Planning and Regulatory Services Committee 
Tuesday, 16 December 2025 
NOTICE IS HEREBY GIVEN that a Meeting of the Planning and Regulatory Services
Committee is to be held at Council Chambers, Council Office, High Street, Elgin,
IV30 1BX on Tuesday, 16 December 2025 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Minute of meeting of 21 October 2025   5 - 34
4. Written Questions ** 
5. 25/01364/S37
Report by Executive Director Economy, Enterprise and Operations  
Consultation response to Scottish Minsters for a proposed 186km
overhead transmission line (400kV) and associated development
between Beauly and Peterhead  
35 -
102
6. Performance Report (Economic Growth and Development -
Planning) - Period to September 2025
Report by Executive Director Economy, Enterprise and Operations  
103 -
108
7. Moray Employment Land Audit 2025
Report by Executive Director Economy, Enterprise and Operations  
109 -
150
Page 1

Page 2

8. Moray Town Centre Health Check 2025
Report by Executive Director Economy, Enterprise and Operations  
151 -
180
9. Housing Land Audit 2025-26
Report by Executive Director Economy, Enterprise and Operations  
181 -
332 
Summary of Planning and Regulatory Services Committee
functions:
Town and Country Planning; Building Standards; Environmental Health;
Trading Standards; Weights & Measures, Tree Preservation Orders, and
Contaminated Land issues.     
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 3

Page 4

MORAY COUNCIL 
Planning and Regulatory Services Committee 
SEDERUNT 
Councillor David Gordon  (Chair)
Councillor Paul McBain  (Depute Chair)  
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Marc Macrae  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)  
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Planning and Regulatory Services Committee 
Tuesday, 21 October 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor Neil Cameron, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Divers, Councillor Amber Dunbar,
Councillor Jérémie Fernandes, Councillor David Gordon, Councillor Sandy Keith,
Councillor Marc Macrae, Councillor Paul McBain, Councillor Draeyk van der Horn,
Councillor Sonya Warren 
APOLOGIES 
Councillor John Cowe 
IN ATTENDANCE 
Head of Growth, Planning and Climate (Chief Planning Officer); N MacPherson,
Acting Development Management and Building Services Manager; R Smith, Principal
Planning Officer; D Anderson, Senior Engineer (Transportation); Service Manager
Legal Services; L Rowan, Committee Services Officer.   
1         Chair 
The meeting was chaired by Councillor David Gordon. 
2         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda. 
3         Minute of meeting of 12 August 2025 
The Minute of the meeting of the Planning and Regulatory Services Committee dated
12 August 2025 was submitted and approved. 
4         Written Questions 
The Committee noted that no written questions had been submitted.  
Item 3.
Page 5

Page 6

5         Planning Application 24/00617/EIA 
Erect four wind turbines three of which are up to 180m to blade tip height and one
up to 149.9m blade tip height, associated and ancillary infrastructure, includes
hardstanding areas for each turbine location, onsite access tracks, an electrical
substation and buried cables, temporary laydown areas and a temporary
construction compound on Land at Cairds Wood, Moray for EDPR.  
The meeting had before it a report by the Appointed Officer recommending that, for
reasons detailed in the report, planning permission be granted to erect four wind
turbines, three of which are up to 180m to blade tip height and one up to 149.9m
blade tip height, associated and ancillary infrastructure, including hardstanding
areas for each turbine location, onsite access tracks, an electrical substation and
buried cables, temporary laydown areas and a temporary construction compound on
Land at Cairds Wood, Moray for EDPR.  
The Committee noted that the application had been referred to Committee as the
Appointed Officer considers the matter raises matters of wider community interest
and/or planning significance by virtue of the scale or height of the turbines. 
Prior to consideration of the planning application, the Legal Adviser advised that
Members may have received an email from the objectors the previous afternoon
however this had been received out with the time period for late representations in
terms of the late representation policy. The Legal Adviser further advised that this had
been discussed with the Head of Growth, Planning and Climate who confirmed that
the issues raised were already addressed in the report and that Members should
disregard this email.  This was noted. 
During discussion, concern was raised in relation to whether the proposal would
affect the water supply to properties at Mains of Auchindachy Farmhouse, Keith,
AB55 5HT and Coldhome, Keith, AB55 5NX located to the north of the development
site and the Committee sought assurance that the water supply to these properties
would be protected. 
In response, Mr Smith, Principal Planning Officer advised that no development would
take place until a Private Water Supply Management Plan had been received, as
detailed in condition 32, however suggested that these specific properties be named
within the condition to provide assurance to home owners that their water supply
would not be affected.  Mr Smith, Principal Planning Officer further noted reference to
the Environmental Health Manager in conditions 32 and 40 and advised that this job
title had changed to Service Manager Community Protection and sought the
agreement of the Committee to update these conditions.  This was agreed. 
In relation to tree felling, several concerns were raised particularly in relation to the
associated compensatory planting measures noting that compensatory planting
would not fully mitigate against the loss of habitat.  It was also noted that there was
no confirmed location for the proposed 18.63 hectares of off-site compensatory
planting, uncertainty regarding the type of land to be used and no details provided on
the species mix, planting schedule, or whether the new woodland will be publicly
accessible. 
Page 6

Page 7

In response Mr Smith, Principal Planning Officer suggested that condition 33 could be
amended to stipulate that the Compensatory Planting Plan (CP) must not include or
affect land that is classified as prime agricultural land, must include provision for at
least 50% native broadleaf species, and include, where possible, provision for public
access to allow recreational use of the woodland and forest resource.  This was
agreed. 
The Head of Growth Planning and Climate (Chief Planning Officer) further suggested
the addition of an informative in relation to the provision of public access within the
compensatory planning site, where possible.  This was agreed. 
Thereafter, the Committee unanimously agreed to grant planning permission in
respect of Planning Application 24/00617/EIA subject to the following conditions and
reasons with amendments to conditions 32, 33 and 40 to reflect the following: 
• Condition 32
• Mains of Auchindachy Farmhouse, Keith, AB55 5HT and Coldhome,
Keith, AB55 5NX to be named to provide assurance to home owners
that their water supply would not be affected;
• Update job title of Environmental Health Manager to Service Manager
Community Protection;
• Condition 33 – to stipulate that the CP area must not include or affect land that
is classified as prime agricultural land, must include provision for at least 50%
native broadleaf species, and include, where possible, provision for public
access to allow recreational use of the woodland and forest resource; 
• Condition 40 – Update job title of Environmental Health Manager to Service
Manager Community Protection; and
• Additional informative in relation to the provision of public access within the
compensatory planning site, where possible. 
Conditions/Reasons 
Length of planning permission 
1. Unless otherwise agreed in writing with the planning authority, the permission
hereby granted shall endure for a period no longer than 40 years from the date of
final commissioning, after which the development shall cease to export electricity
to the national grid and shall be decommissioned in accordance with the details
otherwise approved elsewhere within this planning permission. The date of final
commissioning shall be as informed to the planning authority in writing or 18
months from the date of this planning permission, whichever is the sooner. 
Reason: To avoid uncertainty and ensure that the permission is implemented
within a reasonable period, and to allow the planning authority to monitor
compliance with the other conditions imposed. 
Expiry of planning permission 
2. This planning permission will lapse on the expiration of a period of five years from
the date of this planning permission, unless the development has been started
within that period. 
Page 7

Page 8

Reason: To apply a reasonable time limit for the implementation of the planning
permission. 
Turbine details 
3. No turbines shall be erected on the site until the definitive type/model of all
turbines including details of the hub height, blade length and blade tip height,
external finishes and colour, together with any further assessments as may be
required in order to demonstrate to the reasonable satisfaction of the planning
authority that the turbines conform to the impacts of the candidate turbine
assessed in the EIA report, have been submitted to and approved in writing by the
planning authority. The approved details shall be implemented. Furthermore:- 
a) all wind turbine blades shall rotate in the same direction; 
b)  no part of the development shall display any name, logo, sign or other
advertisement other than as specified in the application, unless approved in
advance in writing by the planning authority or if required by law; and 
c)  the wind turbines shall be constructed and operated in accordance with the
approved details and shall be maintained in the approved colour, free from
external rust, staining or discolouration, until such time as the development
is decommissioned. 
Reason: To ensure that the environmental impacts of the turbines forming part of
the development conform to the impacts of the candidate turbine assessed in the
EIA report and in the interests of the visual amenity of the area. 
Substation 
4. No construction of the substation shall commence until final details of the
external appearance, dimensions, surface materials and boundary treatment of
the substation including the means of foul water disposal and water supply have
been submitted to and approved in writing by the planning authority. The sub-
station (including associated infrastructure) shall thereafter be constructed in
accordance with the approved details. 
Reason: To ensure that the environmental impacts of the sub-station forming part
of the development conform to the impacts assessed in the EIA report and in the
interests of visual amenity. 
Transportation Matters 
5. Prior to commencement of deliveries to site, the proposed route for any abnormal  
loads on the trunk road network must be submitted to and approved by the
Planning Authority, in consultation with Transport Scotland as the trunk roads
authority. 
Reason: To minimise interference and maintain the safety and free flow of traffic
on the Trunk Road as a result of the traffic moving to and from the development. 
6. Prior to the movement of any abnormal load, any accommodation measures
required on the trunk road network, including the removal of street furniture,
junction widening and traffic management must be approved and implemented to
the satisfaction of the Planning Authority, in consultation with Transport Scotland. 
Page 8

Page 9

Reason: To minimise interference and maintain the safety and free flow of traffic
on the Trunk Road as a result of the traffic moving to and from the development. 
7. Prior to the movement of any components and/or construction materials, any
additional signing or temporary traffic control measures deemed necessary on the
trunk road network due to the size or length of any loads being transported must
be undertaken by a recognised QA traffic management consultant, to be approved
by Transport Scotland. 
Reason: To ensure that the transportation of any components/materials will not
have any detrimental effect on the road and structures along the route. 
8. Prior to commencement of any abnormal deliveries to site, any Construction
Traffic Management Plan shall include swept path analysis to ensure these can be
transported along the trunk road network safely. The complete report shall detail
any accommodation measures required including the temporary removal of street
furniture, junction widening, traffic management etc. and show that the
transportation will not have any detrimental effect on structures within the route
path. 
Reason: To minimise interference and maintain the safety and free flow of traffic
on the Trunk Road as a result of the traffic moving to and from the development. 
9. No development shall commence until: 
i. a detailed drawing (scale 1:500 or 1:1000 which shall also include details to
demonstrate control of the land through evidence of ownership or provision
of third party agreement.) showing the visibility splay 4.5 metres by 215
metres at both directions onto the B9115 Drummuir - Turfhillock - Newtack
Road (including the 215m forward sightline for the vehicles travelling
westbound and assessment of vertical road alignment) with all boundaries
set back to a position behind the required visibility splay, and a schedule of
maintenance for the splay area has been submitted to and approved in
writing by the Council, as Planning Authority in consultation with the Roads
Authority; and 
ii. thereafter the visibility splay shall be provided in accordance with the
approved drawing prior to any works commencing (except for those works
associated with the provision of the visibility splay); and 
iii. thereafter the visibility splay shall be maintained at all times free from any
obstruction exceeding 0.6 metres above the level of the carriageway in
accordance with the agreed schedule of maintenance. 
Reason: To enable drivers of vehicles leaving/entering the site to have a clear view
over a length of road sufficient to allow safe exit/entry, in the interests of road
safety for the proposed development and other road users. 
10. No development shall commence until: 
Page 9

Page 10

i. a detailed drawing (scale 1:500 or 1:1000 which shall also include details to
demonstrate control of the land through evidence of ownership or provision
of third-party agreement.) showing the visibility splay 4.5 metres by 90
metres at both directions onto the Blackhillock Road (U43H) with all
boundaries set back to a position behind the required visibility splay, and a
schedule of maintenance for the splay area has been submitted to and
approved in writing by the Council, as Planning Authority in consultation with
the Roads Authority; and 
ii. thereafter the visibility splay shall be provided in accordance with the
approved drawing prior to any works commencing (except for those works
associated with the provision of the visibility splay); and 
iii. thereafter the visibility splay shall be maintained at all times free from any
obstruction exceeding 0.6 metres above the level of the carriageway in
accordance with the agreed schedule of maintenance. 
Reason: To enable drivers of vehicles leaving/entering the site to have a clear view
over a length of road sufficient to allow safe exit/entry, in the interests of road
safety for the proposed development and other road users. 
11. No development shall commence until a Construction Traffic Management Plan
(CTMP) has been submitted to an agreed in writing by the Planning Authority in
consultation with the Council Roads Authority and Transport Scotland. Thereafter
the development shall be carried out in accordance with the agreed CTMP at all
times. For the avoidance of doubt the CTMP shall include as a minimum the
following information: 
• duration of works; 
• construction programme; 
• number of vehicle movements on each construction traffic route by
daily/weekly/monthly frequency broken down by vehicle type/size and
expected construction traffic generation during the peak construction
periods are required as opposed to the average traffic generation over a
period of time (i.e. materials, plant, staff, components); 
• schedule for delivery of materials and plant; 
• parking provision, loading and unloading areas for construction traffic; 
• full details of temporary arrangements to safeguard pedestrian movements
during the construction period; 
• full details of any temporary access;
• measures to be put in place to prevent material being deposited on the
public road; 
• traffic management measures to be put in place during works including any
specific instructions to drivers; 
• full details of construction traffic routes from/to the site, including any
proposals for temporary haul routes and routes to be used for the disposal
of any materials from the site; (The section of the section of B9115 from the
site to Drummuir and Rosehall Road (U43aH) must not be used by HGV
construction traffic associated with the proposed development); and 
• a programme of monitoring for all routes identified within the CTMP during
construction will be required. 
Reason: To ensure an acceptable form of development in terms of the
arrangements to manage traffic during construction works at the site.
Page 10

Page 11

12. No development shall commence until evidence of a satisfactory Wear and Tear
Agreement has been submitted to and agreed in writing by the Planning Authority
in consultation with the Roads Authority. The scope of the Wear and Tear
Agreement shall be agreed with the Planning Authority in consultation with the
Roads Authority and shall include a condition survey of the network undertaken
jointly by the developer and a representative from the Council. The survey shall
include the full extent of the agreed construction traffic route(s) (within Moray)
between the site and the ‘A’ class road network. In addition, the wear and tear
agreement shall also include condition surveys of all roads identified as
‘unsuitable’ which must be agreed with the Planning Authority in consultation with
the Roads Authority as a part of condition ‘11’ above. 
Reason: To mitigate the potential risks from damage to the public road occurring
during the construction phase of the development. 
13. No development shall commence until evidence of a financial guarantee or bond
or suitable equivalent and a Wear and Tear Agreement have been put in place to
ensure the repair of the public road serving the site in the event that the road is not
maintained in a safe condition during the construction phase of the development
and to restore the road to its pre-development condition within 1 year of the
development becoming operational has been submitted to and agreed in writing
with the Council, as Planning Authority. For the avoidance of doubt the agreement
shall cover the length of the B9115 from A96 to site access and Blackhillock Road
(U43H) from A96 to site access as a minimum and all roads identified as
‘unsuitable’ as in condition ‘11’ above. 
Reason: To mitigate the potential risks from damage to the public road occurring
during the construction phase of the development. 
14. Prior to the commencement of any part of the development, the following must be
submitted for approval by the Planning Authority: 
a) Detailed proposals for undertaking trial runs and also delivery of abnormal
indivisible loads, must be submitted for approval by the Planning Authority in
consultation with Roads Authority. Details must include, measures
proposed to protect the public road and structures, traffic management
(including temporary waiting restrictions), vehicle holding areas and non-
vehicular management during deliveries, time restrictions for deliveries i.e.
out with school arrival and departure times.
b) Detailed plans (1:200 min) of all works to accommodate the proposed
abnormal indivisible deliveries must be submitted and approved by the
Planning Authority in consultation with the Roads Authority. 
c) Details of an Assessment of the adequacy of the existing passing places
along the B9115 Drummuir - Turfhillock - Newtack Road and Blackhillock
Road (U43H) Road for the increased HGV construction traffic, including the
distances between the existing passing places. The assessment should
identify the improvements required for the existing passing places to provide
a passing width of 6m over a 20m length with 10 metre tapers at each end.
Third party land may be required to meet the required standard. Adjacent
Passing places should be intervisible and have a maximum spacing not
exceeding 150m. 
Page 11

Page 12

d) Detailed plans (1:200 min) of all temporary and permanent works proposed
to the public road (based on the details of part ‘b’ and ‘c’ above of this
condition) must be submitted and approved by the Planning Authority in
consultation with the Roads Authority.
e) Detailed plans (1:200 min) of all forestry clearance works related to the
proposed wind farm development project along with the full details of the
routes used for the timber traffic and associated enabling works must be
submitted and approved by the Planning Authority in consultation with the
Roads Authority. 
f) Details of an assessment of the structural integrity of the road pavement to
demonstrate that the selected roads are capable of sustaining the level of
development traffic generated during construction. The assessment should
identify any strengthening and/or improvements where required for the
existing road pavement to accommodate the anticipated construction
traffic. 
g) Details of the proposals to promote a short-term Road Traffic Regulation
Order allowing the introduction of a One - Way system for the triangular area
incorporating the B9115 / C75H (Marypark Edintore Road) 
h) Notwithstanding the details submitted which are not accepted, classified
traffic surveys over a 4-week period will be required for a neutral period out-
with school/public holidays prior to development commencing. The counts
will be required at locations to be agreed with Moray Council Transportation
(Traffic) on the B9115 Drummuir - Turfhillock - Newtack Road and
Blackhillock Road (U43H).
i) Details of proposed CCTV camera system which will be implemented at the
site entrance (B9115) to monitor adherence to the designated construction
route. 
Thereafter, the development shall be completed in accordance with the approved
details. 
Reason: To ensure an acceptable development in road safety terms through the
provision of details currently lacking from the submission. 
15. Prior to the commencement of construction and deliveries; 
a) The proposed new vehicular access on to the B9115 shall be developed to
accommodate vehicle swept paths and have a maximum gradient of 1:20
measured for the first 5.0m from the edge of the public carriageway. The first
15 m of the access track, measured from the edge of the public road, shall
be constructed to the Moray Council specification and surfaced with
bituminous macadam. The additional temporary widening area should only
use during the AILs deliveries and should be protected by an agreed barrier
system to avoid entering other vehicles and to protect the edge of the road. 
b) A 35 metre length of hot rolled asphalt shall be provided on the B9115 (10
metres to the left (west) and 25 metres to the right (east) of the centreline of
the new junction) and the B9115 should be widened to at least 6 metres over
the length of the hot rolled asphalt section of the road at the new access
junction including appropriate tapers, so that the delivery/construction
vehicles do not have to overrun the verges when negotiating at the access
junction. 
Page 12

Page 13

c) All suspensive works approved through condition (9 to 14 inclusive), must be
completed in accordance with the approved plans. Any works undertaken
are to be permanent for the duration of the operation of the development
unless otherwise agreed in writing with the Roads Authority. 
Thereafter, the development shall be completed in accordance with the approved
details. 
Reason: The provision of details currently lacking and in order to ensure that
acceptable infrastructure is provided on the route to/from the development in the
interests of road safety. 
16. Prior to any abnormal indivisible load being delivered to the site:  
a) All suspensive works approved through conditions (9 to 15 a) and b)
inclusive), must be completed in accordance with the approved plans. Any
works undertaken are to be permanent for the duration of the operation of
the development unless otherwise agreed in writing with the Roads
Authority. 
b) Abnormal load trial run(s) must be undertaken after all mitigation works have
been completed to confirm the works are acceptable and to identify any
other restrictions not previously addressed and the frequency and location
of abnormal load passing places/oncoming vehicle holding areas required.
Representatives from Moray Council Transportation (Traffic), and Police
Scotland must be invited to the trial run. 
Thereafter, the development shall be completed in accordance with the approved
details. 
Reason: To ensure that acceptable infrastructure is provided on the route to/from
the development in the interests of road safety. 
17. No water shall be permitted to drain or loose material be carried onto the public  
footway/carriageway. 
Reason: To ensure the safety and free flow of traffic on the public road and
access to the site by minimising the road safety impact from extraneous material
and surface water in the vicinity of the new access. 
18. Any existing ditch, watercourse or drain under the site access shall be piped using
a suitable diameter of pipe, agreed with the Roads Maintenance Manager (300mm
minimum). The pipe shall be laid to a self-cleansing gradient and connected to an
outfall. 
Reason: To ensure the construction of an acceptable access in the interests of
road safety and effective drainage infrastructure. 
19. Prior to the commencement of construction and deliveries, a finalised Site-
Specific Route Access Report and Construction Traffic Management Plan in
respect of construction traffic that would affect the Aberdeenshire Road networks
shall be submitted to and agreed by Moray Council, in consultation with the
Aberdeenshire Council Structures Section. 
Page 13

Page 14

Thereafter, the development shall be completed in accordance with the approved
details.   
Reason: To ensure an acceptable development in road safety terms on the
Aberdeenshire Road network through the provision of details that are currently
lacking from the submission. 
Archaeology 
20. No works in connection with the development hereby approved shall commence
unless a site protection plan has been submitted to and approved in writing by the
planning authority. Site protection measures shall be shown on a layout plan
accompanied by descriptive text and shall include: 
a)  The location of the historic environment features to be protected during
construction works; and
b)  The position and details of the warning signs and protective fencing to be
erected. 
No works in connection with the development hereby approved shall commence
unless the site protection measures have been implemented in full in accordance
with the approved details. All protective fencing and warning signs shall be
retained during the construction period in accordance with the approved details
and no works shall take place at any time within the protected areas. 
Reason: In the interests of protecting known features of the historic environment. 
21. No works in connection with the development hereby approved shall commence
unless an archaeological written scheme of investigation (WSI) has been
submitted to and approved in writing by the planning authority and a programme
of archaeological works has been carried out in accordance with the approved
WSI. The WSI shall include details of how the recording and recovery of
archaeological resources found within the application site shall be undertaken,
and how any updates, if required, to the written scheme of investigation will be
provided throughout the implementation of the programme of archaeological
works. Should the archaeological works reveal the need for post excavation
analysis the development hereby approved shall not be brought into use unless a
post-excavation research design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and
approved in writing by the planning authority. The PERD shall be carried out in
complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. 
Scottish Gas Network 
22. The development shall be implemented in accordance with the notification and
mitigation requirements agreed between Scotland Gas Networks and the
Developer, as contained within the revised Scotland Gas Network consultation
response letter dated 17 December 2024. 
Reason: To allow for alternating current (AC) interference issues to be
investigated if necessary and mitigated to protect SGN infrastructure. 
Page 14

Page 15

Scottish & Southern Electricity Networks 
23. No development shall commence until a finalised Construction Traffic
Management Plan (CTMP) has been submitted to and approved in writing by the
Council, as Planning Authority in consultation with Scottish & Southern Electricity
Networks Transmission. Thereafter, the development shall be implemented in
accordance with these approved details. 
Reason: To ensure that construction traffic associated with the development is
effectively managed and will not adversely impact the access road which is
required by SSEN Transmission to access the Blackhillock substation at all times. 
24. No development shall commence until a Scheme detailing interference mitigation
works has been submitted to and approved in writing by the Council, as Planning
Authority in consultation with Scottish & Southern Electricity Networks (SSEN).
This Scheme shall encompass all the agreements contained within the mitigation
agreement letter, signed by both SSEN and the Developer, dated 11 July 2025,
submitted to the Council by SSEN. Thereafter, the approved Scheme of Mitigation
shall be implemented in accordance with these approved details. 
Reason: To ensure that the identified mitigation is carried out in accordance with
the approved details to protect Scottish & Southern Electricity Networks (SSEN)
operational telecoms asset. 
Aviation Safety 
25. No wind turbine shall be erected unless and until an Air Traffic Control Radar
Mitigation Scheme to address the impact of the wind turbines upon air safety has
been submitted to and approved in writing by Moray Council in conjunction with
the Ministry of Defence (MOD). 
The Air Traffic Control Radar Mitigation Scheme (ATCRMS) is a scheme designed
to mitigate the impact of the development upon the operation of the Air Traffic
Control Radar System(s) used by RAF Lossiemouth (“the Radar”) and the air traffic
control operations of the MOD which are reliant upon the Radar. The ATCRMS
shall set out the appropriate measures to be implemented to mitigate the impact
of the development on the Radar and shall be in place for the lifetime of the
development provided the Radar remains in operation. 
The development shall be implemented strictly in accordance with the details set
out in the approved ATCRMS. 
Reason: To maintain aviation safety. 
26. No wind turbine erected as part of this development shall be permitted to rotate
its rotor blades about its horizontal axis, other than for the purpose of testing
radar mitigation for this development for specific periods as defined in the
approved Air Traffic Control Radar Mitigation Scheme (ATCRMS) or otherwise
arranged in accordance with provisions contained in the approved ATCRMS, until: 
Page 15

Page 16

a) those mitigation measures required to be implemented prior to any wind
turbine being permitted to rotate its rotor blades about its horizontal axis as
set out in the approved ATCRMS have been implemented; 
b) any performance criteria specified in the approved ATCRMS and which the
approved ATCRMS requires to have been satisfied prior to any wind turbine
being permitted to rotate its rotor blades about its horizontal axis have been
satisfied and Moray Council, in conjunction with the Ministry of Defence,
have confirmed this in writing. 
Thereafter the development shall be operated strictly in accordance with the
details set out in the approved ATCRMS for the lifetime of the development,
provided the Radar remains in operation. 
Reason: To maintain aviation safety. 
27. Prior to commencing construction of any wind turbine generators, anemometry
masts, or deploying any construction equipment or temporal structure(s) 50
metres or more in height (above ground level) the undertaker must submit an
aviation lighting scheme for the approval of Moray Council in conjunction with the
Civil Aviation Authority and the Ministry of Defence defining how the development
will be lit throughout its life to maintain civil and military aviation safety
requirements as required under the Air Navigation Order 2016 and, or, determined
necessary for aviation safety by the Ministry of Defence and, or, as directed by the
Civil Aviation Authority. 
This should set out: 
a)  Details of any construction equipment and temporal structures with a total
height of 50m or greater (above ground level) that will be deployed during the
construction of wind turbine generators and details of any aviation warning
lighting that they will be fitted with. 
b)  the locations and heights of all wind turbine generators in the development
identifying those that will be fitted with aviation warning lighting identifying
the position of the lights on the wind turbine generators; the type(s) of lights
that will be fitted and the performance specification(s) of the lighting type(s)
to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved
aviation lighting scheme. The lighting installed will remain operational for the
lifetime of the development. 
Reason: To maintain aviation safety. 
28. The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information: 
a)  the date of the commencement of the erection of wind turbine generators
and anemometer masts; 
b) the maximum height of any construction equipment to be used in the
erection of the wind turbines; 
c)  the date any wind turbine generators are brought into use; 
d)  the latitude and longitude and maximum heights of each wind turbine
generator, and any anemometer mast(s). 
Page 16

Page 17

The Ministry of Defence must be notified of any changes to the information
supplied in accordance with these requirements and of the completion of the
construction of the development. 
Reason: To maintain aviation safety. 
29. No turbine shall be erected until a Primary Radar Mitigation Scheme (PRMS)
agreed with the Operator has been submitted to and approved in writing by the
planning authority in order to mitigate the impact of the development on the
Primary Radar Installation at Perwinnes and the associated air traffic
management operations. 
Reason: To maintain aviation safety. 
30. No turbine shall be erected unless and until the approved Primary Radar
Mitigation Scheme has been implemented and the development shall thereafter
be operated fully in accordance with such an approved Scheme.  
Reason: To maintain aviation safety. 
Reduced lighting scheme 
31. Unless otherwise agreed in writing with the planning authority, prior to
development commencing, a report detailing investigations into a reduced
lighting scheme including an assessment of the potential for installation of an
Aircraft Detection Lighting System (“ADLS”), with a statement setting out current
and anticipated regulatory environment in relation to ADLS (or evidence of why
this cannot be achieved), must be submitted to and approved in writing by the
planning authority, in consultation with the Ministry of Defence and the Civil
Aviation Authority. Thereafter the lighting scheme must be implemented in
accordance with the approved scheme. 
Reason: To ensure that only the minimum necessary lighting requirement are
developed and to allow for further consideration of the lighting proposals. 
Private Water Supply Management Plan 
32.    No development shall commence until a Private Water Supply Management Plan
prepared by a suitably qualified professional has been submitted to and agreed by
the Planning Authority. The plan shall include the mitigation identified in the EIA
chapter 9 and the addition of Water Testing records as detailed in correspondence
dated 13.09.24 from Greencat Renewables author Ciara Morton. This shall
include the protection of supplies to the properties known as Mains of
Auchindachy Farmhouse, Keith, AB55 5HT and Coldhome, Keith, AB55 5NX
located to the north of the development site, in addition to those already identified
in the EIA and additional correspondence. In the event that the wholesomeness or
adequacy of any private water supply becomes affected by construction activity,
all users of such supplies and Service Manager Community Protection of Moray
Council must be contacted to discuss remediation measures as a priority.
Thereafter repair of any affected private water supply must be carried be to the
satisfaction of the Council as Planning Authority in consultation with the Service
Page 17

Page 18

Manager Community Protection. The Council shall be the final arbiter whether any
supply has been affected by this development. 
Reason: In order to safeguard the and maintain the wholesome provision of any
private water supply affected by the development. 
Forestry 
33.    Prior to the commencement of the development or any tree felling on the site, a
Compensatory Planting Plan (CP) detailing the provision of 18.63ha of tree
planting shall be submitted to and approved in writing by the Council, as Planning
Authority in consultation with Scottish Forestry. The CP must provide full details
of the proposed planting, including its maintenance over the entire lifespan of the
development and include the following information: 
a) The CP Plan must be prepared and delivered by qualified and experienced
professionals, such as a chartered forester, responsible for both felling and
compensatory planting.
b) The 18.63 ha CP area must be clearly mapped and described and located in
Moray.
c) Any necessary statutory consents for implementing the CP must be
identified and provided.
d) A UKFS v5 compliant silvicultural plan must be submitted with maps,
covering site preparation, planting method, species selection with proven
site suitability and provenance, stocking density, maintenance, and long-
term protection.
e) CP must be completed within five years of woodland removal or two years of
development completion, whichever is earlier. A maintenance plan and
timeline must also be included, with establishment within the enforcement
period.
f) A qualified professional (e.g. chartered forester) must inspect the CP at
Years 1, 5, and 10, report to the Planning Authority, and confirm the
woodland is properly established and maintained.
g) Restocking must occur within two years of woodland removal or associated
development completion. Extensions are only permitted if justified by the
Hylobius Decision Support System, but never beyond five years.
h) The CP area must not include or affect land that is classified as prime
agricultural land.
i) The CP must include provision for at least 50% native broadleaf species.
j) The CP should include, where possible, provision for public access to allow
recreational use of the woodland and forest resource.   
Reason: To mitigate the effects of the development on woodland and ensure
provision of satisfactory compensatory planting 
34.  Prior to the commencement of the development or any tree felling on the site, a
revised felling and restocking strategy shall be submitted to and approved in
writing by the Council, as Planning Authority in consultation with Scottish
Forestry. The revised strategy must include the following information: 
a) Improvements shall be made to the design of the forestry on the
development site with this focused on external margins which are currently
Page 18

Page 19

angular with a poor fit to landform. These shall incorporate the addition of
broadleaved planting to soften abrupt edges. 
b) The proportion of broadleaves within the forest shall be increased to at least
match the hectarage in the baseline Forest Plan. 
c) Details of efforts made by the developer to include additional broadleaved
planting on adjoining farmland, if possible and in agreement with
appropriate parties, with this connecting to new broadleaved planting within
the productive forest to enhance biodiversity in line with the requirements of
NPF4 Policy 3 Biodiversity (which aims to deliver positive effects from
development) and Policy 11 (particularly ix and xii which relates to mitigation
and the quality of restoration plans) and also to improve wider landscape
character.     
Reason: To mitigate the effects of the development on wider landscape
character, ensure provision of a revised satisfactory felling and restocking plan
and enhance biodiversity. 
Mitigation 
35.   No development shall commence until a Schedule of Mitigation has been
submitted to and approved in writing by the Planning Authority. This Schedule
shall encompass a list of all mitigation measures from the EIA Report, any other
commitments made by the applicant and all relevant mitigation secured by
conditions attached to this permission with defined timescales for
implementation of each mitigation measure. 
Thereafter, the approved Schedule of Mitigation shall be implemented in full
unless otherwise approved in writing by the Planning Authority. 
Reason: To ensure that the identified mitigation through the EIA Report is carried
out in accordance with the approved details. 
Environmental Clerk of Works 
36.    No development shall commence until the terms of the appointment of a suitably
qualified, experienced, and independent Ecological Clerk of Works (“ECoW”) by
the applicant have been submitted to, and approved in writing by, the Planning
Authority. The terms of appointment shall:
i)  impose a duty to monitor compliance with the ecological and hydrological
commitments provided in the mitigation identified in the EIA Report and the
Schedule of Mitigation approved under condition 35; any micro-siting
approved under condition 41, the Construction Environmental Management
Plan approved under condition 40; the habitat management plan approved
under condition 38; and any species protection plans approved under
condition 40;
ii)  require the ECoW to report to the developer's nominated construction
project manager and the planning authority any incidences of
noncompliance with the mitigation measures referred to at i) above at the
earliest practical opportunity and no later than 5 working days following the
incidence of non-compliance;
Page 19

Page 20

iii)   require the ECoW to direct the micro-siting and placement of the turbines,   
buildings, tracks, hardstanding, and other ancillary infrastructure in
accordance with the micro-siting condition;
iii)  require the ECoW to submit a quarterly report to the Planning Authority   
summarising works undertaken on site; and
iv)  require the ECoW to advise on adequate protection of nature conservation
interests on the site and be responsible for checks for protected species
before and during construction. 
The ECoW shall be appointed on the approved terms prior to the commencement
of development, throughout any period of construction activity and during any
period of post construction restoration works. 
Reason: To secure effective monitoring of and compliance with the environmental
mitigation and management measures associated with the development. 
Environmental Clerk of Works (Decommissioning) 
37.   No later than six months prior to decommissioning of the development or the
expiration of this permission (whichever is the earlier), details of the terms of
appointment of an independent environmental clerk of works throughout the
decommissioning, restoration and aftercare phases of the development shall be
submitted in writing to the planning authority for approval in writing. The
environmental clerk of works shall be appointed on the approved terms
throughout the decommissioning, restoration and aftercare phases of the
development. 
Reason: To secure effective compliance with the environmental mitigation and
management measures associated with the development during
decommissioning. 
Habitat Management Plan and Biodiversity Enhancement 
38.  Prior to the commencement of development and further to the mitigation and
enhancement contained within the Outline Habitat and Biodiversity Enhancement
Management Plan (Appendix 6.4) and associated supplementary information
hereby approved, the following must be submitted to the planning authority for
approval in writing: - 
a) An updated Habitats and National Vegetation Classification (NVC) Survey
and Outline Biodiversity Enhancement and Management Plan (OBEMP),
incorporating additional enhancement out with the development site to
strengthen habitat connectivity.
b) A detailed Habitat Management and Monitoring Plan (HMMP), as referred to
in Chapter 6 of the EIA Report. This shall set out proposed habitat
management of the site during the period of construction, operation, and
decommissioning, restoration and aftercare, and shall provide for the
maintenance, monitoring and reporting of habitat on site. This shall provide
provision and details for regular monitoring and review to be undertaken
against the HMMP objectives and reasonable measures for securing
amendments or additions to the HMP in the event that the HMMP objectives
are not being met. 
Page 20

Page 21

The approved OBEMP and HMMP shall be implemented in full, unless otherwise
agreed in advance in writing by the Planning Authority. 
Reason: In the interests of the protection of the habitats of those species
identified in the EIA Report and provision of biodiversity enhancement and to
minimise potential impacts on flora and fauna. 
Drainage 
39.   Unless otherwise agreed with the planning authority in writing, a finalised drainage
impact assessment, showing the following must be submitted to and approved in
writing by the planning authority (in consultation with Moray Flood Risk
Management Team) prior to completion of all water crossing(s) and turbine
foundation pads. The drainage impact assessment should be based upon the
designed drainage mitigation contained in Chapters 9 of the EIA report and detail
the following: 
a) plans submitted with the definitive track and turbine pad layout of the
drainage system for both the construction phase and the final site layout
once micro-siting allowances have been made; 
b)  the drainage system should be designed to a 1:30 year return period
(including 37% climate change), without surcharging, if attenuation is used
the system must drain completely within 24 hours; 
c)  demonstrate that the post development run-off rate does not exceed the
predevelopment run-off rate, or increase the risk of flooding to the
surrounding land; and
d)  confirm that drainage is not redirected to allow surface water draining from
one catchment to drain into a different catchment either at construction
phase or completion. 
Reason: To ensure all the necessary flood prevention measures are in place and
to ensure that protection of the water environment is maintained throughout the
construction, operation and decommissioning of the development. 
Construction Environmental Management Plan 
40.   No development shall commence until a Construction and Environmental
Management Plan (CEMP), containing site specific details of all on-site
construction works, post-construction reinstatement, drainage and mitigation,
together with details of their timetabling, has been submitted to, and approved in
writing by, the Planning Authority, in consultation with the Service Manager
Community Protection. The CEMP shall be informed by the site and ground
investigation works and best practice. 
The CEMP shall provide: 
a) A site waste management plan (dealing with all aspects of waste produced
during the construction period), including details of contingency planning in
the event of accidental release of materials which could cause harm to the
environment, evidencing all proposals comply with SEPA’s guidance and the
requirements of the waste management licensing regime as appropriate; 
b) Details of the location, layout, formation of the construction compound,
welfare facilities, any areas of hardstanding, turning areas, internal access
tracks, car parking, material stockpiles, oil, fuel and chemical storage,
Page 21

Page 22

lighting columns, and any construction compound boundary fencing
required for the construction period;
c) A dust management plan detailing all mitigation/dust suppression measures
intended to reduce the impacts of dust on site, including measures to
reduce dust on roads;
d) Site specific details for management and operation of any concrete batching
plant (including disposal of pH-rich waste water and substances);
e) Details of measures to be taken to prevent loose or deleterious material
being deposited on the local road network including wheel cleaning and lorry
sheeting facilities, and measures to clean the site entrances and the
adjacent local road network;
f) A Pollution Prevention and Incident Plan incorporating a Pollution Prevention
Plan, Pollution Incident Plan and a Pollution Control Monitoring Plan, this
shall provide measures to protect watercourses, groundwater, management
of natural surface hydrological flows (flushes, springs, etc.) and protection
of soils, arrangements for the storage and management of oil and fuel and
other chemicals on the site and sewage disposal and treatment;
g) Details of soil storage and management including outline quantities,
locations (other than peat and other carbon rich soils) management of long
term storage of construction generated to facilitate future site restoration;
h) A drainage management strategy, demonstrating how all surface and waste
water arising during and after construction is to be managed and prevented
from impacting on the water environment and to mitigate flood risk;
i) A surface water and groundwater management and treatment plan,
including details of the separation of clean and dirty water drains, and
location of settlement lagoons for silt laden water;
j) Details of temporary site illumination, including measures to ensure light
spill/pollution is minimised and avoids habitats within the site and does not
extend beyond the immediate working area, and not beyond the site
boundary;
k) Protected Species Plan. The Plan shall be informed by otter, badger, water
vole, red squirrel, wild cat and breeding bird surveys (for construction works
within the breeding bird season) carried out by a suitably qualified person.
The surveys shall inform the mitigation measures required to protect these
protected species during construction of the Development. The Plan shall
provide mitigation measures, as required, and a timetable for
implementation.
l) Site-specific Construction Method Statements for the following: 
i.  crane pads;
ii.  turbine foundations; 
iii.  working cable trenches; 
iv.  erection of the wind turbines; 
v.  Substation compound formation, erection of associated buildings and
ancillary infrastructure; 
vi.  watercourse crossings including full details and plans of the design
and specification of all new and upgraded watercourse crossings to be
constructed, ensuring continuous flow and fish passage with no
hanging culverts, noting all crossings shall be oversized bottomless
arched culverts or traditional style bridges; 
m) Details of post-construction restoration/reinstatement of the working areas
not required during the operation of the development; 
Page 22

Page 23

n) A Construction Noise Management Plan including details of the
management of noise and vibration during construction and post-
construction restoration, including that caused by construction traffic, to
the lowest practicable levels and in accordance with BS 5228:2009 “Code of
Practice for noise and vibration control on construction and open sites – Part
1: Noise and Part 2: Vibration” (or any updated version/document which
superseded this document) and how any properties likely to be affected by
construction noise will be kept informed; 
o) Construction Method Statements for all roads/tracks to be altered/formed
within the development site including their width, likelihood of widening or
passing places, means of drainage (which shall have regard to SUDS
principles), means of construction, and edge reinstatement including verge
width. The specification shall be accompanied by relevant plans at a scale
sufficient;
p) The cable trenches;
q) A phasing plan for the construction works; and 
r) A written scheme which details the methodology for dealing with any
revisions to any of the documents required under this part (3). Any revised
documents will require to be submitted to and approved in writing by the
Planning Authority prior to the revisions being implemented on site. 
Thereafter, the development shall be implemented in accordance with the CEMP
approved under this condition unless otherwise approved in advance in writing by
the Planning Authority. 
Reason: To ensure that all construction operations are carried out in a manner
that minimises their impact on road safety, amenity and the environment, and
that the mitigation measures contained in the EIA Report accompanying the
application, or as otherwise agreed, are fully implemented. 
Micro-siting 
41.   All wind turbines, buildings, areas of hardstanding and tracks shall be constructed
in the locations shown in drawing C4221 (P) 101 Rev A - Site Layout. The location
of the wind turbines, compounds, areas of hardstanding and tracks may be varied
(micro-sited) within the site subject to the following, unless otherwise approved in
advance in writing by the planning authority:
i)  no wind turbine, building, mast, tracks, hardstanding or other ancillary
infrastructure shall be moved more than 50 metres from the position shown
within the drawing C4221 (P) 101 Rev A - Site Layout. If any micro-siting is
sought, it must first be approved in writing by the planning authority (in
consultation with the Ministry of Defence – Safeguarding and NATS).
ii)  all micro-siting permissible under this condition must be approved in
advance in writing by the appointed ECoW. 
iii)  for any micro-siting of turbines which results in an increase in altitude of
more than 5m from the approved position, a prior request for approval in
writing must be made to the planning authority (in consultation with the
Ministry of Defence, Safeguarding and NATS). Such a request must be
accompanied by an updated and comparative ZTV plan and wireline
montages as required by the planning authority. No such micro-siting can
take place without the written approval of the planning authority. 
Page 23

Page 24

No later than two months after the date of final commissioning, an updated site
plan shall be submitted to the planning authority showing the final position of all
wind turbines, areas of hardstanding, tracks and associated infrastructure
forming part of the development. The plan must also specify areas where micro-
siting has taken place and, for each instance, be accompanied by the ECoW or
the planning authority's written approval, as applicable. 
Reason: To ensure that micro-siting decisions take account of environmental
impacts and local ground conditions, including existing infrastructure. 
Community Wealth Building Plan 
42.   Prior to development commencing, an updated Community Wealth Building Plan
shall be submitted to and approved in writing by the Council, as Planning
Authority. The plan shall be prepared in accordance with the Moray Council’s
adopted “Community Wealth Building Planning Guidance” and shall also be
accompanied by a monitoring statement, which shall demonstrate how the
development will deliver beneficial effects to the local economy from the
construction and operation of the approved wind farm.  Thereafter the
development shall be implemented in accordance with the approved details,
unless otherwise agreed in writing with the Council as Planning Authority. 
Reason: To ensure compliance with National Planning Framework 4 Policies 11
and 25 with regard to community wealth building. 
Windfarm Noise 
43.   The rating level of noise immissions from the combined effects of the wind
turbines (including the application of any tonal penalty and amplitude modulation
(AM) penalty) when determined in accordance with the attached Guidance Notes
(to this condition), shall not exceed the values for the relevant integer wind speed
set out in, or derived from, the tables  attached to these conditions at any dwelling
which is lawfully existing or has planning permission at the date of this permission
and:
a) The wind farm operator shall continuously log power production, wind speed
and wind direction, all in accordance with Guidance Note 1(d). These data
shall be retained for a period of not less than 24 months. The wind farm
operator shall provide this information in the format set out in Guidance
Note 1(e) to the Local Planning Authority on its request, within 14 days of
receipt in writing of such a request.
b) No electricity shall be exported until the wind farm operator has submitted
to the Local Planning Authority for written approval a list of proposed
independent consultants who may undertake compliance measurements in
accordance with this condition. Amendments to the list of approved
consultants shall be made only with the prior written approval of the Local
Planning Authority.
c) Within 21 days from receipt of a written request from the Planning Authority
following a complaint to it from an occupant of a dwelling alleging noise
disturbance at that dwelling, the wind farm operator shall, at its expense,
employ a consultant approved by the Local Planning Authority to assess the
level of noise immissions from the wind farm at the complainant’s dwelling
in accordance with the procedures described in the attached Guidance
Page 24

Page 25

Notes. The written request from the Local Planning Authority shall set out at
least the date, time and location that the complaint relates to and any
identified atmospheric conditions, including wind direction, and include a
statement as to whether, in the opinion of the Local Planning Authority, the
noise giving rise to the complaint contains or is likely to contain a tonal
component, or is likely to contain an amplitude modulation (AM)
component.
d) The assessment of the rating level of noise immissions shall be undertaken
in accordance with an assessment protocol that shall, prior to the
commencement of any measurements, have been submitted to and
approved in writing by the Local Planning Authority. The protocol shall
include the proposed measurement location identified in accordance with
the Guidance Notes where measurements for compliance checking
purposes shall be undertaken, whether noise giving rise to the complaint
contains or is likely to contain a tonal component and/or amplitude
modulation (AM) component and also the range of meteorological and
operational conditions (which shall include the range of wind speeds, wind
directions, power generation and times of day) to determine the assessment
of rating level of noise immissions. The proposed range of conditions shall
be those which prevailed during times when the complainant alleges there
was disturbance due to noise, having regard to the written request of the
Local Planning Authority under paragraph (c), and such others as the
independent consultant considers likely to result in a breach of the noise
limits.
e) Where a dwelling to which a complaint is related is not listed in the tables
attached to these conditions, the wind farm operator shall submit to the
Local Planning authority for written approval proposed noise limits selected
from those listed in the Tables to be adopted at the complainant’s dwelling
for compliance checking purposes.  The proposed noise limits are to be
those limits selected from the Tables specified for a listed location which
the independent consultant considers as being likely to experience the most
similar background noise environment to that experienced at the
complainant’s dwelling.  The rating level of noise immissions resulting from
the combined effects of the wind turbines when determined in accordance
with the attached Guidance Notes shall not exceed the noise limits
approved in writing by the Local Planning Authority for the complainant’s
dwelling.
f) The wind farm operator shall provide to the Local Planning Authority the
independent consultant’s assessment of the rating level of noise
immissions undertaken in accordance with the Guidance Notes within 2
months of the date of the written request of the Local Planning Authority for
compliance measurements to be made under paragraph (c), unless the time
limit is extended in writing by the Local Planning Authority. Unless otherwise
agreed in writing by the Local Planning Authority, the assessment shall be
accompanied by all data collected for the purposes of undertaking the
compliance measurements, such data to be provided in the format set out in
Guidance Note 1(e) of the Guidance Notes with the exception of audio data
which shall be supplied in the format in which it is recorded. The
instrumentation used to undertake the measurements shall be calibrated in
accordance with Guidance Note 1(a) and certificates of calibration shall be
submitted to the Local Planning Authority with the independent consultant’s
assessment of the rating level of noise immissions.
Page 25

Page 26

g) Where a further assessment of the rating level of noise immissions from the
wind farm is required pursuant to Guidance Note 4(c), the wind farm
operator shall submit a copy of the further assessment within 21 days of
submission of the independent consultant’s assessment pursuant to
paragraph (d) above unless the time limit has been extended in writing by the
Local Planning Authority. 
Table 1: Between daytime (07:00 to 23:00 hours) – Noise limits expressed in dB
LA90,10 minute as a function of the standardised wind speed (m/s) at 10 metre
height as determined within the site averaged over 10 minute periods. 
Location
Standardised 10 metre-height Wind Speed (as
defined in accordance with the attached
Guidance Notes to the noise condition)
4 5 6 7 8 9 10 11 12
Blackhillock Croft 30 35 38 39 39 39 39 39 39
North Whiteley  32 37 40 40 40 40 40 40 40
Marypark 28 33 36 36 36 36 36 36 36
Mains of Pitlurg 22 27 31 31 31 31 31 31 31
Rinnes View  27 32 35 36 36 36 36 36 36
Little Pitlurg 25 30 33 34 34 34 34 34 34
Edintore-Taber Chalich  27 32 35 35 35 35 35 35 35
Edintore Farmhouse  27 32 35 35 35 35 35 35 35
Edintore Cottage 24 29 32 32 32 32 32 32 32
Drumgrain 25 30 33 33 33 33 33 33 33
Davieburn Kennels 26 31 34 34 34 34 34 34 34
Davieburn Lodge 26 31 34 35 35 35 35 35 35
Mossend 26 31 34 34 34 34 34 34 34
Alder Brae 28 33 36 37 37 37 37 37 37
Newton 31 36 39 39 39 39 39 39 39
Quarryhead 30 35 38 38 38 38 38 38 38
Millwood 29 34 37 37 37 37 37 37 37
Auchorties 26 31 34 35 35 35 35 35 35 
Table 2: Between night time periods (23:00 to 07:00 hours) – Noise limits expressed
in dB LA90,10 minute as a function of the standardised wind speed (m/s) at 10
metre height as determined within the site averaged over 10 minute periods 
Location
Standardised 10 metre-height Wind Speed (as
defined in accordance with the attached
Guidance Notes to the noise condition)
4 5 6 7 8 9 10 11 12
Blackhillock Croft 30 35 38 39 39 39 39 39 39
North Whiteley  32 37 40 40 40 40 40 40 40
Marypark 28 33 36 36 36 36 36 36 36
Mains of Pitlurg 22 27 31 31 31 31 31 31 31
Rinnes View  27 32 35 36 36 36 36 36 36
Little Pitlurg 25 30 33 34 34 34 34 34 34
Edintore-Taber Chalich  27 32 35 35 35 35 35 35 35
Page 26

Page 27

Edintore Farmhouse  27 32 35 35 35 35 35 35 35
Edintore Cottage 24 29 32 32 32 32 32 32 32
Drumgrain 25 30 33 33 33 33 33 33 33
Davieburn Kennels 26 31 34 34 34 34 34 34 34
Davieburn Lodge 26 31 34 35 35 35 35 35 35
Mossend 26 31 34 34 34 34 34 34 34
Alder Brae 28 33 36 37 37 37 37 37 37
Newton 31 36 39 39 39 39 39 39 39
Quarryhead 30 35 38 38 38 38 38 38 38
Millwood 29 34 37 37 37 37 37 37 37
Auchorties 26 31 34 35 35 35 35 35 35 
Table 3: Co-ordinate locations of the dwellings listed in Tables 1 and 2: 
Receptor Grid Reference
Easting Northing
Blackhillock Croft 343475 848073
North Whiteley  343632 847116
Marypark 343751 846526
Mains of Pitlurg 343713 845587
Rinnes View  343051 846082
Little Pitlurg 342728 845771
Edintore-Taber Chalich  342796 845996
Edintore Farmhouse  342618 846043
Edintore Cottage 341971 845641
Drumgrain 341388 845790
Davieburn Kennels 341161 846370
Davieburn Lodge 340939 846644
Mossend 340838 846690
Alder Brae 340926 847144
Newton 341082 847486
Quarryhead 341199 848053
Millwood 341735 848498
Auchorties 342987 848930 
Note to Table 3: The geographical coordinate references are provided for the
purpose of identifying the general location of dwelling to which the noise limits
apply. 
Reason: to protect the amenity of nearby dwellings and to prevent nuisance. 
Guidance Notes for Noise Condition 
These notes are to be read with and form part of the noise condition. They further
explain the condition and specify the methods to be employed in the assessment of
complaints about noise immissions from the wind farm. The rating level at each integer
wind speed is the arithmetic sum of the wind farm noise level as determined from the
best-fit curve described in Guidance Note 2 of these Guidance Notes and any tonal
penalty applied in accordance with Guidance Note 3, and any Amplitude Modulation
(AM) penalty applied in Guidance Note 5. Reference to ETSU-R-97 refers to the
publication entitled “The Assessment and Rating of Noise from Wind Farms” (1997)
Page 27

Page 28

published by the Energy Technology Support Unit (ETSU) for the Department of Trade
and Industry (DTI). 
Guidance Note 1
a) Values of the LA90,10 minute noise statistic should be measured at the
complainant’s property, using a sound level meter of EN 60651/BS EN 60804 Type
1, or BS EN 61672 Class 1 quality (or the equivalent UK adopted standard in force
at the time of the measurements) set to measure using the fast time weighted
response as specified in BS EN 60651/BS EN 60804 or BS EN 61672-1 (or the
equivalent UK adopted standard in force at the time of the measurements). This
should be calibrated in accordance with the procedure specified in BS 4142: 1997
(or the equivalent UK adopted standard in force at the time of the measurements).
Measurements shall be undertaken in such a manner to enable a tonal penalty to
be applied in accordance with Guidance Note 3.
b) The microphone should be mounted at 1.2 – 1.5 metres above ground level, fitted
with a two-layer windshield or suitable equivalent approved in writing by the Local
Planning Authority, and placed outside the complainant’s dwelling.
Measurements should be made in “free field” conditions. To achieve this, the
microphone should be placed at least 3.5 metres away from the building facade
or any reflecting surface except the ground at the approved measurement
location. In the event that the consent of the complainant for access to his or her
dwelling to undertake compliance measurements is withheld, the wind farm
operator shall submit for the written approval of the Local Planning Authority
details of the proposed alternative representative measurement location prior to
the commencement of measurements and the measurements shall be
undertaken at the approved alternative representative measurement location.
c) The LA90,10-minute measurements should be synchronised with measurements
of the 10-minute arithmetic mean wind and operational data logged in
accordance with Guidance Note 1(d), including the power generation data from
the turbine control systems of the wind farm.
d) To enable compliance with the conditions to be evaluated, the wind farm operator
shall continuously log arithmetic mean wind speed in metres per second and
wind direction in degrees from north at hub height for each turbine, and at any on
site meteorological mast(s), if available, together with the arithmetic mean power
generated by each turbine, all in successive 10-minute periods. All 10 minute
arithmetic average mean wind speed data measured at hub height shall be
‘standardised’ to a reference height of 10 metres as described in ETSU-R-97 at
page 120 using a reference roughness length of 0.05 metres .  It is this
standardised 10 metre height wind speed data, as determined from whichever
source is agreed in writing with the Local Planning Authority as being most
appropriate to the noise compliance measurements being undertaken, which is
correlated with the noise measurements determined as valid in accordance with
Guidance Note 2, such correlation to be undertaken in the manner described in
Guidance Note 2. All 10-minute periods shall commence on the hour and in 10-
minute increments thereafter.
e) Data provided to the Local Planning Authority in accordance with the noise
condition shall be provided in comma separated values in electronic format.
f) A data logging rain gauge shall be installed in the course of the assessment of the
levels of noise immissions. The gauge shall record over successive 10-minute
periods synchronised with the periods of data recorded in accordance with Note
1(d). 
Page 28

Page 29

Guidance Note 2
a) The noise measurements shall be made so as to provide not less than 20 valid
data points as defined in Guidance Note 2 (b)
b) Valid data points are those measured in the conditions specified in the agreed
written protocol under paragraph (d) of the noise condition, but excluding any
periods of rainfall measured in the vicinity of the sound level meter. Rainfall shall
be assessed by use of a rain gauge that shall log the occurrence of rainfall in each
10 minute period concurrent with the measurement periods set out in Guidance
Note 1.
c) For those data points considered valid in accordance with Guidance Note 2(b),
values of the LA90,10 minute noise measurements and corresponding values of
the 10- minute standardised ten metre height wind speed, as derived from the site
measured wind speed source(s) agreed in writing with the Local Planning
Authority in accordance with Guidance Note 1(d), shall be plotted on an XY chart
with noise level on the Y-axis and the standardised mean wind speed on the X-
axis. A least squares, “best fit” curve of an order deemed appropriate by the
independent consultant (but which may not be higher than a fourth order) should
be fitted to the data points and define the wind farm noise level at each integer
speed. 
Guidance Note 3
a) Where, in accordance with the approved assessment protocol under paragraph
(d) of the noise condition, noise immissions at the location or locations where
compliance measurements are being undertaken contain or are likely to contain a
tonal component, a tonal penalty is to be calculated and applied using the
following rating procedure.
b) For each 10 minute interval for which LA90,10 minute data have been determined
as valid in accordance with Guidance Note 2 a tonal assessment shall be
performed on noise immissions during 2 minutes of each 10 minute period. The 2
minute periods should be spaced at 10 minute intervals provided that
uninterrupted uncorrupted data are available (“the standard procedure”). Where
uncorrupted data are not available, the first available uninterrupted clean 2
minute period out of the affected overall 10 minute period shall be selected. Any
such deviations from the standard procedure, as described in Section 2.1 on
pages 104-109 of ETSU-R-97, shall be reported.
c) For each of the 2 minute samples the tone level above or below audibility shall be
calculated by comparison with the audibility criterion given in Section 2.1 on
pages 104109 of ETSU-R-97.
d) The average tone level above audibility shall be calculated for each wind speed
bin, each bin being 1 metre per second wide and centred on integer wind speeds.
Samples for which the tones were below the audibility criterion or no tone was
identified, a value of zero audibility shall be substituted.
e) The tonal penalty for each wind speed bin is derived from the margin above
audibility of the tone according to the figure below.   
Page 29

Page 30

Guidance Note 4
a) If a tonal penalty is to be applied in accordance with Guidance Note 3 the rating
level of the turbine noise at each wind speed is the arithmetic sum of the
measured noise level as determined from the best fit curve described in Guidance
Note 2 and the penalty for tonal noise as derived in accordance with Guidance
Note 3 at each integer wind speed within the range specified by the Local Planning
Authority in its written protocol under paragraph (d) of the noise condition.
b) If no tonal penalty is to be applied, then the rating level of the turbine noise at
each wind speed is equal to the measured noise level as determined from the
best fit curve described in Guidance Note 2.
c) In the event that the rating level is above the limit(s) set out in the Tables attached
to the noise conditions or the noise limits for a complainant’s dwelling approved
in accordance with paragraph (e) of the noise condition, the independent
consultant shall undertake a further assessment of the rating level to correct for
background noise so that the rating level relates to wind turbine noise immission
only.
d) The wind farm operator shall ensure that all the wind turbines in the development
are turned off for such period as the independent consultant requires to
undertake the further assessment. The further assessment shall be undertaken in
accordance with the following steps 
e) To this end, the steps in Guidance Note 2 shall be repeated with the required
number of turbines shut-down in accordance with Guidance Note 4(d) in order to
determine the background noise (L3) at each integer wind speed within the range
requested by the Local Planning Authority in its written request under paragraph
(c) and the approved protocol under paragraph (d) of the noise condition.
f) The wind farm noise (L1) at this speed shall then be calculated as follows where
L2 is the measured level with turbines running but without the addition of any
tonal penalty: 
g) The rating level shall be re-calculated by adding arithmetically the tonal penalty (if
any is applied in accordance with Note 3) to the derived wind farm noise L1 at that
integer wind speed.
h) If the rating level after adjustment for background noise contribution and
adjustment for amplitude modulation and/or tonal penalties (if required in
accordance with Guidance Note 3 and 5 ) at any integer wind speed lies at or
below the values set out in the Tables attached to the conditions or at or below
the noise limits approved by the Local Planning Authority for a complainant’s
Page 30

Page 31

dwelling in accordance with paragraph (e) of the noise condition then no further
action is necessary. If the rating level at any integer wind speed exceeds the
values set out in the Tables attached to the conditions or the noise limits
approved by the Local Planning Authority for a complainant’s dwelling in
accordance with paragraph (e) of the noise condition, then the development fails
to comply with the conditions. 
Guidance Note 5
a) Where, in accordance with the assessment protocol agreed under the noise
condition, noise immissions at the location or locations where compliance
measurements are being undertaken contain or are likely to contain an amplitude
modulation component, an amplitude modulation penalty is to be calculated and
applied using the following rating procedure.
b) The analysis of amplitude modulation shall be undertaken using the Institute of
Acoustics (IOA) metric described in “A Method for Rating Amplitude Modulation in
Wind Turbine Noise” dated 9th August 2016 or any update of that method. The
value of AM obtained with the IOA metric for each ten-minute period shall be
converted to a penalty in decibels in accordance with the graph below. At each
integer wind speed, a penalty for AM would be based on the arithmetic average of
the calculated penalties for all valid periods assessed at this wind speed. 
Guidance Note 6
a) At each integer wind speed, the tonal penalty determined in accordance with
Guidance Note 3 and the amplitude modulation penalties determined in
accordance with Guidance Note 5 would be added arithmetically, except where
the AM penalty and the tonal penalty relate to the same characteristic (e.g.
amplitude modulated tones), only the larger of the AM or tonal penalty should be
applied. 
44.   There shall be no Commencement of Development unless full details of the
proposed wind turbines (including the power rating, sound power levels, and
tonality assessment carried out on the selected turbine) have been submitted to
and approved in writing by the Planning Authority. 
Page 31

Page 32

Reason: To allow the Planning Authority to monitor compliance with controls on
noise imposed by conditions on this consent. 
45.   The wind farm operator shall employ an independent consultant, approved by the
Planning Authority, to measure and where necessary calculate, at the operator’s
own expense, the level of noise immissions from the wind turbines within the first
year of the operation of the turbines. The measurement procedures, which may
include filtering data according to wind direction, shall be agreed with the
Planning Authority prior to commencement. The results of any measurement
exercise shall be forwarded to the Planning Authority as soon as practicable after
the completion of the monitoring exercise. 
Reason: To check compliance with the immission limits set in the Noise
Condition above and thereby to protect the amenity of nearby dwellings and
prevent nuisance. 
46.
a) Construction work shall only take place on the site between the hours of
07.00 to 19.00 on Monday to Friday inclusive and 07.00 to 16.00 on
Saturdays, with no construction work taking place on a Sunday or on
national public holidays or bank holidays other than concrete pouring if
started within those hours, turbine erection and emergency works. The
developer shall notify the Planning Authority of such works if carried out
outside the permitted hours within two working days of their occurrence.
b) Heavy Goods Vehicles (HGV) movements to and from the site (excluding
abnormal loads) during construction of the wind farm shall be limited to
07.00 to 19.00 Monday to Friday, and 07.00 to 16.00 on Saturdays, with no
HGV movements to or from site taking place on a Sunday or on national
public holidays or bank holidays unless otherwise agreed in writing by the
Planning Authority.
c) Turbine delivery may be made out with these construction hours, where
necessary, and as agreed in writing in advance with the Planning Authority. 
For the avoidance of doubt the public holidays or bank holidays are detailed as
follows: 
• New Year's Day, if it is not a Sunday or, if it is a Sunday, 3rd January; 2nd
January, if it is not a Sunday or, if it is a Sunday, 3rd January; 
• Good Friday; 
• The first Monday in May; 
• The first Monday in August; 
• 30th November, if it is not a Saturday or Sunday or, if it is a Saturday or
Sunday, the first Monday following that day; 
• Christmas Day, if it is not a Sunday or if it is a Sunday, 27th December; and
Boxing Day, if it is not a Sunday or, if it is a Sunday, the 27th December. 
Reason: To protect local residents from noise nuisance in ensuring the
construction phase is restricted within permitted hours. 
Shadow flicker 
Page 32

Page 33

47.   At the reasonable request of the Planning Authority following a complaint the wind
farm operator shall investigate and instigate appropriate measures to minimise
the effects of shadow flicker.  
Reason: To protect the amenity of nearby dwellings from shadow flicker and to
prevent nuisance. 
Decommissioning, Restoration and Aftercare 
48.
a) The development will cease to generate electricity by no later than the date
falling 40 years from the date of final commissioning. The total period for
decommissioning and restoration of the site in accordance with this
condition shall not exceed 42 years from the date of final commissioning
without prior written approval of the planning authority.
b) Prior to the commencement of development an outline decommissioning,
restoration and aftercare method statement shall be submitted to and
approved in writing by the planning authority in consultation with the
Scottish Environment Protection Agency. The method statement shall
include measures for the decommissioning of the development, restoration
and aftercare of the site and will include, without limitation, proposals for
the removal of the above ground elements of the development, the
treatment of ground surfaces, the management and timing of the works and
environmental management provisions. 
c) No later than one year prior to decommissioning of the development or the
expiration of the 40 year period of operation (whichever is the earlier) a
detailed decommissioning, restoration and aftercare method statement,
based upon the principles of the approved outline decommissioning,
restoration and aftercare method statement, shall be submitted to the
planning authority for written approval in consultation with the Scottish
Environment Protection Agency. The detailed decommissioning, restoration
and aftercare method statement will provide updated and detailed
proposals for the removal of above ground elements of the development, the
treatment of ground surfaces, the management and timing of the works and
environment management provisions. 
d) The development shall be decommissioned, site restored, and aftercare
thereafter undertaken in accordance with the detailed decommissioning,
restoration and aftercare method statement as approved, unless otherwise
agreed in writing in advance with the planning authority in consultation with
Scottish Environment Protection Agency. 
Reason: To ensure the decommissioning and removal of the development in an  
appropriate and environmentally acceptable manner and the restoration and
aftercare of the site, in the interests of safety, amenity and environmental
protection. 
Financial Guarantee 
49.
a) No development shall commence until a bond or other form of financial
guarantee in terms which secures the cost of performance of all
decommissioning, restoration and aftercare obligations referred to in
Page 33

Page 34

condition 48 has been submitted to and approved in writing by the planning
authority. 
b) The value of the financial guarantee shall be agreed between the developer
and the planning authority or, failing agreement, determined (on application
by either party) by a suitably qualified independent professional as being
sufficient to meet the costs of all decommissioning, restoration and
aftercare obligations referred to in condition 48 above.
c) The financial guarantee shall be maintained in favour of the planning
authority until the date of completion of all decommissioning, restoration
and aftercare obligations referred to in condition ‘48’ above.
d) The value of the financial guarantee shall be reviewed by agreement
between the developer and the planning authority or, failing agreement,
determined (on application by either party) by a suitably qualified
independent professional not less than every five years and at the time of the
approval of the detailed decommissioning, restoration and aftercare plan
approved under condition 48. The value of the financial guarantee shall be
increased or decreased to take account of any variation in costs of
compliance with decommissioning, restoration and aftercare obligations
referred to in condition 48 and best practice prevailing at the time of each
review. 
Reason: To ensure that there are sufficient funds to secure performance of the
decommissioning, restoration and aftercare conditions attached to this deemed
planning permission in the event of default by the developer. 
Page 34

Page 35

Report to: Planning and Regulatory
Services Committee
Meeting Date: 16 December 2025  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Andrew Miller Contact
Email:
andrew.miller@moray.gov.uk 
Subject: 25/01634/S37 - Consultation response to Scottish Minsters for a
proposed 186km overhead transmission line (400kV) and associated
development between Beauly and Peterhead 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider the consultation request received from the Energy
Consents Unit (ECU) of the Scottish Government in relation to an application under
section 37 of the Electricity Act 1989 for a new overheard electricity line running between
Beauly and Peterhead. This section of the Act relates to consent for onshore electricity
transmission infrastructure.  
1.2  This report is submitted to Committee in terms of Section III (E) (1) of the Council’s
Scheme of Administration relating to exercising the function of the Council as Planning
Authority. 
2.  SUMMARY  
2.1  This report considers a consultation request from the ECU seeking a response from Moray
Council on an application made by Scottish Hydro Electric Transmission PLC under
section 37 of the Electricity Act 1989 for a new 400kV overhead electricity transmission
line running between Beauly and Peterhead. It recommends the Council raise no objection
to the consultation response, subject to a suite of conditions to mitigate the impact of the
proposal on local infrastructure, the environment and the amenity of the area surrounding
the proposed route. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  consider and note the contents of the report, as set out in Appendix 1,
including the conclusions about the planning and wider merits of the
development (see Section 5 below) where taking into account National
Planning Framework 4, Moray Local Development Plan 2020 and all other
material considerations, it is recommended that Moray Council does not
Item 5.
Page 35

Page 36

object to the section 37 application; and   
ii)  agree to respond to the consultation from the Energy Consents Unit, raising
no objection to the currently proposed development on the basis of the
recommendations set out in Appendix 1 and conditions in Appendix 2.   
3.2  If the Committee are minded to raise an objection to the section 37
consultation, the Committee should provide reasons for formally objecting
to the section 37 application, but officers recommend the approach
suggested in 3.1 (ii) above.   
Andrew Miller
Acting Principal Planning Officer 
4.  BACKGROUND AND CONTEXT  
4.1  As the proposal involves obtaining consent to install, operate, and maintain an electric
line of 132 kilovolt (kV) or above (in this case a 400kV line), the determination of the
proposal rests with the Electricity Consents Unit (ECU) within the Scottish Government.
The ECU is responsible for consulting statutory consultees and relevant local authorities,
receiving representations, and making the final decision. In this context, the Council acts
as a consultee rather than the determining authority. The ECU has requested comments
from the Council, as well as Aberdeenshire and Highland Councils, regarding the
proposed electric line within a specified timeframe, alongside responses from other
consultees. Notably, if a Council objects to a section 37 consultation, this generally
triggers a Public Local Inquiry (PLI). 
5.  PROPOSALS  
5.1  The proposal subject to this consultation is described as a new double circuit steel
structure 400 kV overhead line (OHL) to connect into new substation sites at Beauly, New
Deer and Peterhead with a length of 186 km, 59 km of which would be in Moray. A detailed
description of the OHL route and infrastructure proposed is in sections 3 and 4 of
Appendix 1.  
5.2  A report of handling as detailed in Appendix 1 details the main considerations for the
Council in responding to the consultation request. The report finds that the OHL and
resultant loss of woodland to accommodate it will have significant adverse landscape and
visual impact on Moray, particularly at the River Spey, Glen Rothes, Newmill and Keith. An
alternative alignment to accommodate the proposed Kellas Drum Wind Farm would also
have effects (including cumulative) on the Kellas area.  
5.3  The report of handling also identifies impacts on woodland and forestry loss, impacts on
peat and soils, transportation and access routes, flooding, cultural heritage, ecology and
biodiversity. Socio-economic benefits of the proposal are also considered. It concludes
that, while the proposal will result in significant landscape, visual, and ecological impacts,
its role as a nationally important strategic development supporting the electricity grid and
Net Zero targets is acknowledged. The principle of development is established under
national planning policy (National Planning Framework 4). Balancing these
considerations, it is recommended the Council raise no objection to the proposal, but this
is subject to conditions as well as a number of caveats/requests of Scottish Ministers as
specified in Appendix 1 and Appendix 2.
Page 36

Page 37

6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial X 
Risk X 
Staffing X 
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact            X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The application is made for consent under section 37 of the Electricity Act 1989 to the
Scottish Ministers, and is processed by the Energy Consents Unit of the Scottish
Government. If consented, planning permission is deemed to be granted for the
development under section 57 of the Town and Country Planning (Scotland) Act 1997. If
granted by the Scottish Ministers, the responsibility for the discharge of (planning)
conditions attached to the formal decision to grant consent will pass to the Council (along
with Aberdeenshire and Highland Councils).  
6.4  Financial 
If this committee is minded to object to the proposal, a Public Local Inquiry (PLI) may be
arranged by Scottish Government. The Council would be expected to attend and
Page 37

Page 38

participate in the Inquiry process, including any pre-Inquiry arrangements with resultant
costs, including officer, legal representation and consultant costs where
required/appropriate. An application fee was received by the Council (£57,049 as its share
of the overall application fee of £360,000). The cost of any PLI would likely use up most of
the fee the Council received should an objection be raised. 
Whilst support to Development Management would be provided by Legal Services it is
likely in the event of a PLI that additional legal representation, possibly including Counsel,
would be needed to assist in the preparation and presentation of the Council’s case. 
At Inquiry, the applicant may seek an award of costs against the Council if it is considered 
the Council has acted unreasonably. 
6.5  Risk 
If the Council decides not to respond within the agreed period it would be open to the
Scottish Ministers to proceed and determine the application. 
If deciding to object, the outcome of any Public Local Inquiry held to consider this
proposed development is uncertain: it might uphold and support the Council’s decision to
object, but equally the objection could be dismissed and consent granted for the
development.  
6.6  Staffing 
In the event that a Public Local Inquiry is convened, staff time and resources - including
those of Elected Members, planning officers, and legal officers - will be required for the
preparation and attendance associated with the Inquiry. 
As a priority application for the Scottish Ministers, the target timescale for determination
is 52 weeks from the date of application, which includes any periods related to the Inquiry.
If the Scottish Ministers decide that a public inquiry is necessary for this application, it is
likely that the pre-inquiry meeting will take place during the week commencing 9 February
2026, with any subsequent hearing or inquiry session likely to begin in the week
commencing 11 May 2026.  
6.7  Best Value and Transformation 
None.  
6.8  Property 
None.  
6.9  Information Communications/Technology/Digital 
None.   
6.10  Equalities, Social Inclusion and Economic Impact 
The development itself will deliver significant socio-economic benefits for the local
economy through its construction and operation (subject to a Community Wealth Building
approach to be agreed with the Council), as well as wider benefits for the Scottish and UK
economies. The proposal will also enable delivery of more renewable energy projects in
the north of Scotland, with subsequent economic benefits from these projects.  
6.11  Climate Change and Biodiversity Impacts
Page 38

Page 39

As detailed in the Appendix 1 report, the proposed development has the potential to make
a considerable contribution toward the transmission of low carbon-based electricity
generation so significant weight is attached to this element. Switching to renewable
sources of energy is acknowledged to make a large contribution toward climate change
goals. Biodiversity and other environmental impacts are sought to be mitigated by those
measures proposed within the Environmental Impact Assessment Report as well as the
suggested mitigation as shown in the recommendation conditions in Appendix 2. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Finance; Head of Growth, Climate & Climate (Chief Planning Officer);
Service Manager Legal Services; Acting Service Manager Planning & Building Standards;
Equal Opportunities Officer; Service Manager Strategic Planning and Development; and 
Service Manager Democratic Services and any comments made have been incorporated
into the report.   
8.  BACKGROUND PAPERS  
8.1  Appendix 1, 2 and 3 attached.   
Page 39

Page 40

Page 40

Page 41

MORAY COUNCIL
Response to consultation issued by Scottish Ministers
THE ELECTRICITY ACT 1989 – SECTION 37
ELECTRICITY (APPLICATIONS FOR CONSENT) REGULATIONS 1990
INSTALL, OPERATE AND KEEP INSTALLED APPROXIMATELY 186 KM OF NEW 400
KILOVOLT (KV) DOUBLE CIRCUIT STEEL STRUCTURE OVERHEAD TRANSMISSION
LINE (OHL), INCLUDING DOWNLEADS AND ASSOCIATED INFRASTRUCTURE
BETWEEN BEAULY AND PETERHEAD
(MORAY COUNCIL REF: 25/01364/S37, ECU REF: ECU00005165)
1. INTRODUCTION
1.1. On 16 October 2025 Scottish Hydro Electric Transmission PLC
(trading/operating as Scottish and Southern Electricity Networks Transmission)
submitted an application under section 37 of the Electricity Act 1989 requesting
Scottish Ministers’ grant consent to install and keep installed approximately 186
km of 400 kilovolt (kV) double circuit steel structure overhead transmission line
(OHL), including downleads, to connect into new substation sites at Fanellan
(Beauly, Highland); Greens (New Deer, Aberdeenshire); and Netherton
(Peterhead, Aberdeenshire). The Proposed Development also includes crossing
works, temporary diversions and permanent realignment works to existing 132
kV and 275 kV OHLs, of approximately 14.7 km in total, and ancillary
development and associated works. In total, the Proposed Development would
comprise approximately 200.7 km of new OHL infrastructure. The proposed
development is within the planning authority areas of Highland Council, Moray
Council and Aberdeenshire Council.
1.2. This application will be determined by Scottish Ministers via the Scottish
Government’s Energy Consents Unit (ECU), and not by Moray Council as the
Local Planning Authority (LPA).
1.3. In determining the section 37 application, the views of Moray Council, as LPA
are being sought by the ECU, along with those of Aberdeenshire and Highland
councils. The Council’s role in the process is therefore as a statutory consultee.
In responding with comments, the Council has a right to object or not to the
application, as well as commenting on the conditioning of the consent. If the
Council objects to the proposed development and the objection is not later
withdrawn, or the areas of objection cannot be addressed by conditions then
ECU/Scottish Ministers are likely to convene a Public Local Inquiry. For clarity,
any public representations are considered directly by the ECU, and not the LPA
as consultee.
1.4. Prior to determination, the ECU are responsible for affording publicity of the
proposal and taking account of all representations received, whether from the
Appendix 1
Page 41

Page 42

public or interested parties, and for consulting with agencies and organisations
(consultees). Internal consultation with relevant services/sections within the
Council has been undertaken to provide a comprehensive response in
responding to the consultation. 
1.5. This proposal qualifies as a priority application for consent to install overhead
line transmission under the definitions established by the Scottish Government.
It falls within the definition of Strategic Transmission Infrastructure which
enhances capacity or improves security of supply within Scotland’s electricity
network. Scottish Government guidance states such applications are subject to
an anticipated 52-week determination period. Consequently, the period for
comments from local planning authorities, other statutory consultees, and the
public is limited and will not be subject to extension. For this consultation, the
Council must respond by 18 December 2025, which is two months after the
ECU issued the consultation request on 17 October 2025. 
1.6. This report examines how the proposal will affect the Moray Council
administrative area and highlights key points for the Council, acting as the LPA,
to consider in its response to the consultation request. 
2. SITE HISTORY 
2.1. The site subject to this application is extensive, taking in a corridor of
approximately 59km running east-west through Moray. There is significant
planning history on and around the site. 
2.2. Of relevance to this proposal, the Council responded to a consultation on an
EIA Scoping Opinion request to Scottish Ministers on 22 August 2024 (ref:
24/01085/S36SCO). 
2.3. Kellas Drum Wind Farm (our ref: 24/00486/S36) as proposed has an impact on
the alignment of the proposed line, as described below. The section 36
application for this wind farm is still pending consideration. The Council’s
Planning and Regulatory Services Committee raised no objection to the wind
farm as amended (8 turbines at 149.9 metres high) on 28 May 2025. 
3. THE SITE 
3.1. The proposed OHL would run between Beauly and Peterhead, in the
administrative areas of Highland Council, Moray Council and Aberdeenshire
Council. The proposal would be located within a predominantly rural area with
taking in upland forests, moorland, agricultural land and rivers. It crosses a
number of roads and paths, including core paths and rights of way. Settlements
in proximity of the proposed OHL include Elgin (4.6 km), Fochabers (1.7 km),
Newmill (327 m) and Keith (1 km). 
Page 42

Page 43

3.2. The following table describes the route from west to east as per the sections
identified in the supporting information (EIA Report Vol 3, Chapter 4, Figure 4.8)
provided with the application. It also describes any designations the route
passes through or is in proximity to in Moray. 
Section Route Description Designations
1 - 11 Within Highland Council area, the route
would begin at a new substation at Beauly,
passing east crossing the Caledonian Canal
to the south of Inverness. It continues east
to Moray passing to the south of Culloden
and Cawdor towards Ferness.
Not in or affecting Moray so
not detailed as part of this
report.
12 Passing south of Ferness in Highland, the
OHL enters Moray to the north of Cairn
Duhie, remaining south of the existing 275
kV OHL. It crosses the A940 and the Dava
Way, then turns northeast across the River
Divie towards Hill of Tomechole, passing to
the south east of Hill of Glaschyle Wind
Farm to Johnstripe. 
Findhorn Valley and the
Wooded Estates SLA to north
0.7 km north 
Modiach More SSSI and SAC
1.8 km south 
Lower Findhorn Woods SAC
1.9 km north 
Darnaway and Lethen Forest
SPA 5km north west
13 From Johnstripe, the OHL passes through
upland forestry north of Loch Dallas, then
heads east crossing upper Glen Lossie to
Moss of Bednawinny. 
None
14 The OHL continues northeast from Moss of
Bednawinny, crossing the C13E (Dallas to
Knockando Road) towards Kellas. East of
Meikle Hill, two potential alignments have
been put forward taking account of the
proposed Kellas Drum Wind Farm:
• Preferred alignment: continues
northeast, south of Glenlatterach
Reservoir.
• Kellas Alternative Alignment: goes north
then east around the proposed wind
farm, passing north of Glenlatterach
Reservoir (proposed should Kellas Drum
Wind Farm be consented). 
Kellas Oakwood SSSI (0.8 km
north of northern alignment,
2.6 km north of southern
alignment) 
Buinach and Glenlatterach
SSSI immediately north of
Kellas Alternative Alignment,
1.1 km north of preferred
alignment.
15 From Glenlatterach Reservoir, both
alignments converge to the north of Pikey
Gulls Nest SSSI 1.5 km south
of eastern converging point of
Page 43

Page 44

Hill, crossing the A941 between Coleburn
and Netherglen (south of Fogwatt). 
both options.
16 The OHL turns north, climbing the relatively
steep eastern banks of upper Glen Rothes,
it then proceeds north east/east along the
northern slopes of Brown Muir, to the south
of the route of the existing 275 kV line
towards and through Badentinan Wood,
north of the Scottish Water water works. 
Coleburn Pasture SSSI
passes over northern edge of
this. 
Loch Spynie Ramsar & SSSI
9.4 km north
17 From Badentinan Wood, the OHL passes
east, crossing the B9103 Lossiemouth to
Mulben road to Orbliston. In this area the
OHL has to cross two existing 275kV OHLs,
as well as the Inverness to Aberdeen railway
line. To the immediate east of the railway
line, the OHL route turns south east,
crossing the B9015 Rothes to Kingston road
and the unclassified Dipple Road (U19E) to
the north of Inchberry to the eastern banks
of the River Spey.
Teindland Quarry SSSI
approx. 550 m south
18 Moving east, the OHL crosses the River
Spey to the north of the existing OHLs, and
heads east through the Wood of
Ordiequish. The route continues southeast,
crossing A96 at the top of the Dramlachs,
then turning south east passing through
agricultural land, crossing the B9016 (Keith
to Buckie road) north of Aultmore towards
Auchairn.
The River Spey Valley SLA
(within SLA) 
Moray and Nairn SPA and
Ramsar 3 km north 
Crosses River Spey SAC and
SSSI 
Lower River Spey – Spey Bay
SAC 3 km north and 2.4 km
south (sections both
upstream and downstream) 
Lower River Spey SSSI 2 km
north 
Spey Bay SSSI  6.75 km north
19 Heading east, the OHL passes to the north
of Newmill, where it then turns south east,
passing east of Newmill, crossing the River
Isla, A95 and Inverness to Aberdeen railway
line at the Banff Turnpike. To the east of
Keith, the OHL then proceeds south to the
west of Balloch Wood, meeting with the
Aberdeenshire Council boundary at
Keith Countryside Around
Towns – passes through 
Mill Wood SSSI adjacent to
proposal 
Den of Pitlurg SSSI (straddles
Moray-Aberdeenshire
Page 44

Page 45

Coachford, north of the A96. boundary) 1.7 km SE from
closest point in Moray.
20 & 21 The OHL route to the east of Coachford
stays within Aberdeenshire, running to the
north of Huntly, though it will have be visible
from the Rothiemay area of Moray (OHL
would be circa 1.8 km to the south of the
Moray boundary at its closest point).
Deveron Valley SLA (Moray)
1.8 km to north.
22 - 29 Route continues east to proposed
substations at New Deer and Peterhead.
Not in or affecting Moray so
not detailed as part of this
report. 
4. THE PROPOSAL 
• The proposed development is to install, operate and keep installed
approximately 186 kilometres (km) of new 400 kV double circuit OHL between
new substation sites proposed at Beauly and Peterhead. Within Moray the OHL
would have a length of 59 km. Consent is sought under section 37 of the
Electricity Act 1989 and deemed planning permission in terms of section 57(2) of
the Town and Country Planning (Scotland) Act 1997.
• There would be permanent modifications to existing OHLs at four locations in
Moray (two at Orbliston and two to the east of Keith) where the proposed OHL
crosses these. Temporary modifications to OHLs are also proposed as part of
these works.
• As noted under the site description, two alignments are proposed to the south of
Kellas. The alignment that would be taken forward is dependent on the outcome
of a section 36 application for the proposed Kellas Drum Wind Farm (to which
Moray Council raised no objection in May 2025). The total length of the Kellas
Alternative Alignment is 8.8 km. If the Kellas Alternative Alignment is
constructed, the total length of new 400 kV double circuit OHL would be 187.5
km (making Moray’s section 60.5 km in length) – 1.5 km longer than the preferred
alignment. 
• The pylons proposed would be steel lattice towers formed of galvanized steel
and grey in colour comprising:
o suspension towers: used for straight sections of OHL where there is no
need to manage uplift loads on the support structure;
o angle / tension towers: these are used either for straight sections, where
there is a need to manage uplift loads on the support structure, where
there is an operational security requirement, or where there is a need to
change the direction of the OHL alignment; and
o terminal towers: proposed at the substations, from which the termination
of the OHL to the substation is made. The conductors extend from the
tower arms horizontally and downwards into the substation. (NOTE -
None of these proposed in Moray.)
• Pylons would vary in height between 48 m and 72 m (with one at 95 m crossing
the Caledonian Canal at Inverness). The majority of pylons in Moray would be 55
Page 45

Page 46

– 63 m in height. The entire length of line would have 549 towers (172 in Moray),
though if the Kellas Alternative Alignment is taken forward this would require 554
towers (177 in Moray). The span length between the pylons varies depending on
topography and other constraints, with an average span 338 m in length. 
• Where crossings of existing OHLs are necessary, existing lines would be
modified by splitting in two and crossing under the line and rejoining at the other
side, either in a diamond formation around a new tower for the proposed OHL or
“ducking under” wires of the proposed OHL.  
• Associated ancillary development for which deemed planning permission is
sought includes:
o the upgrade of existing, or creation of new, bellmouth junctions at public
road access points; 
o the formation of access tracks (permanent, temporary, and upgrades to
existing tracks) and the installation of bridges and culverts to facilitate
access; 
o working areas around infrastructure to facilitate construction; 
o formation of flat areas from which the conductor will be pulled during
construction, which will contain earthed metal working surfaces referred
to as Equipotential Zones (EPZs); 
o vegetation clearance and management;
o other temporary measures required during construction, such as
measures to protect road and water crossings during construction
(scaffolding etc.); and 
o public road improvements which would be required in some areas to
facilitate construction traffic.
• To accommodate changes to the OHL route should there be geotechnical or
detailed design issues, Limits of Deviation (LoD) have been proposed as follows:
o OHL infrastructure:
 Suspension towers: 100 m radius; Tension towers: 200 m radius
 Conductors: 100 m either side of centreline
 All working areas within LoD
o Access tracks:
 New tracks or major upgrades: 100 m either side
 Minor upgrades: 50 m either side
 LoDs merge if within OHL LoD
o Forestry areas: LoD widened to 145 m either side for flexibility in tower
micrositing. 
• Across its entire route, the proposal would require the removal of 471.05 ha of
woodland. In Moray, 189.58 ha of woodland would be removed, made up of the
following woodland types:
o Commercial forestry – 176.13 ha
o Native woodland – 12 ha
o Ancient woodland of semi-natural origin – 1.45 ha
• The Kellas Alternative Alignment would necessitate removal of 11.84 ha of
commercial forestry and 2.41 ha of native woodland over and above the figures
specified above.
Page 46

Page 47

• The proposal is considered to be an EIA development, and as such is
accompanied by an EIA Report. 
• It is anticipated that (if consented) construction of this proposal would
commence in 2026, with an estimated completion date and
commissioning/energisation in late 2030. Construction activities across the
proposed overhead line (OHL) will be carried out on various sections throughout
the construction period, rather than proceeding sequentially in a single direction
(for example, from west to east).
• Other works associated with the proposed OHL - such as contractors/works
compounds and borrow pits - may need separate planning permission or could
be permitted development. Notably substations along the route will need
planning permission, albeit none are proposed in Moray. 
5. ADVERTISEMENTS 
Advertisements will have been carried out by the ECU who are determining the
application. 
6. CONSULTATIONS 
As noted above, consultations are limited to Council services. Consultations with
external bodies such as SEPA are undertaken directly by the Energy Consents Unit.
Internal consultation responses from Council departments are summarised as follows: 
Contaminated Land – No objections. 
Environmental Health – No objections subject to condition requiring Construction
Environment Management Plan to minimise and mitigate construction related noise
(including vibration), dust and artificial lighting. 
Private Water Supplies – No objections subject to condition requiring a Private Water
Supply Management Plan and Private Water Supply Monitoring Plan, along with suitable
mitigation measures. 
Strategic Planning and Development – This application will be considered against the
policies of the Moray Development Plan, which consists of National Planning
Framework 4 (NPF4) and the Moray Local Development Plan (MLDP) 2020. The following
response provides an overview of key planning polices in respect of this application.
There may be other planning policies and material considerations that require to be
considered as part of this application. 
Energy Infrastructure and Development Principles (NPF4 National Spatial Strategy and
Policies 1, 2, 4 and 11; MLDP Policies DP1 and EP3) 
The proposed development is designated under NPF4 as National Development 3
Strategic Renewable Electricity Generation and Transmission Infrastructure. NPF4
emphasises the need for strategic reinforcement of the transmission grid to connect
and transmit from renewable energy development and the development would
Page 47

Page 48

contribute significantly towards the delivery of the UK and Scottish Government’s Net
Zero targets. The principle of the proposal therefore complies with NPF4 National
Spatial Strategy and Policies 1 and 2. 
NPF4 Policy 11 (c) requires proposals to demonstrate that they maximise net economic
impact, including local and community socio-economic benefits such as employment,
associated business and supply chain opportunities. A Socio-economic Assessment
has been submitted, and a number of conditions have been proposed relating to post-
consent. These should be agreed with the Planning Authority in consultation with the
Strategic Planning and Development section. 
The proposal crosses through The Spey Valley Special Landscape Area (SLA). NPF4
Policy 4 and MLDP Policy EP3 seeks to protect designated landscapes for development
which has significant adverse effects on their integrity or qualities. Given the scale of
the proposal, the development will have a significant effect on the integrity, character
and special qualities of this designation. The proposal therefore is contrary to NPF4
Policy 4 (d) (i) and MLDP Policy EP3. The undergrounding of the line in this section of the
route would reduce the severe significant landscape and visual effects likely to occur in
relation to the Spey Valley crossing. 
The Kellas Alternative Alignment should be avoided as it would result in significant
adverse landscape and visual effects, including significant cumulative effects with the
Kellas Drum Wind Farm which is assumed to be consented/constructed if the
alternative route is selected. The preferred route alignment would have minimal effects
on residential properties, roads and recreational routes in the Kellas area. The preferred
route would conflict with the proposed Kellas Drum Windfarm location. 
The Council’s appointed Landscape Adviser has undertaken a detailed review of the
proposal. The assessment concludes that: 
• The proposed route has sought to minimise views from settlements and effects
on designated landscapes where possible. 
• Significant adverse landscape and visual effects will arise particularly close to
the route of the line due to the nature and scale of the infrastructure proposed. 
• The most significant adverse effects are likely to occur on: people using the Dava
Way; Glen Lossie; the Kellas area; Glen Rothes and views from the A941; the
Spey Valley crossing and the Keith/Newmill area. 
• The crossing of existing overhead lines in the Spey Valley and Keith area will be
particularly intrusive due to the concentration of intersecting towers and lines at
these points. 
• Whilst the proposal is largely aligned through less settled areas of commercial
forestry, minimising effects on communities and landscape and visual effects,
189.58ha of woodland would be permanently lost in Moray. 
The report by the Landscape Adviser on the proposed development provides a fuller
assessment on landscape, visual and cumulative effects. Should the Council be
minded not to object, the Landscape Adviser has recommended that the following
conditions be submitted to the Energy Consents Unit: 
Page 48

Page 49

• The permanent loss of woodlands with biodiversity and landscape value (not just
Irreplaceable Habitats) along the route should be fully considered in the
calculation of compensatory planting. A greater area of woodland than that
removed should be planted to more adequately compensate for the loss of
woodland with greater biodiversity value in accordance with the objectives of the
Moray Woodland and Forestry Strategy. Compensatory planting proposals
should be agreed with the Planning Authority and Scottish Forestry. 
• The proposed landscape mitigation set out in Appendix 7.6 and the increase of
the Operational Corridor (OC) to 120m in the western part of Ordiequish Wood. 
• More extensive planting of trees, hedgerows and woodlands should be
undertaken outside the OC to help screen the proposed transmission line from
roads, footpaths and dispersed residential properties who will be most affected
by views of the proposed line. 
Biodiversity
(NPF4 Policy 3; MLDP EP2) 
NPF4 Policy 3 and MLDP Policy EP2 requires development proposals to contribute to
the enhancement of biodiversity, including where relevant, restoring degraded habitats,
and building and strengthening nature networks and the connections between them.
NPF4 Policy 3 (b) requires ‘national or major’ development to demonstrate how the
proposal will conserve, restore and enhance biodiversity, including nature networks so
they are in a demonstrably better state than without intervention. Moray published its
proposed Moray Nature Network which the proposal will cross/impact. 
Conclusion 
Whilst the proposal would result in significant landscape and visual impacts across the
region, including on designated landscapes, the development’s role as a nationally
important strategic development and its contribution to the electricity grid and Net Zero
targets are acknowledged, subject to the conditions set out by the Landscape Adviser. 
The proposed Kellas Alternative Arrangement should be avoided as this will result in
significant adverse landscape and visual effects, including significant cumulative
effects. 
Transportation – The information submitted for the application establishes the
principles of access to some 7 sections of cable route in Moray to enable construction
of the new overhead cable towers and their associated foundations, access tracks,
associated sub-stations and for the eventual stringing of the cables. There will also be
forestry extraction associated with the provision of the new overhead cables along with
works near ‘Altonside’ Orton, Orbliston, the A95 just to the east of Keith Cemetery, and
‘Drum Farm’ Keith where existing overhead cables will be improved/realigned. 
The proposed access points presented in the Transport Assessment have been
superseded by those included in the EIA. This is due to further development of the
project since the Transport Assessment was completed. As the design and
construction plans for the proposed overhead cables progresses, there will be further
amendments to the access proposals along the corridor – in particular seeking where
Page 49

Page 50

possible to avoid the use of unclassified roads where there are constraints, and to avoid
larger construction vehicles passing sensitive locations such as schools. 
Should consent be granted, the applicant has committed to working closely with each
Roads Authority to ensure that access points are located in the optimum location and
built to the required standard. It is anticipated that some access points with be
upgrades of existing accesses, new permanent accesses (which will support the future
maintenance of the overhead cables and towers) and temporary accesses. 
The development would take place in a phased manner, with work on some sections of
the route taking place concurrently. Whilst a framework Construction Traffic
Management Plan has been submitted as part of the application, a full Construction
Traffic Management Plan will be required for each section of the route. A Section 96
Agreement and associated Road Bond will also be required for the proposed
development covering the construction period for each Section of the cables (covering
wear and tear of public roads). 
The majority of construction vehicles will be standard HGVs and workers vehicles.
However there will be abnormal loads required to access each section – a crane to
erect the towers and for the delivery of the (heavy) cable drums. The applicant has
undertaken initial assessments of the routes where the abnormal loads are required to
use the public road and has identified ‘pinch points’ and locations where improvement
to and the upgrading of the public road may be required. Further assessment work will
be undertaken as the project progresses, should planning permission be granted. 
Conditions are therefore recommended to enable the submission of, and agreement to,
the detailed information required to ensure that safe and suitable accesses and, where
required, improvements to the public road on the routes to be used for construction
traffic are provided in advance works taking place on any particular phase of the
development. 
Outdoor Access and Countryside Officer – Note that paths at Meikle Balloch and
Newmill were missing from the supporting information, and highlight several key
considerations relating to rights of way, core paths and outdoor access, and outline how
this project presents a positive opportunity to enhance local routes and support
communities: 
1. Protection of Rights of Way, Core Paths and Outdoor Access
The proposed route intersects areas with established rights of way, designated core
paths and important informal access networks used by residents, land managers, and
visitors. These paths provide essential links between communities, support local
recreation, and form part of wider regional access networks.
It is therefore vital that:
• Existing rights of way and core paths are safeguarded during construction and
operation, with clear commitments to avoid severance or long-term obstruction.
• Any temporary closures are minimised, clearly signposted, and accompanied by
safe, well-designed alternative routes in cooperation with Moray Council.
Page 50

Page 51

• The Scottish Outdoor Access Code is fully adhered to throughout the project
lifecycle. 
2. Enhancing the Access Network as Part of the Development
While the project presents challenges, it also offers a significant opportunity to secure
long-term benefits for local access and community connectivity. Infrastructure works of
this scale can deliver added value through:
• Upgrading existing core paths or rights of way that require resurfacing, drainage
improvement or widening.
• Creating new off-road links where communities currently rely on narrow or
unsafe roadside walking routes.
• Supporting multi-use paths that benefit walkers, cyclists, horse riders and
mobility-impaired users.
• Introducing landscape and access improvements around tower sites,
substations, or diversion routes that remain in place post-construction.      
These enhancements would strengthen local networks, encourage outdoor recreation,
improve health and wellbeing outcomes, and contribute to sustainable travel options. 
3. Partnership Working with Communities
Close dialogue with communities, access groups, landowners and local authorities
should continue throughout the planning and delivery phases. By engaging early and
meaningfully, the developer can:
• Identify priority routes for improvement,
• Understand local access pressures or needs, and
• Co-design solutions that leave a positive legacy for the host communities.
Where appropriate, community benefit funding or partnership initiatives could help
maintain or further develop routes over the long term. 
Moray Flood Risk Management – No objections, informative notes provided advising
that towers located within flood plains are susceptible to the accumulation of debris
during flood events. It is strongly recommended that any debris be cleared as soon as it
is safe to do so following such events. Failure to remove debris promptly may result in
increased flood risk due to obstruction of natural water flow across the flood plain. 
Additionally, large floating debris poses a significant risk of structural damage to towers
during flooding. Appropriate maintenance and monitoring procedures should be
implemented to mitigate these risks and ensure the resilience of infrastructure within
flood-prone areas. 
Aberdeenshire Council Archaeology – Information submitted in respect of
archaeology is acceptable, and mitigation measures proposed are acceptable.
Condition recommended in respect of provision of Written Scheme of Investigation and
any Post-excavation Research Design. Any compensatory planting should take account
of the historic environment and following best practice in terms of avoiding damage to
heritage assets. Informative also recommended in respect of delivery of public benefit. 
Developer Obligations – No obligations sought.
Page 51

Page 52

7. REPRESENTATIONS 
Third party representations are submitted to the ECU for the consideration in dealing
with section 37 applications. 
8. RELEVANT POLICIES AND GUIDANCE 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Police 3 - Biodiversity
Policy 4 - Natural places
Policy 5 - Soils
Policy 6 - Forestry, woodland and trees
Policy 7 - Historic assets and places
Policy 11 - Energy
Policy 12 - Zero waste
Policy 13 - Sustainable transport
Policy 14 - Design, quality and place
Policy 18 - Infrastructure first
Policy 22 - Flood risk and water management
Policy 23 - Health and safety
Policy 25 - Community wealth building
Policy 29 - Rural development 
National Development 3 – Strategic Renewable Electricity Generation and Transmission
Infrastructure 
Moray Local Development Plan 2020 
PP2 Sustainable Economic Growth
PP3 Infrastructure and Services
DP1 Development Principles
EP1 Natural Heritage Designations
EP2 Biodiversity
EP3 Special Landscape Areas
EP4 Countryside Around Towns
EP7 Forestry Woodland and Trees
EP8 Historic Environment
EP10 Listed Buildings
EP11 Battlefields, Gardens and Designed
EP12 Management and Enhancement Water
EP13 Foul Drainage
EP14 Pollution Contamination Hazards
EP15 MOD Safeguarding
Page 52

Page 53

Scottish Climate and Energy Policies and Legislation 
The Scottish Energy Strategy (2017)
The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
CCC Report to Scottish Parliament – Progress in reducing emissions in Scotland (March
2024)
The Climate Change (Emission Reduction Targets) (Scotland) Act 2024
The Draft Energy Strategy & Just Transition Plan
The Green Industrial Strategy
CCC Report, Scotland’s Carbon Budgets, Advice for the Scottish Government 
9. BACKGROUND 
9.1. This proposal seeks consent under section 37 of the 1989 Electricity Act and
also a direction under section 57(2) of the Town and Country Planning
(Scotland) Act 1997 as amended for the development to be deemed to be
granted. 
9.2. As Moray Council acts as a consultee in the section 37 process, certain matters
included in the Observations section may be evaluated differently than if they
were part of a planning application for which Moray Council is the determining
authority. Areas such as aviation impacts, impacts on ecology and ornithology,
and effects on the water environment will be addressed by relevant regulatory
bodies and specialist consultees such as SEPA and NatureScot, who are
consulted by and report directly to the ECU. Consequently, the Council’s
involvement in particular considerations will be limited where the ECU consults
directly with organisations best qualified to address specific areas of
expertise/interest. 
9.3. Environmental Impact Assessment 
The proposal is a development which requires Environmental Impact
Assessment (EIA) under schedule 1 of The Electricity Works (Environmental
Impact Assessment) (Scotland) Regulations 2017 (the EIA Regulations). To
inform the scope of the assessment, the applicant submitted a scoping opinion
request under regulation 12 to Scottish Ministers on 26 June 2024, who
consulted Moray Council on this as an interested party. Officers responded on
22 August 2024 under delegated powers, indicating broad agreement on the
scope and approach to the EIA as outlined in the request. Scottish Ministers
adopted a scoping opinion on 2 October 2024 which has been used to inform
the EIA Report that accompanies this proposal. 
Page 53

Page 54

9.4. The EIA Report comprises the following: 
• Volume 1 – Non-Technical Summary
• Volume 2 – Main Report
• Chapter 1 – Introduction and Background
• Chapter 2 – Project Need
• Chapter 3 – Project Description
• Chapter 4 – The Routeing Process and Alternatives
• Chapter 5 – EIA Process and Methodology
• Chapter 6 – Scope and Consultation
• Chapter 7 – Landscape and Visual
• Chapter 8 – Ecology
• Chapter 9 – Ornithology
• Chapter 10 – Water and Geological Environment
• Chapter 11 – Cultural Heritage
• Chapter 12 – Forestry
• Chapter 13 – Transport
• Chapter 14 – Recreation and Tourism
• Chapter 15 – Noise and Vibration
• Chapter 16 – Cumulative Assessment
• Chapter 17 – Summary of Effects
• Chapter 18 – Schedule of Mitigation
• Volume 3 – Figures for chapters
• Volume 4 – Visualisations for Chapters 7 (Landscape and Visual)
and 11 (Cultural Heritage)
• Volume 5 – Appendices 
Matters not considered within the scope of the EIA have been addressed via
separate reports submitted with the application, including: 
• Aviation Risk Assessment
• Electric and Magnetic Field Study Report
• Habitat Regulations Appraisal
• Planning Statement
• Pre-Application Consultation Report
• Socio-Economic Report 
9.5. Public Consultation
Although not a statutory requirement under the Electricity Act 1989, the
applicant voluntarily undertook a Pre-Application Consultation (PAC) process in
Page 54

Page 55

line with Scottish Government Good Practice Guidance, with an aim of early and
meaningful engagement with communities and stakeholders potentially
affected by the development. A PAC Report has accompanied this application
outlining the consultation undertaken. 
9.6. The PAC Report notes the consultation process was multi-staged, beginning
with corridor, route, and refined route consultations, followed by two rounds of
formal PAC events, and an additional round focused on design changes after the
removal of the proposed Blackhillock (Coachford) substation. The process
sought to ensure that feedback from stakeholders, statutory consultees, and
the public was gathered, considered, and, where possible, incorporated into the
project design. Events were held in person and consultation materials were
made available online. 
9.7. Key themes raised during the consultations included concerns about the visual
and environmental impact of the OHL, property values and compensation, the
cumulative effect of multiple infrastructure projects, and preferences for
underground or subsea cabling. Health concerns, particularly regarding electric
and magnetic fields, and the impact on local biodiversity and ancient woodland
were also raised. The applicant states they responded by explaining the
technical, economic, and regulatory constraints, outlining mitigation measures,
and committing to biodiversity net gain and environmental best practice. The
project was revised in response to feedback where feasible, balancing
stakeholder views with technical and practical considerations. 
9.8. Consultation events in Moray were held in Dallas, Fochabers and Keith, with
details publicised through local press, social media, direct mail and the project
website. Printed materials, information boards, 3D visualisations, and
consultation booklets were made available at these events, and feedback was
collected in person, online, and in writing. A further event was held in Keith in
June 2025 following removal of the Blackhillock (Coachford) substation and
subsequent amendments to the OHL route in this area. 
9.9. In addition to public events, the applicant engaged directly with the Council (via
the major pre-application advice service) and other statutory consultees
through meetings and correspondence. The PAC Report states that all feedback
was documented, analysed, and used to inform the final alignment and design
of the project, with updates and responses provided to the community
throughout the process.
Page 55

Page 56

9.10. Need for Proposal
Whilst the principle of the proposal is considered under planning policy as
outlined below under Observations, the EIA Report (Chapter 2) describes the
need for the proposal from a technical, economic and legislative perspective. It
notes the need for the proposal has been assessed through national system
planning exercises and regulatory frameworks. The National Energy System
Operator (NESO) and Ofgem have both identified the requirement for significant
upgrades to the transmission network to accommodate the forecasted growth
in renewable electricity, particularly from offshore wind. Studies such as the
Pathway to 2030 Holistic Network Design and subsequent reviews have
confirmed that further reinforcement of the electricity transmission network is
necessary to connect new, large-scale renewable energy sources in Scotland. 
9.11. Regulatory approval has been granted under Ofgem’s Accelerated Strategic
Transmission Investment (ASTI) framework, which supports the economic case
for delivering qualifying infrastructure projects. Ofgem has emphasised the
benefits of timely delivery of new transmission infrastructure for consumers,
including improved resilience, security of supply, and decarbonisation of the
energy sector. The applicant states delays in providing these upgrades could
result in increased constraints and higher costs for consumers. 
9.12. As the transmission licence holder for the north of Scotland, the applicant is
legally required to develop and maintain an efficient, co-ordinated, and
economical system of electricity transmission. The costs of development,
construction, and operation are ultimately recovered from end consumers
through electricity bills, making economic efficiency a key consideration. The
design of the proposed development has therefore been planned to ensure it
meets statutory duties and regulatory requirements, while supporting the
transition to a net zero energy system. 
9.13. Alternatives
Under the EIA Regulations (regulation 5(2)(d) and schedule 4(2)), the applicant
has to consider reasonable alternatives to a proposal, such as design,
technology, location, size and scale. 
9.14. Chapter 4 of the EIA Report outlines the routeing process undertaken by the
applicant, along with consideration of alternatives to the proposal subject to the
section 37 application. The process was guided by statutory duties, technical
standards, and environmental regulations, with the aim of balancing the need
Page 56

Page 57

for an economical transmission system while minimising impacts on natural
beauty, heritage, and local communities. 
9.15. The alternatives considered included the ‘do-nothing’ scenario, underground
cable options, and subsea cable options. The ‘do-nothing’ scenario was
discounted as it would not meet the UK’s and Scotland’s Net Zero targets or
support the required growth in renewable energy generation. 
9.16. The use of underground cables and subsea cables was also assessed. These
were found to be significantly more expensive (up to 4.5 times the cost of OHLs)
and presented technical and operational challenges, especially at the required
400 kV voltage. Subsea cables, while beneficial for long-distance transmission,
would require multiple converter stations and offer less capacity than OHLs,
with higher costs and greater land take. Both alternatives would introduce
additional environmental impacts, such as disruption to peatlands, agricultural
land, and watercourses, and were therefore not considered reasonable options. 
9.17. The routeing process itself was divided into several stages: corridor selection,
route selection, and alignment selection. Each stage involved the use of digital
mapping, environmental constraints analysis, and public consultation. In the
Moray portion of the OHL, Chapter 4 notes that attention was paid to avoiding
areas of high landscape value, designated sites, and residential clusters. The
preferred corridors and routes were chosen to minimise visual and ecological
impacts, with adjustments made following stakeholder and public feedback.
For example, routes were refined to avoid ancient woodland, reduce proximity to
settlements, and minimise effects on sensitive habitats such as peatlands and
water supplies. 
9.18. During the alignment selection stage, further refinements were made to address
concerns raised by landowners and statutory consultees. The alignment was
adjusted to reduce impacts on farming and forestry operations, avoid notable
trees/woodland, and maintain separation from sensitive receptors such as
Scheduled Monuments and Sites of Special Scientific Interest (SSSIs). The
proposal also incorporates technical solutions such as floating tracks over
peatland and piled foundations in areas of deep peat, to further mitigate
environmental effects. 
9.19. Within Moray the Kellas Alternative Alignment is proposed, which would only be
constructed if the proposed Kellas Drum Wind Farm is consented. This
Page 57

Page 58

alternative has been assessed for its technical, cost, and environmental merits,
with the preferred alignment chosen for its shorter, more direct route and
reduced landscape and visual impacts. The application as submitted proposes
that should the wind farm not be consented, the main proposed alignment
would be constructed instead. 
9.20. The information within the EIA Report concludes the proposed OHL route has
been established by balancing technical feasibility, cost, and need for
environmental protection. Alternatives such as underground and subsea cables
have been ruled out by the applicant due to cost, technical, and environmental
disadvantages. It reflects the consultation undertaken and refinement to
minimise impacts on local communities, sensitive habitats, and landscape
character, while ensuring the proposal’s objectives are met. 
10.          OBSERVATIONS
10.1. Officers have considered the proposal against National Planning Policy 4
(NPF4), the Moray Local Development Plan 2020 (MLDP) and material
considerations including national legislation on renewable energy and climate
policies and legislation as listed above under section 8. It is noted that the
Energy Strategy and Just Transition Plan is still at a draft stage. It should also be
noted that as the application is being considered under the Electricity Act 1989,
rather than the Town and Country Planning (Scotland) Act 1997, the
development plan does not have primacy under section 25 of the 1997 Act in
the same way a planning application would. 
10.2. Schedule 9 (2) of the Electricity Act 1989 requires those determining proposals
under the Act, including section 37, to ‘have regard to the desirability of
preserving natural beauty, of conserving flora, fauna and geological or
physiographical features of special interest and of protecting sites, buildings
and objects of architectural, historic or archaeological interest’ and ‘do what he
reasonably can to mitigate any effect which the proposals would have on the
natural beauty of the countryside or on any such flora, fauna, features, sites,
buildings or objects.’ 
10.3. Principle of Proposal
NPF4 is Scotland’s national spatial strategy and alongside local development
plans is a statutory part of the development plan, setting out priorities for
Scotland to 2045. It integrates a national spatial strategy with planning policies,
aiming to deliver sustainable, liveable and productive places while addressing
the climate and nature crises. It places achievement of net zero emissions by
Page 58

Page 59

2045 at its core, alongside economic transformation and community wealth
building. 
10.4. “National Developments” sit at the top of the Hierarchy of Development,
comprising developments that are designated in NPF4 and considered to be of
national importance. Annexe A of NPF4 states that “their designation means
that the principle of the development does not need to be agreed in later
consenting processes”. 
10.5. All new and/or upgraded on and offshore high voltage electricity transmission
lines, cables and interconnectors of 132kV or more fall within the definition of
national development in NPF4 (Annexe B, National Development 3 - Strategic
Renewable Electricity Generation and Transmission Infrastructure). 
10.6. NPF4 also defines ‘all forms of renewable, low-carbon and zero emission
technologies for electricity generation and distribution and transmission
electricity grid networks and primary sub stations’ as essential infrastructure. 
10.7. NPF4 Policy 1 (Tackling the climate and nature crises) states that significant
weight must be attached to the global climate and nature crisis. It aims seeks to
reduce emissions and supports development that addresses these goals.
Transmission infrastructure for renewable energy is one such development and
therefore significant weight must be attached to its contribution toward
emissions reductions. Similarly, NPF4 Policy 2 (Climate change and adaptation)
seeks to encourage, promote and facilitate development that minimises
emissions and adapts to the current and future impacts of climate change. This
can directly be linked to other wider objectives of NPF4 in creating sustainable
places and the production and transmission of clean energy is part of the
spatial strategy for the north of Scotland. 
10.8. Policy 11 of NPF4 supports all proposals for renewable, low-carbon, and zero-
emission technologies—including wind farms and related grid infrastructure—
alongside the climate-focused support in Policy 1. Whilst it identifies the
principle of National Developments as being established, it also requires them
to be assessed at the project level to ensure compliance with statutory
requirements outlined in Annex 1 of NPF4. This includes alignment with the
Development Plan, which incorporates NPF4 and MLDP. 
10.9. In terms of land use designations in the MLDP, the proposal takes in The Spey
Valley Special Landscape Area. Under associated MLDP Policy EP3, uses are
restricted in rural areas (i.e. outwith settlements) to limited uses, however there
is an allowance for nationally significant infrastructure development identified
in NPF4. The general principle of this proposal is therefore not at odds with EP3,
Page 59

Page 60

though consideration is given to the landscape and visual impact of the
proposal on the SLA below. 
10.10. The proposal also passes through part of the Keith Countryside Around Towns
(CAT) designation of the MLDP. MLDP Policy EP4 restricts development
proposals to limited development types in order to prevent sprawl of
settlements into the surrounding countryside. In this case, there is no specific
allowance for electricity infrastructure, however as NPF4 establishes the
principle of national developments, it is considered this outweighs the policy
requirements of MLDP Policy EP4. 
10.11. Accordingly, the principle of this development is established and acceptable
under planning policy, though consideration will be given to various aspects of
this proposal as per the following headings. 
10.12. Landscape and Visual Impacts
NPF4 Policy 11 states that project design and mitigation must demonstrate how
the various impacts of renewable energy developments are addressed and
these are listed in part (e) of the policy. This includes enabling works including
grid transmission and distribution infrastructure. Part (e)(ii) notes that
significant landscape and visual impacts, recognising that such impacts are to
be expected for some forms of renewable energy. Where impacts are localised
and/or appropriate design mitigation has been applied, they will generally be
considered to be acceptable. 
10.13. NPF4 Policy 4 requires that development proposals should not have
unacceptable impacts on the natural environment. For local landscape
designations (including Special Landscape Areas (SLAs) significant adverse
effects must be clearly outweighed by social, environmental, or economic
benefits of at least local importance. 
10.14. The applicant has undertaken a comprehensive Landscape and Visual Impact
Assessment (LVIA) as part of the EIAR, detailed in Chapter 7. This assessment
evaluates the potential effects of the proposed development on landscape
character and visual amenity, considering both the construction and
operational phases. The LVIA forms a key component of the EIA process,
ensuring that the likely landscape and visual impacts are fully identified,
assessed, and, where possible, mitigated within the project design. The Moray
section of the LVIA has been reviewed by a Landscape Architect appointed by
the Council, and has found it to be thorough. 
Page 60

Page 61

10.15. As noted above, a range of route options were appraised by the applicant with
input from consultees prior to the final alignment being selected. While it is
evident that the proposed route for the transmission line has sought to minimise
views from settlements and effects on designated landscapes where possible
(being located adjacent to existing OHLs in some sections of the route and
being aligned through commercial forestry in many areas) significant adverse
landscape and visual effects will arise particularly close to the route of the OHL
due to the nature and scale of the infrastructure proposed. 
10.16. Within Moray, the proposed OHL traverses a variety of landscapes, including the
broad, well-wooded valley of the River Spey, upland farmland, and several
designated areas. The LVIA has scoped in assessment of the proposal on two
SLAs in Moray: the Findhorn Valley and the Wooded Estates SLA, and the Spey
Valley SLA, the OHL passing through the latter. These areas are designated in
the MLDP as a result of their scenic qualities, historic estates, and recreational
opportunities. 
10.17. The LVIA identified that the most significant effects in Moray would occur where
the proposed OHL crosses the Spey Valley SLA and areas of upland moorland
and forestry. The introduction of tall steel lattice towers and the associated
operational corridor (OC) would result in the permanent loss of woodland and
changes to the visual character of the landscape. In the Spey Valley, the
presence of multiple OHLs, including the new proposal, would create a
cumulative “wirescaping” effect, further detracting from the visual amenity and
perceptual qualities of the area. The felling of large areas of coniferous
woodland, particularly on Ordiequish Hill, would be highly prominent in views
from local roads, the River Spey, and key recreational routes such as the
Speyside Way. The most significant adverse landscape and visual effects are
likely to occur in the following parts of the proposed OHL: 
10.18. Section 12 - Dava Way: Effects on people using the Dava Way would be
significant and adverse. The proposed development would contribute to a
complex array of infrastructure in this area including an existing OHL, the
operational Hill of Glaschyle wind farm and the consented Clash Gour wind
farm resulting in significant adverse combined cumulative landscape and visual
effects. The larger towers of the proposed development and their proximity to
this recreational route increases the magnitude of effect on character and
views. It is recommended that off-site native woodland should be established
to the south of the proposed development and close to the Dava Way, possibly
focussed on the lower slopes of Cairn Eney and between the Dava Way and the
water course to the east of this recreational route. 
Page 61

Page 62

10.19. Section 13 - Glen Lossie: This small-scale complex valley landform is heavily
wooded in places and not well frequented but nonetheless significant adverse
effects on character will occur with these accentuated by the consented Clash
Gour wind farm. The width of the OC should be increased where the line
crosses the valley and native riparian planting and open space should be
extended in this area. There are opportunities for compensatory native
woodland planting to be accommodated in the vicinity of the River Lossie
between Dallas and the proposed development and along the minor road
between Dallas and Knockando as this would have biodiversity benefits as well
as increase screening for visual receptors.
10.20. Section 14 - Kellas area: The Kellas Alternative Alignment would be aligned
closer to the smaller existing overhead line and to the settled Lossie valley. It
would necessitate additional removal of 11.84ha of commercial woodland and
2.41ha of native woodland. The removal of lines of trees and hedgerows is also
noted as being required to accommodate this alternative alignment in Appendix
8.3 and the LVIA concludes increased adverse effects (significant) on
residential and recreational receptors (EIA Report paragraphs 7.8.28 and
7.8.29). The preferred route alignment would have minimal effects on
residential properties, roads and recreational routes in the Kellas area. The
alternative alignment in contrast would result in significant adverse landscape
and visual effects (including significant cumulative effects with the Kellas Drum
wind farm which is assumed to be constructed if the alternative route is
selected). It is strongly recommended that the Kellas Alternative Alignment is
avoided. 
10.21. Section 15 - Glen Rothes: Views from the A941 where the large towers of the
OHL would be prominent seen in the confines of this narrow and deeply incised
glen. The proposed wind farms of Teindland and Blackhills, if constructed,
would additionally result in significant adverse cumulative effects with the
proposed development in this area. Off-site woodland and tree planting along
the A941 would help screen views from the A941. 
10.22. Sections 16 and 17 - The Spey valley crossing: Where the proposed
development would be seen in close proximity to two existing smaller OHLs and
with landscape and visual effects further exacerbated by the complexity of
diamond crossings where OHLs intersect. The magnitude of effect on
landscape character, views and on the special qualities of the Spey Valley SLA
in this area would be of the greatest severity along the route of the proposed
development in Moray. The only mitigation that would be effective here would
be undergrounding the line with terminal towers sited within forestry in
Altonside and Ordiequish Forest to minimise landscape and visual impacts.
Moray Council requested at the Pre-App meeting 25/7/24 that alternative
measures to OHLs should be considered through sensitive landscapes such as
SLAs (EIA Report Table 7.1). 
Page 62

Page 63

10.23. Section 19 - Keith/Newmill area: The proposed development would
exacerbate the complexity of converging transmission lines and substation
development around the eastern fringes of Keith. The proposed OHL would
particularly affect character and views where it is aligned across the narrow
valley of the Burn of Drum and steep farmed and wooded slopes east and
south-east of Keith with angle towers and diamond crossings contributing to
major adverse effects. It is recommended that detailed proposals are drawn up
by the Applicant for mitigation and enhancement planting in this area. 
10.24. There would be significant adverse landscape and visual effects during the
construction phase associated with the setting up of temporary working areas,
construction scaffolds, the widening of public roads (including removal of
roadside trees and hedgerows), felling of woodlands and removal of other
vegetation generally within a 90m wide corridor and the construction of access
tracks, bridges and culverts to facilitate access along corridor. There would also
be activity and noise during the construction phase which would significantly
impact on the perceptual qualities of the landscape, particularly affecting more
tranquil and natural landscapes along the route. 
10.25. During the operational phase, the permanent loss of woodlands along the route
corridor and the introduction of tall transmission line towers and wires would
result in permanent significant adverse landscape and visual effects. These
effects would generally extend around 1km either side of the proposed
transmission line but would increase in some more open areas and/or where
the line is seen against the sky, where multiple towers appear close together in
long views or where the angle of route changes (necessitating heavy appearing
angle towers). The crossing of existing OHLs in the Spey Valley and Keith area
will be particularly intrusive due to the concentration of intersecting towers and
lines at these points. 
10.26. There would be significant adverse effects affecting the visual amenity of many
residential properties lying close to the route of the proposed transmission line.
Residential Receptor Groups are considered in the LVIA. Major adverse effects
are likely to occur on properties with more open views lying within around a
kilometre of the line where it is aligned on the northern slopes of Brown Muir to
the eastern side of the Spey crossing and where it is aligned south-east of the
Wood of Ordiequish to Keith. Significant adverse cumulative effects would
occur around Keith where the proposed development would further
compromise the natural landscape setting of the town and would be seen in
conjunction with a great many converging OHLs and substation development. 
10.27. Significant adverse cumulative landscape and visual effects will additionally
occur in the western part of the route where the consented Clash Gour wind
Page 63

Page 64

farm would be seen from the Dava Way (the principal recreational facility in this
area). They would also occur in the Kellas area should the Kellas Drum wind
farm be consented and the Kellas Alternative Alignment be adopted. Significant
cumulative effects would also occur on Glen Rothes and the Spey valley
(including on The Spey Valley SLA) where the proposed development would be
sited in close proximity to the proposed Teindland and Blackhills wind farms. 
10.28. This proposal is predicted to have significant adverse effects on both the
landscape character and visual amenity of the area surrounding the proposed
OHL route, particularly in designated and sensitive locations including The Spey
Valley SLA. While mitigation measures are proposed, they will not fully address
the scale of change introduced by the development. The most pronounced
impacts will be experienced during construction and in the early years of
operation, with some reduction in effect as woodland re-establishes over time.
However, the introduction of new, prominent electricity transmission
infrastructure, larger than any pylons currently in Moray, will inevitably result in
lasting changes to the landscape and views of the areas surrounding the OHL. 
10.29. NPF4 Policy 11 should be given the greatest consideration regarding landscape
and visual issues, as it represents the most recently adopted policy on this
matter. The primary focus is on part (e)(ii), which stipulates that project design
and mitigation measures must clearly demonstrate how significant landscape
and visual impacts have been addressed, acknowledging that such impacts
may be inherent to certain types of renewable energy development. When these
impacts are localised and/or suitable design mitigation has been implemented,
they will typically be regarded as acceptable. NPF4 also places substantial
weight on the contribution of such proposals to renewable energy targets and
climate objectives. 
10.30. Due to its span, this proposal will have a notable landscape and visual impact
throughout for a 59km span across Moray. While these effects will mainly be
localised to areas adjacent to the OHL – as accepted by NPF4 Policy 11 - the
project's considerable length means this will be across the region.
Nevertheless, such wide-ranging impacts are unavoidable given the scale of the
proposal. 
10.31. Cultural Heritage
NPF4 Policy 7 (Historic Assets and Places) and MLDP Policy EP8 (Historic
Environment) seeks to protect historic and archaeological assets. MLDP Policy
EP10 (Listed Buildings) states that development proposals will be refused where
they would have a detrimental effect on the character, integrity or setting of a
Page 64

Page 65

listed building. Structures such as pylon towers have the potential to affect the
setting of listed buildings other cultural heritage assets some distance away. 
10.32. Chapter 11 of the EIA Report contains evaluation of the impact of the proposed
OHL route on cultural heritage assets. The scope of the assessment was carried
out in consultation with Aberdeenshire Council Archaeology Service (on behalf
of Moray Council), who emphasised the need to consider both designated and
non-designated heritage assets, as well as the importance of compensatory
planting and targeted walkover surveys, particularly in wooded areas. The
chapter confirms that these recommendations were incorporated into the
assessment and mitigation strategy. 
10.33. Within Moray, the OHL route and its surrounding area contains a number of
heritage assets: both designated (such as listed buildings and Gardens and
Designed Landscapes) and non-designated (including agricultural features and
other archaeological remains). The assessment identified that construction
activities, especially those related to tower compounds and access tracks, have
the potential to cause direct physical impacts on some non-designated heritage
assets. For example, the loss or partial loss of certain farmsteads, trackways,
and enclosures is anticipated, with the significance of these effects ranging
from slight to moderate adverse prior to mitigation. However, the report outlines
a mitigation strategy which includes archaeological walkovers, demarcation and
avoidance, earthwork surveys, and historic building recording, all to be agreed
with the Council. 
10.34. For designated heritage assets in Moray, the assessment concludes that direct
physical impacts during construction will be avoided. However, some assets
may experience changes within their setting due to the introduction of new
overhead line infrastructure. These impacts are assessed as slight adverse and
not significant, due to factors such as distance, existing screening, and the
presence of other infrastructure. 
10.35. The report also considers cumulative effects with other developments in the
area and concludes that, for Moray, there are no significant cumulative impacts
anticipated. This is due to either the absence of shared receptors or the
implementation of effective mitigation strategies. The residual effects, after
mitigation, are generally assessed as slight adverse and not significant for the
majority of heritage assets in Moray. 
Page 65

Page 66

10.36. The only exception is the loss of non-designated heritage assets where
moderate adverse effects remain due to the inability to avoid certain assets
entirely, namely: 
• Cairn Duhie (ND95) – Boundary Stone (loss of heritage asset)
• Fairy Knowe (ND135)  – Possible Dun (loss of heritage asset)
• Glen Latterach (ND140) – Spring (loss of heritage asset)
• Mill Our (ND148) – Trackway (partial loss of heritage asset)
• Netherglen (ND178) – Standing Stone (loss of heritage asset)
• Comprehensive excavation, recording, and publication are proposed to
ensure preservation by record. 
10.37. Historic Environment Scotland have responded to the ECU, objecting to the
proposal (at the time of writing this report) due to impacts on designated
heritage assets in the Highland Council area. However, no issues were identified
in Moray in terms of the impact of the proposed OHL on the following: 
• Designed Gardens and Landscapes – Regulas, Blackhills House, Gordon
Castle.
• Category A Listed Buildings – Dunphail House, Edinkillie House, Kellas
House, Pittensair, Mill of Towie.
• Aberdeenshire Council Archaeology Service (on behalf of Moray Council)
have not objected to the proposal, but recommend conditions requiring
archaeological mitigation to be undertaken. 
10.38. The overall implications of the proposal on cultural heritage in Moray are that,
while some non-designated heritage assets may be directly affected by
construction, the overall approach proposed minimises impacts and provides
suitable mitigation. Subject to conditions as recommended by Aberdeenshire
Council Archaeology Service, the proposal is therefore considered to comply
with NPF4 Policy 7 (Historic Assets and Places) and MLDP Policy EP8 (Historic
Environment) as well as MLDP Policy EP10 (Listed Buildings). 
10.39. Noise and Amenity
NPF4 Policy 11 (e) (i) requires noise impacts of renewable energy development
to be mitigated as part of the design of a development. This is also the case for
NPF Policy 23 (Health and Safety) and MLDP Policy EP14 (Pollution,
Contamination and Hazards), both of which require noise generated from
proposed developments to be an acceptable level or suitably mitigated. Where
Page 66

Page 67

this is not the case, development will not be supported. In this instance,
Chapter 15 of the EIA Report evaluates noise and vibration from construction
and operation of the proposed OHL. In summary it finds that construction
vibration and operational noise are not significant, whilst construction related
noise would be significant without mitigation. In order to mitigate the impacts of
the proposal on noise sensitive receptors, a Construction Noise Management
Plan is proposed by the applicant. Where these are factored into the
assessment, the conclusion is there is no significant residual effect. 
10.40. In reviewing the submission, the Environmental Health service have raised no
objections, but have requested a condition be placed requiring a Construction
Environment Management Plan to be agreed with the Council in respect of
noise, vibration, dust and artificial lighting. Subject to this condition, the
proposal is considered to comply with the aforementioned policy 
10.41. Private Water Supplies
A Private Water Supply (PWS) Risk Assessment undertaken in support of
Chapter 10 of the EIA Report has considered the impact of the proposal on
private water supplies on and surrounding the OHL route. This has identified
that the proposal could have a moderate or major significant impact on 22 PWS
in Moray. As such, further assessment is necessary to consider these impacts,
along with formation of suitable solutions and monitoring/alternative supplies
to be provided. In reviewing the proposal, the Council’s Environmental Health
service, responsible for PWS, have requested a condition be placed requiring a
Private Water Supply Management Plan and Private Water Supply Monitoring
Plan to be submitted, along with measures ensuring an adequate and
wholesome supply to those served by affected PWS as a result of construction
works. SEPA have also requested a condition requiring further information in
respect of PWS. The conditions as requested by Environmental Health will be
placed with any response raising no objection. 
10.42. Natural Environment
NPF4 Policies 1 and 2 adopt a broader perspective on the natural environment,
identifying carbon reduction as a key priority in addressing climate change.
Policy 1 recognises that ongoing environmental challenges are closely linked
with climate change and recommends that both issues be addressed
concurrently. The policy further emphasises the development of renewable
energy as an integral component of this approach. 
10.43. NPF4 Policy 3 (Biodiversity) and MLDP Policy EP2 (Biodiversity) however both
seek to enhance biodiversity, so not withstanding allowances made for energy
generation in upland areas elsewhere in NPF, efforts should still be made to
Page 67

Page 68

enhance the local biodiversity as a result of development. Of note, NatureScot
and RSPB will respond separately on aspects such as ornithology and
Groundwater dependent terrestrial ecosystems. 
10.44. NPF4 Policy 4 (Natural Places) and MLDP Policy EP1 (Natural Heritage
Designations) seek to ensure proposals do not have an adverse effect on
protected species. 
10.45. NPF4 Policy 11 (e) (ix) and MLDP Policy DP9 (a) (iii) and (b) (ii) require renewable
energy projects to ensure they do not have an adverse impact on ecology and
biodiversity. 
10.46. The scale of the proposal means it traverses a diverse ecological landscape
within Moray, including internationally, nationally, and locally designated sites, a
range of priority habitats, and areas supporting protected species. The
assessment of ecology impacts (in Chapter 8 of the EIA Report) has been
undertaken in accordance with best practice guidance and relevant legislation,
with a focus on minimising adverse ecological effects and securing biodiversity
net gain. 
10.47. The route passes close to or over several designated sites, notably the River
Spey Special Area of Conservation (SAC) and Site of Special Scientific Interest
(SSSI), as well as other SSSIs such as Mill Wood, Buinach and Glenlatterach,
and Coleburn Pasture. Ancient woodland and areas of blanket bog - both
considered irreplaceable habitats - are present within the zone of influence. The
project will result in the loss of some woodland including ancient woodland
(further considered under Woodland below) and areas of blanket bog, though
efforts have been made to avoid or minimise impacts where possible. The loss
of these habitats is considered significant due to their irreplaceable nature, but
mitigation and restoration measures are proposed, including woodland edge
planting and peatland restoration. 
10.48. Surveys undertaken have identified the presence or potential for a range of
protected species, including bats, badger, pine marten, red squirrel, otter, water
vole, wildcat, fish (notably Atlantic salmon), and freshwater pearl mussel. The
project will result in the loss or disturbance of some resting sites, setts, dreys,
and potential roosts, particularly through tree felling and construction activities.
The assessment applies a precautionary approach, recognising that undetected
features may be present. Mitigation includes pre-construction surveys, sensitive
Page 68

Page 69

timing of works, creation of compensatory habitats (such as artificial setts or
bat boxes), and strict adherence to species protection plans. 
10.49. The development oversails or is adjacent to several watercourses, including the
River Spey, which are of high ecological value. Construction activities pose risks
of sedimentation, pollution, and habitat fragmentation, potentially affecting
aquatic species such as salmon and freshwater pearl mussel. Mitigation
measures suggested by the applicant include best practice construction
methods, timing restrictions to avoid sensitive periods for fish, and the use of
species protection plans. Any impact on freshwater pearl mussel, given its
endangered status, is considered significant and must be avoided wherever
possible. 
10.50. A Biodiversity Net Gain (BNG) assessment has been undertaken, demonstrating
that while there will be a net loss of some habitats on-site (notably woodland
and hedgerows), there will be creation of scrub and grassland habitats. Off-site
habitat enhancement and creation are proposed to offset losses and achieve a
minimum 10% net gain in biodiversity, in line with policy requirements.
Restoration of temporarily affected habitats, such as peatland and grassland, is
also planned. 
10.51. The assessment considers cumulative effects with other developments in the
area. 
10.52. While the loss of irreplaceable habitats and impacts on certain species are
significant, the implementation of mitigation, restoration, and compensation
measures is expected to reduce residual effects to a level that is not significant
for most receptors, except for irreplaceable habitats and certain protected
species where effects remain significant at a local or regional scale. 
10.53. Considerations in respect of ecology are best considered by consultees such as
NatureScot and the RSPB. The proposal will have unavoidable but mitigated
impacts on designated sites, priority habitats, and protected species within
Moray. The approach prioritises avoidance, minimisation, and compensation,
with a strong emphasis on biodiversity net gain and long-term habitat
restoration. Ongoing monitoring and adaptive management are recommended
in the EIA Report to ensure the effectiveness of mitigation and to address any
unforeseen ecological effects during construction and operation. 
Page 69

Page 70

10.54. Conditions covering this are to recommended to ensure appropriate protection
and mitigation for ecology, as well as biodiversity enhancement is delivered as
part of this proposal, as well as potential linkages/enhancements to the Moray
Nature Network. This will also incorporate recommendations as suggested
under the Landscape and Visual Impact section of this report. 
10.55. It should be noted that, as the time of writing this report, NatureScot and RSPB
have objected to this proposal (as detailed in their consultation responses to
the ECU dated 18 November 2025) because of its potential impact on the
capercaillie population in the Darnaway and Lethen Special Protection Area,
which spans the Moray and Highland boundary north of the proposed OHL
route. Ultimately, it is for the ECU/Scottish Ministers to decide whether the
proposal complies with relevant planning policies. However, given NatureScot's
and RSPB’s objections, it would appear the proposal may conflict with planning
policies concerning ecology, protected species, and international designations.
Nevertheless, this is not seen as a reason for the Council itself to object, since
these parties are the most appropriate to address this issue through their
consultation responses. 
10.56. Flood Risk 
Planning policies at a national and local level generally presume against
development in areas at risk of flooding, however there are exceptions. Under
NPF4 Policy 22 (a)(i), development proposals at risk of flooding or in a flood risk
area will only be supported if they are for essential infrastructure where the
location is required for operational reasons. MLDP Policy EP12 takes a similar
position on development in areas at risk of flooding. There is however criteria set
out by SEPA which development accepted in flood risk areas should comply
with. This includes a requirement to not reduce the capacity of a floodplain as a
result of development. 
10.57. All but two of the pylons meet with the SEPA Standing Criteria on development
at risk from flooding, however two pylons at Dipple, adjacent to the River Spey
(pylon towers CB12-16A and CB14-1B) require building of foundations above
ground that will result in a loss of functional floodplain of the River Spey. A Flood
Risk Assessment (FRA) within the EIAR (Volume 5, Appendix 10-8) notes the
volume of water displaced by the tower foundations (300 m3 ) is minimal
compared to the size of the floodplain, and it is therefore considered to have an
inconsequential impact on the floodplain's capacity. The width of the floodplain
at this location is approximately 1 km, consisting predominantly of flat, open
farmland, as evident from the LiDAR imagery that has been undertaken as part
of the FRA. To estimate the area of the Spey floodplain in this area, the 200-year
fluvial flood extent has been clipped using the Boat o’ Brig as the upstream
Page 70

Page 71

extent and A96 Spey Bridge as the downstream extent. This area is
approximately 7 km2. SEPA flood map depth layers indicate most of this area
has a flood depth band of 0.3 - 1.0 m. This means the maximum capacity of the
floodplain is estimated to be 7,000,000 m3 , making the volume displaced by
towers CB12-16A and CB14-1B approximately 0.004% of the total floodplain
capacity. 
10.58. Moray Flood Risk Management has reviewed the proposal and raised no
objections, but has recommended informative notes to be included with any
consent in respect of flood risk. SEPA, in responding the ECU, have raised no
objections either, but this is subject to condition requiring compensatory
storage to be provided to mitigate the impact of any displaced flood waters as a
result of the land raising necessary to accommodate the two pylons at Dipple.
Subject to this condition, and others as recommended by SEPA, the proposal is
considered to be in accordance with NPF4 Policy 22 and MLDP Policy EP12. 
10.59. Access and Traffic
NPF4 Policy 13 (Sustainable Transport) and MLDP policies PP3 (Infrastructure
and Services) and DP1 (Development Principles) contain criteria which seek to
ensure the transport impact of a proposal is acceptable, with an emphasis of
minimising traffic generation and mitigating impacts on the existing transport
network. With specific reference to energy developments, NPF4 Policy 11 (e) (vi)
requires proposals to consider impacts on road traffic and the road network. 
10.60. Chapter 13 of the EIA Report considers the transport impacts associated with
the construction phase of the proposal. The supporting information submitted
considers baseline conditions, predicted construction traffic including
abnormal, and the effectiveness of proposed mitigation measures. 
10.61. Impacts on Moray cover a variety of public roads to be used to provide access to
construction areas, including the A96 trunk road, and the Council’s local road
network, of which many roads are rural, single-track routes with passing places.
Baseline traffic flows were established using a combination of automatic traffic
counters and Department for Transport (DfT) data, with additional consideration
given to accident records and the presence of sensitive receptors such as
schools, residential areas, and pedestrian/cycle facilities. 
10.62. During the peak construction period, a temporary but significant increase in
traffic volumes is predicted, particularly heavy goods vehicles (HGVs), on
Page 71

Page 72

several key routes in Moray. For example, on the A940, B9010, and B9103, daily
HGV movements are expected to rise substantially, with some links
experiencing increases well above 30% - the threshold at which further
assessment is required. However, even with these increases, the analysis
demonstrates that the existing road network has spare capacity, and the
temporary rise in traffic is not expected to result in significant congestion or
capacity issues. 
10.63. The assessment finds that, while there will be a noticeable increase in HGV and
overall vehicle movements, the impact on community severance (the perceived
division of communities by traffic) is generally minor and not significant. Most
affected roads are rural with low baseline flows and limited pedestrian activity.
In urban areas such as Forres and Elgin, where pedestrian facilities and
crossings are present, the impact is further mitigated. The effect on pedestrian
and cyclist amenity is also considered minor, as the temporary increase in
traffic does not double existing flows on most links, and the number of non-
motorised users is expected to remain low. 
10.64. A review of accident data for the Moray area indicates that the majority of roads
have accident rates below the national average, and there are no inherent safety
concerns that would be exacerbated by the construction traffic. All reported
accidents in recent years have been attributed to driver or pedestrian error
rather than road conditions. The temporary increase in HGVs is not expected to
materially worsen road safety, especially with the implementation of a
Construction Traffic Management Plan (CTMP). 
10.65. A range of embedded mitigation measures is proposed, including the
preparation and enforcement of a detailed CTMP, physical improvements to
access points and junctions, temporary signage, and restrictions on
construction traffic during sensitive periods (e.g. school times). No additional
mitigation is deemed necessary beyond these embedded measures, as the
assessment concludes that the residual effects will remain minor and not
significant. 
10.66. The assessment also considers the potential for cumulative impacts with other
consented or committed developments in the area, such as wind farms and grid
connections. Even when accounting for these additional sources of
construction traffic, the analysis finds that the road network retains sufficient
capacity, and cumulative effects are not expected to be significant.
Page 72

Page 73

10.67. In considering the proposal, the Transportation Manager notes the development
would take place in a phased manner, with work on some sections of the route
taking place concurrently. Whilst a framework CTMP has been submitted as part
of the application, a full CTMP will be required for each Section of the route. A
Section 96 Agreement and associated Road Bond will also be required for the
proposed development covering the construction period for each Section of the
cables. The majority of construction vehicles will be standard HGVs and workers
vehicles. However there will be abnormal loads required to access each section
– a crane to erect the towers and for the delivery of the (heavy) cable drums. The
applicant has undertaken initial assessments of the routes where the abnormal
loads are required to use the public road and has identified ‘pinch points’ and
locations where improvement to and the upgrading of the public road may be
required. Further assessment work will be undertaken as the project
progresses, should consent be granted and these matters are recommended to
be secured by conditions. 
10.68. Conditions requiring a detailed phasing plan, access strategy and construction
programme to be submitted are recommended, along with further detail of the
proposed access routes including upgrades to the road/access points, detail of
cable and haul road crossings of public roads, diversion of footpaths are also
required (further considered under Public Access and Recreation below). 
10.69. Transport Scotland are the roads authority for trunk roads and have raised no
objections to the proposal (to the ECU). 
10.70. Subject to conditions as recommended, the proposal is considered to comply
with the aforementioned policies in respect of transportation matters. 
10.71. Soils (Peat, Prime Agricultural Land)
NPF4 Policy 5 (Soils) states that while generally carbon rich soils should be
avoided by development, part (c) (ii) within the policy states generation of energy
from renewable sources that optimises the contribution of the area to
greenhouse gas emissions reductions targets may be accepted in peatland. 
10.72. MLDP Policy EP16 (Geodiversity and Soil Resources) states large scale (over
20MW) renewable energy proposals, development will only be permitted where
it has been demonstrated that unnecessary disturbance of soils, geological
interests, peat and any associated vegetation is avoided. Evidence of the
Page 73

Page 74

adoption of best practice in the movement, storage, management and
reinstatement of soils must be submitted along with any relevant planning
application, including, if necessary, measures to prevent the spread of invasive
non-native species. 
10.73. The proposal crosses several areas within Moray that contain peat and carbon-
rich soils. Chapter 10 of the EIA Report (and associated appendices, including a
Peat Management Plan) note the route intersects pockets of Class 1 and Class 2
peatland, as identified on the NatureScot Carbon and Peatland Map. These
areas are considered nationally important due to their role in carbon storage
and their ecological value. 
10.74. Peat surveys undertaken along the route have found that, while the majority of
the area is underlain by mineral soils, there are localised sections with
significant peat deposits in Moray. The average peat depth recorded in the
surveyed area is under 1 metre, with some isolated pockets exceeding this. The
most notable concentrations of peat are found in upland and wetland areas,
particularly to the west of the Moray section. There is virtually no peat on the
OHL route east of Elgin to Peterhead. 
10.75. To minimise impacts on peat (peat loss, compaction, erosion and
landslips/instability), the project design has incorporated mitigation by means
of micrositing, use of floating tracks and reuse/reinstatement of peat. 
10.76. With these mitigation measures in place, the EIA Report concludes that the
residual impact on peat and soils in Moray will be minor and not significant in
EIA terms. The volume of peat to be excavated is a small proportion of the total
peatland resource in Moray, and the majority of this peat will be reinstated or
used for restoration. The risk of long-term degradation or loss of carbon from
soils and peat is considered low, provided that best practice is followed
throughout the construction and operational phases. Ultimately, SEPA are best
placed to give evaluation to impacts on peat. 
10.77. SEPA have raised no objections to the proposal overall, but have highlighted
shortcomings in the outline Peat Management Plan (PMP) that was prepared in
support of the EIA Report (Volume 5, Appendix 10-2). They have requested
conditions to be placed requiring a detailed PMP to be submitted and agreed
with the planning authorities covering this proposal, subject to agreement with
SEPA. 
Page 74

Page 75

10.78. The OHL through Moray largely avoids Prime Agricultural Land (PAL) other than a
small section of grade 2 land at Burnside of Dipple, adjacent to the River Spey
on which two pylons are proposed. Whilst there is a general presumption
against development that results in the loss of PAL, NPF4 Policy 5 (b) allows for
siting of essential infrastructure (which this proposal is considered to be),
subject to there being no other appropriate site and the design minimises the
extent of PAL necessary to accommodate it. 
10.79. In this instance, it is considered the alignment of the route has been through
extensive refinement, as demonstrated in the EIA Report. The overall extent of
PAL lost as a result of this proposal is minimal, noting the impact will be limited
to the bases of two pylons/towers. In order to ensure any further loss of prime
agricultural land is minimised, in raising no objection to this proposal it is
recommended that any condition requiring compensatory flood water storage
(as requested by SEPA). Avoids the loss of PAL. Subject to this condition,  the
proposal is not considered to be at odds with NPF4 Policy 5 (b) with regards to
PAL. 
10.80. Woodland and Forestry Impacts
The forestry chapter (12) of the EIA Report considers direct and indirect
impacts, cumulative effects, and mitigation measures, focusing on a 100-metre
corridor on either side of the alignment and areas at risk of windblow due to
felling. Woodland Reports were prepared for each affected area of woodland
and the information provided in these is extensive. Reports for Moray are
covered in the EIA Report under Volume 5 appendices 12-1-53 to 12-1-93. 
10.81. NPF4 Policy 6 (Forestry, Woodland and Trees) seeks to protect and expand
forests, woodland and trees. Policy EP7 (Forestry, Woodlands and Trees) is
relevant to the issue of any felling that may take place. At a national level, the
Control of Woodland Removal Policy (CWRP) provides a policy direction for
decisions on woodland removal in Scotland, and requires the Scottish
Government to apply the policy to decisions within its areas of competence. 
10.82. In the Moray Council area, the project will result in the removal of approximately
189.58 ha of woodland. This includes 176.13 ha of commercial forestry, 12 ha of
native woodland, and 1.45 ha of ancient woodland. While the loss of
commercial forestry is considered minor and not significant in the context of
Moray’s overall forest resource, the loss of native woodland is assessed as
moderate and significant. The removal of ancient woodland is regarded as major
Page 75

Page 76

and significant due to its irreplaceable ecological value, even though it
represents only a small proportion of the total resource. 
10.83. The Kellas Alternative Arrangement would necessitate the removal of a further
11.84 ha of commercial forestry, and 2.41 ha of native woodland. The overall
loss of native woodland over and above that proposed as part of the preferred
route remains as a moderate and significant impact. 
10.84. Mitigation measures include reducing the operational corridor width where
possible, retaining scrub and understorey layers where safety allows, and
implementing off-site compensatory planting that exceeds the area of
woodland removed. These measures are designed to comply with national
policy and deliver a net positive effect on biodiversity and carbon sequestration.
Engagement with landowners will ensure that mitigation is integrated into long-
term forest plans. 
10.85. Despite these efforts, the residual effect on ancient woodland remains major
and significant, as its loss cannot be fully mitigated. For native and broadleaved
woodland, residual effects after mitigation are considered minor and not
significant. Commercial forestry and forest access impacts are also assessed
as not significant. Cumulative effects, taking into account other projects in the
area, are expected to be negligible due to compensatory planting requirements. 
10.86. The most significant impact within the Moray Council area is the loss of ancient
woodland. At the time of writing this report, Scottish Forestry had not provided
any consultation comments to the ECU. As the Scottish Government’s agency
responsible for forestry policy, support and regulations, they are best placed to
provide input on the proposal from a forestry perspective. However the Council,
as Planning Authority, also have a role in ensuring that local policies in respect
of woodland are considered. 
10.87. Given the planning policies in place (NPF4 Policy 6 and MLDP Policy EP7) are
quite clear that the loss of ancient woodland is not acceptable, the proposal is
not in accordance with these. However, recognising the position that the
development plan does not have primacy in this instance, the lack of
compliance will have to be balanced against other policy aims and schedule 9
of the Electricity Act. 
Page 76

Page 77

10.88. Conditions are to be recommended in respect of the need for compensatory
planting of an appropriate mix, taking account of input provided by the Council’s
appointed Landscape Adviser, as outlined under Landscape and Visual Impact. 
10.89. Aviation and Military Installations
When considering impacts on aviation and military/defence sites, the ECU have
consulted with relevant consultees. At the time of writing this report, NATS have
raised no objection to the proposal, whilst no responses have been received
from Aberdeen Airport and Highlands and Islands Airports at the time of writing
this report. 
10.90. Highland Gliding Club at Birnie could also be impacted – it is noted from the
Aviation Risk Assessment provided with the application that discussions are
ongoing with them in respect of impacts of the proposed OHL on their
operations. 
10.91. Under MLDP Policy EP15 there is a requirement for development proposals to
not adversely affect MOD safeguarding operations at RAF Lossiemouth and
Kinloss Barracks. At the time of writing this report, the MOD have objected to
this application due to concerns about impacts on protected airspace for RAF
Lossiemouth. 21 pylon towers are within this area, and 19 of these infringe on
the protected airspace. These pylons (CB11-1 to CB 12-6) run from
Coleburn/Netherglen to Badentinan, on the northern slopes of Brown Muir.
Whilst this is not a reason for the Council to object (noting it is within the remit
of the MOD), this response will highlight incompatibility with the
aforementioned MLDP Policy EP15 should the MOD objection not be resolved.   
10.92. Public Access and Recreation
The impacts of the OHL on recreation including outdoor access were assessed
as part of the Socio-Economic Assessment and the EIA Report (Chapter 14).
Within the Moray Council area, the OHL would cross several watercourses
including the River Lossie, River Spey, and River Isla. However, access to
recreational activities on these waterways - including kayaking, canoeing, and
fishing - will not be restricted during construction, as priority will be given to
recreational users. The OHL route also contains woodlands used for recreation,
notably Wood of Ordiequish. These woodlands are expected to experience tree
removal and the presence of construction activities, particularly where the
project bisects them. Visitors to these sites may notice reduced tranquillity and
Page 77

Page 78

visual changes, resulting in a moderate adverse (significant) effect during
construction. 
10.93. The proposal intersects with a number of public access routes including core
paths, hill tracks and public rights of way. Notably, the proposal passes over the
Dava and Speyside Ways. A Draft Outdoor Access Management Plan appended
to chapter 14 identifies the routes potentially affected by the proposal, and
outlines the approach to managing access on these routes during construction.
In reviewing the details, the Councils Outdoor Access Officer has drawn
attention to two core paths that were not considered in the draft plan, an
identified opportunities for management and enhancement of core paths as a
result of this proposal. 
10.94. The EIA Report notes that the overall impact on public access routes is
expected to be minor adverse to negligible, resulting in a minor adverse (not
significant) to neutral effect. Even for the more sensitive long-distance routes,
the effect is not anticipated to be significant when considering the full length of
the routes. Non-designated public access routes and publicly accessible land
will also experience minor or neutral effects. 
10.95. Subject to condition requiring a detailed Outdoor Access Management Plan to
be agreed with the Council to ensure management of existing recreation and
access routes during construction and enhancement of routes as a result of the
proposed OHL development, the proposal is considered to comply with relevant
policies (NPF4 Policy 13 (b)(viii) and MLDP Policy PP3 (b)(ii). 
10.96. Socio-economics
The proposal is expected to deliver substantial economic benefits, both
regionally and nationally, while facilitating the transmission of renewable energy
from the north of Scotland to areas of demand across the UK. 
10.97. The supporting Socio-Economic Assessment that accompanies the application
considers the predicted benefits of the proposal under two scenarios:
• the “Core Scenario” whereby the minimum level of supply chain content that
could be achieved locally is calculated in a worst case scenario; and
• the “Ambition Scenario” which is the potential local economic benefit of the
proposal from a full implementation of a local supply chain development
plan. This scenario would have a greater proportion of spending at a regional
(Moray, Aberdeenshire and Highland) and Scottish level. 
Page 78

Page 79

10.98. Under the Core Scenario, the proposal is forecast to generate £41.8 million in
Gross Value Added (GVA) and support 385 years of employment across the
regional area. Across Scotland, the figures rise to £413.2 million GVA and 4,010
years of employment. At the UK level, the impact is even greater, with £1,068.1
million GVA and 10,334 years of employment anticipated. 
10.99. These benefits could be further enhanced under an ambition scenario, which
assumes greater local supply chain involvement, potentially increasing the
regional impact to £91.2 million GVA and 846 years of employment, and the
Scottish impact to £495.5 million GVA and 4,931 years of employment. 
10.100. The Socio-Economic Assessment notes the applicant has adopted a
Community Wealth Building (CWB) approach to ensure that economic benefits
are retained and reinvested locally. This strategy focuses on inclusive
ownership, local procurement, workforce development, land and property, and
finance. 
10.101. The applicant has also created a housing strategy which aims to deliver at least
200 new homes and unlocking 1,000 additional homes by 2030, helping address
rural depopulation and supporting the workforce required for the project. The
“unlocking” strategy includes initiatives to refurbish disused properties and
unlock additional housing through long-term leases. This is however a generic
policy approach of the applicant, and does not specify how housing will be
developed in Moray specifically, with a general target covering the entire “north
of Scotland” which presumably covers the applicant’s transmission area.
However it is noted that the applicant has been in touch with the Council to
discuss delivery of housing in Moray. 
10.102. To ensure socio-economic benefits are maximised in Moray in accordance with
NPF4 Policies 11 (c) and 25 and the Council’s Community Wealth Building
Guidance, a condition is recommended requiring a detailed Community Wealth
Building Plan to be submitted an agreed with the Council. 
10.103. Electric and Magnetic Field Assessment
An Electric & Magnetic Field Study Report has been submitted in support of the
proposal which considers the electric and magnetic fields of the proposal. The
assessment concludes ‘(t)he assessed EMF levels comply fully with the
exposure limits set out in the UK’s Code of Practice. These guidelines are based
on internationally recognised limits and form the basis of the framework for EMF
Page 79

Page 80

safety in the UK. The results confirm that EMF levels remain within the
permissible thresholds, demonstrating the Proposed Development’s
compliance with the Code of Practice.’ 
10.104. The Council does not have the expertise to consider these matters, though
would expect this is considered and addressed by the ECU when considering
the proposed OHL. 
10.105. Cumulative Impacts/Assessment
Chapter 16 of the EIA Report evaluates the combined impacts of the proposed
development and other associated projects, focusing on both construction and
operational phases. It considers how multiple effects - including noise, traffic,
changes to visual amenity, private water supply, and flood risk - might interact
and potentially magnify impacts on local receptors, particularly residents and
transport users. 
10.106. During construction, residential receptors in Moray along the route may
experience a combination of effects. These include temporary increases in
noise and vibration, heightened construction traffic, minor changes to
hydrological conditions, and alterations to visual amenity. While some
individual effects are classified as major or moderate adverse, the cumulative
interactions are predicted to be minor adverse and not significant overall. These
impacts are expected to be localised, intermittent, and short-term, with only
slight magnification due to the overlap of effects. 
10.107. Transport users in Moray, such as those on routes which the OHL crosses
including the A940, Knockando to Dallas Road, A941, A96, and the Aberdeen to
Inverness railway may also be affected. The combined effects of construction
noise, increased traffic, and changes to the landscape are anticipated to result
in minor adverse impacts, again considered not significant. The assessment
notes that these effects are short-lived and unlikely to result in substantial long-
term consequences for transport users. 
10.108. The EIA Report concludes the cumulative effects from construction and
operation of the OHL are predicted to be minor adverse and not significant.
While magnification of effects may occur due to the interaction of multiple
impacts, these are temporary and short-term in nature. The findings suggest
that the proposed development, in combination with other foreseeable
Page 80

Page 81

projects, will not result in significant cumulative harm to residential
communities or transport users in Moray. 
11.          Conclusions and Recommendation
11.1. When balancing the considerations of relevant policies of National Planning
Framework 4 and the Moray Local Development Plan 2020, there is a clear
recognition that climate change must become a primary guiding principle for all
plans and decisions. Significant weight is to be given to the climate emergency
and the contribution of individual developments to tackling climate change.
Whilst the proposal is considered to be contrary to several policies (due to the
proposals significant landscape and visual impact and the loss of ancient
woodland), the impact of the proposal on these matters is not considered to
outweigh the need for infrastructure to transmit renewable energy. 
11.2. In light of this, it is recommended that Council raise no objection, subject to the
following: 
• The schedule of recommended conditions and informative notes as outlined
in Appendix 2.
• Note that the Council has a strong preference for the preferred alignment to
be taken forward, regardless of the determination of the Kellas Drum Wind
Farm. This is on the basis the Kellas Drum Alternative Alignment has greater
landscape and visual impacts on the Kellas area and would result in
additional environmental impacts including woodland removal.
• Request that the applicant to work with the Council to maximise the socio-
economic benefits of the proposal in the Moray area, particularly in
recognition that the Council is raising no objection to enable the timeous
delivery of nationally critical electricity infrastructure. 
• Inform Scottish Ministers that, due to this proposal being classified as a
‘Priority Application for Transmission Infrastructure’ by the Scottish
Government, the Council has had very limited time to review this large scale
infrastructure project in order to meet the consultation deadline, whilst also
having to meet deadlines to consider the proposal within the democratic
framework of the Council. Although we have worked to provide a
comprehensive and detailed assessment, we expect the Scottish
Ministers/ECU, as the decision-makers, to consider all relevant issues and
ensure these are properly addressed. 
• Note that as the enforcing authority for conditions as part of any deemed
planning permission, Moray Council would wish to be involved in the
formulation of conditions should this proposal be consented, recognising
that additional conditions may be required because of consultation
responses from other key stakeholders. 
Page 81

Page 82

Page 82

Page 83

APPENDIX 2 
MORAY COUNCIL RECOMMENDED CONDITIONS AND INFORMATIVE NOTES FOR
BEAULY TO PETERHEAD 400kV OVERHEAD LINE
The conditions suggested below are recommended by Moray Council, and it is expected
that all conditions from statutory consultees (e.g. SEPA, NatureScot etc.) are to be
placed with any grant of consent in addition to these, as well as standard conditions
placed by the ECU in respect of commencement of works, commissioning, assignation
etc. We would also request that the condition from SEPA be updated to include a
requirement to provide compensatory storage for flood water at Dipple to avoid the loss
of Prime Agricultural Land (final condition in Appendix to SEPA’s consultation response
dated 18 November 2025. Informative notes are also included.
Approved Details and Limits of Deviation
1. The development shall be constructed and operated in accordance with the
approved provisions of the application and the Environmental Impact
Assessment (EIA) Report. The development maybe amended within the Limits of
Deviation as specified in Chapter 3 (section 3.6) of the EIA Report and its
associated figures. 
No later than one month after the date of final commissioning of the
development, an updated drawing must be submitted showing the final position
of the overhead line, including the positioning and height of all supporting towers
and associated infrastructure forming part of the development must be
submitted for the written approval of the Planning Authority. The updated
drawing requires to specify areas where micro-siting has taken place and, for
each instance, be accompanied by copies of the ECoW approval or other
technical justification. 
Reason: To control environmental impacts while considering local conditions. 
Mitigation Measures
2. No development (including the Site Enabling Works) shall commence until a
Schedule of Mitigation has been submitted to and approved in writing by the
Planning Authority. This Schedule shall encompass a list of all mitigation
measures from the EIA Report, any other commitments made by the applicant
and all relevant mitigation secured by conditions attached to this permission
with defined timescales for implementation of each mitigation measure. 
Thereafter, the approved Schedule of Mitigation shall be implemented in full
unless otherwise approved in writing by the Planning Authority. 
Reason: To ensure that the identified mitigation through the EIA Report is carried
out in accordance with the approved details. 
Planning Monitoring Officer
3. There shall be no Commencement of Development until the terms of
appointment by the Company of an independent and suitably qualified
Page 83

Page 84

consultant as Planning Monitoring Officer (“PMO”) have been submitted to, and
approved in writing by, the Planning Authority.  The terms of appointment shall: 
(a) impose a duty to monitor compliance with the terms of the deemed planning
permission and the conditions attached to it; 
(b) require the PMO to submit a quarterly report to the Planning Authority
summarising works undertaken on site, matters of compliance or otherwise
with the terms of the deemed planning permission and conditions attached
to it, alongside a summary of the incidents recorded and reported by the
Environmental Clerk of Works and Ecological Clerk of Works; and
(c) require the PMO to report to the Planning Authority any incidences of non-
compliance with the terms of the deemed planning permission and
conditions attached to it at the earliest practical opportunity, and no later
than 10 working days following the incidence of non-compliance.
The PMO shall be appointed on the approved terms throughout the period from
Commencement of Development to completion of construction works and post-
construction site reinstatement works. 
Reason: To ensure compliance with the planning permission and the conditions
attached to it. 
Ecological Clerk of Works
4. (1) There shall be no Commencement of Development until the terms of
appointment of a suitably qualified, experienced, and independent Ecological
Clerk of Works (“ECoW”) by the Company have been submitted to, and approved
in writing by, the Planning Authority. The terms of appointment shall: 
(a) impose a duty to monitor compliance with the ecological and
hydrological commitments provided in the approved Schedule of
Mitigation, any micro-siting within the Limits of Deviation as approved
under condition 1, the Construction and Environmental Management
Plan approved under condition 6, the Habitat Management Plan approved
under condition 9, and consider and approve any micro-siting requests in
accordance with the provisions of condition 1 (“the ECoW works”); 
(b) require the ECoW to report to the nominated construction project
manager any incidences of non-compliance with the ECoW works at the
earliest practical opportunity; 
(c) require the ECoW to submit a quarterly report to the Planning Authority
summarising works undertaken on site; and
(d) require the ECoW to report to the Planning Authority any incidences of
non-compliance with the ECoW works at the earliest practical
opportunity, and no later than 5 working days following the incidence of
non-compliance. 
(2) The ECoW shall be appointed on the terms approved under part (1)
throughout the period from pre-construction works, commencement of
Page 84

Page 85

development, to completion of construction works and post-construction site
reinstatement works. 
Reason: To secure effective monitoring of and compliance with the
environmental mitigation and management measures associated with the
Development during the construction, post-construction restoration,
decommissioning, restoration and aftercare phases.  
Environmental Clerk of Works
5. (1) There shall be no Commencement of Development until the terms of
appointment of an independent Environmental Clerk of Works (“EnvCoW”) by
the Company have been submitted to, and approved in writing by, the Planning
Authority. The terms of appointment shall: 
(a) impose a duty to monitor compliance with the environmental
commitments provided in the EIA Report, any micrositing under condition
1, the Construction and Environmental Management Plan approved under
condition 6, the Habitat Management Plan approved under condition 9,
and all species or habitat management plans identified in the EIA Report;
(b) require the EnvCoW to report to the nominated construction project
manager, developer and Planning Authority any incidences of non-
compliance with the EnvCoW works at the earliest practical opportunity; 
(c) require the EnvCoW to submit a monthly report to the construction
project manager, developer and Planning Authority summarising works
undertaken on site. 
(2) Prior to the decommissioning, restoration and aftercare phases of the
Development or the expiration of the operational period of the consent
(whichever is the earlier), details of the terms of appointment of a suitably
qualified, experienced, and independent EnvCoW by the Company throughout
the decommissioning, restoration and aftercare phases of the Development
shall be submitted to, and approved in writing by the Planning Authority. 
(3) The EnvCoW shall be appointed on the terms approved under part (2)
throughout the decommissioning, restoration and aftercare phases of the
Development. 
Reason: To secure effective and transparent monitoring of and compliance with
the environmental mitigation and management measures associated with the
Development during the construction, decommissioning, restoration and
aftercare phases 
Construction Environment Management Plan
6. No development shall commence until a Construction Environmental
Management Plan (CEMP) has been submitted and agreed in writing by the
Planning Authority in consultation with the Service Manager, Environmental
Health. The plan shall include measures to minimise construction related noise
Page 85

Page 86

(including vibration), dust and artificial lighting. Thereafter the development will
be carried out in accordance with the agreed plan. 
Reason: In order that environmental emissions are considered and managed at
the construction phase, in order to protect local residents.
Compensatory Planting
7. No development shall commence unless and until a woodland compensatory
planting plan (CPP) in accordance with the Scottish Government Control of
Woodland Removal Policy 2025 (or such replacement as may be in place at the
time that the CPP is submitted for approval) and the Moray Woodland and
Forestry Strategy 2025 has been submitted to and approved in writing by the
Planning Authority in consultation with Forestry Scotland (FS). The CPP shall
provide details of the planting of woodland and include:- 
(a) The location and details of the proposed planting, timescales for
implementation and its maintenance for the operational period of the
Development; 
(b) Planting at a greater level than that to be felled as part of the proposal in the
Moray Council area; and 
(c) A silvicultural proposal for compensatory planting and a protection plan for
the life of the development. 
Reason: To enable appropriate woodland removal to take place in accordance
with the current Scottish Government Control of Woodland Removal Policy. 
Forestry Felling Plan
8. No felling shall take place until a Forestry Felling Plan (FFP) has been submitted
to and approved in writing by the Planning Authority in consultation with Scottish
Forestry. The FFP shall cover the Development site and shall provide: 
(a) details of felling and restocking proposals;
(b) details of the management measures to reduce the amount of felling
required to accommodate the Development;
(c) measures to deal with forest waste including brash in line with the UK
Forestry Standard;
(d) timelines for implementing the plan;
(e) details setting out annual monitoring of the felled area and reporting
procedures to be carried out by a qualified expert;
(f) details of forestry management practices; and
(g) details demonstrating compliance with The UK Forestry Standard and the
Scottish Government’s Policy on Control of Woodland Removal (as amended
or replaced from time to time) and the Moray Woodland and Forestry Strategy
2025.   
The approved FFP shall be implemented in full upon Commencement of Felling. 
Reason: To minimise and manage the effects of forestry felling required to
accommodate the Development.
Page 86

Page 87

Habitat Management Plan
9. There shall be no Commencement of Development until a Habitat Management
Plan (HMP) taking account of the Outline Habitat Management Plan (Vol 5,
Appendix 8-3, Annex F of the EIA Report), has been submitted to, and approved
in writing by the Planning Authority. 
The HMP shall set out proposed habitat management of the site during the
period of construction, operation, and decommissioning, restoration and
aftercare, and shall provide for the maintenance, monitoring and reporting of
those habitats identified in the Outline Habitat Management Plan, as well as any
protected species that may be identified on site. 
The HMP shall provide provision and details for regular monitoring and review to
be undertaken against the HMP objectives and reasonable measures for
securing amendments or additions to the HMP in the event that the HMP
objectives are not being met. 
Until otherwise approved in advance in writing by the Planning Authority, the
approved HMP (as amended from time to time with written approval of the
Planning Authority) shall be implemented in full in line with the timescales set
out in the approved plan. 
Reason: In the interests of good land management and the protection of
habitats. 
Biodiversity Enhancement
10. No development shall commence until an updated Biodiversity Enhancement
Plan (BEP) has been submitted to and approved in writing by the Planning
Authority in consultation with NatureScot, SEPA and RSPB. This shall be
prepared in accordance with and follow on from the approved details within the
approved EIA Report, which has been formulated as a result of the finalised
route (including micrositing). Unless otherwise approved in advance in writing
with the Planning Authority, the approved BEP shall be implemented in full. 
Reason: In the interests of the protection of the habitats of those species
identified in the EIA Report and provision of biodiversity enhancement. 
Landscape Mitigation
11. As per the approved EIA Report Appendix 7.6, the mitigation measures as
proposed should be undertaken in respect of landscape mitigation planting, in
line with timescales for planting to be agreed in writing with the Council, as
Planning Authority along with the provision of the following additional mitigation: 
• the increase of the Operational Corridor to 120m in the western part of
Ordiequish Wood and other sections of the OHL route; 
Page 87

Page 88

• the whole Operational Corridor within Ordiequish Wood should be
subject to similar treatment as the western part (shown in Plate 2 of
Appendix 7.6) due to the recreational use of this woodland; and
• additional landscape mitigation planting to be undertaken at the most
severely affected Residential Receptor Groups identified in the approved
EIA Report, per those specified in Chapter 7 and its figures and
appendices. 
Reason: To ensure appropriate landscape mitigation planting is undertaken, in
the interests of the character and amenity of the area surrounding the
development. 
Outdoor Access Management Plan
12. No development shall commence until an Outdoor Access Management Plan
(OAMP) which is based on the Draft OAMP contained in the approved EIA Report
(Volume 5, Appendix 14) has been submitted to and approved in writing by the
Planning Authority in consultation with the Outdoor Access and Countryside
Officer. The Access Plan will include the consideration of the upgrade of the
existing tracks, the formation of new tracks and other improvements to provide
enhanced access opportunities and improvements to track surfaces across the
proposed development area, in consultation with local communities. 
Reason: To improve public access in and around the development area. 
Community Wealth Building Plan
13. Prior to development commencing, a Community Wealth Building Plan shall be
submitted to and approved in writing by the Council, as Planning Authority. The
plan shall be prepared in accordance with the Moray Council’s adopted
“Community Wealth Building Planning Guidance” and shall also be
accompanied by a monitoring statement, which shall demonstrate how the
development will deliver beneficial effects to the local economy from the
construction and operation of the approved wind farm. Thereafter the
development shall be implemented in accordance with the approved details,
unless otherwise agreed in writing with the Council as Planning Authority. 
Reason: To ensure compliance with National Planning Framework 4 policies 11
and 25 with regard to community wealth building. 
Working Hours
14. Unless otherwise agreed in writing with the Council, as Planning Authority, all
working hours shall be in accordance with those specified in the approved EIA
Report Chapter 3 Section 3.11. 
Reason: In the interests of the amenity of residents in the area surrounding the
development. 
Private Water Supplies
Page 88

Page 89

15. No development shall commence until a Private Water Supply Management Plan
and Private Water Supply Monitoring Plan regarding the impact of the
development on private water supplies is prepared by a suitably qualified
professional has been submitted to and agreed in writing by the Council as
Planning Authority. The plan must include the mitigation and resolutions for
affected sources identified in document titled Water and Geological
Environment, dated September 2025, during all three stages of development
(construction, operation and decommissioning). The Private Water Supply
Management Plan and Private Water Supply Monitoring Plan should include
mitigations and a water quality testing regime. 
The plans shall include the testing regime in compliance with the Water Intended
for Human Consumption (Private Supplies)(Scotland) Regulations 2017
parameters and mitigations including the provision of emergency potable water
to affected supply users in the event of contamination and provision of a new
water supply in the event that the contamination is long term and the supply is
no longer fit for human consumption. The water testing should also include
monitoring levels for site specific building materials, hydrocarbons and or other
site specific leaching or spill risk materials or chemicals which may affect the
wholesomeness of potable water. 
Although the overall assessment of the impact on low, medium and high risk
private water supplies has been calculated at 10.5.114, to be Negligible Adverse
(not significant), the human impact of losing a private water supply in a remote
isolated location and the inability to flush toilets, wash and have access to basic
domestic facilities is an immediate deterioration in tolerable living standards. As
such there must be effective mitigations in place to communicate with users of
affected private water supplies and provide potable and other usable water for
sanitary and domestic use  within a reasonable time period from the issues
being identified. 
In the event that the wholesomeness or adequacy of any private water supply
becomes affected by construction activity, all users of such supplies and the
Environmental Health Manager of Moray Council must be contacted by the
applicant/developer to agree longer term remediation measures within 14
calendar days from the date the wholesomeness or adequacy of the supply has
been affected. Thereafter repair of any affected private water supply must be
carried be to the satisfaction of the Council as Planning Authority in consultation
with the Environment Health Manager. The Council shall be the final arbiter
whether any supply has been affected by this development. 
Reason: In order to safeguard and maintain the wholesome provision of any
private water supply affected by the development and monitor the cumulative
effect of the development, if any, on the water security of the area. 
Archaeology
Page 89

Page 90

16. No works in connection with the development hereby approved shall commence
unless an archaeological written scheme of investigation (WSI) has been
submitted to and approved in writing by the planning authority and a programme
of archaeological works has been carried out in accordance with the approved
WSI. The WSI shall include details of how the recording and recovery of
archaeological resources found within the application site shall be undertaken,
and how any updates, if required, to the written scheme of investigation will be
provided throughout the implementation of the programme of archaeological
works. Should the archaeological works reveal the need for post excavation
analysis the development hereby approved shall not be occupied or brought into
use unless a post-excavation research design (PERD) for the analysis,
publication and dissemination of results and archive deposition has been
submitted to and approved in writing by the planning authority. The PERD shall
be carried out in complete accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. Any
proposed compensatory planting should take account of the historic
environment and should follow industry best practice in terms of avoiding
damage to heritage assets. 
Transportation 
17. Notwithstanding the submitted details, prior to the commencement of any
development, a detailed Phasing Plan, Access Strategy, and detailed
Construction Programme for the development shall be submitted to and
approved the Council, as Planning Authority in consultation with the Roads
Authority. The Phasing Plan, Access Strategy, and detailed Construction
Programme shall include the details of all proposed routes for construction
traffic and abnormal load deliveries and the locations of all proposed access
points on the public road network, along with the timing of works at each
location on the cable route. 
Thereafter, all works shall be completed in accordance with the approved
Phasing Plan, Access Strategy and Construction Programme. 
Reason: In order to ensure that the matters specified can be fully considered
prior to the commencement of development. 
18. The planning permission hereby granted for the proposed development shall be
carried out only in accordance with the approved phasing plan permitted by
Condition 16 and the details including detailed drawings (and other supporting
information), which shall previously have been submitted to and approved by the
Council, as Planning Authority in consultation with the Roads Authority in line
with the matters specified for that phase of the development. These drawings
and details shall show the matters specified in Condition 19 and 20 below. 
Page 90

Page 91

Reason: In order that detailed consideration can be given to the matters
specified prior to the works commencing on each phase of the development. 
19. In pursuance of Condition 17 above, for each phase of the development for
which details are to be submitted for approval the required details shall be: 
(a) Detailed drawings of the proposed access routes for the phase and details of
the number and size of construction vehicles using the access routes for that
phase of development, including all traffic associated with the extraction of
timber to enable the proposed development.
(b) Detailed drawings of the improvements required to the public roads utilised
by construction traffic and any abnormal load deliveries for the phase, which
shall include but not be limited to the provision of new passing places,
junction improvements, road widening and edge strengthening, all on ground
over which the applicant has or can obtain control at location(s) and
constructed in accordance with Moray Council specification.
(c) Detailed drawings of the proposed access locations onto the public road for
construction vehicles for the phase, including the required visibility splays
(including evidence of control of land), access specification and construction
details, details of all earthworks and drainage provision and/or drainage
diversion, details of proposed fencing/gates, signage and any required
temporary traffic management, along with details of reinstatement works for
any temporary access.
(d) Details of the locations of all overhead cable and haul road crossings within
that phase of the development and the proposed works associated with the
crossings, including but not limited to, the means of cable crossing, means
of access to works areas, details of the haul road crossings and any required
temporary traffic management, and details of required reinstatement works.
(e) Details of diversion routes for local footpaths during the construction period
and associated signage (to be agreed with the Access Manager).
(f) A Construction Traffic Management Plan (CMTP), the details of which must
include, full details of construction traffic routes from/to the site, parking
provision for staff and the loading/unloading, provision for the prevention of
material being deposited onto the public road including wheel cleaning and
for road sweeping at construction access(es) to the public road, full details of
temporary arrangements to safeguard pedestrian/cyclist movements during
the construction period, a programme for monitoring and provisions for
interim maintenance to be undertaken to ensure safe and suitable access is
maintained for the construction access routes for the duration of the works
will be required.
(g) A ‘Before’ road condition video and joint Contractor/Council road surveys. 
Thereafter, all works shall be completed in accordance with the approved details
and with the Construction Traffic Management Plan. 
Reason: In order to ensure that the matters specified can be fully considered
prior to the commencement and to ensure acceptable infrastructure to enable
Page 91

Page 92

access to the development and development that does not create any hazard to
road users in the interests of road safety. 
20. In pursuance of Condition 18 above for each phase of the development where
there is a requirement for Abnormal Load deliveries for which details are to be
submitted for approval the required details shall be: 
(a) A detailed survey of the Abnormal Load delivery route shall be carried out to
determine the locations of structures (e.g. bridges) and street furniture
affected by any construction and/or abnormal indivisible load vehicle
movements. 
(b) Road improvements/strengthening (either temporary or permanent) required
as a result of the survey prior to any movements of any construction and
abnormal load traffic shall be completed.
(c) Abnormal Load Traffic Management Plan, details of which must include the
methods of dealing with large and/or abnormal delivery vehicles, vehicle
swept path analysis and the methods of marshalling and manoeuvring at
junctions on the public road network.
(d) Evidence of the completion of an Abnormal load trial run(s) undertaken for
the delivery route. Representatives from the Moray Council Transportation
(Traffic), the Trunk Road Authority, Police Scotland, and any other roads
authorities where roads will form part of the route of the delivery must be
invited to the trial run. 
Thereafter, all works associated with the Abnormal Load Deliveries shall be
completed in accordance with the approved details and the Abnormal Loads
delivered in accordance with the Traffic Management Plan. 
Reason: In order to ensure that the matters specified can be fully considered
prior to the commencement and to ensure acceptable infrastructure to enable
access to the development and development that does not create any hazard to
road users in the interests of road safety. 
21. Prior to commencement development on any phase of the development, the
following shall be submitted to and approved by the Council, as Planning
Authority in consultation with the Roads Authority: 
(a) Evidence to confirm that a Section 96 ‘Wear and Tear’ Agreement has been
completed and agreed by the developer or their representative and the local
Roads Authority, including a commitment to the undertaking of joint ‘before’
and ‘after’ road condition surveys, to ensure that the costs or works to repair
damage to the public road as a result of construction traffic on the roads
identified in Condition 17 will be met.
(b) Evidence to confirm that a Road Bond to accompany each Section 96 ‘Wear
and Tear’ Agreement has been provided and will be held for the duration of
the construction period.
Page 92

Page 93

Reason: To ensure that any adverse impact on the condition of the public road,
including roadside verges, attributable to the development traffic is identified
and ameliorated. 
22. At the start and end of each phase (as per Condition 17) ‘before’ and ‘after’
condition video surveys of the proposed delivery and construction traffic routes
shall be undertaken jointly with the Roads Authority and a copy of the survey
provided to the Planning and Roads Authority. 
Reason: To ensure that any adverse impact on the condition of the public road,
including roadside verges, attributable to the development traffic is identified
and ameliorated. 
Informative Notes
Aberdeenshire Council Archaeology Service (on behalf of Moray Council) 
Delivery of Public Benefit 
Archaeological mitigation provides an opportunity for the delivery of public benefit.
Community engagement can enhance public understanding of, and support for, the
historic environment, adding value to both the conditioned archaeological work being
undertaken as well as to the development itself. Identifying appropriate community
stakeholders (e.g. local schools, heritage groups, community hubs, employability
schemes), and undertaking consultation and engagement with them to inform the
approach to engagement, should be undertaken early and in advance of the
commencement of the programme of archaeological works to ensure that appropriate
engagement activities and deliverables can be incorporated effectively. 
Potential public benefit opportunities should be outlined in the Written Scheme of
Investigation (WSI) and be based on ALGAO Scotland’s Delivery of Public Benefit and
Social Value Guidance for Archaeology in the Planning Process (2023). The WSI should
include how these benefits might be achieved by means of engagement, participation
and/or dissemination of the results both during and after the project, as appropriate to
the scale, nature, and circumstances of the work. This may vary from a brief social
media post for a smaller project to a full-scale community project for larger scale, more
complex sites. Delivery of these public benefits, with further expansion or reduction of
engagement activities to be undertaken depending on the results of the mitigation, will
be further explored at both the Data Structure Report (DSR) stage (within its
‘Recommendations’), and, if required, at the Post-Excavation Research Design (PERD)
stage of the archaeological mitigation process. 
Moray Council – Transportation Manager
Prior to the commencement of deliveries or construction activity, a Section 96
Agreement under the Roads (Scotland) Act 1984 will be required to be approved
between the developer and the Roads Authority. This is to ensure that the costs to repair
Page 93

Page 94

any damage to the public roads as a result of the construction work traffic are met by
the applicant. A Road Bond will be required to accompany the Section 96 Agreement. 
Planning consent does not carry with it the right to construct a new road or any part of a
road. In accordance with Section 21 of the Roads (Scotland) Act 1984 Construction
Consent for new roads (includes passing places, modified junctions and footpaths) that
will form part of the public road will be required. Advice on this matter can be obtained
by emailing transport.develop@moray.gov.uk and reference to the following pages on
the Council website. 
Checklist: http://www.moray.gov.uk/downloads/file68812.pdf
RCC and Specification: http://www.moray.gov.uk/moray_standard/page_65638.html
Before commencing development, the applicant is obliged to apply for permission to
modify the existing public road, in accordance with Section 56 of the Roads (Scotland)
Act. The applicant will be required to provide technical information, including drawings
and drainage calculations, a programme for the proposed works. Advice on the
application process can be obtained by emailing transport.develop@moray.gov.uk 
The applicant is obliged to apply for road opening permit(s) in accordance with Section
85 of the Roads (Scotland) Act 1984. Advice on this matter can be obtained by
emailing roads.permits@moray.gov.uk and reference to the following page on the
Council website 
Road Opening: http://www.moray.gov.uk/moray_standard/page_79860.html 
Public utility apparatus may be affected by this proposal. Contact the appropriate utility
service in respect of any necessary utility service alterations, which have to be carried
out at the expense of the developer. 
Based on the Swept Path Analysis, all public road widening to accommodate vehicle
overrun areas up to 6m, curve widening areas (more than 6m), widening to provide
better two-lane approaches and required improvements to junction turning facilities
should be permanent full road construction and only additional widening to be
considered as temporary. 
The submitted AiLs assessments have been prepared using Ordnance Survey (OS)
mapping, which is generally not sufficiently accurate in rural areas. Therefore, the SPA
drawings must be updated using detailed topographical survey data when discharging
the relevant planning conditions to ensure accuracy and reliability. 
All marginally widening of carriageway should not be less than 1m wide to allow for
proper compaction and construction with the formation of a stepped linear joint into
carriageway. 
Page 94

Page 95

As a winter maintenance provider, Moray Council cannot offer special winter
maintenance services for public roads that form part of construction traffic routes on
behalf of the developer. 
It can only be assumed that Moray Council have 1 metre of road verge in the rural area.
Confirmation of third-party agreement in writing is required for any area of over run,
vegetation trimming or fence relocation out with the public road. 
Local load bearing widening’s which would encourage overrun by others must be made
permanent with full road construction and utilised as formal passing places where
appropriate. There should be a minimum of 1 metre verge behind any new construction.
Road Construction Consent will be required. 
It is important to clarify how temporary road widenings will be managed both between
Abnormal Indivisible Load (AiL) deliveries and throughout the lifetime of the
development. This is particularly significant, as other vehicles may begin to use these
temporary widening areas, which could lead to rapid deterioration of the surfaces and
result in loose material accumulating on the carriageway, posing safety risks. 
Vegetation should be cleared from the road verge and overhanging bushes to a point
one metre back on the road verge and around passing place signs for the duration of the
construction period. This is to ensure maximum forward visibility of oncoming vehicles
and passing places is maintained in the interest of road safety. 
At any locations where kerbing is provided as an edge of the existing carriageway, this
must be replicated at the edge of any permanent widening. 
Any permanent widening must consider the impact on road drainage especially
additional run off areas. All alterations either permanent or temporary must not be to
the detriment of any existing road drainage, which must be retained, relocated or
reinstated to the satisfaction of Roads Maintenance on completion of all abnormal
traffic movements. 
Where substantial earthworks are required to accommodate over sail areas, these
areas should be considered as permanent earthworks and a minimum verge upstand of
300mm would be required to discourage vehicle overrun.  If the carriageway is widened
to 6m or wider than 6m in these areas, a 100mm upstand would be sufficient. 
Signs which are in place for road safety reasons must be socketed, removed as AiL’s
approach and reinstated immediately after the vehicles pass. 
It is not acceptable to overrun central refuge / splitter islands, they are not constructed
to take vehicle loadings. Proposals submitted must show how this will be managed
during deliveries. It is also not appropriate to remove signing for the duration of the
abnormal loads therefore confirmation of how signs will be managed during the delivery
phase needs to be agreed. 
Page 95

Page 96

Some of the side tracks which join the public road may appear to be part of the public
road as they have a thin layer of tar on them. It is unlikely that there is suitable road
construction under any of them and where they are being utilised each location should
be assessed and reconstructed if necessary. 
Prior to completion of the development, all areas of temporary over-run must be
reinstated to an appropriate standard. Example 300mm thick dressed topsoil and
reseeded appropriate for the surroundings. 
Additional details for all areas of road widening and new passing places must also
include drainage details to accommodate the additional road surface area. 
Any street furniture, which will need to be repositioned to enable the development,
including deliveries to the development, shall be at the expense of the developer.
Furthermore, any existing roadside ditch, which requires relocating, a pipe or culvert
shall be agreed in advance of any works commencing at that location. Advice on these
matters can be obtained by emailing road.maint@moray.gov.uk 
The developer shall be responsible for any necessary diversion of any utilities or
drainage present at the locations where works are to be undertaken. 
The developer shall meet all costs of improvements to the road infrastructure, which
are required as a result of the development, including any measures to enable the use
of structures on the public road for construction traffic and abnormal load deliveries. 
The developer shall meet all costs of removal and re-erection of road signage, which are
required as a result of the delivery of the abnormal loads. 
The developer shall meet all costs of diverting any footpath or cycleway during the
construction period, including signage. 
The developer shall be responsible for ensuring that surface/ground water does not run
from the public road into the site. 
The developer shall free and relieve the Roads Authority from any claims arising out of
his operations on the road or extension to the road. 
No retaining structures or embankments shall be constructed along the edge of the
road, whether retaining the public road or ground adjoining the public road without prior
consultation and agreement of the Roads Authority. Advice on the retaining
structures/embankments can be obtained by emailing structures@moray.gov.uk 
The Transportation Manager must always be contacted before any works commence.
This includes any temporary access, which should be agreed with the Roads Authority
prior to work commencing on it. 
Page 96

Page 97

Transport Scotland must be consulted regarding all deliveries proposed via the Trunk
Road and any proposed access points onto the Trunk Road network. In addition,
neighbouring Local Authorities through which the delivery routes may pass should also
be consulted as appropriate. 
Moray Council – Flood Risk Management
Towers located within flood plains are susceptible to the accumulation of debris during
flood events. It is strongly recommended that any debris be cleared as soon as it is safe
to do so following such events. Failure to remove debris promptly may result in
increased flood risk due to obstruction of natural water flow across the flood plain. 
Additionally, large floating debris poses a significant risk of structural damage to towers
during flooding. Appropriate maintenance and monitoring procedures should be
implemented to mitigate these risks and ensure the resilience of infrastructure within
flood-prone areas. 
Moray Council – Outdoor Access and Countryside Officer
When submitting the detailed Outdoor Access Plan, paths at Meikle Balloch and
Newmill should be also included (noted these are excluded from the outline plan). 
Page 97

Page 98

Page 98

Page 99

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance. PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
Beauly To Peterhead
Planning Application Ref Number:
25/01364/S37
Applicant Name:
Scottish Hydro Electric Transmission PLC
APPENDIX 3
Page 99

Page 100

OHL
Route
- M
oray
16/01664/APP
Page 100

Page 101

Page 101

Page 102

Page 102

Page 103

Report to: Planning and
Regulatory Services
Committee 
Meeting
Date:
16 December 2025  
Report by: Executive Director
Economy, Enterprise
and Operations        
Author: Suzanne Wilson Contact
Email:
performance@moray.gov.uk 
Subject: Performance Report (Economic Growth and Development -
Planning) – Period to September 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise performance in areas of Service
Planning, Service Performance and other related data to the end of September
2025 and note actions being taken to improve performance where required.  
1.2  This report is submitted to Committee in terms of Section III (A) (4) of the
Council’s Scheme of Administration to monitor performance in accordance with
the Council’s Performance Management Framework.  
2.  SUMMARY  
2.1  At the end of September 2025, the Economic Growth & Development
(Planning) 2025-28 Service Plan actions that are reported to this committee
were 39% complete.  Progress against Service Plan Priorities and Indicators
and operational Service Performance Indicators is presented in the table and
charts below. 
Item 6.
Page 103

Page 104

3.  RECOMMENDATIONS  
3.1  It is recommended that Committee scrutinises and notes performance in
areas of Service Planning, Service Performance and other related data to
the end of September 2025 and note actions being taken to improve
performance where required.   
Suzanne Wilson
Research & Information Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
priorities.   
4.2  Service Plan actions are weighted to reflect priority ratings.  Actions with higher
priorities receive greater weightings which contribute more to the overall
delivery of the Plan.  Progress on Service Plan priorities and outcomes and key
areas of operational performance is reported by exception, highlighting
successes and giving assurances around the challenges and actions to
support. Links to Service Plan Actions, priority ratings and weightings and
Performance Indicators can be accessed within the background papers
section of this report.  
4.3  Complaints are reported in terms of time taken to respond, outcomes and
learning points.  Links to Complaints tables can be accessed within the
background papers section of this report. 
4.4  Latest Local Government Benchmarking Framework (LGBF) results for 2024/25
are published throughout the year with final refresh of data around June 2026. 
The full suite can be viewed via the LGBF Dashboard.  Published indicators for
Page 104

Page 105

this service have been incorporated with the relevant section of this report
depending on whether used to evidence progress against strategic, service
level or service performance priorities.  LGBF indicator targets and RAG status
in the backing tables is now based on ranking thresholds aligning with
exception reporting. 
4.5  The Sustainable Development Statement was approved by the Corporate
Committee on 5 November 2024 (para 16 of the Minute refers).  The Statement
draws out the way in which sustainable development is embedded in the
Corporate Plan 2024-29 and wider corporate policies, strategies, and plans
with progress being reported through several updates and reports, one of
which is quarter 4 performance reporting.  Service Plan actions and indicators
that underpin the delivery of Sustainable Development Goals are highlighted in
the backing table documents and comment where relevant is incorporated in
this report.  An overview of progress will be presented in the annual Corporate
Plan progress update. 
5.  PROPOSALS  
Successes – Service Plan Strategic & Service Level Outcomes and
operational Service Performance
5.1  Work to review Developer Obligations Supplementary Guidance is almost
complete.  Following a peer review with Aberdeenshire Council, a final version
of the Guidance is due to be included as an agenda item to this meeting of
Committee.  (Service Level Action EGD25-28 Serv 5.2.4) 
5.2  Latest available data shows continued improvement for building warrants and
amendments with 98.84% issued within 20 working days.  Those issued within
10 days of receipt of satisfactory information remained at 100%.  (Service
Performance Indicators ENVDV-BS-KP01(B) and ENVDV-BS-KPO1(C)) 
5.3  Good performance is also evident with the increased number of plans
responded to rising to 288.  At the same time, the average response time
decreased to 4.01 days, reflecting improved efficiency. (Service Performance
Indicators ENVDV046a and ENVDV046b)  
Challenges and actions to support – Service Plan Strategic & Service Level
Outcomes and operational Service Performance
5.4  Development of an Environmental Health Team Plan is reported at 20%
complete against a due date of December 2025.  Key performance indicators
have been reviewed and relevant plans collated, with work to continue during
quarter 3.  (Service Level Action EGD25-28 Serv 5.2.5) 
Complaints and MP/MSP Enquiries
5.5  In line with the Performance Management Framework, complaints are 
reviewed quarterly by departmental management in terms of time taken to 
respond, outcome and learning points. Overall complaint analysis for 
Page 105

Page 106

Economic Growth and Development is incorporated in half yearly 
performance reports to the Economic Development and Infrastructure 
Committee. Detailed complaint tables can be accessed within the 
Background Papers section of those reports. 
Other Performance (not included in the Service Plan)
5.6  The Building Standards team were presented with a National Performance
Award from the Scottish Government for the first time.  Presented at the
Building Standards Leaders Forum in Glasgow on the 26 November 2025, this
award recognises the Team’s strong performance across all seven national Key
Performance Outcomes during the reporting period 2024-25. 
Case Studies
5.7  Nothing to report. 
Consultation and Engagement
5.8  Nothing to report. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
Page 106

Page 107

☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as
outlined in the following local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in  
Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council has a statutory requirement to publish a range of information that
will demonstrate that it is securing best value and assist in comparing
performance both over time and between authorities where appropriate.  
6.4  Financial 
None arising from this report. 
6.5  Risk 
None arising from this report.  
6.6  Staffing 
None arising from this report.  
6.7  Best Value and Transformation 
How councils plan for, manage and report on performance is a key area of
focus in external audit work, particularly on best value.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Growth,
Planning and Climate (Chief Planning Officer) and relevant Service
Managers and any comments made have been incorporated. 
Page 107

Page 108

8.  BACKGROUND PAPERS  
8.1  Service Plan Actions 
Service Performance Indicators 
Page 108

Page 109

Report to: Planning and Regulatory
Services Committee
Meeting Date: 16 December 2025
Report by: Executive Director Economy, Enterprise and Operations
Author: Arooba Muzma Contact Email: Arooba.muzma@gov.moray.uk
Subject: Moray Employment Land Audit 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1 The purpose of this report is to note the employment land supply in Moray and ask the
Committee to agree the final version of the Moray Employment Land Audit 2025.
1.2 This report is submitted to Committee in terms of Section III (E) (2) of the Council's
Scheme of Administration relating to the review and preparation of Local Development
Plans.
2. SUMMARY
2.1 The report provides an overview of the current employment land supply level in Moray and
highlights a lack of choice of sites and a shortage of land within Speyside. The
Employment Land Audit 2025 is a key tool informing the new Moray Local Development
Plan 2027 providing up to date evidence on the availability, quality and take up of
employment land.
3. RECOMMENDATIONS
3.1  It is recommended that Committee:
i) note the employment land supply in Moray.
ii) approve the finalised Moray Employment Land Audit 2025, as set out in
Appendix 1 of the report.
Author Name: Arooba Muzma
Job Title: Planning Officer
4. BACKGROUND AND CONTEXT
4.1  National Planning Framework 4 (NPF4) requires Local Development Plans (LDPs) to
allocate sufficient land for business and industry to ensure that there is a suitable range of
Item 7.
Page 109

Page 110

sites that meet current market demand, location, size, and quality in terms of accessibility
and services and that it is reviewed regularly to ensure that there is a sufficient supply to
meet national and regional targets.  
4.2  The spatial principles within NPF4 seek to support delivery of productive places that have
a greener, fairer, and more inclusive wellbeing economy. The intent of Policy 26 Business
and Industry is to encourage, promote and facilitate business and industry uses and
enable alternative ways of working. NPF4 states LDPs should allocate sufficient land for
business and industry, taking into account business and industry land audits, in particular
ensuring that there is a suitable range of sites that meet current market demand, location,
size and quality in terms of accessibility and services. The Evidence Report for the Moray
Local Development Plan 2027 (MLDP2027) identified the land requirements within each
market area as well as highlighting the issues around delivery of serviced land and
pressure on land for other uses. The Employment Land Audit (ELA) is a key tool in
informing the proposed MLDP2027 by providing up-to-date evidence on the availability,
quality and take-up of employment land, ensuring that allocations respond to market
demand, address delivery challenges, and support a balanced distribution of sites across
Moray.  
4.3  The Moray Employment Land Audit has three key functions:- 
• demonstrate the availability of a range and choice of marketable employment sites;
• provide an overview of the supply and availability of employment land across the
Local Development Plan area; and 
• provide an evidence base for the monitoring and review of policies and proposals
within the LDP. 
The Employment Land Audit (ELA) is provided in Appendix 1.  
4.4  The audit includes four categories of land supply:- 
Established – This includes all undeveloped land allocated for
industrial/business/employment use in the adopted LDP or land that has a valid
planning approval for these uses.
Marketable/Effective – Land that as well as meeting business requirements, has a
secure planning status, can be serviced within 5 years and is accessible by walking,
cycling and public transport.
Constrained – Land that is not considered developable within 5 years due to issues
such as planning difficulties, ownership issues, infrastructure provision and physical
constraints.
Immediately Available – Land that has planning permission, is serviced and has no
major constraints to immediate development.  
4.5  As part of the preparation of the audit, discussions were held with Highlands and Islands
Enterprise (HIE), Moray Council Estates and agents working within the sector. The draft
audit was also made available for consultation on the Council’s website and sent to
internal and external consultees however, no comments were received during the
consultation period.   
5.  AUDIT FINDINGS  
5.1  The 2025 Audit is provided in full as APPENDIX 1 to the report.  The audit identifies that
there is 326.55 hectares (ha) of Gross Established Employment Land Supply.  This is a
Page 110

Page 111

decrease of 3.55ha compared to 2024 due to development at I7 Barmuckity/Elgin
Business Park, I2 Chanonry Industrial Estate, I2 Westerton Road South Keith for the
Cooperage and use of land for barrel storage at I7 Isla Bank Mills.  The main supply of
employment land continues to be within the Elgin, Forres and Buckie Market Areas, with a
more limited supply in Keith and in Speyside.  A summary for each Market Area can be
found on page 13 of the Audit.  
5.2  108.85 ha (net) of land, across 20 sites, is classed as Marketable/Effective.  This is an
increase of 10.17 ha compared to 2024. The increase in Marketable/Effective supply is due
to land at Easter New Forres I4 being taken out of the constrained supply due to a better
understanding of the site conditions and developable area. It should be noted that whilst
sites are identified as marketable/effective as set out within the Moray Business Property
Needs Study undertaken in 2023 servicing of sites will likely be reliant on externally
leveraged public sector intervention.      
5.3  The Marketable/Effective supply is split with 72.26ha suitable for general industrial and
36.59 ha suitable for proposals that require a higher amenity setting usually within the
class 4 Business category. The Elgin and Buckie market areas have relatively healthy
supplies of general industrial land providing at least the equivalent of 15 years supply. In
Forres there is limited choice of sites for general industrial land and delivery at I4 Easter
New Forres is important to maintain supply. Only a small portion of the BP1 Forres
Enterprise Park can accommodate general industrial uses. In Keith the general industrial
supply is more limited, however there is a LONG allocation that could be drawn down if
there is shortage. There is, and has historically been, a significant shortage of general
industrial land in Speyside. This means there is a reliance on windfall proposals to
accommodate demand.  
5.4  The amount of land Immediately Available is 32.15 ha (net), across 5 sites. The
immediately available supply increased by 0.21 ha compared to 2024. This is due to a
review of the available supply at Elgin Business Park/Barmuckity. Take up at I7 Elgin
Business Park/Barmuckity has been very good as reflected in previous audits. There is now
limited availability with many of these plots now developed, sold or under offer. It is
therefore anticipated that the level of immediately available land in the Elgin Market Area
will reduce over the next few years.  
5.5  There continues to be a restricted choice of sites in the Immediately Available Land
Supply. This is a particular issue in Forres and Speyside. The availability of Immediately
Available land is a Key Measure in the Moray Economic Strategy. To maintain a supply of
serviced sites it is necessary to work together with partners towards bringing other sites
forward through the LDP process as a failure to do so could inhibit economic growth.  
5.6  92.4ha (net) across 16 sites is classed as constrained.  This has decreased by 12.27
hectares since the 2024 audit due to the review of I4 Easter New Forres and the use of
land within I7 Isla Bank Mills. 48.06ha of land across 5 sites is classed as a LONG
designation and would be capable of being bought forward should the need arise as set
out within Policy DP3 Long Term Land Reserves within the MLDP 2020.  
5.7  3.47ha across 3 sites was completed in the year to 1st January 2025. This includes
completion or occupation of sites at I7 Barmuckity, at I2 Chanonry and occupation of land
at I7 Isla Bank Mills. This is an increase in construction compared to 2024 where 0.52ha
was completed but still lower than 2022 and 2021 (4.68 in 2021 and 4.74ha in 2022). A
number of planning applications have been approved over the audit year and it is
Page 111

Page 112

anticipated that take up of these will form part of the next audit.  
5.8  4.51ha across 4 sites is under construction on the base date of 1st January 2025. This is a
similar level of construction activity compared to 2024 (4.3ha) and on the higher end of
levels recorded in audits completed since 2015 which ranged from 2.31ha to 5.25ha. It is
noted that this does not represent all building activity, and only that on designated sites or
windfall sites that are not restricted to a single user.  
6.  OTHER DEVELOPMENT  
6.1 The employment land audit focusses on development within designated LDP sites                     
and any windfall sites unless they are constrained to a single user. Although not
highlighted in the audit it is worth noting that several large developments are currently
under construction or are proposed on undesignated sites in rural locations which are
significant contributors to the economy in Moray. These include a new distillery at
Miltonduff and whisky storage at land west of Glenrothes Distillery. There is also
significant development pressure around Portgordon in relation to the maltings and the
requirement for storage facilities. There is increasingly significant pressure from the energy
sector including battery energy storage systems, anaerobic digesters, and development to
support the National Grid. This has impacted on some industrial designations and rural
areas. This pressure is particularly prevalent in the Keith and Speyside areas but there has
been more interest in other towns such as Elgin and Buckie.  
6.2 These trends will be monitored through the LDP2020 Monitoring Report with the
implications for policy and designations considered in the preparation of the new LDP.  
7.  SUMMARY OF IMPLICATIONS  
7.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x 
Financial  x
Risk x 
Staffing  x
Best Value and Transformation  x
Property x 
Information Communications Technology/Digital  x
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact          x 
7.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
Page 112

Page 113

☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
7.3 Policy and Legal 
The preparation of the annual Employment Land Audit is a requirement of NPF4 to monitor
the effectiveness of the LDP and ensure an effective supply of employment land is
maintained.  
7.4 Financial 
None identified at present. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
7.5 Risk 
Risk that insufficient provision of effective employment land limits inward investment and
expansion opportunities and risks an unplanned approach being taken to development.  
7.6 Staffing 
Preparation of the annual Employment Land Audit is part of the workload of the Strategic
Planning and Development section.  
7.7 Best Value and Transformation 
None arising from this report.  
7.8 Property 
The Employment Land Audit includes industrial estates and sites owned by the Council.
The Council’s Estates section were consulted on the draft audit.  
7.9 Information Communications/Technology/Digital 
None  
Page 113

Page 114

7.10 Equalities, Social Inclusion and Economic Impact 
There are no equalities issues arising from this report as it is to inform the Committee on
monitoring of land supply.  
7.11 Climate Change and Biodiversity Impacts 
Moray Development Plan policies seek to ensure that biodiversity is enhanced and all new
buildings reduce carbon emissions. Development proposals are required to maximise
connections and routes for pedestrians/cyclists including connections to active travel
routes thereby reducing carbon emissions associated with vehicles, create green and blue
infrastructure and incorporate and enhance biodiversity through planting and other
mechanisms. 
National Planning Framework 4 (NPF4) has introduced national policies to bring significant
changes to the planning system including reducing carbon emissions in new
development, enhancing biodiversity and a much greater focus on brownfield
redevelopment. 
8.  CONSULTATION  
8.1 This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, the Head of Growth, Planning and Climate (Chief Planning Officer),
Service Manager Legal Services, L Rowan, Committee Services Officer, and the Chief
Financial Officer and are in agreement with the contents of the report/comments received
have been incorporated into the report.   
9.  BACKGROUND PAPERS  
9.1 
Page 114

Page 115

Moray Employment 
Land Audit
DRAFT
OCTOBER 2025
Page 115

Page 116

For further information, please contact:
keith.henderson@moray.gov.uk
Page 116

Page 117

Employment Land Audit 2025    1
1. Introduction 
1.1 Purpose of Audit
The Moray Employment Land Audit provides an overview of the supply and availability of
employment land across the Moray Local Development Plan area. The audit is an annual document
and includes figures for take up and sites under construction. 
The audit provides an evidence base for the monitoring and review of policies and proposals included
within the Local Development Plan. In addition, it can help to identify areas where further analysis and
investigation is required. The baseline against which information is analysed is 1st January 2025. 
The information contained in the Employment Land Audit will also be of use to businesses,
developers, and other organisations with an interest in employment land in Moray. 
1.2 Methodology
The audit is prepared from information gathered by Council planning officers through monitoring of
the development plan, planning approvals and individual inspections. 
All employment sites in the existing local development plan have been recorded in a data base, unless
the site has been built out in its entirety. In addition to sites allocated in the Moray Local Development
Plan 2020 any windfall sites with planning consent for employment uses have been added to the
database unless these are constrained to a single user (e.g. a distillery). It is noted that land with
buildings that are vacant are not included in the audit nor are redeveloped sites. 
Once sites have been identified officers undertake a review of planning applications and collect
information such as ownership, proposed use etc. for each site. Officers also undertake site visits to
monitor development activity. This information is then updated in the data base. The data is then
analysed to produce the audit report. 
Page 117

Page 118

2   Employment Land Audit 2025
2. Background 
2.1 National Planning Framework 4 (NPF4)
NPF4 was adopted on 13 February 2023 and now forms part of local development plans and sets out the
Scottish Government’s policies in relation to supporting economic development in Scotland.   
NPF4 requires LDP’s to allocate sufficient land for business and industry, taking into account business
and industry land audits, to ensure that there is a suitable range of sites that meet current market
demand, location, size, and quality in terms of accessibility and services.  This allocation should take
account of local economic strategies and broader objectives of delivering a low carbon and net zero
economic recovery, and a fairer and more inclusive economy. 
NPF4 requires LDP’s to identify suitable sites for business, general industrial and storage and distribution
uses and to enable alternative ways of working such as home working, live-work units and micro
businesses.  The ELA is undertaken annually to monitor the location, size, planning status, existing use,
neighbouring land uses and any significant land use issues of sites within the existing business land
supply which is fed into the review of the LDP. 
2.2 Moray Local Development Plan
NPF4 and the Moray Local Development Plan 2020 form the statutory Development Plan for Moray.  LDP’s
already adopted will continue to be part of the development plan and existing LDP land allocations will
be maintained.  The Moray Local Development Plan 2020 was adopted on 27 July 2020 and designates
land for employment uses within towns. Sites from the 2020 plan were first included in the 2020 audit.   
The adoption of NPF4 introduces a change to the requirements for Local Development Plans given that
there is now a suite of national policies forming part of the Local Development Plan for which planning
applications will be determined against.   
The Moray Local Development Plan 2020 already sets out the employment land policies for the Planning
Authority (excluding the Cairngorms National Park area) related to economic development.  These seek
to safeguard employment land and support development of employment uses on designated sites. The
policies also look at the types of uses that will be supported on designated sites. A more flexible
approach to rural business proposals is provided for, with policy criteria used to ensure the most
appropriate locations are supported in rural areas. 
Page 118

Page 119

Employment Land Audit 2025    3
2.3 Moray Economic Strategy and Moray Economic Partnership
The Moray Economic Strategy was published in November 2022. The strategy takes account of
changes in the economic landscape since 2012.  The strategy is for the period 2022-2032 and
maintains the overall objective to grow and diversify the economy and focuses on achieving four
outcomes, one of which is supporting the economy through the provision of employment land for
businesses of all sizes to locate. The Moray Economic Partnership aim to support and diversify the
economy by delivering early economic activity that is aligned to the aims of the Moray Economic
Strategy. 
2.4 Moray 10 Year Plan - Local Outcome Improvement Plan (LOIP) 
One of four priorities within the Moray Community Planning Partnership Local Outcomes
Improvement Plan is “Developing a diverse, inclusive and sustainable economy.” Whilst employment
land supply is not a performance indicator within the Local Outcomes Improvements Plan land supply
is important for achieving outcomes. 
2.5 Demand for Employment Land
Discussions with Moray Council Estates, Highlands and Islands Enterprise (HIE) and local agents indicate
that, while overall market activity is steady, demand is most evident for smaller sites and units, with
enquiries “ticking over” at a consistent rate. This reflects the needs of small local businesses such as trades,
plant hire, and service firms, as well as contractors seeking temporary yard, compound and laydown
space linked to major infrastructure works, including ongoing powerline upgrades. 
High construction costs combined with limited rental growth continue to suppress speculative
development and private sector investment. There is a general view that assistance will be required
across Moray to open up serviced land and create viable development opportunities, particularly in
locations where immediate supply is constrained. In sectoral terms, demand from the whisky industry,
which has driven significant expansion in recent years appears to have slowed in the short term, although
further growth is possible over the medium term given the sector’s long-term importance to Moray’s
economy. Other key sectors expected to influence future demand include engineering, technology, and
advanced manufacturing. 
Potential future influences on the market include the impacts of the emerging Green Freeport
designation. While there is a perception that adequate land exists within the designated area itself, any
“downstream” demand for supply chain sites in Moray, particularly the west of the region, may take time
to materialise. The eventual route of the A96 dualling will also be a significant consideration when
identifying and safeguarding future employment sites. 
Overall, while enquiries for large-scale sites remain limited, there is an ongoing need for a range of site
sizes and building types to ensure that both local growth and inward investment opportunities can be
accommodated. Unlocking strategic and serviced land across the region will be key to meeting identified
demand and supporting the ambitions of the Moray Economic Strategy. 
Page 119

Page 120

4   Employment Land Audit 2025
3. Employment Land Supply 
Several categories of land supply are identified in the audit. Definitions for these are provided in
section 5. 
Detailed information of the established, constrained, effective and immediately available sites is
provided in Appendix 2. 
3.1 Established Employment Land Supply
The established employment land supply for Moray is shown in figure 1. There has been a decrease in
the gross established supply by 3.55 ha since 2024.  This decrease is due to development at I7
Barmuckity/Elgin Business Park, I2 Chanonry Industrial Estate, I2 Westerton Road South Keith for the
Cooperage and use of land for barrel storage at I7 Isla Bank Mills.   
Figure 1 Established Employment Land Supply (2025) (Figures in hectares) 
Gross Established Net Established Number of Sites
326.55 249.86 36
Page 120

Page 121

Employment Land Audit 2025    5
The established employment land supply is broken down in figure 2 by market area.
Figure 2 Established Employment Land Supply by town (2025) (Figures in hectares)
Town Gross Established Net Established Number of Sites
Elgin Market Area 201.37 154.78 19
Elgin 123.52 93.49 11
Lossiemouth 12.8 10.24 1
Mosstodloch 63.44 49.95 6
Troves 1.61 1.1 1
Forres 55.48 36.34 4
Buckie Market Area 43.96 37.46 6
Buckie 43.15 36.81 5
Cullen 0.81 0.65 1
Keith 7.69 6.64 4
Speyside  Market Area 18.05 14.64 3
Aberlour 1 1 1
Rothes 17.05 13.64 2
ELGIN MARKET AREA -There has been a small decrease in the established supply within the Elgin Market
area compared to 2024 (0.66ha to the gross supply and 0.66ha to the net supply). This is as a result of
development at I7 Barmuckity/Elgin Business Park and at Chanonry Industrial Estate. 
FORRES MARKET AREA - There has been no change to the gross established supply in Forres Market Areas
compared to 2024, but there has been a small increase in the net established area by 1.57 ha following
review of the I4 Easter New Forres site. 
BUCKIE MARKET AREA - There has been no change to the established supply in the Buckie Market Areas
compared to 2024. 
KEITH MARKET AREA - There has been a decrease of 2.89ha of the gross and 2.48ha of the net supply due to
construction of the new Cooperage and use of land at Isla Bank Mills. 
SPEYSIDE MARKET AREA - There has been no change to the established supply in the Speyside Market
Areas compared to 2024. 
Page 121

Page 122

6   Employment Land Audit 2025
\
The established employment land supply has also been broken down by size of site to provide an indication
of the range of size of sites available. 
Figure 3: Established Employment Land Supply by site size (2025) (Figures in hectares) 
Site area Net Established Number of Sites
0 - 1ha 5.23 7
1 - 5 ha 23.72 12
>5 ha 220.91 17 
The land supply is broken down by the type of employment uses that are considered suitable on the site. The
greatest proportion of land is suitable for Class 5 General Industrial uses and also Class 4 Business and Class 6
Storage and Distribution. On some designations the whole area may be capable of accommodating higher
amenity or a greater mix of uses but on some designations distinct areas within a site are identified. These tend
to be uses within Class 4 that require a higher amenity setting or due to the location close to residential
development general industrial uses would not be suitable. On some larger sites a greater mix of uses (for
example Class 1 Shops where ancillary to main use, Class 4 Business, Class 5 General Industrial, Class 6 Storage
or Distribution, Class 7 Hotel and Hostels and Use Class 11 Assembly and Leisure) are identified on part of the
site to help support delivery of the site as a whole. A breakdown of the type of sites is shown in figures 4 and 5
below. It is noted that some sites will be counted in both the General Industrial and High Amenity figures as on
larger sites part of the site may be identified for a greater mix of uses. 
Figure 4: Net supply by type (2025). Figures in hectares 
Net Area Number of Sites
General Industrial 194.55 30
High Amenity 55.16 11 
Page 122

Page 123

Employment Land Audit 2025    7
Figure 5: Net supply by Market Area and type (2025). Figures in hectares 
Market Area                General Industrial Number of Sites High Amenity Number of Sites
Elgin                                          119.51 17 35.12 6
Elgin                                             63.34 9 30 5
Lossiemouth                             5.12 1 5.12 1
Mosstodloch                            49.95 6
Troves                                            1.1 1
Forres                                         26.07 4 10.27 1
Buckie                                        30.44 4 7.02 2
Buckie                                         30.44 4 6.37 1
Cullen                                                0.65 1
Keith                                            4.89 3 1.75 2
Speyside                                   13.64 2 1 1
Aberlour                                           1 1
Rothes                                         13.64 2
3.2 Marketable/Effective Employment Land Supply
The marketable and effective employment land supply in 2025 is shown in figure 6. Overall the
marketable/effective area has increased by 10.17 hectares compared to 2024. The increase in effective
supply is due to land at Easter New Forres I4 being taken out of the constrained supply due to a better
understanding of the site conditions and developable area. 
Figure 6: Marketable/Effective Employment Land Supply (2025) 
Marketable/Effective (Net figure in hectares) Number of Sites
108.85 20 
Page 123

Page 124

8   Employment Land Audit 2025
The marketable/effective employment land supply has been broken down by market area in figure 7. 
Annual requirements established through historic demand studies, build out rates recorded in
previous audits, and from discussions with HIE and Moray Council Estates have been used to provide
the estimated number of years supply available. It is noted that previously it was desirable to have a
five year effective land supply at all times and therefore previous Local Development Plans sought to
designate a minimum of 10 year land supply. However, to ensure a generous supply, increase choice
and the prospect of a 10 year replacement period for future Local Development Plans, the Moray Local
Development Plan 2020 sought to designate a minimum of 15 years supply. 
Figure 7 Marketable/Effective Employment Land Supply by market area (2025) 
Market Area Marketable/ Number Estimated  Available Supply 
Effective (Net of Sites Annual in years 
figure in hectares) Requirements
Elgin 56.75 10 2.8 20 years
Forres 25.02 2 0.8 31 years
Buckie 22.34 4 0.8 28 years
Keith 3.14 2 0.4 8 years
Speyside 1.6 2 0.4 4 years 
The level of effective supply in Elgin, Buckie and Forres is currently good. However, the choice of sites
is limited across all market areas. It is noted that within in Elgin there are only small areas now
available within I6 Linkwood East and I2 Chanonry.  The level of interest and recent planning
applications at I7 Barmuckity also suggests availability will be limited in the future as these
applications build out. In Forres whilst there is a good supply of land this is either at BP1 Forres
Enterprise Park or I4 Easter New Forres. Whilst Keith has less than 8 years supply there is a LONG
allocation that could be brought forward, however there is a limited choice of sites in Keith with these
primarily being in the Westerton Road area. There is a shortage of sites in Speyside and finding
suitable sites has been an ongoing issue. Removal of a site in the Examination of the 2020 Local
Development Plan means there will be a reliance on windfall proposals within this area. 
The effective land supply is broken down by the type of employment uses that are considered suitable
on the site. The greatest proportion of land is suitable for Class 5 General Industrial uses (and also Class
4 Business and Class 6 Storage or Distribution). As set out above some sites are wholly or have areas
that would be capable of accommodating higher amenity uses or a greater mix of uses. These tend to
be uses within Class 4 that require a higher amenity setting or due to the location of the site close to
residential development general industrial uses would not be suitable. On some larger sites areas that
could accommodate a greater mix of uses (for example Class 1 Shops where ancillary to main use,
Class 4 Business, Class 5 General Industrial, Class 6 Storage or Distribution, Class 7 Hotel and Hostels
Page 124

Page 125

Employment Land Audit 2025    9
and Use Class 11 Assembly and Leisure) are identified to help support delivery of the site as a whole. A
breakdown of the type of sites is shown in figures 8 and 9 below. It is noted that some sites will be
counted in both the General Industrial and High Amenity figures as on larger sites part of the site may
be identified for a greater mix of uses. 
Figure 8: Effective area by type (2025) Figures in hectares. 
Effective Area Number of Sites
General Industrial 72.26 15
High Amenity 36.59 8
Figure 9: Effective area by Market Area and type (2025). Figures in hectares. 
Market Area General Industrial Number of Sites High Amenity Number of Sites
Elgin 40.2 9 16.55 3
Elgin 26.3 7 16.55 3
Mosstodloch 12.8 1
Troves 1.1 1
Forres 14.75 2 10.27 1
Buckie 15.32 2 7.02 2
Buckie 15.32 2 6.37 1
Cullen 0.65 1
Keith 1.39 1 1.75 1
Speyside 0.6 1 1 1
Aberlour 1 1
Rothes 0.6 1
The Elgin and Buckie market areas have relatively healthy supplies of general industrial land providing
the equivalent of around 15 years supply. In Forres there is limited choice of site for general industrial
land and delivery at I4 Easter New Forres is important to maintain supply.  Only a small portion of the
BP1 Forres Enterprise Park can accommodate general industrial uses. In Keith the general industrial
supply is more limited however there is a LONG allocation that could be drawn down if there is
shortage. There is, and has historically been, a significant shortage of general industrial land in
Speyside. This means there is a reliance on windfall proposals to accommodate demand. 
Page 125

Page 126

10   Employment Land Audit 2025
3.3 Immediately Available
The immediately available employment land supply in 2025 is shown in figure 10. The immediately
available supply increased by 0.21 ha compared to 2024. This is due to a review of the available supply
at Elgin Business Park/Barmuckity. 
Figure 10: Immediately available Employment Land Supply (2025) 
Immediately Available (Net figure in hectares) Number of Sites
32.15 5
3.4 LONG
The Moray Local Development Plan 2020 included LONG employment sites for the first time. The
LONG supply is set out in figure 11 below.  These sites set out the direction of growth and assist in
forward planning. LONG sites are designated at LONG3 Burnside of Birnie Elgin, LONG MU1 South of
the A96, LONG 2 West of Mosstodloch, LONG 2 Westerton Road Keith and LONG2 March Road. 
Figure 11:  LONG sites 2025 
LONG (Net figure in hectares) Number of Sites
48.06 5
3.5 Constrained
The established land supply that is subject to constraints is shown in figure 12. This has decreased by
12.27 hectares since the 2024 audit this is due to the review of I4 Easter New Forres and the use of land
within I7 Isla Bank Mills. 
Page 126

Page 127

Employment Land Audit 2025    11
Figure 12: Constrained Employment Land Supply (2025) 
Constrained Supply (Net figure in hectares) Number of Sites
92.4 16 
The constrained supply can be broken down into the type of constraints identified. 
Figure 13: Constrained Employment Land Supply by constraint (2025) (Net figures in hectares) Note some land may fall under
more than one constraint. 
Constraint Type Constrained Supply Number of Sites
Infrastructure 35.32 8
Ownership 40.79 6
Physical 49.71 10 
3.6 Take up and Construction
The number and area of proposals completed in the year to 1st January 2025 is shown in figure 14
below. This includes completion or occupation of sites at I7 Barmuckity, at I2 Chanonry and
occupation of land at I7 Isla Bank Mills. This is an increase in construction compared to 2024 where
0.52ha was completed but still lower than 2022 and 2021 (4.68 in 2021 and 4.74ha in 2022).  A number
of planning applications have been approved over the audit year and it is anticipated that take up of
these will form part of the next audit.    
Figure 14 Employment land completed/taken up in year to 1st January 2025
Take up area (Gross figure in hectares) Number of Sites
3.47 3
The number and area of proposals under construction on the base date of 1st January 2025 is shown
in figure 15 below.  This is a similar level of construction activity compared to 2024 (4.3ha) and on the
higher end of levels recorded in audits completed since 2015 which ranged from 2.31ha to 5.25ha. 
Page 127

Page 128

12   Employment Land Audit 2025
Figure 15: Employment land under construction at 1st January 2025 
Under Construction (Gross figure in hectares) Number of Sites
4.51 4
It is noted that this does not represent all building activity, and only that on designated sites or windfall sites
that are not restricted to a single user. Other notable areas of activity primarily relate to expansion proposals
of existing businesses, sites in the countryside and expansion of distilleries. 
4. Conclusion 
The Employment Land Audit has been carried out in this format for several years allowing comparison to be
made to previous audits. 
It is clear that the emphasis on employment land continues to be within the main settlements of Elgin, Forres,
Buckie and Keith. However, Mosstodloch is also the focus of a large proportion of the supply in the Elgin
Market Area. The delivery of sites for general industrial use in Forres is necessary. There is a significant
shortage of land and sites within the Speyside Market Areas which means there is a reliance on windfall sites
to accommodate demand.   
Around 37% (92 ha) of the Established Supply has some form of constraint that is likely to prevent the land
being brought forward in the next five years and this is a slight increase from 2024.   
There continues to be a limited choice of serviced sites/immediately available sites across all settlements with
only 5 sites being classed in this category. A number of consents were approved on identified sites in 2023
and 2024 along with a number of sites which are now deemed to be under construction.  It is anticipated that
several of these will be implemented and brought forward which will be reflected in next year’s ELA. 
The availability of Immediately Available employment land is a Key Measure in the Moray Economic Strategy
and will be a focus for the next Moray Local Development Plan. 
In figure 16 below is a summary by market area. 
Page 128

Page 129

Employment Land Audit 2025    13
Elgin (including
Lossiemouth and
Mosstodloch) 
Forres
Development at Barmuckity/Elgin Business Park (I7) is progressing with several
plots now completed and others currently under construction. There continues
to be significant interest in the remaining plots, including some of the larger
plots. The high levels of take up at Elgin Business Park/Barmuckity (I7) suggest
the level of Immediately Available land will reduce significantly over the next few
years and therefore bringing new sites forward and servicing these is critical to
maintaining a supply of serviced sites. 
At Chanonry (I2) and Linkwood East (I6) there are small areas of immediately
available land but this has reduced to only a couple of small plots on each site
available. Land at Chanonry is understood to be under offer.  At Chanonry there
is a private development of 18 starter units that have been built and is now
largely occupied. At OPP4 Ashgrove three general industrial and storage and
distribution buildings (including ancillary trade counters) have been built and
occupied. 
Bringing forward other sites within Elgin will be critical to maintaining a choice
of immediately available sites. To the north of Elgin Newfield (I8) is being actively
marketed increasing choice of sites across Elgin. Land has been identified at
Burnside of Birnie (I16/LONG3) to meet future demand. 
Choice of sites is severely restricted in Lossiemouth, only Sunbank OPP1 or
windfall opportunities are available. The topography and ground conditions at
Sunbank OPP1 are considered to constrain the site. 
In Mosstodloch additional land is identified at I3 West of Mosstodloch and there
are discussions ongoing with the landowner regarding the site. 
There are issues with delivery of higher quality business land. Strong demand
continues for industrial buildings.   
Very small choice of marketable/effective sites given settlement size and
population, but reasonable areas available at the BP1 Enterprise Park.  I4 Easter
Newforres is understood to have high infrastructure costs that will likely require
public sector funding support to make this site effective.   
There is continued interest in sites at BP1 Enterprise Park. HIE are looking to
implement the consent they have for two small business units in the northwest
of BP1. 
Figure 16 Market Area Summary
Page 129

Page 130

14   Employment Land Audit 2025
The remaining land at Waterford (I2) is constrained due to restricted access. 
Strong demand, particularly for smaller units and need for serviced employment
land to allow businesses to develop and relocate from smaller units. 
Small choice of marketable sites but reasonable areas available. Significant area
immediately available at I3 Rathven Industrial Estate. Redevelopment
opportunities at harbour, as identified in the Buckie Harbour Masterplan. Small
site available at Cullen. 
The Moray Local Development Plan identifies a reserve of industrial land at
March Road (LONG2) that could be brought forward if need arose. 
Very small choice of marketable sites focussed around the Westerton Road area.
Issues with providing readily accessible employment sites. Demand for smaller
units but greatest demand is currently for battery storage and development
linked to Blackhillock, where the Keith Green Energy and Infrastructure
Framework has now been completed. 
A cooperage including office staff facilities storage yard and associated works
was approved on the I4 Bridge Street designation. The development has
commenced. 
Opportunities for higher amenity employment uses promoted within a mixed
use site to the south of Banff Road (MU). 
Severely limited choice of designated sites. There is a need for sites for small local
businesses in Speyside. The Moray Local Development Plan 2020 identifies a site
at Speyview (R2) where 1ha of the housing site is identified for employment
uses. The removal of a site during the Examination of the Moray Local
Development Plan 2020 means there is a reliance on windfall proposals
supported through policy. Growth in the whisky sector has resulted in demand
for significant storage facilities which given the lack of designated land has
resulted in significant unplanned development on windfall sites. Identification of
larger sites to meet future demand of this type would allow for a planned
approach to be taken. 
Forres 
Buckie 
Keith 
Speyside
Page 130

Page 131

Employment Land Audit 2025    15
5. Glossary 
Constrained Employment Land Supply 
This includes land for example, that has planning
difficulties, land subject to ownership difficulties
(e.g. multiple ownership/unwilling sellers), land
with insufficient infrastructure provision, etc. This
category therefore includes much of the land in
the Established Employment Land Supply that is
not Marketable (see below). 
Employment Land
This includes land for general industrial and
business/office use, storage and distribution uses,
business parks and specialist technology parks
including research and development uses. This
comprises Classes 4 (Business), 5 (General
Industrial) and 6 (Storage or Distribution) of the
1997 Town and Country Planning (Use Classes)
(Scotland) Order, but is not exclusive to these uses. 
Established Employment Land Supply 
This includes all undeveloped land that is
allocated for industrial/business/ employment use
in the adopted Local Plan or has a valid planning
approval for these uses. 
Gross
This refers to the total area in (hectares) within the
boundary of the site. 
Immediately Available Land Supply 
This is marketable/effective land that currently has
planning permission, is serviced and has no other
major constraints to immediate development. This
definition is useful in the assessment of whether
demand for land is being adequately met. 
Marketable/Effective Land Supply 
This is land that as well as meeting business
requirements, has a secure planning status, can be
serviced within 5 years, is accessible by walking,
cycling and public transport as defined by SPP.
Land that is subject to user restrictions or that is
held as ‘option land’ for existing companies’ own
expansion cannot be considered to be
marketable. Such land is not constrained. 
Net
The total area of land excluding roads,
landscaping etc. As the physical attributes of a site
and surrounding land uses will determine the area
suitable for development and the level of
landscaping required the net area will vary. For
sites that are partially complete, the net area given
is the area that is actually available to be
developed. For sites that are undeveloped the net
area is estimated. This estimate is based on an
assumption that on average, 20% of available land
will be taken up with roads, landscaping etc. If
relevant site information is available, this is taken
into account in the estimate. 
Take-Up
The take up figure includes all proposals where
development has been completed within the
particular year. 
Under Construction
This is the area of land under construction at the
base date. These sites are not yet complete. The
area under construction area is not included
within the land supply or built totals.
Page 131

Page 132

The Moray Council Employment Land Audit2025
Reference: M/AB/E/005
Location: Speyview
Grid Ref: 325631 841602
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ABERLOUR
Effective Supply (Ha):
Effective: 1
Immediately Available: 0
LPR: 20/R2
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 1 Net Established: 1
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 1
Reference: M/BC/E/001
Location: High Street (W)
Grid Ref: 342942 864437
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: BUCKIE
Effective Supply (Ha):
Effective: 6.37
Immediately Available: 0
LPR: 20/MU
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 6.37 Net Established: 6.37
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 6.37
Page 132

Page 133

The Moray Council Employment Land Audit2025
Reference: M/BC/E/004
Location: March Road (SE)
Grid Ref: 343984 865510
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: BUCKIE
Effective Supply (Ha):
Effective: 14.55
Immediately Available: 7.95
LPR: 20/I3
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 17.69 Net Established: 14.55
Development (Ha):
Built: 3.14 Under Construction: 0
LONG: 0
General Industrial: 14.55
High Amenity: 0
Reference: M/BC/E/005
Location: Maltings
Grid Ref: 343676 865357
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: BUCKIE
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I4
LONG Supply (Ha):
Constrained Total (Ha): 8.5
Established Supply (Ha):
Gross Established: 10.3 Net Established: 8.5
Development (Ha):
Built: 5.96 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Page 133

Page 134

The Moray Council Employment Land Audit2025
Reference: M/BC/E/006
Location: The Harbour Area
Grid Ref: 343086 865957
Supply Type: Part Constrained
Constrained
Owner Infrastructure Physical
Town: BUCKIE
Effective Supply (Ha):
Effective: 0.77
Immediately Available: 0
LPR: 20/I5
LONG Supply (Ha):
Constrained Total (Ha): 1
Established Supply (Ha):
Gross Established: 1.77 Net Established: 1.77
Development (Ha):
Built: 20.97 Under Construction: 0
LONG: 0
General Industrial: 0.77
High Amenity: 0
Reference: M/BC/E/007
Location: March Road (LONG)
Grid Ref: 344222 865018
Supply Type: Effective 5years+
Constrained
Owner Infrastructure Physical
Town: BUCKIE
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/LNG2
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 7.02 Net Established: 5.62
Development (Ha):
Built: 0 Under Construction: 0
LONG: 5.62
General Industrial: 0
High Amenity: 0
Page 134

Page 135

The Moray Council Employment Land Audit2025
Reference: M/CL/E/002
Location: South of Cemetery
Grid Ref: 351482 866184
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: CULLEN
Effective Supply (Ha):
Effective: 0.65
Immediately Available: 0
LPR: 20/I1
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 0.81 Net Established: 0.65
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0.65
Reference: M/EL/E/001
Location: Elgin Business Park, Barmuckity
Grid Ref: 324719 861725
Supply Type: Part Constrained
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 15.63
Immediately Available: 9.34
LPR: 20/I7
LONG Supply (Ha):
Constrained Total (Ha): 5.86
Established Supply (Ha):
Gross Established: 32.57 Net Established: 21.02
Development (Ha):
Built: 2.9 Under Construction: 1.56
LONG: 0
General Industrial: 9.68
High Amenity: 5.95
Page 135

Page 136

The Moray Council Employment Land Audit2025
Reference: M/EL/E/002
Location: Riverview
Grid Ref: 319633 862782
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/MU1
LONG Supply (Ha):
Constrained Total (Ha): 3.3
Established Supply (Ha):
Gross Established: 4.12 Net Established: 3.3
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Reference: M/EL/E/004
Location: Glen Moray Distillery
Grid Ref: 319932 862424
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I12
LONG Supply (Ha):
Constrained Total (Ha): 1.3
Established Supply (Ha):
Gross Established: 1.3 Net Established: 1.3
Development (Ha):
Built: 6.5 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Page 136

Page 137

The Moray Council Employment Land Audit2025
Reference: M/EL/E/008
Location: Chanonry Industrial Estate
Grid Ref: 323161 862960
Supply Type: Part Constrained
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 0.44
Immediately Available: 0.44
LPR: 20/I2
LONG Supply (Ha):
Constrained Total (Ha): 1.22
Established Supply (Ha):
Gross Established: 2.94 Net Established: 1.66
Development (Ha):
Built: 10.36 Under Construction: 0
LONG: 0
General Industrial: 0.44
High Amenity: 0
Reference: M/EL/E/011
Location: Pinefield Industrial Estate
Grid Ref: 322991 862330
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 0.18
Immediately Available: 0
LPR: 20/I5
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 0.18 Net Established: 0.18
Development (Ha):
Built: 12.23 Under Construction: 0
LONG: 0
General Industrial: 0.18
High Amenity: 0
Page 137

Page 138

The Moray Council Employment Land Audit2025
Reference: M/EL/E/012
Location: Linkwood East
Grid Ref: 323707 862498
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 1.4
Immediately Available: 1.4
LPR: 20/I6
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 1.71 Net Established: 1.4
Development (Ha):
Built: 2.01 Under Construction: 0
LONG: 0
General Industrial: 1.4
High Amenity: 0
Reference: M/EL/E/016
Location: Newfield
Grid Ref: 321907 864903
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 9.6
Immediately Available: 0
LPR: 20/I8
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 12 Net Established: 9.6
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 9.6
High Amenity: 0
Page 138

Page 139

The Moray Council Employment Land Audit2025
Reference: M/EL/E/017
Location: Burnside of Birnie
Grid Ref: 322206 859613
Supply Type: Part Constrained
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 9
Immediately Available: 0
LPR: 20/I16
LONG Supply (Ha):
Constrained Total (Ha): 8.87
Established Supply (Ha):
Gross Established: 22.3 Net Established: 17.87
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 4
High Amenity: 5
Reference: M/EL/E/018
Location: Burnside of Birnie (LONG)
Grid Ref: 322279 859158
Supply Type: Part Constrained
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/LNG3
LONG Supply (Ha):
Constrained Total (Ha): 9.8
Established Supply (Ha):
Gross Established: 38.2 Net Established: 30.56
Development (Ha):
Built: 0 Under Construction: 0
LONG: 20.74
General Industrial: 0
High Amenity: 0
Page 139

Page 140

The Moray Council Employment Land Audit2025
Reference: M/EL/E/019
Location: Lossiemouth Road (NE)
Grid Ref: 321871 865361
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 5.6
Immediately Available: 0
LPR: 20/MU2
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 7 Net Established: 5.6
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 5.6
Reference: M/EL/E/020
Location: Ashgrove Road (Yard)
Grid Ref: 322589 862554
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ELGIN
Effective Supply (Ha):
Effective: 1
Immediately Available: 0
LPR: 20/OPP4
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 1.2 Net Established: 1
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 1
High Amenity: 0
Page 140

Page 141

The Moray Council Employment Land Audit2025
Reference: M/FR/E/001
Location: Forres Enterprise Park
Grid Ref: 306378 859307
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: FORRES
Effective Supply (Ha):
Effective: 13.02
Immediately Available: 13.02
LPR: 20/BP1
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 22.88 Net Established: 13.02
Development (Ha):
Built: 17.92 Under Construction: 0.16
LONG: 0
General Industrial: 2.75
High Amenity: 10.27
Reference: M/FR/E/006
Location: Benromach Distillery
Grid Ref: 303187 859423
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: FORRES
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I3
LONG Supply (Ha):
Constrained Total (Ha): 3.2
Established Supply (Ha):
Gross Established: 4 Net Established: 3.2
Development (Ha):
Built: 4 Under Construction: 1.3
LONG: 0
General Industrial: 0
High Amenity: 0
Page 141

Page 142

The Moray Council Employment Land Audit2025
Reference: M/FR/E/013
Location: Waterford
Grid Ref: 303151 859195
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: FORRES
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I2
LONG Supply (Ha):
Constrained Total (Ha): 0.8
Established Supply (Ha):
Gross Established: 1 Net Established: 0.8
Development (Ha):
Built: 6.2 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Reference: M/FR/E/014
Location: Easter Newforres
Grid Ref: 306670 859033
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: FORRES
Effective Supply (Ha):
Effective: 12
Immediately Available: 0
LPR: 20/I4
LONG Supply (Ha):
Constrained Total (Ha): 7.32
Established Supply (Ha):
Gross Established: 27.6 Net Established: 19.32
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 12
High Amenity: 0
Page 142

Page 143

The Moray Council Employment Land Audit2025
Reference: M/KH/E/004
Location: Bridge Street
Grid Ref: 343609 850228
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: KEITH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I4
LONG Supply (Ha):
Constrained Total (Ha): 1
Established Supply (Ha):
Gross Established: 1 Net Established: 1
Development (Ha):
Built: 1.72 Under Construction: 0.97
LONG: 0
General Industrial: 0
High Amenity: 0
Reference: M/KH/E/011
Location: Westerton Road East Expansion
Grid Ref: 343761 850329
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: KEITH
Effective Supply (Ha):
Effective: 1.39
Immediately Available: 0
LPR: 20/I11
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 1.74 Net Established: 1.39
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 1.39
High Amenity: 0
Page 143

Page 144

The Moray Council Employment Land Audit2025
Reference: M/KH/E/012
Location: Westerton Road (LONG)
Grid Ref: 343822 850218
Supply Type: Effective 5years+
Constrained
Owner Infrastructure Physical
Town: KEITH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/LNG2
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 3.2 Net Established: 2.5
Development (Ha):
Built: 0 Under Construction: 0
LONG: 2.5
General Industrial: 0
High Amenity: 0
Reference: M/KH/E/013
Location: Banff Road South
Grid Ref: 343847 850958
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: KEITH
Effective Supply (Ha):
Effective: 1.75
Immediately Available: 0
LPR: 20/MU
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 1.75 Net Established: 1.75
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 1.75
Page 144

Page 145

The Moray Council Employment Land Audit2025
Reference: M/LS/E/007
Location: Sunbank
Grid Ref: 323075 869644
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: LOSSIEMOUTH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/OPP1
LONG Supply (Ha):
Constrained Total (Ha): 10.24
Established Supply (Ha):
Gross Established: 12.8 Net Established: 10.24
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Reference: M/MS/E/003
Location: Baxters
Grid Ref: 333948 859705
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: MOSSTODLOCH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I5
LONG Supply (Ha):
Constrained Total (Ha): 1.78
Established Supply (Ha):
Gross Established: 2.22 Net Established: 1.78
Development (Ha):
Built: 12.05 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Page 145

Page 146

The Moray Council Employment Land Audit2025
Reference: M/MS/E/005
Location: North of Baxter's
Grid Ref: 333613 860016
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: MOSSTODLOCH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/I2
LONG Supply (Ha):
Constrained Total (Ha): 2.57
Established Supply (Ha):
Gross Established: 3.22 Net Established: 2.57
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0
High Amenity: 0
Reference: M/MS/E/006
Location: South of A96
Grid Ref: 333268 859627
Supply Type: Effective 5years+
Constrained
Owner Infrastructure Physical
Town: MOSSTODLOCH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/MUL1
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 11 Net Established: 8
Development (Ha):
Built: 0 Under Construction: 0
LONG: 8
General Industrial: 0
High Amenity: 0
Page 146

Page 147

The Moray Council Employment Land Audit2025
Reference: M/MS/E/007
Location: West of Mosstodloch
Grid Ref: 331976 860333
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: MOSSTODLOCH
Effective Supply (Ha):
Effective: 12.8
Immediately Available: 0
LPR: 20/I3
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 16 Net Established: 12.8
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 12.8
High Amenity: 0
Reference: M/MS/E/008
Location: West of Mosstodloch (LONG)
Grid Ref: 331976 860549
Supply Type: Effective 5years+
Constrained
Owner Infrastructure Physical
Town: MOSSTODLOCH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR: 20/LNG2
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 14 Net Established: 11.2
Development (Ha):
Built: 0 Under Construction: 0
LONG: 11.2
General Industrial: 0
High Amenity: 0
Page 147

Page 148

The Moray Council Employment Land Audit2025
Reference: M/MS/E/009
Location: James Jones Expansion
Grid Ref: 333256 860661
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: MOSSTODLOCH
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR:
LONG Supply (Ha):
Constrained Total (Ha): 13.6
Established Supply (Ha):
Gross Established: 17 Net Established: 13.6
Development (Ha):
Built: 0 Under Construction: 0
LONG:
General Industrial:
High Amenity:
Reference: M/RS/E/001
Location: Back Burn
Grid Ref: 327876 849746
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: ROTHES
Effective Supply (Ha):
Effective: 0.6
Immediately Available: 0
LPR: 20/I1
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 0.75 Net Established: 0.6
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial: 0.6
High Amenity: 0
Page 148

Page 149

The Moray Council Employment Land Audit2025
Reference: M/RS/E/007
Location: Greens of Rothes
Grid Ref: 328029 850205
Supply Type: Constrained
Constrained
Owner Infrastructure Physical
Town: ROTHES
Effective Supply (Ha):
Effective: 0
Immediately Available: 0
LPR:
LONG Supply (Ha):
Constrained Total (Ha): 13.04
Established Supply (Ha):
Gross Established: 16.3 Net Established: 13.04
Development (Ha):
Built: 0 Under Construction: 0
LONG: 0
General Industrial:
High Amenity:
Reference: M/TV/E/001
Location: Troves Industrial Estate
Grid Ref: 324974 324974
Supply Type: Effective
Constrained
Owner Infrastructure Physical
Town: TROVES
Effective Supply (Ha):
Effective: 1.1
Immediately Available: 0
LPR: 20/I1
LONG Supply (Ha):
Constrained Total (Ha): 0
Established Supply (Ha):
Gross Established: 1.61 Net Established: 1.1
Development (Ha):
Built: 0 Under Construction:
LONG: 0
General Industrial: 1.1
High Amenity: 0
Page 149

Page 150

October 2025
Page 150

Page 151

Report to: Planning and
Regulatory Services
Committee
Meeting
Date:
16 December 2025
Report by: Executive Director Economy, Enterprise and Operations
Author: Rowena MacDougall Contact
Email:
localdevelopmentplan@moray.gov.uk
Subject: Moray Town Centre Health Check 2025
1. PURPOSE
☒ For Decision      ☐  For Information
1.1  The purpose of this report is to highlight the key findings of the Moray Town Centre Health
Check 2025 and recommend that the Moray Town Centre Health Check 2025 is adopted
as a material consideration in future retail planning policy and planning application
decision making.  
1.2  This report is submitted to Committee in terms of Section III (E) (2) of the Council’s
Scheme of Administration relating to the review or preparation of the Local Development
Plan. 
2. SUMMARY
2.1  Town Centre Health Checks have been undertaken every two years since 2010 (with the
exception of a delay in 2020 due to covid-19 restrictions). This has allowed indicators to be
monitored over time and data to be used as an evidence base for developing policy and
strategies to support town centres. Vacant retail units have increased in Elgin and Keith.
There was notable decrease in vacancies in Forres, with smaller reductions in vacancies
in Buckie and at Edgar Road, Elgin. Vacancies in Lossiemouth have remained the same.
The national trend of national multiple retailers moving out of town centres and a shift
towards increased leisure use has continued.
3. RECOMMENDATIONS
3.1  It is recommended that Committee:
i) note the findings of the Moray Town Centre Health Check 2025;
ii) adopt the Moray Town Centre Health Check 2025, as set out in Appendix 1, as
a material consideration in future retail planning policy and planning
application decision making; and
Item 8.
Page 151

Page 152

iii)  agree the publication of the Town Centre Health Check 2025 on the Planning
and Development website pages.   
Author Name Rowena MacDougall
Job Title Senior Planning Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Town centre audits or health checks are important to provide an evidence base of the
strengths, vitality and viability, weaknesses and resilience of our town centres. This
evidence base can be used to inform development plans and decisions on planning
applications. A Town Centre Health Check Framework was developed in 2010 in
conjunction with Hargest Planning Ltd and has been used to prepare biennial health
checks since 2010. Assessments are undertaken in the town centres of Elgin, Forres,
Keith, Buckie, and Lossiemouth. The Edgar Road area of Elgin is also assessed. Audits
were also undertaken in Aberlour, Dufftown, Fochabers, and Rothes.  
4.2  The Town Centre Health Check data:
• Provides an evidence base for use in other studies and strategies; 
• Supports the preparation and implementation of the Local Development Plan and
economic development policies; and 
• Provides a baseline for assessing the impacts of proposed regeneration projects.  
4.3  The principal sources of information used for gathering data are field surveys undertaken
during summer 2025 to record the occupier of units and the type of use (Space In Use
Survey). This allows assessment against three key vitality and viability indicators: diversity
of uses, vacancy rates, and retail representation. Retailer intentions, rate and yield data,
consumer surveys and turnover indicators have not been monitored due to the scale and
cost of undertaking the survey, the need for specialist consultants and the lack of
response in previous studies.  
4.4  Previous health checks have included an assessment of pedestrian flow. It has not been
possible to assess pedestrian flow since 2023 due to resource issues however it is
intended to resume this in 2026 when officers will have access to data from automatic
footfall counters in Elgin. 
4.5  Work has been ongoing on actions within the Town Centre Improvement Plans for
Aberlour, Buckie, Dufftown, Forres, Keith and Lossiemouth. This has included completion
of improvements to Aberlour public toilets led by the community association funded by
the Council, and installation of bespoke seating in Cluny Square Buckie supported by
Buckie High School and Forsyths. Design work for public realm improvements at Museum
Square Forres and Dufftown Square has also been completed. In consultation with Ward
Members funds have been reallocated to improve St Rufus park pavilion and toilets.
Supporting improvements to the appearance of town centres and bringing properties back
into use has been supported through the Town Centre Capital Grant Fund. An update on
progress with the Levelling Up Fund work within Elgin City Centre was reported to Council
on the 27 August 2025. (para 15 of the minute refers) 
5.  MORAY TOWN CENTRE HEALTH CHECK 2025  
5.1  The summary below provides an overview of the key finding of the 2025 health check. A
Page 152

Page 153

copy of the full health check is included at Appendix 1. 
5.2  ELGIN
For the first time the number of units occupied by leisure uses (i.e. restaurants, cafes,
pubs, cinemas etc) is higher than comparison retailing (i.e. clothes, gifts, furniture,
chemists etc). This change is a result of the St Giles Centre closure and reflects national
trends which show high vacancy rates in shopping centres particularly in middle sized
centres like Elgin. Comparison retailing and convenience retail (i.e. supermarkets,
butchers, newsagents etc) continue to make up a significant proportion of units and
occupy significant floor areas due to occupation of larger units by Tesco, Aldi and Marks
and Spencer. The city centre has a strong mix of independent retailers but is following
national trends with a fall in the number of national multiple retailers (e.g. Argos, WH
Smith, Waterstones and The Works have left the city centre).  
5.3  The number of vacant units recorded has increased from 40 in 2023 to 51 in 2025. This
gives a vacancy rate of 20%. Historically 10% vacancy has been used as being indicative of
a healthy centre. The St Giles Centre accounts for 26 of the vacant units and its closure
has seen 11 retailers not return to the town centre. Other vacancies since 2023 include
TUI travel agent, Shopmobility Moray, Sirology and Lloyds Pharmacy.  
5.4  EDGAR ROAD
At Edgar Road national multiples continue to be dominant within the two retail parks.
Vacancies have decreased by one to four units. All the vacancies are within Elgin Retail
Park. 
5.5  FORRES 
Forres has seen a significant positive shift since the last health check in 2023, with the
number of vacant units down from 18 to 7 in 2025. This is a vacancy rate of 7%.
Comparison retailing and retail services are the dominant use within Forres town centre
but leisure uses also make a significant contribution. 
5.6  KEITH 
Vitality and viability indicators in Keith have been relatively steady with the mix of uses
remaining largely the same but an increase in vacant units from seven in 2023 to 10 in
2025 is identified. The Barbers at 169 Mid Street and relocation of Kelpie Games from 109
to 119 Mid Street has resulted in new vacancies. The vacancy rate is 12%. 
5.7  BUCKIE
Comparison retailing still occupies the greatest number of units in Buckie. It is notable
that retail services have increased from 11 in 2021 to 20 in 2025 but leisure services have
decreased from 23 identified in 2021 to 18 in 2025. Seven vacant units were identified
within Buckie town centre, this is a decrease from 11 in 2023. This is a vacancy rate of
8.8%  
5.8  LOSSIEMOUTH
Leisure continues to be the dominant use in Lossiemouth with reasonable levels of
comparison and retail services identified. Five vacant units were identified, which is a
vacancy rate of 9.4% and comparable to vacancies in 2023. Notable changes include
Moray Driftwood Designs occupying 33 King Street, The Pier coffee shop occupying the
former Ladbrokes near the harbour and Moray Coastal Flooring moving to larger premises
to the former Bank of Scotland on Queen Street.    
Page 153

Page 154

5.9  SMALLER SETTLEMENTS (ABERLOUR, DUFFTOWN, FOCHABERS AND ROTHES)
A significant proportion of the uses in the centre of Moray’s smaller towns are Leisure
Services, with Comparison and Retail Services also contributing to the mix. Convenience
shopping needs are provided for by a number of smaller stores, such as the Co-operative
stores in Aberlour, Dufftown and Fochabers. Rothes is serviced by a Keystore and
Morrisons.  One vacancy was identified in Aberlour and Fochabers, ten in Dufftown (an
increase from 5 in 2023) and seven in Rothes (an increase from 5 in 2023). 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal x 
Financial  x
Risk x 
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital  x
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact        x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
If approved the Moray Town Centre Health Check Report 2025 would be a material
consideration in any relevant future planning applications.  
Page 154

Page 155

6.4  Financial 
There are no direct financial implications from this report. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
The risk of not monitoring the health of town centres would be an out of date evidence
base being used for preparing strategies.  
6.6  Staffing 
The field study and analysis of space in use was completed by officers within Strategic
Planning and Development. 
6.7  Best Value and Transformation 
None arising from this report. 
6.8  Property 
None  
6.9  Information Communications/Technology/Digital 
None  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no direct implications arising from this report. Any changes to policy through the
review of the Local Development will be subject to assessment. 
6.11  Climate Change and Biodiversity Impacts 
Town centres are often the most accessible by public and active travel options.
Successful and thriving town centres that provide a range of services and social
opportunities can help to reduce the need to travel by car and support walkable
neighbourhoods. Making best use of existing town centre infrastructure including reuse
and regeneration of existing buildings is preferable to demolition from an embodied
carbon perspective. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Growth, Planning and Climate (Chief Planning Officer), , Service
Manager Legal Services, L Rowan Committee Services Officer, and the Chief Financial
Page 155

Page 156

Officer and any comments made have been incorporated into the report   
8.  BACKGROUND PAPERS  
8.1     
Page 156

Page 157

Moray Town Centre
TOWN CENTREHEALTHCHECK
Health Check Assessment 
2025
© Crown copyright [and database rights] 2025 OS AC0000806936 Moray Council
Page 157

Page 158

1 
1. Executive Summary
In 2025, Moray Council undertook several Town Centre Health Check Assessments in the
town centres of Elgin, Forres, Buckie, Keith and Lossiemouth. Limited assessment of
Dufftown, Rothes, Aberlour and Fochabers was also undertaken.
This report does not aim to interpret the data collected; it is simply presenting information
for others to analyse. 
1.1 Summary Table of Key Findings
A summary table of key findings is set out below: 
Town
Comparison Convenience Retail Service Leisure
Service Vacancy Vacancy Rate
2025 2023 2025 2023 2025 2023 2025 2023 2025 2023 2025 2023
Elgin 66 73 17 18 43 46 70 70 50 40 20% 16%
Edgar Road 22 20 3 3 7 4 4 3 4 5 10% 14.3%
Forres 33 31 12 15 25 24 24 23 7 18 7% 16.2%
Keith 26 27 12 12 17 18 18 18 10 7 12% 7%
Buckie 25 24 9 7 20 17 18 20 7 11 8.9% 13.7%
Lossiemouth 10 11 6 8 14 11 18 21 5 5 9.4% 9%
Aberlour 4 5 5 4 6 5 9 13 1 0 4% 0%
Dufftown 7 10 2 3 8 8 14 17 10 5 24.3% 11.6%
Fochabers 6 8 3 4 5 2 10 9 1 3 3% 11.5%
Rothes 2 3 3 3 4 3 9 9 7 5 28% 22%
Page 158

Page 159

2 
1.2 Vitality & Viability Indicators
Vitality and viability indicators are used to assess the performance of town centres featured
in this report.
‘Vitality’ is a measure of how lively and busy a town centre is. ‘Viability’ is a measure of the
capacity to attract ongoing investment for maintenance, improvement, and adaptation to
changing needs. Together these measures give an indication of the health of a town centre
and, when used consistently over a period of time they can demonstrate changes in
performance. 
A brief description of key Vitality and Viability Indicators assessed in this report are provided
below:
• Diversity of uses surveys analyse the mix of uses within each centre and the
quantum floor space they occupy. A table showing GOAD categories is included in
Appendix II.
• Retailer representation involves recording the identity and type of retailers within
the town centre. This form of analysis focuses on the number of independent and
national retailers within a centre.
• Vacancy rates can be defined as either the number of units or amount of vacant
floor space not in occupation, expressed as a percentage of the total number of retail
units or floor space in a centre. Vacancies are measured for vacant Comparison,
Convenience, Retail Services and Leisure Services only. A vacancy rate below 10%
indicates a healthy and viable town centre 
• Pedestrian flow – it was not possible to assess pedestrian flow in 2025, new
automatic counters are due to be installed. 
1.3 Previous Assessments
Figures for 2021 were obtained by Hargest Planning Ltd. as part of the wider Moray Retail
Study 2021. Whilst a similar methodology was used, data was presented differently which
accounts for differences between datasets.
Additionally, there have been some changes to the categorisation of certain uses to improve
consistency between towns. These adjustments, as the study progresses account for some
of the differences between categories.  
1.4 GOAD Designations
GOAD designations are used to categorise the type of retailer/organisation within an
occupied unit. Definitions of the key designations feature below: 
• Convenience units are predominantly food-related, some examples of this
designation are supermarkets, butchers, bakers, off licenses, and newsagents.
Page 159

Page 160

3 
• Comparison retailers sell a wide range of non-food items including clothing, books,
office supplies, toys, furniture and flowers. This designation also includes chemists
and charity shops.
• Leisure Services provide opportunities for socialising and relaxation such as bars,
cinemas, night clubs, takeaways/restaurants, hotels and sports facilities.
• Retail Services provide an in-person service. This designation covers
hairdressers/barbers, health & beauty treatment, post offices, travel agents and dry
cleaners. 
Other designations include financial & business services, health & medical services, public
service, religious service and offices. 
The number of vacancies only considers vacant convenience, comparison, leisure service
and retail service units; this is VAC1. All other designations are classed as VAC2 and are not
included in the vacancy figures through this assessment. 
2. Elgin Town Centre Health Check
Since the last town centre health check was undertaken in 2023, Elgin has seen significant
changes. The most notable of these being the closure of the entire St Giles shopping centre,
accounting for over half of Elgin’s current vacant units. The closure has resulted in Ashers
Bakery and Ramsdens occupying new premises within the town centre. The Moray School
Clothing Bank has also occupied a unit on the High Street. However, several national retailers
including Argos, Waterstones, Subway, The Works, Vodaphone and, O2 have not returned to
Elgin since St Giles closed in January 2025. 
Leisure services within Elgin town centre have also experienced changes. Restaurants
including The Northern Chip Shop, The Pancake Place and, 156 Bar and Grill have all closed.
However, several new eateries like Norah’s Café and Wine Bar which occupies the unit
vacated by Starbucks, You You Tea and Krua Thai Restaurant have opened in recent years. 
The South Street regeneration plan is now underway bringing new residential, leisure and
employment use to the town centre. Additionally, Poundland has moved from its temporary
unit back to its original location on the high street after over 6 years of restoration.
The number of vacant units within Elgin town centre is the highest since the biennial Town
Centre Health Checks commenced in 2010.
2.1 Diversity of Uses
The dominant use within Elgin is now leisure services, this has changed from comparison
retailing which has been the most common use for almost 10 years. Comparison retail still
makes up a significant number of units, but the number of units has been steadily declining.
Retail services within Elgin town centre are predominantly comprised of
hairdressers/barbers. There is a smaller proportion of convenience shops but some units
within this designation, like Tesco have large floor spaces. Almost 30 units are designated as
Financial and Business Services, these include solicitors, accountants, and property agents.
Page 160

Page 161

4 
The overall mix of uses and the quantum floor space they occupy is summarised below: 
Summary of Elgin Diversity of Uses Survey 
2025 2023 2021
(Completed by Hargest
Planning Ltd)
Type of Use No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. Of
Outlets
Floor space
(sqm)
Comparison 66 16337.4 73 18847.4 82 28338
Convenience 17 14909.9 18 15440.1 16 10293
Retail
Service
43 3530.3 46 4503.4 55 17460
Leisure
Service
70 15891.9 70 17392.9 61
Financial &
Business
Service
26 5710.2 38 7760.4 26
Health &
Medical
9 9   
Public
Service
21  26   
Religious
Service
6 6   
General
Office Use
17  24   
Vacancy 50 10664.5 40 8986.6 32 6546
Total 325 67044.2 350 72930.8 272 62637 
2.2 Retailer Representation 
Elgin town centre is home to a number of national retailers including TK Maxx, Marks and
Spencer, Boots, Costa Coffee, Starbucks, Tesco and Aldi. The total number of national
(Scottish/UK) retailers within Elgin is 40. This is a decrease from 46 in 2023, this can be
attributed to the closure of the St Giles centre in which many national retailers had units.
Elgin town centre has a good range of independent stores. Batchen Street, Commerce Street
and South Street are hubs for independent retail within the town centre. These shops tend
Page 161

Page 162

5 
to offer a more specific, bespoke service. Elgin also has several independent retail and
leisure service providers, these include restaurants, hairdressers, beauticians and,
takeaways.
Within the defined town centre boundary there are a number of food stores, the largest of
which are Tesco on Blackfriars Road, Marks & Spencer’s store on High Street and an Aldi
store. Both Tesco and M&S have a substantial portion of floor space for Comparison goods as
well as Convenience. This has all been classed as ‘Convenience’ floor space above.
There are seven charity shops within the town centre boundary, this is the same level as
2023 and 2018.
There are 20 hairdressers or barbers within Elgin town centre, these occupy almost half of all
retail service outlets.
Elgin town centre has 2 betting offices and Ramsdens is the only retailer resembling a high
interest money lender.
There are 15 takeaways within the town centre, this is a slight decrease from 16 in 2023. This
figure does not include restaurants or cafes which offer a takeaway service in addition to the
“sit in” offer.
2.3 Vacancy Rate
A site survey by Moray Council planning staff during summer 2025 confirmed the number of
vacant units within Elgin town centre stood at 50. This is an increase from 2023 when 40
vacant units were recorded. Vacancies account for 20% of the total number of Comparison,
Convenience, Retail and Leisure Service units within the centre. 
The St Giles Centre accounts for 26 of the vacant units within Elgin and its closure has seen
11 retailers not return to the town centre. It is noted that previous town centre health
checks in 2018 and 2023 highlighted high vacancy rates within the St Giles Centre. Other
vacancies since 2023 include TUI travel agent, Shopmobility Moray, Sirology and Lloyds
Pharmacy. A number of units have remained vacant since the last assessment including 239,
134, 35 and 7 High Street.
Available floor space data indicates that approximately 10,664.5² of floor space within Elgin
town centre is vacant, this is an increase from the 8,986.6m² recorded in 2023. There is
approximately 100.2m of vacant retail frontage within the town centre. This equates to 7.7%
of the retail frontage of the traditional shopping streets within Elgin town centre, these
include the core retail area of High Street, Commerce Street, Batchen Street, South Street
and Thunderton Place. 
Page 162

Page 163

6 
3. Edgar Road Health Check 
Edgar Road is not included within Elgin’s town centre boundary; however, it is a key
commercial centre with substantial retail space. Edgar Road encompasses Springfield Retail
Park, Elgin Retail Park, and shops along Edgar Road. Since 2023, there has been limited
change. Carpet Right and the NHS Covid Vaccine Centre have closed, and Bensons for Beds is
now a charity shop.
3.1 Diversity of Uses
The dominant use within Edgar Road is Comparison retailing. These are predominantly
national retailers such as Home Bargains, B&M, Pets at Home and Boots. Convenience
retailing accounts for a small number of units but a large proportion of floor space use; ASDA
Superstore, The Food Warehouse and, Allaburn Farm Shop have significant floor space. Retail
services are predominantly comprised of car related services.
The overall mix of uses and the quantum floor space they occupy is summarised below: 
Summary of Edgar Road Diversity of Uses Survey 
2025 2023 2018
Type of Use No. of
Outlets
Floor
space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 22 21536.16 20 21699.8 21 21171.76
Convenience 3 13325.86 3 13325.86 2 12386.8
Retail Service 7 1508.3 4 1481.3 2 547.2
Leisure Service 4 1352.63 3 665.7 4 1182.06
Financial &
Business
Service
3 1232.5 3 1232.5 3 1232.5
Health &
Medical
1  2  1 
Public Service 1  1  1 
Religious
Service
0    0 
General Office
Use
0    0 
Vacancy 4 2526.9 5 3050.21 7 4247.44
Total 45 41482.35 42 41455 41 40767.76
Page 163

Page 164

7 
3.2 Retailer Representation
There are 22 national (Scottish/UK) retailers along Edgar Road, these take up the majority of
units along Edgar Road. Some local independent retailers have units outside of the main
retail parks like Elgin Autos, Wards Veterinary, Elgin Marble Company, Hawco Car Sales and
Allaburn Farm Shop.
3.3 Vacancy Rate
The number of vacant units identified was 4, an decrease of 1 from 2023. Floorspace figures
indicate the amount of vacant floorspace was approx 2,526.9m². All vacant units are located
within Elgin Retail Park. 
4. Forres Town Centre Health Check 
Forres has seen a significant positive shift since the last health check in 2023, with the
number of vacant units down from 18 in 2023 to 7 in 2025. Independent retailers like The
Old Market Gift Shop and MacKenzie of Forres Kilt Shop have occupied previously vacant
units. Additionally, 2 vacant banks, which had been empty for a number of years, at the
centre of Forres High Street have been converted into a whiskey shop and banking hub.
4.1 Diversity of Uses
Comparison retailing remains as the dominant use within Forres Town Centre. Leisure and
Retail services also make up a significant proportion of retailers. Forres has a decent number
of convenience retailers, comprised of convenience stores, butchers, and specialist food
shops. Larger convenience retailers such as Tesco and Lidl exist just out of the town centre.
The overall mix of uses and the quantum of floor space they occupy is summarised in the
table below.
Summary of Forres Diversity of Uses Survey 
2025 2023 2021
(Completed by Hargest
Planning Ltd)
Type of Use No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 33 5918.9 31 5067.9 29 4455
Convenience 12 1955.9 15 1933 11 1840
Retail
Service 
25 2454.61 24 1683 18 4591
Page 164

Page 165

8 
Leisure
Service
24 1525.3 23 1232.6 21
Financial &
Business
Service
11 3747.9 9 3410.7 8
Health &
Medical
4  4  5 
Public
Service
9  10  14 
Religious
Service
3  3  3 
General
Office Use
3  4  6 
Vacancy 7 906.4 18 1758.1 12 1084
Total 131 16509.01 141 150853 138 16091.4   
4.2 Retailer Representation
14 national (Scottish/UK) retailers occupy units within Forres town centre including, Boots,
The Co-op and Savers. This is the same level as the previous health check in 2023. 
5 charity shops were identified within the town centre, this is the same level as the previous
health check.
No betting offices or high interest money lending were identified during the assessment. 
There are 7 takeaways within Forres town centre, this is consistent with the previous health
check. This figure does not include restaurants or cafes which offer a takeaway service in
addition to the “sit in” offer.
4.3 Vacancy Rates
7 vacant units were identified within Forres town centre, this is a decrease of over 60% from
2023. The majority of units along Forres High Street that were vacant in 2023 are now
occupied, the only exceptions are 154, 85 and 97C. Vacancies along Forres High Street are
relatively spread out, this helps to reduce the visual impact of vacant units within the town
centre.
Floor space data suggests approximately 906.4m² of floor space is currently vacant. This is a
significant reduction from the 1,758.1m² recorded in 2023. There is approximately 9.1m of
vacant frontage in Forres town centre, this accounts of 1.2% of the 748m total frontage. 
Page 165

Page 166

9 
5. Keith Town Centre Health Check
Keith and Fife Keith have their own individual town centres, for the purpose of this report
the findings have been combined. Keith has seen some new businesses within its town
centre including Reform by Ryan Fitness and Tyred and Cranky Bike Shop. Since the last
health check in 2023, new vacant units have emerged in Keith, predominantly along Mid
Street.
5.1 Diversity of Uses
Comparison retailing is the most common use within Keith, followed by leisure and retail
services.
The overall mix of uses and the quantum of floor space they occupy is summarised in the
table below.
Summary of Keith Diversity of Uses Survey 
2025 2023 2021
(Completed by Hargest
Planning Ltd)
Type of Use No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 26 5060.9 27 5373.7 23 4051
Convenience 12 1400.7 12 1393.5 11 1497
Retail Service 17 1447.9 18 1305.9 14 3951 
Leisure
Service
18 1282.2 18 1028.8 15
Financial &
Business
Service
9 925 9 1220 8
Health &
Medical
1  1   
Public Service 1     
Religious
Service
1  1   
General Office
Use
2  3   
Vacancy 10 880.5 7 706 12 1925
Total 97 10997.2 96 11027.9 83 11424
Page 166

Page 167

10 
5.2 Retailer Representation 
There are 6 national (Scottish/UK) retailers within Keith town centre including, Spar and
Harry Gows Bakery. 
The closure of Blythswood Care at 100-102 Mid Street has reduced the number of charity
shops in Keith to 1.
No betting offices or high interest money lenders were identified during the assessment.
6 takeaways were identified within the town centre; this has increased from 5 in 2023. This
figure does not include restaurants or cafes which offer a takeaway service in addition to the
“sit in” offer.
5.3 Vacancy Rate
10 vacant units were identified in Keith, this is an increase from 7 in the last health check. 
The Barbers at 169 Mid Street and relocation of Kelpie Games from 109 to 119 Mid Street
has resulted in new vacancies. The former Keystore at 78-82 Mid Street and The Cozy Neuk
at 105 Mid Street are both still vacant from 2023.
Floor space data indicates approximately 931.5m² of floor space is vacant within Keith’s town
centre. This is an increase of 225.5m². There is approximately 71.4m of vacant retail frontage
along Mid Street, the traditional shopping street in Keith. 
6. Buckie Town Centre Health Check
Buckie town centre has seen some changes since the last health check in 2023. A handful of
new independent businesses, predominantly retail services like Glow 365 Tanning, USA Nails
and Spa, and Sign/Etch have open along East Church Street. The town centre has also seen a
number of new retail and non-retail vacancies including WM. R Mair Funeral Directors,
Bengal Brasserie Indian Restaurant and Hardware and Tech Centre. 
6.1 Diversity of Uses
Within Buckie, comparison retail is the most common use. The number of retail services has
increased from 17 in 2023 to 20 in 2025, over half of retail service units are occupied by a
hair or beauty service. Buckie town centre has an adequate selection of convenience
retailers, with corner shops, bakeries and a Lidl supermarket. 
The overall mix of uses and the quantum of floor space they occupy is summarised in the
table below. 
Page 167

Page 168

11 
Summary of Buckie Diversity of Uses Survey 
2025 2023 2021
(Completed by Hargest
Planning Ltd)
Type of Use No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 25 5234.8 24 4413 27 6161
Convenience 9 2352.2 7 2243.9 12 3413
Retail
Service
20 1508.3 17 1584.1 11 4693
Leisure
Service
18 2248 20 2437.9 23
Financial &
Business
Service
6 1056 8 1391.9 7
Health &
Medical
3  5   
Public
Service
6  9   
Religious
Service
4  4   
General
Office Use
1     
Vacancy 7 755.8 11 1928 6 724
Total 99 13155.1 105 13871.8 86 14991 
6.2 Retailer Representation 
Buckie has 13 national retailers (Scottish/UK) within its town centre including The Co-op,
Savers, Subway and Lidl. This is an increase of 2 from 2023. Buckie has a large number of
independent shops and retail service units. 
3 charity shops were identified with the town centre, this has remained consistent since the
last health check.
1 betting office and no high interest money lending units were identified in the assessment.
There are 6 takeaways within Buckie’s town centre, this has decreased from 7 following the
closure of Sugar and Slice at 7 West Church Street. This figure does not include restaurants
or cafes which offer a takeaway service in addition to the “sit in” offer.
Page 168

Page 169

12 
6.3 Vacancy rate
7 vacant units were identified within Buckie town centre, this is a decrease from 11 in 2023. 
Floor space data indicates approximately 755.8m² of floor space within Buckie is vacant. This
significant decrease from 1928m² in 2023 can be attributed to 5 East Church Street, which is
now occupied by Taylors Home Furnishings. This unit has just over 1000m² of floor space
spread over three floors. 
Approximately 57.7m of retail frontage is vacant, this equates to 6% of total retail frontage
along the traditional shopping streets (East Church Street, West Church Street and High
Street) within Buckie town centre. 
7. Lossiemouth Town Centre Health Check
Lossiemouth does not have a defined ‘town centre’ within the Moray Local Development
Plan 2020. A map of the study area for this assessment has been included below. 
Lossiemouth has experienced some changes since the last town centre health check in 2023.
Moray Driftwood Designs now occupies 33 King Street and The Pier coffee shop has taken
over an old Ladbrokes unit beside the harbour. Moray Coastal Flooring has moved to a larger
premises at the former Bank of Scotland unit along Queen Street. The closure of Buckley’s
Newsagents and Fred’s Threads have resulted in new vacancies.
Page 169

Page 170

13 
7.1 Diversity of Uses
The most common use within Lossiemouth is leisure services, likely to be attributed to the
area’s popularity with tourists. Lossiemouth also has a decent number of retail services and
comparison units. The diversity of convenience retailers is limited within the town centre,
The Co-op is the only supermarket for residents and tourists. 
The overall mix of uses and the quantum of floor space they occupy is summarised in the
table below. 
Summary of Lossiemouth Diversity of Uses Survey 
2025 2023 2021
(Completed by Hargest
Planning Ltd)
Type of Use No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 10 1064.4 11 907.9 11 882
Convenience 6 1742.6 8 1841.3 8 989
Retail
Service
14 979.5 11 775.4 12 3404 
Leisure
Service
18 1680.8 21 2531.7 21
Financial &
Business
Service
3 665.2 3 611.7 2
Health &
Medical
3  2   
Public
Service
5  3   
Religious
Service
1  1   
General
Office Use  
1   
Vacancy 5 592.3 5 600.5 1 81
Total 65 6724.8 61 7154.3 55 5356 
Page 170

Page 171

14 
7.2 Retailer Representation 
There are only 2 national goods/services retailers (Scottish/UK), these are The Co-op and
Right Medicine Pharmacy. Lossiemouth has a diverse range of independent retailers that
offer a more unique experience when compared to high street chains.
No charity shops, betting shops, or high interest lenders were identified during the
assessment.
There are 6 takeaways in Lossiemouth, this is down from 7 in 2023. This figure does not
include restaurants or cafes that offer a takeaway service in addition to ‘sit in’ offer.
7.3 Vacancy Rate
The number of vacant units identified in Lossiemouth is 5, this is consistent with the 2023
assessment. There is approximately 592.3m² of vacant floor space in Lossiemouth, a slight
decrease from 2023. 
8. Smaller Settlement Health Check
Health check assessments were carried out for Aberlour, Dufftown, Fochabers and Rothes. 
Leisure service is the predominant use across all smaller settlements in Moray. Aberlour and
Dufftown are popular with tourists and have a high percentage of leisure usage. Smaller
settlements also tend to have a significant proportion of retail services. Comparison retailing
tends to be provided by independent retailers offering specific products. Convenience retail
is provided by one or two convenience shops like Co-op stores in Aberlour, Dufftown and
Fochabers; Rothes is serviced by a Keystore and Morrisons.
8.1 Aberlour
Aberlour has experienced minimal change since the 2023 health check. 79 High Street is now
home to 3 Bags Wool Craft Shop and most notably, the petrol station and wooden toy shop
along the High Street has closed. Aberlour is heavily reliant on independent retailers, the Co-
Operative is the only national retailer in the town. 
Page 171

Page 172

15 
Summary of Aberlour Diversity of Uses Survey 
2025 2023 2018
Type of Use No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 4 311.5 5 327 7 613
Convenience 5 814.9 4 666.7 4 666.7
Retail
Service
6 1804.1 5 1719.9 5 1665.2
Leisure
Service
9 551.7 13 806.3 10 572.9
Financial &
Business
Service
3 484.7 3 286.1 2 191.1
Health &
Medical
2  2  2 
Public
Service
3  4  4 
Religious
Service
1  1  1 
General
Office Use    
0 
Vacancy 1 15.5 0  1 70.1
Total 34 3982.4 37 3806 36 3779 
Page 172

Page 173

16 
8.2 Dufftown
Vacancy rates in Dufftown have doubled since 2023. A number of local businesses including
The Chippy Café, Fourmet Guesthouse, McIntosh Butchers and, the Fireplace Shop have
closed in recent years. The Chippy Café and Fourmet Guesthouse are comprised of multiple
units and occupied a large floorspace that is now vacant. Two new businesses have occupied
previously vacant units along Fife Street; The Salon and The Cozy Coo Café. 
Summary of Dufftown Diversity of Uses Survey 
2025 2023 2018
Type of Use No. of
Outlets
Floor
space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 7 380.4 10 399.3 7 291.8
Convenience 2 528.9 3 607.5 7 825.7
Retail
Service
8 691.2 8 603.5 4 599.2
Leisure
Service
14 869.9 17 1174 19 1403.5
Financial &
Business
Service
3 797.7 4 912.2 4 881.5
Health &
Medical      
Public
Service
2  3  3 
Religious
Service      
General
Office Use  
1  
Vacancy 10 805.7 5 346.1 2 93.8
Total 46 4073.8 51 4042.6 46 4095.5 
Page 173

Page 174

17 
8.3 Fochabers
Fochabers has experienced a positive change since the last health check in 2023, with only
one vacant unit and four previous vacancies now filled. Mother Goose Catering and Speyside
Angling Centre have taken over vacant units along Fochabers High Street. 
Summary of Fochabers Diversity of Uses Survey 
2025 2023 2018
Type of Use No. of
Outlets
Floor
space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. of
Outlets
Floor space
(sqm)
Comparison 6 646.6 8 737.1  9 810.5
Convenience 3 600.9 4 663.7 4 287.5
Retail Service 5 262.3 2 76.5  2 78.5
Leisure
Service
10 404.5 9 341.7  9 439.5
Financial &
Business
Service
1 343.6 1  1 197.8
Health &
Medical
1  1  2 
Public
Service
3  2  2 
Religious
Service
1  1  1 
General
Office Use
1  2  2 
Vacancy 1 74.8 3 212 1 343.6
Total 32 2332.7 33 2031 33 2157.4 
Page 174

Page 175

18 
8.4 Rothes
Rothes currently has 7 vacancies. No vacant units have been occupied recently within Rothes
town centre. Rothes also has a high number of financial and building service usage including
Forsyths and Hendersons. Rothes Primary School, Fire Station and Police Station are all
located within its town centre, this accounts for the high number of public service units for a
town of this size. 
Summary of Rothes Diversity of Uses Survey 
2025 2023 2018
Type of Use No. of
Outlets
Floor
space
(sqm)
No. of
Outlets
Floor space
(sqm)
No. Of
Outlets
Floor space
(sqm)
Comparison 2 251.5 3 337  6 276
Convenience 3 424.6 3 474.9 3 474.9
Retail Service 4 493.3 3 403.6 2 362.5
Leisure
Service
9 104.8 9 104.8  9 153
Financial &
Business
Service
6 838.1 4 838.1 4 203.6
Health &
Medical
1  1  1 
Public
Service
5  6  6 
Religious
Service
1  1  1 
General
Office Use      
Vacancy 7 709.8 5 433.8 3 275.6
Total 38 2822.1 35 2592.2 35 1745.6 
Page 175

Page 176

19 
Appendix I: Location of Key Centres 
Page 176

Page 177

20 
GOAD Class GOAD Sub-Class Primary Activity Code
Retail Comparison Antiques shops COM 1
Retail Comparison Art & Art dealers COM 2
Retail Comparison Booksellers COM 3
Retail Comparison Carpets and Flooring COM 4
Retail Comparison Charity Shops COM 5
Retail Comparison Chemists & Drugstores COM 6
Retail Comparison Children’s & Infants wear COM 7
Retail Comparison Crafts, Gifts, China & Glass COM 8
Retail Comparison Cycles & Accessories COM 9
Retail Comparison Department and Variety Stores COM 10 
Retail Comparison DIY & Home Improvement COM 11
Retail Comparison Electrical & Other Durable Goods COM 12
Retail Comparison Florists COM 13
Retail Comparison Footwear COM 14
Retail Comparison Furniture COM 15
Retail Comparison Gardens & Equipment COM 16
Retail Comparison Greeting Cards COM 17
Retail Comparison Hardware & Household Goods COM 18
Retail Comparison Jewellery, Watches & Silver COM 19
Retail Comparison Mixed Clothing COM 20
Retail Comparison Ladies Wear & Accessories COM 21
Retail Comparison Leather & Travel Goods COM 22
Retail Comparison Men's Wear & Accessories COM 23
Retail Comparison Music & Musical Instruments COM 24
Retail Comparison Stationers COM 25
Retail Comparison Office Supplies COM 26
Retail Comparison Other Comparison Goods COM 27
Retail Comparison Photographic COM 28
Retail Comparison Second Hand Goods & Books COM 29
Retail Comparison Sports, Camping & Leisure Goods COM 30
Retail Comparison Telephones & Accessories COM 31
Retail Comparison Textiles & Soft Furnishings COM 32
Retail Comparison Toys, Games & Hobbies COM 33
Retail Comparison Vehicle & Motorcycle Sales COM 34
Retail Comparison Vehicle Accessories COM 35
Retail Comparison Opticians COM 36
Retail Convenience Bakers & Confectioners CNV  1
Retail Convenience Butchers CNV 2 
Appendix II:  GOAD Categories and Classifications
Page 177

Page 178

21 
GOAD Class GOAD Sub-Class Primary Activity Code
Retail Convenience Convenience Store, Groceries & Frozen
Food
CNV 3
Retail Convenience Delicatessen CNV 4
Retail Convenience Fishmonger CNV 5
Retail Convenience Health Foods CNV 6
Retail Convenience Markets CNV 7
Retail Convenience Off licence CNV 8 
Retail Convenience Shoe repairs etc CNV 9 
Retail Convenience Supermarkets CNV 10
Retail Convenience Confectionery, Tobacconist, Newsagent CNV 11
Retail Retail Service Clothing & Fancy-Dress Hire RS 1
Retail Retail Service Dry Cleaner & Laundrette RS 2
Retail Retail Service Filling Stations & Garages RS 3
Retail Retail Service Health & Beauty (e.g. beauticians, nail bars) RS 4
Retail Retail Service Hairdressers/Barbers RS 5
Retail Retail Service Other Retail Outlets RS 7
Retail Retail Service Photo Processing RS 8
Retail Retail Service Photo Studio RS 9
Retail Retail Service Post Offices RS 10
Retail Retail Service Repair, Alterations & Restoration RS 11
Retail Retail Service Travel Agents RS 12 
Retail Retail Service Vehicle Rental RS 13
Retail Retail Service Vehicle Repair & Services RS 14
Retail Other Retail Shops OR 1
Service Leisure Services Bars, Wine Bars & Public House LS 1
Service Leisure Services Bingo & Amusement LS 2
Service Leisure Services Cafes  LS 3
Service Leisure Services Casino & Betting Offices LS 4
Service Leisure Services Cinemas, Theatres & Concert Halls LS 5
Service Leisure Services Clubs LS 6
Service Leisure Services Disco, Dance & Nightclub LS 7
Service Leisure Services Fast Food & Takeaways LS 8
Service Leisure Services Hotels & Guest Houses LS 9
Service Leisure Services Restaurants LS 10
Service Leisure Services Sports & Leisure Facilities LS 11
Service Financial & Business
Services 
Building Society FBS 1
Service Financial & Business  Building Supplies & Services FBS 2
Service Financial & Business
Services 
Business Goods & Services FBS 3
Page 178

Page 179

22 
GOAD Class GOAD Sub-Class Primary Activity Code
Service Financial & Business
Services 
Employment & Careers FBS 4
Service Financial & Business
Services 
Financial Services FBS 5
Service Financial & Business
Services 
Legal Services FBS 6
Service Financial & Business
Services 
Other Business Services FBS 7
Service Financial & Business
Services 
Printing & Copying FBS 8
Service Financial & Business
Services 
Property Services FBS 9
Service Financial & Business
Services 
Retail Banks FBS 10
Service Health & Medical
Services
Chiropodist HMS 1
Service Health & Medical
Services
Dental Surgery HMS 2
Service Health & Medical
Services
Doctors Surgery HMS 3
Service Health & Medical
Services
Health Centre HMS 4
Service Health & Medical
Services
Nursing Home HMS 5
Service Health & Medical
Services
Osteopath HMS 6
Service Health & Medical
Services
Other Health & Medical Service HMS 7
Service Health & Medical
Services
Rest home HMS 8
Service Health & Medical
Services
Veterinary surgery HMS 9
Service Public Service Advice Centre PS 1
Service Public Service Community Centre PS 2
Service Public Service Council Offices PS 3
Service Public Service Educational Establishment PS 4
Service Public Service Emergency Services PS 5
Service Public Service Information Centre PS 6
Service Public Service Kindergarten PS 7
Service Public Service Library PS 8
Service Public Service Museum & Art Gallery PS 9
Service Public Service TA/Cadet Centre PS 10
Service Public Service Tourist Information PS 11
Service Religious Service Place of Worship REL 
Vacant Vacant Retail Vacant Shop VAC 1
Page 179

Page 180

© The Moray Council 2025
© Crown copyright [and database rights] 2025 OS AC0000806936 Moray CouncilPage 180

Page 181

Report to: Planning and Regulatory
Services Committee 
Meeting
Date:
16 December 2025  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Darren Westmacott Contact
Email:
Darren.Westmacott@moray.gov.uk 
Subject: Housing Land Audit 2025/26 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider the housing land supply situation in Moray and
agree the final version of the Moray Housing Land Audit (HLA) 2025/26.  
1.2  This report is submitted to Committee in terms of Section III (E) (2) of the Council’s
Scheme of Administration relating to the review and preparation of Local Development
Plans (LDP).  
2.  SUMMARY  
2.1  The report provides the Committee with an update on the current housing land supply in
Moray as at 31 March 2025, summarises responses to the consultation and seeks
approval of the Moray HLA 2025/26  
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  note the housing land supply in Moray;   
ii)  agree the Council’s responses to the consultation on the draft Moray Housing
Land Audit 2025/26, as set out in Appendix 1 of the report; and   
iii)  approve the finalised Moray Housing Land Audit 2025/26, as set out in
Appendix 2 of the report.   
Darren Westmacott
Planning Officer (Strategic Planning and Development) 
4.  BACKGROUND AND CONTEXT  
Item 9.
Page 181

Page 182

4.1  National Planning Framework 4 (NPF4) was published in February 2023 and introduced
significant changes to the development planning system across Scotland. NPF4 Policy 16:
Quality Homes sets out that a local development plan (LDP) should identify a housing
target for the area it covers, in the form of a Local Housing Land Requirement (LHLR). The
LHLR represents how much land is required and is expected to exceed the 10-year
Minimum All-Tenure Housing Land Requirement (MATHLR). NPF4 sets the MATHLR as
3,450 units for Moray.  
4.2  The Housing Land Audit (HLA), as set out in Appendix 2, provides an overview of Moray’s
housing land supply as at 31 March 2025. It is used to monitor and support housing
delivery and provides a comparison of supply with the LHLR of 5,732 units.  
4.3  The HLA identifies and provides a programme of expected housing delivery over an initial
10-year period and the years thereafter. The audit also examines past and future predicted
trends in housing land supply and identifies any action required to address issues arising. 
4.4  Guidance on HLAs was issued by the Scottish Government on 20 January 2025 to support
a consistent approach to the method and presentation of HLA. The HLA 2024/25
implemented a number of these changes based on the Scottish Government HLA
Feedback Paper from August 2023. Moray Council moved to a financial year audit in 2024,
therefore completions for 2023/24 also include calendar months January to March 2023
(identified in the audit by an asterisk). The key change made this year has been
modifications to the definitions for the land supply (now referred to as site capacity)
categories.  
4.5  The audit includes three categories of site capacity (land supply): 
• Deliverable - Sites which are free from constraints and can be realistically
programmed in the short/medium/long term. These sites contribute towards
meeting the LHLR.
• Deliverable with Constraints - Sites with one or more constraints that may be
considered deliverable if action to overcome the constraint can be identified or if
they are constrained only by a lack of market demand. These sites contribute
towards meeting the LHLR.
• Constrained - Sites with constraints which, at the base date of the audit, have no
known prospect of being resolved. These sites do not contribute towards meeting
the LHLR.  
4.6  Deliverability factors (constraints) that could constrain the deliverability of the site
include: 
• Land use status.
• Ownership (includes programming/LONGs).
• Physical conditions (e.g. slope, aspect, flood risk, contamination and pipelines).
• Infrastructure (as defined under ‘Infrastructure first’ in NPF4).
• Financial (e.g. construction costs, deficit funding and marketability).  
4.7  Housebuilders and landowners were consulted during the preparation of the draft audit to
provide the most up to date build-out projections. The figures within the draft audit are
based upon housebuilders’ returns, where received, with adjustments made by Planning
Officers. 
Page 182

Page 183

5.  HOUSING LAND AUDIT 2025/26  
5.1  The draft HLA 2025/26 was made available for consultation on the Council’s website and
notification was sent to Homes for Scotland (HfS), Cairngorms National Park Authority
(CNPA), statutory consultees as well as developers, agents and landowners. Comments
were received from Altyre Estate, CNPA, HfS, Scottish and Southern Electricity Networks
(SSEN), Scottish Water and Tulloch of Cummingston which are summarised, with the
proposed Council responses, in Appendix 1 of the report.  
5.2  The final HLA is included as Appendix 2 and identifies that there is a 24.4-year total
housing site capacity (12,209 units), made up of ‘Deliverable’ and ‘Deliverable with
Constraints’ site capacities, based on an annual total deliverable site capacity target of
500 units as identified in the Housing Needs and Demand Assessment (HNDA) 2023. This
consists of an 11.7-year total deliverable site capacity (5,844 units) and 12.7-year
constrained site capacity (6,365 units), of which 7.7-years capacity is designated as LONG
(3,825 units).  
5.3  This approach to LONG term housing land has been recognised as good practice and
allows for longer term infrastructure planning through strategic level masterplanned
expansion areas. This also means that the MLDP 2027 will likely only require minimum
additional housing land to be identified, with officers exploring policy approaches to
incentivise brownfield site redevelopment.  
5.4  Actual housing completions in 2024/25 were 305 units compared to the programmed 358
units, a difference of 14.8%, primarily due to projected completions in Buckie not
materialising, with one of the housebuilders having liquidated. This is compared to 459 in
2023/24*, which was a drop of 1.08% compared to the programmed rate.  
5.5  While the overall total site capacity of housing is particularly good, the projected house
completions reflect the low supply of new housing in Keith and Speyside. However, work at
Banff Road (Keith R4) is progressing and construction has recently begun at Speyview
(Aberlour R2). In addition, a masterplan is being finalised for Hillside Farm (Dufftown R1) in
partnership with Dufftown and District Community Association. The Moray Growth Deal
Housing Mix Delivery project will bring further investment to help unlock previously
constrained housing sites.  
6.  BROWNFIELD SITES  
6.1  NPF4 Policy 9 ‘Brownfield, vacant and derelict land and empty buildings’ aims to
encourage, promote and facilitate the reuse of brownfield, vacant and derelict land and
empty buildings and to help reduce the need for greenfield development.  
6.2  Completions on brownfield sites in 2024/25 was 4 units, compared with 18 units in
2023/24*, 55 in 2021 and 15 in 2020. This equates to 5.6% of total completions between
2020 and 2024/25.  
6.3  As set out in the MLDP 2027 Evidence Report, Moray Council have proposed a target of
10% of housing completions on brownfield sites by the end of the plan period. Whilst the
target is considered to be ambitious, it is recognised that this will be dependent upon
availability of staff and financial resources to tackle the complexity of brownfield site
redevelopment.  
Page 183

Page 184

7.  SUMMARY OF IMPLICATIONS  
7.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
7.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
7.3  Policy and Legal 
The proposals support the delivery of the statutory MLDP 2020 and NPF4.  
7.4  Financial 
None arising from this report. 
7.5  Risk 
None arising from this report.  
7.6  Staffing 
None arising from this report. Preparation of an annual HLA is part of the workload of the
Strategic Planning and Development section.  
7.7  Best Value and Transformation
Page 184

Page 185

None arising from this report.  
7.8  Property 
None arising from this report.  
7.9  Information Communications/Technology/Digital 
None arising from this report.  
7.10  Equalities, Social Inclusion and Economic Impact 
None arising from this report. Positive impact in terms of equalities through enhanced and
improved communities through a range of interventions.  
7.11  Climate Change and Biodiversity Impacts 
None arising from this report. NPF4 and MLDP policies seek to ensure that development
proposals reduce carbon emissions and enhance biodiversity. NPF4 also places a much
greater focus on brownfield redevelopment. 
8.  CONSULTATION  
8.1 This report has been prepared in consultation with the Executive Director Economy,
Enterprise and Operations, Head of Growth, Planning and Climate (Chief Planning
Officer), Chief Financial Officer, Service Manager Housing Strategy, Service Manager Legal
Services, Equal Opportunities Officer and Lissa Rowan, Committee Services Officer and
any comments made have been incorporated into the report.    
Page 185

Page 186

Appendix 1 – Summary of Consultation Representations and Officers’ Response 
Organisation Comment(s) Council
Response
Changes
Proposed to HLA
Altyre Estate Agreement with
status of sites relating
to Altyre Estate.
Noted. No change.
Cairngorms
National Park
Authority (CNPA)
Agreement with
status of sites relating
to CNPA.
Noted. No change.
Homes for
Scotland (HfS)
Queries relating to
planning consents,
developers and
landowners.
Positions relating
to these matters at
the time of the cut-
off date are
provided in the
Schedules of the
HLA.
No change.
Queries relating to
gaps in programming/
delivery.
Clarification has
been provided
directly to HfS. No
changes are
proposed to
projections.
No change.
Various comments
relating to Tulloch of
Cummingston sites.
See Tulloch of
Cummingston
response below.
No change.
Note that Findrassie
(D Parcel) is coming
forward earlier than
programmed.
Developer had not
engaged directly in
the process and
no information has
provided to
support earlier
delivery.
No change.
Scottish and
Southern
Electricity
Networks (SSEN)
No specific
comments. Notes
how the audit can be
incorporated into
planning of network.
Noted. No change.
Scottish Water Updates on
infrastructure status
relating to each site. 
Noted. No change.
Tulloch of
Cummingston
Pending application
for Balnageith (Forres)
so site should be
considered
deliverable.
Position occurred
after the cut-off
date and planning
application is yet
to be determined.
The recent
planning
permission and
the determination
of such will be
reflected in the
No change.
Page 186

Page 187

2026/27 HLA. 
Boundary incorrect in
respect of Chapleton
Farm (Forres). Seek
additional land to be
designated.
Accepted in part.
Matter to be
considered as part
of the Local
Development Plan
process. Further
development will
be reflected in
future HLAs as
appropriate.
Map updated to
reflect ownership.
Update on ownership
at
Sunbank/Kinneddar
and seek land to be
designated.
Matter to be
considered as part
of the Local
Development Plan
process.
No change.
Revised projections
for Manse Road
(Hopeman) and
Inchbroom
(Lossiemouth)
The Manse Road
projections are
noted. The
projections for
Inchbroom
however would
exceed the
number of units
consented for the
site. 
Projections for
Manse Road
(Hopeman)
updated.
Recent consent given
at Commerce House
(Elgin)
Planning consent
was issues after
the cut-off date.
The recent
consent will be
reflected in the
2026/27 HLA.
No change. 
Page 187

Page 188

Moray 
Housing Land Audit 
2025/26
October 2025
Page 188

Page 189

Contents 
1 Introduction and Overview 1
2 Completions 3
3 Housing Land Supply 4
4 Small Sites 6
5 Brownfield Sites 6
6 Windfall Sites 7
7 Long-term Housing Designations 8
8 Housing Land Requirement & 10
Total Deliverable Site Capacity
9 Glossary 13
Page 189

Page 190

Moray Housing Land Audit 2025/26     1
1. Introduction and Overview 
Purpose
1.1. The Housing Land Audit (HLA) provides an overview of Moray’s housing land supply as at 31
March 2025. It is used to monitor and support housing delivery and provides a comparison of
supply with the Local Housing Land Requirement (LHLR) of 5,732 units1. 
1.2. National Planning Framework 4 (NPF4) was published in February 2023 and introduces significant
changes to the development planning system across Scotland. NPF4 Policy 16: Quality Homes
sets out that a local development plan (LDP) should identify a housing target for the area it
covers, in the form of a LHLR. The LHLR represents how much land is required and is expected to
exceed the 10-year Minimum All-Tenure Housing Land Requirement (MATHLR). NPF4 sets the
MATHLR as 3,450 units for Moray. 
1.3. The HLA identifies and provides a programme of expected housing delivery over an initial 10-year
period and the years thereafter. The audit also examines past and future predicted trends in
housing land supply and identifies any action required to address issues arising. This should be
read in conjunction with the Moray Housing Delivery Pipeline. 
1.4. HLA Guidance was published by the Scottish Government on 20 January 2025 to support a
consistent approach to the method and presentation of HLA. The HLA 2024/25 implemented a
number of these changes based on the Scottish Government HLA Feedback Paper from August
2023. Moray Council moved to a financial year audit in 2024, therefore completions for 2023/24
also include calendar months January to March 2023 (identified by an asterisk). The key change
made this year has been modifications to the definitions for the land supply categories (see
Paragraph 1.10). 
1.5. The HLA is made up of two parts: the HLA Report, which provides an analysis of the housing land
supply and the HLA Schedule, which collates detailed information for each site. A spreadsheet of
the HLA Schedule is available on request. 
Methodology and Consultation
1.6. The audit has been prepared by Moray Council using details of all relevant development sites
within the Moray Local Development Plan (MLDP) 2020 and other (windfall) sites with planning
consent for residential use. 
1.7. Completions have been recorded through contact with developers, agents and landowners, site
visits and analysis of building warrant completion certificates. Constraints have been identified
through the LDP process and discussions with statutory consultees. 
1.8. Details of sites with a capacity of 4 or more houses are recorded and an assessment made of
potential future development rates, informed by developers, agents and landowners. This takes
account of planning status, infrastructure constraints, building capacity, market demand and
financial plans. 
1 Moray Local Development Plan 2027: Evidence Report (April 2024)
Page 190

Page 191

1.9. A draft HLA was made available on the Moray Council website for consultation and notification
was sent to Homes for Scotland (HfS), Cairngorms National Park Authority (CNPA), Scottish Water,
BT, Scottish and Southern Electricity Networks (SSEN) as well as developers, agents and
landowners. Responses to the draft HLA were considered by Moray Council in December 2025. 
Land Supply Definitions
1.10. There are three categories of land supply identified within the audit: 
Sites which are free from constraints and can be realistically
programmed in the short/medium/long term. These sites contribute
towards meeting the LHLR. 
Sites with one or more constraints that may be considered deliverable if
action to overcome the constraint can be identified or if they are
constrained only by a lack of market demand. These sites contribute
towards meeting the LHLR. 
Sites with constraints which, at the base date of the audit, have no
known prospect of being resolved. These sites do not contribute towards
meeting the LHLR. 
1.11 Deliverability factors (constraints) that could constrain the deliverability of the site include: 
l Land use status.
l Ownership (includes programming/LONGs).
l Physical conditions (e.g. slope, aspect, flood risk, contamination and pipelines).
l Infrastructure (as defined under ‘Infrastructure first’ in NPF42).
l Financial (e.g. construction costs, deficit funding and marketability). 
2        Moray Housing Land Audit 2025/26
Deliverable 
Deliverable with
Constraints 
Constrained
2 NPF4 Annex F – Glossary of definitions
Page 191

Page 192

2. Completions 
2.1. Table 1 identifies previous completion rates and compares actual completions to the previous
year’s projected programming. 
2015      2016       2017       2018       2019      2020       2021      2022       23/24*   24/25
Programmed   348         365         412         337         304         303         416         500         464         358
Actual               337         335         350         358         414         231         398         418         459         305
Difference (%) -3.2        -8.2         -15          +6.2        +36.1     -23.4      -4.3         -16.4       -1.08       -14.8 
Table 1: Programmed and Actual Housing Completions 
2.2 In 2024/25, there were 305 actual completions compared to the projected 358 units. This is a
difference of 14.8%. This was primarily due to projected completions in Buckie not materialising,
with one of the housebuilders having liquidated. 
2.3 Table 2 identifies projected completion rates for the initial ten-year deliverable housing land
period. These are largely based upon returns from housebuilders and landowners. As part of
School Roll Forecasting, information is also provided to Education Services which includes a
reduced ratio applied to projections within the Housing Land Audit for Elgin and Forres. This is
due to historical accuracies demonstrating that projections can be unrealistic, particularly after
Year 3, compared to actual completions (as demonstrated in Table 1 above). 
25/26        26/27       27/28       28/29       29/30        30/31        31/32       32/33       33/34       34/35      
403            447           387           546           492            555            509           511           486           471 
Table 2: Projected completion rates
Moray Housing Land Audit 2025/26     3Page 192

Page 193

3. Housing Land Supply (as at 31 March 2025) 
Total Site Capacity
3.1. Previously referred to as ‘Established Land Supply’, the total site capacity is the overall number of
units still to be built on each site as at the audit base date of 31 March 2025. The number of units
within each of the land supply categories is summarised in Table 3a and a comparison of the total
site capacity with previous years is shown in Table 3b. 
Site Capacity Status                                                          Units
Deliverable                                                                           4,935
Deliverable with Constraints                                             909
Total Deliverable                                                               5,844
Constrained                                                                          6,365
Total                                                                                      12,209
Table 3a: Total Site Capacity as at 31 March 2025 
2021                             2022                           2023                         2024/25                     2025/26         
12,346                          12,192                        11,770                         12,461                        12,209
Table 3b: Comparison of Total Site Capacity 
3.2 The Total Site Capacity in 2025/26 is 12,209 units. This includes extensive areas of LONG-term
land which function as a reserve and can be released should a shortfall be projected. 
Total Deliverable Site Capacity
3.3 Previously referred to as ‘Effective Land Supply’, the Total Deliverable Site Capacity is the total
capacity of ‘Deliverable’ and ‘Deliverable with Constraints’ sites. In 2025/26, the total deliverable
site capacity is 5,844 units and is shown in Table 4. 
2021                             2022                           2023                         2024/25                     2025/26          
5,508                            5,365                          5,022                           5,303                          5,844
Table 4: Comparison of Total Deliverable Site Capacity (previously Effective Land Supply) 
Deliverable Site Capacity
3.4 The Deliverable Site Capacity in 2025/26 is 4,935 units and the 10-year programming of delivery
for the MLDP area is shown in Table 5. 
4        Moray Housing Land Audit 2025/26
Page 193

Page 194

25/26        26/27       27/28       28/29       29/30        30/31        31/32       32/33       33/34       34/35    
403            447           352           402           366            450            362           343           326           286
Table 5: Deliverable Site Capacity programmed rates 
Deliverable with Constraints Site Capacity
3.5 The Deliverable with Constraints Site Capacity at 2025/26 is 909 units. The 10-year programming
of delivery for the MLDP area is showing Table 6. 
25/26        26/27       27/28       28/29       29/30        30/31        31/32       32/33       33/34       34/35      
0                0              17             67             80             102            137           106            46             69
Table 6: Deliverable with Constraints Site Capacity programmed rates 
Constrained Site Capacity
3.6 The Constrained Site Capacity is shown in Table 7a. 
2021                             2022                           2023                         2024/25                     2025/26          
6,838                            6,827                          6,748                           7,158                          6,365
Table 7a: Comparison of Constrained Site Capacity 
3.7 A total of 6,365 units is constrained in 2025/26 - a reduction from 7,158 in 2024/25 which reflects
the continued more proactive approach being taken to overcome constraints and explore ways of
unlocking sites. Table 7b below summarises the constrained sites and the nature of the
constraint. The table shows that the majority of these sites are constrained through ownership.
LONG sites can only be considered deliverable when the required triggers for release of LONG
sites have been met and the site is free of, or there is a commitment to overcoming, the
constraints listed in paragraph 1.11. 
Constraint                                          No. of Units                                         No. of Sites                    
Financial                                                    240                                                           4               
Infrastructure                                                193                                                           8                  
Ownership                                                 1,905                                                        17
Ownership (Programming (LONG))                         3,825                                                         8          
Physical Conditions                                           202                                                           6                       
Total                                                      6,365                                                        43
Table 7b: Analysis of Constraints 
3.8 Land supply (site capacity) which is only constrained by marketability are now categorised as
Deliverable with Constraints and are no longer included in the Constrained Site Capacity. 
Moray Housing Land Audit 2025/26     5Page 194

Page 195

6        Moray Housing Land Audit 2025/26
4. Small Sites 
4.1. In addition to sites with consents for a capacity of 4 units and over outwith settlements (Rest of
Moray (ROM)), there are a number of consents granted for sites (both urban and rural) with a
capacity of 1 to 3 units which cumulatively make a significant contribution to the housing land
supply. Table 8 identifies previous completion rates.           
2020                             2021                           2022                        2023/24*                    2024/25            
N/A                                 50                               70                                 73                               60
Table 8: Small Sites completion rates 
4.2 A programmed supply for small housing sites is provided in this audit based on the average of
the last 5 years of small site completions and rural communities’ contribution agreed with Homes
for Scotland. This will be monitored and reviewed on an annual basis. 
5. Brownfield Sites 
5.1. NPF4 Policy 9: Brownfield, vacant and derelict land and empty buildings aims to encourage,
promote and facilitate the reuse of brownfield, vacant and derelict land and empty buildings and
to help reduce the need for greenfield development. Tables 9a and b identifies previous and
projected completion rates on brownfield sites. 
2020            2021             2022        2023/24*     2024/25                      
15                 55                 10                 18                  4 
5.6% 
Table 9a: Brownfield sites completion rates 
2025/26      2026/27      2027/28       2028/29      2029/30                       
26                 57                 22                 28                 37 
7.5% 
Table 9b: Brownfield sites projected completion rates 
5.2 As set out in the MLDP 2027 Evidence Report, Moray Council have proposed targets of 10% and
5% of housing completions over the next 10 years for brownfield sites and within town centres,
respectively. Whilst these targets are considered to be ambitious, it is recognised that this will be
dependent upon availability of staff and financial resources to tackle the complexity of brownfield
site redevelopment. 
Brownfield sites completions
Percentage of total completions 
2020 - 2024/25
Brownfield sites projected
completions
Percentage of total projected
completions 2025-2030
Page 195

Page 196

6. Windfall Sites 
6.1. A windfall site is a site not specifically allocated for development in the LDP but which becomes
available for development or is granted planning permission during the lifetime of the Plan.
Windfall completions can make a significant contribution to the land supply. 
6.2. Tables 10a and b set out the previous and projected completion rates on windfall sites. 
2020                             2021                           2022                        2023/24*                    2024/25             
22                                  47                               14                                 14                               13  
Table 10a: Windfall site completion rates 
2025/26                       2026/27                     2027/28                      2028/29                     2029/30             
39                                  59                               15                                 20                               23  
Table 10b: Windfall site projected completion rates 
6.3 Windfall sites continue to demonstrate the historical trend of varied annual completions and
projections. 
Moray Housing Land Audit 2025/26     7Page 196

Page 197

7. Long-Term Housing Designation 
7.1. Long-term (LONG) designations have been identified to set out the direction of growth and to
assist in the forward planning of infrastructure and landscape enhancement/mitigation. The
Council will evaluate the need for early release of long-term housing land through the annual
Housing Land Audit process and monitoring report. 
7.2. The release of LONG-term designations is controlled through the Policy DP3 LONG Term Land
Reserves of the MLDP 2020. The triggers are a shortfall in the 10-year total deliverable site
capacity (housing land supply) or shortfall in projected delivery of housing land is identified in the
annual Housing Land Audits, which cannot be met by:- 
1. Windfall provision assuming previous trends; 
2. sites which are likely to become available for development to meet the shortfall in the relevant
timeframe; or 
3. Where the release of LONG-term land is required to deliver key objectives of the Council or its
Community Planning Partners set out in the Local Outcome Improvement Plan, or to meet
significant increased demand for housing arising from personnel deployment at RAF
Lossiemouth or Kinloss Barracks. 
In these circumstances, an appropriate release of LONG-term land may be recommended where:- 
l This can be achieved without compromising delivery of a master-planned approach and where
appropriate access, infrastructure and landscaping setting can be secured.
l The site is demonstrated to be effective within the next five years. 
l Any site specific triggers are fully complied with. 
7.3. The amount of land to be released will be dependent upon an assessment of what other sites will
become effective to ensure a continuous 5-year deliverable site capacity. A shortfall of deliverable
housing land in one of the 8 main towns should be met through a LONG-term release in the
same town. 
7.4. Where a decision is made to release LONG term land and there is more than one LONG term site
is that settlement, an assessment will be made as to which site is considered the most suitable
based on considerations such as infrastructure, landscaping, settlement pattern and
effectiveness. 
7.5. Outwith the eight main towns, LONG term sites will only be considered for early release where
the residential land designations are clearly demonstrated to be constrained for the entire plan
period and that constraint cannot be overcome.
8        Moray Housing Land Audit 2025/26
Page 197

Page 198

Table 11: LONG Term Sites 
Moray Housing Land Audit 2025/26     9
Settlement 
Alves 
Buckie 
Burghead 
Elgin 
Elgin 
Fochabers 
Forres 
Keith 
Urquhart
Site 
North 
South West 
Clarkly Hill 
North East 
South 
Ordiquish
Road East 
Lochyhill 
Nursery Field 
Meft Road
Comment/Triggers 
No deliverable site capacity. 
Total deliverable site capacity of
761 units in LHMA, projected 10-
year completions of 650 units. 
Total deliverable site capacity of
2,766 units in LHMA, projected
10-year completions of 84 units. 
Total deliverable site capacity of
2,766units in LHMA, projected 10-
year completions of 1,691 units. 
Total deliverable site capacity of
2,766 units in LHMA, projected
10-year completions of 1,691
units. 
Total deliverable site capacity of
2,205 units in LHMA, projected
10-year completions of 78 units. 
Total deliverable site capacity of
1,135 units in LHMA, projected
10-year completions of 563 units
.
Total deliverable site capacity of
210 units in LHMA, projected 10-
year completions of 166 units. 
Total deliverable site capacity of
2,205 units in LHMA, projected
10-year completions of 24 units.
Recommendation 
No requirement to release. 
Part of the site received
planning permission in
2024/25. No requirement to
release remainder of site (see
para 8.3). 
No requirement to release. 
No requirement to release. 
Amendment to Elgin South
phasing approved in 2021. No
requirement to release. 
No requirement to release. 
No requirement to release. 
Site released in 2023. 
No requirement to release. 
Page 198

Page 199

8. Housing Land Requirement & Total Deliverable Site Capacity 
8.1. The Council’s HNDA 2017 has informed the housing land supply and housing completions targets
set out in the MLDP2020. These have been updated in the Evidence Report submitted to the
Scottish Government as part of the preparation of the MLDP 2027 and are based upon the HNDA
2023, which has been signed off as robust and credible by the Scottish Government's Centre for
Housing Market Analysis. The key targets reflect the MATHLR set out in NPF4 and are: 
l Annual housing completion target (HNDA Growth scenario) - 440 units 
l Annual total deliverable site capacity target - 500 units 
8.2. Using these figures gives a 10-year completion target of 4,400 units and a 10-year total
deliverable site capacity target of 5,000 units. 
Site Capacity                               No. of years supply
Total                                                                         12,209                                                    24.4
Total Deliverable                                                   5,844                                                     11.6
Constrained                                                            6,365                                                     12.7 
Table 12a: Site Capacity and Supply
10        Moray Housing Land Audit 2025/26
Page 199

Page 200

Table12b: Deliverable Site Capacity and completion targets by LHMA. 
8.3 Whilst it appears there is a deficit of deliverable site capacity in the Buckie HMA, projections
include sites which are currently constrained. The increase in projected completions reflects the
focus of projects such as the Growth Deal Housing Mix in overcoming constrained development
in the coastal settlements. 
8.4 The totals of the total deliverable, constrained and total site capacities are set out in Table 12c
below. 
2020                2021               2022               2023                2024/25         2025/26
Total Deliverable      5,638               5,508              5,365              5,022                5,303              5,844
Constrained               6,890               6,838              6,827              6,748                7,158              6,365
Total Site Capacity   12,528             12,346            12,192            11,770             12,461            12,209 
Table 12c: Moray Total Site Capacity 2025/26 
Moray Housing Land Audit 2025/26     11
Comments 
Deficit of deliverable
site capacity. 
Surplus of deliverable
site capacity. 
Surplus of deliverable
site capacity. 
Surplus of deliverable
site capacity. 
Surplus of deliverable
site capacity. 
Surplus of deliverable
site capacity.
10 year
completion
target 
(10 x 440) 
4,400 
10 year 
projected 
completions 
1,005 
2,325 
757 
286 
434 
4,807
10 year total
deliverable
site capacity 
2025-2034 
893 
2,898 
1,267 
342 
444 
5,844
10 year total
deliverable site
capacity target
(10 x 500) 
727 
2,728 
741 
427 
377 
5,000
LHMA 
Buckie 
Elgin 
Forres 
Keith 
Speyside 
Total 
Page 200

Page 201

12        Moray Housing Land Audit 2025/26
TOW
N
ABERLOUR
ALVES
ARCHIESTOW
N
BUCKIE
BURGHEAD
CRAIGELLACHIE
CULLEN
CUM
M
INGSTON
DALLAS
DUFFTOW
N
DYKE
ELGIN
FINDHORN
FINDOCHTY
FOCHABERS
FORRES
GARM
OUTH
/ KINGSTON
HOPEM
AN
KEITH
KINLOSS
LHANBRYDE
LOSSIEM
OUTH
M
OSSTODLOCH
NEW
M
ILL
PORTGORDON
PORTKNOCKIE
RAFFORD
REM
AINDER OF M
ORAY
ROTHES
ROTHIEM
AY
TOM
INTOUL
URQUHART
Total                                  
2024       
2025       
2026      
2027       
2028       
2029       
2030       
2031       
2032      
2033       
2034       
2035
0       0   
138 9  2 75  6  0  18      60    
308
41   26    0   
162 9  5 41  10 30 1  18      60    
403
33   35    1   1
188 11  8 58  16  2 12 18      60    4
447
2  1 67 8   0   0
109 2  8 34  8 6 3 20 17   10 12 12 60   4 4
387
2   73 8 12 20 1   1
180 1  8 64  8 6 5 42 12   10 12  60 15  4 2
546
1  4 44 14  12 0   0
171  12 8 63  8 16 3 27 12   10 12  60 15   
492
3 72 8  12 1  20 1
205  16 3 63  8 36 5  12   10 12  60   4 4
555
4 76 12  11  2 25 
132  16 8 82 2 8 26 3  12   10 12  60   4 4
509
30  3 77 14    2 20 
171  16 10 52 2 3 26 3  12   10   60    
511
4
105 10    2 20 
188   10 42 2  10 3  17      60 10   3
486
3 75 10     20 
185   10 64 2  10 2  17      60 10   3
471
250 18
451
130 10   4  5
4625   97
1070 2 
115   76
420 10    60 20 35  4
7,402
Page 201

Page 202

9. Glossary
Moray Housing Land Audit 2025/26     13
Constrained site
Sites with constraints which, at the base date of
the audit, have no known prospect of being
resolved. These sites do not contribute towards
meeting the LHLR. 
Deliverable site
Sites which are free from constraints and can be
realistically programmed in the
short/medium/long term. These sites contribute
towards meeting the LHLR. 
Deliverable with constraints site
Sites with one or more constraints that may be
considered deliverable if action to overcome the
constraint can be identified or if they are
constrained only by a lack of market demand.
These sites contribute towards meeting the LHLR. 
Deliverable housing pipeline
The expected sequencing of the Local Housing
Land Requirement over the short (1-3 years),
medium (4-6 years) and long-term (7-10 years), as
set out in the Local Development Plan Delivery
Programme. 
Delivery Programme
A document which sets out how the Local
Development Plan will be delivered. 
Evidence Report
Supporting document to the Local Development
Plan which summarises the evidence base for
proposals and policies set out in the
development plan. 
Housing Land Audit (HLA)
Annual audit which monitors the delivery of
housing land, including past completions and
future programming. 
Housing Needs and Demand Assessment
(HNDA)
A tool used to estimate housing need and
demand across various housing tenures to
inform the development of the Local Housing
Strategy and Local Development Plan. 
Local Housing Market Area (LHMA)
A geographical area defined by household
demand and preferences for all types of housing,
reflecting the key functional linkages between
places where people live and work. 
Local Housing Strategy (LHS)
Strategy that sets out the outcomes that the
Council and its partners want to achieve, and the
action they will take, to address housing need
and demand in their areas. 
Local Development Plan (LDP)
A plan in which it is sets out, for land in the part
of the district to which it relates: 
l a spatial strategy, being a detailed
statement of the planning authority's
policies and proposals as to the
development and use of the land;
l such other matters as may be prescribed;
and
l any other matter which the planning
authority consider it appropriate to
include. 
Local Housing Land Requirement (LHLR) 
The amount of land required for housing, as
identified by the LDP. The LHLR is expected to
exceed the 10-year Minimum All-Tenure Housing
Land Requirement (MATHLR) set out in the
National Planning Framework. 
Page 202

Page 203

Minimum All-Tenure Housing Land Requirement (MATHLR)
The minimum amount of land, by reference to the number of housing units, that is to be provided by
each planning authority in Scotland for a 10-year period, as set out in NPF4 Annex E. The MATHLR is
expected to be exceeded in the LDP’s LHLR. 
National Planning Framework (NPF) 4
A long-term plan looking to 2045 that guides spatial development, sets out national planning policies,
designates national developments and highlights regional spatial priorities. 
The following definitions and classification in the schedules apply:
14        Moray Housing Land Audit 2025/26
Site Ref                    Area/Settlement or Parish/Residential/Sequential Reference Number.
Location                  Address of Site.
Owner                      Current owner of the site. 
Developer               Agency responsible for the development and management of the site and                                  
not necessarily to the actual construction company.
Tenure                     Five tenure types are specified:-                                  
HA - Housing Association for rent                                  
LA - Local Authority                                  
PRIV - Private 
MOD - Ministry of Defence                                  
Other - Other tenure, i.e. housing association shared ownership or low                                  
cost home ownership and joint venture between a local authority and a                                  
private developer.
Area                         Site areas are quoted in hectares and represent the gross area of the site.
Units                        The capacity of sites is expressed as a number of house units.  For sites                                  
where no detailed housing layout has yet been prepared and no density has                                  
been specified, then an estimate has been made.
Serviced                  Indicates the number of housing units which are serviced.
Not built                 Total number of house units on the site which have not yet been built at the                                  
date of the update.
Effective                  Currently effective (EFF) or constrained (CON)
LPR                           Local Plan Site Reference
Page 203

Page 204

Moray Housing Land Audit 2025/26     15
Land Use                 Categorises the main existing or former use of a site before it is re-zoned or                                  
developed. The land use categories used are:-                                  
AGR 1-7 Agricultural Land by Class (1, 2 & 3.   1 = prime)                                  
AG BLDG Agricultural Building                                  
WOOD Woodlands (may also be grazed)                                  
HORT Allotments and nurseries                                  
PRIV/PUB OS Privately or publicly owned open space (e.g. Grounds of a                                  
large house or hospital)                                  
RESID Residential                                  
COMM Commercial                                  
EDUC Educational                                  
RAIL Railway                                  
MOD Ministry of Defence                                  
PUB BLD Public Building                                  
UNUSED Derelict, Vacant, Backland etc.                                  
COMMTY Community                                  
IND Industry
Greenfield/             Describes whether the site is within an urban area or previously developed 
Brownfield             (brownfield) or outwith the urban area and not previously developed (green
field).
APPLICATION DETAILS 
Applic Ref               Reference number of planning applications relating to the development of                                  
the site. Note where applications are made for individual plots within a site,                                  
these have been grouped together under the Application Reference                                  
‘Individs’ with no decision date given.
Units                        Number of units relating to each planning application.
Type                         Describes the type of permission application:-                                  
OUT Application for Outline Planning Permission                                  
DET Application for Full Permission or Permission of Reserved Matters
Decision                  Details of decision on the application.  Apart from self explanatory terms –                                  
Approved, Refused, Withdrawn, Expired, Pending, it has been necessary to                                  
indicate the latest classified either as ‘Superseded’ or ‘Duplicate’.
Dec. Date                Date of final decision on the application. 
COMPLETION DETAILS 
Built                         Take up rates (in house units) for the previous 5 years are listed on an                                  
annual basis and assessments of subsequent completions are also listed                                  
annually for the next 5 years.
Page 204

Page 205

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
ABERLOUR
9TOMBAIN FARMM/AB/R/010 Mr Simon Gibbs20/R1
100SPEYVIEW Springfield Properties PlcM/AB/R/15/04 Springfield Properties & Moray Coun20/R2
Total Town Units 109 Total Town Site 2
ARCHIESTOWN
20EAST ENDM/AR/R/07/01 Mr Edward Aldridge20/R1
4SOUTH LANEM/AR/R/15/02 Mr Robert Gordon & Mr Alan Williams20/R2
6WEST ENDM/AR/R/15/03 Mrs Anne Ogg20/R3
10SOUTH OF VIEWMOUNTM/AR/R/15/04 Mr Robert Gordon20/R4
Total Town Units 40 Total Town Site 4
BUCKIE
5PARKLANDS MPD HomesM/BC/R/035 MPD Homes15/R2
20MILLBANK GARAGE MPD HomesM/BC/R/041 MPD Homes20/OPP7
140LAND AT MUIRTONM/BC/R/20/07 Mr Alan Durno20/R7
250LAND AT BARHILL ROAD Springfield Properties PlcM/BC/R/20/08 Mr Michael Watt20/R8
100HIGH STREET (W)M/BC/R/20/MU 20/MU
11MILL OF BUCKIEM/BC/R/20/W1 Mr Fredrick Parkes20/R10
Total Town Units 526 Total Town Site 6
BURGHEAD
14NORTH QUAYM/BH/R/006 Unknown (A) and Margery Bray (B)20/R1
80CLARKLY HILL Tulloch of CummingstonM/BH/R/04 Tulloch of Cummingston20/R2
Total Town Units 94 Total Town Site 2
Page 205

Page 206

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
CRAIGELLACHIE
12BRICKFIELDM/CR/R/003 Strathdee Properties20/R3
Total Town Units 12 Total Town Site 1
CULLEN
55SEAFIELD ROADM/CL/R/15/02 Seafield Estate20/R1
Total Town Units 55 Total Town Site 1
CUMMINGSTON
3SEAVIEW ROAD Tulloch of CummingstonM/CM/R/02 Tulloch of Cummingston20/R1
Total Town Units 3 Total Town Site 1
DUFFTOWN
5OLD MART ROADM/DF/R/012 Moray Council20/OPP1
100HILLSIDE FARMM/DF/R/15/03 Mr James Wiseman20/R1
Total Town Units 105 Total Town Site 2
DYKE
3FIR PARK ROADM/DY/R/20/03 Ms Ros Davidson20/R3
Total Town Units 3 Total Town Site 1
Page 206

Page 207

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
ELGIN
102BILBOHALL SOUTH Grampian Housing A.M/EL/R/07/05 Grampian Housing A.20/R3
8THE FIRS, BILBOHALL Moray CouncilM/EL/R/093 Moray Council20/R7
85KNOCKMASTING WOOD Scotia HomesM/EL/R/15/12 Scotia Homes20/R6
10HAMILTON DRIVE MPD HomesM/EL/R/15/13 20/R9
70LESMURDIE FIELDS Robertson Residential GroupM/EL/R/15/14 Robertson Residential Group20/R13
106EDGAR ROADM/EL/R/20/02 Moray Council20/R2
609EASTER LINKWOOD AND LINKWOOD Springfield Properties PlcM/EL/R/20/19 Mr Ian Robertson20/R19
6GLASSGREEN, ELGIN SOUTH Springfield Properties PlcM/EL/R/20/20 Springfield Properties Plc20/R20
584ELGIN SOUTH (GRASSGREEN,
BURNSIDE & CEMETERY)
Springfield Properties PlcM/EL/R/21/L2 Springfield Properties Plc20/LONG2
24BAIN AVENUE Springfield Properties PlcM/EL/R/23/01 20/ENV2+3
173FINDRASSIE (E PARCEL) Barratt Homes/David Wilson HomesM/EL/R/23/02 Barratt Homes20/R11
266FINDRASSIE (D PARCEL) Robertson Residential GroupM/EL/R/23/03 Pitgaveny Estate20/R11
12OLDMILLS ROAD Tulloch of CummingstonM/EL/R/23/W1 Tulloch of Cummingston20/ENV6
38SOUTH STREET Moray Council/Robertson GroupM/EL/R/25/01 Moray Council/Robertson Group
21161-163 HIGH STREET
(POUNDLAND)
M/EL/R/TC/01 Poundland Elgin Ltd20/TC
442 BATCHEN STREETM/EL/R/TC/04 Mr Richard Ham20/TC
Total Town Units 2118 Total Town Site 16
FINDHORN
2HEATHNEUKM/FH/R/009 Mr Tim Clark20/R1
20NORTH WHINS Duneland LtdM/FH/R/11
1RESIDENTIAL CARAVANSM/FH/R/20/RC 20/RC
Total Town Units 23 Total Town Site 3
Page 207

Page 208

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
FINDOCHTY
60MORVEN CRESCENTM/FN/R/009 Seafield Estate20/R1
Total Town Units 60 Total Town Site 1
FOCHABERS
40ORDIQUISH ROAD Bob Milton PropertiesM/FO/R/07/01 Bob Milton Properties20/R1
50ORDIQUISH ROAD WEST Bob Milton PropertiesM/FO/R/07/02 Bob Milton Properties20/R2
50ORDIQUISH ROAD EASTM/FO/R/20/04 Crown Estate Scotland20/R4
Total Town Units 140 Total Town Site 3
FORRES
48CAROLINE STREETM/FR/R/060 AES Solar20/OPP1
79FERRYLEA Springfield Properties PlcM/FR/R/07/03 Springfield Properties Plc20/R2
40MANNACHIE Tulloch of CummingstonM/FR/R/07/08 Tulloch of Cummingston20/R4
136DALLAS DHUM/FR/R/15/10 Altyre Estate20/R6
260LOCHYHILL (AREA A) Robertson Residential GroupM/FR/R/23/01 White Family20/R3
500LOCHYHILL (AREA B) Robertson Residential GroupM/FR/R/23/02 White Family20/R3
4CHAPELTON FARM Tulloch of CummingstonM/FR/R/24/W1 Tulloch of Cummingston
Total Town Units 1067 Total Town Site 7
HOPEMAN
69MANSE ROAD Tulloch of CummingstonM/HP/R/15/R1 Tulloch of Cummingston20/R1
Total Town Units 69 Total Town Site 1
Page 208

Page 209

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
KEITH
6BALLOCH ROADM/KH/R/030 Mr and Mrs N. Howie20/R3
58BANFF ROAD NORTH Springfield Properties PlcM/KH/R/07/08 Moray Council20/R4
12NEWMILL SOUTH ROADM/KH/R/15/036 ACE Roofing (Keith)20/OPP3
70NURSERY FIELD LONG1M/KH/R/20/LG1 Moray Council20/LONG1
50BANFF ROAD SOUTHM/KH/R/20/MU 20/MU
4138-140 MID STREETM/KH/R/TC/02 Mr Barry Fettes
Total Town Units 200 Total Town Site 6
KINLOSS
6WEST OF SEAPARK HOUSEM/KN/R/003 Seapark Estate Ltd20/R1
1FINDHORN ROAD WEST MPD HomesM/KN/R/009 MPD Homes20/R2
23DAMHEADM/KN/R/07/04 The Rhind 2008 Discretionary Trust20/R3
Total Town Units 30 Total Town Site 3
LHANBRYDE
77WEST OF ST ANDREWS ROAD Springfield Properties PlcM/LH/R/07/01 Springfield Properties Plc20/R1
24GARMOUTH ROAD Grampian Housing AssociationM/LH/R/20/02 Moray Council20/R2
Total Town Units 101 Total Town Site 2
LOSSIEMOUTH
17INCHBROOM Tulloch of CummingstonM/LS/R/023 Tulloch of Cummingston20/R3
21WEST BASIN, LOSSIEMOUTH
MARINA
Oakbank HomesM/LS/R/039
185SUNBANK/KINNEDDAR Tulloch of CummingstonM/LS/R/07/01 Tulloch of Cummingston20/R1
Total Town Units 223 Total Town Site 3
Page 209

Page 210

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
PORTGORDON
60WEST OF REID TERRACEM/PG/R/07/04 Colin Murray Developments20/R1
Total Town Units 60 Total Town Site 1
PORTKNOCKIE
60SEABRAESM/PK/R/004 Seafield Estate20/R1
Total Town Units 60 Total Town Site 1
RAFFORD
12BROCHLOCHM/RF/R/07/01 Finderne Development Trust20/R1
Total Town Units 12 Total Town Site 1
REMAINDER OF MORAY
660SITES BELOW 5 HOUSES PRIVATEM/RM/R/999B PRIVATELDP
Total Town Units 660 Total Town Site 1
ROTHES
30SPEY STREETM/RS/R/07/01 Mr & Mrs Scott20/R1
Total Town Units 30 Total Town Site 1
ROTHIEMAY
10CASTLE TERRACEM/RT/R/001 Mr Robert Thain20/R1
Total Town Units 10 Total Town Site 1
Page 210

Page 211

The Moray Council Housing Land Audit 2025DELIVERABLE HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan
TOMINTOUL
8CONGLASS LANEM/TO/R/21/01 Crown Estate ScotlandCNPA21/H1
8LECHT DRIVEM/TO/R/21/02 Crown Estate ScotlandCNPA21/H2
Total Town Units 16 Total Town Site 2
URQUHART
10MEFT ROAD Findrassie Developments LtdM/UR/R/20/01 Findrassie Developments Ltd20/R1
8STATION ROADM/UR/R/20/02 Mr Ian Dean20/R2
Total Town Units 18 Total Town Site 2
5844Total Deliverable Housing Land Supply 75Total Sites
Page 211

Page 212

The Moray Council Housing Land Audit 2025CONSTRAINED HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan Constraint Details
ALVES
250 OwnershipConstrainedALVES NORTHM/AL/R/15/LON The Moray Council20/LONG
Total Town Units 250 Total Town Sites 1
BUCKIE
60 InfrastuctureConstrainedRATHBURN (N)M/BC/R/015 Reidhaven Estate20/R3
60 OwnershipConstrainedRATHBURN (S)M/BC/R/07/07 Reidhaven Estate20/R4
200 FinancialConstrainedHIGH STREET (E)M/BC/R/07/10 J.M. Watt20/R5
5 OwnershipConstrainedSITE AT ARDACH HEALTH CENTREM/BC/R/20/09 Moray Council20/R9
250 OwnershipConstrainedLAND TO SOUTH WEST OF BUCKIE Springfield Properties PlcM/BC/R/20/LG1 Mr Michael Watt20/LONG1
Total Town Units 575 Total Town Sites 5
BURGHEAD
40 Physical ConditionsConstrainedWEST FORESHORE Tulloch of CummingstonM/BH/R/012 Moray Council/ToC/John Gordon20/OPP1
80 OwnershipConstrainedLONG1 CLARKLY HILL Tulloch of CummingstonM/BH/R/20/LNG Tulloch of Cummingston20/LONG1
Total Town Units 120 Total Town Sites 2
CRAIGELLACHIE
5 Physical ConditionsConstrainedEDWARD AVENUEM/CR/R/001 Bacardi20/R1
5 OwnershipConstrainedFORMER BREWERY, SPEY ROADM/CR/R/004 Bacardi20/R2
Total Town Units 10 Total Town Sites 2
DALLAS
6 InfrastuctureConstrainedDALLAS SCHOOL WESTM/DA/R/001 Dallas Estate20/R1
4 FinancialConstrainedFORMER FILLING STATIONM/DA/R/002 Mr Ian Thomson20/R3
Total Town Units 10 Total Town Sites 2
Page 212

Page 213

The Moray Council Housing Land Audit 2025CONSTRAINED HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan Constraint Details
DYKE
5 InfrastuctureConstrainedSOUTH DARKLASS ROADM/DY/R/15/02 Mr Grant Davidson20/R2
Total Town Units 5 Total Town Sites 1
ELGIN
40 InfrastuctureConstrainedBILBOHALL NORTH Robertson Residential GroupM/EL/R/048 Robertson Residential Group20/R1
107 Physical ConditionsConstrainedSOUTH WEST OF ELGIN HIGH
SCHOOL
M/EL/R/07/06 Mr Dean Andersson20/R4
12 InfrastuctureConstrainedNEWFIELD HOUSE, LOSSIEMOUTH
ROAD
M/EL/R/081 Mr Ian Aitkenhead
20 OwnershipConstrainedPALMERS CROSSM/EL/R/082 Edgar Road Properties Ltd20/R21
190 OwnershipConstrainedBARMUCKITY Springfield Properties PlcM/EL/R/088 Mr Ian Robertson20/R16
50 OwnershipConstrainedSPYNIE HOSPITALM/EL/R/094 NHS Grampian20/R14
1800 OwnershipConstrainedLONG1 A/B NORTH EASTM/EL/R/15/LNE Pitgaveny Estate20/LONG1
50 OwnershipConstrainedBILBOHALL WESTM/EL/R/20/05 Mr Dean Anderson20/R5
150 OwnershipConstrainedFINDRASSIE (R12 PARCEL)M/EL/R/20/12 Pitgaveny Estate20/R12
1000 OwnershipConstrainedELGIN SOUTH LONG2 Springfield Properties PlcM/EL/R/20/L2 20/LNG2
260 OwnershipConstrainedFINDRASSIE (W PARCEL)M/EL/R/23/04 Pitgaveny Estate20/R11
519 OwnershipConstrainedFINDRASSIE (N PARCEL)M/EL/R/23/05 Pitgaveny Estate20/R11
Total Town Units 4198 Total Town Sites 12
FOCHABERS
35 OwnershipConstrainedORDIQUISH ROAD EAST LONGM/FO/R/15/LG Crown Estate Scotland20/LONG
Total Town Units 35 Total Town Sites 1
Page 213

Page 214

The Moray Council Housing Land Audit 2025CONSTRAINED HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan Constraint Details
FORRES
24 FinancialConstrainedAUCTION MART, TYTLER STREET Cairn Housing AssociaionM/FR/R/057 20/OPP4
400 OwnershipConstrainedLOCHYHILL LONG1M/FR/R/07/11 White Family20/LONG1
12 FinancialConstrainedBALNAGEITH Tulloch of CummingstonM/FR/R/15/08 Tulloch of Cummingston20/R5
40 Physical ConditionsConstrainedPILMUIR ROAD WESTM/FR/R/15/11 G & AG Proctor20/R7
90 OwnershipConstrainedLOCHYHILL (AREA C) Robertson Residential GroupM/FR/R/23/03 White Family20/R3
Total Town Units 566 Total Town Sites 5
GARMOUTH/KINGSTON
10 InfrastuctureConstrainedSOUTH OF INNES ROADM/GM/R/15/01 20/R1
Total Town Units 10 Total Town Sites 1
KEITH
36 OwnershipConstrainedDUNNYDUFF ROADM/KH/R/015 Various20/R2
40 InfrastuctureConstrainedEDINDIACH ROAD (EAST)M/KH/R/07/15 20/R8
5 Physical ConditionsConstrainedDENWELL ROADM/KH/R/20/08 20/R7
Total Town Units 81 Total Town Sites 3
MOSSTODLOCH
60 OwnershipConstrainedGARMOUTH ROADM/MS/R/15/02 Crown Estate Scotland20/R2
10 OwnershipConstrainedBALNACOULM/MS/R/20/03 Forestry and Land Scotland20/OPP1
350 OwnershipConstrainedSOUTH OF A96M/MS/R/20/MU Crown Estate Scotland20/MUL1
Total Town Units 420 Total Town Sites 3
Page 214

Page 215

The Moray Council Housing Land Audit 2025CONSTRAINED HOUSING LAND SUPPLY
Reference Location Developer Undeveloped (Units)OwnerLocal Plan Constraint Details
NEWMILL
10 OwnershipConstrainedISLA ROADM/NM/R/001 Newmill Estate20/R1
Total Town Units 10 Total Town Sites 1
ROTHES
40 OwnershipConstrainedGREEN STREETM/RS/R/15/02 Mr Stewart Meldrum20/R2
Total Town Units 40 Total Town Sites 1
ROTHIEMAY
5 Physical ConditionsConstrainedANDERSON DRIVEM/RT/R/07/02 Mrs H. Mackenzie20/R2
20 InfrastuctureConstrainedDEVERONSIDE ROADM/RT/R/15/03 The Church of Scotland20/R3
Total Town Units 25 Total Town Sites 2
URQUHART
10 OwnershipConstrainedMEFT ROAD LONG1M/UR/R/20/L1 Rattray Family20/LNG1
Total Town Units 10 Total Town Sites 1
6365Total Constrained Housing Land Supply 43Total Sites
Page 215

Page 216

SITE REF: M/AB/R/010
LOCATION: TOMBAIN FARM
Units Not Built
Total Units 10Capacity:
Planning Applications:
ABERLOUR The Moray Council Housing Land Audit 2025
Easting: 326135 Northing: 842322
Area (Ha): 2.18
Primary School: Aberlour Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 9
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land: 2003
Owner: Mr Simon Gibbs Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/00376 Full Approved 30/05/2025 Plot 5
20/00317 5 Full Approved 29/03/2022 Phase 1
18/01457 Full Approved 13/02/2019 Plot 12
16/01350 Full Approved 20/10/2016 Plot 12
13/01619 Full Approved 11/11/2013 Extend planning
consent (07/01651)
13/01618 Full Approved 31/10/2013 Extend planning
consent (07/01634)
07/01651 7 Full Appeal 05/09/2008 Approved on appeal
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
0 2 2 2 2 1
9
10Market
0Affordable
9
4Flat
6House
Page 216

Page 217

SITE REF: M/AB/R/15/04
LOCATION: SPEYVIEW
Units Not Built
Total Units 100Capacity:
Planning Applications:
ABERLOUR The Moray Council Housing Land Audit 2025
Easting: 325786 Northing: 841867
Area (Ha): 14.02
Primary School: Aberlour Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 100
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2018
Owner: Springfield Properties & Moray Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/00043 31 Full Approved 17/06/2024 Phase 2
23/00494 39 Full Approved 21/12/2023 Phase 1
21/00348 Full Expired 19/04/2022 Plot substitution (private
to affordable)
18/01373 39 Full Expired 12/11/2019 Phase 1
18/01132 PAN for residential
development
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
39 31 30
100
22Market
78Affordable
100
20Flat
50House
30Unknown
Page 217

Page 218

SITE REF: M/AL/R/15/LON
LOCATION: ALVES NORTH
Units Not Built
Total Units 250Capacity:
Planning Applications:
ALVES The Moray Council Housing Land Audit 2025
Easting: 313538 Northing: 862518
Area (Ha): 23.11
Primary School: Alves Primary School
Secondary School: Forres Academy
Ward: Heldon And Laich
Effective Land 0
Supply Type: Constrained
LPR: 20/LONG
Tenure:
Projected Completions:
Constrained Land 250
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG) and ownership
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: The Moray Council Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
250
250
187Market
63Affordable
250Unknown
Page 218

Page 219

SITE REF: M/AR/R/07/01
LOCATION: EAST END
Units Not Built
Total Units 20Capacity:
Planning Applications:
ARCHIESTOWN The Moray Council Housing Land Audit 2025
Easting: 323338 Northing: 844111
Area (Ha): 1.28
Primary School: Knockando Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 20
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2007
Owner: Mr Edward Aldridge Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
3 3 3 3 3 3 2
20
15Market
5Affordable
18
20Unknown
Page 219

Page 220

SITE REF: M/AR/R/15/02
LOCATION: SOUTH LANE
Units Not Built
Total Units 4Capacity:
Planning Applications:
ARCHIESTOWN The Moray Council Housing Land Audit 2025
Easting: 323201 Northing: 844079
Area (Ha): 0.58
Primary School: Knockando Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 4
Supply Type: Deliverable with
Constraints
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Mr Robert Gordon & Mr Alan W Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
06/02500 1 Outline Refused 18/12/2006
05/01395 1 Full Refused 18/11/2005
05/01605 1 Outline Refused 28/10/2005
05/00780 1 Outline Refused 21/07/2005
06/00933 1 Full Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
1 1 1 1
4
3Market
1Affordable
4
4Unknown
Page 220

Page 221

SITE REF: M/AR/R/15/03
LOCATION: WEST END
Units Not Built
Total Units 6Capacity:
Planning Applications:
ARCHIESTOWN The Moray Council Housing Land Audit 2025
Easting: 322922 Northing: 843982
Area (Ha): 0.77
Primary School: Knockando Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 6
Supply Type: Deliverable with
Constraints
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Mrs Anne Ogg Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6
6
4Market
2Affordable
6Unknown
Page 221

Page 222

SITE REF: M/AR/R/15/04
LOCATION: SOUTH OF VIEWMOUNT
Units Not Built
Total Units 10Capacity:
Planning Applications:
ARCHIESTOWN The Moray Council Housing Land Audit 2025
Easting: 323022 Northing: 843927
Area (Ha): 1.32
Primary School: Knockando Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 10
Supply Type: Deliverable with
Constraints
LPR: 20/R4
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Mr Robert Gordon Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10
10
7Market
3Affordable
10Unknown
Page 222

Page 223

SITE REF: M/BC/R/015
LOCATION: RATHBURN (N)
Units Not Built
Total Units 60Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 343833 Northing: 866135
Area (Ha): 2.44
Primary School: Portessie Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 0
Supply Type: Constrained
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 60
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Agricultural Land
Constraint Notes: Road access
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Reidhaven Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
60
60
45Market
15Affordable
60Unknown
Page 223

Page 224

SITE REF: M/BC/R/035
LOCATION: PARKLANDS
Units Not Built
Total Units 54Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 342831 Northing: 864624
Area (Ha): 3.21
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 5
Supply Type: Deliverable
LPR: 15/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land: 2003
Owner: MPD Homes Developer: MPD Homes
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
19/00819 Full Approved 02/09/2019 Plot 33
19/00657 Full Approved 01/08/2019 Plot 30
11/01818 54 Full Approved 10/01/2012
08/00951 54 Full Approved 10/05/2010
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
1 2 2
5
54Market
5
49House
5Unknown
Page 224

Page 225

SITE REF: M/BC/R/041
LOCATION: MILLBANK GARAGE
Units Not Built
Total Units 20Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 342573 Northing: 865455
Area (Ha): 0.18
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 20
Supply Type: Deliverable
LPR: 20/OPP7
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2010 Effective Land: 2024
Owner: MPD Homes Developer: MPD Homes
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
08/01098 20 Full Approved 22/01/2009
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 5 5 4
20
20Market
20
20Flat
Page 225

Page 226

SITE REF: M/BC/R/07/07
LOCATION: RATHBURN (S)
Units Not Built
Total Units 60Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 344006 Northing: 866047
Area (Ha): 5.88
Primary School: Portessie Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 0
Supply Type: Constrained
LPR: 20/R4
Tenure:
Projected Completions:
Constrained Land 60
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Prrogramming (R5 to be substantially complete)
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Reidhaven Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
60
60
45Market
15Affordable
60Unknown
Page 226

Page 227

SITE REF: M/BC/R/07/10
LOCATION: HIGH STREET (E)
Units Not Built
Total Units 170Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 343235 Northing: 864455
Area (Ha): 11.13
Primary School: Millbank Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 0
Supply Type: Constrained
LPR: 20/R5
Tenure:
Projected Completions:
Constrained Land 200
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: J.M. Watt Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
08/00753 162 Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 190
200
150Market
50Affordable
10
200Unknown
Page 227

Page 228

SITE REF: M/BC/R/20/07
LOCATION: LAND AT MUIRTON
Units Not Built
Total Units 140Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 341370 Northing: 864453
Area (Ha): 8.02
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 140
Supply Type: Deliverable
LPR: 20/R7
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Mr Alan Durno Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
21/01963 65 Full Approved 23/06/2023 Phase 1
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20 20 20 20 20 20 20
140
102Market
38Affordable
140
4Flat
61House
75Unknown
Page 228

Page 229

SITE REF: M/BC/R/20/08
LOCATION: LAND AT BARHILL ROAD
Units Not Built
Total Units 250Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 341931 Northing: 864204
Area (Ha): 18.47
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 250
Supply Type: Deliverable
LPR: 20/R8
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Mr Michael Watt Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
21/01224 101 Full Appeal 29/09/2023 Appeal [PPA-300-
2069] upheld (Phase 1)
23/02231 95 Full Pending Phase 1 (174 units total)
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20 35 30 16 35 35 35 44
250
187Market
63Affordable
250
33Flat
68House
149Unknown
Page 229

Page 230

SITE REF: M/BC/R/20/09
LOCATION: SITE AT ARDACH HEALTH CENTRE
Units Not Built
Total Units 5Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 342444 Northing: 864944
Area (Ha): 0.38
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 0
Supply Type: Constrained
LPR: 20/R9
Tenure:
Projected Completions:
Constrained Land 5
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type:
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Moray Council Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
3Market
2Affordable
5Unknown
Page 230

Page 231

SITE REF: M/BC/R/20/LG1
LOCATION: LAND TO SOUTH WEST OF BUCKIE
Units Not Built
Total Units 250Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 342171 Northing: 863966
Area (Ha): 13.1
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 0
Supply Type: Constrained
LPR: 20/LONG1
Tenure:
Projected Completions:
Constrained Land 250
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Mr Michael Watt Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/02231 79 Full Pending Phase 1 [174 units total]
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
15 45 19 45 126
250
187Market
63Affordable
124
250Unknown
Page 231

Page 232

SITE REF: M/BC/R/20/MU
LOCATION: HIGH STREET (W)
Units Not Built
Total Units 100Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 342970 Northing: 864255
Area (Ha): 12.4
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 100
Supply Type: Deliverable
LPR: 20/MU
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 20 20 20 20 10
100
75Market
25Affordable
90
100Unknown
Page 232

Page 233

SITE REF: M/BC/R/20/W1
LOCATION: MILL OF BUCKIE
Units Not Built
Total Units 11Capacity:
Planning Applications:
BUCKIE The Moray Council Housing Land Audit 2025
Easting: 342151 Northing: 864638
Area (Ha): 1.14
Primary School: Cluny Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 11
Supply Type: Deliverable
LPR: 20/R10
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2020 Effective Land: 2020
Owner: Mr Fredrick Parkes Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
19/01127 11 Full Approved 11/02/2021
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
2 3 3 3
11
8Market
3Affordable
11
11House
Page 233

Page 234

SITE REF: M/BH/R/006
LOCATION: NORTH QUAY
Units Not Built
Total Units 14Capacity:
Planning Applications:
BURGHEAD The Moray Council Housing Land Audit 2025
Easting: 310871 Northing: 869062
Area (Ha): 0.08
Primary School: Burghead Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 14
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Derelict, vacant, backland etc.
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2001 Effective Land: 2001
Owner: Unknown (A) and Margery Bray Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
18/00359 Full Expired 05/09/2019 Renewal of 15/00221
15/00221 Full Expired 21/04/2015 Renewal of 11/00065
11/00065 6 Full Expired 29/03/2012 Site B
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 4 4
14
10Market
4Affordable
14
14Flat
Page 234

Page 235

SITE REF: M/BH/R/012
LOCATION: WEST FORESHORE
Units Not Built
Total Units 40Capacity:
Planning Applications:
BURGHEAD The Moray Council Housing Land Audit 2025
Easting: 311355 Northing: 868688
Area (Ha): 0.91
Primary School: Burghead Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 0
Supply Type: Constrained
LPR: 20/OPP1
Tenure:
Projected Completions:
Constrained Land 40
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Physical Conditions Land Use Type: Industry
Constraint Notes: Contamination and ownership
Dispute: Agreed Windfall: No
Established Land: 1998 Effective Land:
Owner: Moray Council/ToC/John Gordo Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
98/00681 40 Outline Expired 13/08/1998
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
40
40
30Market
10Affordable
40Unknown
Page 235

Page 236

SITE REF: M/BH/R/04
LOCATION: CLARKLY HILL
Units Not Built
Total Units 80Capacity:
Planning Applications:
BURGHEAD The Moray Council Housing Land Audit 2025
Easting: 312292 Northing: 868516
Area (Ha): 3.75
Primary School: Burghead Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 80
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
8 8 8 8 8 10 10 10 10
80
60Market
20Affordable
70
80Unknown
Page 236

Page 237

SITE REF: M/BH/R/20/LNG
LOCATION: LONG1 CLARKLY HILL
Units Not Built
Total Units 80Capacity:
Planning Applications:
BURGHEAD The Moray Council Housing Land Audit 2025
Easting: 312458 Northing: 868376
Area (Ha): 5.69
Primary School: Burghead Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 0
Supply Type: Constrained
LPR: 20/LONG1
Tenure:
Projected Completions:
Constrained Land 80
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
80
80
60Market
20Affordable
80Unknown
Page 237

Page 238

SITE REF: M/CR/R/001
LOCATION: EDWARD AVENUE
Units Not Built
Total Units 5Capacity:
Planning Applications:
CRAIGELLACHIE The Moray Council Housing Land Audit 2025
Easting: 329039 Northing: 844746
Area (Ha): 0.55
Primary School: Craigellachie Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 0
Supply Type: Constrained
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 5
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Physical Conditions Land Use Type: Agricultural Land
Constraint Notes: Protected water supply
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Bacardi Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
3Market
2Affordable
5Unknown
Page 238

Page 239

SITE REF: M/CR/R/003
LOCATION: BRICKFIELD
Units Not Built
Total Units 12Capacity:
Planning Applications:
CRAIGELLACHIE The Moray Council Housing Land Audit 2025
Easting: 329232 Northing: 844453
Area (Ha): 1
Primary School: Craigellachie Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 12
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2010 Effective Land: 2017
Owner: Strathdee Properties Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
16/01558 3 Full Approved 02/03/2017
16/01559 4 Full Approved 02/03/2017
08/01974 8 Full Expired 16/01/2010
08/01973 4 Full Expired 16/01/2010
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
12
12
12Market
12
7House
5Unknown
Page 239

Page 240

SITE REF: M/CR/R/004
LOCATION: FORMER BREWERY, SPEY ROAD
Units Not Built
Total Units 5Capacity:
Planning Applications:
CRAIGELLACHIE The Moray Council Housing Land Audit 2025
Easting: 329173 Northing: 844819
Area (Ha): 0.63
Primary School: Craigellachie Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 0
Supply Type: Constrained
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 5
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Ownership Land Use Type: Industry
Constraint Notes: Operational requirements
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Bacardi Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
3Market
2Affordable
5Unknown
Page 240

Page 241

SITE REF: M/CL/R/15/02
LOCATION: SEAFIELD ROAD
Units Not Built
Total Units 55Capacity:
Planning Applications:
CULLEN The Moray Council Housing Land Audit 2025
Easting: 351585 Northing: 866720
Area (Ha): 3.39
Primary School: Cullen Primary School
Secondary School: Buckie High School
Ward: Keith And Cullen
Effective Land 55
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Seafield Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20 12 12 11
55
41Market
14Affordable
55
55Unknown
Page 241

Page 242

SITE REF: M/CM/R/02
LOCATION: SEAVIEW ROAD
Units Not Built
Total Units 4Capacity:
Planning Applications:
CUMMINGSTON The Moray Council Housing Land Audit 2025
Easting: 313561 Northing: 869105
Area (Ha): 0.63
Primary School: Hopeman Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 3
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2009 Effective Land: 2009
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
21/00808 Full Approved 09/07/2021 Amended house design
(Plot 15)
20/01573 Full Approved 02/03/2021 Amended house desing
(Plots 15 and 16)
17/00627 Full Approved 07/06/2017 Amended house design
(Plot 15)
10/00573 3 Full Approved 16/07/2013
10/02077 1 Full Approved 17/03/2011
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
0 0 1 0 1 0 1
3
4Market
3
4House
Page 242

Page 243

SITE REF: M/DA/R/001
LOCATION: DALLAS SCHOOL WEST
Units Not Built
Total Units 6Capacity:
Planning Applications:
DALLAS The Moray Council Housing Land Audit 2025
Easting: 312117 Northing: 852138
Area (Ha): 1.06
Primary School: Dallas Primary School
Secondary School: Forres Academy
Ward: Speyside Glenlivet
Effective Land 0
Supply Type: Constrained
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 6
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Derelict, vacant, backland etc.
Constraint Notes: Waste water
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land:
Owner: Dallas Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
2 2 2
6
4Market
2Affordable
6
6Unknown
Page 243

Page 244

SITE REF: M/DA/R/002
LOCATION: FORMER FILLING STATION
Units Not Built
Total Units 4Capacity:
Planning Applications:
DALLAS The Moray Council Housing Land Audit 2025
Easting: 312216 Northing: 852275
Area (Ha): 0.25
Primary School: Dallas Primary School
Secondary School: Forres Academy
Ward: Speyside Glenlivet
Effective Land 0
Supply Type: Constrained
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 4
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Financial Land Use Type: Derelict, vacant, backland etc.
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Mr Ian Thomson Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
10/00323 4 Full Approved 10/05/2010
05/00354 5 Outline Approved 06/03/2007
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4
4
4Market 4House
Page 244

Page 245

SITE REF: M/DF/R/012
LOCATION: OLD MART ROAD
Units Not Built
Total Units 5Capacity:
Planning Applications:
DUFFTOWN The Moray Council Housing Land Audit 2025
Easting: 332193 Northing: 840371
Area (Ha): 0.24
Primary School: Mortlach Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 5
Supply Type: Deliverable
LPR: 20/OPP1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall:
Established Land: 2014 Effective Land: 2019
Owner: Moray Council Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
14/00320 24 Full Approved 23/06/2014 5 units approved for
this area of site
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
5
Page 245

Page 246

SITE REF: M/DF/R/15/03
LOCATION: HILLSIDE FARM
Units Not Built
Total Units 100Capacity:
Planning Applications:
DUFFTOWN The Moray Council Housing Land Audit 2025
Easting: 331836 Northing: 840087
Area (Ha): 5.57
Primary School: Mortlach Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 100
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2020
Owner: Mr James Wiseman Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20 20 20 20 20
100
75Market
25Affordable
100
100Unknown
Page 246

Page 247

SITE REF: M/DY/R/15/02
LOCATION: SOUTH DARKLASS ROAD
Units Not Built
Total Units 5Capacity:
Planning Applications:
DYKE The Moray Council Housing Land Audit 2025
Easting: 298708 Northing: 858312
Area (Ha): 0.44
Primary School: Dyke Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 0
Supply Type: Constrained
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 5
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Agricultural Land
Constraint Notes: Road infrastructure
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Mr Grant Davidson Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
3Market
2Affordable
5Unknown
Page 247

Page 248

SITE REF: M/DY/R/20/03
LOCATION: FIR PARK ROAD
Units Not Built
Total Units 3Capacity:
Planning Applications:
DYKE The Moray Council Housing Land Audit 2025
Easting: 299035 Northing: 858718
Area (Ha): 0.18
Primary School: Dyke Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 3
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Ms Ros Davidson Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
22/01315 3 Full Approved 05/05/2023
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
1 0 1 0 1
3
3Market
3
3House
Page 248

Page 249

SITE REF: M/EL/R/048
LOCATION: BILBOHALL NORTH
Units Not Built
Total Units 80Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320844 Northing: 862045
Area (Ha): 3.38
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 0
Supply Type: Constrained
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 40
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Agricultural Land
Constraint Notes: Road infrastructure
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land: 2005
Owner: Robertson Residential Group Developer: Robertson Residential Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
06/00232 Full Refused 10/08/2006 Appeal dismissed
04/00476 60 Full Approved 22/09/2005
09/01476 44 Full Withdrawn Amend condition to
increase number
19/00930 380 PAN for Bilbohall
Masterplan
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
25 15
40
75Market
5Affordable
40
60House
20Unknown
Page 249

Page 250

SITE REF: M/EL/R/07/05
LOCATION: BILBOHALL SOUTH
Units Not Built
Total Units 102Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320800 Northing: 861785
Area (Ha): 10.25
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 102
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Grampian Housing A. Developer: Grampian Housing A.
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00905 102 Full Approved 21/04/2022 Bilbohall Maspterplan
(Phase 2 - 194 units
total)
19/00930 380 PAN for Bilbohall
Masterplan
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
22 40 40
102
102Affordable
102
40Flat
62House
Page 250

Page 251

SITE REF: M/EL/R/07/06
LOCATION: SOUTH WEST OF ELGIN HIGH SCHOOL
Units Not Built
Total Units 107Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320916 Northing: 861311
Area (Ha): 14.17
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 0
Supply Type: Constrained
LPR: 20/R4
Tenure:
Projected Completions:
Constrained Land 107
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Physical Conditions Land Use Type: Agricultural Land
Constraint Notes: Topography
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Mr Dean Andersson Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
19/00930 380 PAN for Bilbohall
Masterplan
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
107
107
80Market
27Affordable
107Unknown
Page 251

Page 252

SITE REF: M/EL/R/081
LOCATION: NEWFIELD HOUSE, LOSSIEMOUTH ROAD
Units Not Built
Total Units 8Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321853 Northing: 864506
Area (Ha): 0.22
Primary School: Seafield Primary School
Secondary School: Elgin Academy
Ward: Elgin City North
Effective Land 0
Supply Type: Constrained
LPR:
Tenure:
Projected Completions:
Constrained Land 12
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Infrastucture Land Use Type: Commercial
Constraint Notes: Active travel
Dispute: Agreed Windfall: Yes
Established Land: 2011 Effective Land:
Owner: Mr Ian Aitkenhead Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
12/00652 Full Refused 20/12/2012 Vary conditions
(provision of cycleway)
12/00071 Full Refused 01/03/2012 Delete conditions
(provision of cycleway)
11/00233 4 Full Approved 26/08/2011 Permission commenced
09/02161 8 Full Approved 11/08/2010 Permission commenced
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 8
12
12Market
12
12Flat
Page 252

Page 253

SITE REF: M/EL/R/082
LOCATION: PALMERS CROSS
Units Not Built
Total Units 29Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320396 Northing: 862046
Area (Ha): 2.52
Primary School: West End Primary School
Secondary School: Elgin Academy
Ward: Elgin City South
Effective Land 0
Supply Type: Constrained
LPR: 20/R21
Tenure:
Projected Completions:
Constrained Land 20
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Ownership Land Use Type: Residential
Constraint Notes: Ownership and marketability
Dispute: Windfall: No
Established Land: 2013 Effective Land:
Owner: Edgar Road Properties Ltd Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
14/02172 Full Expired 22/12/2014 Extend 11/01882
11/01882 Full Expired 17/01/2012 Extend 06/02897
06/02897 29 Outline Approved 18/03/2009
17/01933 28 Outline Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20
20
15Market
5Affordable
20Unknown
Page 253

Page 254

SITE REF: M/EL/R/088
LOCATION: BARMUCKITY
Units Not Built
Total Units 190Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 324098 Northing: 861856
Area (Ha): 13.18
Primary School: Split
Secondary School: Split
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/R16
Tenure:
Projected Completions:
Constrained Land 190
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2017 Effective Land:
Owner: Mr Ian Robertson Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
190
190
142Market
48Affordable
180Unknown
Page 254

Page 255

SITE REF: M/EL/R/093
LOCATION: THE FIRS, BILBOHALL
Units Not Built
Total Units 8Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320694 Northing: 862025
Area (Ha): 0.41
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 8
Supply Type: Deliverable
LPR: 20/R7
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Effective 5yr+ Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2019 Effective Land: 2019
Owner: Moray Council Developer: Moray Council
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00905 8 Full Approved 21/04/2022 Blibohall Masterplan
(Phase 1 - 194 units
total)
19/00930 380 PAN for Bilbohall
Masterplan
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
8
8
8Affordable
8
8House
Page 255

Page 256

SITE REF: M/EL/R/094
LOCATION: SPYNIE HOSPITAL
Units Not Built
Total Units 50Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320704 Northing: 863952
Area (Ha): 3.8
Primary School: Bishopmill Primary School
Secondary School: Elgin Academy
Ward: Elgin City North
Effective Land 0
Supply Type: Constrained
LPR: 20/R14
Tenure:
Projected Completions:
Constrained Land 50
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Ownership Land Use Type: Derelict, vacant, backland etc.
Constraint Notes: Operational requirements
Dispute: Agreed Windfall: No
Established Land: 2019 Effective Land:
Owner: NHS Grampian Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00781 62 Full Withdrawn 08/12/2022 Affordable housing
19/01025 PAN
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 20 20
50
37Market
13Affordable
50
50Unknown
Page 256

Page 257

SITE REF: M/EL/R/15/12
LOCATION: KNOCKMASTING WOOD
Units Not Built
Total Units 85Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320541 Northing: 861909
Area (Ha): 4.28
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 85
Supply Type: Deliverable
LPR: 20/R6
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Scotia Homes Developer: Scotia Homes
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
15/01330 1 Full Refused 29/09/2015 Refused by LRB in 2016
05/00758 80 Full Withdrawn
19/00930 380 Full PAN for Bilbohall
Masterplan
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5 30 50
85
63Market
22Affordable
35
85Unknown
Page 257

Page 258

SITE REF: M/EL/R/15/13
LOCATION: HAMILTON DRIVE
Units Not Built
Total Units 18Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320812 Northing: 863708
Area (Ha): 1.18
Primary School: Bishopmill Primary School
Secondary School: Elgin Academy
Ward: Elgin City North
Effective Land 10
Supply Type: Deliverable
LPR: 20/R9
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Derelict, vacant, backland etc.
Constraint Notes:
Dispute: Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Developer: MPD Homes
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/00649 1 Full Approved 24/08/2023
22/01221 Full Approved 23/11/2022 Vary house type (Plot 6)
19/01614 17 Full Approved 30/09/2021
19/00386 17 Full Withdrawn 09/10/2019
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
0 2 2 2 2 2
10
14Market
4Affordable
10
4Flat
14House
Page 258

Page 259

SITE REF: M/EL/R/15/14
LOCATION: LESMURDIE FIELDS
Units Not Built
Total Units 70Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 322746 Northing: 863777
Area (Ha): 6.07
Primary School: Seafield Primary School
Secondary School: Elgin Academy
Ward: Split
Effective Land 70
Supply Type: Deliverable
LPR: 20/R13
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Robertson Residential Group Developer: Robertson Residential Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
19/01510 70 Full Approved 16/11/2022
18/00978 90 PAN
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 25 25 10
70
48Market
22Affordable
70
8Flat
62House
Page 259

Page 260

SITE REF: M/EL/R/15/LNE
LOCATION: LONG1 A/B NORTH EAST
Units Not Built
Total Units 1800Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 322626 Northing: 864410
Area (Ha): 88.71
Primary School: Seafield Primary School
Secondary School: Elgin Academy
Ward: Split
Effective Land 0
Supply Type: Constrained
LPR: 20/LONG1
Tenure:
Projected Completions:
Constrained Land 1800
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Pitgaveny Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
1800
1800
1350Market
450Affordable
1800Unknown
Page 260

Page 261

SITE REF: M/EL/R/20/02
LOCATION: EDGAR ROAD
Units Not Built
Total Units 106Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320936 Northing: 861606
Area (Ha): 5.42
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 106
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Derelict, vacant, backland etc.
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Moray Council Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00905 84 Full Approved 21/04/2022 Bilbohall Masterplan
(Phase 1 - 194 units
total)
15/00607 Full Approved 24/06/2015 Deposit of excated
material
19/00930 380 PAN for Bilbohall
Masterplan
24/00705 106 Full Approved Phase 1 revised layout
(increase of 22 units) -
approved subject to S75
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
28 47 31
106
106Affordable
106
46Flat
60House
Page 261

Page 262

SITE REF: M/EL/R/20/05
LOCATION: BILBOHALL WEST
Units Not Built
Total Units 50Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320688 Northing: 861340
Area (Ha): 4.39
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 0
Supply Type: Constrained
LPR: 20/R5
Tenure:
Projected Completions:
Constrained Land 50
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Mr Dean Anderson Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
50
50
37Market
13Affordable
50Unknown
Page 262

Page 263

SITE REF: M/EL/R/20/12
LOCATION: FINDRASSIE (R12 PARCEL)
Units Not Built
Total Units 150Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321674 Northing: 865510
Area (Ha): 16.95
Primary School: Seafield Primary School
Secondary School: Elgin Academy
Ward: Heldon And Laich
Effective Land 0
Supply Type: Constrained
LPR: 20/R12
Tenure:
Projected Completions:
Constrained Land 150
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Pitgaveny Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
150
150
112Market
38Affordable
150Unknown
Page 263

Page 264

SITE REF: M/EL/R/20/19
LOCATION: EASTER LINKWOOD AND LINKWOOD
Units Not Built
Total Units 675Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 323677 Northing: 861106
Area (Ha): 48.38
Primary School: Linkwood Primary School
Secondary School: Split
Ward: Fochabers Lhanbryde
Effective Land 609
Supply Type: Deliverable with
Constraints
LPR: 20/R19
Tenure:
Projected Completions:
Constrained Land
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2018 Effective Land:
Owner: Mr Ian Robertson Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00316 Full Approved 16/09/2020 Variation of house types
18/01209 645 Full Approved 16/05/2019 Variation of phasing
[Phases 1A,  B + C]
16/01244 Full Approved 10/05/2018 Elgin South Masterplan
[Phase 1 - 870 units
total]
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
45 45 70 70 70 45 45 219
609
497Market
178Affordable
390
29Flat
37House
609Unknown
Page 264

Page 265

SITE REF: M/EL/R/20/20
LOCATION: GLASSGREEN, ELGIN SOUTH
Units Not Built
Total Units 197Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321896 Northing: 860463
Area (Ha): 17.59
Primary School: Greenwards Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 6
Supply Type: Deliverable
LPR: 20/R20
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2018 Effective Land: 2019
Owner: Springfield Properties Plc Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
21/01163 10 Full Approved 21/07/2023 Phase 2 (10 units)
21/00206 Full Approved 13/01/2023 Variation to phasing
and layout (increase in
units [5])
21/00304 Full Approved 13/01/2023 Variation to layout
(reduction in units [1])
21/00396 187 Full Approved 13/01/2023 Plot substitution
(reduction in units [12])
19/01641 Full Approved 08/04/2020 Variation to house types
18/01209 195 Full Approved 16/05/2019 Variation to phasing
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 6
6
132Market
65Affordable
6
58Flat
139House
Page 265

Page 266

SITE REF: M/EL/R/20/L2
LOCATION: ELGIN SOUTH LONG2
Units Not Built
Total Units 1000Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 322892 Northing: 860523
Area (Ha): 69.3
Primary School: Split
Secondary School: Split
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/LNG2
Tenure:
Projected Completions:
Constrained Land 1000
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
1000
1000
750Market
250Affordable
1000Unknown
Page 266

Page 267

SITE REF: M/EL/R/21/L2
LOCATION: ELGIN SOUTH (GRASSGREEN, BURNSIDE
& CEMETERY)
Units Not Built
Total Units 627Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 323286 Northing: 860599
Area (Ha): 41.8
Primary School: Split
Secondary School: Elgin High School
Ward: Split
Effective Land 584
Supply Type: Deliverable
LPR: 20/LONG2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2021
Owner: Springfield Properties Plc Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/00866 176 Full Approved 31/03/2025 Variation of house
types (Phase 2 - private
to care (reduction of 10
units]
21/01163 186 Full Approved 21/07/2023 Glassgreen Village
(Phase 2)
20/01731 Full Withdrawn North Burnside
23/01440 Full Pending Variation of house
types (Phase 2 -
reduction in units [14])
24/01437 204 Full Pending Phase 3
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
43 68 54 40 68 54 41 259
584
470Market
157Affordable
325
45Flat
117House
465Unknown
Page 267

Page 268

SITE REF: M/EL/R/23/01
LOCATION: BAIN AVENUE
Units Not Built
Total Units 24Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 323505 Northing: 861804
Area (Ha): 2.11
Primary School: Linkwood Primary School
Secondary School: Elgin High School
Ward: Elgin City South
Effective Land 24
Supply Type: Deliverable
LPR: 20/ENV2+3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type:
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2020 Effective Land: 2022
Owner: Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
21/01863 24 Full Approved 23/05/2022 Variation to house types
(reduction in units (2))
19/00547 26 Full Appeal 23/03/2020 Appeal (PPA-300-
2056) upheld
19/00547 26 Full Refused 09/10/2019
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
24
24
24Affordable
24
8Flat
16House
Page 268

Page 269

SITE REF: M/EL/R/23/02
LOCATION: FINDRASSIE (E PARCEL)
Units Not Built
Total Units 419Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321601 Northing: 864744
Area (Ha): 15.54
Primary School: Seafield Primary School
Secondary School: Elgin Academy
Ward: Heldon And Laich
Effective Land 173
Supply Type: Deliverable
LPR: 20/R11
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2019
Owner: Barratt Homes Developer: Barratt Homes/David Wilson Hom
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/02239 148 Full Approved 23/10/2024 AMC (17/00834 and
19/01085) [Phases
E3/4]
23/01167 Full Approved 30/11/2023 Variation of house types
22/01385 158 Full Approved 08/02/2023 Variation of house type
(increase in units (2))
[Phase E2]
21/00961 156 Full Approved 13/04/2022 AMC (17/00834 and
19/01085) [Phase E2]
20/00753 113 Full Approved 27/01/2021 AMC (17/00834 and
19/01085) [Phase E1]
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
81 67 55 47 4
173
313Market
106Affordable
173
36Flat
383House
Page 269

Page 270

SITE REF: M/EL/R/23/03
LOCATION: FINDRASSIE (D PARCEL)
Units Not Built
Total Units 266Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320451 Northing: 864268
Area (Ha): 11.32
Primary School: Bishopmill Primary School
Secondary School: Elgin Academy
Ward: Elgin City North
Effective Land 266
Supply Type: Deliverable
LPR: 20/R11
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2015
Owner: Pitgaveny Estate Developer: Robertson Residential Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/01071 268 Full Pending
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
15 30 30 30 30 30 101
266
199Market
67Affordable
165
266Unknown
Page 270

Page 271

SITE REF: M/EL/R/23/04
LOCATION: FINDRASSIE (W PARCEL)
Units Not Built
Total Units 260Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320890 Northing: 864851
Area (Ha): 12.12
Primary School: Bishopmill Primary School
Secondary School: Elgin Academy
Ward: Split
Effective Land 0
Supply Type: Constrained
LPR: 20/R11
Tenure:
Projected Completions:
Constrained Land 260
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Pitgaveny Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20 40 40 160
260
195Market
65Affordable
100
260Unknown
Page 271

Page 272

SITE REF: M/EL/R/23/05
LOCATION: FINDRASSIE (N PARCEL)
Units Not Built
Total Units 519Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321225 Northing: 865218
Area (Ha): 31.91
Primary School: Seafield Primary School
Secondary School: Elgin Academy
Ward: Heldon And Laich
Effective Land 0
Supply Type: Constrained
LPR: 20/R11
Tenure:
Projected Completions:
Constrained Land 519
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Pitgaveny Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
519
519
389Market
130Affordable
519Unknown
Page 272

Page 273

SITE REF: M/EL/R/23/W1
LOCATION: OLDMILLS ROAD
Units Not Built
Total Units 12Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 320761 Northing: 862735
Area (Ha): 0.42
Primary School: West End Primary School
Secondary School: Elgin Academy
Ward: Elgin City South
Effective Land 12
Supply Type: Deliverable
LPR: 20/ENV6
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Derelict, vacant, backland etc.
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2023 Effective Land: 2023
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00795 12 Full Approved 28/04/2023
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 6
12
12Market
12
12Flat
Page 273

Page 274

SITE REF: M/EL/R/25/01
LOCATION: SOUTH STREET
Units Not Built
Total Units 38Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321559 Northing: 862760
Area (Ha): 0.3
Primary School: West End Primary School
Secondary School: Elgin Academy
Ward: Elgin City South
Effective Land 38
Supply Type: Deliverable
LPR:
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2018 Effective Land: 2018
Owner: Moray Council/Robertson Grou Developer: Moray Council/Robertson Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/00300 38 Full Approved 30/05/2024
17/00963 Full Approved 01/03/2018 CoU nightclub to 14
serviced apartments
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
19 19
38
38Affordable
38
38Flat
Page 274

Page 275

SITE REF: M/EL/R/TC/01
LOCATION: 161-163 HIGH STREET (POUNDLAND)
Units Not Built
Total Units 21Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321480 Northing: 862875
Area (Ha): 0.14
Primary School: West End Primary School
Secondary School: Elgin Academy
Ward: Elgin City South
Effective Land 21
Supply Type: Deliverable
LPR: 20/TC
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2020 Effective Land: 2020
Owner: Poundland Elgin Ltd Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00891 21 Full Approved 15/10/2020
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 7 7 7
21
6Market
15Affordable
21
21Flat
Page 275

Page 276

SITE REF: M/EL/R/TC/04
LOCATION: 42 BATCHEN STREET
Units Not Built
Total Units 4Capacity:
Planning Applications:
ELGIN The Moray Council Housing Land Audit 2025
Easting: 321535 Northing: 862727
Area (Ha): 0.02
Primary School: West End Primary School
Secondary School: Elgin Academy
Ward: Elgin City South
Effective Land 4
Supply Type: Deliverable
LPR: 20/TC
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2021 Effective Land: 2021
Owner: Mr Richard Ham Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00282 4 Full Approved 11/09/2020 Coversion of shop
storage to 4 x flats
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4
4
4Market
4
4Flat
Page 276

Page 277

SITE REF: M/FH/R/009
LOCATION: HEATHNEUK
Units Not Built
Total Units 6Capacity:
Planning Applications:
FINDHORN The Moray Council Housing Land Audit 2025
Easting: 304580 Northing: 863950
Area (Ha): 0.9
Primary School: Kinloss Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 2
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type:
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Mr Tim Clark Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
18/01518 Full Approved 29/01/2019 Plot 2a
18/00429 Full Approved 04/05/2018 Plot 2a - Change of use
(garage) to self-catering
rental unit
17/00333 1 Full Approved 10/05/2017 Sub division of Plot 1
14/00869 5 Full Approved 07/07/2014 Sites marketed and sold
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
0 0 1 0 1
2
6Market
2
6House
Page 277

Page 278

SITE REF: M/FH/R/11
LOCATION: NORTH WHINS
Units Not Built
Total Units 38Capacity:
Planning Applications:
FINDHORN The Moray Council Housing Land Audit 2025
Easting: 304945 Northing: 863894
Area (Ha): 2.68
Primary School: Kinloss Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 20
Supply Type: Deliverable
LPR:
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type:
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2019 Effective Land: 2020
Owner: Developer: Duneland Ltd
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/01222 9 Approved 12/08/2021 AMC of 19/00320/PPP
[Plot 14]
20/00135 8 Approved 24/09/2020 AMC of 19/00320/PPP
[Plot 13.2]
19/01649 8 Approved 23/09/2020 AMC of 19/00320/PPP
20/00016 Full Approved 13/08/2020 Amend condition re
max. ridge height
19/01436 Full Withdrawn 14/01/2020 Amend condition re
max. ridge height
19/00320 38 Outline Approved 04/11/2019
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
9 9 9 2
20
28Market
10Affordable
20
38House
Page 278

Page 279

SITE REF: M/FH/R/20/RC
LOCATION: RESIDENTIAL CARAVANS
Units Not Built
Total Units 9Capacity:
Planning Applications:
FINDHORN The Moray Council Housing Land Audit 2025
Easting: 305094 Northing: 863641
Area (Ha): 7.85
Primary School: Kinloss Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 1
Supply Type: Deliverable
LPR: 20/RC
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Residential
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2019 Effective Land: 2019
Owner: Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
19/00043 8 Full Approved 23/07/2020
19/00042 1 Full Approved 19/03/2019
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
0 0 1
1
1Market
8Affordable
1
8Flat
1House
Page 279

Page 280

SITE REF: M/FN/R/009
LOCATION: MORVEN CRESCENT
Units Not Built
Total Units 60Capacity:
Planning Applications:
FINDOCHTY The Moray Council Housing Land Audit 2025
Easting: 346362 Northing: 867677
Area (Ha): 2.82
Primary School: Findochty Primary School
Secondary School: Buckie High School
Ward: Buckie
Effective Land 60
Supply Type: Deliverable with
Constraints
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land:
Owner: Seafield Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
10/00419 19/03/2010 SCN for residential
development
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
12 16 16 16
60
45Market
15Affordable
60
60Unknown
Page 280

Page 281

SITE REF: M/FO/R/07/01
LOCATION: ORDIQUISH ROAD
Units Not Built
Total Units 49Capacity:
Planning Applications:
FOCHABERS The Moray Council Housing Land Audit 2025
Easting: 334366 Northing: 858016
Area (Ha): 2.62
Primary School: Milne's Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 40
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2015
Owner: Bob Milton Properties Developer: Bob Milton Properties
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/01866 Full Approved 26/03/2024 Variation of house
types [Plots 13-19]
22/00385 Full Approved 05/07/2022 Variation of house
types [Plots 4-7]
21/01487 Full Approved 09/12/2021 Amend house design
[Plot 8]
21/00933 Full Approved 19/08/2021 Variation of house type
[Plot 3]
15/00244 49 Full Approved 26/11/2015
12/01577 50 Outline Approved 10/02/2014
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
2 5 8 8 8 8 3
40
37Market
12Affordable
40
49House
Page 281

Page 282

SITE REF: M/FO/R/07/02
LOCATION: ORDIQUISH ROAD WEST
Units Not Built
Total Units 50Capacity:
Planning Applications:
FOCHABERS The Moray Council Housing Land Audit 2025
Easting: 334242 Northing: 858100
Area (Ha): 2.32
Primary School: Milne's Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 50
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2008 Effective Land: 2015
Owner: Bob Milton Properties Developer: Bob Milton Properties
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
8 10 10 10 12
50
37Market
13Affordable
38
50Unknown
Page 282

Page 283

SITE REF: M/FO/R/15/LG
LOCATION: ORDIQUISH ROAD EAST LONG
Units Not Built
Total Units 35Capacity:
Planning Applications:
FOCHABERS The Moray Council Housing Land Audit 2025
Easting: 334612 Northing: 857859
Area (Ha): 1.85
Primary School: Milne's Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/LONG
Tenure:
Projected Completions:
Constrained Land 35
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Crown Estate Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
35
35
26Market
9Affordable
35Unknown
Page 283

Page 284

SITE REF: M/FO/R/20/04
LOCATION: ORDIQUISH ROAD EAST
Units Not Built
Total Units 50Capacity:
Planning Applications:
FOCHABERS The Moray Council Housing Land Audit 2025
Easting: 334498 Northing: 857930
Area (Ha): 2.5
Primary School: Milne's Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 50
Supply Type: Deliverable with
Constraints
LPR: 20/R4
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Crown Estate Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
50
50
37Market
13Affordable
50Unknown
Page 284

Page 285

SITE REF: M/FR/R/057
LOCATION: AUCTION MART, TYTLER STREET
Units Not Built
Total Units 24Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 303070 Northing: 858830
Area (Ha): 0.2
Primary School: Pilmuir Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 0
Supply Type: Constrained
LPR: 20/OPP4
Tenure:
Projected Completions:
Constrained Land 24
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Financial Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2011 Effective Land: 2011
Owner: Developer: Cairn Housing Associaion
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
13/00347 24 Full Approved 25/09/2013 Extend 08/01954
08/01954 24 Full Approved 21/05/2010
15/00371 Full Listed Building Consent
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
12 12
24
24Affordable
24
24Flat
Page 285

Page 286

SITE REF: M/FR/R/060
LOCATION: CAROLINE STREET
Units Not Built
Total Units 48Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 303505 Northing: 859113
Area (Ha): 1.51
Primary School: Anderson's Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 48
Supply Type: Deliverable with
Constraints
LPR: 20/OPP1
Tenure:
Projected Completions:
Constrained Land
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Physical Conditions Land Use Type: Commercial
Constraint Notes: Contamination
Dispute: Agreed Windfall: No
Established Land: 2019 Effective Land:
Owner: AES Solar Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/01455 48 Full Appeal 18/10/2022 Appeal (PPA-300-
2065) upheld
20/01455 48 Full Refused 25/08/2021
16/00740 80 PAN for affordable units
development
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
24 24
48
48Affordable
48
19Flat
29House
Page 286

Page 287

SITE REF: M/FR/R/07/03
LOCATION: FERRYLEA
Units Not Built
Total Units 572Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 303116 Northing: 857233
Area (Ha): 33.53
Primary School: Split
Secondary School: Forres Academy
Ward: Forres
Effective Land 79
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2012
Owner: Springfield Properties Plc Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/00583 318 Full Approved 05/06/2023 Remix of house
typres/plots (reduction
in units [3])
22/01332 Full Approved 30/05/2023 Variation of house types
21/00941 Full Approved 05/04/2023 Variation of house types
21/01217 325 Full Approved 04/04/2023 Remix of house
types/plots (increase in
units [3])
21/01350 332 Full Approved 04/04/2023 Remix of house
types/plots (increase in
units [7])
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
75 40 39
79
405Market
167Affordable
79
124Flat
448House
Page 287

Page 288

SITE REF: M/FR/R/07/08
LOCATION: MANNACHIE
Units Not Built
Total Units 40Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 303514 Northing: 857451
Area (Ha): 2.85
Primary School: Applegrove Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 40
Supply Type: Deliverable with
Constraints
LPR: 20/R4
Tenure:
Projected Completions:
Constrained Land
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Physical Conditions Land Use Type: Woodlands
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00927 32 Full Refused 06/02/2023 Phase 1
20/01028 8 Outline Refused 06/02/2023 Phase 2 (Apartment
Block)
23/02096 32 Full Pending Phase 1
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 6 6 6 6 10
40
30Market
10Affordable
40
40Unknown
Page 288

Page 289

SITE REF: M/FR/R/07/11
LOCATION: LOCHYHILL LONG1
Units Not Built
Total Units 400Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 305989 Northing: 858888
Area (Ha): 16.73
Primary School: Anderson's Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 0
Supply Type: Constrained
LPR: 20/LONG1
Tenure:
Projected Completions:
Constrained Land 400
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: White Family Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
400
400
300Market
100Affordable
400Unknown
Page 289

Page 290

SITE REF: M/FR/R/15/08
LOCATION: BALNAGEITH
Units Not Built
Total Units 12Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 302147 Northing: 857332
Area (Ha): 1.17
Primary School: Pilmuir Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 0
Supply Type: Constrained
LPR: 20/R5
Tenure:
Projected Completions:
Constrained Land 12
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
3 3 3 3
12
9Market
3Affordable
12
12Unknown
Page 290

Page 291

SITE REF: M/FR/R/15/10
LOCATION: DALLAS DHU
Units Not Built
Total Units 136Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 303562 Northing: 857092
Area (Ha): 11.8
Primary School: Applegrove Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 136
Supply Type: Deliverable
LPR: 20/R6
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Altyre Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
Dallas Dhu Masterplan
24/01087 34 Full Pending Phase 1
25/00279 5 Full Pending
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
18 24 24 24 24 22
136
102Market
34Affordable
136
8Flat
31House
97Unknown
Page 291

Page 292

SITE REF: M/FR/R/15/11
LOCATION: PILMUIR ROAD WEST
Units Not Built
Total Units 40Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 302493 Northing: 857809
Area (Ha): 2.28
Primary School: Pilmuir Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 0
Supply Type: Constrained
LPR: 20/R7
Tenure:
Projected Completions:
Constrained Land 40
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Physical Conditions Land Use Type: Derelict, vacant, backland etc.
Constraint Notes: Contamination and ownership
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: G & AG Proctor Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
40
40
30Market
10Affordable
40Unknown
Page 292

Page 293

SITE REF: M/FR/R/23/01
LOCATION: LOCHYHILL (AREA A)
Units Not Built
Total Units 260Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 305445 Northing: 859534
Area (Ha): 11.94
Primary School: Anderson's Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 260
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2015
Owner: White Family Developer: Robertson Residential Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
09/02364 229 Full Expired 02/07/2015
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
30 30 30 30 30 30 30 50
260
195Market
65Affordable
210
260Unknown
Page 293

Page 294

SITE REF: M/FR/R/23/02
LOCATION: LOCHYHILL (AREA B)
Units Not Built
Total Units 500Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 305701 Northing: 859268
Area (Ha): 33.53
Primary School: Anderson's Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 500
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2015
Owner: White Family Developer: Robertson Residential Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 490
500
375Market
125Affordable
10
500Unknown
Page 294

Page 295

SITE REF: M/FR/R/23/03
LOCATION: LOCHYHILL (AREA C)
Units Not Built
Total Units 90Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 306028 Northing: 859667
Area (Ha): 15.64
Primary School: Anderson's Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 0
Supply Type: Constrained
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 90
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: White Family Developer: Robertson Residential Group
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
90
90
67Market
23Affordable
90Unknown
Page 295

Page 296

SITE REF: M/FR/R/24/W1
LOCATION: CHAPELTON FARM
Units Not Built
Total Units 4Capacity:
Planning Applications:
FORRES The Moray Council Housing Land Audit 2025
Easting: 304795 Northing: 858006
Area (Ha): 0.92
Primary School: Applegrove Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 4
Supply Type: Deliverable
LPR:
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Agricultural Building
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2013 Effective Land: 2024
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
12/01867 Outline Approved 08/11/2013 Plot 3
12/01868 Outline Approved 02/08/2013 Plot 4
09/01010 1 Full Approved 19/04/2010 Plot 2
09/00980 1 Full Approved 11/03/2010 Plot 1
25/00303 2 Full Pending Plots 3 & 4
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
1 1 1 1
4
4Market
4
4House
Page 296

Page 297

SITE REF: M/GM/R/15/01
LOCATION: SOUTH OF INNES ROAD
Units Not Built
Total Units 10Capacity:
Planning Applications:
GARMOUTH/KINGSTON The Moray Council Housing Land Audit 2025
Easting: 333732 Northing: 864503
Area (Ha): 0.67
Primary School: Mosstodloch Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 10
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Agricultural Land
Constraint Notes: Infrastrucutre and ownership
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
2 2 2 2 2
10
7Market
3Affordable
8
10Unknown
Page 297

Page 298

SITE REF: M/HP/R/15/R1
LOCATION: MANSE ROAD
Units Not Built
Total Units 75Capacity:
Planning Applications:
HOPEMAN The Moray Council Housing Land Audit 2025
Easting: 314186 Northing: 869354
Area (Ha): 4.67
Primary School: Hopeman Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 69
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/01356 1 Full Approved 24/12/2024 Variation of house type
(increase of 1 unit)
[Phase 1]
20/00278 48 Full Approved 31/03/2022 Phase 1
19/00783 75 PAN for residential
development and
nursing/retirement home
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 10 16 8 8 8 8 8 3
69
56Market
19Affordable
69
14Flat
34House
27Unknown
Page 298

Page 299

SITE REF: M/KH/R/015
LOCATION: DUNNYDUFF ROAD
Units Not Built
Total Units 40Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343505 Northing: 850034
Area (Ha): 3.22
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 0
Supply Type: Constrained
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 36
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Ownership and marketability
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land: 2003
Owner: Various Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
15/00841 1 Outline Refused 01/07/2015
07/01549 21 Full Approved 22/02/2008 1 x Full, 20 x Outline
05/01000 6 Outline Refused 26/05/2006
03/00298 6 Outline Refused 13/11/2003
INDIVIDS 3 Full Approved
97/02052 1 Full Approved
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 6 6 6 12
36
30Market
10Affordable
24
4House
36Unknown
Page 299

Page 300

SITE REF: M/KH/R/030
LOCATION: BALLOCH ROAD
Units Not Built
Total Units 6Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343375 Northing: 850030
Area (Ha): 0.26
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 6
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Residential
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: Effective Land:
Owner: Mr and Mrs N. Howie Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
04/02978 7 Full Withdrawn
22/00939 3 Full Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6
6
4Market
2Affordable
6
6Unknown
Page 300

Page 301

SITE REF: M/KH/R/07/08
LOCATION: BANFF ROAD NORTH
Units Not Built
Total Units 122Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343562 Northing: 851304
Area (Ha): 8.52
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 58
Supply Type: Deliverable
LPR: 20/R4
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2013
Owner: Moray Council Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
18/01497 122 Full Approved 15/07/2019
17/00009 90 Full Approved 15/09/2017 Amend 10/01492
10/01492 76 Full Approved 19/09/2013
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
26 16 16
58
122Affordable
58
40Flat
82House
Page 301

Page 302

SITE REF: M/KH/R/07/15
LOCATION: EDINDIACH ROAD (EAST)
Units Not Built
Total Units 40Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343940 Northing: 849868
Area (Ha): 5.13
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 0
Supply Type: Constrained
LPR: 20/R8
Tenure:
Projected Completions:
Constrained Land 40
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Agricultural Land
Constraint Notes: Utilities and marketability
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
40
40
30Market
10Affordable
40Unknown
Page 302

Page 303

SITE REF: M/KH/R/15/036
LOCATION: NEWMILL SOUTH ROAD
Units Not Built
Total Units 7Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343047 Northing: 851430
Area (Ha): 0.85
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 12
Supply Type: Deliverable with
Constraints
LPR: 20/OPP3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Outline
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Financial Land Use Type: Commercial
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2016 Effective Land:
Owner: ACE Roofing (Keith) Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
15/00998 7 Outline Approved 31/07/2015
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
6 6
12
9Market
3Affordable
12
12Unknown
Page 303

Page 304

SITE REF: M/KH/R/20/08
LOCATION: DENWELL ROAD
Units Not Built
Total Units 5Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343477 Northing: 849731
Area (Ha): 1.67
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 0
Supply Type: Constrained
LPR: 20/R7
Tenure:
Projected Completions:
Constrained Land 5
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Physical Conditions Land Use Type: Agricultural Land
Constraint Notes: Flood risk
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
3Market
2Affordable
5Unknown
Page 304

Page 305

SITE REF: M/KH/R/20/LG1
LOCATION: NURSERY FIELD LONG1
Units Not Built
Total Units 70Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343114 Northing: 849706
Area (Ha): 2.55
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 70
Supply Type: Deliverable
LPR: 20/LONG1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes: LONG released in 2023
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2023
Owner: Moray Council Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 4 4 58
70
52Market
18Affordable
12
70Unknown
Page 305

Page 306

SITE REF: M/KH/R/20/MU
LOCATION: BANFF ROAD SOUTH
Units Not Built
Total Units 50Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343860 Northing: 850947
Area (Ha): 16.7
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 50
Supply Type: Deliverable
LPR: 20/MU
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 20 20
50
37Market
13Affordable
50
50Unknown
Page 306

Page 307

SITE REF: M/KH/R/TC/02
LOCATION: 138-140 MID STREET
Units Not Built
Total Units 4Capacity:
Planning Applications:
KEITH The Moray Council Housing Land Audit 2025
Easting: 343198 Northing: 850508
Area (Ha): 0.07
Primary School: Keith Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 4
Supply Type: Deliverable
LPR:
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2019 Effective Land: 2019
Owner: Mr Barry Fettes Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00161 4 Full Approved 14/10/2020
19/00750 Full Approved 06/08/2019 Inc. retail
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4
4
4Market
4
4Flat
Page 307

Page 308

SITE REF: M/KN/R/003
LOCATION: WEST OF SEAPARK HOUSE
Units Not Built
Total Units 6Capacity:
Planning Applications:
KINLOSS The Moray Council Housing Land Audit 2025
Easting: 306068 Northing: 861557
Area (Ha): 1.61
Primary School: Kinloss Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 6
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Woodlands
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2017
Owner: Seapark Estate Ltd Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
21/01836 Full Approved 18/08/2023 Residential and storage
caravans during
construction [Plot 1]
23/00463 Full Approved 18/08/2023 Plot 5
22/00158 Full Approved 17/08/2023 Plots 3+6
22/00421 Full Approved 16/08/2023 Plot 2
23/00462 Full Approved 16/08/2023 Plot 4
17/00780 Full Approved 05/12/2017 Plot 1
15/01605 6 Outline Approved 03/08/2007
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
2 0 2 0 2
6
6Market
6
6House
Page 308

Page 309

SITE REF: M/KN/R/009
LOCATION: FINDHORN ROAD WEST
Units Not Built
Total Units 6Capacity:
Planning Applications:
KINLOSS The Moray Council Housing Land Audit 2025
Easting: 306150 Northing: 861832
Area (Ha): 0.6
Primary School: Kinloss Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 1
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type:
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2013 Effective Land: 2019
Owner: MPD Homes Developer: MPD Homes
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
22/00389 Full Approved 22/07/2022 Rotation of house
position (Plot 1)
20/01335 Full Approved 30/03/2021 Rotation of house
position (Plot 6)
17/01906 6 Full Approved 07/06/2019
10/01588 6 Full Approved 01/03/2013
07/02082 Full Refused
16/00286 6 Full Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
0 1
1
6Market
1
6House
Page 309

Page 310

SITE REF: M/KN/R/07/04
LOCATION: DAMHEAD
Units Not Built
Total Units 23Capacity:
Planning Applications:
KINLOSS The Moray Council Housing Land Audit 2025
Easting: 308098 Northing: 862481
Area (Ha): 3.38
Primary School: Kinloss Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 23
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Outline
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Woodlands
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2020
Owner: The Rhind 2008 Discretionary T Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/01408 Full Approved 26/02/2025 Deletion of condition
(17 - RCC)
19/00260 23 Outline Approved 15/12/2020
18/00346 19 Outline Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
3 3 3 3 3 3 3 2
23
23Market
23
23House
Page 310

Page 311

SITE REF: M/LH/R/07/01
LOCATION: WEST OF ST ANDREWS ROAD
Units Not Built
Total Units 77Capacity:
Planning Applications:
LHANBRYDE The Moray Council Housing Land Audit 2025
Easting: 326794 Northing: 861219
Area (Ha): 6.92
Primary School: Lhanbryde Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 77
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2021
Owner: Springfield Properties Plc Developer: Springfield Properties Plc
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
23/02157 Full Approved 26/07/2024 Variation of codition
[19 - footpath]
19/01080 77 Full Approved 14/04/2021
18/01190 PAN
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20 30 27
77
58Market
19Affordable
77
8Flat
69House
Page 311

Page 312

SITE REF: M/LH/R/20/02
LOCATION: GARMOUTH ROAD
Units Not Built
Total Units 24Capacity:
Planning Applications:
LHANBRYDE The Moray Council Housing Land Audit 2025
Easting: 327858 Northing: 861687
Area (Ha): 1.69
Primary School: Lhanbryde Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 24
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Moray Council Developer: Grampian Housing Association
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
22/00863 Full Approved 26/08/2022 Variation of roof forms
and windows
20/01615 24 Full Approved 04/04/2022 Dev includes 8
specialist care units
and staff block
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
12 0 12
24
24Affordable
24
8Flat
16House
Page 312

Page 313

SITE REF: M/LS/R/023
LOCATION: INCHBROOM
Units Not Built
Total Units 83Capacity:
Planning Applications:
LOSSIEMOUTH The Moray Council Housing Land Audit 2025
Easting: 323497 Northing: 869622
Area (Ha): 7.31
Primary School: St. Gerardine Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 17
Supply Type: Deliverable
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Woodlands
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land: 2003
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/01596 Full Approved 19/12/2024 Variation to house type
(Plot 42)
23/00983 83 Full Approved 21/06/2024 Variation to layout
(Phase 2B - increase in
units [8])
19/01178 75 Full Approved 06/11/2020 Variation to layout and
house types (increase
in units (4))
20/00265 Full Approved 04/11/2020 Variation of conditions
(Upgrade of junction)
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 6 6 5
17
63Market
20Affordable
17
24Flat
59House
Page 313

Page 314

SITE REF: M/LS/R/039
LOCATION: WEST BASIN, LOSSIEMOUTH MARINA
Units Not Built
Total Units 30Capacity:
Planning Applications:
LOSSIEMOUTH The Moray Council Housing Land Audit 2025
Easting: 323711 Northing: 871205
Area (Ha): 0.35
Primary School: St. Gerardine Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 21
Supply Type: Deliverable
LPR:
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Land Use Type: Commercial
Constraint Notes:
Dispute: Agreed Windfall: Yes
Established Land: 2005 Effective Land: 2008
Owner: Developer: Oakbank Homes
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
17/01802 Full Approved 15/02/2018 Amendment to remove
concrete bollards
13/01640 30 Full Approved 05/08/2014
07/02022 21 Full Approved 28/07/2008
04/00974 20 Outline Approved 24/10/2005
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5 5 11
21
30Market
10
30Flat
Page 314

Page 315

SITE REF: M/LS/R/07/01
LOCATION: SUNBANK/KINNEDDAR
Units Not Built
Total Units 278Capacity:
Planning Applications:
LOSSIEMOUTH The Moray Council Housing Land Audit 2025
Easting: 322631 Northing: 869449
Area (Ha): 14.49
Primary School: Hythehill Primary School
Secondary School: Lossiemouth High School
Ward: Heldon And Laich
Effective Land 185
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail/Under Construction
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2017
Owner: Tulloch of Cummingston Developer: Tulloch of Cummingston
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
22/00161 275 Full Approved 07/02/2023 Variation to layout
(increase in units (10))
19/00100 265 Full Approved 12/06/2020 Variation to phasing
and layout (increase in
units [4])
17/01076 Full Withdrawn 12/12/2018 Variation to phasing
14/01486 261 Full Approved 11/04/2017
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
14 12 12 12 12 12 12 12 12 12 12 65
185
208Market
70Affordable
120
95Flat
183House
Page 315

Page 316

SITE REF: M/MS/R/15/02
LOCATION: GARMOUTH ROAD
Units Not Built
Total Units 60Capacity:
Planning Applications:
MOSSTODLOCH The Moray Council Housing Land Audit 2025
Easting: 332766 Northing: 860237
Area (Ha): 3.41
Primary School: Mosstodloch Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 60
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Crown Estate Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
60
60
45Market
15Affordable
60Unknown
Page 316

Page 317

SITE REF: M/MS/R/20/03
LOCATION: BALNACOUL
Units Not Built
Total Units 10Capacity:
Planning Applications:
MOSSTODLOCH The Moray Council Housing Land Audit 2025
Easting: 332551 Northing: 859535
Area (Ha): 2.6
Primary School: Mosstodloch Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/OPP1
Tenure:
Projected Completions:
Constrained Land 10
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Ownership Land Use Type: Commercial
Constraint Notes: Operational requirements
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Forestry and Land Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10
10
7Market
3Affordable
10Unknown
Page 317

Page 318

SITE REF: M/MS/R/20/MU
LOCATION: SOUTH OF A96
Units Not Built
Total Units 350Capacity:
Planning Applications:
MOSSTODLOCH The Moray Council Housing Land Audit 2025
Easting: 333026 Northing: 859605
Area (Ha): 22.3
Primary School: Mosstodloch Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/MUL1
Tenure:
Projected Completions:
Constrained Land 350
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land:
Owner: Crown Estate Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
350
350
262Market
88Affordable
350Unknown
Page 318

Page 319

SITE REF: M/NM/R/001
LOCATION: ISLA ROAD
Units Not Built
Total Units 10Capacity:
Planning Applications:
NEWMILL The Moray Council Housing Land Audit 2025
Easting: 343411 Northing: 852366
Area (Ha): 0.36
Primary School: Newmill Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 0
Supply Type: Constrained
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 10
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Leased on long-term tenancy agreement(s)
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land:
Owner: Newmill Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10
10
7Market
3Affordable
10Unknown
Page 319

Page 320

SITE REF: M/PG/R/07/04
LOCATION: WEST OF REID TERRACE
Units Not Built
Total Units 60Capacity:
Planning Applications:
PORTGORDON The Moray Council Housing Land Audit 2025
Easting: 339143 Northing: 863968
Area (Ha): 3.69
Primary School: Portgordon Primary School
Secondary School: Buckie High School
Ward: Fochabers Lhanbryde
Effective Land 60
Supply Type: Deliverable with
Constraints
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Colin Murray Developments Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 10 10 10 10 10
60
45Market
15Affordable
60
60Unknown
Page 320

Page 321

SITE REF: M/PK/R/004
LOCATION: SEABRAES
Units Not Built
Total Units 60Capacity:
Planning Applications:
PORTKNOCKIE The Moray Council Housing Land Audit 2025
Easting: 349342 Northing: 868487
Area (Ha): 3.01
Primary School: Portknockie Primary School
Secondary School: Buckie High School
Ward: Keith And Cullen
Effective Land 60
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land: 2003
Owner: Seafield Estate Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
04/00799 Outline Refused
10/00418 Screening opinion
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
12 12 12 12 12
60
45Market
15Affordable
60
60Unknown
Page 321

Page 322

SITE REF: M/RF/R/07/01
LOCATION: BROCHLOCH
Units Not Built
Total Units 12Capacity:
Planning Applications:
RAFFORD The Moray Council Housing Land Audit 2025
Easting: 306752 Northing: 855598
Area (Ha): 1.69
Primary School: Anderson's Primary School
Secondary School: Forres Academy
Ward: Forres
Effective Land 12
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2011
Owner: Finderne Development Trust Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
24/00528 12 Full Pending
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
12
12
12Affordable
12
12House
Page 322

Page 323

SITE REF: M/RS/R/07/01
LOCATION: SPEY STREET
Units Not Built
Total Units 30Capacity:
Planning Applications:
ROTHES The Moray Council Housing Land Audit 2025
Easting: 328011 Northing: 849105
Area (Ha): 1.67
Primary School: Rothes Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 30
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land: 2007
Owner: Mr & Mrs Scott Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
15 15
30
22Market
8Affordable
30
30Unknown
Page 323

Page 324

SITE REF: M/RS/R/15/02
LOCATION: GREEN STREET
Units Not Built
Total Units 40Capacity:
Planning Applications:
ROTHES The Moray Council Housing Land Audit 2025
Easting: 328284 Northing: 849451
Area (Ha): 1.74
Primary School: Rothes Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 0
Supply Type: Constrained
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 40
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Brown
Constraint Type: Ownership Land Use Type: Agricultural Building
Constraint Notes: Operational farm buildings
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land:
Owner: Mr Stewart Meldrum Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10 10 20
40
30Market
10Affordable
20
40Unknown
Page 324

Page 325

SITE REF: M/RT/R/001
LOCATION: CASTLE TERRACE
Units Not Built
Total Units 11Capacity:
Planning Applications:
ROTHIEMAY The Moray Council Housing Land Audit 2025
Easting: 354854 Northing: 848405
Area (Ha): 1
Primary School: Rothiemay Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 10
Supply Type: Deliverable with
Constraints
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Financial Land Use Type: Agricultural Land
Constraint Notes: Marketability
Dispute: Agreed Windfall: No
Established Land: 2003 Effective Land:
Owner: Mr Robert Thain Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
15/01013 Full Approved 29/07/2015 Plot 1
14/01431 12 Full Approved 12/11/2014 AMC (07/02477)
11/00991 12 Outline Approved 19/08/2011 Renewal of 07/02477
07/02477 12 Outline Approved 17/07/2008
14/00626 Full Withdrawn
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
10
10
12Market 12House
Page 325

Page 326

SITE REF: M/RT/R/07/02
LOCATION: ANDERSON DRIVE
Units Not Built
Total Units 5Capacity:
Planning Applications:
ROTHIEMAY The Moray Council Housing Land Audit 2025
Easting: 354630 Northing: 848690
Area (Ha): 0.61
Primary School: Rothiemay Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 0
Supply Type: Constrained
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 5
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Physical Conditions Land Use Type: Agricultural Land
Constraint Notes: Flood risk and marketability
Dispute: Agreed Windfall: No
Established Land: 2007 Effective Land:
Owner: Mrs H. Mackenzie Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
5
5
5Market 5Unknown
Page 326

Page 327

SITE REF: M/RT/R/15/03
LOCATION: DEVERONSIDE ROAD
Units Not Built
Total Units 20Capacity:
Planning Applications:
ROTHIEMAY The Moray Council Housing Land Audit 2025
Easting: 354666 Northing: 848375
Area (Ha): 0.92
Primary School: Rothiemay Primary School
Secondary School: Keith Grammar School
Ward: Keith And Cullen
Effective Land 0
Supply Type: Constrained
LPR: 20/R3
Tenure:
Projected Completions:
Constrained Land 20
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Infrastucture Land Use Type: Agricultural Land
Constraint Notes: Road access and marketability
Dispute: Agreed Windfall: No
Established Land: 2015 Effective Land: 2015
Owner: The Church of Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
20
20
15Market
5Affordable
20Unknown
Page 327

Page 328

SITE REF: M/TO/R/21/01
LOCATION: CONGLASS LANE
Units Not Built
Total Units 8Capacity:
Planning Applications:
TOMINTOUL The Moray Council Housing Land Audit 2025
Easting: 316655 Northing: 819218
Area (Ha): 0.5
Primary School: Tomintoul Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 8
Supply Type: Deliverable
LPR: CNPA21/H1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2021 Effective Land: 2021
Owner: Crown Estate Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 4
8
6Market
2Affordable
8
8Unknown
Page 328

Page 329

SITE REF: M/TO/R/21/02
LOCATION: LECHT DRIVE
Units Not Built
Total Units 8Capacity:
Planning Applications:
TOMINTOUL The Moray Council Housing Land Audit 2025
Easting: 317144 Northing: 818525
Area (Ha): 1.1
Primary School: Tomintoul Primary School
Secondary School: Speyside High School
Ward: Speyside Glenlivet
Effective Land 8
Supply Type: Deliverable
LPR: CNPA21/H2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2021 Effective Land: 2021
Owner: Crown Estate Scotland Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 4
8
6Market
2Affordable
8
8Unknown
Page 329

Page 330

SITE REF: M/UR/R/20/01
LOCATION: MEFT ROAD
Units Not Built
Total Units 10Capacity:
Planning Applications:
URQUHART The Moray Council Housing Land Audit 2025
Easting: 328504 Northing: 862749
Area (Ha): 0.8
Primary School: Lhanbryde Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 10
Supply Type: Deliverable
LPR: 20/R1
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: Detail
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2008 Effective Land: 2015
Owner: Findrassie Developments Ltd Developer: Findrassie Developments Ltd
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00120 10 Full Approved 17/02/2022
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 4 2
10
10Market
10
10House
Page 330

Page 331

SITE REF: M/UR/R/20/02
LOCATION: STATION ROAD
Units Not Built
Total Units 8Capacity:
Planning Applications:
URQUHART The Moray Council Housing Land Audit 2025
Easting: 328866 Northing: 862942
Area (Ha): 0.65
Primary School: Lhanbryde Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 8
Supply Type: Deliverable
LPR: 20/R2
Tenure:
Projected Completions:
Constrained Land 0
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Land Use Type: Agricultural Land
Constraint Notes:
Dispute: Agreed Windfall: No
Established Land: 2020 Effective Land: 2020
Owner: Mr Ian Dean Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035+
4 4
8
6Market
2Affordable
8
8Unknown
Page 331

Page 332

SITE REF: M/UR/R/20/L1
LOCATION: MEFT ROAD LONG1
Units Not Built
Total Units 10Capacity:
Planning Applications:
URQUHART The Moray Council Housing Land Audit 2025
Easting: 328425 Northing: 862735
Area (Ha): 0.81
Primary School: Lhanbryde Primary School
Secondary School: Milne's High School
Ward: Fochabers Lhanbryde
Effective Land 0
Supply Type: Constrained
LPR: 20/LNG1
Tenure:
Projected Completions:
Constrained Land 10
Extra Information:
Planning Consent: None
House Programme:Adopted Local Plan:
Green/Brown: Green
Constraint Type: Ownership Land Use Type: Agricultural Land
Constraint Notes: Programming (LONG)
Dispute: Agreed Windfall: No
Established Land: 2008 Effective Land:
Owner: Rattray Family Developer:
Planning:
Application Units Type Decision Decision Date NotesAff Type
Tenure Type Units
Projected 10yr Completions
Unit Type:
Unit Type Units
20/00120 Full Approved 17/02/2022 Small release of LONG