Agenda Document Pack - Moray Local Review Body - 14/11/2024
Moray Council · 14 November 2024
Back to Moray Local Review Body — 14 November 2024 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Moray Local Review Body Thursday, 14 November 2024 NOTICE IS HEREBY GIVEN that a Meeting of the Moray Local Review Body is to be held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Thursday, 14 November 2024 at 09:30. BUSINESS 1 Sederunt 2 Declaration of Group Decisions and Members Interests * 3 Minute of meeting dated 15 August 2024 5 - 6 4 LR304 - Ward 6 - Elgin City North Planning Application 23/01862/APP – Proposed extension to existing car park at Pinefield Glass, 1 Pinefield Parade, Elgin 7 - 92 5 LR305 - Ward 5 - Heldon and Laich Planning Application 24/00428/PPP – Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston 93 - 216 Summary of Local Review Body functions: To conduct reviews in respect of refusal of planning permission or unacceptable conditions as determined by the delegated officer, in terms of the Scheme of Delegation to Officers under Section 43(A)(i) of the Town & Country Planning (Scotland) Act 1997 and the Town & Country Planning (Scheme of Delegation and Local Review Procedure)(Scotland) Regulations 2013, or where the Delegated Officer has not determined the application within 3 months of registration. Page 1
Page 2
Watching the Meeting You can watch the webcast live by going to: http://www.moray.gov.uk/moray_standard/page_43661.html Webcasts are available to view for 1 year following the meeting. You can also attend the meeting in person, if you wish to do so, please come to the High Street entrance door and a member of staff will be let into the building. Page 2
Page 3
GUIDANCE NOTES * Declaration of Group Decisions and Members Interests - The Chair of the meeting shall seek declarations from any individual or political group at the beginning of a meeting whether any prior decision has been reached on how the individual or members of the group will vote on any item(s) of business on the Agenda, and if so on which item(s). A prior decision shall be one that the individual or the group deems to be mandatory on the individual or the group members such that the individual or the group members will be subject to sanctions should they not vote in accordance with the prior decision. Any such prior decisions will be recorded in the Minute of the meeting. ** Written Questions - Any Member can put one written question about any relevant and competent business within the specified remits not already on the agenda, to the Chair provided it is received by the Proper Officer or Committee Services by 12 noon two working days prior to the day of the meeting. A copy of any written answer provided by the Chair will be published on the Council’s committee management system by 4pm the day before the meeting. The Member who has put the question may, after the answer has been published, ask one supplementary question directly related to the subject matter at the meeting, but no discussion will be allowed. No supplementary question can be put or answered more than 10 minutes after the Council has started on the relevant item of business, except with the consent of the Chair. If a Member does not have the opportunity to put a supplementary question because no time remains, then he or she can submit it in writing to the Proper Officer who will arrange for a written answer to be provided within 7 working days. Page 3
Page 4
MORAY COUNCIL Moray Local Review Body SEDERUNT Councillor Marc Macrae (Chair) Councillor Amber Dunbar (Depute Chair) Councillor Neil Cameron (Member) Councillor Juli Harris (Member) Councillor Paul McBain (Member) Councillor Draeyk van der Horn (Member) Councillor Sonya Warren (Member) Councillor Ben Williams (Member) Clerk Name: Lissa Rowan Clerk Telephone: 07765 741754 Clerk Email: committee.services@moray.gov.uk Page 4
Page 5
MORAY COUNCIL Minute of Meeting of the Moray Local Review Body Thursday, 15 August 2024 Council Chambers, Council Office, High Street, Elgin, IV30 1BX PRESENT Councillor Neil Cameron, Councillor Amber Dunbar, Councillor Juli Harris, Councillor Marc Macrae, Councillor Paul McBain, Councillor Draeyk van der Horn, Councillor Sonya Warren, Councillor Ben Williams IN ATTENDANCE Mrs L MacDonald and Mrs Fiona Olsen, Senior Planning Officers as Planning Advisers, Mr S Hoath, Senior Solicitor as Legal Adviser and Mrs L Rowan, Committee Services Officer as Clerk to the Meeting. 1 Chair Councillor Macrae, being Chair of the Moray Local Review Body, chaired the meeting. 2 Declaration of Group Decisions and Members Interests In terms of Standing Order 21 and 23 and the Councillor's Code of Conduct, there were no declarations from Group Leaders or Spokespersons in regard to any prior decisions taken on how Members will vote on any item on the agenda or any declarations of Members interests in respect of any item on the agenda. 3 Minute of meeting dated 16 May 2024 The Minute of the meeting dated 16 May 2024 was submitted and approved. 4 LR303 - Ward 7 - Elgin City South Planning Application 24/00160/APP – Erect car port 32 Muirfield Road, Elgin, IV30 6DE A request was submitted by the Applicant, seeking a review of the decision of the Appointed Officer, in terms of the Scheme of Delegation, to refuse planning permission on the grounds that: The proposed car port does not comply with the National Planning Framework 4 (NPF4) Policy 14 (Design, Quality and Place) and Policy 16 (Quality Homes) as well as Moray Local Development Plan (MLDP) Policy DP1 (Development Principles) as it would create an incongruous feature on the principal elevation of a mid-terrace house in an area where there are no buildings/structures that sit to the Item 3 Page 5
Page 6
front of houses. The proposal therefore would appear out of place and be detrimental to the established character of the surrounding area. The Summary of Information Report set out the reasons for refusal, including the documents considered or prepared by the Appointed Officer regarding the planning application. It also included the Notice of Review, Grounds for Review and supporting documents submitted by the Applicant. In response to a question from the Chair as to whether the Legal or Planning Advisers had any preliminary matters to raise, both the Legal and Planning Advisers advised that they had nothing to raise at this time. The Chair then asked the Moray Local Review Body (MLRB) if it had sufficient information to determine the request for review. In response, the MLRB unanimously agreed that it had sufficient information to determine the case. The Chair reminded the MLRB of a prior appeal which had been considered relating to a free standing car port and noted that this new appeal related to a car port installation however this time the proposal was to attach it to the house and moved that MLRB uphold the original decision of the Appointed Officer and dismiss the appeal as the proposal does not comply with NPF4 Policy 14 (Design, Quality and Place) and Policy 16 (Quality Homes), as well as MLDP Policy DP1 (Development Principles). Councillor van der Horn seconded this, stating that there was no material difference between this application and the previous one. There being no-one otherwise minded, the MLRB agreed to dismiss the appeal and uphold the original decision of the Appointed Officer to refuse planning permission in respect of Planning Application 24/00160/APP as the proposal does not comply with NPF4 Policy 14 (Design, Quality and Place) and Policy 16 (Quality Homes), as well as MLDP Policy DP1 (Development Principles). Page 6
Page 7
MORAY LOCAL REVIEW BODY 14 NOVEMBER 2024 SUMMARY OF INFORMATION FOR CASE No LR304 Planning Application 23/01862/APP – Proposed extension to existing car park at Pinefield Glass, 1 Pinefield Parade, Elgin Ward 6 – Elgin City North Planning permission in principle was refused under the Statutory Scheme of Delegation by the Appointed Officer on 9 July 2024 on the grounds that: The proposed change of use of designated ENV land to car parking is contrary to Elgin ENV5 East Road MLDP settlement designation, MLDP Policies: MLDP DP1 and EP5, MLDP Open Space Strategy Supplementary Guidance and National Planning Policies NPF Policies 14 and 20 because: The proposed development seeks a crude encroachment into the safeguarded ENV for car parking in a design and form which would erode the purpose and function of the ENV at this prominent access route in the town. Resulting in piecemeal fragmentation and erosion of the overall integrity of the ENV5 East Road Green Corridor as part of the wider green network in Elgin. In these terms the proposal is unacceptable and contrary to the Elgin ENV5 East Road MLDP settlement designation, MLDP Policies: MLDP DP1 and EP5, MLDP Open Space Strategy Supplementary Guidance and National Planning Policies NPF Policies 14 and 20. Documents considered or prepared by the Appointed Officer in respect of the above planning application are attached as Appendix 1. The Notice of the Review, Grounds for Review and any supporting documents submitted by the Applicant are attached as Appendix 2. No Further Representations were received in response to the Notice of Review. Item 4 Page 7
Page 8
Page 8
Page 9
Industrial Pinefield Estate Bridge of Tyock Burn of Tyock Pinefield Apartments 1 to 4 Moravia Apartments 1 to 12 1 to 14 Club El 15 to 28 13 to 28 Shelter Travelling Crane Hotel El Sub Sta Recycling Centre Tenpin Bowling Centre Mast (Telecommunication) Path (um) Public House PINEFIELD PINE Centre PINEFIELD PARADE Sub Sta 11 PINEFIELD CRESCENT Tank 17c 11.3m PERIMETER SPUR DIAGONAL ROAD PARADE SPUR SOUTH EAST ROAD LINKWOOD LANE PARADE SPUR NORTH PERIMETER ROAD 5 4 9 2 6 1 54 18 3 8 38 14 7 58 55 1210 19 15 13 17b 66 72 71 78 52 23 16 37 31 48 47 43 50 44 30 24 57 51 45 17a 49 83 65 LINKWOOD WAY CHANONRY ROAD SOUTH LB 18 3 2 4 3 7 4 5 15 8 El Sub Sta 11 LINKW OOD W AY 5 LB 7 58 1 3 5 7 4 18 6 16 6 1 6 10 5 2 14 6 2 1 5 PINEFIELD PARADE 5 7 4 4 2 PERIMETER ROAD 1 1 14 9 9 1 2 6 8 5 8 12 Planning Application Reference Number: 23/01862/APP LOCATION PLAN This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationary Office Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. (c) Crown Copyright. The Moray Council 100023422 2024 I 1:2,500 Page 9
Page 10
Page 10
Page 11
APPENDIX 1 DOCUMENTS CONSIDERED OR PREPARED BY THE APPOINTED OFFICER Page 11
Page 12
Page 12
Page 13
Page 1 of 7 The Moray Council Council Office High Street Elgin IV30 1BX Tel: 0300 1234561 Email: development.control@moray.gov.uk Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid. Thank you for completing this application form: ONLINE REFERENCE 100648431-001 The online reference is the unique reference for your online form only. The Planning Authority will allocate an Application Number when your form is validated. Please quote this reference if you need to contact the planning Authority about this application. Type of Application What is this application for? Please select one of the following: * Application for planning permission (including changes of use and surface mineral working). Application for planning permission in principle. Further application, (including renewal of planning permission, modification, variation or removal of a planning condition etc) Application for Approval of Matters specified in conditions. Description of Proposal Please describe the proposal including any change of use: * (Max 500 characters) Is this a temporary permission? * Yes No If a change of use is to be included in the proposal has it already taken place? Yes No (Answer ‘No’ if there is no change of use.) * Has the work already been started and/or completed? * No Yes – Started Yes - Completed Applicant or Agent Details Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting on behalf of the applicant in connection with this application) Applicant Agent Proposed extension to existing car park Page 13
Page 14
Page 2 of 7 Agent Details Please enter Agent details Company/Organisation: Ref. Number: You must enter a Building Name or Number, or both: * First Name: * Building Name: Last Name: * Building Number: Address 1 Telephone Number: * (Street): * Extension Number: Address 2: Mobile Number: Town/City: * Fax Number: Country: * Postcode: * Email Address: * Is the applicant an individual or an organisation/corporate entity? * Individual Organisation/Corporate entity Applicant Details Please enter Applicant details Title: You must enter a Building Name or Number, or both: * Other Title: Building Name: First Name: * Building Number: Address 1 Last Name: * (Street): * Company/Organisation Address 2: Telephone Number: * Town/City: * Extension Number: Country: * Mobile Number: Postcode: * Fax Number: Email Address: * S Reid Design Mr Stewart Martin Reid Charlesworth Rothes Pinefield Parade 1 The Sma Glen +447598299753 AB38 7AG IV30 6AG United Kingdom Scotland, UK Aberlour Elgin info@sreiddesign.co.uk mcharlesworth@pinefieldglass.com Pinefield Glass Page 14
Page 15
Page 3 of 7 Site Address Details Planning Authority: Full postal address of the site (including postcode where available): Address 1: Address 2: Address 3: Address 4: Address 5: Town/City/Settlement: Post Code: Please identify/describe the location of the site or sites Northing Easting Pre-Application Discussion Have you discussed your proposal with the planning authority? * Yes No Site Area Please state the site area: Please state the measurement type used: Hectares (ha) Square Metres (sq.m) Existing Use Please describe the current or most recent use: * (Max 500 characters) Access and Parking Are you proposing a new altered vehicle access to or from a public road? * Yes No If Yes please describe and show on your drawings the position of any existing. Altered or new access points, highlighting the changes you propose to make. You should also show existing footpaths and note if there will be any impact on these. 5228.00 Pinefield Glass premises with associated car park Moray Council Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG 862551 323134 Page 15
Page 16
Page 4 of 7 Are you proposing any change to public paths, public rights of way or affecting any public right of access? * Yes No If Yes please show on your drawings the position of any affected areas highlighting the changes you propose to make, including arrangements for continuing or alternative public access. How many vehicle parking spaces (garaging and open parking) currently exist on the application Site? How many vehicle parking spaces (garaging and open parking) do you propose on the site (i.e. the Total of existing and any new spaces or a reduced number of spaces)? * Please show on your drawings the position of existing and proposed parking spaces and identify if these are for the use of particular types of vehicles (e.g. parking for disabled people, coaches, HGV vehicles, cycles spaces). Water Supply and Drainage Arrangements Will your proposal require new or altered water supply or drainage arrangements? * Yes No Do your proposals make provision for sustainable drainage of surface water?? * Yes No (e.g. SUDS arrangements) * Note:- Please include details of SUDS arrangements on your plans Selecting ‘No’ to the above question means that you could be in breach of Environmental legislation. Are you proposing to connect to the public water supply network? * Yes No, using a private water supply No connection required If No, using a private water supply, please show on plans the supply and all works needed to provide it (on or off site). Assessment of Flood Risk Is the site within an area of known risk of flooding? * Yes No Don’t Know If the site is within an area of known risk of flooding you may need to submit a Flood Risk Assessment before your application can be determined. You may wish to contact your Planning Authority or SEPA for advice on what information may be required. Do you think your proposal may increase the flood risk elsewhere? * Yes No Don’t Know Trees Are there any trees on or adjacent to the application site? * Yes No If Yes, please mark on your drawings any trees, known protected trees and their canopy spread close to the proposal site and indicate if any are to be cut back or felled. Waste Storage and Collection Do the plans incorporate areas to store and aid the collection of waste (including recycling)? * Yes No 7 19 Page 16
Page 17
Page 5 of 7 If Yes or No, please provide further details: * (Max 500 characters) Residential Units Including Conversion Does your proposal include new or additional houses and/or flats? * Yes No All Types of Non Housing Development – Proposed New Floorspace Does your proposal alter or create non-residential floorspace? * Yes No Schedule 3 Development Does the proposal involve a form of development listed in Schedule 3 of the Town and Country Yes No Don’t Know Planning (Development Management Procedure (Scotland) Regulations 2013 * If yes, your proposal will additionally have to be advertised in a newspaper circulating in the area of the development. Your planning authority will do this on your behalf but will charge you a fee. Please check the planning authority’s website for advice on the additional fee and add this to your planning fee. If you are unsure whether your proposal involves a form of development listed in Schedule 3, please check the Help Text and Guidance notes before contacting your planning authority. Planning Service Employee/Elected Member Interest Is the applicant, or the applicant’s spouse/partner, either a member of staff within the planning service or an Yes No elected member of the planning authority? * Certificates and Notices CERTIFICATE AND NOTICE UNDER REGULATION 15 – TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE) (SCOTLAND) REGULATION 2013 One Certificate must be completed and submitted along with the application form. This is most usually Certificate A, Form 1, Certificate B, Certificate C or Certificate E. Are you/the applicant the sole owner of ALL the land? * Yes No Is any of the land part of an agricultural holding? * Yes No Certificate Required The following Land Ownership Certificate is required to complete this section of the proposal: Certificate A As existing Page 17
Page 18
Page 6 of 7 Land Ownership Certificate Certificate and Notice under Regulation 15 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Certificate A I hereby certify that – (1) - No person other than myself/the applicant was an owner (Any person who, in respect of any part of the land, is the owner or is the lessee under a lease thereof of which not less than 7 years remain unexpired.) of any part of the land to which the application relates at the beginning of the period of 21 days ending with the date of the accompanying application. (2) - None of the land to which the application relates constitutes or forms part of an agricultural holding Signed: Stewart Reid On behalf of: Pinefield Glass Date: 19/10/2023 Please tick here to certify this Certificate. * Checklist – Application for Planning Permission Town and Country Planning (Scotland) Act 1997 The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Please take a few moments to complete the following checklist in order to ensure that you have provided all the necessary information in support of your application. Failure to submit sufficient information with your application may result in your application being deemed invalid. The planning authority will not start processing your application until it is valid. a) If this is a further application where there is a variation of conditions attached to a previous consent, have you provided a statement to that effect? * Yes No Not applicable to this application b) If this is an application for planning permission or planning permission in principal where there is a crown interest in the land, have you provided a statement to that effect? * Yes No Not applicable to this application c) If this is an application for planning permission, planning permission in principle or a further application and the application is for development belonging to the categories of national or major development (other than one under Section 42 of the planning Act), have you provided a Pre-Application Consultation Report? * Yes No Not applicable to this application Town and Country Planning (Scotland) Act 1997 The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 d) If this is an application for planning permission and the application relates to development belonging to the categories of national or major developments and you do not benefit from exemption under Regulation 13 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013, have you provided a Design and Access Statement? * Yes No Not applicable to this application e) If this is an application for planning permission and relates to development belonging to the category of local developments (subject to regulation 13. (2) and (3) of the Development Management Procedure (Scotland) Regulations 2013) have you provided a Design Statement? * Yes No Not applicable to this application f) If your application relates to installation of an antenna to be employed in an electronic communication network, have you provided an ICNIRP Declaration? * Yes No Not applicable to this application Page 18
Page 19
Page 7 of 7 g) If this is an application for planning permission, planning permission in principle, an application for approval of matters specified in conditions or an application for mineral development, have you provided any other plans or drawings as necessary: Site Layout Plan or Block plan. Elevations. Floor plans. Cross sections. Roof plan. Master Plan/Framework Plan. Landscape plan. Photographs and/or photomontages. Other. If Other, please specify: * (Max 500 characters) Provide copies of the following documents if applicable: A copy of an Environmental Statement. * Yes N/A A Design Statement or Design and Access Statement. * Yes N/A A Flood Risk Assessment. * Yes N/A A Drainage Impact Assessment (including proposals for Sustainable Drainage Systems). * Yes N/A Drainage/SUDS layout. * Yes N/A A Transport Assessment or Travel Plan Yes N/A Contaminated Land Assessment. * Yes N/A Habitat Survey. * Yes N/A A Processing Agreement. * Yes N/A Other Statements (please specify). (Max 500 characters) Declare – For Application to Planning Authority I, the applicant/agent certify that this is an application to the planning authority as described in this form. The accompanying Plans/drawings and additional information are provided as a part of this application. Declaration Name: Mr Stewart Reid Declaration Date: 19/10/2023 I include a Mabbett drainage report and a Supporting Statement. Page 19
Page 20
Page 20
Page 21
1:2500 (A4) SCALEDATE OCT 2023 OS LOCATIONPLAN (1:2500) S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.uk Proposed extension of car park at Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG Page 21
Page 22
Page 22
Page 23
S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.uk SEP 2023 DATE SCALE AS STATED (A2) DRG. NO. PINEFIELD / SP / 01 Proposed extension to existing car park at Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG P i n e f i e l d G l a s s, E l g i n P i n e f i e l d G l a s s, E l g i n EV CHARGING STATION WITH 2 TETHERED CONNECTORS CAPABLE OF DELIVERING A MINIMUM POWER OUTPUT OF 150kw. EV RED OUTLINE DENOTES EXTENT OF OW NERSHIP / APPLICATION BOUNDARY. M H M H BT PINEFIELD GLASS EV Plan (scale 1:500) Site E A S T R O A D HIGHLAND INDUSTRIAL SUPPLIES PINEFIELD PARADE PREMIER INN VARIOUS UNITS PENTLAND (LAND ROVER) TO ABERDEEN HIGHLAND GALVANIZERS PERIMETER ROAD FORMER CAR DISPLAY AREA GRASS VERGE NEW CAR PARK AREA 1211109 8 7 6 12109 EXISTING CAR PARK ENTRANCE 123 45 12.36 12.68 12.73 12.82 12.98 13.20 13.4113.29 13.36 13.05 12.89 12.86 12.76 12.73 12.60 12.60 12.39 12.30 13.25 13.22 12.64 12.63 12.80 13.63 13.82 13.79 13.01 13.01 12.89 13.05 12.89 12.51 13.14 13.25 14.07 13.64 12.87 12.66 13.03 13.73 13.68 13.68 13.48 13.63 13.64 13.71 MH MH BT EV E A S T R O A D 1 GRASS VERGE NEW CAR PARK AREA 2 3 4 5 1211109 8 7 6 FOOTPATH ENTRANCE PINEFIELD PARADE PERMEABLE PAVING TO ACT AS SOAKAWAY PERMEABLE PAVING TO ACT AS SOAKAWAY NEW EXTENSION 6800 1600 Surface water run-off to fall to north west corner of site and to permeate through permeable paving. All drainage works to be carried in accordance with Mabbe4 report / design - ref 313889 D R A I N A G E Carpark Plan8ng / Biodiversity enhancement - New trees are to be planted out which will consist of a mixture of Birch, Larch, Rowan, Hazel, Willow and cherry trees at spacings denoted. All new trees to be at least half standard (approx 1.5m in height). All plan8ng, seeding or turfing shall be carried out in the first plan8ng and seeding seasons following the comple8on of development. Any trees or plants which within a period of five years from the comple8on of the development die, for whatever reason are removed or damaged shall be replaced in the next plan8ng season with others of the same size and species. L A N D S C A P E W O R K S Birch (150cm min). Larch (150cm min). Rowan (150cm min). Hazel (150cm min). W illow (150cm min). Cherry (150cm min). C A R P A R K B I O D I V E R S I T Y L E G E N D - Plan (scale 1:250) Site Holly Hedge (150cm min). Laurel Hedge (150cm min). C A R P A R K B I O D I V E R S I T Y L E G E N D - Page 23
Page 24
Page 24
Page 25
MH EV 1 NEW CAR PARK AREA 12.57 12.681 2 .6 6 12.65 12. 68 1 2 . 6 71 2 . 7 3 13.20 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.79 12.89 13.05 12.89 13.78 13.73 12.51 12.83 13.14 13.25 12.87 12.66 13.03 13.68 MH Herras Fencing 13.00m12.85m 12.85m 12.90m 13.20m 13.50m 80mm Premeable BlockBlock Paving 50mm bedding min 375mm granular base Permeable geotextyle Kerbing Permeable Paving Construction Detail DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date Willow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn JF 2/10/23 PL01 X 313889 A3 GMNTS Issue Testhole Location Proposed Layout/ Pinefield Parade, Elgin Pinefield Glass Ltd Proposed Parking Extension Pinefield Glass Ltd - - - - Fall Arrows Test Hole Permeable Paving Permeable Paving Page 25
Page 26
Page 26
Page 27
862500N 862500N 862600N 862600N 323050E323050E 323200E323200E 12.36 12.57 12.6812.66 12.65 12.68 12.6712.7312.7712.7912.82 12.82 12.86 12.98 13.00 13.20 13.41 13.58 13.68 13.75 13.80 13.93 14.89 15.19 15.19 14.78 14.38 14.09 13.91 13.89 13.84 13.78 13.74 13.54 13.49 13.40 13.29 13.36 13.05 12.89 12.89 12.86 12.76 12.75 12.73 12.63 12.60 12.55 12.5912.60 12.39 12.30 15.16 14.82 14.62 14.53 14.41 14.19 14.12 13.94 13.84 13.68 13.91 14.35 14.87 15.38 15.84 16.06 16.22 14.45 14.36 13.86 16.05 15.97 16.01 16.07 16.26 16.40 16.36 16.07 16.1015.90 15.3615.3915.3415.31 14.72 14.62 14.73 14.76 14.92 14.6114.53 13.25 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.63 13.82 13.79 13.01 13.01 12.89 13.05 12.89 16.4016.34 16.38 16.16 15.65 15.22 14.84 14.54 13.78 13.73 12.51 12.83 13.14 13.25 14.07 14.56 15.07 15.10 15.65 15.70 15.46 13.64 14.34 12.87 12.66 13.03 13.92 13.73 13.78 13.72 13.96 13.81 13.68 13.68 13.60 13.48 13.63 13.64 13.71 15.0 15.0 12.5 MH MHBT Herras Fencing DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date W illow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn GM 7/09/23 SU001 X 313889 A3 SP1:500 Issue Topographic Survey Elgin Pinefield Glass Proposed Car Park Extension Pinefield Glass - - - - north 50 0 20 10 30 40 Scale 1:500 (metres) Page 27
Page 28
Page 28
Page 29
JAN 2024 DATE SCALE 1:500 (A3) DRG. NO. PINEFIELD / EXIST S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.uk Proposed extension to existing car park at Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG P i n e f i e l d G l a s s, E l g i n P i n e f i e l d G l a s s, E l g i n RED OUTLINE DENOTES EXTENT OF OW NERSHIP / APPLICATION BOUNDARY. M H M H BT PINEFIELD GLASS E A S T R O A D HIGHLAND INDUSTRIAL SUPPLIES PINEFIELD PARADE VARIOUS UNITS TO ABERDEEN PERIMETER ROAD FORMER CAR DISPLAY AREA EXISTING CAR PARK (24 SPACES) ENTRANCE Page 29
Page 30
Page 30
Page 31
Mabbett & Associates Ltd, Corporate and Registered Office: 13 Henderson Road, Inverness, UK, IV1 1SN Registered in Scotland No: SC 163378 info@mabbett.eu www.mabbett.eu Belfast | Cardiff | Dublin | Dundee | Edinburgh | Glasgow | Inverness | Leicester | Liverpool © 2023, Mabbett & Associates Ltd. All Rights Reserved. The name Mabbett and the Mabbett logo are Trade Marks licensed to Mabbett & Associates Ltd. Memorandum Report 10th October 2023 TO: Stuart Reid, S Reid Design FM: Gary Mackintosh CC: Pinefield Glass RE: 313889 ___________________________________________________________________________________ 1.0 Introduction Mabbett & Associates Ltd (Mabbett) was commissioned by Pinefield Glass to provide a drainage design for a proposed car park extension located at Pinefield Glass, Pinefield Parade, Elgin. The SEPA Flood Maps have been consulted prior to commencement which confirm that the proposed parking extension lies out with any areas of fluvial and pluvial flooding during a 1:200year event. 1.1 Proposal/Existing Ground Conditions Excavations were carried out on 17th January 2023 in order to assess the soils for the use of infiltration as a method of surface water management. The trial pits were excavated to a depth of 1.8m and the existing soils consisted of 400mm Topsoil, dark brown, medium fine slightly gravelly Sands to a depth of 1200mmbgl overlying brown medium to loose, fine, slightly gravelly Sands proved to the depth of the excavations. Infiltration testing was carried out in full accordance with BRE digest 365. The results can be found in Table 2 below. Table 2 Infiltration Pit Dimensions Test Zone Infiltration Test Hole No (w/l) (mgbl) Rate (m/s) INF01 0.8m x 1.2m 1.1m -1.7m 5.921 x 10-5 In addition to the ground investigation, a topographic survey was carried out within the site to establish existing and proposed levels. Based on the site topography and the test results obtained, it is proposed to install permeable paving to the northwest and west of the proposed parking area as indicated within the enclosed drawing within which the proposed levels and construction for the permeable paving are shown. Page 31
Page 32
Page 32
Page 33
MH EV 1 NEW CARPARKAREA 12.57 12.6812.66 12.65 12.68 12.6712.73 13.20 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.79 12.89 13.05 12.89 13.78 13.73 12.51 12.83 13.14 13.25 12.87 12.66 13.03 13.68 MH Herras Fencing 13.00m12.85m 12.85m 12.90m 13.20m 13.50m 80mm Premeable BlockBlock Paving 50mm bedding min 375mm granular base Permeable geotextyle Kerbing Permeable Paving Construction Detail DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date W illow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.m abbett.eu Description Date Rev. Drawn JF 2/10/23 PL01 X 313889 A3 GMNTS Issue Testhole Location Proposed Layout/ Pinefield Parade, Elgin Pinefield Glass Ltd Proposed Parking Extension Pinefield Glass Ltd - - - - FallArrows TestHole PermeablePaving PermeablePaving Page 33
Page 34
Page 34
Page 35
MasterDrain Company Project Item Job Ref Sheet no. Calc. by Date Checked by Date Approved by Date Mabbett & Associates Pinefield Glass, Elgin Permeable Paving Calculations 3113889 1 GM 02/10/23 Data:- FSR Hydrology:- Location = ELGIN Grid reference = NJ2162 M5-60 (mm) = 14 r = 0.24 Soil index = 0.40 SAAR (mm/yr) = 800 Return period = 200 WRAP = 3 i) Relatively impermeable soils in boulder and sedimentary clays, and in alluvium, especially in eastern England; ii) Permeable soils with shallow ground water in low-lying areas; iii) Mixed areas of permeable and impermeable soils, in approximately equal proportions. Design data:- Total drained area = 400 m² Perm. pavior area = 90 m² Storm duration = 6.00 hrs Climate change factor = 1.42 Inf. coefficient = 0.1850 m/hr % Voids = 30.0% Saturation depth = 80.0 % Runoff factor = 95% Calculated data:- Mean rain intensity = 14.3 mm/hr @ 200yrs/6hrs with 1.42 climate change factor Total rainfall volume = 34.358 m³. Total runoff volume = 32.640 m³. Mean discharge rate = 4.625 l/s. Infiltration volume = 99.900 m³. Infiltration volume exceeds the total runoff volume. Minimal storage is required, therefore a minimum construction thickness of 375mm should be used. Storm profile used = Summer Page 35
Page 36
Consultee Comments for Planning Application 23/01862/APP Application Summary Application Number: 23/01862/APP Address: 1 Pinefield Parade Elgin Moray IV30 6AG Proposal: Proposed extension to existing car park at Case Officer: Shona Strachan Consultee Details Name: Mr CL Consultations Address: Environmental Health, Council Offices, High Street Elgin, Moray IV30 1BX Email: Not Available On Behalf Of: Contaminated Land Comments Approved unconditionally - Adrian Muscutt Page 36
Page 37
From: Young, Bryan on behalf of Plant Protection And Pipelines North Sent: Tue, 31 Oct 2023 12:44:56 +0000 To: Planning Consultation Cc: MBX_PlantProtection_ScNorthElgin Subject: FW: Moray Council Planning Application Consultation for 23/01862/APP Attachments: ufm42_EOTH_E-consultation_-_Others.rtf, Moray.jpg **************************************** Warning. This email contains one or more attachments and originates from outside of the Moray Council network. You should only open these attachments if you are certain that the email is genuine and the content is safe. **************************************** **************************************** Warning. This email contains web links and originates from outside of the Moray Council network. You should only click on these links if you are certain that the email is genuine and the content is safe. **************************************** Classified as Internal Good afternoon, SGN would have no objection to the planning consultation from a High Pressure stand point as there is no assets in the vicinity of the work area. There is however Intermediate/Medium/Low Pressure pipelines within the proposed area I have Cc'd in the relevant department for comment Kind regards Bryan Young Pipeline Officer Bryan.young@sgn.co.uk Axis House Edinburgh sgn.co.uk Find us on Facebook and follow us on Twitter: @SGNgas Smell gas? Call 0800 111 999 Find out how to protect your home from carbon monoxide -----Original Message----- From: consultation.planning@moray.gov.uk <consultation.planning@moray.gov.uk> Sent: 31 October 2023 11:31 To: Plant Protection And Pipelines North <PlantProtectionAndPipelinesNorth@sgn.co.uk> Subject: Moray Council Planning Application Consultation for 23/01862/APP WARNING This email is not from the SGN network. Do not open unexpected files or links. Please find attached notification of consultation This email is confidential and may be legally privileged. It is intended solely for the addressees and access to this email by anyone else is unauthorised. If you are not the intended recipient, please immediately notify the sender of the error in transmission and then delete this email. Please note that any Page 37
Page 38
disclosure, copying, distribution is prohibited and may be unlawful. Unless specifically stated otherwise, emails and attachments are neither an offer capable of acceptance nor acceptance of an offer and do not form part of a binding contractual agreement. Emails may not represent the views of SGN. Please be aware, we may monitor email traffic data and content for security and staff training. For further information about what we do with your personal data, and your rights in relation to the same, please see the Privacy Notice<https://www.sgn.co.uk/privacy-policy> published on our website SGN is a registered trade mark and is the brand name for the companies with this Scotia Gas Networks group of companies. Scotia Gas Networks Limited (company registration number 04958135) and all of its subsidiaries, except for Scotland Gas Networks plc are registered in England and Wales and have their registered office address at St Lawrence House, Station Approach, Horley, Surrey RH6 9HJ. Scotland Gas Networks plc (company registration number SC264065) is registered in Scotland and has its registered office address at Axis House, 5 Lonehead Drive, Newbridge, Edinburgh EH28 8TG Page 38
Page 39
Transport Scotland Roads Directorate Network Operations - Development Management Response On Development Affecting Trunk Roads and Special Roads To: The Moray Council Council Reference:- 23/01862/APP TS Reference:- NE/235/2023 The Town and Country Planning (Scotland) Act 1997 The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 S.I.2013 No 155 (S.25) Town and Country Planning (Notification of Applications) (Scotland) Direction 2009 Application made by Pinefield Glass per S Reid Design The Sma Glen Rothes Aberlour Moray AB38 7AG and received by Transport Scotland on 01/11/2023 for planning permission for Proposed extension to existing car park located at 1 Pinefield Parade Elgin Moray affecting the A96 Trunk Road. To obtain permission to work within the trunk road boundary, contact the Route Manager through the general contact number below. The Operating Company has responsibility for co-ordination and supervision of works and after permission has been granted it is the developer's contractor's responsibility to liaise with the Operating Company during the construction period to ensure all necessary permissions are obtained. Director, Trunk Roads Network Management Advice 1. The Director does not propose to advise against the granting of permission 2. The Director advises that planning permission be refused (see overleaf for reasons). 3. The Director advises that the conditions shown overleaf be attached to any permission the council may give (see overleaf for reasons). TS Contact:- Area Manager (A96) 0141 272 7100 Transport Scotland, 2nd Floor, George House, 36 North Hanover St, Glasgow G1 2AD Operating Company:- North East Address:- Amey, Caledonian House, West Kinfauns, Perth Telephone Number:- Not Available e-mail address:- occr-northeast@amey.co.uk Page 1 of 2 Page 39
Page 40
Transport Scotland Roads Directorate Network Operations - Development Management Response On Development Affecting Trunk Roads and Special Roads NB - Planning etc. (Scotland) Act 2006 Planning Authorities are requested to provide Transport Scotland, Roads Directorate, Network Operations - Development Management with a copy of the decision notice, and notify Transport Scotland, Trunk Roads Directorate if the recommended advice is not accepted. CONDITIONS to be attached to any permission the council may give:- 1 Prior to commencement of the development, details of the frontage landscaping treatment along the trunk road boundary shall be submitted to, and approved by, the Planning Authority, after consultation with Transport Scotland. 2 Prior to commencement of the development, details of the EV charging point along the trunk road boundary shall be submitted to, and approved by, the Planning Authority, after consultation with Transport Scotland. REASON(S) for Conditions (numbered as above):- 1 and 2 To ensure that there will be no distraction to drivers on the Trunk Road and that the safety of the traffic on the Trunk Road will not be diminished. Transport Scotland Response Date:- 29/04/2024 Transport Scotland Contact:- Iain Clement Transport Scotland Contact Details:- Roads - Development Management Transport Scotland, 2nd Floor, George House, 36 North Hanover St, Glasgow G1 2AD Telephone Number: 0141 272 7100 e-mail: development_management@transport.gov.scot NOTES This response supersedes our consultation response dated 07/11/2023. Page 2 of 2 Page 40
Page 41
Consultee Comments for Planning Application 23/01862/APP Application Summary Application Number: 23/01862/APP Address: 1 Pinefield Parade Elgin Moray IV30 6AG Proposal: Proposed extension to existing car park at Case Officer: Shona Strachan Consultee Details Name: Mr EH Consultations Address: Environmental Health, Council Offices, High Street Elgin, Moray IV30 1BX Email: Not Available On Behalf Of: Environmental Health C12 Comments Approved unconditionally - Andrew Stewart Page 41
Page 42
Page 42
Page 43
MORAY COUNCIL PLANNING CONSULTATION RESPONSE From: The Moray Council, Flood Risk Management Planning Application Ref. No: 23/01862/APP I have the following comments to make on the application:- Please x (a) I OBJECT to the application for the reason(s) as stated below (b) I have NO OBJECTIONS to the application and have no condition(s) and/or comment(s) to make on the proposal (c) I have NO OBJECTIONS to the application subject to condition(s) and/or comment(s) about the proposal as set out below (d) Further information is required in order to consider the application as set out below Contact: Leigh Moreton Date 01/11/23 email address: Leigh.moreton@moray.gov.uk Phone No 07815 647384 Consultee: The Moray Council, Flood Risk Management Page 43
Page 44
From: Susie Simpson <Susie.Simpson@moray.gov.uk> Sent: 09 Feb 2024 11:18:58 To: DMSMyEmail@moray.gov.uk Cc: Subject: FW: 23/01862/APP Attachments: Susie Simpson| Clerical Assistant/WPO | Economic Growth and Development susie.simpson@moray.gov.uk | website | facebook | twitter | instagram | news 01343 563092 | 07929784965 From: Darren Westmacott <Darren.Westmacott@moray.gov.uk> Sent: Friday, February 9, 2024 10:50 AM To: Planning Consultation <consultation.planning@moray.gov.uk> Cc: Shona Strachan <Shona.Strachan@moray.gov.uk> Subject: 23/01862/APP Good morning, The revised proposals for landscaping are considered acceptable and will help mitigate the impact of development. However, the proposal will result in the loss of designated open space and is a departure from NPF4 Policy 20 Blue and green infrastructure and MLDP Policy EP5 Open Space & Elgin ENV5 East Road. Regards, Darren Darren Westmacott | Planning Officer (Strategic Planning & Development) | Economic Growth & Development darren.westmacott@moray.gov.uk | website | facebook | instagram | news 01343 563358 | 07929 751481 Working Pattern | Mon (Home) | Tues (Home) | Wed (Office – HQ Rm 207a) | Thurs (Office – HQ Rm 207a) | Fri (Home / Non-Working Day (Alt.)) Page 44
Page 45
Re-consultation Request Notification Planning Authority Name Moray Council Response Date 23rd April 2024 Planning Authority Reference 23/01862/APP Nature of Proposal (Description) Proposed extension to existing car park at Site 1 Pinefield Parade Elgin Moray IV30 6AG Site Postcode N/A Site Gazetteer UPRN 000133038092 Proposal Location Easting 323137 Proposal Location Northing 862546 Area of application site (M2) 5228 Additional Comments Development Hierarchy Level LOCAL Supporting Documentation URL https://publicaccess.moray.gov.uk/eplanning/ce ntralDistribution.do?caseType=Application&ke yVal=S2TCPKBGKH300 Previous Application 22/00292/APP 14/00785/APP 98/01099/FUL Date of Consultation 9th April 2024 Is this a re-consultation of an existing application? Yes Applicant Name Pinefield Glass Applicant Organisation Name Applicant Address 1 Pinefield Parade Elgin Moray IV30 6AG Agent Name S Reid Design Agent Organisation Name Agent Address The Sma Glen Rothes Aberlour Moray AB38 7AG Agent Phone Number Agent Email Address N/A Case Officer Shona Strachan Case Officer Phone number 01343 563303 Case Officer email address shona.strachan@moray.gov.uk Page 45
Page 46
PA Response To consultation.planning@moray.gov.uk NOTE: If you do not respond by the response date, it will be assumed that you have no comment to make. The statutory period allowed for a consultation response is 14 days. Due to scheduling pressures if a definitive response is not received within 21 days this may well cause the two month determination period to be exceeded. Data Protection - Moray Council is the data controller for this process. Information collected about you on this form will be used to process your Planning Application, and the Council has a duty to process your information fairly. Information we hold must be accurate, up to date, is kept only for as long as is necessary and is otherwise shared only where we are legally obliged to do so. You have a legal right to obtain details of the information that we hold about you. For full terms please visit http://www.moray.gov.uk/moray_standard/page_121513.html For full Data Protection policy, information and rights please see http://www.moray.gov.uk/moray_standard/page_119859.html You can contact our Data Protection Officer at info@moray.gov.uk or 01343 562633 for more information. Please respond using the attached form:- Page 46
Page 47
MORAY COUNCIL PLANNING CONSULTATION RESPONSE From: Transportation Manager Planning Application Ref. No: 23/01862/APP Proposed extension to existing car park at 1 Pinefield Parade Elgin Moray IV30 6AG for Pinefield Glass I have the following comments to make on the application:- Please (a) I OBJECT to the application for the reason(s) as stated below ❑ (b) I have NO OBJECTIONS to the application and have no condition(s) and/or comment(s) to make on the proposal ❑ (c) I have NO OBJECTIONS to the application subject to condition(s) and/or comment(s) about the proposal as set out below x (d) Further information is required in order to consider the application as set out below ❑ This proposal is for the re-consultation for an extension to an existing private car park to be served via an existing access, and is associated with a recently completed office extension (22/00292/APP relates). It is noted that the previous consent for the office extension required improvements to the visibility splays (cutting back/ removal of an existing hedge). At the time of the site visit for this proposal the visibility improvements had not yet been undertaken, and therefore the condition has been repeated. The developer should note that an existing “Pinefield Industrial Estate” sign will require to be relocated to accommodate the proposed car park extension. For clarity all costs associated with the relocation of the sign shall be borne by the developer. The proposed works are located in close proximity to a remote footway which falls under the remit of Transport Scotland as Trunk Roads Authority. It is noted that Transport Scotland was previously consulted on the original proposal. However, it would be recommended that Transport Scotland be re-consulted on this revised proposal particularly as the formation of the new car parking spaces adjacent to the recently completed extension would appear to require a fairly significant quantity of upfill of material to make level. Additionally, although as per the previously submitted layout the proposed Electric Vehicle charging infrastructure (space 7) is located in very close proximity to the rear of the remote footway. The following conditions would apply: Condition(s) 1. Prior to the first occupation/use of the car park extension, works shall take place to ensure that for the lifetime of the development no boundary fences, hedges, walls or any other obstruction whatsoever over 0.9m in height and fronting onto the U171E Pinefield Parade shall be within 2.4m of the edge of the public carriageway. Reason: To enable drivers of vehicles entering or exiting the site to have a clear view so that they can undertake the manoeuvre safely and with the minimum interference to the safety and free flow of traffic on the public road. Page 47
Page 48
2. No water shall be permitted to drain or loose material be carried onto the public footway/carriageway. Reason: To ensure the safety and free flow of traffic on the public road and access to the site by minimising the road safety impact from extraneous material and surface water in the vicinity of the new access 3. A turning area shall be retained within the curtilage of the site to enable vehicles to enter and exit in a forward gear. Reason: To ensure the provision for vehicles to enter/exit in a forward gear in the interests of the safety and free flow of traffic on the public road Further comment(s) to be passed to applicant Planning consent does not carry with it the right to carry out works within the public road boundary. The formation of the required visibility splays will require the cutting back and ongoing maintenance of the existing hedge/ vegetation located along the site frontage. At the time of the site visit a large steel trailer was sitting just within the south west corner of the site and was obstructing the visibility for vehicles exiting Pinefield Crescent loop onto Pinefield Parade and should be removed/ re-located accordingly. An existing “Pinefield Industrial Estate” sign will require to be repositioned as a result of the proposed car park extension. The sign shall be relocated at the expense of the developer. Advice on this matter can be obtained by emailing Moray Council Estates department at estates@moray.gov.uk Public utility apparatus may be affected by this proposal. Contact the appropriate utility service in respect of any necessary utility service alterations which have to be carried out at the expense of the developer. No building materials/scaffolding/builder’s skip shall obstruct the public road (including footpaths) without permission from the Roads Authority. Contact: AG Date 18 April 2024 email address: transport.develop@moray.gov.uk Consultee: TRANSPORTATION Return response to consultation.planning@moray.gov.uk Please note that information about the application including consultation responses and representations (whether in support or objection) received on the proposal will be published on the Council’s website at http://publicaccess.moray.gov.uk/eplanning/ (You can also use this site to track progress of the application and view details of any consultation responses and representations (whether in support or objection) received on the proposal). In order to comply with the Data Protection Act, personal information including signatures, personal telephone and email details will be removed prior to publication using “redaction” software to avoid (or mask) the display of such information. Where appropriate other “sensitive” information within documents will also be removed prior to publication online. Page 48
Page 49
REPORT OF HANDLING Ref No: 23/01862/APP Officer: Shona Strachan Proposal Description/ Address Proposed extension to existing car park at 1 Pinefield Parade Elgin Moray IV30 6AG Date: 05/06/2024 Typist Initials: DJP RECOMMENDATION Approve, without or with condition(s) listed below N Refuse, subject to reason(s) listed below Y Legal Agreement required e.g. S,75 N Notification to Scottish Ministers/Historic Scotland N Hearing requirements Departure N Pre-determination N CONSULTATIONS Consultee Date Returned Summary of Response Contaminated Land 07/11/23 No objection Moray Flood Risk Management 01/11/23 No objection Environmental Health Manager 31/10/23 No objection Scotland Gas Networks Ltd 06/11/23 No objection Strategic Planning And Development 09/02/24 Response recognises the proposed use of landscaping to seek to mitigate the impact of the development. However, the proposal will result in the loss of designated open space and is a departure from NPF4 Policy 20 Blue and green infrastructure and MLDP Policy EP5 Open Space & Elgin ENV5 East Road. Transportation Manager 18/04/24 No objection subject to conditions and informative advice. The conditions would require height restriction for any features within 2.4m of the edge of the carriageway; Acceptable roads drainage and a turning area to be retained at all times within the site. Transport Scotland 29/04/24 No objection subject to conditions which prior to the commencement of any works on the site would require details of the frontage landscape treatment and any EV charging infrastructure. Page 49
Page 50
Page 2 of 7 DEVELOPMENT PLAN POLICY Policies Dep Any Comments (or refer to Observations below) NPF20 - Blue and green infrastructure Y See observations EP5 Open Space Y See observations Elgin ENV5 - Green Corridor Y See observations NPF1 - Tackling the Climate N NPF2 - Climate mitigation and adaptation N NPF3 - Biodiversity N NPF5 - Soils N NPF13 - Sustainable transport N NPF14 - Design, quality and place Y See observations DP1 Development Principles Y See observations EP12 Management and Enhancement Water N NPF22 - Flood risk N REPRESENTATIONS Representations Received NO Total number of representations received Names/Addresses of parties submitting representations Summary and Assessment of main issues raised by representations Issue: Comments (PO): OBSERVATIONS – ASSESSMENT OF PROPOSAL Legislative Framework Section 25 of the 1997 Act as amended requires planning applications to be determined in accordance with the Development Plan i.e. the adopted National Planning Framework 4 (NPF4) and Moral Local Development Plan 2020 (MLDP) unless material considerations indicate otherwise. The main planning issues are considered below: Proposal Planning permission is sought for the proposed extension to an existing car park at Pinefield Glass 1 Pinefield Parade, Elgin. Pinefield Glass currently has a car park to the south of the premises which provides car parking spaces for 14 cars, and, a car park located to the west of the premises accessed of Pinefield Parade which provides 24 car parking spaces and is also where existing loading and deliveries take place. A site inspection report (Safe Hands) has highlighted that there is currently little to no segregation in parking between the loading/unloading area and parking for general public which both take place in Page 50
Page 51
Page 3 of 7 the existing (west) car park. In order to address the lack of segregation in parking, the proposals are to install an additional parking area. The proposed car park is to adjoin the existing (west) car park to the north and would provide for 12 car parking spaces, landscaping (hedgerows and mixed trees) and EV charging. Spaces 6-12 would have permeable paving to act as the soakaway for the additional parking area. The layout of the existing (west) car park is to be amended to provide delineation for customer parking and loading/deliveries only. Site Pinefield Glass is an existing established business located at the Pinefield Industrial Estate (I5 MLDP Designation). The land to the north of the site which is the location of the proposed car park extension is designated as ENV5 East Road Green Corridor, the public footpath and the A96 Trunk is located beyond. The ENV5 East Road Green Corridor is a safeguarded area of open space designated at either side of the Trunk Road to improve the amenity and visual appearance of this main gateway access through Elgin taking account of the mixed uses and designs along this locality many of which are more industrialised in nature and appearance. Planning History Application 22/00292/APP which sought an office extension located on the ENV5 East Road Green Corridor was permitted as an acceptable departure on the grounds that the proposed development was a particularly small scale low impact extension to the existing premises and was considered to contribute job creation/retention. Policy Assessment Siting and Impact of the Development • MLDP Settlement Designation: Elgin ENV5 East Road • MLDP Policies: MLDP DP1 and EP5 • MLDP Guidance Open Space Strategy Supplementary Guidance • National Planning Policies NPF Policies 14 and 20 MLDP Settlement Designation Elgin ENV5 East Road: The supporting settlement text advises that open space that contributes to the environmental amenity of Elgin will be safeguarded from development that is not related to its current ENV use. MLDP Policy DP1: states that the scale, density and character must be appropriate to the surrounding area, contributing to the sense of place and connect to existing open space as per the requirements of Policy EP5. MLDP Policy EP5: states that development which would result in a change of use of an ENV designation to anything other than an open space use will be refused. The Moray Open Space Strategy: Definition of a green corridor; A green corridor links different areas within a town as part of designated and managed network. The ENV designation and the site is coded as EL/0S/008 East Road under the Open Space Strategy. The East Road Green Corridor is described as landscaping at the edge of the Trunk Road on the entrance to Elgin. Planting and trees soften the visual impacts of the industrial areas and make the route more attractive for pedestrians. The Moray Open Space Strategy advises that there are no development opportunities on the ENV5 East Road Green Corridor. NPF4 Policy 14: requires development proposals be designed to improve the quality of an area Page 51
Page 52
Page 4 of 7 whether in urban or rural locations and regardless of scale. It also states that development proposals will be supported where they are consistent with the six qualities of successful places; Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable. Finally, NPF Policy 14 states that proposals which are poorly designed, detrimental to the amenity of the surrounding area or inconsistent with the six qualities of successful places will not be supported. NPF4 Policy 20: states that development proposals that result in fragmentation or net loss of existing blue and green infrastructure will only be supported where it can be demonstrated that the proposal would not result in or exacerbate a deficit in blue or green infrastructure provision, and the overall integrity of the network will be maintained. It is also advised that the Planning Authorities Open Space Strategy should inform this. In this case, the proposed car park extension is to be located wholly within the Elgin ENV5 East Road designation and proposes to change the site from its existing ENV designation to car parking. This change of use is not supported by the site designation or the aforementioned local and national policies. The site has a prominent roadside location in a safeguarded green corridor which has been designated under successive local plans to mitigate the physical and visual impacts of the industrial areas along this location, and, improve the amenity and appearance of this access route through Elgin which forms part of the main eastern approach to the town. The green corridor also serves to encourage pedestrian use by making the route more attractive for their use and forms part of a wider network of green spaces within the town as promoted by the principles of good placemaking. The proposal seeks a crude encroachment into the safeguarded ENV for car parking in a form and design which would completely erode the purpose and function of the ENV at this prominent location resulting in piecemeal fragmentation and erosion of the overall integrity of the ENV5 East Road Green Corridor as part of the wider green network in the town. Whilst the supporting information provided as part of the proposal is acknowledged, this must be balanced against the wider public benefits of the purpose and function of the ENV5 East Road Green Corridor as designated in the MLDP. Unfortunately, despite several requests from the Planning Authority no attempt to minimise land take, reconfigure the design of the proposal and or rationalise existing car park use and traffic management across the site has been made. Options to reduce parking demand across the site could have also been explored via car share options for staff and or deliveries management plan for example as these approaches would have helped to reduce the proposed land take associated with the proposal. This is unfortunate given the known ENV designation and the potential to significantly reduce the impacts of the proposal on the ENV these options to revise and reduce the proposal may have offered. The use of native hedging and tree planting to help screen the proposed development is also acknowledged but this in itself does not justify the land take and erosion of the safeguard ENV in which is it stated that there are no development opportunities as per the designation and local and national policy provisions. Set against this context, the proposal is contrary to site designation ENV5 East Road Green Corridor MLDP Policies DP1 & EP5, The Moray Open Space Planning Guidance, and, National Planning Framework Policies NPF 14 and 20 and will be refused. Access and Parking NPF 13 / MLDP DP1 The site is located by the Trunk Road Network as such Transport Scotland was consulted as part of the application. The finalised consult response from Transport Scotland has concluded with no objection to the proposal subject to conditions which prior to the commencement of any works on the site would require details of the frontage landscape treatment and any EV charging infrastructure. The finalised consult response from the Transportation Manager, advises no objection subject to conditions and informative advice which would require a height restriction for any features within Page 52
Page 53
Page 5 of 7 2.4m of the edge of the carriageway; acceptable roads drainage and a turning area to be retained at all times within the site. Compliance with these requirements is likely to be achievable, however, compliance in this regard is separate from and does not override the unacceptable siting of the development on safeguarded ENV land. Surface Water Drainage NPF 22 / MLDP EP12 The application has been supported by a surface water drainage design which would entail the installation of permeable paving to act as the soakaway on car parking spaces 6-12. The surface water drainage proposals have been accepted by Moray Flood Risk Management. However, compliance with drainage requirements is separate from and does not override the unacceptable siting of the development on safeguarded ENV land. Climate Change, Soils and Biodiversity NPF 1, 2, 3 & 5 The landscape screening proposed would ensure that opportunity for biodiversity requirements would be integrated into the proposal. The land take associated with the proposal whilst unacceptable in relation to the integrity of the safeguarded ENV's purpose and function would not be of a nature and scale which would render it unacceptable in the context of the global nature and climate crisis. However, these matters are separate from and do not override the unacceptable siting of the development on safeguarded ENV land. Conclusion and Recommendation The proposal would result in the loss of an area of land identified as safeguarded green corridor as part of the ENV5 East Road designation under the MLDP 2020. The proposed change of use of ENV to car parking is not supported by the designation or local and national planning policies and as such the application is refused. OTHER MATERIAL CONSIDERATIONS TAKEN INTO ACCOUNT None HISTORY Reference No. Description Proposed office extension at 1 Pinefield Parade Elgin Moray IV30 6AG 22/00292/APP Decision Permitted Date Of Decision 06/06/22 Build extension to office/showroom 1 Pinefield Parade Elgin Moray IV30 6AG 14/00785/APP Decision Permitted Date Of Decision 17/06/14 Erect showroom extension (conservatory) at A C Yule And Son Limited 1 Pinefield Parade Pinefield Industrial Estate Elgin Moray 98/01099/FUL Decision Permitted Date Of Decision 17/09/98 Alteration and extension to premises at A C Yule And Son Limited 1 Pinefield Parade Pinefield Industrial Estate Elgin Moray 91/00865/FUL Decision Permitted Date Of Decision 08/10/91 Page 53
Page 54
Page 6 of 7 ADVERT Advert Fee paid? Yes Local Newspaper Reason for Advert Date of expiry Northern Scot No PremisesDeparture from development plan 30/11/23 PINS No PremisesDeparture from development plan 30/11/23 DEVELOPER CONTRIBUTIONS (PGU) Status N/A DOCUMENTS, ASSESSMENTS etc. * * Includes Environmental Statement, Appropriate Assessment, Design Statement, Design and Access Statement, RIA, TA, NIA, FRA etc Supporting information submitted with application? YES Summary of main issues raised in each statement/assessment/report Document Name: Drainage Statement Main Issues: Details the drainage design which entails the use of areas of permeable paving as part of the site design. Document Name: Safe Hands Report Main Issues: Observations in relation to parking at the Site (Report held as sensitive on case file). Document Name: Supporting Statement Main Issues: Seeks to provide a background to the proposals referring to the Safe Hands Report and including photos of existing parking issues. Thereafter comments which seek to support the siting and design. Document Name: Parking Statement Main Issues: Seeks to justify the parking proposals in terms of location and number of parking spaces proposed. . S.75 AGREEMENT Application subject to S.75 Agreement NO Summary of terms of agreement: Location where terms or summary of terms can be inspected: Page 54
Page 55
Page 7 of 7 DIRECTION(S) MADE BY SCOTTISH MINISTERS (under DMR2008 Regs) Section 30 Relating to EIA NO Section 31 Requiring planning authority to provide information and restrict grant of planning permission NO Section 32 Requiring planning authority to consider the imposition of planning conditions NO Summary of Direction(s) Page 55
Page 56
Page 56
Page 57
Page 57
Page 58
(Page 2 of 3) Ref: 23/01862/APP IMPORTANT YOUR ATTENTION IS DRAWN TO THE REASONS and NOTES BELOW SCHEDULE OF REASON(S) FOR REFUSAL By this Notice, Moray Council has REFUSED this proposal. The Council’s reason(s) for this decision are as follows: - The proposed change of use of designated ENV land to car parking is contrary to Elgin ENV5 East Road MLDP settlement designation, MLDP Policies: MLDP DP1 and EP5, MLDP Open Space Strategy Supplementary Guidance and National Planning Policies NPF Policies 14 and 20 because: The proposed development seeks a crude encroachment into the safeguarded ENV for car parking in a design and form which would erode the purpose and function of the ENV at this prominent access route in the town. Resulting in piecemeal fragmentation and erosion of the overall integrity of the ENV5 East Road Green Corridor as part of the wider green network in Elgin. In these terms the proposal is unacceptable and contrary to the Elgin ENV5 East Road MLDP settlement designation, MLDP Policies: MLDP DP1 and EP5, MLDP Open Space Strategy Supplementary Guidance and National Planning Policies NPF Policies 14 and 20. LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT The following plans and drawings form part of the decision:- Reference Version Title LOCATION PLAN 313889 PL01X SITE PLAN AND TESTHOLE LOCATION 313889 SU001 X TOPOGRAPHY SURVEY PINEFIELD / SP / 01 SITE PLAN NOTICE OF APPEAL TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 If the applicant is aggrieved by the decision to refuse permission for or approval required by a condition in respect of the proposed development, or to grant permission or approval subject to conditions, the applicant may require the planning authority to review the case under section 43A of the Town and Country Planning (Scotland) Act 1997 within three months from the date of this notice. The notice of review should be addressed to The Clerk, Moray Council Local Review Body, Legal and Committee Services, Council Offices, High Street, Elgin IV30 1BX. This form is also available and can be submitted online or downloaded from www.eplanning.scotland.gov.uk Page 58
Page 59
(Page 3 of 3) Ref: 23/01862/APP If permission to develop land is refused or granted subject to conditions and the owner of the land claims that the land has become incapable of reasonably beneficial use in its existing state and cannot be rendered capable of reasonably beneficial use by the carrying out of any development which has been or would be permitted, the owner of the land may serve on the planning authority a purchase notice requiring the purchase of the owner of the land’s interest in the land in accordance with Part 5 of the Town and Country Planning (Scotland) Act 1997. Page 59
Page 60
Page 60
Page 61
APPENDIX 2 NOTICE OF REVIEW, GROUNDS FOR REVIEW & SUPPORTING DOCUMENTS Page 61
Page 62
Page 62
Page 63
Page 1 of 5 The Moray Council Council Office High Street Elgin IV30 1BX Tel: 0300 1234561 Email: development.control@moray.gov.uk Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid. Thank you for completing this application form: ONLINE REFERENCE 100648431-008 The online reference is the unique reference for your online form only. The Planning Authority will allocate an Application Number when your form is validated. Please quote this reference if you need to contact the planning Authority about this application. Applicant or Agent Details Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting on behalf of the applicant in connection with this application) Applicant Agent Agent Details Please enter Agent details Company/Organisation: Ref. Number: You must enter a Building Name or Number, or both: * First Name: * Building Name: Last Name: * Building Number: Address 1 Telephone Number: * (Street): * Extension Number: Address 2: Mobile Number: Town/City: * Fax Number: Country: * Postcode: * Email Address: * Is the applicant an individual or an organisation/corporate entity? * Individual Organisation/Corporate entity S Reid Design Stewart Reid Rothes The Sma Glen +447598299753 AB38 7AG United Kingdom Aberlour info@sreiddesign.co.uk Page 63
Page 64
Page 2 of 5 Applicant Details Please enter Applicant details Title: You must enter a Building Name or Number, or both: * Other Title: Building Name: First Name: * Building Number: Address 1 Last Name: * (Street): * Company/Organisation Address 2: Telephone Number: * Town/City: * Extension Number: Country: * Mobile Number: Postcode: * Fax Number: Email Address: * Site Address Details Planning Authority: Full postal address of the site (including postcode where available): Address 1: Address 2: Address 3: Address 4: Address 5: Town/City/Settlement: Post Code: Please identify/describe the location of the site or sites Northing Easting Other Pinefield Glass Pinefield Moray Council Glass 1 Pinefield Parade Pinefield Glass IV30 6AG Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG Scotland, UK 862551 Elgin 323134 info@sreiddesign.co.uk Pinefield Glass Page 64
Page 65
Page 3 of 5 Description of Proposal Please provide a description of your proposal to which your review relates. The description should be the same as given in the application form, or as amended with the agreement of the planning authority: * (Max 500 characters) Type of Application What type of application did you submit to the planning authority? * Application for planning permission (including householder application but excluding application to work minerals). Application for planning permission in principle. Further application. Application for approval of matters specified in conditions. What does your review relate to? * Refusal Notice. Grant of permission with Conditions imposed. No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal. Statement of reasons for seeking review You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement must set out all matters you consider require to be taken into account in determining your review. If necessary this can be provided as a separate document in the ‘Supporting Documents’ section: * (Max 500 characters) Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce all of the information you want the decision-maker to take into account. You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that time or that it not being raised before that time is a consequence of exceptional circumstances. Have you raised any matters which were not before the appointed officer at the time the Yes No Determination on your application was made? * If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before your application was determined and why you consider it should be considered in your review: * (Max 500 characters) Proposed extension to existing car park Please see seperate NOR Statement. Page 65
Page 66
Page 4 of 5 Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters) Application Details Please provide the application reference no. given to you by your planning authority for your previous application. What date was the application submitted to the planning authority? * What date was the decision issued by the planning authority? * Review Procedure The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review process require that further information or representations be made to enable them to determine the review. Further information may be required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or inspecting the land which is the subject of the review case. Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other parties only, without any further procedures? For example, written submission, hearing session, site inspection. * Yes No In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion: Can the site be clearly seen from a road or public land? * Yes No Is it possible for the site to be accessed safely and without barriers to entry? * Yes No Checklist – Application for Notice of Review Please complete the following checklist to make sure you have provided all the necessary information in support of your appeal. Failure to submit all this information may result in your appeal being deemed invalid. Have you provided the name and address of the applicant?. * Yes No Have you provided the date and reference number of the application which is the subject of this Yes No review? * If you are the agent, acting on behalf of the applicant, have you provided details of your name Yes No N/A and address and indicated whether any notice or correspondence required in connection with the review should be sent to you or the applicant? * Have you provided a statement setting out your reasons for requiring a review and by what Yes No procedure (or combination of procedures) you wish the review to be conducted? * Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely on and wish the Local Review Body to consider as part of your review. Please attach a copy of all documents, material and evidence which you intend to rely on Yes No (e.g. plans and Drawings) which are now the subject of this review * Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the application reference number, approved plans and decision notice (if any) from the earlier consent. NOR Statement - A4 Document Proposed Site Plan - A2 Plan Mabbett Topo Survey - A3 plan Mabbett Paving / Drainage Layout - A3 Location Plan - A4 23/01862/APP 06/06/2024 30/10/2023 Page 66
Page 67
Page 5 of 5 Declare – Notice of Review I/We the applicant/agent certify that this is an application for review on the grounds stated. Declaration Name: Mr Stewart Reid Declaration Date: 22/08/2024 Page 67
Page 68
Page 68
Page 69
S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.ukPage 69
Page 70
S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.ukPage 70
Page 71
Page 71
Page 72
Page 72
Page 73
Page 73
Page 74
Page 74
Page 75
Page 75
Page 76
MH MH BT EV NEW CAR PARK AREA (FOR VISITORS / CUSTOMERS/ SOME MEMBERS OF STAFF) EXISTING CAR PARK (TO BE USED BY LORRIES AND VANS) PINEFIELD PARADE PROPOSED LANDSCAPING 12 11 10 9 8 7 6 12 10 9 1 2 3 4 5 PlanSite Page 76
Page 77
Page 77
Page 78
Page 78
Page 79
1:2500 (A4) SCALEDATE OCT 2023 OS LOCATIONPLAN (1:2500) S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.uk Proposed extension of car park at Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG Page 79
Page 80
MH EV 1 NEW CAR PARK AREA 12.57 12.681 2 .6 6 12.65 12. 68 1 2 . 6 71 2 . 7 3 13.20 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.79 12.89 13.05 12.89 13.78 13.73 12.51 12.83 13.14 13.25 12.87 12.66 13.03 13.68 MH Herras Fencing 13.00m12.85m 12.85m 12.90m 13.20m 13.50m 80mm Premeable BlockBlock Paving 50mm bedding min 375mm granular base Permeable geotextyle Kerbing Permeable Paving Construction Detail DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date Willow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn JF 2/10/23 PL01 X 313889 A3 GMNTS Issue Testhole Location Proposed Layout/ Pinefield Parade, Elgin Pinefield Glass Ltd Proposed Parking Extension Pinefield Glass Ltd - - - - Fall Arrows Test Hole Permeable Paving Permeable Paving Page 80
Page 81
Mabbett & Associates Ltd, Corporate and Registered Office: 13 Henderson Road, Inverness, UK, IV1 1SN Registered in Scotland No: SC 163378 info@mabbett.eu www.mabbett.eu Belfast | Cardiff | Dublin | Dundee | Edinburgh | Glasgow | Inverness | Leicester | Liverpool © 2023, Mabbett & Associates Ltd. All Rights Reserved. The name Mabbett and the Mabbett logo are Trade Marks licensed to Mabbett & Associates Ltd. Memorandum Report 10th October 2023 TO: Stuart Reid, S Reid Design FM: Gary Mackintosh CC: Pinefield Glass RE: 313889 ___________________________________________________________________________________ 1.0 Introduction Mabbett & Associates Ltd (Mabbett) was commissioned by Pinefield Glass to provide a drainage design for a proposed car park extension located at Pinefield Glass, Pinefield Parade, Elgin. The SEPA Flood Maps have been consulted prior to commencement which confirm that the proposed parking extension lies out with any areas of fluvial and pluvial flooding during a 1:200year event. 1.1 Proposal/Existing Ground Conditions Excavations were carried out on 17th January 2023 in order to assess the soils for the use of infiltration as a method of surface water management. The trial pits were excavated to a depth of 1.8m and the existing soils consisted of 400mm Topsoil, dark brown, medium fine slightly gravelly Sands to a depth of 1200mmbgl overlying brown medium to loose, fine, slightly gravelly Sands proved to the depth of the excavations. Infiltration testing was carried out in full accordance with BRE digest 365. The results can be found in Table 2 below. Table 2 Infiltration Pit Dimensions Test Zone Infiltration Test Hole No (w/l) (mgbl) Rate (m/s) INF01 0.8m x 1.2m 1.1m - 1.7m 5.921 x 10-5 In addition to the ground investigation, a topographic survey was carried out within the site to establish existing and proposed levels. Based on the site topography and the test results obtained, it is proposed to install permeable paving to the northwest and west of the proposed parking area as indicated within the enclosed drawing within which the proposed levels and construction for the permeable paving are shown. Page 81
Page 82
Pinefield Glass, Pinefield Parade, Elgin 313889 © 2023, Mabbett & Associates Ltd Page 2 of 2 The calculation sheet enclosed confirms that the permeable paving will require a minimum construction depth of 375mm to manage the surface water flows during a 1:30year event with 42% allowance for climate change. This memorandum report has been prepared by the following Mabbett personnel: MABBETT & ASSOCIATES LTD ___________________________________ Gary Mackintosh BSc Principal Engineer This report has been reviewed and approved by the following Mabbett personnel: MABBETT & ASSOCIATES LTD _______ James Forbes, CEng, CEnv, CWEM, MCIWEM Director, Engineering Page 82
Page 83
MH EV 1 NEW CAR PARK AREA 12.57 12.681 2 .6 6 12.65 12. 68 1 2 . 6 71 2 . 7 3 13.20 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.79 12.89 13.05 12.89 13.78 13.73 12.51 12.83 13.14 13.25 12.87 12.66 13.03 13.68 MH Herras Fencing 13.00m12.85m 12.85m 12.90m 13.20m 13.50m 80mm Premeable BlockBlock Paving 50mm bedding min 375mm granular base Permeable geotextyle Kerbing Permeable Paving Construction Detail DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date Willow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn JF 2/10/23 PL01 X 313889 A3 GMNTS Issue Testhole Location Proposed Layout/ Pinefield Parade, Elgin Pinefield Glass Ltd Proposed Parking Extension Pinefield Glass Ltd - - - - Fall Arrows Test Hole Permeable Paving Permeable Paving Page 83
Page 84
MasterDrain Company Project Item Job Ref Sheet no. Calc. by Date Checked by Date Approved by Date Mabbett & Associates Pinefield Glass, Elgin Permeable Paving Calculations 3113889 1 GM 02/10/23 Data:- FSR Hydrology:- Location = ELGIN Grid reference = NJ2162 M5-60 (mm) = 14 r = 0.24 Soil index = 0.40 SAAR (mm/yr) = 800 Return period = 200 WRAP = 3 i) Relatively impermeable soils in boulder and sedimentary clays, and in alluvium, especially in eastern England; ii) Permeable soils with shallow ground water in low-lying areas; iii) Mixed areas of permeable and impermeable soils, in approximately equal proportions. Design data:- Total drained area = 400 m² Perm. pavior area = 90 m² Storm duration = 6.00 hrs Climate change factor = 1.42 Inf. coefficient = 0.1850 m/hr % Voids = 30.0% Saturation depth = 80.0 % Runoff factor = 95% Calculated data:- Mean rain intensity = 14.3 mm/hr @ 200yrs/6hrs with 1.42 climate change factor Total rainfall volume = 34.358 m³. Total runoff volume = 32.640 m³. Mean discharge rate = 4.625 l/s. Infiltration volume = 99.900 m³. Infiltration volume exceeds the total runoff volume. Minimal storage is required, therefore a minimum construction thickness of 375mm should be used. Storm profile used = Summer Page 84
Page 85
Mabbett & Associates Ltd, Corporate and Registered Office: 13 Henderson Road, Inverness, UK, IV1 1SN Registered in Scotland No: SC 163378 info@mabbett.eu www.mabbett.eu Belfast | Cardiff | Dublin | Dundee | Edinburgh | Glasgow | Inverness | Leicester | Liverpool © 2024, Mabbett & Associates Ltd. All Rights Reserved. The name Mabbett and the Mabbett logo are Trade Marks licensed to Mabbett & Associates Ltd. Memorandum Report 25 March 2024 TO: S Reid Design, The Sma Ranch, Rothes FM: Gary Mackintosh CC: Pinefield Glass, Pinefield Parade, Elgin RE: Parking Statement ___________________________________________________________________________________ 1.0 Introduction Mabbett & Associates Ltd (Mabbett) was commissioned by Pinefield Glass to provide a Topographic Survey and Drainage Assessment for a proposed new parking area at Pinefield Glass, Pinefield Parade, Elgin. In addition Mabbett have been asked to respond to a query raised through planning as to the justification for the number and position of parking spaces proposed. 1.1 Previous Consultaiton/Design Statement During the planning application, supporting statements have been provided in the form of a Design Statement which makes reference to a site inspection report carried out by Safe Hands. The inspection highlighted that there is currently little to no segregation between the loading/unloading and storage areas and the general public/staff. The solution to the issue is to install a new car parking area to the north of the existing customer parking area being to only area available to extend the existing parking. In addition, it is proposed to provide road markings to delineate the loading and delivery area and the parking with specific road markings which have been demonstrated within the enclosed drawings. It is anticipated that this will reduce the risk of potential collision without the intrusive locating of physical barriers which may restrict movement. 1.2 Parking Volume With reference to the Design Standards within The Moray Local Development Plan 2020 Vol 1 – Policies Appendix 2 Parking Standards for Use Classes, a Class 6 storage or distribution Warehousing/distribution unit requires a maximum of 2.5No spaces per 100m2 GFA and a minimum of 2.0 No spaces per 100m2 GFA. Page 85
Page 86
As this is an existing business/facility and the new parking represents an increase to the existing parking, the minimum of 2.0 No spaces per 100m2 GFA is considered reasonable. This equates to a minimum requirement of 27 No Spaces which have been marked within the enclosed drawings. As noted, the existing parking area to the west does not function due to loading and unloading movements and lorry parking. Mabbett can therefore confirm that the addition of the new parking area allows the appropriate level of parking to be provided whilst increasing safety standards for staff and general public. This memorandum report has been prepared by the following Mabbett personnel: MABBETT & ASSOCIATES LTD Gary Mackintosh BSc Principal Engineer This report has been reviewed and approved by the following Mabbett personnel: MABBETT & ASSOCIATES LTD James Forbes, CEng, CEnv, CWEM, MCIWEM Director, Engineering Pinefield Glass, Elgin – Parking Statement 313889 © 2024, Mabbett & Associates Ltd Page 2 of 2 Page 86
Page 87
PINEFIELD GLASS BT MH MH EV ENTRANCE PINEFIELD PARADE TO ABERDEEN PERIMETER ROAD FORMER CAR DISPLAY AREA 1 GRASS VERGE NEW CAR PARK AREA 12.36 12.57 12.6812.66 12.65 12.68 12.6712.7312.7712.7912.82 12.82 12.86 12.98 13.00 13.20 13.41 13.58 13.68 13.75 13.80 13.93 14.89 15.19 14.78 14.38 14.09 13.91 13.89 13.84 13.78 13.74 13.54 13.49 13.40 13.29 13.36 13.05 12.89 12.89 12.86 12.76 12.75 12.73 12.63 12.60 12.55 12.5912.60 12.39 12.30 15.16 14.82 14.62 14.53 14.41 14.19 14.12 13.94 13.84 13.68 13.91 14.35 14.87 15.38 15.84 16.06 16.22 14.45 14.36 13.86 16.05 15.97 16.01 16.07 16.26 16.40 16.36 16.07 16.1015.90 15.3615.3915.3415.31 14.72 14.62 14.73 14.76 14.92 14.6114.53 13.25 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.63 13.82 13.79 13.01 13.01 12.89 13.05 12.89 16.4016.34 16.38 16.16 15.65 15.22 14.84 14.54 13.78 13.73 12.51 12.83 13.14 13.25 14.07 14.56 15.07 15.10 15.65 15.70 15.46 13.64 14.34 12.87 12.66 13.03 13.92 13.73 13.78 13.72 13.96 13.81 13.68 13.68 13.60 13.48 13.63 13.64 13.71 15.0 15.0 12.5 MH MHBT Herras Fencing 13.00m12.85m 12.85m 12.90m 13.20m 13.50m CUSTOMERPARKING LOADING/DELONLY 1234 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date Willow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn DC 12/03/24 SU001 X 313889 A3 GM1:200 Issue Layout Proposed Road Marking Pinefield Parade, Elgin Pinefield Glass Ltd Proposed Parking Extension Pinefield Glass Ltd - - - - Page 87
Page 88
862500N 862500N 862600N 862600N 323050E323050E 323200E323200E 12.36 12.57 12.6812.66 12.65 12.68 12.6712.7312.7712.7912.82 12.82 12.86 12.98 13.00 13.20 13.41 13.58 13.68 13.75 13.80 13.93 14.89 15.19 15.19 14.78 14.38 14.09 13.91 13.89 13.84 13.78 13.74 13.54 13.49 13.40 13.29 13.36 13.05 12.89 12.89 12.86 12.76 12.75 12.73 12.63 12.60 12.55 12.5912.60 12.39 12.30 15.16 14.82 14.62 14.53 14.41 14.19 14.12 13.94 13.84 13.68 13.91 14.35 14.87 15.38 15.84 16.06 16.22 14.45 14.36 13.86 16.05 15.97 16.01 16.07 16.26 16.40 16.36 16.07 16.1015.90 15.3615.3915.3415.31 14.72 14.62 14.73 14.76 14.92 14.6114.53 13.25 13.22 12.94 12.9312.81 12.64 12.61 12.63 12.65 12.80 13.63 13.82 13.79 13.01 13.01 12.89 13.05 12.89 16.4016.34 16.38 16.16 15.65 15.22 14.84 14.54 13.78 13.73 12.51 12.83 13.14 13.25 14.07 14.56 15.07 15.10 15.65 15.70 15.46 13.64 14.34 12.87 12.66 13.03 13.92 13.73 13.78 13.72 13.96 13.81 13.68 13.68 13.60 13.48 13.63 13.64 13.71 15.0 15.0 12.5 MH MHBT Herras Fencing DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date W illow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn GM 7/09/23 SU001 X 313889 A3 SP1:500 Issue Topographic Survey Elgin Pinefield Glass Proposed Car Park Extension Pinefield Glass - - - - north 50 0 20 10 30 40 Scale 1:500 (metres) Page 88
Page 89
S.REID MCIAT CHARTERED ARCHITECTURAL TECHNOLOGIST THE SMA GLEN, ROTHES, ABERLOUR, AB38 7AG M M E W - (07598) 299753 - (07926) 151101 - info@sreiddesign.co.uk - www.sreiddesign.co.uk SEP 2023 DATE SCALE AS STATED (A2) DRG. NO. PINEFIELD / SP / 01 Proposed extension to existing car park at Pinefield Glass, 1 Pinefield Parade, Elgin, Moray IV30 6AG P i n e f i e l d G l a s s, E l g i n P i n e f i e l d G l a s s, E l g i n EV CHARGING STATION WITH 2 TETHERED CONNECTORS CAPABLE OF DELIVERING A MINIMUM POWER OUTPUT OF 150kw. EV RED OUTLINE DENOTES EXTENT OF OW NERSHIP / APPLICATION BOUNDARY. M H M H BT PINEFIELD GLASS EV Plan (scale 1:500) Site E A S T R O A D HIGHLAND INDUSTRIAL SUPPLIES PINEFIELD PARADE PREMIER INN VARIOUS UNITS PENTLAND (LAND ROVER) TO ABERDEEN HIGHLAND GALVANIZERS PERIMETER ROAD FORMER CAR DISPLAY AREA GRASS VERGE NEW CAR PARK AREA 1211109 8 7 6 12109 EXISTING CAR PARK ENTRANCE 123 45 12.36 12.68 12.73 12.82 12.98 13.20 13.4113.29 13.36 13.05 12.89 12.86 12.76 12.73 12.60 12.60 12.39 12.30 13.25 13.22 12.64 12.63 12.80 13.63 13.82 13.79 13.01 13.01 12.89 13.05 12.89 12.51 13.14 13.25 14.07 13.64 12.87 12.66 13.03 13.73 13.68 13.68 13.48 13.63 13.64 13.71 MH MH BT EV E A S T R O A D 1 GRASS VERGE NEW CAR PARK AREA 2 3 4 5 1211109 8 7 6 FOOTPATH ENTRANCE PINEFIELD PARADE PERMEABLE PAVING TO ACT AS SOAKAWAY PERMEABLE PAVING TO ACT AS SOAKAWAY NEW EXTENSION 6800 1600 Surface water run-off to fall to north west corner of site and to permeate through permeable paving. All drainage works to be carried in accordance with Mabbe4 report / design - ref 313889 D R A I N A G E Carpark Plan8ng / Biodiversity enhancement - New trees are to be planted out which will consist of a mixture of Birch, Larch, Rowan, Hazel, Willow and cherry trees at spacings denoted. All new trees to be at least half standard (approx 1.5m in height). All plan8ng, seeding or turfing shall be carried out in the first plan8ng and seeding seasons following the comple8on of development. Any trees or plants which within a period of five years from the comple8on of the development die, for whatever reason are removed or damaged shall be replaced in the next plan8ng season with others of the same size and species. L A N D S C A P E W O R K S Birch (150cm min). Larch (150cm min). Rowan (150cm min). Hazel (150cm min). W illow (150cm min). Cherry (150cm min). C A R P A R K B I O D I V E R S I T Y L E G E N D - Plan (scale 1:250) Site Holly Hedge (150cm min). Laurel Hedge (150cm min). C A R P A R K B I O D I V E R S I T Y L E G E N D - Page 89
Page 90
Private & confidential 1/3 Report 2023 Dawn McKenzie / 18 Aug 2023 / Pinefield Glass Conducted on 18.08.2023 08:09 BST Prepared by Dawn McKenzie Client Pinefield Glass Location Pinefield Industial Estate Manager/Supervisor Martin Charlesworth - Director Page 90
Page 91
Private & confidential 2/3 Workplace Transport Safety - Further to our discussion during my last visit Martin I have attached some useful information to help Pinefield make the appropriate safety improvements required to ensure the safety of employees, drivers, visitors and other road users are not compromised by the work being carried out at your premises. HSE document HSG 136 is an excellent resource which I recommend to all clients who have the responsibility of transport/pedestrian safety. As I have noted in previous inspections the customer car parking area and the goods unloading/loading areas are not appropriately segregated. This becomes more apparent on days where deliveries arrive and the whole of the front carpark becomes blocked. HSE states "Every workplace must be safe for the people and vehicles using it. A well designed workplace that ensures vehicles and pedestrians are segregated will make transport accidents less likely”. When planning workplace traffic routes, take account of the following requirements from the Regulations: - They must be suitable for the people and vehicles using them and organised so that they can both move around safely. - Where vehicles and pedestrians share a traffic route, there must be enough separation between them (segregation). - Pedestrians or vehicles must be able to use a traffic route without causing danger to the health or safety of people working near it. - Vehicle routes must be far enough away from doors or gates that pedestrians use, or from pedestrian routes that lead on to them, so the safety of pedestrians is not threatened. - Every traffic route must have a well-drained surface that is suitable for its purpose and must not be so uneven, potholed, sloped or slippery that it might expose anyone to a risk to their health or safety. - They must, so far as is reasonably practicable, be kept free from obstructions and anything that may cause anyone to slip, trip or fall. - They must have appropriate markings and signs where necessary for health or safety reasons. I know you are keen to develop land around the property which would give you the additional space to put these measures in place. I would also recommend looking at the possibility of a one-way systems. HSE states: “One way systems are designed to limit reversing and prevent conflicting movements caused by ‘two-way’ traffic flow. They should work clockwise around a site, as this is the direction most drivers will expect, unless there are reasons why this would not be a safer option. They need to be clearly marked out using road Page 91
Page 92
Private & confidential 3/3 markings and signs so that drivers can follow them easily. The advantages of oneway systems are: - They help pedestrians know which direction vehicles are likely to be coming from; - They can be arranged to allow for good visibility around corners and at crossing points; - They are easy to enforce; - They are particularly useful where site access roads are narrow and visibility is poor”. We have seen incidents where pedestrians have been hurt and in some cases killed where pedestrian segregation is not in place. Safehands strongly recommends the first step should be to establish a safe route in and out of the building using suitable barriers where reasonably practicable. (There are good examples of this on page 11 HSG 136) Safehands are happy to discuss any of these points in more detail. Page 92
Page 93
MORAY LOCAL REVIEW BODY 14 NOVEMBER 2024 SUMMARY OF INFORMATION FOR CASE No LR305 Planning Application 24/00428/PPP – Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston Ward 5 – Heldon and Laich Planning permission in principle was refused under the Statutory Scheme of Delegation by the Appointed Officer on 9 July 2024 on the grounds that: The proposal is contrary to the provisions of Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan because: The proposal to create an additional house site in the garden grounds of the existing parent property Stanes would appear incongruous to the existing site layout and fail to reflect and respect the existing character of the site. The proposal would therefore have a detrimental impact on the quality of the built environment at this site and be detrimental to the character and surrounding area which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics for all development. The proposal would therefore be contrary to Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan. Documents considered or prepared by the Appointed Officer in respect of the above planning application are attached as Appendix 1. The Notice of the Review, Grounds for Review and any supporting documents submitted by the Applicant are attached as Appendix 2. No Further Representations were received in response to the Notice of Review. Item 5 Page 93
Page 94
Page 94
Page 95
Cummingston Hithe Collach Shingle Cabrach How Boulders and Rock Berryhill El Sub Sta LightCroila Coastal Slopes Crofts Path (um) Rock Mean High Water Springs (disused) Cabrach Well Sand Dallas Laich Cottage Coastal Tigh na Marg A' chonasg Kevelaer Ferndale Cottage Groyne Ardgour 33.0m 31.7m 32.8m 35.1m 42.1m 34.2m Slopes Stanes Cladach House Ancora Edoras B 9040 Greenbrae Parkend Cabrach Carnan Braemore MorvenRowandale Gull's Rowan Bank Bank Bay The Farm FB Wembley Sea Hope ESS Drummond SEAVIEW RD SEAVIEW Veronica Avron 11 ROAD 1 10 14 2 6 FB Sand Path (um) Coastal Slopes Cottage Shingle Cottage Planning Application Reference Number: 24/00428/PPP LOCATION PLAN This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationary Office Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. (c) Crown Copyright. The Moray Council 100023422 2024 I 1:2,500 Page 95
Page 96
Page 96
Page 97
APPENDIX 1 DOCUMENTS CONSIDERED OR PREPARED BY THE APPOINTED OFFICER Page 97
Page 98
Page 98
Page 99
Page 1 of 7 The Moray Council Council Office High Street Elgin IV30 1BX Tel: 0300 1234561 Email: development.control@moray.gov.uk Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid. Thank you for completing this application form: ONLINE REFERENCE 100664541-001 The online reference is the unique reference for your online form only. The Planning Authority will allocate an Application Number when your form is validated. Please quote this reference if you need to contact the planning Authority about this application. Type of Application What is this application for? Please select one of the following: * Application for planning permission (including changes of use and surface mineral working). Application for planning permission in principle. Further application, (including renewal of planning permission, modification, variation or removal of a planning condition etc) Application for Approval of Matters specified in conditions. Description of Proposal Please describe the proposal including any change of use: * (Max 500 characters) Is this a temporary permission? * Yes No If a change of use is to be included in the proposal has it already taken place? Yes No (Answer ‘No’ if there is no change of use.) * Has the work already been started and/or completed? * No Yes – Started Yes - Completed Applicant or Agent Details Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting on behalf of the applicant in connection with this application) Applicant Agent Form new vehicle access to dwelling and sub divide ground for dwelling house Page 99
Page 100
Page 2 of 7 Agent Details Please enter Agent details Company/Organisation: Ref. Number: You must enter a Building Name or Number, or both: * First Name: * Building Name: Last Name: * Building Number: Address 1 Telephone Number: * (Street): * Extension Number: Address 2: Mobile Number: Town/City: * Fax Number: Country: * Postcode: * Email Address: * Is the applicant an individual or an organisation/corporate entity? * Individual Organisation/Corporate entity Applicant Details Please enter Applicant details Title: You must enter a Building Name or Number, or both: * Other Title: Building Name: First Name: * Building Number: Address 1 Last Name: * (Street): * Company/Organisation Address 2: Telephone Number: * Town/City: * Extension Number: Country: * Mobile Number: Postcode: * Fax Number: Email Address: * Tulloch of Cummingston Ltd Mrs Christopher I Bremner Noble Tulloch House Cummingston Tulloch House Stanes 01343 835600 IV30 5ST IV30 5XY United Kingdom Scotland Elgin Cummingston Forsyth street christopher@tullochofcummingston.co.uk john@tullochofcummingston.co.uk Page 100
Page 101
Page 3 of 7 Site Address Details Planning Authority: Full postal address of the site (including postcode where available): Address 1: Address 2: Address 3: Address 4: Address 5: Town/City/Settlement: Post Code: Please identify/describe the location of the site or sites Northing Easting Pre-Application Discussion Have you discussed your proposal with the planning authority? * Yes No Site Area Please state the site area: Please state the measurement type used: Hectares (ha) Square Metres (sq.m) Existing Use Please describe the current or most recent use: * (Max 500 characters) Access and Parking Are you proposing a new altered vehicle access to or from a public road? * Yes No If Yes please describe and show on your drawings the position of any existing. Altered or new access points, highlighting the changes you propose to make. You should also show existing footpaths and note if there will be any impact on these. STANES 421.00 Dwelling with detached double garage Moray Council CUMMINGSTON ELGIN IV30 5XY 869030 313483 Page 101
Page 102
Page 4 of 7 Are you proposing any change to public paths, public rights of way or affecting any public right of access? * Yes No If Yes please show on your drawings the position of any affected areas highlighting the changes you propose to make, including arrangements for continuing or alternative public access. Water Supply and Drainage Arrangements Will your proposal require new or altered water supply or drainage arrangements? * Yes No Are you proposing to connect to the public drainage network (eg. to an existing sewer)? * Yes – connecting to public drainage network No – proposing to make private drainage arrangements Not Applicable – only arrangements for water supply required Do your proposals make provision for sustainable drainage of surface water?? * Yes No (e.g. SUDS arrangements) * Note:- Please include details of SUDS arrangements on your plans Selecting ‘No’ to the above question means that you could be in breach of Environmental legislation. Are you proposing to connect to the public water supply network? * Yes No, using a private water supply No connection required If No, using a private water supply, please show on plans the supply and all works needed to provide it (on or off site). Assessment of Flood Risk Is the site within an area of known risk of flooding? * Yes No Don’t Know If the site is within an area of known risk of flooding you may need to submit a Flood Risk Assessment before your application can be determined. You may wish to contact your Planning Authority or SEPA for advice on what information may be required. Do you think your proposal may increase the flood risk elsewhere? * Yes No Don’t Know Trees Are there any trees on or adjacent to the application site? * Yes No If Yes, please mark on your drawings any trees, known protected trees and their canopy spread close to the proposal site and indicate if any are to be cut back or felled. All Types of Non Housing Development – Proposed New Floorspace Does your proposal alter or create non-residential floorspace? * Yes No Page 102
Page 103
Page 5 of 7 Schedule 3 Development Does the proposal involve a form of development listed in Schedule 3 of the Town and Country Yes No Don’t Know Planning (Development Management Procedure (Scotland) Regulations 2013 * If yes, your proposal will additionally have to be advertised in a newspaper circulating in the area of the development. Your planning authority will do this on your behalf but will charge you a fee. Please check the planning authority’s website for advice on the additional fee and add this to your planning fee. If you are unsure whether your proposal involves a form of development listed in Schedule 3, please check the Help Text and Guidance notes before contacting your planning authority. Planning Service Employee/Elected Member Interest Is the applicant, or the applicant’s spouse/partner, either a member of staff within the planning service or an Yes No elected member of the planning authority? * Certificates and Notices CERTIFICATE AND NOTICE UNDER REGULATION 15 – TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE) (SCOTLAND) REGULATION 2013 One Certificate must be completed and submitted along with the application form. This is most usually Certificate A, Form 1, Certificate B, Certificate C or Certificate E. Are you/the applicant the sole owner of ALL the land? * Yes No Is any of the land part of an agricultural holding? * Yes No Certificate Required The following Land Ownership Certificate is required to complete this section of the proposal: Certificate A Land Ownership Certificate Certificate and Notice under Regulation 15 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Certificate A I hereby certify that – (1) - No person other than myself/the applicant was an owner (Any person who, in respect of any part of the land, is the owner or is the lessee under a lease thereof of which not less than 7 years remain unexpired.) of any part of the land to which the application relates at the beginning of the period of 21 days ending with the date of the accompanying application. (2) - None of the land to which the application relates constitutes or forms part of an agricultural holding Signed: Christopher Bremner On behalf of: Mrs I Noble Date: 13/03/2024 Please tick here to certify this Certificate. * Page 103
Page 104
Page 6 of 7 Checklist – Application for Planning Permission Town and Country Planning (Scotland) Act 1997 The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Please take a few moments to complete the following checklist in order to ensure that you have provided all the necessary information in support of your application. Failure to submit sufficient information with your application may result in your application being deemed invalid. The planning authority will not start processing your application until it is valid. a) If this is a further application where there is a variation of conditions attached to a previous consent, have you provided a statement to that effect? * Yes No Not applicable to this application b) If this is an application for planning permission or planning permission in principal where there is a crown interest in the land, have you provided a statement to that effect? * Yes No Not applicable to this application c) If this is an application for planning permission, planning permission in principle or a further application and the application is for development belonging to the categories of national or major development (other than one under Section 42 of the planning Act), have you provided a Pre-Application Consultation Report? * Yes No Not applicable to this application Town and Country Planning (Scotland) Act 1997 The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 d) If this is an application for planning permission and the application relates to development belonging to the categories of national or major developments and you do not benefit from exemption under Regulation 13 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013, have you provided a Design and Access Statement? * Yes No Not applicable to this application e) If this is an application for planning permission and relates to development belonging to the category of local developments (subject to regulation 13. (2) and (3) of the Development Management Procedure (Scotland) Regulations 2013) have you provided a Design Statement? * Yes No Not applicable to this application f) If your application relates to installation of an antenna to be employed in an electronic communication network, have you provided an ICNIRP Declaration? * Yes No Not applicable to this application g) If this is an application for planning permission, planning permission in principle, an application for approval of matters specified in conditions or an application for mineral development, have you provided any other plans or drawings as necessary: Site Layout Plan or Block plan. Elevations. Floor plans. Cross sections. Roof plan. Master Plan/Framework Plan. Landscape plan. Photographs and/or photomontages. Other. If Other, please specify: * (Max 500 characters) Page 104
Page 105
Page 7 of 7 Provide copies of the following documents if applicable: A copy of an Environmental Statement. * Yes N/A A Design Statement or Design and Access Statement. * Yes N/A A Flood Risk Assessment. * Yes N/A A Drainage Impact Assessment (including proposals for Sustainable Drainage Systems). * Yes N/A Drainage/SUDS layout. * Yes N/A A Transport Assessment or Travel Plan Yes N/A Contaminated Land Assessment. * Yes N/A Habitat Survey. * Yes N/A A Processing Agreement. * Yes N/A Other Statements (please specify). (Max 500 characters) Declare – For Application to Planning Authority I, the applicant/agent certify that this is an application to the planning authority as described in this form. The accompanying Plans/drawings and additional information are provided as a part of this application. Declaration Name: Mr Blair Tulloch Declaration Date: 13/03/2024 Payment Details Online payment: 097889 Payment date: 13/03/2024 12:30:36 Created: 13/03/2024 12:30 Page 105
Page 106
Page 106
Page 107
t - (01343) 835600 f - (01343) 835700 e - info@tullochofcummingston.co.uk web - www.tullochofcummingston.co.uk Form plot adjacent to Stanes Cummingston Stanes / Site 01 A Boundary amended 24.05.24 M AR 2024 DATE DRAWN BY CBDRAWING no. SCALE DRAW ING DESCRIPTION 1:200 (A3) PROJECT Site Plan Proposed house outline Owned by Applicant B9040SEA E Stanes Braemore h Coage 34.2m 900 900 5000 5000 5000 5000 2000 12795 2no. parking spaces for a 3 bedroom house. W hole driveway constructed in paviors Existing garage to be demolished 2no. parking spaces for Existing house. W hole driveway constructed in paviors Drop kerbs at new access to Existing house Exisitng wall and Hedge Access Lane owned by Applicant Exisitng stone wall Grass verge Grass verge Pavement Existing Drop kerbs at access to proposed site FFL - 33.800 FFL - 33.800 Site area - 442sqm Site area - 869sqm 0 4m 4m 8m 12m 16m 20m 1:200 Page 107
Page 108
Page 108
Page 109
t - (01343) 835600 f - (01343) 835700 e - info@ tullochofcummingston.co.uk web - www.tullochofcummingston.co.uk Form plot adjacent to Stanes Cummingston Stanes / Loc 01 M AR 2024 DATE DRAWN BY CBDRAWING no. SCALE DRAWING DESCRIPTION 1:1250 (A4) PROJECT Location Plan 0 50m 25m 25m 75m 100m 125m 1:1250 ROAD B 9040 SEAVIEW Greenbrae Cladach House Ancora Veronica 31.7m BM 33.77m Stanes Braemore Laich Co'age Cabrach Co'age Hope 32.8m Light Sea Bay Rowandale Ardgour Bank Drummond 34.2m Avron Dallas Rowan Bank Ferndale Co'age Gull's Morven Co'age Co'age View Kevelaer Croila Cro3s Berryhill Bank El Sub Sta 33.0m View Edoras The Collach Parkend Gull's Co'age Wembley Page 109
Page 110
Page 110
Page 111
t - (01343) 835600 f - (01343) 835700 e - info@tullochofcummingston.co.uk web - www.tullochofcummingston.co.uk Form plot adjacent to Stanes Cummingston Stanes / Vis 01 M AR 2024 DATE DRAWN BY CBDRAWING no. SCALE DRAW ING DESCRIPTION 1:500 (A1) PROJECT Visibility Plan Proposed house outline Owned by Applicant B9040SEAVIEW ROAD 11 10 12 Cladach House Ancora BM 33.77m Stanes Braemore Laich Coage Rowandale 34.2m Morven PLOT 14 2000 34390 mm 70000 mm 2000 A A 5000 5000 5000 5000 2no. parking spaces for a 3 bedroom house. Whole driveway constructed in paviors Existing garage to be demolished 2no. parking spaces for Existing house. Whole driveway constructed in paviors Drop kerbs at new access to Existing house Exisitng wall and Hedge Access Lane owned by Applicant Exisitng stone wall Grass verge Grass verge Pavement Existing Drop kerbs at access to proposed site FFL - 33.800 FFL - 33.800 Site area - 421sqm Site area - 852sqm 30.270 Sec,on A-A 30.00 31.00 32.00 37.00 33.00 38.00 34.00 39.00 35.00 40.00 36.00 41.00 FFL 33.800 Page 111
Page 112
Page 112
Page 113
Mabbett & Associates Ltd, Corporate and Registered Office: 13 Henderson Road, Inverness, UK, IV1 1SN Registered in Scotland No: SC 163378 info@mabbett.eu www.mabbett.eu Belfast | Cardiff | Dublin | Dundee | Edinburgh | Glasgow | Inverness | Leicester | Liverpool © 2024, Mabbett & Associates Ltd. All Rights Reserved. The name Mabbett and the Mabbett logo are Trade Marks licensed to Mabbett & Associates Ltd. 29 April 2024 Project No: 315097 Drainage Assessment: Proposed Dwelling within land adjacent to Stanes, Main Street, Cummingston IV30 5XY Prepared for: C/O Christopher Bremner Tulloch of Cummingston Tulloch House Forsyth Street Hopeman IV30 8ST Contents Amendment Record This report has been issued and amended as follows: Revision Description Date Signed 1.0 First Issue 29 April 2024 G Mackintosh Page 113
Page 114
Page 114
Page 115
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page ii Table of Contents Section 1.0 Introduction 1 1.1 Introduction to Surface Water Treatment 1 Section 2.0 Site Profile and Ground Assessment 3 2.1 Existing Site 3 2.2 Existing Ground Conditions 3 2.3 Location of Services 3 2.4 Other Implications of Plot Size or Vegetation 3 2.5 Infiltration Testing 4 Section 3.0 Surface Water 5 3.1 Minimum System Requirements 5 3.2 Recommendation - Surface Water 5 Section 4.0 Disclaimer 5 Section 5.0 References 7 Appendix 1: Test Hole/Discharge Location 10 Appendix 2: Storage Calculations 11 Appendix 3: Rain Garden Construction Details 10 Page 115
Page 116
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 1 of 8 Section 1.0 Introduction Mabbett & Associates Ltd (Mabbett) was commissioned by Tulloch of Cummingston to undertake an assessment of the surface water treatment and management options for proposed new dwelling to be formed in land adjacent to exiting property, Stanes, Main Street, Cummingston. 1.1 Introduction to Surface Water Treatment With regard to surface water treatment and dispersal, Regulation 3.6 of the Building (Scotland) Regulations 2004, as reproduced below, states that: Every building and hard surface within the curtilage of a building, must be designed and constructed with a surface water drainage system that will: (a) ensure the disposal of surface water without threatening the building and the health and safety of the people in and around the building; and (b) have facilities for the separation and removal of silt, grit and pollutants. Section 3.6.3 of the Technical Handbook provides methods of discharging surface water that, if employed, would meet the requirements of the authorities. With regard to SEPA’s requirements, General Binding Rule (GBR) 10, in pursuance of the Water Environment (Controlled Activities) (Scotland) Regulations 2011, states that the provision of a sustainable urban drainage system (SUDS) is required unless the discharge arises from a single house or if the discharge is to be made to coastal waters. GBR10 and the relevant associated rule is outlined overleaf. Page 116
Page 117
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 2 of 8 GBR10: a) Discharge of surface water run-off from a surface water drainage system to the water environment from: i. Up to 60 hectares of land used for residential premises; ii. Land used for non-residential premises or yards, except where the buildings or yards are in an industrial estate; iii. Land used as a motorised vehicle parking area with up to 1,000 parking spaces; iv. Metalled roads other than motorways and A roads; v. Waterbound roads; or b) Discharge of water run-off from a construction site to the water environment where the site, including any constructed access tracks does not: i. Exceed 4 hectares; ii. Contain a road or track length in excess of 5 km; or iii. Including any area of more than 1 hectare or any length of more than 500 metres on ground with a slope in excess of 25º. Rules: d) the discharge must not contain any water run-off from any built developments, the construction of which is completed on or after 01 April 2007, or from construction sites operated on or after 01 April 2007, unless: i. during construction those developments are drained by a SUD system or equivalent systems equipped to avoid pollution of the water environment; ii. following construction those developments are drained by a SUD system equipped to avoid pollution of the water environment; iii. the run-off is from a development that is a single dwelling and its curtilage; or iv. the discharge is to coastal water. (Source; SEPA: The Water Environment (Controlled Activities) (Scotland) Regulations 2011 - A Practical Guide) Version 9.2, December 2022. Page 117
Page 118
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 3 of 8 Section 2.0 Site Profile and Ground Assessment 2.1 Existing Site Stanes is located to the north of Main Street, Cummingston at or about NGR NJ 13496 69033 The SEPA Flood Map identifies the site and surrounding area as having no specific risk from fluvial or pluvial flooding during a 1:200year event. 2.2 Existing Ground Conditions Trial pits were carried out by Mabbett on 10th April 2024 to assess the suitability of the existing soils for the use of infiltration as a method of surface water management. The trial pits were excavated to a depth of 1.5m which confirmed ground conditions of brown, firm to stiff, slightly sandy, silty, Clays proved to the depth of the excavations. There was no evidence of contamination of water table present during the excavations. 2.3 Location of Services There are no known services located within the site boundary. 2.4 Other Implications of Plot Size or Vegetation Any infiltration device for sewage or wastewater must be located: at least 50m from any spring, well or borehole used as a drinking water supply, and at least 10m horizontally from any watercourse (including any inland or coastal waters), permeable drain, road or railway. Any infiltration system and any treatment plant must also be located: at least 5m from a building, and at least 5m from a boundary. The location of any septic tank or treatment plant must ensure that a desludging tanker can gain access to a working area that: will provide a clear route for a suction hose from the tanker to the tank, is not more than 25 m from the tank where it is not more than 4m higher than the invert level of the tank, and is sufficient to support a vehicle axle load of 14 tonnes. There should be no notable vegetation that might interfere with any system proposed or vice versa. Page 118
Page 119
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 4 of 8 2.5 Infiltration Testing Infiltration testing carried out to BRE 365 Digest for the purpose of evaluating the length and position of a traditional soakaway was undertaken by Mabbett during the site visit. Weather conditions during the visit were dry/overcast. The conditions were not considered abnormal for the time of year. The testing proved unsuccessful as a result of the clay-based soils, it was concluded the site was not conducive to the installation of any form of disposal system based on infiltration. As a result of these findings, an alternative solution based on achieving a discharge of appropriately attenuated and treated surface water to a watercourse is required to be investigated. Page 119
Page 120
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 5 of 8 Section 3.0 Surface Water 3.1 Minimum System Requirements In pursuit of compliance with Regulation 3.6 of the Building (Scotland) Regulations 2004, Section 3.6.3 of the Technical Handbook provides methods of discharging surface water that, if employed, would meet the requirements: (a) a SUD system designed and constructed in accordance with clause 3.6.4; (b) a soakaway constructed in accordance with: clause 3.6.5; the guidance in BRE Digest 365, ‘Soakaway Design’, or National Annex NG 2 of BS EN 752-4: 1998; (c) A public sewer provided under the Sewerage (Scotland) Act 1968; (d) An outfall to a watercourse, such as a river, stream or loch or coastal waters, that complies with any notice and/or consent by SEPA, or (e) If the surface water is from a dwelling, to a storage container with an overflow discharging to either of the 4 options above. The area to be drained consists of the roof of the dwelling and associated hardstandings. 3.2 Recommendation - Surface Water It is proposed that the surface water makes discharges to the existing sewer located within the public road. There are sewers located within main street to the south of the site and within Seaview Road to the north. The final connection location will be determined by Topography and Scottish Water Preference. Scottish Water Policy requires that there is to be no increase in flow to the existing system up to and including a 1:30 year event. In line with good practice and CIRIA/Local Authority policy it is proposed to intall Rainwater Harvesting as a sustainable method of surface water management for the proposed new roof area. The rainwater harvesting tank is to be used for general garden maintenance, car washing and grey water use within the property (w/c flushing for example). The tank will require an overflow to be attenuated my means of and orifice plate which will discharge to the public sewer. Standard rainwater harvesting sizing based on manufacturers recommendations can be shown as: Cleaning use based on 2.5m3 per person per annum = 7,500Litres Garden water use is estimated as 150Litres/m2 per annum in the UK. Garden size of 150m2 (estimated based on size of proposed plot) = 22,500Litres A buffer storage of 20 Days has been applied. Tank Size is calculated as Deman * Buffer/365 = 1,643Litres To comply with Scottish Water policy, the tank will also require to manage surface water flows up to and including a 1:30year event. Based on a discharge rate of 0.5l/s and a proposed roof area of 150m2 (allowing for extra over), the storage volume required for a 1:30year event with 42% allowance for climate change is 1.89m3. The nearest available standard tank size of 3000litres would be suitable for installation. The final tank design will be a bespoke design carried out by the chosen manufactures to meet the requirements outlined within this report. The current application is for Planning Permission in Principal and therefore the sizing within this report would require to be reviewed following the final house design. Page 120
Page 121
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 6 of 8 Section 4.0 Disclaimer The content of this assessment is for internal use only and should not be distributed to third parties unless under the expressed authority of our client. The designs, recommendations and outline proposals shall remain the property of Mabbett & Associates Ltd and shall not be plagiarised in any form without authority to do so. The comments and recommendations stipulated are solely those expressed by Mabbett & Associates Ltd, and both parties understand that the comments and recommendations expressed are not binding. Mabbett & Associates Ltd confirms that reasonable skill, care, and diligence have been applied and that any design element has been carried out using verifiable and approved reference documentation. No responsibility shall be assumed by Mabbett & Associates Ltd for system failure as a result of incorrect installation work by contractors assigned by the client or incorrect or inappropriate implementation of Mabbett & Associates Ltd’s recommendations. Page 121
Page 122
© 2024, Mabbett & Associates Ltd Section 5.0 References Building (Scotland) Regulations 2004 The Scottish Building Standards: Technical Handbook 2019: Domestic British Standard BS6297:2007 Code of Good Practice for the Design and Installation of Drainage Fields for use in Wastewater Treatment British Water Code of Practice: Flows and Loads 4 - Sizing Criteria, Treatment Capacity for Sewage Wastewater Treatment Systems, 2013 The Water Environment (Controlled Activities) (Scotland) Regulations 2011 SEPA: The Water Environment (Controlled Activities) (Scotland) Regulations 2011 - A Practical Guide) Version 9.2, December 2022. SEPA: Regulatory Method WAT-RM-03: Regulation of Sewage Discharges to Surface Water. SEPA: Regulatory Method WAT-RM-04 Regulation of Indirect Sewage Discharges to Groundwater Environment Act 1995 Page 122
Page 123
© 2024, Mabbett & Associates Ltd Appendix 1 Appendix 1: Test Hole/Location Page 123
Page 124
DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date W illow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn DC 29.4.24 PL01 X 315097 A3 GMNTS Issue Test Hole Location Cummingston Site Adj to Stanes Proposed Dwelling Tulloch of Cummingston - - - - TH01 Page 124
Page 125
© 2024, Mabbett & Associates Ltd Appendix 2 Appendix 2: Storage Calculations Page 125
Page 126
MabbeƩ & Associates Ltd Unit 2 Horizon Scotland Forres Unterprise Park IV36 2AB File: Network: Storm Network Gary Mackintosh 29.04.24 Page 1 Site Adj to Stanes Main Street Cummingston Flow+ v10.6.234 Copyright © 1988-2024 Causeway Technologies Ltd Design Seƫ ngs Rainfall Methodology Return Period (years) AddiƟonal Flow (%) FSR Region M5-60 (mm) RaƟo-R CV Time of Entry (mins) FSR 30 0 Scotland and Ireland 14.000 0.300 0.750 5.00 Maximum Time of ConcentraƟon (mins) Maximum Rainfall (mm/hr) Minimum Velocity (m/s) ConnecƟon Type Minimum Backdrop Height (m) Preferred Cover Depth (m) Include Intermediate Ground Enforce best pracƟce design rules 30.00 50.0 1.00 Level Soĸ ts 0.200 1.200 ✓ ✓ Nodes Name Area (ha) T of E (mins) Cover Level (m) Depth (m) Storage 0.015 5.00 100.000 2.000 SimulaƟon Seƫ ngs Rainfall Methodology FSR Region M5-60 (mm) RaƟo-R Summer CV Winter CV FSR Scotland and Ireland 14.000 0.300 0.750 0.840 Analysis Speed Skip Steady State Drain Down Time (mins) AddiƟonal Storage (m³/ha) Check Discharge Rate(s) Check Discharge Volume Normal x 240 20.0 x x Storm DuraƟons 15 30 60 120 180 240 360 480 600 720 960 1440 Return Period (years) Climate Change (CC %) AddiƟonal Area (A %) AddiƟonal Flow (Q %) 30 42 0 0 Node Storage Online Hydro-Brake® Control Flap Valve Replaces Downstream Link Invert Level (m) Design Depth (m) Design Flow (l/s) x ✓ 97.500 1.000 0.5 ObjecƟve Sump Available Product Number Min Outlet Diameter (m) Min Node Diameter (mm) (HE) Minimise upstream storage ✓ CTL-SHE-0032-5000-1000-5000 0.075 1200 Node Storage Depth/Area Storage Structure Base Inf Coeĸ cient (m/hr) Side Inf Coeĸ cient (m/hr) 0.00000 0.00000 Safety Factor Porosity 2.0 1.00 Invert Level (m) Time to half empty (mins) 98.000 21 Depth (m) Area (m²) Inf Area (m²) Depth (m) Area (m²) Inf Area (m²) Depth (m) Area (m²) Inf Area (m²) 0.000 3.0 0.0 1.000 3.0 0.0 1.001 0.0 0.0 Page 126
Page 127
MabbeƩ & Associates Ltd Unit 2 Horizon Scotland Forres Unterprise Park IV36 2AB File: Network: Storm Network Gary Mackintosh 29.04.24 Page 2 Site Adj to Stanes Main Street Cummingston Flow+ v10.6.234 Copyright © 1988-2024 Causeway Technologies Ltd Results for 30 year +42% CC CriƟcal Storm DuraƟon. Lowest mass balance: 100.00% Node Event US Node Peak (mins) Level (m) Depth (m) InŇow (l/s) Node Vol (m³) Flood (m³) Status Link Event (Upstream Depth) US Node Link Ouƞlow (l/s) Discharge Vol (m³) 60 minute winter Storage 50 98.602 0.602 2.6 1.8964 0.0000 OK 60 minute winter Storage Hydro-Brake® 0.5 3.8 Page 127
Page 128
Page 128
Page 129
Planning Application Drainage Statement March 2024 Author: C Bremner Plot to East of Stanes Cummingston Page 129
Page 130
2 | Stanes, Cummingston: Drainage Statement Contents 1. Introduction 3 2. Proposed Development 3 3. Foul Water Drainage 3 4. Surface Water Drainage 3 5. Construction Phase 4 6. Future Maintenance 4 Appendices Appendix A – Site Location Plan Appendix B – Site Plan Appendix C – Scottish Water Sewer map Page 130
Page 131
3 | Stanes, Cummingston: Drainage Statement 1. Introduction The site is located at Grid reference NJ 13492 69043 (313492E, 869043N), to the East end of Cummingston. Refer to the site location plan provided in Appendix A. The proposed site is bounded by Stanes to the West and Braemore to the East, separated by a grass access lane which is under the applicants ownership. The site is accessed from the B9040 to the South and bound by Seaview Road to the North. 2. Proposed Development It is proposed to split the existing site to create a new house plot of 421sqm to the East of the Existing house (Stanes). Demolish the existing blockwork double garage and form a new vehicle access with off-street parking to serve Stanes. Full details of the proposed are on the attached Site Plan provided in Appendix B. 3. Foul Drainage It is proposed to connect the foul water to the foul drainage public sewer to the South of the Site. Please refer to the Scottish Water Sewer map Appendix C. 4. Surface Water Drainage The roof water from the proposed dwelling will discharge to a surface water soakaway in the rear garden area to the North of the site. The proposed parking area is to be formed with porous paviors. Proposed soakaway location indicated on the Site Plan Appendix B. Page 131
Page 132
4 | Stanes, Cummingston: Drainage Statement 5. Construction Phase The measures for controlling surface water run-off will be continually reviewed in line with each stage of construction and any influencing factors. Consideration is to be given, to surface water run off during and after topsoil strip, after any re- grading of the land and during site construction. Stripping of topsoil and vegetation is to be limited wherever possible and undertaken just prior to the construction in that particular area. This is to reduce run off and to remove silts/fines from the water and aid natural absorption into the soils. The installation of the drains, Suds measures and roadways will follow the earthworks operation continually improving the overall site drainage. Suds facilities will be installed at the outset of the sewer works and will be utilized as temporary sediment control. It is essential these are reinstated or reconstructed at the end of construction works. If required Geotextile membrane will be temporarily inserted into gully frames/silt traps to remove silts prior to entering the surface water system. 6. Future Maintenance The proposed on-site surface water system shall be designed and constructed to the standards set out in Sewers for Scotland (4th Edition) in accordance with good practice. It is proposed that the surface water soakaway and all new drains are maintained by the homeowner. The homeowner will require a suitable maintenance regime and therefore the drainage system should be inspected and maintained. The CIRIA C753 Document provides guidance on the maintenance requirements for Suds features. Please refer to Table 13.1 for maintenance details of the proposed surface water soakaway. Page 132
Page 133
5 | Stanes, Cummingston: Drainage Statement Page 133
Page 134
t - (01343) 835600 f - (01343) 835700 e - info@ tullochofcummingston.co.uk web - www.tullochofcummingston.co.uk Form plot adjacent to Stanes Cummingston Stanes / Loc 01 M AR 2024 DATE DRAWN BY CBDRAWING no. SCALE DRAWING DESCRIPTION 1:1250 (A4) PROJECT Location Plan 0 50m 25m 25m 75m 100m 125m 1:1250 ROAD B 9040 SEAVIEW Greenbrae Cladach House Ancora Veronica 31.7m BM 33.77m Stanes Braemore Laich Co'age Cabrach Co'age Hope 32.8m Light Sea Bay Rowandale Ardgour Bank Drummond 34.2m Avron Dallas Rowan Bank Ferndale Co'age Gull's Morven Co'age Co'age View Kevelaer Croila Cro3s Berryhill Bank El Sub Sta 33.0m View Edoras The Collach Parkend Gull's Co'age Wembley Page 134
Page 135
t - (01343) 835600 f - (01343) 835700 e - info@tullochofcummingston.co.uk web - www.tullochofcummingston.co.uk Form plot adjacent to Stanes Cummingston Stanes / Site 01 M AR 2024 DATE DRAWN BY CBDRAWING no. SCALE DRAW ING DESCRIPTION 1:200 (A3) PROJECT Site Plan Proposed house outline Owned by Applicant B9040SEA E Stanes Braemore h Coage 34.2m 2000 2000 5000 5000 5000 5000 2no. parking spaces for a 3 bedroom house. W hole driveway constructed in paviors Existing garage to be demolished 2no. parking spaces for Existing house. W hole driveway constructed in paviors Drop kerbs at new access to Existing house Exisitng wall and Hedge Access Lane owned by Applicant Exisitng stone wall Grass verge Grass verge Pavement Existing Drop kerbs at access to proposed site FFL - 33.800 FFL - 33.800 Site area - 421sqm Site area - 852sqm 0 4m 4m 8m 12m 16m 20m 1:200 Page 135
Page 136
The representation of physical assets and the boundaries of areas in which Scottish W ater and others have an interest does not necessarily imply their true positions. For further details contact the appropriate District office. © Crown copyright and database rights 2024 OS 100023460. You are granted a non-exclusive, royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes for the period during which Scottish W ater makes it available. You are not permitted to copy, sub-license, distribute, sell or otherwise make available the Licensed Data to third parties in any form. Third party rights to enforce the terms of this licence shall be reserved to OS. Date Plotted: 12/03/2024 SCALE: The Bridge 6 Buchanan Gate Stepps Glasgow G33 6FB Tel No: 08000 778 778 ¯ W arning! Damaging a Large diameter Trunk Main (12"/300 mm and above) can result in loss of life and major W ater Supply and W ater Quality problems. If you're planning any excavation work in the vicinity of any large diameter mains shown on our maps, you MUST contact Scottish W ater to arrange a site visit on Tel No: 08000 778 778 W ELL IN ADVANCE OF THE W ORKS. Plotted By: jamie@ tullochofcummingston.co.uk SW Layout - Stanes 1:661 Page 136
Page 137
Consultation Request Notification Planning Authority Name Moray Council Response Date 1st April 2024 Planning Authority Reference 24/00428/PPP Nature of Proposal (Description) Sub divide site for dwellinghouse and form new vehicle access at Site Stanes Cummingston Elgin Moray IV30 5XY Site Postcode N/A Site Gazetteer UPRN 000133050410 Proposal Location Easting 313483 Proposal Location Northing 869030 Area of application site (M2) 421 Additional Comment Development Hierarchy Level LOCAL Supporting Documentation URL https://publicaccess.moray.gov.uk/eplanning/ce ntralDistribution.do?caseType=Application&ke yVal=SABSUTBGG1200 Previous Application 07/01152/FUL Date of Consultation 18th March 2024 Is this a re-consultation of an existing application? No Applicant Name Mrs I Noble Applicant Organisation Name Applicant Address Stanes Cummingston Elgin Moray IV30 5XY Agent Name Tulloch Of Cummingston Ltd Agent Organisation Name Agent Address Tulloch House Forsyth Street Hopeman Moray IV30 5ST Agent Phone Number Agent Email Address N/A Case Officer Shona Strachan Case Officer Phone number 01343 563303 Case Officer Mobile number 07794 166912 Case Officer email address shona.strachan@moray.gov.uk Page 137
Page 138
PA Response To consultation.planning@moray.gov.uk NOTE: If you do not respond by the response date, it will be assumed that you have no comment to make. The statutory period allowed for a consultation response is 14 days. Due to scheduling pressures if a definitive response is not received within 21 days this may well cause the two month determination period to be exceeded. Data Protection - Moray Council is the data controller for this process. Information collected about you on this form will be used to process your Planning Application, and the Council has a duty to process your information fairly. Information we hold must be accurate, up to date, is kept only for as long as is necessary and is otherwise shared only where we are legally obliged to do so. You have a legal right to obtain details of the information that we hold about you. For full terms please visit http://www.moray.gov.uk/moray_standard/page_121513.html For full Data Protection policy, information and rights please see http://www.moray.gov.uk/moray_standard/page_119859.html You can contact our Data Protection Officer at info@moray.gov.uk or 01343 562633 for more information. Please respond using the attached form:- Page 138
Page 139
MORAY COUNCIL PLANNING CONSULTATION RESPONSE From: Aberdeenshire Council Archaeology Service Planning Application Ref. No: 24/00428/PPP Sub divide site for dwellinghouse and form new vehicle access at Stanes Cummingston Elgin Moray for Mrs I Noble I have the following comments to make on the application:- Please x (a) I OBJECT to the application for the reason(s) as stated below ❑ (b) I have NO OBJECTIONS to the application and have no condition(s) and/or comment(s) to make on the proposal X (c) I have NO OBJECTIONS to the application subject to condition(s) and/or comment(s) about the proposal as set out below ❑ (d) Further information is required in order to consider the application as set out below ❑ Reason(s) for objection None Condition(s) None Further comment(s) to be passed to applicant Further information required to consider the application Contact: Claire Herbert Date…26/03/2024………………….. email address: archaeology@aberdeenshire.gov.uk Phone No ……01467537717 Consultee: Archaeology service Page 139
Page 140
Return response to consultation.planning@moray.gov.uk Please note that information about the application including consultation responses and representations (whether in support or objection) received on the proposal will be published on the Council’s website at http://publicaccess.moray.gov.uk/eplanning/ (You can also use this site to track progress of the application and view details of any consultation responses and representations (whether in support or objection) received on the proposal). In order to comply with the Data Protection Act, personal information including signatures, personal telephone and email details will be removed prior to publication using “redaction” software to avoid (or mask) the display of such information. Where appropriate other “sensitive” information within documents will also be removed prior to publication online. Page 140
Page 141
Consultee Comments for Planning Application 24/00428/PPP Application Summary Application Number: 24/00428/PPP Address: Stanes Cummingston Elgin Moray IV30 5XY Proposal: Sub divide site for dwellinghouse and form new vehicle access at Case Officer: Shona Strachan Consultee Details Name: Mr CL Consultations Address: Environmental Health, Council Offices, High Street Elgin, Moray IV30 1BX Email: Not Available On Behalf Of: Contaminated Land Comments Approved unconditionally - Allan Park Page 141
Page 142
Page 142
Page 143
From: Teresa Ruggeri <Teresa.Ruggeri@moray.gov.uk> Sent: 25 Mar 2024 10:41:47 To: DMSMyEmail@moray.gov.uk Cc: Subject: FW: 24/00428/PPP Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston, Elgin, IV30 5XY Attachments: 24-00428-PPP Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston, Elgin, IV30 5XY.pdf From: DeveloperObligations <DeveloperObligations@moray.gov.uk> Sent: Wednesday, March 20, 2024 9:46 AM To: Shona Strachan <Shona.Strachan@moray.gov.uk> Cc: DC-General Enquiries <development.control@moray.gov.uk> Subject: 24/00428/PPP Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston, Elgin, IV30 5XY Hi Please find attached the developer obligations assessment that has been undertaken for the above planning application. A copy of the report has been sent to the applicant. Thanks, Rebecca Rebecca Morrison| Infrastructure Growth/Obligations Officer (Strategic Planning and Development) | Economic Growth and Development 07971879253 / 01343 563583 rebecca.morrison@moray.gov.uk | website | facebook | twitter | instagram | news Page 143
Page 144
Page 144
Page 145
Developer Obligations & Affordable Housing: ASSESSMENT REPORT Date: 20/03/2024 Reference: 24/00428/PPP Description: Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston, Elgin, IV30 5XY Applicant: Mrs I Noble Agent: Tulloch Of Cummingston Ltd This assessment has been carried out by Moray Council. For developer obligations, the assessment is carried out in relation to policy PP3 Infrastructure and Services of the adopted Moray Local Development Plan 2020 (MLDP2020) and Supplementary Guidance (SG) on Developer Obligations which was adopted on 30 September 2020. And, for affordable housing, the assessment is carried out in relation to policy DP2 Housing of the MLDP2020. Affordable housing is a policy requirement not a developer obligation however for ease of reference the Affordable Housing contribution is included within this assessment. The MLDP2020 can be found at www.moray.gov.uk/MLDP2020 and the Developer Obligations SG can be found at http://www.moray.gov.uk/downloads/file1 34184.pdf Summary of Obligations Primary Education Nil Secondary Education Nil Transport (Contribution towards Demand Responsive Transport) Healthcare (Contribution towards extension at Moray Coast Medical Practice or such other healthcare facilities for which the Council is able to demonstrate reasonable justification and will serve the residents of the Development) Sports and Recreation Nil Total Developer Obligations Affordable Housing TOTAL Breakdown of Calculation Proposals for developer obligations are assessed on the basis of Standard Residential Unit Equivalents (SRUE) which is a 3- bedroomed residential unit. This application is considered to comprise of the following: 3 bed = 1 SRUE Page 145
Page 146
This assessment is therefore based on 1 SRUE. INFRASTRUCTURE Education Primary Education The pupils generated by this development are zoned to Hopeman Primary School. The school is currently operating at 53% physical capacity and the additional pupil as a result of this development can be accommodated. As a result, no mitigation is necessary in this instance. Contribution towards Primary Education = Nil Secondary Education The pupils generated by this development are zoned to x High School. The school is currently operating at 86% capacity and the additional pupil as a result of this development can be accommodated. As a result, no mitigation is necessary in this instance. Contribution towards Secondary Education = Nil Transport The Moray Council Transportation Services has confirmed that a contribution towards the Council`s demand responsive transport service is required to mitigate the impact, in terms of increased usage, on this service given the proposed development is located within a rural area with no access to bus services. In accord with the Moray Council`s Supplementary Guidance on Developer Obligations, a contribution of per SRUE is sought. Therefore: Contributions towards Transport = Healthcare Healthcare Facilities include General Medical Services (GMS), community pharmacies and dental practices. Scottish Health Planning Notes provide national guidance on standards and specification for healthcare facilities. The recommended number of patients is 1500 per General Practitioner (GP) and floorspace requirement per GP is 271m2. Healthcare infrastructure requirements have been calculated with NHS Grampian on the basis of national standards and specifications for healthcare facilities and estimating the likely number of new patients generated by the development (based on the average household size of 2.17 persons -Census 2011). Moray Coast Medical Practice is the nearest GP Practice within which healthcare facilities can be accessed by the proposed development. NHS Grampian has confirmed that Moray Coast Medical Practice is currently working beyond design capacity and existing space will be required to be extended. Contributions are calculated based on a proportional contribution of per SRUE for the extension of the health center or such other healthcare facilities for which the Council is able to demonstrate reasonable justification and will serve the residents of the Development. Contribution towards Healthcare = Page 146
Page 147
Sports and Recreational Facilities Existing sports provision within Lossiemouth is considered to be adequate to serve the needs of the residents anticipated to be generated by this development. Therefore, in this instance, no contribution will be required. Contribution for Sports and Recreation Facilities = Nil AFFORDABLE HOUSING The average market value of a serviced plot for 1 Affordable Unit within the Elgin local Housing Market Area is Contributions are based on 25% of the total number of units proposed in the application: Therefore, the total contribution towards affordable housing is: Affordable housing is a policy requirement not a developer obligation and will not be subject to negotiation. Page 147
Page 148
TERMS OF ASSESSMENT This assessment report is valid for a period of 6 months from the date of issue. Please note that any subsequent planning applications for this site may require a re- assessment to be undertaken on the basis of the policies and rates pertaining at that time. PAYMENT OF CONTRIBUTIONS Remittance of financial obligations can be undertaken either through the provision of an upfront payment or by entering into a Section 75 agreement. The provision of an upfront payment will allow a planning consent to be issued promptly. However, where the amount of developer contributions are such that an upfront payment may be considered prohibitive a Section 75 will likely be required. The payment of contributions may be tied into the completion of houses through a Section 75 Agreement or equivalent, to facilitate the delivery of development. Please note that Applicants are liable for both the legal costs of their own Legal Agent fees and Council’s legal fees and outlays in the preparation of the document. These costs should be taken into account when considering the options. INDEXATION Developer obligations towards Moray Council infrastructure are index linked to the General Building Cost Price Index (BCPI) as published by the Building Cost Information Service (BCIS) of the Royal Institute of Chartered Surveyors (RICS) from Q3, 2017 and obligations towards NHS Grampian infrastructure are index linked to All in Tender Price Index (TPI) as published by the Royal Institute of Chartered Surveyors (RICS) from Q2, 2017. Page 148
Page 149
MORAY COUNCIL PLANNING CONSULTATION RESPONSE From: The Moray Council, Flood Risk Management Planning Application Ref. No: 24/00428/PPP I have the following comments to make on the application:- Please x (a) I OBJECT to the application for the reason(s) as stated below (b) I have NO OBJECTIONS to the application and have no condition(s) and/or comment(s) to make on the proposal (c) I have NO OBJECTIONS to the application subject to condition(s) and/or comment(s) about the proposal as set out below (d) Further information is required in order to consider the application as set out below Condition(s) A full surface water drainage design must be submitted with any full application. This should detail the grey water system integration. Contact: James Ross Date 26/06/2024 email address: James.ross@moray.gov.uk Phone No Consultee: The Moray Council, Flood Risk Management Page 149
Page 150
Page 150
Page 151
S W Pu bli Thursday, 28 March 2024 Local Planner Development Services Moray Council Elgin IV30 1BX Dear Customer, Stanes, Cummingston, Elgin, IV30 5XY Planning Ref: 24/00428/PPP Our Ref: DSCAS-0106741-CNF Proposal: Sub divide site for dwellinghouse and form new vehicle access Please quote our reference in all future correspondence Audit of Proposal Scottish Water has no objection to this planning application; however, the applicant should be aware that this does not confirm that the proposed development can currently be serviced. Please read the following carefully as there may be further action required. Scottish Water would advise the following: Water Capacity Assessment Scottish Water has carried out a Capacity review and we can confirm the following: This proposed development will be fed from Glenlatterach Water Treatment Works. Unfortunately, Scottish Water is unable to confirm capacity currently so to allow us to fully appraise the proposals we suggest that the applicant completes a Pre- Development Enquiry (PDE) Form and submits it directly to Scottish Water via our Customer Portal or contact Development Operations. Waste Water Capacity Assessment There is currently sufficient capacity for a foul only connection in the Moray West Waste Water Treatment works to service your development. However, please note that further investigations may be required to be carried out once a formal application has been submitted to us. Development Operations The Bridge Buchanan Gate Business Park Cumbernauld Road Stepps Glasgow G33 6FB Development Operations Freephone Number - 0800 3890379 E-Mail - DevelopmentOperations@scottishwater.co.uk www.scottishwater.co.uk Page 151
Page 152
S W Pu bli Please Note The applicant should be aware that we are unable to reserve capacity at our water and/or waste water treatment works for their proposed development. Once a formal connection application is submitted to Scottish Water after full planning permission has been granted, we will review the availability of capacity at that time and advise the applicant accordingly. Surface Water For reasons of sustainability and to protect our customers from potential future sewer flooding, Scottish Water will not accept any surface water connections into our combined sewer system. There may be limited exceptional circumstances where we would allow such a connection for brownfield sites only, however this will require significant justification from the customer taking account of various factors including legal, physical, and technical challenges. In order to avoid costs and delays where a surface water discharge to our combined sewer system is anticipated, the developer should contact Scottish Water at the earliest opportunity with strong evidence to support the intended drainage plan prior to making a connection request. We will assess this evidence in a robust manner and provide a decision that reflects the best option from environmental and customer perspectives. General notes: Scottish Water asset plans can be obtained from our appointed asset plan providers: Site Investigation Services (UK) Ltd Tel: 0333 123 1223 Email: sw@sisplan.co.uk www.sisplan.co.uk Scottish Water’s current minimum level of service for water pressure is 1.0 bar or 10m head at the customer’s boundary internal outlet. Any property which cannot be adequately serviced from the available pressure may require private pumping arrangements to be installed, subject to compliance with Water Byelaws. If the developer wishes to enquire about Scottish Water’s procedure for checking the water pressure in the area, then they should write to the Customer Connections department at the above address. If the connection to the public sewer and/or water main requires to be laid through land out-with public ownership, the developer must provide evidence of formal approval from the affected landowner(s) by way of a deed of servitude. Scottish Water may only vest new water or waste water infrastructure which is to be laid through land out with public ownership where a Deed of Servitude has been obtained in our favour by the developer. Page 152
Page 153
S W Pu bli The developer should also be aware that Scottish Water requires land title to the area of land where a pumping station and/or SUDS proposed to vest in Scottish Water is constructed. Please find information on how to submit application to Scottish Water at our Customer Portal. Next Steps: All Proposed Developments All proposed developments require to submit a Pre-Development Enquiry (PDE) Form to be submitted directly to Scottish Water via our Customer Portal prior to any formal Technical Application being submitted. This will allow us to fully appraise the proposals. Where it is confirmed through the PDE process that mitigation works are necessary to support a development, the cost of these works is to be met by the developer, which Scottish Water can contribute towards through Reasonable Cost Contribution regulations. Non Domestic/Commercial Property: Since the introduction of the Water Services (Scotland) Act 2005 in April 2008 the water industry in Scotland has opened to market competition for non-domestic customers. All Non-domestic Household customers now require a Licensed Provider to act on their behalf for new water and waste water connections. Further details can be obtained at www.scotlandontap.gov.uk Trade Effluent Discharge from Non-Domestic Property: Certain discharges from non-domestic premises may constitute a trade effluent in terms of the Sewerage (Scotland) Act 1968. Trade effluent arises from activities including; manufacturing, production and engineering; vehicle, plant and equipment washing, waste and leachate management. It covers both large and small premises, including activities such as car washing and launderettes. Activities not covered include hotels, caravan sites or restaurants. If you are in any doubt as to whether the discharge from your premises is likely to be trade effluent, please contact us on 0800 778 0778 or email TEQ@scottishwater.co.uk using the subject “Is this Trade Effluent?". Discharges that are deemed to be trade effluent need to apply separately for permission to discharge to the sewerage system. The forms and application guidance notes can be found here. Trade effluent must never be discharged into surface water drainage systems as these are solely for draining rainfall run off. For food services establishments, Scottish Water recommends a suitably sized grease trap is fitted within the food preparation areas, so the Page 153
Page 154
S W Pu bli development complies with Standard 3.7 a) of the Building Standards Technical Handbook and for best management and housekeeping practices to be followed which prevent food waste, fat oil and grease from being disposed into sinks and drains. The Waste (Scotland) Regulations which require all non-rural food businesses, producing more than 5kg of food waste per week, to segregate that waste for separate collection. The regulations also ban the use of food waste disposal units that dispose of food waste to the public sewer. Further information can be found at www.resourceefficientscotland.com I trust the above is acceptable however if you require any further information regarding this matter please contact me on 0800 389 0379 or via the e-mail address below or at planningconsultations@scottishwater.co.uk. Yours sincerely, Angela Allison Development Services Analyst PlanningConsultations@scottishwater.co.uk Scottish Water Disclaimer: “It is important to note that the information on any such plan provided on Scottish Water’s infrastructure, is for indicative purposes only and its accuracy cannot be relied upon. When the exact location and the nature of the infrastructure on the plan is a material requirement then you should undertake an appropriate site investigation to confirm its actual position in the ground and to determine if it is suitable for its intended purpose. By using the plan you agree that Scottish Water will not be liable for any loss, damage or costs caused by relying upon it or from carrying out any such site investigation." Page 154
Page 155
Consultation Request Notification Planning Authority Name Moray Council Response Date 1st April 2024 Planning Authority Reference 24/00428/PPP Nature of Proposal (Description) Sub divide site for dwellinghouse and form new vehicle access at Site Stanes Cummingston Elgin Moray IV30 5XY Site Postcode N/A Site Gazetteer UPRN 000133050410 Proposal Location Easting 313483 Proposal Location Northing 869030 Area of application site (M2) 421 Additional Comment Development Hierarchy Level LOCAL Supporting Documentation URL https://publicaccess.moray.gov.uk/eplanning/ce ntralDistribution.do?caseType=Application&ke yVal=SABSUTBGG1200 Previous Application 07/01152/FUL Date of Consultation 18th March 2024 Is this a re-consultation of an existing application? No Applicant Name Mrs I Noble Applicant Organisation Name Applicant Address Stanes Cummingston Elgin Moray IV30 5XY Agent Name Tulloch Of Cummingston Ltd Agent Organisation Name Agent Address Tulloch House Forsyth Street Hopeman Moray IV30 5ST Agent Phone Number Agent Email Address N/A Case Officer Shona Strachan Case Officer Phone number 01343 563303 Case Officer Mobile number 07794 166912 Case Officer email address shona.strachan@moray.gov.uk PA Response To consultation.planning@moray.gov.uk NOTE: Page 155
Page 156
If you do not respond by the response date, it will be assumed that you have no comment to make. The statutory period allowed for a consultation response is 14 days. Due to scheduling pressures if a definitive response is not received within 21 days this may well cause the two month determination period to be exceeded. Data Protection - Moray Council is the data controller for this process. Information collected about you on this form will be used to process your Planning Application, and the Council has a duty to process your information fairly. Information we hold must be accurate, up to date, is kept only for as long as is necessary and is otherwise shared only where we are legally obliged to do so. You have a legal right to obtain details of the information that we hold about you. For full terms please visit http://www.moray.gov.uk/moray_standard/page_121513.html For full Data Protection policy, information and rights please see http://www.moray.gov.uk/moray_standard/page_119859.html You can contact our Data Protection Officer at info@moray.gov.uk or 01343 562633 for more information. Please respond using the attached form:- Page 156
Page 157
MORAY COUNCIL PLANNING CONSULTATION RESPONSE From: Transportation Manager Planning Application Ref. No: 24/00428/PPP Sub divide site for dwellinghouse and form new vehicle access at Stanes Cummingston Elgin Moray for Mrs I Noble I have the following comments to make on the application:- Please (a) I OBJECT to the application for the reason(s) as stated below ❑ (b) I have NO OBJECTIONS to the application and have no condition(s) and/or comment(s) to make on the proposal ❑ (c) I have NO OBJECTIONS to the application subject to condition(s) and/or comment(s) about the proposal as set out below x (d) Further information is required in order to consider the application as set out below ❑ This proposal is to subdivide an existing properties garden ground to provide a new 3 bed dwelling via the removal of an existing double garage, with the existing vehicular access retained for the new property, and a new access formed for the original property. No alterations (other than the formation of the new access) are proposed to the existing boundary fronting onto the B9040 Main Road which is already set back well behind the public footway. The following conditions would apply: Condition(s) 1. Notwithstanding the submitted details, prior to the first occupation of the new dwelling house, drop kerbs shall be provided across the new access to The Moray Council specification. The width of the new vehicular access shall be minimum 3.5m and have a maximum gradient of 1:20 measured for the first 5.0m from the edge of the public carriageway. Reason: To ensure acceptable infrastructure at the development access 2. Parking provision shall be as follows: • 2 spaces for a new dwelling with two or three bedrooms; or • 3 spaces for a new dwelling with four bedrooms or more; and • 2 spaces retained for the existing dwelling. The car parking spaces shall be provided within the site prior to the occupation or completion of the new dwelling house, whichever is the sooner. The parking spaces shall thereafter be retained throughout the lifetime of the development, unless otherwise agreed in writing with the Council as Planning Authority. Reason: To ensure the permanent availability of the level of parking necessary for residents/visitors/others in the interests of an acceptable development and road safety. 3. No boundary fences, hedges, walls or any other obstruction whatsoever over 1.0m in height (measured from the level of the road) and fronting onto the public road shall be within 2.4m of the edge of the public carriageway. Page 157
Page 158
Reason: To enable drivers of vehicles entering or exiting the site(s) to have a clear view so that they can undertake the manoeuvre safely and with the minimum interference to the safety and free flow of traffic on the public road. 4. New boundary walls/fences shall be set back from the edge of the public carriageway at a distance of as existing. Reason: To ensure acceptable development in the interests of road safety. 5. No water shall be permitted to drain or loose material be carried onto the public footway/carriageway. Reason: To ensure the safety and free flow of traffic on the public road and access to the site by minimising the road safety impact from extraneous material and surface water in the vicinity of the new access Further comment(s) to be passed to applicant Planning consent does not carry with it the right to carry out works within the public road boundary. Before starting any work on the existing public road the applicant is obliged to apply for a road opening permit in accordance with Section 56 of the Roads (Scotland) Act 1984. This includes any temporary access joining with the public road. Advice on these matters can be obtained by emailing roadspermits@moray.gov.uk Public utility apparatus may be affected by this proposal. Contact the appropriate utility service in respect of any necessary utility service alterations which have to be carried out at the expense of the developer. Note – although the proposed driveway/parking area for the parent property reflects the current arrangement, given the available space within the retained site it would be recommend that the proposed driveway be extended in width to provide a turning area such that vehicles are able to enter and exit onto the public road in a forward gear. Note – Electric Vehicle (EV) charger infrastructure would require to be provided for the new property; however, for clarity the EV details shall be assessed separately as part of any associated building warrant submission. Guidance on Electric Vehicle (EV) Charging requirements can be found at: http://www.moray.gov.uk/downloads/file134860.pdf No building materials/scaffolding/builder’s skip shall obstruct the public road (including footpaths) without permission from the Roads Authority. The applicant shall free and relieve the Roads Authority from any claims arising out of their operations on the road or extension to the road. Contact: AG Date 26 March 2024 email address: transport.develop@moray.gov.uk Consultee: TRANSPORTATION Return response to consultation.planning@moray.gov.uk Please note that information about the application including consultation responses and representations (whether in support or objection) received on the proposal will be published on the Council’s website at http://publicaccess.moray.gov.uk/eplanning/ (You can also use this site to track progress of the application and view details of any consultation responses and representations (whether in support or objection) received on the proposal). In order to comply with the Data Protection Act, personal information including signatures, personal telephone and email details will be removed prior to publication using “redaction” software to avoid (or mask) the display of such information. Where appropriate other “sensitive” information within documents will also be removed prior to publication online. Page 158
Page 159
Consultee Comments for Planning Application 24/00428/PPP Application Summary Application Number: 24/00428/PPP Address: Stanes Cummingston Elgin Moray IV30 5XY Proposal: Sub divide site for dwellinghouse and form new vehicle access at Case Officer: Shona Strachan Consultee Details Name: Mr EH Consultations Address: Environmental Health, Council Offices, High Street Elgin, Moray IV30 1BX Email: Not Available On Behalf Of: Environmental Health C12 Comments Approved unconditionally - Andrew Stewart Page 159
Page 160
Page 160
Page 161
REPORT OF HANDLING Ref No: 24/00428/PPP Officer: Shona Strachan Proposal Description/ Address Sub divide site for dwellinghouse and form new vehicle access at Stanes Cummingston Elgin Moray Date: 04/07/2024 Typist Initials: DJP RECOMMENDATION Approve, without or with condition(s) listed below N Refuse, subject to reason(s) listed below Y Legal Agreement required e.g. S,75 N Notification to Scottish Ministers/Historic Scotland N Hearing requirements Departure N Pre-determination N CONSULTATIONS Consultee Date Returned Summary of Response Moray Flood Risk Management 26/06/24 No objection subject to a condition which would require a full detailed drainage design with any detailed planning application which should detail the grey water system integration. Planning And Development Obligations 20/03/24 Developer Obligations Assessment identifies obligations towards: Demand Response Transport Healthcare Affordable Housing Contribution is also required. Environmental Health Manager 18/03/24 No objection Contaminated Land 21/03/24 No objection Transportation Manager 26/03/24 No objection subject to conditions for safe access and parking. Scottish Water 28/03/24 No objection subject to their Pre- Development Enquiry Process at the appropriate juncture. Aberdeenshire Council Archaeology Service 26/03/24 No objections DEVELOPMENT PLAN POLICY Policies Dep Any Comments (or refer to Observations below) National Planning Framework 2023 NPF1 - Tackling the Climate N Page 161
Page 162
Page 2 of 6 NPF2 - Climate mitigation and adaptation N NPF3 - Biodiversity N NPF4 - Natural Places Y NPF5 - Soils N NPF12 - Zero waste N NPF13 - Sustainable transport N NPF14 - Design, quality and place Y NPF16 - Quality homes Y NPF18 - Infrastructure first N NPF20 - Blue and green infrastructure N NPF22 - Flood risk N NPF23 - Health and safety N Moray Local Development Plan 2020 PP3 Infrastructure and Services N DP1 Development Principles Y DP2 Housing N EP3 Special Landscape Areas Y EP12 Management and Enhancement Water N EP14 Pollution Contamination Hazards N EP13 Foul Drainage N REPRESENTATIONS Representations Received YES Total number of representations received: ONE Names/Addresses of parties submitting representations Name and address details of parties submitting representations withheld in accordance with the General Data Protection Regulations. Summary and Assessment of main issues raised by representations Issue: This proposal will completely ruin view. Comments (PO): There is no right to a view in planning terms. It is not a material consideration. Issue: Noise of construction will cause a huge burden to our ability to work from home. Comments (PO): Whilst it is acknowledged that building works can cause noise disruption, this is of a timebound nature and measures can be put in place to control hours of works etc. Ultimately construction noise is not a material planning reason to refuse a planning application. Page 162
Page 163
Page 3 of 6 Issue: Carnan has been missed off the plan between Avron Bank and Edoras. Comments (PO): The purpose of the location plan is to identify the application site. The location plan meets the requirements to do this and meets the requirements of the planning application validation. OBSERVATIONS – ASSESSMENT OF PROPOSAL Legislative Framework Section 25 of the 1997 Act as amended requires applications to be determined in accordance with the development plan, namely the adopted National Planning Framework 4 and adopted Moray Local Development Plan 2020 (MLDP 2020) unless material considerations indicate otherwise. The main planning issues are considered below: Proposal This application seeks planning permission in principle to sub divide existing house site for dwellinghouse and form new vehicle access at Stanes Cummingston. As this is an application for planning permission in principle detailed design information has not been provided. The site plan does show an indicative position and footprint for the proposed dwelling and also shows the site access, as well as a new access to be formed for the existing property. During the course of the application an amended site plan was submitted to show a reduced house footprint. This plan is indicative and forms the basis for this assessment. The site plan also shows the position and footprint of the existing garage which is to be removed. The proposed dwelling is shown to be sited over the footprint of the garage. Drainage is to be connected to the existing mains pipes with a rain water harvesting system to be installed on site, this grey water can be used for W/C flushing and garden maintenance. Access will be to the south onto the main B9040 public road, the proposal would entail the installation of a new access for the existing property. Site The property Stanes is a traditionally designed and proportioned single storey dwelling positioned centrally within its plot. Whilst the property is not listed it does have an elegance arising from its traditional design and setting within the plot. As shown on the site plan, under this proposal the existing property would be sub divided to the east of the site and would entail the removal of the existing flat roofed garage with the proposed house to be positioned at this location. Beyond the site boundary to the east is a narrow access lane with the existing neighbouring property beyond, this eastward neighbouring property is a narrow spanned small proportioned cottage. The public road is to the south of the site which is lined with existing properties and the parent to the west. The garden ground of the property extents to the north and includes a change in level. Under the terms of the MLDP 2020 Cummingston falls with the Burghead to Lossiemouth Coast Special Landscape Area. Policy Assessment Siting and Impact of the Development NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b NPF4 Policy 14 requires that development proposals be designed to improve the quality of an area whether in urban or rural locations and regardless of scale. It also states that development proposals will be supported where they are consistent with the six qualities of successful places; Healthy, Page 163
Page 164
Page 4 of 6 Pleasant, Connected, Distinctive, Sustainable and Adaptable. NPF Policy 14 states that proposals which are poorly designed, detrimental to the amenity of the surrounding area or inconsistent with the six qualities of successful places will not be supported. NPF Policy 16 is supportive of quality homes for proposals which are for small scale opportunities within existing settlement boundaries. Policy DP1, part f) sets out specific requirements for sub divide garden plots. Specifying that: proposals do not result in backland development or plots that are subdivided by more than 50% of the original plot. Sub-divided plots must be a minimum of 400m2, excluding access and the built-up area of the application site will not exceed one-third of the total area of the plot and advises that the resultant plot density and layout reflects the character of the surrounding area. Policies NPF4 and MLDP (EP3) Policy EP3 seek to preserve special landscape areas, specifically Policy EP3 part b) applies to urban areas and requires proposal to meet the relevant terms of Policy DP1 and to reflect the traditional settlement character in terms of siting and design. The existing property Stanes is a traditionally designed and proportioned single storey dwelling positioned centrally within its plot. Whilst the property is not listed it does have an elegant pleasantness arising from its traditional design and its position centrally within the plot. The proposal to remove an existing inconsequential ancillary garage and sub divide the garden ground to create an additional house site in the grounds of the existing dwelling would appear cramped and incongruous to the existing layout and fail to reflect and respect the existing character of the site. The proposal would therefore be detrimental to the character of the site and its surrounds which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics for all development. As a result, the existing garden ground of the property Stanes is not considered to be a suitable sub divide house plot. The proposal therefore fails to comply with NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) Design and Amenity Considerations NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b As detailed above, whilst it is considered that the proposal would undermine the existing high quality character of the site, it is recommended that should the application go on to be approved that any house design should be of restricted height and limited footprint with traditional materials and finish. This is to help ensure an acceptable design and appearance and limit amenity impacts in relation to any over bearing impacts from a dwelling being sited in an existing garden. However, these matters are considered separate from and does not override the policy objection to the proposal based on the inappropriate siting of the proposal. Water and Drainage NPF 20 & 22 / MLDP 12 & 13 Scottish Water has confirmed no objection to the proposal and any connections required for drinking and foul connection would be the subject of separate liaison between the applicant and Scottish Water at the appropriate juncture should the application go on to be approved. The application has been supported by a drainage assessment which has been accepted by Moray Flood Risk Management the surface water drainage proposal is considered acceptable for planning permission in principle and further details would be sought as part of any future detailed application. Compliance with Drainage requirements is separate from and does not override the policy objection to this proposal based on its inappropriate siting. Access and Parking NPF 13 / MLDP DP1 The Transportation Manager has raised no objection to the proposal subject to conditions for safe secure access for the existing and proposed dwelling. The Transportation Manager, is satisfied that Page 164
Page 165
Page 5 of 6 these can be achieved. However, this is separate from the policy objection to the proposal based on its unacceptable siting. Developer Obligations and Affordable Housing NPF 18 / MLDP PP3 & DP1 The Assessment identifies that Developer Obligations towards demand responsive transport and healthcare is required. An affordable housing contribution is also required. The applicant has confirmed willingness to accept the obligations and the contribution, these aspects would be secured by a Section 75 Agreement should the application go on to be approved. The proposal would therefore acceptable under the requisite requirements of policies. However, this is separate from the policy objection to the proposal based on its unacceptable siting. Climate Change, Soils and Biodiversity NPF 1, 2, 3 & 5 The proposal seeks to further develop an already developed house site within an existing settlement boundary. Therefore the proposal is not considered to be significantly detrimental to the global nature and climate crisis. Specific requirements for biodiversity enhancement could be requested as part of any detailed design proposals. However, these matters are separate from and do not override the unacceptable siting of the development. Conclusion and Recommendation In this instance, the proposal has failed to comply with the terms of Policies NPF Policies 14 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b). The proposal for the subdivision of garden ground to create an additional dwelling would fail to reflect and respect the character of the site and therefore would be detrimental to the character of the site and the surrounding area which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics to be achieved. OTHER MATERIAL CONSIDERATIONS TAKEN INTO ACCOUNT N/A HISTORY Reference No. Description Take down and replace existing timber conservatory with new UPVC conservatory at Stanes Cummingston Burghead Elgin Moray 07/01152/FUL Decision Permitted Date Of Decision 03/07/07 ADVERT Advert Fee paid? N/A Local Newspaper Reason for Advert Date of expiry DEVELOPER CONTRIBUTIONS (PGU) Status CONT SOUGHT Page 165
Page 166
Page 6 of 6 DOCUMENTS, ASSESSMENTS etc. * * Includes Environmental Statement, Appropriate Assessment, Design Statement, Design and Access Statement, RIA, TA, NIA, FRA etc Supporting information submitted with application? YES Summary of main issues raised in each statement/assessment/report Document Name: Drainage Assessment Main Issues: Provides detail of proposed drainage design which will include a grey water system. . S.75 AGREEMENT Application subject to S.75 Agreement NO Summary of terms of agreement: Location where terms or summary of terms can be inspected: DIRECTION(S) MADE BY SCOTTISH MINISTERS (under DMR2008 Regs) Section 30 Relating to EIA NO Section 31 Requiring planning authority to provide information and restrict grant of planning permission NO Section 32 Requiring planning authority to consider the imposition of planning conditions NO Summary of Direction(s) Page 166
Page 167
Page 167
Page 168
(Page 2 of 3) Ref: 24/00428/PPP IMPORTANT YOUR ATTENTION IS DRAWN TO THE REASONS and NOTES BELOW SCHEDULE OF REASON(S) FOR REFUSAL By this Notice, the Moray Council has REFUSED this proposal. The Councils reason(s) for this decision are as follows: - The proposal is contrary to the provisions of Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan because: The proposal to create an additional house site in the garden grounds of the existing parent property Stanes would appear incongruous to the existing site layout and fail to reflect and respect the existing character of the site. The proposal would therefore have a detrimental impact on the quality of the built environment at this site and be detrimental to the character and surrounding area which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics for all development. The proposal would therefore be contrary to Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan. LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT The following plans and drawings form part of the decision:- Reference Version Title STANES/SITE01 Site plan STANES/LOC01 Location plan STANES/VIS01 Visibility splay DETAILS OF ANY VARIATION MADE TO ORIGINAL PROPOSAL, AS AGREED WITH APPLICANT (S.32A of 1997 ACT) Amended site plan submitted showing a reduced house footprint. NOTICE OF APPEAL TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 If the applicant is aggrieved by the decision to refuse permission for or approval required by a condition in respect of the proposed development, or to grant permission or approval subject to conditions, the applicant may require the planning authority to review the case under section 43A of the Town and Country Planning (Scotland) Act 1997 within three months from the date of this notice. The notice of review should be addressed to The Clerk, Moray Council Local Review Body, Legal and Committee Services, Council Offices, High Street, Elgin IV30 1BX. This form is Page 168
Page 169
(Page 3 of 3) Ref: 24/00428/PPP also available and can be submitted online or downloaded from www.eplanning.scot/eplanningClient If permission to develop land is refused or granted subject to conditions and the owner of the land claims that the land has become incapable of reasonably beneficial use in its existing state and cannot be rendered capable of reasonably beneficial use by the carrying out of any development which has been or would be permitted, the owner of the land may serve on the planning authority a purchase notice requiring the purchase of the owner of the land’s interest in the land in accordance with Part 5 of the Town and Country Planning (Scotland) Act 1997. Page 169
Page 170
Page 170
Page 171
APPENDIX 2 NOTICE OF REVIEW, GROUNDS FOR REVIEW & SUPPORTING DOCUMENTS Page 171
Page 172
Page 172
Page 173
Page 1 of 5 The Moray Council Council Office High Street Elgin IV30 1BX Tel: 0300 1234561 Email: development.control@moray.gov.uk Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid. Thank you for completing this application form: ONLINE REFERENCE 100664541-004 The online reference is the unique reference for your online form only. The Planning Authority will allocate an Application Number when your form is validated. Please quote this reference if you need to contact the planning Authority about this application. Applicant or Agent Details Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting on behalf of the applicant in connection with this application) Applicant Agent Agent Details Please enter Agent details Company/Organisation: Ref. Number: You must enter a Building Name or Number, or both: * First Name: * Building Name: Last Name: * Building Number: Address 1 Telephone Number: * (Street): * Extension Number: Address 2: Mobile Number: Town/City: * Fax Number: Country: * Postcode: * Email Address: * Is the applicant an individual or an organisation/corporate entity? * Individual Organisation/Corporate entity Tulloch of Cummingston Ltd Christopher Bremner Tulloch House Tulloch House 01343 835600 IV30 5ST United Kingdom Elgin Forsyth street Christopher@tullochofcummingston.co.uk Page 173
Page 174
Page 2 of 5 Applicant Details Please enter Applicant details Title: You must enter a Building Name or Number, or both: * Other Title: Building Name: First Name: * Building Number: Address 1 Last Name: * (Street): * Company/Organisation Address 2: Telephone Number: * Town/City: * Extension Number: Country: * Mobile Number: Postcode: * Fax Number: Email Address: * Site Address Details Planning Authority: Full postal address of the site (including postcode where available): Address 1: Address 2: Address 3: Address 4: Address 5: Town/City/Settlement: Post Code: Please identify/describe the location of the site or sites Northing Easting Mrs STANES I Moray Council Noble CUMMINGSTON Cummingston Stanes ELGIN IV30 5XY IV30 5XY Scotland 869030 Hopeman 313483 christopher@tullochofcummingston.co.uk Page 174
Page 175
Page 3 of 5 Description of Proposal Please provide a description of your proposal to which your review relates. The description should be the same as given in the application form, or as amended with the agreement of the planning authority: * (Max 500 characters) Type of Application What type of application did you submit to the planning authority? * Application for planning permission (including householder application but excluding application to work minerals). Application for planning permission in principle. Further application. Application for approval of matters specified in conditions. What does your review relate to? * Refusal Notice. Grant of permission with Conditions imposed. No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal. Statement of reasons for seeking review You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement must set out all matters you consider require to be taken into account in determining your review. If necessary this can be provided as a separate document in the ‘Supporting Documents’ section: * (Max 500 characters) Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce all of the information you want the decision-maker to take into account. You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that time or that it not being raised before that time is a consequence of exceptional circumstances. Have you raised any matters which were not before the appointed officer at the time the Yes No Determination on your application was made? * If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before your application was determined and why you consider it should be considered in your review: * (Max 500 characters) Sub divide site for dwellinghouse and form new vehicle access at Stanes, Cummingston We believe it should be recommended for approval. Appeal supporting statement attached. Page 175
Page 176
Page 4 of 5 Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters) Application Details Please provide the application reference no. given to you by your planning authority for your previous application. What date was the application submitted to the planning authority? * What date was the decision issued by the planning authority? * Review Procedure The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review process require that further information or representations be made to enable them to determine the review. Further information may be required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or inspecting the land which is the subject of the review case. Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other parties only, without any further procedures? For example, written submission, hearing session, site inspection. * Yes No In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion: Can the site be clearly seen from a road or public land? * Yes No Is it possible for the site to be accessed safely and without barriers to entry? * Yes No Checklist – Application for Notice of Review Please complete the following checklist to make sure you have provided all the necessary information in support of your appeal. Failure to submit all this information may result in your appeal being deemed invalid. Have you provided the name and address of the applicant?. * Yes No Have you provided the date and reference number of the application which is the subject of this Yes No review? * If you are the agent, acting on behalf of the applicant, have you provided details of your name Yes No N/A and address and indicated whether any notice or correspondence required in connection with the review should be sent to you or the applicant? * Have you provided a statement setting out your reasons for requiring a review and by what Yes No procedure (or combination of procedures) you wish the review to be conducted? * Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely on and wish the Local Review Body to consider as part of your review. Please attach a copy of all documents, material and evidence which you intend to rely on Yes No (e.g. plans and Drawings) which are now the subject of this review * Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the application reference number, approved plans and decision notice (if any) from the earlier consent. Planning appeal statement 24/00428/PPP 09/07/2024 13/03/2024 Page 176
Page 177
Page 5 of 5 Declare – Notice of Review I/We the applicant/agent certify that this is an application for review on the grounds stated. Declaration Name: Mr Blair Tulloch Declaration Date: 28/08/2024 Page 177
Page 178
Page 178
Page 179
27 August 2024 Plot to East of Stanes Cummingston PLANNING APPEAL STATEMENT (In support of the review of planning decision notice 24/00428/PPP) Page 179
Page 180
Planning Statement (LRB) – Plot to East of Stanes, Cumingston 2 CONTENTS 1. INTRODUCTION Page 3 2. DEVELOPMENT PROPOSAL & POLICY APPRAISAL Page 5 3. REFUSAL NOTICE & DISCUSSION Pages 6-9 4. CONCLUSION Page 10 Author C Bremner Version Issue 1 August 2024 Tulloch of Cummingston Ltd, Tulloch House, Forsyth Street, Hopeman, IV30 5ST Tel: (01343) 835600 Fax: (01343) 835700 Email: office@tullochofcummingston.co.uk Page 180
Page 181
Planning Statement (LRB) – Plot to East of Stanes, Cumingston 3 1. INTRODUCTION The purpose of this Planning Statement is to draw upon the details as already submitted to demonstrate that the proposed plot (planning application reference 24/00428/PPP) should have been approved given its compliance with existing and emerging national planning policies and compliance with the principle aims set out in MLDP and associated material considerations. This Statement is not intended to provide new supporting information but instead to respond to the assessment made in the Officer’s Handling Report and the reasons for refusal as outlined in the Decision Notice, by providing additional policy referencing and evidence. These are provided to counter argue the points in the reasons for refusal and those outlined in the Officer’s Handling Report. Reference to policy and visual aspects during site inspections would have been available and be used by the planning officer in determining this proposal and are not therefore new material. Given the statutory requirement that all applications should be assessed on their own individual merits against planning policy and material planning considerations, this Statement will concentrate on the consideration of whether the proposals meet the policy requirements in principle as set out in national policy and guidance, and then regarding Policy DP1 part f (Development Principles), EP3 part b, NPF 4,14 and 16, as included in the reasons for refusal. Relevant and significant material considerations are also presented throughout the Statement, which must be considered in assessing this application. It is important and specifically requested that the Local Review Body Members read this Statement alongside all the previously submitted Statements and Reports to enable a comprehensive review of all the facts and merits involved in these proposals before making their decision on this case. Page 181
Page 182
Planning Statement (LRB) – Plot to East of Stanes, Cumingston 4 2. DEVELOPMENT PROPOSAL The site is located at Grid reference NJ 13492 69043 (313492E, 869043N), to the East end of Cummingston. Cummingston has a wide variety of house styles and designs along the full length of the village with many of these being the result of sub-division of the original large almost croft like holdings. The proposal as shown on the site plan, under this application, was to sub divide the existing garden area and part of the adjoining lane to the east of the site forming a new plot 442sqm. Plot development will include the replacement of the existing flat roofed double garage with a proposed single-storey house to be positioned at this location. The proposed house outline indicated on the proposal would be of similar frontage to the existing double garage and design of the proposed house would be subject to a full planning application which Moray Council would have control over the house design and character. This application was submitted to provide the option for the current elderly owner of Stanes to downsize into a smaller more energy efficient bungalow with a much more manageable garden area. We felt there would be no loss of amenity to the existing bungalow as there are no windows looking directly onto the proposed plot and there is still a more than sizeable garden area left to the rear and west. The access to the proposed site would be via the existing driveway serving Stanes and a new access with off-street parking is proposed further West to serve the existing house. Both accesses have no visibility issues, and the Transportation manager has raised no objection to the proposals. A Site Investigation and Drainage Assessment was carried out by Mabbett, Appendix 1, and proposed surface water is to discharge to the existing sewer located within the public road via a Rainwater harvesting tank. A public water supply would be laid into the dwelling which Scottish Water had no objection to. 3. REFUSAL NOTICE & DISCUSSION The planning application was determined on 9th July 2024 and was refused planning permission for the reason(s) as follows- The proposal is contrary to the provisions of Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan because: The proposal to create an additional house site in the garden grounds of the existing parent property Stanes would appear incongruous to the existing site layout and fail to reflect and respect the existing character of the site. The proposal would therefore have a detrimental impact on the quality of the built environment at this site and be detrimental to the character and surrounding area which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics for all development. The proposal would therefore be contrary to Policies NPF Policies 14, 16 & 4, and MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan Appendix 2 Contains the decision notice and the planning officers handling of the application. Page 182
Page 183
Planning Statement (LRB) – Plot to East of Stanes, Cumingston 5 1 - DP1/EP3 Policy DP1: Proposals do not result in backland development or plots that are subdivided by more than 50% of the original plot. Sub-divided plots must be a minimum of 400m2, excluding access and the built- up area of the application site will not exceed one-third of the total area of the plot and the resultant plot density and layout reflects the character of the surrounding area. The proposed plot is 442sqm and the built-up area of the plot will be less than a third of the total plot area. The planning officer’s report of handling suggests the existing garage is inconsequential, however there is no denying the current double garage building which has a flat roof and 2 large white doors is very visible in this location. A single-storey house of similar frontage with a slated, hipped roof for example would be more in character with its surroundings than the current garage building. Just two doors along a similar plot subdivision has taken place (03/00491/FUL) which has squeezed a large and imposing 3 level house into an even narrower plot of land (see Appendix 5 attached). Page 183
Page 184
Planning Statement (LRB) – Plot to East of Stanes, Cumingston 6 Tulloch of Cummingston recently also had an application permitted in the village on a similar width plot (22/01299/APP) with 900mm width on one side and 1200mm to the other, so considerably tighter than this proposal (see Appendix 6 attached). 2 – NPF 4,14 and 16 The National Planning Framework NPF 14 states developments are to be: “Sustainable: Supporting the efficient use of resources that will allow people to live, play, work and stay in their area, ensuring climate resilience, and integrating nature positive, biodiversity solutions.” The proposed plot was to allow the applicant to stay in the area by downsizing to a smaller bungalow and garden which is more manageable, otherwise the house will have to be sold and the applicant will have to move away from the area she has stayed in most of her adult life to find a suitable new home. NPF 16 part C ii. States development could include: “accessible, adaptable and wheelchair accessible homes” And Part C vi. “homes for older people” The proposed application would allow for a house to be built to current Building standards which would be accessible and adaptable as standard. 4. CONCLUSION For the reasons given above, we have demonstrated that the proposed development would comply with current planning policies, and we ask that the proposal be considered favourably for approval on appeal. END OF REPORT Appendices: 1. Drainage assessment 2. Decision notice and Report of Handling 3. Site Plan - Refused 4. Email to planning officer – 27-05-2024 5. Rowandale, Cummingston – Plan and photos (03/00491/FUL) 6. Lochiel, Cummingston – Approved planning (22/01299/APP) Page 184
Page 185
Page 185
Page 186
(Page 2 of 3) Ref: 24/00428/PPP IMPORTANT YOUR ATTENTION IS DRAWN TO THE REASONS and NOTES BELOW SCHEDULE OF REASON(S) FOR REFUSAL By this Notice, the Moray Council has REFUSED this proposal. The Councils reason(s) for this decision are as follows: - The proposal is contrary to the provisions of Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan because: The proposal to create an additional house site in the garden grounds of the existing parent property Stanes would appear incongruous to the existing site layout and fail to reflect and respect the existing character of the site. The proposal would therefore have a detrimental impact on the quality of the built environment at this site and be detrimental to the character and surrounding area which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics for all development. The proposal would therefore be contrary to Policies NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) of the Development Plan. LIST OF PLANS AND DRAWINGS SHOWING THE DEVELOPMENT The following plans and drawings form part of the decision:- Reference Version Title STANES/SITE01 Site plan STANES/LOC01 Location plan STANES/VIS01 Visibility splay DETAILS OF ANY VARIATION MADE TO ORIGINAL PROPOSAL, AS AGREED WITH APPLICANT (S.32A of 1997 ACT) Amended site plan submitted showing a reduced house footprint. NOTICE OF APPEAL TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 If the applicant is aggrieved by the decision to refuse permission for or approval required by a condition in respect of the proposed development, or to grant permission or approval subject to conditions, the applicant may require the planning authority to review the case under section 43A of the Town and Country Planning (Scotland) Act 1997 within three months from the date of this notice. The notice of review should be addressed to The Clerk, Moray Council Local Review Body, Legal and Committee Services, Council Offices, High Street, Elgin IV30 1BX. This form is Page 186
Page 187
(Page 3 of 3) Ref: 24/00428/PPP also available and can be submitted online or downloaded from www.eplanning.scot/eplanningClient If permission to develop land is refused or granted subject to conditions and the owner of the land claims that the land has become incapable of reasonably beneficial use in its existing state and cannot be rendered capable of reasonably beneficial use by the carrying out of any development which has been or would be permitted, the owner of the land may serve on the planning authority a purchase notice requiring the purchase of the owner of the land’s interest in the land in accordance with Part 5 of the Town and Country Planning (Scotland) Act 1997. Page 187
Page 188
REPORT OF HANDLING Ref No: 24/00428/PPP Officer: Shona Strachan Proposal Description/ Address Sub divide site for dwellinghouse and form new vehicle access at Stanes Cummingston Elgin Moray Date: 04/07/2024 Typist Initials: DJP RECOMMENDATION Approve, without or with condition(s) listed below N Refuse, subject to reason(s) listed below Y Legal Agreement required e.g. S,75 N Notification to Scottish Ministers/Historic Scotland N Hearing requirements Departure N Pre-determination N CONSULTATIONS Consultee Date Returned Summary of Response Moray Flood Risk Management 26/06/24 No objection subject to a condition which would require a full detailed drainage design with any detailed planning application which should detail the grey water system integration. Planning And Development Obligations 20/03/24 Developer Obligations Assessment identifies obligations towards: Demand Response Transport Healthcare Affordable Housing Contribution is also required. Environmental Health Manager 18/03/24 No objection Contaminated Land 21/03/24 No objection Transportation Manager 26/03/24 No objection subject to conditions for safe access and parking. Scottish Water 28/03/24 No objection subject to their Pre- Development Enquiry Process at the appropriate juncture. Aberdeenshire Council Archaeology Service 26/03/24 No objections DEVELOPMENT PLAN POLICY Policies Dep Any Comments (or refer to Observations below) National Planning Framework 2023 NPF1 - Tackling the Climate N Page 188
Page 189
Page 2 of 6 NPF2 - Climate mitigation and adaptation N NPF3 - Biodiversity N NPF4 - Natural Places Y NPF5 - Soils N NPF12 - Zero waste N NPF13 - Sustainable transport N NPF14 - Design, quality and place Y NPF16 - Quality homes Y NPF18 - Infrastructure first N NPF20 - Blue and green infrastructure N NPF22 - Flood risk N NPF23 - Health and safety N Moray Local Development Plan 2020 PP3 Infrastructure and Services N DP1 Development Principles Y DP2 Housing N EP3 Special Landscape Areas Y EP12 Management and Enhancement Water N EP14 Pollution Contamination Hazards N EP13 Foul Drainage N REPRESENTATIONS Representations Received YES Total number of representations received: ONE Names/Addresses of parties submitting representations Name and address details of parties submitting representations withheld in accordance with the General Data Protection Regulations. Summary and Assessment of main issues raised by representations Issue: This proposal will completely ruin view. Comments (PO): There is no right to a view in planning terms. It is not a material consideration. Issue: Noise of construction will cause a huge burden to our ability to work from home. Comments (PO): Whilst it is acknowledged that building works can cause noise disruption, this is of a timebound nature and measures can be put in place to control hours of works etc. Ultimately construction noise is not a material planning reason to refuse a planning application. Page 189
Page 190
Page 3 of 6 Issue: Carnan has been missed off the plan between Avron Bank and Edoras. Comments (PO): The purpose of the location plan is to identify the application site. The location plan meets the requirements to do this and meets the requirements of the planning application validation. OBSERVATIONS – ASSESSMENT OF PROPOSAL Legislative Framework Section 25 of the 1997 Act as amended requires applications to be determined in accordance with the development plan, namely the adopted National Planning Framework 4 and adopted Moray Local Development Plan 2020 (MLDP 2020) unless material considerations indicate otherwise. The main planning issues are considered below: Proposal This application seeks planning permission in principle to sub divide existing house site for dwellinghouse and form new vehicle access at Stanes Cummingston. As this is an application for planning permission in principle detailed design information has not been provided. The site plan does show an indicative position and footprint for the proposed dwelling and also shows the site access, as well as a new access to be formed for the existing property. During the course of the application an amended site plan was submitted to show a reduced house footprint. This plan is indicative and forms the basis for this assessment. The site plan also shows the position and footprint of the existing garage which is to be removed. The proposed dwelling is shown to be sited over the footprint of the garage. Drainage is to be connected to the existing mains pipes with a rain water harvesting system to be installed on site, this grey water can be used for W/C flushing and garden maintenance. Access will be to the south onto the main B9040 public road, the proposal would entail the installation of a new access for the existing property. Site The property Stanes is a traditionally designed and proportioned single storey dwelling positioned centrally within its plot. Whilst the property is not listed it does have an elegance arising from its traditional design and setting within the plot. As shown on the site plan, under this proposal the existing property would be sub divided to the east of the site and would entail the removal of the existing flat roofed garage with the proposed house to be positioned at this location. Beyond the site boundary to the east is a narrow access lane with the existing neighbouring property beyond, this eastward neighbouring property is a narrow spanned small proportioned cottage. The public road is to the south of the site which is lined with existing properties and the parent to the west. The garden ground of the property extents to the north and includes a change in level. Under the terms of the MLDP 2020 Cummingston falls with the Burghead to Lossiemouth Coast Special Landscape Area. Policy Assessment Siting and Impact of the Development NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b NPF4 Policy 14 requires that development proposals be designed to improve the quality of an area whether in urban or rural locations and regardless of scale. It also states that development proposals will be supported where they are consistent with the six qualities of successful places; Healthy, Page 190
Page 191
Page 4 of 6 Pleasant, Connected, Distinctive, Sustainable and Adaptable. NPF Policy 14 states that proposals which are poorly designed, detrimental to the amenity of the surrounding area or inconsistent with the six qualities of successful places will not be supported. NPF Policy 16 is supportive of quality homes for proposals which are for small scale opportunities within existing settlement boundaries. Policy DP1, part f) sets out specific requirements for sub divide garden plots. Specifying that: proposals do not result in backland development or plots that are subdivided by more than 50% of the original plot. Sub-divided plots must be a minimum of 400m2, excluding access and the built-up area of the application site will not exceed one-third of the total area of the plot and advises that the resultant plot density and layout reflects the character of the surrounding area. Policies NPF4 and MLDP (EP3) Policy EP3 seek to preserve special landscape areas, specifically Policy EP3 part b) applies to urban areas and requires proposal to meet the relevant terms of Policy DP1 and to reflect the traditional settlement character in terms of siting and design. The existing property Stanes is a traditionally designed and proportioned single storey dwelling positioned centrally within its plot. Whilst the property is not listed it does have an elegant pleasantness arising from its traditional design and its position centrally within the plot. The proposal to remove an existing inconsequential ancillary garage and sub divide the garden ground to create an additional house site in the grounds of the existing dwelling would appear cramped and incongruous to the existing layout and fail to reflect and respect the existing character of the site. The proposal would therefore be detrimental to the character of the site and its surrounds which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics for all development. As a result, the existing garden ground of the property Stanes is not considered to be a suitable sub divide house plot. The proposal therefore fails to comply with NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b) Design and Amenity Considerations NPF Policies 14, 16 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b As detailed above, whilst it is considered that the proposal would undermine the existing high quality character of the site, it is recommended that should the application go on to be approved that any house design should be of restricted height and limited footprint with traditional materials and finish. This is to help ensure an acceptable design and appearance and limit amenity impacts in relation to any over bearing impacts from a dwelling being sited in an existing garden. However, these matters are considered separate from and does not override the policy objection to the proposal based on the inappropriate siting of the proposal. Water and Drainage NPF 20 & 22 / MLDP 12 & 13 Scottish Water has confirmed no objection to the proposal and any connections required for drinking and foul connection would be the subject of separate liaison between the applicant and Scottish Water at the appropriate juncture should the application go on to be approved. The application has been supported by a drainage assessment which has been accepted by Moray Flood Risk Management the surface water drainage proposal is considered acceptable for planning permission in principle and further details would be sought as part of any future detailed application. Compliance with Drainage requirements is separate from and does not override the policy objection to this proposal based on its inappropriate siting. Access and Parking NPF 13 / MLDP DP1 The Transportation Manager has raised no objection to the proposal subject to conditions for safe secure access for the existing and proposed dwelling. The Transportation Manager, is satisfied that Page 191
Page 192
Page 5 of 6 these can be achieved. However, this is separate from the policy objection to the proposal based on its unacceptable siting. Developer Obligations and Affordable Housing NPF 18 / MLDP PP3 & DP1 The Assessment identifies that Developer Obligations towards demand responsive transport and healthcare is required. An affordable housing contribution is also required. The applicant has confirmed willingness to accept the obligations and the contribution, these aspects would be secured by a Section 75 Agreement should the application go on to be approved. The proposal would therefore acceptable under the requisite requirements of policies. However, this is separate from the policy objection to the proposal based on its unacceptable siting. Climate Change, Soils and Biodiversity NPF 1, 2, 3 & 5 The proposal seeks to further develop an already developed house site within an existing settlement boundary. Therefore the proposal is not considered to be significantly detrimental to the global nature and climate crisis. Specific requirements for biodiversity enhancement could be requested as part of any detailed design proposals. However, these matters are separate from and do not override the unacceptable siting of the development. Conclusion and Recommendation In this instance, the proposal has failed to comply with the terms of Policies NPF Policies 14 & 4, and, MLDP Policies DP1, part f & Policy EP3 part b). The proposal for the subdivision of garden ground to create an additional dwelling would fail to reflect and respect the character of the site and therefore would be detrimental to the character of the site and the surrounding area which is part of the Burghead to Lossiemouth Coast Special Landscape Area which requires high quality siting characteristics to be achieved. OTHER MATERIAL CONSIDERATIONS TAKEN INTO ACCOUNT N/A HISTORY Reference No. Description Take down and replace existing timber conservatory with new UPVC conservatory at Stanes Cummingston Burghead Elgin Moray 07/01152/FUL Decision Permitted Date Of Decision 03/07/07 ADVERT Advert Fee paid? N/A Local Newspaper Reason for Advert Date of expiry DEVELOPER CONTRIBUTIONS (PGU) Status CONT SOUGHT Page 192
Page 193
Page 6 of 6 DOCUMENTS, ASSESSMENTS etc. * * Includes Environmental Statement, Appropriate Assessment, Design Statement, Design and Access Statement, RIA, TA, NIA, FRA etc Supporting information submitted with application? YES Summary of main issues raised in each statement/assessment/report Document Name: Drainage Assessment Main Issues: Provides detail of proposed drainage design which will include a grey water system. . S.75 AGREEMENT Application subject to S.75 Agreement NO Summary of terms of agreement: Location where terms or summary of terms can be inspected: DIRECTION(S) MADE BY SCOTTISH MINISTERS (under DMR2008 Regs) Section 30 Relating to EIA NO Section 31 Requiring planning authority to provide information and restrict grant of planning permission NO Section 32 Requiring planning authority to consider the imposition of planning conditions NO Summary of Direction(s) Page 193
Page 194
Page 194
Page 195
1 Christopher From: John Tulloch Sent: 27 May 2024 17:56 To: Shona Strachan Cc: Christopher Subject: FW: 24/00428/PPP: Stanes Cummingston Attachments: Rowandale.pdf; 20240524_092642.jpg; 20240524_164149.jpg; Moray Council - floor plans.pdf; Pluscarden Road, Elgin.PNG; 2201299APP-Site plan.pdf; Stanes - Site Plan A3 - revA.pdf Hi Shona, Chris has forwarded on your email regarding the above application. I have spoken to the clients (the owners son and daughter) who are obviously not happy with this and minded to carry on and have the application determined and submit an appeal to the LRB if the decision is a refusal. It may not be relevant from a planning perspective but the application was submitted to provide the option for the current owner of the house who is in her nineties to downsize into a smaller more energy e$icient bungalow with a much more manageable garden area. We felt there would be no loss of amenity to the existing bungalow as there are no windows looking directly onto the new plot and there is still a more than sizeable garden area left to the rear and west facing side. There would actually have been the potential of forming a plot to the western side as well within the remaining garden area and still comply with the plot subdivision areas of 400m2 to each but the intention was not to over develop or maximise its potential but to provide the sole option of downsizing to a smaller home. The clients have pointed out that just two doors along a similar plot subdivision has taken place which has squeezed a new 3 level house into an even narrower plot of land (see Rowandale site plan attached with front and rear photos) and they feel this has set a precedent and in the interests of consistency can’t understand why their proposal should be treated any di$erently. We did actually carry out another similar plot division a few years back at 70 Pluscarden Road in Elgin (see attached details again), this also had an existing centrally positioned house with the new plot formed to the side, again with an even narrower plot frontage, this plot had outline consent when the owners purchased it and we had to try and design in a bungalow to suit which was admittingly a bit of a challenge! Last year we also had an application permitted in the village on a similar width plot (2201299APP) and this house had barely 900mm width on one side and 1200mm to the other so considerably tighter than our current proposals. Our existing application shows a proposed footprint area that is actually much larger than what would be required for Mrs Noble’s requirements so I have asked Chris to prepare a new site plan (attached) showing what would be a fairly standard sized 2 bedroom bungalow on it to be more representative of what would actually be formed on site should this proceed through outline planning. We have also positioned it further away from the exiting house whilst still leaving part of the lane for access purposes and a reasonable space to the side of the proposed new bungalow and increased 2m width to the side of the existing home, this will leave the proposed single storey house over 6m away from the existing bungalow so this should not in any way be deemed “cramped” especially in relation to the other properties highlighted above. Hopefully what we have shown will be more acceptable and given the above comments be considered fairly given the circumstances and changes made, I will ask Chris to upload the new site plan to the planning portal, will this have to be readvertised again? Page 195
Page 196
2 Please let me know your thoughts, Regards John John Tulloch Managing Director Tulloch of Cummingston Ltd A: Tulloch House, Forsyth St, Hopeman. IV30 5ST E: www.tullochofcummingston.co.uk T: 01343 835600 M: 07917 080500 From: Christopher <christopher@tullochofcummingston.co.uk> Sent: Thursday, May 23, 2024 2:30 PM To: John Tulloch <john@tullochofcummingston.co.uk> Subject: FW: 24/00428/PPP: Stanes Cummingston From: Shona Strachan <Shona.Strachan@moray.gov.uk> Sent: Thursday, May 23, 2024 2:17 PM To: Christopher <christopher@tullochofcummingston.co.uk> Subject: 24/00428/PPP: Stanes Cummingston Hi Chris, Having considered the proposal in detail and following discussion with the DM Manager, I can advised that should this case proceed to determination it will be refused as being determinantal to the character of the site. Given the presence of the existing traditional single storey property located centrally in the plot any development proposals to be sited on what is ancillary grounds to the existing property will appear cramped and incongruous to the existing layout. Please can you advise if you/your client would wish the application to proceed to determination to a$ord the opportunity for a review of the case by the LRB? Many thanks, Shona Strachan| Development Management, Planning Officer | Economic Growth and Development shona.strachan@moray.gov.uk | website | facebook | twitter | newsdesk 01343 563303 Page 196
Page 197
3Page 197
Page 198
Rowandale – OS map Page 198
Page 199
Rowandale – Front Elevaon Rowandale – Rear Elevation Page 199
Page 200
Page 200
Page 201
Mabbett & Associates Ltd, Corporate and Registered Office: 13 Henderson Road, Inverness, UK, IV1 1SN Registered in Scotland No: SC 163378 info@mabbett.eu www.mabbett.eu Belfast | Cardiff | Dublin | Dundee | Edinburgh | Glasgow | Inverness | Leicester | Liverpool © 2024, Mabbett & Associates Ltd. All Rights Reserved. The name Mabbett and the Mabbett logo are Trade Marks licensed to Mabbett & Associates Ltd. 29 April 2024 Project No: 315097 Drainage Assessment: Proposed Dwelling within land adjacent to Stanes, Main Street, Cummingston IV30 5XY Prepared for: C/O Christopher Bremner Tulloch of Cummingston Tulloch House Forsyth Street Hopeman IV30 8ST Contents Amendment Record This report has been issued and amended as follows: Revision Description Date Signed 1.0 First Issue 29 April 2024 G Mackintosh Page 201
Page 202
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page i Acknowledgement This report has been prepared for the sole and exclusive use of Tulloch of Cummingston in accordance with the scope of work presented by Mabbett & Associates Ltd (Mabbett) via email dated 28th March 2024. This report is based on information and data collected by Mabbett. Should any of the information be incorrect, incomplete or subject to change, Mabbett may wish to revise the report accordingly. This report has been prepared by the following Mabbett personnel: MABBETT & ASSOCIATES LTD Gary Mackintosh, BSc Principal Engineer This report has been reviewed and approved by the following Mabbett personnel: MABBETT & ASSOCIATES LTD David Clark, BSc (Hons) Project Manager and Environmental Consultant Page 202
Page 203
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page ii Table of Contents Section 1.0 Introduction 1 1.1 Introduction to Surface Water Treatment 1 Section 2.0 Site Profile and Ground Assessment 3 2.1 Existing Site 3 2.2 Existing Ground Conditions 3 2.3 Location of Services 3 2.4 Other Implications of Plot Size or Vegetation 3 2.5 Infiltration Testing 4 Section 3.0 Surface Water 5 3.1 Minimum System Requirements 5 3.2 Recommendation - Surface Water 5 Section 4.0 Disclaimer 5 Section 5.0 References 7 Appendix 1: Test Hole/Discharge Location 10 Appendix 2: Storage Calculations 11 Appendix 3: Rain Garden Construction Details 10 Page 203
Page 204
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 1 of 8 Section 1.0 Introduction Mabbett & Associates Ltd (Mabbett) was commissioned by Tulloch of Cummingston to undertake an assessment of the surface water treatment and management options for proposed new dwelling to be formed in land adjacent to exiting property, Stanes, Main Street, Cummingston. 1.1 Introduction to Surface Water Treatment With regard to surface water treatment and dispersal, Regulation 3.6 of the Building (Scotland) Regulations 2004, as reproduced below, states that: Every building and hard surface within the curtilage of a building, must be designed and constructed with a surface water drainage system that will: (a) ensure the disposal of surface water without threatening the building and the health and safety of the people in and around the building; and (b) have facilities for the separation and removal of silt, grit and pollutants. Section 3.6.3 of the Technical Handbook provides methods of discharging surface water that, if employed, would meet the requirements of the authorities. With regard to SEPA’s requirements, General Binding Rule (GBR) 10, in pursuance of the Water Environment (Controlled Activities) (Scotland) Regulations 2011, states that the provision of a sustainable urban drainage system (SUDS) is required unless the discharge arises from a single house or if the discharge is to be made to coastal waters. GBR10 and the relevant associated rule is outlined overleaf. Page 204
Page 205
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 2 of 8 GBR10: a) Discharge of surface water run-off from a surface water drainage system to the water environment from: i. Up to 60 hectares of land used for residential premises; ii. Land used for non-residential premises or yards, except where the buildings or yards are in an industrial estate; iii. Land used as a motorised vehicle parking area with up to 1,000 parking spaces; iv. Metalled roads other than motorways and A roads; v. Waterbound roads; or b) Discharge of water run-off from a construction site to the water environment where the site, including any constructed access tracks does not: i. Exceed 4 hectares; ii. Contain a road or track length in excess of 5 km; or iii. Including any area of more than 1 hectare or any length of more than 500 metres on ground with a slope in excess of 25º. Rules: d) the discharge must not contain any water run-off from any built developments, the construction of which is completed on or after 01 April 2007, or from construction sites operated on or after 01 April 2007, unless: i. during construction those developments are drained by a SUD system or equivalent systems equipped to avoid pollution of the water environment; ii. following construction those developments are drained by a SUD system equipped to avoid pollution of the water environment; iii. the run-off is from a development that is a single dwelling and its curtilage; or iv. the discharge is to coastal water. (Source; SEPA: The Water Environment (Controlled Activities) (Scotland) Regulations 2011 - A Practical Guide) Version 9.2, December 2022. Page 205
Page 206
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 3 of 8 Section 2.0 Site Profile and Ground Assessment 2.1 Existing Site Stanes is located to the north of Main Street, Cummingston at or about NGR NJ 13496 69033 The SEPA Flood Map identifies the site and surrounding area as having no specific risk from fluvial or pluvial flooding during a 1:200year event. 2.2 Existing Ground Conditions Trial pits were carried out by Mabbett on 10th April 2024 to assess the suitability of the existing soils for the use of infiltration as a method of surface water management. The trial pits were excavated to a depth of 1.5m which confirmed ground conditions of brown, firm to stiff, slightly sandy, silty, Clays proved to the depth of the excavations. There was no evidence of contamination of water table present during the excavations. 2.3 Location of Services There are no known services located within the site boundary. 2.4 Other Implications of Plot Size or Vegetation Any infiltration device for sewage or wastewater must be located: at least 50m from any spring, well or borehole used as a drinking water supply, and at least 10m horizontally from any watercourse (including any inland or coastal waters), permeable drain, road or railway. Any infiltration system and any treatment plant must also be located: at least 5m from a building, and at least 5m from a boundary. The location of any septic tank or treatment plant must ensure that a desludging tanker can gain access to a working area that: will provide a clear route for a suction hose from the tanker to the tank, is not more than 25 m from the tank where it is not more than 4m higher than the invert level of the tank, and is sufficient to support a vehicle axle load of 14 tonnes. There should be no notable vegetation that might interfere with any system proposed or vice versa. Page 206
Page 207
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 4 of 8 2.5 Infiltration Testing Infiltration testing carried out to BRE 365 Digest for the purpose of evaluating the length and position of a traditional soakaway was undertaken by Mabbett during the site visit. Weather conditions during the visit were dry/overcast. The conditions were not considered abnormal for the time of year. The testing proved unsuccessful as a result of the clay-based soils, it was concluded the site was not conducive to the installation of any form of disposal system based on infiltration. As a result of these findings, an alternative solution based on achieving a discharge of appropriately attenuated and treated surface water to a watercourse is required to be investigated. Page 207
Page 208
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 5 of 8 Section 3.0 Surface Water 3.1 Minimum System Requirements In pursuit of compliance with Regulation 3.6 of the Building (Scotland) Regulations 2004, Section 3.6.3 of the Technical Handbook provides methods of discharging surface water that, if employed, would meet the requirements: (a) a SUD system designed and constructed in accordance with clause 3.6.4; (b) a soakaway constructed in accordance with: clause 3.6.5; the guidance in BRE Digest 365, ‘Soakaway Design’, or National Annex NG 2 of BS EN 752-4: 1998; (c) A public sewer provided under the Sewerage (Scotland) Act 1968; (d) An outfall to a watercourse, such as a river, stream or loch or coastal waters, that complies with any notice and/or consent by SEPA, or (e) If the surface water is from a dwelling, to a storage container with an overflow discharging to either of the 4 options above. The area to be drained consists of the roof of the dwelling and associated hardstandings. 3.2 Recommendation - Surface Water It is proposed that the surface water makes discharges to the existing sewer located within the public road. There are sewers located within main street to the south of the site and within Seaview Road to the north. The final connection location will be determined by Topography and Scottish Water Preference. Scottish Water Policy requires that there is to be no increase in flow to the existing system up to and including a 1:30 year event. In line with good practice and CIRIA/Local Authority policy it is proposed to intall Rainwater Harvesting as a sustainable method of surface water management for the proposed new roof area. The rainwater harvesting tank is to be used for general garden maintenance, car washing and grey water use within the property (w/c flushing for example). The tank will require an overflow to be attenuated my means of and orifice plate which will discharge to the public sewer. Standard rainwater harvesting sizing based on manufacturers recommendations can be shown as: Cleaning use based on 2.5m3 per person per annum = 7,500Litres Garden water use is estimated as 150Litres/m2 per annum in the UK. Garden size of 150m2 (estimated based on size of proposed plot) = 22,500Litres A buffer storage of 20 Days has been applied. Tank Size is calculated as Deman * Buffer/365 = 1,643Litres To comply with Scottish Water policy, the tank will also require to manage surface water flows up to and including a 1:30year event. Based on a discharge rate of 0.5l/s and a proposed roof area of 150m2 (allowing for extra over), the storage volume required for a 1:30year event with 42% allowance for climate change is 1.89m3. The nearest available standard tank size of 3000litres would be suitable for installation. The final tank design will be a bespoke design carried out by the chosen manufactures to meet the requirements outlined within this report. The current application is for Planning Permission in Principal and therefore the sizing within this report would require to be reviewed following the final house design. Page 208
Page 209
Land Adjacent to Stanes, Main Street, Cummingston 315097 © 2024, Mabbett & Associates Ltd Page 6 of 8 Section 4.0 Disclaimer The content of this assessment is for internal use only and should not be distributed to third parties unless under the expressed authority of our client. The designs, recommendations and outline proposals shall remain the property of Mabbett & Associates Ltd and shall not be plagiarised in any form without authority to do so. The comments and recommendations stipulated are solely those expressed by Mabbett & Associates Ltd, and both parties understand that the comments and recommendations expressed are not binding. Mabbett & Associates Ltd confirms that reasonable skill, care, and diligence have been applied and that any design element has been carried out using verifiable and approved reference documentation. No responsibility shall be assumed by Mabbett & Associates Ltd for system failure as a result of incorrect installation work by contractors assigned by the client or incorrect or inappropriate implementation of Mabbett & Associates Ltd’s recommendations. Page 209
Page 210
© 2024, Mabbett & Associates Ltd Section 5.0 References Building (Scotland) Regulations 2004 The Scottish Building Standards: Technical Handbook 2019: Domestic British Standard BS6297:2007 Code of Good Practice for the Design and Installation of Drainage Fields for use in Wastewater Treatment British Water Code of Practice: Flows and Loads 4 - Sizing Criteria, Treatment Capacity for Sewage Wastewater Treatment Systems, 2013 The Water Environment (Controlled Activities) (Scotland) Regulations 2011 SEPA: The Water Environment (Controlled Activities) (Scotland) Regulations 2011 - A Practical Guide) Version 9.2, December 2022. SEPA: Regulatory Method WAT-RM-03: Regulation of Sewage Discharges to Surface Water. SEPA: Regulatory Method WAT-RM-04 Regulation of Indirect Sewage Discharges to Groundwater Environment Act 1995 Page 210
Page 211
© 2024, Mabbett & Associates Ltd Appendix 1 Appendix 1: Test Hole/Location Page 211
Page 212
DO NOT SCALE FROM THIS DRAW ING, IF IN DOUBT PLEASE ASK. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT. THIS DRAW ING IS THE COPYRIGHT OF MABBETT & ASSOCIATES LTD Client Project Drawing No: Scale Drawing Rev Drawn Status Sheet Check Date W illow House Stoneyfield Business Park Inverness IV2 7PA Tel: 01463 237229 www.mabbett.eu Description Date Rev. Drawn DC 29.4.24 PL01 X 315097 A3 GMNTS Issue Test Hole Location Cummingston Site Adj to Stanes Proposed Dwelling Tulloch of Cummingston - - - - TH01 Page 212
Page 213
© 2024, Mabbett & Associates Ltd Appendix 2 Appendix 2: Storage Calculations Page 213
Page 214
MabbeƩ & Associates Ltd Unit 2 Horizon Scotland Forres Unterprise Park IV36 2AB File: Network: Storm Network Gary Mackintosh 29.04.24 Page 1 Site Adj to Stanes Main Street Cummingston Flow+ v10.6.234 Copyright © 1988-2024 Causeway Technologies Ltd Design Seƫngs Rainfall Methodology Return Period (years) AddiƟonal Flow (%) FSR Region M5-60 (mm) RaƟo-R CV Time of Entry (mins) FSR 30 0 Scotland and Ireland 14.000 0.300 0.750 5.00 Maximum Time of ConcentraƟon (mins) Maximum Rainfall (mm/hr) Minimum Velocity (m/s) ConnecƟon Type Minimum Backdrop Height (m) Preferred Cover Depth (m) Include Intermediate Ground Enforce best pracƟce design rules 30.00 50.0 1.00 Level Soĸts 0.200 1.200 ✓ ✓ Nodes Name Area (ha) T of E (mins) Cover Level (m) Depth (m) Storage 0.015 5.00 100.000 2.000 SimulaƟon Seƫngs Rainfall Methodology FSR Region M5-60 (mm) RaƟo-R Summer CV Winter CV FSR Scotland and Ireland 14.000 0.300 0.750 0.840 Analysis Speed Skip Steady State Drain Down Time (mins) AddiƟonal Storage (m³/ha) Check Discharge Rate(s) Check Discharge Volume Normal x 240 20.0 x x Storm DuraƟons 15 30 60 120 180 240 360 480 600 720 960 1440 Return Period (years) Climate Change (CC %) AddiƟonal Area (A %) AddiƟonal Flow (Q %) 30 42 0 0 Node Storage Online Hydro-Brake® Control Flap Valve Replaces Downstream Link Invert Level (m) Design Depth (m) Design Flow (l/s) x ✓ 97.500 1.000 0.5 ObjecƟve Sump Available Product Number Min Outlet Diameter (m) Min Node Diameter (mm) (HE) Minimise upstream storage ✓ CTL-SHE-0032-5000-1000-5000 0.075 1200 Node Storage Depth/Area Storage Structure Base Inf Coeĸcient (m/hr) Side Inf Coeĸcient (m/hr) 0.00000 0.00000 Safety Factor Porosity 2.0 1.00 Invert Level (m) Time to half empty (mins) 98.000 21 Depth (m) Area (m²) Inf Area (m²) Depth (m) Area (m²) Inf Area (m²) Depth (m) Area (m²) Inf Area (m²) 0.000 3.0 0.0 1.000 3.0 0.0 1.001 0.0 0.0 Page 214
Page 215
MabbeƩ & Associates Ltd Unit 2 Horizon Scotland Forres Unterprise Park IV36 2AB File: Network: Storm Network Gary Mackintosh 29.04.24 Page 2 Site Adj to Stanes Main Street Cummingston Flow+ v10.6.234 Copyright © 1988-2024 Causeway Technologies Ltd Results for 30 year +42% CC CriƟcal Storm DuraƟon. Lowest mass balance: 100.00% Node Event US Node Peak (mins) Level (m) Depth (m) InŇow (l/s) Node Vol (m³) Flood (m³) Status Link Event (Upstream Depth) US Node Link Ouƞlow (l/s) Discharge Vol (m³) 60 minute winter Storage 50 98.602 0.602 2.6 1.8964 0.0000 OK 60 minute winter Storage Hydro-Brake® 0.5 3.8 Page 215
Page 216
Page 216