Housing and Community Safety Committee 
Tuesday, 09 September 2025 
NOTICE IS HEREBY GIVEN that a Meeting of the Housing and Community Safety
Committee is to be held at Council Chambers, Council Office, High Street, Elgin,
IV30 1BX on Tuesday, 09 September 2025 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government (Scotland)
Act 1973, as amended, the public and media representatives be excluded
from the meeting for Items 11 and 12 of business on the grounds that it
involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.”   
4. Minute of meeting of 24 June 2025 7 - 12
5. Written Questions ** 
6. Housing and Property Services Budget Monitoring Report to
30 June 2025
Report by Executive Director for Education, Housing and Communities  
13 - 22
7. Consultative Draft Local Housing Strategy 2025-2030
Report by Executive Director for Education, Housing and Communities  
23 - 34
Page 1

Page 2

8. Rent Arrears Policy Review
Report by Executive Director for Education, Housing and Communities  
35 - 58
9. Scottish Social Housing Charter Compliance
Report by Executive Director for Education, Housing and Communities  
59 - 66
10. Moray Home Energy Efficiency Programme
Report by Executive Director for Education, Housing and Communities  
67 - 74 
Item(s) which the Committee may wish to consider with the
Press and Public excluded   
11. Building Services Budget 2025-26 - Budget Monitoring [Para
9]
• 9. Information on terms proposed or to be proposed by or to the
Authority; 
12. Report on Tender - Speyview Aberlour Phase 2 [Paras 6 and
9]
• 6. Information relating to the financial or business affairs of any
particular person(s);
• 9. Information on terms proposed or to be proposed by or to the
Authority; 
Summary of the Housing and Community Safety Committee
functions:
To deal with matters relating to Housing/HMOs, Housing Regeneration,
Homelessness, Social Inclusion, Equalities, Community Safety, Anti-
Social Behaviour (including road accidents) and Community Liaison.     
Page 2

Page 3

Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 4

Page 5

MORAY COUNCIL 
Housing and Community Safety Committee 
SEDERUNT 
Councillor Amber Dunbar  (Chair)
Councillor Paul McBain  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor John Divers  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor Donald Gatt  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Marc Macrae  (Member)
Councillor Shona Morrison  (Member)
Councillor Derek Ross  (Member)
Councillor John Stuart  (Member)  
Ms Alison Angus  (Non-Voting Member)
Ms Beverley Davenport  (Non-Voting Member)
Ms Elizabeth McKnockiter  (Non-Voting Member)
Clerk Name: Lissa Rowan
Clerk Telephone: 07765 741754
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Housing and Community Safety Committee 
Tuesday, 24 June 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Neil Cameron, Councillor Tracy Colyer, Ms Beverley
Davenport, Councillor John Divers, Councillor Amber Dunbar, Councillor Jérémie
Fernandes, Councillor Donald Gatt, Councillor David Gordon, Councillor Juli Harris,
Councillor Sandy Keith, Councillor Marc Macrae, Councillor Paul McBain, Ms Elizabeth
McKnockiter, Councillor Shona Morrison, Councillor Derek Ross, Councillor John Stuart 
APOLOGIES 
Ms Alison Angus 
IN ATTENDANCE 
Depute Chief Executive (Economy, Environment and Finance); Head of Housing and
Property Services; Housing Strategy and Development Manager; Housing Services
Manager; Lead Public Health Officer, Moray Council; Housing Needs Manager; Senior
Housing Officer (Strategy); DLO Manager; Georgina Anderson, Senior Solicitor and
Caroline O'Connor, Committee Services Officer.  
ALSO IN ATTENDANCE
Councillor Peter Bloomfield 
1.         Chair 
The meeting was chaired by Councillor Amber Dunbar.  
2.         Commendations 
The Committee joined the Chair in congratulating two of the Council's apprentice
plumbers on their success at the recent Scottish Plumbing Apprentice of the Year
competition. 
On behalf of the Committee, the DLO Manager presented commendation to second
year apprentice plumber Sweyn MacAskill and his supervisor Ewen Kennedy for
achieving third place in the 2025 Scottish Apprentice of the Year leadwork category.
Commendation was also presented to third year plumbing apprentice Frazer Graham
and his supervisor Stuart Gauld for achieving first place in the same Scottish
Apprentice of the Year leadwork category.  
3.         Congratulations 
Item 4.
Page 7

Page 8

The Committee joined the Chair in congratulating Ms McKnockiter, Tenant
Representative on winning the Alan Ferguson Tenant of the Year prize at the recent
Tenant Participatory Advisory Service Scotland Conference recognising her
inspiration and motivation in her role as chair of the tenant form.  
4.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 of the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.  
5.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for Item 15 of business on the grounds that it involves the likely
disclosure of exempt information of the class described in the relevant Paragraphs of
Part 1 of Schedule 7A of the Act.  
Para Number of the
Minute Para Number of Schedule 7a
17
Para 9
Information on terms proposed or to be proposed by or to the
Authority. 
6.         Minute of meeting of 6 May 2025 
The minute of the meeting of the Housing and Community Safety Committee dated 6
May 2025 was submitted and approved.  
7.         Written Questions ** 
The Committee noted that no written questions had been submitted.   
8.         Moray Affordable Housing Investment Programme 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing Committee of progress on the Affordable
Housing Investment Programme in Moray.  
In introducing the report, the Housing Strategy and Development Manager apologised
for an error in paragraph 8.5 where 2024/25 should read 2025/26. 
Following consideration the Committee unanimously agreed to:-  
(i) note the resource planning assumption received from the Scottish Government
and its implications for the development programme; 
(ii) note progress on the Moray Affordable Housing Investment Programme; 
Page 8

Page 9

(iii) note progress on delivery of housing at Bilbohall; and 
(iv) note progress on the delivery of the Council's new build and acquisition
programme.  
9.         Consultative Draft Local Housing Strategy 2025-2030 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing an update on the development of the draft Local
Housing Strategy 2025-2030.  
Following consideration the Committee unanimously agreed to:-  
(i) note the approach to development of the Local Housing Strategy; 
(ii) note that the consultative draft Local Housing Strategy will be presented to this
Committee on 9 September 2025, for approval prior to public consultation; 
(iii) approve the revised Scheme of Assistance; and 
(iv) grant delegated authority to the Head of Housing and Property to procure
consultancy/resource to complete a Sheltered Housing Review.  
10.         Evaluation of the Tenancy Sustainment Fund 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Committee to consider the evaluation of the
Tenancy Sustainment Fund (TSF) which operated during the fiscal year 2023/24, an
update on activity in 2024/25 and proposals for ongoing provision.  
Following consideration the Committee unanimously agreed to:-  
(i) note the evaluation of the Tenancy Sustainment Fund as detailed in Section 5; 
(ii) note the reduction in rent arrears achieved during 2024/25 as detailed in
paragraphs 5.3 to 5.7; 
(iii) approve the establishment of a Tenancy Sustainment Fund on an ongoing basis
as detailed in paragraph 5.8; 
(iv) the addition of a further 1.0 FTE Area Housing Officer as detailed in paragraphs
5.6 and 5.10; and 
(v) delegate authority to the Head of Housing and Property, in consultation with the
Chief Financial Officer, to write-off rent arrears balances in exceptional
circumstances, where balances are deemed unreasonable to pursue as set out
in paragraph 5.11.  
11.         Place Standard Tool for Community Safety Lens 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing Committee of the Place Standard Tool pilot for
Page 9

Page 10

community safety, and seeking approval for the recruitment of a temporary member
of staff to provide co-ordination support for the pilot scheme.  
Following consideration the Committee unanimously agreed to:-  
(i) note the selection of Moray Council for the pilot project for the Place Standard
Tool for Community Safety, by Public Health Scotland and the Scottish
Community Safety Network; and 
(ii) approve the funding to recruit a temporary member of staff to provide co-
ordination support for the pilot project.  
12.         Housing and Property Services Budget Report to 31 March 2025 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) to inform Committee on the interim outturn position for
the Housing Revenue Account and General Services Housing and Property budgets
for the period up to 31 March 2025.  
Following consideration the Committee unanimously agreed to note the interim
outturn for 2024/25 for the period to 31 March 2025, consisting of a surplus balance
of £2,250k for the Housing Revenue Account and an underspend of £430k for the
General Services Housing and Property budget.  
13.         Allocations Policy Annual Performance Report 2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing Committee of the performance of the Council's
Allocations Policy during 2024/25.  
In introducing the report, the Housing Needs Manager provided an update advising
the service had undertaken a cleansing exercise relating to the waiting and transfer
lists significantly changing the 2024/25 figures in Table 1 of Appendix 1 relating to
numbers of applicants on the Housing List at year end.  He confirmed the revised
figures for 2024/25 are Homeless List - 132; Housing Waiting List - 1898; Transfer List
- 543 giving an amended total of 2573 applicants on the housing list at year end. 
Following consideration the Committee unanimously agreed:-  
(i) to note the performance identified within the report and detailed within
Appendix 1; and 
(ii) the allocation quotas for 2025/26 detailed at paragraph 5.11 of the report.  
14.         Performance Report (Housing and Property) - Period to March 2025 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Committee of the performance of the service
for the period to the end of March 2025.  
Page 10

Page 11

Following consideration the Committee unanimously agreed to note performance in
areas of Service Planning, Service Performance and other related data to the end of
March 2025 and actions being taken to improve performance where required.  
15.         Housing and Property Services Service Plan 2025-26 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) inviting the Committee to consider the Housing and
Property Services Service Plan for 2025-28.  
Following consideration the Committee unanimously agreed to approve the Service
Plan for Housing and Property Services for the year ahead in Appendix 1.  
16.         Information Reports - if called in 
The Committee noted that no Information Reports had been called in.  
17.         Building Services Budget 2024-25 - Budget Monitoring [Para 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) presenting the draft budget monitoring information for the
period to 31 March 2025 for the Building Services Trading Operation.  
Following consideration the Committee unanimously agreed to:-  
(i) note the draft financial information for the period to 31 March 2025, as detailed
in section 6 and Appendix 1 of the report; and 
(ii) note Building Services operating performance for the period to 31 March 2025,
as set out in section 7 of the report.   
Page 11

Page 12

Page 12

Page 13

Report to: Housing and Community
Safety Committee
Meeting Date: 9 September 2025   
Report by:  Executive Director for
Education, Housing and
Communities 
Report No:  HPS050/25   
Author: Edward Thomas Contact
Email:
edward.thomas@moray.gov.uk   
Subject:  Housing and Property Services Budget Monitoring Report to 30 June 2025 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider the budget position for the Housing Revenue
Account (HRA) and General Services Housing and Property Budget for the period up to 
30 June 2025.  
1.2  This report is submitted to Committee in terms of Section III (G) (1) of the Council's
Scheme of Administration relating to the management of budgets.   
2.  SUMMARY  
2.1  This report provides an overview of the budget position for the HRA and General Services
Housing and Property Budget for the first quarter of the 2025/26 reporting year.  
2.2 An overspend of £373k is reported for the HRA and an underspend of £149k for General
Services Housing and Property for the period to 30 June 2025. 
3.  RECOMMENDATION 
3.1  It is recommended that Committee:   
i)  scrutinises and notes the budget monitoring report for the period to 30 June
2025.   
Edward Thomas
Head of Housing, Property and Communities
Item 6.
Page 13

Page 14

4.  BACKGROUND AND CONTEXT  
4.1  Moray Council agreed the HRA Budget for 2024/25 at the meeting on 26 February 2025
(paragraph 4 of the Minute refers). Housing and Property budget monitoring reports are
presented quarterly.   
5.  PROPOSALS   
Housing Revenue Account to 30 June 2025
5.1  Appendix I details the HRA budget position to 30 June 2025.  
5.2  HRA expenditure for the period to 30 June 2025 is as follows: 
Annual Budget
2025-26
Budget to
30/06/2025
Actual to
30/06/2025
Variance to
30/06/2025
£,000 £,000 £,000 £,000
28,838 3,185 3,392 (207) 
5.3  HRA income for the period to 30 June 2025 is as follows: 
HRA Income
2025-26
Budget to
30/06/2025
Actual to
30/06/2025
Variance to
30/06/2025
£,000 £,000 £,000 £,000
28,838 7,670 7,504 (166)  
5.4  The overall position for the HRA is an overspend of £373k for the period to 30 June 2025, comprised
of £207k higher than budgeted expenditure and £166k lower than budgeted income. The detail of
these variances is set out below. 
HRA Expenditure
2025/26
Budget to
30/06/2025
Actual to
30/06/2025
Variance to
30/06/2025 
£,000 £,000 £,000
Supervision &
Management
1,367 1,275 92
Sheltered Housing 15 9 6
Repairs &
Maintenance
1,683 2,066 (383)
Bad & Doubtful
Debts
25 18 7
Downsizing
Incentive Scheme 
18 15 3
Service
Development
77 9 68
Total Expenditure 3,185 3,392 (207) 
5.5 Supervision and management – there are a range of variations within this budget resulting
in a net underspend of £92k. The main underspends were in relation to Staffing (£124k),
arising from the budgeted pay award provision not yet being required and the level of
vacancies. There were also underspends in software costs (£5k), training (£5k) and other
Page 14

Page 15

minor underspends (£2k). The underspends were partially offset by an overspend of £44k
in void costs, arising from higher costs per property. 
5.6 Sheltered Housing – there was an overspend of £6k arising from lower than budgeted
energy costs (£8k), partially offset by an overspend in minor cumulative elements of
expenditure (£2k). 
5.7 Repairs and maintenance – there was an overspend of £383k in the repairs and
maintenance budget, which comprised of £622k in additional planned/cyclical
expenditure and £55k in void costs. This is largely attributable to £330k in roof and fabric
works and £291k in electrical upgrades. Whilst these elements have been coded as
revenue expenditure in the first instance, a proportion of these costs will subsequently be
coded as capital investment, given the nature of the work. These overspends were partially
offset by an underspend of £294k in response repairs, arising from lower levels of activity. 
5.8 Bad and doubtful debts – there was an underspend of £7k, arising from lower than
anticipated write-offs.  
5.9 Downsizing Incentive Scheme – there was an underspend of £3k arising from slightly lower
uptake. 
5.10 Service Developments – there was an underspend of £68k, with a number of proposals
approved by committee in June 2025 progressing in later periods following recruitment and
other processes. 
5.11 HRA income for the period to 30 June 2025 is as follows: 
HRA Income
2025/26
Budget to
30/06/2025
Actual to
30/06/2025
Variance to
30/06/2025 
£,000 £,000 £,000
Non-dwelling
rents
88 90 2
House Rents 7,537 7,317 (220)
Other Income 45 97 52
Total Income 7,670 7,504 (166) 
5.12 The income at 31 March 2025 was £166k lower than expected.  This arises from £220k less
in rental income, attributable to a higher number of tenancies retaining the EPC discount,
pending completion of energy improvement works. Other income is £52k higher than
budgeted, with £28k derived from the grass cutting scheme and £24k in rechargeable
repairs.     
General Services Housing and Property to 30 June 2025
5.13 Appendix II provides details of the budget position to 30 June 2025.  
5.14 General Services Housing and Property expenditure for the period to 30 June 2025 is as
follows: 
Page 15

Page 16

Annual Budget Budget to
30/06/2025
Actual to
30/06/2025
Variance to
30/06/2025
£4,069k £588k £439k £149k 
5.15 The overall position for General Services Housing and Property is an underspend of £149k
for the period to 30 June 2025. The detail of these variances is set out below. 
Service
Description
Budget to
30/06/2025
Actual to
30/06/2025
Variance to
30/06/2025 
£,000 £,000 £,000
Planning &
Development
45 29 16
Housing
Management
11 11 0
Homelessness /
Allocations
446 400 46
Miscellaneous
General Services
Housing
29 19 10
Building Services  (74) (74) -
Property
Services 
131 54 77
Total
Expenditure
588 439 149 
5.16 Planning and Development - consists of Improvement Grants and Affordable Housing
budgets, including disabled adaptations.  The position at 30 June 2025 shows an
underspend of £16k, arising from the timing of general capital grant income – this will be
reprofiled in Quarter 2 of the reporting year.    
5.17 Housing Management - relates to the Gypsy/Traveller budget. There is no variance in the
period to 30 June 2025.  
5.18 Homelessness/Allocations - comprises of Homelessness and Housing Support services. 
There was an underspend of £46k in this budget, comprised of underspends in Temporary
Accommodation (£46k) arising from additional income from revised charges, and other
minor cumulative underspends (£5k), partially offset by an overspend of £5k in Housing
Support.  This continues to represent a significant improvement on the longstanding deficit
in temporary accommodation prior to the increase in service charges in 2024/25.   
5.19 Miscellaneous General Services Housing – comprises various small budgets for which
there is currently a £10k underspend arising from lower repairs and higher rental income.  
5.20 The Building Services Budget - is reported in detail separately on this Committee’s agenda
and any surplus achieved or deficit will be returned to the HRA. 
5.21 The Property Services Budget - includes the budgets for the Design Team and Property
Resources. There is an overall underspend of £77k to date. Within the Design Team there
was an overspend of £97k, predominantly arising from lower income from fees within the
period (£96k), which is being monitored and may be subject to revision when capital
Page 16

Page 17

recharges are apportioned. Property Asset Management has a £174k underspend, the
largest components of which arise from higher income from the industrial portfolio
(£118k), energy efficiency payments (£28k) and lower expenditure on corporate and
schools repair and maintenance (£21k). 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial X 
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy.
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☒ Improving wellbeing of our population. 
6.3  Policy and Legal 
There are no policy or legal implications arising from this report.  
6.4  Financial 
The financial implications of this report are considered in Section 5 of this report and
detailed in Appendices I and II. 
Page 17

Page 18

One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Budget Managers are aware of their responsibilities for managing budget allocations and
approval for variance will be sought from the Committee in line with Financial Regulations.  
6.6  Staffing 
There are no staffing implications arising from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications arising from this report.  
6.8  Property 
There are no property implications arising from this report.  
6.9  Information Communications/Technology/Digital 
There are no information communications/technology/digital implications arising from
this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities/socio economic impacts arising from this report.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change/biodiversity impacts arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in close consultation with Finance colleagues. 
Consultation on this report has been carried out with the Chief Financial Officer, G.
Anderson (Senior Solicitor), Senior Managers within Housing and Property Services and L.
Rowan (Committee Services Officer), with feedback incorporated into the report as
relevant.   
8.  BACKGROUND PAPERS  
8.1  HRA Budget Report 26 February 2025:
Housing Revenue Account Annual Budget 2025-26
Page 18

Page 19

Housing Revenue Account Annual Budget 2025-26 - Appendix I
Housing Revenue Account Annual Budget 2025-26 - Appendix II
Housing Revenue Account Annual Budget 2025-26 - Appendix III 
H&PS Budget Report 24 June 2025: 
Housing and Property Budget Report to 31 March 2025
Page 19

Page 20

Housing Revenue Account       Appendix I     
Budget Monitoring to 30th June 2025     
Service Description Annual
Budget
2025-26
Budget to
30th June
2025
Actual to
30th June
2025
Variance
to 30th
June
2025
Expenditure £,000 £,000 £,000 £,000
Supervision & Management 6,455 1,367 1,275 92
Sheltered Housing 66 15 9 6
Repairs and Maintenance 10,183 1,683 2,066 (383)
Financing Costs 8,413 0 0 0
Bad & Doubtful Debts 250 25 18 7
CFCR  3,089 0 0 0
Downsizing Incentive Scheme 72 18 15 3
Service Development 310 77 9 68
Total Gross Expenditure 28,838 3,185 3,392 (207)          
Income £,000 £,000 £,000 £,000
Non-dwelling rents 275 88 90 2
House rents 28,034 7,537 7,317 (220)
IORB 350 0 0 0
Other income 179 45 97 52
Total Income 28,838 7,670 7,504 (166)          
Surplus / (Deficit) for the year 0 4,485 4,112 (373)          
Accumulated Surplus Balance
brought forward    
2,233            
Estimated Surplus Balance at
31st March    
2,250  
Page 20

Page 21

General Services Housing & Property      Appendix II  
Monitoring to 30th June 2025      
Annual Budget Actual &
committed
Variance
Service Description Budget to to at  
2025-26 30th June
2025
30th June
2025
30th June
2025    
£'000 £'000 £'000 £'000
Planning & Development 233 45 29 16  
Housing Management 16 11 11 0  
Homelessness / Allocations 1876 446 400 46  
Miscellaneous General
Services Housing
86 29 19 10  
Building Services 0 (74) (74) 0  
Property Services 2259 131 54 77  
General Services Housing &
Property Savings
(240) 0 0 0  
General Services Housing &
Property Allocations
(161) 0 0 0  
General Services Housing &
Property Total 
4069 588 439 149 
Page 21

Page 22

Page 22

Page 23

Report to: Housing and Community
Safety Committee 
Meeting Date: 9 September 2025  
Report by: Executive Director for
Education, Housing and
Communities 
Report No: HPS047/25  
Author: Fiona Geddes  Contact
Email:
housingstrategy@moray.gov.uk 
Subject: Consultative Draft Local Housing Strategy 2025-2030 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to seek approval of the consultative draft Local Housing
Strategy (LHS) 2025-2030 and consent to begin public consultation.  
1.2  This report is submitted to Committee in terms of Section G (11) of the Council's Scheme
of Administration relating to the formulation and implementation of the Council’s strategic
Housing Plan. 
2.  SUMMARY  
2.1  The report provides a summary of the progress made in the development of the Local
Housing Strategy 2025-2030.   
3.  RECOMMENDATIONS – 
3.1  It is recommended that Committee:   
i)  approves the consultative draft LHS for public consultation; 
ii)  comments on the draft LHS Integrated Impact Assessment available at
APPENDIX I; 
iii)  agrees to a period of public consultation on the consultative draft LHS from
10 September to 7 November 2025; and 
iv)  notes that the final LHS will be presented to the Committee on 12 March 2026
for agreement, prior to publication.   
Fiona Geddes
Service Manager, Housing Strategy
Item 7.
Page 23

Page 24

4.  BACKGROUND AND CONTEXT  
4.1  The Housing (Scotland) Act 2001 requires local authorities to produce a Local Housing
Strategy (LHS) supported by an assessment of housing need and demand.    
4.2  On 13 Feb 2024, this Committee was advised of the “robust and credible” status of the
Housing Need and Demand Assessment 2023 (HNDA) (para 6 of the Minute refers).  
4.3  On 24 June 2025, this Committee considered a report on the development of the LHS
2025-2030 (para 9 of the draft minute refers).  
4.4  The consultative draft is being developed in accordance with Scottish Government
Guidance published in 2019. 
5.  LHS DEVELOPMENT  
5.1  The LHS will set out how the Council and its partners intend to alleviate housing need,
address homelessness and improve the whole housing system.  The LHS actions range
from building more new affordable houses of the right type and in the right location, to
reducing fuel poverty, improving the condition of housing and alleviating homelessness. 
5.2  The LHS has been in development since July 2024.  It has been developed using a
collaborative co-production approach between partners, consultation with stakeholders
and the public, and is underpinned by the findings of the HNDA 2023.  Arneil Johnston
have facilitated the consultation activities.  
5.3  The development of the LHS is overseen by the multi-agency Housing Market Partnership,
supported by Arneil Johnston.  This group includes representatives from the relevant
Council Services and other agencies e.g. Planning, Health and Social Care Moray, NHS
Grampian, Registered Social Landlords), Scottish Government enterprise companies,
private sector representative bodies and Third Sector Representatives.  The Housing
Market Partnership has been key to LHS development.  
5.4  The consultative draft LHS vision is “In Moray everyone has access to the right home, in the
right place at the right time”.  To achieve this vision and tackle the main priorities for action
identified by local residents, partners and stakeholders, the following four LHS priorities
have been defined: 
Priority 1: Building more homes creates sustainable communities and enables economic
growth.
Priority 2: Making better use of existing homes prevents homelessness and improves
housing options and choice.
Priority 3: Partnership working maximises housing’s role in improving health and
wellbeing.
Priority 4: Improving property condition and achieving affordable warmth is enabled in all
homes.  
5.5  A draft LHS Integrated Impact Assessment (IIA) has been prepared, using the HNDA 2023
as its evidence base.  The draft LHS IIA is available at APPENDIX I.
Page 24

Page 25

5.6  Public consultation arrangements
The consultative draft LHS and associated Action Plan are available on the Council’s
website at www.moray.gov.uk/housingstrategies.  A period of public consultation is
proposed, from 10 September to 7 November 2025.  Officers propose the use of the
Council’s new Engage system, web-based surveys and the Council’s social media as the
primary means of interaction with the general public.  Officers propose that the web-
based survey takes the form of a series of questions seeking approval ratings on the
actions proposed in the draft LHS, with the facility to provide text/comments.  
5.7  Finalising the LHS
The final draft of the LHS will be presented to this Committee on 12 March 2026 for
approval prior to publication.  The report in March will present the results of the public
consultation.  
5.8  The LHS will set out how the Council and its partners intend to alleviate housing need,
address homelessness and improve the whole housing system.  The LHS actions range
from building more new affordable houses of the right type and in the right location, to
reducing fuel poverty, improving the condition of housing and alleviating homelessness. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact               X 
Climate Change and Biodiversity Impact  X 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
Page 25

Page 26

b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy.
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population.   
6.3 Policy and Legal 
It is a requirement of the 2001 Housing (Scotland) Act that local authorities have a Local
Housing Strategy.  Detailed guidance has been produced by the Scottish Government.  
6.4 Financial 
There are no implications arising directly from this report. 
One off Costs:
Service Area Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service Area Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5 Risk 
There are no implications arising directly from this report.  
6.6 Staffing 
There are no implications arising directly from this report.  
6.7 Best Value and Transformation 
There are no implications arising directly from this report.  
6.8 Property 
There are no implications arising directly from this report.  
6.9 Information Communications/Technology/Digital 
There are no implications arising directly from this report.  
6.10 Equalities, Social Inclusion and Economic Impact 
It is a statutory requirement that equality issues should be addressed in the LHS.   The LHS
includes strong themes on economic disadvantage and inequality.  Data and evidence
about the specialist housing and support needs of equalities groups has been gathered as
part of the Council’s Housing Need and Demand Assessment 2023.  The consultative draft
LHS sets out how the Council intends to address these needs.  A draft Integrated Impact
Page 26

Page 27

Assessment is available at APPENDIX I, which will form part of the public consultation. 
Equality groups will be included in the LHS consultation. 
6.11 Climate Change and Biodiversity Impacts 
The aims of the Local Housing Strategy are closely aligned to the Council’s Climate
Change Strategy, and Local Heat and Energy Efficiency Strategy (LHEES). 
7.  CONSULTATION  
7.1 This report has been prepared in consultation with the Executive Director for Education,
Housing and Communities, the Head of Housing, Property and Communities, the Acting
Head of Growth, Planning and Climate (Chief Planning Officer), the Service Manager,
Strategic Planning and Development, G. Anderson (Legal Services Senior Solicitor), the
Chief Social Work Officer, Chief Officer MIJB, the Service Manager, Property, Estates and
Assets, the Housing Operations Manager, the Service Manager, Housing Needs, the Chief
Financial Officer, the Equal Opportunities Officer and L. Rowan (Committee Services
Officer). 
8.  BACKGROUND PAPERS  
8.1 Held by author.
Document.ashx   
Page 27

Page 28

APPENDIX I 
Page 6 of 12 
INTEGRATED IMPACT ASSESSMENT (IIA)
This assessment covers:
• Equalities & Socio-Economic Duties
• Human Rights & Rights of the Child (UNCRC) 
EXECUTIVE SUMMARY
DATE
DD/MM/YY
UPDATE(S) - Add section(s) revised & brief note of revision.  Refer IIA Guidance. 
E.g. - First draft IIA for consideration at XXX Committee/Board on DD/MM/YY
E.g. – Q.7 Revised with outcome of public consultation and results
SHAREPOINT
VERSION DETAILS
ADDED BY CMT 
16/07/25 1st draft IIA for consideration at Housing & Community Safety Committee 9
September 2025 
Name of proposal (Note - proposal covers any strategy, plan, policy, project, budget saving, change to service): 
Local Housing Strategy 2025-2030
Is this a: Please Tick √ 
New strategy, policy, project, plan, service? 
Change to an existing strategy, policy, project, plan, service? ✓
Budget proposal? 
STAGE 1 SCREENING - DO I NEED AN IIA?  If ‘Yes’ or ‘Maybe’ please go to Stage 2 and
complete full IIA
If all No,
sign off IIA
Does the proposal impact(s) any of the following:    Yes Maybe No
Positive Negative Positive Negative
Equalities – any positive or negative impact(s) to
people from protected characteristic group(s) 
✓ ✓   
Socio-economic disadvantage – low / no income /
wealth or deprivation
✓    
Human Rights of individuals ✓  
Rights of Children or Young People ✓  
Reasoning – Please briefly describe the reasons you have ticked the above boxes i.e. why it
will/may affect these groups positively or negatively.  
The Local Housing Strategy (LHS) 2025 – 2030 aims to address inequalities in housing by improving
access to housing across all tenure, supporting vulnerable households and those with specialist
housing needs.  Its role is to support households who may be at a disadvantage to ensure they have
access to suitable housing options that are affordable to them.  
This LHS has been designed with the aim of reducing socio-economic disadvantage and mitigate any
potential impact on human rights or the rights of children.
The Scottish Government has published guidance to help local authorities develop their LHS.  The
guidance requires equality issues to be mainstreamed throughout the LHS.  
Lead Officer
Signature 
Date 
Others involved in
initial screening 
Page 28

Page 29

APPENDIX I 
Page 7 of 12 
STAGE 2 – FULL IIA 
Brief description of the proposal
1. Please describe what the proposal is. 
The Housing (Scotland) Act 2001 requires all local authorities to publish a Local Housing Strategy
(LHS).  The LHS is a planning tool which sets out the actions the Council and its partners will take to
seek to achieve its aim.  The LHS’s vision, as stated in the consultative draft LHS 2025-30 is: “In Moray
everyone has access to the right home, in the right place at the right time.”
To achieve this vision and tackle the main priorities for action identified by local residents, partners
and stakeholders, the following four LHS priorities have been defined:
1. Building more homes creates sustainable communities and enables economic growth
2. Making better use of existing homes prevents homelessness and improves housing options
and choice
3. Partnership working maximises housing’s role in improving health and wellbeing
4. Improving property condition and achieving affordable warmth is enabled in all homes 
2. Who are the main stakeholders? 
The LHS is developed in conjunction with the Local Development Plan.  Both strategic documents
have extensive public and stakeholder consultation as an intrinsic part of their development.  The LHS
also uses the Housing Need and Demand Assessment (HNDA) as a key evidence base, the
development of which also includes extensive stakeholder consultation.  Main stakeholders include:
• Moray households in housing need and homeless.
• Moray Council tenants and Housing Association tenants in housing need.
• Older and disabled people in housing need.
• Households experiencing fuel poverty.
• Households living in poor housing conditions.
• A wide range of housing professionals and partner organisations who have an interest in
housing and housing related pressures/issues such as the Scottish Government, social
housing providers, Integration Joint Board/Health and Social Care, NHS, employers and
housing developers.
3. What changes as a result of the proposals? Is the service reduced or removed?
There is no reduction or removal of existing services.
4. How will the proposal affect your customers?
The strategy aims to ensure housing need is met within the agreed priorities.
5. What impact will the proposal have on staff providing the service?
No change to resources, the strategy is delivered within existing budgets. 
6. IMPACTS
EQUALITIES AND SOCIO-ECONOMIC DUTIES - Please √ any impact to each group
Protected Groups – Click here for info Negative Positive Considerations
Age (include children, young people,
midlife and older people) 
✓ • Responds to the needs of Moray’s
ageing population by prioritising
housing solutions and adaptations
to make sure homes are suitable to
Page 29

Page 30

APPENDIX I 
Page 8 of 12 
6. IMPACTS
EQUALITIES AND SOCIO-ECONOMIC DUTIES - Please √ any impact to each group
Protected Groups – Click here for info Negative Positive Considerations
the needs of older people and
support independent living.  
• Recognises the need for
intergenerational housing solutions
• Supports initiatives that stimulate
turnover or encourage households
to move from properties which do
not meet their needs e.g. through
an incentive scheme to release
larger family homes.
Carers (for elderly, disabled or
minors) 
✓ No specific impacts identified but
accessible housing delivery considers
the needs of households with carers
and those who may need carers in the
future.
Disability  ✓ Supports the delivery of accessible
and specialist housing as well as
investment in aids, adaptations and
technology-enabled care for
independent living.
Gender reassignment   No specific impacts identified.
Marriage and civil partnership   No specific impacts identified.
Pregnancy and maternity (including
breastfeeding) 
✓ Supports those experiencing
overcrowding and aims to prevent
homelessness or provide appropriate
temporary accommodation to families
if needed.
Race ✓  Moray lacks authorised halting sites for
Gypsy/Travellers and Travelling Show
People.  Unauthorised Encampment
Protocol respects their cultural identity
and affirming their cultural identity and
right to a travelling lifestyle.
Religion and / or belief   No specific impacts identified.
Sex  ✓ Supports those experiencing domestic
abuse through housing and support.
Sexual orientation   No specific impacts identified.
Inequalities arising from socio-
economic disadvantage 
✓ • Tackles fuel poverty, housing
affordability, and child poverty to
support low-income households.
• Supports low-income households
through affordable housing and
energy efficiency measures. 
Page 30

Page 31

APPENDIX I 
Page 9 of 12 
HUMAN RIGHTS  If applicable, briefly state if / how right is engaged
Article 5 Right to liberty and security Prevents homelessness and supports independent
living.  Reduces risks of institutionalisation or
detention due to lack of housing.
Article 6 Right to a fair trial N/A
Article 8 Respect for private / family life, home
and correspondence
The LHS supports this right by:
• Preventing homelessness.
• Enabling people to remain in their homes
through adaptations and support.
• Addressing overcrowding and under-
occupation.
• Supporting Gypsy/Traveller and Travelling Show
Peoples’ right to maintain their cultural way of
life.
Article 10 Freedom of expression The LHS promotes community engagement and
consultation, allowing individuals and groups to
express views on housing needs and policies.
Article 11 Freedom of assembly and association The LHS supports community-led housing and
local place planning, which may facilitate collective
action and association.
Article 12 Right to marry N/A
Article 14 Protection from discrimination in
respect of these rights
The LHS eliminates discrimination when accessing
housing and outcomes for protected groups.
Protocol 1, Article 1- Right to peaceful
enjoyment of property
The LHS protects property rights by:
• Supporting homeowners with repairs and
adaptations.
• Encouraging responsible private renting.
• Preventing unlawful eviction through
homelessness prevention.
Protocol 1, Article 2 - Right to education N/A
Protocol 1, Article 3 - Right to free elections by
secret ballot
N/A 
RIGHTS OF CHILDREN & YOUNG PEOPLE (UNCRC) If applicable, briefly state if / how right is engaged
Article 2 – Non discrimination The LHS includes a strong commitment to equality
and inclusion.  It addresses housing inequalities
that affect children from low-income families,
minority ethnic backgrounds, and those with
disabilities.  The strategy also recognises the needs
of the children of the Gypsy/Traveller and Travelling
Show People community, affirming their cultural
identity and right to a travelling lifestyle. 
Page 31

Page 32

APPENDIX I 
Page 10 of 12 
RIGHTS OF CHILDREN & YOUNG PEOPLE (UNCRC) If applicable, briefly state if / how right is engaged
Article 3 – Best Interest of a Child The LHS prioritises safe, stable, and suitable
housing for families, which is essential for
children’s wellbeing.  It supports homelessness
prevention, reducing the risk of children
experiencing housing instability or living in
temporary accommodation. The LHS also
promotes child-friendly communities through local
place planning and access to services.
Article 6 – Right to life, survival and development The LHS contributes to children’s development by:
• Tackling child poverty through affordable
housing.
• Improving housing conditions to reduce health
risks (e.g. damp, overcrowding).
• Supporting energy efficiency and affordable
warmth, which are critical for children’s health
and development.
Article 12 – Respect the views of the child While the LHS includes broad community
consultation, it does not include the views of
children.
Article 23 – Children with a disability The LHS allows provision for meeting housing need
of disabled children. 
7. Evidence - Please list the information you have used to make your assessment to date?
Performance data Statutory indicators within Scottish Government Returns and
the Annual Return on the Charter.
Internal consultation Will take place formally as part of the Committee process but
there has been extensive consultation within housing and other
council representation prior to the development of the draft
strategy.
Consultation with affected groups • Extensive research and consultation carried out as part of
2023 HNDA detailed at: www.moray.gov.uk/hnda.  This
included a primary research survey with 911 responses and
a separate assessment on the needs of Gypsy/Travellers
and Travelling Show People.
• LHS early engagement survey completed by 360 residents
and community representatives to identify the current
circumstances, future intentions and housing aspirations
of Moray households and confirm the earlier findings of the
HNDA.
• Multi-agency steering group formed to provide a
governance framework for the development and
implementation of the LHS. Representatives include
partners from Moray Council, (Housing, Planning,
Homelessness, Private Sector and LHEES teams),
Registered Social Landlords and HSCP partners.
Page 32

Page 33

APPENDIX I 
Page 11 of 12 
• Stakeholder conference on 20 March 2025 (online) with
over 50 partners and stakeholders attended the event,
including representatives from public, private, third and
community sectors.
• Four half-day workshop sessions were held to
systematically appraise LHS options against pre-
determined criteria with subject matter experts to
formulate action plan.
• Draft strategy to be presented to Housing and Community
Safety Committee for consideration and approval to
commence formal consultation with the public and
undergo peer review from both the Scottish Government
and another local authority.
Local statistics • Primary and secondary research gathered for the 2023
HNDA and LHS
• Primary research from LHS early engagement survey.
• Data collated internally, and through other Council
departments.
National statistics Existing published sources e.g. NRS population/household
estimates, Scottish Government datasets.
Other • Scottish Government local housing strategy guidance (2019).
• National strategies such as Housing to 2040.
• Local authority strategies such as the Moray Local Outcomes
Improvement plan (LOIP).
• Departmental strategies such as the Local Development
Plan (LDP) and Local Heat and Energy Efficiency Strategy
(LHEES)
• Local housing strategies of other local authorities. 
8. Evidence gaps - Do you need any additional information to complete Q7 Evidence above?
No 
9. Mitigating action(s) - Can the impact(s) identified above be lessened in any way?  Please explain 
Mitigations for identified potential impacts include:
• No authorised halting site for Gypsy/Travellers and Travelling Show People in Moray - The
Housing Service currently follow an Unauthorised Encampment Protocol to ensure the
provision of waste facilities, serviced toilets as well as housing advice and signposting where
applicable to respect their culture.  The Moray Local Development Plan provides a critical
mechanism for addressing the long-standing shortfall in sites for the Gypsy/Traveller and
Travelling Show People community.  Preparatory work for the new Local Development Plan
(Planning) will include consideration of the lack of authorised sites, dependent on the level of
engagement that can be sought with the Gypsy/Traveller and Travelling Show People
community.
10. Justification - If there are no mitigating action(s) identified that can lessen the negative impacts,
please explain any justification(s) that may allow the proposal to go ahead?  Please delete as appropriate*
The LHS supports equality, diversity and inclusion in every aspect that is within the Housing Services’
control.  
Page 33

Page 34

APPENDIX I 
Page 12 of 12 
STAGE 3 – IMPACT SUMMARY Please Tick (√)
Some potential negative impacts have been identified in terms of the Council’s
Public Sector Equality Duty (PSED) in relation to:
• Reducing discrimination, harassment, victimisation  ✓
• Promoting equality of opportunity ✓
• Fostering good relations ✓
The proposals interfere with Human Rights and / or the Rights of the Child 
Negative impacts can be mitigated as per Q9 ✓
Negative impacts cannot be fully mitigated but are justified as per Q10 
Negative impacts cannot be fully mitigated or justified as per Qs 9 &10 
Further consultation with affected groups is needed 
It is advised not to go ahead with the proposals 
FINAL DECISION – Please set out the rationale for deciding to proceed with the proposal or not. 
Date of Final Decision 
FINAL SIGN OFF AND AUTHORISATION
Service Education, Housing & Communities
Department  Housing, Property & Communities
IIA Completed By Name  Daska Murray
Position Senior Housing Officer (Strategy)
Date 16.07.25
Head of Service
Authorisation
Name  Edward Thomas, Head of Housing, Property & Communities
Date 
Permission to Publish IIA 
Please return the completed IIA to equalities@moray.gov.uk 
Page 34

Page 35

Report to: Housing and
Community Safety
Committee
Meeting Date: 9 September 2025  
Report by: Executive Director for
Education, Housing and
Communities 
Report No: HPS033/25  
Author: Emma Armit Contact Email: Housing.Policy@moray.gov.uk 
Subject: Rent Arrears Policy Review 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider and approve the contents of the Council’s draft
Rent Recovery Policy and approve it to progress for public consultation. 
1.2  This report is submitted to Housing & Community Safety Committee in terms of Section III
(G) (1c) of the Council’s Scheme of Administration relating to Capital and Revenue
budgeting and long-term financial planning in the discharge of the Council's Housing
function to deal with levy, collection, payment and recovery of Council house rents. 
2.  SUMMARY  
2.1  This report presents a review of the Councils previously named Rent Arrears Policy in line
with wider legislative and guidance changes, updates welfare reform considerations and
some minor changes throughout.   
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee:   
i) considers and approves the revised draft Rent Recovery Policy as set out in 
APPENDIX I; 
ii) agrees that a consultation exercise on the revised Rent Recovery Policy is 
undertaken, as set out in Section 5 below; and 
iii) notes that an update report, detailing the consultation findings and providing a
final revised policy for approval, will be presented to this Committee in 
November 2025.
Item 8.
Page 35

Page 36

Emma Armit
Senior Housing Officer (Policy) 
4.  BACKGROUND AND CONTEXT  
4.1  On 6 October 2004, the Community Services Committee approved the Council’s Rent
Arrears Policy (para 10 of the Minute refers).  The Communities Committee approved
further changes to the current Rent Arrears Policy on October 2013 (para 11 of the Minute
refers). This followed the introduction of pre-action requirement protocols which afforded
tenants further protection before facing rent arrears eviction under the Housing (Scotland)
Act 2010.  The Welfare Reform Act 2012 also introduced additional supportive
requirements in relation to the under-occupancy charge and Universal credit at that time. 
4.2  The policy was due for review in 2015. This had not been undertaken due to limited staff
resources, internal change management plans and prioritisation of workloads to meet
service requirements.  
4.3  On 12 February 2025 the Audit and Scrutiny Committee considered the Internal Audit
review report on Housing Rents Collection and Arrears Management (para 9 of the Minute
refers).  This identified that the Housing Service has “well established practices in place in
administering housing rent accounts and accounting for monies collected, with strong
audit trails seen in evidencing actions taken in the continual cycle of monitoring and
pursuing rent arrears.”  The audit acknowledged that although the Rent Arrears Policy is
still relevant and that Moray has continued to perform well when compared to national
averages and other local authorities, it recommended that the Rent Arrears Policy should
be reviewed and if necessary updated along with any supporting operational procedures
to ensure consistency.  Interim deadlines in the report have been achieved and an overall
deadline of 31 December 2025 was agreed with the Head of Housing,  Property and
Communities and the Housing Operations Manager with a follow-up exercise scheduled
for early 2026 to assess the progress made.  
4.4  On 13 February 2024, this Committee approved the Tenancy Sustainment Fund (TSF) to
assist vulnerable Council tenants who are facing financial hardship due to the cost-of-
living crisis (Para 7 of the Minute refers).   The TSF aims to support tenancy sustainment
and prevent homelessness by offering financial assistance where full repayment of arrears
is considered as uneconomic or inappropriate due to financial hardship.  The TSF may be
used in cases where small arrears balances exist but which are not proportionate to the
resource and cost incurred to recover the debt.  Tenants must meet an eligibility criteria
with cases being assessed on their individual merits.  A report on the Evaluation of the
Tenancy Sustainment Fund 23/24 was presented to this Committee on 24 June 2025 (para
10 of the Minute refers).  The Committee approved the following which has been
incorporated into the policy review:
• an ongoing tenancy sustainment fund with £60k allocated from the HRA Service
Development budget for 2025/26;
• a 1.0 FTE Area Housing Officer dedicated to intensive rent arrears management in high
arrears cases/areas; and
• delegated authority to the Head of Housing and Property, in consultation with the Chief
Financial Officer, to write-off rent arrears balances in exceptional circumstances.    
Page 36

Page 37

4.5  The principal aims of the Policy are to prevent rental debt from the outset where possible
and minimise levels of rent arrears in an effective and sensitive manner to help tenants
sustain their tenancies while preventing homelessness. This can only be achieved through
the use of timely, effective communication in relation to prevention, early intervention and
targeted support. 
5.  PROPOSALS  
5.1 Key Changes 
The revised Policy (APPENDIX I) continues to encourage a firm, fair, consistent approach
towards rent arrears management while continuing to support tenants wherever possible. 
The key changes proposed to the policy are:
• Change of title from Rent Arrears Policy to Rent Recovery Policy to better reflect the
prevention and early intervention work that takes place prior to any accrual of 
rental arrears;
• Inclusion of the regulatory requirements set out in the Scottish Social Housing
Charter Outcomes that Moray Council as a social landlord is required to meet at
Section 4 of the draft policy;
• Updated legislative framework provisions which detail the statutory pre-action
requirements the Council must adhere to prior to seeking any eviction action, at
Sections 4 and 11 of the draft policy;
• Enhanced equality, rights and socio-economic considerations and commitments
through the introduction of a tenancy sustainment fund to support cases of real
hardship and the inclusion of further considerations of the impact of debt on
children and other vulnerable tenants or household members, at Section 5 of the
draft policy;
• Updated Welfare Reform and Universal Credit considerations and mitigations at
Section 12 of the draft policy;
• Updated performance monitoring commitments at Section 18 of the draft policy.  
5.2 Review Group
A Rent Recovery Review Group comprising of officers and managers from the Housing
Service has been established.  It will meet periodically over the remainder of 2025 to
review the operational procedures that support the Rent Recovery Policy in relation to
current and former tenant’s arrears, repayment agreements and progression to
enforcement and legal action while addressing the audit report findings in terms of
recording and review of communications.  The procedures aim to ensure that Housing
staff involved in the management of rent recovery and arrears meet statutory and
legislative requirements, apply good practice and strengthen consistency of approach. 
Page 37

Page 38

5.3  Draft Rent Recovery Policy Consultation
Section 54 of the Housing (Scotland) Act 2001 and the Scottish Social Housing Charter
places a legal obligation on the Council, as a social landlord, to consult with tenants and
relevant stakeholders, providing the opportunity to give their feedback.  A consultation
exercise on the revised Rent Recovery Policy will involve:
• publication of the revised Rent Recovery Policy on the Council website along
with an easy read version of the policy and summary of the changes;
• an electronic survey published via the Council’s website and social media
platforms;
• contacting relevant stakeholders for feedback, including Moray Council
tenants and former tenants, Register of Interested Tenants and Moray Tenant’s
Forum.  
5.4 Subject to Committee approval it is proposed that a six-week consultation be undertaken
from 10 September 2025 to 22 October 2025 using the Housing and Property Hub section
of the new Moray Engage portal, with consultation feedback informing the final policy
development process. 
5.5  Future Actions
Following analysis and consideration of the consultation feedback, a further report
incorporating the outcome of the consultation process and any resulting changes made to
the draft policy, will be presented to this Committee on 18 November 2025 for approval. 
5.6 Subject to Committee’s approval in November 2025, an implementation plan will be
developed to support an implementation date of 1 April 2026.  This will include, informing
tenants of any changes, arrangements for implementing the revised policy and operational
procedures, any necessary changes and / or testing to the NEC housing system to
facilitate the implementation, staff training and awareness of the revisions and a review of
all relevant tenant information resources.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal ✓ 
Financial ✓ 
Risk ✓ 
Staffing  X
Best Value and Transformation ✓ 
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact               ✓ 
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Page 38

Page 39

Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy.
☒ Building a better future for our children and young people in Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population.   
6.3  Policy and Legal 
The changes proposed are consistent with current legislation as detailed in Section 4 of
the revised policy at APPENDIX I.  The revised policy enables the Council to ensure
appropriate oversight and governance in relation to rental recovery, the progression of
legal action(s) and / or financial write-offs in an efficient and proportionate manner which
are in line with legal and regulatory requirements. 
6.4  Financial 
The Policy is an important element of the Housing Service’s ability to maximise the HRA
through rental income, which in turn supports future investment programmes. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Potential risks associated with welfare reform and universal credit housing element, along
with the relevant mitigations, are set out in Section 12 of the revised policy at APPENDIX I.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation
Page 39

Page 40

The policy ensures best value in terms of maximising rental income. 
6.8  Property 
There are none arising from this report.  
6.9  Information Communications/Technology/Digital 
There are none arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An IIA has been developed as part of the policy review and potential negative impacts
identified can be mitigated.  The IIA is attached at APPENDIX II.  
6.11  Climate Change and Biodiversity Impacts 
There are none arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Head of Housing, Property and
Communities, Chief Financial Officer, Service Manager, Legal Services, Service Manager,
Housing Operations, Service Manager, Democratic Services, the Equal Opportunities
Officer and L. Rowan, Committee Services Officer and any comments made have been
incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  Audit & Scrutiny Committee - 12 February 2025 - Final Internal Audit Review Report on
Housing Rents Collection and Arrears Management and APPENDIX I  
Housing & Community Safety Committee - 24 June 2025 - Report on the Evaluation of the
Tenancy Sustainment Fund 23/24 
Page 40

Page 41

APPENDIX I 
Rent Recovery Policy       
Current and Former Tenant Arrears 
Author Housing and Property Services – Policy Team
Date Approved  Housing and Community Safety Committee, 18 November 2025 for
implementation on 1 April 2026. 
Policy History Approved - Community Service Committee, 6 October 2004
Revisions Approved - Communities Committee, 22 October 2013
Date of next review 2029 or earlier if required by legislative or guidance changes 
Index 
1. Scope of Rent Recovery Policy
2. Strategic Context
3. Aim, principles and objectives of Rent Recovery Policy
4. Legislative framework and regulatory requirements 
5. Equalities, rights and socio-economic requirements
6. Confidentiality and data protection
7. Tenants’ Responsibilities
8. Rent Arrears Recovery
9. Prevention and early intervention
10. Signposting
11. Pre-action requirements (PARs)
12. Welfare Reform and Universal Credit
13. Enforcement action
14. Repayment agreements
15. Legal action
16. Former Tenant Arrears (Tenancy, Garages and Garage Sites)
17. Review and Complaints Process
18. Performance monitoring
19. Review of the Rent Recovery Policy 
Page 41

Page 42

APPENDIX I 
1. Scope of Rent Recovery Policy
1.1 The Rent Recovery Policy sets out the framework for how Moray Council commits
to delivering sustainable tenancies and preventing homelessness through the
effective management of rent arrears.  
1.2 The Council recognises that prevention, early intervention, support, and a
holistic, person-centred approach are key to reducing arrears and sustaining
tenancies while supporting financially vulnerable households.
1.3  The term ‘rent arrears’ applies to both rent and service charges.   For the 
purposes of this policy, the recovery of rent arrears:
• applies to property owned or managed by the Housing and Property
Service that is subject to a Scottish Secure tenancy (including short
secure tenancies);
• will be against the ‘tenant' meaning any sole and joint tenant(s) are jointly
and severally liable; and
• will cover both current and former tenant arrears.
1.4 Other leases (such as garage, garage sites and other occupancy / homeless
leases) and any associated rental debt will follow different staged rent recovery
processes as per the relevant lease.  Where attempts to recover garages, garage
sites, leases, occupancy agreements rent arrears fail, the Council will take action
to terminate the lease and legally recover the garage or garage site, with
assistance from Legal Services where necessary.
1.5   The Housing Service’s Rent Recovery Policy, supplements the Rent Setting
Policy, Temporary Accommodation Charging Policy and Housing Reserves Policy
while  supporting and complying with the Moray Council's Financial Regulations
for the proper administration of the Council's financial affairs, which includes the
Housing Revenue Account (HRA).  
1.6 In exceptional circumstances, where the debt is uneconomical to pursue,
inappropriate due to real financial hardship or there is no prospect of recovery,
the Housing Service will consider either the use of the Tenancy Sustainment Fund
to provide financial relief or for the debt to be written off in accordance with
delegated authority to the Head of Housing & Property, in consultation with the
Chief Financial Officer, and in line with the Council’s Debt Management Policy. 
2. Strategic Context 
2.1 The Rent Recovery Policy will contribute to meeting the priorities set out in the
Council’s Local Housing Strategy, Strategic Housing Investment Plan (SHIP),
HRA Business Plan and Housing Service Plan and the Council’s Housing
Reserves Policy as well as the  Corporate Plan and priorities from the Moray 10
Year Local Outcome Improvement Plan.   In particular, it will assist the Council
to achieve Best Value in the use of its resources. 
2.2   Detailed operational procedures support the Policy to ensure effective, fair and
consistent processes are involved.
Page 42

Page 43

APPENDIX I 
3.     Aim, principles and objectives of the Rent Recovery Policy
3.1  The Rent Recovery Policy aims to minimise rent loss in a sensitive but effective
manner by ensuring the following principles underpin the Council’s approach to
rent recovery:
• Legality – A Rent Recovery Policy that reflects the legal and regulatory
framework, to ensure full compliance with statutory pre-action requirements
(PARs) in attempts to minimise the use of legal action, prevent, minimise or
stabilise arrears while supporting tenants to sustain their tenancy by meeting
their legal responsibility to pay rent; 
• Consistency – The Council will apply the Rent Recovery Policy, supporting
procedures and escalation process consistently to ensure equity;
• Openness – The Council’s rent arears management and escalation process
is open, transparent and proportionate and will be supplemented by clear
and explanatory information;
• Responsiveness – the Council will ensure that staff are trained and equipped
to deal with arrears cases timely, holistically and confidently, specific to
individual circumstances; and 
• Local co-operation – the Council works cohesively with other relevant
services and /or agencies locally to provide equitable access to advice and
support for tenants and their household particularly to identify any risks and
in relation to income maximisation and welfare advice services to assist with
any financial, cost of living and /or affordability pressures. 
3.2 The specific objectives of the Rent Recovery Policy are:
• To balance minimising levels of rent arrears (including the number of tenants
in arrears) with the aim of sustaining tenancies and preventing
homelessness, while remaining sympathetic and supportive to individual
needs and circumstances, with  assisting to ensure the financial viability of
the HRA and delivery of further investment;
• To ensure, from the outset of their tenancy, that tenants are informed and
aware of their legal responsibility under their tenancy agreement to pay their
rent on time, in advance and any potential consequences of non-payment. 
This will include:
o Providing all necessary rental information prior to the start of a tenancy,
including their rental amount, the importance of making regular
payments or claiming Universal Credit (if appropriate), and methods of
payment;
o Signposting and encouraging tenants to take up the Council’s Money
Advice Service for welfare benefits and income maximisation services;
• To maintain effective two-way communication with tenants where possible
to support tenants to meet their statutory rental responsibilities; 
• To monitor rent arrear levels to help prevent rent arrears through early,
supportive intervention and PARs, ensuring appropriate tailored support and
guidance;
• To ensure all legal requirements, including PAR conditions, have been met
before taking any proportionate legal action; and
• That any proportionate legal rent recovery options, up to and including court
Page 43

Page 44

APPENDIX I 
action and / or eviction, are used as a last resort. 
4.   Legislative framework and regulatory requirements
4.1  The primary legislation governing the management of rent arrears is contained 
within:
• Part XI of the Housing (Scotland) Act 1987
• Housing (Scotland) Act 2001, S.14 and S.14A – Introduced pre-action
requirements as well as the Scottish Secure Tenancy (SST) and the Short
Scottish Secure Tenancy (SSST) agreement which creates a legally binding
contract with the tenant to pay rent.  It is the responsibility of the Council to
enforce the terms of the tenancy agreements to protect their interests. 
• Housing (Scotland) Act 2010, S.153 and S.155  introduced PARs that landlords
must satisfy in all rent arrears cases before serving a notice on a tenant
The secondary legislation the Council must follow to ensure it meets the PAR are:
• The PAR Order – Sets out PAR detail. Scottish Secure Tenancies (Proceedings
for Possession) (Pre-Action Requirements) Order 2012
• The Confirmation Regulations - Sets out the way the Council must confirm to
Court before raising repossession proceedings on rent arrear grounds, the
PARs that have been complied with. Scottish Secure Tenancies (Proceedings
for Possession) (Confirmation of Compliance with Pre-Action Requirements)
Regulations 2012
• The Notice Regulations – Created the NOP for rent arrears cases. Scottish
Secure Tenancies (Proceedings for Possession) (Form of Notice) Regulations
2012
• The Period Order – Set the maximum period a repossession order by the Court
has effect. Scottish Secure Tenancies (Repossession Orders) (Maximum
Period) Order 2012
• The Commencement Order - set 1 August 2012 as the date PARs and changes
to repossession orders came into force. Housing (Scotland) Act 2010
(Commencement No.7 and Transitional Provision) Order 2012
• Homelessness, etc. (Scotland) Act 2003 – prevention of homelessness duties 
4.2         Other relevant legislation includes:
• Adult Support and Protection Act 2007
• Children (Scotland) Act 1995 as amended 2020
• Children and Young People (Scotland) Act 2014
• Housing Benefit Regulations 2006
• Debt Arrangement and Attachment (Scotland) Act 2002
• Matrimonial Homes (Family Protection) (Scotland) Act 1981
• Civil Partnership (Scotland) Act 2020  
4.3 In line with Section 25 of the Housing (Scotland) Act 2001 and the Rent Setting
Policy, the Council will always consult with tenants regarding any change to their
rent, giving tenants 28 days’ written notice of any rent increase. 
4.4 Section 31 of the Housing (Scotland) Act 2010 introduced the Scottish Social
Housing Charter, setting rent collection and tenant support standards and
outcomes that all social landlords should aim to achieve when performing their
housing activities:   
Outcome 2 – Communication - manage their business so that tenants and other
Page 44

Page 45

APPENDIX I 
customers find it easy to communicate with their landlord and get the information
they need about their landlord, how and why it makes decisions and the services
it provides.
Outcome 11 – Tenancy Sustainment - ensure that tenants get the information they
need on how to obtain support to remain in their home and ensure suitable
support is available, including services provided by the Council directly as well as
other organisations. This includes tenants at risk of falling into rent arrears.
Outcome 13 Value for Money - manage all aspects of their business so tenants,
owners and other customers receive services that provide continually improving
value for the rent and other charges they pay. It includes managing arrears and
resources effectively, controlling costs, getting value out of contracts, giving
better value for money by increasing the quality of services with minimum extra
cost to tenants, monitoring and reviewing how landlords give value for money.  
Outcomes 14 & 15 Rents and Service Charges - reflect the Council’s legal duty to
consult tenants about rent / service charge setting to ensure:
• a balance between the level of services provided, the cost of the services, and
how far current and prospective tenants and service users can afford them;
and
• tenants get clear information on how rent and other money is spent, including
details of any individual expenditure above agreed threshold. 
5. Equalities, rights and socio-economic requirements 
5.1 Moray Council will comply with the Equality Act 2010, Human Rights Act 1998,
Fairer Scotland Duty (socio-economic inequality) and the United Nations
Convention on the Rights of the Child (UNCRC) by:
• Making reasonable adjustments for disabled tenants
• Understanding and addressing barriers faced by marginalised groups
• Assessing arrears cases through a non-discriminatory, inclusive lens
• Monitoring arrears actions to avoid disproportionate impacts on protected
groups
• Considering the impact of debt on children, care leavers, and those
experiencing domestic abuse or trauma.
5.2   The Council is committed to preventing discrimination and promoting equality of 
opportunity for every person.   In accordance with the Equality Act 2010, the
Council seeks to ensure that the Rent Recovery Policy does not discriminate
between individuals with one or more of the following protected characteristics:
age, disability, gender reassignment, marital status/civil partnership, pregnancy
and maternity, race, religion or belief and sexual orientation. 
5.3 Outcome 1 of the Scottish Social Housing Charter on Equalities ensures social
landlords perform all aspects of their housing services so that every tenant and
other customer has their individual needs recognised, is treated fairly and with
respect, and receives fair access to housing and housing services. In delivering
the Rent Recovery Policy, full consideration will be given to the Council’s Public
Sector Equality Duty (PSED).  This requires public authorities to eliminate
discrimination, harassment and victimisation, advance equality of opportunity
and to foster good relations between those who share a relevant protected
characteristic and those who do not. 
Page 45

Page 46

APPENDIX I 
5.4 The Housing Service commits to:
• communicating with tenants and service users in clear and concise plain
language to help with the understanding of important information;
• developing and providing information and advice in alternative formats where
necessary; and
• providing interpretation and translation services free of charge, where
required to assist tenant(s) with rent payments or recovery. 
6. Confidentiality and data protection
6.1 The Council will treat all tenants with courtesy, sensitivity and complete
confidence and ensure that any information given to it as part of the rent recovery
process will be used in accordance with the General Data Protection Regulations
(GDPR) and the Data Protection Act 2018.  Relevant privacy notices will advise
applicants how personal information may be collected, used, stored, shared and
securely disposed of, the legal basis for doing so and what their Data Subject
Rights are. 
7. Tenants' Responsibilities
7.1 Section 1.5 of the Scottish secure or short Scottish secure tenancy agreement 
places a legal responsibility on the tenant(s) to pay rent weekly in advance on or 
before the first day of each rental period.   Where two or more tenants have signed 
the tenancy agreement, they are jointly and severally liable for the rent payment. 
This means that each person is fully responsible for the payment of rent and any 
arrears for the duration of the tenancy.  Where a joint tenant legally ends their 
interest in the tenancy, they will no longer be held liable for any arrears accrued 
after their interest has ended. 
7.2 Details of rental amount(s) due under the legal tenancy agreement along with 
payment frequency, payment methods and the recovery process are clearly 
communicated to tenants from the outset of their housing offer to ensure they 
are fully informed of their responsibilities (as detailed further in Section 9 
below). 
7.3   Tenants have a responsibility to notify the Council of any change in their 
circumstances that may affect their ability to pay their rent.
8.   Rent Arrears Recovery
8.1 The rent recovery process is based on a preventative approach from the outset,
and seeks to maximise tenant(s)' entitlements to benefits while securing regular
payments, considering individual circumstances, vulnerabilities, any delays in
benefit payments etc. 
8.2 Supporting operational procedures for rent recovery include a full escalation
process of arrears actions at appropriate stages, up to and including
repossession for rent arrears as a last resort.  The staged approach ensures that
every rent account is regularly monitored with necessary checks made at each
relevant stage of the recovery process.  
8.3 Emphasis will be placed on regular contact by the Area Housing Officer at every
stage, particularly the early stages, to prevent any increasing arrears balances.
Page 46

Page 47

APPENDIX I 
During this contact, staff will encourage tenants in arrears to seek independent
advice and information from appropriate organisations to ensure they are
receiving all their entitlements and maximizing their income where possible.
9. Prevention and Early Intervention 
9.1  The Council will promote a positive payment culture by providing rental
information at every opportunity at property viewings / offer stage, sign-ups,
settling in visits, through the Tenants’ Handbook and Council website and
regular Tenants’ Voice newsletter articles to remind tenants of their rental
responsibilities.  Establishing a good two-way channel of open communication
between the tenant and the Area Housing Officer at this early stage is vital to
rent recovery. 
Prevention
9.2  The Council will ensure preventative measures and practices are embedded
into every new tenant offer, tenancy sign-up and settling in visit stages, with the
aim of avoiding any initial debt.  This will include a commitment to:
• ensuring that every responsible tenant is informed of all the rental costs,
payment responsibilities, frequency and methods associated with their
tenancy, along with details of rent recovery process and support that is
available should they need it, through the provision of clear concise
information in plain language from the outset of the tenancy offer, and further
reinforced at the tenancy sign-up;
• advising new tenant(s) of any eligibility they may have for welfare benefits
and / or income maximization, Universal Credit (through direct and/or
managed payments) or Housing Benefit;
• encouraging tenant(s) to set up managed payments for any UC housing cost
payments (where the housing cost is paid directly to the Council); 
• considering tenants personal and household circumstances, using a Risk
Assessment Plan (RAP) to help shape appropriate responses to help them
pay their rent, comply with legislative requirements and provide targeted
support for those impacted by UC delays, benefit sanctions, cost of living
crisis, mental health or literacy challenges;
• contacting all new tenants within six weeks of the start of their tenancy, or
earlier if there are any vulnerabilities/concerns;
• encouraging affordable and sustainable repayment plans;
• encouraging and reassuring the tenant to:
o contact the Council at the earliest opportunity should they experience a
change in their circumstances or face difficulties paying their rent; and /
or
o set up an affordable and sustainable repayment plan for any arrears.
• Providing all recovery and arrears correspondence in plain language,
including details on the availability of advice and any relevant signposting.  
Early Intervention
9.3 The Housing Services Manager will ensure early intervention through the weekly
monitoring of all rent accounts to identify any arrears figure or increase as they
arise, in an attempt to avoid any increase or become unmanageable.  Once
arrears have been identified, prompt action will be taken as follows:  
• contact tenants using a variety of methods and clear communication,
Page 47

Page 48

APPENDIX I 
detailing the current rent account balance and what action they need to take
reminding them of various payment methods along with appropriate contact
details for assistance;
• actively explore any change in circumstances, current / new issues or support
needs that may affect their ability to pay their rent and signpost accordingly if
necessary;
• where suitable, work with the tenant to encourage an affordable and
sustainable repayment plan for any rent outstanding;
• keep comprehensive records of all action taken and all contact with the
tenant(s) and household members;
• review any appropriate support assessment of their needs and
circumstances to inform the delivery of support if required; and
• check progress of agreed specific outcomes with tenants at regular intervals
to ensure rent arrears are minimised.
10. Signposting 
10.1 The Council will consider relevant signposting opportunities, where
appropriate, to help and assist the tenant(s) and / or household members
receive the required advice and support. These may include:
• Money Advice, Dept of Work and Pensions;
• Moray Citizens Advice Bureau; and / or Shelter;
• Housing Options, Homelessness and Housing Support Teams;
• Advocacy Services – Advocacy in Moray, Circles Network;
• Access Care Team – Adult Services, Children Services for vulnerability or
protection issues; and
• Any other appropriate agency. 
11.  Pre-Action Requirements (PARs)
11.1 Before seeking eviction for rent arrears under an SST/SSST, the Council will
comply with, record and document the legally required pre-action requirements
for audit purposes. These include:
• Providing clear information on arrears, tenancy terms, and rent due
• Making reasonable efforts to assist the tenant, including:
o Arranging repayment agreements
o Advising on housing benefit or Universal Credit
o Referring to money advice or support agencies
o Making reasonable efforts to agree a plan with the tenant
o Considering any welfare reform or personal circumstances impacting the
tenant
• Not initiating possession proceedings where:
o An application for Housing Benefit or Universal Credit housing cost
element has been made
o It is likely to be successful and paid directly to the Council
• Considering the best interests of children and household vulnerabilities 
11.2 A pre-action requirement checklist is embedded into the rent recovery process
to ensure and evidence that all legal requirements have been met before
progression to any form of legal action.  The Council will only consider legal
action to recover rent arrears or repossession where all previous and
Page 48

Page 49

APPENDIX I 
documented management actions have proven ineffective.
12. Welfare Reform and Universal Credit
12.1 Tenants affected by UK Government welfare restrictions, such as the Benefits
Cap (which limits the amount of housing benefit received if the total household
income from benefits reaches a specific set limit) have certain mitigations
available to them: 
Scottish Government’s Two Child Limit Payment (from 2 March 2026) - Tenants
can apply for this payment which supports low-income Scottish families by
reducing the impact and offsetting the UK Two-child Universal Credit Limit.
Under-Occupancy Charge - Tenants can apply for Direct Housing Payments
(DHP) to help cover the reduction in the amount of housing benefit they receive
for spare rooms (14% for one spare bedroom and 25% for two or more spare
bedrooms). 
12.2 It is a tenant’s responsibility to pay any shortfall that results from any changes to
their benefit entitlements, to avoid any arrears.  The Council, in pursuing the
payment of any shortfall, will:
• seek to ensure that tenants understand their ongoing responsibilities to
meet changes to their benefit entitlement;
• be mindful of the current individual circumstances; and
• not consider legal action where the tenant is waiting for a benefit
application, decision or payment which may pay or reduce the arrears. 
12.3 Where the Council is satisfied that tenants who are subject to a reduction in
benefit through any restrictions are doing all they reasonably can to avoid falling
into arrears, the Council will use all legitimate means to collect rent arrears while
profiling to identify, target and support vulnerable tenants or those at risk of
escalating arrears. 
13. Enforcement Action 
13.1 When arrears fail to stabilise or reduce and / or the tenant(s) are not engaging
with Housing staff, enforcement action will begin.  This may include initial stages
of raising legal proceedings against the tenancy.  A letter informing the tenant
that if the rent payment and any arrears payments are not made on a regular
basis, that a Notice of Proceedings for Recovery of Possession (NOP) will be
served and that legal action may be taken.
13.2 The focus will continue to focus on engagement, communication and support
with regular reminders of their legal responsibilities to pay rent and involving
household members where relevant and appropriate.
14. Repayment Agreements
14.1 Where tenant(s) cannot clear the arrears in a single payment, the Council will
discuss and agree (where possible) an affordable written re-payment agreement
to manage and reduce any arrears in realistic and sustainable instalments over
a specific period of time. The repayment agreement will be based on the
tenant(s) ability to pay and include the level of current arrears, the repayment
amount, frequency, dates and method of payment. 
Page 49

Page 50

APPENDIX I 
14.2 Repayments agreements will be monitored regularly.  Where broken, contact will
be made with the tenant to re-assess any additional circumstances and arrange
to adjust the existing agreement where appropriate or arrange a new agreement.
Where repayment agreements repeatedly break down, resulting in arrears not
reducing, the Council will have no option but to progress to further legal action
under the escalation process.  
15. Legal Action
15.1 The decision to progress with legal action will always remain the final resort in
the Council’s rent recovery process when all other engagement and attempts to
recover rent have been exhausted. Legal action may include a payment decree
(court action for the rent arrears payment) or ejection decree (court action to
recover possession of the property). In all cases, the Council will seek recovery
of expenses. Expenses may be awarded where the arrears have been repaid. 
15.2 Before serving any valid legal Notice of Proceedings (NOP) for Recovery of
Possession, the Council will make reasonable inquiries to establish, so far as is
reasonably practical, whether there are any qualifying occupiers in the house.  A
qualifying occupier is a person who occupies the house as their only or principal
home and is:
• a member of the tenant’s family aged at least 16; or
• someone to whom the tenant has, with the landlord’s consent, assigned,
sublet or otherwise given up possession of the house, or part of it; or
• someone who is a lodger and the landlord has given consent.
All qualifying occupiers will be notified of the rent arrears where it is the basis for
potential legal proceedings. 
15.3 The Council will serve the tenant and all qualifying occupiers with a NOP at least
28 days before court proceedings commence.
15.4 Tenants and qualifying occupiers will be kept informed and involved in all stages
of any legal action.  Where appropriate, the Council will ensure the tenant(s) and
any qualifying occupiers are referred or signposted to relevant support agencies
for advice or to assist with representation at court hearings.
15.5 The court may order an open decree for repayment of arrears, which the Council
can enforce for full payment of the debt, or it may order an instalment decree
which outlines a schedule for smaller, manageable repayment. 
15.6 Where a tenant has made an application for a Debt Payment Programme (DPP)
under the Debt Arrangement Scheme (DAS) the Council will continue to raise
court proceedings but will not start enforcement work for arrears payment. 
15.7 Where an eviction decree has been granted on the grounds of rent arrears, in line
with the Housing (Scotland) Act 2001 and Moray Council’s Eviction Policy and
procedure, the decree will not terminate the tenancy at the date on which it
becomes effective. The tenancy will only be terminated when the Council
recovers possession. The Scottish Secure Tenancies (Repossession Orders)
(Maximum Period) Order 2012, sets a maximum period of six months for which
an arrears eviction decree is effective. Decisions in relation to the decree will be
Page 50

Page 51

APPENDIX I 
made within the six-month period.
16.        Former Tenant Arrears (Tenancy, Garages and Garage Sites)
16.1 The Council will initiate former tenant rent arrears recovery through a similar
staged, escalation process, starting when the tenancy is terminated and the
status changes to “former tenant” with arrears debt for the tenancy just ended.  
The Council will encourage payment of the outstanding debt at the tenancy
termination stage, via an affordable and sustainable repayment agreement
where required, and will advise of the implications non-payment may have. 
Supporting operational procedures for former tenant arrears recovery ensures
that each case is regularly monitored and appropriate action taken.  Legal action
to recover the former arrears will be taken in cases where appropriate. 
16.2 Where former tenant arrears recovery has failed, or the former tenant cannot be
located, the debt will be referred to the Council’s approved Debt Collection
Agency. 
16.3 Any action for former arrears in respect of a deceased tenant will be limited to
sensitive contact with the next of kin or executor for payment from any estate.
17. Review and Complaints Process
17.1 Any tenant who disputes the amount of rent payment, arrears or repayment plan
should in the first instance contact their Area Housing Officer for an explanation. 
If the tenant is not satisfied with the explanation received, they can ask for an
appointment with their Area Housing Manager who will review the case.    
17.2 Any tenant who is not satisfied with the way Housing staff have dealt with any
aspect of their rent arrears case should contact the Housing Services Manager in
the first instance who will investigate and respond within 14 days. 
17.3 Where the tenant is still not satisfied with the way the Housing Service has dealt
with their case, the Council also has a corporate Complaints Policy.  Explanatory
information is available on the Council website. 
18. Performance Monitoring
18.1 Performance monitoring is a key factor in rent arrears management.  The
Council, as a social landlord, has a statutory duty to complete the Annual Return
on the Scottish Social Housing Charter (ARC) to the Scottish Housing Regulator
(SHR). The relevant performance indicators below provides key information on
the annual performance in relation to the amount of current and former tenant
rent collected, amount of rent arrears and the value of arrears written off:
• Indicator 26 - Rent collected as a percentage of total rent due.
• Indicator 27 – Gross rent arrears (all tenants) as at 31 March each year as
a percentage of rent due for the reporting year.
• Contextual Indicator 7 – Amount and percentage of former tenant arrears
written off at the year end.  
18.2 Performance will also be reported annually to:
• the Council’s Housing & Community Safety Committee, in line with the
Council’s Corporate Performance Management Framework (using both
Page 51

Page 52

APPENDIX I 
statutory and local performance indicators); and
• the Scottish Housing Network to allow national benchmarking against
comparator local authorities. 
18.3 The Housing Service will carry out continuous weekly and monthly monitoring of
rent accounts in terms of total current and former rent arrears per area and per
arrears band.   
19. Review of the Rent Recovery Policy
19.1 The Council will review the Rent Recovery Policy in 2029 or earlier if required by
changes to legislation or guidance.
Page 52

Page 53

APPENDIX II 
INTEGRATED IMPACT ASSESSMENT (IIA) COVERING
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended (e.g.
first draft of IIA completed and submitted to SFC
25/10/2023 for consideration; noting that further work on
Stage 2 will be required). 
Insert (ShP) Version Info (when
details have been agreed) (e.g.
5.0 03/10/2023 11:21 AMcL)
17/07/2025 1st Draft IIA to be submitted to H&CS Committee 9/9/25 
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT? 
Name of policy or proposal:                Rent Recovery Policy
Is this a  Please ✓ below
New activity, programme or policy? 
Change to an existing activity, programme or policy? ✓
Budget proposal? 
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?
Consider the impact of your proposal on people and how they access
your services and information without barriers.  
✓
Socio-economic 
Not every person/family has access to regular income or savings. Will
your proposal have an adverse impact on them  
✓
Does your proposal impact on the human rights of people?    ✓
Does your proposal impact on the rights of children and young people   ✓ 
Reasoning - Briefly describe your reasoning for the responses given above: 
Individuals within certain protected groups can be affected by more socio-economic issues in
relation to lower income / poverty issues. 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above, then proceed to
complete the Stage 2 Integrated Impact Assessment questions below.
If you have answered “no” to the Stage 1 questions above, then provide the details
below and submit to [email]
Lead Officer for developing the contract 
Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community) 
Date 
STAGE 2: INTEGRATED IMPACT ASSESSMENT
Brief description of the affected service
Page 53

Page 54

APPENDIX II 
1. Describe what the service does: 
The Housing Service’s current Rent Arrears Policy has been reviewed.  A revised draft Rent
Recovery Policy sets out the framework for how Moray Council commits to delivering
sustainable tenancies and preventing homelessness through the effective management of
rent recovery and arrears.  This includes a focus on prevention work and early intervention
mechanisms to avoid minimising any rent arrears as well as an escalation process up to and
including legal action for payment, recovery of the property (or both) as a last resort.   
2. Who are your main stakeholders? 
Moray Council current tenants and former tenants
3. What changes as a result of the proposals? Is the service reduced or removed?
The policy review proposes the following changes:
• Change of title from Rent Arrears Policy to Rent Recovery Policy to better reflect the
prevention and early intervention work that takes place prior to any accrual of  rental
arrears;
• Ensures the Council has a current policy reflective of all updated legal and regulatory
requirements while taking into consideration the current cost of living crisis;
• Enhanced equality, rights and socio-economic considerations and commitments
through the introduction of a tenancy sustainment fund to support cases of real
hardship and the inclusion of further considerations of the impact of debt on children
and other vulnerable tenants or household members;
• Updated Welfare Reform and Universal Credit considerations and mitigations;
• Updated performance monitoring commitments; and
• A review of the supporting internal operational procedures.
4. How will this affect your customers?
The aim is to provide a fairer and more consistent rent recovery process for the tenants while
receiving tailored support based on their individual circumstances.  
5. Impact on staff providing the service
Little impact.  Training/awareness on policy and procedural revisions. 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  Potential Impact - Language barriers or immigration
status may affect engagement in rent recovery process
or lack of understanding of legal implications/actions
Disability  Potential Impact - Tenants with disability, mental health
or learning difficulties may struggle to manage arrears
Carers (for elderly, disabled or
minors)
Potential Impact - Carers may struggle to get access to
the information they need to help support tenant with
rental issues i.e. no POA
Sex Potential Impact - Single women and men with children
can be at higher risk of poverty depending on their
circumstances.  Victims of domestic abuse
(male/female) may have restricted access to finance.
Pregnancy and maternity (including
breastfeeding)
Potential Impact - Maternity leave can cause financial
pressures, with potential to lead to arrears.
Sexual orientation No direct impact - Ensure LGBTQ+ tenants feel safe and
respected in arrears processes
Age (include children, young people,
midlife and older people)
Potential Impact - Older tenants or younger tenants
(especially care leavers) may face higher risk of arrears
Religion, and or belief None identified, but faith-sensitive practices should be
respected
Page 54

Page 55

APPENDIX II 
Gender reassignment Potential Impact – if communications are not inclusive 
Inequalities arising from socio-
economic differences
Potential Impact – More likely to impact on individuals
form this group due to low income.  Individuals with
disabilities tend to fall into the lower income category.
Victims of domestic abuse (male/female) may have
restricted access to finance. 
Human rights
List of convention rights Describe, where applicable, if and how specific
rights are engaged
Article 5: Right to liberty and security 
Article 6: Right to a fair trial Policy review ensures compliance with due legal
processes and requirements and any resulting  
Article 8: Right to respect for private
and family life, correspondence and
the home
Potential impact – Escalation to court action or
eviction proceedings may interfere with Article 8
rights if not handled proportionately. 
Article 10: Freedom of expression 
Article 11: Freedom of assembly and
association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights)
Policy review and IIA to identify and reduce any
impacts through relevant mitigations to support
this right.
Article 1 of Protocol 1: Protection of
property 
Article 2 of Protocol 1: Right to
education 
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination Policy review incorporates UNCRC considerations.  IIA
to identify and reduce any impacts through relevant
mitigations to support this right.
Article 3.1 – Best interest of the child Policy review incorporates UNCRC considerations.
Evictions due to arrears has the potential to impact a
child’s wellbeing and educational stability  
Article 6.2 – Right to survival and
development
Policy review incorporates UNCRC considerations.  
Article 12 – Respect of the views of the
child
Policy review incorporates UNCRC considerations.  
Article 23 – Children with a disability Policy review incorporates UNCRC considerations.   
7. Evidence. What information have you used to make your assessment?
Performance data Annual Return on the Charter (ARC) 2024/25 to Scottish Housing
Regulator (SHR)
Internal
consultation
Equal Opportunities Officer
Housing Services Manager
Area Housing Managers
Senior Housing Officer (Policy)
Page 55

Page 56

APPENDIX II 
Consultation with
affected groups
Tenant consultation to be held 10 Sept 2025 to 22 October 2025 for 6
weeks to gain feedback.  This will include:
• publication of the revised Rent Recovery Policy on the Council
website along with an easy read version of the policy and
summary of the changes;
• an electronic survey published via the Council’s website and
social media platforms;
• contacting relevant stakeholders for feedback, including Moray
Council tenants and former tenants, Register of Interested
Tenants and Moray Tenant’s Forum.
Local statistics Tenancy Sustainment Fund (TSF) was approved (12 Feb 2024 – Report
to Housing and Community Safety Committee) approved the to assist
vulnerable Council tenants who are facing financial hardship due to
the cost of living crisis.
Evaluation of the Tenancy Sustainment Fund 23/24 Report (Housing
& Community Safety Committee on 24 June 2025) provides statistics.
National statistics Scottish Housing Network Benchmarking 
Other Good practice from other Local Authorities
Scottish Rents Forum
SHN Welfare Reform Forum 
8. Evidence gaps 
Do you need additional information in order to complete the information in the
previous questions?
Feedback from tenant and stakeholder consultation will be used to further inform the IIA
before a final decision is made. 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
The above identified potential impacts can be mitigated as follows:
• Race – Moray Council provide translation/interpretation services
• Disability – Consideration of appropriate reasonable adjustments will to be
considered by staff such as accessible communication formats, etc. 
• Carers – Representative process in place within Housing service
• Sex – Signposting to Money Advice and Income Maximisation for single male/female
parents. Signposting to VAWGP or AMIS if domestic abuse.
• Pregnancy/Maternity – Signposting/referrals to support service and or Money
Advice/Income maximisation
• Age – Provide or signpost to age-appropriate advice and support
• Gender Reassignment – inclusive communications
• Socio-economic – Full pre-action requirements are considered holistically based on
individual circumstances.  Tenancy Sustainment Fund supports cases or real
financial hardship.
• Human Rights - Policy and procedure review focuses on prevention and early
intervention.  It includes full consideration and compliance with legally required pre-
action requirements, reasonable and proportionate action and robust audit trails of
engagement and actions.  This is further supported by the Council’s Eviction Policy.
• Rights of the Child (UNCRC)
Page 56

Page 57

APPENDIX II 
o The prevention and early intervention practices embedded within the policy and
procedure review may prevent homelessness or disruption of
schooling/wellbeing in affected household
o Fully embedded signposting and referrals mechanisms when household includes
children in a rent arrears case, ensuring joint working with social work or
children’s services where appropriate and avoiding eviction whenever possible 
This is also committed to in Housing’s Service Plan and Moray Council’s Equality
Outcomes for 2025-2029. 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed
policy/activity must go ahead, what justification is there to continue with the change?  
All impacts fully mitigated as per Q9 above. 
SECTION 3 CONCLUDING THE IIA
1. No potential negative impacts found for any protected groups. 
2. Some potential positive impacts have been identified.
The impacts relate to:
✓
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
✓
Promoting equality of opportunity 
Fostering good relations 
3. The proposals interfere with human rights and/or the rights of the child ✓
4. Negative impacts can be mitigated as outlined in Q9. ✓
5. The negative impacts cannot be fully mitigated but are justified as Q10. 
6. Further consultation with affected groups is needed. ✓
7. It is advised not to go ahead with the proposals. 
Decision - Set out the rationale for deciding whether or not to proceed with the
proposed actions: 
To be presented to Housing & Community Safety Committee in November 2025 for final
approval.   
Date of Decision: 
Sign off and authorisation: 
Service Housing, Property & Communities
Department Housing
Policy/activity subject to IIA Rent Recovery Policy Review
We have completed the integrated impact
assessment for this policy/activity. 
Name: Emma Armit
Position: Senior Housing Officer (Policy)
Date:  17/07/ 2025
Authorisation by head of service  Name: Edward Thomas
Position: Head of Housing, Property &
Communities
Date:
Permission to publish on website - 
Page 57

Page 58

APPENDIX II 
Page 58

Page 59

Report to: Housing And Community
Safety Committee
Meeting Date: 9 September 2025  
Report by: Executive Director for
Education, Housing and
Communities
Report No: HPS048/25  
Author: Martin Gray (Senior
Housing Officer)
Contact Email: martin.gray@moray.gov.uk 
Subject: Scottish Social Housing Charter Compliance 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of compliance with the Scottish
Social Housing Charter and the Scottish Housing Regulator’s Regulatory Framework. 
1.2  This report is submitted to Committee in terms of Section III (G) (13) of the Council's
Scheme of Administration relating to the Council’s performance management framework.   
2.  SUMMARY  
2.1  The Scottish Social Housing Charter came into force on 1 April 2012.  The aim of the
Charter is to improve the quality and value of the services provided by social landlords. 
The Charter sets out the minimum standards and outcomes that tenants can expect from
their landlord.  
2.2 Each year, social landlords must submit an Annual Return on the Charter (ARC) to the
Scottish Housing Regulator (SHR).  Using a range of performance indicators, the SHR
monitors, and assesses landlords’ performance against the Charter.  To meet regulatory
requirements, social landlords must submit an assurance statement to the SHR and
publish a performance report for tenants and service users by 31 October each year.   
3.  RECOMMENDATIONS 
3.1  It is recommended that the Housing and Community Safety Committee: 
i)  considers and approves the draft assurance statement in 
APPENDIX I; and 
ii)  notes that a summary of performance on the key Annual Return 
Item 9.
Page 59

Page 60

on the Charter (ARC) indicators against national/benchmarking 
results will be presented to the Committee on 18 November 2025.   
Martin D. Gray
Senior Housing Officer (Information) 
4.  BACKGROUND AND CONTEXT  
4.1  Annual Return on the Charter
The Scottish Housing Regulator (SHR) requires landlords to monitor progress 
against the outcomes and standards of the Scottish Social Housing Charter. 
The Council’s Annual Return on the Charter (ARC) was submitted in May 
2025.  
4.2  Assurance Statement
The SHR requires social housing landlords to submit an assurance statement 
between April and October each year.  This assures the SHR and tenants/service users
that the Housing Service complies with regulatory and statutory obligations.  Landlords
must notify the SHR of any material changes in their level of assurance during the year.  
4.3  The statement must be made by the landlord’s governing body or relevant committee and
be available to tenants and other service users.  The statement forms the basis of the
SHR’s risk assessment and level of engagement with the landlord.  The statement must: 
• confirm the landlord meets all of the relevant requirements set out in its regulatory
framework which can be found online at www.housingregulator.gov.scot/for-
landlords/regulatory-framework; 
• set out any areas of material non-compliance and describe improvement actions
and timeframes for these; 
• confirm that appropriate evidence has been considered to support the level of
assurance given by the governing body or Committee; and confirm the date of the
meeting of the governing body or Committee.  
4.4  In reaching a decision about non-compliance, the Committee must decide whether the
issue is material.  The Committee should consider whether an issue: 
• seriously affects the interests and safety of tenants or other service users; 
• threatens the stability, efficient running or viability of service delivery
arrangements; or 
• brings the landlord into disrepute or raises public or stakeholder concern about the
organisation or the social housing sector.  
4.5  On 11 March 2025, the SHR wrote to landlords to provide advice on the preparation of the
Assurance Statement, in 2025.  The SHR have requested that landlords confirm whether
they meet all duties in relation to specific areas of tenant and resident safety and that they
have obtained appropriate assurance about compliance with all relevant safety
requirements.  A draft Assurance Statement (APPENDIX I) has been prepared for the
Committee to consider and approve.  
Page 60

Page 61

4.6  The SHR will consider both the ARC results and the assurance statement as part of their
risk assessment process to decide whether they need further information or assurance. 
They will then publish an engagement plan for each social landlord by 31 March 2026. 
5.  PROPOSALS  
5.1  This report provides the Committee with an update on the Council’s compliance with the
Scottish Social Housing Charter and Regulatory Framework and asks the Committee to
consider and approve the draft assurance statement for submission to the Scottish
Housing Regulator.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✔ 
Policy and Legal ✔ 
Financial  ✔
Risk ✔ 
Staffing  ✔
Best Value and Transformation  ✔
Property  ✔
Information Communications Technology/Digital  ✔
Equalities. Social Inclusion and Economic Impact   ✔
Climate Change and Biodiversity Impact  ✔ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy.
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population.   
Page 61

Page 62

6.3  Policy and Legal 
The Council are legally required to report on Scottish Social Housing Charter performance
indicators under the Housing (Scotland) Act 2010.  
6.4  Financial 
There are no financial implications arising directly from this report.  Any costs associated
with implementing improvements will be met from within existing budgets.  
6.5  Risk 
The annual assurance statement and annual performance report are requirements under
the Scottish Housing Regulator’s Regulatory Framework.  In addition, tenants and service
users must be provided with meaningful opportunities to participate in the management
of their homes and decision-making processes.  Failure to meet these requirements
presents a regulatory risk.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications arising directly from this report.  
6.8  Property 
There are no property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no information communications/technology/digital implications arising directly
from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities implications directly arising from this report. The Housing Service
is working towards compliance on recently published guidance from the Scottish
Federation of Housing Associations relating to equalities. 
6.11  Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity impacts implications arising directly from
this report. 
7.  CONSULTATION
7.1  Consultation on this report has been carried out with the Head of Housing, Property and
Communities, Service Managers within the Housing and Property Service, G. Anderson
(Legal Services Senior Solicitor), I. Sneddon (Research and Information Officer), Customer 
Engagement Officer and L. Rowan (Committee Services Officer).  Their comments, where
relevant to their areas of responsibility, have been incorporated in this report.  
8.  BACKGROUND PAPERS  
8.1  Scottish Social Housing Charter Compliance(2023/24)
Scottish Social Housing Charter Compliance Appendix I (2023/24) 
Scottish Social Housing Charter Compliance Report (2023/24)  
Page 62

Page 63

APPENDIX I 
Moray Council Housing and 
Property Service Assurance Statement 
We comply with the regulatory requirements set out in Section 3 of the Scottish Housing
Regulator’s Regulatory Framework, apart from the areas set out below.
We achieve all but the following outcomes and standards in the Scottish Social Housing
Charter:
QUALITY OF HOUSING
The Moray Council’s annual performance presents an account of our housing service delivery,
reflecting both steady performance in key areas and challenges that are being proactively
addressed, such as Scottish Housing Quality Standard (SHQS) and Energy Efficiency Standard
for Social Housing (EESSH).
We embarked on an ambitious improvement plan in 2024, and whilst we have not currently
achieved our target of 90% compliance, we are set to achieve this within the next reporting
period. Substantial investment in improving compliance was made as part of our Improvement
Plan and real strides have been made.
SHQS Compliance
Of the 6,410 Moray Council residential properties, 2,799 fully complied (43.67%) with the
SHQS, almost doubling our compliance compared to last year (22.6%).  The main areas of non-
compliance were: 
• Electrical Safety
• Energy Efficiency 
The primary area of non-compliance relates to electrical safety, with 4,249 properties (66.29%)
currently meeting the required standard. Energy efficiency also remains a notable challenge,
with 4,468 out of 6,410 properties (69.70%) achieving compliance with the EESSH2 standard. It
is important to note that dual non-compliance, where properties fail to meet both electrical
safety and energy efficiency standards, is relatively uncommon.
Energy Efficiency 
The 2025/26 Housing Investment Plan includes £16.7M to support SHQS and EESSH
improvements. As of 31 March 2025, the Accelerated Capital Programme has delivered 245
heating upgrades (including 57 air source heat pumps), 82 solar panel installations, 203 kitchen
replacements, 204 bathrooms replacements, and over 600 insulation measures.
Damp and Mould
The Moray Council Housing and Community Safety Committee has acknowledged the increase
in dampness and mould within council housing and is actively implementing a range of
mitigation measures. These include the installation of external and internal wall insulation,
enhanced ventilation systems, and environmental monitoring devices. Remedial works are
ongoing, with future interventions prioritised for properties identified as being at higher risk.
Continuous improvements delivered through the Accelerated Capital Improvement Programme
Page 63

Page 64

aim to ensure compliance with SHQS, ultimately enhancing living conditions for tenants and
mitigate causes of damp and mould.
Tenant and Resident Safety 
Electrical Safety 
By 31 March 2025, a total of 5,623 Electrical Installation Condition Report (EICR) inspections
had been completed. Of these, 4,223 properties were found to be in (or brought to) compliance.
The remaining 1,400 inspections that identified C2 faults, have been scheduled for remedial
work.  All C1 faults (classified as the most critical) were addressed immediately, and no
identified unresolved C1 issues remain.
Landlord Gas Safety
A property acquired to support homelessness prevention was found to lack a valid gas safety
certificate at the time of purchase. A full inspection confirmed the property’s compliance
shortly after, but due to incomplete documentation, we have recorded it as a failure. We’ve
since strengthened our procedures to ensure this does not happen again.
Fire and Carbon Monoxide Detection
As of 31 March 2025, all our properties meet the updated Fire Safety Regulations.  Over the past
year, we completed the final phase of fire detection system upgrades. This was achieved
through strong teamwork between housing, asset and DLO staff, which helped us reach
residents who were harder to contact. In a few cases, formal forced entry procedures were
followed to ensure the work could be carried out safely and in line with regulations. 
All homes that required them are fitted with carbon monoxide (CO) detectors and comply with
the Housing (Scotland) Act 1987 (Tolerable Standard) (Extension of Criteria) Amendment Order
2021.
Lift Safety 
We only have one sheltered housing complex with a lift which is included on a cyclical
maintenance contract to ensure that it complies with relevant legislation.
Asbestos 
We maintain a comprehensive and up-to-date asbestos register and ensure that a full risk
assessment is conducted prior to the commencement of any work within our properties.
Significant progress has been made in phasing out the use of cloned asbestos surveys, with
full, property-specific surveys now available across our housing stock.
As part of our ongoing commitment to health and safety compliance, we have begun the
implementation of a dedicated asbestos module within the NEC Housing System. This system
once fully implemented will provide staff with secure electronic access to detailed information
on Asbestos Containing Materials (ACMs) within each property, supporting informed decision-
making and safe working practices.
Water Safety
We routinely conduct legionella risk assessments on our vacant properties, actively working to
reduce risks by removing dead legs in the plumbing systems. The exception to this practice, as
previously stated, is with newly installed mandatory wet sprinkler systems. The risk of legionella
has been assessed as low and the benefits of these systems outweigh the potential risk.
Page 64

Page 65

Health and Safety Executive Reportable Events
Unfortunately, there was a single notifiable event reported to the Health and Safety Executive
(HSE) under the Reporting of Injuries, Diseases, and Dangerous Occurrences Regulations
(RIDDOR).  A member of staff sustained an injury.
Housing and Homelessness
The total number of homeless households to whom the local authority has a statutory duty to
secure permanent accommodation decreased from last year, with a reduction of 12.2%.
Unsuitable Accommodation Order
During 2024/25 there were 34 households breaching the Unsuitable Accommodations Order. 
This was a direct result of two periods where supply was insufficient to meet demand and
resulted in extended stays in Bed and Breakfast accommodation.  This was further exacerbated
by the lack of new supply of council housing.
Temporary Accommodation Standards Framework
The service is broadly compliant with the new guidance and framework, with the exception of
digital inclusion. Currently, our temporary accommodation units are not equipped with free
internet access. Nevertheless, tenants are supported through free access to internet services
provided at Moray Council information hubs, libraries, and the main reception, helping to
reduce barriers to digital connectivity.
Equality and Human Rights
We are continuing to work towards aligning with the equalities guidance published by the
Scottish Federation of Housing Associations (SFHA) in 2023. While some system changes have
not yet been fully implemented due to differing definitions of certain protected
characteristics—which may impact the Scottish Government’s homelessness data
collection—we remain committed to progress. The Government has advised that a review of
these definitions is not expected before 2025.
Integrated Impact Assessments are carried out as part of the development process for all new
policies and strategies. This structured approach helps us to assess potential impacts, monitor
relevant protected characteristics, and ensure our work supports positive outcomes. It also
helps us to minimise any unintended effects and maintain alignment with our Local Outcome
Improvement Plan, Corporate Plan, and associated Equality Outcomes.
Gypsy/Travellers 
Moray Council does not currently operate any official gypsy/traveller sites. However, we have
established a local protocol for managing unauthorised encampments, which ensures that the
needs of both the encampment residents and the broader community are met. This protocol is
supported by our dedicated unauthorised encampments officer, who oversees the process and
provides necessary assistance and support.
We approved our Assurance Statement on 9 September 2025 and sign this statement on behalf
of the Housing and Community Safety Committee. 
Councillor Amber Dunbar   Councillor Paul McBain
Chair of Housing and Community Safety Depute Chair of Housing and Community Safety
Page 65

Page 66

Page 66

Page 67

Report to: Housing and
Community Safety
Committee
Meeting
Date: 
9 September 2025  
Report by: Executive Director for
Education, Housing
and Communities 
Report No: HPS008/25  
Author: Ivor McIvor, Private
Sector Housing
Manager
Contact
Email:
privatehousinggrants@moray.gov.uk 
Subject: Moray Home Energy Efficiency Programme 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to note progress on the Moray Home Energy Efficiency
Programme and to agree future actions.  
1.2  This report is submitted to Committee in terms of Section III (G) (2) of the Council’s
Scheme of Administration relating to the exercise of all the functions of the Council as a
housing authority.   
2.  SUMMARY  
2.1  The report provides the outturn of the Home Energy Efficiency Programme over the last
financial year, i.e. 2024/25, and seeks approval for approaches going forward.   
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee:   
i)  scrutinises and notes the progress made on the delivery of the Moray Home
Energy Efficiency Programme; and 
ii)  agrees the approaches to delivery of the programme detailed in Section 5.   
Ivor McIvor
Private Sector Housing Manager
Item 10.
Page 67

Page 68

4. BACKGROUND AND CONTEXT  
4.1 The Energy Efficient Scotland programme (EES:ABS formerly known as HEEPS:ABS) is a
Scottish Government initiative to tackle fuel poverty by improving the energy efficiency of
existing private sector homes.  The programme offers grant-in-kind with a focus on
alleviating fuel poverty.  The cost of the measures to households is discounted by a
combination of Scottish Government grant and Energy Company Obligation (ECO) funding
provided by utility companies.  Only private sector households are eligible for HEEPS
funding but ECO is available to all tenures, including council housing.  
4.2 Since 2013/14, the Scottish Government has provided the Council with an annual funding
allocation for the EES:ABS for energy efficiency and carbon reduction measures to homes
in Moray.  Details of the last 5 years allocations are provided below: 
2020/21 £2.128m
2021/22 £1.914m
2022/23 £1.842m
2023/24 £2.137m (including special project)
2024/25 £1.769m  
4.3 This Committee is provided with an update on the EES ABS programme annually, most
recently on 10 September 2024 (Para 10 of the Minute refers).  
4.4 During 2013/14 to 2024/25, the Moray programme has delivered measures to over 1,000
properties as shown in the table below.  With the exception of 2021/22 (COVID19) and
2024/25, the Moray EES ABS programme has generally spent all or almost all, of its budget
allocation. 
Year Private sector properties in receipt of
completed measures
2013/14 275
2014/15 151
2015/16 135
2016/17 128
2017/18 96
2018/19 196
2019/20 70
2020/21 100
2021/22 0
2022/23 254
2023/24 358
2024/25 49
Total 1,812 
5. MORAY EES:ABS PROGRAMME 2023/24 OUTTURN  
5.1 The Scottish Government’s EES ABS guidance required councils to apply a “fabric first”
approach with measures to be targeted to fuel poor households, specifically those living in
Council Tax bands A-C properties.  Properties may be suitable for more than one measure.
Page 68

Page 69

5.2 Changeworks have been acting as managing agent to deliver the HEEPS ABS programme
since 2021.  This service is funded from within the Scottish Government grant allocation. 
The agent is required to provide an end-to-end service from identifying and engaging with
targeted householders; procurement of contractors; to quality assurance, monitoring,
evaluation and reporting.  The agent will provide the resource and expertise required to
deliver a multi-measure programme involving specialist contractors and provide specialist
advice and support to householders.  Although the managing agent takes on the majority
of the workload, some Housing and Accountancy resource is required to run the scheme
effectively and maintain appropriate governance.  
5.3 The outturn for 2024/25 is presented in the table below: 
Measure 2024/25
Solar PV/battery storage 4
Loft insulation 3
Internal wall insulation 22
Cavity insulation extraction and refill 17
Air source heat pump 8
Room in Roof insulation 0
Underfloor insulation 0
Total 54
* Properties may receive more than one measure  
5.4 It is notable that outturn is considerably reduced from previous years, bolstered only by
over commitment from the previous year and that only 60% of 2024/25 grant funding has
been spent.  This is the first time for many years that outturn has been substantially less
than 100% (COVID19 excepted).  This is despite strenuous efforts on the part of
Changeworks as managing agent who have responsibility for marketing, and their sub-
contractors. The late release of funding by Scottish Government also hampered take up of
measures.  
6. SCARF – ECO4 FUNDED WORKS  
6.1 Home Energy Scotland (HES) provide advice and support on energy supplier switching,
energy saving and fuel debt advice, access to emergency/hardship grants, as well as
signposting to provision of insulation measures, on a tenure-neutral basis. SCARF
administer the HES function in northeast Scotland.  
6.2 In early 2024, SCARF offered Moray Council the opportunity to join its recently established
Energy Company Obligation (ECO) referral scheme.  On 1 May 2024, Moray Council joined
the scheme which will provide private sector owners and renters with access to ECO
funded insulation and carbon reduction measures.  Moray joined other members who are
Aberdeen City, Aberdeenshire and Angus Councils.  SCARF will source an energy company
willing to provide the ECO funding and will procure contractors from their established
framework.  This scheme is provided at no cost to Moray Council.  Full details are
published on the Council’s website at
http://www.moray.gov.uk/moray_standard/page_154848.html. 
Page 69

Page 70

6.3 The ECO4 scheme has proven to be very popular with fuel poor households.  Since its
establishment 221 referrals with a total of 254 measures carried out to 83 properties. 
Measure* Completed
Solar PV/battery storage 72
Loft insulation 28
Internal wall insulation 18
Cavity insulation extraction and refill 8
Air source heat pump 66
Room in Roof insulation 9
Underfloor insulation 6
Other 47
Total 254
* Properties may receive more than one measure  
6.4 The ECO 4 programme has also displaced 412 tonnes of CO2 with an estimated bill saving
of £145,000.  
6.5 To date properties have received works with an average value of £19,215.49, which is far in
excess of the grant funding available via EES:ABS, and with a range of measures which is
far broader than those offered via EES:ABS (see para 6.3 above).  
6.6 There has been positive feedback for the EES:ABS project and a recent case study was
presented to Scottish Government. The ECO 4 programme was also well received with
90% of customers being very satisfied with the outcome and would recommend the
scheme to others.  
7. FUTURE APPROACH 2025/26  
7.1 Moray Council were allocated funding, in principle, of £1,769,485 on 11 June 2025 for the
2025/2026 Area Based Scheme. 
7.2 Changeworks have supported officers in the presentation of the funding bid application,
which was successful, with confirmation being received from Scottish Government on 3
July 2025.  
7.3 As the contract with Changeworks, our managing agent, has expired we are now in the
process of procuring a new agent, to be in place by September, to assist with the delivery
of this year’s programme.  
7.4 Officers recommend that Moray Council should continue to signpost potentially fuel poor
households to the ECO4 scheme delivered by SCARF, in their role as agent for Scottish
Government Home Energy Scotland.  Officers believe that this scheme provides good
value to fuel poor households, does not require qualifying households to make a financial
contribution, and requires only minimal officer input.  
7.5 Committee should expect an update on the outcome of the funding bid and procurement
of a new managing agent in November 2025. 
Page 70

Page 71

8. SUMMARY OF IMPLICATIONS  
8.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact  X 
Climate Change and Biodiversity Impact X 
8.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following local
Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy.
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☒ Improving wellbeing of our population. 
8.3  Policy and Legal 
Part 4 of the Climate Change (Scotland) Act 2009 places duties on public bodies relating
to climate change.  Moray Council has declared a Climate Change Emergency.  Delivery of
the EES:ABS and ECO4 programme will contribute to the achievements of these aims and
requirements.  
8.4  Financial 
The report provides details of progress in delivering energy efficiency measures to housing
stock in Moray, funded from external sources, mainly the Scottish Government’s Energy
Efficient Scotland Area Based Scheme (EES:ABS), and Energy Company Obligation (ECO)
funding.  No Moray Council funding is required to deliver the schemes detailed within this
report. 
Page 71

Page 72

One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With Effect
From
Annual Net
Impact
Virement
From (if
applicable)
Other
Comments       
8.5  Risk 
There are no risk implications arising from this report.  
8.6  Staffing 
The administration of the EES:ABS scheme requires staffing resource initially from
Housing and Procurement teams and from Housing on an ongoing basis.  The ECO4
scheme requires minimal Housing staffing resource and no Procurement resources.  
8.7  Best Value and Transformation 
No implications.  
8.8  Property 
No implications.  
8.9  Information Communications/Technology/Digital 
No implications.  
8.10  Equalities, Social Inclusion and Economic Impact 
The energy efficiency proposals set out in this report will be targeted to the homes of fuel
poor households.  
8.11  Climate Change and Biodiversity Impacts 
The aims of the energy efficiency programme are closely aligned to the aims of the Local
Housing Strategy, the Council’s Climate Change Strategy, and Local Heat and Energy
Efficiency Strategy (LHEES). 
9. CONSULTATION  
9.1 This report has been prepared in consultation with the Head of Housing, Property and
Communities, the Chief Finance Officer, the Service Manager, Housing Strategy, the
Housing Asset Manager, G. Anderson (Legal Services Senior Solicitor), the Principal
Climate Change Strategy Officer and L. Rowan (Committee Services Officer) and any
comments made have been incorporated into the report.   
10. BACKGROUND PAPERS  
10.1 Held by Ivor McIvor, Private Sector Housing Manager.
Page 72

Page 73

Moray Affordable Housing Investment Programme
Moray Affordable Housing Investment Programme Appendix I 
Page 73

Page 74

Page 74