Planning and Regulatory Services Committee 
Tuesday, 12 August 2025 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the Planning
and Regulatory Services Committee to be held at Council Chambers, Council
Office, High Street, Elgin, IV30 1BX on Tuesday, 12 August 2025 at 09:30. 
BUSINESS 
8a) Planning Application 25/00279/APP
Report by Appointed Officer  
Residential development of 5 homes and associated road, landscaping,
infrastructure and drainage, and temporary caravans for use during
construction only at R6 Dallas Dhu, Mannachie Road, Forres, Moray for
Mr and Mrs M Anderson  
3 - 38 
Page 1

Page 2

Page 2

Page 3

WARD 08_17 
25/00279/APP
13th March 2025
Residential development of 5 homes and associated road,
landscaping, infrastructure and drainage, and temporary
caravans for use during construction only at R6 Dallas Dhu
Mannachie Road Forres Moray
for Mr and Mrs M Anderson 
Comments: 
• A site visit will be caried out.
• This application is reported to Committee as it has been submitted by an Officer
involved in the statutory planning process.
• Advertised in the local press for neighbour notification purposes.
• No representations received. 
Procedure: 
• None 
Recommendation 
• Grant Planning Permission but to withhold issue of consent until developer
obligations have been secured, subject to the following conditions: 
Conditions/Reasons 
1. The development to which this permission relates must be begun not later than the
expiration of 3 years beginning with the date on which the permission is granted. 
Reason: The time limit condition is imposed in order to comply with the
requirements of section 58 of the Town and Country Planning (Scotland) Act 1997 as
amended. 
2. The foul and surface water drainage system as detailed in the approved plans and
specified in the approved Drainage Assessment (dated 5/3/25, ref. 317586) shall be
provided in full and made available for use prior to the occupation or completion of
the first house hereby approved (whichever is the soonest). Thereafter foul and
surface water drainage for each house shall connect to the system prior to its first
use or completion. 
Item 8a)
Page 3

Page 4

Reason: To ensure timeous delivery of the approved drainage system, in the
interests of flood risk. 
3. No development shall commence unless a scheme detailing the timing for provision
of the biodiversity and landscape measures as shown in the approved Landscape
Plan & Biodiversity Statement (drawing no. 365 L(PL) 008 Rev A hereby approved).
Thereafter the measures shall be provided in accordance with the approved
timescales. 
Reason: To ensure timeous delivery of the approved landscaping and biodiversity
measures. 
4. Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended) – or any order revoking and re-
enacting that order – no development specified in Schedule 1, Part 1, Class 3E
(means of enclosure and gates) shall be carried out without the approval of the
Council, as Planning Authority. 
Reason: In the interests of the character and appearance of the development and
the surrounding area. 
5. No works in connection with the development hereby approved shall commence
unless an Archaeological Written Scheme of Investigation (WSI) has been submitted
to and approved in writing by the planning authority and a programme of
archaeological works has been carried out in accordance with the approved WSI.
The WSI shall include details of how the recording and recovery of archaeological
resources found within the application site shall be undertaken, and how any
updates, if required, to the written scheme of investigation will be provided
throughout the implementation of the programme of archaeological works. Should
the archaeological works reveal the need for post excavation analysis the
development hereby approved shall not be occupied or brought into use unless a
Post-Excavation Research Design (PERD) for the analysis, publication and
dissemination of results and archive deposition has been submitted to and approved
in writing by the planning authority. The PERD shall be carried out in complete
accordance with the approved details. 
Reason: To safeguard and record the archaeological potential of the area. 
6. No development shall commence until a Construction Environmental Management
Plan (CEMP) has been submitted and agreed in writing by the Planning Authority in
consultation with the Environmental Health Manager. The plan shall include
measures to minimise construction related noise (including vibration), dust and
artificial lighting, as well as measures to ensure construction waste is minimised and
appropriately stored and segregated for recycling where possible. Thereafter the
development will be carried out in accordance with the agreed plan.  
Page 4

Page 5

Reason: In order that environmental emissions are considered and managed at the
construction phase, in order to protect local residents. 
7. Prior to the first use or completion of any house hereby approved, the waste storage
area as shown in the approved drawings to the north west of plot 5 shall be provided
in full for use. Thereafter the waste storage area shall be maintained for use unless
otherwise agreed in writing with the Council, as Planning Authority. 
Reason: To ensure timeous delivery of waste storage, in the interests of the
character and amenity of the surrounding area. 
8. Construction works (including vehicle movements) associated with the development
audible at any point on the boundary of any noise sensitive dwelling shall be
permitted between 0800 - 1900 hours, Monday to Friday and 0800 - 1300 hours on
Saturdays only, and at no other times outwith these permitted hours (including
National Holidays). The above construction hours shall apply, unless otherwise
agreed in writing with the Planning Authority, and where so demonstrated
exceptional operational constraints require limited periods of construction works to
be undertaken outwith the permitted construction hours.  
Reason: To protect local residents from noise nuisance in ensuring the construction
phase is restricted within permitted hours. 
9. Notwithstanding the proposed access arrangements (which are not accepted). No
development shall commence until details have been submitted for approval in
writing by the planning authority in consultation with the roads authority for the
following works:
i.   Road widening of Mannachie Road (C14E) (110 metres or thereby) to provide a
continuous width of 5.5 metres plus a 2 metre wide verge on the east side of
Mannachie Road from the southern boundary of the site frontage onto the road
northwards to the commencement of the existing 5.5m road widening together
with any road tapers, transitions and alterations to the site access and roads
drainage as necessary to form an acceptable layout.
ii.   A continuous 2.5 metre wide cyclepath to an adoptable standard with a 2.5
metre wide verge from the edge of the carriageway widening (to allow for any
future road and cyclepath widening) on the east side of Mannachie Road. The
cyclepath and verge shall extend from the southern boundary of the site
frontage onto the road northwards (125 metres or thereby) to an appropriate
crossing point to provide access to the existing cyclepath on the west side of
Mannachie Road. 
Thereafter unless otherwise approved in writing by the planning authority in
consultation with the roads authority no house shall be completed or occupied
within the development until the works to widen the road and provide the active
travel infrastructure (cyclepath) and verge have been completed in accordance with
the approved details. 
Page 5

Page 6

Reason: The submission of details currently lacking or unacceptable to ensure an
acceptable form of development, the provision of suitable access infrastructure on
the route to the development in the interests of road safety and active travel. 
10. Prior to any development works commencing:
i.    a detailed drawing (scale 1:500 or 1:1000 which shall also include details to
demonstrate control of the land) showing the visibility splay 4.5 metres by 120
metres in both directions at the site access onto Mannachie Road (C14E)
showing boundary walls/fences/hedges set back to a position behind the
required visibility splay, and a schedule of maintenance for the splay area shall
be submitted to and approved by the Council, as Planning Authority in
consultation with the Roads Authority; 
ii.   the visibility splay shall be provided in accordance with the approved drawing
prior to any works commencing (except for those works associated with the
provision of the visibility splay); and
iii.   thereafter, the visibility splay shall be maintained at all times free from any
obstruction exceeding 0.6 metres above the level of the carriageway in
accordance with the agreed schedule of maintenance. 
Reason: To enable drivers of vehicles entering or exiting the site to have a clear view
so that they can undertake the manoeuvre safely and with the minimum interference
to the safety and free flow of traffic on the public road. 
11. The cycleway visibility splay (2.4 metres by 31 metres) as shown on drawing 365
L(PL)010 Rev A shall be provided in accordance with the approved drawing prior to
any works commencing (except for those works associated with the provision of the
visibility splay) and thereafter, the visibility splay shall be maintained at all times free
from any obstruction exceeding 0.6 metres above the level of the cycleway. 
Reason: To enable cyclists and drivers of vehicles crossing the cycleway to have a
clear view so that they can undertake the manoeuvre safely. 
12. Prior to completion or occupation of any house within the development the turning
area within the site shall be provided to enable vehicles to enter and exit in a forward
gear. Thereafter unless otherwise approved in writing by the planning authority the
turning area shall be maintained, kept clear of any obstructions and be available for
that purpose at all times. 
Reason: To ensure the provision for vehicles to enter/exit in a forward gear in the
interest of the safety and free flow of traffic on the public road. 
13. Prior to completion or occupation of the first house hereby approved, the extent of
the site access from the edge of Mannachie Road (C14E to a point 5 metres beyond
the back edge of the cyclepath) shall be constructed to the Moray Council
specification and surfaced with bituminous macadam and have a maximum gradient
of 1:20 unless otherwise approved in writing by the planning authority in consultation
with the roads authority.
Page 6

Page 7

Reason: To enable an acceptable vehicular access is provided to the development in
the interest of road safety. 
14. No boundary fences, hedges, walls or any other obstruction whatsoever over 0.6
metre in height and fronting onto the public road shall be within 2.4 metres of the
edge of the carriageway, measured from the level of the public carriageway, unless
otherwise agreed in writing by the Council, as Planning Authority in consultation with
the Roads Authority. 
Reason: To enable drivers of vehicles leaving driveways to have a clear view over a
length of road sufficient to allow safe exit, in the interests of road safety for the
proposed development and other road users. 
15. Parking provision shall be provided and made available for use at all times to the
Moray Council Parking Standards. The standards for parking as applied at the time of
any application for development shall be in accordance with Parking Standards of
the Moray Local Development Plan 2020 and any associated guidance setting out the
standards of parking including any equivalent planning policy and/or guidance which
supersedes or replaces the identified provisions of the development plan during the
life-time of the permission hereby approved. 
Reason: To ensure the permanent availability of the level of parking necessary for
residents/visitors/others in the interests of an acceptable development and road
safety. 
16.   No development shall commence until details have been submitted to and approved
in writing by the Council, as Planning Authority in consultation with the Roads
Authority regarding the formation of any proposed/required construction access
(which includes any temporary access) to the development from any public road.
The required details shall include
i.   a drawing (scale 1:500 minimum) regarding the location and design
specifications of the proposed access; and
ii.   all traffic management measures required to ensure safe operation of the
construction access; and
iii.   details including materials and timescales for the formation and subsequent
re-instatement of the land once any temporary construction access is no
longer required. 
Thereafter, the works shall be implemented in accordance with the approved details. 
Reason: To ensure an acceptable form of development in terms of the arrangements
to manage traffic during construction works at the site. 
17. No works shall commence on site until details have been submitted to and approved
in writing by the Council, as Planning Authority in consultation with the Roads
Page 7

Page 8

Authority to ensure that no water or loose material shall drain or be carried onto the
public cyclepath/carriageway for the life-time of the development. 
Reason: To ensure the safety and free flow of traffic on the public road and access to
the site by minimising the road safety impact from extraneous material and surface
water in the vicinity of the new access. 
18. The development hereby approved provides for the siting of one caravan on each plot
(as per approved drawing number 365 L(PL) 006 Rev A) for a temporary period of two
years (the date of which will run from the commencement of development on each
plot). After the period of two years, the temporary caravan shall be removed from the
respective plot and the ground reinstated to the satisfaction of the planning
authority, unless otherwise agreed in writing by the Council, Planning Authority. 
Reason: To ensure the caravans are sited for a temporary period, in the interests of
the character and amenity of the surrounding area. 
Reason(s) for Decision
The Council’s reason(s) for making this decision are:- 
The development complies with the provisions of the development plan (namely National
Planning Framework 4 and the Moray Local Development Plan 2020), as well as the
adopted Dallas Dhu Masterplan, and there are no material considerations that indicate
otherwise. 
List of Informatives: 
THE DEVELOPMENT MANAGEMENT & BUILDING STANDARDS MANAGER has commented
that:- 
A Building Warrant will be required for the proposals. Should you require further
assistance please contact the Building Standards Duty Officer between 2pm and
4pm or telephone on 03001234561.  No appointment is necessary.  Alternatively e-
mail buildingstandards@moray.gov.uk 
ABERDEENSHIRE COUNCIL ARCHAEOLOGY SERVICE has commented that:- 
Works by archaeological organisation
Any archaeological survey, watching brief or archaeological works required by a
condition attached to this planning permission must be undertaken by a suitably
qualified archaeological organisation. 
Written Scheme of Investigation (WSI)
A written specification produced by the appointed Chartered Institute for
Archaeologists (CIfA) member archaeological contractor on behalf of the applicant
Page 8

Page 9

which outlines in detail the proposed scheme of archaeological investigation. It
should detail what archaeological works will be carried out and how; how any
encountered archaeological remains will be dealt with; how any updates to the WSI
will be provided; the reporting process; and the potential for post-excavation
requirement. The WSI must be submitted to the planning authority for approval
before being implemented. The contents of the WSI must conform to the relevant
national and CIfA standards and guidance. 
Archaeological Discoveries Bona Vacantia
The developer has a legal requirement, under the laws of bona vacantia to report to
the Treasure Trove Unit any objects or artefacts found during development works. 
Post-Excavation Research Design (PERD)
A written specification for the post-excavation analysis of artefacts and samples
recovery during the excavation phase or archaeological works, prepared by the
appointed Chartered Institute for Archaeologists (CIfA) member archaeological
contractor on behalf of the applicant. This should include a project design for the
post-excavation work, a costed assessment for this work, and costed proposals for
the publication of results. The PERD must be submitted to the planning authority for
approval. Once the PERD has been agreed, written confirmation must be provided to
the planning authority demonstrating that an agreement is in place between the
applicant and the appointed CIfA member archaeological contractor, committing the
applicant to fund the post-excavation work and for said work to be completed by an
agreed date. 
SCOTTISH GAS NETWORKS has commented that:- 
A high-pressure gas pipeline is located in proximity of this site. Excavations,
stockpiling of material, vehicles crossing over the route of the pipeline, changes in
ground levels, drilling, piling and the siting of temporary structures, cabins and
containers are all activities that can have a negative impact on the pipeline. This list
is not exhaustive and SGN advice should be sought if in any doubt. 
THE TRANSPORTATION MANAGER has commented that:- 
Before commencing development, the applicant is obliged to apply for Construction
Consent in accordance with Section 21 of the Roads (Scotland) Act 1984 for new
roads. The applicant will be required to provide technical information, including
drawings and drainage calculations, and provide a Road Bond to cover the full value
of the works in accordance with the Security for Private Road Works (Scotland) 1985
Regulations. Advice on this matter can be obtained from the Moray Council web site
or by emailing transport.develop@moray.gov.uk 
Construction Consent shall include a CCTV survey of all existing roads drainage to
be adopted and core samples to determine the construction depths and materials of
the existing road. 
Page 9

Page 10

Requirement for any traffic calming, road construction materials and specifications
for any SuDS related to the drainage of the public road must be submitted and
approved through the formal Roads Construction Consent process. 
Planning consent does not carry with it the right to carry out works within the public
road boundary and the applicant is obliged to contact the Transportation Manager for
road opening permit in accordance with the Roads (Scotland) Act 1984. This includes
any temporary access joining with the public road. 
For the avoidance of doubt, there will be no planting within the public road (including
verges) unless otherwise agreed in writing by the Council, as Planning Authority in
consultation with the Roads Authority. 
In curtilage Electric Vehicle (EV) charging provision requirements are covered by
building warrant. EV charging must be retained for this purpose for the lifetime of the
development unless otherwise agreed in writing by the Planning Authority. Guidance
on Electric Vehicle (EV) Charging requirements can be found in the Moray Local
Development Plan Policy and Additional Guidance 
http://www.moray.gov.uk/downloads/file147031.pdf 
If required, street furniture which needs to be repositioned will be at the expense of
the developer.  In addition any existing roadside ditch may require a pipe or culvert.
Advice on these matters can be obtained by e-mailing
transport.develop@moray.gov.uk 
No building materials/scaffolding/builder's skip shall obstruct the public road
(including footpaths) without permission from the Roads Authority. 
The applicant shall be responsible for ensuring that surface/ground water does not
run from the public road into their property. 
The applicant shall ensure that their operations do not adversely affect any Public
Utilities, which should be contacted prior to commencement of operations. 
The applicants shall free and relieve the Roads Authority from any claims arising out
of their operations on the road or extension to the road. 
The Transportation Manager must always be contacted before any works
commence. This includes any temporary access, which should be agreed with the
Roads Authority prior to work commencing on it. 
No retaining structures or embankments shall be constructed along the edge of the
road, whether retaining the public road or ground adjoining the public road without
prior consultation and agreement of the Roads Authority. 
Page 10

Page 11

LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT
Reference No. Version No. Title/Description
1075-00-DR-XX-79-202 P2 Plot 3 - garage - floor plan
1075-00-DR-XX-79-202 P1 Typical garage - floor plan
1075-2-HEB-XX-00-DR-A-20-200  P01 Plot 2 - ground and first floor plans
1075-2-HEB-XX-XX-DR-A-20-400  P01 Plot 2 - elevations
1075-3-HEB-XX-00-DR-A-20-200  P01 Plots 1, 4 and 5 - ground and first floor plans
1075-3-HEB-XX-XX-DR-A-20-400  P01 Plots 1, 4 and 5 - elevations
1075-HEB-XX-00-DR-A-20-200  P5 Plot 3 - ground and first floor plans
1075-HEB-XX-XX-DR-A-20-400  P4 Plot 3 - front and side elevations
1075-HEB-XX-XX-DR-A-20-401  P3 Plot 3 - rear and side elevations
1075-R1-DR-XX-79-203  P1 Plot 3 - garage - roof plan
1075-R1-DR-XX-79-203  P1 Typical garage - roof plan
1075-XX-DR-XX-79-204  P1 Plot 3 - garage - front elevation
1075-XX-DR-XX-79-204  P1 Typical garage - front elevation
1075-XX-DR-XX-79-205  P2 Plot 3 - garage - rear elevation
1075-XX-DR-XX-79-205  P1 Typical garage - rear elevation
1075-XX-DR-XX-79-206  P2 Plot 3 - garage - side elevation 1
1075-XX-DR-XX-79-206  P1 Typical garage - side elevation 1
1075-XX-DR-XX-79-207  P2 Plot 3 - garage - side elevation 2
1075-XX-DR-XX-79-207  P1 Typical garage - side elevation 2
213 L(PL) 011 A Infrastructure delivery plan
365 L(PL) 006 A Site plan 1:500 - with temporary caravans
365 L(PL) 008 A Landscape plan and biodiversity statement
365 L(PL) 009 A Site plan with road widening
365 L(PL) 010 A Site plan with paths and cycle way
365 L(PL) 011 A Site plan with layby dimensions
365 L(PL) 101 B Plot 1 - first floor plan
365 L(EX) 001  Location plan 
365 L(PL) 001 B Site plan 1:1000
365 L(PL) 002 B Site plan 1:1000 with wider masterplan
365 L(PL) 003 B Site plan 1:500 - ground floors
365 L(PL) 004 B Site plan 1:500 - first floors
365 L(PL) 005 B Site plan 1:500 - roofs
365 L(PL) 100 B Plot 1 - ground floor plan
365 L(PL) 110 B Plot 2 - ground floor plan
365 L(PL) 111 B Plot 2 - first floor plan
365 L(PL) 112 B Plot 2 - roof plan
365 L(PL) 120 B Plot 3 - ground floor plan
365 L(PL) 121 B Plot 3 - first floor plan
365 L(PL) 122 B Plot 3 - roof plan
365 L(PL) 130 B Plot 4 - ground floor plan
Page 11

Page 12

365 L(PL) 131 B Plot 4 - first floor plan
365 L(PL) 132 B Plot 4 - roof plan
365 L(PL) 140 B Plot 5 - ground floor plan
365 L(PL) 141 B Plot 5 - first floor plan
365 L(PL) 142 B Plot 5 - roof plan
365 L(PL) 300 B Site Sections 
Page 12

Page 13

Plans, drawings and other material submitted to the local authority
are protected by the Copyright, Designs and Patents Act 1988
(section 47). You may only use material which is downloaded and/
or printed for consultation purposes, to compare current
applications with previous schemes and to check whether
developments have been completed in accordance with approved
plans.
Further copies must not be made without the prior permission of
the copyright owner.
Maps shown in the Planning Committee Report can only be used
for the purposes of the Planning Committee. Any other use risks
infringing Crown Copyright and may lead to prosecution or civil
proceedings. Maps produced within this Planning Committee
Report can only be reproduced with the express permission of the
Moray Council and other Copyright holders. This permission must
be granted in advance. PLANNING APPLICATION
COMMITTEE SITE PLAN
Site Address:
R6 Dallas Dhu
Mannachie Road Forres
Planning Application Ref Number: 
25/00279/APP
Location Plan
Applicant Name:
Mr And Mrs M
Anderson
Page 13

Page 14

Location
plan
Page 14

Page 15

Site
plan
16/
016
Page 15

Page 16

Site
plan
w
ith
w
ider m
asterplan
16/
Page 16

Page 17

Landscape
plan
16/
Page 17

Page 18

Elevations—
Plots
1, 4
and
5 
16/
Page 18

Page 19

Page 19

Page 20

Photo
1
16/
Page 20

Page 21

Photo
2
16/
Page 21

Page 22

Photo
16/
Page 22

Page 23

Photo
16/
Page 23

Page 24

Page 24

Page 25

PLANNING APPLICATION: 25/00279/APP 
In the event that a recommendation on this planning application is overturned the
Committee is reminded of the advice contained on the front page of the agenda for Reports
on Applications 
1.   THE PROPOSAL 
•   Residential development of five dwellinghouses with associated road,
landscaping, parking and drainage. 
•   Each plot contains a double garage with a ridge height of no more than 5.1m,
to be finished in vertical timber cladding and a pitched roof over in natural
slate (plots 1, 2, 4, and 5) or metal profile sheeting (plot 3).
•   One temporary caravan per plot is proposed for use during construction
works.
•   Four of the dwellings contain five bedrooms and one contains four
bedrooms. 
•   Each dwellinghouse design is of a simple traditional design of either single or
one-and-a-half storey. 
•   Landscaping and biodiversity enhancement are proposed and include native
hedging to plot boundaries and a mix of native tree species planting both
within plots and wider site. 
•   Foul drainage will be by means of a treatment plant for each plot and
thereafter to a combined foul water soakaway within the wider site.
•   Surface water will be by means of an individual surface water soakaway
within each plot.
•   The dwellinghouses are proposed to be connected to the public water
supply. 
2.   THE SITE 
•   A 1.05ha area of ground within the Forres R6 Dallas Dhu designation for
housing development land in the Moray Local Development Plan 2020. 
•   Site is within the ‘rural edges’ character area as defined in the adopted
Dallas Dhu Masterplan. 
•   The site is bound by Mannachie Road to the west, with an area of woodland
to the west and the housing development at Knockomie Braes to the north
west which is nearing completion. 
•   The remainder of the site is bounded by agricultural land that forms part of
the R6 designation. Mannachie Farm and Dallas Dhu Distillery are to the
south of this site. 
•   A residential development of 24 affordable homes, 10 serviced house plots,
a 40 bed space student accommodation block would lie to the north, which
Page 25

Page 26

is minded to be approved under Phase 2 Dallas Dhu (24/01087/APP refers –
see history below).
•   A high pressure gas pipeline runs to the north of the site.   
3.   HISTORY 
22/01814/SCN - Environmental Impact Assessment (EIA) Screening Opinion
submitted to Moray Council for residential development on a site designated for
136 houses at R6 Dallas Dhu, Forres. Moray Council adopted a screening opinion
on 15 December 2022 stating the Environment Impact Assessment was not
required. 
23/01021/PAN - Proposal of Application Notice (PAN) for a residential
development of a maximum of 180 units including associated facilities
landscaping infrastructure roads and drainage submitted 16 June 2023. This PAN
was presented to this Committee at its meeting of 15 August 2023 (minute refers)
and Members agreed to highlight that the developer considers:
•   access concerns - access off A940 busy and access into Dallas Dhu is tight,
and the impact of increased traffic caused by the development on
Mannachie Road - need to monitor traffic volumes and put in any necessary
safety measures; 
•   the creation of a cycle path on Mannachie Road;
•   the possible impact on nearby rural roads being used as short cuts - in
particular the link to the B9010 Dallas/Rafford Road; and
•   how any crossing of the Dava Way is addressed. 
23/02061/PAN - PAN for a residential development of a maximum of 180 units
and approximately 40 bedspaces of student accommodation including
associated facilities landscaping infrastructure roads and drainage submitted 21
November 2023. This PAN was presented to this Committee at its meeting of 19
December 2023 (minute refers) and Members agreed that the developer should:
•   address the concerns previously raised under PAN ref 23/01021/PAN; and
consider connectivity between the proposed student accommodation and
the Glasgow School of Art Campus at Altyre, particularly in terms of active
travel. 
24/01087/APP - Planning permission to erect 24 affordable homes 40-bed space
student accommodation and associated shared facilities 4 custom-build plots
and 6 housing innovation plots and associated landscaping infrastructure roads
and drainage on Phase 1 at R6 Dallas Dhu, Mannachie Road, Forres. Application
reported to this Committee at its meeting of 15 March 2025 where Members were
resolved to approve planning permission, subject to conclusion of a section 75
legal agreement. At the time of writing this report, the section 75 has not
concluded and agreed therefore consent is yet to be issued. 
Page 26

Page 27

4.   POLICIES 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 4 - Natural places
Policy 5 - Soils
Policy 6 - Forestry, woodland and trees
Policy 7 - Historic assets and places
Policy 13 - Sustainable transport
Policy 14 - Design, quality and place
Policy 15 - Local living and 20 minute neighbourhoods
Policy 16 - Quality homes
Policy 20 - Blue and green infrastructure
Policy 22 - Flood risk
Policy 23 - Health and safety 
Moray Local Development Plan 2020 
PP1 Placemaking
PP2 Sustainable Economic Growth
PP3 Infrastructure and Services
DP1 Development Principles
DP2 Housing
EP1 Natural Heritage Designation
EP2 Biodiversity
EP7 Forestry Woodland and Trees
EP12 Management and Enhancement of the Water Environment
EP13 Foul Drainage
EP14 Pollution Contamination & Hazards
Forres - Dallas Dhu 
Dallas Dhu Masterplan 
5.   ADVERTISEMENTS 
•   Application advertised for neighbour notification purposes. 
6.   CONSULTATIONS 
Scotland Gas Networks Ltd – No Objections. Informative to be added on works
near the pipeline. 
Page 27

Page 28

Aberdeenshire Council Archaeology Service – No Objections subject to a
condition requiring a Written Scheme of Investigation to be submitted to and
approved by the planning authority. 
Planning And Development Obligations – Obligations sought for Transport,
Healthcare and Sports and Recreation. 
Environmental Health Manager - No Objections subject to conditions requiring a
Construction Environmental Management Plan (CEMP) and limiting construction
working hours.  
Contaminated Land – No Objections.   
Transportation Manager – No objections subject to conditions requiring widening
of Mannachie Road along site frontage, as well as provision of cycle crossing point
from west side of Mannachie Road to serve this proposal. Conditions also
recommended in respect of parking and access, including provision of visibility
splays. 
Moray Flood Risk Management - No Objections. 
Scottish Water – No Objections. Further investigations may be required to be
carried out when a formal application is submitted to Scottish Water.    
Scottish Environment Protection Agency – No Objections. 
Moray Access Manager - No Objections. 
Moray Council Other Depts – Housing - No Objections. Noted that the proposals
form part of the Dallas Dhu Masterplan already approved, which defines the
locations of the affordable housing required from the whole masterplan area.
Therefore, no affordable housing is required from this application. 
Health And Safety Executive – No Objections.   
7.   OBJECTIONS-REPRESENTATIONS 
•   None received 
8.   OBSERVATIONS 
8.1 Section 25 of the 1997 Act as amended requires applications to be determined in
accordance with the Development Plan i.e., the adopted National Planning
Framework 4 (NPF4) and adopted Moray Local Development Plan 2020 (MLDP)
unless material considerations indicate otherwise. 
The main issues are considered below:
Page 28

Page 29

8.2 Principle of Development 
The site subject to this proposal forms part of the Forres R6 Dallas Dhu site, as
designated in the Forres Settlement Statement. The designation text for this site
contains a significant number of requirements, emphasising on the need for
sustainable design, environmental preservation and infrastructure integration,
requiring: 
•   Proposals to align with the Dallas Dhu Masterplan, retaining natural features
like distinctive knolls and minimising earthworks. 
•   The northern and central areas to adopt an urban character, while the
southern and eastern areas should remain rural.
•   Enhanced access to the Dava Way and integration with core paths,
cycleways, and recreational routes is mandated. 
•   Open spaces and play areas to align with Masterplan guidelines. 
•   Improvements to local infrastructure, including widening of Mannachie Road
and 3m cycle path along the eastern frontage, provision of bus stop
infrastructure and developer contributions for public transport and junction
and road improvements informed by a Transport Assessment. 
•   Flood storage areas to be reserved and compatible with water retention,
supported by a Flood Risk Assessment and Emergency Evacuation Plan. 
•   A Phase 1 Habitat Survey, Drainage Impact Assessment, Archaeological
evaluation, woodland and peat assessments to be undertaken. 
NPF4 Policy 16 (Quality Homes) is the Scottish Government’s national planning
policy for housing, and of relevance to this proposal: 
•   part (a) states development of new housing on land designated for housing
in local development plans will be supported; and 
•   part (c) supports proposals that improve housing affordability and choice,
including self-built homes, accessible homes, affordable homes, larger
family housing, as well as housing for older people, students and other
specialised groups. 
MLDP Policy DP2 (Housing) supports housing on designated housing sites, but
states that all proposals should be accompanied by a design statement that
addresses the overall site layout including infrastructure provision. It requires
there to be a comprehensive layout for the site in instances of piecemeal
developments of a designated site, whilst also noting that housing capacity
figures in site designations are indicative. Density of development is assessed on
a case-by-case basis, taking account of site characteristics and context, as well
as compliance with relevant policies, in particular placemaking. 
This proposal seeks planning permission for five dwellinghouses within the R6
Dallas Dhu Designation. Whilst there is a common simple dwellinghouse design
across the units, the style and scale varies with a mix of four/five bed units and
single and one-and-a-half-storey designs, all finished in high quality traditional
materials. 
Page 29

Page 30

The following evaluation gives consideration to policy compliance, which will refer
to each of the relevant designation requirements of the site. 
Taking account of these matters, the general principle of this proposed housing is
considered suitable under the terms of NPF4 Policy 16 and MLDP Policy DP2. 
8.3 Dallas Dhu Masterplan 
The Dallas Dhu Masterplan (the Masterplan) is a material planning consideration
that sets out a framework for the development of the Forres R4 and R6
designations of the MLDP. It aims to ensure the site is developed in a co-ordinated
fashion, allowing Forres to expand into its surrounding countryside with the aim of
forming a seamless transition from urban to rural landscapes. It is a material
planning consideration in the determination of planning applications on these
designations, including this proposal. Its requirements will be considered as part
of the determination of this application, particularly in respect of design and
layout. 
The site lies within the southern part of the R6 Dallas Dhu designation and falls
under the ‘Rural Edges Character Area’ as defined within the Dallas Dhu
Masterplan. Phase 1 covers site R4 and lies to the north of the R6 designation.
Phase 1 is subject to a pending application for 32 houses (application ref:
23/02096/APP). Phases 2 and 3 are in the north western corner of the site. Phase 2
was subject to a recent decision by this Committee, which was minded to approve
an application for the development of 24 affordable houses, 10 house plots and a
40 bed student accommodation block (Minute of Planning and Regulatory
Services Committee of 11 March 2025 refers).   
The current proposal would come under Phase 4 in terms of the phasing and
delivery schedule set out in the adopted Masterplan. Whilst this proposal is for a
later phase, with phase 3 to still come forward, the site subject to this application
sits on its own, and the indicative layout in the masterplan shows small rural
clusters of housing accessed from Mannachie Road, separate from earlier
phases. Their early provision would not prejudice delivery of earlier phases of the
Masterplan. 
Taking account of the above considerations, the proposal is not at odds with the
Masterplan, and subsequently the R6 designation text requiring compliance with
the Masterplan. 
8.4 Siting and Design
NPF4 Policy 14 (Design Quality and Place) requires proposals to be consistent
with the six qualities of successful places which are healthy, pleasant, connected,
distinctive, sustainable and adaptable. Proposals which are poorly designed,
detrimental to the amenity of the surrounding area or inconsistent with these
qualities will not be supported. 
MLDP Policy DP1 (Development Principles) sets out the need for the scale, density
and character of development to be appropriate to the surrounding area. 
Page 30

Page 31

The R6 Dallas Dhu designation text states that the southern part of the
designation should remain rural. Furthermore, the Masterplan designates this
area as the ‘Rural Edges Character Area’ and outlines the following key design
principals relevant to this site:
•   Houses must not present a blank gable onto Mannachie Road and dual
frontage will be required. 
•   Houses must be grouped in a traditional rural form and be sympathetic
contemporary interpretation of traditional rural design (including meeting
the Moray Council Rural Housing Gable/Pitch formula and avoiding
excessive suburban detailing). 
The submitted Design and Access Statement outlines that the housing
development proposed is a contemporary ‘smart clachan’ cluster of 5 homes,
with individual dwellings inspired by the Scottish ‘Long House’. Houses will be
positioned largely with gables facing onto the proposed access lane, to maximise
views onto the wider landscape and provide an active frontage onto Mannachie
Road at plots 1 and 5. 
Whilst the garages in plots 1 and 5 present a blank elevation to the public road,
the main dwellinghouses would be orientated onto Mannachie Road, providing an
‘active frontage’ as required in the Masterplan.  Additional tree planting to the
south and west of the detached garage at plot 5, and to the north of the garage a
plot 1 ensure the visual impact of these are minimised upon approach to the site
from either the north or south. 
The plot layout and dwellinghouse orientation is deemed to comply with the
requirements of NPF4 Policy 14, DP1 and the ideals contained in the Masterplan
for the “Rural Edges Character Area”. 
Furthermore, each dwellinghouse would meet the gable width formula and
required roof pitch in line with the Masterplan and the Rural Housing Design
Requirements under MLDP Policy DP4 (which are referred to in the Masterplan).
The overall dwellinghouse design is a simple, low and long building (with a ridge
height of between approx. 6.1m and 6.3m), with any first-floor accommodation
within the roof space. A sloped roof dormer is proposed on plots 2 and 3 however
this is located to the rear and does not dominate the roof plane.  Overall the
proposed dwellinghouse designs are welcomed and would fit within the rural
edges character requirements.   
In terms of materials, the Masterplan outlined the following as suitable for the
rural edges character area:
•   Natural slate roof finish (on Mannachie Road frontage). 
•   Wet dash render, white render and natural timber.
•   Natural stone frontages to replicate steadings and traditional rural buildings.
•   Natural timber cladding. 
•   Contemporary modern materials such as high-quality metal sheeting
including zinc and lead based roofing options. 
Page 31

Page 32

The dwellings are all proposed to be finished in vertical timber cladding, with a
pitched roof over. Plots 1 and 5 (facing Mannachie Road) will be finished in natural
slate to the roof, with the remaining plots (2, 3 and 4) to be finished in metal profile
sheeting roofing in anthracite grey. All garages will be finished in vertical timber
cladding with metal profile sheeting over the pitched roof. Guttering will be
constructed in metal and windows in timber, painted anthracite grey. These
materials are acceptable in line with the Masterplan requirements and will ensure
the housing blends into the wider rural countryside beyond the R6 Designation
and are considered to comply with NPF4 Policy 14 and DP1 in terms of siting and
design. 
The Masterplan outlines that plot boundaries within the rural edges character area
must be demarcated by native hedge planting, post and wire fencing and natural
stone dykes. It notes that timber fencing in this character area is not appropriate.
The drawings submitted show a mix of hedging to enclose the plot boundaries and
this is deemed acceptable and in accordance with the Masterplan. 
Overall and taking account of the above matters, the proposal is design and sited
in accordance with the Masterplan, as well as NPF4 Policy 14 and MLDP Policy
DP1. 
8.5 Access and Parking
NPF4 Policy 13 (Sustainable Transport) seeks to encourage, promote and
facilitate development that prioritises sustainable travel. MLDP Policies PP3
(Infrastructure and Services) and DP1 (Development Principles) require the
provision of a safe entry/exit from new development, with appropriate
infrastructure, parking, cycle parking and Electric Vehicle (EV) charging facilities.
The Masterplan and Forres Settlement Statement of the MLDP (R6 designation
and TSPs) also contain criteria from a transportation perspective. These cover a
number of matters, including widening of Mannachie Road, provision of cycle
infrastructure on the east side of Mannachie Road, bus stop infrastructure, as well
as closure or upgrade of the road running between the A940 and Mannachie Road
at Fairyhills Wood. 
With reference to this proposal and its relatively small scale, Transportation have
identified there is a need for further widening of Mannachie Road along the site
frontage to 5.5 metres. It would be disproportionate to require a cyclepath to be
provided on the east side of Mannachie Road, therefore a 2.5-metre cyclepath
with a crossing to the west side is considered acceptable, with future
safeguarding for widening. 
Neither upgrade is shown on the submitted plans, however there is sufficient
space safeguarded on these plans. Accordingly, suspensive conditions can be
applied requiring details of these upgrades to be submitted along with their
provision as part of any approval. 
Obligations have been sought towards public transport and forward funded
upgrades that were undertaken at the Orchard Road/Thornhill Road/Grantown
Road junction (as required by TSP 18).
Page 32

Page 33

The remainder of transportation requirements would be delivered as part of future
phases of the Masterplan area. 
Standard conditions in respect of parking and access, including provision of a
service layby and visibility splays at the access junction have also been
recommended in the Transportation consultation response. 
Subject to conditions as recommended, the proposal is considered to comply
with NPF4 Policy 13, MLDP policies PP3 and DP1, as well as the Masterplan and
R6 designation requirements insofar as they are applicable to a proposal of this
scale. 
8.6 Temporary Caravans
A temporary caravan is proposed within each plot to provide accommodation
during construction works for each dwellinghouse. The general approach to
residential caravans in Moray is to grant them on a temporary basis as they are not
considered to be suitable as permanent residences.    
On this basis a condition is recommended restricting the siting of any temporary
caravan for a period of two years. 
8.7 Landscaping and Biodiversity
NPF4 Policy 3 (Biodiversity) and MLDP Policy EP2 (Biodiversity) seek to ensure that
all development actively contributes to maintaining and enhancing biodiversity. 
The Masterplan outlines the following landscaping requirements:
•   Distinctive knolls must be retained and earthworks minimised to sensitively
integrate housing into the landscape.
•   Appropriate landscaping must be provided to ensure that houses integrate
sensitively into the landscape and read as part of the surrounding Dallas
Dhu character area.
•   Landscaping must help mitigate the visual impact of parking where this is
located at the front of buildings and where there are parking courts. 
It is noted that the application was submitted prior to the NPF Policy 3 Guidance
being adopted however a Biodiversity Statement and Landscaping Plan have been
provided with the proposals in line with NPF4 policy 3 and MLDP 2020 Policy EP2. 
The Biodiversity Statement outlines that the development will see a mix of tree
planting species, including fruit and native tree groups and hedges which will
provide additional habitat resources for a range of wildlife. A wildflower meadow
will also be planted along with bee bricks on south-facing walls of each dwelling.
It is also noted that a ‘hollows and knolls’ area lies further to the north and is not
within this site. 
A condition is recommended requiring a plan which details timing for provision of
landscaping and biodiversity measures to ensure compliance with NPF4 policy 3
and MLDP Policy EP2. 
Page 33

Page 34

8.8 Sustainability and Climate Change
NPF4 Policy 10 (Tackling the Climate and Nature Crisis) and MLDP Policy 2
(Climate Mitigation and Adaptation) supports development which addresses the
global climate emergency and nature crises and minimises greenhouse gas
emissions as far as possible. 
A Carbon Statement is not required to be submitted if the development is for less
than 10 units. Overall, this is a small development of five houses on a designated
site within the MLDP. The applicant’s Design and Access Statement contends that
the dwellings will be highly energy efficient, serviced by air source heat pumps
(ASHPs), mechanical ventilation with heat recovery (MVHR) systems and solar
panelling to ensure less reliance on fossil fuels. As such the proposals are
deemed to comply with NPF4 Policies 1 and 2 in terms of the global climate
emergency and nature crises. 
8.9 Drainage and Flood Risk
NPF4 Policy 22 (Flood Risk & Water Management) seeks to strengthen resilience
of development to flood risk through avoidance as a first principle and reducing
the vulnerability of existing/future development to flooding. It also advocates use
of SuDS to ensure surface water does not increase flood risk to itself and others
and supports connection to public water mains unless this is not feasible. MLDP
Policy EP12 (Management and Enhancement of the Water Environment) takes a
similar position. 
Flood Risk
An area of medium risk river flooding lies to the eastern part of the site according
to the SEPA maps. 
SEPA have been consulted and have raised no objections. SEPA outlined in their
consultation response that Council modelling had been previously commissioned
into the flood risk on the Mosset Burn scheme at Chapelton Dam and this
indicated that the site lies outwith the flood risk area. Additionally, topographic
information provided in support of the application indicates that the site rises
from east to west away from the area which could be impacted by the flood
storage area. Moray Flood Risk Management have raised no objections in respect
of flooding. 
The proposal is therefore considered to comply with NPF4 Policy 22 and MLDP
2020 policy EP12 in terms of flood risk 
Surface Water Drainage
NPF4 Policy 22 (Flood Risk & Water Management) seeks to strengthen resilience
of development to flood risk through avoidance as a first principle and reducing
the vulnerability of existing/future development to flooding. It also advocates use
of SuDS to ensure surface water does not increase flood risk to itself and others
and supports connection to public water mains unless this is not feasible. MLDP
Page 34

Page 35

Policy EP12 (Management and Enhancement of the Water Environment) takes a
similar position. 
As outlined it is proposed to install an individual surface water soakaway for each
of the five plots. A Drainage Assessment has been submitted which provides
details of ground testing and calculations which were undertaken to confirm
ground suitability. Moray Flood Risk Management have been consulted and no
objections have been raised. A condition would be applied to any final consent
requiring the drainage design to be implemented as per the agreed details.
Therefore subject to compliance with a condition, the proposals would comply
with the surface water drainage requirements of NPF4 Policy 22 and MLDP 2020
Policy EP12. 
Foul Water Drainage
MLDP Policy EP13 Foul Drainage requires that all development within or close to
settlements (as above) of less than 2,000 population will require to connect to
public sewerage except where a compelling case is made otherwise. Factors to be
considered in such a case will include size of the proposed development, whether
the development would jeopardise delivery of public sewerage infrastructure and
existing drainage problems within the area. 
Where a compelling case is made, a private system may be acceptable provided it
does not pose or add a risk of detrimental effects, including cumulative, to the
natural and built environment, surrounding uses or amenity of the general area. 
Policy EP13 also places emphasis on a discharge to land via a full soakaway,
where a private foul drainage system is accepted. 
The Masterplan also outlines that foul drainage should be pumped from the south
of the development area to the high point towards the north of the site where it will
connect with the public drainage system. 
As outlined, it is proposed to install private foul drainage for the development. The
site is a designated housing site within the Forres Settlement and therefore there
is a requirement under MLDP Policy 13 to connect to the public sewer, except
where a compelling case is made otherwise. 
Concern was raised to the agent upon initial receipt of the application regarding
the proposal not to connect to the public sewer, largely as this was in direct
conflict with MLDP Policy EP13 and the Masterplan. 
Following a site meeting with the agent and applicant and submission of an
additional supporting statement, it was outlined that the site sits approx. 550m to
the south of the nearest public sewer. A high-pressure gas pipeline also runs to
the north (with an associated stand-off line of 32 metres). Additional consultation
was undertaken with SEPA and Scottish Water on this matter. SEPA confirmed
that SEPA Water Permitting will generally identify a development as being near to
the public sewer by multiplying the number of domestic properties by 30m. For
Page 35

Page 36

this development the screening distance is 150m and the distance to the nearest
sewer is approx. 550m to the north. 
SEPA further outlined therefore that private foul drainage could potentially be
authorised in this case however the technical difficulty in crossing the high
pressure gas pipeline would need to be qualified to provide appropriate
justification. 
An indicative figure of approx. £231,000 (excluding VAT) was provided in the
agent’s statement for pipework to connect the development to the nearest sewer.
Scottish Water have indicated to the Council that the costs of a sewer connection
may actually be higher than the agent’s estimate.   
Recognising this proposal is for 5 houses, it is therefore deemed in this case the
requirement to connect to the public sewer would not be viable for a development
of this scale. 
High Pressure Gas Pipeline
A high pressure gas pipeline runs to the north of the site. HSE were consulted on
the application and no objections were raised. SGN were also consulted and
whilst an initial objection was returned, following a site meeting to be undertaken
to identify the location of the pipeline in relation to the proposed dwellings, the
objection was subsequently lifted. An informative would be recommended to be
added to any final consent reminding the developer of the work within proximity of
the pipeline during construction works.  
Therefore, the proposals are deemed to comply with the requirements of NPF4
Policy 23 and MLDP Policy EP14. 
8.10 Cultural Heritage
NPF4 Policy 7 (Historic Assets and Places) notes that where there is potential for
non-designated buried archaeological remains to exist below a site, developers
should provide evaluation of the site at an early stage. This policy also seeks to
ensure that any proposals affecting the setting of a listed building should preserve
its character and special interest. 
MLDP Policy EP8 (Historic Environments) seeks to ensure that there is no adverse
effect on sites of local archaeological importance or the integrity of their settings. 
The site occupies an area which is in close proximity to archaeological sites
evidencing prehistoric and medieval activity. This indicates the potential for
further, previously unrecorded, archaeological remains to survive within the
proposed development site. The Council’s Archaeologist has been consulted and
has raised no objections however has recommended a condition requiring a
Written Scheme of Investigation (WSI) to be submitted to the Council, with a
requirement for post excavation analysis should it be required. Subject to
condition requiring this, the proposal is considered to comply with NPF4 Policy 7
and MLDP Policy EP8. 
Page 36

Page 37

8.11 Developer Obligations 
NPF4 Policy 18 (Infrastructure first) and MLDP Policy PP3 (Infrastructure and
Services) alongside the Council's Supplementary Guidance on Developer
Obligations, identify instances where developer obligations are necessary to
mitigate the impact of a proposal on local services and infrastructure. 
The Developer Obligations team have been consulted and have provided a report
identifying obligations required towards Transport (Contribution towards public
transport and Orchard Road/Thornhill Road junction improvement), Healthcare
(extension at Forres Health Centre, 2 additional dental chairs and reconfiguration
of existing pharmacy outlets), and Sports and Recreation (3G pitch in Forres). 
These obligations would require to be paid should the application be approved.
Alternatively, a section 75 agreement can be secured prior to the issuing of any
planning consent. 
8.12 Affordable Housing 
NPF4 Policy 16 (Quality Homes) seeks to encourage, promote and facilitate
delivery of high quality affordable and sustainable homes providing choice across
tenures that meet diverse housing needs. MLDP Policy DP2 (d) (Housing) requires
that 25% of units are provided for affordable housing. 
It is noted that no affordable units are proposed as part of this development but
that 24 affordable units are consented as part of  application 24/01087/APP
(subject to completion of legal agreement). 
Housing have been consulted as part of this application and no objections have
been raised. It is noted that no affordable housing is required for these proposals
as the affordable housing already approved under Phase 1 meets the
requirements as set out in the adopted Dallas Dhu Masterplan. It is further noted
that Accessible Housing (under DP2(f)) is not applicable as the number of units is
fewer than 10. 
The proposals are therefore deemed to comply with NPF4 Policy 16 and DP2(d)
insofar as the affordable housing requirements have already been met within the
wider Masterplan site. 
8.13 High-pressure Gas Pipeline
As noted under Site Description, the Inverness to Aberdeen High Pressure Gas
Pipeline runs to the north of this site. The HSE does not advise against the granting
of planning permission of this proposal, whilst the pipeline operator (SGN) has
raised no objections to the proposal. An informative note drawing the developer’s
attention to safe working practices is recommended. 
8.14 Zero Waste
NPF4 Policy 12 (Zero Waste) seeks to reduce waste in accordance with the waste
hierarchy. 
Page 37

Page 38

This proposal includes a bin store area for the dwellings to the west of plot 5 and
this will be used to manage general household waste and recycling bins which will
encourage segregation of waste and recycling materials and minimise cross
contamination. On this basis, the requirements of NPF Policy 12 are met. 
Conclusion and Recommendation
This proposal represents a modern interpretation of traditional rural design, which
complies with the aims of the Dallas Dhu Masterplan, as well as the site criteria
for the Forres R6 Dallas Dhu designation. Approval is recommended subject to
conditions, but to withhold issue of consent until developer obligations have been
secured. 
REASON(S) FOR DECISION
The Council’s reason(s) for making this decision are: - 
The development complies with the provisions of the development plan (namely
National Planning Framework 4 and the Moray Local Development Plan 2020), as
well as the adopted Dallas Dhu Masterplan, and there are no material
considerations that indicate otherwise. 
Author/Contact
Officer:
Andrew Miller
Acting Principal Planning Officer
Ext: 01343 563274 
Beverly Smith
Acting Head of Economic Growth and Development 