Housing and Community Safety Committee 
Tuesday, 15 November 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Housing and Community Safety
Committee is to be held at Council Chambers, Council Office, High Street, Elgin,
IV30 1BX on Tuesday, 15 November 2022 at 14:00. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 12 and 13 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minute of Meeting of the Housing and Community Safety
Committee on 6 September 2022
5 - 12
5. Written Questions ** 
6. Performance Report (Housing and Property Services)
Period to September 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)
13 - 20
7. Housing and Property Budget Monitoring to 30
September 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)
21 - 30
Page 1

Page 2

8. Housing Investment 2022-23 to 30 September 2022
Report by Depute Chief Executive (Economy, Environment and
Finance)
31 - 48
9. Scottish Social Housing Charter Compliance
Report by Depute Chief Executive (Economy, Environment and
Finance)
49 - 70
10. Strategic Housing Investment Plan (SHIP) 2023-24 -
2027-28
Report by Depute Chief Executive (Economy, Environment and
Finance)
71 - 76
11. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
12. Building Services Trading Operation Budget 2022-23 -
Budget Monitoring [Para 9]
• Information on terms proposed or to be proposed by or to the
Authority; 
13. Housing Needs Section Service Development [Para 1
and 2]
• Information relating to staffing matters;
• Information relating to any particular occupier or former occupier of,
or applicant for, accommodation provided by or at the expense of
the Authority; 
Summary of the Housing and Community Safety
Committee functions:
To deal with matters relating to Housing/HMOs, Housing Regeneration,
Homelessness, Social Inclusion, Equalities, Community Safety, Anti-
Social Behaviour (including road accidents) and Community Liaison.     
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 3

Page 4

THE MORAY COUNCIL 
Housing and Community Safety Committee 
SEDERUNT 
Councillor Amber Dunbar  (Chair)
Councillor Donald Gatt  (Depute Chair)  
Councillor Theresa Coull  (Member)
Councillor John Divers  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Marc Macrae  (Member)
Councillor Shona Morrison  (Member)
Councillor Bridget Mustard  (Member)
Councillor Kathleen Robertson  (Member)
Councillor Derek Ross  (Member)
Councillor Draeyk Van Der Horn  (Member)  
Ms Anna Bamforth  (Non-Voting Member)
Ms Jane Bartecki  (Non-Voting Member)
Mr Ronald Tolmie  (Non-Voting Member)
Clerk Name: Lindsey Robinson
Clerk Telephone: 07966 120593
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Housing and Community Safety Committee 
Tuesday, 06 September 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Theresa Coull, Councillor John Divers, Councillor Amber Dunbar,
Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Marc Macrae, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor Draeyk Van Der Horn 
APOLOGIES 
Ms Anna Bamforth, Ms Jane Bartecki, Mr Ronald Tolmie 
IN ATTENDANCE 
Also in attendance at the above meeting were the Depute Chief Executive
(Economy, Environment and Finance), Head of Housing and Property Services,
Acting Housing Strategy and Development Manager, Building Services Manager,
Housing Services Manager, Housing Needs Manager, Property Asset Manager,
Georgina Anderson, Senior Solicitor, and Lindsey Robinson, Committee Services
Officer, as Clerk to the Committee. 
1.         Chair 
Councillor Amber Dunbar, as Chair of the Housing and Community Safety
Committee, chaired the meeting. 
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior decisions
taken on how Members will vote on any item on the agenda or any declarations of
Member’s interests in respect of any item on the agenda. 
3.         Resolution 
The Committee resolved that under Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 12 and 13 of business on
the grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act. 
Paragraph
Number of
Minute
Paragraph Number of Schedule 7a and Reason
12 9 - Information on terms proposed or to be proposed by or to
the Authority.
Item 4.
Page 5

Page 6

13
1 - Information relating to staffing matters.
2 - Information relating to any particular occupier or former
occupier of, or applicant for, accommodation provided by or at
the expense of the Authority. 
4.         Minute of Meeting of the Housing and Community Safety Committee on
21 June 2022 
The minute of the meeting of the Housing and Community Safety Committee dated
21 June 2022 was submitted and approved subject to a review of the notes of the
meeting being undertaken in regard to why the discussion on moss on properties
specificially in New Elgin between Councillor Divers and Officers did not appear on
the minute and the outcome advised accordingly 
Under reference to paragraph 6 of the Minute Councillor Dunbar stated that at the
previous Committee on 21 June 2022, Councillor Keith had raised a question on the
policy in regards to spending the Housing Revenue Account (HRA) surplus and the
plans on how this would be spent and what were the plans of the administration. 
She stated that in terms of the methodology for setting the HRA balance, while a
number of factors have historically informed the level of balance budgeted for, there
has not been a defined policy.  Officers are now working on a policy which is aligned
with the General Services approach, taking into account of particular risks and other
risk factors when determining the budget. 
She further stated that there was a significant backlog in maintenance due to the
pandemic as well as the need to improve the housing stock, the
Administration would be keen to see any available funding in the budget used to
ensure this overdue work is carried out. 
She continued that the Administration was keen on collaboration and that strategic
direction ultimately would be decided by all members of the Committee and by
others if necessary.  She asked that, if any Councillors had any specific ideas on
this point or anything else relevant to the Committee, they should raise them with
her directly and they can be explored further.  
5.         Written Questions ** 
The Committee noted the following written question submitted by Councillor Keith
and the Council’s response thereto: 
What consideration has been given to introducing a Furniture Rental style scheme
for tenants of socially rented accommodation in Moray similar to those scheme
operating in Aberdeen and Newcastle? 
RESPONSE 
We do not currently have a furniture leasing scheme. The Council did have a
scheme in 2005 which was established as a means of matching surplus furniture
which had been purchased (and no longer required) following local flooding
incidents in the area and those who may benefit from receiving it. This scheme was
resource limited and therefore ended when the furniture ran out. 
Page 6

Page 7

Currently at time of allocation, our Housing Support Team will guide clients through
the process of applying for Community Care Grants from the Scottish Welfare Fund.
This has become an established and successful way of ensuring that homeless
applicants are moving into properties with furniture, where they do not have the
means to independently fund it. Our current tenancy sustainment rates for homeless
applicants are in the top quartile nationally, which indicates that tenants are
generally being housed in appropriate accommodation with the resources and skills
they require to maintain the tenancy. 
This is however an area we are not complacent about and we will engage with
applicants and monitor trends of households struggling to acquire furniture at the
moving in stage, to inform whether operation of a Furniture Leasing Scheme may be
of assistance.  
There were no supplementary questions asked by Councillor Keith. 
The Committee noted the following written question submitted by Councillor Mustard
and the Council’s response thereto:  
Recently I had a neurodivergent constituent contact me about the Transport
Scotland Survey on the A96 which they found difficult to complete because of the
wording within some of the questions. They felt some of the questions were vague,
i.e. without definitions or making assumptions about the interpretation of the
questions, and therefore found it difficult to respond. The work I have been involved
in shows that when issues arise which prevents the person from understanding the
question, they do not continue to complete the survey and therefore their potential
input is lost. Taking lessons from this constituent’s concerns and looking at some of
the phraseology within the questions within the housing needs assessment, some
questions may create difficulties for some people. 
For instance, neurodivergent people may struggle with questions which ask ‘could
you’ and then ask for details such as the income questions. The phrase ‘could you’
implies a yes/no answer, as in ‘yes, I could provide you with details’. Instead,
something more direct as such “Please provide” may be better. 
This type of vague language also does not assist people whose first language is not
English, such as British Sign Language (BSL) users. From the training provided to
members by the British Deaf Association, written surveys pose difficulties for BSL
users, and they would recommend an alternative format such as access to signed
questions.  
Additionally, the Scottish Government are consulting on a draft plan to improve and
strengthen Scotland’s equality evidence base. The consultation runs until 21
September 2022. As part of the strategy, new guidance on sex, gender identity and
trans status was published by the Chief Statistician in September 2021. Therefore,
the housing needs assessment should follow that guidance  
These are just a few examples of what may be problematic to some people within
our community whose voices are important, and their input is valuable to gain an
accurate picture of the housing need in Moray. 
What consideration was given to equalities in the phrasing of the questions and
what mitigating action is in place to assist people to complete the survey? 
RESPONSE
Page 7

Page 8

Firstly in terms of methodology, the Housing Need and Demand Assessment survey
is being undertaken using a hybrid research methodology, incorporating both
telephone and online survey methods.  
For the telephone methodology, it is one which allows the consultant Research
Resource to readily support residents to ‘talk through’ the interview meaning that
any who have difficulty in reading or understanding can be supported through the
process. It also allows them to identify any other particular needs when they are
speaking to respondents and do what they can to provide for these. If any
respondents have hearing difficulties they can utilise TypeTalk technology if
required. Moreover, those individuals selected for the survey have been notified by
letter and on that letter there is a telephone number and email address for Research
Resource where they can get in touch to make arrangements for interview. These
arrangements may include appointments at particular dates, times or in a particular
way. They can, and are happy to, liaise with support workers, interpreters and family
members to facilitate inclusion in the research process.  
The consultant has augmented this with an online methodology in order to broaden
access and participation in the survey. The online methodology allows respondents
to use text readers, increase font size, use online translation facilities or change
background colours in order to make the screen more accessible when completing.
The survey is also developed as a multi-mode online survey and is screen adaptive
meaning that respondents can take part on PC, tablet or mobile phone and the
survey will adapt, which has been found to help response and inclusion.  
In terms of questionnaire design, the consultant has been very mindful of inclusion,
but happy to respond to feedback. A large number of the survey questions used are
tried and tested and have been successfully used in other similar surveys. They are
Market Research Society Company Partners and follow their guidelines with respect
to questionnaire design. This means asking questions in a clear and unbiased way,
to ask questions that are within the frame of reference of the respondent and can be
easily responded to and delivering these in an accessible structure.  
As a supplementary question, Councillor Mustard sought clarification on how people
access help if they need it.  
In response, the Head of Housing and Property Services advised that guidance
would be added to the web pages. 
6.         Housing and Property Budget Monitoring to 30 June 2022 
A report by the Depute Chief Executive (Economy, Environment and Finance)
presented the Committee with the budget position for the Housing Revenue Account
and General Services Other Housing Budget for the period to 30 June 2022. 
Following consideration, the Committee agreed to note the budget monitoring report
for the period to 30 June 2022. 
7.         Housing Investment 2022-23 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of the progress of the Housing Investment Programme
2022/23 to 30 June 2022. 
Page 8

Page 9

Following consideration, where Officers answered questions relating to moss
removal, electrical testing and the forced entry to properties, the Committee agreed
to: 
i. note the progress of the Housing investment Programme to 30 June 2022, as
detailed in Section 3 and appendices I to VI of the report; and 
ii. approve the service developments outlined in paragraph 3.10 of the report. 
8.         Rapid Rehousing Transition Plan 
A report by the Depute Chief Executive informed the Committee of progress on
development on Moray's revised Rapid Rehousing Transition Plan and sought
approval for a service development in line with the priorities. 
Councillor Coull in referring to Appendix 1 of the report and in particular to those
households were a lack of life skills featured highly, sought clarification on whether
Education could help with improving the life skills of young people. 
In response, the Housing Needs Manager advised that housing staff used to attend
the secondary schools twice a year, but this was suspended due to the pandemic,
but that he could look at the possibility of restarting this . 
Councillor Robertson stated that she wished to commend the staff for their hard
work in the significant reduction in temporary accommodation. 
Following further discussion Councillor Morrison sought clarification on what support
was available to council tenants during the current cost of living crisis. 
In response, the Head of Housing and Property Services agreed to arrange a
briefing for Members on the approach being taken to support tenants through the
current financial crisis; . 
Thereafter, the Committee agreed: 
i. to note the most recent iteration of the Rapid Rehousing Transition Plan in
appendix 1 of the report, which was submitted to the Scottish Government on 3
August 2022; 
ii. the service development of £46K per annum detailed in paragraph 4.1 of the
report; 
iii. that the Housing Needs Manager investigate with Education reinstating housing
staff visits to secondary schools which were suspended due to the pandemic; 
iv. that the Head of Housing and Property Services arranges for a briefing for
Members on the approach  being taken to support tenants through the current
financial crisis; and 
v. to commend staff for the work undertaken in regard to the significant reduction
in temporary accommodation and the approach taken in regard to dealing with
people in crisis.  
9.         Moray Affordable Housing Investment Programme 
Page 9

Page 10

A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Committee of progress on the Affordable Housing Investment
Programme in Moray. 
Following consideration, the Committee agreed to: 
i. note the progress on the Moray Affordable Housing Investment Programme; 
ii. note progress on the delivery of the Council's new build and acquisition
programme; 
iii. the potential for accelerated delivery within the Council's own new build
programme; and 
iv. note progress ion delivery of housing at Bilbohall, Elgin.  
10.         Housing Management Review and Service Developments 
A report by the Depute Chief Executive (Economy, Environment and Finance)
provided the Committee with the progress on the review of Housing Management.  It
also included recommendations for service developments which arise from it and
provided an overview of service developments within the 2022/23 budget. 
Following consideration, the Committee agreed: 
i. to note the progress of reviewing the Housing Management structure and
resources; 
ii. that the budget set aside for a Housing Inspector post is amended to recruit 1
FTE mainstream Housing Officer instead; 
iii. to the addition of a further 1 FTE Area Housing manager and 2.1 FTE Housing
Officers to the Housing Management structure; and 
iv. to note the overview of the service developments within the Housing Revenue
Account budge4t for 2022.23 as detailed in paragrapgh 5.2 of the report. 
Councillor Van der Horn left during the discussion of this item due to connection
issues. 
11.         Question Time *** 
Councillor Gatt sought clarification as to when estate walk-abouts by Housing
Officers would be reinstated. 
In response, the Housing Services Manager confirmed that some visits have
restarted but not in all areas.  He confirmed he would get back to Members with a
full response. 
Councillor Fernandes raised a concern that house prices in Moray have increased
by 17.3% in the last year, making it one of the highest in Scotland.  He stated that
the house prices in Moray were still below the national average, but that Moray had
a low wage economy. 
Page 10

Page 11

He was of the opinion that some people moving into the area for work were having
to stay in Air BnB for up to six months before finding suitable long term
accommodation due to investors buying up properties for rentals or short term lets. 
He was further of the opinion that the shortage of housing was having a negative
impact on local people wanting to stay in the area and on young professionals
wanting to move to Moray and sought clarification on the view of officers on this
issue and what more the Council could do to meet the housing needs of the local
population. 
In response, the Head of Housing and Property advised that there was a Housing
Need and Demand Assessment currently underway that includes a particular focus
on key workers and incoming workers, and will evidence the extent of the unmet
need in the current housing market. 
He further advised that this comprehensive approach would be used to inform the
subsequent affordable housing development programme, any changes required to
the allocations policy, and the local plan for future developments. 
He clarified that although the full report would not be available until Spring 2023, if
there was evidence of any emerging trends they would be responded to. 
12.         Building Services Trading Operation Budget 2022-23 Annual Budget
and Budget Monitoring [Para 9] 
A confidential report by the Depute Chief Executive (Economy, Environment and
Finance) presented the Committee with the Building Services Trading Operation
Budget for 2022/23 and budget monitoring information for the period to 30 June
2022. 
Following consideration, the Committee agreed to:
i. note the proposed Building Services Trading Operation Budget for 2022/23 as
detailed in section 5 and Appendix I of the report; 
ii. note the service development proposals at a cost of £208k as detailed in section
6 of the report; 
iii. note the 2022/23 Building Services business priorities highlighted in section 7 of
the report; 
iv. note the financial information for the period to 30 June 2022, as detailed in
section 8 and Appendix II of the report; and 
v. note Building Services operating performance for the period to 30 June 2022, as
set out in section 9 of the report. 
13.         Provision of Temporary Homeless Accommodation [Para 1 and 2] 
A confidential report by the Depute Chief Executive (Economy, Environment and
Finance) informed the Committee of the intent to cease commissioning a supported
accommodation service in Elgin for the purpose of providing temporary
accommodation to people who are homeless, as defined in Housing (Scotland) Act
1987, Part II, (Homeless Persons), as amended. 
Following consideration, the Committee agreed:
Page 11

Page 12

i. to the proposed closure of the temporary accommodation property detailed in
paragraph 4.1 of the report; 
ii. to note that the Council will monitor and reconfigure our stock of temporary
accommodation, where required, in order to mitigate the impact of the
aforementioned closure; and 
iii. to note that officers will work with Sacro to manage the transition to the new
model, including exploration of future employment opportunities for affected
employees.   
Page 12

Page 13

REPORT TO: HOUSING AND COMMUNITY SAFETY COMMITTEE ON 15
NOVEMBER 2022                                                                                                       
SUBJECT: PERFORMANCE REPORT (HOUSING AND PROPERTY
SERVICES) – PERIOD TO SEPTEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the performance of the service for the period to 30
September 2022. 
1.2 This report is submitted to Council in terms of Section III (A) (4) of the
Council's Scheme of Administration to monitor performance of the services
within the Committee’s remit in accordance with the Council’s performance
management framework. 
2. RECOMMENDATION 
2.1 It is recommended that Committee: 
(i) Scrutinises performance in the areas of Service Planning, Service
Performance and other related data to the end of September 2021;
and 
(ii)  Notes the actions being taken to improve performance where 
required. 
(iii)  Notes compliance with the Scottish Social Housing Charter with  
inclusion of the Annual Assurance statement and publication of  
the Scottish Landlords Annual Performance Report. 
3. BACKGROUND 
3.1 On 7 August 2019, the Moray Council, approved a revised Performance
Management Framework for services (para 5 of the minute refers).   
4. SERVICE PLANNING 
4.1 Each service plan sets out the planned strategic and service level priorities
and outcomes it intends to deliver in the coming year aligning closely with
financial planning, corporate and community planning partnership strategic
Item 6.
Page 13

Page 14

priorities. This report provides an interim update on progress on the service
plan, key outcomes and performance indicators.   Committee is invited to
review progress to secure assurance that is satisfactory and to provide
scrutiny and further direction where performance requires attention. 
4.2 The narrative included is by exception, links to Service Plan Actions and
Performance Indicators can be accessed within the Backing Papers of this
report. 
Strategic Outcomes – Successes 
4.3 Progress against recommendations set out in the Property Asset
Management Appraisal (PAMA) was reported to the Corporate Committee in
August 2022 (item 7 of the Agenda refers) with revised timescales and future
reporting arrangements detailed. (ACTION: HP23-4.1aiii) 
4.4 Purchase of land for industrial development in Forres is progressing well with
negotiations at an advanced stage, although it is anticipated that completion
of conveyancing will slip back slightly beyond the 31 March target completion
date. (ACTION: HP23-4.2) 
Strategic Outcomes – Challenges and Actions to Support 
4.5 Revision of the Depot Review to incorporate climate change was not
completed within the due date of August 2022.  A progress report was
submitted to the Economic Development and Infrastructure Services
Committee on 6 September (item 7e of the Agenda refers) reporting an outline
business case is in development with recommendations anticipated by March
2023 with actions taken meantime to deliver early savings within the portfolio.
(ACTION: HP23-4.1aii) 
4.6 Land purchase for industrial development in Speyside will not progress as
planned due to site planning and access restrictions. Alternative sites in
Speyside are being explored, if identified a new timeline will be prepared.
(ACTION: HP23-4.2) 
RAG
Implementation of Property Asset Management
Appraisal (PAMA) 76%
Purchase land for industrial development 33%
Enhance Tenant Participation 2%
Best Value review of Housing Maintenance
Partnership 40%
Systemic Review of Voids 70%
Rent Setting Policy Review 8%
Review of Rapid Rehousing Transition Plan
(RRTP) 33%
Annual reviews of asset valuations for financial
reporting 46%
Improvements to ICT systems within Asset Team 13%
Effective Delivery of Housing Management
Service 83%
40%OVERALL PLAN PROGRESS
SERVICE LEVEL
SERVICE PLAN PRIORITIES
STRATEGIC
LEVEL
Page 14

Page 15

4.7 Enhancing tenant participation is dependent on the recruitment of Customer
Engagement Officers. With posts approved in June, job evaluation processes
are pending but likely to be delayed due to capacity issues within Human
Resources. The timeline for completion of this priority of March 2023 will be
subject to significant slippage. (ACTION: HP23-4.3) 
Service Level Outcomes - Successes  
4.8  A systemic review of voids to reduce overall timescales to re-let void
properties and associated void rent loss is progressing.  The Review Group
meet regularly and a number of improvements have been implemented over
the last six months resulting in a slight improvement in performance despite
the challenges of ongoing labour shortages, utility provider issues and
concurrent repairs. However, significant improvement is still required to meet
performance targets and it is unlikely this will be achieved in the current year.
(ACTION: HP23-5.1, H5.4, 5.6) 
4.9 The review of the Rapid Rehousing Transition Plan was completed as
planned, submitted to the Scottish Government in August 2022 and presented
to this Committee on 6 September 2022 (item 8 of the Agenda refers). 
(ACTION: HP23-5.3a) 
4.10 Annual reviews of asset valuations are progressing with both formal and
informal engagements around best practise ongoing with final valuation
proposals to be delivered to the Chief Financial Officer and external auditor as
scheduled by April 2023. Work on the new Asset Management and Asbestos
modules is due to complete in October allowing the build, training and
implementation to begin. (ACTIONS: HP23-5.4, 5.5) 
Service Level Outcomes – Challenges and Actions to Support 
4.11 Officers are considering new rental structure options presented by consultants
ahead of putting forward a final approach to tenants for consultation early next
year, slightly adrift of the original due date of September 2022. This is distinct
from the annual rent consultation which will take place in December 2022.
(ACTION: HP23-5.2). 
4.12 As at September 2022, gross rent arrears totalled £1.146m, 5.5% of rent due,
the highest result recorded to date.  The cost of living crisis with increasing
inflation, fuel and energy costs are key contributory factors to this worsening
trend. Housing Officers are increasing engagement with tenants to assist in
resolving challenges with maintaining rental payments and this is a key focus
in the forthcoming enhancement of the area teams. (INDICATORS: H5.3, 5.5) 
4.13 Following implementation of the new online housing application in May 2021,
performance against processing has been erratic as around 3,000 applicants
had to re-register.  The percentage of housing applications admitted to list
within 10 days has improved in the last quarter from 45.9% to 85.3%, however
performance remains just below target. (INDICATOR: H4.15) 
5. SERVICE PERFORMANCE 
5.1  In line with the Performance Management Framework, operational
performance is reviewed quarterly by departmental management.  Areas
Page 15

Page 16

performing well and/or areas subject to a decreasing trend or where
benchmarking results show performance significantly below comparators will
be reported to this committee for member scrutiny. 
5.2 The narrative included in this report is by exception, links to Service
Performance Indicators can be accessed within the Background Papers at the
end of this report. 
Operational Indicators - Successes 
5.3 The number of repairs made to non-void properties within target time has
decreased by around 20% compared to the same period last year but the
percentage of those completed on time has improved. There has been
general improvement across all repairs indicators in the first half of 2022-23,
albeit some indicators remain below target. (INDICATORS: H2.7, 2.8, 2.9a,
2.9b, 2.10b, 2.10c, 2.10d, 2.11, 2.12) 
Operational Indicators - Challenges and Actions to Support 
5.4 The percentage of reactive repairs to void properties completed within
timescale at 17%, shows a slight improvement. To address and further
understand delays, the service is now tracking the time between the keys
being handed to the contractor and completion of works. (INDICATOR:
H2.10e) 
5.5 As at September 2022, 90% of emergency repairs were completed with 4
hours, below target but on an improving trend over the last six months.
(INDICATOR: H2.10a) 
5.6 There was one failure in meeting statutory gas safety checks due to
scheduling, this has since been completed. (INDICATOR H2.13a) 
5.7 There were six unauthorised traveller encampments in the reporting quarter,
all have been visited, albeit four out with target timescales. (INDICATOR:
H6.2)   
6. OTHER PERFORMANCE RELATED DATA 
Complaints & MP/MSP Enquiries
35
Page 16

Page 17

6.1 In line with the Performance Management Framework, complaints are
reviewed quarterly by departmental management in terms of time taken to
respond, outcome and learning points. Links to complaints tables can be
accessed within the Backing Papers of this report. 
6.2 In the half year to September 2022, 83 complaints were closed, of which 73
(88%) were frontline stage, 7 (8%) were investigative stage and 3 (4%) were
escalated. This compares to 81 closed in the same period last year, 70% at
frontline stage, 22% at investigative stage and 7% escalated. 
6.3 Of those closed at frontline stage, 51 (70%) were either upheld or part upheld.
90% of frontline complaints were completed within the target of 5 working
days, on average taking 5.1 days to complete. 
6.4 Of those closed at investigative and escalated, 5 (90%) were either upheld or
part upheld. 92% of investigative and escalated complaints were completed
within the target of 20 working days; on average taking 19.2 days to complete. 
6.5 The majority of upheld or part-upheld complaints relate to repairs, capital,
planned maintenance, with corrective actions put in place for each. There has
been considerable work undertaken to address factors which have contributed
to these issues, including the implementation of a change management plan
in relation to asset management and approval to enhance the team in order to
effectively manage the increased volume of improvement work.   
6.6 In the same reporting period, 103 MP/MSP were dealt with compared to 92 in
the same period last year.  
Other Performance (not included within Service Plan) 
7 Annual Assurance Statement 
7.1 The Scottish Social Housing Charter came into force on 1 April 2012.  The
aim of the Charter is to improve the quality and value of the services provided
by social landlords. The Charter sets out the minimum standards and
outcomes that tenants can expect from their landlord, including the quality of
and value for money of services, the standard of homes and the opportunities
to participate in their landlord’s decision-making processes. Using a range of
performance indicators, the Scottish Housing Regulator (SHR) monitors, and
assesses landlords’ performance against the Charter. 
7.2 Each year, social landlords must submit an Annual Return on the Charter
(ARC) to the Scottish Housing Regulator. The SHR requires social landlords
to submit an Assurance Statement by 31 October each year which assures
the SHR, our tenants and other service users that we comply with our
regulatory and statutory obligations. In preparation for this submission,
officers delivered a briefing to Elected Members and the Assurance Statement
and Annual Performance Report is being presented as an agenda item to this
Committee. 
8 Social Landlords Annual Performance Report 
Page 17

Page 18

8.1 The SHR requires social landlords to produce an annual report on their
performance against the Charter and make it available to tenants and other
customers by no later than 31 October. 
8.2 The SHR expects the report to be developed in partnership with tenants and
other customers, rather than exclusively by the Council. The format, content
and design of the Council’s report has been developed in discussion with the
Moray Tenants’ Forum.  The report mirrors the key themes of the Charter.   
9. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Performance measurement is used to ensure the efficient and
sustainable delivery of services to meet the Council’s priorities in both
the Corporate Plan and the LOIP. 
(b) Policy and Legal
The Council has a statutory requirement to publish a range of
information that will demonstrate that it is securing best value and assist
in comparing performance both over time and between authorities where
appropriate. 
(c) Financial implications
None. 
(d) Risk Implications
None. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as this report is to inform
the Committee on performance. 
(h) Climate Change and Biodiversity Impacts 
None 
(i) Consultations
The Head of Housing and Property Services, Depute Chief Executive
(Economy, Environment and Finance) and Service Managers have been
consulted with any comments received incorporated into this report. 
10 CONCLUSION 
10.1 As at the end of September 2022, the overall plan is 39% complete.
Actions subject to slippage will be progressed over the second half of
2022-23. 
Page 18

Page 19

.
Author of Report: Christopher Dewhurst, Research & Information Officer
Background Papers: Service Plan Actions 
Service Plan Performance Indicators 
Service Performance Indicators 
Service Complaints
Ref: 
Page 19

Page 20

Page 20

Page 21

REPORT TO:   HOUSING AND COMMUNITY SAFETY COMMITTEE ON 15
NOVEMBER 2022 
SUBJECT: HOUSING AND PROPERTY SERVICES BUDGET MONITORING –
30 SEPTEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report presents the budget position for the Housing Revenue Account
(HRA) and General Services Other Housing Budget for the period up to 30
September 2022. 
1.2 This report is submitted to Committee in terms of Section III G (1) of the
Council's Scheme of Administration relating to the management of budgets. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee scrutinises and notes the budget
monitoring report for the period to 30 September 2022. 
3. BACKGROUND 
3.1 Full Council agreed the HRA Budget for 2022/23 at the meeting on 22
February 2022 (paragraph 5 of the Minute refers). Housing and Property
budget monitoring reports are presented quarterly. 
4. HOUSING REVENUE ACCOUNT TO 30 SEPTEMBER 2022 
4.1 APPENDIX I details the HRA budget position to 30 September 2022. 
4.2 The main expenditure variances relate to:– 
4.2.1 Supervision and management – there are a range of variations within this
budget resulting in a net underspend of £78k. This includes underspends in
staffing (£89k), arising from vacancies and the budget provision for pay
award, £10k for software due to invoice timing and £5k for other minor
cumulative underspends including training. This was partially offset by an
overspend in relation to voids (£26k). 
Item 7.
Page 21

Page 22

4.2.2 Sheltered Housing – there was an overspend of £18k in the sheltered
housing budget, which is comprised of repairs and maintenance related to fire
protection and other works (£7k), rates for a property previously occupied by a
day service (£6k), increased energy costs (£4k) and other minor cumulative
spend of £1k. 
4.2.3 Repairs and maintenance – there was an underspend of £477k in the
repairs and maintenance budget, which arises from reduced activity in
planned/cyclical maintenance (£398k), an underspend in voids (£54k) and
response repairs (£25k). It should be noted that this underspend in voids
reflects the ledger position at the end of quarter and does not include
accruals. Actual activity levels in this area are in line with budgeted provision.
The planned/cyclical position included main variance underspends in
asbestos (£104k), external decoration and fabric repairs (£211k), rainwater
goods (£104k), roof moss clearance (£83k) and disabled adaptations (£29k).
These arose due to the timing of programming the works and limitations within
the service, which were partially offset by an overspend of £149k in electrical
upgrades. 
4.2.4 Bad and doubtful debts – there was an underspend of £7k against provision
for bad & doubtful debts. 
4.2.5 Downsizing Incentive Scheme – there was an underspend of £18k, with
fewer transfers taking place. Work has commenced on increasing the uptake
following restrictions easing, which is expected to increase spend as the year
progresses. 
4.2.6 Service Developments – there is an underspend of £209k, with recent
committee approval for a number of posts progressing through evaluation and
recruitment processes. 
4.2.7 The income at 30 September 2022 was £57k lower than expected. This is due
mainly to the revised completion of the new development at Keith (£46k),
fewer tenant recharges (£9k) and lower yield of non-dwelling rents (£2k). 
5. HRA PROJECTED OUTTURNS 2022/23 
5.1 APPENDIX I also details projected outturns for 2022/23. 
Expenditure
5.2 Supervision and management - An overspend of £168k is projected.  This
variance results from projected increases in staffing costs (£165k) following
the higher than budgeted pay award, increased void costs (£49k), increased
Council Tax costs (£9k), which are anticipated to be partly offset by an
underspend in software (£55k). 
5.3 Sheltered Housing – There is a projected overspend of £42k anticipated due
to excess energy costs due to higher unit costs (£27k), responsibility for rates
for a former day service property (£6k), repairs and maintenance (£8k) and
other minor cumulative overspends (£1k). 
Page 22

Page 23

5.4 Repairs and Maintenance - An overspend of £163k is projected. This is
composed of a deficit in the DLO of £187k against a £100k budgeted surplus,  
arising from higher staff costs, additional sub-contracting and elevated
material and fuel costs, in addition to an overspend in voids (£200k). These
are partially offset by a projected underspend in planned/cyclical maintenance
of £324k, arising from lower activity levels due to service capacity. 
5.5 Financing costs - An overspend of £705k is projected due to estimated
higher interest costs on borrowing. It is acknowledged that there is
considerable volatility in relation to interest rates at present, therefore this
position is likely to vary prior to the year end. 
5.6 Bad and Doubtful debts - An underspend of £65k is projected due to lower
write-offs, however the position remains uncertain following the impact of the
pandemic on arrears, the cost of living outlook and the recent restrictions
placed on evictions.   
5.7 CFCR - The level of Capital from Current Revenue (CFCR) is projected to be
£740k higher due to underspends elsewhere across the HRA budget, which
will offset anticipated borrowing. 
5.8 Downsizing Incentive Scheme – An underspend of £22k is projected due to
fewer transfers taking place. 
5.9 Service Developments – An underspend of £192k is currently projected due
to the lead-in time from approval of new posts to recruitment processes
concluding. 
5.10 Total expenditure on the HRA - Projected to be £59k lower than budgeted. 
Income
5.12 Total income to the HRA is projected to be £59k lower than originally
budgeted for 2022/23, with £118k additional interest on revenue balances
projected due to the higher interest rates, partially offset by £44k lower rental
income due to the delayed completion of new build properties in Keith and
£15k lower yield in other income. 
5.13 Overall, a surplus balance of £2.465m is projected for the HRA budget in
2022/23. 
6. OTHER HOUSING BUDGET 
6.1 APPENDIX II provides details of the budget position to 30 September 2022. 
6.2 Planning and Development - consists of Improvement Grants and
Affordable Housing budgets, including disabled adaptations. The position at
30 September 2022 shows an underspend of £57k, arising from an
underspend in discretionary grants (£48k) and £9k higher than anticipated
grant income. 
Page 23

Page 24

6.3 Housing Management - relates to the Gypsy/Traveller budget. The position
at 30 September 2022 shows an underspend of £2k, arising from lower site
clearance costs than budgeted. 
6.4 Homelessness/Allocations - comprises of Homelessness and Housing
Support services. There was an overspend of £103k in this budget, comprised
of overspends in Temporary Accommodation (£80k), Housing Support (£15k)
and general Homelessness (£8k). Given the significant changes in the service
whilst service charges have been frozen in recent years, a review predicated
on full cost recovery will take place from 2023/24.   
6.5 The Building Services Budget - is reported in detail separately on this
Committee’s agenda and any surplus achieved or deficit will be returned to
the HRA. 
6.6 The Property Services Budget - includes the budgets for the Design Team
and Property Resources. There is an overall overspend of £12k to date.
Within the Design Team there was an underspend in consultancy (£8k) and
an overspend in software (£11k). Within Property Asset Management there
were underspends in shared buildings (£19k), central repairs & maintenance
(£34k) and other cumulative underspends (£7k), which were offset by
overspends in Industrial Estates (£39k), school repairs and maintenance
(£28k) and management of corporate surplus property (£2k).  
6.7 The service has also holds a £4k underspend in relation to the Tenant
Hardship Fund, set up by the Scottish Government to assist tenants struggling
as a direct consequence of the pandemic, which will be utilised in the course
of the year. 
6.8 As at 30 September 2022, the Other Housing budget shows a net overspend
of £46k.   
7. OTHER HOUSING PROJECTED OUTTURNS 2022/23 
7.1 APPENDIX II also indicates the projected outturns for 2022/23. 
7.2 Planning and Development - Projected to underspend by £13k. This is
based on an anticipated underspend in discretionary grants and admin. 
7.3 Housing Management - Projected to underspend by £7k. This arises from
end of year recharges to the Housing Revenue Account (£4k) and lower site
clearance costs (£3k). 
7.4 Homelessness/Allocations - Projects an underspend of £137k. An
anticipated overspend in housing support (£22k) and temporary
accommodation (£150k) is expected to be offset by an underspend of £309k
in the wider homelessness budget. This budget position does however include
a carry-forward of £319k for the Rapid Rehousing Transition Plan to 2025/26,
therefore the in-year position is an overspend which is being managed. 
Page 24

Page 25

7.5 Miscellaneous General Services Housing - Projects an underspend of £9k.
The main reason for this is lower than anticipated repairs and maintenance
costs relating to Urquhart Place. 
7.6 Building Services - Projected outturn is considered in further detail in the
separate report on the Committee’s agenda. 
7.7 Property Services - Projects an overspend of £74k. This is comprised of
anticipated overspends of £12k in Property Design and £62k in Industrial
Estates, arising from additional costs. 
7.8 Housing and Property Savings – Staffing savings are anticipated to be
£101k less than the budgeted provision, being dependent on vacancy levels. 
7.9 Overall, it is now projected that the Other Housing Budget in General Services
will overspend by £17k on the agreed budget, noting that £319k is to be
carried forward for the Rapid Rehousing Transition Plan. 
8. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The provision of new affordable housing, the maintenance of the
Council’s housing stock and dealing with homelessness are priorities
identified within the Corporate Plan, the Council’s Local Housing
Strategy, the Strategic Housing Investment Plan (SHIP) and the Housing
and Property Service Plan. 
(b) Policy and Legal
There are no policy or legal implications arising from this report. 
(c) Financial Implications
The financial implications of this report are considered in Sections 4 to 7
of this report and detailed in APPENDICES I and II. 
(d) Risk Implications
Budget Managers are aware of their responsibilities for managing budget
allocations and approval for variance will be sought from the Committee
in line with Financial Regulations. 
(e) Staffing implications
There are no staffing implications arising from this report. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
There are no equalities/socio economic impacts arising from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change/biodiversity impacts arising from this report. 
Page 25

Page 26

(i) Consultations 
This report has been prepared in close consultation with Finance staff.
Consultation on this report has been carried out with Lorraine Paisey
(Chief Financial Officer), Georgina Anderson (Legal Services Senior
Solicitor), Senior Managers within Housing and Property Services and
Lindsey Robinson (Committee Services Officer) who all agree the
content of the report where it relates to their area of responsibility. 
7. CONCLUSION 
7.1 This report sets out the budget position for the HRA and General
Services Housing budgets to 30 September 2022 and also comments on
the variances on these budgets. 
Author of Report: Edward Thomas, Head of Housing and Property
Background Papers:   Held by author
Ref:    SPMAN-1285234812-1180
Page 26

Page 27

Housing Revenue Account           Appendix I       
Budget Monitoring to 30th September 2022     
Service Description
Annual
Budget
2022-23
Budget to
30 Sept
2022
Actual to
30 Sept
2022
Variance
to 30 Sept
2022
Projected
Outturn to
31 Mar
2023
Projected
Variance
to 31 Mar
2023
Expenditure £,000 £,000 £,000 £,000 £,000 £,000
Supervision & Management 4,533 1,774 1,696 78 4,701 (168)
Sheltered Housing 25 13 31 (18) 67 (42)
Repairs and Maintenance 7,956 3,357 2,880 477 8,119 (163)
Financing Costs 4,096 0 0 0 4,801 (705)
Bad & Doubtful Debts 225 37 30 7 160 65
CFCR 4,303 0 0 0 3,563 740
Downsizing Incentive Scheme 72 36 18 18 50 22
Service Development 456 228 19 209 264 192
Total Gross Expenditure 21,666 5,445 4,674 771 21,725 (59)              
Income £,000 £,000 £,000 £,000 £,000 £,000
Non-dwelling rents 242 135 133 (2) 242 0
House rents 21,335 11,113 11,067 (46) 21,291 (44)
IORB 2 0 0 0 120 118
Other income 87 42 33 (9) 72 (15)
Total Income 21,666 11,290 11,233 (57) 21,725 59              
Surplus / (Deficit) for the
year 0 5,845 6,559 714 0 0              
Accumulated Surplus
Balance brought forward     2,465   2,465                
Estimated Surplus Balance
at 31 March     2,465   2,465   
Item 7.
Page 27

Page 28

Page 28

Page 29

General Services Housing & Property         Appendix II         
Monitoring to 30 September 2022         
Service Description      
Annual Budget 
Actual &
committed Variance Projected  Projected 
Budget to to at  Outturn Variance
2022-23 30 Sept
2022
30 Sept
2022
30 Sept
2022 2022-23 2022-23
£'000 £'000 £'000 £'000 £'000 £'000
Planning & Development    
Housing Management    
Homelessness / Allocations    
Miscellaneous General Services
Housing    
Building Services    
Property Services    
General Services Housing & Property
Savings    
General Services Housing & Property
Allocations 
Covid 19 - GS Housing & Property     
250 125 68 57 237 13           
18 18 16 2 11 7           
2440 1094 1197 (103) 2303 137           
(20) (10) (16) 6 (29) 9             
0 (65) (65) 0 8 (8)            
2315 1671 1683 (12) 2389 (74)             
(101) 0 0 0 0 (101)             
(161) 0 0 0 (161) 0             
39 39 35 4 39 0            
General Services Housing & Property
Total  4780 2872 2918 (46) 4797 (17) 
Item 7.
Page 29

Page 30

Page 30

Page 31

REPORT TO:   HOUSING AND COMMUNITY SAFETY COMMITTEE ON 15
NOVEMBER 2022  
SUBJECT: HOUSING INVESTMENT 2022/23 TO 30 SEPTEMBER 2022 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report informs the Committee of the progress of the Housing Investment
Programme 2022/23 to 30 September 2022. 
1.2 This report is submitted to Committee in terms of Section III G (3) of the
Council's Scheme of Administration relating to the maintenance of the
Council’s housing stock. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider and notes:- 
(i) the progress of the Housing Investment Programme to 30
September 2022, as detailed in Section 3 and Appendices I to VI;
and 
(ii) the revised Housing Investment Programme projected outturn to
31 March 2023, as detailed in Section 3 and Appendices I to VI of
the report. 
3. BACKGROUND 
Investment Programme
3.1  APPENDIX I shows income and expenditure up to 30 September 2022.
The figures show an overall spend to 30 September 2022 of £4,384k was
achieved, which represents a spend of 24% against the £18,539k annual
budget.  
3.2 The Housing Investment Programme is a series of individual programmes of
works which are designed to maintain and improve the quality of the Council’s
housing stock.  The Council has a requirement to meet standards set by the
Scottish Government in relation to the basic standard of the properties we let
along with their energy performance.  This information is reported annually to
the Housing Regulator indicating our performance against various standards. 
Item 8.
Page 31

Page 32

3.3  A stock condition survey was undertaken in 2021 to establish the overall
condition of our residential properties and from this survey the programme for
2022/23 and beyond was developed.  As reported to the Moray Council on 22
February 2022 there is significant spend required to improve and then
maintain the housing stock (paragraph 5 of the minute refers).   The report in
February indicated that investment of over £20million per annum will be
required from next financial year and thereafter. There are many challenges in
delivering this multi project and year programme not least ensuring there is
capacity within the Council to deliver, monitor and review the projects but also
the capacity in the in-house and external contractors required to deliver the
works efficiently and to appropriate standards.     
3.4  The level of expenditure within the individual budget headings that make up
the programme are shown in paragraphs 3.5 to 3.13 below.  The expenditure
figure represents all payments which have progressed through the finance
system to 30 September 2022.   
3.5  APPENDIX II shows expenditure on Response and Void Repairs.  Spend was
£1,974k to 30 September 2022.  This budget includes reactive repairs
(£1,434k) undertaken by the Council’s Building Services (DLO) which are
generally triggered by a tenant contacting the Council’s contact centre and
requesting a repair to their property.  Repairs to void properties (£540k) as a
result of tenancy changes, are also included. 
3.6  APPENDIX III shows expenditure on Estate Works.  Spend of £193k was
achieved to 30 September 2022.  This area of work is general works to the
landscaping and external areas within Council owned housing areas. Included
within the area is asbestos works and surveys with significant spend required
over the next few years to ensure we have accurate surveys of our properties.   
3.7  APPENDIX IV shows expenditure on Cyclic Maintenance.  A spend of £187k
was achieved to 30 September 2022.  This area of work includes regular
annual servicing of heating systems installed within our properties that
includes gas, solid fuel, and air source heating systems.  External paintwork is
also included under this budget head, which is an area which has lacked
investment.  A 7 year programme for external decoration by location has been
developed with all external decoration within the Housing portfolio to be
completed over that timeframe.  The programme will then roll into the future to
ensure that no property goes longer than 7 years without redecoration. 
3.8  APPENDIX V shows expenditure on Planned Maintenance and Other
Investments.  A spend of £2,151k was achieved to 30 June 2022.  This is the
main section of the overall programme that looks to undertake significant
improvements to the housing stock in order to meet the regulator
requirements.  Significant programmes at the moment include installation of
new heating systems to approximately 500 properties.  These are identified in
the appendix as EESSH Warm Homes R4 and LCITP which have both been
carried forward from last year due to issues with delivery of materials and
components.  These works along with EESSH Insulation, central heating
upgrades, and window and door replacements are all designed to improve the
energy performance of our housing stock.  In addition this area includes
significant spend in relation to electrical installations.  There is a regulator
requirement that every dwelling within the portfolio is regularly electrically
Page 32

Page 33

tested at least every 5 years.  A periodic programme of full electrical testing
has not been in place previously.  However, investment works over the past
decade have involved key elements of electrical upgrade work as part of
planned/cyclical maintenance programmes.  This was recorded on partial
electrical certificates rather than full Electrical Installation Condition Reports
(EICRs), meaning that most of the Council’s properties are slightly below the
required certification standard. A significant programme of full electrical
testing is being implemented over the next 12 to 18 months which will require
the focusing of budget and resource in this area during this period. 
General Programme Updates
3.9 A programme to upgrade smoke alarms in all Council properties in
accordance with new legislation in the aftermath of the Grenfell tragedy is
drawing to a conclusion.  The appointed contractor completed 4,986 house
upgrades to 30 September 2022.  Building Services DLO is also carrying out
upgrades to properties as part of void and planned maintenance works, with a
further 920 properties upgraded to 30 September 2022.  This means that
5,906 (95%) of properties were completed to the new standard at 30
September 2022.  The target for compliance was February 2022. This has
subsequently been relaxed by the Scottish Government (currently no new
deadline yet confirmed) and as at 30 September 2022, 324 properties still
require to be completed, all of which have had attempted access attempts,
without success.   
3.10  As a result of the no access issues experienced, we have now moved to
forced entry to gain access to undertake this work, which is being carried out
in accordance with our agreed forced entry procedure. Forced entries
commenced on 24 October 2022, with the majority of tenants allowing access,
after receiving prior warning of our intention to enter 7 days in advance of
forcing entry. 
3.11  The Committee approved service developments at the meeting on 6
September 2022 (paragraph 10 of the minute refers) and progress is being
made in finalising the new job descriptions with the intention to have some of
these posts advertised prior to the end of this financial year.  The priority is to
secure the tenant liaison officer to help the team be more proactive in its
communication with tenants. 
Income and Expenditure for Private Sector Housing
3.12 APPENDIX VI shows the position with regard to grant expenditure for Private  
Sector Housing Grant to 30 September 2022. The legally committed figure in
Category C of £55k represents 48.7% of the allocated budget.  Spend to 30
September 2022 was £10k which represents 0.08% of the allocated budget.
£15k has been repaid to this budget (repayment of grant to remove
conditions) which will affect both the spend and legally committed figures.  It is
anticipated that this budget will fully commit by 31 March 2023. 
Investment Programme - Projected Outturn to 31 March 2022
3.13  APPENDICES I to VI also include revised outturn projections to 31 March
2023 for each budget heading of the Housing Investment Budget 2022/23. 
The current projection anticipates year-end expenditure to be £15,858k, which
represents spend of 86% against the £18,539k annual budget.  This is
£2,681k less than the agreed budget, with the anticipated shortfall in
Page 33

Page 34

investment attributable to a number of factors that include design, supply
chain and procurement issues, accompanied by internal staff resourcing
issues in Building Services (DLO), as well as lack of resources and a key
absence in the Asset Team.  Key underspends are highlighted throughout the
report, with the key underspends highlighted in APPENDIX I of the report. 
Service Managers are continue to meet regularly to closely monitor this
budget, and a number of risks are still evident that may reduce the actual
outturn further.   
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The provision of new affordable housing, the maintenance of the
Council’s housing stock and dealing with homelessness are priorities
identified within the Corporate Plan, the Council’s Local Housing
Strategy, the Strategic Housing Investment Plan (SHIP) and the Housing
and Property Service Plan. 
(b) Policy and Legal
Maintenance and improvement works are carried out in order to meet
statutory legal requirements and in accordance with current relevant
policies. 
(c) Financial implications
The financial implications associated within this report are dealt with in
paragraphs 3.1 to 3.13 above, with details of the Council house new
build programme now being the subject of a separate monitoring report. 
(d) Risk implications
Failure to expend agreed budgets may affect the Council’s ability to
maintain stock at the SHQS, replace life expired elements and attain the
EESSH.  Budget Managers are aware of responsibilities for managing
budget allocations and approval for variance will be sought from
Committee in line with the Financial Regulations. 
(e) Staffing implications
As detailed in paragraph 3.11 there is the intention to extend the
Housing Asset Management Team to meet the demands of the
investment programme with the cost of these additional resources being
met by the Housing Revenue Account from the Service Development
budget approved at Council on 22 February 2022. 
(f) Property
The improvement and maintenance of the housing stock will ensure that
it remains sustainable in the longer term both physically and
environmentally. 
(g) Equalities/Socio Economic Impact
There are no equalities issues associated with this report, as it is to
inform the Committee on budget monitoring. 
(h)   Climate Change and Biodiversity Impacts
Page 34

Page 35

The continued investment in the Council Owned Housing Stock identified
in this report will assist the Council to achieve its climate change targets
by utilising a range of energy saving measures that incorporate zero or
low carbon into design, construction materials and systems that support
the Council in achieving The Energy Efficiency Standard for Social
Housing (EESSH). 
(i) Consultations
Consultations have taken place with the Head of Housing and Property
Services, Building Services Manager, Design Manager, Principal
Quantity Surveyor, Legal Services Manager, Principal Accountant
(Deborah O’Shea), Lindsey Robinson (Committee Services Officer), and
Home Improvement Services Manager, who all agree with the sections
of the report relating to their areas of responsibility.   
5. CONCLUSION 
5.1 The report shows that the Council’s progress in respect of Housing
investment for both the Council’s housing stock and the private sector
has been adversely impacted due to a number of factors.  The outturn
forecast provided anticipates a £2,691k (14%) underspend in the 2022/23
Housing Investment Programme.  Recovery of programmes is essential
to enable the Council to address the identified priorities to improve the
quality of housing stock in Moray.  More specifically, the ongoing
investment in the Council’s housing stock enables it to be maintained at
the Scottish Housing Quality Standard, allows for replacement of life
expired elements and makes progress towards the attainment of both
the Moray Standard and the Energy Efficiency Standard for Social
Housing. 
Author of Report: Neil Strachan, Property Asset Manager 
Background Papers:   Held on file/sharepoint
Ref:    SPMAN-1285234812-1208
Page 35

Page 36

Page 36

Page 37

APPENDIX I
(all amounts in £'000)
HOUSING INVESTMENT PROGRAMME
Annual Budget
2022/23
Expenditure plus
commitments to
date
%
expendituere plus
committed to date
Expenditure to date
%
Budget spent to
date
Budget balance
Projected outturn
Expenditure
Response, Gas & Void Repairs 4,487 1,974 44% 1,974 44% 2,513 4,687
Estate Works 665 241 36% 193 29% 472 500
Cyclic Maintenance 857 212 25% 187 22% 670 515
Planned Maintenance (Revenue) 1,550 1,655 107% 533 34% 1,017 1,753
Planned Maintenance (Capital) 10,610 9,153 86% 1,497 14% 9,113 8,053
Other Investment 370 121 33% 0 0% 370 350
Sub Total 18,539 13,356 72% 4,384 24% 14,155 15,858
Other Capital Expenditure
New Build - Capital Costs 14,099 1,362
Total 32,638 5,746
Funded by
HRA Revenue 7,929 2,887 36%
Government Grant 11,200 1,011 9%
Use of Council Tax Discount 600 0 0%
Prudential Borrowing 6,866 1,848 27%
Other Grants 1,740 0 0%
Capital Receipts 0 0 0%
C.F.C.R 4,303 0 0%
Total 32,638 5,746 18%
INVESTMENT PROGRAMME INCOME AND EXPENDITURE 2022/23
30 September 2022
Item 8.
Page 37

Page 38

Page 38

Page 39

APPENDIX II
(all amounts in £'000)
RESPONSE AND VOIDS REPAIRS
Annual Budget
2022/23
Expenditure plus
commitments to date
%
expendituere plus
committed to date
Expenditure to date
%
Budget spent to
date
Budget balance
Projected Outturn
West Area Office 1,386 768 55% 768 55% 618 1,386
East Area Office 1,074 480 45% 480 45% 594 1,074
Void House Repairs 1,427 540 38% 540 38% 887 1,627
Gas Heating Repairs 600 186 31% 186 31% 414 600
4,487 1,974 44% 1,974 44% 2,513 4,687
30 September 2022
INVESTMENT PROGRAMME EXPENDITURE 2022/23
Item 8.
Page 39

Page 40

Page 40

Page 41

APPENDIX III
(all amounts in £'000)
ESTATE WORKS
Annual Budget
2022/23
Expenditure plus
commitments to date
%
expendituere plus
committed to date
Expenditure to date
%
Budget spent to
date
Budget balance
projected outturn
Garage Upgrades 25 0 0% 0 0% 25 0
Asbestos 360 94 26% 46 13% 314 200
Landscape Maintenance 50 5 10% 5 10% 45 50
Estates/Forum Upgrades 230 111 48% 111 48% 119 200
Miscellaneous 0 31 0% 31 0% -31 50
665 241 36% 193 29% 472 500
30 September 2022
INVESTMENT PROGRAMME EXPENDITURE 2022/23
Item 8.
Page 41

Page 42

Page 42

Page 43

APPENDIX IV
(all amounts in £'000)
CYCLIC MAINTENANCE
Projected Outturn
Annual Budget
2022/23
Expenditure plus
commitments to date
%
expendituere plus
committed to date
Expenditure to date
%
Budget spent to
date
Budget balance
Projected outtun
Gas Servicing 360 159 44% 137 38% 223 320
Solid Fuel Servicing 15 1 7% 1 7% 14 15
Air Source Heat Pump Servicing 59 13 22% 10 17% 49 59
Smoke Detector Servicing 15 2 13% 2 13% 13 5
PPR & External Painterwork 358 26 7% 26 7% 332 111
General Servicing 50 11 22% 11 22% 39 5
Inspections/House Surveys 0 0 0% 0 0% 0 0
857 212 25% 187 22% 670 515
INVESTMENT PROGRAMME EXPENDITURE 2022/23
30 September 2022
Item 8.
Page 43

Page 44

Page 44

Page 45

APPENDIX V
(all amounts in £'000)
PLANNED MAINTENANCE & OTHER INVESTMENTS
Projected Outurn
Annual Budget
2022/23
Expenditure plus
commitments to date
%
expendituere plus
committed to date
Expenditure to date
%
Budget spent to
date
Budget balance
Projected outturn
Kitchens and Bathrooms 1,000 1,000 100% 300 30% 700 1,000
Bathroom Replacements 175 111 63% 54 31% 121 111
Central Heating 1,500 1,388 93% 392 26% 1,108 1,388
Doors and Windows 1,100 755 69% 390 35% 710 755
Smoke Alarms/Co Upgrades 375 539 144% 222 59% 153 539
EESSH - Insulation 1,000 0 0% 0 0% 1,000 0
EESSH - Warm Homes R4 c/f 1,860 2,010 108% 0 0% 1,860 2,010
EESSH - Lcitp c/f 2,600 2,600 100% 68 3% 2,532 1,500
EESSH/EESSH 2 1,000 750 75% 71 7% 929 750
Sub Total (Capital) 10,610 9,153 86% 1,497 14% 9,113 8,053
Rainwatergoods 250 50 20% 0 0% 250 50
Rainwatergoods - Roof Moss Cleaning
200 0 0% 0 0% 200 50
Roof and Fabric Repairs 500 278 56% 120 24% 380 278
Plumbing Upgrades 51 57 112% 0 0% 51 57
Electrical Upgrades 396 1,021 258% 314 79% 82 1,021
Safety & Security 21 30 143% 25 119% -4 30
Common Stairs 0 40 0% 30 0% -30 40
Energy Performance Certs (EPC) 0 7 0% 7 0% -7 20
Sheltered Housing 10 97 970% 7 70% 3 97
Decoration Vouchers 72 25 35% 25 35% 47 60
Shower Installations 50 50 100% 5 10% 45 50
Sub Total (Revenue) 1,550 1,655 17 533 3 1,017 1,753
Disabled Adaptations 360 121 34% 121 34% 239 345
Enabling Projects 10 1 10% 1 10% 9 5
Sub Total (Other Investment) 370 121 33% 121 33% 249 350
Total 12,530 10,929 87% 2,151 17% 10,379 10,156
INVESTMENT PROGRAMME EXPENDITURE 2022/23
30 September 2022
Item 8.
Page 45

Page 46

Page 46

Page 47

APPENDIX VI
(all amounts in £'000)
Budget Allocation
2022/23
Spend to date
Balance
Legally Committed
Anticipated Year end
Spend
Completed Cases
CATEGORY
Independent Living
Category C 113 10 103 55 113 8
Overall Total 113 10 103 55 113 8
CATEGORY DESCRIPTIONS
Category C
SCHEME OF ASSISTANCE - 2022/23
PRIVATE SECTOR HOUSING GRANT
Item 8.
Page 47

Page 48

Page 48

Page 49

REPORT TO: HOUSING AND COMMUNITY SAFETY COMMITTEE ON 15
NOVEMBER 2022 
SUBJECT: SCOTTISH SOCIAL HOUSING CHARTER COMPLIANCE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform the Committee of the details of the Council’s 2021/22 performance
following data published by the Scottish Housing Regulator and compliance
with both the Scottish Social Housing Charter and Regulatory Framework. 
1.2 This report is submitted to Committee in terms of Section III (G) (15) of the
Council's Scheme of Administration relating to the Council’s performance
management framework. 
2. RECOMMENDATION 
2.1 It is recommended that the Housing and Community Safety Committee: 
i) reviews the Council’s performance against the Scottish Social
Housing Charter in 2021/22; and 
ii) considers and notes the content of the Assurance Statement and
Annual Performance Report to tenants and other customers. 
3. BACKGROUND 
3.1 The Scottish Social Housing Charter came into force on 1 April 2012.  The
aim of the Charter is to improve the quality and value of the services provided
by social landlords.  The Charter sets out the minimum standards and
outcomes that tenants can expect from their landlord, including the quality of
and value for money of services, the standard of homes and the opportunities
to participate in their landlord’s decision making processes.   
3.2 Each year, social landlords must submit an Annual Return on the Charter
(ARC) to the Scottish Housing Regulator (SHR).  Using a range of
performance indicators, the SHR monitors, and assesses landlords’
performance against the Charter.  To meet regulatory requirements, social
landlords must also produce a performance report for tenants and service
users and submit an Assurance Statement by 31 October each year.
Item 9.
Page 49

Page 50

4. PERFORMANCE BENCHMARKING 
4.1 A summary of the Council’s performance on key Charter indicators can be
found in APPENDIX I and includes data published by the SHR and Scotland’s
Housing Network (SHN).  It should be noted that the average performance for
local authorities tends to be below the Scottish average, which includes all
social landlords (local authorities, housing associations and housing co-
operatives).  The 2021/22 performance is summarised below under 6 themes: 
Overall Satisfaction
4.2 The 2021 tenant survey found that 82.8% of tenants were satisfied with the
overall service provided by their landlord (indicator 1).  This was slightly below
the Scottish average (87.7%) but was in line with the local authority (82.2%)
and peer group averages (83.1%).  The Tenant Survey improvement plan has
been updated and can be found in APPENDIX II. 
The Customer/Landlord Relationship
4.3 The 2021 tenant survey identified that 91.3% of tenants felt that the Council
was good at keeping them informed about services and decisions (indicator
2).  This was similar to the Scottish average (91.2%) but above the local
authority (84.7%) and peer group average (86.5%). 
4.4 In 2021/22, the average time to respond to a complaint (indicator 3-4) was 5
working days for 1st stage complaints and 22 working days for 2nd stage
complaints.  This is better than the Scottish average (1st stage 6 days, 2nd
stage 27 days) and peer group average (1st stage 7 days, 2nd stage 24 days). 
4.5 The 2021 tenant survey identified that 96.2% of tenants were satisfied with
the opportunities given to them to participate in their landlord’s decision
making processes (indicator 5).  This performance is significantly higher than
both the Scottish average (86.8%) and peer group average (80.3%) and
places the Council in the upper quartile for local authorities. 
Housing Quality and Maintenance
4.6 Several changes have been made to the Scottish Housing Quality Standard
(SHQS) in recent years.  From January 2021, the energy efficiency element
was updated to reflect the Energy Efficiency Standard for Social Housing
(EESSH).  Additional changes were introduced in early 2022 to comply with
the amended fire safety regulations and to the tolerable standard relating to
electrical safety.   
4.7 After the ARC submission, in late July 2022 the SHR invited landlords to
reassess their SHQS compliance in relation to electrical inspections. 
Following a review of the Council’s position, the SHR was notified that the
majority of properties fell slightly below the required electrical testing standard
and therefore at 31 March 2022, 6.3% of properties met the SHQS (indicator
6).  There were 4,653 properties which did not meet the SHQS and 1,245
properties which were exempt due to being ‘hard to treat’ or in abeyance
(where work cannot be done for ‘social’ reasons such as the tenant refusing
remedial works).  SHQS has been included within the annual assurance
statement under section 5 of this report along with details of how the Council
will address the non-compliant properties.  The averages within APPENDIX I
Page 50

Page 51

are based on data produced prior to the SHR’s approach to all landlords and
therefore may be overstated.   
4.8 All social landlords must meet the Energy Efficiency Standard for Social
Housing (EESSH).  At 31 March 2022, 60.4% of properties met the EESSH
(indicator C10) which is below the Scottish average (83.1%) and the peer
group average (83.2%).  EESSH has also been included within the annual
assurance statement under section 5 of this report.   
4.9 The 2021 survey found that 82.7% of tenants were satisfied with the quality of
their home (indicator 7).  This was close to the Scottish average of (85.4%),
but more in line with the local authority (80.7%) and peer group average
(82.4%). 
4.10 In 2021/22, the average time to complete emergency repairs (indicator 8) was
3.1 hours which was better than the Scottish average of 4.2 hours and the
peer group average of 5 hours.  Non-emergency repairs (indicator 9) were
completed within an average of 8 working days which was also better than the
Scottish average and peer group average which were both 9 days. 
4.11 The Council completed 85.5% of non-emergency repairs right first time
(indicator 10) in 2021/22 which was slightly below the Scottish average of
88.3% and the peer group average of 86.1%. 
4.12 During 2021/22, only 4 of the Council’s properties did not have a gas safety
check completed by the anniversary date (indicator 11).  This performance
was better than the peer group average (33) which includes local authorities
with less than 9,000 properties.  Gas safety has been included within the
annual assurance statement under section 5 of this report.   
4.13 The 2021 tenant survey found that 83.7% of tenants were satisfied with the
repairs service (indicator 12).  This was slightly below the Scottish average
and peer group average which were both 88%.   
Neighbourhood and Community 
4.14 The 2021 tenant survey found that satisfaction with the management of the
neighbourhood (indicator 13) at 89.6% was above the Scottish average of
85.1% and the peer group average of 83.1%.  This performance places the
Council in the upper quartile for local authorities. 
4.15 Applicants refused 27.2% of tenancy offers (indicator 14) which was better
than the Scottish average (32.9%) and peer group average (35.2%).  A low
refusal rate helps to minimise void periods and rent loss. 
4.16 In 2021/22, 74.4% of antisocial behaviour cases were resolved within local
target timescales (indicator 15) which is below than the Scottish average
(94.7%) and peer group average (90.5%). 
Access to Housing and Support
4.17 Tenancy sustainment (indicator 16), where tenancies lasted for more than 12
months, was slightly higher in Moray (91.9%) than the Scottish average
(90.8%) and peer group average (90.9%). 
Page 51

Page 52

4.18 The turnover of properties (indicator 17) in Moray (7.3%) was similar to the
Scottish average (7.8%) and peer group average (7.0%).   
4.19 The proportion of court actions resulting in eviction (indicator 22) in Moray
(50%) was higher than the Scottish average (21.9%) and peer group average
(13.0%).  This performance appears unusually high but is distorted by the low
numbers involved.  In 2021/22 just 2 court actions were initiated with 1
resulting in eviction.  The Housing Service only uses eviction as a last resort
where all efforts to engage with the tenant have been unsuccessful. 
Getting Good Value from Rents and Service Charges
4.20 The 2021 survey found that 86.4% of tenants feel their rent is good value for
money (indicator 25).  This is above the Scottish average (82.5%) and peer
group average (81.3%) and places the Council in the upper quartile for local
authorities. 
4.21 The Council collected 99% of the total rent due (indicator 26) which is similar
to the Scottish average of 99.3% and peer group average 100.1%.  This
indicator includes both current and former tenant arrears in the calculation.  At
3.8%, the Council had the lowest level of gross rent arrears (indicator 27) of
all local authorities.  The Scottish average was 6.3% and the peer group
average was 8.2%. 
4.22 The rent lost through properties being vacant (indicator 18) in Moray was
1.3%, which is better than the Scottish average of 1.4% and peer group
average of 1.5%.  The time to re-let empty properties reduced from 76 days in
2020/21 to 62 days in 2021/22 but remains higher than the Scottish average
(51 days) and peer group average (55 days).  This has also been noted within
the annual assurance statement under section 5.   
5. SCOTTISH SOCIAL HOUSING CHARTER COMPLIANCE 
5.1 The Scottish Housing Regulator (SHR) requires landlords to monitor progress
against the outcomes and standards of the Scottish Social Housing Charter. 
The Council’s Annual Return on the Charter (ARC) was submitted in May
2022.   
Annual Assurance Statement
5.2 Each year by 31 October, the SHR requires social landlords to submit a
statement to assure the regulator and tenants/service users that they are
meeting statutory and regulatory requirements.  The statement informs the
SHR’s risk assessment process and level of engagement with the landlord. 
The statement must: 
• confirm the landlord meets all of the relevant requirements set out in its
regulatory framework which can be found online at
www.housingregulator.gov.scot/for-landlords/regulatory-framework;
• set out any areas of material non-compliance and describe
improvement actions and timeframes for these;
• confirm that appropriate evidence has been considered to support the
level of assurance given by the governing body or Committee; and
• confirm the date of the meeting of the governing body or Committee. 
Page 52

Page 53

5.3 In reaching a decision about non-compliance, the Committee must decide
whether the issue is material.  The Committee should consider whether an
issue:
• seriously affects the interests and safety of tenants or other service
users; 
• threatens the stability, efficient running or viability of service delivery
arrangements; or
• brings the landlord into disrepute, or raises public or stakeholder
concern about the organisation or the social housing sector. 
5.4 On 21 June 2022, this Committee was informed that the Scottish Housing
Regulator (SHR) would publish the landlord reports and national results for all
social landlords on 31 August 2022.  On 21 June 2022, this Committee
granted delegated authority to the Head of Housing and Property Services to
submit the annual Assurance Statement on behalf of the Committee, following
a briefing for Members prior to the SHR’s deadline of 31 October 2022
(paragraph 10 of the Minute refers).   
5.5 In line with the guidance issued by the SHR on the content, the Assurance
Statement which can be found in APPENDIX III was considered by Elected
Members at a briefing on 26 October 2022.  This identified the areas where
the service is working towards compliance: 
• properties have been identified which fail to meet the Scottish Housing
Quality Standard as detailed in section 4.7;
• properties have been identified which fail to meet the Energy Efficiency
Standard as detailed in section 4.8; 
• some gas safety checks were not carried out within the 12 month
timeframe for properties as detailed in section 4.12;
• further improvement is needed in the time taken to re-let empty homes
as detailed in section 4.22; and
• the Housing Service is in the process of implementing recent guidance
published by the Scottish Federation of Housing Associations relating
to equalities.  The SHR has asked landlords to update them on the
stage they are at within this year’s statement. 
Annual Performance Report
5.6 Social landlords must produce an annual report on their performance for
tenants and other service users which details how they are achieving or
progressing towards the outcomes and standards of the Charter.  The SHR
expects the report to be developed in partnership with tenants and other
customers, rather than exclusively by the Council.  The format, content and
design of the report has been based on discussions with tenant
representatives and also from feedback forms from the previous year’s report. 
The report mirrors the key themes of the Charter and is available on the
Council’s website at: www.moray.gov.uk/moray_standard/page_101335.html. 
The report has been publicised through the Tenants’ Voice newsletter and
through the Moray Council Tenants Facebook group.  As has been the case
in previous years, paper copies are issued to tenants on request.   
Page 53

Page 54

6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Moray Council’s Corporate Plan 2019-24 aims to empower local
communities by understanding what they need and building their
capacity to work with the Council and other partners to deliver and
improve services and outcomes for people.  This priority is reflected
within the Housing and Property Service Plan. 
(b) Policy and Legal
Reporting on Scottish Social Housing Charter performance indicators is
a legal requirement under the Housing (Scotland) Act 2010.   
(c) Financial implications
Any costs associated with implementing improvements will be met from
within existing budgets. 
(d) Risk Implications
The annual assurance statement and annual performance report are
requirements under the Scottish Housing Regulator’s regulatory
framework.  In addition tenants and service users must be provided with
meaningful opportunities to participate in the management of their
homes and decision making processes.  Failure to meet these
requirements presents a regulatory risk. 
(e) Staffing Implications
There are no staffing implications associated with this report. 
(f) Property
There are no property implications associated with this report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications directly arising from this report.  The
Housing Service is working towards compliance on recently published
guidance from the Scottish Federation of Housing Associations relating
to equalities. 
(h) Climate Change and Biodiversity Impacts
The service delivery aims of the Housing Service are closely aligned to
the Council’s Climate Change Strategy, and Local Heat and Energy
Efficiency Strategy (LHEES). 
(i) Consultations
Consultation on this report has been carried out with the Head of
Housing and Property, senior managers within the Housing and
Property service, Senior Solicitor (Georgina Anderson), Research and
Information Officer (Christopher Dewhurst), the Equal Opportunities
Officer and Committee Services Officer (Lindsey Robinson).  Their
comments, where relevant to their areas of responsibility, have been
incorporated in this report. 
Page 54

Page 55

7. CONCLUSION 
7.1 This report provides the Committee with an update on the Council’s
performance and compliance with the Scottish Social Housing Charter. 
Author of Report: Daska Murray, Senior Housing Officer (Information)
Background Papers: With author
Ref: SPMAN-1285234812-1189
Page 55

Page 56

Page 56

Page 57

APPENDIX I
ARC
Indicator
Number
Description Moray
2021/22
Scottish
Average
2021/22
Local
Authority
Average
2021/22
OVERALL SATISFACTION
1 Percentage of tenants satisfied with the overall service provided by their
landlord 82.8 87.7 82.2 83.1
THE CUSTOMER/LANDLORD RELATIONSHIP
2 Percentage of tenants who feel their landlord is good at keeping them
informed about their services and decisions 91.3 91.2 84.7 86.5
3&4 The average time in working days for a full response
1st stage (5 working days) 5 6 6 7
2nd stage (20 working days) 22 27 34 24
5 Percentage of tenants satisfied with the opportunities given to them to
participate in their landlord's decision making processes 96.2 86.8 78.7 80.3
HOUSING QUALITY AND MAINTENANCE
6 Percentage of stock meeting the Scottish Housing Quality Standard (SHQS)
6.3 74.6 64.0 67.3
C10 Percentage of properties meeting the Energy Efficiency Standard for Social
Housing (EESSH) 60.4 83.1 80.9 83.2
7 Percentage of existing tenants satisfied with the quality of their home 82.7 85.4 80.7 82.4
8 Average length of time taken to complete emergency repairs (hours) 3.1 4.2 5.1 5.0
9 Average length of time taken to complete non-emergency repairs (working
days) 8 9 9 9
10 Percentage of reactive repairs carried out in the last year completed right
first time 85.5 88.3 86.4 86.1
11 No. of times you did not meet your statutory duty to complete a gas safety
check 4 78 72 33
12 Percentage of tenants who have had repairs or maintenance carried out in
last 12 months satisfied with the repairs and maintenance service 83.7 88.0 86.8 88.0
NEIGHBOURHOOD AND COMMUNITY
13 Percentage of tenants satisfied with the landlord's contribution to the
management of the neighbourhood they live in 89.6 85.1 80.9 83.1
14 Percentage of tenancy offers refused during the year 27.2 32.9 36.6 35.2
15 Percentage of anti-social behaviour cases reported in the last year which
were resolved 74.4 94.7 90.1 90.5
ACCESS TO HOUSING AND SUPPORT
16 Percentage of new tenancies sustained for more than a year (all sources)
91.9 90.8 91.1 90.9
17 Percentage of lettable houses that became vacant in the last year 7.3 7.8 7.0 7.0
22 Percentage of court actions initiated which resulted in eviction 50.0 21.9 31.1 13.0
24 Percentage of referrals under Section 5 and other referral routes 21.5 27.4 30.4 16.2
GETTING GOOD VALUE FROM RENTS AND SERVICE CHARGES
18 Percentage of rent due lost through properties being empty during the last
year 1.3 1.4 1.4 1.5
25 Percentage of tenants who feel that the rent for their property represents
good value for money 86.4 82.5 80.8 81.3
26 Rent collected as percentage of total rent due in the reporting year 99.0 99.3 98.7 100.1
27 Gross rent arrears as a percentage of rent due for the reporting year 3.8 6.3 8.4 8.2
30 Average length of time taken to re-let properties in the last year (calendar
days) 62 52 62 55
same as or better than the peer group average
within 5% of the peer group average
more than 5% below the peer group average
SHN Peer
Group
Average
2021/22
Item 9.
Page 57

Page 58

Page 58

Page 59

APPENDIX II 
1
Housing and Property Tenant Survey Improvement Plan 
2022-24 
Status Update Report – September 2022 
Action Complete 
Improvement Area – Repairs 
Outcome – Repairs are delivered on time and repair appointments kept 
Improvement Actions Measures Target Completion Lead Reporting Progress 
Meet target timescales for repairs 
Review target across all repairs categories
Repairs met
within target
time 
Review complete
March 2023 and annual 
March 2023
Housing Asset
Manager/Building
Services DLO
Manager 
Housing Asset
Manager/Building
Services DLO
Manager/Repairs
Working Group
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee Performance
Report; Tenants Voice 
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee Performance
Report; Tenants Voice
Target timescales for all ARC repairs
categories achieved in 2021/22.  ARC
indicator closely monitored as part of
Housing performance framework. 
Consideration given to aligning Council’s
targets with other social landlords. Revised
project plan aims to consult with tenants and
representatives in early 2023.  A report on
the findings will be submitted to this
Committee in early2023 with implementation
planned during 2023/24.
Review repairs processes and implement
improvement plan 
Review complete  March 2023 and ongoing Housing Asset
Manager/Building
Services DLO
Manager/Repairs
Working Group
Housing & Property
Management Team
Repairs Working Group reviewing processes
to identify improvements. A number of
improvements have identified that include
changing repair scripts, reconfiguring DRS
system (repair scheduling) and additional
staff training. These are being progressed
during 2022/23. 
Item 9.
Page 59

Page 60

APPENDIX II 
2
Improvement Actions Measures Target Completion Lead Reporting Progress
Review ICT systems used by DLO to
identify improvements in appointments 
Review complete 
Repairs
appointments
kept 
March 2023 and ongoing 
31 March 2023 and annual
Building Services
DLO Manager 
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee Performance
Report; Tenants Voice
ICT are currently reviewing repairs ICT
systems to ensure that they are fit for
purpose, being used to full capacity and are
sustainable. This review will be complete by
March 2023. 
Annual performance for 2021/22 on keeping
appointments was 100%. 
Improve approach to measuring tenant
satisfaction with repairs service
Increase
feedback
response rate to
30%
March 2023 and ongoing  Building Services
DLO Manager 
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee Performance
Report; Tenants Voice
Response rate for 2021 tenant survey was
39% which exceeds acceptable levels of
customer feedback for inclusion in ARC
submissions. 
Implement best practice solutions to
improving repairs service, learning from
high performing local authorities
Tenants 
satisfied with
the repairs
service exceeds
local authority
average 
Officer
participation in
best practice
groups on
repairs and
maintenance. 
March 2023 and ongoing  Building Services
DLO Manager 
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee Performance
Report; Tenants Voice; 
Tenant Survey2021 
2021/22
local authority average – 87%
Moray – 84% (source 2021 tenant survey) 
Council continues to be member of SHN and
APSE to access best practice guidance from
social landlords and peer groups. 
Page 60

Page 61

APPENDIX II 
3
Improvement Area – Housing Stock Condition 
Outcome – Tenants live in better quality and more energy efficient homes 
Improvement Actions Measures Target Completion Lead Reporting Progress
Deliver programme of energy efficiency
improvements to Council houses,
including heating and insulation 
Make improvements to housing
management system in relation to asset
management module 
All Council
houses EESSH1
compliant by
December 2020 
Programme in
place for
EESSH2 
Implement Asset
Management
Module 
Dec 2024 
March 2023 and annual 
March 2023
Housing Asset
Manager 
Housing Asset
Manager 
Housing Asset
Manager 
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee; Tenants Voice;
Moray Tenants Forum 
At 31 March 2022, 60% of the Council’s
properties were EESSH compliant, below the
target of 67%.  Substantial increase in funding
allocated to programme in 2020/21 and
2021/22 but delivery has been delayed by
Covid, shortage of materials and labour. 
Completed Stock Condition Survey being used
to identify programmes of works to meet
EESSH1 and EESSH2 standards.  Prime focus
on ensuring the poorest performing properties
are improved first.  Due to delays target date
amended. 
Project plan due to commence on 15
November with ICT supplier and key
stakeholders. 
Tenants’ priorities taken into account in
identifying details of planned maintenance
programme 
All Council
houses meet
SHQS 
Satisfaction
with quality of
the home
exceeds local
authority
average 
March 2023 and annual 
March 2023 and annual 
Housing Asset
Manager 
Housing Asset
Manager
Tenants Voice; Moray
Tenant Forum; Housing and
Community Safety
Committee; Annual Return
on Charter (ARC); Annual
Performance Report 
Tenants Survey 2021;
Tenants Voice; Housing and
Community Safety
Committee; Annual Return
on Charter (ARC); Annual
Performance Report 
Housing investment programmes reflect tenant
survey priorities of energy efficiency, including
heating and insulation improvements, and
kitchen and window upgrades.  Annual
Performance Report to tenants provides
information on how the Council has addressed
their investment priorities in the delivery of
planned maintenance programme. 
2021/22
local authority average – 81%  
Moray – 83%
Consultation with tenants on priorities for
future investment programme and Council’s
proposals in response to the SCS findings to
formed part of the 2021 Tenant Survey. 
Details of the planned maintenance
programme and progress on delivery reported
in the Tenants Voice/Annual Performance
Report/online.
Page 61

Page 62

APPENDIX II 
4
Improvement Actions Measures Target Completion Lead Reporting Progress
Carry out Best Value review of Housing
Maintenance Partnership on service and
costs in conjunction with review of the
Housing Revenue Account Business Plan
Review
complete
December 2022 Housing Asset
Manager
Housing and Community
Safety Committee
Implementation of a 5 year Housing
Maintenance Partnership that provides best
value for the council and its tenants.  Initial
review continuing still intend on completing by
31 December 2022.    
Improvement Area – Communication and customer service 
Outcome - Tenants receive a better response to service requests and enquiries 
Improvement Actions Measures Target Completion Lead Reporting Progress
Introduce tenant liaison officers within
Capital Programmes Team/DLO as part of
Change Management Plan 
CMP
Implemented 
March 2023  Housing Asset
Manager/Building
Services DLO
Manager 
Housing and Community
Safety Committee; Tenants
Voice; Moray Tenant Forum 
Following implementation of Change
Management Plan Capital Programmes Team
now changed to Housing Asset Management
Team.  Approval for this post was gained at the
Housing and Community Safety Committee in
September 2022 and post is currently
progressing through internall processes prior to
advertising.
Implement revised housing management
structure and performance framework to
improve level of service to tenants
New structure
and performance
framework
implemented
December 2023 Housing Services
Manager
Housing and Community
Safety Committee; Tenants
Voice; Moray Tenant Forum 
Revised structure for Housing Management
agreed with additional staff being recruited
including an additional Area Housing Manager
and 3.5 FTE Area Housing Officers.  Training
programme being arranged for new and
existing staff.  Performance framework has
been developed. Implementation scheduled for
January 2023.      
Page 62

Page 63

APPENDIX II 
5
Improvement Area – Rents and affordability 
Outcome - Tenants can afford to pay their rents and heat their homes 
Improvement Actions Measures Target Completion Lead Reporting Progress
Consult with tenants on annual rent
increase 
Rent levels
2023/24 
March 2023 and annual  Head of Housing
& Property 
Tenants Voice; Moray
Tenant Forum; Housing and
Community Safety
Committee; Tenant Rent
Consultation; Full Council
Revising schedule for 2023/24 rent
consultation following recent emergency
legislation, noting this will be provisional
depending on Scottish Government decision on
limiting increases.  
Consult with tenants on review of rent
setting policy
Review complete July 2023 Head of Housing
& Property
Tenants Voice; Moray
Tenants Forum; Housing
and Community Safety
Committee; Tenant Rent
Consultation; Full Council
Work has commenced on this review. The
Council’s consultants have presented modelled
scenarios of options to be considered by
officers, before presenting a final approach to
tenants in 2023.  
Reduce tenants heating costs by making
Council houses more energy efficient 
Council houses
EESSH
compliant 
Fewer than 35%
of tenants
consider they
are at risk of
fuel poverty 
Dec 2020 
March 2022 
Housing Asset
Manager
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee Performance
Report; Tenants Voice; LHS 
Tenant Survey 2021
Dec 2020 target set by Scottish Government
has not been achieved.  This is a key
improvement priority for the Housing Service
during 2023/24 and beyond. 
Over 700 new build properties built since 2011
with high levels of energy efficiency. 
22% in 2021 survey stated in the last 12
months they have wanted to put their heating
on but chosen not to because they could not
afford to.  However, the survey was carried out
prior to the increase in energy costs might
have on their household and therefore position
may have changed.   
Page 63

Page 64

APPENDIX II 
6
Improvement Area – Tenant Participation 
Outcome - Tenants have greater opportunities to engage with their landlord on service development and decision-making. 
Improvement Actions Measures Target Completion Lead Reporting Progress
Consult and involve stakeholders in a
review of the Tenant Participation
Strategy, incorporating actions identified
within the Scottish Government’s Next
Steps Programme to identify areas for
improving tenant participation
opportunities and engagement levels
Review complete 
Tenants 
satisfied with
the options to
participate in
decision making
exceeds local
authority
average 
June 2023 
March 2023 and annual
Housing Strategy
& Development
Manager
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee; Moray Tenants
Forum; Tenants’ Voice;
Tenant Participation
Strategy
Progress is dependent on the recruitment of
a Customer Engagement Officer approved by
Housing and Community Safety Committee in
June 2022.  Job evaluation processes
pending. 
2021/22 
local authority average – 79%
Moray - 96%
Development and commencement of PB
approach
Participatory
budgeting
implemented in
housing services
March 2023 and ongoing  Head of Housing
& Property
Housing and Community
Safety Committee; Tenant
Participation Strategy
Progress is dependent on the recruitment of
a Customer Engagement Officer approved by
Housing and Community Safety Committee in
June 2022.  Job evaluation processes
pending.
Implement best practice solutions to
improve participation, learning from high
performing local authorities and
Registered Social Landlords (RSLs)
Officer
participation in
best practice
groups 
March 2023 and ongoing Housing Strategy
& Development
Manager
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee; Tenants Voice;
Moray Tenant Forum;
Tenant Participation
Strategy
Officers attend SHN and TPAS meetings and
ongoing membership of North East Tenant,
Residents and Landlords Together (NETRALT)
and Northern Tenant Partnership (including
Moray and Highlands), formerly the Moray
Tenants Partnership. 
Progress is dependent on the recruitment of
a Customer Engagement Officer approved by
Housing and Community Safety Committee in
June 2022.  Job evaluation processes
pending.
Page 64

Page 65

APPENDIX II 
7
Improvement Area – Neighbourhood Management 
Outcome - Tenants are satisfied with quality and management of their neighbourhoods in relation to issues of litter, parking and
traffic management, landscape maintenance, play areas for children, crime and antisocial behaviour.  
Improvement Actions Measures Target Completion Lead Reporting Progress
Develop new ways of working with tenant
and resident groups, other Council
services and partners to address local
neighbourhood issues 
Tenants satisfied
with the
landlord's
contribution to
management of
neighbourhood
exceeds local
authority
average
March 2023 and ongoing  Housing Services
Manager 
Annual Return on Charter
(ARC); Annual Performance
Report; Housing and
Community Safety
Committee; Tenants Voice;
Moray Tenant Forum;
Tenant Survey 2021 
Progress is dependent on the recruitment of
a Customer Engagement Officer approved by
Housing and Community Safety Committee in
June 2022.  Job evaluation processes
pending. 
2021/22
local authority average – 81%
Moray – 90% 
Fund grass-cutting within Council estates Annual
maintenance
programme
agreed
March 2023 and annual  Housing Asset
Manager
Full Council; Housing and
Community Safety
Committee; Moray Tenant
Forum
Funding being provided from HRA.  Future
maintenance of HRA ground currently being
reviewed with Open Space Services to ensure
General Fund receives appropriate payment
for work undertaken and ensure service
delivery to HRA tenants.
The Estates Budget for environmental
improvements within neighbourhoods to
be included as part of the Council’s
Participatory Budget arrangements
Participatory
Budget agreed
March 2023 and annual Head of Housing
and Property
Full Council; Housing and
Community Safety
Committee; Moray Tenant
Forum 
Progress is dependent on the recruitment of
a Customer Engagement Officer approved by
Housing and Community Safety Committee in
June 2022.  Job evaluation processes
pending. 
Annual estate walkabouts to commence
during 2023 once Housing Asset
Management tenant liaison officer is in post. 
Page 65

Page 66

Page 66

Page 67

APPENDIX III
Page 1 of 3 
Moray Council Housing and Property Service
Assurance Statement 
We comply with the regulatory requirements set out in Chapter 3 of the Scottish Housing
Regulator’s Regulatory Framework with the exception of the areas set out below. 
We achieve all but the following outcomes and standards in the Scottish Social Housing
Charter: 
• Outcome 1 - Equalities 
We are working towards compliance in relation to the recently published SFHA guidance on
equalities.  We are in the process of implementing an effective approach to the collection of
equalities information.  However, we routinely complete Equalities Impact Assessments on
all of our strategies, policies and plans which form an integral part of our decision making
process. 
Moray Council has initiated work on development of improved equalities and human rights
outcomes as part of the Local Outcome Improvement Plan, Corporate Plan and its Equality
Outcomes.  Progress on the Equality Outcomes are now reported through the Council’s
performance reporting framework.  This will improve mainstreaming of response to
equalities and human rights issues throughout the Council.   
• Outcome 4 – Quality of Housing 
Scottish Housing Quality Standard (SHQS)
At 31 March 2022, 4,653 of our 6,297 properties did not meet the SHQS.  An additional 1,003
properties were classed as exempt and 242 properties were in abeyance.  The main areas of
non-compliance are:
• Energy Efficiency Standard for Social Housing (EESSH);
• Fire Safety; and
• Electrical Safety. 
Our Housing Investment Programme was significantly delayed due to the pandemic but we
have approved a 30 year plan which will allow us to make improvements to our housing
stock.  This will be supported by the implementation of an asset management module for our
housing management system within the next 18-24 months to improve compliance
monitoring and make better informed investment decisions.  In addition, we have reviewed
our Asset Management Team structure and are recruiting additional officers to manage the
projects and target future works to ensure compliance with legislation. 
Item 9.
Page 67

Page 68

APPENDIX III
Page 2 of 3
Energy Efficiency Standard for Social Housing (EESSH)
At 31 March 2022, we reported that 1,399 of our 6,297 properties do not meet the EESSH,
reduced by 560 properties from March 2021.    We continue to focus on a range of energy
efficiency upgrades including installation of more efficient/renewable heating systems.  Our
business plan provides for a significant expansion of this in the period ahead, subject to
market conditions, with over 500 properties due to benefit from this in 2022/23. 
Fire Safety
At 31 March 2022, 862 properties did not meet the updated fire safety regulations.  The main
reasons for the delay are access issues and the need for building warrants for certain types
of properties.    We are actively working to gain access to each of the remaining properties. 
At 30 September 2022, this had reduced to 324 properties.  A programme is in place which
aims to complete the remaining upgrades by the end of the reporting year. 
Electrical Safety 
At 31 March 2022, 5,413 properties did not have a valid Electrical Installation Condition
Report (EICR) although some of these were in abeyance.  Housing Investment works over
the past decade or so involved key elements of electrical upgrade work as part of
planned/cyclical maintenance programmes.  However, this work was recorded on partial
electrical certificates rather than full EICRs, meaning that most of our properties are slightly
below the required standard.  We have set aside additional investment to ensure the non-
compliant properties are inspected to the required standard by 31 March 2024.   
• Outcome 13 – Value for Money 
Void Management
Our average re-let time reduced by 13 days in 2021/22 to 62 days.  Labour resources and
utility company issues have both been a factor in our overall performance.  Our void working
group continue to review processes with a view to minimise the time our properties are
empty.  Whilst we are encouraged that our recovery efforts following the pandemic have
brought us closer to the local authority average, we have a plan in place to deliver further
improvements.  Our focus remains on achieving our ambitious target of 32 days.   
We comply with all relevant legislative duties, including our legal obligations relating to housing
and homelessness, equality and human rights, and tenant and resident safety with the
exception of: 
Gas safety
In 2021/22 we did not meet our statutory duty to complete a gas safety check within the required
timescale for 4 properties but this was rectified at the earliest opportunity and all are now
compliant.  The reasons for the checks not being carried out on time related to the pandemic:  
No of failures Reason
3 Tenant/household member with Covid symptoms so safety check/forced
entry was postponed.
1 Covid restrictions prevented tenant from returning home from another
country.  Forced entry was carried out late and meter was capped.   
Page 68

Page 69

APPENDIX III
Page 3 of 3
We confirm that we have seen and considered appropriate evidence to give us this assurance. 
We approved our Assurance Statement on 26 October 2022 and sign this statement on behalf
of the Housing and Community Safety Committee. 
Councillor Amber Dunbar     Councillor Donald Gatt
Chair of Housing and Community Safety Depute Chair of Housing and Community Safety
Page 69

Page 70

Page 70

Page 71

REPORT TO: HOUSING AND COMMUNITY SAFETY COMMITTEE ON 15
NOVEMBER 2022 
SUBJECT: STRATEGIC HOUSING INVESTMENT PLAN (SHIP) 2023/2024 -
2027/2028 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask the Committee to approve the Council’s draft Strategic Housing
Investment Plan (SHIP) 2023/2024 - 2027/2028. 
1.2 This report is submitted to Committee in terms of Section III G (10) Council’s
Scheme of Administration relating to the preparation and implementation of
strategic housing plans. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
i) considers and comments on the draft SHIP; 
ii) approves the consultative draft SHIP submitted to the Scottish
Government on 21 October 2022; and 
iii) agrees that further progress reports on the SHIP are presented to
this Committee as required. 
3. BACKGROUND 
3.1 The Council has submitted its SHIP to Scottish Government annually since
2007.  The SHIP sets out the Council’s priorities for investment in affordable
housing to meet the housing supply targets and outcomes stated in the Local
Housing Strategy (LHS).  In setting local investment priorities, the SHIP is
intended to guide the allocation of resources available for affordable housing
in Moray.  At a detailed level, the SHIP identifies the housing projects that the
Council considers are priorities for inclusion in the Moray Affordable Housing
Programme. 
Item 10.
Page 71

Page 72

3.2 On 19 October 2021, the Committee approved the Council’s current SHIP
(2022/2023-2026/27) for submission to the Scottish Government (paragraph 5
of the Minute refers). 
3.3 SHIPs are the key documents for identifying the strategic housing projects
that will contribute to the achievement of national housing supply targets.  The
Scottish Government provides local authorities with guidance for preparing
their SHIPs, and has provided substantially increased resources to fund local
affordable housing programmes to contribute to the aims and targets detailed
in Housing to 2040.  Details of the resources being made available for the
Moray programme are provided at Paragraph 4.12 of this report. 
4. THE MORAY SHIP 2023/2024 - 2027/2028 
4.1 The consultative draft SHIP submission is available on the Council’s website
at http://www.moray.gov.uk/moray_standard/page_95565.html. 
4.2 In summary, the SHIP: 
• sets out the Council’s strategic investment priorities for affordable
housing;  
• demonstrates how these outcomes will be delivered;  
• identifies the resources required to deliver the investment priorities;  
• enables the involvement of key local stakeholders in the development and
implementation of proposals; and  
• prioritises projects for inclusion in the Moray Affordable Housing
Programme (Table 1 of the SHIP).   
4.3 For the first time, the SHIP includes details of affordable housing completions
over the last 5 years, disaggregated by location, and house size and type.   
4.4 The investment priorities set out in the SHIP have been developed to fit with
the Local Housing Strategy 2019-24, as approved by Communities Committee
on 2 April 2019 (Paragraph 8 of the Minute refers). 
4.5 Delivery of the affordable housing programme has been affected by issues
affecting the construction industry at a national level, in terms of supply chain
disruption, volatile materials pricing and workforce shortages, as well as
COVID-19 safe operating procedures. 
4.6 In terms of geographical priorities, the SHIP seeks to allocate investment to
areas where the demand for affordable housing is greatest.  Accordingly, a
significant proportion of funding has been directed to the Elgin Housing
Market Area.  The high priority projects for this area are Bilbohall; Findrassie;
several character areas in Elgin South; Garmouth Road, Lhanbryde and
Kinneddar Meadows, Lossiemouth.  However, with high levels of demand
across Moray, the SHIP seeks to apportion provision across all housing
market areas in accordance with the number of households wherever possible
i.e. in the Buckie, Forres, Keith and Speyside Housing Market Areas.  The
high priority projects for these areas are Banff Road, Keith; Ferrylea and
Knockomie, Forres; Speyview, Aberlour. 
Page 72

Page 73

4.7 A key consideration in the SHIP’s approach to programme prioritisation has
been the availability and deliverability of development opportunities.  With
most of Moray’s housing land in private ownership, the programme continues
to be largely dependent on affordable housing obligations required by
planning policy, currently set at 25%.  This means that the phasing of much of
the SHIP programme is driven by the timescales of landowners and private
developers for the delivery of affordable housing obligations.  Consequently,
any change in the plans of private developers could impact adversely on the
delivery of the SHIP programme with impacts greater for major sites with large
obligations, e.g. Findrassie, Elgin South, and Kinneddar Meadows,
Lossiemouth. 
4.8 The land banking of affordable housing sites provides a valuable resource for
planning affordable housing provision and helps reduce the programming
uncertainties associated with developer driven opportunities.   The SHIP
includes provision for the advance purchase of the former Spynie Hospital
site.  The land for developments proposed at Banff Road, Keith and Bilbohall,
Elgin, are already in the ownership of either the Council or Grampian Housing
Association. 
4.9 The LHS aims to meet the needs of households in need of specialist housing,
especially older people, wheelchair users and people with learning disabilities. 
The SHIP makes provision for approximately 30% of units to be delivered in
the form of amenity bungalows and wheelchair accessible bungalows in the
vast majority of the developments listed.  The SHIP makes provision for
housing with specialist support for people with learning disabilities at
Garmouth Road, Lhanbryde; Bilbohall and Pinegrove, Elgin. 
4.10 The approach to the size and type of properties that will be funded is set out in
Section 3 of the draft SHIP and is unchanged from the previous year. 
4.11 The LHS Affordable Housing Supply Target includes a target of approximately
12% of affordable units met as intermediate tenure.  Intermediate tenure
housing aims to provide an opportunity for low income households to
purchase a home, or an equity share in a home, or which aims to provide
affordable rented accommodation to households in lower priority need
categories on Housing Lists.  The proposals at Findrassie, Elgin; Ferrylea,
Forres and Banff Road, Keith include intermediate tenures (mid-market rent
and/or shared equity) to promote tenure diversification.   
4.12 On 15 July 2021, the Scottish Government provided the Council with a
Resource Planning Assumption (RPA) of £46.2m for 2021/22 to 2025/26.   
Year 2021/22 2022/23 2023/24 2024/25 2025/26 Total
Moray £10.357m £8.927m £8.902m £8.933m £9.981m £46.200m 
In accordance with the Scottish Government’s recommendations, the SHIP
includes a minimum slippage factor of 25% to compensate for programme
delays, or to bring projects forward should additional resources become
available. 
4.13 In line with the current Council’s Housing Revenue Account Business Plan
assumptions, the programme set out in the SHIP will support the delivery of
Page 73

Page 74

50 council houses per annum.  A Business Plan review was completed in
February 2022.  The Council’s development programme has been tailored to
fit the revised Business Plan and the RPA, using this SHIP as a framework for
prioritisation of resources.  At 50 units per year, the Council’s programme will
not be sufficient to maximise use of available grant funding (see Para 4.11
above).  The balance of the Moray programme must be delivered by RSL
partners.  However the level of available grant per property, and volume of
opportunities has resulted in RSL partners reporting that their own capacity for
borrowing to invest has been maximised in this SHIP.  This means that a few
projects listed in SHIP Table 1 do not have an identified RSL at this stage.  In
turn, this means that some developments may be delayed and the Scottish
Government’s delivery targets may not be met. 
4.14 The SHIP provides details of other sources of funding that can be used to
support the Moray programme, including Council Tax levy on empty homes
totalling around £600k per annum, and commuted payments in lieu of
affordable housing as required by planning policy.  Whilst it is likely that
income from commuted payments will continue to remain comparatively low, it
could be used to support project viability, particularly in rural areas where
economies of scale are reduced, and development costs can be higher. The
approach to seeking commuted payments is set out in Section 8 of the draft
SHIP. 
4.15 The SHIP has been developed through a collaborative process involving
primarily the Scottish Government, partner RSLs and local housing
developers but also other Council services, particularly Planning colleagues
and Health and Social Care Moray. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) identifies an increase in the supply of affordable housing as one
of the key components of a growing, diverse and sustainable economy in
Moray.  The SHIP reflects priorities for investment in the provision of new
affordable housing to meet need identified in the Local Housing Strategy. 
(b) Policy and Legal  
The production of the Council’s SHIP helps the Council to meet statutory
duties in respect of addressing housing need in Moray.   
(c) Financial implications
There are no direct financial implications to the Council arising from this
report. The SHIP provides details of the resources available to fund the
supply of affordable housing in Moray.    
(d) Risk Implications
The major risks to the delivery of the Moray affordable housing
programme have been assessed as part of the development of the
SHIP.  The SHIP provides high level details of proposed future
investment in Council house building.  The financial risks of funding the
Council’s programme has been assessed as part of the review of the
Page 74

Page 75

Housing Business Plan completed in Feb 2022, however given the
significant economic impact in the aftermath of the subsequent invasion
of Ukraine, affordability is being kept under review and the potential for
projects not to proceed is greater. 
(e) Staffing Implications  
There are no staffing implications arising from this report.    
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact 
The housing needs of equalities groups are identified in the LHS.  The
LHS is subject to an Equalities Impact Assessment.  The Moray
Affordable Housing Programme seeks to deliver the housing priorities
contained in the LHS. 
(h) Climate Change and Biodiversity Impacts
The aims of this SHIP are closely aligned to the Council’s Climate
Change Strategy, and Local Heat and Energy Efficiency Strategy
(LHEES).  
(i)  Consultations 
This report has been subject to consultation with the Depute Chief
Executive (Economy, Environment and Finance), the Head of Housing
and Property, the Head of Economic Growth and Development, Strategic
Planning and Development Manager, the Head of Community Care, the
Chief Officer (Health and Social Care Moray), the Chief Financial Officer,
the Principal Climate Change Strategy Officer, Georgina Anderson
(Senior Solicitor), the Housing Needs Manager, the Housing Services
Manager and the Committee Services Officer.   
6. CONCLUSION 
6.1 This report provides the Committee with details of the Council’s
consultative draft SHIP 2023/2024 - 2027/2028 as submitted to the
Scottish Government, in accordance with SHIP Guidance.  The
Committee is asked to consider and comment on the draft SHIP. 
Author of Report: Fiona Geddes, Acting Housing Strategy and Development
Manager
Background Papers: http://www.moray.gov.uk/moray_standard/page_95565.htm
Ref: SPMAN-1285234812-1187 
Page 75

Page 76

Page 76