate its rotor blades about its horizontal axis
have been satisfied and Moray Council as Planning Authority, in
conjunction with the Ministry of Defence, have confirmed this in writing. 
Thereafter the development shall be operated strictly in accordance with the
details set out in the approved ATCRMS for the lifetime of the development,
provided the Radar remains in operation. 
Reason: in order to ensure that the appropriate mitigation measures are in
place prior to the windfarm becoming operational. 
5. PLANNING APPLICATION 23/02157/APP 
Councillor Divers, having declared an interest in this item, left the meeting at this
juncture and took no part in the decision. 
Ward 4 – Fochabers Lhyanbryde 
Vary condition 19 of 19/01080/APP to permit construction of footpath prior to
occupation of any dwelling unit on Land At St Andrews Terrace, Lhanbryde,
Moray for Springfield Properties PLC 
A report was submitted by the Appointed Officer recommending that, for reasons
detailed in the report, planning permission be granted to vary condition 19 of
19/01080/APP to permit construction of footpath prior to occupation of any dwelling
unit on Land At St Andrews Terrace, Lhanbryde, Moray for Springfield Properties
PLC. 
During her introduction, Mrs MacDonald, Senior Planning Officer advised that,
although the report stated that Transport Scotland had not made any comment, a
response has now been received asking that the conditions on the original consent
be reiterated.  This was noted. 
The meeting noted that the application had been referred to Committee in terms of
the Scheme of Delegation as it is a major application. 
Following consideration, the Committee unanimously agreed to grant planning
permission in respect of Planning Application 23/02157/APP subject to the following
conditions and reasons: 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act
1997 as amended. 
2. No works in connection with the development hereby approved shall Page 53

Page 54

commence unless an archaeological Written Scheme of Investigation (WSI)
has been submitted to and approved in writing by the Council, as planning
authority and a programme of archaeological works has been carried out in
accordance with the approved WSI. The WSI shall include details of how the
recording and recovery of archaeological resources found within the application
site shall be undertaken, and how any updates, if required, to the WSI will be
provided throughout the implementation of the programme of archaeological
works. Should the archaeological works reveal the need for post excavation
analysis the development hereby approved shall not be occupied unless a
Post-Excavation Research Design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the Council, as planning authority. The PERD shall be
carried out in complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. 
3. No development shall commence until full details (including scaled elevation
drawings) of the proposed 'key buildings' identified in the placemaking
statement received on 25 November 2020 and drawing LH01_PL_07 have
been submitted to and approved in writing by the Council, as Planning
Authority. For the avoidance of doubt the key buildings shall reflect the house
types approved as part of the application. Thereafter development shall not
proceed except in accordance with the approved details. 
Reason: To ensure that the proposals harmonise with the character of the
development and the wider area and because no such details were included
with the application. 
4. Notwithstanding the submitted landscaping plans no development shall
commence until additional plans have been submitted to and approved in
writing by the Council, as planning authority incorporating all the currently
proposed details along with all measures identified in the submitted
placemaking statement received on 25 November 2020 and the biodiversity
plan received on 2 October. For the avoidance of doubt the revised plans shall
include:
• Details of all measures to provide distinctive planting in each character
area;
• Full specification for the proposed woodland paths;
• A full maintenance schedule including woodland areas;
• Full details (scaled drawings 1:50) of the proposed entrance walls which
shall be constructed in stone;
• Written details of sizes of trees and shrub planting to be semi-mature
plants and not heavy standard as noted on the submitted drawings;
• Details of the type and location of all proposed bat and bird boxes and
timing of provision; and
• A method statement for the creation of the proposed wetland areas and a
maintenance schedule. 
Thereafter all landscaping works shall be carried out in accordance with the
approved details. Unless otherwise agreed as part of the approved details all
planting, seeding or turfing shall be carried out in the first planting season
following the first occupation of any of the units hereby approved. Any trees or
plants which (within a period of 5 years from the planting) die, are removed or
become seriously damaged or diseased shall be replaced in the following
Page 54

Page 55

planting season with others of similar size, number and species unless
otherwise approved by the Council, as Planning Authority. 
Reason: To ensure that the approved landscaping works are timeously carried
out and properly maintained in a manner which will not adversely affect the
development or amenity and character of the area and because no such
information was included with the application. 
5. No development shall commence until details of the landscaping treatment
along the trunk road boundary has been submitted to, and approved by, the
Council, as Planning Authority, after consultation with Transport Scotland.
Thereafter the approved details shall be implemented in full prior to the first
occupation of any part of the development. 
Reason: To ensure that there will be no distraction to drivers on the trunk road,
and that the safety of the traffic on the trunk road will not be diminished. 
6. No development shall commence until a Peat Management Plan,
demonstrating avoidance of areas of deep peat and details of quantities and
appropriate reuse of excavated peat and any mitigation or restoration
proposals, has been submitted to and approved in writing by the Council, as
Planning Authority in consultation with SEPA, and thereafter shall be
implemented in full on site. 
Reason: In order to minimise disturbance of peat and ensure the appropriate
reuse and management of peat on site. 
7. No development shall commence until details of measures to protect and
enhance the M9 habitat (as identified in the submitted Lhanbryde Development
Site: Badger and GWDTE survey by Highland Ecology and Development
Services) have been submitted to and approved in writing by the Council, as
Planning Authority in consultation with SEPA. Thereafter development shall not
proceed except in accordance with these approved details. 
Reason: To protect the water environment. 
8. No development shall commence until a Badger Mitigation Plan has been
submitted to and approved in writing by the Council, as Planning Authority. For
the avoidance of doubt the plan shall allow for the channelling of badgers
around the site. The construction of the development shall be implemented in
accordance with the approved Badger Mitigation Plan. 
Reason: To minimise the potential conflict with badgers during construction. 
9. As part of the development hereby approved, the accessible housing units shall
be provided in line with the detail in accordance with the Moray Council's DP2
Policy Guidance Note on Accessible Housing. Prior to any development
commencing, a compliance statement, along with detailed floor plans at a
suitable scale, which demonstrate compliance with the Policy Guidance, shall
be submitted to and approved in writing by the Council, as Planning Authority.
Thereafter, the accommodation as identified shall, at all times, remain as
accessible housing and remain capable for adaptation for accessible housing
needs unless otherwise agreed with the Council, as Planning Authority. For the
avoidance of doubt 10% of the private housing units hereby approved shall be
Page 55

Page 56

accessible units. Furthermore, evidence must be provided that level access to
each unit can be achieved from parking to an external door within 15m. 
Reason: To ensure an acceptable form of development in terms of the required
provision and delivery of accessible housing within the site as required and
defined in terms of current planning policy and associated supplementary
planning guidance. 
10. The 19 units identified as affordable housing on approved plan LH01_PL_01
revision L shall only be used for affordable housing purposes in accordance
with the agreement(s) reached between the applicant/developer and Moray
Council and/or any registered social landlord (e.g. housing association or
similar) to enable the long term delivery of affordable housing on this site; and
no development shall commence until details of the agreement(s) to confirm the
arrangements for the delivery of the proposed affordable accommodation
hereby approved shall be submitted to and approved in writing by the Council,
as Planning Authority. 
Thereafter, the development shall be implemented in accordance with the
approved details. 
Reason: To ensure an acceptable form of development in terms of the required
provision and delivery of the affordable housing accommodation proposed for
this site wherein the benefits of such provision are passed on to serve the
community in future years. 
11. No trees other than those identified for removal in the submitted Arboricultural
Impact Assessment/Method Statement by Urban-Arb Arboricultural Consultants
and Tree Protection Plan rev B sheets 1-3 shall be removed without the prior
written approval of the Council, as planning authority. 
Reason: In order to ensure tree removal is adequately controlled. 
12. No development shall commence until the tree protection measures detailed in
the submitted Arboricultural Impact Assessment/Method Statement by Urban-
Arb Arboricultural and Tree Protection Plan rev B sheets 1-3 have been
implemented in full. 
Reason: In order to ensure adequate measures to protect retained trees are in
place. 
13. Notwithstanding submitted drawing 1706.16352 (ExampleDesign_SpringfieldP)
no development shall commence until full details (scaled drawing 1:100 and
equipment specification schedule) of an equipped play area as identified on
approved plan LH01_PL_01 revision L including the maintenance
arrangements have been submitted to and approved in writing by the Council,
as Planning Authority. The equipped play area shall make provision for all-
abilities access including in relation to the surface finish, play equipment and
seating. The equipped play area shall be provided in accordance with the
approved details and be available for use prior to the occupation of the 25th
unit hereby approved. Thereafter the play area shall be maintained in
accordance with the approved maintenance arrangements. 
Page 56

Page 57

Reason: To ensure the adequate provision of an equipped play area and its
future maintenance. 
14. No development shall commence until details confirming the installation of fibre
broadband connection for each residential unit (to be provided prior to
occupation of each unit) have been submitted to and approved in writing by the
Council, as Planning Authority. Thereafter, the development shall be
implemented in accordance with these approved details, unless otherwise
agreed in writing by the Council, as Planning Authority. 
Reason: To ensure the residential units hereby approved are served by
appropriate high speed internet connections, in accordance with policy PP3 -
Infrastructure and Services of the Moray Local Development Plan 2020. 
15. No development shall commence until details (scaled drawings) of a safe and
suitable connection from the site to the existing cycle path on the north side of
St Andrews Road have been submitted to and approved in writing by the
Council, as Planning Authority. The connection shall be provided prior to the
completion of any house or flat. 
Reason: To ensure adequate connectivity to and through the site. 
16. Notwithstanding the details submitted within the Transport Assessment on
Drawing No 180980-900 (which is not accepted), no development shall
commence until the following details have been submitted and approved in
writing by the Council, as Planning Authority in Consultation with the Roads
Authority:
i.  Details (Plan 1:500) for two new bus stops (one in each direction) on St
Andrews Road (including road markings or laybys as required, shelters
and flags); and
ii.  A Road Safety Audit (Stage 1/2) which has been carried out in
accordance with the requirements set out in the Design Manual for Roads
and Bridges taking account of the proposed bus stops and site access.
The proposals shall be revised to take account of any agreed mitigation
and thereafter the bus stops and any other agreed mitigation required
shall be provided in accordance with the approved details prior to the
completion of any house or flat. 
Reason: To ensure adequate provision is made for accessibility to public
transport, the provision of details lacking from the submission and in the
interests of road safety. 
17. No development shall commence until details comprising a Root Protection
Plan have been submitted to and approved in writing by the Council, as
Planning Authority in consultation with the Roads Authority. The root protection
measures shall be installed in accordance with the agreed Root Protection
Plan. No trees shall be planted within 5.0m of the edge of the public road
carriageway unless agreed root protection is provided.
Reason: To prevent root interference that could compromise the public road
carriageway (and the utilities contained therein) thereby ensuring acceptable
infrastructure at the development access, in the interests of road safety. 
18. Notwithstanding the parking details submitted on the Parking Provision EV
Charging Drawings LH01_PL_ 8, 9 and 10 (which are not accepted), no
Page 57

Page 58

development shall commence until the following details have been submitted
for approval by the Council, as Planning Authority in consultation with the
Roads Authority:
• Details (Plan 1:200) showing the provision of electric vehicle charging
infrastructure at a rate of 1 per flat for Plots 3-10 and parking spaces
accessible within 5 metres.
• Statement/specifications to confirm that the EV charging supply and
cabling provision for each plot will be suitable for the connection of a 7Kw
'Fast' type charging unit as a minimum.
• Design/specifications for the proposed mounting/installations to be
provided for any future EV charging points which shall not be mounted on
a wall/within a garage. 
Thereafter the development shall be completed in accordance with the
approved details, the parking and EV charging provision associated with each
house or flat shall be completed prior to occupation and shall be maintained
and available for this purpose unless otherwise agreed in writing by the
Council, as Planning Authority in consultation with the Roads Authority. 
Reason: In the interests of an acceptable form of development and the
provision of infrastructure to support the use of low carbon transport, through
the provision of details currently lacking from the submission. 
19. Notwithstanding the parking details shown on plan LH01_PL_01 revision L, no
development shall commence until the following details have been submitted
for approval by the Council, as Planning Authority in consultation with the
Roads Authority:
i.  a plan (1:500) showing the provision of 3 parking spaces for plot 12 (Type
F); and
ii.  a plan showing 2 additional lay-by type parking spaces at a location to be
agreed on the north side of the site access road between Plot 22 and the
'Kickabout area' (as shown on Drawing LH01_PL_05). 
Thereafter the development shall be completed in accordance with the
approved details and parking provision associated with each house or flat shall
be completed prior to the occupation of said house or flat and maintained for
this purpose unless otherwise agreed in writing by the Council, as Planning
Authority in consultation with the Roads Authority. 
Reason: Submission of additional information to ensure adequate provision is
made for car parking within the development, and to ensure the permanent
availability of the level of parking necessary for residents/visitors/others in the
interests of an acceptable development and road safety. 
20. Prior to the first occupation of any house or flat the footway on the south of St
Andrews Road connecting the site access with the existing footway to the east
of the site must be completed and available for use by the public. 
Reason: To ensure adequate provision for non-vehicular road users in the
interests of road safety. 
21. A visibility splay of 4.5m x 160m to the west and 4.5m x 90m to the right (as
shown on Drawing No. LH01-ENG-700 Rev) shall be provided in accordance
with the approved drawing prior to any works commencing on the access
Page 58

Page 59

(except for those works associated with the provision of the visibility splay); and
i.  a schedule of maintenance for the visibility splay shall be provided prior to
the access becoming operational; and
ii. the visibility splay shall be maintained at all times free from any
obstruction exceeding 0.26m metres above the level of the carriageway in
accordance with the agreed schedule of maintenance, unless otherwise
agreed in writing by the Council, as Planning Authority in consultation with
the Roads Authority. 
Reason: To enable drivers of vehicles entering or exiting the site to have a
clear view so that they can undertake the manoeuvre safely and with the
minimum interference to the safety and free flow of traffic on the public road. 
22. Driveways over service verges shall be constructed to accommodate vehicles
and shall be surfaced with bituminous macadam unless otherwise agreed with
the Council, as Planning Authority in consultation with the Roads Authority. 
Reason: To ensure acceptable infrastructure is provided at the property
accesses. 
23. No works shall commence on site until a Construction Traffic Management Plan
(CTMP) has been submitted to and approved in writing by the Council, as
Planning Authority in consultation with the Roads Authority. The CTMP shall
include as a minimum the following information:
• Details of any temporary construction access from the public road;
• Duration of works;
• Construction programme;
• Details of construction traffic routes to the site;
• Measures to be put in place to prevent material being deposited on the
public road, monitoring and arrangements to clean the road if necessary;
• Traffic management measures to be put in place during works including
any specific instructions to drivers;
• Parking provision for site staff;
• Drop-off and turning provision for delivery vehicles to ensure entry and
exit in a forward gear;
• Hours of operation and restrictions during school arrival and departure
times from the existing housing; and
• Arrangements for providing residents with information on works, points of
contact for liaison and emergencies.
Thereafter, the development works shall proceed in accordance with the
approved details, unless otherwise approved in writing by the Council, as
Planning Authority in consultation with the Roads Authority. 
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site, road
safety and the amenity of the area/adjacent properties. 
24. The development shall meet the following requirements:
a)  Except for the formation of a single access route, there should be no built
development - including any land-raising - within the area shown as being
at risk of flooding in Figure 10 (p28) of the Flood Risk Assessment (1601 -
Lhanbryde, Moray, FRA Aug 19) by Kaya Consulting. (Note SEPA
advises that while there should be no built development including land
raising, this area should be sustainably managed).
Page 59

Page 60

b)  No development shall commence until the detailed design of the access
route, including provision of compensatory storage and flood relief
culverts has been agreed in writing with the Council, as Planning Authority
in consultation with SEPA and thereafter the agreed details shall be
implemented in full on site. 
Reason: To protect people and property from flood risk in line with Scottish
Planning Policy. 
25. Prior to the first occupation of any unit hereby approved the acoustic barrier
shall be installed at the location as described in Figure 4, page 11 of the Noise
Impact Assessment supporting document by Charlie Fleming Associates Ltd, 5
Saltpans, Charlestown, Fife KY11 3EB, dated 20 September 2019, and titled
"Report on Road Traffic Sound For Springfield Properties At St Andrews Road,
Lhanbryde, Elgin, Moray". Thereafter, the approved barrier (or a suitable
equivalent approved in writing by the Council, as Planning Authority in
consultation with the Environmental Health Authority and the Trunk Roads
Authority) shall be retained during the lifetime of the development. 
Reason: To prevent noise nuisance. 
26. Prior to the first occupation of any units defined as plots 71-77 hereby approved
a post and wire fence shall be provided along the eastern boundary of the site. 
Reason: In the interests of the amenity of the surrounding area. 
27. Notwithstanding the details noted on approved drawings 2016/D/PL/01 (D
type), 2016FF_901 (FF type) and 2019AA_901 the feature cladding on each
elevation of these houses shall have a vertical orientation rather than a
horizontal orientation as detailed on the plans. 
Reason: In order to ensure all elements of the development harmonise
regardless of tenure. 
28. Notwithstanding the details noted in the placemaking statement received on 25
November and the material conditions drawing reference LH01_PL_04 revision
F, the render colour for the Coxton View Character Areas identified in the
foregoing shall not be white and shall instead by altered to cream or another
pale colour to be agreed in writing with the Council, as Planning Authority prior
to the commencement of any unit in this character area. 
Reason: In order to create a strong sense of place. 
29. All surface water drainage proposals shall be in accordance with the submitted
report 'Drainage Strategy Report, St Andrews Road, Lhanbryde'. All measures
for the management of surface water shall be implemented in full prior to the
first occupation of any residential unit hereby approved. Maintenance shall be
in accordance with the measures set out in the maintenance document
received on 23 November 2020. 
Reason: To ensure that surface water drainage is provided timeously and
complies with the principles of SUDS; in order to protect the water environment. 
Page 60

Page 61

30. There shall be no drainage connections to the trunk road drainage system. 
Reason: To ensure that the efficiency of the existing trunk road drainage
network is not affected. 
31. No development shall commence until details of the proposed foul pumping
station including elevations of all works, means of enclosures and associated
plant (including noise levels) have been submitted to, and approved by the
Council, as Planning Authority, in consultation with Environmental Health.
Thereafter the approved details shall be implemented in full prior to the first
occupation of any part of the development. 
Reason: To ensure an acceptable form of development as these details are
lacking from the application. 
Councillor Divers re-joined the meeting at this juncture. 
6. Proposal of Application Notice – 24/00001/PAN 
Proposed construction and installation of a battery energy storage system
(BESS) with a generating capacity of up to 50 megawatts and associated
infrastructure on land to the west of Keith Substation, Westerton Road, Keith 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing that a Proposal of Application Notice (PAN) was
submitted on 22 December 2023 on behalf of Keith Storage Solutions Ltd. 
Councillor Gatt thanked Officers for the map which had been circulated to the
Committee that outlined all the similar proposals in the area and raised concern at
the number of proposed developments of battery energy storage systems in this
area and queried whether the Applicant had considered any other sites.  He also
raised concern as to how the Scottish Fire and Rescue Service (SFRS) would be
able to respond to any fires on the site. 
Councillor Macrae shared the concern of Councillor Gatt in relation to the
intensification of batter storage in Keith and asked that the Applicant consult with the
SFRS and the Health and Safety Executive during the application preparation
process. 
Thereafter, the Committee unanimously agreed: 
(i) to note the terms of the report and asked that the following provisional
views/relevant issues be recorded and forwarded to the Applicant in order to
inform the development of their proposed formal application for planning
permission: 
• ask the Applicant if any other sites were considered and why this
particular site has been chosen, given the intensification of battery storage
in Keith;
• consultation take place with the SFRS and Health and Safety Executive
during the application preparation process; and 
Page 61

Page 62

(ii) that the matters raised by the Committee also be forwarded to consultees
likely to be involved in any formal application for planning permission for the
proposal. 
7. Proposal of Application Notice – 23/02233/PAN 
Part retrospective application for construction of agricultural road, initial hard
rock mineral extraction and mineral processing and construction of temporary
junction.  Part new application for hard rock quarry processing area, new
access junction and creation of ecological/bio diversity buffer and associated
ancillary quarry infrastructure (including but not limited to office, wheel wash,
perimeter bunding, welfare and landscaping) at Rosarie Quarry, Keith.   
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing that a Proposal of Application Notice (PAN) was
submitted on 21 December 2023 on behalf of Backmuir Trading Limited. 
Councillor Gatt noted that the proposal is adjacent to the A95 which is a very busy
road not in the best condition and that the proposal would contribute to the volume of
traffic on this road and asked that the Applicant consider mitigating factors to
address the increase in traffic volume onto this already busy road. 
The Development Management and Building Standards Manager confirmed that
Transport Scotland would be a statutory consultee on any planning application
received. 
Thereafter, the Committee unanimously agreed: 
(i) to note the terms of the report and asked that the following provisional
views/relevant issues be recorded and forwarded to the Applicant in order to
inform the development of their proposed formal application for planning
permission; 
• consider mitigating factors to address the increase in traffic volume
onto the A95 as a result of the development; and 
(ii) that the matters raised by the Committee also be forwarded to consultees
likely to be involved in any formal application for planning permission for the
proposal. 
8. Breach of Planning Conditions at site in Fochabers [Para 12] 
The Committee had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing of a breach of planning conditions relating to
landscaping. 
During discussion surrounding the Woodland Creation/Tree Landscaping Plan, it
was queried whether this could include the planting of evergreen trees. 
In response, the Development Management and Building Standards Manager
advised that she would ask the Applicant to consider including evergreen trees in the
Woodland Creation/Tree Landscaping Plan.
Page 62

Page 63

Thereafter, the Committee unanimously agreed: 
(i) to Officers issuing a Planning Enforcement Notice under Section 127 of the
Town and Country Planning (Scotland) Act 1997; the Enforcement Notice will
require persons with an interest in the land to comply with the outstanding
planning condition; 
(ii) that should the Notice not be complied with then authority is given to take
direct action to implement the planning condition; and 
(iii) that the Applicant be asked to consider including evergreen trees in the
Woodland Creation/Tree Landscaping Plan. 
Page 63

Page 64

Page 64

Page 65

GUIDANCE NOTE PRODUCED FOR PLANNING AND REGULATORY SERVICES COMMITTEE
MEETING OF 12 MARCH 2024 
REPORT ON APPLICATION 
“Note for guidance of the Committee where the decision of the Planning and Regulatory Services Committee
is contrary to the recommendations of the Depute Chief Executive (Economy, Environment and Finance) in
respect to a Planning Application.” 
Any Councillor putting forward a motion to refuse an application, contrary to recommendation, shall clearly state the
reasons for refusal.  These reasons should be based on policies contained in the approved National Planning
Framework 4 (NPF4), Local Development Plan or some other material consideration.  Time should be allowed to
ensure that these reasons are carefully noted for minuting purposes. 
Where Councillors put forward a motion to approve an application, contrary to recommendation, an indication should
be given of any specific matters which should be subject of conditions along with reasons which should be based on
policies in the approved Local Development Plan or some other appropriate consideration. 
Note for guidance where the decision of the Planning and Regulatory Services Committee is to depart from
the Development Plan (NFP4 and or Local Development Plan) 
Where a Councillor is convinced that there is reason to depart from Development Plan policy; then the Councillor’s
reasons for making the motion should be clearly stated for minuting purposes.  Any matters which should be subject to
conditions drafted subsequently by the Depute Chief Executive (Economy, Environment and Finance) should be
indicated. If the Committee remains of a mind to approve such an application then the whole matter will be subject to
statutory procedures as apply. In such cases, Councillors should be aware that the application may require to be
advertised as a departure and any objections reported to the next available meeting of the Planning and Regulatory
Services Committee.  It also may be necessary to convene a hearing to consider the views of objectors. 
There are three potential consequences if Committee takes a decision where the proper procedures have not been
followed in whole or in part.  Firstly, the person aggrieved by a decision may apply to the Supreme Courts in Scotland
for an Order either compelling the Council to act according to law, quashing the decision altogether or declaring a
decision to be unlawful coupled with an order to prevent the decision being implemented.  A referral to the Supreme
Courts in these circumstances is known as applying for Judicial Review.   
Secondly, in addition to the application for Judicial Review when questions of alleged failure, negligence or
misconduct by individuals or local authorities in the management of public funds arise and are raised either by or with
the External Auditor of the Council and where an individual can be blamed the sanctions available are:- 
Censure of a Councillor or an Officer
Suspension of a Councillor for up to one year
Disqualification of a Councillor for up to five years 
In the case of the Council being to blame, recommendations may be made to the Scottish Ministers about rectification
of the authority’s accounts. Ministers can make an order giving effect to these recommendations. 
Thirdly, whilst the Ombudsman accepts that Planning authorities have the freedom to determine planning applications
as they wish procedural impropriety may be interpreted as maladministration.  This can also lead to recommendations
by the Ombudsman that compensation be paid. 
Consistent implementation of departure procedures maintains public confidence in the planning system and is
consistent with the time and effort invested in preparing the NPF4 and Local Development Plan. 
Page 65

Page 66

Page 66

Page 67

WARD 04_17 
23/00892/APP
6th June 2023
Construction and operation of an aerobic digestion
facility and energy centre with associated landscaping
and drainage works on Land Approximately 150 Metres
To The West Of The Portgordon Maltings Buckie  
for Grissan Engineering Services Ltd 
Comments: 
• A site visit will have been carried out. 
• This application is being considered in conjunction with planning applications
23/00894/APP & 23/00895/APP, whereby together the cumulative impact is of a
scale similar to a major planning application. 
• Advertised for neighbour notification purposes – notification not possible because
no premises are situated on land to which notification can be sent. 
• Advertised as a development of a Class specified in Schedule 3 of the
Development Management Regulations 2013.
• No representations have been received.   
Procedure: 
• Determine planning application 23/00892/APP first as this includes necessary
infrastructure to support development of 23/002894/APP & 23/00895/APP. 
Recommendation 
Grant Planning Permission – Subject to the following: 
Conditions/Reasons 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act 1997
as amended. 
2. Prior to the commencement of any part of the development details (scaled plans
1:500 min) shall be submitted for approval in writing by the Planning Authority in
consultation with the Roads Authority for the provision of bend widening on the
A990 at Bin View Terrace including any associated works necessary to modify
Item 5.
Page 67

Page 68

road drainage, kerbing, services, signing and lining and repositioning of existing
bus stop infrastructure associated with this. The road profile shall be modified to
correct the camber for the new centreline and the full width of the road shall be
resurfaced over the extent of the road widening. Thereafter the works shall be
completed in accordance with the approved details prior to the completion of the
development or the development becoming operational (whichever is soonest). 
Reason: To ensure an acceptable infrastructure is provided on the route to/from
the development in the interests of road safety. 
3. No works shall commence on site until a Construction Traffic Management Plan
has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority. The Construction Traffic
Management Plan shall include the following information: 
a)   duration of works; 
b)   construction programme; 
c)   details for any Abnormal Indivisible Loads (AIL’s) including route
assessments; 
d)   details for the removal/disposal of any bulk material from site including
volume, type, destination and route; 
e)   anticipated schedule for delivery of materials and plant; 
f)   full details of any temporary construction access; 
g)   measures to be put in place to prevent material being deposited on the
public road; 
h)   traffic management measures to be put in place during works including any
specific instructions to drivers; and 
i)   parking provision, loading and unloading areas for construction traffic. 
Thereafter, the development shall be implemented in accordance with the
approved details.  
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site. 
4. No works in connection with the development hereby approved shall commence
unless an archaeological written scheme of investigation (WSI) has been
submitted to and approved in writing by the planning authority and a programme
of archaeological works has been carried out in accordance with the approved
WSI. The WSI shall include details of how the recording and recovery of
archaeological resources found within the application site shall be undertaken,
and how any updates, if required, to the written scheme of investigation will be
provided throughout the implementation of the programme of archaeological
works. Should the archaeological works reveal the need for post excavation
analysis the development hereby approved shall not be brought into use unless a
post-excavation research design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the planning authority. The PERD shall be carried out in
complete accordance with the approved details. 
Page 68

Page 69

Reason: To safeguard and record the archaeological potential of the area. The
above should be undertaken initially as a trial trenching evaluation of 7-10% of the
total proposed development site, to be carried out by a suitably qualified
archaeological contractor. 
5. Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive dwelling
shall be permitted between 0800 - 1900 hours, Monday to Friday and 0800 - 1300
hours on Saturdays only, and at no other times out with these permitted hours
(including National Holidays). The above construction hours shall apply, unless
otherwise agreed in writing with the Planning Authority, and where so
demonstrated exceptional operational constraints require limited periods of
construction works to be undertaken out with the permitted construction hours. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
6. No development shall commence until a Construction Environmental Management
Plan (CEMP) shall be submitted to and agreed in writing by the Planning Authority
in consultation with the Environmental Health Manager. The plan shall include
measures to minimise construction related noise (including vibration), dust and
artificial lighting. 
Thereafter the development will be carried out in accordance with the agreed plan. 
Reason: In order that environmental emissions are considered and managed at
the construction phase, in order to protect local residents. 
7. The rating level of noise associated with the development on its own and/or in
combination with the development 23/00894/APP and 23/00895/APP, shall not
exceed the background sound level at the nearest noise sensitive dwelling which
is lawfully existing or has planning permission at the date of this permission. The
background sound level for the daytime (0700 to 2300 hours) and night-time hours
(2300 to 0700 hours) associated with this consent has been identified within table
7 of the approved Noise Impact Assessment supporting document by Dice
Environmental Acoustics, dated 31st July 2023 Ref:101072-R01, Version 1 and
titled "Grissan, Portgordon Noise Impact Assessment". 
For the avoidance of doubt, the rating level and background sound level
associated with this condition are defined within BS 4142: 2014+A1:2019 Methods
for rating and assessing industrial and commercial sound. The receptor locations
for the background sound levels (stated as R1 to R4 in the above document) are
identified in Section 1.2 of the Noise Impact Assessment supporting document by
Ensafe Consultants, dated 28th September 2022 and titled "Noise Impact
Assessment for Grissan Engineering Services Ltd At Portgordon (West).
Document reference N 80109-1R1". 
Reason: In order that noise from the development is controlled so as not to cause
noise nuisance to local residents. 
Page 69

Page 70

8. No development shall commence until a Community Wealth Building Plan has
been submitted to and approved in writing by the Council as Planning Authority.
This plan shall include measures, targets and monitoring for the following areas as
appropriate;  
(a)    improving community resilience, reducing inequalities and maximising local
job creation;
(b)    increasing spending within communities and ensuring the maximum use of
local supply chains and services;
(c)    creation of new firms; and
(d)    enabling community ownership of buildings and infrastructure. 
The measures and monitoring shall thereafter be implemented in accordance with
the plan unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason:  To support a new strategic approach to economic development that
helps to build a wellbeing economy in accordance with National Planning
Framework 4 Policy 25 - Community Wealth Building. 
9. All planting and siting of bat and bird boxes as shown on the approved
landscaping plan (submitted 1/9/23 drawing number 149101/8001) shall be
undertaken in the first planting season following completion/occupation of the
development.  Any plants which, within a period of five years from the
completion/occupation of the development die, are removed, or become seriously
damaged or diseased, shall be replaced in the immediately following planting
season with others of a similar size and species.  
Reason: In order to ensure an acceptable level of planting in the interests of the
overall appearance and biodiversity levels within the site.   
10. Prior to development commencing, all tree protection measures as detailed in the
Tree Report by Forres Tree Services submitted in support of this planning
application shall be put in place and the development shall be carried out in
accordance with the good practice guidance contained within the Tree Report.   
Reason: To protect the root systems of the trees which bound the site to the
south.   
11. All surface water drainage provision within the development shall be implemented
in accordance with the details contained in the 'Drainage Impact Assessment, by
Fairhursts, dated August 2023, document number 149101-DA-01_Rev 2
submitted in support of this proposal.  The development hereby approved shall not
be brought into use until it is connected to the approved drainage arrangements. 
Reason: To ensure surface water from the house is disposed of in a sustainable
manner. 
12. The development shall be carried out in accordance with the mitigation measures
contained within the Preliminary ecology appraisal survey report dated 28 August
2023, Ref: WTTPEA23-07, submitted in support of this planning application. 
Page 70

Page 71

Reason: To ensure the development is carried out as sensitively as possible to
minimise impact on the surrounding natural environment. 
13. Prior to the development commencing details of the operational site lighting shall
be submitted to and agreed in writing by the Planning Authority, in consultation
with the Environmental Health Manager. Thereafter, the agreed lighting details
shall be maintained throughout the lifetime of the development. 
Reason: To protect residents from light nuisance due to the use of the
development. 
14. A construction phase surface water management plan shall be submitted a
minimum of two months prior to the commencement of the development and shall
be agreed in writing prior to work commencing with the Planning Authority in
consultation with Moray Flood Risk Management.  The plan shall include
measures to prevent increased flood risk and to ensure heavily silted surface
water does not enter any watercourse. 
Thereafter, the development shall be carried out in accordance with the agreed
details. 
Reason: To prevent surface water flooding during the course of the development
and minimise risk to adjacent watercourses. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal accords with the provisions of the development plan and there are no
material considerations that indicate otherwise.  The development is in keeping with
and does not expand the existing complex of buildings and structures at Portgordon to
an unacceptable level, sitting within lower land and a discrete location.  The benefits in
terms carbon savings and use of spend distillery bi-product support various aims within
National Planning Framework 4 and Moray Local Development 2020. 
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
A Building Warrant will be required for the proposals. Should you require further
assistance please contact the Building Standards Duty Officer between 2pm and
4pm or telephone on 03001234561. No appointment is necessary. Alternatively e-
mail buildingstandards@moray.gov.uk. 
Page 71

Page 72

THE TRANSPORTATION MANAGER has commented that:- 
Before commencing development, the applicant is obliged to apply for permission
to modify the existing public road, in accordance with Section 56 of the Roads
(Scotland) Act.  The applicant will be required to provide technical information,
including drawings and drainage calculations, a programme for the proposed
works.  Advice on the application process can be obtained by emailing
transport.develop@moray.gov.uk. 
Construction Consent shall include a CCTV survey of all existing roads drainage
to be adopted and core samples to determine the construction depths and
materials of the existing road.  The requirement for a Road Safety Audit for the
modifications to the existing public road will be determined through the Roads
Construction Consent process or subsequent to the road construction prior to any
road adoption. 
Planning consent does not carry with it the right to carry out works within the
public road boundary and the applicant is obliged to contact the Transportation
Manager for road opening permit in accordance with the Roads (Scotland) Act
1984.  This includes any temporary access joining with the public road. 
If required, street furniture which needs to be repositioned will be at the expense
of the developer.  In addition any existing roadside ditch may require a pipe or
culvert. Advice on these matters can be obtained by e-mailing
transport.develop@moray.gov.uk.  
No building materials/scaffolding/builder's skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall ensure that their operations do not adversely affect any Public
Utilities, which should be contacted prior to commencement of operations. 
The applicants shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
The Transportation Manager must always be contacted before any works
commence. This includes any temporary access, which should be agreed with the
Roads Authority prior to work commencing on it. 
THE REGIONAL ARCHAEOLOGIST, has commented that:- 
Works by archaeological organisation
Any archaeological survey, watching brief or archaeological works required by a
condition attached to this planning permission must be undertaken by a suitably
qualified archaeological organisation. 
Written Scheme of Investigation (WSI)
A written specification produced by the appointed Chartered Institute for
Archaeologists (CIfA) member archaeological contractor on behalf of the applicant
which outlines in detail the proposed scheme of archaeological investigation. It
Page 72

Page 73

should detail what archaeological works will be carried out and how; how any
encountered archaeological remains will be dealt with; how any updates to the
WSI will be provided; the reporting process; and the potential for post-excavation
requirement. The WSI must be submitted to the planning authority for approval
before being implemented. The contents of the WSI must conform to the relevant
national and CIfA standards and guidance. 
THE ENVIRONMENTAL HEALTH MANAGER, DEVELOPMENT SERVICES, has
commented that:- 
All digestates, liquid and solid, from the site shall be produced and certified to
'PAS 110: Specification for whole digestate, separated liquor and separated fibre
derived from the anaerobic digestion of source-segregated biodegradable
materials.' 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
149101/0001 E Proposed overall site plan
149101/0050  Gas upgrader general arrangement
149101/0051  Gas flare general arrangement
149101/0052  Grid entry general arrangement
149101/0101  Location plan
149101/0102  Proposed site plan
149101/0104  Site sections
149101/0105  Building elevations
149101/8001 Landscaping Plan
149101/6000 Flooding and Drainage 
Information to accompany decision: 
Drainage Impact Assessment, by Fairhursts, dated February 2023, document number
149101-DA-01. 
Tree Report by Forres Tree Services submitted in support of this planning application. 
Preliminary ecology appraisal survey report dated 28 August 2023, Ref: WTTPEA23-
07.
Page 73

Page 74

Page 74

Page 75

WARD 04_17 
23/00894/APP
6th June 2023
Construction and operation of an aerobic digestion
facility and energy centre with associated works Land
Approximately 200 Metres To The West Of The
Portgordon Maltings Buckie Moray 
for Grissan Engineering Services Ltd 
Comments: 
• A site visit will have been carried out. 
• This application is being considered in conjunction with planning applications
23/00892/APP & 23/00895/APP, whereby together the cumulative impact is of a
scale similar to a major planning application. 
• Advertised for neighbour notification purposes – notification not possible because
no premises are situated on land to which notification can be sent. 
• Advertised as a development of a Class specified in Schedule 3 of the
Development Management Regulations 2013.
• No representations have been received.   
Procedure: 
• None. 
Recommendation 
Grant Planning Permission – Subject to the following: 
Conditions/Reasons 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act 1997
as amended. 
2. Prior to the commencement of any part of the development details (scaled plans
1:500 min) shall be submitted for approval in writing by the Planning Authority in
consultation with the Roads Authority for the provision of bend widening on the
A990 at Bin View Terrace including any associated works necessary to modify
road drainage, kerbing, services, signing and lining and repositioning of existing
Page 75

Page 76

bus stop infrastructure associated with this.  The road profile shall be modified to
correct the camber for the new centreline and the full width of the road shall be
resurfaced over the extent of the road widening.  Thereafter the works shall be
completed in accordance with the approved details prior to the completion of the
development or the development becoming operational (whichever is soonest). 
Reason: To ensure an acceptable infrastructure is provided on the route to/from
the development in the interests of road safety. 
3. No works shall commence on site until a Construction Traffic Management Plan
has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority.  The Construction Traffic
Management Plan shall include the following information: 
a)   duration of works; 
b)   construction programme; 
c)   details for any Abnormal Indivisible Loads (AIL’s) including route
assessments; 
d)   details for the removal/disposal of any bulk material from site including
volume, type, destination and route; 
e)   anticipated schedule for delivery of materials and plant; 
f)   full details of any temporary construction access; 
g)   measures to be put in place to prevent material being deposited on the
public road; 
h)   traffic management measures to be put in place during works including any
specific instructions to drivers; and 
i)   parking provision, loading and unloading areas for construction traffic. 
Thereafter, the development shall be implemented in accordance with the
approved details.  
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site. 
4. No works in connection with the development hereby approved shall commence
unless an archaeological written scheme of investigation (WSI) has been
submitted to and approved in writing by the planning authority and a programme
of archaeological works has been carried out in accordance with the approved
WSI.  The WSI shall include details of how the recording and recovery of
archaeological resources found within the application site shall be undertaken,
and how any updates, if required, to the written scheme of investigation will be
provided throughout the implementation of the programme of archaeological
works.  Should the archaeological works reveal the need for post excavation
analysis the development hereby approved shall not be brought into use unless a
post-excavation research design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the planning authority.  The PERD shall be carried out in
complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. The
above should be undertaken initially as a trial trenching evaluation of 7-10% of the
Page 76

Page 77

total proposed development site, to be carried out by a suitably qualified
archaeological contractor. 
5. Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive dwelling
shall be permitted between 0800 - 1900 hours, Monday to Friday and 0800 - 1300
hours on Saturdays only, and at no other times out with these permitted hours
(including National Holidays).  The above construction hours shall apply, unless
otherwise agreed in writing with the Planning Authority, and where so
demonstrated exceptional operational constraints require limited periods of
construction works to be undertaken out with the permitted construction hours. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
6. No development shall commence until a Construction Environmental Management
Plan (CEMP) shall be submitted to and agreed in writing by the Planning Authority
in consultation with the Environmental Health Manager.  The plan shall include
measures to minimise construction related noise (including vibration), dust and
artificial lighting. 
Thereafter the development will be carried out in accordance with the agreed plan. 
Reason: In order that environmental emissions are considered and managed at
the construction phase, in order to protect local residents. 
7. The rating level of noise associated with the development on its own and/or in
combination with the development 23/00892/APP and 23/00895/APP, shall not
exceed the background sound level at the nearest noise sensitive dwelling which
is lawfully existing or has planning permission at the date of this permission.  The
background sound level for the daytime (0700 to 2300 hours) and night-time hours
(2300 to 0700 hours) associated with this consent has been identified within table
7 of the approved Noise Impact Assessment supporting document by Dice
Environmental Acoustics, dated 31st July 2023 Ref:101072-R01, Version 1 and
titled "Grissan, Portgordon Noise Impact Assessment". 
For the avoidance of doubt, the rating level and background sound level
associated with this condition are defined within BS 4142: 2014+A1:2019 Methods
for rating and assessing industrial and commercial sound. The receptor locations
for the background sound levels (stated as R1 to R4 in the above document) are
identified in Section 1.2 of the Noise Impact Assessment supporting document by
Ensafe Consultants, dated 28th September 2022 and titled "Noise Impact
Assessment for Grissan Engineering Services Ltd At Portgordon (West).
Document reference N 80109-1R1". 
Reason: In order that noise from the development is controlled so as not to cause
noise nuisance to local residents. 
8. No development shall commence until a Community Wealth Building Plan has
been submitted to and approved in writing by the Council as Planning Authority.
Page 77

Page 78

This plan shall include measures, targets and monitoring for the following areas as
appropriate  
(a)    improving community resilience, reducing inequalities and maximising local
job creation;
(b)    increasing spending within communities and ensuring the maximum use of
local supply chains and services;
(c)    creation of new firms; and
(d)    enabling community ownership of buildings and infrastructure. 
The measures and monitoring shall thereafter be implemented in accordance with
the plan unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason:  To support a new strategic approach to economic development that
helps to build a wellbeing economy in accordance with National Planning
Framework 4 Policy 25 - Community Wealth Building. 
9. All planting and siting of bat and bird boxes as shown on the approved
landscaping plan (submitted 1/9/23 drawing number 149101/8001) shall be
undertaken in the first planting season following completion/occupation of the
development.  Any plants which, within a period of five years from the
completion/occupation of the development die, are removed, or become seriously
damaged or diseased, shall be replaced in the immediately following planting
season with others of a similar size and species.  
Reason: In order to ensure an acceptable level of planting in the interests of the
overall appearance and biodiversity levels within the site.   
10. Prior to development commencing, all tree protection measures as detailed in the
Tree Report by Forres Tree Services submitted in support of this planning
application shall be put in place and the development shall be carried out in
accordance with the good practice guidance contained within the Tree Report.   
Reason: To protect the root systems of the trees which bound the site to the
south.   
11. All surface water drainage provision within the development shall be implemented
in accordance with the details contained in the 'Drainage Impact Assessment, by
Fairhursts, dated August 2023, document number 149101-DA-01_Rev 2
submitted in support of this proposal.  The development hereby approved shall not
be brought into use until it is connected to the approved drainage arrangements. 
Reason: To ensure surface water from the house is disposed of in a sustainable
manner. 
12. The development shall be carried out in accordance with the mitigation measures
contained within the Preliminary ecology appraisal survey report dated 28 August
2023, Ref: WTTPEA23-07, submitted in support of this planning application. 
Page 78

Page 79

Reason: To ensure the development is carried out as sensitively as possible to
minimise impact on the surrounding natural environment. 
13. Prior to the development commencing details of the operational site lighting shall
be submitted to and agreed in writing by the Planning Authority, in consultation
with the Environmental Health Manager.  Thereafter, the agreed lighting details
shall be maintained throughout the lifetime of the development. 
Reason: To protect residents from light nuisance due to the use of the
development. 
14. A construction phase surface water management plan shall be submitted a
minimum of two months prior to the commencement of the development and shall
be agreed in writing prior to work commencing with the Planning Authority in
consultation with Moray Flood Risk Management.  The plan shall include
measures to prevent increased flood risk and to ensure heavily silted surface
water does not enter any watercourse. 
Thereafter the development shall be carried out in accordance with the agreed
details. 
Reason: To prevent surface water flooding during the course of the development
and minimise risk to adjacent watercourses. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal accords with the provisions of the development plan and there are no
material considerations that indicate otherwise.  The development is in keeping with
and does not expand the existing complex of buildings and structures at Portgordon to
an unacceptable level, sitting within lower land and a discrete location.  The benefits in
terms carbon savings and use of spend distillery bi-product support various aims within
National Planning Framework 4 and Moray Local Development 2020. 
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
A Building Warrant will be required for the proposals. Should you require further
assistance please contact the Building Standards Duty Officer between 2pm and
4pm or telephone on 03001234561. No appointment is necessary. Alternatively e-
mail buildingstandards@moray.gov.uk. 
THE TRANSPORTATION MANAGER has commented that:- 
Before commencing development the applicant is obliged to apply for permission
to modify the existing public road, in accordance with Section 56 of the Roads
Page 79

Page 80

(Scotland) Act.  The applicant will be required to provide technical information,
including drawings and drainage calculations, a programme for the proposed
works.  Advice on the application process can be obtained by emailing
transport.develop@moray.gov.uk. 
Construction Consent shall include a CCTV survey of all existing roads drainage
to be adopted and core samples to determine the construction depths and
materials of the existing road.  The requirement for a Road Safety Audit for the
modifications to the existing public road will be determined through the Roads
Construction Consent process or subsequent to the road construction prior to any
road adoption. 
Planning consent does not carry with it the right to carry out works within the
public road boundary and the applicant is obliged to contact the Transportation
Manager for road opening permit in accordance with the Roads (Scotland) Act
1984.  This includes any temporary access joining with the public road. 
If required, street furniture which needs to be repositioned will be at the expense
of the developer.  In addition, any existing roadside ditch may require a pipe or
culvert. Advice on these matters can be obtained by e-mailing
transport.develop@moray.gov.uk.  
No building materials/scaffolding/builder's skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall ensure that their operations do not adversely affect any Public
Utilities, which should be contacted prior to commencement of operations. 
The applicants shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
The Transportation Manager must always be contacted before any works
commence. This includes any temporary access, which should be agreed with the
Roads Authority prior to work commencing on it. 
THE REGIONAL ARCHAEOLOGIST, has commented that:- 
Works by archaeological organisation 
Any archaeological survey, watching brief or archaeological works required by a
condition attached to this planning permission must be undertaken by a suitably
qualified archaeological organisation. 
Written Scheme of Investigation (WSI) 
A written specification produced by the appointed Chartered Institute for
Archaeologists (CIfA) member archaeological contractor on behalf of the applicant
which outlines in detail the proposed scheme of archaeological investigation.  It
should detail what archaeological works will be carried out and how; how any
encountered archaeological remains will be dealt with; how any updates to the
WSI will be provided; the reporting process; and the potential for post-excavation
requirement.  The WSI must be submitted to the planning authority for approval
Page 80

Page 81

before being implemented.  The contents of the WSI must conform to the relevant
national and CIfA standards and guidance. 
THE ENVIRONMENTAL HEALTH MANAGER, DEVELOPMENT SERVICES, has
commented that:- 
All digestates, liquid and solid, from the site shall be produced and certified to
'PAS 110: Specification for whole digestate, separated liquor and separated fibre
derived from the anaerobic digestion of source-segregated biodegradable
materials'. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
149101/0201  Location plan
149101/0050  Gas upgrader details
149101/0052  Grid Entry Unit
149101/0202  Proposed site plan
149101/0204  Site sections
149101/0001 E Proposed overall site plan 
149101/6000 Flooding and Drainage
149101/8001 Landscaping Plan 
Information to accompany decision: 
Drainage Impact Assessment, by Fairhursts, dated February 2023, document number
149101-DA-01 
Tree Report by Forres Tree Services submitted in support of this planning application. 
Preliminary ecology appraisal survey report dated 28 August 2023, Ref: WTTPEA23-07 
Page 81

Page 82

Page 82

Page 83

WARD 04_17 
23/00895/APP
6th June 2023
Construction and operation of an aerobic digestion
facility and energy centre with associated works Land
Approximately 250 Metres To The West Of Portgordon
Maltings Buckie Moray 
for Grissan Engineering Services Ltd 
Comments: 
• A site visit will have been carried out. 
• This application is being considered in conjunction with planning applications
23/00892/APP & 23/00894/APP, whereby together the cumulative impact is of a
scale similar to a major planning application. 
• Advertised for neighbour notification purposes – notification not possible because
no premises are situated on land to which notification can be sent. 
• Advertised as a development of a Class specified in Schedule 3 of the
Development Management Regulations 2013.
• No representations have been received.   
Procedure: 
• None. 
Recommendation 
Grant Planning Permission – Subject to the following: 
Conditions/Reasons 
1. The development to which this permission relates must be begun not later than
the expiration of 3 years beginning with the date on which the permission is
granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act 1997
as amended. 
2. Prior to the commencement of any part of the development details (scaled plans
1:500 min) shall be submitted for approval in writing by the Planning Authority in
consultation with the Roads Authority for the provision of bend widening on the
A990 at Bin View Terrace including any associated works necessary to modify
Page 83

Page 84

road drainage, kerbing, services, signing and lining and repositioning of existing
bus stop infrastructure associated with this.  The road profile shall be modified to
correct the camber for the new centreline and the full width of the road shall be
resurfaced over the extent of the road widening.  Thereafter the works shall be
completed in accordance with the approved details prior to the completion of the
development or the development becoming operational (whichever is soonest). 
Reason: To ensure an acceptable infrastructure is provided on the route to/from
the development in the interests of road safety. 
3. No works shall commence on site until a Construction Traffic Management Plan
has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority. The Construction Traffic
Management Plan shall include the following information: 
a)   duration of works; 
b)   construction programme; 
c)   details for any Abnormal Indivisible Loads (AIL’s) including route
assessments; 
d)   details for the removal/disposal of any bulk material from site including
volume, type, destination and route; 
e)   anticipated schedule for delivery of materials and plant; 
f)   full details of any temporary construction access; 
g)   measures to be put in place to prevent material being deposited on the
public road; 
h)   traffic management measures to be put in place during works including any
specific instructions to drivers; and 
i)   parking provision, loading and unloading areas for construction traffic. 
Thereafter, the development shall be implemented in accordance with the
approved details.  
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site. 
4. No works in connection with the development hereby approved shall commence
unless an archaeological written scheme of investigation (WSI) has been
submitted to and approved in writing by the planning authority and a programme
of archaeological works has been carried out in accordance with the approved
WSI.  The WSI shall include details of how the recording and recovery of
archaeological resources found within the application site shall be undertaken,
and how any updates, if required, to the written scheme of investigation will be
provided throughout the implementation of the programme of archaeological
works.  Should the archaeological works reveal the need for post excavation
analysis the development hereby approved shall not be brought into use unless a
post-excavation research design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the planning authority.  The PERD shall be carried out in
complete accordance with the approved details. 
Page 84

Page 85

Reason: To safeguard and record the archaeological potential of the area.  The
above should be undertaken initially as a trial trenching evaluation of 7-10% of the
total proposed development site, to be carried out by a suitably qualified
archaeological contractor. 
5. Construction works (including vehicle movements) associated with the
development audible at any point on the boundary of any noise sensitive dwelling
shall be permitted between 0800 - 1900 hours, Monday to Friday and 0800 - 1300
hours on Saturdays only, and at no other times out with these permitted hours
(including National Holidays).  The above construction hours shall apply, unless
otherwise agreed in writing with the Planning Authority, and where so
demonstrated exceptional operational constraints require limited periods of
construction works to be undertaken out with the permitted construction hours. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
6. No development shall commence until a Construction Environmental Management
Plan (CEMP) shall be submitted to and agreed in writing by the Planning Authority
in consultation with the Environmental Health Manager.  The plan shall include
measures to minimise construction related noise (including vibration), dust and
artificial lighting. 
Thereafter, the development will be carried out in accordance with the agreed
plan. 
Reason: In order that environmental emissions are considered and managed at
the construction phase, in order to protect local residents. 
7. The rating level of noise associated with the development on its own and/or in
combination with the development 23/00892/APP and 23/00894/APP, shall not
exceed the background sound level at the nearest noise sensitive dwelling which
is lawfully existing or has planning permission at the date of this permission.  The
background sound level for the daytime (0700 to 2300 hours) and night-time hours
(2300 to 0700 hours) associated with this consent has been identified within table
7 of the approved Noise Impact Assessment supporting document by Dice
Environmental Acoustics, dated 31st July 2023 Ref:101072-R01, Version 1 and
titled "Grissan, Portgordon Noise Impact Assessment". 
For the avoidance of doubt, the rating level and background sound level
associated with this condition are defined within BS 4142: 2014+A1:2019 Methods
for rating and assessing industrial and commercial sound.  The receptor locations
for the background sound levels (stated as R1 to R4 in the above document) are
identified in Section 1.2 of the Noise Impact Assessment supporting document by
Ensafe Consultants, dated 28th September 2022 and titled "Noise Impact
Assessment for Grissan Engineering Services Ltd At Portgordon (West).
Document reference N 80109-1R1". 
Reason: In order that noise from the development is controlled so as not to cause
noise nuisance to local residents.
Page 85

Page 86

8. No development shall commence until a Community Wealth Building Plan has
been submitted to and approved in writing by the Council as Planning Authority.
This plan shall include measures, targets and monitoring for the following areas as
appropriate;  
(a)    improving community resilience, reducing inequalities and maximising local
job creation;
(b)    increasing spending within communities and ensuring the maximum use of
local supply chains and services;
(c)    creation of new firms; and
(d)    enabling community ownership of buildings and infrastructure. 
The measures and monitoring shall thereafter be implemented in accordance with
the plan unless otherwise agreed in writing with the Council, as Planning
Authority. 
Reason:  To support a new strategic approach to economic development that
helps to build a wellbeing economy in accordance with National Planning
Framework 4 Policy 25 - Community Wealth Building. 
9. All planting and siting of bat and bird boxes as shown on the approved
landscaping plan (submitted 1/9/23 drawing number 149101/8001) shall be
undertaken in the first planting season following completion/occupation of the
development.  Any plants which, within a period of five years from the
completion/occupation of the development die, are removed, or become seriously
damaged or diseased, shall be replaced in the immediately following planting
season with others of a similar size and species.  
Reason: In order to ensure an acceptable level of planting in the interests of the
overall appearance and biodiversity levels within the site.   
10. Prior to development commencing, all tree protection measures as detailed in the
Tree Report by Forres Tree Services submitted in support of this planning
application shall be put in place and the development shall be carried out in
accordance with the good practice guidance contained within the Tree Report.   
Reason: To protect the root systems of the trees which bound the site to the
south.   
11. All surface water drainage provision within the development shall be implemented
in accordance with the details contained in the 'Drainage Impact Assessment, by
Fairhursts, dated August 2023, document number 149101-DA-01_Rev2. 
submitted in support of this proposal.  The development hereby approved shall not
be brought into use until it is connected to the approved drainage arrangements. 
Reason: To ensure surface water from the house is disposed of in a sustainable
manner. 
12. The development shall be carried out in accordance with the mitigation measures
contained within the Preliminary ecology appraisal survey report dated 28 August
2023, Ref: WTTPEA23-07, submitted in support of this planning application. 
Page 86

Page 87

Reason: To ensure the development is carried out as sensitively as possible to
minimise impact on the surrounding natural environment. 
13. Prior to the development commencing details of the operational site lighting shall
be submitted to and agreed in writing by the Planning Authority, in consultation
with the Environmental Health Manager.  Thereafter, the agreed lighting details
shall be maintained throughout the lifetime of the development. 
Reason: To protect residents from light nuisance due to the use of the
development. 
14. A construction phase surface water management plan shall be submitted a
minimum of two months prior to the commencement of the development and shall
be agreed in writing prior to work commencing with the Planning Authority in
consultation with Moray Flood Risk Management.  The plan shall include
measures to prevent increased flood risk and to ensure heavily silted surface
water does not enter any watercourse. 
Thereafter the development shall be carried out in accordance with the agreed
details. 
Reason: To prevent surface water flooding during the course of the development
and minimise risk to adjacent watercourses. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal accords with the provisions of the development plan and there are no
material considerations that indicate otherwise. The development is in keeping with and
does not expand the existing complex of buildings and structures at Portgordon to an
unacceptable level, sitting within lower land and a discrete location. The benefits in
terms carbon savings and use of spend distillery bi-product support various aims within
National Planning Framework 4 and Moray Local Development 2020. 
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
A Building Warrant will be required for the proposals. Should you require further
assistance please contact the Building Standards Duty Officer between 2pm and
4pm or telephone on 03001234561.  No appointment is necessary. Alternatively
e-mail buildingstandards@moray.gov.uk. 
THE TRANSPORTATION MANAGER has commented that:- 
Before commencing development the applicant is obliged to apply for permission
to modify the existing public road, in accordance with Section 56 of the Roads
Page 87

Page 88

(Scotland) Act.  The applicant will be required to provide technical information,
including drawings and drainage calculations, a programme for the proposed
works. Advice on the application process can be obtained by emailing
transport.develop@moray.gov.uk. 
Construction Consent shall include a CCTV survey of all existing roads drainage
to be adopted and core samples to determine the construction depths and
materials of the existing road.  The requirement for a Road Safety Audit for the
modifications to the existing public road will be determined through the Roads
Construction Consent process or subsequent to the road construction prior to any
road adoption. 
Planning consent does not carry with it the right to carry out works within the
public road boundary and the applicant is obliged to contact the Transportation
Manager for road opening permit in accordance with the Roads (Scotland) Act
1984.  This includes any temporary access joining with the public road. 
If required, street furniture which needs to be repositioned will be at the expense
of the developer. In addition any existing roadside ditch may require a pipe or
culvert. Advice on these matters can be obtained by e-mailing
transport.develop@moray.gov.uk.  
No building materials/scaffolding/builder's skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall ensure that their operations do not adversely affect any Public
Utilities, which should be contacted prior to commencement of operations. 
The applicants shall free and relieve the Roads Authority from any claims arising
out of their operations on the road or extension to the road. 
The Transportation Manager must always be contacted before any works
commence.  This includes any temporary access, which should be agreed with the
Roads Authority prior to work commencing on it. 
THE REGIONAL ARCHAEOLOGIST, has commented that:- 
Works by archaeological organisation 
Any archaeological survey, watching brief or archaeological works required by a
condition attached to this planning permission must be undertaken by a suitably
qualified archaeological organisation. 
Written Scheme of Investigation (WSI) 
A written specification produced by the appointed Chartered Institute for
Archaeologists (CIfA) member archaeological contractor on behalf of the applicant
which outlines in detail the proposed scheme of archaeological investigation.  It
should detail what archaeological works will be carried out and how; how any
encountered archaeological remains will be dealt with; how any updates to the
WSI will be provided; the reporting process; and the potential for post-excavation
requirement. The WSI must be submitted to the planning authority for approval
Page 88

Page 89

before being implemented. The contents of the WSI must conform to the relevant
national and CIfA standards and guidance. 
THE ENVIRONMENTAL HEALTH MANAGER, DEVELOPMENT SERVICES, has
commented that:- 
All digestates, liquid and solid, from the site shall be produced and certified to
'PAS 110: Specification for whole digestate, separated liquor and separated fibre
derived from the anaerobic digestion of source-segregated biodegradable
materials.' 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
149101/0301  Location plan
149101/0050  Gas upgrader general arrangements
149101/0052  Grid entry unit general arrangement
149101/0302  Proposed site plan
149101/0304  Site sections
149101/0001 E Proposed overall site plan
149101/6000 Flooding and Drainage
149101/8001 Landscaping Plan 
Information to accompany decision: 
Drainage Impact Assessment, by Fairhursts, dated February 2023, document number
149101-DA-01. 
Tree Report by Forres Tree Services submitted in support of this planning application. 
Preliminary ecology appraisal survey report dated 28 August 2023, Ref: WTTPEA23-
07. 
Page 89

Page 90

Page 90

Page 91

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Land To The West Of Portgordon Maltings
Buckie
Planning Application Ref Number: 
23/00892/APP 23/00894/APP & 23/00895/APP
Location Plan
Applicant Name: 
Grissan Engineering Services Ltd
Page 91

Page 92

23/00892/APP—Location Plan
Page 92

Page 93

23/00892/APP—Site Plan
16/01664/APP
Page 93

Page 94

23/00894/APP—Location Plan
16/
Page 94

Page 95

23/00894/APP—Site Plan
16/
Page 95

Page 96

23/00895/APP—Location Plan
16/
Page 96

Page 97

23/00895/APP—Site Plan
16/
Page 97

Page 98

Overall Site Plan
16/
Page 98

Page 99

Photo Location plan
16/
Page 99

Page 100

Photo 1
16/
Page 100

Page 101

Photo 2
16/
Page 101

Page 102

Photo 3
16/
Page 102

Page 103

Photomontage — View South from A990 at Portgordon
16/
Page 103

Page 104

Photomontage — View South from A990 at Parkside Cottage
16/
Page 104

Page 105

PLANNING APPLICATION: 23/00892/APP,
23/00894/APP & 23/00895/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.   THE PROPOSAL 
•   This proposal is for the extension of an existing anaerobic digestion (AD)
plant which lies adjacent to Crisp Maltings at Portgordon.  The applicants
have advised that the development proposal has been divided into three
separate planning applications to comply with and benefit from the
Scottish Governments Green Gas Support Scheme Regulations 2021. 
Given that the three applications are directly adjacent to one and other
and effectively form three phases of one larger extension to the existing
AD plant, the cumulative impact of the development has been assessed
as a whole. This report covers all three planning applications but with
three separate recommendations. 
•   As a whole the development consists of the siting of six 32m diameter
digester tanks measuring 16.9m in height, four smaller ancillary tanks, two
measuring 12m in diameter and 14m in height and two at 8.5m in
diameter and 6m in height.  All the tanks are located within the proposed
containment bund, which consists of a 2.5m high concrete wall.  The
proposals also include, two draft bunkers for the delivery of draft into the
digesters, two adjacent draft silos, measuring 5m in diameter by 11.5m in
height, a control building measuring 19.6m by 10.4m  by 4.6m high for
employees to monitor the plant, a 10m tall flare, gas upgraders/entry units,
which resemble steel storage containers and are generally no more than
3m in height, and underground propane tank, site access turning and
parking for cars and Heavy Goods Vehicles (HGV)s, drainage swale and
SUDs basin and landscaping.  All of the tanks, buildings and plant are to
be finished in dark green to match the existing plant. 
•  For clarity, application 23/00892/APP relates to much of the infrastructure
such as control building, draff silos, gas upgrader, flare, drainage swale
and two of the larger digester tanks. 23/00894/APP relates to two other
larger digester tanks, gas upgrader and grid entry unit. 23/00895/APP –
hosts the final two large digester tanks, a gas upgrader and grid entry unit.
•   An extensive amount of supporting information has been submitted in
support of the proposals which in brief summary outlines that the proposal
is intended to compliment and run in the same manner as the existing AD
plant, which takes in distillery by-product (either draff, spent lees, pot ale
or pot ale syrup) from Speyside Distilleries, processes this in the digesters
to produce bio methane, which is then injected back into the national gas
grid via the injector on site.  Any waste from this process is then sold as
fertiliser or discharged via the existing sea outfall which is monitored by
SEPA.
Page 105

Page 106

•   On their existing site the applicants also have a biogas fuelling point which
fuels HGVs which run on the biogas produced on site.  The applicant has
outlined that it is their intension to operate all HGVs serving the site on
biogas, however, to date, due to supply chain issues with biogas HGVs it
has only been possible to obtain 26 HGVs. This should increase
significantly to approx. 300 HGVs by 2028.  In addition, the applicants
also have a combined heat and power unit on their existing site, which
can convert the biogas to heat and electricity, where the heat is used in
the digestion process and electricity is used to run the plant and can also
be exported to the national grid.  In terms of scale of production, the
proposed development will produce up to 12MW of renewable energy,
which is equivalent to powering approximately 18000 homes.
•    The applicants have provided a Preliminary Ecological Survey, Carbon
Impact Assessment, Tree Survey, Noise Impact Assessment, Landscape
and Visual Appraisal, Odour Assessment, Air Quality Assessment,
Community Wealth Building Plan, Transport Statement, Drainage
Assessment, Flood Risk Assessment and Planning Statement in support
of the proposals. 
2.   THE SITE 
•  The site as a whole covers an area of land just under 2 hectares and
consists of agricultural grazing land, which lies immediately to the west of
the existing grouping of industrial operations, including the existing AD
plant, Crisp Maltings and maturation warehousing which is presently
under construction.  To the south of the site lies a small belt of woodland
which surrounds the Core Burn.  To the west and north of the site is open
farmland. 
•  Access to the site is proposed via the main access which serves the
adjacent maltings, maturations warehousing and AD plant and will be
taken through the existing AD plant site. 
•  The site is not covered by any specific designation within Moray Local
Development Plan, nor does it lie within any national or local
environmental designation and is not classified as prime agricultural land. 
According to the SEPA flood maps the southern portion of the site is
subject to flood risk from the Core Burn. 
•  The nearest residential properties lie 370m to the northwest at Mains of
Tannachy, 440m to the north east at Parkside Cottage and 465m to the
south at Windsoer. 
3.   HISTORY 
22/01321/SCN – Environmental impact assessment screening opinion issued
confirming that this proposal does not constitute EIA development. 
Page 106

Page 107

There is no further planning history in relation to the proposed site, however,
the following is a summary of the recent planning history for land adjacent to
the site. 
16/00353/APP - Erection of anaerobic digestion facility granted planning
permission on 26 May 2016. 
17/01536/APP - Erection of anaerobic digestion facility (extension to that
granted via 16/00353/APP) granted planning permission on 14 December
2017. 
20/00247/APP - Construction of four anaerobic digestion tanks, three feedstock
tanks and associated infrastructure granted planning permission on 4
December 2020. 
21/01605/APP - Application to Phase the development of the Coreside
Anaerobic Digestion (AD) facility to demarcate the consented AD site into 2
phases with the addition of additional biomethane processing infrastructure
granted planning permission on 2 December 2021. 
22/01085/APP - Amend site layout as approved under reference 20/00247/APP
at Phase 1 Coreside anaerobic digestion facility granted planning permission
on 21 December 2022. 
22/01086/APP - Amend site layout approved under ref 21/01605/APP granted
planning permission on 20 December 2022. 
22/01269/APP - Erect storage warehouses and ancillary development (amenity
block sprinkler tank and pump house) land engineering (cut and fill),
realignment of Core Burn and associated engineering and infrastructure works
including access and sub-station granted planning permission on 20 December
2022. 
22/01401/HAZ - Hazardous Substance Consent in relation to adjacent existing
anaerobic digestion facility approved 29 November 2023. 
23/01441/HAZ - Hazardous Substance Consent in relation to adjacent
maturation warehousing approved 1 February 2024. 
4.   POLICIES 
National Planning Framework 4 
NPF1 - Tackling the climate and nature crises
NPF2 - Climate mitigation and adaptation
NPF3 - Biodiversity
NPF4 - Natural places
NPF5 - Soils
NPF6 - Forestry, woodland and trees
NPF7 - Historic assets and places
NPF11 - Energy
Page 107

Page 108

NPF12 - Zero waste
NPF13 - Sustainable transport
NPF14 - Design, quality and place
NPF18 - Infrastructure first
NPF22 - Flood risk and water management
NPF23 - Health and safety
NPF25 - Community wealth building
NPF26 - Business and industry 
Moray Local Development Plan 2020 
PP2 Sustainable Economic Growth
PP3 Infrastructure and Services
DP1 Development Principles
DP9 Renewable Energy
EP1 Natural Heritage Designation
EP2 Biodiversity
EP7 Forestry Woodland and Trees
EP8 Historic Environment
EP12 Management and Enhancement of the Water Environment
EP14 Pollution Contamination Hazards 
5.  ADVERTISEMENTS 
5.1  Advertised for neighbour notification purposes and as a development of a Class
specified in Schedule 3 of the Development Management Regulations 2013. 
6.  CONSULTATIONS 
Contaminated Land – No objections. 
Scottish Water – No objections. 
Transportation Manager – No objection subject to conditions and informatives
being attached to the consent.  The conditions relate to the widening of the
A990 at Bin View Terrace, leading down from the junction with the A98 and
require a construction traffic management plan. 
Archaeology – No objections, subject to condition relating to archaeological
investigation and recording of any finds.  Archaeological investigation is
ongoing on the site at present. 
SEPA – No objections in relation to flood risk following a review of the flood risk
assessment submitted in support of the application.  Also confirmed that the
proposed bund is considered to be appropriate for spillage containment and the
existing AD plant is a lower tier COMAH establishment where HSE & SEPA are
the joint Competent Authority. 
Moray Flood Risk Management – No objections subject to condition relating
to adherence with the submitted Drainage Impact Assessment. 
Page 108

Page 109

Environmental Health – No objections subject to conditions relating to
constructions activity, operating hours, site lighting, construction environmental
management plan and operational noise limits. 
Health and Safety Executive – No objections. 
Strategic Planning & Delivery – Comments provided in relation to
development plan policy on Climate change, Renewable energy, environment,
economy and infrastructure.     
7.   OBJECTIONS-REPRESENTATIONS 
None received. 
8.   OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. National Planning Framework 4
(NPF) and the adopted Moral Local Development Plan 2020 (MLDP) unless
material considerations indicate otherwise. 
8.2 The main planning issues are considered below: 
8.3 Environmental Impact Assessment
The applicants sought a screening opinion (22/01321/SCN) prior to the
submission of these planning applications, which concluded that the proposal
constitutes Schedule 2 development in relation to the Town and Country
Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. 
Taking into account the characteristics of the development including its nature
and scale, the location of the development, and the characteristics of its likely
potential impact, the proposal is considered unlikely to result in significant (and
complex) environmental effects and the proposal is not an EIA development. 
8.4 Principle of the development (NPF4 – 1, 2, 11, 26 MLDP- PP2, DP9)
Development plan policies strongly encourage proposals that involve the
production of green energy and the creation of circular economies.  Policies
also allow for the extension of existing rural businesses, subject to ensuring the
proposal does not result in unacceptable visual impact, harm the environment
or neighbouring amenity levels and can be adequately served in terms of
infrastructure.  All of these aspects are discussed further below.   
8.5 In this case the proposed development will result in the production of significant
quantities of green energy from the processing of distillery by-product, with the
spent digestate being used as fertiliser to grow crops to thereafter be used in
the distilling industry completing the distilling circular economy.  The extending
of the existing AD operations allows the proposed development to take
advantage of existing infrastructure that is already in place.  The site is at a key
location in the distilling process, where feedstocks can be efficiently obtained
and the HGVs which are heavily utilised in the distilling process can be fuelled
Page 109

Page 110

whilst visiting the site.  Excess gas can also be used in the adjacent CHP plant
to help fuel the adjacent maltings with the remainder being used to boost the
national gas network, from the high-pressure gas injection point located within
the existing AD plant site. 
8.6 Overall the general principle of the proposal is welcomed, subject to ensuring
the key policy aspects outlined below are addressed. 
8.7 Climate Change (NPF4 – 1, 2, 11 MLDP- PP2, DP1, DP9)
Development plan policies aim to encourage, promote and facilitate
development that address the global climate and nature crisis and that
significant weight will be given to proposal that achieve this.   
8.8 In this case the applicants have provided a detailed carbon impact assessment,
which in very brief, simplified terms identifies that the purpose in of the existing
and proposed AD plants is to be a key factor in enabling the distilling sector in
Scotland to achieve its net zero aspirations by 2040.  The existing AD plant
offsets approximately 200,000 tonnes of CO2 emissions per year, which will
increase should this proposal gain consent. In terms of embodied carbon
associated with the construction of the proposed project, the calculations
provided detail that this will equate to around 2100 tonnes to establish this
development, which when compared to the operation of the existing and
proposed AD plant would take the equivalent of 5-7 days to off-set.  This is a
very short pay back period and highlights the significant contributions of the
existing and proposed plant in tackling climate change.     
8.9 In terms of the overall efficiency of the proposed plant, there are several
fundamental aspects of this site and the operation of the plant which contribute
towards the high efficiency and green credentials.  The location of the plant is
ideal for efficient delivery of distillery by-product from distilleries throughout
Moray, which minimises distances travelled by HGVs in the overall process. 
For the avoidance of doubt, confidential information has been by the applicants
which indicates the distilleries which provide by-product to the site and this give
confidence to the carbon calculations provided in support of the proposals. In
addition to this, the site has a feed into the high-pressure gas network on the
existing site and this avoids the need to transport gas off site with HGVs to
injection points elsewhere.  The existing site also contains a combined heat and
power (CHP) unit, which can convert the gas produced to electricity, which runs
the plant and can export to the national electricity grid, but also any waste heat
from this process is reused within the digestate heating process ensuring that
the CHP unit is efficient as possible.  The existing plant also contains a biogas
refuelling station for HGVs and with an expanding fleet of biogas trucks now
operating for the distilleries, this is another aspect of the existing site which
improves efficiency of the overall process.  Lasty the site has an existing long
sea outfall, which is monitored by SEPA, to ensure that any outfall is within
acceptable limits and that material pumped out of the outfall does not need to
be exported from the site via HGVs. This results in less use of HGVs in this
process. 
8.10 Whilst the above is a very simplistic summary of the carbon emissions and
climate change benefits of this proposal, it is a good indicator of the benefits the
proposals can have in addressing climate change.  With this in mind the
Page 110

Page 111

proposal is considered to be compliant with development plan policy in this
regard.   
8.11 Design, siting and landscape impact (NPF4 – 1, 2, 11, 14, 26 MLDP- PP2,
DP1, DP9)
In terms of siting, design and potential impact on the character of the area,
given the scale of the proposal it will inevitably be visible within the local
landscape. The applicants have submitted a landscape and visual appraisal in
support of the development which includes visualisations to aid the
understanding of the likely visual impact of the proposals.  The proposed
extension is located to the west of the existing AD plant, Crisp Maltings and
Maturation warehousing, which is a relatively low point in the landscape and
has the fewest public vistas.  In essence the existing industrial development to
the east of the site will largely screen the development from the east and taking
into account the natural undulation in the landscape and the presence of
intervening mature woodland, the proposals will not appear prominent in the
landscape from the north, south or west.   
8.12 Overall the proposal will therefore have minimal visual impact on the character
of the surrounding landscape.  The proposed flare (one already exists at the
existing nearby AD plant) would be 10m high structure and would not be in
regular use.  For AD plants, such flares are a safety feature and are only used
on rare occasions where there is an excessive of pressure gas. 
8.13 Protected species, landscaping, biodiversity, soils (NPF4 – 1, 2, 3, 4, 5, 6,
14 11 MLDP- PP2, DP1, DP9, EP1, EP2, EP7)
NPF 4 Policy 3 Biodiversity states that developments should contribute to the
enhancement of biodiversity, and MLDP policy EP2 Biodiversity states that “all
development proposals must, where possible, retain, protect and enhance
features of biological interest and provide for their appropriate management.”
As the site is comprised of worked agricultural land, there is currently limited
biodiversity to enhance. Therefore, the planting, green and blue drainage
solutions proposed would see an enhancement, albeit where the confines of
the site and nature of the development gives limited opportunity for in site
biological enhancement. 
8.14 Set out in the landscaping plan, native hedging is proposed along the northern
boundary of the site and surrounding the proposed SUDs and swale area to the
south of the site this would consist of a mix of hazel, hawthorn, holly,
blackthorn, grey willow, elder, gorse and guelder rose.  A coastal meadow mix
is proposed in the drier open areas surrounding the SUDs, with a wetland mix
proposed within the swale and SUDs areas.  Bird and bat boxes are proposed
to be located within the existing mature trees adjacent to the SUDs area.   
8.15 A tree survey and tree protection plan has been carried out in support of the
application and also covers the trees which lie outwith the site boundary to the
south of the site.  This identifies that the development will not have an adverse
impact on any healthy trees and proposes protection measures to ensure they
are protected throughout the construction process.  For the avoidance of doubt
the tree survey plan identifies a small number of trees outwith the site boundary
which the arboriculturlist has confirmed should be removed due to disease or
poor condition etc.  However, whilst the tree survey advises that they should be 
Page 111

Page 112

removed as these are outwith the application site the applicant’s have
confirmed that these will remain. In terms of screening the tree line following
the Core Burn running south of the site, provides the necessary enclosure from
much of the views from the south. 
8.16 Bearing in mind this proposal will result in significant carbon emissions savings
and will act to combat climate change, the proposals will result in overriding
environmental benefits and when coupled with the measures identified above
the proposals are considered to be compliant with development plan policy in
this regard.  The site is not designated as prime agricultural land so would not
conflict NPF Policy 5 Soils or local policy EP16 Geodiversity and soils
Resources. 
8.17 Noise, odour & light pollution (NPF4 – 11, 14, 23 MLDP- DP1, DP9, EP14)
Development plan policies outline that proposals should not adversely affect
surrounding amenity including from noise, odour or light pollution.  The
applicants have submitted noise, odour and air quality impact assessments to
inform this matter.   
8.18 The Environmental Health Manager has assessed this information and has
raised no objection to the grant of permission subject to conditions controlling
operating hours, lighting, noise levels, construction work hours and submission
of a Construction Environmental Management Plan to control/manage
environmental emissions (noise, vibration, dust and artificial lighting) during the
construction phase. 
8.19 Subject to the compliance with above conditions the proposal would accord
with development plan policy. 
8.20 Drainage and flood risk (NPF4 - 22 MLDP- EP12)
Development plan policies set out detailed criteria to ensure proposals meet
siting, design and servicing requirements including provision of SuDS. This
includes requirements for surface water from new development to be dealt with
in a sustainable manner that has a neutral effect on the risk of flooding, or
which reduces the risk of flooding. 
8.21 A Drainage Impact Assessment and Flood Risk Assessment has been
submitted with the application which details the proposed surface drainage
arrangements for the proposed development and outlines that the site is not at
risk of flooding, nor will the development exacerbate flood risk elsewhere.  The
applicants have outlined that they will utilise rainwater harvesting within the
bunded area of the site and re-use this captured rain water within the digestion
process.  Any surface water falling outwith the bunded area will be directed
towards the proposed swale and SUDs basin located to the south of the site
adjacent to the Core Burn/existing woodland and will act to form a wetland area
which should enhance habitat and biodiversity. 
8.22 In terms of foul drainage the drainage assessment submitted in support of the
application details that a small treatment plant will be installed with partial
soakaway and attenuated discharge to the Core Burn, all of which is
considered acceptable. 
Page 112

Page 113

8.23 Both SEPA and Moray Flood Risk Management have been consulted on the
proposals and have raised no objection subject to the conditions as
recommended. With this in mind, the proposals are considered compliant with
development plan policies.   
8.24 Access (NPF4 – 13 MLDP- PP3, DP1)
Local Development plan policy DP1 requires that proposals must provide a safe
entry and exit from the development and conform with current policy on parking
standards.  Development plan policy requires development to be planned and
co-ordinated with infrastructure to ensure that places function properly and
proposals are adequately served by infrastructure and services. 
8.25 A Transport Statement has been submitted in support of the proposals and the
Transportation Section has been consulted and raised some concerns
regarding the impact of HGV traffic from the proposal on the A990 up to the
A98.  Following detailed discussions, it has been agreed with the applicants
that they will upgrade/widen a portion of the A990 adjacent to Bin view Terrace
and a condition has been recommended to this affect as well as a construction
traffic management plan to be submitted and agreed in writing prior to
construction commencing.   Subject to these conditions the Transportation
Service has no objection to the application and as such the proposal is
considered compliant with development plan policy. 
8.26 Historic Environment (NPF4 – 7 MLDP- EP8)
The proposal is considered to have sufficient separation from any built heritage
features within the surrounding landscape to ensure there is no adverse impact
in this regard.  Following consultation with the Regional Archaeologist, they
have confirmed no objection to the approval of the development, subject to a
condition being applied to ensure a programme of archaeological works is
carried out prior to any development works commencing. 
8.27 The proposals are therefore considered compliant with development plan
policies. 
8.28 Zero waste (NPF4 – 12 MLDP- PP3)
Development plan policy seeks to reduce the waste of materials in construction
and requires waste management plans for developments that will generate
waste. 
8.29 In this case the proposed plant is a specifically designed project whereby each
aspect of the design is fundamental in the operation of the plant.  Following the
construction of other similar facilities in the past, the detailed design of the
plants has been revised to ensure efficient operation and minimisation of waste. 
With this in mind, the waste associated with the construction of the proposed
plant will be minimal.   
8.30 In terms of operations waste, the whole ethos of the project is to take a bi-
product from the distilling industry to produce fuel.  The manner in which this is
achieved within the AD plant ensures that all aspects of the energy produced
on site is used, for example in the combined heat and power plant, electricity is
generated from the burning of the gas, however, where often the heat from the
Page 113

Page 114

process is wasted, in this case, the digesters use the heat, ensuring the
processes are as efficient as possible and minimise waste. 
8.31 The existing and proposed AD plants provide a key link in ensuring the distilling
industry can be come a circular process minimising waste production and as
such the proposal is development plan policy requirements in this regard. 
8.32 Community Wealth Building (NPF4 – 25)
Development plan policies proposals that contribute to local or regional
community wealth building strategies and those that are consistent with local
economic priorities.  This concept is expanded on further with guidance
adopted by this committee on 30 May 2023. 
8.33 In this case, the applicants have provided a Community Wealth Building Plan,
which outlines that the distilling industry is a key sector of the Moray economy,
employing a significant number of local people, both directly and indirectly.  The
greening of the distilling industry and net zero aims are fundamental to the
successful future of the industry.  To this end, the existing and proposed plant
provide a method of achieving this aim and preserving the future of this key
sector of the Moray economy. 
8.34 In terms of benefits to the local environment, the AD process avoids direct
discharge of distilling by-product to watercourses and direct spreading on fields,
however, still results in a nutrient rich by-product, which is used by local
farmers to grow crops.  In time, once all of the planned bio-methane HGV
vehicles are in operation, this will result in a significant reduction in emissions
from HGVs around Moray again benefiting the local population.   
8.35 Whilst the above provides a quick summary of the overarching community
benefits of the proposals, the council guidance seeks a more detailed
breakdown of the benefits of proposals. 
8.36 To this end the applicants have identified throughout their design and
construction processes where they use local businesses, contractors and
materials where possible.  In terms of the operation of the proposed plant there
will be 4 full time equivalent posts created along with maintenance and repair
contracts for local businesses where required on an ongoing basis.  In addition
to this the applicants also engage with local schools providing presentations on
the science and engineering surrounding the AD process.  Both the applicants
and their parent company William Grant and Sons offer graduate development
programs as part of our operations and project engineering staff recruitment
plans. 
8.37 Following consideration from the Community Wealth Building officer, the
proposed plan is considered to be a good start, however, further detail is
needed on apprenticeships, skills development opportunities, supporting
communities that are impacted by the development, experteering/mentoring to
community groups.  Considering Community Wealth Building is a relatively new
field in planning and its integration with the proposed AD plant extension is
difficult to fully cover at this early stage in the project, it is recommended that a
condition be applied to the consent to ensure these aspects can be fully
expanded upon and agreed prior to the development commencing.  Subject to
Page 114

Page 115

this condition as recommended the proposal is considered to be compliant with
development plan policy.   
Conclusion
Overall the proposed extensions to the existing AD plant are considered to
result in an acceptable level of impact on the character, appearance and
amenity of the surrounding countryside, whilst making significant contributions
toward minimising carbon emissions, greening the distilling industry and
combating climate change and as such the proposal is recommended for
approval.   
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal accords with the provisions of the development plan and there
are no material considerations that indicate otherwise. The development is in
keeping with and does not expand the existing complex of buildings and
structures at Portgordon to an unacceptable level, sitting within lower land and
a discrete location. The benefits in terms carbon savings and use of spend
distillery bi-product support various aims within National Planning Framework 4
and Moray Local Development 2020. 
Author/Contact
Officer:
Iain T Drummond          
Planning Officer
Ext: 01343 563607 
Beverly Smith
Development Management & Building Standards Manager 
Page 115

Page 116

Page 116

Page 117

WARD 02_17 
23/01848/APP
19th October 2023
Section 42 of the Town and Country Planning (Scotland)
Act 1989 to amend condition 18 of planning permission
18/01046/EIA to amend construction working hours From
Within The Vicinity Of Redhythe Point In Aberdeenshire
Council Area To Whitehillock Farm Keith Moray 
for Moray Offshore Wind Farm (West) Limited 
Comments: 
 Advertised for neighbour notification purposes.
 3 objections/representation received.
 Referred to committee as the Section 42 relates to a National Development. 
Procedure: 
 None. 
Recommendation 
Grant Planning Permission - Subject to the following:- 
1. The development to which this permission relates must be begun not later than the
expiration of 3 years beginning with the date on which the permission is granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act 1997
as amended. 
2. Construction works associated with the development audible at any point on the
boundary of any noise sensitive dwelling shall be permitted between 0700 – 1900
hours, Monday to Sunday (including National Holidays). No construction works
shall be undertaken during any other times except where previously agreed in
writing with the Council, as Planning Authority and where so demonstrated that
operational constraints require limited period of construction works to be
undertaken out with the permitted/stated hours of working. 
Reason: In order to minimise the impact of construction works on the amenity of
the surrounding area including local residents. 
Item 6.
Page 117

Page 118

Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposed Section 42 variation to vary condition allowing for longer construction
working hours  will accord with the relevant aims and policies of the National Planning
Framework 4 and Moray Local Development Plan 2020.   
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description  
Location plan 
Page 118

Page 119

WARD 02_17 
23/01851/APP
19th October 2023
Section 42 of the Town and Country Planning (Scotland)
Act 1997 to amend condition 7 of planning permission
reference 21/01402/AMC, to amend working hours From
The Vicinity Of Redhythe Point In Aberdeenshire Council
Area To Whitehillock Farm Keith Moray AB55 5PH
for Moray Offshore Windfarm (West) Ltd 
Comments: 
 Advertised for neighbour notification purposes.
 3 objections/representation received.
 Referred to committee as the Section 42 relates to a National Development. 
Procedure: 
 None. 
Recommendation 
Grant Planning Permission - Subject to the following:- 
Conditions/Reasons 
1. Notwithstanding the submitted details, prior to the commencement of any
development, a detailed Phasing Plan, Access Strategy and detailed Construction
Programme for the development shall be submitted to and approved by the
Council, as Planning Authority in consultation with the Roads Authority. The
Phasing Plan Access Strategy and Construction Programme shall include the
details of all proposed routes for construction traffic and abnormal load deliveries
and the locations of all proposed access points on the public road network, along
with the timing of works at each location on the cable route. 
Thereafter, all works shall be completed in accordance with the approved Phasing
Plan and Construction Programme. 
Reason: In order to ensure that the matters specified can be fully considered prior
to the commencement of development. 
2. The planning permission hereby granted for the proposed development shall be
carried out only in accordance with the approved Phasing Plan permitted by
Condition 1 and the details, including detailed drawings (and other supporting
information), shall previously have been submitted to and approved by the
Council, as Planning Authority in consultation with the Roads Authority in line with
Page 119

Page 120

the matters specified for that phase of the development. These drawings and
details shall show the matters specified in Conditions 3 and 4 below. 
Reason:  In order that detailed consideration can be given to the matters
specified prior to the works commencing on each phase of the development. 
3. In pursuance of Condition 2 above, for each phase of the development for which
details are to be submitted for approval, the required details shall be: 
a)  Detailed drawing of the proposed temporary access routes for the phase and
details of the number and size of construction vehicles using the access
routes for that phase of development;
b)  Detailed drawings of the improvements required to the public roads utilised
by construction traffic and any abnormal load deliveries for the phase, which
shall include but not be limited to the provision of new passing places, road
widening and edge strengthening, all on ground over which the applicant has
or can obtain control at location(s) and constructed in accordance with Moray
Council specification; 
c)  Detailed drawings of the proposed access locations onto the public road for
construction vehicles for the phase, including the required visibility splays,
access specification and construction details, details of all earthworks and
drainage provision and/or drainage diversion, details of proposed
fencing/gates, signage and any required temporary traffic management,
along with details of reinstatement works for any temporary access; 
d)  Details of the locations of all cable and haul road crossings within that phase
of the development and the proposed works associated with the crossings,
including but not limited to, the means of cable crossing e.g. directional
drilling or open trench, means of access to works areas, details of the haul
road crossings and any required temporary traffic management, and details
of required reinstatement works; 
e)  Details of diversion routes for local footpaths during the construction period
and associated signage (to be agreed with the Access Manager); 
f)  Detailed drawings of the locations of all cable joint access points, including
their proximity to the public road and any public road drainage, and details of
any temporary fencing or other measures to protect the users of the public
road during the construction period; 
g)  A Construction Traffic Management Plan (CTMP), the details of which must
include, parking provision for staff and loading/unloading, provision for the
prevention of material being deposited onto the public road including wheel
cleaning and for road sweeping at construction access(es) to the public road,
a programme for monitoring and provisions for interim maintenance to be
undertaken to ensure safe and suitable access is maintained for the
construction access routes for the duration of the works will be required; and
h)  'Before' road condition video and joint surveys. Thereafter, all works shall be
completed in accordance with the approved details and with the Construction
Traffic Management Plan. 
Reason: In order to ensure that the matters specified can be fully considered prior
to the commencement and to ensure acceptable infrastructure to enable access to
the development and development that does not create any hazard to road users
in the interests of road safety. 
Page 120

Page 121

4. In pursuance of Condition 2 above, for each phase of the development where
there is a requirement for Abnormal Load deliveries for which details are to be
submitted for approval, the required details shall be: 
a)  A detailed survey of the Abnormal Load delivery route shall be carried out to
determine the locations of structures (e.g. bridges) and street furniture
affected by any construction and/or abnormal indivisible load vehicle
movements; 
b)  Road improvements/strengthening (either temporary or permanent) required
as a result of the survey prior to any movements of any construction and
abnormal load traffic shall be completed; c) Abnormal Load Traffic
Management Plan, details of which must include the methods of dealing with
large and/or abnormal delivery vehicles, vehicle swept path analysis and the
methods of marshalling and manoeuvring at junctions on the public road
network; and
c)  Evidence of the completion of an Abnormal load trial run(s) undertaken for
the delivery route. Representatives from the Moray Council Transportation
(Traffic), the Trunk Road Authority, Police Scotland and any other roads
authorities where roads will form part of the route of the delivery must be
invited to the trial run. 
Thereafter, all works associated with the Abnormal Load Deliveries shall be
completed in accordance with the approved details and the Abnormal Loads
delivered in accordance with the Traffic Management Plan. 
Reason: In order to ensure that the matters specified can be fully considered prior
to the commencement and to ensure acceptable infrastructure to enable access to
the development and development that does not create any hazard to road users
in the interests of road safety. 
5. Prior to commencement of development on any phase of the development, the
following shall be submitted to and approved by the Council, as Planning Authority
in consultation with the Roads Authority: a. Evidence to confirm that a Section 96
'Wear and Tear' Agreement has been completed and agreed by the developer or
their representative and the local Roads Authority, including a commitment to the
undertaking of joint 'before' and 'after' road condition surveys, to ensure that the
costs of works to repair damage to the public road as a result of construction
traffic on the roads identified in Condition 1 will be met. 
Reason: To ensure that any adverse impact on the condition of the public road,
including roadside verges, attributable to the development traffic is identified and
ameliorated. 
6. At the start and end of each phase (as per condition 1) 'before' and 'after'
condition video surveys of the proposed delivery and construction traffic routes
shall be undertaken jointly with the Roads Authority and a copy of the survey
provided to the Planning and Roads Authority. 
Reason: To ensure that any adverse impact on the condition of the public road,
including roadside verges, attributable to the development traffic is identified and
ameliorated. 
Page 121

Page 122

7. Construction works associated with the development audible at any point on the
boundary of any noise sensitive dwelling shall be permitted between 0700 – 1900
hours, Monday to Sunday (including National Holidays). No construction works
shall be undertaken during any other times except where previously agreed in
writing with the Council, as Planning Authority and where so demonstrated that
operational constraints require limited period of construction works to be
undertaken out with the permitted/stated hours of working. 
Reason: In order to minimise the impact of construction works on the amenity of
the surrounding area including local residents. 
8. The developer shall implement in full the management, monitoring and mitigation
provisions contained within the Construction Environmental Management Plan
(CEMP) supporting document as they pertain to noise, vibration, dust, air quality
and artificial lighting. For the avoidance of doubt, the supporting document is titled
"Moray Offshore Wind Farm (West) Limited. OnTI Cable Route CEMP. Dated 3rd
September 2021, Revision : 02. Document Name : 8460005-DAD-MWW- REP-
000006." as approved under 21/01402/AMC permitted on 2 March 2022. 
Reason: In order to ensure the development minimises nuisance and disturbance
to neighbouring properties. 
9. The development must be carried out in accordance with the Private Water
Supply Risk Assessment submitted in December 2021 inclusive of the proposed
monitoring and mitigation. Where a supply is adversely affected by the works,
short-term contingency arrangements shall be implemented and, where
necessary, a permanent replacement adequate and wholesome supply shall be
provided, e.g. connection to the public mains or provision of an alternative supply.
The cost of short terms contingency arrangements, repair and if necessary,
replacement costs for affected water supplies must be met by the applicant. 
Reason: To ensure that an adequate and wholesome water supply to existing
properties is maintained. 
10. The development shall be carried out in full accordance with the approved Written
Scheme of Investigation (WSI) (OnTI Cable Route Written Scheme of
Investigation 8460005-DAD-MWW-REP-000003 Revision 02, dated 3/9/21)
submitted in relation to condition 24 of application 18/01046/EIA and that the
programme of archaeological works as set out in the WSI is to be carried out in
accordance with the approved Written Scheme of Investigation. Should the
archaeological works reveal the need for post excavation analysis the
development hereby approved shall not be brought into use unless a post-
excavation research design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the planning authority. The PERD shall be carried out in
complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. 
Page 122

Page 123

11. The approval of conditions granted is upon the basis that subject to the further
conditions above (including those seeking modification and final detailed
design/layouts for the CTMP) the mitigation and all other measures contained
within the Cable Route Mitigation Statement, Cable Route Phasing Plan and
Landscape Plan are fully complied with. 
Reason: To ensure the ecology and environment of the surrounding areas are
protected during construction works and to ensure the tree protection and targeted
tree felling is complied with. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposed Section 42 variation to vary conditions allowing for longer construction
working hours (subject the compliance with existing conditions relating to Construction
Environmental Management Plans hereby repeated) will accord with the relevant aims
and policies of the National Planning Framework 4 and Moray Local Development Plan
2020.   
List of Informatives: 
TRANSPORT SCOTLAND has commented that:- 
The applicant should be informed that the granting of planning consent does not
carry with it the right to carry out works within the trunk round boundary and that
permission must be granted by Transport Scotland Roads Directorate. Where any
works are required on the trunk road, contact details are provided on Transport
Scotland's response to the planning authority which is available on the Council's
planning portal. Trunk road modification works shall, in all respects, comply with
the Design Manual for Roads and Bridges and the Specification for Highway
Works published by HMSO. The developer shall issue a certificate to that effect,
signed by the design organisation. 
Trunk road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation. 
The road works which are required due to the above Conditions will require a
Road Safety Audit as specified by the Design Manual for Roads and Bridges. 
Any trunk road works will necessitate a Minute of Agreement with the Trunk
Roads Authority prior to commencement. 
THE TRANSPORTATION MANAGER, DIRECT SERVICES has commented that:- 
Prior to the commencement of deliveries or construction activity, a Section 96
Agreement under the Roads (Scotland) Act 1984 will be required to be approved
Page 123

Page 124

between the developer and the Roads Authority. This is to ensure that the costs to
repair any damage to the public roads as a result of the construction work traffic
are met by the applicant. 
Planning consent does not carry with it the right to construct a new road or any
part of a road. In accordance with Section 21 of the Roads (Scotland) Act 1984
Construction Consent for new roads (includes passing places, modified junctions
and footpaths) that will form part of the public road will be required. Advice on this
matter can be obtained by emailing transport.develop@moray.gov.uk and
reference to the following pages on the Council web site. 
Checklist: http://www.moray.gov.uk/downloads/file68812.pdf 
RCC and Specification: http://www.moray.gov.uk/moray_standard/page_65638.html 
Before commencing development, the applicant is obliged to apply for permission
to modify the existing public road, in accordance with Section 56 of the Roads
(Scotland) Act. The applicant will be required to provide technical information,
including drawings and drainage calculations, a programme for the proposed
works. Advice on the application process can be obtained by emailing
transport.develop@moray.gov.uk 
The applicant is obliged to apply for road opening permit(s) in accordance with
Section 85 of the Roads (Scotland) Act 1984. Advice on this matter can be
obtained by emailing roads.permits@moray.gov.uk and reference to the following
page on the Council web site Road Opening: 
http://www.moray.gov.uk/moray_standard/page_79860.html 
Public utility apparatus may be affected by this proposal. Contact the appropriate
utility service in respect of any necessary utility service alterations, which have to
be carried out at the expense of the developer. 
Any street furniture, which will need to be repositioned to enable the development,
including deliveries to the development, shall be at the expense of the developer.
Furthermore, any existing roadside ditch, which requires relocating, a pipe or
culvert shall be agreed in advance of any works commencing at that location.
Advice on these matters can be obtained by emailing road.maint@moray.gov.uk 
The developer shall be responsible for any necessary diversion of any utilities or
drainage present at the locations where works are to be undertaken. 
The developer shall meet all costs of improvements to the road infrastructure,
which are required as a result of the development, including any measures to
enable the use of structures on the public road for construction traffic and
abnormal load deliveries. 
The developer shall meet all costs of removal and re-erection of road signage,
which are required as a result of the delivery of the abnormal loads. 
Page 124

Page 125

The developer shall meet all costs of diverting any footpath or cycleway during the
construction period, including signage. 
The developer shall be responsible for ensuring that surface/ground water does
not run from the public road into the site. The developer shall free and relieve the
Roads Authority from any claims arising out of his operations on the road or
extension to the road. 
No retaining structures or embankments shall be constructed along the edge of
the road, whether retaining the public road or ground adjoining the public road
without prior consultation and agreement of the Roads Authority. Advice on the
retaining structures/embankments can be obtained by emailing
structures@moray.gov.uk 
The Transportation Manager must always be contacted before any works
commence. This includes any temporary access, which should be agreed with the
Roads Authority prior to work commencing on it. 
SCOTTISH WATER have commented as follows: 
A review of our records indicates that the proposed activity falls within a drinking
water catchment where a Scottish Water abstraction is located. Scottish Water
abstractions are designated as Drinking Water Protected Areas (DWPA) under
Article 7 of the Water Framework Directive. The River Deveron supplies Turriff
Water Treatment Works (WTW) and it is essential that water quality and water
quantity in the area are protected. In the event of an incident occurring that could
affect Scottish Water we should be notified immediately using the Customer
Helpline number 0800 0778 778. 
Scottish Water have produced a list of precautions for a range of activities. This
details protection measures to be taken within a DWPA, the wider drinking water
catchment and if there are assets in the area. Please note that site specific risks
and mitigation measures will require to be assessed and implemented. These
documents and other supporting information can be found on the activities within
our catchments page of our website at www.scottishwater.co.uk/slm 
The fact that this area is located within a drinking water catchment should be
noted in documentation. Also, anyone working on site should be made aware of
this during site inductions and we would also like to take the opportunity, to
request that 3 days in advance of any works commencing on site, Scottish Water
is notified at protectdwsources@scottishwater.co.uk so we can make our
operational teams aware there will be activity taking place in the catchment. 
THE SCOTTISH ENVIRONMENT PROTECTION AGENCY has commented that:- 
We note dewatering may be required and will be managed in line with CAR. As
such, any dewatering during excavations should be in compliance with CAR GBR
2 and GBR 15 (see SEPA's A Practical Guide:
https://www.sepa.org.uk/media/34761/car_a_practical_guide.pdf. Abstraction of
groundwater in quantities greater that 10m3/day will require a CAR registration or
Page 125

Page 126

licence depending on the scope and duration of the works. 
Further details of regulatory requirements and good practice advice, for example
in relation to private drainage, can be found on the regulations section of our
website. If you are unable to find the advice you need for a specific regulatory
matter, please contact a member of the local compliance team at:
gs@sepa.org.uk 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description  
Location plan 
Page 126

Page 127

WARD 02_17 
23/01852/APP
18th October 2023
Section 42 of the Town and Country Planning (Scotland)
Act 1997 to amend condition 4 of planning permission
reference 21/01561/AMC to amend construction working
hours From Within the Vicinity Of Redhythe Point In
Aberdeenshire Council Area To Whitehillock Farm Keith
Moray 
for Moray Offshore Windfarm (West) Ltd 
Comments: 
 Advertised for neighbour notification purposes.
 Referred to committee as the Section 42 relates to a National Development.
 No objections. 
Procedure: 
 None. 
Recommendation 
Grant Planning Permission - Subject to the following:- 
Conditions/Reasons 
1. Prior to energisation of either the Moray West substation or cables, evidence shall
be submitted to and approved in writing by Moray Council in consultation with
Scotland Gas Networks to demonstrate that an assessment of the potential effects
of inducing unacceptable levels of electrical alternating currents and voltage onto
the SGN A06 high pressure gas transmission pipeline and associated equipment,
has been carried out and a scheme of mitigation prepared to address any such
effects as may be identified by that assessment. 
Thereafter any mitigation identified as being required must be agreed in writing
with Moray Council and if required fully implemented in accordance with the
approved scheme of mitigation and be in place prior to energisation of either the
Moray West substation or cables unless otherwise agreed in writing with the
Moray Council in consultation with Scotland Gas Networks. 
Reason: In order to ensure a mechanism is in place to assess and mitigate the
effects of inducing alternating currents and voltage upon other utilities in the event
they arise. 
Page 127

Page 128

2. The development must be carried out in accordance with the Private Water
Supply Risk Assessment submitted in December 2021 inclusive of the proposed
monitoring and mitigation. Where a supply is adversely affected by the works,
short-term contingency arrangements shall be implemented and, where
necessary, a permanent replacement adequate and wholesome supply shall be
provided, e.g. connection to the public mains or provision of an alternative supply. 
Reason: To ensure that an adequate and wholesome water supply to existing
properties is maintained. 
3. The rating level of noise associated with the operation of the Moray West
Substation development shall not exceed the background sound level by more
than 5 dB (A) at any noise sensitive dwelling which is lawfully existing or has
planning permission at the date of this permission. For the avoidance of doubt, the
rating level and background sound level associated with this condition are defined
within BS 4142: 2014 Methods for rating and assessing industrial and commercial
sound. 
Reason: To protect local residents from noise nuisance due to the operation of
the Moray West Substation. 
4. Construction works associated with the development audible at any point on the
boundary of any noise sensitive dwelling shall be permitted between 0700 – 1900
hours, Monday to Sunday (including National Holidays). No construction works
shall be undertaken during any other times except where previously agreed in
writing with the Council, as Planning Authority and where so demonstrated that
operational constraints require limited period of construction works to be
undertaken out with the permitted/stated hours of working. 
Reason: In order to minimise the impact of construction works on the amenity of
the surrounding area including local residents. 
5. The developer shall implement in full the management, monitoring and mitigation
provisions contained within the Construction Environmental Management Plan
supporting document as they pertain to noise, vibration, dust, air quality and
artificial lighting. For the avoidance of doubt, the supporting document is titled
"Moray Offshore Wind Farm (West) Limited. OnTI Substation Construction
Environmental Management Plan. Dated 30th September 2021. Revision: 03
Document Name: 8460005-DAD-MWW- REP- 000014" as approved under
planning permission 21/01561/AMC on 21 February 2022. 
Reason: To ensure the construction phase is managed to prevent nuisance to
local residents. 
6. Unless otherwise agreed, the landscaping and compensatory planting shall be
carried out in accordance with the updated Substation Landscape Plan General
Arrangement Drawing number 201457_OPEN_MORW_SLP_SE01 Rev B. and
the details contained within the "Cable Route Tree Felling and Compensatory
Planting Summary Report Revision 2" submitted on 21 December 2021 and as
approved under 21/01561/AMC on 21 February 2022. The compensatory planting
must be undertaken no later than the first planting season following electrification
Page 128

Page 129

of the electricity substation (excluding any commissioning or testing of electrical
plant). If within the first 5 years of the development becoming operational, any
trees or shrubs die or are damaged, they must be replaced with a similar species
and height of plant. 
Reason: In order to ensure the appropriate landscaping and compensatory
landscaping takes place. 
7. If any design modifications are required to the design and layout of the electricity
substation compound beyond the layout hereby approved, these must first be
submitted to and approved by Moray Council in writing prior to electricity
substation compound being constructed. 
Reason: To ensure that any final design changes to the layout of the compound
are considered. 
8. Unless otherwise agreed with the Council, as Planning Authority the submitted
Construction Traffic Management Plan, Onshore Substation Phasing Plan,
Substation Layout Appearance and Lighting Plan and Substation Mitigation
Statement submitted under planning permission 21/01561/AMC on 21 February
2022 to purify the conditions stated above must be complied with in full. 
Reason: To ensure development is carried out sensitively and minimises the
impact of development activity in line with the mitigation and imbedded design
mitigation contained in the named documents. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposed Section 42 variation to vary conditions allowing for longer construction
working hours (subject the compliance with existing conditions relating to Construction
Environmental Management Plans hereby repeated) will accord with the relevant aims
and policies of the National Planning Framework 4 and Moray Local Development Plan
2020.   
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
A contribution has been made to the compensatory planting fund. 
TRANSPORT SCOTLAND has commented that:- 
The applicant should be informed that the granting of planning consent does not
carry with it the right to carry out works within the trunk round boundary and that
permission must be granted by Transport Scotland Roads Directorate. Where any
works are required on the trunk road, contact details are provided on Transport
Scotland's response to the planning authority which is available on the Council's
planning portal. 
Page 129

Page 130

Trunk road modification works shall, in all respects, comply with the Design
Manual for Roads and Bridges and the Specification for Highway Works published
by HMSO. The developer shall issue a certificate to that effect, signed by the
design organisation. 
Trunk road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation. 
The road works which are required due to the above Conditions will require a
Road Safety Audit as specified by the Design Manual for Roads and Bridges. 
Any trunk road works will necessitate a Minute of Agreement with the Trunk
Roads Authority prior to commencement. 
SCOTTISH WATER have commented that:- 
A review of our records indicates that the proposed activity falls within a drinking
water catchment where a Scottish Water abstraction is located. Scottish Water
abstractions are designated as Drinking Water Protected Areas (DWPA) under
Article 7 of the Water Framework Directive. The River Deveron supplies Turriff
Water Treatment Works (WTW) and it is essential that water quality and water
quantity in the area are protected. In the event of an incident occurring that could
affect Scottish Water we should be notified immediately using the Customer
Helpline number 0800 0778 778. 
Scottish Water have produced a list of precautions for a range of activities. This
details protection measures to be taken within a DWPA, the wider drinking water
catchment and if there are assets in the area. Please note that site specific risks
and mitigation measures will require to be assessed and implemented. These
documents and other supporting information can be found on the activities within
our catchments page of our website at www.scottishwater.co.uk/slm 
The fact that this area is located within a drinking water catchment should be
noted in documentation. Also anyone working on site should be made aware of
this during site inductions and we would also like to take the opportunity, to
request that 3 days in advance of any works commencing on site, Scottish Water
is notified at protectdwsources@scottishwater.co.uk so we can make our
operational teams aware there will be activity taking place in the catchment. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
8460005-DAA-ITP-MA-000005 Location plan 
Page 130

Page 131

WARD 02_17 
23/01853/APP
18th October 2023
Section 42 of the Town and Country Planning (Scotland)
Act 1997 to amend condition 7 of planning permission
reference 21/01391/APP to amend construction working
hours on Land Between Greenhill And Factors Park
Plantation Deskford Cullen Moray
for Moray Offshore Windfarm (West) Ltd 
Comments: 
• Advertised for neighbour notification purposes.
• Referred to committee as the Section 42 relates to a National Development.
• No objections. 
Procedure: 
 None. 
Recommendation 
Grant Planning Permission - Subject to the following:- 
Conditions/Reasons 
1. Notwithstanding the submitted details, prior to the commencement of any
development, a detailed Phasing Plan, Access Strategy and detailed Construction
Programme for the development shall be submitted to and approved by the
Council, as Planning Authority in consultation with the Roads Authority. The
Phasing Plan, Access Strategy and Construction Programme shall include the
details of all proposed routes for construction traffic and abnormal load deliveries
and the locations of all proposed access points on the public road network, along
with the timing of works at each location on the cable route. 
Thereafter, all works shall be completed in accordance with the approved Phasing
Plan and Construction Programme. 
Reason: In order to ensure that the matters specified can be fully considered prior
to the commencement of development. 
2. The planning permission hereby granted for the proposed development shall be
carried out only in accordance with the approved Phasing Plan permitted by
Condition 1 and the details, including detailed drawings (and other supporting
information), shall previously have been submitted to and approved by the
Page 131

Page 132

Council, as Planning Authority in consultation with the Roads Authority in line with
the matters specified for that phase of the development. These drawings and
details shall show the matters specified in Conditions 3 and 4 below. 
Reason: In order that detailed consideration can be given to the matters specified
prior to the works commencing on each phase of the development. 
3. In pursuance of Condition 2 above, for each phase of the development for which
details are to be submitted for approval, the required details shall be: 
a)  Detailed drawing of the proposed temporary access routes for the phase and
details of the number and size of construction vehicles using the access
routes for that phase of development;
b)  Detailed drawings of the improvements required to the public roads utilised
by construction traffic and any abnormal load deliveries for the phase, which
shall include but not be limited to the provision of new passing places, road
widening and edge strengthening, all on ground over which the applicant has
or can obtain control at location(s) and constructed in accordance with Moray
Council specification; 
c)  Detailed drawings of the proposed access locations onto the public road for
construction vehicles for the phase, including the required visibility splays,
access specification and construction details, details of all earthworks and
drainage provision and/or drainage diversion, details of proposed
fencing/gates, signage and any required temporary traffic management,
along with details of reinstatement works for any temporary access; 
d)  Details of the locations of all cable and haul road crossings within that phase
of the development and the proposed works associated with the crossings,
including but not limited to, the means of cable crossing e.g. directional
drilling or open trench, means of access to works areas, details of the haul
road crossings and any required temporary traffic management, and details
of required reinstatement works; 
e)  Details of diversion routes for local footpaths during the construction period
and associated signage (to be agreed with the Access Manager); 
f)  Detailed drawings of the locations of all cable joint access points, including
their proximity to the public road and any public road drainage, and details of
any temporary fencing or other measures to protect the users of the public
road during the construction period; 
g)  A Construction Traffic Management Plan, the details of which must include,
parking provision for staff and loading/unloading, provision for the prevention
of material being deposited onto the public road including wheel cleaning
and for road sweeping at construction access(es) to the public road, a
programme for monitoring and provisions for interim maintenance to be
undertaken to ensure safe and suitable access is maintained for the
construction access routes for the duration of the works will be required; and
h)  'Before' road condition video and joint surveys. Thereafter, all works shall be
completed in accordance with the approved details and with the Construction
Traffic Management Plan. 
Page 132

Page 133

Reason: In order to ensure that the matters specified can be fully considered prior
to the commencement and to ensure acceptable infrastructure to enable access to
the development and development that does not create any hazard to road users
in the interests of road safety. 
4. In pursuance of Condition 2 above, for each phase of the development where
there is a requirement for Abnormal Load deliveries for which details are to be
submitted for approval, the required details shall be: 
a)  A detailed survey of the Abnormal Load delivery route shall be carried out to
determine the locations of structures (e.g. bridges) and street furniture
affected by any construction and/or abnormal indivisible load vehicle
movements; 
b)  Road improvements/strengthening (either temporary or permanent) required
as a result of the survey prior to any movements of any construction and
abnormal load traffic shall be completed;
c)  Abnormal Load Traffic Management Plan, details of which must include the
methods of dealing with large and/or abnormal delivery vehicles vehicle
swept path analysis and the methods of marshalling and manoeuvring at
junctions on the public road network; and
d)  Evidence of the completion of an Abnormal load trial run(s) undertaken for
the delivery route. Representatives from the Moray Council Transportation
(Traffic), the Trunk Road Authority, Police Scotland and any other roads
authorities where roads will form part of the route of the delivery must be
invited to the trial run. 
Thereafter, all works associated with the Abnormal Load Deliveries shall be
completed in accordance with the approved details and the Abnormal Loads
delivered in accordance with the Traffic Management Plan. 
Reason: In order to ensure that the matters specified can be fully considered prior
to the commencement and to ensure acceptable infrastructure to enable access to
the development and development that does not create any hazard to road users
in the interests of road safety. 
5. Prior to commencement of development on any phase of the development, the
following shall be submitted to and approved by the Council, as Planning Authority
in consultation with the Roads Authority: 
a.  Evidence to confirm that a Section 96 'Wear and Tear' Agreement has been
completed and agreed by the developer or their representative and the local
Roads Authority, including a commitment to the undertaking of joint 'before'
and 'after' road condition surveys, to ensure that the costs of works to repair
damage to the public road as a result of construction traffic on the roads
identified in Condition 1 will be met. 
Reason: To ensure that any adverse impact on the condition of the public road,
including roadside verges, attributable to the development traffic is identified and
ameliorated. 
Page 133

Page 134

6. At the start and end of each phase (as per condition 1) 'before' and 'after'
condition video surveys of the proposed delivery and construction traffic routes
shall be undertaken jointly with the Roads Authority and a copy of the survey
provided to the Planning and Roads Authority. 
Reason: To ensure that any adverse impact on the condition of the public road,
including roadside verges, attributable to the development traffic is identified and
ameliorated. 
7. Construction works associated with the development audible at any point on the
boundary of any noise sensitive dwelling shall be permitted between 0700 – 1900
hours, Monday to Sunday (including National Holidays). No construction works
shall be undertaken during any other times except where previously agreed in
writing with the Council, as Planning Authority and where so demonstrated that
operational constraints require limited period of construction works to be
undertaken out with the permitted/stated hours of working. 
Reason: In order to minimise the impact of construction works on the amenity of
the surrounding area including local residents. 
8. The Construction Environmental Management Plan ("CEMP") shall be
implemented and maintained throughout the construction phase and in
accordance with the details provided in the supporting document, including
Appendices, by Moray Offshore Wind Farm (West) Limited and titled "OnTI Cable
Route Construction Environmental Management Plan, Document Name :
8460005-DAD-MWW-REP-000006 Revision:02, Status : Final, Date : 03-09-
2021". As approved under planning permission 21/01391/APP on 21 February
2022. 
Reason: In the interests of the amenity and environment of the surrounding area. 
9. No works in connection with the development hereby approved shall commence
unless an Archaeological Written Scheme of Investigation (WSI) has been
submitted to and approved in writing by the planning authority and a programme
of archaeological works has been carried out in accordance with the approved
WSI. The WSI shall include details of how the recording and recovery of
archaeological resources found within the application site shall be undertaken,
and how any updates, if required, to the WSI will be provided throughout the
implementation of the programme of archaeological works. Should the
archaeological works reveal the need for post excavation analysis the
development hereby approved shall not be brought into use unless a Post-
Excavation Research Design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the planning authority. The PERD shall be carried out in
complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. 
10. Prior to development commencing, detailed drawings and cross sections of any
above ground watercourse crossings, must be submitted to and approved in
Page 134

Page 135

writing by Moray Council, as Planning Authority in consultation with SEPA and
Moray Flood Risk Management. Thereafter the approved water course crossings
must be developed in accordance with the approved plans unless otherwise
agreed in writing with the Council, as Planning Authority. 
Reason: In order to ensure the finalised water crossing design can be given
further consideration and to ensure no detriment to the water environment or flood
risk occurs. 
11. The development shall be carried out in accordance with all mitigation measures
(including pre-development surveys) as identified in the OnTi Protected Species
Baseline Survey Report (doc. name: 8460005-DAD-MWW-REP-000005 rev: 2
dated 3 September 2021) and appendices approved under planning permission
21/01391/APP approved on the 21 February 2022. 
Reason: To ensure the ecology and environment of the surrounding areas are
protected during construction works. 
12. The compensatory planting as identified in the Cable Route Tree Felling and
Compensatory Planting Summary Report (doc. name: 8460005-DAD-MWW- REP-
000022 rev. 2 dated 21 December 2021) and appendices hereby approved under
planning permission 21/01391/APP on 21 February 2022 shall be provided in full
no later than the first planting season following the full electrification of the cable
route and substation. 
Reason: To ensure timeous delivery of the agreed compensatory tree planting. 
13. That within a period not less than 6 months prior to the cessation of operations, or
an alternative timeframe as agreed in writing by Moray Council, as Planning
Authority, a decommissioning plan is to be prepared in line with best practice at
the time of preparation and submitted for the written approval of Moray Council, as
Planning Authority in consultation with SEPA and Aberdeenshire Council. The
decommissioning of the development must thereafter be undertaken in
accordance with the approved decommissioning plan. 
Reason: To ensure provision is in place to facilitate a move towards a "Circular
Economy" and future proof the development against future environmental
requirements or considerations in the interests of the protection of the natural
environment. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposed Section 42 variation to vary conditions allowing for longer construction
working hours (subject the compliance with existing conditions relating to Construction
Environmental Management Plans hereby repeated) will accord with the relevant aims
and policies of the National Planning Framework 4 and Moray Local Development Plan
2020.   
Page 135

Page 136

List of Informatives: 
Comments from SCOTTISH WATER previously sent to the applicant under planning
permission 21/01391/APP approved on 21 February 2022. 
THE ENVIRONMENTAL HEALTH MANAGER, DEVELOPMENT SERVICES, has
commented that:- 
The Council has no record of private water supplies on the route of the proposed
development. However, it is possible that unregistered supplies are present. It is
recommended that a full assessment is made into the sources of water supply of
properties on and in the vicinity of the route of the proposed development, the
potential impact on these supplies and the need for mitigation. If private water
supplies are present, you should contact the Council's Environmental Health
section prior to starting works (tel 0300 1234561, email
environmentalhealth@moray.gov.uk). 
THE TRANSPORTATION MANAGER, DIRECT SERVICES has commented that:- 
Prior to the commencement of deliveries or construction activity, a Section 96
Agreement under the Roads (Scotland) Act 1984 will be required to be approved
between the developer and the Roads Authority. This is to ensure that the costs to
repair any damage to the public roads as a result of the construction work traffic
are met by the applicant. 
Planning consent does not carry with it the right to construct a new road or any
part of a road. In accordance with Section 21 of the Roads (Scotland) Act 1984
Construction Consent for new roads (includes passing places, modified junctions
and footpaths) that will form part of the public road will be required. 
Advice on this matter can be obtained by emailing
transport.develop@moray.gov.uk  and reference to the following pages on the
Council web site. 
Checklist: http://www.moray.gov.uk/downloads/file68812.pdf 
RCC and Specification:
http://www.moray.gov.uk/moray_standard/page_65638.html 
Before commencing development, the applicant is obliged to apply for permission
to modify the existing public road, in accordance with Section 56 of the Roads
(Scotland) Act. The applicant will be required to provide technical information,
including drawings and drainage calculations, a programme for the proposed
works. Advice on the application process can be obtained by emailing
transport.develop@moray.gov.uk   
The applicant is obliged to apply for road opening permit(s) in accordance with
Section 85 of the Roads (Scotland) Act 1984. Advice on this matter can be
obtained by emailing roads.permits@moray.gov.uk and reference to the following
page on the Council web site. 
Page 136

Page 137

Road Opening: http://www.moray.gov.uk/moray_standard/page_79860.html 
Public utility apparatus may be affected by this proposal. Contact the appropriate
utility service in respect of any necessary utility service alterations, which have to
be carried out at the expense of the developer. 
Any street furniture, which will need to be repositioned to enable the development,
including deliveries to the development, shall be at the expense of the developer.
Furthermore, any existing roadside ditch, which requires relocating, a pipe or
culvert shall be agreed in advance of any works commencing at that location.
Advice on these matters can be obtained by emailing road.maint@moray.gov.uk 
The developer shall be responsible for any necessary diversion of any utilities or
drainage present at the locations where works are to be undertaken. 
The developer shall meet all costs of improvements to the road infrastructure,
which are required as a result of the development, including any measures to
enable the use of structures on the public road for construction traffic and
abnormal load deliveries. 
The developer shall meet all costs of removal and re-erection of road signage,
which are required as a result of the delivery of the abnormal loads. The
developer shall meet all costs of diverting any footpath or cycleway during the
construction period, including signage. 
The developer shall be responsible for ensuring that surface/ground water does
not run from the public road into the site. 
The developer shall free and relieve the Roads Authority from any claims arising
out of his operations on the road or extension to the road. 
No retaining structures or embankments shall be constructed along the edge of
the road, whether retaining the public road or ground adjoining the public road
without prior consultation and agreement of the Roads Authority. Advice on the
retaining structures/embankments can be obtained by emailing
structures@moray.gov.uk 
The Transportation Manager must always be contacted before any works
commence. This includes any temporary access, which should be agreed with the
Roads Authority prior to work commencing on it. 
THE SCOTTISH ENVIRONMENT PROTECTION AGENCY has commented that:- 
Any watercourse crossings should be designed in accordance with SEPA's
Engineering in the water environment: good practice guide River crossings
https://www.sepa.org.uk/media/151036/wat-sg-25.pdf and following Engineering
advice webpage http://www.sepa.org.uk/regulations/water/engineering/ 
Page 137

Page 138

THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has
commented that:- 
A developer obligation has been paid against this consent relating to
compensatory tree planting. 
LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
8460005-DAA-ITP-MAP-000004 Location plan 
Page 138

Page 139

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance.
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
From within The Vicinity Of Redhythe Point In
Aberdeenshire Council Area To Whitehillock
Farm 
Planning Application Ref Number: 
23/01848/APP 23/01851/APP 23/01852/APP
23/01853/APP
Location Plan  - 18/01046/EIA
Applicant Name: 
Moray Offshore Windfarm (West) Ltd 
Page 139

Page 140

Site Location — 23/01848/APP relates to 18/01046/EIA
Page 140

Page 141

Site Location — 23/01851APP relates to 21/01402/AMC
Page 141

Page 142

Location plan—23/01852/APP relates to 21/01561/AMC
16/01664/APP
Page 142

Page 143

Location plan—23/01853/APP relates to 21/01391/APP
16/
Page 143

Page 144

Page 144

Page 145

PLANNING APPLICATION: 23/01848/APP, 23/1851/APP,
23/01852/APP and 23/01853/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.   THE PROPOSAL 
  The development under construction, subject of the Section 42 application
is for two cable circuits, with each circuit comprising three separate
cables; a typical voltage for the cables will be between 132 and 400 kV
running underground from the Aberdeenshire coast, into Moray then
travelling to a new electricity substation at Whitehillock on the east side of
Moray, before leading underground again and joining into the SSE
national grid hub at Blackhillock near Keith. The cable laying and new
substation are well advanced in their construction. 
  Four separate Section 42 applications all seek to extend the construction
period from 5½ days a week to 7 days a week, inclusive of public
holidays. 
  Condition 18 of 18/01046/EIA reads as follows “Construction works
associated with the development audible at any point on the boundary of
any noise sensitive dwelling shall be permitted between 0700 – 1900
hours, Monday to Friday and 0700 – 1300 hours on Saturdays only, and
at no other times out with these permitted hours (including National
Holidays) shall construction works be undertaken except where previously
agreed in writing with Moray Council, as Planning Authority and where so
demonstrated that operational constraints require limited periods of
construction works to be undertaken out with the permitted/stated hours of
working. Reason – In order to minimise the impact of construction works
on the amenity of the surrounding area including local residents.” 
Application 23/01848/APP seeks to vary condition 18 so that instead of
the above time limits, the condition would permit “Construction works
associated with the development audible at any point on the boundary of
any noise sensitive dwelling shall be permitted between 0700 – 1900
hours, Monday to Sunday (including National Holidays). No construction
works shall be undertaken during any other times except where previously
agreed in writing with the Council, as Planning Authority and where so
demonstrated that operational constraints require limited period of
construction works to be undertaken out with the permitted/stated hours of
working”.
  Condition 7 of 21/01402/AMC states “Construction works (including
vehicle movements) associated with the development audible at any point
on the boundary of any noise sensitive dwelling shall be permitted
between 0700 – 1900 hours, Monday to Friday and 0700 – 1300 hours on
Saturdays only, and at no other times out with these permitted hours
(including National Holidays) shall construction works be undertaken
except where previously agreed in writing with the Council, as Planning
Page 145

Page 146

Authority and where so demonstrated that operational constraints require
limited periods of construction works to be undertaken out with the
permitted/stated hours of working. Reason - In order to ensure the
development minimises nuisance and disturbance to neighbouring
properties.” Application 23/01851/APP seeks to vary condition 7 to state
the following “Construction works associated with the development
audible at any point on the boundary of any noise sensitive dwelling shall
be permitted between 0700 – 1900 hours, Monday to Sunday (including
National Holidays). No construction works shall be undertaken during any
other times except where previously agreed in writing with the Council, as
Planning Authority and where so demonstrated that operational
constraints require limited period of construction works to be undertaken
out with the permitted/stated hours of working”.
  Condition 4 of 21/01561/AMC states “Construction works (including
vehicle movements) associated with the development audible at any point
on the boundary of any noise sensitive dwelling shall be permitted
between 0800 - 1900 hours, Monday to Friday and 0800 - 1300 hours on
Saturdays only, and at no other times out with these permitted hours
(including National Holidays) shall construction works be undertaken
except where previously agreed in writing with the Council, as Planning
Authority and where so demonstrated that operational constraints require
limited periods of construction works to be undertaken out with the
permitted/stated hours of working. Reason - To ensure the construction
phase is operated at times that prevent nuisance to local residents.”
Application 23/01852/APP seeks to amend the condition 4 of the consent
to read “Construction works associated with the development audible at
any point on the boundary of any noise sensitive dwelling shall be
permitted between 0700 – 1900 hours, Monday to Sunday (including
National Holidays). No construction works shall be undertaken during any
other times except where previously agreed in writing with the Council, as
Planning Authority and where so demonstrated that operational
constraints require limited period of construction works to be undertaken
out with the permitted/stated hours of working”.
  Condition 7 of planning application 21/01391/APP states “Construction
works (including vehicle movements) associated with the development
audible at any point on the boundary of any noise sensitive dwelling shall
be permitted between 0800 - 1900 hours, Monday to Friday and 0800 -
1300 hours on Saturdays only, and at no other times out with these
permitted hours (including National Holidays) shall construction works be
undertaken except where previously agreed in writing with the Council, as
Planning Authority and where so demonstrated that operational
constraints require limited periods of construction works to be undertaken
out with the permitted/stated hours of working. Reason - To ensure the
construction phase is operated at times that prevent nuisance to local
residents.” Application 23/01853/APP seeks to amend the condition to
read Construction works associated with the development audible at any
point on the boundary of any noise sensitive dwelling shall be permitted
between 0700 – 1900 hours, Monday to Sunday (including National
Holidays). No construction works shall be undertaken during any other
times except where previously agreed in writing with the Council, as
Planning Authority and where so demonstrated that operational
Page 146

Page 147

constraints require limited period of construction works to be undertaken
out with the permitted/stated hours of working”.
  The intent of all four variation applications is to permit construction activity
along the main cable route and substation site for a 12-hour duration if
required, seven days a week. The current consent allows a similar
duration at present from 7am to 7pm Monday to Friday only, and for a half
day on Saturdays (also avoiding National Holidays). 
2.   THE SITE 
  The cable route covers a long corridor crossing the Deskford and Grange
areas, Strathisla and south of Keith. As the cable route leads southward it
will cross beneath the River Isla, Aberdeen to Inverness railway line and
several public roads before crossing farmland on the western flanks of
Meikle Balloch Hill east of Keith. The new substation lies just south of the
A96 at Whitehillock, which lies just within Moray’s boundary with
Aberdeenshire. The underground cables would then leave the substation
and lead northward to link in with the national grid at the existing
Blackhillock substation. The cable corridor and substation cross mainly
agricultural land and several areas of forestry.
  These four applications relate to the initial Planning Permission in
Principle dealt with under 18/01046/EIA and subsequent detailed
applications for matters conditioned for the substation and a deviation to
the cable route. 
  Application 23/01852/APP seeks Section 42 for application
21/01561/AMC which focussed upon suspensive conditions and works at
the Substation site only at Whitehillock, which addressed separately from
the conditions covering the cable route. This application therefore relates
to the site of the substation compound currently under construction next to
Whitehillock Farm south of Keith. This is reflected in the submitted site
plan for 23/01852/APP which relates to the substation only.
  Application 23/01853/APP seeks a Section 42 variation to planning
permission 21/01391/APP which relates to a section of cable route near
Grange, Keith that had to deviate from the approved corridor under
Planning Permission in Principle 18/01046/EIA. This Section 42
application relates only to several km section of re-routed cable, for which
similar conditions were imposed to those on the remainder of the cable
route under other consents referred to above.
 The route under construct covered various woodland designations, areas
subject of surface water flooding, archaeological designations. 
3.   HISTORY 
For the site: 
18/01046/EIA - Planning Permission in Principle to construct onshore electrical
transmission infrastructure comprising of a cable transition jointing bay
underground cable circuits construction of substation to south of Keith with
further connecting cabling to allow connection with existing transmission
network at Blackhillock including temporary construction compounds access
Page 147

Page 148

track laydown areas and other associated works. This consent was granted by
Moray Council on 3 December 2018 following a Pre-determination Hearing. 
21/01391/APP - Installation of underground electricity cables and associated
development on land between Greenhill and Factors Park Plantation, Deskford,
Cullen. A current re-routed section of the cable route (3.1km in length) is
currently subject of a separate planning application, which had to be submitted
under a separate fully approval of planning permission as it lies outwith the
approved ‘corridor’ consented under 18/01046/EIA. If approved this length of
cable route would dovetail back into the cable subject of this application. As this
cable would exceed 132kV it constitutes a significant infrastructure
development and defined under the National Planning Framework 3 and
therefore constitutes a National level development in planning terms. This
application was approved by at a Pre-determination Hearing on 10th Feb 2021. 
21/01561/AMC - Approval of Matters Specified in Conditions 2-9 11-15, 18-20,
22, 24-29 on planning consent 18/01046/EIA to Construct onshore electrical
transmission infrastructure comprising of a cable transition jointing bay
underground cable circuits construction of substation to south of Keith with
further connecting cabling to allow connection with existing transmission
network from within the vicinity of Redhythe Point in Aberdeenshire Council
Area to Whitehillock Farm Keith Moray AB55 5PH. While the site address
relates to the whole site consented under 18/01046/EIA, this application
focusses on purifying the conditions for substation phase of the development
based near Whitehillock Farm at the southern end of the site. The submissions
for 21/01561/AMC are common to those lodged for this application and notably
the landscaping compensatory planting for the woodland lost on the cable route
is proposed around the location of the substation at Whitehillock. This
application was approved by Committee on 10th Feb 2021. 
18/00954/S36 - Construct and operate an offshore windfarm, inclusive of two
offshore electric substation platforms in the Moray Firth. This proposed offshore
windfarm would comprise of 62-85 offshore turbines, to a height between
199m-285m (the taller turbines being at the lower density of 62 total) and would
be located over 30km off the Moray Coast. The Moray Council was a consultee
on the application, which was approved by Marine Scotland. Of note the Marine
Scotland application identified the lifetime of the project as being circa 50 years,
so it is clearly the intent that the onshore infrastructure and substation would be
required for at least the same period. 
17/01380/PAN - Proposal of Application Notice for proposed onshore
substation and to onshore cable circuits. Moray Council responded on 25
September 2017 stating that the consultation measures proposed were
considered suitable and no further consultation or notification was necessary. 
17/00940/SCO - Scoping opinion for onshore transmission infrastructure
landward of Mean Low Water Springs for Moray Offshore Windfarm (West).
The scoping opinion was issued in August 2017 and included input from other
consultees. This scoping opinion related to the development subject to
application 18/01046/EIA. 
Page 148

Page 149

4.   POLICIES 
Relevant National Planning Framework 4 policies
NPF1 - Tackling the Climate
NPF2 - Climate mitigation and adaptation
NPF11 - Energy
NPF18 - Infrastructure first 
Moray Local Development Plan 2020 policies
PP3 - Infrastructure and Services
DP1 - Development Principles
DP9 - Renewable Energy
EP14 - Pollution Contamination Hazards 
5.   ADVERTISEMENTS 
5.1 Advertised for neighbour notification purposes. 
6.   CONSULTATIONS 
Consultee response common to both 23/01848/APP, 23/01851/APP,
23/01852/APP and 23/01853/APP. 
Environmental Health – No objections. The noise management and
monitoring measures shall be maintained in accordance with the approved
Construction Environmental Management Plans for the consents currently
approved on the development. This was suggested as further condition to be
imposed upon the four consents, but as CEMP conditions remain imposed
upon the original consents, such a condition would not be necessary. 
Transportation Section – No objections, however the change in working hours
should be reflected in an updated Construction Traffic Management Plan
(CTMP). Officer Note – This matter being covered under the variation sought
would not need to be conditioned separately, but an updated CTMP would be
requested in the event of approval. 
Transport Scotland – No objection. 
Aberdeenshire Council – No objection.   
7.   OBJECTIONS-REPRESENTATIONS 
NOTE: Following the determination of this application, name and address
details will be/have been removed (i.e. redacted) in accordance with the
General Data Protection Regulations (paragraph 3 of Minute, Planning &
Regulatory Services Committee 16 September 2014). 
Page 149

Page 150

3 representations were received in relation to applications 23/01848/APP and
23/01851/APP, but none were received for either 23/01852/APP or
23/01853/APP. 
Given the length of the cable route, 76 different properties were notified of the
Section 42, with several receiving multiple notifications for the above
applications.   
All objections/representations have been read and where material, given the
appropriate consideration prior to the recommendation finalised. The grounds
for objection/representation are summarised as follows: 
Heading of issues/objection reasons selected by those making representation
from objection/representation online objection web link.
  Activity at unsociable hours/behaviour.
  Dust.
  Precedent.
  Procedure not followed properly.
  Noise.
  Road safety.
  Traffic. 
Issue – An objector is unclear of what additional hours have been requested,
however the large lorries carrying heavy amounts of aggregate during the
summer presented dangerous conditions for long periods of time and at
weekends and early evenings. Our concerns included noise, dust, heavy lorries
sometimes travelling in convoy which could cause damage to our cottage by
the vibrations caused. The speed at which the lorries and other staff on the
project travel past the objectors property also caused dangerous conditions. 
Comment (PO) – The applicants should seek to ensure that contractors
operate vehicles safely and this matter will be raised with applicants. This
matter is one for enforcement of the Construction Traffic Management Plan
previously approved and would not prevent approval of the current applications.
Some of the HGV activity occurs on adopted roads, where no restrictions on
HGV’s exist such that it would be unreasonable to curtail their presence on the
public road network. The applicant has tried to keep construction traffic on the
haul roads where possible. 
Issue - The traffic issues that are long standing, well discussed and have been
fully ignored by all contractors in the area are only going to be exacerbated for
the residents and neighbours, who gain absolutely no benefit from any of the
works being undertaken. The residents and neighbours of these projects should
not be the ones to suffer for the inability of the contractor to adhere to their
original timescales. 
Comment (PO) – The longer working hours would exacerbate some of the
disruption referred to by objectors, and weight is attached to this in the below
assessment. Experiencing passing construction traffic over the weekend, would
be noticed by residents, but permission has been given by Moray Council on
previous occasions for longer working hours, so it may be incorrect to say the
applicant has ignored the condition, where all the consents sought to be varied
have a flexibility built. The applicant has complied with the conditions and have
made may prior requests to the Moray Council for longer working hours. The
Page 150

Page 151

comment that residents gain absolutely no benefit from such development is,
with respect, inaccurate where the wider and environmental benefits of having
a renewable/carbon free energy grid does benefit society and the environment. 
Issue - No notification was provided to neighbours that works would be outwith
approved hours. It has been our observation that the construction teams
primarily work on a 10 day on 4 days off rota. 
Comment (PO) – Part of the reasoning for some of the requests for longer
hours or weekend working has been to accommodate specialist work, and also
for example to works over the weekend as requested by certain utilities and
Network Rail to minimise disruption and risk to assets. There is not obligation
on the park of the applicants to notify neighbours of intended longer working
hours. To notify them would however be good practice. 
Issue – There is unmanned activity outwith these hours. There is a cable
junction point within approximately 120 metres of our property. There has been
a diesel generator in situ for the past weeks/months that is running constantly
until the fuel runs out and it is then refuelled. This is noisy, in particular,
because being sited in a rural area where there is minimal other noise.
Naturally, the extent of the constant droning noise is dependent on the wind
direction. Therefore, surely this pump should not be operating outside of
approved hours, and I consider our dwelling to be in the 'noise sensitive'
category. 
Comment (PO) – There is no obligation upon the applicant to notify property
owners of intended additional working periods, although Moray Council would
encourage good communication with neighbours’ as best practice. 
Issue - The planning approval wording should be amended to explicitly state
whether the working hours relate to manned and unmanned machinery.
Approval should include the necessity to warn nearby dwellings of any changes
to working hours especially when these are known to the developers. 
Comment (PO) – The comment about unmanned machinery and generators
running overnight is a matter to be addressed separately under the existing
Construction Environmental Management Plan. These matters will be raised
separately with the developer but would not constitute grounds to refuse the
current applications. 
8.   OBSERVATIONS 
8.1 Section 42 of the Town and Country Planning (Scotland) Act 1997 as amended
allows applicants to apply to develop land without compliance with conditions
previous attached to a planning consent. In determining such an application,
the Council, as Planning Authority can only consider the conditions subject to
which planning permission should be granted and may: 
  grant permission unconditionally (i.e. remove the conditions attached to
the planning consent); 
 grant permission conditionally with differing conditions; or 
  refuse the application (i.e. keep the conditions attached to the planning
consent). 
Page 151

Page 152

8.2 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the development plan, namely the adopted National
Planning Framework 4 (NPF) and adopted Moray Local Development Plan
2020 (MLDP) unless material considerations indicate otherwise. 
8.3 Given the nature of the Section 42 proposals, it has not been necessary to seek
any further procedure under The Electricity Works (Environmental Impact
Assessment) (Scotland) Regulations 2017. 
8.4 Background 
The applicants have cited various reasons which have contributed to the project
timetable falling behind over the past couple of years and have been seeking to
get the project back on track with the scheduled completion of onshore
transmission infrastructure to support the Moray West Offshore wind energy
project. 
8.5 All the planning conditions subject of the Section 42 request already have in-
built flexibility to allow for additional working hours beyond those stated 5½
days a week only with the prior written agreement of the Moray Council as
Planning Authority. To this end, the relevant working hours of the above
consents have seen numerous requests from the applicants for working outwith
the prescribed hours on a case-by-case basis. These requests have been
made as the applicants seek to get the wider project timetable back on
schedule with the wider project. The current applications seek to extend
working hours conditions, so the numerous requests for out of hours working
will be regularised and should avoid the repetitive submission/assessment of
these requests. 
8.6 The main planning issues are as follows. 
8.7 Section 42 application
In considering a Section 42 application the planning authority can only consider
the conditions that are the subject of the applications although this does not
preclude consideration of the overall effect of granting a new permission. The
effect of granting a Section 42 application is the creation of a new planning
permission and therefore all conditions of the previous consent must be
reiterated in order to have effect. For each of the four Section 42 requests
covered by the report, the effect of each application and their collective impact
have been considered. 
For clarification, the Section 42 application that relates to the original Planning
Permision in Principle (EIA) 18/01046/EIA, has been commenced as evidenced
by the subsequent detailed consents for approval of matters conditioned.
Therefore, the recommendation for varying the hours of construction activity for
this consent (if approved) would not repeat all the superseded conditions that
have already been discharged and would not have the effect of issuing a new
Planning Permission in Principle (PPP). The PPP having been in effect
implemented, need not be re-issued, but to align the other detailed consents
with the original PPP, the recommendation for 23/01848/APP would allow the
original consent to tie in with the subsequent variations. 
Page 152

Page 153

8.8 Principle of Development
National Planning Framework 4 (NPF4) is support of renewable energy
development and the infrastructure supporting it. Policy 11 ‘Energy’ alongside
policies relating to enabling development that help tackle climate change
(Policy 1 ‘Tackling the climate and nature crises’) imbed the general principle of
supporting renewable energy proposals. This means that the onshore
infrastructure subject of this report, which will serve the consented offshore
windfarm known as Moray West not only benefits from the various commenced
planning consents, but subsequent to their approval have added support
afforded to them by the position of NPF4. Similarly, within Moray Local
Development Plans 2020 (MLDP) policy DP9 ‘Renewable Energy’ is similarly
supportive stating that renewable energy proposals will be considered
favourably. 
8.9 Both NPF4 policy 11 and MLDP policy DP9 do however state that such support
for renewables must be measured against appropriate mitigation measures to
address the impact of such development. Addressing unacceptable adverse
impacts should be imbedded in the design and manner in which such
developments are carried out. 
8.10 Whilst Covid19 crisis may have passed, the applicants cite it as having
contributed to delays in the start of construction in 2022, thereby taking the
project off schedule. Following the re-opening of the construction sites, post
Covid19 the Scottish Government did issue advice to Planning Authorities
instructing them to allow more flexible working hours on construction sites to
aid economic recovery. While some time has passed since any lockdown was
in place, the guidance is still given some consideration in planning where large,
national development such as this are concerned. 
8.11 Amenity Issues
Approval of a development of this scale, covering many km of countryside and
involving extensive excavation, substantial quantities of construction materials
has unavoidably caused disruption to local residents and those using the local
road network. 
8.12 There have been several complaints about increased traffic movements,
construction lighting, generators running for long periods etc, not all relate to
the hours of operation (subject of the current planning applications). While there
is still significant activity along the cable route, and the haul road running
parallel to much of the cable route is used where possible, the overall increase
in activity from a project of this scale should not be understated. 
8.13 Typically for any large infrastructure project, given the scale of activities across
a wide area, conditions are imposed to keep construction activity to a level that
allows for some respite to residences in the area, especially in the evenings
and weekends. The implications of the request to work until 7pm every evening
is considered below, but several factors may influence the below consideration.
  The most invasive and intense construction activities are now largely
complete. All cables are now laid, and the majority of the infrastructure for
the substation is now on site. The majority of earth works have been
undertaken already, with largely finishing the jointing chambers and back-
filling yet to be done.
Page 153

Page 154

  The works remain transient in that the site being linear sees construction
works move along the cable route.
  Noting the complaints, some relate to the wider implications of the
development occurring and would not specifically be exacerbated by long
construction works.
  The applicants in getting the project back in line with project schedule
would see works concluded quicker, which would benefit local
communities and see agricultural land returned to use sooner. 
8.14 With the lighter evenings, and better weather, construction activity would
normally extend hours activity across most infrastructure building sites, and
consent already exists for works to be carried out until 7pm 5 days a week. The
key matter is whether allowing such activity to continue until 7pm would cause
too detrimental an impact upon residents near the cable route and substation.
Several of those making representations do not wish to see any extension of
working hours and further allege that the times permitted are already routinely
breached. Weight is attached to this concern, and it is unusual for sites to seek
to operate 7 days a week. 
8.15 Some of the matters raised are however matters that should be addressed
under the existing consents in terms of construction management plans,
construction environmental management plans and general good practice on
building sites. These matters can be addressed separately to the consideration
of the current request to all four applications. Matters such as light pollution,
generators being left running overnight are matters that can be addressed
separately. Officers have already raised with Moray West some of these
matters such as light spill for mobile light stanchions when complaints were
received. Therefore, in line with the comments from the Environmental Health
Manager, these matters can be addressed separately, and will need to be dealt
with by the applicant. 
Conclusion
On balance the benefits of allowing works to occur over a longer weekly
duration, and seeing the project completed sooner outweigh the concerns
raised. The stage of the project is also a material consideration with much of
the earthwork well advanced, the import of materials to the site focussed now
upon testing, backfill, restoration then commissioning of the project. Less light
pollution should occur too, as the summer months approach. Once the
construction period is complete, the development would have very limited effect
on neighbouring amenity during its operational period. 
The significant weight attached within NPF4 to supporting energy infrastructure
projects which enable renewable energy projects to progress and become
operational when scheduled to do so, add further weight to the need to allow
Moray West to get the onshore infrastructure completed. Therefore, all four
applications (23/01848/APP, 23/1851/APP, 23/01852/APP and 23/01853/APP)
to vary construction hours are recommended for approval. 23/01848/APP will
vary construction hours only for the original planning permission in principle. 
Page 154

Page 155

REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposed Section 42 variation to vary conditions allowing for longer
construction working hours (subject the compliance with existing conditions
relating to Construction Environmental Management Plans hereby repeated)
will accord with the relevant aims and policies of the National Planning
Framework 4 and Moray Local Development Plan 2020.   
Author/Contact
Officer:
Neal MacPherson          
Principal Planning Officer
Ext: 01343 563266 
Beverly Smith
Development Management & Building Standards Manager 
Page 155

Page 156

Page 156

Page 157

WARD 08_17 
23/02019/AMC
16th November 2023
Approval of the matters specified in condition 4 (layout
of plot) condition 5 (plans sections and elevations)
condition 6 (boundary treatments and other
development) condition 7 (sections) condition 8
(landscaping), condition 10 (affordable housing) and
condition 11 (enhanced accessibility) of 19/00320/PPP to
provide 16 houses and associated cohousing buildings
on Plot 8 9 11 12 And 13.1 On Land At North Whins The
Park Findhorn Moray
for Duneland Limited 
Comments: 
 This application is reported to the Planning and Regulatory Services Committee
as it was agreed at the meeting on 10 December 2019 that all further applications
related to planning permission reference 19/00320/PPP be determined by the
Planning & Regulatory Services Committee.
 Only four plots for single houses (4,6,7 and 10), the plots for commercial units
(plots 1-3) and plot 15 which is identified for a community facility have still to come
forward for approval of matters specified in condition.  Given that these will be
relatively small scale developments it is recommended that Members agree that
the remaining further applications for the North Whins can be dealt with under
delegated powers. 
Procedure: 
 None. 
Recommendation 
Grant Planning Permission - Subject to following: 
Conditions/Reasons 
1. That the development to which the permission relates must be begun not later
than whichever is the later of the following dates:-
i  the expiration of 3 years from the date of the grant of planning permission in
principle; or
ii.  the expiration of 2 years from the final approval of the matters specified in
conditions or in the case of approval on different dates the final approval of
the last such matter to be approved.
Item 7.
Page 157

Page 158

Reason:  The time limit condition is imposed in order to comply with the
requirements of Section 59 of the Town and Country Planning (Scotland) Act 1997
as amended by the Planning etc. (Scotland) Act 2006. 
2. The development hereby granted forms part of, and is related to, the development
granted planning permission under formal decision notice 19/00320/PPP dated 4
November 2019 wherein the terms and conditions as attached to that permission
are hereby reiterated and remain in force in so far as they relate to the
development hereby approved, in particular Conditions 10-20 inclusive, including
any details already approved there under to discharge the requirements of the
identified conditions. 
Reason:  To ensure an acceptable form of development and that it progresses in
accordance with the already approved and required details. 
3. No works shall commence on site until a Construction Traffic Management Plan
has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with the Roads Authority.  The Construction Traffic
Management Plan shall include the following information: 
i.   construction access routes 
ii.   traffic management 
iii.   construction hours / delivery restriction times 
iv.   program and duration 
v.   measures to be put in place to safeguard the movements of pedestrians 
Thereafter, the development shall be implemented in accordance with the
approved details. 
Reason:  To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site.
.
4. Unit 619 as identified on approved plan A110 hereby approved shall, at all times,
remain accessible housing as detailed in the submitted accessible housing
compliance statement unless otherwise agreed with the Council, as Planning
Authority. 
Reason:  To ensure an acceptable form of development in terms of the required
provision and delivery of accessible housing within the site as required and
defined in terms of current planning policy and associated supplementary planning
guidance. 
5. As part of the permission hereby granted, units 616 and 626 hereby approved
shall only be used for affordable housing purposes in accordance with the
agreement(s) reached between the applicant/developer and Moray Council and/or
any registered social landlord (e.g. housing association or similar) to enable the
long term delivery of affordable housing on this site; and no development shall
commence until details of the agreement(s) to confirm the arrangements for the
delivery of the proposed affordable accommodation hereby approved shall be
submitted to and approved in writing by the Council, as Planning Authority. 
Page 158

Page 159

Thereafter, the development shall be implemented in accordance with the
approved details. 
Reason:  To ensure an acceptable form of development in terms of the required
provision and delivery of the affordable housing accommodation proposed for this
site wherein the benefits of such provision are passed on to serve the community
in future years. 
6. All surface water proposals shall be implemented prior to completion of any unit
hereby approved. 
Reason:  In order to minimise the impacts of the development works upon the
environment. 
7. No trees shall be removed from the application site without the prior written
approval of the planning authority. 
Reason:  In order to ensure tree removal is adequately controlled. 
8. All landscaping works shall be carried out in accordance with approved plan P-
A110 unless otherwise agreed in writing with the planning authority details all
planting, seeding or turfing shall be carried out in the first planting season
following the first occupation of any of the units hereby approved.  Any trees or
plants which (within a period of 5 years from the planting) die, are removed or
become seriously damaged or diseased shall be replaced in the following planting
season with others of similar size, number and species unless otherwise approved
by the Council, as Planning Authority. 
Reason:  To ensure that the approved landscaping works are timeously carried
out and properly maintained in a manner which will not adversely affect the
development or amenity and character of the area and because no such
information was included with the application. 
9. The development shall at all times be carried out in accordance with the
Duneland, Findhorn Construction Environmental Management Plan as amended
dated 1 November 2023. 
Reason:  In order to minimise the impacts of the development works upon the
environment. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The proposal accords with the development plan and there are no material
considerations that indicate otherwise. 
Page 159

Page 160

LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
P-A009  Location plan
P-A105  Central cluster - elevations
P-A103  East cluster - floor plans and facilities
P-A106  East cluster - elevations
P-A107  Shared facilities - elevations
P-A104  West cluster - elevations
P-A102  Central cluster - floor plans
P-A101  West cluster - floor plans
P-A100  Proposed parking plan
P-A110  Site and landscape plan  
SUDS soakaway design 
Page 160

Page 161

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Plot 8  9 11 12 And 13.1 On Land At North Whins
The Park Findhorn
Planning Application Ref Number: 
23/02019/AMC
Location Plan
Applicant Name: 
Duneland Limited
Page 161

Page 162

Site Location
Page 162

Page 163

Site and landscape plan
16/01664/APP
Page 163

Page 164

Masterplan
16/
Page 164

Page 165

Photo location plan
16/
Page 165

Page 166

Photo 1
16/
Page 166

Page 167

Photo 2
16/
Page 167

Page 168

Page 168

Page 169

PLANNING APPLICATION: 23/02019/AMC 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for
Reports on Applications 
1.   THE PROPOSAL 
  This application seeks approval of the matters specified in condition 4
(layout of plot), condition 5 (plans, sections and elevations), condition 6
(boundary treatments and other development), condition 7 (sections),
condition 8 (landscaping), condition 10 (affordable housing) and condition
11 (accessible housing) of 19/00320/PPP to provide 16 units of
accommodation on plots 8-12 and 13.1 of the development site known as
North Whins.  Two communal facilities are also proposed along with
surface water drainage and landscaping;
  Permission in Principle for 38 units, 3 craft units and associated
infrastructure at North Whins was granted on 4 November 2019.
Conditions 10 and 11 of that consent require 10 affordable housing units
to be provided on site and 3 of the private housing units provided to be
designed to be accessible;
  Plots 8-12 are identified as accommodating ‘multi-unit housing’ on the
masterplan approved as part of 19/00320/PPP while plot 13.1 is identified
as co-housing.  These labels are indicative only;
  The current application proposes 16 units arranged in three clusters
identified as west, central and east.  One affordable and one accessible
unit are provided in the western cluster and another affordable unit is
found in the eastern cluster; 
  The west cluster consists of one bedroom (plot 619 is a studio) duplexes
with loft platforms.  Each building will have a curved roof and will be 5.6m
at their highest point.  
  The central cluster consists of two storey two bedroom houses.  Each
building will have a curved roof and will be 6.9m at their highest point.
Each has a south facing balcony;
  The eastern cluster consists of two storey two bedroom houses arranged
in a single block.  Each building will have a curved roof and will be 7.1m at
their highest point;
  The roof of each unit will be a combination of sedum and grey metal which
the walls will be finished in a combination of larch cladding and synthetic
render;
  The two affordable housing units are unit 616 in the western cluster which
is a one bedroom unit and 626 in the eastern cluster which is a two
bedroom unit;
  The accessible unit (619) is studio with loft space in the western cluster of
the proposed development;
  This current proposals would ensure that the affordable and accessible
requirements of the overall planning permission for the North Whins
(19/00320/PPP) site are met in full;
Page 169

Page 170

  The communal facilities are single storey structures.  One will provide a
shared laundry and the other will provide a common room, kitchen area
and toilet.  Both will also house facilities for a district heating scheme to
serve the proposal.  The buildings will be timber clad with grey metal
roofs.  Each roof will accommodate a 10.5kv pv array with battery storage;
  The development incorporates solar panels, air source heat pumps and a
district heating system for the scheme;
  The access and parking for the overall North Whins development was
approved under separate application (19/01649/AMC) that covered the
comprehensive layout of the site and does not form part of this
application.  The current application site is accessed via the main road
through the development approved under the 2019 AMC.  Plot 13.1 forms
the end of this road and the houses on plot 13.2 to the east are accessed
separately;
  To date four further applications for the comprehensive layout of the site
(19/01649/AMC), 8 affordable units on plot 13.2 (20/00135/AMC), 9 unit
terrace on plot 14 (20/01222/AMC) and a single house on plot 5
(22/01094/AMC) have come forward and been approved. A further 4
single house plots remain to be developed along with the commercial
units; and
  This application is accompanied by a Design and Access Statement,
Accessible Housing Compliance Statement, Affordable Housing
Statement, Ground Investigation Report and SUDS calculations and
updated Construction Environmental Management Plan. 
2.   THE SITE 
  The application site consists of plots 8-12 and 13.1 in the North Whins
development which has permission in principle under 19/00320/PPP.
   The site is in the centre of the overall consented development site.
  Plot 13.2 to the east has already been developed with 8 affordable houses
(20/00135/AMC).  Plot 10 to the north and plots 4-7 to the west are
identified for single houses but to date details have come forward for plot
5 (22/01094/AMC) only.  Work is underway on a 9 unit terrace on plot 14
(20/01222/AMC) to the south west. 
   This site will be accessed from the south west via an access road running
through the North Whins site approved as part of a further application
(19/01649/AMC) that dealt with the detailed layout of the site. Plot 13.1
will sit at the end of the private access road.  The houses built on plot 13.2
are accessed separately from the east. 
3.   HISTORY 
22/01094/AMC - Approval of matters specified in conditions 4-6 imposed on
19/00320/PPP (Erect a dwellinghouse and associated landscaping) on Plot 5
North Whins Findhorn permitted on 27/10/2022 following consideration by the
Planning and Regulatory Services Committee. 
20/01222/AMC - Approval of the matters specified in condition 4 (layout of plot),
condition 5 (plans, sections and elevations), condition 6 (boundary treatments
Page 170

Page 171

and other development), condition 7 (sections), condition 8 (landscaping) and
condition 11 (accessible housing) of 19/00320/PPP to provide a 9 unit terraced
development on plot 14 permitted on 26/01/2021 following consideration by the
Planning and Regulatory Services Committee. 
20/00135/AMC - Approval of the matters specified in condition 4 (layout of plot)
condition 5 (plans sections and elevations) condition 6 (boundary treatments
and other development) condition 7 (sections) condition 8 (landscaping) and
condition 10 (affordable housing) of 19/00320/PPP to provide 8 affordable units
on plot 13.2 permitted on 24/09/2020 following consideration by the Emergency
Cabinet. 
20/00016/APP - Amend condition 9(b) imposed on 19/00320/PPP to read as
follows: a.) All development shall be in accordance with the design principles
set out in the approved Masterplan (except that buildings shall not be limited to
a maximum of 1 ½ storey). b) All buildings shall have a maximum ridge height
of 7.1m – permitted on 13/08/2020 following consideration by the Planning and
Regulatory Services Committee. 
19/01649/AMC - Approval of Matters Specified in conditions 3 (overall layout),
7 (sections) and 8 (landscaping) of 19/00320/PPP – permitted on 23/09/2020
following consideration by the Emergency Cabinet. 
19/01436/APP - Amend condition 9(b) imposed on 19/00320/PPP to read as
follows: All buildings shall have a maximum ridge height of 15.7m above
Ordnance Datum (AOD) (as amended) – withdrawn 14/01/2020. 
19/00320/PPP – Planning Permission in Principle to erect 38 dwellinghouses
and 3 craft/commercial units and a community facility – permitted 04/11/2019
following consideration by the Planning and Regulatory Services Committee. 
4.   POLICIES 
NPF4 
NPF1 - Tackling the Climate
NPF2 - Climate mitigation and adaptation
NPF3 - Biodiversity
NPF4 - Natural Places
NPF5 - Soils
NPF6 - Forestry, woodland and trees
NPF7 - Historic assets and places
NPF13 - Sustainable transport
NPF14 - Design, quality and place
NPF18 - Infrastructure first
NPF22 - Flood risk
NPF23 - Health and safety 
Page 171

Page 172

MLDP 2020 
PP1 Placemaking
PP2 Sustainable Economic Growth
PP3 Infrastructure and Services
DP1 Development Principles
DP2 Housing
EP1 Natural Heritage Designation
EP3 Special Landscape Areas
EP7 Forestry Woodland and Trees
EP12 Management and Enhancement Water
EP13 Foul Drainage
EP14 Pollution Contamination Hazards 
5.   ADVERTISEMENTS 
5.1 Advertised for neighbour notification purposes. 
6.   CONSULTATIONS 
Findhorn & Kinloss Community Council: No objection following clarification
in relation to accessible housing. 
Housing:  No objection. 
Contaminated Land:  No objection. 
Environmental Health:  No objection. 
Developer Obligations:  None sought. 
Moray Flood Risk Management: No objection. 
Transportation:  No objection. 
Scottish Water: No objection. 
7.   OBJECTIONS-REPRESENTATIONS 
None. 
8.   OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined
in accordance with the Development Plan i.e. National Planning Framework 4
(NPF4) and the adopted Moray Local Development Plan 2015 (MLDP) unless
material considerations indicate otherwise. 
Page 172

Page 173

8.2 The main issues are considered below: 
8.3 Planning History
Planning Permission in principle (19/00320/PPP) for 38 houses, 3
craft/commercial units and a community facility with associated infrastructure
was granted on 4 November 2019.  The permission was granted subject to a
number of conditions requiring the approval of matters including layout, design
and materials, landscaping, sections and drainage.  There are also conditions
relating to affordable and accessible housing, environmental management,
construction traffic, parking and improvements to the public road.  This
permission has subsequently been varied by a S42 application (20/00016/APP)
which allowed ridge heights of up to 7.1m and removing the limitation of
buildings to be a maximum of 1 ½ storey in design.  To date there have been
four further applications on the site.  The first (19/1649/AMC) dealt with the
comprehensive layout of the site including the access road, all the parking for
the development and communal areas.  The following applications provided for
8 affordable housing units on plot 13.2 (20/00135/AMC), a terrace of 8 units on
plot 14 (20/0122/AMC) and a single house on plot 5 (22/01094/AMC). 
8.4 Should the current application be approved only four plots for single houses,
the three commercial units and the community facility are still to be brought
forward. 
8.5 Compliance with the terms of the Permission in Principle
This application is for approval of the matters specified in conditions 4-8 and
conditions 10 & 11 the original permission in principle (19/00320/PPP).  The
remaining conditions of the permission in principle continue to apply.  For the
avoidance of doubt a condition is recommended to make clear that the
development must be carried out in accordance with the terms of the original
permission and any subsequent documents approved as part of the conditions
of that permission such as the Written Scheme of (archaeological) Investigation
(WSI). 
8.6 Design and Materials (NPF4 policy 16 and policy PP1 & DP1)
The 16 units proposed are arranged in three clusters (west, central and east). 
Each cluster is designed in a slightly different manner but coherent design
themes run throughout the development.  Each building has a curved roof with
a terrace on the north elevation and some form of projection on the south
elevation.  The central cluster incorporate an enclosed balcony on their
southern elevation.  The buildings in the west cluster will be 5.6m at their
highest point, the central 6.9m and the east 7.1m.  This is in keeping with the
terms of the permission in principle (19/00320/AMC) which were amended by a
section 42 application (20/00016/APP) to allow buildings with a maximum ridge
height of 7.1m.  The roof will be a combination of sedum and grey metal which
the walls will be finished in a combination of larch cladding and synthetic
render.  This pallet of materials meets the requirements of the permission in
principle and the approved masterplan document which requires that buildings
have maximum of three primary external materials consisting of stone, timber
and rendered blockwork and the roofs to covered in natural slate, metal
sheeting or a living planted material.  These materials will be appropriate for
buildings in this setting. 
Page 173

Page 174

8.7 Communal facilities are also proposed in the west and central clusters and are
single storey structures with projecting canopies.  Both buildings will be timber
clad with grey metal roofs matching the main buildings.  These are simple and
functional buildings which are appropriate to the setting. 
8.8 The form and finish of the proposals is in keeping with the character of the
already approved developments on the plots to the east and west and existing
development at West Whins.  It will contribute to a sense of place and
distinctiveness.  The proposals meet the terms of the permission in principle
and the broad design principles set out in the master plan document approved
as part of that application.  The design and materials comply with policies PP1
(i) DP1 (i). 
8.9 Privacy and Overlooking (NPF4 policy 16 and policy DP1)
The building is sited and designed in a manner that will not cause overlooking
of neighbouring houses or any loss of privacy.  The upper floor windows on the
southern elevations of the western and eastern clusters and the enclosed
balconies on the central cluster will principally overlook the communal garden
and are sufficiently separated from neighbouring properties to avoid any
adverse impact on their amenity.  It is also noted that the upper floor windows
in the west cluster serve an attic space rather than rooms.  The upper floor
windows on the northern elevations of the buildings in the eastern and western
clusters look over the duneland beyond the site.  The central cluster looks onto
plot 10 (as yet undeveloped) but these buildings only have roof lights on this
elevation which will prevent unacceptable overlooking.  The western and
central clusters have only high level openings at upper floor level on the
eastern and western elevations.  The eastern cluster have upper floor windows
on the eastern and western elevations but these look onto each other or to the
land to east.  The nearest building is off site.  There is adequate distance
between the proposed buildings and the neighbouring plots. In this respect the
proposal complies with NPF4 policy 16 and policy DP1 (e). 
8.10 Affordable Housing (NPF4 policy 16 & MLDP policy DP2)
The original permission in principle (19/00320/PPP) for the North Whins
development requires 10 affordable housing units to be provided on site.  Eight
affordable units have already been provided 20/00135/AMC on plot 13.2 and
these are occupied.  The current application proposes two additional affordable
units which represents all the required provision.  An affordable housing
statement has been provided.  This sets out that these units will be designated
for affordable purchase using a Rural Housing Burden and states that
affordability will meet or exceed open market shared equity scheme thresholds. 
The Council’s Housing Strategy and Development Manager has no objection
The proposal meets the terms of the condition and will ensure compliance with
NPF4 policy 16 and MLDP policy DP2. 
8.11 Accessible Housing (NPF4 policy 16 & MLDP policy DP2)
The original permission in principle (19/00320/PPP) for the North Whins
development requires 3 accessible housing units two of which must be
wheelchair accessible to be provided on site.  Two wheelchair accessible units
are to be provided as part of the 9 unit terrace approved on plot 14.  The
current application will provide the last required accessible housing unit.  An
accessible housing statement has been provided setting out the accessible
Page 174

Page 175

features of the proposed unit.  The Council’s Housing Strategy and
Development Manager has no objection.  The proposal meets the terms of the
condition and will ensure compliance with MLDP policy DP2. 
8.12 Trees and Landscaping (NPF4 policies 6 & 14 & MLDP policies PP1 &
EP7)
The overall landscaping and treatment of trees across the North Whins site has
been addressed as part of the application (19/01649/AMC) for the
comprehensive layout of the site.  The landscaping of each plot has been
addressed as each separate application has come forward and the landscaping
of plots 8-12 and 13.1 forms part of the current application.  No existing trees
are to be removed from the application site.  The proposed planting includes 10
fruit trees across the application site and native species hedges around edges. 
The landscaping proposed is in keeping with that throughout the development. 
It will help to integrate the development into its surroundings and contribute
towards effective placemaking.  A condition will be attached to ensure that the
planting is timeously provided.  Subject to condition the proposals comply with
NPF4 policies 6 and 14 and MLDP PP1 and EP7. 
8.13 Biodiversity & Environmental Protection (NPF4 policy 3 & MLDP DP1 &
EP2)
The permission in principle for overall development (19/00320/PPP) was
determined prior to the adoption of MLDP 2020 and NPF4.  NPF4 policy 3
requires all proposals for major developments to conserve, restore and
enhance biodiversity.  This is echoed in MLDP policy EP2.  The proposals for
the overall development include measures to enhance biodiversity including the
creation of a wildlife corridor, a lichen protection area and planting that is
sensitive to the dunelands.  The current application includes native species
planting and fruit trees across the application site which will serve to enhance
the biodiversity of the site.  The proposals are appropriate to the location and
scale of development and accord with NPF policy 3 and MLDP policy EP2.   
8.14 The original permission in principle (19/00320/PPP) was granted subject to a
condition that required the submission of a Construction Environmental
Management Plan (CEMP).  A CEMP covering the overall development has
been approved but SEPA noted that they would welcome further iterations that
were specific to each plot as development came forward.  An updated version
of the CEMP covering the whole North Whins site but taking account of the
details of the development currently proposed was submitted with this
application.  A condition is recommended to ensure that the CEMP is
implemented in full.  Compliance with the CEMP, and other environmental
safeguards, such a Construction Traffic Management Plan (CTMP) ensure
compliance with policy DP1 Development Principles and EP12 Management
and Enhancement of the Water Environment. 
8.15 Access and Parking (NPF4 policy 13 & MLDP policy DP1) 
The site is accessed via a new road running through the North Whins
development.  Plot 13.1 forms the eastern end of this road as the houses on
plot 13.2 are accessed separately from the east.  The access and parking are
dealt with as part of the application (19/01649/AMC) for the comprehensive
layout of the site and do not form part of this application. 
Page 175

Page 176

8.16 A Construction Traffic Management Plan (CTMP) has been approved as part of
the application (19/00320/PPP) for the overall development.  This document will
require to be updated to take account of the current proposals.  A condition is
therefore recommended requiring an updated CTMP to be provided for the
development on these plots.  This is in line with the approach taken for plots
13.2 (affordable housing) (20/00135/AMC) and 14 (9 unit terrace)
(20/01222/AMC). 
8.17 Drainage (NPF4 policy 22 & MLDP policies DP1, EP12 & EP13)
Two surface water soakaways are proposed to serve the development. 
Detailed calculations have been provided to justify the size and design.  Moray
Flood Risk Management has confirmed that they have no objection to the
proposals.  A condition is recommended to ensure that these measures are
implemented in full.  The proposals ensure acceptable drainage provision that
will ensure that surface water is dealt within a sustainable manner in
accordance with NPF4 policy 22 and MLDP policies DP1 and EP12. 
8.18 The development will be connected to the public sewer and water supply.
Scottish Water has no objection but securing a connection to public utilities
remains the responsibility of the developer.  These proposals accord with
MLDP 2020 policy EP13. 
8.19 Climate & Nature Crisis and Climate Mitigation (NPF4 policies 1, 2 & 3 &
MLDP EP2)
The original permission (19/000320/APP) was approved under the current LDP
but prior to the adoption of NPF4. NPF4 policies 1 and 2 require significant
weight to be given to the climate and nature crises in the assessment of all
applications and requires climate mitigation from all development. In this case
the proposal relates to the approval of matters specified in the conditions of an
approved development.  The developer has submitted information in relation to
carbon setting out that the development is being constructed to passive house
standard with low embodied carbon eco friendly materials used throughout. 
The recyclability of materials is also considered so that the materials used have
a further life cycle.  A heating and power generation scheme is also to be
incorporated and solar thermal and pv panels are to be provided along with
battery storage.  An onsite microgrid is also proposed to reduce dependency on
the grid.  The houses are south facing so will benefit from passive solar gain
and are sheltered from the wind to the north by canopies.  The proposals are
considered to comply with NPF4 policies 1 and 2. 
Conclusion 
This is a high quality development that embodies the strong placemaking
principles that underpinned the original planning permission for the overall
development.  The application will also secure the remaining affordable and
accessible housing requirements for the overall North Whins development.  The
proposal accords with policy and is in line with the terms of the permission in
principle.  It is recommended that the matters specified in the stated conditions
are approved. 
Page 176

Page 177

REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The proposal accords with the development plan and there are no material
considerations that indicate otherwise. 
Author/Contact
Officer:
Lisa Macdonald           
Senior Planning Officer
Ext: 01343 563479 
Beverly Smith
Development Management & Building Standards Manager 
Page 177

Page 178

Page 178

Page 179

REPORT TO: PLANNING AND REGULATORY SERVICES COMMITTEE ON 
12 MARCH 2023 
SUBJECT: 24/00058/PAN – PROPOSED FORMATION OF QUARRY FOR
THE EXTRACTION AND PROCESSING OF SAND AND GRAVEL
AND PRODUCTION OF READY-MIX CONCRETE ON LAND TO
THE SOUTH-EAST OF DYKESIDE FARM, BIRNIE, ELGIN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee that a Proposal of Application Notice (PAN) was
submitted on 15 January 2024 by agents on behalf of Leith (Scotland) Limited. 
1.2 This report is submitted to Committee in terms of Section III (E) (1) of the
Council’s Scheme of Administration relating to exercising the statutory
functions of the Council as a Planning Authority. 
2. RECOMMENDATION 
2.1 It is recommended that:  
(i) in noting the terms of this report, the Committee advise upon any
provisional views/relevant issues that Members of this Committee
(or any other Member(s) of the Council) wish to raise about the
proposed development so that these matters can be recorded and
thereafter fed back to the prospective applicant in order to inform
the development of their proposed formal application for planning
permission; and 
(ii) the matters raised by the Committee also be forwarded to
consultees likely to be involved in any formal application for
planning permission for the proposal.   
Item 8.
Page 179

Page 180

3. BACKGROUND 
3.1 Scottish Government has published guidance which encourages elected
members to highlight any issues with a proposed development at the pre-
application stage which they would wish to see taken into account within any
formal application for planning permission. 
3.2 Following consideration by this Committee on 11 November 2014 it was
agreed that any PAN received after this date would be reported to Committee
to give Members of the Committee, and the Council, the opportunity to identify
any key issues/provisional views about the proposed development and that
these matters be reported back to applicant (paragraph 4 of the Minute
refers). 
3.3 This current report is not about the merits of the proposed development but
rather, based on local knowledge of local issues and wider concerns, etc.
Members are invited to identify any matters relevant to the proposal.  These
will be reported back to the prospective applicant for their information and
attention, and to inform the development of the proposed application.  It is
also proposed that, for information, Members’ comments be forwarded to
consultees likely to be involved in any formal application for planning
permission for the proposal. 
3.4 This PAN relates to the proposed formation of a quarry for the extraction and
processing of sand and gravel and production of ready-mix concrete on
agricultural land to the south-east of Dykeside Farm, Birnie, Elgin. Once
exhausted the land will be re-instated to be suitable for agricultural use, with
mixed woodland and wetland. A plan is appended showing the location of the
site (Appendix 1). The site extends to 14.2 hectares and is located within the
Elgin Countryside Around Towns designation identified in the Moray Local
Development Plan 2020, three kilometres to the south of Elgin. SEPA maps
indicate that parts of the site are at risk of pluvial flooding. The northwest
corner of the site also falls within the buffer of a High Pressure Gas
Transmission Pipeline that runs to the north (outwith) of the site.   
3.5  Planning permission is required for this proposal. The proposal is for a
minerals extraction site which exceeds 2 hectares and therefore under the
current hierarchy regulations it would comprise a major development for
planning purposes.  As such, the proposal will be subject to PAN and pre-
application consultation procedures with the local community.   
3.6 A formal response has been issued to the applicant’s agent to confirm that the
proposed arrangements for engaging with the local community are sufficient. 
The applicant proposes to consult with the Heldon and Elgin Community
Councils and ward councillors. The applicant’s agent has been advised that
no additional parties require to be notified with a copy of the PAN. 
3.7 The PAN advises that two public events will be held at Birnie Public Hall on 27
February and 19 March 2024. The events require to be advertised locally in
advance and allow an opportunity for feedback upon the proposal.  It also
advises that a letter drop will be carried out notifying all residents within 500
metres of the application boundary of the proposed events and confirms that
Page 180

Page 181

the proposals will be available to view online during February and March. For
validation purposes for a major application, the applicant is required to submit
a pre-application consultation report setting out the steps taken to consult with
the local community together with details of comments made on the proposal
and how the applicant has responded to all comments made on the proposal
in the development of the application. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Identifying key issues at an early stage to assist with front loading major
planning applications is a vital aspect of supporting and facilitating the
Council’s priority for economic development in Moray. 
(b) Policy and Legal
Scottish Government guidance on the role of councillors in pre-
application procedures affords elected members the opportunity to offer
general provisional views on forthcoming developments which are the
subject of a PAN where the details of the development have yet to be
finalised. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts
None. 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, the Legal Services Manager, the
Development Management and Building Standards Manager, the Equal
Opportunities Officer, the Strategic Planning & Delivery Manager, and
Lissa Rowan (Committee Services Officer) have been consulted, and
comments received have been incorporated into the report. 
Members of Moray Council who are not on this Committee have also
been consulted and any views received on the proposal will be made
known at the meeting.
Page 181

Page 182

5. CONCLUSION 
5.1 The Council has received a PAN intimating that a formal application for
planning permission will be submitted for a major development
proposal, in this case for permission for the formation of a quarry to
extract and process sand and gravel and produce ready-mix concrete. 
The Committee (and any other Member(s) of the Council) are asked to
identify any provisional views/relevant issues which they would wish to
see taken into account and inform the development of the proposal. 
Author of Report: Richard Smith 
Principal Planning Officer 
Background Papers: 
Ref: 24/00058/PAN 
Page 182

Page 183

Birnie
Thomshill
The Kennels
The Level Farm Cottages
Wood of Level
Castle Hill Wood
GlenlossieRoad
Castle Hill
Track
62m
47m
52m
53m
56m
57m
57m
55m
45m
50m
55m
60m
75m
65m
Barholm
Castlehill
1:5000
COMMITTEE SITE PLAN
Proposed formation of quarry extraction and processing
of sand and gravel and production of ready-mix concrete
on land 740m Southeast of Dykeside Farm Birnie Elgin
ELGIN
Application Reference Number:
24/00058/PAN
(c) Crown Copyright. The Moray Council 100023422 2024
.0 1,000 2,000500
Meters
Item 8.
Page 183

Page 184

Page 184

Page 185

REPORT TO: PLANNING AND REGULATORY SERVICES COMMITTEE ON 12
MARCH 2024 
SUBJECT: 24/00162/PAN – REVISED PROPOSAL FOR THE
DEVELOPMENT OF HOUSING ASSOCIATED LANDSCAPE AND
INFRASTRUCTURE IN THE AREA IDENTIFIED IN THE
BILBOHALL MASTERPLAN AT R2 BILBOHALL, ELGIN 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee that a Proposal of Application Notice (PAN) was
submitted on 30 January 2024 on behalf of Moray Council. 
1.2 This report is submitted to Committee in terms of Section III (E) (1) of the
Council’s Scheme of Administration relating to exercising the statutory
functions of the Council as a Planning Authority. 
2. RECOMMENDATION 
2.1 It is recommended that:  
(i) in noting the terms of this report, the Committee advise upon any
provisional views/relevant issues that Members of this Committee
(or any other Member(s) of the Council) wish to raise about the
proposed development so that these matters can be recorded and
thereafter fed back to the prospective applicant in order to inform
the development of their proposed formal application for planning
permission; and 
(ii) the matters raised by the Committee also be forwarded to
consultees likely to be involved in any formal application for
planning permission for the proposal.   
3. BACKGROUND 
3.1 Scottish Government has published guidance which encourages elected
members to highlight any issues with a proposed development at the pre-
Item 9.
Page 185

Page 186

application stage which they would wish to see taken into account within any
formal application for planning permission. 
3.2 Following consideration by this Committee on 11 November 2014 it was
agreed that any PAN received after this date would be reported to Committee
to give Members of the Committee, and the Council, the opportunity to identify
any key issues/provisional views about the proposed development and that
these matters be reported back to applicant (paragraph 4 of the Minute
refers). 
3.3 This current report is not about the merits of the proposed development but
rather, based on local knowledge of local issues and wider concerns, etc.
Members are invited to identify any matters relevant to the proposal.  These
will be reported back to the prospective applicant for their information and
attention, and to inform the development of the proposed application.  It is
also proposed that, for information, Members’ comments be forwarded to
consultees likely to be involved in any formal application for planning
permission for the proposal. 
3.4 This PAN relates to a proposal for a housing development plant and
associated infrastructure.  This is a revision to planning permission
(20/00905/APP) which was granted in 2022 for a larger development of 194
units covering the wider Bilbohall Masterplan Area encompassing the Elgin
R2, R3 and R7 sites.  The current proposal relates only to the Elgin R2 site as
identified in the MLDP which has an indicative capacity of 75 units.  The
proposed number of units is not stated in this PAN but is anticipated to be
around 106.  All approved and proposed units are social housing.   
3.5 The application site is identified as Elgin R2 in the MLDP 2020 and forms part
of the Bilbohall masterplan area. The site extends to 5.4ha and is located on
open land at the south west of Elgin. The site is served by Edgar Road to the
east.  Elgin High School abuts the site to the south and Greenwards Primary
to the east.  The Wards Wildlife Site is to the north east.  There is an electrical
substation to the west.  Pockets of surface water flood risk are identified
across the site on the SEPA flood Risk Maps. 
3.6  Planning permission is required for this proposal. The proposal is for a
residential development where the site exceeds 2ha and it is anticipated that
more than 50 houses will be proposed therefore the proposal is a major
development for planning purposes. The proposal will be subject to PAN and
pre-application consultation procedures with the local community.  The
applicant(s) have been advised of the Council’s pre-application advice service
to assist in identifying key issues and information that would be expected to
accompany any formal application. 
3.7 A formal response has been issued to the applicant’s agent to confirm that the
proposed arrangements for engaging with the local community are sufficient.
The applicant proposes to consult with Elgin Community Council.  In this case
the applicant’s agent has been advised that no additional parties require to be
notified with a copy of the PAN. 
Page 186

Page 187

3.8 The regulations in relation PAC (The Town and Country Planning (Pre-
Application Consultation) (Scotland) Amendment Regulations 2021) refers)
now require a minimum of two public events for all PANs submitted after 1
October 2022.  The final event is primarily about feedback on the views
gathered during PAC.  In this case, the PAN advises that public events will be
held in Elgin at times to be confirmed.  Each event requires to be advertised
locally in advance and allow an opportunity for feedback upon the proposal.
For validation purposes for a major application, the applicant is required to
submit a pre-application consultation report setting out the steps taken to
consult with the local community together with details of comments made on
the proposal and how the applicant has responded to all comments made on
the proposal in the development of the application. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Identifying key issues at an early stage to assist with front loading major
planning applications is a vital aspect of supporting and facilitating the
Council’s priority for economic development in Moray. 
(b) Policy and Legal
Scottish Government guidance on the role of councillors in pre-
application procedures affords elected members the opportunity to offer
general provisional views on forthcoming developments which are the
subject of a PAN where the details of the development have yet to be
finalised. 
(c) Financial implications
None 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
Depute Chief Executive (Economy, Environment and Finance), the Head
of Economic Growth and Development, the Legal Services Manager, the
Page 187

Page 188

Development Management and Building Standards Manager, the Equal
Opportunities Officer, the Strategic Planning & Delivery Manager, and
Lissa Rowan (Committee Services Officer) have been consulted, and
comments received have been incorporated into the report. 
Members of Moray Council who are not on this Committee have also
been consulted and any views received on the proposal will be made
known at the meeting. 
5. CONCLUSION 
5.1 The Council has received a PAN intimating that a formal application for
planning permission will be submitted for a major development
proposal, in this case for permission for revised proposal for the
development of housing associated landscape and infrastructure in the
area identified in the Bilbohall Masterplan.  The Committee (and any
other Member(s) of the Council) are asked to identify any provisional
views/relevant issues which they would wish to see taken into account
and inform the development of the proposal. 
Author of Report: Lisa MacDonald, Senior Planning Officer
Background Papers: 24/00162/PAN
Ref: 
Page 188

Page 189

861600.0000
861650.0000
320900.000
320950.000
Sign
IC
IC
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Stay
Stay
Stay
RE
RE
RE
RE
RE
Duct
STN01
24.939
STN02
21.890
STN03
21.283
STN04
22.753
STN05
29.402
STN06
27.499
BASE
STNA
STNB
STNE
STND
STNC
STNF
STNZ
STNI
FH
FH
FH
FH
MKR.
MKR.
MKRs
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
JBox
Bollard
Bollard
Bollard
CCTV
Bollard
GasGas
Gas
Gas
GasSVs
GasSV
GasSV
GasSV
SV's
SVSV
SV
SV
SV
SV
SV
SV
SV
SV
SV SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
MKR.
SV's
SV
SV
FH
SV
SV
SV
SV
SV
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
Bore
Hole
38
38
38
38
38
38
28
28
28
28
28
28
28
28
28
28
28
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24 24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
38
40 40
40
42
42
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
28
28
28
28
28
14
14
14
14
14
22
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
30
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28 28
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26 26
26 26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
30
30
30
30
30
30
30
30
30
30
30
30
30
16
16
16
16
16
16
18
18 18
16
16
16
16
30
30
28
28
16
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
32
32
32
32
32
32
32
32
32
32
32
32
32
32
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
14.0
14.0
14.0
26.0
26.0
26.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
20.0
20.0
20.0
20.0
20.0
20.0
22.0
22.0
22.0
22.0
24.0
24.0
24.0
24.0
24.0
24.0
30.0
30.0
30.0
30.0
28.0
28.0
28.0
28.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
30.0
20.0
20.0
20.0
20.0
20.0
14.0
14.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
18.0
32.0
32.0
32.0
32.0
32.0
34.0
34.0
34.0
34.0
36.0
36.0
36.0
36.0
38.0
38.0
14.0
Vent
Vent
StayStay
Stay
Stay
Stay
Stay
Stay
CL
21.93
CL
22.75
CL
23.36
CL
23.25
CL
24.87 CL
24.83
CL
25.14
CL
25.28
CL
21.75
26.33
CL
18.66
CL
18.67
CL
18.25
CL
18.29
CL
18.28
CL
18.42
CL
17.82
CL
17.14
CL
16.37
CL
20.41
CL
20.47
22.06
FL
20.26
FL
21.34
CL
21.41
24.25
21.31
28.47
28.32
28.35
28.04
27.39
26.87
26.72
27.28
28.13
29.02
29.40
29.58
29.59
29.47
29.51
29.45
29.43
29.42
29.40
29.46
28.43
28.39
28.48
28.17
28.56
28.60
28.63
28.70
28.73
28.87
28.99
29.11
29.27
29.28
29.30
29.25 29.94
30.02
29.98
30.13
30.23
30.32
24.84
24.66
24.70
24.79
24.79
24.89
22.3922.27
22.45
22.94
23.82
22.99
23.03
30.33
30.33
30.32
30.20
30.24
30.12
29.78
29.26
35.39
35.62
35.83
34.38
34.92
21.36
20.93
20.98 21.13
21.25 21.24 21.25
21.42
21.49
21.64
21.47
21.08
20.82 20.67 20.35
20.09
20.01
20.01
19.98
20.02
16.38
15.44
15.68
16.02
16.08
15.92
16.32
16.50
16.55
16.70
16.82
16.99
17.22
17.63
17.68
16.3516.28
16.34 16.37
16.31
16.13
16.02 15.78
15.91
15.71
15.05
15.0815.24
15.01
15.11
15.2315.20
15.2415.29
15.4015.42
16.13
15.60
15.52
15.72
15.49
15.19
15.10
14.80
14.72
14.75
14.85
14.98
14.76
14.81
14.68
15.40
15.78
15.87
16.26
16.29
15.67
15.55
15.45
15.21
15.06
15.07
15.17
15.19
15.1215.2315.3415.51
15.5215.49
15.5715.55
15.63
15.59
15.54
15.29
15.06
14.71 14.57
14.76
14.76
14.47
14.43
14.58
14.90
15.02 14.73
14.63 14.47 14.56
14.44
14.87
14.44
14.41
14.36
14.03
14.0114.66
14.68
14.31
14.36
14.59
14.44
14.48
14.36
14.46
14.4814.66
14.6514.90
14.95
15.03
14.87
15.05
14.78
15.55
16.28
17.13
17.61
17.66
18.01
18.03
17.94
17.35
17.51
17.22
17.22
16.95
16.87
16.27
15.77
15.70
15.53
15.63
15.65
15.76
15.77
14.96
14.06
14.15
14.07
13.74
13.56
13.39
16.98
17.35
17.73 17.89
16.76
16.9316.54
16.75
18.20
18.49
18.59
18.52
18.44
17.89
18.52
18.52
17.89
17.85
18.02
16.56
16.71
15.93
16.23
15.87
15.37
14.90
14.80
15.49
15.77
16.12
16.26
16.59
16.75
16.69
16.38
16.06
15.95
15.47
14.83
14.83
14.69
14.84
14.92
14.93
15.18
14.87
15.19
15.15
14.62
14.27
13.85
14.08
14.21
16.53
16.2916.07
16.10
16.40
16.73
16.67
16.89
16.99
16.88
16.91
17.03
14.65
14.68
14.6114.7514.76
14.58
14.77
14.85
15.07
15.07
15.18
15.19
15.26 15.17
15.08
15.10
14.90
14.77
14.70
14.83 14.72 14.70 14.61
14.94 14.99
14.89
14.78
14.57
14.43
14.35
14.38 14.33 14.23 14.26
14.47
14.8014.72
15.1415.27
15.41
15.68
15.89
15.83
15.91
16.11
16.25
16.46
16.73
16.88
16.44
15.86
15.76
15.35
15.21
15.16
15.01
14.86
14.98
14.85
17.85
17.44
17.12
17.18
16.41
16.06
16.28
16.79
17.09
17.35
17.42
17.60
18.0118.09
19.37
19.24
19.22
19.09
17.85
18.11
18.53
18.71
18.74
18.92
18.92
18.78
18.91
18.66
18.66
18.56
18.39
18.41
18.32
18.08
17.78
17.64
17.55
17.34
17.22
17.07
17.22
17.24
17.30
15.98
16.1516.21
15.99
15.86
15.80
15.98
16.19
16.04
16.12
15.75
15.66
15.83
15.68
15.79
15.89
15.98
15.82
15.35
15.07
15.11
14.99
14.93
15.13
15.54
15.26
15.47
15.92
16.39
17.06
17.62
17.74
17.7417.7717.71
21.03
21.24
20.76
20.52
20.7020.74
20.71
20.72
20.54
20.41
20.30
20.76
20.62
20.63
20.78
20.48
20.62
20.65
20.80
21.02
21.14
20.57 20.24
19.69
19.43
19.44
19.50
19.77
19.47
19.4019.49
20.76
21.07
21.05
20.96
21.2921.35
20.85
21.02
21.24
21.37
21.48
21.34
21.14
20.69
20.81
20.87
21.01
21.09
21.42
21.55
21.73
21.80
37.13
36.84
37.40
37.81 37.94
38.41
38.20
38.44
38.48
38.67
38.83
15.61
15.39
15.51
23.72
25.16
29.00
IL
15.82
IL
15.85
24.75
22.04
21.3721.5421.5721.64
21.68
21.32
21.51
21.74
21.8921.95
22.11
22.28
22.41
22.62
22.7522.77
21.78
21.85
21.8821.95
22.1622.20
22.33
22.48
22.6622.67
22.70
22.85
23.19
23.26
23.47
23.83
23.85
24.22
24.29
24.69
24.77
24.92
25.02
25.13
24.85
24.76
24.70
24.72
24.72
24.74
24.74
24.77
24.76
24.78
24.54
24.49
24.28
23.87
23.52
23.46
23.39
23.33
24.78 24.77 24.73
24.70
24.2124.3924.52
24.7124.8624.93
24.96
25.04
25.38
25.55
25.46
24.75
24.30
24.19
23.99
23.84
23.20
22.79
22.70
22.33
24.6124.66
24.76
24.82
24.85
24.97
25.00
25.01
25.02
25.04
25.0725.10
25.13
25.12
25.18
25.19
25.07
25.09
25.19
25.14
25.12
25.10
25.08
25.08
25.24
24.95
24.91
24.88
24.88
24.87
24.86
24.83
24.85
24.85
24.87 24.89
24.88
24.86
24.87
24.90
25.03
25.19
25.39
25.2925.38
25.48
21.47
21.47
21.57
21.58
21.58
21.57
21.48
21.51
21.68
21.70
21.80
21.82
21.92
22.02
22.16
22.26
22.32
22.33
22.35
22.39
22.49
22.75
22.73
22.75
22.88
23.27
23.94
24.09
24.30
24.41
24.78
25.06
21.75
21.37
21.39
21.73
21.98
22.03
22.08
22.05
22.12
22.17
22.22
22.19
22.20
22.26
22.32
22.32
22.17
18.23
18.17
18.1718.22
18.89 18.87
18.89
18.90
18.90
18.92
18.91 18.83 18.73
18.62
18.63
22.11
22.11
21.96
21.94
22.06
21.56
21.47
21.47 21.39
21.38
21.24
22.21
22.10
21.91
21.73
21.47
21.14
20.68
20.44
20.87
20.96
21.02
21.04
20.49
20.44
20.42
20.42
20.40 20.41
20.45
20.48
21.55
21.57
21.61
21.71
21.87
21.84
21.81
21.79
29.19
21.39
21.37
29.78
29.82
28.89
27.49
21.23
20.54
21.88
26.64
27.20
27.73
28.04
28.11
28.17
28.14
28.19
28.16
28.23
28.28
28.35
28.42
28.50
28.61
28.72
28.86
28.98
29.06
29.10
29.17
28.8428.81
28.98
29.06
26.73
27.28
27.80
28.06
28.10
28.16
28.17
28.20
28.14
28.19
28.25
28.34
28.40
28.52
28.64
28.75
28.87
28.99
29.01
29.00
29.24
29.41
29.60
29.73
29.38
29.59
29.70
29.89
22.83
22.92
23.23
23.53
23.81
24.12
29.89
29.90
29.87
29.83
29.64
29.49
29.31
29.08
28.87
28.58
28.38
28.23
28.13
27.92
27.79
27.66
27.56
27.54
27.48
27.41
27.35
27.37
27.40
27.44
27.51
27.60
27.77
27.89
28.05
28.13
28.21
28.27
28.32
28.38
28.43
28.50
28.57
28.69
28.80
28.96
28.79
28.51
28.35
28.19
28.09
27.91
27.80
27.69
27.57
27.53
27.44
27.41
27.47
27.45
27.42
27.53
27.67
27.80
27.95
28.06
28.16
28.17
28.18
28.21
28.28
28.36
28.43
28.52
28.61
28.72
28.81
29.00
21.28
20.51
20.74
20.83
20.82
20.84
21.08
21.06
20.87 20.83
20.83
20.67
20.77
20.84
20.67
20.65
20.61
20.65
20.66
20.68
20.70
20.75
20.80
20.85
20.91
20.97
21.10
21.24
21.32
22.07
28.50
28.46
26.82
26.11
28.71
29.14
29.33
29.24
29.23
29.19
29.28
29.23
28.63
29.03
29.20
29.11
29.06
29.09
29.10
29.11
28.5928.61
35.42
35.69
35.96
35.90
35.94
35.71
35.60
21.83
21.90
21.76
21.56
21.48
21.35
21.38
21.54
21.50
21.58
21.69
21.78
21.89
22.05
22.31
22.52
22.73
22.77
22.93
23.09
23.25
23.56
23.76
23.96
24.11
24.19
24.28
24.41
24.53
24.65
24.76
25.01
25.21
25.37
25.69
25.89
26.25
26.24
26.10
21.77
21.82
21.97
21.80
21.56
21.59
21.54
21.48
21.47
21.47
21.58
21.77
21.89
22.08
22.19
22.34
22.58
22.83
22.95
23.07
23.17
23.33
23.50
23.80
23.98
24.14
24.30
24.29
24.44
24.55
24.68
24.85
25.08
25.26
25.47
25.68
25.97
26.30
26.41
26.53
26.76
26.28
26.39
26.98
27.66
28.58
29.40
30.15
30.68
26.70 26.57 26.62
26.66
27.05
27.78
28.67
29.51
30.32
30.79
27.25
27.79
28.05
28.14
28.18
28.17
28.21
28.18
28.26
28.31
28.38
28.44
28.53
28.64
28.75
28.88
29.01
29.06
29.07
29.22
28.81
29.02
29.40
29.60
29.73
29.79
21.45
21.62
21.80
21.89
22.0022.05
22.21
22.3622.49
22.68
22.76
23.10
23.19
23.15
22.92
23.22
22.98
23.58
23.32
23.59
23.85
24.1824.4724.77
24.88
25.00
24.96
25.09
25.0325.12
25.05
25.14 24.90
25.18
25.12
25.20
25.15
25.18
25.21
25.17
25.15
25.17
25.09
25.10
24.91
25.25
24.93
24.84
24.82
24.85
24.85
24.90
25.12
25.03
24.91
24.28
23.77
25.23
25.23
25.07
25.35
25.46
25.15
24.65
24.91
25.35
21.39
21.48
21.64
21.68
21.75
21.86
21.71
21.84
21.71
21.98
22.09
22.15
22.25
22.28
22.28
22.32
22.39
22.25
22.42
22.32
22.53
22.55
22.86
23.25
23.88
24.36
24.79
25.48
25.55
29.81
29.87
29.73
29.69
29.58
29.32
29.03
29.06
28.83
28.54
28.37
28.23
28.10
27.91
27.78
27.68
27.56
27.53
27.48
27.50
27.42
27.47
27.48
27.54
27.66
27.80
27.97
28.09
28.17
28.22
28.22
28.28
28.35
28.39
28.45
28.53
28.60
28.72
29.00
18.26
21.43
21.63
21.80
21.72
22.02
21.19
21.09
20.61
20.46
20.45
20.46
20.41
20.45
20.52
20.85
20.71
21.07
20.87
20.85
20.81
20.81
20.90
20.84
20.98
21.07
21.24
21.09
21.11
21.23
21.27
21.39
21.63
21.64
21.86
21.87
21.73
21.71
21.69
21.76
21.76
24.83
23.95
24.41
24.89
24.90
25.00
25.11
21.48
22.19
24.19
24.31
18.35
21.82
21.84
21.79
21.81
22.01
24.8925.09
25.12
24.22
24.87
24.92
24.87
24.98
24.97
25.11
21.58
21.75
21.77
21.76
21.75
22.24
22.21
22.74
23.29
23.98
24.45
24.92
25.55
24.21
24.34
14.86
15.24
15.49
15.73
15.80
15.89
15.94
16.08
16.21
16.35
16.58
16.87
17.15
17.52
18.0318.24
18.20
18.09
17.51
17.13
16.87
16.57
16.34
16.16
16.08
15.93
15.87
15.77 15.69
15.43
15.17
14.84
18.38
21.78
21.75
21.79
21.73
21.77
21.83
21.78
21.75
21.79
21.82
21.8121.81
21.83
21.80
21.82
21.80
21.80
21.88
21.85
21.85
21.83
25.12
25.39
25.23
27.14
21.66
22.17
20.43
22.10
22.0722.11
22.65
23.19
22.17
21.67
21.34
20.99
21.08
20.72
21.72
21.73
21.80
26.59
26.94
23.93
28.50
28.97
29.06
22.35
21.32
24.71
24.76
30.47
29.13
18.30
16.55
16.41
16.70
30.31
28.55
28.60
15.48
14.75
18.26
20.00
29.31
30.83 36.18
27.36
28.20
29.09
29.65
29.69
29.75
29.73
29.62
29.62
29.58
29.56
29.53
29.48
29.51
29.58
29.72
29.73
29.90
29.93
30.12
30.06
30.11
30.29
30.40
30.36
30.43
36.73
37.91
38.22
38.73
38.96
39.10
39.29 39.81
40.35
41.48
42.14
43.00
31.15
30.73
30.18
29.50
28.69
27.88
27.24
26.97
26.79
26.69
26.78
26.68
26.53
26.60
26.55
26.42
26.27
26.28
26.16
26.32
26.13
26.21
26.08
25.94
25.81
25.70
25.74
25.71
25.44
25.24
25.14
25.09
25.14
25.17
25.15
24.99
24.97
24.85
24.49
24.34
24.18
24.06
23.94
23.94
23.98
23.99
24.03
24.32
24.42
24.41
24.38
24.45
24.40
24.28
24.10
24.12
24.14
24.24
24.06
23.75
23.59
23.37
23.29
23.44
23.55
23.64
23.72
23.75
24.12
24.43
24.67
24.79
24.93
25.16
25.38
25.47
25.69
25.95
26.26
26.28
26.40
26.53
26.82
27.07
27.47
27.55
27.92
28.10
28.11
28.26
28.19
27.99
27.49
26.99
26.45
28.99
29.13
29.18
29.16
29.00
28.98
28.88
28.94
28.96
29.03
25.44
25.17
24.72
24.43
24.18
23.92
24.13
24.11
24.34
24.53
24.86
25.46
26.02
26.51
27.13
27.69
28.59
28.99
29.96
30.88
30.76
29.44
29.47
29.47
29.43
29.52
29.69
29.70
29.24
29.57
29.66
29.48
29.44
29.29
29.07
28.64
28.61
28.21
27.69
27.09
26.33
26.20
25.56
24.99
24.37
23.90
23.17
22.57
22.17
21.02
20.81
20.63
20.82
20.80
20.82
20.76
20.76
20.94
21.28
21.60
21.94
21.96
21.99
22.26
22.13
22.29
22.54
22.84
23.03
23.22
23.55
24.09
24.46
24.76
25.12
25.22
25.32
25.24
25.40
25.51
25.45
21.45
21.71
21.8622.10
22.19
22.28
22.50
22.62
22.80
22.7423.01
23.32
23.62
23.97
24.34
24.65
24.78
30.42
30.40
30.28
30.10
29.84
28.98
28.64
28.45
28.25
28.26
28.17
28.07
27.95
27.89
27.74
27.78
27.84
27.89
28.12
28.22
28.26
28.31
28.34
28.29
28.36
28.37
28.41
28.59
28.63
28.65
28.82
28.92
29.13
29.34
29.69
30.23
30.49
28.44
28.27
28.15
28.06
27.93
27.76
27.60
27.46
27.49
27.48
27.42
27.38
27.38
18.24
18.17
18.12
17.77
17.62
17.17
16.51
16.51
16.56
16.54
16.32
16.27
16.14
16.01
16.04
16.00
16.09
16.19
16.27
15.72
16.03
15.75
15.61
15.59
15.67
15.79
15.78
15.82
15.94
15.95
16.00
16.13
16.40
16.44
16.67
16.64
16.46
16.46
16.48
16.60
16.65
16.77
17.06
17.39
17.45
17.77
18.41
18.55
19.00
19.17
19.53
19.90
20.15
20.20
20.32
20.61
20.90
21.13
21.39
21.67
21.97
21.86
21.85
21.73
21.7021.74
21.65
21.44
21.3421.48
21.88
22.07
22.32
28.50
28.43
28.24
15.02
15.13
15.08
14.64
18.65
18.77
18.98
18.93 18.67 18.67
18.31
18.10
17.55
17.69
17.48
17.37
17.25
17.22
17.21
17.44
13.76
13.67
13.48
13.32
13.89
14.04
14.59
20.04
20.50
20.39
20.69
20.84
21.07
21.29
21.50
21.81
21.46
30.80
30.44
29.75
29.43
32.06
33.36
34.60
35.75
25.40
27.02
27.13
27.17
27.12
23.73
24.42
24.64
16.52
19.37 19.32
18.86
19.26
19.26 19.34 19.45 19.39 19.40
19.38
19.33
18.75 18.83
19.00
19.01
18.95
18.95
20.47
20.43 20.32
19.89
19.41
19.38
19.48
19.96
19.46
18.74
18.58
18.46
25.68
25.75
25.75
25.8925.88
22.02
22.0122.09
22.21
22.2422.23
22.2122.49
22.58
22.72
22.78
22.83
22.78
22.84
23.06
23.33
23.40
23.97
23.58
23.41
23.42
23.69
23.40
23.27
23.31
23.56
23.78
24.1424.47
24.66
24.89
24.99
24.98
24.96
24.91
24.77
25.16
25.14
25.32
25.38
25.34
25.27
25.32
25.39
25.8925.73
25.20
25.27
25.24
25.33
25.27
25.32
25.19
24.9925.00
25.48
25.12
25.0825.05
24.44
24.80
24.88
24.91
25.27
24.54
24.66
24.8724.85
24.94
24.84
24.99
25.00
25.09
25.05
25.06
25.03
25.03
25.08
25.08
25.0625.07
21.72
21.82
21.78
21.79
21.79
21.79
21.63 21.64
22.17
22.22
22.27
22.15
22.32
22.19
21.75
20.69
20.43
20.37
20.38
22.42
22.35
22.44
22.46
22.27
22.25
22.37
22.36
22.42
22.79
25.59
25.52
25.41
25.23
25.07
24.87
24.85
24.1624.20
25.48
25.68
25.64
25.44
24.99
22.77
22.9722.98
23.03
23.03
23.44
24.02
24.1224.11
29.79
22.19
29.75
29.79
29.73
29.75
29.66 29.65
29.59
29.32
29.15
29.23
29.01
28.68
28.46
28.33
28.18
28.01
27.85
27.77
27.61
27.92
27.87
27.72
27.60
27.57
27.54
27.50
27.48
27.45
27.57
27.68
27.88
27.91
27.91
27.91
27.47
27.52
27.75
14.06 14.03
14.06
16.21
16.20
16.20
15.85
15.91
21.82
21.74
21.72
21.7321.64
21.62
21.11
21.34
21.05
21.06
21.13
20.93
21.11
20.59
20.48
21.81
21.75
22.84
22.94
22.88
22.53
21.94
20.91
20.57
20.34
20.19
19.98
19.55
18.96
18.26
18.2118.30
18.51
19.23
19.62
20.13
20.46
20.56
20.68
20.93
21.30
21.43
21.45
21.48
21.81
22.29
22.41
22.29
22.15
22.51
22.67
21.69
21.85
21.81
21.96
22.11
22.30
22.35
21.71
21.92
22.04
22.26
22.39
21.83
21.83
25.35
20.43
20.50
28.31
28.49
28.67
29.10
29.28
29.19
29.20
29.16
29.21
29.21
29.57
29.40
29.26
29.21
29.32
28.19
28.65
24.42
22.77
27.77
28.02
28.15
28.10
28.24
28.23
28.36
28.31
28.36
28.36
28.47
28.53
28.52
28.61
28.72
28.85
29.05
30.73
31.36
32.33
33.35
33.37
34.38
35.55
35.70
36.35
36.38
16.4216.54
16.47
16.68
16.56
17.06
16.84
17.10
16.86
17.38
16.91
17.65
17.08
16.68
17.79
17.14
16.73
18.12
17.47
17.02
16.33
18.56
17.84
17.05
16.30
19.07
18.11
17.09
16.40
19.36
18.61
17.69
16.91
16.34
19.47
18.78
17.81
17.03
16.44
19.64
19.02
18.24
17.51
16.75
16.33
19.57
19.12
18.71
17.95
17.18
16.73
16.46
16.69
17.09
17.57
18.13
18.75
19.17
19.62
20.07
19.49
18.93
18.30
17.79
17.05
16.71
16.84
16.66
17.29
17.96
18.59
19.16
19.86
20.52
20.61
20.00
19.39
18.67
17.93
17.38
17.02
17.23
17.26
17.29
17.57
18.26
19.02
19.69
20.45
21.08
21.00
20.23
19.18
18.28
17.64
17.59
17.70
17.88
18.51
19.28
20.35
21.22
20.90
20.03
18.94
18.35
18.15
18.00
18.44
18.71
19.23
20.06
20.94
20.80
20.11
19.46
19.21
19.80
19.78
20.30
20.93
20.67
20.25
20.27
20.57
20.74
20.92
21.08
21.11
20.94
20.74
15.68
15.76
14.37
14.37
14.39
14.36
14.31
14.27
16.99
15.18
15.78
14.09
13.92
13.90
13.83
13.99
14.15
14.26
14.63
14.88
14.71
14.57
14.24
15.01
14.87
14.65
14.9115.11
15.90
16.67
17.00
17.03
17.13
18.34
18.44
18.17
18.2518.35
18.04
17.90 17.57
17.79
18.3418.30
18.23
18.11
17.89
15.06
14.85
14.76
14.97
14.89
14.92
14.92
14.72
14.82
14.71
15.13
15.66
15.53
14.69
14.6314.65
14.74
15.78
16.26
16.77
26.74
22.10
22.01
21.73
21.38
21.03
20.77
20.55
20.55
20.56
20.56
20.54
20.6420.63
20.91
21.18
21.13
21.64
22.13
22.73
23.41
24.14
24.83
25.58
26.32
27.06
27.81
28.40
28.97
29.42
29.67
29.70
29.47
29.72
29.82
29.55
29.42
29.61
29.69
29.84
29.99
30.55
30.66
30.64
30.45
29.90
29.52
28.75
27.24
26.81
26.06
25.20
24.59
24.20
23.94
23.96
23.22
22.88
23.00
23.17
23.69
24.22
24.81
25.34
25.19
25.09
25.17
25.11
25.03
24.94
24.36
24.02
23.52
23.18
22.84
22.65
22.44
22.26
22.17
21.97
21.59
21.27
21.03
20.81
20.63
20.53
20.53
20.48
20.57
20.68
21.06
21.53
22.00
22.56
23.29
24.03
24.84
25.69
26.57
27.43
28.26
28.85
29.35
29.63
29.76
29.73
29.73
30.05
30.21
30.04
30.53
29.86
29.58
29.59
30.02
30.39
30.39
29.44
28.44
27.45
26.61
25.59
24.48
23.39
22.46
21.92
21.51
21.11
20.73
20.68
20.79
21.07
21.25
21.59
22.00
22.41
22.72
22.84
22.74
22.45
22.00
21.65
21.42
21.28
21.14
20.90
20.87
21.18
21.56
21.91
22.68
23.43
24.14
24.08
23.14
22.49
22.15
21.73
21.33
21.06
21.32
21.55
21.70
22.10
22.67
23.14
23.16
23.07
23.12
23.37
23.39
23.64
23.57
23.20
22.64
22.21
21.96
21.58
21.47
21.56
21.91
22.43
22.83
22.19
21.98
21.91
22.01
22.33
22.82
23.41
23.91
24.12
23.91
23.69
23.89
24.29
24.30
24.28
24.49
24.68
24.64
24.28
23.76
23.20
22.77
22.50
22.27
22.38
22.63
23.34
23.20
22.86
22.76
23.05
23.41
24.26
24.81
25.11
25.24
24.94
24.60
24.70
24.90
24.99
25.61
25.89
25.86
25.52
25.05
24.47
23.93
23.53
23.27
23.41
24.05
24.17
23.96
23.90
23.93
24.21
24.80
25.48
26.13
26.61
26.28
25.64
25.16
25.02
25.12
25.28
26.07
26.62
27.02
26.79
26.12
25.11
24.36
24.31
24.39
24.83
25.41
26.19
26.84
27.35
27.58
27.44
26.23
25.52
25.09
25.10
25.10
25.33
26.10
26.88
27.62
28.02
27.99
27.88
26.90
26.03
25.30
25.12
25.31
25.29
25.27
25.17
24.74
24.08
23.55
23.47
23.34
22.55
22.30
26.68
26.82
27.50
27.84
27.84
27.72
27.38
27.00
26.64
26.25
25.84
25.46
25.13
24.80
24.50
24.21
24.00
23.80
23.62
23.48
23.42
23.49
23.48
23.62
23.82
24.15
24.45
24.59
24.76
24.77
24.75
24.74
24.84
24.72
24.66
24.41
24.19
24.19
24.22
24.37
24.59
24.90
25.08
25.19
25.25
25.25
25.23
25.27
25.41
25.61
25.74
25.81
25.95
26.15
26.24
26.32
26.36
26.55
26.54
26.57
26.62
26.83
26.99
27.26
27.36
27.17
27.28
27.76
28.61
29.55
30.19
43.30
42.57
42.12
41.49
40.84
40.08
39.27
38.72
38.40
38.16
38.08
37.96
37.82
37.60
37.36
37.04
36.62
36.28
35.60
34.61
33.45
32.26
31.26
30.51
30.02
29.5629.26
29.18
29.07
28.82
28.55
28.60
28.50
28.43
28.42
28.31
28.18
28.21
28.08
28.06
28.10
28.06
28.01
27.71
27.65
27.69
27.73
27.78
27.93
27.98
28.10
28.32
28.62
28.93
29.30
29.69
29.95
30.14
30.29
30.30
30.26
30.26
30.17
30.00
29.90
29.80
29.67
29.55
29.38
29.29
29.26
29.36
29.49
29.59
29.55
29.57
29.48
29.32
28.94
28.27
27.48
27.76
27.94
27.94
27.74
27.43
27.10
26.71
26.37
25.98
25.64
25.24
24.89
24.59
24.27
24.05
23.92
23.78
23.73
23.78
23.80
24.00
24.33
24.65
24.99
25.24
25.37
25.63
25.74
25.73
25.74
25.90
25.92
25.92
25.61
25.32
25.23
25.31
25.45
25.63
25.87
26.04
26.03
25.96
25.93
25.92
25.92
26.04
26.23
26.48
26.55
26.75
26.89
26.99
27.03
27.15
27.28
27.35
27.38
27.38
27.45
27.60
27.69
27.77
27.52
27.61
28.13
29.04
29.80
30.33
42.65
41.95
41.58
41.16
40.49
39.70
39.02
38.68
38.17
37.87
37.78
37.71
37.64
37.57
37.40
37.17
36.84
36.45
36.06
35.34
34.42
33.30
32.10
31.10
30.42
29.8429.45
29.12
29.00
28.88
28.73
28.58
28.53
28.51
28.42
28.25
28.14
28.06
28.07
28.06
28.03
28.13
27.92
27.72
27.60
27.64
27.68
27.80
27.83
27.96
28.09
28.40
28.73
29.08
29.46
29.82
30.08
30.23
30.26
30.23
30.17
30.09
29.90
29.74
29.66
29.59
29.47
29.38
29.33
29.32
29.40
29.56
29.56
29.50
29.44
29.31
29.09
28.73
28.19
27.91
27.99
27.93
27.67
27.45
27.16
26.85
26.58
26.25
25.95
25.63
25.33
25.08
24.80
24.63
24.47
24.39
24.50
24.69
24.81
25.04
25.38
26.91
27.91
28.62
29.30
30.12
30.78
31.33
31.96
32.58
33.14
33.55
33.46
33.05
32.98
32.77
32.58
32.26
32.16
32.15
31.89
32.06
32.33
32.77
33.29
33.41 33.00
32.66
31.44
30.72
29.92
29.83
29.51
27.87
27.31
26.12
24.81
26.48
28.67
30.86
33.00
34.27
34.61
34.82
34.99
34.68
34.38
33.73
32.48
30.58
29.46
30.6330.68
31.23
32.89
33.82
32.57
30.77
28.61
26.36
24.62
24.86
26.53
28.66
30.73
32.36
33.68
34.41
34.65
34.81
34.99
35.22
35.40
35.63
35.53
35.78
35.5235.49
35.68
35.64
35.48
35.58
35.53 35.60
35.58
35.88
35.84
35.83
35.67
34.47
33.85
32.54
30.76
28.40
26.11
26.63
29.05
27.92
25.60
24.63
26.56
28.68
27.62
25.65
24.06
25.56
27.68
29.77
31.98
33.65
34.39
34.65
34.99
34.84
34.88
34.68
34.27
33.29
31.76
29.68
27.52
25.42
26.21
28.32
30.42
32.30
33.80
34.63
34.06
33.02
31.32
29.08
26.89
24.97
24.94
26.84
28.83
30.81
33.14
34.42
35.05
34.08
32.45
30.66
28.60
26.42
24.76
25.77
27.84
29.86
31.97
34.12
35.40
35.36
34.38
32.67
30.62
28.68
26.78
24.95
25.41
26.79
26.89
26.99
27.18
27.38
27.54
27.50
27.21
26.88
26.82
27.22
27.53
27.78
27.93
28.00
28.05
28.18
28.33
28.47
28.59
28.60
28.74
28.77
28.69
28.29
28.10
28.20
28.85
41.94
41.36
41.11
40.65
40.01
39.25
38.44
37.75
36.96
36.11
34.98
33.76
30.77
28.84
27.35
28.39
30.06
31.75
33.22
34.46
35.47
36.50
37.38
38.23
38.35
37.24
36.21
34.95
33.69
32.11
30.46
28.81
27.31
28.34
30.06
31.81
33.61
34.88
36.09
37.39
38.67
39.92
39.16
37.51
36.37
35.24
33.98
32.34
30.60
28.62
27.18
28.32
29.99
31.54
33.06
34.47
35.55
36.59
38.77
40.41
41.40
41.33
40.85
39.23
37.24
35.53
34.44
33.09
31.29
29.53
28.04
27.58
29.04
30.68
32.23
33.37
34.40
35.86
37.57
39.42
41.17
42.84
40.52
38.18
36.05
34.47
33.01
31.80
30.45
28.44
27.07
27.62
28.73
30.34
31.68
32.79
34.66
36.71
39.06
36.85
34.76
33.01
31.82
30.67
29.12
27.87
27.90
29.02
30.09
31.09
32.56
34.67
31.86
30.46
29.28
28.16
28.59
29.80
31.37
29.95
28.73
27.88
28.19
29.21
28.6842.82
41.87
41.16
40.48
39.68
39.02
38.60
38.18
37.83
37.46
37.20
37.15
37.08
37.09
37.02
36.88
36.56
36.27
35.27
33.71
31.64
30.70
30.02
29.57
29.29
29.13
28.99
28.82
28.64
28.54
28.40
28.26
28.07
28.04
28.07
27.99
27.93
27.84
27.69
27.64
27.62
27.71
27.74
27.79
28.00
28.48
28.96
29.58
29.98
30.32
30.40
30.42
30.50
30.49
30.51
30.64
30.6230.60
30.58
30.4230.42
30.34
30.35
30.32
30.40
30.39
30.28
30.13
30.07
30.00
29.96
29.88
29.91
29.95
29.75
29.44
29.11
28.55
28.01
28.01
28.11
27.99
27.91
27.65
27.34
27.02
26.71
26.36
25.75
25.44
25.22
25.29
25.66
26.07
26.15
27.60
27.08
26.49
26.03
25.93
26.01
26.23
26.55
26.95
27.16
27.61
27.83
28.09
28.31
28.34
28.38
28.39
28.71
28.79
28.85
28.83
28.71
28.51
28.38
28.23
28.01
27.60
27.18
26.84
26.59
26.68
27.29
28.15
28.56
27.53
27.83
27.43
27.45
27.81
28.23
28.61
28.94
29.01
29.03
29.02
29.16
29.24
29.18
29.02
28.92
29.26
29.39
29.68
29.81
29.74
29.67
29.68
29.73
29.70
29.49
29.10
28.56
28.18
28.14
28.27
28.82
29.84
31.16
32.05
33.22
33.35
33.22
33.47
33.39
34.34
34.90
34.91
34.80
34.74
34.75
34.87
35.25
35.42
35.36
35.39
35.55
35.73
35.91
35.82
35.56
35.22
34.93
34.90
35.17
36.08
36.42
36.18
35.85
34.94
34.36
34.74
34.76
34.29
33.66
33.44
33.47
33.75
34.06
34.44
34.54
34.44
34.34
34.40
34.53
34.78
33.35
32.87
32.60
32.61
32.76
33.05
32.96
32.72
32.35
32.05
31.91
32.09
32.53
32.99
33.57
33.87
33.79
33.61
32.14
31.89
32.15
32.06
31.54
31.20
30.84
30.68
30.84
31.01
31.32
31.48
31.40
31.16
30.76
30.70
31.00
30.39
28.50
28.16
28.55
29.00
29.23
29.48
29.40
29.21
28.96
29.12
29.13
29.32
29.48
29.44
29.54
29.84
30.53
32.04
33.58
35.67
36.75
37.40
37.55
37.30
37.12
36.98
36.76
36.91
36.97
37.05
37.15
37.15
37.28
37.54
37.64
37.65
37.28
36.61
37.17
37.81
38.19
37.72
37.47
36.94
37.19
37.05
36.40
35.95
35.88
36.07
36.40
36.81
37.11
37.21
37.00
36.55
36.32
36.09
35.88
35.79
35.67
35.41
35.02
34.79
34.86
34.96
35.05
34.69
33.78
32.91
32.11
31.33
30.32
29.57
28.84
28.42
28.38
28.44
28.82
29.24
29.72
30.12
30.31
30.29
30.15
29.97
29.94
29.92
29.78
29.93
30.01
30.03
30.16
30.29
30.43
30.49
30.49
30.23
29.87
29.37
28.95
28.63
28.46
28.59
29.10
29.65
30.20
30.89
31.48
32.25
33.23
34.64
35.26
35.13
34.86
34.76
35.11
35.63
35.84
35.98
36.26
36.51
36.93
37.50
37.60
37.13
36.69
36.33
36.19
36.49
37.13
37.04
36.80
36.65
36.63
36.69
36.80
37.16
37.23
37.25
37.18
36.90
35.89
34.08
32.06
31.0030.23
29.74
29.53
29.37
29.20
29.13
28.95
28.63
28.46
28.25
28.09
28.09
27.99
28.03
27.95
27.87
27.75
27.64
27.71
27.79
27.80
27.92
28.18
28.57
28.87
29.37
29.90
30.23
30.28
30.16
29.91
29.45
29.01
28.98
29.68
30.09
30.45
30.58
30.67
30.57
30.35
30.14
29.98
29.83
29.72
29.99
30.20
30.39
30.63
30.72
30.67
30.42
29.95
29.52
29.74
30.24
30.49
30.66
30.69
30.63
30.46
30.45
30.28
30.13
30.16
30.41
30.54
30.73
30.68
30.57
30.30
30.44
30.63
30.69
30.63
30.39
30.10
29.97
30.19
30.50
30.64
30.71
30.64
30.47
30.30
30.04
29.90
29.78
29.71
29.67
30.46
30.54
30.48
30.76
31.68
33.51
35.61
37.02
37.31
37.23
37.19
37.01
36.85
36.65
36.61
36.69
36.86
36.43
36.26
36.62
36.20
36.42
36.8436.51
36.27
36.41
36.75
37.26
37.59
37.32
37.06
36.70
36.41
36.21
36.11
35.88
35.63
35.13
34.58
34.42
34.68
34.58
33.52
32.09
30.99
30.55
30.12
29.71
29.14
28.76
28.49
28.65
29.19
28.99
28.62
28.57
28.70
29.10
29.54
29.85
30.09
30.33
30.81
31.47
32.35
33.08
33.50
34.03
34.70
35.60
36.01
36.06
36.08
36.37
36.73
37.16
37.35
37.18
36.91
36.46
36.30
36.52
36.53
36.48
36.53
36.84
37.04
37.12
36.82
36.46
36.34
36.21
36.13
35.86
35.15
33.92
32.70
31.95
31.28
30.81
30.33
30.12
29.91
29.76
29.58
29.32
29.08
28.66
28.52
28.58
28.93
29.40
29.88
30.04
30.05
29.65
29.46
28.95
28.68
28.31
28.11
27.98
27.95
27.94
27.85
27.89
27.91
28.00
28.06
28.11
28.11
28.16
28.19
28.28
28.41
28.74
29.05
29.33
29.48
29.49
29.64
29.90
30.12
30.41
30.74
30.45
30.16
30.02
29.92
29.80
29.46
29.05
28.67
28.39
28.18
28.19
28.20
28.12
28.03
27.96
27.96
27.97
27.95
28.06
28.25
28.60
28.92
29.41
29.93
29.44
29.00
28.68
28.41
28.21
28.08
28.12
28.08
28.08
28.15
28.17
28.23
28.20
28.37
28.67
29.02
29.46
29.79
30.17
30.26
30.34
30.52
30.85
31.24
32.05
31.57
31.12
30.90
30.78
30.58
30.16
29.59
29.19
28.79
28.45
28.29
28.28
28.21
28.23
28.16
28.24
28.21
28.18
28.21
28.35
28.38
28.78
29.16
28.69
28.46
28.48
28.57
28.55
28.59
28.41
28.32
28.36
28.41
28.46
28.56
28.80
29.15
29.65
30.14
30.53
30.88
31.05
31.28
31.69
32.18
33.05
34.28
33.74
33.27
32.71
32.37
32.11
31.56
30.84
30.31
29.83
29.37
28.97
28.74
28.58
28.57
28.73
28.78
28.68
28.57
28.56
28.88
29.10
29.26
29.37
29.20
29.24
29.48
29.77
30.30
30.79
31.37
32.20
33.69
34.84
35.65
35.89
35.87
35.98
36.20
36.37
36.44
36.50
36.68
37.04
37.08
36.86
36.52
36.11
35.62
35.26
35.17
35.00
34.42
33.40
32.36
31.16
30.38
29.91
29.39
29.14
28.98
28.91
28.92
28.94
28.99
28.97
28.72
28.75
28.62
28.54
28.49
28.61
28.71
29.07
29.22
29.45
29.95
30.50
31.29
32.22
33.04
33.54
33.69
34.33
35.15
36.18
36.99
36.43
35.50
34.04
32.74
32.34
32.22
31.94
31.42
31.00
30.59
30.01
29.53
29.06
28.72
28.60
28.43
27.99
28.32
28.35
28.36
28.38
28.52
28.64
28.79
28.68
28.54
28.32
28.22
28.01
27.93
27.91
27.87
27.98
27.98
28.13
28.36
28.51
28.73
28.94
29.15
29.05
28.79
28.31
27.65
27.61
27.65
27.88
28.04
28.25
28.10
27.69
27.56
27.59
27.59
27.65
27.76
27.90
28.04
28.24
28.48
28.60
28.82
28.83
28.67
28.44
28.56
28.43
28.22
27.98
27.72
27.58
27.48
27.37
27.29
27.32
27.16
26.69
26.56
26.83
27.29
27.87
28.39
28.29
27.61
27.08
26.71
26.64
27.15
27.78
27.99
27.35
26.79
27.15
27.53
26.67
27.09
28.50
14.77
14.85
15.03
15.30
15.34
15.09
14.86
14.90
15.08
15.31
15.28
15.06
14.87
15.08
15.28
15.55
15.60
15.34
15.15
15.27
15.25
15.66
15.57
15.69
15.24
15.38
16.05
16.01
15.70
15.78
16.21
16.64
17.00
16.33
15.92
15.96
16.88
16.84
16.71
16.64
16.47
16.9017.16
17.40
17.71
18.03
18.23
18.11
17.90
18.1918.25
18.01
17.45
18.25
18.47
18.61
18.72 18.49
18.38
18.12
18.0118.1618.3218.45
19.07
18.91
18.87
18.68
19.04
18.99
16.70
16.92
17.36
17.21
16.71
15.53
15.67
15.57
15.58
15.76
16.56
19.01
19.03
19.00
18.92
19.00
18.89
18.49
18.45
18.43
18.70
18.35
18.63
18.27
18.82
18.64
18.59
18.66
17.34
17.60
17.67
17.96
17.03
17.00
17.23
17.21
17.60
17.71
17.38
16.99
16.90
16.85
16.49
16.54
16.99
17.16
17.78
17.66
18.11
18.16
18.36
17.11
16.90
15.85
15.87
16.10
22.25
21.60
22.21
21.74
21.68
22.08
21.99
21.58
20.84
21.12
21.16
21.24
21.02
21.61
21.69
20.11
19.73
20.08
19.49
19.13
18.71
19.05
19.49
19.74
20.37
20.78
22.04
22.20
20.59
20.96
21.10
20.97
21.17
22.18
22.23
21.76
21.93
21.74
21.54
21.48
21.43
21.41
21.52
21.62
21.72
21.85
21.99
22.11
22.30
22.55
22.72
22.87
23.00
23.12
23.25
23.53
23.75
23.95
24.10
24.25
24.29
24.42
24.54
24.64
24.82
25.00
25.20
25.43
25.60
25.91
26.78
26.64
26.47 26.43
26.40
26.24
26.10
26.98
27.69
28.58
29.44
30.21
30.70
CL
20.89
15.30
21.08
20.57
20.74
20.43
21.87
21.96
21.71
21.61
22.25
22.22
22.19
22.23
22.10
21.90
21.58
21.55
21.61
21.60
21.64
21.70
21.47
21.63
21.04
21.22
21.22
21.26
21.20
21.16
18.92
18.91
18.91
18.86
22.70
22.99
23.25
23.55
23.67
23.61
24.01
24.18
24.64
25.60
15.38
15.22
14.79
14.63
14.62
14.73
14.87
14.82
15.05
15.19
15.30
15.53
15.75
15.88
22.25
22.67
23.32
24.15
24.29
26.46
26.38
25.68
24.69
24.62
24.85
26.82
26.25
25.80
25.29
24.90
24.54
24.04
23.60
23.01
24.64
24.22
23.87
23.43
23.08
22.74
22.31
21.94
21.64
21.39
21.24
21.11
21.05
21.06
18.93
19.14
19.1919.4019.71
19.8920.15
20.19
20.2120.4320.47
20.5820.79
21.0921.3721.43
21.45 22.26
23.22
23.52 23.59 23.39 23.01
22.45 22.12
21.81 21.50 21.53 21.11
20.81 20.43
20.25
19.58 19.17
16.56
15.95
15.62
15.26
19.09
18.98
18.54
18.07 17.07
16.30
16.35 14.87
15.20
15.13 15.23
15.48
15.48
15.49
14.8314.83
16.33
16.28
15.63
15.86
15.98
15.21
15.16
14.78
14.48
13.99
14.01
14.25
14.33
14.21
25.45
25.42
24.78
23.90
23.08
22.52
22.12
22.41
23.12
23.91
24.65
22.49
25.83
24.86
21.31
22.41
25.07
25.30
25.54
25.8225.75
25.44
25.28
25.11
25.02
26.09
25.59
25.14
24.60
24.19
23.76
23.36
22.85
22.42
22.10
21.82
21.61
21.46
21.36
21.24
21.15
21.14
21.11
21.13
21.19
21.19
21.25
21.34
26.40
26.07
25.78
25.49
25.02
24.53
24.18
23.75
23.34
22.86
22.46
22.09
21.83
21.57
21.41
21.31
21.20
21.10
21.11
21.08
21.10
21.16
21.17
21.22
21.23 21.31
21.31
21.27
21.40
22.16
22.38
22.50
22.61
22.58
22.12 21.64
22.6522.68
25.00
25.59
21.74
21.72
21.72
21.72
21.86
21.70
21.84
21.86
22.02
22.14
22.23
22.54
22.54
22.58
23.02
23.11
23.42
23.61
23.93
24.24
24.60
24.99
25.48
26.07
26.46
26.80
26.37
22.91
23.20
23.26
23.57
23.80
24.18
24.55
24.94
25.35
25.97
26.44
26.75
26.31
24.95
24.91
24.88
21.71
21.72
21.74
21.75
21.77
21.78
21.74
21.86
21.91
22.02
22.08
22.32
22.43
25.91
25.75
25.35
25.47
26.72
26.11
25.62
25.13
24.60
24.20
23.76
23.37
22.87
22.46
22.10
21.82
21.57
21.45
21.33
21.22
21.16
21.13
21.11
21.13
21.17
21.19
21.24
21.77
22.16
21.23
21.19
20.76
21.62
21.95
24.17
22.53
13.76
24.62
24.67
24.39
23.74
23.32
22.74
22.21
21.77
21.41
21.23
21.22
21.27
21.14
21.08
21.06
21.06
21.12
21.09 21.08 21.34
22.11 22.82 23.42 23.51 23.72
23.56
23.21
22.72
22.36 21.99 21.96 21.88
21.68
21.23 20.86 20.69 20.34 19.58 18.39 17.73 17.21
16.14
15.36
15.11
14.39
17.33
17.82
18.64
19.86
21.27
22.37
23.21
13.84
13.88
14.08
14.25
14.32
14.37
14.44
14.37
14.76
14.95
23.43
24.19
24.71
25.24
25.69
25.94
25.92
25.70
25.21
24.65
24.09
23.41
22.70
22.05
21.77
21.44
21.38
19.35
19.18
19.16
19.78
20.67
20.98
21.66
21.49
21.25
21.59
22.48
22.78
23.00
23.58
24.94
25.65
26.10
26.96
27.83
28.51
28.97
28.99
29.09
28.49
27.14
25.90
24.98
24.89
21.25
21.19
21.26
21.29
21.37
21.46
21.49
13.72
21.09
21.57
20.82
20.97
21.41
21.36
21.46 21.52 21.44 21.41 21.46 21.26 21.18 20.89 20.85 20.56
20.48
20.36
20.20 20.09 20.04 19.90 19.67 19.50
19.26
19.14
19.05
21.41
21.34
21.45
21.41
20.80
20.39
20.48
20.72
20.08
19.71
19.31
19.23
19.51
19.79
30.20
24.42
24.41
24.79
25.40
25.61
24.96
24.38
24.11
23.33
22.94
22.45
22.66
21.70
21.61
21.47
20.80
20.39
21.42
20.56
20.59
20.05
20.06
21.45
21.35
21.44
22.01
22.69
22.99
23.24
23.42
23.64
23.93
24.25
26.12
24.60
24.99
25.61
25.45
26.04
27.3726.06
26.48
27.88
26.80
28.74
28.13
26.38
26.78
25.92
25.17
25.05
25.47
25.22
25.05
24.36
22.41
22.31
20.84 20.89
21.03 21.88
22.73 23.59 24.31 24.41
24.30
24.12 23.74 23.52 23.41 23.40 23.61 23.31 22.91 22.51 21.92 21.29 20.33
19.24
18.00
16.67
15.26 14.35
13.97
26.05
28.96
28.23
24.82
30.49
25.16
22.52
22.19
21.90
21.93
22.02
22.24
22.22
21.65
21.58
21.37
21.20
21.15
21.06
21.13
21.08
21.13
21.23
21.29
21.26
21.46
21.16
21.16
20.83
20.89
21.07
21.14
21.12
21.37
21.53
21.76
22.05
22.47
22.95
23.51
24.00
24.36
24.69
24.77
24.65
26.24
26.18
26.15
25.93
25.69
25.20
24.62
23.96
23.39
23.00
22.54
22.24
21.93
21.66
21.53
21.42
21.20
22.09
22.46
22.81
22.84
22.99
23.11
23.47
24.07
24.88
25.75
26.73
27.48
27.97
28.09
28.49
28.55
28.25
29.61
29.08
30.25
30.29
29.93
29.56
29.20
28.58
27.71
26.79
25.82
24.99
24.49
24.32
24.35
24.10
23.59
23.06
23.89
24.43
25.13
25.74
25.74
25.83
26.39
27.47
28.35
29.17
29.84
30.23
30.49
30.76
30.89
30.99
30.87
30.48
29.61
30.53
29.15
31.33
31.33
31.30
31.28
31.13
30.88
30.56
30.33
29.97
29.42
28.63
27.87
27.09
26.69
26.66
26.45
25.78
24.92
25.38
26.34
26.75
27.07
27.49
28.10
28.84
29.48
29.98
30.30
30.53
30.83
31.21
31.32
31.50
31.63
31.80
31.77
31.35
30.30
28.86
27.35
27.16
29.12
30.86
31.90
32.06
31.92
31.85
31.70
31.54
31.42
31.20
31.39
30.84
30.55
30.29
30.12
29.79
29.26
28.44
27.56
26.90
26.37
25.72
24.94
24.76
25.51
26.27
27.21
28.18
29.24
29.77
30.19
30.33
30.38
30.69
31.05
31.60
31.69
31.79
31.90
32.06
32.13
32.01
31.30
29.70
29.73
31.26
31.94
32.17
32.18
32.00
31.86
31.85
31.81
31.59
31.30
30.95
30.43
30.31
30.41
30.23
29.74
28.83
27.76
26.54
25.52
24.72 24.46
25.59
27.05
28.34
29.32
30.03
30.47
30.51
30.41
30.56
30.86
31.34
31.83
31.99
31.95
32.00
32.11
32.11
31.98
31.74
31.18
29.89
29.46
30.93
31.71
31.95
32.06
32.11
32.22
32.16
32.04
32.02
31.66
31.13
30.75
30.58
30.55
30.56
30.34
29.83
28.96
27.97
26.63
24.96
24.94
26.76
28.19
29.39
30.01
30.36
30.67
30.73
30.61
30.76
31.25
31.86
32.11
32.15
32.21
32.17
32.11
32.05
31.96
31.41
30.34
28.75
27.63
29.44
30.75
31.35
31.77
31.95
32.16
32.26
32.22
32.17
32.02
31.63
31.06
30.70
30.62
30.72
30.63
30.22
29.58
28.56
27.18
25.58
25.09
26.91
28.62
29.96
30.56
30.71
30.68
30.64
30.78
31.26
31.73
32.07
32.19
32.15
32.00
31.76
31.54
31.00
30.21
29.09
27.74
26.03
26.13
27.64
28.82
29.68
30.64
31.30
31.72
31.94
32.13
32.19
32.01
31.60
31.12
30.96
30.95
30.96
30.68
30.04
28.62
26.75
24.91
22.90
20.41
21.41
21.26
21.12
17.87 17.12 16.78
15.90
14.00
14.11
14.06
14.25
14.46
14.64
14.86
14.94
14.90
14.95
14.98
14.94
15.08
15.24
15.02
15.45
15.55
15.94
16.53
16.88
17.08
17.36
17.22
16.73
16.18
15.45
14.92
16.59
17.76
18.78
19.18
19.55
19.41
19.18
18.62
18.45
17.57
16.82
16.29
17.18
18.51
19.86
21.05
21.92
22.50
22.62
22.64
22.32
21.96
21.06
20.03
18.90
21.11
22.92
24.14
25.08
25.43
25.43
25.34
24.96
24.27
23.46
22.56
21.05
19.30
18.17
18.48
20.27
22.30
23.97
25.38
26.59
27.39
27.68
27.77
27.71
27.33
26.36
24.90
23.08
23.98
26.27
28.15
29.05
29.34
29.25
29.19
28.99
28.38
27.40
25.88
23.75
21.37
19.83
21.29
23.27
25.12
27.11
28.84
29.99
30.20
30.06
30.02
30.13
30.03
29.75
28.45
26.71
24.66
28.89
30.14
30.51
30.68
30.80
31.09
31.42
31.86
32.11
32.00
31.58
31.18
30.52
29.76
28.67
27.75
26.92
26.24
25.90
25.77
26.25
26.95
27.88
28.61
29.34
30.44
31.24
31.64
31.56
31.17
30.61
30.50
30.43
31.07
30.97
30.12
28.66
26.83
24.83
23.22
22.86
23.85
24.28
24.73
25.18
25.13
25.78
26.54
27.16
28.79
25.56
24.47
25.63
27.44
27.69
27.66
27.37
26.79
25.91
25.11
24.6724.95
24.82
24.70
25.07
23.86
23.18
22.65
22.93
23.15
21.93
22.43
21.87
21.54
21.87
21.59
21.68
21.47
21.03
21.69
21.71
21.70
21.83
21.73
21.82
21.85
21.97
22.09
22.27
22.44
22.32
21.60
21.06
20.72
20.08
20.56
19.71
19.87
19.50
19.46
19.25
19.46
19.64
20.29
28.22
28.82
Kiosk
IC
Gu
BTIC
Gu
BTIC
Gu
Gu
Gu
IC
Chamber
BTIC
BTIC
IC
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Gu
Gu
IC
IC
IC
IC
BTIC
IC
IC
BTIC
BTIC
IC
IC
IC
14.63
Gu Gu
18.89
Gu
IC
IC
Gu
Gu
IC
Gu
IC
IC
26.52
21.54
15.51
15.31
14.91
14.80
14.77
14.63
14.72
14.74
14.76
14.78
14.69
14.61
14.72
14.71
14.66
14.67
14.64
14.69
13.55
13.11
13.84
13.72
13.89
13.78
13.78
13.53
13.39
13.5213.18
13.5113.1613.42
13.43
13.80
13.84
13.83
13.81
13.88
13.17
13.64
13.74
13.14
14.00
13.90
13.93
13.86
13.89
13.61
13.55
13.52
13.8013.90
13.79
13.91
14.21
13.2213.71
13.87
13.26
14.19
13.91
13.74 13.94
13.93
13.81
13.70
13.57
13.60
13.66
13.56
13.43
13.6013.79 13.80
13.58
13.83
13.92
14.00
13.92
14.31
13.4013.87
14.06
13.47
14.47
14.25
14.17
14.04
13.88
13.62 13.28
13.94
13.95
13.97
14.00
13.9713.98
13.97
13.96
13.97
13.97
13.97 13.25
13.15
13.23
13.39
13.63
13.79
14.18
14.21
14.30
14.4514.4913.6114.02
14.26
13.90
14.64
14.38
14.42
14.58
14.56
13.50
13.84
13.70
13.9914.23
14.41
14.30
14.04
13.59
14.02
13.41
14.14
14.07
14.64
14.80
14.74
14.81
14.9014.1614.58
14.89
14.31 15.06
14.66
14.67
14.77
14.83
14.17
13.62
14.14
14.1213.4714.34
14.30
14.55
14.91
14.90
14.81
14.89
14.38
14.95
15.02
15.56
15.15
15.01
14.49
14.44
14.54 13.5914.15
14.10
13.49
14.27
14.34
14.98
15.02
15.12
15.06
15.05
15.04
14.64
14.40
14.38
13.32
14.15
14.04
13.42
14.11
13.51
13.95
14.50
14.35
14.29
14.24
14.54
14.64
14.89
14.91
14.99
15.66
15.05
14.72
14.64
14.63
14.30
14.17
13.29
13.98
13.80
13.18
13.90
14.12
14.58
14.50
14.9014.89
14.5915.16
15.06
14.6414.94
14.67
14.53
14.87
13.97
14.85
14.39
14.3814.43
14.02
13.8013.0613.66
13.6612.9213.84
14.13
14.07
13.73
13.71
13.79
13.66
13.8613.39
IL
13.21
13.55
13.83
13.01
13.75
13.84
13.01
12.73
12.71
14.20
12.84
12.75
12.91 12.90
14.04
13.99
13.25
13.26
13.04
14.00
13.10
14.18
14.07
13.2914.23
14.44
13.69
14.28
14.5513.7814.89
14.21
14.07
14.00
13.87
13.81
14.04
13.96
13.94
13.98
13.69 12.53
12.69
13.67
13.69
12.81
12.89 13.67
13.67
13.84
14.00
12.57
13.86
12.62
12.88
12.95
13.94
12.80
12.89
13.68
13.95
13.08 12.85
IL
13.9014.03
13.16
13.85
13.74
14.73
14.65
14.72
14.65
14.74
14.78
14.64
14.74
14.94
14.86
14.75
14.81
14.75
14.79
12.50
12.47
13.05
13.69
15.01
15.06
13.92
14.28
14.25
14.25
14.95
14.25
14.95
14.92
14.88
14.94
14.89
14.98
15.07
CL
14.93
15.13
15.17
15.03
15.08
15.04
15.13
15.18
15.49
15.4015.32
15.37
15.34
15.4815.44
15.77
15.80
15.68
15.72
15.68
15.76
15.83
16.11
16.02
15.98
15.91
16.0415.95
16.10
16.13
16.21
16.25
16.19
16.36
16.27
16.38
16.58
16.66
16.6816.72
IC
16.51
16.63
16.63
16.79
16.64
16.74
16.75
16.78
16.78
16.57
16.40
16.29
16.23
16.14
16.24
16.31
16.60
16.4116.41
16.37
16.43
16.51
16.59
16.59
CL
16.8116.69
16.79
16.94
16.86
16.88
16.98
16.98
16.64
16.83
17.01
17.07
16.89
16.93
17.02
17.0317.06
17.05
16.91 16.91 16.91
16.63
16.85 16.86
16.84 16.82
16.57
16.92
16.93
16.99
16.98
16.9216.86
16.80
16.9717.05
17.03
17.08
17.02
17.03
16.99
17.1117.18
17.23
17.16
17.09
17.06
17.14
17.05
17.06
16.95
16.93
17.02
17.09
17.0417.01
16.89
16.74
16.69
16.62
16.54
16.45
16.5516.5416.42
16.41
16.39
16.29
16.26
16.56
16.54
16.48
16.53
16.36
16.48
16.3716.35
16.36
16.36
16.34
16.51
16.43
16.47
16.47
16.42 16.42
16.46 16.5016.5916.59
16.67
16.79
16.55
16.50
CL
16.80
16.78
16.79
16.8216.79
IC
16.69
16.76
16.67
16.61
17.10
16.50
16.43
16.53
16.55
16.70
16.70
16.92
16.86
16.97
16.97
17.02
16.93
16.90
16.95
16.8416.94
16.80
16.85
16.45
16.51 16.60
16.70 16.65
16.72
15.35
15.28
15.11
15.23
15.20
15.15
16.39
16.79
15.22
15.32
16.53
16.38
15.99
14.88
14.73
15.07
14.99
15.10
14.69
14.63
14.70
14.73
14.71
14.83
14.49
15.00
15.20
15.41
14.86
14.89
14.78
14.81
15.15
14.92
CL
15.10
14.83
14.87
14.83
14.82
14.82
14.74
14.79
14.71
14.68
14.78
14.75
14.72
14.82
14.78
14.82
14.75
14.92
14.95
14.90
14.91
14.89
15.72
15.94
16.47
16.72
CL
16.79
17.06
16.94
16.97
16.63
16.5015.90
16.30
16.63
16.66
16.25
16.21
16.40
16.37
16.70
16.78
16.85
16.80
16.63
17.02
17.05
17.34
17.22
17.01
17.16
17.21
17.42
17.53
17.71
17.64
17.42
17.66
17.69
17.73
17.99
17.94
17.87
17.51
17.74
18.03
18.09
17.92
18.32
18.25
18.13
18.45
18.41
18.40
18.22
18.39
18.46
18.25
18.53
18.53
18.66
18.82
18.65
18.54
18.84
18.74
19.17
19.35
21.29
21.24
21.34
21.36
21.56
21.48
21.46
21.45
21.34
15.84
15.78
15.71
15.65
15.40
15.12
14.93
14.52
14.20
14.03
13.86
15.30
15.16
15.09
14.86
14.59
14.34
15.08
15.03
14.66
14.55
14.11
15.23
15.09
14.97
14.50
15.23
15.09
14.78
14.67
13.47
13.91
14.01
14.04
14.32
14.41
14.63
15.19
15.51
15.50
15.63
15.90
15.87
16.28
16.62
16.76
16.93
17.33
17.43
18.00
17.89
17.61
17.43
17.33
17.66
17.51
16.94
16.72
15.98
15.77
15.75
15.15
15.40
15.45
15.50
15.28
14.94
14.93
15.13
14.82
14.71
14.81
14.66
14.49
14.21
14.15
14.23
13.23
13.52
13.50
13.66
13.98
14.21
14.61
13.70
13.67
13.85
14.07
14.41
14.50
14.92
15.16
16.20
16.44
16.88
16.94
17.11
17.68
17.53
17.49
17.48
17.28
17.24
16.71 16.77
16.48
16.23
18.43
18.23
15.77
15.75
16.63
16.88
16.98
17.06
15.26
15.25
15.17
15.28
14.9715.31
15.25
15.30
15.39
15.87 15.91
16.15
16.23
16.01
15.99
15.57
16.11
15.46
16.39
16.76
16.03
15.98
16.03
16.15
16.12
14.99
15.18
15.74
16.43
16.59
18.25
18.23
18.16
17.93
18.12
18.15
18.55
18.56
18.48
18.48
18.52
17.99
17.95
17.7117.74
21.01
19.95
19.10
19.16
18.34
17.80
17.05
16.55
15.93
15.73
15.01
15.35
15.17
14.97
14.78
18.36
17.86
17.25
16.87
17.00
16.70
16.69
16.52
16.04
18.39 18.43
17.80
17.28
16.80
16.83
16.71
16.66
16.51
16.14
15.93
15.72
15.74
18.13
17.58
16.84
16.52
16.51
16.34
16.35
16.36
16.41
16.18
15.88
15.70
15.61
15.60
15.65
15.63
18.58
18.28
18.00
16.87
16.41
18.84
19.15
18.90
16.44
18.91
18.49
18.26
18.05
18.19
17.41
16.96
17.31
17.08
16.87
16.82
16.23
16.18
16.05
15.91
15.47
14.98
16.15
15.87
15.43
15.16
15.06
14.27
13.99
16.16
15.64
15.33
15.00
14.76
14.68
14.27
14.10
15.11
14.62
14.94
15.17
13.93
IL
13.84
13.94
13.91
14.16
15.0514.28
16.31
16.22
16.1016.14
16.17
16.11
16.03
16.15
16.26
16.18
16.04
16.37
16.18
16.02
16.19
16.57
16.78
17.85
18.25
18.61
18.55
18.86
18.86
19.18
19.15
19.27
19.29
19.76
19.32
19.31
18.75
18.42 18.30
17.86
17.97
16.44
16.38
16.29
16.59
15.93
17.58
18.87
14.91
16.05 16.05
18.26
18.27
18.66
18.60
16.26
16.24
15.86
16.09
16.00
16.05
16.30
16.28
16.63
16.59
16.74
16.80
16.37
16.48
16.22
15.72
15.54
15.50
15.34
15.42
15.41
15.18
15.08
15.07
15.26
15.42
15.51
15.17
17.23
17.60
18.01
18.25
18.19
17.33
17.46
16.40
16.73
16.89
16.42
16.88
17.94
19.66
20.69
19.80
18.67
17.74
16.95
16.15
15.74
15.32
15.13
15.35
15.13
15.06
15.00
15.34
15.33
15.74
16.20
16.86
17.47
18.76
18.87
16.75
16.22
15.77
15.49
15.32
14.98
15.01
14.80
14.69
14.91
14.88
15.05
15.42
15.73
16.01
15.48
15.14
14.92
14.74
14.68
14.41
14.54
14.89
15.08
15.19
14.74
14.49
14.37
14.29
13.98
14.35
14.37
14.86
14.90
14.88
14.58
14.60
14.12
14.09
14.01
16.89
17.40
18.19
19.60
21.29
21.96
20.53
18.66
17.52
16.90
16.90
17.54
19.00
20.37
21.14
19.30
17.84
17.25
17.79
18.51
20.56
22.08
22.36
20.51
18.95
18.53
19.79
19.94
21.45
22.82
22.45
20.59
22.12
20.24
18.58
17.78
14.79
14.57
14.94
17.76
18.35
19.21
20.77
21.33
21.48
19.91
18.49
17.52
17.76
17.79
18.58
20.32
19.55
18.56
17.89
17.74
18.57
18.32
18.33
18.43
19.74
19.21
18.55
18.99
19.21
19.15
20.04
19.35
18.80
18.30
17.63
17.85
18.11
18.25
18.87
19.86
20.51
20.45
19.38
18.49
18.20
18.10
18.03
17.77
17.15
17.83
18.05
19.07
20.35
21.17
20.47
19.24
18.40
18.16
17.87
17.31
17.30
20.42
20.57
19.72
19.57
19.49
18.48
18.50
18.69
18.35
18.16
17.78
17.61
17.91
17.49
17.46
17.31
16.86
16.92
17.42
16.03
16.99
16.90
16.47
16.59
16.59
16.57
16.57
16.58
16.31
15.19
15.03
14.89
20.22
19.18
18.85
18.38
21.45 21.26
20.98
19.50
18.00
15.65
15.72
15.24
14.94
14.76
14.50
14.20
14.07
13.90
16.35
16.28
16.26
16.13
16.06
16.54
16.89
16.95
17.39
17.17
17.17
17.55
18.64
18.76
17.67
18.47
18.36
18.39
18.60
18.10
17.59
16.98
17.55
18.03
18.18
19.00
18.66
18.96
19.34
19.39
19.01
19.26
19.64
19.82
IL
15.21
IL
15.58
25.45
25.41
24.19
24.28
24.16
24.08
24.05 24.04
24.06
24.09
24.11
24.09
23.56
23.36
23.01
23.03
23.22
23.25
23.28
23.26
23.60
23.63
23.59
23.29
23.08
22.94
22.87
22.82
23.61
23.62
23.50
23.51
23.5523.70
23.61
23.66
23.78
23.84
23.67
23.72
30.21
30.25
30.07
29.72
29.43 29.53
29.94
30.37
30.15
30.05
31.53
32.10
33.65
33.02
32.92
24.86
24.58
24.14
24.19
24.22 24.24
24.06
23.88
22.59
22.74
22.87
23.19 22.92
22.81
23.18
23.21
23.35
23.54
24.06 23.70
23.58
23.47 23.35
23.6524.17
24.31
24.27
24.06
24.71
24.55
24.59
24.45
24.29 23.81
23.76
23.88
24.42
24.71
24.83
24.86
24.86
24.98 24.91
25.03 24.83 24.97
24.51
23.91
23.47
23.19
23.19
24.09
24.51
25.05
25.23
25.3325.16
25.07
25.05
25.30 25.12 25.07
24.96 24.59
24.27
23.86 23.59 23.18
23.06
23.24
23.5523.65
23.81
23.78
24.35
23.98
24.62
24.73
25.19
24.95
25.30
25.30
25.40
29.11
29.42
29.46
13.61
13.62
12.48
12.51
13.39
13.19
12.55
12.41
14.03
13.42
13.54
13.67
13.69
13.95
13.37
13.66
13.60
13.62
13.71
13.68
13.79
12.46
12.19
13.60
13.55
13.19
13.41
13.46
13.53
13.72
13.57
13.57
13.46
13.38
13.22
13.61
13.65
13.71
13.02
13.01
13.11
12.95
13.00
13.05
13.82
14.02
14.36
14.06
12.89
12.75
12.72
12.85
12.96
13.18
13.28
13.32
13.50
13.36
13.70
13.38
13.33
13.28 13.25
12.88
13.16
13.36
13.44
13.48
13.72
12.68
12.67
12.76
12.69
12.7112.67
12.78
13.51
13.2612.74 12.72 12.94
12.98
13.31
13.50
13.61
13.51
13.77
12.55
13.82
13.64
13.55
13.82
13.89
14.00
14.14
14.21
14.23
14.39
14.31
14.36
14.36
14.62
14.69
14.64
14.59
13.82
13.61
13.74
13.85
14.02
14.15
14.23
14.22
14.30
14.33
14.32
14.35
14.62
14.68
14.58
14.51
14.72
14.20
14.32
14.30
14.13
14.11
14.05
14.03
13.92
13.61
14.69
14.67
13.69
12.98
12.45
13.53
13.43
13.44
13.29
13.50
13.45
13.74
13.81
13.60
13.47
14.06
13.77
13.94
14.16
14.33
14.15
14.24
14.27
14.22
14.18
14.09
14.34
14.56
14.51
CL
13.27
13.32
13.64
14.65
12.71
12.68
24.10
24.52
24.52
24.48
24.54
24.45
24.43
24.63
24.81
24.92
24.99
25.09
25.33
24.54
39.12
39.43
39.10
38.43
37.84
36.84
35.47
34.44
31.85
32.57
33.54
34.44
35.73
36.67
36.38
37.05
30.26
29.61
28.98
29.05
29.88
29.98
29.99
30.30
30.52
30.43
30.71
31.12
29.11
28.27
28.84
27.98
27.81
27.68
39.57
38.39
38.22
37.14
37.10
35.69
34.08
33.88
35.12
34.04
32.66
24.95
25.33
24.98
24.91
24.80
24.64
24.54
24.53
24.44
24.86
24.87
24.91
24.64
24.36
24.38
24.43 24.43
24.46
24.73
25.57
25.33
25.06
24.94
24.85 24.82
24.50
24.62
24.67
24.68
24.97
24.64
24.50
13.52
13.26
13.24
14.54
14.38
14.27
14.15
14.03
13.89
13.68
13.72
13.50
13.22
13.72
13.77
25.44
25.17
24.72
24.43
24.18
23.92
24.13
24.11
24.34
24.53
24.86
25.46
26.02
26.51
27.13
27.69
28.59
28.99
29.96
30.88
30.76
30.31
29.44
29.32
29.40
29.57
15.48
14.71
14.69
14.75
15.08
15.13
15.02
15.72
16.27
16.40
16.44
14.59
14.25
14.22
14.57
14.39
14.04
14.00
14.37
14.16
14.18
14.09
14.31
14.20
13.95
13.89
13.40
13.32
13.36
13.72
13.69
13.85
13.77
13.51
13.32
13.48
13.67
13.76
13.72
15.17
15.30
14.95
14.76
14.37
14.44
14.37
14.32
14.25
14.08
13.88
13.84
15.49
15.72
16.14
16.63
16.91
17.43
18.30
19.54
20.60
21.65
22.31
22.73
23.08
23.69
23.91
24.06
24.15
24.17
24.08
23.94
23.58
23.38
23.32
23.32
22.84
22.65
22.34
21.55
21.08
20.57
20.74
20.43
19.35
18.91
18.91
18.92
19.16
19.43
19.69
20.05
20.22
20.33
20.58
20.95
21.09
20.98
21.10
21.14
21.15
21.65
21.62
21.82
21.44
21.50
21.31
21.38
21.44
21.35
21.38
21.54
21.50
22.35
22.29
22.54
22.84
23.03
23.22
23.55
24.09
24.46
24.76
24.84
24.89
25.12
25.22
25.32
25.24
25.40
25.51
25.45
22.12 22.01
22.48
22.65
22.71
22.81
22.87
22.92
22.84
22.90
22.79
22.77
22.97
23.03
24.11
24.20
25.37
25.34
Gate
Gate
IL
13.05Culvert
Culvert
Duct
Duct
IC
Duct
Duct
Gu
Gu
Duct
CL
16.68
IC
BTIC
IC
CL
16.72
IC
Culvert
Culvert
Culvert
Culvert
IC
12.77
12.90
13.29
13.07
13.27
13.72
25.19
25.27
25.09
25.06
25.02
24.87
24.79
24.75
24.70
24.63
24.51
24.57
24.61
24.63 24.66
24.68
24.76
24.85
24.97
25.13
25.20
25.29
25.32
25.39
25.39
25.46
25.46
25.50
24.71
24.75
24.78 24.79
24.84 24.89
24.93
25.06
25.16
25.28
25.47
25.38
25.39
25.50
25.43
25.37
25.34
25.25
25.42
25.37
25.37
25.22
24.69
24.57
24.52
25.63
25.36
25.53
25.49
25.41
25.39
25.36
25.33
25.25
25.21
25.18
25.20
25.39
25.68
25.64
25.58
25.55 25.52
25.5225.53
25.59
25.53
25.47
25.36
25.43
25.42
25.39
25.38
25.31
25.25
25.23
25.00
24.98
24.9924.96
24.89
24.91
24.90
24.90
24.90
24.9124.91
24.90
24.87
24.81
24.69
25.40
25.42
25.58
25.58
25.61
25.62
25.61
25.13
24.61
24.66
24.69
24.93
24.97
25.24
25.29
25.31
25.28
25.42
25.47
25.46
25.56
25.50
25.43
25.16
25.26
25.30
25.32
25.26
25.41
25.31
CL
25.08
IC
CL
25.34
25.27
25.09
24.77
24.78
25.29
25.30
25.37
25.26
25.34
25.73
25.56
25.50
Gate
CL
24.77
Gu
Gu
Gu
Gu
Gu
Gate
Gate
Gate
IC
IC
Gate
BTIC
T2 T3 T4
T5
T6
T8
T10
T11T13
T18
T1
G2
T2 T3 T4
T5
T6
T7003
T7005
T7006
T7007
T7008
T7010
T16
Dead Elm
T1
T2
T7009
T31
T7
T12
T31
T17
T9
T14
T15
T27
T28
T29
T30
T3
T7004
G3
G3
G3
G3
G3
G1
Boundary Key
Proposed Application Boundary
Approved Masterplan Boundary
PHASE 1
FUTURE PHASE; REFER TO
APPROVED MASTERPLAN
R3
R7
R2
Mayne Farm
Road
MAYNE
ROAD
EDGAR ROAD
FAIRFIELD AVE
WARDS ROAD
HIGH SCHOOL DRIVE
CLIENT
WWW.COLLECTIVEARCHITECTURE.CO.UK
TELEPHONE +44(0)141 552 3001
TOP FLOOR, 2 COMMERCIAL STREET, EDINBURGH, EH6 6JA
TELEPHONE +44 (0)131 516 2270
EMAIL INFO@COLLECTIVEARCHITECTURE.CO.UK
PROJECT
DRAWING
PRO NO.
DATE BY SCALE CHKD
LEVEL REV
NOTES -
REV REVISION NOTE DATE BY
4th FLOOR, 13 BATH STREET,  GLASGOW, G2 1HY
DO NOT SCALE FROM DRAWING.
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO THE START
OF ANY WORK AND ANY DISCREPANCIES NOTIFIED IN WRITING.
REFER TO ENGINEERS' DRAWINGS FOR ALL STRUCTURAL, HEATING, LIGHTING,
POWER, EXTERNAL AND UNDERGROUND DRAINAGE AND VENTILATION INFORMATION.
ALL BUILDING WORKS TO COMPLY IN ALL RESPECTS TO CURRENT
BUILDING STANDARDS FOR COUNTRY IN WHICH SITE IS LOCATED.
COLLECTIVE ARCHITECTURE LTD HAVE REVIEWED APPLICABLE PRODUCTS
AVAILABLE IN THE UK AT THE TIME OF WRITING THE SPECIFICATION, FROM WHICH
THE PRODUCTS NAMED IN THE SPECIFICATION AND IDENTIFIED ON DRAWINGS HAVE
BEEN SELECTED.  WHERE THE CONTRACTOR WISHES TO PROPOSE ALTERNATIVE
PRODUCTS, REPRESENTATIVE SAMPLES AND A FULL TECHNICAL APPRAISAL IS TO
BE SUBMITTED BY THE CONTRACTOR TO THE EMPLOYER DEMONSTRATING THAT
THEIR PROPOSAL HAS EQUAL OR HIGHER PERFORMANCE. ANY ALTERNATIVE
PRODUCTS ARE SUBJECT TO DESIGN TEAM, BUILDING CONTROL, WARRANTY
PROVIDER AND EMPLOYER ACCEPTANCE.
ORIG
- CAL
VOL TYPE
A
ROLE NUM
4.3, THE FLOUR MILL, 34 COMMERCIAL STREET, DUNDEE, DD1 3EJ
TELEPHONE +44(0)141 552 3001
Y:\B. Live Project File\20344 Bilbohall Revised Project\2. Drawings\a. W
IP\01-BIM\01-Central\20344-CA-01-ZZ-M3-A-00-001 - Site Model Phase 1.rvt
As indicated @ A1
P01
INFORMATION
JMSYS12/18/23
20344 - 05-001
Existing Location Plan
Bilbohall, Phase 1
Moray Council
- XX- XX - DR -
P01 Issued for PoAN 30.01.24 sys
1 : 1250
Existing - Location Plan
Item 9.
Page 189

Page 190

Page 190

Page 191

REPORT TO: PLANNING AND REGULATORY SERVICES COMMITTEE ON 
12 MARCH 2024 
SUBJECT: MORAY LOCAL DEVELOPMENT PLAN 2020 - MONITORING
REPORT 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report asks the Committee to consider and approve the Moray Local
Development Plan Monitoring Report 2023. 
1.2 This report is submitted to Committee in terms of Section III (E) (2) of the
Council's Scheme of Administration relating to the review and preparation of
Local Development Plans. 
2. RECOMMENDATION 
2.1      It is recommended that the Committee; 
(i) considers and approves the Monitoring Report as set out in
Appendix 1 and Appendix 2; and 
(ii) notes that the Monitoring Report will be used to inform the
Evidence Report for the Local Development Plan (LDP) 27. 
3. BACKGROUND 
3.1  The Moray Local Development Plan (MLDP) 2020 was adopted on 27 July
2020. The LDP2020 was informed by 9 main land use issues identified as part
of the Main Issues Report (MIR) in 2018. The Monitoring Report examines
whether the policies and designations of the MLDP 2020 are addressing these
issues. A Monitoring Report covering the period July 2020 to July 2021 was
presented to this Committee on 16 November 2021 (para 14 of the minute
refers). This Monitoring Report covers the following two years from July 2021
to July 2023. 
3.2 The new planning system as set out in the Planning (Scotland) Act 2019
requires Planning Authorities to submit an Evidence Report to assess the
sufficiency of the evidence base through the Gatecheck process when
preparing new LDP’s. Having an up to date Monitoring Report forms part of
Item 10.
Page 191

Page 192

the Evidence Report which will be presented to a meeting of the full Council
on 24 April 2024. 
4. MONITORING REPORT 
4.1  The Monitoring Report in Appendix 1 reviews the progress made on
addressing the issues identified in the MIR 2018. National Planning
Framework 4 (NPF4) was approved in February 2023 and now forms part of
LDP’s.  This report covers the time period between July 2021 and July 2023.
As NPF4 has not been in operation for that long, it is not possible for a
detailed analysis of its impact to be covered in this report.  Future Monitoring
Reports will require to examine and the impact of NPF4 policies as well as
new policy requirements such as Community Wealth Building. 
4.2 The report has been structured like the previous 2021 Monitoring Report and
focuses on the 9 “main issues” identified in the MIR.  It also contains a table
setting out progress on designated housing, employment and opportunity sites
in Appendix 2. The report also provides an overview of decisions from Moray
Local Review Body (MLRB) and the Scottish Government’s Planning and
Environmental Appeals Division (DPEA). A summary of some of the key
indicators considered in the monitoring report is set out below. 
4.3 Growth Strategy: A review of planning consents and completions shows that
these have largely been in line with the Growth Strategy for Moray. However,
approvals and completions have been more modest in the Tertiary Growth
Areas of Lossiemouth, Keith, Fochabers, Mosstodloch and Aberlour.
Recovery from the impacts of the Covid-19 pandemic is evidenced in the
increased completions across 2021/22 and 2022/23. 
4.4 Providing a generous supply of housing land: All population projections
need to be treated with caution however several trends can be drawn. 
Although the projected population of Moray is projected to decline (-3% from
2018 to 2043), data from National Records of Scotland (NRS) shows that the
number of households living in Moray is projected to increase by 5% between
2022 and 2042.  This trend is expected to continue which will be fuelled by the
demand for smaller households.   Similarly, the trend for an ageing population
and smaller household sizes continues to be forecast and is an issue that is
going to have to be addressed in future years, particularly with the lack of
choice in the private market (ie a small supply of bungalows). 
4.5 The Housing Land Audit (HLA) previously reported to this Committee on 15
August 23 (para 10 of the minute refers) demonstrated that Moray has a 12
year effective land supply with a further 9 years from the LONG supply which
can be drawn from if the relevant triggers are met. This approach to LONG
term housing land has been recognised as good practice and allows for longer
term infrastructure planning through strategic level masterplanned expansion
areas. 
4.6 Creating Quality, integrated healthy places: PP1 Placemaking has been
operational for over 3 years since the adoption of the MLDP.  In conjunction
with the Quality Audit (QA) process, this has seen improvements in the quality
of information being provided in planning applications resulting in better
decisions on the ground.  The QA continues to play an important role in
Page 192

Page 193

ensuring that all key elements of the policy are delivered including making
significant improvements on areas such as improving character and identity,
multi-functional open space provision, car parking, landscaping, embedding
green and blue infrastructure to support biodiversity and climate change, and
improving mental health and well being. The QA process was recently revised
to take cognisance of National Planning Framework 4 (NPF4) which was
approved at a meeting of this Committee on 15 August 2023 (para 13 of the
minute refers).  Additional Planning Guidance on MLDP Policies has also
been prepared helped to provide clarity on specific policy areas with is
intended to help developers understand what is required to comply with policy. 
4.7 Providing a generous employment land supply:  The Employment Land
Audit was reported to Committee on 15 August 2023 (para 9 of the minute
refers) and demonstrated that overall there is 99.87ha of effective
employment land. However, a shortage of industrial land in Forres and
Speyside has been identified as highlighted in previous Monitoring Reports.
Similarly, I7 Barmuckity/Elgin Business Park, is progressing well and work is
needed to bring new sites forward to ensure a continued supply of land. No
applications have been received for new industrial estates. Pressure for
leisure and retail uses on existing industrial estates is anticipated to continue
and will require to be monitored to assess the effectiveness of Policy DP5
Business and Industry and DP7 Retail/Town Centres.  There are emerging
trends for development proposals such as battery storage facilities which will
need to be monitored.  This will likely have implications for the employment
land supply and the next LDP if applications for this type are approved on
designated employment land sites given that they are land hungry, offer very
little permanent employment opportunities, and do not fall within the use
classes normally associated with industrial estates. 
4.8 Taking an infrastructure first approach: Developer Obligations are being
collected toward infrastructure including healthcare, education, transportation
and a 3G pitch in Forres in line with Policy PP3 Infrastructure and Services
and the Developer Obligations Supplementary Guidance. Site specific
infrastructure requirements, methodology and rates to seek developer
obligations towards the identified infrastructure requirements are set out in the
statutory Developer Obligations Supplementary Guidance (SG). This SG is
currently under review and is anticipated to be reported to this Committee in
the middle of this year. 
4.9 Moray Council facilitate a LDP Delivery Group which includes a wide range of
representatives from NHS Grampian, Scottish Water, Scottish Gas Networks
(SGN), SSEN, Transport Scotland, and Council Services for Education,
Transportation, Sports and Recreation, and Housing.  This Group informed
the LDP2020 infrastructure requirements as well as subsequent reviews of the
SG, and similarly the Group will inform the evidence base for the LDP27 and
Delivery Programme.   
4.10 Pressures on Moray’s landscape and rural cultural heritage: There have
been limited departures from policy EP3 Special Landscape Areas and
Landscape Character and policy EP5 Open Space. Impacts on the landscape
from large-scale onshore wind developments and other types of energy
developments will remain a pressure. The Keith Green Energy and
Infrastructure Framework was prepared in response to the pressures of
Page 193

Page 194

development associated with the grid around the wider Keith area.  MLDP
Policy EP5 has been largely effective in restricting new housing within ENVs.
The loss of open space to accommodate development remains low.   
4.11 Safeguarding and promoting biodiversity: Biodiversity enhancement is
now being delivered through new development since the adoption of both the
MLDP 2020 and NPF4 which places a strong emphasis on the nature crisis
and climate emergency.   Since the adoption of the policy, applications must
provide a biodiversity plan to demonstrate how their proposals safeguard and
enhancing biodiversity.  This has seen notable improvements in terms of the
variety of planting and species that is being provided, incorporation of blue
and green infrastructure, and measures such as bat boxes, swift bricks and
hedgehog highways which are all standard features.  NPF4 places significant
importance on tackling the nature crisis.  Going forward it is essential that
biodiversity plans do not become generic and are site specific to deliver
maximum benefits.  A biodiversity strategy, identification of nature networks,
and further training on biodiversity issues will also be undertaken. 
4.12 Delivering on Climate Change: Planning for Climate Change and supporting
the reduction of greenhouse gas emissions is embedded within several
policies. PP1 Placemaking and DP1 Development Principles include criteria
such as integrating multi-functional active travel routes, green and open
space; maximising environmental benefits through orientation of buildings to
maximise as solar gain and wind shelter; supporting and enhancing
biodiversity; designing open space to be multi-functional including green/blue
networks; EV charging; cycle parking provision; avoiding areas at flood risk;
dealing with surface water in a sustainable manner to have a neutral impact
on flooding; and avoiding workable reserves of prime agricultural land or
productive forestry. 
4.13 NPF4 now places significant weight on addressing the climate emergency and
all proposals must demonstrate how they address climate change.  To assist
applicants planning guidance was prepared to support the implementation of
NPF4 which requires new developments to be sited and designed and
applicants to calculate the lifecycle carbon from proposals to minimise
greenhouse gas emissions as far as possible and adapt to current and future
risks from climate change. 
4.14 Rural Housing: The hierarchical policy approach introduced in the MLDP
2020 has been successful in protecting pressurised areas from further
inappropriate development.  All applications within Pressurised and Sensitive
Areas have been refused and this position has been subsequently supported
by the MLRB where reviews were requested. Siting and design policy
requirements are also driving better located houses within the landscape and
design standards have also improved with more traditional simple forms of
homes being delivered on the ground.  To support and monitor the delivery of
NPF4 a suite of indicators are being considered by Officers. 
Page 194

Page 195

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The MLDP delivers Corporate and Community Planning objectives and
annual monitoring allows assessment of the implementation and
effectiveness of policies and proposals. 
(b) Policy and Legal
Preparation of the LDP is a statutory responsibility for the Council. 
(c) Financial implications
None. 
(d) Risk Implications
Failing the Gatecheck process due to the lack of monitoring mechanisms
would result in delays of having an up to date LDP as well as local policy
positions and projects. There could also be a failure to provide an
effective housing and employment land supply.   
(e) Staffing Implications
Preparation of the Monitoring Report is part of the workload of the
Strategic Planning & Development section. 
(f) Property
None 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising from this report as it is to inform
the Committee on monitoring of the LDP only. 
(h) Climate Change and Biodiversity Impacts
The Monitoring Report plays a key role ensuring that MLDP 2020 and
requirements relating to Climate Change and Biodiversity are being
adhered to and delivered.  NPF4 introduced new policy requirements for
the planning system on climate change and biodiversity and these will be
included within future Monitoring Reports. 
(i) Consultations
Consultation has taken place with the Depute Chief Executive
(Economy, Environment and Finance), the Head of Economic Growth
and Development, the Legal Services Manager, the Senior Engineer
(Transportation), the Housing Strategy and Development Manager, the
Development Management and Building Standards Manager, the Equal
Opportunities Officer, and the Democratic Services Manager have been
consulted and comments received have been incorporated into the
report. 
Page 195

Page 196

6. CONCLUSION 
6.1 The MLDP Monitoring Report provides an evidence base which can be
used to influence future policy documents and the preparation of the
next MLDP. The Monitoring Report can help identify where additional
guidance and/or training is required on the implementation of policies. 
Having an up to date Monitoring Report will also form part of the
Evidence Report for the preparation of the next MLDP. 
6.2 The report highlights that development proposals are generally
reflective of the Growth Strategy. There continues to be a good supply
of effective housing land. Whilst overall there is a good supply of
effective employment land, shortages of industrial land are identified in
Forres and Speyside, as well as good uptake being made at I7
Barmuckity. PP1 Placemaking and the Quality Audit process is
continuing to deliver improvements in urban design and the quality of
information being submitted in planning applications. The Rural
Housing policy has been successful in preventing further cumulative
build up in sensitive areas. Policies continue to work to safeguard the
environment and landscape. 
Author of Report:  Keith Henderson
Planning Officer, Strategic Planning and Development 
Background Papers: 
Ref:
Page 196

Page 197

APPENDIX 1
Moray Local Development Plan 2023 Monitoring Report – 27th July 2021 to 26th July 2023
The Monitoring Report is intended to examine the performance of the Moray Local Development Plan (MLDP) 2020 and provide an update on land use
planning issues.  The Main Issues Report 2018 set out what was considered to be the main land use issues facing Moray and set out options on how these
could be addressed within the MLDP.  It will also provide an update on planning appeals by both the Moray Local Review Body and the DPEA.  The previous
Monitoring Report (2021) was structured around these issues.  
This report will cover two years as opposed to the previous Monitoring Reports which only covered one.  However, to provide a comparison over the plan
period the 2023 report will be structured in the same way and where possible information will be broken down between the two years.
The nine main issues are
1. The proposed Growth Strategy
2. Providing a generous and effective supply of land for housing
3. Creating integrated, quality healthy places
4. Providing a generous employment land supply
5. Taking an infrastructure first approach
6. Pressures on Moray’s landscapes and rural cultural heritage
7. Safeguarding and promoting biodiversity
8. Delivering on Climate Change
9. Rural Housing
10. Planning appeals 
Item 10.
Page 197

Page 198

APPENDIX 1
1. Demographics & Growth/Spatial Strategy 
Please note the following statistics cover the period from July 2021 – July 2023 as well as identifying other longer term demographic trends. 
1.1  Demographics 
General
• Between 2001 and 2021 Moray’s population grew by 11% compared with 8% growth across Scotland.
• The population was 96,410 on 30th June 2021.  This is an increase of 0.6% from 2019.
• However, population growth is projected to reverse between 2018 and 2043 with a decline in population of just under -3%. 
Ageing Population
• Since 2001, there has been a 52% increase in those aged 65+ and an 86% increase in the 85+ age group. Over the same period the 25 – 44 age group
shows the largest decrease of -13%.
• This projected trend is expected to continue between 2022 and 2042 with a 32% increase in those aged over 65.  Over this same period negative
growth is expected for those of a working age with a -12% decline across Moray which is an issue that will need to be addressed.
• Data for the period between 2018 and 2028 for the age groups of 65 to 74, and 75 and over show projections of 13.9% and 32.4% increases.  In
comparison, the 0 to 15, 16-24, and 45 to 64 age groups show percentage decreases of 14.1%, 5.3%, and 7.6% respectively.
• These projections have been reflected in previous Monitoring Reports and statistics and highlight the trend that Moray is going to have to address
an ageing population with a declining working age population which will have an impact on the economy, housing, and health care provision. 
Households
• Although the projected population of Moray is projected to decline (-3% from 2018 to 2043), data from NRS shows that the number of households
living in Moray is projected to increase by 5% between 2022 and 2042.  This is lower than previous projections where in 2018 an 8.2% increase was
projected.  This trend is expected to continue which will be fuelled by the demand for smaller households.
• In 2022 there were an estimated 43,995 households in Moray.  This is a 0.9% increase from 2021 and a 2.47% increase from 2019.  In comparison
the number of households in Scotland increased by 0.8% from 2021.
• The number of 75+ year old head of households in Moray is projected to grow by 84% by 2043 whilst every other age range will decrease. Single
Person and 2 Adult households will be subject to the greatest growth levels in Moray with 17% and 11% projected between 2018-38 respectively. 
This trend reflects the 2021 Monitoring Report which showed that the “two or more adult, one or more children” household is projected to see the
largest percentage decrease (5.4%) and the “one adult” household is projected to see the largest increase over a 2018 – 2028 period.
Page 198

Page 199

APPENDIX 1
• Based on these trends it is clear that housing delivery plans will need to be aligned to accommodate an ageing and smaller household profile.
• The accuracy of projections is variable and they therefore should be treated with caution.  Whilst over time the projections have differed in terms of
the levels of change projected, the overall trend of an increasing ageing population and declining working age population has not changed from
previous Monitoring Reports. 
1.2 Growth & Spatial Strategy 
The MLDP 2020 introduced a revised Growth/Spatial Strategy for Moray which better reflects population size, access to services and jobs and development
pressure for housing and employment. Elgin continues to be identified as the primary growth area, with Buckie and Forres identified as secondary growth
areas. Aberlour, Fochabers, Keith, Lossiemouth and Mosstodloch are identified as tertiary growth areas. 
Approvals and Completions 
Table 1: Completions 
Spatial Strategy No. of Approvals (2021-22) No. of Completions
(2021)
No. of Approvals (2022-23) No. of Completions (2022)
Primary Growth Area 367 121 334 146
Secondary Growth Area 163 115 81 156
Tertiary Growth Area 5 108 11 61
Smaller Towns & Villages 93 14 3 15
Rural Groupings 5 40 11 40 
Table 2: Approvals and completions by Spatial Strategy 
Local Housing Market Area No. of Approvals (2021-22) No. of Completions
(2021)*
No. of Approvals (2022-23) No. of Completions (2022)*
Buckie 118 74 66 37
Elgin 457 226 352 176
Forres 52 55 21 134 
2018 2019 2020 2021 2022
Moray 358 414 231 398 418
Page 199

Page 200

APPENDIX 1
Keith 0 3 0 31
Speyside 6 0 0 0 
Table 3: Approvals and completions by Spatial Strategy
*Does not include Rural Groupings 
2021/22
• A total of 633 units received approval in the towns, villages and rural groupings between 2021 and 2022, compared to 470 units in 2020/21. The
increase is primarily due to consents relating to the next phases of masterplanned areas at Findrassie and Elgin South.
• The focus of approvals was in the Primary (58%) and Secondary (26%) Growth Areas, reflecting the hierarchy of the Growth/Spatial Strategy.
• Approvals in Tertiary Growth Areas continues to be low, with five units consented in 2021/22, and do not reflect its position in the Growth/Spatial
Strategy.
• 93 units received consent in Smaller Towns/Villages, compared to 14 in 2020/21. This was due to developments in Lhanbryde (32 units) and
Hopeman (48 units).
• Completions in 2021/22 were up from 2020-21, reflecting the recovery from the impacts of the Covid-19 pandemic, with 398 units. The locations of
completions reflect the hierarchy of the Growth/Spatial Strategy. 
2022/23
• Between 2022 and 2023, a total of 440 units received planning consent.
• 80% of approvals were in the Primary Growth Area, with 19.7% in the Secondary Growth Areas.
• 11 units were consented in Tertiary Growth Areas and 3 units approved in Smaller Towns/Villages, reflective of the Growth/Spatial Strategy.
• Completions continue to show a positive return to pre-Covid figures with 418 units completed in 2022/23. 
1.3  Conclusion 
• Approvals and completions are largely in line with the Growth\Spatial Strategy although growth in the Tertiary Growth Areas continues to be
modest.
• Recovery from the impacts of the Covid-19 pandemic is evidenced in the increased completions across 2021/22 and 2022/23.
• Moray is going to have to continue to address issues with an ageing population and a declining working age population which will have an impact on
the economy, housing, and health care provision. 
Page 200

Page 201

APPENDIX 1
2. Providing a Generous and Effective Supply of Land for Housing 
2.1 Effective Housing Land Supply 
2019 2020 2021 2022 2023
Moray 4,189 5,811 5,508 5,365 5,022 
Table 4: Effective housing land supply (Housing Land Audit (HLA) 2023 [base date January 2023]) 
• The Moray HLA 2023 identifies an effective housing land supply of 5,022 units, which is 12 years supply. 
• There remains a surplus of effective housing land in all Local Housing Market Areas (LHMA) with the exception of Keith LHMA where there is a
deficit. To address this, the release of Keith LONG1 Nursery Fields was approved.
• There is a further 3,875 units (9 years supply) which are designated as LONG and can be unlocked if specific triggers for their release are met.
• This means that a generous supply of land is available, with land identified for approximately 28 years.
• The majority of completions between 2012 and 2022 were in Elgin, Forres and Buckie. The projected house completions reflect the low supply of
new housing in Keith and Speyside. However, work at Banff Road (Keith R4) is progressing and discussions are ongoing regarding Speyview (Aberlour
R2). In addition, a masterplan is being developed for Hillside Farm (Dufftown R1) in partnership with Dufftown & District Community Association. 
• The Moray Growth Deal Housing Mix Delivery project will bring further investment to help unlock previously constrained housing land sites.
• The appendix provides an overview on progress on residential development sites. 
2.2 Affordable Housing 
2021/22 
Area No. of Affordable Units No. of Bedrooms No. of Units
Elgin 237 1-bed flat 62 (inc. 2 accessible)
2-bed flat 8
2-bed bungalow (detached) 41 (inc. 3 accessible)
2-bed house (semi) 4
3-bed flat 2
3-bed bungalow (detached) 5
3-bed house (terraced) 6
Page 201

Page 202

APPENDIX 1
3-bed house (semi) 49
3-bed house (detached) 4
4-bed bungalow (detached) 2 (inc. 2 accessible)
4-bed house (terraced) 7
4-bed house (semi) 16
4-bed house (detached) 5
5-bed house (semi) 1
5-bed house (detached) 3
Extra Care 22
Forres 48 1-bed flat 19 (inc. 7 accessible)
3-bed house (terraced) 26
4-bed house (terraced) 3 (inc. 3 accessible)
Lhanbryde 32 1-bed flat 8
2-bed bungalow (detached) 2
3-bed house (terraced) 6
3-bed house (semi) 6
4-bed house (semi) 2
Specialist bungalow 8
Hopeman 12 1-bed flat 4
2-bed house (semi) 2
3-bed house (semi) 4
4-bed house (semi) 2
Urquhart 2 3-bed house (semi) 2 
Table 5: Number of affordable housing units and type consented in 2021-2022 
• A total of 331 affordable houses are proposed across eight applications approved in the year to 31 July 2022. This represents 72% of the consented
units in this period, in excess of the 25% required by policy. This is a result of three applications which were 100% affordable housing developments.
• The Council completed 46 new build affordable units in the 2021/22 period, with other RSLs completing a further 101 units.
• Following review of the Housing Business Plan in 2022, the Council agreed that 50 Council houses would be built per annum. 
Page 202

Page 203

APPENDIX 1 
2022/23 
Area No. of Affordable Units No. of Bedrooms No. of Units
Elgin 65 1-bed flat 24
2-bed bungalow (semi) 2
2-bed house (semi) 14
2-bed house (detached) 1
3-bed house (terraced) 14
3-bed house (semi) 1
4-bed house (semi) 7
4-bed house (detached) 1
5-bed house (detached) 1
Buckie 44 1-bed flat 12
2-bed flat 4
2-bed house (semi) 6
2-bed house (detached) 1
3-bed house (terraced) 4
3-bed house (semi) 10
3-bed house (detached) 1
4-bed house (semi) 5
4-bed house (detached) 1 
Table 6: Number of affordable housing units and type consented in 2022-2023 
• 110 affordable housing units were consented across six applications between 2022 and 2023. This represents 25% of the consented units as
required by policy.
• One application made a commuted payment in lieu of on-site delivery of affordable housing, as agreed with the Housing Strategy and Development
Manager, due to the proposal requiring multi-tenure/multi-use provision under one communal roof structure.
• 45 units were completed/acquired by the Council in 2022/23, with RSLs completing a further 114 units. 
Page 203

Page 204

APPENDIX 1 
2.3  Accessible Housing 
Proposals of 10 or more units are required to provide 10% of the private sector units to wheelchair accessible standards. 
2021/22 
Area Type of Unit No. of Units
Elgin 2-bed bungalow 3
2-bed house (terraced) 12
4-bed bungalow 2
Hopeman 3-bed bungalow (semi) 1
3-bed bungalow 7
Urquhart 4-bed house (detached) 1 
Table 7: Number of accessible housing units and type consented in 2021-2022 
• 26 units to wheelchair accessible standard were secured from 176 consented private units between 2021 and 2022. This in excess of the 10%
requirement set out in policy.
• Due to the Reporter’s removal of the requirement for accessible housing to be single storey, there is a reduction in the number of units that are
single storey dwellings with no accommodation in the upper roof space. 50% of the accessible units are bungalows. 
2022/23 
Area Type of Unit No. of Units
Elgin 2-bed flat (GF) 21
3-bed house (semi) 8
Buckie 2-bed flat (GF) 9
3-bed bungalow (detached) 6 
Table 8: Number of accessible housing units and type from planning consents granted in 2022-2023 
Page 204

Page 205

APPENDIX 1
• Between 2022 and 2023, 44 units were secured as wheelchair accessible standard from 378 consented units. This equates to 11.6%, continuing the
trend of provision in excess of policy requirements.
• Only 14% of units are single storey dwellings with no upper roof space, with a large proportion (47%) meeting the requirement through ground floor
flats. This highlights the lack of choice in the private market (ie a small supply of bungalows) for elderly people or people with disabilities or mobility
issues.The extent of this trend will be monitored to identify if housing mixes reflect the trends of an aging population. 
2.4 Housing Mix 
2021/22 
Area No. of Bedrooms No. of Units Percentage
Aberlour 4-bed house (detached) 5 
Buckie 1-bed flat 8 (7%) 7%
2-bed flat 23 (21%) 21%
2-bed house (semi) 2 (2%) 2%
3-bed flat 2 (2%) 2%
3-bed house (terraced) 10 (9%) 9%
3-bed house (semi) 28 (26%) 26%
3-bed house (detached) 7 (7%) 7%
4-bed house (semi) 4 (4%) 4%
4-bed house (detached) 24 (22%) 22%
TOTAL 108 
Elgin 1-bed flat 62 (17%) 17%
2-bed flat 8 (2%) 2%
2-bed bungalow (detached) 41 (11%) 11%
2-bed house (terraced) 12 (3.3%) 3.3%
2-bed house (semi) 4 (1%) 1%
3-bed flat 2 (0.5%) 0.5%
3-bed bungalow (detached) 5 (1%) 1%
3-bed house (terraced) 16 (4% 4%
3-bed house (semi) 87 (24%) 24%
3-bed house (detached) 16 (4%) 4%
Page 205

Page 206

APPENDIX 1
4-bed bungalow (detached) 2 1%
4-bed house (terraced) 7 2%
4-bed house (semi) 16 4%
4-bed house (detached) 58 16%
5-bed house (semi) 1 0.01%
5-bed house (detached) 3 0.01%
Extra care 22 6% 
TOTAL 362 
Forres 1-bed flat 19 40%
3-bed house (terraced) 26 54%
4-bed house (terraced) 3 6%
TOTAL 48 
Hopeman 1-bed flat 6 15%
2-bed flat 6 15%
2-bed bungalow (semi) 3 7.5%
2-bed house (semi) 6 15%
3-bed bungalow (semi) 1 2.5%
3-bed bungalow (detached) 7 17.5%
3-bed house (semi) 4 10%
3-bed house (detached) 2 5%
4-bed bungalow (detached) 1 2.5%
4-bed house (detached) 2 5%
5-bed house (detached) 2 5%
TOTAL 40 
Lhanbryde 1-bed flat 8 25%
2-bed bungalow (detached) 2 6%
3-bed house (terraced) 6 19%
3-bed house (semi) 6 19%
4-bed house (semi) 2 6%
Specialist bungalow 8 25%
TOTAL 32 
Urquhart 3-bed house (semi) 2 20%
Page 206

Page 207

APPENDIX 1
3-bed house (detached) 3 30%
4-bed house (detached) 5 50%
TOTAL 10 
Table 9: Private and affordable housing mix from planning consents granted in 2021-2022 (excludes applications under 4 units, PPP and remix applications) 
• 3-bed houses made up the greatest proportion of consented units (38.3%, 230 units) between 2021 and 2022. This is made up of 4 flats, 1 semi-
detached bungalow, 12 detached bungalows, 58 terraced houses, 127 semi-detached houses and 28 detached houses.
• 4-bed properties make up the next greatest proportion was 21.5% (129 units).
• 1-bed flats make up 17.5% (105 units).
• 16.8% (101 units) are 2-bed properties, with 31 flats, 3 semi-detached bungalows, 49 detached bungalows, 12 terraced houses and 6 semi-detached
house.
• 5-bedroom houses make up only a very small number of consented units with 6 (1%) in total.
• The number of bungalows continues to decrease, with 11.3% (68 units) making up the housing mix. 
• The housing mix however continues to reflect the trend for smaller household sides, with 4/5-bed houses making up around 22% of the consented
mix. 
2022/23 
Area No. of Bedrooms No. of Units Percentage
Buckie 1-bed flat 4 6%
2-bed house (terraced) 4 6%
2-bed house (semi) 12 19%
2-bed house (detached) 1 2%
3-bed bungalow (detached) 6 9%
3-bed house (terraced) 13 20%
3-bed house (semi) 4 6%
3-bed house (detached) 7 6%
4-bed house (semi) 2 3%
4-bed house (detached) 12 19%
TOTAL 65 
Elgin 1-bed flat 27 8%
Page 207

Page 208

APPENDIX 1
2-bed flat 76 24%
2-bed bungalow (semi) 2 1%
2-bed house (semi) 14 4%
2-bed house (detached) 1 0.5%
3-bed flat 10 3%
3-bed house (terraced) 18 6%
3-bed house (semi) 51 16%
3-bed house (detached) 16 5%
4-bed house (semi) 7 2%
4-bed house (detached) 74 23%
5-bed house (detached) 25 8% 
TOTAL 321 
Table 10: Private and affordable housing mix from planning consents granted in 2022-2023 (excludes applications under 4 units, PPP and remix applications) 
• 3-bed properties continue to make up the greatest proportion of consented units with 33.5% (125 units) between 2022 and 2023. This is made up of
10 flats, 6 detached bungalows, 31 terraced houses, 55 semi-detached houses and 23 detached houses.
• 2-bed properties make up 26% (97 units), closely followed by 4-bed houses with 25.5% (95 units). These are predominately 2-bed flats and 4-bed
detached houses.
• There is a significant drop in the number of bungalows being consented, with 2.1% (8 units). This is a decrease compared to 2020/21 (23%) and
2021/22 (11.3%). 
• 1-bed flats have dropped by 9.2% whilst there has been an increase of 5.7% in 5-bed houses compared to 2021/22. 
2.5 Conclusion 
• There is a generous supply of effective housing land to meet targets set out in the MLDP 2020. Land has been released in Keith LHMA where a deficit
of supply was identified. The triggers for releasing LONG designations continue to ensure that an effective land supply can be maintained.
• MLDP policies continue to deliver land for affordable housing, with limited use of commuted payments, and securing wheelchair accessible standard
housing.
• The mix of housing types reflects the trend for smaller households (2/3-bedroom). Fewer bungalows in the private market are being secured which
reflects the change in policy which removed the requirement for accessible housing to be single storey. These are now being met through ground
floor flats which reflects limited choice in the private market
Page 208

Page 209

APPENDIX 1
3. Creating Integrated, Quality Healthy Places. 
3.1 Introduction 
Improving the standards of urban design is embodied throughout the MLDP with PP1 Placemaking being the first Primary Policy in the plan.  This recognises
the importance that good design has on people’s health and well-being through creating attractive places to live and work as well as encouraging inward
investment and economic growth. 
PP1 Placemaking is a more prescriptive policy than the one in the 2015 Moray Local Development Plan with less ambiguous wording to ensure that higher
standards of urban design are delivered.  As highlighted in the 2021 Monitoring Report the delivery of PP1 is supported by the Quality Audit (QA) process. 
Led by Officers from Strategic Planning & Development the QA process provides a consistent and multi-disciplinary approach to the assessment of design
quality of development proposals. 
Following the adoption of the MLDP 2020 the Quality Audit process was revised to remove the “amber” category.  This removed unnecessary ambiguity as
to whether a proposal was deemed to comply with PP1 or not and allowed Officers to successfully push for improvements in design. 
Further revisions to the QA process were undertaken 2022 which were approved by the Planning and Regulatory Services Committee.  This involved revising
the categories used to assess the proposal against PP1.  The way information was provided to applicants was also revised to streamline the process to
provide further clarity to applicants on the design issues and improvements necessary to comply with PP1 Placemaking, and other relevant policies of the
MLDP 2020.   
Given that NPF4 now forms part of the Moray ‘development plan’ the QA has been reformatted to align with the 6 qualities of a successful place and Annex
D of Policy 14 Design, quality and place.  The QA update streamlines the assessment of the design quality of development proposals against the relevant
development plan policies clearly and consistently and NPF4 via one collective process, and provides further clarity of the interpretation of the 6 qualities of
a successful place set out in NPF4 in a Moray context.  This approach not only ensures that proposals comply with the current MLDP policy but also the
aspirations of NPF4 and Policy 14 Design, quality and to create well designed and successful places. 
The policy also has the NPF4 principle of Local Living and climate resilience embedded throughout it and recognises the importance of creating well-
designed mixed-use neighbourhoods and all of the associated health benefits that come from them.   
Future monitoring reports will evaluate how well this version of the QA is at assessing proposals against both the MLDP 2020 and NPF4. 
Page 209

Page 210

APPENDIX 1 
3.2 Quality Audits 
The table below shows the number of QA’s that were undertaken over the monitoring report period.  In the two years since the 2021 Monitoring Report 7
QA’s have been completed.  Several applications are subject to ongoing QA’s the outcome of which will be reported in the next monitoring report. 
Settlement Site name and designation Application
number
Approved/refused PP1 Departures and NPF4 (if applicable) & Justification
Elgin R11 – Findrassie  21/00961/AMC Approved Parking (iv) -acceptable departure given the limited extent of the remix,
mitigation to parking provided. 
R13 – Lesmurdie Fields 19/01510/APP Approved Character & Identity (i) & Biodiversity (v) – Proposal was departure from
Policy EP7 part c) Control of Woodland Removal as woodland was removed
for the SUDS.  Compensatory planting was provided. 
R14 – Spynie Hospital 20/00781/APP Approved (Dec
2022.  However,
application has
been
subsequently
withdrawn)
None 
LONG2 South – Glassgreen
Village
21/01163/APP Approved None
Buckie R7 – Land at Muirton 21/01963/APP Approved Parking (iv) – Two streets did not meet quantitative element of the policy. 
Acceptable departure as there were overriding design and placemaking
benefits to
these streets, which outweigh this quantitative assessment criteria. 
R8 Land at Barhill Road 21/01224/APP Approved
(application was
subject to an
The proposal scored 7 “reds” signifying departures on all aspects of PP1 in
addition to failing to comply with the draft masterplan.
Page 210

Page 211

APPENDIX 1
appeal and
approved by the
DPEA)
Lhanbryde R2 – Garmouth Road 20/01615/APP Approved None subject to conditions. 
Table 11: Table showing the number of Quality Audits completed 2021/23. 
3.3  Additional Planning Policy Guidance 
At the time of writing the 2021 Monitoring Report, the new placemaking policy had only been adopted for 1 year.  While improvements in the standards of
design were noticeable in terms of the layouts received and the changes negotiated by Officers it was tricky to ascertain how well the new policy was
delivering high quality developments given the relatively short period of monitoring. 
Throughout the time period of this Monitoring Report, additional planning guidance was prepared to aide developers, agents, and Officers interpret some of
the MLDP policies and provide further detail and clarity.  This included guidance on how to achieve “greens” in the QA as well as a number of other key
Placemaking and policy areas. 
The following is a summary of some key design areas which the guidance covers which are relevant to the interpretation of the Placemaking Policy; 
• Parking – The issue of streets and developments being visually dominated by parked cars is a long standing issue.  The removal of cars from streets
brings many benefits in terms of making streets more visually attractive, encourage social interaction, increased natural surveillance, and increasing
biodiversity as more space is left for gardens and boundary treatments.  The guidance provides clarity on section (vi) Parking of PP1 and provides
examples of what types of arrangements are deemed acceptable.
• Placemaking Statement – Further detail and a template as to what type of information is required to be submitted. This covers a number of key
design areas with examples of good practice to help applicant achieve green in the QA.  
• Landscaping – Detail of what type of species will be acceptable in developments.  Provides information relating to what species will support
biodiversity and provide seasonal colour and pollination opportunities.
• Biodiversity – Applicants must provide biodiversity statements which must be a standalone document.  The guidance provides information as to
what is expected and what must be dzemonstrated by applicants.
• Safe Environments – Detail on how layouts can be safe and welcoming by designing out opportunities for crime and anti-social behaviour.  For
example having public fronts and private backs, the use of “turn a corner buildings” on key plots, and ensuring that all paths and areas of open
space are overlooked with good natural surveillance.  
Page 211

Page 212

APPENDIX 1
• Inclusive and Accessible Play - Play areas in new developments must be inclusive and accessible, providing children and young people of different
abilities with equal access to high quality social and play provision.  The guidance provides clarity as to what exactly is expected to be provided with
a park hierarchy setting out how many pieces of equipment must be provided including inclusive, non-inclusive and wheelchair specifications.  The
next LDP will continue to seek to ensure that all open and green spaces including allotments are fully accessible for all users. 
3.4  Observations and Trends in Placemaking 
Character & Identity 
The following highlights some of the key areas where improvements have been made to both the design of layouts and the information provided in detailed
submissions since the adoption of the MLDP 2020.   
• There has been an improvement in the standard of placemaking statements that have been received since the adoption of the MLDP 2020.  Officers
have ensured that these provide a thorough townscape analysis to ensure that the development is reflective of the location in terms of street
pattern, architectural details, landscaping, natural features/topography etc.  There has also been an increased use of 3D visualisations which helps to
understand what the proposal will look like and how it responds to the site and wider landscape.
• Greater differentiation between and within character areas is now being achieved that goes beyond different house types.  This includes variation
between renders, street materials, landscape/planting, and architectural details.   
Open Space 
• There has been a significant reduction in areas classed as being “leftover” space that lacks any function as a result of PP1 Placemaking and Policy
EP5 Open Space.   All proposals must comply with the quantitative and qualitative aspect of Policy EP5.  All applications over the time period of this
report met this standard and complied with policy.
• Open spaces have become focal points in developments and have clear multi-functional benefits such as providing play areas, seating areas,
blue/green habitats, and food growing opportunities.
• Good quality open spaces are seen as being fundamental to delivering attractive developments and improving the mental health and well being of
residents.  The provision of benches (including accessible benches) and other forms of seating within these spaces and along key routes is now
standard which provides good opportunities for social interaction and rest.
• Additional Planning Policy Guidance was introduced to ensure that high quality play areas were introduced and that they were inclusive and
accessible.  This ensures that at least 50% of play equipment provided in play areas is to inclusive standards and integrated throughout the layout. 
The additional guidance provides clarity to developers with regards to both the quantity and type of equipment that must be provided.
Page 212

Page 213

APPENDIX 1
• All open spaces are now planted with a variety of species including shrubs, fruit trees, and woodland planting to create attractive spaces with
seasonal variation that supports and enhances biodiversity.  Where tree planting is proposed semi mature trees are being provided.  This ensures
that developments are attractive from the outset and avoids the planting of small whips which are prone to damage and can take several years to
mature.   
• Food growing opportunities such as raised beds or food growing trees shrubs provide and encourage social interaction within communities.
However, guidance will be updated to ensure that these are fully accessible for wheelchair users ie waist high.
• Since the adoption of the MLDP 2020, the integration of blue infrastructure has increased significantly as there is a desire to move away from large
single SUDs ponds, not only to from a visual perspective but also in terms of supporting biodiversity.  Planted swales are being proposed as standard
features and have been successfully incorporated not only within areas of open space but also by roadsides which helps to improve the
attractiveness of developments.  Similarly rain gardens and other bio-retention features are now being incorporated into layouts as standard
features which is aided by the QA process. 
Landscaping 
• Since the adoption of the MLDP 2020 the standard and quality of landscaping plans has improved which reflects the importance that landscaping
can have on the character of a development.  As such the conditioning of landscape plans is now no longer acceptable.  Recently approved
landscape plans provided details relating to numbers, species, height and girth of trees, as well as providing seasonal variation and food growing
opportunities.
• The additional planning guidance that was prepared provides significant detail and clarity as to what is required and provides information relating to
what type of planting (height, species, girth etc) will be deemed acceptable.
• An issue that was previously highlighted in the 2021 Monitoring Report was the inconsistency between plans as often landscape plans did not match
with what is shown with site plans.  This can make it difficult to assess a proposal if landscaping is being proposed as visual mitigation for example. 
To address this Officers make it clear to developers that all plans received must match up as failure to do so can impact on the time to make an
assessment. 
Car Parking 
• The visual dominance of parked cars in developments is a recurring and longstanding problem that was identified in previous Monitoring Reports. 
The requirement for 50% of parking on all streets to be behind the building line has seen significant improvements made to the character of streets
as they are less visually dominated by parked cars.
• To aide with the interpretation of this policy requirement additional planning policy guidance was provided to help developers understand the policy
and what parking arrangements will be acceptable or not.  This guidance has been useful and provides clarity when negotiating changes.
Page 213

Page 214

APPENDIX 1
• Parking plans are being provided by developers which define each street and clearly highlight each number of spaces showing how the layout
complies with policy as well as allowing an easier assessment to be undertaken.  
• Communal parking areas continue to be a challenge, particularly where flats and terraced housing are proposed.  While the policy continues to be
successful in breaking up communal parking where areas at intervals of 4 spaces with landscaping/planting, ensuring that these spaces are well
overlooked and not unattractive parts of the development can be challenging.
• The requirement that a detailed landscape plan is provided upfront remains essential to ensuring that appropriate landscape mitigation is provided. 
This requirement ensures that any planting is of an appropriate height and species to provide the necessary landscape mitigation. 
Public Art 
• Since the adoption of the MLDP 2020 all developments must include public art.  The additional planning policy guidance that was prepared seeks to
provide clarity and help developers understand what is expected.  It also provides further detail as to why this is required in terms of wayfinding and
legibility but also creating and reflecting local heritage and culture.
• While public art can be a standalone feature it does not necessarily need to be and can be built incorporated into the layout in other ways.  In
Buckie R7 the layout will provide standalone lighthouse sculptures but also a fishing boat climbing frame which reflects Buckie’s maritime and
fishing history. 
Biodiversity 
• The MLDP 2020 introduced Policy EP2 Biodiversity which is also embedded into PP1 Placemaking to support existing habitats as well as creating new
ones within developments.  Biodiversity plans are assessed through the QA process.
• Biodiversity enhancement and connections into existing networks continue to be a key element of the design of layouts.  A number of features such
as bat boxes, hedgehog highways and a greater variation of plants, shrubs, and trees all provide greater seasonal variation and pollination
opportunities.
• The continued integration of blue infrastructure through swales and rain gardens are becoming standard design features and not only improve the
visual appearance of developments but also improve and support biodiversity.
• In some instances some developers thought that the landscape plan would be enough to satisfy PP1 and EP2.  This approach is not acceptable. 
While landscaping can contribute to supporting biodiversity a separate biodiversity plan that goes beyond a landscape plan must be provided. 
Failure to do so would result in the layout failing to comply with Policy EP2 and PP1 by scoring a “red” in the QA. 
Page 214

Page 215

APPENDIX 1
Street Layout & Design 
• The policy has continued to deliver improvements to the street layout and connectivity of layouts.  Through the QA process layouts are permeable
and well connected by connecting into natural desire lines.
• Active travel continues to be supported through the provision well connected legible layouts.  Infrastructure such as cycle storage is now being
provided on every layout to support this key policy aim.
• The use of different street materials has become more common in helping to differentiate between character areas which helps to aide legibility and
add visual interest. 
3.5  Key Benefits 
A number of wide ranging benefits are being delivered as an outcome of the improvements to these key design areas.  These could only have been achieved
through the detailed nature of PP1 Placemaking.  As a result, well designed places benefit residents and communities through the creation of safe and
welcoming environments which has knock on benefits for mental health and well-being. The following are a summary of some of the key benefits attributed
to improving these key design areas as a result of PP1. 
• Well designed developments that are reflective of their surroundings and promote a “sense of place” are beneficial for mental health and well being
of residents.
• The significant reduction in streets being visually dominated by parked cars helps to create more attractive streets that prioritise people over cars. It
also helps to encourage social interaction and biodiversity by increasing the size of front gardens.  This also helps to create the perception that
streets are designed for people and not cars and therefore walking is encouraged.  Creating opportunities for social interaction is a key component
of good design and creating healthy and inclusive communities.
• Well connected routes that support active travel seek to prioritise cycling and walking over the car improving physical and mental health as well as
addressing climate change.
• Health and well-being is supported through the provision of high quality multi-functional open space.  Seating areas provide opportunities for rest,
social interaction, and inter-generational mixing.
• Play areas that are accessible and inclusive for supporting the delivery of healthy vibrant and inclusive communities.
• Increased and varied planting across development not only supports biodiversity and links to nature networks but also helps to improve the mental
well being of residents.  
• Food growing opportunities such as raised beds or food growing trees shrubs provide and encourage social interaction within communities.
Guidance will need to be updated to ensure that these are fully accessible ie are designed for wheelchair users and are waist high.
• Well designed neighbourhoods and open space are designed to reduce crime and anti-social behaviour by providing spaces that benefit from
natural surveillance and activity.
Page 215

Page 216

APPENDIX 1 
3.6  Conclusion 
The 2019, 2021 Monitoring Reports contain updates as to how both the MLDP 2015 and 2020 Placemaking policies have improved standards of urban
design.  As has been demonstrated, PP1 has continued to deliver improvements to Placemaking and the standards of information being submitted in
planning applications now that the policy has had time to “bed in”. 
NPF4 was adopted in February 2023 and the next Monitoring Report will provide a better understanding of how the revised QA is operating in assessing
proposals against PP1 and NPF4 which could have implications for the MLDP 2027. 
Page 216

Page 217

APPENDIX 1
4 Providing a Generous Employment Land Supply 
4.1  Introduction 
To facilitate economic development and support diversification of the economy the MLDP seeks to provide a generous supply of employment land that
meets the needs for different types of employment.  This has been a long standing identified issue in Moray and as was highlighted in the 2018 Main Issues
Report, creating a greater mix of uses across newly identified employment sites in the MLDP could aid the delivery of serviced land as some higher value
uses could aid site viability. 
4.2 Effective Employment Land 
Established Supply 225.98 ha 
Effective/Marketable Supply 99.87 ha 21 sites ha
Effective General Industrial 63.28 ha 16 sites ha
Effective High Amenity 36.59 ha 8 sites ha
Immediate Available Supply 33.34 ha 6
Constrained Supply 78.03 ha 15 sites 
Table 12: Summary of Employment Land Supply 2022 
4.3  General Summary 
• There is 63.28ha of effective/marketable general industrial land providing a generous supply equating to approximately 20 years.
• The Elgin and Buckie market areas have relatively healthy supplies of general industrial land providing at least the equivalent of 15 years supply.
• Around 34% (78.03ha) of the established supply has some form of constraint that is likely to prevent land being brought forward in the next five
years.
• In Forres there remains a significant shortage of general industrial land with approximately 2.75ha of industrial land left.  I4 Easter Newhouse
remains constrained due to infrastructure costs.
• In Keith the general industrial supply is limited.  However, there is a LONG allocation that could be released should the space be required.
• The shortage of employment land in Speyside has been a long standing identified issue.  The shortage of identified sites for employment uses means
that there is a reliance on windfall proposals.  Within site R2 Speyview in Aberlour 1ha of land is reserved for employment land uses to the south of
the site but this does not form part of the residential development that has recently been consented.
Page 217

Page 218

APPENDIX 1
• Immediately available land has decreased by 1.71ha since 2021 with there being 33.63 ha (net) available across 6 sites.  
• In addition to the longstanding issues identified in Forres and Speyside, the good progress and take up of land at Elgin Business Park/Barmuckity
suggests the Immediately Available Supply in the Elgin Market Area will become limited in the next few years and will need to be addressed in next
Local Development Plan.
• In the last year, 1.24 ha of land was developed.  This includes completion or occupation of sites at I7 Barmuckity, OPP4 Ashgrove in Elgin, and an
energy management facility at I3 in Keith. 
4.4  Observations and Trends in Employment and Business Land 
General 
• Since the 2021 Monitoring Report there have been 30 applications on employment sites.
• A number were for non-employment uses including an inflatable leisure facility at I2 Chanonry Elgin, a sandwich shop and drive through at I6
Linkwood East, an office block at I7 Barmuckity.  The sandwich shop and drive through on I6 Linkwood East was approved by the Local Review Body.
• The 2022 Employment Land Audit reported a high uptake at I7 Barmuckity/Elgin Business Park.  There is now limited availability with many of these
plots now developed, sold or under offer.  It is therefore it is anticipated that the level of immediately available land in the Elgin Market Area will
reduce significantly over the next few years.  Given this there is a need to ensure that new industrial and employment land sites are progressed to
ensure that there is land available to meet any future demand.
• A review of data from the Council’s Address Gazetteer has allowed a high level analysis of non-industrial/business uses (i.e. not use class 4 business,
use class 5 general industrial, or class 6 storage or distribution) on industrial estates to identify what types of non-industrial/business uses are
present on industrial estates and where the proportion of these uses is greatest. 
➢ This highlights that there is pressure for restaurants/cafes, showrooms, and leisure activities including gyms. 
➢ The majority of sites identified in LDP2020 as Industrial Estates have predominantly employment uses (i.e. over 85% of addresses
identified within the Gazetteer were for employment uses within class 4, 5 and 6). 
➢ The exceptions to this are I4 Tyock, I5 Pinefield, I6 Linkwood East in Elgin and I4 Shore Street Lossiemouth where a greater proportion of
addresses were for non-employment uses. Within I4 Shore Street there is a high proportion of residential addresses. 
Where there are greater numbers of “other uses” this can change the character of the industrial estate and undermine the intended use. This could result in
making it more difficult for heavier industrial uses to locate to these industrial estates and mean new employment land is taken up more rapidly. 
Page 218

Page 219

APPENDIX 1 
4.5 Moray Business Property Needs Study 
Consultants were commissioned to provide up to date information and analysis of the current and projected demand for commercial land and buildings to
help inform the Evidence Report for the new Local Development Plan and the Regional Spatial Strategy.   
The report highlighted that demand for employment land is anticipated from existing businesses looking to expand and relocate, and identified key growth
sectors where demand is likely to come from.  It highlighted that Moray has several land-hungry extraction and production industries as well as growth
prospects at the other end of the spectrum in technology-rich sectors which require more space per job than traditional industrial premises.   
These require a generous approach to employment land estimates and allocations which will need to be considered in the next LDP.  To accommodate these
anticipated trends the report states that over the next LDP period (2027 – 2037) approximately 5–6 ha per annum will be required which is 20-25% higher
than the 4-5ha used for the LDP 2020.  The study recommends that this requirement is split across market areas in the same way as the 2020 LDP with 54%
of the requirement directed towards the Elgin market area, 15% to the Forres and Buckie market area and 8% to the Keith and Speyside market areas.
In addition, pressure is being put on several of Moray’s rural areas with a clear trend in long established industries such as Distilling, alongside the renewable
and the wider energy sector with the drive towards net zero.  In terms of employment in the manufacturing sector, the report identifies the electoral ward
of Speyside and Glenlivet having the greatest concentration of employment. 
In 2021, total employment in the manufacture of food and beverages was 3,250 in Moray. The sector accounted for 8.3% of all employment in the local
authority area, compared to 1.9% of employment across Scotland as a whole. Almost half of the jobs in the sector (1,600) were in Speyside Glenlivet, which
hosts the Glenlivet, Glenfiddich and MacCallan distilleries which are the largest single-malt producers by volume globally, as well as the Walkers Shortbread
factory. 
A clear pattern of development has been noted with several of these established indigenous businesses expanding in their current locations due to their
locational needs.  Of note is the trend for applications relating to the desire for new or expanding whisky storage warehouse facilities. As highlighted below,
this is putting pressure on the periphery of certain settlements (on sites not designated in the MLDP) and in rural locations due there being a lack of suitable
sites available to accommodate their requirements.   
4.6 Emerging Trends 
This chapter of the Monitoring Report primarily focuses on development proposals of designated Employment Land sites.  However, the Monitoring Report
also plays an important role in picking up emerging land use planning issues.  This is particularly important given that the next LDP is currently under being
Page 219

Page 220

APPENDIX 1
prepared.  While the next section may not directly relate to designated sites in the LDP, some of the issues may have future policy implications as well as
implications for these sites and the wider employment land supply.  It will be for future Monitoring Reports to continue to assess and monitor these trends. 
Energy & Renewables 
• It is anticipated that across Moray there will likely be an increase in demand for proposals and the associated grid infrastructure relating to the
renewable energy sector.  This includes battery storage and energy management facilities, Anaerobic Digestion facilities, and solar arrays.  While
there have been significant pressures around Blackhillock and Keith, there has also been interest for these types of facility on designated
employment land sites and other areas across Moray, including on designations such as Designed Gardens & Landscapes and Special Landscape
Areas (SLA).  This includes an application for a battery storage facility on the I8 Site in the Findrassie Masterplan which was recently approved even
though it was regarded as a departure from the Local Development Plan and site designation which formed part of the Findrassie Masterplan.  This
trend has potential implications for the MLDP 2027 as these facilities do not fall within the use classes normally associated with industrial estates
(use class 4 business, use class 5 general industrial, and class 6 storage or distribution).  This raises potential issues regarding the employment land
supply in Moray should more of these facilities be approved on designated sites, given that they are land hungry and offer limited permanent
employment opportunities.  The potential implications are that the MLDP may not be able to meet the demand for uses that would normally be
associated for industrial and employment use sites which has been a long standing issue in Moray.
• Below is a table showing two approved applications for battery storage facilities over the Monitoring Report period.  Given that this infrastructure is
required to support the National Grid it is anticipated that this will demand will likely increase.  Although these applications are outwith the
settlement boundary, there is concern that there could be demand for these facilities on designated employment land sites in the future which
could raise issues with the employment land supply. 
22/00715/APP Land at Drum
Farm Keith
Battery Storage
Facility
Site located immediately outwith
the Countryside Around Towns (CAT)
designation.
22/01488/APP Land adjacent to
Westerton Road
Keith
Battery Storage Site located within the CAT. 
Table 13: Approved applications for battery storage facilities over the report period 
• To address this trend in the wider Keith area, the Keith Green Energy and Infrastructure Framework was commissioned by the Council which
provides a strategic framework that seeks to guide development proposals for grid infrastructure and energy systems/storage associated with
renewable energy to the most appropriate locations in and around Keith.  Based on a landscape sensitivity assessment, the Framework identifies
Page 220

Page 221

APPENDIX 1
potential development sites for a range of uses and associated landscape mitigation required.  The framework has not been adopted yet and future
monitoring reports will require to monitor applications for these types of use.  While this framework addresses the issue in the wider Keith area, it is
worth noting that there are increasing pressures in other areas of Moray as well.
• Around the Buckie area there is significant opportunity associated with the renewable energy sector with expected growth in on and off shore wind
and hydrogen developments as well as maintenance activity and pressure.  Although falling outwith the period of this report, there have also been
applications submitted for Anaerobic Digestion plants.  At the time of writing these have still to be determined.  Due to their nature these proposals
are often located in rural areas, can be of significant size and massing, are land hungry, and provide limited permanent employment opportunities.  
While these applications cannot be prejudged, these types of applications could have significant impacts on the landscape should this trend
continue and there is the possibility that applications could be submitted for these types of proposals on designated sites.  They also could have
potential issues with the Countryside Around Towns (CAT) designation with potential for policy conflict.  This could have implications for the MLDP
2027 and the approach it takes to rural development proposals, particularly in terms of the locational justification that is provided. 
Manufacturing - Food & Beverage 
• A key industry for Moray is whisky distilling and this area has seen considerable expansion over recent years, including bonded warehousing,
upgrading visitor experiences, and investing in renewable technologies, which is expected to increase. These businesses are long established and
often in rural areas. 
• There have been several applications received for expansions to distilleries relating to the erection of malt processing and storage facilities along
with the associated infrastructure.  This is putting pressure on the periphery of certain settlements (such as Rothes) as applications for this use have
been submitted on sites not designated in the MLDP.  
• While there have been several smaller applications for extensions to existing whisky storage facilities, there have been three large applications of
note relating to distilling (see table below).  Two were in Rothes and one just outside of Portgordon.  Both Rothes applications were located on the
periphery of the settlement outside of the settlement boundary and were therefore departures from the MLDP.  There is also known further
development interest for similar types of development within the Rothes area.
• Based on recent applications and location of these industries, this pressure is expected to continue in the Speyside and the Buckie area.  
• The lack of available sites for these types of proposals will need to be taken into consideration by the next MLDP to ensure that the requirements of
these industries can continue to be met.  This will also have implications in terms of the locational justification that is provided with applications
particularly given these proposals are large and land hungry and are often located in rural areas.  A tailored approach or strategic framework may
need to be considered to address this issue.
• Below is a table of applications received for the purposes of distilling that fell outwith designated sites in rural areas. 
Page 221

Page 222

APPENDIX 1
Application
number
Settlemen
t
Proposal Approved
/Refused
Policy Departures/comments
22/01673/EIA Rothes Erection of 10 whisky maturation
warehouses and associated
infrastructure
Approved EP6 Settlement Boundaries – Considered acceptable as site is obscured from the
A941 and the majority of the settlement. 
EP7 Forestry, Woodland & Trees acceptable
Departure for removal of woodland & trees on the basis of the economic benefits
associated with supporting the distilling industry 
21/01901/EIA Rothes Erection of malt
production facility with associated
infrastructure 
Approved EP6 Settlement Boundaries – Locational justification provided with reference to
PP2 Sustainable Economic Growth.
22/01269/APP Portgordo
n
4 Whisky Storage Warehouses Approved Expansion was part of the existing facility.  Concerns raised with visual impact of
the proposal, lack of landscaping and locational need. 
Table 14: Approved applications relating to distilling. 
4.7 Conclusion 
• Despite an overall generous supply of land there are significant shortages of industrial land in the Forres and Speyside areas. Both these areas are
included within an action to deliver employment sites and industrial units as part of the Economic Recovery Plan. 
• Development in Elgin, particularly at I7 Barmuckity/Elgin Business Park, is progressing well and work is needed to bring new sites forward to ensure
a continued supply of land. 
• Pressure for leisure and retail uses on industrial estates is anticipated to continue and will require to be monitored to assess the effectiveness of
Policy DP5 Business and Industry and DP7 Retail/Town Centres.
• There are emerging trends for development proposals such as battery storage facilities which will need to be monitored.  This could have implication
for the employment land supply and the next LDP if applications are approved on designated employment land sites.
• Demand for the expansion of distilleries is expected to increase, in particular for warehouse storage facilities.  This is currently putting pressure on
the periphery of certain settlements such as Rothes where demand is high but there is a lack of available designated sites.  The next LDP will have to
consider how these requirements can be accommodated as well as the level of locational justification that is required to be provided with
applications. 
Page 222

Page 223

APPENDIX 1
5. Taking an Infrastructure First Approach 
5.1 Introduction 
The 2018 Main Issue Report highlighted the need to align stakeholders, phasing, financing and infrastructure investment over the long term to provide the
transportation, education, health and other infrastructure to support Moray’s growing and ageing population.  To address this the MLDP 2020 contained its
own policy on infrastructure. 
Developer obligations can form part of the funding for education infrastructure where the 5 tests of Circular 3/2012 and NPF4 policy 18 are met.  Given that
development viability is a key consideration in development planning, the level of developer obligations sought does not cover the full cost of education
infrastructure.  Therefore, the timescales for delivery is largely dependent on the availability of other forms of funding such as the Scottish Government
Learning Estate Investment Programme (LEIP).   
A review of the Developer Obligations SG is currently underway.  The Learning Estate Strategy (LES), School Roll Forecast (SRF) and any other associated
documents or decisions by the Moray Council will continue to inform the level and type of developer obligations sought.  The review will inform the LDP27,
Delivery Programme and any associated planning guidance.   
5.2  MLDP 2020 Policy PP3 Infrastructure and Services 
• Policy PP3 Infrastructure and Services is a primary policy within the Moray Local Development Plan (MLDP) 2020 in recognition of the importance of
an infrastructure first approach. 
• New infrastructure necessary to facilitate development is set out in the MLDP 2020 on the spatial strategy maps, settlement statements and maps. 
• The Council seeks developer obligations towards education, healthcare, transportation and a 3G pitch in Forres in accord with policy PP3 of the
MLDP 2020 and the Developer Obligations Supplementary Guidance (SG)
• Site specific infrastructure requirements, methodology and rates to seek developer obligations towards the identified infrastructure requirements
are set out in the statutory Developer Obligations Supplementary Guidance (SG). The current SG came into effect on 30 September 2020 following
approval of the Scottish Government and the Council`s Planning and Regulatory Services Committee.  This forms part of the adopted MLDP 2020
and is currently under review.
• Moray Council facilitate a LDP Delivery Group which includes a wide range of representatives from NHS Grampian, Moray Health and Social Care
Partnership (HSCP), Scottish Water, Scottish Gas Networks (SGN), SSEN, Transport Scotland, and Council Services for Education, Transportation,
Sports and Recreation, and Housing.  Other representatives attend, as and when required.  In accord with the Place Principle, opportunities to work
together to share resources are identified and explored through this Group as well keeping the evidence base up-to-date.   This Group informed the
Page 223

Page 224

APPENDIX 1
LDP2020 infrastructure requirements as well as subsequent reviews of the SG, and similarly the Group will inform the evidence base for the LDP27
and Delivery Programme.  
• Commuted sums for affordable housing are not developer obligations, however the Strategic Planning and Development Team are also responsible
for collecting and administering these funds as well as developer obligations. Therefore, commuted sums received and spent will be included within
this section. 
In terms of the necessary infrastructure to facilitate development growth, an approach similar to that currently set out in the Moray Local Development Plan
2020 (LDP 2020) and associated Development Obligations Supplementary Guidance (SG) will be considered for the LDP27.  The LDP 2020 Primary Policy 3
(PP3) Infrastructure and Services together with the Settlement Statements sets out the level, type and location of infrastructure necessary to support
development.  Sites expected to contribute are also identified.  Further detail is set out in the SG which allows regular reviews to be undertaken to reflect
changing local circumstances or policies, inflationary increases for rates, etc. (i.e.  areas that cannot wait for a 10-year LDP review).  The LDP 2020 Delivery
Programme sets out who, when, how and by whom the infrastructure will be delivered, and priorities, as far as practically possible.   
5.3  Learning Estate Strategy (LES) 
• Developing a strategic approach to the Learning Estate-Moray document was approved by Full Council on 16 December 2020, which will guide the
long term development of the learning estate in Moray.
• The Moray Council Learning Estate Strategy 2022-32 (LES) aligns with both the Scottish Government’s ‘Scotland’s National Learning Estate Strategy:
Connecting Peoples, Places and Learning’ and the National Improvement Framework and the local priorities set out in Moray Council’s Local
Outcomes Improvement Plan (LOIP) and Corporate Plan.  
• The LES covers Early Learning, Additional Support Needs (ASN), and Primary and Secondary Education.  It sets out a 10-year plan on how Moray
Council will work to optimise its investment of resources in a prioritised manner to meet the future needs of learning and teaching.  The LES
aspirations and key drivers of excellence, inclusion, place and sustainability are underpinned by 10 Guiding Principles of the National Learning Estate
Strategy.
• A range of factors influence the LES proposals and their delivery.  These include pre-school/school roll trends, Additional Support Need (ASN)
requirements, early learning centre/school/enhanced provision capacities, space to grow, building condition (fabric, safety and security), building
sustainability, educational factors such as opportunities for outdoor learning and pupil choice, community benefit factors, partnership opportunities
to align building investment across local public sector providers, and net zero targets. Together these factors will determine future recommendations
to close, merge, extend, build, rezone or mothball educational facilities in Moray.  The LDP informs, and is informed by, the LES to determine the
future planning and coordination of the learning estate with development in Moray.  The outcome of any actions within the LES that has spatial
implications (i.e. rationalisation or expansion of the estate) will be reflected in the LDP.   
Page 224

Page 225

APPENDIX 1 
5.4  Developer Obligations 
• Financial contributions of £446,622.06 have been received between 27 July 2021 and 26 July 2022 towards affordable housing, healthcare, primary
education, secondary education, 3G pitch in Forres and Transportation interventions. The breakdown of these can be found in Table 15. 
• Financial contributions of £305,991.91 have been received between 27 July 2022 and 26 July 2023. The breakdown of these can be found in Table
16. 
• A total of £1,166,938.40 was secured between 27 July 2021 and 26 July 2022 towards affordable housing, 3G pitch in Forres, Transportation,
Healthcare and Primary Education via Section 75 legal agreements and simplified agreements. These contributions will be received as triggers (i.e.
completion of units) are reached in the future. The breakdown of these can be found in Table 17.
• A total of £949,861.93 between 27 July 2022 and 26 July 2023 was secured via Section 75 legal agreements and simplified agreements. The
breakdown of these can be found in Table 16.
• A total of £73,863.35 developer obligations were spent between 27 July 2021 and 26 July 2022 and £11,745.43 between 27 July 2022 and 26 July
2023. The breakdown of this expenditure is further detailed in the tables below. 
Buckie ASG EA ASG EH ASG Forres ASG Keith ASG Lossiemouth
ASG
Milne`s ASG Speyside
ASG
TOTAL
Healthcare £7,526.00 £0.00 £2,684.20 £10,909.72 £6,701.20 £5,482.80 £14,835.00 £4,568.00 £52,706.92
Primary
Education
£0.00 £0.00 £10,717.60 £4,024.52 £0.00 £0.00 £0.00 £0.00
£14,742.12
Secondary
Education
£0.00 £0.00 £0.00 £111,627.91 £0.00 £0.00 £0.00 £0.00
£111,627.91
3G pitch £0.00 £0.00 £0.00 £1,251.30 £0.00 £0.00 £0.00 £0.00 £1,251.30
Transportation £0.00 £0.00 £726.24 £7,737.80 £1,331.44 £0.00 £302.60 £242.08 £10,340.16
Affordable
housing
£28,000.00 £96,000.00 £11,250.00 £61,578.65 £20,000.00 £12,000.00 £13,625.00 £13,500.00
£255,953.65
TOTAL £35,526.00 £96,000.00 £25,378.04 £197,129.90 £28,032.64 £17,482.80 £28,762.60 £18,310.08 £446,622.06 
Table 15:  Developer obligations and affordable housing commuted sums received 2021-22
Page 225

Page 226

APPENDIX 1 
Buckie ASG EA ASG EH ASG Forres ASG Keith ASG Lossiemouth
ASG
Milne`s ASG Speyside
ASG
TOTAL
Healthcare £91.08 £0.00 £0.00 88,987.24 £5,178.20 £11,574.80 £2,161.60 £1,722.60 £109,715.52
Primary
Education
£0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
£0.00
Secondary
Education
£0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
£0.00
3G pitch £0.00 £0.00 £0.00 £6,258.90 £0.00 £0.00 £0.00 £0.00 £6,258.90
Transportation £0.00 £0.00 £0.00 £1,513.00 £0.00 £363.12 £1,694.56 £0.00 £3,570.68
Affordable
housing
£16,602.15 £0.00 £0.00 £27,197.60 £46,250.00 £22,500.00 £65,772.06 £8,125.00
£186,446.81
TOTAL £16,693.23 £0.00 £0.00 £123,956.74 £51,428.20 £34,437.92 £69,628.22 £9,847.60 £305,991.91 
Table 16: Developer obligations and affordable housing commuted sums received 2022-23
Page 226

Page 227

APPENDIX 1 
Table 17: Developer obligations and affordable housing commuted sums secured 2021-22 
21/01176/
APP
21/01284/
APP
20/00590/
APP
20/00317/
APP
19/01614/
APP
20/00905/
APP
20/01615/
APP
20/00278/
APP
Total
Primary Education £0.00 £0.00 £0.00 £0.00 £70,554.2
5
£0.00 £0.00 £0.00
£70,554.25
Secondary Education £0.00 £0.00 £0.00 £0.00 £18,851.3
0
£295,240.
00
£0.00 £0.00
£314,091.30
Healthcare £1,360.20 £580.00 £21,370.0
0
£0.00 £21,094.4
5
£583,596.
00
£31,678.4
0
£57,276.0
0
£716,955.05
Transportation £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Sports and
Recreation
£121.80 £0.00 £1,216.00 £0.00 £0.00 £0.00 £0.00 £0.00
£0.00
Affordable Housing £4,000.00 £8,000.00 £32,000.0
0
£20,000.0
0
£0.00 £0.00 £0.00 £0.00
£1,337.80
Total
£5,482.00 £8,580.00
£54,586.0
0
£20,000.0
0
£110,500.
00
£878,836.
00
£31,678.4
0
£57,276.0
0 £1,166,938.40
Page 227

Page 228

APPENDIX 1 
22/00872/
APP
22/01583/
PPP
20/00795/
APP
22/00996/
APP
22/00021/
APP
22/00042/
APP
20/01455/
APP
19/01510/
APP
21/00739/
APP
22/00996/
APP 
Total
Secondary
Education
£0.00 £0.00 £39,688.0
0
£23,232.0
0
£0.00 £0.00 £0.00 £0.00 £271,854.
15 
£23,232.0
0
£358,006
.15 
Healthcare £2,267.00 £1,413.00 £24,252.0
0
£9,792.00 £1,813.60 £1,218.40 £92,947.0
0
£161,976.
00 
£127,607.
60 
£9,792.00  £433,078
.60 
Transportat
ion
£302.60 £0.00 £0.00 £1,452.48 £242.08 £0.00 £0.00 £0.00 £14,514.1
4
£1,452.48  £17,963.
78 
Sports and
Recreation
£203.00 £0.00 £0.00 £0.00 £162.40 £0.00 £8,323.00 £0.00 £0.00 £0.00 £8,688.4
0
Affordable
Housing
£4,937.50 £4,125.00 £67,500.0
0
£22,500.0
0
£4,937.50 £5,625.00 £0.00 £0.00 £0.00 £22,500.0
0
£132,125
.00 
Total
£7,710.10 £5,538.00
£131,440.
00
£56,976.4
8 £7,155.58 £6,843.40
£101,270.
00
£161,976.
00
£413,975.
89
£56,976.4
8
£949,861
.93 
Table 18: Developer obligations and affordable housing commuted sums secured 2022-23 
Page 228

Page 229

APPENDIX 1 
Buckie High
ASG
Elgin
Academy
ASG
Elgin High
ASG
Forres
Academy
ASG
Keith
Grammar
ASG
Lossiemouth
High ASG
Milnes High
ASG
Speyside
High ASG
Total
Indoor/outdoor
sports
£0.00 £987.00 £871.00 £3,200.00 £0.00 £0.00 £0.00 £0.00
£5,058.00
Playing Fields £0.00 £432.00 £538.00  £0.00 £0.00 £0.00 £0.00 £970.00
Community
Facilities
£0.00 £0.00 £11,803.90 £24,012.92 £0.00 £0.00 £0.00 £0.00
£35,816.82
Community Halls £0.00 £0.00 £0.00 £6,755.96 £0.00 £0.00 £0.00 £0.00 £6,755.96
Community
Woodland
£11,350.57 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £11,350.57
Town Centre £7,752.81 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £7,752.81
Libraries £0.00 £2,784.88 £1,239.56 £1,495.00 £639.75 £0.00 £0.00 £0.00 £6,159.19
Total £19,103.38 £4,203.88 £14,452.46 £35,463.88 £639.75 £0.00 £0.00 £0.00 £73,863.35 
Table 19: Developer obligations and affordable housing commuted sums spent 2021-22 
Page 229

Page 230

APPENDIX 1 
Buckie
High ASG
Elgin
Academy
ASG
Elgin High
ASG
Forres
Academy
ASG
Keith
Grammar
ASG
Lossiemouth
High ASG
Milnes High
ASG
Speyside
High ASG
Total
Community
Facilities
£0.00 £0.00 £0.00 £11,607.05 £0.00 £0.00 £0.00 £0.00 £11,607.05
Community Halls £0.00 £0.00 £0.00 £138.38 £0.00 £0.00 £0.00 £0.00 £138.38
Total £0.00 £0.00 £0.00 £11,745.43 £0.00 £0.00 £0.00 £0.00 £11,745.43 
Table 20: Developer obligations and affordable housing commuted sums spent 2022-23 
Page 230

Page 231

APPENDIX 1
6. Pressures on Moray’s Landscape and Rural Cultural Heritage 
6.1  Applications within Special Landscape Areas (SLAs) 
MLDP Policy EP3 Special Landscape Areas and Landscape Character aims to protect landscapes from inappropriate development. Within SLAs, proposals
must not prejudice the special qualities of the designated area, avoid adverse effects on the landscape and visual qualities and adopt the highest standard of
design. In Rural Areas (outwith settlement and rural grouping boundaries) development must also be for specified uses. 
2021/22
• In Urban Areas, four applications were refused on the grounds that the proposal failed to reflect the traditional settlement character, had an adverse
impact on character or was contrary to the settlement designation. One application was approved as an acceptable departure as the proposal
complied with MLDP Policies PP1 Placemaking and DP1 Development Requirements and wouldn’t compromise the special qualities.
• Four applications were refused in Rural Areas on the basis of adverse impact on character, cumulative build-up and location within ‘sensitive’ area. 4
applications were approved as acceptable departures form MLDP Policy EP3 as development was for military air traffic control services, digital
infrastructure, would have a low impact or contributed to long-term planning of construction aggregates.
• There were 3 applications which crossed boundaries with Rural and Urban Areas. All three were consented as acceptable departures from MLDP
Policy EP3 – one on the grounds of sustainable economic growth (tourism), one due to the recognised need for parking in the area and one for its
low impact and wider tourism benefits.
• It is observed that the location of a development within the SLA and consideration of the requirement of MLDP Policy EP3 is not always being
referenced within Reports of Handling and reasons for refusal (where applicable). 
2022/23
• 8 applications were refused in Urban Areas between 2022 and 2023.  This included 3 dwellinghouses, a change of use to garden ground, and a
change of use of a house to a store. Reasons for refusal were on the grounds that development failed to adopt the highest standard of design, would
have an adverse impact on the landscape/special qualities or did not reflect the traditional settlement character.
• In Rural Areas, three applications were refused due to non-confirming uses that would impact on the special qualities of the area. Two applications
were approved as an acceptable departure on the basis that the uses were for the enhancement of digital infrastructure or would supersede an
extant consent resulting in a lower impact. 
6.2  Large-Scale Renewable Energy Developments 
Large scale renewable energy developments exceeding 50MW are determined by the Energy Consents Unit (ECU). In these circumstances, Moray Council
are a consultee rather than the determining authority.
Page 231

Page 232

APPENDIX 1 
2021/22 
• Berry Burn Wind Farm Extension, for 9 turbines (149.9m blade tip height), received consent in December 2021. The Council had raised no objection
to the proposal. 
2022/23
• Section 36 consent was issued in September 2022 for a Battery Electricity Storage System (BESS) facility at Blackhillock Substation, Keith. The
electrical export capacity of the development will be approximately 300MW.
• Following a conjoined Public Inquiry, Scottish Ministers consented two wind farms in October 2022 (which Moray Council objected to)  – Clash Gour
consists of 48 turbines with blade tip heights of 130m, 136.5, 143m, 149.5, and 180m whilst Rothes III consists of 29 turbines with blade tip heights
of 149.9m, 200m and 225m. 
• A pre-application scoping opinion for Teindland Wind Farm, consisting of approximately 17 turbines with blade tip heights between 149m and 230m,
was issued by the ECU in October 2022. Moray Council expressed concerns regarding the number, siting and heights of the proposed turbines which,
based on the proposed layout, has the potential to have unacceptable significant adverse impacts in addition to cumulative impact.   
6.3  Development within Open Spaces (ENVs) 
2021/22
• 6 applications directly impacting on ENV sites were determined between 2021 and 2022 including stores/workshop, car parking, overnight
caravan/campervan stances, an office extension and change of use to garden ground.
• 1 application was approved on the basis that the loss of ENV was for an acceptable use under MLDP Policy EP5 Open Space (essential community
infrastructure).
• 4 applications were consented as acceptable departures as they were small scale and would have no adverse impact on the ENVV designation
identified, with additional benefits such as tourism facilities and economic growth.
• Combined, these applications resulted in the loss of 0.124ha of designated open space.
• One of the applications (car parking) was refused as an unacceptable departure from MLDP Policy EP5 and ENV4. 
2022/23
• Between 2022 and 2023, 4 applications were consented that had direct impacts on ENV designations. Proposals included residential developments,
a toilet block extension and change of use to garden ground.
• Two applications were approved as acceptable departures on the grounds that the loss of open space would achieve wider Quality Audit (MLDP
Policy PP1) aims or was a small extension of an existing property which wouldn’t impact on the wider ENV designation.
Page 232

Page 233

APPENDIX 1
• Another application was initial identified as an acceptable departure on the grounds that the proposal would have no adverse impact on the ENV
designation and the redevelopment of brownfield land within the ENV was identified as an opportunity in the Open Space Strategy. Following the
adoption of NPF4, this application was deemed to comply with MLDP Policy EP5 as the application complied with NPF4 Policy 9 Brownfield, vacant
and derelict land and empty buildings which superseded the MLDP.
• These applications resulted in the combined loss of 0.68ha of open space.
• One application was refused as an unacceptable intrusion into the ENV, and this was upheld by the LRB on review. 
6.4  Development on Prime Agricultural Land 
Prime agricultural land is that identified as being Class 1, 2 or 3.1 in the land capability classification for agriculture, based on environmental and soil
characteristics, as developed by the James Hutton Institute. MLDP Policy DP1 requires development to avoid sterilising prime agricultural land whilst NPF4
Policy 5 Soils will only support development on such land where is it for specific uses and it has been demonstrated that the layout and design of the
proposal minimises the amount of protected land required. 
2021/22
• 18.47ha of Class 3.1 was lost in respect of an application for residential development in Buckie, approved by the DPEA on appeal. The site is
designated in the MLDP 2020 for residential use. The presence of prime agricultural land was not acknowledged in the Reporter’s findings. 
2022/23
• 28ha (0.18ha of Class 2 and 28.82ha of Class 3.1) was lost to development across 9 applications between 2022 and 2023.
• Of this, 12.84ha were designated sites within the MLDP 2020.
• It is observed that the presence of prime agricultural land is not always being referenced within Reports of Handling. 
6.5 Development on Deep Peat 
Classes 1, 2 and 5 of the carbon and peatland classification, developed by NatureScot, indicate the likely presence of carbon-rich soils and deep peat. MLDP
Policy EP16 Geodiversity and Soil Resources seeks to protect the disturbance of soils and assure the effects of development are assessed and appropriately
mitigated. NPF4 Policy 5 will only support development on such land where is it for specific uses and have provided a detailed site-specific assessment. 
2021/22
• One application, for a large-scale wind farm, received consent between 2021 and 2022. Impacts on Class 1 and 5 peat soils were adequately
addressed through design and a Peat Management Plan. 
Page 233

Page 234

APPENDIX 1 
2022/23
• Between 2022 and 2023, 3 applications received consent for development on Class 1 and/or 5, and one application, where Moray Council were a
consultee on a Section 36 application, raised no objection but expressed concern about the potential impacts of 3 turbines on deep peat. 
• It is observed that the presence of carbon-rich soils and deep peat is not always being referenced within Reports of Handling. 
6.6  Trees and Woodland Removal 
Since the 2021 Monitoring Report, internal guidance has been introduced in relation to Tree Surveys which has resulted in the consistent submission of
surveys by appropriately qualified professionals. 
Development linked to the Kinloss Golf Course Masterplan accounts for 0.14ha of woodland removal across 2021/22 and 2022/23. The adopted masterplan
has sought to deliver a high-quality development within the setting of the golf course and introduced sensitively sited housing within the landscape. Planned
woodland removal and compensatory planting forms part of the masterplan’s Woodland Management Plan and as such is an acceptable departure from
MLDP Policy EP7 Forestry, Woodlands and Trees. Compensatory planting has, and will be, provided in appropriate phases of the development as per the
masterplan as part of a wider planting scheme and is therefore not included in the figures above. 
2021/22 
Type Amount lost to development  Compensatory Planting Secured
Trees 145 113
Groupings 2 -
Woodland (ha) 21.84 25.62 (+3.28 commuted payment) 
Table 21: Number/area of trees or woodland lost to development granted in 2021-2022 
• Between 2021 and 2022, planning consents resulted in the loss of 145 trees, 2 groupings and 21.84 ha of woodland.
• Justification for removal in most cases was due to it being technically unfeasible to retain the tress/woodland or achieved significant additional
public benefits, in compliance with MLDP Policy EP7.
• 20.7ha of woodland removal related specially to two applications – a national development project and the extension of an established business.
• In two applications, tree/woodland removal was deemed as an acceptable departure from MLDP Policy EP7 on the grounds that the proposal had
extant consent on the site and to meet operational requirements.
Page 234

Page 235

APPENDIX 1
• Three applications did not clearly identify compensatory planting and included this requirement within the minimum landscaping requirements for
the site. Compensatory planting should be over and above any other landscaping policy requirements to ensure that the loss of trees/woodland is
truly compensated. 
2022/23 
Type Amount lost to development  Compensatory Planting Secured
Trees 174 88
Groupings 7 -
Woodland (ha) 1.119 0.599 
Table 22: Number/area of trees or woodland lost to development granted in 2022-2023 
• Consents between 2022 and 2023 resulted in the loss of 174 trees, 7 groupings and 1.119ha of woodland. 
• Justification for removal in most cases was due to it being technically unfeasible to retain the trees/woodland or the proposal resulted in wider
additional public benefits. In four applications, removal was deemed as an acceptable departure from MLDP Policy EP7 on the grounds of ecosystem
threat, site conditions and wider economic benefits of proposal and to achieve wider Quality Audit (MLDP Policy PP1) aims.
• Six applications either incorrectly stated that removal complied with MLDP Policy EP7 or did not address the matter.
• Significantly less compensatory planting was secured compared to that that was lost. In four applications, no compensatory planting was
sought/conditioned due to the level of landscaping proposed as part of the development. 
6.7  Ancient Woodland 
In Scotland, Ancient Woodland (1a or 2a) is defined as land that is currently wooded and has been continually wooded, at least since 1750. These areas
therefore contribute significantly to the landscape but also play a key role in ecosystems and soil conditions. 
2021/22
• Between 2021 and 2022, one application impacted on Ancient Woodland. An area of approximately 0.03ha of 2a Ancient Woodland was lost to
accommodate a pedestrian track. Whilst no trees were removed and was for a relatively small area, the loss of woodland was not acknowledged in
the Report of Handling. 
2022/23
• Between 2022 and 2023, there were no applications that impacted on Ancient Woodland.
Page 235

Page 236

APPENDIX 1 
6.8  Woodland Creation 
Scottish Forestry administer and determine applications for woodland creation and Moray Council are a consultee. 
2021/22 
Location Urban or Rural Area (ha) Woodland & Forestry Strategy
Lower Corryhabbie (Dufftown) Rural 6.88 Preferred
Corryhabbie (Dufftown) Rural 86.52 Preferred and Potentially Sensitive
Redhill (Rothiemay) Rural 19.09 Preferred
Aswanley Bellyhack (Dufftown) Rural 50 Preferred
Little Tullich (Dufftown) Rural 4.79 Preferred
Morinsh (Glenlivet) Rural 10.33 Preferred 
Table 23: Woodland creation schemes consented in 2021-2022 
• 177.61ha of new woodland received consent between 2021 and 2022, compared to 49.73ha in 2020/21.
• All 6 applications were within rural areas and ‘Preferred’ areas as identified in the Moray Woodland and Forestry Strategy, with one area also
identified as ‘Potentially Sensitive’. 
2022/23 
Location Urban or Rural Area (ha) Woodland & Forestry Strategy
The Level Farm (Thomshill) Rural 7.3 Preferred
Easter Marchhead (Mosstowie) Rural 1.11 Preferred
Newtonbrae (Newmill) Rural 6.83 Preferred
Bellyhack Farm (Drummuir) Rural 17.10 Preferred 
Table 24: Woodland creation schemes consented in 2022-2023 
• Between 2022 and 2023, 32.34ha of new woodland received consent. 
Page 236

Page 237

APPENDIX 1
• All 4 applications were within rural areas and identified as ‘Preferred’ areas for woodland creation in the Moray Woodland and Forestry Strategy. 
6.9  Listed Building and Conservation Area Consents 
• Three applications for conservation area consent were submitted over the report period with two being approved and one refused.  The refusal
related to a storage building in the Cullen Seatown. It was refused on the grounds that there was no acceptable scheme of replacement which would
result in harm to the character and appearance of the conservation area.
• 101 Listed Building Consents (LBC) were submitted.  Two of these applications were refused.  One refusal related to an application for replacement
uPVC windows on a listed building.  The appeal for planning permission was upheld by the Moray Local Review Body (MLRB) with the DPEA allowing
the appeal and granting LBC.  
• Through the Scottish Government’s Place Based Investment Programme, Moray Council has been running a Windows Repair and Replacement grant
scheme to help homeowners install and repair traditional windows in their property if it is located within a conservation area.  This fund has proven
to be extremely popular and has helped to not only improve the character of individual properties but also the character of Moray’s conservation
areas.  In the first round of funding 8 properties across Moray were successful. 
6.10  Conclusion 
• Departures from MLDP Policy EP3 have been limited, however it is observed that the location of a development within the SLA and consideration of
the requirement of MLDP Policy EP3 is not always being referenced within Reports of Handling and reasons for refusal.
• Impacts on the landscape from large-scale onshore wind developments will remain a pressure.
• MLDP Policy EP5 has been largely effective in restricting new housing within ENVs. The loss of open space to accommodate development remains
low.
• The loss of prime agricultural land is largely restricted to sites that have been designated in the MLDP. 
• Potential impacts on peat are being adequately addressed through management plans, however it is observed that the presence of carbon-rich soils
and deep peat is not always being referenced within Reports of Handling.
• Whilst the level of tree and woodland removal associated with developments has largely been consistent since the adoption of MLDP 2020, the
introduction of NPF4 Policy 6 Forestry, woodland and trees has seen an increase in removal that does not comply with or is deemed an acceptable
departure to MLDP Policy EP7. In addition, significantly less compensatory planting is being secured compared to that that was lost.
• Impacts on Ancient Woodland remain extremely low.
• New woodland creation has been in line with the Moray Woodland and Forestry Strategy. 
Page 237

Page 238

APPENDIX 1
7. Safeguarding and Promoting Biodiversity 
7.1  Introduction
The current Moray Local Development Plan (MLDP2020) contains several polices that relate to biodiversity, either directly or indirectly. The direct planning
policies relate to placemaking, protected sites and biodiversity. However, a number of other policy areas contain elements that relate to wider biodiversity.
The MLDP has been adopted for a number of years and the relevant policies have been tested through the submission of planning applications.  
7.2  Changes since last monitoring report 
The significant change since the last monitoring report is the adoption of NPF4 in February 2023. This is now part of the Development Plan and there is
significant focus on the climate and nature crisis. The Spatial Principles, specifically Sustainable Places highlights the importance of the environment and
addressing a number of these issues. Furthermore, this strategy highlights a number of cross cutting policy themes that will require to be addressed in order
to improve biodiversity.
Therefore, the adoption of NPF4 has highlighted and further emphasised the need to tackle the nature crisis and deliver biodiversity improvements through
the planning system. The existing local development plan and the policy contained within NPF4 puts further emphasis on delivering and improving on the
current requirements in the development plan.
NPF4 has been adopted for a number of months and the policy considerations are filtering through planning decisions that are now being made. Although
there are not any direct contradictions between the biodiversity policy 's contained within NPF 4 and the local development plan there is clearly an
increased recognition and importance on the need to delivery improved biodiversity across planning. 
7.3  Themes from Development Plan
Biodiversity plans
The current local development plan requires that biodiversity plans are submitted for proposals of 10 or more houses under policy DP1 – 24 in total. The
plans submitted as part of the planning application are often a mix of a landscape plan and biodiversity plan combined with some suggestions for
biodiversity improvements. Most of the time this includes tree/shrub planting, bird boxes, bat boxes and hedgehog highways. However, it is common that
these plans are generic and not site specific, therefore it is not always clear if these suggestions are relevant to the specific site.
NPF4 states that all developments should protect and enhance biodiversity. This is not being fully addressed through planning applications at the current
time. 
Page 238

Page 239

APPENDIX 1
7.4  Protected sites/habitats
The existing planning policies within the LDP and within NPF4 provide sufficient protection for existing designated sites. This approach appears to be
working successfully was little impact on the existing protected sites. Appropriate assessment as required through HRA regulations has been undertaken on
a small number of occasions. 
7.5  Protected species
There has been considerable amount of planning applications that have considered protected species, however a fairly high percentage of these are in
relation to bat protection. A number of bat surveys have been submitted and this has resulted in mitigation through the licencing procedure or to establish
that there are no bats on site. However, there are some occasions that assessment is undertaken by the applicant and it is not clear if this is robust in terms
of determining planning  applications. Planning conditions and informatives are often attached to ensure any impact on bats in mitigated. 
There have been a small number of applications that have been refused due to protected species concerns although this was not the primary reason for
refusal.
7.6  Delivery, condition monitoring
As noted, the development plan has put an increased emphasis on biodiversity improvements on all scales of development. There are a number of
mechanisms to ensure biodiversity is improved through the planning system through policy requirements and guidance and there is an emphasis on delivery
of these improvements. 
7.7  Conclusion
It is acknowledged that the current local development plan provides opportunities for biodiversity improvements and also protection for habitats and
species. This is reinforced in the relevant policies of the NPF4, with an increased emphasis on biodiversity enhancement and associated benefits.   
The policies for protection of designated sites are working as intended, however there is scope to improve the mechanism for assessment of protected
species. The main issue is the lack of site specific biodiversity improvements across development sites; this is particularly prevalent in smaller housing
development sites. Going forward there should be an emphasis on proper biodiversity assessment of sites, resulting in specific plans that enhance
biodiversity and help link to the wider environment. 
Page 239

Page 240

APPENDIX 1
8. Delivering on Climate Change
8.1  Low and Zero Carbon Generating Technologies
National Planning Framework 4 (NPF4) requires new developments to be sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and adapt to current and future risks from climate change. Local guidance was introduced from 1 July 2023 and implementation of the policy will be
monitored in future reports.
8.2  Renewable Energy Proposals
2021/22
Planning App Location Type of Development Departure Reasons
21/0020/EIA Cabrach Wind farm (7 x 190m [46.2MW] and Battery
Energy Storage System (BESS) [3MW]
Adverse landscape and visual impacts,
including cumulative. 
Approved on appeal by DPEA on grounds
that proposal complied with policy.
21/00484/APP Drybridge Operational period of wind farm N/A
21/01044/APP Newmill Domestic solar array (21 panels - 6kW) and
11.1m wind turbine
N/A
21/01402/AMC
21/01561/AMC
Keith Onshore electrical transmission
infrastructure (inc. substation)
N/A
21/01777/APP Keith Synchronous compensators N/A
21/01948/APP Roseisle Air source heat pump N/A
21/01976/APP Forres Solar panels (23) N/A
Page 240

Page 241

APPENDIX 1
22/00067/S36 Keith BESS (300MW) N/A
22/00071/APP Kinloss Solar panels N/A
22/00339/APP Deskford Operational period of wind farm N/A
22/00555/APP Forres Biomass plant N/A 
Table 25: Renewable energy consents granted in 2021-2022
• 11 applications relating to renewable energy developments was consented between 2021 and 2022.
• One application was deemed a departure from MLDP Policy DP9 on the grounds that the proposal would result in adverse landscape and visual
impacts, including cumulative. Consent was granted on appeal by the DPEA who considered the proposal complied with policy.
2022/23
Planning App Location Type of Development Departure Reasons
22/01117/APP Fochabers Solar panels (19) N/A
22/00424/APP Keith Solar panels (317kW) N/A
22/00715/APP Keith BESS (49.9MW) N/A
22/01208/APP Dallas Operational period of wind farm N/A
22/01369/APP Findhorn Solar panels (10 – 3kW) N/A
22/01615/APP Forres Solar panels (115kW) N/A
22/01642/APP Forres Solar panels (110kW) N/A
22/00563/APP Deskford Wind farm (3 x 149.9m) Acceptable departure on basis that the
proposal was a reduced scheme of existing
consent which resulted in less landscape and
Page 241

Page 242

APPENDIX 1
visual impacts. Amendment also mitigated
some impacts on residential properties.
21/01805/APP Lochhill BESS (19.9MW) N/A
22/01798/APP Clochan Solar panels (14) N/A
22/01488/APP Keith BESS (49.9MW) N/A
22/01880/APP Glenfarclas Solar panels (129kW) N/A
23/00143/APP Lossiemouth Air source heat pumps N/A
23/00255/APP Forres Solar panels (16) N/A
23/00047/S36 Cabrach Wind farm (22 x 180/200m [145.2MW]) and
BESS [50MW]
Proposal results in significant landscape and
visual effects that are not either sufficiently
localised or mitigated. No objection raised to
ECU. Application still to be determined. 
Table 26: Renewable energy consents granted in 2022-2023
• Between 2022 and 2023, 14 applications for renewable energy developments were approved. A further application was considered by Moray
Council as a consultee.
• Two applications, both for wind farms, were considered to depart from policy. One was considered an acceptable departure on the grounds that the
development was a reduced scheme of an existing consent which resulted in less landscape and visual impacts. The second application was a
departure from NPF4 Policy 11; however, the Council raised no objection to the proposal which is determined by the ECU.
8.3 Electric Vehicle (EV) Charging Points and Secure Cycle Parking 
MLDP Policy PP3 Infrastructure and Services requires electric car charging points to be provide at all commercial and community parking facilities. Access to
charging points must be provided for residential properties. Where in-curtilage facilities cannot be provided to an individual property, access to communal
charging facilities must be made available. MLDP Policy DP1 Development Principles requires covered and secured facilities for cycle parking at all
flats/apartments, retail, community, education, health and employment centres.
Page 242

Page 243

APPENDIX 1 
• EV charging points are being provided largely in line with policy and Planning Policy Guidance (PPG). However, it is noted that there is an
inconsistency with how this is being delivered by developers with examples of development going beyond the minimum requirements.
• Covered cycle parking is also being provided in line with policy, although it can be difficult to clearly identify these on plans.
• One application (20/00795/APP) did not provide communal changing facilities for the flat/apartment development and instead provided individual
EV charging connections for each unit via dedicated garage parking. Secured cycle storage was also provided through the individual garages. 
8.4  Conclusion 
• Planning guidance was introduced from 1 July 2023 to support the implementation of NPF4 which requires new developments to be sited and
designed to minimise lifecycle greenhouse gas emissions as far as possible and adapt to current and future risks from climate change.
• There continues to be significant pressure from renewable energy developments in the form of large-scale onshore wind developments. An increase
in solar development has been experienced however these are limited to domestic scale. It is anticipated that demand for BESS will increase, and
this will be closely monitored in future reports.
• EV charging points and covered and secured cycle parking are being provided in line with policy requirements. 
Page 243

Page 244

APPENDIX 1
9. Rural Housing 
A new hierarchical policy approach was developed and introduced in the MLDP 2020. MLDP Policy DP4 Rural housing sought to restrict opportunities within
pressurised and sensitive areas and direct development to Rural Groupings, then re-use and replacement of traditional buildings and then lastly to the open
countryside. Siting and design criteria were set out in policy with the aim to integrate proposals better with the landscape, reduce the scale of buildings,
have more traditional form and proportions, reduce excessive glazing and use better materials. Monitoring for 2021-2022 and 2022-2023 does not include
applications which have extant/live consents, unless departing from policy, as the principle of a house has been established. 
9.1  New Rural Housing 
2021/22 
Rural Housing
Hierarchy
No. of Planning
Applications
No. of Approvals No. of
Refusals
No. of
Advertised
Departures
Departure Issues Summary of Refusal
Reasons
Pressurised and
Sensitive Area
4 0 4 4 Siting Adverse landscape and
visual impact
Rural Grouping 3 3 (5 units) 0 1 Design (addressed
through revised plans)
N/A
Re-use and
Replacement
5 5 0 2 1 x Policy DP4
1 x Design (addressed
through revised plans)
N/A
Area of Immediate
Pressure
7 3 (1 x APP, 2 x PPP) 4 1 Siting 1 x Access
1 x Siting, prejudicing
the special qualities of
an SLA and lack of
acceptable water
supply
1 x Siting and
permanent loss of
woodland
Page 244

Page 245

APPENDIX 1
1 x Cumulative build-
up 
Table 27: Summary of new rural housing applications in 2021-2022 
• Of the 19 new rural houses applications submitted between 2021 and 2022, four were in Pressurised and Sensitive Areas and all were refused in line
with MLDP Policy EP4. Three of these applications sought review by the MLRB, who dismissed the appeals and upheld the Appointed Officer’s
decision to refuse planning permission.
• Three applications, for five units, were submitted for houses in Rural Groupings. One application was advertised as a departure due to its design,
which was resolved through revised plans and no proposals for housing in Rural Groupings were refused.
• Four of the five applications for Re-use and Replacement were for the demolition of existing buildings due to their structural condition. Two
applications were advertised as departures from MLDP Policy DP4 and issues were resolved prior to receiving consent.
• There was a 57% refusal rate for houses within Areas of Immediate Pressure. This was predominately due to proposals not complying with siting
criteria, resulting in adverse landscape and visual impacts. 
• There were a number of applications with extant consents that applied to revise house designs and resulted in being advertised as a departure. Of
the 13 applications, nine were approved following the submission of revised plans, three were approved as acceptable departures from MLDP Policy
DP4 on the grounds of extant consents and/or character and one was refused and dismissed on review by the MLRB. 
2022/23 
Rural Housing
Hierarchy
No. of Planning
Applications
No. of
Approvals
No. of
Refusals
No. of
Advertised
Departures
Departure Issues Summary of Refusal
Reasons
Pressurised and
Sensitive Area
2 0 2 2 2 x Siting 2 x Developer obligation
payment, adverse
landscape and visual
impact and lack of tree
and bat surveys.
Rural Grouping 5 (11 units) 4 (10 units) 1 4  1 x Access
2 x Design (addressed
through revised plans)
Detrimental to the road
safety of road users
(approved by MLRB on
review)
Page 245

Page 246

APPENDIX 1
1 x Tree Survey and
design/materials (addressed
through revised plans) 
Re-use and
Replacement
10 (15 units) 10 (15 units) 0 2 1 x Design and structural
report
1 x Policy DP4
1 x Acceptable departure
due to exceptional building
suitable for conversion (not
advertised)
N/A
Area of Immediate
Pressure
4 1 (PPP) 3 1 Siting (concluded it
complied)
1 x Lack of enclosure
1 x Impact on landscape
character and lack of
enclosure
1 x Impact on landscape
character and
unacceptable build-up
(approved by MLRB on
review) 
Table 28: Summary of new rural housing applications in 2022-2023 
• Between August 2022 and July 2023, 21 applications were submitted for a combined 32 rural houses. 
• Two houses in Pressurised and Sensitive Areas were refused due to not complying with siting criteria, resulting in adverse landscape and visual
impacts.
• Of the five applications within Rural Groupings, four were advertised as departures on the grounds of access, design/materials and/or lack of tree
survey. One application was refused on the grounds of road safety and was subsequently approved on review by the MLRB.
• 13 of the 15 applications for Re-use and Replacement were for the demolition of existing buildings due to their structural condition. One application
was deemed an acceptable departure from MLDP Policy DP4 as the building, whilst not of traditional stone and slate form, was an exceptional
building suitable for conversion into residential use.
• There was a 75% refusal rate for applications in Areas of Immediate Pressure due to proposals not complying with siting criteria, resulting in impacts
on landscape characters and/or lacking enclosure. One application was subsequently approved on review by the MLRB.
Page 246

Page 247

APPENDIX 1
• There were three applications with extant consents that applied to revise house designs and resulted in being advertised as a departure. Following
the submission of amended plans, all were approved. 
9.2  Conclusion 
• The new hierarchical policy approach introduced in the MLDP 2020 has been successful in protecting pressurised areas from further inappropriate
development.
• All applications within Pressurised and Sensitive Areas have been refused and this position has been subsequently supported by the MLRB where
reviews were requested.
• Siting and design policy requirements are also driving better located houses within the landscape and design standards have also improved with
more traditional simple forms of homes being delivered on the ground. 
Page 247

Page 248

APPENDIX 1
10 Planning Appeals 
10.1  Introduction 
During the monitoring plan period a small number of planning appeals have been considered through the Local Review Body and DPEA process. The
following table provides a summary of the outcomes. 
Application Type Approved Refused Summary of reasons
Householder 3 9 • Approvals related to windows in a conservation area,
dormers on a rear elevation, and a retrospective boundary
fence.
• Refusals were mainly based on the amenity impacts of the
proposed developments.
Housing (local) 1 9 • Majority of refusals were for new single dwellings.  Reasons
were based on scale, design, and amenity.
Business (local) 2 2 • A hot food takeaway on an employment site and an
increase in child-minding provision within an existing
business were approved as acceptable departures.
• The two refusals were based on amenity impact of a new
takeaway and the location of a hair/beauty salon within a
residential garden 
Table 29: Table showing the breakdown of LRB decisions
In conclusion, it is recognised that the LRB did overturn a small number of delegated decisions.  However, these were based on small issues rather than the
principle of development. Furthermore, the majority of refusals within the local housing category considered a number of issues and demonstrates that the
policies are working as intended.
10.2  DPEA Decisions
• 8 cases were submitted to the DPEA for appeal consideration. 4 were rejected as there was no remit for determination and referred to the LRB. 
Page 248

Page 249

APPENDIX 1
• One case was dismissed and refused planning permission due to the lack of need for additional car parking to serve a restaurant, and therefore not
supported by the relevant planning policies. 
• Three cases were allowed, and planning permission was granted.
• A large scale mixed use development was approved in Buckie, on balance the reporter accepted that the proposal was satisfactory even though they
did not fully address key and fundamental issues raised by the Council in their decision.  Following the signing of the legal agreement the
development was approved. 
• A wind energy development was approved as the reporter determined that the visual impact of the development was acceptable and therefore met
the policy requirements. 
• A residential development was approved in Forres contrary to the development plan, however the reporter determined that the 100% affordable
housing proposal and the opportunity to redevelop a vacant site outweighed the stated conflict. 
Page 249

Page 250

Page 250

Page 251

APPENDIX 2
Settlement Actions 
A “traffic light” coding has been used to give an overall indication on progress across
residential, employment and opportunity designations in Moray: 
• Red – Site in danger of non-delivery. Officers will liaise with the developer /
landowner if there is no sign of the site coming forward;
• Amber – Site where there is little happening but no specific risk to non-
development; and
• Green – Site being actively progressed. 
Residential Designations 
Aberlour 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Tombain 20/00317/APP
18/01457/APP 
Consent for 5 units
issued in March 2022
and conditions in
process of being
discharged. 
R2 Speyview 23/00494/APP
21/00348/APP
18/01373/APP 
Application currently
under consideration. 
Site within the Housing
Mix project and
commitment under the
Strategic Housing
Investment Plan (SHIP).   
Alves 
Site Planning
Application
Progress
2021
Progress
2023
Action
LONG Alves
North   
No action at this time -
LONG designation. 
Archiestown 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 East End    Liaise with developer /
landowner.
R2 South
Lane   
Liaise with developer /
landowner.
R3 West End    Liaise with developer /
landowner.
Item 10.
Page 251

Page 252

APPENDIX 2
R4 South of
Viewmount   
Liaise with developer /
landowner. 
Buckie 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Burnbank 20/01691/APP
20/00954/APP
20/01233/APP  
Under construction.
R2 Archibald
Grove
18/01108/APP   Development completed.
R3 Rathburn
(N)   
Liaise with developer /
landowner.
R4 Rathburn
(S)   
Liaise with developer /
landowner.
R5 High
Street (E)   
Liaise with developer /
landowner.
R6 Barhill
Road (S)
16/00620/APP   Development completed.
R7 Land at
Muirton
21/01963/APP   Consent for 65 units
issued in June 2023.
R8 Land at
Barhill Road
21/01224/APP   Phase 1 approved
subject to S.75
agreement.
R9 Site at
Ardach
Health
Centre   
Liaise with developer /
landowner.
R10 Mill of
Buckie
19/01127/APP   Consent for 11 houses
issued in February 2021
and conditions in
process of being
discharged.
LONG1
South West
of Buckie   
No action at this time –
LONG designation.
MU High
Street (W)   
Liaise with developer /
landowner. 
Burghead 
Site Planning
Application
Progress
2021
Progress
2023
Action
Page 252

Page 253

APPENDIX 2
R1 North
Quay,
Harbour
18/00359/APP  Liaise with developer /
landowner - planning
permission lapsed in
September 2022.
R2 Clarkly
Hill   
Liaise with developer /
landowner.
LONG
Clarkly Hill 
No action at this time –
LONG designation. 
Craigellachie 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Edward
Avenue   
Remove site from
LDP2027 – protected
water supply passes
through site.
R2 Site of
Former
Brewery   
Remove site from
LDP2027 – required for
distillery operations.
R3 Brickfield 16/01559/APP
16/01558/APP  
Liaise with developer /
landowner. 
Cullen 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Seafield
Road   
Potential site within the
Housing Mix project.
Liaise with developer /
landowner. 
Cummingston 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Seaview
Road
21/00808/APP
20/01573/APP  
Extant consents in place
on site. 
Dallas 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Dallas
School West   
Liaise with developer /
landowner.
Page 253

Page 254

APPENDIX 2
R2 Dallas
School East   
Liaise with developer /
landowner.
R3 Former
Filling Station   
Liaise with developer /
landowner. 
Dufftown 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Hillside
Farm   
Masterplan being
developed for site.
Potential site within the
Housing Mix project with
commitment under the
Strategic Housing
Investment Plan (SHIP). 
Dyke 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 North
Darklass
Road
20/00610/APP
17/01233/AMC  
Development completed.
R2 South
Darklass
Road   
Liaise with developer /
landowner.
R3 Fir Park
Road 
22/01315/APP   Consent for 3 units
issued in May 2023. 
Elgin 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Bilbohall
North   
Liaise with developer /
landowner.
R2 Edgar
Road 
20/00905/APP   Consent for 194 units
issued in April 2022.
R3 Bilbohall
South
20/00905/APP   Consent for 194 units
issued in April 2022.
R4 South
West of Elgin
High School   
Liaise with developer /
landowner.
R5 Bilbohall
West 
Liaise with developer /
landowner.
Page 254

Page 255

APPENDIX 2
R6
Knockmasting
Wood   
Liaise with developer /
landowner.
R7 The Firs 20/00905/APP   Consent for 194 units
issued in April 2022.
R8 Alba
Place
19/01217/APP   Development
completed.
R9 Hamilton
Drive 
19/01614/APP  Under construction.
R10 Spynie
Hospital
North
19/00811/APP
19/00800/APP 
Development
completed.
R11
Findrassie /
Myreside Site
23/01385/APP
21/00961/AMC
20/00753/AMC
19/01085/APP 
Under construction.
R12
Lossiemouth
Road NE 
Liaise with developer /
landowner.
R13
Lesmurdie
Field
19/01510/APP  Consent for 70 units
issued in November
2022.
R14 Spynie
Hospital 
20/00781/APP
(Withdrawn)  
Liaise with developer /
landowner.
R15
Pinegrove 
Remove site from
LDP2027 – developer /
landowner no longer
looking to develop site.
R16
Barmuckity 
Liaise with developer /
landowner.
R17 Driving
Range 
15/02020/APP   Development
completed.
R18
Linkwood
Steading Site
19/00550/APP    Development
completed.
R19 Easter
Linkwood and
Linkwood
18/01209/APP
16/01244/APP  
Partially completed.
Remainder of site is
constrained due to
ownership.
R20
Glassgreen,
Elgin South 
21/00739/APP
21/00396/APP
21/00304/APP
21/00206/APP  
Under construction.
R21 Palmers
Cross   
Liaise with developer /
landowner.
LONG1 A/B
North East   
Liaise with developer /
landowner.
Page 255

Page 256

APPENDIX 2
LONG2 South 21/01163/APP
18/01209/APP 
Part of site released
under Policy DP2
triggers. 
Consent for 186 units
issued in July 2023 and
conditions in process of
being discharged. 
Findhorn 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1
Heathneuk
18/01518/APP
18/00429/APP  
Under construction.
R2 Duneland 19/01649/AMC
19/00320/PPP  
Development completed. 
Findochty 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Morven
Crescent   
Liaise with developer /
landowner.
R2 West of
Primary
School   
Liaise with developer /
landowner. 
Fochabers 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Ordiquish
Road
22/00385/APP
21/01487/APP
21/00933/APP  
Under construction.
R2 Ordiquish
Road West   
Liaise with developer /
landowner.
R3 East of
Duncan
Avenue
16/00308/APP   Development completed.
Page 256

Page 257

APPENDIX 2
R4 Ordiquish
Road East   
Liaise with developer /
landowner.
LONG
Ordiquish
Road East   
No action at this time –
LONG designation. 
Forres 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1
Knockomie 
19/00293/APP   Under construction.
R2 Ferrylea 19/00615/APP
18/01142/APP
18/00113/APP  
Under construction.
R3 Lochyhill 09/02364/APP
(lapsed)  
Masterplan being
developed for site.
Potential site within the
Housing Mix project.
R4
Mannachie
20/00927/APP
(Refused)  
Application pending.
R5
Balnageith   
Liaise with developer /
landowner.
R6 Dallas
Dhu   
Site within the Housing
Mix project and Council
working with landowner
to progress Phase 1
planning application.
R7 Pilmuir
Road West   
Liaise with developer /
landowner.
LONG1
Lochyhill   
No action at this time –
LONG designation.
Masterplan being
development for site. 
Garmouth 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 South of
Innes Road   
Liaise with developer /
landowner. 
Hopeman 
Page 257

Page 258

APPENDIX 2
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Manse
Road
20/00278/APP   Under construction.
R2 Forsyth
Street
16/01663/APP   Development completed. 
Keith 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Nelson
Terrace
19/00565/APP
17/01253/APP
17/00287/APP
14/02313/APP  
Development completed.
R2 Dunnyduff
Road 
Liaise with developer /
landowner.
R3 Balloch
Road   
Liaise with developer /
landowner.
R4 Banff
Road North
18/01497/APP   Under construction.
R5 Edindiach
Road West
19/01192/APP
19/00513/APP
17/01600/APP
14/01114/APP
13/01735/APP
07/01419/FUL  
Development completed.
R6 Former
Caravan Site,
Dunnyduff
Road 
Redesignate site in
LDP2027 – has
reopened as a
caravan/camping site.
R7 Denwell
Road 
Liaise with developer /
landowner.
R8 Edindiach
Road East 
Liaise with developer /
landowner.
LONG 1
Nursery Field 
Site released under
Policy DP2 triggers in
2022.
Liaise with developer /
landowner.
Page 258

Page 259

APPENDIX 2
MU Banff
Road South 
Liaise with developer /
landowner. 
Kinloss 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 West of
Seapark
House
17/00780/APP
15/01605/PPP 
Under construction.
R2 Findhorn
Road West 
23/00389/APP
20/01335/APP
17/01906/APP  
Under construction.
R3 Damhead 19/00260/PPP   Liaise with developer /
landowner. 
Lhanbryde 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 West of
St Andrews
Road
19/01080/APP  Consent for 77 units
issued in April 2021 and
conditions in process of
being discharged.
R2 Garmouth
Road 
23/00863/APP
20/01615/APP  
Consent for 32 units
issued in April 2022. 
Lossiemouth 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Sunbank /
Kinneddar
22/00161/APP
19/00100/APP 
Under construction
R2 Stotfield
Road 
Liaise with developer.
R3
Inchbroom
20/00265/APP
19/01178/APP 
Under construction. 
Mosstodloch 
Site Planning
Application
Progress
2021
Progress
2023
Action
Page 259

Page 260

APPENDIX 2
R1 Stynie
Road
19/00517/APP
18/01536/APP 
Development completed.
R2 Garmouth
Road   
Liaise with developer /
landowner.
MU LONG 1
South of A96 
Liaise with developer /
landowner. 
Newmill 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Isla Road    Liaise with developer /
landowner. Land subject
to long-term tenancy
agreements. 
Portgordon 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 West of
Reid Terrace   
Liaise with developer /
landowner. 
Portknockie 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Seabraes    Liaise with developer /
landowner. 
Rafford 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Brockloch    Finderne Development
Trust actively developing
community-led
affordable housing
project for site. 
Rothes 
Site Planning
Application
Progress
2021
Progress
2023
Action
Page 260

Page 261

APPENDIX 2
R1 Spey
Street   
Liaise with developer /
landowner.
R2 Green
Street   
Working farm on site.
Liaise with developer /
landowner. 
Rothiemay 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Castle
Terrace
14/01431/AMC   Liaise with developer /
landowner.
R2 Anderson
Drive   
Liaise with developer /
landowner.
R3
Deveronside
Road   
Liaise with developer /
landowner. 
Urquhart 
Site Planning
Application
Progress
2021
Progress
2023
Action
R1 Meft
Road
20/00120/APP   Consent for 10 units
issued in February 2022.
R2 Station
Road 
Liaise with landwoner
LONG1 Meft
Road   
No action at this time –
LONG designation. 
Employment and Opportunity Sites
Aberlour
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Fisherton    Fully developed /
occupied.
I2 Aberlour /
Glenlivet
Distillery
Area
19/01567/APP   Under construction.
I3 Mary
Avenue   
Fully developed /
occupied.
I4 Fisherton
Yard   
Fully developed /
occupied. Any vacancies
are actively managed.
Page 261

Page 262

APPENDIX 2
OPP1 Mary
Avenue   
Fully developed /
occupied. 
Buckie 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 March
Road (NW)   
Fully developed /
occupied.
I2 March
Road (NE)   
Fully developed /
occupied.
I3 Rathven
Industrial
Estate
20/01468/APP
17/00193/APP  
No action at this time.
Partially developed and
occupied. Site is being
actively marketed.
I4 Maltings 19/01026/APP   Part of site is occupied
by the Maltings and
remaining area subject
to various applications
relating to expansion of
maltings operations.
I5 The
Harbour Area   
Partially occupied with
vacancies actively
managed.
LONG 2
March Road   
No action at this time –
LONG designation.
OPP1
Highland
Yards
19/00416/APP
17/01468/APP  
Partially occupied by
Lidl, with remaining area
developed as residential.
OPP2
Blairdaff
Street   
Fully developed /
occupied.
OPP3 Barron
Street   
Partially occupied. 
Forms part of the Just
Transition masterplan.
OPP4 Bank
Street   
Liaise with developer /
landowner.
OPP5 The
Former
Jones
Shipyard   
Site has been cleared.
Liaise with developer /
landowner.
OPP6
Former
Grampian
Country Pork
19/01511/APP
19/00700/APP 
Under construction. 
Forms part of the Just
Transition masterplan.
Page 262

Page 263

APPENDIX 2
OPP7
Former
Millbank
Garage Site
08/01098/FUL   Under construction.
OPP8 Site at
March Road
West   
Liaise with developer /
landowner. 
Burghead 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Burghead
Maltings   
Fully developed /
occupied.
I2
Crematorium 
Fully developed /
occupied.
OPP1 West
Foreshore   
A comprehensive layout
for the whole of the site
has not deemed to be
feasible and another
approach is being
progressed with the
landowner. 
Craigellachie 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Distillery    Fully developed /
occupied. 
Cullen 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 South of
Cemetery 
Liaise with developer /
landowner.
OPP1
Blantyre
Street   
Liaise with developer /
landowner.
OPP2 Port
Long Road 
20/00520/APP
20/00178/APP
19/01406/APP
19/01247/APP
19/00703/APP  
Site under development.
Page 263

Page 264

APPENDIX 2 
Dufftown 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Balvenie
Street
19/00131/APP   Fully developed /
occupied.
I2 Mortlach
Distillery   
Fully developed /
occupied.
OPP1
Auction Mart,
Hill Street
14/00320/APP   Consent in place for 5
affordable units with
commitment under the
Strategic Housing
Investment Plan (SHIP).
OPP2 Hill
Street   
Liaise with developer /
landowner.
OPP3
Balvenie
Street   
Fully developed /
occupied. 
Elgin 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Linkwood
Industrial
Estate
18/01187/APP
17/00816/APP 
Fully developed /
occupied. Any vacancies
are actively managed.
I2 Chanonry
Industrial
Estate
21/00219/APP
20/01452/APP
19/01317/APP  
Fully developed /
occupied. Any vacancies
are actively managed.
I3 Moycroft
Industrial
Estate   
Fully developed /
occupied. Any vacancies
are actively managed.
I4 Tyock
Industrial
Estate
18/01484/APP
17/00018/APP 
Fully developed /
occupied. Any vacancies
are actively managed.
I5 Pinefield
Industrial
Estate
19/00340/APP
17/00952/APP
17/00785/APP  
Fully developed /
occupied. Any vacancies
are actively managed.
I6 Linkwood
East
22/00830/APP
20/00018/APP
18/01472/APP
18/01126/APP  
Liaise with developer /
landowner. 
Page 264

Page 265

APPENDIX 2
I7 Barmuckity 22/01278/APP
22/01084/APP
22/00983/APP
22/00607/APP
22/00519/APP
22/00410/APP
22/00239/APP
21/00448/APP
21/00207/APP  
Largely occupied or
under construction.
Remaining plots are
being actively marketed.
I8 Newfield 23/00994/APP   Forms part of Findrassie
Masterplan and is being
actively marketed. 
Application for battery
storage on part of the
site has been approved.
I9 Railway
Sidings /
Ashgrove
Road
22/01807/APP   Partially occupied.
I10 Edgar
Road   
Fully developed /
occupied.
I11
Johnstons
Woollen Mill
23/00527/APP   Fully developed /
occupied.
I12 Glen
Moray
Distillery,
Bruceland
Road
23/01121/APP
22/01938/APP  
Fully developed /
occupied.
I13 Linkwood
Distillery   
Fully developed /
occupied.
I14 Ashgrove
Road   
Fully developed /
occupied.
I15 Sandy
Road (The
Wards)
22/00189/APP   Fully developed /
occupied.
I16 Burnside
of Birnie   
Liaise with developer /
landowner.
LONG 3
Burnside of
Birnie   
No action at this time –
LONG designation.
MU1
Riverview 
Liaise with developer /
landowner.
Page 265

Page 266

APPENDIX 2
MU2
Lossiemouth
Road 
Forms part of Findrassie
Masterplan. Continue to
liaise with developer /
landowner. 
OPP1
Flemings
Sawmill /
Former
Morayshire
Tractors,
Linkwood
Road   
Forms part of Levelling
Up Fund project to
address constraints
affecting OPP1 and
OPP5.
OPP2 Hill
Street /
Ladyhill   
Liaise with developer /
landowner.
OPP3 Wards
Road   
Fully developed /
occupied.
OPP4
Ashgrove
Road
21/00719/APP
20/01757/APP
20/00721/APP  
Fully developed /
occupied.
OPP5
Auction Mart,
Linkwood
Road
19/01644/APP
17/00120/PPP
(Refused) 
Liaise with developer /
landowner.
OPP6
Grampian
Road 
22/00458/APP
22/00457/APP 
Sites being actively
marketed.
OPP7
Gordon
Macphail
Borough
Briggs   
Fully developed /
occupied.
OPP8 Lossie
Green 
Forms part of Elgin City
Centre Masterplan.
OPP9 Town
Hall 
Forms part of Elgin City
Centre Masterplan and
Moray Growth Deal. 
Design Team appointed
for redevelopment
project.
OPP10 Grant
Lodge   
Forms part of Elgin City
Centre Masterplan and
Moray Growth Deal. 
Page 266

Page 267

APPENDIX 2
OPP11
Lesser
Borough
Briggs 
23/00794/APP
20/00364/APP  
Fully developed /
occupied. 
Findhorn 
Site Planning
Application
Progress
2021
Progress
2023
Action
OPP1
Boatyard   
Liaise with developer /
landowner. 
Findochty 
Site Planning
Application
Progress
2021
Progress
2023
Action
OPP1 North
Beach
18/00700/APP    Under construction. 
Fochabers 
Site Planning
Application
Progress
2021
Progress
2023
Action
OPP1
Institution
Road   
Liaise with developer /
landowner.
OPP2
Lennox
Crescent   
Liaise with developer /
landowner. 
Forres 
Site Planning
Application
Progress
2021
Progress
2023
Action
BP1
Enterprise
Park 
23/01531/APP
21/01698/APP
20/00749/APP
20/00814/APP
20/01714/APP  
Liaise with developer /
landowner.
I1 Greshop  23/00795/APP
23/00625/APP
22/01615/APP
22/00784/APP
22/00643/APP  
Fully developed /
occupied. Any vacancies
are actively managed.
Page 267

Page 268

APPENDIX 2
I2 Waterford 23/01547/APP
23/01502/APP
23/01195/APP
22/00110/APP  
Fully developed /
occupied. Any vacancies
are actively managed.
I3
Benromach
Distillery
23/01104/APP   Fully developed.
I4 Easter
New Forres 
Viability concerns.
OPP1
Caroline
Street
20/01455/APP   Partially developed and
occupied. Main area
remains vacant. 
Consent for 48 units
issued in February 2022,
following appeal. 
Site recently sold to
adjacent business.
Liaise with developer /
landowner.
OPP2 Bus
Depot, North
Road
20/01226/APP   Fully developed.
OPP3
Castlehill Hall 
21/01598/APP   Liaise with developer /
landowner.
OPP4
Auction Hall,
Tytler Street   
Liaise with developer /
landowner.
OPP5
Edgehill
Road   
Liaise with developer /
landowner.
OPP6
Leanchoil
Hospital
22/00751/APP   Temporary change of
use to veterans’
activity/day centre.
OPP7
Whiterow
20/00185/APP  Partially developed. 
Continue to liaise with
developer / landowner
about wider site. 
Hopeman 
Site Planning
Application
Progress
2021
Progress
2023
Action
Page 268

Page 269

APPENDIX 2
I1 Forsyth
Street
22/00842/APP   Partially developed /
occupied. 
Consent for 5 business
and industrial units
issued in February 2023. 
Keith 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Westerton
Road North   
Fully developed /
occupied. Any vacancies
are actively managed.
I2 Westerton
Road South
23/00314/APP
(Refused)  
Partially developed with
vacancies being actively
marketed.
I3 Westerton
Road East
23/02043/APP
20/00877/APP
20/00237/APP  
Fully developed.
I4 Bridge
Street   
Mostly occupied by Keith
Builders Merchant.
I5 Edindiach
Road   
Fully developed.
I6 Newmill
Road   
Fully developed /
occupied. Any vacancies
are actively managed.
I7 Isla Bank
Mills
23/02018/APP
23/01934/APP  
Fully developed /
occupied. Any vacancies
are actively managed.
I8 Grain
Store,
Dufftown
Road
23/00478/APP   Fully developed.
I9 Burn of
Haughs
Bonded
Warehouses   
Fully developed.
I10 Railway
Land and
Blending
Works   
Fully developed.
I11
Westerton
Road East
Expansion 
23/00977/APP   Liaise with developer /
landowner.
Page 269

Page 270

APPENDIX 2
LONG 2
Westerton
Road 
No action at this time –
LONG designation.
OPP1 The
Tannery   
Site actively being
marketed.
OPP2
Former
Primary
School,
Church Road   
Fully developed /
occupied.
OPP3
Newmill
Road South   
Forms part of Just
Transition Masterplan. 
Kinloss 
Site Planning
Application
Progress
2021
Progress
2023
Action
OPP1
Kinloss
Home Farm 
Fully developed /
occupied.
OPP2 Land
at Former
Abbeylands
School 
Partially developed /
occupied. Liaise with
developer / landowner. 
Lossiemouth 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1
Coulardbank
Industrial
Estate
23/00461/APP   Fully developed /
occupied. Any vacancies
are actively managed.
I2 Shore
Street
23/00878/APP   Fully developed /
occupied. Any vacancies
are actively managed.
OPP1
Sunbank   
Liaise with developer /
landowner. 
Mosstodloch 
Site Planning
Application
Progress
2021
Progress
2023
Action
Page 270

Page 271

APPENDIX 2
I1 Garmouth
Road   
Fully developed /
occupied.
I2 North of
Baxter’s 
Reserved for expansion
of Baxters if required.
Liaise with developer /
landowner.
I3/LONG 2
West of
Mosstodloch 
Masterplan under
development. Continue
to liaise with developer /
landowner.
I4 Sawmill    Fully developed /
occupied.
I5 Baxter’s 22/00809/APP   Fully developed /
occupied.
MU LONG 1    Masterplan under
development. Continue
to liaise with developer /
landowner.
OPP1
Balnacoul 
Fully developed /
occupied. 
Newmill 
Site Planning
Application
Progress
2021
Progress
2023
Action
OPP1 The
Square
18/00047/APP   Partially developed. 
Portknockie 
Site Planning
Application
Progress
2021
Progress
2023
Action
OPP1 Patrol
Road
21/00916/APP   Construction appears to
have halted. Site being
actively marketed. 
Rothes 
Site Planning
Application
Progress
2021
Progress
2023
Action
I1 Back Burn    Being utilised for
storage. Liaise with
developer / landowner.
I2 The
Distilleries   
Fully developed /
occupied.
Page 271

Page 272

APPENDIX 2
I3 Reserve
Land Rear of
Dark Grains
Plant   
Fully developed /
occupied.
I4 Station
Yard   
Fully developed /
occupied.
OPP1 North
Street   
Liaise with developer /
landowner. 
Page 272